diff --git a/docs/ajax-data.json b/docs/ajax-data.json index df66c940..ed5543bd 100644 --- a/docs/ajax-data.json +++ b/docs/ajax-data.json @@ -1 +1 @@ -{"project_length": {"tesla_str": "(83)", "all_str": "(1248)"}} \ No newline at end of file +{"project_length": {"tesla_str": "(84)", "all_str": "(1249)"}} \ No newline at end of file diff --git a/docs/all-big-batteries.html b/docs/all-big-batteries.html index 0f3df8f6..ad398eb0 100644 --- a/docs/all-big-batteries.html +++ b/docs/all-big-batteries.html @@ -29,7 +29,7 @@ - Big battery Tracker (1248) + Big battery Tracker (1249) @@ -100,13 +100,13 @@

Big battery tracker

Projects count 330 186 - 732 + 733 πŸ”‹ Battery capacity (GWh) 42.8 42.6 - 129.0 + 129.2 @@ -10931,6 +10931,36 @@

Big battery list

+ + + + Glenbrook + Glenbrook + + + + πŸ‡³πŸ‡Ώ + new zealand + + + + 200 + 100 + planning + 0 ~ 2026Q1 + + tesla + Contact Energy + + + + 1397 + + πŸ‘€ + + + @@ -37716,7 +37746,7 @@

Contact & Contribute

This page is not affiliated, associated, endorsed by or in any way officially connected with Tesla, Inc.
- Website was generated on: 2024-07-15 15:01 UTC + Website was generated on: 2024-07-15 15:24 UTC
@@ -37765,7 +37795,7 @@

Contact & Contribute

// var projects = ''; // projects = JSON.parse(projects) // could also have the json as static file and load it here... - var projects = [{"csv": {"name": "Sendai", "city": "sendai", "id": "1374", "external_id": "", "state": "miyagi", "country": "japan", "capacity_mwh": "43", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Kenes", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "14", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.271948", "long": "140.833529", "coords_hint": "3", "use_case": "", "notes": "guessed the mw, assuming it is a 4h system", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1802738958679285856", "link2": "", "link3": "", "link4": ""}, "internal_id": "1374", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 11, "mwh_is_estimate": false, "mwh": 43, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "month_disappeared": "", "go_live": "2024-06", "go_live_year_int": 2024, "name": "Sendai", "name_short": "Sendai", "owner": "Kenes", "state": "miyagi", "country": "japan", "lat": "38.271948", "long": "140.833529", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.271948+140.833529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 14, "notes_split": ["guessed the mw, assuming it is a 4h system"], "links": ["https://x.com/Tesla_Megapack/status/1802738958679285856"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Azure Sky Wind Project, LLC Hybrid", "city": "", "id": "242", "external_id": "64164", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "120", "customer": "", "owner": "Azure Sky Wind Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "242", "external_id": "64164", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Azure Sky Wind Project, LLC Hybrid", "external_id": "64164", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 240, "power_mw": 120, "owner": "Azure Sky Wind Project, LLC", "status": "operation", "date_first_heard": "2020-12", "start_construction": "", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ASWBE": {"first": {"year": "2022", "month": "3", "entity id": "63784", "entity name": "Azure Sky Wind Project, LLC", "plant producer type": "IPP", "plant name": "Azure Sky Wind Project, LLC Hybrid", "plant state": "TX", "plant id": "64164", "generator id": "ASWBE", "net summer capacity (mw)": "120", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64164", "date": "2022-03", "mw": 120}, "first_month": "2020-12", "changes": [{"month": "2022-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-09", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-05", "to": "2024-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "4", "entity id": "63784", "entity name": "Azure Sky Wind Project, LLC", "plant producer type": "IPP", "plant name": "Azure Sky Wind Project, LLC Hybrid", "plant state": "TX", "plant id": "64164", "generator id": "ASWBE", "net summer capacity (mw)": "120", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64164", "date": "2024-04", "mw": 120}, "current_month": "2024-06", "dates": {"first_heard": "2020-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 120, "mwh_is_estimate": true, "mwh": 240, "mwh_estimate": 240, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-12", "start_construction": "", "start_operation": "2024-04", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Azure Sky Wind Project, LLC Hybrid", "name_short": "Azure Sky Wind Project", "owner": "Azure Sky Wind Project, LLC", "state": "texas", "country": "usa", "lat": "33.526939371284264", "long": "-95.1731198926975", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.526939371284264+-95.1731198926975", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ranchland Wind Storage", "city": "", "id": "250", "external_id": "64545", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "146", "power_mw": "73", "customer": "", "owner": "Ranchland Wind Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "250", "external_id": "64545", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ranchland Wind Storage", "external_id": "64545", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 146, "power_mw": 73, "owner": "Ranchland Wind Storage, LLC", "status": "operation", "date_first_heard": "2021-05", "start_construction": "2021-12", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "3", "entity id": "64179", "entity name": "Ranchland Wind Storage, LLC", "plant producer type": "IPP", "plant name": "Ranchland Wind Storage", "plant state": "TX", "plant id": "64545", "generator id": "BA", "net summer capacity (mw)": "73", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64545", "date": "2022-03", "mw": 73}, "first_month": "2021-05", "changes": [{"month": "2021-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-05", "to": "2022-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2023-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-05", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-05", "to": "2024-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "4", "entity id": "64179", "entity name": "Ranchland Wind Storage, LLC", "plant producer type": "IPP", "plant name": "Ranchland Wind Storage", "plant state": "TX", "plant id": "64545", "generator id": "BA", "net summer capacity (mw)": "73", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64545", "date": "2024-04", "mw": 73}, "current_month": "2024-06", "dates": {"first_heard": "2021-05", "start_construction": "2021-12"}, "month_disappeared": ""}}, "mw": 73, "mwh_is_estimate": true, "mwh": 146, "mwh_estimate": 146, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-05", "start_construction": "2021-12", "start_operation": "2024-04", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Ranchland Wind Storage", "name_short": "Ranchland Wind", "owner": "Ranchland Wind Storage, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.373438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.373438", "construction_time_month": 28, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Zier Solar", "city": "", "id": "863", "external_id": "66137", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Cypress Creek Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "863", "external_id": "66137", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Zier Solar", "external_id": "66137", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Cypress Creek Renewables", "status": "operation", "date_first_heard": "2023-01", "start_construction": "", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"11023": {"first": {"year": "2024", "month": "2", "entity id": "61060", "entity name": "Cypress Creek Renewables", "plant producer type": "IPP", "plant name": "Zier Solar", "plant state": "TX", "plant id": "66137", "generator id": "11023", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66137", "date": "2024-02", "mw": 40}, "first_month": "2023-01", "changes": [{"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "4", "entity id": "61060", "entity name": "Cypress Creek Renewables", "plant producer type": "IPP", "plant name": "Zier Solar", "plant state": "TX", "plant id": "66137", "generator id": "11023", "net summer capacity (mw)": "40.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66137", "date": "2024-04", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-01", "start_construction": "", "start_operation": "2024-04", "start_estimated": "2024-02", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Zier Solar", "name_short": "Zier Solar", "owner": "Cypress Creek Renewables", "state": "texas", "country": "usa", "lat": "33.60453116095374", "long": "-95.1641099430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.60453116095374+-95.1641099430736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sunlight Storage II", "city": "", "id": "948", "external_id": "66575", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Sunlight Storage II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "948", "external_id": "66575", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sunlight Storage II", "external_id": "66575", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 460, "power_mw": 230, "owner": "Sunlight Storage II", "status": "operation", "date_first_heard": "2023-05", "start_construction": "2023-09", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SUNS2": {"first": {"year": "2024", "month": "4", "entity id": "65625", "entity name": "Sunlight Storage II", "plant producer type": "IPP", "plant name": "Sunlight Storage II", "plant state": "CA", "plant id": "66575", "generator id": "SUNS2", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66575", "date": "2024-04", "mw": 230}, "first_month": "2023-05", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "4", "entity id": "65625", "entity name": "Sunlight Storage II", "plant producer type": "IPP", "plant name": "Sunlight Storage II", "plant state": "CA", "plant id": "66575", "generator id": "SUNS2", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66575", "date": "2024-04", "mw": 230}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 230, "mwh_is_estimate": true, "mwh": 460, "mwh_estimate": 460, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-05", "start_construction": "2023-09", "start_operation": "2024-04", "start_estimated": "2024-04", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Sunlight Storage II", "name_short": "Sunlight Storage II", "owner": "Sunlight Storage II", "state": "california", "country": "usa", "lat": "41.273150024586876", "long": "-121.50715735055999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.273150024586876+-121.50715735055999", "construction_time_month": 7, "construction_speed_mwh_per_month": 65, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Proxima", "city": "", "id": "952", "external_id": "66270", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "324", "power_mw": "162", "customer": "", "owner": "Proxima Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "952", "external_id": "66270", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Proxima", "external_id": "66270", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 324, "power_mw": 162, "owner": "Proxima Solar, LLC", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-06", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PRXBS": {"first": {"year": "2023", "month": "9", "entity id": "65394", "entity name": "Proxima Solar, LLC", "plant producer type": "IPP", "plant name": "Proxima", "plant state": "CA", "plant id": "66270", "generator id": "PRXBS", "net summer capacity (mw)": "162", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66270", "date": "2023-09", "mw": 162}, "first_month": "2023-03", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-10", "to": "2024-01", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "4", "entity id": "65394", "entity name": "Proxima Solar, LLC", "plant producer type": "IPP", "plant name": "Proxima", "plant state": "CA", "plant id": "66270", "generator id": "PRXBS", "net summer capacity (mw)": "162", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66270", "date": "2024-04", "mw": 162}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-06"}, "month_disappeared": ""}}, "mw": 162, "mwh_is_estimate": true, "mwh": 324, "mwh_estimate": 324, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-06", "start_operation": "2024-04", "start_estimated": "2023-10", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Proxima", "name_short": "Proxima", "owner": "Proxima Solar, LLC", "state": "california", "country": "usa", "lat": "41.03803592366989", "long": "-121.41654744719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.03803592366989+-121.41654744719", "construction_time_month": 10, "construction_speed_mwh_per_month": 32, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sky Ranch Solar and Storage", "city": "", "id": "1047", "external_id": "66814", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Sky Ranch Solar and Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1047", "external_id": "66814", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sky Ranch Solar", "external_id": "66814", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Sky Ranch Solar and Storage", "status": "operation", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SKYBA": {"first": {"year": "2024", "month": "3", "entity id": "65781", "entity name": "Sky Ranch Solar and Storage", "plant producer type": "IPP", "plant name": "Sky Ranch Solar and Storage", "plant state": "NM", "plant id": "66814", "generator id": "SKYBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66814", "date": "2024-03", "mw": 50}, "first_month": "2023-08", "changes": [{"month": "2024-05", "li": [{"name": "plant name", "from": "Sky Ranch Solar and Storage", "to": "Sky Ranch Solar", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "4", "entity id": "65781", "entity name": "Sky Ranch Solar and Storage", "plant producer type": "IPP", "plant name": "Sky Ranch Solar", "plant state": "NM", "plant id": "66814", "generator id": "SKYBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66814", "date": "2024-04", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2024-04", "start_estimated": "2024-03", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Sky Ranch Solar", "name_short": "Sky Ranch Solar", "owner": "Sky Ranch Solar and Storage", "state": "new mexico", "country": "usa", "lat": "36.63917097668374", "long": "-103.81552074903644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.63917097668374+-103.81552074903644", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clay Tye", "city": "Upminster", "id": "76", "external_id": "", "state": "essex", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures (FRV)", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552193", "long": "0.297889", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "link2": "https://x.com/Tesla_Megapack/status/1775254497973202985", "link3": "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/", "link4": ""}, "internal_id": "76", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 99, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Clay Tye", "name_short": "Clay Tye", "owner": "", "state": "essex", "country": "uk", "lat": "51.552193", "long": "0.297889", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.552193+0.297889", "construction_time_month": 30, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "https://x.com/Tesla_Megapack/status/1775254497973202985", "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Gemini", "city": "Las Vegas", "id": "105", "external_id": "63352", "state": "nevada", "country": "usa", "capacity_mwh": "1400", "estimate_mwh": "", "power_mw": "380", "customer": "", "owner": "Primergy Solar (Quinbrook)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-13", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "cost_million": "1000", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.474167", "long": "-114.784706", "coords_hint": "1", "use_case": "690MW solar farm support", "notes": "from the planning docs, it seems battery containers will be split out across the solar farm, that is why the location was set to exact", "project_website": "https://www.primergysolar.com/portfolio", "link1": "https://www.energy-storage.news/us-dept-of-interior-approves-690mw-nevada-solar-plant-with-1400mwh-energy-storage-component/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/100498/570", "link3": "", "link4": ""}, "internal_id": "105", "external_id": "63352", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gemini Solar", "external_id": "63352", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 760, "power_mw": 380, "owner": "Gemini Solar", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARPV1": {"first": {"year": "2023", "month": "11", "entity id": "63117", "entity name": "Gemini Solar", "plant producer type": "IPP", "plant name": "Gemini Solar", "plant state": "NV", "plant id": "63352", "generator id": "ARPV1", "net summer capacity (mw)": "280", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63352", "date": "2023-11", "mw": 280}, "first_month": "2020-09", "changes": [{"month": "2023-01", "li": [{"name": "mw", "from": 280, "to": 380, "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "63117", "entity name": "Gemini Solar", "plant producer type": "IPP", "plant name": "Gemini Solar", "plant state": "NV", "plant id": "63352", "generator id": "ARPV1", "net summer capacity (mw)": "380", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63352", "date": "2024-03", "mw": 380}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 380, "mwh_is_estimate": false, "mwh": 1400, "mwh_estimate": 760, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2024-03", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Gemini Solar", "name_short": "Gemini Solar", "owner": "Gemini Solar", "state": "nevada", "country": "usa", "lat": "36.474167", "long": "-114.784706", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.474167+-114.784706", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["from the planning docs, it seems battery containers will be split out across the solar farm, that is why the location was set to exact"], "links": ["https://www.energy-storage.news/us-dept-of-interior-approves-690mw-nevada-solar-plant-with-1400mwh-energy-storage-component/", "https://eplanning.blm.gov/eplanning-ui/project/100498/570"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jamesfield Farm", "city": "Abernethy", "id": "130", "external_id": "10863", "state": "fife", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "Tag Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "26", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://www.harmonyenergyplanning.co.uk/jamesfield/", "link3": "", "link4": ""}, "internal_id": "130", "external_id": "10863", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Jamesfield Organic Centre - Battery Storage", "external_id": "10863", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "construction", "date_first_heard": "2022-09-28", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10863", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7315 & 10456", "Address": "140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/00832/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "planning", "mw": 49, "ext_id": "10863"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2022", "to": "12/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2025", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "28/09/2025", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2023", "to": "24/03/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10863", "Record Last Updated (dd/mm/yyyy)": "24/03/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7315 & 10456", "Address": "140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/00832/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "construction", "mw": 49, "ext_id": "10863"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-07", "start_construction": "2023-01-12", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09-28", "start_construction": "2023-01-01", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Jamesfield Organic Centre - Battery Storage", "name_short": "Jamesfield Organic Centre", "owner": "Harmony Energy Storage", "state": "scotland", "country": "uk", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.347678+-3.298351", "construction_time_month": 14, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 26, "notes_split": ["extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article"], "links": ["https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "https://www.harmonyenergyplanning.co.uk/jamesfield/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "AES West Oahu Solar Hybrid", "city": "", "id": "219", "external_id": "64656", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "12.5", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "219", "external_id": "64656", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES West Oahu Solar Hybrid", "external_id": "64656", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2022-09", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UHBES": {"first": {"year": "2022", "month": "9", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES West Oahu Solar Hybrid", "plant state": "HI", "plant id": "64656", "generator id": "UHBES", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64656", "date": "2022-09", "mw": 12}, "first_month": "2021-06", "changes": [{"month": "2022-06", "li": [{"name": "date", "from": "2022-09", "to": "2023-01", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2023-01", "to": "2023-06", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2024-01", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES West Oahu Solar Hybrid", "plant state": "HI", "plant id": "64656", "generator id": "UHBES", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64656", "date": "2024-03", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2022-09", "start_operation": "2024-03", "start_estimated": "2022-09", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "AES West Oahu Solar Hybrid", "name_short": "AES West Oahu Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.54447929522626", "long": "-155.30620467944766", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.54447929522626+-155.30620467944766", "construction_time_month": 18, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cameron Wind 1 LLC", "city": "", "id": "563", "external_id": "59118", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "24", "customer": "", "owner": "Cameron Wind 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "563", "external_id": "59118", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cameron Wind 1 LLC", "external_id": "59118", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 32, "power_mw": 16, "owner": "Cameron Wind 1 LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "2023-05", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SABAL": {"first": {"year": "2022", "month": "10", "entity id": "58939", "entity name": "Cameron Wind 1 LLC", "plant producer type": "IPP", "plant name": "Cameron Wind 1 LLC", "plant state": "TX", "plant id": "59118", "generator id": "SABAL", "net summer capacity (mw)": "24", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "59118", "date": "2022-10", "mw": 24}, "first_month": "2021-11", "changes": [{"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2023-06", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}, {"name": "mw", "from": 24, "to": 16, "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "58939", "entity name": "Cameron Wind 1 LLC", "plant producer type": "IPP", "plant name": "Cameron Wind 1 LLC", "plant state": "TX", "plant id": "59118", "generator id": "SABAL", "net summer capacity (mw)": "16.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59118", "date": "2024-03", "mw": 16}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 16, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "2023-05", "start_operation": "2024-03", "start_estimated": "2022-10", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Cameron Wind 1 LLC", "name_short": "Cameron Wind 1", "owner": "Cameron Wind 1 LLC", "state": "texas", "country": "usa", "lat": "33.60453116095374", "long": "-95.1641099430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.60453116095374+-95.1641099430736", "construction_time_month": 10, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kogan Creek / Chinchilla", "city": "", "id": "691", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "CS Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "80", "status": "operation", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "cost_million": "150", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-26.917756", "long": "150.746113", "coords_hint": "2", "use_case": "", "notes": "used day of tweet as operation start date", "project_website": "", "link1": "https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "link2": "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "link3": "https://twitter.com/SawyerMerritt/status/1764791615061668146", "link4": ""}, "internal_id": "691", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Kogan Creek / Chinchilla", "name_short": "Kogan Creek / Chinchilla", "owner": "", "state": "queensland", "country": "australia", "lat": "-26.917756", "long": "150.746113", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-26.917756+150.746113", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 80, "notes_split": ["used day of tweet as operation start date"], "links": ["https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "https://twitter.com/SawyerMerritt/status/1764791615061668146"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Arica Solar", "city": "", "id": "699", "external_id": "65744", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "272", "power_mw": "136", "customer": "", "owner": "Arica Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "699", "external_id": "65744", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arica Solar", "external_id": "65744", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 272, "power_mw": 136, "owner": "Arica Solar, LLC", "status": "operation", "date_first_heard": "2022-08", "start_construction": "2022-10", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARCBA": {"first": {"year": "2022", "month": "12", "entity id": "64996", "entity name": "Arica Solar, LLC", "plant producer type": "IPP", "plant name": "Arica Solar", "plant state": "CA", "plant id": "65744", "generator id": "ARCBA", "net summer capacity (mw)": "136", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65744", "date": "2022-12", "mw": 136}, "first_month": "2022-08", "changes": [{"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2023-11", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "64996", "entity name": "Arica Solar, LLC", "plant producer type": "IPP", "plant name": "Arica Solar", "plant state": "CA", "plant id": "65744", "generator id": "ARCBA", "net summer capacity (mw)": "136", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65744", "date": "2024-03", "mw": 136}, "current_month": "2024-06", "dates": {"first_heard": "2022-08", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 136, "mwh_is_estimate": true, "mwh": 272, "mwh_estimate": 272, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "2022-10", "start_operation": "2024-03", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Arica Solar", "name_short": "Arica Solar", "owner": "Arica Solar, LLC", "state": "california", "country": "usa", "lat": "41.005868576126275", "long": "-120.94054963684043", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.005868576126275+-120.94054963684043", "construction_time_month": 17, "construction_speed_mwh_per_month": 16, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Victory Pass", "city": "", "id": "709", "external_id": "65743", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Victory Pass I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "709", "external_id": "65743", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Victory Pass", "external_id": "65743", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Victory Pass I, LLC", "status": "operation", "date_first_heard": "2022-08", "start_construction": "2022-10", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"VCTBA": {"first": {"year": "2022", "month": "11", "entity id": "64995", "entity name": "Victory Pass I, LLC", "plant producer type": "IPP", "plant name": "Victory Pass", "plant state": "CA", "plant id": "65743", "generator id": "VCTBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65743", "date": "2022-11", "mw": 50}, "first_month": "2022-08", "changes": [{"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-11", "to": "2023-11", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "64995", "entity name": "Victory Pass I, LLC", "plant producer type": "IPP", "plant name": "Victory Pass", "plant state": "CA", "plant id": "65743", "generator id": "VCTBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65743", "date": "2024-03", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2022-08", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "2022-10", "start_operation": "2024-03", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Victory Pass", "name_short": "Victory Pass", "owner": "Victory Pass I, LLC", "state": "california", "country": "usa", "lat": "41.183862364886245", "long": "-121.48835819022644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.183862364886245+-121.48835819022644", "construction_time_month": 17, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clairemont Energy Storage", "city": "", "id": "935", "external_id": "66266", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "935", "external_id": "66266", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Clairemont Energy Storage", "external_id": "66266", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-02", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "8", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Clairemont Energy Storage", "plant state": "CA", "plant id": "66266", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66266", "date": "2023-08", "mw": 10}, "first_month": "2023-02", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Clairemont Energy Storage", "plant state": "CA", "plant id": "66266", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66266", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Clairemont Energy Storage", "name_short": "Clairemont", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "40.952677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.952677+-121.300049", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Paradise Energy Storage", "city": "", "id": "936", "external_id": "66265", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "936", "external_id": "66265", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Paradise Energy Storage", "external_id": "66265", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-02", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "8", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Paradise Energy Storage", "plant state": "CA", "plant id": "66265", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66265", "date": "2023-08", "mw": 10}, "first_month": "2023-02", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Paradise Energy Storage", "plant state": "CA", "plant id": "66265", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66265", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Paradise Energy Storage", "name_short": "Paradise", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "40.94007414887133", "long": "-121.24071773708002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94007414887133+-121.24071773708002", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Melrose BESS", "city": "", "id": "961", "external_id": "66281", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "961", "external_id": "66281", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Melrose BESS", "external_id": "66281", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Melrose BESS", "plant state": "CA", "plant id": "66281", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66281", "date": "2023-07", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Melrose BESS", "plant state": "CA", "plant id": "66281", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66281", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}, "2": {"first": {"year": "2023", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Melrose BESS", "plant state": "CA", "plant id": "66281", "generator id": "2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66281", "date": "2023-07", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Melrose BESS", "plant state": "CA", "plant id": "66281", "generator id": "2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66281", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Melrose BESS", "name_short": "Melrose", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.16655741320125", "long": "-121.16499897468609", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.16655741320125+-121.16499897468609", "construction_time_month": 11, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pala Gomez Creek BESS", "city": "", "id": "962", "external_id": "66280", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "962", "external_id": "66280", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pala Gomez Creek BESS", "external_id": "66280", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Pala Gomez Creek BESS", "plant state": "CA", "plant id": "66280", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66280", "date": "2023-07", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Pala Gomez Creek BESS", "plant state": "CA", "plant id": "66280", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66280", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Pala Gomez Creek BESS", "name_short": "Pala Gomez Creek", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.21907378137597", "long": "-121.1673702129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.21907378137597+-121.1673702129225", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Boulevard Energy Storage", "city": "", "id": "963", "external_id": "66279", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "963", "external_id": "66279", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Boulevard Energy Storage", "external_id": "66279", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "8", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Boulevard Energy Storage", "plant state": "CA", "plant id": "66279", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66279", "date": "2023-08", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Boulevard Energy Storage", "plant state": "CA", "plant id": "66279", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66279", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Boulevard Energy Storage", "name_short": "Boulevard", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.273154160953744", "long": "-121.1907209430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.273154160953744+-121.1907209430736", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elliott Energy Storage", "city": "", "id": "964", "external_id": "66278", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "964", "external_id": "66278", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elliott Energy Storage", "external_id": "66278", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "8", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Elliott Energy Storage", "plant state": "CA", "plant id": "66278", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66278", "date": "2023-08", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Elliott Energy Storage", "plant state": "CA", "plant id": "66278", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66278", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Elliott Energy Storage", "name_short": "Elliott", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.32049675538939", "long": "-121.23577346517001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.32049675538939+-121.23577346517001", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "St. Gall Energy Storage I", "city": "", "id": "992", "external_id": "66336", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "St. Gall Energy Storage I", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "992", "external_id": "66336", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "St. Gall Energy Storage I", "external_id": "66336", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "St. Gall Energy Storage I", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SGES1": {"first": {"year": "2023", "month": "12", "entity id": "65426", "entity name": "St. Gall Energy Storage I", "plant producer type": "IPP", "plant name": "St. Gall Energy Storage I", "plant state": "TX", "plant id": "66336", "generator id": "SGES1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66336", "date": "2023-12", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-04", "to": "2024-03", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "3", "entity id": "65426", "entity name": "St. Gall Energy Storage I", "plant producer type": "IPP", "plant name": "St. Gall Energy Storage I", "plant state": "TX", "plant id": "66336", "generator id": "SGES1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66336", "date": "2024-03", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "2024-03", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "St. Gall Energy Storage I", "name_short": "St. Gall Energy Storage I", "owner": "St. Gall Energy Storage I", "state": "texas", "country": "usa", "lat": "33.322390103486484", "long": "-95.45465780673999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.322390103486484+-95.45465780673999", "construction_time_month": 5, "construction_speed_mwh_per_month": 40, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Golden Field Solar III, LLC", "city": "", "id": "1178", "external_id": "63859", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "294", "power_mw": "147", "customer": "", "owner": "Golden Field Solar III, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1178", "external_id": "63859", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Golden Field Solar III, LLC", "external_id": "63859", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 294, "power_mw": 147, "owner": "Golden Field Solar III, LLC", "status": "operation", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RCBA": {"first": {"year": "2024", "month": "4", "entity id": "63545", "entity name": "Golden Field Solar III, LLC", "plant producer type": "IPP", "plant name": "Golden Field Solar III, LLC", "plant state": "CA", "plant id": "63859", "generator id": "RCBA", "net summer capacity (mw)": "147", "technology": "Batteries", "energy source code": "", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63859", "date": "2024-04", "mw": 147}, "first_month": "2024-01", "changes": [{"month": "2024-02", "li": [{"name": "energy source code", "from": "", "to": "MWH", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-04", "to": "2024-03", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "3", "entity id": "63545", "entity name": "Golden Field Solar III, LLC", "plant producer type": "IPP", "plant name": "Golden Field Solar III, LLC", "plant state": "CA", "plant id": "63859", "generator id": "RCBA", "net summer capacity (mw)": "147", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63859", "date": "2024-03", "mw": 147}, "current_month": "2024-06", "dates": {"first_heard": "2024-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 147, "mwh_is_estimate": true, "mwh": 294, "mwh_estimate": 294, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "2024-03", "start_estimated": "2024-04", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Golden Field Solar III, LLC", "name_short": "Golden Field Solar III", "owner": "Golden Field Solar III, LLC", "state": "california", "country": "usa", "lat": "40.93693686027558", "long": "-121.04439962977752", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.93693686027558+-121.04439962977752", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ganado Solar", "city": "", "id": "1368", "external_id": "67284", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Enel Green Power NA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-03-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1368", "external_id": "67284", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ganado Solar", "external_id": "67284", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Enel Green Power NA, Inc.", "status": "operation", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GBA": {"first": {"year": "2024", "month": "3", "entity id": "59380", "entity name": "Enel Green Power NA, Inc.", "plant producer type": "IPP", "plant name": "Ganado Solar", "plant state": "TX", "plant id": "67284", "generator id": "GBA", "net summer capacity (mw)": "70.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67284", "date": "2024-03", "mw": 70}, "first_month": "2024-03", "changes": [{"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "59380", "entity name": "Enel Green Power NA, Inc.", "plant producer type": "IPP", "plant name": "Ganado Solar", "plant state": "TX", "plant id": "67284", "generator id": "GBA", "net summer capacity (mw)": "70.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "67284", "date": "2024-03", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Ganado Solar", "name_short": "Ganado Solar", "owner": "Enel Green Power NA, Inc.", "state": "texas", "country": "usa", "lat": "33.62803843467857", "long": "-95.51290703033499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.62803843467857+-95.51290703033499", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "EReserve 1-9 (9 different locations)", "city": "", "id": "13", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "315", "estimate_mwh": "", "power_mw": "180", "customer": "WCSB Power", "owner": "Enfinite", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "55.740245", "long": "-118.700003", "coords_hint": "1", "use_case": "", "notes": "eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ** the mwh number is from the twitter post", "project_website": "https://ereserve-project.com/", "link1": "http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "link2": "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "link3": "https://x.com/Tesla_Megapack/status/1781467958218469840", "link4": "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"}, "internal_id": "13", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 180, "mwh_is_estimate": false, "mwh": 315, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "month_disappeared": "", "go_live": "2024-02", "go_live_year_int": 2024, "name": "EReserve 1-9 (9 different locations)", "name_short": "EReserve 1-9 (9 different locations...", "owner": "Enfinite", "state": "alberta", "country": "canada", "lat": "55.740245", "long": "-118.700003", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.740245+-118.700003", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ", " the mwh number is from the twitter post"], "links": ["http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "https://x.com/Tesla_Megapack/status/1781467958218469840", "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Justin Court Energy Storage", "city": "", "id": "1046", "external_id": "66758", "state": "new jersey", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI 23 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1046", "external_id": "66758", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Justin Court Energy Storage", "external_id": "66758", "state": "new jersey", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "VESI 23 LLC", "status": "operation", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2024-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"JC1": {"first": {"year": "2023", "month": "7", "entity id": "65755", "entity name": "VESI 23 LLC", "plant producer type": "IPP", "plant name": "Justin Court Energy Storage", "plant state": "NJ", "plant id": "66758", "generator id": "JC1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66758", "date": "2023-07", "mw": 20}, "first_month": "2023-08", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2024-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "2", "entity id": "65755", "entity name": "VESI 23 LLC", "plant producer type": "IPP", "plant name": "Justin Court Energy Storage", "plant state": "NJ", "plant id": "66758", "generator id": "JC1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66758", "date": "2024-02", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2024-02", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2024-02", "go_live_year_int": 2024, "name": "Justin Court Energy Storage", "name_short": "Justin Court", "owner": "VESI 23 LLC", "state": "new jersey", "country": "usa", "lat": "40.11302298145458", "long": "-74.37304960280748", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.11302298145458+-74.37304960280748", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Goleta Energy Storage Project", "city": "Goleta", "id": "34", "external_id": "66394", "state": "california", "country": "usa", "capacity_mwh": "160", "estimate_mwh": "", "power_mw": "60", "customer": "Goleta Energy Storage, LLC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "62", "status": "operation", "date_first_heard": "2019-11-13", "start_construction": "", "start_operation": "2023-12-05", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.43274", "long": "-119.869283", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "the planning document on the website has a lot of detail", "project_website": "https://www.cityofgoleta.org/city-hall/planning-and-environmental-review/ceqa-review/cortona-battery-storage-project", "link1": "https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2", "link2": "", "link3": "", "link4": ""}, "internal_id": "34", "external_id": "66394", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Goleta Energy Storage, LLC", "external_id": "66394", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Goleta Energy Storage, LLC", "status": "operation", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GOLET": {"first": {"year": "2023", "month": "4", "entity id": "65479", "entity name": "Goleta Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Goleta Energy Storage, LLC", "plant state": "CA", "plant id": "66394", "generator id": "GOLET", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66394", "date": "2023-04", "mw": 60}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-04", "to": "2023-10", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "1", "entity id": "65479", "entity name": "Goleta Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Goleta Energy Storage, LLC", "plant state": "CA", "plant id": "66394", "generator id": "GOLET", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66394", "date": "2024-01", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": false, "mwh": 160, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Goleta Energy Storage, LLC", "name_short": "Goleta Energy Storage", "owner": "Goleta Energy Storage, LLC", "state": "california", "country": "usa", "lat": "34.43274", "long": "-119.869283", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.43274+-119.869283", "construction_time_month": 6, "construction_speed_mwh_per_month": 26, "no_of_battery_units": 62, "notes_split": ["the planning document on the website has a lot of detail"], "links": ["https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Richborough Energy Park", "city": "", "id": "450", "external_id": "8195", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Richborough Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "450", "external_id": "8195", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Richborough Energy Park", "external_id": "8195", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Richborough Energy Park Limited", "status": "operation", "date_first_heard": "2021-02-09", "start_construction": "2023-03-01", "start_operation": "2024-01-11", "start_estimated": "", "month_disappeared": "", "lat": "51.311959", "long": "1.343", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8195", "Record Last Updated (dd/mm/yyyy)": "24/02/2021", "Operator (or Applicant)": "Richborough Energy Park Limited", "Site Name": "Richborough Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Richborough Energy Park", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633075", "Y-coordinate": "162290", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/20/1467", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.311959", "long": "1.343", "status": "planning", "mw": 49, "ext_id": "8195"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2021", "to": "07/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "09/02/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/12/2021", "to": "19/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/03/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2023", "to": "11/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "8195", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Richborough Energy Park Limited", "Site Name": "Richborough Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Richborough Energy Park", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633075", "Y-coordinate": "162290", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/20/1467", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/02/2024", "Under Construction": "01/03/2023", "Operational": "", "Heat Network Ref": "", "lat": "51.311959", "long": "1.343", "status": "operation", "mw": 49, "ext_id": "8195"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-24", "start_construction": "2023-04-19", "start_operation": "2024-01-11"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02-09", "start_construction": "2023-03-01", "start_operation": "2024-01-11", "start_estimated": "", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Richborough Energy Park", "name_short": "Richborough Energy Park", "owner": "Richborough Energy Park Limited", "state": "south east", "country": "uk", "lat": "51.311959", "long": "1.343", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.311959+1.343", "construction_time_month": 10, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Richborough Energy Park - Phase 2", "city": "", "id": "516", "external_id": "9626", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "71", "power_mw": "71", "customer": "", "owner": "Richborough Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "516", "external_id": "9626", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Richborough Energy Park - Phase 2", "external_id": "9626", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Richborough Energy Park Limited", "status": "operation", "date_first_heard": "2021-04-30", "start_construction": "2023-01-01", "start_operation": "2024-01-11", "start_estimated": "", "month_disappeared": "", "lat": "51.311959", "long": "1.343", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9626", "Record Last Updated (dd/mm/yyyy)": "16/09/2021", "Operator (or Applicant)": "Richborough Energy Park Limited", "Site Name": "Richborough Energy Park - Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "71.60", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Richborough Energy Park", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633075", "Y-coordinate": "162290", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/21/0305", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.311959", "long": "1.343", "status": "planning", "mw": 71, "ext_id": "9626"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "30/04/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/09/2021", "to": "10/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2023", "to": "11/01/2024", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "71.6", "to": "50.1", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "mw", "from": 71, "to": 50, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9626", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Richborough Energy Park Limited", "Site Name": "Richborough Energy Park - Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.1", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Richborough Energy Park", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633075", "Y-coordinate": "162290", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/21/0305", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/04/2024", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "51.311959", "long": "1.343", "status": "operation", "mw": 50, "ext_id": "9626"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-16", "start_construction": "2023-01-10", "start_operation": "2024-01-11"}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04-30", "start_construction": "2023-01-01", "start_operation": "2024-01-11", "start_estimated": "", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Richborough Energy Park - Phase 2", "name_short": "Richborough Energy Park - Phase 2", "owner": "Richborough Energy Park Limited", "state": "south east", "country": "uk", "lat": "51.311959", "long": "1.343", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.311959+1.343", "construction_time_month": 12, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mesquite Solar 4, LLC", "city": "", "id": "773", "external_id": "65962", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "773", "external_id": "65962", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mesquite Solar 4, LLC", "external_id": "65962", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Consolidated Edison Development Inc.", "status": "operation", "date_first_heard": "2022-10", "start_construction": "2022-11", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MS4B": {"first": {"year": "2023", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Mesquite Solar 4, LLC", "plant state": "AZ", "plant id": "65962", "generator id": "MS4B", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65962", "date": "2023-06", "mw": 10}, "first_month": "2022-10", "changes": [{"month": "2022-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-01", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "1", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Mesquite Solar 4, LLC", "plant state": "AZ", "plant id": "65962", "generator id": "MS4B", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65962", "date": "2024-01", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2022-10", "start_construction": "2022-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-10", "start_construction": "2022-11", "start_operation": "2024-01", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Mesquite Solar 4, LLC", "name_short": "Mesquite Solar 4", "owner": "Consolidated Edison Development Inc.", "state": "arizona", "country": "usa", "lat": "36.31177149915876", "long": "-110.00633776197225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.31177149915876+-110.00633776197225", "construction_time_month": 14, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "House Mountain", "city": "", "id": "859", "external_id": "66006", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "63", "customer": "", "owner": "House Mountain", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "859", "external_id": "66006", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "House Mountain", "external_id": "66006", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 126, "power_mw": 63, "owner": "House Mountain", "status": "operation", "date_first_heard": "2022-11", "start_construction": "2023-02", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2023", "month": "4", "entity id": "65181", "entity name": "House Mountain", "plant producer type": "IPP", "plant name": "House Mountain", "plant state": "TX", "plant id": "66006", "generator id": "BA", "net summer capacity (mw)": "63", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66006", "date": "2023-04", "mw": 63}, "first_month": "2022-11", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-05", "to": "2023-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-07", "to": "2023-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "1", "entity id": "65181", "entity name": "House Mountain", "plant producer type": "IPP", "plant name": "House Mountain", "plant state": "TX", "plant id": "66006", "generator id": "BA", "net summer capacity (mw)": "63", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66006", "date": "2024-01", "mw": 63}, "current_month": "2024-06", "dates": {"first_heard": "2022-11", "start_construction": "2023-02"}, "month_disappeared": ""}}, "mw": 63, "mwh_is_estimate": true, "mwh": 126, "mwh_estimate": 126, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "2023-02", "start_operation": "2024-01", "start_estimated": "2023-04", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "House Mountain", "name_short": "House Mountain", "owner": "House Mountain", "state": "texas", "country": "usa", "lat": "33.361966935676264", "long": "-94.99002315814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.361966935676264+-94.99002315814404", "construction_time_month": 11, "construction_speed_mwh_per_month": 11, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kapolei Energy Storage", "city": "", "id": "1", "external_id": "66067", "state": "hawaii", "country": "usa", "capacity_mwh": "565", "estimate_mwh": "", "power_mw": "185", "customer": "Hawaiian Electric", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "158", "status": "operation", "date_first_heard": "", "start_construction": "2021-08-25", "start_operation": "2024-01-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.328169", "long": "-158.105085", "coords_hint": "1", "use_case": "island, black start", "notes": "", "project_website": "https://www.kapoleienergystorage.com/overview", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "link2": "https://twitter.com/Tesla_Megapack/status/1745499330612748482", "link3": "", "link4": ""}, "internal_id": "1", "external_id": "66067", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kapolei Energy Storage", "external_id": "66067", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "Kapolei Energy Storage I, LLC", "status": "operation", "date_first_heard": "2023-01", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KES1": {"first": {"year": "2023", "month": "5", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Kapolei Energy Storage", "plant state": "HI", "plant id": "66067", "generator id": "KES1", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66067", "date": "2023-05", "mw": 185}, "first_month": "2023-01", "changes": [{"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Kapolei Energy Storage", "plant state": "HI", "plant id": "66067", "generator id": "KES1", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66067", "date": "2023-12", "mw": 185}, "current_month": "2024-02", "dates": {"first_heard": "2023-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": false, "mwh": 565, "mwh_estimate": 370, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-01", "start_construction": "2021-08-25", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Kapolei Energy Storage", "name_short": "Kapolei", "owner": "Kapolei Energy Storage I, LLC", "state": "hawaii", "country": "usa", "lat": "21.328169", "long": "-158.105085", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:21.328169+-158.105085", "construction_time_month": 28, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 158, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "https://twitter.com/Tesla_Megapack/status/1745499330612748482"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Daggett 2", "city": "", "id": "167", "external_id": "64851", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "262", "power_mw": "131", "customer": "", "owner": "Daggett Solar Power 2 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "167", "external_id": "64851", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Daggett 2", "external_id": "64851", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 262, "power_mw": 131, "owner": "Daggett Solar Power 2 LLC", "status": "operation", "date_first_heard": "2021-09", "start_construction": "2023-01", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DAGGB": {"first": {"year": "2023", "month": "6", "entity id": "64364", "entity name": "Daggett Solar Power 2 LLC", "plant producer type": "IPP", "plant name": "Daggett 2", "plant state": "CA", "plant id": "64851", "generator id": "DAGGB", "net summer capacity (mw)": "131", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64851", "date": "2023-06", "mw": 131}, "first_month": "2021-09", "changes": [{"month": "2022-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-11", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-11", "to": "2023-09", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "64364", "entity name": "Daggett Solar Power 2 LLC", "plant producer type": "IPP", "plant name": "Daggett 2", "plant state": "CA", "plant id": "64851", "generator id": "DAGGB", "net summer capacity (mw)": "131", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64851", "date": "2023-12", "mw": 131}, "current_month": "2024-02", "dates": {"first_heard": "2021-09", "start_construction": "2023-01"}, "month_disappeared": ""}}, "mw": 131, "mwh_is_estimate": true, "mwh": 262, "mwh_estimate": 262, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "2023-01", "start_operation": "2023-12", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Daggett 2", "name_short": "Daggett 2", "owner": "Daggett Solar Power 2 LLC", "state": "california", "country": "usa", "lat": "41.34434765645874", "long": "-121.46110215912815", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.34434765645874+-121.46110215912815", "construction_time_month": 11, "construction_speed_mwh_per_month": 23, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arrow Canyon Solar Hybrid", "city": "", "id": "229", "external_id": "62248", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Arrow Canyon Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "229", "external_id": "62248", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arrow Canyon Solar Hybrid", "external_id": "62248", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Arrow Canyon Solar LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-12", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"2": {"first": {"year": "2022", "month": "12", "entity id": "61768", "entity name": "Arrow Canyon Solar LLC", "plant producer type": "IPP", "plant name": "Arrow Canyon Solar Hybrid", "plant state": "NV", "plant id": "62248", "generator id": "2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62248", "date": "2022-12", "mw": 75}, "first_month": "2020-09", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2022-12", "to": "2023-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "61768", "entity name": "Arrow Canyon Solar LLC", "plant producer type": "IPP", "plant name": "Arrow Canyon Solar Hybrid", "plant state": "NV", "plant id": "62248", "generator id": "2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62248", "date": "2023-12", "mw": 75}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-12"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-12", "start_operation": "2023-12", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Arrow Canyon Solar Hybrid", "name_short": "Arrow Canyon Solar", "owner": "Arrow Canyon Solar LLC", "state": "nevada", "country": "usa", "lat": "41.616942044661236", "long": "-115.13235745087825", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.616942044661236+-115.13235745087825", "construction_time_month": 12, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Revolution", "city": "", "id": "939", "external_id": "66170", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Crane 2 BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "939", "external_id": "66170", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Revolution", "external_id": "66170", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Crane 2 BESS, LLC", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "10", "entity id": "65313", "entity name": "Crane 2 BESS, LLC", "plant producer type": "IPP", "plant name": "Revolution", "plant state": "TX", "plant id": "66170", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66170", "date": "2023-10", "mw": 150}, "first_month": "2023-02", "changes": [{"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65313", "entity name": "Crane 2 BESS, LLC", "plant producer type": "IPP", "plant name": "Revolution", "plant state": "TX", "plant id": "66170", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66170", "date": "2023-12", "mw": 150}, "current_month": "2024-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2023-12", "start_estimated": "2023-10", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Revolution", "name_short": "Revolution", "owner": "Crane 2 BESS, LLC", "state": "texas", "country": "usa", "lat": "33.374327615451264", "long": "-95.02806541879585", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.374327615451264+-95.02806541879585", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Solar Blue", "city": "", "id": "949", "external_id": "63848", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "450", "power_mw": "225", "customer": "", "owner": "Westlands Solar Blue (OZ) Owner, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "949", "external_id": "63848", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Solar Blue", "external_id": "63848", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 450, "power_mw": 225, "owner": "Westlands Solar Blue (OZ) Owner, LLC", "status": "operation", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2023", "month": "9", "entity id": "63525", "entity name": "Westlands Solar Blue (OZ) Owner, LLC", "plant producer type": "IPP", "plant name": "Solar Blue", "plant state": "CA", "plant id": "63848", "generator id": "BESS1", "net summer capacity (mw)": "225", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63848", "date": "2023-09", "mw": 225}, "first_month": "2023-03", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "63525", "entity name": "Westlands Solar Blue (OZ) Owner, LLC", "plant producer type": "IPP", "plant name": "Solar Blue", "plant state": "CA", "plant id": "63848", "generator id": "BESS1", "net summer capacity (mw)": "225", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63848", "date": "2023-12", "mw": 225}, "current_month": "2024-02", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 225, "mwh_is_estimate": true, "mwh": 450, "mwh_estimate": 450, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-12", "start_estimated": "2023-09", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Solar Blue", "name_short": "Solar Blue", "owner": "Westlands Solar Blue (OZ) Owner, LLC", "state": "california", "country": "usa", "lat": "41.20858372443624", "long": "-121.56444271153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.20858372443624+-121.56444271153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chestnut", "city": "", "id": "953", "external_id": "63849", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "Chestnut Westside, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "953", "external_id": "63849", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Chestnut", "external_id": "63849", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 270, "power_mw": 135, "owner": "Chestnut Westside, LLC", "status": "operation", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2023", "month": "9", "entity id": "63526", "entity name": "Chestnut Westside, LLC", "plant producer type": "IPP", "plant name": "Chestnut", "plant state": "CA", "plant id": "63849", "generator id": "BESS1", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63849", "date": "2023-09", "mw": 135}, "first_month": "2023-03", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "63526", "entity name": "Chestnut Westside, LLC", "plant producer type": "IPP", "plant name": "Chestnut", "plant state": "CA", "plant id": "63849", "generator id": "BESS1", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63849", "date": "2023-12", "mw": 135}, "current_month": "2024-02", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 135, "mwh_is_estimate": true, "mwh": 270, "mwh_estimate": 270, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-12", "start_estimated": "2023-09", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Chestnut", "name_short": "Chestnut", "owner": "Chestnut Westside, LLC", "state": "california", "country": "usa", "lat": "40.98838017893376", "long": "-121.39762135188055", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98838017893376+-121.39762135188055", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McFarland A Solar and Storage", "city": "", "id": "1009", "external_id": "66636", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1009", "external_id": "66636", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McFarland A Solar and Storage", "external_id": "66636", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "AES Clean Energy", "status": "operation", "date_first_heard": "2023-06", "start_construction": "2023-09", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland A Solar and Storage", "plant state": "AZ", "plant id": "66636", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66636", "date": "2023-12", "mw": 100}, "first_month": "2023-06", "changes": [{"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2023-11", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland A Solar and Storage", "plant state": "AZ", "plant id": "66636", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66636", "date": "2023-12", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2023-06", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-06", "start_construction": "2023-09", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "McFarland A Solar and Storage", "name_short": "McFarland A Solar", "owner": "AES Clean Energy", "state": "arizona", "country": "usa", "lat": "36.53961436488624", "long": "-110.07356319022644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.53961436488624+-110.07356319022644", "construction_time_month": 3, "construction_speed_mwh_per_month": 66, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SR McNeal", "city": "", "id": "1035", "external_id": "66925", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "SR McNeal, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1035", "external_id": "66925", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SR McNeal", "external_id": "66925", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "SR McNeal, LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MCBA": {"first": {"year": "2023", "month": "12", "entity id": "65303", "entity name": "SR McNeal, LLC", "plant producer type": "IPP", "plant name": "SR McNeal", "plant state": "AZ", "plant id": "66925", "generator id": "MCBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66925", "date": "2023-12", "mw": 20}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65303", "entity name": "SR McNeal, LLC", "plant producer type": "IPP", "plant name": "SR McNeal", "plant state": "AZ", "plant id": "66925", "generator id": "MCBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66925", "date": "2023-12", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SR McNeal", "name_short": "SR McNeal", "owner": "SR McNeal, LLC", "state": "arizona", "country": "usa", "lat": "36.308429", "long": "-109.885254", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.308429+-109.885254", "construction_time_month": 1, "construction_speed_mwh_per_month": 40, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Estrella Solar & Storage", "city": "", "id": "1039", "external_id": "66772", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "56", "power_mw": "28", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1039", "external_id": "66772", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Estrella Solar & Storage", "external_id": "66772", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 56, "power_mw": 28, "owner": "AES Clean Energy", "status": "operation", "date_first_heard": "2023-08", "start_construction": "2023-10", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ESTRB": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Estrella Solar & Storage", "plant state": "CA", "plant id": "66772", "generator id": "ESTRB", "net summer capacity (mw)": "28", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66772", "date": "2023-12", "mw": 28}, "first_month": "2023-08", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Estrella Solar & Storage", "plant state": "CA", "plant id": "66772", "generator id": "ESTRB", "net summer capacity (mw)": "28", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66772", "date": "2023-12", "mw": 28}, "current_month": "2024-02", "dates": {"first_heard": "2023-08", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 28, "mwh_is_estimate": true, "mwh": 56, "mwh_estimate": 56, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-08", "start_construction": "2023-10", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Estrella Solar & Storage", "name_short": "Estrella Solar &", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "41.04295061545127", "long": "-121.05467641879585", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.04295061545127+-121.05467641879585", "construction_time_month": 2, "construction_speed_mwh_per_month": 28, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Reid Gardner", "city": "", "id": "1048", "external_id": "2324", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "440", "power_mw": "220", "customer": "", "owner": "Nevada Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1048", "external_id": "2324", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Reid Gardner", "external_id": "2324", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 440, "power_mw": 220, "owner": "Nevada Power Co", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RGES1": {"first": {"year": "2023", "month": "12", "entity id": "13407", "entity name": "Nevada Power Co", "plant producer type": "Electric Utility", "plant name": "Reid Gardner", "plant state": "NV", "plant id": "2324", "generator id": "RGES1", "net summer capacity (mw)": "220", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "2324", "date": "2023-12", "mw": 220}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "13407", "entity name": "Nevada Power Co", "plant producer type": "Electric Utility", "plant name": "Reid Gardner", "plant state": "NV", "plant id": "2324", "generator id": "RGES1", "net summer capacity (mw)": "220", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "2324", "date": "2023-12", "mw": 220}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 220, "mwh_is_estimate": true, "mwh": 440, "mwh_estimate": 440, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Reid Gardner", "name_short": "Reid Gardner", "owner": "Nevada Power Co", "state": "nevada", "country": "usa", "lat": "41.693869024586874", "long": "-115.11311435056", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.693869024586874+-115.11311435056", "construction_time_month": 1, "construction_speed_mwh_per_month": 440, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Alamo LLC", "city": "", "id": "1067", "external_id": "66929", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Alamo LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1067", "external_id": "66929", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Alamo LLC", "external_id": "66929", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Alamo LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTAL": {"first": {"year": "2023", "month": "11", "entity id": "65843", "entity name": "SMT Alamo LLC", "plant producer type": "IPP", "plant name": "SMT Alamo LLC", "plant state": "TX", "plant id": "66929", "generator id": "SMTAL", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66929", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65843", "entity name": "SMT Alamo LLC", "plant producer type": "IPP", "plant name": "SMT Alamo LLC", "plant state": "TX", "plant id": "66929", "generator id": "SMTAL", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66929", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Alamo LLC", "name_short": "SMT Alamo", "owner": "SMT Alamo LLC", "state": "texas", "country": "usa", "lat": "33.67572465645873", "long": "-95.43449115912814", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.67572465645873+-95.43449115912814", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Harlingen II LLC", "city": "", "id": "1068", "external_id": "66933", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Harlingen II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1068", "external_id": "66933", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Harlingen II LLC", "external_id": "66933", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Harlingen II LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTH2": {"first": {"year": "2023", "month": "11", "entity id": "65847", "entity name": "SMT Harlingen II LLC", "plant producer type": "IPP", "plant name": "SMT Harlingen II LLC", "plant state": "TX", "plant id": "66933", "generator id": "SMTH2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66933", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65847", "entity name": "SMT Harlingen II LLC", "plant producer type": "IPP", "plant name": "SMT Harlingen II LLC", "plant state": "TX", "plant id": "66933", "generator id": "SMTH2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66933", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Harlingen II LLC", "name_short": "SMT Harlingen II", "owner": "SMT Harlingen II LLC", "state": "texas", "country": "usa", "lat": "33.62803843467857", "long": "-95.51290703033499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.62803843467857+-95.51290703033499", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Mercedes LLC", "city": "", "id": "1069", "external_id": "66926", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Mercedes LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1069", "external_id": "66926", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Mercedes LLC", "external_id": "66926", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Mercedes LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTNM": {"first": {"year": "2023", "month": "11", "entity id": "65838", "entity name": "SMT Mercedes LLC", "plant producer type": "IPP", "plant name": "SMT Mercedes LLC", "plant state": "TX", "plant id": "66926", "generator id": "SMTNM", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66926", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65838", "entity name": "SMT Mercedes LLC", "plant producer type": "IPP", "plant name": "SMT Mercedes LLC", "plant state": "TX", "plant id": "66926", "generator id": "SMTNM", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66926", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Mercedes LLC", "name_short": "SMT Mercedes", "owner": "SMT Mercedes LLC", "state": "texas", "country": "usa", "lat": "33.552321404211234", "long": "-95.57587397218185", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.552321404211234+-95.57587397218185", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Mission LLC", "city": "", "id": "1070", "external_id": "66927", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Mission LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1070", "external_id": "66927", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Mission LLC", "external_id": "66927", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Mission LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTMB": {"first": {"year": "2023", "month": "11", "entity id": "65839", "entity name": "SMT Mission LLC", "plant producer type": "IPP", "plant name": "SMT Mission LLC", "plant state": "TX", "plant id": "66927", "generator id": "SMTMB", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66927", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65839", "entity name": "SMT Mission LLC", "plant producer type": "IPP", "plant name": "SMT Mission LLC", "plant state": "TX", "plant id": "66927", "generator id": "SMTMB", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66927", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Mission LLC", "name_short": "SMT Mission", "owner": "SMT Mission LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.413438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.413438", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Santa Rosa LLC", "city": "", "id": "1071", "external_id": "66928", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Santa Rosa LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1071", "external_id": "66928", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Santa Rosa LLC", "external_id": "66928", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Santa Rosa LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTSR": {"first": {"year": "2023", "month": "11", "entity id": "65844", "entity name": "SMT Santa Rosa LLC", "plant producer type": "IPP", "plant name": "SMT Santa Rosa LLC", "plant state": "TX", "plant id": "66928", "generator id": "SMTSR", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66928", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65844", "entity name": "SMT Santa Rosa LLC", "plant producer type": "IPP", "plant name": "SMT Santa Rosa LLC", "plant state": "TX", "plant id": "66928", "generator id": "SMTSR", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66928", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Santa Rosa LLC", "name_short": "SMT Santa Rosa", "owner": "SMT Santa Rosa LLC", "state": "texas", "country": "usa", "lat": "33.403993246911256", "long": "-95.42750915563981", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.403993246911256+-95.42750915563981", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Elsa LLC", "city": "", "id": "1072", "external_id": "66931", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Elsa LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1072", "external_id": "66931", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Elsa LLC", "external_id": "66931", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Elsa LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTEL": {"first": {"year": "2023", "month": "12", "entity id": "65841", "entity name": "SMT Elsa LLC", "plant producer type": "IPP", "plant name": "SMT Elsa LLC", "plant state": "TX", "plant id": "66931", "generator id": "SMTEL", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66931", "date": "2023-12", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65841", "entity name": "SMT Elsa LLC", "plant producer type": "IPP", "plant name": "SMT Elsa LLC", "plant state": "TX", "plant id": "66931", "generator id": "SMTEL", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66931", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Elsa LLC", "name_short": "SMT Elsa", "owner": "SMT Elsa LLC", "state": "texas", "country": "usa", "lat": "33.345901513578184", "long": "-95.42229712696499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.345901513578184+-95.42229712696499", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Los Fresnos LLC", "city": "", "id": "1073", "external_id": "66932", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Los Fresnos LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1073", "external_id": "66932", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Los Fresnos LLC", "external_id": "66932", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Los Fresnos LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTLF": {"first": {"year": "2023", "month": "12", "entity id": "65840", "entity name": "SMT Los Fresnos LLC", "plant producer type": "IPP", "plant name": "SMT Los Fresnos LLC", "plant state": "TX", "plant id": "66932", "generator id": "SMTLF", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66932", "date": "2023-12", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65840", "entity name": "SMT Los Fresnos LLC", "plant producer type": "IPP", "plant name": "SMT Los Fresnos LLC", "plant state": "TX", "plant id": "66932", "generator id": "SMTLF", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66932", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Los Fresnos LLC", "name_short": "SMT Los Fresnos", "owner": "SMT Los Fresnos LLC", "state": "texas", "country": "usa", "lat": "33.28739649915876", "long": "-95.39452176197224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.28739649915876+-95.39452176197224", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Rio Grande I LLC", "city": "", "id": "1074", "external_id": "66934", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Rio Grande I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1074", "external_id": "66934", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Rio Grande I LLC", "external_id": "66934", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Rio Grande I LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTR1": {"first": {"year": "2023", "month": "12", "entity id": "65845", "entity name": "SMT Rio Grande I LLC", "plant producer type": "IPP", "plant name": "SMT Rio Grande I LLC", "plant state": "TX", "plant id": "66934", "generator id": "SMTR1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66934", "date": "2023-12", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65845", "entity name": "SMT Rio Grande I LLC", "plant producer type": "IPP", "plant name": "SMT Rio Grande I LLC", "plant state": "TX", "plant id": "66934", "generator id": "SMTR1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66934", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Rio Grande I LLC", "name_short": "SMT Rio Grande I", "owner": "SMT Rio Grande I LLC", "state": "texas", "country": "usa", "lat": "33.23721311428471", "long": "-95.34389387471748", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.23721311428471+-95.34389387471748", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Rio Grande II LLC", "city": "", "id": "1075", "external_id": "66935", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Rio Grande II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1075", "external_id": "66935", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Rio Grande II LLC", "external_id": "66935", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Rio Grande II LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTR2": {"first": {"year": "2023", "month": "12", "entity id": "65846", "entity name": "SMT Rio Grande II LLC", "plant producer type": "IPP", "plant name": "SMT Rio Grande II LLC", "plant state": "TX", "plant id": "66935", "generator id": "SMTR2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66935", "date": "2023-12", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65846", "entity name": "SMT Rio Grande II LLC", "plant producer type": "IPP", "plant name": "SMT Rio Grande II LLC", "plant state": "TX", "plant id": "66935", "generator id": "SMTR2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66935", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Rio Grande II LLC", "name_short": "SMT Rio Grande II", "owner": "SMT Rio Grande II LLC", "state": "texas", "country": "usa", "lat": "33.204054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.204054+-95.273438", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bouldercombe", "city": "", "id": "119", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Genex Power", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "40", "status": "operation", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-23.537188", "long": "150.48991", "coords_hint": "3", "use_case": "", "notes": "used the date of the tweet as operation start date", "project_website": "https://www.genexpower.com.au/bouldercombe-battery-project.html", "link1": "https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "link2": "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "link3": "https://twitter.com/SawyerMerritt/status/1722857295078383700", "link4": ""}, "internal_id": "119", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Bouldercombe", "name_short": "Bouldercombe", "owner": "Genex Power", "state": "queensland", "country": "australia", "lat": "-23.537188", "long": "150.48991", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-23.537188+150.48991", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 40, "notes_split": ["used the date of the tweet as operation start date"], "links": ["https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "https://twitter.com/SawyerMerritt/status/1722857295078383700"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "West Didsbury Battery Storage", "city": "", "id": "363", "external_id": "7185", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "363", "external_id": "7185", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Didsbury Battery Storage", "external_id": "7185", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy / Gresham House", "status": "operation", "date_first_heard": "2017-12-20", "start_construction": "2022-06-01", "start_operation": "2023-11-21", "start_estimated": "", "month_disappeared": "", "lat": "53.418818", "long": "-2.280893", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7185", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy", "Site Name": "West Didsbury Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sawfield Nurseries Fairy Lane, Sale", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M33 2JU", "X-coordinate": "381429", "Y-coordinate": "391372", "Planning Authority": "Trafford Council", "Planning Application Reference": "92459/FUL/17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.418818", "long": "-2.280893", "status": "planning", "mw": 50, "ext_id": "7185"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "23/08/2022", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "50", "to": "49.99", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 50, "to": 49, "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/08/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "24/11/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Statera Energy", "to": "Statera Energy / Gresham House", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "21/11/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7185", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Statera Energy / Gresham House", "Site Name": "West Didsbury Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sawfield Nurseries Fairy Lane, Sale", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M33 2JU", "X-coordinate": "381429", "Y-coordinate": "391372", "Planning Authority": "Trafford Council", "Planning Application Reference": "92459/FUL/17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2020", "Under Construction": "01/06/2022", "Operational": "21/11/2023", "Heat Network Ref": "", "lat": "53.418818", "long": "-2.280893", "status": "operation", "mw": 49, "ext_id": "7185"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "2022-08-23", "start_operation": "2023-11-24"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-12-20", "start_construction": "2022-06-01", "start_operation": "2023-11-21", "start_estimated": "", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "West Didsbury Battery Storage", "name_short": "West Didsbury", "owner": "Statera Energy / Gresham House", "state": "north west", "country": "uk", "lat": "53.418818", "long": "-2.280893", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.418818+-2.280893", "construction_time_month": 17, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dry Bridge Storage", "city": "", "id": "565", "external_id": "65044", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Dominion Energy Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "565", "external_id": "65044", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dry Bridge Storage", "external_id": "65044", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Dominion Energy Inc.", "status": "operation", "date_first_heard": "2021-11", "start_construction": "2022-10", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DBES": {"first": {"year": "2022", "month": "12", "entity id": "5248", "entity name": "Dominion Energy Inc", "plant producer type": "Electric Utility", "plant name": "Dry Bridge Storage", "plant state": "VA", "plant id": "65044", "generator id": "DBES", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65044", "date": "2022-12", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-02", "li": [{"name": "date", "from": "2022-12", "to": "2022-10", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "entity name", "from": "Dominion Energy Inc", "to": "Dominion Energy Inc.", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-04", "to": "2023-09", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2023-11", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "11", "entity id": "5248", "entity name": "Dominion Energy Inc.", "plant producer type": "Electric Utility", "plant name": "Dry Bridge Storage", "plant state": "VA", "plant id": "65044", "generator id": "DBES", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65044", "date": "2023-11", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2021-11", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "2022-10", "start_operation": "2023-11", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Dry Bridge Storage", "name_short": "Dry Bridge", "owner": "Dominion Energy Inc.", "state": "virginia", "country": "usa", "lat": "38.390223", "long": "-77.80875", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.390223+-77.80875", "construction_time_month": 13, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E1B", "city": "", "id": "698", "external_id": "65674", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "280", "power_mw": "140", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "698", "external_id": "65674", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E1B", "external_id": "65674", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 272, "power_mw": 136, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "8", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E1B", "plant state": "CA", "plant id": "65674", "generator id": "BESS", "net summer capacity (mw)": "140.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65674", "date": "2023-08", "mw": 140}, "first_month": "2022-06", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 140, "to": 136, "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E1B", "plant state": "CA", "plant id": "65674", "generator id": "BESS", "net summer capacity (mw)": "136", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65674", "date": "2023-11", "mw": 136}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 136, "mwh_is_estimate": true, "mwh": 272, "mwh_estimate": 272, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Edwards Sanborn E1B", "name_short": "Edwards Sanborn E1B", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "40.91342545018388", "long": "-121.01203895000252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.91342545018388+-121.01203895000252", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E4", "city": "", "id": "703", "external_id": "65675", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "218", "power_mw": "109", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "703", "external_id": "65675", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E4", "external_id": "65675", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "2", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E4", "plant state": "CA", "plant id": "65675", "generator id": "BESS", "net summer capacity (mw)": "109.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65675", "date": "2023-02", "mw": 109}, "first_month": "2022-06", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-04", "to": "2023-07", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-07", "to": "2023-04", "extra": "accelerated by 3 months", "change_type": "timing"}, {"name": "mw", "from": 109, "to": 100, "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E4", "plant state": "CA", "plant id": "65675", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65675", "date": "2023-11", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "2023-02", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Edwards Sanborn E4", "name_short": "Edwards Sanborn E4", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.17607212162875", "long": "-121.2612551733487", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17607212162875+-121.2612551733487", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E5", "city": "", "id": "706", "external_id": "65676", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "706", "external_id": "65676", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E5", "external_id": "65676", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 94, "power_mw": 47, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E5", "plant state": "CA", "plant id": "65676", "generator id": "BESS", "net summer capacity (mw)": "75.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65676", "date": "2022-12", "mw": 75}, "first_month": "2022-06", "changes": [{"month": "2022-08", "li": [{"name": "date", "from": "2022-12", "to": "2023-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 75, "to": 47, "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E5", "plant state": "CA", "plant id": "65676", "generator id": "BESS", "net summer capacity (mw)": "47", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65676", "date": "2023-11", "mw": 47}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 47, "mwh_is_estimate": true, "mwh": 94, "mwh_estimate": 94, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Edwards Sanborn E5", "name_short": "Edwards Sanborn E5", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.248216460150964", "long": "-121.34083924325749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.248216460150964+-121.34083924325749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sanborn EBESS1", "city": "", "id": "708", "external_id": "65673", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "114", "power_mw": "57", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "708", "external_id": "65673", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sanborn BESS 4", "external_id": "65673", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 94, "power_mw": 47, "owner": "Terra-Gen Operating Co-BESS", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "1", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn EBESS1", "plant state": "CA", "plant id": "65673", "generator id": "BESS", "net summer capacity (mw)": "57.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65673", "date": "2023-01", "mw": 57}, "first_month": "2022-06", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-01", "to": "2023-06", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 57, "to": 47, "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-08", "to": "2023-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "plant name", "from": "Sanborn EBESS1", "to": "Sanborn BESS 4", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2023-11", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "11", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 4", "plant state": "CA", "plant id": "65673", "generator id": "BESS", "net summer capacity (mw)": "47", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65673", "date": "2023-11", "mw": 47}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 47, "mwh_is_estimate": true, "mwh": 94, "mwh_estimate": 94, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "2023-01", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Sanborn BESS 4", "name_short": "Sanborn BESS 4", "owner": "Terra-Gen Operating Co-BESS", "state": "california", "country": "usa", "lat": "41.226127204403475", "long": "-121.44243599100999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.226127204403475+-121.44243599100999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stanton Battery Energy Storage", "city": "", "id": "958", "external_id": "66423", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "136", "power_mw": "68", "customer": "", "owner": "Wellhead Services, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "958", "external_id": "66423", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Stanton Battery Energy Storage", "external_id": "66423", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 136, "power_mw": 68, "owner": "Wellhead Services, Inc", "status": "operation", "date_first_heard": "2023-04", "start_construction": "2023-06", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2023", "month": "8", "entity id": "20323", "entity name": "Wellhead Services, Inc", "plant producer type": "IPP", "plant name": "Stanton Battery Energy Storage", "plant state": "CA", "plant id": "66423", "generator id": "BESS1", "net summer capacity (mw)": "68.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66423", "date": "2023-08", "mw": 68}, "first_month": "2023-04", "changes": [{"month": "2023-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "20323", "entity name": "Wellhead Services, Inc", "plant producer type": "IPP", "plant name": "Stanton Battery Energy Storage", "plant state": "CA", "plant id": "66423", "generator id": "BESS1", "net summer capacity (mw)": "68.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66423", "date": "2023-11", "mw": 68}, "current_month": "2024-02", "dates": {"first_heard": "2023-04", "start_construction": "2023-06"}, "month_disappeared": ""}}, "mw": 68, "mwh_is_estimate": true, "mwh": 136, "mwh_estimate": 136, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-04", "start_construction": "2023-06", "start_operation": "2023-11", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Stanton Battery Energy Storage", "name_short": "Stanton", "owner": "Wellhead Services, Inc", "state": "california", "country": "usa", "lat": "40.96044827036728", "long": "-121.07676030955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.96044827036728+-121.07676030955251", "construction_time_month": 5, "construction_speed_mwh_per_month": 27, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Bay City LLC", "city": "", "id": "1066", "external_id": "66930", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Bay City LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1066", "external_id": "66930", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Bay City LLC", "external_id": "66930", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Bay City LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTBC": {"first": {"year": "2023", "month": "10", "entity id": "65842", "entity name": "SMT Bay City LLC", "plant producer type": "IPP", "plant name": "SMT Bay City LLC", "plant state": "TX", "plant id": "66930", "generator id": "SMTBC", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66930", "date": "2023-10", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "65842", "entity name": "SMT Bay City LLC", "plant producer type": "IPP", "plant name": "SMT Bay City LLC", "plant state": "TX", "plant id": "66930", "generator id": "SMTBC", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66930", "date": "2023-11", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-11", "start_estimated": "2023-10", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "SMT Bay City LLC", "name_short": "SMT Bay City", "owner": "SMT Bay City LLC", "state": "texas", "country": "usa", "lat": "33.69372024210638", "long": "-95.35131028258249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.69372024210638+-95.35131028258249", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Riverina 1 + 2 / Darlington Point Energy Storage", "city": "Darlington Point", "id": "45", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "Edify Energy / Shell", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.646927", "long": "146.03516", "coords_hint": "1", "use_case": "333MW solar farm support", "notes": "it says on the project website that the 3 projects are colocated, so combined them here into just one entry", "project_website": "https://edifyenergy.com/project/riverina-darlington-point/", "link1": "https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "link2": "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "link3": "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "link4": "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"}, "internal_id": "45", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Riverina 1 + 2 / Darlington Point Energy Storage", "name_short": "Riverina 1 + 2 / Darlington Point", "owner": "", "state": "new south wales", "country": "australia", "lat": "-34.646927", "long": "146.03516", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.646927+146.03516", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["it says on the project website that the 3 projects are colocated, so combined them here into just one entry"], "links": ["https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bustleholme Substation", "city": "", "id": "426", "external_id": "7907", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "426", "external_id": "7907", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bustleholme Substation", "external_id": "7907", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "operation", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "2023-10-20", "start_estimated": "", "month_disappeared": "", "lat": "52.553231", "long": "-1.957038", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7907", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Pivot Power", "Site Name": "Bustleholme Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Western Power Distribution Bus, Woodruff Way, Walsall, West Midlands", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS5 4RA", "X-coordinate": "403010", "Y-coordinate": "295044", "Planning Authority": "Sandwell Metropolitan Borough Council", "Planning Application Reference": "DC/20/64437", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.553231", "long": "-1.957038", "status": "planning", "mw": 49, "ext_id": "7907"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "20/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7907", "Record Last Updated (dd/mm/yyyy)": "20/10/2023", "Operator (or Applicant)": "Pivot Power", "Site Name": "Bustleholme Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Western Power Distribution Bus, Woodruff Way, Walsall, West Midlands", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS5 4RA", "X-coordinate": "403010", "Y-coordinate": "295044", "Planning Authority": "Sandwell Metropolitan Borough Council", "Planning Application Reference": "DC/20/64437", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.553231", "long": "-1.957038", "status": "operation", "mw": 49, "ext_id": "7907"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": "2023-10-20"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "2023-10-20", "start_estimated": "", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Bustleholme Substation", "name_short": "Bustleholme Substation", "owner": "Pivot Power", "state": "west midlands", "country": "uk", "lat": "52.553231", "long": "-1.957038", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.553231+-1.957038", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sanborn BESS 3", "city": "", "id": "695", "external_id": "65672", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "175", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "695", "external_id": "65672", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sanborn BESS 3", "external_id": "65672", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 338, "power_mw": 169, "owner": "Terra-Gen Operating Co-BESS", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "5", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 3", "plant state": "CA", "plant id": "65672", "generator id": "BESS", "net summer capacity (mw)": "175.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65672", "date": "2023-05", "mw": 175}, "first_month": "2022-06", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-05", "to": "2023-08", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 175, "to": 169, "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "10", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 3", "plant state": "CA", "plant id": "65672", "generator id": "BESS", "net summer capacity (mw)": "169", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65672", "date": "2023-10", "mw": 169}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 169, "mwh_is_estimate": true, "mwh": 338, "mwh_estimate": 338, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023-05", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Sanborn BESS 3", "name_short": "Sanborn BESS 3", "owner": "Terra-Gen Operating Co-BESS", "state": "california", "country": "usa", "lat": "40.832677000000004", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.832677000000004+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Raith (Glenniston)", "city": "Auchtertool", "id": "824", "external_id": "11808", "state": "fife", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49.5", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-little-raith-bess/", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary", "link3": "", "link4": ""}, "internal_id": "824", "external_id": "11808", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gleniston, Auchtertool - Battery Storage Facility", "external_id": "11808", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2022-11-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11808", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Gleniston, Auchtertool - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Battery Storage Facility Gleniston Auchtertool ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "22/02323/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 49, "ext_id": "11808"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/08/2022", "to": "11/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "09/11/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11808", "Record Last Updated (dd/mm/yyyy)": "11/11/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Gleniston, Auchtertool - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Battery Storage Facility Gleniston Auchtertool ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "22/02323/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 49, "ext_id": "11808"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 99, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11-09", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Gleniston, Auchtertool - Battery Storage Facility", "name_short": "Gleniston, Auchtertool", "owner": "Harmony Energy Limited", "state": "scotland", "country": "uk", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.11287+-3.271262", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bumpers", "city": "Princes Risborough", "id": "844", "external_id": "", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "56", "status": "operation", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.7485", "long": "-0.88913", "coords_hint": "1", "use_case": "", "notes": "Construction dates from TTRO application", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-bumpers-bess/", "link1": "https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "link2": "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "link3": "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "link4": "https://twitter.com/heitplc/status/1679460677226823680"}, "internal_id": "844", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 99, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Bumpers", "name_short": "Bumpers", "owner": "Harmony Energy Income Trust", "state": "buckinghamshire", "country": "uk", "lat": "51.7485", "long": "-0.88913", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.7485+-0.88913", "construction_time_month": 12, "construction_speed_mwh_per_month": 16, "no_of_battery_units": 56, "notes_split": ["Construction dates from TTRO application"], "links": ["https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "https://twitter.com/heitplc/status/1679460677226823680"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Storey Energy Center", "city": "Coolidge", "id": "67", "external_id": "65956", "state": "arizona", "country": "usa", "capacity_mwh": "264", "estimate_mwh": "", "power_mw": "88", "customer": "Salt River Project", "owner": "NextEra Energy Resources", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.8882", "long": "-111.4978", "coords_hint": "1", "use_case": "88 MW solar farm support", "notes": "", "project_website": "https://www.nexteraenergyresources.com/storey-solar.html", "link1": "https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/Storey%20Solar%20Open%20House%20Slides_final%20for%20NEER%20website.pdf", "link2": "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "link3": "", "link4": ""}, "internal_id": "67", "external_id": "65956", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Storey Solar and Storage", "external_id": "65956", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 176, "power_mw": 88, "owner": "Storey Energy Center, LLC", "status": "operation", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"STOBA": {"first": {"year": "2023", "month": "7", "entity id": "64801", "entity name": "Storey Energy Center, LLC", "plant producer type": "IPP", "plant name": "Storey Solar and Storage", "plant state": "AZ", "plant id": "65956", "generator id": "STOBA", "net summer capacity (mw)": "88", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65956", "date": "2023-07", "mw": 88}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "64801", "entity name": "Storey Energy Center, LLC", "plant producer type": "IPP", "plant name": "Storey Solar and Storage", "plant state": "AZ", "plant id": "65956", "generator id": "STOBA", "net summer capacity (mw)": "88", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65956", "date": "2023-09", "mw": 88}, "current_month": "2024-02", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 88, "mwh_is_estimate": false, "mwh": 264, "mwh_estimate": 176, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "2023-09", "start_estimated": "2023Q2", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Storey Solar and Storage", "name_short": "Storey Solar", "owner": "Storey Energy Center, LLC", "state": "arizona", "country": "usa", "lat": "32.8882", "long": "-111.4978", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.8882+-111.4978", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/Storey%20Solar%20Open%20House%20Slides_final%20for%20NEER%20website.pdf", "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fifth Standard Solar PV, LLC (Hybrid)", "city": "", "id": "168", "external_id": "64197", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "234", "power_mw": "117", "customer": "", "owner": "RWE Renewables Americas LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "168", "external_id": "64197", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Fifth Standard Solar PV, LLC (Hybrid)", "external_id": "64197", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 234, "power_mw": 117, "owner": "RWE Renewables Americas, LLC", "status": "operation", "date_first_heard": "2021-01", "start_construction": "2022-11", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FTHSB": {"first": {"year": "2022", "month": "12", "entity id": "56215", "entity name": "RWE Renewables Americas LLC", "plant producer type": "IPP", "plant name": "Fifth Standard Solar PV, LLC", "plant state": "CA", "plant id": "64197", "generator id": "FTHSB", "net summer capacity (mw)": "117", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64197", "date": "2022-12", "mw": 117}, "first_month": "2021-01", "changes": [{"month": "2021-02", "li": [{"name": "plant name", "from": "Fifth Standard Solar PV, LLC", "to": "Fifth Standard Solar PV, LLC (Hybrid)", "extra": "", "change_type": "misc"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2022-12", "to": "2022-09", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-12", "to": "2023-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "entity name", "from": "RWE Renewables Americas LLC", "to": "RWE Renewables Americas, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-10", "to": "2023-08", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "56215", "entity name": "RWE Renewables Americas, LLC", "plant producer type": "IPP", "plant name": "Fifth Standard Solar PV, LLC (Hybrid)", "plant state": "CA", "plant id": "64197", "generator id": "FTHSB", "net summer capacity (mw)": "117", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64197", "date": "2023-09", "mw": 117}, "current_month": "2024-02", "dates": {"first_heard": "2021-01", "start_construction": "2022-11"}, "month_disappeared": ""}}, "mw": 117, "mwh_is_estimate": true, "mwh": 234, "mwh_estimate": 234, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-01", "start_construction": "2022-11", "start_operation": "2023-09", "start_estimated": "2022-09", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Fifth Standard Solar PV, LLC (Hybrid)", "name_short": "Fifth Standard Solar PV, LLC (Hybri...", "owner": "RWE Renewables Americas, LLC", "state": "california", "country": "usa", "lat": "41.296661434678576", "long": "-121.53951803033499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.296661434678576+-121.53951803033499", "construction_time_month": 10, "construction_speed_mwh_per_month": 23, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oberon Solar Project", "city": "", "id": "701", "external_id": "65734", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "IP Oberon LLC", "developer": "Intersect Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.717864", "long": "-115.358576", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "link2": "http://www.aspeneg.com/oberon-renewable-energy-project/", "link3": "", "link4": ""}, "internal_id": "701", "external_id": "65734", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Oberon Solar Project", "external_id": "65734", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "IP Oberon LLC", "status": "operation", "date_first_heard": "2022-08", "start_construction": "2022-09", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OBIBS": {"first": {"year": "2023", "month": "6", "entity id": "64971", "entity name": "IP Oberon LLC", "plant producer type": "IPP", "plant name": "Oberon Solar Project", "plant state": "CA", "plant id": "65734", "generator id": "OBIBS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65734", "date": "2023-06", "mw": 125}, "first_month": "2022-08", "changes": [{"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "64971", "entity name": "IP Oberon LLC", "plant producer type": "IPP", "plant name": "Oberon Solar Project", "plant state": "CA", "plant id": "65734", "generator id": "OBIBS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65734", "date": "2023-09", "mw": 125}, "current_month": "2024-02", "dates": {"first_heard": "2022-08", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "2022-09", "start_operation": "2023-09", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Oberon Solar Project", "name_short": "Oberon Solar", "owner": "IP Oberon LLC", "state": "california", "country": "usa", "lat": "33.717864", "long": "-115.358576", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.717864+-115.358576", "construction_time_month": 12, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "http://www.aspeneg.com/oberon-renewable-energy-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oberon II Solar Project", "city": "", "id": "702", "external_id": "65735", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "IP Oberon II, LLC", "developer": "Intersect Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.718247", "long": "-115.35194", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "link2": "http://www.aspeneg.com/oberon-renewable-energy-project/", "link3": "", "link4": ""}, "internal_id": "702", "external_id": "65735", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Oberon II Solar Project", "external_id": "65735", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "IP Oberon II, LLC", "status": "operation", "date_first_heard": "2022-08", "start_construction": "2022-12", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OBIIB": {"first": {"year": "2023", "month": "9", "entity id": "64972", "entity name": "IP Oberon II, LLC", "plant producer type": "IPP", "plant name": "Oberon II Solar Project", "plant state": "CA", "plant id": "65735", "generator id": "OBIIB", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65735", "date": "2023-09", "mw": 125}, "first_month": "2022-08", "changes": [{"month": "2022-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "64972", "entity name": "IP Oberon II, LLC", "plant producer type": "IPP", "plant name": "Oberon II Solar Project", "plant state": "CA", "plant id": "65735", "generator id": "OBIIB", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65735", "date": "2023-09", "mw": 125}, "current_month": "2024-02", "dates": {"first_heard": "2022-08", "start_construction": "2022-12"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "2022-12", "start_operation": "2023-09", "start_estimated": "2023-09", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Oberon II Solar Project", "name_short": "Oberon II Solar", "owner": "IP Oberon II, LLC", "state": "california", "country": "usa", "lat": "33.718247", "long": "-115.35194", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.718247+-115.35194", "construction_time_month": 9, "construction_speed_mwh_per_month": 27, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "http://www.aspeneg.com/oberon-renewable-energy-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Saint Energy Storage II LLC", "city": "", "id": "1010", "external_id": "66716", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Saint Energy Storage II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1010", "external_id": "66716", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Saint Energy Storage II LLC", "external_id": "66716", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Saint Energy Storage II LLC", "status": "operation", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SB123": {"first": {"year": "2023", "month": "7", "entity id": "65727", "entity name": "Saint Energy Storage II LLC", "plant producer type": "IPP", "plant name": "Saint Energy Storage II LLC", "plant state": "AZ", "plant id": "66716", "generator id": "SB123", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66716", "date": "2023-07", "mw": 100}, "first_month": "2023-07", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "65727", "entity name": "Saint Energy Storage II LLC", "plant producer type": "IPP", "plant name": "Saint Energy Storage II LLC", "plant state": "AZ", "plant id": "66716", "generator id": "SB123", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66716", "date": "2023-09", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "2023-09", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Saint Energy Storage II LLC", "name_short": "Saint Energy Storage II", "owner": "Saint Energy Storage II LLC", "state": "arizona", "country": "usa", "lat": "36.478429", "long": "-109.905254", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.478429+-109.905254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mohave Energy - Hybrid", "city": "", "id": "1308", "external_id": "67178", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Mohave Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1308", "external_id": "67178", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mohave Energy - Hybrid", "external_id": "67178", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Mohave Energy", "status": "operation", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MEBA": {"first": {"year": "2023", "month": "9", "entity id": "66056", "entity name": "Mohave Energy", "plant producer type": "Electric Utility", "plant name": "Mohave Energy - Hybrid", "plant state": "AZ", "plant id": "67178", "generator id": "MEBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "67178", "date": "2023-09", "mw": 15}, "first_month": "2024-02", "changes": [], "current": {"year": "2023", "month": "9", "entity id": "66056", "entity name": "Mohave Energy", "plant producer type": "Electric Utility", "plant name": "Mohave Energy - Hybrid", "plant state": "AZ", "plant id": "67178", "generator id": "MEBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "67178", "date": "2023-09", "mw": 15}, "current_month": "2024-02", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Mohave Energy - Hybrid", "name_short": "Mohave Energy", "owner": "Mohave Energy", "state": "arizona", "country": "usa", "lat": "36.58187920440347", "long": "-110.02764099100999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.58187920440347+-110.02764099100999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Resurgence Solar", "city": "", "id": "169", "external_id": "64489", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "230", "power_mw": "115", "customer": "", "owner": "Resurgence Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "169", "external_id": "64489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Resurgence Solar", "external_id": "64489", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Resurgence Solar", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2023-03", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN2": {"first": {"year": "2022", "month": "12", "entity id": "64135", "entity name": "Resurgence Solar", "plant producer type": "IPP", "plant name": "Resurgence Solar", "plant state": "CA", "plant id": "64489", "generator id": "GEN2", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64489", "date": "2022-12", "mw": 115}, "first_month": "2021-04", "changes": [{"month": "2022-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-12", "to": "2023-05", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-05", "to": "2023-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 115, "to": 75, "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "64135", "entity name": "Resurgence Solar", "plant producer type": "IPP", "plant name": "Resurgence Solar", "plant state": "CA", "plant id": "64489", "generator id": "GEN2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64489", "date": "2023-08", "mw": 75}, "current_month": "2024-02", "dates": {"first_heard": "2021-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2023-03", "start_operation": "2023-08", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "Resurgence Solar", "name_short": "Resurgence Solar", "owner": "Resurgence Solar", "state": "california", "country": "usa", "lat": "41.22094440421124", "long": "-121.60248497218186", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.22094440421124+-121.60248497218186", "construction_time_month": 5, "construction_speed_mwh_per_month": 30, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Energy Centre Royal Mint", "city": "", "id": "403", "external_id": "7684", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Infinite Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-12-09", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "403", "external_id": "7684", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Energy Centre Royal Mint", "external_id": "7684", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Infinite Energy Renewables", "status": "operation", "date_first_heard": "2019-12-09", "start_construction": "2022-05-01", "start_operation": "2023-08-01", "start_estimated": "", "month_disappeared": "", "lat": "51.555048", "long": "-3.390758", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7684", "Record Last Updated (dd/mm/yyyy)": "17/08/2020", "Operator (or Applicant)": "Infinite Energy Renewables", "Site Name": "Energy Centre Royal Mint", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Royal Mint, Llantrisant, Pontyclun, Mid Glamorgan", "County": "Rhondda Cynon Taff", "Region": "Wales", "Country": "Wales", "Post Code": "CF72 8YT", "X-coordinate": "303676", "Y-coordinate": "184935", "Planning Authority": "Rhondda Cynon Taff County Borough Council", "Planning Application Reference": "19/1007/10", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/12/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/12/2024", "Under Construction": "01/04/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.555048", "long": "-3.390758", "status": "construction", "mw": 20, "ext_id": "7684"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/08/2020", "to": "16/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/04/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/02/2022", "to": "01/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/08/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7684", "Record Last Updated (dd/mm/yyyy)": "01/08/2023", "Operator (or Applicant)": "Infinite Energy Renewables", "Site Name": "Energy Centre Royal Mint", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Royal Mint, Llantrisant, Pontyclun, Mid Glamorgan", "County": "Rhondda Cynon Taff", "Region": "Wales", "Country": "Wales", "Post Code": "CF72 8YT", "X-coordinate": "303676", "Y-coordinate": "184935", "Planning Authority": "Rhondda Cynon Taff County Borough Council", "Planning Application Reference": "19/1007/10", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/12/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/12/2024", "Under Construction": "01/05/2022", "Operational": "01/08/2023", "Heat Network Ref": "", "lat": "51.555048", "long": "-3.390758", "status": "operation", "mw": 20, "ext_id": "7684"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-17", "start_construction": "", "start_operation": "2023-08-01"}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-12-09", "start_construction": "2022-05-01", "start_operation": "2023-08-01", "start_estimated": "", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "Energy Centre Royal Mint", "name_short": "Energy Centre Royal Mint", "owner": "Infinite Energy Renewables", "state": "wales", "country": "uk", "lat": "51.555048", "long": "-3.390758", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.555048+-3.390758", "construction_time_month": 15, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cunningham Storage", "city": "", "id": "627", "external_id": "65410", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "380", "power_mw": "190", "customer": "", "owner": "BT Cunningham Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "627", "external_id": "65410", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cunningham Storage", "external_id": "65410", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 380, "power_mw": 190, "owner": "Acciona Energy USA Global, LLC", "status": "operation", "date_first_heard": "2022-03", "start_construction": "2022-09", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SPUT": {"first": {"year": "2022", "month": "12", "entity id": "64757", "entity name": "BT Cunningham Storage, LLC", "plant producer type": "IPP", "plant name": "Cunningham Storage", "plant state": "TX", "plant id": "65410", "generator id": "SPUT", "net summer capacity (mw)": "190", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65410", "date": "2022-12", "mw": 190}, "first_month": "2022-03", "changes": [{"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "entity id", "from": "64757", "to": "57416", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "BT Cunningham Storage, LLC", "to": "Acciona Energy USA Global, LLC", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "57416", "entity name": "Acciona Energy USA Global, LLC", "plant producer type": "IPP", "plant name": "Cunningham Storage", "plant state": "TX", "plant id": "65410", "generator id": "SPUT", "net summer capacity (mw)": "190", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65410", "date": "2023-08", "mw": 190}, "current_month": "2024-02", "dates": {"first_heard": "2022-03", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 190, "mwh_is_estimate": true, "mwh": 380, "mwh_estimate": 380, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-03", "start_construction": "2022-09", "start_operation": "2023-08", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "Cunningham Storage", "name_short": "Cunningham", "owner": "Acciona Energy USA Global, LLC", "state": "texas", "country": "usa", "lat": "33.61100329690874", "long": "-95.38746833894474", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.61100329690874+-95.38746833894474", "construction_time_month": 11, "construction_speed_mwh_per_month": 34, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Central Valley", "city": "", "id": "933", "external_id": "66208", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "132", "customer": "", "owner": "North Central Valley Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "933", "external_id": "66208", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "North Central Valley", "external_id": "66208", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 264, "power_mw": 132, "owner": "North Central Valley Energy Storage, LLC", "status": "operation", "date_first_heard": "2023-02", "start_construction": "2023-05", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NCV": {"first": {"year": "2023", "month": "8", "entity id": "65339", "entity name": "North Central Valley Energy Storage, LLC", "plant producer type": "IPP", "plant name": "North Central Valley", "plant state": "CA", "plant id": "66208", "generator id": "NCV", "net summer capacity (mw)": "132", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66208", "date": "2023-08", "mw": 132}, "first_month": "2023-02", "changes": [{"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "65339", "entity name": "North Central Valley Energy Storage, LLC", "plant producer type": "IPP", "plant name": "North Central Valley", "plant state": "CA", "plant id": "66208", "generator id": "NCV", "net summer capacity (mw)": "132", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66208", "date": "2023-08", "mw": 132}, "current_month": "2024-02", "dates": {"first_heard": "2023-02", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 132, "mwh_is_estimate": true, "mwh": 264, "mwh_estimate": 264, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "2023-05", "start_operation": "2023-08", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "North Central Valley", "name_short": "North Central Valley", "owner": "North Central Valley Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.02074085870876", "long": "-121.37410994178886", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.02074085870876+-121.37410994178886", "construction_time_month": 3, "construction_speed_mwh_per_month": 88, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "VESI Pomona", "city": "", "id": "960", "external_id": "50300", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI Pomona Energy Storage, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "960", "external_id": "50300", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "VESI Pomona", "external_id": "50300", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "VESI Pomona Energy Storage, Inc.", "status": "operation", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS2": {"first": {"year": "2023", "month": "5", "entity id": "54736", "entity name": "VESI Pomona Energy Storage, Inc.", "plant producer type": "IPP", "plant name": "VESI Pomona", "plant state": "CA", "plant id": "50300", "generator id": "BESS2", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "50300", "date": "2023-05", "mw": 20}, "first_month": "2023-03", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-10", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-08", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2023", "month": "8", "entity id": "54736", "entity name": "VESI Pomona Energy Storage, Inc.", "plant producer type": "IPP", "plant name": "VESI Pomona", "plant state": "CA", "plant id": "50300", "generator id": "BESS2", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "50300", "date": "2023-08", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-08", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "VESI Pomona", "name_short": "VESI Pomona", "owner": "VESI Pomona Energy Storage, Inc.", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.180049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.180049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BCE Los Alamitos 1", "city": "", "id": "965", "external_id": "66533", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Bright Canyon Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "965", "external_id": "66533", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "BCE Los Alamitos 1", "external_id": "66533", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Bright Canyon Energy", "status": "operation", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCE12": {"first": {"year": "2023", "month": "7", "entity id": "65534", "entity name": "Bright Canyon Energy", "plant producer type": "IPP", "plant name": "BCE Los Alamitos 1", "plant state": "CA", "plant id": "66533", "generator id": "BCE12", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66533", "date": "2023-07", "mw": 10}, "first_month": "2023-05", "changes": [{"month": "2023-06", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "65534", "entity name": "Bright Canyon Energy", "plant producer type": "IPP", "plant name": "BCE Los Alamitos 1", "plant state": "CA", "plant id": "66533", "generator id": "BCE12", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66533", "date": "2023-08", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "2023-08", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "BCE Los Alamitos 1", "name_short": "BCE Los Alamitos 1", "owner": "Bright Canyon Energy", "state": "california", "country": "usa", "lat": "41.352677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.352677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BCE Los Alamitos 2", "city": "", "id": "966", "external_id": "66532", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Bright Canyon Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "966", "external_id": "66532", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "BCE Los Alamitos 2", "external_id": "66532", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Bright Canyon Energy", "status": "operation", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCE22": {"first": {"year": "2023", "month": "7", "entity id": "65534", "entity name": "Bright Canyon Energy", "plant producer type": "IPP", "plant name": "BCE Los Alamitos 2", "plant state": "CA", "plant id": "66532", "generator id": "BCE22", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66532", "date": "2023-07", "mw": 10}, "first_month": "2023-05", "changes": [{"month": "2023-06", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "65534", "entity name": "Bright Canyon Energy", "plant producer type": "IPP", "plant name": "BCE Los Alamitos 2", "plant state": "CA", "plant id": "66532", "generator id": "BCE22", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66532", "date": "2023-08", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "2023-08", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "BCE Los Alamitos 2", "name_short": "BCE Los Alamitos 2", "owner": "Bright Canyon Energy", "state": "california", "country": "usa", "lat": "41.362343242106384", "long": "-121.37792128258249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.362343242106384+-121.37792128258249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Resurgence Solar II", "city": "", "id": "1018", "external_id": "66620", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Resurgence Solar II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1018", "external_id": "66620", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Resurgence Solar II", "external_id": "66620", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Resurgence Solar II", "status": "operation", "date_first_heard": "2023-06", "start_construction": "2023-07", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN2": {"first": {"year": "2023", "month": "7", "entity id": "65647", "entity name": "Resurgence Solar II", "plant producer type": "IPP", "plant name": "Resurgence Solar II", "plant state": "CA", "plant id": "66620", "generator id": "GEN2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66620", "date": "2023-07", "mw": 40}, "first_month": "2023-06", "changes": [{"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "65647", "entity name": "Resurgence Solar II", "plant producer type": "IPP", "plant name": "Resurgence Solar II", "plant state": "CA", "plant id": "66620", "generator id": "GEN2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66620", "date": "2023-08", "mw": 40}, "current_month": "2024-02", "dates": {"first_heard": "2023-06", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-06", "start_construction": "2023-07", "start_operation": "2023-08", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "Resurgence Solar II", "name_short": "Resurgence Solar II", "owner": "Resurgence Solar II", "state": "california", "country": "usa", "lat": "41.00747109055068", "long": "-121.14148166910252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.00747109055068+-121.14148166910252", "construction_time_month": 1, "construction_speed_mwh_per_month": 80, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sonoran Energy Center", "city": "Buckeye", "id": "63", "external_id": "66627", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "260", "customer": "Salt River Project", "owner": "NextEra Energy Resources", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.23927", "long": "-112.570054", "coords_hint": "2", "use_case": "solar", "notes": "", "project_website": "https://www.nexteraenergyresources.com/sonoran-solar/project-overview.html", "link1": "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "link2": "https://pv-magazine-usa.com/2021/08/11/nextera-will-build-a-solar-storage-project-with-salt-river-project-as-offtaker/", "link3": "", "link4": ""}, "internal_id": "63", "external_id": "66627", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sonoran Solar Energy", "external_id": "66627", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 520, "power_mw": 260, "owner": "Sonoran Solar Energy, LLC", "status": "operation", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SON13": {"first": {"year": "2023", "month": "6", "entity id": "65652", "entity name": "Sonoran Solar Energy, LLC", "plant producer type": "IPP", "plant name": "Sonoran Solar Energy", "plant state": "AZ", "plant id": "66627", "generator id": "SON13", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66627", "date": "2023-06", "mw": 260}, "first_month": "2023-06", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65652", "entity name": "Sonoran Solar Energy, LLC", "plant producer type": "IPP", "plant name": "Sonoran Solar Energy", "plant state": "AZ", "plant id": "66627", "generator id": "SON13", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66627", "date": "2023-07", "mw": 260}, "current_month": "2024-02", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 260, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 520, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2023Q2", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Sonoran Solar Energy", "name_short": "Sonoran Solar", "owner": "Sonoran Solar Energy, LLC", "state": "arizona", "country": "usa", "lat": "33.23927", "long": "-112.570054", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.23927+-112.570054", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "https://pv-magazine-usa.com/2021/08/11/nextera-will-build-a-solar-storage-project-with-salt-river-project-as-offtaker/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arroyo", "city": "McKinley County", "id": "101", "external_id": "63172", "state": "new mexico", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "PNM", "owner": "DE Shaw Renewable Investments (DSRI)", "developer": "Affordable Solar", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-03", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "450", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.9703", "long": "-107.5631", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ** the testimony link has a lot of info ** got the location info from the gem wiki", "project_website": "", "link1": "https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "link2": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link3": "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "link4": "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"}, "internal_id": "101", "external_id": "63172", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arroyo Solar Energy Storage Hybrid", "external_id": "63172", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Arroyo Solar LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-10", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARESS": {"first": {"year": "2022", "month": "6", "entity id": "62921", "entity name": "Arroyo Solar LLC", "plant producer type": "IPP", "plant name": "Arroyo Solar Energy Storage Hybrid", "plant state": "NM", "plant id": "63172", "generator id": "ARESS", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63172", "date": "2022-06", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "mw", "from": 40, "to": 150, "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "62921", "entity name": "Arroyo Solar LLC", "plant producer type": "IPP", "plant name": "Arroyo Solar Energy Storage Hybrid", "plant state": "NM", "plant id": "63172", "generator id": "ARESS", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63172", "date": "2023-07", "mw": 150}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-10"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-10", "start_operation": "2023-07", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Arroyo Solar Energy Storage Hybrid", "name_short": "Arroyo Solar", "owner": "Arroyo Solar LLC", "state": "new mexico", "country": "usa", "lat": "35.9703", "long": "-107.5631", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.9703+-107.5631", "construction_time_month": 21, "construction_speed_mwh_per_month": 28, "no_of_battery_units": 0, "notes_split": ["2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ", " the testimony link has a lot of info ", " got the location info from the gem wiki"], "links": ["https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Daggett 3", "city": "", "id": "165", "external_id": "64852", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "288", "power_mw": "144", "customer": "", "owner": "Daggett Solar Power 3 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "165", "external_id": "64852", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Daggett 3", "external_id": "64852", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 298, "power_mw": 149, "owner": "Daggett Solar Power 3 LLC", "status": "operation", "date_first_heard": "2021-09", "start_construction": "2022-02", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DAGGB": {"first": {"year": "2022", "month": "12", "entity id": "64365", "entity name": "Daggett Solar Power 3 LLC", "plant producer type": "IPP", "plant name": "Daggett 3", "plant state": "CA", "plant id": "64852", "generator id": "DAGGB", "net summer capacity (mw)": "144", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64852", "date": "2022-12", "mw": 144}, "first_month": "2021-09", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-12", "to": "2023-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "mw", "from": 144, "to": 149, "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-09", "to": "2023-06", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "64365", "entity name": "Daggett Solar Power 3 LLC", "plant producer type": "IPP", "plant name": "Daggett 3", "plant state": "CA", "plant id": "64852", "generator id": "DAGGB", "net summer capacity (mw)": "149", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64852", "date": "2023-07", "mw": 149}, "current_month": "2024-02", "dates": {"first_heard": "2021-09", "start_construction": "2022-02"}, "month_disappeared": ""}}, "mw": 149, "mwh_is_estimate": true, "mwh": 298, "mwh_estimate": 298, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "2022-02", "start_operation": "2023-07", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Daggett 3", "name_short": "Daggett 3", "owner": "Daggett Solar Power 3 LLC", "state": "california", "country": "usa", "lat": "41.352677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.352677+-121.300049", "construction_time_month": 17, "construction_speed_mwh_per_month": 17, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Willis Battery Storage", "city": "", "id": "235", "external_id": "63238", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "New York Power Authority", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "235", "external_id": "63238", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Willis Battery Storage", "external_id": "63238", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "New York Power Authority", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-06", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WB1": {"first": {"year": "2021", "month": "6", "entity id": "15296", "entity name": "New York Power Authority", "plant producer type": "Electric Utility", "plant name": "Willis Battery Storage", "plant state": "NY", "plant id": "63238", "generator id": "WB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63238", "date": "2021-06", "mw": 20}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-09", "to": "2022-03", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2022-03", "to": "2022-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-07", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2023", "month": "7", "entity id": "15296", "entity name": "New York Power Authority", "plant producer type": "Electric Utility", "plant name": "Willis Battery Storage", "plant state": "NY", "plant id": "63238", "generator id": "WB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63238", "date": "2023-07", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-06", "start_operation": "2023-07", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Willis Battery Storage", "name_short": "Willis", "owner": "New York Power Authority", "state": "new york", "country": "usa", "lat": "42.482006999999996", "long": "-75.50354", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.482006999999996+-75.50354", "construction_time_month": 25, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Roadrunner, LLC Hybrid", "city": "", "id": "254", "external_id": "62561", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Roadrunner Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "254", "external_id": "62561", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Roadrunner, LLC Hybrid", "external_id": "62561", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Roadrunner Solar, LLC", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2022-01", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "5", "entity id": "62047", "entity name": "Roadrunner Solar, LLC", "plant producer type": "IPP", "plant name": "Roadrunner, LLC Hybrid", "plant state": "TX", "plant id": "62561", "generator id": "BA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62561", "date": "2022-05", "mw": 50}, "first_month": "2021-06", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2023-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "62047", "entity name": "Roadrunner Solar, LLC", "plant producer type": "IPP", "plant name": "Roadrunner, LLC Hybrid", "plant state": "TX", "plant id": "62561", "generator id": "BA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62561", "date": "2023-07", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2021-06", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2022-01", "start_operation": "2023-07", "start_estimated": "2022-05", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Roadrunner, LLC Hybrid", "name_short": "Roadrunner", "owner": "Roadrunner Solar, LLC", "state": "texas", "country": "usa", "lat": "33.27525537493651", "long": "-95.3315331949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.27525537493651+-95.3315331949425", "construction_time_month": 18, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dollymans Storage", "city": "", "id": "335", "external_id": "7088", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Statera Energy / Dollymans Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "335", "external_id": "7088", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dollymans Storage", "external_id": "7088", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Statera Energy / Dollymans Storage", "status": "operation", "date_first_heard": "2021-11-05", "start_construction": "", "start_operation": "2023-07-01", "start_estimated": "", "month_disappeared": "", "lat": "51.593684", "long": "0.563833", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7088", "Record Last Updated (dd/mm/yyyy)": "28/05/2021", "Operator (or Applicant)": "Statera Energy / Dollymans Storage", "Site Name": "Dollymans Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.98", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS11 8UD", "X-coordinate": "577686", "Y-coordinate": "191429", "Planning Authority": "Rochford District Council", "Planning Application Reference": "21/00522/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.593684", "long": "0.563833", "status": "planning", "mw": 99, "ext_id": "7088"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "05/11/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Address", "from": "Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, Essex", "to": "Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, ", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "05/11/2023", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/05/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "28/05/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/07/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7088", "Record Last Updated (dd/mm/yyyy)": "28/05/2021", "Operator (or Applicant)": "Statera Energy / Dollymans Storage", "Site Name": "Dollymans Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.98", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS11 8UD", "X-coordinate": "577686", "Y-coordinate": "191429", "Planning Authority": "Rochford District Council", "Planning Application Reference": "21/00522/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/11/2023", "Under Construction": "", "Operational": "01/07/2023", "Heat Network Ref": "", "lat": "51.593684", "long": "0.563833", "status": "operation", "mw": 99, "ext_id": "7088"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-28", "start_construction": "", "start_operation": "2021-05-28"}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11-05", "start_construction": "", "start_operation": "2023-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Dollymans Storage", "name_short": "Dollymans", "owner": "Statera Energy / Dollymans Storage", "state": "eastern", "country": "uk", "lat": "51.593684", "long": "0.563833", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.593684+0.563833", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Roseland Solar Project, LLC", "city": "", "id": "629", "external_id": "65028", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "118", "power_mw": "59", "customer": "", "owner": "Enel Green Power Roseland Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "629", "external_id": "65028", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Roseland Solar Project, LLC", "external_id": "65028", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 118, "power_mw": 59, "owner": "Enel Green Power Roseland Solar, LLC", "status": "operation", "date_first_heard": "2022-03", "start_construction": "2022-08", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ROSEB": {"first": {"year": "2022", "month": "11", "entity id": "64438", "entity name": "Enel Green Power Roseland Solar, LLC", "plant producer type": "IPP", "plant name": "Roseland Solar Project, LLC", "plant state": "TX", "plant id": "65028", "generator id": "ROSEB", "net summer capacity (mw)": "59.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65028", "date": "2022-11", "mw": 59}, "first_month": "2022-03", "changes": [{"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "64438", "entity name": "Enel Green Power Roseland Solar, LLC", "plant producer type": "IPP", "plant name": "Roseland Solar Project, LLC", "plant state": "TX", "plant id": "65028", "generator id": "ROSEB", "net summer capacity (mw)": "59.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65028", "date": "2023-07", "mw": 59}, "current_month": "2024-02", "dates": {"first_heard": "2022-03", "start_construction": "2022-08"}, "month_disappeared": ""}}, "mw": 59, "mwh_is_estimate": true, "mwh": 118, "mwh_estimate": 118, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-03", "start_construction": "2022-08", "start_operation": "2023-07", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Roseland Solar Project, LLC", "name_short": "Roseland Solar Project", "owner": "Enel Green Power Roseland Solar, LLC", "state": "texas", "country": "usa", "lat": "33.527600044661234", "long": "-95.49978945087824", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.527600044661234+-95.49978945087824", "construction_time_month": 11, "construction_speed_mwh_per_month": 10, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn S4", "city": "", "id": "710", "external_id": "65677", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "710", "external_id": "65677", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn S4", "external_id": "65677", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 36, "power_mw": 18, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S4", "plant state": "CA", "plant id": "65677", "generator id": "BESS", "net summer capacity (mw)": "20.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65677", "date": "2022-12", "mw": 20}, "first_month": "2022-06", "changes": [{"month": "2022-10", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 20, "to": 18, "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S4", "plant state": "CA", "plant id": "65677", "generator id": "BESS", "net summer capacity (mw)": "18.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65677", "date": "2023-07", "mw": 18}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 18, "mwh_is_estimate": true, "mwh": 36, "mwh_estimate": 36, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Edwards Sanborn S4", "name_short": "Edwards Sanborn S4", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.320049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.320049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX19 River Valley Storage 1", "city": "", "id": "724", "external_id": "65699", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "724", "external_id": "65699", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX19 River Valley Storage 1", "external_id": "65699", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX19": {"first": {"year": "2022", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX19 River Valley Storage 1", "plant state": "TX", "plant id": "65699", "generator id": "TX19", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65699", "date": "2022-12", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX19 River Valley Storage 1", "plant state": "TX", "plant id": "65699", "generator id": "TX19", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65699", "date": "2023-07", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "TX19 River Valley Storage 1", "name_short": "TX19 River Valley Storage 1", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.57578923408578", "long": "-95.23388382472001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.57578923408578+-95.23388382472001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX21 River Valley Storage 2", "city": "", "id": "725", "external_id": "65700", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "725", "external_id": "65700", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX21 River Valley Storage 2", "external_id": "65700", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX21": {"first": {"year": "2022", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX21 River Valley Storage 2", "plant state": "TX", "plant id": "65700", "generator id": "TX21", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65700", "date": "2022-12", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX21 River Valley Storage 2", "plant state": "TX", "plant id": "65700", "generator id": "TX21", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65700", "date": "2023-07", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "TX21 River Valley Storage 2", "name_short": "TX21 River Valley Storage 2", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.604054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.604054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mesquite Solar 5, LLC", "city": "", "id": "772", "external_id": "65963", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "772", "external_id": "65963", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mesquite Solar 5, LLC", "external_id": "65963", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Consolidated Edison Development Inc.", "status": "operation", "date_first_heard": "2022-10", "start_construction": "2022-11", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MS5B": {"first": {"year": "2023", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Mesquite Solar 5, LLC", "plant state": "AZ", "plant id": "65963", "generator id": "MS5B", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65963", "date": "2023-06", "mw": 60}, "first_month": "2022-10", "changes": [{"month": "2022-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2023-07", "extra": "accelerated by 5 months", "change_type": "timing"}]}], "current": {"year": "2023", "month": "7", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Mesquite Solar 5, LLC", "plant state": "AZ", "plant id": "65963", "generator id": "MS5B", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65963", "date": "2023-07", "mw": 60}, "current_month": "2024-02", "dates": {"first_heard": "2022-10", "start_construction": "2022-11"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-10", "start_construction": "2022-11", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Mesquite Solar 5, LLC", "name_short": "Mesquite Solar 5", "owner": "Consolidated Edison Development Inc.", "state": "arizona", "country": "usa", "lat": "36.37027651357818", "long": "-110.034113126965", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.37027651357818+-110.034113126965", "construction_time_month": 8, "construction_speed_mwh_per_month": 15, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Peak Energy Storage I", "city": "", "id": "853", "external_id": "65987", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "650", "power_mw": "325", "customer": "", "owner": "Desert Peak Energy Storage I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "853", "external_id": "65987", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Peak Energy Storage I", "external_id": "65987", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 650, "power_mw": 325, "owner": "Desert Peak Energy Storage I, LLC", "status": "operation", "date_first_heard": "2022-11", "start_construction": "2023-03", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DP1": {"first": {"year": "2023", "month": "6", "entity id": "65168", "entity name": "Desert Peak Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Desert Peak Energy Storage I", "plant state": "CA", "plant id": "65987", "generator id": "DP1", "net summer capacity (mw)": "325", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65987", "date": "2023-06", "mw": 325}, "first_month": "2022-11", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65168", "entity name": "Desert Peak Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Desert Peak Energy Storage I", "plant state": "CA", "plant id": "65987", "generator id": "DP1", "net summer capacity (mw)": "325", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65987", "date": "2023-07", "mw": 325}, "current_month": "2024-02", "dates": {"first_heard": "2022-11", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 325, "mwh_is_estimate": true, "mwh": 650, "mwh_estimate": 650, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "2023-03", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Desert Peak Energy Storage I", "name_short": "Desert Peak Energy Storage I", "owner": "Desert Peak Energy Storage I, LLC", "state": "california", "country": "usa", "lat": "40.98838017893376", "long": "-121.39762135188055", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98838017893376+-121.39762135188055", "construction_time_month": 4, "construction_speed_mwh_per_month": 162, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Peak Energy Storage II", "city": "", "id": "856", "external_id": "65988", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Desert Peak Energy Storage II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "856", "external_id": "65988", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Peak Energy Storage II", "external_id": "65988", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Desert Peak Energy Storage II, LLC", "status": "operation", "date_first_heard": "2022-11", "start_construction": "2023-03", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DP2": {"first": {"year": "2023", "month": "6", "entity id": "65169", "entity name": "Desert Peak Energy Storage II, LLC", "plant producer type": "IPP", "plant name": "Desert Peak Energy Storage II", "plant state": "CA", "plant id": "65988", "generator id": "DP2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65988", "date": "2023-06", "mw": 75}, "first_month": "2022-11", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65169", "entity name": "Desert Peak Energy Storage II, LLC", "plant producer type": "IPP", "plant name": "Desert Peak Energy Storage II", "plant state": "CA", "plant id": "65988", "generator id": "DP2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65988", "date": "2023-07", "mw": 75}, "current_month": "2024-02", "dates": {"first_heard": "2022-11", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "2023-03", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Desert Peak Energy Storage II", "name_short": "Desert Peak Energy Storage II", "owner": "Desert Peak Energy Storage II, LLC", "state": "california", "country": "usa", "lat": "40.902031888219526", "long": "-121.22835705730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.902031888219526+-121.22835705730502", "construction_time_month": 4, "construction_speed_mwh_per_month": 37, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jicarilla Solar 1 LLC", "city": "", "id": "937", "external_id": "66163", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Repsol Renewables NA", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "937", "external_id": "66163", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Jicarilla Solar 1 LLC", "external_id": "66163", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Repsol Renewables NA", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"JICB1": {"first": {"year": "2023", "month": "3", "entity id": "65265", "entity name": "Repsol Renewables NA", "plant producer type": "IPP", "plant name": "Jicarilla Solar 1 LLC", "plant state": "NM", "plant id": "66163", "generator id": "JICB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66163", "date": "2023-03", "mw": 20}, "first_month": "2023-02", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65265", "entity name": "Repsol Renewables NA", "plant producer type": "IPP", "plant name": "Jicarilla Solar 1 LLC", "plant state": "NM", "plant id": "66163", "generator id": "JICB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66163", "date": "2023-07", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2023-03", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Jicarilla Solar 1 LLC", "name_short": "Jicarilla Solar 1", "owner": "Repsol Renewables NA", "state": "new mexico", "country": "usa", "lat": "36.27673136320376", "long": "-103.5521929560094", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.27673136320376+-103.5521929560094", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yellow Pine Solar", "city": "", "id": "975", "external_id": "66357", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "96", "power_mw": "48", "customer": "", "owner": "Yellow Pine Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "975", "external_id": "66357", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Yellow Pine Solar", "external_id": "66357", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 96, "power_mw": 48, "owner": "Yellow Pine Solar, LLC", "status": "operation", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"YPES": {"first": {"year": "2023", "month": "6", "entity id": "65453", "entity name": "Yellow Pine Solar, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine Solar", "plant state": "NV", "plant id": "66357", "generator id": "YPES", "net summer capacity (mw)": "26.7", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66357", "date": "2023-06", "mw": 26}, "first_month": "2023-03", "changes": [{"month": "2023-05", "li": [{"name": "mw", "from": 26, "to": 48, "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65453", "entity name": "Yellow Pine Solar, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine Solar", "plant state": "NV", "plant id": "66357", "generator id": "YPES", "net summer capacity (mw)": "48.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66357", "date": "2023-07", "mw": 48}, "current_month": "2024-02", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 48, "mwh_is_estimate": true, "mwh": 96, "mwh_estimate": 96, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Yellow Pine Solar", "name_short": "Yellow Pine Solar", "owner": "Yellow Pine Solar, LLC", "state": "nevada", "country": "usa", "lat": "41.293396", "long": "-114.906006", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.293396+-114.906006", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wolf Tank Storage", "city": "", "id": "1028", "external_id": "66616", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Wolf Tank Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1028", "external_id": "66616", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wolf Tank Storage", "external_id": "66616", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Wolf Tank Storage LLC", "status": "operation", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "5", "entity id": "65642", "entity name": "Wolf Tank Storage LLC", "plant producer type": "IPP", "plant name": "Wolf Tank Storage", "plant state": "TX", "plant id": "66616", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66616", "date": "2023-05", "mw": 150}, "first_month": "2023-06", "changes": [{"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65642", "entity name": "Wolf Tank Storage LLC", "plant producer type": "IPP", "plant name": "Wolf Tank Storage", "plant state": "TX", "plant id": "66616", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66616", "date": "2023-07", "mw": 150}, "current_month": "2024-02", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Wolf Tank Storage", "name_short": "Wolf Tank", "owner": "Wolf Tank Storage LLC", "state": "texas", "country": "usa", "lat": "33.58101561449517", "long": "-95.448185670785", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.58101561449517+-95.448185670785", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gigafactory Texas", "city": "", "id": "1176", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "125", "customer": "", "owner": "Tesla", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "68", "status": "operation", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.230756", "long": "-97.615973", "coords_hint": "1", "use_case": "", "notes": "used date of tweet for the operation start date", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1681503667030212608", "link2": "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "link3": "https://twitter.com/SawyerMerritt/status/1682834256928571392", "link4": "https://x.com/Tesla_Megapack/status/1791530954261172681"}, "internal_id": "1176", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 125, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Gigafactory Texas", "name_short": "Gigafactory Texas", "owner": "Tesla", "state": "texas", "country": "usa", "lat": "30.230756", "long": "-97.615973", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.230756+-97.615973", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 68, "notes_split": ["used date of tweet for the operation start date"], "links": ["https://twitter.com/Tesla_Megapack/status/1681503667030212608", "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "https://twitter.com/SawyerMerritt/status/1682834256928571392", "https://x.com/Tesla_Megapack/status/1791530954261172681"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Moss Landing", "city": "Moss Landing", "id": "37", "external_id": "260", "state": "california", "country": "usa", "capacity_mwh": "1600", "estimate_mwh": "", "power_mw": "400", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "LG", "type": "", "cells": "LG", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-02-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.806072", "long": "-121.782258", "coords_hint": "1", "use_case": "", "notes": "TR1200 rack design with JH4 cell, 4500+ racks, two stages here ** incident: septemter 2021 the first phase 1200 MWh was shut down after an overheating triggered the sprinkler system. ", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://www.energy-storage.news/manufacturer-reveals-involvement-in-worlds-biggest-battery-energy-storage-system-so-far/", "link2": "https://insideevs.com/news/489894/vistra-moss-landing-energy-storage-world-largest/", "link3": "https://reneweconomy.com.au/worlds-biggest-battery-sidelined-after-overheating-incident-in-california/", "link4": ""}, "internal_id": "37", "external_id": "260", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dynegy Moss Landing Power Plant Hybrid", "external_id": "260", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 1500, "power_mw": 750, "owner": "Dynegy -Moss Landing LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-09", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BAT1": {"first": {"year": "2020", "month": "12", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "260", "date": "2020-12", "mw": 300}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "date", "from": "2020-12", "to": "2021-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "date", "from": "2021-03", "to": "2021-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-06", "to": "2021-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "5", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "260", "date": "2021-05", "mw": 300}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}, "BAT2": {"first": {"year": "2021", "month": "5", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "260", "date": "2021-05", "mw": 100}, "first_month": "2021-11", "changes": [], "current": {"year": "2021", "month": "5", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "260", "date": "2021-05", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}, "BAT3": {"first": {"year": "2023", "month": "6", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT3", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "260", "date": "2023-06", "mw": 350}, "first_month": "2022-04", "changes": [{"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT3", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "260", "date": "2023-06", "mw": 350}, "current_month": "2024-02", "dates": {"first_heard": "2022-04", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 750, "mwh_is_estimate": false, "mwh": 1600, "mwh_estimate": 1500, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-09", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Dynegy Moss Landing Power Plant Hybrid", "name_short": "Dynegy Moss Landing Power Plant", "owner": "Dynegy -Moss Landing LLC", "state": "california", "country": "usa", "lat": "36.806072", "long": "-121.782258", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.806072+-121.782258", "construction_time_month": 9, "construction_speed_mwh_per_month": 177, "no_of_battery_units": 0, "notes_split": ["TR1200 rack design with JH4 cell, 4500+ racks, two stages here ", " incident: septemter 2021 the first phase 1200 MWh was shut down after an overheating triggered the sprinkler system. "], "links": ["https://www.energy-storage.news/manufacturer-reveals-involvement-in-worlds-biggest-battery-energy-storage-system-so-far/", "https://insideevs.com/news/489894/vistra-moss-landing-energy-storage-world-largest/", "https://reneweconomy.com.au/worlds-biggest-battery-sidelined-after-overheating-incident-in-california/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chapel Farm", "city": "Luton", "id": "129", "external_id": "7058", "state": "bedfordshire", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Tag Energy", "developer": "Harmony Energy", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "51.925835", "long": "-0.49999903", "coords_hint": "0", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://twitter.com/Tesla_Megapack/status/1669479285848182784", "link3": "", "link4": ""}, "internal_id": "129", "external_id": "7058", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chapel Farm", "external_id": "7058", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy", "status": "planning", "date_first_heard": "2019-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.925834", "long": "-0.499999", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7058", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Chapel Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ ", "X-coordinate": "503243", "Y-coordinate": "226320", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/18/01795/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.925834", "long": "-0.499999", "status": "planning", "mw": 49, "ext_id": "7058"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "13/06/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7058", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Chapel Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ ", "X-coordinate": "503243", "Y-coordinate": "226320", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/18/01795/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.925834", "long": "-0.499999", "status": "planning", "mw": 49, "ext_id": "7058"}, "current_month": "2024-01", "dates": {"first_heard": "2019-06-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 99, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-01-18", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Chapel Farm", "name_short": "Chapel Farm", "owner": "Harmony Energy", "state": "eastern", "country": "uk", "lat": "51.925834", "long": "-0.499999", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.925834+-0.499999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article"], "links": ["https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "https://twitter.com/Tesla_Megapack/status/1669479285848182784"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Neptune Energy Center Hybrid", "city": "", "id": "204", "external_id": "63731", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "Neptune Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "204", "external_id": "63731", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Neptune Energy Center Hybrid", "external_id": "63731", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "Neptune Energy Center, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NT125": {"first": {"year": "2022", "month": "12", "entity id": "63427", "entity name": "Neptune Energy Center, LLC", "plant producer type": "IPP", "plant name": "Neptune Energy Center Hybrid", "plant state": "CO", "plant id": "63731", "generator id": "NT125", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63731", "date": "2022-12", "mw": 125}, "first_month": "2020-09", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "63427", "entity name": "Neptune Energy Center, LLC", "plant producer type": "IPP", "plant name": "Neptune Energy Center Hybrid", "plant state": "CO", "plant id": "63731", "generator id": "NT125", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63731", "date": "2023-06", "mw": 125}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-02"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "2023-06", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Neptune Energy Center Hybrid", "name_short": "Neptune Energy Center", "owner": "Neptune Energy Center, LLC", "state": "colorado", "country": "usa", "lat": "40.716268973433976", "long": "-102.689481504495", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.716268973433976+-102.689481504495", "construction_time_month": 16, "construction_speed_mwh_per_month": 15, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thunder Wolf Energy Center Hybrid", "city": "", "id": "205", "external_id": "63776", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Thunder Wolf Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "205", "external_id": "63776", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Thunder Wolf Energy Center Hybrid", "external_id": "63776", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Thunder Wolf Energy Center, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TW100": {"first": {"year": "2022", "month": "12", "entity id": "63454", "entity name": "Thunder Wolf Energy Center, LLC", "plant producer type": "IPP", "plant name": "Thunder Wolf Energy Center Hybrid", "plant state": "CO", "plant id": "63776", "generator id": "TW100", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63776", "date": "2022-12", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-05", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "63454", "entity name": "Thunder Wolf Energy Center, LLC", "plant producer type": "IPP", "plant name": "Thunder Wolf Energy Center Hybrid", "plant state": "CO", "plant id": "63776", "generator id": "TW100", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63776", "date": "2023-06", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-02"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "2023-06", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Thunder Wolf Energy Center Hybrid", "name_short": "Thunder Wolf Energy Center", "owner": "Thunder Wolf Energy Center, LLC", "state": "colorado", "country": "usa", "lat": "40.742576", "long": "-102.716675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.742576+-102.716675", "construction_time_month": 16, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blue Jay Solar I, LLC", "city": "", "id": "241", "external_id": "64672", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "420", "power_mw": "210", "customer": "", "owner": "Blue Jay Solar I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "241", "external_id": "64672", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blue Jay Solar I, LLC", "external_id": "64672", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 420, "power_mw": 210, "owner": "Blue Jay Solar I, LLC", "status": "operation", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BLUJS": {"first": {"year": "2021", "month": "12", "entity id": "64266", "entity name": "Blue Jay Solar I, LLC", "plant producer type": "IPP", "plant name": "Blue Jay Solar I, LLC", "plant state": "TX", "plant id": "64672", "generator id": "BLUJS", "net summer capacity (mw)": "210", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64672", "date": "2021-12", "mw": 210}, "first_month": "2021-06", "changes": [{"month": "2021-07", "li": [{"name": "mw", "from": 210, "to": 50, "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "mw", "from": 50, "to": 210, "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "64266", "entity name": "Blue Jay Solar I, LLC", "plant producer type": "IPP", "plant name": "Blue Jay Solar I, LLC", "plant state": "TX", "plant id": "64672", "generator id": "BLUJS", "net summer capacity (mw)": "210", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64672", "date": "2023-06", "mw": 210}, "current_month": "2024-02", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 210, "mwh_is_estimate": true, "mwh": 420, "mwh_estimate": 420, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "2023-06", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Blue Jay Solar I, LLC", "name_short": "Blue Jay Solar I", "owner": "Blue Jay Solar I, LLC", "state": "texas", "country": "usa", "lat": "33.48557373342624", "long": "-95.17643023533789", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.48557373342624+-95.17643023533789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "High Lonesome Wind Power, LLC Hybrid", "city": "", "id": "253", "external_id": "62562", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "High Lonesome Wind Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "253", "external_id": "62562", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "High Lonesome Wind Power, LLC Hybrid", "external_id": "62562", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "High Lonesome Wind Power, LLC", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2022-01", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "5", "entity id": "62046", "entity name": "High Lonesome Wind Power, LLC", "plant producer type": "IPP", "plant name": "High Lonesome Wind Power, LLC Hybrid", "plant state": "TX", "plant id": "62562", "generator id": "BA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62562", "date": "2022-05", "mw": 50}, "first_month": "2021-06", "changes": [{"month": "2021-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2023-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "62046", "entity name": "High Lonesome Wind Power, LLC", "plant producer type": "IPP", "plant name": "High Lonesome Wind Power, LLC Hybrid", "plant state": "TX", "plant id": "62562", "generator id": "BA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62562", "date": "2023-06", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2021-06", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2022-01", "start_operation": "2023-06", "start_estimated": "2022-07", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "High Lonesome Wind Power, LLC Hybrid", "name_short": "High Lonesome Wind Power", "owner": "High Lonesome Wind Power, LLC", "state": "texas", "country": "usa", "lat": "33.319757178933756", "long": "-95.37101035188054", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.319757178933756+-95.37101035188054", "construction_time_month": 17, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Feeder Road", "city": "", "id": "405", "external_id": "7663", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Thrive Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "405", "external_id": "7663", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Feeder Road", "external_id": "7663", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Thrive Renewables", "status": "operation", "date_first_heard": "2020-05-27", "start_construction": "2023-01-01", "start_operation": "2023-06-13", "start_estimated": "", "month_disappeared": "", "lat": "51.447495", "long": "-2.565063", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7663", "Record Last Updated (dd/mm/yyyy)": "21/05/2021", "Operator (or Applicant)": "Thrive Renewables", "Site Name": "Feeder Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Adjacent To St Philip's Marsh, Feeder Road, Land Off, Bristol, Avon", "County": "Avon", "Region": "South West", "Country": "England", "Post Code": "BS2 0TH", "X-coordinate": "360828", "Y-coordinate": "172208", "Planning Authority": "Bristol City Council", "Planning Application Reference": "19/04841/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/05/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.447495", "long": "-2.565063", "status": "planning", "mw": 20, "ext_id": "7663"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/05/2021", "to": "20/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/05/2022", "to": "13/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Finished", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Finished", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2023", "to": "01/05/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7663", "Record Last Updated (dd/mm/yyyy)": "01/05/2023", "Operator (or Applicant)": "Thrive Renewables", "Site Name": "Feeder Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Finished", "Development Status (short)": "Finished", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To St Philip's Marsh, Feeder Road, Land Off, Bristol, Avon", "County": "Avon", "Region": "South West", "Country": "England", "Post Code": "BS2 0TH", "X-coordinate": "360828", "Y-coordinate": "172208", "Planning Authority": "Bristol City Council", "Planning Application Reference": "19/04841/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/05/2023", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "51.447495", "long": "-2.565063", "status": "operation", "mw": 20, "ext_id": "7663"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-21", "start_construction": "", "start_operation": "2023-06-13"}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-05-27", "start_construction": "2023-01-01", "start_operation": "2023-06-13", "start_estimated": "", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Feeder Road", "name_short": "Feeder Road", "owner": "Thrive Renewables", "state": "south west", "country": "uk", "lat": "51.447495", "long": "-2.565063", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.447495+-2.565063", "construction_time_month": 5, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Andover Energy Storage Project", "city": "", "id": "779", "external_id": "65952", "state": "new jersey", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI 25 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "779", "external_id": "65952", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Andover Energy Storage Project", "external_id": "65952", "state": "new jersey", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "VESI 25 LLC", "status": "operation", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AD1": {"first": {"year": "2022", "month": "10", "entity id": "65128", "entity name": "VESI 25 LLC", "plant producer type": "IPP", "plant name": "Andover Energy Storage Project", "plant state": "NJ", "plant id": "65952", "generator id": "AD1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65952", "date": "2022-10", "mw": 20}, "first_month": "2022-09", "changes": [{"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2023-02", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "65128", "entity name": "VESI 25 LLC", "plant producer type": "IPP", "plant name": "Andover Energy Storage Project", "plant state": "NJ", "plant id": "65952", "generator id": "AD1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65952", "date": "2023-06", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "2023-06", "start_estimated": "2022-10", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Andover Energy Storage Project", "name_short": "Andover", "owner": "VESI 25 LLC", "state": "new jersey", "country": "usa", "lat": "39.80695125590127", "long": "-73.98608089749223", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:39.80695125590127+-73.98608089749223", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "CED West Side Canal Battery Storage", "city": "", "id": "854", "external_id": "65980", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "262", "power_mw": "131", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "854", "external_id": "65980", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "CED West Side Canal Battery Storage", "external_id": "65980", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 262, "power_mw": 131, "owner": "Consolidated Edison Development Inc.", "status": "operation", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WCBS": {"first": {"year": "2023", "month": "2", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "CED West Side Canal Battery Storage", "plant state": "CA", "plant id": "65980", "generator id": "WCBS", "net summer capacity (mw)": "131", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65980", "date": "2023-02", "mw": 131}, "first_month": "2022-11", "changes": [{"month": "2023-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "CED West Side Canal Battery Storage", "plant state": "CA", "plant id": "65980", "generator id": "WCBS", "net summer capacity (mw)": "131", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65980", "date": "2023-06", "mw": 131}, "current_month": "2024-02", "dates": {"first_heard": "2022-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 131, "mwh_is_estimate": true, "mwh": 262, "mwh_estimate": 262, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2023-06", "start_estimated": "2023-02", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "CED West Side Canal Battery Storage", "name_short": "CED West Side Canal", "owner": "Consolidated Edison Development Inc.", "state": "california", "country": "usa", "lat": "40.94387837493652", "long": "-121.3581441949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94387837493652+-121.3581441949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Buena Vista Energy Center", "city": "", "id": "974", "external_id": "66408", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Buena Vista Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "974", "external_id": "66408", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Buena Vista Energy Center", "external_id": "66408", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Buena Vista Energy Center, LLC", "status": "operation", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2023", "month": "6", "entity id": "65486", "entity name": "Buena Vista Energy Center, LLC", "plant producer type": "IPP", "plant name": "Buena Vista Energy Center", "plant state": "NM", "plant id": "66408", "generator id": "BESS1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66408", "date": "2023-06", "mw": 50}, "first_month": "2023-04", "changes": [{"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-07", "to": "2023-06", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "6", "entity id": "65486", "entity name": "Buena Vista Energy Center, LLC", "plant producer type": "IPP", "plant name": "Buena Vista Energy Center", "plant state": "NM", "plant id": "66408", "generator id": "BESS1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66408", "date": "2023-06", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2023-04", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2023-06", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Buena Vista Energy Center", "name_short": "Buena Vista", "owner": "Buena Vista Energy Center, LLC", "state": "new mexico", "country": "usa", "lat": "36.233020114284706", "long": "-103.74843487471747", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.233020114284706+-103.74843487471747", "construction_time_month": -1, "construction_speed_mwh_per_month": -100, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upton County BESS", "city": "", "id": "1065", "external_id": "64811", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "24", "customer": "", "owner": "VESI Upton County BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1065", "external_id": "64811", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Upton County BESS", "external_id": "64811", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 48, "power_mw": 24, "owner": "VESI Upton County BESS, LLC", "status": "operation", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UPT1": {"first": {"year": "2023", "month": "6", "entity id": "64339", "entity name": "VESI Upton County BESS, LLC", "plant producer type": "IPP", "plant name": "Upton County BESS", "plant state": "TX", "plant id": "64811", "generator id": "UPT1", "net summer capacity (mw)": "24.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64811", "date": "2023-06", "mw": 24}, "first_month": "2023-08", "changes": [], "current": {"year": "2023", "month": "6", "entity id": "64339", "entity name": "VESI Upton County BESS, LLC", "plant producer type": "IPP", "plant name": "Upton County BESS", "plant state": "TX", "plant id": "64811", "generator id": "UPT1", "net summer capacity (mw)": "24.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64811", "date": "2023-06", "mw": 24}, "current_month": "2024-02", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 24, "mwh_is_estimate": true, "mwh": 48, "mwh_estimate": 48, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Upton County BESS", "name_short": "Upton County", "owner": "VESI Upton County BESS, LLC", "state": "texas", "country": "usa", "lat": "33.684053999999996", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.684053999999996+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dunsinane Industrial Estate", "city": "", "id": "398", "external_id": "7591", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "398", "external_id": "7591", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dunsinane Industrial Estate", "external_id": "7591", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "JLEN Environmental Assets Group", "status": "operation", "date_first_heard": "2020-03-27", "start_construction": "", "start_operation": "2023-05-03", "start_estimated": "", "month_disappeared": "", "lat": "56.480316", "long": "-3.012355", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7591", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Gigabox Developments", "Site Name": "Dunsinane Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To The W/O Kinnoull Stree, Dunsinane Avenue, Dunsinane Industrial Estate, Dundee, Tayside", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 3QT", "X-coordinate": "337745", "Y-coordinate": "732482", "Planning Authority": "Dundee City Council", "Planning Application Reference": "19/00876/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.480316", "long": "-3.012355", "status": "planning", "mw": 49, "ext_id": "7591"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "16/05/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Gigabox Developments", "to": "JLEN Environmental Assets Group", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "27/03/2023", "to": "08/12/2023", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "03/05/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7591", "Record Last Updated (dd/mm/yyyy)": "16/05/2023", "Operator (or Applicant)": "JLEN Environmental Assets Group", "Site Name": "Dunsinane Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The W/O Kinnoull Stree, Dunsinane Avenue, Dunsinane Industrial Estate, Dundee, Tayside", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 3QT", "X-coordinate": "337745", "Y-coordinate": "732482", "Planning Authority": "Dundee City Council", "Planning Application Reference": "19/00876/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/12/2023", "Under Construction": "", "Operational": "03/05/2023", "Heat Network Ref": "", "lat": "56.480316", "long": "-3.012355", "status": "operation", "mw": 49, "ext_id": "7591"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": "2023-05-16"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-03-27", "start_construction": "", "start_operation": "2023-05-03", "start_estimated": "", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Dunsinane Industrial Estate", "name_short": "Dunsinane Industrial Estate", "owner": "JLEN Environmental Assets Group", "state": "scotland", "country": "uk", "lat": "56.480316", "long": "-3.012355", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.480316+-3.012355", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "NY6 Battery", "city": "", "id": "714", "external_id": "65692", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "714", "external_id": "65692", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "NY6 Battery", "external_id": "65692", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-08", "start_construction": "", "start_operation": "2023-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NY6": {"first": {"year": "2022", "month": "11", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "NY6 Battery", "plant state": "NY", "plant id": "65692", "generator id": "NY6", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65692", "date": "2022-11", "mw": 20}, "first_month": "2022-08", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-02", "to": "2023-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "5", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "NY6 Battery", "plant state": "NY", "plant id": "65692", "generator id": "NY6", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65692", "date": "2023-05", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2022-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "NY6 Battery", "name_short": "NY6 Battery", "owner": "Key Capture Energy", "state": "new york", "country": "usa", "lat": "42.54929289624012", "long": "-75.5369138353925", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.54929289624012+-75.5369138353925", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sagebrush ESS", "city": "", "id": "776", "external_id": "65933", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Sagebrush ESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "776", "external_id": "65933", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sagebrush ESS", "external_id": "65933", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "Terra-Gen Operating Co-BESS 2", "status": "operation", "date_first_heard": "2022-09", "start_construction": "2022-11", "start_operation": "2023-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "1", "entity id": "65106", "entity name": "Sagebrush ESS, LLC", "plant producer type": "IPP", "plant name": "Sagebrush ESS", "plant state": "CA", "plant id": "65933", "generator id": "1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65933", "date": "2023-01", "mw": 80}, "first_month": "2022-09", "changes": [{"month": "2022-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "entity id", "from": "65106", "to": "64287", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Sagebrush ESS, LLC", "to": "Terra-Gen Operating Co-BESS", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "entity id", "from": "64287", "to": "65552", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Terra-Gen Operating Co-BESS", "to": "Terra-Gen Operating Co-BESS 2", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "5", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush ESS", "plant state": "CA", "plant id": "65933", "generator id": "1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65933", "date": "2023-05", "mw": 80}, "current_month": "2024-02", "dates": {"first_heard": "2022-09", "start_construction": "2022-11"}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09", "start_construction": "2022-11", "start_operation": "2023-05", "start_estimated": "2023-01", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Sagebrush ESS", "name_short": "Sagebrush ESS", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "40.86398962756772", "long": "-121.21599637753002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.86398962756772+-121.21599637753002", "construction_time_month": 6, "construction_speed_mwh_per_month": 26, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bowling Green Energy Storage Project", "city": "", "id": "781", "external_id": "65951", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "VESI 21 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "781", "external_id": "65951", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bowling Green Energy Storage Project", "external_id": "65951", "state": "ohio", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "VESI 21 LLC", "status": "operation", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "2023-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BG1": {"first": {"year": "2022", "month": "10", "entity id": "65129", "entity name": "VESI 21 LLC", "plant producer type": "IPP", "plant name": "Bowling Green Energy Storage Project", "plant state": "OH", "plant id": "65951", "generator id": "BG1", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65951", "date": "2022-10", "mw": 12}, "first_month": "2022-09", "changes": [{"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2023-02", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-02", "to": "2023-01", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "5", "entity id": "65129", "entity name": "VESI 21 LLC", "plant producer type": "IPP", "plant name": "Bowling Green Energy Storage Project", "plant state": "OH", "plant id": "65951", "generator id": "BG1", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65951", "date": "2023-05", "mw": 12}, "current_month": "2024-02", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2022-10", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Bowling Green Energy Storage Project", "name_short": "Bowling Green", "owner": "VESI 21 LLC", "state": "ohio", "country": "usa", "lat": "41.44479209297624", "long": "-80.98205271403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.44479209297624+-80.98205271403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Farnham", "city": "Farnham", "id": "847", "external_id": "", "state": "surrey", "country": "uk", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.18894", "long": "-0.82903032", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "link3": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/", "link4": ""}, "internal_id": "847", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Farnham", "name_short": "Farnham", "owner": "Harmony Energy Income Trust", "state": "surrey", "country": "uk", "lat": "51.18894", "long": "-0.82903032", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.18894+-0.82903032", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "California Flats", "city": "monterey county", "id": "4", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "130", "customer": "Apple", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "85", "status": "operation", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.87009", "long": "-120.326403", "coords_hint": "1", "use_case": "130MW solar farm support", "notes": "used the release date of the youtube video as the operation start date", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "link2": "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "link3": "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "link4": "https://www.youtube.com/watch?v=SA3SdlKBtyc"}, "internal_id": "4", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 130, "mwh_is_estimate": false, "mwh": 240, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "California Flats", "name_short": "California Flats", "owner": "", "state": "california", "country": "usa", "lat": "35.87009", "long": "-120.326403", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.87009+-120.326403", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 85, "notes_split": ["used the release date of the youtube video as the operation start date"], "links": ["https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "https://www.youtube.com/watch?v=SA3SdlKBtyc"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Foothills Solar Plant Hybrid", "city": "", "id": "147", "external_id": "57997", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "76", "power_mw": "38", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "147", "external_id": "57997", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Foothills Solar Plant Hybrid", "external_id": "57997", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 76, "power_mw": 38, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FH38M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Foothills Solar Plant Hybrid", "plant state": "AZ", "plant id": "57997", "generator id": "FH38M", "net summer capacity (mw)": "38", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57997", "date": "2021-12", "mw": 38}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Foothills Solar Plant Hybrid", "plant state": "AZ", "plant id": "57997", "generator id": "FH38M", "net summer capacity (mw)": "38", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57997", "date": "2023-04", "mw": 38}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 38, "mwh_is_estimate": true, "mwh": 76, "mwh_estimate": 76, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Foothills Solar Plant Hybrid", "name_short": "Foothills Solar Plant", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.66773897668374", "long": "-110.02279574903645", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.66773897668374+-110.02279574903645", "construction_time_month": 6, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gila Bend Hybrid", "city": "", "id": "148", "external_id": "59020", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "148", "external_id": "59020", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gila Bend Hybrid", "external_id": "59020", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 72, "power_mw": 36, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GB36M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Gila Bend Hybrid", "plant state": "AZ", "plant id": "59020", "generator id": "GB36M", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "59020", "date": "2021-12", "mw": 36}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Gila Bend Hybrid", "plant state": "AZ", "plant id": "59020", "generator id": "GB36M", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59020", "date": "2023-04", "mw": 36}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 36, "mwh_is_estimate": true, "mwh": 72, "mwh_estimate": 72, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Gila Bend Hybrid", "name_short": "Gila Bend", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.62890202458687", "long": "-110.09236235056", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.62890202458687+-110.09236235056", "construction_time_month": 6, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cotton Center Solar Hybrid", "city": "", "id": "151", "external_id": "57561", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "151", "external_id": "57561", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cotton Center Solar Hybrid", "external_id": "57561", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 34, "power_mw": 17, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CC17M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Cotton Center Solar Hybrid", "plant state": "AZ", "plant id": "57561", "generator id": "CC17M", "net summer capacity (mw)": "17", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57561", "date": "2021-12", "mw": 17}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Cotton Center Solar Hybrid", "plant state": "AZ", "plant id": "57561", "generator id": "CC17M", "net summer capacity (mw)": "17", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57561", "date": "2023-04", "mw": 17}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 17, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Cotton Center Solar Hybrid", "name_short": "Cotton Center Solar", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.440728926686255", "long": "-110.00128289498801", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.440728926686255+-110.00128289498801", "construction_time_month": 6, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Paloma Solar Hybrid", "city": "", "id": "152", "external_id": "57562", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "152", "external_id": "57562", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Paloma Solar Hybrid", "external_id": "57562", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 34, "power_mw": 17, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PA17M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Paloma Solar Hybrid", "plant state": "AZ", "plant id": "57562", "generator id": "PA17M", "net summer capacity (mw)": "17", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57562", "date": "2021-12", "mw": 17}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Paloma Solar Hybrid", "plant state": "AZ", "plant id": "57562", "generator id": "PA17M", "net summer capacity (mw)": "17", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57562", "date": "2023-04", "mw": 17}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 17, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Paloma Solar Hybrid", "name_short": "Paloma Solar", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.39378792366988", "long": "-110.00175244719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.39378792366988+-110.00175244719", "construction_time_month": 6, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hyder Solar Hybrid", "city": "", "id": "153", "external_id": "57563", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "16", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "153", "external_id": "57563", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hyder Solar Hybrid", "external_id": "57563", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 32, "power_mw": 16, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"H116M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Hyder Solar Hybrid", "plant state": "AZ", "plant id": "57563", "generator id": "H116M", "net summer capacity (mw)": "16", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57563", "date": "2021-12", "mw": 16}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Hyder Solar Hybrid", "plant state": "AZ", "plant id": "57563", "generator id": "H116M", "net summer capacity (mw)": "16", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57563", "date": "2023-04", "mw": 16}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 16, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Hyder Solar Hybrid", "name_short": "Hyder Solar", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.344132178933755", "long": "-109.98282635188055", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.344132178933755+-109.98282635188055", "construction_time_month": 6, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hyder II Hybrid", "city": "", "id": "154", "external_id": "58383", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "154", "external_id": "58383", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hyder II Hybrid", "external_id": "58383", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 28, "power_mw": 14, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"H214M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Hyder II Hybrid", "plant state": "AZ", "plant id": "58383", "generator id": "H214M", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58383", "date": "2021-12", "mw": 14}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Hyder II Hybrid", "plant state": "AZ", "plant id": "58383", "generator id": "H214M", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "58383", "date": "2023-04", "mw": 14}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 14, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Hyder II Hybrid", "name_short": "Hyder II", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.29963037493651", "long": "-109.9433491949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.29963037493651+-109.9433491949425", "construction_time_month": 6, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES Waikoloa Solar Hybrid", "city": "", "id": "213", "external_id": "63900", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "213", "external_id": "63900", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES Waikoloa Solar Hybrid", "external_id": "63900", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-08", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KLOAB": {"first": {"year": "2022", "month": "11", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Waikoloa Solar Hybrid", "plant state": "HI", "plant id": "63900", "generator id": "KLOAB", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63900", "date": "2022-11", "mw": 30}, "first_month": "2020-09", "changes": [{"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-11", "to": "2023-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Waikoloa Solar Hybrid", "plant state": "HI", "plant id": "63900", "generator id": "KLOAB", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63900", "date": "2023-04", "mw": 30}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-08"}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-08", "start_operation": "2023-04", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "AES Waikoloa Solar Hybrid", "name_short": "AES Waikoloa Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.542269538483755", "long": "-155.56408453169715", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.542269538483755+-155.56408453169715", "construction_time_month": 8, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fallbrook Energy Storage", "city": "", "id": "183", "external_id": "61365", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "183", "external_id": "61365", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Fallbrook Energy Storage", "external_id": "61365", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-02", "start_operation": "2023-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FBES": {"first": {"year": "2021", "month": "5", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Fallbrook Energy Storage", "plant state": "CA", "plant id": "61365", "generator id": "FBES", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61365", "date": "2021-05", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2021-05", "to": "2021-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-12", "to": "2022-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Fallbrook Energy Storage", "plant state": "CA", "plant id": "61365", "generator id": "FBES", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61365", "date": "2023-03", "mw": 40}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-02"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-02", "start_operation": "2023-03", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2023-03", "go_live_year_int": 2023, "name": "Fallbrook Energy Storage", "name_short": "Fallbrook", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.30551484072874", "long": "-121.1672095329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.30551484072874+-121.1672095329819", "construction_time_month": 25, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Madero Grid", "city": "", "id": "244", "external_id": "63757", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Madero Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "244", "external_id": "63757", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Madero Grid", "external_id": "63757", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Madero Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-05", "start_operation": "2023-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MAD01": {"first": {"year": "2021", "month": "7", "entity id": "63451", "entity name": "Madero Grid, LLC", "plant producer type": "IPP", "plant name": "Madero Grid", "plant state": "TX", "plant id": "63757", "generator id": "MAD01", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63757", "date": "2021-07", "mw": 200}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "date", "from": "2021-07", "to": "2021-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2020-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-01", "li": [{"name": "mw", "from": 200, "to": 100, "extra": "", "change_type": "misc"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2022-01", "to": "2022-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2022-06", "to": "2022-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "3", "entity id": "63451", "entity name": "Madero Grid, LLC", "plant producer type": "IPP", "plant name": "Madero Grid", "plant state": "TX", "plant id": "63757", "generator id": "MAD01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63757", "date": "2023-03", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-05"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-05", "start_operation": "2023-03", "start_estimated": "2022-04", "month_disappeared": "", "go_live": "2023-03", "go_live_year_int": 2023, "name": "Madero Grid", "name_short": "Madero Grid", "owner": "Madero Grid, LLC", "state": "texas", "country": "usa", "lat": "33.61383149473758", "long": "-95.22152314494501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.61383149473758+-95.22152314494501", "construction_time_month": 22, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ignacio Grid Energy Storage System", "city": "", "id": "247", "external_id": "64089", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Ignacio Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "247", "external_id": "64089", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ignacio Grid Energy Storage System", "external_id": "64089", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Ignacio Grid, LLC", "status": "operation", "date_first_heard": "2020-11", "start_construction": "2021-06", "start_operation": "2023-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"IGN01": {"first": {"year": "2021", "month": "6", "entity id": "63723", "entity name": "Ignacio Grid, LLC", "plant producer type": "IPP", "plant name": "Ignacio Grid Energy Storage System", "plant state": "TX", "plant id": "64089", "generator id": "IGN01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64089", "date": "2021-06", "mw": 100}, "first_month": "2020-11", "changes": [{"month": "2021-01", "li": [{"name": "date", "from": "2021-06", "to": "2022-01", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2022-03", "to": "2022-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "3", "entity id": "63723", "entity name": "Ignacio Grid, LLC", "plant producer type": "IPP", "plant name": "Ignacio Grid Energy Storage System", "plant state": "TX", "plant id": "64089", "generator id": "IGN01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64089", "date": "2023-03", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2020-11", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-11", "start_construction": "2021-06", "start_operation": "2023-03", "start_estimated": "2022-05", "month_disappeared": "", "go_live": "2023-03", "go_live_year_int": 2023, "name": "Ignacio Grid Energy Storage System", "name_short": "Ignacio Grid", "owner": "Ignacio Grid, LLC", "state": "texas", "country": "usa", "lat": "33.64336397668374", "long": "-95.41097974903644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.64336397668374+-95.41097974903644", "construction_time_month": 21, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Camp Lejeune Solar and Energy Storage", "city": "", "id": "858", "external_id": "59966", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Duke Energy Progress - (NC)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "858", "external_id": "59966", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Camp Lejeune Solar and Energy Storage", "external_id": "59966", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "Duke Energy Progress - (NC)", "status": "operation", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2023-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ES1": {"first": {"year": "2023", "month": "3", "entity id": "3046", "entity name": "Duke Energy Progress - (NC)", "plant producer type": "Electric Utility", "plant name": "Camp Lejeune Solar and Energy Storage", "plant state": "NC", "plant id": "59966", "generator id": "ES1", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "59966", "date": "2023-03", "mw": 11}, "first_month": "2022-11", "changes": [{"month": "2022-12", "li": [{"name": "energy source code", "from": "", "to": "MWH", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-04", "to": "2023-03", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "3", "entity id": "3046", "entity name": "Duke Energy Progress - (NC)", "plant producer type": "Electric Utility", "plant name": "Camp Lejeune Solar and Energy Storage", "plant state": "NC", "plant id": "59966", "generator id": "ES1", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59966", "date": "2023-03", "mw": 11}, "current_month": "2024-02", "dates": {"first_heard": "2022-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2023-03", "start_estimated": "2023-04", "month_disappeared": "", "go_live": "2023-03", "go_live_year_int": 2023, "name": "Camp Lejeune Solar and Energy Storage", "name_short": "Camp Lejeune Solar", "owner": "Duke Energy Progress - (NC)", "state": "north carolina", "country": "usa", "lat": "36.16381327036728", "long": "-76.6535423095525", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.16381327036728+-76.6535423095525", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "El Sol BESS", "city": "", "id": "146", "external_id": "62964", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "146", "external_id": "62964", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "El Sol BESS", "external_id": "62964", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"EL50M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "El Sol BESS", "plant state": "AZ", "plant id": "62964", "generator id": "EL50M", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62964", "date": "2021-12", "mw": 50}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "2", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "El Sol BESS", "plant state": "AZ", "plant id": "62964", "generator id": "EL50M", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62964", "date": "2023-02", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-02", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "El Sol BESS", "name_short": "El Sol", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.68005298145457", "long": "-109.9507656028075", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.68005298145457+-109.9507656028075", "construction_time_month": 4, "construction_speed_mwh_per_month": 25, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Star Hybrid", "city": "", "id": "156", "external_id": "59444", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "156", "external_id": "59444", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Star Hybrid", "external_id": "59444", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2022-03", "start_operation": "2023-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DS10M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Desert Star Hybrid", "plant state": "AZ", "plant id": "59444", "generator id": "DS10M", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "59444", "date": "2021-12", "mw": 10}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "date", "from": "2021-12", "to": "2022-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "2", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Desert Star Hybrid", "plant state": "AZ", "plant id": "59444", "generator id": "DS10M", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59444", "date": "2023-02", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2021-04", "start_construction": "2022-03"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2022-03", "start_operation": "2023-02", "start_estimated": "2022-06", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "Desert Star Hybrid", "name_short": "Desert Star", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.25778388821952", "long": "-109.81356205730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.25778388821952+-109.81356205730502", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lake Placid Solar Power Plant", "city": "", "id": "555", "external_id": "62541", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Duke Energy Florida, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "555", "external_id": "62541", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lake Placid Solar Power Plant", "external_id": "62541", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 34, "power_mw": 17, "owner": "Duke Energy Florida, LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2023-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ES1": {"first": {"year": "2021", "month": "12", "entity id": "6455", "entity name": "Duke Energy Florida, LLC", "plant producer type": "Electric Utility", "plant name": "Lake Placid Solar Power Plant", "plant state": "FL", "plant id": "62541", "generator id": "ES1", "net summer capacity (mw)": "17.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "62541", "date": "2021-12", "mw": 17}, "first_month": "2021-11", "changes": [{"month": "2021-12", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "2", "entity id": "6455", "entity name": "Duke Energy Florida, LLC", "plant producer type": "Electric Utility", "plant name": "Lake Placid Solar Power Plant", "plant state": "FL", "plant id": "62541", "generator id": "ES1", "net summer capacity (mw)": "17.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62541", "date": "2023-02", "mw": 17}, "current_month": "2024-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 17, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2023-02", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "Lake Placid Solar Power Plant", "name_short": "Lake Placid Solar", "owner": "Duke Energy Florida, LLC", "state": "florida", "country": "usa", "lat": "29.921984", "long": "-82.147522", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:29.921984+-82.147522", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jurong Island", "city": "", "id": "867", "external_id": "", "state": "", "country": "singapore", "capacity_mwh": "285", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "", "developer": "sembcorp", "manufacturer": "huawei", "type": "", "cells": "lfp", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-02-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "1.266316", "long": "103.703028", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/southeast-asias-biggest-battery-storage-project-officially-opened-in-singapore/", "link2": "", "link3": "", "link4": ""}, "internal_id": "867", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 200, "mwh_is_estimate": false, "mwh": 285, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2023-02-02", "start_estimated": "", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "Jurong Island", "name_short": "Jurong Island", "owner": "", "state": "", "country": "singapore", "lat": "1.266316", "long": "103.703028", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:1.266316+103.703028", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/southeast-asias-biggest-battery-storage-project-officially-opened-in-singapore/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "city": "", "id": "905", "external_id": "12725", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Zenobe Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-02-01", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "905", "external_id": "12725", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "external_id": "12725", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Zenobe Energy Limited", "status": "operation", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "2023-02-14", "start_estimated": "", "month_disappeared": "", "lat": "53.256874", "long": "-2.95341", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12725", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Zenobe Energy Limited", "Site Name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH1 6HE", "X-coordinate": "336493", "Y-coordinate": "373743", "Planning Authority": "Cheshire West & Chester Council", "Planning Application Reference": "20/03681/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/02/2024", "Under Construction": "01/06/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.256874", "long": "-2.95341", "status": "construction", "mw": 100, "ext_id": "12725"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/11/2022", "to": "14/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "01/02/2024", "to": "01/06/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/06/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "11/02/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Cheshire West & Chester Council", "to": "Cheshire West and Chester Council", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "11/02/2023", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12725", "Record Last Updated (dd/mm/yyyy)": "14/02/2023", "Operator (or Applicant)": "Zenobe Energy Limited", "Site Name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH1 6HE", "X-coordinate": "336493", "Y-coordinate": "373743", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "20/03681/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/06/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.256874", "long": "-2.95341", "status": "operation", "mw": 100, "ext_id": "12725"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-28", "start_construction": "", "start_operation": "2023-02-14"}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02-01", "start_construction": "2021-06-01", "start_operation": "2023-02-14", "start_estimated": "", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "name_short": "National Grid Electricity Substatio...", "owner": "Zenobe Energy Limited", "state": "north west", "country": "uk", "lat": "53.256874", "long": "-2.95341", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.256874+-2.95341", "construction_time_month": 20, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Waiawa Solar Power Hybrid", "city": "", "id": "557", "external_id": "65058", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Waiawa Solar Power LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "557", "external_id": "65058", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Waiawa Solar Power Hybrid", "external_id": "65058", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 72, "power_mw": 36, "owner": "Waiawa Solar Power LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "2022-01", "start_operation": "2023-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WAIBA": {"first": {"year": "2022", "month": "9", "entity id": "64474", "entity name": "Waiawa Solar Power LLC", "plant producer type": "IPP", "plant name": "Waiawa Solar Power Hybrid", "plant state": "HI", "plant id": "65058", "generator id": "WAIBA", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65058", "date": "2022-09", "mw": 36}, "first_month": "2021-11", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "1", "entity id": "64474", "entity name": "Waiawa Solar Power LLC", "plant producer type": "IPP", "plant name": "Waiawa Solar Power Hybrid", "plant state": "HI", "plant id": "65058", "generator id": "WAIBA", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65058", "date": "2023-01", "mw": 36}, "current_month": "2024-02", "dates": {"first_heard": "2021-11", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 36, "mwh_is_estimate": true, "mwh": 72, "mwh_estimate": 72, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "2022-01", "start_operation": "2023-01", "start_estimated": "2022-09", "month_disappeared": "", "go_live": "2023-01", "go_live_year_int": 2023, "name": "Waiawa Solar Power Hybrid", "name_short": "Waiawa Solar Power", "owner": "Waiawa Solar Power LLC", "state": "hawaii", "country": "usa", "lat": "19.406354683428763", "long": "-155.3642375459177", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.406354683428763+-155.3642375459177", "construction_time_month": 12, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Farm Solar Park", "city": "", "id": "502", "external_id": "9361", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Voltalia UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-11-15", "start_construction": "2021-01-07", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "502", "external_id": "9361", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Farm Solar Park", "external_id": "9361", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Voltalia UK", "status": "operation", "date_first_heard": "2019-11-15", "start_construction": "2021-01-07", "start_operation": "2022-12-21", "start_estimated": "", "month_disappeared": "", "lat": "50.813188", "long": "-2.141475", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9361", "Record Last Updated (dd/mm/yyyy)": "28/07/2021", "Operator (or Applicant)": "Voltalia UK", "Site Name": "South Farm Solar Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9360", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "South Farm, Field Dairy To Louse Lane, Spetisbury, Blandford Forum", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT11 9DY", "X-coordinate": "390129", "Y-coordinate": "101525", "Planning Authority": "North Dorset District Council", "Planning Application Reference": "2/2019/0850/PAEIA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "07/01/2021", "Operational": "", "Heat Network Ref": "", "lat": "50.813188", "long": "-2.141475", "status": "construction", "mw": 10, "ext_id": "9361"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/07/2021", "to": "21/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "16/12/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Operational", "from": "16/12/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9361", "Record Last Updated (dd/mm/yyyy)": "21/12/2022", "Operator (or Applicant)": "Voltalia UK", "Site Name": "South Farm Solar Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9360", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Farm, Field Dairy To Louse Lane, Spetisbury, Blandford Forum", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT11 9DY", "X-coordinate": "390129", "Y-coordinate": "101525", "Planning Authority": "North Dorset District Council", "Planning Application Reference": "2/2019/0850/PAEIA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "07/01/2021", "Operational": "", "Heat Network Ref": "", "lat": "50.813188", "long": "-2.141475", "status": "operation", "mw": 10, "ext_id": "9361"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-28", "start_construction": "", "start_operation": "2022-12-21"}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-11-15", "start_construction": "2021-01-07", "start_operation": "2022-12-21", "start_estimated": "", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "South Farm Solar Park", "name_short": "South Farm Solar Park", "owner": "Voltalia UK", "state": "south west", "country": "uk", "lat": "50.813188", "long": "-2.141475", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.813188+-2.141475", "construction_time_month": 23, "construction_speed_mwh_per_month": 0, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blythe Mesa Solar II", "city": "", "id": "548", "external_id": "65053", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Blythe Mesa Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "548", "external_id": "65053", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blythe Mesa Solar II", "external_id": "65053", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 224, "power_mw": 112, "owner": "Blythe Mesa Solar II, LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "2022-01", "start_operation": "2022-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BMSES": {"first": {"year": "2022", "month": "11", "entity id": "64459", "entity name": "Blythe Mesa Solar II, LLC", "plant producer type": "IPP", "plant name": "Blythe Mesa Solar II", "plant state": "CA", "plant id": "65053", "generator id": "BMSES", "net summer capacity (mw)": "112", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65053", "date": "2022-11", "mw": 112}, "first_month": "2021-11", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "12", "entity id": "64459", "entity name": "Blythe Mesa Solar II, LLC", "plant producer type": "IPP", "plant name": "Blythe Mesa Solar II", "plant state": "CA", "plant id": "65053", "generator id": "BMSES", "net summer capacity (mw)": "112", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65053", "date": "2022-12", "mw": 112}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 112, "mwh_is_estimate": true, "mwh": 224, "mwh_estimate": 224, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "2022-01", "start_operation": "2022-12", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Blythe Mesa Solar II", "name_short": "Blythe Mesa Solar II", "owner": "Blythe Mesa Solar II, LLC", "state": "california", "country": "usa", "lat": "41.273150024586876", "long": "-121.50715735055999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.273150024586876+-121.50715735055999", "construction_time_month": 11, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BigBeau Solar, LLC", "city": "", "id": "550", "external_id": "64993", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Big Beau Solar, LLC ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "550", "external_id": "64993", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "BigBeau Solar, LLC", "external_id": "64993", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Big Beau Solar, LLC ", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BB1BA": {"first": {"year": "2022", "month": "4", "entity id": "64424", "entity name": "Big Beau Solar, LLC ", "plant producer type": "IPP", "plant name": "BigBeau Solar, LLC", "plant state": "CA", "plant id": "64993", "generator id": "BB1BA", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64993", "date": "2022-04", "mw": 40}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "12", "entity id": "64424", "entity name": "Big Beau Solar, LLC ", "plant producer type": "IPP", "plant name": "BigBeau Solar, LLC", "plant state": "CA", "plant id": "64993", "generator id": "BB1BA", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64993", "date": "2022-12", "mw": 40}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-12", "start_estimated": "2022-04", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "BigBeau Solar, LLC", "name_short": "BigBeau Solar", "owner": "Big Beau Solar, LLC ", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.400049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.400049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX23 Roughneck Storage", "city": "", "id": "722", "external_id": "65701", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "722", "external_id": "65701", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX23 Roughneck Storage", "external_id": "65701", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX23": {"first": {"year": "2022", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX23 Roughneck Storage", "plant state": "TX", "plant id": "65701", "generator id": "TX23", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65701", "date": "2022-07", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX23 Roughneck Storage", "plant state": "TX", "plant id": "65701", "generator id": "TX23", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65701", "date": "2022-12", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-12", "start_estimated": "2022-07", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "TX23 Roughneck Storage", "name_short": "TX23 Roughneck", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.503427961192564", "long": "-95.20548057247251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.503427961192564+-95.20548057247251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX13 Endurance Park Storage", "city": "", "id": "723", "external_id": "65696", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "723", "external_id": "65696", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX13 Endurance Park Storage", "external_id": "65696", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX13": {"first": {"year": "2022", "month": "11", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX13 Endurance Park Storage", "plant state": "TX", "plant id": "65696", "generator id": "TX13", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65696", "date": "2022-11", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX13 Endurance Park Storage", "plant state": "TX", "plant id": "65696", "generator id": "TX13", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65696", "date": "2022-12", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-12", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "TX13 Endurance Park Storage", "name_short": "TX13 Endurance Park", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.53980980140374", "long": "-95.211132763257", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.53980980140374+-95.211132763257", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lessines", "city": "", "id": "843", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "Corsica Sole", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "cost_million": "33", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "50.72743", "long": "3.854307", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://insideevs.com/news/625965/tesla-megapack-battery-belgium/", "link2": "", "link3": "", "link4": ""}, "internal_id": "843", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Lessines", "name_short": "Lessines", "owner": "", "state": "", "country": "belgium", "lat": "50.72743", "long": "3.854307", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.72743+3.854307", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://insideevs.com/news/625965/tesla-megapack-battery-belgium/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Broadditch", "city": "Southfleet", "id": "845", "external_id": "", "state": "kent", "country": "uk", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.41493", "long": "0.32622", "coords_hint": "1", "use_case": "", "notes": "uses the megapack xl", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf", "link3": "", "link4": ""}, "internal_id": "845", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 11, "mwh_is_estimate": false, "mwh": 22, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Broadditch", "name_short": "Broadditch", "owner": "Harmony Energy Income Trust", "state": "kent", "country": "uk", "lat": "51.41493", "long": "0.32622", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.41493+0.32622", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 6, "notes_split": ["uses the megapack xl"], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Taos Mesa Energy Facility Hybrid", "city": "", "id": "226", "external_id": "63728", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Taos Mesa Energy Facility, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "226", "external_id": "63728", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Taos Mesa Energy Facility Hybrid", "external_id": "63728", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Taos Mesa Energy Facility, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-05", "start_operation": "2022-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2021", "month": "9", "entity id": "63420", "entity name": "Taos Mesa Energy Facility, LLC", "plant producer type": "IPP", "plant name": "Taos Mesa Energy Facility Hybrid", "plant state": "NM", "plant id": "63728", "generator id": "BESS", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63728", "date": "2021-09", "mw": 12}, "first_month": "2020-09", "changes": [{"month": "2021-07", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2023-03", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2023-03", "to": "2022-05", "extra": "accelerated by 10 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "plant producer type", "from": "IPP", "to": "Electric Utility", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "11", "entity id": "63420", "entity name": "Taos Mesa Energy Facility, LLC", "plant producer type": "Electric Utility", "plant name": "Taos Mesa Energy Facility Hybrid", "plant state": "NM", "plant id": "63728", "generator id": "BESS", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63728", "date": "2022-11", "mw": 12}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-05"}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-05", "start_operation": "2022-11", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Taos Mesa Energy Facility Hybrid", "name_short": "Taos Mesa Energy Facility", "owner": "Taos Mesa Energy Facility, LLC", "state": "new mexico", "country": "usa", "lat": "36.613442720802766", "long": "-103.73112992303248", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.613442720802766+-103.73112992303248", "construction_time_month": 6, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Melksham Substation East Storage", "city": "", "id": "287", "external_id": "6953", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy / Melksham East Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "287", "external_id": "6953", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Melksham Substation East Storage", "external_id": "6953", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Statera Energy / Melksham East Storage", "status": "operation", "date_first_heard": "2017-09-28", "start_construction": "2022-01-01", "start_operation": "2022-11-07", "start_estimated": "", "month_disappeared": "", "lat": "51.399186", "long": "-2.153916", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6953", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy / Melksham East Storage", "Site Name": "Melksham Substation East Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land to the south of Melksham Substation Westlands Farm Westlands Lane Whitley Melksham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN12 7QG", "X-coordinate": "389389", "Y-coordinate": "166695", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "17/04110/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.399186", "long": "-2.153916", "status": "planning", "mw": 50, "ext_id": "6953"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2020", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "22/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "07/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "22/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6953", "Record Last Updated (dd/mm/yyyy)": "22/11/2022", "Operator (or Applicant)": "Statera Energy / Melksham East Storage", "Site Name": "Melksham Substation East Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south of Melksham Substation Westlands Farm Westlands Lane Whitley Melksham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN12 7QG", "X-coordinate": "389389", "Y-coordinate": "166695", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "17/04110/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2020", "Under Construction": "01/01/2022", "Operational": "07/11/2022", "Heat Network Ref": "", "lat": "51.399186", "long": "-2.153916", "status": "operation", "mw": 50, "ext_id": "6953"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "2020-08-21", "start_operation": "2022-11-22"}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-09-28", "start_construction": "2022-01-01", "start_operation": "2022-11-07", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Melksham Substation East Storage", "name_short": "Melksham Substation East", "owner": "Statera Energy / Melksham East Storage", "state": "south west", "country": "uk", "lat": "51.399186", "long": "-2.153916", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.399186+-2.153916", "construction_time_month": 10, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pillswood Phase 1", "city": "Cottingham", "id": "299", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": ""}, "internal_id": "299", "external_id": "7005", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pillswood Phase 1 ", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.801332", "long": "-0.415133", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7005", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Creyke Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504478", "Y-coordinate": "435057", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01993/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.801332", "long": "-0.415133", "status": "planning", "mw": 49, "ext_id": "7005"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "7360", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/11/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2019", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Creyke Substation", "to": "Pillswood Phase 1 ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Revised", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Revised", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "7360", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7005", "Record Last Updated (dd/mm/yyyy)": "09/11/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Pillswood Phase 1 ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504478", "Y-coordinate": "435057", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01993/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2020", "Under Construction": "01/04/2022", "Operational": "01/11/2022", "Heat Network Ref": "", "lat": "53.801332", "long": "-0.415133", "status": "operation", "mw": 49, "ext_id": "7005"}, "current_month": "2024-01", "dates": {"first_heard": "2019-06-13", "start_construction": "", "start_operation": "2022-11-09"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-11-17", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Pillswood Phase 1 ", "name_short": "Pillswood Phase 1 ", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.801332", "long": "-0.415133", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.801332+-0.415133", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 39, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Byrd Ranch Storage", "city": "", "id": "579", "external_id": "65259", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Byrd Ranch Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "579", "external_id": "65259", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Byrd Ranch Storage", "external_id": "65259", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Byrd Ranch Storage LLC", "status": "operation", "date_first_heard": "2022-02", "start_construction": "2022-03", "start_operation": "2022-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"P1": {"first": {"year": "2022", "month": "8", "entity id": "64564", "entity name": "Byrd Ranch Storage LLC", "plant producer type": "IPP", "plant name": "Byrd Ranch Storage", "plant state": "TX", "plant id": "65259", "generator id": "P1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65259", "date": "2022-08", "mw": 50}, "first_month": "2022-02", "changes": [{"month": "2022-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "11", "entity id": "64564", "entity name": "Byrd Ranch Storage LLC", "plant producer type": "IPP", "plant name": "Byrd Ranch Storage", "plant state": "TX", "plant id": "65259", "generator id": "P1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65259", "date": "2022-11", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2022-02", "start_construction": "2022-03"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-02", "start_construction": "2022-03", "start_operation": "2022-11", "start_estimated": "2022-08", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Byrd Ranch Storage", "name_short": "Byrd Ranch", "owner": "Byrd Ranch Storage LLC", "state": "texas", "country": "usa", "lat": "33.349606255901264", "long": "-94.95198089749223", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.349606255901264+-94.95198089749223", "construction_time_month": 8, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Danville BESS 1", "city": "", "id": "690", "external_id": "65499", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Doc Brown LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "690", "external_id": "65499", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Danville BESS 1", "external_id": "65499", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Doc Brown LLC", "status": "operation", "date_first_heard": "2022-04", "start_construction": "", "start_operation": "2022-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"90909": {"first": {"year": "2022", "month": "6", "entity id": "64809", "entity name": "Doc Brown LLC", "plant producer type": "IPP", "plant name": "Danville BESS 1", "plant state": "VA", "plant id": "65499", "generator id": "90909", "net summer capacity (mw)": "10.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65499", "date": "2022-06", "mw": 10}, "first_month": "2022-04", "changes": [{"month": "2022-06", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-07", "to": "2022-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "11", "entity id": "64809", "entity name": "Doc Brown LLC", "plant producer type": "IPP", "plant name": "Danville BESS 1", "plant state": "VA", "plant id": "65499", "generator id": "90909", "net summer capacity (mw)": "10.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65499", "date": "2022-11", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2022-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-04", "start_construction": "", "start_operation": "2022-11", "start_estimated": "2022-06", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Danville BESS 1", "name_short": "Danville BESS 1", "owner": "Doc Brown LLC", "state": "virginia", "country": "usa", "lat": "38.160223", "long": "-77.98875000000001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.160223+-77.98875000000001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elsteraue Battery Storage", "city": "", "id": "842", "external_id": "SEE932907515472", "state": "saxony-anhalt", "country": "germany", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "842", "external_id": "SEE932907515472", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Elsteraue Battery Storage", "external_id": "SEE932907515472", "state": "saxony-anhalt", "country": "germany", "mwh": 16, "estimate_mwh": "", "power_mw": 13, "owner": "Obton Storage GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-18", "start_estimated": "", "month_disappeared": "", "lat": "51.074722", "long": "12.197500", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5429476"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE932907515472", "DatumLetzteAktualisierung": "2022-11-29T09:54:33.6669074", "LokationMaStRNummer": "SEL987631756653", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-29", "AnlagenbetreiberMastrNummer": "ABR948334917826", "Land": "84", "Bundesland": "1414", "Landkreis": "Burgenlandkreis", "Gemeinde": "Elsteraue", "Gemeindeschluessel": "15084130", "Postleitzahl": "06729", "Strasse": "Hauptstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Adresszusatz": "Hauptstra\u00dfe", "Ort": "Elsteraue", "Laengengrad": "12.197500", "Breitengrad": "51.074722", "Registrierungsdatum": "2022-11-29", "Inbetriebnahmedatum": "2022-11-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Elsteraue Battery Storage", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE900249956468", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13800.000", "SpeMastrNummer": "SSE913613213043", "EegMaStRNummer": "EEG982859885529", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5429476", "owner": "Obton Storage GmbH \uff06 Co. KG", "mwh": 16, "ext_id": "SEE932907515472", "mw": 13, "status": "operation"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE932907515472", "DatumLetzteAktualisierung": "2022-11-29T09:54:33.6669074", "LokationMaStRNummer": "SEL987631756653", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-29", "AnlagenbetreiberMastrNummer": "ABR948334917826", "Land": "84", "Bundesland": "1414", "Landkreis": "Burgenlandkreis", "Gemeinde": "Elsteraue", "Gemeindeschluessel": "15084130", "Postleitzahl": "06729", "Strasse": "Hauptstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Adresszusatz": "Hauptstra\u00dfe", "Ort": "Elsteraue", "Laengengrad": "12.197500", "Breitengrad": "51.074722", "Registrierungsdatum": "2022-11-29", "Inbetriebnahmedatum": "2022-11-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Elsteraue Battery Storage", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE900249956468", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13800.000", "SpeMastrNummer": "SSE913613213043", "EegMaStRNummer": "EEG982859885529", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5429476", "owner": "Obton Storage GmbH \uff06 Co. KG", "mwh": 16, "ext_id": "SEE932907515472", "mw": 13, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-11-18", "start_estimated": ""}}, "mw": 13, "mwh_is_estimate": false, "mwh": 16, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-18", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Elsteraue Battery Storage", "name_short": "Elsteraue", "owner": "Obton Storage GmbH \uff06 Co. KG", "state": "saxony-anhalt", "country": "germany", "lat": "51.074722", "long": "12.197500", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.074722+12.197500", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5429476"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pillswood Phase 2", "city": "Cottingham", "id": "846", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Tesla", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": "https://twitter.com/Tesla_Megapack/status/1661649261757612032"}, "internal_id": "846", "external_id": "7360", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pillswood Phase 2", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "operation", "date_first_heard": "2019-11-14", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.802281", "long": "-0.416949", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7360", "Record Last Updated (dd/mm/yyyy)": "31/01/2020", "Operator (or Applicant)": "Northern Powergrid", "Site Name": "Creyke Beck Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504356", "Y-coordinate": "435160", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "19/01449/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.802281", "long": "-0.416949", "status": "planning", "mw": 49, "ext_id": "7360"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7005", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2020", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Northern Powergrid", "to": "Harmony Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Creyke Beck Substation", "to": "Pillswood Phase 2", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "7005", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7360", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Pillswood Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504356", "Y-coordinate": "435160", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "19/01449/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2022", "Under Construction": "01/04/2022", "Operational": "01/11/2022", "Heat Network Ref": "", "lat": "53.802281", "long": "-0.416949", "status": "operation", "mw": 49, "ext_id": "7360"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-31", "start_construction": "", "start_operation": "2022-11-09"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-11-14", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Pillswood Phase 2", "name_short": "Pillswood Phase 2", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.802281", "long": "-0.416949", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.802281+-0.416949", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 39, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "https://twitter.com/Tesla_Megapack/status/1661649261757612032"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Orangeville Storage", "city": "", "id": "236", "external_id": "64686", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "236", "external_id": "64686", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Orangeville Storage", "external_id": "64686", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 48, "power_mw": 24, "owner": "Invenergy Services LLC", "status": "operation", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"65002": {"first": {"year": "2021", "month": "8", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Orangeville Storage", "plant state": "NY", "plant id": "64686", "generator id": "65002", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64686", "date": "2021-08", "mw": 20}, "first_month": "2021-07", "changes": [{"month": "2021-09", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}, {"name": "mw", "from": 20, "to": 24, "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-10", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Orangeville Storage", "plant state": "NY", "plant id": "64686", "generator id": "65002", "net summer capacity (mw)": "24.7", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64686", "date": "2022-10", "mw": 24}, "current_month": "2023-02", "dates": {"first_heard": "2021-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 24, "mwh_is_estimate": true, "mwh": 48, "mwh_estimate": 48, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Orangeville Storage", "name_short": "Orangeville", "owner": "Invenergy Services LLC", "state": "new york", "country": "usa", "lat": "42.46940414887133", "long": "-75.44420873708002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.46940414887133+-75.44420873708002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ray Battery Storage Facility", "city": "", "id": "283", "external_id": "6943", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Vattenfall Wind Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "283", "external_id": "6943", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ray Battery Storage Facility", "external_id": "6943", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Vattenfall Wind Power", "status": "operation", "date_first_heard": "2017-07-25", "start_construction": "2022-07-01", "start_operation": "2022-10-01", "start_estimated": "", "month_disappeared": "", "lat": "55.165618", "long": "-2.078", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6943", "Record Last Updated (dd/mm/yyyy)": "21/09/2020", "Operator (or Applicant)": "Vattenfall Wind Power", "Site Name": "Ray Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4026", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne, Northumberland", "County": "Northumberland", "Region": "North East", "Country": "England", "Post Code": "NE19 2RG", "X-coordinate": "395129", "Y-coordinate": "585703", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "17/01923/RENE", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/07/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.165618", "long": "-2.078", "status": "planning", "mw": 20, "ext_id": "6943"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne, Northumberland", "to": "Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne,", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/09/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6943", "Record Last Updated (dd/mm/yyyy)": "27/03/2023", "Operator (or Applicant)": "Vattenfall Wind Power", "Site Name": "Ray Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4026", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne,", "County": "Northumberland", "Region": "North East", "Country": "England", "Post Code": "NE19 2RG", "X-coordinate": "395129", "Y-coordinate": "585703", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "17/01923/RENE", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/07/2022", "Under Construction": "01/07/2022", "Operational": "01/10/2022", "Heat Network Ref": "", "lat": "55.165618", "long": "-2.078", "status": "operation", "mw": 20, "ext_id": "6943"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-07-25", "start_construction": "2022-07-01", "start_operation": "2022-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Ray Battery Storage Facility", "name_short": "Ray", "owner": "Vattenfall Wind Power", "state": "north east", "country": "uk", "lat": "55.165618", "long": "-2.078", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.165618+-2.078", "construction_time_month": 3, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Minety South Battery Storage", "city": "", "id": "362", "external_id": "7184", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "362", "external_id": "7184", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Minety South - Battery Storage", "external_id": "7184", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "operation", "date_first_heard": "2017-07-19", "start_construction": "", "start_operation": "2022-10-01", "start_estimated": "", "month_disappeared": "", "lat": "51.601469", "long": "-1.98817", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7184", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy", "Site Name": "Minety South Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land South of Minety Substation Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP\ufffd", "X-coordinate": "400916", "Y-coordinate": "189181", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "17/03941/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/07/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.601469", "long": "-1.98817", "status": "planning", "mw": 50, "ext_id": "7184"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Site Name", "from": "Minety South Battery Storage", "to": "Minety South - Battery Storage", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "50", "to": "49.99", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 50, "to": 49, "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "21/08/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7184", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy", "Site Name": "Minety South - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South of Minety Substation Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP\ufffd", "X-coordinate": "400916", "Y-coordinate": "189181", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "17/03941/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/07/2020", "Under Construction": "", "Operational": "01/10/2022", "Heat Network Ref": "", "lat": "51.601469", "long": "-1.98817", "status": "operation", "mw": 49, "ext_id": "7184"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "", "start_operation": "2020-08-21"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-07-19", "start_construction": "", "start_operation": "2022-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Minety South - Battery Storage", "name_short": "Minety South", "owner": "Statera Energy", "state": "south west", "country": "uk", "lat": "51.601469", "long": "-1.98817", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.601469+-1.98817", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rabbitbrush Solar, LLC", "city": "", "id": "553", "external_id": "64630", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "553", "external_id": "64630", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rabbitbrush Solar, LLC", "external_id": "64630", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Leeward Asset Management, LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RBBAT": {"first": {"year": "2022", "month": "8", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Rabbitbrush Solar, LLC", "plant state": "CA", "plant id": "64630", "generator id": "RBBAT", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64630", "date": "2022-08", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Rabbitbrush Solar, LLC", "plant state": "CA", "plant id": "64630", "generator id": "RBBAT", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64630", "date": "2022-10", "mw": 20}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-08", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Rabbitbrush Solar, LLC", "name_short": "Rabbitbrush Solar", "owner": "Leeward Asset Management, LLC", "state": "california", "country": "usa", "lat": "40.98838017893376", "long": "-121.39762135188055", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98838017893376+-121.39762135188055", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crimson", "city": "", "id": "570", "external_id": "65140", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "RE Crimson LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "570", "external_id": "65140", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Crimson", "external_id": "65140", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 700, "power_mw": 350, "owner": "RE Crimson LLC", "status": "operation", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"SWSH1": {"first": {"year": "2022", "month": "8", "entity id": "64513", "entity name": "RE Crimson LLC", "plant producer type": "IPP", "plant name": "Crimson", "plant state": "CA", "plant id": "65140", "generator id": "SWSH1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65140", "date": "2022-08", "mw": 200}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-08", "to": "2022-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "64513", "entity name": "RE Crimson LLC", "plant producer type": "IPP", "plant name": "Crimson", "plant state": "CA", "plant id": "65140", "generator id": "SWSH1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65140", "date": "2022-10", "mw": 200}, "current_month": "2023-02", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}, "SWSH2": {"first": {"year": "2022", "month": "10", "entity id": "64513", "entity name": "RE Crimson LLC", "plant producer type": "IPP", "plant name": "Crimson", "plant state": "CA", "plant id": "65140", "generator id": "SWSH2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65140", "date": "2022-10", "mw": 150}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-10", "to": "2022-08", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "64513", "entity name": "RE Crimson LLC", "plant producer type": "IPP", "plant name": "Crimson", "plant state": "CA", "plant id": "65140", "generator id": "SWSH2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65140", "date": "2022-10", "mw": 150}, "current_month": "2023-02", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 350, "mwh_is_estimate": true, "mwh": 700, "mwh_estimate": 700, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-08", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Crimson", "name_short": "Crimson", "owner": "RE Crimson LLC", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.440049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.440049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Noble Solar", "city": "", "id": "578", "external_id": "65271", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "BT Noble Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "578", "external_id": "65271", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Noble Solar", "external_id": "65271", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "BT Noble Solar, LLC", "status": "operation", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NBSTG": {"first": {"year": "2022", "month": "6", "entity id": "64568", "entity name": "BT Noble Solar, LLC", "plant producer type": "IPP", "plant name": "Noble Solar", "plant state": "TX", "plant id": "65271", "generator id": "NBSTG", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65271", "date": "2022-06", "mw": 125}, "first_month": "2022-02", "changes": [{"month": "2022-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-06", "to": "2022-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "64568", "entity name": "BT Noble Solar, LLC", "plant producer type": "IPP", "plant name": "Noble Solar", "plant state": "TX", "plant id": "65271", "generator id": "NBSTG", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65271", "date": "2022-10", "mw": 125}, "current_month": "2023-02", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-06", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Noble Solar", "name_short": "Noble Solar", "owner": "BT Noble Solar, LLC", "state": "texas", "country": "usa", "lat": "33.268313860275576", "long": "-95.01778862977751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.268313860275576+-95.01778862977751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dalian Flow Battery", "city": "Dalian", "id": "692", "external_id": "", "state": "liaoning", "country": "china", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Dalian Institute of Chemical Physics", "developer": "", "manufacturer": "", "type": "vanadium flow", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-05", "start_estimated": "", "cost_million": "266", "cost_currency": "USD", "cost_incl_solar": "", "lat": "38.858928", "long": "121.517064", "coords_hint": "3", "use_case": "peak shaving", "notes": "will be scaled up to 200mw/800mwh", "project_website": "", "link1": "https://www.pv-magazine.com/2022/09/29/china-connects-worlds-largest-redox-flow-battery-system-to-grid/", "link2": "", "link3": "", "link4": ""}, "internal_id": "692", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-05", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Dalian Flow Battery", "name_short": "Dalian Flow Battery", "owner": "Dalian Institute of Chemical Physics", "state": "liaoning", "country": "china", "lat": "38.858928", "long": "121.517064", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.858928+121.517064", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["will be scaled up to 200mw/800mwh"], "links": ["https://www.pv-magazine.com/2022/09/29/china-connects-worlds-largest-redox-flow-battery-system-to-grid/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX12 Silicon Hill Storage", "city": "", "id": "717", "external_id": "65695", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "717", "external_id": "65695", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX12 Silicon Hill Storage", "external_id": "65695", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX12": {"first": {"year": "2022", "month": "9", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX12 Silicon Hill Storage", "plant state": "TX", "plant id": "65695", "generator id": "TX12", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65695", "date": "2022-09", "mw": 100}, "first_month": "2022-07", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX12 Silicon Hill Storage", "plant state": "TX", "plant id": "65695", "generator id": "TX12", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65695", "date": "2022-10", "mw": 100}, "current_month": "2023-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-09", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "TX12 Silicon Hill Storage", "name_short": "TX12 Silicon Hill", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.313285042978755", "long": "-95.17116336610111", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.313285042978755+-95.17116336610111", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX11 Republic Road Storage", "city": "", "id": "721", "external_id": "65694", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "721", "external_id": "65694", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX11 Republic Road Storage", "external_id": "65694", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX11": {"first": {"year": "2022", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX11 Republic Road Storage", "plant state": "TX", "plant id": "65694", "generator id": "TX11", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65694", "date": "2022-07", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX11 Republic Road Storage", "plant state": "TX", "plant id": "65694", "generator id": "TX11", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65694", "date": "2022-10", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-07", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "TX11 Republic Road Storage", "name_short": "TX11 Republic Road", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.47321305365124", "long": "-95.2144724959897", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.47321305365124+-95.2144724959897", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hawkers Hill Energy Park", "city": "", "id": "836", "external_id": "12293", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Tag Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-09-22", "start_construction": "2020-05-05", "start_operation": "2022-10-03", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "836", "external_id": "12293", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hawkers Hill Energy Park", "external_id": "12293", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Tag Energy", "status": "operation", "date_first_heard": "2017-09-22", "start_construction": "2020-05-05", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.013484", "long": "-2.212803", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12293", "Record Last Updated (dd/mm/yyyy)": "13/10/2022", "Operator (or Applicant)": "Tag Energy", "Site Name": "Hawkers Hill Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawkers Hill Farm, : Shaftesbury Road, Motcombe", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "SP7 9NP", "X-coordinate": "385168", "Y-coordinate": "123811", "Planning Authority": "Dorset Council", "Planning Application Reference": "2/2017/1066/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2020", "Under Construction": "05/05/2020", "Operational": "03/10/2022", "Heat Network Ref": "", "lat": "51.013484", "long": "-2.212803", "status": "operation", "mw": 20, "ext_id": "12293"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "22/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Operational", "from": "03/10/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12293", "Record Last Updated (dd/mm/yyyy)": "13/10/2022", "Operator (or Applicant)": "Tag Energy", "Site Name": "Hawkers Hill Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawkers Hill Farm, : Shaftesbury Road, Motcombe", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "SP7 9NP", "X-coordinate": "385168", "Y-coordinate": "123811", "Planning Authority": "Dorset Council", "Planning Application Reference": "2/2017/1066/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "05/05/2020", "Operational": "", "Heat Network Ref": "", "lat": "51.013484", "long": "-2.212803", "status": "operation", "mw": 20, "ext_id": "12293"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-09-22", "start_construction": "2020-05-05", "start_operation": "2022-10-03", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Hawkers Hill Energy Park", "name_short": "Hawkers Hill Energy Park", "owner": "Tag Energy", "state": "south west", "country": "uk", "lat": "51.013484", "long": "-2.212803", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.013484+-2.212803", "construction_time_month": 29, "construction_speed_mwh_per_month": 0, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batterie Iphofen", "city": "", "id": "840", "external_id": "SEE934353123843", "state": "bavaria", "country": "germany", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "840", "external_id": "SEE934353123843", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batterie Iphofen", "external_id": "SEE934353123843", "state": "bavaria", "country": "germany", "mwh": 20, "estimate_mwh": "", "power_mw": 20, "owner": "VERBUND Energy4Business Germany GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": "", "month_disappeared": "", "lat": "49.693979", "long": "10.254467", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5436401"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE934353123843", "DatumLetzteAktualisierung": "2022-10-31T09:44:27.1024911", "LokationMaStRNummer": "SEL981216731097", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-10-31", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1403", "Landkreis": "Kitzingen", "Gemeinde": "Iphofen", "Gemeindeschluessel": "09675139", "Postleitzahl": "97346", "Gemarkung": "Iphofen", "FlurFlurstuecknummern": "3865/1", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Iphofen", "Laengengrad": "10.254467", "Breitengrad": "49.693979", "Registrierungsdatum": "2022-10-31", "Inbetriebnahmedatum": "2022-10-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Iphofen", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "20700.000", "Nettonennleistung": "20700.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20700.000", "SpeMastrNummer": "SSE993502752778", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5436401", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 20, "ext_id": "SEE934353123843", "mw": 20, "status": "operation"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE934353123843", "DatumLetzteAktualisierung": "2022-10-31T09:44:27.1024911", "LokationMaStRNummer": "SEL981216731097", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-10-31", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1403", "Landkreis": "Kitzingen", "Gemeinde": "Iphofen", "Gemeindeschluessel": "09675139", "Postleitzahl": "97346", "Gemarkung": "Iphofen", "FlurFlurstuecknummern": "3865/1", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Iphofen", "Laengengrad": "10.254467", "Breitengrad": "49.693979", "Registrierungsdatum": "2022-10-31", "Inbetriebnahmedatum": "2022-10-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Iphofen", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "20700.000", "Nettonennleistung": "20700.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20700.000", "SpeMastrNummer": "SSE993502752778", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5436401", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 20, "ext_id": "SEE934353123843", "mw": 20, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": ""}}, "mw": 20, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Batterie Iphofen", "name_short": "Batterie Iphofen", "owner": "VERBUND Energy4Business Germany GmbH", "state": "bavaria", "country": "germany", "lat": "49.693979", "long": "10.254467", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.693979+10.254467", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5436401"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bad D\u00fcben Battery Storage", "city": "", "id": "841", "external_id": "SEE961989517128", "state": "saxony", "country": "germany", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "841", "external_id": "SEE961989517128", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Bad D\u00fcben Battery Storage", "external_id": "SEE961989517128", "state": "saxony", "country": "germany", "mwh": 16, "estimate_mwh": "", "power_mw": 13, "owner": "Obton Storage GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": "", "month_disappeared": "", "lat": "51.587220", "long": "12.603890", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5428849"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE961989517128", "DatumLetzteAktualisierung": "2022-11-29T09:37:37.1680246", "LokationMaStRNummer": "SEL920993178671", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-29", "AnlagenbetreiberMastrNummer": "ABR948334917826", "Land": "84", "Bundesland": "1413", "Landkreis": "Nordsachsen", "Gemeinde": "Bad D\u00fcben", "Gemeindeschluessel": "14730020", "Postleitzahl": "04849", "Strasse": "Steinlache", "StrasseNichtGefunden": "0", "Hausnummer": "4", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bad D\u00fcben", "Laengengrad": "12.603890", "Breitengrad": "51.587220", "Registrierungsdatum": "2022-11-03", "Inbetriebnahmedatum": "2022-10-19", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Bad D\u00fcben Battery Storage", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE994278987630", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13800.000", "SpeMastrNummer": "SSE966531784430", "EegMaStRNummer": "EEG930106323720", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5428849", "owner": "Obton Storage GmbH \uff06 Co. KG", "mwh": 16, "ext_id": "SEE961989517128", "mw": 13, "status": "operation"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE961989517128", "DatumLetzteAktualisierung": "2022-11-29T09:37:37.1680246", "LokationMaStRNummer": "SEL920993178671", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-29", "AnlagenbetreiberMastrNummer": "ABR948334917826", "Land": "84", "Bundesland": "1413", "Landkreis": "Nordsachsen", "Gemeinde": "Bad D\u00fcben", "Gemeindeschluessel": "14730020", "Postleitzahl": "04849", "Strasse": "Steinlache", "StrasseNichtGefunden": "0", "Hausnummer": "4", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bad D\u00fcben", "Laengengrad": "12.603890", "Breitengrad": "51.587220", "Registrierungsdatum": "2022-11-03", "Inbetriebnahmedatum": "2022-10-19", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Bad D\u00fcben Battery Storage", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE994278987630", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13800.000", "SpeMastrNummer": "SSE966531784430", "EegMaStRNummer": "EEG930106323720", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5428849", "owner": "Obton Storage GmbH \uff06 Co. KG", "mwh": 16, "ext_id": "SEE961989517128", "mw": 13, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": ""}}, "mw": 13, "mwh_is_estimate": false, "mwh": 16, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Bad D\u00fcben Battery Storage", "name_short": "Bad D\u00fcben", "owner": "Obton Storage GmbH \uff06 Co. KG", "state": "saxony", "country": "germany", "lat": "51.587220", "long": "12.603890", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.587220+12.603890", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5428849"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cirencester Solar Farm", "city": "", "id": "911", "external_id": "12791", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Warrington Borough Council / Statkraft", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2015-09-17", "start_construction": "2018-09-06", "start_operation": "2022-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "911", "external_id": "12791", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cirencester Solar Farm", "external_id": "12791", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Warrington Borough Council / Statkraft", "status": "operation", "date_first_heard": "2015-09-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.710858", "long": "-1.921697", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12791", "Record Last Updated (dd/mm/yyyy)": "06/12/2022", "Operator (or Applicant)": "Warrington Borough Council / Statkraft", "Site Name": "Cirencester Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5276", "Installed Capacity (MWelec)": "10", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Parcel East Of, Wilpit Lane, Preston, Cirencester", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL7 5", "X-coordinate": "405507", "Y-coordinate": "201350", "Planning Authority": "Cotswold District Council", "Planning Application Reference": "15/01923/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2015", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/09/2015", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/09/2018", "Under Construction": "06/09/2018", "Operational": "13/10/2022", "Heat Network Ref": "", "lat": "51.710858", "long": "-1.921697", "status": "operation", "mw": 10, "ext_id": "12791"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "17/09/2018", "to": "06/09/2018", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "06/09/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Operational", "from": "13/10/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12791", "Record Last Updated (dd/mm/yyyy)": "06/12/2022", "Operator (or Applicant)": "Warrington Borough Council / Statkraft", "Site Name": "Cirencester Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5276", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Parcel East Of, Wilpit Lane, Preston, Cirencester", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL7 5", "X-coordinate": "405507", "Y-coordinate": "201350", "Planning Authority": "Cotswold District Council", "Planning Application Reference": "15/01923/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2015", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/09/2015", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/09/2018", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.710858", "long": "-1.921697", "status": "operation", "mw": 10, "ext_id": "12791"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2015-09-17", "start_construction": "2018-09-06", "start_operation": "2022-10-13", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Cirencester Solar Farm", "name_short": "Cirencester Solar Farm", "owner": "Warrington Borough Council / Statkraft", "state": "south west", "country": "uk", "lat": "51.710858", "long": "-1.921697", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.710858+-1.921697", "construction_time_month": 49, "construction_speed_mwh_per_month": 0, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "LeConte", "city": "Calexico / Imperial County", "id": "50", "external_id": "64701", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "125", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.67641", "long": "-115.670255", "coords_hint": "1", "use_case": "", "notes": "planning doc is available", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://ceqanet.opr.ca.gov/2010111056/7", "link3": "", "link4": ""}, "internal_id": "50", "external_id": "64701", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "LeConte Energy Storage", "external_id": "64701", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "LeConte Energy Storage, LLC", "status": "operation", "date_first_heard": "2021-07", "start_construction": "2022-01", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LCES": {"first": {"year": "2022", "month": "4", "entity id": "64282", "entity name": "LeConte Energy Storage, LLC", "plant producer type": "IPP", "plant name": "LeConte Energy Storage", "plant state": "CA", "plant id": "64701", "generator id": "LCES", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64701", "date": "2022-04", "mw": 125}, "first_month": "2021-07", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "9", "entity id": "64282", "entity name": "LeConte Energy Storage, LLC", "plant producer type": "IPP", "plant name": "LeConte Energy Storage", "plant state": "CA", "plant id": "64701", "generator id": "LCES", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64701", "date": "2022-09", "mw": 125}, "current_month": "2023-02", "dates": {"first_heard": "2021-07", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "2022-01", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "go_live": "2022-09", "go_live_year_int": 2022, "name": "LeConte Energy Storage", "name_short": "LeConte", "owner": "LeConte Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.67641", "long": "-115.670255", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.67641+-115.670255", "construction_time_month": 8, "construction_speed_mwh_per_month": 31, "no_of_battery_units": 0, "notes_split": ["planning doc is available"], "links": ["https://www.lspower.com/project-map/", "https://ceqanet.opr.ca.gov/2010111056/7"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batterie Diespeck", "city": "", "id": "838", "external_id": "SEE995000682977", "state": "bavaria", "country": "germany", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "838", "external_id": "SEE995000682977", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batterie Diespeck", "external_id": "SEE995000682977", "state": "bavaria", "country": "germany", "mwh": 20, "estimate_mwh": "", "power_mw": 20, "owner": "VERBUND Energy4Business Germany GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": "", "month_disappeared": "", "lat": "49.601219", "long": "10.627815", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5401312"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE995000682977", "DatumLetzteAktualisierung": "2022-10-17T05:49:14.1714465", "LokationMaStRNummer": "SEL913820694963", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-10-17", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1403", "Landkreis": "Neustadt a.d. Aisch-Bad Windsheim", "Gemeinde": "Diespeck", "Gemeindeschluessel": "09575118", "Postleitzahl": "91456", "Strasse": "Gutenstettener Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Diespeck", "Laengengrad": "10.627815", "Breitengrad": "49.601219", "Registrierungsdatum": "2022-10-17", "Inbetriebnahmedatum": "2022-09-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Diespeck", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "20700.000", "Nettonennleistung": "20700.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20700.000", "SpeMastrNummer": "SSE976359478473", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5401312", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 20, "ext_id": "SEE995000682977", "mw": 20, "status": "operation"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE995000682977", "DatumLetzteAktualisierung": "2022-10-17T05:49:14.1714465", "LokationMaStRNummer": "SEL913820694963", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-10-17", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1403", "Landkreis": "Neustadt a.d. Aisch-Bad Windsheim", "Gemeinde": "Diespeck", "Gemeindeschluessel": "09575118", "Postleitzahl": "91456", "Strasse": "Gutenstettener Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Diespeck", "Laengengrad": "10.627815", "Breitengrad": "49.601219", "Registrierungsdatum": "2022-10-17", "Inbetriebnahmedatum": "2022-09-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Diespeck", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "20700.000", "Nettonennleistung": "20700.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20700.000", "SpeMastrNummer": "SSE976359478473", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5401312", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 20, "ext_id": "SEE995000682977", "mw": 20, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": ""}}, "mw": 20, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": "", "month_disappeared": "", "go_live": "2022-09", "go_live_year_int": 2022, "name": "Batterie Diespeck", "name_short": "Batterie Diespeck", "owner": "VERBUND Energy4Business Germany GmbH", "state": "bavaria", "country": "germany", "lat": "49.601219", "long": "10.627815", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.601219+10.627815", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5401312"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lancaster Area Battery", "city": "", "id": "855", "external_id": "66050", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "254", "power_mw": "127", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "855", "external_id": "66050", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lancaster Area Battery", "external_id": "66050", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 254, "power_mw": 127, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LAB": {"first": {"year": "2022", "month": "9", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "Lancaster Area Battery", "plant state": "CA", "plant id": "66050", "generator id": "LAB", "net summer capacity (mw)": "127", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66050", "date": "2022-09", "mw": 127}, "first_month": "2022-11", "changes": [], "current": {"year": "2022", "month": "9", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "Lancaster Area Battery", "plant state": "CA", "plant id": "66050", "generator id": "LAB", "net summer capacity (mw)": "127", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66050", "date": "2022-09", "mw": 127}, "current_month": "2023-02", "dates": {"first_heard": "2022-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 127, "mwh_is_estimate": true, "mwh": 254, "mwh_estimate": 254, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "go_live": "2022-09", "go_live_year_int": 2022, "name": "Lancaster Area Battery", "name_short": "Lancaster Area Battery", "owner": "AES Distributed Energy", "state": "california", "country": "usa", "lat": "40.912677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.912677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sunlight Storage", "city": "", "id": "932", "external_id": "65857", "state": "california", "country": "usa", "capacity_mwh": "920", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Sunlight Storage, LLC", "developer": "NextEra", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.803544", "long": "-115.401622", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/230mw-bess-comes-online-at-bureau-of-land-management-site-in-california/", "link2": "", "link3": "", "link4": ""}, "internal_id": "932", "external_id": "65857", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sunlight Storage", "external_id": "65857", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 460, "power_mw": 230, "owner": "Sunlight Storage, LLC", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SUNS1": {"first": {"year": "2022", "month": "9", "entity id": "65059", "entity name": "Sunlight Storage, LLC", "plant producer type": "IPP", "plant name": "Sunlight Storage", "plant state": "CA", "plant id": "65857", "generator id": "SUNS1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65857", "date": "2022-09", "mw": 230}, "first_month": "2023-02", "changes": [], "current": {"year": "2022", "month": "9", "entity id": "65059", "entity name": "Sunlight Storage, LLC", "plant producer type": "IPP", "plant name": "Sunlight Storage", "plant state": "CA", "plant id": "65857", "generator id": "SUNS1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65857", "date": "2022-09", "mw": 230}, "current_month": "2023-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 230, "mwh_is_estimate": false, "mwh": 920, "mwh_estimate": 460, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "go_live": "2022-09", "go_live_year_int": 2022, "name": "Sunlight Storage", "name_short": "Sunlight", "owner": "Sunlight Storage, LLC", "state": "california", "country": "usa", "lat": "33.803544", "long": "-115.401622", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.803544+-115.401622", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/230mw-bess-comes-online-at-bureau-of-land-management-site-in-california/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arlington Energy Center II", "city": "", "id": "166", "external_id": "64481", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "132", "customer": "", "owner": "Arlington Energy Center II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "166", "external_id": "64481", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arlington Energy Center II", "external_id": "64481", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 264, "power_mw": 132, "owner": "Arlington Energy Center II", "status": "operation", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AEC2B": {"first": {"year": "2022", "month": "8", "entity id": "64144", "entity name": "Arlington Energy Center II", "plant producer type": "IPP", "plant name": "Arlington Energy Center II", "plant state": "CA", "plant id": "64481", "generator id": "AEC2B", "net summer capacity (mw)": "132", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64481", "date": "2022-08", "mw": 132}, "first_month": "2021-04", "changes": [{"month": "2022-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "8", "entity id": "64144", "entity name": "Arlington Energy Center II", "plant producer type": "IPP", "plant name": "Arlington Energy Center II", "plant state": "CA", "plant id": "64481", "generator id": "AEC2B", "net summer capacity (mw)": "132", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64481", "date": "2022-08", "mw": 132}, "current_month": "2023-02", "dates": {"first_heard": "2021-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 132, "mwh_is_estimate": true, "mwh": 264, "mwh_estimate": 264, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2022-08", "start_estimated": "2022-08", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Arlington Energy Center II", "name_short": "Arlington Energy Center II", "owner": "Arlington Energy Center II", "state": "california", "country": "usa", "lat": "41.362343242106384", "long": "-121.37792128258249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.362343242106384+-121.37792128258249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arlington Energy Center III", "city": "", "id": "181", "external_id": "64564", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "94", "power_mw": "47", "customer": "", "owner": "Arlington Energy Center III", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "181", "external_id": "64564", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arlington Energy Center III", "external_id": "64564", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 220, "power_mw": 110, "owner": "Arlington Energy Center III", "status": "operation", "date_first_heard": "2021-05", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AEC3B": {"first": {"year": "2022", "month": "12", "entity id": "64199", "entity name": "Arlington Energy Center III", "plant producer type": "IPP", "plant name": "Arlington Energy Center III", "plant state": "CA", "plant id": "64564", "generator id": "AEC3B", "net summer capacity (mw)": "47", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64564", "date": "2022-12", "mw": 47}, "first_month": "2021-05", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-12", "to": "2022-08", "extra": "accelerated by 4 months", "change_type": "timing"}, {"name": "mw", "from": 47, "to": 110, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "8", "entity id": "64199", "entity name": "Arlington Energy Center III", "plant producer type": "IPP", "plant name": "Arlington Energy Center III", "plant state": "CA", "plant id": "64564", "generator id": "AEC3B", "net summer capacity (mw)": "110", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64564", "date": "2022-08", "mw": 110}, "current_month": "2023-02", "dates": {"first_heard": "2021-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 110, "mwh_is_estimate": true, "mwh": 220, "mwh_estimate": 220, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-05", "start_construction": "", "start_operation": "2022-08", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Arlington Energy Center III", "name_short": "Arlington Energy Center III", "owner": "Arlington Energy Center III", "state": "california", "country": "usa", "lat": "41.17891809297625", "long": "-121.12695671403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17891809297625+-121.12695671403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E1A", "city": "", "id": "186", "external_id": "64878", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "186", "external_id": "64878", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E1A", "external_id": "64878", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 266, "power_mw": 133, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "5", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E1A", "plant state": "CA", "plant id": "64878", "generator id": "BESS", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64878", "date": "2022-05", "mw": 36}, "first_month": "2021-09", "changes": [{"month": "2021-11", "li": [{"name": "mw", "from": 36, "to": 72, "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "mw", "from": 72, "to": 133, "extra": "", "change_type": "misc"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-05", "to": "2022-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "8", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E1A", "plant state": "CA", "plant id": "64878", "generator id": "BESS", "net summer capacity (mw)": "133.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64878", "date": "2022-08", "mw": 133}, "current_month": "2023-02", "dates": {"first_heard": "2021-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 133, "mwh_is_estimate": true, "mwh": 266, "mwh_estimate": 266, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2022-08", "start_estimated": "2022-05", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Edwards Sanborn E1A", "name_short": "Edwards Sanborn E1A", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.40038550275819", "long": "-121.39028196235749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.40038550275819+-121.39028196235749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lister Drive", "city": "", "id": "408", "external_id": "7740", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Arenko Cleantech", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-03-13", "start_construction": "2021-05-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "408", "external_id": "7740", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lister Drive", "external_id": "7740", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Arenko Cleantech / Stratcraft", "status": "operation", "date_first_heard": "2020-03-13", "start_construction": "2021-05-01", "start_operation": "2022-08-01", "start_estimated": "", "month_disappeared": "", "lat": "53.419914", "long": "-2.927592", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7740", "Record Last Updated (dd/mm/yyyy)": "07/05/2021", "Operator (or Applicant)": "Arenko Cleantech", "Site Name": "Lister Drive", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Adjacent to Lister Drive, Carnegie Road, Liverpool, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338451", "Y-coordinate": "391858", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "20F/0335", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/03/2023", "Under Construction": "01/05/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.419914", "long": "-2.927592", "status": "construction", "mw": 49, "ext_id": "7740"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Land Adjacent to Lister Drive, Carnegie Road, Liverpool, Merseyside", "to": "Land Adjacent to Lister Drive, Carnegie Road, Liverpool, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/05/2021", "to": "17/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/05/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "04/01/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Arenko Cleantech", "to": "Arenko Cleantech / Stratcraft", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/08/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7740", "Record Last Updated (dd/mm/yyyy)": "04/01/2023", "Operator (or Applicant)": "Arenko Cleantech / Stratcraft", "Site Name": "Lister Drive", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent to Lister Drive, Carnegie Road, Liverpool, ", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338451", "Y-coordinate": "391858", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "20F/0335", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/03/2023", "Under Construction": "01/05/2021", "Operational": "01/08/2022", "Heat Network Ref": "", "lat": "53.419914", "long": "-2.927592", "status": "operation", "mw": 49, "ext_id": "7740"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-07", "start_construction": "", "start_operation": "2023-01-04"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-03-13", "start_construction": "2021-05-01", "start_operation": "2022-08-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Lister Drive", "name_short": "Lister Drive", "owner": "Arenko Cleantech / Stratcraft", "state": "north west", "country": "uk", "lat": "53.419914", "long": "-2.927592", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419914+-2.927592", "construction_time_month": 15, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Swoose II", "city": "", "id": "941", "external_id": "66008", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "202", "power_mw": "101", "customer": "", "owner": "Swoose II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "941", "external_id": "66008", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Swoose II", "external_id": "66008", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 202, "power_mw": 101, "owner": "Swoose II", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "8", "entity id": "65183", "entity name": "Swoose II", "plant producer type": "IPP", "plant name": "Swoose II", "plant state": "TX", "plant id": "66008", "generator id": "BA", "net summer capacity (mw)": "101", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66008", "date": "2022-08", "mw": 101}, "first_month": "2023-02", "changes": [], "current": {"year": "2022", "month": "8", "entity id": "65183", "entity name": "Swoose II", "plant producer type": "IPP", "plant name": "Swoose II", "plant state": "TX", "plant id": "66008", "generator id": "BA", "net summer capacity (mw)": "101", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66008", "date": "2022-08", "mw": 101}, "current_month": "2023-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 101, "mwh_is_estimate": true, "mwh": 202, "mwh_estimate": 202, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Swoose II", "name_short": "Swoose II", "owner": "Swoose II", "state": "texas", "country": "usa", "lat": "33.48557373342624", "long": "-95.17643023533789", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.48557373342624+-95.17643023533789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Docordova", "city": "Hood County", "id": "38", "external_id": "8063", "state": "texas", "country": "usa", "capacity_mwh": "260", "estimate_mwh": "", "power_mw": "260", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.430077", "long": "-97.695028", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://urjadaily.com/vistra-brings-worlds-largest-utility-scale-battery-energy-storage-system-online/", "link2": "", "link3": "", "link4": ""}, "internal_id": "38", "external_id": "8063", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "DeCordova Steam Electric Station", "external_id": "8063", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 520, "power_mw": 260, "owner": "Luminant Generation Company LLC", "status": "operation", "date_first_heard": "2020-11", "start_construction": "2021-12", "start_operation": "2022-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2021", "month": "7", "entity id": "55983", "entity name": "Luminant Generation Company LLC", "plant producer type": "IPP", "plant name": "DeCordova Steam Electric Station", "plant state": "TX", "plant id": "8063", "generator id": "BESS", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "8063", "date": "2021-07", "mw": 260}, "first_month": "2020-11", "changes": [{"month": "2021-02", "li": [{"name": "date", "from": "2021-07", "to": "2022-02", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "date", "from": "2022-02", "to": "2022-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "7", "entity id": "55983", "entity name": "Luminant Generation Company LLC", "plant producer type": "IPP", "plant name": "DeCordova Steam Electric Station", "plant state": "TX", "plant id": "8063", "generator id": "BESS", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "8063", "date": "2022-07", "mw": 260}, "current_month": "2023-02", "dates": {"first_heard": "2020-11", "start_construction": "2021-12"}, "month_disappeared": ""}}, "mw": 260, "mwh_is_estimate": false, "mwh": 260, "mwh_estimate": 520, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-11", "start_construction": "2021-12", "start_operation": "2022-07", "start_estimated": "2022", "month_disappeared": "", "go_live": "2022-07", "go_live_year_int": 2022, "name": "DeCordova Steam Electric Station", "name_short": "DeCordova Steam Electric Station", "owner": "Luminant Generation Company LLC", "state": "texas", "country": "usa", "lat": "32.430077", "long": "-97.695028", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.430077+-97.695028", "construction_time_month": 7, "construction_speed_mwh_per_month": 37, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://urjadaily.com/vistra-brings-worlds-largest-utility-scale-battery-energy-storage-system-online/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn S1", "city": "", "id": "554", "external_id": "64929", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "554", "external_id": "64929", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn S1", "external_id": "64929", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 84, "power_mw": 42, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "3", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S1", "plant state": "CA", "plant id": "64929", "generator id": "BESS", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64929", "date": "2022-03", "mw": 11}, "first_month": "2021-11", "changes": [{"month": "2022-02", "li": [{"name": "mw", "from": 11, "to": 42, "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "7", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S1", "plant state": "CA", "plant id": "64929", "generator id": "BESS", "net summer capacity (mw)": "42.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64929", "date": "2022-07", "mw": 42}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 42, "mwh_is_estimate": true, "mwh": 84, "mwh_estimate": 84, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-07", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2022-07", "go_live_year_int": 2022, "name": "Edwards Sanborn S1", "name_short": "Edwards Sanborn S1", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "40.94387837493652", "long": "-121.3581441949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94387837493652+-121.3581441949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn S3", "city": "", "id": "572", "external_id": "64928", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "35", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "572", "external_id": "64928", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn S3", "external_id": "64928", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 70, "power_mw": 35, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "3", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S3", "plant state": "CA", "plant id": "64928", "generator id": "BESS", "net summer capacity (mw)": "35.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64928", "date": "2022-03", "mw": 35}, "first_month": "2022-02", "changes": [{"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "7", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S3", "plant state": "CA", "plant id": "64928", "generator id": "BESS", "net summer capacity (mw)": "35.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64928", "date": "2022-07", "mw": 35}, "current_month": "2023-02", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 35, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-07", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2022-07", "go_live_year_int": 2022, "name": "Edwards Sanborn S3", "name_short": "Edwards Sanborn S3", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.01452451357819", "long": "-121.448908126965", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01452451357819+-121.448908126965", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mililani South Solar Farm", "city": "", "id": "574", "external_id": "57242", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "78", "power_mw": "39", "customer": "", "owner": "Mililani I Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "574", "external_id": "57242", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mililani South Solar Farm", "external_id": "57242", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 78, "power_mw": 39, "owner": "Mililani I Solar LLC", "status": "operation", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"2": {"first": {"year": "2022", "month": "7", "entity id": "62893", "entity name": "Mililani I Solar LLC", "plant producer type": "IPP", "plant name": "Mililani South Solar Farm", "plant state": "HI", "plant id": "57242", "generator id": "2", "net summer capacity (mw)": "39", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "57242", "date": "2022-07", "mw": 39}, "first_month": "2022-02", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-07", "to": "2022-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-09", "to": "2022-07", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "7", "entity id": "62893", "entity name": "Mililani I Solar LLC", "plant producer type": "IPP", "plant name": "Mililani South Solar Farm", "plant state": "HI", "plant id": "57242", "generator id": "2", "net summer capacity (mw)": "39", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57242", "date": "2022-07", "mw": 39}, "current_month": "2023-02", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 39, "mwh_is_estimate": true, "mwh": 78, "mwh_estimate": 78, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-07", "start_estimated": "2022-07", "month_disappeared": "", "go_live": "2022-07", "go_live_year_int": 2022, "name": "Mililani South Solar Farm", "name_short": "Mililani South Solar Farm", "owner": "Mililani I Solar LLC", "state": "hawaii", "country": "usa", "lat": "19.395004114284703", "long": "-155.58399087471747", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.395004114284703+-155.58399087471747", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hickory Park", "city": "Mitchell County", "id": "43", "external_id": "63522", "state": "georgia", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "40", "customer": "RWE Renewables", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "GridSolv Quantum", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-11-17", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.31621", "long": "-84.124752", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "2021: 30 year PPA with Georgia Power", "project_website": "", "link1": "https://www.energy-storage.news/lg-energy-solution-supplying-800mwh-battery-storage-for-rwes-us-solar-plus-storage-projects/", "link2": "https://www.rwe.com/en/press/rwe-renewables/2020-11-17-rwes-hickory-park-solar-project-with-co-located-storage-facility-under-construction", "link3": "", "link4": ""}, "internal_id": "43", "external_id": "63522", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hickory Park Solar Hybrid", "external_id": "63522", "state": "georgia", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "RWE Renewables Americas LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HPBAT": {"first": {"year": "2021", "month": "11", "entity id": "56215", "entity name": "RWE Renewables Americas LLC", "plant producer type": "IPP", "plant name": "Hickory Park Solar Hybrid", "plant state": "GA", "plant id": "63522", "generator id": "HPBAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63522", "date": "2021-11", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "56215", "entity name": "RWE Renewables Americas LLC", "plant producer type": "IPP", "plant name": "Hickory Park Solar Hybrid", "plant state": "GA", "plant id": "63522", "generator id": "HPBAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63522", "date": "2022-06", "mw": 40}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Hickory Park Solar Hybrid", "name_short": "Hickory Park Solar", "owner": "RWE Renewables Americas LLC", "state": "georgia", "country": "usa", "lat": "31.31621", "long": "-84.124752", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.31621+-84.124752", "construction_time_month": 10, "construction_speed_mwh_per_month": 8, "no_of_battery_units": 0, "notes_split": ["2021: 30 year PPA with Georgia Power"], "links": ["https://www.energy-storage.news/lg-energy-solution-supplying-800mwh-battery-storage-for-rwes-us-solar-plus-storage-projects/", "https://www.rwe.com/en/press/rwe-renewables/2020-11-17-rwes-hickory-park-solar-project-with-co-located-storage-facility-under-construction"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Luna Storage", "city": "", "id": "170", "external_id": "63685", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Luna Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "170", "external_id": "63685", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Luna Storage", "external_id": "63685", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LUNA": {"first": {"year": "2021", "month": "7", "entity id": "63403", "entity name": "Luna Storage, LLC", "plant producer type": "IPP", "plant name": "Luna Storage", "plant state": "CA", "plant id": "63685", "generator id": "LUNA", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63685", "date": "2021-07", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-07", "to": "2021-10", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2022-04", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "entity id", "from": "63403", "to": "61012", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Luna Storage, LLC", "to": "AES Distributed Energy", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "Luna Storage", "plant state": "CA", "plant id": "63685", "generator id": "LUNA", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63685", "date": "2022-06", "mw": 100}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-04"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2022-06", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Luna Storage", "name_short": "Luna", "owner": "AES Distributed Energy", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.440049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.440049", "construction_time_month": 14, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Maverick Solar 6, LLC", "city": "", "id": "179", "external_id": "64105", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Maverick Solar 6, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "179", "external_id": "64105", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Maverick Solar 6, LLC", "external_id": "64105", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Maverick Solar 6, LLC", "status": "operation", "date_first_heard": "2020-12", "start_construction": "2021-02", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MAV04": {"first": {"year": "2021", "month": "12", "entity id": "63733", "entity name": "Maverick Solar 6, LLC", "plant producer type": "IPP", "plant name": "Maverick Solar 6, LLC", "plant state": "CA", "plant id": "64105", "generator id": "MAV04", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64105", "date": "2021-12", "mw": 50}, "first_month": "2020-12", "changes": [{"month": "2021-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-12", "to": "2022-05", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "63733", "entity name": "Maverick Solar 6, LLC", "plant producer type": "IPP", "plant name": "Maverick Solar 6, LLC", "plant state": "CA", "plant id": "64105", "generator id": "MAV04", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64105", "date": "2022-06", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2020-12", "start_construction": "2021-02"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-12", "start_construction": "2021-02", "start_operation": "2022-06", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Maverick Solar 6, LLC", "name_short": "Maverick Solar 6", "owner": "Maverick Solar 6, LLC", "state": "california", "country": "usa", "lat": "41.01822925590127", "long": "-120.97859189749224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01822925590127+-120.97859189749224", "construction_time_month": 16, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Azure Sky Solar", "city": "", "id": "249", "external_id": "63905", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "154", "power_mw": "77", "customer": "", "owner": "Azure Sky Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "249", "external_id": "63905", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Azure Sky Solar", "external_id": "63905", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 154, "power_mw": 77, "owner": "Azure Sky Solar Project, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ASKYB": {"first": {"year": "2021", "month": "8", "entity id": "63571", "entity name": "Azure Sky Solar Project, LLC", "plant producer type": "IPP", "plant name": "Azure Sky Solar", "plant state": "TX", "plant id": "63905", "generator id": "ASKYB", "net summer capacity (mw)": "77", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63905", "date": "2021-08", "mw": 77}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "63571", "entity name": "Azure Sky Solar Project, LLC", "plant producer type": "IPP", "plant name": "Azure Sky Solar", "plant state": "TX", "plant id": "63905", "generator id": "ASKYB", "net summer capacity (mw)": "77", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63905", "date": "2022-06", "mw": 77}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 77, "mwh_is_estimate": true, "mwh": 154, "mwh_estimate": 154, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2022-06", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Azure Sky Solar", "name_short": "Azure Sky Solar", "owner": "Azure Sky Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.539960724436234", "long": "-95.53783171153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.539960724436234+-95.53783171153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Santa Ana Storage 2", "city": "", "id": "552", "external_id": "64921", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "552", "external_id": "64921", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Santa Ana Storage 2", "external_id": "64921", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Johanna Energy Center, LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SAP2": {"first": {"year": "2022", "month": "4", "entity id": "63522", "entity name": "Johanna Energy Center, LLC", "plant producer type": "IPP", "plant name": "Santa Ana Storage 2", "plant state": "CA", "plant id": "64921", "generator id": "SAP2", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64921", "date": "2022-04", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "63522", "entity name": "Johanna Energy Center, LLC", "plant producer type": "IPP", "plant name": "Santa Ana Storage 2", "plant state": "CA", "plant id": "64921", "generator id": "SAP2", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64921", "date": "2022-06", "mw": 20}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-06", "start_estimated": "2022-04", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Santa Ana Storage 2", "name_short": "Santa Ana Storage 2", "owner": "Johanna Energy Center, LLC", "state": "california", "country": "usa", "lat": "41.03803592366989", "long": "-121.41654744719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.03803592366989+-121.41654744719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crossett Power Management LLC", "city": "", "id": "938", "external_id": "66009", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "406", "power_mw": "203", "customer": "", "owner": "Crossett Power Management LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "938", "external_id": "66009", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Crossett Power Management LLC", "external_id": "66009", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 406, "power_mw": 203, "owner": "Crossett Power Management LLC", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "6", "entity id": "65184", "entity name": "Crossett Power Management LLC", "plant producer type": "IPP", "plant name": "Crossett Power Management LLC", "plant state": "TX", "plant id": "66009", "generator id": "BA", "net summer capacity (mw)": "203", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66009", "date": "2022-06", "mw": 203}, "first_month": "2023-02", "changes": [], "current": {"year": "2022", "month": "6", "entity id": "65184", "entity name": "Crossett Power Management LLC", "plant producer type": "IPP", "plant name": "Crossett Power Management LLC", "plant state": "TX", "plant id": "66009", "generator id": "BA", "net summer capacity (mw)": "203", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66009", "date": "2022-06", "mw": 203}, "current_month": "2023-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 203, "mwh_is_estimate": true, "mwh": 406, "mwh_estimate": 406, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Crossett Power Management LLC", "name_short": "Crossett Power Management", "owner": "Crossett Power Management LLC", "state": "texas", "country": "usa", "lat": "33.31533668045898", "long": "-95.0825099893275", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.31533668045898+-95.0825099893275", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Outer Cape Community Battery", "city": "", "id": "220", "external_id": "62604", "state": "massachusetts", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Eversource", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "220", "external_id": "62604", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Outer Cape Community Battery", "external_id": "62604", "state": "massachusetts", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Eversource", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OCESS": {"first": {"year": "2021", "month": "3", "entity id": "59497", "entity name": "Eversource", "plant producer type": "IPP", "plant name": "Outer Cape Community Battery", "plant state": "MA", "plant id": "62604", "generator id": "OCESS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62604", "date": "2021-03", "mw": 25}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-05", "li": [{"name": "date", "from": "2021-03", "to": "2021-09", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-12", "to": "2022-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-06", "to": "2022-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2022", "month": "5", "entity id": "59497", "entity name": "Eversource", "plant producer type": "IPP", "plant name": "Outer Cape Community Battery", "plant state": "MA", "plant id": "62604", "generator id": "OCESS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62604", "date": "2022-05", "mw": 25}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-12"}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-05", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2022-05", "go_live_year_int": 2022, "name": "Outer Cape Community Battery", "name_short": "Outer Cape Community Battery", "owner": "Eversource", "state": "massachusetts", "country": "usa", "lat": "42.571152", "long": "-71.761147", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.571152+-71.761147", "construction_time_month": 17, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wishaw 49.9 Battery Storage Facility", "city": "", "id": "509", "external_id": "9522", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Spectrum Reserve Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "509", "external_id": "9522", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wishaw Battery Storage Facility", "external_id": "9522", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Zenobe Energy", "status": "operation", "date_first_heard": "2020-09-24", "start_construction": "2022-04-01", "start_operation": "2022-05-10", "start_estimated": "", "month_disappeared": "", "lat": "55.769111", "long": "-3.938428", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9522", "Record Last Updated (dd/mm/yyyy)": "01/09/2021", "Operator (or Applicant)": "Spectrum Reserve Limited", "Site Name": "Wishaw 49.9 Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Netherton Street Netherton Wishaw", "County": "Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML2 0DP", "X-coordinate": "278488", "Y-coordinate": "654565", "Planning Authority": "North Lanarkshire Council", "Planning Application Reference": "20/00946/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/09/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.769111", "long": "-3.938428", "status": "planning", "mw": 49, "ext_id": "9522"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/09/2021", "to": "10/05/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Operator (or Applicant)", "from": "Spectrum Reserve Limited", "to": "Zenobe Energy", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Wishaw 49.9 Battery Storage Facility", "to": "Wishaw Battery Storage Facility", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9522", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Wishaw Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Netherton Street Netherton Wishaw", "County": "Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML2 0DP", "X-coordinate": "278488", "Y-coordinate": "654565", "Planning Authority": "North Lanarkshire Council", "Planning Application Reference": "20/00946/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/09/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2022", "Operational": "", "Heat Network Ref": "", "lat": "55.769111", "long": "-3.938428", "status": "operation", "mw": 49, "ext_id": "9522"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-01", "start_construction": "2022-05-10", "start_operation": "2022-05-10"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09-24", "start_construction": "2022-04-01", "start_operation": "2022-05-10", "start_estimated": "", "month_disappeared": "", "go_live": "2022-05", "go_live_year_int": 2022, "name": "Wishaw Battery Storage Facility", "name_short": "Wishaw", "owner": "Zenobe Energy", "state": "scotland", "country": "uk", "lat": "55.769111", "long": "-3.938428", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.769111+-3.938428", "construction_time_month": 1, "construction_speed_mwh_per_month": 49, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Moss landing / Elkhorn", "city": "close to santa cruz", "id": "7", "external_id": "62564", "state": "california", "country": "usa", "capacity_mwh": "730", "estimate_mwh": "", "power_mw": "182", "customer": "PG&E", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "256", "status": "operation", "date_first_heard": "", "start_construction": "2020-07-01", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.807971", "long": "-121.781701", "coords_hint": "1", "use_case": "", "notes": "in 2020, 64mwh were added", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "link2": "https://en.wikipedia.org/wiki/Tesla_Megapack", "link3": "", "link4": ""}, "internal_id": "7", "external_id": "62564", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elkhorn Battery Energy Storage System", "external_id": "62564", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 364, "power_mw": 182, "owner": "Pacific Gas & Electric Co.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELKHO": {"first": {"year": "2021", "month": "3", "entity id": "14328", "entity name": "Pacific Gas & Electric Co.", "plant producer type": "Electric Utility", "plant name": "Elkhorn Battery Energy Storage System", "plant state": "CA", "plant id": "62564", "generator id": "ELKHO", "net summer capacity (mw)": "182.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62564", "date": "2021-03", "mw": 182}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-03", "to": "2021-07", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "14328", "entity name": "Pacific Gas & Electric Co.", "plant producer type": "Electric Utility", "plant name": "Elkhorn Battery Energy Storage System", "plant state": "CA", "plant id": "62564", "generator id": "ELKHO", "net summer capacity (mw)": "182.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62564", "date": "2022-04", "mw": 182}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-12"}, "month_disappeared": ""}}, "mw": 182, "mwh_is_estimate": false, "mwh": 730, "mwh_estimate": 364, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Elkhorn Battery Energy Storage System", "name_short": "Elkhorn Battery", "owner": "Pacific Gas & Electric Co.", "state": "california", "country": "usa", "lat": "36.807971", "long": "-121.781701", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.807971+-121.781701", "construction_time_month": 16, "construction_speed_mwh_per_month": 45, "no_of_battery_units": 256, "notes_split": ["in 2020, 64mwh were added"], "links": ["https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "https://en.wikipedia.org/wiki/Tesla_Megapack"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Diablo", "city": "Pittsburg", "id": "47", "external_id": "62175", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "LS Power / PG & E", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-30", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.015262", "long": "-121.846146", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/direct-energy-business-to-use-some-of-worlds-biggest-battery-projects-to-serve-california-customers/", "link2": "https://www.lspower.com/project-map/", "link3": "https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21131879/pge-poised-to-expand-battery-energy-storage-capacity-by-more-than-420-mw", "link4": ""}, "internal_id": "47", "external_id": "62175", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Diablo Energy Storage", "external_id": "62175", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Diablo Energy Storage, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-05", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DIBLO": {"first": {"year": "2021", "month": "8", "entity id": "61684", "entity name": "Diablo Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Diablo Energy Storage", "plant state": "CA", "plant id": "62175", "generator id": "DIBLO", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62175", "date": "2021-08", "mw": 250}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "mw", "from": 250, "to": 200, "extra": "", "change_type": "misc"}]}, {"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2022-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "61684", "entity name": "Diablo Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Diablo Energy Storage", "plant state": "CA", "plant id": "62175", "generator id": "DIBLO", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62175", "date": "2022-04", "mw": 200}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-05"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-05", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Diablo Energy Storage", "name_short": "Diablo", "owner": "Diablo Energy Storage, LLC", "state": "california", "country": "usa", "lat": "38.015262", "long": "-121.846146", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.015262+-121.846146", "construction_time_month": 11, "construction_speed_mwh_per_month": 72, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/direct-energy-business-to-use-some-of-worlds-biggest-battery-projects-to-serve-california-customers/", "https://www.lspower.com/project-map/", "https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21131879/pge-poised-to-expand-battery-energy-storage-capacity-by-more-than-420-mw"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coso", "city": "Coso Junction, Little Lake", "id": "117", "external_id": "63943", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "60", "customer": "", "owner": "Arevon", "developer": "Arevon", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.056513", "long": "-117.858611", "coords_hint": "0", "use_case": "", "notes": "took the location from arevon website, but on google maps satellite seems like an unlikely location, this project is most likely tesla given that arevon has signed a large deal with tesla", "project_website": "https://arevonenergy.com/location/coso/", "link1": "https://arevonenergy.com/arevon-signs-agreement-for-2-gw-6-gwh-of-tesla-megapack-systems/", "link2": "", "link3": "", "link4": ""}, "internal_id": "117", "external_id": "63943", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Coso Battery Storage", "external_id": "63943", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Arevon Asset Management", "status": "operation", "date_first_heard": "2020-10", "start_construction": "2021-05", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61730": {"first": {"year": "2021", "month": "6", "entity id": "63611", "entity name": "Coso Battery Storage LLC", "plant producer type": "IPP", "plant name": "Coso Battery Storage", "plant state": "CA", "plant id": "63943", "generator id": "61730", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63943", "date": "2021-06", "mw": 60}, "first_month": "2020-10", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-06", "to": "2021-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "entity id", "from": "63611", "to": "64172", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Coso Battery Storage LLC", "to": "Arevon Asset Management", "extra": "", "change_type": "misc"}]}, {"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-08", "to": "2021-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "64172", "entity name": "Arevon Asset Management", "plant producer type": "IPP", "plant name": "Coso Battery Storage", "plant state": "CA", "plant id": "63943", "generator id": "61730", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63943", "date": "2022-04", "mw": 60}, "current_month": "2023-02", "dates": {"first_heard": "2020-10", "start_construction": "2021-05"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": false, "mwh": 240, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10", "start_construction": "2021-05", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Coso Battery Storage", "name_short": "Coso", "owner": "Arevon Asset Management", "state": "california", "country": "usa", "lat": "36.056513", "long": "-117.858611", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.056513+-117.858611", "construction_time_month": 11, "construction_speed_mwh_per_month": 21, "no_of_battery_units": 0, "notes_split": ["took the location from arevon website, but on google maps satellite seems like an unlikely location, this project is most likely tesla given that arevon has signed a large deal with tesla"], "links": ["https://arevonenergy.com/arevon-signs-agreement-for-2-gw-6-gwh-of-tesla-megapack-systems/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Slate Hybrid", "city": "", "id": "177", "external_id": "63727", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "RE Slate 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "177", "external_id": "63727", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Slate Hybrid", "external_id": "63727", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 278, "power_mw": 139, "owner": "MN8 Energy LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-03", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"SLBES": {"first": {"year": "2020", "month": "12", "entity id": "62780", "entity name": "RE Slate LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBES", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63727", "date": "2020-12", "mw": 300}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "date", "from": "2020-12", "to": "2021-10", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2021-03", "li": [{"name": "entity name", "from": "RE Slate LLC", "to": "RE Slate 1 LLC", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-10", "to": "2022-03", "extra": "delayed by 5 months", "change_type": "timing"}, {"name": "mw", "from": 300, "to": 50, "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "entity id", "from": "62780", "to": "61944", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "RE Slate 1 LLC", "to": "Goldman Sachs Renewable Power Group", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power Group", "to": "Goldman Sachs Renewable Power LLC", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power LLC", "to": "MN8 Energy LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "61944", "entity name": "MN8 Energy LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBES", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63727", "date": "2022-04", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-03"}, "month_disappeared": ""}, "SLBSV": {"first": {"year": "2021", "month": "11", "entity id": "62780", "entity name": "RE Slate 1 LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBSV", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63727", "date": "2021-11", "mw": 46}, "first_month": "2021-03", "changes": [{"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "entity id", "from": "62780", "to": "61944", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "RE Slate 1 LLC", "to": "Goldman Sachs Renewable Power Group", "extra": "", "change_type": "misc"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-11", "to": "2022-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power Group", "to": "Goldman Sachs Renewable Power LLC", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power LLC", "to": "MN8 Energy LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "2", "entity id": "61944", "entity name": "MN8 Energy LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBSV", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63727", "date": "2022-02", "mw": 46}, "current_month": "2023-02", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}, "SLB3C": {"first": {"year": "2021", "month": "12", "entity id": "62780", "entity name": "RE Slate 1 LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLB3C", "net summer capacity (mw)": "33.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63727", "date": "2021-12", "mw": 33}, "first_month": "2021-03", "changes": [{"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "entity id", "from": "62780", "to": "61944", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "RE Slate 1 LLC", "to": "Goldman Sachs Renewable Power Group", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power Group", "to": "Goldman Sachs Renewable Power LLC", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power LLC", "to": "MN8 Energy LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "61944", "entity name": "MN8 Energy LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLB3C", "net summer capacity (mw)": "33.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63727", "date": "2022-03", "mw": 33}, "current_month": "2023-02", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}, "SLBPW": {"first": {"year": "2022", "month": "1", "entity id": "62780", "entity name": "RE Slate 1 LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBPW", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63727", "date": "2022-01", "mw": 10}, "first_month": "2021-03", "changes": [{"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "entity id", "from": "62780", "to": "61944", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "RE Slate 1 LLC", "to": "Goldman Sachs Renewable Power Group", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power Group", "to": "Goldman Sachs Renewable Power LLC", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power LLC", "to": "MN8 Energy LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "61944", "entity name": "MN8 Energy LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBPW", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63727", "date": "2022-03", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 139, "mwh_is_estimate": true, "mwh": 278, "mwh_estimate": 278, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-03", "start_operation": "2022-04", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Slate Hybrid", "name_short": "Slate", "owner": "MN8 Energy LLC", "state": "california", "country": "usa", "lat": "40.88482600365377", "long": "-121.12724013582601", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.88482600365377+-121.12724013582601", "construction_time_month": 13, "construction_speed_mwh_per_month": 21, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E2", "city": "", "id": "188", "external_id": "64879", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "188", "external_id": "64879", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E2", "external_id": "64879", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 244, "power_mw": 122, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2021", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E2", "plant state": "CA", "plant id": "64879", "generator id": "BESS", "net summer capacity (mw)": "33", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64879", "date": "2021-12", "mw": 33}, "first_month": "2021-09", "changes": [{"month": "2021-11", "li": [{"name": "mw", "from": 33, "to": 66, "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 66, "to": 122, "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E2", "plant state": "CA", "plant id": "64879", "generator id": "BESS", "net summer capacity (mw)": "122.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64879", "date": "2022-04", "mw": 122}, "current_month": "2023-02", "dates": {"first_heard": "2021-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 122, "mwh_is_estimate": true, "mwh": 244, "mwh_estimate": 244, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2022-04", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Edwards Sanborn E2", "name_short": "Edwards Sanborn E2", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.320172844770276", "long": "-121.57187871010998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.320172844770276+-121.57187871010998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batterie Eisenach", "city": "", "id": "678", "external_id": "SEE982806373970", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "678", "external_id": "SEE982806373970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batterie Eisenach", "external_id": "SEE982806373970", "state": "thuringia", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "VERBUND Energy4Business Germany GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "", "month_disappeared": "", "lat": "50.978959", "long": "10.292710", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5001456"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE982806373970", "DatumLetzteAktualisierung": "2022-04-26T05:50:01.7340442", "LokationMaStRNummer": "SEL901500514236", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-04-26", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1415", "Landkreis": "Eisenach", "Gemeinde": "Eisenach", "Gemeindeschluessel": "16056000", "Postleitzahl": "99817", "Strasse": "Adam-Opel-Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "15", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Eisenach", "Laengengrad": "10.292710", "Breitengrad": "50.978959", "Registrierungsdatum": "2022-04-26", "Inbetriebnahmedatum": "2022-04-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Eisenach", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "10350.000", "Nettonennleistung": "10350.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10350.000", "SpeMastrNummer": "SSE916426432625", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5001456", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 10, "ext_id": "SEE982806373970", "mw": 10, "status": "operation"}, "first_month": "2022-05", "changes": [], "current": {"EinheitMastrNummer": "SEE982806373970", "DatumLetzteAktualisierung": "2022-04-26T05:50:01.7340442", "LokationMaStRNummer": "SEL901500514236", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-04-26", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1415", "Landkreis": "Eisenach", "Gemeinde": "Eisenach", "Gemeindeschluessel": "16056000", "Postleitzahl": "99817", "Strasse": "Adam-Opel-Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "15", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Eisenach", "Laengengrad": "10.292710", "Breitengrad": "50.978959", "Registrierungsdatum": "2022-04-26", "Inbetriebnahmedatum": "2022-04-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Eisenach", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "10350.000", "Nettonennleistung": "10350.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10350.000", "SpeMastrNummer": "SSE916426432625", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5001456", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 10, "ext_id": "SEE982806373970", "mw": 10, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Batterie Eisenach", "name_short": "Batterie Eisenach", "owner": "VERBUND Energy4Business Germany GmbH", "state": "thuringia", "country": "germany", "lat": "50.978959", "long": "10.292710", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.978959+10.292710", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5001456"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Anode (Springville) BESS", "city": "", "id": "679", "external_id": "65458", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "679", "external_id": "65458", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Anode (Springville) BESS", "external_id": "65458", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 448, "power_mw": 224, "owner": "Southern California Edison Co", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2022-05", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"ANOD1": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Anode (Springville) BESS", "plant state": "CA", "plant id": "65458", "generator id": "ANOD1", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65458", "date": "2022-08", "mw": 112}, "first_month": "2022-04", "changes": [{"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-04", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-05", "to": "2023-11", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-11", "to": "2024-06", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Anode (Springville) BESS", "plant state": "CA", "plant id": "65458", "generator id": "ANOD1", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65458", "date": "2024-07", "mw": 112}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-05"}, "month_disappeared": ""}, "ANOD2": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Anode (Springville) BESS", "plant state": "CA", "plant id": "65458", "generator id": "ANOD2", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65458", "date": "2022-08", "mw": 112}, "first_month": "2022-04", "changes": [{"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-04", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-05", "to": "2023-11", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-11", "to": "2024-06", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Anode (Springville) BESS", "plant state": "CA", "plant id": "65458", "generator id": "ANOD2", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65458", "date": "2024-07", "mw": 112}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-05"}, "month_disappeared": ""}}, "mw": 224, "mwh_is_estimate": true, "mwh": 448, "mwh_estimate": 448, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2022-05", "start_operation": "2022-04-08", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Anode (Springville) BESS", "name_short": "Anode (Springville)", "owner": "Southern California Edison Co", "state": "california", "country": "usa", "lat": "41.01822925590127", "long": "-120.97859189749224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01822925590127+-120.97859189749224", "construction_time_month": -1, "construction_speed_mwh_per_month": -448, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Separator (Etiwanda) BESS", "city": "", "id": "680", "external_id": "65456", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "680", "external_id": "65456", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Separator (Etiwanda) BESS", "external_id": "65456", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 224, "power_mw": 112, "owner": "Southern California Edison Co", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2022-05", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SEPAR": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Separator (Etiwanda) BESS", "plant state": "CA", "plant id": "65456", "generator id": "SEPAR", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65456", "date": "2022-08", "mw": 112}, "first_month": "2022-04", "changes": [{"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-03", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Separator (Etiwanda) BESS", "plant state": "CA", "plant id": "65456", "generator id": "SEPAR", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65456", "date": "2024-06", "mw": 112}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-05"}, "month_disappeared": ""}}, "mw": 112, "mwh_is_estimate": true, "mwh": 224, "mwh_estimate": 224, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2022-05", "start_operation": "2022-04-08", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Separator (Etiwanda) BESS", "name_short": "Separator (Etiwanda)", "owner": "Southern California Edison Co", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.140049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.140049", "construction_time_month": -1, "construction_speed_mwh_per_month": -224, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Flower Valley II", "city": "", "id": "940", "external_id": "66007", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "202", "power_mw": "101", "customer": "", "owner": "Flower Valley II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "940", "external_id": "66007", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Flower Valley II", "external_id": "66007", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 202, "power_mw": 101, "owner": "Flower Valley II", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "4", "entity id": "65182", "entity name": "Flower Valley II", "plant producer type": "IPP", "plant name": "Flower Valley II", "plant state": "TX", "plant id": "66007", "generator id": "BA", "net summer capacity (mw)": "101", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66007", "date": "2022-04", "mw": 101}, "first_month": "2023-02", "changes": [], "current": {"year": "2022", "month": "4", "entity id": "65182", "entity name": "Flower Valley II", "plant producer type": "IPP", "plant name": "Flower Valley II", "plant state": "TX", "plant id": "66007", "generator id": "BA", "net summer capacity (mw)": "101", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66007", "date": "2022-04", "mw": 101}, "current_month": "2023-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 101, "mwh_is_estimate": true, "mwh": 202, "mwh_estimate": 202, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Flower Valley II", "name_short": "Flower Valley II", "owner": "Flower Valley II", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.193438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.193438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tranquility Storage Retrofit", "city": "Cantua Creek", "id": "69", "external_id": "59939", "state": "california", "country": "usa", "capacity_mwh": "288", "estimate_mwh": "", "power_mw": "72", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Powin", "type": "", "cells": "Mitsubishi", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-05-01", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.591626", "long": "-120.404965", "coords_hint": "1", "use_case": "200 MW solar farm support", "notes": "LFP batteries", "project_website": "", "link1": "https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "link2": "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref", "link3": "", "link4": ""}, "internal_id": "69", "external_id": "59939", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "RE Tranquillity", "external_id": "59939", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 144, "power_mw": 72, "owner": "Southern Power Co", "status": "operation", "date_first_heard": "2021-03", "start_construction": "2021-05", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2021", "month": "10", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Tranquillity", "plant state": "CA", "plant id": "59939", "generator id": "BESS1", "net summer capacity (mw)": "72", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "59939", "date": "2021-10", "mw": 72}, "first_month": "2021-03", "changes": [{"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 72, "to": 37, "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Tranquillity", "plant state": "CA", "plant id": "59939", "generator id": "BESS1", "net summer capacity (mw)": "37", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59939", "date": "2021-11", "mw": 37}, "current_month": "2022-02", "dates": {"first_heard": "2021-03", "start_construction": "2021-05"}, "month_disappeared": ""}, "BESS2": {"first": {"year": "2022", "month": "2", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Tranquillity", "plant state": "CA", "plant id": "59939", "generator id": "BESS2", "net summer capacity (mw)": "35", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "59939", "date": "2022-02", "mw": 35}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Tranquillity", "plant state": "CA", "plant id": "59939", "generator id": "BESS2", "net summer capacity (mw)": "35", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59939", "date": "2022-03", "mw": 35}, "current_month": "2023-02", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 72, "mwh_is_estimate": false, "mwh": 288, "mwh_estimate": 144, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-03", "start_construction": "2021-05", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "RE Tranquillity", "name_short": "RE Tranquillity", "owner": "Southern Power Co", "state": "california", "country": "usa", "lat": "36.591626", "long": "-120.404965", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.591626+-120.404965", "construction_time_month": 10, "construction_speed_mwh_per_month": 28, "no_of_battery_units": 0, "notes_split": ["LFP batteries"], "links": ["https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dodge Flat", "city": "", "id": "230", "external_id": "63913", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Dodge Flat Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "230", "external_id": "63913", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dodge Flat", "external_id": "63913", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Dodge Flat Solar, LLC", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2021-08", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DODGB": {"first": {"year": "2021", "month": "12", "entity id": "63578", "entity name": "Dodge Flat Solar, LLC", "plant producer type": "IPP", "plant name": "Dodge Flat", "plant state": "NV", "plant id": "63913", "generator id": "DODGB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63913", "date": "2021-12", "mw": 50}, "first_month": "2021-06", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "63578", "entity name": "Dodge Flat Solar, LLC", "plant producer type": "IPP", "plant name": "Dodge Flat", "plant state": "NV", "plant id": "63913", "generator id": "DODGB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63913", "date": "2022-03", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2021-06", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2021-08", "start_operation": "2022-03", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "Dodge Flat", "name_short": "Dodge Flat", "owner": "Dodge Flat Solar, LLC", "state": "nevada", "country": "usa", "lat": "41.543396", "long": "-114.96600600000001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.543396+-114.96600600000001", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fish Springs", "city": "", "id": "231", "external_id": "64148", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Fish Springs Ranch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "231", "external_id": "64148", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Fish Springs", "external_id": "64148", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Fish Springs Ranch Solar, LLC", "status": "operation", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FISHB": {"first": {"year": "2021", "month": "12", "entity id": "63772", "entity name": "Fish Springs Ranch Solar, LLC", "plant producer type": "IPP", "plant name": "Fish Springs", "plant state": "NV", "plant id": "64148", "generator id": "FISHB", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64148", "date": "2021-12", "mw": 25}, "first_month": "2021-04", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "63772", "entity name": "Fish Springs Ranch Solar, LLC", "plant producer type": "IPP", "plant name": "Fish Springs", "plant state": "NV", "plant id": "64148", "generator id": "FISHB", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64148", "date": "2022-03", "mw": 25}, "current_month": "2023-02", "dates": {"first_heard": "2021-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2022-03", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "Fish Springs", "name_short": "Fish Springs", "owner": "Fish Springs Ranch Solar, LLC", "state": "nevada", "country": "usa", "lat": "41.51805660646126", "long": "-114.9839926343362", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.51805660646126+-114.9839926343362", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wheatridge Hybrid", "city": "", "id": "239", "external_id": "62745", "state": "oregon", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Wheatridge Wind Holdings, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "239", "external_id": "62745", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wheatridge Hybrid", "external_id": "62745", "state": "oregon", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Wheatridge Wind Holdings, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-12", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BTRY": {"first": {"year": "2021", "month": "12", "entity id": "62668", "entity name": "Wheatridge Wind Energy, LLC", "plant producer type": "IPP", "plant name": "Wheatridge Hybrid", "plant state": "OR", "plant id": "62745", "generator id": "BTRY", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62745", "date": "2021-12", "mw": 30}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "entity name", "from": "Wheatridge Wind Energy, LLC", "to": "Wheatridge Wind Holdings, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-12", "to": "2022-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "62668", "entity name": "Wheatridge Wind Holdings, LLC", "plant producer type": "IPP", "plant name": "Wheatridge Hybrid", "plant state": "OR", "plant id": "62745", "generator id": "BTRY", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62745", "date": "2022-03", "mw": 30}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-12"}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-12", "start_operation": "2022-03", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "Wheatridge Hybrid", "name_short": "Wheatridge", "owner": "Wheatridge Wind Holdings, LLC", "state": "oregon", "country": "usa", "lat": "45.52252661545126", "long": "-117.89061341879585", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:45.52252661545126+-117.89061341879585", "construction_time_month": 3, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Liverpool Energy Management Facility", "city": "", "id": "414", "external_id": "7772", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statkraft UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "414", "external_id": "7772", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Liverpool Energy Management Facility", "external_id": "7772", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statkraft UK", "status": "operation", "date_first_heard": "2020-06-17", "start_construction": "2021-10-01", "start_operation": "2022-03-01", "start_estimated": "", "month_disappeared": "", "lat": "53.419914", "long": "-2.927592", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7772", "Record Last Updated (dd/mm/yyyy)": "23/09/2020", "Operator (or Applicant)": "Statkraft UK", "Site Name": "Liverpool Energy Management Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To The South Of, Carnegie Road, Liverpool, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338451", "Y-coordinate": "391858", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "20F/0550", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/06/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/06/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419914", "long": "-2.927592", "status": "planning", "mw": 49, "ext_id": "7772"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Land To The South Of, Carnegie Road, Liverpool, Merseyside", "to": "Land To The South Of, Carnegie Road, Liverpool,", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/09/2020", "to": "22/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2021", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/03/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/06/2023", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7772", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Statkraft UK", "Site Name": "Liverpool Energy Management Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South Of, Carnegie Road, Liverpool,", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338451", "Y-coordinate": "391858", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "20F/0550", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/06/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/06/2023", "Under Construction": "01/10/2021", "Operational": "01/03/2022", "Heat Network Ref": "", "lat": "53.419914", "long": "-2.927592", "status": "operation", "mw": 49, "ext_id": "7772"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-23", "start_construction": "", "start_operation": "2023-06-22"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-06-17", "start_construction": "2021-10-01", "start_operation": "2022-03-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "Liverpool Energy Management Facility", "name_short": "Liverpool Energy Management Facilit...", "owner": "Statkraft UK", "state": "north west", "country": "uk", "lat": "53.419914", "long": "-2.927592", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419914+-2.927592", "construction_time_month": 5, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kearny North Energy Storage", "city": "", "id": "202", "external_id": "64612", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "202", "external_id": "64612", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kearny North Energy Storage", "external_id": "64612", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2021-07", "start_operation": "2022-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KNES": {"first": {"year": "2021", "month": "6", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Kearny North Energy Storage", "plant state": "CA", "plant id": "64612", "generator id": "KNES", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64612", "date": "2021-06", "mw": 10}, "first_month": "2021-06", "changes": [{"month": "2021-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "2", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Kearny North Energy Storage", "plant state": "CA", "plant id": "64612", "generator id": "KNES", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64612", "date": "2022-02", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2021-06", "start_construction": "2021-07"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2021-07", "start_operation": "2022-02", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2022-02", "go_live_year_int": 2022, "name": "Kearny North Energy Storage", "name_short": "Kearny North", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.148539551100875", "long": "-121.26445225224751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.148539551100875+-121.26445225224751", "construction_time_month": 7, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kearny South Energy Storage", "city": "", "id": "203", "external_id": "64614", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "203", "external_id": "64614", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kearny South Energy Storage", "external_id": "64614", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2021-07", "start_operation": "2022-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KSES": {"first": {"year": "2021", "month": "6", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Kearny South Energy Storage", "plant state": "CA", "plant id": "64614", "generator id": "KSES", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64614", "date": "2021-06", "mw": 10}, "first_month": "2021-06", "changes": [{"month": "2021-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "2", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Kearny South Energy Storage", "plant state": "CA", "plant id": "64614", "generator id": "KSES", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64614", "date": "2022-02", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2021-06", "start_construction": "2021-07"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2021-07", "start_operation": "2022-02", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2022-02", "go_live_year_int": 2022, "name": "Kearny South Energy Storage", "name_short": "Kearny South", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.17607212162875", "long": "-121.2612551733487", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17607212162875+-121.2612551733487", "construction_time_month": 7, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alaska Soldotna", "city": "Soldotna Power Plant", "id": "23", "external_id": "57206", "state": "alaska", "country": "usa", "capacity_mwh": "93", "estimate_mwh": "", "power_mw": "46", "customer": "Homer Electric Association", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "37", "status": "operation", "date_first_heard": "2019-12-03", "start_construction": "", "start_operation": "2021-07-23", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "60.500441", "long": "-150.996312", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "link2": "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/", "link3": "", "link4": ""}, "internal_id": "23", "external_id": "57206", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Soldotna", "external_id": "57206", "state": "alaska", "country": "usa", "mwh": 0, "estimate_mwh": 92, "power_mw": 46, "owner": "Homer Electric Assn Inc", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"3": {"first": {"year": "2021", "month": "9", "entity id": "19558", "entity name": "Homer Electric Assn Inc", "plant producer type": "Electric Utility", "plant name": "Soldotna", "plant state": "AK", "plant id": "57206", "generator id": "3", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57206", "date": "2021-09", "mw": 46}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "1", "entity id": "19558", "entity name": "Homer Electric Assn Inc", "plant producer type": "Electric Utility", "plant name": "Soldotna", "plant state": "AK", "plant id": "57206", "generator id": "3", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57206", "date": "2022-01", "mw": 46}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 46, "mwh_is_estimate": false, "mwh": 93, "mwh_estimate": 92, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-01", "go_live_year_int": 2022, "name": "Soldotna", "name_short": "Soldotna", "owner": "Homer Electric Assn Inc", "state": "alaska", "country": "usa", "lat": "60.500441", "long": "-150.996312", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:60.500441+-150.996312", "construction_time_month": 14, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 37, "notes_split": [""], "links": ["https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Searcy Solar Hybrid", "city": "", "id": "143", "external_id": "62617", "state": "arkansas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Searcy Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "143", "external_id": "62617", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Searcy Solar Hybrid", "external_id": "62617", "state": "arkansas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Searcy Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-02", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SEABT": {"first": {"year": "2021", "month": "12", "entity id": "62109", "entity name": "Searcy Solar, LLC", "plant producer type": "IPP", "plant name": "Searcy Solar Hybrid", "plant state": "AR", "plant id": "62617", "generator id": "SEABT", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62617", "date": "2021-12", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "1", "entity id": "62109", "entity name": "Searcy Solar, LLC", "plant producer type": "IPP", "plant name": "Searcy Solar Hybrid", "plant state": "AR", "plant id": "62617", "generator id": "SEABT", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62617", "date": "2022-01", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-02"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-02", "start_operation": "2022-01", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-01", "go_live_year_int": 2022, "name": "Searcy Solar Hybrid", "name_short": "Searcy Solar", "owner": "Searcy Solar, LLC", "state": "arkansas", "country": "usa", "lat": "36.16040548117874", "long": "-91.0622543531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.16040548117874+-91.0622543531653", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Victorian Big Battery", "city": "geelong", "id": "2", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "450", "estimate_mwh": "", "power_mw": "300", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "212", "status": "operation", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.037741", "long": "144.290949", "coords_hint": "1", "use_case": "", "notes": "incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ** 2021-09-03 moving project back to construction", "project_website": "https://victorianbigbattery.com.au/", "link1": "https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "link2": "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "link3": "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "link4": "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"}, "internal_id": "2", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 300, "mwh_is_estimate": false, "mwh": 450, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Victorian Big Battery", "name_short": "Victorian Big Battery", "owner": "", "state": "victoria", "country": "australia", "lat": "-38.037741", "long": "144.290949", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-38.037741+144.290949", "construction_time_month": 11, "construction_speed_mwh_per_month": 40, "no_of_battery_units": 212, "notes_split": ["incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ", " 2021-09-03 moving project back to construction"], "links": ["https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wallgrove Grid Battery", "city": "Wallgrove / Sydney", "id": "12", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "75", "estimate_mwh": "", "power_mw": "50", "customer": "TransGrid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "cost_million": "65", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-33.817659", "long": "150.828087", "coords_hint": "1", "use_case": "FCAS, synthetic inertia", "notes": "", "project_website": "https://www.transgrid.com.au/wallgrovebattery", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "link2": "https://arena.gov.au/projects/transgrid-wallgrove-battery/", "link3": "", "link4": ""}, "internal_id": "12", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 75, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Wallgrove Grid Battery", "name_short": "Wallgrove Grid Battery", "owner": "", "state": "new south wales", "country": "australia", "lat": "-33.817659", "long": "150.828087", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.817659+150.828087", "construction_time_month": 10, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "https://arena.gov.au/projects/transgrid-wallgrove-battery/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Garland Storage Retrofit", "city": "Kern County", "id": "70", "external_id": "60233", "state": "california", "country": "usa", "capacity_mwh": "352", "estimate_mwh": "", "power_mw": "88", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Powin", "type": "", "cells": "Mitsubishi", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-05-01", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.829699", "long": "-118.510184", "coords_hint": "1", "use_case": "200 MW solar farm support", "notes": "LFP batteries", "project_website": "https://www.southernpowercompany.com/content/dam/southernpower/pdfs/fact-sheets/Garland_Energy_Storage_factsheet.pdf", "link1": "https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "link2": "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref", "link3": "", "link4": ""}, "internal_id": "70", "external_id": "60233", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "RE Garland", "external_id": "60233", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 176, "power_mw": 88, "owner": "Southern Power Co", "status": "operation", "date_first_heard": "2021-03", "start_construction": "2021-05", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2021", "month": "8", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Garland", "plant state": "CA", "plant id": "60233", "generator id": "BESS1", "net summer capacity (mw)": "88", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "60233", "date": "2021-08", "mw": 88}, "first_month": "2021-03", "changes": [{"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 88, "to": 45, "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "8", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Garland", "plant state": "CA", "plant id": "60233", "generator id": "BESS1", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60233", "date": "2021-08", "mw": 45}, "current_month": "2022-02", "dates": {"first_heard": "2021-03", "start_construction": "2021-05"}, "month_disappeared": ""}, "BESS2": {"first": {"year": "2021", "month": "12", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Garland", "plant state": "CA", "plant id": "60233", "generator id": "BESS2", "net summer capacity (mw)": "43", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60233", "date": "2021-12", "mw": 43}, "first_month": "2022-02", "changes": [], "current": {"year": "2021", "month": "12", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Garland", "plant state": "CA", "plant id": "60233", "generator id": "BESS2", "net summer capacity (mw)": "43", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60233", "date": "2021-12", "mw": 43}, "current_month": "2022-02", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 88, "mwh_is_estimate": false, "mwh": 352, "mwh_estimate": 176, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-03", "start_construction": "2021-05", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "RE Garland", "name_short": "RE Garland", "owner": "Southern Power Co", "state": "california", "country": "usa", "lat": "34.829699", "long": "-118.510184", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.829699+-118.510184", "construction_time_month": 7, "construction_speed_mwh_per_month": 50, "no_of_battery_units": 0, "notes_split": ["LFP batteries"], "links": ["https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hudson - High Desert Hybrid", "city": "", "id": "180", "external_id": "64624", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Goldman Sachs Renewable Power Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "180", "external_id": "64624", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hudson - High Desert Hybrid", "external_id": "64624", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Goldman Sachs Renewable Power Group", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2021", "month": "9", "entity id": "61944", "entity name": "Goldman Sachs Renewable Power Group", "plant producer type": "IPP", "plant name": "Hudson - High Desert Hybrid", "plant state": "CA", "plant id": "64624", "generator id": "BESS1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64624", "date": "2021-09", "mw": 50}, "first_month": "2021-06", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "61944", "entity name": "Goldman Sachs Renewable Power Group", "plant producer type": "IPP", "plant name": "Hudson - High Desert Hybrid", "plant state": "CA", "plant id": "64624", "generator id": "BESS1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64624", "date": "2021-12", "mw": 50}, "current_month": "2022-02", "dates": {"first_heard": "2021-06", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Hudson - High Desert Hybrid", "name_short": "Hudson - High Desert", "owner": "Goldman Sachs Renewable Power Group", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.140049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.140049", "construction_time_month": 4, "construction_speed_mwh_per_month": 25, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E3 ", "city": "", "id": "192", "external_id": "64877", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "192", "external_id": "64877", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E3", "external_id": "64877", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 26, "power_mw": 13, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2021", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E3 ", "plant state": "CA", "plant id": "64877", "generator id": "BESS", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64877", "date": "2021-12", "mw": 12}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "plant name", "from": "Edwards Sanborn E3 ", "to": "Edwards Sanborn E3", "extra": "", "change_type": "misc"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 12, "to": 14, "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 14, "to": 13, "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E3", "plant state": "CA", "plant id": "64877", "generator id": "BESS", "net summer capacity (mw)": "13.7", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64877", "date": "2021-12", "mw": 13}, "current_month": "2022-02", "dates": {"first_heard": "2021-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 13, "mwh_is_estimate": true, "mwh": 26, "mwh_estimate": 26, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2021-12", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Edwards Sanborn E3", "name_short": "Edwards Sanborn E3", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "40.99101310348649", "long": "-121.48126880673999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.99101310348649+-121.48126880673999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trenton", "city": "", "id": "208", "external_id": "63995", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Duke Energy Florida, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "208", "external_id": "63995", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Trenton", "external_id": "63995", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "Duke Energy Florida, LLC", "status": "operation", "date_first_heard": "2020-10", "start_construction": "", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ES1": {"first": {"year": "2021", "month": "6", "entity id": "6455", "entity name": "Duke Energy Florida, LLC", "plant producer type": "Electric Utility", "plant name": "Trenton", "plant state": "FL", "plant id": "63995", "generator id": "ES1", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63995", "date": "2021-06", "mw": 11}, "first_month": "2020-10", "changes": [{"month": "2021-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2022-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-01", "to": "2021-12", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "12", "entity id": "6455", "entity name": "Duke Energy Florida, LLC", "plant producer type": "Electric Utility", "plant name": "Trenton", "plant state": "FL", "plant id": "63995", "generator id": "ES1", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63995", "date": "2021-12", "mw": 11}, "current_month": "2022-02", "dates": {"first_heard": "2020-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10", "start_construction": "", "start_operation": "2021-12", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Trenton", "name_short": "Trenton", "owner": "Duke Energy Florida, LLC", "state": "florida", "country": "usa", "lat": "30.235434204403475", "long": "-82.28990899100998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.235434204403475+-82.28990899100998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cool Springs Solar (Hybrid)", "city": "", "id": "209", "external_id": "63721", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Cool Springs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "209", "external_id": "63721", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cool Springs Solar (Hybrid)", "external_id": "63721", "state": "georgia", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Cool Springs Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CSBAT": {"first": {"year": "2021", "month": "11", "entity id": "63414", "entity name": "Cool Springs Solar, LLC", "plant producer type": "IPP", "plant name": "Cool Springs Solar (Hybrid)", "plant state": "GA", "plant id": "63721", "generator id": "CSBAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63721", "date": "2021-11", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "63414", "entity name": "Cool Springs Solar, LLC", "plant producer type": "IPP", "plant name": "Cool Springs Solar (Hybrid)", "plant state": "GA", "plant id": "63721", "generator id": "CSBAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63721", "date": "2021-12", "mw": 40}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-12", "start_estimated": "2021-11", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Cool Springs Solar (Hybrid)", "name_short": "Cool Springs Solar (Hybrid)", "owner": "Cool Springs Solar, LLC", "state": "georgia", "country": "usa", "lat": "32.265775364886245", "long": "-82.18751619022643", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.265775364886245+-82.18751619022643", "construction_time_month": 11, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Townsite Solar Project Hybrid", "city": "", "id": "228", "external_id": "60654", "state": "nevada", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "180", "power_mw": "90", "customer": "Arevon", "owner": "Townsite Solar, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.935805", "long": "-114.869386", "coords_hint": "1", "use_case": "190MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesla.com/videos/townsite-solar-storage", "link2": "https://arevonenergy.com/location/townsite/", "link3": "", "link4": ""}, "internal_id": "228", "external_id": "60654", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Townsite Solar Project Hybrid", "external_id": "60654", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 180, "power_mw": 90, "owner": "Townsite Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2021", "month": "11", "entity id": "60387", "entity name": "Townsite Solar, LLC", "plant producer type": "IPP", "plant name": "Townsite Solar Project Hybrid", "plant state": "NV", "plant id": "60654", "generator id": "GEN02", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "60654", "date": "2021-11", "mw": 90}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "60387", "entity name": "Townsite Solar, LLC", "plant producer type": "IPP", "plant name": "Townsite Solar Project Hybrid", "plant state": "NV", "plant id": "60654", "generator id": "GEN02", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60654", "date": "2021-12", "mw": 90}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 90, "mwh_is_estimate": false, "mwh": 360, "mwh_estimate": 180, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "2021-11", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Townsite Solar Project Hybrid", "name_short": "Townsite Solar", "owner": "Townsite Solar, LLC", "state": "nevada", "country": "usa", "lat": "35.935805", "long": "-114.869386", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.935805+-114.869386", "construction_time_month": 4, "construction_speed_mwh_per_month": 90, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesla.com/videos/townsite-solar-storage", "https://arevonenergy.com/location/townsite/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Dunkirk 2", "city": "Dunkirk", "id": "258", "external_id": "", "state": "", "country": "france", "capacity_mwh": "31", "estimate_mwh": "", "power_mw": "31", "customer": "", "owner": "Total", "developer": "", "manufacturer": "Saft", "type": "Intensium Max 20 High Energy (20ft container)", "cells": "NMC", "no_of_battery_units": "16", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.030471", "long": "2.255373", "coords_hint": "2", "use_case": "", "notes": "saft is owned by total", "project_website": "", "link1": "https://www.energy-storage.news/frances-largest-battery-storage-facility-expanded-to-61mw-61mwh-as-second-phase-completed/", "link2": "", "link3": "", "link4": ""}, "internal_id": "258", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 31, "mwh_is_estimate": false, "mwh": 31, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-22", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Dunkirk 2", "name_short": "Dunkirk 2", "owner": "Total", "state": "", "country": "france", "lat": "51.030471", "long": "2.255373", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.030471+2.255373", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 16, "notes_split": ["saft is owned by total"], "links": ["https://www.energy-storage.news/frances-largest-battery-storage-facility-expanded-to-61mw-61mwh-as-second-phase-completed/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Severn Road", "city": "", "id": "332", "external_id": "7085", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "FPC Industry & Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "332", "external_id": "7085", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Severn Road", "external_id": "7085", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "FPC Industry & Enterprise", "status": "operation", "date_first_heard": "2017-12-22", "start_construction": "2021-08-01", "start_operation": "2021-12-23", "start_estimated": "", "month_disappeared": "", "lat": "51.518327", "long": "-2.660396", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7085", "Record Last Updated (dd/mm/yyyy)": "30/07/2020", "Operator (or Applicant)": "FPC Industry & Enterprise", "Site Name": "Severn Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "18.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At, Severn Road, Hallen, Bristol, Avon", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS10 7RZ", "X-coordinate": "354274", "Y-coordinate": "180141", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "PT17/4664/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.518327", "long": "-2.660396", "status": "planning", "mw": 18, "ext_id": "7085"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/07/2020", "to": "10/01/2022", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "18.00", "to": "32.00", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land At, Severn Road, Hallen, Bristol, Avon", "to": "Land At, Severn Road, Hallen, Bristol", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/08/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 18, "to": 32, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2022", "to": "13/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "23/12/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/10/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "13/10/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7085", "Record Last Updated (dd/mm/yyyy)": "13/10/2022", "Operator (or Applicant)": "FPC Industry & Enterprise", "Site Name": "Severn Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At, Severn Road, Hallen, Bristol", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS10 7RZ", "X-coordinate": "354274", "Y-coordinate": "180141", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "PT17/4664/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/08/2021", "Operational": "23/12/2021", "Heat Network Ref": "", "lat": "51.518327", "long": "-2.660396", "status": "operation", "mw": 32, "ext_id": "7085"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-30", "start_construction": "2022-01-10", "start_operation": "2022-10-13"}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-12-22", "start_construction": "2021-08-01", "start_operation": "2021-12-23", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Severn Road", "name_short": "Severn Road", "owner": "FPC Industry & Enterprise", "state": "south west", "country": "uk", "lat": "51.518327", "long": "-2.660396", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.518327+-2.660396", "construction_time_month": 4, "construction_speed_mwh_per_month": 8, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batterie Breitenworbis", "city": "", "id": "566", "external_id": "SEE977720016904", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "566", "external_id": "SEE977720016904", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batterie Breitenworbis", "external_id": "SEE977720016904", "state": "thuringia", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "VERBUND Energy4Business Germany GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": "", "month_disappeared": "", "lat": "51.416043", "long": "10.460464", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4750172"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE977720016904", "DatumLetzteAktualisierung": "2022-01-13T15:42:14.5435034", "LokationMaStRNummer": "SEL901333602698", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-01-13", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1415", "Landkreis": "Eichsfeld", "Gemeinde": "Breitenworbis", "Gemeindeschluessel": "16061017", "Postleitzahl": "37339", "Gemarkung": "37339 Breitenworbis", "FlurFlurstuecknummern": "Flur: 1; Flurst\u00fcck: 32/5", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Breitenworbis", "Laengengrad": "10.460464", "Breitengrad": "51.416043", "Registrierungsdatum": "2022-01-13", "Inbetriebnahmedatum": "2021-12-16", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Breitenworbis", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE937542481601", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4750172", "mwh": 10, "owner": "VERBUND Energy4Business Germany GmbH", "ext_id": "SEE977720016904", "mw": 10, "status": "operation"}, "first_month": "2022-01", "changes": [{"month": "2022-12", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2022-01-13", "to": "2022-11-09", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE977720016904", "DatumLetzteAktualisierung": "2022-01-13T15:42:14.5435034", "LokationMaStRNummer": "SEL901333602698", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-09", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1415", "Landkreis": "Eichsfeld", "Gemeinde": "Breitenworbis", "Gemeindeschluessel": "16061017", "Postleitzahl": "37339", "Gemarkung": "37339 Breitenworbis", "FlurFlurstuecknummern": "Flur: 1; Flurst\u00fcck: 32/5", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Breitenworbis", "Laengengrad": "10.460464", "Breitengrad": "51.416043", "Registrierungsdatum": "2022-01-13", "Inbetriebnahmedatum": "2021-12-16", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Breitenworbis", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE937542481601", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4750172", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 10, "ext_id": "SEE977720016904", "mw": 10, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Batterie Breitenworbis", "name_short": "Batterie Breitenworbis", "owner": "VERBUND Energy4Business Germany GmbH", "state": "thuringia", "country": "germany", "lat": "51.416043", "long": "10.460464", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.416043+10.460464", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4750172"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Manatee", "city": "Parrish / Manatee County", "id": "71", "external_id": "60014", "state": "florida", "country": "usa", "capacity_mwh": "900", "estimate_mwh": "", "power_mw": "409", "customer": "Florida Power and Light (FPL)", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-03-01", "start_construction": "2021-02-02", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "27.598383", "long": "-82.349213", "coords_hint": "1", "use_case": "solar farm support", "notes": "Already 75% complete in August 2021, 132 shipping containers", "project_website": "", "link1": "https://www.world-energy.org/article/19846.html", "link2": "https://www.youtube.com/watch?v=ZYbvXAS9buQ", "link3": "https://www.energy-storage.news/work-begins-on-409mw-900mwh-florida-battery-project-to-ease-natural-gas-plants-into-retirement/", "link4": ""}, "internal_id": "71", "external_id": "60014", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Manatee Solar Energy Center", "external_id": "60014", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 818, "power_mw": 409, "owner": "Florida Power & Light Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BMS": {"first": {"year": "2021", "month": "11", "entity id": "6452", "entity name": "Florida Power & Light Co", "plant producer type": "Electric Utility", "plant name": "Manatee Solar Energy Center", "plant state": "FL", "plant id": "60014", "generator id": "BMS", "net summer capacity (mw)": "409", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "60014", "date": "2021-11", "mw": 409}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "6452", "entity name": "Florida Power & Light Co", "plant producer type": "Electric Utility", "plant name": "Manatee Solar Energy Center", "plant state": "FL", "plant id": "60014", "generator id": "BMS", "net summer capacity (mw)": "409", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60014", "date": "2021-11", "mw": 409}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 409, "mwh_is_estimate": false, "mwh": 900, "mwh_estimate": 818, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "go_live": "2021-11", "go_live_year_int": 2021, "name": "Manatee Solar Energy Center", "name_short": "Manatee Solar", "owner": "Florida Power & Light Co", "state": "florida", "country": "usa", "lat": "27.598383", "long": "-82.349213", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:27.598383+-82.349213", "construction_time_month": 10, "construction_speed_mwh_per_month": 90, "no_of_battery_units": 0, "notes_split": ["Already 75% complete in August 2021, 132 shipping containers"], "links": ["https://www.world-energy.org/article/19846.html", "https://www.youtube.com/watch?v=ZYbvXAS9buQ", "https://www.energy-storage.news/work-begins-on-409mw-900mwh-florida-battery-project-to-ease-natural-gas-plants-into-retirement/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sanborn BESS 2", "city": "", "id": "172", "external_id": "64713", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "172", "external_id": "64713", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sanborn BESS 2", "external_id": "64713", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Terra-Gen Operating Co-BESS", "status": "operation", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ESSB2": {"first": {"year": "2021", "month": "8", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 2", "plant state": "CA", "plant id": "64713", "generator id": "ESSB2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64713", "date": "2021-08", "mw": 100}, "first_month": "2021-07", "changes": [{"month": "2021-09", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 2", "plant state": "CA", "plant id": "64713", "generator id": "ESSB2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64713", "date": "2021-11", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2021-11", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2021-11", "go_live_year_int": 2021, "name": "Sanborn BESS 2", "name_short": "Sanborn BESS 2", "owner": "Terra-Gen Operating Co-BESS", "state": "california", "country": "usa", "lat": "41.01452451357819", "long": "-121.448908126965", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01452451357819+-121.448908126965", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cal Flats BESS", "city": "", "id": "176", "external_id": "63930", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "CD Arevon USA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "176", "external_id": "63930", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cal Flats BESS", "external_id": "63930", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "CD Arevon USA, Inc.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CF60": {"first": {"year": "2021", "month": "6", "entity id": "63600", "entity name": "Cal Flats BESS, LLC", "plant producer type": "IPP", "plant name": "Cal Flats BESS", "plant state": "CA", "plant id": "63930", "generator id": "CF60", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63930", "date": "2021-06", "mw": 60}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "entity id", "from": "63600", "to": "61230", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Cal Flats BESS, LLC", "to": "CD Arevon USA, Inc.", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-06", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "61230", "entity name": "CD Arevon USA, Inc.", "plant producer type": "IPP", "plant name": "Cal Flats BESS", "plant state": "CA", "plant id": "63930", "generator id": "CF60", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63930", "date": "2021-11", "mw": 60}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-04"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2021-11", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2021-11", "go_live_year_int": 2021, "name": "Cal Flats BESS", "name_short": "Cal Flats", "owner": "CD Arevon USA, Inc.", "state": "california", "country": "usa", "lat": "40.86398962756772", "long": "-121.21599637753002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.86398962756772+-121.21599637753002", "construction_time_month": 7, "construction_speed_mwh_per_month": 17, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Henrietta D Energy Storage LLC", "city": "", "id": "196", "external_id": "60641", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Convergent Energy and Power LP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "196", "external_id": "60641", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Henrietta D Energy Storage LLC", "external_id": "60641", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Convergent Energy and Power LP", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HDES1": {"first": {"year": "2021", "month": "1", "entity id": "61978", "entity name": "Convergent Energy and Power LP", "plant producer type": "IPP", "plant name": "Henrietta D Energy Storage LLC", "plant state": "CA", "plant id": "60641", "generator id": "HDES1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "60641", "date": "2021-01", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "date", "from": "2021-01", "to": "2021-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2020-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-01", "li": [{"name": "date", "from": "2021-03", "to": "2021-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-04", "to": "2021-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "61978", "entity name": "Convergent Energy and Power LP", "plant producer type": "IPP", "plant name": "Henrietta D Energy Storage LLC", "plant state": "CA", "plant id": "60641", "generator id": "HDES1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60641", "date": "2021-11", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-12"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2021-11", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-11", "go_live_year_int": 2021, "name": "Henrietta D Energy Storage LLC", "name_short": "Henrietta D Energy Storage", "owner": "Convergent Energy and Power LP", "state": "california", "country": "usa", "lat": "40.82594736691591", "long": "-121.20363569775502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.82594736691591+-121.20363569775502", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mustang", "city": "Kings County", "id": "74", "external_id": "59150", "state": "california", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "75", "customer": "Recurrent Energy / Goldman Sachs Renewables Power (GSRP)", "owner": "", "developer": "", "manufacturer": "byd", "type": "", "cells": "LFP", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.245785", "long": "-119.904115", "coords_hint": "0", "use_case": "100MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/mustang-solar-storage/", "link1": "https://www.energy-storage.news/canadian-solar-will-retrofit-300mwh-of-batteries-at-goldman-sachss-mustang-solar-plant-california/", "link2": "", "link3": "", "link4": ""}, "internal_id": "74", "external_id": "59150", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "RE Mustang LLC", "external_id": "59150", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Goldman Sachs Renewable Power Group", "status": "operation", "date_first_heard": "2021-07", "start_construction": "2021-09", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2021", "month": "10", "entity id": "61944", "entity name": "Goldman Sachs Renewable Power Group", "plant producer type": "IPP", "plant name": "RE Mustang LLC", "plant state": "CA", "plant id": "59150", "generator id": "BESS1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "59150", "date": "2021-10", "mw": 75}, "first_month": "2021-07", "changes": [{"month": "2021-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "61944", "entity name": "Goldman Sachs Renewable Power Group", "plant producer type": "IPP", "plant name": "RE Mustang LLC", "plant state": "CA", "plant id": "59150", "generator id": "BESS1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59150", "date": "2021-10", "mw": 75}, "current_month": "2022-02", "dates": {"first_heard": "2021-07", "start_construction": "2021-09"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 150, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "2021-09", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "RE Mustang LLC", "name_short": "RE Mustang", "owner": "Goldman Sachs Renewable Power Group", "state": "california", "country": "usa", "lat": "36.245785", "long": "-119.904115", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.245785+-119.904115", "construction_time_month": 1, "construction_speed_mwh_per_month": 300, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/canadian-solar-will-retrofit-300mwh-of-batteries-at-goldman-sachss-mustang-solar-plant-california/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Permian Energy Center", "city": "Andrews Country", "id": "88", "external_id": "63255", "state": "texas", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "40", "customer": "ExxonMobil", "owner": "Orsted", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-11-01", "start_operation": "2021-05-04", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.121853", "long": "-102.529659", "coords_hint": "1", "use_case": "420MW solar farm support", "notes": "built on a depleted oil field in the Permian Basin ** 2018: 12 year PPA with Exxon Mobil ** got exact location from the 2020 amended agreement doc on texas.gov site", "project_website": "https://orsted.com/en/our-business/solar-and-battery-storage/our-solar-and-storage-centers", "link1": "https://orsted.com/en/media/newsroom/news/2021/05/885212783010106", "link2": "https://www.nsenergybusiness.com/projects/permian-energy-centre/#", "link3": "https://comptroller.texas.gov/economy/local/ch313/agreement-docs-details.php?id=1411", "link4": ""}, "internal_id": "88", "external_id": "63255", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "2W Permian Solar Project Hybrid", "external_id": "63255", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "2W Permian Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"2WPBA": {"first": {"year": "2021", "month": "5", "entity id": "63012", "entity name": "2W Permian Solar, LLC", "plant producer type": "IPP", "plant name": "2W Permian Solar Project Hybrid", "plant state": "TX", "plant id": "63255", "generator id": "2WPBA", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63255", "date": "2021-05", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-05", "to": "2021-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "63012", "entity name": "2W Permian Solar, LLC", "plant producer type": "IPP", "plant name": "2W Permian Solar Project Hybrid", "plant state": "TX", "plant id": "63255", "generator id": "2WPBA", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63255", "date": "2021-10", "mw": 40}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2019-11-01", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "2W Permian Solar Project Hybrid", "name_short": "2W Permian Solar", "owner": "2W Permian Solar, LLC", "state": "texas", "country": "usa", "lat": "32.121853", "long": "-102.529659", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.121853+-102.529659", "construction_time_month": 23, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": ["built on a depleted oil field in the Permian Basin ", " 2018: 12 year PPA with Exxon Mobil ", " got exact location from the 2020 amended agreement doc on texas.gov site"], "links": ["https://orsted.com/en/media/newsroom/news/2021/05/885212783010106", "https://www.nsenergybusiness.com/projects/permian-energy-centre/#", "https://comptroller.texas.gov/economy/local/ch313/agreement-docs-details.php?id=1411"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bat Cave", "city": "Mason County", "id": "115", "external_id": "64312", "state": "texas", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-09-15", "start_operation": "", "start_estimated": "2021", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.7345278", "long": "-99.2311111", "coords_hint": "1", "use_case": "", "notes": "location verified from photo on broad reach power website", "project_website": "https://broadreachpower.com/projects/", "link1": "https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/", "link2": "", "link3": "", "link4": ""}, "internal_id": "115", "external_id": "64312", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bat Cave", "external_id": "64312", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Broad Reach Power", "status": "operation", "date_first_heard": "2021-02", "start_construction": "", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BC": {"first": {"year": "2021", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Bat Cave", "plant state": "TX", "plant id": "64312", "generator id": "BC", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64312", "date": "2021-06", "mw": 100}, "first_month": "2021-02", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Bat Cave", "plant state": "TX", "plant id": "64312", "generator id": "BC", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64312", "date": "2021-10", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02", "start_construction": "2020-09-15", "start_operation": "2021-10", "start_estimated": "2021", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Bat Cave", "name_short": "Bat Cave", "owner": "Broad Reach Power", "state": "texas", "country": "usa", "lat": "30.7345278", "long": "-99.2311111", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.7345278+-99.2311111", "construction_time_month": 13, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": ["location verified from photo on broad reach power website"], "links": ["https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Fork", "city": "Williamson County", "id": "116", "external_id": "64317", "state": "texas", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-09-15", "start_operation": "", "start_estimated": "2021", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.655335", "long": "-97.883739", "coords_hint": "0", "use_case": "", "notes": "location from the broad reach power website, but do not think it is correct", "project_website": "https://broadreachpower.com/projects/", "link1": "https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/", "link2": "", "link3": "", "link4": ""}, "internal_id": "116", "external_id": "64317", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "North Fork TX", "external_id": "64317", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Broad Reach Power", "status": "operation", "date_first_heard": "2021-02", "start_construction": "", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NF": {"first": {"year": "2021", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "North Fork TX", "plant state": "TX", "plant id": "64317", "generator id": "NF", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64317", "date": "2021-06", "mw": 100}, "first_month": "2021-02", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "North Fork TX", "plant state": "TX", "plant id": "64317", "generator id": "NF", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64317", "date": "2021-10", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02", "start_construction": "2020-09-15", "start_operation": "2021-10", "start_estimated": "2021", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "North Fork TX", "name_short": "North Fork TX", "owner": "Broad Reach Power", "state": "texas", "country": "usa", "lat": "30.655335", "long": "-97.883739", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.655335+-97.883739", "construction_time_month": 13, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": ["location from the broad reach power website, but do not think it is correct"], "links": ["https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Energy Johanna Facility", "city": "", "id": "197", "external_id": "62889", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "197", "external_id": "62889", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Energy Johanna Facility", "external_id": "62889", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Hecate Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-10", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"HEGJF": {"first": {"year": "2021", "month": "1", "entity id": "62763", "entity name": "Hecate Grid, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Johanna Facility", "plant state": "CA", "plant id": "62889", "generator id": "HEGJF", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62889", "date": "2021-01", "mw": 20}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "date", "from": "2021-01", "to": "2021-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-04", "to": "2021-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "mw", "from": 20, "to": 10, "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "62763", "entity name": "Hecate Grid, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Johanna Facility", "plant state": "CA", "plant id": "62889", "generator id": "HEGJF", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62889", "date": "2021-10", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-10"}, "month_disappeared": ""}, "HJFII": {"first": {"year": "2021", "month": "1", "entity id": "62763", "entity name": "Hecate Grid, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Johanna Facility", "plant state": "CA", "plant id": "62889", "generator id": "HJFII", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62889", "date": "2021-01", "mw": 10}, "first_month": "2021-01", "changes": [{"month": "2021-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-01", "to": "2021-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-04", "to": "2021-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "62763", "entity name": "Hecate Grid, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Johanna Facility", "plant state": "CA", "plant id": "62889", "generator id": "HJFII", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62889", "date": "2021-10", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2021-01", "start_construction": "2021-02"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-10", "start_operation": "2021-10", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Hecate Energy Johanna Facility", "name_short": "Hecate Energy Johanna Facility", "owner": "Hecate Grid, LLC", "state": "california", "country": "usa", "lat": "40.85246532387877", "long": "-121.10372872573431", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.85246532387877+-121.10372872573431", "construction_time_month": 12, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chisholm Grid Energy Storage System", "city": "", "id": "243", "external_id": "63737", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Chisholm Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "243", "external_id": "63737", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Chisholm Grid Energy Storage System", "external_id": "63737", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Chisholm Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-10", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CHS01": {"first": {"year": "2021", "month": "7", "entity id": "63430", "entity name": "Astral Electricity, LLC", "plant producer type": "IPP", "plant name": "Chisholm Grid Energy Storage System", "plant state": "TX", "plant id": "63737", "generator id": "CHS01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63737", "date": "2021-07", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "entity name", "from": "Astral Electricity, LLC", "to": "Chisholm Grid, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2021-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "63430", "entity name": "Chisholm Grid, LLC", "plant producer type": "IPP", "plant name": "Chisholm Grid Energy Storage System", "plant state": "TX", "plant id": "63737", "generator id": "CHS01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63737", "date": "2021-10", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-10"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-10", "start_operation": "2021-10", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Chisholm Grid Energy Storage System", "name_short": "Chisholm Grid", "owner": "Chisholm Grid, LLC", "state": "texas", "country": "usa", "lat": "33.572170481178745", "long": "-95.1876213531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.572170481178745+-95.1876213531653", "construction_time_month": 12, "construction_speed_mwh_per_month": 16, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mannington Battery Storage Plant", "city": "", "id": "307", "external_id": "7024", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Public Power Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "307", "external_id": "7024", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mannington Battery Storage Plant", "external_id": "7024", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Still Waters Green Technology", "status": "operation", "date_first_heard": "2018-02-28", "start_construction": "2020-11-01", "start_operation": "2021-10-01", "start_estimated": "", "month_disappeared": "", "lat": "51.553544", "long": "-1.814961", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7024", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Public Power Solutions", "Site Name": "Mannington Battery Storage Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Mannington Depot Telford Way, Service Road, Mannington, Swindon, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN5 8WA", "X-coordinate": "412926", "Y-coordinate": "183867", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/17/1879", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.553544", "long": "-1.814961", "status": "planning", "mw": 49, "ext_id": "7024"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2020", "to": "14/09/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Public Power Solutions", "to": "Still Waters Green Technology", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/02/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/11/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/09/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7024", "Record Last Updated (dd/mm/yyyy)": "14/09/2022", "Operator (or Applicant)": "Still Waters Green Technology", "Site Name": "Mannington Battery Storage Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Mannington Depot Telford Way, Service Road, Mannington, Swindon, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN5 8WA", "X-coordinate": "412926", "Y-coordinate": "183867", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/17/1879", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2021", "Under Construction": "01/11/2020", "Operational": "01/10/2021", "Heat Network Ref": "", "lat": "51.553544", "long": "-1.814961", "status": "operation", "mw": 49, "ext_id": "7024"}, "current_month": "2024-01", "dates": {"first_heard": "2020-05-27", "start_construction": "", "start_operation": "2022-09-14"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-02-28", "start_construction": "2020-11-01", "start_operation": "2021-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Mannington Battery Storage Plant", "name_short": "Mannington Battery Storage Plant", "owner": "Still Waters Green Technology", "state": "south west", "country": "uk", "lat": "51.553544", "long": "-1.814961", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.553544+-1.814961", "construction_time_month": 11, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitelee Wind Farm Battery Storage Extension", "city": "", "id": "359", "external_id": "7174", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "359", "external_id": "7174", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitelee Wind Farm Battery Storage Extension", "external_id": "7174", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "status": "operation", "date_first_heard": "2019-06-10", "start_construction": "2020-10-01", "start_operation": "2021-10-01", "start_estimated": "", "month_disappeared": "", "lat": "55.695517", "long": "-4.171399", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7174", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "Site Name": "Whitelee Wind Farm Battery Storage Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "3489", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Eaglesham Moor, Whitelee Forest, Fenwick Moor, East Kilbride, South of Glasgow", "County": "Renfrewshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "G76 0PW", "X-coordinate": "263618", "Y-coordinate": "646810", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000729", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/06/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.695517", "long": "-4.171399", "status": "planning", "mw": 50, "ext_id": "7174"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "21/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/02/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "21/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7174", "Record Last Updated (dd/mm/yyyy)": "21/02/2022", "Operator (or Applicant)": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "Site Name": "Whitelee Wind Farm Battery Storage Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "3489", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Eaglesham Moor, Whitelee Forest, Fenwick Moor, East Kilbride, South of Glasgow", "County": "Renfrewshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "G76 0PW", "X-coordinate": "263618", "Y-coordinate": "646810", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000729", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/06/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/10/2020", "Operational": "01/10/2021", "Heat Network Ref": "", "lat": "55.695517", "long": "-4.171399", "status": "operation", "mw": 50, "ext_id": "7174"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": "2022-02-21"}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-06-10", "start_construction": "2020-10-01", "start_operation": "2021-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Whitelee Wind Farm Battery Storage Extension", "name_short": "Whitelee Wind Farm Battery Storage ...", "owner": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "state": "scotland", "country": "uk", "lat": "55.695517", "long": "-4.171399", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.695517+-4.171399", "construction_time_month": 12, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stonehill Energy Storage", "city": "", "id": "412", "external_id": "7773", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-02-24", "start_construction": "2021-06-09", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "412", "external_id": "7773", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stonehill Energy Storage", "external_id": "7773", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Penso Power", "status": "operation", "date_first_heard": "2020-02-24", "start_construction": "2021-06-09", "start_operation": "2021-10-09", "start_estimated": "", "month_disappeared": "", "lat": "51.605336", "long": "-2.004009", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7773", "Record Last Updated (dd/mm/yyyy)": "29/06/2020", "Operator (or Applicant)": "Penso Power", "Site Name": "Stonehill Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP", "X-coordinate": "399819", "Y-coordinate": "189611", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/11460/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/02/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "09/06/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.605336", "long": "-2.004009", "status": "construction", "mw": 50, "ext_id": "7773"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/06/2020", "to": "01/11/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "09/10/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2022-04", "li": [{"name": "Address", "from": "Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury, Wiltshire", "to": "Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury,", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2021", "to": "09/10/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7773", "Record Last Updated (dd/mm/yyyy)": "09/10/2021", "Operator (or Applicant)": "Penso Power", "Site Name": "Stonehill Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury,", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP", "X-coordinate": "399819", "Y-coordinate": "189611", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/11460/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/02/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "09/06/2021", "Operational": "09/10/2021", "Heat Network Ref": "", "lat": "51.605336", "long": "-2.004009", "status": "operation", "mw": 50, "ext_id": "7773"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-29", "start_construction": "", "start_operation": "2021-11-01"}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-02-24", "start_construction": "2021-06-09", "start_operation": "2021-10-09", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Stonehill Energy Storage", "name_short": "Stonehill", "owner": "Penso Power", "state": "south west", "country": "uk", "lat": "51.605336", "long": "-2.004009", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.605336+-2.004009", "construction_time_month": 4, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Contego", "city": "Hurstpierpoint", "id": "35", "external_id": "", "state": "west sussex", "country": "uk", "capacity_mwh": "68", "estimate_mwh": "", "power_mw": "34", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "28", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.955104", "long": "-0.163008", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.harmonyenergy.co.uk/projects/", "link1": "https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "link2": "https://www.youtube.com/watch?v=zh6PFeObrHs", "link3": "", "link4": ""}, "internal_id": "35", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 34, "mwh_is_estimate": false, "mwh": 68, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Contego", "name_short": "Contego", "owner": "", "state": "west sussex", "country": "uk", "lat": "50.955104", "long": "-0.163008", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.955104+-0.163008", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 28, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "https://www.youtube.com/watch?v=zh6PFeObrHs"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Agua Fria / Bolster Substation", "city": "Glendale / Phoenix", "id": "111", "external_id": "141", "state": "arizona", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "Salt River Project (SRP)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "32", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.553691", "long": "-112.212654", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "link2": "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/", "link3": "", "link4": ""}, "internal_id": "111", "external_id": "141", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Agua Fria", "external_id": "141", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Salt River Project", "status": "operation", "date_first_heard": "2021-10", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AFSB1": {"first": {"year": "2021", "month": "9", "entity id": "16572", "entity name": "Salt River Project", "plant producer type": "Electric Utility", "plant name": "Agua Fria", "plant state": "AZ", "plant id": "141", "generator id": "AFSB1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "141", "date": "2021-09", "mw": 25}, "first_month": "2021-10", "changes": [{"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-10", "to": "2021-09", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "9", "entity id": "16572", "entity name": "Salt River Project", "plant producer type": "Electric Utility", "plant name": "Agua Fria", "plant state": "AZ", "plant id": "141", "generator id": "AFSB1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "141", "date": "2021-09", "mw": 25}, "current_month": "2022-02", "dates": {"first_heard": "2021-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-10", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Agua Fria", "name_short": "Agua Fria", "owner": "Salt River Project", "state": "arizona", "country": "usa", "lat": "33.553691", "long": "-112.212654", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.553691+-112.212654", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 32, "notes_split": [""], "links": ["https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Mohammed bin Rashid Al Maktoum Solar Park", "city": "Dubai", "id": "118", "external_id": "", "state": "", "country": "uae", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "1", "customer": "", "owner": "Dubai Electricity and Water Authority (DEWA)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.765375", "long": "55.367443", "coords_hint": "0", "use_case": "1000MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "link2": "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/", "link3": "", "link4": ""}, "internal_id": "118", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 1, "mwh_is_estimate": false, "mwh": 8, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Mohammed bin Rashid Al Maktoum Solar Park", "name_short": "Mohammed bin Rashid Al Maktoum Sola...", "owner": "Dubai Electricity and Water Authority (DEWA)", "state": "", "country": "uae", "lat": "24.765375", "long": "55.367443", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:24.765375+55.367443", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Sanborn BESS 1", "city": "", "id": "171", "external_id": "64712", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "171", "external_id": "64712", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sanborn BESS 1", "external_id": "64712", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Terra-Gen Operating Co-BESS", "status": "operation", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ESSB1": {"first": {"year": "2021", "month": "8", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 1", "plant state": "CA", "plant id": "64712", "generator id": "ESSB1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64712", "date": "2021-08", "mw": 100}, "first_month": "2021-07", "changes": [{"month": "2021-09", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "9", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 1", "plant state": "CA", "plant id": "64712", "generator id": "ESSB1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64712", "date": "2021-09", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2021-09", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Sanborn BESS 1", "name_short": "Sanborn BESS 1", "owner": "Terra-Gen Operating Co-BESS", "state": "california", "country": "usa", "lat": "41.07261624691126", "long": "-121.45412015563981", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.07261624691126+-121.45412015563981", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lily Solar Hybrid", "city": "", "id": "251", "external_id": "63892", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Lily Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "251", "external_id": "63892", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lily Solar Hybrid", "external_id": "63892", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Lily Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LILYB": {"first": {"year": "2021", "month": "6", "entity id": "63549", "entity name": "Lily Solar, LLC", "plant producer type": "IPP", "plant name": "Lily Solar Hybrid", "plant state": "TX", "plant id": "63892", "generator id": "LILYB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63892", "date": "2021-06", "mw": 50}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "9", "entity id": "63549", "entity name": "Lily Solar, LLC", "plant producer type": "IPP", "plant name": "Lily Solar Hybrid", "plant state": "TX", "plant id": "63892", "generator id": "LILYB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63892", "date": "2021-09", "mw": 50}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-09", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Lily Solar Hybrid", "name_short": "Lily Solar", "owner": "Lily Solar, LLC", "state": "texas", "country": "usa", "lat": "33.416353926686256", "long": "-95.389466894988", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.416353926686256+-95.389466894988", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McCoy Storage Project", "city": "Riverside County", "id": "66", "external_id": "58462", "state": "california", "country": "usa", "capacity_mwh": "920", "estimate_mwh": "", "power_mw": "230", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.664118", "long": "-114.749852", "coords_hint": "1", "use_case": "250MW solar farm support", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "", "link3": "", "link4": ""}, "internal_id": "66", "external_id": "58462", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McCoy Solar Energy Project Hybrid", "external_id": "58462", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 460, "power_mw": 230, "owner": "McCoy Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2021-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MCST1": {"first": {"year": "2021", "month": "7", "entity id": "58451", "entity name": "McCoy Solar, LLC", "plant producer type": "IPP", "plant name": "McCoy Solar Energy Project Hybrid", "plant state": "CA", "plant id": "58462", "generator id": "MCST1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58462", "date": "2021-07", "mw": 230}, "first_month": "2020-09", "changes": [{"month": "2021-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "7", "entity id": "58451", "entity name": "McCoy Solar, LLC", "plant producer type": "IPP", "plant name": "McCoy Solar Energy Project Hybrid", "plant state": "CA", "plant id": "58462", "generator id": "MCST1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "58462", "date": "2021-07", "mw": 230}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-04"}, "month_disappeared": ""}}, "mw": 230, "mwh_is_estimate": false, "mwh": 920, "mwh_estimate": 460, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2021-07", "start_estimated": "", "month_disappeared": "", "go_live": "2021-07", "go_live_year_int": 2021, "name": "McCoy Solar Energy Project Hybrid", "name_short": "McCoy Solar Energy", "owner": "McCoy Solar, LLC", "state": "california", "country": "usa", "lat": "33.664118", "long": "-114.749852", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.664118+-114.749852", "construction_time_month": 3, "construction_speed_mwh_per_month": 306, "no_of_battery_units": 0, "notes_split": ["part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex"], "links": ["https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ringo-Vingeanne", "city": "Jalancourt", "id": "94", "external_id": "", "state": "Cote-d\u2019or", "country": "france", "capacity_mwh": "24", "estimate_mwh": "", "power_mw": "12", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Nidec ASI", "type": "40ft container", "cells": "LG Chem NMC", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-10-01", "start_operation": "2021-07-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "47.510967", "long": "5.367566", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "rte website and energy storage news list two different capacities for site ** exact location from rte press photo which is close to lake ** 2021: it is an expirment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/actualites/le-projet-ringo-de-rte-accueille-ses-premiers-equipements-en-cote-dor", "link3": "https://www.energy-storage.news/french-grid-operators-software-controlled-battery-experiment-begins/", "link4": ""}, "internal_id": "94", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 24, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2019-10-01", "start_operation": "2021-07-02", "start_estimated": "", "month_disappeared": "", "go_live": "2021-07", "go_live_year_int": 2021, "name": "Ringo-Vingeanne", "name_short": "Ringo-Vingeanne", "owner": "", "state": "Cote-d\u2019or", "country": "france", "lat": "47.510967", "long": "5.367566", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:47.510967+5.367566", "construction_time_month": 21, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": ["rte website and energy storage news list two different capacities for site ", " exact location from rte press photo which is close to lake ", " 2021: it is an expirment which lasts for 3 years"], "links": ["https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "https://www.rte-france.com/actualites/le-projet-ringo-de-rte-accueille-ses-premiers-equipements-en-cote-dor", "https://www.energy-storage.news/french-grid-operators-software-controlled-battery-experiment-begins/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gambit", "city": "angleton / houston", "id": "6", "external_id": "64528", "state": "texas", "country": "usa", "capacity_mwh": "175", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-08", "start_construction": "2021-03-08", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.168189", "long": "-95.445369", "coords_hint": "1", "use_case": "tesla as energy providor", "notes": "drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger", "project_website": "https://www.gambit-energystorage.com/", "link1": "https://www.teslarati.com/tesla-texas-big-battery-report/", "link2": "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "link3": "https://www.youtube.com/watch?v=OottNRdebs8", "link4": "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"}, "internal_id": "6", "external_id": "64528", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gambit Energy Storage - Angleton Storage", "external_id": "64528", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Tesla Inc.", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2021", "month": "6", "entity id": "60947", "entity name": "Tesla Inc.", "plant producer type": "IPP", "plant name": "Gambit Energy Storage - Angleton Storage", "plant state": "TX", "plant id": "64528", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64528", "date": "2021-06", "mw": 100}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "6", "entity id": "60947", "entity name": "Tesla Inc.", "plant producer type": "IPP", "plant name": "Gambit Energy Storage - Angleton Storage", "plant state": "TX", "plant id": "64528", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64528", "date": "2021-06", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-04", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 175, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Gambit Energy Storage - Angleton Storage", "name_short": "Gambit Energy Storage - Angleton", "owner": "Tesla Inc.", "state": "texas", "country": "usa", "lat": "29.168189", "long": "-95.445369", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:29.168189+-95.445369", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger"], "links": ["https://www.teslarati.com/tesla-texas-big-battery-report/", "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "https://www.youtube.com/watch?v=OottNRdebs8", "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Malita", "city": "Malita", "id": "77", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "6.398523", "long": "125.617282", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/fluence-completes-first-projects-in-470mw-470mwh-philippines-battery-order/", "link2": "", "link3": "", "link4": ""}, "internal_id": "77", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-09", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Malita", "name_short": "Malita", "owner": "", "state": "", "country": "philippines", "lat": "6.398523", "long": "125.617282", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:6.398523+125.617282", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/fluence-completes-first-projects-in-470mw-470mwh-philippines-battery-order/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Toledo", "city": "Toledo", "id": "78", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "10.388901", "long": "123.642096", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "link2": "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/", "link3": "", "link4": ""}, "internal_id": "78", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Toledo", "name_short": "Toledo", "owner": "", "state": "", "country": "philippines", "lat": "10.388901", "long": "123.642096", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:10.388901+123.642096", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Limay", "city": "Limay / Bataan", "id": "79", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "40", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "14.545475", "long": "120.599531", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "link2": "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/", "link3": "", "link4": ""}, "internal_id": "79", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 40, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Limay", "name_short": "Limay", "owner": "", "state": "", "country": "philippines", "lat": "14.545475", "long": "120.599531", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:14.545475+120.599531", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oxford Energy Superhub", "city": "Cowley / Oxford", "id": "91", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Pivot Power (EDF Renewables)", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.709722", "long": "-1.189592", "coords_hint": "1", "use_case": "EV charging support", "notes": "Exact location from burnell website pictures", "project_website": "https://energysuperhuboxford.org/", "link1": "https://www.euractiv.com/section/electricity/news/uks-first-grid-scale-battery-storage-system-comes-online-in-oxford/", "link2": "https://www.burnell.uk.com/energy-superhub-oxford/", "link3": "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "link4": ""}, "internal_id": "91", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-24", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Oxford Energy Superhub", "name_short": "Oxford Energy Superhub", "owner": "Pivot Power (EDF Renewables)", "state": "", "country": "uk", "lat": "51.709722", "long": "-1.189592", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.709722+-1.189592", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Exact location from burnell website pictures"], "links": ["https://www.euractiv.com/section/electricity/news/uks-first-grid-scale-battery-storage-system-comes-online-in-oxford/", "https://www.burnell.uk.com/energy-superhub-oxford/", "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blythe Solar 110, LLC", "city": "", "id": "175", "external_id": "60093", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "63", "customer": "", "owner": "Blythe Solar 110, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "175", "external_id": "60093", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blythe Solar 110, LLC", "external_id": "60093", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 126, "power_mw": 63, "owner": "Blythe Solar 110, LLC", "status": "operation", "date_first_heard": "2021-02", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BES1": {"first": {"year": "2021", "month": "6", "entity id": "59842", "entity name": "Blythe Solar 110, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar 110, LLC", "plant state": "CA", "plant id": "60093", "generator id": "BES1", "net summer capacity (mw)": "63", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "60093", "date": "2021-06", "mw": 63}, "first_month": "2021-02", "changes": [{"month": "2021-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "6", "entity id": "59842", "entity name": "Blythe Solar 110, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar 110, LLC", "plant state": "CA", "plant id": "60093", "generator id": "BES1", "net summer capacity (mw)": "63", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60093", "date": "2021-06", "mw": 63}, "current_month": "2022-02", "dates": {"first_heard": "2021-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 63, "mwh_is_estimate": true, "mwh": 126, "mwh_estimate": 126, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Blythe Solar 110, LLC", "name_short": "Blythe Solar 110", "owner": "Blythe Solar 110, LLC", "state": "california", "country": "usa", "lat": "40.872677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.872677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Top Gun Energy Storage", "city": "", "id": "189", "external_id": "61366", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "189", "external_id": "61366", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Top Gun Energy Storage", "external_id": "61366", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TGES": {"first": {"year": "2021", "month": "1", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Top Gun Energy Storage", "plant state": "CA", "plant id": "61366", "generator id": "TGES", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "61366", "date": "2021-01", "mw": 30}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "date", "from": "2021-01", "to": "2021-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-02", "li": [{"name": "date", "from": "2021-03", "to": "2021-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2021-04", "to": "2021-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-05", "to": "2021-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-07", "to": "2021-06", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "6", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Top Gun Energy Storage", "plant state": "CA", "plant id": "61366", "generator id": "TGES", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61366", "date": "2021-06", "mw": 30}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Top Gun Energy Storage", "name_short": "Top Gun", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.23330508398623", "long": "-121.64052723283366", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.23330508398623+-121.64052723283366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Johanna Energy Center, LLC", "city": "", "id": "190", "external_id": "63843", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "190", "external_id": "63843", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Johanna Energy Center, LLC", "external_id": "63843", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Johanna Energy Center, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SASP1": {"first": {"year": "2020", "month": "10", "entity id": "63522", "entity name": "Santa Ana Storage 1", "plant producer type": "IPP", "plant name": "Johanna Energy Center, LLC", "plant state": "CA", "plant id": "63843", "generator id": "SASP1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63843", "date": "2020-10", "mw": 20}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2020-10", "to": "2021-01", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-02", "li": [{"name": "date", "from": "2021-01", "to": "2021-05", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-05", "to": "2021-08", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-08", "to": "2021-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "entity name", "from": "Santa Ana Storage 1", "to": "Johanna Energy Center, LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "6", "entity id": "63522", "entity name": "Johanna Energy Center, LLC", "plant producer type": "IPP", "plant name": "Johanna Energy Center, LLC", "plant state": "CA", "plant id": "63843", "generator id": "SASP1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63843", "date": "2021-06", "mw": 20}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Johanna Energy Center, LLC", "name_short": "Johanna Energy Center", "owner": "Johanna Energy Center, LLC", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.48004900000001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.48004900000001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Battle Mountain Solar Project", "city": "", "id": "232", "external_id": "61098", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "232", "external_id": "61098", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Battle Mountain Solar Project", "external_id": "61098", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Consolidated Edison Development Inc.", "status": "operation", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BMBS": {"first": {"year": "2021", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Battle Mountain Solar Project", "plant state": "NV", "plant id": "61098", "generator id": "BMBS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61098", "date": "2021-06", "mw": 25}, "first_month": "2021-09", "changes": [], "current": {"year": "2021", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Battle Mountain Solar Project", "plant state": "NV", "plant id": "61098", "generator id": "BMBS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61098", "date": "2021-06", "mw": 25}, "current_month": "2022-02", "dates": {"first_heard": "2021-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Battle Mountain Solar Project", "name_short": "Battle Mountain Solar", "owner": "Consolidated Edison Development Inc.", "state": "nevada", "country": "usa", "lat": "41.48226633376159", "long": "-114.990143767415", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.48226633376159+-114.990143767415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aikengall II Community Wind Farm Battery", "city": "", "id": "294", "external_id": "7015", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Community Wind Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "294", "external_id": "7015", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Aikengall II Community Wind Farm Battery", "external_id": "7015", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Community Wind Power", "status": "operation", "date_first_heard": "2019-07-04", "start_construction": "2020-12-01", "start_operation": "2021-06-01", "start_estimated": "", "month_disappeared": "", "lat": "55.907534", "long": "-2.513953", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7015", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Community Wind Power", "Site Name": "Aikengall II Community Wind Farm Battery", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4332", "Installed Capacity (MWelec)": "80.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "4.20", "No. of Turbines": "19", "Height of Turbines (m)": "145.00", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Aikengall II Community Wind Fa, Innerwick, Dunbar, Lothian", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH42 1", "X-coordinate": "367967", "Y-coordinate": "668389", "Planning Authority": "East Lothian Council", "Planning Application Reference": "18/00865/P", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/01/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/07/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.907534", "long": "-2.513953", "status": "planning", "mw": 80, "ext_id": "7015"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Turbine Capacity (MW)", "from": "4.20", "to": "4.2", "extra": "", "change_type": "misc"}, {"name": "Height of Turbines (m)", "from": "145.00", "to": "145", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Turbine Capacity (MW)", "from": "4.2", "to": "", "extra": "", "change_type": "misc"}, {"name": "No. of Turbines", "from": "19", "to": "", "extra": "", "change_type": "misc"}, {"name": "Height of Turbines (m)", "from": "145", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/12/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/06/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7015", "Record Last Updated (dd/mm/yyyy)": "27/03/2023", "Operator (or Applicant)": "Community Wind Power", "Site Name": "Aikengall II Community Wind Farm Battery", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4332", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Aikengall II Community Wind Fa, Innerwick, Dunbar, Lothian", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH42 1", "X-coordinate": "367967", "Y-coordinate": "668389", "Planning Authority": "East Lothian Council", "Planning Application Reference": "18/00865/P", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/01/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/07/2022", "Under Construction": "01/12/2020", "Operational": "01/06/2021", "Heat Network Ref": "", "lat": "55.907534", "long": "-2.513953", "status": "operation", "mw": 80, "ext_id": "7015"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-07-04", "start_construction": "2020-12-01", "start_operation": "2021-06-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Aikengall II Community Wind Farm Battery", "name_short": "Aikengall II Community Wind Farm Ba...", "owner": "Community Wind Power", "state": "scotland", "country": "uk", "lat": "55.907534", "long": "-2.513953", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.907534+-2.513953", "construction_time_month": 6, "construction_speed_mwh_per_month": 13, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dundee Technology Park", "city": "", "id": "424", "external_id": "7946", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-09", "start_construction": "", "start_operation": "2021-06-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "424", "external_id": "7946", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dundee Technology Park", "external_id": "7946", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gigabox Developments", "status": "operation", "date_first_heard": "2020-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.471983", "long": "-3.052845", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7946", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Gigabox Developments", "Site Name": "Dundee Technology Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land At Technology Park, South Road, Dundee, Tayside", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 4LX", "X-coordinate": "335237", "Y-coordinate": "731592", "Planning Authority": "Dundee City Council", "Planning Application Reference": "20/00239/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/04/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/10/2023", "Under Construction": "", "Operational": "21/06/2021", "Heat Network Ref": "", "lat": "56.471983", "long": "-3.052845", "status": "operation", "mw": 49, "ext_id": "7946"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "30/09/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "21/06/2021", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7946", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Gigabox Developments", "Site Name": "Dundee Technology Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Technology Park, South Road, Dundee, Tayside", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 4LX", "X-coordinate": "335237", "Y-coordinate": "731592", "Planning Authority": "Dundee City Council", "Planning Application Reference": "20/00239/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/04/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.471983", "long": "-3.052845", "status": "operation", "mw": 49, "ext_id": "7946"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-09", "start_construction": "", "start_operation": "2021-06-21", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Dundee Technology Park", "name_short": "Dundee Technology Park", "owner": "Gigabox Developments", "state": "scotland", "country": "uk", "lat": "56.471983", "long": "-3.052845", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.471983+-3.052845", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blythe III Storage Project", "city": "Riverside County", "id": "65", "external_id": "60094", "state": "california", "country": "usa", "capacity_mwh": "460", "estimate_mwh": "", "power_mw": "115", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Samsung", "type": "", "cells": "Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-02-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.673021", "long": "-114.754474", "coords_hint": "1", "use_case": "solar", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "", "link3": "", "link4": ""}, "internal_id": "65", "external_id": "60094", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blythe Solar III, LLC Hybrid", "external_id": "60094", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 230, "power_mw": 115, "owner": "Blythe Solar III, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BLST3": {"first": {"year": "2021", "month": "5", "entity id": "59844", "entity name": "Blythe Solar III, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar III, LLC Hybrid", "plant state": "CA", "plant id": "60094", "generator id": "BLST3", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "60094", "date": "2021-05", "mw": 115}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "5", "entity id": "59844", "entity name": "Blythe Solar III, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar III, LLC Hybrid", "plant state": "CA", "plant id": "60094", "generator id": "BLST3", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60094", "date": "2021-05", "mw": 115}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 115, "mwh_is_estimate": false, "mwh": 460, "mwh_estimate": 230, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-05", "start_estimated": "", "month_disappeared": "", "go_live": "2021-05", "go_live_year_int": 2021, "name": "Blythe Solar III, LLC Hybrid", "name_short": "Blythe Solar III", "owner": "Blythe Solar III, LLC", "state": "california", "country": "usa", "lat": "33.673021", "long": "-114.754474", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.673021+-114.754474", "construction_time_month": 6, "construction_speed_mwh_per_month": 76, "no_of_battery_units": 0, "notes_split": ["part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries"], "links": ["https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grissom Solar, LLC", "city": "", "id": "224", "external_id": "64450", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Grissom Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "224", "external_id": "64450", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Grissom Solar, LLC", "external_id": "64450", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Grissom Solar, LLC", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GSF02": {"first": {"year": "2021", "month": "5", "entity id": "64118", "entity name": "Grissom Solar, LLC", "plant producer type": "IPP", "plant name": "Grissom Solar, LLC", "plant state": "NC", "plant id": "64450", "generator id": "GSF02", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64450", "date": "2021-05", "mw": 10}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "5", "entity id": "64118", "entity name": "Grissom Solar, LLC", "plant producer type": "IPP", "plant name": "Grissom Solar, LLC", "plant state": "NC", "plant id": "64450", "generator id": "GSF02", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64450", "date": "2021-05", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2021-04", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-05", "start_estimated": "", "month_disappeared": "", "go_live": "2021-05", "go_live_year_int": 2021, "name": "Grissom Solar, LLC", "name_short": "Grissom Solar", "owner": "Grissom Solar, LLC", "state": "north carolina", "country": "usa", "lat": "36.447777234085784", "long": "-76.83727682472", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.447777234085784+-76.83727682472", "construction_time_month": -1, "construction_speed_mwh_per_month": -20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Saticoy", "city": "oxnard / los angeles", "id": "3", "external_id": "63891", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Arevon", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "142", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-06-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.25773", "long": "-119.158534", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "", "project_website": "", "link1": "https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "link2": "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "link3": "https://arevonenergy.com/location/saticoy/", "link4": ""}, "internal_id": "3", "external_id": "63891", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Saticoy", "external_id": "63891", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Ventura Energy Storage, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SATCY": {"first": {"year": "2021", "month": "4", "entity id": "63550", "entity name": "Ventura Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Saticoy", "plant state": "CA", "plant id": "63891", "generator id": "SATCY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63891", "date": "2021-04", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-04", "to": "2021-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-05", "to": "2021-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "4", "entity id": "63550", "entity name": "Ventura Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Saticoy", "plant state": "CA", "plant id": "63891", "generator id": "SATCY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63891", "date": "2021-04", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Saticoy", "name_short": "Saticoy", "owner": "Ventura Energy Storage, LLC", "state": "california", "country": "usa", "lat": "34.25773", "long": "-119.158534", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.25773+-119.158534", "construction_time_month": 5, "construction_speed_mwh_per_month": 80, "no_of_battery_units": 142, "notes_split": [""], "links": ["https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "https://arevonenergy.com/location/saticoy/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wilmot Energy Center LLC", "city": "", "id": "149", "external_id": "64426", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Wilmot Energy Center LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "149", "external_id": "64426", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wilmot Energy Center LLC", "external_id": "64426", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Wilmot Energy Center LLC", "status": "operation", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WILBA": {"first": {"year": "2021", "month": "5", "entity id": "64002", "entity name": "Wilmot Energy Center LLC", "plant producer type": "IPP", "plant name": "Wilmot Energy Center LLC", "plant state": "AZ", "plant id": "64426", "generator id": "WILBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64426", "date": "2021-05", "mw": 30}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-05", "to": "2021-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "4", "entity id": "64002", "entity name": "Wilmot Energy Center LLC", "plant producer type": "IPP", "plant name": "Wilmot Energy Center LLC", "plant state": "AZ", "plant id": "64426", "generator id": "WILBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64426", "date": "2021-04", "mw": 30}, "current_month": "2022-02", "dates": {"first_heard": "2021-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Wilmot Energy Center LLC", "name_short": "Wilmot Energy Center", "owner": "Wilmot Energy Center LLC", "state": "arizona", "country": "usa", "lat": "36.56433572443623", "long": "-110.14964771153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.56433572443623+-110.14964771153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Silverstrand Grid Energy Storage System", "city": "", "id": "193", "external_id": "63735", "state": "california", "country": "usa", "capacity_mwh": "46", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Silverstrand Grid, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.205195", "long": "-119.058256", "coords_hint": "3", "use_case": "", "notes": "Using 3.1MWh to get from the packs to capacity", "project_website": "", "link1": "https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/", "link2": "", "link3": "", "link4": ""}, "internal_id": "193", "external_id": "63735", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Silverstrand Grid Energy Storage System", "external_id": "63735", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "Silverstrand Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SLV01": {"first": {"year": "2021", "month": "3", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "plant producer type": "IPP", "plant name": "Silverstrand Grid Energy Storage System", "plant state": "CA", "plant id": "63735", "generator id": "SLV01", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63735", "date": "2021-03", "mw": 11}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-03", "to": "2021-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "4", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "plant producer type": "IPP", "plant name": "Silverstrand Grid Energy Storage System", "plant state": "CA", "plant id": "63735", "generator id": "SLV01", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63735", "date": "2021-04", "mw": 11}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": false, "mwh": 46, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Silverstrand Grid Energy Storage System", "name_short": "Silverstrand Grid", "owner": "Silverstrand Grid, LLC", "state": "california", "country": "usa", "lat": "34.205195", "long": "-119.058256", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.205195+-119.058256", "construction_time_month": 3, "construction_speed_mwh_per_month": 15, "no_of_battery_units": 15, "notes_split": ["Using 3.1MWh to get from the packs to capacity"], "links": ["https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "AES Kekaha Solar, LLC Hybrid", "city": "", "id": "218", "external_id": "63280", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "218", "external_id": "63280", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES Kekaha Solar, LLC Hybrid", "external_id": "63280", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 28, "power_mw": 14, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2020", "month": "9", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Kekaha Solar, LLC Hybrid", "plant state": "HI", "plant id": "63280", "generator id": "BESS", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "63280", "date": "2020-09", "mw": 14}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "date", "from": "2020-09", "to": "2021-04", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "4", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Kekaha Solar, LLC Hybrid", "plant state": "HI", "plant id": "63280", "generator id": "BESS", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63280", "date": "2021-04", "mw": 14}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 14, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "AES Kekaha Solar, LLC Hybrid", "name_short": "AES Kekaha Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.496639090550673", "long": "-155.3549676691025", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.496639090550673+-155.3549676691025", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blythe II Storage Project", "city": "Riverside County", "id": "64", "external_id": "60092", "state": "california", "country": "usa", "capacity_mwh": "460", "estimate_mwh": "", "power_mw": "115", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Samsung", "type": "", "cells": "Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2013-04-22", "start_construction": "", "start_operation": "2021-02-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.676313", "long": "-114.75575", "coords_hint": "1", "use_case": "solar", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "https://ieefa.org/nextera-brings-first-section-of-massive-california-battery-storage-complex-online/", "link3": "", "link4": ""}, "internal_id": "64", "external_id": "60092", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blythe Solar II, LLC", "external_id": "60092", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 230, "power_mw": 115, "owner": "Blythe Solar II, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BLST2": {"first": {"year": "2021", "month": "2", "entity id": "59843", "entity name": "Blythe Solar II, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar II, LLC", "plant state": "CA", "plant id": "60092", "generator id": "BLST2", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "60092", "date": "2021-02", "mw": 115}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-02", "to": "2021-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "3", "entity id": "59843", "entity name": "Blythe Solar II, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar II, LLC", "plant state": "CA", "plant id": "60092", "generator id": "BLST2", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60092", "date": "2021-03", "mw": 115}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 115, "mwh_is_estimate": false, "mwh": 460, "mwh_estimate": 230, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-03", "start_estimated": "", "month_disappeared": "", "go_live": "2021-03", "go_live_year_int": 2021, "name": "Blythe Solar II, LLC", "name_short": "Blythe Solar II", "owner": "Blythe Solar II, LLC", "state": "california", "country": "usa", "lat": "33.676313", "long": "-114.75575", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.676313+-114.75575", "construction_time_month": 4, "construction_speed_mwh_per_month": 115, "no_of_battery_units": 0, "notes_split": ["part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries"], "links": ["https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "https://ieefa.org/nextera-brings-first-section-of-massive-california-battery-storage-complex-online/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vallecito Energy Storage Resilience (VESR)", "city": "carpinteria / santa barbara county", "id": "11", "external_id": "62801", "state": "california", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Clean Coalition", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "2020-11-05", "start_operation": "2021-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.408083", "long": "-119.512937", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "link2": "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/", "link3": "", "link4": ""}, "internal_id": "11", "external_id": "62801", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vallecito", "external_id": "62801", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Viridity Energy Solutions, Inc.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ORN34": {"first": {"year": "2020", "month": "12", "entity id": "61522", "entity name": "Viridity Energy Solutions, Inc.", "plant producer type": "IPP", "plant name": "Vallecito", "plant state": "CA", "plant id": "62801", "generator id": "ORN34", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "62801", "date": "2020-12", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "date", "from": "2020-12", "to": "2021-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-03", "to": "2021-02", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "2", "entity id": "61522", "entity name": "Viridity Energy Solutions, Inc.", "plant producer type": "IPP", "plant name": "Vallecito", "plant state": "CA", "plant id": "62801", "generator id": "ORN34", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62801", "date": "2021-02", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11-05", "start_operation": "2021-02", "start_estimated": "", "month_disappeared": "", "go_live": "2021-02", "go_live_year_int": 2021, "name": "Vallecito", "name_short": "Vallecito", "owner": "Viridity Energy Solutions, Inc.", "state": "california", "country": "usa", "lat": "34.408083", "long": "-119.512937", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.408083+-119.512937", "construction_time_month": 3, "construction_speed_mwh_per_month": 13, "no_of_battery_units": 15, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Mardyck", "city": "Dunkirk", "id": "93", "external_id": "", "state": "", "country": "france", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "25", "customer": "RTE", "owner": "Total", "developer": "", "manufacturer": "Saft", "type": "Intensium Max 20 High Energy (20ft container)", "cells": "NMC", "no_of_battery_units": "11", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-02-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.029549", "long": "2.252929", "coords_hint": "2", "use_case": "frequency balancing", "notes": "saft is owned by total", "project_website": "", "link1": "https://www.energy-storage.news/frances-biggest-battery-storage-system-at-25mw-goes-into-operation/", "link2": "https://totalenergies.com/media/news/press-releases/total-build-largest-battery-based-energy-storage-project-france", "link3": "https://www.saftbatteries.com/products-solutions/products/intensium\ufffd-max-20-high-energy", "link4": ""}, "internal_id": "93", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 25, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-02-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-02", "go_live_year_int": 2021, "name": "Mardyck", "name_short": "Mardyck", "owner": "Total", "state": "", "country": "france", "lat": "51.029549", "long": "2.252929", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.029549+2.252929", "construction_time_month": 4, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 11, "notes_split": ["saft is owned by total"], "links": ["https://www.energy-storage.news/frances-biggest-battery-storage-system-at-25mw-goes-into-operation/", "https://totalenergies.com/media/news/press-releases/total-build-largest-battery-based-energy-storage-project-france", "https://www.saftbatteries.com/products-solutions/products/intensium\ufffd-max-20-high-energy"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamitos", "city": "Long Beach / Los Angeles", "id": "46", "external_id": "61204", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Southern California Edison (SCE)", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Advancion 5", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-06-01", "start_operation": "2021-01-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.770365", "long": "-118.101597", "coords_hint": "1", "use_case": "gas peaker plant replacement, 20 year ppa", "notes": "", "project_website": "", "link1": "https://blog.fluenceenergy.com/aes-fluence-commission-alamitos-energy-storage-facility-long-beach-california", "link2": "https://blog.fluenceenergy.com/fluence-aes-alamitos-battery-energy-storage-system-made-history", "link3": "https://www.energy-storage.news/battery-storage-as-peaking-capacity-how-alamitos-changed-the-game-for-california/", "link4": ""}, "internal_id": "46", "external_id": "61204", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES ES ALAMITOS, LLC", "external_id": "61204", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "AES ES Alamitos, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ALMTS": {"first": {"year": "2021", "month": "1", "entity id": "62160", "entity name": "AES ES Alamitos, LLC", "plant producer type": "IPP", "plant name": "AES ES ALAMITOS, LLC", "plant state": "CA", "plant id": "61204", "generator id": "ALMTS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "61204", "date": "2021-01", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "1", "entity id": "62160", "entity name": "AES ES Alamitos, LLC", "plant producer type": "IPP", "plant name": "AES ES ALAMITOS, LLC", "plant state": "CA", "plant id": "61204", "generator id": "ALMTS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61204", "date": "2021-01", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2019-06-01", "start_operation": "2021-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-01", "go_live_year_int": 2021, "name": "AES ES ALAMITOS, LLC", "name_short": "AES ES ALAMITOS", "owner": "AES ES Alamitos, LLC", "state": "california", "country": "usa", "lat": "33.770365", "long": "-118.101597", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.770365+-118.101597", "construction_time_month": 19, "construction_speed_mwh_per_month": 21, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://blog.fluenceenergy.com/aes-fluence-commission-alamitos-energy-storage-facility-long-beach-california", "https://blog.fluenceenergy.com/fluence-aes-alamitos-battery-energy-storage-system-made-history", "https://www.energy-storage.news/battery-storage-as-peaking-capacity-how-alamitos-changed-the-game-for-california/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Harvest II LLC", "city": "", "id": "187", "external_id": "64103", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "35", "customer": "", "owner": "Desert Harvest II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "187", "external_id": "64103", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Harvest II LLC", "external_id": "64103", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 70, "power_mw": 35, "owner": "Desert Harvest II LLC", "status": "operation", "date_first_heard": "2020-12", "start_construction": "2021-01", "start_operation": "2021-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DH003": {"first": {"year": "2020", "month": "12", "entity id": "63731", "entity name": "Desert Harvest II LLC", "plant producer type": "IPP", "plant name": "Desert Harvest II LLC", "plant state": "CA", "plant id": "64103", "generator id": "DH003", "net summer capacity (mw)": "35", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64103", "date": "2020-12", "mw": 35}, "first_month": "2020-12", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2020-12", "to": "2021-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-02", "to": "2021-01", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "1", "entity id": "63731", "entity name": "Desert Harvest II LLC", "plant producer type": "IPP", "plant name": "Desert Harvest II LLC", "plant state": "CA", "plant id": "64103", "generator id": "DH003", "net summer capacity (mw)": "35", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64103", "date": "2021-01", "mw": 35}, "current_month": "2022-02", "dates": {"first_heard": "2020-12", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 35, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-12", "start_construction": "2021-01", "start_operation": "2021-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-01", "go_live_year_int": 2021, "name": "Desert Harvest II LLC", "name_short": "Desert Harvest II", "owner": "Desert Harvest II LLC", "state": "california", "country": "usa", "lat": "41.37670833623373", "long": "-121.48461356921983", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.37670833623373+-121.48461356921983", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Minety", "city": "Minety", "id": "55", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "133", "estimate_mwh": "", "power_mw": "100", "customer": "Penso Power / China Huaneng Group / CNIC", "owner": "", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "LFP CATL, NMC Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-12-01", "start_operation": "2020-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.605997", "long": "-2.003146", "coords_hint": "1", "use_case": "", "notes": "PPA from shell, when second stage is complete it will be 150MW/266MWh", "project_website": "https://www.pensopower.com/", "link1": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-nsenergy-minety-55", "link2": "https://www.energy-storage.news/what-we-know-about-europes-largest-grid-connected-battery-project-so-far/", "link3": "https://eclipsepower.co.uk/project/minety-battery-storage/", "link4": ""}, "internal_id": "55", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 133, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2019-12-01", "start_operation": "2020-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2020-12", "go_live_year_int": 2020, "name": "Minety", "name_short": "Minety", "owner": "", "state": "", "country": "uk", "lat": "51.605997", "long": "-2.003146", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.605997+-2.003146", "construction_time_month": 12, "construction_speed_mwh_per_month": 11, "no_of_battery_units": 0, "notes_split": ["PPA from shell, when second stage is complete it will be 150MW/266MWh"], "links": ["https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-nsenergy-minety-55", "https://www.energy-storage.news/what-we-know-about-europes-largest-grid-connected-battery-project-so-far/", "https://eclipsepower.co.uk/project/minety-battery-storage/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Big Battery Lausitz", "city": "", "id": "526", "external_id": "SEE905930139120", "state": "brandenburg", "country": "germany", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "66", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "526", "external_id": "SEE905930139120", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Big Battery Lausitz", "external_id": "SEE905930139120", "state": "brandenburg", "country": "germany", "mwh": 52, "estimate_mwh": "", "power_mw": 66, "owner": "Lausitz Energie Kraftwerke AG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": "", "month_disappeared": "", "lat": "51.531359", "long": "14.348723", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2725831"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE905930139120", "DatumLetzteAktualisierung": "2021-05-05T12:35:57.5832256", "LokationMaStRNummer": "SEL981397405626", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-05-06", "AnlagenbetreiberMastrNummer": "ABR967895852209", "Land": "84", "Bundesland": "1400", "Landkreis": "Spree-Nei\u00dfe", "Gemeinde": "Spremberg", "Gemeindeschluessel": "12071372", "Postleitzahl": "03130", "Strasse": "An der alten Ziegelei", "StrasseNichtGefunden": "0", "Hausnummer": "1", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Spremberg", "Laengengrad": "14.348723", "Breitengrad": "51.531359", "Registrierungsdatum": "2020-12-03", "Inbetriebnahmedatum": "2020-11-19", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Big Battery Lausitz", "Weic": "11W0-0000-0206-W", "Weic_nv": "0", "WeicDisplayName": "KSP__BIG_BATT_L", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "66000.000", "Nettonennleistung": "66000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911931000004", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE985859962276", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "76440.000", "SpeMastrNummer": "SSE911582588209", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 52, "pr_url_id": "2725831", "ext_id": "SEE905930139120", "mw": 66, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE905930139120", "DatumLetzteAktualisierung": "2021-05-05T12:35:57.5832256", "LokationMaStRNummer": "SEL981397405626", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-05-06", "AnlagenbetreiberMastrNummer": "ABR967895852209", "Land": "84", "Bundesland": "1400", "Landkreis": "Spree-Nei\u00dfe", "Gemeinde": "Spremberg", "Gemeindeschluessel": "12071372", "Postleitzahl": "03130", "Strasse": "An der alten Ziegelei", "StrasseNichtGefunden": "0", "Hausnummer": "1", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Spremberg", "Laengengrad": "14.348723", "Breitengrad": "51.531359", "Registrierungsdatum": "2020-12-03", "Inbetriebnahmedatum": "2020-11-19", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Big Battery Lausitz", "Weic": "11W0-0000-0206-W", "Weic_nv": "0", "WeicDisplayName": "KSP__BIG_BATT_L", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "66000.000", "Nettonennleistung": "66000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911931000004", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE985859962276", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "76440.000", "SpeMastrNummer": "SSE911582588209", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2725831", "owner": "Lausitz Energie Kraftwerke AG", "mwh": 52, "ext_id": "SEE905930139120", "mw": 66, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": ""}}, "mw": 66, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": "", "month_disappeared": "", "go_live": "2020-11", "go_live_year_int": 2020, "name": "Big Battery Lausitz", "name_short": "Big Battery Lausitz", "owner": "Lausitz Energie Kraftwerke AG", "state": "brandenburg", "country": "germany", "lat": "51.531359", "long": "14.348723", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.531359+14.348723", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2725831"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "WindCharger", "city": "", "id": "16", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "10", "customer": "TransAlta", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "9", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "49.582737", "long": "-113.794235", "coords_hint": "1", "use_case": "wind farm support", "notes": "", "project_website": "", "link1": "https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "link2": "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "link3": "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf", "link4": ""}, "internal_id": "16", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "month_disappeared": "", "go_live": "2020-10", "go_live_year_int": 2020, "name": "WindCharger", "name_short": "WindCharger", "owner": "", "state": "alberta", "country": "canada", "lat": "49.582737", "long": "-113.794235", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.582737+-113.794235", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 9, "notes_split": [""], "links": ["https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "ngen slovenia 2", "city": "Kidrievo", "id": "21", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "15", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "12", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.391223", "long": "15.78985", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/", "link2": "", "link3": "", "link4": ""}, "internal_id": "21", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 15, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "month_disappeared": "", "go_live": "2020-10", "go_live_year_int": 2020, "name": "ngen slovenia 2", "name_short": "ngen slovenia 2", "owner": "", "state": "", "country": "slovenia", "lat": "46.391223", "long": "15.78985", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.391223+15.78985", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 12, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Holes Bay", "city": "Poole", "id": "17", "external_id": "", "state": "dorset", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "7.5", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures BV ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "link2": "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "link3": "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "link4": "https://frv.com/en/projects/holes-bay/"}, "internal_id": "17", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 7, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "month_disappeared": "", "go_live": "2020-09", "go_live_year_int": 2020, "name": "Holes Bay", "name_short": "Holes Bay", "owner": "", "state": "dorset", "country": "uk", "lat": "50.726395", "long": "-1.9901", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.726395+-1.9901", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 6, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "https://frv.com/en/projects/holes-bay/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Nether Moor Field", "city": "", "id": "305", "external_id": "7019", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Thurcroft Energy (Max Design Consultancy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "305", "external_id": "7019", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Nether Moor Field", "external_id": "7019", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Thurcroft Energy (Max Design Consultancy)", "status": "operation", "date_first_heard": "2019-11-22", "start_construction": "", "start_operation": "2020-09-01", "start_estimated": "", "month_disappeared": "", "lat": "53.401251", "long": "-1.26828", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7019", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Thurcroft Energy (Max Design Consultancy)", "Site Name": "Nether Moor Field", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Nether Moor Field, Green Lane, Thurcroft, Rotherham, South Yorkshire", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S66", "X-coordinate": "448748", "Y-coordinate": "389630", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2017/1426", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.401251", "long": "-1.26828", "status": "planning", "mw": 49, "ext_id": "7019"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/11/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/09/2020", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/05/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7019", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Thurcroft Energy (Max Design Consultancy)", "Site Name": "Nether Moor Field", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Nether Moor Field, Green Lane, Thurcroft, Rotherham, South Yorkshire", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S66", "X-coordinate": "448748", "Y-coordinate": "389630", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2017/1426", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/11/2022", "Under Construction": "", "Operational": "01/09/2020", "Heat Network Ref": "", "lat": "53.401251", "long": "-1.26828", "status": "operation", "mw": 49, "ext_id": "7019"}, "current_month": "2024-01", "dates": {"first_heard": "2020-05-27", "start_construction": "", "start_operation": "2020-05-27"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-11-22", "start_construction": "", "start_operation": "2020-09-01", "start_estimated": "", "month_disappeared": "", "go_live": "2020-09", "go_live_year_int": 2020, "name": "Nether Moor Field", "name_short": "Nether Moor Field", "owner": "Thurcroft Energy (Max Design Consultancy)", "state": "yorkshire and humber", "country": "uk", "lat": "53.401251", "long": "-1.26828", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.401251+-1.26828", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stanton Energy Reliability Center Hybrid", "city": "", "id": "195", "external_id": "60698", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Wellhead Energy, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "195", "external_id": "60698", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Stanton Energy Reliability Center Hybrid", "external_id": "60698", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Wellhead Energy, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2020", "month": "9", "entity id": "20323", "entity name": "Wellhead Energy, LLC", "plant producer type": "IPP", "plant name": "Stanton Energy Reliability Center Hybrid", "plant state": "CA", "plant id": "60698", "generator id": "BESS1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(OT) Other", "ext_id": "60698", "date": "2020-09", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(OT) Other", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2020-09", "to": "2020-08", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2020", "month": "8", "entity id": "20323", "entity name": "Wellhead Energy, LLC", "plant producer type": "IPP", "plant name": "Stanton Energy Reliability Center Hybrid", "plant state": "CA", "plant id": "60698", "generator id": "BESS1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60698", "date": "2020-08", "mw": 10}, "current_month": "2021-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}, "BESS2": {"first": {"year": "2020", "month": "9", "entity id": "20323", "entity name": "Wellhead Energy, LLC", "plant producer type": "IPP", "plant name": "Stanton Energy Reliability Center Hybrid", "plant state": "CA", "plant id": "60698", "generator id": "BESS2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(OT) Other", "ext_id": "60698", "date": "2020-09", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(OT) Other", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2020-09", "to": "2020-08", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2020", "month": "8", "entity id": "20323", "entity name": "Wellhead Energy, LLC", "plant producer type": "IPP", "plant name": "Stanton Energy Reliability Center Hybrid", "plant state": "CA", "plant id": "60698", "generator id": "BESS2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60698", "date": "2020-08", "mw": 10}, "current_month": "2021-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-08", "start_estimated": "", "month_disappeared": "", "go_live": "2020-08", "go_live_year_int": 2020, "name": "Stanton Energy Reliability Center Hybrid", "name_short": "Stanton Energy Reliability Center", "owner": "Wellhead Energy, LLC", "state": "california", "country": "usa", "lat": "40.832677000000004", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.832677000000004+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fideoak Mills", "city": "", "id": "343", "external_id": "7152", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Kiwi Power (formerly Taunton Battery Storage)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-02-23", "start_construction": "2019-09-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "343", "external_id": "7152", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fideoak Mills", "external_id": "7152", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Kiwi Power (formerly Taunton Battery Storage)", "status": "operation", "date_first_heard": "2017-02-23", "start_construction": "2019-09-01", "start_operation": "2020-08-01", "start_estimated": "", "month_disappeared": "", "lat": "51.020082", "long": "-3.154791", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7152", "Record Last Updated (dd/mm/yyyy)": "21/02/2020", "Operator (or Applicant)": "Kiwi Power (formerly Taunton Battery Storage)", "Site Name": "Fideoak Mills", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Fideoak Mills, Upcott Road, Bishops Hull, Taunton, Somerset", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA4 1AF", "X-coordinate": "319099", "Y-coordinate": "125158", "Planning Authority": "Taunton Deane Borough Council", "Planning Application Reference": "05/16/0056", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/02/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.020082", "long": "-3.154791", "status": "construction", "mw": 30, "ext_id": "7152"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/02/2020", "to": "21/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/08/2020", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "21/09/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7152", "Record Last Updated (dd/mm/yyyy)": "21/09/2022", "Operator (or Applicant)": "Kiwi Power (formerly Taunton Battery Storage)", "Site Name": "Fideoak Mills", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fideoak Mills, Upcott Road, Bishops Hull, Taunton, Somerset", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA4 1AF", "X-coordinate": "319099", "Y-coordinate": "125158", "Planning Authority": "Taunton Deane Borough Council", "Planning Application Reference": "05/16/0056", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/02/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2019", "Operational": "01/08/2020", "Heat Network Ref": "", "lat": "51.020082", "long": "-3.154791", "status": "operation", "mw": 30, "ext_id": "7152"}, "current_month": "2024-01", "dates": {"first_heard": "2020-02-21", "start_construction": "", "start_operation": "2022-09-21"}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-02-23", "start_construction": "2019-09-01", "start_operation": "2020-08-01", "start_estimated": "", "month_disappeared": "", "go_live": "2020-08", "go_live_year_int": 2020, "name": "Fideoak Mills", "name_short": "Fideoak Mills", "owner": "Kiwi Power (formerly Taunton Battery Storage)", "state": "south west", "country": "uk", "lat": "51.020082", "long": "-3.154791", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.020082+-3.154791", "construction_time_month": 11, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gateway ", "city": "East Otey Mesa / San Diego", "id": "48", "external_id": "63834", "state": "california", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "LG", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-09-01", "start_operation": "2020-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.570558", "long": "-116.910955", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://vimeo.com/429223580", "link3": "https://en.wikipedia.org/wiki/Gateway_Energy_Storage", "link4": ""}, "internal_id": "48", "external_id": "63834", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gateway Energy Storage System", "external_id": "63834", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Gateway Energy Storage, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GTWAY": {"first": {"year": "2020", "month": "7", "entity id": "63512", "entity name": "Gateway Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Gateway Energy Storage System", "plant state": "CA", "plant id": "63834", "generator id": "GTWAY", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63834", "date": "2020-07", "mw": 250}, "first_month": "2020-09", "changes": [], "current": {"year": "2020", "month": "7", "entity id": "63512", "entity name": "Gateway Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Gateway Energy Storage System", "plant state": "CA", "plant id": "63834", "generator id": "GTWAY", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63834", "date": "2020-07", "mw": 250}, "current_month": "2021-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 500, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2019-09-01", "start_operation": "2020-07", "start_estimated": "", "month_disappeared": "", "go_live": "2020-07", "go_live_year_int": 2020, "name": "Gateway Energy Storage System", "name_short": "Gateway", "owner": "Gateway Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.570558", "long": "-116.910955", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.570558+-116.910955", "construction_time_month": 10, "construction_speed_mwh_per_month": 25, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.lspower.com/project-map/", "https://vimeo.com/429223580", "https://en.wikipedia.org/wiki/Gateway_Energy_Storage"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Solaseado", "city": "Haenam County", "id": "54", "external_id": "", "state": "jeolla", "country": "south korea", "capacity_mwh": "305", "estimate_mwh": "", "power_mw": "72", "customer": "Kospo", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-04-10", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.709899", "long": "126.41275", "coords_hint": "1", "use_case": "98MW solar farm support", "notes": "not sure whether Solaseado or Solasido is correct spelling", "project_website": "", "link1": "https://krenewables.com/solar/kospo-ignites-koreas-biggest-pv-farm/", "link2": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "link3": "", "link4": ""}, "internal_id": "54", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 72, "mwh_is_estimate": false, "mwh": 305, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-04-10", "start_estimated": "", "month_disappeared": "", "go_live": "2020-04", "go_live_year_int": 2020, "name": "Solaseado", "name_short": "Solaseado", "owner": "", "state": "jeolla", "country": "south korea", "lat": "34.709899", "long": "126.41275", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.709899+126.41275", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["not sure whether Solaseado or Solasido is correct spelling"], "links": ["https://krenewables.com/solar/kospo-ignites-koreas-biggest-pv-farm/", "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rush Springs Energy Storage (BA)", "city": "", "id": "238", "external_id": "63458", "state": "oklahoma", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Rush Springs Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-03-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "238", "external_id": "63458", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rush Springs Energy Storage (BA)", "external_id": "63458", "state": "oklahoma", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Rush Springs Energy Storage", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RUSHE": {"first": {"year": "2020", "month": "3", "entity id": "63187", "entity name": "Rush Springs Energy Storage", "plant producer type": "IPP", "plant name": "Rush Springs Energy Storage (BA)", "plant state": "OK", "plant id": "63458", "generator id": "RUSHE", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63458", "date": "2020-03", "mw": 10}, "first_month": "2020-09", "changes": [], "current": {"year": "2020", "month": "3", "entity id": "63187", "entity name": "Rush Springs Energy Storage", "plant producer type": "IPP", "plant name": "Rush Springs Energy Storage (BA)", "plant state": "OK", "plant id": "63458", "generator id": "RUSHE", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63458", "date": "2020-03", "mw": 10}, "current_month": "2021-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-03", "start_estimated": "", "month_disappeared": "", "go_live": "2020-03", "go_live_year_int": 2020, "name": "Rush Springs Energy Storage (BA)", "name_short": "Rush Springs Energy Storage (BA)", "owner": "Rush Springs Energy Storage", "state": "oklahoma", "country": "usa", "lat": "36.558188680458976", "long": "-95.03307098932751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.558188680458976+-95.03307098932751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bumpers Solar Farm ", "city": "", "id": "581", "external_id": "6913", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-12-01", "start_construction": "", "start_operation": "2020-03-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "581", "external_id": "6913", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bumpers Lane Solar Farm ", "external_id": "6913", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "Anesco", "status": "operation", "date_first_heard": "2021-12-01", "start_construction": "", "start_operation": "2020-03-16", "start_estimated": "", "month_disappeared": "", "lat": "51.752673", "long": "-0.892364", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6913", "Record Last Updated (dd/mm/yyyy)": "01/12/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Bumpers Lane Solar Farm ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6282", "Installed Capacity (MWelec)": "13.30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP27 9RE", "X-coordinate": "476556", "Y-coordinate": "206578", "Planning Authority": "Aylesbury Vale District Council", "Planning Application Reference": "14/A1926/NON", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "16/03/2020", "Heat Network Ref": "", "": "", "lat": "51.752673", "long": "-0.892364", "status": "operation", "mw": 13, "ext_id": "6913"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/12/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6913", "Record Last Updated (dd/mm/yyyy)": "01/12/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Bumpers Lane Solar Farm ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6282", "Installed Capacity (MWelec)": "13.3", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP27 9RE", "X-coordinate": "476556", "Y-coordinate": "206578", "Planning Authority": "Aylesbury Vale District Council", "Planning Application Reference": "14/A1926/NON", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "16/03/2020", "Heat Network Ref": "", "lat": "51.752673", "long": "-0.892364", "status": "operation", "mw": 13, "ext_id": "6913"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-12-01", "start_construction": "", "start_operation": "2020-03-16", "start_estimated": "", "month_disappeared": "", "go_live": "2020-03", "go_live_year_int": 2020, "name": "Bumpers Lane Solar Farm ", "name_short": "Bumpers Lane Solar Farm ", "owner": "Anesco", "state": "south east", "country": "uk", "lat": "51.752673", "long": "-0.892364", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.752673+-0.892364", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMAREG 1", "city": "", "id": "531", "external_id": "SEE931375347240", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "531", "external_id": "SEE931375347240", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "SMAREG 1", "external_id": "SEE931375347240", "state": "thuringia", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "SMAREG 1", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": "", "month_disappeared": "", "lat": "50.928557", "long": "10.709715", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3059314"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE931375347240", "DatumLetzteAktualisierung": "2021-08-11T04:38:55.4735351", "LokationMaStRNummer": "SEL978603447778", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2021-08-11", "AnlagenbetreiberMastrNummer": "ABR930916959300", "Land": "84", "Bundesland": "1415", "Landkreis": "Gotha", "Gemeinde": "Gotha", "Gemeindeschluessel": "16067029", "Postleitzahl": "99867", "Gemarkung": "Gotha", "FlurFlurstuecknummern": "20 60/20", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Gotha", "Laengengrad": "10.709715", "Breitengrad": "50.928557", "Registrierungsdatum": "2020-05-19", "Inbetriebnahmedatum": "2020-02-06", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "SMAREG 1", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911845000009", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE937314325966", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 10, "pr_url_id": "3059314", "ext_id": "SEE931375347240", "mw": 10, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-08", "li": [{"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-08-11", "to": "2022-05-20", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE931375347240", "DatumLetzteAktualisierung": "2021-08-11T04:38:55.4735351", "LokationMaStRNummer": "SEL978603447778", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-05-20", "AnlagenbetreiberMastrNummer": "ABR930916959300", "Land": "84", "Bundesland": "1415", "Landkreis": "Gotha", "Gemeinde": "Gotha", "Gemeindeschluessel": "16067029", "Postleitzahl": "99867", "Gemarkung": "Gotha", "FlurFlurstuecknummern": "20 60/20", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Gotha", "Laengengrad": "10.709715", "Breitengrad": "50.928557", "Registrierungsdatum": "2020-05-19", "Inbetriebnahmedatum": "2020-02-06", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "SMAREG 1", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911845000009", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE937314325966", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3059314", "owner": "SMAREG 1", "mwh": 10, "ext_id": "SEE931375347240", "mw": 10, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": "", "month_disappeared": "", "go_live": "2020-02", "go_live_year_int": 2020, "name": "SMAREG 1", "name_short": "SMAREG 1", "owner": "SMAREG 1", "state": "thuringia", "country": "germany", "lat": "50.928557", "long": "10.709715", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.928557+10.709715", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3059314"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lake Bonney Wind Farm", "city": "", "id": "28", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "25", "customer": "Infigen Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-37.738826", "long": "140.38693", "coords_hint": "1", "use_case": "278MW wind farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "link2": "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/", "link3": "", "link4": ""}, "internal_id": "28", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "month_disappeared": "", "go_live": "2020-01", "go_live_year_int": 2020, "name": "Lake Bonney Wind Farm", "name_short": "Lake Bonney Wind Farm", "owner": "", "state": "south australia", "country": "australia", "lat": "-37.738826", "long": "140.38693", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-37.738826+140.38693", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Land to the west of Clay Hill Pit / Larport Farm", "city": "", "id": "263", "external_id": "6911", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Anesco (formerly owned by Energy Reservoirs)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-11-18", "start_construction": "2019-01-01", "start_operation": "2020-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "263", "external_id": "6911", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land to the west of Clay Hill Pit / Larport Farm", "external_id": "6911", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Anesco (formerly owned by Energy Reservoirs)", "status": "operation", "date_first_heard": "2016-11-18", "start_construction": "2019-01-01", "start_operation": "2020-01-01", "start_estimated": "", "month_disappeared": "", "lat": "52.054041", "long": "-2.62195", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6911", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Anesco (formerly owned by Energy Reservoirs)", "Site Name": "Land to the west of Clay Hill Pit / Larport Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land West of Clay Hill Pit Larport Farm Larport Lane Dormington Herefordshire ", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR1 4EP", "X-coordinate": "357450", "Y-coordinate": "239700", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P162400/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/01/2019", "Operational": "01/01/2020", "Heat Network Ref": "", "lat": "52.054041", "long": "-2.62195", "status": "operation", "mw": 20, "ext_id": "6911"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Land West of Clay Hill Pit Larport Farm Larport Lane Dormington Herefordshire ", "to": "Land West of Clay Hill Pit Larport Farm Larport Lane Dormington ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/01/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6911", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Anesco (formerly owned by Energy Reservoirs)", "Site Name": "Land to the west of Clay Hill Pit / Larport Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land West of Clay Hill Pit Larport Farm Larport Lane Dormington ", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR1 4EP", "X-coordinate": "357450", "Y-coordinate": "239700", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P162400/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/01/2019", "Operational": "01/01/2020", "Heat Network Ref": "", "lat": "52.054041", "long": "-2.62195", "status": "operation", "mw": 20, "ext_id": "6911"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-11-18", "start_construction": "2019-01-01", "start_operation": "2020-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2020-01", "go_live_year_int": 2020, "name": "Land to the west of Clay Hill Pit / Larport Farm", "name_short": "Land to the west of Clay Hill Pit /...", "owner": "Anesco (formerly owned by Energy Reservoirs)", "state": "west midlands", "country": "uk", "lat": "52.054041", "long": "-2.62195", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.054041+-2.62195", "construction_time_month": 12, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Nantucket", "city": "Nantucket island", "id": "25", "external_id": "", "state": "massachusetts", "country": "usa", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "6", "customer": "National Grid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.258489", "long": "-70.051666", "coords_hint": "1", "use_case": "island", "notes": "", "project_website": "", "link1": "https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "link2": "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/", "link3": "", "link4": ""}, "internal_id": "25", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 6, "mwh_is_estimate": false, "mwh": 48, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "month_disappeared": "", "go_live": "2019-19", "go_live_year_int": 2019, "name": "Nantucket", "name_short": "Nantucket", "owner": "", "state": "massachusetts", "country": "usa", "lat": "41.258489", "long": "-70.051666", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.258489+-70.051666", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Yorkshire", "city": "yorkshire", "id": "56", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "27", "customer": "", "owner": "", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.949604", "long": "-1.190935", "coords_hint": "0", "use_case": "34MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/industry-updates/yorkshire-uk-europes-largest-unsubsidized-solar-plus-storage-project/", "link2": "", "link3": "", "link4": ""}, "internal_id": "56", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 27, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-12", "go_live_year_int": 2019, "name": "Yorkshire", "name_short": "Yorkshire", "owner": "", "state": "", "country": "uk", "lat": "53.949604", "long": "-1.190935", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.949604+-1.190935", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-tech.org/industry-updates/yorkshire-uk-europes-largest-unsubsidized-solar-plus-storage-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Boscar Grange Farm", "city": "", "id": "371", "external_id": "7332", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "27", "power_mw": "27", "customer": "", "owner": "Gridserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-11-29", "start_construction": "2019-05-23", "start_operation": "2019-12-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "371", "external_id": "7332", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Boscar Grange Farm", "external_id": "7332", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 27, "power_mw": 27, "owner": "Gridserve", "status": "operation", "date_first_heard": "2018-11-29", "start_construction": "2019-05-23", "start_operation": "2019-12-18", "start_estimated": "", "month_disappeared": "", "lat": "54.14446", "long": "-1.228101", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7332", "Record Last Updated (dd/mm/yyyy)": "02/01/2020", "Operator (or Applicant)": "Gridserve", "Site Name": "Boscar Grange Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5482", "Installed Capacity (MWelec)": "27.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Boscar Grange Farm, Thirsk Road, Easingwold, York, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO61 3NQ", "X-coordinate": "450521", "Y-coordinate": "472345", "Planning Authority": "Hambleton District Council", "Planning Application Reference": "18/02314/NMC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "23/05/2019", "Operational": "18/12/2019", "Heat Network Ref": "", "lat": "54.14446", "long": "-1.228101", "status": "operation", "mw": 27, "ext_id": "7332"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/01/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "18/12/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7332", "Record Last Updated (dd/mm/yyyy)": "18/12/2019", "Operator (or Applicant)": "Gridserve", "Site Name": "Boscar Grange Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5482", "Installed Capacity (MWelec)": "27", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Boscar Grange Farm, Thirsk Road, Easingwold, York, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO61 3NQ", "X-coordinate": "450521", "Y-coordinate": "472345", "Planning Authority": "Hambleton District Council", "Planning Application Reference": "18/02314/NMC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "23/05/2019", "Operational": "18/12/2019", "Heat Network Ref": "", "lat": "54.14446", "long": "-1.228101", "status": "operation", "mw": 27, "ext_id": "7332"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 27, "mwh_is_estimate": true, "mwh": 27, "mwh_estimate": 27, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-11-29", "start_construction": "2019-05-23", "start_operation": "2019-12-18", "start_estimated": "", "month_disappeared": "", "go_live": "2019-12", "go_live_year_int": 2019, "name": "Boscar Grange Farm", "name_short": "Boscar Grange Farm", "owner": "Gridserve", "state": "yorkshire and humber", "country": "uk", "lat": "54.14446", "long": "-1.228101", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.14446+-1.228101", "construction_time_month": 7, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "ngen slovenia 1", "city": "Jesenice", "id": "22", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "12", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.418237", "long": "14.10062", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.youtube.com/watch?v=v9j-2lsMcJ0", "link2": "", "link3": "", "link4": ""}, "internal_id": "22", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 22, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "month_disappeared": "", "go_live": "2019-10", "go_live_year_int": 2019, "name": "ngen slovenia 1", "name_short": "ngen slovenia 1", "owner": "", "state": "", "country": "slovenia", "lat": "46.418237", "long": "14.10062", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.418237+14.10062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.youtube.com/watch?v=v9j-2lsMcJ0"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Calow Green Farm", "city": "", "id": "350", "external_id": "7140", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy (formerly Enso Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "350", "external_id": "7140", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Calow Green Farm", "external_id": "7140", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Arlington Energy (formerly Enso Energy)", "status": "operation", "date_first_heard": "2019-01-25", "start_construction": "2019-04-01", "start_operation": "2019-10-01", "start_estimated": "", "month_disappeared": "", "lat": "53.221564", "long": "-1.374255", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7140", "Record Last Updated (dd/mm/yyyy)": "12/02/2020", "Operator (or Applicant)": "Arlington Energy (formerly Enso Energy)", "Site Name": "Calow Green Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Calow Green Farm, Calow Green, Calow, Chesterfield, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "S44 5XQ", "X-coordinate": "441877", "Y-coordinate": "369573", "Planning Authority": "North East Derbyshire District Council", "Planning Application Reference": "18/01011/FL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/09/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.221564", "long": "-1.374255", "status": "planning", "mw": 20, "ext_id": "7140"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/02/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2019", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2019", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "31/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7140", "Record Last Updated (dd/mm/yyyy)": "31/03/2023", "Operator (or Applicant)": "Arlington Energy (formerly Enso Energy)", "Site Name": "Calow Green Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Calow Green Farm, Calow Green, Calow, Chesterfield, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "S44 5XQ", "X-coordinate": "441877", "Y-coordinate": "369573", "Planning Authority": "North East Derbyshire District Council", "Planning Application Reference": "18/01011/FL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/09/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/01/2022", "Under Construction": "01/04/2019", "Operational": "01/10/2019", "Heat Network Ref": "", "lat": "53.221564", "long": "-1.374255", "status": "operation", "mw": 20, "ext_id": "7140"}, "current_month": "2024-01", "dates": {"first_heard": "2020-02-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-01-25", "start_construction": "2019-04-01", "start_operation": "2019-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-10", "go_live_year_int": 2019, "name": "Calow Green Farm", "name_short": "Calow Green Farm", "owner": "Arlington Energy (formerly Enso Energy)", "state": "east midlands", "country": "uk", "lat": "53.221564", "long": "-1.374255", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.221564+-1.374255", "construction_time_month": 6, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greenfield Road", "city": "", "id": "390", "external_id": "7570", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Arlington Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-03-23", "start_construction": "2019-06-19", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "390", "external_id": "7570", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clayhill Farm - Battery Energy Storage", "external_id": "7570", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 21, "power_mw": 21, "owner": "Enso Energy Limited", "status": "operation", "date_first_heard": "2018-03-23", "start_construction": "2019-05-01", "start_operation": "2019-10-01", "start_estimated": "", "month_disappeared": "", "lat": "51.985617", "long": "-0.490707", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7570", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Arlington Energy", "Site Name": "Greenfield Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "2265", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land at Clayhill Farm, Greenfield Road, Westoning, Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK45 5JD", "X-coordinate": "503744", "Y-coordinate": "232982", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/17/06006/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/12/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/03/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "19/06/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.985617", "long": "-0.490707", "status": "construction", "mw": 40, "ext_id": "7570"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/01/2020", "to": "26/01/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Arlington Energy", "to": "Enso Energy Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Greenfield Road", "to": "Clayhill Farm - Battery Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Co-located with RE", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}, {"name": "Storage Co-location REPD Ref ID", "from": "2265", "to": "", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "40.00", "to": "21.00", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "19/06/2019", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}, {"name": "mw", "from": 40, "to": 21, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/01/2022", "to": "14/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "23/03/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/05/2019", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/09/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7570", "Record Last Updated (dd/mm/yyyy)": "14/09/2022", "Operator (or Applicant)": "Enso Energy Limited", "Site Name": "Clayhill Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "21", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Clayhill Farm, Greenfield Road, Westoning, Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK45 5JD", "X-coordinate": "503744", "Y-coordinate": "232982", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/17/06006/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/12/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/03/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/03/2021", "Under Construction": "01/05/2019", "Operational": "01/10/2019", "Heat Network Ref": "", "lat": "51.985617", "long": "-0.490707", "status": "operation", "mw": 21, "ext_id": "7570"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-20", "start_construction": "", "start_operation": "2022-09-14"}, "month_disappeared": ""}, "mw": 21, "mwh_is_estimate": true, "mwh": 21, "mwh_estimate": 21, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-03-23", "start_construction": "2019-05-01", "start_operation": "2019-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-10", "go_live_year_int": 2019, "name": "Clayhill Farm - Battery Energy Storage", "name_short": "Clayhill Farm", "owner": "Enso Energy Limited", "state": "eastern", "country": "uk", "lat": "51.985617", "long": "-0.490707", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.985617+-0.490707", "construction_time_month": 5, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bloxwich Battery", "city": "", "id": "447", "external_id": "8160", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "41", "power_mw": "41", "customer": "", "owner": "Gresham House Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-04-01", "start_operation": "2019-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "447", "external_id": "8160", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bloxwich Battery", "external_id": "8160", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 41, "power_mw": 41, "owner": "Gresham House Energy Storage", "status": "operation", "date_first_heard": "2020-10-02", "start_construction": "2019-04-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.590088", "long": "-2.010024", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8160", "Record Last Updated (dd/mm/yyyy)": "02/10/2020", "Operator (or Applicant)": "Gresham House Energy Storage", "Site Name": "Bloxwich Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "41.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "UNIT 5, BLOXWICH LANE INDUSTRIAL ESTATE, BLOXWICH LANE, WALSALL, WS2 8TF", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS2 8TF", "X-coordinate": "399418", "Y-coordinate": "299143", "Planning Authority": "Walsall Council", "Planning Application Reference": "16/1536", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2019", "Operational": "01/07/2019", "Heat Network Ref": "", "lat": "52.590088", "long": "-2.010024", "status": "operation", "mw": 41, "ext_id": "8160"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/10/2020", "to": "30/09/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "01/07/2019", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8160", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Gresham House Energy Storage", "Site Name": "Bloxwich Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "41", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "UNIT 5, BLOXWICH LANE INDUSTRIAL ESTATE, BLOXWICH LANE, WALSALL, WS2 8TF", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS2 8TF", "X-coordinate": "399418", "Y-coordinate": "299143", "Planning Authority": "Walsall Council", "Planning Application Reference": "16/1536", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2019", "Operational": "", "Heat Network Ref": "", "lat": "52.590088", "long": "-2.010024", "status": "operation", "mw": 41, "ext_id": "8160"}, "current_month": "2024-01", "dates": {"first_heard": "2020-10-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 41, "mwh_is_estimate": true, "mwh": 41, "mwh_estimate": 41, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-02", "start_construction": "2019-04-01", "start_operation": "2019-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-07", "go_live_year_int": 2019, "name": "Bloxwich Battery", "name_short": "Bloxwich Battery", "owner": "Gresham House Energy Storage", "state": "west midlands", "country": "uk", "lat": "52.590088", "long": "-2.010024", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.590088+-2.010024", "construction_time_month": 3, "construction_speed_mwh_per_month": 13, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BES GRO", "city": "", "id": "544", "external_id": "SEE976362409624", "state": "saxony", "country": "germany", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "544", "external_id": "SEE976362409624", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "BES GRO", "external_id": "SEE976362409624", "state": "saxony", "country": "germany", "mwh": 25, "estimate_mwh": "", "power_mw": 16, "owner": "BES Groitzsch GmbH\uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": "", "month_disappeared": "", "lat": "51.140876", "long": "12.293085", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2562905"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE976362409624", "DatumLetzteAktualisierung": "2021-05-31T06:05:20.8194315", "LokationMaStRNummer": "SEL970721803719", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-05-31", "AnlagenbetreiberMastrNummer": "ABR976700826632", "Land": "84", "Bundesland": "1413", "Landkreis": "Leipzig", "Gemeinde": "Groitzsch", "Gemeindeschluessel": "14729170", "Postleitzahl": "04539", "Strasse": "Luckaer Stra\u00dfe", "StrasseNichtGefunden": "1", "Hausnummer": "29 z", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Groitzsch", "Laengengrad": "12.293085", "Breitengrad": "51.140876", "Registrierungsdatum": "2019-12-04", "Inbetriebnahmedatum": "2019-07-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BES GRO", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "17250.000", "Nettonennleistung": "16425.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "728", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16425.000", "SpeMastrNummer": "SSE988779675417", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 25, "pr_url_id": "2562905", "ext_id": "SEE976362409624", "mw": 16, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE976362409624", "DatumLetzteAktualisierung": "2021-05-31T06:05:20.8194315", "LokationMaStRNummer": "SEL970721803719", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-05-31", "AnlagenbetreiberMastrNummer": "ABR976700826632", "Land": "84", "Bundesland": "1413", "Landkreis": "Leipzig", "Gemeinde": "Groitzsch", "Gemeindeschluessel": "14729170", "Postleitzahl": "04539", "Strasse": "Luckaer Stra\u00dfe", "StrasseNichtGefunden": "1", "Hausnummer": "29 z", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Groitzsch", "Laengengrad": "12.293085", "Breitengrad": "51.140876", "Registrierungsdatum": "2019-12-04", "Inbetriebnahmedatum": "2019-07-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BES GRO", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "17250.000", "Nettonennleistung": "16425.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "728", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16425.000", "SpeMastrNummer": "SSE988779675417", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2562905", "owner": "BES Groitzsch GmbH\uff06 Co. KG", "mwh": 25, "ext_id": "SEE976362409624", "mw": 16, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": ""}}, "mw": 16, "mwh_is_estimate": false, "mwh": 25, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": "", "month_disappeared": "", "go_live": "2019-07", "go_live_year_int": 2019, "name": "BES GRO", "name_short": "BES GRO", "owner": "BES Groitzsch GmbH\uff06 Co. KG", "state": "saxony", "country": "germany", "lat": "51.140876", "long": "12.293085", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.140876+12.293085", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2562905"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Guildford electric buses", "city": "guildford", "id": "26", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "", "customer": "Zenobe Energy ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.205099", "long": "-0.581772", "coords_hint": "1", "use_case": "bus depot", "notes": "it is a stagecoach bus depot", "project_website": "", "link1": "https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "link2": "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/", "link3": "", "link4": ""}, "internal_id": "26", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "month_disappeared": "", "go_live": "2019-06", "go_live_year_int": 2019, "name": "Guildford electric buses", "name_short": "Guildford electric buses", "owner": "", "state": "", "country": "uk", "lat": "51.205099", "long": "-0.581772", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.205099+-0.581772", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": ["it is a stagecoach bus depot"], "links": ["https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Lascar Works ", "city": "", "id": "383", "external_id": "7464", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-03-26", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "383", "external_id": "7464", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lascar Works ", "external_id": "7464", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Anesco", "status": "operation", "date_first_heard": "2019-07-03", "start_construction": "2019-03-26", "start_operation": "2019-06-26", "start_estimated": "", "month_disappeared": "", "lat": "53.59751", "long": "-2.295057", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7464", "Record Last Updated (dd/mm/yyyy)": "03/07/2019", "Operator (or Applicant)": "Anesco", "Site Name": "Lascar Works ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Lascar Works, Tanpits Road, Bury, BL9 5BY", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BL9 5BY", "X-coordinate": "380570", "Y-coordinate": "411256", "Planning Authority": "Bury Metropolitan Borough Council", "Planning Application Reference": "62215", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "26/03/2019", "Operational": "26/06/2019", "Heat Network Ref": "", "lat": "53.59751", "long": "-2.295057", "status": "operation", "mw": 20, "ext_id": "7464"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Planning Application Reference", "from": "62215", "to": "62,215", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Planning Application Reference", "from": "62,215", "to": "62215", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/07/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/07/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7464", "Record Last Updated (dd/mm/yyyy)": "03/07/2019", "Operator (or Applicant)": "Anesco", "Site Name": "Lascar Works ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lascar Works, Tanpits Road, Bury, BL9 5BY", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BL9 5BY", "X-coordinate": "380570", "Y-coordinate": "411256", "Planning Authority": "Bury Metropolitan Borough Council", "Planning Application Reference": "62215", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "26/03/2019", "Operational": "26/06/2019", "Heat Network Ref": "", "lat": "53.59751", "long": "-2.295057", "status": "operation", "mw": 20, "ext_id": "7464"}, "current_month": "2024-01", "dates": {"first_heard": "2019-07-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-07-03", "start_construction": "2019-03-26", "start_operation": "2019-06-26", "start_estimated": "", "month_disappeared": "", "go_live": "2019-06", "go_live_year_int": 2019, "name": "Lascar Works ", "name_short": "Lascar Works ", "owner": "Anesco", "state": "north west", "country": "uk", "lat": "53.59751", "long": "-2.295057", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.59751+-2.295057", "construction_time_month": 3, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batteriespeicherkraftwerk", "city": "", "id": "532", "external_id": "SEE933095868289", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "532", "external_id": "SEE933095868289", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicherkraftwerk", "external_id": "SEE933095868289", "state": "schleswig-holstein", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "Versorgungsbetriebe Bordesholm GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": "", "month_disappeared": "", "lat": "54.174171", "long": "10.048530", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4273037"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE933095868289", "DatumLetzteAktualisierung": "2021-02-16T11:22:48.2894846", "LokationMaStRNummer": "SEL978210688311", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-16", "AnlagenbetreiberMastrNummer": "ABR911461408246", "Land": "84", "Bundesland": "1411", "Landkreis": "Rendsburg-Eckernf\u00f6rde", "Gemeinde": "Bordesholm", "Gemeindeschluessel": "01058022", "Postleitzahl": "24582", "Strasse": "Bahnhofstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "13", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bordesholm", "Laengengrad": "10.048530", "Breitengrad": "54.174171", "Registrierungsdatum": "2021-01-29", "Inbetriebnahmedatum": "2019-05-13", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicherkraftwerk", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einsatzort": "2400", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "1", "ZugeordnenteWirkleistungWechselrichter": "15750.000", "SpeMastrNummer": "SSE926907749890", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "4273037", "ext_id": "SEE933095868289", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE933095868289", "DatumLetzteAktualisierung": "2021-02-16T11:22:48.2894846", "LokationMaStRNummer": "SEL978210688311", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-16", "AnlagenbetreiberMastrNummer": "ABR911461408246", "Land": "84", "Bundesland": "1411", "Landkreis": "Rendsburg-Eckernf\u00f6rde", "Gemeinde": "Bordesholm", "Gemeindeschluessel": "01058022", "Postleitzahl": "24582", "Strasse": "Bahnhofstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "13", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bordesholm", "Laengengrad": "10.048530", "Breitengrad": "54.174171", "Registrierungsdatum": "2021-01-29", "Inbetriebnahmedatum": "2019-05-13", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicherkraftwerk", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einsatzort": "2400", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "1", "ZugeordnenteWirkleistungWechselrichter": "15750.000", "SpeMastrNummer": "SSE926907749890", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4273037", "owner": "Versorgungsbetriebe Bordesholm GmbH", "mwh": 15, "ext_id": "SEE933095868289", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": "", "month_disappeared": "", "go_live": "2019-05", "go_live_year_int": 2019, "name": "Batteriespeicherkraftwerk", "name_short": "Batteriespeicherkraftwerk", "owner": "Versorgungsbetriebe Bordesholm GmbH", "state": "schleswig-holstein", "country": "germany", "lat": "54.174171", "long": "10.048530", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.174171+10.048530", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4273037"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Asfordby Business Park (1)", "city": "", "id": "279", "external_id": "6932", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "23", "power_mw": "23", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "279", "external_id": "6932", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Asfordby Business Park (1)", "external_id": "6932", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 23, "power_mw": 23, "owner": "UK Power Reserve", "status": "operation", "date_first_heard": "2016-09-30", "start_construction": "2018-06-08", "start_operation": "2019-04-01", "start_estimated": "", "month_disappeared": "", "lat": "52.779301", "long": "-0.924335", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6932", "Record Last Updated (dd/mm/yyyy)": "28/04/2020", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Asfordby Business Park (1)", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "23.40", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, ", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE14 3JL", "X-coordinate": "472654", "Y-coordinate": "320733", "Planning Authority": "Melton Borough Council", "Planning Application Reference": "16/00522/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2019", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.779301", "long": "-0.924335", "status": "planning", "mw": 23, "ext_id": "6932"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, ", "to": "Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "08/06/2018", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/04/2019", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/04/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "28/04/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6932", "Record Last Updated (dd/mm/yyyy)": "28/04/2020", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Asfordby Business Park (1)", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "23.4", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, ", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE14 3JL", "X-coordinate": "472654", "Y-coordinate": "320733", "Planning Authority": "Melton Borough Council", "Planning Application Reference": "16/00522/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2019", "Under Construction": "08/06/2018", "Operational": "01/04/2019", "Heat Network Ref": "", "lat": "52.779301", "long": "-0.924335", "status": "operation", "mw": 23, "ext_id": "6932"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-28", "start_construction": "", "start_operation": "2020-04-28"}, "month_disappeared": ""}, "mw": 23, "mwh_is_estimate": true, "mwh": 23, "mwh_estimate": 23, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-09-30", "start_construction": "2018-06-08", "start_operation": "2019-04-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-04", "go_live_year_int": 2019, "name": "Asfordby Business Park (1)", "name_short": "Asfordby Business Park (1)", "owner": "UK Power Reserve", "state": "east midlands", "country": "uk", "lat": "52.779301", "long": "-0.924335", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.779301+-0.924335", "construction_time_month": 10, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Osaka Trains", "city": "Osaka", "id": "9", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "42", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.701231", "long": "135.494584", "coords_hint": "0", "use_case": "train station backup", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/telsa-powerpack-osaka-japan/", "link2": "", "link3": "", "link4": ""}, "internal_id": "9", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 12, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "month_disappeared": "", "go_live": "2019-03", "go_live_year_int": 2019, "name": "Osaka Trains", "name_short": "Osaka Trains", "owner": "", "state": "", "country": "japan", "lat": "34.701231", "long": "135.494584", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.701231+135.494584", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 42, "notes_split": [""], "links": ["https://www.teslarati.com/telsa-powerpack-osaka-japan/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hybridregelkraftwerk", "city": "", "id": "529", "external_id": "SEE913862454280", "state": "bremen", "country": "germany", "capacity_mwh": "14", "estimate_mwh": "", "power_mw": "18", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "529", "external_id": "SEE913862454280", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Hybridregelkraftwerk", "external_id": "SEE913862454280", "state": "bremen", "country": "germany", "mwh": 14, "estimate_mwh": "", "power_mw": 18, "owner": "swb Erzeugung AG \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": "", "month_disappeared": "", "lat": "53.058934", "long": "8.874096", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2023224"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE913862454280", "DatumLetzteAktualisierung": "2020-07-08T12:59:43.6915182", "LokationMaStRNummer": "SEL997991770299", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-23", "AnlagenbetreiberMastrNummer": "ABR901047920507", "Land": "84", "Bundesland": "1404", "Landkreis": "Bremen", "Gemeinde": "Bremen", "Gemeindeschluessel": "04011000", "Postleitzahl": "28207", "Strasse": "Hastedter Osterdeich", "StrasseNichtGefunden": "0", "Hausnummer": "255", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bremen", "Laengengrad": "8.874096", "Breitengrad": "53.058934", "Registrierungsdatum": "2019-07-03", "Inbetriebnahmedatum": "2019-03-11", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Hybridregelkraftwerk", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "18000.000", "Nettonennleistung": "18000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911945000008", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE963336172332", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "24000.000", "SpeMastrNummer": "SSE910097353135", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 14, "pr_url_id": "2023224", "ext_id": "SEE913862454280", "mw": 18, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-07-08T12:59:43.6915182", "to": "2022-02-03T10:32:33.3178725", "extra": "", "change_type": "misc"}, {"name": "Kraftwerksnummer_nv", "from": "1", "to": "0", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE913862454280", "DatumLetzteAktualisierung": "2022-02-03T10:32:33.3178725", "LokationMaStRNummer": "SEL997991770299", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-23", "AnlagenbetreiberMastrNummer": "ABR901047920507", "Land": "84", "Bundesland": "1404", "Landkreis": "Bremen", "Gemeinde": "Bremen", "Gemeindeschluessel": "04011000", "Postleitzahl": "28207", "Strasse": "Hastedter Osterdeich", "StrasseNichtGefunden": "0", "Hausnummer": "255", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bremen", "Laengengrad": "8.874096", "Breitengrad": "53.058934", "Registrierungsdatum": "2019-07-03", "Inbetriebnahmedatum": "2019-03-11", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Hybridregelkraftwerk", "Weic_nv": "1", "Kraftwerksnummer": "BNA1936", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "18000.000", "Nettonennleistung": "18000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911945000008", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE963336172332", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "24000.000", "SpeMastrNummer": "SSE910097353135", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2023224", "owner": "swb Erzeugung AG \uff06 Co. KG", "mwh": 14, "ext_id": "SEE913862454280", "mw": 18, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": ""}}, "mw": 18, "mwh_is_estimate": false, "mwh": 14, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": "", "month_disappeared": "", "go_live": "2019-03", "go_live_year_int": 2019, "name": "Hybridregelkraftwerk", "name_short": "Hybridregelkraftwerk", "owner": "swb Erzeugung AG \uff06 Co. KG", "state": "bremen", "country": "germany", "lat": "53.058934", "long": "8.874096", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.058934+8.874096", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2023224"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "70000000", "city": "", "id": "535", "external_id": "SEE940316838242", "state": "bavaria", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "535", "external_id": "SEE940316838242", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "70000000.00", "external_id": "SEE940316838242", "state": "bavaria", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 12, "owner": "ENGIE Deutschland GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": "", "month_disappeared": "", "lat": "49.552212", "long": "12.281245", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3638550"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE940316838242", "DatumLetzteAktualisierung": "2021-10-30T04:41:59.5544412", "LokationMaStRNummer": "SEL915124720911", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2021-10-30", "AnlagenbetreiberMastrNummer": "ABR942217905054", "Land": "84", "Bundesland": "1403", "Landkreis": "Neustadt a.d. Waldnaab", "Gemeinde": "T\u00e4nnesberg", "Gemeindeschluessel": "09374159", "Postleitzahl": "92723", "Strasse": "Tanzm\u00fchle", "StrasseNichtGefunden": "0", "Hausnummer": "4", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "T\u00e4nnesberg", "Laengengrad": "12.281245", "Breitengrad": "49.552212", "Registrierungsdatum": "2020-11-25", "Inbetriebnahmedatum": "2019-03-20", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "70000000.00", "Weic": "11W0-0000-0048-K", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "12500.000", "Nettonennleistung": "12500.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911883000003", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE934725099714", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "12500.000", "SpeMastrNummer": "SSE978006940074", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 10, "pr_url_id": "3638550", "ext_id": "SEE940316838242", "mw": 12, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-01", "li": [{"name": "DatumLetzteAktualisierung", "from": "2021-10-30T04:41:59.5544412", "to": "2021-12-16T16:44:50.4826401", "extra": "", "change_type": "misc"}, {"name": "LokationMaStRNummer", "from": "SEL915124720911", "to": "SEL934186465974", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-10-30", "to": "2021-12-16", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "NetzbetreiberpruefungStatus", "from": "1", "to": "0", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-12-16", "to": "2022-03-31", "extra": "", "change_type": "misc"}, {"name": "owner", "from": "ENGIE Deutschland GmbH", "to": "ENGIE Deutschland GmbH Gesch\u00e4ftsbereich Energy Services", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "DatumLetzteAktualisierung", "from": "2021-12-16T16:44:50.4826401", "to": "2022-07-25T12:53:41.6823712", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2022-03-31", "to": "2022-07-26", "extra": "", "change_type": "misc"}, {"name": "owner", "from": "ENGIE Deutschland GmbH Gesch\u00e4ftsbereich Energy Services", "to": "ENGIE Deutschland GmbH", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2022-07-26", "to": "2022-11-10", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE940316838242", "DatumLetzteAktualisierung": "2022-07-25T12:53:41.6823712", "LokationMaStRNummer": "SEL934186465974", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-11-10", "AnlagenbetreiberMastrNummer": "ABR942217905054", "Land": "84", "Bundesland": "1403", "Landkreis": "Neustadt a.d. Waldnaab", "Gemeinde": "T\u00e4nnesberg", "Gemeindeschluessel": "09374159", "Postleitzahl": "92723", "Strasse": "Tanzm\u00fchle", "StrasseNichtGefunden": "0", "Hausnummer": "4", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "T\u00e4nnesberg", "Laengengrad": "12.281245", "Breitengrad": "49.552212", "Registrierungsdatum": "2020-11-25", "Inbetriebnahmedatum": "2019-03-20", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "70000000.00", "Weic": "11W0-0000-0048-K", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "12500.000", "Nettonennleistung": "12500.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911883000003", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE934725099714", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "12500.000", "SpeMastrNummer": "SSE978006940074", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3638550", "owner": "ENGIE Deutschland GmbH", "mwh": 10, "ext_id": "SEE940316838242", "mw": 12, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": ""}}, "mw": 12, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": "", "month_disappeared": "", "go_live": "2019-03", "go_live_year_int": 2019, "name": "70000000.00", "name_short": "70000000.00", "owner": "ENGIE Deutschland GmbH", "state": "bavaria", "country": "germany", "lat": "49.552212", "long": "12.281245", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.552212+12.281245", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3638550"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Colorado ", "city": "Weld County", "id": "24", "external_id": "", "state": "colorado", "country": "usa", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "4", "customer": "United Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.577109", "long": "-104.40854", "coords_hint": "0", "use_case": "", "notes": "could not find exact location though it is operational", "project_website": "", "link1": "https://www.youtube.com/watch?v=dyAhUREGDzA", "link2": "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/", "link3": "", "link4": ""}, "internal_id": "24", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 4, "mwh_is_estimate": false, "mwh": 16, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "month_disappeared": "", "go_live": "2019-01", "go_live_year_int": 2019, "name": "Colorado ", "name_short": "Colorado ", "owner": "", "state": "colorado", "country": "usa", "lat": "40.577109", "long": "-104.40854", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.577109+-104.40854", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["could not find exact location though it is operational"], "links": ["https://www.youtube.com/watch?v=dyAhUREGDzA", "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Upton 2", "city": "Upton County", "id": "40", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "42", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.255119", "long": "-102.246596", "coords_hint": "0", "use_case": "180MW solar farm support", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://www.energy-storage.news/us-utility-vistra-plans-texas-solar-storage-facilities-alongside-6-8gw-of-coal-retirement-by-2027/", "link2": "https://www.luminant.com/upton-2-solar-power-plant-energy-storage-facility/", "link3": "", "link4": ""}, "internal_id": "40", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 42, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-31", "start_estimated": "", "month_disappeared": "", "go_live": "2018-12", "go_live_year_int": 2018, "name": "Upton 2", "name_short": "Upton 2", "owner": "", "state": "texas", "country": "usa", "lat": "31.255119", "long": "-102.246596", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.255119+-102.246596", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/us-utility-vistra-plans-texas-solar-storage-facilities-alongside-6-8gw-of-coal-retirement-by-2027/", "https://www.luminant.com/upton-2-solar-power-plant-energy-storage-facility/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Seosan", "city": "seosan", "id": "53", "external_id": "", "state": "", "country": "south korea", "capacity_mwh": "140", "estimate_mwh": "", "power_mw": "52", "customer": "", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.636988", "long": "126.363673", "coords_hint": "1", "use_case": "65MW solar farm support", "notes": "", "project_website": "", "link1": "https://en.wikipedia.org/wiki/Battery_storage_power_station", "link2": "", "link3": "", "link4": ""}, "internal_id": "53", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 52, "mwh_is_estimate": false, "mwh": 140, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-12", "go_live_year_int": 2018, "name": "Seosan", "name_short": "Seosan", "owner": "", "state": "", "country": "south korea", "lat": "36.636988", "long": "126.363673", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.636988+126.363673", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://en.wikipedia.org/wiki/Battery_storage_power_station"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carnegie Road", "city": "Liverpool", "id": "89", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Orsted", "developer": "", "manufacturer": "NEC Energy Solutions (LG)", "type": "40ft container", "cells": "", "no_of_battery_units": "3", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.419403", "long": "-2.928747", "coords_hint": "1", "use_case": "", "notes": "according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021 ** incident: fire at the site on 15.9.2020", "project_website": "https://orsted.com/en/our-business/solar-and-battery-storage/our-solar-and-storage-centers", "link1": "https://www.energy-storage.news/nec-delivers-orsteds-first-20mw-standalone-grid-battery-project/", "link2": "https://www.neces.com/experience#project-gallery", "link3": "https://www.energy-storage.news/fire-at-20mw-uk-battery-storage-plant-in-liverpool/", "link4": ""}, "internal_id": "89", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 12, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-12", "go_live_year_int": 2018, "name": "Carnegie Road", "name_short": "Carnegie Road", "owner": "Orsted", "state": "", "country": "uk", "lat": "53.419403", "long": "-2.928747", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419403+-2.928747", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 3, "notes_split": ["according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021 ", " incident: fire at the site on 15.9.2020"], "links": ["https://www.energy-storage.news/nec-delivers-orsteds-first-20mw-standalone-grid-battery-project/", "https://www.neces.com/experience#project-gallery", "https://www.energy-storage.news/fire-at-20mw-uk-battery-storage-plant-in-liverpool/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land at Carnegie Road", "city": "", "id": "345", "external_id": "7155", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "\ufffdrsted", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-12-15", "start_construction": "2018-10-24", "start_operation": "2018-12-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "345", "external_id": "7155", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land at Carnegie Road", "external_id": "7155", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "\ufffdrsted", "status": "operation", "date_first_heard": "2016-12-15", "start_construction": "2018-10-24", "start_operation": "2018-12-24", "start_estimated": "", "month_disappeared": "", "lat": "53.419931", "long": "-2.927637", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7155", "Record Last Updated (dd/mm/yyyy)": "02/01/2019", "Operator (or Applicant)": "\ufffdrsted", "Site Name": "Land at Carnegie Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Carnegie Road, Liverpool, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338448", "Y-coordinate": "391860", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "16F/2680", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "24/10/2018", "Operational": "24/12/2018", "Heat Network Ref": "", "lat": "53.419931", "long": "-2.927637", "status": "operation", "mw": 20, "ext_id": "7155"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "02/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7155", "Record Last Updated (dd/mm/yyyy)": "02/01/2019", "Operator (or Applicant)": "\ufffdrsted", "Site Name": "Land at Carnegie Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carnegie Road, Liverpool, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338448", "Y-coordinate": "391860", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "16F/2680", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "24/10/2018", "Operational": "24/12/2018", "Heat Network Ref": "", "lat": "53.419931", "long": "-2.927637", "status": "operation", "mw": 20, "ext_id": "7155"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-12-15", "start_construction": "2018-10-24", "start_operation": "2018-12-24", "start_estimated": "", "month_disappeared": "", "go_live": "2018-12", "go_live_year_int": 2018, "name": "Land at Carnegie Road", "name_short": "Land at Carnegie Road", "owner": "\ufffdrsted", "state": "north west", "country": "uk", "lat": "53.419931", "long": "-2.927637", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419931+-2.927637", "construction_time_month": 2, "construction_speed_mwh_per_month": 10, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gannawarra Solar Farm", "city": "", "id": "27", "external_id": "", "state": "victora", "country": "australia", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "25", "customer": "Edify Energy / Wirsol", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-35.734258", "long": "143.780015", "coords_hint": "1", "use_case": "60MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/", "link2": "", "link3": "", "link4": ""}, "internal_id": "27", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "Gannawarra Solar Farm", "name_short": "Gannawarra Solar Farm", "owner": "", "state": "victora", "country": "australia", "lat": "-35.734258", "long": "143.780015", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-35.734258+143.780015", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Roosecote", "city": "", "id": "264", "external_id": "6912", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Centrica", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-03-01", "start_operation": "2018-11-30", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "264", "external_id": "6912", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Roosecote", "external_id": "6912", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Centrica", "status": "operation", "date_first_heard": "2018-11-30", "start_construction": "2017-03-01", "start_operation": "2018-11-30", "start_estimated": "", "month_disappeared": "", "lat": "54.105223", "long": "-3.190031", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6912", "Record Last Updated (dd/mm/yyyy)": "30/11/2018", "Operator (or Applicant)": "Centrica", "Site Name": "Roosecote", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Roosecote coal and gas-fired power station, Barrow-in-Furness, Cumbria, UK, ", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "LA13 0PQ", "X-coordinate": "322288", "Y-coordinate": "468359", "Planning Authority": "Barrow in Furness Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2017", "Operational": "30/11/2018", "Heat Network Ref": "", "lat": "54.105223", "long": "-3.190031", "status": "operation", "mw": 49, "ext_id": "6912"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/11/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "30/11/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6912", "Record Last Updated (dd/mm/yyyy)": "30/11/2018", "Operator (or Applicant)": "Centrica", "Site Name": "Roosecote", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Roosecote coal and gas-fired power station, Barrow-in-Furness, Cumbria, UK, ", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "LA13 0PQ", "X-coordinate": "322288", "Y-coordinate": "468359", "Planning Authority": "Barrow in Furness Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2017", "Operational": "30/11/2018", "Heat Network Ref": "", "lat": "54.105223", "long": "-3.190031", "status": "operation", "mw": 49, "ext_id": "6912"}, "current_month": "2024-01", "dates": {"first_heard": "2018-11-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-11-30", "start_construction": "2017-03-01", "start_operation": "2018-11-30", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "Roosecote", "name_short": "Roosecote", "owner": "Centrica", "state": "north west", "country": "uk", "lat": "54.105223", "long": "-3.190031", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.105223+-3.190031", "construction_time_month": 20, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Creyke Beck", "city": "", "id": "338", "external_id": "7122", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-06-15", "start_construction": "2018-03-01", "start_operation": "2018-11-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "338", "external_id": "7122", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Creyke Beck", "external_id": "7122", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "operation", "date_first_heard": "2017-06-15", "start_construction": "2018-03-01", "start_operation": "2018-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.798272", "long": "-0.421018", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7122", "Record Last Updated (dd/mm/yyyy)": "28/01/2019", "Operator (or Applicant)": "Statera Energy", "Site Name": "Creyke Beck", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land to the south of, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504098", "Y-coordinate": "434708", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01372/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2018", "Operational": "01/11/2018", "Heat Network Ref": "", "lat": "53.798272", "long": "-0.421018", "status": "operation", "mw": 49, "ext_id": "7122"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "28/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7122", "Record Last Updated (dd/mm/yyyy)": "28/01/2019", "Operator (or Applicant)": "Statera Energy", "Site Name": "Creyke Beck", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south of, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504098", "Y-coordinate": "434708", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01372/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2018", "Operational": "01/11/2018", "Heat Network Ref": "", "lat": "53.798272", "long": "-0.421018", "status": "operation", "mw": 49, "ext_id": "7122"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-06-15", "start_construction": "2018-03-01", "start_operation": "2018-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "Creyke Beck", "name_short": "Creyke Beck", "owner": "Statera Energy", "state": "yorkshire and humber", "country": "uk", "lat": "53.798272", "long": "-0.421018", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.798272+-0.421018", "construction_time_month": 8, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BES BEN", "city": "", "id": "539", "external_id": "SEE963081865633", "state": "saxony", "country": "germany", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "539", "external_id": "SEE963081865633", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "BES BEN", "external_id": "SEE963081865633", "state": "saxony", "country": "germany", "mwh": 25, "estimate_mwh": "", "power_mw": 16, "owner": "BES Bennewitz GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": "", "month_disappeared": "", "lat": "51.356015", "long": "12.707130", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2562804"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE963081865633", "DatumLetzteAktualisierung": "2021-08-16T09:08:51.5029607", "LokationMaStRNummer": "SEL989511155808", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-08-16", "AnlagenbetreiberMastrNummer": "ABR921213385473", "Land": "84", "Bundesland": "1413", "Landkreis": "Leipzig", "Gemeinde": "Bennewitz", "Gemeindeschluessel": "14729030", "Postleitzahl": "04828", "Strasse": "Parkstra\u00dfe", "StrasseNichtGefunden": "1", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Bennewitz", "Laengengrad": "12.707130", "Breitengrad": "51.356015", "Registrierungsdatum": "2019-12-04", "Inbetriebnahmedatum": "2018-11-14", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BES BEN", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "16425.000", "Nettonennleistung": "16425.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "728", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16425.000", "SpeMastrNummer": "SSE940380794697", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 25, "pr_url_id": "2562804", "ext_id": "SEE963081865633", "mw": 16, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE963081865633", "DatumLetzteAktualisierung": "2021-08-16T09:08:51.5029607", "LokationMaStRNummer": "SEL989511155808", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-08-16", "AnlagenbetreiberMastrNummer": "ABR921213385473", "Land": "84", "Bundesland": "1413", "Landkreis": "Leipzig", "Gemeinde": "Bennewitz", "Gemeindeschluessel": "14729030", "Postleitzahl": "04828", "Strasse": "Parkstra\u00dfe", "StrasseNichtGefunden": "1", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Bennewitz", "Laengengrad": "12.707130", "Breitengrad": "51.356015", "Registrierungsdatum": "2019-12-04", "Inbetriebnahmedatum": "2018-11-14", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BES BEN", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "16425.000", "Nettonennleistung": "16425.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "728", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16425.000", "SpeMastrNummer": "SSE940380794697", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2562804", "owner": "BES Bennewitz GmbH \uff06 Co. KG", "mwh": 25, "ext_id": "SEE963081865633", "mw": 16, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": ""}}, "mw": 16, "mwh_is_estimate": false, "mwh": 25, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "BES BEN", "name_short": "BES BEN", "owner": "BES Bennewitz GmbH \uff06 Co. KG", "state": "saxony", "country": "germany", "lat": "51.356015", "long": "12.707130", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.356015+12.707130", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2562804"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Broxburn ", "city": "", "id": "262", "external_id": "6910", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-06", "start_construction": "2017-08-15", "start_operation": "2018-09-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "262", "external_id": "6910", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Broxburn ", "external_id": "6910", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Renewable Energy Systems (RES)", "status": "operation", "date_first_heard": "2017-03-06", "start_construction": "2017-08-15", "start_operation": "2018-09-15", "start_estimated": "", "month_disappeared": "", "lat": "55.919243", "long": "-3.455353", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6910", "Record Last Updated (dd/mm/yyyy)": "18/04/2019", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Broxburn ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land at Lookabootye, by Broxburn, adjacent to the Lookabootye substation.\n", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "309143", "Y-coordinate": "670530", "Planning Authority": "West Lothian Council", "Planning Application Reference": "LIVE/0502/FUL/16", "Appeal Reference": "PPA-400-2073", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "25/11/2016", "Appeal Lodged": "15/12/2016", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "06/03/2017", "Planning Permission Granted": "06/03/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/08/2017", "Operational": "15/09/2018", "Heat Network Ref": "", "lat": "55.919243", "long": "-3.455353", "status": "operation", "mw": 20, "ext_id": "6910"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/04/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "18/04/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6910", "Record Last Updated (dd/mm/yyyy)": "18/04/2019", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Broxburn ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Lookabootye, by Broxburn, adjacent to the Lookabootye substation.\n", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "309143", "Y-coordinate": "670530", "Planning Authority": "West Lothian Council", "Planning Application Reference": "LIVE/0502/FUL/16", "Appeal Reference": "PPA-400-2073", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "25/11/2016", "Appeal Lodged": "15/12/2016", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "06/03/2017", "Planning Permission Granted": "06/03/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/08/2017", "Operational": "15/09/2018", "Heat Network Ref": "", "lat": "55.919243", "long": "-3.455353", "status": "operation", "mw": 20, "ext_id": "6910"}, "current_month": "2024-01", "dates": {"first_heard": "2019-04-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-03-06", "start_construction": "2017-08-15", "start_operation": "2018-09-15", "start_estimated": "", "month_disappeared": "", "go_live": "2018-09", "go_live_year_int": 2018, "name": "Broxburn ", "name_short": "Broxburn ", "owner": "Renewable Energy Systems (RES)", "state": "scotland", "country": "uk", "lat": "55.919243", "long": "-3.455353", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.919243+-3.455353", "construction_time_month": 13, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Energiewende-Speicher", "city": "", "id": "533", "external_id": "SEE935506652999", "state": "lower saxony", "country": "germany", "capacity_mwh": "26", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "533", "external_id": "SEE935506652999", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Energiewende-Speicher", "external_id": "SEE935506652999", "state": "lower saxony", "country": "germany", "mwh": 26, "estimate_mwh": "", "power_mw": 11, "owner": "be.storaged GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": "", "month_disappeared": "", "lat": "53.375414", "long": "8.125477", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2940061"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE935506652999", "DatumLetzteAktualisierung": "2020-09-23T14:27:02.7620630", "LokationMaStRNummer": "SEL927843170113", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2020-09-23", "AnlagenbetreiberMastrNummer": "ABR999566358659", "Land": "84", "Bundesland": "1408", "Landkreis": "Friesland", "Gemeinde": "Varel", "Gemeindeschluessel": "03455026", "Postleitzahl": "26316", "Strasse": "Oldenburger Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "69 B", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Varel", "Laengengrad": "8.125477", "Breitengrad": "53.375414", "Registrierungsdatum": "2020-04-08", "Inbetriebnahmedatum": "2018-08-02", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Energiewende-Speicher", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "11900.000", "Nettonennleistung": "11900.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "0000000000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "730", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11900.000", "SpeMastrNummer": "SSE992131898185", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 26, "pr_url_id": "2940061", "ext_id": "SEE935506652999", "mw": 11, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-01", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2020-09-23", "to": "2021-12-28", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-09-23T14:27:02.7620630", "to": "2022-03-03T11:54:48.0427347", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-12-28", "to": "2022-04-27", "extra": "", "change_type": "misc"}, {"name": "Inbetriebnahmedatum", "from": "2018-08-02", "to": "2018-05-31", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE935506652999", "DatumLetzteAktualisierung": "2022-03-03T11:54:48.0427347", "LokationMaStRNummer": "SEL927843170113", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-04-27", "AnlagenbetreiberMastrNummer": "ABR999566358659", "Land": "84", "Bundesland": "1408", "Landkreis": "Friesland", "Gemeinde": "Varel", "Gemeindeschluessel": "03455026", "Postleitzahl": "26316", "Strasse": "Oldenburger Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "69 B", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Varel", "Laengengrad": "8.125477", "Breitengrad": "53.375414", "Registrierungsdatum": "2020-04-08", "Inbetriebnahmedatum": "2018-05-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Energiewende-Speicher", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "11900.000", "Nettonennleistung": "11900.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "0000000000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "730", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11900.000", "SpeMastrNummer": "SSE992131898185", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2940061", "owner": "be.storaged GmbH", "mwh": 26, "ext_id": "SEE935506652999", "mw": 11, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": ""}}, "mw": 11, "mwh_is_estimate": false, "mwh": 26, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": "", "month_disappeared": "", "go_live": "2018-08", "go_live_year_int": 2018, "name": "Energiewende-Speicher", "name_short": "Energiewende-Speicher", "owner": "be.storaged GmbH", "state": "lower saxony", "country": "germany", "lat": "53.375414", "long": "8.125477", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.375414+8.125477", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2940061"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Samoa", "city": "", "id": "30", "external_id": "", "state": "", "country": "samoa", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-13.885669", "long": "-171.884245", "coords_hint": "1", "use_case": "island", "notes": "2 locations at power station and airport", "project_website": "", "link1": "https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/", "link2": "", "link3": "", "link4": ""}, "internal_id": "30", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 13, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Samoa", "name_short": "Samoa", "owner": "", "state": "", "country": "samoa", "lat": "-13.885669", "long": "-171.884245", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-13.885669+-171.884245", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2 locations at power station and airport"], "links": ["https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Vista", "city": "Vista", "id": "49", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "40", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.20395", "long": "-117.253731", "coords_hint": "0", "use_case": "", "notes": "no source about the capacity", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://www.mapsearch.com/power-plant/vista-energy-storage-system/", "link3": "", "link4": ""}, "internal_id": "49", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 40, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Vista", "name_short": "Vista", "owner": "", "state": "california", "country": "usa", "lat": "33.20395", "long": "-117.253731", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.20395+-117.253731", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["no source about the capacity"], "links": ["https://www.lspower.com/project-map/", "https://www.mapsearch.com/power-plant/vista-energy-storage-system/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Port of Tyne", "city": "", "id": "282", "external_id": "6976", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Foresight", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2018-04-01", "start_operation": "2018-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "282", "external_id": "6976", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Port of Tyne", "external_id": "6976", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Foresight", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2018-04-01", "start_operation": "2018-07-01", "start_estimated": "", "month_disappeared": "", "lat": "54.977266", "long": "-1.455914", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6976", "Record Last Updated (dd/mm/yyyy)": "09/05/2019", "Operator (or Applicant)": "Foresight", "Site Name": "Port of Tyne", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Port of Tyne, Tyne Dock, South Shields, Tyne & Wear", "County": "Tyne and Wear", "Region": "North East", "Country": "England", "Post Code": "NE34 9PT", "X-coordinate": "434923", "Y-coordinate": "564875", "Planning Authority": "South Tyneside Metropolitan Borough Council", "Planning Application Reference": "ST/0867/16/FUL\ufffd", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2018", "Operational": "01/07/2018", "Heat Network Ref": "", "lat": "54.977266", "long": "-1.455914", "status": "operation", "mw": 35, "ext_id": "6976"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/05/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/05/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6976", "Record Last Updated (dd/mm/yyyy)": "09/05/2019", "Operator (or Applicant)": "Foresight", "Site Name": "Port of Tyne", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Port of Tyne, Tyne Dock, South Shields, Tyne & Wear", "County": "Tyne and Wear", "Region": "North East", "Country": "England", "Post Code": "NE34 9PT", "X-coordinate": "434923", "Y-coordinate": "564875", "Planning Authority": "South Tyneside Metropolitan Borough Council", "Planning Application Reference": "ST/0867/16/FUL\ufffd", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2018", "Operational": "01/07/2018", "Heat Network Ref": "", "lat": "54.977266", "long": "-1.455914", "status": "operation", "mw": 35, "ext_id": "6976"}, "current_month": "2024-01", "dates": {"first_heard": "2019-05-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-21", "start_construction": "2018-04-01", "start_operation": "2018-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Port of Tyne", "name_short": "Port of Tyne", "owner": "Foresight", "state": "north east", "country": "uk", "lat": "54.977266", "long": "-1.455914", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.977266+-1.455914", "construction_time_month": 3, "construction_speed_mwh_per_month": 11, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hybridspeicher AU", "city": "", "id": "524", "external_id": "SEE900291433160", "state": "bavaria", "country": "germany", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "524", "external_id": "SEE900291433160", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Hybridspeicher AU", "external_id": "SEE900291433160", "state": "bavaria", "country": "germany", "mwh": 8, "estimate_mwh": "", "power_mw": 16, "owner": "Allg\u00e4uer \u00dcberlandwerk GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": "", "month_disappeared": "", "lat": "47.685476", "long": "10.322080", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2377745"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE900291433160", "DatumLetzteAktualisierung": "2019-12-16T10:56:28.9742126", "LokationMaStRNummer": "SEL905749208932", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-01-27", "AnlagenbetreiberMastrNummer": "ABR917063786638", "Land": "84", "Bundesland": "1403", "Landkreis": "Oberallg\u00e4u", "Gemeinde": "Sulzberg", "Gemeindeschluessel": "09780140", "Postleitzahl": "87477", "Strasse": "Au", "StrasseNichtGefunden": "0", "Hausnummer": "7", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Sulzberg", "Laengengrad": "10.322080", "Breitengrad": "47.685476", "Registrierungsdatum": "2019-12-16", "Inbetriebnahmedatum": "2018-07-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Hybridspeicher AU", "Weic_nv": "1", "Kraftwerksnummer": "BNA1939", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "16000.000", "Nettonennleistung": "16000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9904254000009", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "BestandteilGrenzkraftwerk": "0", "ZugeordnenteWirkleistungWechselrichter": "16000.000", "SpeMastrNummer": "SSE991759625937", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 8, "pr_url_id": "2377745", "ext_id": "SEE900291433160", "mw": 16, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE900291433160", "DatumLetzteAktualisierung": "2019-12-16T10:56:28.9742126", "LokationMaStRNummer": "SEL905749208932", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-01-27", "AnlagenbetreiberMastrNummer": "ABR917063786638", "Land": "84", "Bundesland": "1403", "Landkreis": "Oberallg\u00e4u", "Gemeinde": "Sulzberg", "Gemeindeschluessel": "09780140", "Postleitzahl": "87477", "Strasse": "Au", "StrasseNichtGefunden": "0", "Hausnummer": "7", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Sulzberg", "Laengengrad": "10.322080", "Breitengrad": "47.685476", "Registrierungsdatum": "2019-12-16", "Inbetriebnahmedatum": "2018-07-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Hybridspeicher AU", "Weic_nv": "1", "Kraftwerksnummer": "BNA1939", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "16000.000", "Nettonennleistung": "16000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9904254000009", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "BestandteilGrenzkraftwerk": "0", "ZugeordnenteWirkleistungWechselrichter": "16000.000", "SpeMastrNummer": "SSE991759625937", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2377745", "owner": "Allg\u00e4uer \u00dcberlandwerk GmbH", "mwh": 8, "ext_id": "SEE900291433160", "mw": 16, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": ""}}, "mw": 16, "mwh_is_estimate": false, "mwh": 8, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Hybridspeicher AU", "name_short": "Hybridspeicher AU", "owner": "Allg\u00e4uer \u00dcberlandwerk GmbH", "state": "bavaria", "country": "germany", "lat": "47.685476", "long": "10.322080", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:47.685476+10.322080", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2377745"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Burton", "city": "", "id": "269", "external_id": "6920", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-09-30", "start_construction": "2018-01-25", "start_operation": "2018-06-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "269", "external_id": "6920", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Burton", "external_id": "6920", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "EDF Energy Renewables", "status": "operation", "date_first_heard": "2016-09-30", "start_construction": "2018-01-25", "start_operation": "2018-06-25", "start_estimated": "", "month_disappeared": "", "lat": "53.364529", "long": "-0.798356", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6920", "Record Last Updated (dd/mm/yyyy)": "27/11/2018", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "West Burton", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "West Burton Power Station North Road West Burton Retford Nottinghamshire ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 9BL", "X-coordinate": "480060", "Y-coordinate": "385968", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "16/00954/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "25/01/2018", "Operational": "25/06/2018", "Heat Network Ref": "", "lat": "53.364529", "long": "-0.798356", "status": "operation", "mw": 49, "ext_id": "6920"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/11/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/11/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6920", "Record Last Updated (dd/mm/yyyy)": "27/11/2018", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "West Burton", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Burton Power Station North Road West Burton Retford Nottinghamshire ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 9BL", "X-coordinate": "480060", "Y-coordinate": "385968", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "16/00954/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "25/01/2018", "Operational": "25/06/2018", "Heat Network Ref": "", "lat": "53.364529", "long": "-0.798356", "status": "operation", "mw": 49, "ext_id": "6920"}, "current_month": "2024-01", "dates": {"first_heard": "2018-11-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-09-30", "start_construction": "2018-01-25", "start_operation": "2018-06-25", "start_estimated": "", "month_disappeared": "", "go_live": "2018-06", "go_live_year_int": 2018, "name": "West Burton", "name_short": "West Burton", "owner": "EDF Energy Renewables", "state": "east midlands", "country": "uk", "lat": "53.364529", "long": "-0.798356", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.364529+-0.798356", "construction_time_month": 5, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pinal Central Solar Energy Center", "city": "", "id": "31", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Salt River Project", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.868983", "long": "-111.557171", "coords_hint": "1", "use_case": "20MW solar farm support", "notes": "Added 40 mwh as the youtube video said it can power with 10MW for 4 hours", "project_website": "", "link1": "https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "link2": "https://www.youtube.com/watch?v=e9RuVL3t4jQ", "link3": "", "link4": ""}, "internal_id": "31", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Pinal Central Solar Energy Center", "name_short": "Pinal Central Solar", "owner": "", "state": "arizona", "country": "usa", "lat": "32.868983", "long": "-111.557171", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.868983+-111.557171", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Added 40 mwh as the youtube video said it can power with 10MW for 4 hours"], "links": ["https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "https://www.youtube.com/watch?v=e9RuVL3t4jQ"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Terhills", "city": "Terhills", "id": "32", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "29", "estimate_mwh": "", "power_mw": "18", "customer": "Restore", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.006595", "long": "5.711134", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/", "link2": "", "link3": "", "link4": ""}, "internal_id": "32", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 18, "mwh_is_estimate": false, "mwh": 29, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Terhills", "name_short": "Terhills", "owner": "", "state": "", "country": "belgium", "lat": "51.006595", "long": "5.711134", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.006595+5.711134", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Tynemouth Energy Storage System (TESS)", "city": "", "id": "270", "external_id": "6925", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Enel (formerly Element Power)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-12", "start_construction": "2018-12-20", "start_operation": "2018-05-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "270", "external_id": "6925", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tynemouth Energy Storage System (TESS)", "external_id": "6925", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Enel (formerly Element Power)", "status": "operation", "date_first_heard": "2016-10-12", "start_construction": "2018-12-20", "start_operation": "2018-05-25", "start_estimated": "", "month_disappeared": "", "lat": "55.025976", "long": "-1.503105", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6925", "Record Last Updated (dd/mm/yyyy)": "03/08/2018", "Operator (or Applicant)": "Enel (formerly Element Power)", "Site Name": "Tynemouth Energy Storage System (TESS)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Newcastle", "County": "Tyne and Wear", "Region": "North East", "Country": "England", "Post Code": "NE27 0NB", "X-coordinate": "431864", "Y-coordinate": "570273", "Planning Authority": "North Tyneside Council", "Planning Application Reference": "16/01451/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/10/2019", "Under Construction": "20/12/2018", "Operational": "25/05/2018", "Heat Network Ref": "", "lat": "55.025976", "long": "-1.503105", "status": "operation", "mw": 25, "ext_id": "6925"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/08/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/08/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6925", "Record Last Updated (dd/mm/yyyy)": "03/08/2018", "Operator (or Applicant)": "Enel (formerly Element Power)", "Site Name": "Tynemouth Energy Storage System (TESS)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newcastle", "County": "Tyne and Wear", "Region": "North East", "Country": "England", "Post Code": "NE27 0NB", "X-coordinate": "431864", "Y-coordinate": "570273", "Planning Authority": "North Tyneside Council", "Planning Application Reference": "16/01451/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/10/2019", "Under Construction": "20/12/2018", "Operational": "25/05/2018", "Heat Network Ref": "", "lat": "55.025976", "long": "-1.503105", "status": "operation", "mw": 25, "ext_id": "6925"}, "current_month": "2024-01", "dates": {"first_heard": "2018-08-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-12", "start_construction": "2018-12-20", "start_operation": "2018-05-25", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Tynemouth Energy Storage System (TESS)", "name_short": "Tynemouth Energy Storage System (TE...", "owner": "Enel (formerly Element Power)", "state": "north east", "country": "uk", "lat": "55.025976", "long": "-1.503105", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.025976+-1.503105", "construction_time_month": -7, "construction_speed_mwh_per_month": -3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pen y Cymoedd Energy Storage", "city": "", "id": "272", "external_id": "6927", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Vattenfall", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-11-01", "start_operation": "2018-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "272", "external_id": "6927", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pen y Cymoedd Energy Storage", "external_id": "6927", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 22, "power_mw": 22, "owner": "Vattenfall", "status": "operation", "date_first_heard": "2011-11-18", "start_construction": "2017-11-01", "start_operation": "2018-05-01", "start_estimated": "", "month_disappeared": "", "lat": "51.655543", "long": "-3.69573", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6927", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Vattenfall", "Site Name": "Pen y Cymoedd Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4595", "Installed Capacity (MWelec)": "22.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Pen y Cymoedd, Neath Port Talbot ", "County": "Neath Port Talbot", "Region": "Wales", "Country": "Wales", "Post Code": "SA13 3HF", "X-coordinate": "282793", "Y-coordinate": "196557", "Planning Authority": "Neath Port Talbot County Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/11/2017", "Operational": "01/05/2018", "Heat Network Ref": "", "lat": "51.655543", "long": "-3.69573", "status": "operation", "mw": 22, "ext_id": "6927"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Planning Authority", "from": "Neath Port Talbot County Borough Council", "to": "Neath Port Talbot Council", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "", "to": "P2009/1053", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "", "to": "19/11/2009", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/11/2011", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6927", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Vattenfall", "Site Name": "Pen y Cymoedd Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4595", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Pen y Cymoedd, Neath Port Talbot ", "County": "Neath Port Talbot", "Region": "Wales", "Country": "Wales", "Post Code": "SA13 3HF", "X-coordinate": "282793", "Y-coordinate": "196557", "Planning Authority": "Neath Port Talbot Council", "Planning Application Reference": "P2009/1053", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2009", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2011", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/11/2017", "Operational": "01/05/2018", "Heat Network Ref": "", "lat": "51.655543", "long": "-3.69573", "status": "operation", "mw": 22, "ext_id": "6927"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 22, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2011-11-18", "start_construction": "2017-11-01", "start_operation": "2018-05-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Pen y Cymoedd Energy Storage", "name_short": "Pen y Cymoedd", "owner": "Vattenfall", "state": "wales", "country": "uk", "lat": "51.655543", "long": "-3.69573", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.655543+-3.69573", "construction_time_month": 6, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane", "city": "", "id": "673", "external_id": "7148", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Walker & Son (Hauliers) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-10-06", "start_construction": "2018-03-01", "start_operation": "2018-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "673", "external_id": "7148", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane", "external_id": "7148", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Walker & Son (Hauliers) Limited", "status": "operation", "date_first_heard": "2017-10-06", "start_construction": "2018-03-01", "start_operation": "2018-05-01", "start_estimated": "", "month_disappeared": "", "lat": "53.718198", "long": "-1.276097", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7148", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447870", "Y-coordinate": "424886", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "17/01857/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2018", "Operational": "01/05/2018", "Heat Network Ref": "", "": "", "lat": "53.718198", "long": "-1.276097", "status": "operation", "mw": 20, "ext_id": "7148"}, "first_month": "2022-04", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/01/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "19/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7148", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447870", "Y-coordinate": "424886", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "17/01857/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2018", "Operational": "01/05/2018", "Heat Network Ref": "", "lat": "53.718198", "long": "-1.276097", "status": "operation", "mw": 20, "ext_id": "7148"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-10-06", "start_construction": "2018-03-01", "start_operation": "2018-05-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Kirkhaw Lane", "name_short": "Kirkhaw Lane", "owner": "Walker & Son (Hauliers) Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.718198", "long": "-1.276097", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.718198+-1.276097", "construction_time_month": 2, "construction_speed_mwh_per_month": 10, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jardelund", "city": "Jardelund", "id": "90", "external_id": "SEE999790559914", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "51", "estimate_mwh": "", "power_mw": "48", "customer": "", "owner": "EnspireME (JV Eneco / Mitsubishi)", "developer": "", "manufacturer": "NEC Energy Solutions (LG)", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-10-01", "start_operation": "2018-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.851435", "long": "9.194775", "coords_hint": "1", "use_case": "frequency balancing", "notes": "according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021", "project_website": "https://www.neces.com/project/jardelund-germany-48-mw-51-mwh-2/", "link1": "https://www.youtube.com/watch?v=UheTmGO7BN0", "link2": "https://www.energy-storage.news/50mwh-battery-completed-in-germany-claims-europes-largest-crown/", "link3": "", "link4": ""}, "internal_id": "90", "external_id": "SEE999790559914", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "BESS Jardelund", "external_id": "SEE999790559914", "state": "schleswig-holstein", "country": "germany", "mwh": 48, "estimate_mwh": "", "power_mw": 48, "owner": "EnspireME", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-04-01", "start_estimated": "", "month_disappeared": "", "lat": "54.850889", "long": "9.194541", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3984077"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE999790559914", "DatumLetzteAktualisierung": "2021-01-18T13:43:38.4221011", "LokationMaStRNummer": "SEL926192843211", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-12", "AnlagenbetreiberMastrNummer": "ABR985310436612", "Land": "84", "Bundesland": "1411", "Landkreis": "Schleswig-Flensburg", "Gemeinde": "Jardelund", "Gemeindeschluessel": "01059129", "Postleitzahl": "24994", "Strasse": "Grenzstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "3 A", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Jardelund", "Laengengrad": "9.194541", "Breitengrad": "54.850889", "Registrierungsdatum": "2021-01-18", "Inbetriebnahmedatum": "2018-04-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BESS Jardelund", "Weic": "11W0-0000-0117-U", "Weic_nv": "0", "Kraftwerksnummer": "BNA1942", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "48000.000", "Nettonennleistung": "48000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9903067000008", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "52800.000", "SpeMastrNummer": "SSE963357090257", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 48, "pr_url_id": "3984077", "ext_id": "SEE999790559914", "mw": 48, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-12", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2021-02-12", "to": "2022-11-11", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE999790559914", "DatumLetzteAktualisierung": "2021-01-18T13:43:38.4221011", "LokationMaStRNummer": "SEL926192843211", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-11-11", "AnlagenbetreiberMastrNummer": "ABR985310436612", "Land": "84", "Bundesland": "1411", "Landkreis": "Schleswig-Flensburg", "Gemeinde": "Jardelund", "Gemeindeschluessel": "01059129", "Postleitzahl": "24994", "Strasse": "Grenzstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "3 A", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Jardelund", "Laengengrad": "9.194541", "Breitengrad": "54.850889", "Registrierungsdatum": "2021-01-18", "Inbetriebnahmedatum": "2018-04-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BESS Jardelund", "Weic": "11W0-0000-0117-U", "Weic_nv": "0", "Kraftwerksnummer": "BNA1942", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "48000.000", "Nettonennleistung": "48000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9903067000008", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "52800.000", "SpeMastrNummer": "SSE963357090257", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3984077", "owner": "EnspireME", "mwh": 48, "ext_id": "SEE999790559914", "mw": 48, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2018-04-01", "start_estimated": ""}}, "mw": 48, "mwh_is_estimate": false, "mwh": 48, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2017-10-01", "start_operation": "2018-04-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-04", "go_live_year_int": 2018, "name": "BESS Jardelund", "name_short": "BESS Jardelund", "owner": "EnspireME", "state": "schleswig-holstein", "country": "germany", "lat": "54.850889", "long": "9.194541", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.850889+9.194541", "construction_time_month": 6, "construction_speed_mwh_per_month": 8, "no_of_battery_units": 0, "notes_split": ["according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021"], "links": ["https://www.youtube.com/watch?v=UheTmGO7BN0", "https://www.energy-storage.news/50mwh-battery-completed-in-germany-claims-europes-largest-crown/", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3984077"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Nevendon", "city": "", "id": "271", "external_id": "6926", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Belectric UK / Foresight", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2018-10-15", "start_operation": "2018-03-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "271", "external_id": "6926", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Nevendon", "external_id": "6926", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Belectric UK / Foresight", "status": "operation", "date_first_heard": "2017-03-28", "start_construction": "2018-10-15", "start_operation": "2018-03-15", "start_estimated": "", "month_disappeared": "", "lat": "51.593336", "long": "0.494883", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6926", "Record Last Updated (dd/mm/yyyy)": "28/03/2017", "Operator (or Applicant)": "Belectric UK / Foresight", "Site Name": "Nevendon", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Nevendon, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS14 3JH", "X-coordinate": "572912", "Y-coordinate": "191225", "Planning Authority": "Essex County Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/10/2018", "Operational": "15/03/2018", "Heat Network Ref": "", "lat": "51.593336", "long": "0.494883", "status": "operation", "mw": 10, "ext_id": "6926"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Nevendon, Essex", "to": "Nevendon,", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/03/2017", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "28/03/2017", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6926", "Record Last Updated (dd/mm/yyyy)": "28/03/2017", "Operator (or Applicant)": "Belectric UK / Foresight", "Site Name": "Nevendon", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Nevendon,", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS14 3JH", "X-coordinate": "572912", "Y-coordinate": "191225", "Planning Authority": "Essex County Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/10/2018", "Operational": "15/03/2018", "Heat Network Ref": "", "lat": "51.593336", "long": "0.494883", "status": "operation", "mw": 10, "ext_id": "6926"}, "current_month": "2024-01", "dates": {"first_heard": "2017-03-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-03-28", "start_construction": "2018-10-15", "start_operation": "2018-03-15", "start_estimated": "", "month_disappeared": "", "go_live": "2018-03", "go_live_year_int": 2018, "name": "Nevendon", "name_short": "Nevendon", "owner": "Belectric UK / Foresight", "state": "eastern", "country": "uk", "lat": "51.593336", "long": "0.494883", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.593336+0.494883", "construction_time_month": -7, "construction_speed_mwh_per_month": -1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Claredown Farm", "city": "", "id": "274", "external_id": "6945", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Zenobe (formerly Energy Reservoir 15)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-06-05", "start_construction": "2017-09-01", "start_operation": "2018-02-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "274", "external_id": "6945", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Claredown Farm", "external_id": "6945", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Zenobe (formerly Energy Reservoir 15)", "status": "operation", "date_first_heard": "2017-06-05", "start_construction": "2017-09-01", "start_operation": "2018-02-27", "start_estimated": "", "month_disappeared": "", "lat": "52.070683", "long": "0.607816", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6945", "Record Last Updated (dd/mm/yyyy)": "26/11/2019", "Operator (or Applicant)": "Zenobe (formerly Energy Reservoir 15)", "Site Name": "Claredown Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land at Claredown Farm, Hickford Hill, Belchamp St Paul\n", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CO10 7DW", "X-coordinate": "578833", "Y-coordinate": "244577", "Planning Authority": "Braintree District Council", "Planning Application Reference": "17/00583/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2017", "Operational": "27/02/2018", "Heat Network Ref": "", "lat": "52.070683", "long": "0.607816", "status": "operation", "mw": 20, "ext_id": "6945"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/11/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "26/11/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6945", "Record Last Updated (dd/mm/yyyy)": "26/11/2019", "Operator (or Applicant)": "Zenobe (formerly Energy Reservoir 15)", "Site Name": "Claredown Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Claredown Farm, Hickford Hill, Belchamp St Paul\n", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CO10 7DW", "X-coordinate": "578833", "Y-coordinate": "244577", "Planning Authority": "Braintree District Council", "Planning Application Reference": "17/00583/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2017", "Operational": "27/02/2018", "Heat Network Ref": "", "lat": "52.070683", "long": "0.607816", "status": "operation", "mw": 20, "ext_id": "6945"}, "current_month": "2024-01", "dates": {"first_heard": "2019-11-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-06-05", "start_construction": "2017-09-01", "start_operation": "2018-02-27", "start_estimated": "", "month_disappeared": "", "go_live": "2018-02", "go_live_year_int": 2018, "name": "Claredown Farm", "name_short": "Claredown Farm", "owner": "Zenobe (formerly Energy Reservoir 15)", "state": "eastern", "country": "uk", "lat": "52.070683", "long": "0.607816", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.070683+0.607816", "construction_time_month": 5, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Huggin's Hall", "city": "", "id": "341", "external_id": "7129", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Low Carbon", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2017-08-13", "start_operation": "2018-02-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "341", "external_id": "7129", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Huggin's Hall", "external_id": "7129", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Low Carbon", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2017-08-13", "start_operation": "2018-02-13", "start_estimated": "", "month_disappeared": "", "lat": "51.093574", "long": "0.508258", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7129", "Record Last Updated (dd/mm/yyyy)": "23/10/2018", "Operator (or Applicant)": "Low Carbon", "Site Name": "Huggin's Hall", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land at Huggin's Hall, Glassenbury Road, Cranbrook, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "N17 2QE", "X-coordinate": "575739", "Y-coordinate": "135688", "Planning Authority": "Tunbridge Wells Borough Council", "Planning Application Reference": "16/06052/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "13/08/2017", "Operational": "13/02/2018", "Heat Network Ref": "", "lat": "51.093574", "long": "0.508258", "status": "operation", "mw": 40, "ext_id": "7129"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/10/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/10/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7129", "Record Last Updated (dd/mm/yyyy)": "23/10/2018", "Operator (or Applicant)": "Low Carbon", "Site Name": "Huggin's Hall", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Huggin's Hall, Glassenbury Road, Cranbrook, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "N17 2QE", "X-coordinate": "575739", "Y-coordinate": "135688", "Planning Authority": "Tunbridge Wells Borough Council", "Planning Application Reference": "16/06052/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "13/08/2017", "Operational": "13/02/2018", "Heat Network Ref": "", "lat": "51.093574", "long": "0.508258", "status": "operation", "mw": 40, "ext_id": "7129"}, "current_month": "2024-01", "dates": {"first_heard": "2018-10-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-21", "start_construction": "2017-08-13", "start_operation": "2018-02-13", "start_estimated": "", "month_disappeared": "", "go_live": "2018-02", "go_live_year_int": 2018, "name": "Huggin's Hall", "name_short": "Huggin's Hall", "owner": "Low Carbon", "state": "south east", "country": "uk", "lat": "51.093574", "long": "0.508258", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.093574+0.508258", "construction_time_month": 6, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Korea Zinc", "city": "ulsan", "id": "52", "external_id": "", "state": "", "country": "south korea", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "32", "customer": "Korea Zinc", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-07-27", "start_construction": "", "start_operation": "2018-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.430406", "long": "129.340086", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://pulsenews.co.kr/view.php?year=2017&no=505105", "link2": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "link3": "https://www.koreazinc.co.kr/english/company/page/headOffice.aspx", "link4": ""}, "internal_id": "52", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 32, "mwh_is_estimate": false, "mwh": 150, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-07-27", "start_construction": "", "start_operation": "2018-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-01", "go_live_year_int": 2018, "name": "Korea Zinc", "name_short": "Korea Zinc", "owner": "", "state": "", "country": "south korea", "lat": "35.430406", "long": "129.340086", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.430406+129.340086", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://pulsenews.co.kr/view.php?year=2017&no=505105", "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "https://www.koreazinc.co.kr/english/company/page/headOffice.aspx"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Leverton Farm - Energy Barn", "city": "", "id": "267", "external_id": "6917", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Eelpower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-11-01", "start_operation": "2018-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "267", "external_id": "6917", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Leverton Farm - Energy Barn", "external_id": "6917", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Eelpower", "status": "operation", "date_first_heard": "2018-12-11", "start_construction": "2017-11-01", "start_operation": "2018-01-01", "start_estimated": "", "month_disappeared": "", "lat": "53.259954", "long": "-0.56403", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6917", "Record Last Updated (dd/mm/yyyy)": "11/12/2018", "Operator (or Applicant)": "Eelpower", "Site Name": "Leverton Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Leverton Farm, Birch Holt Farm, Burton Lincoln, Lincoln\n", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "LN1 2RD", "X-coordinate": "495886", "Y-coordinate": "374623", "Planning Authority": "Lincolnshire County Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/11/2017", "Operational": "01/01/2018", "Heat Network Ref": "", "lat": "53.259954", "long": "-0.56403", "status": "operation", "mw": 10, "ext_id": "6917"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/12/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "11/12/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6917", "Record Last Updated (dd/mm/yyyy)": "11/12/2018", "Operator (or Applicant)": "Eelpower", "Site Name": "Leverton Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Leverton Farm, Birch Holt Farm, Burton Lincoln, Lincoln\n", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "LN1 2RD", "X-coordinate": "495886", "Y-coordinate": "374623", "Planning Authority": "Lincolnshire County Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/11/2017", "Operational": "01/01/2018", "Heat Network Ref": "", "lat": "53.259954", "long": "-0.56403", "status": "operation", "mw": 10, "ext_id": "6917"}, "current_month": "2024-01", "dates": {"first_heard": "2018-12-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-12-11", "start_construction": "2017-11-01", "start_operation": "2018-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-01", "go_live_year_int": 2018, "name": "Leverton Farm - Energy Barn", "name_short": "Leverton Farm - Energy Barn", "owner": "Eelpower", "state": "east midlands", "country": "uk", "lat": "53.259954", "long": "-0.56403", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.259954+-0.56403", "construction_time_month": 2, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cleator", "city": "", "id": "354", "external_id": "7177", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Low Carbon Storage Investment Company/ VLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-08-08", "start_operation": "2018-01-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "354", "external_id": "7177", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cleator", "external_id": "7177", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Low Carbon Storage Investment Company/ VLC", "status": "operation", "date_first_heard": "2019-01-03", "start_construction": "2017-08-08", "start_operation": "2018-01-08", "start_estimated": "", "month_disappeared": "", "lat": "54.503359", "long": "-3.529301", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7177", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Low Carbon Storage Investment Company/ VLC", "Site Name": "Cleator", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Cleator, Cumbria", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA22 2TA", "X-coordinate": "301067", "Y-coordinate": "513081", "Planning Authority": "Copeland Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "08/08/2017", "Operational": "08/01/2018", "Heat Network Ref": "", "lat": "54.503359", "long": "-3.529301", "status": "operation", "mw": 10, "ext_id": "7177"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7177", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Low Carbon Storage Investment Company/ VLC", "Site Name": "Cleator", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cleator, Cumbria", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA22 2TA", "X-coordinate": "301067", "Y-coordinate": "513081", "Planning Authority": "Copeland Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "08/08/2017", "Operational": "08/01/2018", "Heat Network Ref": "", "lat": "54.503359", "long": "-3.529301", "status": "operation", "mw": 10, "ext_id": "7177"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-01-03", "start_construction": "2017-08-08", "start_operation": "2018-01-08", "start_estimated": "", "month_disappeared": "", "go_live": "2018-01", "go_live_year_int": 2018, "name": "Cleator", "name_short": "Cleator", "owner": "Low Carbon Storage Investment Company/ VLC", "state": "north west", "country": "uk", "lat": "54.503359", "long": "-3.529301", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.503359+-3.529301", "construction_time_month": 5, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hornsdale Power Reserve", "city": "hornsdale", "id": "8", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "194", "estimate_mwh": "", "power_mw": "150", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.085797", "long": "138.518339", "coords_hint": "1", "use_case": "316MW wind farm support", "notes": "42 power packs", "project_website": "https://hornsdalepowerreserve.com.au/", "link1": "https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve", "link2": "", "link3": "", "link4": ""}, "internal_id": "8", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 194, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-12", "go_live_year_int": 2017, "name": "Hornsdale Power Reserve", "name_short": "Hornsdale Power Reserve", "owner": "", "state": "south australia", "country": "australia", "lat": "-33.085797", "long": "138.518339", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.085797+138.518339", "construction_time_month": 4, "construction_speed_mwh_per_month": 48, "no_of_battery_units": 0, "notes_split": ["42 power packs"], "links": ["https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Lockleaze Energy Storage", "city": "", "id": "280", "external_id": "6961", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Aura Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-05-05", "start_construction": "2017-06-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "280", "external_id": "6961", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lockleaze Energy Storage", "external_id": "6961", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Aura Power", "status": "operation", "date_first_heard": "2017-05-05", "start_construction": "2017-06-01", "start_operation": "2017-12-01", "start_estimated": "", "month_disappeared": "", "lat": "51.484913", "long": "-2.571646", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6961", "Record Last Updated (dd/mm/yyyy)": "31/01/2019", "Operator (or Applicant)": "Aura Power", "Site Name": "Lockleaze Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land at the SWEB Estate, Romney Avenue, Lockleaze, Bristol", "County": "Avon", "Region": "South West", "Country": "England", "Post Code": "BS7 9ST", "X-coordinate": "360403", "Y-coordinate": "176373", "Planning Authority": "Bristol City Council", "Planning Application Reference": "17/01147/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/05/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/06/2017", "Operational": "01/12/2017", "Heat Network Ref": "", "lat": "51.484913", "long": "-2.571646", "status": "operation", "mw": 15, "ext_id": "6961"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "31/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6961", "Record Last Updated (dd/mm/yyyy)": "31/01/2019", "Operator (or Applicant)": "Aura Power", "Site Name": "Lockleaze Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at the SWEB Estate, Romney Avenue, Lockleaze, Bristol", "County": "Avon", "Region": "South West", "Country": "England", "Post Code": "BS7 9ST", "X-coordinate": "360403", "Y-coordinate": "176373", "Planning Authority": "Bristol City Council", "Planning Application Reference": "17/01147/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/05/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/06/2017", "Operational": "01/12/2017", "Heat Network Ref": "", "lat": "51.484913", "long": "-2.571646", "status": "operation", "mw": 15, "ext_id": "6961"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-05-05", "start_construction": "2017-06-01", "start_operation": "2017-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-12", "go_live_year_int": 2017, "name": "Lockleaze Energy Storage", "name_short": "Lockleaze", "owner": "Aura Power", "state": "south west", "country": "uk", "lat": "51.484913", "long": "-2.571646", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.484913+-2.571646", "construction_time_month": 6, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackburn Meadows ", "city": "", "id": "261", "external_id": "6906", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "E.ON UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-04-07", "start_operation": "2017-10-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "261", "external_id": "6906", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackburn Meadows ", "external_id": "6906", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "E.ON UK", "status": "operation", "date_first_heard": "2019-03-21", "start_construction": "2017-04-07", "start_operation": "2017-10-09", "start_estimated": "", "month_disappeared": "", "lat": "53.420135", "long": "-1.39846", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6906", "Record Last Updated (dd/mm/yyyy)": "21/03/2019", "Operator (or Applicant)": "E.ON UK", "Site Name": "Blackburn Meadows ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "166", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Blackburn Meadows in Sheffield, South Yorkshire", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S9 1HF", "X-coordinate": "440075", "Y-coordinate": "391650", "Planning Authority": "Sheffield City Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "07/04/2017", "Operational": "09/10/2017", "Heat Network Ref": "", "lat": "53.420135", "long": "-1.39846", "status": "operation", "mw": 10, "ext_id": "6906"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/03/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "21/03/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6906", "Record Last Updated (dd/mm/yyyy)": "21/03/2019", "Operator (or Applicant)": "E.ON UK", "Site Name": "Blackburn Meadows ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "166", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackburn Meadows in Sheffield, South Yorkshire", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S9 1HF", "X-coordinate": "440075", "Y-coordinate": "391650", "Planning Authority": "Sheffield City Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "07/04/2017", "Operational": "09/10/2017", "Heat Network Ref": "", "lat": "53.420135", "long": "-1.39846", "status": "operation", "mw": 10, "ext_id": "6906"}, "current_month": "2024-01", "dates": {"first_heard": "2019-03-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-03-21", "start_construction": "2017-04-07", "start_operation": "2017-10-09", "start_estimated": "", "month_disappeared": "", "go_live": "2017-10", "go_live_year_int": 2017, "name": "Blackburn Meadows ", "name_short": "Blackburn Meadows ", "owner": "E.ON UK", "state": "yorkshire and humber", "country": "uk", "lat": "53.420135", "long": "-1.39846", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.420135+-1.39846", "construction_time_month": 6, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Q_ESS_Elverlingsen", "city": "", "id": "541", "external_id": "SEE966091400436", "state": "nrw", "country": "germany", "capacity_mwh": "18", "estimate_mwh": "", "power_mw": "17", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "541", "external_id": "SEE966091400436", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Q_ESS_Elverlingsen", "external_id": "SEE966091400436", "state": "nrw", "country": "germany", "mwh": 18, "estimate_mwh": "", "power_mw": 17, "owner": "Coulomb GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": "", "month_disappeared": "", "lat": "51.274860", "long": "7.704284", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2607339"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE966091400436", "DatumLetzteAktualisierung": "2021-02-15T12:47:02.2298795", "LokationMaStRNummer": "SEL990520260384", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2021-05-26", "AnlagenbetreiberMastrNummer": "ABR922907721966", "Land": "84", "Bundesland": "1409", "Landkreis": "M\u00e4rkischer Kreis", "Gemeinde": "Werdohl", "Gemeindeschluessel": "05962060", "Postleitzahl": "58791", "Strasse": "Auf der Mark", "StrasseNichtGefunden": "1", "Hausnummer": "1", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Werdohl", "Laengengrad": "7.704284", "Breitengrad": "51.274860", "Registrierungsdatum": "2019-12-17", "Inbetriebnahmedatum": "2017-07-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Q_ESS_Elverlingsen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "17080.000", "Nettonennleistung": "17080.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9903097000002", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "17080.000", "SpeMastrNummer": "SSE987360535918", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 18, "pr_url_id": "2607339", "ext_id": "SEE966091400436", "mw": 17, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-08", "li": [{"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-05-26", "to": "2022-06-01", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE966091400436", "DatumLetzteAktualisierung": "2021-02-15T12:47:02.2298795", "LokationMaStRNummer": "SEL990520260384", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-06-01", "AnlagenbetreiberMastrNummer": "ABR922907721966", "Land": "84", "Bundesland": "1409", "Landkreis": "M\u00e4rkischer Kreis", "Gemeinde": "Werdohl", "Gemeindeschluessel": "05962060", "Postleitzahl": "58791", "Strasse": "Auf der Mark", "StrasseNichtGefunden": "1", "Hausnummer": "1", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Werdohl", "Laengengrad": "7.704284", "Breitengrad": "51.274860", "Registrierungsdatum": "2019-12-17", "Inbetriebnahmedatum": "2017-07-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Q_ESS_Elverlingsen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "17080.000", "Nettonennleistung": "17080.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9903097000002", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "17080.000", "SpeMastrNummer": "SSE987360535918", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2607339", "owner": "Coulomb GmbH", "mwh": 18, "ext_id": "SEE966091400436", "mw": 17, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": ""}}, "mw": 17, "mwh_is_estimate": false, "mwh": 18, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-07", "go_live_year_int": 2017, "name": "Q_ESS_Elverlingsen", "name_short": "Q_ESS_Elverlingsen", "owner": "Coulomb GmbH", "state": "nrw", "country": "germany", "lat": "51.274860", "long": "7.704284", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.274860+7.704284", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2607339"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mira Loma Substation", "city": "Ontario", "id": "20", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "SCE Southern California Edison", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.00548", "long": "-117.566749", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity", "link2": "", "link3": "", "link4": ""}, "internal_id": "20", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "month_disappeared": "", "go_live": "2017-06", "go_live_year_int": 2017, "name": "Mira Loma Substation", "name_short": "Mira Loma Substation", "owner": "", "state": "california", "country": "usa", "lat": "34.00548", "long": "-117.566749", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.00548+-117.566749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hanover / Herrenhausen", "city": "Hanover", "id": "87", "external_id": "SEE953605889740", "state": "lower saxony", "country": "germany", "capacity_mwh": "17", "estimate_mwh": "", "power_mw": "", "customer": "enercity", "owner": "Mercedes Benz Energy", "developer": "", "manufacturer": "", "type": "ev battery", "cells": "", "no_of_battery_units": "3240", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.398301", "long": "9.681795", "coords_hint": "1", "use_case": "frequency balancing", "notes": "first and second life EV battery storage with smart car batteries", "project_website": "", "link1": "https://www.daimler.com/sustainability/resources/battery-storage-daimler-and-enercity.html", "link2": "https://www.electrive.net/2017/10/23/daimler-batterie-ersatzteillager-fuer-elektroautos-am-netz/", "link3": "https://www.youtube.com/watch?v=dDKVnp7_jrs", "link4": ""}, "internal_id": "87", "external_id": "SEE953605889740", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicher Herrenhausen", "external_id": "SEE953605889740", "state": "lower saxony", "country": "germany", "mwh": 17, "estimate_mwh": "", "power_mw": 14, "owner": "enercity AG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-28", "start_estimated": "", "month_disappeared": "", "lat": "52.398519", "long": "9.681854", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2568940"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE953605889740", "DatumLetzteAktualisierung": "2020-08-31T11:01:31.0300398", "LokationMaStRNummer": "SEL980392669743", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-01-22", "AnlagenbetreiberMastrNummer": "ABR901203303755", "Land": "84", "Bundesland": "1408", "Landkreis": "Region Hannover", "Gemeinde": "Hannover", "Gemeindeschluessel": "03241001", "Postleitzahl": "30419", "Strasse": "Leinh\u00e4user Weg", "StrasseNichtGefunden": "0", "Hausnummer": "5", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Hannover", "Laengengrad": "9.681854", "Breitengrad": "52.398519", "Registrierungsdatum": "2019-12-06", "Inbetriebnahmedatum": "2017-06-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Herrenhausen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "14000.000", "Nettonennleistung": "14000.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20412.000", "SpeMastrNummer": "SSE902773077886", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 17, "pr_url_id": "2568940", "ext_id": "SEE953605889740", "mw": 14, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE953605889740", "DatumLetzteAktualisierung": "2020-08-31T11:01:31.0300398", "LokationMaStRNummer": "SEL980392669743", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-01-22", "AnlagenbetreiberMastrNummer": "ABR901203303755", "Land": "84", "Bundesland": "1408", "Landkreis": "Region Hannover", "Gemeinde": "Hannover", "Gemeindeschluessel": "03241001", "Postleitzahl": "30419", "Strasse": "Leinh\u00e4user Weg", "StrasseNichtGefunden": "0", "Hausnummer": "5", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Hannover", "Laengengrad": "9.681854", "Breitengrad": "52.398519", "Registrierungsdatum": "2019-12-06", "Inbetriebnahmedatum": "2017-06-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Herrenhausen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "14000.000", "Nettonennleistung": "14000.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20412.000", "SpeMastrNummer": "SSE902773077886", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2568940", "owner": "enercity AG", "mwh": 17, "ext_id": "SEE953605889740", "mw": 14, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2017-06-28", "start_estimated": ""}}, "mw": 14, "mwh_is_estimate": false, "mwh": 17, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-28", "start_estimated": "", "month_disappeared": "", "go_live": "2017-06", "go_live_year_int": 2017, "name": "Batteriespeicher Herrenhausen", "name_short": "Batteriespeicher Herrenhausen", "owner": "enercity AG", "state": "lower saxony", "country": "germany", "lat": "52.398519", "long": "9.681854", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.398519+9.681854", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 3240, "notes_split": ["first and second life EV battery storage with smart car batteries"], "links": ["https://www.daimler.com/sustainability/resources/battery-storage-daimler-and-enercity.html", "https://www.electrive.net/2017/10/23/daimler-batterie-ersatzteillager-fuer-elektroautos-am-netz/", "https://www.youtube.com/watch?v=dDKVnp7_jrs", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2568940"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pelham", "city": "", "id": "260", "external_id": "6898", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy/ InfraRed Capital", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-18", "start_construction": "2017-01-15", "start_operation": "2017-06-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "260", "external_id": "6898", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pelham", "external_id": "6898", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy/ InfraRed Capital", "status": "operation", "date_first_heard": "2016-10-18", "start_construction": "2017-01-15", "start_operation": "2017-06-15", "start_estimated": "", "month_disappeared": "", "lat": "51.937437", "long": "0.119184", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6898", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Statera Energy/ InfraRed Capital", "Site Name": "Pelham", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "LAND NORTH OF PELHAM SUBSATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP\ufffdS STORTFORD, ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM23 1BA", "X-coordinate": "545779", "Y-coordinate": "228669", "Planning Authority": "Uttlesford District Council", "Planning Application Reference": "UTT/16/2316/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/10/2019", "Under Construction": "15/01/2017", "Operational": "15/06/2017", "Heat Network Ref": "", "lat": "51.937437", "long": "0.119184", "status": "operation", "mw": 49, "ext_id": "6898"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6898", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Statera Energy/ InfraRed Capital", "Site Name": "Pelham", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "LAND NORTH OF PELHAM SUBSATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP\ufffdS STORTFORD, ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM23 1BA", "X-coordinate": "545779", "Y-coordinate": "228669", "Planning Authority": "Uttlesford District Council", "Planning Application Reference": "UTT/16/2316/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/10/2019", "Under Construction": "15/01/2017", "Operational": "15/06/2017", "Heat Network Ref": "", "lat": "51.937437", "long": "0.119184", "status": "operation", "mw": 49, "ext_id": "6898"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-18", "start_construction": "2017-01-15", "start_operation": "2017-06-15", "start_estimated": "", "month_disappeared": "", "go_live": "2017-06", "go_live_year_int": 2017, "name": "Pelham", "name_short": "Pelham", "owner": "Statera Energy/ InfraRed Capital", "state": "eastern", "country": "uk", "lat": "51.937437", "long": "0.119184", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.937437+0.119184", "construction_time_month": 5, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "city": "", "id": "528", "external_id": "SEE910324388312", "state": "saxony", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "528", "external_id": "SEE910324388312", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "external_id": "SEE910324388312", "state": "saxony", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": "", "month_disappeared": "", "lat": "50.856837", "long": "12.917631", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4139056"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE910324388312", "DatumLetzteAktualisierung": "2021-01-20T06:33:13.7986188", "LokationMaStRNummer": "SEL973164328665", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-08-19", "AnlagenbetreiberMastrNummer": "ABR992411297332", "Land": "84", "Bundesland": "1413", "Landkreis": "Chemnitz", "Gemeinde": "Chemnitz", "Gemeindeschluessel": "14511000", "Postleitzahl": "09114", "Strasse": "Dammweg", "StrasseNichtGefunden": "0", "Hausnummer": "15", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Chemnitz", "Laengengrad": "12.917631", "Breitengrad": "50.856837", "Registrierungsdatum": "2021-01-20", "Inbetriebnahmedatum": "2017-04-24", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15800.000", "Nettonennleistung": "15800.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9905290000003", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16400.000", "SpeMastrNummer": "SSE985950438502", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "4139056", "ext_id": "SEE910324388312", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE910324388312", "DatumLetzteAktualisierung": "2021-01-20T06:33:13.7986188", "LokationMaStRNummer": "SEL973164328665", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-08-19", "AnlagenbetreiberMastrNummer": "ABR992411297332", "Land": "84", "Bundesland": "1413", "Landkreis": "Chemnitz", "Gemeinde": "Chemnitz", "Gemeindeschluessel": "14511000", "Postleitzahl": "09114", "Strasse": "Dammweg", "StrasseNichtGefunden": "0", "Hausnummer": "15", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Chemnitz", "Laengengrad": "12.917631", "Breitengrad": "50.856837", "Registrierungsdatum": "2021-01-20", "Inbetriebnahmedatum": "2017-04-24", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15800.000", "Nettonennleistung": "15800.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9905290000003", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16400.000", "SpeMastrNummer": "SSE985950438502", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4139056", "owner": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "mwh": 15, "ext_id": "SEE910324388312", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": "", "month_disappeared": "", "go_live": "2017-04", "go_live_year_int": 2017, "name": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "name_short": "Batteriespeicher Chemnitz GmbH \uff06 Co...", "owner": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "state": "saxony", "country": "germany", "lat": "50.856837", "long": "12.917631", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.856837+12.917631", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4139056"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kauai Island", "city": "Kauai", "id": "19", "external_id": "", "state": "hawaii", "country": "usa", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "", "customer": "KIUC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.998353", "long": "-159.378905", "coords_hint": "1", "use_case": "island, 13mw solar farm support", "notes": "20 year contract to buy energy", "project_website": "", "link1": "https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "link2": "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "link3": "https://en.wikipedia.org/wiki/Kauai", "link4": ""}, "internal_id": "19", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Kauai Island", "name_short": "Kauai Island", "owner": "", "state": "hawaii", "country": "usa", "lat": "21.998353", "long": "-159.378905", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:21.998353+-159.378905", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": ["20 year contract to buy energy"], "links": ["https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "https://en.wikipedia.org/wiki/Kauai"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hill Farm - Energy Barn", "city": "", "id": "265", "external_id": "6915", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-08-17", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "265", "external_id": "6915", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hill Farm - Energy Barn", "external_id": "6915", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Anesco/ Green Hedge Energy UK", "status": "operation", "date_first_heard": "2016-08-17", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "month_disappeared": "", "lat": "52.727871", "long": "-1.458906", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6915", "Record Last Updated (dd/mm/yyyy)": "15/03/2019", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Hill Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Hill Farm, Spring Lane, Packington, Ashby de la Zouch, Leicestershire\n", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE65 1WU", "X-coordinate": "436639", "Y-coordinate": "314607", "Planning Authority": "North West Leicestershire District Council", "Planning Application Reference": "16/00735/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/08/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "31/03/2017", "Heat Network Ref": "", "lat": "52.727871", "long": "-1.458906", "status": "operation", "mw": 10, "ext_id": "6915"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/03/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "15/03/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6915", "Record Last Updated (dd/mm/yyyy)": "15/03/2019", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Hill Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hill Farm, Spring Lane, Packington, Ashby de la Zouch, Leicestershire\n", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE65 1WU", "X-coordinate": "436639", "Y-coordinate": "314607", "Planning Authority": "North West Leicestershire District Council", "Planning Application Reference": "16/00735/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/08/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "31/03/2017", "Heat Network Ref": "", "lat": "52.727871", "long": "-1.458906", "status": "operation", "mw": 10, "ext_id": "6915"}, "current_month": "2024-01", "dates": {"first_heard": "2019-03-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-08-17", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Hill Farm - Energy Barn", "name_short": "Hill Farm - Energy Barn", "owner": "Anesco/ Green Hedge Energy UK", "state": "east midlands", "country": "uk", "lat": "52.727871", "long": "-1.458906", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.727871+-1.458906", "construction_time_month": 3, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kings Barn Farm - Energy Barn", "city": "", "id": "266", "external_id": "6916", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-04", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "266", "external_id": "6916", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kings Barn Farm - Energy Barn", "external_id": "6916", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Anesco/ Green Hedge Energy UK", "status": "operation", "date_first_heard": "2016-10-04", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "month_disappeared": "", "lat": "50.889769", "long": "-0.317163", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6916", "Record Last Updated (dd/mm/yyyy)": "15/03/2019", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Kings Barn Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Kings Barn Farm, Steyning, West Sussex", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "BN44 3YR", "X-coordinate": "518460", "Y-coordinate": "111380", "Planning Authority": "Horsham District Council", "Planning Application Reference": "DC/16/1648", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "31/03/2017", "Heat Network Ref": "", "lat": "50.889769", "long": "-0.317163", "status": "operation", "mw": 10, "ext_id": "6916"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/03/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "15/03/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6916", "Record Last Updated (dd/mm/yyyy)": "15/03/2019", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Kings Barn Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kings Barn Farm, Steyning, West Sussex", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "BN44 3YR", "X-coordinate": "518460", "Y-coordinate": "111380", "Planning Authority": "Horsham District Council", "Planning Application Reference": "DC/16/1648", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "31/03/2017", "Heat Network Ref": "", "lat": "50.889769", "long": "-0.317163", "status": "operation", "mw": 10, "ext_id": "6916"}, "current_month": "2024-01", "dates": {"first_heard": "2019-03-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-04", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Kings Barn Farm - Energy Barn", "name_short": "Kings Barn Farm - Energy Barn", "owner": "Anesco/ Green Hedge Energy UK", "state": "south east", "country": "uk", "lat": "50.889769", "long": "-0.317163", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.889769+-0.317163", "construction_time_month": 3, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Noriker Power Staunch", "city": "", "id": "268", "external_id": "6918", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Hazel Capital/ Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-05-19", "start_construction": "2016-12-15", "start_operation": "2017-03-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "268", "external_id": "6918", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Noriker Power Staunch", "external_id": "6918", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Hazel Capital/ Noriker Power", "status": "operation", "date_first_heard": "2016-05-19", "start_construction": "2016-12-15", "start_operation": "2017-03-15", "start_estimated": "", "month_disappeared": "", "lat": "53.032893", "long": "-2.243304", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6918", "Record Last Updated (dd/mm/yyyy)": "09/05/2019", "Operator (or Applicant)": "Hazel Capital/ Noriker Power", "Site Name": "Noriker Power Staunch", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Holditch House, Holditch Road, Chesterton", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST5 9JQ", "X-coordinate": "383781", "Y-coordinate": "348429", "Planning Authority": "Newcastle Under Lyme Borough Council", "Planning Application Reference": "16/00242/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/05/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "15/03/2017", "Heat Network Ref": "", "lat": "53.032893", "long": "-2.243304", "status": "operation", "mw": 20, "ext_id": "6918"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/05/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/05/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6918", "Record Last Updated (dd/mm/yyyy)": "09/05/2019", "Operator (or Applicant)": "Hazel Capital/ Noriker Power", "Site Name": "Noriker Power Staunch", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holditch House, Holditch Road, Chesterton", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST5 9JQ", "X-coordinate": "383781", "Y-coordinate": "348429", "Planning Authority": "Newcastle Under Lyme Borough Council", "Planning Application Reference": "16/00242/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/05/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "15/03/2017", "Heat Network Ref": "", "lat": "53.032893", "long": "-2.243304", "status": "operation", "mw": 20, "ext_id": "6918"}, "current_month": "2024-01", "dates": {"first_heard": "2019-05-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-05-19", "start_construction": "2016-12-15", "start_operation": "2017-03-15", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Noriker Power Staunch", "name_short": "Noriker Power Staunch", "owner": "Hazel Capital/ Noriker Power", "state": "west midlands", "country": "uk", "lat": "53.032893", "long": "-2.243304", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.032893+-2.243304", "construction_time_month": 3, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trents Energy Storage", "city": "St. Lucy", "id": "36", "external_id": "", "state": "", "country": "barbados", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "5", "customer": "Barbados Light & Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "13.293125", "long": "-59.627449", "coords_hint": "1", "use_case": "island, solar farm support", "notes": "", "project_website": "", "link1": "https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "link2": "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/", "link3": "", "link4": ""}, "internal_id": "36", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 5, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-01", "go_live_year_int": 2017, "name": "Trents Energy Storage", "name_short": "Trents", "owner": "", "state": "", "country": "barbados", "lat": "13.293125", "long": "-59.627449", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:13.293125+-59.627449", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Luenen", "city": "Luenen", "id": "86", "external_id": "SEE905490507995", "state": "nrw", "country": "germany", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Mercedes Benz Energy / The Mobility House", "developer": "", "manufacturer": "", "type": "ev battery", "cells": "", "no_of_battery_units": "1000", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.619937", "long": "7.471047", "coords_hint": "1", "use_case": "frequency balancing", "notes": "second life EV battery storage with smart fortwo batteries", "project_website": "", "link1": "https://www.mobilityhouse.com/int_en/magazine/press-releases/worlds-largest-2nd-use-battery-storage-is-starting-up.html/", "link2": "https://www.youtube.com/watch?v=dDKVnp7_jrs", "link3": "", "link4": ""}, "internal_id": "86", "external_id": "SEE905490507995", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Q_ESS_Luenen", "external_id": "SEE905490507995", "state": "nrw", "country": "germany", "mwh": 9, "estimate_mwh": "", "power_mw": 11, "owner": "Coulomb GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-12-01", "start_estimated": "", "month_disappeared": "", "lat": "51.616620", "long": "7.466350", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2607685"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE905490507995", "DatumLetzteAktualisierung": "2020-10-06T08:41:27.5953111", "LokationMaStRNummer": "SEL947145760096", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-06", "AnlagenbetreiberMastrNummer": "ABR922907721966", "Land": "84", "Bundesland": "1409", "Landkreis": "Unna", "Gemeinde": "L\u00fcnen", "Gemeindeschluessel": "05978024", "Postleitzahl": "44536", "Strasse": "Brunnenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "138", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "L\u00fcnen", "Laengengrad": "7.466350", "Breitengrad": "51.616620", "Registrierungsdatum": "2019-12-17", "Inbetriebnahmedatum": "2016-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Q_ESS_Luenen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "11920.000", "Nettonennleistung": "11920.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9903097000002", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11920.000", "SpeMastrNummer": "SSE912044016452", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 9, "pr_url_id": "2607685", "ext_id": "SEE905490507995", "mw": 11, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE905490507995", "DatumLetzteAktualisierung": "2020-10-06T08:41:27.5953111", "LokationMaStRNummer": "SEL947145760096", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-06", "AnlagenbetreiberMastrNummer": "ABR922907721966", "Land": "84", "Bundesland": "1409", "Landkreis": "Unna", "Gemeinde": "L\u00fcnen", "Gemeindeschluessel": "05978024", "Postleitzahl": "44536", "Strasse": "Brunnenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "138", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "L\u00fcnen", "Laengengrad": "7.466350", "Breitengrad": "51.616620", "Registrierungsdatum": "2019-12-17", "Inbetriebnahmedatum": "2016-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Q_ESS_Luenen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "11920.000", "Nettonennleistung": "11920.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9903097000002", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11920.000", "SpeMastrNummer": "SSE912044016452", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2607685", "owner": "Coulomb GmbH", "mwh": 9, "ext_id": "SEE905490507995", "mw": 11, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-12-01", "start_estimated": ""}}, "mw": 11, "mwh_is_estimate": false, "mwh": 9, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2016-12", "go_live_year_int": 2016, "name": "Q_ESS_Luenen", "name_short": "Q_ESS_Luenen", "owner": "Coulomb GmbH", "state": "nrw", "country": "germany", "lat": "51.616620", "long": "7.466350", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.616620+7.466350", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 1000, "notes_split": ["second life EV battery storage with smart fortwo batteries"], "links": ["https://www.mobilityhouse.com/int_en/magazine/press-releases/worlds-largest-2nd-use-battery-storage-is-starting-up.html/", "https://www.youtube.com/watch?v=dDKVnp7_jrs", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2607685"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ta'u island", "city": "Ta'u island", "id": "29", "external_id": "", "state": "american samoa", "country": "usa", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-14.219534", "long": "-169.494626", "coords_hint": "1", "use_case": "island, 1.4MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/", "link2": "", "link3": "", "link4": ""}, "internal_id": "29", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 6, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "month_disappeared": "", "go_live": "2016-11", "go_live_year_int": 2016, "name": "Ta'u island", "name_short": "Ta'u island", "owner": "", "state": "american samoa", "country": "usa", "lat": "-14.219534", "long": "-169.494626", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-14.219534+-169.494626", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "GBS KW Fenne", "city": "", "id": "530", "external_id": "SEE919443669678", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "530", "external_id": "SEE919443669678", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Fenne", "external_id": "SEE919443669678", "state": "saarland", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": "", "month_disappeared": "", "lat": "49.247195", "long": "6.878758", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3429839"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE919443669678", "DatumLetzteAktualisierung": "2020-09-16T11:13:40.5301939", "LokationMaStRNummer": "SEL949403128662", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-11-03", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Regionalverband Saarbr\u00fccken", "Gemeinde": "V\u00f6lklingen", "Gemeindeschluessel": "10041519", "Postleitzahl": "66333", "Strasse": "Saarbr\u00fccker Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "135", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "V\u00f6lklingen", "Laengengrad": "6.878758", "Breitengrad": "49.247195", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-10-09", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Fenne", "Weic_nv": "1", "Kraftwerksnummer": "BNA1814", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE987642146320", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE944760568557", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3429839", "ext_id": "SEE919443669678", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE919443669678", "DatumLetzteAktualisierung": "2020-09-16T11:13:40.5301939", "LokationMaStRNummer": "SEL949403128662", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-11-03", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Regionalverband Saarbr\u00fccken", "Gemeinde": "V\u00f6lklingen", "Gemeindeschluessel": "10041519", "Postleitzahl": "66333", "Strasse": "Saarbr\u00fccker Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "135", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "V\u00f6lklingen", "Laengengrad": "6.878758", "Breitengrad": "49.247195", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-10-09", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Fenne", "Weic_nv": "1", "Kraftwerksnummer": "BNA1814", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE987642146320", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE944760568557", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3429839", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE919443669678", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": "", "month_disappeared": "", "go_live": "2016-10", "go_live_year_int": 2016, "name": "GBS KW Fenne", "name_short": "GBS KW Fenne", "owner": "STEAG Battery System", "state": "saarland", "country": "germany", "lat": "49.247195", "long": "6.878758", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.247195+6.878758", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3429839"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS KW Walsum", "city": "", "id": "540", "external_id": "SEE964940893804", "state": "nrw", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "540", "external_id": "SEE964940893804", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Walsum", "external_id": "SEE964940893804", "state": "nrw", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": "", "month_disappeared": "", "lat": "51.527123", "long": "6.711709", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430514"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE964940893804", "DatumLetzteAktualisierung": "2020-09-16T10:52:57.7837543", "LokationMaStRNummer": "SEL914074075270", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-09", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1409", "Landkreis": "Duisburg", "Gemeinde": "Duisburg", "Gemeindeschluessel": "05112000", "Postleitzahl": "47179", "Strasse": "Dr.-Wilhelm-Roelen-Str.", "StrasseNichtGefunden": "0", "Hausnummer": "129", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Duisburg", "Laengengrad": "6.711709", "Breitengrad": "51.527123", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-09-30", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Walsum", "Weic_nv": "1", "Kraftwerksnummer": "BNA1815", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE967676113161", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE958726175123", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3430514", "ext_id": "SEE964940893804", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE964940893804", "DatumLetzteAktualisierung": "2020-09-16T10:52:57.7837543", "LokationMaStRNummer": "SEL914074075270", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-09", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1409", "Landkreis": "Duisburg", "Gemeinde": "Duisburg", "Gemeindeschluessel": "05112000", "Postleitzahl": "47179", "Strasse": "Dr.-Wilhelm-Roelen-Str.", "StrasseNichtGefunden": "0", "Hausnummer": "129", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Duisburg", "Laengengrad": "6.711709", "Breitengrad": "51.527123", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-09-30", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Walsum", "Weic_nv": "1", "Kraftwerksnummer": "BNA1815", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE967676113161", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE958726175123", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3430514", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE964940893804", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": "", "month_disappeared": "", "go_live": "2016-09", "go_live_year_int": 2016, "name": "GBS KW Walsum", "name_short": "GBS KW Walsum", "owner": "STEAG Battery System", "state": "nrw", "country": "germany", "lat": "51.527123", "long": "6.711709", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.527123+6.711709", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430514"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS KW Bexbach", "city": "", "id": "547", "external_id": "SEE990521990150", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "547", "external_id": "SEE990521990150", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Bexbach", "external_id": "SEE990521990150", "state": "saarland", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": "", "month_disappeared": "", "lat": "49.363960", "long": "7.239233", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430313"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE990521990150", "DatumLetzteAktualisierung": "2020-09-16T11:17:21.3046929", "LokationMaStRNummer": "SEL991630637981", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-08", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Saarpfalz-Kreis", "Gemeinde": "Bexbach", "Gemeindeschluessel": "10045111", "Postleitzahl": "66450", "Strasse": "Grubenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Bexbach", "Laengengrad": "7.239233", "Breitengrad": "49.363960", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-09-25", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Bexbach", "Weic_nv": "1", "Kraftwerksnummer": "BNA1816", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE950751939329", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE932353107191", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3430313", "ext_id": "SEE990521990150", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE990521990150", "DatumLetzteAktualisierung": "2020-09-16T11:17:21.3046929", "LokationMaStRNummer": "SEL991630637981", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-08", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Saarpfalz-Kreis", "Gemeinde": "Bexbach", "Gemeindeschluessel": "10045111", "Postleitzahl": "66450", "Strasse": "Grubenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Bexbach", "Laengengrad": "7.239233", "Breitengrad": "49.363960", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-09-25", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Bexbach", "Weic_nv": "1", "Kraftwerksnummer": "BNA1816", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE950751939329", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE932353107191", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3430313", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE990521990150", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": "", "month_disappeared": "", "go_live": "2016-09", "go_live_year_int": 2016, "name": "GBS KW Bexbach", "name_short": "GBS KW Bexbach", "owner": "STEAG Battery System", "state": "saarland", "country": "germany", "lat": "49.363960", "long": "7.239233", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.363960+7.239233", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430313"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS 2 KW Bexbach", "city": "", "id": "527", "external_id": "SEE908096553144", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "527", "external_id": "SEE908096553144", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS 2 KW Bexbach", "external_id": "SEE908096553144", "state": "saarland", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": "", "month_disappeared": "", "lat": "49.363746", "long": "7.239967", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430593"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE908096553144", "DatumLetzteAktualisierung": "2021-01-29T06:06:12.4560336", "LokationMaStRNummer": "SEL933883666554", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-02", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Saarpfalz-Kreis", "Gemeinde": "Bexbach", "Gemeindeschluessel": "10045111", "Postleitzahl": "66450", "Strasse": "Grubenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Bexbach", "Laengengrad": "7.239967", "Breitengrad": "49.363746", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS 2 KW Bexbach", "Weic_nv": "0", "Kraftwerksnummer": "BNA1811", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE931076336376", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE915355479251", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3430593", "ext_id": "SEE908096553144", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE908096553144", "DatumLetzteAktualisierung": "2021-01-29T06:06:12.4560336", "LokationMaStRNummer": "SEL933883666554", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-02", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Saarpfalz-Kreis", "Gemeinde": "Bexbach", "Gemeindeschluessel": "10045111", "Postleitzahl": "66450", "Strasse": "Grubenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Bexbach", "Laengengrad": "7.239967", "Breitengrad": "49.363746", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS 2 KW Bexbach", "Weic_nv": "0", "Kraftwerksnummer": "BNA1811", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE931076336376", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE915355479251", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3430593", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE908096553144", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": "", "month_disappeared": "", "go_live": "2016-08", "go_live_year_int": 2016, "name": "GBS 2 KW Bexbach", "name_short": "GBS 2 KW Bexbach", "owner": "STEAG Battery System", "state": "saarland", "country": "germany", "lat": "49.363746", "long": "7.239967", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.363746+7.239967", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430593"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS KW Weiher", "city": "", "id": "536", "external_id": "SEE941708872783", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "536", "external_id": "SEE941708872783", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Weiher", "external_id": "SEE941708872783", "state": "saarland", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "month_disappeared": "", "lat": "49.334731", "long": "7.031127", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3395953"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE941708872783", "DatumLetzteAktualisierung": "2020-09-16T11:09:57.6813215", "LokationMaStRNummer": "SEL969113527968", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-11-03", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Regionalverband Saarbr\u00fccken", "Gemeinde": "Quierschied", "Gemeindeschluessel": "10041516", "Postleitzahl": "66287", "Strasse": "Holzer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Quierschied", "Laengengrad": "7.031127", "Breitengrad": "49.334731", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Weiher", "Weic_nv": "1", "Kraftwerksnummer": "BNA1812", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE951864355471", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE920756375613", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3395953", "ext_id": "SEE941708872783", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE941708872783", "DatumLetzteAktualisierung": "2020-09-16T11:09:57.6813215", "LokationMaStRNummer": "SEL969113527968", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-11-03", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Regionalverband Saarbr\u00fccken", "Gemeinde": "Quierschied", "Gemeindeschluessel": "10041516", "Postleitzahl": "66287", "Strasse": "Holzer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Quierschied", "Laengengrad": "7.031127", "Breitengrad": "49.334731", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Weiher", "Weic_nv": "1", "Kraftwerksnummer": "BNA1812", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE951864355471", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE920756375613", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3395953", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE941708872783", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "month_disappeared": "", "go_live": "2016-08", "go_live_year_int": 2016, "name": "GBS KW Weiher", "name_short": "GBS KW Weiher", "owner": "STEAG Battery System", "state": "saarland", "country": "germany", "lat": "49.334731", "long": "7.031127", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.334731+7.031127", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3395953"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS KW Herne", "city": "", "id": "542", "external_id": "SEE971138728251", "state": "nrw", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "542", "external_id": "SEE971138728251", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Herne", "external_id": "SEE971138728251", "state": "nrw", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "month_disappeared": "", "lat": "51.552413", "long": "7.189822", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430427"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE971138728251", "DatumLetzteAktualisierung": "2020-09-16T10:29:13.5745897", "LokationMaStRNummer": "SEL921790334635", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-06", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1409", "Landkreis": "Herne", "Gemeinde": "Herne", "Gemeindeschluessel": "05916000", "Postleitzahl": "44653", "Strasse": "Hertener Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "16", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Herne", "Laengengrad": "7.189822", "Breitengrad": "51.552413", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Herne", "Weic_nv": "1", "Kraftwerksnummer": "BNA1813", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE937682233207", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE956487017720", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3430427", "ext_id": "SEE971138728251", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE971138728251", "DatumLetzteAktualisierung": "2020-09-16T10:29:13.5745897", "LokationMaStRNummer": "SEL921790334635", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-06", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1409", "Landkreis": "Herne", "Gemeinde": "Herne", "Gemeindeschluessel": "05916000", "Postleitzahl": "44653", "Strasse": "Hertener Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "16", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Herne", "Laengengrad": "7.189822", "Breitengrad": "51.552413", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Herne", "Weic_nv": "1", "Kraftwerksnummer": "BNA1813", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE937682233207", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE956487017720", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3430427", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE971138728251", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "month_disappeared": "", "go_live": "2016-08", "go_live_year_int": 2016, "name": "GBS KW Herne", "name_short": "GBS KW Herne", "owner": "STEAG Battery System", "state": "nrw", "country": "germany", "lat": "51.552413", "long": "7.189822", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.552413+7.189822", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430427"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "RRKW Feldheim", "city": "", "id": "545", "external_id": "SEE976927444749", "state": "brandenburg", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "545", "external_id": "SEE976927444749", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "RRKW Feldheim", "external_id": "SEE976927444749", "state": "brandenburg", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "RRKW Feldheim GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": "", "month_disappeared": "", "lat": "52.009849", "long": "12.822563", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2667151"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE976927444749", "DatumLetzteAktualisierung": "2020-01-08T14:16:54.1030683", "LokationMaStRNummer": "SEL934579389085", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2021-10-28", "AnlagenbetreiberMastrNummer": "ABR996025035908", "Land": "84", "Bundesland": "1400", "Landkreis": "Potsdam-Mittelmark", "Gemeinde": "Treuenbrietzen", "Gemeindeschluessel": "12069632", "Postleitzahl": "14929", "Strasse": "Hinter den G\u00e4rten", "StrasseNichtGefunden": "0", "Hausnummer": "15 b", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Treuenbrietzen", "Laengengrad": "12.822563", "Breitengrad": "52.009849", "Registrierungsdatum": "2020-01-08", "Inbetriebnahmedatum": "2016-07-26", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "RRKW Feldheim", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "1234567891234", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "BestandteilGrenzkraftwerk": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE948227511988", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 10, "pr_url_id": "2667151", "ext_id": "SEE976927444749", "mw": 10, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2021-10-28", "to": "2022-03-03", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-01-08T14:16:54.1030683", "to": "2022-05-04T10:40:15.0620181", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2022-03-03", "to": "2022-07-07", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE976927444749", "DatumLetzteAktualisierung": "2022-05-04T10:40:15.0620181", "LokationMaStRNummer": "SEL934579389085", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-07-07", "AnlagenbetreiberMastrNummer": "ABR996025035908", "Land": "84", "Bundesland": "1400", "Landkreis": "Potsdam-Mittelmark", "Gemeinde": "Treuenbrietzen", "Gemeindeschluessel": "12069632", "Postleitzahl": "14929", "Strasse": "Hinter den G\u00e4rten", "StrasseNichtGefunden": "0", "Hausnummer": "15 b", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Treuenbrietzen", "Laengengrad": "12.822563", "Breitengrad": "52.009849", "Registrierungsdatum": "2020-01-08", "Inbetriebnahmedatum": "2016-07-26", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "RRKW Feldheim", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "1234567891234", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE948227511988", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2667151", "owner": "RRKW Feldheim GmbH \uff06 Co. KG", "mwh": 10, "ext_id": "SEE976927444749", "mw": 10, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": "", "month_disappeared": "", "go_live": "2016-07", "go_live_year_int": 2016, "name": "RRKW Feldheim", "name_short": "RRKW Feldheim", "owner": "RRKW Feldheim GmbH \uff06 Co. KG", "state": "brandenburg", "country": "germany", "lat": "52.009849", "long": "12.822563", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.009849+12.822563", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2667151"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scampitella", "city": "", "id": "131", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "72", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / fluence", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.082553", "long": "15.342974", "coords_hint": "1", "use_case": "", "notes": "fluence claims it is from them, but in the nidec pdf the also mention it, not quite sure...", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://blog.fluenceenergy.com/enel-x-taps-fluence-gridstack-storage-product-to-deliver-fast-reserve-services-in-italy", "link3": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link4": ""}, "internal_id": "131", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 72, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2016-01", "go_live_year_int": 2016, "name": "Scampitella", "name_short": "Scampitella", "owner": "Terna", "state": "", "country": "italy", "lat": "41.082553", "long": "15.342974", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.082553+15.342974", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["fluence claims it is from them, but in the nidec pdf the also mention it, not quite sure..."], "links": ["https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "https://blog.fluenceenergy.com/enel-x-taps-fluence-gridstack-storage-product-to-deliver-fast-reserve-services-in-italy", "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ginestra", "city": "", "id": "132", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / nidec", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.285189", "long": "15.072551", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link3": "https://www.ngk-insulators.com/en/product/nas-solutions.html", "link4": ""}, "internal_id": "132", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2016-01", "go_live_year_int": 2016, "name": "Ginestra", "name_short": "Ginestra", "owner": "Terna", "state": "", "country": "italy", "lat": "41.285189", "long": "15.072551", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.285189+15.072551", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "https://www.ngk-insulators.com/en/product/nas-solutions.html"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Flumeri", "city": "", "id": "133", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / nidec", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.067966", "long": "15.123332", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link3": "", "link4": ""}, "internal_id": "133", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2016-01", "go_live_year_int": 2016, "name": "Flumeri", "name_short": "Flumeri", "owner": "Terna", "state": "", "country": "italy", "lat": "41.067966", "long": "15.123332", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.067966+15.123332", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES Kilroot Station Battery Storage Array", "city": "", "id": "259", "external_id": "6845", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "AES Kilroot Power (AES KPL)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2015-11-18", "start_operation": "2016-01-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "259", "external_id": "6845", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "AES Kilroot Station Battery Storage Array", "external_id": "6845", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "AES Kilroot Power (AES KPL)", "status": "operation", "date_first_heard": "2018-12-12", "start_construction": "2015-11-18", "start_operation": "2016-01-18", "start_estimated": "", "month_disappeared": "", "lat": "54.724406", "long": "-5.767212", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6845", "Record Last Updated (dd/mm/yyyy)": "12/12/2018", "Operator (or Applicant)": "AES Kilroot Power (AES KPL)", "Site Name": "AES Kilroot Station Battery Storage Array", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Carrickfergus", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT38 7LX", "X-coordinate": "157517", "Y-coordinate": "543117", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "18/11/2015", "Operational": "18/01/2016", "Heat Network Ref": "", "lat": "54.724406", "long": "-5.767212", "status": "operation", "mw": 10, "ext_id": "6845"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/12/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6845", "Record Last Updated (dd/mm/yyyy)": "12/12/2018", "Operator (or Applicant)": "AES Kilroot Power (AES KPL)", "Site Name": "AES Kilroot Station Battery Storage Array", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrickfergus", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT38 7LX", "X-coordinate": "157517", "Y-coordinate": "543117", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "18/11/2015", "Operational": "18/01/2016", "Heat Network Ref": "", "lat": "54.724406", "long": "-5.767212", "status": "operation", "mw": 10, "ext_id": "6845"}, "current_month": "2024-01", "dates": {"first_heard": "2018-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-12-12", "start_construction": "2015-11-18", "start_operation": "2016-01-18", "start_estimated": "", "month_disappeared": "", "go_live": "2016-01", "go_live_year_int": 2016, "name": "AES Kilroot Station Battery Storage Array", "name_short": "AES Kilroot Station Battery Storage...", "owner": "AES Kilroot Power (AES KPL)", "state": "northern ireland", "country": "uk", "lat": "54.724406", "long": "-5.767212", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.724406+-5.767212", "construction_time_month": 2, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sienna Solar Farm", "city": "", "id": "163", "external_id": "64632", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "99MT 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "163", "external_id": "64632", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sienna Solar Farm", "external_id": "64632", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "99MT 8me, LLC", "status": "planning", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"99MTB": {"first": {"year": "2024", "month": "12", "entity id": "64246", "entity name": "99MT 8me, LLC", "plant producer type": "IPP", "plant name": "Sienna Solar Farm", "plant state": "CA", "plant id": "64632", "generator id": "99MTB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64632", "date": "2024-12", "mw": 200}, "first_month": "2021-06", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2028-12", "extra": "delayed by 48 months", "change_type": "timing"}]}], "current": {"year": "2028", "month": "12", "entity id": "64246", "entity name": "99MT 8me, LLC", "plant producer type": "IPP", "plant name": "Sienna Solar Farm", "plant state": "CA", "plant id": "64632", "generator id": "99MTB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64632", "date": "2028-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-12", "month_disappeared": "", "go_live": "0 ~ 2028-12", "go_live_year_int": 2028, "name": "Sienna Solar Farm", "name_short": "Sienna Solar Farm", "owner": "99MT 8me, LLC", "state": "california", "country": "usa", "lat": "41.273154160953744", "long": "-121.1907209430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.273154160953744+-121.1907209430736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KCE CT 1, LLC", "city": "", "id": "1042", "external_id": "66879", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "210", "power_mw": "105", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1042", "external_id": "66879", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KCE CT 1, LLC", "external_id": "66879", "state": "connecticut", "country": "usa", "mwh": 0, "estimate_mwh": 210, "power_mw": 105, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2028-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CT1": {"first": {"year": "2027", "month": "5", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE CT 1, LLC", "plant state": "CT", "plant id": "66879", "generator id": "CT1", "net summer capacity (mw)": "105", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66879", "date": "2027-05", "mw": 105}, "first_month": "2023-09", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2027-05", "to": "2028-10", "extra": "delayed by 17 months", "change_type": "timing"}]}], "current": {"year": "2028", "month": "10", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE CT 1, LLC", "plant state": "CT", "plant id": "66879", "generator id": "CT1", "net summer capacity (mw)": "105", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66879", "date": "2028-10", "mw": 105}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 105, "mwh_is_estimate": true, "mwh": 210, "mwh_estimate": 210, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2028-10", "month_disappeared": "", "go_live": "0 ~ 2028-10", "go_live_year_int": 2028, "name": "KCE CT 1, LLC", "name_short": "KCE CT 1", "owner": "Key Capture Energy", "state": "connecticut", "country": "usa", "lat": "41.97707037128426", "long": "-71.9315418926975", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.97707037128426+-71.9315418926975", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Grid Intrepid", "city": "", "id": "1050", "external_id": "66911", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Hecate Grid Intrepid 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1050", "external_id": "66911", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Grid Intrepid", "external_id": "66911", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Hecate Grid Intrepid 1 LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2028-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"HGIN1": {"first": {"year": "2028", "month": "7", "entity id": "65821", "entity name": "Hecate Grid Intrepid 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Intrepid", "plant state": "NY", "plant id": "66911", "generator id": "HGIN1", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66911", "date": "2028-07", "mw": 250}, "first_month": "2023-09", "changes": [], "current": {"year": "2028", "month": "7", "entity id": "65821", "entity name": "Hecate Grid Intrepid 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Intrepid", "plant state": "NY", "plant id": "66911", "generator id": "HGIN1", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66911", "date": "2028-07", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}, "HGIN6": {"first": {"year": "2028", "month": "7", "entity id": "65821", "entity name": "Hecate Grid Intrepid 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Intrepid", "plant state": "NY", "plant id": "66911", "generator id": "HGIN6", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66911", "date": "2028-07", "mw": 50}, "first_month": "2023-09", "changes": [], "current": {"year": "2028", "month": "7", "entity id": "65821", "entity name": "Hecate Grid Intrepid 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Intrepid", "plant state": "NY", "plant id": "66911", "generator id": "HGIN6", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66911", "date": "2028-07", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2028-07", "month_disappeared": "", "go_live": "0 ~ 2028-07", "go_live_year_int": 2028, "name": "Hecate Grid Intrepid", "name_short": "Hecate Grid Intrepid", "owner": "Hecate Grid Intrepid 1 LLC", "state": "new york", "country": "usa", "lat": "42.652007", "long": "-75.60354", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.652007+-75.60354", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackcat BESS", "city": "", "id": "1361", "external_id": "67558", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1361", "external_id": "67558", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blackcat BESS", "external_id": "67558", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "RIC Development, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RIC96": {"first": {"year": "2028", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Blackcat BESS", "plant state": "TX", "plant id": "67558", "generator id": "RIC96", "net summer capacity (mw)": "200.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67558", "date": "2028-04", "mw": 200}, "first_month": "2024-06", "changes": [], "current": {"year": "2028", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Blackcat BESS", "plant state": "TX", "plant id": "67558", "generator id": "RIC96", "net summer capacity (mw)": "200.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67558", "date": "2028-04", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "month_disappeared": "", "go_live": "0 ~ 2028-04", "go_live_year_int": 2028, "name": "Blackcat BESS", "name_short": "Blackcat", "owner": "RIC Development, LLC", "state": "texas", "country": "usa", "lat": "33.49793441320124", "long": "-95.13838797468608", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.49793441320124+-95.13838797468608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Serrano BESS", "city": "", "id": "1363", "external_id": "67556", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1363", "external_id": "67556", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Serrano BESS", "external_id": "67556", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "RIC Development, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RIC97": {"first": {"year": "2028", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Serrano BESS", "plant state": "TX", "plant id": "67556", "generator id": "RIC97", "net summer capacity (mw)": "185.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67556", "date": "2028-04", "mw": 185}, "first_month": "2024-06", "changes": [], "current": {"year": "2028", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Serrano BESS", "plant state": "TX", "plant id": "67556", "generator id": "RIC97", "net summer capacity (mw)": "185.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67556", "date": "2028-04", "mw": 185}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": true, "mwh": 370, "mwh_estimate": 370, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "month_disappeared": "", "go_live": "0 ~ 2028-04", "go_live_year_int": 2028, "name": "Serrano BESS", "name_short": "Serrano", "owner": "RIC Development, LLC", "state": "texas", "country": "usa", "lat": "33.60453116095374", "long": "-95.1641099430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.60453116095374+-95.1641099430736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cold Creek Solar", "city": "", "id": "1027", "external_id": "66674", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Cold Creek Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1027", "external_id": "66674", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cold Creek Solar", "external_id": "66674", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Cold Creek Solar, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2028-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CCBA": {"first": {"year": "2028", "month": "1", "entity id": "65688", "entity name": "Cold Creek Solar, LLC", "plant producer type": "IPP", "plant name": "Cold Creek Solar", "plant state": "NY", "plant id": "66674", "generator id": "CCBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66674", "date": "2028-01", "mw": 20}, "first_month": "2023-07", "changes": [], "current": {"year": "2028", "month": "1", "entity id": "65688", "entity name": "Cold Creek Solar, LLC", "plant producer type": "IPP", "plant name": "Cold Creek Solar", "plant state": "NY", "plant id": "66674", "generator id": "CCBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66674", "date": "2028-01", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2028-01", "month_disappeared": "", "go_live": "0 ~ 2028-01", "go_live_year_int": 2028, "name": "Cold Creek Solar", "name_short": "Cold Creek Solar", "owner": "Cold Creek Solar, LLC", "state": "new york", "country": "usa", "lat": "42.80895629690874", "long": "-75.61757033894474", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.80895629690874+-75.61757033894474", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kingsley Solar Farm", "city": "", "id": "159", "external_id": "64634", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "720", "power_mw": "360", "customer": "", "owner": "90FI 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "159", "external_id": "64634", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kingsley Solar Farm", "external_id": "64634", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 148, "power_mw": 74, "owner": "90FI 8me, LLC", "status": "planning", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"90FIB": {"first": {"year": "2024", "month": "6", "entity id": "64245", "entity name": "90FI 8me, LLC", "plant producer type": "IPP", "plant name": "Kingsley Solar Farm", "plant state": "CA", "plant id": "64634", "generator id": "90FIB", "net summer capacity (mw)": "360", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64634", "date": "2024-06", "mw": 360}, "first_month": "2021-06", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-06", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2025-06", "to": "2027-12", "extra": "delayed by 30 months", "change_type": "timing"}, {"name": "mw", "from": 360, "to": 74, "extra": "", "change_type": "misc"}]}], "current": {"year": "2027", "month": "12", "entity id": "64245", "entity name": "90FI 8me, LLC", "plant producer type": "IPP", "plant name": "Kingsley Solar Farm", "plant state": "CA", "plant id": "64634", "generator id": "90FIB", "net summer capacity (mw)": "74", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64634", "date": "2027-12", "mw": 74}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 74, "mwh_is_estimate": true, "mwh": 148, "mwh_estimate": 148, "status": "planning", "status_class": "", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Kingsley Solar Farm", "name_short": "Kingsley Solar Farm", "owner": "90FI 8me, LLC", "state": "california", "country": "usa", "lat": "41.03058993567627", "long": "-121.01663415814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.03058993567627+-121.01663415814404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Ripley Solar", "city": "", "id": "562", "external_id": "64911", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "ConnectGen Chautauqua County LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "562", "external_id": "64911", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "South Ripley Solar", "external_id": "64911", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "ConnectGen Chautauqua County LLC", "status": "planning", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CSRB1": {"first": {"year": "2023", "month": "12", "entity id": "64389", "entity name": "ConnectGen Chautauqua County LLC", "plant producer type": "IPP", "plant name": "South Ripley Solar", "plant state": "NY", "plant id": "64911", "generator id": "CSRB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64911", "date": "2023-12", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2026-12", "to": "2027-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "64389", "entity name": "ConnectGen Chautauqua County LLC", "plant producer type": "IPP", "plant name": "South Ripley Solar", "plant state": "NY", "plant id": "64911", "generator id": "CSRB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64911", "date": "2027-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "South Ripley Solar", "name_short": "South Ripley Solar", "owner": "ConnectGen Chautauqua County LLC", "state": "new york", "country": "usa", "lat": "42.74840378137596", "long": "-75.3708612129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.74840378137596+-75.3708612129225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arida Solar (Hybrid)", "city": "", "id": "576", "external_id": "63841", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "326FW 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "576", "external_id": "63841", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arida Solar (Hybrid)", "external_id": "63841", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 740, "power_mw": 370, "owner": "326FW 8me LLC", "status": "planning", "date_first_heard": "2022-01", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "10", "entity id": "63520", "entity name": "326FW 8me LLC", "plant producer type": "IPP", "plant name": "Arida Solar (Hybrid)", "plant state": "NV", "plant id": "63841", "generator id": "BESS", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63841", "date": "2024-10", "mw": 185}, "first_month": "2022-01", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-10", "to": "2027-06", "extra": "delayed by 32 months", "change_type": "timing"}, {"name": "mw", "from": 185, "to": 370, "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2027-06", "to": "2027-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "63520", "entity name": "326FW 8me LLC", "plant producer type": "IPP", "plant name": "Arida Solar (Hybrid)", "plant state": "NV", "plant id": "63841", "generator id": "BESS", "net summer capacity (mw)": "370", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63841", "date": "2027-12", "mw": 370}, "current_month": "2024-06", "dates": {"first_heard": "2022-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 370, "mwh_is_estimate": true, "mwh": 740, "mwh_estimate": 740, "status": "planning", "status_class": "", "date_first_heard": "2022-01", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Arida Solar (Hybrid)", "name_short": "Arida Solar (Hybrid)", "owner": "326FW 8me LLC", "state": "nevada", "country": "usa", "lat": "41.28470862756772", "long": "-114.82195337753002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.28470862756772+-114.82195337753002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beartooth Energy Storage LLC", "city": "", "id": "682", "external_id": "65407", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Beartooth Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "682", "external_id": "65407", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beartooth Energy Storage LLC", "external_id": "65407", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Beartooth Energy Storage, LLC", "status": "planning", "date_first_heard": "2022-04", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BEAR1": {"first": {"year": "2024", "month": "4", "entity id": "64736", "entity name": "Beartooth Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Beartooth Energy Storage LLC", "plant state": "MT", "plant id": "65407", "generator id": "BEAR1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65407", "date": "2024-04", "mw": 50}, "first_month": "2022-04", "changes": [{"month": "2023-06", "li": [{"name": "date", "from": "2024-04", "to": "2027-12", "extra": "delayed by 44 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "64736", "entity name": "Beartooth Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Beartooth Energy Storage LLC", "plant state": "MT", "plant id": "65407", "generator id": "BEAR1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65407", "date": "2027-12", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-04", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Beartooth Energy Storage LLC", "name_short": "Beartooth Energy Storage", "owner": "Beartooth Energy Storage, LLC", "state": "montana", "country": "usa", "lat": "48.77072319146767", "long": "-105.5563965331475", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.77072319146767+-105.5563965331475", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crane 2 BESS 2", "city": "", "id": "987", "external_id": "66300", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "987", "external_id": "66300", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Crane 2 BESS 2", "external_id": "66300", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CRBS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Crane 2 BESS 2", "plant state": "TX", "plant id": "66300", "generator id": "CRBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66300", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2027-12", "extra": "delayed by 36 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Crane 2 BESS 2", "plant state": "TX", "plant id": "66300", "generator id": "CRBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66300", "date": "2027-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Crane 2 BESS 2", "name_short": "Crane 2 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.70808533623373", "long": "-95.45800256921983", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.70808533623373+-95.45800256921983", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Uvalde 2 BESS 2", "city": "", "id": "989", "external_id": "66305", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "989", "external_id": "66305", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Uvalde 2 BESS 2", "external_id": "66305", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UVBS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Uvalde 2 BESS 2", "plant state": "TX", "plant id": "66305", "generator id": "UVBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66305", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2027-12", "extra": "delayed by 36 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Uvalde 2 BESS 2", "plant state": "TX", "plant id": "66305", "generator id": "UVBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66305", "date": "2027-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Uvalde 2 BESS 2", "name_short": "Uvalde 2 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.56468208398623", "long": "-95.61391623283366", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.56468208398623+-95.61391623283366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Uvalde 2 BESS 1", "city": "", "id": "1001", "external_id": "66304", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1001", "external_id": "66304", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Uvalde 2 BESS 1", "external_id": "66304", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UVBS1": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Uvalde 2 BESS 1", "plant state": "TX", "plant id": "66304", "generator id": "UVBS1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66304", "date": "2024-05", "mw": 75}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2027-12", "extra": "delayed by 36 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Uvalde 2 BESS 1", "plant state": "TX", "plant id": "66304", "generator id": "UVBS1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66304", "date": "2027-12", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Uvalde 2 BESS 1", "name_short": "Uvalde 2 BESS 1", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.46085237387625", "long": "-95.2525147566415", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.46085237387625+-95.2525147566415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bonanza Solar and Storage Project", "city": "", "id": "1049", "external_id": "66908", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "390", "power_mw": "195", "customer": "", "owner": "EDF Renewables Development, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1049", "external_id": "66908", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bonanza Solar and Storage Project", "external_id": "66908", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 390, "power_mw": 195, "owner": "EDF Renewables Development, Inc.", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BZES": {"first": {"year": "2027", "month": "12", "entity id": "64452", "entity name": "EDF Renewables Development, Inc.", "plant producer type": "IPP", "plant name": "Bonanza Solar and Storage Project", "plant state": "NV", "plant id": "66908", "generator id": "BZES", "net summer capacity (mw)": "195", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66908", "date": "2027-12", "mw": 195}, "first_month": "2023-09", "changes": [], "current": {"year": "2027", "month": "12", "entity id": "64452", "entity name": "EDF Renewables Development, Inc.", "plant producer type": "IPP", "plant name": "Bonanza Solar and Storage Project", "plant state": "NV", "plant id": "66908", "generator id": "BZES", "net summer capacity (mw)": "195", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66908", "date": "2027-12", "mw": 195}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 195, "mwh_is_estimate": true, "mwh": 390, "mwh_estimate": 390, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Bonanza Solar and Storage Project", "name_short": "Bonanza Solar and Storage", "owner": "EDF Renewables Development, Inc.", "state": "nevada", "country": "usa", "lat": "41.629302724436236", "long": "-115.17039971153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.629302724436236+-115.17039971153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lupinus Solar 2, LLC", "city": "", "id": "1057", "external_id": "66896", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "244", "power_mw": "122", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1057", "external_id": "66896", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lupinus Solar 2, LLC", "external_id": "66896", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 244, "power_mw": 122, "owner": "Sunraycer Assets I LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LP2BA": {"first": {"year": "2027", "month": "12", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Lupinus Solar 2, LLC", "plant state": "TX", "plant id": "66896", "generator id": "LP2BA", "net summer capacity (mw)": "122.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66896", "date": "2027-12", "mw": 122}, "first_month": "2023-09", "changes": [], "current": {"year": "2027", "month": "12", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Lupinus Solar 2, LLC", "plant state": "TX", "plant id": "66896", "generator id": "LP2BA", "net summer capacity (mw)": "122.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66896", "date": "2027-12", "mw": 122}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 122, "mwh_is_estimate": true, "mwh": 244, "mwh_estimate": 244, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Lupinus Solar 2, LLC", "name_short": "Lupinus Solar 2", "owner": "Sunraycer Assets I LLC", "state": "texas", "country": "usa", "lat": "33.24856368342876", "long": "-95.12414054591771", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.24856368342876+-95.12414054591771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Powell Solar", "city": "", "id": "1316", "external_id": "67157", "state": "oregon", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1316", "external_id": "67157", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Powell Solar", "external_id": "67157", "state": "oregon", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Invenergy Services LLC", "status": "planning", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2027", "month": "12", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Powell Solar", "plant state": "OR", "plant id": "67157", "generator id": "BESS1", "net summer capacity (mw)": "20.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67157", "date": "2027-12", "mw": 20}, "first_month": "2024-02", "changes": [], "current": {"year": "2027", "month": "12", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Powell Solar", "plant state": "OR", "plant id": "67157", "generator id": "BESS1", "net summer capacity (mw)": "20.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67157", "date": "2027-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Powell Solar", "name_short": "Powell Solar", "owner": "Invenergy Services LLC", "state": "oregon", "country": "usa", "lat": "45.45769240952313", "long": "-118.089015416855", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:45.45769240952313+-118.089015416855", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kahana Solar, LLC", "city": "", "id": "215", "external_id": "64095", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Kahana Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "215", "external_id": "64095", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kahana Solar, LLC", "external_id": "64095", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "AES Clean Energy", "status": "planning", "date_first_heard": "2020-11", "start_construction": "", "start_operation": "", "start_estimated": "2027-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KSBA": {"first": {"year": "2023", "month": "12", "entity id": "63703", "entity name": "Kahana Solar, LLC", "plant producer type": "IPP", "plant name": "Kahana Solar, LLC", "plant state": "HI", "plant id": "64095", "generator id": "KSBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64095", "date": "2023-12", "mw": 20}, "first_month": "2020-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-12", "to": "2027-11", "extra": "delayed by 35 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "entity id", "from": "63703", "to": "64904", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Kahana Solar, LLC", "to": "AES Clean Energy", "extra": "", "change_type": "misc"}]}], "current": {"year": "2027", "month": "11", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Kahana Solar, LLC", "plant state": "HI", "plant id": "64095", "generator id": "KSBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64095", "date": "2027-11", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2020-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2020-11", "start_construction": "", "start_operation": "", "start_estimated": "2027-11", "month_disappeared": "", "go_live": "0 ~ 2027-11", "go_live_year_int": 2027, "name": "Kahana Solar, LLC", "name_short": "Kahana Solar", "owner": "AES Clean Energy", "state": "hawaii", "country": "usa", "lat": "19.481845", "long": "-155.513535", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.481845+-155.513535", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Red Antelope Solar & Energy Storage Farm", "city": "", "id": "144", "external_id": "64208", "state": "arizona", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "302PN 8me LLC", "developer": "8 minute", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.712788", "long": "-111.290085", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "", "project_website": "", "link1": "https://lakepowellchronicle.com/article/4000-acre-solar-project-proposed-near-page", "link2": "", "link3": "", "link4": ""}, "internal_id": "144", "external_id": "64208", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Red Antelope Solar & Energy Storage Farm", "external_id": "64208", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "302PN 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"30PNB": {"first": {"year": "2023", "month": "6", "entity id": "63807", "entity name": "302PN 8me LLC", "plant producer type": "IPP", "plant name": "Red Antelope Solar & Energy Storage Farm", "plant state": "AZ", "plant id": "64208", "generator id": "30PNB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64208", "date": "2023-06", "mw": 500}, "first_month": "2021-01", "changes": [{"month": "2022-02", "li": [{"name": "date", "from": "2023-06", "to": "2024-11", "extra": "delayed by 17 months", "change_type": "timing"}, {"name": "mw", "from": 500, "to": 300, "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-11", "to": "2027-05", "extra": "delayed by 30 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "5", "entity id": "63807", "entity name": "302PN 8me LLC", "plant producer type": "IPP", "plant name": "Red Antelope Solar & Energy Storage Farm", "plant state": "AZ", "plant id": "64208", "generator id": "30PNB", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64208", "date": "2027-05", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": false, "mwh": 1200, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "go_live": "0 ~ 2027-05", "go_live_year_int": 2027, "name": "Red Antelope Solar & Energy Storage Farm", "name_short": "Red Antelope Solar & Energy Storage...", "owner": "302PN 8me LLC", "state": "arizona", "country": "usa", "lat": "36.712788", "long": "-111.290085", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.712788+-111.290085", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://lakepowellchronicle.com/article/4000-acre-solar-project-proposed-near-page"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dynegy Oakland Power Plant", "city": "", "id": "185", "external_id": "6211", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72.6", "power_mw": "36.3", "customer": "", "owner": "Dynegy Oakland, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "185", "external_id": "6211", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dynegy Oakland Power Plant", "external_id": "6211", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 86, "power_mw": 43, "owner": "Dynegy Oakland, LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN4": {"first": {"year": "2022", "month": "12", "entity id": "54803", "entity name": "Dynegy Oakland, LLC", "plant producer type": "IPP", "plant name": "Dynegy Oakland Power Plant", "plant state": "CA", "plant id": "6211", "generator id": "GEN4", "net summer capacity (mw)": "36.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "6211", "date": "2022-12", "mw": 36}, "first_month": "2020-09", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-12", "to": "2023-07", "extra": "delayed by 7 months", "change_type": "timing"}, {"name": "mw", "from": 36, "to": 43, "extra": "", "change_type": "misc"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-07", "to": "2023-12", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-11", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-11", "to": "2027-05", "extra": "delayed by 30 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "5", "entity id": "54803", "entity name": "Dynegy Oakland, LLC", "plant producer type": "IPP", "plant name": "Dynegy Oakland Power Plant", "plant state": "CA", "plant id": "6211", "generator id": "GEN4", "net summer capacity (mw)": "43.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "6211", "date": "2027-05", "mw": 43}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 43, "mwh_is_estimate": true, "mwh": 86, "mwh_estimate": 86, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "go_live": "0 ~ 2027-05", "go_live_year_int": 2027, "name": "Dynegy Oakland Power Plant", "name_short": "Dynegy Oakland", "owner": "Dynegy Oakland, LLC", "state": "california", "country": "usa", "lat": "41.392677000000006", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.392677000000006+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Southern Bighorn Solar Hybrid", "city": "", "id": "227", "external_id": "63113", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "300MS 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "227", "external_id": "63113", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Southern Bighorn Solar Hybrid", "external_id": "63113", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "300MS 8me LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "9", "entity id": "62910", "entity name": "300MS 8me LLC", "plant producer type": "IPP", "plant name": "Southern Bighorn Solar Hybrid", "plant state": "NV", "plant id": "63113", "generator id": "BESS", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63113", "date": "2023-09", "mw": 135}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "date", "from": "2023-09", "to": "2024-04", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2024-04", "to": "2026-05", "extra": "delayed by 25 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2026-05", "to": "2027-05", "extra": "delayed by 12 months", "change_type": "timing"}, {"name": "mw", "from": 135, "to": 300, "extra": "", "change_type": "misc"}]}], "current": {"year": "2027", "month": "5", "entity id": "62910", "entity name": "300MS 8me LLC", "plant producer type": "IPP", "plant name": "Southern Bighorn Solar Hybrid", "plant state": "NV", "plant id": "63113", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63113", "date": "2027-05", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "go_live": "0 ~ 2027-05", "go_live_year_int": 2027, "name": "Southern Bighorn Solar Hybrid", "name_short": "Southern Bighorn Solar", "owner": "300MS 8me LLC", "state": "nevada", "country": "usa", "lat": "41.70034529690874", "long": "-115.02003633894475", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.70034529690874+-115.02003633894475", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aragon Energy Storage", "city": "", "id": "967", "external_id": "66431", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Aragon Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "967", "external_id": "66431", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Aragon Energy Storage", "external_id": "66431", "state": "georgia", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Aragon Energy Storage LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARAG1": {"first": {"year": "2026", "month": "10", "entity id": "65511", "entity name": "Aragon Energy Storage LLC", "plant producer type": "IPP", "plant name": "Aragon Energy Storage", "plant state": "GA", "plant id": "66431", "generator id": "ARAG1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66431", "date": "2026-10", "mw": 150}, "first_month": "2023-04", "changes": [{"month": "2024-03", "li": [{"name": "date", "from": "2026-10", "to": "2027-04", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "4", "entity id": "65511", "entity name": "Aragon Energy Storage LLC", "plant producer type": "IPP", "plant name": "Aragon Energy Storage", "plant state": "GA", "plant id": "66431", "generator id": "ARAG1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66431", "date": "2027-04", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "month_disappeared": "", "go_live": "0 ~ 2027-04", "go_live_year_int": 2027, "name": "Aragon Energy Storage", "name_short": "Aragon", "owner": "Aragon Energy Storage LLC", "state": "georgia", "country": "usa", "lat": "32.42626065645874", "long": "-82.16026015912814", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.42626065645874+-82.16026015912814", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jim Wells BESS", "city": "", "id": "1366", "external_id": "67553", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1366", "external_id": "67553", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Jim Wells BESS", "external_id": "67553", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "RIC Development, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RIC99": {"first": {"year": "2027", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Jim Wells BESS", "plant state": "TX", "plant id": "67553", "generator id": "RIC99", "net summer capacity (mw)": "100.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67553", "date": "2027-04", "mw": 100}, "first_month": "2024-06", "changes": [], "current": {"year": "2027", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Jim Wells BESS", "plant state": "TX", "plant id": "67553", "generator id": "RIC99", "net summer capacity (mw)": "100.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67553", "date": "2027-04", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "month_disappeared": "", "go_live": "0 ~ 2027-04", "go_live_year_int": 2027, "name": "Jim Wells BESS", "name_short": "Jim Wells", "owner": "RIC Development, LLC", "state": "texas", "country": "usa", "lat": "33.69372024210638", "long": "-95.35131028258249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.69372024210638+-95.35131028258249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Xlinks (Morocco UK)", "city": "", "id": "124", "external_id": "", "state": "", "country": "morocco", "capacity_mwh": "20000", "estimate_mwh": "", "power_mw": "5000", "customer": "", "owner": "xlinks", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-04", "start_construction": "", "start_operation": "", "start_estimated": "2027", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "28.127867", "long": "-11.599926", "coords_hint": "0", "use_case": "7000MW solar farm support ** 3500MW wind farm support ** remote generation for UK (3800km HVDC cable)", "notes": "2021: this is early stage and not guaranteed to happened, but putting it there as it is a very ambitious project and more of those are needed ** construction to start in 2025, the first systems to go onine in 2027 ** PPA at 48 GBP / Mwh ** the youtube video is a great overview", "project_website": "https://xlinks.co/morocco-uk-power-project/", "link1": "https://www.greentechmedia.com/articles/read/xlinks-revives-desertecs-dream-with-a-few-twists", "link2": "https://www.youtube.com/watch?v=iJunxkln578", "link3": "", "link4": ""}, "internal_id": "124", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 5000, "mwh_is_estimate": false, "mwh": 20000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-12-04", "start_construction": "", "start_operation": "", "start_estimated": "2027", "month_disappeared": "", "go_live": "0 ~ 2027", "go_live_year_int": 2027, "name": "Xlinks (Morocco UK)", "name_short": "Xlinks (Morocco UK)", "owner": "xlinks", "state": "", "country": "morocco", "lat": "28.127867", "long": "-11.599926", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:28.127867+-11.599926", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2021: this is early stage and not guaranteed to happened, but putting it there as it is a very ambitious project and more of those are needed ", " construction to start in 2025, the first systems to go onine in 2027 ", " PPA at 48 GBP / Mwh ", " the youtube video is a great overview"], "links": ["https://www.greentechmedia.com/articles/read/xlinks-revives-desertecs-dream-with-a-few-twists", "https://www.youtube.com/watch?v=iJunxkln578"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hornsea Project Three - Battery Storage", "city": "", "id": "1379", "external_id": "9754", "state": "eastern", "country": "uk", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "Orsted Power (UK) Limited", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1800920444276543858", "link2": "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511", "link3": "", "link4": ""}, "internal_id": "1379", "external_id": "9754", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hornsea Project Three - Battery Storage", "external_id": "9754", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Orsted Power (UK) Limited", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.575424", "long": "1.247254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9754", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "Orsted Power (UK) Limited", "Site Name": "Hornsea Project Three - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Main Road, Swardeston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR4 6US", "X-coordinate": "620129", "Y-coordinate": "302465", "Planning Authority": "South Norfolk District Council", "Planning Application Reference": "2022/0867", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.575424", "long": "1.247254", "status": "planning", "mw": 200, "ext_id": "9754"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9754", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "Orsted Power (UK) Limited", "Site Name": "Hornsea Project Three - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Main Road, Swardeston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR4 6US", "X-coordinate": "620129", "Y-coordinate": "302465", "Planning Authority": "South Norfolk District Council", "Planning Application Reference": "2022/0867", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.575424", "long": "1.247254", "status": "planning", "mw": 200, "ext_id": "9754"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "month_disappeared": "", "go_live": "0 ~ 2026Q4", "go_live_year_int": 2026, "name": "Hornsea Project Three - Battery Storage", "name_short": "Hornsea Project Three", "owner": "Orsted Power (UK) Limited", "state": "eastern", "country": "uk", "lat": "52.575424", "long": "1.247254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.575424+1.247254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://x.com/Tesla_Megapack/status/1800920444276543858", "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Netzbooster Kupferzell", "city": "Kupferzell", "id": "97", "external_id": "", "state": "bw", "country": "germany", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "TransnetBW", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-01", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "cost_million": "200", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "49.232801", "long": "9.694664", "coords_hint": "0", "use_case": "virtual transmission lines", "notes": "this is a pilot project and still it takes 5 years to build, will be interesting how long they will take for real projects then, ca 200 Million Euro costs", "project_website": "https://www.transnetbw.de/de/netzentwicklung/projekte/netzbooster-pilotanlage/projektueberblick", "link1": "https://www.transnetbw.de/files/pdf/netzentwicklung/projekte/netzbooster-pilotanlage/Vorstellung_Netzbooster.pdf", "link2": "https://www.energy-storage.news/fluence-building-250mw-grid-booster-battery-storage-system-for-german-tso-transnetbw/", "link3": "", "link4": ""}, "internal_id": "97", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2019-12-01", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "month_disappeared": "", "go_live": "0 ~ 2026Q1", "go_live_year_int": 2026, "name": "Netzbooster Kupferzell", "name_short": "Netzbooster Kupferzell", "owner": "TransnetBW", "state": "bw", "country": "germany", "lat": "49.232801", "long": "9.694664", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.232801+9.694664", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["this is a pilot project and still it takes 5 years to build, will be interesting how long they will take for real projects then, ca 200 Million Euro costs"], "links": ["https://www.transnetbw.de/files/pdf/netzentwicklung/projekte/netzbooster-pilotanlage/Vorstellung_Netzbooster.pdf", "https://www.energy-storage.news/fluence-building-250mw-grid-booster-battery-storage-system-for-german-tso-transnetbw/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clermont", "city": "Lindenhurst", "id": "126", "external_id": "64236", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.701265", "long": "-73.366732", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, "internal_id": "126", "external_id": "64236", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Clermont", "external_id": "64236", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Hecate Grid Clermont 1 LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CLRMT": {"first": {"year": "2023", "month": "12", "entity id": "63839", "entity name": "Hecate Grid Clermont 1 LLC", "plant producer type": "IPP", "plant name": "Clermont", "plant state": "NY", "plant id": "64236", "generator id": "CLRMT", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64236", "date": "2023-12", "mw": 100}, "first_month": "2021-01", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "63839", "entity name": "Hecate Grid Clermont 1 LLC", "plant producer type": "IPP", "plant name": "Clermont", "plant state": "NY", "plant id": "64236", "generator id": "CLRMT", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64236", "date": "2026-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Clermont", "name_short": "Clermont", "owner": "Hecate Grid Clermont 1 LLC", "state": "new york", "country": "usa", "lat": "40.701265", "long": "-73.366732", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.701265+-73.366732", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "NY2 Battery", "city": "", "id": "234", "external_id": "63584", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "234", "external_id": "63584", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "NY2 Battery", "external_id": "63584", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 338, "power_mw": 169, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NY2": {"first": {"year": "2021", "month": "11", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "NY2 Battery", "plant state": "NY", "plant id": "63584", "generator id": "NY2", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63584", "date": "2021-11", "mw": 200}, "first_month": "2020-09", "changes": [{"month": "2021-04", "li": [{"name": "date", "from": "2021-11", "to": "2022-11", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2022-11", "to": "2023-06", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-06", "to": "2024-06", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "mw", "from": 200, "to": 169, "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "NY2 Battery", "plant state": "NY", "plant id": "63584", "generator id": "NY2", "net summer capacity (mw)": "169", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63584", "date": "2026-12", "mw": 169}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 169, "mwh_is_estimate": true, "mwh": 338, "mwh_estimate": 338, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "NY2 Battery", "name_short": "NY2 Battery", "owner": "Key Capture Energy", "state": "new york", "country": "usa", "lat": "42.51125063558831", "long": "-75.5492745151675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.51125063558831+-75.5492745151675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dulles Solar and Storage", "city": "", "id": "564", "external_id": "65043", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Dominion Energy Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "564", "external_id": "65043", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dulles Solar and Storage", "external_id": "65043", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Dominion Energy Inc.", "status": "planning", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DUST": {"first": {"year": "2023", "month": "10", "entity id": "5248", "entity name": "Dominion Energy Inc", "plant producer type": "Electric Utility", "plant name": "Dulles Solar and Storage", "plant state": "VA", "plant id": "65043", "generator id": "DUST", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65043", "date": "2023-10", "mw": 50}, "first_month": "2021-11", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-10", "to": "2024-12", "extra": "delayed by 14 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "entity name", "from": "Dominion Energy Inc", "to": "Dominion Energy Inc.", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "5248", "entity name": "Dominion Energy Inc.", "plant producer type": "Electric Utility", "plant name": "Dulles Solar and Storage", "plant state": "VA", "plant id": "65043", "generator id": "DUST", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65043", "date": "2026-12", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Dulles Solar and Storage", "name_short": "Dulles Solar", "owner": "Dominion Energy Inc.", "state": "virginia", "country": "usa", "lat": "38.35804275538939", "long": "-77.74447446517001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.35804275538939+-77.74447446517001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sacramento Valley Energy Center, LLC", "city": "", "id": "775", "external_id": "65808", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Sacramento Valley Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "775", "external_id": "65808", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sacramento Valley Energy Center, LLC", "external_id": "65808", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Sacramento Valley Energy Center, LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BSVEC": {"first": {"year": "2024", "month": "12", "entity id": "65072", "entity name": "Sacramento Valley Energy Center, LLC", "plant producer type": "IPP", "plant name": "Sacramento Valley Energy Center, LLC", "plant state": "CA", "plant id": "65808", "generator id": "BSVEC", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65808", "date": "2024-12", "mw": 100}, "first_month": "2022-09", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2026-12", "to": "2024-12", "extra": "accelerated by 24 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "65072", "entity name": "Sacramento Valley Energy Center, LLC", "plant producer type": "IPP", "plant name": "Sacramento Valley Energy Center, LLC", "plant state": "CA", "plant id": "65808", "generator id": "BSVEC", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65808", "date": "2026-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Sacramento Valley Energy Center, LLC", "name_short": "Sacramento Valley Energy Center", "owner": "Sacramento Valley Energy Center, LLC", "state": "california", "country": "usa", "lat": "40.872677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.872677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Honey Creek Solar", "city": "", "id": "778", "external_id": "65821", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "778", "external_id": "65821", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Honey Creek Solar", "external_id": "65821", "state": "indiana", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HNYBA": {"first": {"year": "2024", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Honey Creek Solar", "plant state": "IN", "plant id": "65821", "generator id": "HNYBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65821", "date": "2024-12", "mw": 20}, "first_month": "2022-09", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Honey Creek Solar", "plant state": "IN", "plant id": "65821", "generator id": "HNYBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65821", "date": "2026-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Honey Creek Solar", "name_short": "Honey Creek Solar", "owner": "Leeward Asset Management, LLC", "state": "indiana", "country": "usa", "lat": "41.159394860275576", "long": "-85.07668862977751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.159394860275576+-85.07668862977751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elio Energy LLC", "city": "", "id": "798", "external_id": "65850", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Elio Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "798", "external_id": "65850", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elio Energy LLC", "external_id": "65850", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Elio Energy LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELIBS": {"first": {"year": "2025", "month": "6", "entity id": "65080", "entity name": "Elio Energy LLC", "plant producer type": "IPP", "plant name": "Elio Energy LLC", "plant state": "TX", "plant id": "65850", "generator id": "ELIBS", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65850", "date": "2025-06", "mw": 80}, "first_month": "2022-09", "changes": [{"month": "2023-03", "li": [{"name": "mw", "from": 80, "to": 300, "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2025-06", "to": "2026-12", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "65080", "entity name": "Elio Energy LLC", "plant producer type": "IPP", "plant name": "Elio Energy LLC", "plant state": "TX", "plant id": "65850", "generator id": "ELIBS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65850", "date": "2026-12", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Elio Energy LLC", "name_short": "Elio Energy", "owner": "Elio Energy LLC", "state": "texas", "country": "usa", "lat": "33.244802450183876", "long": "-94.98542795000252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.244802450183876+-94.98542795000252", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Buena Vista Energy LLC", "city": "", "id": "934", "external_id": "56446", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "934", "external_id": "56446", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Buena Vista Energy LLC", "external_id": "56446", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BVBAT": {"first": {"year": "2026", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Buena Vista Energy LLC", "plant state": "CA", "plant id": "56446", "generator id": "BVBAT", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "56446", "date": "2026-12", "mw": 100}, "first_month": "2023-02", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Buena Vista Energy LLC", "plant state": "CA", "plant id": "56446", "generator id": "BVBAT", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "56446", "date": "2026-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Buena Vista Energy LLC", "name_short": "Buena Vista Energy", "owner": "Leeward Asset Management, LLC", "state": "california", "country": "usa", "lat": "40.98192063558832", "long": "-121.3457835151675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98192063558832+-121.3457835151675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grey Fox Wind", "city": "", "id": "970", "external_id": "65939", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Grey Fox Wind", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "970", "external_id": "65939", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Grey Fox Wind", "external_id": "65939", "state": "illinois", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Grey Fox Wind", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WNDG2": {"first": {"year": "2026", "month": "12", "entity id": "65113", "entity name": "Grey Fox Wind", "plant producer type": "IPP", "plant name": "Grey Fox Wind", "plant state": "IL", "plant id": "65939", "generator id": "WNDG2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65939", "date": "2026-12", "mw": 150}, "first_month": "2023-05", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "65113", "entity name": "Grey Fox Wind", "plant producer type": "IPP", "plant name": "Grey Fox Wind", "plant state": "IL", "plant id": "65939", "generator id": "WNDG2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65939", "date": "2026-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Grey Fox Wind", "name_short": "Grey Fox Wind", "owner": "Grey Fox Wind", "state": "illinois", "country": "usa", "lat": "42.325716", "long": "-88.847031", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.325716+-88.847031", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Springwater Solar, LLC", "city": "", "id": "976", "external_id": "65900", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Springwater Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "976", "external_id": "65900", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Springwater Solar, LLC", "external_id": "65900", "state": "ohio", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Springwater Solar, LLC", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SPRI2": {"first": {"year": "2026", "month": "2", "entity id": "65092", "entity name": "Springwater Solar, LLC", "plant producer type": "IPP", "plant name": "Springwater Solar, LLC", "plant state": "OH", "plant id": "65900", "generator id": "SPRI2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65900", "date": "2026-02", "mw": 75}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2026-02", "to": "2026-12", "extra": "delayed by 10 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "65092", "entity name": "Springwater Solar, LLC", "plant producer type": "IPP", "plant name": "Springwater Solar, LLC", "plant state": "OH", "plant id": "65900", "generator id": "SPRI2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65900", "date": "2026-12", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Springwater Solar, LLC", "name_short": "Springwater Solar", "owner": "Springwater Solar, LLC", "state": "ohio", "country": "usa", "lat": "41.129863627567715", "long": "-81.07109237753002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.129863627567715+-81.07109237753002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upton BESS 2", "city": "", "id": "988", "external_id": "66303", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "988", "external_id": "66303", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Upton BESS 2", "external_id": "66303", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UPBS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Upton BESS 2", "plant state": "TX", "plant id": "66303", "generator id": "UPBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66303", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Upton BESS 2", "plant state": "TX", "plant id": "66303", "generator id": "UPBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66303", "date": "2026-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Upton BESS 2", "name_short": "Upton BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.65154984477027", "long": "-95.54526771010998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65154984477027+-95.54526771010998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peeler Solar, LLC", "city": "", "id": "999", "external_id": "65932", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Peeler Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "999", "external_id": "65932", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peeler Solar, LLC", "external_id": "65932", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Peeler Solar, LLC", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PEEL2": {"first": {"year": "2025", "month": "10", "entity id": "65105", "entity name": "Peeler Solar, LLC", "plant producer type": "IPP", "plant name": "Peeler Solar, LLC", "plant state": "TX", "plant id": "65932", "generator id": "PEEL2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65932", "date": "2025-10", "mw": 100}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2025-10", "to": "2026-12", "extra": "delayed by 14 months", "change_type": "timing"}, {"name": "mw", "from": 100, "to": 50, "extra": "", "change_type": "misc"}]}], "current": {"year": "2026", "month": "12", "entity id": "65105", "entity name": "Peeler Solar, LLC", "plant producer type": "IPP", "plant name": "Peeler Solar, LLC", "plant state": "TX", "plant id": "65932", "generator id": "PEEL2", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65932", "date": "2026-12", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Peeler Solar, LLC", "name_short": "Peeler Solar", "owner": "Peeler Solar, LLC", "state": "texas", "country": "usa", "lat": "33.33724557612627", "long": "-94.91393863684043", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.33724557612627+-94.91393863684043", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wildcat Solar Power Plant LLC", "city": "", "id": "1351", "external_id": "64849", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Solariant Capital, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1351", "external_id": "64849", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wildcat Solar Power Plant LLC", "external_id": "64849", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Solariant Capital, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ATMWS": {"first": {"year": "2026", "month": "12", "entity id": "64355", "entity name": "Solariant Capital, LLC", "plant producer type": "IPP", "plant name": "Wildcat Solar Power Plant LLC", "plant state": "NM", "plant id": "64849", "generator id": "ATMWS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64849", "date": "2026-12", "mw": 50}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "64355", "entity name": "Solariant Capital, LLC", "plant producer type": "IPP", "plant name": "Wildcat Solar Power Plant LLC", "plant state": "NM", "plant id": "64849", "generator id": "ATMWS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64849", "date": "2026-12", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Wildcat Solar Power Plant LLC", "name_short": "Wildcat Solar Power Plant", "owner": "Solariant Capital, LLC", "state": "new mexico", "country": "usa", "lat": "36.412160926686255", "long": "-103.794007894988", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.412160926686255+-103.794007894988", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rock Rose Energy Storage LLC", "city": "", "id": "1359", "external_id": "67249", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Rock Rose Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1359", "external_id": "67249", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rock Rose Energy Storage LLC", "external_id": "67249", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Rock Rose Energy Storage LLC", "status": "planning", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RRES": {"first": {"year": "2026", "month": "12", "entity id": "66121", "entity name": "Rock Rose Energy Storage LLC", "plant producer type": "IPP", "plant name": "Rock Rose Energy Storage LLC", "plant state": "TX", "plant id": "67249", "generator id": "RRES", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67249", "date": "2026-12", "mw": 200}, "first_month": "2024-03", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "66121", "entity name": "Rock Rose Energy Storage LLC", "plant producer type": "IPP", "plant name": "Rock Rose Energy Storage LLC", "plant state": "TX", "plant id": "67249", "generator id": "RRES", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67249", "date": "2026-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Rock Rose Energy Storage LLC", "name_short": "Rock Rose Energy Storage", "owner": "Rock Rose Energy Storage LLC", "state": "texas", "country": "usa", "lat": "33.361966935676264", "long": "-94.99002315814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.361966935676264+-94.99002315814404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SGT Hoskins Solar Project Hybrid", "city": "", "id": "1365", "external_id": "67341", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "204", "power_mw": "102", "customer": "", "owner": "SGT Hoskins Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1365", "external_id": "67341", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SGT Hoskins Solar Project Hybrid", "external_id": "67341", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 204, "power_mw": 102, "owner": "SGT Hoskins Solar Project, LLC", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NOSES": {"first": {"year": "2026", "month": "12", "entity id": "66171", "entity name": "SGT Hoskins Solar Project, LLC", "plant producer type": "IPP", "plant name": "SGT Hoskins Solar Project Hybrid", "plant state": "TX", "plant id": "67341", "generator id": "NOSES", "net summer capacity (mw)": "102.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67341", "date": "2026-12", "mw": 102}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "66171", "entity name": "SGT Hoskins Solar Project, LLC", "plant producer type": "IPP", "plant name": "SGT Hoskins Solar Project Hybrid", "plant state": "TX", "plant id": "67341", "generator id": "NOSES", "net summer capacity (mw)": "102.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67341", "date": "2026-12", "mw": 102}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 102, "mwh_is_estimate": true, "mwh": 204, "mwh_estimate": 204, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "SGT Hoskins Solar Project Hybrid", "name_short": "SGT Hoskins Solar", "owner": "SGT Hoskins Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.684053999999996", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.684053999999996+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cairos Solar and Storage", "city": "", "id": "1367", "external_id": "67581", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "154", "power_mw": "77", "customer": "", "owner": "Samsung C&T Renewables, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1367", "external_id": "67581", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cairos Solar and Storage", "external_id": "67581", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 154, "power_mw": 77, "owner": "Samsung C&T Renewables, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CIRSB": {"first": {"year": "2026", "month": "12", "entity id": "65144", "entity name": "Samsung C&T Renewables, LLC", "plant producer type": "IPP", "plant name": "Cairos Solar and Storage", "plant state": "TX", "plant id": "67581", "generator id": "CIRSB", "net summer capacity (mw)": "77.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67581", "date": "2026-12", "mw": 77}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "65144", "entity name": "Samsung C&T Renewables, LLC", "plant producer type": "IPP", "plant name": "Cairos Solar and Storage", "plant state": "TX", "plant id": "67581", "generator id": "CIRSB", "net summer capacity (mw)": "77.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67581", "date": "2026-12", "mw": 77}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 77, "mwh_is_estimate": true, "mwh": 154, "mwh_estimate": 154, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Cairos Solar and Storage", "name_short": "Cairos Solar", "owner": "Samsung C&T Renewables, LLC", "state": "texas", "country": "usa", "lat": "33.67572465645873", "long": "-95.43449115912814", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.67572465645873+-95.43449115912814", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bellefield 2 Solar & Energy Storage Farm", "city": "", "id": "157", "external_id": "64209", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "26SB 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "157", "external_id": "64209", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bellefield 2 Solar & Energy Storage Farm", "external_id": "64209", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 1000, "power_mw": 500, "owner": "26SB 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"26SBB": {"first": {"year": "2023", "month": "6", "entity id": "63806", "entity name": "26SB 8me LLC", "plant producer type": "IPP", "plant name": "Bellefield 2 Solar & Energy Storage Farm", "plant state": "CA", "plant id": "64209", "generator id": "26SBB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64209", "date": "2023-06", "mw": 500}, "first_month": "2021-01", "changes": [{"month": "2022-02", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2024-12", "to": "2026-11", "extra": "delayed by 23 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "11", "entity id": "63806", "entity name": "26SB 8me LLC", "plant producer type": "IPP", "plant name": "Bellefield 2 Solar & Energy Storage Farm", "plant state": "CA", "plant id": "64209", "generator id": "26SBB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64209", "date": "2026-11", "mw": 500}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 500, "mwh_is_estimate": true, "mwh": 1000, "mwh_estimate": 1000, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "go_live": "0 ~ 2026-11", "go_live_year_int": 2026, "name": "Bellefield 2 Solar & Energy Storage Farm", "name_short": "Bellefield 2 Solar & Energy Storage...", "owner": "26SB 8me LLC", "state": "california", "country": "usa", "lat": "40.91718668342877", "long": "-121.15075154591771", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.91718668342877+-121.15075154591771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Deer Wood Storage, LLC", "city": "", "id": "580", "external_id": "65145", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Deer Wood Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "580", "external_id": "65145", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Deer Wood Storage, LLC", "external_id": "65145", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Deer Wood Storage, LLC", "status": "planning", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ENX12": {"first": {"year": "2025", "month": "4", "entity id": "64519", "entity name": "Deer Wood Storage, LLC", "plant producer type": "IPP", "plant name": "Deer Wood Storage, LLC", "plant state": "VA", "plant id": "65145", "generator id": "ENX12", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65145", "date": "2025-04", "mw": 30}, "first_month": "2021-12", "changes": [{"month": "2024-03", "li": [{"name": "date", "from": "2025-04", "to": "2026-11", "extra": "delayed by 19 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "11", "entity id": "64519", "entity name": "Deer Wood Storage, LLC", "plant producer type": "IPP", "plant name": "Deer Wood Storage, LLC", "plant state": "VA", "plant id": "65145", "generator id": "ENX12", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65145", "date": "2026-11", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "go_live": "0 ~ 2026-11", "go_live_year_int": 2026, "name": "Deer Wood Storage, LLC", "name_short": "Deer Wood Storage", "owner": "Deer Wood Storage, LLC", "state": "virginia", "country": "usa", "lat": "38.160223", "long": "-77.64875", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.160223+-77.64875", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trestles Grid LLC", "city": "", "id": "1335", "external_id": "67229", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Trestles Grid LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1335", "external_id": "67229", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Trestles Grid LLC", "external_id": "67229", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Trestles Grid LLC", "status": "construction", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HGLPT": {"first": {"year": "2026", "month": "11", "entity id": "66105", "entity name": "Trestles Grid LLC", "plant producer type": "IPP", "plant name": "Trestles Grid LLC", "plant state": "CA", "plant id": "67229", "generator id": "HGLPT", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67229", "date": "2026-11", "mw": 150}, "first_month": "2024-03", "changes": [], "current": {"year": "2026", "month": "11", "entity id": "66105", "entity name": "Trestles Grid LLC", "plant producer type": "IPP", "plant name": "Trestles Grid LLC", "plant state": "CA", "plant id": "67229", "generator id": "HGLPT", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67229", "date": "2026-11", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "go_live": "0 ~ 2026-11", "go_live_year_int": 2026, "name": "Trestles Grid LLC", "name_short": "Trestles Grid", "owner": "Trestles Grid LLC", "state": "california", "country": "usa", "lat": "40.952677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.952677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "city": "", "id": "184", "external_id": "62892", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "EDPR CA Solar Park VI LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "184", "external_id": "62892", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "external_id": "62892", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "EDPR CA Solar Park VI LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SONR2": {"first": {"year": "2022", "month": "12", "entity id": "62760", "entity name": "EDPR CA Solar Park VI LLC", "plant producer type": "IPP", "plant name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "plant state": "CA", "plant id": "62892", "generator id": "SONR2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62892", "date": "2022-12", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-12", "to": "2023-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-12", "to": "2026-10", "extra": "delayed by 22 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "10", "entity id": "62760", "entity name": "EDPR CA Solar Park VI LLC", "plant producer type": "IPP", "plant name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "plant state": "CA", "plant id": "62892", "generator id": "SONR2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62892", "date": "2026-10", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "month_disappeared": "", "go_live": "0 ~ 2026-10", "go_live_year_int": 2026, "name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "name_short": "EDPR CA Solar Park VI LLC (CA)", "owner": "EDPR CA Solar Park VI LLC", "state": "california", "country": "usa", "lat": "41.3585390160412", "long": "-121.22341278539501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.3585390160412+-121.22341278539501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holly Branch Solar, LLC", "city": "", "id": "1033", "external_id": "66692", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Holly Branch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1033", "external_id": "66692", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Holly Branch Solar, LLC", "external_id": "66692", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Holly Branch Solar, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HOLY": {"first": {"year": "2026", "month": "10", "entity id": "65698", "entity name": "Holly Branch Solar, LLC", "plant producer type": "IPP", "plant name": "Holly Branch Solar, LLC", "plant state": "TX", "plant id": "66692", "generator id": "HOLY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66692", "date": "2026-10", "mw": 100}, "first_month": "2023-07", "changes": [], "current": {"year": "2026", "month": "10", "entity id": "65698", "entity name": "Holly Branch Solar, LLC", "plant producer type": "IPP", "plant name": "Holly Branch Solar, LLC", "plant state": "TX", "plant id": "66692", "generator id": "HOLY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66692", "date": "2026-10", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "month_disappeared": "", "go_live": "0 ~ 2026-10", "go_live_year_int": 2026, "name": "Holly Branch Solar, LLC", "name_short": "Holly Branch Solar", "owner": "Holly Branch Solar, LLC", "state": "texas", "country": "usa", "lat": "33.35211785870876", "long": "-95.34749894178886", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.35211785870876+-95.34749894178886", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Second Division Solar", "city": "", "id": "1190", "external_id": "65981", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1190", "external_id": "65981", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Second Division Solar", "external_id": "65981", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Lightsource Renewable Energy Asset Management, LLC", "status": "planning", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TXSD2": {"first": {"year": "2025", "month": "3", "entity id": "62842", "entity name": "Lightsource Renewable Energy Asset Management, LLC", "plant producer type": "IPP", "plant name": "Second Division Solar", "plant state": "TX", "plant id": "65981", "generator id": "TXSD2", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65981", "date": "2025-03", "mw": 30}, "first_month": "2023-12", "changes": [{"month": "2024-05", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-03", "to": "2026-09", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "9", "entity id": "62842", "entity name": "Lightsource Renewable Energy Asset Management, LLC", "plant producer type": "IPP", "plant name": "Second Division Solar", "plant state": "TX", "plant id": "65981", "generator id": "TXSD2", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65981", "date": "2026-09", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "go_live": "0 ~ 2026-09", "go_live_year_int": 2026, "name": "Second Division Solar", "name_short": "Second Division Solar", "owner": "Lightsource Renewable Energy Asset Management, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.453438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.453438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Starr Solar Ranch", "city": "", "id": "1191", "external_id": "65975", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1191", "external_id": "65975", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Starr Solar Ranch", "external_id": "65975", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 360, "power_mw": 180, "owner": "Lightsource Renewable Energy Asset Management, LLC", "status": "planning", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TXSD2": {"first": {"year": "2025", "month": "3", "entity id": "62842", "entity name": "Lightsource Renewable Energy Asset Management, LLC", "plant producer type": "IPP", "plant name": "Starr Solar Ranch", "plant state": "TX", "plant id": "65975", "generator id": "TXSD2", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65975", "date": "2025-03", "mw": 30}, "first_month": "2023-12", "changes": [{"month": "2024-03", "li": [{"name": "mw", "from": 30, "to": 180, "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-03", "to": "2026-09", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "9", "entity id": "62842", "entity name": "Lightsource Renewable Energy Asset Management, LLC", "plant producer type": "IPP", "plant name": "Starr Solar Ranch", "plant state": "TX", "plant id": "65975", "generator id": "TXSD2", "net summer capacity (mw)": "180", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65975", "date": "2026-09", "mw": 180}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 180, "mwh_is_estimate": true, "mwh": 360, "mwh_estimate": 360, "status": "planning", "status_class": "", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "go_live": "0 ~ 2026-09", "go_live_year_int": 2026, "name": "Starr Solar Ranch", "name_short": "Starr Solar Ranch", "owner": "Lightsource Renewable Energy Asset Management, LLC", "state": "texas", "country": "usa", "lat": "33.39163256713626", "long": "-95.46555141629162", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.39163256713626+-95.46555141629162", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wetzel BESS", "city": "", "id": "1362", "external_id": "67555", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1362", "external_id": "67555", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wetzel BESS", "external_id": "67555", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "RIC Development, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RIC98": {"first": {"year": "2026", "month": "9", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Wetzel BESS", "plant state": "TX", "plant id": "67555", "generator id": "RIC98", "net summer capacity (mw)": "185.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67555", "date": "2026-09", "mw": 185}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "9", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Wetzel BESS", "plant state": "TX", "plant id": "67555", "generator id": "RIC98", "net summer capacity (mw)": "185.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67555", "date": "2026-09", "mw": 185}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": true, "mwh": 370, "mwh_estimate": 370, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "go_live": "0 ~ 2026-09", "go_live_year_int": 2026, "name": "Wetzel BESS", "name_short": "Wetzel", "owner": "RIC Development, LLC", "state": "texas", "country": "usa", "lat": "33.550450781375964", "long": "-95.1407592129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.550450781375964+-95.1407592129225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "JVR Energy Park LLC", "city": "", "id": "174", "external_id": "64428", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "JVR Energy Park LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "174", "external_id": "64428", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "JVR Energy Park LLC", "external_id": "64428", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "JVR Energy Park LLC", "status": "planning", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"JVR1B": {"first": {"year": "2022", "month": "12", "entity id": "64077", "entity name": "JVR Energy Park LLC", "plant producer type": "IPP", "plant name": "JVR Energy Park LLC", "plant state": "CA", "plant id": "64428", "generator id": "JVR1B", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64428", "date": "2022-12", "mw": 70}, "first_month": "2021-03", "changes": [{"month": "2022-10", "li": [{"name": "date", "from": "2022-12", "to": "2023-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-09", "to": "2026-08", "extra": "delayed by 35 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}]}], "current": {"year": "2026", "month": "8", "entity id": "64077", "entity name": "JVR Energy Park LLC", "plant producer type": "IPP", "plant name": "JVR Energy Park LLC", "plant state": "CA", "plant id": "64428", "generator id": "JVR1B", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64428", "date": "2026-08", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-08", "month_disappeared": "", "go_live": "0 ~ 2026-08", "go_live_year_int": 2026, "name": "JVR Energy Park LLC", "name_short": "JVR Energy Park", "owner": "JVR Energy Park LLC", "state": "california", "country": "usa", "lat": "40.90583611428471", "long": "-121.37050487471748", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.90583611428471+-121.37050487471748", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "OCI Hillsboro", "city": "", "id": "984", "external_id": "66401", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "984", "external_id": "66401", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "OCI Hillsboro", "external_id": "66401", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "OCI Solar Power", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OHLBS": {"first": {"year": "2026", "month": "7", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "OCI Hillsboro", "plant state": "TX", "plant id": "66401", "generator id": "OHLBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66401", "date": "2026-07", "mw": 200}, "first_month": "2023-04", "changes": [], "current": {"year": "2026", "month": "7", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "OCI Hillsboro", "plant state": "TX", "plant id": "66401", "generator id": "OHLBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66401", "date": "2026-07", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-07", "month_disappeared": "", "go_live": "0 ~ 2026-07", "go_live_year_int": 2026, "name": "OCI Hillsboro", "name_short": "OCI Hillsboro", "owner": "OCI Solar Power", "state": "texas", "country": "usa", "lat": "33.689916016041195", "long": "-95.19680178539501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.689916016041195+-95.19680178539501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Swiftsure", "city": "Staten Island", "id": "128", "external_id": "64235", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "650", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.602891", "long": "-74.178441", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, "internal_id": "128", "external_id": "64235", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Swiftsure", "external_id": "64235", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 1300, "power_mw": 650, "owner": "Hecate Grid Swiftsure LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SWFTS": {"first": {"year": "2023", "month": "12", "entity id": "63838", "entity name": "Hecate Grid Swiftsure LLC", "plant producer type": "IPP", "plant name": "Swiftsure", "plant state": "NY", "plant id": "64235", "generator id": "SWFTS", "net summer capacity (mw)": "650", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64235", "date": "2023-12", "mw": 650}, "first_month": "2021-01", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-12", "to": "2025-12", "extra": "delayed by 24 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-12", "to": "2026-06", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "6", "entity id": "63838", "entity name": "Hecate Grid Swiftsure LLC", "plant producer type": "IPP", "plant name": "Swiftsure", "plant state": "NY", "plant id": "64235", "generator id": "SWFTS", "net summer capacity (mw)": "650", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64235", "date": "2026-06", "mw": 650}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 650, "mwh_is_estimate": true, "mwh": 1300, "mwh_estimate": 1300, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Swiftsure", "name_short": "Swiftsure", "owner": "Hecate Grid Swiftsure LLC", "state": "new york", "country": "usa", "lat": "40.602891", "long": "-74.178441", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.602891+-74.178441", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rockmont Solar and Storage Project", "city": "", "id": "225", "external_id": "64216", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "201LC 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "225", "external_id": "64216", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rockmont Solar and Storage Project", "external_id": "64216", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "201LC 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"309SJ": {"first": {"year": "2022", "month": "6", "entity id": "63826", "entity name": "201LC 8me LLC", "plant producer type": "IPP", "plant name": "Rockmont Solar and Storage Project", "plant state": "NM", "plant id": "64216", "generator id": "309SJ", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64216", "date": "2022-06", "mw": 200}, "first_month": "2021-01", "changes": [{"month": "2021-08", "li": [{"name": "mw", "from": 200, "to": 30, "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-06", "to": "2023-06", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2023-06", "to": "2024-04", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-04", "to": "2026-06", "extra": "delayed by 26 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "6", "entity id": "63826", "entity name": "201LC 8me LLC", "plant producer type": "IPP", "plant name": "Rockmont Solar and Storage Project", "plant state": "NM", "plant id": "64216", "generator id": "309SJ", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64216", "date": "2026-06", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Rockmont Solar and Storage Project", "name_short": "Rockmont Solar and Storage", "owner": "201LC 8me LLC", "state": "new mexico", "country": "usa", "lat": "36.599861", "long": "-103.677979", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.599861+-103.677979", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Homestead Energy Storage LLC", "city": "", "id": "623", "external_id": "65398", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "Homestead Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "623", "external_id": "65398", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Homestead Energy Storage LLC", "external_id": "65398", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 28, "power_mw": 14, "owner": "Homestead Energy Storage, LLC", "status": "planning", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HMSD1": {"first": {"year": "2024", "month": "2", "entity id": "64741", "entity name": "Homestead Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Homestead Energy Storage LLC", "plant state": "CA", "plant id": "65398", "generator id": "HMSD1", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65398", "date": "2024-02", "mw": 14}, "first_month": "2022-03", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-02", "to": "2026-06", "extra": "delayed by 28 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "6", "entity id": "64741", "entity name": "Homestead Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Homestead Energy Storage LLC", "plant state": "CA", "plant id": "65398", "generator id": "HMSD1", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65398", "date": "2026-06", "mw": 14}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 14, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "planning", "status_class": "", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Homestead Energy Storage LLC", "name_short": "Homestead Energy Storage", "owner": "Homestead Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.208432801403745", "long": "-121.237743763257", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.208432801403745+-121.237743763257", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eldora Energy LLC", "city": "", "id": "795", "external_id": "65847", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Eldora Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "795", "external_id": "65847", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eldora Energy LLC", "external_id": "65847", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Eldora Energy LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELDBS": {"first": {"year": "2025", "month": "6", "entity id": "65084", "entity name": "Eldora Energy LLC", "plant producer type": "IPP", "plant name": "Eldora Energy LLC", "plant state": "TX", "plant id": "65847", "generator id": "ELDBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65847", "date": "2025-06", "mw": 200}, "first_month": "2022-09", "changes": [{"month": "2024-03", "li": [{"name": "date", "from": "2025-06", "to": "2026-06", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "6", "entity id": "65084", "entity name": "Eldora Energy LLC", "plant producer type": "IPP", "plant name": "Eldora Energy LLC", "plant state": "TX", "plant id": "65847", "generator id": "ELDBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65847", "date": "2026-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Eldora Energy LLC", "name_short": "Eldora Energy", "owner": "Eldora Energy LLC", "state": "texas", "country": "usa", "lat": "33.164054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.164054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Grid Gwent Storage 1", "city": "", "id": "954", "external_id": "66409", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "Hecate Grid Gwent Storage 1, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "954", "external_id": "66409", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Grid Gwent Storage 1", "external_id": "66409", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 270, "power_mw": 135, "owner": "Hecate Grid Gwent Storage 1, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GWNT": {"first": {"year": "2026", "month": "6", "entity id": "65481", "entity name": "Hecate Grid Gwent Storage 1, LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Gwent Storage 1", "plant state": "CA", "plant id": "66409", "generator id": "GWNT", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66409", "date": "2026-06", "mw": 135}, "first_month": "2023-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "65481", "entity name": "Hecate Grid Gwent Storage 1, LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Gwent Storage 1", "plant state": "CA", "plant id": "66409", "generator id": "GWNT", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66409", "date": "2026-06", "mw": 135}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 135, "mwh_is_estimate": true, "mwh": 270, "mwh_estimate": 270, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Hecate Grid Gwent Storage 1", "name_short": "Hecate Grid Gwent Storage 1", "owner": "Hecate Grid Gwent Storage 1, LLC", "state": "california", "country": "usa", "lat": "40.94387837493652", "long": "-121.3581441949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94387837493652+-121.3581441949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elevate Pier S", "city": "", "id": "1038", "external_id": "66787", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Pier S Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1038", "external_id": "66787", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elevate Pier S", "external_id": "66787", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Pier S Energy Storage LLC", "status": "planning", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELVPS": {"first": {"year": "2026", "month": "6", "entity id": "65764", "entity name": "Pier S Energy Storage LLC", "plant producer type": "IPP", "plant name": "Elevate Pier S", "plant state": "CA", "plant id": "66787", "generator id": "ELVPS", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66787", "date": "2026-06", "mw": 70}, "first_month": "2023-08", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "65764", "entity name": "Pier S Energy Storage LLC", "plant producer type": "IPP", "plant name": "Elevate Pier S", "plant state": "CA", "plant id": "66787", "generator id": "ELVPS", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66787", "date": "2026-06", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Elevate Pier S", "name_short": "Elevate Pier S", "owner": "Pier S Energy Storage LLC", "state": "california", "country": "usa", "lat": "40.98395968045898", "long": "-121.10912098932751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98395968045898+-121.10912098932751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lupinus Solar 1, LLC", "city": "", "id": "1060", "external_id": "66895", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "166", "power_mw": "83", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1060", "external_id": "66895", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lupinus Solar 1, LLC", "external_id": "66895", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 166, "power_mw": 83, "owner": "Sunraycer Assets I LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LP1BA": {"first": {"year": "2026", "month": "6", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Lupinus Solar 1, LLC", "plant state": "TX", "plant id": "66895", "generator id": "LP1BA", "net summer capacity (mw)": "83", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66895", "date": "2026-06", "mw": 83}, "first_month": "2023-09", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Lupinus Solar 1, LLC", "plant state": "TX", "plant id": "66895", "generator id": "LP1BA", "net summer capacity (mw)": "83", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66895", "date": "2026-06", "mw": 83}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 83, "mwh_is_estimate": true, "mwh": 166, "mwh_estimate": 166, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Lupinus Solar 1, LLC", "name_short": "Lupinus Solar 1", "owner": "Sunraycer Assets I LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.153438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.153438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Big Fork Solar", "city": "", "id": "1352", "external_id": "62184", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "148", "power_mw": "74", "customer": "", "owner": "Big Fork Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1352", "external_id": "62184", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Big Fork Solar", "external_id": "62184", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 148, "power_mw": 74, "owner": "Big Fork Solar", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"27": {"first": {"year": "2026", "month": "6", "entity id": "61716", "entity name": "Big Fork Solar", "plant producer type": "IPP", "plant name": "Big Fork Solar", "plant state": "SC", "plant id": "62184", "generator id": "27", "net summer capacity (mw)": "74.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62184", "date": "2026-06", "mw": 74}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "61716", "entity name": "Big Fork Solar", "plant producer type": "IPP", "plant name": "Big Fork Solar", "plant state": "SC", "plant id": "62184", "generator id": "27", "net summer capacity (mw)": "74.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62184", "date": "2026-06", "mw": 74}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 74, "mwh_is_estimate": true, "mwh": 148, "mwh_estimate": 148, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Big Fork Solar", "name_short": "Big Fork Solar", "owner": "Big Fork Solar", "state": "south carolina", "country": "usa", "lat": "34.522118923669886", "long": "-79.90876444719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.522118923669886+-79.90876444719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Colleton Solar", "city": "", "id": "1353", "external_id": "62188", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "148", "power_mw": "74", "customer": "", "owner": "Colleton Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1353", "external_id": "62188", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Colleton Solar", "external_id": "62188", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 148, "power_mw": 74, "owner": "Colleton Solar", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"31": {"first": {"year": "2026", "month": "6", "entity id": "61720", "entity name": "Colleton Solar", "plant producer type": "IPP", "plant name": "Colleton Solar", "plant state": "SC", "plant id": "62188", "generator id": "31", "net summer capacity (mw)": "74.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62188", "date": "2026-06", "mw": 74}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "61720", "entity name": "Colleton Solar", "plant producer type": "IPP", "plant name": "Colleton Solar", "plant state": "SC", "plant id": "62188", "generator id": "31", "net summer capacity (mw)": "74.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62188", "date": "2026-06", "mw": 74}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 74, "mwh_is_estimate": true, "mwh": 148, "mwh_estimate": 148, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Colleton Solar", "name_short": "Colleton Solar", "owner": "Colleton Solar", "state": "south carolina", "country": "usa", "lat": "34.47246317893376", "long": "-79.88983835188054", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.47246317893376+-79.88983835188054", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crossroads Solar", "city": "", "id": "1354", "external_id": "62190", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Crossroads Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1354", "external_id": "62190", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Crossroads Solar", "external_id": "62190", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Crossroads Solar", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"33": {"first": {"year": "2026", "month": "6", "entity id": "61722", "entity name": "Crossroads Solar", "plant producer type": "IPP", "plant name": "Crossroads Solar", "plant state": "SC", "plant id": "62190", "generator id": "33", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62190", "date": "2026-06", "mw": 50}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "61722", "entity name": "Crossroads Solar", "plant producer type": "IPP", "plant name": "Crossroads Solar", "plant state": "SC", "plant id": "62190", "generator id": "33", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62190", "date": "2026-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Crossroads Solar", "name_short": "Crossroads Solar", "owner": "Crossroads Solar", "state": "south carolina", "country": "usa", "lat": "34.427961374936515", "long": "-79.8503611949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.427961374936515+-79.8503611949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Quest Solar", "city": "", "id": "1355", "external_id": "62299", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Quest Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1355", "external_id": "62299", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Quest Solar", "external_id": "62299", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Quest Solar", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"67": {"first": {"year": "2026", "month": "6", "entity id": "61807", "entity name": "Quest Solar", "plant producer type": "IPP", "plant name": "Quest Solar", "plant state": "SC", "plant id": "62299", "generator id": "67", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62299", "date": "2026-06", "mw": 50}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "61807", "entity name": "Quest Solar", "plant producer type": "IPP", "plant name": "Quest Solar", "plant state": "SC", "plant id": "62299", "generator id": "67", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62299", "date": "2026-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Quest Solar", "name_short": "Quest Solar", "owner": "Quest Solar", "state": "south carolina", "country": "usa", "lat": "34.39676", "long": "-79.792266", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.39676+-79.792266", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alina Energy LLC", "city": "", "id": "1358", "external_id": "67250", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Alina Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1358", "external_id": "67250", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alina Energy LLC", "external_id": "67250", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Alina Energy LLC", "status": "planning", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ALIBS": {"first": {"year": "2026", "month": "6", "entity id": "66122", "entity name": "Alina Energy LLC", "plant producer type": "IPP", "plant name": "Alina Energy LLC", "plant state": "TX", "plant id": "67250", "generator id": "ALIBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67250", "date": "2026-06", "mw": 200}, "first_month": "2024-03", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "66122", "entity name": "Alina Energy LLC", "plant producer type": "IPP", "plant name": "Alina Energy LLC", "plant state": "TX", "plant id": "67250", "generator id": "ALIBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67250", "date": "2026-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Alina Energy LLC", "name_short": "Alina Energy", "owner": "Alina Energy LLC", "state": "texas", "country": "usa", "lat": "33.291825270367276", "long": "-95.05014930955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.291825270367276+-95.05014930955251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elm Flats Solar", "city": "", "id": "1369", "external_id": "67552", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Birch Creek Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1369", "external_id": "67552", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elm Flats Solar", "external_id": "67552", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Birch Creek Development", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELMBA": {"first": {"year": "2026", "month": "6", "entity id": "65654", "entity name": "Birch Creek Development", "plant producer type": "IPP", "plant name": "Elm Flats Solar", "plant state": "TX", "plant id": "67552", "generator id": "ELMBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67552", "date": "2026-06", "mw": 50}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "65654", "entity name": "Birch Creek Development", "plant producer type": "IPP", "plant name": "Elm Flats Solar", "plant state": "TX", "plant id": "67552", "generator id": "ELMBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67552", "date": "2026-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Elm Flats Solar", "name_short": "Elm Flats Solar", "owner": "Birch Creek Development", "state": "texas", "country": "usa", "lat": "33.552321404211234", "long": "-95.57587397218185", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.552321404211234+-95.57587397218185", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cedar Hill ESS", "city": "", "id": "1370", "external_id": "67570", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Cedar Hill ESS Assets, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1370", "external_id": "67570", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cedar Hill ESS", "external_id": "67570", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Cedar Hill ESS Assets, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"3004": {"first": {"year": "2026", "month": "6", "entity id": "66272", "entity name": "Cedar Hill ESS Assets, LLC", "plant producer type": "IPP", "plant name": "Cedar Hill ESS", "plant state": "TX", "plant id": "67570", "generator id": "3004", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67570", "date": "2026-06", "mw": 10}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "66272", "entity name": "Cedar Hill ESS Assets, LLC", "plant producer type": "IPP", "plant name": "Cedar Hill ESS", "plant state": "TX", "plant id": "67570", "generator id": "3004", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67570", "date": "2026-06", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Cedar Hill ESS", "name_short": "Cedar Hill ESS", "owner": "Cedar Hill ESS Assets, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.413438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.413438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alfred Oaks Solar, LLC", "city": "", "id": "1026", "external_id": "66675", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Alfred Oaks Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1026", "external_id": "66675", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alfred Oaks Solar, LLC", "external_id": "66675", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Alfred Oaks Solar, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2026", "month": "5", "entity id": "65689", "entity name": "Alfred Oaks Solar, LLC", "plant producer type": "IPP", "plant name": "Alfred Oaks Solar, LLC", "plant state": "NY", "plant id": "66675", "generator id": "BA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66675", "date": "2026-05", "mw": 20}, "first_month": "2023-07", "changes": [], "current": {"year": "2026", "month": "5", "entity id": "65689", "entity name": "Alfred Oaks Solar, LLC", "plant producer type": "IPP", "plant name": "Alfred Oaks Solar, LLC", "plant state": "NY", "plant id": "66675", "generator id": "BA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66675", "date": "2026-05", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "month_disappeared": "", "go_live": "0 ~ 2026-05", "go_live_year_int": 2026, "name": "Alfred Oaks Solar, LLC", "name_short": "Alfred Oaks Solar", "owner": "Alfred Oaks Solar, LLC", "state": "new york", "country": "usa", "lat": "42.815588720802765", "long": "-75.55669092303249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.815588720802765+-75.55669092303249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Green River Energy Center - Hybrid", "city": "", "id": "1371", "external_id": "67501", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Green River Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1371", "external_id": "67501", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Green River Energy Center - Hybrid", "external_id": "67501", "state": "utah", "country": "usa", "mwh": 0, "estimate_mwh": 800, "power_mw": 400, "owner": "Green River Energy Center, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GRBS": {"first": {"year": "2026", "month": "5", "entity id": "66232", "entity name": "Green River Energy Center, LLC", "plant producer type": "IPP", "plant name": "Green River Energy Center - Hybrid", "plant state": "UT", "plant id": "67501", "generator id": "GRBS", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67501", "date": "2026-05", "mw": 400}, "first_month": "2024-05", "changes": [], "current": {"year": "2026", "month": "5", "entity id": "66232", "entity name": "Green River Energy Center, LLC", "plant producer type": "IPP", "plant name": "Green River Energy Center - Hybrid", "plant state": "UT", "plant id": "67501", "generator id": "GRBS", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67501", "date": "2026-05", "mw": 400}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 400, "mwh_is_estimate": true, "mwh": 800, "mwh_estimate": 800, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "month_disappeared": "", "go_live": "0 ~ 2026-05", "go_live_year_int": 2026, "name": "Green River Energy Center - Hybrid", "name_short": "Green River Energy Center", "owner": "Green River Energy Center, LLC", "state": "utah", "country": "usa", "lat": "40.646842246911255", "long": "-109.85196215563981", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.646842246911255+-109.85196215563981", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wolf Pit Branch Solar, LLC", "city": "", "id": "626", "external_id": "65437", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Wolf Pit Branch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "626", "external_id": "65437", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wolf Pit Branch Solar, LLC", "external_id": "65437", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Wolf Pit Branch Solar, LLC", "status": "planning", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PGB38": {"first": {"year": "2023", "month": "11", "entity id": "64776", "entity name": "Wolf Pit Branch Solar, LLC", "plant producer type": "IPP", "plant name": "Wolf Pit Branch Solar, LLC", "plant state": "SC", "plant id": "65437", "generator id": "PGB38", "net summer capacity (mw)": "15.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65437", "date": "2023-11", "mw": 15}, "first_month": "2022-03", "changes": [{"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-11", "to": "2026-04", "extra": "delayed by 29 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "4", "entity id": "64776", "entity name": "Wolf Pit Branch Solar, LLC", "plant producer type": "IPP", "plant name": "Wolf Pit Branch Solar, LLC", "plant state": "SC", "plant id": "65437", "generator id": "PGB38", "net summer capacity (mw)": "15.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65437", "date": "2026-04", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-04", "month_disappeared": "", "go_live": "0 ~ 2026-04", "go_live_year_int": 2026, "name": "Wolf Pit Branch Solar, LLC", "name_short": "Wolf Pit Branch Solar", "owner": "Wolf Pit Branch Solar, LLC", "state": "south carolina", "country": "usa", "lat": "34.77034172080277", "long": "-79.84541692303249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.77034172080277+-79.84541692303249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "NISA Electric Generation Project", "city": "", "id": "233", "external_id": "61331", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "NYC ENERGY LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "233", "external_id": "61331", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "NISA Electric Generation Project", "external_id": "61331", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 598, "power_mw": 299, "owner": "NYC Energy LLC", "status": "planning", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BA1": {"first": {"year": "2023", "month": "11", "entity id": "60971", "entity name": "NYC ENERGY LLC", "plant producer type": "IPP", "plant name": "NISA Electric Generation Project", "plant state": "NY", "plant id": "61331", "generator id": "BA1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61331", "date": "2023-11", "mw": 300}, "first_month": "2021-03", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-11", "to": "2024-03", "extra": "delayed by 4 months", "change_type": "timing"}, {"name": "mw", "from": 300, "to": 79, "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "entity name", "from": "NYC ENERGY LLC", "to": "NYC Energy LLC", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2026-03", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "3", "entity id": "60971", "entity name": "NYC Energy LLC", "plant producer type": "IPP", "plant name": "NISA Electric Generation Project", "plant state": "NY", "plant id": "61331", "generator id": "BA1", "net summer capacity (mw)": "79.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61331", "date": "2026-03", "mw": 79}, "current_month": "2024-06", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}, "BA2": {"first": {"year": "2025", "month": "7", "entity id": "60971", "entity name": "NYC ENERGY LLC", "plant producer type": "IPP", "plant name": "NISA Electric Generation Project", "plant state": "NY", "plant id": "61331", "generator id": "BA2", "net summer capacity (mw)": "220.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61331", "date": "2025-07", "mw": 220}, "first_month": "2022-03", "changes": [{"month": "2023-05", "li": [{"name": "entity name", "from": "NYC ENERGY LLC", "to": "NYC Energy LLC", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-07", "to": "2026-03", "extra": "delayed by 8 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "3", "entity id": "60971", "entity name": "NYC Energy LLC", "plant producer type": "IPP", "plant name": "NISA Electric Generation Project", "plant state": "NY", "plant id": "61331", "generator id": "BA2", "net summer capacity (mw)": "220.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61331", "date": "2026-03", "mw": 220}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 299, "mwh_is_estimate": true, "mwh": 598, "mwh_estimate": 598, "status": "planning", "status_class": "", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "go_live": "0 ~ 2026-03", "go_live_year_int": 2026, "name": "NISA Electric Generation Project", "name_short": "NISA Electric Generation", "owner": "NYC Energy LLC", "state": "new york", "country": "usa", "lat": "42.55007085870876", "long": "-75.57760094178886", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.55007085870876+-75.57760094178886", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KCE NY 10, LLC", "city": "", "id": "1025", "external_id": "66682", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1025", "external_id": "66682", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KCE NY 10, LLC", "external_id": "66682", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NY10": {"first": {"year": "2025", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE NY 10, LLC", "plant state": "NY", "plant id": "66682", "generator id": "NY10", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66682", "date": "2025-12", "mw": 20}, "first_month": "2023-07", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2025-12", "to": "2026-03", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "3", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE NY 10, LLC", "plant state": "NY", "plant id": "66682", "generator id": "NY10", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66682", "date": "2026-03", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "go_live": "0 ~ 2026-03", "go_live_year_int": 2026, "name": "KCE NY 10, LLC", "name_short": "KCE NY 10", "owner": "Key Capture Energy", "state": "new york", "country": "usa", "lat": "42.802006999999996", "long": "-75.50354", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.802006999999996+-75.50354", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KCE NY 29, LLC", "city": "", "id": "1051", "external_id": "66862", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1051", "external_id": "66862", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KCE NY 29, LLC", "external_id": "66862", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NY29": {"first": {"year": "2025", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE NY 29, LLC", "plant state": "NY", "plant id": "66862", "generator id": "NY29", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66862", "date": "2025-12", "mw": 150}, "first_month": "2023-09", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2025-12", "to": "2026-03", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "3", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE NY 29, LLC", "plant state": "NY", "plant id": "66862", "generator id": "NY29", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66862", "date": "2026-03", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "go_live": "0 ~ 2026-03", "go_live_year_int": 2026, "name": "KCE NY 29, LLC", "name_short": "KCE NY 29", "owner": "Key Capture Energy", "state": "new york", "country": "usa", "lat": "42.614306926686254", "long": "-75.619568894988", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.614306926686254+-75.619568894988", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middlebrook Creek Solar and BESS", "city": "", "id": "790", "external_id": "65853", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "604", "power_mw": "302", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.598849", "long": "-94.598401", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, "internal_id": "790", "external_id": "65853", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Middlebrook Creek Solar and BESS", "external_id": "65853", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 604, "power_mw": 302, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-02", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MIDBS": {"first": {"year": "2024", "month": "10", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Middlebrook Creek Solar and BESS", "plant state": "TX", "plant id": "65853", "generator id": "MIDBS", "net summer capacity (mw)": "302.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65853", "date": "2024-10", "mw": 302}, "first_month": "2022-09", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-10", "to": "2026-02", "extra": "delayed by 16 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "2", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Middlebrook Creek Solar and BESS", "plant state": "TX", "plant id": "65853", "generator id": "MIDBS", "net summer capacity (mw)": "302.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65853", "date": "2026-02", "mw": 302}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 302, "mwh_is_estimate": true, "mwh": 604, "mwh_estimate": 604, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-02", "month_disappeared": "", "go_live": "0 ~ 2026-02", "go_live_year_int": 2026, "name": "Middlebrook Creek Solar and BESS", "name_short": "Middlebrook Creek Solar", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "31.598849", "long": "-94.598401", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.598849+-94.598401", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarproponent.com/projects/#"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KCE TX 14: Venus Mill Storage", "city": "", "id": "797", "external_id": "65788", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "797", "external_id": "65788", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX 14 Venus Mill Storage", "external_id": "65788", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX14": {"first": {"year": "2024", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE TX 14: Venus Mill Storage", "plant state": "TX", "plant id": "65788", "generator id": "TX14", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65788", "date": "2024-07", "mw": 100}, "first_month": "2022-09", "changes": [{"month": "2023-07", "li": [{"name": "plant name", "from": "KCE TX 14: Venus Mill Storage", "to": "TX 14 Venus Mill Storage", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-07", "to": "2025-12", "extra": "delayed by 17 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2025-12", "to": "2026-01", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2026", "month": "1", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX 14 Venus Mill Storage", "plant state": "TX", "plant id": "65788", "generator id": "TX14", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65788", "date": "2026-01", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-01", "month_disappeared": "", "go_live": "0 ~ 2026-01", "go_live_year_int": 2026, "name": "TX 14 Venus Mill Storage", "name_short": "TX 14 Venus Mill", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.183842323878764", "long": "-95.07711772573431", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.183842323878764+-95.07711772573431", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Marsh Road - Battery Energy Storage System", "city": "", "id": "604", "external_id": "10173", "state": "east midlands", "country": "uk", "capacity_mwh": "1100", "estimate_mwh": "", "power_mw": "550", "customer": "", "owner": "Spalding Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-28", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.great.gov.uk/international/content/investment/opportunities/spalding-battery-energy-storage-system-in-lincolnshire/", "link2": "", "link3": "", "link4": ""}, "internal_id": "604", "external_id": "10173", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Spalding Energy Park - Battery Storage", "external_id": "10173", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 550, "power_mw": 550, "owner": "Intergen Limited", "status": "planning", "date_first_heard": "2023-06-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.803869", "long": "-0.135314", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10173", "Record Last Updated (dd/mm/yyyy)": "28/12/2021", "Operator (or Applicant)": "Spalding Energy Park Limited", "Site Name": "West Marsh Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "550.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Spalding Power Station West Marsh Road Spalding", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE11 2BB", "X-coordinate": "525801", "Y-coordinate": "324553", "Planning Authority": "South Holland District Council", "Planning Application Reference": "H16-1327-21", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.803869", "long": "-0.135314", "status": "planning", "mw": 550, "ext_id": "10173"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Operator (or Applicant)", "from": "Spalding Energy Park Limited", "to": "Intergen Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "West Marsh Road - Battery Energy Storage System", "to": "Spalding Energy Park - Battery Storage", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/12/2021", "to": "12/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "14/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "14/06/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/07/2023", "to": "28/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10173", "Record Last Updated (dd/mm/yyyy)": "28/12/2021", "Operator (or Applicant)": "Intergen Limited", "Site Name": "Spalding Energy Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "550", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Spalding Power Station West Marsh Road Spalding", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE11 2BB", "X-coordinate": "525801", "Y-coordinate": "324553", "Planning Authority": "South Holland District Council", "Planning Application Reference": "H16-1327-21", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/06/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.803869", "long": "-0.135314", "status": "planning", "mw": 550, "ext_id": "10173"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 550, "mwh_is_estimate": false, "mwh": 1100, "mwh_estimate": 550, "status": "planning", "status_class": "", "date_first_heard": "2023-06-14", "start_construction": "", "start_operation": "", "start_estimated": "2026", "month_disappeared": "", "go_live": "0 ~ 2026", "go_live_year_int": 2026, "name": "Spalding Energy Park - Battery Storage", "name_short": "Spalding Energy Park", "owner": "Intergen Limited", "state": "east midlands", "country": "uk", "lat": "52.803869", "long": "-0.135314", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.803869+-0.135314", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.great.gov.uk/international/content/investment/opportunities/spalding-battery-energy-storage-system-in-lincolnshire/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Orana BESS", "city": "wellington", "id": "1395", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1660", "estimate_mwh": "", "power_mw": "415", "customer": "EnergyAustralia", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "650", "cost_currency": "AUD", "cost_incl_solar": "0", "lat": "-32.527608", "long": "148.958942", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1812687836887281794", "link2": "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million", "link3": "", "link4": ""}, "internal_id": "1395", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 415, "mwh_is_estimate": false, "mwh": 1660, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "month_disappeared": "", "go_live": "0 ~ 2026", "go_live_year_int": 2026, "name": "Orana BESS", "name_short": "Orana", "owner": "Akaysha Energy", "state": "new south wales", "country": "australia", "lat": "-32.527608", "long": "148.958942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-32.527608+148.958942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://x.com/SawyerMerritt/status/1812687836887281794", "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Collie Battery Stage 2", "city": "", "id": "1394", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "1363", "estimate_mwh": "", "power_mw": "341", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31", "long": "116.29", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://colliebattery.com.au/2024/05/01/construction-stage2/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1394", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 341, "mwh_is_estimate": false, "mwh": 1363, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "month_disappeared": "", "go_live": "0 ~ 2025Q4", "go_live_year_int": 2025, "name": "Collie Battery Stage 2", "name_short": "Collie Battery Stage 2", "owner": "neoen", "state": "western australia", "country": "australia", "lat": "-33.31", "long": "116.29", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.31+116.29", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 224, "notes_split": [""], "links": ["https://colliebattery.com.au/2024/05/01/construction-stage2/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Limondale", "city": "balranald", "id": "1396", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "RWE", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.774873", "long": "143.526866", "coords_hint": "2", "use_case": "", "notes": "location from the balrnald supstation on google maps", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1795348622864945179", "link2": "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/", "link3": "", "link4": ""}, "internal_id": "1396", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "month_disappeared": "", "go_live": "0 ~ 2025Q4", "go_live_year_int": 2025, "name": "Limondale", "name_short": "Limondale", "owner": "RWE", "state": "new south wales", "country": "australia", "lat": "-34.774873", "long": "143.526866", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.774873+143.526866", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from the balrnald supstation on google maps"], "links": ["https://x.com/SawyerMerritt/status/1795348622864945179", "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Western Downs Battery", "city": "South West Queensland", "id": "850", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "270", "customer": "Neoen Australia", "owner": "Neoen", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-26.976142", "long": "150.666771", "coords_hint": "2", "use_case": "solar farm support", "notes": "", "project_website": "https://westerndownsgreenpowerhub.com.au/", "link1": "https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "link2": "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/", "link3": "", "link4": ""}, "internal_id": "850", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 270, "mwh_is_estimate": false, "mwh": 540, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "month_disappeared": "", "go_live": "0 ~ 2025Q1", "go_live_year_int": 2025, "name": "Western Downs Battery", "name_short": "Western Downs Battery", "owner": "Neoen", "state": "queensland", "country": "australia", "lat": "-26.976142", "long": "150.666771", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-26.976142+150.666771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bellefield Solar and Energy Storage Farm", "city": "", "id": "158", "external_id": "64210", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "50LW 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "158", "external_id": "64210", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bellefield Solar and Energy Storage Farm", "external_id": "64210", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 1000, "power_mw": 500, "owner": "50LW 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"50LWB": {"first": {"year": "2023", "month": "6", "entity id": "63805", "entity name": "50LW 8me LLC", "plant producer type": "IPP", "plant name": "Bellefield Solar and Energy Storage Farm", "plant state": "CA", "plant id": "64210", "generator id": "50LWB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64210", "date": "2023-06", "mw": 500}, "first_month": "2021-01", "changes": [{"month": "2022-02", "li": [{"name": "date", "from": "2023-06", "to": "2024-11", "extra": "delayed by 17 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2024-11", "to": "2025-12", "extra": "delayed by 13 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "63805", "entity name": "50LW 8me LLC", "plant producer type": "IPP", "plant name": "Bellefield Solar and Energy Storage Farm", "plant state": "CA", "plant id": "64210", "generator id": "50LWB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64210", "date": "2025-12", "mw": 500}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 500, "mwh_is_estimate": true, "mwh": 1000, "mwh_estimate": 1000, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Bellefield Solar and Energy Storage Farm", "name_short": "Bellefield Solar and Energy Storage...", "owner": "50LW 8me LLC", "state": "california", "country": "usa", "lat": "40.96044827036728", "long": "-121.07676030955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.96044827036728+-121.07676030955251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Skeleton Creek Energy Center Hybrid", "city": "", "id": "237", "external_id": "62494", "state": "oklahoma", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Skeleton Creek Energy Center", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "237", "external_id": "62494", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Skeleton Creek Energy Center Hybrid", "external_id": "62494", "state": "oklahoma", "country": "usa", "mwh": 0, "estimate_mwh": 504, "power_mw": 252, "owner": "Skeleton Creek Energy Center", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SCBAT": {"first": {"year": "2023", "month": "12", "entity id": "62023", "entity name": "Skeleton Creek Energy Center", "plant producer type": "IPP", "plant name": "Skeleton Creek Energy Center Hybrid", "plant state": "OK", "plant id": "62494", "generator id": "SCBAT", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62494", "date": "2023-12", "mw": 200}, "first_month": "2020-09", "changes": [{"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2025-12", "extra": "delayed by 24 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "mw", "from": 200, "to": 252, "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "12", "entity id": "62023", "entity name": "Skeleton Creek Energy Center", "plant producer type": "IPP", "plant name": "Skeleton Creek Energy Center Hybrid", "plant state": "OK", "plant id": "62494", "generator id": "SCBAT", "net summer capacity (mw)": "252", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62494", "date": "2025-12", "mw": 252}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 252, "mwh_is_estimate": true, "mwh": 504, "mwh_estimate": 504, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Skeleton Creek Energy Center Hybrid", "name_short": "Skeleton Creek Energy Center", "owner": "Skeleton Creek Energy Center", "state": "oklahoma", "country": "usa", "lat": "36.52377636320376", "long": "-95.09821295600942", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.52377636320376+-95.09821295600942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Boulder Solar III LLC", "city": "", "id": "577", "external_id": "65141", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "116", "power_mw": "58", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "577", "external_id": "65141", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Boulder Solar III LLC", "external_id": "65141", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 116, "power_mw": 58, "owner": "174 Power Global Corp.", "status": "planning", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BS3ES": {"first": {"year": "2023", "month": "12", "entity id": "61222", "entity name": "174 Power Global Corp.", "plant producer type": "IPP", "plant name": "Boulder Solar III LLC", "plant state": "NV", "plant id": "65141", "generator id": "BS3ES", "net summer capacity (mw)": "58", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65141", "date": "2023-12", "mw": 58}, "first_month": "2021-12", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2023-12", "to": "2025-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "61222", "entity name": "174 Power Global Corp.", "plant producer type": "IPP", "plant name": "Boulder Solar III LLC", "plant state": "NV", "plant id": "65141", "generator id": "BS3ES", "net summer capacity (mw)": "58", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65141", "date": "2025-12", "mw": 58}, "current_month": "2024-06", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 58, "mwh_is_estimate": true, "mwh": 116, "mwh_estimate": 116, "status": "planning", "status_class": "", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Boulder Solar III LLC", "name_short": "Boulder Solar III", "owner": "174 Power Global Corp.", "state": "nevada", "country": "usa", "lat": "41.30554500365377", "long": "-114.73319713582602", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.30554500365377+-114.73319713582602", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chiquito Grid, LLC", "city": "", "id": "705", "external_id": "65655", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Chiquito Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "705", "external_id": "65655", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Chiquito Grid, LLC", "external_id": "65655", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "Chiquito Grid, LLC", "status": "planning", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HECHQ": {"first": {"year": "2023", "month": "3", "entity id": "64934", "entity name": "Chiquito Grid, LLC", "plant producer type": "IPP", "plant name": "Chiquito Grid, LLC", "plant state": "CA", "plant id": "65655", "generator id": "HECHQ", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65655", "date": "2023-03", "mw": 80}, "first_month": "2022-06", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2023-03", "to": "2023-12", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "64934", "entity name": "Chiquito Grid, LLC", "plant producer type": "IPP", "plant name": "Chiquito Grid, LLC", "plant state": "CA", "plant id": "65655", "generator id": "HECHQ", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65655", "date": "2025-12", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "planning", "status_class": "", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Chiquito Grid, LLC", "name_short": "Chiquito Grid", "owner": "Chiquito Grid, LLC", "state": "california", "country": "usa", "lat": "41.232677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.232677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clear Fork Creek Solar and BESS SLF", "city": "", "id": "784", "external_id": "65842", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1200", "power_mw": "600", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "784", "external_id": "65842", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Clear Fork Creek Solar and BESS SLF", "external_id": "65842", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 1200, "power_mw": 600, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CFCBS": {"first": {"year": "2024", "month": "3", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Clear Fork Creek Solar and BESS SLF", "plant state": "TX", "plant id": "65842", "generator id": "CFCBS", "net summer capacity (mw)": "600", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65842", "date": "2024-03", "mw": 600}, "first_month": "2022-09", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2024-03", "to": "2025-12", "extra": "delayed by 21 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Clear Fork Creek Solar and BESS SLF", "plant state": "TX", "plant id": "65842", "generator id": "CFCBS", "net summer capacity (mw)": "600", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65842", "date": "2025-12", "mw": 600}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 600, "mwh_is_estimate": true, "mwh": 1200, "mwh_estimate": 1200, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Clear Fork Creek Solar and BESS SLF", "name_short": "Clear Fork Creek Solar and BESS SLF", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "33.689916016041195", "long": "-95.19680178539501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.689916016041195+-95.19680178539501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hollow Branch Creek 2 Solar and BESS SLF", "city": "", "id": "786", "external_id": "65851", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "786", "external_id": "65851", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hollow Branch Creek 2 Solar and BESS SLF", "external_id": "65851", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 800, "power_mw": 400, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HB2BS": {"first": {"year": "2024", "month": "10", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Hollow Branch Creek 2 Solar and BESS SLF", "plant state": "TX", "plant id": "65851", "generator id": "HB2BS", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65851", "date": "2024-10", "mw": 400}, "first_month": "2022-09", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-10", "to": "2025-12", "extra": "delayed by 14 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Hollow Branch Creek 2 Solar and BESS SLF", "plant state": "TX", "plant id": "65851", "generator id": "HB2BS", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65851", "date": "2025-12", "mw": 400}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 400, "mwh_is_estimate": true, "mwh": 800, "mwh_estimate": 800, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Hollow Branch Creek 2 Solar and BESS SLF", "name_short": "Hollow Branch Creek 2 Solar and BES...", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "33.73176250275819", "long": "-95.36367096235749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.73176250275819+-95.36367096235749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barilla Solar", "city": "", "id": "943", "external_id": "58710", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "943", "external_id": "58710", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Barilla Solar", "external_id": "58710", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BARBA": {"first": {"year": "2025", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Barilla Solar", "plant state": "TX", "plant id": "58710", "generator id": "BARBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58710", "date": "2025-12", "mw": 20}, "first_month": "2023-02", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Barilla Solar", "plant state": "TX", "plant id": "58710", "generator id": "BARBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58710", "date": "2025-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Barilla Solar", "name_short": "Barilla Solar", "owner": "Leeward Asset Management, LLC", "state": "texas", "country": "usa", "lat": "33.572170481178745", "long": "-95.1876213531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.572170481178745+-95.1876213531653", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Energy Ramsey Storage", "city": "", "id": "978", "external_id": "66414", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "Hecate Energy Ramsey Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "978", "external_id": "66414", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Energy Ramsey Storage", "external_id": "66414", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 1000, "power_mw": 500, "owner": "Hecate Energy Ramsey Storage, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RMSY": {"first": {"year": "2024", "month": "6", "entity id": "65483", "entity name": "Hecate Energy Ramsey Storage, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Ramsey Storage", "plant state": "TX", "plant id": "66414", "generator id": "RMSY", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66414", "date": "2024-06", "mw": 500}, "first_month": "2023-04", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-12", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65483", "entity name": "Hecate Energy Ramsey Storage, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Ramsey Storage", "plant state": "TX", "plant id": "66414", "generator id": "RMSY", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66414", "date": "2025-12", "mw": 500}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 500, "mwh_is_estimate": true, "mwh": 1000, "mwh_estimate": 1000, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Hecate Energy Ramsey Storage", "name_short": "Hecate Energy Ramsey", "owner": "Hecate Energy Ramsey Storage, LLC", "state": "texas", "country": "usa", "lat": "33.268313860275576", "long": "-95.01778862977751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.268313860275576+-95.01778862977751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Grid East Valley Storage", "city": "", "id": "982", "external_id": "66411", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "510", "power_mw": "255", "customer": "", "owner": "Hecate Grid East Valley Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "982", "external_id": "66411", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Grid East Valley Storage", "external_id": "66411", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 510, "power_mw": 255, "owner": "Hecate Grid East Valley Storage, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RMSY": {"first": {"year": "2024", "month": "6", "entity id": "65485", "entity name": "Hecate Grid East Valley Storage, LLC", "plant producer type": "IPP", "plant name": "Hecate Grid East Valley Storage", "plant state": "TX", "plant id": "66411", "generator id": "RMSY", "net summer capacity (mw)": "255", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66411", "date": "2024-06", "mw": 255}, "first_month": "2023-04", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-12", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65485", "entity name": "Hecate Grid East Valley Storage, LLC", "plant producer type": "IPP", "plant name": "Hecate Grid East Valley Storage", "plant state": "TX", "plant id": "66411", "generator id": "RMSY", "net summer capacity (mw)": "255", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66411", "date": "2025-12", "mw": 255}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 255, "mwh_is_estimate": true, "mwh": 510, "mwh_estimate": 510, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Hecate Grid East Valley Storage", "name_short": "Hecate Grid East Valley", "owner": "Hecate Grid East Valley Storage, LLC", "state": "texas", "country": "usa", "lat": "33.573962191467665", "long": "-95.10839853314751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.573962191467665+-95.10839853314751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 7 BESS 1", "city": "", "id": "985", "external_id": "66297", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "985", "external_id": "66297", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 7 BESS 1", "external_id": "66297", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A7BS1": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 7 BESS 1", "plant state": "TX", "plant id": "66297", "generator id": "A7BS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66297", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2025-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 7 BESS 1", "plant state": "TX", "plant id": "66297", "generator id": "A7BS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66297", "date": "2025-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Alamo 7 BESS 1", "name_short": "Alamo 7 BESS 1", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.724054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.724054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 7 BESS 2", "city": "", "id": "986", "external_id": "66298", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "986", "external_id": "66298", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 7 BESS 2", "external_id": "66298", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A7BS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 7 BESS 2", "plant state": "TX", "plant id": "66298", "generator id": "A7BS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66298", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2025-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 7 BESS 2", "plant state": "TX", "plant id": "66298", "generator id": "A7BS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66298", "date": "2025-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Alamo 7 BESS 2", "name_short": "Alamo 7 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.73176250275819", "long": "-95.36367096235749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.73176250275819+-95.36367096235749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gaia Hybrid", "city": "", "id": "1000", "external_id": "66342", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "152", "power_mw": "76", "customer": "", "owner": "Samsung Solar Energy 2, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1000", "external_id": "66342", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gaia Hybrid", "external_id": "66342", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 152, "power_mw": 76, "owner": "Samsung C&T Renewables, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GAIAB": {"first": {"year": "2025", "month": "12", "entity id": "65144", "entity name": "Samsung Solar Energy 2, LLC", "plant producer type": "IPP", "plant name": "Gaia Hybrid", "plant state": "TX", "plant id": "66342", "generator id": "GAIAB", "net summer capacity (mw)": "76.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66342", "date": "2025-12", "mw": 76}, "first_month": "2023-03", "changes": [{"month": "2023-12", "li": [{"name": "entity name", "from": "Samsung Solar Energy 2, LLC", "to": "Samsung C&T Renewables, LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "12", "entity id": "65144", "entity name": "Samsung C&T Renewables, LLC", "plant producer type": "IPP", "plant name": "Gaia Hybrid", "plant state": "TX", "plant id": "66342", "generator id": "GAIAB", "net summer capacity (mw)": "76.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66342", "date": "2025-12", "mw": 76}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 76, "mwh_is_estimate": true, "mwh": 152, "mwh_estimate": 152, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Gaia Hybrid", "name_short": "Gaia", "owner": "Samsung C&T Renewables, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eagle Springs Hybrid", "city": "", "id": "1002", "external_id": "66341", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Samsung Solar Energy 2, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1002", "external_id": "66341", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eagle Springs Hybrid", "external_id": "66341", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 122, "power_mw": 61, "owner": "Samsung C&T Renewables, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"EGSB": {"first": {"year": "2025", "month": "12", "entity id": "65144", "entity name": "Samsung Solar Energy 2, LLC", "plant producer type": "IPP", "plant name": "Eagle Springs Hybrid", "plant state": "TX", "plant id": "66341", "generator id": "EGSB", "net summer capacity (mw)": "61.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66341", "date": "2025-12", "mw": 61}, "first_month": "2023-03", "changes": [{"month": "2023-12", "li": [{"name": "entity name", "from": "Samsung Solar Energy 2, LLC", "to": "Samsung C&T Renewables, LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "12", "entity id": "65144", "entity name": "Samsung C&T Renewables, LLC", "plant producer type": "IPP", "plant name": "Eagle Springs Hybrid", "plant state": "TX", "plant id": "66341", "generator id": "EGSB", "net summer capacity (mw)": "61.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66341", "date": "2025-12", "mw": 61}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 61, "mwh_is_estimate": true, "mwh": 122, "mwh_estimate": 122, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Eagle Springs Hybrid", "name_short": "Eagle Springs", "owner": "Samsung C&T Renewables, LLC", "state": "texas", "country": "usa", "lat": "33.47991655110087", "long": "-95.2378412522475", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.47991655110087+-95.2378412522475", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Seven Flags BESS LLC", "city": "", "id": "1032", "external_id": "66689", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Seven Flags BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1032", "external_id": "66689", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Seven Flags BESS LLC", "external_id": "66689", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Seven Flags BESS LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"7FLAG": {"first": {"year": "2025", "month": "9", "entity id": "65695", "entity name": "Seven Flags BESS LLC", "plant producer type": "IPP", "plant name": "Seven Flags BESS LLC", "plant state": "TX", "plant id": "66689", "generator id": "7FLAG", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66689", "date": "2025-09", "mw": 100}, "first_month": "2023-07", "changes": [{"month": "2024-02", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-09", "to": "2025-12", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65695", "entity name": "Seven Flags BESS LLC", "plant producer type": "IPP", "plant name": "Seven Flags BESS LLC", "plant state": "TX", "plant id": "66689", "generator id": "7FLAG", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66689", "date": "2025-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Seven Flags BESS LLC", "name_short": "Seven Flags BESS", "owner": "Seven Flags BESS LLC", "state": "texas", "country": "usa", "lat": "33.392924333761584", "long": "-95.357575767415", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.392924333761584+-95.357575767415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Briggs Solar, LLC", "city": "", "id": "1034", "external_id": "66691", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Briggs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1034", "external_id": "66691", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Briggs Solar, LLC", "external_id": "66691", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Briggs Solar, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BRUGG": {"first": {"year": "2025", "month": "12", "entity id": "65697", "entity name": "Briggs Solar, LLC", "plant producer type": "IPP", "plant name": "Briggs Solar, LLC", "plant state": "TX", "plant id": "66691", "generator id": "BRUGG", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66691", "date": "2025-12", "mw": 70}, "first_month": "2023-07", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "65697", "entity name": "Briggs Solar, LLC", "plant producer type": "IPP", "plant name": "Briggs Solar, LLC", "plant state": "TX", "plant id": "66691", "generator id": "BRUGG", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66691", "date": "2025-12", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Briggs Solar, LLC", "name_short": "Briggs Solar", "owner": "Briggs Solar, LLC", "state": "texas", "country": "usa", "lat": "33.31329763558831", "long": "-95.3191725151675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.31329763558831+-95.3191725151675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Iron Belt", "city": "", "id": "1187", "external_id": "67059", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Iron Belt Energy Storage Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1187", "external_id": "67059", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Iron Belt", "external_id": "67059", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 800, "power_mw": 400, "owner": "Iron Belt Energy Storage Project, LLC", "status": "planning", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2025", "month": "12", "entity id": "65967", "entity name": "Iron Belt Energy Storage Project, LLC", "plant producer type": "IPP", "plant name": "Iron Belt", "plant state": "TX", "plant id": "67059", "generator id": "1", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67059", "date": "2025-12", "mw": 400}, "first_month": "2024-01", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "65967", "entity name": "Iron Belt Energy Storage Project, LLC", "plant producer type": "IPP", "plant name": "Iron Belt", "plant state": "TX", "plant id": "67059", "generator id": "1", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67059", "date": "2025-12", "mw": 400}, "current_month": "2024-06", "dates": {"first_heard": "2024-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 400, "mwh_is_estimate": true, "mwh": 800, "mwh_estimate": 800, "status": "planning", "status_class": "", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Iron Belt", "name_short": "Iron Belt", "owner": "Iron Belt Energy Storage Project, LLC", "state": "texas", "country": "usa", "lat": "33.70808533623373", "long": "-95.45800256921983", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.70808533623373+-95.45800256921983", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KRS I Anahola Solar Hybrid", "city": "", "id": "1312", "external_id": "58639", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Kauai Island Utility Cooperative", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1312", "external_id": "58639", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KRS I Anahola Solar Hybrid", "external_id": "58639", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Kauai Island Utility Cooperative", "status": "planning", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS8": {"first": {"year": "2025", "month": "12", "entity id": "10071", "entity name": "Kauai Island Utility Cooperative", "plant producer type": "Electric Utility", "plant name": "KRS I Anahola Solar Hybrid", "plant state": "HI", "plant id": "58639", "generator id": "BESS8", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58639", "date": "2025-12", "mw": 12}, "first_month": "2024-02", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "10071", "entity name": "Kauai Island Utility Cooperative", "plant producer type": "Electric Utility", "plant name": "KRS I Anahola Solar Hybrid", "plant state": "HI", "plant id": "58639", "generator id": "BESS8", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58639", "date": "2025-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "KRS I Anahola Solar Hybrid", "name_short": "KRS I Anahola Solar", "owner": "Kauai Island Utility Cooperative", "state": "hawaii", "country": "usa", "lat": "19.57422674385328", "long": "-155.56531208764", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.57422674385328+-155.56531208764", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KRS II Koloa Solar", "city": "", "id": "1313", "external_id": "58640", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Kauai Island Utility Cooperative", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1313", "external_id": "58640", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KRS II Koloa Solar", "external_id": "58640", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Kauai Island Utility Cooperative", "status": "planning", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS7": {"first": {"year": "2025", "month": "12", "entity id": "10071", "entity name": "Kauai Island Utility Cooperative", "plant producer type": "Electric Utility", "plant name": "KRS II Koloa Solar", "plant state": "HI", "plant id": "58640", "generator id": "BESS7", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58640", "date": "2025-12", "mw": 12}, "first_month": "2024-02", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "10071", "entity name": "Kauai Island Utility Cooperative", "plant producer type": "Electric Utility", "plant name": "KRS II Koloa Solar", "plant state": "HI", "plant id": "58640", "generator id": "BESS7", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58640", "date": "2025-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "KRS II Koloa Solar", "name_short": "KRS II Koloa Solar", "owner": "Kauai Island Utility Cooperative", "state": "hawaii", "country": "usa", "lat": "19.542269538483755", "long": "-155.56408453169715", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.542269538483755+-155.56408453169715", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Azalea (CA)", "city": "", "id": "1338", "external_id": "66890", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Idemitsu Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1338", "external_id": "66890", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Azalea (CA)", "external_id": "66890", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Idemitsu Renewables", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AZAL": {"first": {"year": "2025", "month": "12", "entity id": "63137", "entity name": "Idemitsu Renewables", "plant producer type": "IPP", "plant name": "Azalea (CA)", "plant state": "CA", "plant id": "66890", "generator id": "AZAL", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66890", "date": "2025-12", "mw": 60}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "63137", "entity name": "Idemitsu Renewables", "plant producer type": "IPP", "plant name": "Azalea (CA)", "plant state": "CA", "plant id": "66890", "generator id": "AZAL", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66890", "date": "2025-12", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Azalea (CA)", "name_short": "Azalea (CA)", "owner": "Idemitsu Renewables", "state": "california", "country": "usa", "lat": "40.98395968045898", "long": "-121.10912098932751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98395968045898+-121.10912098932751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bell Creek BESS LLC", "city": "", "id": "1360", "external_id": "67535", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Nexus Renewables U.S. Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1360", "external_id": "67535", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bell Creek BESS LLC", "external_id": "67535", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Nexus Renewables U.S. Inc.", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ASHU1": {"first": {"year": "2025", "month": "12", "entity id": "66234", "entity name": "Nexus Renewables U.S. Inc.", "plant producer type": "IPP", "plant name": "Bell Creek BESS LLC", "plant state": "TX", "plant id": "67535", "generator id": "ASHU1", "net summer capacity (mw)": "200.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67535", "date": "2025-12", "mw": 200}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "66234", "entity name": "Nexus Renewables U.S. Inc.", "plant producer type": "IPP", "plant name": "Bell Creek BESS LLC", "plant state": "TX", "plant id": "67535", "generator id": "ASHU1", "net summer capacity (mw)": "200.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67535", "date": "2025-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Bell Creek BESS LLC", "name_short": "Bell Creek BESS", "owner": "Nexus Renewables U.S. Inc.", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.153438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.153438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aratina Solar Center 1 Hybrid", "city": "", "id": "178", "external_id": "61167", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "91MC 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "178", "external_id": "61167", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Aratina Solar Center 1 Hybrid", "external_id": "61167", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "91MC 8me LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "8", "entity id": "60796", "entity name": "91MC 8me LLC", "plant producer type": "IPP", "plant name": "Aratina Solar Center 1 Hybrid", "plant state": "CA", "plant id": "61167", "generator id": "BESS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61167", "date": "2022-08", "mw": 50}, "first_month": "2020-09", "changes": [{"month": "2021-10", "li": [{"name": "date", "from": "2022-08", "to": "2023-09", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-12", "to": "2025-06", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2025-06", "to": "2025-11", "extra": "delayed by 5 months", "change_type": "timing"}, {"name": "mw", "from": 50, "to": 125, "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "11", "entity id": "60796", "entity name": "91MC 8me LLC", "plant producer type": "IPP", "plant name": "Aratina Solar Center 1 Hybrid", "plant state": "CA", "plant id": "61167", "generator id": "BESS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61167", "date": "2025-11", "mw": 125}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "go_live": "0 ~ 2025-11", "go_live_year_int": 2025, "name": "Aratina Solar Center 1 Hybrid", "name_short": "Aratina Solar Center 1", "owner": "91MC 8me LLC", "state": "california", "country": "usa", "lat": "40.93693686027558", "long": "-121.04439962977752", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.93693686027558+-121.04439962977752", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Parowan Solar", "city": "", "id": "944", "external_id": "65823", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "116", "power_mw": "58", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "944", "external_id": "65823", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Parowan Solar", "external_id": "65823", "state": "utah", "country": "usa", "mwh": 0, "estimate_mwh": 116, "power_mw": 58, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PARB": {"first": {"year": "2024", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Parowan Solar", "plant state": "UT", "plant id": "65823", "generator id": "PARB", "net summer capacity (mw)": "58", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65823", "date": "2024-12", "mw": 58}, "first_month": "2023-02", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2025-11", "extra": "delayed by 11 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "11", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Parowan Solar", "plant state": "UT", "plant id": "65823", "generator id": "PARB", "net summer capacity (mw)": "58", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65823", "date": "2025-11", "mw": 58}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 58, "mwh_is_estimate": true, "mwh": 116, "mwh_estimate": 116, "status": "planning", "status_class": "", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "go_live": "0 ~ 2025-11", "go_live_year_int": 2025, "name": "Parowan Solar", "name_short": "Parowan Solar", "owner": "Leeward Asset Management, LLC", "state": "utah", "country": "usa", "lat": "40.85668049473758", "long": "-109.64597614494501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.85668049473758+-109.64597614494501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Quail Ranch Solar and BESS", "city": "", "id": "1349", "external_id": "67204", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Quail Ranch Solar and Battery Energy Storage System", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1349", "external_id": "67204", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Quail Ranch Solar and BESS", "external_id": "67204", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Quail Ranch Solar and Battery Energy Storage System", "status": "planning", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"QRBES": {"first": {"year": "2025", "month": "11", "entity id": "66087", "entity name": "Quail Ranch Solar and Battery Energy Storage System", "plant producer type": "IPP", "plant name": "Quail Ranch Solar and BESS", "plant state": "NM", "plant id": "67204", "generator id": "QRBES", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67204", "date": "2025-11", "mw": 100}, "first_month": "2024-03", "changes": [], "current": {"year": "2025", "month": "11", "entity id": "66087", "entity name": "Quail Ranch Solar and Battery Energy Storage System", "plant producer type": "IPP", "plant name": "Quail Ranch Solar and BESS", "plant state": "NM", "plant id": "67204", "generator id": "QRBES", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67204", "date": "2025-11", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "go_live": "0 ~ 2025-11", "go_live_year_int": 2025, "name": "Quail Ranch Solar and BESS", "name_short": "Quail Ranch Solar", "owner": "Quail Ranch Solar and Battery Energy Storage System", "state": "new mexico", "country": "usa", "lat": "36.53576772443623", "long": "-103.94237271153004", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.53576772443623+-103.94237271153004", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Menifee Power Bank", "city": "", "id": "947", "external_id": "66494", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Nova Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "947", "external_id": "66494", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Menifee Power Bank", "external_id": "66494", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 1350, "power_mw": 675, "owner": "Nova Power, LLC", "status": "construction", "date_first_heard": "2023-04", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"NOVA1": {"first": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Menifee Power Bank", "plant producer type": "IPP", "plant name": "Nova Power", "plant state": "CA", "plant id": "66494", "generator id": "NOVA1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66494", "date": "2024-08", "mw": 230}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity name", "from": "Menifee Power Bank", "to": "Nova Power, LLC", "extra": "", "change_type": "misc"}, {"name": "plant name", "from": "Nova Power", "to": "Menifee Power Bank", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2024-08", "to": "2024-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66494", "date": "2024-06", "mw": 230}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-10"}, "month_disappeared": ""}, "NOVA2": {"first": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Menifee Power Bank", "plant producer type": "IPP", "plant name": "Nova Power", "plant state": "CA", "plant id": "66494", "generator id": "NOVA2", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66494", "date": "2024-08", "mw": 230}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity name", "from": "Menifee Power Bank", "to": "Nova Power, LLC", "extra": "", "change_type": "misc"}, {"name": "plant name", "from": "Nova Power", "to": "Menifee Power Bank", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2024-08", "to": "2024-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA2", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66494", "date": "2024-07", "mw": 230}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-10"}, "month_disappeared": ""}, "NOVA3": {"first": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Menifee Power Bank", "plant producer type": "IPP", "plant name": "Nova Power", "plant state": "CA", "plant id": "66494", "generator id": "NOVA3", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66494", "date": "2024-08", "mw": 50}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity name", "from": "Menifee Power Bank", "to": "Nova Power, LLC", "extra": "", "change_type": "misc"}, {"name": "plant name", "from": "Nova Power", "to": "Menifee Power Bank", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2024-08", "to": "2024-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2024-09", "to": "2024-08", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA3", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66494", "date": "2024-08", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2024-01"}, "month_disappeared": ""}, "NOVA4": {"first": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA4", "net summer capacity (mw)": "110", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66494", "date": "2024-08", "mw": 110}, "first_month": "2023-10", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-08", "to": "2024-09", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA4", "net summer capacity (mw)": "110", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66494", "date": "2024-09", "mw": 110}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}, "NOVA5": {"first": {"year": "2025", "month": "10", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA5", "net summer capacity (mw)": "55", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66494", "date": "2025-10", "mw": 55}, "first_month": "2023-12", "changes": [], "current": {"year": "2025", "month": "10", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA5", "net summer capacity (mw)": "55", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66494", "date": "2025-10", "mw": 55}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 675, "mwh_is_estimate": true, "mwh": 1350, "mwh_estimate": 1350, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-04", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "go_live": "0 ~ 2025-10", "go_live_year_int": 2025, "name": "Menifee Power Bank", "name_short": "Menifee Power Bank", "owner": "Nova Power, LLC", "state": "california", "country": "usa", "lat": "41.31198697668374", "long": "-121.43759074903645", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.31198697668374+-121.43759074903645", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Baldy Mesa Solar & Storage", "city": "", "id": "957", "external_id": "66598", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "957", "external_id": "66598", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Baldy Mesa Solar & Storage", "external_id": "66598", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2023-05", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BDMSS": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Baldy Mesa Solar & Storage", "plant state": "CA", "plant id": "66598", "generator id": "BDMSS", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66598", "date": "2023-12", "mw": 75}, "first_month": "2023-05", "changes": [{"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2025-10", "extra": "delayed by 22 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "10", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Baldy Mesa Solar & Storage", "plant state": "CA", "plant id": "66598", "generator id": "BDMSS", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66598", "date": "2025-10", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-05", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "go_live": "0 ~ 2025-10", "go_live_year_int": 2025, "name": "Baldy Mesa Solar & Storage", "name_short": "Baldy Mesa Solar &", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "40.91718668342877", "long": "-121.15075154591771", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.91718668342877+-121.15075154591771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pluto Energy Storage", "city": "", "id": "1332", "external_id": "67328", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Pluto Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1332", "external_id": "67328", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pluto Energy Storage", "external_id": "67328", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Pluto Energy Storage, LLC", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PLUTO": {"first": {"year": "2025", "month": "10", "entity id": "66169", "entity name": "Pluto Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Pluto Energy Storage", "plant state": "AZ", "plant id": "67328", "generator id": "PLUTO", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67328", "date": "2025-10", "mw": 75}, "first_month": "2024-04", "changes": [], "current": {"year": "2025", "month": "10", "entity id": "66169", "entity name": "Pluto Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Pluto Energy Storage", "plant state": "AZ", "plant id": "67328", "generator id": "PLUTO", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67328", "date": "2025-10", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "go_live": "0 ~ 2025-10", "go_live_year_int": 2025, "name": "Pluto Energy Storage", "name_short": "Pluto", "owner": "Pluto Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "36.417299333761584", "long": "-109.969391767415", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.417299333761584+-109.969391767415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Milagro Solar I", "city": "", "id": "1350", "external_id": "67528", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Milagro Solar I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1350", "external_id": "67528", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Milagro Solar I", "external_id": "67528", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Milagro Solar I, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MLRBS": {"first": {"year": "2025", "month": "10", "entity id": "66250", "entity name": "Milagro Solar I, LLC", "plant producer type": "IPP", "plant name": "Milagro Solar I", "plant state": "NM", "plant id": "67528", "generator id": "MLRBS", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67528", "date": "2025-10", "mw": 75}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "10", "entity id": "66250", "entity name": "Milagro Solar I, LLC", "plant producer type": "IPP", "plant name": "Milagro Solar I", "plant state": "NM", "plant id": "67528", "generator id": "MLRBS", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67528", "date": "2025-10", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "go_live": "0 ~ 2025-10", "go_live_year_int": 2025, "name": "Milagro Solar I", "name_short": "Milagro Solar I", "owner": "Milagro Solar I, LLC", "state": "new mexico", "country": "usa", "lat": "36.449861", "long": "-103.77797899999999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.449861+-103.77797899999999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaver Creek I", "city": "", "id": "558", "external_id": "65019", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Beaver Creek Wind I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "558", "external_id": "65019", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaver Creek I", "external_id": "65019", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Beaver Creek Wind I, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCW1B": {"first": {"year": "2023", "month": "6", "entity id": "64434", "entity name": "Beaver Creek Wind I, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek I", "plant state": "MT", "plant id": "65019", "generator id": "BCW1B", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65019", "date": "2023-06", "mw": 30}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-09", "extra": "delayed by 9 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "9", "entity id": "64434", "entity name": "Beaver Creek Wind I, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek I", "plant state": "MT", "plant id": "65019", "generator id": "BCW1B", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65019", "date": "2025-09", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "go_live": "0 ~ 2025-09", "go_live_year_int": 2025, "name": "Beaver Creek I", "name_short": "Beaver Creek I", "owner": "Beaver Creek Wind I, LLC", "state": "montana", "country": "usa", "lat": "48.48858627036728", "long": "-105.49814730955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.48858627036728+-105.49814730955251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaver Creek IV", "city": "", "id": "559", "external_id": "65023", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Beaver Creek Wind IV, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "559", "external_id": "65023", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaver Creek IV", "external_id": "65023", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Beaver Creek Wind IV, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCW4B": {"first": {"year": "2023", "month": "6", "entity id": "64437", "entity name": "Beaver Creek Wind IV, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek IV", "plant state": "MT", "plant id": "65023", "generator id": "BCW4B", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65023", "date": "2023-06", "mw": 30}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-09", "extra": "delayed by 9 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "9", "entity id": "64437", "entity name": "Beaver Creek Wind IV, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek IV", "plant state": "MT", "plant id": "65023", "generator id": "BCW4B", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65023", "date": "2025-09", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "go_live": "0 ~ 2025-09", "go_live_year_int": 2025, "name": "Beaver Creek IV", "name_short": "Beaver Creek IV", "owner": "Beaver Creek Wind IV, LLC", "state": "montana", "country": "usa", "lat": "48.558727935676266", "long": "-105.43802115814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.558727935676266+-105.43802115814404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Noria Hondo Solar (Hybrid)", "city": "", "id": "628", "external_id": "65344", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Noria Hondo Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "628", "external_id": "65344", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Noria Hondo Solar (Hybrid)", "external_id": "65344", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Noria Hondo Solar LLC", "status": "planning", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"66149": {"first": {"year": "2024", "month": "9", "entity id": "64674", "entity name": "Noria Hondo Solar LLC", "plant producer type": "IPP", "plant name": "Noria Hondo Solar (Hybrid)", "plant state": "TX", "plant id": "65344", "generator id": "66149", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65344", "date": "2024-09", "mw": 75}, "first_month": "2022-03", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2024-09", "to": "2025-09", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "9", "entity id": "64674", "entity name": "Noria Hondo Solar LLC", "plant producer type": "IPP", "plant name": "Noria Hondo Solar (Hybrid)", "plant state": "TX", "plant id": "65344", "generator id": "66149", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65344", "date": "2025-09", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "go_live": "0 ~ 2025-09", "go_live_year_int": 2025, "name": "Noria Hondo Solar (Hybrid)", "name_short": "Noria Hondo Solar (Hybrid)", "owner": "Noria Hondo Solar LLC", "state": "texas", "country": "usa", "lat": "33.58101561449517", "long": "-95.448185670785", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.58101561449517+-95.448185670785", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beehive Energy Storage", "city": "", "id": "1307", "external_id": "67184", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Beehive Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1307", "external_id": "67184", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beehive Energy Storage", "external_id": "67184", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Beehive Energy Storage, LLC", "status": "planning", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BHV1": {"first": {"year": "2025", "month": "9", "entity id": "66053", "entity name": "Beehive Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Beehive Energy Storage", "plant state": "AZ", "plant id": "67184", "generator id": "BHV1", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67184", "date": "2025-09", "mw": 250}, "first_month": "2024-02", "changes": [], "current": {"year": "2025", "month": "9", "entity id": "66053", "entity name": "Beehive Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Beehive Energy Storage", "plant state": "AZ", "plant id": "67184", "generator id": "BHV1", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67184", "date": "2025-09", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "go_live": "0 ~ 2025-09", "go_live_year_int": 2025, "name": "Beehive Energy Storage", "name_short": "Beehive", "owner": "Beehive Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "36.60301761713374", "long": "-109.97577292885305", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.60301761713374+-109.97577292885305", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cross Town", "city": "Gorham", "id": "114", "external_id": "66606", "state": "maine", "country": "usa", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "175", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.68383", "long": "-70.39786", "coords_hint": "1", "use_case": "", "notes": "pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ** got the info about tesla from twitter thread as all plus power project seem to be tesla", "project_website": "https://www.crosstownenergystorage.com/about", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "114", "external_id": "66606", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cross Town Energy Storage", "external_id": "66606", "state": "maine", "country": "usa", "mwh": 0, "estimate_mwh": 350, "power_mw": 175, "owner": "Cross Town Energy Storage LLC", "status": "construction", "date_first_heard": "2023-05", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CROS1": {"first": {"year": "2025", "month": "3", "entity id": "65639", "entity name": "Cross Town Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cross Town Energy Storage", "plant state": "ME", "plant id": "66606", "generator id": "CROS1", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66606", "date": "2025-03", "mw": 175}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-03", "to": "2025-08", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "8", "entity id": "65639", "entity name": "Cross Town Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cross Town Energy Storage", "plant state": "ME", "plant id": "66606", "generator id": "CROS1", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66606", "date": "2025-08", "mw": 175}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 175, "mwh_is_estimate": false, "mwh": 350, "mwh_estimate": 350, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-05", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "go_live": "0 ~ 2025-08", "go_live_year_int": 2025, "name": "Cross Town Energy Storage", "name_short": "Cross Town", "owner": "Cross Town Energy Storage LLC", "state": "maine", "country": "usa", "lat": "43.68383", "long": "-70.39786", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:43.68383+-70.39786", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ", " got the info about tesla from twitter thread as all plus power project seem to be tesla"], "links": ["https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Midpoint Solar, LLC", "city": "", "id": "1062", "external_id": "66897", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "104", "power_mw": "52", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1062", "external_id": "66897", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Midpoint Solar, LLC", "external_id": "66897", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 104, "power_mw": 52, "owner": "Sunraycer Assets I LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MIDBA": {"first": {"year": "2025", "month": "8", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Midpoint Solar, LLC", "plant state": "TX", "plant id": "66897", "generator id": "MIDBA", "net summer capacity (mw)": "52.2", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66897", "date": "2025-08", "mw": 52}, "first_month": "2023-09", "changes": [], "current": {"year": "2025", "month": "8", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Midpoint Solar, LLC", "plant state": "TX", "plant id": "66897", "generator id": "MIDBA", "net summer capacity (mw)": "52.2", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66897", "date": "2025-08", "mw": 52}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 52, "mwh_is_estimate": true, "mwh": 104, "mwh_estimate": 104, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "go_live": "0 ~ 2025-08", "go_live_year_int": 2025, "name": "Midpoint Solar, LLC", "name_short": "Midpoint Solar", "owner": "Sunraycer Assets I LLC", "state": "texas", "country": "usa", "lat": "33.550450781375964", "long": "-95.1407592129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.550450781375964+-95.1407592129225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TREX US Red Holly", "city": "", "id": "252", "external_id": "63202", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "TREX US Red Holly LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "252", "external_id": "63202", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TREX US Red Holly", "external_id": "63202", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "TREX US Red Holly LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"701-S": {"first": {"year": "2021", "month": "8", "entity id": "62936", "entity name": "TREX US Red Holly LLC", "plant producer type": "IPP", "plant name": "TREX US Red Holly", "plant state": "TX", "plant id": "63202", "generator id": "701-S", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63202", "date": "2021-08", "mw": 50}, "first_month": "2020-09", "changes": [{"month": "2021-05", "li": [{"name": "date", "from": "2021-08", "to": "2022-05", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-05", "to": "2024-07", "extra": "delayed by 26 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-07", "to": "2025-07", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "7", "entity id": "62936", "entity name": "TREX US Red Holly LLC", "plant producer type": "IPP", "plant name": "TREX US Red Holly", "plant state": "TX", "plant id": "63202", "generator id": "701-S", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63202", "date": "2025-07", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "TREX US Red Holly", "name_short": "TREX US Red Holly", "owner": "TREX US Red Holly LLC", "state": "texas", "country": "usa", "lat": "33.369412923669884", "long": "-95.38993644719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.369412923669884+-95.38993644719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lunis Creek Solar and BESS SLF", "city": "", "id": "783", "external_id": "65852", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1242", "power_mw": "621", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "783", "external_id": "65852", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lunis Creek Solar and BESS SLF", "external_id": "65852", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 1242, "power_mw": 621, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LUNBS": {"first": {"year": "2024", "month": "3", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Lunis Creek Solar and BESS SLF", "plant state": "TX", "plant id": "65852", "generator id": "LUNBS", "net summer capacity (mw)": "621.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65852", "date": "2024-03", "mw": 621}, "first_month": "2022-09", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-12", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2025-07", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "7", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Lunis Creek Solar and BESS SLF", "plant state": "TX", "plant id": "65852", "generator id": "LUNBS", "net summer capacity (mw)": "621.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65852", "date": "2025-07", "mw": 621}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 621, "mwh_is_estimate": true, "mwh": 1242, "mwh_estimate": 1242, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Lunis Creek Solar and BESS SLF", "name_short": "Lunis Creek Solar and BESS SLF", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "33.63689184072874", "long": "-95.1405985329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.63689184072874+-95.1405985329819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tehuacana Creek 1 Solar and BESS", "city": "", "id": "788", "external_id": "65855", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.02785", "long": "-96.498753", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, "internal_id": "788", "external_id": "65855", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Tehuacana Creek 1 Solar and BESS", "external_id": "65855", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 836, "power_mw": 418, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TE1BS": {"first": {"year": "2024", "month": "5", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Tehuacana Creek 1 Solar and BESS", "plant state": "TX", "plant id": "65855", "generator id": "TE1BS", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65855", "date": "2024-05", "mw": 350}, "first_month": "2022-09", "changes": [{"month": "2023-07", "li": [{"name": "date", "from": "2024-05", "to": "2025-07", "extra": "delayed by 14 months", "change_type": "timing"}, {"name": "mw", "from": 350, "to": 418, "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "7", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Tehuacana Creek 1 Solar and BESS", "plant state": "TX", "plant id": "65855", "generator id": "TE1BS", "net summer capacity (mw)": "418", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65855", "date": "2025-07", "mw": 418}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 418, "mwh_is_estimate": true, "mwh": 836, "mwh_estimate": 836, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Tehuacana Creek 1 Solar and BESS", "name_short": "Tehuacana Creek 1 Solar", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "32.02785", "long": "-96.498753", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.02785+-96.498753", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarproponent.com/projects/#"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mulligan Solar, LLC", "city": "", "id": "971", "external_id": "65349", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Mulligan Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "971", "external_id": "65349", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mulligan Solar, LLC", "external_id": "65349", "state": "illinois", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Mulligan Solar", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MLGA2": {"first": {"year": "2025", "month": "6", "entity id": "64684", "entity name": "Mulligan Solar", "plant producer type": "IPP", "plant name": "Mulligan Solar, LLC", "plant state": "IL", "plant id": "65349", "generator id": "MLGA2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65349", "date": "2025-06", "mw": 40}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2025-06", "to": "2025-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2025", "month": "7", "entity id": "64684", "entity name": "Mulligan Solar", "plant producer type": "IPP", "plant name": "Mulligan Solar, LLC", "plant state": "IL", "plant id": "65349", "generator id": "MLGA2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65349", "date": "2025-07", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Mulligan Solar, LLC", "name_short": "Mulligan Solar", "owner": "Mulligan Solar", "state": "illinois", "country": "usa", "lat": "42.275655246911256", "long": "-88.86110215563981", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.275655246911256+-88.86110215563981", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brendale BESS", "city": "brisbane", "id": "1392", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "410", "estimate_mwh": "", "power_mw": "205", "customer": "", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.329132", "long": "152.973193", "coords_hint": "1", "use_case": "", "notes": "got the location from the picture and in the energy storage article it says it is hosted on unitywater site", "project_website": "https://akayshaenergy.com/projects/brendale-bess", "link1": "https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1392", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 205, "mwh_is_estimate": false, "mwh": 410, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Brendale BESS", "name_short": "Brendale", "owner": "Akaysha Energy", "state": "queensland", "country": "australia", "lat": "-27.329132", "long": "152.973193", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.329132+152.973193", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the location from the picture and in the energy storage article it says it is hosted on unitywater site"], "links": ["https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Black Walnut Energy Storage LLC", "city": "", "id": "622", "external_id": "65396", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Black Walnut Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "622", "external_id": "65396", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Black Walnut Energy Storage LLC", "external_id": "65396", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Black Walnut Energy Storage LLC", "status": "planning", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BW1": {"first": {"year": "2023", "month": "6", "entity id": "64739", "entity name": "Black Walnut Energy Storage LLC", "plant producer type": "IPP", "plant name": "Black Walnut Energy Storage LLC", "plant state": "CA", "plant id": "65396", "generator id": "BW1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65396", "date": "2023-06", "mw": 15}, "first_month": "2022-03", "changes": [{"month": "2022-10", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-12", "to": "2025-06", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "6", "entity id": "64739", "entity name": "Black Walnut Energy Storage LLC", "plant producer type": "IPP", "plant name": "Black Walnut Energy Storage LLC", "plant state": "CA", "plant id": "65396", "generator id": "BW1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65396", "date": "2025-06", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Black Walnut Energy Storage LLC", "name_short": "Black Walnut Energy Storage", "owner": "Black Walnut Energy Storage LLC", "state": "california", "country": "usa", "lat": "41.17205096119257", "long": "-121.23209157247251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17205096119257+-121.23209157247251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Humidor Storage I", "city": "", "id": "694", "external_id": "65703", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Hecate Grid Humidor Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "694", "external_id": "65703", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Humidor Storage I", "external_id": "65703", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Hecate Grid Humidor Storage 1 LLC", "status": "planning", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HEHUM": {"first": {"year": "2023", "month": "11", "entity id": "64970", "entity name": "Hecate Grid Humidor Storage 1 LLC", "plant producer type": "IPP", "plant name": "Humidor Storage I", "plant state": "CA", "plant id": "65703", "generator id": "HEHUM", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65703", "date": "2023-11", "mw": 300}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-01", "to": "2025-06", "extra": "delayed by 17 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "6", "entity id": "64970", "entity name": "Hecate Grid Humidor Storage 1 LLC", "plant producer type": "IPP", "plant name": "Humidor Storage I", "plant state": "CA", "plant id": "65703", "generator id": "HEHUM", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65703", "date": "2025-06", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Humidor Storage I", "name_short": "Humidor Storage I", "owner": "Hecate Grid Humidor Storage 1 LLC", "state": "california", "country": "usa", "lat": "40.867793853632904", "long": "-121.38286555449248", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.867793853632904+-121.38286555449248", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yaupon Solar Project (Hybrid)", "city": "", "id": "942", "external_id": "66216", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Yaupon Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "942", "external_id": "66216", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Yaupon Solar Project (Hybrid)", "external_id": "66216", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Yaupon Solar, LLC", "status": "planning", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2025", "month": "6", "entity id": "65329", "entity name": "Yaupon Solar, LLC", "plant producer type": "IPP", "plant name": "Yaupon Solar Project (Hybrid)", "plant state": "TX", "plant id": "66216", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66216", "date": "2025-06", "mw": 100}, "first_month": "2023-02", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "65329", "entity name": "Yaupon Solar, LLC", "plant producer type": "IPP", "plant name": "Yaupon Solar Project (Hybrid)", "plant state": "TX", "plant id": "66216", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66216", "date": "2025-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Yaupon Solar Project (Hybrid)", "name_short": "Yaupon Solar Project (Hybrid)", "owner": "Yaupon Solar, LLC", "state": "texas", "country": "usa", "lat": "33.526939371284264", "long": "-95.1731198926975", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.526939371284264+-95.1731198926975", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "OCI SunRoper", "city": "", "id": "980", "external_id": "65893", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "520", "power_mw": "260", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "980", "external_id": "65893", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "OCI SunRoper", "external_id": "65893", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 520, "power_mw": 260, "owner": "OCI Solar Power", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OCIES": {"first": {"year": "2025", "month": "6", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "OCI SunRoper", "plant state": "TX", "plant id": "65893", "generator id": "OCIES", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65893", "date": "2025-06", "mw": 260}, "first_month": "2023-03", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "OCI SunRoper", "plant state": "TX", "plant id": "65893", "generator id": "OCIES", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65893", "date": "2025-06", "mw": 260}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 260, "mwh_is_estimate": true, "mwh": 520, "mwh_estimate": 520, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "OCI SunRoper", "name_short": "OCI SunRoper", "owner": "OCI Solar Power", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.113438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.113438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elevate Middletown", "city": "", "id": "1041", "external_id": "66786", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "550", "power_mw": "275", "customer": "", "owner": "Elevate Middletown, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1041", "external_id": "66786", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elevate Middletown", "external_id": "66786", "state": "connecticut", "country": "usa", "mwh": 0, "estimate_mwh": 550, "power_mw": 275, "owner": "Elevate Middletown, LLC", "status": "planning", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELVMT": {"first": {"year": "2025", "month": "6", "entity id": "65762", "entity name": "Elevate Middletown, LLC", "plant producer type": "IPP", "plant name": "Elevate Middletown", "plant state": "CT", "plant id": "66786", "generator id": "ELVMT", "net summer capacity (mw)": "275", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66786", "date": "2025-06", "mw": 275}, "first_month": "2023-08", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "65762", "entity name": "Elevate Middletown, LLC", "plant producer type": "IPP", "plant name": "Elevate Middletown", "plant state": "CT", "plant id": "66786", "generator id": "ELVMT", "net summer capacity (mw)": "275", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66786", "date": "2025-06", "mw": 275}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 275, "mwh_is_estimate": true, "mwh": 550, "mwh_estimate": 550, "status": "planning", "status_class": "", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Elevate Middletown", "name_short": "Elevate Middletown", "owner": "Elevate Middletown, LLC", "state": "connecticut", "country": "usa", "lat": "41.93570473342624", "long": "-71.93485223533789", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.93570473342624+-71.93485223533789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elevate Arthur Kill", "city": "", "id": "1052", "external_id": "66785", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "GB Arthur Kill Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1052", "external_id": "66785", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elevate Arthur Kill", "external_id": "66785", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "GB Arthur Kill Storage LLC", "status": "planning", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELVAK": {"first": {"year": "2025", "month": "6", "entity id": "65761", "entity name": "GB Arthur Kill Storage LLC", "plant producer type": "IPP", "plant name": "Elevate Arthur Kill", "plant state": "NY", "plant id": "66785", "generator id": "ELVAK", "net summer capacity (mw)": "15.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66785", "date": "2025-06", "mw": 15}, "first_month": "2023-08", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "65761", "entity name": "GB Arthur Kill Storage LLC", "plant producer type": "IPP", "plant name": "Elevate Arthur Kill", "plant state": "NY", "plant id": "66785", "generator id": "ELVAK", "net summer capacity (mw)": "15.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66785", "date": "2025-06", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Elevate Arthur Kill", "name_short": "Elevate Arthur Kill", "owner": "GB Arthur Kill Storage LLC", "state": "new york", "country": "usa", "lat": "42.56736592366988", "long": "-75.62003844719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.56736592366988+-75.62003844719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Albatross Solar, LLC", "city": "", "id": "1064", "external_id": "66894", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1064", "external_id": "66894", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Albatross Solar, LLC", "external_id": "66894", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Sunraycer Assets I LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ALBBA": {"first": {"year": "2025", "month": "6", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Albatross Solar, LLC", "plant state": "TX", "plant id": "66894", "generator id": "ALBBA", "net summer capacity (mw)": "50.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66894", "date": "2025-06", "mw": 50}, "first_month": "2023-09", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Albatross Solar, LLC", "plant state": "TX", "plant id": "66894", "generator id": "ALBBA", "net summer capacity (mw)": "50.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66894", "date": "2025-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Albatross Solar, LLC", "name_short": "Albatross Solar", "owner": "Sunraycer Assets I LLC", "state": "texas", "country": "usa", "lat": "33.65187375538939", "long": "-95.20916246517001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65187375538939+-95.20916246517001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Swanbank", "city": "Ipswich", "id": "1321", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "", "developer": "Clean Co", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "cost_million": "330", "cost_currency": "USD", "cost_incl_solar": "", "lat": "-27.649131", "long": "152.814807", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1759460910530265090", "link2": "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/", "link3": "", "link4": ""}, "internal_id": "1321", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 500, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Swanbank", "name_short": "Swanbank", "owner": "", "state": "queensland", "country": "australia", "lat": "-27.649131", "long": "152.814807", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.649131+152.814807", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1759460910530265090", "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Sun Streams 4", "city": "", "id": "1324", "external_id": "67291", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Sun Streams Expansion, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1324", "external_id": "67291", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sun Streams 4", "external_id": "67291", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Sun Streams Expansion, LLC", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2025", "month": "6", "entity id": "66152", "entity name": "Sun Streams Expansion, LLC", "plant producer type": "IPP", "plant name": "Sun Streams 4", "plant state": "AZ", "plant id": "67291", "generator id": "GEN02", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67291", "date": "2025-06", "mw": 300}, "first_month": "2024-04", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66152", "entity name": "Sun Streams Expansion, LLC", "plant producer type": "IPP", "plant name": "Sun Streams 4", "plant state": "AZ", "plant id": "67291", "generator id": "GEN02", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67291", "date": "2025-06", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Sun Streams 4", "name_short": "Sun Streams 4", "owner": "Sun Streams Expansion, LLC", "state": "arizona", "country": "usa", "lat": "36.60016423408578", "long": "-109.84569982472001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.60016423408578+-109.84569982472001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Serrano", "city": "", "id": "1327", "external_id": "67503", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "426", "power_mw": "213", "customer": "", "owner": "Serrano Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1327", "external_id": "67503", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Serrano", "external_id": "67503", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 426, "power_mw": 213, "owner": "Serrano Solar, LLC", "status": "construction", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2025", "month": "6", "entity id": "66226", "entity name": "Serrano Solar, LLC", "plant producer type": "IPP", "plant name": "Serrano", "plant state": "AZ", "plant id": "67503", "generator id": "GEN02", "net summer capacity (mw)": "213.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67503", "date": "2025-06", "mw": 213}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66226", "entity name": "Serrano Solar, LLC", "plant producer type": "IPP", "plant name": "Serrano", "plant state": "AZ", "plant id": "67503", "generator id": "GEN02", "net summer capacity (mw)": "213.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67503", "date": "2025-06", "mw": 213}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 213, "mwh_is_estimate": true, "mwh": 426, "mwh_estimate": 426, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Serrano", "name_short": "Serrano", "owner": "Serrano Solar, LLC", "state": "arizona", "country": "usa", "lat": "36.63537829690874", "long": "-109.99928433894475", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.63537829690874+-109.99928433894475", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kuna BESS", "city": "", "id": "1345", "external_id": "67549", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Kuna BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1345", "external_id": "67549", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kuna BESS", "external_id": "67549", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Kuna BESS, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2025", "month": "6", "entity id": "66265", "entity name": "Kuna BESS, LLC", "plant producer type": "IPP", "plant name": "Kuna BESS", "plant state": "ID", "plant id": "67549", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67549", "date": "2025-06", "mw": 150}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66265", "entity name": "Kuna BESS, LLC", "plant producer type": "IPP", "plant name": "Kuna BESS", "plant state": "ID", "plant id": "67549", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67549", "date": "2025-06", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Kuna BESS", "name_short": "Kuna", "owner": "Kuna BESS, LLC", "state": "idaho", "country": "usa", "lat": "44.453334", "long": "-112.673786", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.453334+-112.673786", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Happy Valley Battery Storage", "city": "", "id": "1346", "external_id": "67573", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "164", "power_mw": "82", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1346", "external_id": "67573", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Happy Valley Battery Storage", "external_id": "67573", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 164, "power_mw": 82, "owner": "Idaho Power Co", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HPVY": {"first": {"year": "2025", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Happy Valley Battery Storage", "plant state": "ID", "plant id": "67573", "generator id": "HPVY", "net summer capacity (mw)": "82", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67573", "date": "2025-06", "mw": 82}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Happy Valley Battery Storage", "plant state": "ID", "plant id": "67573", "generator id": "HPVY", "net summer capacity (mw)": "82", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67573", "date": "2025-06", "mw": 82}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 82, "mwh_is_estimate": true, "mwh": 164, "mwh_estimate": 164, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Happy Valley Battery Storage", "name_short": "Happy Valley", "owner": "Idaho Power Co", "state": "idaho", "country": "usa", "lat": "44.464957981454575", "long": "-112.7392976028075", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.464957981454575+-112.7392976028075", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hornshadow Solar II, LLC", "city": "", "id": "1372", "external_id": "67511", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Hornshadow Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1372", "external_id": "67511", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hornshadow Solar II, LLC", "external_id": "67511", "state": "utah", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Hornshadow Solar II, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HS2ES": {"first": {"year": "2025", "month": "6", "entity id": "66070", "entity name": "Hornshadow Solar II, LLC", "plant producer type": "IPP", "plant name": "Hornshadow Solar II, LLC", "plant state": "UT", "plant id": "67511", "generator id": "HS2ES", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67511", "date": "2025-06", "mw": 50}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66070", "entity name": "Hornshadow Solar II, LLC", "plant producer type": "IPP", "plant name": "Hornshadow Solar II, LLC", "plant state": "UT", "plant id": "67511", "generator id": "HS2ES", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67511", "date": "2025-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Hornshadow Solar II, LLC", "name_short": "Hornshadow Solar II", "owner": "Hornshadow Solar II, LLC", "state": "utah", "country": "usa", "lat": "40.588750513578184", "long": "-109.84675012696499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.588750513578184+-109.84675012696499", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hornshadow Solar, LLC", "city": "", "id": "1373", "external_id": "67497", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Hornshadow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1373", "external_id": "67497", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hornshadow Solar, LLC", "external_id": "67497", "state": "utah", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Hornshadow Solar, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HSESS": {"first": {"year": "2025", "month": "6", "entity id": "66059", "entity name": "Hornshadow Solar, LLC", "plant producer type": "IPP", "plant name": "Hornshadow Solar, LLC", "plant state": "UT", "plant id": "67497", "generator id": "HSESS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67497", "date": "2025-06", "mw": 25}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66059", "entity name": "Hornshadow Solar, LLC", "plant producer type": "IPP", "plant name": "Hornshadow Solar, LLC", "plant state": "UT", "plant id": "67497", "generator id": "HSESS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67497", "date": "2025-06", "mw": 25}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Hornshadow Solar, LLC", "name_short": "Hornshadow Solar", "owner": "Hornshadow Solar, LLC", "state": "utah", "country": "usa", "lat": "40.53024549915876", "long": "-109.81897476197224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.53024549915876+-109.81897476197224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Papago", "city": "Maricopa County", "id": "75", "external_id": "66779", "state": "arizona", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "", "power_mw": "300", "customer": "Recurrent Energy", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.481046", "long": "-113.03863", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/papago/", "link1": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/7254?fileID=56298", "link2": "", "link3": "", "link4": ""}, "internal_id": "75", "external_id": "66779", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Papago Energy Storage", "external_id": "66779", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "RE Papago LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PPABA": {"first": {"year": "2025", "month": "5", "entity id": "65751", "entity name": "RE Papago LLC", "plant producer type": "IPP", "plant name": "Papago Energy Storage", "plant state": "AZ", "plant id": "66779", "generator id": "PPABA", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66779", "date": "2025-05", "mw": 300}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "65751", "entity name": "RE Papago LLC", "plant producer type": "IPP", "plant name": "Papago Energy Storage", "plant state": "AZ", "plant id": "66779", "generator id": "PPABA", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66779", "date": "2025-05", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": false, "mwh": 1200, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Papago Energy Storage", "name_short": "Papago", "owner": "RE Papago LLC", "state": "arizona", "country": "usa", "lat": "33.481046", "long": "-113.03863", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.481046+-113.03863", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.maricopa.gov/AgendaCenter/ViewFile/Item/7254?fileID=56298"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cranberry Point", "city": "Carver", "id": "113", "external_id": "62844", "state": "massachusetts", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.896693", "long": "-70.786639", "coords_hint": "1", "use_case": "", "notes": "got the info about tesla as manufacturer from twitter thread and FAQ on the project website", "project_website": "https://cranberrypointenergystorage.com/", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "113", "external_id": "62844", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cranberry Point Energy Storage", "external_id": "62844", "state": "massachusetts", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Cranberry Point Energy Storage LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NA": {"first": {"year": "2023", "month": "5", "entity id": "62733", "entity name": "Cranberry Point Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cranberry Point Energy Storage", "plant state": "MA", "plant id": "62844", "generator id": "NA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62844", "date": "2023-05", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2023-05", "to": "2024-06", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-06", "to": "2025-05", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "5", "entity id": "62733", "entity name": "Cranberry Point Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cranberry Point Energy Storage", "plant state": "MA", "plant id": "62844", "generator id": "NA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62844", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Cranberry Point Energy Storage", "name_short": "Cranberry Point", "owner": "Cranberry Point Energy Storage LLC", "state": "massachusetts", "country": "usa", "lat": "41.896693", "long": "-70.786639", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.896693+-70.786639", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the info about tesla as manufacturer from twitter thread and FAQ on the project website"], "links": ["https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Big Rock Solar Farm", "city": "", "id": "162", "external_id": "64636", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "92JT 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "162", "external_id": "64636", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Big Rock Solar Farm", "external_id": "64636", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "92JT 8me, LLC", "status": "planning", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"92JTB": {"first": {"year": "2022", "month": "12", "entity id": "64244", "entity name": "92JT 8me, LLC", "plant producer type": "IPP", "plant name": "Big Rock Solar Farm", "plant state": "CA", "plant id": "64636", "generator id": "92JTB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64636", "date": "2022-12", "mw": 200}, "first_month": "2021-06", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-12", "to": "2023-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2025-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "64244", "entity name": "92JT 8me, LLC", "plant producer type": "IPP", "plant name": "Big Rock Solar Farm", "plant state": "CA", "plant id": "64636", "generator id": "92JTB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64636", "date": "2025-05", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Big Rock Solar Farm", "name_short": "Big Rock Solar Farm", "owner": "92JT 8me, LLC", "state": "california", "country": "usa", "lat": "41.21907378137597", "long": "-121.1673702129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.21907378137597+-121.1673702129225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaver Creek II", "city": "", "id": "560", "external_id": "65020", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Beaver Creek Wind II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "560", "external_id": "65020", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaver Creek II", "external_id": "65020", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Beaver Creek Wind II, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCW2B": {"first": {"year": "2023", "month": "6", "entity id": "64435", "entity name": "Beaver Creek Wind II, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek II", "plant state": "MT", "plant id": "65020", "generator id": "BCW2B", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65020", "date": "2023-06", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "64435", "entity name": "Beaver Creek Wind II, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek II", "plant state": "MT", "plant id": "65020", "generator id": "BCW2B", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65020", "date": "2025-05", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Beaver Creek II", "name_short": "Beaver Creek II", "owner": "Beaver Creek Wind II, LLC", "state": "montana", "country": "usa", "lat": "48.650815", "long": "-105.60143599999999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.650815+-105.60143599999999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaver Creek III", "city": "", "id": "561", "external_id": "65021", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Beaver Creek Wind III, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "561", "external_id": "65021", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaver Creek III", "external_id": "65021", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Beaver Creek Wind III, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCW3B": {"first": {"year": "2023", "month": "6", "entity id": "64436", "entity name": "Beaver Creek Wind III, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek III", "plant state": "MT", "plant id": "65021", "generator id": "BCW3B", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65021", "date": "2023-06", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "64436", "entity name": "Beaver Creek Wind III, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek III", "plant state": "MT", "plant id": "65021", "generator id": "BCW3B", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65021", "date": "2025-05", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Beaver Creek III", "name_short": "Beaver Creek III", "owner": "Beaver Creek Wind III, LLC", "state": "montana", "country": "usa", "lat": "48.694695413201245", "long": "-105.58638597468608", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.694695413201245+-105.58638597468608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rowdy Creek Solar and BESS", "city": "", "id": "787", "external_id": "65854", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.639763", "long": "-95.58367", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, "internal_id": "787", "external_id": "65854", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rowdy Creek Solar and BESS", "external_id": "65854", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 700, "power_mw": 350, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RDYBS": {"first": {"year": "2024", "month": "5", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Rowdy Creek Solar and BESS", "plant state": "TX", "plant id": "65854", "generator id": "RDYBS", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65854", "date": "2024-05", "mw": 350}, "first_month": "2022-09", "changes": [{"month": "2023-07", "li": [{"name": "date", "from": "2024-05", "to": "2025-05", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Rowdy Creek Solar and BESS", "plant state": "TX", "plant id": "65854", "generator id": "RDYBS", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65854", "date": "2025-05", "mw": 350}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 350, "mwh_is_estimate": true, "mwh": 700, "mwh_estimate": 700, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Rowdy Creek Solar and BESS", "name_short": "Rowdy Creek Solar", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "33.639763", "long": "-95.58367", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.639763+-95.58367", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarproponent.com/projects/#"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oriana Solar LLC", "city": "", "id": "799", "external_id": "65849", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Oriana Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "799", "external_id": "65849", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Oriana Solar LLC", "external_id": "65849", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 122, "power_mw": 61, "owner": "Oriana Solar LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ORIBS": {"first": {"year": "2024", "month": "6", "entity id": "65081", "entity name": "Oriana Solar LLC", "plant producer type": "IPP", "plant name": "Oriana Solar LLC", "plant state": "TX", "plant id": "65849", "generator id": "ORIBS", "net summer capacity (mw)": "61", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65849", "date": "2024-06", "mw": 61}, "first_month": "2022-09", "changes": [{"month": "2023-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-12", "to": "2025-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "65081", "entity name": "Oriana Solar LLC", "plant producer type": "IPP", "plant name": "Oriana Solar LLC", "plant state": "TX", "plant id": "65849", "generator id": "ORIBS", "net summer capacity (mw)": "61", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65849", "date": "2025-05", "mw": 61}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 61, "mwh_is_estimate": true, "mwh": 122, "mwh_estimate": 122, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Oriana Solar LLC", "name_short": "Oriana Solar", "owner": "Oriana Solar LLC", "state": "texas", "country": "usa", "lat": "33.33724557612627", "long": "-94.91393863684043", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.33724557612627+-94.91393863684043", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ash Creek BESS", "city": "", "id": "979", "external_id": "66391", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "612", "power_mw": "306", "customer": "", "owner": "ACTX BESS Project LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "979", "external_id": "66391", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ash Creek BESS", "external_id": "66391", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 612, "power_mw": 306, "owner": "ACTX BESS Project LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2025", "month": "5", "entity id": "65410", "entity name": "ACTX BESS Project LLC", "plant producer type": "IPP", "plant name": "Ash Creek BESS", "plant state": "TX", "plant id": "66391", "generator id": "BESS", "net summer capacity (mw)": "306", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66391", "date": "2025-05", "mw": 306}, "first_month": "2023-04", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "65410", "entity name": "ACTX BESS Project LLC", "plant producer type": "IPP", "plant name": "Ash Creek BESS", "plant state": "TX", "plant id": "66391", "generator id": "BESS", "net summer capacity (mw)": "306", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66391", "date": "2025-05", "mw": 306}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 306, "mwh_is_estimate": true, "mwh": 612, "mwh_estimate": 612, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Ash Creek BESS", "name_short": "Ash Creek", "owner": "ACTX BESS Project LLC", "state": "texas", "country": "usa", "lat": "33.349606255901264", "long": "-94.95198089749223", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.349606255901264+-94.95198089749223", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peregrine BESS 1", "city": "", "id": "990", "external_id": "66301", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "990", "external_id": "66301", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peregrine BESS 1", "external_id": "66301", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PGBS1": {"first": {"year": "2025", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Peregrine BESS 1", "plant state": "TX", "plant id": "66301", "generator id": "PGBS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66301", "date": "2025-05", "mw": 150}, "first_month": "2023-03", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Peregrine BESS 1", "plant state": "TX", "plant id": "66301", "generator id": "PGBS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66301", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Peregrine BESS 1", "name_short": "Peregrine BESS 1", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.453438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.453438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peregrine BESS 2", "city": "", "id": "991", "external_id": "66302", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "991", "external_id": "66302", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peregrine BESS 2", "external_id": "66302", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PGBS2": {"first": {"year": "2025", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Peregrine BESS 2", "plant state": "TX", "plant id": "66302", "generator id": "PGBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66302", "date": "2025-05", "mw": 150}, "first_month": "2023-03", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Peregrine BESS 2", "plant state": "TX", "plant id": "66302", "generator id": "PGBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66302", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Peregrine BESS 2", "name_short": "Peregrine BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.39163256713626", "long": "-95.46555141629162", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.39163256713626+-95.46555141629162", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "MRG Goody Solar Project Hybrid", "city": "", "id": "1003", "external_id": "66390", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "MRG Goody Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1003", "external_id": "66390", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "MRG Goody Solar Project Hybrid", "external_id": "66390", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "MRG Goody Solar Project, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GDYES": {"first": {"year": "2025", "month": "5", "entity id": "65445", "entity name": "MRG Goody Solar Project, LLC", "plant producer type": "IPP", "plant name": "MRG Goody Solar Project Hybrid", "plant state": "TX", "plant id": "66390", "generator id": "GDYES", "net summer capacity (mw)": "50.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66390", "date": "2025-05", "mw": 50}, "first_month": "2023-04", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "65445", "entity name": "MRG Goody Solar Project, LLC", "plant producer type": "IPP", "plant name": "MRG Goody Solar Project Hybrid", "plant state": "TX", "plant id": "66390", "generator id": "GDYES", "net summer capacity (mw)": "50.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66390", "date": "2025-05", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "MRG Goody Solar Project Hybrid", "name_short": "MRG Goody Solar", "owner": "MRG Goody Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.507449121628746", "long": "-95.2346441733487", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.507449121628746+-95.2346441733487", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Indigo Solar & Storage", "city": "", "id": "1063", "external_id": "66891", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "GGS Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1063", "external_id": "66891", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Indigo Solar & Storage", "external_id": "66891", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "GGS Energy LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"245BS": {"first": {"year": "2025", "month": "5", "entity id": "65814", "entity name": "GGS Energy LLC", "plant producer type": "IPP", "plant name": "Indigo Solar & Storage", "plant state": "TX", "plant id": "66891", "generator id": "245BS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66891", "date": "2025-05", "mw": 50}, "first_month": "2023-09", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "65814", "entity name": "GGS Energy LLC", "plant producer type": "IPP", "plant name": "Indigo Solar & Storage", "plant state": "TX", "plant id": "66891", "generator id": "245BS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66891", "date": "2025-05", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Indigo Solar & Storage", "name_short": "Indigo Solar &", "owner": "GGS Energy LLC", "state": "texas", "country": "usa", "lat": "33.60453116095374", "long": "-95.1641099430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.60453116095374+-95.1641099430736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Harquahala 2", "city": "", "id": "1330", "external_id": "67474", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Copia Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1330", "external_id": "67474", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Harquahala 2", "external_id": "67474", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Copia Power", "status": "construction", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2025", "month": "5", "entity id": "66217", "entity name": "Copia Power", "plant producer type": "IPP", "plant name": "Harquahala 2", "plant state": "AZ", "plant id": "67474", "generator id": "BESS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67474", "date": "2025-05", "mw": 150}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "66217", "entity name": "Copia Power", "plant producer type": "IPP", "plant name": "Harquahala 2", "plant state": "AZ", "plant id": "67474", "generator id": "BESS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67474", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Harquahala 2", "name_short": "Harquahala 2", "owner": "Copia Power", "state": "arizona", "country": "usa", "lat": "36.478429", "long": "-109.945254", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.478429+-109.945254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scatter Wash 2", "city": "", "id": "1331", "external_id": "67455", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "170", "power_mw": "85", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1331", "external_id": "67455", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Scatter Wash 2", "external_id": "67455", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 170, "power_mw": 85, "owner": "Strata Manager, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SW2": {"first": {"year": "2025", "month": "5", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Scatter Wash 2", "plant state": "AZ", "plant id": "67455", "generator id": "SW2", "net summer capacity (mw)": "85", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67455", "date": "2025-05", "mw": 85}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Scatter Wash 2", "plant state": "AZ", "plant id": "67455", "generator id": "SW2", "net summer capacity (mw)": "85", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67455", "date": "2025-05", "mw": 85}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 85, "mwh_is_estimate": true, "mwh": 170, "mwh_estimate": 170, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Scatter Wash 2", "name_short": "Scatter Wash 2", "owner": "Strata Manager, LLC", "state": "arizona", "country": "usa", "lat": "36.453089606461255", "long": "-109.9632406343362", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.453089606461255+-109.9632406343362", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carne Energy Storage, LLC", "city": "", "id": "1348", "external_id": "67230", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "260", "power_mw": "130", "customer": "", "owner": "Carne Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1348", "external_id": "67230", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Carne Energy Storage, LLC", "external_id": "67230", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 260, "power_mw": 130, "owner": "Carne Energy Storage, LLC", "status": "planning", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CS": {"first": {"year": "2025", "month": "5", "entity id": "66107", "entity name": "Carne Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Carne Energy Storage, LLC", "plant state": "NM", "plant id": "67230", "generator id": "CS", "net summer capacity (mw)": "130", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67230", "date": "2025-05", "mw": 130}, "first_month": "2024-03", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "66107", "entity name": "Carne Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Carne Energy Storage, LLC", "plant state": "NM", "plant id": "67230", "generator id": "CS", "net summer capacity (mw)": "130", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67230", "date": "2025-05", "mw": 130}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 130, "mwh_is_estimate": true, "mwh": 260, "mwh_estimate": 260, "status": "planning", "status_class": "", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Carne Energy Storage, LLC", "name_short": "Carne Energy Storage", "owner": "Carne Energy Storage, LLC", "state": "new mexico", "country": "usa", "lat": "36.60033402458687", "long": "-103.88508735055998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.60033402458687+-103.88508735055998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Willow Energy Storage", "city": "", "id": "1364", "external_id": "67598", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Desert Willow Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1364", "external_id": "67598", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Willow Energy Storage", "external_id": "67598", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Desert Willow Energy Storage", "status": "construction", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DWES": {"first": {"year": "2025", "month": "5", "entity id": "66292", "entity name": "Desert Willow Energy Storage", "plant producer type": "IPP", "plant name": "Desert Willow Energy Storage", "plant state": "TX", "plant id": "67598", "generator id": "DWES", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67598", "date": "2025-05", "mw": 150}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "66292", "entity name": "Desert Willow Energy Storage", "plant producer type": "IPP", "plant name": "Desert Willow Energy Storage", "plant state": "TX", "plant id": "67598", "generator id": "DWES", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67598", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Desert Willow Energy Storage", "name_short": "Desert Willow", "owner": "Desert Willow Energy Storage", "state": "texas", "country": "usa", "lat": "33.65187375538939", "long": "-95.20916246517001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65187375538939+-95.20916246517001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Nighthawk Energy Storage, LLC", "city": "", "id": "774", "external_id": "65889", "state": "california", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "600", "power_mw": "300", "customer": "arevon", "owner": "Nighthawk Energy Storage, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.957486", "long": "-117.038749", "coords_hint": "3", "use_case": "", "notes": "got the coords from arevon website, but probably not the exact location yet", "project_website": "https://arevonenergy.com/location/nighthawk/", "link1": "https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/", "link2": "", "link3": "", "link4": ""}, "internal_id": "774", "external_id": "65889", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Nighthawk Energy Storage, LLC", "external_id": "65889", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Nighthawk Energy Storage, LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "6", "entity id": "65088", "entity name": "Nighthawk Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Nighthawk Energy Storage, LLC", "plant state": "CA", "plant id": "65889", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65889", "date": "2024-06", "mw": 300}, "first_month": "2022-09", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-02", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-02", "to": "2025-04", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "4", "entity id": "65088", "entity name": "Nighthawk Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Nighthawk Energy Storage, LLC", "plant state": "CA", "plant id": "65889", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65889", "date": "2025-04", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": false, "mwh": 1200, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Nighthawk Energy Storage, LLC", "name_short": "Nighthawk Energy Storage", "owner": "Nighthawk Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.957486", "long": "-117.038749", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.957486+-117.038749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the coords from arevon website, but probably not the exact location yet"], "links": ["https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "MacDill Storage", "city": "", "id": "1043", "external_id": "66869", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1043", "external_id": "66869", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "South Tampa Energy Storage", "external_id": "66869", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Tampa Electric Co", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2025", "month": "4", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "MacDill Storage", "plant state": "FL", "plant id": "66869", "generator id": "BESS1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66869", "date": "2025-04", "mw": 20}, "first_month": "2023-09", "changes": [{"month": "2024-03", "li": [{"name": "plant name", "from": "MacDill Storage", "to": "South Tampa Energy Storage", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "4", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "South Tampa Energy Storage", "plant state": "FL", "plant id": "66869", "generator id": "BESS1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66869", "date": "2025-04", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "South Tampa Energy Storage", "name_short": "South Tampa", "owner": "Tampa Electric Co", "state": "florida", "country": "usa", "lat": "30.25010048117874", "long": "-82.0617053531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.25010048117874+-82.0617053531653", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scatter Wash BESS", "city": "Phoenix", "id": "1322", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "1020", "estimate_mwh": "", "power_mw": "255", "customer": "", "owner": "", "developer": "Strata Clean Energy", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "500", "cost_currency": "USD", "cost_incl_solar": "", "lat": "33.685402", "long": "-112.125062", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1748500029197726146", "link2": "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/", "link3": "", "link4": ""}, "internal_id": "1322", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 255, "mwh_is_estimate": false, "mwh": 1020, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Scatter Wash BESS", "name_short": "Scatter Wash", "owner": "", "state": "arizona", "country": "usa", "lat": "33.685402", "long": "-112.125062", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.685402+-112.125062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1748500029197726146", "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Scatter Wash 1", "city": "", "id": "1329", "external_id": "67454", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "340", "power_mw": "170", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1329", "external_id": "67454", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Scatter Wash 1", "external_id": "67454", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 340, "power_mw": 170, "owner": "Strata Manager, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SW1": {"first": {"year": "2025", "month": "4", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Scatter Wash 1", "plant state": "AZ", "plant id": "67454", "generator id": "SW1", "net summer capacity (mw)": "170", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67454", "date": "2025-04", "mw": 170}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "4", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Scatter Wash 1", "plant state": "AZ", "plant id": "67454", "generator id": "SW1", "net summer capacity (mw)": "170", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67454", "date": "2025-04", "mw": 170}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 170, "mwh_is_estimate": true, "mwh": 340, "mwh_estimate": 340, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Scatter Wash 1", "name_short": "Scatter Wash 1", "owner": "Strata Manager, LLC", "state": "arizona", "country": "usa", "lat": "36.55197504466123", "long": "-110.11160545087824", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.55197504466123+-110.11160545087824", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eland Solar & Storage Center, Phase 2 Hybrid", "city": "", "id": "164", "external_id": "61169", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "69SV 8me LLC", "developer": "Arevon", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "150", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "35.198008", "long": "-117.994", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1760848348607594844", "link2": "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "link3": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link4": ""}, "internal_id": "164", "external_id": "61169", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eland Solar & Storage Center, Phase 2 Hybrid", "external_id": "61169", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "69SV 8me LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61169": {"first": {"year": "2023", "month": "7", "entity id": "60798", "entity name": "69SV 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 2 Hybrid", "plant state": "CA", "plant id": "61169", "generator id": "61169", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61169", "date": "2023-07", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-11", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-11", "to": "2025-03", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "3", "entity id": "60798", "entity name": "69SV 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 2 Hybrid", "plant state": "CA", "plant id": "61169", "generator id": "61169", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61169", "date": "2025-03", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Eland Solar & Storage Center, Phase 2 Hybrid", "name_short": "Eland Solar & Storage Center, Phase...", "owner": "69SV 8me LLC", "state": "california", "country": "usa", "lat": "35.198008", "long": "-117.994", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.198008+-117.994", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1760848348607594844", "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "https://x.com/Tesla_Megapack/status/1794120454883659833"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ridgely Energy Farm", "city": "", "id": "684", "external_id": "65445", "state": "tennessee", "country": "usa", "capacity_mwh": "", "estimate_mwh": "138", "power_mw": "69", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "684", "external_id": "65445", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ridgely Energy Farm", "external_id": "65445", "state": "tennessee", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RBESS": {"first": {"year": "2024", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Ridgely Energy Farm", "plant state": "TN", "plant id": "65445", "generator id": "RBESS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65445", "date": "2024-12", "mw": 50}, "first_month": "2023-05", "changes": [{"month": "2024-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-12", "to": "2025-03", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "3", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Ridgely Energy Farm", "plant state": "TN", "plant id": "65445", "generator id": "RBESS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65445", "date": "2025-03", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Ridgely Energy Farm", "name_short": "Ridgely Energy Farm", "owner": "Leeward Asset Management, LLC", "state": "tennessee", "country": "usa", "lat": "36.55150401604119", "long": "-83.00609678539502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.55150401604119+-83.00609678539502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tidwell Prairie Storage 1", "city": "", "id": "983", "external_id": "66337", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Tidwell Prairie", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "983", "external_id": "66337", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Tidwell Prairie Storage 1", "external_id": "66337", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Tidwell Prairie", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SGES1": {"first": {"year": "2024", "month": "12", "entity id": "65427", "entity name": "Tidwell Prairie", "plant producer type": "IPP", "plant name": "Tidwell Prairie Storage 1", "plant state": "TX", "plant id": "66337", "generator id": "SGES1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66337", "date": "2024-12", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-12", "to": "2025-03", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "3", "entity id": "65427", "entity name": "Tidwell Prairie", "plant producer type": "IPP", "plant name": "Tidwell Prairie Storage 1", "plant state": "TX", "plant id": "66337", "generator id": "SGES1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66337", "date": "2025-03", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Tidwell Prairie Storage 1", "name_short": "Tidwell Prairie Storage 1", "owner": "Tidwell Prairie", "state": "texas", "country": "usa", "lat": "33.63689184072874", "long": "-95.1405985329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.63689184072874+-95.1405985329819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bexar ESS", "city": "", "id": "998", "external_id": "66400", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "998", "external_id": "66400", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bexar ESS", "external_id": "66400", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Bexar ESS, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OCBEX": {"first": {"year": "2024", "month": "8", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "Bexar ESS", "plant state": "TX", "plant id": "66400", "generator id": "OCBEX", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66400", "date": "2024-08", "mw": 100}, "first_month": "2023-04", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2024-08", "to": "2025-03", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "entity id", "from": "58489", "to": "66064", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "OCI Solar Power", "to": "Bexar ESS, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "3", "entity id": "66064", "entity name": "Bexar ESS, LLC", "plant producer type": "IPP", "plant name": "Bexar ESS", "plant state": "TX", "plant id": "66400", "generator id": "OCBEX", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66400", "date": "2025-03", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Bexar ESS", "name_short": "Bexar ESS", "owner": "Bexar ESS, LLC", "state": "texas", "country": "usa", "lat": "33.244802450183876", "long": "-94.98542795000252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.244802450183876+-94.98542795000252", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vermillion Rise Solar", "city": "", "id": "1024", "external_id": "65935", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Vermillion Rise Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1024", "external_id": "65935", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vermillion Rise Solar", "external_id": "65935", "state": "indiana", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Vermillion Rise Solar, LLC", "status": "planning", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT": {"first": {"year": "2025", "month": "3", "entity id": "65104", "entity name": "Vermillion Rise Solar, LLC", "plant producer type": "IPP", "plant name": "Vermillion Rise Solar", "plant state": "IN", "plant id": "65935", "generator id": "BAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65935", "date": "2025-03", "mw": 40}, "first_month": "2023-06", "changes": [], "current": {"year": "2025", "month": "3", "entity id": "65104", "entity name": "Vermillion Rise Solar, LLC", "plant producer type": "IPP", "plant name": "Vermillion Rise Solar", "plant state": "IN", "plant id": "65935", "generator id": "BAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65935", "date": "2025-03", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Vermillion Rise Solar", "name_short": "Vermillion Rise Solar", "owner": "Vermillion Rise Solar, LLC", "state": "indiana", "country": "usa", "lat": "41.46687023408578", "long": "-85.29278382472", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.46687023408578+-85.29278382472", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wimauma Storage", "city": "", "id": "1023", "external_id": "66640", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1023", "external_id": "66640", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wimauma Storage", "external_id": "66640", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Tampa Electric Co", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-05", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2025", "month": "2", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Wimauma Storage", "plant state": "FL", "plant id": "66640", "generator id": "BESS1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66640", "date": "2025-02", "mw": 40}, "first_month": "2023-07", "changes": [{"month": "2024-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "2", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Wimauma Storage", "plant state": "FL", "plant id": "66640", "generator id": "BESS1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66640", "date": "2025-02", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-05"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-05", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "go_live": "0 ~ 2025-02", "go_live_year_int": 2025, "name": "Wimauma Storage", "name_short": "Wimauma", "owner": "Tampa Electric Co", "state": "florida", "country": "usa", "lat": "30.217739801403745", "long": "-82.085216763257", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.217739801403745+-82.085216763257", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Northern Orchard Solar PV, LLC", "city": "", "id": "1179", "external_id": "67039", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "184", "power_mw": "92", "customer": "", "owner": "Northern Orchard Solar PV, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1179", "external_id": "67039", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Northern Orchard Solar PV, LLC", "external_id": "67039", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 184, "power_mw": 92, "owner": "Northern Orchard Solar PV, LLC", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NOBAT": {"first": {"year": "2024", "month": "3", "entity id": "65947", "entity name": "Northern Orchard Solar PV, LLC", "plant producer type": "IPP", "plant name": "Northern Orchard Solar PV, LLC", "plant state": "CA", "plant id": "67039", "generator id": "NOBAT", "net summer capacity (mw)": "92", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67039", "date": "2024-03", "mw": 92}, "first_month": "2023-12", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-12", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2025-02", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "2", "entity id": "65947", "entity name": "Northern Orchard Solar PV, LLC", "plant producer type": "IPP", "plant name": "Northern Orchard Solar PV, LLC", "plant state": "CA", "plant id": "67039", "generator id": "NOBAT", "net summer capacity (mw)": "92", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67039", "date": "2025-02", "mw": 92}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 92, "mwh_is_estimate": true, "mwh": 184, "mwh_estimate": 184, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "go_live": "0 ~ 2025-02", "go_live_year_int": 2025, "name": "Northern Orchard Solar PV, LLC", "name_short": "Northern Orchard Solar PV", "owner": "Northern Orchard Solar PV, LLC", "state": "california", "country": "usa", "lat": "41.01822925590127", "long": "-120.97859189749224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01822925590127+-120.97859189749224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McFarland C", "city": "", "id": "1328", "external_id": "67498", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1328", "external_id": "67498", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McFarland C", "external_id": "67498", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MCFRC": {"first": {"year": "2025", "month": "2", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland C", "plant state": "AZ", "plant id": "67498", "generator id": "MCFRC", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67498", "date": "2025-02", "mw": 185}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "2", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland C", "plant state": "AZ", "plant id": "67498", "generator id": "MCFRC", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67498", "date": "2025-02", "mw": 185}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": true, "mwh": 370, "mwh_estimate": 370, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "go_live": "0 ~ 2025-02", "go_live_year_int": 2025, "name": "McFarland C", "name_short": "McFarland C", "owner": "AES Clean Energy", "state": "arizona", "country": "usa", "lat": "36.60539061449517", "long": "-110.060001670785", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.60539061449517+-110.060001670785", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aratina Solar Center 2", "city": "", "id": "161", "external_id": "64215", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "45MG 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "161", "external_id": "64215", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Aratina Solar Center 2", "external_id": "64215", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "45MG 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"45MGB": {"first": {"year": "2023", "month": "6", "entity id": "63825", "entity name": "45MG 8me LLC", "plant producer type": "IPP", "plant name": "Aratina Solar Center 2", "plant state": "CA", "plant id": "64215", "generator id": "45MGB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64215", "date": "2023-06", "mw": 200}, "first_month": "2021-01", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2023-06", "to": "2024-06", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-03", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2025-03", "to": "2025-01", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "63825", "entity name": "45MG 8me LLC", "plant producer type": "IPP", "plant name": "Aratina Solar Center 2", "plant state": "CA", "plant id": "64215", "generator id": "45MGB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64215", "date": "2025-01", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "Aratina Solar Center 2", "name_short": "Aratina Solar Center 2", "owner": "45MG 8me LLC", "state": "california", "country": "usa", "lat": "41.16655741320125", "long": "-121.16499897468609", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.16655741320125+-121.16499897468609", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES Waiawa Phase 2 Solar", "city": "", "id": "857", "external_id": "66066", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "857", "external_id": "66066", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES Waiawa Phase 2 Solar", "external_id": "66066", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "AES Distributed Energy", "status": "construction", "date_first_heard": "2022-12", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WAIBA": {"first": {"year": "2023", "month": "12", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Waiawa Phase 2 Solar", "plant state": "HI", "plant id": "66066", "generator id": "WAIBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66066", "date": "2023-12", "mw": 30}, "first_month": "2022-12", "changes": [{"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2024-10", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2024-10", "to": "2024-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-11", "to": "2025-01", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Waiawa Phase 2 Solar", "plant state": "HI", "plant id": "66066", "generator id": "WAIBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66066", "date": "2025-01", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2022-12", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-12", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "AES Waiawa Phase 2 Solar", "name_short": "AES Waiawa Phase 2 Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.406354683428763", "long": "-155.3642375459177", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.406354683428763+-155.3642375459177", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peregrine", "city": "San Diego", "id": "865", "external_id": "66286", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.692183", "long": "-117.13667", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/peregrine/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/", "link2": "", "link3": "", "link4": ""}, "internal_id": "865", "external_id": "66286", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peregrine Energy Storage LLC", "external_id": "66286", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Peregrine Energy Storage, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PERE1": {"first": {"year": "2024", "month": "8", "entity id": "65398", "entity name": "Peregrine Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Peregrine Energy Storage LLC", "plant state": "CA", "plant id": "66286", "generator id": "PERE1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66286", "date": "2024-08", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2023-10", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-08", "to": "2024-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2024-09", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-09", "to": "2024-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-10", "to": "2025-01", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "65398", "entity name": "Peregrine Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Peregrine Energy Storage LLC", "plant state": "CA", "plant id": "66286", "generator id": "PERE1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66286", "date": "2025-01", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "Peregrine Energy Storage LLC", "name_short": "Peregrine Energy Storage", "owner": "Peregrine Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.692183", "long": "-117.13667", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.692183+-117.13667", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Lake Mabel Storage", "city": "", "id": "1022", "external_id": "66641", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1022", "external_id": "66641", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lake Mabel Storage", "external_id": "66641", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Tampa Electric Co", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2024", "month": "12", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Lake Mabel Storage", "plant state": "FL", "plant id": "66641", "generator id": "BESS1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66641", "date": "2024-12", "mw": 40}, "first_month": "2023-07", "changes": [{"month": "2024-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-12", "to": "2025-01", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Lake Mabel Storage", "plant state": "FL", "plant id": "66641", "generator id": "BESS1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66641", "date": "2025-01", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "Lake Mabel Storage", "name_short": "Lake Mabel", "owner": "Tampa Electric Co", "state": "florida", "country": "usa", "lat": "30.181357961192568", "long": "-82.0795645724725", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.181357961192568+-82.0795645724725", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards", "city": "Edwards", "id": "98", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.413627", "long": "-88.058471", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, "internal_id": "98", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 37, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "Edwards", "name_short": "Edwards", "owner": "Vistra Corp", "state": "illinois", "country": "usa", "lat": "38.413627", "long": "-88.058471", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.413627+-88.058471", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["the last of 8 projects will be done in 2025, so most likely earlier"], "links": ["https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Havana", "city": "Havana", "id": "99", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.279711", "long": "-90.079133", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, "internal_id": "99", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 37, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "Havana", "name_short": "Havana", "owner": "Vistra Corp", "state": "illinois", "country": "usa", "lat": "40.279711", "long": "-90.079133", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.279711+-90.079133", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["the last of 8 projects will be done in 2025, so most likely earlier"], "links": ["https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "EEI/Joppa", "city": "Joppa", "id": "100", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.211346", "long": "-88.859049", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, "internal_id": "100", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 37, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "EEI/Joppa", "name_short": "EEI/Joppa", "owner": "Vistra Corp", "state": "illinois", "country": "usa", "lat": "37.211346", "long": "-88.859049", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:37.211346+-88.859049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["the last of 8 projects will be done in 2025, so most likely earlier"], "links": ["https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oneida Energy Storage Project", "city": "Haldimand County", "id": "866", "external_id": "", "state": "ontario", "country": "canada", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "NRStor", "owner": "Northland Power ** SNGRDC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "42.886859", "long": "-80.12224", "coords_hint": "3", "use_case": "", "notes": "The article mentions Jarvis in Haldimand County", "project_website": "https://www.snfuture.com/projects/oneida-energy-storage/", "link1": "https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/", "link2": "", "link3": "", "link4": ""}, "internal_id": "866", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "Oneida Energy Storage Project", "name_short": "Oneida", "owner": "Northland Power ** SNGRDC", "state": "ontario", "country": "canada", "lat": "42.886859", "long": "-80.12224", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.886859+-80.12224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["The article mentions Jarvis in Haldimand County"], "links": ["https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hot Pot", "city": "Humboldt County", "id": "107", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "1120", "estimate_mwh": "", "power_mw": "280", "customer": "", "owner": "NV Energy", "developer": "Primergy Solar (Quinbrook)", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.886191", "long": "-117.104592", "coords_hint": "0", "use_case": "350MW solar farm support", "notes": "in the planning doc the project name also includes iron pot 2 solar plant", "project_website": "", "link1": "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/2013178/510", "link3": "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/", "link4": ""}, "internal_id": "107", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 280, "mwh_is_estimate": false, "mwh": 1120, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2024Q4", "month_disappeared": "", "go_live": "0 ~ 2024Q4", "go_live_year_int": 2024, "name": "Hot Pot", "name_short": "Hot Pot", "owner": "NV Energy", "state": "nevada", "country": "usa", "lat": "40.886191", "long": "-117.104592", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.886191+-117.104592", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["in the planning doc the project name also includes iron pot 2 solar plant"], "links": ["https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "https://eplanning.blm.gov/eplanning-ui/project/2013178/510", "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Collie Battery Stage 1", "city": "", "id": "1174", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "877", "estimate_mwh": "", "power_mw": "219", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31604", "long": "116.289605", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "link2": "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/", "link3": "", "link4": ""}, "internal_id": "1174", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 219, "mwh_is_estimate": false, "mwh": 877, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "month_disappeared": "", "go_live": "0 ~ 2024Q4", "go_live_year_int": 2024, "name": "Collie Battery Stage 1", "name_short": "Collie Battery Stage 1", "owner": "neoen", "state": "western australia", "country": "australia", "lat": "-33.31604", "long": "116.289605", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.31604+116.289605", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 224, "notes_split": [""], "links": ["https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Rye Common", "city": "Farnham", "id": "410", "external_id": "7737", "state": "hampshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.25011", "long": "-0.87423", "coords_hint": "1", "use_case": "", "notes": "Phase II is 200m north-east of Phase I", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "link4": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"}, "internal_id": "410", "external_id": "7737", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rye Common", "external_id": "7737", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pulse Clean Energy", "status": "planning", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.248047", "long": "-0.87689", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7737", "Record Last Updated (dd/mm/yyyy)": "06/10/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rye Common", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Address": "Street Record, Rye Common Lane, Crondall, Farnham, Surrey", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DD", "X-coordinate": "478485", "Y-coordinate": "150474", "Planning Authority": "Hart District Council", "Planning Application Reference": "20/00651/FUL", "Appeal Reference": "PP-08735792", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "01/05/2020", "Appeal Lodged": "22/02/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "28/09/2021", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.248047", "long": "-0.87689", "status": "planning", "mw": 49, "ext_id": "7737"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Street Record, Rye Common Lane, Crondall, Farnham, Surrey", "to": "Street Record, Rye Common Lane, Crondall, Farnham, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Granted", "from": "", "to": "28/09/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/10/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/03/2020", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Harmony Energy Storage", "to": "Pulse Clean Energy", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7737", "Record Last Updated (dd/mm/yyyy)": "12/03/2020", "Operator (or Applicant)": "Pulse Clean Energy", "Site Name": "Rye Common", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7028", "Address": "Street Record, Rye Common Lane, Crondall, Farnham, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DD", "X-coordinate": "478485", "Y-coordinate": "150474", "Planning Authority": "Hart District Council", "Planning Application Reference": "20/00651/FUL", "Appeal Reference": "PP-08735792", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "01/05/2020", "Appeal Lodged": "22/02/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "28/09/2021", "Planning Permission Granted": "28/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.248047", "long": "-0.87689", "status": "planning", "mw": 49, "ext_id": "7737"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "month_disappeared": "", "go_live": "0 ~ 2024Q3", "go_live_year_int": 2024, "name": "Rye Common", "name_short": "Rye Common", "owner": "Pulse Clean Energy", "state": "south east", "country": "uk", "lat": "51.248047", "long": "-0.87689", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.248047+-0.87689", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Phase II is 200m north-east of Phase I"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hawthorn Pit", "city": "Murton", "id": "849", "external_id": "", "state": "county durham", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99.8", "power_mw": "49.9", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.80552", "long": "-1.40646", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, "internal_id": "849", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 49, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "month_disappeared": "", "go_live": "0 ~ 2024Q2", "go_live_year_int": 2024, "name": "Hawthorn Pit", "name_short": "Hawthorn Pit", "owner": "Harmony Energy Income Trust", "state": "county durham", "country": "uk", "lat": "54.80552", "long": "-1.40646", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.80552+-1.40646", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Failed Oct 2022 C share placement puts construction in doubt"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wormald Green", "city": "Harrogate", "id": "848", "external_id": "", "state": "yorkshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.07548", "long": "-1.52312", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, "internal_id": "848", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 33, "mwh_is_estimate": true, "mwh": 66, "mwh_estimate": 66, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "month_disappeared": "", "go_live": "0 ~ 2024Q1", "go_live_year_int": 2024, "name": "Wormald Green", "name_short": "Wormald Green", "owner": "Harmony Energy Income Trust", "state": "yorkshire", "country": "uk", "lat": "54.07548", "long": "-1.52312", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.07548+-1.52312", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Failed Oct 2022 C share placement puts construction in doubt"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Rexford Solar Farm", "city": "Tulare County", "id": "61", "external_id": "64633", "state": "california", "country": "usa", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "180", "customer": "8minute / Clean Power Alliance", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-11", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.853593", "long": "-119.051695", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "already a large solar farm visible on google maps, but the planning doc shows it will be on new locations between existing solar farm", "project_website": "https://www.8minute.com/energy-storage/", "link1": "https://www.energy-storage.news/california-community-energy-group-signs-ppa-for-400mw-540mwh-solar-plus-storage-plant/", "link2": "https://tularecounty.ca.gov/rma/index.cfm/planning-building/environmental-planning/environmental-impact-reports/rexford-solar-project-psp-19-073/", "link3": "", "link4": ""}, "internal_id": "61", "external_id": "64633", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rexford Solar Farm", "external_id": "64633", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 480, "power_mw": 240, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2021-06", "start_construction": "2023-07", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"20SDB": {"first": {"year": "2023", "month": "4", "entity id": "64247", "entity name": "20SD 8me LLC", "plant producer type": "IPP", "plant name": "Rexford Solar Farm", "plant state": "CA", "plant id": "64633", "generator id": "20SDB", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64633", "date": "2023-04", "mw": 300}, "first_month": "2021-06", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2023-04", "to": "2024-04", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-04", "to": "2024-12", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "64247", "to": "64904", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "20SD 8me LLC", "to": "AES Clean Energy", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 300, "to": 240, "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Rexford Solar Farm", "plant state": "CA", "plant id": "64633", "generator id": "20SDB", "net summer capacity (mw)": "240", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64633", "date": "2024-12", "mw": 240}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 240, "mwh_is_estimate": false, "mwh": 540, "mwh_estimate": 480, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-06", "start_construction": "2023-07", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Rexford Solar Farm", "name_short": "Rexford Solar Farm", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "35.853593", "long": "-119.051695", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.853593+-119.051695", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["already a large solar farm visible on google maps, but the planning doc shows it will be on new locations between existing solar farm"], "links": ["https://www.energy-storage.news/california-community-energy-group-signs-ppa-for-400mw-540mwh-solar-plus-storage-plant/", "https://tularecounty.ca.gov/rma/index.cfm/planning-building/environmental-planning/environmental-impact-reports/rexford-solar-project-psp-19-073/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Atlas", "city": "", "id": "145", "external_id": "63798", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "145", "external_id": "63798", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Atlas", "external_id": "63798", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "174 Power Global Corp.", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ATLB1": {"first": {"year": "2022", "month": "12", "entity id": "61222", "entity name": "174 Power Global Corp.", "plant producer type": "IPP", "plant name": "Atlas", "plant state": "AZ", "plant id": "63798", "generator id": "ATLB1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63798", "date": "2022-12", "mw": 300}, "first_month": "2020-09", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-12", "to": "2023-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "61222", "entity name": "174 Power Global Corp.", "plant producer type": "IPP", "plant name": "Atlas", "plant state": "AZ", "plant id": "63798", "generator id": "ATLB1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63798", "date": "2024-12", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Atlas", "name_short": "Atlas", "owner": "174 Power Global Corp.", "state": "arizona", "country": "usa", "lat": "36.668428999999996", "long": "-109.885254", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.668428999999996+-109.885254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pure Hedge LLC", "city": "", "id": "207", "external_id": "50736", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Pure Hedge LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "207", "external_id": "50736", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pure Hedge LLC", "external_id": "50736", "state": "connecticut", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Pure Hedge LLC", "status": "construction", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FSS13": {"first": {"year": "2021", "month": "9", "entity id": "63599", "entity name": "Pure Hedge LLC", "plant producer type": "IPP", "plant name": "Pure Hedge LLC", "plant state": "CT", "plant id": "50736", "generator id": "FSS13", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "50736", "date": "2021-09", "mw": 20}, "first_month": "2021-03", "changes": [{"month": "2021-05", "li": [{"name": "date", "from": "2021-09", "to": "2022-01", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-01", "to": "2023-01", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2023-01", "to": "2024-12", "extra": "delayed by 23 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "63599", "entity name": "Pure Hedge LLC", "plant producer type": "IPP", "plant name": "Pure Hedge LLC", "plant state": "CT", "plant id": "50736", "generator id": "FSS13", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "50736", "date": "2024-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Pure Hedge LLC", "name_short": "Pure Hedge", "owner": "Pure Hedge LLC", "state": "connecticut", "country": "usa", "lat": "42.02877361713374", "long": "-72.12237892885304", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.02877361713374+-72.12237892885304", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barbers Point Solar, LLC", "city": "", "id": "217", "external_id": "64094", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Barbers Point Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "217", "external_id": "64094", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Barbers Point Solar, LLC", "external_id": "64094", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Barbers Point Solar, LLC", "status": "planning", "date_first_heard": "2020-11", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BPBA": {"first": {"year": "2023", "month": "12", "entity id": "63702", "entity name": "Barbers Point Solar, LLC", "plant producer type": "IPP", "plant name": "Barbers Point Solar, LLC", "plant state": "HI", "plant id": "64094", "generator id": "BPBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64094", "date": "2023-12", "mw": 15}, "first_month": "2020-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "63702", "entity name": "Barbers Point Solar, LLC", "plant producer type": "IPP", "plant name": "Barbers Point Solar, LLC", "plant state": "HI", "plant id": "64094", "generator id": "BPBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64094", "date": "2024-12", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2020-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2020-11", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Barbers Point Solar, LLC", "name_short": "Barbers Point Solar", "owner": "Barbers Point Solar, LLC", "state": "hawaii", "country": "usa", "lat": "19.47107604297876", "long": "-155.4112603661011", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.47107604297876+-155.4112603661011", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Portland ESS, LLC", "city": "", "id": "221", "external_id": "64616", "state": "maine", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "South Portland ESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "221", "external_id": "64616", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "South Portland ESS, LLC", "external_id": "64616", "state": "maine", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "South Portland ESS, LLC", "status": "planning", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "1", "entity id": "64233", "entity name": "South Portland ESS, LLC", "plant producer type": "IPP", "plant name": "South Portland ESS, LLC", "plant state": "ME", "plant id": "64616", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64616", "date": "2023-01", "mw": 10}, "first_month": "2021-06", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-06", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2024-02", "to": "2024-12", "extra": "delayed by 10 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64233", "entity name": "South Portland ESS, LLC", "plant producer type": "IPP", "plant name": "South Portland ESS, LLC", "plant state": "ME", "plant id": "64616", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64616", "date": "2024-12", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "South Portland ESS, LLC", "name_short": "South Portland ESS", "owner": "South Portland ESS, LLC", "state": "maine", "country": "usa", "lat": "45.15652305365124", "long": "-69.2043404959897", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:45.15652305365124+-69.2043404959897", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vonore Battery Energy Storage System", "city": "", "id": "240", "external_id": "64255", "state": "tennessee", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Tennessee Valley Authority", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "240", "external_id": "64255", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vonore Battery Energy Storage System", "external_id": "64255", "state": "tennessee", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Tennessee Valley Authority", "status": "construction", "date_first_heard": "2021-01", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"VBESS": {"first": {"year": "2022", "month": "7", "entity id": "18642", "entity name": "Tennessee Valley Authority", "plant producer type": "Electric Utility", "plant name": "Vonore Battery Energy Storage System", "plant state": "TN", "plant id": "64255", "generator id": "VBESS", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64255", "date": "2022-07", "mw": 20}, "first_month": "2021-01", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-07", "to": "2023-08", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-08", "to": "2023-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-07", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-07", "to": "2024-12", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "18642", "entity name": "Tennessee Valley Authority", "plant producer type": "Electric Utility", "plant name": "Vonore Battery Energy Storage System", "plant state": "TN", "plant id": "64255", "generator id": "VBESS", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64255", "date": "2024-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-01", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Vonore Battery Energy Storage System", "name_short": "Vonore Battery", "owner": "Tennessee Valley Authority", "state": "tennessee", "country": "usa", "lat": "36.315642", "long": "-83.002733", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.315642+-83.002733", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scarlet Solar (CA)", "city": "", "id": "551", "external_id": "64908", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "EDP Renewables North America LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "551", "external_id": "64908", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Scarlet Solar (CA)", "external_id": "64908", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "EDP Renewables North America LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "2023-04", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2022", "month": "12", "entity id": "61785", "entity name": "EDP Renewables North America LLC", "plant producer type": "IPP", "plant name": "Scarlet Solar (CA)", "plant state": "CA", "plant id": "64908", "generator id": "GEN02", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64908", "date": "2022-12", "mw": 40}, "first_month": "2021-11", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2022-12", "to": "2023-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2023-03", "to": "2023-08", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-08", "to": "2024-12", "extra": "delayed by 16 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2023-12", "extra": "accelerated by 12 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2024-03", "to": "2024-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "61785", "entity name": "EDP Renewables North America LLC", "plant producer type": "IPP", "plant name": "Scarlet Solar (CA)", "plant state": "CA", "plant id": "64908", "generator id": "GEN02", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64908", "date": "2024-12", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "2023-04", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Scarlet Solar (CA)", "name_short": "Scarlet Solar (CA)", "owner": "EDP Renewables North America LLC", "state": "california", "country": "usa", "lat": "41.08497692668626", "long": "-121.416077894988", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.08497692668626+-121.416077894988", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "ENGIE Solidago Solar Project - Hybrid", "city": "", "id": "573", "external_id": "65304", "state": "delaware", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "ENGIE Solidago Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "573", "external_id": "65304", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "ENGIE Solidago Solar Project - Hybrid", "external_id": "65304", "state": "delaware", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "ENGIE Solidago Solar LLC", "status": "planning", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "5", "entity id": "64609", "entity name": "ENGIE Solidago Solar LLC", "plant producer type": "IPP", "plant name": "ENGIE Solidago Solar Project - Hybrid", "plant state": "DE", "plant id": "65304", "generator id": "BESS", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65304", "date": "2024-05", "mw": 12}, "first_month": "2022-02", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64609", "entity name": "ENGIE Solidago Solar LLC", "plant producer type": "IPP", "plant name": "ENGIE Solidago Solar Project - Hybrid", "plant state": "DE", "plant id": "65304", "generator id": "BESS", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65304", "date": "2024-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "ENGIE Solidago Solar Project - Hybrid", "name_short": "ENGIE Solidago Solar Project", "owner": "ENGIE Solidago Solar LLC", "state": "delaware", "country": "usa", "lat": "38.832789499158764", "long": "-75.52656676197225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.832789499158764+-75.52656676197225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lone Star Solar", "city": "", "id": "683", "external_id": "62235", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "132", "power_mw": "66", "customer": "", "owner": "Lone Star Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "683", "external_id": "62235", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lone Star Solar", "external_id": "62235", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 132, "power_mw": 66, "owner": "Lone Star Solar", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-08", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"50": {"first": {"year": "2023", "month": "12", "entity id": "61752", "entity name": "Lone Star Solar", "plant producer type": "IPP", "plant name": "Lone Star Solar", "plant state": "SC", "plant id": "62235", "generator id": "50", "net summer capacity (mw)": "66", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62235", "date": "2023-12", "mw": 66}, "first_month": "2022-04", "changes": [{"month": "2023-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "61752", "entity name": "Lone Star Solar", "plant producer type": "IPP", "plant name": "Lone Star Solar", "plant state": "SC", "plant id": "62235", "generator id": "50", "net summer capacity (mw)": "66", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62235", "date": "2024-12", "mw": 66}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-08"}, "month_disappeared": ""}}, "mw": 66, "mwh_is_estimate": true, "mwh": 132, "mwh_estimate": 132, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-08", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Lone Star Solar", "name_short": "Lone Star Solar", "owner": "Lone Star Solar", "state": "south carolina", "country": "usa", "lat": "34.78959784072874", "long": "-79.6594265329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.78959784072874+-79.6594265329819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carina", "city": "", "id": "715", "external_id": "65589", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "715", "external_id": "65589", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Carina", "external_id": "65589", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CARNA": {"first": {"year": "2023", "month": "10", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Carina", "plant state": "TX", "plant id": "65589", "generator id": "CARNA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65589", "date": "2023-10", "mw": 150}, "first_month": "2022-05", "changes": [{"month": "2023-03", "li": [{"name": "date", "from": "2023-10", "to": "2024-06", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Carina", "plant state": "TX", "plant id": "65589", "generator id": "CARNA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65589", "date": "2024-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Carina", "name_short": "Carina", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.324054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.324054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Antlia", "city": "", "id": "720", "external_id": "65588", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "720", "external_id": "65588", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Antlia", "external_id": "65588", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ANTLA": {"first": {"year": "2023", "month": "10", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Antlia", "plant state": "TX", "plant id": "65588", "generator id": "ANTLA", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65588", "date": "2023-10", "mw": 70}, "first_month": "2022-05", "changes": [{"month": "2023-03", "li": [{"name": "date", "from": "2023-10", "to": "2024-06", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Antlia", "plant state": "TX", "plant id": "65588", "generator id": "ANTLA", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65588", "date": "2024-12", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Antlia", "name_short": "Antlia", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.23343799999999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.23343799999999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Zeya", "city": "", "id": "791", "external_id": "65880", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "791", "external_id": "65880", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Zeya", "external_id": "65880", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ZEYA": {"first": {"year": "2024", "month": "4", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Zeya", "plant state": "TX", "plant id": "65880", "generator id": "ZEYA", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65880", "date": "2024-04", "mw": 250}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-04", "to": "2024-12", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Zeya", "plant state": "TX", "plant id": "65880", "generator id": "ZEYA", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65880", "date": "2024-12", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Zeya", "name_short": "Zeya", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.39163256713626", "long": "-95.46555141629162", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.39163256713626+-95.46555141629162", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cachi", "city": "", "id": "792", "external_id": "65861", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "792", "external_id": "65861", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cachi", "external_id": "65861", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CACHI": {"first": {"year": "2024", "month": "3", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Cachi", "plant state": "TX", "plant id": "65861", "generator id": "CACHI", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65861", "date": "2024-03", "mw": 200}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-12", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Cachi", "plant state": "TX", "plant id": "65861", "generator id": "CACHI", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65861", "date": "2024-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Cachi", "name_short": "Cachi", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.322390103486484", "long": "-95.45465780673999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.322390103486484+-95.45465780673999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Castor", "city": "", "id": "793", "external_id": "65870", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "793", "external_id": "65870", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Castor", "external_id": "65870", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CASTR": {"first": {"year": "2024", "month": "5", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Castor", "plant state": "TX", "plant id": "65870", "generator id": "CASTR", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65870", "date": "2024-05", "mw": 200}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Castor", "plant state": "TX", "plant id": "65870", "generator id": "CASTR", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65870", "date": "2024-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Castor", "name_short": "Castor", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.255035819383764", "long": "-95.41803317206394", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.255035819383764+-95.41803317206394", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desna", "city": "", "id": "794", "external_id": "65876", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "794", "external_id": "65876", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desna", "external_id": "65876", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DESNA": {"first": {"year": "2024", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Desna", "plant state": "TX", "plant id": "65876", "generator id": "DESNA", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65876", "date": "2024-06", "mw": 200}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Desna", "plant state": "TX", "plant id": "65876", "generator id": "DESNA", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65876", "date": "2024-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Desna", "name_short": "Desna", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.1991708536329", "long": "-95.35625455449248", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.1991708536329+-95.35625455449248", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Avila", "city": "", "id": "796", "external_id": "65860", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "320", "power_mw": "160", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "796", "external_id": "65860", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Avila", "external_id": "65860", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 320, "power_mw": 160, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AVILA": {"first": {"year": "2024", "month": "2", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Avila", "plant state": "TX", "plant id": "65860", "generator id": "AVILA", "net summer capacity (mw)": "160", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65860", "date": "2024-02", "mw": 160}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-12", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Avila", "plant state": "TX", "plant id": "65860", "generator id": "AVILA", "net summer capacity (mw)": "160", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65860", "date": "2024-12", "mw": 160}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 160, "mwh_is_estimate": true, "mwh": 320, "mwh_estimate": 320, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Avila", "name_short": "Avila", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.15732436691591", "long": "-95.17702469775502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.15732436691591+-95.17702469775502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Salt City Solar Project - Hybrid", "city": "", "id": "977", "external_id": "65302", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Salt City Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "977", "external_id": "65302", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Salt City Solar Project - Hybrid", "external_id": "65302", "state": "ohio", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Salt City Solar LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "5", "entity id": "64607", "entity name": "Salt City Solar LLC", "plant producer type": "IPP", "plant name": "Salt City Solar Project - Hybrid", "plant state": "OH", "plant id": "65302", "generator id": "BESS", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65302", "date": "2024-05", "mw": 12}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64607", "entity name": "Salt City Solar LLC", "plant producer type": "IPP", "plant name": "Salt City Solar Project - Hybrid", "plant state": "OH", "plant id": "65302", "generator id": "BESS", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65302", "date": "2024-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Salt City Solar Project - Hybrid", "name_short": "Salt City Solar Project", "owner": "Salt City Solar LLC", "state": "ohio", "country": "usa", "lat": "41.15070000365377", "long": "-80.98233613582602", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.15070000365377+-80.98233613582602", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 3 BESS 2", "city": "", "id": "993", "external_id": "66293", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "993", "external_id": "66293", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 3 BESS 2", "external_id": "66293", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A3BS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 3 BESS 2", "plant state": "TX", "plant id": "66293", "generator id": "A3BS2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66293", "date": "2024-05", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 3 BESS 2", "plant state": "TX", "plant id": "66293", "generator id": "A3BS2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66293", "date": "2024-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Alamo 3 BESS 2", "name_short": "Alamo 3 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.255035819383764", "long": "-95.41803317206394", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.255035819383764+-95.41803317206394", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 4 BESS", "city": "", "id": "994", "external_id": "66294", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "994", "external_id": "66294", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 4 BESS", "external_id": "66294", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A4BS1": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 4 BESS", "plant state": "TX", "plant id": "66294", "generator id": "A4BS1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66294", "date": "2024-05", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 4 BESS", "plant state": "TX", "plant id": "66294", "generator id": "A4BS1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66294", "date": "2024-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Alamo 4 BESS", "name_short": "Alamo 4", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.1991708536329", "long": "-95.35625455449248", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.1991708536329+-95.35625455449248", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 5 BESS 1", "city": "", "id": "995", "external_id": "66295", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "995", "external_id": "66295", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 5 BESS 1", "external_id": "66295", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A5BS1": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 5 BESS 1", "plant state": "TX", "plant id": "66295", "generator id": "A5BS1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66295", "date": "2024-05", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 5 BESS 1", "plant state": "TX", "plant id": "66295", "generator id": "A5BS1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66295", "date": "2024-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Alamo 5 BESS 1", "name_short": "Alamo 5 BESS 1", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.164054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.164054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 5 BESS 2", "city": "", "id": "996", "external_id": "66296", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "996", "external_id": "66296", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 5 BESS 2", "external_id": "66296", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A5BS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 5 BESS 2", "plant state": "TX", "plant id": "66296", "generator id": "A5BS2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66296", "date": "2024-05", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 5 BESS 2", "plant state": "TX", "plant id": "66296", "generator id": "A5BS2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66296", "date": "2024-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Alamo 5 BESS 2", "name_short": "Alamo 5 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.15732436691591", "long": "-95.17702469775502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.15732436691591+-95.17702469775502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Powells Creek Solar - Hybrid", "city": "", "id": "1005", "external_id": "65305", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Powells Creek Farm Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1005", "external_id": "65305", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Powells Creek Solar - Hybrid", "external_id": "65305", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 34, "power_mw": 17, "owner": "Powells Creek Farm Solar, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "5", "entity id": "64610", "entity name": "Powells Creek Farm Solar, LLC", "plant producer type": "IPP", "plant name": "Powells Creek Solar - Hybrid", "plant state": "VA", "plant id": "65305", "generator id": "BESS", "net summer capacity (mw)": "17.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65305", "date": "2024-05", "mw": 17}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64610", "entity name": "Powells Creek Farm Solar, LLC", "plant producer type": "IPP", "plant name": "Powells Creek Solar - Hybrid", "plant state": "VA", "plant id": "65305", "generator id": "BESS", "net summer capacity (mw)": "17.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65305", "date": "2024-12", "mw": 17}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 17, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Powells Creek Solar - Hybrid", "name_short": "Powells Creek Solar", "owner": "Powells Creek Farm Solar, LLC", "state": "virginia", "country": "usa", "lat": "38.270223", "long": "-77.80875", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.270223+-77.80875", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sunnybrook Solar Project - Hybrid", "city": "", "id": "1006", "external_id": "65307", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Sunnybrook Farm Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1006", "external_id": "65307", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sunnybrook Solar Project - Hybrid", "external_id": "65307", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Sunnybrook Farm Solar, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SUNB": {"first": {"year": "2024", "month": "5", "entity id": "64612", "entity name": "Sunnybrook Farm Solar, LLC", "plant producer type": "IPP", "plant name": "Sunnybrook Solar Project - Hybrid", "plant state": "VA", "plant id": "65307", "generator id": "SUNB", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65307", "date": "2024-05", "mw": 12}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64612", "entity name": "Sunnybrook Farm Solar, LLC", "plant producer type": "IPP", "plant name": "Sunnybrook Solar Project - Hybrid", "plant state": "VA", "plant id": "65307", "generator id": "SUNB", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65307", "date": "2024-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Sunnybrook Solar Project - Hybrid", "name_short": "Sunnybrook Solar Project", "owner": "Sunnybrook Farm Solar, LLC", "state": "virginia", "country": "usa", "lat": "38.28576246015096", "long": "-77.8495402432575", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.28576246015096+-77.8495402432575", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hanford BESS", "city": "", "id": "1013", "external_id": "66660", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Hanford BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1013", "external_id": "66660", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lead BESS 1", "external_id": "66660", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 198, "power_mw": 99, "owner": "Hanford BESS LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HAN": {"first": {"year": "2024", "month": "12", "entity id": "65680", "entity name": "Hanford BESS LLC", "plant producer type": "IPP", "plant name": "Hanford BESS", "plant state": "CA", "plant id": "66660", "generator id": "HAN", "net summer capacity (mw)": "99.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66660", "date": "2024-12", "mw": 99}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "plant name", "from": "Hanford BESS", "to": "Lead BESS 1", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "65680", "entity name": "Hanford BESS LLC", "plant producer type": "IPP", "plant name": "Lead BESS 1", "plant state": "CA", "plant id": "66660", "generator id": "HAN", "net summer capacity (mw)": "99.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66660", "date": "2024-12", "mw": 99}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 99, "mwh_is_estimate": true, "mwh": 198, "mwh_estimate": 198, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Lead BESS 1", "name_short": "Lead BESS 1", "owner": "Hanford BESS LLC", "state": "california", "country": "usa", "lat": "41.05310153848376", "long": "-121.35059853169716", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.05310153848376+-121.35059853169716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Henrietta BESS", "city": "", "id": "1014", "external_id": "66661", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Henrietta BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1014", "external_id": "66661", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Electrolyte BESS", "external_id": "66661", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 198, "power_mw": 99, "owner": "Henrietta BESS LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HEN": {"first": {"year": "2024", "month": "12", "entity id": "65681", "entity name": "Henrietta BESS LLC", "plant producer type": "IPP", "plant name": "Henrietta BESS", "plant state": "CA", "plant id": "66661", "generator id": "HEN", "net summer capacity (mw)": "99.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66661", "date": "2024-12", "mw": 99}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "plant name", "from": "Henrietta BESS", "to": "Electrolyte BESS", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "65681", "entity name": "Henrietta BESS LLC", "plant producer type": "IPP", "plant name": "Electrolyte BESS", "plant state": "CA", "plant id": "66661", "generator id": "HEN", "net summer capacity (mw)": "99.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66661", "date": "2024-12", "mw": 99}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 99, "mwh_is_estimate": true, "mwh": 198, "mwh_estimate": 198, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Electrolyte BESS", "name_short": "Electrolyte", "owner": "Henrietta BESS LLC", "state": "california", "country": "usa", "lat": "41.01996289624012", "long": "-121.3334228353925", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01996289624012+-121.3334228353925", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Malaga BESS", "city": "", "id": "1015", "external_id": "66659", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "194", "power_mw": "97", "customer": "", "owner": "Malaga BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1015", "external_id": "66659", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Acid BESS", "external_id": "66659", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 194, "power_mw": 97, "owner": "Malaga BESS LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MAL": {"first": {"year": "2024", "month": "12", "entity id": "65678", "entity name": "Malaga BESS LLC", "plant producer type": "IPP", "plant name": "Malaga BESS", "plant state": "CA", "plant id": "66659", "generator id": "MAL", "net summer capacity (mw)": "97", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66659", "date": "2024-12", "mw": 97}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "plant name", "from": "Malaga BESS", "to": "Acid BESS", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "65678", "entity name": "Malaga BESS LLC", "plant producer type": "IPP", "plant name": "Acid BESS", "plant state": "CA", "plant id": "66659", "generator id": "MAL", "net summer capacity (mw)": "97", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66659", "date": "2024-12", "mw": 97}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 97, "mwh_is_estimate": true, "mwh": 194, "mwh_estimate": 194, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Acid BESS", "name_short": "Acid", "owner": "Malaga BESS LLC", "state": "california", "country": "usa", "lat": "40.992677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.992677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Inland Empire Energy Storage", "city": "", "id": "1016", "external_id": "66726", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1016", "external_id": "66726", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Inland Empire Energy Storage", "external_id": "66726", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Strata Manager, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"IEESS": {"first": {"year": "2024", "month": "6", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Inland Empire Energy Storage", "plant state": "CA", "plant id": "66726", "generator id": "IEESS", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66726", "date": "2024-06", "mw": 70}, "first_month": "2023-07", "changes": [{"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Inland Empire Energy Storage", "plant state": "CA", "plant id": "66726", "generator id": "IEESS", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66726", "date": "2024-12", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Inland Empire Energy Storage", "name_short": "Inland Empire", "owner": "Strata Manager, LLC", "state": "california", "country": "usa", "lat": "40.97811640952314", "long": "-121.253078416855", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.97811640952314+-121.253078416855", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BIA BESS", "city": "", "id": "1019", "external_id": "66662", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "64", "power_mw": "32", "customer": "", "owner": "Hanford BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1019", "external_id": "66662", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lead BESS 2", "external_id": "66662", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 64, "power_mw": 32, "owner": "Hanford BESS LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BIA": {"first": {"year": "2024", "month": "12", "entity id": "65680", "entity name": "Hanford BESS LLC", "plant producer type": "IPP", "plant name": "BIA BESS", "plant state": "CA", "plant id": "66662", "generator id": "BIA", "net summer capacity (mw)": "32", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66662", "date": "2024-12", "mw": 32}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "plant name", "from": "BIA BESS", "to": "Lead BESS 2", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "65680", "entity name": "Hanford BESS LLC", "plant producer type": "IPP", "plant name": "Lead BESS 2", "plant state": "CA", "plant id": "66662", "generator id": "BIA", "net summer capacity (mw)": "32", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66662", "date": "2024-12", "mw": 32}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 32, "mwh_is_estimate": true, "mwh": 64, "mwh_estimate": 64, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Lead BESS 2", "name_short": "Lead BESS 2", "owner": "Hanford BESS LLC", "state": "california", "country": "usa", "lat": "41.05531129522627", "long": "-121.09271867944766", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.05531129522627+-121.09271867944766", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pike County Energy Storage", "city": "", "id": "1045", "external_id": "66881", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Indianapolis Power & Light Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1045", "external_id": "66881", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pike County Energy Storage", "external_id": "66881", "state": "indiana", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Indianapolis Power & Light Co", "status": "construction", "date_first_heard": "2023-09", "start_construction": "2024-05", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT2": {"first": {"year": "2024", "month": "12", "entity id": "9273", "entity name": "Indianapolis Power & Light Co", "plant producer type": "Electric Utility", "plant name": "Pike County Energy Storage", "plant state": "IN", "plant id": "66881", "generator id": "BAT2", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66881", "date": "2024-12", "mw": 200}, "first_month": "2023-09", "changes": [{"month": "2024-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "9273", "entity name": "Indianapolis Power & Light Co", "plant producer type": "Electric Utility", "plant name": "Pike County Energy Storage", "plant state": "IN", "plant id": "66881", "generator id": "BAT2", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66881", "date": "2024-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": "2024-05"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "2024-05", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Pike County Energy Storage", "name_short": "Pike County", "owner": "Indianapolis Power & Light Co", "state": "indiana", "country": "usa", "lat": "41.535135", "long": "-85.332338", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.535135+-85.332338", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scarlet II Hybrid", "city": "", "id": "1177", "external_id": "66951", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "EDPR Scarlet II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1177", "external_id": "66951", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Scarlet II Hybrid", "external_id": "66951", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "EDPR Scarlet II LLC", "status": "planning", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN04": {"first": {"year": "2024", "month": "6", "entity id": "65859", "entity name": "EDPR Scarlet II LLC", "plant producer type": "IPP", "plant name": "Scarlet II Hybrid", "plant state": "CA", "plant id": "66951", "generator id": "GEN04", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66951", "date": "2024-06", "mw": 150}, "first_month": "2023-10", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-06", "to": "2024-10", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-10", "to": "2024-12", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "65859", "entity name": "EDPR Scarlet II LLC", "plant producer type": "IPP", "plant name": "Scarlet II Hybrid", "plant state": "CA", "plant id": "66951", "generator id": "GEN04", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66951", "date": "2024-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Scarlet II Hybrid", "name_short": "Scarlet II", "owner": "EDPR Scarlet II LLC", "state": "california", "country": "usa", "lat": "40.88482600365377", "long": "-121.12724013582601", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.88482600365377+-121.12724013582601", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yuma Solar + Storage", "city": "", "id": "1333", "external_id": "67321", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "134", "power_mw": "67", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1333", "external_id": "67321", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Yuma Solar + Storage", "external_id": "67321", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 134, "power_mw": 67, "owner": "Invenergy Services LLC", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2024", "month": "5", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Yuma Solar + Storage", "plant state": "AZ", "plant id": "67321", "generator id": "BESS1", "net summer capacity (mw)": "67", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67321", "date": "2024-05", "mw": 67}, "first_month": "2024-04", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Yuma Solar + Storage", "plant state": "AZ", "plant id": "67321", "generator id": "BESS1", "net summer capacity (mw)": "67", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67321", "date": "2024-12", "mw": 67}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 67, "mwh_is_estimate": true, "mwh": 134, "mwh_estimate": 134, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Yuma Solar + Storage", "name_short": "Yuma Solar +", "owner": "Invenergy Services LLC", "state": "arizona", "country": "usa", "lat": "36.37649285870876", "long": "-109.95931494178886", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.37649285870876+-109.95931494178886", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mamm Creek", "city": "", "id": "1344", "external_id": "67322", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1344", "external_id": "67322", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mamm Creek", "external_id": "67322", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MCESS": {"first": {"year": "2024", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Mamm Creek", "plant state": "CO", "plant id": "67322", "generator id": "MCESS", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67322", "date": "2024-12", "mw": 10}, "first_month": "2024-04", "changes": [], "current": {"year": "2024", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Mamm Creek", "plant state": "CO", "plant id": "67322", "generator id": "MCESS", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67322", "date": "2024-12", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Mamm Creek", "name_short": "Mamm Creek", "owner": "AES Clean Energy", "state": "colorado", "country": "usa", "lat": "40.79235349473758", "long": "-102.664760144945", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.79235349473758+-102.664760144945", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ville-sur-Haine", "city": "", "id": "1393", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Eneco", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.47647", "long": "4.077998", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1393", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Ville-sur-Haine", "name_short": "Ville-sur-Haine", "owner": "Eneco", "state": "", "country": "belgium", "lat": "50.47647", "long": "4.077998", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.47647+4.077998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hale Kuawehi Solar Hybrid", "city": "", "id": "214", "external_id": "62529", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Hale Kuawehi Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "214", "external_id": "62529", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hale Kuawehi Solar Hybrid", "external_id": "62529", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Hale Kuawehi Solar LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "", "start_estimated": "2024-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HKBA": {"first": {"year": "2022", "month": "12", "entity id": "62008", "entity name": "Hale Kuawehi Solar LLC", "plant producer type": "IPP", "plant name": "Hale Kuawehi Solar Hybrid", "plant state": "HI", "plant id": "62529", "generator id": "HKBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62529", "date": "2022-12", "mw": 30}, "first_month": "2020-09", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-12", "to": "2023-10", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2023-10", "to": "2024-11", "extra": "delayed by 13 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "11", "entity id": "62008", "entity name": "Hale Kuawehi Solar LLC", "plant producer type": "IPP", "plant name": "Hale Kuawehi Solar Hybrid", "plant state": "HI", "plant id": "62529", "generator id": "HKBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62529", "date": "2024-11", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-02"}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "", "start_estimated": "2024-11", "month_disappeared": "", "go_live": "0 ~ 2024-11", "go_live_year_int": 2024, "name": "Hale Kuawehi Solar Hybrid", "name_short": "Hale Kuawehi Solar", "owner": "Hale Kuawehi Solar LLC", "state": "hawaii", "country": "usa", "lat": "19.509130896240123", "long": "-155.5469088353925", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.509130896240123+-155.5469088353925", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ho'Ohana Solar 1", "city": "", "id": "212", "external_id": "63723", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "104", "power_mw": "52", "customer": "", "owner": "Ho'Ohana Solar 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "212", "external_id": "63723", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ho'Ohana Solar 1", "external_id": "63723", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 104, "power_mw": 52, "owner": "Ho'Ohana Solar 1 LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HESS1": {"first": {"year": "2022", "month": "9", "entity id": "63416", "entity name": "Ho'Ohana Solar 1 LLC", "plant producer type": "IPP", "plant name": "Ho'Ohana Solar 1", "plant state": "HI", "plant id": "63723", "generator id": "HESS1", "net summer capacity (mw)": "52", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63723", "date": "2022-09", "mw": 52}, "first_month": "2020-09", "changes": [{"month": "2021-11", "li": [{"name": "date", "from": "2022-09", "to": "2023-08", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2024-10", "extra": "delayed by 14 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "10", "entity id": "63416", "entity name": "Ho'Ohana Solar 1 LLC", "plant producer type": "IPP", "plant name": "Ho'Ohana Solar 1", "plant state": "HI", "plant id": "63723", "generator id": "HESS1", "net summer capacity (mw)": "52", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63723", "date": "2024-10", "mw": 52}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 52, "mwh_is_estimate": true, "mwh": 104, "mwh_estimate": 104, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "go_live": "0 ~ 2024-10", "go_live_year_int": 2024, "name": "Ho'Ohana Solar 1", "name_short": "Ho'Ohana Solar 1", "owner": "Ho'Ohana Solar 1 LLC", "state": "hawaii", "country": "usa", "lat": "19.57422674385328", "long": "-155.56531208764", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.57422674385328+-155.56531208764", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bright Arrow Solar, LLC", "city": "", "id": "1030", "external_id": "66688", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "206", "power_mw": "103", "customer": "", "owner": "Bright Arrow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1030", "external_id": "66688", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bright Arrow Solar, LLC", "external_id": "66688", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 206, "power_mw": 103, "owner": "Bright Arrow Solar, LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BASS1": {"first": {"year": "2024", "month": "5", "entity id": "65694", "entity name": "Bright Arrow Solar, LLC", "plant producer type": "IPP", "plant name": "Bright Arrow Solar, LLC", "plant state": "TX", "plant id": "66688", "generator id": "BASS1", "net summer capacity (mw)": "103.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66688", "date": "2024-05", "mw": 103}, "first_month": "2023-07", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-05", "to": "2024-10", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "10", "entity id": "65694", "entity name": "Bright Arrow Solar, LLC", "plant producer type": "IPP", "plant name": "Bright Arrow Solar, LLC", "plant state": "TX", "plant id": "66688", "generator id": "BASS1", "net summer capacity (mw)": "103.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66688", "date": "2024-10", "mw": 103}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 103, "mwh_is_estimate": true, "mwh": 206, "mwh_estimate": 206, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "go_live": "0 ~ 2024-10", "go_live_year_int": 2024, "name": "Bright Arrow Solar, LLC", "name_short": "Bright Arrow Solar", "owner": "Bright Arrow Solar, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.333438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.333438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GulfStar Power, LLC", "city": "", "id": "1053", "external_id": "66871", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "GulfStar Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1053", "external_id": "66871", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "GulfStar Power, LLC", "external_id": "66871", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "GulfStar Power, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "6", "entity id": "65805", "entity name": "GulfStar Power, LLC", "plant producer type": "IPP", "plant name": "GulfStar Power, LLC", "plant state": "TX", "plant id": "66871", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66871", "date": "2024-06", "mw": 300}, "first_month": "2023-09", "changes": [{"month": "2024-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-06", "to": "2024-10", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "10", "entity id": "65805", "entity name": "GulfStar Power, LLC", "plant producer type": "IPP", "plant name": "GulfStar Power, LLC", "plant state": "TX", "plant id": "66871", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66871", "date": "2024-10", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "go_live": "0 ~ 2024-10", "go_live_year_int": 2024, "name": "GulfStar Power, LLC", "name_short": "GulfStar Power", "owner": "GulfStar Power, LLC", "state": "texas", "country": "usa", "lat": "33.319757178933756", "long": "-95.37101035188054", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.319757178933756+-95.37101035188054", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ables Springs Solar & Storage", "city": "", "id": "1059", "external_id": "66905", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Ables Springs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1059", "external_id": "66905", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ables Springs Solar & Storage", "external_id": "66905", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Ables Springs Solar, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "10", "entity id": "65819", "entity name": "Ables Springs Solar, LLC", "plant producer type": "IPP", "plant name": "Ables Springs Solar & Storage", "plant state": "TX", "plant id": "66905", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66905", "date": "2024-10", "mw": 100}, "first_month": "2023-09", "changes": [{"month": "2024-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "10", "entity id": "65819", "entity name": "Ables Springs Solar, LLC", "plant producer type": "IPP", "plant name": "Ables Springs Solar & Storage", "plant state": "TX", "plant id": "66905", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66905", "date": "2024-10", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "go_live": "0 ~ 2024-10", "go_live_year_int": 2024, "name": "Ables Springs Solar & Storage", "name_short": "Ables Springs Solar &", "owner": "Ables Springs Solar, LLC", "state": "texas", "country": "usa", "lat": "33.361966935676264", "long": "-94.99002315814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.361966935676264+-94.99002315814404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eland Solar", "city": "Kern County", "id": "62", "external_id": "61168", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "8minute / Capital Dynamics / LADWP", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-22", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.198008", "long": "-117.991201", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "location from planning doc ** partially online in 2022, fully in 2023", "project_website": "", "link1": "https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "link2": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link3": "", "link4": ""}, "internal_id": "62", "external_id": "61168", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eland Solar & Storage Center, Phase 1 Hybrid", "external_id": "61168", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "68SF 8me LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-01", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61168": {"first": {"year": "2022", "month": "11", "entity id": "60797", "entity name": "68SF 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 1 Hybrid", "plant state": "CA", "plant id": "61168", "generator id": "61168", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61168", "date": "2022-11", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-11", "to": "2023-07", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-03", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-11", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-11", "to": "2024-09", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "60797", "entity name": "68SF 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 1 Hybrid", "plant state": "CA", "plant id": "61168", "generator id": "61168", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "61168", "date": "2024-09", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-01", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Eland Solar & Storage Center, Phase 1 Hybrid", "name_short": "Eland Solar & Storage Center, Phase...", "owner": "68SF 8me LLC", "state": "california", "country": "usa", "lat": "35.198008", "long": "-117.991201", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.198008+-117.991201", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from planning doc ", " partially online in 2022, fully in 2023"], "links": ["https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "https://x.com/Tesla_Megapack/status/1794120454883659833"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Noosa Energy Storage LLC", "city": "", "id": "173", "external_id": "64531", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Noosa Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "173", "external_id": "64531", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Noosa Energy Storage LLC", "external_id": "64531", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 198, "power_mw": 99, "owner": "Engie North America", "status": "construction", "date_first_heard": "2021-04", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KOV4A": {"first": {"year": "2023", "month": "10", "entity id": "64164", "entity name": "Noosa Energy Storage LLC", "plant producer type": "IPP", "plant name": "Noosa Energy Storage LLC", "plant state": "CA", "plant id": "64531", "generator id": "KOV4A", "net summer capacity (mw)": "99", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64531", "date": "2023-10", "mw": 99}, "first_month": "2021-04", "changes": [{"month": "2023-06", "li": [{"name": "entity id", "from": "64164", "to": "63883", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Noosa Energy Storage LLC", "to": "Broad Reach Power", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-10", "to": "2024-09", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "9", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Noosa Energy Storage LLC", "plant state": "CA", "plant id": "64531", "generator id": "KOV4A", "net summer capacity (mw)": "99", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64531", "date": "2024-09", "mw": 99}, "current_month": "2024-06", "dates": {"first_heard": "2021-04", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 99, "mwh_is_estimate": true, "mwh": 198, "mwh_estimate": 198, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-04", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Noosa Energy Storage LLC", "name_short": "Noosa Energy Storage", "owner": "Engie North America", "state": "california", "country": "usa", "lat": "40.956019499158764", "long": "-121.42113276197225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.956019499158764+-121.42113276197225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Painter Energy Storage", "city": "", "id": "182", "external_id": "62729", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Painter Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "182", "external_id": "62729", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Painter Energy Storage", "external_id": "62729", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Painter Energy Storage, LLC", "status": "construction", "date_first_heard": "2021-03", "start_construction": "2022-06", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PAIN1": {"first": {"year": "2021", "month": "12", "entity id": "62646", "entity name": "Painter Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Painter Energy Storage", "plant state": "CA", "plant id": "62729", "generator id": "PAIN1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62729", "date": "2021-12", "mw": 40}, "first_month": "2021-03", "changes": [{"month": "2021-08", "li": [{"name": "date", "from": "2021-12", "to": "2022-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-09", "to": "2022-07", "extra": "accelerated by 2 months", "change_type": "timing"}, {"name": "mw", "from": 40, "to": 10, "extra": "", "change_type": "misc"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-08", "to": "2023-03", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-08", "to": "2023-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-07", "to": "2024-09", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "62646", "entity name": "Painter Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Painter Energy Storage", "plant state": "CA", "plant id": "62729", "generator id": "PAIN1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62729", "date": "2024-09", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2021-03", "start_construction": "2022-06"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-03", "start_construction": "2022-06", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Painter Energy Storage", "name_short": "Painter", "owner": "Painter Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.24258519146767", "long": "-121.13500953314751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.24258519146767+-121.13500953314751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AVEP BESS", "city": "", "id": "700", "external_id": "65591", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "252", "power_mw": "126", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "700", "external_id": "65591", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AVEP BESS", "external_id": "65591", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 252, "power_mw": 126, "owner": "Leeward Asset Management, LLC", "status": "construction", "date_first_heard": "2022-05", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AVEPB": {"first": {"year": "2023", "month": "5", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "AVEP BESS", "plant state": "CA", "plant id": "65591", "generator id": "AVEPB", "net summer capacity (mw)": "126", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65591", "date": "2023-05", "mw": 126}, "first_month": "2022-05", "changes": [{"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2024-06", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-06", "to": "2024-09", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "AVEP BESS", "plant state": "CA", "plant id": "65591", "generator id": "AVEPB", "net summer capacity (mw)": "126", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65591", "date": "2024-09", "mw": 126}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 126, "mwh_is_estimate": true, "mwh": 252, "mwh_estimate": 252, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "AVEP BESS", "name_short": "AVEP", "owner": "Leeward Asset Management, LLC", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Placerita ESS", "city": "", "id": "956", "external_id": "66462", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "956", "external_id": "66462", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Placerita ESS", "external_id": "66462", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "Terra-Gen Operating Co-BESS 2", "status": "construction", "date_first_heard": "2023-04", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN1": {"first": {"year": "2024", "month": "2", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Placerita ESS", "plant state": "CA", "plant id": "66462", "generator id": "GEN1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66462", "date": "2024-02", "mw": 80}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity id", "from": "64287", "to": "65552", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Terra-Gen Operating Co-BESS", "to": "Terra-Gen Operating Co-BESS 2", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-09", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Placerita ESS", "plant state": "CA", "plant id": "66462", "generator id": "GEN1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66462", "date": "2024-09", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-04", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Placerita ESS", "name_short": "Placerita ESS", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "40.902031888219526", "long": "-121.22835705730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.902031888219526+-121.22835705730502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sagebrush Solar 2 ESS 59", "city": "", "id": "1180", "external_id": "66950", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "118", "power_mw": "59", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1180", "external_id": "66950", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sagebrush Solar 2 ESS 59", "external_id": "66950", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 118, "power_mw": 59, "owner": "Terra-Gen Operating Co-BESS 2", "status": "construction", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush Solar 2 ESS 59", "plant state": "CA", "plant id": "66950", "generator id": "1", "net summer capacity (mw)": "59", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66950", "date": "2024-09", "mw": 59}, "first_month": "2023-10", "changes": [], "current": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush Solar 2 ESS 59", "plant state": "CA", "plant id": "66950", "generator id": "1", "net summer capacity (mw)": "59", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66950", "date": "2024-09", "mw": 59}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 59, "mwh_is_estimate": true, "mwh": 118, "mwh_estimate": 118, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Sagebrush Solar 2 ESS 59", "name_short": "Sagebrush Solar 2 ESS 59", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.140049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.140049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sagebrush Solar 2 ESS 40", "city": "", "id": "1182", "external_id": "66949", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1182", "external_id": "66949", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sagebrush Solar 2 ESS 40", "external_id": "66949", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Terra-Gen Operating Co-BESS 2", "status": "construction", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush Solar 2 ESS 40", "plant state": "CA", "plant id": "66949", "generator id": "1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66949", "date": "2024-09", "mw": 40}, "first_month": "2023-10", "changes": [], "current": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush Solar 2 ESS 40", "plant state": "CA", "plant id": "66949", "generator id": "1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66949", "date": "2024-09", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Sagebrush Solar 2 ESS 40", "name_short": "Sagebrush Solar 2 ESS 40", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "41.24258519146767", "long": "-121.13500953314751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.24258519146767+-121.13500953314751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dover Energy Storage", "city": "", "id": "1311", "external_id": "67120", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1311", "external_id": "67120", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dover Energy Storage", "external_id": "67120", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Tampa Electric Co", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2024", "month": "9", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Dover Energy Storage", "plant state": "FL", "plant id": "67120", "generator id": "BESS1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67120", "date": "2024-09", "mw": 15}, "first_month": "2024-02", "changes": [{"month": "2024-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "9", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Dover Energy Storage", "plant state": "FL", "plant id": "67120", "generator id": "BESS1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67120", "date": "2024-09", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Dover Energy Storage", "name_short": "Dover", "owner": "Tampa Electric Co", "state": "florida", "country": "usa", "lat": "30.119005286236252", "long": "-82.18746637368439", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.119005286236252+-82.18746637368439", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pome BESS", "city": "", "id": "1336", "external_id": "67299", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "IOWN Renewable", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1336", "external_id": "67299", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pome BESS", "external_id": "67299", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "IOWN Renewable", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"10101": {"first": {"year": "2024", "month": "11", "entity id": "66165", "entity name": "IOWN Renewable", "plant producer type": "IPP", "plant name": "Pome BESS", "plant state": "CA", "plant id": "67299", "generator id": "10101", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67299", "date": "2024-11", "mw": 100}, "first_month": "2024-04", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-11", "to": "2024-09", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "66165", "entity name": "IOWN Renewable", "plant producer type": "IPP", "plant name": "Pome BESS", "plant state": "CA", "plant id": "67299", "generator id": "10101", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67299", "date": "2024-09", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Pome BESS", "name_short": "Pome", "owner": "IOWN Renewable", "state": "california", "country": "usa", "lat": "40.94007414887133", "long": "-121.24071773708002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94007414887133+-121.24071773708002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES ES Alamitos 2 LLC", "city": "", "id": "1337", "external_id": "67579", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "164", "power_mw": "82", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1337", "external_id": "67579", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES ES Alamitos 2 LLC", "external_id": "67579", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 164, "power_mw": 82, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ALMT2": {"first": {"year": "2024", "month": "9", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "AES ES Alamitos 2 LLC", "plant state": "CA", "plant id": "67579", "generator id": "ALMT2", "net summer capacity (mw)": "82", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67579", "date": "2024-09", "mw": 82}, "first_month": "2024-06", "changes": [], "current": {"year": "2024", "month": "9", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "AES ES Alamitos 2 LLC", "plant state": "CA", "plant id": "67579", "generator id": "ALMT2", "net summer capacity (mw)": "82", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67579", "date": "2024-09", "mw": 82}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 82, "mwh_is_estimate": true, "mwh": 164, "mwh_estimate": 164, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "AES ES Alamitos 2 LLC", "name_short": "AES ES Alamitos 2", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "40.94954736320376", "long": "-121.17426295600941", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94954736320376+-121.17426295600941", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Quartzite", "city": "", "id": "696", "external_id": "59871", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Desert Quartzite LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "696", "external_id": "59871", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Quartzite", "external_id": "59871", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Desert Quartzite LLC", "status": "construction", "date_first_heard": "2022-05", "start_construction": "2023-04", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2023", "month": "8", "entity id": "59656", "entity name": "Desert Quartzite LLC", "plant producer type": "IPP", "plant name": "Desert Quartzite", "plant state": "CA", "plant id": "59871", "generator id": "GEN02", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "59871", "date": "2023-08", "mw": 150}, "first_month": "2022-05", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-08", "to": "2024-08", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "59656", "entity name": "Desert Quartzite LLC", "plant producer type": "IPP", "plant name": "Desert Quartzite", "plant state": "CA", "plant id": "59871", "generator id": "GEN02", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "59871", "date": "2024-08", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "2023-04", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Desert Quartzite", "name_short": "Desert Quartzite", "owner": "Desert Quartzite LLC", "state": "california", "country": "usa", "lat": "40.82594736691591", "long": "-121.20363569775502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.82594736691591+-121.20363569775502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX10 Hummingbird Storage", "city": "", "id": "718", "external_id": "65693", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "718", "external_id": "65693", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX10 Hummingbird Storage", "external_id": "65693", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Key Capture Energy", "status": "construction", "date_first_heard": "2022-07", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX10": {"first": {"year": "2023", "month": "8", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX10 Hummingbird Storage", "plant state": "TX", "plant id": "65693", "generator id": "TX10", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65693", "date": "2023-08", "mw": 100}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-08", "to": "2024-01", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2024-04", "to": "2024-07", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-07", "to": "2024-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-07", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-07", "to": "2024-08", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX10 Hummingbird Storage", "plant state": "TX", "plant id": "65693", "generator id": "TX10", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "65693", "date": "2024-08", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "TX10 Hummingbird Storage", "name_short": "TX10 Hummingbird", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.33884809055068", "long": "-95.11487066910252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.33884809055068+-95.11487066910252", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX15 Limousin Oak Storage", "city": "", "id": "719", "external_id": "65698", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "719", "external_id": "65698", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX15 Limousin Oak Storage", "external_id": "65698", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Key Capture Energy", "status": "construction", "date_first_heard": "2022-07", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX15": {"first": {"year": "2023", "month": "10", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX15 Limousin Oak Storage", "plant state": "TX", "plant id": "65698", "generator id": "TX15", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65698", "date": "2023-10", "mw": 100}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-10", "to": "2024-01", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "8", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX15 Limousin Oak Storage", "plant state": "TX", "plant id": "65698", "generator id": "TX15", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "65698", "date": "2024-08", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "TX15 Limousin Oak Storage", "name_short": "TX15 Limousin Oak", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.386688295226264", "long": "-95.06610767944765", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.386688295226264+-95.06610767944765", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaumont BESS", "city": "", "id": "955", "external_id": "66461", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "955", "external_id": "66461", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaumont BESS", "external_id": "66461", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Terra-Gen Operating Co-BESS 2", "status": "construction", "date_first_heard": "2023-04", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN1": {"first": {"year": "2024", "month": "3", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Beaumont BESS", "plant state": "CA", "plant id": "66461", "generator id": "GEN1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66461", "date": "2024-03", "mw": 100}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity id", "from": "64287", "to": "65552", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Terra-Gen Operating Co-BESS", "to": "Terra-Gen Operating Co-BESS 2", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2024-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-06", "to": "2024-08", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Beaumont BESS", "plant state": "CA", "plant id": "66461", "generator id": "GEN1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66461", "date": "2024-08", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-04", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Beaumont BESS", "name_short": "Beaumont", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "40.912677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.912677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hemmingway BESS", "city": "", "id": "968", "external_id": "66325", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "968", "external_id": "66325", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hemmingway BESS", "external_id": "66325", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 232, "power_mw": 116, "owner": "Idaho Power Co", "status": "construction", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Hemmingway BESS", "plant state": "ID", "plant id": "66325", "generator id": "1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66325", "date": "2023-06", "mw": 80}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-08", "to": "2023-07", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Hemmingway BESS", "plant state": "ID", "plant id": "66325", "generator id": "1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66325", "date": "2024-06", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}, "HGWP2": {"first": {"year": "2024", "month": "7", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Hemmingway BESS", "plant state": "ID", "plant id": "66325", "generator id": "HGWP2", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66325", "date": "2024-07", "mw": 36}, "first_month": "2024-02", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-07", "to": "2024-08", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Hemmingway BESS", "plant state": "ID", "plant id": "66325", "generator id": "HGWP2", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66325", "date": "2024-08", "mw": 36}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 116, "mwh_is_estimate": true, "mwh": 232, "mwh_estimate": 232, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Hemmingway BESS", "name_short": "Hemmingway", "owner": "Idaho Power Co", "state": "idaho", "country": "usa", "lat": "44.43731843467857", "long": "-112.913255030335", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.43731843467857+-112.913255030335", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grizzly Ridge Solar", "city": "", "id": "1004", "external_id": "66410", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Grizzly Ridge Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1004", "external_id": "66410", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Grizzly Ridge Solar", "external_id": "66410", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Grizzly Ridge Solar LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"596": {"first": {"year": "2023", "month": "4", "entity id": "65451", "entity name": "Grizzly Ridge Solar LLC", "plant producer type": "Commercial", "plant name": "Grizzly Ridge Solar", "plant state": "TX", "plant id": "66410", "generator id": "596", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66410", "date": "2023-04", "mw": 10}, "first_month": "2023-04", "changes": [{"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2024-02", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-04", "to": "2024-08", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "65451", "entity name": "Grizzly Ridge Solar LLC", "plant producer type": "Commercial", "plant name": "Grizzly Ridge Solar", "plant state": "TX", "plant id": "66410", "generator id": "596", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66410", "date": "2024-08", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Grizzly Ridge Solar", "name_short": "Grizzly Ridge Solar", "owner": "Grizzly Ridge Solar LLC", "state": "texas", "country": "usa", "lat": "33.537746973433975", "long": "-95.24624450449501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.537746973433975+-95.24624450449501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McFarland B Solar and Storage", "city": "", "id": "1008", "external_id": "66637", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1008", "external_id": "66637", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McFarland B Solar and Storage", "external_id": "66637", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2023-06", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland B Solar and Storage", "plant state": "AZ", "plant id": "66637", "generator id": "BESS", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66637", "date": "2023-12", "mw": 150}, "first_month": "2023-06", "changes": [{"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2024-05", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-05", "to": "2024-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-07", "to": "2024-08", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland B Solar and Storage", "plant state": "AZ", "plant id": "66637", "generator id": "BESS", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66637", "date": "2024-08", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "McFarland B Solar and Storage", "name_short": "McFarland B Solar", "owner": "AES Clean Energy", "state": "arizona", "country": "usa", "lat": "36.58187920440347", "long": "-110.02764099100999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.58187920440347+-110.02764099100999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Estonian Solar Project, LLC", "city": "", "id": "1058", "external_id": "66872", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Enel Green Power Estonian Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1058", "external_id": "66872", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Estonian Solar Project, LLC", "external_id": "66872", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Enel Green Power Estonian Solar Project, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "4", "entity id": "65799", "entity name": "Enel Green Power Estonian Solar Project, LLC", "plant producer type": "IPP", "plant name": "Estonian Solar Project, LLC", "plant state": "TX", "plant id": "66872", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66872", "date": "2024-04", "mw": 100}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2024-04", "to": "2024-10", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-10", "to": "2024-03", "extra": "accelerated by 7 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-08", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "65799", "entity name": "Enel Green Power Estonian Solar Project, LLC", "plant producer type": "IPP", "plant name": "Estonian Solar Project, LLC", "plant state": "TX", "plant id": "66872", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66872", "date": "2024-08", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Estonian Solar Project, LLC", "name_short": "Estonian Solar Project", "owner": "Enel Green Power Estonian Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.291825270367276", "long": "-95.05014930955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.291825270367276+-95.05014930955251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Archie Horne", "city": "", "id": "1184", "external_id": "67040", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1184", "external_id": "67040", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Archie Horne", "external_id": "67040", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "North Carolina El Member Corp", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT1": {"first": {"year": "2024", "month": "8", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "Archie Horne", "plant state": "NC", "plant id": "67040", "generator id": "BAT1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67040", "date": "2024-08", "mw": 10}, "first_month": "2023-12", "changes": [], "current": {"year": "2024", "month": "8", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "Archie Horne", "plant state": "NC", "plant id": "67040", "generator id": "BAT1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67040", "date": "2024-08", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Archie Horne", "name_short": "Archie Horne", "owner": "North Carolina El Member Corp", "state": "north carolina", "country": "usa", "lat": "36.5619040160412", "long": "-76.800194785395", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.5619040160412+-76.800194785395", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cathode (Hinson) BESS", "city": "", "id": "681", "external_id": "65457", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "681", "external_id": "65457", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cathode (Hinson) BESS", "external_id": "65457", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Southern California Edison Co", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2022-08", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"CATH1": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Cathode (Hinson) BESS", "plant state": "CA", "plant id": "65457", "generator id": "CATH1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65457", "date": "2022-08", "mw": 100}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-04", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-07", "to": "2023-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Cathode (Hinson) BESS", "plant state": "CA", "plant id": "65457", "generator id": "CATH1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65457", "date": "2024-07", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-08"}, "month_disappeared": ""}, "CATH2": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Cathode (Hinson) BESS", "plant state": "CA", "plant id": "65457", "generator id": "CATH2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65457", "date": "2022-08", "mw": 100}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-04", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-07", "to": "2023-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Cathode (Hinson) BESS", "plant state": "CA", "plant id": "65457", "generator id": "CATH2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65457", "date": "2024-07", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-08"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2022-08", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Cathode (Hinson) BESS", "name_short": "Cathode (Hinson)", "owner": "Southern California Edison Co", "state": "california", "country": "usa", "lat": "41.17891809297625", "long": "-121.12695671403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17891809297625+-121.12695671403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tumbleweed Energy Storage", "city": "", "id": "1017", "external_id": "66666", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Tumbleweed Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1017", "external_id": "66666", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Tumbleweed Energy Storage", "external_id": "66666", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "Tumbleweed Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"TWES1": {"first": {"year": "2024", "month": "6", "entity id": "65685", "entity name": "Tumbleweed Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Tumbleweed Energy Storage", "plant state": "CA", "plant id": "66666", "generator id": "TWES1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66666", "date": "2024-06", "mw": 50}, "first_month": "2023-07", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-07", "to": "2024-06", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "65685", "entity name": "Tumbleweed Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Tumbleweed Energy Storage", "plant state": "CA", "plant id": "66666", "generator id": "TWES1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66666", "date": "2024-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-11"}, "month_disappeared": ""}, "TWES2": {"first": {"year": "2024", "month": "7", "entity id": "65685", "entity name": "Tumbleweed Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Tumbleweed Energy Storage", "plant state": "CA", "plant id": "66666", "generator id": "TWES2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66666", "date": "2024-07", "mw": 75}, "first_month": "2023-07", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "7", "entity id": "65685", "entity name": "Tumbleweed Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Tumbleweed Energy Storage", "plant state": "CA", "plant id": "66666", "generator id": "TWES2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66666", "date": "2024-07", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Tumbleweed Energy Storage", "name_short": "Tumbleweed", "owner": "Tumbleweed Energy Storage, LLC", "state": "california", "country": "usa", "lat": "40.98190804297876", "long": "-121.19777436610111", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98190804297876+-121.19777436610111", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bottleneck Energy Storage", "city": "", "id": "1037", "external_id": "66757", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "VESI 12 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1037", "external_id": "66757", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bottleneck Energy Storage", "external_id": "66757", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "VESI 12 LLC", "status": "construction", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BN1": {"first": {"year": "2024", "month": "4", "entity id": "65754", "entity name": "VESI 12 LLC", "plant producer type": "IPP", "plant name": "Bottleneck Energy Storage", "plant state": "CA", "plant id": "66757", "generator id": "BN1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66757", "date": "2024-04", "mw": 80}, "first_month": "2023-08", "changes": [{"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-04", "to": "2024-07", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "65754", "entity name": "VESI 12 LLC", "plant producer type": "IPP", "plant name": "Bottleneck Energy Storage", "plant state": "CA", "plant id": "66757", "generator id": "BN1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66757", "date": "2024-07", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Bottleneck Energy Storage", "name_short": "Bottleneck", "owner": "VESI 12 LLC", "state": "california", "country": "usa", "lat": "40.94954736320376", "long": "-121.17426295600941", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94954736320376+-121.17426295600941", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Myrtle Storage", "city": "", "id": "1055", "external_id": "66913", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Myrtle Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1055", "external_id": "66913", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Myrtle Storage", "external_id": "66913", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Myrtle Storage, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MYRST": {"first": {"year": "2023", "month": "12", "entity id": "65830", "entity name": "Myrtle Storage, LLC", "plant producer type": "IPP", "plant name": "Myrtle Storage", "plant state": "TX", "plant id": "66913", "generator id": "MYRST", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66913", "date": "2023-12", "mw": 150}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-07", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "65830", "entity name": "Myrtle Storage, LLC", "plant producer type": "IPP", "plant name": "Myrtle Storage", "plant state": "TX", "plant id": "66913", "generator id": "MYRST", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66913", "date": "2024-07", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Myrtle Storage", "name_short": "Myrtle", "owner": "Myrtle Storage, LLC", "state": "texas", "country": "usa", "lat": "33.244054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.244054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Danish Fields Storage", "city": "", "id": "1056", "external_id": "66916", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Danish Fields Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1056", "external_id": "66916", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Danish Fields Storage", "external_id": "66916", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Danish Fields Storage, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DANST": {"first": {"year": "2024", "month": "2", "entity id": "65833", "entity name": "Danish Fields Storage, LLC", "plant producer type": "IPP", "plant name": "Danish Fields Storage", "plant state": "TX", "plant id": "66916", "generator id": "DANST", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66916", "date": "2024-02", "mw": 150}, "first_month": "2023-09", "changes": [{"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-07", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "65833", "entity name": "Danish Fields Storage, LLC", "plant producer type": "IPP", "plant name": "Danish Fields Storage", "plant state": "TX", "plant id": "66916", "generator id": "DANST", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66916", "date": "2024-07", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Danish Fields Storage", "name_short": "Danish Fields", "owner": "Danish Fields Storage, LLC", "state": "texas", "country": "usa", "lat": "33.23340888821952", "long": "-95.20174605730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.23340888821952+-95.20174605730502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Longbow BESS, LLC", "city": "", "id": "1188", "external_id": "67083", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "348", "power_mw": "174", "customer": "", "owner": "Longbow BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1188", "external_id": "67083", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Longbow BESS, LLC", "external_id": "67083", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 348, "power_mw": 174, "owner": "Longbow BESS, LLC", "status": "construction", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LBBES": {"first": {"year": "2024", "month": "7", "entity id": "65984", "entity name": "Longbow BESS, LLC", "plant producer type": "IPP", "plant name": "Longbow BESS, LLC", "plant state": "TX", "plant id": "67083", "generator id": "LBBES", "net summer capacity (mw)": "174", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67083", "date": "2024-07", "mw": 174}, "first_month": "2024-01", "changes": [], "current": {"year": "2024", "month": "7", "entity id": "65984", "entity name": "Longbow BESS, LLC", "plant producer type": "IPP", "plant name": "Longbow BESS, LLC", "plant state": "TX", "plant id": "67083", "generator id": "LBBES", "net summer capacity (mw)": "174", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67083", "date": "2024-07", "mw": 174}, "current_month": "2024-06", "dates": {"first_heard": "2024-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 174, "mwh_is_estimate": true, "mwh": 348, "mwh_estimate": 348, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Longbow BESS, LLC", "name_short": "Longbow BESS", "owner": "Longbow BESS, LLC", "state": "texas", "country": "usa", "lat": "33.65154984477027", "long": "-95.54526771010998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65154984477027+-95.54526771010998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Santee BESS", "city": "", "id": "1310", "external_id": "67118", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1310", "external_id": "67118", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Santee BESS", "external_id": "67118", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Santee BESS", "plant state": "CA", "plant id": "67118", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67118", "date": "2024-07", "mw": 10}, "first_month": "2024-02", "changes": [], "current": {"year": "2024", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Santee BESS", "plant state": "CA", "plant id": "67118", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67118", "date": "2024-07", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Santee BESS", "name_short": "Santee", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.320049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.320049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Franklin Battery Storage", "city": "", "id": "1315", "external_id": "67183", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1315", "external_id": "67183", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Franklin Battery Storage", "external_id": "67183", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Idaho Power Co", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FRBS": {"first": {"year": "2024", "month": "7", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Franklin Battery Storage", "plant state": "ID", "plant id": "67183", "generator id": "FRBS", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67183", "date": "2024-07", "mw": 60}, "first_month": "2024-02", "changes": [], "current": {"year": "2024", "month": "7", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Franklin Battery Storage", "plant state": "ID", "plant id": "67183", "generator id": "FRBS", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67183", "date": "2024-07", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Franklin Battery Storage", "name_short": "Franklin", "owner": "Idaho Power Co", "state": "idaho", "country": "usa", "lat": "44.133334", "long": "-112.673786", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.133334+-112.673786", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Davis Battery Storage", "city": "", "id": "1340", "external_id": "67304", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1340", "external_id": "67304", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Davis Battery Storage", "external_id": "67304", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "United Power, Inc", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DAVBA": {"first": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Davis Battery Storage", "plant state": "CO", "plant id": "67304", "generator id": "DAVBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67304", "date": "2024-05", "mw": 11}, "first_month": "2024-04", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-07", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Davis Battery Storage", "plant state": "CO", "plant id": "67304", "generator id": "DAVBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67304", "date": "2024-07", "mw": 11}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Davis Battery Storage", "name_short": "Davis", "owner": "United Power, Inc", "state": "colorado", "country": "usa", "lat": "40.632576", "long": "-102.636675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.632576+-102.636675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "High Mesa CO", "city": "", "id": "1343", "external_id": "67323", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1343", "external_id": "67323", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "High Mesa CO", "external_id": "67323", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HMESS": {"first": {"year": "2024", "month": "4", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "High Mesa CO", "plant state": "CO", "plant id": "67323", "generator id": "HMESS", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67323", "date": "2024-04", "mw": 10}, "first_month": "2024-04", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-07", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "High Mesa CO", "plant state": "CO", "plant id": "67323", "generator id": "HMESS", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67323", "date": "2024-07", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "High Mesa CO", "name_short": "High Mesa CO", "owner": "AES Clean Energy", "state": "colorado", "country": "usa", "lat": "40.750692481178746", "long": "-102.6308583531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.750692481178746+-102.6308583531653", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "San Juan 1", "city": "", "id": "103", "external_id": "66574", "state": "new mexico", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "430", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.804042", "long": "-108.445356", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, "internal_id": "103", "external_id": "66574", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "San Juan Solar I", "external_id": "66574", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "San Juan Solar I, LLC", "status": "construction", "date_first_heard": "2023-05", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SJSS": {"first": {"year": "2024", "month": "8", "entity id": "65626", "entity name": "San Juan Solar I, LLC", "plant producer type": "IPP", "plant name": "San Juan Solar I", "plant state": "NM", "plant id": "66574", "generator id": "SJSS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66574", "date": "2024-08", "mw": 100}, "first_month": "2023-05", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2024-08", "to": "2024-07", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-07", "to": "2024-05", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "65626", "entity name": "San Juan Solar I, LLC", "plant producer type": "IPP", "plant name": "San Juan Solar I", "plant state": "NM", "plant id": "66574", "generator id": "SJSS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66574", "date": "2024-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-05", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "San Juan Solar I", "name_short": "San Juan Solar I", "owner": "San Juan Solar I, LLC", "state": "new mexico", "country": "usa", "lat": "36.804042", "long": "-108.445356", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.804042+-108.445356", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cascade", "city": "Stockton", "id": "112", "external_id": "61801", "state": "california", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "PG&E", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "SYL Battery (Risen Energy)", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-24", "start_construction": "", "start_operation": "", "start_estimated": "2022Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.921103", "long": "-121.24114", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://ceqanet.opr.ca.gov/2020090414/2", "link2": "https://www.energy-storage.news/broad-reach-power-orders-118mwh-ess-equipment-for-california-project-from-syl-battery/", "link3": "", "link4": ""}, "internal_id": "112", "external_id": "61801", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cascade Energy Storage, LLC", "external_id": "61801", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Engie North America", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-05", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"10002": {"first": {"year": "2022", "month": "12", "entity id": "59380", "entity name": "Enel Green Power NA, Inc.", "plant producer type": "IPP", "plant name": "Cascade Energy Storage, LLC", "plant state": "CA", "plant id": "61801", "generator id": "10002", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "61801", "date": "2022-12", "mw": 25}, "first_month": "2020-09", "changes": [{"month": "2021-04", "li": [{"name": "entity id", "from": "59380", "to": "63883", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Enel Green Power NA, Inc.", "to": "Broad Reach Power", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-12", "to": "2023-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-04", "to": "2023-07", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Cascade Energy Storage, LLC", "plant state": "CA", "plant id": "61801", "generator id": "10002", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "61801", "date": "2024-06", "mw": 25}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-05"}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-05", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Cascade Energy Storage, LLC", "name_short": "Cascade Energy Storage", "owner": "Engie North America", "state": "california", "country": "usa", "lat": "37.921103", "long": "-121.24114", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:37.921103+-121.24114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://ceqanet.opr.ca.gov/2020090414/2", "https://www.energy-storage.news/broad-reach-power-orders-118mwh-ess-equipment-for-california-project-from-syl-battery/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sierra Energy Storage, LLC", "city": "", "id": "200", "external_id": "61803", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Enel Green Power NA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "200", "external_id": "61803", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sierra Energy Storage, LLC", "external_id": "61803", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Engie North America", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"10003": {"first": {"year": "2022", "month": "12", "entity id": "59380", "entity name": "Enel Green Power NA, Inc.", "plant producer type": "IPP", "plant name": "Sierra Energy Storage, LLC", "plant state": "CA", "plant id": "61803", "generator id": "10003", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "61803", "date": "2022-12", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "entity id", "from": "59380", "to": "63883", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Enel Green Power NA, Inc.", "to": "Broad Reach Power", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-03", "to": "2023-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Sierra Energy Storage, LLC", "plant state": "CA", "plant id": "61803", "generator id": "10003", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "61803", "date": "2024-06", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Sierra Energy Storage, LLC", "name_short": "Sierra Energy Storage", "owner": "Engie North America", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chaparral Springs", "city": "", "id": "549", "external_id": "64864", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "549", "external_id": "64864", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Chaparral Springs", "external_id": "64864", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 176, "power_mw": 88, "owner": "Leeward Asset Management, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "2022-02", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"CHAPB": {"first": {"year": "2022", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Chaparral Springs", "plant state": "CA", "plant id": "64864", "generator id": "CHAPB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64864", "date": "2022-12", "mw": 50}, "first_month": "2021-11", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-12", "to": "2023-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "mw", "from": 50, "to": 52, "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Chaparral Springs", "plant state": "CA", "plant id": "64864", "generator id": "CHAPB", "net summer capacity (mw)": "52", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64864", "date": "2024-06", "mw": 52}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": "2022-02"}, "month_disappeared": ""}, "WS3BA": {"first": {"year": "2023", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Chaparral Springs", "plant state": "CA", "plant id": "64864", "generator id": "WS3BA", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64864", "date": "2023-12", "mw": 36}, "first_month": "2023-06", "changes": [{"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Chaparral Springs", "plant state": "CA", "plant id": "64864", "generator id": "WS3BA", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64864", "date": "2024-06", "mw": 36}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 88, "mwh_is_estimate": true, "mwh": 176, "mwh_estimate": 176, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "2022-02", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Chaparral Springs", "name_short": "Chaparral Springs", "owner": "Leeward Asset Management, LLC", "state": "california", "country": "usa", "lat": "41.20858372443624", "long": "-121.56444271153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.20858372443624+-121.56444271153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hummingbird Energy Storage LLC", "city": "", "id": "620", "external_id": "65395", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Hummingbird Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "620", "external_id": "65395", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hummingbird Energy Storage LLC", "external_id": "65395", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Hummingbird Energy Storage, LLC", "status": "construction", "date_first_heard": "2022-03", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HUMB1": {"first": {"year": "2023", "month": "6", "entity id": "64738", "entity name": "Hummingbird Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Hummingbird Energy Storage LLC", "plant state": "CA", "plant id": "65395", "generator id": "HUMB1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65395", "date": "2023-06", "mw": 75}, "first_month": "2022-03", "changes": [{"month": "2022-10", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-12", "to": "2024-06", "extra": "accelerated by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "64738", "entity name": "Hummingbird Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Hummingbird Energy Storage LLC", "plant state": "CA", "plant id": "65395", "generator id": "HUMB1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65395", "date": "2024-06", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-03", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Hummingbird Energy Storage LLC", "name_short": "Hummingbird Energy Storage", "owner": "Hummingbird Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.260049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.260049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dickens", "city": "", "id": "685", "external_id": "65489", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "685", "external_id": "65489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dickens", "external_id": "65489", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DIKNS": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Dickens", "plant state": "TX", "plant id": "65489", "generator id": "DIKNS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65489", "date": "2023-06", "mw": 200}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Dickens", "plant state": "TX", "plant id": "65489", "generator id": "DIKNS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65489", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Dickens", "name_short": "Dickens", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.724054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.724054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hydra", "city": "", "id": "686", "external_id": "65490", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "686", "external_id": "65490", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hydra", "external_id": "65490", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HYDRA": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Hydra", "plant state": "TX", "plant id": "65490", "generator id": "HYDRA", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65490", "date": "2023-06", "mw": 200}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-11", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Hydra", "plant state": "TX", "plant id": "65490", "generator id": "HYDRA", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65490", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Hydra", "name_short": "Hydra", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.73176250275819", "long": "-95.36367096235749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.73176250275819+-95.36367096235749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Paleo", "city": "", "id": "687", "external_id": "65491", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "687", "external_id": "65491", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Paleo", "external_id": "65491", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PALEO": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Paleo", "plant state": "TX", "plant id": "65491", "generator id": "PALEO", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65491", "date": "2023-06", "mw": 200}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Paleo", "plant state": "TX", "plant id": "65491", "generator id": "PALEO", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65491", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Paleo", "name_short": "Paleo", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.70808533623373", "long": "-95.45800256921983", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.70808533623373+-95.45800256921983", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pavo", "city": "", "id": "688", "external_id": "65492", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "175", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "688", "external_id": "65492", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pavo", "external_id": "65492", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 350, "power_mw": 175, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PAVO": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Pavo", "plant state": "TX", "plant id": "65492", "generator id": "PAVO", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65492", "date": "2023-06", "mw": 175}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-11", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Pavo", "plant state": "TX", "plant id": "65492", "generator id": "PAVO", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65492", "date": "2024-06", "mw": 175}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 175, "mwh_is_estimate": true, "mwh": 350, "mwh_estimate": 350, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Pavo", "name_short": "Pavo", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.65154984477027", "long": "-95.54526771010998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65154984477027+-95.54526771010998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tortolas", "city": "", "id": "689", "external_id": "65493", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "689", "external_id": "65493", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Tortolas", "external_id": "65493", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TORTO": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Tortolas", "plant state": "TX", "plant id": "65493", "generator id": "TORTO", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65493", "date": "2023-06", "mw": 50}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Tortolas", "plant state": "TX", "plant id": "65493", "generator id": "TORTO", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65493", "date": "2024-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Tortolas", "name_short": "Tortolas", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.56468208398623", "long": "-95.61391623283366", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.56468208398623+-95.61391623283366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "San Jacinto Grid, LLC", "city": "", "id": "707", "external_id": "65657", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "65", "customer": "", "owner": "San Jacinto Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "707", "external_id": "65657", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "San Jacinto Grid, LLC", "external_id": "65657", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 130, "power_mw": 65, "owner": "San Jacinto Grid, LLC", "status": "construction", "date_first_heard": "2022-06", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HESJG": {"first": {"year": "2023", "month": "3", "entity id": "64936", "entity name": "San Jacinto Grid, LLC", "plant producer type": "IPP", "plant name": "San Jacinto Grid, LLC", "plant state": "CA", "plant id": "65657", "generator id": "HESJG", "net summer capacity (mw)": "65", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65657", "date": "2023-03", "mw": 65}, "first_month": "2022-06", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-03", "to": "2024-06", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "64936", "entity name": "San Jacinto Grid, LLC", "plant producer type": "IPP", "plant name": "San Jacinto Grid, LLC", "plant state": "CA", "plant id": "65657", "generator id": "HESJG", "net summer capacity (mw)": "65", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65657", "date": "2024-06", "mw": 65}, "current_month": "2024-06", "dates": {"first_heard": "2022-06", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 65, "mwh_is_estimate": true, "mwh": 130, "mwh_estimate": 130, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-06", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "San Jacinto Grid, LLC", "name_short": "San Jacinto Grid", "owner": "San Jacinto Grid, LLC", "state": "california", "country": "usa", "lat": "41.24726561713374", "long": "-121.39056792885305", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.24726561713374+-121.39056792885305", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Octans", "city": "", "id": "716", "external_id": "65590", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "716", "external_id": "65590", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Octans", "external_id": "65590", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OCTNS": {"first": {"year": "2024", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Octans", "plant state": "TX", "plant id": "65590", "generator id": "OCTNS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65590", "date": "2024-06", "mw": 125}, "first_month": "2022-05", "changes": [{"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Octans", "plant state": "TX", "plant id": "65590", "generator id": "OCTNS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65590", "date": "2024-06", "mw": 125}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Octans", "name_short": "Octans", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.309493409523135", "long": "-95.226467416855", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.309493409523135+-95.226467416855", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sierra Estrella Energy Storage", "city": "", "id": "851", "external_id": "66334", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "276", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.410648", "long": "-112.313765", "coords_hint": "1", "use_case": "", "notes": "got the location from the map on the projects page / nr of megapacks from the pdf", "project_website": "https://www.sierraestrellaenergystorage.com/about", "link1": "https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf", "link2": "", "link3": "", "link4": ""}, "internal_id": "851", "external_id": "66334", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sierra Estrella Energy Storage", "external_id": "66334", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Sierra Estrella Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS3": {"first": {"year": "2024", "month": "6", "entity id": "65418", "entity name": "Sierra Estrella Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Sierra Estrella Energy Storage", "plant state": "AZ", "plant id": "66334", "generator id": "BESS3", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66334", "date": "2024-06", "mw": 250}, "first_month": "2023-03", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65418", "entity name": "Sierra Estrella Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Sierra Estrella Energy Storage", "plant state": "AZ", "plant id": "66334", "generator id": "BESS3", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66334", "date": "2024-06", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 500, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Sierra Estrella Energy Storage", "name_short": "Sierra Estrella", "owner": "Sierra Estrella Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "33.410648", "long": "-112.313765", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.410648+-112.313765", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 276, "notes_split": ["got the location from the map on the projects page / nr of megapacks from the pdf"], "links": ["https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Superstition Energy Storage", "city": "Gilbert", "id": "852", "external_id": "66333", "state": "arizona", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "", "power_mw": "90", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.358927", "long": "-111.831039", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.superstitionenergystorage.com/about", "link1": "https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "852", "external_id": "66333", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Superstition Energy Storage", "external_id": "66333", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 180, "power_mw": 90, "owner": "Superstition Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS4": {"first": {"year": "2024", "month": "6", "entity id": "65419", "entity name": "Superstition Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Superstition Energy Storage", "plant state": "AZ", "plant id": "66333", "generator id": "BESS4", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66333", "date": "2024-06", "mw": 90}, "first_month": "2023-03", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65419", "entity name": "Superstition Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Superstition Energy Storage", "plant state": "AZ", "plant id": "66333", "generator id": "BESS4", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66333", "date": "2024-06", "mw": 90}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 90, "mwh_is_estimate": false, "mwh": 360, "mwh_estimate": 180, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Superstition Energy Storage", "name_short": "Superstition", "owner": "Superstition Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "33.358927", "long": "-111.831039", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.358927+-111.831039", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Black Mesa BESS", "city": "", "id": "969", "external_id": "66326", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "969", "external_id": "66326", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Black Mesa BESS", "external_id": "66326", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Idaho Power Co", "status": "construction", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Black Mesa BESS", "plant state": "ID", "plant id": "66326", "generator id": "1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66326", "date": "2023-06", "mw": 40}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Black Mesa BESS", "plant state": "ID", "plant id": "66326", "generator id": "1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66326", "date": "2024-06", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Black Mesa BESS", "name_short": "Black Mesa", "owner": "Idaho Power Co", "state": "idaho", "country": "usa", "lat": "44.361601404211235", "long": "-112.97622197218186", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.361601404211235+-112.97622197218186", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Callisto I Energy Center", "city": "", "id": "997", "external_id": "66338", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Callisto I Energy Center", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "997", "external_id": "66338", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Callisto I Energy Center", "external_id": "66338", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Callisto I Energy Center", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CALL1": {"first": {"year": "2024", "month": "6", "entity id": "65428", "entity name": "Callisto I Energy Center", "plant producer type": "IPP", "plant name": "Callisto I Energy Center", "plant state": "TX", "plant id": "66338", "generator id": "CALL1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66338", "date": "2024-06", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65428", "entity name": "Callisto I Energy Center", "plant producer type": "IPP", "plant name": "Callisto I Energy Center", "plant state": "TX", "plant id": "66338", "generator id": "CALL1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66338", "date": "2024-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Callisto I Energy Center", "name_short": "Callisto I", "owner": "Callisto I Energy Center", "state": "texas", "country": "usa", "lat": "33.183842323878764", "long": "-95.07711772573431", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.183842323878764+-95.07711772573431", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brazos Bend BESS, LLC", "city": "", "id": "1031", "external_id": "66690", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Brazos Bend BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1031", "external_id": "66690", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Brazos Bend BESS, LLC", "external_id": "66690", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Brazos Bend BESS, LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BEND": {"first": {"year": "2024", "month": "6", "entity id": "65696", "entity name": "Brazos Bend BESS, LLC", "plant producer type": "IPP", "plant name": "Brazos Bend BESS, LLC", "plant state": "TX", "plant id": "66690", "generator id": "BEND", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66690", "date": "2024-06", "mw": 100}, "first_month": "2023-07", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65696", "entity name": "Brazos Bend BESS, LLC", "plant producer type": "IPP", "plant name": "Brazos Bend BESS, LLC", "plant state": "TX", "plant id": "66690", "generator id": "BEND", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66690", "date": "2024-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Brazos Bend BESS, LLC", "name_short": "Brazos Bend BESS", "owner": "Brazos Bend BESS, LLC", "state": "texas", "country": "usa", "lat": "33.428714606461256", "long": "-95.3514246343362", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.428714606461256+-95.3514246343362", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Baldy Mesa 2_Silver Peak Hybrid", "city": "", "id": "1040", "external_id": "66885", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1040", "external_id": "66885", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Baldy Mesa 2_Silver Peak Hybrid", "external_id": "66885", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SPKBS": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Baldy Mesa 2_Silver Peak Hybrid", "plant state": "CA", "plant id": "66885", "generator id": "SPKBS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66885", "date": "2023-12", "mw": 25}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2024-06", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Baldy Mesa 2_Silver Peak Hybrid", "plant state": "CA", "plant id": "66885", "generator id": "SPKBS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66885", "date": "2024-06", "mw": 25}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Baldy Mesa 2_Silver Peak Hybrid", "name_short": "Baldy Mesa 2_Silver Peak", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.220049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.220049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Borden County BESS", "city": "", "id": "1054", "external_id": "66804", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Borden County Battery Energy Storage System LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1054", "external_id": "66804", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Borden County BESS", "external_id": "66804", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Borden County Battery Energy Storage System LLC", "status": "construction", "date_first_heard": "2023-08", "start_construction": "2024-01", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "5", "entity id": "65765", "entity name": "Borden County Battery Energy Storage System LLC", "plant producer type": "IPP", "plant name": "Borden County BESS", "plant state": "TX", "plant id": "66804", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66804", "date": "2024-05", "mw": 150}, "first_month": "2023-08", "changes": [{"month": "2024-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "65765", "entity name": "Borden County Battery Energy Storage System LLC", "plant producer type": "IPP", "plant name": "Borden County BESS", "plant state": "TX", "plant id": "66804", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66804", "date": "2024-06", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": "2024-01"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-08", "start_construction": "2024-01", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Borden County BESS", "name_short": "Borden County", "owner": "Borden County Battery Energy Storage System LLC", "state": "texas", "country": "usa", "lat": "33.27525537493651", "long": "-95.3315331949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.27525537493651+-95.3315331949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fence Post Solar Hybrid Project, LLC", "city": "", "id": "1061", "external_id": "66801", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "144", "power_mw": "72", "customer": "", "owner": "Fence Post Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1061", "external_id": "66801", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Fence Post Solar Hybrid Project, LLC", "external_id": "66801", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 144, "power_mw": 72, "owner": "Fence Post Solar Project, LLC", "status": "construction", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FNCBE": {"first": {"year": "2024", "month": "3", "entity id": "65774", "entity name": "Fence Post Solar Project, LLC", "plant producer type": "IPP", "plant name": "Fence Post Solar Hybrid Project, LLC", "plant state": "TX", "plant id": "66801", "generator id": "FNCBE", "net summer capacity (mw)": "72", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66801", "date": "2024-03", "mw": 72}, "first_month": "2023-08", "changes": [{"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "65774", "entity name": "Fence Post Solar Project, LLC", "plant producer type": "IPP", "plant name": "Fence Post Solar Hybrid Project, LLC", "plant state": "TX", "plant id": "66801", "generator id": "FNCBE", "net summer capacity (mw)": "72", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66801", "date": "2024-06", "mw": 72}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 72, "mwh_is_estimate": true, "mwh": 144, "mwh_estimate": 144, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Fence Post Solar Hybrid Project, LLC", "name_short": "Fence Post Solar Hybrid Project", "owner": "Fence Post Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.49793441320124", "long": "-95.13838797468608", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.49793441320124+-95.13838797468608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Butler", "city": "", "id": "1185", "external_id": "67042", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1185", "external_id": "67042", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Butler", "external_id": "67042", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "North Carolina El Member Corp", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT1": {"first": {"year": "2024", "month": "8", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "Butler", "plant state": "NC", "plant id": "67042", "generator id": "BAT1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67042", "date": "2024-08", "mw": 10}, "first_month": "2023-12", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-08", "to": "2024-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "Butler", "plant state": "NC", "plant id": "67042", "generator id": "BAT1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67042", "date": "2024-06", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Butler", "name_short": "Butler", "owner": "North Carolina El Member Corp", "state": "north carolina", "country": "usa", "lat": "36.596042000000004", "long": "-76.876831", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.596042000000004+-76.876831", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Franklin Solar Hybrid", "city": "", "id": "1314", "external_id": "67190", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Franklin Solar Idaho", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1314", "external_id": "67190", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Franklin Solar Hybrid", "external_id": "67190", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Franklin Solar Idaho", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FBESS": {"first": {"year": "2024", "month": "6", "entity id": "66071", "entity name": "Franklin Solar Idaho", "plant producer type": "IPP", "plant name": "Franklin Solar Hybrid", "plant state": "ID", "plant id": "67190", "generator id": "FBESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67190", "date": "2024-06", "mw": 100}, "first_month": "2024-02", "changes": [{"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "66071", "entity name": "Franklin Solar Idaho", "plant producer type": "IPP", "plant name": "Franklin Solar Hybrid", "plant state": "ID", "plant id": "67190", "generator id": "FBESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67190", "date": "2024-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Franklin Solar Hybrid", "name_short": "Franklin Solar", "owner": "Franklin Solar Idaho", "state": "idaho", "country": "usa", "lat": "44.16061989624012", "long": "-112.7071598353925", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.16061989624012+-112.7071598353925", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eleven Mile Solar Center", "city": "", "id": "1323", "external_id": "66263", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Eleven Mile Solar Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1323", "external_id": "66263", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eleven Mile Solar Center", "external_id": "66263", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Eleven Mile Solar Center, LLC", "status": "construction", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"2222": {"first": {"year": "2024", "month": "6", "entity id": "65368", "entity name": "Eleven Mile Solar Center, LLC", "plant producer type": "IPP", "plant name": "Eleven Mile Solar Center", "plant state": "AZ", "plant id": "66263", "generator id": "2222", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66263", "date": "2024-06", "mw": 300}, "first_month": "2024-03", "changes": [{"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65368", "entity name": "Eleven Mile Solar Center, LLC", "plant producer type": "IPP", "plant name": "Eleven Mile Solar Center", "plant state": "AZ", "plant id": "66263", "generator id": "2222", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66263", "date": "2024-06", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Eleven Mile Solar Center", "name_short": "Eleven Mile Solar Center", "owner": "Eleven Mile Solar Center, LLC", "state": "arizona", "country": "usa", "lat": "36.56418480140374", "long": "-109.822948763257", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.56418480140374+-109.822948763257", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sun Streams 3", "city": "", "id": "1326", "external_id": "67285", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "430", "power_mw": "215", "customer": "", "owner": "Sun Streams PVS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1326", "external_id": "67285", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sun Streams 3", "external_id": "67285", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 430, "power_mw": 215, "owner": "Sun Streams PVS, LLC", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2024", "month": "6", "entity id": "66151", "entity name": "Sun Streams PVS, LLC", "plant producer type": "IPP", "plant name": "Sun Streams 3", "plant state": "AZ", "plant id": "67285", "generator id": "GEN02", "net summer capacity (mw)": "215", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67285", "date": "2024-06", "mw": 215}, "first_month": "2024-04", "changes": [], "current": {"year": "2024", "month": "6", "entity id": "66151", "entity name": "Sun Streams PVS, LLC", "plant producer type": "IPP", "plant name": "Sun Streams 3", "plant state": "AZ", "plant id": "67285", "generator id": "GEN02", "net summer capacity (mw)": "215", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67285", "date": "2024-06", "mw": 215}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 215, "mwh_is_estimate": true, "mwh": 430, "mwh_estimate": 430, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Sun Streams 3", "name_short": "Sun Streams 3", "owner": "Sun Streams PVS, LLC", "state": "arizona", "country": "usa", "lat": "36.642010720802766", "long": "-109.9384049230325", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.642010720802766+-109.9384049230325", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Apache Solar 1", "city": "", "id": "1334", "external_id": "60964", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Electric Pwr Coop Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1334", "external_id": "60964", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Apache Solar 1", "external_id": "60964", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Arizona Electric Pwr Coop Inc", "status": "construction", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AEPB1": {"first": {"year": "2024", "month": "6", "entity id": "796", "entity name": "Arizona Electric Pwr Coop Inc", "plant producer type": "Electric Utility", "plant name": "Apache Solar 1", "plant state": "AZ", "plant id": "60964", "generator id": "AEPB1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "60964", "date": "2024-06", "mw": 10}, "first_month": "2024-06", "changes": [], "current": {"year": "2024", "month": "6", "entity id": "796", "entity name": "Arizona Electric Pwr Coop Inc", "plant producer type": "Electric Utility", "plant name": "Apache Solar 1", "plant state": "AZ", "plant id": "60964", "generator id": "AEPB1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "60964", "date": "2024-06", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Apache Solar 1", "name_short": "Apache Solar 1", "owner": "Arizona Electric Pwr Coop Inc", "state": "arizona", "country": "usa", "lat": "36.33767263558831", "long": "-109.9309885151675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.33767263558831+-109.9309885151675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bromley Battery Storage", "city": "", "id": "1339", "external_id": "67305", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1339", "external_id": "67305", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bromley Battery Storage", "external_id": "67305", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "United Power, Inc", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BROBA": {"first": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Bromley Battery Storage", "plant state": "CO", "plant id": "67305", "generator id": "BROBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67305", "date": "2024-05", "mw": 11}, "first_month": "2024-04", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Bromley Battery Storage", "plant state": "CO", "plant id": "67305", "generator id": "BROBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67305", "date": "2024-06", "mw": 11}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Bromley Battery Storage", "name_short": "Bromley", "owner": "United Power, Inc", "state": "colorado", "country": "usa", "lat": "40.552849615451265", "long": "-102.47130241879584", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.552849615451265+-102.47130241879584", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Anemoi Energy Storage", "city": "", "id": "1356", "external_id": "67236", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Anemoi Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1356", "external_id": "67236", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Anemoi Energy Storage", "external_id": "67236", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Anemoi Energy Storage, LLC", "status": "construction", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ANEM1": {"first": {"year": "2024", "month": "5", "entity id": "66110", "entity name": "Anemoi Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Anemoi Energy Storage", "plant state": "TX", "plant id": "67236", "generator id": "ANEM1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67236", "date": "2024-05", "mw": 200}, "first_month": "2024-03", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "66110", "entity name": "Anemoi Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Anemoi Energy Storage", "plant state": "TX", "plant id": "67236", "generator id": "ANEM1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67236", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Anemoi Energy Storage", "name_short": "Anemoi", "owner": "Anemoi Energy Storage, LLC", "state": "texas", "country": "usa", "lat": "33.23340888821952", "long": "-95.20174605730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.23340888821952+-95.20174605730502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ebony Energy Storage", "city": "", "id": "1357", "external_id": "67237", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Ebony Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1357", "external_id": "67237", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ebony Energy Storage", "external_id": "67237", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Ebony Energy Storage, LLC", "status": "construction", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"EBON1": {"first": {"year": "2024", "month": "6", "entity id": "66111", "entity name": "Ebony Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Ebony Energy Storage", "plant state": "TX", "plant id": "67237", "generator id": "EBON1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67237", "date": "2024-06", "mw": 200}, "first_month": "2024-03", "changes": [], "current": {"year": "2024", "month": "6", "entity id": "66111", "entity name": "Ebony Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Ebony Energy Storage", "plant state": "TX", "plant id": "67237", "generator id": "EBON1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67237", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Ebony Energy Storage", "name_short": "Ebony", "owner": "Ebony Energy Storage, LLC", "state": "texas", "country": "usa", "lat": "33.24856368342876", "long": "-95.12414054591771", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.24856368342876+-95.12414054591771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Big Star", "city": "Bastrop County", "id": "42", "external_id": "64202", "state": "texas", "country": "usa", "capacity_mwh": "120", "estimate_mwh": "", "power_mw": "80", "customer": "RWE Renewables", "owner": "", "developer": "", "manufacturer": "LG", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.913908", "long": "-97.289792", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/rwe-signs-up-corporate-offtaker-for-big-star-texas-solar-plus-storage-project/", "link2": "https://www.rwe.com/en/press/rwe-renewables/2021-08-25-rwe-teams-up-with-constellation-to-supply-major-us-commercial-customers-with-solar-energy-from-big-star-facility", "link3": "", "link4": ""}, "internal_id": "42", "external_id": "64202", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Big Star Solar, LLC (Hybrid)", "external_id": "64202", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "RWE Renewables Americas, LLC", "status": "construction", "date_first_heard": "2021-01", "start_construction": "2021-06", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BGSTB": {"first": {"year": "2022", "month": "4", "entity id": "56215", "entity name": "RWE Renewables Americas LLC", "plant producer type": "IPP", "plant name": "Big Star Solar, LLC", "plant state": "TX", "plant id": "64202", "generator id": "BGSTB", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64202", "date": "2022-04", "mw": 80}, "first_month": "2021-01", "changes": [{"month": "2021-02", "li": [{"name": "plant name", "from": "Big Star Solar, LLC", "to": "Big Star Solar, LLC (Hybrid)", "extra": "", "change_type": "misc"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2022-05", "to": "2022-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-04", "to": "2022-11", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-12", "to": "2023-08", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "entity name", "from": "RWE Renewables Americas LLC", "to": "RWE Renewables Americas, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-12", "to": "2024-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-04", "to": "2024-02", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2024-02", "to": "2024-01", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "56215", "entity name": "RWE Renewables Americas, LLC", "plant producer type": "IPP", "plant name": "Big Star Solar, LLC (Hybrid)", "plant state": "TX", "plant id": "64202", "generator id": "BGSTB", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64202", "date": "2024-05", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": false, "mwh": 120, "mwh_estimate": 160, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-01", "start_construction": "2021-06", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Big Star Solar, LLC (Hybrid)", "name_short": "Big Star Solar, LLC (Hybrid)", "owner": "RWE Renewables Americas, LLC", "state": "texas", "country": "usa", "lat": "29.913908", "long": "-97.289792", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:29.913908+-97.289792", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/rwe-signs-up-corporate-offtaker-for-big-star-texas-solar-plus-storage-project/", "https://www.rwe.com/en/press/rwe-renewables/2021-08-25-rwe-teams-up-with-constellation-to-supply-major-us-commercial-customers-with-solar-energy-from-big-star-facility"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dry Lake", "city": "Clark County", "id": "108", "external_id": "63933", "state": "nevada", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "NV Energy", "developer": "NV Energy", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.419928", "long": "-114.895856", "coords_hint": "1", "use_case": "150mw solar farm support", "notes": "in the planning doc, they list 3 BESS options, picked option 1 for the coordinates (but might be wrong)", "project_website": "", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/2000468/510", "link3": "", "link4": ""}, "internal_id": "108", "external_id": "63933", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dry Lake Solar Energy Center", "external_id": "63933", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Nevada Power Co", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2023-02", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DLES1": {"first": {"year": "2023", "month": "12", "entity id": "63603", "entity name": "Nevada Power Company DBA NV Energy", "plant producer type": "Electric Utility", "plant name": "Dry Lake Solar Energy Center", "plant state": "NV", "plant id": "63933", "generator id": "DLES1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63933", "date": "2023-12", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "entity id", "from": "63603", "to": "13407", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Nevada Power Company DBA NV Energy", "to": "Nevada Power Co", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "13407", "entity name": "Nevada Power Co", "plant producer type": "Electric Utility", "plant name": "Dry Lake Solar Energy Center", "plant state": "NV", "plant id": "63933", "generator id": "DLES1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "63933", "date": "2024-05", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2023-02"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2023-02", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Dry Lake Solar Energy Center", "name_short": "Dry Lake Solar", "owner": "Nevada Power Co", "state": "nevada", "country": "usa", "lat": "36.419928", "long": "-114.895856", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.419928+-114.895856", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["in the planning doc, they list 3 BESS options, picked option 1 for the coordinates (but might be wrong)"], "links": ["https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "https://eplanning.blm.gov/eplanning-ui/project/2000468/510"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES Maui Kuihelani Solar Hybrid", "city": "", "id": "211", "external_id": "64256", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "211", "external_id": "64256", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES Maui Kuihelani Solar Hybrid", "external_id": "64256", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "AES Distributed Energy", "status": "construction", "date_first_heard": "2021-01", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KLNIB": {"first": {"year": "2022", "month": "12", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Maui Kuihelani Solar Hybrid", "plant state": "HI", "plant id": "64256", "generator id": "KLNIB", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64256", "date": "2022-12", "mw": 60}, "first_month": "2021-01", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2022-12", "to": "2023-10", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Maui Kuihelani Solar Hybrid", "plant state": "HI", "plant id": "64256", "generator id": "KLNIB", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64256", "date": "2024-05", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-01", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "AES Maui Kuihelani Solar Hybrid", "name_short": "AES Maui Kuihelani Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.59886628623625", "long": "-155.55347937368438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.59886628623625+-155.55347937368438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mossy Branch Battery Facility", "city": "", "id": "556", "external_id": "65018", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "65", "customer": "", "owner": "Georgia Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "556", "external_id": "65018", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mossy Branch Battery Facility", "external_id": "65018", "state": "georgia", "country": "usa", "mwh": 0, "estimate_mwh": 130, "power_mw": 65, "owner": "Georgia Power Co", "status": "construction", "date_first_heard": "2021-11", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "10", "entity id": "7140", "entity name": "Georgia Power Co", "plant producer type": "Electric Utility", "plant name": "Mossy Branch Battery Facility", "plant state": "GA", "plant id": "65018", "generator id": "BESS", "net summer capacity (mw)": "65", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65018", "date": "2023-10", "mw": 65}, "first_month": "2021-11", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2023-10", "to": "2024-05", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "5", "entity id": "7140", "entity name": "Georgia Power Co", "plant producer type": "Electric Utility", "plant name": "Mossy Branch Battery Facility", "plant state": "GA", "plant id": "65018", "generator id": "BESS", "net summer capacity (mw)": "65", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65018", "date": "2024-05", "mw": 65}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 65, "mwh_is_estimate": true, "mwh": 130, "mwh_estimate": 130, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Mossy Branch Battery Facility", "name_short": "Mossy Branch Battery Facility", "owner": "Georgia Power Co", "state": "georgia", "country": "usa", "lat": "31.98394488821953", "long": "-81.92751505730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.98394488821953+-81.92751505730502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Santa Paula Energy Storage LLC", "city": "", "id": "621", "external_id": "65397", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Santa Paula Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "621", "external_id": "65397", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Santa Paula Energy Storage LLC", "external_id": "65397", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Santa Paula Energy Storage, LLC", "status": "construction", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SP1": {"first": {"year": "2022", "month": "11", "entity id": "64740", "entity name": "Santa Paula Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Santa Paula Energy Storage LLC", "plant state": "CA", "plant id": "65397", "generator id": "SP1", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65397", "date": "2022-11", "mw": 30}, "first_month": "2022-03", "changes": [{"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-11", "to": "2023-03", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-09", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64740", "entity name": "Santa Paula Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Santa Paula Energy Storage LLC", "plant state": "CA", "plant id": "65397", "generator id": "SP1", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65397", "date": "2024-05", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Santa Paula Energy Storage LLC", "name_short": "Santa Paula Energy Storage", "owner": "Santa Paula Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.14183605365125", "long": "-121.2410834959897", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.14183605365125+-121.2410834959897", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vikings Energy Farm", "city": "", "id": "697", "external_id": "65711", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Vikings Energy Farm, LLC", "developer": "arevon", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.804395", "long": "-115.274713", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/viking/", "link1": "https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "link2": "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/", "link3": "", "link4": ""}, "internal_id": "697", "external_id": "65711", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vikings Energy Farm", "external_id": "65711", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Vikings Energy Farm, LLC", "status": "construction", "date_first_heard": "2022-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN2": {"first": {"year": "2023", "month": "12", "entity id": "64966", "entity name": "Vikings Energy Farm, LLC", "plant producer type": "IPP", "plant name": "Vikings Energy Farm", "plant state": "CA", "plant id": "65711", "generator id": "GEN2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65711", "date": "2023-12", "mw": 150}, "first_month": "2022-07", "changes": [{"month": "2023-02", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-08", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-02", "extra": "accelerated by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64966", "entity name": "Vikings Energy Farm, LLC", "plant producer type": "IPP", "plant name": "Vikings Energy Farm", "plant state": "CA", "plant id": "65711", "generator id": "GEN2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65711", "date": "2024-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Vikings Energy Farm", "name_short": "Vikings Energy Farm", "owner": "Vikings Energy Farm, LLC", "state": "california", "country": "usa", "lat": "32.804395", "long": "-115.274713", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.804395+-115.274713", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ortega Grid, LLC", "city": "", "id": "711", "external_id": "65656", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Ortega Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "711", "external_id": "65656", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ortega Grid, LLC", "external_id": "65656", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Ortega Grid, LLC", "status": "construction", "date_first_heard": "2022-06", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HEORG": {"first": {"year": "2023", "month": "3", "entity id": "64935", "entity name": "Ortega Grid, LLC", "plant producer type": "IPP", "plant name": "Ortega Grid, LLC", "plant state": "CA", "plant id": "65656", "generator id": "HEORG", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65656", "date": "2023-03", "mw": 20}, "first_month": "2022-06", "changes": [{"month": "2022-09", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-03", "to": "2023-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-08", "to": "2023-11", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-01", "to": "2024-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64935", "entity name": "Ortega Grid, LLC", "plant producer type": "IPP", "plant name": "Ortega Grid, LLC", "plant state": "CA", "plant id": "65656", "generator id": "HEORG", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65656", "date": "2024-05", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2022-06", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-06", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Ortega Grid, LLC", "name_short": "Ortega Grid", "owner": "Ortega Grid, LLC", "state": "california", "country": "usa", "lat": "41.10969828623625", "long": "-121.3399933736844", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.10969828623625+-121.3399933736844", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Energy Desert Storage 1 LLC", "city": "", "id": "712", "external_id": "65635", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Energy Desert Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "712", "external_id": "65635", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Energy Desert Storage 1 LLC", "external_id": "65635", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Hecate Energy Desert Storage 1 LLC", "status": "construction", "date_first_heard": "2022-06", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HEDS1": {"first": {"year": "2022", "month": "12", "entity id": "64937", "entity name": "Hecate Energy Desert Storage 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Desert Storage 1 LLC", "plant state": "CA", "plant id": "65635", "generator id": "HEDS1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65635", "date": "2022-12", "mw": 10}, "first_month": "2022-06", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2022-12", "to": "2023-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-09", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-01", "to": "2024-05", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64937", "entity name": "Hecate Energy Desert Storage 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Desert Storage 1 LLC", "plant state": "CA", "plant id": "65635", "generator id": "HEDS1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65635", "date": "2024-05", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2022-06", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-06", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Hecate Energy Desert Storage 1 LLC", "name_short": "Hecate Energy Desert Storage 1", "owner": "Hecate Energy Desert Storage 1 LLC", "state": "california", "country": "usa", "lat": "41.08505874385328", "long": "-121.35182608763999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.08505874385328+-121.35182608763999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carris Storage I", "city": "", "id": "713", "external_id": "65733", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Grid Carris Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "713", "external_id": "65733", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Carris Storage I", "external_id": "65733", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Hecate Grid Carris Storage 1 LLC", "status": "construction", "date_first_heard": "2022-08", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HECAR": {"first": {"year": "2022", "month": "12", "entity id": "64978", "entity name": "Hecate Grid Carris Storage 1 LLC", "plant producer type": "IPP", "plant name": "Carris Storage I", "plant state": "CA", "plant id": "65733", "generator id": "HECAR", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65733", "date": "2022-12", "mw": 10}, "first_month": "2022-08", "changes": [{"month": "2022-09", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-09", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2024-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-05", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64978", "entity name": "Hecate Grid Carris Storage 1 LLC", "plant producer type": "IPP", "plant name": "Carris Storage I", "plant state": "CA", "plant id": "65733", "generator id": "HECAR", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65733", "date": "2024-05", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2022-08", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-08", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Carris Storage I", "name_short": "Carris Storage I", "owner": "Hecate Grid Carris Storage 1 LLC", "state": "california", "country": "usa", "lat": "41.05310153848376", "long": "-121.35059853169716", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.05310153848376+-121.35059853169716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Condor", "city": "", "id": "864", "external_id": "66285", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.020505", "long": "-117.332255", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/condor/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/", "link2": "", "link3": "", "link4": ""}, "internal_id": "864", "external_id": "66285", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Condor Energy Storage LLC", "external_id": "66285", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Condor Energy Storage LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"COND1": {"first": {"year": "2024", "month": "8", "entity id": "65397", "entity name": "Condor Energy Storage LLC", "plant producer type": "IPP", "plant name": "Condor Energy Storage LLC", "plant state": "CA", "plant id": "66285", "generator id": "COND1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66285", "date": "2024-08", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-03", "extra": "accelerated by 5 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65397", "entity name": "Condor Energy Storage LLC", "plant producer type": "IPP", "plant name": "Condor Energy Storage LLC", "plant state": "CA", "plant id": "66285", "generator id": "COND1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66285", "date": "2024-05", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Condor Energy Storage LLC", "name_short": "Condor Energy Storage", "owner": "Condor Energy Storage LLC", "state": "california", "country": "usa", "lat": "34.020505", "long": "-117.332255", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.020505+-117.332255", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Five Wells Solar Center - Hybrid", "city": "", "id": "981", "external_id": "66420", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "518", "power_mw": "259", "customer": "", "owner": "Five Wells Solar Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "981", "external_id": "66420", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Five Wells Solar Center - Hybrid", "external_id": "66420", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 518, "power_mw": 259, "owner": "Five Wells Solar Center, LLC", "status": "construction", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FWBAT": {"first": {"year": "2024", "month": "3", "entity id": "65502", "entity name": "Five Wells Solar Center, LLC", "plant producer type": "IPP", "plant name": "Five Wells Solar Center - Hybrid", "plant state": "TX", "plant id": "66420", "generator id": "FWBAT", "net summer capacity (mw)": "259", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66420", "date": "2024-03", "mw": 259}, "first_month": "2023-04", "changes": [{"month": "2023-06", "li": [{"name": "entity id", "from": "65502", "to": "65507", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Five Wells Solar Center, LLC", "to": "Chesapeake Solar Project, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "entity id", "from": "65507", "to": "65502", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Chesapeake Solar Project, LLC", "to": "Five Wells Solar Center, LLC", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2023-12", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65502", "entity name": "Five Wells Solar Center, LLC", "plant producer type": "IPP", "plant name": "Five Wells Solar Center - Hybrid", "plant state": "TX", "plant id": "66420", "generator id": "FWBAT", "net summer capacity (mw)": "259", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66420", "date": "2024-05", "mw": 259}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 259, "mwh_is_estimate": true, "mwh": 518, "mwh_estimate": 518, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Five Wells Solar Center - Hybrid", "name_short": "Five Wells Solar Center", "owner": "Five Wells Solar Center, LLC", "state": "texas", "country": "usa", "lat": "33.51029509297624", "long": "-95.10034571403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.51029509297624+-95.10034571403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cald BESS", "city": "", "id": "1012", "external_id": "66617", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Cald BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1012", "external_id": "66617", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cald BESS", "external_id": "66617", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Cald BESS LLC", "status": "construction", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "5", "entity id": "65643", "entity name": "Cald BESS LLC", "plant producer type": "IPP", "plant name": "Cald BESS", "plant state": "CA", "plant id": "66617", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66617", "date": "2024-05", "mw": 100}, "first_month": "2023-06", "changes": [{"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "5", "entity id": "65643", "entity name": "Cald BESS LLC", "plant producer type": "IPP", "plant name": "Cald BESS", "plant state": "CA", "plant id": "66617", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66617", "date": "2024-05", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Cald BESS", "name_short": "Cald", "owner": "Cald BESS LLC", "state": "california", "country": "usa", "lat": "41.08505874385328", "long": "-121.35182608763999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.08505874385328+-121.35182608763999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Ford Flat", "city": "", "id": "1020", "external_id": "66669", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "West Ford Flat Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1020", "external_id": "66669", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "West Ford Flat", "external_id": "66669", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "West Ford Flat Energy Storage", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2023-12", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WFF1": {"first": {"year": "2024", "month": "3", "entity id": "65675", "entity name": "West Ford Flat Energy Storage", "plant producer type": "IPP", "plant name": "West Ford Flat", "plant state": "CA", "plant id": "66669", "generator id": "WFF1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66669", "date": "2024-03", "mw": 25}, "first_month": "2023-07", "changes": [{"month": "2023-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65675", "entity name": "West Ford Flat Energy Storage", "plant producer type": "IPP", "plant name": "West Ford Flat", "plant state": "CA", "plant id": "66669", "generator id": "WFF1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66669", "date": "2024-05", "mw": 25}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-12"}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2023-12", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "West Ford Flat", "name_short": "West Ford Flat", "owner": "West Ford Flat Energy Storage", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.260049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.260049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bear Canyon", "city": "", "id": "1021", "external_id": "66650", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "13", "customer": "", "owner": "Bear Canyon Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1021", "external_id": "66650", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bear Canyon", "external_id": "66650", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 26, "power_mw": 13, "owner": "Bear Canyon Energy Storage", "status": "construction", "date_first_heard": "2023-06", "start_construction": "2023-12", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BC1": {"first": {"year": "2024", "month": "3", "entity id": "65674", "entity name": "Bear Canyon Energy Storage", "plant producer type": "IPP", "plant name": "Bear Canyon", "plant state": "CA", "plant id": "66650", "generator id": "BC1", "net summer capacity (mw)": "13", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66650", "date": "2024-03", "mw": 13}, "first_month": "2023-06", "changes": [{"month": "2023-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65674", "entity name": "Bear Canyon Energy Storage", "plant producer type": "IPP", "plant name": "Bear Canyon", "plant state": "CA", "plant id": "66650", "generator id": "BC1", "net summer capacity (mw)": "13", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66650", "date": "2024-05", "mw": 13}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": "2023-12"}, "month_disappeared": ""}}, "mw": 13, "mwh_is_estimate": true, "mwh": 26, "mwh_estimate": 26, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06", "start_construction": "2023-12", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Bear Canyon", "name_short": "Bear Canyon", "owner": "Bear Canyon Energy Storage", "state": "california", "country": "usa", "lat": "41.14183605365125", "long": "-121.2410834959897", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.14183605365125+-121.2410834959897", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Raceway Solar & Storage", "city": "", "id": "1036", "external_id": "66773", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1036", "external_id": "66773", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Raceway Solar & Storage", "external_id": "66773", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2023-08", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RCWYB": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Raceway Solar & Storage", "plant state": "CA", "plant id": "66773", "generator id": "RCWYB", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66773", "date": "2023-12", "mw": 80}, "first_month": "2023-08", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-05", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Raceway Solar & Storage", "plant state": "CA", "plant id": "66773", "generator id": "RCWYB", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66773", "date": "2024-05", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-08", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Raceway Solar & Storage", "name_short": "Raceway Solar &", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "40.94007414887133", "long": "-121.24071773708002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94007414887133+-121.24071773708002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lockhart ESS, LLC", "city": "", "id": "1181", "external_id": "66946", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "45", "customer": "", "owner": "Terra-Gen Operating Co-Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1181", "external_id": "66946", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lockhart ESS, LLC", "external_id": "66946", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 90, "power_mw": 45, "owner": "Terra-Gen Operating Co-Solar", "status": "construction", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LHESS": {"first": {"year": "2024", "month": "6", "entity id": "61950", "entity name": "Terra-Gen Operating Co-Solar", "plant producer type": "IPP", "plant name": "Lockhart ESS, LLC", "plant state": "CA", "plant id": "66946", "generator id": "LHESS", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66946", "date": "2024-06", "mw": 45}, "first_month": "2023-10", "changes": [{"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-06", "to": "2024-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "61950", "entity name": "Terra-Gen Operating Co-Solar", "plant producer type": "IPP", "plant name": "Lockhart ESS, LLC", "plant state": "CA", "plant id": "66946", "generator id": "LHESS", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66946", "date": "2024-05", "mw": 45}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 45, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Lockhart ESS, LLC", "name_short": "Lockhart ESS", "owner": "Terra-Gen Operating Co-Solar", "state": "california", "country": "usa", "lat": "41.17891809297625", "long": "-121.12695671403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17891809297625+-121.12695671403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McLauchin", "city": "", "id": "1183", "external_id": "67041", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1183", "external_id": "67041", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McLauchin", "external_id": "67041", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "North Carolina El Member Corp", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT1": {"first": {"year": "2024", "month": "8", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "McLauchin", "plant state": "NC", "plant id": "67041", "generator id": "BAT1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67041", "date": "2024-08", "mw": 15}, "first_month": "2023-12", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-08", "to": "2024-05", "extra": "accelerated by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "McLauchin", "plant state": "NC", "plant id": "67041", "generator id": "BAT1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67041", "date": "2024-05", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "McLauchin", "name_short": "McLauchin", "owner": "North Carolina El Member Corp", "state": "north carolina", "country": "usa", "lat": "36.50887984072874", "long": "-76.7439915329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.50887984072874+-76.7439915329819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yellow Pine II", "city": "", "id": "1186", "external_id": "67091", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "106", "power_mw": "53", "customer": "", "owner": "Yellow Pine Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1186", "external_id": "67091", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Yellow Pine II", "external_id": "67091", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 170, "power_mw": 85, "owner": "Yellow Pine Solar II, LLC", "status": "construction", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"YP2AB": {"first": {"year": "2024", "month": "5", "entity id": "65968", "entity name": "Yellow Pine Solar II, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine II", "plant state": "NV", "plant id": "67091", "generator id": "YP2AB", "net summer capacity (mw)": "53", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67091", "date": "2024-05", "mw": 53}, "first_month": "2024-01", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "65968", "entity name": "Yellow Pine Solar II, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine II", "plant state": "NV", "plant id": "67091", "generator id": "YP2AB", "net summer capacity (mw)": "53", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67091", "date": "2024-05", "mw": 53}, "current_month": "2024-06", "dates": {"first_heard": "2024-01", "start_construction": null}, "month_disappeared": ""}, "YP2BB": {"first": {"year": "2024", "month": "5", "entity id": "65968", "entity name": "Yellow Pine Solar II, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine II", "plant state": "NV", "plant id": "67091", "generator id": "YP2BB", "net summer capacity (mw)": "32", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67091", "date": "2024-05", "mw": 32}, "first_month": "2024-03", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "65968", "entity name": "Yellow Pine Solar II, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine II", "plant state": "NV", "plant id": "67091", "generator id": "YP2BB", "net summer capacity (mw)": "32", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67091", "date": "2024-05", "mw": 32}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 85, "mwh_is_estimate": true, "mwh": 170, "mwh_estimate": 170, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Yellow Pine II", "name_short": "Yellow Pine II", "owner": "Yellow Pine Solar II, LLC", "state": "nevada", "country": "usa", "lat": "41.82110450275819", "long": "-114.9962389623575", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.82110450275819+-114.9962389623575", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Copperhead Solar, LLC", "city": "", "id": "1189", "external_id": "67019", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "National Grid Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1189", "external_id": "67019", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Copperhead Solar, LLC", "external_id": "67019", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "National Grid Renewables", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CHSTG": {"first": {"year": "2024", "month": "3", "entity id": "62759", "entity name": "National Grid Renewables", "plant producer type": "IPP", "plant name": "Copperhead Solar, LLC", "plant state": "TX", "plant id": "67019", "generator id": "CHSTG", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67019", "date": "2024-03", "mw": 100}, "first_month": "2023-12", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "62759", "entity name": "National Grid Renewables", "plant producer type": "IPP", "plant name": "Copperhead Solar, LLC", "plant state": "TX", "plant id": "67019", "generator id": "CHSTG", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67019", "date": "2024-05", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Copperhead Solar, LLC", "name_short": "Copperhead Solar", "owner": "National Grid Renewables", "state": "texas", "country": "usa", "lat": "33.56468208398623", "long": "-95.61391623283366", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.56468208398623+-95.61391623283366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Paulsell", "city": "", "id": "1309", "external_id": "67092", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Crow Creek Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1309", "external_id": "67092", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Paulsell", "external_id": "67092", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Crow Creek Solar, LLC", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PSLBA": {"first": {"year": "2024", "month": "2", "entity id": "65965", "entity name": "Crow Creek Solar, LLC", "plant producer type": "IPP", "plant name": "Paulsell", "plant state": "CA", "plant id": "67092", "generator id": "PSLBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67092", "date": "2024-02", "mw": 15}, "first_month": "2024-02", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "5", "entity id": "65965", "entity name": "Crow Creek Solar, LLC", "plant producer type": "IPP", "plant name": "Paulsell", "plant state": "CA", "plant id": "67092", "generator id": "PSLBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67092", "date": "2024-05", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Paulsell", "name_short": "Paulsell", "owner": "Crow Creek Solar, LLC", "state": "california", "country": "usa", "lat": "41.183862364886245", "long": "-121.48835819022644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.183862364886245+-121.48835819022644", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Keenesburg Battery Storage", "city": "", "id": "1341", "external_id": "67306", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1341", "external_id": "67306", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Keenesburg Battery Storage", "external_id": "67306", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "United Power, Inc", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KEEBA": {"first": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Keenesburg Battery Storage", "plant state": "CO", "plant id": "67306", "generator id": "KEEBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67306", "date": "2024-05", "mw": 11}, "first_month": "2024-04", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Keenesburg Battery Storage", "plant state": "CO", "plant id": "67306", "generator id": "KEEBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67306", "date": "2024-05", "mw": 11}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Keenesburg Battery Storage", "name_short": "Keenesburg", "owner": "United Power, Inc", "state": "colorado", "country": "usa", "lat": "40.664095733426244", "long": "-102.61966723533789", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.664095733426244+-102.61966723533789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rattlesnake Ridge Battery Storage", "city": "", "id": "1342", "external_id": "67300", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1342", "external_id": "67300", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rattlesnake Ridge Battery Storage", "external_id": "67300", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "United Power, Inc", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RATBA": {"first": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Rattlesnake Ridge Battery Storage", "plant state": "CO", "plant id": "67300", "generator id": "RATBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67300", "date": "2024-05", "mw": 11}, "first_month": "2024-04", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Rattlesnake Ridge Battery Storage", "plant state": "CO", "plant id": "67300", "generator id": "RATBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67300", "date": "2024-05", "mw": 11}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Rattlesnake Ridge Battery Storage", "name_short": "Rattlesnake Ridge", "owner": "United Power, Inc", "state": "colorado", "country": "usa", "lat": "40.705461371284265", "long": "-102.6163568926975", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.705461371284265+-102.6163568926975", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cavalry Solar Hybrid", "city": "", "id": "1347", "external_id": "67489", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "45", "customer": "", "owner": "Cavalry Energy Center LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1347", "external_id": "67489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cavalry Solar Hybrid", "external_id": "67489", "state": "indiana", "country": "usa", "mwh": 0, "estimate_mwh": 90, "power_mw": 45, "owner": "Cavalry Energy Center LLC", "status": "construction", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CAVBS": {"first": {"year": "2024", "month": "5", "entity id": "66219", "entity name": "Cavalry Energy Center LLC", "plant producer type": "Electric Utility", "plant name": "Cavalry Solar Hybrid", "plant state": "IN", "plant id": "67489", "generator id": "CAVBS", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67489", "date": "2024-05", "mw": 45}, "first_month": "2024-06", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "66219", "entity name": "Cavalry Energy Center LLC", "plant producer type": "Electric Utility", "plant name": "Cavalry Solar Hybrid", "plant state": "IN", "plant id": "67489", "generator id": "CAVBS", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67489", "date": "2024-05", "mw": 45}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 45, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Cavalry Solar Hybrid", "name_short": "Cavalry Solar", "owner": "Cavalry Energy Center LLC", "state": "indiana", "country": "usa", "lat": "41.53444497668374", "long": "-85.46987974903644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.53444497668374+-85.46987974903644", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gateway Energy Project", "city": "London Gateway port/ essex", "id": "57", "external_id": "10309", "state": "", "country": "uk", "capacity_mwh": "900", "estimate_mwh": "", "power_mw": "320", "customer": "Intergen", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Gridstack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.512649", "long": "0.493992", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.intergen.com/our-technologies/development-projects/gateway-energy-centre/", "link1": "https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec", "link2": "", "link3": "", "link4": ""}, "internal_id": "57", "external_id": "10309", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gateway Energy Centre - Battery Energy Storage", "external_id": "10309", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 450, "power_mw": 450, "owner": "Intergen Limited", "status": "planning", "date_first_heard": "2023-01-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.510099", "long": "0.495058", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10309", "Record Last Updated (dd/mm/yyyy)": "17/12/2021", "Operator (or Applicant)": "Gateway Energy Centre Limited", "Site Name": "Baltic Avenue - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "450.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "East 2 Baltic Avenue Stanford Le Hope ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS17 9FF", "X-coordinate": "573240", "Y-coordinate": "181970", "Planning Authority": "Thurrock District Council", "Planning Application Reference": "21/01971/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.510099", "long": "0.495058", "status": "planning", "mw": 450, "ext_id": "10309"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Operator (or Applicant)", "from": "Gateway Energy Centre Limited", "to": "Intergen Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Baltic Avenue - Battery Energy Storage", "to": "Gateway Energy Centre - Battery Energy Storage", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/12/2021", "to": "30/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "13/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/01/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/01/2023", "to": "17/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10309", "Record Last Updated (dd/mm/yyyy)": "17/12/2021", "Operator (or Applicant)": "Intergen Limited", "Site Name": "Gateway Energy Centre - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "450", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East 2 Baltic Avenue Stanford Le Hope ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS17 9FF", "X-coordinate": "573240", "Y-coordinate": "181970", "Planning Authority": "Thurrock District Council", "Planning Application Reference": "21/01971/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/01/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.510099", "long": "0.495058", "status": "planning", "mw": 450, "ext_id": "10309"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 450, "mwh_is_estimate": false, "mwh": 900, "mwh_estimate": 450, "status": "planning", "status_class": "", "date_first_heard": "2023-01-13", "start_construction": "", "start_operation": "", "start_estimated": "2024", "month_disappeared": "", "go_live": "0 ~ 2024", "go_live_year_int": 2024, "name": "Gateway Energy Centre - Battery Energy Storage", "name_short": "Gateway Energy Centre", "owner": "Intergen Limited", "state": "eastern", "country": "uk", "lat": "51.510099", "long": "0.495058", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.510099+0.495058", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Quartize", "city": "Riverside County", "id": "60", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "", "customer": "EDF / Clean Power Alliance", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-15", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.586379", "long": "-114.785106", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "", "link1": "https://eplanning.blm.gov/eplanning-ui/project/68211/570", "link2": "https://www.blm.gov/press-release/blm-approves-desert-quartzite-solar-project-riverside-county", "link3": "https://www.energy-storage.news/california-community-group-signs-ppa-for-edfs-300mw-desert-quartzite-solar-plus-storage-project/", "link4": ""}, "internal_id": "60", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-01-15", "start_construction": "", "start_operation": "", "start_estimated": "2024", "month_disappeared": "", "go_live": "0 ~ 2024", "go_live_year_int": 2024, "name": "Desert Quartize", "name_short": "Desert Quartize", "owner": "", "state": "california", "country": "usa", "lat": "33.586379", "long": "-114.785106", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.586379+-114.785106", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://eplanning.blm.gov/eplanning-ui/project/68211/570", "https://www.blm.gov/press-release/blm-approves-desert-quartzite-solar-project-riverside-county", "https://www.energy-storage.news/california-community-group-signs-ppa-for-edfs-300mw-desert-quartzite-solar-plus-storage-project/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Goyder", "city": "Burra", "id": "567", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "", "estimate_mwh": "1800", "power_mw": "900", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-15", "start_construction": "2022-01-17", "start_operation": "", "start_estimated": "2024", "cost_million": "3000", "cost_currency": "AUD", "cost_incl_solar": "1", "lat": "-33.649566", "long": "139.000287", "coords_hint": "-1", "use_case": "1200MW wind farm support ** 600MW solar support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/neoen-begins-goyder-renewables-zone-wind-solar-storage-hybrid-project-in-south-australia/", "link2": "", "link3": "", "link4": ""}, "internal_id": "567", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 900, "mwh_is_estimate": true, "mwh": 1800, "mwh_estimate": 1800, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-03-15", "start_construction": "2022-01-17", "start_operation": "", "start_estimated": "2024", "month_disappeared": "", "go_live": "0 ~ 2024", "go_live_year_int": 2024, "name": "Goyder", "name_short": "Goyder", "owner": "neoen", "state": "south australia", "country": "australia", "lat": "-33.649566", "long": "139.000287", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.649566+139.000287", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/neoen-begins-goyder-renewables-zone-wind-solar-storage-hybrid-project-in-south-australia/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Iron Point", "city": "Humboldt County", "id": "106", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "NV Energy", "developer": "Primergy Solar (Quinbrook)", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.900046", "long": "-117.291845", "coords_hint": "1", "use_case": "250MW solar farm support", "notes": "", "project_website": "", "link1": "https://eplanning.blm.gov/eplanning-ui/project/2000966", "link2": "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "link3": "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/", "link4": ""}, "internal_id": "106", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "0 ~ 2023Q4", "go_live_year_int": 2023, "name": "Iron Point", "name_short": "Iron Point", "owner": "NV Energy", "state": "nevada", "country": "usa", "lat": "40.900046", "long": "-117.291845", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.900046+-117.291845", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://eplanning.blm.gov/eplanning-ui/project/2000966", "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rusholme Grange Resubmission", "city": "Selby", "id": "489", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "70", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.73122", "long": "-0.94159", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00", "link3": "", "link4": ""}, "internal_id": "489", "external_id": "9121", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rusholme Grange ", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Harmony Energy Storage", "status": "planning", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9121", "Record Last Updated (dd/mm/yyyy)": "07/06/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rusholme Grange Resubmission", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/0601/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 40, "ext_id": "9121"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2021", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire", "to": "Rusholme Grange, Rusholme Lane, Drax, Selby", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "19/12/2017", "to": "03/09/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Site Name", "from": "Rusholme Grange Resubmission", "to": "Rusholme Grange ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/09/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9121", "Record Last Updated (dd/mm/yyyy)": "13/12/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rusholme Grange ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7093", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/0601/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 40, "ext_id": "9121"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": false, "mwh": 70, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "month_disappeared": "", "go_live": "0 ~ 2023Q3", "go_live_year_int": 2023, "name": "Rusholme Grange ", "name_short": "Rusholme Grange ", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.73117+-0.937436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Torrens Island", "city": "Adelaide", "id": "80", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "AGL Energy Limited", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-09-08", "start_construction": "2021-11-29", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.803262", "long": "138.523477", "coords_hint": "0", "use_case": "", "notes": "might become a 4h / 1000MWh system at a later stage, the coords are probably correct from the satellite image", "project_website": "", "link1": "https://www.wartsila.com/media/news/09-08-2021-agl-and-wartsila-advance-frame-agreement-with-first-energy-storage-project-on-path-to-grid-decarbonisation-2954567", "link2": "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-media-release---agl-breaks-ground-for-torrens-island-grid-sc", "link3": "", "link4": ""}, "internal_id": "80", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-09-08", "start_construction": "2021-11-29", "start_operation": "", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "0 ~ 2023Q1", "go_live_year_int": 2023, "name": "Torrens Island", "name_short": "Torrens Island", "owner": "", "state": "south australia", "country": "australia", "lat": "-34.803262", "long": "138.523477", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.803262+138.523477", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["might become a 4h / 1000MWh system at a later stage, the coords are probably correct from the satellite image"], "links": ["https://www.wartsila.com/media/news/09-08-2021-agl-and-wartsila-advance-frame-agreement-with-first-energy-storage-project-on-path-to-grid-decarbonisation-2954567", "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-media-release---agl-breaks-ground-for-torrens-island-grid-sc"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Poolbeg", "city": "Dublin", "id": "120", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "75", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.338696", "long": "-6.205066", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://blog.fluenceenergy.com/esb-fluence-complete-deal-largest-energy-storage-portfolio-europe", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "120", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 75, "mwh_is_estimate": false, "mwh": 150, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "0 ~ 2023Q1", "go_live_year_int": 2023, "name": "Poolbeg", "name_short": "Poolbeg", "owner": "ESB", "state": "", "country": "ireland", "lat": "53.338696", "long": "-6.205066", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.338696+-6.205066", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Wall", "city": "Dublin", "id": "121", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "60", "estimate_mwh": "", "power_mw": "30", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.338662", "long": "-6.191852", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://blog.fluenceenergy.com/esb-fluence-complete-deal-largest-energy-storage-portfolio-europe", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "121", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 30, "mwh_is_estimate": false, "mwh": 60, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "0 ~ 2023Q1", "go_live_year_int": 2023, "name": "South Wall", "name_short": "South Wall", "owner": "ESB", "state": "", "country": "ireland", "lat": "53.338662", "long": "-6.191852", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.338662+-6.191852", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Boulder Solar III", "city": "Clark County", "id": "109", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "232", "estimate_mwh": "", "power_mw": "58", "customer": "", "owner": "NV Energy", "developer": "174 PowerGlobal / KOMIPO", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.827801", "long": "-114.947397", "coords_hint": "0", "use_case": "128MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "", "link3": "", "link4": ""}, "internal_id": "109", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 58, "mwh_is_estimate": false, "mwh": 232, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "month_disappeared": "", "go_live": "0 ~ 2023", "go_live_year_int": 2023, "name": "Boulder Solar III", "name_short": "Boulder Solar III", "owner": "NV Energy", "state": "nevada", "country": "usa", "lat": "35.827801", "long": "-114.947397", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.827801+-114.947397", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Great Western Battery", "city": "Wallerawang", "id": "568", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "500", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-18", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.397397", "long": "150.067853", "coords_hint": "1", "use_case": "coal plant replacement", "notes": "exact location from scoping report pdf", "project_website": "https://greatwesternbattery.com.au", "link1": "https://www.energy-storage.news/great-western-battery-1000mwh-project-proposed-to-aid-reliability-in-australias-post-coal-age/", "link2": "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "link3": "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-12346552%2120201223T043129.182%20GMT", "link4": ""}, "internal_id": "568", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 500, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-01-18", "start_construction": "", "start_operation": "", "start_estimated": "2023", "month_disappeared": "", "go_live": "0 ~ 2023", "go_live_year_int": 2023, "name": "Great Western Battery", "name_short": "Great Western Battery", "owner": "neoen", "state": "new south wales", "country": "australia", "lat": "-33.397397", "long": "150.067853", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.397397+150.067853", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["exact location from scoping report pdf"], "links": ["https://www.energy-storage.news/great-western-battery-1000mwh-project-proposed-to-aid-reliability-in-australias-post-coal-age/", "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-12346552%2120201223T043129.182%20GMT"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wallerawang 9", "city": "Wallerawang", "id": "569", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "500", "customer": "", "owner": "greenspot", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "400", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "-33.407503", "long": "150.091529", "coords_hint": "1", "use_case": "coal plant replacement", "notes": "exact location from the pdf in sources", "project_website": "https://www.greenspot.com.au/news/wallerawang-9-battery-project-scoping-report/", "link1": "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "link2": "https://www.greenspot.com.au/news/uploads/wallerawang-9-battery-project-scoping-report.pdf", "link3": "", "link4": ""}, "internal_id": "569", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 500, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "2023", "month_disappeared": "", "go_live": "0 ~ 2023", "go_live_year_int": 2023, "name": "Wallerawang 9", "name_short": "Wallerawang 9", "owner": "greenspot", "state": "new south wales", "country": "australia", "lat": "-33.407503", "long": "150.091529", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.407503+150.091529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["exact location from the pdf in sources"], "links": ["https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "https://www.greenspot.com.au/news/uploads/wallerawang-9-battery-project-scoping-report.pdf"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jicarilla", "city": "", "id": "102", "external_id": "", "state": "new mexico", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "93", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.269283", "long": "-107.562816", "coords_hint": "0", "use_case": "50MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, "internal_id": "102", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "0 ~ 2022Q4", "go_live_year_int": 2022, "name": "Jicarilla", "name_short": "Jicarilla", "owner": "", "state": "new mexico", "country": "usa", "lat": "36.269283", "long": "-107.562816", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.269283+-107.562816", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "201LC 8me", "city": "", "id": "104", "external_id": "", "state": "new mexico", "country": "usa", "capacity_mwh": "120", "estimate_mwh": "", "power_mw": "30", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "188", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.619911", "long": "-107.815013", "coords_hint": "0", "use_case": "100MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, "internal_id": "104", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 30, "mwh_is_estimate": false, "mwh": 120, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "0 ~ 2022Q4", "go_live_year_int": 2022, "name": "201LC 8me", "name_short": "201LC 8me", "owner": "", "state": "new mexico", "country": "usa", "lat": "35.619911", "long": "-107.815013", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.619911+-107.815013", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thailand (name tbd)", "city": "", "id": "134", "external_id": "", "state": "", "country": "thailand", "capacity_mwh": "136", "estimate_mwh": "", "power_mw": "45", "customer": "", "owner": "Super Energy", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "14.334678", "long": "100.052398", "coords_hint": "0", "use_case": "49MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/sungrow-is-supplier-to-thai-solar-plus-storage-project-featuring-southeast-asias-biggest-bess/", "link2": "", "link3": "", "link4": ""}, "internal_id": "134", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 45, "mwh_is_estimate": false, "mwh": 136, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "0 ~ 2022Q4", "go_live_year_int": 2022, "name": "Thailand (name tbd)", "name_short": "Thailand (name tbd)", "owner": "Super Energy", "state": "", "country": "thailand", "lat": "14.334678", "long": "100.052398", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:14.334678+100.052398", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/sungrow-is-supplier-to-thai-solar-plus-storage-project-featuring-southeast-asias-biggest-bess/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Waikato (name tbd)", "city": "", "id": "137", "external_id": "", "state": "", "country": "new zealand", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "WEL Networks", "developer": "Infratec", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-10-18", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "17", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "-37.519913", "long": "175.054654", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/new-zealands-first-grid-scale-battery-storage-system-project-nears-start-of-construction/", "link2": "", "link3": "", "link4": ""}, "internal_id": "137", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 35, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2021-10-18", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Waikato (name tbd)", "name_short": "Waikato (name tbd)", "owner": "WEL Networks", "state": "", "country": "new zealand", "lat": "-37.519913", "long": "175.054654", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-37.519913+175.054654", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/new-zealands-first-grid-scale-battery-storage-system-project-nears-start-of-construction/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hazelwood", "city": "LaTrobe Valley", "id": "138", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "Macquarie\u2019s Green Investment Group / Engie", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-12-01", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.271456", "long": "146.390309", "coords_hint": "0", "use_case": "at coal power plant", "notes": "will benefit from unused transmission capacity of old power plant", "project_website": "", "link1": "https://www.energy-storage.news/150mw-privately-funded-battery-project-is-latest-in-australia-to-repurpose-fossil-fuel-plant-site/", "link2": "", "link3": "", "link4": ""}, "internal_id": "138", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 150, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2021-12-01", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Hazelwood", "name_short": "Hazelwood", "owner": "Macquarie\u2019s Green Investment Group / Engie", "state": "victoria", "country": "australia", "lat": "-38.271456", "long": "146.390309", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-38.271456+146.390309", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["will benefit from unused transmission capacity of old power plant"], "links": ["https://www.energy-storage.news/150mw-privately-funded-battery-project-is-latest-in-australia-to-repurpose-fossil-fuel-plant-site/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vilnius", "city": "", "id": "139", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "54.651925", "long": "25.240645", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, "internal_id": "139", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Vilnius", "name_short": "Vilnius", "owner": "EPSO-G / Energy Cells", "state": "", "country": "lithuania", "lat": "54.651925", "long": "25.240645", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.651925+25.240645", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["split capacity and costs in 4 projects, only the sum mentioned in article"], "links": ["https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Siauliai", "city": "", "id": "140", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "55.916586", "long": "23.307078", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, "internal_id": "140", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Siauliai", "name_short": "Siauliai", "owner": "EPSO-G / Energy Cells", "state": "", "country": "lithuania", "lat": "55.916586", "long": "23.307078", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.916586+23.307078", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["split capacity and costs in 4 projects, only the sum mentioned in article"], "links": ["https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alytus", "city": "", "id": "141", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "54.405809", "long": "24.011371", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, "internal_id": "141", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Alytus", "name_short": "Alytus", "owner": "EPSO-G / Energy Cells", "state": "", "country": "lithuania", "lat": "54.405809", "long": "24.011371", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.405809+24.011371", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["split capacity and costs in 4 projects, only the sum mentioned in article"], "links": ["https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Utena", "city": "", "id": "142", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "55.505378", "long": "25.595541", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, "internal_id": "142", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Utena", "name_short": "Utena", "owner": "EPSO-G / Energy Cells", "state": "", "country": "lithuania", "lat": "55.505378", "long": "25.595541", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.505378+25.595541", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["split capacity and costs in 4 projects, only the sum mentioned in article"], "links": ["https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn Solar Storage", "city": "Kern County", "id": "68", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "2445", "estimate_mwh": "", "power_mw": "346", "customer": "Terra-Gen", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "LG & Samsung", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-12-10", "start_construction": "2021-02-01", "start_operation": "", "start_estimated": "2022Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.911468", "long": "-117.889716", "coords_hint": "0", "use_case": "1118 MW solar farm support", "notes": "735 MWh in Q3 '21, 1501 MWh by Q2 2022.", "project_website": "", "link1": "https://renewablesnow.com/news/terra-gen-secures-usd-800m-for-massive-solar-storage-project-in-california-749635/", "link2": "https://pv-magazine-usa.com/2021/08/02/terra-gen-secures-800-million-in-financing-for-solar-storage-project-in-california/", "link3": "https://pv-magazine-usa.com/2020/12/11/morning-brief-big-home-batteries-from-lg-energy-terra-gen-and-mortenson-start-on-worlds-largest-standalone-solar-and-storage-project/", "link4": ""}, "internal_id": "68", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 346, "mwh_is_estimate": false, "mwh": 2445, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-12-10", "start_construction": "2021-02-01", "start_operation": "", "start_estimated": "2022Q2", "month_disappeared": "", "go_live": "0 ~ 2022Q2", "go_live_year_int": 2022, "name": "Edwards Sanborn Solar Storage", "name_short": "Edwards Sanborn Solar", "owner": "", "state": "california", "country": "usa", "lat": "34.911468", "long": "-117.889716", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.911468+-117.889716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["735 MWh in Q3 '21, 1501 MWh by Q2 2022."], "links": ["https://renewablesnow.com/news/terra-gen-secures-usd-800m-for-massive-solar-storage-project-in-california-749635/", "https://pv-magazine-usa.com/2021/08/02/terra-gen-secures-800-million-in-financing-for-solar-storage-project-in-california/", "https://pv-magazine-usa.com/2020/12/11/morning-brief-big-home-batteries-from-lg-energy-terra-gen-and-mortenson-start-on-worlds-largest-standalone-solar-and-storage-project/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aghada", "city": "Cork", "id": "122", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "38", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.833728", "long": "-8.237095", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.pv-magazine.com/2021/01/08/irish-esb-to-add-100-mwh-of-fluence-storage-to-its-portfolio/", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "122", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 38, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "month_disappeared": "", "go_live": "0 ~ 2022Q1", "go_live_year_int": 2022, "name": "Aghada", "name_short": "Aghada", "owner": "ESB", "state": "", "country": "ireland", "lat": "51.833728", "long": "-8.237095", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.833728+-8.237095", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Inchicore", "city": "Dublin", "id": "123", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "60", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.335521", "long": "-6.336714", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.pv-magazine.com/2021/01/08/irish-esb-to-add-100-mwh-of-fluence-storage-to-its-portfolio/", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "123", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 60, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "month_disappeared": "", "go_live": "0 ~ 2022Q1", "go_live_year_int": 2022, "name": "Inchicore", "name_short": "Inchicore", "owner": "ESB", "state": "", "country": "ireland", "lat": "53.335521", "long": "-6.336714", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.335521+-6.336714", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Burwell", "city": "Burwell", "id": "125", "external_id": "7272", "state": "cambridgeshire", "country": "uk", "capacity_mwh": "56", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "SMS Plc", "manufacturer": "Trina Storage / CATL", "type": "", "cells": "CATL LFP", "no_of_battery_units": "157", "status": "construction", "date_first_heard": "2021-10-12", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.27859", "long": "0.316193", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/energy-storage-product-launches-in-europe-from-major-chinese-solar-companies-trina-sungrow/", "link2": "https://www.youtube.com/watch?v=PT1vRQdYuzE", "link3": "", "link4": ""}, "internal_id": "125", "external_id": "7272", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Burwell Main Sub-Station", "external_id": "7272", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Aura Power / Pivot Power", "status": "planning", "date_first_heard": "2019-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.279248", "long": "0.314266", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7272", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Aura Power / Pivot Power", "Site Name": "Burwell Main Sub-Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, Cambridgeshire", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0BP", "X-coordinate": "557976", "Y-coordinate": "267089", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "19/00155/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.279248", "long": "0.314266", "status": "planning", "mw": 49, "ext_id": "7272"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, Cambridgeshire", "to": "Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "29/04/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7272", "Record Last Updated (dd/mm/yyyy)": "29/04/2019", "Operator (or Applicant)": "Aura Power / Pivot Power", "Site Name": "Burwell Main Sub-Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9292", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0BP", "X-coordinate": "557976", "Y-coordinate": "267089", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "19/00155/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.279248", "long": "0.314266", "status": "planning", "mw": 49, "ext_id": "7272"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 56, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-04-29", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "month_disappeared": "", "go_live": "0 ~ 2022Q1", "go_live_year_int": 2022, "name": "Burwell Main Sub-Station", "name_short": "Burwell Main Sub-Station", "owner": "Aura Power / Pivot Power", "state": "eastern", "country": "uk", "lat": "52.279248", "long": "0.314266", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.279248+0.314266", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 157, "notes_split": [""], "links": ["https://www.energy-storage.news/energy-storage-product-launches-in-europe-from-major-chinese-solar-companies-trina-sungrow/", "https://www.youtube.com/watch?v=PT1vRQdYuzE"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Werne", "city": "Werne", "id": "83", "external_id": "SEE971932533266", "state": "nrw", "country": "germany", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "72", "customer": "RWE", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-26", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.674854", "long": "7.712175", "coords_hint": "0", "use_case": "frequency balancing", "notes": "", "project_website": "", "link1": "https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "link2": "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "link3": "", "link4": ""}, "internal_id": "83", "external_id": "SEE971932533266", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicher Werne", "external_id": "SEE971932533266", "state": "nrw", "country": "germany", "mwh": 72, "estimate_mwh": "", "power_mw": 72, "owner": "RWE Generation SE", "status": "planning", "date_first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31", "month_disappeared": "", "lat": "51.673240", "long": "7.710467", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4667306"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE971932533266", "DatumLetzteAktualisierung": "2021-09-27T10:17:37.0101370", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR907042335667", "Land": "84", "Bundesland": "1409", "Landkreis": "Unna", "Gemeinde": "Werne", "Gemeindeschluessel": "05978040", "Postleitzahl": "59368", "Strasse": "Hammer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Werne", "Laengengrad": "7.710467", "Breitengrad": "51.673240", "Registrierungsdatum": "2021-09-27", "GeplantesInbetriebnahmedatum": "2022-12-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Werne", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "72500.000", "Nettonennleistung": "72500.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911844000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "100000.000", "SpeMastrNummer": "SSE949518558477", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 72, "pr_url_id": "4667306", "ext_id": "SEE971932533266", "mw": 72, "status": "planning"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE971932533266", "DatumLetzteAktualisierung": "2021-09-27T10:17:37.0101370", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR907042335667", "Land": "84", "Bundesland": "1409", "Landkreis": "Unna", "Gemeinde": "Werne", "Gemeindeschluessel": "05978040", "Postleitzahl": "59368", "Strasse": "Hammer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Werne", "Laengengrad": "7.710467", "Breitengrad": "51.673240", "Registrierungsdatum": "2021-09-27", "GeplantesInbetriebnahmedatum": "2022-12-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Werne", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "72500.000", "Nettonennleistung": "72500.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911844000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "100000.000", "SpeMastrNummer": "SSE949518558477", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4667306", "owner": "RWE Generation SE", "mwh": 72, "ext_id": "SEE971932533266", "mw": 72, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31"}}, "mw": 72, "mwh_is_estimate": false, "mwh": 72, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31", "month_disappeared": "", "go_live": "0 ~ 2022-12", "go_live_year_int": 2022, "name": "Batteriespeicher Werne", "name_short": "Batteriespeicher Werne", "owner": "RWE Generation SE", "state": "nrw", "country": "germany", "lat": "51.673240", "long": "7.710467", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.673240+7.710467", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4667306"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lingen / Emsland", "city": "Lingen", "id": "84", "external_id": "SEE905843309764", "state": "lower saxony", "country": "germany", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "45", "customer": "RWE", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-26", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.481565", "long": "7.300968", "coords_hint": "0", "use_case": "frequency balancing", "notes": "", "project_website": "", "link1": "https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "link2": "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "link3": "", "link4": ""}, "internal_id": "84", "external_id": "SEE905843309764", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicher Emsland", "external_id": "SEE905843309764", "state": "lower saxony", "country": "germany", "mwh": 45, "estimate_mwh": "", "power_mw": 45, "owner": "RWE Generation SE", "status": "planning", "date_first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31", "month_disappeared": "", "lat": "52.480270", "long": "7.305250", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4667064"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE905843309764", "DatumLetzteAktualisierung": "2021-09-27T10:11:20.2519577", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR907042335667", "Land": "84", "Bundesland": "1408", "Landkreis": "Emsland", "Gemeinde": "Lingen (Ems)", "Gemeindeschluessel": "03454032", "Postleitzahl": "49808", "Strasse": "Sch\u00fcttorfer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "100", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Lingen", "Laengengrad": "7.305250", "Breitengrad": "52.480270", "Registrierungsdatum": "2021-09-27", "GeplantesInbetriebnahmedatum": "2022-12-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Emsland", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "45000.000", "Nettonennleistung": "45000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911844000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "62000.000", "SpeMastrNummer": "SSE975030047267", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 45, "pr_url_id": "4667064", "ext_id": "SEE905843309764", "mw": 45, "status": "planning"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE905843309764", "DatumLetzteAktualisierung": "2021-09-27T10:11:20.2519577", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR907042335667", "Land": "84", "Bundesland": "1408", "Landkreis": "Emsland", "Gemeinde": "Lingen (Ems)", "Gemeindeschluessel": "03454032", "Postleitzahl": "49808", "Strasse": "Sch\u00fcttorfer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "100", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Lingen", "Laengengrad": "7.305250", "Breitengrad": "52.480270", "Registrierungsdatum": "2021-09-27", "GeplantesInbetriebnahmedatum": "2022-12-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Emsland", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "45000.000", "Nettonennleistung": "45000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911844000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "62000.000", "SpeMastrNummer": "SSE975030047267", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4667064", "owner": "RWE Generation SE", "mwh": 45, "ext_id": "SEE905843309764", "mw": 45, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31"}}, "mw": 45, "mwh_is_estimate": false, "mwh": 45, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31", "month_disappeared": "", "go_live": "0 ~ 2022-12", "go_live_year_int": 2022, "name": "Batteriespeicher Emsland", "name_short": "Batteriespeicher Emsland", "owner": "RWE Generation SE", "state": "lower saxony", "country": "germany", "lat": "52.480270", "long": "7.305250", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.480270+7.305250", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4667064"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMAREG4 Wartburgspeicher Eisenach", "city": "", "id": "839", "external_id": "SEE954649497618", "state": "thuringia", "country": "germany", "capacity_mwh": "67", "estimate_mwh": "", "power_mw": "60", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "839", "external_id": "SEE954649497618", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "SMAREG4 Wartburgspeicher Eisenach", "external_id": "SEE954649497618", "state": "thuringia", "country": "germany", "mwh": 67, "estimate_mwh": "", "power_mw": 60, "owner": "SMAREG4", "status": "planning", "date_first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01", "month_disappeared": "", "lat": "51.000210", "long": "10.231150", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5405677"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE954649497618", "DatumLetzteAktualisierung": "2022-11-16T09:47:55.0954518", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR989644624141", "Land": "84", "Bundesland": "1415", "Landkreis": "Eisenach", "Gemeinde": "Eisenach", "Gemeindeschluessel": "16056000", "Postleitzahl": "99817", "Gemarkung": "Stockhausen", "FlurFlurstuecknummern": "Flur 4: 251/4", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Eisenach", "Laengengrad": "10.231150", "Breitengrad": "51.000210", "Registrierungsdatum": "2022-10-18", "GeplantesInbetriebnahmedatum": "2022-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "SMAREG4 Wartburgspeicher Eisenach", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "60000.000", "Nettonennleistung": "60000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE981203149492", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "1", "ZugeordnenteWirkleistungWechselrichter": "60000.000", "SpeMastrNummer": "SSE924723418167", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5405677", "owner": "SMAREG4", "mwh": 67, "ext_id": "SEE954649497618", "mw": 60, "status": "planning"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE954649497618", "DatumLetzteAktualisierung": "2022-11-16T09:47:55.0954518", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR989644624141", "Land": "84", "Bundesland": "1415", "Landkreis": "Eisenach", "Gemeinde": "Eisenach", "Gemeindeschluessel": "16056000", "Postleitzahl": "99817", "Gemarkung": "Stockhausen", "FlurFlurstuecknummern": "Flur 4: 251/4", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Eisenach", "Laengengrad": "10.231150", "Breitengrad": "51.000210", "Registrierungsdatum": "2022-10-18", "GeplantesInbetriebnahmedatum": "2022-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "SMAREG4 Wartburgspeicher Eisenach", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "60000.000", "Nettonennleistung": "60000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE981203149492", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "1", "ZugeordnenteWirkleistungWechselrichter": "60000.000", "SpeMastrNummer": "SSE924723418167", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5405677", "owner": "SMAREG4", "mwh": 67, "ext_id": "SEE954649497618", "mw": 60, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01"}}, "mw": 60, "mwh_is_estimate": false, "mwh": 67, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01", "month_disappeared": "", "go_live": "0 ~ 2022-12", "go_live_year_int": 2022, "name": "SMAREG4 Wartburgspeicher Eisenach", "name_short": "SMAREG4 Wartburgspeicher Eisenach", "owner": "SMAREG4", "state": "thuringia", "country": "germany", "lat": "51.000210", "long": "10.231150", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.000210+10.231150", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5405677"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Buffalo", "city": "", "id": "257", "external_id": "", "state": "", "country": "netherlands", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "GIGA Storage", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "LFP", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.985216", "long": "5.665107", "coords_hint": "2", "use_case": "", "notes": "storage will be rented out to Eneco, STAAS: storage as a service", "project_website": "", "link1": "https://www.energy-storage.news/wartsilas-48mwh-netherlands-bess-will-be-europes-first-large-scale-lfp-battery-project/", "link2": "", "link3": "", "link4": ""}, "internal_id": "257", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 48, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "month_disappeared": "", "go_live": "0 ~ 2022-10", "go_live_year_int": 2022, "name": "Buffalo", "name_short": "Buffalo", "owner": "GIGA Storage", "state": "", "country": "netherlands", "lat": "51.985216", "long": "5.665107", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.985216+5.665107", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["storage will be rented out to Eneco, STAAS: storage as a service"], "links": ["https://www.energy-storage.news/wartsilas-48mwh-netherlands-bess-will-be-europes-first-large-scale-lfp-battery-project/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "B\u00fcttel Speicher", "city": "", "id": "546", "external_id": "SEE984446277410", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "546", "external_id": "SEE984446277410", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "B\u00fcttel Speicher", "external_id": "SEE984446277410", "state": "schleswig-holstein", "country": "germany", "mwh": 4, "estimate_mwh": "", "power_mw": 13, "owner": "ENERPARC Solar Invest 184 GmbH", "status": "planning", "date_first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31", "month_disappeared": "", "lat": "53.913862", "long": "9.218432", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3370616"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE984446277410", "DatumLetzteAktualisierung": "2020-08-26T09:44:58.0831462", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR920405658623", "Land": "84", "Bundesland": "1411", "Landkreis": "Steinburg", "Gemeinde": "B\u00fcttel", "Gemeindeschluessel": "01061020", "Postleitzahl": "25572", "Gemarkung": "B\u00fcttel", "FlurFlurstuecknummern": "Flur3: 56/5, 37/3, 43/1, 42/2, 134/34, 155/27, 29/13, 42/4, 59, 85/58, 37/2, 32/2, 25/5, 36/3, 29/3, 62/3, 141/44, 11/16, 142/49.\r\nFlur8: 28/3, 31/5, 16/3.", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "B\u00fcttel", "Laengengrad": "9.218432", "Breitengrad": "53.913862", "Registrierungsdatum": "2020-08-26", "GeplantesInbetriebnahmedatum": "2022-08-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "B\u00fcttel Speicher", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "14574.000", "Nettonennleistung": "13200.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13200.000", "SpeMastrNummer": "SSE920345289949", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 4, "pr_url_id": "3370616", "ext_id": "SEE984446277410", "mw": 13, "status": "planning"}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-08-26T09:44:58.0831462", "to": "2022-01-27T13:56:34.4520410", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE984446277410", "DatumLetzteAktualisierung": "2022-01-27T13:56:34.4520410", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR920405658623", "Land": "84", "Bundesland": "1411", "Landkreis": "Steinburg", "Gemeinde": "B\u00fcttel", "Gemeindeschluessel": "01061020", "Postleitzahl": "25572", "Gemarkung": "B\u00fcttel", "FlurFlurstuecknummern": "Flur3: 56/5, 37/3, 43/1, 42/2, 134/34, 155/27, 29/13, 42/4, 59, 85/58, 37/2, 32/2, 25/5, 36/3, 29/3, 62/3, 141/44, 11/16, 142/49.\r\nFlur8: 28/3, 31/5, 16/3.", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "B\u00fcttel", "Laengengrad": "9.218432", "Breitengrad": "53.913862", "Registrierungsdatum": "2020-08-26", "GeplantesInbetriebnahmedatum": "2022-08-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "B\u00fcttel Speicher", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "14574.000", "Nettonennleistung": "13200.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13200.000", "SpeMastrNummer": "SSE920345289949", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3370616", "owner": "ENERPARC Solar Invest 184 GmbH", "mwh": 4, "ext_id": "SEE984446277410", "mw": 13, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31"}}, "mw": 13, "mwh_is_estimate": false, "mwh": 4, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31", "month_disappeared": "", "go_live": "0 ~ 2022-08", "go_live_year_int": 2022, "name": "B\u00fcttel Speicher", "name_short": "B\u00fcttel Speicher", "owner": "ENERPARC Solar Invest 184 GmbH", "state": "schleswig-holstein", "country": "germany", "lat": "53.913862", "long": "9.218432", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.913862+9.218432", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3370616"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "WBS-Tarzow", "city": "", "id": "534", "external_id": "SEE937857006797", "state": "mecklenburg-vorpommern", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "534", "external_id": "SEE937857006797", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "WBS-Tarzow", "external_id": "SEE937857006797", "state": "mecklenburg-vorpommern", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "KNE Windpark Nr. 12 GmbH \uff06 Co. KG", "status": "planning", "date_first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01", "month_disappeared": "", "lat": "53.813797", "long": "11.581984", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3371345"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE937857006797", "DatumLetzteAktualisierung": "2020-08-31T06:05:26.1054583", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR901241927012", "Land": "84", "Bundesland": "1407", "Landkreis": "Nordwestmecklenburg", "Gemeinde": "L\u00fcbow", "Gemeindeschluessel": "13074047", "Postleitzahl": "23972", "Strasse": "Tarzow", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "1", "Ort": "L\u00fcbow", "Laengengrad": "11.581984", "Breitengrad": "53.813797", "Registrierungsdatum": "2020-08-25", "GeplantesInbetriebnahmedatum": "2022-02-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "DatumDesBetreiberwechsels": "2020-08-31", "DatumRegistrierungDesBetreiberwechsels": "2020-08-31", "NameStromerzeugungseinheit": "WBS-Tarzow", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11000.000", "SpeMastrNummer": "SSE909091437262", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 10, "pr_url_id": "3371345", "ext_id": "SEE937857006797", "mw": 10, "status": "planning"}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-08-31T06:05:26.1054583", "to": "2022-02-15T06:25:54.4267956", "extra": "", "change_type": "misc"}, {"name": "GeplantesInbetriebnahmedatum", "from": "2022-02-01", "to": "2023-04-30", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE937857006797", "DatumLetzteAktualisierung": "2022-02-15T06:25:54.4267956", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR901241927012", "Land": "84", "Bundesland": "1407", "Landkreis": "Nordwestmecklenburg", "Gemeinde": "L\u00fcbow", "Gemeindeschluessel": "13074047", "Postleitzahl": "23972", "Strasse": "Tarzow", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "1", "Ort": "L\u00fcbow", "Laengengrad": "11.581984", "Breitengrad": "53.813797", "Registrierungsdatum": "2020-08-25", "GeplantesInbetriebnahmedatum": "2023-04-30", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "DatumDesBetreiberwechsels": "2020-08-31", "DatumRegistrierungDesBetreiberwechsels": "2020-08-31", "NameStromerzeugungseinheit": "WBS-Tarzow", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11000.000", "SpeMastrNummer": "SSE909091437262", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3371345", "owner": "KNE Windpark Nr. 12 GmbH \uff06 Co. KG", "mwh": 10, "ext_id": "SEE937857006797", "mw": 10, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01"}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01", "month_disappeared": "", "go_live": "0 ~ 2022-02", "go_live_year_int": 2022, "name": "WBS-Tarzow", "name_short": "WBS-Tarzow", "owner": "KNE Windpark Nr. 12 GmbH \uff06 Co. KG", "state": "mecklenburg-vorpommern", "country": "germany", "lat": "53.813797", "long": "11.581984", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.813797+11.581984", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3371345"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oakland", "city": "Oakland", "id": "39", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "36", "estimate_mwh": "", "power_mw": "145", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.79422", "long": "-122.20837", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "39", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 145, "mwh_is_estimate": false, "mwh": 36, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "month_disappeared": "", "go_live": "0 ~ 2022", "go_live_year_int": 2022, "name": "Oakland", "name_short": "Oakland", "owner": "", "state": "california", "country": "usa", "lat": "37.79422", "long": "-122.20837", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:37.79422+-122.20837", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Im Buckeberg 62 Stromspeicher", "city": "", "id": "537", "external_id": "SEE946919525862", "state": "baden-wuerttemberg", "country": "germany", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "537", "external_id": "SEE946919525862", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Im Buckeberg 62 Stromspeicher", "external_id": "SEE946919525862", "state": "baden-wuerttemberg", "country": "germany", "mwh": 13, "estimate_mwh": "", "power_mw": 13, "owner": "", "status": "planning", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01", "month_disappeared": "", "lat": "48.914035", "long": "8.524357", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4680516"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE946919525862", "DatumLetzteAktualisierung": "2021-10-04T16:36:44.0149153", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR937155736822", "Land": "84", "Bundesland": "1402", "Landkreis": "Karlsruhe", "Gemeinde": "Karlsbad", "Gemeindeschluessel": "08215096", "Postleitzahl": "76307", "Strasse": "Im Buckeberg", "StrasseNichtGefunden": "0", "Hausnummer": "62", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Karlsbad", "Laengengrad": "8.524357", "Breitengrad": "48.914035", "Registrierungsdatum": "2021-10-04", "GeplantesInbetriebnahmedatum": "2021-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Im Buckeberg 62 Stromspeicher", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "Einspeisungsart": "689", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE970118338879", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 13, "pr_url_id": "4680516", "ext_id": "SEE946919525862", "mw": 13, "status": "planning"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE946919525862", "DatumLetzteAktualisierung": "2021-10-04T16:36:44.0149153", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR937155736822", "Land": "84", "Bundesland": "1402", "Landkreis": "Karlsruhe", "Gemeinde": "Karlsbad", "Gemeindeschluessel": "08215096", "Postleitzahl": "76307", "Strasse": "Im Buckeberg", "StrasseNichtGefunden": "0", "Hausnummer": "62", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Karlsbad", "Laengengrad": "8.524357", "Breitengrad": "48.914035", "Registrierungsdatum": "2021-10-04", "GeplantesInbetriebnahmedatum": "2021-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Im Buckeberg 62 Stromspeicher", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "Einspeisungsart": "689", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE970118338879", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4680516", "owner": "", "mwh": 13, "ext_id": "SEE946919525862", "mw": 13, "status": "planning"}, "current_month": "2022-05", "dates": {"first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01"}}, "mw": 13, "mwh_is_estimate": false, "mwh": 13, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01", "month_disappeared": "", "go_live": "0 ~ 2021-12", "go_live_year_int": 2021, "name": "Im Buckeberg 62 Stromspeicher", "name_short": "Im Buckeberg 62 Stromspeicher", "owner": "", "state": "baden-wuerttemberg", "country": "germany", "lat": "48.914035", "long": "8.524357", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.914035+8.524357", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4680516"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Nofar Israel", "city": "", "id": "5", "external_id": "", "state": "", "country": "israel", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "Nofar Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.961747", "long": "34.835081", "coords_hint": "0", "use_case": "150mw solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy", "link2": "", "link3": "", "link4": ""}, "internal_id": "5", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Nofar Israel", "name_short": "Nofar Israel", "owner": "", "state": "", "country": "israel", "lat": "31.961747", "long": "34.835081", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.961747+34.835081", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hokkaido", "city": "", "id": "10", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.325369", "long": "142.589328", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market", "link2": "", "link3": "", "link4": ""}, "internal_id": "10", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 6, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hokkaido", "name_short": "Hokkaido", "owner": "", "state": "", "country": "japan", "lat": "43.325369", "long": "142.589328", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:43.325369+142.589328", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "switch datacenter", "city": "", "id": "18", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "", "customer": "switch", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.058908", "long": "-115.21174", "coords_hint": "0", "use_case": "datacenter", "notes": "", "project_website": "", "link1": "https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/", "link2": "", "link3": "", "link4": ""}, "internal_id": "18", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "switch datacenter", "name_short": "switch datacenter", "owner": "", "state": "nevada", "country": "usa", "lat": "36.058908", "long": "-115.21174", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.058908+-115.21174", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ozop New York", "city": "new york city / brooklyn", "id": "33", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "2", "customer": "Ozop Energy Systems", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.645624", "long": "-73.940749", "coords_hint": "0", "use_case": "peak shaving", "notes": "together with stem athena software", "project_website": "", "link1": "https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "link2": "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html", "link3": "", "link4": ""}, "internal_id": "33", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 2, "mwh_is_estimate": false, "mwh": 4, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ozop New York", "name_short": "Ozop New York", "owner": "", "state": "new york", "country": "usa", "lat": "40.645624", "long": "-73.940749", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.645624+-73.940749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["together with stem athena software"], "links": ["https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Morro Bay", "city": "Morro Bay", "id": "41", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "2400", "estimate_mwh": "", "power_mw": "600", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.374224", "long": "-120.858684", "coords_hint": "1", "use_case": "", "notes": "revitalise existing gas power plant site, start construction in 2022 should take 36-48 month to complete", "project_website": "", "link1": "https://www.energy-storage.news/vistra-proposes-california-battery-project-twice-the-size-of-worlds-largest-facility-to-date/", "link2": "http://www.morrobayca.gov/documentcenter/view/15093", "link3": "", "link4": ""}, "internal_id": "41", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 600, "mwh_is_estimate": false, "mwh": 2400, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Morro Bay", "name_short": "Morro Bay", "owner": "", "state": "california", "country": "usa", "lat": "35.374224", "long": "-120.858684", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.374224+-120.858684", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["revitalise existing gas power plant site, start construction in 2022 should take 36-48 month to complete"], "links": ["https://www.energy-storage.news/vistra-proposes-california-battery-project-twice-the-size-of-worlds-largest-facility-to-date/", "http://www.morrobayca.gov/documentcenter/view/15093"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hubei Flow Battery", "city": "Xiangyang", "id": "44", "external_id": "", "state": "hubei", "country": "china", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "100", "customer": "Hubei Pingfan Ruifeng New Energy Technology", "owner": "", "developer": "", "manufacturer": "VRB Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-05-21", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.075783", "long": "112.145275", "coords_hint": "0", "use_case": "500MW rooftop solar support", "notes": "Vanadium flow battery, built in phases", "project_website": "", "link1": "https://www.energy-storage.news/vrb-energy-breaks-ground-on-100mw-500mwh-flow-battery-and-gigafactory-in-china/", "link2": "https://vrbenergy.com/vrb-energy-announces-agreement-for-chinas-largest-solar-battery-a-100mw-solar-storage-project-in-hubei-province/", "link3": "", "link4": ""}, "internal_id": "44", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 500, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2021-05-21", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hubei Flow Battery", "name_short": "Hubei Flow Battery", "owner": "", "state": "hubei", "country": "china", "lat": "32.075783", "long": "112.145275", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.075783+112.145275", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Vanadium flow battery, built in phases"], "links": ["https://www.energy-storage.news/vrb-energy-breaks-ground-on-100mw-500mwh-flow-battery-and-gigafactory-in-china/", "https://vrbenergy.com/vrb-energy-announces-agreement-for-chinas-largest-solar-battery-a-100mw-solar-storage-project-in-hubei-province/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Spalding", "city": "spalding", "id": "58", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "170", "customer": "Intergen", "owner": "", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.805112", "long": "-0.133741", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.intergen.com/our-technologies/development-projects/spalding-energy-park/", "link1": "https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec", "link2": "", "link3": "", "link4": ""}, "internal_id": "58", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 170, "mwh_is_estimate": false, "mwh": 350, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Spalding", "name_short": "Spalding", "owner": "", "state": "", "country": "uk", "lat": "52.805112", "long": "-0.133741", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.805112+-0.133741", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Antofagasta", "city": "Atacama Desert", "id": "59", "external_id": "", "state": "", "country": "chile", "capacity_mwh": "560", "estimate_mwh": "", "power_mw": "112", "customer": "AES Gener", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Sunstack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-19", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-24.014801", "long": "-68.58494", "coords_hint": "0", "use_case": "253MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/aes-begins-work-on-560mwh-largest-battery-system-in-latin-america-for-solar-and-wind-in-chile/", "link2": "https://www.renpp.eu/en/solar-project/andes-solar-park-1018", "link3": "", "link4": ""}, "internal_id": "59", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 112, "mwh_is_estimate": false, "mwh": 560, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2020-10-19", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Antofagasta", "name_short": "Antofagasta", "owner": "", "state": "", "country": "chile", "lat": "-24.014801", "long": "-68.58494", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-24.014801+-68.58494", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/aes-begins-work-on-560mwh-largest-battery-system-in-latin-america-for-solar-and-wind-in-chile/", "https://www.renpp.eu/en/solar-project/andes-solar-park-1018"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crimson", "city": "Riverside County", "id": "72", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "1400", "estimate_mwh": "", "power_mw": "350", "customer": "Recurrent Energy / Axium Infrastructure", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.705099", "long": "-115.804279", "coords_hint": "0", "use_case": "", "notes": "construction is expected to start in q3 2021, location is 35miles northwest of substation near blythe / colorado river substation", "project_website": "https://recurrentenergy.com/project-portfolio/#", "link1": "https://www.energy-storage.news/canadian-solar-sells-majority-stake-in-1-4gwh-california-battery-energy-storage-project/", "link2": "https://www.energy-storage.news/us-doi-gives-green-light-to-350mw-1400mwh-energy-storage-project-in-california/", "link3": "", "link4": ""}, "internal_id": "72", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 350, "mwh_is_estimate": false, "mwh": 1400, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Crimson", "name_short": "Crimson", "owner": "", "state": "california", "country": "usa", "lat": "33.705099", "long": "-115.804279", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.705099+-115.804279", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["construction is expected to start in q3 2021, location is 35miles northwest of substation near blythe / colorado river substation"], "links": ["https://www.energy-storage.news/canadian-solar-sells-majority-stake-in-1-4gwh-california-battery-energy-storage-project/", "https://www.energy-storage.news/us-doi-gives-green-light-to-350mw-1400mwh-energy-storage-project-in-california/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Slate", "city": "Kings County", "id": "73", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "561", "estimate_mwh": "", "power_mw": "140", "customer": "Recurrent Energy / Goldman Sachs Renewables Power (GSRP)", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.227583", "long": "-119.877056", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/slate/", "link1": "https://www.energy-storage.news/progress-report-some-more-of-us-biggest-battery-projects-taking-shape/", "link2": "https://ceqanet.opr.ca.gov/2019069068/2", "link3": "", "link4": ""}, "internal_id": "73", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 140, "mwh_is_estimate": false, "mwh": 561, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2021-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Slate", "name_short": "Slate", "owner": "", "state": "california", "country": "usa", "lat": "36.227583", "long": "-119.877056", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.227583+-119.877056", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/progress-report-some-more-of-us-biggest-battery-projects-taking-shape/", "https://ceqanet.opr.ca.gov/2019069068/2"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coventry Energy Superhub", "city": "Coventry", "id": "81", "external_id": "", "state": "west midlands", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "100", "customer": "Pivot Power (EDF Renewables)", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.404409", "long": "-1.525063", "coords_hint": "0", "use_case": "EV charging support", "notes": "", "project_website": "https://www.pivot-power.co.uk/our-projects/#", "link1": "https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/", "link2": "", "link3": "", "link4": ""}, "internal_id": "81", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coventry Energy Superhub", "name_short": "Coventry Energy Superhub", "owner": "", "state": "west midlands", "country": "uk", "lat": "52.404409", "long": "-1.525063", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.404409+-1.525063", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bustleholmel Energy Superhub", "city": "Sandwell", "id": "82", "external_id": "", "state": "west midlands", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "100", "customer": "Pivot Power (EDF Renewables)", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.543952", "long": "-1.981982", "coords_hint": "0", "use_case": "EV charging support", "notes": "", "project_website": "https://www.pivot-power.co.uk/our-projects/#", "link1": "https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/", "link2": "", "link3": "", "link4": ""}, "internal_id": "82", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bustleholmel Energy Superhub", "name_short": "Bustleholmel Energy Superhub", "owner": "", "state": "west midlands", "country": "uk", "lat": "52.543952", "long": "-1.981982", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.543952+-1.981982", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wunsiedel", "city": "Wunsiedel", "id": "85", "external_id": "", "state": "bavaria", "country": "germany", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Siemens", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.041482", "long": "12.029522", "coords_hint": "0", "use_case": "hydrogen plant support", "notes": "2021: just a letter of intent", "project_website": "", "link1": "https://www.energy-storage.news/siemens-and-fluence-to-build-renewables-integrating-100mw-200mwh-battery-project-in-germany/", "link2": "", "link3": "", "link4": ""}, "internal_id": "85", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wunsiedel", "name_short": "Wunsiedel", "owner": "Siemens", "state": "bavaria", "country": "germany", "lat": "50.041482", "long": "12.029522", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.041482+12.029522", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2021: just a letter of intent"], "links": ["https://www.energy-storage.news/siemens-and-fluence-to-build-renewables-integrating-100mw-200mwh-battery-project-in-germany/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kemsley Energy Superhub", "city": "Kemsley", "id": "92", "external_id": "7368", "state": "kent", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Pivot Power (EDF Renewables)", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "construction start date from youtube video", "project_website": "https://www.pivot-power.co.uk/our-projects/", "link1": "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "link2": "https://www.youtube.com/watch?v=od2h3syN8P4&t=2s", "link3": "", "link4": ""}, "internal_id": "92", "external_id": "7368", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kemsley Substation", "external_id": "7368", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "construction", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.366785", "long": "0.742542", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7368", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Kemsley Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land To The South Of Kemsley S, Ypres Drive, Kemsley, Sittingbourne, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME10 2", "X-coordinate": "591008", "Y-coordinate": "166650", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "19/502514/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/07/2022", "Under Construction": "15/11/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.366785", "long": "0.742542", "status": "construction", "mw": 49, "ext_id": "7368"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "15/11/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7368", "Record Last Updated (dd/mm/yyyy)": "15/11/2019", "Operator (or Applicant)": "Pivot Power", "Site Name": "Kemsley Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South Of Kemsley S, Ypres Drive, Kemsley, Sittingbourne, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME10 2", "X-coordinate": "591008", "Y-coordinate": "166650", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "19/502514/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/07/2022", "Under Construction": "15/11/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.366785", "long": "0.742542", "status": "construction", "mw": 49, "ext_id": "7368"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kemsley Substation", "name_short": "Kemsley Substation", "owner": "Pivot Power", "state": "south east", "country": "uk", "lat": "51.366785", "long": "0.742542", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.366785+0.742542", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["construction start date from youtube video"], "links": ["https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "https://www.youtube.com/watch?v=od2h3syN8P4&t=2s"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ringo-Bellac", "city": "Bellac", "id": "95", "external_id": "", "state": "haute-vienne", "country": "france", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "10", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Saft", "type": "", "cells": "Tianneng", "no_of_battery_units": "12", "status": "construction", "date_first_heard": "", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.104588", "long": "1.04347", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "2021: experiment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-renouvelable-lexperimentation-ringo-bellac-haute-vienne", "link3": "", "link4": ""}, "internal_id": "95", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ringo-Bellac", "name_short": "Ringo-Bellac", "owner": "", "state": "haute-vienne", "country": "france", "lat": "46.104588", "long": "1.04347", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.104588+1.04347", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 12, "notes_split": ["2021: experiment which lasts for 3 years"], "links": ["https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-renouvelable-lexperimentation-ringo-bellac-haute-vienne"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ringo-Ventavon", "city": "Ventavon", "id": "96", "external_id": "", "state": "", "country": "france", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "10", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Blue Solutions", "type": "Blue LMP", "cells": "Bollore LMP", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "44.344414", "long": "5.915866", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "2021: experiment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-lexperimentation-ringo-ventavon", "link3": "https://www.engie-solutions.com/en/news/renewable-energy-storage", "link4": ""}, "internal_id": "96", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2020-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ringo-Ventavon", "name_short": "Ringo-Ventavon", "owner": "", "state": "", "country": "france", "lat": "44.344414", "long": "5.915866", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.344414+5.915866", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2021: experiment which lasts for 3 years"], "links": ["https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-lexperimentation-ringo-ventavon", "https://www.engie-solutions.com/en/news/renewable-energy-storage"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Intrepid", "city": "Oceanside", "id": "127", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "300", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.616803", "long": "-73.646401", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, "internal_id": "127", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 300, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Intrepid", "name_short": "Intrepid", "owner": "Hecate Energy", "state": "new york", "country": "usa", "lat": "40.616803", "long": "-73.646401", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.616803+-73.646401", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Loy Yang", "city": "", "id": "135", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "AGL Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.254578", "long": "146.581076", "coords_hint": "0", "use_case": "at coal power plant", "notes": "", "project_website": "", "link1": "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-loy-yang-s-proposed-battery-receives-planning-approval", "link2": "", "link3": "", "link4": ""}, "internal_id": "135", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Loy Yang", "name_short": "Loy Yang", "owner": "AGL Energy Limited", "state": "victoria", "country": "australia", "lat": "-38.254578", "long": "146.581076", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-38.254578+146.581076", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-loy-yang-s-proposed-battery-receives-planning-approval"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Liddell", "city": "", "id": "136", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "AGL Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-32.371786", "long": "150.972683", "coords_hint": "0", "use_case": "at coal power plant", "notes": "could not find mwh info", "project_website": "", "link1": "https://www.pv-magazine-australia.com/2021/05/07/agl-pushes-ahead-with-renewable-energy-plans-for-liddell-site/", "link2": "", "link3": "", "link4": ""}, "internal_id": "136", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-05-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Liddell", "name_short": "Liddell", "owner": "AGL Energy Limited", "state": "new south wales", "country": "australia", "lat": "-32.371786", "long": "150.972683", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-32.371786+150.972683", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["could not find mwh info"], "links": ["https://www.pv-magazine-australia.com/2021/05/07/agl-pushes-ahead-with-renewable-energy-plans-for-liddell-site/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Omburu", "city": "erongo region", "id": "256", "external_id": "", "state": "", "country": "namibia", "capacity_mwh": "72", "estimate_mwh": "", "power_mw": "58", "customer": "", "owner": "NamPower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-21.495675", "long": "16.026467", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/e20m-grant-funding-for-namibias-first-grid-scale-bess-from-germanys-national-development-bank/", "link2": "", "link3": "", "link4": ""}, "internal_id": "256", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 58, "mwh_is_estimate": false, "mwh": 72, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Omburu", "name_short": "Omburu", "owner": "NamPower", "state": "", "country": "namibia", "lat": "-21.495675", "long": "16.026467", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-21.495675+16.026467", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/e20m-grant-funding-for-namibias-first-grid-scale-bess-from-germanys-national-development-bank/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chelveston Renewable Energy Park", "city": "", "id": "273", "external_id": "6941", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Federal Estates", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-06-15", "start_construction": "2019-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "273", "external_id": "6941", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chelveston Renewable Energy Park", "external_id": "6941", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Federal Estates", "status": "construction", "date_first_heard": "2017-06-15", "start_construction": "2019-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.310725", "long": "-0.530869", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6941", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Federal Estates", "Site Name": "Chelveston Renewable Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,\ufffdNorthamptonshire", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN9 6AR", "X-coordinate": "500254", "Y-coordinate": "269084", "Planning Authority": "East Northamptonshire Council", "Planning Application Reference": "17/00784/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2019", "Operational": "", "Heat Network Ref": "", "lat": "52.310725", "long": "-0.530869", "status": "construction", "mw": 20, "ext_id": "6941"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,\ufffdNorthamptonshire", "to": "Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,\ufffd", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/05/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6941", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Federal Estates", "Site Name": "Chelveston Renewable Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,\ufffd", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN9 6AR", "X-coordinate": "500254", "Y-coordinate": "269084", "Planning Authority": "East Northamptonshire Council", "Planning Application Reference": "17/00784/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2019", "Operational": "", "Heat Network Ref": "", "lat": "52.310725", "long": "-0.530869", "status": "construction", "mw": 20, "ext_id": "6941"}, "current_month": "2024-01", "dates": {"first_heard": "2020-05-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-06-15", "start_construction": "2019-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chelveston Renewable Energy Park", "name_short": "Chelveston Renewable Energy Park", "owner": "Federal Estates", "state": "east midlands", "country": "uk", "lat": "52.310725", "long": "-0.530869", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.310725+-0.530869", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Breach Farm - Energy Barn", "city": "", "id": "275", "external_id": "6914", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "275", "external_id": "6914", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Breach Farm - Energy Barn", "external_id": "6914", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Bluefield Solar Income Fund", "status": "planning", "date_first_heard": "2017-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.766651", "long": "-1.609775", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6914", "Record Last Updated (dd/mm/yyyy)": "25/08/2020", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Breach Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Breach Farm, Caldwell, Swadlincote, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE12 6RJ", "X-coordinate": "426427", "Y-coordinate": "318855", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "9/2017/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/08/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.766651", "long": "-1.609775", "status": "planning", "mw": 40, "ext_id": "6914"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/08/2020", "to": "27/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Anesco/ Green Hedge Energy UK", "to": "Bluefield Solar Income Fund", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Breach Farm, Caldwell, Swadlincote, Derbyshire", "to": "Breach Farm, Caldwell, Swadlincote, ", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/08/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Planning Permission Expired", "from": "15/08/2020", "to": "01/05/2021", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6914", "Record Last Updated (dd/mm/yyyy)": "27/05/2022", "Operator (or Applicant)": "Bluefield Solar Income Fund", "Site Name": "Breach Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6962", "Address": "Breach Farm, Caldwell, Swadlincote, ", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE12 6RJ", "X-coordinate": "426427", "Y-coordinate": "318855", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "9/2017/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/08/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/05/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.766651", "long": "-1.609775", "status": "planning", "mw": 40, "ext_id": "6914"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2017-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Breach Farm - Energy Barn", "name_short": "Breach Farm - Energy Barn", "owner": "Bluefield Solar Income Fund", "state": "east midlands", "country": "uk", "lat": "52.766651", "long": "-1.609775", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.766651+-1.609775", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Traston Road", "city": "", "id": "277", "external_id": "6929", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "277", "external_id": "6929", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Traston Road", "external_id": "6929", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Field Energy", "status": "planning", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.568102", "long": "-2.966702", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6929", "Record Last Updated (dd/mm/yyyy)": "28/04/2020", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Traston Road", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land East Of Clarke Energy Production, Traston Road, Newport", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP19 4PW", "X-coordinate": "333094", "Y-coordinate": "185913", "Planning Authority": "Newport City Council", "Planning Application Reference": "16/0855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/11/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.568102", "long": "-2.966702", "status": "planning", "mw": 20, "ext_id": "6929"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/04/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "08/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "UK Power Reserve", "to": "Field Energy", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "03/11/2021", "to": "27/07/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6929", "Record Last Updated (dd/mm/yyyy)": "08/09/2023", "Operator (or Applicant)": "Field Energy", "Site Name": "Traston Road", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land East Of Clarke Energy Production, Traston Road, Newport", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP19 4PW", "X-coordinate": "333094", "Y-coordinate": "185913", "Planning Authority": "Newport City Council", "Planning Application Reference": "16/0855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/07/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.568102", "long": "-2.966702", "status": "planning", "mw": 20, "ext_id": "6929"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Traston Road", "name_short": "Traston Road", "owner": "Field Energy", "state": "wales", "country": "uk", "lat": "51.568102", "long": "-2.966702", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.568102+-2.966702", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Slamseys Energy Storage", "city": "", "id": "288", "external_id": "7000", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Gridserve Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-10-26", "start_construction": "2020-01-13", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "288", "external_id": "7000", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Slamseys Energy Storage", "external_id": "7000", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Gridserve Energy Storage", "status": "construction", "date_first_heard": "2017-10-26", "start_construction": "2020-01-13", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.850774", "long": "0.523461", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7000", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Gridserve Energy Storage", "Site Name": "Slamseys Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land North Of Slamseys Farm, Blackley Lane, Great Notley, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM77 7QW", "X-coordinate": "573901", "Y-coordinate": "219919", "Planning Authority": "Braintree District Council", "Planning Application Reference": "17/01235/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "13/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "51.850774", "long": "0.523461", "status": "construction", "mw": 10, "ext_id": "7000"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/01/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7000", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Gridserve Energy Storage", "Site Name": "Slamseys Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North Of Slamseys Farm, Blackley Lane, Great Notley, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM77 7QW", "X-coordinate": "573901", "Y-coordinate": "219919", "Planning Authority": "Braintree District Council", "Planning Application Reference": "17/01235/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "13/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "51.850774", "long": "0.523461", "status": "construction", "mw": 10, "ext_id": "7000"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-10-26", "start_construction": "2020-01-13", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Slamseys Energy Storage", "name_short": "Slamseys", "owner": "Gridserve Energy Storage", "state": "eastern", "country": "uk", "lat": "51.850774", "long": "0.523461", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.850774+0.523461", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Norwich Road Industrial Estate", "city": "", "id": "290", "external_id": "6958", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "290", "external_id": "6958", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Norwich Road Industrial Estate", "external_id": "6958", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "RNA Energy", "status": "planning", "date_first_heard": "2017-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.356262", "long": "1.508561", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6958", "Record Last Updated (dd/mm/yyyy)": "07/04/2021", "Operator (or Applicant)": "RNA Energy", "Site Name": "Norwich Road Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth Suffolk", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 8QJ", "X-coordinate": "639014", "Y-coordinate": "278928", "Planning Authority": "Suffolk Coastal District Council", "Planning Application Reference": "DC/17/0161/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/01/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.356262", "long": "1.508561", "status": "planning", "mw": 40, "ext_id": "6958"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth Suffolk", "to": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth ", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/04/2021", "to": "04/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12529", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "04/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6958", "Record Last Updated (dd/mm/yyyy)": "04/11/2022", "Operator (or Applicant)": "RNA Energy", "Site Name": "Norwich Road Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12529", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 8QJ", "X-coordinate": "639014", "Y-coordinate": "278928", "Planning Authority": "Suffolk Coastal District Council", "Planning Application Reference": "DC/17/0161/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/01/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.356262", "long": "1.508561", "status": "planning", "mw": 40, "ext_id": "6958"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2017-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Norwich Road Industrial Estate", "name_short": "Norwich Road Industrial Estate", "owner": "RNA Energy", "state": "eastern", "country": "uk", "lat": "52.356262", "long": "1.508561", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.356262+1.508561", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land off Queenborough Road", "city": "", "id": "291", "external_id": "7003", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-10-30", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "291", "external_id": "7003", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land off Queenborough Road", "external_id": "7003", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "UK Power Reserve", "status": "construction", "date_first_heard": "2018-10-30", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.408738", "long": "0.767948", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7003", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Land off Queenborough Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Adjacent To 9 Neatscourt Cottages, Queenborough Road, Halfway, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME12 3RJ", "X-coordinate": "592600", "Y-coordinate": "171381", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "17/503032/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/06/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/10/2021", "Under Construction": "01/12/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.408738", "long": "0.767948", "status": "construction", "mw": 40, "ext_id": "7003"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/01/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7003", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Land off Queenborough Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent To 9 Neatscourt Cottages, Queenborough Road, Halfway, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME12 3RJ", "X-coordinate": "592600", "Y-coordinate": "171381", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "17/503032/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/06/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/10/2021", "Under Construction": "01/12/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.408738", "long": "0.767948", "status": "construction", "mw": 40, "ext_id": "7003"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-10-30", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Land off Queenborough Road", "name_short": "Land off Queenborough Road", "owner": "UK Power Reserve", "state": "south east", "country": "uk", "lat": "51.408738", "long": "0.767948", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.408738+0.767948", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bilbo Solar Farm Energy Storage ", "city": "", "id": "296", "external_id": "7020", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Energy International", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-09-20", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "296", "external_id": "7020", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bilbo Solar Farm Energy Storage ", "external_id": "7020", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Green Energy International", "status": "construction", "date_first_heard": "2019-09-20", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.589434", "long": "-1.912557", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7020", "Record Last Updated (dd/mm/yyyy)": "30/07/2020", "Operator (or Applicant)": "Green Energy International", "Site Name": "Bilbo Solar Farm Energy Storage ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6736", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian", "County": "Aberdeen", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QJ", "X-coordinate": "405327", "Y-coordinate": "855492", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2019/0296", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/12/2020", "Operational": "", "Heat Network Ref": "", "lat": "57.589434", "long": "-1.912557", "status": "construction", "mw": 40, "ext_id": "7020"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/07/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Aberdeen", "to": "Aberdeenshire", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "30/07/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7020", "Record Last Updated (dd/mm/yyyy)": "30/07/2020", "Operator (or Applicant)": "Green Energy International", "Site Name": "Bilbo Solar Farm Energy Storage ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6736", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QJ", "X-coordinate": "405327", "Y-coordinate": "855492", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2019/0296", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/12/2020", "Operational": "", "Heat Network Ref": "", "lat": "57.589434", "long": "-1.912557", "status": "construction", "mw": 40, "ext_id": "7020"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-09-20", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bilbo Solar Farm Energy Storage ", "name_short": "Bilbo Solar Farm Energy Storage ", "owner": "Green Energy International", "state": "scotland", "country": "uk", "lat": "57.589434", "long": "-1.912557", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.589434+-1.912557", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stony Energy Storage Facility", "city": "", "id": "297", "external_id": "7001", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "297", "external_id": "7001", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stony Energy Storage Facility", "external_id": "7001", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 79, "power_mw": 79, "owner": "Gore Street Energy Storage Fund", "status": "construction", "date_first_heard": "2017-10-12", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.018193", "long": "-0.868566", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7001", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Stony Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land to the south west of Stony Stratford Substation, south of Stratford Road, Milton Keynes", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "MK19 6DZ", "X-coordinate": "477740", "Y-coordinate": "236134", "Planning Authority": "Aylesbury Vale District Council", "Planning Application Reference": "17/02259/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.018193", "long": "-0.868566", "status": "planning", "mw": 49, "ext_id": "7001"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2020", "to": "18/03/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Renewable Energy Systems (RES)", "to": "Gore Street Energy Storage Fund", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "49.90", "to": "79.90", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 49, "to": 79, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "12/10/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/03/2022", "to": "30/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "30/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7001", "Record Last Updated (dd/mm/yyyy)": "30/11/2022", "Operator (or Applicant)": "Gore Street Energy Storage Fund", "Site Name": "Stony Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "79.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south west of Stony Stratford Substation, south of Stratford Road, Milton Keynes", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "MK19 6DZ", "X-coordinate": "477740", "Y-coordinate": "236134", "Planning Authority": "Aylesbury Vale District Council", "Planning Application Reference": "17/02259/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/10/2020", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "52.018193", "long": "-0.868566", "status": "construction", "mw": 79, "ext_id": "7001"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-25", "start_construction": "2022-11-30", "start_operation": ""}, "month_disappeared": ""}, "mw": 79, "mwh_is_estimate": true, "mwh": 79, "mwh_estimate": 79, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-10-12", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stony Energy Storage Facility", "name_short": "Stony Energy", "owner": "Gore Street Energy Storage Fund", "state": "south east", "country": "uk", "lat": "52.018193", "long": "-0.868566", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.018193+-0.868566", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ravensroost Farm", "city": "", "id": "302", "external_id": "7014", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Arlington Energy (formerly Enso Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-10-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "302", "external_id": "7014", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ravensroost Farm, Minety - Battery Energy Storage", "external_id": "7014", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Conrad Energy Developments II Limited", "status": "planning", "date_first_heard": "2020-02-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.594997", "long": "-1.957914", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7014", "Record Last Updated (dd/mm/yyyy)": "12/02/2020", "Operator (or Applicant)": "Arlington Energy (formerly Enso Energy)", "Site Name": "Ravensroost Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land Adjacent Ravensroost Farm, Minety, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RJ", "X-coordinate": "403012", "Y-coordinate": "188462", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "18/04914/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.594997", "long": "-1.957914", "status": "planning", "mw": 49, "ext_id": "7014"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/02/2020", "to": "29/06/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Arlington Energy (formerly Enso Energy)", "to": "Conrad Energy Developments II Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Ravensroost Farm", "to": "Ravensroost Farm, Minety - Battery Energy Storage", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Planning Application Submitted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Application Submitted", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Adjacent Ravensroost Farm, Minety, Malmesbury, Wiltshire", "to": "Ravensroost Farm, Minety, Malmesbury, ", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "18/04914/FUL", "to": "PL/2022/04524", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "15/06/2018", "to": "13/06/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "10/10/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/06/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "29/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7014", "Record Last Updated (dd/mm/yyyy)": "29/06/2022", "Operator (or Applicant)": "Conrad Energy Developments II Limited", "Site Name": "Ravensroost Farm, Minety - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ravensroost Farm, Minety, Malmesbury, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RJ", "X-coordinate": "403012", "Y-coordinate": "188462", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/04524", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.594997", "long": "-1.957914", "status": "planning", "mw": 49, "ext_id": "7014"}, "current_month": "2024-01", "dates": {"first_heard": "2020-02-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-02-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ravensroost Farm, Minety - Battery Energy Storage", "name_short": "Ravensroost Farm, Minety", "owner": "Conrad Energy Developments II Limited", "state": "south west", "country": "uk", "lat": "51.594997", "long": "-1.957914", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.594997+-1.957914", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drax Re-Power", "city": "", "id": "303", "external_id": "7017", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Drax Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "303", "external_id": "7017", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drax Re-Power", "external_id": "7017", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Drax Group", "status": "planning", "date_first_heard": "2019-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.732262", "long": "-0.995254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7017", "Record Last Updated (dd/mm/yyyy)": "02/01/2020", "Operator (or Applicant)": "Drax Group", "Site Name": "Drax Re-Power", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "New Road, Drax, Selby, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PH", "X-coordinate": "466381", "Y-coordinate": "426676", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.732262", "long": "-0.995254", "status": "planning", "mw": 200, "ext_id": "7017"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/01/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "02/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7017", "Record Last Updated (dd/mm/yyyy)": "02/01/2020", "Operator (or Applicant)": "Drax Group", "Site Name": "Drax Re-Power", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "New Road, Drax, Selby, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PH", "X-coordinate": "466381", "Y-coordinate": "426676", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.732262", "long": "-0.995254", "status": "planning", "mw": 200, "ext_id": "7017"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2019-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drax Re-Power", "name_short": "Drax Re", "owner": "Drax Group", "state": "yorkshire and humber", "country": "uk", "lat": "53.732262", "long": "-0.995254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.732262+-0.995254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "STOR Field 9", "city": "", "id": "304", "external_id": "7018", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "37", "power_mw": "37", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "304", "external_id": "7018", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "STOR Field 9", "external_id": "7018", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 37, "power_mw": 37, "owner": "Capbal", "status": "planning", "date_first_heard": "2018-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.038888", "long": "-3.394798", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7018", "Record Last Updated (dd/mm/yyyy)": "24/07/2020", "Operator (or Applicant)": "Capbal", "Site Name": "STOR Field 9", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "37.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land East of North Road, Inverkeithing, Dunfermline, Fife", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY11 1HT", "X-coordinate": "313196", "Y-coordinate": "683767", "Planning Authority": "Fife Council", "Planning Application Reference": "18/01583/PPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/12/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/12/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.038888", "long": "-3.394798", "status": "planning", "mw": 37, "ext_id": "7018"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/07/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "06/12/2021", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/04/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7018", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Capbal", "Site Name": "STOR Field 9", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "37", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land East of North Road, Inverkeithing, Dunfermline, Fife", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY11 1HT", "X-coordinate": "313196", "Y-coordinate": "683767", "Planning Authority": "Fife Council", "Planning Application Reference": "18/01583/PPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/12/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.038888", "long": "-3.394798", "status": "planning", "mw": 37, "ext_id": "7018"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 37, "mwh_is_estimate": true, "mwh": 37, "mwh_estimate": 37, "status": "planning", "status_class": "", "date_first_heard": "2018-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "STOR Field 9", "name_short": "STOR Field 9", "owner": "Capbal", "state": "scotland", "country": "uk", "lat": "56.038888", "long": "-3.394798", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.038888+-3.394798", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Norwich Substation Storage Facility", "city": "", "id": "306", "external_id": "7021", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "306", "external_id": "7021", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Norwich Substation Storage Facility", "external_id": "7021", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2018-11-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.57348", "long": "1.275689", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7021", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Norwich Substation Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Norwich Main Substation, Mangreen Hall Lane, Dunston, Norwich, Norfolk", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8PG", "X-coordinate": "622065", "Y-coordinate": "302336", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2018/2017", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/11/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/11/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.57348", "long": "1.275689", "status": "planning", "mw": 49, "ext_id": "7021"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7021", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Norwich Substation Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Norwich Main Substation, Mangreen Hall Lane, Dunston, Norwich, Norfolk", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8PG", "X-coordinate": "622065", "Y-coordinate": "302336", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2018/2017", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/11/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/11/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.57348", "long": "1.275689", "status": "planning", "mw": 49, "ext_id": "7021"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2018-11-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Norwich Substation Storage Facility", "name_short": "Norwich Substation", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "52.57348", "long": "1.275689", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.57348+1.275689", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Enderby Storage, Redcomb Farm", "city": "", "id": "309", "external_id": "7044", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy / Enderby Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-20", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "309", "external_id": "7044", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Enderby Storage, Redcomb Farm", "external_id": "7044", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy / Enderby Storage", "status": "construction", "date_first_heard": "2017-12-20", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.597459", "long": "-1.223231", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7044", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy / Enderby Storage", "Site Name": "Enderby Storage, Redcomb Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Opposite Redcomb Farm, Desford Road, Lubbesthorpe, Leicester, Leicestershire", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE19 4AD", "X-coordinate": "452711", "Y-coordinate": "300246", "Planning Authority": "Blaby District Council", "Planning Application Reference": "17/1223/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2021", "Operational": "", "Heat Network Ref": "", "lat": "52.597459", "long": "-1.223231", "status": "construction", "mw": 49, "ext_id": "7044"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/04/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7044", "Record Last Updated (dd/mm/yyyy)": "01/04/2021", "Operator (or Applicant)": "Statera Energy / Enderby Storage", "Site Name": "Enderby Storage, Redcomb Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Opposite Redcomb Farm, Desford Road, Lubbesthorpe, Leicester, Leicestershire", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE19 4AD", "X-coordinate": "452711", "Y-coordinate": "300246", "Planning Authority": "Blaby District Council", "Planning Application Reference": "17/1223/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2021", "Operational": "", "Heat Network Ref": "", "lat": "52.597459", "long": "-1.223231", "status": "construction", "mw": 49, "ext_id": "7044"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-12-20", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Enderby Storage, Redcomb Farm", "name_short": "Enderby Storage, Redcomb Farm", "owner": "Statera Energy / Enderby Storage", "state": "east midlands", "country": "uk", "lat": "52.597459", "long": "-1.223231", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.597459+-1.223231", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middleton Clean Energy Plant", "city": "", "id": "310", "external_id": "7029", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Lancaster Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "310", "external_id": "7029", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Middleton Clean Energy Plant", "external_id": "7029", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Infra Balance New Energy", "status": "planning", "date_first_heard": "2020-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.040905", "long": "-2.895509", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7029", "Record Last Updated (dd/mm/yyyy)": "04/06/2020", "Operator (or Applicant)": "Lancaster Power", "Site Name": "Middleton Clean Energy Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe, Lancashire, LA3 2", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA32", "X-coordinate": "341454", "Y-coordinate": "460919", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "18/01203/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/01/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.040905", "long": "-2.895509", "status": "planning", "mw": 49, "ext_id": "7029"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/06/2020", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe, Lancashire, LA3 2", "to": "Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2022", "to": "26/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/09/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "26/09/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Lancaster Power", "to": "Infra Balance New Energy", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7029", "Record Last Updated (dd/mm/yyyy)": "26/09/2022", "Operator (or Applicant)": "Infra Balance New Energy", "Site Name": "Middleton Clean Energy Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA32", "X-coordinate": "341454", "Y-coordinate": "460919", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "18/01203/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/01/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.040905", "long": "-2.895509", "status": "planning", "mw": 49, "ext_id": "7029"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Middleton Clean Energy Plant", "name_short": "Middleton Clean Energy Plant", "owner": "Infra Balance New Energy", "state": "north west", "country": "uk", "lat": "54.040905", "long": "-2.895509", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.040905+-2.895509", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Portadown Road", "city": "", "id": "311", "external_id": "7047", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon Storage Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-09-21", "start_construction": "2020-01-15", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "311", "external_id": "7047", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Portadown Road", "external_id": "7047", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Low Carbon Storage Ireland", "status": "construction", "date_first_heard": "2018-09-21", "start_construction": "2020-01-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.370189", "long": "-6.42882", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7047", "Record Last Updated (dd/mm/yyyy)": "23/06/2020", "Operator (or Applicant)": "Low Carbon Storage Ireland", "Site Name": "Portadown Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land @ & 100m S/E of, 87 Portadown Road, Immediately adjacent to NIE, Craigavon, Co Armagh", "County": "Co. Armagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT62 2BB", "X-coordinate": "112456", "Y-coordinate": "506231", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA08/2018/0851/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/09/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/09/2023", "Under Construction": "15/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "54.370189", "long": "-6.42882", "status": "construction", "mw": 50, "ext_id": "7047"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/06/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7047", "Record Last Updated (dd/mm/yyyy)": "23/06/2020", "Operator (or Applicant)": "Low Carbon Storage Ireland", "Site Name": "Portadown Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land @ & 100m S/E of, 87 Portadown Road, Immediately adjacent to NIE, Craigavon, Co Armagh", "County": "Co. Armagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT62 2BB", "X-coordinate": "112456", "Y-coordinate": "506231", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA08/2018/0851/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/09/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/09/2023", "Under Construction": "15/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "54.370189", "long": "-6.42882", "status": "construction", "mw": 50, "ext_id": "7047"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-09-21", "start_construction": "2020-01-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Portadown Road", "name_short": "Portadown Road", "owner": "Low Carbon Storage Ireland", "state": "northern ireland", "country": "uk", "lat": "54.370189", "long": "-6.42882", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.370189+-6.42882", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dungannon Energy Storage System", "city": "", "id": "312", "external_id": "7050", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon Storage Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-10-08", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "312", "external_id": "7050", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dungannon Energy Storage System", "external_id": "7050", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Low Carbon Storage Ireland", "status": "construction", "date_first_heard": "2018-10-08", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.512548", "long": "-6.675125", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7050", "Record Last Updated (dd/mm/yyyy)": "03/03/2020", "Operator (or Applicant)": "Low Carbon Storage Ireland", "Site Name": "Dungannon Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "77a Ballynakilly Road, Dungannon, Co Tyrone", "County": "Co. Tyrone", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT71 6HG", "X-coordinate": "97523", "Y-coordinate": "523089", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA09/2018/0803/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/10/2023", "Under Construction": "01/12/2019", "Operational": "", "Heat Network Ref": "", "lat": "54.512548", "long": "-6.675125", "status": "construction", "mw": 50, "ext_id": "7050"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/03/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/03/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7050", "Record Last Updated (dd/mm/yyyy)": "03/03/2020", "Operator (or Applicant)": "Low Carbon Storage Ireland", "Site Name": "Dungannon Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "77a Ballynakilly Road, Dungannon, Co Tyrone", "County": "Co. Tyrone", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT71 6HG", "X-coordinate": "97523", "Y-coordinate": "523089", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA09/2018/0803/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/10/2023", "Under Construction": "01/12/2019", "Operational": "", "Heat Network Ref": "", "lat": "54.512548", "long": "-6.675125", "status": "construction", "mw": 50, "ext_id": "7050"}, "current_month": "2024-01", "dates": {"first_heard": "2020-03-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-10-08", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dungannon Energy Storage System", "name_short": "Dungannon", "owner": "Low Carbon Storage Ireland", "state": "northern ireland", "country": "uk", "lat": "54.512548", "long": "-6.675125", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.512548+-6.675125", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Riverside Energy Park", "city": "", "id": "315", "external_id": "7036", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Cory Riverside Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "315", "external_id": "7036", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Riverside Energy Park", "external_id": "7036", "state": "london", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Cory Riverside Energy", "status": "planning", "date_first_heard": "2020-04-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.504508", "long": "0.153302", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7036", "Record Last Updated (dd/mm/yyyy)": "24/06/2020", "Operator (or Applicant)": "Cory Riverside Energy", "Site Name": "Riverside Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6535", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Norman Road, Bexley, London", "County": "London", "Region": "London", "Country": "England", "Post Code": "DA17 6JY", "X-coordinate": "549545", "Y-coordinate": "180595", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010093", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.504508", "long": "0.153302", "status": "planning", "mw": 20, "ext_id": "7036"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/06/2020", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "09/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/04/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7036", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Cory Riverside Energy", "Site Name": "Riverside Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6535", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Norman Road, Bexley, London", "County": "London", "Region": "London", "Country": "England", "Post Code": "DA17 6JY", "X-coordinate": "549545", "Y-coordinate": "180595", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010093", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.504508", "long": "0.153302", "status": "planning", "mw": 20, "ext_id": "7036"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2020-04-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Riverside Energy Park", "name_short": "Riverside Energy Park", "owner": "Cory Riverside Energy", "state": "london", "country": "uk", "lat": "51.504508", "long": "0.153302", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.504508+0.153302", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ellbridge Lane", "city": "", "id": "320", "external_id": "7051", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-08-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "320", "external_id": "7051", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ellbridge Lane", "external_id": "7051", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2019-08-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.447201", "long": "-4.249874", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7051", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Ellbridge Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sub Station, Ellbridge Lane, Hatt, Saltash, Cornwall", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6PU", "X-coordinate": "240358", "Y-coordinate": "63237", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA19/03935", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/08/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/08/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447201", "long": "-4.249874", "status": "planning", "mw": 49, "ext_id": "7051"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "23/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12697", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7051", "Record Last Updated (dd/mm/yyyy)": "23/11/2022", "Operator (or Applicant)": "Pivot Power", "Site Name": "Ellbridge Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12697", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sub Station, Ellbridge Lane, Hatt, Saltash, Cornwall", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6PU", "X-coordinate": "240358", "Y-coordinate": "63237", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA19/03935", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/08/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/08/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447201", "long": "-4.249874", "status": "planning", "mw": 49, "ext_id": "7051"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-08-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ellbridge Lane", "name_short": "Ellbridge Lane", "owner": "Pivot Power", "state": "south west", "country": "uk", "lat": "50.447201", "long": "-4.249874", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.447201+-4.249874", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elland Storage Project", "city": "", "id": "321", "external_id": "7053", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "321", "external_id": "7053", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Elland Storage Project", "external_id": "7053", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "planning", "date_first_heard": "2018-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7053", "Record Last Updated (dd/mm/yyyy)": "14/11/2019", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Elland Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "18/00478/192", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/04/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "7053"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "10236", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/11/2019", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/11/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7053", "Record Last Updated (dd/mm/yyyy)": "14/11/2019", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Elland Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10236", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "18/00478/192", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/04/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "7053"}, "current_month": "2024-01", "dates": {"first_heard": "2019-11-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2018-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Elland Storage Project", "name_short": "Elland Storage", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.692652+-1.82446", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Perseverance Road", "city": "", "id": "325", "external_id": "7061", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "325", "external_id": "7061", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Perseverance Road", "external_id": "7061", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Noriker Power", "status": "planning", "date_first_heard": "2018-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.068196", "long": "-2.719292", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7061", "Record Last Updated (dd/mm/yyyy)": "31/01/2020", "Operator (or Applicant)": "Noriker Power", "Site Name": "Perseverance Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Perseverance Road, Perseverance Road, Hereford, Hereford & Worcester", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR4 9SN", "X-coordinate": "350791", "Y-coordinate": "241336", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P181659/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/12/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/12/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.068196", "long": "-2.719292", "status": "planning", "mw": 20, "ext_id": "7061"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2020", "to": "29/11/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/11/2021", "to": "24/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land At Perseverance Road, Perseverance Road, Hereford, Hereford & Worcester", "to": "Land At Perseverance Road, Perseverance Road, Hereford, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "24/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7061", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Noriker Power", "Site Name": "Perseverance Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7966", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Perseverance Road, Perseverance Road, Hereford, ", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR4 9SN", "X-coordinate": "350791", "Y-coordinate": "241336", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P181659/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/12/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/12/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.068196", "long": "-2.719292", "status": "planning", "mw": 20, "ext_id": "7061"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2018-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Perseverance Road", "name_short": "Perseverance Road", "owner": "Noriker Power", "state": "west midlands", "country": "uk", "lat": "52.068196", "long": "-2.719292", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.068196+-2.719292", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cottam Power Station", "city": "", "id": "326", "external_id": "7066", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "326", "external_id": "7066", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cottam Power Station", "external_id": "7066", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "EDF Energy", "status": "planning", "date_first_heard": "2018-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.299901", "long": "-0.779313", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7066", "Record Last Updated (dd/mm/yyyy)": "12/08/2020", "Operator (or Applicant)": "EDF Energy", "Site Name": "Cottam Power Station", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Cottam Power Station, Cottam, Retford, Nottinghamshire", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 0EU", "X-coordinate": "481450", "Y-coordinate": "378800", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "18/00249/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/02/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.299901", "long": "-0.779313", "status": "planning", "mw": 49, "ext_id": "7066"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/08/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/08/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7066", "Record Last Updated (dd/mm/yyyy)": "12/08/2020", "Operator (or Applicant)": "EDF Energy", "Site Name": "Cottam Power Station", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cottam Power Station, Cottam, Retford, Nottinghamshire", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 0EU", "X-coordinate": "481450", "Y-coordinate": "378800", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "18/00249/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/02/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.299901", "long": "-0.779313", "status": "planning", "mw": 49, "ext_id": "7066"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2018-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cottam Power Station", "name_short": "Cottam Power Station", "owner": "EDF Energy", "state": "east midlands", "country": "uk", "lat": "53.299901", "long": "-0.779313", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.299901+-0.779313", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gloucestershire Science and Technology Park", "city": "", "id": "327", "external_id": "7067", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "327", "external_id": "7067", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gloucestershire Science and Technology Park", "external_id": "7067", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Ecotricity", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.689953", "long": "-2.498942", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7067", "Record Last Updated (dd/mm/yyyy)": "14/03/2022", "Operator (or Applicant)": "Ecotricity", "Site Name": "Gloucestershire Science and Technology Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10796", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hamfield Lane, Berkeley, ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL13 9FB", "X-coordinate": "365607", "Y-coordinate": "199140", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.18/0019/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/01/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/04/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.689953", "long": "-2.498942", "status": "planning", "mw": 30, "ext_id": "7067"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7067", "Record Last Updated (dd/mm/yyyy)": "14/03/2022", "Operator (or Applicant)": "Ecotricity", "Site Name": "Gloucestershire Science and Technology Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10796", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hamfield Lane, Berkeley, ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL13 9FB", "X-coordinate": "365607", "Y-coordinate": "199140", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.18/0019/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/01/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/04/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.689953", "long": "-2.498942", "status": "planning", "mw": 30, "ext_id": "7067"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Gloucestershire Science and Technology Park", "name_short": "Gloucestershire Science and Technol...", "owner": "Ecotricity", "state": "south west", "country": "uk", "lat": "51.689953", "long": "-2.498942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.689953+-2.498942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sundridge Hill", "city": "", "id": "331", "external_id": "7081", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "331", "external_id": "7081", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sundridge Hill", "external_id": "7081", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RNA Energy", "status": "construction", "date_first_heard": "2017-12-29", "start_construction": "2022-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.376545", "long": "0.464968", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7081", "Record Last Updated (dd/mm/yyyy)": "27/01/2020", "Operator (or Applicant)": "RNA Energy", "Site Name": "Sundridge Hill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To South Of A228, Sundridge Hill, Cuxton, Rochester, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME2 1LB", "X-coordinate": "571652", "Y-coordinate": "167049", "Planning Authority": "Medway Council", "Planning Application Reference": "MC/17/3770", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.376545", "long": "0.464968", "status": "planning", "mw": 49, "ext_id": "7081"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/01/2020", "to": "17/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land To South Of A228, Sundridge Hill, Cuxton, Rochester, Kent", "to": "Land To South Of A228, Sundridge Hill, Cuxton, Rochester,", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/03/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7081", "Record Last Updated (dd/mm/yyyy)": "17/03/2022", "Operator (or Applicant)": "RNA Energy", "Site Name": "Sundridge Hill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To South Of A228, Sundridge Hill, Cuxton, Rochester,", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME2 1LB", "X-coordinate": "571652", "Y-coordinate": "167049", "Planning Authority": "Medway Council", "Planning Application Reference": "MC/17/3770", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/02/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.376545", "long": "0.464968", "status": "construction", "mw": 49, "ext_id": "7081"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-27", "start_construction": "2022-03-17", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-12-29", "start_construction": "2022-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sundridge Hill", "name_short": "Sundridge Hill", "owner": "RNA Energy", "state": "south east", "country": "uk", "lat": "51.376545", "long": "0.464968", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.376545+0.464968", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land Adjacent to 4 Redcote Lane (Armley)", "city": "", "id": "334", "external_id": "7111", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Enstor (formerly CJ Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-06-07", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "334", "external_id": "7111", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land Adjacent to 4 Redcote Lane (Armley)", "external_id": "7111", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Enstor (formerly CJ Energy)", "status": "planning", "date_first_heard": "2019-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.804052", "long": "-1.592014", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7111", "Record Last Updated (dd/mm/yyyy)": "12/08/2020", "Operator (or Applicant)": "Enstor (formerly CJ Energy)", "Site Name": "Land Adjacent to 4 Redcote Lane (Armley)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Adjacent, 4 Redcote Lane, Armley, Leeds, West Yorkshire", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS4 2AL", "X-coordinate": "426967", "Y-coordinate": "434272", "Planning Authority": "Leeds City Council", "Planning Application Reference": "17/06830/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2022", "Under Construction": "01/06/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.804052", "long": "-1.592014", "status": "construction", "mw": 49, "ext_id": "7111"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/08/2020", "to": "19/01/2022", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Adjacent, 4 Redcote Lane, Armley, Leeds, West Yorkshire", "to": "Land Adjacent, 4 Redcote Lane, Armley, Leeds, ", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/06/2021", "to": "01/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Development Status", "from": "Under Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12224", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/02/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/01/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "19/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7111", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Enstor (formerly CJ Energy)", "Site Name": "Land Adjacent to 4 Redcote Lane (Armley)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12224", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent, 4 Redcote Lane, Armley, Leeds, ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS4 2AL", "X-coordinate": "426967", "Y-coordinate": "434272", "Planning Authority": "Leeds City Council", "Planning Application Reference": "17/06830/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.804052", "long": "-1.592014", "status": "planning", "mw": 49, "ext_id": "7111"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-06-07", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Land Adjacent to 4 Redcote Lane (Armley)", "name_short": "Land Adjacent to 4 Redcote Lane (Ar...", "owner": "Enstor (formerly CJ Energy)", "state": "yorkshire and humber", "country": "uk", "lat": "53.804052", "long": "-1.592014", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.804052+-1.592014", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Maldon Hall", "city": "", "id": "337", "external_id": "7095", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "337", "external_id": "7095", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Maldon Hall", "external_id": "7095", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Green Investment Group", "status": "planning", "date_first_heard": "2019-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.729339", "long": "0.671188", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7095", "Record Last Updated (dd/mm/yyyy)": "24/07/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Maldon Hall", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land North West Of Maldon Hall, Spital Road, Maldon, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM9 6D", "X-coordinate": "584569", "Y-coordinate": "206779", "Planning Authority": "Maldon District Council", "Planning Application Reference": "17/01106/FUL", "Appeal Reference": "APP/X1545/W/18/3204562", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/12/2017", "Appeal Lodged": "14/01/2019", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "13/05/2019", "Planning Permission Granted": "13/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.729339", "long": "0.671188", "status": "planning", "mw": 40, "ext_id": "7095"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/07/2020", "to": "23/12/2021", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Capbal", "to": "Green Investment Group", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land North West Of Maldon Hall, Spital Road, Maldon, Essex", "to": "Land North West Of Maldon Hall, Spital Road, Maldon", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "13/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/12/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7095", "Record Last Updated (dd/mm/yyyy)": "23/12/2021", "Operator (or Applicant)": "Green Investment Group", "Site Name": "Maldon Hall", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North West Of Maldon Hall, Spital Road, Maldon", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM9 6D", "X-coordinate": "584569", "Y-coordinate": "206779", "Planning Authority": "Maldon District Council", "Planning Application Reference": "17/01106/FUL", "Appeal Reference": "APP/X1545/W/18/3204562", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/12/2017", "Appeal Lodged": "14/01/2019", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "13/05/2019", "Planning Permission Granted": "13/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/05/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.729339", "long": "0.671188", "status": "planning", "mw": 40, "ext_id": "7095"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2019-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Maldon Hall", "name_short": "Maldon Hall", "owner": "Green Investment Group", "state": "eastern", "country": "uk", "lat": "51.729339", "long": "0.671188", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.729339+0.671188", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rubber and Allied Products", "city": "", "id": "339", "external_id": "7096", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "339", "external_id": "7096", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rubber and Allied Products", "external_id": "7096", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Volta Energy Storage", "status": "planning", "date_first_heard": "2017-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.033644", "long": "-2.24969", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7096", "Record Last Updated (dd/mm/yyyy)": "20/04/2020", "Operator (or Applicant)": "Volta Energy Storage", "Site Name": "Rubber and Allied Products", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Rubber & Allied Products Ltd, Turner Crescent, Newcastle-Under-Lyme, Staffordshire", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST5 7LU", "X-coordinate": "383353", "Y-coordinate": "348514", "Planning Authority": "Newcastle Under Lyme Borough Council", "Planning Application Reference": "17/00847/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.033644", "long": "-2.24969", "status": "planning", "mw": 40, "ext_id": "7096"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/04/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/12/2020", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/04/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7096", "Record Last Updated (dd/mm/yyyy)": "20/04/2020", "Operator (or Applicant)": "Volta Energy Storage", "Site Name": "Rubber and Allied Products", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rubber & Allied Products Ltd, Turner Crescent, Newcastle-Under-Lyme, Staffordshire", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST5 7LU", "X-coordinate": "383353", "Y-coordinate": "348514", "Planning Authority": "Newcastle Under Lyme Borough Council", "Planning Application Reference": "17/00847/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.033644", "long": "-2.24969", "status": "planning", "mw": 40, "ext_id": "7096"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2017-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rubber and Allied Products", "name_short": "Rubber and Allied Products", "owner": "Volta Energy Storage", "state": "west midlands", "country": "uk", "lat": "53.033644", "long": "-2.24969", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.033644+-2.24969", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stockbridge Road", "city": "", "id": "340", "external_id": "7097", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Winchester Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "340", "external_id": "7097", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stockbridge Road", "external_id": "7097", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Winchester Power", "status": "planning", "date_first_heard": "2017-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.079417", "long": "-1.345973", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7097", "Record Last Updated (dd/mm/yyyy)": "25/02/2020", "Operator (or Applicant)": "Winchester Power", "Site Name": "Stockbridge Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Stockbridge Road Energy Storag, Land adjacent to B3049, Salters Lane, Winchester, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO22 5FP", "X-coordinate": "445912", "Y-coordinate": "131325", "Planning Authority": "Winchester City Council", "Planning Application Reference": "17/02575/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.079417", "long": "-1.345973", "status": "planning", "mw": 10, "ext_id": "7097"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "14/12/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/02/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/02/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7097", "Record Last Updated (dd/mm/yyyy)": "25/02/2020", "Operator (or Applicant)": "Winchester Power", "Site Name": "Stockbridge Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stockbridge Road Energy Storag, Land adjacent to B3049, Salters Lane, Winchester, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO22 5FP", "X-coordinate": "445912", "Y-coordinate": "131325", "Planning Authority": "Winchester City Council", "Planning Application Reference": "17/02575/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.079417", "long": "-1.345973", "status": "planning", "mw": 10, "ext_id": "7097"}, "current_month": "2024-01", "dates": {"first_heard": "2020-02-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2017-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stockbridge Road", "name_short": "Stockbridge Road", "owner": "Winchester Power", "state": "south east", "country": "uk", "lat": "51.079417", "long": "-1.345973", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.079417+-1.345973", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land North of Thornton Road", "city": "", "id": "347", "external_id": "7131", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "South Redhouse", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "347", "external_id": "7131", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land North of Thornton Road", "external_id": "7131", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "South Redhouse", "status": "planning", "date_first_heard": "2016-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.146096", "long": "-3.142677", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7131", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "South Redhouse", "Site Name": "Land North of Thornton Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5797", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land North of, Thornton Road, Redhouse Grid Substation, Kirkcaldy, Fife", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1", "X-coordinate": "329101", "Y-coordinate": "695410", "Planning Authority": "Fife Council", "Planning Application Reference": "15/04010/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2015", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/02/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.146096", "long": "-3.142677", "status": "planning", "mw": 19, "ext_id": "7131"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "10/02/2019", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "29/04/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7131", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "South Redhouse", "Site Name": "Land North of Thornton Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5797", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North of, Thornton Road, Redhouse Grid Substation, Kirkcaldy, Fife", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1", "X-coordinate": "329101", "Y-coordinate": "695410", "Planning Authority": "Fife Council", "Planning Application Reference": "15/04010/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2015", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/02/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/02/2019", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.146096", "long": "-3.142677", "status": "planning", "mw": 19, "ext_id": "7131"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2016-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Land North of Thornton Road", "name_short": "Land North of Thornton Road", "owner": "South Redhouse", "state": "scotland", "country": "uk", "lat": "56.146096", "long": "-3.142677", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.146096+-3.142677", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North West Of Jameston Farm", "city": "", "id": "348", "external_id": "7133", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "348", "external_id": "7133", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "North West Of Jameston Farm", "external_id": "7133", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Private Developer", "status": "planning", "date_first_heard": "2021-08-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.690455", "long": "-4.671208", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7133", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "North West Of Jameston Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "North West Of Jameston Farm, Dalry, Strathclyde", "County": "North Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 4EY", "X-coordinate": "232189", "Y-coordinate": "647344", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "21/00689/MSC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.690455", "long": "-4.671208", "status": "planning", "mw": 19, "ext_id": "7133"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7133", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "North West Of Jameston Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North West Of Jameston Farm, Dalry, Strathclyde", "County": "North Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 4EY", "X-coordinate": "232189", "Y-coordinate": "647344", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "21/00689/MSC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.690455", "long": "-4.671208", "status": "planning", "mw": 19, "ext_id": "7133"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2021-08-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "North West Of Jameston Farm", "name_short": "North West Of Jameston Farm", "owner": "Private Developer", "state": "scotland", "country": "uk", "lat": "55.690455", "long": "-4.671208", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.690455+-4.671208", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land Adj Harmer Warren Quarry", "city": "", "id": "351", "external_id": "7143", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "New Forest Energy (formerly Somerley Estate)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "351", "external_id": "7143", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land Adj Harmer Warren Quarry", "external_id": "7143", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "New Forest Energy (formerly Somerley Estate)", "status": "construction", "date_first_heard": "2018-02-13", "start_construction": "2022-11-16", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.886637", "long": "-1.812153", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7143", "Record Last Updated (dd/mm/yyyy)": "09/12/2022", "Operator (or Applicant)": "New Forest Energy (formerly Somerley Estate)", "Site Name": "Land Adj Harmer Warren Quarry", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "BH24 3PZ", "X-coordinate": "413310", "Y-coordinate": "109700", "Planning Authority": "New Forest District Council", "Planning Application Reference": "17/11630", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/02/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "16/11/2022", "Operational": "", "Heat Network Ref": "", "lat": "50.886637", "long": "-1.812153", "status": "construction", "mw": 10, "ext_id": "7143"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/12/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/12/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7143", "Record Last Updated (dd/mm/yyyy)": "09/12/2022", "Operator (or Applicant)": "New Forest Energy (formerly Somerley Estate)", "Site Name": "Land Adj Harmer Warren Quarry", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "BH24 3PZ", "X-coordinate": "413310", "Y-coordinate": "109700", "Planning Authority": "New Forest District Council", "Planning Application Reference": "17/11630", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/02/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "16/11/2022", "Operational": "", "Heat Network Ref": "", "lat": "50.886637", "long": "-1.812153", "status": "construction", "mw": 10, "ext_id": "7143"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-02-13", "start_construction": "2022-11-16", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Land Adj Harmer Warren Quarry", "name_short": "Land Adj Harmer Warren Quarry", "owner": "New Forest Energy (formerly Somerley Estate)", "state": "south east", "country": "uk", "lat": "50.886637", "long": "-1.812153", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.886637+-1.812153", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane - Resubmission", "city": "", "id": "352", "external_id": "7149", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "352", "external_id": "7149", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane", "external_id": "7149", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Walker & Son (Hauliers) Limited", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.718198", "long": "-1.276097", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7149", "Record Last Updated (dd/mm/yyyy)": "20/04/2020", "Operator (or Applicant)": "Volta Energy Storage", "Site Name": "Kirkhaw Lane - Resubmission", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, West Yorkshire", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447870", "Y-coordinate": "424886", "Planning Authority": "Wakefield Council", "Planning Application Reference": "17/02739/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.718198", "long": "-1.276097", "status": "planning", "mw": 20, "ext_id": "7149"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/04/2020", "to": "10/01/2022", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, West Yorkshire", "to": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2022", "to": "24/02/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Volta Energy Storage", "to": "Walker & Son (Hauliers) Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Kirkhaw Lane - Resubmission", "to": "Kirkhaw Lane", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Co-located with fossil fuel plant", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Wakefield Council", "to": "Wakefield Metropolitan District Council", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "24/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7149", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8430", "Are they re-applying (Old REPD Ref) ": "", "Address": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447870", "Y-coordinate": "424886", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "17/02739/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.718198", "long": "-1.276097", "status": "planning", "mw": 20, "ext_id": "7149"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane", "name_short": "Kirkhaw Lane", "owner": "Walker & Son (Hauliers) Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.718198", "long": "-1.276097", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.718198+-1.276097", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greenburn Wind Park", "city": "", "id": "355", "external_id": "7159", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Energy Consents And Deployment Unit", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "355", "external_id": "7159", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Greenburn Wind Park", "external_id": "7159", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "REG Windpower Limited", "status": "planning", "date_first_heard": "2023-04-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.404377", "long": "-4.269049", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7159", "Record Last Updated (dd/mm/yyyy)": "24/06/2020", "Operator (or Applicant)": "Energy Consents And Deployment Unit", "Site Name": "Greenburn Wind Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7865", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land Adj Former Opencast, Greenburn Wind Park, New Cumnock, Cumnock, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256423", "Y-coordinate": "614614", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002037", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.404377", "long": "-4.269049", "status": "planning", "mw": 10, "ext_id": "7159"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/06/2020", "to": "10/05/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Energy Consents And Deployment Unit", "to": "REG Windpower Limited", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/04/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/04/2029", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7159", "Record Last Updated (dd/mm/yyyy)": "10/05/2023", "Operator (or Applicant)": "REG Windpower Limited", "Site Name": "Greenburn Wind Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7865", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adj Former Opencast, Greenburn Wind Park, New Cumnock, Cumnock, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256423", "Y-coordinate": "614614", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002037", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/04/2029", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.404377", "long": "-4.269049", "status": "planning", "mw": 10, "ext_id": "7159"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-04-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Greenburn Wind Park", "name_short": "Greenburn Wind Park", "owner": "REG Windpower Limited", "state": "scotland", "country": "uk", "lat": "55.404377", "long": "-4.269049", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.404377+-4.269049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Braintree Road Substation", "city": "", "id": "356", "external_id": "7161", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-01-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "356", "external_id": "7161", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Braintree Road Substation", "external_id": "7161", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2019-01-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.864838", "long": "0.578226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7161", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Braintree Road Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Electricity Sub Station, Braintree Road, 209m From Hoppit House Braintr, 65m From Unnamed Road Cressing, Braintree, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM77 8DJ", "X-coordinate": "577617", "Y-coordinate": "221615", "Planning Authority": "Braintree District Council", "Planning Application Reference": "18/01927/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.864838", "long": "0.578226", "status": "planning", "mw": 49, "ext_id": "7161"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "06/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "11995", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "06/09/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7161", "Record Last Updated (dd/mm/yyyy)": "06/09/2022", "Operator (or Applicant)": "Pivot Power", "Site Name": "Braintree Road Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11995", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Sub Station, Braintree Road, 209m From Hoppit House Braintr, 65m From Unnamed Road Cressing, Braintree, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM77 8DJ", "X-coordinate": "577617", "Y-coordinate": "221615", "Planning Authority": "Braintree District Council", "Planning Application Reference": "18/01927/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.864838", "long": "0.578226", "status": "planning", "mw": 49, "ext_id": "7161"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-01-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Braintree Road Substation", "name_short": "Braintree Road Substation", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "51.864838", "long": "0.578226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.864838+0.578226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Osbaldwick Substation", "city": "", "id": "358", "external_id": "7172", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-02-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "358", "external_id": "7172", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Osbaldwick Substation", "external_id": "7172", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "construction", "date_first_heard": "2020-10-08", "start_construction": "2022-05-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.957798", "long": "-1.019392", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7172", "Record Last Updated (dd/mm/yyyy)": "14/11/2019", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Osbaldwick Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Os Field 5070, Hull Road, Dunnington, York, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO19 5L", "X-coordinate": "464442", "Y-coordinate": "451746", "Planning Authority": "York City Council", "Planning Application Reference": "18/02659/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/02/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/02/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.957798", "long": "-1.019392", "status": "planning", "mw": 49, "ext_id": "7172"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/11/2019", "to": "27/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Os Field 5070, Hull Road, Dunnington, York, North Yorkshire", "to": "Os Field 5070, Hull Road, Dunnington, York, ", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "18/02659/OUT", "to": "20/01515/REM", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "21/11/2018", "to": "21/08/2020", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "22/02/2019", "to": "08/10/2020", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "22/02/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/05/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/07/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7172", "Record Last Updated (dd/mm/yyyy)": "27/07/2022", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Osbaldwick Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Os Field 5070, Hull Road, Dunnington, York, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO19 5L", "X-coordinate": "464442", "Y-coordinate": "451746", "Planning Authority": "York City Council", "Planning Application Reference": "20/01515/REM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/05/2022", "Operational": "", "Heat Network Ref": "", "lat": "53.957798", "long": "-1.019392", "status": "construction", "mw": 49, "ext_id": "7172"}, "current_month": "2024-01", "dates": {"first_heard": "2019-11-14", "start_construction": "2022-07-27", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-10-08", "start_construction": "2022-05-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Osbaldwick Substation", "name_short": "Osbaldwick Substation", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.957798", "long": "-1.019392", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.957798+-1.019392", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Old Green Farm, Alveston Battery Storage", "city": "", "id": "360", "external_id": "7182", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "360", "external_id": "7182", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Old Green Farm, Alveston Battery Storage", "external_id": "7182", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Ecotricity", "status": "planning", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.559454", "long": "-2.506961", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7182", "Record Last Updated (dd/mm/yyyy)": "03/08/2020", "Operator (or Applicant)": "Ecotricity", "Site Name": "Old Green Farm, Alveston Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Agricultural Field Circa 600M South Of Earthcott Green And Circa 297M East Of The B4427", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS35 3TD", "X-coordinate": "364952", "Y-coordinate": "184630", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "PT17/1992/RVC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.559454", "long": "-2.506961", "status": "planning", "mw": 10, "ext_id": "7182"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/08/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/08/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7182", "Record Last Updated (dd/mm/yyyy)": "03/08/2020", "Operator (or Applicant)": "Ecotricity", "Site Name": "Old Green Farm, Alveston Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Agricultural Field Circa 600M South Of Earthcott Green And Circa 297M East Of The B4427", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS35 3TD", "X-coordinate": "364952", "Y-coordinate": "184630", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "PT17/1992/RVC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.559454", "long": "-2.506961", "status": "planning", "mw": 10, "ext_id": "7182"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Old Green Farm, Alveston Battery Storage", "name_short": "Old Green Farm, Alveston", "owner": "Ecotricity", "state": "south west", "country": "uk", "lat": "51.559454", "long": "-2.506961", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.559454+-2.506961", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wentlooge Renewable Energy Hub", "city": "", "id": "364", "external_id": "7192", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "62", "power_mw": "62", "customer": "", "owner": "Wentlooge Farmers' Solar Scheme", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "364", "external_id": "7192", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wentlooge Renewable Energy Hub", "external_id": "7192", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 62, "power_mw": 62, "owner": "Wentlooge Farmers' Solar Scheme", "status": "planning", "date_first_heard": "2019-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.531497", "long": "-3.045377", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7192", "Record Last Updated (dd/mm/yyyy)": "22/03/2019", "Operator (or Applicant)": "Wentlooge Farmers' Solar Scheme", "Site Name": "Wentlooge Renewable Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7191", "Installed Capacity (MWelec)": "62.5", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11279", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land SW of St Brides on the Gwent Levels", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "", "X-coordinate": "327583", "Y-coordinate": "181917", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3216558", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "10/09/2021", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.531497", "long": "-3.045377", "status": "planning", "mw": 62, "ext_id": "7192"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/03/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "22/03/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7192", "Record Last Updated (dd/mm/yyyy)": "22/03/2019", "Operator (or Applicant)": "Wentlooge Farmers' Solar Scheme", "Site Name": "Wentlooge Renewable Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7191", "Installed Capacity (MWelec)": "62.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11279", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land SW of St Brides on the Gwent Levels", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "", "X-coordinate": "327583", "Y-coordinate": "181917", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3216558", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "10/09/2021", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.531497", "long": "-3.045377", "status": "planning", "mw": 62, "ext_id": "7192"}, "current_month": "2024-01", "dates": {"first_heard": "2019-03-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 62, "mwh_is_estimate": true, "mwh": 62, "mwh_estimate": 62, "status": "planning", "status_class": "", "date_first_heard": "2019-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wentlooge Renewable Energy Hub", "name_short": "Wentlooge Renewable Energy Hub", "owner": "Wentlooge Farmers' Solar Scheme", "state": "wales", "country": "uk", "lat": "51.531497", "long": "-3.045377", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.531497+-3.045377", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Classic Marble Showers Site", "city": "", "id": "365", "external_id": "7208", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "48", "customer": "", "owner": "Engie Developments Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "365", "external_id": "7208", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Classic Marble Showers Site", "external_id": "7208", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 48, "power_mw": 48, "owner": "Engie Developments Ireland", "status": "planning", "date_first_heard": "2019-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.485653", "long": "-7.114167", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7208", "Record Last Updated (dd/mm/yyyy)": "16/04/2020", "Operator (or Applicant)": "Engie Developments Ireland", "Site Name": "Classic Marble Showers Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "48.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, Co Tyrone", "County": "Co. Fermanagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT70 2EW", "X-coordinate": "68914", "Y-coordinate": "522080", "Planning Authority": "Fermanagh and Omagh", "Planning Application Reference": "LA10/2018/1589/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.485653", "long": "-7.114167", "status": "planning", "mw": 48, "ext_id": "7208"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, Co Tyrone", "to": "South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/04/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "16/04/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7208", "Record Last Updated (dd/mm/yyyy)": "16/04/2020", "Operator (or Applicant)": "Engie Developments Ireland", "Site Name": "Classic Marble Showers Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "48", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7979", "Are they re-applying (Old REPD Ref) ": "", "Address": "South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, ", "County": "Co. Fermanagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT70 2EW", "X-coordinate": "68914", "Y-coordinate": "522080", "Planning Authority": "Fermanagh and Omagh", "Planning Application Reference": "LA10/2018/1589/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.485653", "long": "-7.114167", "status": "planning", "mw": 48, "ext_id": "7208"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 48, "mwh_is_estimate": true, "mwh": 48, "mwh_estimate": 48, "status": "planning", "status_class": "", "date_first_heard": "2019-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Classic Marble Showers Site", "name_short": "Classic Marble Showers Site", "owner": "Engie Developments Ireland", "state": "northern ireland", "country": "uk", "lat": "54.485653", "long": "-7.114167", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.485653+-7.114167", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pleasance Road", "city": "", "id": "366", "external_id": "7217", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Coronation Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "366", "external_id": "7217", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pleasance Road", "external_id": "7217", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Coronation Power", "status": "planning", "date_first_heard": "2019-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.537847", "long": "-3.272834", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7217", "Record Last Updated (dd/mm/yyyy)": "23/01/2020", "Operator (or Applicant)": "Coronation Power", "Site Name": "Pleasance Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land 130M S/E of, Pleasance Road, Coupar Angus Substation, Blairgowrie, Tayside", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9JB", "X-coordinate": "321821", "Y-coordinate": "739152", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "19/00513/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.537847", "long": "-3.272834", "status": "planning", "mw": 45, "ext_id": "7217"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/01/2020", "to": "08/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/03/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "08/03/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7217", "Record Last Updated (dd/mm/yyyy)": "08/03/2022", "Operator (or Applicant)": "Coronation Power", "Site Name": "Pleasance Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9997", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 130M S/E of, Pleasance Road, Coupar Angus Substation, Blairgowrie, Tayside", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9JB", "X-coordinate": "321821", "Y-coordinate": "739152", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "19/00513/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.537847", "long": "-3.272834", "status": "planning", "mw": 45, "ext_id": "7217"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2019-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Pleasance Road", "name_short": "Pleasance Road", "owner": "Coronation Power", "state": "scotland", "country": "uk", "lat": "56.537847", "long": "-3.272834", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.537847+-3.272834", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackpark Farm ", "city": "", "id": "367", "external_id": "7226", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Shires Hamilton ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "367", "external_id": "7226", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackpark Farm ", "external_id": "7226", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Shires Hamilton ", "status": "planning", "date_first_heard": "2019-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.211675", "long": "-3.827596", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7226", "Record Last Updated (dd/mm/yyyy)": "22/08/2019", "Operator (or Applicant)": "Shires Hamilton ", "Site Name": "Blackpark Farm ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Black Park Farm, Nairn, Highlands", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5HY", "X-coordinate": "289712", "Y-coordinate": "814915", "Planning Authority": "Highland Council", "Planning Application Reference": "19/00702/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.211675", "long": "-3.827596", "status": "planning", "mw": 20, "ext_id": "7226"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Black Park Farm, Nairn, Highlands", "to": "Black Park Farm, Nairn, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/08/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "22/08/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7226", "Record Last Updated (dd/mm/yyyy)": "22/08/2019", "Operator (or Applicant)": "Shires Hamilton ", "Site Name": "Blackpark Farm ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8105", "Are they re-applying (Old REPD Ref) ": "", "Address": "Black Park Farm, Nairn, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5HY", "X-coordinate": "289712", "Y-coordinate": "814915", "Planning Authority": "Highland Council", "Planning Application Reference": "19/00702/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.211675", "long": "-3.827596", "status": "planning", "mw": 20, "ext_id": "7226"}, "current_month": "2024-01", "dates": {"first_heard": "2019-08-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2019-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackpark Farm ", "name_short": "Blackpark Farm ", "owner": "Shires Hamilton ", "state": "scotland", "country": "uk", "lat": "57.211675", "long": "-3.827596", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.211675+-3.827596", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sundon Substation", "city": "", "id": "370", "external_id": "7283", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "370", "external_id": "7283", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sundon Substation", "external_id": "7283", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2019-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.930088", "long": "-0.498665", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7283", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Sundon Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sundon 400KV Substation, Waterend Lane, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UL", "X-coordinate": "503325", "Y-coordinate": "226795", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/19/00200/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.930088", "long": "-0.498665", "status": "planning", "mw": 49, "ext_id": "7283"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Sundon 400KV Substation, Waterend Lane, Chalton, Luton, Bedfordshire", "to": "Sundon 400KV Substation, Waterend Lane, Chalton,", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "30/04/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7283", "Record Last Updated (dd/mm/yyyy)": "30/04/2019", "Operator (or Applicant)": "Pivot Power", "Site Name": "Sundon Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9315", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sundon 400KV Substation, Waterend Lane, Chalton,", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UL", "X-coordinate": "503325", "Y-coordinate": "226795", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/19/00200/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.930088", "long": "-0.498665", "status": "planning", "mw": 49, "ext_id": "7283"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sundon Substation", "name_short": "Sundon Substation", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "51.930088", "long": "-0.498665", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.930088+-0.498665", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jamesfield Organic Centre", "city": "Abernethy", "id": "373", "external_id": "7315", "state": "fife", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 130", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "373", "external_id": "7315", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Jamesfield Organic Centre, Phase 2", "external_id": "7315", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Harmony Energy Storage", "status": "planning", "date_first_heard": "2019-03-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.342816", "long": "-3.291569", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7315", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Fife", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "320261", "Y-coordinate": "717467", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "18/02336/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/03/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/03/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.342816", "long": "-3.291569", "status": "planning", "mw": 19, "ext_id": "7315"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "26/01/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Jamesfield Organic Centre", "to": "Jamesfield Organic Centre, Phase 2", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Fife", "to": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, ", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "06/03/2022", "to": "30/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/01/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "07/03/2019", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7315", "Record Last Updated (dd/mm/yyyy)": "07/03/2019", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre, Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10863", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, ", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "320261", "Y-coordinate": "717467", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "18/02336/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/03/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.342816", "long": "-3.291569", "status": "planning", "mw": 19, "ext_id": "7315"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2019-03-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Jamesfield Organic Centre, Phase 2", "name_short": "Jamesfield Organic Centre, Phase 2", "owner": "Harmony Energy Storage", "state": "scotland", "country": "uk", "lat": "56.342816", "long": "-3.291569", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.342816+-3.291569", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 130"], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Troston Loch Wind Farm", "city": "", "id": "374", "external_id": "7333", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "374", "external_id": "7333", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Troston Loch Wind Farm", "external_id": "7333", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2020-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.187688", "long": "-4.06752", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7333", "Record Last Updated (dd/mm/yyyy)": "16/01/2021", "Operator (or Applicant)": "EDF Renewables", "Site Name": "Troston Loch Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6432", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Troston Loch Wind Farm, New Abbey, West Of Moniaive, Dumfries, Dumfries and Galloway", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG2 8EF", "X-coordinate": "268466", "Y-coordinate": "590107", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001785", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/12/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.187688", "long": "-4.06752", "status": "planning", "mw": 20, "ext_id": "7333"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/01/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "18/12/2020", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "EDF Renewables", "to": "EDF Energy Renewables", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "18/12/2023", "to": "18/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7333", "Record Last Updated (dd/mm/yyyy)": "18/12/2020", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Troston Loch Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6432", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Troston Loch Wind Farm, New Abbey, West Of Moniaive, Dumfries, Dumfries and Galloway", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG2 8EF", "X-coordinate": "268466", "Y-coordinate": "590107", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001785", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.187688", "long": "-4.06752", "status": "planning", "mw": 20, "ext_id": "7333"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2020-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Troston Loch Wind Farm", "name_short": "Troston Loch Wind Farm", "owner": "EDF Energy Renewables", "state": "scotland", "country": "uk", "lat": "55.187688", "long": "-4.06752", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.187688+-4.06752", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tollgate Farm Battery Storage (Resubmission)", "city": "", "id": "375", "external_id": "7335", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "375", "external_id": "7335", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tollgate Farm Battery Storage ", "external_id": "7335", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RNA Energy / Harmony Energy Storage/ Tag Energy UK", "status": "construction", "date_first_heard": "2018-01-05", "start_construction": "2022-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.735231", "long": "-0.237166", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7335", "Record Last Updated (dd/mm/yyyy)": "27/01/2020", "Operator (or Applicant)": "RNA Energy", "Site Name": "Tollgate Farm Battery Storage (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Tollgate Farm, Tollgate Road, North Mymms", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "AL4 0NY", "X-coordinate": "521828", "Y-coordinate": "205528", "Planning Authority": "Welwyn Hatfield Borough Council", "Planning Application Reference": "6/2017/2340/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.735231", "long": "-0.237166", "status": "planning", "mw": 49, "ext_id": "7335"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/01/2020", "to": "23/12/2021", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "RNA Energy", "to": "RNA Energy / Harmony Energy Storage/ Tag Energy UK", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/12/2021", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Tollgate Farm Battery Storage (Resubmission)", "to": "Tollgate Farm Battery Storage ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7335", "Record Last Updated (dd/mm/yyyy)": "01/02/2022", "Operator (or Applicant)": "RNA Energy / Harmony Energy Storage/ Tag Energy UK", "Site Name": "Tollgate Farm Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6949", "Address": "Tollgate Farm, Tollgate Road, North Mymms", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "AL4 0NY", "X-coordinate": "521828", "Y-coordinate": "205528", "Planning Authority": "Welwyn Hatfield Borough Council", "Planning Application Reference": "6/2017/2340/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/02/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.735231", "long": "-0.237166", "status": "construction", "mw": 49, "ext_id": "7335"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-27", "start_construction": "2022-02-01", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-01-05", "start_construction": "2022-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tollgate Farm Battery Storage ", "name_short": "Tollgate Farm Battery Storage ", "owner": "RNA Energy / Harmony Energy Storage/ Tag Energy UK", "state": "eastern", "country": "uk", "lat": "51.735231", "long": "-0.237166", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.735231+-0.237166", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Plot 2B EurolinkV", "city": "", "id": "378", "external_id": "7383", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Trenport Investments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "378", "external_id": "7383", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Plot 2B EurolinkV", "external_id": "7383", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Trenport Investments", "status": "construction", "date_first_heard": "2019-10-25", "start_construction": "2021-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.346306", "long": "0.769266", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7383", "Record Last Updated (dd/mm/yyyy)": "31/01/2020", "Operator (or Applicant)": "Trenport Investments", "Site Name": "Plot 2B EurolinkV", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME9 9AR", "X-coordinate": "592954", "Y-coordinate": "164443", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "19/502257/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/10/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/10/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.346306", "long": "0.769266", "status": "planning", "mw": 20, "ext_id": "7383"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2020", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne, Kent", "to": "Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/12/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "13/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7383", "Record Last Updated (dd/mm/yyyy)": "13/12/2021", "Operator (or Applicant)": "Trenport Investments", "Site Name": "Plot 2B EurolinkV", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME9 9AR", "X-coordinate": "592954", "Y-coordinate": "164443", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "19/502257/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/10/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/10/2022", "Under Construction": "01/10/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.346306", "long": "0.769266", "status": "construction", "mw": 20, "ext_id": "7383"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-31", "start_construction": "2021-12-13", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-10-25", "start_construction": "2021-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Plot 2B EurolinkV", "name_short": "Plot 2B EurolinkV", "owner": "Trenport Investments", "state": "south east", "country": "uk", "lat": "51.346306", "long": "0.769266", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.346306+0.769266", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aurora Solar Farm", "city": "", "id": "379", "external_id": "7385", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "Low Carbon UK Solar Investment Company", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "379", "external_id": "7385", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Aurora Solar Farm", "external_id": "7385", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 18, "power_mw": 18, "owner": "Low Carbon UK Solar Investment Company", "status": "construction", "date_first_heard": "2020-03-23", "start_construction": "2021-04-26", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.780977", "long": "-1.403578", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7385", "Record Last Updated (dd/mm/yyyy)": "04/06/2020", "Operator (or Applicant)": "Low Carbon UK Solar Investment Company", "Site Name": "Aurora Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7384", "Installed Capacity (MWelec)": "18.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, Oxfordshire", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX29 4BH", "X-coordinate": "441242", "Y-coordinate": "209314", "Planning Authority": "West Oxfordshire District Council", "Planning Application Reference": "19/02516/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.780977", "long": "-1.403578", "status": "planning", "mw": 18, "ext_id": "7385"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, Oxfordshire", "to": "Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/06/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "26/04/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7385", "Record Last Updated (dd/mm/yyyy)": "23/03/2023", "Operator (or Applicant)": "Low Carbon UK Solar Investment Company", "Site Name": "Aurora Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7384", "Installed Capacity (MWelec)": "18", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, ", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX29 4BH", "X-coordinate": "441242", "Y-coordinate": "209314", "Planning Authority": "West Oxfordshire District Council", "Planning Application Reference": "19/02516/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/03/2023", "Under Construction": "26/04/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.780977", "long": "-1.403578", "status": "construction", "mw": 18, "ext_id": "7385"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 18, "mwh_is_estimate": true, "mwh": 18, "mwh_estimate": 18, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-03-23", "start_construction": "2021-04-26", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Aurora Solar Farm", "name_short": "Aurora Solar Farm", "owner": "Low Carbon UK Solar Investment Company", "state": "south east", "country": "uk", "lat": "51.780977", "long": "-1.403578", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.780977+-1.403578", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Harestanes Windfarm", "city": "", "id": "380", "external_id": "7395", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "380", "external_id": "7395", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Harestanes Windfarm", "external_id": "7395", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.264014", "long": "-3.560109", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7395", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Harestanes Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4119", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Harestanes Windfarm, Forest Of Ae, Northwest Of Ae Village, Moffat, Dumfries and Galloway", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "300958", "Y-coordinate": "597760", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001870", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.264014", "long": "-3.560109", "status": "planning", "mw": 100, "ext_id": "7395"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7395", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Harestanes Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4119", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Harestanes Windfarm, Forest Of Ae, Northwest Of Ae Village, Moffat, Dumfries and Galloway", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "300958", "Y-coordinate": "597760", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001870", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.264014", "long": "-3.560109", "status": "planning", "mw": 100, "ext_id": "7395"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Harestanes Windfarm", "name_short": "Harestanes Windfarm", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "55.264014", "long": "-3.560109", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.264014+-3.560109", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trevol Business Park", "city": "", "id": "382", "external_id": "7404", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Londonwide Properties", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "382", "external_id": "7404", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Trevol Business Park", "external_id": "7404", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Londonwide Properties", "status": "planning", "date_first_heard": "2019-09-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.376261", "long": "-4.226543", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7404", "Record Last Updated (dd/mm/yyyy)": "23/01/2020", "Operator (or Applicant)": "Londonwide Properties", "Site Name": "Trevol Business Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At, Trevol Business Park, Torpoint, Cornwall", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL11 2TB", "X-coordinate": "241778", "Y-coordinate": "55300", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA19/03228", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.376261", "long": "-4.226543", "status": "planning", "mw": 10, "ext_id": "7404"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/01/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7404", "Record Last Updated (dd/mm/yyyy)": "23/01/2020", "Operator (or Applicant)": "Londonwide Properties", "Site Name": "Trevol Business Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At, Trevol Business Park, Torpoint, Cornwall", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL11 2TB", "X-coordinate": "241778", "Y-coordinate": "55300", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA19/03228", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.376261", "long": "-4.226543", "status": "planning", "mw": 10, "ext_id": "7404"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2019-09-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Trevol Business Park", "name_short": "Trevol Business Park", "owner": "Londonwide Properties", "state": "south west", "country": "uk", "lat": "50.376261", "long": "-4.226543", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.376261+-4.226543", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Douglas West Wind Farm (extension)", "city": "", "id": "384", "external_id": "7460", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Douglas West Extension / 3R Energy Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "384", "external_id": "7460", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Douglas West Wind Farm (extension)", "external_id": "7460", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Douglas West Extension / 3R Energy Solutions", "status": "planning", "date_first_heard": "2019-07-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.587358", "long": "-3.890104", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7460", "Record Last Updated (dd/mm/yyyy)": "02/07/2019", "Operator (or Applicant)": "Douglas West Extension / 3R Energy Solutions", "Site Name": "Douglas West Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6826", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0NN", "X-coordinate": "280968", "Y-coordinate": "634257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001836", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.587358", "long": "-3.890104", "status": "planning", "mw": 20, "ext_id": "7460"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/07/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "02/07/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7460", "Record Last Updated (dd/mm/yyyy)": "02/07/2019", "Operator (or Applicant)": "Douglas West Extension / 3R Energy Solutions", "Site Name": "Douglas West Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6826", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0NN", "X-coordinate": "280968", "Y-coordinate": "634257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001836", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.587358", "long": "-3.890104", "status": "planning", "mw": 20, "ext_id": "7460"}, "current_month": "2024-01", "dates": {"first_heard": "2019-07-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2019-07-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Douglas West Wind Farm (extension)", "name_short": "Douglas West Wind Farm (extension)", "owner": "Douglas West Extension / 3R Energy Solutions", "state": "scotland", "country": "uk", "lat": "55.587358", "long": "-3.890104", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.587358+-3.890104", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Harker Grid Sub Station", "city": "", "id": "385", "external_id": "7462", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "385", "external_id": "7462", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Harker Grid Sub Station", "external_id": "7462", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2019-07-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.942299", "long": "-2.96397", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7462", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Harker Grid Sub Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land to the west of Harker Grid Sub Station, Low Harker, Harker, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4DQ", "X-coordinate": "338345", "Y-coordinate": "561274", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "19/0371", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/07/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.942299", "long": "-2.96397", "status": "planning", "mw": 49, "ext_id": "7462"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7462", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Harker Grid Sub Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the west of Harker Grid Sub Station, Low Harker, Harker, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4DQ", "X-coordinate": "338345", "Y-coordinate": "561274", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "19/0371", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/07/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.942299", "long": "-2.96397", "status": "planning", "mw": 49, "ext_id": "7462"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-07-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Harker Grid Sub Station", "name_short": "Harker Grid Sub Station", "owner": "Pivot Power", "state": "north west", "country": "uk", "lat": "54.942299", "long": "-2.96397", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.942299+-2.96397", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bramford Substation", "city": "", "id": "386", "external_id": "7479", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "386", "external_id": "7479", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bramford Substation", "external_id": "7479", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Pivot Power", "status": "construction", "date_first_heard": "2019-09-23", "start_construction": "2023-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.072856", "long": "1.065047", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7479", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Bramford Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land Adjacent To, Bullen Lane, Bramford, Ipswich, Suffolk", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP8 4JH", "X-coordinate": "610154", "Y-coordinate": "246043", "Planning Authority": "Mid Suffolk District Council", "Planning Application Reference": "DC/19/03008", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.072856", "long": "1.065047", "status": "planning", "mw": 49, "ext_id": "7479"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "23/05/2023", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "49.9", "to": "57", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 49, "to": 57, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7479", "Record Last Updated (dd/mm/yyyy)": "23/05/2023", "Operator (or Applicant)": "Pivot Power", "Site Name": "Bramford Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent To, Bullen Lane, Bramford, Ipswich, Suffolk", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP8 4JH", "X-coordinate": "610154", "Y-coordinate": "246043", "Planning Authority": "Mid Suffolk District Council", "Planning Application Reference": "DC/19/03008", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/09/2022", "Under Construction": "01/06/2023", "Operational": "", "Heat Network Ref": "", "lat": "52.072856", "long": "1.065047", "status": "construction", "mw": 57, "ext_id": "7479"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "2023-05-23", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-09-23", "start_construction": "2023-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bramford Substation", "name_short": "Bramford Substation", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "52.072856", "long": "1.065047", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.072856+1.065047", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Salisbury Substation", "city": "Salisbury", "id": "388", "external_id": "7510", "state": "wiltshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49.5", "customer": "", "owner": "SSE", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "Harmony sold in 2021", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "388", "external_id": "7510", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Salisbury Substation", "external_id": "7510", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "SSE Renewables", "status": "construction", "date_first_heard": "2020-03-05", "start_construction": "2022-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.082033", "long": "-1.852165", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7510", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Salisbury Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land Adjacent To, Salisbury Substation, Wilton, Salisbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SP2 0BL", "X-coordinate": "410452", "Y-coordinate": "131423", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/05443/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.082033", "long": "-1.852165", "status": "planning", "mw": 49, "ext_id": "7510"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "04/07/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Harmony Energy Storage", "to": "SSE Renewables", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Adjacent To, Salisbury Substation, Wilton, Salisbury, Wiltshire", "to": "Land Adjacent To, Salisbury Substation, Wilton, Salisbury, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/07/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/09/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "16/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7510", "Record Last Updated (dd/mm/yyyy)": "16/03/2023", "Operator (or Applicant)": "SSE Renewables", "Site Name": "Salisbury Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent To, Salisbury Substation, Wilton, Salisbury, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SP2 0BL", "X-coordinate": "410452", "Y-coordinate": "131423", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/05443/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/03/2023", "Under Construction": "01/09/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.082033", "long": "-1.852165", "status": "construction", "mw": 49, "ext_id": "7510"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-03-05", "start_construction": "2022-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Salisbury Substation", "name_short": "Salisbury Substation", "owner": "SSE Renewables", "state": "south west", "country": "uk", "lat": "51.082033", "long": "-1.852165", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.082033+-1.852165", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Harmony sold in 2021"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cowley electricity sub-station", "city": "", "id": "391", "external_id": "7571", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "391", "external_id": "7571", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cowley electricity sub-station", "external_id": "7571", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "construction", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.717588", "long": "-1.185977", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7571", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Cowley electricity sub-station", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Cowley Main Sub Station, Lower Blackberry Lane, Garsington, Oxford ", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX44 9BD", "X-coordinate": "456332", "Y-coordinate": "202409", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P19/S0623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/11/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.717588", "long": "-1.185977", "status": "construction", "mw": 49, "ext_id": "7571"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7571", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Cowley electricity sub-station", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cowley Main Sub Station, Lower Blackberry Lane, Garsington, Oxford ", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX44 9BD", "X-coordinate": "456332", "Y-coordinate": "202409", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P19/S0623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/11/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.717588", "long": "-1.185977", "status": "construction", "mw": 49, "ext_id": "7571"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cowley electricity sub-station", "name_short": "Cowley electricity sub-station", "owner": "Pivot Power", "state": "south east", "country": "uk", "lat": "51.717588", "long": "-1.185977", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.717588+-1.185977", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lisnabreeny Road", "city": "", "id": "392", "external_id": "7556", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Energia Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "392", "external_id": "7556", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lisnabreeny Road", "external_id": "7556", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 36, "power_mw": 36, "owner": "Energia Group", "status": "planning", "date_first_heard": "2020-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.555765", "long": "-5.864088", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7556", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "Energia Group", "Site Name": "Lisnabreeny Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Lands to the southeast of, 1 Lisnabreeny Road East, Belfast, Co Antrim", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT6 9SS", "X-coordinate": "150249", "Y-coordinate": "524705", "Planning Authority": "Belfast City Council", "Planning Application Reference": "LA05/2019/0675/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.555765", "long": "-5.864088", "status": "planning", "mw": 36, "ext_id": "7556"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7556", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "Energia Group", "Site Name": "Lisnabreeny Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lands to the southeast of, 1 Lisnabreeny Road East, Belfast, Co Antrim", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT6 9SS", "X-coordinate": "150249", "Y-coordinate": "524705", "Planning Authority": "Belfast City Council", "Planning Application Reference": "LA05/2019/0675/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.555765", "long": "-5.864088", "status": "planning", "mw": 36, "ext_id": "7556"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 36, "mwh_is_estimate": true, "mwh": 36, "mwh_estimate": 36, "status": "planning", "status_class": "", "date_first_heard": "2020-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lisnabreeny Road", "name_short": "Lisnabreeny Road", "owner": "Energia Group", "state": "northern ireland", "country": "uk", "lat": "54.555765", "long": "-5.864088", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.555765+-5.864088", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hagshaw Hill", "city": "", "id": "393", "external_id": "7572", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-02-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "393", "external_id": "7572", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hagshaw Hill", "external_id": "7572", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Scottish Power Renewables", "status": "planning", "date_first_heard": "2020-02-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.559423", "long": "-3.870987", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7572", "Record Last Updated (dd/mm/yyyy)": "25/03/2020", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Hagshaw Hill", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7456", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Hagshaw Hill Wind Farm, Douglas, Lanark ", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0RR", "X-coordinate": "282089", "Y-coordinate": "631116", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000737", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/02/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/02/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.559423", "long": "-3.870987", "status": "planning", "mw": 20, "ext_id": "7572"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "26/02/2023", "to": "26/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/03/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/03/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7572", "Record Last Updated (dd/mm/yyyy)": "25/03/2020", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Hagshaw Hill", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7456", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hagshaw Hill Wind Farm, Douglas, Lanark ", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0RR", "X-coordinate": "282089", "Y-coordinate": "631116", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000737", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/02/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.559423", "long": "-3.870987", "status": "planning", "mw": 20, "ext_id": "7572"}, "current_month": "2024-01", "dates": {"first_heard": "2020-03-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2020-02-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hagshaw Hill", "name_short": "Hagshaw Hill", "owner": "Scottish Power Renewables", "state": "scotland", "country": "uk", "lat": "55.559423", "long": "-3.870987", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.559423+-3.870987", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bradford West Substation (Harrop Edge Farm Resubmission)", "city": "", "id": "397", "external_id": "7577", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "397", "external_id": "7577", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bradford West Substation (Harrop Edge Farm)", "external_id": "7577", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "construction", "date_first_heard": "2019-03-18", "start_construction": "2022-07-07", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.8095", "long": "-1.86127", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7577", "Record Last Updated (dd/mm/yyyy)": "15/11/2019", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Bradford West Substation (Harrop Edge Farm Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford West Yorkshire", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "", "X-coordinate": "409233", "Y-coordinate": "434810", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": " 18/03894/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/09/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/03/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/03/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.8095", "long": "-1.86127", "status": "planning", "mw": 49, "ext_id": "7577"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/11/2019", "to": "08/03/2022", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford West Yorkshire", "to": "Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford ", "extra": "", "change_type": "misc"}, {"name": "Post Code", "from": "", "to": "BD15 9AG", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/03/2022", "to": "08/07/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Bradford West Substation (Harrop Edge Farm Resubmission)", "to": "Bradford West Substation (Harrop Edge Farm)", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/03/2022", "to": "07/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/07/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "08/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7577", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Bradford West Substation (Harrop Edge Farm)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7045", "Address": "Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD15 9AG", "X-coordinate": "409233", "Y-coordinate": "434810", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": " 18/03894/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/09/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/03/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/03/2022", "Under Construction": "07/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "53.8095", "long": "-1.86127", "status": "construction", "mw": 49, "ext_id": "7577"}, "current_month": "2024-01", "dates": {"first_heard": "2019-11-15", "start_construction": "2022-07-08", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-03-18", "start_construction": "2022-07-07", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bradford West Substation (Harrop Edge Farm)", "name_short": "Bradford West Substation (Harrop Ed...", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.8095", "long": "-1.86127", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.8095+-1.86127", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crown Farm", "city": "", "id": "399", "external_id": "7606", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "399", "external_id": "7606", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lapwing Fen II, Crown Farm", "external_id": "7606", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Private Developer", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.723316", "long": "0.171334", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7606", "Record Last Updated (dd/mm/yyyy)": "07/09/2020", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Crown Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Crown Farm, Mill Road, West Walton, Wisbech, Cambridgeshire", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7EU", "X-coordinate": "546741", "Y-coordinate": "316174", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02002/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.723316", "long": "0.171334", "status": "planning", "mw": 49, "ext_id": "7606"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Crown Farm, Mill Road, West Walton, Wisbech, Cambridgeshire", "to": "Crown Farm, Mill Road, West Walton, Wisbech, ", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Norfolk", "to": "Cambridgeshire", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/09/2020", "to": "15/09/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Crown Farm", "to": "Lapwing Fen II, Crown Farm", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2022", "to": "22/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Operator (or Applicant)", "from": "Tribus Clean Energy", "to": "Private Developer", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7606", "Record Last Updated (dd/mm/yyyy)": "22/11/2022", "Operator (or Applicant)": "Private Developer", "Site Name": "Lapwing Fen II, Crown Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Crown Farm, Mill Road, West Walton, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7EU", "X-coordinate": "546741", "Y-coordinate": "316174", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02002/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.723316", "long": "0.171334", "status": "planning", "mw": 49, "ext_id": "7606"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lapwing Fen II, Crown Farm", "name_short": "Lapwing Fen II, Crown Farm", "owner": "Private Developer", "state": "eastern", "country": "uk", "lat": "52.723316", "long": "0.171334", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.723316+0.171334", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gipsy Lane", "city": "", "id": "400", "external_id": "7632", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-03-20", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "400", "external_id": "7632", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gipsy Lane", "external_id": "7632", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Arlington Energy", "status": "construction", "date_first_heard": "2020-03-20", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.597651", "long": "-2.178606", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7632", "Record Last Updated (dd/mm/yyyy)": "05/08/2021", "Operator (or Applicant)": "Arlington Energy", "Site Name": "Gipsy Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale,", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "OL11 3HF", "X-coordinate": "388277", "Y-coordinate": "411246", "Planning Authority": "Rochdale Borough Council", "Planning Application Reference": "19/01147/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/03/2023", "Under Construction": "01/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.597651", "long": "-2.178606", "status": "construction", "mw": 20, "ext_id": "7632"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/08/2021", "to": "12/01/2022", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale,", "to": "Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Planning Authority", "from": "Rochdale Borough Council", "to": "Rochdale Metropolitan Borough Council", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2022", "to": "01/07/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7632", "Record Last Updated (dd/mm/yyyy)": "01/07/2021", "Operator (or Applicant)": "Arlington Energy", "Site Name": "Gipsy Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "OL11 3HF", "X-coordinate": "388277", "Y-coordinate": "411246", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "19/01147/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/03/2023", "Under Construction": "01/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.597651", "long": "-2.178606", "status": "construction", "mw": 20, "ext_id": "7632"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-03-20", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Gipsy Lane", "name_short": "Gipsy Lane", "owner": "Arlington Energy", "state": "north west", "country": "uk", "lat": "53.597651", "long": "-2.178606", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.597651+-2.178606", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Model Farm", "city": "", "id": "401", "external_id": "7609", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "401", "external_id": "7609", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Model Farm", "external_id": "7609", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Tribus Clean Energy", "status": "planning", "date_first_heard": "2020-03-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.728144", "long": "0.195226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7609", "Record Last Updated (dd/mm/yyyy)": "13/09/2021", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Model Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, Cambridgeshire", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JF", "X-coordinate": "548338", "Y-coordinate": "316760", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "21/01715/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.728144", "long": "0.195226", "status": "planning", "mw": 49, "ext_id": "7609"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/09/2021", "to": "24/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, Cambridgeshire", "to": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, ", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Norfolk", "to": "Cambridgeshire", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/01715/FM", "to": "19/02003/F", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "31/08/2021", "to": "20/11/2019", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/03/2020", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7609", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Model Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10687", "Are they re-applying (Old REPD Ref) ": "", "Address": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JF", "X-coordinate": "548338", "Y-coordinate": "316760", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02003/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.728144", "long": "0.195226", "status": "planning", "mw": 49, "ext_id": "7609"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-03-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Model Farm", "name_short": "Model Farm", "owner": "Tribus Clean Energy", "state": "eastern", "country": "uk", "lat": "52.728144", "long": "0.195226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.728144+0.195226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Flower Farm", "city": "", "id": "402", "external_id": "7614", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "402", "external_id": "7614", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lapwing Fen 2 - Battery Storage Plant", "external_id": "7614", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 250, "power_mw": 250, "owner": "Tribus Clean Energy", "status": "construction", "date_first_heard": "2020-03-19", "start_construction": "2022-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.728614", "long": "0.172175", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7614", "Record Last Updated (dd/mm/yyyy)": "07/09/2020", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Flower Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, Cambridgeshire", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JG", "X-coordinate": "546780", "Y-coordinate": "316765", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02004/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.728614", "long": "0.172175", "status": "planning", "mw": 49, "ext_id": "7614"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/09/2020", "to": "21/02/2022", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, Cambridgeshire", "to": "Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, ", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Norfolk", "to": "Cambridgeshire", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/02/2022", "to": "08/06/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Flower Farm", "to": "Lapwing Fen 2 - Battery Storage Plant", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "49.90", "to": "250", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 49, "to": 250, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7614", "Record Last Updated (dd/mm/yyyy)": "08/06/2022", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Lapwing Fen 2 - Battery Storage Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "250", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JG", "X-coordinate": "546780", "Y-coordinate": "316765", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02004/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/03/2023", "Under Construction": "01/06/2022", "Operational": "", "Heat Network Ref": "", "lat": "52.728614", "long": "0.172175", "status": "construction", "mw": 250, "ext_id": "7614"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-07", "start_construction": "2022-06-08", "start_operation": ""}, "month_disappeared": ""}, "mw": 250, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-03-19", "start_construction": "2022-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lapwing Fen 2 - Battery Storage Plant", "name_short": "Lapwing Fen 2 - Battery Storage Pla...", "owner": "Tribus Clean Energy", "state": "eastern", "country": "uk", "lat": "52.728614", "long": "0.172175", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.728614+0.172175", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holes Bay", "city": "Poole", "id": "404", "external_id": "7688", "state": "dorset", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 17", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "404", "external_id": "7688", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holes Bay", "external_id": "7688", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Harmony Energy", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.726324", "long": "-1.990215", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7688", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Holes Bay", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land at Sterte Avenue West, Poole", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH15 2AL", "X-coordinate": "400787", "Y-coordinate": "91856", "Planning Authority": "Poole Borough Council", "Planning Application Reference": "APP/17/00186/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/02/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/01/2023", "Under Construction": "01/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "50.726324", "long": "-1.990215", "status": "construction", "mw": 15, "ext_id": "7688"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "14/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7688", "Record Last Updated (dd/mm/yyyy)": "14/01/2020", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Holes Bay", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Sterte Avenue West, Poole", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH15 2AL", "X-coordinate": "400787", "Y-coordinate": "91856", "Planning Authority": "Poole Borough Council", "Planning Application Reference": "APP/17/00186/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/02/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/01/2023", "Under Construction": "01/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "50.726324", "long": "-1.990215", "status": "construction", "mw": 15, "ext_id": "7688"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holes Bay", "name_short": "Holes Bay", "owner": "Harmony Energy", "state": "south west", "country": "uk", "lat": "50.726324", "long": "-1.990215", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.726324+-1.990215", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 17"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "East Ballochy", "city": "", "id": "406", "external_id": "7675", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "406", "external_id": "7675", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Ballochy", "external_id": "7675", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2020-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.746891", "long": "-2.540601", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7675", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "East Ballochy", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7674", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Field 400M SE Of East Ballochy, East Ballochy, Montrose, Tayside", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD10 9LP", "X-coordinate": "367035", "Y-coordinate": "761826", "Planning Authority": "Angus Council", "Planning Application Reference": "20/00019/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/09/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/09/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.746891", "long": "-2.540601", "status": "planning", "mw": 10, "ext_id": "7675"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "15/09/2020", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7675", "Record Last Updated (dd/mm/yyyy)": "15/09/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "East Ballochy", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7674", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "1882", "Address": "Field 400M SE Of East Ballochy, East Ballochy, Montrose, Tayside", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD10 9LP", "X-coordinate": "367035", "Y-coordinate": "761826", "Planning Authority": "Angus Council", "Planning Application Reference": "20/00019/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/09/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/09/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.746891", "long": "-2.540601", "status": "planning", "mw": 10, "ext_id": "7675"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2020-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Ballochy", "name_short": "East Ballochy", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "56.746891", "long": "-2.540601", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.746891+-2.540601", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thurrock Flexible Generation Plant", "city": "", "id": "407", "external_id": "7696", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "RPS Group / Thurrock Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "407", "external_id": "7696", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Thurrock Flexible Generation Plant", "external_id": "7696", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "Thurrock Power", "status": "planning", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.457726", "long": "0.383815", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7696", "Record Last Updated (dd/mm/yyyy)": "06/07/2020", "Operator (or Applicant)": "RPS Group / Thurrock Power", "Site Name": "Thurrock Flexible Generation Plant", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Thurrock Flexible Generation Plant Fort Road Tilbury Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "RM18 8UJ", "X-coordinate": "565711", "Y-coordinate": "175889", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010092", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/06/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.457726", "long": "0.383815", "status": "planning", "mw": 150, "ext_id": "7696"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/07/2020", "to": "26/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "RPS Group / Thurrock Power", "to": "Thurrock Power", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Thurrock Flexible Generation Plant Fort Road Tilbury Essex", "to": "Thurrock Flexible Generation Plant Fort Road Tilbury", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "16/02/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/05/2022", "to": "04/10/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7696", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Thurrock Power", "Site Name": "Thurrock Flexible Generation Plant", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thurrock Flexible Generation Plant Fort Road Tilbury", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "RM18 8UJ", "X-coordinate": "565711", "Y-coordinate": "175889", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010092", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/06/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/02/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.457726", "long": "0.383815", "status": "planning", "mw": 150, "ext_id": "7696"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Thurrock Flexible Generation Plant", "name_short": "Thurrock Flexible Generation Plant", "owner": "Thurrock Power", "state": "eastern", "country": "uk", "lat": "51.457726", "long": "0.383815", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.457726+0.383815", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Basing Road", "city": "", "id": "411", "external_id": "7746", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Eco-Economix", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "411", "external_id": "7746", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Basing Road", "external_id": "7746", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Eco-Economix", "status": "planning", "date_first_heard": "2021-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.268813", "long": "-1.062084", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7746", "Record Last Updated (dd/mm/yyyy)": "15/09/2021", "Operator (or Applicant)": "Eco-Economix", "Site Name": "Basing Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land At, Basing Road, Old Basing, Basingstoke, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG24 7AL", "X-coordinate": "465530", "Y-coordinate": "152602", "Planning Authority": "Basingstoke and Deane Borough Council", "Planning Application Reference": "21/02412/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.268813", "long": "-1.062084", "status": "planning", "mw": 20, "ext_id": "7746"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Land At, Basing Road, Old Basing, Basingstoke, Hampshire", "to": "Land At, Basing Road, Old Basing, Basingstoke, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Basingstoke and Deane Borough Council", "to": "Basingstoke & Deane Borough Council", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2021", "to": "24/02/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7746", "Record Last Updated (dd/mm/yyyy)": "24/02/2023", "Operator (or Applicant)": "Eco-Economix", "Site Name": "Basing Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At, Basing Road, Old Basing, Basingstoke, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG24 7AL", "X-coordinate": "465530", "Y-coordinate": "152602", "Planning Authority": "Basingstoke & Deane Borough Council", "Planning Application Reference": "21/02412/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.268813", "long": "-1.062084", "status": "planning", "mw": 20, "ext_id": "7746"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Basing Road", "name_short": "Basing Road", "owner": "Eco-Economix", "state": "south east", "country": "uk", "lat": "51.268813", "long": "-1.062084", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.268813+-1.062084", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordtown Energy Storage (Resubmission)", "city": "", "id": "413", "external_id": "7764", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Intelligent Land Investments (ILI)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "413", "external_id": "7764", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordtown Energy Storage ", "external_id": "7764", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 29, "power_mw": 29, "owner": "Intelligent Land Investments (ILI)", "status": "planning", "date_first_heard": "2020-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7764", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Intelligent Land Investments (ILI)", "Site Name": "Fordtown Energy Storage (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "ENQ/2020/0261", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/02/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 29, "ext_id": "7764"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Fordtown, Kintore, Inverurie, Grampian", "to": "Fordtown, Kintore, Inverurie", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Site Name", "from": "Fordtown Energy Storage (Resubmission)", "to": "Fordtown Energy Storage ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "17/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7764", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Intelligent Land Investments (ILI)", "Site Name": "Fordtown Energy Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10239", "Are they re-applying (Old REPD Ref) ": "7234", "Address": "Fordtown, Kintore, Inverurie", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "ENQ/2020/0261", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/02/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 29, "ext_id": "7764"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 29, "mwh_is_estimate": true, "mwh": 29, "mwh_estimate": 29, "status": "planning", "status_class": "", "date_first_heard": "2020-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordtown Energy Storage ", "name_short": "Fordtown Energy Storage ", "owner": "Intelligent Land Investments (ILI)", "state": "scotland", "country": "uk", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.221396+-2.366114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newton Wood Farm", "city": "", "id": "415", "external_id": "7780", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "415", "external_id": "7780", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newton Wood Farm", "external_id": "7780", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco", "status": "planning", "date_first_heard": "2020-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.139091", "long": "-1.321937", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7780", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Newton Wood Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Newton Wood Farm, Newtonwood Lane, Newton, Alfreton, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE55 5SG", "X-coordinate": "445457", "Y-coordinate": "360430", "Planning Authority": "Bolsover District Council", "Planning Application Reference": "20/00202/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.139091", "long": "-1.321937", "status": "planning", "mw": 49, "ext_id": "7780"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/10/2023", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "22/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7780", "Record Last Updated (dd/mm/yyyy)": "22/03/2022", "Operator (or Applicant)": "Anesco", "Site Name": "Newton Wood Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newton Wood Farm, Newtonwood Lane, Newton, Alfreton, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE55 5SG", "X-coordinate": "445457", "Y-coordinate": "360430", "Planning Authority": "Bolsover District Council", "Planning Application Reference": "20/00202/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.139091", "long": "-1.321937", "status": "planning", "mw": 49, "ext_id": "7780"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newton Wood Farm", "name_short": "Newton Wood Farm", "owner": "Anesco", "state": "east midlands", "country": "uk", "lat": "53.139091", "long": "-1.321937", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.139091+-1.321937", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hawthorne Road", "city": "", "id": "416", "external_id": "7800", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Shaw Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "416", "external_id": "7800", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hawthorne Road", "external_id": "7800", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Bluefield Renewable Developments", "status": "construction", "date_first_heard": "2020-04-14", "start_construction": "2023-02-17", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.459236", "long": "-2.986359", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7800", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Shaw Energy", "Site Name": "Hawthorne Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "491 Linacre Lane, Bootle, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L20 5AL", "X-coordinate": "334606", "Y-coordinate": "396285", "Planning Authority": "Sefton Council", "Planning Application Reference": "DC/2020/00085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/04/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.459236", "long": "-2.986359", "status": "planning", "mw": 40, "ext_id": "7800"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "19/04/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Shaw Energy", "to": "Bluefield Renewable Developments", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "40", "to": "20", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "17/02/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 40, "to": 20, "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2023", "to": "30/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7800", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Bluefield Renewable Developments", "Site Name": "Hawthorne Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "491 Linacre Lane, Bootle, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L20 5AL", "X-coordinate": "334606", "Y-coordinate": "396285", "Planning Authority": "Sefton Council", "Planning Application Reference": "DC/2020/00085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/04/2023", "Under Construction": "17/02/2023", "Operational": "", "Heat Network Ref": "", "lat": "53.459236", "long": "-2.986359", "status": "construction", "mw": 20, "ext_id": "7800"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "2023-04-19", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-04-14", "start_construction": "2023-02-17", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hawthorne Road", "name_short": "Hawthorne Road", "owner": "Bluefield Renewable Developments", "state": "north west", "country": "uk", "lat": "53.459236", "long": "-2.986359", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.459236+-2.986359", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Titchfield Lane", "city": "", "id": "420", "external_id": "7828", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Balanced Grid Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "420", "external_id": "7828", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Titchfield Lane", "external_id": "7828", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Balanced Grid Solutions", "status": "construction", "date_first_heard": "2020-08-20", "start_construction": "2023-08-20", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.883281", "long": "-1.215524", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7828", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Balanced Grid Solutions", "Site Name": "Titchfield Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land South Of Ash Farm, Titchfield Lane, Wickham, Fareham, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO15 6DY", "X-coordinate": "455282", "Y-coordinate": "109603", "Planning Authority": "Winchester City Council", "Planning Application Reference": "19/02710/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/08/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/08/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.883281", "long": "-1.215524", "status": "planning", "mw": 49, "ext_id": "7828"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "20/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "20/08/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7828", "Record Last Updated (dd/mm/yyyy)": "20/08/2023", "Operator (or Applicant)": "Balanced Grid Solutions", "Site Name": "Titchfield Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South Of Ash Farm, Titchfield Lane, Wickham, Fareham, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO15 6DY", "X-coordinate": "455282", "Y-coordinate": "109603", "Planning Authority": "Winchester City Council", "Planning Application Reference": "19/02710/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/08/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/08/2023", "Under Construction": "20/08/2023", "Operational": "", "Heat Network Ref": "", "lat": "50.883281", "long": "-1.215524", "status": "construction", "mw": 49, "ext_id": "7828"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "2023-08-20", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-08-20", "start_construction": "2023-08-20", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Titchfield Lane", "name_short": "Titchfield Lane", "owner": "Balanced Grid Solutions", "state": "south east", "country": "uk", "lat": "50.883281", "long": "-1.215524", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.883281+-1.215524", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cleve Hill Solar Project", "city": "", "id": "421", "external_id": "7856", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "421", "external_id": "7856", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cleve Hill Solar Project", "external_id": "7856", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "status": "construction", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.338767", "long": "0.913885", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7856", "Record Last Updated (dd/mm/yyyy)": "02/05/2023", "Operator (or Applicant)": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "Site Name": "Cleve Hill Solar Project", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6502", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Graveney, Whitstable", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME13 9EE", "X-coordinate": "603057", "Y-coordinate": "163995", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/06/2025", "Under Construction": "01/11/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.338767", "long": "0.913885", "status": "construction", "mw": 150, "ext_id": "7856"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/05/2023", "to": "09/06/2022", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/11/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7856", "Record Last Updated (dd/mm/yyyy)": "09/06/2022", "Operator (or Applicant)": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "Site Name": "Cleve Hill Solar Project", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6502", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Graveney, Whitstable", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME13 9EE", "X-coordinate": "603057", "Y-coordinate": "163995", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.338767", "long": "0.913885", "status": "construction", "mw": 150, "ext_id": "7856"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cleve Hill Solar Project", "name_short": "Cleve Hill Solar", "owner": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "state": "south east", "country": "uk", "lat": "51.338767", "long": "0.913885", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.338767+0.913885", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arecleoch Wind Farm (extension)", "city": "", "id": "422", "external_id": "7882", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "422", "external_id": "7882", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Arecleoch Wind Farm (extension)", "external_id": "7882", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.068785", "long": "-4.797054", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7882", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Arecleoch Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7881", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land 2km south west of Barrhill, South Ayrshire", "County": "South Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26 0PP", "X-coordinate": "221500", "Y-coordinate": "578500", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001864", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.068785", "long": "-4.797054", "status": "planning", "mw": 20, "ext_id": "7882"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2020", "to": "18/11/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/11/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "16/11/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/11/2021", "to": "20/02/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7882", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Arecleoch Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7881", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 2km south west of Barrhill, South Ayrshire", "County": "South Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26 0PP", "X-coordinate": "221500", "Y-coordinate": "578500", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001864", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/11/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.068785", "long": "-4.797054", "status": "planning", "mw": 20, "ext_id": "7882"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Arecleoch Wind Farm (extension)", "name_short": "Arecleoch Wind Farm (extension)", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "55.068785", "long": "-4.797054", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.068785+-4.797054", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coventry National Grid Substation", "city": "", "id": "423", "external_id": "7885", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "423", "external_id": "7885", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coventry National Grid Substation", "external_id": "7885", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "construction", "date_first_heard": "2021-01-22", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.454379", "long": "-1.464323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7885", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Pivot Power", "Site Name": "Coventry National Grid Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "National Grid Substation, Parrotts Grove, Coventry, West Midlands", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV2 1NQ", "X-coordinate": "436499", "Y-coordinate": "284182", "Planning Authority": "Coventry City Council", "Planning Application Reference": "FUL/2020/1476", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.454379", "long": "-1.464323", "status": "planning", "mw": 49, "ext_id": "7885"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "11/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2022", "to": "25/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7885", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Coventry National Grid Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Substation, Parrotts Grove, Coventry, West Midlands", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV2 1NQ", "X-coordinate": "436499", "Y-coordinate": "284182", "Planning Authority": "Coventry City Council", "Planning Application Reference": "FUL/2020/1476", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/01/2024", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "52.454379", "long": "-1.464323", "status": "construction", "mw": 49, "ext_id": "7885"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "2022-11-11", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-01-22", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coventry National Grid Substation", "name_short": "Coventry National Grid Substation", "owner": "Pivot Power", "state": "west midlands", "country": "uk", "lat": "52.454379", "long": "-1.464323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.454379+-1.464323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Reach Road", "city": "", "id": "425", "external_id": "7906", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Power Networks", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "425", "external_id": "7906", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Reach Road", "external_id": "7906", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Power Networks", "status": "planning", "date_first_heard": "2020-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.269787", "long": "0.318918", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7906", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "UK Power Networks", "Site Name": "Reach Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Armtrac, 70 Reach Road, Burwell, Cambridge, Cambridgeshire", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0AH", "X-coordinate": "558327", "Y-coordinate": "266047", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "20/00655/SON", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/07/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.269787", "long": "0.318918", "status": "planning", "mw": 49, "ext_id": "7906"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Storage Co-location REPD Ref ID", "from": "", "to": "NA", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "PANR", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7906", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "UK Power Networks", "Site Name": "Reach Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "NA", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Armtrac, 70 Reach Road, Burwell, Cambridge, Cambridgeshire", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0AH", "X-coordinate": "558327", "Y-coordinate": "266047", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "20/00655/SON", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/07/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PANR", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.269787", "long": "0.318918", "status": "planning", "mw": 49, "ext_id": "7906"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Reach Road", "name_short": "Reach Road", "owner": "UK Power Networks", "state": "eastern", "country": "uk", "lat": "52.269787", "long": "0.318918", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.269787+0.318918", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Minety Substation", "city": "", "id": "427", "external_id": "7942", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Project", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "427", "external_id": "7942", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Minety Substation", "external_id": "7942", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "JBM Solar Project", "status": "planning", "date_first_heard": "2022-04-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.601478", "long": "-2.007388", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7942", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "JBM Solar Project", "Site Name": "Minety Substation", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7941", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land Near Minety Substation, Stonehill, Charlton, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "399585", "Y-coordinate": "189182", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "20/03528/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.601478", "long": "-2.007388", "status": "planning", "mw": 49, "ext_id": "7942"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "27/04/2022", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "49.90", "to": "10", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Near Minety Substation, Stonehill, Charlton, Malmesbury, Wiltshire", "to": "Land Near Minety Substation, Stonehill, Charlton, Malmesbury, ", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "07/04/2022", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 49, "to": 10, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "07/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7942", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "JBM Solar Project", "Site Name": "Minety Substation", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7941", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Near Minety Substation, Stonehill, Charlton, Malmesbury, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "399585", "Y-coordinate": "189182", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "20/03528/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.601478", "long": "-2.007388", "status": "planning", "mw": 10, "ext_id": "7942"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2022-04-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Minety Substation", "name_short": "Minety Substation", "owner": "JBM Solar Project", "state": "south west", "country": "uk", "lat": "51.601478", "long": "-2.007388", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.601478+-2.007388", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Unit 5 XL Business Park", "city": "", "id": "428", "external_id": "7985", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Amber Infrastructure Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-18", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "428", "external_id": "7985", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Unit 5 XL Business Park", "external_id": "7985", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Amber Infrastructure Group", "status": "construction", "date_first_heard": "2017-12-18", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.562191", "long": "-2.806931", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7985", "Record Last Updated (dd/mm/yyyy)": "30/07/2021", "Operator (or Applicant)": "Amber Infrastructure Group", "Site Name": "Unit 5 XL Business Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Unit 5, X L Business Park, Statham Road, Skelmersdale, Lancashire", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "WN8 8DY", "X-coordinate": "346649", "Y-coordinate": "407589", "Planning Authority": "West Lancashire Borough Council", "Planning Application Reference": "2017/0968/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/12/2020", "Under Construction": "01/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.562191", "long": "-2.806931", "status": "construction", "mw": 49, "ext_id": "7985"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/07/2021", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7985", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Amber Infrastructure Group", "Site Name": "Unit 5 XL Business Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Unit 5, X L Business Park, Statham Road, Skelmersdale, Lancashire", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "WN8 8DY", "X-coordinate": "346649", "Y-coordinate": "407589", "Planning Authority": "West Lancashire Borough Council", "Planning Application Reference": "2017/0968/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/12/2020", "Under Construction": "01/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.562191", "long": "-2.806931", "status": "construction", "mw": 49, "ext_id": "7985"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-12-18", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Unit 5 XL Business Park", "name_short": "Unit 5 XL Business Park", "owner": "Amber Infrastructure Group", "state": "north west", "country": "uk", "lat": "53.562191", "long": "-2.806931", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.562191+-2.806931", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Perserverance Road (Resubmission)", "city": "", "id": "429", "external_id": "7966", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "429", "external_id": "7966", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Perserverance Road ", "external_id": "7966", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Noriker Power", "status": "planning", "date_first_heard": "2020-11-13", "start_construction": "2022-06-16", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.070788", "long": "-2.714505", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7966", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Noriker Power", "Site Name": "Perserverance Road (Resubmission)", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "Yes", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Old School Lane, Hereford, Hereford and Worcester", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR4 9BP", "X-coordinate": "351122", "Y-coordinate": "241621", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P200967/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/11/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/11/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.070788", "long": "-2.714505", "status": "planning", "mw": 20, "ext_id": "7966"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "16/06/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Perserverance Road (Resubmission)", "to": "Perserverance Road ", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Co-located with fossil fuel plant", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "Yes", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Old School Lane, Hereford, Hereford and Worcester", "to": "Old School Lane, Hereford, ", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/06/2022", "to": "12/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/06/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/10/2022", "to": "22/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7966", "Record Last Updated (dd/mm/yyyy)": "22/03/2023", "Operator (or Applicant)": "Noriker Power", "Site Name": "Perserverance Road ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7061", "Address": "Old School Lane, Hereford, ", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR4 9BP", "X-coordinate": "351122", "Y-coordinate": "241621", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P200967/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/11/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/11/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.070788", "long": "-2.714505", "status": "planning", "mw": 20, "ext_id": "7966"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "2022-06-16", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2020-11-13", "start_construction": "2022-06-16", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Perserverance Road ", "name_short": "Perserverance Road ", "owner": "Noriker Power", "state": "west midlands", "country": "uk", "lat": "52.070788", "long": "-2.714505", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.070788+-2.714505", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Learielaw Farm", "city": "", "id": "430", "external_id": "7970", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Intelligent Land Investments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "430", "external_id": "7970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Learielaw Farm", "external_id": "7970", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 29, "power_mw": 29, "owner": "Intelligent Land Investments", "status": "planning", "date_first_heard": "2020-10-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.922188", "long": "-3.469178", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7970", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Intelligent Land Investments", "Site Name": "Learielaw Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Learielaw Farm, Broxburn, Lothian", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH52 5PG", "X-coordinate": "308286", "Y-coordinate": "670876", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0600/FUL/20", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.922188", "long": "-3.469178", "status": "planning", "mw": 29, "ext_id": "7970"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "21/06/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/06/2022", "to": "06/03/2023", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/03/2023", "to": "16/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "13368", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7970", "Record Last Updated (dd/mm/yyyy)": "16/11/2022", "Operator (or Applicant)": "Intelligent Land Investments", "Site Name": "Learielaw Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13368", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Learielaw Farm, Broxburn, Lothian", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH52 5PG", "X-coordinate": "308286", "Y-coordinate": "670876", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0600/FUL/20", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.922188", "long": "-3.469178", "status": "planning", "mw": 29, "ext_id": "7970"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 29, "mwh_is_estimate": true, "mwh": 29, "mwh_estimate": 29, "status": "planning", "status_class": "", "date_first_heard": "2020-10-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Learielaw Farm", "name_short": "Learielaw Farm", "owner": "Intelligent Land Investments", "state": "scotland", "country": "uk", "lat": "55.922188", "long": "-3.469178", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.922188+-3.469178", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitehouse Farm Energy Barn", "city": "", "id": "434", "external_id": "7987", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Hedge", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "434", "external_id": "7987", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitehouse Farm Energy Barn", "external_id": "7987", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Bluefield Solar Income Fund", "status": "planning", "date_first_heard": "2017-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.108888", "long": "-2.260957", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7987", "Record Last Updated (dd/mm/yyyy)": "25/08/2020", "Operator (or Applicant)": "Green Hedge", "Site Name": "Whitehouse Farm Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Whitehouse Farm, Blakes Lane, Guarlford, Malvern, Hereford and Worcester", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "WR13 6NZ", "X-coordinate": "382225", "Y-coordinate": "245650", "Planning Authority": "Malvern Hills District Council", "Planning Application Reference": "17/01504/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/11/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.108888", "long": "-2.260957", "status": "planning", "mw": 40, "ext_id": "7987"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/08/2020", "to": "27/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Green Hedge", "to": "Bluefield Solar Income Fund", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Whitehouse Farm, Blakes Lane, Guarlford, Malvern, Hereford and Worcester", "to": "Whitehouse Farm, Blakes Lane, Guarlford, Malvern,", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "29/11/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2022", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7987", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Bluefield Solar Income Fund", "Site Name": "Whitehouse Farm Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Whitehouse Farm, Blakes Lane, Guarlford, Malvern,", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "WR13 6NZ", "X-coordinate": "382225", "Y-coordinate": "245650", "Planning Authority": "Malvern Hills District Council", "Planning Application Reference": "17/01504/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.108888", "long": "-2.260957", "status": "planning", "mw": 40, "ext_id": "7987"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2017-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whitehouse Farm Energy Barn", "name_short": "Whitehouse Farm Energy Barn", "owner": "Bluefield Solar Income Fund", "state": "west midlands", "country": "uk", "lat": "52.108888", "long": "-2.260957", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.108888+-2.260957", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Catsbrain Farm", "city": "", "id": "435", "external_id": "7988", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Hedge", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "435", "external_id": "7988", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Catsbrain Farm", "external_id": "7988", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Green Hedge", "status": "planning", "date_first_heard": "2017-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.600752", "long": "-1.748629", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7988", "Record Last Updated (dd/mm/yyyy)": "25/08/2020", "Operator (or Applicant)": "Green Hedge", "Site Name": "Catsbrain Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN3", "X-coordinate": "417507", "Y-coordinate": "189131", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/17/0979", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/06/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/11/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.600752", "long": "-1.748629", "status": "planning", "mw": 30, "ext_id": "7988"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/08/2020", "to": "04/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "11787", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, Wiltshire", "to": "N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, ", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/08/2022", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7988", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Green Hedge", "Site Name": "Catsbrain Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11787", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN3", "X-coordinate": "417507", "Y-coordinate": "189131", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/17/0979", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/06/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/11/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.600752", "long": "-1.748629", "status": "planning", "mw": 30, "ext_id": "7988"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2017-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Catsbrain Farm", "name_short": "Catsbrain Farm", "owner": "Green Hedge", "state": "south west", "country": "uk", "lat": "51.600752", "long": "-1.748629", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.600752+-1.748629", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Roaring Hill (Resubmission)", "city": "", "id": "436", "external_id": "7989", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "436", "external_id": "7989", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Roaring Hill (Resubmission)", "external_id": "7989", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Renewable Energy Systems (RES)", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.207428", "long": "-3.203344", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7989", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Roaring Hill (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9224", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To East Of Balsillie Avenue And To The South Of The Limekilns Glenrothes", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "325451", "Y-coordinate": "702300", "Planning Authority": "Fife Council", "Planning Application Reference": "17/03318/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.207428", "long": "-3.203344", "status": "planning", "mw": 30, "ext_id": "7989"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "24/01/2023", "extra": "", "change_type": "misc"}, {"name": "Post Code", "from": "", "to": "KY6 3ET", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7989", "Record Last Updated (dd/mm/yyyy)": "24/01/2023", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Roaring Hill (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9224", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To East Of Balsillie Avenue And To The South Of The Limekilns Glenrothes", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY6 3ET", "X-coordinate": "325451", "Y-coordinate": "702300", "Planning Authority": "Fife Council", "Planning Application Reference": "17/03318/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.207428", "long": "-3.203344", "status": "planning", "mw": 30, "ext_id": "7989"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Roaring Hill (Resubmission)", "name_short": "Roaring Hill (Resubmission)", "owner": "Renewable Energy Systems (RES)", "state": "scotland", "country": "uk", "lat": "56.207428", "long": "-3.203344", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.207428+-3.203344", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mill Hill National Grid Substation", "city": "", "id": "437", "external_id": "8009", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "437", "external_id": "8009", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mill Hill National Grid Substation", "external_id": "8009", "state": "london", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harbour Energy", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.617628", "long": "-0.211422", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8009", "Record Last Updated (dd/mm/yyyy)": "21/03/2023", "Operator (or Applicant)": "Harbour Energy", "Site Name": "Mill Hill National Grid Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Mill Hill Substa, Partingdale Lane, Barnet, ", "County": "London", "Region": "London", "Country": "England", "Post Code": "NW7 1NT", "X-coordinate": "523926", "Y-coordinate": "192493", "Planning Authority": "London Borough of Barnet", "Planning Application Reference": "20/4241/FUL", "Appeal Reference": "22/00221/AREF", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "07/04/2022", "Appeal Lodged": "08/08/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "13/03/2023", "Planning Permission Granted": "13/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.617628", "long": "-0.211422", "status": "planning", "mw": 49, "ext_id": "8009"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/03/2023", "to": "27/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8009", "Record Last Updated (dd/mm/yyyy)": "27/03/2023", "Operator (or Applicant)": "Harbour Energy", "Site Name": "Mill Hill National Grid Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Mill Hill Substa, Partingdale Lane, Barnet, ", "County": "London", "Region": "London", "Country": "England", "Post Code": "NW7 1NT", "X-coordinate": "523926", "Y-coordinate": "192493", "Planning Authority": "London Borough of Barnet", "Planning Application Reference": "20/4241/FUL", "Appeal Reference": "22/00221/AREF", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "07/04/2022", "Appeal Lodged": "08/08/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "13/03/2023", "Planning Permission Granted": "13/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.617628", "long": "-0.211422", "status": "planning", "mw": 49, "ext_id": "8009"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mill Hill National Grid Substation", "name_short": "Mill Hill National Grid Substation", "owner": "Harbour Energy", "state": "london", "country": "uk", "lat": "51.617628", "long": "-0.211422", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.617628+-0.211422", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grid Minety Substation", "city": "", "id": "438", "external_id": "8021", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "438", "external_id": "8021", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grid Minety Substation", "external_id": "8021", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harbour Energy", "status": "planning", "date_first_heard": "2021-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.606846", "long": "-1.999013", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8021", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Minety Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "National Grid Minety Substatio, Stonehill, Charlton, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "400165", "Y-coordinate": "189779", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "20/07390/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.606846", "long": "-1.999013", "status": "planning", "mw": 49, "ext_id": "8021"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "22/12/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8021", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Minety Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Minety Substatio, Stonehill, Charlton, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "400165", "Y-coordinate": "189779", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "20/07390/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.606846", "long": "-1.999013", "status": "planning", "mw": 49, "ext_id": "8021"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "National Grid Minety Substation", "name_short": "National Grid Minety Substation", "owner": "Harbour Energy", "state": "south west", "country": "uk", "lat": "51.606846", "long": "-1.999013", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.606846+-1.999013", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Colinglen Road Battery", "city": "", "id": "439", "external_id": "8033", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Hannahstown BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "439", "external_id": "8033", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Colinglen Road Battery", "external_id": "8033", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Hannahstown BESS", "status": "planning", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.579463", "long": "-6.03982", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8033", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Hannahstown BESS", "Site Name": "Colinglen Road Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Approximately 700m North Of, 28 Colinglen Road, Dunmurry, Belfast, Co Antrim", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT17 0LR", "X-coordinate": "139044", "Y-coordinate": "527979", "Planning Authority": "Belfast City Council", "Planning Application Reference": "LA04/2020/1724/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.579463", "long": "-6.03982", "status": "planning", "mw": 49, "ext_id": "8033"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "15/08/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8033", "Record Last Updated (dd/mm/yyyy)": "15/08/2022", "Operator (or Applicant)": "Hannahstown BESS", "Site Name": "Colinglen Road Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Approximately 700m North Of, 28 Colinglen Road, Dunmurry, Belfast, Co Antrim", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT17 0LR", "X-coordinate": "139044", "Y-coordinate": "527979", "Planning Authority": "Belfast City Council", "Planning Application Reference": "LA04/2020/1724/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.579463", "long": "-6.03982", "status": "planning", "mw": 49, "ext_id": "8033"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Colinglen Road Battery", "name_short": "Colinglen Road Battery", "owner": "Hannahstown BESS", "state": "northern ireland", "country": "uk", "lat": "54.579463", "long": "-6.03982", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.579463+-6.03982", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grid Axminster Substation", "city": "", "id": "440", "external_id": "8036", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "440", "external_id": "8036", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grid Axminster Substation", "external_id": "8036", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harbour Energy", "status": "planning", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.785769", "long": "-2.924556", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8036", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Axminster Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "National Grid Axminster Substa, Pound Road, Hawkchurch, Axminster, Devon", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX13 5UJ", "X-coordinate": "334921", "Y-coordinate": "98874", "Planning Authority": "East Devon District Council", "Planning Application Reference": "20/1877/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.785769", "long": "-2.924556", "status": "planning", "mw": 49, "ext_id": "8036"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8036", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Axminster Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Axminster Substa, Pound Road, Hawkchurch, Axminster, Devon", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX13 5UJ", "X-coordinate": "334921", "Y-coordinate": "98874", "Planning Authority": "East Devon District Council", "Planning Application Reference": "20/1877/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.785769", "long": "-2.924556", "status": "planning", "mw": 49, "ext_id": "8036"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "National Grid Axminster Substation", "name_short": "National Grid Axminster Substation", "owner": "Harbour Energy", "state": "south west", "country": "uk", "lat": "50.785769", "long": "-2.924556", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.785769+-2.924556", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grid Enderby Substation", "city": "", "id": "441", "external_id": "8037", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "441", "external_id": "8037", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grid Enderby Substation", "external_id": "8037", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harbour Energy", "status": "construction", "date_first_heard": "2021-02-04", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.599334", "long": "-1.215904", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8037", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Enderby Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "National Grid Land To North Of, Desford Road, Enderby, Leicester, Leicestershire", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE19 4AD", "X-coordinate": "453205", "Y-coordinate": "300460", "Planning Authority": "Blaby District Council", "Planning Application Reference": "20/0896/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.599334", "long": "-1.215904", "status": "planning", "mw": 49, "ext_id": "8037"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "26/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/09/2022", "to": "25/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/01/2023", "to": "30/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8037", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Enderby Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Land To North Of, Desford Road, Enderby, Leicester, Leicestershire", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE19 4AD", "X-coordinate": "453205", "Y-coordinate": "300460", "Planning Authority": "Blaby District Council", "Planning Application Reference": "20/0896/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/02/2024", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "52.599334", "long": "-1.215904", "status": "construction", "mw": 49, "ext_id": "8037"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "2023-01-25", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-02-04", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "National Grid Enderby Substation", "name_short": "National Grid Enderby Substation", "owner": "Harbour Energy", "state": "east midlands", "country": "uk", "lat": "52.599334", "long": "-1.215904", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.599334+-1.215904", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Moston Vale", "city": "", "id": "442", "external_id": "8085", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Novus Renewable Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-11-24", "start_construction": "2021-07-31", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "442", "external_id": "8085", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Moston Vale", "external_id": "8085", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Novus Renewable Services", "status": "construction", "date_first_heard": "2020-11-24", "start_construction": "2021-07-31", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.505231", "long": "-2.207526", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8085", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "Novus Renewable Services", "Site Name": "Moston Vale", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land To The South West Of, Moston Vale, Manchester, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M40 9GJ", "X-coordinate": "386333", "Y-coordinate": "400969", "Planning Authority": "Manchester City Council", "Planning Application Reference": "127629/FO/2020", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/11/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/11/2023", "Under Construction": "31/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.505231", "long": "-2.207526", "status": "construction", "mw": 10, "ext_id": "8085"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2021", "to": "07/05/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8085", "Record Last Updated (dd/mm/yyyy)": "07/05/2021", "Operator (or Applicant)": "Novus Renewable Services", "Site Name": "Moston Vale", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South West Of, Moston Vale, Manchester, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M40 9GJ", "X-coordinate": "386333", "Y-coordinate": "400969", "Planning Authority": "Manchester City Council", "Planning Application Reference": "127629/FO/2020", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/11/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/11/2023", "Under Construction": "31/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.505231", "long": "-2.207526", "status": "construction", "mw": 10, "ext_id": "8085"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-11-24", "start_construction": "2021-07-31", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Moston Vale", "name_short": "Moston Vale", "owner": "Novus Renewable Services", "state": "north west", "country": "uk", "lat": "53.505231", "long": "-2.207526", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.505231+-2.207526", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Welkin Mill", "city": "", "id": "443", "external_id": "8055", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "443", "external_id": "8055", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Welkin Mill", "external_id": "8055", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Noriker Power", "status": "planning", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419541", "long": "-2.134538", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8055", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Noriker Power", "Site Name": "Welkin Mill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391156", "Y-coordinate": "391424", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/077298", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419541", "long": "-2.134538", "status": "planning", "mw": 49, "ext_id": "8055"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "05/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12982", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7832", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/01/2023", "to": "10/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8055", "Record Last Updated (dd/mm/yyyy)": "10/12/2021", "Operator (or Applicant)": "Noriker Power", "Site Name": "Welkin Mill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12982", "Are they re-applying (Old REPD Ref) ": "7832", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391156", "Y-coordinate": "391424", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/077298", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419541", "long": "-2.134538", "status": "planning", "mw": 49, "ext_id": "8055"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Welkin Mill", "name_short": "Welkin Mill", "owner": "Noriker Power", "state": "north west", "country": "uk", "lat": "53.419541", "long": "-2.134538", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419541+-2.134538", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Loudwater Battery Storage Site", "city": "", "id": "444", "external_id": "8142", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-05-24", "start_construction": "2021-06-10", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "444", "external_id": "8142", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Loudwater Battery Storage Site", "external_id": "8142", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Capbal", "status": "planning", "date_first_heard": "2019-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.611543", "long": "-0.690723", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8142", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Loudwater Battery Storage Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Derehams Farm, Derehams Lane, Loudwater, High Wycombe, Buckinghamshire", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490756", "Y-coordinate": "191113", "Planning Authority": "Wycombe District Council", "Planning Application Reference": "18/07600/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/05/2022", "Under Construction": "10/06/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.611543", "long": "-0.690723", "status": "construction", "mw": 40, "ext_id": "8142"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "30/06/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "10/06/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2021", "to": "12/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "11993", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "30/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8142", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Loudwater Battery Storage Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11993", "Are they re-applying (Old REPD Ref) ": "", "Address": "Derehams Farm, Derehams Lane, Loudwater, High Wycombe, Buckinghamshire", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490756", "Y-coordinate": "191113", "Planning Authority": "Wycombe District Council", "Planning Application Reference": "18/07600/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/05/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611543", "long": "-0.690723", "status": "planning", "mw": 40, "ext_id": "8142"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2019-05-24", "start_construction": "2021-06-10", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Loudwater Battery Storage Site", "name_short": "Loudwater Battery Storage Site", "owner": "Capbal", "state": "south east", "country": "uk", "lat": "51.611543", "long": "-0.690723", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.611543+-0.690723", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Torrdhuin, Auchteraw Battery Storage Facility", "city": "", "id": "445", "external_id": "8096", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "445", "external_id": "8096", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Torrdhuin, Auchteraw Battery Storage Facility", "external_id": "8096", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.129676", "long": "-4.731558", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8096", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Torrdhuin, Auchteraw Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land 325M SW Of Torrdhuin", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH32 4BT", "X-coordinate": "234761", "Y-coordinate": "807618", "Planning Authority": "Highland Council", "Planning Application Reference": "20/04565/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.129676", "long": "-4.731558", "status": "planning", "mw": 49, "ext_id": "8096"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "04/08/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8096", "Record Last Updated (dd/mm/yyyy)": "04/08/2023", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Torrdhuin, Auchteraw Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 325M SW Of Torrdhuin", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH32 4BT", "X-coordinate": "234761", "Y-coordinate": "807618", "Planning Authority": "Highland Council", "Planning Application Reference": "20/04565/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.129676", "long": "-4.731558", "status": "planning", "mw": 49, "ext_id": "8096"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Torrdhuin, Auchteraw Battery Storage Facility", "name_short": "Torrdhuin, Auchteraw", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "57.129676", "long": "-4.731558", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.129676+-4.731558", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SHB Hire Ltd", "city": "", "id": "446", "external_id": "8099", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Gerard Hall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "446", "external_id": "8099", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mill Lane, Nursling - Battery Storage Facility", "external_id": "8099", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Gerard Hall Energy", "status": "construction", "date_first_heard": "2020-05-13", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.940857", "long": "-1.493036", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8099", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Gerard Hall Energy", "Site Name": "SHB Hire Ltd", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "SHB Hire Ltd, Mill Lane, Nursling, Southampton, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO16 0YE", "X-coordinate": "435716", "Y-coordinate": "115835", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "19/02772/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/05/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.940857", "long": "-1.493036", "status": "planning", "mw": 20, "ext_id": "8099"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "22/05/2023", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "SHB Hire Ltd", "to": "Mill Lane, Nursling - Battery Storage Facility", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/05/2023", "to": "02/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8099", "Record Last Updated (dd/mm/yyyy)": "02/03/2022", "Operator (or Applicant)": "Gerard Hall Energy", "Site Name": "Mill Lane, Nursling - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SHB Hire Ltd, Mill Lane, Nursling, Southampton, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO16 0YE", "X-coordinate": "435716", "Y-coordinate": "115835", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "19/02772/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/05/2023", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "50.940857", "long": "-1.493036", "status": "construction", "mw": 20, "ext_id": "8099"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "2023-05-22", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-05-13", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mill Lane, Nursling - Battery Storage Facility", "name_short": "Mill Lane, Nursling", "owner": "Gerard Hall Energy", "state": "south east", "country": "uk", "lat": "50.940857", "long": "-1.493036", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.940857+-1.493036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackpark Energy Storage (Resubmission)", "city": "", "id": "448", "external_id": "8105", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Shires Hamilton", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "448", "external_id": "8105", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackpark Energy Storage", "external_id": "8105", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Shires Hamilton", "status": "planning", "date_first_heard": "2020-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.572357", "long": "-3.842632", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8105", "Record Last Updated (dd/mm/yyyy)": "22/01/2021", "Operator (or Applicant)": "Shires Hamilton", "Site Name": "Blackpark Energy Storage (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Black Park Farm, Nairn, Highlands", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5HY", "X-coordinate": "289892", "Y-coordinate": "855084", "Planning Authority": "Highland Council", "Planning Application Reference": "20/02589/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.572357", "long": "-3.842632", "status": "planning", "mw": 30, "ext_id": "8105"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Site Name", "from": "Blackpark Energy Storage (Resubmission)", "to": "Blackpark Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Black Park Farm, Nairn, Highlands", "to": "Black Park Farm, Nairn,", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/01/2021", "to": "12/01/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8105", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Shires Hamilton", "Site Name": "Blackpark Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7226", "Address": "Black Park Farm, Nairn,", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5HY", "X-coordinate": "289892", "Y-coordinate": "855084", "Planning Authority": "Highland Council", "Planning Application Reference": "20/02589/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.572357", "long": "-3.842632", "status": "planning", "mw": 30, "ext_id": "8105"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2020-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackpark Energy Storage", "name_short": "Blackpark", "owner": "Shires Hamilton", "state": "scotland", "country": "uk", "lat": "57.572357", "long": "-3.842632", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.572357+-3.842632", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drumcross Battery Storage", "city": "", "id": "449", "external_id": "8155", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Muirhall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "449", "external_id": "8155", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drumcross Battery Storage", "external_id": "8155", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Muirhall Energy", "status": "planning", "date_first_heard": "2018-06-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.888328", "long": "-3.515963", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8155", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Muirhall Energy", "Site Name": "Drumcross Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land West Of Mossbank Cottages Drumcross Bathgate", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "305280", "Y-coordinate": "667171", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0114/FUL/18", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/02/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/06/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/06/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.888328", "long": "-3.515963", "status": "planning", "mw": 49, "ext_id": "8155"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "15/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Installed Capacity (MWelec)", "from": "49.9", "to": "30", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 49, "to": 30, "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2022", "to": "06/12/2023", "extra": "", "change_type": "misc"}, {"name": "Post Code", "from": "", "to": "EH54 6WF", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8155", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Muirhall Energy", "Site Name": "Drumcross Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land West Of Mossbank Cottages Drumcross Bathgate", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH54 6WF", "X-coordinate": "305280", "Y-coordinate": "667171", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0114/FUL/18", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/02/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/06/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/06/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.888328", "long": "-3.515963", "status": "planning", "mw": 30, "ext_id": "8155"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2018-06-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drumcross Battery Storage", "name_short": "Drumcross", "owner": "Muirhall Energy", "state": "scotland", "country": "uk", "lat": "55.888328", "long": "-3.515963", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.888328+-3.515963", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lower Dunton Road Battery Storage Facility", "city": "", "id": "451", "external_id": "8213", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Cedar Tech Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "451", "external_id": "8213", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lower Dunton Road Battery Storage Facility", "external_id": "8213", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 28, "power_mw": 28, "owner": "Cedar Tech Developments Limited", "status": "planning", "date_first_heard": "2021-02-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.56649", "long": "0.39129", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8213", "Record Last Updated (dd/mm/yyyy)": "24/02/2021", "Operator (or Applicant)": "Cedar Tech Developments Limited", "Site Name": "Lower Dunton Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "28.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sub Station, Lower Dunton Road, Basildon", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS16 6EB", "X-coordinate": "565835", "Y-coordinate": "188000", "Planning Authority": "Thurrock Council", "Planning Application Reference": "20/01491/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.56649", "long": "0.39129", "status": "planning", "mw": 28, "ext_id": "8213"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/02/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2021", "to": "11/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8213", "Record Last Updated (dd/mm/yyyy)": "11/01/2022", "Operator (or Applicant)": "Cedar Tech Developments Limited", "Site Name": "Lower Dunton Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "28", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sub Station, Lower Dunton Road, Basildon", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS16 6EB", "X-coordinate": "565835", "Y-coordinate": "188000", "Planning Authority": "Thurrock Council", "Planning Application Reference": "20/01491/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.56649", "long": "0.39129", "status": "planning", "mw": 28, "ext_id": "8213"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 28, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "planning", "status_class": "", "date_first_heard": "2021-02-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lower Dunton Road Battery Storage Facility", "name_short": "Lower Dunton Road", "owner": "Cedar Tech Developments Limited", "state": "eastern", "country": "uk", "lat": "51.56649", "long": "0.39129", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.56649+0.39129", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Three Bridges Solar Farm", "city": "", "id": "452", "external_id": "8220", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "452", "external_id": "8220", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Three Bridges Solar Farm", "external_id": "8220", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Pathfinder Clean Energy UK Dev Limited", "status": "planning", "date_first_heard": "2021-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.714814", "long": "1.048917", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8220", "Record Last Updated (dd/mm/yyyy)": "07/04/2021", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Three Bridges Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8219", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Three Bridges Solar Farm", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR20 3EJ", "X-coordinate": "606037", "Y-coordinate": "317378", "Planning Authority": "Breckland Council", "Planning Application Reference": "3PL/2020/1134/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/03/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.714814", "long": "1.048917", "status": "planning", "mw": 15, "ext_id": "8220"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/04/2021", "to": "07/05/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8220", "Record Last Updated (dd/mm/yyyy)": "07/05/2021", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Three Bridges Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8219", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Three Bridges Solar Farm", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR20 3EJ", "X-coordinate": "606037", "Y-coordinate": "317378", "Planning Authority": "Breckland Council", "Planning Application Reference": "3PL/2020/1134/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/03/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.714814", "long": "1.048917", "status": "planning", "mw": 15, "ext_id": "8220"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2021-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Three Bridges Solar Farm", "name_short": "Three Bridges Solar Farm", "owner": "Pathfinder Clean Energy UK Dev Limited", "state": "eastern", "country": "uk", "lat": "52.714814", "long": "1.048917", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.714814+1.048917", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Platchaig House, Kilmorack - Battery Storage Facility", "city": "", "id": "453", "external_id": "8248", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "453", "external_id": "8248", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Platchaig House, Kilmorack - Battery Storage Facility", "external_id": "8248", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Renewables", "status": "planning", "date_first_heard": "2021-08-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.469701", "long": "-4.507613", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8248", "Record Last Updated (dd/mm/yyyy)": "02/08/2021", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Platchaig House, Kilmorack - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "410m Sw/O Platchaig House", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV4 7AL", "X-coordinate": "249707", "Y-coordinate": "844935", "Planning Authority": "Highland Council", "Planning Application Reference": "21/03353/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.469701", "long": "-4.507613", "status": "planning", "mw": 49, "ext_id": "8248"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/08/2021", "to": "31/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "14373", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Refused", "from": "", "to": "30/08/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8248", "Record Last Updated (dd/mm/yyyy)": "31/07/2023", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Platchaig House, Kilmorack - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14373", "Are they re-applying (Old REPD Ref) ": "", "Address": "410m Sw/O Platchaig House", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV4 7AL", "X-coordinate": "249707", "Y-coordinate": "844935", "Planning Authority": "Highland Council", "Planning Application Reference": "21/03353/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "30/08/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.469701", "long": "-4.507613", "status": "planning", "mw": 49, "ext_id": "8248"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-08-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Platchaig House, Kilmorack - Battery Storage Facility", "name_short": "Platchaig House, Kilmorack", "owner": "Whirlwind Renewables", "state": "scotland", "country": "uk", "lat": "57.469701", "long": "-4.507613", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.469701+-4.507613", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brentwood nergy Storage System", "city": "", "id": "454", "external_id": "8249", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "454", "external_id": "8249", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Brentwood nergy Storage System", "external_id": "8249", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco Limited", "status": "planning", "date_first_heard": "2021-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.640257", "long": "0.361277", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8249", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Brentwood nergy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Hutton Country, Park Wash Road, Hutton", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM13", "X-coordinate": "563490", "Y-coordinate": "196135", "Planning Authority": "Brentwood Borough Council", "Planning Application Reference": "20/01800/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.640257", "long": "0.361277", "status": "planning", "mw": 49, "ext_id": "8249"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "21/05/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "08/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8249", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Brentwood nergy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hutton Country, Park Wash Road, Hutton", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM13", "X-coordinate": "563490", "Y-coordinate": "196135", "Planning Authority": "Brentwood Borough Council", "Planning Application Reference": "20/01800/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/05/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.640257", "long": "0.361277", "status": "planning", "mw": 49, "ext_id": "8249"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Brentwood nergy Storage System", "name_short": "Brentwood nergy Storage System", "owner": "Anesco Limited", "state": "eastern", "country": "uk", "lat": "51.640257", "long": "0.361277", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.640257+0.361277", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newlands Farm Battery Storage Facility Phase 2", "city": "", "id": "455", "external_id": "8264", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "455", "external_id": "8264", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newlands Farm Battery Storage Facility Phase 2", "external_id": "8264", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "British Solar Renewables", "status": "planning", "date_first_heard": "2021-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.83301", "long": "-1.191431", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8264", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Newlands Farm Battery Storage Facility Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Newlands Farm", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO14 1BL", "X-coordinate": "457038", "Y-coordinate": "104031", "Planning Authority": "Fareham Borough Council", "Planning Application Reference": "P/20/1562/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.83301", "long": "-1.191431", "status": "planning", "mw": 40, "ext_id": "8264"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/01/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "26/01/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "18/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8264", "Record Last Updated (dd/mm/yyyy)": "18/03/2022", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Newlands Farm Battery Storage Facility Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newlands Farm", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO14 1BL", "X-coordinate": "457038", "Y-coordinate": "104031", "Planning Authority": "Fareham Borough Council", "Planning Application Reference": "P/20/1562/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.83301", "long": "-1.191431", "status": "planning", "mw": 40, "ext_id": "8264"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2021-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newlands Farm Battery Storage Facility Phase 2", "name_short": "Newlands Farm Battery Storage Facil...", "owner": "British Solar Renewables", "state": "south east", "country": "uk", "lat": "50.83301", "long": "-1.191431", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.83301+-1.191431", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lakeside Energy Storage Facility", "city": "", "id": "456", "external_id": "8268", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Renewable Energy System Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "456", "external_id": "8268", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lakeside Energy Storage Facility", "external_id": "8268", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Tag Energy UK", "status": "planning", "date_first_heard": "2021-05-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.732727", "long": "-0.989589", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8268", "Record Last Updated (dd/mm/yyyy)": "21/05/2021", "Operator (or Applicant)": "Renewable Energy System Limited", "Site Name": "Lakeside Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Off New Road", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FP", "X-coordinate": "466754", "Y-coordinate": "426733", "Planning Authority": "Selby District Council", "Planning Application Reference": "2020/1357/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.732727", "long": "-0.989589", "status": "planning", "mw": 100, "ext_id": "8268"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/05/2021", "to": "21/06/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Renewable Energy System Limited", "to": "Tag Energy UK", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "100.00", "to": "99.9", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 100, "to": 99, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "06/05/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/06/2022", "to": "09/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8268", "Record Last Updated (dd/mm/yyyy)": "09/12/2021", "Operator (or Applicant)": "Tag Energy UK", "Site Name": "Lakeside Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off New Road", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FP", "X-coordinate": "466754", "Y-coordinate": "426733", "Planning Authority": "Selby District Council", "Planning Application Reference": "2020/1357/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/05/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.732727", "long": "-0.989589", "status": "planning", "mw": 99, "ext_id": "8268"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2021-05-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lakeside Energy Storage Facility", "name_short": "Lakeside Energy", "owner": "Tag Energy UK", "state": "yorkshire and humber", "country": "uk", "lat": "53.732727", "long": "-0.989589", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.732727+-0.989589", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Guildford Road Battery Storage Facility", "city": "", "id": "457", "external_id": "8269", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "457", "external_id": "8269", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Guildford Road Battery Storage Facility", "external_id": "8269", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 14, "power_mw": 14, "owner": "Conrad Energy (Developments) Limited", "status": "planning", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.151827", "long": "-0.506714", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8269", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Conrad Energy (Developments) Limited", "Site Name": "Guildford Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "W/O Guildford Road", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "GU6 8PA", "X-coordinate": "504538", "Y-coordinate": "140234", "Planning Authority": "Waverley Borough Council", "Planning Application Reference": "WA/2020/1937", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.151827", "long": "-0.506714", "status": "planning", "mw": 14, "ext_id": "8269"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "24/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8269", "Record Last Updated (dd/mm/yyyy)": "24/03/2023", "Operator (or Applicant)": "Conrad Energy (Developments) Limited", "Site Name": "Guildford Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Guildford Road", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "GU6 8PA", "X-coordinate": "504538", "Y-coordinate": "140234", "Planning Authority": "Waverley Borough Council", "Planning Application Reference": "WA/2020/1937", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.151827", "long": "-0.506714", "status": "planning", "mw": 14, "ext_id": "8269"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 14, "mwh_is_estimate": true, "mwh": 14, "mwh_estimate": 14, "status": "planning", "status_class": "", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Guildford Road Battery Storage Facility", "name_short": "Guildford Road", "owner": "Conrad Energy (Developments) Limited", "state": "south east", "country": "uk", "lat": "51.151827", "long": "-0.506714", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.151827+-0.506714", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gerrards Cross Sewage Treatment Works", "city": "", "id": "458", "external_id": "8271", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Peak Gen Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "458", "external_id": "8271", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gerrards Cross Sewage Treatment Works", "external_id": "8271", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Peak Gen Power", "status": "planning", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.57847", "long": "-0.531047", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8271", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Peak Gen Power", "Site Name": "Gerrards Cross Sewage Treatment Works", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Gerrards Cross Sewage Treatment Works", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "SL9 7BE", "X-coordinate": "501886", "Y-coordinate": "187645", "Planning Authority": "South Bucks District Council", "Planning Application Reference": "PL/20/4234/FA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.57847", "long": "-0.531047", "status": "planning", "mw": 20, "ext_id": "8271"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8271", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Peak Gen Power", "Site Name": "Gerrards Cross Sewage Treatment Works", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Gerrards Cross Sewage Treatment Works", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "SL9 7BE", "X-coordinate": "501886", "Y-coordinate": "187645", "Planning Authority": "South Bucks District Council", "Planning Application Reference": "PL/20/4234/FA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.57847", "long": "-0.531047", "status": "planning", "mw": 20, "ext_id": "8271"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Gerrards Cross Sewage Treatment Works", "name_short": "Gerrards Cross Sewage Treatment Wor...", "owner": "Peak Gen Power", "state": "south east", "country": "uk", "lat": "51.57847", "long": "-0.531047", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.57847+-0.531047", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cottom Power Station", "city": "", "id": "459", "external_id": "8278", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Thermal Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "459", "external_id": "8278", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cottom Power Station", "external_id": "8278", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "EDF Energy Thermal Generation Limited", "status": "planning", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.303393", "long": "-0.781494", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8278", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "EDF Energy Thermal Generation Limited", "Site Name": "Cottom Power Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Cottam Power Station", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 0EU", "X-coordinate": "481298", "Y-coordinate": "379186", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "20/01288/CTP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.303393", "long": "-0.781494", "status": "planning", "mw": 50, "ext_id": "8278"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8278", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "EDF Energy Thermal Generation Limited", "Site Name": "Cottom Power Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cottam Power Station", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 0EU", "X-coordinate": "481298", "Y-coordinate": "379186", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "20/01288/CTP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.303393", "long": "-0.781494", "status": "planning", "mw": 50, "ext_id": "8278"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cottom Power Station", "name_short": "Cottom Power Station", "owner": "EDF Energy Thermal Generation Limited", "state": "east midlands", "country": "uk", "lat": "53.303393", "long": "-0.781494", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.303393+-0.781494", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Capenhurst Lane", "city": "", "id": "460", "external_id": "8283", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Native River Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "460", "external_id": "8283", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Capenhurst Lane", "external_id": "8283", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Native River Limited", "status": "planning", "date_first_heard": "2021-04-16", "start_construction": "2022-01-24", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.264888", "long": "-2.946107", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8283", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Native River Limited", "Site Name": "Capenhurst Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Adj Electricity Substation", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH66 2HD", "X-coordinate": "336992", "Y-coordinate": "374628", "Planning Authority": "", "Planning Application Reference": "20/04767/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.264888", "long": "-2.946107", "status": "planning", "mw": 57, "ext_id": "8283"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "24/01/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "", "to": "Cheshire West and Chester Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/04/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/01/2022", "to": "15/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/04/2024", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/02/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/07/2022", "to": "25/04/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8283", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Native River Limited", "Site Name": "Capenhurst Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Electricity Substation", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH66 2HD", "X-coordinate": "336992", "Y-coordinate": "374628", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "20/04767/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/04/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.264888", "long": "-2.946107", "status": "planning", "mw": 57, "ext_id": "8283"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "2022-01-24", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2021-04-16", "start_construction": "2022-01-24", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Capenhurst Lane", "name_short": "Capenhurst Lane", "owner": "Native River Limited", "state": "north west", "country": "uk", "lat": "53.264888", "long": "-2.946107", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.264888+-2.946107", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Park Farm, Herongate Solar Photovoltaic PV Farm", "city": "", "id": "461", "external_id": "8358", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "461", "external_id": "8358", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Crouch Solar Farm", "external_id": "8358", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Low Carbon Storage", "status": "planning", "date_first_heard": "2021-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.590019", "long": "0.376529", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8358", "Record Last Updated (dd/mm/yyyy)": "20/05/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "Park Farm, Herongate Solar Photovoltaic PV Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8357", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Dunton Road", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM13 3SG", "X-coordinate": "564727", "Y-coordinate": "190583", "Planning Authority": "Brentwood Borough Council", "Planning Application Reference": "21/00834/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.590019", "long": "0.376529", "status": "planning", "mw": 49, "ext_id": "8358"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/05/2021", "to": "14/03/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Private Developer", "to": "Low Carbon Storage", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Dunton Road", "to": "Park Farm, Dunton Road, Brentwood", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "23/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "23/12/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2022", "to": "11/07/2023", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Park Farm, Herongate Solar Photovoltaic PV Farm", "to": "Crouch Solar Farm", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8358", "Record Last Updated (dd/mm/yyyy)": "11/07/2023", "Operator (or Applicant)": "Low Carbon Storage", "Site Name": "Crouch Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8357", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Park Farm, Dunton Road, Brentwood", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM13 3SG", "X-coordinate": "564727", "Y-coordinate": "190583", "Planning Authority": "Brentwood Borough Council", "Planning Application Reference": "21/00834/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.590019", "long": "0.376529", "status": "planning", "mw": 49, "ext_id": "8358"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Crouch Solar Farm", "name_short": "Crouch Solar Farm", "owner": "Low Carbon Storage", "state": "eastern", "country": "uk", "lat": "51.590019", "long": "0.376529", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.590019+0.376529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Old Gallows Road - Battery storage", "city": "", "id": "462", "external_id": "8368", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "462", "external_id": "8368", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Old Gallows Road - Battery storage", "external_id": "8368", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Renewables", "status": "planning", "date_first_heard": "2021-08-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.396899", "long": "-3.49004", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8368", "Record Last Updated (dd/mm/yyyy)": "28/04/2021", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Old Gallows Road - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Old Gallows Road", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH1", "X-coordinate": "308124", "Y-coordinate": "723734", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "21/00235/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.396899", "long": "-3.49004", "status": "planning", "mw": 49, "ext_id": "8368"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/04/2021", "to": "08/02/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/08/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8368", "Record Last Updated (dd/mm/yyyy)": "08/02/2021", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Old Gallows Road - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Old Gallows Road", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH1", "X-coordinate": "308124", "Y-coordinate": "723734", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "21/00235/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/08/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.396899", "long": "-3.49004", "status": "planning", "mw": 49, "ext_id": "8368"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-08-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Old Gallows Road - Battery storage", "name_short": "Old Gallows Road", "owner": "Whirlwind Renewables", "state": "scotland", "country": "uk", "lat": "56.396899", "long": "-3.49004", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.396899+-3.49004", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Farburn Place - Energy Storage Facility", "city": "", "id": "463", "external_id": "8385", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Peak Reserve Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "463", "external_id": "8385", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Farburn Place - Energy Storage Facility", "external_id": "8385", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Peak Reserve Power Limited / Centrica / Cragside", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.202831", "long": "-2.191083", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8385", "Record Last Updated (dd/mm/yyyy)": "11/10/2021", "Operator (or Applicant)": "Peak Reserve Power Limited", "Site Name": "Farburn Place - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Place Dyce", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB21 7GP", "X-coordinate": "388554", "Y-coordinate": "812466", "Planning Authority": "Aberdeen City Council", "Planning Application Reference": "210665/DPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.202831", "long": "-2.191083", "status": "planning", "mw": 30, "ext_id": "8385"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "30/09/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/10/2021", "to": "21/12/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Peak Reserve Power Limited", "to": "Peak Reserve Power Limited / Centrica / Cragside", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/12/2022", "to": "08/02/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8385", "Record Last Updated (dd/mm/yyyy)": "08/02/2021", "Operator (or Applicant)": "Peak Reserve Power Limited / Centrica / Cragside", "Site Name": "Farburn Place - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Place Dyce", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB21 7GP", "X-coordinate": "388554", "Y-coordinate": "812466", "Planning Authority": "Aberdeen City Council", "Planning Application Reference": "210665/DPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.202831", "long": "-2.191083", "status": "planning", "mw": 30, "ext_id": "8385"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Farburn Place - Energy Storage Facility", "name_short": "Farburn Place - Energy", "owner": "Peak Reserve Power Limited / Centrica / Cragside", "state": "scotland", "country": "uk", "lat": "57.202831", "long": "-2.191083", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.202831+-2.191083", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane Battery Storage", "city": "", "id": "464", "external_id": "8430", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Walker & Son (Hauliers) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "464", "external_id": "8430", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane Battery Storage", "external_id": "8430", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "Walker & Son (Hauliers) Limited", "status": "planning", "date_first_heard": "2021-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.71833", "long": "-1.275579", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8430", "Record Last Updated (dd/mm/yyyy)": "11/05/2021", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Kirkhaw Lane Knottingley West Yorkshire", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447904", "Y-coordinate": "424901", "Planning Authority": "Wakefield Council", "Planning Application Reference": "21/00180/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.71833", "long": "-1.275579", "status": "planning", "mw": 32, "ext_id": "8430"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/05/2021", "to": "24/02/2022", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Kirkhaw Lane Knottingley West Yorkshire", "to": "Kirkhaw Lane Knottingley ", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2022", "to": "02/03/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8430", "Record Last Updated (dd/mm/yyyy)": "02/03/2021", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10145", "Are they re-applying (Old REPD Ref) ": "7149", "Address": "Kirkhaw Lane Knottingley ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447904", "Y-coordinate": "424901", "Planning Authority": "Wakefield Council", "Planning Application Reference": "21/00180/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.71833", "long": "-1.275579", "status": "planning", "mw": 32, "ext_id": "8430"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "planning", "status_class": "", "date_first_heard": "2021-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane Battery Storage", "name_short": "Kirkhaw Lane", "owner": "Walker & Son (Hauliers) Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.71833", "long": "-1.275579", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.71833+-1.275579", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Minchens Lane Battery Storage Facility", "city": "", "id": "465", "external_id": "8434", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "465", "external_id": "8434", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Minchens Lane Battery Storage Facility", "external_id": "8434", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Penso Power", "status": "planning", "date_first_heard": "2023-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.331436", "long": "-1.066893", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8434", "Record Last Updated (dd/mm/yyyy)": "02/03/2021", "Operator (or Applicant)": "Penso Power", "Site Name": "Minchens Lane Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "OS Ref 464762 159811 Minchens Lane Bramley ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG26", "X-coordinate": "465106", "Y-coordinate": "159562", "Planning Authority": "Basingstoke and Deane Borough Council", "Planning Application Reference": "21/00349/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.331436", "long": "-1.066893", "status": "planning", "mw": 100, "ext_id": "8434"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2021", "to": "03/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Appeal Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Basingstoke and Deane Borough Council", "to": "Basingstoke & Deane Borough Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Refused", "from": "", "to": "08/10/2021", "extra": "", "change_type": "misc"}, {"name": "Appeal Granted", "from": "", "to": "26/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "26/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/02/2023", "to": "21/09/2023", "extra": "", "change_type": "misc"}, {"name": "Appeal Lodged", "from": "", "to": "22/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8434", "Record Last Updated (dd/mm/yyyy)": "21/09/2023", "Operator (or Applicant)": "Penso Power", "Site Name": "Minchens Lane Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "OS Ref 464762 159811 Minchens Lane Bramley ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG26", "X-coordinate": "465106", "Y-coordinate": "159562", "Planning Authority": "Basingstoke & Deane Borough Council", "Planning Application Reference": "21/00349/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "08/10/2021", "Appeal Lodged": "22/12/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "26/01/2023", "Planning Permission Granted": "26/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.331436", "long": "-1.066893", "status": "planning", "mw": 100, "ext_id": "8434"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Minchens Lane Battery Storage Facility", "name_short": "Minchens Lane", "owner": "Penso Power", "state": "south east", "country": "uk", "lat": "51.331436", "long": "-1.066893", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.331436+-1.066893", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grids Rainhill Substation Battery storage facility", "city": "", "id": "466", "external_id": "8439", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Sizing John Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "466", "external_id": "8439", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grids Rainhill Substation Battery storage facility", "external_id": "8439", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Sizing John Limited", "status": "planning", "date_first_heard": "2021-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419678", "long": "-2.738489", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8439", "Record Last Updated (dd/mm/yyyy)": "02/03/2021", "Operator (or Applicant)": "Sizing John Limited", "Site Name": "National Grids Rainhill Substation Battery storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "\ufffdLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens WA9 4QH", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "WA9 4QH", "X-coordinate": "351018", "Y-coordinate": "391685", "Planning Authority": "St Helens Council", "Planning Application Reference": "P/2021/0094/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419678", "long": "-2.738489", "status": "planning", "mw": 57, "ext_id": "8439"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "\ufffdLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens WA9 4QH", "to": "\ufffdLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "07/06/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2021", "to": "21/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "11559", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/10/2022", "to": "02/08/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8439", "Record Last Updated (dd/mm/yyyy)": "02/08/2021", "Operator (or Applicant)": "Sizing John Limited", "Site Name": "National Grids Rainhill Substation Battery storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11559", "Are they re-applying (Old REPD Ref) ": "", "Address": "\ufffdLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens ", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "WA9 4QH", "X-coordinate": "351018", "Y-coordinate": "391685", "Planning Authority": "St Helens Council", "Planning Application Reference": "P/2021/0094/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419678", "long": "-2.738489", "status": "planning", "mw": 57, "ext_id": "8439"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2021-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "National Grids Rainhill Substation Battery storage facility", "name_short": "National Grids Rainhill Substation", "owner": "Sizing John Limited", "state": "north west", "country": "uk", "lat": "53.419678", "long": "-2.738489", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419678+-2.738489", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trondheim Way Battery energy storage", "city": "", "id": "467", "external_id": "8455", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Burns Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "467", "external_id": "8455", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Trondheim Way Battery energy storage", "external_id": "8455", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Vox Burns Limited", "status": "construction", "date_first_heard": "2021-05-14", "start_construction": "2021-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.606539", "long": "-0.180157", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8455", "Record Last Updated (dd/mm/yyyy)": "24/05/2021", "Operator (or Applicant)": "Vox Burns Limited", "Site Name": "Trondheim Way Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Trondheim Way Stallingborough North East Lincolnshire", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN37 8FD", "X-coordinate": "520507", "Y-coordinate": "413759", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/0120/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.606539", "long": "-0.180157", "status": "planning", "mw": 80, "ext_id": "8455"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2021", "to": "12/01/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land At Trondheim Way Stallingborough North East Lincolnshire", "to": "Land At Trondheim Way Stallingborough", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/09/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2022", "to": "13/05/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8455", "Record Last Updated (dd/mm/yyyy)": "13/05/2021", "Operator (or Applicant)": "Vox Burns Limited", "Site Name": "Trondheim Way Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Trondheim Way Stallingborough", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN37 8FD", "X-coordinate": "520507", "Y-coordinate": "413759", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/0120/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.606539", "long": "-0.180157", "status": "construction", "mw": 80, "ext_id": "8455"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-24", "start_construction": "2022-01-12", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-05-14", "start_construction": "2021-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Trondheim Way Battery energy storage", "name_short": "Trondheim Way", "owner": "Vox Burns Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.606539", "long": "-0.180157", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.606539+-0.180157", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bristol Avenue - Battery Energy Storage Facility", "city": "", "id": "469", "external_id": "8809", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Henco International Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "469", "external_id": "8809", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bristol Avenue - Battery Energy Storage Facility", "external_id": "8809", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Henco International Limited", "status": "planning", "date_first_heard": "2021-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.849526", "long": "-3.02841", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8809", "Record Last Updated (dd/mm/yyyy)": "17/05/2021", "Operator (or Applicant)": "Henco International Limited", "Site Name": "Bristol Avenue - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "281 BRISTOL AVENUE, BLACKPOOL, FY2 0JF", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "FY2 0JF", "X-coordinate": "332442", "Y-coordinate": "439745", "Planning Authority": "Blackpool City Council", "Planning Application Reference": "21/0246", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.849526", "long": "-3.02841", "status": "planning", "mw": 25, "ext_id": "8809"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Address", "from": "281 BRISTOL AVENUE, BLACKPOOL, FY2 0JF", "to": "281 BRISTOL AVENUE, BLACKPOOL, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "11/05/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Blackpool City Council", "to": "Blackpool Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8809", "Record Last Updated (dd/mm/yyyy)": "17/05/2021", "Operator (or Applicant)": "Henco International Limited", "Site Name": "Bristol Avenue - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "281 BRISTOL AVENUE, BLACKPOOL, ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "FY2 0JF", "X-coordinate": "332442", "Y-coordinate": "439745", "Planning Authority": "Blackpool Council", "Planning Application Reference": "21/0246", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/05/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.849526", "long": "-3.02841", "status": "planning", "mw": 25, "ext_id": "8809"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2021-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bristol Avenue - Battery Energy Storage Facility", "name_short": "Bristol Avenue - Battery Energy", "owner": "Henco International Limited", "state": "north west", "country": "uk", "lat": "53.849526", "long": "-3.02841", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.849526+-3.02841", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Howick Hall Farm - Battery Storage Facility", "city": "", "id": "470", "external_id": "8829", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Penwortham Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "470", "external_id": "8829", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Howick Hall Farm - Battery Storage Facility", "external_id": "8829", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Penwortham Storage Limited", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.746291", "long": "-2.750347", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8829", "Record Last Updated (dd/mm/yyyy)": "18/03/2021", "Operator (or Applicant)": "Penwortham Storage Limited", "Site Name": "Howick Hall Farm - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Howick Hall Farm Howick Cross Lane Penwortham Preston Lancashire PR1 0NS", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR1 0NS", "X-coordinate": "350613", "Y-coordinate": "428030", "Planning Authority": "South Ribble Borough Council", "Planning Application Reference": "07/2021/00252/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.746291", "long": "-2.750347", "status": "planning", "mw": 49, "ext_id": "8829"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8829", "Record Last Updated (dd/mm/yyyy)": "18/03/2021", "Operator (or Applicant)": "Penwortham Storage Limited", "Site Name": "Howick Hall Farm - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Howick Hall Farm Howick Cross Lane Penwortham Preston Lancashire PR1 0NS", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR1 0NS", "X-coordinate": "350613", "Y-coordinate": "428030", "Planning Authority": "South Ribble Borough Council", "Planning Application Reference": "07/2021/00252/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.746291", "long": "-2.750347", "status": "planning", "mw": 49, "ext_id": "8829"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Howick Hall Farm - Battery Storage Facility", "name_short": "Howick Hall Farm", "owner": "Penwortham Storage Limited", "state": "north west", "country": "uk", "lat": "53.746291", "long": "-2.750347", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.746291+-2.750347", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holt Road - Battery Energy Storage System", "city": "", "id": "471", "external_id": "8833", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Mannington Energy Centre Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "471", "external_id": "8833", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mannington Battery Energy Storage System", "external_id": "8833", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "EDF Energy Renewables", "status": "construction", "date_first_heard": "2021-06-18", "start_construction": "2022-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.848421", "long": "-1.901823", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8833", "Record Last Updated (dd/mm/yyyy)": "26/03/2021", "Operator (or Applicant)": "Mannington Energy Centre Limited", "Site Name": "Holt Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land off Holt Road", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH21", "X-coordinate": "407008", "Y-coordinate": "105438", "Planning Authority": "East Dorset District Council", "Planning Application Reference": "3/21/0137/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.848421", "long": "-1.901823", "status": "planning", "mw": 49, "ext_id": "8833"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/03/2021", "to": "01/02/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Mannington Energy Centre Limited", "to": "EDF Energy Renewables", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Holt Road - Battery Energy Storage System", "to": "Mannington Battery Energy Storage System", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/06/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/06/2024", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2023", "to": "26/03/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8833", "Record Last Updated (dd/mm/yyyy)": "26/03/2021", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Mannington Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land off Holt Road", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH21", "X-coordinate": "407008", "Y-coordinate": "105438", "Planning Authority": "East Dorset District Council", "Planning Application Reference": "3/21/0137/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/06/2024", "Under Construction": "01/10/2022", "Operational": "", "Heat Network Ref": "", "lat": "50.848421", "long": "-1.901823", "status": "construction", "mw": 49, "ext_id": "8833"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-26", "start_construction": "2023-02-01", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-06-18", "start_construction": "2022-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mannington Battery Energy Storage System", "name_short": "Mannington Battery", "owner": "EDF Energy Renewables", "state": "south west", "country": "uk", "lat": "50.848421", "long": "-1.901823", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.848421+-1.901823", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bolfornought Farm Battery Storage Facility", "city": "", "id": "472", "external_id": "8912", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "472", "external_id": "8912", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bolfornought Farm Battery Storage Facility", "external_id": "8912", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2021-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.120552", "long": "-3.895117", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8912", "Record Last Updated (dd/mm/yyyy)": "27/04/2021", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Bolfornought Farm Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land 650M South West Of Bolfornought Farm Stirling", "County": "Central", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK7 7LL", "X-coordinate": "282277", "Y-coordinate": "693597", "Planning Authority": "Stirling Council", "Planning Application Reference": "21/00293/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.120552", "long": "-3.895117", "status": "planning", "mw": 49, "ext_id": "8912"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8912", "Record Last Updated (dd/mm/yyyy)": "27/04/2021", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Bolfornought Farm Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 650M South West Of Bolfornought Farm Stirling", "County": "Central", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK7 7LL", "X-coordinate": "282277", "Y-coordinate": "693597", "Planning Authority": "Stirling Council", "Planning Application Reference": "21/00293/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.120552", "long": "-3.895117", "status": "planning", "mw": 49, "ext_id": "8912"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bolfornought Farm Battery Storage Facility", "name_short": "Bolfornought Farm", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "56.120552", "long": "-3.895117", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.120552+-3.895117", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Skelton Battery Storage Facility", "city": "", "id": "473", "external_id": "8914", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Skelton Peak Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "473", "external_id": "8914", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Skelton Grange Battery Storage Facility", "external_id": "8914", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Catalyst Capital LLP", "status": "planning", "date_first_heard": "2021-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.777943", "long": "-1.491189", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8914", "Record Last Updated (dd/mm/yyyy)": "27/04/2021", "Operator (or Applicant)": "Skelton Peak Power Limited", "Site Name": "Skelton Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Former Skelton Grange Power Station Site West Road North Leeds", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS10 1RR", "X-coordinate": "433628", "Y-coordinate": "431410", "Planning Authority": "Leeds City Council", "Planning Application Reference": "21/02628/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.777943", "long": "-1.491189", "status": "planning", "mw": 99, "ext_id": "8914"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2021", "to": "24/01/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Skelton Peak Power Limited", "to": "Catalyst Capital LLP", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Skelton Battery Storage Facility", "to": "Skelton Grange Battery Storage Facility", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "04/08/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "04/08/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8914", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Catalyst Capital LLP", "Site Name": "Skelton Grange Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Skelton Grange Power Station Site West Road North Leeds", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS10 1RR", "X-coordinate": "433628", "Y-coordinate": "431410", "Planning Authority": "Leeds City Council", "Planning Application Reference": "21/02628/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/08/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.777943", "long": "-1.491189", "status": "planning", "mw": 99, "ext_id": "8914"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2021-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Skelton Grange Battery Storage Facility", "name_short": "Skelton Grange", "owner": "Catalyst Capital LLP", "state": "yorkshire and humber", "country": "uk", "lat": "53.777943", "long": "-1.491189", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.777943+-1.491189", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitehills Energy Storage Facility", "city": "", "id": "474", "external_id": "8916", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "474", "external_id": "8916", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitehills Energy Storage Facility", "external_id": "8916", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gigabox Developments Limited / Whirlwind Renewables", "status": "planning", "date_first_heard": "2021-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.653468", "long": "-2.87036", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8916", "Record Last Updated (dd/mm/yyyy)": "20/09/2021", "Operator (or Applicant)": "Gigabox Developments Limited", "Site Name": "Whitehills Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Energy Storage Unit 1 Old Brechin Road Forfar", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD8 3HH", "X-coordinate": "346735", "Y-coordinate": "751635", "Planning Authority": "Angus Council", "Planning Application Reference": "21/00534/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.653468", "long": "-2.87036", "status": "planning", "mw": 49, "ext_id": "8916"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/09/2021", "to": "11/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "15/12/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/03/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Operator (or Applicant)", "from": "Gigabox Developments Limited", "to": "Gigabox Developments Limited / Whirlwind Renewables", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8916", "Record Last Updated (dd/mm/yyyy)": "17/10/2022", "Operator (or Applicant)": "Gigabox Developments Limited / Whirlwind Renewables", "Site Name": "Whitehills Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Energy Storage Unit 1 Old Brechin Road Forfar", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD8 3HH", "X-coordinate": "346735", "Y-coordinate": "751635", "Planning Authority": "Angus Council", "Planning Application Reference": "21/00534/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.653468", "long": "-2.87036", "status": "planning", "mw": 49, "ext_id": "8916"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whitehills Energy Storage Facility", "name_short": "Whitehills Energy", "owner": "Gigabox Developments Limited / Whirlwind Renewables", "state": "scotland", "country": "uk", "lat": "56.653468", "long": "-2.87036", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.653468+-2.87036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dersalloch Battery Storage Facility", "city": "", "id": "475", "external_id": "8927", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables (UK) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "475", "external_id": "8927", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dersalloch Battery Storage Facility", "external_id": "8927", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Scottish Power Renewables (UK) Limited", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.321678", "long": "-4.477597", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8927", "Record Last Updated (dd/mm/yyyy)": "28/04/2021", "Operator (or Applicant)": "Scottish Power Renewables (UK) Limited", "Site Name": "Dersalloch Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Wind Farm At Dersalloch B741 Dalmellington Road Straiton, Council Boundary Straiton, Maybole", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7QA", "X-coordinate": "242893", "Y-coordinate": "605864", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002112", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.321678", "long": "-4.477597", "status": "planning", "mw": 50, "ext_id": "8927"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/04/2021", "to": "22/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/11/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "29/11/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8927", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "Scottish Power Renewables (UK) Limited", "Site Name": "Dersalloch Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wind Farm At Dersalloch B741 Dalmellington Road Straiton, Council Boundary Straiton, Maybole", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7QA", "X-coordinate": "242893", "Y-coordinate": "605864", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002112", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/11/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.321678", "long": "-4.477597", "status": "planning", "mw": 50, "ext_id": "8927"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dersalloch Battery Storage Facility", "name_short": "Dersalloch", "owner": "Scottish Power Renewables (UK) Limited", "state": "scotland", "country": "uk", "lat": "55.321678", "long": "-4.477597", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.321678+-4.477597", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stor Generation Plant - Battery Storage", "city": "", "id": "477", "external_id": "8998", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "477", "external_id": "8998", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stor Generation Plant - Battery Storage", "external_id": "8998", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2021-06-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.795412", "long": "-1.790361", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8998", "Record Last Updated (dd/mm/yyyy)": "10/05/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Stor Generation Plant - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Stor Generation Plant, Duncombe Road, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD8 9TB", "X-coordinate": "413907", "Y-coordinate": "433254", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "21/02041/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.795412", "long": "-1.790361", "status": "planning", "mw": 12, "ext_id": "8998"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/06/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8998", "Record Last Updated (dd/mm/yyyy)": "10/05/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Stor Generation Plant - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stor Generation Plant, Duncombe Road, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD8 9TB", "X-coordinate": "413907", "Y-coordinate": "433254", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "21/02041/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/06/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.795412", "long": "-1.790361", "status": "planning", "mw": 12, "ext_id": "8998"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2021-06-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stor Generation Plant - Battery Storage", "name_short": "Stor Generation Plant", "owner": "Green Frog Power 214 Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.795412", "long": "-1.790361", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.795412+-1.790361", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hull East Stor Generation Compound - Battery energy storage", "city": "", "id": "478", "external_id": "9006", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "478", "external_id": "9006", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hull East Stor Generation Compound - Battery energy storage", "external_id": "9006", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2021-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.749197", "long": "-0.254196", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9006", "Record Last Updated (dd/mm/yyyy)": "12/05/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Hull East Stor Generation Compound - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Hull East Stor Generation Compound, Great Field Lane, Somerden Road, Kingston Upon Hull", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU9 5PE", "X-coordinate": "515219", "Y-coordinate": "429506", "Planning Authority": "Kingston upon Hull City Council", "Planning Application Reference": "21/00631/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/07/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.749197", "long": "-0.254196", "status": "planning", "mw": 20, "ext_id": "9006"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "29/07/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9006", "Record Last Updated (dd/mm/yyyy)": "12/05/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Hull East Stor Generation Compound - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hull East Stor Generation Compound, Great Field Lane, Somerden Road, Kingston Upon Hull", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU9 5PE", "X-coordinate": "515219", "Y-coordinate": "429506", "Planning Authority": "Kingston upon Hull City Council", "Planning Application Reference": "21/00631/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/07/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/07/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.749197", "long": "-0.254196", "status": "planning", "mw": 20, "ext_id": "9006"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hull East Stor Generation Compound - Battery energy storage", "name_short": "Hull East Stor Generation Compound", "owner": "Green Frog Power 214 Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.749197", "long": "-0.254196", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.749197+-0.254196", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kilgallioch - Battery energy storage", "city": "", "id": "479", "external_id": "9007", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Scottish Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "479", "external_id": "9007", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kilgallioch - Battery energy storage", "external_id": "9007", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Scottish Power Renewables", "status": "planning", "date_first_heard": "2021-05-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.234924", "long": "-4.855574", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9007", "Record Last Updated (dd/mm/yyyy)": "12/05/2021", "Operator (or Applicant)": "Scottish Renewables Limited", "Site Name": "Kilgallioch - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Wind Farm, Kilgallioch C72 From Gowlands Terrace, Barrhill To Council Boundary S/O Chirmorrie South From Barrhill, Barrhill, Girvan", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26", "X-coordinate": "218521", "Y-coordinate": "597132", "Planning Authority": "South Ayrshire Council", "Planning Application Reference": "21/00387/DEEM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.234924", "long": "-4.855574", "status": "planning", "mw": 100, "ext_id": "9007"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/05/2021", "to": "18/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Scottish Renewables Limited", "to": "Scottish Power Renewables", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Stand-alone Storage", "to": "Co-located with RE", "extra": "", "change_type": "misc"}, {"name": "Storage Co-location REPD Ref ID", "from": "", "to": "4386", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Strathclyde", "to": "Dumfries and Galloway", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "South Ayrshire Council", "to": "Scottish Government (S36)", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/00387/DEEM", "to": "ECU00002197", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "29/03/2021", "to": "13/01/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9007", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Kilgallioch - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4386", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wind Farm, Kilgallioch C72 From Gowlands Terrace, Barrhill To Council Boundary S/O Chirmorrie South From Barrhill, Barrhill, Girvan", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26", "X-coordinate": "218521", "Y-coordinate": "597132", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002197", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.234924", "long": "-4.855574", "status": "planning", "mw": 100, "ext_id": "9007"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-05-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kilgallioch - Battery energy storage", "name_short": "Kilgallioch", "owner": "Scottish Power Renewables", "state": "scotland", "country": "uk", "lat": "55.234924", "long": "-4.855574", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.234924+-4.855574", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Standby Embedded Stor Power Plant - Battery storage", "city": "", "id": "480", "external_id": "9010", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "480", "external_id": "9010", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Standby Embedded Stor Power Plant - Battery storage", "external_id": "9010", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Green Frog Power 214 Limited", "status": "construction", "date_first_heard": "2021-06-16", "start_construction": "2022-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.003612", "long": "-1.482182", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9010", "Record Last Updated (dd/mm/yyyy)": "21/06/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Standby Embedded Stor Power Plant - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Standby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE29 7UZ", "X-coordinate": "433220", "Y-coordinate": "567794", "Planning Authority": "North Tyneside Council", "Planning Application Reference": "21/01109/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.003612", "long": "-1.482182", "status": "planning", "mw": 20, "ext_id": "9010"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "16/06/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/06/2021", "to": "16/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9010", "Record Last Updated (dd/mm/yyyy)": "16/01/2023", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Standby Embedded Stor Power Plant - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Standby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE29 7UZ", "X-coordinate": "433220", "Y-coordinate": "567794", "Planning Authority": "North Tyneside Council", "Planning Application Reference": "21/01109/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/06/2024", "Under Construction": "01/10/2022", "Operational": "", "Heat Network Ref": "", "lat": "55.003612", "long": "-1.482182", "status": "construction", "mw": 20, "ext_id": "9010"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-21", "start_construction": "2023-01-16", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-06-16", "start_construction": "2022-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Standby Embedded Stor Power Plant - Battery storage", "name_short": "Standby Embedded Stor Power Plant", "owner": "Green Frog Power 214 Limited", "state": "north east", "country": "uk", "lat": "55.003612", "long": "-1.482182", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.003612+-1.482182", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greens Farm - Battery energy storage", "city": "", "id": "481", "external_id": "9012", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelham Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "481", "external_id": "9012", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Greens Farm - Battery energy storage", "external_id": "9012", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pelham Power Limited", "status": "planning", "date_first_heard": "2021-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.932904", "long": "0.115217", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9012", "Record Last Updated (dd/mm/yyyy)": "13/05/2021", "Operator (or Applicant)": "Pelham Power Limited", "Site Name": "Greens Farm - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Greens Farm, East End, Stocking Pelham, Buntingford", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG9 0JU", "X-coordinate": "545521", "Y-coordinate": "228157", "Planning Authority": "East Hertfordshire District Council", "Planning Application Reference": "3/21/0969/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.932904", "long": "0.115217", "status": "planning", "mw": 49, "ext_id": "9012"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9012", "Record Last Updated (dd/mm/yyyy)": "13/05/2021", "Operator (or Applicant)": "Pelham Power Limited", "Site Name": "Greens Farm - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Greens Farm, East End, Stocking Pelham, Buntingford", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG9 0JU", "X-coordinate": "545521", "Y-coordinate": "228157", "Planning Authority": "East Hertfordshire District Council", "Planning Application Reference": "3/21/0969/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.932904", "long": "0.115217", "status": "planning", "mw": 49, "ext_id": "9012"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Greens Farm - Battery energy storage", "name_short": "Greens Farm", "owner": "Pelham Power Limited", "state": "eastern", "country": "uk", "lat": "51.932904", "long": "0.115217", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.932904+0.115217", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Maiden, Annfield Plain - Energy Storage", "city": "", "id": "482", "external_id": "9036", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "38", "power_mw": "38", "customer": "", "owner": "Stephenson Mohl Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "482", "external_id": "9036", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Maiden, Annfield Plain - Energy Storage", "external_id": "9036", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 38, "power_mw": 38, "owner": "Stephenson Mohl Development", "status": "planning", "date_first_heard": "2021-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.848812", "long": "-1.732319", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9036", "Record Last Updated (dd/mm/yyyy)": "18/05/2021", "Operator (or Applicant)": "Stephenson Mohl Development", "Site Name": "Maiden, Annfield Plain - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "38.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land To The South West Of Morrison Industrial Estate And West Of Lanchester Road Maiden Law", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH9 7XW", "X-coordinate": "417286", "Y-coordinate": "550478", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/21/01583/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.848812", "long": "-1.732319", "status": "planning", "mw": 38, "ext_id": "9036"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2021", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/08/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/12/2021", "to": "28/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9036", "Record Last Updated (dd/mm/yyyy)": "28/07/2022", "Operator (or Applicant)": "Stephenson Mohl Development", "Site Name": "Maiden, Annfield Plain - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "38", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South West Of Morrison Industrial Estate And West Of Lanchester Road Maiden Law", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH9 7XW", "X-coordinate": "417286", "Y-coordinate": "550478", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/21/01583/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.848812", "long": "-1.732319", "status": "planning", "mw": 38, "ext_id": "9036"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 38, "mwh_is_estimate": true, "mwh": 38, "mwh_estimate": 38, "status": "planning", "status_class": "", "date_first_heard": "2021-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Maiden, Annfield Plain - Energy Storage", "name_short": "Maiden, Annfield Plain", "owner": "Stephenson Mohl Development", "state": "north east", "country": "uk", "lat": "54.848812", "long": "-1.732319", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.848812+-1.732319", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "city": "", "id": "483", "external_id": "9046", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Power Initiatives Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "483", "external_id": "9046", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "external_id": "9046", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 22, "power_mw": 22, "owner": "Power Initiatives Limited", "status": "planning", "date_first_heard": "2021-05-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.486707", "long": "-3.544179", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9046", "Record Last Updated (dd/mm/yyyy)": "20/05/2021", "Operator (or Applicant)": "Power Initiatives Limited", "Site Name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "22.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Barton Hill Industrial Park, Barton Hill Way, Torquay", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "TQ2 8JJ", "X-coordinate": "290550", "Y-coordinate": "66350", "Planning Authority": "Torbay Council", "Planning Application Reference": "P/2021/0345", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.486707", "long": "-3.544179", "status": "planning", "mw": 22, "ext_id": "9046"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9046", "Record Last Updated (dd/mm/yyyy)": "20/05/2021", "Operator (or Applicant)": "Power Initiatives Limited", "Site Name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "22.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Barton Hill Industrial Park, Barton Hill Way, Torquay", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "TQ2 8JJ", "X-coordinate": "290550", "Y-coordinate": "66350", "Planning Authority": "Torbay Council", "Planning Application Reference": "P/2021/0345", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.486707", "long": "-3.544179", "status": "planning", "mw": 22, "ext_id": "9046"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 22, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "planning", "status_class": "", "date_first_heard": "2021-05-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "name_short": "Barton Hill Industrial Park - Batte...", "owner": "Power Initiatives Limited", "state": "south west", "country": "uk", "lat": "50.486707", "long": "-3.544179", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.486707+-3.544179", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "city": "", "id": "484", "external_id": "9052", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "484", "external_id": "9052", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "external_id": "9052", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2022-07-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.030255", "long": "-3.054483", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9052", "Record Last Updated (dd/mm/yyyy)": "24/05/2021", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The North Of, National Grid Legacy Substation, Bronwylfa Road, Talwrn", "County": "Clwyd", "Region": "Wales", "Country": "Wales", "Post Code": "LL14 4HY", "X-coordinate": "329379", "Y-coordinate": "348628", "Planning Authority": "Wrexham County Borough Council", "Planning Application Reference": "P/2021/0441", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.030255", "long": "-3.054483", "status": "planning", "mw": 49, "ext_id": "9052"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2021", "to": "27/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "05/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "05/07/2027", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/07/2022", "to": "28/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "13768", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9052", "Record Last Updated (dd/mm/yyyy)": "28/04/2023", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13768", "Are they re-applying (Old REPD Ref) ": "", "Address": "The North Of, National Grid Legacy Substation, Bronwylfa Road, Talwrn", "County": "Clwyd", "Region": "Wales", "Country": "Wales", "Post Code": "LL14 4HY", "X-coordinate": "329379", "Y-coordinate": "348628", "Planning Authority": "Wrexham County Borough Council", "Planning Application Reference": "P/2021/0441", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/07/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.030255", "long": "-3.054483", "status": "planning", "mw": 49, "ext_id": "9052"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-07-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "name_short": "Bronwylfa Road, Talwrn", "owner": "Pelagic Energy", "state": "wales", "country": "uk", "lat": "53.030255", "long": "-3.054483", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.030255+-3.054483", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whaddon Lane, Hilperton", "city": "", "id": "485", "external_id": "9057", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "INRG", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "485", "external_id": "9057", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whaddon Lane, Hilperton", "external_id": "9057", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 18, "power_mw": 18, "owner": "British Solar Renewables", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.34745", "long": "-2.183478", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9057", "Record Last Updated (dd/mm/yyyy)": "24/05/2021", "Operator (or Applicant)": "INRG", "Site Name": "Whaddon Lane, Hilperton", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9056", "Installed Capacity (MWelec)": "18.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "west of Whaddon Farm, Whaddon Lane, Hilperton", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "BA14 6NR", "X-coordinate": "387318", "Y-coordinate": "160946", "Planning Authority": "North Wiltshire District Council", "Planning Application Reference": "PL/2021/03061", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.34745", "long": "-2.183478", "status": "planning", "mw": 18, "ext_id": "9057"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2021", "to": "27/04/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "06/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "29/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "INRG", "to": "British Solar Renewables", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9057", "Record Last Updated (dd/mm/yyyy)": "29/09/2023", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Whaddon Lane, Hilperton", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9056", "Installed Capacity (MWelec)": "18", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "west of Whaddon Farm, Whaddon Lane, Hilperton", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "BA14 6NR", "X-coordinate": "387318", "Y-coordinate": "160946", "Planning Authority": "North Wiltshire District Council", "Planning Application Reference": "PL/2021/03061", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.34745", "long": "-2.183478", "status": "planning", "mw": 18, "ext_id": "9057"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 18, "mwh_is_estimate": true, "mwh": 18, "mwh_estimate": 18, "status": "planning", "status_class": "", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whaddon Lane, Hilperton", "name_short": "Whaddon Lane, Hilperton", "owner": "British Solar Renewables", "state": "south west", "country": "uk", "lat": "51.34745", "long": "-2.183478", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.34745+-2.183478", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Purlieus Farm, Minety - Battery Storage Facility", "city": "", "id": "486", "external_id": "9063", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Minety South 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "486", "external_id": "9063", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Minety South 2 - Battery Storage Facility", "external_id": "9063", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2021-11-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.607952", "long": "-1.99767", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9063", "Record Last Updated (dd/mm/yyyy)": "25/05/2021", "Operator (or Applicant)": "Minety South 2", "Site Name": "Purlieus Farm, Minety - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Purlieus Farm, Minety, Malmesbury", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP", "X-coordinate": "400258", "Y-coordinate": "189902", "Planning Authority": "West Wiltshire District Council", "Planning Application Reference": "PL/2021/04151", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.607952", "long": "-1.99767", "status": "planning", "mw": 49, "ext_id": "9063"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/05/2021", "to": "08/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/11/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Site Name", "from": "Purlieus Farm, Minety - Battery Storage Facility", "to": "Minety South 2 - Battery Storage Facility", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "08/11/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Operator (or Applicant)", "from": "Minety South 2", "to": "Statera Energy", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9063", "Record Last Updated (dd/mm/yyyy)": "08/12/2021", "Operator (or Applicant)": "Statera Energy", "Site Name": "Minety South 2 - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Purlieus Farm, Minety, Malmesbury", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP", "X-coordinate": "400258", "Y-coordinate": "189902", "Planning Authority": "West Wiltshire District Council", "Planning Application Reference": "PL/2021/04151", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/11/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.607952", "long": "-1.99767", "status": "planning", "mw": 49, "ext_id": "9063"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-11-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Minety South 2 - Battery Storage Facility", "name_short": "Minety South 2", "owner": "Statera Energy", "state": "south west", "country": "uk", "lat": "51.607952", "long": "-1.99767", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.607952+-1.99767", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dragonhall Farm, Padanaram - Battery Storage", "city": "", "id": "487", "external_id": "9066", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecosse Solar Parks Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "487", "external_id": "9066", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dragonhall Farm, Padanaram - Battery Storage", "external_id": "9066", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Ecosse Solar Parks Limited", "status": "construction", "date_first_heard": "2021-12-02", "start_construction": "2022-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.653902", "long": "-2.939169", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9066", "Record Last Updated (dd/mm/yyyy)": "25/05/2021", "Operator (or Applicant)": "Ecosse Solar Parks Limited", "Site Name": "Dragonhall Farm, Padanaram - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9065", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Field 275M East Of Dragonhall Farm Padanaram Forfar ", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD8", "X-coordinate": "342517", "Y-coordinate": "751739", "Planning Authority": "Angus Council", "Planning Application Reference": "21/00271/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.653902", "long": "-2.939169", "status": "planning", "mw": 10, "ext_id": "9066"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/05/2021", "to": "02/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "02/12/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2022", "to": "30/10/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9066", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Ecosse Solar Parks Limited", "Site Name": "Dragonhall Farm, Padanaram - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9065", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Field 275M East Of Dragonhall Farm Padanaram Forfar ", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD8", "X-coordinate": "342517", "Y-coordinate": "751739", "Planning Authority": "Angus Council", "Planning Application Reference": "21/00271/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/06/2022", "Operational": "", "Heat Network Ref": "", "lat": "56.653902", "long": "-2.939169", "status": "construction", "mw": 10, "ext_id": "9066"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-25", "start_construction": "2022-03-02", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-12-02", "start_construction": "2022-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dragonhall Farm, Padanaram - Battery Storage", "name_short": "Dragonhall Farm, Padanaram", "owner": "Ecosse Solar Parks Limited", "state": "scotland", "country": "uk", "lat": "56.653902", "long": "-2.939169", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.653902+-2.939169", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "488", "external_id": "9115", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "SSE Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "488", "external_id": "9115", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane - Battery Storage Energy", "external_id": "9115", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "SSE Enterprise", "status": "planning", "date_first_heard": "2021-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.721298", "long": "-1.275862", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9115", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "SSE Enterprise", "Site Name": "Kirkhaw Lane - Battery Storage Energy", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Site Within Ferrybridge Power Station", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RB", "X-coordinate": "447882", "Y-coordinate": "425231", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02055/CPL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.721298", "long": "-1.275862", "status": "planning", "mw": 100, "ext_id": "9115"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9115", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "SSE Enterprise", "Site Name": "Kirkhaw Lane - Battery Storage Energy", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10022", "Are they re-applying (Old REPD Ref) ": "", "Address": "Site Within Ferrybridge Power Station", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RB", "X-coordinate": "447882", "Y-coordinate": "425231", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02055/CPL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.721298", "long": "-1.275862", "status": "planning", "mw": 100, "ext_id": "9115"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane - Battery Storage Energy", "name_short": "Kirkhaw Lane - Battery Storage", "owner": "SSE Enterprise", "state": "yorkshire and humber", "country": "uk", "lat": "53.721298", "long": "-1.275862", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.721298+-1.275862", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Daer Wind Farm", "city": "", "id": "490", "external_id": "9127", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "E.ON Climate & Renewables UK Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "490", "external_id": "9127", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Daer Wind Farm", "external_id": "9127", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "E.ON Climate & Renewables UK Developments", "status": "planning", "date_first_heard": "2021-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.337835", "long": "-3.578114", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9127", "Record Last Updated (dd/mm/yyyy)": "10/06/2021", "Operator (or Applicant)": "E.ON Climate & Renewables UK Developments", "Site Name": "Daer Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "2908", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land east of Daer Reservoir, South Lanarkshire/Dumfries and Galloway", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "300000", "Y-coordinate": "606000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "P/21/1014 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.337835", "long": "-3.578114", "status": "planning", "mw": 100, "ext_id": "9127"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Planning Application Reference", "from": "P/21/1014 ", "to": " ECU00000740", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9127", "Record Last Updated (dd/mm/yyyy)": "10/06/2021", "Operator (or Applicant)": "E.ON Climate & Renewables UK Developments", "Site Name": "Daer Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "2908", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land east of Daer Reservoir, South Lanarkshire/Dumfries and Galloway", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "300000", "Y-coordinate": "606000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00000740", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.337835", "long": "-3.578114", "status": "planning", "mw": 100, "ext_id": "9127"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Daer Wind Farm", "name_short": "Daer Wind Farm", "owner": "E.ON Climate & Renewables UK Developments", "state": "scotland", "country": "uk", "lat": "55.337835", "long": "-3.578114", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.337835+-3.578114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bay Gateway - Battery Storage Facility", "city": "", "id": "491", "external_id": "9199", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "491", "external_id": "9199", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bay Gateway - Battery Storage Facility", "external_id": "9199", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Energi Generation", "status": "planning", "date_first_heard": "2022-04-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.043208", "long": "-2.858281", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9199", "Record Last Updated (dd/mm/yyyy)": "16/07/2021", "Operator (or Applicant)": "Energi Generation", "Site Name": "Bay Gateway - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "North Of A683 Bay Gateway Heaton With Oxcliffe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3", "X-coordinate": "343895", "Y-coordinate": "461145", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/00695/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.043208", "long": "-2.858281", "status": "planning", "mw": 99, "ext_id": "9199"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/07/2021", "to": "27/06/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "26/04/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9199", "Record Last Updated (dd/mm/yyyy)": "27/06/2022", "Operator (or Applicant)": "Energi Generation", "Site Name": "Bay Gateway - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North Of A683 Bay Gateway Heaton With Oxcliffe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3", "X-coordinate": "343895", "Y-coordinate": "461145", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/00695/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.043208", "long": "-2.858281", "status": "planning", "mw": 99, "ext_id": "9199"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2022-04-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bay Gateway - Battery Storage Facility", "name_short": "Bay Gateway", "owner": "Energi Generation", "state": "north west", "country": "uk", "lat": "54.043208", "long": "-2.858281", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.043208+-2.858281", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "city": "", "id": "492", "external_id": "9224", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "492", "external_id": "9224", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "external_id": "9224", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Tag Energy UK", "status": "construction", "date_first_heard": "2021-09-03", "start_construction": "2022-09-12", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.207527", "long": "-3.20333", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9224", "Record Last Updated (dd/mm/yyyy)": "25/06/2021", "Operator (or Applicant)": "RES Limited", "Site Name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "E/O Balsillie Avenue, The S/O The Limekilns, Glenrothes", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY12 7DR", "X-coordinate": "325452", "Y-coordinate": "702311", "Planning Authority": "Fife Council", "Planning Application Reference": "21/01438/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.207527", "long": "-3.20333", "status": "planning", "mw": 19, "ext_id": "9224"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2021", "to": "18/11/2021", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "RES Limited", "to": "Tag Energy UK", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "03/09/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/11/2021", "to": "15/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/09/2024", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "12/09/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9224", "Record Last Updated (dd/mm/yyyy)": "15/09/2022", "Operator (or Applicant)": "Tag Energy UK", "Site Name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7989", "Address": "E/O Balsillie Avenue, The S/O The Limekilns, Glenrothes", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY12 7DR", "X-coordinate": "325452", "Y-coordinate": "702311", "Planning Authority": "Fife Council", "Planning Application Reference": "21/01438/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/09/2024", "Under Construction": "12/09/2022", "Operational": "", "Heat Network Ref": "", "lat": "56.207527", "long": "-3.20333", "status": "construction", "mw": 19, "ext_id": "9224"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-25", "start_construction": "2022-09-15", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-09-03", "start_construction": "2022-09-12", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "name_short": "Balsillie Avenue - Roaring Hill Ene...", "owner": "Tag Energy UK", "state": "scotland", "country": "uk", "lat": "56.207527", "long": "-3.20333", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.207527+-3.20333", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Forest Gate - Solar Farm & Battery Storage", "city": "", "id": "493", "external_id": "9230", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "493", "external_id": "9230", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Forest Gate - Solar Farm & Battery Storage", "external_id": "9230", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Eden Renewables", "status": "planning", "date_first_heard": "2023-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.442907", "long": "-2.076784", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9230", "Record Last Updated (dd/mm/yyyy)": "28/06/2021", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Forest Gate - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9229", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Forest Gate, Pewsham, Chippenham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN15 3RS", "X-coordinate": "394760", "Y-coordinate": "171549", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2021/06112", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.442907", "long": "-2.076784", "status": "planning", "mw": 40, "ext_id": "9230"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/06/2021", "to": "14/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "10/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "10/03/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2023", "to": "28/06/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9230", "Record Last Updated (dd/mm/yyyy)": "28/06/2021", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Forest Gate - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9229", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Forest Gate, Pewsham, Chippenham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN15 3RS", "X-coordinate": "394760", "Y-coordinate": "171549", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2021/06112", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.442907", "long": "-2.076784", "status": "planning", "mw": 40, "ext_id": "9230"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Forest Gate - Solar Farm & Battery Storage", "name_short": "Forest Gate - Solar Farm &", "owner": "Eden Renewables", "state": "south west", "country": "uk", "lat": "51.442907", "long": "-2.076784", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.442907+-2.076784", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Leigh Delamere - Solar farm & Battery storage", "city": "", "id": "494", "external_id": "9238", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "494", "external_id": "9238", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Leigh Delamere - Solar farm & Battery storage", "external_id": "9238", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Eden Renewables", "status": "planning", "date_first_heard": "2022-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.508795", "long": "-2.171591", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9238", "Record Last Updated (dd/mm/yyyy)": "29/06/2021", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Leigh Delamere - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9237", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The S/O The M4 At Leigh Delamere, To The W/O Leigh, Delamere Motorway Services, Chippenham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14", "X-coordinate": "388188", "Y-coordinate": "178888", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2021/06100", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.508795", "long": "-2.171591", "status": "planning", "mw": 40, "ext_id": "9238"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/06/2021", "to": "01/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "11/08/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/08/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9238", "Record Last Updated (dd/mm/yyyy)": "01/09/2022", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Leigh Delamere - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9237", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The S/O The M4 At Leigh Delamere, To The W/O Leigh, Delamere Motorway Services, Chippenham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14", "X-coordinate": "388188", "Y-coordinate": "178888", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2021/06100", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.508795", "long": "-2.171591", "status": "planning", "mw": 40, "ext_id": "9238"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Leigh Delamere - Solar farm & Battery storage", "name_short": "Leigh Delamere - Solar farm &", "owner": "Eden Renewables", "state": "south west", "country": "uk", "lat": "51.508795", "long": "-2.171591", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.508795+-2.171591", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Fambridge Hall - Solar farm & Battery storage", "city": "", "id": "495", "external_id": "9274", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "495", "external_id": "9274", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Fambridge Hall - Solar farm & Battery storage", "external_id": "9274", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "British Solar Renewables / BayWa r.e. UK Limited", "status": "planning", "date_first_heard": "2021-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.627529", "long": "0.688668", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9274", "Record Last Updated (dd/mm/yyyy)": "05/07/2021", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "South Fambridge Hall - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9273", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "South Fambridge Hall, Fambridge Road, South Fambridge, Rochford", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS4 3LS", "X-coordinate": "586193", "Y-coordinate": "195503", "Planning Authority": "Rochford District Council", "Planning Application Reference": "21/00605/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.627529", "long": "0.688668", "status": "planning", "mw": 20, "ext_id": "9274"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/07/2021", "to": "22/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2021", "to": "05/08/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "British Solar Renewables", "to": "British Solar Renewables / BayWa r.e. UK Limited", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/12/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/08/2022", "to": "17/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9274", "Record Last Updated (dd/mm/yyyy)": "17/11/2022", "Operator (or Applicant)": "British Solar Renewables / BayWa r.e. UK Limited", "Site Name": "South Fambridge Hall - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9273", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Fambridge Hall, Fambridge Road, South Fambridge, Rochford", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS4 3LS", "X-coordinate": "586193", "Y-coordinate": "195503", "Planning Authority": "Rochford District Council", "Planning Application Reference": "21/00605/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.627529", "long": "0.688668", "status": "planning", "mw": 20, "ext_id": "9274"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Fambridge Hall - Solar farm & Battery storage", "name_short": "South Fambridge Hall - Solar farm &", "owner": "British Solar Renewables / BayWa r.e. UK Limited", "state": "eastern", "country": "uk", "lat": "51.627529", "long": "0.688668", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.627529+0.688668", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Weirs Drove, Burwell - Battery Storage Facility", "city": "", "id": "496", "external_id": "9292", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Fen Power 1 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "496", "external_id": "9292", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Weirs Drove, Burwell - Battery Storage Facility", "external_id": "9292", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Fen Power 1 Limited", "status": "planning", "date_first_heard": "2021-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.274443", "long": "0.314426", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9292", "Record Last Updated (dd/mm/yyyy)": "06/07/2021", "Operator (or Applicant)": "Fen Power 1 Limited", "Site Name": "Weirs Drove, Burwell - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land North Of Electricity Sub-Station Weirs Drove Burwell, Cambridge", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0BP", "X-coordinate": "558004", "Y-coordinate": "266555", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "21/00816/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.274443", "long": "0.314426", "status": "planning", "mw": 30, "ext_id": "9292"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9292", "Record Last Updated (dd/mm/yyyy)": "06/07/2021", "Operator (or Applicant)": "Fen Power 1 Limited", "Site Name": "Weirs Drove, Burwell - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7272", "Address": "Land North Of Electricity Sub-Station Weirs Drove Burwell, Cambridge", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0BP", "X-coordinate": "558004", "Y-coordinate": "266555", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "21/00816/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.274443", "long": "0.314426", "status": "planning", "mw": 30, "ext_id": "9292"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2021-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Weirs Drove, Burwell - Battery Storage Facility", "name_short": "Weirs Drove, Burwell", "owner": "Fen Power 1 Limited", "state": "eastern", "country": "uk", "lat": "52.274443", "long": "0.314426", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.274443+0.314426", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sundon Substation - 49.9MW Battery Storage", "city": "", "id": "497", "external_id": "9315", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "497", "external_id": "9315", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sundon Substation ", "external_id": "9315", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2022-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.931115", "long": "-0.498819", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9315", "Record Last Updated (dd/mm/yyyy)": "16/07/2021", "Operator (or Applicant)": "Pivot Power", "Site Name": "Sundon Substation - 49.9MW Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Adj National Grid Sundon Substation, Water End Lane, Chalton", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ", "X-coordinate": "503312", "Y-coordinate": "226909", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/21/02829/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.931115", "long": "-0.498819", "status": "planning", "mw": 49, "ext_id": "9315"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/07/2021", "to": "30/03/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Sundon Substation - 49.9MW Battery Storage", "to": "Sundon Substation ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/01/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "26/01/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9315", "Record Last Updated (dd/mm/yyyy)": "30/03/2022", "Operator (or Applicant)": "Pivot Power", "Site Name": "Sundon Substation ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7283", "Address": "Adj National Grid Sundon Substation, Water End Lane, Chalton", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ", "X-coordinate": "503312", "Y-coordinate": "226909", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/21/02829/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/01/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.931115", "long": "-0.498819", "status": "planning", "mw": 49, "ext_id": "9315"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sundon Substation ", "name_short": "Sundon Substation ", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "51.931115", "long": "-0.498819", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.931115+-0.498819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "city": "", "id": "498", "external_id": "9340", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "P3P Partners LLP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "498", "external_id": "9340", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "external_id": "9340", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "P3P Partners LLP", "status": "planning", "date_first_heard": "2021-07-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.804571", "long": "-2.214196", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9340", "Record Last Updated (dd/mm/yyyy)": "22/07/2021", "Operator (or Applicant)": "P3P Partners LLP", "Site Name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Balderstone Lane, Burnley", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB10 2TJ", "X-coordinate": "385991", "Y-coordinate": "434274", "Planning Authority": "Burnley Borough Council", "Planning Application Reference": "FUL/2021/0375", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.804571", "long": "-2.214196", "status": "planning", "mw": 70, "ext_id": "9340"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9340", "Record Last Updated (dd/mm/yyyy)": "22/07/2021", "Operator (or Applicant)": "P3P Partners LLP", "Site Name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Balderstone Lane, Burnley", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB10 2TJ", "X-coordinate": "385991", "Y-coordinate": "434274", "Planning Authority": "Burnley Borough Council", "Planning Application Reference": "FUL/2021/0375", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.804571", "long": "-2.214196", "status": "planning", "mw": 70, "ext_id": "9340"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2021-07-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "name_short": "Widow Hill, Balderstone Lane - Batt...", "owner": "P3P Partners LLP", "state": "north west", "country": "uk", "lat": "53.804571", "long": "-2.214196", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.804571+-2.214196", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grendon Lakes - Battery Storage", "city": "", "id": "499", "external_id": "9341", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "499", "external_id": "9341", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grendon Lakes - Battery Storage", "external_id": "9341", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.243607", "long": "-0.723363", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9341", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10955", "Are they re-applying (Old REPD Ref) ": "", "Address": "Grendon Lakes, Main Road, Grendon, Northampton", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW", "X-coordinate": "487263", "Y-coordinate": "261370", "Planning Authority": "North Northamptonshire Council", "Planning Application Reference": "NW/21/00623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "30/09/2021", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.243607", "long": "-0.723363", "status": "planning", "mw": 49, "ext_id": "9341"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9341", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10955", "Are they re-applying (Old REPD Ref) ": "", "Address": "Grendon Lakes, Main Road, Grendon, Northampton", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW", "X-coordinate": "487263", "Y-coordinate": "261370", "Planning Authority": "North Northamptonshire Council", "Planning Application Reference": "NW/21/00623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "30/09/2021", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.243607", "long": "-0.723363", "status": "planning", "mw": 49, "ext_id": "9341"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grendon Lakes - Battery Storage", "name_short": "Grendon Lakes", "owner": "Statera Energy", "state": "east midlands", "country": "uk", "lat": "52.243607", "long": "-0.723363", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.243607+-0.723363", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "city": "", "id": "501", "external_id": "9346", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Namene Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "501", "external_id": "9346", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "external_id": "9346", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Namene Solar", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.761107", "long": "0.398536", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9346", "Record Last Updated (dd/mm/yyyy)": "22/07/2021", "Operator (or Applicant)": "Namene Solar", "Site Name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9345", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Estuary Farm, Edward Benefer Way, Kings Lynn", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE30 2HY", "X-coordinate": "561943", "Y-coordinate": "320864", "Planning Authority": "Borough Council of King\ufffds Lynn & West Norfolk", "Planning Application Reference": "21/01432/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.761107", "long": "0.398536", "status": "planning", "mw": 15, "ext_id": "9346"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/07/2021", "to": "15/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "08/12/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Borough Council of King\ufffds Lynn & West Norfolk", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9346", "Record Last Updated (dd/mm/yyyy)": "15/12/2021", "Operator (or Applicant)": "Namene Solar", "Site Name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9345", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Estuary Farm, Edward Benefer Way, Kings Lynn", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE30 2HY", "X-coordinate": "561943", "Y-coordinate": "320864", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "21/01432/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.761107", "long": "0.398536", "status": "planning", "mw": 15, "ext_id": "9346"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "name_short": "Estuary Farm, Edward Benefer Way - ...", "owner": "Namene Solar", "state": "eastern", "country": "uk", "lat": "52.761107", "long": "0.398536", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.761107+0.398536", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Capenhurst Lane, Capenhurst - Battery storage", "city": "", "id": "503", "external_id": "9377", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "HD888CAP Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "503", "external_id": "9377", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Capenhurst Lane, Capenhurst - Battery storage", "external_id": "9377", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "HD888CAP Limited", "status": "construction", "date_first_heard": "2021-10-21", "start_construction": "2022-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.267902", "long": "-2.950312", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9377", "Record Last Updated (dd/mm/yyyy)": "03/08/2021", "Operator (or Applicant)": "HD888CAP Limited", "Site Name": "Capenhurst Lane, Capenhurst - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Capenhurst Lane Capenhurst Chester", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH1 6EH", "X-coordinate": "336716", "Y-coordinate": "374967", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "21/02404/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.267902", "long": "-2.950312", "status": "planning", "mw": 57, "ext_id": "9377"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/08/2021", "to": "15/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/10/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/10/2024", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/09/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9377", "Record Last Updated (dd/mm/yyyy)": "15/09/2022", "Operator (or Applicant)": "HD888CAP Limited", "Site Name": "Capenhurst Lane, Capenhurst - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Capenhurst Lane Capenhurst Chester", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH1 6EH", "X-coordinate": "336716", "Y-coordinate": "374967", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "21/02404/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/10/2024", "Under Construction": "01/09/2022", "Operational": "", "Heat Network Ref": "", "lat": "53.267902", "long": "-2.950312", "status": "construction", "mw": 57, "ext_id": "9377"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-03", "start_construction": "2022-09-15", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-10-21", "start_construction": "2022-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Capenhurst Lane, Capenhurst - Battery storage", "name_short": "Capenhurst Lane, Capenhurst", "owner": "HD888CAP Limited", "state": "north west", "country": "uk", "lat": "53.267902", "long": "-2.950312", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.267902+-2.950312", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stainland Road, Salterhebble - Battery Storage Facility", "city": "", "id": "504", "external_id": "9397", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "North Deane Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "504", "external_id": "9397", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stainland Road, Salterhebble - Battery Storage Facility", "external_id": "9397", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "North Deane Generation Limited", "status": "planning", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.696047", "long": "-1.856009", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9397", "Record Last Updated (dd/mm/yyyy)": "06/08/2021", "Operator (or Applicant)": "North Deane Generation Limited", "Site Name": "Stainland Road, Salterhebble - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "South Of Sub Station Stainland Road Elland Calderdale", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX4 8LR", "X-coordinate": "409605", "Y-coordinate": "422188", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "21/00839/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.696047", "long": "-1.856009", "status": "planning", "mw": 25, "ext_id": "9397"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/08/2021", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/09/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/09/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9397", "Record Last Updated (dd/mm/yyyy)": "13/12/2021", "Operator (or Applicant)": "North Deane Generation Limited", "Site Name": "Stainland Road, Salterhebble - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Sub Station Stainland Road Elland Calderdale", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX4 8LR", "X-coordinate": "409605", "Y-coordinate": "422188", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "21/00839/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.696047", "long": "-1.856009", "status": "planning", "mw": 25, "ext_id": "9397"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stainland Road, Salterhebble - Battery Storage Facility", "name_short": "Stainland Road, Salterhebble", "owner": "North Deane Generation Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.696047", "long": "-1.856009", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.696047+-1.856009", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dunton Hall - Battery Energy Storage System", "city": "", "id": "505", "external_id": "9427", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "Welbar Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "505", "external_id": "9427", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dunton Hall - Battery Energy Storage System", "external_id": "9427", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 349, "power_mw": 349, "owner": "Welbar Energy Storage Limited", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.53587", "long": "-1.715317", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9427", "Record Last Updated (dd/mm/yyyy)": "13/08/2021", "Operator (or Applicant)": "Welbar Energy Storage Limited", "Site Name": "Dunton Hall - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "East & Se/O Dunton Hall, Kingsbury Road, Curdworth, Sutton Coldfield", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B76 0BL", "X-coordinate": "419407", "Y-coordinate": "293150", "Planning Authority": "North Warwickshire Borough Council", "Planning Application Reference": "PAP/2021/0473", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.53587", "long": "-1.715317", "status": "planning", "mw": 349, "ext_id": "9427"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/08/2021", "to": "08/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "04/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/03/2022", "to": "17/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "04/03/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9427", "Record Last Updated (dd/mm/yyyy)": "17/05/2022", "Operator (or Applicant)": "Welbar Energy Storage Limited", "Site Name": "Dunton Hall - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East & Se/O Dunton Hall, Kingsbury Road, Curdworth, Sutton Coldfield", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B76 0BL", "X-coordinate": "419407", "Y-coordinate": "293150", "Planning Authority": "North Warwickshire Borough Council", "Planning Application Reference": "PAP/2021/0473", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.53587", "long": "-1.715317", "status": "planning", "mw": 349, "ext_id": "9427"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 349, "mwh_is_estimate": true, "mwh": 349, "mwh_estimate": 349, "status": "planning", "status_class": "", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dunton Hall - Battery Energy Storage System", "name_short": "Dunton Hall - Battery", "owner": "Welbar Energy Storage Limited", "state": "west midlands", "country": "uk", "lat": "52.53587", "long": "-1.715317", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.53587+-1.715317", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Admiralty Road - Battery Energy Storage Facility", "city": "", "id": "506", "external_id": "9470", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "BAT-NR30 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "506", "external_id": "9470", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Admiralty Road - Battery Energy Storage Facility", "external_id": "9470", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "BAT-NR30 Limited", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.58588", "long": "1.731579", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9470", "Record Last Updated (dd/mm/yyyy)": "23/08/2021", "Operator (or Applicant)": "BAT-NR30 Limited", "Site Name": "Admiralty Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "South & E/o Admiralty Road, South Denes, Great Yarmouth", "County": "Norfolk ", "Region": "Eastern", "Country": "England", "Post Code": "NR30 3QR", "X-coordinate": "652875", "Y-coordinate": "305216", "Planning Authority": "Great Yarmouth Borough Council", "Planning Application Reference": "06/21/0672/LDO", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.58588", "long": "1.731579", "status": "planning", "mw": 49, "ext_id": "9470"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "County", "from": "Norfolk ", "to": "Norfolk", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9470", "Record Last Updated (dd/mm/yyyy)": "23/08/2021", "Operator (or Applicant)": "BAT-NR30 Limited", "Site Name": "Admiralty Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South & E/o Admiralty Road, South Denes, Great Yarmouth", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR30 3QR", "X-coordinate": "652875", "Y-coordinate": "305216", "Planning Authority": "Great Yarmouth Borough Council", "Planning Application Reference": "06/21/0672/LDO", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.58588", "long": "1.731579", "status": "planning", "mw": 49, "ext_id": "9470"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Admiralty Road - Battery Energy Storage Facility", "name_short": "Admiralty Road - Battery Energy", "owner": "BAT-NR30 Limited", "state": "eastern", "country": "uk", "lat": "52.58588", "long": "1.731579", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.58588+1.731579", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Caldwell Road - Battery Storage", "city": "", "id": "508", "external_id": "9507", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Aura Power BESS Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "508", "external_id": "9507", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Caldwell Road - Battery Storage", "external_id": "9507", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 90, "power_mw": 90, "owner": "Infrared Capital Partners Limited", "status": "planning", "date_first_heard": "2022-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.768556", "long": "-1.626224", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9507", "Record Last Updated (dd/mm/yyyy)": "31/08/2021", "Operator (or Applicant)": "Aura Power BESS Ltd", "Site Name": "Caldwell Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "90.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O The Royle Farm Business Park, Caldwell Road, Burton on Trent", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE15 9TU", "X-coordinate": "425316", "Y-coordinate": "319061", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "DMPA/2021/1221", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.768556", "long": "-1.626224", "status": "planning", "mw": 90, "ext_id": "9507"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/08/2021", "to": "19/04/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "03/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/03/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2022", "to": "04/11/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Aura Power BESS Ltd", "to": "Infrared Capital Partners Limited", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9507", "Record Last Updated (dd/mm/yyyy)": "04/11/2022", "Operator (or Applicant)": "Infrared Capital Partners Limited", "Site Name": "Caldwell Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "90", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O The Royle Farm Business Park, Caldwell Road, Burton on Trent", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE15 9TU", "X-coordinate": "425316", "Y-coordinate": "319061", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "DMPA/2021/1221", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.768556", "long": "-1.626224", "status": "planning", "mw": 90, "ext_id": "9507"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 90, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "planning", "status_class": "", "date_first_heard": "2022-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Caldwell Road - Battery Storage", "name_short": "Caldwell Road", "owner": "Infrared Capital Partners Limited", "state": "east midlands", "country": "uk", "lat": "52.768556", "long": "-1.626224", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.768556+-1.626224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Heysham Energy Storage Project", "city": "", "id": "510", "external_id": "9545", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Kona Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "510", "external_id": "9545", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Heysham Energy Storage Project", "external_id": "9545", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Kona Energy Limited", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.036015", "long": "-2.885953", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9545", "Record Last Updated (dd/mm/yyyy)": "07/09/2021", "Operator (or Applicant)": "Kona Energy Limited", "Site Name": "Heysham Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O A683 Lancaster, Morecambe Bypass, Morecambe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 2FQ", "X-coordinate": "342073", "Y-coordinate": "460367", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/01069/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.036015", "long": "-2.885953", "status": "planning", "mw": 200, "ext_id": "9545"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/09/2021", "to": "30/05/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "27/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "26/05/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9545", "Record Last Updated (dd/mm/yyyy)": "30/05/2022", "Operator (or Applicant)": "Kona Energy Limited", "Site Name": "Heysham Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O A683 Lancaster, Morecambe Bypass, Morecambe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 2FQ", "X-coordinate": "342073", "Y-coordinate": "460367", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/01069/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.036015", "long": "-2.885953", "status": "planning", "mw": 200, "ext_id": "9545"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Heysham Energy Storage Project", "name_short": "Heysham", "owner": "Kona Energy Limited", "state": "north west", "country": "uk", "lat": "54.036015", "long": "-2.885953", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.036015+-2.885953", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Davies Road - Battery Storage", "city": "", "id": "512", "external_id": "9563", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "512", "external_id": "9563", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Davies Road - Battery Storage", "external_id": "9563", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Energi Generation", "status": "planning", "date_first_heard": "2022-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.753952", "long": "-2.445402", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9563", "Record Last Updated (dd/mm/yyyy)": "09/09/2021", "Operator (or Applicant)": "Energi Generation", "Site Name": "Davies Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Davies Road, Blackburn", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB1 3HR", "X-coordinate": "370729", "Y-coordinate": "428713", "Planning Authority": "Hyndburn Borough Council", "Planning Application Reference": "11/21/0483", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.753952", "long": "-2.445402", "status": "planning", "mw": 25, "ext_id": "9563"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/09/2021", "to": "18/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "17/03/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9563", "Record Last Updated (dd/mm/yyyy)": "18/03/2022", "Operator (or Applicant)": "Energi Generation", "Site Name": "Davies Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Davies Road, Blackburn", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB1 3HR", "X-coordinate": "370729", "Y-coordinate": "428713", "Planning Authority": "Hyndburn Borough Council", "Planning Application Reference": "11/21/0483", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.753952", "long": "-2.445402", "status": "planning", "mw": 25, "ext_id": "9563"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Davies Road - Battery Storage", "name_short": "Davies Road", "owner": "Energi Generation", "state": "north west", "country": "uk", "lat": "53.753952", "long": "-2.445402", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.753952+-2.445402", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "city": "", "id": "513", "external_id": "9565", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Cheshire East Council", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "513", "external_id": "9565", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "external_id": "9565", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Cheshire East Council", "status": "planning", "date_first_heard": "2022-03-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.1122", "long": "-2.416299", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9565", "Record Last Updated (dd/mm/yyyy)": "09/09/2021", "Operator (or Applicant)": "Cheshire East Council", "Site Name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8522", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land Adjacent Councils Composting Plant, Middlewich Road, Crewe", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW1 5NG", "X-coordinate": "372231", "Y-coordinate": "357305", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "21/4490N", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.1122", "long": "-2.416299", "status": "planning", "mw": 25, "ext_id": "9565"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/09/2021", "to": "17/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "11/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "11/03/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9565", "Record Last Updated (dd/mm/yyyy)": "17/03/2022", "Operator (or Applicant)": "Cheshire East Council", "Site Name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8522", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent Councils Composting Plant, Middlewich Road, Crewe", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW1 5NG", "X-coordinate": "372231", "Y-coordinate": "357305", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "21/4490N", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.1122", "long": "-2.416299", "status": "planning", "mw": 25, "ext_id": "9565"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-03-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "name_short": "Middlewich Road - Solar Photovoltai...", "owner": "Cheshire East Council", "state": "north west", "country": "uk", "lat": "53.1122", "long": "-2.416299", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.1122+-2.416299", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Astra Centre, Royal Barn Road - Energy Storage", "city": "", "id": "514", "external_id": "9584", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Arlington Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "514", "external_id": "9584", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Astra Centre, Royal Barn Road - Energy Storage", "external_id": "9584", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Arlington Energy Limited", "status": "planning", "date_first_heard": "2022-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.596617", "long": "-2.178949", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9584", "Record Last Updated (dd/mm/yyyy)": "13/09/2021", "Operator (or Applicant)": "Arlington Energy Limited", "Site Name": "Astra Centre, Royal Barn Road - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "R/o Astra Centre, Royal Barn Road, Rochdale", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 3DT", "X-coordinate": "388254", "Y-coordinate": "411131", "Planning Authority": "Rochdale borough Council", "Planning Application Reference": "21/01098/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.596617", "long": "-2.178949", "status": "planning", "mw": 40, "ext_id": "9584"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Planning Authority", "from": "Rochdale borough Council", "to": "Rochdale Borough Council", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/09/2021", "to": "24/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "10/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "10/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2022", "to": "05/07/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9584", "Record Last Updated (dd/mm/yyyy)": "05/07/2023", "Operator (or Applicant)": "Arlington Energy Limited", "Site Name": "Astra Centre, Royal Barn Road - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "R/o Astra Centre, Royal Barn Road, Rochdale", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 3DT", "X-coordinate": "388254", "Y-coordinate": "411131", "Planning Authority": "Rochdale Borough Council", "Planning Application Reference": "21/01098/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.596617", "long": "-2.178949", "status": "planning", "mw": 40, "ext_id": "9584"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Astra Centre, Royal Barn Road - Energy Storage", "name_short": "Astra Centre, Royal Barn Road", "owner": "Arlington Energy Limited", "state": "north west", "country": "uk", "lat": "53.596617", "long": "-2.178949", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.596617+-2.178949", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Winterton Road - Battery Energy Storage", "city": "", "id": "515", "external_id": "9608", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "95", "power_mw": "95", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "515", "external_id": "9608", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Winterton Road - Battery Energy Storage", "external_id": "9608", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 95, "power_mw": 95, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2022-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.597192", "long": "-0.64123", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9608", "Record Last Updated (dd/mm/yyyy)": "15/09/2021", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Winterton Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "95.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O Gala Bingo, Winterton Road, Scunthorpe", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN15 0DH", "X-coordinate": "490022", "Y-coordinate": "412038", "Planning Authority": "North Lincolnshire Council", "Planning Application Reference": "PA/2021/1291", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.597192", "long": "-0.64123", "status": "planning", "mw": 95, "ext_id": "9608"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2021", "to": "25/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/12/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/01/2023", "to": "15/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9608", "Record Last Updated (dd/mm/yyyy)": "15/09/2021", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Winterton Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "95", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Gala Bingo, Winterton Road, Scunthorpe", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN15 0DH", "X-coordinate": "490022", "Y-coordinate": "412038", "Planning Authority": "North Lincolnshire Council", "Planning Application Reference": "PA/2021/1291", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.597192", "long": "-0.64123", "status": "planning", "mw": 95, "ext_id": "9608"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 95, "mwh_is_estimate": true, "mwh": 95, "mwh_estimate": 95, "status": "planning", "status_class": "", "date_first_heard": "2022-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Winterton Road - Battery Energy Storage", "name_short": "Winterton Road", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.597192", "long": "-0.64123", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.597192+-0.64123", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bredbury Substation - Battery Storage Facility", "city": "", "id": "517", "external_id": "9653", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "517", "external_id": "9653", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bredbury Substation - Battery Storage Facility", "external_id": "9653", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Private Developer", "status": "construction", "date_first_heard": "2023-02-28", "start_construction": "2023-03-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.413834", "long": "-2.133873", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9653", "Record Last Updated (dd/mm/yyyy)": "20/09/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "Bredbury Substation - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Bredbury Substation, Stockport Road West, Bredbury, Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BP", "X-coordinate": "391199", "Y-coordinate": "390789", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/082085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.413834", "long": "-2.133873", "status": "planning", "mw": 49, "ext_id": "9653"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/09/2021", "to": "11/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/03/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2023", "to": "20/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9653", "Record Last Updated (dd/mm/yyyy)": "20/09/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "Bredbury Substation - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bredbury Substation, Stockport Road West, Bredbury, Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BP", "X-coordinate": "391199", "Y-coordinate": "390789", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/082085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "01/03/2023", "Operational": "", "Heat Network Ref": "", "lat": "53.413834", "long": "-2.133873", "status": "construction", "mw": 49, "ext_id": "9653"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-20", "start_construction": "2023-04-11", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-02-28", "start_construction": "2023-03-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bredbury Substation - Battery Storage Facility", "name_short": "Bredbury Substation", "owner": "Private Developer", "state": "north west", "country": "uk", "lat": "53.413834", "long": "-2.133873", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.413834+-2.133873", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Brickmakers Arms Battery", "city": "", "id": "518", "external_id": "9668", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "FPC Industry & Enterprise 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "518", "external_id": "9668", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Brickmakers Arms Battery", "external_id": "9668", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "FPC Industry & Enterprise 2 Limited", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.096646", "long": "-0.510744", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9668", "Record Last Updated (dd/mm/yyyy)": "21/09/2021", "Operator (or Applicant)": "FPC Industry & Enterprise 2 Limited", "Site Name": "The Brickmakers Arms Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The Brickmakers Arms Ph Woburn Road, Kempston Hardwick Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK43 9AH", "X-coordinate": "502115", "Y-coordinate": "245302", "Planning Authority": "Bedford Borough Council", "Planning Application Reference": "21/00300/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.096646", "long": "-0.510744", "status": "planning", "mw": 20, "ext_id": "9668"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/09/2021", "to": "05/01/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "22/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "22/12/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9668", "Record Last Updated (dd/mm/yyyy)": "05/01/2022", "Operator (or Applicant)": "FPC Industry & Enterprise 2 Limited", "Site Name": "The Brickmakers Arms Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The Brickmakers Arms Ph Woburn Road, Kempston Hardwick Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK43 9AH", "X-coordinate": "502115", "Y-coordinate": "245302", "Planning Authority": "Bedford Borough Council", "Planning Application Reference": "21/00300/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.096646", "long": "-0.510744", "status": "planning", "mw": 20, "ext_id": "9668"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Brickmakers Arms Battery", "name_short": "The Brickmakers Arms Battery", "owner": "FPC Industry & Enterprise 2 Limited", "state": "eastern", "country": "uk", "lat": "52.096646", "long": "-0.510744", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.096646+-0.510744", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Third Energy UK Gas Limited - Battery Energy Storage", "city": "", "id": "519", "external_id": "9691", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Third Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "519", "external_id": "9691", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Third Energy UK Gas Limited - Battery Energy Storage", "external_id": "9691", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Third Energy", "status": "planning", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.181338", "long": "-0.641704", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9691", "Record Last Updated (dd/mm/yyyy)": "23/09/2021", "Operator (or Applicant)": "Third Energy", "Site Name": "Third Energy UK Gas Limited - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Third Energy Uk Gas Limited, Malton Road, West Knapton, Malton", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO17 8JF", "X-coordinate": "488746", "Y-coordinate": "477025", "Planning Authority": "Ryedale District Council", "Planning Application Reference": "21/01220/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.181338", "long": "-0.641704", "status": "planning", "mw": 100, "ext_id": "9691"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/09/2021", "to": "25/10/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "14/10/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/10/2021", "to": "10/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "14/10/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/05/2022", "to": "27/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/10/2022", "to": "06/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9691", "Record Last Updated (dd/mm/yyyy)": "06/03/2023", "Operator (or Applicant)": "Third Energy", "Site Name": "Third Energy UK Gas Limited - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Third Energy Uk Gas Limited, Malton Road, West Knapton, Malton", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO17 8JF", "X-coordinate": "488746", "Y-coordinate": "477025", "Planning Authority": "Ryedale District Council", "Planning Application Reference": "21/01220/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/10/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/10/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.181338", "long": "-0.641704", "status": "planning", "mw": 100, "ext_id": "9691"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Third Energy UK Gas Limited - Battery Energy Storage", "name_short": "Third Energy UK Gas Limited", "owner": "Third Energy", "state": "yorkshire and humber", "country": "uk", "lat": "54.181338", "long": "-0.641704", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.181338+-0.641704", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)", "city": "", "id": "520", "external_id": "9708", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "520", "external_id": "9708", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tanners Lane - Battery Energy Storage Facility (Phase One)", "external_id": "9708", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "British Solar Renewables", "status": "planning", "date_first_heard": "2019-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.832089", "long": "-1.189601", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9708", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Newlands Farm Tanners Lane Fareham", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO14 1BL", "X-coordinate": "457168", "Y-coordinate": "103930", "Planning Authority": "Fareham Borough Council", "Planning Application Reference": "P/19/1019/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.832089", "long": "-1.189601", "status": "planning", "mw": 40, "ext_id": "9708"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2021", "to": "07/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Site Name", "from": "Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)", "to": "Tanners Lane - Battery Energy Storage Facility (Phase One)", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "26/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9708", "Record Last Updated (dd/mm/yyyy)": "07/04/2022", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Tanners Lane - Battery Energy Storage Facility (Phase One)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newlands Farm Tanners Lane Fareham", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO14 1BL", "X-coordinate": "457168", "Y-coordinate": "103930", "Planning Authority": "Fareham Borough Council", "Planning Application Reference": "P/19/1019/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.832089", "long": "-1.189601", "status": "planning", "mw": 40, "ext_id": "9708"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2019-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tanners Lane - Battery Energy Storage Facility (Phase One)", "name_short": "Tanners Lane - Battery Energy Stor...", "owner": "British Solar Renewables", "state": "south east", "country": "uk", "lat": "50.832089", "long": "-1.189601", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.832089+-1.189601", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cholmondeley Road - Battery Storage", "city": "", "id": "522", "external_id": "9763", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Riverside Estates (NW) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "522", "external_id": "9763", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cholmondeley Road - Battery Storage", "external_id": "9763", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Riverside Estates (NW) Limited", "status": "planning", "date_first_heard": "2022-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.313681", "long": "-2.714938", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9763", "Record Last Updated (dd/mm/yyyy)": "07/10/2021", "Operator (or Applicant)": "Riverside Estates (NW) Limited", "Site Name": "Cholmondeley Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The South East Of Junction Between Weaver View And Cholmondeley Road Runcorn", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA7 4XU", "X-coordinate": "352465", "Y-coordinate": "379877", "Planning Authority": "Halton Borough Council", "Planning Application Reference": "21/00565/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.313681", "long": "-2.714938", "status": "planning", "mw": 100, "ext_id": "9763"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/10/2021", "to": "15/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "10/08/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "10/08/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9763", "Record Last Updated (dd/mm/yyyy)": "15/08/2022", "Operator (or Applicant)": "Riverside Estates (NW) Limited", "Site Name": "Cholmondeley Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The South East Of Junction Between Weaver View And Cholmondeley Road Runcorn", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA7 4XU", "X-coordinate": "352465", "Y-coordinate": "379877", "Planning Authority": "Halton Borough Council", "Planning Application Reference": "21/00565/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.313681", "long": "-2.714938", "status": "planning", "mw": 100, "ext_id": "9763"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cholmondeley Road - Battery Storage", "name_short": "Cholmondeley Road", "owner": "Riverside Estates (NW) Limited", "state": "north west", "country": "uk", "lat": "53.313681", "long": "-2.714938", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.313681+-2.714938", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stranoch 2", "city": "", "id": "582", "external_id": "7306", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "582", "external_id": "7306", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stranoch 2", "external_id": "7306", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "EDF Energy", "status": "planning", "date_first_heard": "2021-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.999476", "long": "-4.886167", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7306", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "EDF Energy", "Site Name": "Stranoch 2", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6600", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "New Luce, Newton Stewart", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "215493", "Y-coordinate": "571022", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000710", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "54.999476", "long": "-4.886167", "status": "planning", "mw": 20, "ext_id": "7306"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "24/11/2027", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "24/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7306", "Record Last Updated (dd/mm/yyyy)": "24/11/2021", "Operator (or Applicant)": "EDF Energy", "Site Name": "Stranoch 2", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6600", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "4258", "Address": "New Luce, Newton Stewart", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "215493", "Y-coordinate": "571022", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000710", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/11/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.999476", "long": "-4.886167", "status": "planning", "mw": 20, "ext_id": "7306"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stranoch 2", "name_short": "Stranoch 2", "owner": "EDF Energy", "state": "scotland", "country": "uk", "lat": "54.999476", "long": "-4.886167", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.999476+-4.886167", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "city": "", "id": "583", "external_id": "8342", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "583", "external_id": "8342", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "external_id": "8342", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Scottish Power Renewables", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.712239", "long": "-4.343163", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8342", "Record Last Updated (dd/mm/yyyy)": "23/11/2021", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8341", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Eaglesham", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G76", "X-coordinate": "252887", "Y-coordinate": "649022", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "21/0261/PP ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.712239", "long": "-4.343163", "status": "planning", "mw": 50, "ext_id": "8342"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2021", "to": "21/02/2022", "extra": "", "change_type": "misc"}, {"name": "Post Code", "from": "G76", "to": "G76 0QQ", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "East Ayrshire Council", "to": "Scottish Government (S36)", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/0261/PP ", "to": "ECU00002198", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "13/05/2021", "to": "17/04/2021", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Storage Co-location REPD Ref ID", "from": "8341", "to": "8341 & 9076", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/02/2022", "to": "05/02/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8342", "Record Last Updated (dd/mm/yyyy)": "05/02/2021", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8341 & 9076", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Eaglesham", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G76 0QQ", "X-coordinate": "252887", "Y-coordinate": "649022", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002198", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.712239", "long": "-4.343163", "status": "planning", "mw": 50, "ext_id": "8342"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "name_short": "Whitelees Hydrogen Production Facil...", "owner": "Scottish Power Renewables", "state": "scotland", "country": "uk", "lat": "55.712239", "long": "-4.343163", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.712239+-4.343163", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rush Green Motors - Battery storage", "city": "", "id": "584", "external_id": "8987", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "584", "external_id": "8987", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rush Green Motors - Battery storage", "external_id": "8987", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RNA Energy limited", "status": "planning", "date_first_heard": "2021-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.89874", "long": "-0.24134", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8987", "Record Last Updated (dd/mm/yyyy)": "25/10/2021", "Operator (or Applicant)": "RNA Energy limited", "Site Name": "Rush Green Motors - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Rush Green Motors, London Road, Langley, Hitchin", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG4 7PQ", "X-coordinate": "521101", "Y-coordinate": "223705", "Planning Authority": "North Hertfordshire District Council", "Planning Application Reference": "21/01860/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/10/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.89874", "long": "-0.24134", "status": "planning", "mw": 49, "ext_id": "8987"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/10/2021", "to": "24/01/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/01/2022", "to": "15/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/10/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2022", "to": "11/10/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8987", "Record Last Updated (dd/mm/yyyy)": "11/10/2023", "Operator (or Applicant)": "RNA Energy limited", "Site Name": "Rush Green Motors - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rush Green Motors, London Road, Langley, Hitchin", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG4 7PQ", "X-coordinate": "521101", "Y-coordinate": "223705", "Planning Authority": "North Hertfordshire District Council", "Planning Application Reference": "21/01860/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/10/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/10/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.89874", "long": "-0.24134", "status": "planning", "mw": 49, "ext_id": "8987"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rush Green Motors - Battery storage", "name_short": "Rush Green Motors", "owner": "RNA Energy limited", "state": "eastern", "country": "uk", "lat": "51.89874", "long": "-0.24134", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.89874+-0.24134", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Tawton Primary Substation - Battery Storage", "city": "", "id": "585", "external_id": "9275", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "585", "external_id": "9275", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "North Tawton Primary Substation - Battery Storage", "external_id": "9275", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Balance Power Projects Limited", "status": "planning", "date_first_heard": "2021-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.796767", "long": "-3.912325", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9275", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "North Tawton Primary Substation - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "S/O North Tawton Primary Substation, North Tawton", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX20 2DA", "X-coordinate": "265325", "Y-coordinate": "101433", "Planning Authority": "West Devon Borough Council", "Planning Application Reference": "2094/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.796767", "long": "-3.912325", "status": "planning", "mw": 30, "ext_id": "9275"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/11/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9275", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "North Tawton Primary Substation - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O North Tawton Primary Substation, North Tawton", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX20 2DA", "X-coordinate": "265325", "Y-coordinate": "101433", "Planning Authority": "West Devon Borough Council", "Planning Application Reference": "2094/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/11/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.796767", "long": "-3.912325", "status": "planning", "mw": 30, "ext_id": "9275"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2021-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "North Tawton Primary Substation - Battery Storage", "name_short": "North Tawton Primary Substation", "owner": "Balance Power Projects Limited", "state": "south west", "country": "uk", "lat": "50.796767", "long": "-3.912325", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.796767+-3.912325", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scawby Brook, Brigg - Battery Storage", "city": "", "id": "587", "external_id": "9848", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Centrica Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "587", "external_id": "9848", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Scawby Brook, Brigg - Battery Storage", "external_id": "9848", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Centrica Plc", "status": "planning", "date_first_heard": "2021-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.541003", "long": "-0.505732", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9848", "Record Last Updated (dd/mm/yyyy)": "26/10/2021", "Operator (or Applicant)": "Centrica Plc", "Site Name": "Scawby Brook, Brigg - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Power Station Access Roads To Power Station, Scawby Brook Brigg", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN20 9LT", "X-coordinate": "499120", "Y-coordinate": "405967", "Planning Authority": "North Lincolnshire Council", "Planning Application Reference": "PA/2021/1288", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.541003", "long": "-0.505732", "status": "planning", "mw": 99, "ext_id": "9848"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9848", "Record Last Updated (dd/mm/yyyy)": "26/10/2021", "Operator (or Applicant)": "Centrica Plc", "Site Name": "Scawby Brook, Brigg - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Power Station Access Roads To Power Station, Scawby Brook Brigg", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN20 9LT", "X-coordinate": "499120", "Y-coordinate": "405967", "Planning Authority": "North Lincolnshire Council", "Planning Application Reference": "PA/2021/1288", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.541003", "long": "-0.505732", "status": "planning", "mw": 99, "ext_id": "9848"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2021-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Scawby Brook, Brigg - Battery Storage", "name_short": "Scawby Brook, Brigg", "owner": "Centrica Plc", "state": "yorkshire and humber", "country": "uk", "lat": "53.541003", "long": "-0.505732", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.541003+-0.505732", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ipswich Road, Cardiff - Battery Storage ", "city": "", "id": "589", "external_id": "9910", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "589", "external_id": "9910", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ipswich Road, Cardiff - Battery Storage ", "external_id": "9910", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.498785", "long": "-3.145501", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9910", "Record Last Updated (dd/mm/yyyy)": "11/11/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Ipswich Road, Cardiff - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "First Choice Accident Repair, Ipswich Road, Penylan, Cardiff", "County": "South Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF23 9AQ", "X-coordinate": "320581", "Y-coordinate": "178383", "Planning Authority": "City of Cardiff Council", "Planning Application Reference": "21/02369/MNR", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.498785", "long": "-3.145501", "status": "planning", "mw": 50, "ext_id": "9910"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Planning Authority", "from": "City of Cardiff Council", "to": "Cardiff Council", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2021", "to": "15/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "15610", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9910", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Ipswich Road, Cardiff - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15610", "Are they re-applying (Old REPD Ref) ": "", "Address": "First Choice Accident Repair, Ipswich Road, Penylan, Cardiff", "County": "South Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF23 9AQ", "X-coordinate": "320581", "Y-coordinate": "178383", "Planning Authority": "Cardiff Council", "Planning Application Reference": "21/02369/MNR", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.498785", "long": "-3.145501", "status": "planning", "mw": 50, "ext_id": "9910"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ipswich Road, Cardiff - Battery Storage ", "name_short": "Ipswich Road, Cardiff - Battery Sto...", "owner": "Green Frog Power 214 Limited", "state": "wales", "country": "uk", "lat": "51.498785", "long": "-3.145501", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.498785+-3.145501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Douglas West Wind Farm (extension)", "city": "", "id": "590", "external_id": "9957", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Greencoat UK Wind PLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "590", "external_id": "9957", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Douglas West Wind Farm (extension)", "external_id": "9957", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ScottishPower Renewables (UK) Limited", "status": "planning", "date_first_heard": "2021-11-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.587358", "long": "-3.890104", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9957", "Record Last Updated (dd/mm/yyyy)": "18/11/2021", "Operator (or Applicant)": "Greencoat UK Wind PLC", "Site Name": "Douglas West Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6826", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0NN", "X-coordinate": "280968", "Y-coordinate": "634257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001836", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.587358", "long": "-3.890104", "status": "planning", "mw": 20, "ext_id": "9957"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Operator (or Applicant)", "from": "Greencoat UK Wind PLC", "to": "ScottishPower Renewables (UK) Limited", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde", "to": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark,", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "18/11/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9957", "Record Last Updated (dd/mm/yyyy)": "18/11/2021", "Operator (or Applicant)": "ScottishPower Renewables (UK) Limited", "Site Name": "Douglas West Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6826", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark,", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0NN", "X-coordinate": "280968", "Y-coordinate": "634257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001836", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/11/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.587358", "long": "-3.890104", "status": "planning", "mw": 20, "ext_id": "9957"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-11-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Douglas West Wind Farm (extension)", "name_short": "Douglas West Wind Farm (extension)", "owner": "ScottishPower Renewables (UK) Limited", "state": "scotland", "country": "uk", "lat": "55.587358", "long": "-3.890104", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.587358+-3.890104", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barlow Road, Barlow - Battery Storage", "city": "", "id": "592", "external_id": "9970", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "592", "external_id": "9970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barlow Road, Barlow - Battery Storage", "external_id": "9970", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Vox Energy Limited", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9970", "Record Last Updated (dd/mm/yyyy)": "19/11/2021", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Home Farm Barlow Road Barlow ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX ", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/1154/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 50, "ext_id": "9970"}, "first_month": "2021-12", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/11/2021", "to": "28/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12734", "extra": "", "change_type": "misc"}, {"name": "Planning Application Withdrawn", "from": "", "to": "18/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/11/2022", "to": "19/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9970", "Record Last Updated (dd/mm/yyyy)": "19/11/2021", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12734", "Are they re-applying (Old REPD Ref) ": "", "Address": "Home Farm Barlow Road Barlow ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX ", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/1154/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2021", "Planning Application Withdrawn": "18/10/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 50, "ext_id": "9970"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barlow Road, Barlow - Battery Storage", "name_short": "Barlow Road, Barlow", "owner": "Vox Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.773171+-1.057521", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Northington Lane - Battery Storage Facility", "city": "", "id": "593", "external_id": "9992", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "593", "external_id": "9992", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Northington Lane - Battery Storage Facility", "external_id": "9992", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Green Frog Ventures Limited", "status": "planning", "date_first_heard": "2023-05-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.776361", "long": "-2.434889", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9992", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Green Frog Ventures Limited", "Site Name": "Northington Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Northington Lane, Awre", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL14 1EL", "X-coordinate": "370092", "Y-coordinate": "208722", "Planning Authority": "Forest of Dean District Council", "Planning Application Reference": "P1817/21/FUL", "Appeal Reference": "AP0026/22/REF", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "12/05/2022", "Appeal Lodged": "16/09/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "09/05/2023", "Planning Permission Granted": "09/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.776361", "long": "-2.434889", "status": "planning", "mw": 35, "ext_id": "9992"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2023", "to": "23/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9992", "Record Last Updated (dd/mm/yyyy)": "23/11/2021", "Operator (or Applicant)": "Green Frog Ventures Limited", "Site Name": "Northington Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Northington Lane, Awre", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL14 1EL", "X-coordinate": "370092", "Y-coordinate": "208722", "Planning Authority": "Forest of Dean District Council", "Planning Application Reference": "P1817/21/FUL", "Appeal Reference": "AP0026/22/REF", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "12/05/2022", "Appeal Lodged": "16/09/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "09/05/2023", "Planning Permission Granted": "09/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.776361", "long": "-2.434889", "status": "planning", "mw": 35, "ext_id": "9992"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2023-05-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Northington Lane - Battery Storage Facility", "name_short": "Northington Lane", "owner": "Green Frog Ventures Limited", "state": "south west", "country": "uk", "lat": "51.776361", "long": "-2.434889", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.776361+-2.434889", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sundon Sub Station Battery Storage Facility", "city": "", "id": "594", "external_id": "9998", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Clearstone Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "594", "external_id": "9998", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sundon Sub Station Battery Storage Facility", "external_id": "9998", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Clearstone Energy Limited", "status": "planning", "date_first_heard": "2021-11-10", "start_construction": "2023-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.931246", "long": "-0.504851", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9998", "Record Last Updated (dd/mm/yyyy)": "24/11/2021", "Operator (or Applicant)": "Clearstone Energy Limited", "Site Name": "Sundon Sub Station Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sundon Sub-Station, Chalton, Luton", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UQ", "X-coordinate": "502897", "Y-coordinate": "226915", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/21/02107/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.931246", "long": "-0.504851", "status": "planning", "mw": 50, "ext_id": "9998"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "10/11/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/11/2021", "to": "08/11/2023", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9998", "Record Last Updated (dd/mm/yyyy)": "08/11/2023", "Operator (or Applicant)": "Clearstone Energy Limited", "Site Name": "Sundon Sub Station Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sundon Sub-Station, Chalton, Luton", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UQ", "X-coordinate": "502897", "Y-coordinate": "226915", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/21/02107/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/11/2024", "Under Construction": "01/07/2023", "Operational": "", "Heat Network Ref": "", "lat": "51.931246", "long": "-0.504851", "status": "planning", "mw": 50, "ext_id": "9998"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-10", "start_construction": "2023-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sundon Sub Station Battery Storage Facility", "name_short": "Sundon Sub Station", "owner": "Clearstone Energy Limited", "state": "eastern", "country": "uk", "lat": "51.931246", "long": "-0.504851", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.931246+-0.504851", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mount Road, Castle Gresley - Battery Storage Facility", "city": "", "id": "595", "external_id": "10012", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Flexion Energy UK Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "595", "external_id": "10012", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mount Road, Castle Gresley - Battery Storage Facility", "external_id": "10012", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Flexion Energy UK Storage Limited", "status": "planning", "date_first_heard": "2022-07-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.758117", "long": "-1.592736", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10012", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "Flexion Energy UK Storage Limited", "Site Name": "Mount Road, Castle Gresley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Mount Road Castle Gresley", "County": "South Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE11 9ES", "X-coordinate": "427582", "Y-coordinate": "317912", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "DMPA/2021/1698", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.758117", "long": "-1.592736", "status": "planning", "mw": 20, "ext_id": "10012"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/11/2021", "to": "18/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/07/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/08/2022", "to": "29/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10012", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "Flexion Energy UK Storage Limited", "Site Name": "Mount Road, Castle Gresley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Mount Road Castle Gresley", "County": "South Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE11 9ES", "X-coordinate": "427582", "Y-coordinate": "317912", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "DMPA/2021/1698", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.758117", "long": "-1.592736", "status": "planning", "mw": 20, "ext_id": "10012"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-07-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mount Road, Castle Gresley - Battery Storage Facility", "name_short": "Mount Road, Castle Gresley", "owner": "Flexion Energy UK Storage Limited", "state": "east midlands", "country": "uk", "lat": "52.758117", "long": "-1.592736", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.758117+-1.592736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cellarhead - Battery Site", "city": "", "id": "596", "external_id": "10013", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "C&S Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "596", "external_id": "10013", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cellarhead - Battery Site", "external_id": "10013", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 349, "power_mw": 349, "owner": "C&S Energy Limited", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.043113", "long": "-2.077489", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10013", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "C&S Energy Limited", "Site Name": "Cellarhead - Battery Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12179", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Cellarhead Substation, Rownall Road, Wetley Rocks, Stoke on Trent", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST9 0BT", "X-coordinate": "394902", "Y-coordinate": "349541", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2021/0695", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "21/06/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.043113", "long": "-2.077489", "status": "planning", "mw": 349, "ext_id": "10013"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/06/2022", "to": "29/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10013", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "C&S Energy Limited", "Site Name": "Cellarhead - Battery Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12179", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Cellarhead Substation, Rownall Road, Wetley Rocks, Stoke on Trent", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST9 0BT", "X-coordinate": "394902", "Y-coordinate": "349541", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2021/0695", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "21/06/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.043113", "long": "-2.077489", "status": "planning", "mw": 349, "ext_id": "10013"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 349, "mwh_is_estimate": true, "mwh": 349, "mwh_estimate": 349, "status": "planning", "status_class": "", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cellarhead - Battery Site", "name_short": "Cellarhead - Battery Site", "owner": "C&S Energy Limited", "state": "west midlands", "country": "uk", "lat": "53.043113", "long": "-2.077489", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.043113+-2.077489", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "597", "external_id": "10022", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "SSE Enterprise Contracting", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "597", "external_id": "10022", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane - Battery Storage Energy", "external_id": "10022", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "SSE Enterprise Contracting", "status": "planning", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.721092", "long": "-1.276017", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10022", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "SSE Enterprise Contracting", "Site Name": "Kirkhaw Lane - Battery Storage Energy", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Ferrybridge Power Station, Kirkhaw Lane, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RB ", "X-coordinate": "447872", "Y-coordinate": "425208", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02758/CPL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.721092", "long": "-1.276017", "status": "planning", "mw": 150, "ext_id": "10022"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10022", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "SSE Enterprise Contracting", "Site Name": "Kirkhaw Lane - Battery Storage Energy", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9115", "Address": "Ferrybridge Power Station, Kirkhaw Lane, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RB ", "X-coordinate": "447872", "Y-coordinate": "425208", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02758/CPL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.721092", "long": "-1.276017", "status": "planning", "mw": 150, "ext_id": "10022"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane - Battery Storage Energy", "name_short": "Kirkhaw Lane - Battery Storage", "owner": "SSE Enterprise Contracting", "state": "yorkshire and humber", "country": "uk", "lat": "53.721092", "long": "-1.276017", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.721092+-1.276017", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Electricity Sub Station, Strichen - Battery Storage Facility", "city": "", "id": "598", "external_id": "10039", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "598", "external_id": "10039", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Electricity Sub Station, Strichen - Battery Storage Facility", "external_id": "10039", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Intelligent Land Investments Group plc", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.58907", "long": "-2.06495", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10039", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Intelligent Land Investments Group plc", "Site Name": "Electricity Sub Station, Strichen - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Adj Electricity Sub Station Strichen ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 6RH ", "X-coordinate": "396216", "Y-coordinate": "855450", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2021/2556 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.58907", "long": "-2.06495", "status": "planning", "mw": 50, "ext_id": "10039"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/12/2021", "to": "04/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "01/03/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/03/2022", "to": "02/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10039", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Intelligent Land Investments Group plc", "Site Name": "Electricity Sub Station, Strichen - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Electricity Sub Station Strichen ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 6RH ", "X-coordinate": "396216", "Y-coordinate": "855450", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2021/2556 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.58907", "long": "-2.06495", "status": "planning", "mw": 50, "ext_id": "10039"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Electricity Sub Station, Strichen - Battery Storage Facility", "name_short": "Electricity Sub Station, Strichen", "owner": "Intelligent Land Investments Group plc", "state": "scotland", "country": "uk", "lat": "57.58907", "long": "-2.06495", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.58907+-2.06495", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Caton Road, Lancaster - Battery Storage Facility", "city": "", "id": "599", "external_id": "10047", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Energi Generation 12 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "599", "external_id": "10047", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Caton Road, Lancaster - Battery Storage Facility", "external_id": "10047", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Energi Generation 12 Limited", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.068278", "long": "-2.786902", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10047", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Energi Generation 12 Limited", "Site Name": "Caton Road, Lancaster - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The North East Of Kidds Transport Limited Caton Road Lancaster ", "County": "Lancashire ", "Region": "North West", "Country": "England", "Post Code": "LA1 3PE ", "X-coordinate": "348600", "Y-coordinate": "463880", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/01351/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "54.068278", "long": "-2.786902", "status": "planning", "mw": 25, "ext_id": "10047"}, "first_month": "2021-12", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/12/2021", "to": "13/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "07/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/12/2027", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10047", "Record Last Updated (dd/mm/yyyy)": "13/12/2022", "Operator (or Applicant)": "Energi Generation 12 Limited", "Site Name": "Caton Road, Lancaster - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The North East Of Kidds Transport Limited Caton Road Lancaster ", "County": "Lancashire ", "Region": "North West", "Country": "England", "Post Code": "LA1 3PE ", "X-coordinate": "348600", "Y-coordinate": "463880", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/01351/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/12/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.068278", "long": "-2.786902", "status": "planning", "mw": 25, "ext_id": "10047"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Caton Road, Lancaster - Battery Storage Facility", "name_short": "Caton Road, Lancaster", "owner": "Energi Generation 12 Limited", "state": "north west", "country": "uk", "lat": "54.068278", "long": "-2.786902", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.068278+-2.786902", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "St Dennis - Battery Energy Storage", "city": "", "id": "600", "external_id": "10058", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Renewable Connections Ltd / Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "600", "external_id": "10058", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "St Dennis - Battery Energy Storage", "external_id": "10058", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Renewable Connections Ltd / Pivot Power", "status": "planning", "date_first_heard": "2022-02-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.390904", "long": "-4.894964", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10058", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Renewable Connections Ltd / Pivot Power", "Site Name": "St Dennis - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Indian Queens Sub-Station B3279 From Gaverigan To Carne Hill St Dennis, St Austell", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194320", "Y-coordinate": "58565", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA21/10827", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.390904", "long": "-4.894964", "status": "planning", "mw": 100, "ext_id": "10058"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/12/2021", "to": "08/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "02/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "02/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/02/2022", "to": "02/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "14461 & 14687", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10058", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Renewable Connections Ltd / Pivot Power", "Site Name": "St Dennis - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14461 & 14687", "Are they re-applying (Old REPD Ref) ": "", "Address": "Indian Queens Sub-Station B3279 From Gaverigan To Carne Hill St Dennis, St Austell", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194320", "Y-coordinate": "58565", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA21/10827", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.390904", "long": "-4.894964", "status": "planning", "mw": 100, "ext_id": "10058"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-02-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "St Dennis - Battery Energy Storage", "name_short": "St Dennis", "owner": "Renewable Connections Ltd / Pivot Power", "state": "south west", "country": "uk", "lat": "50.390904", "long": "-4.894964", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.390904+-4.894964", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Park Road Battery Storage", "city": "", "id": "601", "external_id": "10076", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Arlington Energy Limited Avery Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "601", "external_id": "10076", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Park Road Battery Storage", "external_id": "10076", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Arlington Energy Limited Avery Energy", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.695448", "long": "-2.203131", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10076", "Record Last Updated (dd/mm/yyyy)": "07/12/2021", "Operator (or Applicant)": "Arlington Energy Limited Avery Energy", "Site Name": "Park Road Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Park Road, Bacup", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL13 0BW", "X-coordinate": "386685", "Y-coordinate": "422131", "Planning Authority": "Rossendale Borough Council", "Planning Application Reference": "2021/0456", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.695448", "long": "-2.203131", "status": "planning", "mw": 10, "ext_id": "10076"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/12/2021", "to": "26/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "19/11/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10076", "Record Last Updated (dd/mm/yyyy)": "26/09/2022", "Operator (or Applicant)": "Arlington Energy Limited Avery Energy", "Site Name": "Park Road Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Park Road, Bacup", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL13 0BW", "X-coordinate": "386685", "Y-coordinate": "422131", "Planning Authority": "Rossendale Borough Council", "Planning Application Reference": "2021/0456", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/11/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.695448", "long": "-2.203131", "status": "planning", "mw": 10, "ext_id": "10076"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Park Road Battery Storage", "name_short": "Park Road", "owner": "Arlington Energy Limited Avery Energy", "state": "north west", "country": "uk", "lat": "53.695448", "long": "-2.203131", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.695448+-2.203131", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greystones Road, Grangetown - Battery Energy Storage System", "city": "", "id": "602", "external_id": "10081", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "360", "power_mw": "360", "customer": "", "owner": "Sembcorp Utilities UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "602", "external_id": "10081", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Greystones Road, Grangetown - Battery Energy Storage System", "external_id": "10081", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Sembcorp Utilities UK Limited", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.572705", "long": "-1.129556", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10081", "Record Last Updated (dd/mm/yyyy)": "11/11/2021", "Operator (or Applicant)": "Sembcorp Utilities UK Limited", "Site Name": "Greystones Road, Grangetown - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "360.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Wilton Internationaln Off A1053 Greystones Roadn Grangetown", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8JH", "X-coordinate": "456370", "Y-coordinate": "520069", "Planning Authority": "Redcar and Cleveland Council", "Planning Application Reference": "R/2021/0888/CL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "54.572705", "long": "-1.129556", "status": "planning", "mw": 360, "ext_id": "10081"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2021", "to": "11/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Redcar and Cleveland Council", "to": "Redcar and Cleveland Borough Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/02/2022", "to": "11/11/2021", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "360", "to": "60", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Redcar and Cleveland Borough Council", "to": "Redcar & Cleveland Borough Council", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 360, "to": 60, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10081", "Record Last Updated (dd/mm/yyyy)": "11/11/2021", "Operator (or Applicant)": "Sembcorp Utilities UK Limited", "Site Name": "Greystones Road, Grangetown - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wilton Internationaln Off A1053 Greystones Roadn Grangetown", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8JH", "X-coordinate": "456370", "Y-coordinate": "520069", "Planning Authority": "Redcar & Cleveland Borough Council", "Planning Application Reference": "R/2021/0888/CL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572705", "long": "-1.129556", "status": "planning", "mw": 60, "ext_id": "10081"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Greystones Road, Grangetown - Battery Energy Storage System", "name_short": "Greystones Road, Grangetown - Batte...", "owner": "Sembcorp Utilities UK Limited", "state": "north east", "country": "uk", "lat": "54.572705", "long": "-1.129556", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.572705+-1.129556", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "city": "", "id": "603", "external_id": "10163", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Fleet BESS Limited & SSE Energy Solutions Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "603", "external_id": "10163", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "external_id": "10163", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Fleet BESS Limited & SSE Energy Solutions Limited", "status": "planning", "date_first_heard": "2023-01-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.237175", "long": "-0.890978", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10163", "Record Last Updated (dd/mm/yyyy)": "24/12/2021", "Operator (or Applicant)": "Fleet BESS Limited & SSE Energy Solutions Limited", "Site Name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": " Penn Croft Farm Penn Croft Crondall Farnham ", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "GU10 5PX ", "X-coordinate": "477520", "Y-coordinate": "149250", "Planning Authority": "Hart District Council", "Planning Application Reference": "21/02937/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.237175", "long": "-0.890978", "status": "planning", "mw": 100, "ext_id": "10163"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/12/2021", "to": "06/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/02/2023", "to": "24/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10163", "Record Last Updated (dd/mm/yyyy)": "24/12/2021", "Operator (or Applicant)": "Fleet BESS Limited & SSE Energy Solutions Limited", "Site Name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Penn Croft Farm Penn Croft Crondall Farnham ", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "GU10 5PX ", "X-coordinate": "477520", "Y-coordinate": "149250", "Planning Authority": "Hart District Council", "Planning Application Reference": "21/02937/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.237175", "long": "-0.890978", "status": "planning", "mw": 100, "ext_id": "10163"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-01-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "name_short": "Penn Croft Farm, Crondall - Battery...", "owner": "Fleet BESS Limited & SSE Energy Solutions Limited", "state": "south east", "country": "uk", "lat": "51.237175", "long": "-0.890978", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.237175+-0.890978", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "A981 Fraserburgh - Battery Energy Storage", "city": "", "id": "606", "external_id": "10222", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Fraserburgh Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "606", "external_id": "10222", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "A981 Fraserburgh - Battery Energy Storage", "external_id": "10222", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Fraserburgh Energy Limited", "status": "planning", "date_first_heard": "2022-02-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.671398", "long": "-2.026323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10222", "Record Last Updated (dd/mm/yyyy)": "29/12/2021", "Operator (or Applicant)": "Fraserburgh Energy Limited", "Site Name": "A981 Fraserburgh - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "E/O A981 Fraserburgh", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8TT", "X-coordinate": "398529", "Y-coordinate": "864614", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2021/2855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.671398", "long": "-2.026323", "status": "planning", "mw": 25, "ext_id": "10222"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/12/2021", "to": "28/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "21/02/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10222", "Record Last Updated (dd/mm/yyyy)": "28/02/2022", "Operator (or Applicant)": "Fraserburgh Energy Limited", "Site Name": "A981 Fraserburgh - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O A981 Fraserburgh", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8TT", "X-coordinate": "398529", "Y-coordinate": "864614", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2021/2855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.671398", "long": "-2.026323", "status": "planning", "mw": 25, "ext_id": "10222"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-02-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "A981 Fraserburgh - Battery Energy Storage", "name_short": "A981 Fraserburgh", "owner": "Fraserburgh Energy Limited", "state": "scotland", "country": "uk", "lat": "57.671398", "long": "-2.026323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.671398+-2.026323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upper Geiselittle - Energy Storage Facility", "city": "", "id": "607", "external_id": "10225", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "607", "external_id": "10225", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stainland Energy Storage Project", "external_id": "10225", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Energy Storage Limited", "status": "planning", "date_first_heard": "2022-11-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.5694", "long": "-3.506234", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10225", "Record Last Updated (dd/mm/yyyy)": "29/12/2021", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Upper Geiselittle - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "E/O The A9 N/O Upper Geiselittle Thurso ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 8YH", "X-coordinate": "312487", "Y-coordinate": "965579", "Planning Authority": "Highlands Council", "Planning Application Reference": "21/05957/PAN", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "58.5694", "long": "-3.506234", "status": "planning", "mw": 49, "ext_id": "10225"}, "first_month": "2021-12", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/12/2021", "to": "21/06/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Upper Geiselittle - Energy Storage Facility", "to": "Stainland Energy Storage Project", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/05957/PAN", "to": "22/02054/FUL", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "21/12/2021", "to": "23/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/06/2022", "to": "14/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "04/11/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "04/11/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/12/2022", "to": "29/12/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10225", "Record Last Updated (dd/mm/yyyy)": "29/12/2021", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Stainland Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O The A9 N/O Upper Geiselittle Thurso ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 8YH", "X-coordinate": "312487", "Y-coordinate": "965579", "Planning Authority": "Highland Council", "Planning Application Reference": "22/02054/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/11/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.5694", "long": "-3.506234", "status": "planning", "mw": 49, "ext_id": "10225"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-11-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stainland Energy Storage Project", "name_short": "Stainland", "owner": "Whirlwind Energy Storage Limited", "state": "scotland", "country": "uk", "lat": "58.5694", "long": "-3.506234", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.5694+-3.506234", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "city": "", "id": "608", "external_id": "10226", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "608", "external_id": "10226", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "external_id": "10226", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Statkraft UK Limited", "status": "planning", "date_first_heard": "2022-08-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.562812", "long": "-3.680387", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10226", "Record Last Updated (dd/mm/yyyy)": "24/12/2021", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "475M NW/O Hillcrest Cottage, Shebster ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7RA", "X-coordinate": "302340", "Y-coordinate": "965086", "Planning Authority": "Highlands Council", "Planning Application Reference": "21/05467/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "58.562812", "long": "-3.680387", "status": "planning", "mw": 19, "ext_id": "10226"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/12/2021", "to": "29/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "22/08/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/08/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10226", "Record Last Updated (dd/mm/yyyy)": "29/09/2022", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "475M NW/O Hillcrest Cottage, Shebster ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7RA", "X-coordinate": "302340", "Y-coordinate": "965086", "Planning Authority": "Highland Council", "Planning Application Reference": "21/05467/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.562812", "long": "-3.680387", "status": "planning", "mw": 19, "ext_id": "10226"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2022-08-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "name_short": "Hillcrest Cottage, Shebster - Batte...", "owner": "Statkraft UK Limited", "state": "scotland", "country": "uk", "lat": "58.562812", "long": "-3.680387", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.562812+-3.680387", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elland Storage Project", "city": "", "id": "609", "external_id": "10236", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "609", "external_id": "10236", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Elland Storage Project", "external_id": "10236", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "planning", "date_first_heard": "2020-12-23", "start_construction": "2022-08-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10236", "Record Last Updated (dd/mm/yyyy)": "10/01/2022", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Elland Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "20/01226/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "10236"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2022", "to": "15/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "23/12/2023", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/08/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/08/2022", "to": "20/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/08/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "15304", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10236", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Elland Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15304", "Are they re-applying (Old REPD Ref) ": "7053", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "20/01226/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/12/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "10236"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-10", "start_construction": "2022-08-15", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-12-23", "start_construction": "2022-08-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Elland Storage Project", "name_short": "Elland Storage", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.692652+-1.82446", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lethen Wind Farm Wind Turbines and Energy Storage", "city": "", "id": "610", "external_id": "10237", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Fred Olsen Renewables Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "610", "external_id": "10237", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lethen Wind Farm Wind Turbines and Energy Storage", "external_id": "10237", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Fred Olsen Renewables Ltd", "status": "planning", "date_first_heard": "2022-01-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.399518", "long": "-3.779239", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10237", "Record Last Updated (dd/mm/yyyy)": "10/01/2022", "Operator (or Applicant)": "Fred Olsen Renewables Ltd", "Site Name": "Lethen Wind Farm Wind Turbines and Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8489", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land 4700M NW Of Gamekeepers Cottage Nairn", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12", "X-coordinate": "293179", "Y-coordinate": "835745", "Planning Authority": "Highland Council", "Planning Application Reference": "21/05946/S36", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.399518", "long": "-3.779239", "status": "planning", "mw": 10, "ext_id": "10237"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2022", "to": "24/01/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Highland Council", "to": "Scottish Government (S36)", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/05946/S36", "to": "ECU00002216", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "20/12/2021", "to": "21/01/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/01/2022", "to": "10/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10237", "Record Last Updated (dd/mm/yyyy)": "10/01/2022", "Operator (or Applicant)": "Fred Olsen Renewables Ltd", "Site Name": "Lethen Wind Farm Wind Turbines and Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8489", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 4700M NW Of Gamekeepers Cottage Nairn", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12", "X-coordinate": "293179", "Y-coordinate": "835745", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002216", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.399518", "long": "-3.779239", "status": "planning", "mw": 10, "ext_id": "10237"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2022-01-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lethen Wind Farm Wind Turbines and Energy Storage", "name_short": "Lethen Wind Farm Wind Turbines", "owner": "Fred Olsen Renewables Ltd", "state": "scotland", "country": "uk", "lat": "57.399518", "long": "-3.779239", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.399518+-3.779239", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordtown Energy Storage (Resubmission)", "city": "", "id": "611", "external_id": "10239", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments (ILI)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "611", "external_id": "10239", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordtown Energy Storage", "external_id": "10239", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Private Developer", "status": "planning", "date_first_heard": "2021-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10239", "Record Last Updated (dd/mm/yyyy)": "10/12/2021", "Operator (or Applicant)": "Intelligent Land Investments (ILI)", "Site Name": "Fordtown Energy Storage (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2020/1673", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 49, "ext_id": "10239"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Installed Capacity (MWelec)", "from": "49.90", "to": "19.90", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 49, "to": 19, "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/12/2021", "to": "19/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Intelligent Land Investments (ILI)", "to": "Private Developer", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Fordtown Energy Storage (Resubmission)", "to": "Fordtown Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "19.90", "to": "49.9", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 19, "to": 49, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "24/02/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10239", "Record Last Updated (dd/mm/yyyy)": "19/05/2022", "Operator (or Applicant)": "Private Developer", "Site Name": "Fordtown Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7764", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2020/1673", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 49, "ext_id": "10239"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordtown Energy Storage", "name_short": "Fordtown", "owner": "Private Developer", "state": "scotland", "country": "uk", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.221396+-2.366114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hollandmey Renewable Energy Development", "city": "", "id": "612", "external_id": "10246", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Scottishpower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "612", "external_id": "10246", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hollandmey Renewable Energy Development", "external_id": "10246", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Scottishpower Renewables", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.615252", "long": "-3.216312", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10246", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "Scottishpower Renewables", "Site Name": "Hollandmey Renewable Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8061", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land At Hollandmey Farm And Ph, Phillips Mains, Mey, Thurso, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 8XH", "X-coordinate": "329442", "Y-coordinate": "970342", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003353", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "58.615252", "long": "-3.216312", "status": "planning", "mw": 15, "ext_id": "10246"}, "first_month": "2021-12", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10246", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "Scottishpower Renewables", "Site Name": "Hollandmey Renewable Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8061", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Hollandmey Farm And Ph, Phillips Mains, Mey, Thurso, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 8XH", "X-coordinate": "329442", "Y-coordinate": "970342", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003353", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.615252", "long": "-3.216312", "status": "planning", "mw": 15, "ext_id": "10246"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hollandmey Renewable Energy Development", "name_short": "Hollandmey Renewable Energy Develop...", "owner": "Scottishpower Renewables", "state": "scotland", "country": "uk", "lat": "58.615252", "long": "-3.216312", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.615252+-3.216312", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Doverdale - Solar Farm & Battery Storage", "city": "", "id": "613", "external_id": "10273", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "613", "external_id": "10273", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Doverdale - Solar Farm & Battery Storage", "external_id": "10273", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "JBM Solar Projects Limited", "status": "planning", "date_first_heard": "2021-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.292591", "long": "-2.205603", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10273", "Record Last Updated (dd/mm/yyyy)": "28/06/2021", "Operator (or Applicant)": "JBM Solar Projects Limited", "Site Name": "Doverdale - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9233", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Northwest of Doverdale, Southall Lane, Doverdale, Worcester", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "WR9 0QB", "X-coordinate": "386074", "Y-coordinate": "266071", "Planning Authority": "Wychavon District Council", "Planning Application Reference": "21/01363/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.292591", "long": "-2.205603", "status": "planning", "mw": 49, "ext_id": "10273"}, "first_month": "2021-12", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10273", "Record Last Updated (dd/mm/yyyy)": "28/06/2021", "Operator (or Applicant)": "JBM Solar Projects Limited", "Site Name": "Doverdale - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9233", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Northwest of Doverdale, Southall Lane, Doverdale, Worcester", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "WR9 0QB", "X-coordinate": "386074", "Y-coordinate": "266071", "Planning Authority": "Wychavon District Council", "Planning Application Reference": "21/01363/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.292591", "long": "-2.205603", "status": "planning", "mw": 49, "ext_id": "10273"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Doverdale - Solar Farm & Battery Storage", "name_short": "Doverdale - Solar Farm &", "owner": "JBM Solar Projects Limited", "state": "west midlands", "country": "uk", "lat": "52.292591", "long": "-2.205603", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.292591+-2.205603", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cheshire Power Station - Battery Storage Facility", "city": "", "id": "615", "external_id": "10295", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "RWE Generation UK Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "615", "external_id": "10295", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cheshire Power Station - Battery Storage Facility", "external_id": "10295", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "RWE Generation UK Plc", "status": "planning", "date_first_heard": "2023-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.29758", "long": "-2.911674", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10295", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "RWE Generation UK Plc", "Site Name": "Cheshire Power Station - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Cheshire Power Station North Road, Ellesmere Port ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH65 1AG", "X-coordinate": "339335", "Y-coordinate": "378235", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "21/04501/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.29758", "long": "-2.911674", "status": "planning", "mw": 45, "ext_id": "10295"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2021", "to": "06/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "24/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "24/05/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/06/2023", "to": "22/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10295", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "RWE Generation UK Plc", "Site Name": "Cheshire Power Station - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cheshire Power Station North Road, Ellesmere Port ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH65 1AG", "X-coordinate": "339335", "Y-coordinate": "378235", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "21/04501/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.29758", "long": "-2.911674", "status": "planning", "mw": 45, "ext_id": "10295"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cheshire Power Station - Battery Storage Facility", "name_short": "Cheshire Power Station", "owner": "RWE Generation UK Plc", "state": "north west", "country": "uk", "lat": "53.29758", "long": "-2.911674", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.29758+-2.911674", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "city": "", "id": "616", "external_id": "10302", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Lawford Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "616", "external_id": "10302", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "external_id": "10302", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Lawford Power Limited", "status": "planning", "date_first_heard": "2022-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.916682", "long": "1.016563", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10302", "Record Last Updated (dd/mm/yyyy)": "23/12/2021", "Operator (or Applicant)": "Lawford Power Limited", "Site Name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Adj Lawford Grid Substation Ardleigh Road Little Bromley ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CO11 2QB ", "X-coordinate": "607553", "Y-coordinate": "228539", "Planning Authority": "Tendring District Council", "Planning Application Reference": "21/02070/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.916682", "long": "1.016563", "status": "planning", "mw": 50, "ext_id": "10302"}, "first_month": "2021-12", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/12/2021", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10302", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": "Lawford Power Limited", "Site Name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Lawford Grid Substation Ardleigh Road Little Bromley ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CO11 2QB ", "X-coordinate": "607553", "Y-coordinate": "228539", "Planning Authority": "Tendring District Council", "Planning Application Reference": "21/02070/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.916682", "long": "1.016563", "status": "planning", "mw": 50, "ext_id": "10302"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "name_short": "Ardleigh Road, Little Bromley", "owner": "Lawford Power Limited", "state": "eastern", "country": "uk", "lat": "51.916682", "long": "1.016563", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.916682+1.016563", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stoke Lane - Battery Energy Storage", "city": "", "id": "618", "external_id": "10390", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "FPC Electric Land Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "618", "external_id": "10390", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stoke Lane - Battery Energy Storage", "external_id": "10390", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 130, "power_mw": 130, "owner": "FPC Electric Land Limited", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.565947", "long": "1.278153", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10390", "Record Last Updated (dd/mm/yyyy)": "16/12/2021", "Operator (or Applicant)": "FPC Electric Land Limited", "Site Name": "Stoke Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "130.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O Stoke Lane Dunston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8QD", "X-coordinate": "622270", "Y-coordinate": "301506", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2021/2645", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.565947", "long": "1.278153", "status": "planning", "mw": 130, "ext_id": "10390"}, "first_month": "2021-12", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/12/2021", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "09/09/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10390", "Record Last Updated (dd/mm/yyyy)": "17/10/2022", "Operator (or Applicant)": "FPC Electric Land Limited", "Site Name": "Stoke Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "130", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Stoke Lane Dunston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8QD", "X-coordinate": "622270", "Y-coordinate": "301506", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2021/2645", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.565947", "long": "1.278153", "status": "planning", "mw": 130, "ext_id": "10390"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 130, "mwh_is_estimate": true, "mwh": 130, "mwh_estimate": 130, "status": "planning", "status_class": "", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stoke Lane - Battery Energy Storage", "name_short": "Stoke Lane", "owner": "FPC Electric Land Limited", "state": "eastern", "country": "uk", "lat": "52.565947", "long": "1.278153", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.565947+1.278153", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Speyslaw Farm - Battery Storage", "city": "", "id": "619", "external_id": "10394", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Elgin Energy EsCo", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "619", "external_id": "10394", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Speyslaw Farm - Battery Storage", "external_id": "10394", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Elgin Energy EsCo", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.673978", "long": "-3.194697", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10394", "Record Last Updated (dd/mm/yyyy)": "16/12/2021", "Operator (or Applicant)": "Elgin Energy EsCo", "Site Name": "Speyslaw Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Speyslaw Farm", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV30 8LX", "X-coordinate": "328841", "Y-coordinate": "865529", "Planning Authority": "Moray Council", "Planning Application Reference": "21/01805/APP ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.673978", "long": "-3.194697", "status": "planning", "mw": 19, "ext_id": "10394"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/12/2021", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "09/02/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10394", "Record Last Updated (dd/mm/yyyy)": "02/03/2023", "Operator (or Applicant)": "Elgin Energy EsCo", "Site Name": "Speyslaw Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Speyslaw Farm", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV30 8LX", "X-coordinate": "328841", "Y-coordinate": "865529", "Planning Authority": "Moray Council", "Planning Application Reference": "21/01805/APP ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.673978", "long": "-3.194697", "status": "planning", "mw": 19, "ext_id": "10394"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Speyslaw Farm - Battery Storage", "name_short": "Speyslaw Farm", "owner": "Elgin Energy EsCo", "state": "scotland", "country": "uk", "lat": "57.673978", "long": "-3.194697", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.673978+-3.194697", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Midmill, Kintore - Battery Energy Storage", "city": "", "id": "630", "external_id": "10701", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "630", "external_id": "10701", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Midmill, Kintore - Battery Energy Storage", "external_id": "10701", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gigabox Energy Storage Limited", "status": "planning", "date_first_heard": "2022-07-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.215591", "long": "-2.341436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10701", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Gigabox Energy Storage Limited", "Site Name": "Midmill, Kintore - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Midmill Kintore Aberdeenshire ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XB", "X-coordinate": "379477", "Y-coordinate": "813922", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/0249", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.215591", "long": "-2.341436", "status": "planning", "mw": 49, "ext_id": "10701"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/03/2022", "to": "20/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/07/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/07/2022", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10701", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Gigabox Energy Storage Limited", "Site Name": "Midmill, Kintore - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Midmill Kintore Aberdeenshire ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XB", "X-coordinate": "379477", "Y-coordinate": "813922", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/0249", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.215591", "long": "-2.341436", "status": "planning", "mw": 49, "ext_id": "10701"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-07-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Midmill, Kintore - Battery Energy Storage", "name_short": "Midmill, Kintore", "owner": "Gigabox Energy Storage Limited", "state": "scotland", "country": "uk", "lat": "57.215591", "long": "-2.341436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.215591+-2.341436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rusholme Grange", "city": "", "id": "631", "external_id": "7093", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Hedge Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "631", "external_id": "7093", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rusholme Grange", "external_id": "7093", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Green Hedge Energy", "status": "planning", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7093", "Record Last Updated (dd/mm/yyyy)": "16/09/2019", "Operator (or Applicant)": "Green Hedge Energy", "Site Name": "Rusholme Grange", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2017/1018/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 35, "ext_id": "7093"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/09/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "16/09/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7093", "Record Last Updated (dd/mm/yyyy)": "16/09/2019", "Operator (or Applicant)": "Green Hedge Energy", "Site Name": "Rusholme Grange", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9121", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2017/1018/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 35, "ext_id": "7093"}, "current_month": "2024-01", "dates": {"first_heard": "2019-09-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rusholme Grange", "name_short": "Rusholme Grange", "owner": "Green Hedge Energy", "state": "yorkshire and humber", "country": "uk", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.73117+-0.937436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vicarage Drove - Solar farm & Battery storage", "city": "", "id": "632", "external_id": "8518", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Connections Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "632", "external_id": "8518", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Vicarage Drove - Solar farm & Battery storage", "external_id": "8518", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Renewable Connections Developments Limited", "status": "planning", "date_first_heard": "2022-02-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.931022", "long": "-0.222608", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8518", "Record Last Updated (dd/mm/yyyy)": "28/02/2022", "Operator (or Applicant)": "Renewable Connections Developments Limited", "Site Name": "Vicarage Drove - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8517", "Installed Capacity (MWelec)": "20.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land at Vicarage Drove, Bicker, Boston", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE20 3BF", "X-coordinate": "519567", "Y-coordinate": "338547", "Planning Authority": "Boston Borough Council", "Planning Application Reference": "B/21/0443", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.931022", "long": "-0.222608", "status": "planning", "mw": 20, "ext_id": "8518"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "17/02/2026", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/02/2022", "to": "04/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/11/2022", "to": "11/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8518", "Record Last Updated (dd/mm/yyyy)": "11/05/2022", "Operator (or Applicant)": "Renewable Connections Developments Limited", "Site Name": "Vicarage Drove - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8517", "Installed Capacity (MWelec)": "20.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Vicarage Drove, Bicker, Boston", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE20 3BF", "X-coordinate": "519567", "Y-coordinate": "338547", "Planning Authority": "Boston Borough Council", "Planning Application Reference": "B/21/0443", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.931022", "long": "-0.222608", "status": "planning", "mw": 20, "ext_id": "8518"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-02-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Vicarage Drove - Solar farm & Battery storage", "name_short": "Vicarage Drove - Solar farm &", "owner": "Renewable Connections Developments Limited", "state": "east midlands", "country": "uk", "lat": "52.931022", "long": "-0.222608", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.931022+-0.222608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Moggerhanger Road, Sandy - Solar Farm", "city": "", "id": "633", "external_id": "10981", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Kach Capital Estates Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "633", "external_id": "10981", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Moggerhanger Road, Sandy - Solar Farm", "external_id": "10981", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Kach Capital Estates Limited", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.127053", "long": "-0.305484", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10981", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Kach Capital Estates Limited", "Site Name": "Moggerhanger Road, Sandy - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9349", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O Moggerhanger Road, Sandy, Buntingford", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG19 1ND", "X-coordinate": "516096", "Y-coordinate": "248992", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/22/00752/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.127053", "long": "-0.305484", "status": "planning", "mw": 20, "ext_id": "10981"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10981", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Kach Capital Estates Limited", "Site Name": "Moggerhanger Road, Sandy - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9349", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Moggerhanger Road, Sandy, Buntingford", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG19 1ND", "X-coordinate": "516096", "Y-coordinate": "248992", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/22/00752/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.127053", "long": "-0.305484", "status": "planning", "mw": 20, "ext_id": "10981"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Moggerhanger Road, Sandy - Solar Farm", "name_short": "Moggerhanger Road, Sandy - Solar Fa...", "owner": "Kach Capital Estates Limited", "state": "eastern", "country": "uk", "lat": "52.127053", "long": "-0.305484", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.127053+-0.305484", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "city": "", "id": "635", "external_id": "10436", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Bluefield Sandbach Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "635", "external_id": "10436", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "external_id": "10436", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Bluefield Sandbach Limited", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.165369", "long": "-2.406314", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10436", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Bluefield Sandbach Limited", "Site Name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Former Power Station, Booth Lane, Moston", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW11 3PY", "X-coordinate": "372933", "Y-coordinate": "363216", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "21/6426C ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.165369", "long": "-2.406314", "status": "planning", "mw": 20, "ext_id": "10436"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10436", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Bluefield Sandbach Limited", "Site Name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Power Station, Booth Lane, Moston", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW11 3PY", "X-coordinate": "372933", "Y-coordinate": "363216", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "21/6426C ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.165369", "long": "-2.406314", "status": "planning", "mw": 20, "ext_id": "10436"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "name_short": "Former EON Power Station, Booth Lan...", "owner": "Bluefield Sandbach Limited", "state": "north west", "country": "uk", "lat": "53.165369", "long": "-2.406314", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.165369+-2.406314", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vause Farm - Battery Storage", "city": "", "id": "636", "external_id": "10989", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Sirius Renewable Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "636", "external_id": "10989", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Vause Farm - Battery Storage", "external_id": "10989", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Sirius Renewable Energy Limited", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.614427", "long": "-2.688388", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10989", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Sirius Renewable Energy Limited", "Site Name": "Vause Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "North Of Vause Farm Town Lane Charnock Richard ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR7 5HQ", "X-coordinate": "354557", "Y-coordinate": "413318", "Planning Authority": "Chorley Council", "Planning Application Reference": "22/00362/FULMAJ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.614427", "long": "-2.688388", "status": "planning", "mw": 20, "ext_id": "10989"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10989", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Sirius Renewable Energy Limited", "Site Name": "Vause Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North Of Vause Farm Town Lane Charnock Richard ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR7 5HQ", "X-coordinate": "354557", "Y-coordinate": "413318", "Planning Authority": "Chorley Council", "Planning Application Reference": "22/00362/FULMAJ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.614427", "long": "-2.688388", "status": "planning", "mw": 20, "ext_id": "10989"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Vause Farm - Battery Storage", "name_short": "Vause Farm", "owner": "Sirius Renewable Energy Limited", "state": "north west", "country": "uk", "lat": "53.614427", "long": "-2.688388", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.614427+-2.688388", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Thinford Lane, Thinford - Energy Storage", "city": "", "id": "637", "external_id": "10489", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Renewable Energy Systems Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "637", "external_id": "10489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Thinford Lane, Thinford - Energy Storage", "external_id": "10489", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Renewable Energy Systems Limited", "status": "planning", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.704808", "long": "-1.556153", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10489", "Record Last Updated (dd/mm/yyyy)": "28/01/2022", "Operator (or Applicant)": "Renewable Energy Systems Limited", "Site Name": "South Thinford Lane, Thinford - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "S/O Spennymoor Electricity Substation, South Thinford Lane, Thinford, Durham", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 5JX", "X-coordinate": "428699", "Y-coordinate": "534511", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/00120/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "54.704808", "long": "-1.556153", "status": "planning", "mw": 99, "ext_id": "10489"}, "first_month": "2022-04", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/01/2022", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "28/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10489", "Record Last Updated (dd/mm/yyyy)": "28/01/2022", "Operator (or Applicant)": "Renewable Energy Systems Limited", "Site Name": "South Thinford Lane, Thinford - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Spennymoor Electricity Substation, South Thinford Lane, Thinford, Durham", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 5JX", "X-coordinate": "428699", "Y-coordinate": "534511", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/00120/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.704808", "long": "-1.556153", "status": "planning", "mw": 99, "ext_id": "10489"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Thinford Lane, Thinford - Energy Storage", "name_short": "South Thinford Lane, Thinford", "owner": "Renewable Energy Systems Limited", "state": "north east", "country": "uk", "lat": "54.704808", "long": "-1.556153", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.704808+-1.556153", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Field House Solar Farm", "city": "", "id": "638", "external_id": "10970", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Albanwise Synergy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "638", "external_id": "10970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Field House Solar Farm", "external_id": "10970", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Albanwise Synergy Limited", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.868534", "long": "-0.346585", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10970", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Albanwise Synergy Limited", "Site Name": "Field House Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8995", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Field House Farm, Main Road, Routh, Beverley", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU17 9SL", "X-coordinate": "508818", "Y-coordinate": "442636", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "22/00824/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.868534", "long": "-0.346585", "status": "planning", "mw": 40, "ext_id": "10970"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2022", "to": "28/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "08/07/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/07/2022", "to": "11/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10970", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Albanwise Synergy Limited", "Site Name": "Field House Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8995", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Field House Farm, Main Road, Routh, Beverley", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU17 9SL", "X-coordinate": "508818", "Y-coordinate": "442636", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "22/00824/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.868534", "long": "-0.346585", "status": "planning", "mw": 40, "ext_id": "10970"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Field House Solar Farm", "name_short": "Field House Solar Farm", "owner": "Albanwise Synergy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.868534", "long": "-0.346585", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.868534+-0.346585", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ferrymuir", "city": "", "id": "639", "external_id": "7371", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gore Street Energy Storage Fund", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-21", "start_construction": "1905-07-14", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "639", "external_id": "7371", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ferrymuir", "external_id": "7371", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gore Street Energy Storage Fund", "status": "construction", "date_first_heard": "2019-11-21", "start_construction": "2022-07-29", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.310446", "long": "-3.042318", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7371", "Record Last Updated (dd/mm/yyyy)": "17/03/2022", "Operator (or Applicant)": "Gore Street Energy Storage Fund", "Site Name": "Ferrymuir", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land west of Ferrymuir, South of Westfield Road, Cupar,", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY15 5AP", "X-coordinate": "335613", "Y-coordinate": "713603", "Planning Authority": "Fife Council", "Planning Application Reference": "19/02750/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "14/07/1905", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.310446", "long": "-3.042318", "status": "planning", "mw": 49, "ext_id": "7371"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/03/2022", "to": "21/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/11/2022", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "14/07/1905", "to": "29/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "29/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7371", "Record Last Updated (dd/mm/yyyy)": "29/07/2022", "Operator (or Applicant)": "Gore Street Energy Storage Fund", "Site Name": "Ferrymuir", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land west of Ferrymuir, South of Westfield Road, Cupar,", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY15 5AP", "X-coordinate": "335613", "Y-coordinate": "713603", "Planning Authority": "Fife Council", "Planning Application Reference": "19/02750/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/11/2022", "Under Construction": "29/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "56.310446", "long": "-3.042318", "status": "construction", "mw": 49, "ext_id": "7371"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-17", "start_construction": "2022-09-21", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-11-21", "start_construction": "2022-07-29", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ferrymuir", "name_short": "Ferrymuir", "owner": "Gore Street Energy Storage Fund", "state": "scotland", "country": "uk", "lat": "56.310446", "long": "-3.042318", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.310446+-3.042318", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Strathruddie, Kinglassie - Solar farm", "city": "", "id": "640", "external_id": "10828", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Connection Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "640", "external_id": "10828", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Strathruddie, Kinglassie - Solar farm", "external_id": "10828", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Renewable Connection Developments Limited", "status": "planning", "date_first_heard": "2022-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.163831", "long": "-3.258501", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10828", "Record Last Updated (dd/mm/yyyy)": "21/03/2022", "Operator (or Applicant)": "Renewable Connection Developments Limited", "Site Name": "Strathruddie, Kinglassie - Solar farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9403", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Strathruddie Kinglassie", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0UA", "X-coordinate": "321941", "Y-coordinate": "697509", "Planning Authority": "Fife Council", "Planning Application Reference": "21/03531/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.163831", "long": "-3.258501", "status": "planning", "mw": 20, "ext_id": "10828"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/03/2022", "to": "18/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/03/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/07/2022", "to": "21/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10828", "Record Last Updated (dd/mm/yyyy)": "21/03/2022", "Operator (or Applicant)": "Renewable Connection Developments Limited", "Site Name": "Strathruddie, Kinglassie - Solar farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9403", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Strathruddie Kinglassie", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0UA", "X-coordinate": "321941", "Y-coordinate": "697509", "Planning Authority": "Fife Council", "Planning Application Reference": "21/03531/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.163831", "long": "-3.258501", "status": "planning", "mw": 20, "ext_id": "10828"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Strathruddie, Kinglassie - Solar farm", "name_short": "Strathruddie, Kinglassie - Solar fa...", "owner": "Renewable Connection Developments Limited", "state": "scotland", "country": "uk", "lat": "56.163831", "long": "-3.258501", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.163831+-3.258501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Broomloan Road - Battery Energy Storage", "city": "", "id": "641", "external_id": "10886", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Lifetime Property Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "641", "external_id": "10886", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Broomloan Road - Battery Energy Storage", "external_id": "10886", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Lifetime Property Limited", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.855082", "long": "-4.313696", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10886", "Record Last Updated (dd/mm/yyyy)": "29/03/2022", "Operator (or Applicant)": "Lifetime Property Limited", "Site Name": "Broomloan Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "322 Broomloan Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G51 2JQ", "X-coordinate": "255269", "Y-coordinate": "664853", "Planning Authority": "Glasgow City Council", "Planning Application Reference": "22/00637/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.855082", "long": "-4.313696", "status": "planning", "mw": 49, "ext_id": "10886"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/03/2022", "to": "08/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/06/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/06/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/07/2022", "to": "29/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10886", "Record Last Updated (dd/mm/yyyy)": "29/03/2022", "Operator (or Applicant)": "Lifetime Property Limited", "Site Name": "Broomloan Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "322 Broomloan Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G51 2JQ", "X-coordinate": "255269", "Y-coordinate": "664853", "Planning Authority": "Glasgow City Council", "Planning Application Reference": "22/00637/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.855082", "long": "-4.313696", "status": "planning", "mw": 49, "ext_id": "10886"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Broomloan Road - Battery Energy Storage", "name_short": "Broomloan Road", "owner": "Lifetime Property Limited", "state": "scotland", "country": "uk", "lat": "55.855082", "long": "-4.313696", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.855082+-4.313696", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "city": "", "id": "642", "external_id": "10716", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "R & S Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "642", "external_id": "10716", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "external_id": "10716", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "R & S Energy Limited", "status": "planning", "date_first_heard": "2022-04-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.272655", "long": "-1.8794", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10716", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "R & S Energy Limited", "Site Name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "16.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "STOR Facility, Waterswallows Road, Green Fairfield, Buxton", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK17 7JB", "X-coordinate": "408140", "Y-coordinate": "375081", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2022/0047", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.272655", "long": "-1.8794", "status": "planning", "mw": 16, "ext_id": "10716"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/03/2022", "to": "19/04/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "08/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2022", "to": "04/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10716", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "R & S Energy Limited", "Site Name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "STOR Facility, Waterswallows Road, Green Fairfield, Buxton", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK17 7JB", "X-coordinate": "408140", "Y-coordinate": "375081", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2022/0047", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.272655", "long": "-1.8794", "status": "planning", "mw": 16, "ext_id": "10716"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2022-04-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "name_short": "Waterswallows Road, Green Fairfield...", "owner": "R & S Energy Limited", "state": "east midlands", "country": "uk", "lat": "53.272655", "long": "-1.8794", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.272655+-1.8794", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Model Farm", "city": "", "id": "643", "external_id": "10687", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "643", "external_id": "10687", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Model Farm", "external_id": "10687", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Tribus Clean Energy", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.728144", "long": "0.195226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10687", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Model Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JF", "X-coordinate": "548338", "Y-coordinate": "316760", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "21/01715/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.728144", "long": "0.195226", "status": "planning", "mw": 49, "ext_id": "10687"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "27/01/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "King's Lynn and West Norfolk Borough Council", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10687", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Model Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7609", "Address": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JF", "X-coordinate": "548338", "Y-coordinate": "316760", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "21/01715/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/01/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.728144", "long": "0.195226", "status": "planning", "mw": 49, "ext_id": "10687"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Model Farm", "name_short": "Model Farm", "owner": "Tribus Clean Energy", "state": "eastern", "country": "uk", "lat": "52.728144", "long": "0.195226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.728144+0.195226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walpole St Andrew - Battery storage ", "city": "", "id": "644", "external_id": "10876", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Alfred Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "644", "external_id": "10876", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walpole St Andrew - Battery storage ", "external_id": "10876", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Alfred Energy Limited", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.725219", "long": "0.204631", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10876", "Record Last Updated (dd/mm/yyyy)": "29/03/2022", "Operator (or Applicant)": "Alfred Energy Limited", "Site Name": "Walpole St Andrew - Battery storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Opp Walpole Sub Station Walpole Bank Walpole St Andrew, Wisbech", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14", "X-coordinate": "548983", "Y-coordinate": "316454", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "22/00438/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.725219", "long": "0.204631", "status": "planning", "mw": 100, "ext_id": "10876"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/03/2022", "to": "11/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "King's Lynn and West Norfolk Borough Council", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/10/2022", "to": "29/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10876", "Record Last Updated (dd/mm/yyyy)": "29/03/2022", "Operator (or Applicant)": "Alfred Energy Limited", "Site Name": "Walpole St Andrew - Battery storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opp Walpole Sub Station Walpole Bank Walpole St Andrew, Wisbech", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14", "X-coordinate": "548983", "Y-coordinate": "316454", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/00438/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.725219", "long": "0.204631", "status": "planning", "mw": 100, "ext_id": "10876"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walpole St Andrew - Battery storage ", "name_short": "Walpole St Andrew - Battery storage...", "owner": "Alfred Energy Limited", "state": "eastern", "country": "uk", "lat": "52.725219", "long": "0.204631", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.725219+0.204631", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Netherlands Way - Battery Energy Facility", "city": "", "id": "645", "external_id": "10429", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Volta Energy Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "645", "external_id": "10429", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Netherlands Way - Battery Energy Facility", "external_id": "10429", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Volta Energy Group", "status": "planning", "date_first_heard": "2022-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.610022", "long": "-0.178103", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10429", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Volta Energy Group", "Site Name": "Netherlands Way - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Netherlands Way, Immingham, Grimsby", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN41 8DF", "X-coordinate": "520633", "Y-coordinate": "414150", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/0762/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.610022", "long": "-0.178103", "status": "planning", "mw": 80, "ext_id": "10429"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7090", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/01/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10429", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Volta Energy Group", "Site Name": "Netherlands Way - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7090", "Address": "Netherlands Way, Immingham, Grimsby", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN41 8DF", "X-coordinate": "520633", "Y-coordinate": "414150", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/0762/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/01/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.610022", "long": "-0.178103", "status": "planning", "mw": 80, "ext_id": "10429"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2022-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Netherlands Way - Battery Energy Facility", "name_short": "Netherlands Way - Battery Energy Fa...", "owner": "Volta Energy Group", "state": "yorkshire and humber", "country": "uk", "lat": "53.610022", "long": "-0.178103", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.610022+-0.178103", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Broadgate, Chadderton - Battery Storage Containers", "city": "", "id": "648", "external_id": "10690", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "648", "external_id": "10690", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Broadgate, Chadderton - Battery Storage Containers", "external_id": "10690", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2022-05-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.532153", "long": "-2.165793", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10690", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Broadgate, Chadderton - Battery Storage Containers", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The National Grid Station, Broadgate, Chadderton, Oldham", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL9 9XB", "X-coordinate": "389108", "Y-coordinate": "403957", "Planning Authority": "Oldham Metropolitan Borough Council", "Planning Application Reference": "FUL/348501/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.532153", "long": "-2.165793", "status": "planning", "mw": 20, "ext_id": "10690"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/03/2022", "to": "14/06/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "19/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "19/05/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/06/2022", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10690", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Broadgate, Chadderton - Battery Storage Containers", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The National Grid Station, Broadgate, Chadderton, Oldham", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL9 9XB", "X-coordinate": "389108", "Y-coordinate": "403957", "Planning Authority": "Oldham Metropolitan Borough Council", "Planning Application Reference": "FUL/348501/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.532153", "long": "-2.165793", "status": "planning", "mw": 20, "ext_id": "10690"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-05-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Broadgate, Chadderton - Battery Storage Containers", "name_short": "Broadgate, Chadderton - Battery Sto...", "owner": "Pelagic Energy", "state": "north west", "country": "uk", "lat": "53.532153", "long": "-2.165793", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.532153+-2.165793", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pleasance Road - Battery Energy Facility", "city": "", "id": "649", "external_id": "9997", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coronation Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "649", "external_id": "9997", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pleasance Road - Battery Energy Facility", "external_id": "9997", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gresham House", "status": "planning", "date_first_heard": "2022-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.542146", "long": "-3.273271", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9997", "Record Last Updated (dd/mm/yyyy)": "08/03/2022", "Operator (or Applicant)": "Coronation Power Limited", "Site Name": "Pleasance Road - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": " 130 Metres South East Of Coupar Angus Substation Pleasance Road Coupar ", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9LZ", "X-coordinate": "321803", "Y-coordinate": "739631", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/00195/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.542146", "long": "-3.273271", "status": "planning", "mw": 49, "ext_id": "9997"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/03/2022", "to": "12/07/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Coronation Power Limited", "to": "Gresham House", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "01/06/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9997", "Record Last Updated (dd/mm/yyyy)": "12/07/2022", "Operator (or Applicant)": "Gresham House", "Site Name": "Pleasance Road - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7217", "Address": " 130 Metres South East Of Coupar Angus Substation Pleasance Road Coupar ", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9LZ", "X-coordinate": "321803", "Y-coordinate": "739631", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/00195/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.542146", "long": "-3.273271", "status": "planning", "mw": 49, "ext_id": "9997"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Pleasance Road - Battery Energy Facility", "name_short": "Pleasance Road - Battery Energy Fac...", "owner": "Gresham House", "state": "scotland", "country": "uk", "lat": "56.542146", "long": "-3.273271", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.542146+-3.273271", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Binn Eco Park Wind Farm Energy Storage Facility", "city": "", "id": "650", "external_id": "9098", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Green Cat Renewables Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "650", "external_id": "9098", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Binn Eco Park - Battery", "external_id": "9098", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Green Cat Renewables Developments", "status": "construction", "date_first_heard": "2021-07-12", "start_construction": "2023-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.305805", "long": "-3.338259", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9098", "Record Last Updated (dd/mm/yyyy)": "11/02/2022", "Operator (or Applicant)": "Green Cat Renewables Developments", "Site Name": "Binn Eco Park Wind Farm Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Binn Eco Park Wind Farm Glenfarg", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH2 9PX", "X-coordinate": "317295", "Y-coordinate": "713403", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "21/00834/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/07/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.305805", "long": "-3.338259", "status": "planning", "mw": 10, "ext_id": "9098"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "12/07/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/02/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Binn Eco Park Wind Farm Energy Storage Facility", "to": "Binn Eco Park - Battery", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Stand-alone Storage", "to": "Co-located with RE", "extra": "", "change_type": "misc"}, {"name": "Storage Co-location REPD Ref ID", "from": "", "to": "4817, 7807, 9071 & 13672", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2023", "to": "27/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/09/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9098", "Record Last Updated (dd/mm/yyyy)": "27/10/2023", "Operator (or Applicant)": "Green Cat Renewables Developments", "Site Name": "Binn Eco Park - Battery", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4817, 7807, 9071 & 13672", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Binn Eco Park Wind Farm Glenfarg", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH2 9PX", "X-coordinate": "317295", "Y-coordinate": "713403", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "21/00834/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/07/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/07/2024", "Under Construction": "01/09/2023", "Operational": "", "Heat Network Ref": "", "lat": "56.305805", "long": "-3.338259", "status": "construction", "mw": 10, "ext_id": "9098"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-11", "start_construction": "2023-10-27", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-07-12", "start_construction": "2023-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Binn Eco Park - Battery", "name_short": "Binn Eco Park - Battery", "owner": "Green Cat Renewables Developments", "state": "scotland", "country": "uk", "lat": "56.305805", "long": "-3.338259", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.305805+-3.338259", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jamesfield Organic Centre, Phase 1", "city": "Abernethy", "id": "651", "external_id": "10456", "state": "fife", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "Possible duplicate of 130", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "651", "external_id": "10456", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Jamesfield Organic Centre, Phase 1", "external_id": "10456", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Harmony Energy Storage", "status": "planning", "date_first_heard": "2017-09-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.342816", "long": "-3.291569", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10456", "Record Last Updated (dd/mm/yyyy)": "26/01/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre, Phase 1", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar,", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "320261", "Y-coordinate": "717467", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "17/00951/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.342816", "long": "-3.291569", "status": "planning", "mw": 30, "ext_id": "10456"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10456", "Record Last Updated (dd/mm/yyyy)": "26/01/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre, Phase 1", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10863", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar,", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "320261", "Y-coordinate": "717467", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "17/00951/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.342816", "long": "-3.291569", "status": "planning", "mw": 30, "ext_id": "10456"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2017-09-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Jamesfield Organic Centre, Phase 1", "name_short": "Jamesfield Organic Centre, Phase 1", "owner": "Harmony Energy Storage", "state": "scotland", "country": "uk", "lat": "56.342816", "long": "-3.291569", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.342816+-3.291569", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Possible duplicate of 130"], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Plymouth Stor Generation - Battery storage", "city": "", "id": "652", "external_id": "10432", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "652", "external_id": "10432", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Plymouth Stor Generation - Battery storage", "external_id": "10432", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2022-01-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.367803", "long": "-4.112536", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10432", "Record Last Updated (dd/mm/yyyy)": "21/01/2022", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Plymouth Stor Generation - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Plymouth Stor Generation, Faraday Road, Plymouth", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "PL4 0ST", "X-coordinate": "249857", "Y-coordinate": "54123", "Planning Authority": "Plymouth City Council", "Planning Application Reference": "21/00757/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.367803", "long": "-4.112536", "status": "planning", "mw": 20, "ext_id": "10432"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10432", "Record Last Updated (dd/mm/yyyy)": "21/01/2022", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Plymouth Stor Generation - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Plymouth Stor Generation, Faraday Road, Plymouth", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "PL4 0ST", "X-coordinate": "249857", "Y-coordinate": "54123", "Planning Authority": "Plymouth City Council", "Planning Application Reference": "21/00757/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.367803", "long": "-4.112536", "status": "planning", "mw": 20, "ext_id": "10432"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-01-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Plymouth Stor Generation - Battery storage", "name_short": "Plymouth Stor Generation", "owner": "Green Frog Power 214 Limited", "state": "south west", "country": "uk", "lat": "50.367803", "long": "-4.112536", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.367803+-4.112536", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackhillock Electricity Substation - Battery Energy Storage System", "city": "", "id": "653", "external_id": "9723", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Zenobe Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "653", "external_id": "9723", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackhillock Electricity Substation - Battery Energy Storage System", "external_id": "9723", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 300, "power_mw": 300, "owner": "Zenobe Energy Limited", "status": "construction", "date_first_heard": "2022-09-30", "start_construction": "2023-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.518394", "long": "-2.947527", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9723", "Record Last Updated (dd/mm/yyyy)": "27/01/2022", "Operator (or Applicant)": "Zenobe Energy Limited", "Site Name": "Blackhillock Electricity Substation - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "400m SE/O Blackhillock Electricity Substation, Keith", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NY", "X-coordinate": "343341", "Y-coordinate": "847976", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003404", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.518394", "long": "-2.947527", "status": "planning", "mw": 300, "ext_id": "9723"}, "first_month": "2022-04", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/01/2022", "to": "07/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/09/2027", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/11/2022", "to": "20/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/02/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/02/2023", "to": "28/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9723", "Record Last Updated (dd/mm/yyyy)": "28/09/2021", "Operator (or Applicant)": "Zenobe Energy Limited", "Site Name": "Blackhillock Electricity Substation - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "400m SE/O Blackhillock Electricity Substation, Keith", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NY", "X-coordinate": "343341", "Y-coordinate": "847976", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003404", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2027", "Under Construction": "01/02/2023", "Operational": "", "Heat Network Ref": "", "lat": "57.518394", "long": "-2.947527", "status": "construction", "mw": 300, "ext_id": "9723"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-27", "start_construction": "2023-02-20", "start_operation": ""}, "month_disappeared": ""}, "mw": 300, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09-30", "start_construction": "2023-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackhillock Electricity Substation - Battery Energy Storage System", "name_short": "Blackhillock Electricity Substation...", "owner": "Zenobe Energy Limited", "state": "scotland", "country": "uk", "lat": "57.518394", "long": "-2.947527", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.518394+-2.947527", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hunterston Grid Services Complex - Energy Storage Facility", "city": "", "id": "654", "external_id": "10535", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Amp Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "654", "external_id": "10535", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hunterston Grid Services Complex - Energy Storage Facility", "external_id": "10535", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Amp Energy", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.718396", "long": "-4.878195", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10535", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "Amp Energy", "Site Name": "Hunterston Grid Services Complex - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Campbelton Farm, Campbelton Road, West Kilbride", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA23 9QF", "X-coordinate": "219311", "Y-coordinate": "650973", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003319", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.718396", "long": "-4.878195", "status": "planning", "mw": 400, "ext_id": "10535"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/01/2027", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10535", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "Amp Energy", "Site Name": "Hunterston Grid Services Complex - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Campbelton Farm, Campbelton Road, West Kilbride", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA23 9QF", "X-coordinate": "219311", "Y-coordinate": "650973", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003319", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.718396", "long": "-4.878195", "status": "planning", "mw": 400, "ext_id": "10535"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hunterston Grid Services Complex - Energy Storage Facility", "name_short": "Hunterston Grid Services Complex - ...", "owner": "Amp Energy", "state": "scotland", "country": "uk", "lat": "55.718396", "long": "-4.878195", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.718396+-4.878195", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kincardine Grid Services Complex - Energy Storage Facility", "city": "", "id": "655", "external_id": "10536", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Amp Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "655", "external_id": "10536", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kincardine Grid Services Complex - Energy Storage Facility", "external_id": "10536", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Amp Energy", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.072948", "long": "-3.723051", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10536", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "Amp Energy", "Site Name": "Kincardine Grid Services Complex - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "N/O Kincardine Substation, Kincardine, Alloa", "County": "Clackmannanshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK10 4BJ", "X-coordinate": "292841", "Y-coordinate": "688019", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003326", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.072948", "long": "-3.723051", "status": "planning", "mw": 400, "ext_id": "10536"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/01/2023", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/02/2022", "to": "08/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10536", "Record Last Updated (dd/mm/yyyy)": "08/06/2022", "Operator (or Applicant)": "Amp Energy", "Site Name": "Kincardine Grid Services Complex - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Kincardine Substation, Kincardine, Alloa", "County": "Clackmannanshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK10 4BJ", "X-coordinate": "292841", "Y-coordinate": "688019", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003326", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.072948", "long": "-3.723051", "status": "planning", "mw": 400, "ext_id": "10536"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kincardine Grid Services Complex - Energy Storage Facility", "name_short": "Kincardine Grid Services Complex - ...", "owner": "Amp Energy", "state": "scotland", "country": "uk", "lat": "56.072948", "long": "-3.723051", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.072948+-3.723051", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carrick Windfarm", "city": "", "id": "656", "external_id": "10540", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "656", "external_id": "10540", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Carrick Windfarm", "external_id": "10540", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2022-02-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.240355", "long": "-4.557376", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10540", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Carrick Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7874", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land within Carrick Forest, Kilmarnock", "County": "South Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA19", "X-coordinate": "237500", "Y-coordinate": "597000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003392", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.240355", "long": "-4.557376", "status": "planning", "mw": 20, "ext_id": "10540"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10540", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Carrick Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7874", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land within Carrick Forest, Kilmarnock", "County": "South Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA19", "X-coordinate": "237500", "Y-coordinate": "597000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003392", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.240355", "long": "-4.557376", "status": "planning", "mw": 20, "ext_id": "10540"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-02-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Carrick Windfarm", "name_short": "Carrick Windfarm", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "55.240355", "long": "-4.557376", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.240355+-4.557376", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": " Frodo Solar and Battery Energy Development", "city": "", "id": "657", "external_id": "10994", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Energy International", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "657", "external_id": "10994", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": " Frodo Solar and Battery Energy Development", "external_id": "10994", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Green Energy International", "status": "planning", "date_first_heard": "2023-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.601229", "long": "-1.915156", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10994", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "Green Energy International", "Site Name": " Frodo Solar and Battery Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10993", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Frodo Solar Farm, Crimond, Fraserburgh", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QH", "X-coordinate": "405170", "Y-coordinate": "856805", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003345", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.601229", "long": "-1.915156", "status": "planning", "mw": 50, "ext_id": "10994"}, "first_month": "2022-04", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/04/2022", "to": "07/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/05/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2023", "to": "12/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10994", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "Green Energy International", "Site Name": " Frodo Solar and Battery Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10993", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Frodo Solar Farm, Crimond, Fraserburgh", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QH", "X-coordinate": "405170", "Y-coordinate": "856805", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003345", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/05/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.601229", "long": "-1.915156", "status": "planning", "mw": 50, "ext_id": "10994"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": " Frodo Solar and Battery Energy Development", "name_short": " Frodo Solar and Battery Energy Dev...", "owner": "Green Energy International", "state": "scotland", "country": "uk", "lat": "57.601229", "long": "-1.915156", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.601229+-1.915156", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clachaig Glen", "city": "", "id": "658", "external_id": "10996", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "RWE UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "658", "external_id": "10996", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clachaig Glen", "external_id": "10996", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "RWE UK", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.618883", "long": "-5.625867", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10996", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "RWE UK", "Site Name": "Clachaig Glen", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8000", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Kintyre Peninsula, approximately 20km north of Campbeltown and 1.8km north east of Muasdale", "County": "Argyll and Bute", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "171789", "Y-coordinate": "642110", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002103", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.618883", "long": "-5.625867", "status": "planning", "mw": 30, "ext_id": "10996"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10996", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "RWE UK", "Site Name": "Clachaig Glen", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8000", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6119", "Address": "Kintyre Peninsula, approximately 20km north of Campbeltown and 1.8km north east of Muasdale", "County": "Argyll and Bute", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "171789", "Y-coordinate": "642110", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002103", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.618883", "long": "-5.625867", "status": "planning", "mw": 30, "ext_id": "10996"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clachaig Glen", "name_short": "Clachaig Glen", "owner": "RWE UK", "state": "scotland", "country": "uk", "lat": "55.618883", "long": "-5.625867", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.618883+-5.625867", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chleansaid Onshore Wind Farm", "city": "", "id": "659", "external_id": "10997", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "659", "external_id": "10997", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chleansaid Onshore Wind Farm", "external_id": "10997", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ESB", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.120369", "long": "-4.344434", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10997", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "ESB", "Site Name": "Chleansaid Onshore Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7711", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Dalnessie Estate, approximately 13 km northeast of Lairg", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "262000", "Y-coordinate": "917000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002031", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "58.120369", "long": "-4.344434", "status": "planning", "mw": 20, "ext_id": "10997"}, "first_month": "2022-04", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/04/2022", "to": "09/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10997", "Record Last Updated (dd/mm/yyyy)": "09/01/2024", "Operator (or Applicant)": "ESB", "Site Name": "Chleansaid Onshore Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7711", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dalnessie Estate, approximately 13 km northeast of Lairg", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "262000", "Y-coordinate": "917000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002031", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.120369", "long": "-4.344434", "status": "planning", "mw": 20, "ext_id": "10997"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chleansaid Onshore Wind Farm", "name_short": "Chleansaid Onshore Wind Farm", "owner": "ESB", "state": "scotland", "country": "uk", "lat": "58.120369", "long": "-4.344434", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.120369+-4.344434", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "city": "", "id": "660", "external_id": "7168", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Public Power Solutions (PPS) / West Sussex County Council", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "660", "external_id": "7168", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "external_id": "7168", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Public Power Solutions (PPS) / West Sussex County Council", "status": "construction", "date_first_heard": "2019-04-03", "start_construction": "2023-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.846664", "long": "-0.33157", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7168", "Record Last Updated (dd/mm/yyyy)": "11/03/2022", "Operator (or Applicant)": "Public Power Solutions (PPS) / West Sussex County Council", "Site Name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land at (former) Waste Managem, Halewick Lane, Sompting, Lancing, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "BN15 0ND", "X-coordinate": "517555", "Y-coordinate": "106564", "Planning Authority": "South Downs National Park Authority", "Planning Application Reference": "SDNP/18/06402/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.846664", "long": "-0.33157", "status": "planning", "mw": 49, "ext_id": "7168"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/03/2022", "to": "04/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/04/2022", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/08/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "03/04/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/07/2022", "to": "01/02/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7168", "Record Last Updated (dd/mm/yyyy)": "17/10/2022", "Operator (or Applicant)": "Public Power Solutions (PPS) / West Sussex County Council", "Site Name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at (former) Waste Managem, Halewick Lane, Sompting, Lancing, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "BN15 0ND", "X-coordinate": "517555", "Y-coordinate": "106564", "Planning Authority": "South Downs National Park Authority", "Planning Application Reference": "SDNP/18/06402/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/02/2023", "Operational": "", "Heat Network Ref": "", "lat": "50.846664", "long": "-0.33157", "status": "construction", "mw": 49, "ext_id": "7168"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-04-03", "start_construction": "2023-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "name_short": "Halewick Lane, Sompting - Battery-b...", "owner": "Public Power Solutions (PPS) / West Sussex County Council", "state": "south east", "country": "uk", "lat": "50.846664", "long": "-0.33157", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.846664+-0.33157", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dalmarnock Road - Battery Storage", "city": "", "id": "661", "external_id": "8507", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "661", "external_id": "8507", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dalmarnock Road - Battery Storage", "external_id": "8507", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "EcoDev Group Limited", "status": "planning", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.836236", "long": "-4.208544", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8507", "Record Last Updated (dd/mm/yyyy)": "25/03/2022", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Dalmarnock Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Dalmarnock Road, Adjacent To A749 & Downiebrae Road Rutherglen", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G73 1NY", "X-coordinate": "261783", "Y-coordinate": "662541", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/21/1525", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.836236", "long": "-4.208544", "status": "planning", "mw": 40, "ext_id": "8507"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/03/2022", "to": "11/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "16/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/05/2022", "to": "09/03/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8507", "Record Last Updated (dd/mm/yyyy)": "09/03/2021", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Dalmarnock Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dalmarnock Road, Adjacent To A749 & Downiebrae Road Rutherglen", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G73 1NY", "X-coordinate": "261783", "Y-coordinate": "662541", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/21/1525", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.836236", "long": "-4.208544", "status": "planning", "mw": 40, "ext_id": "8507"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dalmarnock Road - Battery Storage", "name_short": "Dalmarnock Road", "owner": "EcoDev Group Limited", "state": "scotland", "country": "uk", "lat": "55.836236", "long": "-4.208544", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.836236+-4.208544", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Colton - Solar photovoltaic farm, Battery storage", "city": "", "id": "662", "external_id": "10945", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "662", "external_id": "10945", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Colton - Solar photovoltaic farm, Battery storage", "external_id": "10945", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Pathfinder Clean Energy UK Dev Limited", "status": "planning", "date_first_heard": "2022-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.647306", "long": "1.089756", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10945", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Colton - Solar photovoltaic farm, Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10945", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "E/O Barnham Broom Road Colton ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR9 5DE", "X-coordinate": "609117", "Y-coordinate": "309989", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2022/0509", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.647306", "long": "1.089756", "status": "planning", "mw": 30, "ext_id": "10945"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/04/2022", "to": "08/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/06/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/07/2022", "to": "05/01/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10945", "Record Last Updated (dd/mm/yyyy)": "05/01/2024", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Colton - Solar photovoltaic farm, Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10945", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Barnham Broom Road Colton ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR9 5DE", "X-coordinate": "609117", "Y-coordinate": "309989", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2022/0509", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.647306", "long": "1.089756", "status": "planning", "mw": 30, "ext_id": "10945"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Colton - Solar photovoltaic farm, Battery storage", "name_short": "Colton - Solar photovoltaic farm,", "owner": "Pathfinder Clean Energy UK Dev Limited", "state": "eastern", "country": "uk", "lat": "52.647306", "long": "1.089756", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.647306+1.089756", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Burcot Solar Farm", "city": "", "id": "663", "external_id": "9374", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Burcot Solar Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "663", "external_id": "9374", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Burcot Solar Farm", "external_id": "9374", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Burcot Solar Farm Limited", "status": "planning", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.658553", "long": "-1.181122", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9374", "Record Last Updated (dd/mm/yyyy)": "27/06/2023", "Operator (or Applicant)": "Burcot Solar Farm Limited", "Site Name": "Burcot Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9373", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15444", "Are they re-applying (Old REPD Ref) ": "", "Address": "Burcot Farm Burcot", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX14", "X-coordinate": "456741", "Y-coordinate": "195847", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P22/S0960/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "06/12/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.658553", "long": "-1.181122", "status": "planning", "mw": 49, "ext_id": "9374"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9374", "Record Last Updated (dd/mm/yyyy)": "27/06/2023", "Operator (or Applicant)": "Burcot Solar Farm Limited", "Site Name": "Burcot Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9373", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15444", "Are they re-applying (Old REPD Ref) ": "", "Address": "Burcot Farm Burcot", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX14", "X-coordinate": "456741", "Y-coordinate": "195847", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P22/S0960/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "06/12/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.658553", "long": "-1.181122", "status": "planning", "mw": 49, "ext_id": "9374"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Burcot Solar Farm", "name_short": "Burcot Solar Farm", "owner": "Burcot Solar Farm Limited", "state": "south east", "country": "uk", "lat": "51.658553", "long": "-1.181122", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.658553+-1.181122", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penstone Lane, Penn 1 - Battery Storage Facility", "city": "", "id": "664", "external_id": "10705", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "664", "external_id": "10705", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penstone Lane, Penn 1 - Battery Storage Facility", "external_id": "10705", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Anglo Renewables Limited", "status": "planning", "date_first_heard": "2022-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.560322", "long": "-2.206367", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10705", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Penstone Lane, Penn 1 - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Field At (Penn 1) Penstone Lane Lower Penn ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XD", "X-coordinate": "386107", "Y-coordinate": "295852", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "22/00044/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.560322", "long": "-2.206367", "status": "planning", "mw": 50, "ext_id": "10705"}, "first_month": "2022-04", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/03/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "11/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "01/03/2022", "extra": "", "change_type": "misc"}, {"name": "County", "from": "West Midlands", "to": "Staffordshire", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10705", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Penstone Lane, Penn 1 - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Field At (Penn 1) Penstone Lane Lower Penn ", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XD", "X-coordinate": "386107", "Y-coordinate": "295852", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "22/00044/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.560322", "long": "-2.206367", "status": "planning", "mw": 50, "ext_id": "10705"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penstone Lane, Penn 1 - Battery Storage Facility", "name_short": "Penstone Lane, Penn 1", "owner": "Anglo Renewables Limited", "state": "west midlands", "country": "uk", "lat": "52.560322", "long": "-2.206367", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.560322+-2.206367", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penstone Lane, Lower Penn 2 - Battery Storage", "city": "", "id": "665", "external_id": "10733", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "665", "external_id": "10733", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penstone Lane, Lower Penn 2 - Battery Storage", "external_id": "10733", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Anglo Renewables Limited", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.560286", "long": "-2.206367", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10733", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Penstone Lane, Lower Penn 2 - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "(Penn 2) Penstone Lane Lower Penn ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XD", "X-coordinate": "386107", "Y-coordinate": "295848", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "22/00045/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.560286", "long": "-2.206367", "status": "planning", "mw": 50, "ext_id": "10733"}, "first_month": "2022-04", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/03/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "29/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "04/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10733", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Penstone Lane, Lower Penn 2 - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "(Penn 2) Penstone Lane Lower Penn ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XD", "X-coordinate": "386107", "Y-coordinate": "295848", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "22/00045/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.560286", "long": "-2.206367", "status": "planning", "mw": 50, "ext_id": "10733"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penstone Lane, Lower Penn 2 - Battery Storage", "name_short": "Penstone Lane, Lower Penn 2", "owner": "Anglo Renewables Limited", "state": "west midlands", "country": "uk", "lat": "52.560286", "long": "-2.206367", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.560286+-2.206367", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "city": "", "id": "666", "external_id": "10978", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "666", "external_id": "10978", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "external_id": "10978", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Novus Renewable Services Limited", "status": "planning", "date_first_heard": "2023-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.94733", "long": "-2.020332", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10978", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10978", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Upper Newton Farm, Draycott Road, Upper Tean", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST10 4JN", "X-coordinate": "398731", "Y-coordinate": "338883", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2022/0160", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.94733", "long": "-2.020332", "status": "planning", "mw": 30, "ext_id": "10978"}, "first_month": "2022-04", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2022", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/02/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2023", "to": "11/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10978", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10978", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Upper Newton Farm, Draycott Road, Upper Tean", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST10 4JN", "X-coordinate": "398731", "Y-coordinate": "338883", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2022/0160", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.94733", "long": "-2.020332", "status": "planning", "mw": 30, "ext_id": "10978"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "name_short": "Upper Newton Farm, Upper Tean - Sol...", "owner": "Novus Renewable Services Limited", "state": "west midlands", "country": "uk", "lat": "52.94733", "long": "-2.020332", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.94733+-2.020332", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Shindour - Energy Storage Facility", "city": "", "id": "668", "external_id": "8464", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "668", "external_id": "8464", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Shindour - Energy Storage Facility", "external_id": "8464", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gigabox Developments Limited", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.186478", "long": "-3.963437", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8464", "Record Last Updated (dd/mm/yyyy)": "18/01/2022", "Operator (or Applicant)": "Gigabox Developments Limited", "Site Name": "Shindour - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Shindour Feddal Hill Wood Braco, Dunblane", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK15", "X-coordinate": "278239", "Y-coordinate": "701052", "Planning Authority": "Tayside Council", "Planning Application Reference": "21/00756/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.186478", "long": "-3.963437", "status": "planning", "mw": 49, "ext_id": "8464"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/01/2022", "to": "28/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/12/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/07/2022", "to": "11/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2022", "to": "28/05/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8464", "Record Last Updated (dd/mm/yyyy)": "28/05/2021", "Operator (or Applicant)": "Gigabox Developments Limited", "Site Name": "Shindour - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Shindour Feddal Hill Wood Braco, Dunblane", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK15", "X-coordinate": "278239", "Y-coordinate": "701052", "Planning Authority": "Tayside Council", "Planning Application Reference": "21/00756/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.186478", "long": "-3.963437", "status": "planning", "mw": 49, "ext_id": "8464"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Shindour - Energy Storage Facility", "name_short": "Shindour - Energy", "owner": "Gigabox Developments Limited", "state": "scotland", "country": "uk", "lat": "56.186478", "long": "-3.963437", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.186478+-3.963437", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upton Lane, Nursling - Battery Storage Facility", "city": "", "id": "669", "external_id": "9673", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "669", "external_id": "9673", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Upton Lane, Nursling - Battery Storage Facility", "external_id": "9673", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Unknown", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.949215", "long": "-1.471777", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9673", "Record Last Updated (dd/mm/yyyy)": "10/02/2022", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "Upton Lane, Nursling - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Upton Lane Nursling Southampton", "County": "Hampshire ", "Region": "South East", "Country": "England", "Post Code": "SO16 0XY", "X-coordinate": "437203", "Y-coordinate": "116775", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "21/02799/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.949215", "long": "-1.471777", "status": "planning", "mw": 50, "ext_id": "9673"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/01/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/02/2022", "to": "22/09/2021", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Balance Power Projects Limited", "to": "Unknown", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9673", "Record Last Updated (dd/mm/yyyy)": "22/09/2021", "Operator (or Applicant)": "Unknown", "Site Name": "Upton Lane, Nursling - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Upton Lane Nursling Southampton", "County": "Hampshire ", "Region": "South East", "Country": "England", "Post Code": "SO16 0XY", "X-coordinate": "437203", "Y-coordinate": "116775", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "21/02799/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/01/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.949215", "long": "-1.471777", "status": "planning", "mw": 50, "ext_id": "9673"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Upton Lane, Nursling - Battery Storage Facility", "name_short": "Upton Lane, Nursling", "owner": "Unknown", "state": "south east", "country": "uk", "lat": "50.949215", "long": "-1.471777", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.949215+-1.471777", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Claydon Farm - Solar Farm & Battery Storage", "city": "", "id": "670", "external_id": "8039", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects 17 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "670", "external_id": "8039", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Claydon Farm - Solar Farm & Battery Storage", "external_id": "8039", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "JBM Solar Projects 17 Limited", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.981684", "long": "-2.099851", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8039", "Record Last Updated (dd/mm/yyyy)": "18/01/2022", "Operator (or Applicant)": "JBM Solar Projects 17 Limited", "Site Name": "Claydon Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8038", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Claydon Farm Claydon Tewkesbury ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL20 7BH", "X-coordinate": "393239", "Y-coordinate": "231474", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "21/00259/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.981684", "long": "-2.099851", "status": "planning", "mw": 49, "ext_id": "8039"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/01/2022", "to": "10/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "17/12/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/05/2022", "to": "07/02/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8039", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "JBM Solar Projects 17 Limited", "Site Name": "Claydon Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8038", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Claydon Farm Claydon Tewkesbury ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL20 7BH", "X-coordinate": "393239", "Y-coordinate": "231474", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "21/00259/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.981684", "long": "-2.099851", "status": "planning", "mw": 49, "ext_id": "8039"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Claydon Farm - Solar Farm & Battery Storage", "name_short": "Claydon Farm - Solar Farm &", "owner": "JBM Solar Projects 17 Limited", "state": "south west", "country": "uk", "lat": "51.981684", "long": "-2.099851", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.981684+-2.099851", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Crow Solar Park", "city": "", "id": "672", "external_id": "7175", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "INRG Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "672", "external_id": "7175", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Little Crow Solar Park", "external_id": "7175", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 90, "power_mw": 90, "owner": "INRG Solar", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.596939", "long": "-0.594485", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7175", "Record Last Updated (dd/mm/yyyy)": "07/04/2022", "Operator (or Applicant)": "INRG Solar", "Site Name": "Little Crow Solar Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6557", "Installed Capacity (MWelec)": "90.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land located 0.6km to the east of the British Steel site at Scunthorpe, ", "County": "Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN16 1XP", "X-coordinate": "493116", "Y-coordinate": "412070", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010101", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.596939", "long": "-0.594485", "status": "planning", "mw": 90, "ext_id": "7175"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/04/2027", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/04/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "07/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7175", "Record Last Updated (dd/mm/yyyy)": "07/04/2022", "Operator (or Applicant)": "INRG Solar", "Site Name": "Little Crow Solar Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6557", "Installed Capacity (MWelec)": "90", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land located 0.6km to the east of the British Steel site at Scunthorpe, ", "County": "Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN16 1XP", "X-coordinate": "493116", "Y-coordinate": "412070", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010101", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/04/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.596939", "long": "-0.594485", "status": "planning", "mw": 90, "ext_id": "7175"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 90, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "planning", "status_class": "", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Little Crow Solar Park", "name_short": "Little Crow Solar Park", "owner": "INRG Solar", "state": "yorkshire and humber", "country": "uk", "lat": "53.596939", "long": "-0.594485", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.596939+-0.594485", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grendon Lakes, Grendon - Battery Storage Facility", "city": "", "id": "675", "external_id": "10955", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "675", "external_id": "10955", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grendon Lakes, Grendon - Battery Storage Facility", "external_id": "10955", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.244024", "long": "-0.722824", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10955", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes, Grendon - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14321", "Are they re-applying (Old REPD Ref) ": "9341", "Address": "Grendon Lakes, Main Road, Grendon ", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW ", "X-coordinate": "487299", "Y-coordinate": "261417", "Planning Authority": "Wellingborough Borough Council", "Planning Application Reference": "NW/22/00198/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "11/01/2023", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.244024", "long": "-0.722824", "status": "planning", "mw": 49, "ext_id": "10955"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10955", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes, Grendon - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14321", "Are they re-applying (Old REPD Ref) ": "9341", "Address": "Grendon Lakes, Main Road, Grendon ", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW ", "X-coordinate": "487299", "Y-coordinate": "261417", "Planning Authority": "Wellingborough Borough Council", "Planning Application Reference": "NW/22/00198/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "11/01/2023", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.244024", "long": "-0.722824", "status": "planning", "mw": 49, "ext_id": "10955"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grendon Lakes, Grendon - Battery Storage Facility", "name_short": "Grendon Lakes, Grendon", "owner": "Statera Energy", "state": "east midlands", "country": "uk", "lat": "52.244024", "long": "-0.722824", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.244024+-0.722824", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drumshoreland Road Battery Storage Facility", "city": "", "id": "676", "external_id": "8920", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Sirius Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "676", "external_id": "8920", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drumshoreland Road Battery Storage Facility", "external_id": "8920", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Sirius Renewables", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.892759", "long": "-3.481258", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8920", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Sirius Renewables", "Site Name": "Drumshoreland Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "\ufffdSite At Drumshoreland Road Pumpherston", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH53", "X-coordinate": "307461", "Y-coordinate": "667617", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0255/FUL/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.892759", "long": "-3.481258", "status": "planning", "mw": 49, "ext_id": "8920"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2022", "to": "15/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "07/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/07/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8920", "Record Last Updated (dd/mm/yyyy)": "15/08/2022", "Operator (or Applicant)": "Sirius Renewables", "Site Name": "Drumshoreland Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "\ufffdSite At Drumshoreland Road Pumpherston", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH53", "X-coordinate": "307461", "Y-coordinate": "667617", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0255/FUL/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.892759", "long": "-3.481258", "status": "planning", "mw": 49, "ext_id": "8920"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drumshoreland Road Battery Storage Facility", "name_short": "Drumshoreland Road", "owner": "Sirius Renewables", "state": "scotland", "country": "uk", "lat": "55.892759", "long": "-3.481258", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.892759+-3.481258", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "city": "", "id": "677", "external_id": "10488", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "HB222BRI Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "677", "external_id": "10488", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "external_id": "10488", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 47, "power_mw": 47, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.610387", "long": "-1.97829", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10488", "Record Last Updated (dd/mm/yyyy)": "28/01/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11810", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dog Trap Lane, Minety, Malmesbury", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9PW", "X-coordinate": "401600", "Y-coordinate": "190173", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/00404", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/01/2022", "Planning Application Withdrawn": "29/06/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.610387", "long": "-1.97829", "status": "planning", "mw": 47, "ext_id": "10488"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10488", "Record Last Updated (dd/mm/yyyy)": "28/01/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11810", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dog Trap Lane, Minety, Malmesbury", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9PW", "X-coordinate": "401600", "Y-coordinate": "190173", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/00404", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/01/2022", "Planning Application Withdrawn": "29/06/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.610387", "long": "-1.97829", "status": "planning", "mw": 47, "ext_id": "10488"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 47, "mwh_is_estimate": true, "mwh": 47, "mwh_estimate": 47, "status": "planning", "status_class": "", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "name_short": "Dog Trap Lane, Minety - Battery Ene...", "owner": "Pelagic Energy", "state": "south west", "country": "uk", "lat": "51.610387", "long": "-1.97829", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.610387+-1.97829", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kenhardt 1-3", "city": "Kenhardt", "id": "693", "external_id": "", "state": "northern cape", "country": "south africa", "capacity_mwh": "1140", "estimate_mwh": "", "power_mw": "225", "customer": "", "owner": "", "developer": "scatec", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2022-10-05", "start_operation": "", "start_estimated": "", "cost_million": "1000", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "-29.345075", "long": "21.149171", "coords_hint": "3", "use_case": "540MW solar farm support", "notes": "those are 3 projects that will be built", "project_website": "https://scatec.com/locations/south-africa/#kenhardt-1-3-south-africa-540-mw", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "693", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 225, "mwh_is_estimate": false, "mwh": 1140, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2022-10-05", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kenhardt 1-3", "name_short": "Kenhardt 1-3", "owner": "", "state": "northern cape", "country": "south africa", "lat": "-29.345075", "long": "21.149171", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-29.345075+21.149171", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["those are 3 projects that will be built"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tollgate Battery Storage Facility", "city": "", "id": "726", "external_id": "6949", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "726", "external_id": "6949", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tollgate Battery Storage Facility", "external_id": "6949", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RNA Energy", "status": "planning", "date_first_heard": "2018-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.735231", "long": "-0.237166", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6949", "Record Last Updated (dd/mm/yyyy)": "23/11/2018", "Operator (or Applicant)": "RNA Energy", "Site Name": "Tollgate Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7335", "Are they re-applying (Old REPD Ref) ": "", "Address": "Tollgate Farm, Tollgate Road, North Mymms", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "AL4 0NY", "X-coordinate": "521828", "Y-coordinate": "205528", "Planning Authority": "Welwyn Hatfield Borough Council", "Planning Application Reference": "6/2017/0702/MAJ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "06/07/2017", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.735231", "long": "-0.237166", "status": "planning", "mw": 49, "ext_id": "6949"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/11/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6949", "Record Last Updated (dd/mm/yyyy)": "23/11/2018", "Operator (or Applicant)": "RNA Energy", "Site Name": "Tollgate Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7335", "Are they re-applying (Old REPD Ref) ": "", "Address": "Tollgate Farm, Tollgate Road, North Mymms", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "AL4 0NY", "X-coordinate": "521828", "Y-coordinate": "205528", "Planning Authority": "Welwyn Hatfield Borough Council", "Planning Application Reference": "6/2017/0702/MAJ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "06/07/2017", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.735231", "long": "-0.237166", "status": "planning", "mw": 49, "ext_id": "6949"}, "current_month": "2024-01", "dates": {"first_heard": "2018-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2018-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tollgate Battery Storage Facility", "name_short": "Tollgate", "owner": "RNA Energy", "state": "eastern", "country": "uk", "lat": "51.735231", "long": "-0.237166", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.735231+-0.237166", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Breach Farm", "city": "", "id": "727", "external_id": "6962", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Hedge Energy Barn", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "727", "external_id": "6962", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Breach Farm", "external_id": "6962", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Green Hedge Energy Barn", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.76666", "long": "-1.609715", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6962", "Record Last Updated (dd/mm/yyyy)": "27/05/2022", "Operator (or Applicant)": "Green Hedge Energy Barn", "Site Name": "Breach Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "6914", "Are they re-applying (Old REPD Ref) ": "", "Address": "Breach Farm, Cadley Lane, Caldwell, Swadlincote,", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE12 6RJ", "X-coordinate": "426431", "Y-coordinate": "318856", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "9/2017/0154", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/02/2017", "Planning Application Withdrawn": "05/05/2017", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.76666", "long": "-1.609715", "status": "planning", "mw": 40, "ext_id": "6962"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6962", "Record Last Updated (dd/mm/yyyy)": "27/05/2022", "Operator (or Applicant)": "Green Hedge Energy Barn", "Site Name": "Breach Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "6914", "Are they re-applying (Old REPD Ref) ": "", "Address": "Breach Farm, Cadley Lane, Caldwell, Swadlincote,", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE12 6RJ", "X-coordinate": "426431", "Y-coordinate": "318856", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "9/2017/0154", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/02/2017", "Planning Application Withdrawn": "05/05/2017", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.76666", "long": "-1.609715", "status": "planning", "mw": 40, "ext_id": "6962"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Breach Farm", "name_short": "Breach Farm", "owner": "Green Hedge Energy Barn", "state": "east midlands", "country": "uk", "lat": "52.76666", "long": "-1.609715", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.76666+-1.609715", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hilfield Farm Tech", "city": "", "id": "728", "external_id": "7030", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "728", "external_id": "7030", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hilfield Farm Tech", "external_id": "7030", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Capbal", "status": "planning", "date_first_heard": "2020-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.656597", "long": "-0.340365", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7030", "Record Last Updated (dd/mm/yyyy)": "26/03/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Hilfield Farm Tech", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8065", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hilfield Farm Hilfield Lane Aldenham Watford ", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "WD25 8DD", "X-coordinate": "514901", "Y-coordinate": "196616", "Planning Authority": "Hertsmere Borough Council", "Planning Application Reference": "18/1587/OUT ", "Appeal Reference": "APP/N1920/W/19/3240825", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "28/05/2019", "Appeal Lodged": "13/11/2019", "Appeal Withdrawn": "", "Appeal Refused": "24/03/2020", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.656597", "long": "-0.340365", "status": "planning", "mw": 49, "ext_id": "7030"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/03/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "26/03/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7030", "Record Last Updated (dd/mm/yyyy)": "26/03/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Hilfield Farm Tech", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8065", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hilfield Farm Hilfield Lane Aldenham Watford ", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "WD25 8DD", "X-coordinate": "514901", "Y-coordinate": "196616", "Planning Authority": "Hertsmere Borough Council", "Planning Application Reference": "18/1587/OUT ", "Appeal Reference": "APP/N1920/W/19/3240825", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "28/05/2019", "Appeal Lodged": "13/11/2019", "Appeal Withdrawn": "", "Appeal Refused": "24/03/2020", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.656597", "long": "-0.340365", "status": "planning", "mw": 49, "ext_id": "7030"}, "current_month": "2024-01", "dates": {"first_heard": "2020-03-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hilfield Farm Tech", "name_short": "Hilfield Farm Tech", "owner": "Capbal", "state": "eastern", "country": "uk", "lat": "51.656597", "long": "-0.340365", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.656597+-0.340365", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lackenby", "city": "", "id": "729", "external_id": "7040", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "729", "external_id": "7040", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lackenby", "external_id": "7040", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2017-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.566653", "long": "-1.125293", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7040", "Record Last Updated (dd/mm/yyyy)": "23/07/2019", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Lackenby", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7518", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at, Crow Lane, Old Lackenby, Middlesbrough", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8DN", "X-coordinate": "456654", "Y-coordinate": "519399", "Planning Authority": "Redcar and Cleveland Borough Council", "Planning Application Reference": "R/2017/0564/FF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.566653", "long": "-1.125293", "status": "planning", "mw": 49, "ext_id": "7040"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/07/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/07/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7040", "Record Last Updated (dd/mm/yyyy)": "23/07/2019", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Lackenby", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7518", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at, Crow Lane, Old Lackenby, Middlesbrough", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8DN", "X-coordinate": "456654", "Y-coordinate": "519399", "Planning Authority": "Redcar and Cleveland Borough Council", "Planning Application Reference": "R/2017/0564/FF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.566653", "long": "-1.125293", "status": "planning", "mw": 49, "ext_id": "7040"}, "current_month": "2024-01", "dates": {"first_heard": "2019-07-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2017-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lackenby", "name_short": "Lackenby", "owner": "EDF Energy Renewables", "state": "north east", "country": "uk", "lat": "54.566653", "long": "-1.125293", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.566653+-1.125293", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lovedean Energy Storage System", "city": "", "id": "730", "external_id": "7064", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "730", "external_id": "7064", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lovedean Energy Storage System", "external_id": "7064", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco", "status": "planning", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.915038", "long": "-1.041344", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7064", "Record Last Updated (dd/mm/yyyy)": "16/05/2019", "Operator (or Applicant)": "Anesco", "Site Name": "Lovedean Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9257", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land S/O Lovedean Electricity, Broadway Lane, Lovedean, Land west of, Waterlooville, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO8 0SG", "X-coordinate": "467489", "Y-coordinate": "113279", "Planning Authority": "East Hampshire District Council", "Planning Application Reference": "57524/001", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "07/09/2018", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "02/10/2018", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.915038", "long": "-1.041344", "status": "planning", "mw": 49, "ext_id": "7064"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/05/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "16/05/2019", "extra": "", "change_type": "misc"}, {"name": "Judicial Review", "from": "07/09/2018", "to": "43350", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7064", "Record Last Updated (dd/mm/yyyy)": "16/05/2019", "Operator (or Applicant)": "Anesco", "Site Name": "Lovedean Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9257", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land S/O Lovedean Electricity, Broadway Lane, Lovedean, Land west of, Waterlooville, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO8 0SG", "X-coordinate": "467489", "Y-coordinate": "113279", "Planning Authority": "East Hampshire District Council", "Planning Application Reference": "57524/001", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "43350", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "02/10/2018", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.915038", "long": "-1.041344", "status": "planning", "mw": 49, "ext_id": "7064"}, "current_month": "2024-01", "dates": {"first_heard": "2019-05-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lovedean Energy Storage System", "name_short": "Lovedean", "owner": "Anesco", "state": "south east", "country": "uk", "lat": "50.915038", "long": "-1.041344", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.915038+-1.041344", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gloucestershire Science and Technology Park (small)", "city": "", "id": "731", "external_id": "7181", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "731", "external_id": "7181", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gloucestershire Science and Technology Park (small)", "external_id": "7181", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "Ecotricity", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.689953", "long": "-2.498942", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7181", "Record Last Updated (dd/mm/yyyy)": "14/03/2022", "Operator (or Applicant)": "Ecotricity", "Site Name": "Gloucestershire Science and Technology Park (small)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10796", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hamfield Lane, Berkeley,", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL13 9FB", "X-coordinate": "365607", "Y-coordinate": "199140", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.17/2430/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.689953", "long": "-2.498942", "status": "planning", "mw": 32, "ext_id": "7181"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7181", "Record Last Updated (dd/mm/yyyy)": "14/03/2022", "Operator (or Applicant)": "Ecotricity", "Site Name": "Gloucestershire Science and Technology Park (small)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10796", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hamfield Lane, Berkeley,", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL13 9FB", "X-coordinate": "365607", "Y-coordinate": "199140", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.17/2430/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.689953", "long": "-2.498942", "status": "planning", "mw": 32, "ext_id": "7181"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "planning", "status_class": "", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Gloucestershire Science and Technology Park (small)", "name_short": "Gloucestershire Science and Technol...", "owner": "Ecotricity", "state": "south west", "country": "uk", "lat": "51.689953", "long": "-2.498942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.689953+-2.498942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordtown Energy Storage", "city": "", "id": "732", "external_id": "7234", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Shires Hamilton", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "732", "external_id": "7234", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordtown Energy Storage", "external_id": "7234", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Shires Hamilton", "status": "planning", "date_first_heard": "2019-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7234", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Shires Hamilton", "Site Name": "Fordtown Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7764", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2019/0373", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/03/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/08/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/08/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 20, "ext_id": "7234"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/08/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7234", "Record Last Updated (dd/mm/yyyy)": "20/08/2019", "Operator (or Applicant)": "Shires Hamilton", "Site Name": "Fordtown Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7764", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2019/0373", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/03/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/08/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/08/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 20, "ext_id": "7234"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2019-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordtown Energy Storage", "name_short": "Fordtown", "owner": "Shires Hamilton", "state": "scotland", "country": "uk", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.221396+-2.366114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tiddlywink Barn", "city": "", "id": "733", "external_id": "7527", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "McBallester", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "733", "external_id": "7527", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tiddlywink Barn", "external_id": "7527", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "McBallester", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.480148", "long": "-2.184011", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7527", "Record Last Updated (dd/mm/yyyy)": "20/12/2019", "Operator (or Applicant)": "McBallester", "Site Name": "Tiddlywink Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9552", "Are they re-applying (Old REPD Ref) ": "7073", "Address": "The Barn South East Of, 8 Tiddly Wink, Yatton Keynell, Chippenham, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14 7BY", "X-coordinate": "387318", "Y-coordinate": "175704", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/06775/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2019", "Planning Application Withdrawn": "10/09/2019", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.480148", "long": "-2.184011", "status": "planning", "mw": 10, "ext_id": "7527"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/12/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/12/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7527", "Record Last Updated (dd/mm/yyyy)": "20/12/2019", "Operator (or Applicant)": "McBallester", "Site Name": "Tiddlywink Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9552", "Are they re-applying (Old REPD Ref) ": "7073", "Address": "The Barn South East Of, 8 Tiddly Wink, Yatton Keynell, Chippenham, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14 7BY", "X-coordinate": "387318", "Y-coordinate": "175704", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/06775/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2019", "Planning Application Withdrawn": "10/09/2019", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.480148", "long": "-2.184011", "status": "planning", "mw": 10, "ext_id": "7527"}, "current_month": "2024-01", "dates": {"first_heard": "2019-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tiddlywink Barn", "name_short": "Tiddlywink Barn", "owner": "McBallester", "state": "south west", "country": "uk", "lat": "51.480148", "long": "-2.184011", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.480148+-2.184011", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitminster - Solar Farm & Battery Storage", "city": "", "id": "734", "external_id": "8844", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects 7 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "734", "external_id": "8844", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Moreton Lane - Solar Farm & Battery Storage", "external_id": "8844", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "JBM Solar Projects 7 Limited", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.795091", "long": "-2.312848", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8844", "Record Last Updated (dd/mm/yyyy)": "28/04/2022", "Operator (or Applicant)": "JBM Solar Projects 7 Limited", "Site Name": "Whitminster - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8843", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Parcels A & B Near Whitminster Gloucestershire", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7PN", "X-coordinate": "378521", "Y-coordinate": "210762", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.21/0465/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.795091", "long": "-2.312848", "status": "planning", "mw": 49, "ext_id": "8844"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Site Name", "from": "Whitminster - Solar Farm & Battery Storage", "to": "Moreton Lane - Solar Farm & Battery Storage", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8844", "Record Last Updated (dd/mm/yyyy)": "28/04/2022", "Operator (or Applicant)": "JBM Solar Projects 7 Limited", "Site Name": "Moreton Lane - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8843", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Parcels A & B Near Whitminster Gloucestershire", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7PN", "X-coordinate": "378521", "Y-coordinate": "210762", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.21/0465/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.795091", "long": "-2.312848", "status": "planning", "mw": 49, "ext_id": "8844"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Moreton Lane - Solar Farm & Battery Storage", "name_short": "Moreton Lane - Solar Farm &", "owner": "JBM Solar Projects 7 Limited", "state": "south west", "country": "uk", "lat": "51.795091", "long": "-2.312848", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.795091+-2.312848", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "East Kilbride - Battery storage", "city": "", "id": "735", "external_id": "9013", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Cathkin Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "735", "external_id": "9013", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Kilbride - Battery storage", "external_id": "9013", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Engie Regeneration Limited", "status": "planning", "date_first_heard": "2022-08-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.333568", "long": "-3.444319", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9013", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Cathkin Energy Storage Limited", "Site Name": "East Kilbride - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North E/O East Kilbride, 275kv Grid Substation, Cairnmuir Road, East Kilbride, Moffat", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "308476", "Y-coordinate": "605341", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/22/0472", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.333568", "long": "-3.444319", "status": "planning", "mw": 49, "ext_id": "9013"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "04/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "22/08/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/08/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/11/2022", "to": "15/12/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Cathkin Energy Storage Limited", "to": "Engie Regeneration Limited", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9013", "Record Last Updated (dd/mm/yyyy)": "15/12/2023", "Operator (or Applicant)": "Engie Regeneration Limited", "Site Name": "East Kilbride - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North E/O East Kilbride, 275kv Grid Substation, Cairnmuir Road, East Kilbride, Moffat", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "308476", "Y-coordinate": "605341", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/22/0472", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.333568", "long": "-3.444319", "status": "planning", "mw": 49, "ext_id": "9013"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-08-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Kilbride - Battery storage", "name_short": "East Kilbride", "owner": "Engie Regeneration Limited", "state": "scotland", "country": "uk", "lat": "55.333568", "long": "-3.444319", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.333568+-3.444319", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Devilla Energy Storage Facility", "city": "", "id": "736", "external_id": "9248", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "736", "external_id": "9248", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Devilla Energy Storage Facility", "external_id": "9248", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Alcemi Storage Development Limited", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.131264", "long": "-3.782862", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9248", "Record Last Updated (dd/mm/yyyy)": "24/05/2022", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Devilla Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Devilla Forest, Kincardine, Alloa", "County": "Clackmannanshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK10", "X-coordinate": "289286", "Y-coordinate": "694603", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003469", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.131264", "long": "-3.782862", "status": "planning", "mw": 500, "ext_id": "9248"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2022", "to": "09/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/12/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9248", "Record Last Updated (dd/mm/yyyy)": "09/01/2024", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Devilla Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Devilla Forest, Kincardine, Alloa", "County": "Clackmannanshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK10", "X-coordinate": "289286", "Y-coordinate": "694603", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003469", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/12/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.131264", "long": "-3.782862", "status": "planning", "mw": 500, "ext_id": "9248"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Devilla Energy Storage Facility", "name_short": "Devilla Energy", "owner": "Alcemi Storage Development Limited", "state": "scotland", "country": "uk", "lat": "56.131264", "long": "-3.782862", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.131264+-3.782862", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hales Lane - Battery Storage Facility", "city": "", "id": "737", "external_id": "9635", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "737", "external_id": "9635", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hales Lane - Battery Storage Facility", "external_id": "9635", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Aura Power ", "status": "planning", "date_first_heard": "2022-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.725882", "long": "-0.984842", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9635", "Record Last Updated (dd/mm/yyyy)": "19/05/2022", "Operator (or Applicant)": "Aura Power ", "Site Name": "Hales Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hales Lane, Drax, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PL", "X-coordinate": "467078", "Y-coordinate": "425976", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/1089/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.725882", "long": "-0.984842", "status": "planning", "mw": 100, "ext_id": "9635"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9635", "Record Last Updated (dd/mm/yyyy)": "19/05/2022", "Operator (or Applicant)": "Aura Power ", "Site Name": "Hales Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hales Lane, Drax, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PL", "X-coordinate": "467078", "Y-coordinate": "425976", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/1089/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.725882", "long": "-0.984842", "status": "planning", "mw": 100, "ext_id": "9635"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hales Lane - Battery Storage Facility", "name_short": "Hales Lane", "owner": "Aura Power ", "state": "yorkshire and humber", "country": "uk", "lat": "53.725882", "long": "-0.984842", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.725882+-0.984842", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drum Farm - Battery Energy Storage System", "city": "", "id": "738", "external_id": "9940", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy System Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "738", "external_id": "9940", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drum Farm - Battery Energy Storage System", "external_id": "9940", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Renewable Energy System Limited", "status": "planning", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.542968", "long": "-2.929822", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9940", "Record Last Updated (dd/mm/yyyy)": "18/05/2022", "Operator (or Applicant)": "Renewable Energy System Limited", "Site Name": "Drum Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Drum Farm, Keith", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NP", "X-coordinate": "344439", "Y-coordinate": "850697", "Planning Authority": "Moray Council", "Planning Application Reference": "22/00715/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.542968", "long": "-2.929822", "status": "planning", "mw": 49, "ext_id": "9940"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2022", "to": "22/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "27/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/10/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/11/2022", "to": "17/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9940", "Record Last Updated (dd/mm/yyyy)": "17/11/2021", "Operator (or Applicant)": "Renewable Energy System Limited", "Site Name": "Drum Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Drum Farm, Keith", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NP", "X-coordinate": "344439", "Y-coordinate": "850697", "Planning Authority": "Moray Council", "Planning Application Reference": "22/00715/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/10/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.542968", "long": "-2.929822", "status": "planning", "mw": 49, "ext_id": "9940"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drum Farm - Battery Energy Storage System", "name_short": "Drum Farm - Battery", "owner": "Renewable Energy System Limited", "state": "scotland", "country": "uk", "lat": "57.542968", "long": "-2.929822", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.542968+-2.929822", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane - Battery Storage", "city": "", "id": "739", "external_id": "10145", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "739", "external_id": "10145", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane - Battery Storage", "external_id": "10145", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "status": "planning", "date_first_heard": "2022-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.717709", "long": "-1.27556", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10145", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "Site Name": "Kirkhaw Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8430", "Address": "Industrial Pallet & Transport Services Kirkhaw Lane Knottingley ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447906", "Y-coordinate": "424832", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02937/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.717709", "long": "-1.27556", "status": "planning", "mw": 32, "ext_id": "10145"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/03/2022", "to": "19/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10145", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "Site Name": "Kirkhaw Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8430", "Address": "Industrial Pallet & Transport Services Kirkhaw Lane Knottingley ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447906", "Y-coordinate": "424832", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02937/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.717709", "long": "-1.27556", "status": "planning", "mw": 32, "ext_id": "10145"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "planning", "status_class": "", "date_first_heard": "2022-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane - Battery Storage", "name_short": "Kirkhaw Lane", "owner": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.717709", "long": "-1.27556", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.717709+-1.27556", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newburgh Road, Abernethy - Battery Storage ", "city": "", "id": "741", "external_id": "10607", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "P & M Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "741", "external_id": "10607", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newburgh Road, Abernethy - Battery Storage ", "external_id": "10607", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "P & M Energy Limited", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10607", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "P & M Energy Limited", "Site Name": "Newburgh Road, Abernethy - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "60 Metres North Of Abernethy Cemetery Newburgh Road Abernethy ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/00746/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "planning", "mw": 49, "ext_id": "10607"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2022", "to": "25/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "26/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/10/2022", "to": "11/02/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10607", "Record Last Updated (dd/mm/yyyy)": "11/02/2022", "Operator (or Applicant)": "P & M Energy Limited", "Site Name": "Newburgh Road, Abernethy - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "60 Metres North Of Abernethy Cemetery Newburgh Road Abernethy ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/00746/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "planning", "mw": 49, "ext_id": "10607"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newburgh Road, Abernethy - Battery Storage ", "name_short": "Newburgh Road, Abernethy - Battery ...", "owner": "P & M Energy Limited", "state": "scotland", "country": "uk", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.347678+-3.298351", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Sleekburn - Battery Storage Compound", "city": "", "id": "743", "external_id": "10957", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Enviromena Asset Management UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "743", "external_id": "10957", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Sleekburn - Battery Storage Compound", "external_id": "10957", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Enviromena Asset Management UK Limited", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.157567", "long": "-1.544096", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10957", "Record Last Updated (dd/mm/yyyy)": "29/06/2022", "Operator (or Applicant)": "Enviromena Asset Management UK Limited", "Site Name": "West Sleekburn - Battery Storage Compound", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Sleekburn, Bedlington", "County": "Northumberland", "Region": "North East", "Country": "England", "Post Code": "NE22 7DB ", "X-coordinate": "429148", "Y-coordinate": "584899", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "22/01725/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.157567", "long": "-1.544096", "status": "planning", "mw": 30, "ext_id": "10957"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/06/2022", "to": "21/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "19/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "19/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/10/2022", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10957", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Enviromena Asset Management UK Limited", "Site Name": "West Sleekburn - Battery Storage Compound", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Sleekburn, Bedlington", "County": "Northumberland", "Region": "North East", "Country": "England", "Post Code": "NE22 7DB ", "X-coordinate": "429148", "Y-coordinate": "584899", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "22/01725/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.157567", "long": "-1.544096", "status": "planning", "mw": 30, "ext_id": "10957"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Sleekburn - Battery Storage Compound", "name_short": "West Sleekburn - Battery Storage Co...", "owner": "Enviromena Asset Management UK Limited", "state": "north east", "country": "uk", "lat": "55.157567", "long": "-1.544096", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.157567+-1.544096", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Maybrook Road - Battery facility", "city": "", "id": "744", "external_id": "11008", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Conrad Energy (Develeopments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "744", "external_id": "11008", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Maybrook Road - Battery facility", "external_id": "11008", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "Conrad Energy (Develeopments) Limited", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.529587", "long": "-1.788339", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11008", "Record Last Updated (dd/mm/yyyy)": "19/04/2022", "Operator (or Applicant)": "Conrad Energy (Develeopments) Limited", "Site Name": "Maybrook Road - Battery facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13.1", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Maybrook Business Park - Unit 6 Maybrook Road Sutton Coldfield ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B76 1AL\ufffd", "X-coordinate": "414456", "Y-coordinate": "292434", "Planning Authority": "Birmingham City Council", "Planning Application Reference": "2022/01927/PA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.529587", "long": "-1.788339", "status": "planning", "mw": 13, "ext_id": "11008"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2022", "to": "18/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/08/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/08/2022", "to": "19/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11008", "Record Last Updated (dd/mm/yyyy)": "19/04/2022", "Operator (or Applicant)": "Conrad Energy (Develeopments) Limited", "Site Name": "Maybrook Road - Battery facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13.1", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Maybrook Business Park - Unit 6 Maybrook Road Sutton Coldfield ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B76 1AL\ufffd", "X-coordinate": "414456", "Y-coordinate": "292434", "Planning Authority": "Birmingham City Council", "Planning Application Reference": "2022/01927/PA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.529587", "long": "-1.788339", "status": "planning", "mw": 13, "ext_id": "11008"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "planning", "status_class": "", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Maybrook Road - Battery facility", "name_short": "Maybrook Road - Battery facility", "owner": "Conrad Energy (Develeopments) Limited", "state": "west midlands", "country": "uk", "lat": "52.529587", "long": "-1.788339", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.529587+-1.788339", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "city": "", "id": "745", "external_id": "11092", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "745", "external_id": "11092", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "external_id": "11092", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Conrad Energy (Developments) Limited", "status": "planning", "date_first_heard": "2023-04-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.213221", "long": "-2.38143", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11092", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Conrad Energy (Developments) Limited", "Site Name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "450m Nw/O South Leylodge Farmhouse, Kintore", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XY", "X-coordinate": "377060", "Y-coordinate": "813671", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "ENQ/2022/0562 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.213221", "long": "-2.38143", "status": "planning", "mw": 49, "ext_id": "11092"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "11/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "ENQ/2022/0562 ", "to": "APP/2022/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "14/04/2022", "to": "30/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/10/2022", "to": "02/05/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/04/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/04/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/05/2023", "to": "27/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11092", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Conrad Energy (Developments) Limited", "Site Name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "450m Nw/O South Leylodge Farmhouse, Kintore", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XY", "X-coordinate": "377060", "Y-coordinate": "813671", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2022", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/04/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.213221", "long": "-2.38143", "status": "planning", "mw": 49, "ext_id": "11092"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-04-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "name_short": "South Leylodge Farmhouse, Kintore -...", "owner": "Conrad Energy (Developments) Limited", "state": "scotland", "country": "uk", "lat": "57.213221", "long": "-2.38143", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.213221+-2.38143", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tealing Battery Energy Storage Farm", "city": "", "id": "746", "external_id": "11097", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Sirius EcoDev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "746", "external_id": "11097", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tealing Battery Energy Storage Farm", "external_id": "11097", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Sirius EcoDev Limited", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.509108", "long": "-2.883199", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11097", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Sirius EcoDev Limited", "Site Name": "Tealing Battery Energy Storage Farm", "Technology Type": "Battery", "Storage Type": "", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "800m Ne/O Gagie Farm, Kellas", "County": "Angus ", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD5", "X-coordinate": "345741", "Y-coordinate": "735577", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003354", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.509108", "long": "-2.883199", "status": "planning", "mw": 80, "ext_id": "11097"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Type", "from": "", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "29/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/11/2022", "to": "09/01/2024", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Stand-alone Storage", "to": "Co-located with RE", "extra": "", "change_type": "misc"}, {"name": "Storage Co-location REPD Ref ID", "from": "", "to": "14543", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/12/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11097", "Record Last Updated (dd/mm/yyyy)": "09/01/2024", "Operator (or Applicant)": "Sirius EcoDev Limited", "Site Name": "Tealing Battery Energy Storage Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14543", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "800m Ne/O Gagie Farm, Kellas", "County": "Angus ", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD5", "X-coordinate": "345741", "Y-coordinate": "735577", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003354", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/12/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.509108", "long": "-2.883199", "status": "planning", "mw": 80, "ext_id": "11097"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tealing Battery Energy Storage Farm", "name_short": "Tealing Battery Energy Storage Far...", "owner": "Sirius EcoDev Limited", "state": "scotland", "country": "uk", "lat": "56.509108", "long": "-2.883199", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.509108+-2.883199", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grayside Wind Farm", "city": "", "id": "747", "external_id": "11113", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Grayside WF", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "747", "external_id": "11113", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grayside Wind Farm", "external_id": "11113", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Grayside WF", "status": "planning", "date_first_heard": "2022-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.538094", "long": "-3.589297", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11113", "Record Last Updated (dd/mm/yyyy)": "04/05/2022", "Operator (or Applicant)": "Grayside WF", "Site Name": "Grayside Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8003", "Installed Capacity (MWelec)": "20", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "7", "No. of Turbines": "21", "Height of Turbines (m)": "200", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Approximately 1.7km south of Lamington and 5.7km north east of Abington", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML12 6QD", "X-coordinate": "299800", "Y-coordinate": "628300", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003446", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.538094", "long": "-3.589297", "status": "planning", "mw": 20, "ext_id": "11113"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "CfD Capacity (MW)", "from": "", "to": "7", "extra": "", "change_type": "misc"}, {"name": "Turbine Capacity (MW)", "from": "7", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11113", "Record Last Updated (dd/mm/yyyy)": "04/05/2022", "Operator (or Applicant)": "Grayside WF", "Site Name": "Grayside Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8003", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "7", "Turbine Capacity (MW)": "", "No. of Turbines": "21", "Height of Turbines (m)": "200", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Approximately 1.7km south of Lamington and 5.7km north east of Abington", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML12 6QD", "X-coordinate": "299800", "Y-coordinate": "628300", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003446", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.538094", "long": "-3.589297", "status": "planning", "mw": 20, "ext_id": "11113"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grayside Wind Farm", "name_short": "Grayside Wind Farm", "owner": "Grayside WF", "state": "scotland", "country": "uk", "lat": "55.538094", "long": "-3.589297", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.538094+-3.589297", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chadderton - Battery energy storage facility", "city": "", "id": "748", "external_id": "11160", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Field", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-06-01", "start_construction": "2021-12-20", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "748", "external_id": "11160", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chadderton - Battery energy storage facility", "external_id": "11160", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Field", "status": "construction", "date_first_heard": "2022-06-01", "start_construction": "2021-12-20", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.531102", "long": "-2.166", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11160", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "Field", "Site Name": "Chadderton - Battery energy storage facility", "Technology Type": "Battery", "Storage Type": "", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Unit 12 Howarth Court Gateway Crescent Chadderton Oldham ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL9 9XB", "X-coordinate": "389094", "Y-coordinate": "403840", "Planning Authority": "Oldham Council", "Planning Application Reference": "FUL/348758/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "20/12/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.531102", "long": "-2.166", "status": "construction", "mw": 20, "ext_id": "11160"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Type", "from": "", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2022", "to": "09/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11160", "Record Last Updated (dd/mm/yyyy)": "09/05/2022", "Operator (or Applicant)": "Field", "Site Name": "Chadderton - Battery energy storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Unit 12 Howarth Court Gateway Crescent Chadderton Oldham ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL9 9XB", "X-coordinate": "389094", "Y-coordinate": "403840", "Planning Authority": "Oldham Council", "Planning Application Reference": "FUL/348758/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "20/12/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.531102", "long": "-2.166", "status": "construction", "mw": 20, "ext_id": "11160"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-06-01", "start_construction": "2021-12-20", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chadderton - Battery energy storage facility", "name_short": "Chadderton - Battery energy", "owner": "Field", "state": "north west", "country": "uk", "lat": "53.531102", "long": "-2.166", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.531102+-2.166", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Richborough Energy Park - Phase 3", "city": "", "id": "749", "external_id": "11201", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "249", "power_mw": "249", "customer": "", "owner": "Sheaf Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "749", "external_id": "11201", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Richborough Energy Park - Phase 3 (Sheaf)", "external_id": "11201", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 249, "power_mw": 249, "owner": "Pacific Green", "status": "planning", "date_first_heard": "2022-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.31203", "long": "1.346823", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11201", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Sheaf Energy Limited", "Site Name": "Richborough Energy Park - Phase 3", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "249", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Richborough Energy Park, Sandwich Road, Ramsgate, Sandwich", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633341", "Y-coordinate": "162310", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/22/0579", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.31203", "long": "1.346823", "status": "planning", "mw": 249, "ext_id": "11201"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/05/2022", "to": "22/05/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Sheaf Energy Limited", "to": "Pacific Green", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "22/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/05/2023", "to": "10/05/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Richborough Energy Park - Phase 3", "to": "Richborough Energy Park - Phase 3 (Sheaf)", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11201", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Pacific Green", "Site Name": "Richborough Energy Park - Phase 3 (Sheaf)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "249", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Richborough Energy Park, Sandwich Road, Ramsgate, Sandwich", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633341", "Y-coordinate": "162310", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/22/0579", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.31203", "long": "1.346823", "status": "planning", "mw": 249, "ext_id": "11201"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 249, "mwh_is_estimate": true, "mwh": 249, "mwh_estimate": 249, "status": "planning", "status_class": "", "date_first_heard": "2022-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Richborough Energy Park - Phase 3 (Sheaf)", "name_short": "Richborough Energy Park - Phase 3 (...", "owner": "Pacific Green", "state": "south east", "country": "uk", "lat": "51.31203", "long": "1.346823", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.31203+1.346823", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stocking Pelham - Battery Storage System", "city": "", "id": "750", "external_id": "11212", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Connections", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "750", "external_id": "11212", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stocking Pelham - Battery Storage System", "external_id": "11212", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Renewable Connections", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.939595", "long": "0.1177", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11212", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Renewable Connections", "Site Name": "Stocking Pelham - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Crabbs Lane And Pelham Substation Stocking Pelham ", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG9", "X-coordinate": "545670", "Y-coordinate": "228906", "Planning Authority": "East Hertfordshire Council", "Planning Application Reference": "3/22/0806/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.939595", "long": "0.1177", "status": "planning", "mw": 50, "ext_id": "11212"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11212", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Renewable Connections", "Site Name": "Stocking Pelham - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Crabbs Lane And Pelham Substation Stocking Pelham ", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG9", "X-coordinate": "545670", "Y-coordinate": "228906", "Planning Authority": "East Hertfordshire Council", "Planning Application Reference": "3/22/0806/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.939595", "long": "0.1177", "status": "planning", "mw": 50, "ext_id": "11212"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stocking Pelham - Battery Storage System", "name_short": "Stocking Pelham - Battery Storage S...", "owner": "Renewable Connections", "state": "eastern", "country": "uk", "lat": "51.939595", "long": "0.1177", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.939595+0.1177", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penwortham - Battery storage", "city": "", "id": "751", "external_id": "11217", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "751", "external_id": "11217", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penwortham - Battery storage", "external_id": "11217", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Shaw-Energi Limited", "status": "planning", "date_first_heard": "2022-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.746613", "long": "-2.756297", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11217", "Record Last Updated (dd/mm/yyyy)": "24/05/2022", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "Penwortham - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Sub Station 210M From National Grid Sub Station, Howick Cross Lane 4M From Unn Howick Cross Lane Penwortham", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR1 0NS", "X-coordinate": "350221", "Y-coordinate": "428070", "Planning Authority": "South Ribble Borough Council", "Planning Application Reference": "07/2022/00021/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.746613", "long": "-2.756297", "status": "planning", "mw": 57, "ext_id": "11217"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/05/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "10/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11217", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "Penwortham - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Sub Station 210M From National Grid Sub Station, Howick Cross Lane 4M From Unn Howick Cross Lane Penwortham", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR1 0NS", "X-coordinate": "350221", "Y-coordinate": "428070", "Planning Authority": "South Ribble Borough Council", "Planning Application Reference": "07/2022/00021/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.746613", "long": "-2.756297", "status": "planning", "mw": 57, "ext_id": "11217"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2022-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penwortham - Battery storage", "name_short": "Penwortham", "owner": "Shaw-Energi Limited", "state": "north west", "country": "uk", "lat": "53.746613", "long": "-2.756297", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.746613+-2.756297", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Armadale Wind Farm", "city": "", "id": "752", "external_id": "11219", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Brookfield Renewable UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "752", "external_id": "11219", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Armadale Wind Farm", "external_id": "11219", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 42, "power_mw": 42, "owner": "Brookfield Renewable UK", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.53475", "long": "-4.076945", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11219", "Record Last Updated (dd/mm/yyyy)": "18/05/2022", "Operator (or Applicant)": "Brookfield Renewable UK", "Site Name": "Armadale Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6362", "Installed Capacity (MWelec)": "42", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 1100M South Of, Armadale Farm, Armadale, Thurso, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7SA", "X-coordinate": "279177", "Y-coordinate": "962608", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003455", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.53475", "long": "-4.076945", "status": "planning", "mw": 42, "ext_id": "11219"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2022", "to": "10/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11219", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Brookfield Renewable UK", "Site Name": "Armadale Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6362", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 1100M South Of, Armadale Farm, Armadale, Thurso, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7SA", "X-coordinate": "279177", "Y-coordinate": "962608", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003455", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.53475", "long": "-4.076945", "status": "planning", "mw": 42, "ext_id": "11219"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 42, "mwh_is_estimate": true, "mwh": 42, "mwh_estimate": 42, "status": "planning", "status_class": "", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Armadale Wind Farm", "name_short": "Armadale Wind Farm", "owner": "Brookfield Renewable UK", "state": "scotland", "country": "uk", "lat": "58.53475", "long": "-4.076945", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.53475+-4.076945", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bath Mews, Minsterley - 10MW Battery Storage Facility", "city": "", "id": "753", "external_id": "11369", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "753", "external_id": "11369", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bath Mews, Minsterley - Battery Storage Facility", "external_id": "11369", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Hydrock Consultants Limited", "status": "planning", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.639388", "long": "-2.925161", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11369", "Record Last Updated (dd/mm/yyyy)": "21/03/2023", "Operator (or Applicant)": "Hydrock Consultants Limited", "Site Name": "Bath Mews, Minsterley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13480", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Bath Mews, Minsterley, Shrewsbury", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "SY5 0BA", "X-coordinate": "337492", "Y-coordinate": "305029", "Planning Authority": "Shropshire Council", "Planning Application Reference": "22/01897/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "01/11/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.639388", "long": "-2.925161", "status": "planning", "mw": 10, "ext_id": "11369"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/03/2023", "to": "27/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11369", "Record Last Updated (dd/mm/yyyy)": "27/05/2022", "Operator (or Applicant)": "Hydrock Consultants Limited", "Site Name": "Bath Mews, Minsterley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13480", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Bath Mews, Minsterley, Shrewsbury", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "SY5 0BA", "X-coordinate": "337492", "Y-coordinate": "305029", "Planning Authority": "Shropshire Council", "Planning Application Reference": "22/01897/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "01/11/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.639388", "long": "-2.925161", "status": "planning", "mw": 10, "ext_id": "11369"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bath Mews, Minsterley - Battery Storage Facility", "name_short": "Bath Mews, Minsterley", "owner": "Hydrock Consultants Limited", "state": "west midlands", "country": "uk", "lat": "52.639388", "long": "-2.925161", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.639388+-2.925161", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lowlands Farm - Battery Storage", "city": "", "id": "754", "external_id": "11399", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "754", "external_id": "11399", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lowlands Farm - Battery Storage", "external_id": "11399", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Anglo Renewables", "status": "planning", "date_first_heard": "2023-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.432555", "long": "-2.026549", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11399", "Record Last Updated (dd/mm/yyyy)": "04/01/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Lowlands Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12959", "Are they re-applying (Old REPD Ref) ": "", "Address": "adj to M5 Motorway, Lowlands Farm, Illey Lane, Halesowen", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B62 0HJ", "X-coordinate": "398292", "Y-coordinate": "281620", "Planning Authority": "Dudley Council", "Planning Application Reference": "P22/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/08/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.432555", "long": "-2.026549", "status": "planning", "mw": 50, "ext_id": "11399"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/01/2023", "to": "06/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11399", "Record Last Updated (dd/mm/yyyy)": "06/06/2022", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Lowlands Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12959", "Are they re-applying (Old REPD Ref) ": "", "Address": "adj to M5 Motorway, Lowlands Farm, Illey Lane, Halesowen", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B62 0HJ", "X-coordinate": "398292", "Y-coordinate": "281620", "Planning Authority": "Dudley Council", "Planning Application Reference": "P22/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/08/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.432555", "long": "-2.026549", "status": "planning", "mw": 50, "ext_id": "11399"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lowlands Farm - Battery Storage", "name_short": "Lowlands Farm", "owner": "Anglo Renewables", "state": "west midlands", "country": "uk", "lat": "52.432555", "long": "-2.026549", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.432555+-2.026549", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Patch Elm Lane - Battery Storage ", "city": "", "id": "755", "external_id": "11415", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "755", "external_id": "11415", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Patch Elm Lane - Battery Storage ", "external_id": "11415", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Green Frog Ventures Limited", "status": "planning", "date_first_heard": "2022-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.569394", "long": "-2.464667", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11415", "Record Last Updated (dd/mm/yyyy)": "30/03/2022", "Operator (or Applicant)": "Green Frog Ventures Limited", "Site Name": "Patch Elm Lane - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Patch Elm Lane Rangeworthy ", "County": "South Gloucestershire ", "Region": "South West", "Country": "England", "Post Code": "BS37 7LT", "X-coordinate": "367891", "Y-coordinate": "185716", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P21/07489/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569394", "long": "-2.464667", "status": "planning", "mw": 35, "ext_id": "11415"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "18/03/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11415", "Record Last Updated (dd/mm/yyyy)": "30/03/2022", "Operator (or Applicant)": "Green Frog Ventures Limited", "Site Name": "Patch Elm Lane - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Patch Elm Lane Rangeworthy ", "County": "South Gloucestershire ", "Region": "South West", "Country": "England", "Post Code": "BS37 7LT", "X-coordinate": "367891", "Y-coordinate": "185716", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P21/07489/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569394", "long": "-2.464667", "status": "planning", "mw": 35, "ext_id": "11415"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2022-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Patch Elm Lane - Battery Storage ", "name_short": "Patch Elm Lane - Battery Storage ", "owner": "Green Frog Ventures Limited", "state": "south west", "country": "uk", "lat": "51.569394", "long": "-2.464667", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.569394+-2.464667", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brown Edge - Battery Storage", "city": "", "id": "756", "external_id": "11418", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "756", "external_id": "11418", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Brown Edge - Battery Storage", "external_id": "11418", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.07567", "long": "-2.159837", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11418", "Record Last Updated (dd/mm/yyyy)": "18/03/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Brown Edge - Battery Storage", "Technology Type": "Battery", "Storage Type": "", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.53", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bemersley Road, Brown Edge, ", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST6", "X-coordinate": "389389", "Y-coordinate": "353172", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2022/0076", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.07567", "long": "-2.159837", "status": "planning", "mw": 49, "ext_id": "11418"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Type", "from": "", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/03/2021", "to": "03/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11418", "Record Last Updated (dd/mm/yyyy)": "03/11/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Brown Edge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.53", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bemersley Road, Brown Edge, ", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST6", "X-coordinate": "389389", "Y-coordinate": "353172", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2022/0076", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.07567", "long": "-2.159837", "status": "planning", "mw": 49, "ext_id": "11418"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Brown Edge - Battery Storage", "name_short": "Brown Edge", "owner": "Anesco", "state": "west midlands", "country": "uk", "lat": "53.07567", "long": "-2.159837", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.07567+-2.159837", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Melton Electricity Substation - Energy Storage System", "city": "", "id": "757", "external_id": "11436", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "26", "customer": "", "owner": "Brampton Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "757", "external_id": "11436", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Melton Electricity Substation - Energy Storage System", "external_id": "11436", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 26, "power_mw": 26, "owner": "Brampton Energy Storage Limited", "status": "planning", "date_first_heard": "2022-09-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.500382", "long": "-1.380305", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11436", "Record Last Updated (dd/mm/yyyy)": "09/06/2022", "Operator (or Applicant)": "Brampton Energy Storage Limited", "Site Name": "West Melton Electricity Substation - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "26", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SW/O West Melton Electricity Substation Elsecar Road Brampton Bierlow", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S63 6EZ", "X-coordinate": "441204", "Y-coordinate": "400588", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/0853", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.500382", "long": "-1.380305", "status": "planning", "mw": 26, "ext_id": "11436"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/06/2022", "to": "23/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "13/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/09/2022", "to": "23/11/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11436", "Record Last Updated (dd/mm/yyyy)": "23/11/2023", "Operator (or Applicant)": "Brampton Energy Storage Limited", "Site Name": "West Melton Electricity Substation - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "26", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SW/O West Melton Electricity Substation Elsecar Road Brampton Bierlow", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S63 6EZ", "X-coordinate": "441204", "Y-coordinate": "400588", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/0853", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.500382", "long": "-1.380305", "status": "planning", "mw": 26, "ext_id": "11436"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 26, "mwh_is_estimate": true, "mwh": 26, "mwh_estimate": 26, "status": "planning", "status_class": "", "date_first_heard": "2022-09-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Melton Electricity Substation - Energy Storage System", "name_short": "West Melton Electricity Substation", "owner": "Brampton Energy Storage Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.500382", "long": "-1.380305", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.500382+-1.380305", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Teviot Wind Farm", "city": "", "id": "758", "external_id": "11442", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Muirhall Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "758", "external_id": "11442", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Teviot Wind Farm", "external_id": "11442", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Muirhall Energy Limited", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.342961", "long": "-2.939226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11442", "Record Last Updated (dd/mm/yyyy)": "10/06/2022", "Operator (or Applicant)": "Muirhall Energy Limited", "Site Name": "Teviot Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8921, 11441", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Teviot Wind Farm Land South, East And West Of Priesthaugh ", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD9", "X-coordinate": "340530", "Y-coordinate": "605838", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003249", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.342961", "long": "-2.939226", "status": "planning", "mw": 100, "ext_id": "11442"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Co-location REPD Ref ID", "from": "8921, 11441", "to": "8921 & 11441", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11442", "Record Last Updated (dd/mm/yyyy)": "10/06/2022", "Operator (or Applicant)": "Muirhall Energy Limited", "Site Name": "Teviot Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8921 & 11441", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Teviot Wind Farm Land South, East And West Of Priesthaugh ", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD9", "X-coordinate": "340530", "Y-coordinate": "605838", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003249", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.342961", "long": "-2.939226", "status": "planning", "mw": 100, "ext_id": "11442"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Teviot Wind Farm", "name_short": "Teviot Wind Farm", "owner": "Muirhall Energy Limited", "state": "scotland", "country": "uk", "lat": "55.342961", "long": "-2.939226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.342961+-2.939226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "city": "", "id": "759", "external_id": "11449", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harrington Franklin Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "759", "external_id": "11449", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "external_id": "11449", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harrington Franklin Limited", "status": "planning", "date_first_heard": "2022-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.306124", "long": "1.348574", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11449", "Record Last Updated (dd/mm/yyyy)": "14/06/2022", "Operator (or Applicant)": "Harrington Franklin Limited", "Site Name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Part Of Former Richborough Power Station Ramsgate Road ", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9DE", "X-coordinate": "633493", "Y-coordinate": "161659", "Planning Authority": "Dover District Council", "Planning Application Reference": "22/00705", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.306124", "long": "1.348574", "status": "planning", "mw": 49, "ext_id": "11449"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/06/2022", "to": "12/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/12/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "14/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11449", "Record Last Updated (dd/mm/yyyy)": "14/06/2022", "Operator (or Applicant)": "Harrington Franklin Limited", "Site Name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Part Of Former Richborough Power Station Ramsgate Road ", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9DE", "X-coordinate": "633493", "Y-coordinate": "161659", "Planning Authority": "Dover District Council", "Planning Application Reference": "22/00705", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.306124", "long": "1.348574", "status": "planning", "mw": 49, "ext_id": "11449"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "name_short": "Harrington Franklin, Richborough En...", "owner": "Harrington Franklin Limited", "state": "south east", "country": "uk", "lat": "51.306124", "long": "1.348574", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.306124+1.348574", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "city": "", "id": "760", "external_id": "11482", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Elgin Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "760", "external_id": "11482", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "external_id": "11482", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Elgin Energy", "status": "planning", "date_first_heard": "2022-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.165997", "long": "-3.150531", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11482", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Elgin Energy", "Site Name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "", "Storage Co-location REPD Ref ID": "6383", "Installed Capacity (MWelec)": "25", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land adj. to former Nant-Y-Gwy, Landfill site, Pentre, Mid Glamorgan", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1 4BD", "X-coordinate": "328650", "Y-coordinate": "697633", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002222", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "24/05/2022", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.165997", "long": "-3.150531", "status": "planning", "mw": 25, "ext_id": "11482"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Type", "from": "", "to": "Co-located with RE", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "24/05/2022", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Intervened", "from": "24/05/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "24/05/2027", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11482", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Elgin Energy", "Site Name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6383", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land adj. to former Nant-Y-Gwy, Landfill site, Pentre, Mid Glamorgan", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1 4BD", "X-coordinate": "328650", "Y-coordinate": "697633", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002222", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/05/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.165997", "long": "-3.150531", "status": "planning", "mw": 25, "ext_id": "11482"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "name_short": "Wemyss Estate - Randolph Solar Farm...", "owner": "Elgin Energy", "state": "scotland", "country": "uk", "lat": "56.165997", "long": "-3.150531", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.165997+-3.150531", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kingston Road, Slimbridge - Battery Storage", "city": "", "id": "763", "external_id": "11516", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Relay Slimbridge Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "763", "external_id": "11516", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kingston Road, Slimbridge - Battery Storage", "external_id": "11516", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 36, "power_mw": 36, "owner": "Relay Slimbridge Limited", "status": "planning", "date_first_heard": "2023-04-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.736447", "long": "-2.38398", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11516", "Record Last Updated (dd/mm/yyyy)": "22/06/2022", "Operator (or Applicant)": "Relay Slimbridge Limited", "Site Name": "Kingston Road, Slimbridge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North East Of Kingston Road Slimbridge ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7BN", "X-coordinate": "373581", "Y-coordinate": "204263", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.22/1157/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.736447", "long": "-2.38398", "status": "planning", "mw": 36, "ext_id": "11516"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "14882", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "26/04/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11516", "Record Last Updated (dd/mm/yyyy)": "22/06/2022", "Operator (or Applicant)": "Relay Slimbridge Limited", "Site Name": "Kingston Road, Slimbridge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14882", "Are they re-applying (Old REPD Ref) ": "", "Address": "North East Of Kingston Road Slimbridge ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7BN", "X-coordinate": "373581", "Y-coordinate": "204263", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.22/1157/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/04/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.736447", "long": "-2.38398", "status": "planning", "mw": 36, "ext_id": "11516"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 36, "mwh_is_estimate": true, "mwh": 36, "mwh_estimate": 36, "status": "planning", "status_class": "", "date_first_heard": "2023-04-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kingston Road, Slimbridge - Battery Storage", "name_short": "Kingston Road, Slimbridge", "owner": "Relay Slimbridge Limited", "state": "south west", "country": "uk", "lat": "51.736447", "long": "-2.38398", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.736447+-2.38398", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Llwyn Onn - Solar Farm & Battery Storage", "city": "", "id": "764", "external_id": "11544", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "764", "external_id": "11544", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Little Llwyn Onn - Solar Farm & Battery Storage", "external_id": "11544", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "Novus Renewable Services Limited", "status": "planning", "date_first_heard": "2023-03-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.034175", "long": "-2.954379", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11544", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Little Llwyn Onn - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11543", "Installed Capacity (MWelec)": "16", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Llwyn Onn, Cefn Road, Llwyn Onn", "County": "Clwyd", "Region": "Wales", "Country": "Wales", "Post Code": "LL13 0NY", "X-coordinate": "336098", "Y-coordinate": "348970", "Planning Authority": "Wrexham County Borough Council", "Planning Application Reference": "P/2022/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.034175", "long": "-2.954379", "status": "planning", "mw": 16, "ext_id": "11544"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/06/2022", "to": "14/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "08/03/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2023", "to": "24/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11544", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Little Llwyn Onn - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11543", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Llwyn Onn, Cefn Road, Llwyn Onn", "County": "Clwyd", "Region": "Wales", "Country": "Wales", "Post Code": "LL13 0NY", "X-coordinate": "336098", "Y-coordinate": "348970", "Planning Authority": "Wrexham County Borough Council", "Planning Application Reference": "P/2022/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/03/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.034175", "long": "-2.954379", "status": "planning", "mw": 16, "ext_id": "11544"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2023-03-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Little Llwyn Onn - Solar Farm & Battery Storage", "name_short": "Little Llwyn Onn - Solar Farm &", "owner": "Novus Renewable Services Limited", "state": "wales", "country": "uk", "lat": "53.034175", "long": "-2.954379", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.034175+-2.954379", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Third Drove, Fengate - Battery Storage", "city": "", "id": "765", "external_id": "11558", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Flag Fen Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "765", "external_id": "11558", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Third Drove, Fengate - Battery Storage", "external_id": "11558", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Flag Fen Power Limited", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.5702", "long": "-0.205405", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11558", "Record Last Updated (dd/mm/yyyy)": "28/06/2022", "Operator (or Applicant)": "Flag Fen Power Limited", "Site Name": "Third Drove, Fengate - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Third Drove Fengate ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE1 5QR", "X-coordinate": "521724", "Y-coordinate": "298443", "Planning Authority": "Peterborough City Council", "Planning Application Reference": "22/00740/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.5702", "long": "-0.205405", "status": "planning", "mw": 50, "ext_id": "11558"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/06/2022", "to": "16/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "05/01/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11558", "Record Last Updated (dd/mm/yyyy)": "16/01/2024", "Operator (or Applicant)": "Flag Fen Power Limited", "Site Name": "Third Drove, Fengate - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Third Drove Fengate ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE1 5QR", "X-coordinate": "521724", "Y-coordinate": "298443", "Planning Authority": "Peterborough City Council", "Planning Application Reference": "22/00740/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.5702", "long": "-0.205405", "status": "planning", "mw": 50, "ext_id": "11558"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Third Drove, Fengate - Battery Storage", "name_short": "Third Drove, Fengate", "owner": "Flag Fen Power Limited", "state": "eastern", "country": "uk", "lat": "52.5702", "long": "-0.205405", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.5702+-0.205405", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sutton Manor - Battery Storage Facility", "city": "", "id": "766", "external_id": "11559", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Sizing John Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "766", "external_id": "11559", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sutton Manor - Battery Storage Facility", "external_id": "11559", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Sizing John Limited", "status": "planning", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419678", "long": "-2.738489", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11559", "Record Last Updated (dd/mm/yyyy)": "28/06/2022", "Operator (or Applicant)": "Sizing John Limited", "Site Name": "Sutton Manor - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens ", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "WA9 4QH", "X-coordinate": "351018", "Y-coordinate": "391685", "Planning Authority": "St Helens Council", "Planning Application Reference": "P/2022/0392/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419678", "long": "-2.738489", "status": "planning", "mw": 57, "ext_id": "11559"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/06/2022", "to": "21/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "8439", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/10/2022", "to": "28/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11559", "Record Last Updated (dd/mm/yyyy)": "28/06/2022", "Operator (or Applicant)": "Sizing John Limited", "Site Name": "Sutton Manor - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8439", "Address": "S/O National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens ", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "WA9 4QH", "X-coordinate": "351018", "Y-coordinate": "391685", "Planning Authority": "St Helens Council", "Planning Application Reference": "P/2022/0392/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419678", "long": "-2.738489", "status": "planning", "mw": 57, "ext_id": "11559"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sutton Manor - Battery Storage Facility", "name_short": "Sutton Manor", "owner": "Sizing John Limited", "state": "north west", "country": "uk", "lat": "53.419678", "long": "-2.738489", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419678+-2.738489", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Craig Watch - Wind Farm & Battery Storage", "city": "", "id": "768", "external_id": "11609", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "27", "power_mw": "27", "customer": "", "owner": "Craig Watch Wind Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "768", "external_id": "11609", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Craig Watch - Wind Farm & Battery Storage", "external_id": "11609", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 27, "power_mw": 27, "owner": "Craig Watch Wind Farm Limited", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.445774", "long": "-3.129628", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11609", "Record Last Updated (dd/mm/yyyy)": "07/07/2022", "Operator (or Applicant)": "Craig Watch Wind Farm Limited", "Site Name": "Craig Watch - Wind Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11608", "Installed Capacity (MWelec)": "27.4", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Craig Watch Wind Farm Moray", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 4AA", "X-coordinate": "332299", "Y-coordinate": "840059", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00002177", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.445774", "long": "-3.129628", "status": "planning", "mw": 27, "ext_id": "11609"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11609", "Record Last Updated (dd/mm/yyyy)": "07/07/2022", "Operator (or Applicant)": "Craig Watch Wind Farm Limited", "Site Name": "Craig Watch - Wind Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11608", "Installed Capacity (MWelec)": "27.4", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Craig Watch Wind Farm Moray", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 4AA", "X-coordinate": "332299", "Y-coordinate": "840059", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00002177", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.445774", "long": "-3.129628", "status": "planning", "mw": 27, "ext_id": "11609"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 27, "mwh_is_estimate": true, "mwh": 27, "mwh_estimate": 27, "status": "planning", "status_class": "", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Craig Watch - Wind Farm & Battery Storage", "name_short": "Craig Watch - Wind Farm &", "owner": "Craig Watch Wind Farm Limited", "state": "scotland", "country": "uk", "lat": "57.445774", "long": "-3.129628", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.445774+-3.129628", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grassing Rome Street - Battery Storage", "city": "", "id": "769", "external_id": "11611", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "STOR 141 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "769", "external_id": "11611", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grassing Rome Street - Battery Storage", "external_id": "11611", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "STOR 141 Limited", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.886256", "long": "-2.933199", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11611", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "STOR 141 Limited", "Site Name": "Grassing Rome Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Railway Line and Bousteads Grassing, Rome Street, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA2 5AD", "X-coordinate": "340233", "Y-coordinate": "555011", "Planning Authority": "Carlisle City council", "Planning Application Reference": "22/0513", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.886256", "long": "-2.933199", "status": "planning", "mw": 15, "ext_id": "11611"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11611", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "STOR 141 Limited", "Site Name": "Grassing Rome Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Railway Line and Bousteads Grassing, Rome Street, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA2 5AD", "X-coordinate": "340233", "Y-coordinate": "555011", "Planning Authority": "Carlisle City council", "Planning Application Reference": "22/0513", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.886256", "long": "-2.933199", "status": "planning", "mw": 15, "ext_id": "11611"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grassing Rome Street - Battery Storage", "name_short": "Grassing Rome Street", "owner": "STOR 141 Limited", "state": "north west", "country": "uk", "lat": "54.886256", "long": "-2.933199", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.886256+-2.933199", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "city": "", "id": "770", "external_id": "11612", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "ADV 003 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "770", "external_id": "11612", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "external_id": "11612", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "ADV 003 Limited", "status": "planning", "date_first_heard": "2023-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.375577", "long": "-2.171149", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11612", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "ADV 003 Limited", "Site Name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN12 8LW", "X-coordinate": "388184", "Y-coordinate": "164072", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/03914", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.375577", "long": "-2.171149", "status": "planning", "mw": 150, "ext_id": "11612"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/07/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "23/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/01/2023", "to": "08/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11612", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "ADV 003 Limited", "Site Name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN12 8LW", "X-coordinate": "388184", "Y-coordinate": "164072", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/03914", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.375577", "long": "-2.171149", "status": "planning", "mw": 150, "ext_id": "11612"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "name_short": "Norrington Gate Farm, Broughton Gif...", "owner": "ADV 003 Limited", "state": "south west", "country": "uk", "lat": "51.375577", "long": "-2.171149", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.375577+-2.171149", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "city": "", "id": "771", "external_id": "11619", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Lightsource BP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "771", "external_id": "11619", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "external_id": "11619", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Lightsource BP", "status": "planning", "date_first_heard": "2023-07-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.835", "long": "-1.724221", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11619", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "Lightsource BP", "Site Name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11618", "Installed Capacity (MWelec)": "45", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of Edge Lane Maiden Law ", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH7 0RY", "X-coordinate": "417812", "Y-coordinate": "548943", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/01769/FPA ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.835", "long": "-1.724221", "status": "planning", "mw": 45, "ext_id": "11619"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/07/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11619", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "Lightsource BP", "Site Name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11618", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of Edge Lane Maiden Law ", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH7 0RY", "X-coordinate": "417812", "Y-coordinate": "548943", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/01769/FPA ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/07/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.835", "long": "-1.724221", "status": "planning", "mw": 45, "ext_id": "11619"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-07-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "name_short": "Edge Lane, Maiden Law - Solar Farm ...", "owner": "Lightsource BP", "state": "north east", "country": "uk", "lat": "54.835", "long": "-1.724221", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.835+-1.724221", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newhouse Farm - Energy Storage Facility", "city": "", "id": "801", "external_id": "9047", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "801", "external_id": "9047", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newhouse Farm - Energy Storage Facility", "external_id": "9047", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2023-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.402533", "long": "-3.49146", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9047", "Record Last Updated (dd/mm/yyyy)": "29/07/2022", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Newhouse Farm - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "170 Metres S/O Newhouse Farm, Perth", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH1 1QF", "X-coordinate": "308050", "Y-coordinate": "724363", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/01071/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.402533", "long": "-3.49146", "status": "planning", "mw": 49, "ext_id": "9047"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/07/2022", "to": "08/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "27/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/02/2023", "to": "29/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9047", "Record Last Updated (dd/mm/yyyy)": "29/07/2022", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Newhouse Farm - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "170 Metres S/O Newhouse Farm, Perth", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH1 1QF", "X-coordinate": "308050", "Y-coordinate": "724363", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/01071/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.402533", "long": "-3.49146", "status": "planning", "mw": 49, "ext_id": "9047"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newhouse Farm - Energy Storage Facility", "name_short": "Newhouse Farm - Energy", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "56.402533", "long": "-3.49146", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.402533+-3.49146", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fiddlers Ferry Power Station - Battery storage", "city": "", "id": "802", "external_id": "9404", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "SSE Enterprise (SSE PLC)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "802", "external_id": "9404", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fiddlers Ferry Power Station - Battery storage", "external_id": "9404", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "SSE Enterprise (SSE PLC)", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.373023", "long": "-2.68793", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9404", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "SSE Enterprise (SSE PLC)", "Site Name": "Fiddlers Ferry Power Station - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fiddlers Ferry Power Station, Widnes Road, Warrington", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA5 2UT", "X-coordinate": "354328", "Y-coordinate": "386461", "Planning Authority": "Warrington Borough Council", "Planning Application Reference": "2022/41800", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.373023", "long": "-2.68793", "status": "planning", "mw": 150, "ext_id": "9404"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/08/2022", "to": "06/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/06/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/07/2023", "to": "08/08/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9404", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "SSE Enterprise (SSE PLC)", "Site Name": "Fiddlers Ferry Power Station - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fiddlers Ferry Power Station, Widnes Road, Warrington", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA5 2UT", "X-coordinate": "354328", "Y-coordinate": "386461", "Planning Authority": "Warrington Borough Council", "Planning Application Reference": "2022/41800", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.373023", "long": "-2.68793", "status": "planning", "mw": 150, "ext_id": "9404"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fiddlers Ferry Power Station - Battery storage", "name_short": "Fiddlers Ferry Power Station", "owner": "SSE Enterprise (SSE PLC)", "state": "north west", "country": "uk", "lat": "53.373023", "long": "-2.68793", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.373023+-2.68793", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kilmarnock South Substation - Battery storage", "city": "", "id": "803", "external_id": "9696", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "803", "external_id": "9696", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kilmarnock South Substation - Battery storage", "external_id": "9696", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 300, "power_mw": 300, "owner": "Zenobe Energy", "status": "planning", "date_first_heard": "2023-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.578171", "long": "-4.46746", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9696", "Record Last Updated (dd/mm/yyyy)": "14/02/2022", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Kilmarnock South Substation - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kilmarnock South Substation Treeswoodhead Road ", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JP", "X-coordinate": "244549", "Y-coordinate": "634377", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003435", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.578171", "long": "-4.46746", "status": "planning", "mw": 300, "ext_id": "9696"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/02/2022", "to": "27/09/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "01/04/2022", "to": "22/02/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "10/03/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9696", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Kilmarnock South Substation - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kilmarnock South Substation Treeswoodhead Road ", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JP", "X-coordinate": "244549", "Y-coordinate": "634377", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003435", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/03/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.578171", "long": "-4.46746", "status": "planning", "mw": 300, "ext_id": "9696"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 300, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kilmarnock South Substation - Battery storage", "name_short": "Kilmarnock South Substation", "owner": "Zenobe Energy", "state": "scotland", "country": "uk", "lat": "55.578171", "long": "-4.46746", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.578171+-4.46746", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Walpole, St Peter - Battery Energy Storage", "city": "", "id": "804", "external_id": "9762", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Roc Noir Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "804", "external_id": "9762", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "North Walpole, St Peter - Battery Energy Storage", "external_id": "9762", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Roc Noir Limited", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.71969", "long": "0.220937", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9762", "Record Last Updated (dd/mm/yyyy)": "18/08/2022", "Operator (or Applicant)": "Roc Noir Limited", "Site Name": "North Walpole, St Peter - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SE Down Track From Westmoor West Drove North Walpole St Peter Wisbech Norfolk", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HU", "X-coordinate": "550103", "Y-coordinate": "315873", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "21/01803/FM ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.71969", "long": "0.220937", "status": "planning", "mw": 100, "ext_id": "9762"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Planning Authority", "from": "King's Lynn and West Norfolk Borough Council", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/08/2022", "to": "07/10/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9762", "Record Last Updated (dd/mm/yyyy)": "07/10/2021", "Operator (or Applicant)": "Roc Noir Limited", "Site Name": "North Walpole, St Peter - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SE Down Track From Westmoor West Drove North Walpole St Peter Wisbech Norfolk", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HU", "X-coordinate": "550103", "Y-coordinate": "315873", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "21/01803/FM ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.71969", "long": "0.220937", "status": "planning", "mw": 100, "ext_id": "9762"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "North Walpole, St Peter - Battery Energy Storage", "name_short": "North Walpole, St Peter", "owner": "Roc Noir Limited", "state": "eastern", "country": "uk", "lat": "52.71969", "long": "0.220937", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.71969+0.220937", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ochiltree - Battery Sorage", "city": "", "id": "805", "external_id": "10162", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "805", "external_id": "10162", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ochiltree - Battery Sorage", "external_id": "10162", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Statkraft UK Limited", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.454634", "long": "-4.266842", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10162", "Record Last Updated (dd/mm/yyyy)": "06/10/2022", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Ochiltree - Battery Sorage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Substation A70 From B730 To U74 Bardarroch Ochiltree ", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256745", "Y-coordinate": "62020", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "21/0748/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/10/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.440496", "long": "-4.018763", "status": "planning", "mw": 19, "ext_id": "10162"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Y-coordinate", "from": "62020", "to": "620201", "extra": "", "change_type": "misc"}, {"name": "lat", "from": "50.440496", "to": "55.454634", "extra": "", "change_type": "misc"}, {"name": "long", "from": "-4.018763", "to": "-4.266842", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "05/10/2022", "to": "05/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "15312", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10162", "Record Last Updated (dd/mm/yyyy)": "06/10/2022", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Ochiltree - Battery Sorage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15312", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Substation A70 From B730 To U74 Bardarroch Ochiltree ", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256745", "Y-coordinate": "620201", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "21/0748/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454634", "long": "-4.266842", "status": "planning", "mw": 19, "ext_id": "10162"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ochiltree - Battery Sorage", "name_short": "Ochiltree - Battery Sorage", "owner": "Statkraft UK Limited", "state": "scotland", "country": "uk", "lat": "55.454634", "long": "-4.266842", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.454634+-4.266842", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bullen Lane - Battery Storage", "city": "", "id": "806", "external_id": "10311", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Cambridge Power Limited / Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "806", "external_id": "10311", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bullen Lane - Battery Storage", "external_id": "10311", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Cambridge Power Limited / Pivot Power", "status": "construction", "date_first_heard": "2022-07-07", "start_construction": "2023-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.077364", "long": "1.094549", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10311", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Cambridge Power Limited / Pivot Power", "Site Name": "Bullen Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Bullen Lane", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP8 4JD", "X-coordinate": "612154", "Y-coordinate": "246630", "Planning Authority": "Babergh and Mid Suffolk District Council", "Planning Application Reference": "DC/21/05468", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.077364", "long": "1.094549", "status": "planning", "mw": 100, "ext_id": "10311"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/07/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Babergh and Mid Suffolk District Council", "to": "Babergh & Mid Suffolk District Councils", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "05/12/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "10311", "Record Last Updated (dd/mm/yyyy)": "05/12/2023", "Operator (or Applicant)": "Cambridge Power Limited / Pivot Power", "Site Name": "Bullen Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Bullen Lane", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP8 4JD", "X-coordinate": "612154", "Y-coordinate": "246630", "Planning Authority": "Babergh & Mid Suffolk District Councils", "Planning Application Reference": "DC/21/05468", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/07/2025", "Under Construction": "01/07/2023", "Operational": "", "Heat Network Ref": "", "lat": "52.077364", "long": "1.094549", "status": "construction", "mw": 100, "ext_id": "10311"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-18", "start_construction": "2023-12-05", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07-07", "start_construction": "2023-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bullen Lane - Battery Storage", "name_short": "Bullen Lane", "owner": "Cambridge Power Limited / Pivot Power", "state": "eastern", "country": "uk", "lat": "52.077364", "long": "1.094549", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.077364+1.094549", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Uskmouth Power Station - Battery Storage", "city": "", "id": "807", "external_id": "10936", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "230", "power_mw": "230", "customer": "", "owner": "Simec Atlantic Energy Uskmouth Power Station", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "807", "external_id": "10936", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Uskmouth Power Station - Battery Storage", "external_id": "10936", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 230, "power_mw": 230, "owner": "Simec Atlantic Energy Uskmouth Power Station", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.548527", "long": "-2.949183", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10936", "Record Last Updated (dd/mm/yyyy)": "09/09/2022", "Operator (or Applicant)": "Simec Atlantic Energy Uskmouth Power Station", "Site Name": "Uskmouth Power Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "230", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Uskmouth Power Station West Nash Road Nash Newport ", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP18 2BZ", "X-coordinate": "334280", "Y-coordinate": "183720", "Planning Authority": "Newport City Council", "Planning Application Reference": "22/0823", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.548527", "long": "-2.949183", "status": "planning", "mw": 230, "ext_id": "10936"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/09/2022", "to": "20/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "07/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/12/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/12/2022", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10936", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Simec Atlantic Energy Uskmouth Power Station", "Site Name": "Uskmouth Power Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "230", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Uskmouth Power Station West Nash Road Nash Newport ", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP18 2BZ", "X-coordinate": "334280", "Y-coordinate": "183720", "Planning Authority": "Newport City Council", "Planning Application Reference": "22/0823", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/12/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.548527", "long": "-2.949183", "status": "planning", "mw": 230, "ext_id": "10936"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 230, "mwh_is_estimate": true, "mwh": 230, "mwh_estimate": 230, "status": "planning", "status_class": "", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Uskmouth Power Station - Battery Storage", "name_short": "Uskmouth Power Station", "owner": "Simec Atlantic Energy Uskmouth Power Station", "state": "wales", "country": "uk", "lat": "51.548527", "long": "-2.949183", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.548527+-2.949183", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Bendings - Battery Storage", "city": "", "id": "808", "external_id": "10985", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Fiddes Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "808", "external_id": "10985", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Bendings - Battery Storage", "external_id": "10985", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Fiddes Battery Limited", "status": "planning", "date_first_heard": "2023-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.924265", "long": "-2.30368", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10985", "Record Last Updated (dd/mm/yyyy)": "29/09/2022", "Operator (or Applicant)": "Fiddes Battery Limited", "Site Name": "West Bendings - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North West Of West Bendings", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB39 2XR", "X-coordinate": "381613", "Y-coordinate": "781481", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2007", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.924265", "long": "-2.30368", "status": "planning", "mw": 30, "ext_id": "10985"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/09/2022", "to": "04/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/07/2023", "to": "11/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10985", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Fiddes Battery Limited", "Site Name": "West Bendings - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North West Of West Bendings", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB39 2XR", "X-coordinate": "381613", "Y-coordinate": "781481", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2007", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.924265", "long": "-2.30368", "status": "planning", "mw": 30, "ext_id": "10985"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Bendings - Battery Storage", "name_short": "West Bendings", "owner": "Fiddes Battery Limited", "state": "scotland", "country": "uk", "lat": "56.924265", "long": "-2.30368", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.924265+-2.30368", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ash Lane, Little London - Battery Storage", "city": "", "id": "810", "external_id": "11090", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Bramley BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "810", "external_id": "11090", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ash Lane, Little London - Battery Storage", "external_id": "11090", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Bramley BESS Limited", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.339184", "long": "-1.08705", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11090", "Record Last Updated (dd/mm/yyyy)": "15/07/2022", "Operator (or Applicant)": "Bramley BESS Limited", "Site Name": "Ash Lane, Little London - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of Ash Park Business Centre Ash Lane Little London, Tadley", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG26 5FL", "X-coordinate": "463691", "Y-coordinate": "160406", "Planning Authority": "Basingstoke and Deane Council", "Planning Application Reference": "22/01797/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.339184", "long": "-1.08705", "status": "planning", "mw": 57, "ext_id": "11090"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/07/2022", "to": "16/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Basingstoke and Deane Council", "to": "Basingstoke & Deane Borough Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/02/2023", "to": "27/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11090", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Bramley BESS Limited", "Site Name": "Ash Lane, Little London - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of Ash Park Business Centre Ash Lane Little London, Tadley", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG26 5FL", "X-coordinate": "463691", "Y-coordinate": "160406", "Planning Authority": "Basingstoke & Deane Borough Council", "Planning Application Reference": "22/01797/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.339184", "long": "-1.08705", "status": "planning", "mw": 57, "ext_id": "11090"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ash Lane, Little London - Battery Storage", "name_short": "Ash Lane, Little London", "owner": "Bramley BESS Limited", "state": "south east", "country": "uk", "lat": "51.339184", "long": "-1.08705", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.339184+-1.08705", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Worset Lane - Battery Energy Storage System", "city": "", "id": "811", "external_id": "11406", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Clearstone Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "811", "external_id": "11406", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Worset Lane - Battery Energy Storage System", "external_id": "11406", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Clearstone Energy", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.685388", "long": "-1.212911", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11406", "Record Last Updated (dd/mm/yyyy)": "05/08/2022", "Operator (or Applicant)": "Clearstone Energy", "Site Name": "Worset Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Worset Lane, Hartlepool", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "TS26", "X-coordinate": "450841", "Y-coordinate": "532544", "Planning Authority": "Hartlepool Borough Council", "Planning Application Reference": "H/2022/0263", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.685388", "long": "-1.212911", "status": "planning", "mw": 200, "ext_id": "11406"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/08/2022", "to": "01/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2023", "to": "07/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11406", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "Clearstone Energy", "Site Name": "Worset Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Worset Lane, Hartlepool", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "TS26", "X-coordinate": "450841", "Y-coordinate": "532544", "Planning Authority": "Hartlepool Borough Council", "Planning Application Reference": "H/2022/0263", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.685388", "long": "-1.212911", "status": "planning", "mw": 200, "ext_id": "11406"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Worset Lane - Battery Energy Storage System", "name_short": "Worset Lane - Battery", "owner": "Clearstone Energy", "state": "north east", "country": "uk", "lat": "54.685388", "long": "-1.212911", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.685388+-1.212911", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "city": "", "id": "812", "external_id": "11414", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "812", "external_id": "11414", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "external_id": "11414", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Balance Power Projects Limited", "status": "planning", "date_first_heard": "2022-08-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.569579", "long": "-2.191966", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11414", "Record Last Updated (dd/mm/yyyy)": "25/08/2022", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Staffordshire Railway Walk, Castlecroft Road, Castlecroft, Wolverhampton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XX", "X-coordinate": "387086", "Y-coordinate": "296879", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "21/00440/FUL", "Appeal Reference": "APP/C3430/W/22/3292837", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "23/12/2021", "Appeal Lodged": "12/04/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "16/08/2022", "Planning Permission Granted": "16/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.569579", "long": "-2.191966", "status": "planning", "mw": 50, "ext_id": "11414"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11414", "Record Last Updated (dd/mm/yyyy)": "25/08/2022", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Staffordshire Railway Walk, Castlecroft Road, Castlecroft, Wolverhampton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XX", "X-coordinate": "387086", "Y-coordinate": "296879", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "21/00440/FUL", "Appeal Reference": "APP/C3430/W/22/3292837", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "23/12/2021", "Appeal Lodged": "12/04/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "16/08/2022", "Planning Permission Granted": "16/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.569579", "long": "-2.191966", "status": "planning", "mw": 50, "ext_id": "11414"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-08-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "name_short": "South Staffordshire Railway Walk, C...", "owner": "Balance Power Projects Limited", "state": "west midlands", "country": "uk", "lat": "52.569579", "long": "-2.191966", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.569579+-2.191966", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Neil Fox Way - Battery Storage", "city": "Wakefield", "id": "813", "external_id": "11519", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.67289", "long": "-1.46662", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://planning.wakefield.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=REJXN6QQFWN00", "link2": "", "link3": "", "link4": ""}, "internal_id": "813", "external_id": "11519", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Neil Fox Way - Battery Storage", "external_id": "11519", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.669961", "long": "-1.468833", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11519", "Record Last Updated (dd/mm/yyyy)": "26/09/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Neil Fox Way - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Wakefield B Substation And East Of Neil Fox Way ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": " WF1 5DB", "X-coordinate": "435191", "Y-coordinate": "419407", "Planning Authority": "Wakefield Council", "Planning Application Reference": "22/01460/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.669961", "long": "-1.468833", "status": "planning", "mw": 99, "ext_id": "11519"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/09/2022", "to": "22/09/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11519", "Record Last Updated (dd/mm/yyyy)": "22/09/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Neil Fox Way - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Wakefield B Substation And East Of Neil Fox Way ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": " WF1 5DB", "X-coordinate": "435191", "Y-coordinate": "419407", "Planning Authority": "Wakefield Council", "Planning Application Reference": "22/01460/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.669961", "long": "-1.468833", "status": "planning", "mw": 99, "ext_id": "11519"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Neil Fox Way - Battery Storage", "name_short": "Neil Fox Way", "owner": "Harmony Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.669961", "long": "-1.468833", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.669961+-1.468833", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://planning.wakefield.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=REJXN6QQFWN00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "city": "", "id": "814", "external_id": "11623", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "66", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "814", "external_id": "11623", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "external_id": "11623", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "EcoDev Group Limited", "status": "planning", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.532097", "long": "-3.297128", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11623", "Record Last Updated (dd/mm/yyyy)": "12/10/2022", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11622", "Installed Capacity (MWelec)": "66", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Mains Of Keithick Farm, Keithick, Blairgowrie", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9NF", "X-coordinate": "320315", "Y-coordinate": "738540", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004521", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.532097", "long": "-3.297128", "status": "planning", "mw": 66, "ext_id": "11623"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/10/2022", "to": "06/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/04/2023", "to": "13/07/2022", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "66", "to": "16", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 66, "to": 16, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11623", "Record Last Updated (dd/mm/yyyy)": "13/07/2022", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11622", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Mains Of Keithick Farm, Keithick, Blairgowrie", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9NF", "X-coordinate": "320315", "Y-coordinate": "738540", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004521", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.532097", "long": "-3.297128", "status": "planning", "mw": 16, "ext_id": "11623"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "name_short": "Mains Of Keithick Farm, Keithick - ...", "owner": "EcoDev Group Limited", "state": "scotland", "country": "uk", "lat": "56.532097", "long": "-3.297128", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.532097+-3.297128", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Knockkippen Wind, Solar & Battery Farm", "city": "", "id": "817", "external_id": "11676", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Falck Renewables / REG Windpower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "817", "external_id": "11676", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Knockkippen Wind, Solar & Battery Farm", "external_id": "11676", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "Falck Renewables / REG Windpower", "status": "planning", "date_first_heard": "2022-07-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.348007", "long": "-4.467301", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11676", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Falck Renewables / REG Windpower", "Site Name": "Knockkippen Wind, Solar & Battery Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10468", "Installed Capacity (MWelec)": "16", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Knockkippen Moss", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7JH", "X-coordinate": "243650", "Y-coordinate": "608770", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004523", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.348007", "long": "-4.467301", "status": "planning", "mw": 16, "ext_id": "11676"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11676", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Falck Renewables / REG Windpower", "Site Name": "Knockkippen Wind, Solar & Battery Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10468", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Knockkippen Moss", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7JH", "X-coordinate": "243650", "Y-coordinate": "608770", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004523", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.348007", "long": "-4.467301", "status": "planning", "mw": 16, "ext_id": "11676"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2022-07-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Knockkippen Wind, Solar & Battery Farm", "name_short": "Knockkippen Wind, Solar & Battery F...", "owner": "Falck Renewables / REG Windpower", "state": "scotland", "country": "uk", "lat": "55.348007", "long": "-4.467301", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.348007+-4.467301", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dragons Lane - Battery Storage Facility", "city": "", "id": "818", "external_id": "11701", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Hydrock", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "818", "external_id": "11701", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dragons Lane - Battery Storage Facility", "external_id": "11701", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Hydrock", "status": "planning", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.16224", "long": "-2.411803", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11701", "Record Last Updated (dd/mm/yyyy)": "20/07/2022", "Operator (or Applicant)": "Hydrock", "Site Name": "Dragons Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Dragon's Lane, Sandbach, Moston", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW11 3QH", "X-coordinate": "372564", "Y-coordinate": "362870", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "22/2219C", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.16224", "long": "-2.411803", "status": "planning", "mw": 12, "ext_id": "11701"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/07/2022", "to": "12/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/12/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "20/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11701", "Record Last Updated (dd/mm/yyyy)": "20/07/2022", "Operator (or Applicant)": "Hydrock", "Site Name": "Dragons Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Dragon's Lane, Sandbach, Moston", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW11 3QH", "X-coordinate": "372564", "Y-coordinate": "362870", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "22/2219C", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.16224", "long": "-2.411803", "status": "planning", "mw": 12, "ext_id": "11701"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dragons Lane - Battery Storage Facility", "name_short": "Dragons Lane", "owner": "Hydrock", "state": "north west", "country": "uk", "lat": "53.16224", "long": "-2.411803", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.16224+-2.411803", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clay Tye Farm Phase 1 - Storage Facility", "city": "Upminster", "id": "819", "external_id": "11720", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-07-18", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552891", "long": "0.293464", "coords_hint": "", "use_case": "", "notes": "Duplicate of 76", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "819", "external_id": "11720", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clay Tye Farm Phase 1 - Storage Facility", "external_id": "11720", "state": "london", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "construction", "date_first_heard": "2017-07-18", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.551771", "long": "0.294345", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11720", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Clay Tye Farm Phase 1 - Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Clay Tye Farm, Clay Tye Road, Upminster", "County": "London", "Region": "London", "Country": "England", "Post Code": "RM14 3PL", "X-coordinate": "559168", "Y-coordinate": "186148", "Planning Authority": "London Borough of Havering Council", "Planning Application Reference": "P0611.17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.551771", "long": "0.294345", "status": "construction", "mw": 49, "ext_id": "11720"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Planning Authority", "from": "London Borough of Havering Council", "to": "London Borough of Havering", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11720", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Clay Tye Farm Phase 1 - Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Clay Tye Farm, Clay Tye Road, Upminster", "County": "London", "Region": "London", "Country": "England", "Post Code": "RM14 3PL", "X-coordinate": "559168", "Y-coordinate": "186148", "Planning Authority": "London Borough of Havering", "Planning Application Reference": "P0611.17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.551771", "long": "0.294345", "status": "construction", "mw": 49, "ext_id": "11720"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-07-18", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clay Tye Farm Phase 1 - Storage Facility", "name_short": "Clay Tye Farm Phase 1", "owner": "Harmony Energy Storage", "state": "london", "country": "uk", "lat": "51.551771", "long": "0.294345", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.551771+0.294345", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 76"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clay Tye Farm Phase 2 - Storage Facility", "city": "Upminster", "id": "820", "external_id": "11721", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-09-10", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552891", "long": "0.293464", "coords_hint": "", "use_case": "", "notes": "Duplicate of 76", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "820", "external_id": "11721", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clay Tye Farm Phase 2 - Storage Facility", "external_id": "11721", "state": "london", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "construction", "date_first_heard": "2018-09-10", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.551771", "long": "0.294345", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11721", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Clay Tye Farm Phase 2 - Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Clay Tye Farm, Clay Tye Road, Upminster", "County": "London", "Region": "London", "Country": "England", "Post Code": "RM14 3PL", "X-coordinate": "559168", "Y-coordinate": "186148", "Planning Authority": "London Borough of Havering Council", "Planning Application Reference": "P0888.18", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/09/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.551771", "long": "0.294345", "status": "construction", "mw": 49, "ext_id": "11721"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Planning Authority", "from": "London Borough of Havering Council", "to": "London Borough of Havering", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11721", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Clay Tye Farm Phase 2 - Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Clay Tye Farm, Clay Tye Road, Upminster", "County": "London", "Region": "London", "Country": "England", "Post Code": "RM14 3PL", "X-coordinate": "559168", "Y-coordinate": "186148", "Planning Authority": "London Borough of Havering", "Planning Application Reference": "P0888.18", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/09/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.551771", "long": "0.294345", "status": "construction", "mw": 49, "ext_id": "11721"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-09-10", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clay Tye Farm Phase 2 - Storage Facility", "name_short": "Clay Tye Farm Phase 2", "owner": "Harmony Energy Storage", "state": "london", "country": "uk", "lat": "51.551771", "long": "0.294345", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.551771+0.294345", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 76"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Indian Queens Sub-Station - Battery Storage", "city": "", "id": "821", "external_id": "11725", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "Prime Energy Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "821", "external_id": "11725", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Indian Queens Sub-Station - Battery Storage", "external_id": "11725", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 47, "power_mw": 47, "owner": "Prime Energy Development Limited", "status": "planning", "date_first_heard": "2022-10-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.390894", "long": "-4.894992", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11725", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Prime Energy Development Limited", "Site Name": "Indian Queens Sub-Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South West Of Indian Queens Sub-station St Dennis ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194318", "Y-coordinate": "58564", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA22/05961", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.390894", "long": "-4.894992", "status": "planning", "mw": 47, "ext_id": "11725"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/07/2022", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "25/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11725", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Prime Energy Development Limited", "Site Name": "Indian Queens Sub-Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South West Of Indian Queens Sub-station St Dennis ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194318", "Y-coordinate": "58564", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA22/05961", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.390894", "long": "-4.894992", "status": "planning", "mw": 47, "ext_id": "11725"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 47, "mwh_is_estimate": true, "mwh": 47, "mwh_estimate": 47, "status": "planning", "status_class": "", "date_first_heard": "2022-10-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Indian Queens Sub-Station - Battery Storage", "name_short": "Indian Queens Sub-Station", "owner": "Prime Energy Development Limited", "state": "south west", "country": "uk", "lat": "50.390894", "long": "-4.894992", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.390894+-4.894992", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Catsbrain Farm - Battery Storage ", "city": "", "id": "822", "external_id": "11787", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Conrad Energy (Developments) II Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "822", "external_id": "11787", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Catsbrain Farm - Battery Storage ", "external_id": "11787", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Conrad Energy (Developments) II Limited", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.600842", "long": "-1.748759", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11787", "Record Last Updated (dd/mm/yyyy)": "04/08/2022", "Operator (or Applicant)": "Conrad Energy (Developments) II Limited", "Site Name": "Catsbrain Farm - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7988", "Address": "N/O Kingsdown Road & West Of Catsbrain Farm Swindon", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN3 4TD", "X-coordinate": "417498", "Y-coordinate": "189141", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/22/1051", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.600842", "long": "-1.748759", "status": "planning", "mw": 30, "ext_id": "11787"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11787", "Record Last Updated (dd/mm/yyyy)": "04/08/2022", "Operator (or Applicant)": "Conrad Energy (Developments) II Limited", "Site Name": "Catsbrain Farm - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7988", "Address": "N/O Kingsdown Road & West Of Catsbrain Farm Swindon", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN3 4TD", "X-coordinate": "417498", "Y-coordinate": "189141", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/22/1051", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.600842", "long": "-1.748759", "status": "planning", "mw": 30, "ext_id": "11787"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Catsbrain Farm - Battery Storage ", "name_short": "Catsbrain Farm - Battery Storage ", "owner": "Conrad Energy (Developments) II Limited", "state": "south west", "country": "uk", "lat": "51.600842", "long": "-1.748759", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.600842+-1.748759", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "city": "", "id": "823", "external_id": "11793", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "823", "external_id": "11793", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "external_id": "11793", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Anglo Renewables Limited", "status": "planning", "date_first_heard": "2022-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.533595", "long": "-2.449525", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11793", "Record Last Updated (dd/mm/yyyy)": "04/08/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Says Court Farm Badminton Road Coalpit Heath", "County": "South Gloucestershire ", "Region": "South West", "Country": "England", "Post Code": "BS36 2NY", "X-coordinate": "368916", "Y-coordinate": "181728", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P22/03920/F ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.533595", "long": "-2.449525", "status": "planning", "mw": 50, "ext_id": "11793"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/08/2022", "to": "14/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "02/11/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "02/11/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/11/2022", "to": "04/08/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11793", "Record Last Updated (dd/mm/yyyy)": "04/08/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Says Court Farm Badminton Road Coalpit Heath", "County": "South Gloucestershire ", "Region": "South West", "Country": "England", "Post Code": "BS36 2NY", "X-coordinate": "368916", "Y-coordinate": "181728", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P22/03920/F ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.533595", "long": "-2.449525", "status": "planning", "mw": 50, "ext_id": "11793"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "name_short": "Says Court Farm, Coalpit Heath", "owner": "Anglo Renewables Limited", "state": "south west", "country": "uk", "lat": "51.533595", "long": "-2.449525", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.533595+-2.449525", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fairholme, Minety - Battery Storage", "city": "", "id": "825", "external_id": "11810", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "825", "external_id": "11810", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fairholme, Minety - Battery Storage", "external_id": "11810", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.610387", "long": "-1.97829", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11810", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Fairholme, Minety - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10488", "Address": "Dog Trap Lane , Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9PW", "X-coordinate": "401600", "Y-coordinate": "190173", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/05412", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.610387", "long": "-1.97829", "status": "planning", "mw": 50, "ext_id": "11810"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11810", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Fairholme, Minety - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10488", "Address": "Dog Trap Lane , Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9PW", "X-coordinate": "401600", "Y-coordinate": "190173", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/05412", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.610387", "long": "-1.97829", "status": "planning", "mw": 50, "ext_id": "11810"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fairholme, Minety - Battery Storage", "name_short": "Fairholme, Minety", "owner": "Pelagic Energy", "state": "south west", "country": "uk", "lat": "51.610387", "long": "-1.97829", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.610387+-1.97829", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stonehill, Minety", "city": "", "id": "826", "external_id": "11812", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Penso Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "826", "external_id": "11812", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stonehill, Minety", "external_id": "11812", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Penso Power Limited", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.606289", "long": "-2.006175", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11812", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Penso Power Limited", "Site Name": "Stonehill, Minety", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stonehill, Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "399669", "Y-coordinate": "189717", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/05504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.606289", "long": "-2.006175", "status": "planning", "mw": 50, "ext_id": "11812"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11812", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Penso Power Limited", "Site Name": "Stonehill, Minety", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stonehill, Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "399669", "Y-coordinate": "189717", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/05504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.606289", "long": "-2.006175", "status": "planning", "mw": 50, "ext_id": "11812"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stonehill, Minety", "name_short": "Stonehill, Minety", "owner": "Penso Power Limited", "state": "south west", "country": "uk", "lat": "51.606289", "long": "-2.006175", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.606289+-2.006175", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sclenteuch Wind Farm ", "city": "", "id": "828", "external_id": "11987", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "828", "external_id": "11987", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sclenteuch Wind Farm ", "external_id": "11987", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "RES Limited", "status": "planning", "date_first_heard": "2022-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.335658", "long": "-4.513053", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11987", "Record Last Updated (dd/mm/yyyy)": "05/09/2022", "Operator (or Applicant)": "RES Limited", "Site Name": "Sclenteuch Wind Farm ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9930", "Installed Capacity (MWelec)": "45", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "4612", "Address": "Sclenteuch Wind Farm, Cumnock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7LN", "X-coordinate": "240700", "Y-coordinate": "607500", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003318", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.335658", "long": "-4.513053", "status": "planning", "mw": 45, "ext_id": "11987"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11987", "Record Last Updated (dd/mm/yyyy)": "05/09/2022", "Operator (or Applicant)": "RES Limited", "Site Name": "Sclenteuch Wind Farm ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9930", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "4612", "Address": "Sclenteuch Wind Farm, Cumnock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7LN", "X-coordinate": "240700", "Y-coordinate": "607500", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003318", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.335658", "long": "-4.513053", "status": "planning", "mw": 45, "ext_id": "11987"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2022-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sclenteuch Wind Farm ", "name_short": "Sclenteuch Wind Farm ", "owner": "RES Limited", "state": "scotland", "country": "uk", "lat": "55.335658", "long": "-4.513053", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.335658+-4.513053", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Braintree Road, Cressing - Battery Storage", "city": "", "id": "829", "external_id": "11995", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "829", "external_id": "11995", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Braintree Road, Cressing - Battery Storage", "external_id": "11995", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Pivot Power (EDF Renewables)", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.875638", "long": "0.573744", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11995", "Record Last Updated (dd/mm/yyyy)": "06/09/2022", "Operator (or Applicant)": "Pivot Power", "Site Name": "Braintree Road, Cressing - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7161", "Address": "Electricity Sub Station Site, Braintree Road, Cressing, Braintree", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM7 3NA", "X-coordinate": "577266", "Y-coordinate": "222805", "Planning Authority": "Braintree District Council", "Planning Application Reference": "22/02180/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.875638", "long": "0.573744", "status": "planning", "mw": 57, "ext_id": "11995"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/09/2022", "to": "11/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Pivot Power", "to": "Pivot Power (EDF Renewables)", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11995", "Record Last Updated (dd/mm/yyyy)": "11/09/2023", "Operator (or Applicant)": "Pivot Power (EDF Renewables)", "Site Name": "Braintree Road, Cressing - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7161", "Address": "Electricity Sub Station Site, Braintree Road, Cressing, Braintree", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM7 3NA", "X-coordinate": "577266", "Y-coordinate": "222805", "Planning Authority": "Braintree District Council", "Planning Application Reference": "22/02180/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.875638", "long": "0.573744", "status": "planning", "mw": 57, "ext_id": "11995"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Braintree Road, Cressing - Battery Storage", "name_short": "Braintree Road, Cressing", "owner": "Pivot Power (EDF Renewables)", "state": "eastern", "country": "uk", "lat": "51.875638", "long": "0.573744", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.875638+0.573744", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Househill House, Househill - Battery Storage", "city": "", "id": "830", "external_id": "12056", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "830", "external_id": "12056", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Househill House, Househill - Battery Storage", "external_id": "12056", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Energy Storage Limited", "status": "planning", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.575557", "long": "-3.861558", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12056", "Record Last Updated (dd/mm/yyyy)": "09/09/2022", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Househill House, Househill - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "300M SE Of Househill House Househill Nairn", "County": "Highlands", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5RX", "X-coordinate": "288770", "Y-coordinate": "855471", "Planning Authority": "Highlands Council", "Planning Application Reference": "22/03638/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.575557", "long": "-3.861558", "status": "planning", "mw": 49, "ext_id": "12056"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "County", "from": "Highlands", "to": "Highland", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/09/2022", "to": "10/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/02/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12056", "Record Last Updated (dd/mm/yyyy)": "10/03/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Househill House, Househill - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "300M SE Of Househill House Househill Nairn", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5RX", "X-coordinate": "288770", "Y-coordinate": "855471", "Planning Authority": "Highland Council", "Planning Application Reference": "22/03638/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.575557", "long": "-3.861558", "status": "planning", "mw": 49, "ext_id": "12056"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Househill House, Househill - Battery Storage", "name_short": "Househill House, Househill", "owner": "Whirlwind Energy Storage Limited", "state": "scotland", "country": "uk", "lat": "57.575557", "long": "-3.861558", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.575557+-3.861558", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sandy Knowe Wind Farm Extension", "city": "", "id": "831", "external_id": "12080", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Executive Resource Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "831", "external_id": "12080", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sandy Knowe Wind Farm Extension", "external_id": "12080", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 28, "power_mw": 28, "owner": "Executive Resource Group", "status": "planning", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.372765", "long": "-3.947719", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12080", "Record Last Updated (dd/mm/yyyy)": "16/09/2022", "Operator (or Applicant)": "Executive Resource Group", "Site Name": "Sandy Knowe Wind Farm Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12079", "Installed Capacity (MWelec)": "28.4", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sandy Knowe Wind Farm, Kirkconnell, Sanquhar", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG4 6JY", "X-coordinate": "276668", "Y-coordinate": "610480", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003274", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.372765", "long": "-3.947719", "status": "planning", "mw": 28, "ext_id": "12080"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12080", "Record Last Updated (dd/mm/yyyy)": "16/09/2022", "Operator (or Applicant)": "Executive Resource Group", "Site Name": "Sandy Knowe Wind Farm Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12079", "Installed Capacity (MWelec)": "28.4", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sandy Knowe Wind Farm, Kirkconnell, Sanquhar", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG4 6JY", "X-coordinate": "276668", "Y-coordinate": "610480", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003274", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.372765", "long": "-3.947719", "status": "planning", "mw": 28, "ext_id": "12080"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 28, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "planning", "status_class": "", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sandy Knowe Wind Farm Extension", "name_short": "Sandy Knowe Wind Farm Extension", "owner": "Executive Resource Group", "state": "scotland", "country": "uk", "lat": "55.372765", "long": "-3.947719", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.372765+-3.947719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "city": "", "id": "832", "external_id": "12125", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Infra Balance New Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "832", "external_id": "12125", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "external_id": "12125", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Infra Balance New Energy", "status": "planning", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.026063", "long": "-2.892336", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12125", "Record Last Updated (dd/mm/yyyy)": "20/09/2022", "Operator (or Applicant)": "Infra Balance New Energy", "Site Name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Middleton Clean Energy Plant, Middleton Road, Middleton, Morecambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3NT", "X-coordinate": "341641", "Y-coordinate": "459265", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "22/00839/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.026063", "long": "-2.892336", "status": "planning", "mw": 50, "ext_id": "12125"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/09/2022", "to": "23/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/05/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12125", "Record Last Updated (dd/mm/yyyy)": "23/06/2023", "Operator (or Applicant)": "Infra Balance New Energy", "Site Name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Middleton Clean Energy Plant, Middleton Road, Middleton, Morecambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3NT", "X-coordinate": "341641", "Y-coordinate": "459265", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "22/00839/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.026063", "long": "-2.892336", "status": "planning", "mw": 50, "ext_id": "12125"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "name_short": "Lancaster Power Extension, Middleto...", "owner": "Infra Balance New Energy", "state": "north west", "country": "uk", "lat": "54.026063", "long": "-2.892336", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.026063+-2.892336", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "city": "", "id": "833", "external_id": "12174", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "STOR 107 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "833", "external_id": "12174", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "external_id": "12174", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "STOR 107 Limited", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.014013", "long": "-3.161939", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12174", "Record Last Updated (dd/mm/yyyy)": "27/09/2022", "Operator (or Applicant)": "STOR 107 Limited", "Site Name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hele Manor Farm, Hele Road, Bradford on Tone", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA4 1AH", "X-coordinate": "318587", "Y-coordinate": "124491", "Planning Authority": "Somerset West & Taunton", "Planning Application Reference": "07/22/0013", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.014013", "long": "-3.161939", "status": "planning", "mw": 20, "ext_id": "12174"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2022", "to": "19/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "13/04/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/04/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12174", "Record Last Updated (dd/mm/yyyy)": "19/06/2023", "Operator (or Applicant)": "STOR 107 Limited", "Site Name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hele Manor Farm, Hele Road, Bradford on Tone", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA4 1AH", "X-coordinate": "318587", "Y-coordinate": "124491", "Planning Authority": "Somerset West & Taunton", "Planning Application Reference": "07/22/0013", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/04/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.014013", "long": "-3.161939", "status": "planning", "mw": 20, "ext_id": "12174"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "name_short": "Hele Manor Farm, Bradford On Tone -...", "owner": "STOR 107 Limited", "state": "south west", "country": "uk", "lat": "51.014013", "long": "-3.161939", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.014013+-3.161939", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Waterloo Farm, Furbarn Road - Battery Storage", "city": "", "id": "834", "external_id": "12187", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "834", "external_id": "12187", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Waterloo Farm, Furbarn Road - Battery Storage", "external_id": "12187", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Shaw-Energi Limited", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.617082", "long": "-2.222376", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12187", "Record Last Updated (dd/mm/yyyy)": "18/08/2023", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "Waterloo Farm, Furbarn Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14597", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Waterloo Farm, Carr Wood And Clay Lane Power Station Furbarn Road", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 5UT", "X-coordinate": "385387", "Y-coordinate": "413416", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "22/00946/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2022", "Planning Application Withdrawn": "03/12/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.617082", "long": "-2.222376", "status": "planning", "mw": 57, "ext_id": "12187"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12187", "Record Last Updated (dd/mm/yyyy)": "18/08/2023", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "Waterloo Farm, Furbarn Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14597", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Waterloo Farm, Carr Wood And Clay Lane Power Station Furbarn Road", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 5UT", "X-coordinate": "385387", "Y-coordinate": "413416", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "22/00946/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2022", "Planning Application Withdrawn": "03/12/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.617082", "long": "-2.222376", "status": "planning", "mw": 57, "ext_id": "12187"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Waterloo Farm, Furbarn Road - Battery Storage", "name_short": "Waterloo Farm, Furbarn Road", "owner": "Shaw-Energi Limited", "state": "north west", "country": "uk", "lat": "53.617082", "long": "-2.222376", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.617082+-2.222376", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Redcote Lane, Armley - Battery Storage Facility", "city": "", "id": "835", "external_id": "12224", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Leeds Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "835", "external_id": "12224", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Redcote Lane, Armley - Battery Storage Facility", "external_id": "12224", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Cambridge Power Limited", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.805956", "long": "-1.588989", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12224", "Record Last Updated (dd/mm/yyyy)": "05/10/2022", "Operator (or Applicant)": "Leeds Power Limited", "Site Name": "Redcote Lane, Armley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7111", "Address": "Storage Land Adjacent 4 Redcote Lane Burley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS4 2AL", "X-coordinate": "427165", "Y-coordinate": "434485", "Planning Authority": "Leeds City Council", "Planning Application Reference": "22/05849/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.805956", "long": "-1.588989", "status": "planning", "mw": 60, "ext_id": "12224"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/10/2022", "to": "26/05/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/05/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Operator (or Applicant)", "from": "Leeds Power Limited", "to": "Cambridge Power Limited", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12224", "Record Last Updated (dd/mm/yyyy)": "26/05/2023", "Operator (or Applicant)": "Cambridge Power Limited", "Site Name": "Redcote Lane, Armley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7111", "Address": "Storage Land Adjacent 4 Redcote Lane Burley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS4 2AL", "X-coordinate": "427165", "Y-coordinate": "434485", "Planning Authority": "Leeds City Council", "Planning Application Reference": "22/05849/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.805956", "long": "-1.588989", "status": "planning", "mw": 60, "ext_id": "12224"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Redcote Lane, Armley - Battery Storage Facility", "name_short": "Redcote Lane, Armley", "owner": "Cambridge Power Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.805956", "long": "-1.588989", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.805956+-1.588989", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Back Lane, Skerne - Solar Farm & Battery Storage", "city": "", "id": "837", "external_id": "12297", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "BayWa r.e. UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "837", "external_id": "12297", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Back Lane, Skerne - Solar Farm & Battery Storage", "external_id": "12297", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "BayWa r.e. UK Limited", "status": "planning", "date_first_heard": "2020-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.983342", "long": "-0.407987", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12297", "Record Last Updated (dd/mm/yyyy)": "13/10/2022", "Operator (or Applicant)": "BayWa r.e. UK Limited", "Site Name": "Back Lane, Skerne - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12296", "Installed Capacity (MWelec)": "30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Back Lane, Skerne, Driffield", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO25 9HP", "X-coordinate": "504494", "Y-coordinate": "455316", "Planning Authority": "East Riding Of Yorkshire Council", "Planning Application Reference": "20/01962/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.983342", "long": "-0.407987", "status": "planning", "mw": 30, "ext_id": "12297"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/10/2022", "to": "18/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12297", "Record Last Updated (dd/mm/yyyy)": "18/11/2022", "Operator (or Applicant)": "BayWa r.e. UK Limited", "Site Name": "Back Lane, Skerne - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12296", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Back Lane, Skerne, Driffield", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO25 9HP", "X-coordinate": "504494", "Y-coordinate": "455316", "Planning Authority": "East Riding Of Yorkshire Council", "Planning Application Reference": "20/01962/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.983342", "long": "-0.407987", "status": "planning", "mw": 30, "ext_id": "12297"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2020-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Back Lane, Skerne - Solar Farm & Battery Storage", "name_short": "Back Lane, Skerne - Solar Farm &", "owner": "BayWa r.e. UK Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.983342", "long": "-0.407987", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.983342+-0.407987", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Manor Farm Energy Storage", "city": "", "id": "868", "external_id": "6948", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Innova Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "868", "external_id": "6948", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Manor Farm Energy Storage", "external_id": "6948", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Innova Renewables Limited", "status": "planning", "date_first_heard": "2017-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.147505", "long": "0.19181", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6948", "Record Last Updated (dd/mm/yyyy)": "15/12/2022", "Operator (or Applicant)": "Innova Renewables Limited", "Site Name": "Manor Farm Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "1694", "Installed Capacity (MWelec)": "10", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Manor Farm, Wainfleet Road, Irby-in-the-Marsh, Skegness", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE24 5AY", "X-coordinate": "546683", "Y-coordinate": "363395", "Planning Authority": "East Lindsey District Council", "Planning Application Reference": "S/051/00772/17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.147505", "long": "0.19181", "status": "planning", "mw": 10, "ext_id": "6948"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/12/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/11/2020", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "15/12/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6948", "Record Last Updated (dd/mm/yyyy)": "15/12/2022", "Operator (or Applicant)": "Innova Renewables Limited", "Site Name": "Manor Farm Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "1694", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Manor Farm, Wainfleet Road, Irby-in-the-Marsh, Skegness", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE24 5AY", "X-coordinate": "546683", "Y-coordinate": "363395", "Planning Authority": "East Lindsey District Council", "Planning Application Reference": "S/051/00772/17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/11/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.147505", "long": "0.19181", "status": "planning", "mw": 10, "ext_id": "6948"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2017-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Manor Farm Energy Storage", "name_short": "Manor Farm", "owner": "Innova Renewables Limited", "state": "east midlands", "country": "uk", "lat": "53.147505", "long": "0.19181", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.147505+0.19181", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clash Gour", "city": "", "id": "869", "external_id": "7178", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Renewables/ Force 9 ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "869", "external_id": "7178", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clash Gour", "external_id": "7178", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "EDF Energy Renewables/ Force 9 ", "status": "planning", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.484976", "long": "-3.535323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7178", "Record Last Updated (dd/mm/yyyy)": "27/10/2022", "Operator (or Applicant)": "EDF Energy Renewables/ Force 9 ", "Site Name": "Clash Gour", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6372", "Installed Capacity (MWelec)": "50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " located to the southwest, north and east of Berry Burn ", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "308050", "Y-coordinate": "844900", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000738", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/10/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.484976", "long": "-3.535323", "status": "planning", "mw": 50, "ext_id": "7178"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/10/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/10/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7178", "Record Last Updated (dd/mm/yyyy)": "27/10/2022", "Operator (or Applicant)": "EDF Energy Renewables/ Force 9 ", "Site Name": "Clash Gour", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6372", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " located to the southwest, north and east of Berry Burn ", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "308050", "Y-coordinate": "844900", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000738", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/10/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.484976", "long": "-3.535323", "status": "planning", "mw": 50, "ext_id": "7178"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clash Gour", "name_short": "Clash Gour", "owner": "EDF Energy Renewables/ Force 9 ", "state": "scotland", "country": "uk", "lat": "57.484976", "long": "-3.535323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.484976+-3.535323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Welkin Mill", "city": "", "id": "871", "external_id": "7832", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "871", "external_id": "7832", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Welkin Mill", "external_id": "7832", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Noriker Power", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419099", "long": "-2.135741", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7832", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Noriker Power", "Site Name": "Welkin Mill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8055", "Are they re-applying (Old REPD Ref) ": "", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391076", "Y-coordinate": "391375", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/075050", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2019", "Planning Application Withdrawn": "28/05/2020", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419099", "long": "-2.135741", "status": "planning", "mw": 49, "ext_id": "7832"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/01/2023", "to": "12/08/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7832", "Record Last Updated (dd/mm/yyyy)": "12/08/2020", "Operator (or Applicant)": "Noriker Power", "Site Name": "Welkin Mill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8055", "Are they re-applying (Old REPD Ref) ": "", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391076", "Y-coordinate": "391375", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/075050", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2019", "Planning Application Withdrawn": "28/05/2020", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419099", "long": "-2.135741", "status": "planning", "mw": 49, "ext_id": "7832"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Welkin Mill", "name_short": "Welkin Mill", "owner": "Noriker Power", "state": "north west", "country": "uk", "lat": "53.419099", "long": "-2.135741", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419099+-2.135741", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wissett Solar Farm, Wissett - Battery Storage", "city": "", "id": "872", "external_id": "9913", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "872", "external_id": "9913", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wissett Solar Farm, Wissett - Battery Storage", "external_id": "9913", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Pathfinder Clean Energy UK Dev Limited", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.353137", "long": "1.485016", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9913", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Wissett Solar Farm, Wissett - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9912", "Installed Capacity (MWelec)": "10", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "UKZ139 BC Wissett Solar Farm, Grays Lane, Wissett ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 0RA", "X-coordinate": "637428", "Y-coordinate": "278503", "Planning Authority": "Waveney District Council", "Planning Application Reference": "DC/22/3313/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.353137", "long": "1.485016", "status": "planning", "mw": 10, "ext_id": "9913"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "11/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9913", "Record Last Updated (dd/mm/yyyy)": "11/11/2021", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Wissett Solar Farm, Wissett - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9912", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "UKZ139 BC Wissett Solar Farm, Grays Lane, Wissett ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 0RA", "X-coordinate": "637428", "Y-coordinate": "278503", "Planning Authority": "Waveney District Council", "Planning Application Reference": "DC/22/3313/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.353137", "long": "1.485016", "status": "planning", "mw": 10, "ext_id": "9913"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wissett Solar Farm, Wissett - Battery Storage", "name_short": "Wissett Solar Farm, Wissett", "owner": "Pathfinder Clean Energy UK Dev Limited", "state": "eastern", "country": "uk", "lat": "52.353137", "long": "1.485016", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.353137+1.485016", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitehill Energy Storage", "city": "", "id": "873", "external_id": "10466", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "873", "external_id": "10466", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitehill Energy Storage", "external_id": "10466", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2022-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.86363", "long": "-4.236884", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10466", "Record Last Updated (dd/mm/yyyy)": "11/11/2022", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Whitehill Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Whitehill Farm, Coatbridge Road", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G69 8DT", "X-coordinate": "260107", "Y-coordinate": "665646", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004632", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.86363", "long": "-4.236884", "status": "planning", "mw": 200, "ext_id": "10466"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2022", "to": "27/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10466", "Record Last Updated (dd/mm/yyyy)": "27/01/2022", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Whitehill Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Whitehill Farm, Coatbridge Road", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G69 8DT", "X-coordinate": "260107", "Y-coordinate": "665646", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004632", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.86363", "long": "-4.236884", "status": "planning", "mw": 200, "ext_id": "10466"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whitehill Energy Storage", "name_short": "Whitehill", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "55.86363", "long": "-4.236884", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.86363+-4.236884", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newmarket Road, Bottisham - Battery Energy Storage", "city": "", "id": "874", "external_id": "10486", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "874", "external_id": "10486", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newmarket Road, Bottisham - Battery Energy Storage", "external_id": "10486", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Ridge Clean Energy Limited", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.21614", "long": "0.282934", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10486", "Record Last Updated (dd/mm/yyyy)": "01/12/2022", "Operator (or Applicant)": "Ridge Clean Energy Limited", "Site Name": "Newmarket Road, Bottisham - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10485", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Six Oaks Renewable Energy Park Newmarket Road Bottisham ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 9BD", "X-coordinate": "556060", "Y-coordinate": "260003", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "22/01291/ESF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.21614", "long": "0.282934", "status": "planning", "mw": 50, "ext_id": "10486"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/12/2022", "to": "03/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10486", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Ridge Clean Energy Limited", "Site Name": "Newmarket Road, Bottisham - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10485", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Six Oaks Renewable Energy Park Newmarket Road Bottisham ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 9BD", "X-coordinate": "556060", "Y-coordinate": "260003", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "22/01291/ESF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.21614", "long": "0.282934", "status": "planning", "mw": 50, "ext_id": "10486"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newmarket Road, Bottisham - Battery Energy Storage", "name_short": "Newmarket Road, Bottisham", "owner": "Ridge Clean Energy Limited", "state": "eastern", "country": "uk", "lat": "52.21614", "long": "0.282934", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.21614+0.282934", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Shaftesbury Energy Park - Battery Storage System", "city": "", "id": "875", "external_id": "10626", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": " TagEnergy ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "875", "external_id": "10626", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Shaftesbury Energy Park - Battery Storage System", "external_id": "10626", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": " TagEnergy ", "status": "planning", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.013484", "long": "-2.212803", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10626", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": " TagEnergy ", "Site Name": "Shaftesbury Energy Park - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawkers Hill Farm Shaftesbury Road Motcombe", "County": "Dorset ", "Region": "South West", "Country": "England", "Post Code": "SP7 9NP", "X-coordinate": "385168", "Y-coordinate": "123811", "Planning Authority": "North Dorset District Council", "Planning Application Reference": "P/FUL/2022/06179", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.013484", "long": "-2.212803", "status": "planning", "mw": 100, "ext_id": "10626"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "31/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "29/03/2035", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/03/2023", "to": "16/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10626", "Record Last Updated (dd/mm/yyyy)": "16/02/2022", "Operator (or Applicant)": " TagEnergy ", "Site Name": "Shaftesbury Energy Park - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawkers Hill Farm Shaftesbury Road Motcombe", "County": "Dorset ", "Region": "South West", "Country": "England", "Post Code": "SP7 9NP", "X-coordinate": "385168", "Y-coordinate": "123811", "Planning Authority": "North Dorset District Council", "Planning Application Reference": "P/FUL/2022/06179", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/03/2035", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.013484", "long": "-2.212803", "status": "planning", "mw": 100, "ext_id": "10626"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Shaftesbury Energy Park - Battery Storage System", "name_short": "Shaftesbury Energy Park - Battery S...", "owner": " TagEnergy ", "state": "south west", "country": "uk", "lat": "51.013484", "long": "-2.212803", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.013484+-2.212803", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rothienorman - Battery Storage", "city": "", "id": "876", "external_id": "10638", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "876", "external_id": "10638", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rothienorman - Battery Storage", "external_id": "10638", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco Limited", "status": "planning", "date_first_heard": "2022-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.4146", "long": "-2.466323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10638", "Record Last Updated (dd/mm/yyyy)": "22/11/2022", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Rothienorman - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "1.5km To The North West Of Rothienorman ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8GL", "X-coordinate": "372086", "Y-coordinate": "836121", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/1218", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.4146", "long": "-2.466323", "status": "planning", "mw": 49, "ext_id": "10638"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/11/2022", "to": "16/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10638", "Record Last Updated (dd/mm/yyyy)": "16/02/2022", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Rothienorman - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "1.5km To The North West Of Rothienorman ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8GL", "X-coordinate": "372086", "Y-coordinate": "836121", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/1218", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.4146", "long": "-2.466323", "status": "planning", "mw": 49, "ext_id": "10638"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rothienorman - Battery Storage", "name_short": "Rothienorman", "owner": "Anesco Limited", "state": "scotland", "country": "uk", "lat": "57.4146", "long": "-2.466323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.4146+-2.466323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hopsrig Wind Farm", "city": "", "id": "877", "external_id": "11066", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Muirhall Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "877", "external_id": "11066", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hopsrig Wind Farm", "external_id": "11066", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 14, "power_mw": 14, "owner": "Muirhall Energy Limited", "status": "planning", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.185847", "long": "-3.126869", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11066", "Record Last Updated (dd/mm/yyyy)": "27/10/2022", "Operator (or Applicant)": "Muirhall Energy Limited", "Site Name": "Hopsrig Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11065", "Installed Capacity (MWelec)": "14.1", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6099", "Address": " west of the B709, approximately 7.5 km north-west of Langholm and 15 km north-east of Lockerbie", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG13", "X-coordinate": "328347", "Y-coordinate": "588531", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002160", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.185847", "long": "-3.126869", "status": "planning", "mw": 14, "ext_id": "11066"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/10/2022", "to": "26/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11066", "Record Last Updated (dd/mm/yyyy)": "26/04/2022", "Operator (or Applicant)": "Muirhall Energy Limited", "Site Name": "Hopsrig Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11065", "Installed Capacity (MWelec)": "14.1", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6099", "Address": " west of the B709, approximately 7.5 km north-west of Langholm and 15 km north-east of Lockerbie", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG13", "X-coordinate": "328347", "Y-coordinate": "588531", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002160", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.185847", "long": "-3.126869", "status": "planning", "mw": 14, "ext_id": "11066"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 14, "mwh_is_estimate": true, "mwh": 14, "mwh_estimate": 14, "status": "planning", "status_class": "", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hopsrig Wind Farm", "name_short": "Hopsrig Wind Farm", "owner": "Muirhall Energy Limited", "state": "scotland", "country": "uk", "lat": "55.185847", "long": "-3.126869", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.185847+-3.126869", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Swangate Project - Energy Storage System", "city": "", "id": "879", "external_id": "11437", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Econergy International Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "879", "external_id": "11437", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Swangate Project - Energy Storage System", "external_id": "11437", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Econergy International Limited", "status": "planning", "date_first_heard": "2017-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.501776", "long": "-1.38039", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11437", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Econergy International Limited", "Site Name": "Swangate Project - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj West Melton Electricity Substation, Elsecar Road, Brampton Bierlow", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S63 6AG", "X-coordinate": "441197", "Y-coordinate": "400743", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2017/1132", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.501776", "long": "-1.38039", "status": "planning", "mw": 50, "ext_id": "11437"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "22/09/2020", "to": "NA", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2022", "to": "09/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11437", "Record Last Updated (dd/mm/yyyy)": "09/06/2022", "Operator (or Applicant)": "Econergy International Limited", "Site Name": "Swangate Project - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj West Melton Electricity Substation, Elsecar Road, Brampton Bierlow", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S63 6AG", "X-coordinate": "441197", "Y-coordinate": "400743", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2017/1132", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.501776", "long": "-1.38039", "status": "planning", "mw": 50, "ext_id": "11437"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2017-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Swangate Project - Energy Storage System", "name_short": "Swangate Project", "owner": "Econergy International Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.501776", "long": "-1.38039", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.501776+-1.38039", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Overhill Farm, Rothienorman - Battery Energy Storage", "city": "", "id": "880", "external_id": "11590", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "880", "external_id": "11590", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Overhill Farm, Rothienorman - Battery Energy Storage", "external_id": "11590", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "One Planet Developments Limited", "status": "planning", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.403505", "long": "-2.521716", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11590", "Record Last Updated (dd/mm/yyyy)": "10/11/2022", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Overhill Farm, Rothienorman - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Overhill Farm Rothienorman Inverurie ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8YN", "X-coordinate": "368749", "Y-coordinate": "834910", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2252", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.403505", "long": "-2.521716", "status": "planning", "mw": 49, "ext_id": "11590"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/11/2022", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/03/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2023", "to": "05/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11590", "Record Last Updated (dd/mm/yyyy)": "05/07/2022", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Overhill Farm, Rothienorman - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Overhill Farm Rothienorman Inverurie ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8YN", "X-coordinate": "368749", "Y-coordinate": "834910", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2252", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.403505", "long": "-2.521716", "status": "planning", "mw": 49, "ext_id": "11590"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Overhill Farm, Rothienorman - Battery Energy Storage", "name_short": "Overhill Farm, Rothienorman", "owner": "One Planet Developments Limited", "state": "scotland", "country": "uk", "lat": "57.403505", "long": "-2.521716", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.403505+-2.521716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Beanit Farm, Balsall Common - Battery Storage", "city": "", "id": "881", "external_id": "11656", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "881", "external_id": "11656", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Little Beanit Farm, Balsall Common - Battery Storage", "external_id": "11656", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Penso Power", "status": "planning", "date_first_heard": "2023-08-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.386124", "long": "-1.625067", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11656", "Record Last Updated (dd/mm/yyyy)": "10/11/2022", "Operator (or Applicant)": "Penso Power", "Site Name": "Little Beanit Farm, Balsall Common - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Beanit Farm Waste Lane Balsall Common Solihull ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7GH", "X-coordinate": "425615", "Y-coordinate": "276521", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2022/02308/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386124", "long": "-1.625067", "status": "planning", "mw": 200, "ext_id": "11656"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/11/2022", "to": "15/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "31/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11656", "Record Last Updated (dd/mm/yyyy)": "15/07/2022", "Operator (or Applicant)": "Penso Power", "Site Name": "Little Beanit Farm, Balsall Common - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Beanit Farm Waste Lane Balsall Common Solihull ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7GH", "X-coordinate": "425615", "Y-coordinate": "276521", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2022/02308/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "31/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "31/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386124", "long": "-1.625067", "status": "planning", "mw": 200, "ext_id": "11656"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-08-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Little Beanit Farm, Balsall Common - Battery Storage", "name_short": "Little Beanit Farm, Balsall Common", "owner": "Penso Power", "state": "west midlands", "country": "uk", "lat": "52.386124", "long": "-1.625067", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.386124+-1.625067", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rectory Farm, Rectory Lane - Battery Storage", "city": "", "id": "882", "external_id": "11905", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "882", "external_id": "11905", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rectory Farm, Rectory Lane - Battery Storage", "external_id": "11905", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Balance Power Projects Limited", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.308764", "long": "-2.102391", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11905", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Private Developer", "Site Name": "Rectory Farm, Rectory Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rectory Farm Rectory Lane Upton Warren", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "B61 7EL", "X-coordinate": "393116", "Y-coordinate": "267855", "Planning Authority": "Wychavon Council", "Planning Application Reference": "W/22/02326/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.308764", "long": "-2.102391", "status": "planning", "mw": 50, "ext_id": "11905"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/11/2022", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/02/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Operator (or Applicant)", "from": "Private Developer", "to": "Balance Power Projects Limited", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "50", "to": "30", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 50, "to": 30, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11905", "Record Last Updated (dd/mm/yyyy)": "02/03/2023", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "Rectory Farm, Rectory Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rectory Farm Rectory Lane Upton Warren", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "B61 7EL", "X-coordinate": "393116", "Y-coordinate": "267855", "Planning Authority": "Wychavon Council", "Planning Application Reference": "W/22/02326/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.308764", "long": "-2.102391", "status": "planning", "mw": 30, "ext_id": "11905"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rectory Farm, Rectory Lane - Battery Storage", "name_short": "Rectory Farm, Rectory Lane", "owner": "Balance Power Projects Limited", "state": "west midlands", "country": "uk", "lat": "52.308764", "long": "-2.102391", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.308764+-2.102391", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hillside Farm, Lancaster Road - Battery Storage", "city": "", "id": "883", "external_id": "11948", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Hamilton March", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "883", "external_id": "11948", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hillside Farm, Lancaster Road - Battery Storage", "external_id": "11948", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Hamilton March\n", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.03864", "long": "-2.852232", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11948", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Hamilton March\n", "Site Name": "Hillside Farm, Lancaster Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12964", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hillside Farm Lancaster Road Heaton With Oxcliffe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3ET", "X-coordinate": "344285", "Y-coordinate": "460632", "Planning Authority": "Lancaster Council", "Planning Application Reference": "22/01035/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/08/2022", "Planning Application Withdrawn": "24/10/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.03864", "long": "-2.852232", "status": "planning", "mw": 100, "ext_id": "11948"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11948", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Hamilton March\n", "Site Name": "Hillside Farm, Lancaster Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12964", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hillside Farm Lancaster Road Heaton With Oxcliffe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3ET", "X-coordinate": "344285", "Y-coordinate": "460632", "Planning Authority": "Lancaster Council", "Planning Application Reference": "22/01035/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/08/2022", "Planning Application Withdrawn": "24/10/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.03864", "long": "-2.852232", "status": "planning", "mw": 100, "ext_id": "11948"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hillside Farm, Lancaster Road - Battery Storage", "name_short": "Hillside Farm, Lancaster Road", "owner": "Hamilton March\n", "state": "north west", "country": "uk", "lat": "54.03864", "long": "-2.852232", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.03864+-2.852232", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "city": "", "id": "884", "external_id": "12206", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "1000", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "884", "external_id": "12206", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "external_id": "12206", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 1000, "power_mw": 1000, "owner": "Alcemi Storage Development Limited", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.608914", "long": "-3.82084", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12206", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1000", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Broken Cross Open Cast Mine Tower Road Douglas Lanark ", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 9PB", "X-coordinate": "285396", "Y-coordinate": "636539", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004698", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.608914", "long": "-3.82084", "status": "planning", "mw": 1000, "ext_id": "12206"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12206", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1000", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Broken Cross Open Cast Mine Tower Road Douglas Lanark ", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 9PB", "X-coordinate": "285396", "Y-coordinate": "636539", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004698", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.608914", "long": "-3.82084", "status": "planning", "mw": 1000, "ext_id": "12206"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1000, "mwh_is_estimate": true, "mwh": 1000, "mwh_estimate": 1000, "status": "planning", "status_class": "", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "name_short": "Coalburn II Energy Storage Facility", "owner": "Alcemi Storage Development Limited", "state": "scotland", "country": "uk", "lat": "55.608914", "long": "-3.82084", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.608914+-3.82084", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "city": "", "id": "885", "external_id": "12303", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Flexion Energy UK Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "885", "external_id": "12303", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "external_id": "12303", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Flexion Energy UK Storage", "status": "planning", "date_first_heard": "2023-01-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.600393", "long": "-1.913937", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12303", "Record Last Updated (dd/mm/yyyy)": "17/10/2022", "Operator (or Applicant)": "Flexion Energy UK Storage", "Site Name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Greenbank Caravan And Trailers Hillhead Of Phingask", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QL", "X-coordinate": "405243", "Y-coordinate": "856712", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/1988", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.600393", "long": "-1.913937", "status": "planning", "mw": 50, "ext_id": "12303"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "09/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/01/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12303", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "Flexion Energy UK Storage", "Site Name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Greenbank Caravan And Trailers Hillhead Of Phingask", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QL", "X-coordinate": "405243", "Y-coordinate": "856712", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/1988", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.600393", "long": "-1.913937", "status": "planning", "mw": 50, "ext_id": "12303"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "name_short": "Greenbank Caravan & Trailers, Hillh...", "owner": "Flexion Energy UK Storage", "state": "scotland", "country": "uk", "lat": "57.600393", "long": "-1.913937", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.600393+-1.913937", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ryton End, Barston - Battery Storage", "city": "", "id": "886", "external_id": "12348", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Greenfield Energy Consultancy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "886", "external_id": "12348", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ryton End, Barston - Battery Storage", "external_id": "12348", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Greenfield Energy Consultancy Limited", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.404549", "long": "-1.685104", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12348", "Record Last Updated (dd/mm/yyyy)": "19/10/2022", "Operator (or Applicant)": "Greenfield Energy Consultancy Limited", "Site Name": "Ryton End, Barston - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ryton End Barston ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B92 0LA", "X-coordinate": "421520", "Y-coordinate": "278551", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2022/02068/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.404549", "long": "-1.685104", "status": "planning", "mw": 50, "ext_id": "12348"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12348", "Record Last Updated (dd/mm/yyyy)": "19/10/2022", "Operator (or Applicant)": "Greenfield Energy Consultancy Limited", "Site Name": "Ryton End, Barston - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ryton End Barston ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B92 0LA", "X-coordinate": "421520", "Y-coordinate": "278551", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2022/02068/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.404549", "long": "-1.685104", "status": "planning", "mw": 50, "ext_id": "12348"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ryton End, Barston - Battery Storage", "name_short": "Ryton End, Barston", "owner": "Greenfield Energy Consultancy Limited", "state": "west midlands", "country": "uk", "lat": "52.404549", "long": "-1.685104", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.404549+-1.685104", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Killoch Depot, Killoch Colliery - Battery Storage", "city": "", "id": "887", "external_id": "12349", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Brockwell Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "887", "external_id": "12349", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Killoch Depot, Killoch Colliery - Battery Storage", "external_id": "12349", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Brockwell Energy Limited", "status": "planning", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.454673", "long": "-4.393136", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12349", "Record Last Updated (dd/mm/yyyy)": "19/10/2022", "Operator (or Applicant)": "Brockwell Energy Limited", "Site Name": "Killoch Depot, Killoch Colliery - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Killoch Depot Killoch Colliery Off A70 West Of Ochiltree Ochiltree", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18 2RL", "X-coordinate": "248760", "Y-coordinate": "620473", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "22/0405/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454673", "long": "-4.393136", "status": "planning", "mw": 49, "ext_id": "12349"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/10/2022", "to": "17/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/03/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12349", "Record Last Updated (dd/mm/yyyy)": "17/04/2023", "Operator (or Applicant)": "Brockwell Energy Limited", "Site Name": "Killoch Depot, Killoch Colliery - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Killoch Depot Killoch Colliery Off A70 West Of Ochiltree Ochiltree", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18 2RL", "X-coordinate": "248760", "Y-coordinate": "620473", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "22/0405/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454673", "long": "-4.393136", "status": "planning", "mw": 49, "ext_id": "12349"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Killoch Depot, Killoch Colliery - Battery Storage", "name_short": "Killoch Depot, Killoch Colliery", "owner": "Brockwell Energy Limited", "state": "scotland", "country": "uk", "lat": "55.454673", "long": "-4.393136", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.454673+-4.393136", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sellindge Substation, Church Lane - Battery Storage", "city": "", "id": "888", "external_id": "12351", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivoted Power Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "888", "external_id": "12351", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sellindge Substation, Church Lane - Battery Storage", "external_id": "12351", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Pivoted Power Llp", "status": "planning", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.10563", "long": "0.974985", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12351", "Record Last Updated (dd/mm/yyyy)": "19/10/2022", "Operator (or Applicant)": "Pivoted Power Llp", "Site Name": "Sellindge Substation, Church Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of National Grid Converter Station, Church Lane, Aldington,", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "TN25 6AF", "X-coordinate": "608362", "Y-coordinate": "138246", "Planning Authority": "Ashford Council", "Planning Application Reference": "PA/2022/2544", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.10563", "long": "0.974985", "status": "planning", "mw": 57, "ext_id": "12351"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Ashford Council", "to": "Ashford Borough Council", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/10/2022", "to": "11/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "04/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12351", "Record Last Updated (dd/mm/yyyy)": "11/09/2023", "Operator (or Applicant)": "Pivoted Power Llp", "Site Name": "Sellindge Substation, Church Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of National Grid Converter Station, Church Lane, Aldington,", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "TN25 6AF", "X-coordinate": "608362", "Y-coordinate": "138246", "Planning Authority": "Ashford Borough Council", "Planning Application Reference": "PA/2022/2544", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.10563", "long": "0.974985", "status": "planning", "mw": 57, "ext_id": "12351"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sellindge Substation, Church Lane - Battery Storage", "name_short": "Sellindge Substation, Church Lane", "owner": "Pivoted Power Llp", "state": "south east", "country": "uk", "lat": "51.10563", "long": "0.974985", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.10563+0.974985", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sunny Oaks Renewable Energy Park", "city": "", "id": "890", "external_id": "12415", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Sunny Oaks Renewable Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "890", "external_id": "12415", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sunny Oaks Renewable Energy Park", "external_id": "12415", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 28, "power_mw": 28, "owner": "Sunny Oaks Renewable Energy Park Limited", "status": "planning", "date_first_heard": "2022-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.717104", "long": "-1.248203", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12415", "Record Last Updated (dd/mm/yyyy)": "24/10/2022", "Operator (or Applicant)": "Sunny Oaks Renewable Energy Park Limited", "Site Name": "Sunny Oaks Renewable Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12054", "Installed Capacity (MWelec)": "28.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Se/O Whiterails Road, W/O Briddlesford Road, Wootton, Ryde", "County": "Isle of Wight", "Region": "South East", "Country": "England", "Post Code": "PO33 4RL", "X-coordinate": "453171", "Y-coordinate": "91100", "Planning Authority": "Isle of Wight Council", "Planning Application Reference": "22/01585/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.717104", "long": "-1.248203", "status": "planning", "mw": 28, "ext_id": "12415"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12415", "Record Last Updated (dd/mm/yyyy)": "24/10/2022", "Operator (or Applicant)": "Sunny Oaks Renewable Energy Park Limited", "Site Name": "Sunny Oaks Renewable Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12054", "Installed Capacity (MWelec)": "28.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Se/O Whiterails Road, W/O Briddlesford Road, Wootton, Ryde", "County": "Isle of Wight", "Region": "South East", "Country": "England", "Post Code": "PO33 4RL", "X-coordinate": "453171", "Y-coordinate": "91100", "Planning Authority": "Isle of Wight Council", "Planning Application Reference": "22/01585/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.717104", "long": "-1.248203", "status": "planning", "mw": 28, "ext_id": "12415"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 28, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "planning", "status_class": "", "date_first_heard": "2022-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sunny Oaks Renewable Energy Park", "name_short": "Sunny Oaks Renewable Energy Park", "owner": "Sunny Oaks Renewable Energy Park Limited", "state": "south east", "country": "uk", "lat": "50.717104", "long": "-1.248203", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.717104+-1.248203", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "John Green Frog Power Compound, John North Road - Battery System", "city": "", "id": "891", "external_id": "12455", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "891", "external_id": "12455", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "John Green Frog Power Compound, John North Road - Battery System", "external_id": "12455", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Green Frog Power Limited", "status": "planning", "date_first_heard": "2023-01-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.625182", "long": "-3.898523", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12455", "Record Last Updated (dd/mm/yyyy)": "28/10/2022", "Operator (or Applicant)": "Green Frog Power Limited", "Site Name": "John Green Frog Power Compound, John North Road - Battery System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Tir John Green Frog Power Compound Tir, John North Road, Port Tennant ", "County": "West Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "SA1 8NS ", "X-coordinate": "268678", "Y-coordinate": "193526", "Planning Authority": "Swansea Council", "Planning Application Reference": "2022/2356/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.625182", "long": "-3.898523", "status": "planning", "mw": 20, "ext_id": "12455"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/10/2022", "to": "24/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/01/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12455", "Record Last Updated (dd/mm/yyyy)": "24/01/2023", "Operator (or Applicant)": "Green Frog Power Limited", "Site Name": "John Green Frog Power Compound, John North Road - Battery System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Tir John Green Frog Power Compound Tir, John North Road, Port Tennant ", "County": "West Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "SA1 8NS ", "X-coordinate": "268678", "Y-coordinate": "193526", "Planning Authority": "Swansea Council", "Planning Application Reference": "2022/2356/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/01/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.625182", "long": "-3.898523", "status": "planning", "mw": 20, "ext_id": "12455"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-01-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "John Green Frog Power Compound, John North Road - Battery System", "name_short": "John Green Frog Power Compound, Joh...", "owner": "Green Frog Power Limited", "state": "wales", "country": "uk", "lat": "51.625182", "long": "-3.898523", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.625182+-3.898523", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Electricity Substation, Westerton Road - Battery Storage", "city": "", "id": "892", "external_id": "12467", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Keith Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "892", "external_id": "12467", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Electricity Substation, Westerton Road - Battery Storage", "external_id": "12467", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Keith Renewables Limited", "status": "planning", "date_first_heard": "2023-03-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.540623", "long": "-2.939551", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12467", "Record Last Updated (dd/mm/yyyy)": "28/10/2022", "Operator (or Applicant)": "Keith Renewables Limited", "Site Name": "Electricity Substation, Westerton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Electricity Substation Westerton Road ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NR", "X-coordinate": "343853", "Y-coordinate": "850444", "Planning Authority": "Moray Council", "Planning Application Reference": "22/01488/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.540623", "long": "-2.939551", "status": "planning", "mw": 49, "ext_id": "12467"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/10/2022", "to": "20/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/03/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12467", "Record Last Updated (dd/mm/yyyy)": "20/03/2023", "Operator (or Applicant)": "Keith Renewables Limited", "Site Name": "Electricity Substation, Westerton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Electricity Substation Westerton Road ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NR", "X-coordinate": "343853", "Y-coordinate": "850444", "Planning Authority": "Moray Council", "Planning Application Reference": "22/01488/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/03/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.540623", "long": "-2.939551", "status": "planning", "mw": 49, "ext_id": "12467"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Electricity Substation, Westerton Road - Battery Storage", "name_short": "Electricity Substation, Westerton R...", "owner": "Keith Renewables Limited", "state": "scotland", "country": "uk", "lat": "57.540623", "long": "-2.939551", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.540623+-2.939551", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eggborough Power Station, Selby Road - Battery Storage", "city": "", "id": "893", "external_id": "12483", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Eggborough Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "893", "external_id": "12483", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Eggborough Power Station, Selby Road - Battery Storage", "external_id": "12483", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Eggborough Power Limited", "status": "planning", "date_first_heard": "2023-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.713432", "long": "-1.129813", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12483", "Record Last Updated (dd/mm/yyyy)": "31/10/2022", "Operator (or Applicant)": "Eggborough Power Limited", "Site Name": "Eggborough Power Station, Selby Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Eggborough Power Station Selby Road Eggborough", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0BS", "X-coordinate": "457530", "Y-coordinate": "424464", "Planning Authority": "Selby Council", "Planning Application Reference": "2022/1105/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.713432", "long": "-1.129813", "status": "planning", "mw": 500, "ext_id": "12483"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/10/2022", "to": "24/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/01/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12483", "Record Last Updated (dd/mm/yyyy)": "24/01/2023", "Operator (or Applicant)": "Eggborough Power Limited", "Site Name": "Eggborough Power Station, Selby Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Eggborough Power Station Selby Road Eggborough", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0BS", "X-coordinate": "457530", "Y-coordinate": "424464", "Planning Authority": "Selby Council", "Planning Application Reference": "2022/1105/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.713432", "long": "-1.129813", "status": "planning", "mw": 500, "ext_id": "12483"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Eggborough Power Station, Selby Road - Battery Storage", "name_short": "Eggborough Power Station, Selby Roa...", "owner": "Eggborough Power Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.713432", "long": "-1.129813", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.713432+-1.129813", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Capenhurst Lane, Capenhurst - Battery Storage", "city": "", "id": "894", "external_id": "12503", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "894", "external_id": "12503", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Capenhurst Lane, Capenhurst - Battery Storage", "external_id": "12503", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Aura Power BESS Limited", "status": "planning", "date_first_heard": "2023-12-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.257431", "long": "-2.937607", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12503", "Record Last Updated (dd/mm/yyyy)": "03/11/2022", "Operator (or Applicant)": "Aura Power BESS Limited", "Site Name": "Capenhurst Lane, Capenhurst - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South of Capenhurst Lane Capenhurst ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH66 2NT", "X-coordinate": "337548", "Y-coordinate": "373791", "Planning Authority": "Cheshire West & Chester Council", "Planning Application Reference": "22/03585/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.257431", "long": "-2.937607", "status": "planning", "mw": 100, "ext_id": "12503"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/11/2022", "to": "13/12/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "08/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12503", "Record Last Updated (dd/mm/yyyy)": "13/12/2023", "Operator (or Applicant)": "Aura Power BESS Limited", "Site Name": "Capenhurst Lane, Capenhurst - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South of Capenhurst Lane Capenhurst ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH66 2NT", "X-coordinate": "337548", "Y-coordinate": "373791", "Planning Authority": "Cheshire West & Chester Council", "Planning Application Reference": "22/03585/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.257431", "long": "-2.937607", "status": "planning", "mw": 100, "ext_id": "12503"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-12-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Capenhurst Lane, Capenhurst - Battery Storage", "name_short": "Capenhurst Lane, Capenhurst", "owner": "Aura Power BESS Limited", "state": "north west", "country": "uk", "lat": "53.257431", "long": "-2.937607", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.257431+-2.937607", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "city": "", "id": "895", "external_id": "12524", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Ecclesfield Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "895", "external_id": "12524", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "external_id": "12524", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Ecclesfield Power Limited", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.445358", "long": "-1.45098", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12524", "Record Last Updated (dd/mm/yyyy)": "03/11/2022", "Operator (or Applicant)": "Ecclesfield Power Limited", "Site Name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Yarra Industrial Estate North Side Of Loicher Lane Ecclesfield", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S35 9XN", "X-coordinate": "436563", "Y-coordinate": "394428", "Planning Authority": "Sheffield Council", "Planning Application Reference": "22/03914/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.445358", "long": "-1.45098", "status": "planning", "mw": 20, "ext_id": "12524"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12524", "Record Last Updated (dd/mm/yyyy)": "03/11/2022", "Operator (or Applicant)": "Ecclesfield Power Limited", "Site Name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Yarra Industrial Estate North Side Of Loicher Lane Ecclesfield", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S35 9XN", "X-coordinate": "436563", "Y-coordinate": "394428", "Planning Authority": "Sheffield Council", "Planning Application Reference": "22/03914/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.445358", "long": "-1.45098", "status": "planning", "mw": 20, "ext_id": "12524"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "name_short": "Yarra Industrial Estate, Loicher La...", "owner": "Ecclesfield Power Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.445358", "long": "-1.45098", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.445358+-1.45098", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Norwich Road Industrial Estate", "city": "", "id": "896", "external_id": "12529", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Eelpower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-26", "start_construction": "2022-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "896", "external_id": "12529", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Norwich Road Industrial Estate", "external_id": "12529", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Eelpower Limited", "status": "construction", "date_first_heard": "2021-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.356262", "long": "1.508561", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12529", "Record Last Updated (dd/mm/yyyy)": "04/11/2022", "Operator (or Applicant)": "Eelpower Limited", "Site Name": "Norwich Road Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6958", "Address": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 8QJ", "X-coordinate": "639014", "Y-coordinate": "278928", "Planning Authority": "Suffolk Coastal District Council", "Planning Application Reference": "DC/21/0521/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/03/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/03/2024", "Under Construction": "01/04/2022", "Operational": "", "Heat Network Ref": "", "lat": "52.356262", "long": "1.508561", "status": "construction", "mw": 50, "ext_id": "12529"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "26/03/2024", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/04/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12529", "Record Last Updated (dd/mm/yyyy)": "04/11/2022", "Operator (or Applicant)": "Eelpower Limited", "Site Name": "Norwich Road Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6958", "Address": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 8QJ", "X-coordinate": "639014", "Y-coordinate": "278928", "Planning Authority": "Suffolk Coastal District Council", "Planning Application Reference": "DC/21/0521/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/03/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.356262", "long": "1.508561", "status": "construction", "mw": 50, "ext_id": "12529"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-03-26", "start_construction": "2022-04-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Norwich Road Industrial Estate", "name_short": "Norwich Road Industrial Estate", "owner": "Eelpower Limited", "state": "eastern", "country": "uk", "lat": "52.356262", "long": "1.508561", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.356262+1.508561", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "city": "", "id": "897", "external_id": "12571", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "897", "external_id": "12571", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "external_id": "12571", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Hydrock", "status": "planning", "date_first_heard": "2023-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.895059", "long": "-2.272987", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12571", "Record Last Updated (dd/mm/yyyy)": "07/11/2022", "Operator (or Applicant)": "Hydrock", "Site Name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Aspley House Farm Aspley Lane Slindon Stafford ", "County": "Staffordshire ", "Region": "West Midlands", "Country": "England", "Post Code": "ST21 6FB ", "X-coordinate": "381732", "Y-coordinate": "333103", "Planning Authority": "Stafford Borough Council", "Planning Application Reference": "22/36378/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.895059", "long": "-2.272987", "status": "planning", "mw": 10, "ext_id": "12571"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/11/2022", "to": "08/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "27/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/01/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12571", "Record Last Updated (dd/mm/yyyy)": "08/02/2023", "Operator (or Applicant)": "Hydrock", "Site Name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Aspley House Farm Aspley Lane Slindon Stafford ", "County": "Staffordshire ", "Region": "West Midlands", "Country": "England", "Post Code": "ST21 6FB ", "X-coordinate": "381732", "Y-coordinate": "333103", "Planning Authority": "Stafford Borough Council", "Planning Application Reference": "22/36378/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.895059", "long": "-2.272987", "status": "planning", "mw": 10, "ext_id": "12571"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "name_short": "Aspley House Farm, Aspley Lane", "owner": "Hydrock", "state": "west midlands", "country": "uk", "lat": "52.895059", "long": "-2.272987", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.895059+-2.272987", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "898", "external_id": "12649", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "898", "external_id": "12649", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Derehams Farm, Derehams Lane - Battery Storage", "external_id": "12649", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12649", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15544", "Are they re-applying (Old REPD Ref) ": "", "Address": "Derehams Farm Derehams Lane Loudwater ", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Wycombe Council", "Planning Application Reference": "22/07255/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "05/05/2023", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 50, "ext_id": "12649"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12649", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15544", "Are they re-applying (Old REPD Ref) ": "", "Address": "Derehams Farm Derehams Lane Loudwater ", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Wycombe Council", "Planning Application Reference": "22/07255/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "05/05/2023", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 50, "ext_id": "12649"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Derehams Farm, Derehams Lane - Battery Storage", "name_short": "Derehams Farm, Derehams Lane", "owner": "Newton Energi Limited", "state": "south east", "country": "uk", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.611399+-0.693977", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walpole Sub Station, Walpole Bank - Battery Storage", "city": "", "id": "899", "external_id": "12683", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Field Devco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "899", "external_id": "12683", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walpole Sub Station, Walpole Bank - Battery Storage", "external_id": "12683", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Field Devco Limited", "status": "planning", "date_first_heard": "2023-07-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.725225", "long": "0.209119", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12683", "Record Last Updated (dd/mm/yyyy)": "23/11/2022", "Operator (or Applicant)": "Field Devco Limited", "Site Name": "Walpole Sub Station, Walpole Bank - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opposite Walpole Sub Station Walpole Bank Walpole St Andrew ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549286", "Y-coordinate": "316464", "Planning Authority": "Kings Lynn and West Norfolk Council", "Planning Application Reference": "22/02021/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.725225", "long": "0.209119", "status": "planning", "mw": 100, "ext_id": "12683"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2022", "to": "12/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Kings Lynn and West Norfolk Council", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "04/07/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "04/07/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12683", "Record Last Updated (dd/mm/yyyy)": "12/07/2023", "Operator (or Applicant)": "Field Devco Limited", "Site Name": "Walpole Sub Station, Walpole Bank - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opposite Walpole Sub Station Walpole Bank Walpole St Andrew ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549286", "Y-coordinate": "316464", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02021/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/07/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.725225", "long": "0.209119", "status": "planning", "mw": 100, "ext_id": "12683"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-07-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walpole Sub Station, Walpole Bank - Battery Storage", "name_short": "Walpole Sub Station, Walpole Bank", "owner": "Field Devco Limited", "state": "eastern", "country": "uk", "lat": "52.725225", "long": "0.209119", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.725225+0.209119", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Misslebrook Farm, Botley Road - Battery Storage", "city": "", "id": "900", "external_id": "12691", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Boom Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "900", "external_id": "12691", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Misslebrook Farm, Botley Road - Battery Storage", "external_id": "12691", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Boom Developments Limited", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.976271", "long": "-1.434694", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12691", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Boom Developments Limited", "Site Name": "Misslebrook Farm, Botley Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Misslebrook Farm Botley Road North Baddesley", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO52 9EE", "X-coordinate": "439785", "Y-coordinate": "119803", "Planning Authority": "Test Valley Council", "Planning Application Reference": "22/03346/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.976271", "long": "-1.434694", "status": "planning", "mw": 60, "ext_id": "12691"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12691", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Boom Developments Limited", "Site Name": "Misslebrook Farm, Botley Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Misslebrook Farm Botley Road North Baddesley", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO52 9EE", "X-coordinate": "439785", "Y-coordinate": "119803", "Planning Authority": "Test Valley Council", "Planning Application Reference": "22/03346/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.976271", "long": "-1.434694", "status": "planning", "mw": 60, "ext_id": "12691"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Misslebrook Farm, Botley Road - Battery Storage", "name_short": "Misslebrook Farm, Botley Road", "owner": "Boom Developments Limited", "state": "south east", "country": "uk", "lat": "50.976271", "long": "-1.434694", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.976271+-1.434694", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Freshfields, Fairy Lane - Battery Storage", "city": "", "id": "901", "external_id": "12694", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "STOR Power Utilities Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "901", "external_id": "12694", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Freshfields, Fairy Lane - Battery Storage", "external_id": "12694", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "STOR Power Utilities Limited", "status": "planning", "date_first_heard": "2023-03-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419642", "long": "-2.282192", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12694", "Record Last Updated (dd/mm/yyyy)": "23/11/2022", "Operator (or Applicant)": "STOR Power Utilities Limited", "Site Name": "Freshfields, Fairy Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Freshfields Fairy Lane", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "M33 2JU", "X-coordinate": "381343", "Y-coordinate": "391464", "Planning Authority": "Trafford Council", "Planning Application Reference": "109463/FUL/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419642", "long": "-2.282192", "status": "planning", "mw": 99, "ext_id": "12694"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2022", "to": "12/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/03/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12694", "Record Last Updated (dd/mm/yyyy)": "12/04/2023", "Operator (or Applicant)": "STOR Power Utilities Limited", "Site Name": "Freshfields, Fairy Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Freshfields Fairy Lane", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "M33 2JU", "X-coordinate": "381343", "Y-coordinate": "391464", "Planning Authority": "Trafford Council", "Planning Application Reference": "109463/FUL/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419642", "long": "-2.282192", "status": "planning", "mw": 99, "ext_id": "12694"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-03-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Freshfields, Fairy Lane - Battery Storage", "name_short": "Freshfields, Fairy Lane", "owner": "STOR Power Utilities Limited", "state": "north west", "country": "uk", "lat": "53.419642", "long": "-2.282192", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419642+-2.282192", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Landulph, Ellbridge Lane - Battery Storage Facility", "city": "", "id": "902", "external_id": "12697", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivoted Power Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "902", "external_id": "12697", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Landulph, Ellbridge Lane - Battery Storage Facility", "external_id": "12697", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivoted Power Llp", "status": "planning", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.447258", "long": "-4.249736", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12697", "Record Last Updated (dd/mm/yyyy)": "23/11/2022", "Operator (or Applicant)": "Pivoted Power Llp", "Site Name": "Landulph, Ellbridge Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7051", "Address": "Adjacent To Landulph National Grid 400kV Substation Ellbridge Lane Ellbridge ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6PU", "X-coordinate": "240368", "Y-coordinate": "63243", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA22/10000", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447258", "long": "-4.249736", "status": "planning", "mw": 49, "ext_id": "12697"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2022", "to": "22/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/02/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12697", "Record Last Updated (dd/mm/yyyy)": "22/02/2023", "Operator (or Applicant)": "Pivoted Power Llp", "Site Name": "Landulph, Ellbridge Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7051", "Address": "Adjacent To Landulph National Grid 400kV Substation Ellbridge Lane Ellbridge ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6PU", "X-coordinate": "240368", "Y-coordinate": "63243", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA22/10000", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447258", "long": "-4.249736", "status": "planning", "mw": 49, "ext_id": "12697"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Landulph, Ellbridge Lane - Battery Storage Facility", "name_short": "Landulph, Ellbridge Lane", "owner": "Pivoted Power Llp", "state": "south west", "country": "uk", "lat": "50.447258", "long": "-4.249736", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.447258+-4.249736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Lincolnshire Green Energy Park", "city": "", "id": "904", "external_id": "12706", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Solar 21 Renewable Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "904", "external_id": "12706", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "North Lincolnshire Green Energy Park", "external_id": "12706", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Solar 21 Renewable Energy Limited", "status": "planning", "date_first_heard": "2022-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.619827", "long": "-0.701206", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12706", "Record Last Updated (dd/mm/yyyy)": "24/11/2022", "Operator (or Applicant)": "Solar 21 Renewable Energy Limited", "Site Name": "North Lincolnshire Green Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11621 & 12707", "Installed Capacity (MWelec)": "30", "CHP Enabled": "Yes", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7854", "Address": "Flixborough Wharf, Flixborough Industrial Estate, Scunthorpe", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN15 8SE", "X-coordinate": "486007", "Y-coordinate": "414482", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010116", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.619827", "long": "-0.701206", "status": "planning", "mw": 30, "ext_id": "12706"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/11/2022", "to": "11/01/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12706", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Solar 21 Renewable Energy Limited", "Site Name": "North Lincolnshire Green Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11621 & 12707", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "Yes", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7854", "Address": "Flixborough Wharf, Flixborough Industrial Estate, Scunthorpe", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN15 8SE", "X-coordinate": "486007", "Y-coordinate": "414482", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010116", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.619827", "long": "-0.701206", "status": "planning", "mw": 30, "ext_id": "12706"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "North Lincolnshire Green Energy Park", "name_short": "North Lincolnshire Green Energy Par...", "owner": "Solar 21 Renewable Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.619827", "long": "-0.701206", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.619827+-0.701206", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ourack", "city": "", "id": "906", "external_id": "12727", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vattenfall", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "906", "external_id": "12727", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ourack", "external_id": "12727", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Vattenfall", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.430257", "long": "-3.583832", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12727", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Vattenfall", "Site Name": "Ourack", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5949", "Installed Capacity (MWelec)": "50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "6km north of Granton-on-Spey", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "305000", "Y-coordinate": "838876", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001999", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.430257", "long": "-3.583832", "status": "planning", "mw": 50, "ext_id": "12727"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12727", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Vattenfall", "Site Name": "Ourack", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5949", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "No", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "6km north of Granton-on-Spey", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "305000", "Y-coordinate": "838876", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001999", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.430257", "long": "-3.583832", "status": "planning", "mw": 50, "ext_id": "12727"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ourack", "name_short": "Ourack", "owner": "Vattenfall", "state": "scotland", "country": "uk", "lat": "57.430257", "long": "-3.583832", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.430257+-3.583832", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newburn Bridge Road - Battery Storage Facility", "city": "", "id": "907", "external_id": "12729", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power Storage Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "907", "external_id": "12729", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newburn Bridge Road - Battery Storage Facility", "external_id": "12729", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "The Renewables Infrastructure Group Limited", "status": "planning", "date_first_heard": "2022-03-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.97525", "long": "-1.740618", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12729", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Aura Power Storage Solutions", "Site Name": "Newburn Bridge Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newburn Bridge Road, Btw Flogas & Blaydon Caravan, Blaydon on Tyne", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE21 4NT", "X-coordinate": "416701", "Y-coordinate": "564546", "Planning Authority": "Gateshead Council", "Planning Application Reference": "DC/21/00922/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "31/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "31/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.97525", "long": "-1.740618", "status": "planning", "mw": 100, "ext_id": "12729"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/11/2022", "to": "13/02/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Aura Power Storage Solutions", "to": "The Renewables Infrastructure Group Limited", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12729", "Record Last Updated (dd/mm/yyyy)": "13/02/2023", "Operator (or Applicant)": "The Renewables Infrastructure Group Limited", "Site Name": "Newburn Bridge Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newburn Bridge Road, Btw Flogas & Blaydon Caravan, Blaydon on Tyne", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE21 4NT", "X-coordinate": "416701", "Y-coordinate": "564546", "Planning Authority": "Gateshead Council", "Planning Application Reference": "DC/21/00922/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "31/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "31/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.97525", "long": "-1.740618", "status": "planning", "mw": 100, "ext_id": "12729"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-03-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newburn Bridge Road - Battery Storage Facility", "name_short": "Newburn Bridge Road", "owner": "The Renewables Infrastructure Group Limited", "state": "north east", "country": "uk", "lat": "54.97525", "long": "-1.740618", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.97525+-1.740618", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barlow Road, Barlow Road - Battery Storage", "city": "", "id": "908", "external_id": "12734", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "908", "external_id": "12734", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barlow Road, Barlow Road - Battery Storage", "external_id": "12734", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Vox Energy Limited", "status": "planning", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12734", "Record Last Updated (dd/mm/yyyy)": "06/09/2023", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14715", "Are they re-applying (Old REPD Ref) ": "9970", "Address": "Home Farm Barlow Road Barlow", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "2022/1257/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "08/03/2023", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 80, "ext_id": "12734"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12734", "Record Last Updated (dd/mm/yyyy)": "06/09/2023", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14715", "Are they re-applying (Old REPD Ref) ": "9970", "Address": "Home Farm Barlow Road Barlow", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "2022/1257/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "08/03/2023", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 80, "ext_id": "12734"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barlow Road, Barlow Road - Battery Storage", "name_short": "Barlow Road, Barlow Road", "owner": "Vox Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.773171+-1.057521", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "city": "", "id": "909", "external_id": "12780", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balnacraig Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "909", "external_id": "12780", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "external_id": "12780", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Balnacraig Battery Storage Limited", "status": "planning", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.706449", "long": "-4.279", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12780", "Record Last Updated (dd/mm/yyyy)": "05/12/2022", "Operator (or Applicant)": "Balnacraig Battery Storage Limited", "Site Name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Alness Grid Sub Station, Mid Balnacraig, Alness ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV17 0XL", "X-coordinate": "264300", "Y-coordinate": "870800", "Planning Authority": "Highland Council", "Planning Application Reference": "22/05167/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.706449", "long": "-4.279", "status": "planning", "mw": 50, "ext_id": "12780"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/12/2022", "to": "19/12/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12780", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Balnacraig Battery Storage Limited", "Site Name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Alness Grid Sub Station, Mid Balnacraig, Alness ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV17 0XL", "X-coordinate": "264300", "Y-coordinate": "870800", "Planning Authority": "Highland Council", "Planning Application Reference": "22/05167/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.706449", "long": "-4.279", "status": "planning", "mw": 50, "ext_id": "12780"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "name_short": "Alness Grid Sub Station, Mid Balnac...", "owner": "Balnacraig Battery Storage Limited", "state": "scotland", "country": "uk", "lat": "57.706449", "long": "-4.279", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.706449+-4.279", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "city": "", "id": "910", "external_id": "12789", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "85", "power_mw": "85", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "910", "external_id": "12789", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "external_id": "12789", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 85, "power_mw": 85, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-05-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.402586", "long": "-1.269129", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12789", "Record Last Updated (dd/mm/yyyy)": "05/12/2022", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "85", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Green Lane, Thurcroft, Rotherham", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S66 9JD", "X-coordinate": "448690", "Y-coordinate": "389778", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/1767", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.402586", "long": "-1.269129", "status": "planning", "mw": 85, "ext_id": "12789"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/12/2022", "to": "30/05/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "12/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "12/05/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12789", "Record Last Updated (dd/mm/yyyy)": "30/05/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "85", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Green Lane, Thurcroft, Rotherham", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S66 9JD", "X-coordinate": "448690", "Y-coordinate": "389778", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/1767", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.402586", "long": "-1.269129", "status": "planning", "mw": 85, "ext_id": "12789"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 85, "mwh_is_estimate": true, "mwh": 85, "mwh_estimate": 85, "status": "planning", "status_class": "", "date_first_heard": "2023-05-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "name_short": "Green Lane, Thurcroft - Battery Ene...", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.402586", "long": "-1.269129", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.402586+-1.269129", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "912", "external_id": "12803", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "912", "external_id": "12803", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Derehams Farm, Derehams Lane - Battery Storage", "external_id": "12803", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Capbal Limited", "status": "planning", "date_first_heard": "2023-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12803", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Capbal Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8142", "Address": "Derehams Farm, Derehams Lane, Loudwater, High Wycombe", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Buckinghamshire Council ", "Planning Application Reference": "22/08045/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 40, "ext_id": "12803"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "12/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Buckinghamshire Council ", "to": "Buckinghamshire Council - Wycombe Area", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "29/06/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12803", "Record Last Updated (dd/mm/yyyy)": "12/07/2023", "Operator (or Applicant)": "Capbal Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8142", "Address": "Derehams Farm, Derehams Lane, Loudwater, High Wycombe", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Buckinghamshire Council - Wycombe Area", "Planning Application Reference": "22/08045/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 40, "ext_id": "12803"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Derehams Farm, Derehams Lane - Battery Storage", "name_short": "Derehams Farm, Derehams Lane", "owner": "Capbal Limited", "state": "south east", "country": "uk", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.611399+-0.693977", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "city": "", "id": "914", "external_id": "12815", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Clinton Devon Estates", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "914", "external_id": "12815", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "external_id": "12815", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Clinton Devon Estates", "status": "planning", "date_first_heard": "2023-07-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.663611", "long": "-3.375369", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12815", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Clinton Devon Estates", "Site Name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackhill Quarry, Woodbury, Exeter", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX5 1HD", "X-coordinate": "302890", "Y-coordinate": "85785", "Planning Authority": "East Devon District Council\n", "Planning Application Reference": "22/2546/MFUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.663611", "long": "-3.375369", "status": "planning", "mw": 60, "ext_id": "12815"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "04/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/07/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12815", "Record Last Updated (dd/mm/yyyy)": "04/08/2023", "Operator (or Applicant)": "Clinton Devon Estates", "Site Name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackhill Quarry, Woodbury, Exeter", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX5 1HD", "X-coordinate": "302890", "Y-coordinate": "85785", "Planning Authority": "East Devon District Council\n", "Planning Application Reference": "22/2546/MFUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/07/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.663611", "long": "-3.375369", "status": "planning", "mw": 60, "ext_id": "12815"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-07-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "name_short": "Blackhill Quarry, Woodbury - Batter...", "owner": "Clinton Devon Estates", "state": "south west", "country": "uk", "lat": "50.663611", "long": "-3.375369", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.663611+-3.375369", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "city": "", "id": "915", "external_id": "12821", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ESB Asset Development UK Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "915", "external_id": "12821", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "external_id": "12821", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ESB Asset Development UK Ltd", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.370264", "long": "-2.582131", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12821", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "ESB Asset Development UK Ltd", "Site Name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10715", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SW/O Chesters, Harwick", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD9 8TW", "X-coordinate": "363203", "Y-coordinate": "608629", "Planning Authority": "Scottish Borders Council", "Planning Application Reference": "ECU00003426", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.370264", "long": "-2.582131", "status": "planning", "mw": 20, "ext_id": "12821"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12821", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "ESB Asset Development UK Ltd", "Site Name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10715", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SW/O Chesters, Harwick", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD9 8TW", "X-coordinate": "363203", "Y-coordinate": "608629", "Planning Authority": "Scottish Borders Council", "Planning Application Reference": "ECU00003426", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.370264", "long": "-2.582131", "status": "planning", "mw": 20, "ext_id": "12821"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "name_short": "Chesters - Millmoor Rig Wind Farm &", "owner": "ESB Asset Development UK Ltd", "state": "scotland", "country": "uk", "lat": "55.370264", "long": "-2.582131", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.370264+-2.582131", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "city": "", "id": "916", "external_id": "12823", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Elgin Energy Es Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "916", "external_id": "12823", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "external_id": "12823", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Elgin Energy Es Co Limited", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.559904", "long": "-1.842417", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12823", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Elgin Energy Es Co Limited", "Site Name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12822", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O A90 Peterhead to Fraserburgh Road, Se/O St Fergus Village, Peterhead", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB42 3HD", "X-coordinate": "409528", "Y-coordinate": "852212", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003226", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.559904", "long": "-1.842417", "status": "planning", "mw": 20, "ext_id": "12823"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "08/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12823", "Record Last Updated (dd/mm/yyyy)": "08/03/2023", "Operator (or Applicant)": "Elgin Energy Es Co Limited", "Site Name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12822", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O A90 Peterhead to Fraserburgh Road, Se/O St Fergus Village, Peterhead", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB42 3HD", "X-coordinate": "409528", "Y-coordinate": "852212", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003226", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.559904", "long": "-1.842417", "status": "planning", "mw": 20, "ext_id": "12823"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "name_short": "Fraserburgh Road - Kirkton Solar PV...", "owner": "Elgin Energy Es Co Limited", "state": "scotland", "country": "uk", "lat": "57.559904", "long": "-1.842417", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.559904+-1.842417", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bengrove Farm, Base Lane - Battery Storage", "city": "", "id": "917", "external_id": "12830", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Bengrove Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "917", "external_id": "12830", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bengrove Farm, Base Lane - Battery Storage", "external_id": "12830", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Bengrove Bess Limited", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.903075", "long": "-2.247495", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12830", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Bengrove Bess Limited", "Site Name": "Bengrove Farm, Base Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bengrove Farm, Base Lane, Sandhurst", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 9NU", "X-coordinate": "383069", "Y-coordinate": "222755", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "22/01231/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.903075", "long": "-2.247495", "status": "planning", "mw": 49, "ext_id": "12830"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12830", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Bengrove Bess Limited", "Site Name": "Bengrove Farm, Base Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bengrove Farm, Base Lane, Sandhurst", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 9NU", "X-coordinate": "383069", "Y-coordinate": "222755", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "22/01231/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.903075", "long": "-2.247495", "status": "planning", "mw": 49, "ext_id": "12830"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bengrove Farm, Base Lane - Battery Storage", "name_short": "Bengrove Farm, Base Lane", "owner": "Bengrove Bess Limited", "state": "south west", "country": "uk", "lat": "51.903075", "long": "-2.247495", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.903075+-2.247495", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkton Energy Farm", "city": "", "id": "918", "external_id": "12876", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Kirkton Wind Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "918", "external_id": "12876", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkton Energy Farm", "external_id": "12876", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Kirkton Wind Farm Limited", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.589", "long": "-3.556003", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12876", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "Kirkton Wind Farm Limited", "Site Name": "Kirkton Energy Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9705", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "1800M SW Of Kirkton Cemetery, Melvich", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14", "X-coordinate": "309643", "Y-coordinate": "967827", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003244", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.589", "long": "-3.556003", "status": "planning", "mw": 20, "ext_id": "12876"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12876", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "Kirkton Wind Farm Limited", "Site Name": "Kirkton Energy Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9705", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "1800M SW Of Kirkton Cemetery, Melvich", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14", "X-coordinate": "309643", "Y-coordinate": "967827", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003244", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.589", "long": "-3.556003", "status": "planning", "mw": 20, "ext_id": "12876"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkton Energy Farm", "name_short": "Kirkton Energy Farm", "owner": "Kirkton Wind Farm Limited", "state": "scotland", "country": "uk", "lat": "58.589", "long": "-3.556003", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.589+-3.556003", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tomchrasky Estate Wind farm", "city": "", "id": "919", "external_id": "12877", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "E Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "919", "external_id": "12877", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tomchrasky Estate Wind farm", "external_id": "12877", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "E Power Limited", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.173078", "long": "-4.829155", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12877", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "E Power Limited", "Site Name": "Tomchrasky Estate Wind farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8364", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "900m Ne/O Beinn An T-Sidhein Dalchreichart", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV3", "X-coordinate": "229056", "Y-coordinate": "812688", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004663", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.173078", "long": "-4.829155", "status": "planning", "mw": 50, "ext_id": "12877"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12877", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "E Power Limited", "Site Name": "Tomchrasky Estate Wind farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8364", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "900m Ne/O Beinn An T-Sidhein Dalchreichart", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV3", "X-coordinate": "229056", "Y-coordinate": "812688", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004663", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.173078", "long": "-4.829155", "status": "planning", "mw": 50, "ext_id": "12877"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tomchrasky Estate Wind farm", "name_short": "Tomchrasky Estate Wind farm", "owner": "E Power Limited", "state": "scotland", "country": "uk", "lat": "57.173078", "long": "-4.829155", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.173078+-4.829155", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "St Michaels Road, Ditton Road - Battery Storage", "city": "", "id": "920", "external_id": "12904", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Shell Green Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "920", "external_id": "12904", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "St Michaels Road, Ditton Road - Battery Storage", "external_id": "12904", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 14, "power_mw": 14, "owner": "Shell Green Limited", "status": "planning", "date_first_heard": "2023-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.358703", "long": "-2.762001", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12904", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "Shell Green Limited", "Site Name": "St Michaels Road, Ditton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Of St Michaels Road Ditton Road ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA8 0TH", "X-coordinate": "349383", "Y-coordinate": "384918", "Planning Authority": "Halton Council", "Planning Application Reference": "22/00623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.358703", "long": "-2.762001", "status": "planning", "mw": 14, "ext_id": "12904"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/12/2022", "to": "28/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12904", "Record Last Updated (dd/mm/yyyy)": "28/11/2023", "Operator (or Applicant)": "Shell Green Limited", "Site Name": "St Michaels Road, Ditton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Of St Michaels Road Ditton Road ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA8 0TH", "X-coordinate": "349383", "Y-coordinate": "384918", "Planning Authority": "Halton Council", "Planning Application Reference": "22/00623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.358703", "long": "-2.762001", "status": "planning", "mw": 14, "ext_id": "12904"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 14, "mwh_is_estimate": true, "mwh": 14, "mwh_estimate": 14, "status": "planning", "status_class": "", "date_first_heard": "2023-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "St Michaels Road, Ditton Road - Battery Storage", "name_short": "St Michaels Road, Ditton Road", "owner": "Shell Green Limited", "state": "north west", "country": "uk", "lat": "53.358703", "long": "-2.762001", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.358703+-2.762001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "city": "", "id": "921", "external_id": "12909", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "921", "external_id": "12909", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "external_id": "12909", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "24 Power Limited", "status": "planning", "date_first_heard": "2023-05-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.810686", "long": "-1.860826", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12909", "Record Last Updated (dd/mm/yyyy)": "20/12/2022", "Operator (or Applicant)": "24 Power Limited", "Site Name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Harrop Lane, Wilsden, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD15 0BZ", "X-coordinate": "409262", "Y-coordinate": "434942", "Planning Authority": "Bradford City of", "Planning Application Reference": "22/05010/MAF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.810686", "long": "-1.860826", "status": "planning", "mw": 100, "ext_id": "12909"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/12/2022", "to": "25/05/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Bradford City of", "to": "Bradford Metropolitan District Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/05/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12909", "Record Last Updated (dd/mm/yyyy)": "25/05/2023", "Operator (or Applicant)": "24 Power Limited", "Site Name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Harrop Lane, Wilsden, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD15 0BZ", "X-coordinate": "409262", "Y-coordinate": "434942", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "22/05010/MAF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.810686", "long": "-1.860826", "status": "planning", "mw": 100, "ext_id": "12909"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-05-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "name_short": "Bradford West, Harrop Lane, Wilsden", "owner": "24 Power Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.810686", "long": "-1.860826", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.810686+-1.860826", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "J3 Business Park - Battery Energy Storage Facility", "city": "", "id": "922", "external_id": "12920", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Forepower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "922", "external_id": "12920", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "J3 Business Park - Battery Energy Storage Facility", "external_id": "12920", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Forepower Limited", "status": "planning", "date_first_heard": "2023-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.50296", "long": "-1.127826", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12920", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Forepower Limited", "Site Name": "J3 Business Park - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6979", "Address": "J3 Business Park, Wright Business Park, Balby Carr Bank, Balby, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN4 8DE", "X-coordinate": "457948", "Y-coordinate": "401050", "Planning Authority": "Doncaster Metropolitan Borough Council", "Planning Application Reference": "22/02368/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.50296", "long": "-1.127826", "status": "planning", "mw": 10, "ext_id": "12920"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2022", "to": "27/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "24/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12920", "Record Last Updated (dd/mm/yyyy)": "27/01/2023", "Operator (or Applicant)": "Forepower Limited", "Site Name": "J3 Business Park - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6979", "Address": "J3 Business Park, Wright Business Park, Balby Carr Bank, Balby, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN4 8DE", "X-coordinate": "457948", "Y-coordinate": "401050", "Planning Authority": "Doncaster Metropolitan Borough Council", "Planning Application Reference": "22/02368/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.50296", "long": "-1.127826", "status": "planning", "mw": 10, "ext_id": "12920"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "J3 Business Park - Battery Energy Storage Facility", "name_short": "J3 Business Park - Battery Energy", "owner": "Forepower Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.50296", "long": "-1.127826", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.50296+-1.127826", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "923", "external_id": "12936", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coventry Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "923", "external_id": "12936", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "external_id": "12936", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Coventry Energy Storage Limited", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.386266", "long": "-1.610608", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12936", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Coventry Energy Storage Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Hodgetts Lane, Berkswell, Solihull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426599", "Y-coordinate": "276542", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2022/02581/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386266", "long": "-1.610608", "status": "planning", "mw": 49, "ext_id": "12936"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2022", "to": "13/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "15230", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12936", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Coventry Energy Storage Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15230", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Hodgetts Lane, Berkswell, Solihull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426599", "Y-coordinate": "276542", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2022/02581/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386266", "long": "-1.610608", "status": "planning", "mw": 49, "ext_id": "12936"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "name_short": "Hodgetts Lane, Berkswell - Electric...", "owner": "Coventry Energy Storage Limited", "state": "west midlands", "country": "uk", "lat": "52.386266", "long": "-1.610608", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.386266+-1.610608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "city": "", "id": "924", "external_id": "12941", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Low Carbon Solar Park 20 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "924", "external_id": "12941", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "external_id": "12941", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Low Carbon Solar Park 20 Limited", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.170471", "long": "0.351573", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12941", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Low Carbon Solar Park 20 Limited", "Site Name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12940", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Reeds Solar Farm Alders Road Colts Hill", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "TN12 6SR", "X-coordinate": "564495", "Y-coordinate": "143876", "Planning Authority": "Tunbridge Wells Council", "Planning Application Reference": "22/03563/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.170471", "long": "0.351573", "status": "planning", "mw": 20, "ext_id": "12941"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12941", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Low Carbon Solar Park 20 Limited", "Site Name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12940", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Reeds Solar Farm Alders Road Colts Hill", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "TN12 6SR", "X-coordinate": "564495", "Y-coordinate": "143876", "Planning Authority": "Tunbridge Wells Council", "Planning Application Reference": "22/03563/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.170471", "long": "0.351573", "status": "planning", "mw": 20, "ext_id": "12941"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "name_short": "Reeds Solar Farm, Alders Road - Sol...", "owner": "Low Carbon Solar Park 20 Limited", "state": "south east", "country": "uk", "lat": "51.170471", "long": "0.351573", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.170471+0.351573", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Long Pasture Farm, Little Stainton - Solar Farm", "city": "", "id": "925", "external_id": "12952", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Electric Works", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "925", "external_id": "12952", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Long Pasture Farm, Little Stainton - Solar Farm", "external_id": "12952", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Electric Works", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.57062", "long": "-1.471781", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12952", "Record Last Updated (dd/mm/yyyy)": "23/12/2022", "Operator (or Applicant)": "Electric Works", "Site Name": "Long Pasture Farm, Little Stainton - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12951", "Installed Capacity (MWelec)": "40", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The South Of Long Pasture Farm Little Stainton", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS21 1HW", "X-coordinate": "434248", "Y-coordinate": "519617", "Planning Authority": "Darlington Council", "Planning Application Reference": "22/01329/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.57062", "long": "-1.471781", "status": "planning", "mw": 40, "ext_id": "12952"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/12/2022", "to": "14/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "10/08/2030", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12952", "Record Last Updated (dd/mm/yyyy)": "14/08/2023", "Operator (or Applicant)": "Electric Works", "Site Name": "Long Pasture Farm, Little Stainton - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12951", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The South Of Long Pasture Farm Little Stainton", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS21 1HW", "X-coordinate": "434248", "Y-coordinate": "519617", "Planning Authority": "Darlington Council", "Planning Application Reference": "22/01329/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/08/2030", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.57062", "long": "-1.471781", "status": "planning", "mw": 40, "ext_id": "12952"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Long Pasture Farm, Little Stainton - Solar Farm", "name_short": "Long Pasture Farm, Little Stainton ...", "owner": "Electric Works", "state": "north east", "country": "uk", "lat": "54.57062", "long": "-1.471781", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.57062+-1.471781", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hillside Farm, Lancaster Road - Battery Storage", "city": "", "id": "927", "external_id": "12964", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Hamilton March", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "927", "external_id": "12964", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hillside Farm, Lancaster Road - Battery Storage", "external_id": "12964", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Hamilton March", "status": "planning", "date_first_heard": "2023-09-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.03864", "long": "-2.852232", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12964", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Hamilton March", "Site Name": "Hillside Farm, Lancaster Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "11948", "Address": "Hillside Farm Lancaster Road Heaton With Oxcliffe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": " LA3 3ET", "X-coordinate": "344285", "Y-coordinate": "460632", "Planning Authority": "Lancaster Council", "Planning Application Reference": "22/01317/FUL\ufffd", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.03864", "long": "-2.852232", "status": "planning", "mw": 100, "ext_id": "12964"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/01/2023", "to": "28/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "19/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12964", "Record Last Updated (dd/mm/yyyy)": "28/09/2023", "Operator (or Applicant)": "Hamilton March", "Site Name": "Hillside Farm, Lancaster Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "11948", "Address": "Hillside Farm Lancaster Road Heaton With Oxcliffe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": " LA3 3ET", "X-coordinate": "344285", "Y-coordinate": "460632", "Planning Authority": "Lancaster Council", "Planning Application Reference": "22/01317/FUL\ufffd", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.03864", "long": "-2.852232", "status": "planning", "mw": 100, "ext_id": "12964"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-09-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hillside Farm, Lancaster Road - Battery Storage", "name_short": "Hillside Farm, Lancaster Road", "owner": "Hamilton March", "state": "north west", "country": "uk", "lat": "54.03864", "long": "-2.852232", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.03864+-2.852232", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Welkin Mill, Welkin Road - Battery Storage", "city": "", "id": "928", "external_id": "12982", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "928", "external_id": "12982", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Welkin Mill, Welkin Road - Battery Storage", "external_id": "12982", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Noriker Power Limited", "status": "planning", "date_first_heard": "2023-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.417166", "long": "-2.136351", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12982", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Noriker Power Limited", "Site Name": "Welkin Mill, Welkin Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8055", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391035", "Y-coordinate": "391160", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/087394", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.417166", "long": "-2.136351", "status": "planning", "mw": 49, "ext_id": "12982"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/01/2023", "to": "23/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12982", "Record Last Updated (dd/mm/yyyy)": "23/08/2023", "Operator (or Applicant)": "Noriker Power Limited", "Site Name": "Welkin Mill, Welkin Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8055", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391035", "Y-coordinate": "391160", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/087394", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.417166", "long": "-2.136351", "status": "planning", "mw": 49, "ext_id": "12982"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Welkin Mill, Welkin Road - Battery Storage", "name_short": "Welkin Mill, Welkin Road", "owner": "Noriker Power Limited", "state": "north west", "country": "uk", "lat": "53.417166", "long": "-2.136351", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.417166+-2.136351", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scawd Law Wind Farm", "city": "", "id": "929", "external_id": "13000", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Fred Olsen Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "929", "external_id": "13000", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Scawd Law Wind Farm", "external_id": "13000", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Fred Olsen Renewables", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.650828", "long": "-3.013502", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13000", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Fred Olsen Renewables", "Site Name": "Scawd Law Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8002", "Installed Capacity (MWelec)": "12", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the north east of Innerleithen approximately 3 km to the east of the B709 and 4 km north of the A72", "County": "Scottish Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH43", "X-coordinate": "336319", "Y-coordinate": "640165", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002111", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.650828", "long": "-3.013502", "status": "planning", "mw": 12, "ext_id": "13000"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13000", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Fred Olsen Renewables", "Site Name": "Scawd Law Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8002", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the north east of Innerleithen approximately 3 km to the east of the B709 and 4 km north of the A72", "County": "Scottish Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH43", "X-coordinate": "336319", "Y-coordinate": "640165", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002111", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.650828", "long": "-3.013502", "status": "planning", "mw": 12, "ext_id": "13000"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Scawd Law Wind Farm", "name_short": "Scawd Law Wind Farm", "owner": "Fred Olsen Renewables", "state": "scotland", "country": "uk", "lat": "55.650828", "long": "-3.013502", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.650828+-3.013502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eccles Substation, Eccles - Battery Energy Storage System", "city": "", "id": "930", "external_id": "13003", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Eccles Grid Stability Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "930", "external_id": "13003", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Eccles Substation, Eccles - Battery Energy Storage System", "external_id": "13003", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Eccles Grid Stability Limited", "status": "planning", "date_first_heard": "2023-06-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.666218", "long": "-2.308354", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13003", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Eccles Grid Stability Limited", "Site Name": "Eccles Substation, Eccles - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, Eccles, Coldstream", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 4LU", "X-coordinate": "380701", "Y-coordinate": "641455", "Planning Authority": "Scottish Borders Council", "Planning Application Reference": "22/01988/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.666218", "long": "-2.308354", "status": "planning", "mw": 50, "ext_id": "13003"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2023", "to": "30/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/06/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13003", "Record Last Updated (dd/mm/yyyy)": "30/06/2023", "Operator (or Applicant)": "Eccles Grid Stability Limited", "Site Name": "Eccles Substation, Eccles - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, Eccles, Coldstream", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 4LU", "X-coordinate": "380701", "Y-coordinate": "641455", "Planning Authority": "Scottish Borders Council", "Planning Application Reference": "22/01988/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/06/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.666218", "long": "-2.308354", "status": "planning", "mw": 50, "ext_id": "13003"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-06-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Eccles Substation, Eccles - Battery Energy Storage System", "name_short": "Eccles Substation, Eccles - Battery", "owner": "Eccles Grid Stability Limited", "state": "scotland", "country": "uk", "lat": "55.666218", "long": "-2.308354", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.666218+-2.308354", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mount Pleasant Farm, Green Lane - Battery Storage", "city": "", "id": "931", "external_id": "13011", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Barton Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "931", "external_id": "13011", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mount Pleasant Farm, Green Lane - Battery Storage", "external_id": "13011", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Barton Battery Storage", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.852764", "long": "-2.724219", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13011", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Barton Battery Storage", "Site Name": "Mount Pleasant Farm, Green Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent Mount Pleasant Farm, Green Lane, Barton", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR3 0RP", "X-coordinate": "352457", "Y-coordinate": "439858", "Planning Authority": "Preston Council", "Planning Application Reference": " 06/2022/0763", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.852764", "long": "-2.724219", "status": "planning", "mw": 45, "ext_id": "13011"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2023", "to": "30/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13011", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Barton Battery Storage", "Site Name": "Mount Pleasant Farm, Green Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent Mount Pleasant Farm, Green Lane, Barton", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR3 0RP", "X-coordinate": "352457", "Y-coordinate": "439858", "Planning Authority": "Preston Council", "Planning Application Reference": " 06/2022/0763", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.852764", "long": "-2.724219", "status": "planning", "mw": 45, "ext_id": "13011"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mount Pleasant Farm, Green Lane - Battery Storage", "name_short": "Mount Pleasant Farm, Green Lane", "owner": "Barton Battery Storage", "state": "north west", "country": "uk", "lat": "53.852764", "long": "-2.724219", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.852764+-2.724219", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Garn Fach Wind Farm", "city": "", "id": "1076", "external_id": "7705", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1076", "external_id": "7705", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Garn Fach Wind Farm", "external_id": "7705", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "EDF Renewables", "status": "planning", "date_first_heard": "2023-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.413378", "long": "-3.39479", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7705", "Record Last Updated (dd/mm/yyyy)": "11/05/2023", "Operator (or Applicant)": "EDF Renewables", "Site Name": "Garn Fach Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7704", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land approximately 2km west of Llaithddu, 5km north-west of the village of Llanbadarn Fynydd and 8km to the south of Newtown, Powys, Wales", "County": "Powys", "Region": "Wales", "Country": "Wales", "Post Code": "LD1 6YR", "X-coordinate": "305228", "Y-coordinate": "280402", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3244499", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.413378", "long": "-3.39479", "status": "planning", "mw": 50, "ext_id": "7705"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/05/2023", "to": "26/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7705", "Record Last Updated (dd/mm/yyyy)": "26/05/2022", "Operator (or Applicant)": "EDF Renewables", "Site Name": "Garn Fach Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7704", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land approximately 2km west of Llaithddu, 5km north-west of the village of Llanbadarn Fynydd and 8km to the south of Newtown, Powys, Wales", "County": "Powys", "Region": "Wales", "Country": "Wales", "Post Code": "LD1 6YR", "X-coordinate": "305228", "Y-coordinate": "280402", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3244499", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.413378", "long": "-3.39479", "status": "planning", "mw": 50, "ext_id": "7705"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Garn Fach Wind Farm", "name_short": "Garn Fach Wind Farm", "owner": "EDF Renewables", "state": "wales", "country": "uk", "lat": "52.413378", "long": "-3.39479", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.413378+-3.39479", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Larks Green Solar Farm", "city": "", "id": "1077", "external_id": "8052", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Enso Energy / Iron Acton Green", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1077", "external_id": "8052", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Larks Green Solar Farm", "external_id": "8052", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Enso Energy / Iron Acton Green", "status": "planning", "date_first_heard": "2021-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.577938", "long": "-2.47741", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8052", "Record Last Updated (dd/mm/yyyy)": "06/06/2023", "Operator (or Applicant)": "Enso Energy / Iron Acton Green", "Site Name": "Larks Green Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8051", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North and West Of Iron Acto, Iron Acton, Bristol, Avon", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "367014", "Y-coordinate": "186672", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P20/13909/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.577938", "long": "-2.47741", "status": "planning", "mw": 49, "ext_id": "8052"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/06/2023", "to": "30/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8052", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Enso Energy / Iron Acton Green", "Site Name": "Larks Green Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8051", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North and West Of Iron Acto, Iron Acton, Bristol, Avon", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "367014", "Y-coordinate": "186672", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P20/13909/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.577938", "long": "-2.47741", "status": "planning", "mw": 49, "ext_id": "8052"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Larks Green Solar Farm", "name_short": "Larks Green Solar Farm", "owner": "Enso Energy / Iron Acton Green", "state": "south west", "country": "uk", "lat": "51.577938", "long": "-2.47741", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.577938+-2.47741", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Carrs - Energy storage facility", "city": "", "id": "1079", "external_id": "9207", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Meadow Farm Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1079", "external_id": "9207", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Carrs - Meadow Farm Energy storage facility", "external_id": "9207", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "BayWa r.e.", "status": "planning", "date_first_heard": "2023-09-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.587889", "long": "-1.381776", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9207", "Record Last Updated (dd/mm/yyyy)": "05/05/2023", "Operator (or Applicant)": "Meadow Farm Battery Limited", "Site Name": "The Carrs - Energy storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Se/O The Carrs, Fishing Lakes, Letch Lane, Carlton, Stockton on Tees", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS21 1ED", "X-coordinate": "440050", "Y-coordinate": "521586", "Planning Authority": "Stockton on Tees Borough Council ", "Planning Application Reference": "23/0752/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.587889", "long": "-1.381776", "status": "planning", "mw": 60, "ext_id": "9207"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/05/2023", "to": "26/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Meadow Farm Battery Limited", "to": "BayWa r.e.", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "The Carrs - Energy storage facility", "to": "The Carrs - Meadow Farm Energy storage facility", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "60", "to": "57", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/09/2026", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 60, "to": 57, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9207", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "BayWa r.e.", "Site Name": "The Carrs - Meadow Farm Energy storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Se/O The Carrs, Fishing Lakes, Letch Lane, Carlton, Stockton on Tees", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS21 1ED", "X-coordinate": "440050", "Y-coordinate": "521586", "Planning Authority": "Stockton on Tees Borough Council ", "Planning Application Reference": "23/0752/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.587889", "long": "-1.381776", "status": "planning", "mw": 57, "ext_id": "9207"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-09-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Carrs - Meadow Farm Energy storage facility", "name_short": "The Carrs - Meadow Farm Energy", "owner": "BayWa r.e.", "state": "north east", "country": "uk", "lat": "54.587889", "long": "-1.381776", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.587889+-1.381776", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Pargillis - Battery Storage", "city": "", "id": "1080", "external_id": "9564", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Renewable Connections Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1080", "external_id": "9564", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Pargillis - Battery Storage", "external_id": "9564", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 42, "power_mw": 42, "owner": "Renewable Connections Limited", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.049506", "long": "-3.381502", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9564", "Record Last Updated (dd/mm/yyyy)": "14/06/2023", "Operator (or Applicant)": "Renewable Connections Limited", "Site Name": "South Pargillis - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Growforth Limited, South Pargillis, Clockluine Road, Hillend, Dunfermline", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY11 7HS", "X-coordinate": "314048", "Y-coordinate": "684932", "Planning Authority": "Fife Council", "Planning Application Reference": "22/03945/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.049506", "long": "-3.381502", "status": "planning", "mw": 42, "ext_id": "9564"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/06/2023", "to": "09/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9564", "Record Last Updated (dd/mm/yyyy)": "09/09/2021", "Operator (or Applicant)": "Renewable Connections Limited", "Site Name": "South Pargillis - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Growforth Limited, South Pargillis, Clockluine Road, Hillend, Dunfermline", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY11 7HS", "X-coordinate": "314048", "Y-coordinate": "684932", "Planning Authority": "Fife Council", "Planning Application Reference": "22/03945/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.049506", "long": "-3.381502", "status": "planning", "mw": 42, "ext_id": "9564"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 42, "mwh_is_estimate": true, "mwh": 42, "mwh_estimate": 42, "status": "planning", "status_class": "", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Pargillis - Battery Storage", "name_short": "South Pargillis", "owner": "Renewable Connections Limited", "state": "scotland", "country": "uk", "lat": "56.049506", "long": "-3.381502", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.049506+-3.381502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thurleigh Road - Battery Energy Storage", "city": "", "id": "1081", "external_id": "9651", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "69", "power_mw": "69", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1081", "external_id": "9651", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Thurleigh Road - Battery Energy Storage", "external_id": "9651", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 69, "power_mw": 69, "owner": "Pathfinder Clean Energy UK Dev Limited", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.179248", "long": "-0.501493", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9651", "Record Last Updated (dd/mm/yyyy)": "30/06/2023", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Thurleigh Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "69", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thurleigh Road, Milton Ernest, Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK41 6AB", "X-coordinate": "502559", "Y-coordinate": "254502", "Planning Authority": "Bedford Borough Council", "Planning Application Reference": "23/01139/MAF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.179248", "long": "-0.501493", "status": "planning", "mw": 69, "ext_id": "9651"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2023", "to": "20/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9651", "Record Last Updated (dd/mm/yyyy)": "20/09/2021", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Thurleigh Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "69", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thurleigh Road, Milton Ernest, Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK41 6AB", "X-coordinate": "502559", "Y-coordinate": "254502", "Planning Authority": "Bedford Borough Council", "Planning Application Reference": "23/01139/MAF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.179248", "long": "-0.501493", "status": "planning", "mw": 69, "ext_id": "9651"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 69, "mwh_is_estimate": true, "mwh": 69, "mwh_estimate": 69, "status": "planning", "status_class": "", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Thurleigh Road - Battery Energy Storage", "name_short": "Thurleigh Road", "owner": "Pathfinder Clean Energy UK Dev Limited", "state": "eastern", "country": "uk", "lat": "52.179248", "long": "-0.501493", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.179248+-0.501493", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "city": "", "id": "1082", "external_id": "9796", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1082", "external_id": "9796", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "external_id": "9796", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Ridge Clean Energy Limited", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.880617", "long": "-1.156989", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9796", "Record Last Updated (dd/mm/yyyy)": "24/02/2023", "Operator (or Applicant)": "Ridge Clean Energy Limited", "Site Name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9795", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fields Farm Asher Lane Ruddington ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG11 6JX", "X-coordinate": "456829", "Y-coordinate": "331794", "Planning Authority": "Rushcliffe Borough Council", "Planning Application Reference": "23/00254/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.880617", "long": "-1.156989", "status": "planning", "mw": 49, "ext_id": "9796"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2023", "to": "13/10/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "02/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9796", "Record Last Updated (dd/mm/yyyy)": "13/10/2021", "Operator (or Applicant)": "Ridge Clean Energy Limited", "Site Name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9795", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fields Farm Asher Lane Ruddington ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG11 6JX", "X-coordinate": "456829", "Y-coordinate": "331794", "Planning Authority": "Rushcliffe Borough Council", "Planning Application Reference": "23/00254/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.880617", "long": "-1.156989", "status": "planning", "mw": 49, "ext_id": "9796"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "name_short": "Fair Oaks Renewable Energy Park - S...", "owner": "Ridge Clean Energy Limited", "state": "east midlands", "country": "uk", "lat": "52.880617", "long": "-1.156989", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.880617+-1.156989", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tontine Road - Battery Energy Storage System", "city": "", "id": "1083", "external_id": "9819", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "Coriolis Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1083", "external_id": "9819", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tontine Road - Battery Energy Storage System", "external_id": "9819", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "Coriolis Energy", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.536593", "long": "-2.720862", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9819", "Record Last Updated (dd/mm/yyyy)": "31/01/2023", "Operator (or Applicant)": "Coriolis Energy", "Site Name": "Tontine Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Ashton Hall, Tontine Road, Road Up Holland, Wigan", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "WN8 0NF.", "X-coordinate": "352321", "Y-coordinate": "404680", "Planning Authority": "West Lancashire Borough Council", "Planning Application Reference": "2022/1368/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.536593", "long": "-2.720862", "status": "planning", "mw": 70, "ext_id": "9819"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2023", "to": "19/10/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9819", "Record Last Updated (dd/mm/yyyy)": "19/10/2021", "Operator (or Applicant)": "Coriolis Energy", "Site Name": "Tontine Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Ashton Hall, Tontine Road, Road Up Holland, Wigan", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "WN8 0NF.", "X-coordinate": "352321", "Y-coordinate": "404680", "Planning Authority": "West Lancashire Borough Council", "Planning Application Reference": "2022/1368/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.536593", "long": "-2.720862", "status": "planning", "mw": 70, "ext_id": "9819"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tontine Road - Battery Energy Storage System", "name_short": "Tontine Road - Battery", "owner": "Coriolis Energy", "state": "north west", "country": "uk", "lat": "53.536593", "long": "-2.720862", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.536593+-2.720862", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Common Farm - Solar Farm & Battery Storage", "city": "", "id": "1084", "external_id": "9877", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Banks Renewable", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1084", "external_id": "9877", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Common Farm - Solar Farm & Battery Storage", "external_id": "9877", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Banks Renewable", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.372195", "long": "-1.247405", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9877", "Record Last Updated (dd/mm/yyyy)": "13/07/2023", "Operator (or Applicant)": "Banks Renewable", "Site Name": "Common Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9787", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Common Farm, Todwick Road, Dinnington, Rotherham", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S25 1ZX", "X-coordinate": "450170", "Y-coordinate": "386412", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/1203", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.372195", "long": "-1.247405", "status": "planning", "mw": 49, "ext_id": "9877"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/07/2023", "to": "01/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9877", "Record Last Updated (dd/mm/yyyy)": "01/11/2021", "Operator (or Applicant)": "Banks Renewable", "Site Name": "Common Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9787", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Common Farm, Todwick Road, Dinnington, Rotherham", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S25 1ZX", "X-coordinate": "450170", "Y-coordinate": "386412", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/1203", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.372195", "long": "-1.247405", "status": "planning", "mw": 49, "ext_id": "9877"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Common Farm - Solar Farm & Battery Storage", "name_short": "Common Farm - Solar Farm &", "owner": "Banks Renewable", "state": "yorkshire and humber", "country": "uk", "lat": "53.372195", "long": "-1.247405", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.372195+-1.247405", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Post Farm, Lytchett Minster - Battery Energy Storage", "city": "", "id": "1085", "external_id": "10291", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "S4N Lytchett Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1085", "external_id": "10291", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Post Farm, Lytchett Minster - Battery Energy Storage", "external_id": "10291", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "S4N Lytchett Limited", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.742116", "long": "-2.045484", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10291", "Record Last Updated (dd/mm/yyyy)": "31/05/2023", "Operator (or Applicant)": "S4N Lytchett Limited", "Site Name": "Post Farm, Lytchett Minster - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Post Farm Lytchett Minster Poole ", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH16 6AB", "X-coordinate": "396887", "Y-coordinate": "93613", "Planning Authority": "Purbeck District Council", "Planning Application Reference": "P/FUL/2023/02819", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.742116", "long": "-2.045484", "status": "planning", "mw": 32, "ext_id": "10291"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/05/2023", "to": "24/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10291", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "S4N Lytchett Limited", "Site Name": "Post Farm, Lytchett Minster - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Post Farm Lytchett Minster Poole ", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH16 6AB", "X-coordinate": "396887", "Y-coordinate": "93613", "Planning Authority": "Purbeck District Council", "Planning Application Reference": "P/FUL/2023/02819", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.742116", "long": "-2.045484", "status": "planning", "mw": 32, "ext_id": "10291"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "planning", "status_class": "", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Post Farm, Lytchett Minster - Battery Energy Storage", "name_short": "Post Farm, Lytchett Minster", "owner": "S4N Lytchett Limited", "state": "south west", "country": "uk", "lat": "50.742116", "long": "-2.045484", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.742116+-2.045484", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Huncoat Power Station - Battery Storage", "city": "", "id": "1086", "external_id": "10516", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1086", "external_id": "10516", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Huncoat Power Station - Battery Storage", "external_id": "10516", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "24 Power Limited", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.777226", "long": "-2.330459", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10516", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "24 Power Limited", "Site Name": "Huncoat Power Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13080", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of the A56 and to the Southwest of Junction 8 of the M65, east of the site of the former Huncoat Power Station", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB11 5QX", "X-coordinate": "378320", "Y-coordinate": "431261", "Planning Authority": "Burnley Borough Council", "Planning Application Reference": "FUL/2021/0601", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "18/01/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.777226", "long": "-2.330459", "status": "planning", "mw": 50, "ext_id": "10516"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/01/2023", "to": "01/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10516", "Record Last Updated (dd/mm/yyyy)": "01/02/2022", "Operator (or Applicant)": "24 Power Limited", "Site Name": "Huncoat Power Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13080", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of the A56 and to the Southwest of Junction 8 of the M65, east of the site of the former Huncoat Power Station", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB11 5QX", "X-coordinate": "378320", "Y-coordinate": "431261", "Planning Authority": "Burnley Borough Council", "Planning Application Reference": "FUL/2021/0601", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "18/01/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.777226", "long": "-2.330459", "status": "planning", "mw": 50, "ext_id": "10516"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Huncoat Power Station - Battery Storage", "name_short": "Huncoat Power Station", "owner": "24 Power Limited", "state": "north west", "country": "uk", "lat": "53.777226", "long": "-2.330459", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.777226+-2.330459", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Benthead Farm - Solar Farm & Battery Storage", "city": "", "id": "1087", "external_id": "10542", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "31", "power_mw": "31", "customer": "", "owner": "Locogen Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1087", "external_id": "10542", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Benthead Farm - Solar Farm & Battery Storage", "external_id": "10542", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 31, "power_mw": 31, "owner": "Locogen Limited", "status": "planning", "date_first_heard": "2023-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.682957", "long": "-4.648455", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10542", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "Locogen Limited", "Site Name": "Benthead Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10541", "Installed Capacity (MWelec)": "31.1", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Benhead Farm, Kilwinning", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA13 7RU", "X-coordinate": "233587", "Y-coordinate": "646455", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004702", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.682957", "long": "-4.648455", "status": "planning", "mw": 31, "ext_id": "10542"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/02/2023", "to": "03/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/08/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10542", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "Locogen Limited", "Site Name": "Benthead Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10541", "Installed Capacity (MWelec)": "31.1", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Benhead Farm, Kilwinning", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA13 7RU", "X-coordinate": "233587", "Y-coordinate": "646455", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004702", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/08/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.682957", "long": "-4.648455", "status": "planning", "mw": 31, "ext_id": "10542"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 31, "mwh_is_estimate": true, "mwh": 31, "mwh_estimate": 31, "status": "planning", "status_class": "", "date_first_heard": "2023-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Benthead Farm - Solar Farm & Battery Storage", "name_short": "Benthead Farm - Solar Farm &", "owner": "Locogen Limited", "state": "scotland", "country": "uk", "lat": "55.682957", "long": "-4.648455", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.682957+-4.648455", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Windyhill Battery Storage Facility", "city": "", "id": "1088", "external_id": "10596", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Energy GridPower Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1088", "external_id": "10596", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Windyhill Battery Storage Facility", "external_id": "10596", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Energy GridPower Ltd", "status": "planning", "date_first_heard": "2022-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.929502", "long": "-4.372131", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10596", "Record Last Updated (dd/mm/yyyy)": "15/07/2022", "Operator (or Applicant)": "Energy GridPower Ltd", "Site Name": "Windyhill Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Windyhill, Baljaffray Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G61 4RP", "X-coordinate": "251896", "Y-coordinate": "673257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003361", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/06/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.929502", "long": "-4.372131", "status": "planning", "mw": 200, "ext_id": "10596"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/07/2022", "to": "09/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10596", "Record Last Updated (dd/mm/yyyy)": "09/02/2022", "Operator (or Applicant)": "Energy GridPower Ltd", "Site Name": "Windyhill Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Windyhill, Baljaffray Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G61 4RP", "X-coordinate": "251896", "Y-coordinate": "673257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003361", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/06/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.929502", "long": "-4.372131", "status": "planning", "mw": 200, "ext_id": "10596"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Windyhill Battery Storage Facility", "name_short": "Windyhill", "owner": "Energy GridPower Ltd", "state": "scotland", "country": "uk", "lat": "55.929502", "long": "-4.372131", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.929502+-4.372131", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Earraghail Renewable Energy Development", "city": "", "id": "1089", "external_id": "10712", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1089", "external_id": "10712", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Earraghail Renewable Energy Development", "external_id": "10712", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2022-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.818067", "long": "-5.376614", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10712", "Record Last Updated (dd/mm/yyyy)": "02/03/2022", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Earraghail Renewable Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7873", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land approximately 1.2km south of Tarbert and 1.1km north of Skipness, Argyll & Bute", "County": "Argyll and Bute", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "188557", "Y-coordinate": "663472", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003421", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.818067", "long": "-5.376614", "status": "planning", "mw": 25, "ext_id": "10712"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10712", "Record Last Updated (dd/mm/yyyy)": "02/03/2022", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Earraghail Renewable Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7873", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land approximately 1.2km south of Tarbert and 1.1km north of Skipness, Argyll & Bute", "County": "Argyll and Bute", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "188557", "Y-coordinate": "663472", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003421", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.818067", "long": "-5.376614", "status": "planning", "mw": 25, "ext_id": "10712"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Earraghail Renewable Energy Development", "name_short": "Earraghail Renewable Energy Develop...", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "55.818067", "long": "-5.376614", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.818067+-5.376614", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Smithyard Lane - Battery Storage", "city": "", "id": "1090", "external_id": "10766", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Conrad Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1090", "external_id": "10766", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Smithyard Lane - Battery Storage", "external_id": "10766", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Conrad Energy Limited", "status": "planning", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.168059", "long": "-3.342909", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10766", "Record Last Updated (dd/mm/yyyy)": "16/02/2023", "Operator (or Applicant)": "Conrad Energy Limited", "Site Name": "Smithyard Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "adjacent to Gas Substation, Smithyard Lane, Williton ", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA23 0NA", "X-coordinate": "306205", "Y-coordinate": "141837", "Planning Authority": "Somerset West And Taunton", "Planning Application Reference": "3/39/22/007 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.168059", "long": "-3.342909", "status": "planning", "mw": 15, "ext_id": "10766"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/02/2023", "to": "09/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10766", "Record Last Updated (dd/mm/yyyy)": "09/03/2022", "Operator (or Applicant)": "Conrad Energy Limited", "Site Name": "Smithyard Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "adjacent to Gas Substation, Smithyard Lane, Williton ", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA23 0NA", "X-coordinate": "306205", "Y-coordinate": "141837", "Planning Authority": "Somerset West And Taunton", "Planning Application Reference": "3/39/22/007 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.168059", "long": "-3.342909", "status": "planning", "mw": 15, "ext_id": "10766"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Smithyard Lane - Battery Storage", "name_short": "Smithyard Lane", "owner": "Conrad Energy Limited", "state": "south west", "country": "uk", "lat": "51.168059", "long": "-3.342909", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.168059+-3.342909", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ballingall Farm, Leslie - Battery Energy Storage System", "city": "", "id": "1091", "external_id": "10825", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "43", "power_mw": "43", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1091", "external_id": "10825", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ballingall Farm, Leslie - Battery Energy Storage System", "external_id": "10825", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 43, "power_mw": 43, "owner": "EcoDev Group Limited", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.21286", "long": "-3.21106", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10825", "Record Last Updated (dd/mm/yyyy)": "25/05/2023", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Ballingall Farm, Leslie - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "43", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ballingall Farm, Leslie, Glenrothes ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY6 3HD", "X-coordinate": "324983", "Y-coordinate": "702913", "Planning Authority": "Fife Council", "Planning Application Reference": "23/00971/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.21286", "long": "-3.21106", "status": "planning", "mw": 43, "ext_id": "10825"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/05/2023", "to": "18/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "14/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10825", "Record Last Updated (dd/mm/yyyy)": "18/03/2022", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Ballingall Farm, Leslie - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "43", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ballingall Farm, Leslie, Glenrothes ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY6 3HD", "X-coordinate": "324983", "Y-coordinate": "702913", "Planning Authority": "Fife Council", "Planning Application Reference": "23/00971/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.21286", "long": "-3.21106", "status": "planning", "mw": 43, "ext_id": "10825"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 43, "mwh_is_estimate": true, "mwh": 43, "mwh_estimate": 43, "status": "planning", "status_class": "", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ballingall Farm, Leslie - Battery Energy Storage System", "name_short": "Ballingall Farm, Leslie - Battery", "owner": "EcoDev Group Limited", "state": "scotland", "country": "uk", "lat": "56.21286", "long": "-3.21106", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.21286+-3.21106", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bolney Substation - Battery Storage", "city": "", "id": "1092", "external_id": "10843", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "264", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1092", "external_id": "10843", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bolney Substation - Battery Storage", "external_id": "10843", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 264, "power_mw": 264, "owner": "One Planet Developments Limited", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.976809", "long": "-0.228662", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10843", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Bolney Substation - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "264", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land off Bob Lane, North Lodge, Twineham, Haywards Heath", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "RH17 5NH", "X-coordinate": "524452", "Y-coordinate": "121204", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/23/0769", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.976809", "long": "-0.228662", "status": "planning", "mw": 264, "ext_id": "10843"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2023", "to": "22/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10843", "Record Last Updated (dd/mm/yyyy)": "22/03/2022", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Bolney Substation - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "264", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land off Bob Lane, North Lodge, Twineham, Haywards Heath", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "RH17 5NH", "X-coordinate": "524452", "Y-coordinate": "121204", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/23/0769", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.976809", "long": "-0.228662", "status": "planning", "mw": 264, "ext_id": "10843"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 264, "mwh_is_estimate": true, "mwh": 264, "mwh_estimate": 264, "status": "planning", "status_class": "", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bolney Substation - Battery Storage", "name_short": "Bolney Substation", "owner": "One Planet Developments Limited", "state": "south east", "country": "uk", "lat": "50.976809", "long": "-0.228662", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.976809+-0.228662", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Station Lane, Burton Leonard - Battery Energy Storage System", "city": "", "id": "1093", "external_id": "10893", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "33", "power_mw": "33", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1093", "external_id": "10893", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wormald Green - Battery Energy Storage System", "external_id": "10893", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 33, "power_mw": 33, "owner": "Harmony Energy Limited", "status": "construction", "date_first_heard": "2022-09-26", "start_construction": "2023-08-26", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.075167", "long": "-1.523157", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10893", "Record Last Updated (dd/mm/yyyy)": "27/09/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Station Lane, Burton Leonard - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "33", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Station Lane Burton Leonard ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HG3 3RX", "X-coordinate": "431299", "Y-coordinate": "464465", "Planning Authority": "Harrogate Borough Council", "Planning Application Reference": "22/00777/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.075167", "long": "-1.523157", "status": "planning", "mw": 33, "ext_id": "10893"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2022", "to": "26/08/2023", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Station Lane, Burton Leonard - Battery Energy Storage System", "to": "Wormald Green - Battery Energy Storage System", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "26/08/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "10893", "Record Last Updated (dd/mm/yyyy)": "26/08/2023", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Wormald Green - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "33", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Station Lane Burton Leonard ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HG3 3RX", "X-coordinate": "431299", "Y-coordinate": "464465", "Planning Authority": "Harrogate Borough Council", "Planning Application Reference": "22/00777/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2025", "Under Construction": "26/08/2023", "Operational": "", "Heat Network Ref": "", "lat": "54.075167", "long": "-1.523157", "status": "construction", "mw": 33, "ext_id": "10893"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-27", "start_construction": "2023-08-26", "start_operation": ""}, "month_disappeared": ""}, "mw": 33, "mwh_is_estimate": true, "mwh": 33, "mwh_estimate": 33, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09-26", "start_construction": "2023-08-26", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wormald Green - Battery Energy Storage System", "name_short": "Wormald Green - Battery", "owner": "Harmony Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "54.075167", "long": "-1.523157", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.075167+-1.523157", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Law Of Doune Road, Macduff - Battery Storage", "city": "", "id": "1094", "external_id": "10894", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1094", "external_id": "10894", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Law Of Doune Road, Macduff - Battery Storage", "external_id": "10894", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Intelligent Land Investments Group Plc", "status": "planning", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.66067", "long": "-2.501136", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10894", "Record Last Updated (dd/mm/yyyy)": "16/02/2023", "Operator (or Applicant)": "Intelligent Land Investments Group Plc", "Site Name": "Law Of Doune Road, Macduff - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Macduff Electricity Substation Law Of Doune Road Macduff ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB45 3QL", "X-coordinate": "370197", "Y-coordinate": "863530", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0130", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.66067", "long": "-2.501136", "status": "planning", "mw": 49, "ext_id": "10894"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/02/2023", "to": "07/12/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10894", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Intelligent Land Investments Group Plc", "Site Name": "Law Of Doune Road, Macduff - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Macduff Electricity Substation Law Of Doune Road Macduff ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB45 3QL", "X-coordinate": "370197", "Y-coordinate": "863530", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0130", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.66067", "long": "-2.501136", "status": "planning", "mw": 49, "ext_id": "10894"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Law Of Doune Road, Macduff - Battery Storage", "name_short": "Law Of Doune Road, Macduff", "owner": "Intelligent Land Investments Group Plc", "state": "scotland", "country": "uk", "lat": "57.66067", "long": "-2.501136", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.66067+-2.501136", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hawthorn Grid Site - Battery Storage", "city": "", "id": "1095", "external_id": "10896", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1095", "external_id": "10896", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hawthorn Grid Site - Battery Storage", "external_id": "10896", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2022-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.801397", "long": "-1.394172", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10896", "Record Last Updated (dd/mm/yyyy)": "05/12/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Hawthorn Grid Site - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawthorn Grid Site Murton", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 2RX", "X-coordinate": "439044", "Y-coordinate": "545337", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/00747/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.801397", "long": "-1.394172", "status": "planning", "mw": 49, "ext_id": "10896"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/12/2022", "to": "30/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10896", "Record Last Updated (dd/mm/yyyy)": "30/03/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Hawthorn Grid Site - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawthorn Grid Site Murton", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 2RX", "X-coordinate": "439044", "Y-coordinate": "545337", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/00747/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.801397", "long": "-1.394172", "status": "planning", "mw": 49, "ext_id": "10896"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hawthorn Grid Site - Battery Storage", "name_short": "Hawthorn Grid Site", "owner": "Harmony Energy Limited", "state": "north east", "country": "uk", "lat": "54.801397", "long": "-1.394172", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.801397+-1.394172", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Burton Solar Project", "city": "", "id": "1096", "external_id": "10917", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Island Green Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1096", "external_id": "10917", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Burton Solar Project", "external_id": "10917", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Island Green Power", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.292622", "long": "-0.677455", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10917", "Record Last Updated (dd/mm/yyyy)": "11/04/2023", "Operator (or Applicant)": "Island Green Power", "Site Name": "West Burton Solar Project", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10916", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O River Trent, S/O the A1500 & N/O Saxilby, West Lindsey, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN21", "X-coordinate": "488253", "Y-coordinate": "378111", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010132", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.292622", "long": "-0.677455", "status": "planning", "mw": 20, "ext_id": "10917"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2023", "to": "01/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10917", "Record Last Updated (dd/mm/yyyy)": "01/04/2022", "Operator (or Applicant)": "Island Green Power", "Site Name": "West Burton Solar Project", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10916", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O River Trent, S/O the A1500 & N/O Saxilby, West Lindsey, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN21", "X-coordinate": "488253", "Y-coordinate": "378111", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010132", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.292622", "long": "-0.677455", "status": "planning", "mw": 20, "ext_id": "10917"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Burton Solar Project", "name_short": "West Burton Solar", "owner": "Island Green Power", "state": "east midlands", "country": "uk", "lat": "53.292622", "long": "-0.677455", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.292622+-0.677455", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coalburn II Energy - Battery Storage", "city": "", "id": "1097", "external_id": "11034", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1097", "external_id": "11034", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coalburn II Energy - Battery Storage", "external_id": "11034", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Alcemi Storage Development Limited", "status": "planning", "date_first_heard": "2023-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.610593", "long": "-3.848623", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11034", "Record Last Updated (dd/mm/yyyy)": "10/07/2023", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Coalburn II Energy - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "700m N/O Birkhill Mill, Cairnhouses Road, Lanark", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11", "X-coordinate": "283651", "Y-coordinate": "636772", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003458", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.610593", "long": "-3.848623", "status": "planning", "mw": 500, "ext_id": "11034"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/07/2023", "to": "20/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11034", "Record Last Updated (dd/mm/yyyy)": "20/04/2022", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Coalburn II Energy - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "700m N/O Birkhill Mill, Cairnhouses Road, Lanark", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11", "X-coordinate": "283651", "Y-coordinate": "636772", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003458", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.610593", "long": "-3.848623", "status": "planning", "mw": 500, "ext_id": "11034"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coalburn II Energy - Battery Storage", "name_short": "Coalburn II Energy", "owner": "Alcemi Storage Development Limited", "state": "scotland", "country": "uk", "lat": "55.610593", "long": "-3.848623", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.610593+-3.848623", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Well Street - Battery Storage", "city": "", "id": "1098", "external_id": "11473", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Larkfleet Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1098", "external_id": "11473", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Well Street - Battery Storage", "external_id": "11473", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Larkfleet Group", "status": "planning", "date_first_heard": "2023-05-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.846443", "long": "-4.435761", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11473", "Record Last Updated (dd/mm/yyyy)": "22/06/2023", "Operator (or Applicant)": "Larkfleet Group", "Site Name": "Well Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Gasholder Station At Junction With Underwood Road Well Street ", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA1 2SL", "X-coordinate": "247596", "Y-coordinate": "664154", "Planning Authority": "Renfrewshire Council", "Planning Application Reference": "23/0018/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/05/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.846443", "long": "-4.435761", "status": "planning", "mw": 49, "ext_id": "11473"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/06/2023", "to": "31/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11473", "Record Last Updated (dd/mm/yyyy)": "31/03/2023", "Operator (or Applicant)": "Larkfleet Group", "Site Name": "Well Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Gasholder Station At Junction With Underwood Road Well Street ", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA1 2SL", "X-coordinate": "247596", "Y-coordinate": "664154", "Planning Authority": "Renfrewshire Council", "Planning Application Reference": "23/0018/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/05/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.846443", "long": "-4.435761", "status": "planning", "mw": 49, "ext_id": "11473"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-05-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Well Street - Battery Storage", "name_short": "Well Street", "owner": "Larkfleet Group", "state": "scotland", "country": "uk", "lat": "55.846443", "long": "-4.435761", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.846443+-4.435761", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kellwood Road - Battery Storage", "city": "", "id": "1099", "external_id": "11545", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Geocore Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1099", "external_id": "11545", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kellwood Road - Battery Storage", "external_id": "11545", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Geocore Limited", "status": "planning", "date_first_heard": "2023-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.068487", "long": "-3.589623", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11545", "Record Last Updated (dd/mm/yyyy)": "17/04/2023", "Operator (or Applicant)": "Geocore Limited", "Site Name": "Kellwood Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kellwood Road ", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG1 2JR", "X-coordinate": "298587", "Y-coordinate": "576046", "Planning Authority": "Dumfries & Galloway Council", "Planning Application Reference": "23/0513/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.068487", "long": "-3.589623", "status": "planning", "mw": 49, "ext_id": "11545"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/04/2023", "to": "24/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11545", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Geocore Limited", "Site Name": "Kellwood Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kellwood Road ", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG1 2JR", "X-coordinate": "298587", "Y-coordinate": "576046", "Planning Authority": "Dumfries & Galloway Council", "Planning Application Reference": "23/0513/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.068487", "long": "-3.589623", "status": "planning", "mw": 49, "ext_id": "11545"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kellwood Road - Battery Storage", "name_short": "Kellwood Road", "owner": "Geocore Limited", "state": "scotland", "country": "uk", "lat": "55.068487", "long": "-3.589623", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.068487+-3.589623", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holmston Road - Battery Storage Facility", "city": "", "id": "1100", "external_id": "11679", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy Systems Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1100", "external_id": "11679", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holmston Road - Battery Storage Facility", "external_id": "11679", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Renewable Energy Systems Limited", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.455039", "long": "-4.588387", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11679", "Record Last Updated (dd/mm/yyyy)": "06/07/2023", "Operator (or Applicant)": "Renewable Energy Systems Limited", "Site Name": "Holmston Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holmston Farm Holmston Road Ayr ", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 5JJ", "X-coordinate": "236417", "Y-coordinate": "620956", "Planning Authority": "South Ayrshire Council", "Planning Application Reference": "23/00176/APPM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/06/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.455039", "long": "-4.588387", "status": "planning", "mw": 49, "ext_id": "11679"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/07/2023", "to": "18/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "23/00176/APPM", "to": "22/00505/PAN", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "30/06/2023", "to": "30/06/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11679", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Renewable Energy Systems Limited", "Site Name": "Holmston Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holmston Farm Holmston Road Ayr ", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 5JJ", "X-coordinate": "236417", "Y-coordinate": "620956", "Planning Authority": "South Ayrshire Council", "Planning Application Reference": "22/00505/PAN", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.455039", "long": "-4.588387", "status": "planning", "mw": 49, "ext_id": "11679"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holmston Road - Battery Storage Facility", "name_short": "Holmston Road", "owner": "Renewable Energy Systems Limited", "state": "scotland", "country": "uk", "lat": "55.455039", "long": "-4.588387", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.455039+-4.588387", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "city": "", "id": "1101", "external_id": "11680", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "240", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1101", "external_id": "11680", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "external_id": "11680", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 240, "power_mw": 240, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.700073", "long": "-1.129543", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11680", "Record Last Updated (dd/mm/yyyy)": "05/04/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "240", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Springfield Farm Weeland Road Hensall Selby Goole ", "County": "North Yorkshire ", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0RL ", "X-coordinate": "457566", "Y-coordinate": "422978", "Planning Authority": "Selby District Council", "Planning Application Reference": "2023/0285/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.700073", "long": "-1.129543", "status": "planning", "mw": 240, "ext_id": "11680"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/04/2023", "to": "18/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "2023/0285/FULM", "to": "2022/0813/SCN", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11680", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "240", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Springfield Farm Weeland Road Hensall Selby Goole ", "County": "North Yorkshire ", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0RL ", "X-coordinate": "457566", "Y-coordinate": "422978", "Planning Authority": "Selby District Council", "Planning Application Reference": "2022/0813/SCN", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.700073", "long": "-1.129543", "status": "planning", "mw": 240, "ext_id": "11680"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 240, "mwh_is_estimate": true, "mwh": 240, "mwh_estimate": 240, "status": "planning", "status_class": "", "date_first_heard": "2023-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "name_short": "Springfield Farm, Hensall - Battery...", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.700073", "long": "-1.129543", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.700073+-1.129543", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Haughend Farm - Alyth Battery Energy Storage System", "city": "", "id": "1102", "external_id": "11858", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "450", "power_mw": "450", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1102", "external_id": "11858", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Haughend Farm - Alyth Battery Energy Storage System", "external_id": "11858", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 450, "power_mw": 450, "owner": "EcoDev Group Limited", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.6107", "long": "-3.156364", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11858", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Haughend Farm - Alyth Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "450", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Haughend Farm, Meigle, Blairgowrie", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH12 8RJ", "X-coordinate": "329120", "Y-coordinate": "747134", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004631", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.6107", "long": "-3.156364", "status": "planning", "mw": 450, "ext_id": "11858"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11858", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Haughend Farm - Alyth Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "450", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Haughend Farm, Meigle, Blairgowrie", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH12 8RJ", "X-coordinate": "329120", "Y-coordinate": "747134", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004631", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.6107", "long": "-3.156364", "status": "planning", "mw": 450, "ext_id": "11858"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 450, "mwh_is_estimate": true, "mwh": 450, "mwh_estimate": 450, "status": "planning", "status_class": "", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Haughend Farm - Alyth Battery Energy Storage System", "name_short": "Haughend Farm - Alyth Battery", "owner": "EcoDev Group Limited", "state": "scotland", "country": "uk", "lat": "56.6107", "long": "-3.156364", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.6107+-3.156364", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eccles Battery Energy Storage System", "city": "", "id": "1103", "external_id": "11867", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Weaver Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1103", "external_id": "11867", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Eccles Battery Energy Storage System", "external_id": "11867", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": " Zenobe Energy Limited", "status": "planning", "date_first_heard": "2023-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.663528", "long": "-2.330063", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11867", "Record Last Updated (dd/mm/yyyy)": "29/09/2022", "Operator (or Applicant)": "Weaver Power Limited", "Site Name": "Eccles Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, Coldstream", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 ", "X-coordinate": "379334", "Y-coordinate": "641162", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004601", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.663528", "long": "-2.330063", "status": "planning", "mw": 400, "ext_id": "11867"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/09/2022", "to": "12/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Weaver Power Limited", "to": " Zenobe Energy Limited", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/08/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11867", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": " Zenobe Energy Limited", "Site Name": "Eccles Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, Coldstream", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 ", "X-coordinate": "379334", "Y-coordinate": "641162", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004601", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/08/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.663528", "long": "-2.330063", "status": "planning", "mw": 400, "ext_id": "11867"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Eccles Battery Energy Storage System", "name_short": "Eccles Battery", "owner": " Zenobe Energy Limited", "state": "scotland", "country": "uk", "lat": "55.663528", "long": "-2.330063", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.663528+-2.330063", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middleton Road - Linwood Battery Energy Storage System", "city": "", "id": "1104", "external_id": "11868", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "69", "power_mw": "69", "customer": "", "owner": "Bluestone Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1104", "external_id": "11868", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Middleton Road - Linwood Battery Energy Storage System", "external_id": "11868", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 69, "power_mw": 69, "owner": "Bluestone Energy Limited", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.852955", "long": "-4.487618", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11868", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "Bluestone Energy Limited", "Site Name": "Middleton Road - Linwood Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "69", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Road, Linwood, Paisley", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA3 3DP", "X-coordinate": "244376", "Y-coordinate": "664994", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004543", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.852955", "long": "-4.487618", "status": "planning", "mw": 69, "ext_id": "11868"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11868", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "Bluestone Energy Limited", "Site Name": "Middleton Road - Linwood Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "69", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Road, Linwood, Paisley", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA3 3DP", "X-coordinate": "244376", "Y-coordinate": "664994", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004543", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.852955", "long": "-4.487618", "status": "planning", "mw": 69, "ext_id": "11868"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 69, "mwh_is_estimate": true, "mwh": 69, "mwh_estimate": 69, "status": "planning", "status_class": "", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Middleton Road - Linwood Battery Energy Storage System", "name_short": "Middleton Road - Linwood Battery", "owner": "Bluestone Energy Limited", "state": "scotland", "country": "uk", "lat": "55.852955", "long": "-4.487618", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.852955+-4.487618", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Burton Power Station, North Road - Battery Storage", "city": "", "id": "1105", "external_id": "11928", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "West Burton Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1105", "external_id": "11928", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Burton Power Station, North Road - Battery Storage", "external_id": "11928", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "West Burton Energy Limited", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.36535", "long": "-0.819403", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11928", "Record Last Updated (dd/mm/yyyy)": "25/01/2023", "Operator (or Applicant)": "West Burton Energy Limited", "Site Name": "West Burton Power Station, North Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Burton Power Station North Road West Burton", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 9BL", "X-coordinate": "478658", "Y-coordinate": "386036", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "22/01713/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.36535", "long": "-0.819403", "status": "planning", "mw": 500, "ext_id": "11928"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11928", "Record Last Updated (dd/mm/yyyy)": "25/01/2023", "Operator (or Applicant)": "West Burton Energy Limited", "Site Name": "West Burton Power Station, North Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Burton Power Station North Road West Burton", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 9BL", "X-coordinate": "478658", "Y-coordinate": "386036", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "22/01713/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.36535", "long": "-0.819403", "status": "planning", "mw": 500, "ext_id": "11928"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Burton Power Station, North Road - Battery Storage", "name_short": "West Burton Power Station, North Ro...", "owner": "West Burton Energy Limited", "state": "east midlands", "country": "uk", "lat": "53.36535", "long": "-0.819403", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.36535+-0.819403", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Normanton Energy Reserve - Battery Storage", "city": "", "id": "1106", "external_id": "11988", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Exagen SPVO2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1106", "external_id": "11988", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Normanton Energy Reserve - Battery Storage", "external_id": "11988", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Exagen SPVO2 Limited", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.58755", "long": "-1.269665", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11988", "Record Last Updated (dd/mm/yyyy)": "18/01/2023", "Operator (or Applicant)": "Exagen SPVO2 Limited", "Site Name": "Normanton Energy Reserve - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "NW/O Earl Shilton Road Thurlaston ", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE9 7TG", "X-coordinate": "449577", "Y-coordinate": "299111", "Planning Authority": "Blaby District Council", "Planning Application Reference": "22/1204/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.58755", "long": "-1.269665", "status": "planning", "mw": 500, "ext_id": "11988"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11988", "Record Last Updated (dd/mm/yyyy)": "18/01/2023", "Operator (or Applicant)": "Exagen SPVO2 Limited", "Site Name": "Normanton Energy Reserve - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "NW/O Earl Shilton Road Thurlaston ", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE9 7TG", "X-coordinate": "449577", "Y-coordinate": "299111", "Planning Authority": "Blaby District Council", "Planning Application Reference": "22/1204/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.58755", "long": "-1.269665", "status": "planning", "mw": 500, "ext_id": "11988"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Normanton Energy Reserve - Battery Storage", "name_short": "Normanton Energy Reserve", "owner": "Exagen SPVO2 Limited", "state": "east midlands", "country": "uk", "lat": "52.58755", "long": "-1.269665", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.58755+-1.269665", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Highfield Energy Park", "city": "", "id": "1107", "external_id": "12312", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1107", "external_id": "12312", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Highfield Energy Park", "external_id": "12312", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Exagen", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.897962", "long": "-1.902172", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12312", "Record Last Updated (dd/mm/yyyy)": "09/06/2023", "Operator (or Applicant)": "Exagen", "Site Name": "Highfield Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12311", "Installed Capacity (MWelec)": "12.5", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South West Of Whittonstall", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH8 9LQ", "X-coordinate": "406372", "Y-coordinate": "555919", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "23/01717/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.897962", "long": "-1.902172", "status": "planning", "mw": 12, "ext_id": "12312"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12312", "Record Last Updated (dd/mm/yyyy)": "09/06/2023", "Operator (or Applicant)": "Exagen", "Site Name": "Highfield Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12311", "Installed Capacity (MWelec)": "12.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South West Of Whittonstall", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH8 9LQ", "X-coordinate": "406372", "Y-coordinate": "555919", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "23/01717/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.897962", "long": "-1.902172", "status": "planning", "mw": 12, "ext_id": "12312"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Highfield Energy Park", "name_short": "Highfield Energy Park", "owner": "Exagen", "state": "north east", "country": "uk", "lat": "54.897962", "long": "-1.902172", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.897962+-1.902172", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "city": "", "id": "1108", "external_id": "12361", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1108", "external_id": "12361", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "external_id": "12361", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "One Planet Developments Limited", "status": "planning", "date_first_heard": "2023-09-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.636363", "long": "-2.265832", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12361", "Record Last Updated (dd/mm/yyyy)": "01/02/2023", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Meetlaw Farm Fordoun Laurencekirk ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB30 1LL ", "X-coordinate": "381297", "Y-coordinate": "81886", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2676", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.636363", "long": "-2.265832", "status": "planning", "mw": 49, "ext_id": "12361"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2023", "to": "04/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "19/09/2029", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12361", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Meetlaw Farm Fordoun Laurencekirk ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB30 1LL ", "X-coordinate": "381297", "Y-coordinate": "81886", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2676", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/09/2029", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.636363", "long": "-2.265832", "status": "planning", "mw": 49, "ext_id": "12361"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "name_short": "Meetlaw Farm, Fordoun - Battery", "owner": "One Planet Developments Limited", "state": "scotland", "country": "uk", "lat": "50.636363", "long": "-2.265832", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.636363+-2.265832", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Libra Energy Stability Project - Battery Energy Storage", "city": "", "id": "1109", "external_id": "12443", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Lightrock Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1109", "external_id": "12443", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Libra Energy Stability Project - Battery Energy Storage", "external_id": "12443", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Lightrock Power", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.973245", "long": "-0.224354", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12443", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Lightrock Power", "Site Name": "Libra Energy Stability Project - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coombe Farm, Bob Lane, Twineham, Haywards Heath", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "RH17 5NH", "X-coordinate": "524764", "Y-coordinate": "120815", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/23/1184", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.973245", "long": "-0.224354", "status": "planning", "mw": 100, "ext_id": "12443"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12443", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Lightrock Power", "Site Name": "Libra Energy Stability Project - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coombe Farm, Bob Lane, Twineham, Haywards Heath", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "RH17 5NH", "X-coordinate": "524764", "Y-coordinate": "120815", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/23/1184", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.973245", "long": "-0.224354", "status": "planning", "mw": 100, "ext_id": "12443"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Libra Energy Stability Project - Battery Energy Storage", "name_short": "Libra Energy Stability Project", "owner": "Lightrock Power", "state": "south east", "country": "uk", "lat": "50.973245", "long": "-0.224354", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.973245+-0.224354", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thorpe Marsh Power Station - Battery Energy Storage", "city": "", "id": "1110", "external_id": "12453", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1450", "power_mw": "1450", "customer": "", "owner": "Banks Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1110", "external_id": "12453", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Thorpe Marsh Power Station - Battery Energy Storage", "external_id": "12453", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 1450, "power_mw": 1450, "owner": "West Burton Energy", "status": "planning", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.580257", "long": "-1.085062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12453", "Record Last Updated (dd/mm/yyyy)": "06/02/2023", "Operator (or Applicant)": "Banks Renewables Limited", "Site Name": "Thorpe Marsh Power Station - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1450", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thorpe Marsh Power Station Marsh Lane Barnby Dun Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN3 1ET", "X-coordinate": "460674", "Y-coordinate": "409685", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/00022/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.580257", "long": "-1.085062", "status": "planning", "mw": 1450, "ext_id": "12453"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/02/2023", "to": "12/10/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Banks Renewables Limited", "to": "West Burton Energy", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12453", "Record Last Updated (dd/mm/yyyy)": "12/10/2023", "Operator (or Applicant)": "West Burton Energy", "Site Name": "Thorpe Marsh Power Station - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1450", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thorpe Marsh Power Station Marsh Lane Barnby Dun Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN3 1ET", "X-coordinate": "460674", "Y-coordinate": "409685", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/00022/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.580257", "long": "-1.085062", "status": "planning", "mw": 1450, "ext_id": "12453"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1450, "mwh_is_estimate": true, "mwh": 1450, "mwh_estimate": 1450, "status": "planning", "status_class": "", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Thorpe Marsh Power Station - Battery Energy Storage", "name_short": "Thorpe Marsh Power Station", "owner": "West Burton Energy", "state": "yorkshire and humber", "country": "uk", "lat": "53.580257", "long": "-1.085062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.580257+-1.085062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackdyke Farm, Blackford - Battery Storage", "city": "", "id": "1111", "external_id": "12710", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1111", "external_id": "12710", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackdyke Farm, Blackford - Battery Storage", "external_id": "12710", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 340, "power_mw": 340, "owner": "Novus Renewable Services Limited / Story Construction", "status": "planning", "date_first_heard": "2023-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.953508", "long": "-2.968236", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12710", "Record Last Updated (dd/mm/yyyy)": "12/07/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Blackdyke Farm, Blackford - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of Blackdyke Farm, Blackford", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4EY", "X-coordinate": "338089", "Y-coordinate": "562525", "Planning Authority": "Carlisle Council", "Planning Application Reference": "23/0444", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.953508", "long": "-2.968236", "status": "planning", "mw": 400, "ext_id": "12710"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/07/2023", "to": "10/10/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Novus Renewable Services Limited", "to": "Novus Renewable Services Limited / Story Construction", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "400", "to": "340", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Carlisle Council", "to": "Carlisle City Council", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "23/0444", "to": "23/0659", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "21/06/2023", "to": "22/09/2023", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 400, "to": 340, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12710", "Record Last Updated (dd/mm/yyyy)": "10/10/2023", "Operator (or Applicant)": "Novus Renewable Services Limited / Story Construction", "Site Name": "Blackdyke Farm, Blackford - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "340", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of Blackdyke Farm, Blackford", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4EY", "X-coordinate": "338089", "Y-coordinate": "562525", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0659", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.953508", "long": "-2.968236", "status": "planning", "mw": 340, "ext_id": "12710"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 340, "mwh_is_estimate": true, "mwh": 340, "mwh_estimate": 340, "status": "planning", "status_class": "", "date_first_heard": "2023-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackdyke Farm, Blackford - Battery Storage", "name_short": "Blackdyke Farm, Blackford", "owner": "Novus Renewable Services Limited / Story Construction", "state": "north west", "country": "uk", "lat": "54.953508", "long": "-2.968236", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.953508+-2.968236", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "A981 Fraserburgh - Battery Energy Storage", "city": "", "id": "1112", "external_id": "12711", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Fraserburgh Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1112", "external_id": "12711", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "A981 Fraserburgh - Battery Energy Storage", "external_id": "12711", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Fraserburgh Energy Limited", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.607237", "long": "-2.109915", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12711", "Record Last Updated (dd/mm/yyyy)": "18/04/2023", "Operator (or Applicant)": "Fraserburgh Energy Limited", "Site Name": "A981 Fraserburgh - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of A981 ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 6SN", "X-coordinate": "393531", "Y-coordinate": "857476", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0193", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/04/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.607237", "long": "-2.109915", "status": "planning", "mw": 45, "ext_id": "12711"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/04/2023", "to": "03/07/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12711", "Record Last Updated (dd/mm/yyyy)": "03/07/2023", "Operator (or Applicant)": "Fraserburgh Energy Limited", "Site Name": "A981 Fraserburgh - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of A981 ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 6SN", "X-coordinate": "393531", "Y-coordinate": "857476", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0193", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/04/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.607237", "long": "-2.109915", "status": "planning", "mw": 45, "ext_id": "12711"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "A981 Fraserburgh - Battery Energy Storage", "name_short": "A981 Fraserburgh", "owner": "Fraserburgh Energy Limited", "state": "scotland", "country": "uk", "lat": "57.607237", "long": "-2.109915", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.607237+-2.109915", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "city": "", "id": "1113", "external_id": "12760", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1113", "external_id": "12760", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "external_id": "12760", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Renewable Energy Systems (RES)", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.117304", "long": "-3.068369", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12760", "Record Last Updated (dd/mm/yyyy)": "07/12/2022", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10999", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Solwaybank, Allfornought Hill, Langholm", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG13", "X-coordinate": "331955", "Y-coordinate": "580845", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003463", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.117304", "long": "-3.068369", "status": "planning", "mw": 45, "ext_id": "12760"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12760", "Record Last Updated (dd/mm/yyyy)": "07/12/2022", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10999", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Solwaybank, Allfornought Hill, Langholm", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG13", "X-coordinate": "331955", "Y-coordinate": "580845", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003463", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.117304", "long": "-3.068369", "status": "planning", "mw": 45, "ext_id": "12760"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "name_short": "Bloch Wind Farm & Battery Storage (...", "owner": "Renewable Energy Systems (RES)", "state": "scotland", "country": "uk", "lat": "55.117304", "long": "-3.068369", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.117304+-3.068369", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "city": "", "id": "1114", "external_id": "12820", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Noriker Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1114", "external_id": "12820", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "external_id": "12820", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 350, "power_mw": 350, "owner": "Noriker Power Limited", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.555129", "long": "-4.447525", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12820", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "Noriker Power Limited", "Site Name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "350", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Camsiscan Farm, Craigie, Kilmarnock South, Kilmarnock", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JT", "X-coordinate": "245715", "Y-coordinate": "631769", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "ECU00004658", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.555129", "long": "-4.447525", "status": "planning", "mw": 350, "ext_id": "12820"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12820", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "Noriker Power Limited", "Site Name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "350", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Camsiscan Farm, Craigie, Kilmarnock South, Kilmarnock", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JT", "X-coordinate": "245715", "Y-coordinate": "631769", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "ECU00004658", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.555129", "long": "-4.447525", "status": "planning", "mw": 350, "ext_id": "12820"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 350, "mwh_is_estimate": true, "mwh": 350, "mwh_estimate": 350, "status": "planning", "status_class": "", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "name_short": "Camsiscan Farm, Craigie - Battery", "owner": "Noriker Power Limited", "state": "scotland", "country": "uk", "lat": "55.555129", "long": "-4.447525", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.555129+-4.447525", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Staythorpe Road, Averham - Battery Storage", "city": "", "id": "1115", "external_id": "12893", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "SSE Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1115", "external_id": "12893", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Staythorpe Road, Averham - Battery Storage", "external_id": "12893", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 300, "power_mw": 300, "owner": "SSE Battery Storage Limited", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.081313", "long": "-0.862764", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12893", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "SSE Battery Storage Limited", "Site Name": "Staythorpe Road, Averham - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Staythorpe Road Averham", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG23 5RA", "X-coordinate": "476275", "Y-coordinate": "354392", "Planning Authority": "Newark Council", "Planning Application Reference": "23/00317/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.081313", "long": "-0.862764", "status": "planning", "mw": 300, "ext_id": "12893"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12893", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "SSE Battery Storage Limited", "Site Name": "Staythorpe Road, Averham - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Staythorpe Road Averham", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG23 5RA", "X-coordinate": "476275", "Y-coordinate": "354392", "Planning Authority": "Newark Council", "Planning Application Reference": "23/00317/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.081313", "long": "-0.862764", "status": "planning", "mw": 300, "ext_id": "12893"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 300, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Staythorpe Road, Averham - Battery Storage", "name_short": "Staythorpe Road, Averham", "owner": "SSE Battery Storage Limited", "state": "east midlands", "country": "uk", "lat": "53.081313", "long": "-0.862764", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.081313+-0.862764", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coldharbour, Chickerell - Battery Storage Facility", "city": "", "id": "1116", "external_id": "12967", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "23 Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1116", "external_id": "12967", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coldharbour, Chickerell - Battery Storage Facility", "external_id": "12967", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "23 Energy", "status": "planning", "date_first_heard": "2023-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.631479", "long": "-2.492596", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12967", "Record Last Updated (dd/mm/yyyy)": "19/06/2023", "Operator (or Applicant)": "23 Energy", "Site Name": "Coldharbour, Chickerell - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Coldharbour, Chickerell, Weymouth", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT3 4BG", "X-coordinate": "365257", "Y-coordinate": "81425", "Planning Authority": "Weymouth & Portland Borough Council", "Planning Application Reference": "P/FUL/2023/02446", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.631479", "long": "-2.492596", "status": "planning", "mw": 60, "ext_id": "12967"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12967", "Record Last Updated (dd/mm/yyyy)": "19/06/2023", "Operator (or Applicant)": "23 Energy", "Site Name": "Coldharbour, Chickerell - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Coldharbour, Chickerell, Weymouth", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT3 4BG", "X-coordinate": "365257", "Y-coordinate": "81425", "Planning Authority": "Weymouth & Portland Borough Council", "Planning Application Reference": "P/FUL/2023/02446", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.631479", "long": "-2.492596", "status": "planning", "mw": 60, "ext_id": "12967"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coldharbour, Chickerell - Battery Storage Facility", "name_short": "Coldharbour, Chickerell", "owner": "23 Energy", "state": "south west", "country": "uk", "lat": "50.631479", "long": "-2.492596", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.631479+-2.492596", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drumore Cottage, Swordale - Battery Storage", "city": "", "id": "1117", "external_id": "12983", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Fig Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1117", "external_id": "12983", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drumore Cottage, Swordale - Battery Storage", "external_id": "12983", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Fig Power", "status": "planning", "date_first_heard": "2023-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.658593", "long": "-4.389942", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12983", "Record Last Updated (dd/mm/yyyy)": "07/07/2023", "Operator (or Applicant)": "Fig Power", "Site Name": "Drumore Cottage, Swordale - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Drumore Farm, Swordale, Evanton", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV16 9XA", "X-coordinate": "257503", "Y-coordinate": "865702", "Planning Authority": "Highlands Council", "Planning Application Reference": "23/02840/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.658593", "long": "-4.389942", "status": "planning", "mw": 49, "ext_id": "12983"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12983", "Record Last Updated (dd/mm/yyyy)": "07/07/2023", "Operator (or Applicant)": "Fig Power", "Site Name": "Drumore Cottage, Swordale - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Drumore Farm, Swordale, Evanton", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV16 9XA", "X-coordinate": "257503", "Y-coordinate": "865702", "Planning Authority": "Highland Council", "Planning Application Reference": "23/02840/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.658593", "long": "-4.389942", "status": "planning", "mw": 49, "ext_id": "12983"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drumore Cottage, Swordale - Battery Storage", "name_short": "Drumore Cottage, Swordale", "owner": "Fig Power", "state": "scotland", "country": "uk", "lat": "57.658593", "long": "-4.389942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.658593+-4.389942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walpole Sub Station, Walpole Bank - Battery Storage", "city": "", "id": "1118", "external_id": "13045", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Henry Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1118", "external_id": "13045", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walpole Sub Station, Walpole Bank - Battery Storage", "external_id": "13045", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Henry Energy Limited", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.724985", "long": "0.205612", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13045", "Record Last Updated (dd/mm/yyyy)": "18/01/2023", "Operator (or Applicant)": "Henry Energy Limited", "Site Name": "Walpole Sub Station, Walpole Bank - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Walpole Sub Station Walpole Bank Walpole St Andrew ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549050", "Y-coordinate": "316430", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02265/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.724985", "long": "0.205612", "status": "planning", "mw": 100, "ext_id": "13045"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13045", "Record Last Updated (dd/mm/yyyy)": "18/01/2023", "Operator (or Applicant)": "Henry Energy Limited", "Site Name": "Walpole Sub Station, Walpole Bank - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Walpole Sub Station Walpole Bank Walpole St Andrew ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549050", "Y-coordinate": "316430", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02265/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.724985", "long": "0.205612", "status": "planning", "mw": 100, "ext_id": "13045"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walpole Sub Station, Walpole Bank - Battery Storage", "name_short": "Walpole Sub Station, Walpole Bank", "owner": "Henry Energy Limited", "state": "eastern", "country": "uk", "lat": "52.724985", "long": "0.205612", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.724985+0.205612", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "city": "", "id": "1120", "external_id": "13087", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Scot Stability Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1120", "external_id": "13087", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "external_id": "13087", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Scot Stability Limited", "status": "planning", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.403505", "long": "-2.521716", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13087", "Record Last Updated (dd/mm/yyyy)": "25/05/2023", "Operator (or Applicant)": "Scot Stability Limited", "Site Name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Of Blackhills Rothienorman ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8YN ", "X-coordinate": "368749", "Y-coordinate": "834910", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0718", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.403505", "long": "-2.521716", "status": "planning", "mw": 49, "ext_id": "13087"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/05/2023", "to": "18/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13087", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "Scot Stability Limited", "Site Name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Of Blackhills Rothienorman ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8YN ", "X-coordinate": "368749", "Y-coordinate": "834910", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0718", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.403505", "long": "-2.521716", "status": "planning", "mw": 49, "ext_id": "13087"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "name_short": "Middleton Of Blackhills, Rothienorm...", "owner": "Scot Stability Limited", "state": "scotland", "country": "uk", "lat": "57.403505", "long": "-2.521716", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.403505+-2.521716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pershore Lane, Tibberton - Battery Energy Storage System", "city": "", "id": "1121", "external_id": "13096", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Sirius Renewable Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1121", "external_id": "13096", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pershore Lane, Tibberton - Battery Energy Storage System", "external_id": "13096", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 14, "power_mw": 14, "owner": "Sirius Renewable Energy", "status": "planning", "date_first_heard": "2023-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.216297", "long": "-2.153875", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13096", "Record Last Updated (dd/mm/yyyy)": "25/01/2023", "Operator (or Applicant)": "Sirius Renewable Energy", "Site Name": "Pershore Lane, Tibberton - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Pershore Lane, Tibberton, Worcester", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "WR4 0AA", "X-coordinate": "389584", "Y-coordinate": "257576", "Planning Authority": "Wychavon District Council", "Planning Application Reference": "W/22/02717/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.216297", "long": "-2.153875", "status": "planning", "mw": 14, "ext_id": "13096"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/01/2023", "to": "31/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13096", "Record Last Updated (dd/mm/yyyy)": "31/10/2023", "Operator (or Applicant)": "Sirius Renewable Energy", "Site Name": "Pershore Lane, Tibberton - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Pershore Lane, Tibberton, Worcester", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "WR4 0AA", "X-coordinate": "389584", "Y-coordinate": "257576", "Planning Authority": "Wychavon District Council", "Planning Application Reference": "W/22/02717/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.216297", "long": "-2.153875", "status": "planning", "mw": 14, "ext_id": "13096"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 14, "mwh_is_estimate": true, "mwh": 14, "mwh_estimate": 14, "status": "planning", "status_class": "", "date_first_heard": "2023-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Pershore Lane, Tibberton - Battery Energy Storage System", "name_short": "Pershore Lane, Tibberton - Battery", "owner": "Sirius Renewable Energy", "state": "west midlands", "country": "uk", "lat": "52.216297", "long": "-2.153875", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.216297+-2.153875", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordhouse Lane - Battery Energy Storage System", "city": "", "id": "1122", "external_id": "13108", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "FPC (Electric Land) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1122", "external_id": "13108", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordhouse Lane - Battery Energy Storage System", "external_id": "13108", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "FPC (Electric Land) Limited", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.424347", "long": "-1.915134", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13108", "Record Last Updated (dd/mm/yyyy)": "31/01/2023", "Operator (or Applicant)": "FPC (Electric Land) Limited", "Site Name": "Fordhouse Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "165 Fordhouse Lane, Stirchley, Birmingham ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": " B30 3AG ", "X-coordinate": "405868", "Y-coordinate": "280710", "Planning Authority": "Birmingham City Council", "Planning Application Reference": "2023/00142/PA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.424347", "long": "-1.915134", "status": "planning", "mw": 20, "ext_id": "13108"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2023", "to": "11/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13108", "Record Last Updated (dd/mm/yyyy)": "11/09/2023", "Operator (or Applicant)": "FPC (Electric Land) Limited", "Site Name": "Fordhouse Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "165 Fordhouse Lane, Stirchley, Birmingham ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": " B30 3AG ", "X-coordinate": "405868", "Y-coordinate": "280710", "Planning Authority": "Birmingham City Council", "Planning Application Reference": "2023/00142/PA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.424347", "long": "-1.915134", "status": "planning", "mw": 20, "ext_id": "13108"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordhouse Lane - Battery Energy Storage System", "name_short": "Fordhouse Lane - Battery", "owner": "FPC (Electric Land) Limited", "state": "west midlands", "country": "uk", "lat": "52.424347", "long": "-1.915134", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.424347+-1.915134", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newburgh Road, Abernethy - Energy Storage", "city": "", "id": "1123", "external_id": "13111", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "P & M Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1123", "external_id": "13111", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newburgh Road, Abernethy - Energy Storage", "external_id": "13111", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "P & M Energy Limited", "status": "planning", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.34083", "long": "-3.290693", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13111", "Record Last Updated (dd/mm/yyyy)": "04/04/2023", "Operator (or Applicant)": "P & M Energy Limited", "Site Name": "Newburgh Road, Abernethy - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "110 Metres Ne/O Abernethy Cemetery, Abernethy Cemetery, Newburgh Road, Abernethy, Perth", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH2", "X-coordinate": "320311", "Y-coordinate": "717245", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/02217/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.34083", "long": "-3.290693", "status": "planning", "mw": 15, "ext_id": "13111"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13111", "Record Last Updated (dd/mm/yyyy)": "04/04/2023", "Operator (or Applicant)": "P & M Energy Limited", "Site Name": "Newburgh Road, Abernethy - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "110 Metres Ne/O Abernethy Cemetery, Abernethy Cemetery, Newburgh Road, Abernethy, Perth", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH2", "X-coordinate": "320311", "Y-coordinate": "717245", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/02217/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.34083", "long": "-3.290693", "status": "planning", "mw": 15, "ext_id": "13111"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newburgh Road, Abernethy - Energy Storage", "name_short": "Newburgh Road, Abernethy", "owner": "P & M Energy Limited", "state": "scotland", "country": "uk", "lat": "56.34083", "long": "-3.290693", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.34083+-3.290693", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clashindarroch Wind Farm Extension", "city": "", "id": "1124", "external_id": "13117", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Infinergy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1124", "external_id": "13117", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clashindarroch Wind Farm Extension", "external_id": "13117", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Infinergy", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.372003", "long": "-2.858895", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13117", "Record Last Updated (dd/mm/yyyy)": "31/01/2023", "Operator (or Applicant)": "Infinergy", "Site Name": "Clashindarroch Wind Farm Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8004", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cabrach Estate, approximately 8km south east of Dufftown, 9km south west of Huntly, and 7.5km north west of Rhynie", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB54 4QS", "X-coordinate": "348444", "Y-coordinate": "831609", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004695", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.372003", "long": "-2.858895", "status": "planning", "mw": 50, "ext_id": "13117"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13117", "Record Last Updated (dd/mm/yyyy)": "31/01/2023", "Operator (or Applicant)": "Infinergy", "Site Name": "Clashindarroch Wind Farm Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8004", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cabrach Estate, approximately 8km south east of Dufftown, 9km south west of Huntly, and 7.5km north west of Rhynie", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB54 4QS", "X-coordinate": "348444", "Y-coordinate": "831609", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004695", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.372003", "long": "-2.858895", "status": "planning", "mw": 50, "ext_id": "13117"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clashindarroch Wind Farm Extension", "name_short": "Clashindarroch Wind Farm Extension", "owner": "Infinergy", "state": "scotland", "country": "uk", "lat": "57.372003", "long": "-2.858895", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.372003+-2.858895", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hollins Lane - Battery Energy Storage", "city": "", "id": "1125", "external_id": "13144", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1125", "external_id": "13144", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hollins Lane - Battery Energy Storage", "external_id": "13144", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "Hydrock Consultants Limited", "status": "planning", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.880797", "long": "-2.462967", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13144", "Record Last Updated (dd/mm/yyyy)": "22/05/2023", "Operator (or Applicant)": "Hydrock Consultants Limited", "Site Name": "Hollins Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Hollins Lane, Market Drayton", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "TF9 2AL", "X-coordinate": "368941", "Y-coordinate": "331582", "Planning Authority": "Shropshire City Council", "Planning Application Reference": "23/00223/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.880797", "long": "-2.462967", "status": "planning", "mw": 13, "ext_id": "13144"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13144", "Record Last Updated (dd/mm/yyyy)": "22/05/2023", "Operator (or Applicant)": "Hydrock Consultants Limited", "Site Name": "Hollins Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Hollins Lane, Market Drayton", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "TF9 2AL", "X-coordinate": "368941", "Y-coordinate": "331582", "Planning Authority": "Shropshire City Council", "Planning Application Reference": "23/00223/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.880797", "long": "-2.462967", "status": "planning", "mw": 13, "ext_id": "13144"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "planning", "status_class": "", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hollins Lane - Battery Energy Storage", "name_short": "Hollins Lane", "owner": "Hydrock Consultants Limited", "state": "west midlands", "country": "uk", "lat": "52.880797", "long": "-2.462967", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.880797+-2.462967", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Linton Court Farm, Highnam - Battery storage", "city": "", "id": "1126", "external_id": "13145", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "STOR 136 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1126", "external_id": "13145", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Linton Court Farm, Highnam - Battery storage", "external_id": "13145", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "STOR 136 Limited", "status": "planning", "date_first_heard": "2023-08-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.870201", "long": "-2.288679", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13145", "Record Last Updated (dd/mm/yyyy)": "02/02/2023", "Operator (or Applicant)": "STOR 136 Limited", "Site Name": "Linton Court Farm, Highnam - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Linton Court Farm, Highnam", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 8DF", "X-coordinate": "380221", "Y-coordinate": "219109", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "22/01374/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.870201", "long": "-2.288679", "status": "planning", "mw": 99, "ext_id": "13145"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/02/2023", "to": "08/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13145", "Record Last Updated (dd/mm/yyyy)": "08/09/2023", "Operator (or Applicant)": "STOR 136 Limited", "Site Name": "Linton Court Farm, Highnam - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Linton Court Farm, Highnam", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 8DF", "X-coordinate": "380221", "Y-coordinate": "219109", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "22/01374/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.870201", "long": "-2.288679", "status": "planning", "mw": 99, "ext_id": "13145"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-08-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Linton Court Farm, Highnam - Battery storage", "name_short": "Linton Court Farm, Highnam", "owner": "STOR 136 Limited", "state": "south west", "country": "uk", "lat": "51.870201", "long": "-2.288679", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.870201+-2.288679", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "city": "", "id": "1127", "external_id": "13225", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "43", "power_mw": "43", "customer": "", "owner": "Falkirk Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1127", "external_id": "13225", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "external_id": "13225", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 43, "power_mw": 43, "owner": "Falkirk Power Limited", "status": "planning", "date_first_heard": "2023-06-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.013724", "long": "-3.782254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13225", "Record Last Updated (dd/mm/yyyy)": "04/07/2023", "Operator (or Applicant)": "Falkirk Power Limited", "Site Name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "43", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " The South East Of Merchiston Industrial Estate Smith Street", "County": "Central", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK2 7PD", "X-coordinate": "288986", "Y-coordinate": "681522", "Planning Authority": "Falkirk Council", "Planning Application Reference": "P/23/0046/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.013724", "long": "-3.782254", "status": "planning", "mw": 43, "ext_id": "13225"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "County", "from": "Central", "to": "Falkirk", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13225", "Record Last Updated (dd/mm/yyyy)": "04/07/2023", "Operator (or Applicant)": "Falkirk Power Limited", "Site Name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "43", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " The South East Of Merchiston Industrial Estate Smith Street", "County": "Falkirk", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK2 7PD", "X-coordinate": "288986", "Y-coordinate": "681522", "Planning Authority": "Falkirk Council", "Planning Application Reference": "P/23/0046/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.013724", "long": "-3.782254", "status": "planning", "mw": 43, "ext_id": "13225"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 43, "mwh_is_estimate": true, "mwh": 43, "mwh_estimate": 43, "status": "planning", "status_class": "", "date_first_heard": "2023-06-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "name_short": "Merchiston Industrial Estate, Smith...", "owner": "Falkirk Power Limited", "state": "scotland", "country": "uk", "lat": "56.013724", "long": "-3.782254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.013724+-3.782254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "city": "", "id": "1128", "external_id": "13236", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1128", "external_id": "13236", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "external_id": "13236", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Energy Storage Limited", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.26313", "long": "-3.942529", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13236", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Shindour, Feddal Hill, Wood Braco, Dunblane", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK15 9RA", "X-coordinate": "279777", "Y-coordinate": "709545", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/02231/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.26313", "long": "-3.942529", "status": "planning", "mw": 49, "ext_id": "13236"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13236", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Shindour, Feddal Hill, Wood Braco, Dunblane", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK15 9RA", "X-coordinate": "279777", "Y-coordinate": "709545", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/02231/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.26313", "long": "-3.942529", "status": "planning", "mw": 49, "ext_id": "13236"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "name_short": "Shindour, Feddal Hill Wood - Batter...", "owner": "Whirlwind Energy Storage Limited", "state": "scotland", "country": "uk", "lat": "56.26313", "long": "-3.942529", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.26313+-3.942529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Quantans Hill Wind Farm", "city": "", "id": "1129", "external_id": "13238", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vattenfall Wind Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1129", "external_id": "13238", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Quantans Hill Wind Farm", "external_id": "13238", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Vattenfall Wind Power Limited", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.212545", "long": "-4.262613", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13238", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Vattenfall Wind Power Limited", "Site Name": "Quantans Hill Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13237", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Quantans Hill Wind Farm, Carsphairn, Castle Douglas", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG7 3TQ", "X-coordinate": "256137", "Y-coordinate": "593258", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003399", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.212545", "long": "-4.262613", "status": "planning", "mw": 50, "ext_id": "13238"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13238", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Vattenfall Wind Power Limited", "Site Name": "Quantans Hill Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13237", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Quantans Hill Wind Farm, Carsphairn, Castle Douglas", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG7 3TQ", "X-coordinate": "256137", "Y-coordinate": "593258", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003399", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.212545", "long": "-4.262613", "status": "planning", "mw": 50, "ext_id": "13238"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Quantans Hill Wind Farm", "name_short": "Quantans Hill Wind Farm", "owner": "Vattenfall Wind Power Limited", "state": "scotland", "country": "uk", "lat": "55.212545", "long": "-4.262613", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.212545+-4.262613", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "city": "", "id": "1130", "external_id": "13246", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Reliance Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1130", "external_id": "13246", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "external_id": "13246", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Reliance Energy Limited", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.69977", "long": "-1.301359", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13246", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Reliance Energy Limited", "Site Name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North East Corner Whelly Hill Farm\n", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS27 3BH", "X-coordinate": "445123", "Y-coordinate": "534084", "Planning Authority": "Hartlepool Council", "Planning Application Reference": "H/2022/0459\t", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.69977", "long": "-1.301359", "status": "planning", "mw": 50, "ext_id": "13246"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/02/2023", "to": "02/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Hartlepool Council", "to": "Hartlepool Borough Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13246", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Reliance Energy Limited", "Site Name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North East Corner Whelly Hill Farm\n", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS27 3BH", "X-coordinate": "445123", "Y-coordinate": "534084", "Planning Authority": "Hartlepool Borough Council", "Planning Application Reference": "H/2022/0459\t", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.69977", "long": "-1.301359", "status": "planning", "mw": 50, "ext_id": "13246"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "name_short": "Whelley Hill Farm, Worset Lane", "owner": "Reliance Energy Limited", "state": "north east", "country": "uk", "lat": "54.69977", "long": "-1.301359", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.69977+-1.301359", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peel Road, Westby With Plumptons - Battery Storage", "city": "", "id": "1132", "external_id": "13300", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1132", "external_id": "13300", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Peel Road, Westby With Plumptons - Battery Storage", "external_id": "13300", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Energi Generation", "status": "planning", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.783376", "long": "-2.977465", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13300", "Record Last Updated (dd/mm/yyyy)": "24/02/2023", "Operator (or Applicant)": "Energi Generation", "Site Name": "Peel Road, Westby With Plumptons - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Peel Road, Opp Sub Station, Westby With Plumptons, Blackpool", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "FY4 5JU", "X-coordinate": "335692", "Y-coordinate": "432338", "Planning Authority": "Fylde Council", "Planning Application Reference": "23/0125", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.783376", "long": "-2.977465", "status": "planning", "mw": 20, "ext_id": "13300"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2023", "to": "25/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13300", "Record Last Updated (dd/mm/yyyy)": "25/09/2023", "Operator (or Applicant)": "Energi Generation", "Site Name": "Peel Road, Westby With Plumptons - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Peel Road, Opp Sub Station, Westby With Plumptons, Blackpool", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "FY4 5JU", "X-coordinate": "335692", "Y-coordinate": "432338", "Planning Authority": "Fylde Council", "Planning Application Reference": "23/0125", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.783376", "long": "-2.977465", "status": "planning", "mw": 20, "ext_id": "13300"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Peel Road, Westby With Plumptons - Battery Storage", "name_short": "Peel Road, Westby With Plumptons", "owner": "Energi Generation", "state": "north west", "country": "uk", "lat": "53.783376", "long": "-2.977465", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.783376+-2.977465", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fairways Business Park - Battery Storage ", "city": "", "id": "1133", "external_id": "13318", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1133", "external_id": "13318", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fairways Business Park - Battery Storage ", "external_id": "13318", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Intelligent Land Investments Group Plc", "status": "planning", "date_first_heard": "2023-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.453909", "long": "-4.211182", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13318", "Record Last Updated (dd/mm/yyyy)": "02/03/2023", "Operator (or Applicant)": "Intelligent Land Investments Group Plc", "Site Name": "Fairways Business Park - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fairways Business Park", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV2 6AA", "X-coordinate": "267424", "Y-coordinate": "842560", "Planning Authority": "Highlands Council", "Planning Application Reference": "23/00497/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.453909", "long": "-4.211182", "status": "planning", "mw": 50, "ext_id": "13318"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13318", "Record Last Updated (dd/mm/yyyy)": "02/03/2023", "Operator (or Applicant)": "Intelligent Land Investments Group Plc", "Site Name": "Fairways Business Park - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fairways Business Park", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV2 6AA", "X-coordinate": "267424", "Y-coordinate": "842560", "Planning Authority": "Highland Council", "Planning Application Reference": "23/00497/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.453909", "long": "-4.211182", "status": "planning", "mw": 50, "ext_id": "13318"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fairways Business Park - Battery Storage ", "name_short": "Fairways Business Park - Battery St...", "owner": "Intelligent Land Investments Group Plc", "state": "scotland", "country": "uk", "lat": "57.453909", "long": "-4.211182", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.453909+-4.211182", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carrington Power Station, Manchester Road - Battery Storage", "city": "", "id": "1134", "external_id": "13362", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1040", "power_mw": "1040", "customer": "", "owner": "Wainstones Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1134", "external_id": "13362", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Carrington Power Station, Manchester Road - Battery Storage", "external_id": "13362", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 1040, "power_mw": 1040, "owner": "Wainstones Energy Limited", "status": "planning", "date_first_heard": "2023-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.433433", "long": "-2.403539", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13362", "Record Last Updated (dd/mm/yyyy)": "06/03/2023", "Operator (or Applicant)": "Wainstones Energy Limited", "Site Name": "Carrington Power Station, Manchester Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1040", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrington Power Station, Manchester Road", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M31 4AY", "X-coordinate": "373287", "Y-coordinate": "393037", "Planning Authority": "Trafford Council", "Planning Application Reference": "110320/FUL/23", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.433433", "long": "-2.403539", "status": "planning", "mw": 1040, "ext_id": "13362"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13362", "Record Last Updated (dd/mm/yyyy)": "06/03/2023", "Operator (or Applicant)": "Wainstones Energy Limited", "Site Name": "Carrington Power Station, Manchester Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1040", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrington Power Station, Manchester Road", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M31 4AY", "X-coordinate": "373287", "Y-coordinate": "393037", "Planning Authority": "Trafford Council", "Planning Application Reference": "110320/FUL/23", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.433433", "long": "-2.403539", "status": "planning", "mw": 1040, "ext_id": "13362"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1040, "mwh_is_estimate": true, "mwh": 1040, "mwh_estimate": 1040, "status": "planning", "status_class": "", "date_first_heard": "2023-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Carrington Power Station, Manchester Road - Battery Storage", "name_short": "Carrington Power Station, Mancheste...", "owner": "Wainstones Energy Limited", "state": "north west", "country": "uk", "lat": "53.433433", "long": "-2.403539", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.433433+-2.403539", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lichfield Road, Watton Lane - Battery Storage", "city": "", "id": "1135", "external_id": "13369", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo ES Water Orton Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1135", "external_id": "13369", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lichfield Road, Watton Lane - Battery Storage", "external_id": "13369", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anglo ES Water Orton Limited", "status": "planning", "date_first_heard": "2023-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.516318", "long": "-1.730976", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13369", "Record Last Updated (dd/mm/yyyy)": "09/03/2023", "Operator (or Applicant)": "Anglo ES Water Orton Limited", "Site Name": "Lichfield Road, Watton Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Junction Lichfield Road Watton Lane Water Orton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B46 1PH", "X-coordinate": "418353", "Y-coordinate": "290971", "Planning Authority": "North Warwickshire Council", "Planning Application Reference": "PAP/2023/0056", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.516318", "long": "-1.730976", "status": "planning", "mw": 49, "ext_id": "13369"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13369", "Record Last Updated (dd/mm/yyyy)": "09/03/2023", "Operator (or Applicant)": "Anglo ES Water Orton Limited", "Site Name": "Lichfield Road, Watton Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Junction Lichfield Road Watton Lane Water Orton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B46 1PH", "X-coordinate": "418353", "Y-coordinate": "290971", "Planning Authority": "North Warwickshire Council", "Planning Application Reference": "PAP/2023/0056", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.516318", "long": "-1.730976", "status": "planning", "mw": 49, "ext_id": "13369"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lichfield Road, Watton Lane - Battery Storage", "name_short": "Lichfield Road, Watton Lane", "owner": "Anglo ES Water Orton Limited", "state": "west midlands", "country": "uk", "lat": "52.516318", "long": "-1.730976", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.516318+-1.730976", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hollydale, Buildwas Road - Battery Storage", "city": "", "id": "1136", "external_id": "13410", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Telford Four Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1136", "external_id": "13410", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hollydale, Buildwas Road - Battery Storage", "external_id": "13410", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Telford Four Limited", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.637953", "long": "-2.519033", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13410", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "Telford Four Limited", "Site Name": "Hollydale, Buildwas Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "adjacent Hollydale, Buildwas Road, Ironbridge", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "TF8 7BN", "X-coordinate": "364973", "Y-coordinate": "304594", "Planning Authority": "Telford & Wrekin Council", "Planning Application Reference": "TWC/2023/0144", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.637953", "long": "-2.519033", "status": "planning", "mw": 40, "ext_id": "13410"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13410", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "Telford Four Limited", "Site Name": "Hollydale, Buildwas Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "adjacent Hollydale, Buildwas Road, Ironbridge", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "TF8 7BN", "X-coordinate": "364973", "Y-coordinate": "304594", "Planning Authority": "Telford & Wrekin Council", "Planning Application Reference": "TWC/2023/0144", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.637953", "long": "-2.519033", "status": "planning", "mw": 40, "ext_id": "13410"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hollydale, Buildwas Road - Battery Storage", "name_short": "Hollydale, Buildwas Road", "owner": "Telford Four Limited", "state": "west midlands", "country": "uk", "lat": "52.637953", "long": "-2.519033", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.637953+-2.519033", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "city": "", "id": "1138", "external_id": "13461", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Conrad Energy ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1138", "external_id": "13461", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "external_id": "13461", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Conrad Energy ", "status": "planning", "date_first_heard": "2023-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.447352", "long": "-4.242063", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13461", "Record Last Updated (dd/mm/yyyy)": "20/03/2023", "Operator (or Applicant)": "Conrad Energy ", "Site Name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Landulph Substation, Ellbridge Lane, Landulph, Saltash", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6NB", "X-coordinate": "240913", "Y-coordinate": "63237", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/01323", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447352", "long": "-4.242063", "status": "planning", "mw": 49, "ext_id": "13461"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/03/2023", "to": "11/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "05/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13461", "Record Last Updated (dd/mm/yyyy)": "11/09/2023", "Operator (or Applicant)": "Conrad Energy ", "Site Name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Landulph Substation, Ellbridge Lane, Landulph, Saltash", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6NB", "X-coordinate": "240913", "Y-coordinate": "63237", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/01323", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447352", "long": "-4.242063", "status": "planning", "mw": 49, "ext_id": "13461"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "name_short": "Landulph Substation, Ellbridge Lane", "owner": "Conrad Energy ", "state": "south west", "country": "uk", "lat": "50.447352", "long": "-4.242063", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.447352+-4.242063", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kemsley Energy Park Battery Storage", "city": "", "id": "1140", "external_id": "13489", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "120", "customer": "", "owner": "FPC Electric Land limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1140", "external_id": "13489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kemsley Energy Park Battery Storage", "external_id": "13489", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 120, "power_mw": 120, "owner": "FPC Electric Land limited", "status": "planning", "date_first_heard": "2023-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.36675", "long": "0.744796", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13489", "Record Last Updated (dd/mm/yyyy)": "22/03/2023", "Operator (or Applicant)": "FPC Electric Land limited", "Site Name": "Kemsley Energy Park Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "120", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The West Of Barge Way", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME10 2FE", "X-coordinate": "591165", "Y-coordinate": "166652", "Planning Authority": "Swale Council", "Planning Application Reference": "23/500771/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.36675", "long": "0.744796", "status": "planning", "mw": 120, "ext_id": "13489"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13489", "Record Last Updated (dd/mm/yyyy)": "22/03/2023", "Operator (or Applicant)": "FPC Electric Land limited", "Site Name": "Kemsley Energy Park Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "120", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The West Of Barge Way", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME10 2FE", "X-coordinate": "591165", "Y-coordinate": "166652", "Planning Authority": "Swale Council", "Planning Application Reference": "23/500771/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.36675", "long": "0.744796", "status": "planning", "mw": 120, "ext_id": "13489"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 120, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "planning", "status_class": "", "date_first_heard": "2023-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kemsley Energy Park Battery Storage", "name_short": "Kemsley Energy Park", "owner": "FPC Electric Land limited", "state": "south east", "country": "uk", "lat": "51.36675", "long": "0.744796", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.36675+0.744796", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "city": "", "id": "1141", "external_id": "13550", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1141", "external_id": "13550", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "external_id": "13550", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Novus Renewable Services", "status": "planning", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.839715", "long": "-1.962978", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13550", "Record Last Updated (dd/mm/yyyy)": "30/03/2023", "Operator (or Applicant)": "Novus Renewable Services", "Site Name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13549", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Farm Drointon Lane Grindley", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST18 0LX", "X-coordinate": "402591", "Y-coordinate": "326912", "Planning Authority": "Stafford Council", "Planning Application Reference": "23/36938/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.839715", "long": "-1.962978", "status": "planning", "mw": 30, "ext_id": "13550"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13550", "Record Last Updated (dd/mm/yyyy)": "30/03/2023", "Operator (or Applicant)": "Novus Renewable Services", "Site Name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13549", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Farm Drointon Lane Grindley", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST18 0LX", "X-coordinate": "402591", "Y-coordinate": "326912", "Planning Authority": "Stafford Council", "Planning Application Reference": "23/36938/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.839715", "long": "-1.962978", "status": "planning", "mw": 30, "ext_id": "13550"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "name_short": "Lower Farm, Drointon Lane - Solar f...", "owner": "Novus Renewable Services", "state": "west midlands", "country": "uk", "lat": "52.839715", "long": "-1.962978", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.839715+-1.962978", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hickling Lane, Swainsthorpe -Battery Storage", "city": "", "id": "1142", "external_id": "13560", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "114", "power_mw": "114", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1142", "external_id": "13560", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hickling Lane, Swainsthorpe -Battery Storage", "external_id": "13560", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 114, "power_mw": 114, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2023-09-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.57348", "long": "1.275689", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13560", "Record Last Updated (dd/mm/yyyy)": "03/04/2023", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Hickling Lane, Swainsthorpe -Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "114", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "\nLand North Of Hickling Lane Swainsthorpe\ufffd", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8PW", "X-coordinate": "622065", "Y-coordinate": "302336", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2023/0617", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.57348", "long": "1.275689", "status": "planning", "mw": 114, "ext_id": "13560"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/04/2023", "to": "18/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13560", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Hickling Lane, Swainsthorpe -Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "114", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "\nLand North Of Hickling Lane Swainsthorpe\ufffd", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8PW", "X-coordinate": "622065", "Y-coordinate": "302336", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2023/0617", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.57348", "long": "1.275689", "status": "planning", "mw": 114, "ext_id": "13560"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 114, "mwh_is_estimate": true, "mwh": 114, "mwh_estimate": 114, "status": "planning", "status_class": "", "date_first_heard": "2023-09-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hickling Lane, Swainsthorpe -Battery Storage", "name_short": "Hickling Lane, Swainsthorpe", "owner": "EDF Energy Renewables", "state": "eastern", "country": "uk", "lat": "52.57348", "long": "1.275689", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.57348+1.275689", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Spennymoor Greener Grid Park", "city": "", "id": "1143", "external_id": "13576", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1143", "external_id": "13576", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Spennymoor Greener Grid Park", "external_id": "13576", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Statkraft UK Limited", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.708471", "long": "-1.538544", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13576", "Record Last Updated (dd/mm/yyyy)": "03/04/2023", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Spennymoor Greener Grid Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Spennymoor, National Grid Station, Thinford Lane, Thinford, Durham", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 5LB", "X-coordinate": "429831", "Y-coordinate": "534926", "Planning Authority": "Durham Council", "Planning Application Reference": "DM/23/00745/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.708471", "long": "-1.538544", "status": "planning", "mw": 200, "ext_id": "13576"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13576", "Record Last Updated (dd/mm/yyyy)": "03/04/2023", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Spennymoor Greener Grid Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Spennymoor, National Grid Station, Thinford Lane, Thinford, Durham", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 5LB", "X-coordinate": "429831", "Y-coordinate": "534926", "Planning Authority": "Durham Council", "Planning Application Reference": "DM/23/00745/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.708471", "long": "-1.538544", "status": "planning", "mw": 200, "ext_id": "13576"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Spennymoor Greener Grid Park", "name_short": "Spennymoor Greener Grid Park", "owner": "Statkraft UK Limited", "state": "north east", "country": "uk", "lat": "54.708471", "long": "-1.538544", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.708471+-1.538544", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "city": "", "id": "1144", "external_id": "13607", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1144", "external_id": "13607", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "external_id": "13607", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Immersa Limited", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.505207", "long": "-2.442992", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13607", "Record Last Updated (dd/mm/yyyy)": "11/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Off Westerleigh Hill Westerleigh", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 8RD", "X-coordinate": "369350", "Y-coordinate": "178568", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/01180/F ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.505207", "long": "-2.442992", "status": "planning", "mw": 200, "ext_id": "13607"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13607", "Record Last Updated (dd/mm/yyyy)": "11/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Off Westerleigh Hill Westerleigh", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 8RD", "X-coordinate": "369350", "Y-coordinate": "178568", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/01180/F ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.505207", "long": "-2.442992", "status": "planning", "mw": 200, "ext_id": "13607"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "name_short": "Westerleigh Hill, Westerleigh - Bat...", "owner": "Immersa Limited", "state": "south west", "country": "uk", "lat": "51.505207", "long": "-2.442992", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.505207+-2.442992", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walpole Bank - Battery Energy Storage Facility", "city": "", "id": "1146", "external_id": "13639", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Field Devco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1146", "external_id": "13639", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walpole Bank - Battery Energy Storage Facility", "external_id": "13639", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Field Devco Limited", "status": "planning", "date_first_heard": "2023-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.722965", "long": "0.210708", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13639", "Record Last Updated (dd/mm/yyyy)": "12/04/2023", "Operator (or Applicant)": "Field Devco Limited", "Site Name": "Walpole Bank - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opp Walpole Sub Station, Walpole Bank, Walpole, Wisbech", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549401", "Y-coordinate": "316216", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02021/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.722965", "long": "0.210708", "status": "planning", "mw": 100, "ext_id": "13639"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13639", "Record Last Updated (dd/mm/yyyy)": "12/04/2023", "Operator (or Applicant)": "Field Devco Limited", "Site Name": "Walpole Bank - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opp Walpole Sub Station, Walpole Bank, Walpole, Wisbech", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549401", "Y-coordinate": "316216", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02021/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.722965", "long": "0.210708", "status": "planning", "mw": 100, "ext_id": "13639"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walpole Bank - Battery Energy Storage Facility", "name_short": "Walpole Bank - Battery Energy", "owner": "Field Devco Limited", "state": "eastern", "country": "uk", "lat": "52.722965", "long": "0.210708", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.722965+0.210708", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "city": "", "id": "1147", "external_id": "13643", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1147", "external_id": "13643", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "external_id": "13643", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Immersa Limited", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.563974", "long": "-2.509709", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13643", "Record Last Updated (dd/mm/yyyy)": "13/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Earthcott Green Farm, Earthcott Green, Alveston, Bristol", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS35 3TD", "X-coordinate": "364765", "Y-coordinate": "185134", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/01244/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.563974", "long": "-2.509709", "status": "planning", "mw": 200, "ext_id": "13643"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13643", "Record Last Updated (dd/mm/yyyy)": "13/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Earthcott Green Farm, Earthcott Green, Alveston, Bristol", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS35 3TD", "X-coordinate": "364765", "Y-coordinate": "185134", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/01244/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.563974", "long": "-2.509709", "status": "planning", "mw": 200, "ext_id": "13643"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "name_short": "Earthcott Green Farm, Earthcott Gre...", "owner": "Immersa Limited", "state": "south west", "country": "uk", "lat": "51.563974", "long": "-2.509709", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.563974+-2.509709", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "city": "", "id": "1148", "external_id": "13644", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1400", "power_mw": "1400", "customer": "", "owner": "Banks Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1148", "external_id": "13644", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "external_id": "13644", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 1400, "power_mw": 1400, "owner": "West Burton Energy / Banks Group", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.580257", "long": "-1.085062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13644", "Record Last Updated (dd/mm/yyyy)": "13/04/2023", "Operator (or Applicant)": "Banks Renewables Limited", "Site Name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1400", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thorpe Marsh Power Station, Marsh Lane, Barnby Dun, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN3 1ET", "X-coordinate": "460674", "Y-coordinate": "409685", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/00537/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.580257", "long": "-1.085062", "status": "planning", "mw": 1400, "ext_id": "13644"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/04/2023", "to": "12/10/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Banks Renewables Limited", "to": "West Burton Energy / Banks Group", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13644", "Record Last Updated (dd/mm/yyyy)": "12/10/2023", "Operator (or Applicant)": "West Burton Energy / Banks Group", "Site Name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thorpe Marsh Power Station, Marsh Lane, Barnby Dun, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN3 1ET", "X-coordinate": "460674", "Y-coordinate": "409685", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/00537/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.580257", "long": "-1.085062", "status": "planning", "mw": 1400, "ext_id": "13644"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1400, "mwh_is_estimate": true, "mwh": 1400, "mwh_estimate": 1400, "status": "planning", "status_class": "", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "name_short": "Thorpe Marsh Power Station, Marsh L...", "owner": "West Burton Energy / Banks Group", "state": "yorkshire and humber", "country": "uk", "lat": "53.580257", "long": "-1.085062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.580257+-1.085062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "city": "", "id": "1149", "external_id": "13655", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "GAM Capital Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1149", "external_id": "13655", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "external_id": "13655", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "GAM Capital Limited", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.765711", "long": "-0.231527", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13655", "Record Last Updated (dd/mm/yyyy)": "14/04/2023", "Operator (or Applicant)": "GAM Capital Limited", "Site Name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13655", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South & W/O Froghall Farm, Wyton Road, Preston, Hull", "County": "Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU12 8TY", "X-coordinate": "516668", "Y-coordinate": "431380", "Planning Authority": "East Ridings of Yorkshire Council", "Planning Application Reference": "23/00760/STPLFE", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.765711", "long": "-0.231527", "status": "planning", "mw": 20, "ext_id": "13655"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13655", "Record Last Updated (dd/mm/yyyy)": "14/04/2023", "Operator (or Applicant)": "GAM Capital Limited", "Site Name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13655", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South & W/O Froghall Farm, Wyton Road, Preston, Hull", "County": "Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU12 8TY", "X-coordinate": "516668", "Y-coordinate": "431380", "Planning Authority": "East Ridings of Yorkshire Council", "Planning Application Reference": "23/00760/STPLFE", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.765711", "long": "-0.231527", "status": "planning", "mw": 20, "ext_id": "13655"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "name_short": "Froghall Farm, Wyton Road - Solar F...", "owner": "GAM Capital Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.765711", "long": "-0.231527", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.765711+-0.231527", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Astwood Lane, Feckenham - Battery Storage", "city": "", "id": "1150", "external_id": "13707", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1150", "external_id": "13707", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Astwood Lane, Feckenham - Battery Storage", "external_id": "13707", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Immersa Limited", "status": "planning", "date_first_heard": "2023-04-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.253625", "long": "-1.980736", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13707", "Record Last Updated (dd/mm/yyyy)": "24/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Astwood Lane, Feckenham - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Astwood Lane, Feckenham, Redditch", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "B96 6HP", "X-coordinate": "401412", "Y-coordinate": "261717", "Planning Authority": "Bromsgrove District Council", "Planning Application Reference": "23/00417/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.253625", "long": "-1.980736", "status": "planning", "mw": 200, "ext_id": "13707"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13707", "Record Last Updated (dd/mm/yyyy)": "24/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Astwood Lane, Feckenham - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Astwood Lane, Feckenham, Redditch", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "B96 6HP", "X-coordinate": "401412", "Y-coordinate": "261717", "Planning Authority": "Bromsgrove District Council", "Planning Application Reference": "23/00417/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.253625", "long": "-1.980736", "status": "planning", "mw": 200, "ext_id": "13707"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Astwood Lane, Feckenham - Battery Storage", "name_short": "Astwood Lane, Feckenham", "owner": "Immersa Limited", "state": "west midlands", "country": "uk", "lat": "52.253625", "long": "-1.980736", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.253625+-1.980736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coxmoor Wood, Crondall Road - Battery Storage", "city": "", "id": "1151", "external_id": "13728", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Fleet Green Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1151", "external_id": "13728", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coxmoor Wood, Crondall Road - Battery Storage", "external_id": "13728", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Fleet Green Limited", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.261207", "long": "-0.866107", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "13728", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Fleet Green Limited", "Site Name": "Coxmoor Wood, Crondall Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "57", "Share Community Scheme": " ", "CHP Enabled": "No", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "CfD Allocation Round": "", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "North of Coxmoor Wood, off Crondall Road, Crookham Village", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU51 5SU", "X-coordinate": "479215", "Y-coordinate": "151949", "Planning Authority": "Hart District Council", "Planning Application Reference": "23/00823/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "05/04/2023", "Planning Application Withdrawn": " ", "Planning Permission Refused": " ", "Appeal Lodged": " ", "Appeal Withdrawn": " ", "Appeal Refused": " ", "Appeal Granted": " ", "Planning Permission Granted": " ", "Secretary of State - Intervened": " ", "Secretary of State - Refusal": " ", "Secretary of State - Granted": " ", "Planning Permission Expired": " ", "Under Construction": " ", "Operational": " ", "Heat Network Ref": "", "lat": "51.261207", "long": "-0.866107", "status": "planning", "mw": 57, "ext_id": "13728"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Planning Application Withdrawn", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Refused", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Lodged", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Withdrawn", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Refused", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Granted", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Intervened", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Refusal", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Granted", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": " ", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": " ", "Ref ID": "13728", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Fleet Green Limited", "Site Name": "Coxmoor Wood, Crondall Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "57", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "North of Coxmoor Wood, off Crondall Road, Crookham Village", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU51 5SU", "X-coordinate": "479215", "Y-coordinate": "151949", "Planning Authority": "Hart District Council", "Planning Application Reference": "23/00823/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "05/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.261207", "long": "-0.866107", "status": "planning", "mw": 57, "ext_id": "13728"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coxmoor Wood, Crondall Road - Battery Storage", "name_short": "Coxmoor Wood, Crondall Road", "owner": "Fleet Green Limited", "state": "south east", "country": "uk", "lat": "51.261207", "long": "-0.866107", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.261207+-0.866107", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sale Golf Club, Golf Road - Battery Storage", "city": "", "id": "1152", "external_id": "13731", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "247 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1152", "external_id": "13731", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sale Golf Club, Golf Road - Battery Storage", "external_id": "13731", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "247 Power Limited", "status": "planning", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.423748", "long": "-2.29036", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13731", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "247 Power Limited", "Site Name": "Sale Golf Club, Golf Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sale Golf Club Golf Road ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "M33 2XU", "X-coordinate": "380802", "Y-coordinate": "391923", "Planning Authority": "Trafford Council", "Planning Application Reference": "110666/FUL/23", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.423748", "long": "-2.29036", "status": "planning", "mw": 70, "ext_id": "13731"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/04/2023", "to": "30/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/11/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13731", "Record Last Updated (dd/mm/yyyy)": "30/11/2023", "Operator (or Applicant)": "247 Power Limited", "Site Name": "Sale Golf Club, Golf Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sale Golf Club Golf Road ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "M33 2XU", "X-coordinate": "380802", "Y-coordinate": "391923", "Planning Authority": "Trafford Council", "Planning Application Reference": "110666/FUL/23", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.423748", "long": "-2.29036", "status": "planning", "mw": 70, "ext_id": "13731"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sale Golf Club, Golf Road - Battery Storage", "name_short": "Sale Golf Club, Golf Road", "owner": "247 Power Limited", "state": "north west", "country": "uk", "lat": "53.423748", "long": "-2.29036", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.423748+-2.29036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tofts Lane, Hunshelf - Battery Storage", "city": "", "id": "1153", "external_id": "13733", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Harmony HS (JV) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1153", "external_id": "13733", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tofts Lane, Hunshelf - Battery Storage", "external_id": "13733", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Harmony HS (JV) Limited", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.500424", "long": "-1.601386", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13733", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Harmony HS (JV) Limited", "Site Name": "Tofts Lane, Hunshelf - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Tofts Lane, Hunshelf", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S36 8YR", "X-coordinate": "426539", "Y-coordinate": "400488", "Planning Authority": "Barnsley Metropolitan Borough Council", "Planning Application Reference": "2023/0322", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.500424", "long": "-1.601386", "status": "planning", "mw": 40, "ext_id": "13733"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/04/2023", "to": "17/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/11/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13733", "Record Last Updated (dd/mm/yyyy)": "17/11/2023", "Operator (or Applicant)": "Harmony HS (JV) Limited", "Site Name": "Tofts Lane, Hunshelf - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Tofts Lane, Hunshelf", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S36 8YR", "X-coordinate": "426539", "Y-coordinate": "400488", "Planning Authority": "Barnsley Metropolitan Borough Council", "Planning Application Reference": "2023/0322", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/11/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.500424", "long": "-1.601386", "status": "planning", "mw": 40, "ext_id": "13733"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tofts Lane, Hunshelf - Battery Storage", "name_short": "Tofts Lane, Hunshelf", "owner": "Harmony HS (JV) Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.500424", "long": "-1.601386", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.500424+-1.601386", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Welkin Road, Bredbury - Battery Storage System", "city": "", "id": "1154", "external_id": "13740", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1154", "external_id": "13740", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Welkin Road, Bredbury - Battery Storage System", "external_id": "13740", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Arlington Energy Limited", "status": "planning", "date_first_heard": "2021-12-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.416006", "long": "-2.136032", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13740", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Arlington Energy Limited", "Site Name": "Welkin Road, Bredbury - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8275", "Address": "Welkin Road", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391056", "Y-coordinate": "391031", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/078965", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.416006", "long": "-2.136032", "status": "planning", "mw": 20, "ext_id": "13740"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13740", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Arlington Energy Limited", "Site Name": "Welkin Road, Bredbury - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8275", "Address": "Welkin Road", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391056", "Y-coordinate": "391031", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/078965", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.416006", "long": "-2.136032", "status": "planning", "mw": 20, "ext_id": "13740"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-12-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Welkin Road, Bredbury - Battery Storage System", "name_short": "Welkin Road, Bredbury - Battery Sto...", "owner": "Arlington Energy Limited", "state": "north west", "country": "uk", "lat": "53.416006", "long": "-2.136032", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.416006+-2.136032", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fair Park Solar Farm", "city": "", "id": "1155", "external_id": "13761", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Downing Renewable Developments Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1155", "external_id": "13761", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fair Park Solar Farm", "external_id": "13761", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Downing Renewable Developments Llp", "status": "planning", "date_first_heard": "2023-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.337819", "long": "-5.007323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "13761", "Record Last Updated (dd/mm/yyyy)": "27/04/2023", "Operator (or Applicant)": "Downing Renewable Developments Llp", "Site Name": "Fair Park Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13760", "Installed Capacity (MWelec)": "20", "Share Community Scheme": " ", "CHP Enabled": "No", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "CfD Allocation Round": "", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Adj Trewaters Bungalow, S/O Carland Cross, Trispen, Newquay", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "TR8 5BB", "X-coordinate": "186096", "Y-coordinate": "52981", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/02629", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "17/04/2023", "Planning Application Withdrawn": " ", "Planning Permission Refused": " ", "Appeal Lodged": " ", "Appeal Withdrawn": " ", "Appeal Refused": " ", "Appeal Granted": " ", "Planning Permission Granted": " ", "Secretary of State - Intervened": " ", "Secretary of State - Refusal": " ", "Secretary of State - Granted": " ", "Planning Permission Expired": " ", "Under Construction": " ", "Operational": " ", "Heat Network Ref": "", "lat": "50.337819", "long": "-5.007323", "status": "planning", "mw": 20, "ext_id": "13761"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Planning Application Withdrawn", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Refused", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Lodged", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Withdrawn", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Refused", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Granted", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Intervened", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Refusal", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Granted", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": " ", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": " ", "Ref ID": "13761", "Record Last Updated (dd/mm/yyyy)": "27/04/2023", "Operator (or Applicant)": "Downing Renewable Developments Llp", "Site Name": "Fair Park Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13760", "Installed Capacity (MWelec)": "20", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Adj Trewaters Bungalow, S/O Carland Cross, Trispen, Newquay", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "TR8 5BB", "X-coordinate": "186096", "Y-coordinate": "52981", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/02629", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "17/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.337819", "long": "-5.007323", "status": "planning", "mw": 20, "ext_id": "13761"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fair Park Solar Farm", "name_short": "Fair Park Solar Farm", "owner": "Downing Renewable Developments Llp", "state": "south west", "country": "uk", "lat": "50.337819", "long": "-5.007323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.337819+-5.007323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "city": "", "id": "1156", "external_id": "13774", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Conrad Energy (Developments) Ii Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1156", "external_id": "13774", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "external_id": "13774", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Conrad Energy (Developments) Ii Limited", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.435899", "long": "-1.356632", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13774", "Record Last Updated (dd/mm/yyyy)": "28/06/2023", "Operator (or Applicant)": "Conrad Energy (Developments) Ii Limited", "Site Name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Claire Court, Rawmarsh Road, Northfield", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S60 1RU", "X-coordinate": "442839", "Y-coordinate": "393428", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2023/0542", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.435899", "long": "-1.356632", "status": "planning", "mw": 40, "ext_id": "13774"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13774", "Record Last Updated (dd/mm/yyyy)": "28/06/2023", "Operator (or Applicant)": "Conrad Energy (Developments) Ii Limited", "Site Name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Claire Court, Rawmarsh Road, Northfield", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S60 1RU", "X-coordinate": "442839", "Y-coordinate": "393428", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2023/0542", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.435899", "long": "-1.356632", "status": "planning", "mw": 40, "ext_id": "13774"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "name_short": "Claire Court, Rawmarsh Road - Batte...", "owner": "Conrad Energy (Developments) Ii Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.435899", "long": "-1.356632", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.435899+-1.356632", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Melvich Bay - Melvich Wind Energy Hub", "city": "", "id": "1157", "external_id": "13826", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1157", "external_id": "13826", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Melvich Bay - Melvich Wind Energy Hub", "external_id": "13826", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 42, "power_mw": 42, "owner": "Belltown Power Limited", "status": "planning", "date_first_heard": "2023-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.554093", "long": "-3.919253", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13826", "Record Last Updated (dd/mm/yyyy)": "10/05/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Melvich Bay - Melvich Wind Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11669", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Melvich Bay, Melvich, Thurso", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7YJ", "X-coordinate": "288418", "Y-coordinate": "964488", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004515", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.554093", "long": "-3.919253", "status": "planning", "mw": 42, "ext_id": "13826"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13826", "Record Last Updated (dd/mm/yyyy)": "10/05/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Melvich Bay - Melvich Wind Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11669", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Melvich Bay, Melvich, Thurso", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7YJ", "X-coordinate": "288418", "Y-coordinate": "964488", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004515", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.554093", "long": "-3.919253", "status": "planning", "mw": 42, "ext_id": "13826"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 42, "mwh_is_estimate": true, "mwh": 42, "mwh_estimate": 42, "status": "planning", "status_class": "", "date_first_heard": "2023-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Melvich Bay - Melvich Wind Energy Hub", "name_short": "Melvich Bay - Melvich Wind Energy H...", "owner": "Belltown Power Limited", "state": "scotland", "country": "uk", "lat": "58.554093", "long": "-3.919253", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.554093+-3.919253", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bolney - Battery Storage", "city": "", "id": "1158", "external_id": "13880", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Bolney Green Energy Hub Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1158", "external_id": "13880", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bolney - Battery Storage", "external_id": "13880", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Bolney Green Energy Hub Limited", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.96964", "long": "-0.241682", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13880", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Bolney Green Energy Hub Limited", "Site Name": "Bolney - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land east of Wineham Lane, Wineham, Henfield", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "BN5 9AY", "X-coordinate": "523557", "Y-coordinate": "120385", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/21/2276", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.96964", "long": "-0.241682", "status": "planning", "mw": 200, "ext_id": "13880"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13880", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Bolney Green Energy Hub Limited", "Site Name": "Bolney - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land east of Wineham Lane, Wineham, Henfield", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "BN5 9AY", "X-coordinate": "523557", "Y-coordinate": "120385", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/21/2276", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.96964", "long": "-0.241682", "status": "planning", "mw": 200, "ext_id": "13880"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bolney - Battery Storage", "name_short": "Bolney", "owner": "Bolney Green Energy Hub Limited", "state": "south east", "country": "uk", "lat": "50.96964", "long": "-0.241682", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.96964+-0.241682", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "city": "", "id": "1159", "external_id": "13976", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1159", "external_id": "13976", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "external_id": "13976", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Novus Renewable Services Limited", "status": "planning", "date_first_heard": "2023-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.911726", "long": "-2.659699", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13976", "Record Last Updated (dd/mm/yyyy)": "30/05/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Peterstow Gas Compressor Station, Hentland, Ross on Wye", "County": "Herefordshire", "Region": "West Midlands", "Country": "England", "Post Code": "HR9 6AX", "X-coordinate": "354718", "Y-coordinate": "223894", "Planning Authority": "Hertfordshire County Council", "Planning Application Reference": "P231390/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.911726", "long": "-2.659699", "status": "planning", "mw": 49, "ext_id": "13976"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13976", "Record Last Updated (dd/mm/yyyy)": "30/05/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Peterstow Gas Compressor Station, Hentland, Ross on Wye", "County": "Herefordshire", "Region": "West Midlands", "Country": "England", "Post Code": "HR9 6AX", "X-coordinate": "354718", "Y-coordinate": "223894", "Planning Authority": "Hertfordshire County Council", "Planning Application Reference": "P231390/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.911726", "long": "-2.659699", "status": "planning", "mw": 49, "ext_id": "13976"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "name_short": "Peterstow Gas Compressor Station, H...", "owner": "Novus Renewable Services Limited", "state": "west midlands", "country": "uk", "lat": "51.911726", "long": "-2.659699", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.911726+-2.659699", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Marsh Lane, Gowhole - Energy Storage System", "city": "", "id": "1160", "external_id": "13982", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1160", "external_id": "13982", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Marsh Lane, Gowhole - Energy Storage System", "external_id": "13982", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Novus Renewable Services Limited", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.351096", "long": "-1.984773", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13982", "Record Last Updated (dd/mm/yyyy)": "31/05/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Marsh Lane, Gowhole - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Marsh Lane, Gowhole, High Peak", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK23 7QE", "X-coordinate": "401111", "Y-coordinate": "383801", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2023/0193", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.351096", "long": "-1.984773", "status": "planning", "mw": 30, "ext_id": "13982"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13982", "Record Last Updated (dd/mm/yyyy)": "31/05/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Marsh Lane, Gowhole - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Marsh Lane, Gowhole, High Peak", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK23 7QE", "X-coordinate": "401111", "Y-coordinate": "383801", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2023/0193", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.351096", "long": "-1.984773", "status": "planning", "mw": 30, "ext_id": "13982"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Marsh Lane, Gowhole - Energy Storage System", "name_short": "Marsh Lane, Gowhole", "owner": "Novus Renewable Services Limited", "state": "east midlands", "country": "uk", "lat": "53.351096", "long": "-1.984773", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.351096+-1.984773", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "city": "", "id": "1161", "external_id": "13986", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Drumlithie Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1161", "external_id": "13986", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "external_id": "13986", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Drumlithie Battery Limited", "status": "planning", "date_first_heard": "2023-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.928116", "long": "-2.345951", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13986", "Record Last Updated (dd/mm/yyyy)": "31/05/2023", "Operator (or Applicant)": "Drumlithie Battery Limited", "Site Name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Site To The North West Of Forest Avenue Cottage Drumlithie Stonehaven ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB39 3YH", "X-coordinate": "379042", "Y-coordinate": "781922", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0940", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.928116", "long": "-2.345951", "status": "planning", "mw": 49, "ext_id": "13986"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/05/2023", "to": "30/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "14/11/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13986", "Record Last Updated (dd/mm/yyyy)": "30/11/2023", "Operator (or Applicant)": "Drumlithie Battery Limited", "Site Name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Site To The North West Of Forest Avenue Cottage Drumlithie Stonehaven ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB39 3YH", "X-coordinate": "379042", "Y-coordinate": "781922", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0940", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.928116", "long": "-2.345951", "status": "planning", "mw": 49, "ext_id": "13986"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "name_short": "Forest Avenue Cottage, Drumlithie", "owner": "Drumlithie Battery Limited", "state": "scotland", "country": "uk", "lat": "56.928116", "long": "-2.345951", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.928116+-2.345951", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Abhainn Dubh Wind Farm", "city": "", "id": "1163", "external_id": "14039", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "E Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1163", "external_id": "14039", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Abhainn Dubh Wind Farm", "external_id": "14039", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "E Power Limited", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.540694", "long": "-5.71141", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14039", "Record Last Updated (dd/mm/yyyy)": "09/06/2023", "Operator (or Applicant)": "E Power Limited", "Site Name": "Abhainn Dubh Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11357", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Abhainn Dubh Wind Farm, Abhainn Dubh, Strathcarron", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV54 8XH", "X-coordinate": "177978", "Y-coordinate": "856137", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004732", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.540694", "long": "-5.71141", "status": "planning", "mw": 30, "ext_id": "14039"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14039", "Record Last Updated (dd/mm/yyyy)": "09/06/2023", "Operator (or Applicant)": "E Power Limited", "Site Name": "Abhainn Dubh Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11357", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Abhainn Dubh Wind Farm, Abhainn Dubh, Strathcarron", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV54 8XH", "X-coordinate": "177978", "Y-coordinate": "856137", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004732", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.540694", "long": "-5.71141", "status": "planning", "mw": 30, "ext_id": "14039"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Abhainn Dubh Wind Farm", "name_short": "Abhainn Dubh Wind Farm", "owner": "E Power Limited", "state": "scotland", "country": "uk", "lat": "57.540694", "long": "-5.71141", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.540694+-5.71141", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "J3 Business Park - Battery Storage Facility", "city": "", "id": "1164", "external_id": "14054", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Forepower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1164", "external_id": "14054", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "J3 Business Park - Battery Storage Facility", "external_id": "14054", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "Forepower Limited", "status": "planning", "date_first_heard": "2023-07-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.502987", "long": "-1.12784", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14054", "Record Last Updated (dd/mm/yyyy)": "13/06/2023", "Operator (or Applicant)": "Forepower Limited", "Site Name": "J3 Business Park - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Balby Carr Bank, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN4 8DE", "X-coordinate": "\t457947", "Y-coordinate": "\t401053", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/01072/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.502987", "long": "-1.12784", "status": "planning", "mw": 16, "ext_id": "14054"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/07/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "14054", "Record Last Updated (dd/mm/yyyy)": "13/06/2023", "Operator (or Applicant)": "Forepower Limited", "Site Name": "J3 Business Park - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Balby Carr Bank, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN4 8DE", "X-coordinate": "\t457947", "Y-coordinate": "\t401053", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/01072/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/07/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.502987", "long": "-1.12784", "status": "planning", "mw": 16, "ext_id": "14054"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2023-07-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "J3 Business Park - Battery Storage Facility", "name_short": "J3 Business Park", "owner": "Forepower Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.502987", "long": "-1.12784", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.502987+-1.12784", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eccles II Substation - Battery Energy Storage System", "city": "", "id": "1165", "external_id": "14058", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Intergen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1165", "external_id": "14058", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Eccles II Substation - Battery Energy Storage System", "external_id": "14058", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Intergen", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.672137", "long": "-2.326335", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14058", "Record Last Updated (dd/mm/yyyy)": "13/06/2023", "Operator (or Applicant)": "Intergen", "Site Name": "Eccles II Substation - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, approximately 2.3 km S/O Leitholm", "County": "Scottish Borders ", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 4JA", "X-coordinate": "379573", "Y-coordinate": "642119", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004804", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.672137", "long": "-2.326335", "status": "planning", "mw": 500, "ext_id": "14058"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14058", "Record Last Updated (dd/mm/yyyy)": "13/06/2023", "Operator (or Applicant)": "Intergen", "Site Name": "Eccles II Substation - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, approximately 2.3 km S/O Leitholm", "County": "Scottish Borders ", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 4JA", "X-coordinate": "379573", "Y-coordinate": "642119", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004804", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.672137", "long": "-2.326335", "status": "planning", "mw": 500, "ext_id": "14058"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Eccles II Substation - Battery Energy Storage System", "name_short": "Eccles II Substation - Battery", "owner": "Intergen", "state": "scotland", "country": "uk", "lat": "55.672137", "long": "-2.326335", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.672137+-2.326335", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lower Larks Farm - Battery storage", "city": "", "id": "1166", "external_id": "14076", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "RE Projects Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1166", "external_id": "14076", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lower Larks Farm - Battery storage", "external_id": "14076", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "RE Projects Development Limited", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.569086", "long": "-2.48078", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14076", "Record Last Updated (dd/mm/yyyy)": "15/06/2023", "Operator (or Applicant)": "RE Projects Development Limited", "Site Name": "Lower Larks Farm - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Larks Farm Larks Lane Iron Acton ", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "366774", "Y-coordinate": "185689", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P22/03743/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/04/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569086", "long": "-2.48078", "status": "planning", "mw": 99, "ext_id": "14076"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14076", "Record Last Updated (dd/mm/yyyy)": "15/06/2023", "Operator (or Applicant)": "RE Projects Development Limited", "Site Name": "Lower Larks Farm - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Larks Farm Larks Lane Iron Acton ", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "366774", "Y-coordinate": "185689", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P22/03743/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/04/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569086", "long": "-2.48078", "status": "planning", "mw": 99, "ext_id": "14076"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lower Larks Farm - Battery storage", "name_short": "Lower Larks Farm", "owner": "RE Projects Development Limited", "state": "south west", "country": "uk", "lat": "51.569086", "long": "-2.48078", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.569086+-2.48078", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Larks Lane, Iron Acton - Battery Storage Facility", "city": "", "id": "1167", "external_id": "14091", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "HD000ACT Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1167", "external_id": "14091", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Larks Lane, Iron Acton - Battery Storage Facility", "external_id": "14091", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "HD000ACT Limited", "status": "planning", "date_first_heard": "2023-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.569889", "long": "-2.477859", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14091", "Record Last Updated (dd/mm/yyyy)": "16/06/2023", "Operator (or Applicant)": "HD000ACT Limited", "Site Name": "Larks Lane, Iron Acton - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Larks Lane, E/O Larks Lane, Bristol", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "366977", "Y-coordinate": "185777", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P23/01616/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569889", "long": "-2.477859", "status": "planning", "mw": 20, "ext_id": "14091"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14091", "Record Last Updated (dd/mm/yyyy)": "16/06/2023", "Operator (or Applicant)": "HD000ACT Limited", "Site Name": "Larks Lane, Iron Acton - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Larks Lane, E/O Larks Lane, Bristol", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "366977", "Y-coordinate": "185777", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P23/01616/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569889", "long": "-2.477859", "status": "planning", "mw": 20, "ext_id": "14091"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Larks Lane, Iron Acton - Battery Storage Facility", "name_short": "Larks Lane, Iron Acton", "owner": "HD000ACT Limited", "state": "south west", "country": "uk", "lat": "51.569889", "long": "-2.477859", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.569889+-2.477859", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Quarterland Road, Islandmagee - Battery Storage", "city": "", "id": "1168", "external_id": "14117", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Solo Renewables Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1168", "external_id": "14117", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Quarterland Road, Islandmagee - Battery Storage", "external_id": "14117", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 75, "power_mw": 75, "owner": "Solo Renewables Ltd", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.84755", "long": "-5.777836", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14117", "Record Last Updated (dd/mm/yyyy)": "20/06/2023", "Operator (or Applicant)": "Solo Renewables Ltd", "Site Name": "Quarterland Road, Islandmagee - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "75", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Quarterland Road, Islandmagee", "County": "Mid & East Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT40 3RW", "X-coordinate": "\t157572", "Y-coordinate": "\t556847", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA02/2023/1283/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.84755", "long": "-5.777836", "status": "planning", "mw": 75, "ext_id": "14117"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14117", "Record Last Updated (dd/mm/yyyy)": "20/06/2023", "Operator (or Applicant)": "Solo Renewables Ltd", "Site Name": "Quarterland Road, Islandmagee - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "75", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Quarterland Road, Islandmagee", "County": "Mid & East Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT40 3RW", "X-coordinate": "\t157572", "Y-coordinate": "\t556847", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA02/2023/1283/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.84755", "long": "-5.777836", "status": "planning", "mw": 75, "ext_id": "14117"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 75, "mwh_is_estimate": true, "mwh": 75, "mwh_estimate": 75, "status": "planning", "status_class": "", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Quarterland Road, Islandmagee - Battery Storage", "name_short": "Quarterland Road, Islandmagee", "owner": "Solo Renewables Ltd", "state": "northern ireland", "country": "uk", "lat": "54.84755", "long": "-5.777836", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.84755+-5.777836", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Doogary Road, Omagh - Battery Storage", "city": "", "id": "1169", "external_id": "14125", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Omagh BES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1169", "external_id": "14125", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Doogary Road, Omagh - Battery Storage", "external_id": "14125", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Omagh BES Limited", "status": "planning", "date_first_heard": "2023-06-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.572483", "long": "-7.279008", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14125", "Record Last Updated (dd/mm/yyyy)": "21/06/2023", "Operator (or Applicant)": "Omagh BES Limited", "Site Name": "Doogary Road, Omagh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "160m Northwest Of No 80 Doogary Road, Omagh", "County": "Fermanagh & Omagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT79 0BJ", "X-coordinate": "58975", "Y-coordinate": "532518", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA10/2023/1605/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572483", "long": "-7.279008", "status": "planning", "mw": 40, "ext_id": "14125"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "County", "from": "Fermanagh & Omagh", "to": "Co. Fermanagh & Omagh", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "14125", "Record Last Updated (dd/mm/yyyy)": "21/06/2023", "Operator (or Applicant)": "Omagh BES Limited", "Site Name": "Doogary Road, Omagh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "160m Northwest Of No 80 Doogary Road, Omagh", "County": "Co. Fermanagh & Omagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT79 0BJ", "X-coordinate": "58975", "Y-coordinate": "532518", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA10/2023/1605/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572483", "long": "-7.279008", "status": "planning", "mw": 40, "ext_id": "14125"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-06-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Doogary Road, Omagh - Battery Storage", "name_short": "Doogary Road, Omagh", "owner": "Omagh BES Limited", "state": "northern ireland", "country": "uk", "lat": "54.572483", "long": "-7.279008", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.572483+-7.279008", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ash Farm, Titchfield Lane - Battery Storage", "city": "", "id": "1170", "external_id": "14145", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Botley Energy Reserve 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1170", "external_id": "14145", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ash Farm, Titchfield Lane - Battery Storage", "external_id": "14145", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Botley Energy Reserve 2 Limited", "status": "planning", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.886208", "long": "-1.217522", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14145", "Record Last Updated (dd/mm/yyyy)": "27/06/2023", "Operator (or Applicant)": "Botley Energy Reserve 2 Limited", "Site Name": "Ash Farm, Titchfield Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Titchfield Lane, Whiteley, Fareham", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO15 6DY", "X-coordinate": "455138", "Y-coordinate": "109927", "Planning Authority": "Winchester City Council", "Planning Application Reference": "23/01106/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.886208", "long": "-1.217522", "status": "planning", "mw": 15, "ext_id": "14145"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14145", "Record Last Updated (dd/mm/yyyy)": "27/06/2023", "Operator (or Applicant)": "Botley Energy Reserve 2 Limited", "Site Name": "Ash Farm, Titchfield Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Titchfield Lane, Whiteley, Fareham", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO15 6DY", "X-coordinate": "455138", "Y-coordinate": "109927", "Planning Authority": "Winchester City Council", "Planning Application Reference": "23/01106/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.886208", "long": "-1.217522", "status": "planning", "mw": 15, "ext_id": "14145"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ash Farm, Titchfield Lane - Battery Storage", "name_short": "Ash Farm, Titchfield Lane", "owner": "Botley Energy Reserve 2 Limited", "state": "south east", "country": "uk", "lat": "50.886208", "long": "-1.217522", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.886208+-1.217522", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bishopmill - Battery Energy Storage", "city": "", "id": "1171", "external_id": "14191", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1171", "external_id": "14191", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bishopmill - Battery Energy Storage", "external_id": "14191", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Green Power Consultants", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.669842", "long": "-3.31029", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14191", "Record Last Updated (dd/mm/yyyy)": "03/07/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Bishopmill - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "To E/O A941 Bishopmill, Elgin", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV30 4FF", "X-coordinate": "321938", "Y-coordinate": "865196", "Planning Authority": "Moray Council", "Planning Application Reference": "23/00994/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.669842", "long": "-3.31029", "status": "planning", "mw": 30, "ext_id": "14191"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/07/2023", "to": "02/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "14191", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Bishopmill - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "To E/O A941 Bishopmill, Elgin", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV30 4FF", "X-coordinate": "321938", "Y-coordinate": "865196", "Planning Authority": "Moray Council", "Planning Application Reference": "23/00994/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.669842", "long": "-3.31029", "status": "planning", "mw": 30, "ext_id": "14191"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bishopmill - Battery Energy Storage", "name_short": "Bishopmill", "owner": "Green Power Consultants", "state": "scotland", "country": "uk", "lat": "57.669842", "long": "-3.31029", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.669842+-3.31029", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clough Road - Battery Energy System", "city": "", "id": "1172", "external_id": "14225", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "GAM Capital Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1172", "external_id": "14225", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clough Road - Battery Energy System", "external_id": "14225", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 130, "power_mw": 130, "owner": "GAM Capital Limited", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.767186", "long": "-0.339722", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14225", "Record Last Updated (dd/mm/yyyy)": "06/07/2023", "Operator (or Applicant)": "GAM Capital Limited", "Site Name": "Clough Road - Battery Energy System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "130", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Clough Road, Kingston Upon Hull", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU5 1SW", "X-coordinate": "509533", "Y-coordinate": "431372", "Planning Authority": "Hull City Council", "Planning Application Reference": "23/02771/FULL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.767186", "long": "-0.339722", "status": "planning", "mw": 130, "ext_id": "14225"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/07/2023", "to": "20/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "12/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "14225", "Record Last Updated (dd/mm/yyyy)": "20/09/2023", "Operator (or Applicant)": "GAM Capital Limited", "Site Name": "Clough Road - Battery Energy System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "130", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Clough Road, Kingston Upon Hull", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU5 1SW", "X-coordinate": "509533", "Y-coordinate": "431372", "Planning Authority": "Hull City Council", "Planning Application Reference": "23/02771/FULL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.767186", "long": "-0.339722", "status": "planning", "mw": 130, "ext_id": "14225"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 130, "mwh_is_estimate": true, "mwh": 130, "mwh_estimate": 130, "status": "planning", "status_class": "", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clough Road - Battery Energy System", "name_short": "Clough Road - Battery Energy System", "owner": "GAM Capital Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.767186", "long": "-0.339722", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.767186+-0.339722", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Frome Power, Styles Close - Energy Storage Facility", "city": "", "id": "1173", "external_id": "14227", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Trina Solar UK Hold Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1173", "external_id": "14227", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Frome Power, Styles Close - Energy Storage Facility", "external_id": "14227", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Trina Solar UK Hold Co Limited", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.230434", "long": "-2.303287", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14227", "Record Last Updated (dd/mm/yyyy)": "06/07/2023", "Operator (or Applicant)": "Trina Solar UK Hold Co Limited", "Site Name": "Frome Power, Styles Close - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Styles Close & E/O The Existing Frome, 132/33kv Bulk Supply Point Substation, Frome", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "BA11 5JS", "X-coordinate": "378920", "Y-coordinate": "147960", "Planning Authority": "Somerset County Council", "Planning Application Reference": "2023/1070/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.230434", "long": "-2.303287", "status": "planning", "mw": 30, "ext_id": "14227"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14227", "Record Last Updated (dd/mm/yyyy)": "06/07/2023", "Operator (or Applicant)": "Trina Solar UK Hold Co Limited", "Site Name": "Frome Power, Styles Close - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Styles Close & E/O The Existing Frome, 132/33kv Bulk Supply Point Substation, Frome", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "BA11 5JS", "X-coordinate": "378920", "Y-coordinate": "147960", "Planning Authority": "Somerset County Council", "Planning Application Reference": "2023/1070/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.230434", "long": "-2.303287", "status": "planning", "mw": 30, "ext_id": "14227"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Frome Power, Styles Close - Energy Storage Facility", "name_short": "Frome Power, Styles Close - Energy", "owner": "Trina Solar UK Hold Co Limited", "state": "south west", "country": "uk", "lat": "51.230434", "long": "-2.303287", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.230434+-2.303287", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chingjia Energy", "city": "", "id": "1175", "external_id": "", "state": "", "country": "taiwan", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Chingjia Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.222065", "long": "120.945036", "coords_hint": "-2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1693770142554189983", "link2": "", "link3": "", "link4": ""}, "internal_id": "1175", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chingjia Energy", "name_short": "Chingjia", "owner": "Chingjia Energy", "state": "", "country": "taiwan", "lat": "24.222065", "long": "120.945036", "coords_hint": -2, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the country is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:24.222065+120.945036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/Tesla_Megapack/status/1693770142554189983"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "West Leake Lane, Ratcliffe - Battery Storage", "city": "", "id": "1192", "external_id": "12464", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "600", "customer": "", "owner": "Sandbrook Capital BES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1192", "external_id": "12464", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Leake Lane, Ratcliffe - Battery Storage", "external_id": "12464", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 600, "power_mw": 600, "owner": "Sandbrook Capital BES Limited", "status": "planning", "date_first_heard": "2023-07-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.833796", "long": "-1.216974", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12464", "Record Last Updated (dd/mm/yyyy)": "31/07/2023", "Operator (or Applicant)": "Sandbrook Capital BES Limited", "Site Name": "West Leake Lane, Ratcliffe - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "600", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Leake Lane West Leake Lane Ratcliffe On Soar ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "LE12 5RF", "X-coordinate": "452849", "Y-coordinate": "326540", "Planning Authority": "Rushcliffe Council", "Planning Application Reference": "23/01285/FUL\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.833796", "long": "-1.216974", "status": "planning", "mw": 600, "ext_id": "12464"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12464", "Record Last Updated (dd/mm/yyyy)": "31/07/2023", "Operator (or Applicant)": "Sandbrook Capital BES Limited", "Site Name": "West Leake Lane, Ratcliffe - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "600", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Leake Lane West Leake Lane Ratcliffe On Soar ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "LE12 5RF", "X-coordinate": "452849", "Y-coordinate": "326540", "Planning Authority": "Rushcliffe Council", "Planning Application Reference": "23/01285/FUL\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.833796", "long": "-1.216974", "status": "planning", "mw": 600, "ext_id": "12464"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 600, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2023-07-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Leake Lane, Ratcliffe - Battery Storage", "name_short": "West Leake Lane, Ratcliffe", "owner": "Sandbrook Capital BES Limited", "state": "east midlands", "country": "uk", "lat": "52.833796", "long": "-1.216974", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.833796+-1.216974", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "city": "", "id": "1193", "external_id": "12496", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pulse Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1193", "external_id": "12496", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "external_id": "12496", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pulse Clean Energy", "status": "planning", "date_first_heard": "2023-05-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.249813", "long": "-0.875342", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12496", "Record Last Updated (dd/mm/yyyy)": "14/09/2023", "Operator (or Applicant)": "Pulse Clean Energy", "Site Name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blue Bell Lodge Rye Common Lane Crondall", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DE", "X-coordinate": "478590", "Y-coordinate": "150672", "Planning Authority": "Hart District Council", "Planning Application Reference": "22/02917/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.249813", "long": "-0.875342", "status": "planning", "mw": 49, "ext_id": "12496"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12496", "Record Last Updated (dd/mm/yyyy)": "14/09/2023", "Operator (or Applicant)": "Pulse Clean Energy", "Site Name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blue Bell Lodge Rye Common Lane Crondall", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DE", "X-coordinate": "478590", "Y-coordinate": "150672", "Planning Authority": "Hart District Council", "Planning Application Reference": "22/02917/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.249813", "long": "-0.875342", "status": "planning", "mw": 49, "ext_id": "12496"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-05-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "name_short": "Blue Bell Lodge, Rye Common Lane", "owner": "Pulse Clean Energy", "state": "south east", "country": "uk", "lat": "51.249813", "long": "-0.875342", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.249813+-0.875342", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barfield Lane, Reepham - Battery Energy Storage System", "city": "", "id": "1194", "external_id": "12600", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "53", "power_mw": "53", "customer": "", "owner": "Fiskerton Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1194", "external_id": "12600", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barfield Lane, Reepham - Battery Energy Storage System", "external_id": "12600", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 53, "power_mw": 53, "owner": "Fiskerton Bess Limited", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.250093", "long": "-0.445801", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12600", "Record Last Updated (dd/mm/yyyy)": "27/09/2023", "Operator (or Applicant)": "Fiskerton Bess Limited", "Site Name": "Barfield Lane, Reepham - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "53", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Barfield Lane, Reepham, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "LN3 4DP", "X-coordinate": "503796", "Y-coordinate": "373691", "Planning Authority": "West Lindsey District Council", "Planning Application Reference": "147131", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.250093", "long": "-0.445801", "status": "planning", "mw": 53, "ext_id": "12600"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12600", "Record Last Updated (dd/mm/yyyy)": "27/09/2023", "Operator (or Applicant)": "Fiskerton Bess Limited", "Site Name": "Barfield Lane, Reepham - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "53", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Barfield Lane, Reepham, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "LN3 4DP", "X-coordinate": "503796", "Y-coordinate": "373691", "Planning Authority": "West Lindsey District Council", "Planning Application Reference": "147131", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.250093", "long": "-0.445801", "status": "planning", "mw": 53, "ext_id": "12600"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 53, "mwh_is_estimate": true, "mwh": 53, "mwh_estimate": 53, "status": "planning", "status_class": "", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barfield Lane, Reepham - Battery Energy Storage System", "name_short": "Barfield Lane, Reepham - Battery", "owner": "Fiskerton Bess Limited", "state": "east midlands", "country": "uk", "lat": "53.250093", "long": "-0.445801", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.250093+-0.445801", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "East Chickerell Court Farm - Battery Energy Storage System", "city": "", "id": "1195", "external_id": "12651", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1195", "external_id": "12651", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Chickerell Court Farm - Battery Energy Storage System", "external_id": "12651", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.628557", "long": "-2.490346", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12651", "Record Last Updated (dd/mm/yyyy)": "06/10/2023", "Operator (or Applicant)": "Statera Energy", "Site Name": "East Chickerell Court Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Chickerell Court Farm, Chickerell, Weymouth", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT3 4BG", "X-coordinate": "365414", "Y-coordinate": "81099", "Planning Authority": "Dorset Council", "Planning Application Reference": "P/FUL/2023/04657", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.628557", "long": "-2.490346", "status": "planning", "mw": 400, "ext_id": "12651"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12651", "Record Last Updated (dd/mm/yyyy)": "06/10/2023", "Operator (or Applicant)": "Statera Energy", "Site Name": "East Chickerell Court Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Chickerell Court Farm, Chickerell, Weymouth", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT3 4BG", "X-coordinate": "365414", "Y-coordinate": "81099", "Planning Authority": "Dorset Council", "Planning Application Reference": "P/FUL/2023/04657", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.628557", "long": "-2.490346", "status": "planning", "mw": 400, "ext_id": "12651"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Chickerell Court Farm - Battery Energy Storage System", "name_short": "East Chickerell Court Farm - Batter...", "owner": "Statera Energy", "state": "south west", "country": "uk", "lat": "50.628557", "long": "-2.490346", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.628557+-2.490346", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Old Vicarage, Reedley - Battery Storage", "city": "", "id": "1196", "external_id": "12767", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "European Energy A/S", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1196", "external_id": "12767", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Old Vicarage, Reedley - Battery Storage", "external_id": "12767", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "European Energy A/S", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.817249", "long": "-2.253053", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12767", "Record Last Updated (dd/mm/yyyy)": "17/08/2023", "Operator (or Applicant)": "European Energy A/S", "Site Name": "The Old Vicarage, Reedley - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O The Old Vicarage, Greenhead Lane, Reedley, Burnley", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB12 9NR", "X-coordinate": "383437", "Y-coordinate": "435693", "Planning Authority": "Pendle Borough Council", "Planning Application Reference": "23/0507/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.817249", "long": "-2.253053", "status": "planning", "mw": 100, "ext_id": "12767"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12767", "Record Last Updated (dd/mm/yyyy)": "17/08/2023", "Operator (or Applicant)": "European Energy A/S", "Site Name": "The Old Vicarage, Reedley - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O The Old Vicarage, Greenhead Lane, Reedley, Burnley", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB12 9NR", "X-coordinate": "383437", "Y-coordinate": "435693", "Planning Authority": "Pendle Borough Council", "Planning Application Reference": "23/0507/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.817249", "long": "-2.253053", "status": "planning", "mw": 100, "ext_id": "12767"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Old Vicarage, Reedley - Battery Storage", "name_short": "The Old Vicarage, Reedley", "owner": "European Energy A/S", "state": "north west", "country": "uk", "lat": "53.817249", "long": "-2.253053", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.817249+-2.253053", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Shetland Battery Energy Storage System", "city": "", "id": "1197", "external_id": "12856", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1197", "external_id": "12856", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Shetland Battery Energy Storage System", "external_id": "12856", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "Zenobe Energy", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "60.169164", "long": "-1.168878", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12856", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Shetland Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Blackhill Industrial Estate, Genista, Lerwick", "County": "Islands", "Region": "Scotland", "Country": "Scotland", "Post Code": "ZE1 0DG", "X-coordinate": "446222", "Y-coordinate": "1143036", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004881", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "60.169164", "long": "-1.168878", "status": "planning", "mw": 70, "ext_id": "12856"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12856", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Shetland Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Blackhill Industrial Estate, Genista, Lerwick", "County": "Islands", "Region": "Scotland", "Country": "Scotland", "Post Code": "ZE1 0DG", "X-coordinate": "446222", "Y-coordinate": "1143036", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004881", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "60.169164", "long": "-1.168878", "status": "planning", "mw": 70, "ext_id": "12856"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Shetland Battery Energy Storage System", "name_short": "Shetland Battery", "owner": "Zenobe Energy", "state": "scotland", "country": "uk", "lat": "60.169164", "long": "-1.168878", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:60.169164+-1.168878", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rigifa Cove Road - Battery Storage", "city": "", "id": "1198", "external_id": "12970", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Source Galileo Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1198", "external_id": "12970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rigifa Cove Road - Battery Storage", "external_id": "12970", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Source Galileo Limited", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.093185", "long": "-2.083467", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12970", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Source Galileo Limited", "Site Name": "Rigifa Cove Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rigifa Cove Road, Aberdeen", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB12 3LR", "X-coordinate": "395041", "Y-coordinate": "800247", "Planning Authority": "Aberdeen City Council", "Planning Application Reference": "231336/DPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.093185", "long": "-2.083467", "status": "planning", "mw": 49, "ext_id": "12970"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12970", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Source Galileo Limited", "Site Name": "Rigifa Cove Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rigifa Cove Road, Aberdeen", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB12 3LR", "X-coordinate": "395041", "Y-coordinate": "800247", "Planning Authority": "Aberdeen City Council", "Planning Application Reference": "231336/DPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.093185", "long": "-2.083467", "status": "planning", "mw": 49, "ext_id": "12970"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rigifa Cove Road - Battery Storage", "name_short": "Rigifa Cove Road", "owner": "Source Galileo Limited", "state": "scotland", "country": "uk", "lat": "57.093185", "long": "-2.083467", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.093185+-2.083467", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kinmuck Battery Energy Storage", "city": "", "id": "1199", "external_id": "13001", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "105", "power_mw": "105", "customer": "", "owner": "Kinmuck Energy Storage Limited / Island Green Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1199", "external_id": "13001", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kinmuck Battery Energy Storage", "external_id": "13001", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 105, "power_mw": 105, "owner": "Kinmuck Energy Storage Limited / Island Green Power", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.416021", "long": "-2.007609", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13001", "Record Last Updated (dd/mm/yyyy)": "09/10/2023", "Operator (or Applicant)": "Kinmuck Energy Storage Limited / Island Green Power", "Site Name": "Kinmuck Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "105", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kinmuck Farm, Ellon", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB41 8DB", "X-coordinate": "399642", "Y-coordinate": "\t836183", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004907", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.416021", "long": "-2.007609", "status": "planning", "mw": 105, "ext_id": "13001"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13001", "Record Last Updated (dd/mm/yyyy)": "09/10/2023", "Operator (or Applicant)": "Kinmuck Energy Storage Limited / Island Green Power", "Site Name": "Kinmuck Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "105", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kinmuck Farm, Ellon", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB41 8DB", "X-coordinate": "399642", "Y-coordinate": "\t836183", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004907", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.416021", "long": "-2.007609", "status": "planning", "mw": 105, "ext_id": "13001"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 105, "mwh_is_estimate": true, "mwh": 105, "mwh_estimate": 105, "status": "planning", "status_class": "", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kinmuck Battery Energy Storage", "name_short": "Kinmuck", "owner": "Kinmuck Energy Storage Limited / Island Green Power", "state": "scotland", "country": "uk", "lat": "57.416021", "long": "-2.007609", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.416021+-2.007609", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "city": "", "id": "1200", "external_id": "13217", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Boom Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1200", "external_id": "13217", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "external_id": "13217", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Boom Developments Limited", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.399804", "long": "-4.44122", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13217", "Record Last Updated (dd/mm/yyyy)": "04/09/2023", "Operator (or Applicant)": "Boom Developments Limited", "Site Name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrog Ganol, Rhosgoch", "County": "Isle of Anglesey", "Region": "Wales", "Country": "Wales", "Post Code": "LL66 0AY", "X-coordinate": "237793", "Y-coordinate": "391997", "Planning Authority": "Isle of Anglesey Council", "Planning Application Reference": "FPL/2023/218", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.399804", "long": "-4.44122", "status": "planning", "mw": 49, "ext_id": "13217"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13217", "Record Last Updated (dd/mm/yyyy)": "04/09/2023", "Operator (or Applicant)": "Boom Developments Limited", "Site Name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrog Ganol, Rhosgoch", "County": "Isle of Anglesey", "Region": "Wales", "Country": "Wales", "Post Code": "LL66 0AY", "X-coordinate": "237793", "Y-coordinate": "391997", "Planning Authority": "Isle of Anglesey Council", "Planning Application Reference": "FPL/2023/218", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.399804", "long": "-4.44122", "status": "planning", "mw": 49, "ext_id": "13217"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "name_short": "Carrog Ganol, Rhosgoch - Battery", "owner": "Boom Developments Limited", "state": "wales", "country": "uk", "lat": "53.399804", "long": "-4.44122", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.399804+-4.44122", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "city": "", "id": "1201", "external_id": "13310", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1201", "external_id": "13310", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "external_id": "13310", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "RES Limited", "status": "planning", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.778118", "long": "-3.057189", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13310", "Record Last Updated (dd/mm/yyyy)": "01/03/2023", "Operator (or Applicant)": "RES Limited", "Site Name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13176", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O Penicuik & Ne/O Stow, Moorfoot Hills, Gorebridge village, Edinburgh", "County": "Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH23 4TR", "X-coordinate": "333786", "Y-coordinate": "654372", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004661", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.778118", "long": "-3.057189", "status": "planning", "mw": 50, "ext_id": "13310"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13310", "Record Last Updated (dd/mm/yyyy)": "01/03/2023", "Operator (or Applicant)": "RES Limited", "Site Name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13176", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O Penicuik & Ne/O Stow, Moorfoot Hills, Gorebridge village, Edinburgh", "County": "Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH23 4TR", "X-coordinate": "333786", "Y-coordinate": "654372", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004661", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.778118", "long": "-3.057189", "status": "planning", "mw": 50, "ext_id": "13310"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "name_short": "Penicuik, Moorfoot Hills - Torfiche...", "owner": "RES Limited", "state": "scotland", "country": "uk", "lat": "55.778118", "long": "-3.057189", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.778118+-3.057189", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "city": "", "id": "1202", "external_id": "13323", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1202", "external_id": "13323", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "external_id": "13323", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "RNA Energy Limited", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.570895", "long": "-4.481011", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13323", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "RNA Energy Limited", "Site Name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Inchbean Farm, Treeswoodhead Road, Shortlees, Kilmarnock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5LL", "X-coordinate": "243666", "Y-coordinate": "633598", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004968", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.570895", "long": "-4.481011", "status": "planning", "mw": 60, "ext_id": "13323"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13323", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "RNA Energy Limited", "Site Name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Inchbean Farm, Treeswoodhead Road, Shortlees, Kilmarnock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5LL", "X-coordinate": "243666", "Y-coordinate": "633598", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004968", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.570895", "long": "-4.481011", "status": "planning", "mw": 60, "ext_id": "13323"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "name_short": "Inchbean Farm, Treeswoodhead Road -...", "owner": "RNA Energy Limited", "state": "scotland", "country": "uk", "lat": "55.570895", "long": "-4.481011", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.570895+-4.481011", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Learielaw Farm, Learielaw - Battery Energy Storage", "city": "", "id": "1203", "external_id": "13368", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1203", "external_id": "13368", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Learielaw Farm, Learielaw - Battery Energy Storage", "external_id": "13368", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.920858", "long": "-3.463207", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13368", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Learielaw Farm, Learielaw - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7970", "Address": "Learielaw Farm, Learielaw, Broxburn", "County": "Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH52 5PG", "X-coordinate": "308656", "Y-coordinate": "670720", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004983", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.920858", "long": "-3.463207", "status": "planning", "mw": 100, "ext_id": "13368"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13368", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Learielaw Farm, Learielaw - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7970", "Address": "Learielaw Farm, Learielaw, Broxburn", "County": "Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH52 5PG", "X-coordinate": "308656", "Y-coordinate": "670720", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004983", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.920858", "long": "-3.463207", "status": "planning", "mw": 100, "ext_id": "13368"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Learielaw Farm, Learielaw - Battery Energy Storage", "name_short": "Learielaw Farm, Learielaw", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "55.920858", "long": "-3.463207", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.920858+-3.463207", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "city": "", "id": "1204", "external_id": "13449", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1204", "external_id": "13449", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "external_id": "13449", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Private Developer", "status": "planning", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.783683", "long": "-4.191709", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13449", "Record Last Updated (dd/mm/yyyy)": "22/09/2023", "Operator (or Applicant)": "Private Developer", "Site Name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Rogerton Cottage, Markethill Road, East Kilbride, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G74 4NU", "X-coordinate": "262652", "Y-coordinate": "656660", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/23/1033", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.783683", "long": "-4.191709", "status": "planning", "mw": 50, "ext_id": "13449"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13449", "Record Last Updated (dd/mm/yyyy)": "22/09/2023", "Operator (or Applicant)": "Private Developer", "Site Name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Rogerton Cottage, Markethill Road, East Kilbride, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G74 4NU", "X-coordinate": "262652", "Y-coordinate": "656660", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/23/1033", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.783683", "long": "-4.191709", "status": "planning", "mw": 50, "ext_id": "13449"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "name_short": "East Rogerton Cottage, Markethill R...", "owner": "Private Developer", "state": "scotland", "country": "uk", "lat": "55.783683", "long": "-4.191709", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.783683+-4.191709", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newton Farm, Westburn Road - Battery Storage Facility", "city": "", "id": "1205", "external_id": "13450", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Bluefield Renewable Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1205", "external_id": "13450", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newton Farm, Westburn Road - Battery Storage Facility", "external_id": "13450", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Bluefield Renewable Developments Limited", "status": "planning", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.820793", "long": "-4.121448", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13450", "Record Last Updated (dd/mm/yyyy)": "04/08/2023", "Operator (or Applicant)": "Bluefield Renewable Developments Limited", "Site Name": "Newton Farm, Westburn Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "310m Ne/O Newhouse Farm, Newton Farm, Westburn Road, Cambuslang", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G72 7UZ", "X-coordinate": "267184", "Y-coordinate": "660652", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/23/0886", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.820793", "long": "-4.121448", "status": "planning", "mw": 40, "ext_id": "13450"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13450", "Record Last Updated (dd/mm/yyyy)": "04/08/2023", "Operator (or Applicant)": "Bluefield Renewable Developments Limited", "Site Name": "Newton Farm, Westburn Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "310m Ne/O Newhouse Farm, Newton Farm, Westburn Road, Cambuslang", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G72 7UZ", "X-coordinate": "267184", "Y-coordinate": "660652", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/23/0886", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.820793", "long": "-4.121448", "status": "planning", "mw": 40, "ext_id": "13450"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newton Farm, Westburn Road - Battery Storage Facility", "name_short": "Newton Farm, Westburn Road", "owner": "Bluefield Renewable Developments Limited", "state": "scotland", "country": "uk", "lat": "55.820793", "long": "-4.121448", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.820793+-4.121448", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Longcroft Wind Farm", "city": "", "id": "1206", "external_id": "13539", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Energy Systems", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1206", "external_id": "13539", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Longcroft Wind Farm", "external_id": "13539", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Renewable Energy Systems", "status": "planning", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.794504", "long": "-2.728687", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13539", "Record Last Updated (dd/mm/yyyy)": "17/11/2023", "Operator (or Applicant)": "Renewable Energy Systems", "Site Name": "Longcroft Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13538", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Longcroft Wind Farm Land East Of Longcroft Farmhouse Oxton", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD2 6QZ", "X-coordinate": "354410", "Y-coordinate": "655930", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004774", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.794504", "long": "-2.728687", "status": "planning", "mw": 50, "ext_id": "13539"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13539", "Record Last Updated (dd/mm/yyyy)": "17/11/2023", "Operator (or Applicant)": "Renewable Energy Systems", "Site Name": "Longcroft Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13538", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Longcroft Wind Farm Land East Of Longcroft Farmhouse Oxton", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD2 6QZ", "X-coordinate": "354410", "Y-coordinate": "655930", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004774", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.794504", "long": "-2.728687", "status": "planning", "mw": 50, "ext_id": "13539"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Longcroft Wind Farm", "name_short": "Longcroft Wind Farm", "owner": "Renewable Energy Systems", "state": "scotland", "country": "uk", "lat": "55.794504", "long": "-2.728687", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.794504+-2.728687", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Butts Field, Mill Lane - Battery Storage", "city": "", "id": "1207", "external_id": "13573", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Ecotricity Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1207", "external_id": "13573", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Butts Field, Mill Lane - Battery Storage", "external_id": "13573", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Ecotricity Generation Limited", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.896281", "long": "-1.343237", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13573", "Record Last Updated (dd/mm/yyyy)": "15/12/2023", "Operator (or Applicant)": "Ecotricity Generation Limited", "Site Name": "Butts Field, Mill Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Butts Field Mill Lane, Nursling, Southampton", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO19 0EP", "X-coordinate": "446285", "Y-coordinate": "110961", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "23/02942/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.896281", "long": "-1.343237", "status": "planning", "mw": 99, "ext_id": "13573"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13573", "Record Last Updated (dd/mm/yyyy)": "15/12/2023", "Operator (or Applicant)": "Ecotricity Generation Limited", "Site Name": "Butts Field, Mill Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Butts Field Mill Lane, Nursling, Southampton", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO19 0EP", "X-coordinate": "446285", "Y-coordinate": "110961", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "23/02942/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.896281", "long": "-1.343237", "status": "planning", "mw": 99, "ext_id": "13573"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Butts Field, Mill Lane - Battery Storage", "name_short": "Butts Field, Mill Lane", "owner": "Ecotricity Generation Limited", "state": "south east", "country": "uk", "lat": "50.896281", "long": "-1.343237", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.896281+-1.343237", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "city": "", "id": "1208", "external_id": "13595", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Epsilon Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1208", "external_id": "13595", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "external_id": "13595", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Epsilon Generation", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.462653", "long": "-3.094766", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13595", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Epsilon Generation", "Site Name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dormitories Star Inn Farm C12 From A90 At Star Inn Farm To U329 At Mains Of Fowlis\ufffd", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 5EJ", "X-coordinate": "332638", "Y-coordinate": "730594", "Planning Authority": "Dundee City Council", "Planning Application Reference": "23/00539/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.462653", "long": "-3.094766", "status": "planning", "mw": 49, "ext_id": "13595"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13595", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Epsilon Generation", "Site Name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dormitories Star Inn Farm C12 From A90 At Star Inn Farm To U329 At Mains Of Fowlis\ufffd", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 5EJ", "X-coordinate": "332638", "Y-coordinate": "730594", "Planning Authority": "Dundee City Council", "Planning Application Reference": "23/00539/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.462653", "long": "-3.094766", "status": "planning", "mw": 49, "ext_id": "13595"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "name_short": "Dormitories Star Inn Farm, Mains Of...", "owner": "Epsilon Generation", "state": "scotland", "country": "uk", "lat": "56.462653", "long": "-3.094766", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.462653+-3.094766", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dolphingstone Farm - Battery Energy Storage System", "city": "", "id": "1209", "external_id": "13618", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "63", "power_mw": "63", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1209", "external_id": "13618", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dolphingstone Farm - Battery Energy Storage System", "external_id": "13618", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 63, "power_mw": 63, "owner": "RNA Energy Limited", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.94457", "long": "-2.990629", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13618", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "RNA Energy Limited", "Site Name": "Dolphingstone Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "63", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dolphingstone Farm, Tranent", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH33 1NH", "X-coordinate": "338226", "Y-coordinate": "672835", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004969", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.94457", "long": "-2.990629", "status": "planning", "mw": 63, "ext_id": "13618"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13618", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "RNA Energy Limited", "Site Name": "Dolphingstone Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "63", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dolphingstone Farm, Tranent", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH33 1NH", "X-coordinate": "338226", "Y-coordinate": "672835", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004969", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.94457", "long": "-2.990629", "status": "planning", "mw": 63, "ext_id": "13618"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 63, "mwh_is_estimate": true, "mwh": 63, "mwh_estimate": 63, "status": "planning", "status_class": "", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dolphingstone Farm - Battery Energy Storage System", "name_short": "Dolphingstone Farm - Battery", "owner": "RNA Energy Limited", "state": "scotland", "country": "uk", "lat": "55.94457", "long": "-2.990629", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.94457+-2.990629", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Persley Croft - Battery Storage", "city": "", "id": "1210", "external_id": "13684", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RE Projects Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1210", "external_id": "13684", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Persley Croft - Battery Storage", "external_id": "13684", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RE Projects Development", "status": "planning", "date_first_heard": "2023-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.182309", "long": "-2.147753", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13684", "Record Last Updated (dd/mm/yyyy)": "29/09/2023", "Operator (or Applicant)": "RE Projects Development", "Site Name": "Persley Croft - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Persley Croft ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB22 8AN", "X-coordinate": "391167", "Y-coordinate": "810175", "Planning Authority": "Aberdeen Council", "Planning Application Reference": "231134/DPP", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "12/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.182309", "long": "-2.147753", "status": "planning", "mw": 49, "ext_id": "13684"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13684", "Record Last Updated (dd/mm/yyyy)": "29/09/2023", "Operator (or Applicant)": "RE Projects Development", "Site Name": "Persley Croft - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Persley Croft ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB22 8AN", "X-coordinate": "391167", "Y-coordinate": "810175", "Planning Authority": "Aberdeen Council", "Planning Application Reference": "231134/DPP", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "12/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.182309", "long": "-2.147753", "status": "planning", "mw": 49, "ext_id": "13684"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Persley Croft - Battery Storage", "name_short": "Persley Croft", "owner": "RE Projects Development", "state": "scotland", "country": "uk", "lat": "57.182309", "long": "-2.147753", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.182309+-2.147753", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "city": "", "id": "1211", "external_id": "13695", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1211", "external_id": "13695", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "external_id": "13695", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 75, "power_mw": 75, "owner": "Exagen", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.366093", "long": "-1.619303", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13695", "Record Last Updated (dd/mm/yyyy)": "06/10/2023", "Operator (or Applicant)": "Exagen", "Site Name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13694", "Installed Capacity (MWelec)": "75", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Holly Lane Energy Park", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B37 7AN", "X-coordinate": "426019", "Y-coordinate": "274295", "Planning Authority": "Warwick District Council", "Planning Application Reference": "W/23/1358", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.366093", "long": "-1.619303", "status": "planning", "mw": 75, "ext_id": "13695"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13695", "Record Last Updated (dd/mm/yyyy)": "06/10/2023", "Operator (or Applicant)": "Exagen", "Site Name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13694", "Installed Capacity (MWelec)": "75", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Holly Lane Energy Park", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B37 7AN", "X-coordinate": "426019", "Y-coordinate": "274295", "Planning Authority": "Warwick District Council", "Planning Application Reference": "W/23/1358", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.366093", "long": "-1.619303", "status": "planning", "mw": 75, "ext_id": "13695"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 75, "mwh_is_estimate": true, "mwh": 75, "mwh_estimate": 75, "status": "planning", "status_class": "", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "name_short": "Holly Lane Energy Park - Solar Farm...", "owner": "Exagen", "state": "west midlands", "country": "uk", "lat": "52.366093", "long": "-1.619303", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.366093+-1.619303", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Belasis Avenue - Battery Storage", "city": "", "id": "1212", "external_id": "13850", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Story Construction Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1212", "external_id": "13850", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Belasis Avenue - Battery Storage", "external_id": "13850", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 75, "power_mw": 75, "owner": "Story Construction Limited", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.599425", "long": "-1.263916", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "13850", "Record Last Updated (dd/mm/yyyy)": "04/09/2023", "Operator (or Applicant)": "Story Construction Limited", "Site Name": "Belasis Avenue - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "75", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "South Side Of Belasis Avenue", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS23 1LQ", "X-coordinate": "447653", "Y-coordinate": "522943", "Planning Authority": "Stockton-on-Tees Borough Council", "Planning Application Reference": "23/1634/FUL ", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.599425", "long": "-1.263916", "status": "planning", "mw": 75, "ext_id": "13850"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "13850", "Record Last Updated (dd/mm/yyyy)": "04/09/2023", "Operator (or Applicant)": "Story Construction Limited", "Site Name": "Belasis Avenue - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "75", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "South Side Of Belasis Avenue", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS23 1LQ", "X-coordinate": "447653", "Y-coordinate": "522943", "Planning Authority": "Stockton-on-Tees Borough Council", "Planning Application Reference": "23/1634/FUL ", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.599425", "long": "-1.263916", "status": "planning", "mw": 75, "ext_id": "13850"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 75, "mwh_is_estimate": true, "mwh": 75, "mwh_estimate": 75, "status": "planning", "status_class": "", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Belasis Avenue - Battery Storage", "name_short": "Belasis Avenue", "owner": "Story Construction Limited", "state": "north east", "country": "uk", "lat": "54.599425", "long": "-1.263916", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.599425+-1.263916", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bradley Road - Battery Energy Storage System", "city": "", "id": "1213", "external_id": "13863", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Renewable Connections Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1213", "external_id": "13863", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bradley Road - Battery Energy Storage System", "external_id": "13863", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Renewable Connections Developments Limited", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.546455", "long": "-0.122768", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13863", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Renewable Connections Developments Limited", "Site Name": "Bradley Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13862", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Bradley Road, Grimsby ", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN37 0AG", "X-coordinate": "524480", "Y-coordinate": "407174", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/1156/23/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.546455", "long": "-0.122768", "status": "planning", "mw": 10, "ext_id": "13863"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13863", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Renewable Connections Developments Limited", "Site Name": "Bradley Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13862", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Bradley Road, Grimsby ", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN37 0AG", "X-coordinate": "524480", "Y-coordinate": "407174", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/1156/23/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.546455", "long": "-0.122768", "status": "planning", "mw": 10, "ext_id": "13863"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bradley Road - Battery Energy Storage System", "name_short": "Bradley Road - Battery", "owner": "Renewable Connections Developments Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.546455", "long": "-0.122768", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.546455+-0.122768", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "city": "", "id": "1214", "external_id": "13949", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Infinergy Limited / Boralex", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1214", "external_id": "13949", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "external_id": "13949", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Infinergy Limited / Boralex", "status": "planning", "date_first_heard": "2023-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.552425", "long": "-4.059429", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13949", "Record Last Updated (dd/mm/yyyy)": "24/10/2023", "Operator (or Applicant)": "Infinergy Limited / Boralex", "Site Name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South West Of Loch Toftingall, East Of The A9 & North Of Halsary Wind Farm", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7SB", "X-coordinate": "280257", "Y-coordinate": "964544", "Planning Authority": "Highland Council", "Planning Application Reference": "23/04690/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.552425", "long": "-4.059429", "status": "planning", "mw": 49, "ext_id": "13949"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13949", "Record Last Updated (dd/mm/yyyy)": "24/10/2023", "Operator (or Applicant)": "Infinergy Limited / Boralex", "Site Name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South West Of Loch Toftingall, East Of The A9 & North Of Halsary Wind Farm", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7SB", "X-coordinate": "280257", "Y-coordinate": "964544", "Planning Authority": "Highland Council", "Planning Application Reference": "23/04690/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.552425", "long": "-4.059429", "status": "planning", "mw": 49, "ext_id": "13949"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "name_short": "Loch Toftingall, Halsary Wind Farm", "owner": "Infinergy Limited / Boralex", "state": "scotland", "country": "uk", "lat": "58.552425", "long": "-4.059429", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.552425+-4.059429", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "city": "", "id": "1215", "external_id": "13985", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Queequeg Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1215", "external_id": "13985", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "external_id": "13985", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Queequeg Renewables Limited", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.408054", "long": "-2.117233", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13985", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Queequeg Renewables Limited", "Site Name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Goyt Hall Farm Goyt Valley Footpath Bredbury Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 3LH", "X-coordinate": "392304", "Y-coordinate": "390144", "Planning Authority": "Stockport Metropolitan Borough council", "Planning Application Reference": "DC/090340", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.408054", "long": "-2.117233", "status": "planning", "mw": 40, "ext_id": "13985"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13985", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Queequeg Renewables Limited", "Site Name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Goyt Hall Farm Goyt Valley Footpath Bredbury Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 3LH", "X-coordinate": "392304", "Y-coordinate": "390144", "Planning Authority": "Stockport Metropolitan Borough council", "Planning Application Reference": "DC/090340", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.408054", "long": "-2.117233", "status": "planning", "mw": 40, "ext_id": "13985"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "name_short": "Goyt Hall Farm, Goyt Valley Footpat...", "owner": "Queequeg Renewables Limited", "state": "north west", "country": "uk", "lat": "53.408054", "long": "-2.117233", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.408054+-2.117233", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bluebell Wood Solar Farm & Battery Storage", "city": "", "id": "1216", "external_id": "13989", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon UK Solar Investment Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1216", "external_id": "13989", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bluebell Wood Solar Farm & Battery Storage", "external_id": "13989", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Low Carbon UK Solar Investment Co Limited", "status": "planning", "date_first_heard": "2023-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.285019", "long": "-2.260271", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13989", "Record Last Updated (dd/mm/yyyy)": "20/11/2023", "Operator (or Applicant)": "Low Carbon UK Solar Investment Co Limited", "Site Name": "Bluebell Wood Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13988", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Flexham Farm, Bradford Road, Rode, Frome", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "BA14 9NE", "X-coordinate": "381945", "Y-coordinate": "154019", "Planning Authority": "Somerset County Council", "Planning Application Reference": "2023/2183/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.285019", "long": "-2.260271", "status": "planning", "mw": 50, "ext_id": "13989"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13989", "Record Last Updated (dd/mm/yyyy)": "20/11/2023", "Operator (or Applicant)": "Low Carbon UK Solar Investment Co Limited", "Site Name": "Bluebell Wood Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13988", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Flexham Farm, Bradford Road, Rode, Frome", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "BA14 9NE", "X-coordinate": "381945", "Y-coordinate": "154019", "Planning Authority": "Somerset County Council", "Planning Application Reference": "2023/2183/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.285019", "long": "-2.260271", "status": "planning", "mw": 50, "ext_id": "13989"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bluebell Wood Solar Farm & Battery Storage", "name_short": "Bluebell Wood Solar Farm &", "owner": "Low Carbon UK Solar Investment Co Limited", "state": "south west", "country": "uk", "lat": "51.285019", "long": "-2.260271", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.285019+-2.260271", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Weston Lane - Battery Storage Facility", "city": "", "id": "1217", "external_id": "14005", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1217", "external_id": "14005", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Weston Lane - Battery Storage Facility", "external_id": "14005", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anglo Renewables Limited", "status": "planning", "date_first_heard": "2024-01-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.892577", "long": "-1.356341", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14005", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Weston Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "\tLand At Weston Lane Nursling ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO19 9HX", "X-coordinate": "445367", "Y-coordinate": "110541", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "23/03055/FULLS", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.892577", "long": "-1.356341", "status": "planning", "mw": 49, "ext_id": "14005"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14005", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Weston Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "\tLand At Weston Lane Nursling ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO19 9HX", "X-coordinate": "445367", "Y-coordinate": "110541", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "23/03055/FULLS", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.892577", "long": "-1.356341", "status": "planning", "mw": 49, "ext_id": "14005"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2024-01-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Weston Lane - Battery Storage Facility", "name_short": "Weston Lane", "owner": "Anglo Renewables Limited", "state": "south east", "country": "uk", "lat": "50.892577", "long": "-1.356341", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.892577+-1.356341", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Balk, Almholme - Energy Storage System", "city": "", "id": "1218", "external_id": "14061", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1025", "power_mw": "1025", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1218", "external_id": "14061", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Balk, Almholme - Energy Storage System", "external_id": "14061", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 1025, "power_mw": 1025, "owner": "Innova Renewables", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.567083", "long": "-1.131339", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14061", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "The Balk, Almholme - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14060", "Installed Capacity (MWelec)": "1025", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The Balk, Almholme, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN5 0LL ", "X-coordinate": "457628", "Y-coordinate": "408181", "Planning Authority": "Doncaster Metropolitan Borough Council", "Planning Application Reference": "23/02482/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.567083", "long": "-1.131339", "status": "planning", "mw": 1025, "ext_id": "14061"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14061", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "The Balk, Almholme - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14060", "Installed Capacity (MWelec)": "1025", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The Balk, Almholme, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN5 0LL ", "X-coordinate": "457628", "Y-coordinate": "408181", "Planning Authority": "Doncaster Metropolitan Borough Council", "Planning Application Reference": "23/02482/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.567083", "long": "-1.131339", "status": "planning", "mw": 1025, "ext_id": "14061"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1025, "mwh_is_estimate": true, "mwh": 1025, "mwh_estimate": 1025, "status": "planning", "status_class": "", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Balk, Almholme - Energy Storage System", "name_short": "The Balk, Almholme", "owner": "Innova Renewables", "state": "yorkshire and humber", "country": "uk", "lat": "53.567083", "long": "-1.131339", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.567083+-1.131339", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Illeybrook Farm - Battery Energy Storage", "city": "", "id": "1219", "external_id": "14064", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Net Zero Eleven Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1219", "external_id": "14064", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Illeybrook Farm - Battery Energy Storage", "external_id": "14064", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Net Zero Eleven Limited", "status": "planning", "date_first_heard": "2023-08-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.434647", "long": "-2.036272", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14064", "Record Last Updated (dd/mm/yyyy)": "14/08/2023", "Operator (or Applicant)": "Net Zero Eleven Limited", "Site Name": "Illeybrook Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.8", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Illeybrook Farm, Illey Lane, Halesowen", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B62 0HE", "X-coordinate": "\t397631", "Y-coordinate": "\t281853", "Planning Authority": "Dudley Metropolitan Borough Council", "Planning Application Reference": "P23/0940", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.434647", "long": "-2.036272", "status": "planning", "mw": 99, "ext_id": "14064"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14064", "Record Last Updated (dd/mm/yyyy)": "14/08/2023", "Operator (or Applicant)": "Net Zero Eleven Limited", "Site Name": "Illeybrook Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.8", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Illeybrook Farm, Illey Lane, Halesowen", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B62 0HE", "X-coordinate": "\t397631", "Y-coordinate": "\t281853", "Planning Authority": "Dudley Metropolitan Borough Council", "Planning Application Reference": "P23/0940", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.434647", "long": "-2.036272", "status": "planning", "mw": 99, "ext_id": "14064"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-08-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Illeybrook Farm - Battery Energy Storage", "name_short": "Illeybrook Farm", "owner": "Net Zero Eleven Limited", "state": "west midlands", "country": "uk", "lat": "52.434647", "long": "-2.036272", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.434647+-2.036272", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chillington Estate, Chillington Park - Battery Storage", "city": "", "id": "1220", "external_id": "14088", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Elgin Energy Esco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1220", "external_id": "14088", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chillington Estate, Chillington Park - Battery Storage", "external_id": "14088", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Elgin Energy Esco Limited", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.658658", "long": "-2.203415", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14088", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Elgin Energy Esco Limited", "Site Name": "Chillington Estate, Chillington Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14087", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chillington Estate Chillington Park Chillington", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV8 1RE", "X-coordinate": "386338", "Y-coordinate": "306790", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00576/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.658658", "long": "-2.203415", "status": "planning", "mw": 40, "ext_id": "14088"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14088", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Elgin Energy Esco Limited", "Site Name": "Chillington Estate, Chillington Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14087", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chillington Estate Chillington Park Chillington", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV8 1RE", "X-coordinate": "386338", "Y-coordinate": "306790", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00576/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.658658", "long": "-2.203415", "status": "planning", "mw": 40, "ext_id": "14088"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chillington Estate, Chillington Park - Battery Storage", "name_short": "Chillington Estate, Chillington Par...", "owner": "Elgin Energy Esco Limited", "state": "west midlands", "country": "uk", "lat": "52.658658", "long": "-2.203415", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.658658+-2.203415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Enoch Hill, Dalmellington - Battery Storage", "city": "", "id": "1221", "external_id": "14090", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "11", "power_mw": "11", "customer": "", "owner": "RWE Renewables Uk Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1221", "external_id": "14090", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Enoch Hill, Dalmellington - Battery Storage", "external_id": "14090", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 11, "power_mw": 11, "owner": "RWE Renewables Uk Limited", "status": "planning", "date_first_heard": "2023-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.324802", "long": "-4.441643", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14090", "Record Last Updated (dd/mm/yyyy)": "28/09/2023", "Operator (or Applicant)": "RWE Renewables Uk Limited", "Site Name": "Enoch Hill, Dalmellington - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7769", "Installed Capacity (MWelec)": "11", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Enoch Hill, 2 Wind Farm, Dalmellington", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7QA", "X-coordinate": "245186", "Y-coordinate": "606131", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0469/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.324802", "long": "-4.441643", "status": "planning", "mw": 11, "ext_id": "14090"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14090", "Record Last Updated (dd/mm/yyyy)": "28/09/2023", "Operator (or Applicant)": "RWE Renewables Uk Limited", "Site Name": "Enoch Hill, Dalmellington - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7769", "Installed Capacity (MWelec)": "11", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Enoch Hill, 2 Wind Farm, Dalmellington", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7QA", "X-coordinate": "245186", "Y-coordinate": "606131", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0469/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.324802", "long": "-4.441643", "status": "planning", "mw": 11, "ext_id": "14090"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 11, "mwh_is_estimate": true, "mwh": 11, "mwh_estimate": 11, "status": "planning", "status_class": "", "date_first_heard": "2023-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Enoch Hill, Dalmellington - Battery Storage", "name_short": "Enoch Hill, Dalmellington", "owner": "RWE Renewables Uk Limited", "state": "scotland", "country": "uk", "lat": "55.324802", "long": "-4.441643", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.324802+-4.441643", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wardlaw Wood Windfarm - Battery Storage", "city": "", "id": "1222", "external_id": "14231", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Community Windpower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1222", "external_id": "14231", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wardlaw Wood Windfarm - Battery Storage", "external_id": "14231", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Community Windpower Limited", "status": "planning", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.723168", "long": "-4.753233", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14231", "Record Last Updated (dd/mm/yyyy)": "20/09/2023", "Operator (or Applicant)": "Community Windpower Limited", "Site Name": "Wardlaw Wood Windfarm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4691", "Installed Capacity (MWelec)": "19.99", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "East Of Wardlaw Wood Windfarm", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 5HR", "X-coordinate": "227179", "Y-coordinate": "651185", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00593/PP ", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "04/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.723168", "long": "-4.753233", "status": "planning", "mw": 19, "ext_id": "14231"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14231", "Record Last Updated (dd/mm/yyyy)": "20/09/2023", "Operator (or Applicant)": "Community Windpower Limited", "Site Name": "Wardlaw Wood Windfarm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4691", "Installed Capacity (MWelec)": "19.99", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "East Of Wardlaw Wood Windfarm", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 5HR", "X-coordinate": "227179", "Y-coordinate": "651185", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00593/PP ", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "04/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.723168", "long": "-4.753233", "status": "planning", "mw": 19, "ext_id": "14231"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wardlaw Wood Windfarm - Battery Storage", "name_short": "Wardlaw Wood Windfarm", "owner": "Community Windpower Limited", "state": "scotland", "country": "uk", "lat": "55.723168", "long": "-4.753233", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.723168+-4.753233", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Houston Solar PV Farm & Energy Storage Facility", "city": "", "id": "1223", "external_id": "14294", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "The Old Rectory", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1223", "external_id": "14294", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Houston Solar PV Farm & Energy Storage Facility", "external_id": "14294", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "The Old Rectory", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.867636", "long": "-4.550194", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14294", "Record Last Updated (dd/mm/yyyy)": "14/12/2023", "Operator (or Applicant)": "The Old Rectory", "Site Name": "Houston Solar PV Farm & Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14293", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Houston Village Hall, 19 Main Street, Houston, Johnstone", "County": "Renfrewshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA6 7EL", "X-coordinate": "240520", "Y-coordinate": "666770", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004825", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.867636", "long": "-4.550194", "status": "planning", "mw": 25, "ext_id": "14294"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14294", "Record Last Updated (dd/mm/yyyy)": "14/12/2023", "Operator (or Applicant)": "The Old Rectory", "Site Name": "Houston Solar PV Farm & Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14293", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Houston Village Hall, 19 Main Street, Houston, Johnstone", "County": "Renfrewshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA6 7EL", "X-coordinate": "240520", "Y-coordinate": "666770", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004825", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.867636", "long": "-4.550194", "status": "planning", "mw": 25, "ext_id": "14294"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Houston Solar PV Farm & Energy Storage Facility", "name_short": "Houston Solar PV Farm & Energy", "owner": "The Old Rectory", "state": "scotland", "country": "uk", "lat": "55.867636", "long": "-4.550194", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.867636+-4.550194", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Knockodhar Wind Farm", "city": "", "id": "1224", "external_id": "14296", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "REG Knockodhar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1224", "external_id": "14296", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Knockodhar Wind Farm", "external_id": "14296", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "REG Knockodhar Limited", "status": "planning", "date_first_heard": "2023-07-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.210802", "long": "-4.71116", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14296", "Record Last Updated (dd/mm/yyyy)": "14/07/2023", "Operator (or Applicant)": "REG Knockodhar Limited", "Site Name": "Knockodhar Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14295", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Knockodhar Wind Farm, 3.5 kilometres SW/O The Village Of Barr, Girvan", "County": "South Ayrshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26 9TW", "X-coordinate": "227597", "Y-coordinate": "594082", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002153", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.210802", "long": "-4.71116", "status": "planning", "mw": 20, "ext_id": "14296"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14296", "Record Last Updated (dd/mm/yyyy)": "14/07/2023", "Operator (or Applicant)": "REG Knockodhar Limited", "Site Name": "Knockodhar Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14295", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Knockodhar Wind Farm, 3.5 kilometres SW/O The Village Of Barr, Girvan", "County": "South Ayrshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26 9TW", "X-coordinate": "227597", "Y-coordinate": "594082", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002153", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.210802", "long": "-4.71116", "status": "planning", "mw": 20, "ext_id": "14296"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-07-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Knockodhar Wind Farm", "name_short": "Knockodhar Wind Farm", "owner": "REG Knockodhar Limited", "state": "scotland", "country": "uk", "lat": "55.210802", "long": "-4.71116", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.210802+-4.71116", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grendon Lakes, Grendon - Battery Storage Facility", "city": "", "id": "1225", "external_id": "14321", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1225", "external_id": "14321", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grendon Lakes, Grendon - Battery Storage Facility", "external_id": "14321", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2023-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.244024", "long": "-0.722824", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14321", "Record Last Updated (dd/mm/yyyy)": "19/07/2023", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes, Grendon - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10955", "Address": "Grendon Lakes, Main Road, Grendon, Northampton", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW", "X-coordinate": "487299", "Y-coordinate": "261417", "Planning Authority": "Wellingborough Borough Council", "Planning Application Reference": "NW/23/00360/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.244024", "long": "-0.722824", "status": "planning", "mw": 49, "ext_id": "14321"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14321", "Record Last Updated (dd/mm/yyyy)": "19/07/2023", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes, Grendon - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10955", "Address": "Grendon Lakes, Main Road, Grendon, Northampton", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW", "X-coordinate": "487299", "Y-coordinate": "261417", "Planning Authority": "Wellingborough Borough Council", "Planning Application Reference": "NW/23/00360/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.244024", "long": "-0.722824", "status": "planning", "mw": 49, "ext_id": "14321"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grendon Lakes, Grendon - Battery Storage Facility", "name_short": "Grendon Lakes, Grendon", "owner": "Statera Energy", "state": "east midlands", "country": "uk", "lat": "52.244024", "long": "-0.722824", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.244024+-0.722824", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Denfield Farm", "city": "", "id": "1226", "external_id": "14341", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Seahills Properties Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1226", "external_id": "14341", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Denfield Farm", "external_id": "14341", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Seahills Properties Limited", "status": "planning", "date_first_heard": "2024-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.565491", "long": "-2.619013", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14341", "Record Last Updated (dd/mm/yyyy)": "10/01/2024", "Operator (or Applicant)": "Seahills Properties Limited", "Site Name": "Denfield Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7163", "Address": "Land To East Of Crudie Acre Co, Arbroath, Tayside", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD11 3ET", "X-coordinate": "362057", "Y-coordinate": "741675", "Planning Authority": "Angus Council", "Planning Application Reference": "23/00285/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2024", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.565491", "long": "-2.619013", "status": "planning", "mw": 20, "ext_id": "14341"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14341", "Record Last Updated (dd/mm/yyyy)": "10/01/2024", "Operator (or Applicant)": "Seahills Properties Limited", "Site Name": "Denfield Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7163", "Address": "Land To East Of Crudie Acre Co, Arbroath, Tayside", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD11 3ET", "X-coordinate": "362057", "Y-coordinate": "741675", "Planning Authority": "Angus Council", "Planning Application Reference": "23/00285/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2024", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.565491", "long": "-2.619013", "status": "planning", "mw": 20, "ext_id": "14341"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2024-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Denfield Farm", "name_short": "Denfield Farm", "owner": "Seahills Properties Limited", "state": "scotland", "country": "uk", "lat": "56.565491", "long": "-2.619013", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.565491+-2.619013", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bywater, Kippax - Battery Energy Storage", "city": "", "id": "1227", "external_id": "14362", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Barnsdale Solar Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1227", "external_id": "14362", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bywater, Kippax - Battery Energy Storage", "external_id": "14362", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Barnsdale Solar Park Limited", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.750604", "long": "-1.360494", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14362", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "Barnsdale Solar Park Limited", "Site Name": "Bywater, Kippax - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bywater To The W/O The A656 The N/O Allerton Bywater, S/O Kippax, Leeds", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF10 2FX", "X-coordinate": "442268", "Y-coordinate": "428438", "Planning Authority": "Leeds City Council", "Planning Application Reference": "23/03233/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.750604", "long": "-1.360494", "status": "planning", "mw": 40, "ext_id": "14362"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14362", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "Barnsdale Solar Park Limited", "Site Name": "Bywater, Kippax - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bywater To The W/O The A656 The N/O Allerton Bywater, S/O Kippax, Leeds", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF10 2FX", "X-coordinate": "442268", "Y-coordinate": "428438", "Planning Authority": "Leeds City Council", "Planning Application Reference": "23/03233/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.750604", "long": "-1.360494", "status": "planning", "mw": 40, "ext_id": "14362"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bywater, Kippax - Battery Energy Storage", "name_short": "Bywater, Kippax", "owner": "Barnsdale Solar Park Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.750604", "long": "-1.360494", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.750604+-1.360494", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "city": "", "id": "1228", "external_id": "14373", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1228", "external_id": "14373", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "external_id": "14373", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Renewables", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.469701", "long": "-4.507613", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14373", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": "8248", "Address": "SW Of Platchaig House Kilmorack Beauly", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV4 7AL", "X-coordinate": "249707", "Y-coordinate": "844935", "Planning Authority": "Highland Council", "Planning Application Reference": "23/03113/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.469701", "long": "-4.507613", "status": "planning", "mw": 49, "ext_id": "14373"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14373", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": "8248", "Address": "SW Of Platchaig House Kilmorack Beauly", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV4 7AL", "X-coordinate": "249707", "Y-coordinate": "844935", "Planning Authority": "Highland Council", "Planning Application Reference": "23/03113/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.469701", "long": "-4.507613", "status": "planning", "mw": 49, "ext_id": "14373"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "name_short": "Caulternich Croft Energy Storage Pr...", "owner": "Whirlwind Renewables", "state": "scotland", "country": "uk", "lat": "57.469701", "long": "-4.507613", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.469701+-4.507613", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kintore Substation, Leylodge - Battery Energy Storage", "city": "", "id": "1229", "external_id": "14374", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "XRE Gamma Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1229", "external_id": "14374", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kintore Substation, Leylodge - Battery Energy Storage", "external_id": "14374", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "XRE Gamma Limited", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.218628", "long": "-2.375657", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14374", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "XRE Gamma Limited", "Site Name": "Kintore Substation, Leylodge - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The E/O Kintore Substation, Leylodge, Kintore, Inverurie", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XY", "X-coordinate": "377412", "Y-coordinate": "814271", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/1234", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.218628", "long": "-2.375657", "status": "planning", "mw": 49, "ext_id": "14374"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14374", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "XRE Gamma Limited", "Site Name": "Kintore Substation, Leylodge - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The E/O Kintore Substation, Leylodge, Kintore, Inverurie", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XY", "X-coordinate": "377412", "Y-coordinate": "814271", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/1234", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.218628", "long": "-2.375657", "status": "planning", "mw": 49, "ext_id": "14374"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kintore Substation, Leylodge - Battery Energy Storage", "name_short": "Kintore Substation, Leylodge", "owner": "XRE Gamma Limited", "state": "scotland", "country": "uk", "lat": "57.218628", "long": "-2.375657", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.218628+-2.375657", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Seath Road, Rutherglen - Battery Storage", "city": "", "id": "1230", "external_id": "14378", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1230", "external_id": "14378", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Seath Road, Rutherglen - Battery Storage", "external_id": "14378", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Green Power Consultants", "status": "planning", "date_first_heard": "2023-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.833638", "long": "-4.217595", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14378", "Record Last Updated (dd/mm/yyyy)": "12/10/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Seath Road, Rutherglen - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "50", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Southeast Side of Seath Road Rutherglen", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G73 1RW", "X-coordinate": "261207", "Y-coordinate": "662270", "Planning Authority": "South Lanarkshire council", "Planning Application Reference": "P/23/1214", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "21/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.833638", "long": "-4.217595", "status": "planning", "mw": 50, "ext_id": "14378"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14378", "Record Last Updated (dd/mm/yyyy)": "12/10/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Seath Road, Rutherglen - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "50", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Southeast Side of Seath Road Rutherglen", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G73 1RW", "X-coordinate": "261207", "Y-coordinate": "662270", "Planning Authority": "South Lanarkshire council", "Planning Application Reference": "P/23/1214", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "21/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.833638", "long": "-4.217595", "status": "planning", "mw": 50, "ext_id": "14378"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Seath Road, Rutherglen - Battery Storage", "name_short": "Seath Road, Rutherglen", "owner": "Green Power Consultants", "state": "scotland", "country": "uk", "lat": "55.833638", "long": "-4.217595", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.833638+-4.217595", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fanny House Farm, Bay Gateway - Battery Storage", "city": "", "id": "1231", "external_id": "14386", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "940", "power_mw": "940", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1231", "external_id": "14386", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fanny House Farm, Bay Gateway - Battery Storage", "external_id": "14386", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 940, "power_mw": 940, "owner": "Innova Renewables", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.051855", "long": "-2.878072", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14386", "Record Last Updated (dd/mm/yyyy)": "01/12/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "Fanny House Farm, Bay Gateway - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "940", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fanny House Farm, Heaton With Oxcliffe, Morcambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3EF", "X-coordinate": "342611", "Y-coordinate": "462123", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "23/00749/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/11/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.051855", "long": "-2.878072", "status": "planning", "mw": 940, "ext_id": "14386"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14386", "Record Last Updated (dd/mm/yyyy)": "01/12/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "Fanny House Farm, Bay Gateway - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "940", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fanny House Farm, Heaton With Oxcliffe, Morcambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3EF", "X-coordinate": "342611", "Y-coordinate": "462123", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "23/00749/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/11/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.051855", "long": "-2.878072", "status": "planning", "mw": 940, "ext_id": "14386"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 940, "mwh_is_estimate": true, "mwh": 940, "mwh_estimate": 940, "status": "planning", "status_class": "", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fanny House Farm, Bay Gateway - Battery Storage", "name_short": "Fanny House Farm, Bay Gateway", "owner": "Innova Renewables", "state": "north west", "country": "uk", "lat": "54.051855", "long": "-2.878072", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.051855+-2.878072", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Boldon Substation - Battery Energy Storage", "city": "", "id": "1232", "external_id": "14408", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1232", "external_id": "14408", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Boldon Substation - Battery Energy Storage", "external_id": "14408", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Whirlwind Energy Storage Limited", "status": "planning", "date_first_heard": "2023-07-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.938936", "long": "-1.467373", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14408", "Record Last Updated (dd/mm/yyyy)": "26/07/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "West Boldon Substation - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East of the West Boldon Substation, 400 metres south of the A184 and 300m East of the A189 in South Tyneside ", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE35 9PE", "X-coordinate": "434222", "Y-coordinate": "560604", "Planning Authority": "South Tyneside Council", "Planning Application Reference": "ST/0486/23/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.938936", "long": "-1.467373", "status": "planning", "mw": 60, "ext_id": "14408"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14408", "Record Last Updated (dd/mm/yyyy)": "26/07/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "West Boldon Substation - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East of the West Boldon Substation, 400 metres south of the A184 and 300m East of the A189 in South Tyneside ", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE35 9PE", "X-coordinate": "434222", "Y-coordinate": "560604", "Planning Authority": "South Tyneside Council", "Planning Application Reference": "ST/0486/23/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.938936", "long": "-1.467373", "status": "planning", "mw": 60, "ext_id": "14408"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-07-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Boldon Substation - Battery Energy Storage", "name_short": "West Boldon Substation", "owner": "Whirlwind Energy Storage Limited", "state": "north east", "country": "uk", "lat": "54.938936", "long": "-1.467373", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.938936+-1.467373", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "city": "", "id": "1233", "external_id": "14461", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Connections Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1233", "external_id": "14461", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "external_id": "14461", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Renewable Connections Development Limited", "status": "planning", "date_first_heard": "2023-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.394089", "long": "-4.899253", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14461", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Renewable Connections Development Limited", "Site Name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10058", "Address": "Indian Queens Sub-station, B3279 From Gaverigan To Carne Hill, St Dennis, St Austell", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194029", "Y-coordinate": "58931", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/04504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.394089", "long": "-4.899253", "status": "planning", "mw": 50, "ext_id": "14461"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14461", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Renewable Connections Development Limited", "Site Name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10058", "Address": "Indian Queens Sub-station, B3279 From Gaverigan To Carne Hill, St Dennis, St Austell", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194029", "Y-coordinate": "58931", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/04504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.394089", "long": "-4.899253", "status": "planning", "mw": 50, "ext_id": "14461"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "name_short": "Indian Queens Sub station, Carne Hi...", "owner": "Renewable Connections Development Limited", "state": "south west", "country": "uk", "lat": "50.394089", "long": "-4.899253", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.394089+-4.899253", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ebstree Road, Trysull - Battery Energy Storage", "city": "", "id": "1234", "external_id": "14497", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Bengrove Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1234", "external_id": "14497", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ebstree Road, Trysull - Battery Energy Storage", "external_id": "14497", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Bengrove Bess Limited", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.559161", "long": "-2.222366", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14497", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Bengrove Bess Limited", "Site Name": "Ebstree Road, Trysull - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Ebstree Road Trysull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV5 7JE", "X-coordinate": "385022", "Y-coordinate": "295726", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00980/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.559161", "long": "-2.222366", "status": "planning", "mw": 49, "ext_id": "14497"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14497", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Bengrove Bess Limited", "Site Name": "Ebstree Road, Trysull - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Ebstree Road Trysull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV5 7JE", "X-coordinate": "385022", "Y-coordinate": "295726", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00980/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.559161", "long": "-2.222366", "status": "planning", "mw": 49, "ext_id": "14497"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ebstree Road, Trysull - Battery Energy Storage", "name_short": "Ebstree Road, Trysull", "owner": "Bengrove Bess Limited", "state": "west midlands", "country": "uk", "lat": "52.559161", "long": "-2.222366", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.559161+-2.222366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "1235", "external_id": "14510", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo ES Berkswell Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1235", "external_id": "14510", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "external_id": "14510", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anglo ES Berkswell Limited", "status": "planning", "date_first_heard": "2023-08-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.389808", "long": "-1.615984", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14510", "Record Last Updated (dd/mm/yyyy)": "07/08/2023", "Operator (or Applicant)": "Anglo ES Berkswell Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hodgetts Lane Berkswell ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426231", "Y-coordinate": "276934", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2023/01595/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.389808", "long": "-1.615984", "status": "planning", "mw": 49, "ext_id": "14510"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14510", "Record Last Updated (dd/mm/yyyy)": "07/08/2023", "Operator (or Applicant)": "Anglo ES Berkswell Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hodgetts Lane Berkswell ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426231", "Y-coordinate": "276934", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2023/01595/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.389808", "long": "-1.615984", "status": "planning", "mw": 49, "ext_id": "14510"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-08-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "name_short": "Hodgetts Lane, Berkswell - Electric...", "owner": "Anglo ES Berkswell Limited", "state": "west midlands", "country": "uk", "lat": "52.389808", "long": "-1.615984", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.389808+-1.615984", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Meiklelaught Farm - Battery Storage", "city": "", "id": "1236", "external_id": "14525", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1236", "external_id": "14525", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Meiklelaught Farm - Battery Storage", "external_id": "14525", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Green Power Consultants", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.667584", "long": "-4.76865", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14525", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Meiklelaught Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Meiklelaught Farm, Saltcoats", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA21 6NF", "X-coordinate": "225964", "Y-coordinate": "645040", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00731/PPM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.667584", "long": "-4.76865", "status": "planning", "mw": 30, "ext_id": "14525"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14525", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Meiklelaught Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Meiklelaught Farm, Saltcoats", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA21 6NF", "X-coordinate": "225964", "Y-coordinate": "645040", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00731/PPM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.667584", "long": "-4.76865", "status": "planning", "mw": 30, "ext_id": "14525"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Meiklelaught Farm - Battery Storage", "name_short": "Meiklelaught Farm", "owner": "Green Power Consultants", "state": "scotland", "country": "uk", "lat": "55.667584", "long": "-4.76865", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.667584+-4.76865", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dunside Wind Farm", "city": "", "id": "1237", "external_id": "14531", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1237", "external_id": "14531", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dunside Wind Farm", "external_id": "14531", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "EDF Energy", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.815517", "long": "-2.563469", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14531", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "EDF Energy", "Site Name": "Dunside Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10865", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Dunside Longformacus Duns ", "County": "Scottish Borders ", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD11 3PF", "X-coordinate": "364788", "Y-coordinate": "658172", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003436", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.815517", "long": "-2.563469", "status": "planning", "mw": 20, "ext_id": "14531"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14531", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "EDF Energy", "Site Name": "Dunside Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10865", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Dunside Longformacus Duns ", "County": "Scottish Borders ", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD11 3PF", "X-coordinate": "364788", "Y-coordinate": "658172", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003436", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.815517", "long": "-2.563469", "status": "planning", "mw": 20, "ext_id": "14531"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dunside Wind Farm", "name_short": "Dunside Wind Farm", "owner": "EDF Energy", "state": "scotland", "country": "uk", "lat": "55.815517", "long": "-2.563469", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.815517+-2.563469", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bodinglee Wind Farm", "city": "", "id": "1238", "external_id": "14532", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "106", "power_mw": "106", "customer": "", "owner": "Banks Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1238", "external_id": "14532", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bodinglee Wind Farm", "external_id": "14532", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 106, "power_mw": 106, "owner": "Banks Group", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.533406", "long": "-3.826254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14532", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Banks Group", "Site Name": "Bodinglee Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13638", "Installed Capacity (MWelec)": "106", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bodinglee Road, Wiston, Biggar", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML12 6HU", "X-coordinate": "284834", "Y-coordinate": "628146", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004839", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.533406", "long": "-3.826254", "status": "planning", "mw": 106, "ext_id": "14532"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14532", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Banks Group", "Site Name": "Bodinglee Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13638", "Installed Capacity (MWelec)": "106", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bodinglee Road, Wiston, Biggar", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML12 6HU", "X-coordinate": "284834", "Y-coordinate": "628146", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004839", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.533406", "long": "-3.826254", "status": "planning", "mw": 106, "ext_id": "14532"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 106, "mwh_is_estimate": true, "mwh": 106, "mwh_estimate": 106, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bodinglee Wind Farm", "name_short": "Bodinglee Wind Farm", "owner": "Banks Group", "state": "scotland", "country": "uk", "lat": "55.533406", "long": "-3.826254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.533406+-3.826254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rivox Wind Farm - Wind farm", "city": "", "id": "1239", "external_id": "14533", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1239", "external_id": "14533", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rivox Wind Farm - Wind farm", "external_id": "14533", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 90, "power_mw": 90, "owner": "Belltown Power Limited", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.384388", "long": "-3.760322", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14533", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Rivox Wind Farm - Wind farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9317", "Installed Capacity (MWelec)": "90", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rivox Wind Farm Lowther Hills West Of Moffat", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "288575", "Y-coordinate": "611457", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003293", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.384388", "long": "-3.760322", "status": "planning", "mw": 90, "ext_id": "14533"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14533", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Rivox Wind Farm - Wind farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9317", "Installed Capacity (MWelec)": "90", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rivox Wind Farm Lowther Hills West Of Moffat", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "288575", "Y-coordinate": "611457", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003293", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.384388", "long": "-3.760322", "status": "planning", "mw": 90, "ext_id": "14533"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 90, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rivox Wind Farm - Wind farm", "name_short": "Rivox Wind Farm - Wind farm", "owner": "Belltown Power Limited", "state": "scotland", "country": "uk", "lat": "55.384388", "long": "-3.760322", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.384388+-3.760322", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "city": "", "id": "1240", "external_id": "14597", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1240", "external_id": "14597", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "external_id": "14597", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Shaw-Energi Limited", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.619161", "long": "-2.216007", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14597", "Record Last Updated (dd/mm/yyyy)": "18/08/2023", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "57", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": "12187", "Address": "The Rake, Lower Jowkin Lane & Furbarn Road, Rochdale", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 5QR", "X-coordinate": "385809", "Y-coordinate": "413646", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "23/00816/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "25/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.619161", "long": "-2.216007", "status": "planning", "mw": 57, "ext_id": "14597"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14597", "Record Last Updated (dd/mm/yyyy)": "18/08/2023", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "57", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": "12187", "Address": "The Rake, Lower Jowkin Lane & Furbarn Road, Rochdale", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 5QR", "X-coordinate": "385809", "Y-coordinate": "413646", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "23/00816/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "25/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.619161", "long": "-2.216007", "status": "planning", "mw": 57, "ext_id": "14597"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "name_short": "The Rake, Lower Jowkin Lane", "owner": "Shaw-Energi Limited", "state": "north west", "country": "uk", "lat": "53.619161", "long": "-2.216007", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.619161+-2.216007", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walshaw House, Regent Street - Battery Energy Storage", "city": "", "id": "1241", "external_id": "14625", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "R B Business Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1241", "external_id": "14625", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walshaw House, Regent Street - Battery Energy Storage", "external_id": "14625", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "R B Business Park Limited", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.849027", "long": "-2.20275", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14625", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "R B Business Park Limited", "Site Name": "Walshaw House, Regent Street - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Walshaw House, Regent Street, Nelson", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB9 8AS", "X-coordinate": "386759", "Y-coordinate": "439218", "Planning Authority": "Pendle Borough Council", "Planning Application Reference": "23/0541/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.849027", "long": "-2.20275", "status": "planning", "mw": 100, "ext_id": "14625"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14625", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "R B Business Park Limited", "Site Name": "Walshaw House, Regent Street - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Walshaw House, Regent Street, Nelson", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB9 8AS", "X-coordinate": "386759", "Y-coordinate": "439218", "Planning Authority": "Pendle Borough Council", "Planning Application Reference": "23/0541/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.849027", "long": "-2.20275", "status": "planning", "mw": 100, "ext_id": "14625"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walshaw House, Regent Street - Battery Energy Storage", "name_short": "Walshaw House, Regent Street", "owner": "R B Business Park Limited", "state": "north west", "country": "uk", "lat": "53.849027", "long": "-2.20275", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.849027+-2.20275", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "city": "", "id": "1242", "external_id": "14638", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Chiltern Renewables Hockliffe Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1242", "external_id": "14638", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "external_id": "14638", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Chiltern Renewables Hockliffe Limited", "status": "planning", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.660315", "long": "-0.342571", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14638", "Record Last Updated (dd/mm/yyyy)": "05/12/2023", "Operator (or Applicant)": "Chiltern Renewables Hockliffe Limited", "Site Name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Elstree Substation, Hilfield Lane, Aldenham", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "WD25 8DT", "X-coordinate": "514739", "Y-coordinate": "197026", "Planning Authority": "Hertsmere Council", "Planning Application Reference": "23/1508/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.660315", "long": "-0.342571", "status": "planning", "mw": 400, "ext_id": "14638"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14638", "Record Last Updated (dd/mm/yyyy)": "05/12/2023", "Operator (or Applicant)": "Chiltern Renewables Hockliffe Limited", "Site Name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Elstree Substation, Hilfield Lane, Aldenham", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "WD25 8DT", "X-coordinate": "514739", "Y-coordinate": "197026", "Planning Authority": "Hertsmere Council", "Planning Application Reference": "23/1508/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.660315", "long": "-0.342571", "status": "planning", "mw": 400, "ext_id": "14638"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "name_short": "Elstree Substation, Hilfield Lane", "owner": "Chiltern Renewables Hockliffe Limited", "state": "eastern", "country": "uk", "lat": "51.660315", "long": "-0.342571", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.660315+-0.342571", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "New Barn Road - Battery Energy Storage Facility", "city": "", "id": "1243", "external_id": "14650", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Aton Energy Development (Northfleet) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1243", "external_id": "14650", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "New Barn Road - Battery Energy Storage Facility", "external_id": "14650", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Aton Energy Development (Northfleet) Limited", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.4208", "long": "0.311498", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14650", "Record Last Updated (dd/mm/yyyy)": "29/08/2023", "Operator (or Applicant)": "Aton Energy Development (Northfleet) Limited", "Site Name": "New Barn Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Side Of New Barn Road, Gravesend", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "DA13 9PA", "X-coordinate": "560817", "Y-coordinate": "171622", "Planning Authority": "Dartford Borough Council", "Planning Application Reference": "23/00863/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.4208", "long": "0.311498", "status": "planning", "mw": 35, "ext_id": "14650"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14650", "Record Last Updated (dd/mm/yyyy)": "29/08/2023", "Operator (or Applicant)": "Aton Energy Development (Northfleet) Limited", "Site Name": "New Barn Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Side Of New Barn Road, Gravesend", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "DA13 9PA", "X-coordinate": "560817", "Y-coordinate": "171622", "Planning Authority": "Dartford Borough Council", "Planning Application Reference": "23/00863/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.4208", "long": "0.311498", "status": "planning", "mw": 35, "ext_id": "14650"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "New Barn Road - Battery Energy Storage Facility", "name_short": "New Barn Road - Battery Energy", "owner": "Aton Energy Development (Northfleet) Limited", "state": "south east", "country": "uk", "lat": "51.4208", "long": "0.311498", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.4208+0.311498", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coopers Lane, Kirkby - Battery Storage Facility", "city": "", "id": "1244", "external_id": "14670", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1244", "external_id": "14670", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coopers Lane, Kirkby - Battery Storage Facility", "external_id": "14670", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.467913", "long": "-2.850394", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14670", "Record Last Updated (dd/mm/yyyy)": "29/08/2023", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Coopers Lane, Kirkby - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coopers Lane, Kirkby, Liverpool", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L33 7TT", "X-coordinate": "343645", "Y-coordinate": "397134", "Planning Authority": "Knowsley Metropolitan Borough Council", "Planning Application Reference": "23/02008/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.467913", "long": "-2.850394", "status": "planning", "mw": 49, "ext_id": "14670"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14670", "Record Last Updated (dd/mm/yyyy)": "29/08/2023", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Coopers Lane, Kirkby - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coopers Lane, Kirkby, Liverpool", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L33 7TT", "X-coordinate": "343645", "Y-coordinate": "397134", "Planning Authority": "Knowsley Metropolitan Borough Council", "Planning Application Reference": "23/02008/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.467913", "long": "-2.850394", "status": "planning", "mw": 49, "ext_id": "14670"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coopers Lane, Kirkby - Battery Storage Facility", "name_short": "Coopers Lane, Kirkby", "owner": "Pelagic Energy", "state": "north west", "country": "uk", "lat": "53.467913", "long": "-2.850394", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.467913+-2.850394", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "city": "", "id": "1245", "external_id": "14687", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Renewables (merged with Pivot Power)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1245", "external_id": "14687", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "external_id": "14687", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "EDF Energy Renewables (merged with Pivot Power)", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.396753", "long": "-4.900274", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14687", "Record Last Updated (dd/mm/yyyy)": "01/09/2023", "Operator (or Applicant)": "EDF Energy Renewables (merged with Pivot Power)", "Site Name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10058", "Address": "Indian Queens National Grid Substation Domelick Hill, B3279 St Dennis ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "193968", "Y-coordinate": "59230", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/06527\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.396753", "long": "-4.900274", "status": "planning", "mw": 50, "ext_id": "14687"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14687", "Record Last Updated (dd/mm/yyyy)": "01/09/2023", "Operator (or Applicant)": "EDF Energy Renewables (merged with Pivot Power)", "Site Name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10058", "Address": "Indian Queens National Grid Substation Domelick Hill, B3279 St Dennis ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "193968", "Y-coordinate": "59230", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/06527\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.396753", "long": "-4.900274", "status": "planning", "mw": 50, "ext_id": "14687"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "name_short": "Indian Queens National Grid Substat...", "owner": "EDF Energy Renewables (merged with Pivot Power)", "state": "south west", "country": "uk", "lat": "50.396753", "long": "-4.900274", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.396753+-4.900274", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "city": "", "id": "1246", "external_id": "14691", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1246", "external_id": "14691", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "external_id": "14691", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anglo Renewables", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.565944", "long": "-2.481742", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14691", "Record Last Updated (dd/mm/yyyy)": "01/09/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Between Larks Lane And Latteridge Lane Latteridge ", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TY", "X-coordinate": "366705", "Y-coordinate": "185340", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/02270/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.565944", "long": "-2.481742", "status": "planning", "mw": 49, "ext_id": "14691"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14691", "Record Last Updated (dd/mm/yyyy)": "01/09/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Between Larks Lane And Latteridge Lane Latteridge ", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TY", "X-coordinate": "366705", "Y-coordinate": "185340", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/02270/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.565944", "long": "-2.481742", "status": "planning", "mw": 49, "ext_id": "14691"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "name_short": "Larks Lane & Latteridge Lane, Latte...", "owner": "Anglo Renewables", "state": "south west", "country": "uk", "lat": "51.565944", "long": "-2.481742", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.565944+-2.481742", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tofts - Battery Storage", "city": "", "id": "1247", "external_id": "14706", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Telford Three Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1247", "external_id": "14706", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tofts - Battery Storage", "external_id": "14706", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Telford Three Limited", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.708996", "long": "-4.711909", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14706", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "Telford Three Limited", "Site Name": "Tofts - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Site Of Former Bridgend Mill Tofts", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 5AS", "X-coordinate": "229712", "Y-coordinate": "649506", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00396/PPP", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "05/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.708996", "long": "-4.711909", "status": "planning", "mw": 19, "ext_id": "14706"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14706", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "Telford Three Limited", "Site Name": "Tofts - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Site Of Former Bridgend Mill Tofts", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 5AS", "X-coordinate": "229712", "Y-coordinate": "649506", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00396/PPP", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "05/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.708996", "long": "-4.711909", "status": "planning", "mw": 19, "ext_id": "14706"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tofts - Battery Storage", "name_short": "Tofts", "owner": "Telford Three Limited", "state": "scotland", "country": "uk", "lat": "55.708996", "long": "-4.711909", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.708996+-4.711909", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barlow Road, Barlow Road - Battery Storage", "city": "", "id": "1248", "external_id": "14715", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1248", "external_id": "14715", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barlow Road, Barlow Road - Battery Storage", "external_id": "14715", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Vox Energy Limited", "status": "planning", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14715", "Record Last Updated (dd/mm/yyyy)": "06/09/2023", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12734", "Address": "Home Farm, Barlow Road, Barlow, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "ZG2023/0720/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 80, "ext_id": "14715"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14715", "Record Last Updated (dd/mm/yyyy)": "06/09/2023", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12734", "Address": "Home Farm, Barlow Road, Barlow, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "ZG2023/0720/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 80, "ext_id": "14715"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barlow Road, Barlow Road - Battery Storage", "name_short": "Barlow Road, Barlow Road", "owner": "Vox Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.773171+-1.057521", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wilton International, Greystones Road - Phase 1", "city": "", "id": "1249", "external_id": "14729", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "Sembcorp Utilities (UK) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1249", "external_id": "14729", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wilton International, Greystones Road - Phase 1", "external_id": "14729", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "Sembcorp Utilities (UK) Limited", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.572705", "long": "-1.129556", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14729", "Record Last Updated (dd/mm/yyyy)": "10/10/2023", "Operator (or Applicant)": "Sembcorp Utilities (UK) Limited", "Site Name": "Wilton International, Greystones Road - Phase 1", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wilton International, Lazenby", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8JH", "X-coordinate": "456370", "Y-coordinate": "520069", "Planning Authority": "Redcar & Cleveland Borough Council", "Planning Application Reference": "R/2023/0545/CL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572705", "long": "-1.129556", "status": "planning", "mw": 150, "ext_id": "14729"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14729", "Record Last Updated (dd/mm/yyyy)": "10/10/2023", "Operator (or Applicant)": "Sembcorp Utilities (UK) Limited", "Site Name": "Wilton International, Greystones Road - Phase 1", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wilton International, Lazenby", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8JH", "X-coordinate": "456370", "Y-coordinate": "520069", "Planning Authority": "Redcar & Cleveland Borough Council", "Planning Application Reference": "R/2023/0545/CL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572705", "long": "-1.129556", "status": "planning", "mw": 150, "ext_id": "14729"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wilton International, Greystones Road - Phase 1", "name_short": "Wilton International, Greystones Ro...", "owner": "Sembcorp Utilities (UK) Limited", "state": "north east", "country": "uk", "lat": "54.572705", "long": "-1.129556", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.572705+-1.129556", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Murton Way - Battery Energy Storage", "city": "", "id": "1250", "external_id": "14759", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "First Way Solar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1250", "external_id": "14759", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Murton Way - Battery Energy Storage", "external_id": "14759", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "First Way Solar Limited", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.894469", "long": "-0.97122", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14759", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "First Way Solar Limited", "Site Name": "Murton Way - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North W/O Murton Way, York", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO19 6AF", "X-coordinate": "467705", "Y-coordinate": "444745", "Planning Authority": "City of York Council", "Planning Application Reference": "23/02030/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.894469", "long": "-0.97122", "status": "planning", "mw": 100, "ext_id": "14759"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14759", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "First Way Solar Limited", "Site Name": "Murton Way - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North W/O Murton Way, York", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO19 6AF", "X-coordinate": "467705", "Y-coordinate": "444745", "Planning Authority": "City of York Council", "Planning Application Reference": "23/02030/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.894469", "long": "-0.97122", "status": "planning", "mw": 100, "ext_id": "14759"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Murton Way - Battery Energy Storage", "name_short": "Murton Way", "owner": "First Way Solar Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.894469", "long": "-0.97122", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.894469+-0.97122", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newarthill Energy Park", "city": "", "id": "1251", "external_id": "14763", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Geocore Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1251", "external_id": "14763", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newarthill Energy Park", "external_id": "14763", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 300, "power_mw": 300, "owner": "Geocore Limited", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.825376", "long": "-3.94311", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14763", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Geocore Limited", "Site Name": "Newarthill Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Legbrannock Road, Newarthill", "County": "Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML1 5SZ", "X-coordinate": "278370", "Y-coordinate": "660834", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004953", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.825376", "long": "-3.94311", "status": "planning", "mw": 300, "ext_id": "14763"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14763", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Geocore Limited", "Site Name": "Newarthill Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Legbrannock Road, Newarthill", "County": "Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML1 5SZ", "X-coordinate": "278370", "Y-coordinate": "660834", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004953", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.825376", "long": "-3.94311", "status": "planning", "mw": 300, "ext_id": "14763"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 300, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newarthill Energy Park", "name_short": "Newarthill Energy Park", "owner": "Geocore Limited", "state": "scotland", "country": "uk", "lat": "55.825376", "long": "-3.94311", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.825376+-3.94311", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kingston Road, Slimbridge - Battery Storage", "city": "", "id": "1252", "external_id": "14882", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Relay Slimbridge Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1252", "external_id": "14882", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kingston Road, Slimbridge - Battery Storage", "external_id": "14882", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 36, "power_mw": 36, "owner": "Relay Slimbridge Limited", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.736112", "long": "-2.384789", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14882", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "Relay Slimbridge Limited", "Site Name": "Kingston Road, Slimbridge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "11516", "Address": "Land North East Of Kingston Road Slimbridge \n", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7BN", "X-coordinate": "373525", "Y-coordinate": "204226", "Planning Authority": "Stroud Council", "Planning Application Reference": "S.23/1593/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.736112", "long": "-2.384789", "status": "planning", "mw": 36, "ext_id": "14882"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14882", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "Relay Slimbridge Limited", "Site Name": "Kingston Road, Slimbridge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "11516", "Address": "Land North East Of Kingston Road Slimbridge \n", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7BN", "X-coordinate": "373525", "Y-coordinate": "204226", "Planning Authority": "Stroud Council", "Planning Application Reference": "S.23/1593/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.736112", "long": "-2.384789", "status": "planning", "mw": 36, "ext_id": "14882"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 36, "mwh_is_estimate": true, "mwh": 36, "mwh_estimate": 36, "status": "planning", "status_class": "", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kingston Road, Slimbridge - Battery Storage", "name_short": "Kingston Road, Slimbridge", "owner": "Relay Slimbridge Limited", "state": "south west", "country": "uk", "lat": "51.736112", "long": "-2.384789", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.736112+-2.384789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wallerscote Limebeds - Battery Energy Storage", "city": "", "id": "1253", "external_id": "14888", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Infinis Solar Developments Limited / Green Earth Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1253", "external_id": "14888", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wallerscote Limebeds - Battery Energy Storage", "external_id": "14888", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Infinis Solar Developments Limited / Green Earth Developments", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.258296", "long": "-2.539917", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14888", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "Infinis Solar Developments Limited / Green Earth Developments", "Site Name": "Wallerscote Limebeds - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14887", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Winnington Avenue, Northwich", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW8 4ZE", "X-coordinate": "364079", "Y-coordinate": "373613", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "23/02766/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.258296", "long": "-2.539917", "status": "planning", "mw": 30, "ext_id": "14888"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14888", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "Infinis Solar Developments Limited / Green Earth Developments", "Site Name": "Wallerscote Limebeds - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14887", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Winnington Avenue, Northwich", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW8 4ZE", "X-coordinate": "364079", "Y-coordinate": "373613", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "23/02766/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.258296", "long": "-2.539917", "status": "planning", "mw": 30, "ext_id": "14888"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wallerscote Limebeds - Battery Energy Storage", "name_short": "Wallerscote Limebeds", "owner": "Infinis Solar Developments Limited / Green Earth Developments", "state": "north west", "country": "uk", "lat": "53.258296", "long": "-2.539917", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.258296+-2.539917", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Orrell Street Battery Energy Storage Facility", "city": "", "id": "1254", "external_id": "14892", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Enzygo Limited Environmental Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1254", "external_id": "14892", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Orrell Street Battery Energy Storage Facility", "external_id": "14892", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Enzygo Limited Environmental Consultants", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.541062", "long": "-2.624739", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14892", "Record Last Updated (dd/mm/yyyy)": "27/09/2023", "Operator (or Applicant)": "Enzygo Limited Environmental Consultants", "Site Name": "Orrell Street Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7724", "Address": "Site Of Former Council Depot Orrell Street ", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "WN1 3AB", "X-coordinate": "358696", "Y-coordinate": "405117", "Planning Authority": "Wigan Council", "Planning Application Reference": "A/23/95931/MAJOR", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.541062", "long": "-2.624739", "status": "planning", "mw": 50, "ext_id": "14892"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14892", "Record Last Updated (dd/mm/yyyy)": "27/09/2023", "Operator (or Applicant)": "Enzygo Limited Environmental Consultants", "Site Name": "Orrell Street Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7724", "Address": "Site Of Former Council Depot Orrell Street ", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "WN1 3AB", "X-coordinate": "358696", "Y-coordinate": "405117", "Planning Authority": "Wigan Council", "Planning Application Reference": "A/23/95931/MAJOR", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.541062", "long": "-2.624739", "status": "planning", "mw": 50, "ext_id": "14892"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Orrell Street Battery Energy Storage Facility", "name_short": "Orrell Street Battery Energy", "owner": "Enzygo Limited Environmental Consultants", "state": "north west", "country": "uk", "lat": "53.541062", "long": "-2.624739", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.541062+-2.624739", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "city": "", "id": "1255", "external_id": "14932", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "180", "power_mw": "180", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1255", "external_id": "14932", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "external_id": "14932", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 180, "power_mw": 180, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.566834", "long": "-1.109661", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14932", "Record Last Updated (dd/mm/yyyy)": "02/10/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "180", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Fordstead Lane Almholme Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN5 0LN", "X-coordinate": "459064", "Y-coordinate": "408171", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/01746/FULM\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.566834", "long": "-1.109661", "status": "planning", "mw": 180, "ext_id": "14932"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14932", "Record Last Updated (dd/mm/yyyy)": "02/10/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "180", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Fordstead Lane Almholme Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN5 0LN", "X-coordinate": "459064", "Y-coordinate": "408171", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/01746/FULM\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.566834", "long": "-1.109661", "status": "planning", "mw": 180, "ext_id": "14932"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 180, "mwh_is_estimate": true, "mwh": 180, "mwh_estimate": 180, "status": "planning", "status_class": "", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "name_short": "Fordtead Lane, Thorpe Marsh - Batte...", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.566834", "long": "-1.109661", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.566834+-1.109661", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Junction 27, Westleigh - Battery Storage", "city": "", "id": "1256", "external_id": "14935", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Clearstone Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1256", "external_id": "14935", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Junction 27, Westleigh - Battery Storage", "external_id": "14935", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Clearstone Energy", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.942355", "long": "-3.351226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14935", "Record Last Updated (dd/mm/yyyy)": "02/10/2023", "Operator (or Applicant)": "Clearstone Energy", "Site Name": "Junction 27, Westleigh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North of A361, Junction 27 Westleigh", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX16 7ES", "X-coordinate": "305163", "Y-coordinate": "116749", "Planning Authority": "Mid Devon District Council", "Planning Application Reference": "23/01351/MFUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.942355", "long": "-3.351226", "status": "planning", "mw": 400, "ext_id": "14935"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14935", "Record Last Updated (dd/mm/yyyy)": "02/10/2023", "Operator (or Applicant)": "Clearstone Energy", "Site Name": "Junction 27, Westleigh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North of A361, Junction 27 Westleigh", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX16 7ES", "X-coordinate": "305163", "Y-coordinate": "116749", "Planning Authority": "Mid Devon District Council", "Planning Application Reference": "23/01351/MFUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.942355", "long": "-3.351226", "status": "planning", "mw": 400, "ext_id": "14935"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Junction 27, Westleigh - Battery Storage", "name_short": "Junction 27, Westleigh", "owner": "Clearstone Energy", "state": "south west", "country": "uk", "lat": "50.942355", "long": "-3.351226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.942355+-3.351226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cargo Road, Cargo - Battery Storage", "city": "", "id": "1257", "external_id": "14939", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1257", "external_id": "14939", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cargo Road, Cargo - Battery Storage", "external_id": "14939", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Immersa Limited", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.922902", "long": "-2.979062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14939", "Record Last Updated (dd/mm/yyyy)": "03/10/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Cargo Road, Cargo - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south of Cargo Beck House, Cargo, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4BB", "X-coordinate": "337348", "Y-coordinate": "559129", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0613", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.922902", "long": "-2.979062", "status": "planning", "mw": 200, "ext_id": "14939"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14939", "Record Last Updated (dd/mm/yyyy)": "03/10/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Cargo Road, Cargo - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south of Cargo Beck House, Cargo, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4BB", "X-coordinate": "337348", "Y-coordinate": "559129", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0613", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.922902", "long": "-2.979062", "status": "planning", "mw": 200, "ext_id": "14939"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cargo Road, Cargo - Battery Storage", "name_short": "Cargo Road, Cargo", "owner": "Immersa Limited", "state": "north west", "country": "uk", "lat": "54.922902", "long": "-2.979062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.922902+-2.979062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Warren Lane, Bramham - Battery Energy Storage", "city": "", "id": "1258", "external_id": "14954", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1258", "external_id": "14954", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Warren Lane, Bramham - Battery Energy Storage", "external_id": "14954", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.873894", "long": "-1.322843", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14954", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Warren Lane, Bramham - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Warren Lane, Bramham, Tadcaster", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS24 9NU", "X-coordinate": "444620", "Y-coordinate": "442178", "Planning Authority": "Leeds City Council", "Planning Application Reference": "23/04572/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.873894", "long": "-1.322843", "status": "planning", "mw": 35, "ext_id": "14954"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14954", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Warren Lane, Bramham - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Warren Lane, Bramham, Tadcaster", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS24 9NU", "X-coordinate": "444620", "Y-coordinate": "442178", "Planning Authority": "Leeds City Council", "Planning Application Reference": "23/04572/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.873894", "long": "-1.322843", "status": "planning", "mw": 35, "ext_id": "14954"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Warren Lane, Bramham - Battery Energy Storage", "name_short": "Warren Lane, Bramham", "owner": "Harmony Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.873894", "long": "-1.322843", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.873894+-1.322843", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Hale Fen - Solar Farm", "city": "", "id": "1259", "external_id": "14955", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "AGR Solar 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1259", "external_id": "14955", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Little Hale Fen - Solar Farm", "external_id": "14955", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "AGR Solar 2 Limited", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.941644", "long": "-0.255062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14955", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "AGR Solar 2 Limited", "Site Name": "Little Hale Fen - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9586", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG34 9LT", "X-coordinate": "517357", "Y-coordinate": "339675", "Planning Authority": "North Kesteven District Council", "Planning Application Reference": "23/1021/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.941644", "long": "-0.255062", "status": "planning", "mw": 49, "ext_id": "14955"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14955", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "AGR Solar 2 Limited", "Site Name": "Little Hale Fen - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9586", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG34 9LT", "X-coordinate": "517357", "Y-coordinate": "339675", "Planning Authority": "North Kesteven District Council", "Planning Application Reference": "23/1021/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.941644", "long": "-0.255062", "status": "planning", "mw": 49, "ext_id": "14955"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Little Hale Fen - Solar Farm", "name_short": "Little Hale Fen - Solar Farm", "owner": "AGR Solar 2 Limited", "state": "east midlands", "country": "uk", "lat": "52.941644", "long": "-0.255062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.941644+-0.255062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Old Trent Road, Beckingham - Battery Storage Facility ", "city": "", "id": "1260", "external_id": "14956", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Recell Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1260", "external_id": "14956", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Old Trent Road, Beckingham - Battery Storage Facility ", "external_id": "14956", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Recell Energy", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.405933", "long": "-0.806456", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14956", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Recell Energy", "Site Name": "Old Trent Road, Beckingham - Battery Storage Facility ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off Old Trent Road, Beckingham, Doncaster", "County": "South Yorkshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN10 4NR", "X-coordinate": "479444", "Y-coordinate": "390565", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "23/01096/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.405933", "long": "-0.806456", "status": "planning", "mw": 80, "ext_id": "14956"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14956", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Recell Energy", "Site Name": "Old Trent Road, Beckingham - Battery Storage Facility ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off Old Trent Road, Beckingham, Doncaster", "County": "South Yorkshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN10 4NR", "X-coordinate": "479444", "Y-coordinate": "390565", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "23/01096/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.405933", "long": "-0.806456", "status": "planning", "mw": 80, "ext_id": "14956"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Old Trent Road, Beckingham - Battery Storage Facility ", "name_short": "Old Trent Road, Beckingham - Batter...", "owner": "Recell Energy", "state": "east midlands", "country": "uk", "lat": "53.405933", "long": "-0.806456", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.405933+-0.806456", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fox Cover Road - Battery Energy Storage", "city": "", "id": "1261", "external_id": "14968", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1261", "external_id": "14968", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fox Cover Road - Battery Energy Storage", "external_id": "14968", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.886083", "long": "-1.458327", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14968", "Record Last Updated (dd/mm/yyyy)": "05/10/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Fox Cover Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Foxcover Road Sunderland\n", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "SR4 9NL", "X-coordinate": "434847", "Y-coordinate": "554727", "Planning Authority": "Sunderland City Council", "Planning Application Reference": "23/01981/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.886083", "long": "-1.458327", "status": "planning", "mw": 30, "ext_id": "14968"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14968", "Record Last Updated (dd/mm/yyyy)": "05/10/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Fox Cover Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Foxcover Road Sunderland\n", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "SR4 9NL", "X-coordinate": "434847", "Y-coordinate": "554727", "Planning Authority": "Sunderland City Council", "Planning Application Reference": "23/01981/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.886083", "long": "-1.458327", "status": "planning", "mw": 30, "ext_id": "14968"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fox Cover Road - Battery Energy Storage", "name_short": "Fox Cover Road", "owner": "Newton Energi Limited", "state": "north east", "country": "uk", "lat": "54.886083", "long": "-1.458327", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.886083+-1.458327", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ditcher Law Wind Farm", "city": "", "id": "1262", "external_id": "14996", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "E Power Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1262", "external_id": "14996", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ditcher Law Wind Farm", "external_id": "14996", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "E Power Ltd", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.794816", "long": "-2.804023", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14996", "Record Last Updated (dd/mm/yyyy)": "09/10/2023", "Operator (or Applicant)": "E Power Ltd", "Site Name": "Ditcher Law Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8376", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/S/E & W/O Vineleaf Cottage", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD2 6RD", "X-coordinate": "349687", "Y-coordinate": "656017", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004890", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.794816", "long": "-2.804023", "status": "planning", "mw": 30, "ext_id": "14996"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14996", "Record Last Updated (dd/mm/yyyy)": "09/10/2023", "Operator (or Applicant)": "E Power Ltd", "Site Name": "Ditcher Law Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8376", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/S/E & W/O Vineleaf Cottage", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD2 6RD", "X-coordinate": "349687", "Y-coordinate": "656017", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004890", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.794816", "long": "-2.804023", "status": "planning", "mw": 30, "ext_id": "14996"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ditcher Law Wind Farm", "name_short": "Ditcher Law Wind Farm", "owner": "E Power Ltd", "state": "scotland", "country": "uk", "lat": "55.794816", "long": "-2.804023", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.794816+-2.804023", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackdyke Farm, Blackford - Battery Storage", "city": "", "id": "1263", "external_id": "15005", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1263", "external_id": "15005", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackdyke Farm, Blackford - Battery Storage", "external_id": "15005", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Innova Renewables", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.953508", "long": "-2.968236", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15005", "Record Last Updated (dd/mm/yyyy)": "25/10/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "Blackdyke Farm, Blackford - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of Blackdyke Farm, Blackford", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4EY", "X-coordinate": "338089", "Y-coordinate": "562525", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0444", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.953508", "long": "-2.968236", "status": "planning", "mw": 400, "ext_id": "15005"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15005", "Record Last Updated (dd/mm/yyyy)": "25/10/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "Blackdyke Farm, Blackford - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of Blackdyke Farm, Blackford", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4EY", "X-coordinate": "338089", "Y-coordinate": "562525", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0444", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.953508", "long": "-2.968236", "status": "planning", "mw": 400, "ext_id": "15005"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackdyke Farm, Blackford - Battery Storage", "name_short": "Blackdyke Farm, Blackford", "owner": "Innova Renewables", "state": "north west", "country": "uk", "lat": "54.953508", "long": "-2.968236", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.953508+-2.968236", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Severn Road, Hallen - Battery Storage Facility", "city": "", "id": "1264", "external_id": "15027", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "EL Avonmouth Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1264", "external_id": "15027", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Severn Road, Hallen - Battery Storage Facility", "external_id": "15027", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "EL Avonmouth Limited", "status": "planning", "date_first_heard": "2023-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.528262", "long": "-2.660641", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15027", "Record Last Updated (dd/mm/yyyy)": "11/10/2023", "Operator (or Applicant)": "EL Avonmouth Limited", "Site Name": "Severn Road, Hallen - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Severn Road, Hallen, Bristol", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS10 7RZ", "X-coordinate": "354267", "Y-coordinate": "181246", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P23/02741/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.528262", "long": "-2.660641", "status": "planning", "mw": 70, "ext_id": "15027"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15027", "Record Last Updated (dd/mm/yyyy)": "11/10/2023", "Operator (or Applicant)": "EL Avonmouth Limited", "Site Name": "Severn Road, Hallen - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Severn Road, Hallen, Bristol", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS10 7RZ", "X-coordinate": "354267", "Y-coordinate": "181246", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P23/02741/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.528262", "long": "-2.660641", "status": "planning", "mw": 70, "ext_id": "15027"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2023-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Severn Road, Hallen - Battery Storage Facility", "name_short": "Severn Road, Hallen", "owner": "EL Avonmouth Limited", "state": "south west", "country": "uk", "lat": "51.528262", "long": "-2.660641", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.528262+-2.660641", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stocking Lane - Battery Energy Facility", "city": "", "id": "1265", "external_id": "15082", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Nel Tiger", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1265", "external_id": "15082", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stocking Lane - Battery Energy Facility", "external_id": "15082", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Nel Tiger", "status": "planning", "date_first_heard": "2023-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.708951", "long": "-1.208247", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15082", "Record Last Updated (dd/mm/yyyy)": "23/10/2023", "Operator (or Applicant)": "Nel Tiger", "Site Name": "Stocking Lane - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stocking Lane, Weeland Road, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8DL", "X-coordinate": "452359", "Y-coordinate": "423905", "Planning Authority": "Selby District Council", "Planning Application Reference": "ZG2023/0938/FULM\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.708951", "long": "-1.208247", "status": "planning", "mw": 200, "ext_id": "15082"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15082", "Record Last Updated (dd/mm/yyyy)": "23/10/2023", "Operator (or Applicant)": "Nel Tiger", "Site Name": "Stocking Lane - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stocking Lane, Weeland Road, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8DL", "X-coordinate": "452359", "Y-coordinate": "423905", "Planning Authority": "Selby District Council", "Planning Application Reference": "ZG2023/0938/FULM\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.708951", "long": "-1.208247", "status": "planning", "mw": 200, "ext_id": "15082"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stocking Lane - Battery Energy Facility", "name_short": "Stocking Lane - Battery Energy Faci...", "owner": "Nel Tiger", "state": "yorkshire and humber", "country": "uk", "lat": "53.708951", "long": "-1.208247", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.708951+-1.208247", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Heron Solar Farm & Battery Storage", "city": "", "id": "1266", "external_id": "15084", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "JBM Solar Projects 38 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1266", "external_id": "15084", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Heron Solar Farm & Battery Storage", "external_id": "15084", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "JBM Solar Projects 38 Limited", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.924208", "long": "-1.02102", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "15084", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "JBM Solar Projects 38 Limited", "Site Name": "Heron Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15083", "Installed Capacity (MWelec)": "20", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "North Of Staragglethorpe Road Stragglethorpe, Colnbrook", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG12 2JX", "X-coordinate": "465913", "Y-coordinate": "336759", "Planning Authority": "Rushcliffe Council", "Planning Application Reference": "23/02250/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "06/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.924208", "long": "-1.02102", "status": "planning", "mw": 20, "ext_id": "15084"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "15084", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "JBM Solar Projects 38 Limited", "Site Name": "Heron Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15083", "Installed Capacity (MWelec)": "20", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "North Of Staragglethorpe Road Stragglethorpe, Colnbrook", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG12 2JX", "X-coordinate": "465913", "Y-coordinate": "336759", "Planning Authority": "Rushcliffe Council", "Planning Application Reference": "23/02250/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "06/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.924208", "long": "-1.02102", "status": "planning", "mw": 20, "ext_id": "15084"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Heron Solar Farm & Battery Storage", "name_short": "Heron Solar Farm &", "owner": "JBM Solar Projects 38 Limited", "state": "east midlands", "country": "uk", "lat": "52.924208", "long": "-1.02102", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.924208+-1.02102", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hare Craig Windfarm", "city": "", "id": "1267", "external_id": "15101", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "EnergieKontor UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1267", "external_id": "15101", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hare Craig Windfarm", "external_id": "15101", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "EnergieKontor UK", "status": "planning", "date_first_heard": "2022-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.555964", "long": "-3.99784", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15101", "Record Last Updated (dd/mm/yyyy)": "24/10/2023", "Operator (or Applicant)": "EnergieKontor UK", "Site Name": "Hare Craig Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7261", "Installed Capacity (MWelec)": "13.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Hare Craig, Muirkirk, Cumnock, Strathclyde", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "274078", "Y-coordinate": "630954", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "20/0001/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/07/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.555964", "long": "-3.99784", "status": "planning", "mw": 13, "ext_id": "15101"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15101", "Record Last Updated (dd/mm/yyyy)": "24/10/2023", "Operator (or Applicant)": "EnergieKontor UK", "Site Name": "Hare Craig Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7261", "Installed Capacity (MWelec)": "13.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Hare Craig, Muirkirk, Cumnock, Strathclyde", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "274078", "Y-coordinate": "630954", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "20/0001/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/07/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.555964", "long": "-3.99784", "status": "planning", "mw": 13, "ext_id": "15101"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "planning", "status_class": "", "date_first_heard": "2022-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hare Craig Windfarm", "name_short": "Hare Craig Windfarm", "owner": "EnergieKontor UK", "state": "scotland", "country": "uk", "lat": "55.555964", "long": "-3.99784", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.555964+-3.99784", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "city": "", "id": "1268", "external_id": "15127", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "W Rigby & Sons", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1268", "external_id": "15127", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "external_id": "15127", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "W Rigby & Sons", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.340564", "long": "-1.960056", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15127", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "W Rigby & Sons", "Site Name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chinley House Farm, Dolly Lane, Buxworth, High Peak", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK23 7NP", "X-coordinate": "402757", "Y-coordinate": "382630", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2023/0407", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.340564", "long": "-1.960056", "status": "planning", "mw": 13, "ext_id": "15127"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15127", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "W Rigby & Sons", "Site Name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chinley House Farm, Dolly Lane, Buxworth, High Peak", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK23 7NP", "X-coordinate": "402757", "Y-coordinate": "382630", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2023/0407", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.340564", "long": "-1.960056", "status": "planning", "mw": 13, "ext_id": "15127"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "planning", "status_class": "", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "name_short": "Dolly Lane, Buxworth - Battery Stor...", "owner": "W Rigby & Sons", "state": "east midlands", "country": "uk", "lat": "53.340564", "long": "-1.960056", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.340564+-1.960056", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tanners Lane - Battery Energy Storage System", "city": "", "id": "1269", "external_id": "15128", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Tag Energy Development UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1269", "external_id": "15128", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tanners Lane - Battery Energy Storage System", "external_id": "15128", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Tag Energy Development UK Limited", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.402358", "long": "-1.605087", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15128", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Tag Energy Development UK Limited", "Site Name": "Tanners Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off Tanners Lane, Coventry", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DD", "X-coordinate": "426965", "Y-coordinate": "278334", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2023/02051/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.402358", "long": "-1.605087", "status": "planning", "mw": 30, "ext_id": "15128"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15128", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Tag Energy Development UK Limited", "Site Name": "Tanners Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off Tanners Lane, Coventry", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DD", "X-coordinate": "426965", "Y-coordinate": "278334", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2023/02051/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.402358", "long": "-1.605087", "status": "planning", "mw": 30, "ext_id": "15128"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tanners Lane - Battery Energy Storage System", "name_short": "Tanners Lane - Battery", "owner": "Tag Energy Development UK Limited", "state": "west midlands", "country": "uk", "lat": "52.402358", "long": "-1.605087", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.402358+-1.605087", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aikengall, Innerwick - Battery Energy Storage", "city": "", "id": "1270", "external_id": "15141", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Redstone Rig Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1270", "external_id": "15141", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Aikengall, Innerwick - Battery Energy Storage", "external_id": "15141", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Redstone Rig Storage Limited", "status": "planning", "date_first_heard": "2023-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.948866", "long": "-2.466127", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "15141", "Record Last Updated (dd/mm/yyyy)": "31/10/2023", "Operator (or Applicant)": "Redstone Rig Storage Limited", "Site Name": "Aikengall, Innerwick - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4526", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Aikengall Innerwick Dunbar\ufffd", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH42 1SG", "X-coordinate": "370988", "Y-coordinate": "672968", "Planning Authority": "East Lothian Council", "Planning Application Reference": "23/01071/P", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "11/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.948866", "long": "-2.466127", "status": "planning", "mw": 19, "ext_id": "15141"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "15141", "Record Last Updated (dd/mm/yyyy)": "31/10/2023", "Operator (or Applicant)": "Redstone Rig Storage Limited", "Site Name": "Aikengall, Innerwick - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4526", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Aikengall Innerwick Dunbar\ufffd", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH42 1SG", "X-coordinate": "370988", "Y-coordinate": "672968", "Planning Authority": "East Lothian Council", "Planning Application Reference": "23/01071/P", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "11/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.948866", "long": "-2.466127", "status": "planning", "mw": 19, "ext_id": "15141"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2023-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Aikengall, Innerwick - Battery Energy Storage", "name_short": "Aikengall, Innerwick", "owner": "Redstone Rig Storage Limited", "state": "scotland", "country": "uk", "lat": "55.948866", "long": "-2.466127", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.948866+-2.466127", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Red Barn - Solar Farm & Battery Storage", "city": "", "id": "1271", "external_id": "15146", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1271", "external_id": "15146", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Red Barn - Solar Farm & Battery Storage", "external_id": "15146", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Eden Renewables", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.500536", "long": "-2.126064", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15146", "Record Last Updated (dd/mm/yyyy)": "01/11/2023", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Red Barn - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15145", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Red Barn, East of Kington St Michael", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14 6BQ", "X-coordinate": "391346", "Y-coordinate": "177963", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2023/08481", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.500536", "long": "-2.126064", "status": "planning", "mw": 40, "ext_id": "15146"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15146", "Record Last Updated (dd/mm/yyyy)": "01/11/2023", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Red Barn - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15145", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Red Barn, East of Kington St Michael", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14 6BQ", "X-coordinate": "391346", "Y-coordinate": "177963", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2023/08481", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.500536", "long": "-2.126064", "status": "planning", "mw": 40, "ext_id": "15146"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Red Barn - Solar Farm & Battery Storage", "name_short": "Red Barn - Solar Farm &", "owner": "Eden Renewables", "state": "south west", "country": "uk", "lat": "51.500536", "long": "-2.126064", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.500536+-2.126064", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coolkeeragh - Battery Storage", "city": "", "id": "1272", "external_id": "15151", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "140", "customer": "", "owner": "Coolkeeragh BES Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1272", "external_id": "15151", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coolkeeragh - Battery Storage", "external_id": "15151", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 140, "power_mw": 140, "owner": "Coolkeeragh BES Ltd", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.034233", "long": "-7.251546", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15151", "Record Last Updated (dd/mm/yyyy)": "01/11/2023", "Operator (or Applicant)": "Coolkeeragh BES Ltd", "Site Name": "Coolkeeragh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "140", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "23 Maydown Road , Londonderry", "County": "Co. Derry & Strabane", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT47 6UJ", "X-coordinate": "\t64602", "Y-coordinate": "\t583695", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA11/2023/1679/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.034233", "long": "-7.251546", "status": "planning", "mw": 140, "ext_id": "15151"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15151", "Record Last Updated (dd/mm/yyyy)": "01/11/2023", "Operator (or Applicant)": "Coolkeeragh BES Ltd", "Site Name": "Coolkeeragh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "140", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "23 Maydown Road , Londonderry", "County": "Co. Derry & Strabane", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT47 6UJ", "X-coordinate": "\t64602", "Y-coordinate": "\t583695", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA11/2023/1679/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.034233", "long": "-7.251546", "status": "planning", "mw": 140, "ext_id": "15151"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 140, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coolkeeragh - Battery Storage", "name_short": "Coolkeeragh", "owner": "Coolkeeragh BES Ltd", "state": "northern ireland", "country": "uk", "lat": "55.034233", "long": "-7.251546", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.034233+-7.251546", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Flatterton Farm, Flatterton Road - Battery Storage", "city": "", "id": "1273", "external_id": "15154", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Big Battery (Flatterton Farm) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1273", "external_id": "15154", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Flatterton Farm, Flatterton Road - Battery Storage", "external_id": "15154", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Big Battery (Flatterton Farm) Limited", "status": "planning", "date_first_heard": "2023-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.9331", "long": "-4.846146", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15154", "Record Last Updated (dd/mm/yyyy)": "02/11/2023", "Operator (or Applicant)": "Big Battery (Flatterton Farm) Limited", "Site Name": "Flatterton Farm, Flatterton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Flatterton Farm, Flatterton Road, Greenock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA16 0AD", "X-coordinate": "222306", "Y-coordinate": "674775", "Planning Authority": "Inverclyde Council", "Planning Application Reference": "23/0205/IC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.9331", "long": "-4.846146", "status": "planning", "mw": 49, "ext_id": "15154"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15154", "Record Last Updated (dd/mm/yyyy)": "02/11/2023", "Operator (or Applicant)": "Big Battery (Flatterton Farm) Limited", "Site Name": "Flatterton Farm, Flatterton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Flatterton Farm, Flatterton Road, Greenock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA16 0AD", "X-coordinate": "222306", "Y-coordinate": "674775", "Planning Authority": "Inverclyde Council", "Planning Application Reference": "23/0205/IC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.9331", "long": "-4.846146", "status": "planning", "mw": 49, "ext_id": "15154"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Flatterton Farm, Flatterton Road - Battery Storage", "name_short": "Flatterton Farm, Flatterton Road", "owner": "Big Battery (Flatterton Farm) Limited", "state": "scotland", "country": "uk", "lat": "55.9331", "long": "-4.846146", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.9331+-4.846146", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Monk Fryston Battery Storage", "city": "", "id": "1274", "external_id": "15164", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "320", "power_mw": "320", "customer": "", "owner": "SSE Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1274", "external_id": "15164", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Monk Fryston Battery Storage", "external_id": "15164", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 320, "power_mw": 320, "owner": "SSE Renewables", "status": "planning", "date_first_heard": "2022-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.754381", "long": "-1.265071", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15164", "Record Last Updated (dd/mm/yyyy)": "02/11/2023", "Operator (or Applicant)": "SSE Renewables", "Site Name": "Monk Fryston Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "320", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South Of Electricity Substation Rawfield Lane, Fairburn, Selby, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS25 5LD", "X-coordinate": "448556", "Y-coordinate": "428919", "Planning Authority": "North Yorkshire Council", "Planning Application Reference": "2021/0633/FULM", "Appeal Reference": "APP/N2739/W/22/3290256", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/12/2021", "Appeal Lodged": "07/01/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "01/08/2022", "Planning Permission Granted": "01/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.754381", "long": "-1.265071", "status": "planning", "mw": 320, "ext_id": "15164"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15164", "Record Last Updated (dd/mm/yyyy)": "02/11/2023", "Operator (or Applicant)": "SSE Renewables", "Site Name": "Monk Fryston Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "320", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South Of Electricity Substation Rawfield Lane, Fairburn, Selby, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS25 5LD", "X-coordinate": "448556", "Y-coordinate": "428919", "Planning Authority": "North Yorkshire Council", "Planning Application Reference": "2021/0633/FULM", "Appeal Reference": "APP/N2739/W/22/3290256", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/12/2021", "Appeal Lodged": "07/01/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "01/08/2022", "Planning Permission Granted": "01/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.754381", "long": "-1.265071", "status": "planning", "mw": 320, "ext_id": "15164"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 320, "mwh_is_estimate": true, "mwh": 320, "mwh_estimate": 320, "status": "planning", "status_class": "", "date_first_heard": "2022-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Monk Fryston Battery Storage", "name_short": "Monk Fryston", "owner": "SSE Renewables", "state": "yorkshire and humber", "country": "uk", "lat": "53.754381", "long": "-1.265071", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.754381+-1.265071", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wareham Road, Scouse Farm - Battery Storage", "city": "", "id": "1275", "external_id": "15165", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Ylem Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1275", "external_id": "15165", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wareham Road, Scouse Farm - Battery Storage", "external_id": "15165", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Ylem Energy Limited", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.786682", "long": "-2.931865", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15165", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Ylem Energy Limited", "Site Name": "Wareham Road, Scouse Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Of Wareham Road Scouse Farm Blackpool Corner ", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX13 5UE", "X-coordinate": "334407", "Y-coordinate": "98982", "Planning Authority": "East Devon District Council", "Planning Application Reference": "23/2099/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.786682", "long": "-2.931865", "status": "planning", "mw": 50, "ext_id": "15165"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15165", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Ylem Energy Limited", "Site Name": "Wareham Road, Scouse Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Of Wareham Road Scouse Farm Blackpool Corner ", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX13 5UE", "X-coordinate": "334407", "Y-coordinate": "98982", "Planning Authority": "East Devon District Council", "Planning Application Reference": "23/2099/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.786682", "long": "-2.931865", "status": "planning", "mw": 50, "ext_id": "15165"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wareham Road, Scouse Farm - Battery Storage", "name_short": "Wareham Road, Scouse Farm", "owner": "Ylem Energy Limited", "state": "south west", "country": "uk", "lat": "50.786682", "long": "-2.931865", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.786682+-2.931865", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cloud Hill Wind Farm", "city": "", "id": "1276", "external_id": "15174", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "34", "customer": "", "owner": "Blue Energy Company / BayWa r.e. UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1276", "external_id": "15174", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cloud Hill Wind Farm", "external_id": "15174", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 34, "power_mw": 34, "owner": "Blue Energy Company / BayWa r.e. UK Limited", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.325588", "long": "-3.986325", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15174", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Blue Energy Company / BayWa r.e. UK Limited", "Site Name": "Cloud Hill Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11112", "Installed Capacity (MWelec)": "34", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackaddie Road, Sanquhar", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG4 6DF", "X-coordinate": "274072", "Y-coordinate": "605300", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003461", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.325588", "long": "-3.986325", "status": "planning", "mw": 34, "ext_id": "15174"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15174", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Blue Energy Company / BayWa r.e. UK Limited", "Site Name": "Cloud Hill Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11112", "Installed Capacity (MWelec)": "34", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackaddie Road, Sanquhar", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG4 6DF", "X-coordinate": "274072", "Y-coordinate": "605300", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003461", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.325588", "long": "-3.986325", "status": "planning", "mw": 34, "ext_id": "15174"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 34, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "planning", "status_class": "", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cloud Hill Wind Farm", "name_short": "Cloud Hill Wind Farm", "owner": "Blue Energy Company / BayWa r.e. UK Limited", "state": "scotland", "country": "uk", "lat": "55.325588", "long": "-3.986325", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.325588+-3.986325", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vale of Leven Wind Farm", "city": "", "id": "1277", "external_id": "15175", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Coriolis Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1277", "external_id": "15175", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Vale of Leven Wind Farm", "external_id": "15175", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Coriolis Energy Limited", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.92438", "long": "-4.452767", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15175", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Coriolis Energy Limited", "Site Name": "Vale of Leven Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11110", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kilpatrick Hills, Bonhill, Alexandria", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G60 5LX", "X-coordinate": "246839", "Y-coordinate": "672863", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003468", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.92438", "long": "-4.452767", "status": "planning", "mw": 20, "ext_id": "15175"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15175", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Coriolis Energy Limited", "Site Name": "Vale of Leven Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11110", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kilpatrick Hills, Bonhill, Alexandria", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G60 5LX", "X-coordinate": "246839", "Y-coordinate": "672863", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003468", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.92438", "long": "-4.452767", "status": "planning", "mw": 20, "ext_id": "15175"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Vale of Leven Wind Farm", "name_short": "Vale of Leven Wind Farm", "owner": "Coriolis Energy Limited", "state": "scotland", "country": "uk", "lat": "55.92438", "long": "-4.452767", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.92438+-4.452767", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kilmarnock Battery Energy Storage System", "city": "", "id": "1278", "external_id": "15176", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Intergen Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1278", "external_id": "15176", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kilmarnock Battery Energy Storage System", "external_id": "15176", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Intergen Limited", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.572127", "long": "-4.438018", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15176", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Intergen Limited", "Site Name": "Kilmarnock Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "250 metres (m) to the north of the existing Kilmarnock South Substation", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JW", "X-coordinate": "246381", "Y-coordinate": "633639", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004941", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.572127", "long": "-4.438018", "status": "planning", "mw": 500, "ext_id": "15176"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15176", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Intergen Limited", "Site Name": "Kilmarnock Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "250 metres (m) to the north of the existing Kilmarnock South Substation", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JW", "X-coordinate": "246381", "Y-coordinate": "633639", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004941", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.572127", "long": "-4.438018", "status": "planning", "mw": 500, "ext_id": "15176"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kilmarnock Battery Energy Storage System", "name_short": "Kilmarnock Battery", "owner": "Intergen Limited", "state": "scotland", "country": "uk", "lat": "55.572127", "long": "-4.438018", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.572127+-4.438018", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "1279", "external_id": "15230", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coventry Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1279", "external_id": "15230", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "external_id": "15230", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Coventry Energy Storage Limited", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.386266", "long": "-1.610608", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15230", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Coventry Energy Storage Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12936", "Address": "E/O Hodgetts Lane, Berkswell, Solihull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426599", "Y-coordinate": "276542", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2023/02196/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386266", "long": "-1.610608", "status": "planning", "mw": 49, "ext_id": "15230"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15230", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Coventry Energy Storage Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12936", "Address": "E/O Hodgetts Lane, Berkswell, Solihull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426599", "Y-coordinate": "276542", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2023/02196/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386266", "long": "-1.610608", "status": "planning", "mw": 49, "ext_id": "15230"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "name_short": "Hodgetts Lane, Berkswell - Electric...", "owner": "Coventry Energy Storage Limited", "state": "west midlands", "country": "uk", "lat": "52.386266", "long": "-1.610608", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.386266+-1.610608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rock Farm - Solar Farm", "city": "", "id": "1280", "external_id": "15248", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1280", "external_id": "15248", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rock Farm - Solar Farm", "external_id": "15248", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Anglo Renewables", "status": "planning", "date_first_heard": "2023-09-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.377696", "long": "-2.699588", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15248", "Record Last Updated (dd/mm/yyyy)": "15/11/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Rock Farm - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15248", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SE Of Rock Farm Rocks Green Ludlow ", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "SY8 2DS", "X-coordinate": "352474", "Y-coordinate": "275748", "Planning Authority": "Shropshire Council", "Planning Application Reference": "22/05424/EIA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.377696", "long": "-2.699588", "status": "planning", "mw": 12, "ext_id": "15248"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15248", "Record Last Updated (dd/mm/yyyy)": "15/11/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Rock Farm - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15248", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SE Of Rock Farm Rocks Green Ludlow ", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "SY8 2DS", "X-coordinate": "352474", "Y-coordinate": "275748", "Planning Authority": "Shropshire Council", "Planning Application Reference": "22/05424/EIA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.377696", "long": "-2.699588", "status": "planning", "mw": 12, "ext_id": "15248"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2023-09-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rock Farm - Solar Farm", "name_short": "Rock Farm - Solar Farm", "owner": "Anglo Renewables", "state": "west midlands", "country": "uk", "lat": "52.377696", "long": "-2.699588", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.377696+-2.699588", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "city": "", "id": "1281", "external_id": "15263", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Enso Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1281", "external_id": "15263", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "external_id": "15263", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 350, "power_mw": 350, "owner": "Enso Energy Limited", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.5452", "long": "-2.960247", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15263", "Record Last Updated (dd/mm/yyyy)": "16/01/2024", "Operator (or Applicant)": "Enso Energy Limited", "Site Name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "350", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Uskmouth Power Station, West Nash Road, Nash, Newport", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP18 2BZ", "X-coordinate": "333508", "Y-coordinate": "183360", "Planning Authority": "Newport City Council", "Planning Application Reference": "23/0949", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/01/2024", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/01/2029", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.5452", "long": "-2.960247", "status": "planning", "mw": 350, "ext_id": "15263"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15263", "Record Last Updated (dd/mm/yyyy)": "16/01/2024", "Operator (or Applicant)": "Enso Energy Limited", "Site Name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "350", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Uskmouth Power Station, West Nash Road, Nash, Newport", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP18 2BZ", "X-coordinate": "333508", "Y-coordinate": "183360", "Planning Authority": "Newport City Council", "Planning Application Reference": "23/0949", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/01/2024", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/01/2029", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.5452", "long": "-2.960247", "status": "planning", "mw": 350, "ext_id": "15263"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 350, "mwh_is_estimate": true, "mwh": 350, "mwh_estimate": 350, "status": "planning", "status_class": "", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "name_short": "Uskmouth Power Station, West Nash R...", "owner": "Enso Energy Limited", "state": "wales", "country": "uk", "lat": "51.5452", "long": "-2.960247", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.5452+-2.960247", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "New Road, Featherstone - Battery Storage", "city": "", "id": "1282", "external_id": "15297", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Chiltern Renewables Hockliffe Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1282", "external_id": "15297", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "New Road, Featherstone - Battery Storage", "external_id": "15297", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Chiltern Renewables Hockliffe Limited", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.647388", "long": "-2.093176", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15297", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Chiltern Renewables Hockliffe Limited", "Site Name": "New Road, Featherstone - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O New Road, Featherstone, Wolverhampton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV10 7TU", "X-coordinate": "393793", "Y-coordinate": "305521", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/01031/OUTM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.647388", "long": "-2.093176", "status": "planning", "mw": 100, "ext_id": "15297"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15297", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Chiltern Renewables Hockliffe Limited", "Site Name": "New Road, Featherstone - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O New Road, Featherstone, Wolverhampton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV10 7TU", "X-coordinate": "393793", "Y-coordinate": "305521", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/01031/OUTM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.647388", "long": "-2.093176", "status": "planning", "mw": 100, "ext_id": "15297"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "New Road, Featherstone - Battery Storage", "name_short": "New Road, Featherstone", "owner": "Chiltern Renewables Hockliffe Limited", "state": "west midlands", "country": "uk", "lat": "52.647388", "long": "-2.093176", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.647388+-2.093176", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Battery Energy Storage Facility in Londonderry", "city": "", "id": "1283", "external_id": "15303", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "34", "customer": "", "owner": "Heron Storage Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1283", "external_id": "15303", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Battery Energy Storage Facility in Londonderry", "external_id": "15303", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 34, "power_mw": 34, "owner": "Heron Storage Ltd", "status": "planning", "date_first_heard": "2023-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.034435", "long": "-7.208204", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15303", "Record Last Updated (dd/mm/yyyy)": "22/11/2023", "Operator (or Applicant)": "Heron Storage Ltd", "Site Name": "Battery Energy Storage Facility in Londonderry", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "34", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lands At Campsie Industrial Estate , C. 65m S.E. Of E+I Engineering Campsie Unit, Campsie, Londonderry", "County": "Co. Derry & Strabane", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT47 3XY", "X-coordinate": "67370", "Y-coordinate": "583510", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA11/2023/2109/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.034435", "long": "-7.208204", "status": "planning", "mw": 34, "ext_id": "15303"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15303", "Record Last Updated (dd/mm/yyyy)": "22/11/2023", "Operator (or Applicant)": "Heron Storage Ltd", "Site Name": "Battery Energy Storage Facility in Londonderry", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "34", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lands At Campsie Industrial Estate , C. 65m S.E. Of E+I Engineering Campsie Unit, Campsie, Londonderry", "County": "Co. Derry & Strabane", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT47 3XY", "X-coordinate": "67370", "Y-coordinate": "583510", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA11/2023/2109/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.034435", "long": "-7.208204", "status": "planning", "mw": 34, "ext_id": "15303"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 34, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "planning", "status_class": "", "date_first_heard": "2023-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Battery Energy Storage Facility in Londonderry", "name_short": "Battery Energy Storage Facility in ...", "owner": "Heron Storage Ltd", "state": "northern ireland", "country": "uk", "lat": "55.034435", "long": "-7.208204", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.034435+-7.208204", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lowfields Energy Storage Project", "city": "", "id": "1284", "external_id": "15304", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1284", "external_id": "15304", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lowfields Energy Storage Project", "external_id": "15304", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "planning", "date_first_heard": "2023-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15304", "Record Last Updated (dd/mm/yyyy)": "23/11/2023", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Lowfields Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10236", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "22/01356/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "15304"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15304", "Record Last Updated (dd/mm/yyyy)": "23/11/2023", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Lowfields Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10236", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "22/01356/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "15304"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lowfields Energy Storage Project", "name_short": "Lowfields", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.692652+-1.82446", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chapel Lane - Battery Energy Storage System", "city": "", "id": "1285", "external_id": "15308", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1285", "external_id": "15308", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chapel Lane - Battery Energy Storage System", "external_id": "15308", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco Limited", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.562502", "long": "-1.925062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15308", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Chapel Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9721", "Address": "Adj The Duckery, Chapel Lane, Great Barr, Walsall", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS9 0QU", "X-coordinate": "405177", "Y-coordinate": "296077", "Planning Authority": "Walsall Metropolitan Borough Council", "Planning Application Reference": "23/1286", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.562502", "long": "-1.925062", "status": "planning", "mw": 49, "ext_id": "15308"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15308", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Chapel Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9721", "Address": "Adj The Duckery, Chapel Lane, Great Barr, Walsall", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS9 0QU", "X-coordinate": "405177", "Y-coordinate": "296077", "Planning Authority": "Walsall Metropolitan Borough Council", "Planning Application Reference": "23/1286", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.562502", "long": "-1.925062", "status": "planning", "mw": 49, "ext_id": "15308"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chapel Lane - Battery Energy Storage System", "name_short": "Chapel Lane - Battery", "owner": "Anesco Limited", "state": "west midlands", "country": "uk", "lat": "52.562502", "long": "-1.925062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.562502+-1.925062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coylton Greener Grid Park", "city": "", "id": "1286", "external_id": "15312", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1286", "external_id": "15312", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "external_id": "15312", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Statkraft UK Limited", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.454634", "long": "-4.266842", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15312", "Record Last Updated (dd/mm/yyyy)": "28/11/2023", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10162", "Address": "Electricity Substation A70 From B730 To U74 Bardarroch Ochiltree ", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256745", "Y-coordinate": "620201", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0580/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454634", "long": "-4.266842", "status": "planning", "mw": 50, "ext_id": "15312"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15312", "Record Last Updated (dd/mm/yyyy)": "28/11/2023", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10162", "Address": "Electricity Substation A70 From B730 To U74 Bardarroch Ochiltree ", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256745", "Y-coordinate": "620201", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0580/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454634", "long": "-4.266842", "status": "planning", "mw": 50, "ext_id": "15312"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "name_short": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "owner": "Statkraft UK Limited", "state": "scotland", "country": "uk", "lat": "55.454634", "long": "-4.266842", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.454634+-4.266842", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Westfield Road, Carlton - Battery Storage", "city": "", "id": "1287", "external_id": "15338", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Firma Vogt Solar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1287", "external_id": "15338", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Westfield Road, Carlton - Battery Storage", "external_id": "15338", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Firma Vogt Solar Limited", "status": "planning", "date_first_heard": "2023-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.740061", "long": "-1.494102", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15338", "Record Last Updated (dd/mm/yyyy)": "01/12/2023", "Operator (or Applicant)": "Firma Vogt Solar Limited", "Site Name": "Westfield Road, Carlton - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "13264", "Address": "Westfield Road Carlton ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF3 3TW", "X-coordinate": "433466", "Y-coordinate": "427194", "Planning Authority": "Leeds Council", "Planning Application Reference": "23/06404/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.740061", "long": "-1.494102", "status": "planning", "mw": 50, "ext_id": "15338"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15338", "Record Last Updated (dd/mm/yyyy)": "01/12/2023", "Operator (or Applicant)": "Firma Vogt Solar Limited", "Site Name": "Westfield Road, Carlton - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "13264", "Address": "Westfield Road Carlton ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF3 3TW", "X-coordinate": "433466", "Y-coordinate": "427194", "Planning Authority": "Leeds Council", "Planning Application Reference": "23/06404/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.740061", "long": "-1.494102", "status": "planning", "mw": 50, "ext_id": "15338"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Westfield Road, Carlton - Battery Storage", "name_short": "Westfield Road, Carlton", "owner": "Firma Vogt Solar Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.740061", "long": "-1.494102", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.740061+-1.494102", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Midland Road - Battery Energy Storage", "city": "", "id": "1288", "external_id": "15343", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Unknown", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1288", "external_id": "15343", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Midland Road - Battery Energy Storage", "external_id": "15343", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Unknown", "status": "planning", "date_first_heard": "2023-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.80334", "long": "-1.757175", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15343", "Record Last Updated (dd/mm/yyyy)": "04/12/2023", "Operator (or Applicant)": "Unknown", "Site Name": "Midland Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Midland Road, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD8 7DY", "X-coordinate": "416090", "Y-coordinate": "434143", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "ECU00002171", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.80334", "long": "-1.757175", "status": "planning", "mw": 80, "ext_id": "15343"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15343", "Record Last Updated (dd/mm/yyyy)": "04/12/2023", "Operator (or Applicant)": "Unknown", "Site Name": "Midland Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Midland Road, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD8 7DY", "X-coordinate": "416090", "Y-coordinate": "434143", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "ECU00002171", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.80334", "long": "-1.757175", "status": "planning", "mw": 80, "ext_id": "15343"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Midland Road - Battery Energy Storage", "name_short": "Midland Road", "owner": "Unknown", "state": "yorkshire and humber", "country": "uk", "lat": "53.80334", "long": "-1.757175", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.80334+-1.757175", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "city": "", "id": "1289", "external_id": "15375", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1289", "external_id": "15375", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "external_id": "15375", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.710944", "long": "-1.174453", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15375", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lunn Lane Kellington", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0XT", "X-coordinate": "454587", "Y-coordinate": "424152", "Planning Authority": "North Yorkshire Council", "Planning Application Reference": "ZG2023/1179/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.710944", "long": "-1.174453", "status": "planning", "mw": 200, "ext_id": "15375"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15375", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lunn Lane Kellington", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0XT", "X-coordinate": "454587", "Y-coordinate": "424152", "Planning Authority": "North Yorkshire Council", "Planning Application Reference": "ZG2023/1179/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.710944", "long": "-1.174453", "status": "planning", "mw": 200, "ext_id": "15375"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "name_short": "Corner Of Weeland Road, Lunn Lane", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.710944", "long": "-1.174453", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.710944+-1.174453", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newlands Hill Wind Energy Hub", "city": "", "id": "1290", "external_id": "15383", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "136", "power_mw": "136", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1290", "external_id": "15383", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newlands Hill Wind Energy Hub", "external_id": "15383", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 136, "power_mw": 136, "owner": "Belltown Power Limited", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.873951", "long": "-2.639845", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15383", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Newlands Hill Wind Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12289", "Installed Capacity (MWelec)": "136", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lammermuir Hills, Gifford", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD11 3SP", "X-coordinate": "360062", "Y-coordinate": "664717", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004603", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.873951", "long": "-2.639845", "status": "planning", "mw": 136, "ext_id": "15383"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15383", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Newlands Hill Wind Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12289", "Installed Capacity (MWelec)": "136", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lammermuir Hills, Gifford", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD11 3SP", "X-coordinate": "360062", "Y-coordinate": "664717", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004603", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.873951", "long": "-2.639845", "status": "planning", "mw": 136, "ext_id": "15383"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 136, "mwh_is_estimate": true, "mwh": 136, "mwh_estimate": 136, "status": "planning", "status_class": "", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newlands Hill Wind Energy Hub", "name_short": "Newlands Hill Wind Energy Hub", "owner": "Belltown Power Limited", "state": "scotland", "country": "uk", "lat": "55.873951", "long": "-2.639845", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.873951+-2.639845", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ash Tree Solar Farm & Battery Storage", "city": "", "id": "1291", "external_id": "15397", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Low Carbon Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1291", "external_id": "15397", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ash Tree Solar Farm & Battery Storage", "external_id": "15397", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Low Carbon Limited", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.911764", "long": "-0.582264", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15397", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Low Carbon Limited", "Site Name": "Ash Tree Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15396", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "High Dike Road Londonthorpe", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG31 9ER", "X-coordinate": "495436", "Y-coordinate": "335867", "Planning Authority": "South Kesteven Council", "Planning Application Reference": "S23/2199", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.911764", "long": "-0.582264", "status": "planning", "mw": 25, "ext_id": "15397"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15397", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Low Carbon Limited", "Site Name": "Ash Tree Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15396", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "High Dike Road Londonthorpe", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG31 9ER", "X-coordinate": "495436", "Y-coordinate": "335867", "Planning Authority": "South Kesteven Council", "Planning Application Reference": "S23/2199", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.911764", "long": "-0.582264", "status": "planning", "mw": 25, "ext_id": "15397"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ash Tree Solar Farm & Battery Storage", "name_short": "Ash Tree Solar Farm &", "owner": "Low Carbon Limited", "state": "east midlands", "country": "uk", "lat": "52.911764", "long": "-0.582264", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.911764+-0.582264", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "city": "", "id": "1292", "external_id": "15401", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1292", "external_id": "15401", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "external_id": "15401", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 22, "power_mw": 22, "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "status": "planning", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.051256", "long": "0.463812", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15401", "Record Last Updated (dd/mm/yyyy)": "11/12/2023", "Operator (or Applicant)": "Boultbee Brooks (Renewables Rowley Hill) Limited", "Site Name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15400", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " South Of Sturmer Hall Church Walk Sturmer ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "CB9 7BS", "X-coordinate": "569038", "Y-coordinate": "242072", "Planning Authority": "Braintree Council", "Planning Application Reference": "23/02705/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.051256", "long": "0.463812", "status": "planning", "mw": 22, "ext_id": "15401"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15401", "Record Last Updated (dd/mm/yyyy)": "11/12/2023", "Operator (or Applicant)": "Boultbee Brooks (Renewables Rowley Hill) Limited", "Site Name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15400", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " South Of Sturmer Hall Church Walk Sturmer ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "CB9 7BS", "X-coordinate": "569038", "Y-coordinate": "242072", "Planning Authority": "Braintree Council", "Planning Application Reference": "23/02705/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.051256", "long": "0.463812", "status": "planning", "mw": 22, "ext_id": "15401"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 22, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "planning", "status_class": "", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "name_short": "Surmer Hall, Church Walk - Solar Fa...", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "state": "eastern", "country": "uk", "lat": "52.051256", "long": "0.463812", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.051256+0.463812", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "city": "", "id": "1293", "external_id": "15417", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1293", "external_id": "15417", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "external_id": "15417", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 22, "power_mw": 22, "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.051256", "long": "0.463812", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15417", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "Boultbee Brooks (Renewables Rowley Hill) Limited", "Site Name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15416", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " South Of Sturmer Hall Church Walk Sturmer ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "CB9 7BS", "X-coordinate": "569038", "Y-coordinate": "242072", "Planning Authority": "Braintree District Council", "Planning Application Reference": "23/02705/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.051256", "long": "0.463812", "status": "planning", "mw": 22, "ext_id": "15417"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15417", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "Boultbee Brooks (Renewables Rowley Hill) Limited", "Site Name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15416", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " South Of Sturmer Hall Church Walk Sturmer ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "CB9 7BS", "X-coordinate": "569038", "Y-coordinate": "242072", "Planning Authority": "Braintree District Council", "Planning Application Reference": "23/02705/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.051256", "long": "0.463812", "status": "planning", "mw": 22, "ext_id": "15417"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 22, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "planning", "status_class": "", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "name_short": "Surmer Hall, Church Walk - Solar Fa...", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "state": "eastern", "country": "uk", "lat": "52.051256", "long": "0.463812", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.051256+0.463812", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Auchentiber Road - Battery Energy Storage System", "city": "", "id": "1294", "external_id": "15425", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "700", "customer": "", "owner": "Apatura GPC 700 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1294", "external_id": "15425", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Auchentiber Road - Battery Energy Storage System", "external_id": "15425", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 700, "power_mw": 700, "owner": "Apatura GPC 700 Limited", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.906211", "long": "-4.694127", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15425", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "Apatura GPC 700 Limited", "Site Name": "Auchentiber Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "700", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Auchentiber Road, Port Glasgow, Kilmalcolm", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA13 4SP", "X-coordinate": "231683", "Y-coordinate": "671403", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004979", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.906211", "long": "-4.694127", "status": "planning", "mw": 700, "ext_id": "15425"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15425", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "Apatura GPC 700 Limited", "Site Name": "Auchentiber Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "700", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Auchentiber Road, Port Glasgow, Kilmalcolm", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA13 4SP", "X-coordinate": "231683", "Y-coordinate": "671403", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004979", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.906211", "long": "-4.694127", "status": "planning", "mw": 700, "ext_id": "15425"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 700, "mwh_is_estimate": true, "mwh": 700, "mwh_estimate": 700, "status": "planning", "status_class": "", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Auchentiber Road - Battery Energy Storage System", "name_short": "Auchentiber Road - Battery", "owner": "Apatura GPC 700 Limited", "state": "scotland", "country": "uk", "lat": "55.906211", "long": "-4.694127", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.906211+-4.694127", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Burcot Solar Farm", "city": "", "id": "1295", "external_id": "15444", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Ethical Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1295", "external_id": "15444", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Burcot Solar Farm", "external_id": "15444", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Ethical Power", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.666301", "long": "-1.191234", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15444", "Record Last Updated (dd/mm/yyyy)": "18/12/2023", "Operator (or Applicant)": "Ethical Power", "Site Name": "Burcot Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15443", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9374 & 14303", "Address": "Burcot Farm Burcot", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX14 3GW", "X-coordinate": "456032", "Y-coordinate": "196701", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P23/S4132/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.666301", "long": "-1.191234", "status": "planning", "mw": 49, "ext_id": "15444"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15444", "Record Last Updated (dd/mm/yyyy)": "18/12/2023", "Operator (or Applicant)": "Ethical Power", "Site Name": "Burcot Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15443", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9374 & 14303", "Address": "Burcot Farm Burcot", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX14 3GW", "X-coordinate": "456032", "Y-coordinate": "196701", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P23/S4132/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.666301", "long": "-1.191234", "status": "planning", "mw": 49, "ext_id": "15444"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Burcot Solar Farm", "name_short": "Burcot Solar Farm", "owner": "Ethical Power", "state": "south east", "country": "uk", "lat": "51.666301", "long": "-1.191234", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.666301+-1.191234", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "city": "", "id": "1296", "external_id": "15446", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Net Zero Twelve Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1296", "external_id": "15446", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "external_id": "15446", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Net Zero Twelve Limited", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.66622", "long": "-2.094458", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15446", "Record Last Updated (dd/mm/yyyy)": "18/12/2023", "Operator (or Applicant)": "Net Zero Twelve Limited", "Site Name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Upper Latherford Farm Latherford Lane Latherford", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV10 7DX", "X-coordinate": "393709", "Y-coordinate": "307616", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00883/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.66622", "long": "-2.094458", "status": "planning", "mw": 50, "ext_id": "15446"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15446", "Record Last Updated (dd/mm/yyyy)": "18/12/2023", "Operator (or Applicant)": "Net Zero Twelve Limited", "Site Name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Upper Latherford Farm Latherford Lane Latherford", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV10 7DX", "X-coordinate": "393709", "Y-coordinate": "307616", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00883/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.66622", "long": "-2.094458", "status": "planning", "mw": 50, "ext_id": "15446"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "name_short": "Upper Latherford Farm, Latherford L...", "owner": "Net Zero Twelve Limited", "state": "west midlands", "country": "uk", "lat": "52.66622", "long": "-2.094458", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.66622+-2.094458", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holt Road - Battery Energy Storage", "city": "", "id": "1297", "external_id": "15470", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1297", "external_id": "15470", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holt Road - Battery Energy Storage", "external_id": "15470", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 47, "power_mw": 47, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.850874", "long": "-1.890156", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15470", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Holt Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holt Road, Wimborne", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH21 6SE", "X-coordinate": "407829", "Y-coordinate": "105712", "Planning Authority": "Dorset Council", "Planning Application Reference": "P/FUL/2023/06578", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.850874", "long": "-1.890156", "status": "planning", "mw": 47, "ext_id": "15470"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15470", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Holt Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holt Road, Wimborne", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH21 6SE", "X-coordinate": "407829", "Y-coordinate": "105712", "Planning Authority": "Dorset Council", "Planning Application Reference": "P/FUL/2023/06578", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.850874", "long": "-1.890156", "status": "planning", "mw": 47, "ext_id": "15470"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 47, "mwh_is_estimate": true, "mwh": 47, "mwh_estimate": 47, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holt Road - Battery Energy Storage", "name_short": "Holt Road", "owner": "EDF Energy Renewables", "state": "south west", "country": "uk", "lat": "50.850874", "long": "-1.890156", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.850874+-1.890156", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penrhos Works - Battery Energy Storage System", "city": "", "id": "1298", "external_id": "15472", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "Anglesey Land Holdings Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1298", "external_id": "15472", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penrhos Works - Battery Energy Storage System", "external_id": "15472", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 349, "power_mw": 349, "owner": "Anglesey Land Holdings Limited", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.29477", "long": "-4.596967", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15472", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "Anglesey Land Holdings Limited", "Site Name": "Penrhos Works - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Penrhos Works, Holyhead", "County": "Gwynedd", "Region": "Wales", "Country": "Wales", "Post Code": "LL65 2UX", "X-coordinate": "227015", "Y-coordinate": "380681", "Planning Authority": "Isle of Anglesey County Council", "Planning Application Reference": "OP/2023/8", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.29477", "long": "-4.596967", "status": "planning", "mw": 349, "ext_id": "15472"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15472", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "Anglesey Land Holdings Limited", "Site Name": "Penrhos Works - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Penrhos Works, Holyhead", "County": "Gwynedd", "Region": "Wales", "Country": "Wales", "Post Code": "LL65 2UX", "X-coordinate": "227015", "Y-coordinate": "380681", "Planning Authority": "Isle of Anglesey County Council", "Planning Application Reference": "OP/2023/8", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.29477", "long": "-4.596967", "status": "planning", "mw": 349, "ext_id": "15472"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 349, "mwh_is_estimate": true, "mwh": 349, "mwh_estimate": 349, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penrhos Works - Battery Energy Storage System", "name_short": "Penrhos Works - Battery", "owner": "Anglesey Land Holdings Limited", "state": "wales", "country": "uk", "lat": "53.29477", "long": "-4.596967", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.29477+-4.596967", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "East Claydon Battery Energy Storage", "city": "", "id": "1299", "external_id": "15501", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1299", "external_id": "15501", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Claydon Battery Energy Storage", "external_id": "15501", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.919985", "long": "-0.902051", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15501", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Statera Energy", "Site Name": "East Claydon Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rookery Farm, Granborough, Buckingham", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "MK18 3NJ", "X-coordinate": "475607", "Y-coordinate": "225176", "Planning Authority": "Buckinghamshire Council - Aylesbury Vale Area", "Planning Application Reference": "23/03875/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.919985", "long": "-0.902051", "status": "planning", "mw": 500, "ext_id": "15501"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15501", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Statera Energy", "Site Name": "East Claydon Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rookery Farm, Granborough, Buckingham", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "MK18 3NJ", "X-coordinate": "475607", "Y-coordinate": "225176", "Planning Authority": "Buckinghamshire Council - Aylesbury Vale Area", "Planning Application Reference": "23/03875/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.919985", "long": "-0.902051", "status": "planning", "mw": 500, "ext_id": "15501"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Claydon Battery Energy Storage", "name_short": "East Claydon", "owner": "Statera Energy", "state": "south east", "country": "uk", "lat": "51.919985", "long": "-0.902051", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.919985+-0.902051", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brockworth Road - Battery Storage System", "city": "", "id": "1300", "external_id": "15518", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1300", "external_id": "15518", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Brockworth Road - Battery Storage System", "external_id": "15518", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Exagen", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.842689", "long": "-2.161915", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15518", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Exagen", "Site Name": "Brockworth Road - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Brockworth Road, N/O The A417 & E/O M5, Gloucester", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL3 4WN", "X-coordinate": "388942", "Y-coordinate": "216022", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "23/01078/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.842689", "long": "-2.161915", "status": "planning", "mw": 20, "ext_id": "15518"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15518", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Exagen", "Site Name": "Brockworth Road - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Brockworth Road, N/O The A417 & E/O M5, Gloucester", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL3 4WN", "X-coordinate": "388942", "Y-coordinate": "216022", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "23/01078/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.842689", "long": "-2.161915", "status": "planning", "mw": 20, "ext_id": "15518"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Brockworth Road - Battery Storage System", "name_short": "Brockworth Road - Battery Storage S...", "owner": "Exagen", "state": "south west", "country": "uk", "lat": "51.842689", "long": "-2.161915", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.842689+-2.161915", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "1301", "external_id": "15544", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "126", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1301", "external_id": "15544", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Derehams Farm, Derehams Lane - Battery Storage", "external_id": "15544", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 126, "power_mw": 126, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15544", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "126", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12649", "Address": "Derehams Farm Derehams Lane Loudwater ", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Buckinghamshire Council - Wycombe Area", "Planning Application Reference": "23/07053/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 126, "ext_id": "15544"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15544", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "126", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12649", "Address": "Derehams Farm Derehams Lane Loudwater ", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Buckinghamshire Council - Wycombe Area", "Planning Application Reference": "23/07053/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 126, "ext_id": "15544"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 126, "mwh_is_estimate": true, "mwh": 126, "mwh_estimate": 126, "status": "planning", "status_class": "", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Derehams Farm, Derehams Lane - Battery Storage", "name_short": "Derehams Farm, Derehams Lane", "owner": "Newton Energi Limited", "state": "south east", "country": "uk", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.611399+-0.693977", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Electricity Substation, Bardarroch - Battery Energy Storage", "city": "", "id": "1302", "external_id": "15569", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1302", "external_id": "15569", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Electricity Substation, Bardarroch - Battery Energy Storage", "external_id": "15569", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 29, "power_mw": 29, "owner": "Balance Power Projects Limited", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.445104", "long": "-4.43125", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15569", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "Electricity Substation, Bardarroch - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Electricity Substation, A70 From B730 To U74 Bardarroch, Ochiltree, Cumnock", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18 2RL", "X-coordinate": "246313", "Y-coordinate": "619492", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0604/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.445104", "long": "-4.43125", "status": "planning", "mw": 29, "ext_id": "15569"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15569", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "Electricity Substation, Bardarroch - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Electricity Substation, A70 From B730 To U74 Bardarroch, Ochiltree, Cumnock", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18 2RL", "X-coordinate": "246313", "Y-coordinate": "619492", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0604/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.445104", "long": "-4.43125", "status": "planning", "mw": 29, "ext_id": "15569"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 29, "mwh_is_estimate": true, "mwh": 29, "mwh_estimate": 29, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Electricity Substation, Bardarroch - Battery Energy Storage", "name_short": "Electricity Substation, Bardarroch", "owner": "Balance Power Projects Limited", "state": "scotland", "country": "uk", "lat": "55.445104", "long": "-4.43125", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.445104+-4.43125", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Toddington Services, Hipsey Spinney - Battery Storage", "city": "", "id": "1303", "external_id": "15573", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "250", "customer": "", "owner": "Kona Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1303", "external_id": "15573", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Toddington Services, Hipsey Spinney - Battery Storage", "external_id": "15573", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 250, "power_mw": 250, "owner": "Kona Energy Limited", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.943939", "long": "-0.501068", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15573", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Kona Energy Limited", "Site Name": "Toddington Services, Hipsey Spinney - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "250", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Toddington Services, W/O The M1 Motorway & E/O Hipsey Spinney, Dunstable", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU5 6HP", "X-coordinate": "503128", "Y-coordinate": "228332", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/23/03787/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.943939", "long": "-0.501068", "status": "planning", "mw": 250, "ext_id": "15573"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15573", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Kona Energy Limited", "Site Name": "Toddington Services, Hipsey Spinney - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "250", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Toddington Services, W/O The M1 Motorway & E/O Hipsey Spinney, Dunstable", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU5 6HP", "X-coordinate": "503128", "Y-coordinate": "228332", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/23/03787/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.943939", "long": "-0.501068", "status": "planning", "mw": 250, "ext_id": "15573"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 250, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Toddington Services, Hipsey Spinney - Battery Storage", "name_short": "Toddington Services, Hipsey Spinney", "owner": "Kona Energy Limited", "state": "eastern", "country": "uk", "lat": "51.943939", "long": "-0.501068", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.943939+-0.501068", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Caterham Bypass - Battery Energy Storage", "city": "", "id": "1304", "external_id": "15574", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Ylem Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1304", "external_id": "15574", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Caterham Bypass - Battery Energy Storage", "external_id": "15574", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Ylem Energy Limited", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.288015", "long": "-0.067535", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15574", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Ylem Energy Limited", "Site Name": "Caterham Bypass - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Caterham Bypass, Caterham", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "CR3 6QW", "X-coordinate": "534854", "Y-coordinate": "156093", "Planning Authority": "Tandridge District Council", "Planning Application Reference": "2023/1430", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.288015", "long": "-0.067535", "status": "planning", "mw": 12, "ext_id": "15574"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15574", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Ylem Energy Limited", "Site Name": "Caterham Bypass - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Caterham Bypass, Caterham", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "CR3 6QW", "X-coordinate": "534854", "Y-coordinate": "156093", "Planning Authority": "Tandridge District Council", "Planning Application Reference": "2023/1430", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.288015", "long": "-0.067535", "status": "planning", "mw": 12, "ext_id": "15574"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Caterham Bypass - Battery Energy Storage", "name_short": "Caterham Bypass", "owner": "Ylem Energy Limited", "state": "south east", "country": "uk", "lat": "51.288015", "long": "-0.067535", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.288015+-0.067535", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "city": "", "id": "1305", "external_id": "15599", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Windel Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1305", "external_id": "15599", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "external_id": "15599", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Windel Energy", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.965523", "long": "-2.96815", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15599", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Windel Energy", "Site Name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ne/O Pine Glen, Westlinton, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 6AL", "X-coordinate": "338113", "Y-coordinate": "563862", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0833", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.965523", "long": "-2.96815", "status": "planning", "mw": 200, "ext_id": "15599"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15599", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Windel Energy", "Site Name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ne/O Pine Glen, Westlinton, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 6AL", "X-coordinate": "338113", "Y-coordinate": "563862", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0833", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.965523", "long": "-2.96815", "status": "planning", "mw": 200, "ext_id": "15599"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "name_short": "Todhills and Westlinton - Harker Ba...", "owner": "Windel Energy", "state": "north west", "country": "uk", "lat": "54.965523", "long": "-2.96815", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.965523+-2.96815", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ipswich Road Cardiff - Battery Storage", "city": "", "id": "1306", "external_id": "15610", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "93", "power_mw": "93", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1306", "external_id": "15610", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ipswich Road, Cardiff - Battery Storage ", "external_id": "15610", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 93, "power_mw": 93, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.498785", "long": "-3.145501", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15610", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Ipswich Road, Cardiff - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "93", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9910", "Address": "First Choice Accident Repair, Ipswich Road, Penylan, Cardiff", "County": "South Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF23 9AQ", "X-coordinate": "320581", "Y-coordinate": "178383", "Planning Authority": "Cardiff Council", "Planning Application Reference": "23/02817/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.498785", "long": "-3.145501", "status": "planning", "mw": 93, "ext_id": "15610"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15610", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Ipswich Road, Cardiff - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "93", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9910", "Address": "First Choice Accident Repair, Ipswich Road, Penylan, Cardiff", "County": "South Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF23 9AQ", "X-coordinate": "320581", "Y-coordinate": "178383", "Planning Authority": "Cardiff Council", "Planning Application Reference": "23/02817/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.498785", "long": "-3.145501", "status": "planning", "mw": 93, "ext_id": "15610"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 93, "mwh_is_estimate": true, "mwh": 93, "mwh_estimate": 93, "status": "planning", "status_class": "", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ipswich Road, Cardiff - Battery Storage ", "name_short": "Ipswich Road, Cardiff - Battery Sto...", "owner": "Green Frog Power 214 Limited", "state": "wales", "country": "uk", "lat": "51.498785", "long": "-3.145501", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.498785+-3.145501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rye Common Lane", "city": "", "id": "1375", "external_id": "7028", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1375", "external_id": "7028", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rye Common Lane", "external_id": "7028", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.249851", "long": "-0.875513", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7028", "Record Last Updated (dd/mm/yyyy)": "14/09/2023", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Rye Common Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7737", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blue Bell Lodge, Rye Common Lane, Crondall, Farnham, Surrey", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DE", "X-coordinate": "478578", "Y-coordinate": "150676", "Planning Authority": "Hart District Council", "Planning Application Reference": "18/01114/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2018", "Planning Application Withdrawn": "30/08/2018", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.249851", "long": "-0.875513", "status": "planning", "mw": 49, "ext_id": "7028"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "7028", "Record Last Updated (dd/mm/yyyy)": "14/09/2023", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Rye Common Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7737", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blue Bell Lodge, Rye Common Lane, Crondall, Farnham, Surrey", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DE", "X-coordinate": "478578", "Y-coordinate": "150676", "Planning Authority": "Hart District Council", "Planning Application Reference": "18/01114/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2018", "Planning Application Withdrawn": "30/08/2018", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.249851", "long": "-0.875513", "status": "planning", "mw": 49, "ext_id": "7028"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rye Common Lane", "name_short": "Rye Common Lane", "owner": "Harmony Energy", "state": "south east", "country": "uk", "lat": "51.249851", "long": "-0.875513", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.249851+-0.875513", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pancross & Oaklands Solar Farm", "city": "", "id": "1376", "external_id": "7702", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Sirius Renewable Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1376", "external_id": "7702", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pancross & Oaklands Solar Farm", "external_id": "7702", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Sirius Renewable Energy", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.452175", "long": "-3.353404", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7702", "Record Last Updated (dd/mm/yyyy)": "20/09/2022", "Operator (or Applicant)": "Sirius Renewable Energy", "Site Name": "Pancross & Oaklands Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7701", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Pancross and Oaklands Farm, near Bonvilston,", "County": "Vale of Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF5 6TQ", "X-coordinate": "306054", "Y-coordinate": "173446", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3245504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.452175", "long": "-3.353404", "status": "planning", "mw": 50, "ext_id": "7702"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "7702", "Record Last Updated (dd/mm/yyyy)": "20/09/2022", "Operator (or Applicant)": "Sirius Renewable Energy", "Site Name": "Pancross & Oaklands Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7701", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Pancross and Oaklands Farm, near Bonvilston,", "County": "Vale of Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF5 6TQ", "X-coordinate": "306054", "Y-coordinate": "173446", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3245504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.452175", "long": "-3.353404", "status": "planning", "mw": 50, "ext_id": "7702"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Pancross & Oaklands Solar Farm", "name_short": "Pancross & Oaklands Solar Farm", "owner": "Sirius Renewable Energy", "state": "wales", "country": "uk", "lat": "51.452175", "long": "-3.353404", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.452175+-3.353404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carlisle Road - Battery Energy Storage System", "city": "", "id": "1377", "external_id": "9684", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1377", "external_id": "9684", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Carlisle Road - Battery Energy Storage System", "external_id": "9684", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Zenobe Energy", "status": "planning", "date_first_heard": "2021-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.59267", "long": "-3.889471", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9684", "Record Last Updated (dd/mm/yyyy)": "23/09/2021", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Carlisle Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coalburn Battery Energy Storage System, Adj Carlisle Road, B7078, Coalburn, Lanark", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0LS", "X-coordinate": "281024", "Y-coordinate": "634847", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004799", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.59267", "long": "-3.889471", "status": "planning", "mw": 200, "ext_id": "9684"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9684", "Record Last Updated (dd/mm/yyyy)": "23/09/2021", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Carlisle Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coalburn Battery Energy Storage System, Adj Carlisle Road, B7078, Coalburn, Lanark", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0LS", "X-coordinate": "281024", "Y-coordinate": "634847", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004799", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.59267", "long": "-3.889471", "status": "planning", "mw": 200, "ext_id": "9684"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2021-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Carlisle Road - Battery Energy Storage System", "name_short": "Carlisle Road - Battery", "owner": "Zenobe Energy", "state": "scotland", "country": "uk", "lat": "55.59267", "long": "-3.889471", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.59267+-3.889471", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chapel Lane - Battery Energy Storage System", "city": "", "id": "1378", "external_id": "9721", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1378", "external_id": "9721", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chapel Lane - Battery Energy Storage System", "external_id": "9721", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco Limited", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.562502", "long": "-1.925062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9721", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Chapel Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15308", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj The Duckery, Chapel Lane, Great Barr, Walsall", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS9 0QU", "X-coordinate": "405177", "Y-coordinate": "296077", "Planning Authority": "Walsall Metropolitan Borough Council", "Planning Application Reference": "21/1720", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "13/12/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.562502", "long": "-1.925062", "status": "planning", "mw": 49, "ext_id": "9721"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9721", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Chapel Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15308", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj The Duckery, Chapel Lane, Great Barr, Walsall", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS9 0QU", "X-coordinate": "405177", "Y-coordinate": "296077", "Planning Authority": "Walsall Metropolitan Borough Council", "Planning Application Reference": "21/1720", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "13/12/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.562502", "long": "-1.925062", "status": "planning", "mw": 49, "ext_id": "9721"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chapel Lane - Battery Energy Storage System", "name_short": "Chapel Lane - Battery", "owner": "Anesco Limited", "state": "west midlands", "country": "uk", "lat": "52.562502", "long": "-1.925062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.562502+-1.925062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Glenniston Farm, Auchtertool - Solar Farm", "city": "", "id": "1380", "external_id": "10434", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Locogen Consulting Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1380", "external_id": "10434", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Glenniston Farm, Auchtertool - Solar Farm", "external_id": "10434", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Locogen Consulting Limited", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10434", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Locogen Consulting Limited", "Site Name": "Glenniston Farm, Auchtertool - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10433", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Glenniston Farm Gleniston Auchtertool Lochgelly", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "23/02598/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 10, "ext_id": "10434"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10434", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Locogen Consulting Limited", "Site Name": "Glenniston Farm, Auchtertool - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10433", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Glenniston Farm Gleniston Auchtertool Lochgelly", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "23/02598/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 10, "ext_id": "10434"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Glenniston Farm, Auchtertool - Solar Farm", "name_short": "Glenniston Farm, Auchtertool - Sola...", "owner": "Locogen Consulting Limited", "state": "scotland", "country": "uk", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.11287+-3.271262", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Culachy Wind Farm", "city": "", "id": "1381", "external_id": "10714", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Fred Olsen Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1381", "external_id": "10714", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Culachy Wind Farm", "external_id": "10714", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Fred Olsen Renewables Limited", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.138992", "long": "-4.661529", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10714", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Fred Olsen Renewables Limited", "Site Name": "Culachy Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10713", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "3926", "Address": "6.5km S/O Fort Augustus", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH32 4BZ", "X-coordinate": "239039", "Y-coordinate": "808487", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003423", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.138992", "long": "-4.661529", "status": "planning", "mw": 10, "ext_id": "10714"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10714", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Fred Olsen Renewables Limited", "Site Name": "Culachy Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10713", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "3926", "Address": "6.5km S/O Fort Augustus", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH32 4BZ", "X-coordinate": "239039", "Y-coordinate": "808487", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003423", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.138992", "long": "-4.661529", "status": "planning", "mw": 10, "ext_id": "10714"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Culachy Wind Farm", "name_short": "Culachy Wind Farm", "owner": "Fred Olsen Renewables Limited", "state": "scotland", "country": "uk", "lat": "57.138992", "long": "-4.661529", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.138992+-4.661529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Printworks Road - Stalybridge Battery Storage", "city": "", "id": "1382", "external_id": "10808", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1382", "external_id": "10808", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Printworks Road - Stalybridge Battery Storage", "external_id": "10808", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "Zenobe Energy", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.494465", "long": "-2.043372", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10808", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Printworks Road - Stalybridge Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Stalybridge Substation Printworks Road Stalybridge ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK15 3BD", "X-coordinate": "397220", "Y-coordinate": "399752", "Planning Authority": "Tameside Metropolitan Borough", "Planning Application Reference": "23/00770/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.494465", "long": "-2.043372", "status": "planning", "mw": 150, "ext_id": "10808"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10808", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Printworks Road - Stalybridge Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Stalybridge Substation Printworks Road Stalybridge ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK15 3BD", "X-coordinate": "397220", "Y-coordinate": "399752", "Planning Authority": "Tameside Metropolitan Borough", "Planning Application Reference": "23/00770/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.494465", "long": "-2.043372", "status": "planning", "mw": 150, "ext_id": "10808"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Printworks Road - Stalybridge Battery Storage", "name_short": "Printworks Road - Stalybridge", "owner": "Zenobe Energy", "state": "north west", "country": "uk", "lat": "53.494465", "long": "-2.043372", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.494465+-2.043372", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Watten Wind Farm", "city": "", "id": "1383", "external_id": "11480", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1383", "external_id": "11480", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Watten Wind Farm", "external_id": "11480", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2022-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.470559", "long": "-3.30353", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11480", "Record Last Updated (dd/mm/yyyy)": "17/06/2022", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Watten Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11479", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O Watten, Caithness", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW1 5YL", "X-coordinate": "324063", "Y-coordinate": "954328", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00004509", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.470559", "long": "-3.30353", "status": "planning", "mw": 20, "ext_id": "11480"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11480", "Record Last Updated (dd/mm/yyyy)": "17/06/2022", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Watten Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11479", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O Watten, Caithness", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW1 5YL", "X-coordinate": "324063", "Y-coordinate": "954328", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00004509", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.470559", "long": "-3.30353", "status": "planning", "mw": 20, "ext_id": "11480"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Watten Wind Farm", "name_short": "Watten Wind Farm", "owner": "EDF Energy Renewables", "state": "scotland", "country": "uk", "lat": "58.470559", "long": "-3.30353", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.470559+-3.30353", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ben Aketil Wind Farm - Repowered & Extended", "city": "", "id": "1384", "external_id": "11876", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Falck Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1384", "external_id": "11876", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ben Aketil Wind Farm - Repowered & Extended", "external_id": "11876", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Falck Renewables Limited", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.148168", "long": "-6.104436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11876", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Falck Renewables Limited", "Site Name": "Ben Aketil Wind Farm - Repowered & Extended", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11875", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ben Aketil, Dunvegan, Isle of Skye", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV49 9BJ", "X-coordinate": "151835", "Y-coordinate": "813841", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004552", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.148168", "long": "-6.104436", "status": "planning", "mw": 20, "ext_id": "11876"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11876", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Falck Renewables Limited", "Site Name": "Ben Aketil Wind Farm - Repowered & Extended", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11875", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ben Aketil, Dunvegan, Isle of Skye", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV49 9BJ", "X-coordinate": "151835", "Y-coordinate": "813841", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004552", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.148168", "long": "-6.104436", "status": "planning", "mw": 20, "ext_id": "11876"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ben Aketil Wind Farm - Repowered & Extended", "name_short": "Ben Aketil Wind Farm - Repowered & ...", "owner": "Falck Renewables Limited", "state": "scotland", "country": "uk", "lat": "57.148168", "long": "-6.104436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.148168+-6.104436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "city": "", "id": "1385", "external_id": "11999", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Assured Asset Solar 2 Limited (Peridot Solar)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1385", "external_id": "11999", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "external_id": "11999", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Assured Asset Solar 2 Limited (Peridot Solar)", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.093458", "long": "-0.846868", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11999", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Assured Asset Solar 2 Limited (Peridot Solar)", "Site Name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11998", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The W/O Main Street, Kelham, Newark", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG23 5QP", "X-coordinate": "477318", "Y-coordinate": "355760", "Planning Authority": "Newark & Sherwood District Council", "Planning Application Reference": "23/01837/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.093458", "long": "-0.846868", "status": "planning", "mw": 50, "ext_id": "11999"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11999", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Assured Asset Solar 2 Limited (Peridot Solar)", "Site Name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11998", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The W/O Main Street, Kelham, Newark", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG23 5QP", "X-coordinate": "477318", "Y-coordinate": "355760", "Planning Authority": "Newark & Sherwood District Council", "Planning Application Reference": "23/01837/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.093458", "long": "-0.846868", "status": "planning", "mw": 50, "ext_id": "11999"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "name_short": "Main Street, Kelham - Solar Farm &", "owner": "Assured Asset Solar 2 Limited (Peridot Solar)", "state": "east midlands", "country": "uk", "lat": "53.093458", "long": "-0.846868", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.093458+-0.846868", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "city": "", "id": "1386", "external_id": "12024", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Resources Unlimited LLP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1386", "external_id": "12024", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "external_id": "12024", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Resources Unlimited LLP", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.808132", "long": "-4.369304", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12024", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Resources Unlimited LLP", "Site Name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60.8", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Saturland Farm, 168 Salterland Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G78 1TF", "X-coordinate": "251610", "Y-coordinate": "659747", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004590", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.808132", "long": "-4.369304", "status": "planning", "mw": 60, "ext_id": "12024"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12024", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Resources Unlimited LLP", "Site Name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60.8", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Saturland Farm, 168 Salterland Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G78 1TF", "X-coordinate": "251610", "Y-coordinate": "659747", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004590", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.808132", "long": "-4.369304", "status": "planning", "mw": 60, "ext_id": "12024"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "name_short": "Saturland Farm, Salterland Road - B...", "owner": "Resources Unlimited LLP", "state": "scotland", "country": "uk", "lat": "55.808132", "long": "-4.369304", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.808132+-4.369304", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "city": "", "id": "1387", "external_id": "12026", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1387", "external_id": "12026", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "external_id": "12026", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "RES Limited", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.064168", "long": "-2.477187", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12026", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "RES Limited", "Site Name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12025", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hill of Fare, Banchory", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB31 5DA", "X-coordinate": "371160", "Y-coordinate": "797115", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004592", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.064168", "long": "-2.477187", "status": "planning", "mw": 100, "ext_id": "12026"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12026", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "RES Limited", "Site Name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12025", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hill of Fare, Banchory", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB31 5DA", "X-coordinate": "371160", "Y-coordinate": "797115", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004592", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.064168", "long": "-2.477187", "status": "planning", "mw": 100, "ext_id": "12026"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "name_short": "Hill of Fare - Hill of Fare Wind Fa...", "owner": "RES Limited", "state": "scotland", "country": "uk", "lat": "57.064168", "long": "-2.477187", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.064168+-2.477187", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Loch Fergus Farm - Energy Storage System", "city": "", "id": "1388", "external_id": "12274", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Locogen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1388", "external_id": "12274", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Loch Fergus Farm - Energy Storage System", "external_id": "12274", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Locogen", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.433174", "long": "-4.544446", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12274", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": "Locogen", "Site Name": "Loch Fergus Farm - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12273", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Loch Fergus Farm", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 6ER", "X-coordinate": "239106", "Y-coordinate": "618421", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.433174", "long": "-4.544446", "status": "planning", "mw": 45, "ext_id": "12274"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12274", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": "Locogen", "Site Name": "Loch Fergus Farm - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12273", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Loch Fergus Farm", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 6ER", "X-coordinate": "239106", "Y-coordinate": "618421", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.433174", "long": "-4.544446", "status": "planning", "mw": 45, "ext_id": "12274"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Loch Fergus Farm - Energy Storage System", "name_short": "Loch Fergus Farm", "owner": "Locogen", "state": "scotland", "country": "uk", "lat": "55.433174", "long": "-4.544446", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.433174+-4.544446", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "city": "", "id": "1389", "external_id": "12350", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Relay Balbeggie Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1389", "external_id": "12350", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "external_id": "12350", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Relay Balbeggie Limited", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.15179", "long": "-3.158397", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12350", "Record Last Updated (dd/mm/yyyy)": "30/08/2023", "Operator (or Applicant)": "Relay Balbeggie Limited", "Site Name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "300M East Of Wester Balbeggie Cottages Wester Balbeggie Farm Balbeggie Avenue Balbeggie Thornton", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1 3NS", "X-coordinate": "328135", "Y-coordinate": "696060", "Planning Authority": "Fife Council", "Planning Application Reference": "23/00701/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.15179", "long": "-3.158397", "status": "planning", "mw": 49, "ext_id": "12350"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12350", "Record Last Updated (dd/mm/yyyy)": "30/08/2023", "Operator (or Applicant)": "Relay Balbeggie Limited", "Site Name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "300M East Of Wester Balbeggie Cottages Wester Balbeggie Farm Balbeggie Avenue Balbeggie Thornton", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1 3NS", "X-coordinate": "328135", "Y-coordinate": "696060", "Planning Authority": "Fife Council", "Planning Application Reference": "23/00701/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.15179", "long": "-3.158397", "status": "planning", "mw": 49, "ext_id": "12350"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "name_short": "Wester Balbeggie Farm, Balbeggie Av...", "owner": "Relay Balbeggie Limited", "state": "scotland", "country": "uk", "lat": "56.15179", "long": "-3.158397", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.15179+-3.158397", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Supernode Stage 1", "city": "brisbane", "id": "1390", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "520", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.318405", "long": "152.969631", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "link2": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link3": "https://x.com/FredericLambert/status/1811399467070894094", "link4": ""}, "internal_id": "1390", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 520, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Supernode Stage 1", "name_short": "Supernode Stage 1", "owner": "Quinbrook", "state": "queensland", "country": "australia", "lat": "-27.318405", "long": "152.969631", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.318405+152.969631", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer"], "links": ["https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "https://x.com/FredericLambert/status/1811399467070894094"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Supernode Stage 2", "city": "brisbane", "id": "1391", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "1040", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.320103", "long": "152.970537", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link2": "https://x.com/FredericLambert/status/1811399467070894094", "link3": "", "link4": ""}, "internal_id": "1391", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 1040, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Supernode Stage 2", "name_short": "Supernode Stage 2", "owner": "Quinbrook", "state": "queensland", "country": "australia", "lat": "-27.320103", "long": "152.970537", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.320103+152.970537", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer"], "links": ["https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "https://x.com/FredericLambert/status/1811399467070894094"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}]; + var projects = [{"csv": {"name": "Sendai", "city": "sendai", "id": "1374", "external_id": "", "state": "miyagi", "country": "japan", "capacity_mwh": "43", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Kenes", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "14", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.271948", "long": "140.833529", "coords_hint": "3", "use_case": "", "notes": "guessed the mw, assuming it is a 4h system", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1802738958679285856", "link2": "", "link3": "", "link4": ""}, "internal_id": "1374", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 11, "mwh_is_estimate": false, "mwh": 43, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "month_disappeared": "", "go_live": "2024-06", "go_live_year_int": 2024, "name": "Sendai", "name_short": "Sendai", "owner": "Kenes", "state": "miyagi", "country": "japan", "lat": "38.271948", "long": "140.833529", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.271948+140.833529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 14, "notes_split": ["guessed the mw, assuming it is a 4h system"], "links": ["https://x.com/Tesla_Megapack/status/1802738958679285856"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Azure Sky Wind Project, LLC Hybrid", "city": "", "id": "242", "external_id": "64164", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "120", "customer": "", "owner": "Azure Sky Wind Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "242", "external_id": "64164", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Azure Sky Wind Project, LLC Hybrid", "external_id": "64164", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 240, "power_mw": 120, "owner": "Azure Sky Wind Project, LLC", "status": "operation", "date_first_heard": "2020-12", "start_construction": "", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ASWBE": {"first": {"year": "2022", "month": "3", "entity id": "63784", "entity name": "Azure Sky Wind Project, LLC", "plant producer type": "IPP", "plant name": "Azure Sky Wind Project, LLC Hybrid", "plant state": "TX", "plant id": "64164", "generator id": "ASWBE", "net summer capacity (mw)": "120", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64164", "date": "2022-03", "mw": 120}, "first_month": "2020-12", "changes": [{"month": "2022-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-09", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-05", "to": "2024-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "4", "entity id": "63784", "entity name": "Azure Sky Wind Project, LLC", "plant producer type": "IPP", "plant name": "Azure Sky Wind Project, LLC Hybrid", "plant state": "TX", "plant id": "64164", "generator id": "ASWBE", "net summer capacity (mw)": "120", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64164", "date": "2024-04", "mw": 120}, "current_month": "2024-06", "dates": {"first_heard": "2020-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 120, "mwh_is_estimate": true, "mwh": 240, "mwh_estimate": 240, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-12", "start_construction": "", "start_operation": "2024-04", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Azure Sky Wind Project, LLC Hybrid", "name_short": "Azure Sky Wind Project", "owner": "Azure Sky Wind Project, LLC", "state": "texas", "country": "usa", "lat": "33.526939371284264", "long": "-95.1731198926975", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.526939371284264+-95.1731198926975", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ranchland Wind Storage", "city": "", "id": "250", "external_id": "64545", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "146", "power_mw": "73", "customer": "", "owner": "Ranchland Wind Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "250", "external_id": "64545", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ranchland Wind Storage", "external_id": "64545", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 146, "power_mw": 73, "owner": "Ranchland Wind Storage, LLC", "status": "operation", "date_first_heard": "2021-05", "start_construction": "2021-12", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "3", "entity id": "64179", "entity name": "Ranchland Wind Storage, LLC", "plant producer type": "IPP", "plant name": "Ranchland Wind Storage", "plant state": "TX", "plant id": "64545", "generator id": "BA", "net summer capacity (mw)": "73", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64545", "date": "2022-03", "mw": 73}, "first_month": "2021-05", "changes": [{"month": "2021-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-05", "to": "2022-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2023-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-05", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-05", "to": "2024-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "4", "entity id": "64179", "entity name": "Ranchland Wind Storage, LLC", "plant producer type": "IPP", "plant name": "Ranchland Wind Storage", "plant state": "TX", "plant id": "64545", "generator id": "BA", "net summer capacity (mw)": "73", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64545", "date": "2024-04", "mw": 73}, "current_month": "2024-06", "dates": {"first_heard": "2021-05", "start_construction": "2021-12"}, "month_disappeared": ""}}, "mw": 73, "mwh_is_estimate": true, "mwh": 146, "mwh_estimate": 146, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-05", "start_construction": "2021-12", "start_operation": "2024-04", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Ranchland Wind Storage", "name_short": "Ranchland Wind", "owner": "Ranchland Wind Storage, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.373438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.373438", "construction_time_month": 28, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Zier Solar", "city": "", "id": "863", "external_id": "66137", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Cypress Creek Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "863", "external_id": "66137", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Zier Solar", "external_id": "66137", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Cypress Creek Renewables", "status": "operation", "date_first_heard": "2023-01", "start_construction": "", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"11023": {"first": {"year": "2024", "month": "2", "entity id": "61060", "entity name": "Cypress Creek Renewables", "plant producer type": "IPP", "plant name": "Zier Solar", "plant state": "TX", "plant id": "66137", "generator id": "11023", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66137", "date": "2024-02", "mw": 40}, "first_month": "2023-01", "changes": [{"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "4", "entity id": "61060", "entity name": "Cypress Creek Renewables", "plant producer type": "IPP", "plant name": "Zier Solar", "plant state": "TX", "plant id": "66137", "generator id": "11023", "net summer capacity (mw)": "40.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66137", "date": "2024-04", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-01", "start_construction": "", "start_operation": "2024-04", "start_estimated": "2024-02", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Zier Solar", "name_short": "Zier Solar", "owner": "Cypress Creek Renewables", "state": "texas", "country": "usa", "lat": "33.60453116095374", "long": "-95.1641099430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.60453116095374+-95.1641099430736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sunlight Storage II", "city": "", "id": "948", "external_id": "66575", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Sunlight Storage II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "948", "external_id": "66575", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sunlight Storage II", "external_id": "66575", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 460, "power_mw": 230, "owner": "Sunlight Storage II", "status": "operation", "date_first_heard": "2023-05", "start_construction": "2023-09", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SUNS2": {"first": {"year": "2024", "month": "4", "entity id": "65625", "entity name": "Sunlight Storage II", "plant producer type": "IPP", "plant name": "Sunlight Storage II", "plant state": "CA", "plant id": "66575", "generator id": "SUNS2", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66575", "date": "2024-04", "mw": 230}, "first_month": "2023-05", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "4", "entity id": "65625", "entity name": "Sunlight Storage II", "plant producer type": "IPP", "plant name": "Sunlight Storage II", "plant state": "CA", "plant id": "66575", "generator id": "SUNS2", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66575", "date": "2024-04", "mw": 230}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 230, "mwh_is_estimate": true, "mwh": 460, "mwh_estimate": 460, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-05", "start_construction": "2023-09", "start_operation": "2024-04", "start_estimated": "2024-04", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Sunlight Storage II", "name_short": "Sunlight Storage II", "owner": "Sunlight Storage II", "state": "california", "country": "usa", "lat": "41.273150024586876", "long": "-121.50715735055999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.273150024586876+-121.50715735055999", "construction_time_month": 7, "construction_speed_mwh_per_month": 65, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Proxima", "city": "", "id": "952", "external_id": "66270", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "324", "power_mw": "162", "customer": "", "owner": "Proxima Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "952", "external_id": "66270", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Proxima", "external_id": "66270", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 324, "power_mw": 162, "owner": "Proxima Solar, LLC", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-06", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PRXBS": {"first": {"year": "2023", "month": "9", "entity id": "65394", "entity name": "Proxima Solar, LLC", "plant producer type": "IPP", "plant name": "Proxima", "plant state": "CA", "plant id": "66270", "generator id": "PRXBS", "net summer capacity (mw)": "162", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66270", "date": "2023-09", "mw": 162}, "first_month": "2023-03", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-10", "to": "2024-01", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "4", "entity id": "65394", "entity name": "Proxima Solar, LLC", "plant producer type": "IPP", "plant name": "Proxima", "plant state": "CA", "plant id": "66270", "generator id": "PRXBS", "net summer capacity (mw)": "162", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66270", "date": "2024-04", "mw": 162}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-06"}, "month_disappeared": ""}}, "mw": 162, "mwh_is_estimate": true, "mwh": 324, "mwh_estimate": 324, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-06", "start_operation": "2024-04", "start_estimated": "2023-10", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Proxima", "name_short": "Proxima", "owner": "Proxima Solar, LLC", "state": "california", "country": "usa", "lat": "41.03803592366989", "long": "-121.41654744719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.03803592366989+-121.41654744719", "construction_time_month": 10, "construction_speed_mwh_per_month": 32, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sky Ranch Solar and Storage", "city": "", "id": "1047", "external_id": "66814", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Sky Ranch Solar and Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1047", "external_id": "66814", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sky Ranch Solar", "external_id": "66814", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Sky Ranch Solar and Storage", "status": "operation", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2024-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SKYBA": {"first": {"year": "2024", "month": "3", "entity id": "65781", "entity name": "Sky Ranch Solar and Storage", "plant producer type": "IPP", "plant name": "Sky Ranch Solar and Storage", "plant state": "NM", "plant id": "66814", "generator id": "SKYBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66814", "date": "2024-03", "mw": 50}, "first_month": "2023-08", "changes": [{"month": "2024-05", "li": [{"name": "plant name", "from": "Sky Ranch Solar and Storage", "to": "Sky Ranch Solar", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "4", "entity id": "65781", "entity name": "Sky Ranch Solar and Storage", "plant producer type": "IPP", "plant name": "Sky Ranch Solar", "plant state": "NM", "plant id": "66814", "generator id": "SKYBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66814", "date": "2024-04", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2024-04", "start_estimated": "2024-03", "month_disappeared": "", "go_live": "2024-04", "go_live_year_int": 2024, "name": "Sky Ranch Solar", "name_short": "Sky Ranch Solar", "owner": "Sky Ranch Solar and Storage", "state": "new mexico", "country": "usa", "lat": "36.63917097668374", "long": "-103.81552074903644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.63917097668374+-103.81552074903644", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clay Tye", "city": "Upminster", "id": "76", "external_id": "", "state": "essex", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures (FRV)", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552193", "long": "0.297889", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "link2": "https://x.com/Tesla_Megapack/status/1775254497973202985", "link3": "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/", "link4": ""}, "internal_id": "76", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 99, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Clay Tye", "name_short": "Clay Tye", "owner": "", "state": "essex", "country": "uk", "lat": "51.552193", "long": "0.297889", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.552193+0.297889", "construction_time_month": 30, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "https://x.com/Tesla_Megapack/status/1775254497973202985", "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Gemini", "city": "Las Vegas", "id": "105", "external_id": "63352", "state": "nevada", "country": "usa", "capacity_mwh": "1400", "estimate_mwh": "", "power_mw": "380", "customer": "", "owner": "Primergy Solar (Quinbrook)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-13", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "cost_million": "1000", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.474167", "long": "-114.784706", "coords_hint": "1", "use_case": "690MW solar farm support", "notes": "from the planning docs, it seems battery containers will be split out across the solar farm, that is why the location was set to exact", "project_website": "https://www.primergysolar.com/portfolio", "link1": "https://www.energy-storage.news/us-dept-of-interior-approves-690mw-nevada-solar-plant-with-1400mwh-energy-storage-component/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/100498/570", "link3": "", "link4": ""}, "internal_id": "105", "external_id": "63352", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gemini Solar", "external_id": "63352", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 760, "power_mw": 380, "owner": "Gemini Solar", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARPV1": {"first": {"year": "2023", "month": "11", "entity id": "63117", "entity name": "Gemini Solar", "plant producer type": "IPP", "plant name": "Gemini Solar", "plant state": "NV", "plant id": "63352", "generator id": "ARPV1", "net summer capacity (mw)": "280", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63352", "date": "2023-11", "mw": 280}, "first_month": "2020-09", "changes": [{"month": "2023-01", "li": [{"name": "mw", "from": 280, "to": 380, "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "63117", "entity name": "Gemini Solar", "plant producer type": "IPP", "plant name": "Gemini Solar", "plant state": "NV", "plant id": "63352", "generator id": "ARPV1", "net summer capacity (mw)": "380", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63352", "date": "2024-03", "mw": 380}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 380, "mwh_is_estimate": false, "mwh": 1400, "mwh_estimate": 760, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2024-03", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Gemini Solar", "name_short": "Gemini Solar", "owner": "Gemini Solar", "state": "nevada", "country": "usa", "lat": "36.474167", "long": "-114.784706", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.474167+-114.784706", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["from the planning docs, it seems battery containers will be split out across the solar farm, that is why the location was set to exact"], "links": ["https://www.energy-storage.news/us-dept-of-interior-approves-690mw-nevada-solar-plant-with-1400mwh-energy-storage-component/", "https://eplanning.blm.gov/eplanning-ui/project/100498/570"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jamesfield Farm", "city": "Abernethy", "id": "130", "external_id": "10863", "state": "fife", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "Tag Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "26", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://www.harmonyenergyplanning.co.uk/jamesfield/", "link3": "", "link4": ""}, "internal_id": "130", "external_id": "10863", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Jamesfield Organic Centre - Battery Storage", "external_id": "10863", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "construction", "date_first_heard": "2022-09-28", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10863", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7315 & 10456", "Address": "140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/00832/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "planning", "mw": 49, "ext_id": "10863"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2022", "to": "12/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2025", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "28/09/2025", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2023", "to": "24/03/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10863", "Record Last Updated (dd/mm/yyyy)": "24/03/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7315 & 10456", "Address": "140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/00832/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "construction", "mw": 49, "ext_id": "10863"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-07", "start_construction": "2023-01-12", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09-28", "start_construction": "2023-01-01", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Jamesfield Organic Centre - Battery Storage", "name_short": "Jamesfield Organic Centre", "owner": "Harmony Energy Storage", "state": "scotland", "country": "uk", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.347678+-3.298351", "construction_time_month": 14, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 26, "notes_split": ["extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article"], "links": ["https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "https://www.harmonyenergyplanning.co.uk/jamesfield/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "AES West Oahu Solar Hybrid", "city": "", "id": "219", "external_id": "64656", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "12.5", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "219", "external_id": "64656", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES West Oahu Solar Hybrid", "external_id": "64656", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2022-09", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UHBES": {"first": {"year": "2022", "month": "9", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES West Oahu Solar Hybrid", "plant state": "HI", "plant id": "64656", "generator id": "UHBES", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64656", "date": "2022-09", "mw": 12}, "first_month": "2021-06", "changes": [{"month": "2022-06", "li": [{"name": "date", "from": "2022-09", "to": "2023-01", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2023-01", "to": "2023-06", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2024-01", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES West Oahu Solar Hybrid", "plant state": "HI", "plant id": "64656", "generator id": "UHBES", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64656", "date": "2024-03", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2022-09", "start_operation": "2024-03", "start_estimated": "2022-09", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "AES West Oahu Solar Hybrid", "name_short": "AES West Oahu Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.54447929522626", "long": "-155.30620467944766", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.54447929522626+-155.30620467944766", "construction_time_month": 18, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cameron Wind 1 LLC", "city": "", "id": "563", "external_id": "59118", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "24", "customer": "", "owner": "Cameron Wind 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "563", "external_id": "59118", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cameron Wind 1 LLC", "external_id": "59118", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 32, "power_mw": 16, "owner": "Cameron Wind 1 LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "2023-05", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SABAL": {"first": {"year": "2022", "month": "10", "entity id": "58939", "entity name": "Cameron Wind 1 LLC", "plant producer type": "IPP", "plant name": "Cameron Wind 1 LLC", "plant state": "TX", "plant id": "59118", "generator id": "SABAL", "net summer capacity (mw)": "24", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "59118", "date": "2022-10", "mw": 24}, "first_month": "2021-11", "changes": [{"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2023-06", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}, {"name": "mw", "from": 24, "to": 16, "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "58939", "entity name": "Cameron Wind 1 LLC", "plant producer type": "IPP", "plant name": "Cameron Wind 1 LLC", "plant state": "TX", "plant id": "59118", "generator id": "SABAL", "net summer capacity (mw)": "16.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59118", "date": "2024-03", "mw": 16}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 16, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "2023-05", "start_operation": "2024-03", "start_estimated": "2022-10", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Cameron Wind 1 LLC", "name_short": "Cameron Wind 1", "owner": "Cameron Wind 1 LLC", "state": "texas", "country": "usa", "lat": "33.60453116095374", "long": "-95.1641099430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.60453116095374+-95.1641099430736", "construction_time_month": 10, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kogan Creek / Chinchilla", "city": "", "id": "691", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "CS Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "80", "status": "operation", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "cost_million": "150", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-26.917756", "long": "150.746113", "coords_hint": "2", "use_case": "", "notes": "used day of tweet as operation start date", "project_website": "", "link1": "https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "link2": "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "link3": "https://twitter.com/SawyerMerritt/status/1764791615061668146", "link4": ""}, "internal_id": "691", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Kogan Creek / Chinchilla", "name_short": "Kogan Creek / Chinchilla", "owner": "", "state": "queensland", "country": "australia", "lat": "-26.917756", "long": "150.746113", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-26.917756+150.746113", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 80, "notes_split": ["used day of tweet as operation start date"], "links": ["https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "https://twitter.com/SawyerMerritt/status/1764791615061668146"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Arica Solar", "city": "", "id": "699", "external_id": "65744", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "272", "power_mw": "136", "customer": "", "owner": "Arica Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "699", "external_id": "65744", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arica Solar", "external_id": "65744", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 272, "power_mw": 136, "owner": "Arica Solar, LLC", "status": "operation", "date_first_heard": "2022-08", "start_construction": "2022-10", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARCBA": {"first": {"year": "2022", "month": "12", "entity id": "64996", "entity name": "Arica Solar, LLC", "plant producer type": "IPP", "plant name": "Arica Solar", "plant state": "CA", "plant id": "65744", "generator id": "ARCBA", "net summer capacity (mw)": "136", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65744", "date": "2022-12", "mw": 136}, "first_month": "2022-08", "changes": [{"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2023-11", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "64996", "entity name": "Arica Solar, LLC", "plant producer type": "IPP", "plant name": "Arica Solar", "plant state": "CA", "plant id": "65744", "generator id": "ARCBA", "net summer capacity (mw)": "136", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65744", "date": "2024-03", "mw": 136}, "current_month": "2024-06", "dates": {"first_heard": "2022-08", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 136, "mwh_is_estimate": true, "mwh": 272, "mwh_estimate": 272, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "2022-10", "start_operation": "2024-03", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Arica Solar", "name_short": "Arica Solar", "owner": "Arica Solar, LLC", "state": "california", "country": "usa", "lat": "41.005868576126275", "long": "-120.94054963684043", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.005868576126275+-120.94054963684043", "construction_time_month": 17, "construction_speed_mwh_per_month": 16, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Victory Pass", "city": "", "id": "709", "external_id": "65743", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Victory Pass I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "709", "external_id": "65743", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Victory Pass", "external_id": "65743", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Victory Pass I, LLC", "status": "operation", "date_first_heard": "2022-08", "start_construction": "2022-10", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"VCTBA": {"first": {"year": "2022", "month": "11", "entity id": "64995", "entity name": "Victory Pass I, LLC", "plant producer type": "IPP", "plant name": "Victory Pass", "plant state": "CA", "plant id": "65743", "generator id": "VCTBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65743", "date": "2022-11", "mw": 50}, "first_month": "2022-08", "changes": [{"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-11", "to": "2023-11", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "64995", "entity name": "Victory Pass I, LLC", "plant producer type": "IPP", "plant name": "Victory Pass", "plant state": "CA", "plant id": "65743", "generator id": "VCTBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65743", "date": "2024-03", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2022-08", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "2022-10", "start_operation": "2024-03", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Victory Pass", "name_short": "Victory Pass", "owner": "Victory Pass I, LLC", "state": "california", "country": "usa", "lat": "41.183862364886245", "long": "-121.48835819022644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.183862364886245+-121.48835819022644", "construction_time_month": 17, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clairemont Energy Storage", "city": "", "id": "935", "external_id": "66266", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "935", "external_id": "66266", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Clairemont Energy Storage", "external_id": "66266", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-02", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "8", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Clairemont Energy Storage", "plant state": "CA", "plant id": "66266", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66266", "date": "2023-08", "mw": 10}, "first_month": "2023-02", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Clairemont Energy Storage", "plant state": "CA", "plant id": "66266", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66266", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Clairemont Energy Storage", "name_short": "Clairemont", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "40.952677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.952677+-121.300049", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Paradise Energy Storage", "city": "", "id": "936", "external_id": "66265", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "936", "external_id": "66265", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Paradise Energy Storage", "external_id": "66265", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-02", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "8", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Paradise Energy Storage", "plant state": "CA", "plant id": "66265", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66265", "date": "2023-08", "mw": 10}, "first_month": "2023-02", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Paradise Energy Storage", "plant state": "CA", "plant id": "66265", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66265", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Paradise Energy Storage", "name_short": "Paradise", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "40.94007414887133", "long": "-121.24071773708002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94007414887133+-121.24071773708002", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Melrose BESS", "city": "", "id": "961", "external_id": "66281", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "961", "external_id": "66281", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Melrose BESS", "external_id": "66281", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Melrose BESS", "plant state": "CA", "plant id": "66281", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66281", "date": "2023-07", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Melrose BESS", "plant state": "CA", "plant id": "66281", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66281", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}, "2": {"first": {"year": "2023", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Melrose BESS", "plant state": "CA", "plant id": "66281", "generator id": "2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66281", "date": "2023-07", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Melrose BESS", "plant state": "CA", "plant id": "66281", "generator id": "2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66281", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Melrose BESS", "name_short": "Melrose", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.16655741320125", "long": "-121.16499897468609", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.16655741320125+-121.16499897468609", "construction_time_month": 11, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pala Gomez Creek BESS", "city": "", "id": "962", "external_id": "66280", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "962", "external_id": "66280", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pala Gomez Creek BESS", "external_id": "66280", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Pala Gomez Creek BESS", "plant state": "CA", "plant id": "66280", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66280", "date": "2023-07", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Pala Gomez Creek BESS", "plant state": "CA", "plant id": "66280", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66280", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Pala Gomez Creek BESS", "name_short": "Pala Gomez Creek", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.21907378137597", "long": "-121.1673702129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.21907378137597+-121.1673702129225", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Boulevard Energy Storage", "city": "", "id": "963", "external_id": "66279", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "963", "external_id": "66279", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Boulevard Energy Storage", "external_id": "66279", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "8", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Boulevard Energy Storage", "plant state": "CA", "plant id": "66279", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66279", "date": "2023-08", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Boulevard Energy Storage", "plant state": "CA", "plant id": "66279", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66279", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Boulevard Energy Storage", "name_short": "Boulevard", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.273154160953744", "long": "-121.1907209430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.273154160953744+-121.1907209430736", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elliott Energy Storage", "city": "", "id": "964", "external_id": "66278", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "964", "external_id": "66278", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elliott Energy Storage", "external_id": "66278", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "8", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Elliott Energy Storage", "plant state": "CA", "plant id": "66278", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66278", "date": "2023-08", "mw": 10}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Elliott Energy Storage", "plant state": "CA", "plant id": "66278", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66278", "date": "2024-03", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-04", "start_operation": "2024-03", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Elliott Energy Storage", "name_short": "Elliott", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.32049675538939", "long": "-121.23577346517001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.32049675538939+-121.23577346517001", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "St. Gall Energy Storage I", "city": "", "id": "992", "external_id": "66336", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "St. Gall Energy Storage I", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "992", "external_id": "66336", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "St. Gall Energy Storage I", "external_id": "66336", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "St. Gall Energy Storage I", "status": "operation", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SGES1": {"first": {"year": "2023", "month": "12", "entity id": "65426", "entity name": "St. Gall Energy Storage I", "plant producer type": "IPP", "plant name": "St. Gall Energy Storage I", "plant state": "TX", "plant id": "66336", "generator id": "SGES1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66336", "date": "2023-12", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-04", "to": "2024-03", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "3", "entity id": "65426", "entity name": "St. Gall Energy Storage I", "plant producer type": "IPP", "plant name": "St. Gall Energy Storage I", "plant state": "TX", "plant id": "66336", "generator id": "SGES1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66336", "date": "2024-03", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "2024-03", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "St. Gall Energy Storage I", "name_short": "St. Gall Energy Storage I", "owner": "St. Gall Energy Storage I", "state": "texas", "country": "usa", "lat": "33.322390103486484", "long": "-95.45465780673999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.322390103486484+-95.45465780673999", "construction_time_month": 5, "construction_speed_mwh_per_month": 40, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Golden Field Solar III, LLC", "city": "", "id": "1178", "external_id": "63859", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "294", "power_mw": "147", "customer": "", "owner": "Golden Field Solar III, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1178", "external_id": "63859", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Golden Field Solar III, LLC", "external_id": "63859", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 294, "power_mw": 147, "owner": "Golden Field Solar III, LLC", "status": "operation", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RCBA": {"first": {"year": "2024", "month": "4", "entity id": "63545", "entity name": "Golden Field Solar III, LLC", "plant producer type": "IPP", "plant name": "Golden Field Solar III, LLC", "plant state": "CA", "plant id": "63859", "generator id": "RCBA", "net summer capacity (mw)": "147", "technology": "Batteries", "energy source code": "", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63859", "date": "2024-04", "mw": 147}, "first_month": "2024-01", "changes": [{"month": "2024-02", "li": [{"name": "energy source code", "from": "", "to": "MWH", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-04", "to": "2024-03", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "3", "entity id": "63545", "entity name": "Golden Field Solar III, LLC", "plant producer type": "IPP", "plant name": "Golden Field Solar III, LLC", "plant state": "CA", "plant id": "63859", "generator id": "RCBA", "net summer capacity (mw)": "147", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63859", "date": "2024-03", "mw": 147}, "current_month": "2024-06", "dates": {"first_heard": "2024-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 147, "mwh_is_estimate": true, "mwh": 294, "mwh_estimate": 294, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "2024-03", "start_estimated": "2024-04", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Golden Field Solar III, LLC", "name_short": "Golden Field Solar III", "owner": "Golden Field Solar III, LLC", "state": "california", "country": "usa", "lat": "40.93693686027558", "long": "-121.04439962977752", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.93693686027558+-121.04439962977752", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ganado Solar", "city": "", "id": "1368", "external_id": "67284", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Enel Green Power NA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-03-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1368", "external_id": "67284", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ganado Solar", "external_id": "67284", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Enel Green Power NA, Inc.", "status": "operation", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GBA": {"first": {"year": "2024", "month": "3", "entity id": "59380", "entity name": "Enel Green Power NA, Inc.", "plant producer type": "IPP", "plant name": "Ganado Solar", "plant state": "TX", "plant id": "67284", "generator id": "GBA", "net summer capacity (mw)": "70.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67284", "date": "2024-03", "mw": 70}, "first_month": "2024-03", "changes": [{"month": "2024-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "3", "entity id": "59380", "entity name": "Enel Green Power NA, Inc.", "plant producer type": "IPP", "plant name": "Ganado Solar", "plant state": "TX", "plant id": "67284", "generator id": "GBA", "net summer capacity (mw)": "70.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "67284", "date": "2024-03", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "2024-03", "start_estimated": "", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Ganado Solar", "name_short": "Ganado Solar", "owner": "Enel Green Power NA, Inc.", "state": "texas", "country": "usa", "lat": "33.62803843467857", "long": "-95.51290703033499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.62803843467857+-95.51290703033499", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "EReserve 1-9 (9 different locations)", "city": "", "id": "13", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "315", "estimate_mwh": "", "power_mw": "180", "customer": "WCSB Power", "owner": "Enfinite", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "55.740245", "long": "-118.700003", "coords_hint": "1", "use_case": "", "notes": "eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ** the mwh number is from the twitter post", "project_website": "https://ereserve-project.com/", "link1": "http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "link2": "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "link3": "https://x.com/Tesla_Megapack/status/1781467958218469840", "link4": "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"}, "internal_id": "13", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 180, "mwh_is_estimate": false, "mwh": 315, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "month_disappeared": "", "go_live": "2024-02", "go_live_year_int": 2024, "name": "EReserve 1-9 (9 different locations)", "name_short": "EReserve 1-9 (9 different locations...", "owner": "Enfinite", "state": "alberta", "country": "canada", "lat": "55.740245", "long": "-118.700003", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.740245+-118.700003", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ", " the mwh number is from the twitter post"], "links": ["http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "https://x.com/Tesla_Megapack/status/1781467958218469840", "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Justin Court Energy Storage", "city": "", "id": "1046", "external_id": "66758", "state": "new jersey", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI 23 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1046", "external_id": "66758", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Justin Court Energy Storage", "external_id": "66758", "state": "new jersey", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "VESI 23 LLC", "status": "operation", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2024-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"JC1": {"first": {"year": "2023", "month": "7", "entity id": "65755", "entity name": "VESI 23 LLC", "plant producer type": "IPP", "plant name": "Justin Court Energy Storage", "plant state": "NJ", "plant id": "66758", "generator id": "JC1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66758", "date": "2023-07", "mw": 20}, "first_month": "2023-08", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2024-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "2", "entity id": "65755", "entity name": "VESI 23 LLC", "plant producer type": "IPP", "plant name": "Justin Court Energy Storage", "plant state": "NJ", "plant id": "66758", "generator id": "JC1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66758", "date": "2024-02", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2024-02", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2024-02", "go_live_year_int": 2024, "name": "Justin Court Energy Storage", "name_short": "Justin Court", "owner": "VESI 23 LLC", "state": "new jersey", "country": "usa", "lat": "40.11302298145458", "long": "-74.37304960280748", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.11302298145458+-74.37304960280748", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Goleta Energy Storage Project", "city": "Goleta", "id": "34", "external_id": "66394", "state": "california", "country": "usa", "capacity_mwh": "160", "estimate_mwh": "", "power_mw": "60", "customer": "Goleta Energy Storage, LLC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "62", "status": "operation", "date_first_heard": "2019-11-13", "start_construction": "", "start_operation": "2023-12-05", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.43274", "long": "-119.869283", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "the planning document on the website has a lot of detail", "project_website": "https://www.cityofgoleta.org/city-hall/planning-and-environmental-review/ceqa-review/cortona-battery-storage-project", "link1": "https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2", "link2": "", "link3": "", "link4": ""}, "internal_id": "34", "external_id": "66394", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Goleta Energy Storage, LLC", "external_id": "66394", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Goleta Energy Storage, LLC", "status": "operation", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GOLET": {"first": {"year": "2023", "month": "4", "entity id": "65479", "entity name": "Goleta Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Goleta Energy Storage, LLC", "plant state": "CA", "plant id": "66394", "generator id": "GOLET", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66394", "date": "2023-04", "mw": 60}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-04", "to": "2023-10", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "1", "entity id": "65479", "entity name": "Goleta Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Goleta Energy Storage, LLC", "plant state": "CA", "plant id": "66394", "generator id": "GOLET", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66394", "date": "2024-01", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": false, "mwh": 160, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Goleta Energy Storage, LLC", "name_short": "Goleta Energy Storage", "owner": "Goleta Energy Storage, LLC", "state": "california", "country": "usa", "lat": "34.43274", "long": "-119.869283", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.43274+-119.869283", "construction_time_month": 6, "construction_speed_mwh_per_month": 26, "no_of_battery_units": 62, "notes_split": ["the planning document on the website has a lot of detail"], "links": ["https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Richborough Energy Park", "city": "", "id": "450", "external_id": "8195", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Richborough Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "450", "external_id": "8195", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Richborough Energy Park", "external_id": "8195", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Richborough Energy Park Limited", "status": "operation", "date_first_heard": "2021-02-09", "start_construction": "2023-03-01", "start_operation": "2024-01-11", "start_estimated": "", "month_disappeared": "", "lat": "51.311959", "long": "1.343", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8195", "Record Last Updated (dd/mm/yyyy)": "24/02/2021", "Operator (or Applicant)": "Richborough Energy Park Limited", "Site Name": "Richborough Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Richborough Energy Park", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633075", "Y-coordinate": "162290", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/20/1467", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.311959", "long": "1.343", "status": "planning", "mw": 49, "ext_id": "8195"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2021", "to": "07/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "09/02/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/12/2021", "to": "19/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/03/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2023", "to": "11/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "8195", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Richborough Energy Park Limited", "Site Name": "Richborough Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Richborough Energy Park", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633075", "Y-coordinate": "162290", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/20/1467", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/02/2024", "Under Construction": "01/03/2023", "Operational": "", "Heat Network Ref": "", "lat": "51.311959", "long": "1.343", "status": "operation", "mw": 49, "ext_id": "8195"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-24", "start_construction": "2023-04-19", "start_operation": "2024-01-11"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02-09", "start_construction": "2023-03-01", "start_operation": "2024-01-11", "start_estimated": "", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Richborough Energy Park", "name_short": "Richborough Energy Park", "owner": "Richborough Energy Park Limited", "state": "south east", "country": "uk", "lat": "51.311959", "long": "1.343", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.311959+1.343", "construction_time_month": 10, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Richborough Energy Park - Phase 2", "city": "", "id": "516", "external_id": "9626", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "71", "power_mw": "71", "customer": "", "owner": "Richborough Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "516", "external_id": "9626", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Richborough Energy Park - Phase 2", "external_id": "9626", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Richborough Energy Park Limited", "status": "operation", "date_first_heard": "2021-04-30", "start_construction": "2023-01-01", "start_operation": "2024-01-11", "start_estimated": "", "month_disappeared": "", "lat": "51.311959", "long": "1.343", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9626", "Record Last Updated (dd/mm/yyyy)": "16/09/2021", "Operator (or Applicant)": "Richborough Energy Park Limited", "Site Name": "Richborough Energy Park - Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "71.60", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Richborough Energy Park", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633075", "Y-coordinate": "162290", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/21/0305", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.311959", "long": "1.343", "status": "planning", "mw": 71, "ext_id": "9626"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "30/04/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/09/2021", "to": "10/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2023", "to": "11/01/2024", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "71.6", "to": "50.1", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "mw", "from": 71, "to": 50, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9626", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Richborough Energy Park Limited", "Site Name": "Richborough Energy Park - Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.1", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Richborough Energy Park", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633075", "Y-coordinate": "162290", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/21/0305", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/04/2024", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "51.311959", "long": "1.343", "status": "operation", "mw": 50, "ext_id": "9626"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-16", "start_construction": "2023-01-10", "start_operation": "2024-01-11"}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04-30", "start_construction": "2023-01-01", "start_operation": "2024-01-11", "start_estimated": "", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Richborough Energy Park - Phase 2", "name_short": "Richborough Energy Park - Phase 2", "owner": "Richborough Energy Park Limited", "state": "south east", "country": "uk", "lat": "51.311959", "long": "1.343", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.311959+1.343", "construction_time_month": 12, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mesquite Solar 4, LLC", "city": "", "id": "773", "external_id": "65962", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "773", "external_id": "65962", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mesquite Solar 4, LLC", "external_id": "65962", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Consolidated Edison Development Inc.", "status": "operation", "date_first_heard": "2022-10", "start_construction": "2022-11", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MS4B": {"first": {"year": "2023", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Mesquite Solar 4, LLC", "plant state": "AZ", "plant id": "65962", "generator id": "MS4B", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65962", "date": "2023-06", "mw": 10}, "first_month": "2022-10", "changes": [{"month": "2022-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-01", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "1", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Mesquite Solar 4, LLC", "plant state": "AZ", "plant id": "65962", "generator id": "MS4B", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65962", "date": "2024-01", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2022-10", "start_construction": "2022-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-10", "start_construction": "2022-11", "start_operation": "2024-01", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Mesquite Solar 4, LLC", "name_short": "Mesquite Solar 4", "owner": "Consolidated Edison Development Inc.", "state": "arizona", "country": "usa", "lat": "36.31177149915876", "long": "-110.00633776197225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.31177149915876+-110.00633776197225", "construction_time_month": 14, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "House Mountain", "city": "", "id": "859", "external_id": "66006", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "63", "customer": "", "owner": "House Mountain", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "859", "external_id": "66006", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "House Mountain", "external_id": "66006", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 126, "power_mw": 63, "owner": "House Mountain", "status": "operation", "date_first_heard": "2022-11", "start_construction": "2023-02", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2023", "month": "4", "entity id": "65181", "entity name": "House Mountain", "plant producer type": "IPP", "plant name": "House Mountain", "plant state": "TX", "plant id": "66006", "generator id": "BA", "net summer capacity (mw)": "63", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66006", "date": "2023-04", "mw": 63}, "first_month": "2022-11", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-05", "to": "2023-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-07", "to": "2023-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "1", "entity id": "65181", "entity name": "House Mountain", "plant producer type": "IPP", "plant name": "House Mountain", "plant state": "TX", "plant id": "66006", "generator id": "BA", "net summer capacity (mw)": "63", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66006", "date": "2024-01", "mw": 63}, "current_month": "2024-06", "dates": {"first_heard": "2022-11", "start_construction": "2023-02"}, "month_disappeared": ""}}, "mw": 63, "mwh_is_estimate": true, "mwh": 126, "mwh_estimate": 126, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "2023-02", "start_operation": "2024-01", "start_estimated": "2023-04", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "House Mountain", "name_short": "House Mountain", "owner": "House Mountain", "state": "texas", "country": "usa", "lat": "33.361966935676264", "long": "-94.99002315814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.361966935676264+-94.99002315814404", "construction_time_month": 11, "construction_speed_mwh_per_month": 11, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kapolei Energy Storage", "city": "", "id": "1", "external_id": "66067", "state": "hawaii", "country": "usa", "capacity_mwh": "565", "estimate_mwh": "", "power_mw": "185", "customer": "Hawaiian Electric", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "158", "status": "operation", "date_first_heard": "", "start_construction": "2021-08-25", "start_operation": "2024-01-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.328169", "long": "-158.105085", "coords_hint": "1", "use_case": "island, black start", "notes": "", "project_website": "https://www.kapoleienergystorage.com/overview", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "link2": "https://twitter.com/Tesla_Megapack/status/1745499330612748482", "link3": "", "link4": ""}, "internal_id": "1", "external_id": "66067", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kapolei Energy Storage", "external_id": "66067", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "Kapolei Energy Storage I, LLC", "status": "operation", "date_first_heard": "2023-01", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KES1": {"first": {"year": "2023", "month": "5", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Kapolei Energy Storage", "plant state": "HI", "plant id": "66067", "generator id": "KES1", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66067", "date": "2023-05", "mw": 185}, "first_month": "2023-01", "changes": [{"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Kapolei Energy Storage", "plant state": "HI", "plant id": "66067", "generator id": "KES1", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66067", "date": "2023-12", "mw": 185}, "current_month": "2024-02", "dates": {"first_heard": "2023-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": false, "mwh": 565, "mwh_estimate": 370, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-01", "start_construction": "2021-08-25", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Kapolei Energy Storage", "name_short": "Kapolei", "owner": "Kapolei Energy Storage I, LLC", "state": "hawaii", "country": "usa", "lat": "21.328169", "long": "-158.105085", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:21.328169+-158.105085", "construction_time_month": 28, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 158, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "https://twitter.com/Tesla_Megapack/status/1745499330612748482"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Daggett 2", "city": "", "id": "167", "external_id": "64851", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "262", "power_mw": "131", "customer": "", "owner": "Daggett Solar Power 2 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "167", "external_id": "64851", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Daggett 2", "external_id": "64851", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 262, "power_mw": 131, "owner": "Daggett Solar Power 2 LLC", "status": "operation", "date_first_heard": "2021-09", "start_construction": "2023-01", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DAGGB": {"first": {"year": "2023", "month": "6", "entity id": "64364", "entity name": "Daggett Solar Power 2 LLC", "plant producer type": "IPP", "plant name": "Daggett 2", "plant state": "CA", "plant id": "64851", "generator id": "DAGGB", "net summer capacity (mw)": "131", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64851", "date": "2023-06", "mw": 131}, "first_month": "2021-09", "changes": [{"month": "2022-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-11", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-11", "to": "2023-09", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "64364", "entity name": "Daggett Solar Power 2 LLC", "plant producer type": "IPP", "plant name": "Daggett 2", "plant state": "CA", "plant id": "64851", "generator id": "DAGGB", "net summer capacity (mw)": "131", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64851", "date": "2023-12", "mw": 131}, "current_month": "2024-02", "dates": {"first_heard": "2021-09", "start_construction": "2023-01"}, "month_disappeared": ""}}, "mw": 131, "mwh_is_estimate": true, "mwh": 262, "mwh_estimate": 262, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "2023-01", "start_operation": "2023-12", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Daggett 2", "name_short": "Daggett 2", "owner": "Daggett Solar Power 2 LLC", "state": "california", "country": "usa", "lat": "41.34434765645874", "long": "-121.46110215912815", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.34434765645874+-121.46110215912815", "construction_time_month": 11, "construction_speed_mwh_per_month": 23, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arrow Canyon Solar Hybrid", "city": "", "id": "229", "external_id": "62248", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Arrow Canyon Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "229", "external_id": "62248", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arrow Canyon Solar Hybrid", "external_id": "62248", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Arrow Canyon Solar LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-12", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"2": {"first": {"year": "2022", "month": "12", "entity id": "61768", "entity name": "Arrow Canyon Solar LLC", "plant producer type": "IPP", "plant name": "Arrow Canyon Solar Hybrid", "plant state": "NV", "plant id": "62248", "generator id": "2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62248", "date": "2022-12", "mw": 75}, "first_month": "2020-09", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2022-12", "to": "2023-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "61768", "entity name": "Arrow Canyon Solar LLC", "plant producer type": "IPP", "plant name": "Arrow Canyon Solar Hybrid", "plant state": "NV", "plant id": "62248", "generator id": "2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62248", "date": "2023-12", "mw": 75}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-12"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-12", "start_operation": "2023-12", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Arrow Canyon Solar Hybrid", "name_short": "Arrow Canyon Solar", "owner": "Arrow Canyon Solar LLC", "state": "nevada", "country": "usa", "lat": "41.616942044661236", "long": "-115.13235745087825", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.616942044661236+-115.13235745087825", "construction_time_month": 12, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Revolution", "city": "", "id": "939", "external_id": "66170", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Crane 2 BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "939", "external_id": "66170", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Revolution", "external_id": "66170", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Crane 2 BESS, LLC", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "10", "entity id": "65313", "entity name": "Crane 2 BESS, LLC", "plant producer type": "IPP", "plant name": "Revolution", "plant state": "TX", "plant id": "66170", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66170", "date": "2023-10", "mw": 150}, "first_month": "2023-02", "changes": [{"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65313", "entity name": "Crane 2 BESS, LLC", "plant producer type": "IPP", "plant name": "Revolution", "plant state": "TX", "plant id": "66170", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66170", "date": "2023-12", "mw": 150}, "current_month": "2024-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2023-12", "start_estimated": "2023-10", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Revolution", "name_short": "Revolution", "owner": "Crane 2 BESS, LLC", "state": "texas", "country": "usa", "lat": "33.374327615451264", "long": "-95.02806541879585", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.374327615451264+-95.02806541879585", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Solar Blue", "city": "", "id": "949", "external_id": "63848", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "450", "power_mw": "225", "customer": "", "owner": "Westlands Solar Blue (OZ) Owner, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "949", "external_id": "63848", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Solar Blue", "external_id": "63848", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 450, "power_mw": 225, "owner": "Westlands Solar Blue (OZ) Owner, LLC", "status": "operation", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2023", "month": "9", "entity id": "63525", "entity name": "Westlands Solar Blue (OZ) Owner, LLC", "plant producer type": "IPP", "plant name": "Solar Blue", "plant state": "CA", "plant id": "63848", "generator id": "BESS1", "net summer capacity (mw)": "225", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63848", "date": "2023-09", "mw": 225}, "first_month": "2023-03", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "63525", "entity name": "Westlands Solar Blue (OZ) Owner, LLC", "plant producer type": "IPP", "plant name": "Solar Blue", "plant state": "CA", "plant id": "63848", "generator id": "BESS1", "net summer capacity (mw)": "225", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63848", "date": "2023-12", "mw": 225}, "current_month": "2024-02", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 225, "mwh_is_estimate": true, "mwh": 450, "mwh_estimate": 450, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-12", "start_estimated": "2023-09", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Solar Blue", "name_short": "Solar Blue", "owner": "Westlands Solar Blue (OZ) Owner, LLC", "state": "california", "country": "usa", "lat": "41.20858372443624", "long": "-121.56444271153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.20858372443624+-121.56444271153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chestnut", "city": "", "id": "953", "external_id": "63849", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "Chestnut Westside, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "953", "external_id": "63849", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Chestnut", "external_id": "63849", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 270, "power_mw": 135, "owner": "Chestnut Westside, LLC", "status": "operation", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2023", "month": "9", "entity id": "63526", "entity name": "Chestnut Westside, LLC", "plant producer type": "IPP", "plant name": "Chestnut", "plant state": "CA", "plant id": "63849", "generator id": "BESS1", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63849", "date": "2023-09", "mw": 135}, "first_month": "2023-03", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "63526", "entity name": "Chestnut Westside, LLC", "plant producer type": "IPP", "plant name": "Chestnut", "plant state": "CA", "plant id": "63849", "generator id": "BESS1", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63849", "date": "2023-12", "mw": 135}, "current_month": "2024-02", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 135, "mwh_is_estimate": true, "mwh": 270, "mwh_estimate": 270, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-12", "start_estimated": "2023-09", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Chestnut", "name_short": "Chestnut", "owner": "Chestnut Westside, LLC", "state": "california", "country": "usa", "lat": "40.98838017893376", "long": "-121.39762135188055", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98838017893376+-121.39762135188055", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McFarland A Solar and Storage", "city": "", "id": "1009", "external_id": "66636", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1009", "external_id": "66636", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McFarland A Solar and Storage", "external_id": "66636", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "AES Clean Energy", "status": "operation", "date_first_heard": "2023-06", "start_construction": "2023-09", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland A Solar and Storage", "plant state": "AZ", "plant id": "66636", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66636", "date": "2023-12", "mw": 100}, "first_month": "2023-06", "changes": [{"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2023-11", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland A Solar and Storage", "plant state": "AZ", "plant id": "66636", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66636", "date": "2023-12", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2023-06", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-06", "start_construction": "2023-09", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "McFarland A Solar and Storage", "name_short": "McFarland A Solar", "owner": "AES Clean Energy", "state": "arizona", "country": "usa", "lat": "36.53961436488624", "long": "-110.07356319022644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.53961436488624+-110.07356319022644", "construction_time_month": 3, "construction_speed_mwh_per_month": 66, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SR McNeal", "city": "", "id": "1035", "external_id": "66925", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "SR McNeal, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1035", "external_id": "66925", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SR McNeal", "external_id": "66925", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "SR McNeal, LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MCBA": {"first": {"year": "2023", "month": "12", "entity id": "65303", "entity name": "SR McNeal, LLC", "plant producer type": "IPP", "plant name": "SR McNeal", "plant state": "AZ", "plant id": "66925", "generator id": "MCBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66925", "date": "2023-12", "mw": 20}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65303", "entity name": "SR McNeal, LLC", "plant producer type": "IPP", "plant name": "SR McNeal", "plant state": "AZ", "plant id": "66925", "generator id": "MCBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66925", "date": "2023-12", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SR McNeal", "name_short": "SR McNeal", "owner": "SR McNeal, LLC", "state": "arizona", "country": "usa", "lat": "36.308429", "long": "-109.885254", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.308429+-109.885254", "construction_time_month": 1, "construction_speed_mwh_per_month": 40, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Estrella Solar & Storage", "city": "", "id": "1039", "external_id": "66772", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "56", "power_mw": "28", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1039", "external_id": "66772", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Estrella Solar & Storage", "external_id": "66772", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 56, "power_mw": 28, "owner": "AES Clean Energy", "status": "operation", "date_first_heard": "2023-08", "start_construction": "2023-10", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ESTRB": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Estrella Solar & Storage", "plant state": "CA", "plant id": "66772", "generator id": "ESTRB", "net summer capacity (mw)": "28", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66772", "date": "2023-12", "mw": 28}, "first_month": "2023-08", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Estrella Solar & Storage", "plant state": "CA", "plant id": "66772", "generator id": "ESTRB", "net summer capacity (mw)": "28", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66772", "date": "2023-12", "mw": 28}, "current_month": "2024-02", "dates": {"first_heard": "2023-08", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 28, "mwh_is_estimate": true, "mwh": 56, "mwh_estimate": 56, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-08", "start_construction": "2023-10", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Estrella Solar & Storage", "name_short": "Estrella Solar &", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "41.04295061545127", "long": "-121.05467641879585", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.04295061545127+-121.05467641879585", "construction_time_month": 2, "construction_speed_mwh_per_month": 28, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Reid Gardner", "city": "", "id": "1048", "external_id": "2324", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "440", "power_mw": "220", "customer": "", "owner": "Nevada Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1048", "external_id": "2324", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Reid Gardner", "external_id": "2324", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 440, "power_mw": 220, "owner": "Nevada Power Co", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RGES1": {"first": {"year": "2023", "month": "12", "entity id": "13407", "entity name": "Nevada Power Co", "plant producer type": "Electric Utility", "plant name": "Reid Gardner", "plant state": "NV", "plant id": "2324", "generator id": "RGES1", "net summer capacity (mw)": "220", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "2324", "date": "2023-12", "mw": 220}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "13407", "entity name": "Nevada Power Co", "plant producer type": "Electric Utility", "plant name": "Reid Gardner", "plant state": "NV", "plant id": "2324", "generator id": "RGES1", "net summer capacity (mw)": "220", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "2324", "date": "2023-12", "mw": 220}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 220, "mwh_is_estimate": true, "mwh": 440, "mwh_estimate": 440, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Reid Gardner", "name_short": "Reid Gardner", "owner": "Nevada Power Co", "state": "nevada", "country": "usa", "lat": "41.693869024586874", "long": "-115.11311435056", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.693869024586874+-115.11311435056", "construction_time_month": 1, "construction_speed_mwh_per_month": 440, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Alamo LLC", "city": "", "id": "1067", "external_id": "66929", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Alamo LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1067", "external_id": "66929", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Alamo LLC", "external_id": "66929", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Alamo LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTAL": {"first": {"year": "2023", "month": "11", "entity id": "65843", "entity name": "SMT Alamo LLC", "plant producer type": "IPP", "plant name": "SMT Alamo LLC", "plant state": "TX", "plant id": "66929", "generator id": "SMTAL", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66929", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65843", "entity name": "SMT Alamo LLC", "plant producer type": "IPP", "plant name": "SMT Alamo LLC", "plant state": "TX", "plant id": "66929", "generator id": "SMTAL", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66929", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Alamo LLC", "name_short": "SMT Alamo", "owner": "SMT Alamo LLC", "state": "texas", "country": "usa", "lat": "33.67572465645873", "long": "-95.43449115912814", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.67572465645873+-95.43449115912814", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Harlingen II LLC", "city": "", "id": "1068", "external_id": "66933", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Harlingen II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1068", "external_id": "66933", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Harlingen II LLC", "external_id": "66933", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Harlingen II LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTH2": {"first": {"year": "2023", "month": "11", "entity id": "65847", "entity name": "SMT Harlingen II LLC", "plant producer type": "IPP", "plant name": "SMT Harlingen II LLC", "plant state": "TX", "plant id": "66933", "generator id": "SMTH2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66933", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65847", "entity name": "SMT Harlingen II LLC", "plant producer type": "IPP", "plant name": "SMT Harlingen II LLC", "plant state": "TX", "plant id": "66933", "generator id": "SMTH2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66933", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Harlingen II LLC", "name_short": "SMT Harlingen II", "owner": "SMT Harlingen II LLC", "state": "texas", "country": "usa", "lat": "33.62803843467857", "long": "-95.51290703033499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.62803843467857+-95.51290703033499", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Mercedes LLC", "city": "", "id": "1069", "external_id": "66926", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Mercedes LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1069", "external_id": "66926", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Mercedes LLC", "external_id": "66926", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Mercedes LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTNM": {"first": {"year": "2023", "month": "11", "entity id": "65838", "entity name": "SMT Mercedes LLC", "plant producer type": "IPP", "plant name": "SMT Mercedes LLC", "plant state": "TX", "plant id": "66926", "generator id": "SMTNM", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66926", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65838", "entity name": "SMT Mercedes LLC", "plant producer type": "IPP", "plant name": "SMT Mercedes LLC", "plant state": "TX", "plant id": "66926", "generator id": "SMTNM", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66926", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Mercedes LLC", "name_short": "SMT Mercedes", "owner": "SMT Mercedes LLC", "state": "texas", "country": "usa", "lat": "33.552321404211234", "long": "-95.57587397218185", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.552321404211234+-95.57587397218185", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Mission LLC", "city": "", "id": "1070", "external_id": "66927", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Mission LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1070", "external_id": "66927", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Mission LLC", "external_id": "66927", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Mission LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTMB": {"first": {"year": "2023", "month": "11", "entity id": "65839", "entity name": "SMT Mission LLC", "plant producer type": "IPP", "plant name": "SMT Mission LLC", "plant state": "TX", "plant id": "66927", "generator id": "SMTMB", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66927", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65839", "entity name": "SMT Mission LLC", "plant producer type": "IPP", "plant name": "SMT Mission LLC", "plant state": "TX", "plant id": "66927", "generator id": "SMTMB", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66927", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Mission LLC", "name_short": "SMT Mission", "owner": "SMT Mission LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.413438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.413438", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Santa Rosa LLC", "city": "", "id": "1071", "external_id": "66928", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Santa Rosa LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1071", "external_id": "66928", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Santa Rosa LLC", "external_id": "66928", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Santa Rosa LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTSR": {"first": {"year": "2023", "month": "11", "entity id": "65844", "entity name": "SMT Santa Rosa LLC", "plant producer type": "IPP", "plant name": "SMT Santa Rosa LLC", "plant state": "TX", "plant id": "66928", "generator id": "SMTSR", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66928", "date": "2023-11", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65844", "entity name": "SMT Santa Rosa LLC", "plant producer type": "IPP", "plant name": "SMT Santa Rosa LLC", "plant state": "TX", "plant id": "66928", "generator id": "SMTSR", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66928", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-11", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Santa Rosa LLC", "name_short": "SMT Santa Rosa", "owner": "SMT Santa Rosa LLC", "state": "texas", "country": "usa", "lat": "33.403993246911256", "long": "-95.42750915563981", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.403993246911256+-95.42750915563981", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Elsa LLC", "city": "", "id": "1072", "external_id": "66931", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Elsa LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1072", "external_id": "66931", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Elsa LLC", "external_id": "66931", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Elsa LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTEL": {"first": {"year": "2023", "month": "12", "entity id": "65841", "entity name": "SMT Elsa LLC", "plant producer type": "IPP", "plant name": "SMT Elsa LLC", "plant state": "TX", "plant id": "66931", "generator id": "SMTEL", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66931", "date": "2023-12", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65841", "entity name": "SMT Elsa LLC", "plant producer type": "IPP", "plant name": "SMT Elsa LLC", "plant state": "TX", "plant id": "66931", "generator id": "SMTEL", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66931", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Elsa LLC", "name_short": "SMT Elsa", "owner": "SMT Elsa LLC", "state": "texas", "country": "usa", "lat": "33.345901513578184", "long": "-95.42229712696499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.345901513578184+-95.42229712696499", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Los Fresnos LLC", "city": "", "id": "1073", "external_id": "66932", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Los Fresnos LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1073", "external_id": "66932", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Los Fresnos LLC", "external_id": "66932", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Los Fresnos LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTLF": {"first": {"year": "2023", "month": "12", "entity id": "65840", "entity name": "SMT Los Fresnos LLC", "plant producer type": "IPP", "plant name": "SMT Los Fresnos LLC", "plant state": "TX", "plant id": "66932", "generator id": "SMTLF", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66932", "date": "2023-12", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65840", "entity name": "SMT Los Fresnos LLC", "plant producer type": "IPP", "plant name": "SMT Los Fresnos LLC", "plant state": "TX", "plant id": "66932", "generator id": "SMTLF", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66932", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Los Fresnos LLC", "name_short": "SMT Los Fresnos", "owner": "SMT Los Fresnos LLC", "state": "texas", "country": "usa", "lat": "33.28739649915876", "long": "-95.39452176197224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.28739649915876+-95.39452176197224", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Rio Grande I LLC", "city": "", "id": "1074", "external_id": "66934", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Rio Grande I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1074", "external_id": "66934", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Rio Grande I LLC", "external_id": "66934", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Rio Grande I LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTR1": {"first": {"year": "2023", "month": "12", "entity id": "65845", "entity name": "SMT Rio Grande I LLC", "plant producer type": "IPP", "plant name": "SMT Rio Grande I LLC", "plant state": "TX", "plant id": "66934", "generator id": "SMTR1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66934", "date": "2023-12", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65845", "entity name": "SMT Rio Grande I LLC", "plant producer type": "IPP", "plant name": "SMT Rio Grande I LLC", "plant state": "TX", "plant id": "66934", "generator id": "SMTR1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66934", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Rio Grande I LLC", "name_short": "SMT Rio Grande I", "owner": "SMT Rio Grande I LLC", "state": "texas", "country": "usa", "lat": "33.23721311428471", "long": "-95.34389387471748", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.23721311428471+-95.34389387471748", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Rio Grande II LLC", "city": "", "id": "1075", "external_id": "66935", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Rio Grande II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1075", "external_id": "66935", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Rio Grande II LLC", "external_id": "66935", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Rio Grande II LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTR2": {"first": {"year": "2023", "month": "12", "entity id": "65846", "entity name": "SMT Rio Grande II LLC", "plant producer type": "IPP", "plant name": "SMT Rio Grande II LLC", "plant state": "TX", "plant id": "66935", "generator id": "SMTR2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66935", "date": "2023-12", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65846", "entity name": "SMT Rio Grande II LLC", "plant producer type": "IPP", "plant name": "SMT Rio Grande II LLC", "plant state": "TX", "plant id": "66935", "generator id": "SMTR2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66935", "date": "2023-12", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-12", "start_estimated": "2023-12", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "SMT Rio Grande II LLC", "name_short": "SMT Rio Grande II", "owner": "SMT Rio Grande II LLC", "state": "texas", "country": "usa", "lat": "33.204054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.204054+-95.273438", "construction_time_month": 1, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bouldercombe", "city": "", "id": "119", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Genex Power", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "40", "status": "operation", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-23.537188", "long": "150.48991", "coords_hint": "3", "use_case": "", "notes": "used the date of the tweet as operation start date", "project_website": "https://www.genexpower.com.au/bouldercombe-battery-project.html", "link1": "https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "link2": "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "link3": "https://twitter.com/SawyerMerritt/status/1722857295078383700", "link4": ""}, "internal_id": "119", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Bouldercombe", "name_short": "Bouldercombe", "owner": "Genex Power", "state": "queensland", "country": "australia", "lat": "-23.537188", "long": "150.48991", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-23.537188+150.48991", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 40, "notes_split": ["used the date of the tweet as operation start date"], "links": ["https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "https://twitter.com/SawyerMerritt/status/1722857295078383700"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "West Didsbury Battery Storage", "city": "", "id": "363", "external_id": "7185", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "363", "external_id": "7185", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Didsbury Battery Storage", "external_id": "7185", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy / Gresham House", "status": "operation", "date_first_heard": "2017-12-20", "start_construction": "2022-06-01", "start_operation": "2023-11-21", "start_estimated": "", "month_disappeared": "", "lat": "53.418818", "long": "-2.280893", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7185", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy", "Site Name": "West Didsbury Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sawfield Nurseries Fairy Lane, Sale", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M33 2JU", "X-coordinate": "381429", "Y-coordinate": "391372", "Planning Authority": "Trafford Council", "Planning Application Reference": "92459/FUL/17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.418818", "long": "-2.280893", "status": "planning", "mw": 50, "ext_id": "7185"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "23/08/2022", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "50", "to": "49.99", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 50, "to": 49, "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/08/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "24/11/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Statera Energy", "to": "Statera Energy / Gresham House", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "21/11/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7185", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Statera Energy / Gresham House", "Site Name": "West Didsbury Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sawfield Nurseries Fairy Lane, Sale", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M33 2JU", "X-coordinate": "381429", "Y-coordinate": "391372", "Planning Authority": "Trafford Council", "Planning Application Reference": "92459/FUL/17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2020", "Under Construction": "01/06/2022", "Operational": "21/11/2023", "Heat Network Ref": "", "lat": "53.418818", "long": "-2.280893", "status": "operation", "mw": 49, "ext_id": "7185"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "2022-08-23", "start_operation": "2023-11-24"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-12-20", "start_construction": "2022-06-01", "start_operation": "2023-11-21", "start_estimated": "", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "West Didsbury Battery Storage", "name_short": "West Didsbury", "owner": "Statera Energy / Gresham House", "state": "north west", "country": "uk", "lat": "53.418818", "long": "-2.280893", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.418818+-2.280893", "construction_time_month": 17, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dry Bridge Storage", "city": "", "id": "565", "external_id": "65044", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Dominion Energy Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "565", "external_id": "65044", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dry Bridge Storage", "external_id": "65044", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Dominion Energy Inc.", "status": "operation", "date_first_heard": "2021-11", "start_construction": "2022-10", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DBES": {"first": {"year": "2022", "month": "12", "entity id": "5248", "entity name": "Dominion Energy Inc", "plant producer type": "Electric Utility", "plant name": "Dry Bridge Storage", "plant state": "VA", "plant id": "65044", "generator id": "DBES", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65044", "date": "2022-12", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-02", "li": [{"name": "date", "from": "2022-12", "to": "2022-10", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "entity name", "from": "Dominion Energy Inc", "to": "Dominion Energy Inc.", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-04", "to": "2023-09", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2023-11", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "11", "entity id": "5248", "entity name": "Dominion Energy Inc.", "plant producer type": "Electric Utility", "plant name": "Dry Bridge Storage", "plant state": "VA", "plant id": "65044", "generator id": "DBES", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65044", "date": "2023-11", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2021-11", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "2022-10", "start_operation": "2023-11", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Dry Bridge Storage", "name_short": "Dry Bridge", "owner": "Dominion Energy Inc.", "state": "virginia", "country": "usa", "lat": "38.390223", "long": "-77.80875", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.390223+-77.80875", "construction_time_month": 13, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E1B", "city": "", "id": "698", "external_id": "65674", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "280", "power_mw": "140", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "698", "external_id": "65674", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E1B", "external_id": "65674", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 272, "power_mw": 136, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "8", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E1B", "plant state": "CA", "plant id": "65674", "generator id": "BESS", "net summer capacity (mw)": "140.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65674", "date": "2023-08", "mw": 140}, "first_month": "2022-06", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 140, "to": 136, "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E1B", "plant state": "CA", "plant id": "65674", "generator id": "BESS", "net summer capacity (mw)": "136", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65674", "date": "2023-11", "mw": 136}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 136, "mwh_is_estimate": true, "mwh": 272, "mwh_estimate": 272, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Edwards Sanborn E1B", "name_short": "Edwards Sanborn E1B", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "40.91342545018388", "long": "-121.01203895000252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.91342545018388+-121.01203895000252", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E4", "city": "", "id": "703", "external_id": "65675", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "218", "power_mw": "109", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "703", "external_id": "65675", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E4", "external_id": "65675", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "2", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E4", "plant state": "CA", "plant id": "65675", "generator id": "BESS", "net summer capacity (mw)": "109.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65675", "date": "2023-02", "mw": 109}, "first_month": "2022-06", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-04", "to": "2023-07", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-07", "to": "2023-04", "extra": "accelerated by 3 months", "change_type": "timing"}, {"name": "mw", "from": 109, "to": 100, "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E4", "plant state": "CA", "plant id": "65675", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65675", "date": "2023-11", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "2023-02", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Edwards Sanborn E4", "name_short": "Edwards Sanborn E4", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.17607212162875", "long": "-121.2612551733487", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17607212162875+-121.2612551733487", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E5", "city": "", "id": "706", "external_id": "65676", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "706", "external_id": "65676", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E5", "external_id": "65676", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 94, "power_mw": 47, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E5", "plant state": "CA", "plant id": "65676", "generator id": "BESS", "net summer capacity (mw)": "75.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65676", "date": "2022-12", "mw": 75}, "first_month": "2022-06", "changes": [{"month": "2022-08", "li": [{"name": "date", "from": "2022-12", "to": "2023-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 75, "to": 47, "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E5", "plant state": "CA", "plant id": "65676", "generator id": "BESS", "net summer capacity (mw)": "47", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65676", "date": "2023-11", "mw": 47}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 47, "mwh_is_estimate": true, "mwh": 94, "mwh_estimate": 94, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Edwards Sanborn E5", "name_short": "Edwards Sanborn E5", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.248216460150964", "long": "-121.34083924325749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.248216460150964+-121.34083924325749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sanborn EBESS1", "city": "", "id": "708", "external_id": "65673", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "114", "power_mw": "57", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "708", "external_id": "65673", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sanborn BESS 4", "external_id": "65673", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 94, "power_mw": 47, "owner": "Terra-Gen Operating Co-BESS", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "1", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn EBESS1", "plant state": "CA", "plant id": "65673", "generator id": "BESS", "net summer capacity (mw)": "57.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65673", "date": "2023-01", "mw": 57}, "first_month": "2022-06", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-01", "to": "2023-06", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 57, "to": 47, "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-08", "to": "2023-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "plant name", "from": "Sanborn EBESS1", "to": "Sanborn BESS 4", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2023-11", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "11", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 4", "plant state": "CA", "plant id": "65673", "generator id": "BESS", "net summer capacity (mw)": "47", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65673", "date": "2023-11", "mw": 47}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 47, "mwh_is_estimate": true, "mwh": 94, "mwh_estimate": 94, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-11", "start_estimated": "2023-01", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Sanborn BESS 4", "name_short": "Sanborn BESS 4", "owner": "Terra-Gen Operating Co-BESS", "state": "california", "country": "usa", "lat": "41.226127204403475", "long": "-121.44243599100999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.226127204403475+-121.44243599100999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stanton Battery Energy Storage", "city": "", "id": "958", "external_id": "66423", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "136", "power_mw": "68", "customer": "", "owner": "Wellhead Services, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "958", "external_id": "66423", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Stanton Battery Energy Storage", "external_id": "66423", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 136, "power_mw": 68, "owner": "Wellhead Services, Inc", "status": "operation", "date_first_heard": "2023-04", "start_construction": "2023-06", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2023", "month": "8", "entity id": "20323", "entity name": "Wellhead Services, Inc", "plant producer type": "IPP", "plant name": "Stanton Battery Energy Storage", "plant state": "CA", "plant id": "66423", "generator id": "BESS1", "net summer capacity (mw)": "68.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66423", "date": "2023-08", "mw": 68}, "first_month": "2023-04", "changes": [{"month": "2023-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "20323", "entity name": "Wellhead Services, Inc", "plant producer type": "IPP", "plant name": "Stanton Battery Energy Storage", "plant state": "CA", "plant id": "66423", "generator id": "BESS1", "net summer capacity (mw)": "68.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66423", "date": "2023-11", "mw": 68}, "current_month": "2024-02", "dates": {"first_heard": "2023-04", "start_construction": "2023-06"}, "month_disappeared": ""}}, "mw": 68, "mwh_is_estimate": true, "mwh": 136, "mwh_estimate": 136, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-04", "start_construction": "2023-06", "start_operation": "2023-11", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Stanton Battery Energy Storage", "name_short": "Stanton", "owner": "Wellhead Services, Inc", "state": "california", "country": "usa", "lat": "40.96044827036728", "long": "-121.07676030955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.96044827036728+-121.07676030955251", "construction_time_month": 5, "construction_speed_mwh_per_month": 27, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMT Bay City LLC", "city": "", "id": "1066", "external_id": "66930", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Bay City LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1066", "external_id": "66930", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SMT Bay City LLC", "external_id": "66930", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "SMT Bay City LLC", "status": "operation", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SMTBC": {"first": {"year": "2023", "month": "10", "entity id": "65842", "entity name": "SMT Bay City LLC", "plant producer type": "IPP", "plant name": "SMT Bay City LLC", "plant state": "TX", "plant id": "66930", "generator id": "SMTBC", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66930", "date": "2023-10", "mw": 10}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "11", "entity id": "65842", "entity name": "SMT Bay City LLC", "plant producer type": "IPP", "plant name": "SMT Bay City LLC", "plant state": "TX", "plant id": "66930", "generator id": "SMTBC", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66930", "date": "2023-11", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-09", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-09", "start_construction": "2023-11", "start_operation": "2023-11", "start_estimated": "2023-10", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "SMT Bay City LLC", "name_short": "SMT Bay City", "owner": "SMT Bay City LLC", "state": "texas", "country": "usa", "lat": "33.69372024210638", "long": "-95.35131028258249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.69372024210638+-95.35131028258249", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Riverina 1 + 2 / Darlington Point Energy Storage", "city": "Darlington Point", "id": "45", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "Edify Energy / Shell", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.646927", "long": "146.03516", "coords_hint": "1", "use_case": "333MW solar farm support", "notes": "it says on the project website that the 3 projects are colocated, so combined them here into just one entry", "project_website": "https://edifyenergy.com/project/riverina-darlington-point/", "link1": "https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "link2": "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "link3": "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "link4": "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"}, "internal_id": "45", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Riverina 1 + 2 / Darlington Point Energy Storage", "name_short": "Riverina 1 + 2 / Darlington Point", "owner": "", "state": "new south wales", "country": "australia", "lat": "-34.646927", "long": "146.03516", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.646927+146.03516", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["it says on the project website that the 3 projects are colocated, so combined them here into just one entry"], "links": ["https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bustleholme Substation", "city": "", "id": "426", "external_id": "7907", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "426", "external_id": "7907", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bustleholme Substation", "external_id": "7907", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "operation", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "2023-10-20", "start_estimated": "", "month_disappeared": "", "lat": "52.553231", "long": "-1.957038", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7907", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Pivot Power", "Site Name": "Bustleholme Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Western Power Distribution Bus, Woodruff Way, Walsall, West Midlands", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS5 4RA", "X-coordinate": "403010", "Y-coordinate": "295044", "Planning Authority": "Sandwell Metropolitan Borough Council", "Planning Application Reference": "DC/20/64437", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.553231", "long": "-1.957038", "status": "planning", "mw": 49, "ext_id": "7907"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "20/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7907", "Record Last Updated (dd/mm/yyyy)": "20/10/2023", "Operator (or Applicant)": "Pivot Power", "Site Name": "Bustleholme Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Western Power Distribution Bus, Woodruff Way, Walsall, West Midlands", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS5 4RA", "X-coordinate": "403010", "Y-coordinate": "295044", "Planning Authority": "Sandwell Metropolitan Borough Council", "Planning Application Reference": "DC/20/64437", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.553231", "long": "-1.957038", "status": "operation", "mw": 49, "ext_id": "7907"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": "2023-10-20"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "2023-10-20", "start_estimated": "", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Bustleholme Substation", "name_short": "Bustleholme Substation", "owner": "Pivot Power", "state": "west midlands", "country": "uk", "lat": "52.553231", "long": "-1.957038", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.553231+-1.957038", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sanborn BESS 3", "city": "", "id": "695", "external_id": "65672", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "175", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "695", "external_id": "65672", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sanborn BESS 3", "external_id": "65672", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 338, "power_mw": 169, "owner": "Terra-Gen Operating Co-BESS", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "5", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 3", "plant state": "CA", "plant id": "65672", "generator id": "BESS", "net summer capacity (mw)": "175.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65672", "date": "2023-05", "mw": 175}, "first_month": "2022-06", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-05", "to": "2023-08", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 175, "to": 169, "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "10", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 3", "plant state": "CA", "plant id": "65672", "generator id": "BESS", "net summer capacity (mw)": "169", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65672", "date": "2023-10", "mw": 169}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 169, "mwh_is_estimate": true, "mwh": 338, "mwh_estimate": 338, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023-05", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Sanborn BESS 3", "name_short": "Sanborn BESS 3", "owner": "Terra-Gen Operating Co-BESS", "state": "california", "country": "usa", "lat": "40.832677000000004", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.832677000000004+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Raith (Glenniston)", "city": "Auchtertool", "id": "824", "external_id": "11808", "state": "fife", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49.5", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-little-raith-bess/", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary", "link3": "", "link4": ""}, "internal_id": "824", "external_id": "11808", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gleniston, Auchtertool - Battery Storage Facility", "external_id": "11808", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2022-11-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11808", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Gleniston, Auchtertool - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Battery Storage Facility Gleniston Auchtertool ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "22/02323/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 49, "ext_id": "11808"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/08/2022", "to": "11/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "09/11/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11808", "Record Last Updated (dd/mm/yyyy)": "11/11/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Gleniston, Auchtertool - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Battery Storage Facility Gleniston Auchtertool ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "22/02323/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 49, "ext_id": "11808"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 99, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11-09", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Gleniston, Auchtertool - Battery Storage Facility", "name_short": "Gleniston, Auchtertool", "owner": "Harmony Energy Limited", "state": "scotland", "country": "uk", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.11287+-3.271262", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bumpers", "city": "Princes Risborough", "id": "844", "external_id": "", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "56", "status": "operation", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.7485", "long": "-0.88913", "coords_hint": "1", "use_case": "", "notes": "Construction dates from TTRO application", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-bumpers-bess/", "link1": "https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "link2": "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "link3": "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "link4": "https://twitter.com/heitplc/status/1679460677226823680"}, "internal_id": "844", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 99, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Bumpers", "name_short": "Bumpers", "owner": "Harmony Energy Income Trust", "state": "buckinghamshire", "country": "uk", "lat": "51.7485", "long": "-0.88913", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.7485+-0.88913", "construction_time_month": 12, "construction_speed_mwh_per_month": 16, "no_of_battery_units": 56, "notes_split": ["Construction dates from TTRO application"], "links": ["https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "https://twitter.com/heitplc/status/1679460677226823680"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Storey Energy Center", "city": "Coolidge", "id": "67", "external_id": "65956", "state": "arizona", "country": "usa", "capacity_mwh": "264", "estimate_mwh": "", "power_mw": "88", "customer": "Salt River Project", "owner": "NextEra Energy Resources", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.8882", "long": "-111.4978", "coords_hint": "1", "use_case": "88 MW solar farm support", "notes": "", "project_website": "https://www.nexteraenergyresources.com/storey-solar.html", "link1": "https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/Storey%20Solar%20Open%20House%20Slides_final%20for%20NEER%20website.pdf", "link2": "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "link3": "", "link4": ""}, "internal_id": "67", "external_id": "65956", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Storey Solar and Storage", "external_id": "65956", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 176, "power_mw": 88, "owner": "Storey Energy Center, LLC", "status": "operation", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"STOBA": {"first": {"year": "2023", "month": "7", "entity id": "64801", "entity name": "Storey Energy Center, LLC", "plant producer type": "IPP", "plant name": "Storey Solar and Storage", "plant state": "AZ", "plant id": "65956", "generator id": "STOBA", "net summer capacity (mw)": "88", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65956", "date": "2023-07", "mw": 88}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "64801", "entity name": "Storey Energy Center, LLC", "plant producer type": "IPP", "plant name": "Storey Solar and Storage", "plant state": "AZ", "plant id": "65956", "generator id": "STOBA", "net summer capacity (mw)": "88", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65956", "date": "2023-09", "mw": 88}, "current_month": "2024-02", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 88, "mwh_is_estimate": false, "mwh": 264, "mwh_estimate": 176, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "2023-09", "start_estimated": "2023Q2", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Storey Solar and Storage", "name_short": "Storey Solar", "owner": "Storey Energy Center, LLC", "state": "arizona", "country": "usa", "lat": "32.8882", "long": "-111.4978", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.8882+-111.4978", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/Storey%20Solar%20Open%20House%20Slides_final%20for%20NEER%20website.pdf", "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fifth Standard Solar PV, LLC (Hybrid)", "city": "", "id": "168", "external_id": "64197", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "234", "power_mw": "117", "customer": "", "owner": "RWE Renewables Americas LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "168", "external_id": "64197", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Fifth Standard Solar PV, LLC (Hybrid)", "external_id": "64197", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 234, "power_mw": 117, "owner": "RWE Renewables Americas, LLC", "status": "operation", "date_first_heard": "2021-01", "start_construction": "2022-11", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FTHSB": {"first": {"year": "2022", "month": "12", "entity id": "56215", "entity name": "RWE Renewables Americas LLC", "plant producer type": "IPP", "plant name": "Fifth Standard Solar PV, LLC", "plant state": "CA", "plant id": "64197", "generator id": "FTHSB", "net summer capacity (mw)": "117", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64197", "date": "2022-12", "mw": 117}, "first_month": "2021-01", "changes": [{"month": "2021-02", "li": [{"name": "plant name", "from": "Fifth Standard Solar PV, LLC", "to": "Fifth Standard Solar PV, LLC (Hybrid)", "extra": "", "change_type": "misc"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2022-12", "to": "2022-09", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-12", "to": "2023-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "entity name", "from": "RWE Renewables Americas LLC", "to": "RWE Renewables Americas, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-10", "to": "2023-08", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "56215", "entity name": "RWE Renewables Americas, LLC", "plant producer type": "IPP", "plant name": "Fifth Standard Solar PV, LLC (Hybrid)", "plant state": "CA", "plant id": "64197", "generator id": "FTHSB", "net summer capacity (mw)": "117", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64197", "date": "2023-09", "mw": 117}, "current_month": "2024-02", "dates": {"first_heard": "2021-01", "start_construction": "2022-11"}, "month_disappeared": ""}}, "mw": 117, "mwh_is_estimate": true, "mwh": 234, "mwh_estimate": 234, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-01", "start_construction": "2022-11", "start_operation": "2023-09", "start_estimated": "2022-09", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Fifth Standard Solar PV, LLC (Hybrid)", "name_short": "Fifth Standard Solar PV, LLC (Hybri...", "owner": "RWE Renewables Americas, LLC", "state": "california", "country": "usa", "lat": "41.296661434678576", "long": "-121.53951803033499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.296661434678576+-121.53951803033499", "construction_time_month": 10, "construction_speed_mwh_per_month": 23, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oberon Solar Project", "city": "", "id": "701", "external_id": "65734", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "IP Oberon LLC", "developer": "Intersect Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.717864", "long": "-115.358576", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "link2": "http://www.aspeneg.com/oberon-renewable-energy-project/", "link3": "", "link4": ""}, "internal_id": "701", "external_id": "65734", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Oberon Solar Project", "external_id": "65734", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "IP Oberon LLC", "status": "operation", "date_first_heard": "2022-08", "start_construction": "2022-09", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OBIBS": {"first": {"year": "2023", "month": "6", "entity id": "64971", "entity name": "IP Oberon LLC", "plant producer type": "IPP", "plant name": "Oberon Solar Project", "plant state": "CA", "plant id": "65734", "generator id": "OBIBS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65734", "date": "2023-06", "mw": 125}, "first_month": "2022-08", "changes": [{"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "64971", "entity name": "IP Oberon LLC", "plant producer type": "IPP", "plant name": "Oberon Solar Project", "plant state": "CA", "plant id": "65734", "generator id": "OBIBS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65734", "date": "2023-09", "mw": 125}, "current_month": "2024-02", "dates": {"first_heard": "2022-08", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "2022-09", "start_operation": "2023-09", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Oberon Solar Project", "name_short": "Oberon Solar", "owner": "IP Oberon LLC", "state": "california", "country": "usa", "lat": "33.717864", "long": "-115.358576", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.717864+-115.358576", "construction_time_month": 12, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "http://www.aspeneg.com/oberon-renewable-energy-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oberon II Solar Project", "city": "", "id": "702", "external_id": "65735", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "IP Oberon II, LLC", "developer": "Intersect Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.718247", "long": "-115.35194", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "link2": "http://www.aspeneg.com/oberon-renewable-energy-project/", "link3": "", "link4": ""}, "internal_id": "702", "external_id": "65735", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Oberon II Solar Project", "external_id": "65735", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "IP Oberon II, LLC", "status": "operation", "date_first_heard": "2022-08", "start_construction": "2022-12", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OBIIB": {"first": {"year": "2023", "month": "9", "entity id": "64972", "entity name": "IP Oberon II, LLC", "plant producer type": "IPP", "plant name": "Oberon II Solar Project", "plant state": "CA", "plant id": "65735", "generator id": "OBIIB", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65735", "date": "2023-09", "mw": 125}, "first_month": "2022-08", "changes": [{"month": "2022-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "64972", "entity name": "IP Oberon II, LLC", "plant producer type": "IPP", "plant name": "Oberon II Solar Project", "plant state": "CA", "plant id": "65735", "generator id": "OBIIB", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65735", "date": "2023-09", "mw": 125}, "current_month": "2024-02", "dates": {"first_heard": "2022-08", "start_construction": "2022-12"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "2022-12", "start_operation": "2023-09", "start_estimated": "2023-09", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Oberon II Solar Project", "name_short": "Oberon II Solar", "owner": "IP Oberon II, LLC", "state": "california", "country": "usa", "lat": "33.718247", "long": "-115.35194", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.718247+-115.35194", "construction_time_month": 9, "construction_speed_mwh_per_month": 27, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "http://www.aspeneg.com/oberon-renewable-energy-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Saint Energy Storage II LLC", "city": "", "id": "1010", "external_id": "66716", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Saint Energy Storage II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1010", "external_id": "66716", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Saint Energy Storage II LLC", "external_id": "66716", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Saint Energy Storage II LLC", "status": "operation", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SB123": {"first": {"year": "2023", "month": "7", "entity id": "65727", "entity name": "Saint Energy Storage II LLC", "plant producer type": "IPP", "plant name": "Saint Energy Storage II LLC", "plant state": "AZ", "plant id": "66716", "generator id": "SB123", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66716", "date": "2023-07", "mw": 100}, "first_month": "2023-07", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "9", "entity id": "65727", "entity name": "Saint Energy Storage II LLC", "plant producer type": "IPP", "plant name": "Saint Energy Storage II LLC", "plant state": "AZ", "plant id": "66716", "generator id": "SB123", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66716", "date": "2023-09", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "2023-09", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Saint Energy Storage II LLC", "name_short": "Saint Energy Storage II", "owner": "Saint Energy Storage II LLC", "state": "arizona", "country": "usa", "lat": "36.478429", "long": "-109.905254", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.478429+-109.905254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mohave Energy - Hybrid", "city": "", "id": "1308", "external_id": "67178", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Mohave Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1308", "external_id": "67178", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mohave Energy - Hybrid", "external_id": "67178", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Mohave Energy", "status": "operation", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MEBA": {"first": {"year": "2023", "month": "9", "entity id": "66056", "entity name": "Mohave Energy", "plant producer type": "Electric Utility", "plant name": "Mohave Energy - Hybrid", "plant state": "AZ", "plant id": "67178", "generator id": "MEBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "67178", "date": "2023-09", "mw": 15}, "first_month": "2024-02", "changes": [], "current": {"year": "2023", "month": "9", "entity id": "66056", "entity name": "Mohave Energy", "plant producer type": "Electric Utility", "plant name": "Mohave Energy - Hybrid", "plant state": "AZ", "plant id": "67178", "generator id": "MEBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "67178", "date": "2023-09", "mw": 15}, "current_month": "2024-02", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "2023-09", "start_estimated": "", "month_disappeared": "", "go_live": "2023-09", "go_live_year_int": 2023, "name": "Mohave Energy - Hybrid", "name_short": "Mohave Energy", "owner": "Mohave Energy", "state": "arizona", "country": "usa", "lat": "36.58187920440347", "long": "-110.02764099100999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.58187920440347+-110.02764099100999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Resurgence Solar", "city": "", "id": "169", "external_id": "64489", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "230", "power_mw": "115", "customer": "", "owner": "Resurgence Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "169", "external_id": "64489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Resurgence Solar", "external_id": "64489", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Resurgence Solar", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2023-03", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN2": {"first": {"year": "2022", "month": "12", "entity id": "64135", "entity name": "Resurgence Solar", "plant producer type": "IPP", "plant name": "Resurgence Solar", "plant state": "CA", "plant id": "64489", "generator id": "GEN2", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64489", "date": "2022-12", "mw": 115}, "first_month": "2021-04", "changes": [{"month": "2022-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-12", "to": "2023-05", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-05", "to": "2023-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 115, "to": 75, "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "64135", "entity name": "Resurgence Solar", "plant producer type": "IPP", "plant name": "Resurgence Solar", "plant state": "CA", "plant id": "64489", "generator id": "GEN2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64489", "date": "2023-08", "mw": 75}, "current_month": "2024-02", "dates": {"first_heard": "2021-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2023-03", "start_operation": "2023-08", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "Resurgence Solar", "name_short": "Resurgence Solar", "owner": "Resurgence Solar", "state": "california", "country": "usa", "lat": "41.22094440421124", "long": "-121.60248497218186", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.22094440421124+-121.60248497218186", "construction_time_month": 5, "construction_speed_mwh_per_month": 30, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Energy Centre Royal Mint", "city": "", "id": "403", "external_id": "7684", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Infinite Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-12-09", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "403", "external_id": "7684", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Energy Centre Royal Mint", "external_id": "7684", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Infinite Energy Renewables", "status": "operation", "date_first_heard": "2019-12-09", "start_construction": "2022-05-01", "start_operation": "2023-08-01", "start_estimated": "", "month_disappeared": "", "lat": "51.555048", "long": "-3.390758", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7684", "Record Last Updated (dd/mm/yyyy)": "17/08/2020", "Operator (or Applicant)": "Infinite Energy Renewables", "Site Name": "Energy Centre Royal Mint", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Royal Mint, Llantrisant, Pontyclun, Mid Glamorgan", "County": "Rhondda Cynon Taff", "Region": "Wales", "Country": "Wales", "Post Code": "CF72 8YT", "X-coordinate": "303676", "Y-coordinate": "184935", "Planning Authority": "Rhondda Cynon Taff County Borough Council", "Planning Application Reference": "19/1007/10", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/12/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/12/2024", "Under Construction": "01/04/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.555048", "long": "-3.390758", "status": "construction", "mw": 20, "ext_id": "7684"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/08/2020", "to": "16/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/04/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/02/2022", "to": "01/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/08/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7684", "Record Last Updated (dd/mm/yyyy)": "01/08/2023", "Operator (or Applicant)": "Infinite Energy Renewables", "Site Name": "Energy Centre Royal Mint", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Royal Mint, Llantrisant, Pontyclun, Mid Glamorgan", "County": "Rhondda Cynon Taff", "Region": "Wales", "Country": "Wales", "Post Code": "CF72 8YT", "X-coordinate": "303676", "Y-coordinate": "184935", "Planning Authority": "Rhondda Cynon Taff County Borough Council", "Planning Application Reference": "19/1007/10", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/12/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/12/2024", "Under Construction": "01/05/2022", "Operational": "01/08/2023", "Heat Network Ref": "", "lat": "51.555048", "long": "-3.390758", "status": "operation", "mw": 20, "ext_id": "7684"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-17", "start_construction": "", "start_operation": "2023-08-01"}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-12-09", "start_construction": "2022-05-01", "start_operation": "2023-08-01", "start_estimated": "", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "Energy Centre Royal Mint", "name_short": "Energy Centre Royal Mint", "owner": "Infinite Energy Renewables", "state": "wales", "country": "uk", "lat": "51.555048", "long": "-3.390758", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.555048+-3.390758", "construction_time_month": 15, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cunningham Storage", "city": "", "id": "627", "external_id": "65410", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "380", "power_mw": "190", "customer": "", "owner": "BT Cunningham Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "627", "external_id": "65410", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cunningham Storage", "external_id": "65410", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 380, "power_mw": 190, "owner": "Acciona Energy USA Global, LLC", "status": "operation", "date_first_heard": "2022-03", "start_construction": "2022-09", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SPUT": {"first": {"year": "2022", "month": "12", "entity id": "64757", "entity name": "BT Cunningham Storage, LLC", "plant producer type": "IPP", "plant name": "Cunningham Storage", "plant state": "TX", "plant id": "65410", "generator id": "SPUT", "net summer capacity (mw)": "190", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65410", "date": "2022-12", "mw": 190}, "first_month": "2022-03", "changes": [{"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "entity id", "from": "64757", "to": "57416", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "BT Cunningham Storage, LLC", "to": "Acciona Energy USA Global, LLC", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "57416", "entity name": "Acciona Energy USA Global, LLC", "plant producer type": "IPP", "plant name": "Cunningham Storage", "plant state": "TX", "plant id": "65410", "generator id": "SPUT", "net summer capacity (mw)": "190", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65410", "date": "2023-08", "mw": 190}, "current_month": "2024-02", "dates": {"first_heard": "2022-03", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 190, "mwh_is_estimate": true, "mwh": 380, "mwh_estimate": 380, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-03", "start_construction": "2022-09", "start_operation": "2023-08", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "Cunningham Storage", "name_short": "Cunningham", "owner": "Acciona Energy USA Global, LLC", "state": "texas", "country": "usa", "lat": "33.61100329690874", "long": "-95.38746833894474", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.61100329690874+-95.38746833894474", "construction_time_month": 11, "construction_speed_mwh_per_month": 34, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Central Valley", "city": "", "id": "933", "external_id": "66208", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "132", "customer": "", "owner": "North Central Valley Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "933", "external_id": "66208", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "North Central Valley", "external_id": "66208", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 264, "power_mw": 132, "owner": "North Central Valley Energy Storage, LLC", "status": "operation", "date_first_heard": "2023-02", "start_construction": "2023-05", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NCV": {"first": {"year": "2023", "month": "8", "entity id": "65339", "entity name": "North Central Valley Energy Storage, LLC", "plant producer type": "IPP", "plant name": "North Central Valley", "plant state": "CA", "plant id": "66208", "generator id": "NCV", "net summer capacity (mw)": "132", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66208", "date": "2023-08", "mw": 132}, "first_month": "2023-02", "changes": [{"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "65339", "entity name": "North Central Valley Energy Storage, LLC", "plant producer type": "IPP", "plant name": "North Central Valley", "plant state": "CA", "plant id": "66208", "generator id": "NCV", "net summer capacity (mw)": "132", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66208", "date": "2023-08", "mw": 132}, "current_month": "2024-02", "dates": {"first_heard": "2023-02", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 132, "mwh_is_estimate": true, "mwh": 264, "mwh_estimate": 264, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "2023-05", "start_operation": "2023-08", "start_estimated": "2023-08", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "North Central Valley", "name_short": "North Central Valley", "owner": "North Central Valley Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.02074085870876", "long": "-121.37410994178886", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.02074085870876+-121.37410994178886", "construction_time_month": 3, "construction_speed_mwh_per_month": 88, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "VESI Pomona", "city": "", "id": "960", "external_id": "50300", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI Pomona Energy Storage, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "960", "external_id": "50300", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "VESI Pomona", "external_id": "50300", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "VESI Pomona Energy Storage, Inc.", "status": "operation", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS2": {"first": {"year": "2023", "month": "5", "entity id": "54736", "entity name": "VESI Pomona Energy Storage, Inc.", "plant producer type": "IPP", "plant name": "VESI Pomona", "plant state": "CA", "plant id": "50300", "generator id": "BESS2", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "50300", "date": "2023-05", "mw": 20}, "first_month": "2023-03", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-10", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-08", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2023", "month": "8", "entity id": "54736", "entity name": "VESI Pomona Energy Storage, Inc.", "plant producer type": "IPP", "plant name": "VESI Pomona", "plant state": "CA", "plant id": "50300", "generator id": "BESS2", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "50300", "date": "2023-08", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-08", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "VESI Pomona", "name_short": "VESI Pomona", "owner": "VESI Pomona Energy Storage, Inc.", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.180049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.180049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BCE Los Alamitos 1", "city": "", "id": "965", "external_id": "66533", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Bright Canyon Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "965", "external_id": "66533", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "BCE Los Alamitos 1", "external_id": "66533", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Bright Canyon Energy", "status": "operation", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCE12": {"first": {"year": "2023", "month": "7", "entity id": "65534", "entity name": "Bright Canyon Energy", "plant producer type": "IPP", "plant name": "BCE Los Alamitos 1", "plant state": "CA", "plant id": "66533", "generator id": "BCE12", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66533", "date": "2023-07", "mw": 10}, "first_month": "2023-05", "changes": [{"month": "2023-06", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "65534", "entity name": "Bright Canyon Energy", "plant producer type": "IPP", "plant name": "BCE Los Alamitos 1", "plant state": "CA", "plant id": "66533", "generator id": "BCE12", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66533", "date": "2023-08", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "2023-08", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "BCE Los Alamitos 1", "name_short": "BCE Los Alamitos 1", "owner": "Bright Canyon Energy", "state": "california", "country": "usa", "lat": "41.352677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.352677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BCE Los Alamitos 2", "city": "", "id": "966", "external_id": "66532", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Bright Canyon Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "966", "external_id": "66532", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "BCE Los Alamitos 2", "external_id": "66532", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Bright Canyon Energy", "status": "operation", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCE22": {"first": {"year": "2023", "month": "7", "entity id": "65534", "entity name": "Bright Canyon Energy", "plant producer type": "IPP", "plant name": "BCE Los Alamitos 2", "plant state": "CA", "plant id": "66532", "generator id": "BCE22", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66532", "date": "2023-07", "mw": 10}, "first_month": "2023-05", "changes": [{"month": "2023-06", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "65534", "entity name": "Bright Canyon Energy", "plant producer type": "IPP", "plant name": "BCE Los Alamitos 2", "plant state": "CA", "plant id": "66532", "generator id": "BCE22", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66532", "date": "2023-08", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "2023-08", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "BCE Los Alamitos 2", "name_short": "BCE Los Alamitos 2", "owner": "Bright Canyon Energy", "state": "california", "country": "usa", "lat": "41.362343242106384", "long": "-121.37792128258249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.362343242106384+-121.37792128258249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Resurgence Solar II", "city": "", "id": "1018", "external_id": "66620", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Resurgence Solar II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1018", "external_id": "66620", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Resurgence Solar II", "external_id": "66620", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Resurgence Solar II", "status": "operation", "date_first_heard": "2023-06", "start_construction": "2023-07", "start_operation": "2023-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN2": {"first": {"year": "2023", "month": "7", "entity id": "65647", "entity name": "Resurgence Solar II", "plant producer type": "IPP", "plant name": "Resurgence Solar II", "plant state": "CA", "plant id": "66620", "generator id": "GEN2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66620", "date": "2023-07", "mw": 40}, "first_month": "2023-06", "changes": [{"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "8", "entity id": "65647", "entity name": "Resurgence Solar II", "plant producer type": "IPP", "plant name": "Resurgence Solar II", "plant state": "CA", "plant id": "66620", "generator id": "GEN2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66620", "date": "2023-08", "mw": 40}, "current_month": "2024-02", "dates": {"first_heard": "2023-06", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-06", "start_construction": "2023-07", "start_operation": "2023-08", "start_estimated": "2023-07", "month_disappeared": "", "go_live": "2023-08", "go_live_year_int": 2023, "name": "Resurgence Solar II", "name_short": "Resurgence Solar II", "owner": "Resurgence Solar II", "state": "california", "country": "usa", "lat": "41.00747109055068", "long": "-121.14148166910252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.00747109055068+-121.14148166910252", "construction_time_month": 1, "construction_speed_mwh_per_month": 80, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sonoran Energy Center", "city": "Buckeye", "id": "63", "external_id": "66627", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "260", "customer": "Salt River Project", "owner": "NextEra Energy Resources", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.23927", "long": "-112.570054", "coords_hint": "2", "use_case": "solar", "notes": "", "project_website": "https://www.nexteraenergyresources.com/sonoran-solar/project-overview.html", "link1": "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "link2": "https://pv-magazine-usa.com/2021/08/11/nextera-will-build-a-solar-storage-project-with-salt-river-project-as-offtaker/", "link3": "", "link4": ""}, "internal_id": "63", "external_id": "66627", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sonoran Solar Energy", "external_id": "66627", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 520, "power_mw": 260, "owner": "Sonoran Solar Energy, LLC", "status": "operation", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SON13": {"first": {"year": "2023", "month": "6", "entity id": "65652", "entity name": "Sonoran Solar Energy, LLC", "plant producer type": "IPP", "plant name": "Sonoran Solar Energy", "plant state": "AZ", "plant id": "66627", "generator id": "SON13", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66627", "date": "2023-06", "mw": 260}, "first_month": "2023-06", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65652", "entity name": "Sonoran Solar Energy, LLC", "plant producer type": "IPP", "plant name": "Sonoran Solar Energy", "plant state": "AZ", "plant id": "66627", "generator id": "SON13", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66627", "date": "2023-07", "mw": 260}, "current_month": "2024-02", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 260, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 520, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2023Q2", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Sonoran Solar Energy", "name_short": "Sonoran Solar", "owner": "Sonoran Solar Energy, LLC", "state": "arizona", "country": "usa", "lat": "33.23927", "long": "-112.570054", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.23927+-112.570054", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "https://pv-magazine-usa.com/2021/08/11/nextera-will-build-a-solar-storage-project-with-salt-river-project-as-offtaker/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arroyo", "city": "McKinley County", "id": "101", "external_id": "63172", "state": "new mexico", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "PNM", "owner": "DE Shaw Renewable Investments (DSRI)", "developer": "Affordable Solar", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-03", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "450", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.9703", "long": "-107.5631", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ** the testimony link has a lot of info ** got the location info from the gem wiki", "project_website": "", "link1": "https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "link2": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link3": "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "link4": "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"}, "internal_id": "101", "external_id": "63172", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arroyo Solar Energy Storage Hybrid", "external_id": "63172", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Arroyo Solar LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-10", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARESS": {"first": {"year": "2022", "month": "6", "entity id": "62921", "entity name": "Arroyo Solar LLC", "plant producer type": "IPP", "plant name": "Arroyo Solar Energy Storage Hybrid", "plant state": "NM", "plant id": "63172", "generator id": "ARESS", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63172", "date": "2022-06", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "mw", "from": 40, "to": 150, "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "62921", "entity name": "Arroyo Solar LLC", "plant producer type": "IPP", "plant name": "Arroyo Solar Energy Storage Hybrid", "plant state": "NM", "plant id": "63172", "generator id": "ARESS", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63172", "date": "2023-07", "mw": 150}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-10"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-10", "start_operation": "2023-07", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Arroyo Solar Energy Storage Hybrid", "name_short": "Arroyo Solar", "owner": "Arroyo Solar LLC", "state": "new mexico", "country": "usa", "lat": "35.9703", "long": "-107.5631", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.9703+-107.5631", "construction_time_month": 21, "construction_speed_mwh_per_month": 28, "no_of_battery_units": 0, "notes_split": ["2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ", " the testimony link has a lot of info ", " got the location info from the gem wiki"], "links": ["https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Daggett 3", "city": "", "id": "165", "external_id": "64852", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "288", "power_mw": "144", "customer": "", "owner": "Daggett Solar Power 3 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "165", "external_id": "64852", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Daggett 3", "external_id": "64852", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 298, "power_mw": 149, "owner": "Daggett Solar Power 3 LLC", "status": "operation", "date_first_heard": "2021-09", "start_construction": "2022-02", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DAGGB": {"first": {"year": "2022", "month": "12", "entity id": "64365", "entity name": "Daggett Solar Power 3 LLC", "plant producer type": "IPP", "plant name": "Daggett 3", "plant state": "CA", "plant id": "64852", "generator id": "DAGGB", "net summer capacity (mw)": "144", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64852", "date": "2022-12", "mw": 144}, "first_month": "2021-09", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-12", "to": "2023-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "mw", "from": 144, "to": 149, "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-09", "to": "2023-06", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "64365", "entity name": "Daggett Solar Power 3 LLC", "plant producer type": "IPP", "plant name": "Daggett 3", "plant state": "CA", "plant id": "64852", "generator id": "DAGGB", "net summer capacity (mw)": "149", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64852", "date": "2023-07", "mw": 149}, "current_month": "2024-02", "dates": {"first_heard": "2021-09", "start_construction": "2022-02"}, "month_disappeared": ""}}, "mw": 149, "mwh_is_estimate": true, "mwh": 298, "mwh_estimate": 298, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "2022-02", "start_operation": "2023-07", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Daggett 3", "name_short": "Daggett 3", "owner": "Daggett Solar Power 3 LLC", "state": "california", "country": "usa", "lat": "41.352677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.352677+-121.300049", "construction_time_month": 17, "construction_speed_mwh_per_month": 17, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Willis Battery Storage", "city": "", "id": "235", "external_id": "63238", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "New York Power Authority", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "235", "external_id": "63238", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Willis Battery Storage", "external_id": "63238", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "New York Power Authority", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-06", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WB1": {"first": {"year": "2021", "month": "6", "entity id": "15296", "entity name": "New York Power Authority", "plant producer type": "Electric Utility", "plant name": "Willis Battery Storage", "plant state": "NY", "plant id": "63238", "generator id": "WB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63238", "date": "2021-06", "mw": 20}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-09", "to": "2022-03", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2022-03", "to": "2022-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-09", "to": "2023-07", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2023", "month": "7", "entity id": "15296", "entity name": "New York Power Authority", "plant producer type": "Electric Utility", "plant name": "Willis Battery Storage", "plant state": "NY", "plant id": "63238", "generator id": "WB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63238", "date": "2023-07", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-06", "start_operation": "2023-07", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Willis Battery Storage", "name_short": "Willis", "owner": "New York Power Authority", "state": "new york", "country": "usa", "lat": "42.482006999999996", "long": "-75.50354", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.482006999999996+-75.50354", "construction_time_month": 25, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Roadrunner, LLC Hybrid", "city": "", "id": "254", "external_id": "62561", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Roadrunner Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "254", "external_id": "62561", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Roadrunner, LLC Hybrid", "external_id": "62561", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Roadrunner Solar, LLC", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2022-01", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "5", "entity id": "62047", "entity name": "Roadrunner Solar, LLC", "plant producer type": "IPP", "plant name": "Roadrunner, LLC Hybrid", "plant state": "TX", "plant id": "62561", "generator id": "BA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62561", "date": "2022-05", "mw": 50}, "first_month": "2021-06", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2023-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "62047", "entity name": "Roadrunner Solar, LLC", "plant producer type": "IPP", "plant name": "Roadrunner, LLC Hybrid", "plant state": "TX", "plant id": "62561", "generator id": "BA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62561", "date": "2023-07", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2021-06", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2022-01", "start_operation": "2023-07", "start_estimated": "2022-05", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Roadrunner, LLC Hybrid", "name_short": "Roadrunner", "owner": "Roadrunner Solar, LLC", "state": "texas", "country": "usa", "lat": "33.27525537493651", "long": "-95.3315331949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.27525537493651+-95.3315331949425", "construction_time_month": 18, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dollymans Storage", "city": "", "id": "335", "external_id": "7088", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Statera Energy / Dollymans Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "335", "external_id": "7088", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dollymans Storage", "external_id": "7088", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Statera Energy / Dollymans Storage", "status": "operation", "date_first_heard": "2021-11-05", "start_construction": "", "start_operation": "2023-07-01", "start_estimated": "", "month_disappeared": "", "lat": "51.593684", "long": "0.563833", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7088", "Record Last Updated (dd/mm/yyyy)": "28/05/2021", "Operator (or Applicant)": "Statera Energy / Dollymans Storage", "Site Name": "Dollymans Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.98", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS11 8UD", "X-coordinate": "577686", "Y-coordinate": "191429", "Planning Authority": "Rochford District Council", "Planning Application Reference": "21/00522/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.593684", "long": "0.563833", "status": "planning", "mw": 99, "ext_id": "7088"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "05/11/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Address", "from": "Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, Essex", "to": "Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, ", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "05/11/2023", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/05/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "28/05/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/07/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7088", "Record Last Updated (dd/mm/yyyy)": "28/05/2021", "Operator (or Applicant)": "Statera Energy / Dollymans Storage", "Site Name": "Dollymans Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.98", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS11 8UD", "X-coordinate": "577686", "Y-coordinate": "191429", "Planning Authority": "Rochford District Council", "Planning Application Reference": "21/00522/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/11/2023", "Under Construction": "", "Operational": "01/07/2023", "Heat Network Ref": "", "lat": "51.593684", "long": "0.563833", "status": "operation", "mw": 99, "ext_id": "7088"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-28", "start_construction": "", "start_operation": "2021-05-28"}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11-05", "start_construction": "", "start_operation": "2023-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Dollymans Storage", "name_short": "Dollymans", "owner": "Statera Energy / Dollymans Storage", "state": "eastern", "country": "uk", "lat": "51.593684", "long": "0.563833", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.593684+0.563833", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Roseland Solar Project, LLC", "city": "", "id": "629", "external_id": "65028", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "118", "power_mw": "59", "customer": "", "owner": "Enel Green Power Roseland Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "629", "external_id": "65028", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Roseland Solar Project, LLC", "external_id": "65028", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 118, "power_mw": 59, "owner": "Enel Green Power Roseland Solar, LLC", "status": "operation", "date_first_heard": "2022-03", "start_construction": "2022-08", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ROSEB": {"first": {"year": "2022", "month": "11", "entity id": "64438", "entity name": "Enel Green Power Roseland Solar, LLC", "plant producer type": "IPP", "plant name": "Roseland Solar Project, LLC", "plant state": "TX", "plant id": "65028", "generator id": "ROSEB", "net summer capacity (mw)": "59.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65028", "date": "2022-11", "mw": 59}, "first_month": "2022-03", "changes": [{"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "64438", "entity name": "Enel Green Power Roseland Solar, LLC", "plant producer type": "IPP", "plant name": "Roseland Solar Project, LLC", "plant state": "TX", "plant id": "65028", "generator id": "ROSEB", "net summer capacity (mw)": "59.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65028", "date": "2023-07", "mw": 59}, "current_month": "2024-02", "dates": {"first_heard": "2022-03", "start_construction": "2022-08"}, "month_disappeared": ""}}, "mw": 59, "mwh_is_estimate": true, "mwh": 118, "mwh_estimate": 118, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-03", "start_construction": "2022-08", "start_operation": "2023-07", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Roseland Solar Project, LLC", "name_short": "Roseland Solar Project", "owner": "Enel Green Power Roseland Solar, LLC", "state": "texas", "country": "usa", "lat": "33.527600044661234", "long": "-95.49978945087824", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.527600044661234+-95.49978945087824", "construction_time_month": 11, "construction_speed_mwh_per_month": 10, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn S4", "city": "", "id": "710", "external_id": "65677", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "710", "external_id": "65677", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn S4", "external_id": "65677", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 36, "power_mw": 18, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S4", "plant state": "CA", "plant id": "65677", "generator id": "BESS", "net summer capacity (mw)": "20.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65677", "date": "2022-12", "mw": 20}, "first_month": "2022-06", "changes": [{"month": "2022-10", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "mw", "from": 20, "to": 18, "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S4", "plant state": "CA", "plant id": "65677", "generator id": "BESS", "net summer capacity (mw)": "18.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65677", "date": "2023-07", "mw": 18}, "current_month": "2024-02", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 18, "mwh_is_estimate": true, "mwh": 36, "mwh_estimate": 36, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Edwards Sanborn S4", "name_short": "Edwards Sanborn S4", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.320049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.320049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX19 River Valley Storage 1", "city": "", "id": "724", "external_id": "65699", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "724", "external_id": "65699", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX19 River Valley Storage 1", "external_id": "65699", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX19": {"first": {"year": "2022", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX19 River Valley Storage 1", "plant state": "TX", "plant id": "65699", "generator id": "TX19", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65699", "date": "2022-12", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX19 River Valley Storage 1", "plant state": "TX", "plant id": "65699", "generator id": "TX19", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65699", "date": "2023-07", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "TX19 River Valley Storage 1", "name_short": "TX19 River Valley Storage 1", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.57578923408578", "long": "-95.23388382472001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.57578923408578+-95.23388382472001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX21 River Valley Storage 2", "city": "", "id": "725", "external_id": "65700", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "725", "external_id": "65700", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX21 River Valley Storage 2", "external_id": "65700", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX21": {"first": {"year": "2022", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX21 River Valley Storage 2", "plant state": "TX", "plant id": "65700", "generator id": "TX21", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65700", "date": "2022-12", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX21 River Valley Storage 2", "plant state": "TX", "plant id": "65700", "generator id": "TX21", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65700", "date": "2023-07", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "TX21 River Valley Storage 2", "name_short": "TX21 River Valley Storage 2", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.604054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.604054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mesquite Solar 5, LLC", "city": "", "id": "772", "external_id": "65963", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "772", "external_id": "65963", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mesquite Solar 5, LLC", "external_id": "65963", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Consolidated Edison Development Inc.", "status": "operation", "date_first_heard": "2022-10", "start_construction": "2022-11", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MS5B": {"first": {"year": "2023", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Mesquite Solar 5, LLC", "plant state": "AZ", "plant id": "65963", "generator id": "MS5B", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65963", "date": "2023-06", "mw": 60}, "first_month": "2022-10", "changes": [{"month": "2022-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2023-07", "extra": "accelerated by 5 months", "change_type": "timing"}]}], "current": {"year": "2023", "month": "7", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Mesquite Solar 5, LLC", "plant state": "AZ", "plant id": "65963", "generator id": "MS5B", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65963", "date": "2023-07", "mw": 60}, "current_month": "2024-02", "dates": {"first_heard": "2022-10", "start_construction": "2022-11"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-10", "start_construction": "2022-11", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Mesquite Solar 5, LLC", "name_short": "Mesquite Solar 5", "owner": "Consolidated Edison Development Inc.", "state": "arizona", "country": "usa", "lat": "36.37027651357818", "long": "-110.034113126965", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.37027651357818+-110.034113126965", "construction_time_month": 8, "construction_speed_mwh_per_month": 15, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Peak Energy Storage I", "city": "", "id": "853", "external_id": "65987", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "650", "power_mw": "325", "customer": "", "owner": "Desert Peak Energy Storage I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "853", "external_id": "65987", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Peak Energy Storage I", "external_id": "65987", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 650, "power_mw": 325, "owner": "Desert Peak Energy Storage I, LLC", "status": "operation", "date_first_heard": "2022-11", "start_construction": "2023-03", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DP1": {"first": {"year": "2023", "month": "6", "entity id": "65168", "entity name": "Desert Peak Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Desert Peak Energy Storage I", "plant state": "CA", "plant id": "65987", "generator id": "DP1", "net summer capacity (mw)": "325", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65987", "date": "2023-06", "mw": 325}, "first_month": "2022-11", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65168", "entity name": "Desert Peak Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Desert Peak Energy Storage I", "plant state": "CA", "plant id": "65987", "generator id": "DP1", "net summer capacity (mw)": "325", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65987", "date": "2023-07", "mw": 325}, "current_month": "2024-02", "dates": {"first_heard": "2022-11", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 325, "mwh_is_estimate": true, "mwh": 650, "mwh_estimate": 650, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "2023-03", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Desert Peak Energy Storage I", "name_short": "Desert Peak Energy Storage I", "owner": "Desert Peak Energy Storage I, LLC", "state": "california", "country": "usa", "lat": "40.98838017893376", "long": "-121.39762135188055", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98838017893376+-121.39762135188055", "construction_time_month": 4, "construction_speed_mwh_per_month": 162, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Peak Energy Storage II", "city": "", "id": "856", "external_id": "65988", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Desert Peak Energy Storage II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "856", "external_id": "65988", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Peak Energy Storage II", "external_id": "65988", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Desert Peak Energy Storage II, LLC", "status": "operation", "date_first_heard": "2022-11", "start_construction": "2023-03", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DP2": {"first": {"year": "2023", "month": "6", "entity id": "65169", "entity name": "Desert Peak Energy Storage II, LLC", "plant producer type": "IPP", "plant name": "Desert Peak Energy Storage II", "plant state": "CA", "plant id": "65988", "generator id": "DP2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65988", "date": "2023-06", "mw": 75}, "first_month": "2022-11", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65169", "entity name": "Desert Peak Energy Storage II, LLC", "plant producer type": "IPP", "plant name": "Desert Peak Energy Storage II", "plant state": "CA", "plant id": "65988", "generator id": "DP2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65988", "date": "2023-07", "mw": 75}, "current_month": "2024-02", "dates": {"first_heard": "2022-11", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "2023-03", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Desert Peak Energy Storage II", "name_short": "Desert Peak Energy Storage II", "owner": "Desert Peak Energy Storage II, LLC", "state": "california", "country": "usa", "lat": "40.902031888219526", "long": "-121.22835705730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.902031888219526+-121.22835705730502", "construction_time_month": 4, "construction_speed_mwh_per_month": 37, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jicarilla Solar 1 LLC", "city": "", "id": "937", "external_id": "66163", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Repsol Renewables NA", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "937", "external_id": "66163", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Jicarilla Solar 1 LLC", "external_id": "66163", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Repsol Renewables NA", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"JICB1": {"first": {"year": "2023", "month": "3", "entity id": "65265", "entity name": "Repsol Renewables NA", "plant producer type": "IPP", "plant name": "Jicarilla Solar 1 LLC", "plant state": "NM", "plant id": "66163", "generator id": "JICB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66163", "date": "2023-03", "mw": 20}, "first_month": "2023-02", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65265", "entity name": "Repsol Renewables NA", "plant producer type": "IPP", "plant name": "Jicarilla Solar 1 LLC", "plant state": "NM", "plant id": "66163", "generator id": "JICB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66163", "date": "2023-07", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2023-03", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Jicarilla Solar 1 LLC", "name_short": "Jicarilla Solar 1", "owner": "Repsol Renewables NA", "state": "new mexico", "country": "usa", "lat": "36.27673136320376", "long": "-103.5521929560094", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.27673136320376+-103.5521929560094", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yellow Pine Solar", "city": "", "id": "975", "external_id": "66357", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "96", "power_mw": "48", "customer": "", "owner": "Yellow Pine Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "975", "external_id": "66357", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Yellow Pine Solar", "external_id": "66357", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 96, "power_mw": 48, "owner": "Yellow Pine Solar, LLC", "status": "operation", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"YPES": {"first": {"year": "2023", "month": "6", "entity id": "65453", "entity name": "Yellow Pine Solar, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine Solar", "plant state": "NV", "plant id": "66357", "generator id": "YPES", "net summer capacity (mw)": "26.7", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66357", "date": "2023-06", "mw": 26}, "first_month": "2023-03", "changes": [{"month": "2023-05", "li": [{"name": "mw", "from": 26, "to": 48, "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65453", "entity name": "Yellow Pine Solar, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine Solar", "plant state": "NV", "plant id": "66357", "generator id": "YPES", "net summer capacity (mw)": "48.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66357", "date": "2023-07", "mw": 48}, "current_month": "2024-02", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 48, "mwh_is_estimate": true, "mwh": 96, "mwh_estimate": 96, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Yellow Pine Solar", "name_short": "Yellow Pine Solar", "owner": "Yellow Pine Solar, LLC", "state": "nevada", "country": "usa", "lat": "41.293396", "long": "-114.906006", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.293396+-114.906006", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wolf Tank Storage", "city": "", "id": "1028", "external_id": "66616", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Wolf Tank Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1028", "external_id": "66616", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wolf Tank Storage", "external_id": "66616", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Wolf Tank Storage LLC", "status": "operation", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "5", "entity id": "65642", "entity name": "Wolf Tank Storage LLC", "plant producer type": "IPP", "plant name": "Wolf Tank Storage", "plant state": "TX", "plant id": "66616", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66616", "date": "2023-05", "mw": 150}, "first_month": "2023-06", "changes": [{"month": "2023-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "65642", "entity name": "Wolf Tank Storage LLC", "plant producer type": "IPP", "plant name": "Wolf Tank Storage", "plant state": "TX", "plant id": "66616", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66616", "date": "2023-07", "mw": 150}, "current_month": "2024-02", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "2023-07", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Wolf Tank Storage", "name_short": "Wolf Tank", "owner": "Wolf Tank Storage LLC", "state": "texas", "country": "usa", "lat": "33.58101561449517", "long": "-95.448185670785", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.58101561449517+-95.448185670785", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gigafactory Texas", "city": "", "id": "1176", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "125", "customer": "", "owner": "Tesla", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "68", "status": "operation", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.230756", "long": "-97.615973", "coords_hint": "1", "use_case": "", "notes": "used date of tweet for the operation start date", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1681503667030212608", "link2": "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "link3": "https://twitter.com/SawyerMerritt/status/1682834256928571392", "link4": "https://x.com/Tesla_Megapack/status/1791530954261172681"}, "internal_id": "1176", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 125, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Gigafactory Texas", "name_short": "Gigafactory Texas", "owner": "Tesla", "state": "texas", "country": "usa", "lat": "30.230756", "long": "-97.615973", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.230756+-97.615973", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 68, "notes_split": ["used date of tweet for the operation start date"], "links": ["https://twitter.com/Tesla_Megapack/status/1681503667030212608", "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "https://twitter.com/SawyerMerritt/status/1682834256928571392", "https://x.com/Tesla_Megapack/status/1791530954261172681"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Moss Landing", "city": "Moss Landing", "id": "37", "external_id": "260", "state": "california", "country": "usa", "capacity_mwh": "1600", "estimate_mwh": "", "power_mw": "400", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "LG", "type": "", "cells": "LG", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-02-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.806072", "long": "-121.782258", "coords_hint": "1", "use_case": "", "notes": "TR1200 rack design with JH4 cell, 4500+ racks, two stages here ** incident: septemter 2021 the first phase 1200 MWh was shut down after an overheating triggered the sprinkler system. ", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://www.energy-storage.news/manufacturer-reveals-involvement-in-worlds-biggest-battery-energy-storage-system-so-far/", "link2": "https://insideevs.com/news/489894/vistra-moss-landing-energy-storage-world-largest/", "link3": "https://reneweconomy.com.au/worlds-biggest-battery-sidelined-after-overheating-incident-in-california/", "link4": ""}, "internal_id": "37", "external_id": "260", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dynegy Moss Landing Power Plant Hybrid", "external_id": "260", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 1500, "power_mw": 750, "owner": "Dynegy -Moss Landing LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-09", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BAT1": {"first": {"year": "2020", "month": "12", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "260", "date": "2020-12", "mw": 300}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "date", "from": "2020-12", "to": "2021-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "date", "from": "2021-03", "to": "2021-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-06", "to": "2021-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "5", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "260", "date": "2021-05", "mw": 300}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}, "BAT2": {"first": {"year": "2021", "month": "5", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "260", "date": "2021-05", "mw": 100}, "first_month": "2021-11", "changes": [], "current": {"year": "2021", "month": "5", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "260", "date": "2021-05", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}, "BAT3": {"first": {"year": "2023", "month": "6", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT3", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "260", "date": "2023-06", "mw": 350}, "first_month": "2022-04", "changes": [{"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "54802", "entity name": "Dynegy -Moss Landing LLC", "plant producer type": "IPP", "plant name": "Dynegy Moss Landing Power Plant Hybrid", "plant state": "CA", "plant id": "260", "generator id": "BAT3", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "260", "date": "2023-06", "mw": 350}, "current_month": "2024-02", "dates": {"first_heard": "2022-04", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 750, "mwh_is_estimate": false, "mwh": 1600, "mwh_estimate": 1500, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-09", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Dynegy Moss Landing Power Plant Hybrid", "name_short": "Dynegy Moss Landing Power Plant", "owner": "Dynegy -Moss Landing LLC", "state": "california", "country": "usa", "lat": "36.806072", "long": "-121.782258", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.806072+-121.782258", "construction_time_month": 9, "construction_speed_mwh_per_month": 177, "no_of_battery_units": 0, "notes_split": ["TR1200 rack design with JH4 cell, 4500+ racks, two stages here ", " incident: septemter 2021 the first phase 1200 MWh was shut down after an overheating triggered the sprinkler system. "], "links": ["https://www.energy-storage.news/manufacturer-reveals-involvement-in-worlds-biggest-battery-energy-storage-system-so-far/", "https://insideevs.com/news/489894/vistra-moss-landing-energy-storage-world-largest/", "https://reneweconomy.com.au/worlds-biggest-battery-sidelined-after-overheating-incident-in-california/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chapel Farm", "city": "Luton", "id": "129", "external_id": "7058", "state": "bedfordshire", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Tag Energy", "developer": "Harmony Energy", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "51.925835", "long": "-0.49999903", "coords_hint": "0", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://twitter.com/Tesla_Megapack/status/1669479285848182784", "link3": "", "link4": ""}, "internal_id": "129", "external_id": "7058", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chapel Farm", "external_id": "7058", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy", "status": "planning", "date_first_heard": "2019-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.925834", "long": "-0.499999", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7058", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Chapel Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ ", "X-coordinate": "503243", "Y-coordinate": "226320", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/18/01795/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.925834", "long": "-0.499999", "status": "planning", "mw": 49, "ext_id": "7058"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "13/06/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7058", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Chapel Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ ", "X-coordinate": "503243", "Y-coordinate": "226320", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/18/01795/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.925834", "long": "-0.499999", "status": "planning", "mw": 49, "ext_id": "7058"}, "current_month": "2024-01", "dates": {"first_heard": "2019-06-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 99, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-01-18", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Chapel Farm", "name_short": "Chapel Farm", "owner": "Harmony Energy", "state": "eastern", "country": "uk", "lat": "51.925834", "long": "-0.499999", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.925834+-0.499999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article"], "links": ["https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "https://twitter.com/Tesla_Megapack/status/1669479285848182784"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Neptune Energy Center Hybrid", "city": "", "id": "204", "external_id": "63731", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "Neptune Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "204", "external_id": "63731", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Neptune Energy Center Hybrid", "external_id": "63731", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "Neptune Energy Center, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NT125": {"first": {"year": "2022", "month": "12", "entity id": "63427", "entity name": "Neptune Energy Center, LLC", "plant producer type": "IPP", "plant name": "Neptune Energy Center Hybrid", "plant state": "CO", "plant id": "63731", "generator id": "NT125", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63731", "date": "2022-12", "mw": 125}, "first_month": "2020-09", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "63427", "entity name": "Neptune Energy Center, LLC", "plant producer type": "IPP", "plant name": "Neptune Energy Center Hybrid", "plant state": "CO", "plant id": "63731", "generator id": "NT125", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63731", "date": "2023-06", "mw": 125}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-02"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "2023-06", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Neptune Energy Center Hybrid", "name_short": "Neptune Energy Center", "owner": "Neptune Energy Center, LLC", "state": "colorado", "country": "usa", "lat": "40.716268973433976", "long": "-102.689481504495", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.716268973433976+-102.689481504495", "construction_time_month": 16, "construction_speed_mwh_per_month": 15, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thunder Wolf Energy Center Hybrid", "city": "", "id": "205", "external_id": "63776", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Thunder Wolf Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "205", "external_id": "63776", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Thunder Wolf Energy Center Hybrid", "external_id": "63776", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Thunder Wolf Energy Center, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TW100": {"first": {"year": "2022", "month": "12", "entity id": "63454", "entity name": "Thunder Wolf Energy Center, LLC", "plant producer type": "IPP", "plant name": "Thunder Wolf Energy Center Hybrid", "plant state": "CO", "plant id": "63776", "generator id": "TW100", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63776", "date": "2022-12", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-12", "to": "2023-05", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "63454", "entity name": "Thunder Wolf Energy Center, LLC", "plant producer type": "IPP", "plant name": "Thunder Wolf Energy Center Hybrid", "plant state": "CO", "plant id": "63776", "generator id": "TW100", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63776", "date": "2023-06", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-02"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "2023-06", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Thunder Wolf Energy Center Hybrid", "name_short": "Thunder Wolf Energy Center", "owner": "Thunder Wolf Energy Center, LLC", "state": "colorado", "country": "usa", "lat": "40.742576", "long": "-102.716675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.742576+-102.716675", "construction_time_month": 16, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blue Jay Solar I, LLC", "city": "", "id": "241", "external_id": "64672", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "420", "power_mw": "210", "customer": "", "owner": "Blue Jay Solar I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "241", "external_id": "64672", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blue Jay Solar I, LLC", "external_id": "64672", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 420, "power_mw": 210, "owner": "Blue Jay Solar I, LLC", "status": "operation", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BLUJS": {"first": {"year": "2021", "month": "12", "entity id": "64266", "entity name": "Blue Jay Solar I, LLC", "plant producer type": "IPP", "plant name": "Blue Jay Solar I, LLC", "plant state": "TX", "plant id": "64672", "generator id": "BLUJS", "net summer capacity (mw)": "210", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64672", "date": "2021-12", "mw": 210}, "first_month": "2021-06", "changes": [{"month": "2021-07", "li": [{"name": "mw", "from": 210, "to": 50, "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "mw", "from": 50, "to": 210, "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "64266", "entity name": "Blue Jay Solar I, LLC", "plant producer type": "IPP", "plant name": "Blue Jay Solar I, LLC", "plant state": "TX", "plant id": "64672", "generator id": "BLUJS", "net summer capacity (mw)": "210", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64672", "date": "2023-06", "mw": 210}, "current_month": "2024-02", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 210, "mwh_is_estimate": true, "mwh": 420, "mwh_estimate": 420, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "2023-06", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Blue Jay Solar I, LLC", "name_short": "Blue Jay Solar I", "owner": "Blue Jay Solar I, LLC", "state": "texas", "country": "usa", "lat": "33.48557373342624", "long": "-95.17643023533789", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.48557373342624+-95.17643023533789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "High Lonesome Wind Power, LLC Hybrid", "city": "", "id": "253", "external_id": "62562", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "High Lonesome Wind Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "253", "external_id": "62562", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "High Lonesome Wind Power, LLC Hybrid", "external_id": "62562", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "High Lonesome Wind Power, LLC", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2022-01", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "5", "entity id": "62046", "entity name": "High Lonesome Wind Power, LLC", "plant producer type": "IPP", "plant name": "High Lonesome Wind Power, LLC Hybrid", "plant state": "TX", "plant id": "62562", "generator id": "BA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62562", "date": "2022-05", "mw": 50}, "first_month": "2021-06", "changes": [{"month": "2021-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-11", "to": "2023-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "62046", "entity name": "High Lonesome Wind Power, LLC", "plant producer type": "IPP", "plant name": "High Lonesome Wind Power, LLC Hybrid", "plant state": "TX", "plant id": "62562", "generator id": "BA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62562", "date": "2023-06", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2021-06", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2022-01", "start_operation": "2023-06", "start_estimated": "2022-07", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "High Lonesome Wind Power, LLC Hybrid", "name_short": "High Lonesome Wind Power", "owner": "High Lonesome Wind Power, LLC", "state": "texas", "country": "usa", "lat": "33.319757178933756", "long": "-95.37101035188054", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.319757178933756+-95.37101035188054", "construction_time_month": 17, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Feeder Road", "city": "", "id": "405", "external_id": "7663", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Thrive Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "405", "external_id": "7663", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Feeder Road", "external_id": "7663", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Thrive Renewables", "status": "operation", "date_first_heard": "2020-05-27", "start_construction": "2023-01-01", "start_operation": "2023-06-13", "start_estimated": "", "month_disappeared": "", "lat": "51.447495", "long": "-2.565063", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7663", "Record Last Updated (dd/mm/yyyy)": "21/05/2021", "Operator (or Applicant)": "Thrive Renewables", "Site Name": "Feeder Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Adjacent To St Philip's Marsh, Feeder Road, Land Off, Bristol, Avon", "County": "Avon", "Region": "South West", "Country": "England", "Post Code": "BS2 0TH", "X-coordinate": "360828", "Y-coordinate": "172208", "Planning Authority": "Bristol City Council", "Planning Application Reference": "19/04841/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/05/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.447495", "long": "-2.565063", "status": "planning", "mw": 20, "ext_id": "7663"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/05/2021", "to": "20/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/05/2022", "to": "13/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Finished", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Finished", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2023", "to": "01/05/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7663", "Record Last Updated (dd/mm/yyyy)": "01/05/2023", "Operator (or Applicant)": "Thrive Renewables", "Site Name": "Feeder Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Finished", "Development Status (short)": "Finished", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To St Philip's Marsh, Feeder Road, Land Off, Bristol, Avon", "County": "Avon", "Region": "South West", "Country": "England", "Post Code": "BS2 0TH", "X-coordinate": "360828", "Y-coordinate": "172208", "Planning Authority": "Bristol City Council", "Planning Application Reference": "19/04841/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/05/2023", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "51.447495", "long": "-2.565063", "status": "operation", "mw": 20, "ext_id": "7663"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-21", "start_construction": "", "start_operation": "2023-06-13"}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-05-27", "start_construction": "2023-01-01", "start_operation": "2023-06-13", "start_estimated": "", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Feeder Road", "name_short": "Feeder Road", "owner": "Thrive Renewables", "state": "south west", "country": "uk", "lat": "51.447495", "long": "-2.565063", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.447495+-2.565063", "construction_time_month": 5, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Andover Energy Storage Project", "city": "", "id": "779", "external_id": "65952", "state": "new jersey", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI 25 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "779", "external_id": "65952", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Andover Energy Storage Project", "external_id": "65952", "state": "new jersey", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "VESI 25 LLC", "status": "operation", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AD1": {"first": {"year": "2022", "month": "10", "entity id": "65128", "entity name": "VESI 25 LLC", "plant producer type": "IPP", "plant name": "Andover Energy Storage Project", "plant state": "NJ", "plant id": "65952", "generator id": "AD1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65952", "date": "2022-10", "mw": 20}, "first_month": "2022-09", "changes": [{"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2023-02", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "65128", "entity name": "VESI 25 LLC", "plant producer type": "IPP", "plant name": "Andover Energy Storage Project", "plant state": "NJ", "plant id": "65952", "generator id": "AD1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65952", "date": "2023-06", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "2023-06", "start_estimated": "2022-10", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Andover Energy Storage Project", "name_short": "Andover", "owner": "VESI 25 LLC", "state": "new jersey", "country": "usa", "lat": "39.80695125590127", "long": "-73.98608089749223", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:39.80695125590127+-73.98608089749223", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "CED West Side Canal Battery Storage", "city": "", "id": "854", "external_id": "65980", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "262", "power_mw": "131", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "854", "external_id": "65980", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "CED West Side Canal Battery Storage", "external_id": "65980", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 262, "power_mw": 131, "owner": "Consolidated Edison Development Inc.", "status": "operation", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WCBS": {"first": {"year": "2023", "month": "2", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "CED West Side Canal Battery Storage", "plant state": "CA", "plant id": "65980", "generator id": "WCBS", "net summer capacity (mw)": "131", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65980", "date": "2023-02", "mw": 131}, "first_month": "2022-11", "changes": [{"month": "2023-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "CED West Side Canal Battery Storage", "plant state": "CA", "plant id": "65980", "generator id": "WCBS", "net summer capacity (mw)": "131", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65980", "date": "2023-06", "mw": 131}, "current_month": "2024-02", "dates": {"first_heard": "2022-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 131, "mwh_is_estimate": true, "mwh": 262, "mwh_estimate": 262, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2023-06", "start_estimated": "2023-02", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "CED West Side Canal Battery Storage", "name_short": "CED West Side Canal", "owner": "Consolidated Edison Development Inc.", "state": "california", "country": "usa", "lat": "40.94387837493652", "long": "-121.3581441949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94387837493652+-121.3581441949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Buena Vista Energy Center", "city": "", "id": "974", "external_id": "66408", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Buena Vista Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "974", "external_id": "66408", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Buena Vista Energy Center", "external_id": "66408", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Buena Vista Energy Center, LLC", "status": "operation", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2023", "month": "6", "entity id": "65486", "entity name": "Buena Vista Energy Center, LLC", "plant producer type": "IPP", "plant name": "Buena Vista Energy Center", "plant state": "NM", "plant id": "66408", "generator id": "BESS1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66408", "date": "2023-06", "mw": 50}, "first_month": "2023-04", "changes": [{"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-07", "to": "2023-06", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "6", "entity id": "65486", "entity name": "Buena Vista Energy Center, LLC", "plant producer type": "IPP", "plant name": "Buena Vista Energy Center", "plant state": "NM", "plant id": "66408", "generator id": "BESS1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66408", "date": "2023-06", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2023-04", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2023-06", "start_estimated": "2023-06", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Buena Vista Energy Center", "name_short": "Buena Vista", "owner": "Buena Vista Energy Center, LLC", "state": "new mexico", "country": "usa", "lat": "36.233020114284706", "long": "-103.74843487471747", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.233020114284706+-103.74843487471747", "construction_time_month": -1, "construction_speed_mwh_per_month": -100, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upton County BESS", "city": "", "id": "1065", "external_id": "64811", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "24", "customer": "", "owner": "VESI Upton County BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1065", "external_id": "64811", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Upton County BESS", "external_id": "64811", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 48, "power_mw": 24, "owner": "VESI Upton County BESS, LLC", "status": "operation", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UPT1": {"first": {"year": "2023", "month": "6", "entity id": "64339", "entity name": "VESI Upton County BESS, LLC", "plant producer type": "IPP", "plant name": "Upton County BESS", "plant state": "TX", "plant id": "64811", "generator id": "UPT1", "net summer capacity (mw)": "24.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64811", "date": "2023-06", "mw": 24}, "first_month": "2023-08", "changes": [], "current": {"year": "2023", "month": "6", "entity id": "64339", "entity name": "VESI Upton County BESS, LLC", "plant producer type": "IPP", "plant name": "Upton County BESS", "plant state": "TX", "plant id": "64811", "generator id": "UPT1", "net summer capacity (mw)": "24.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64811", "date": "2023-06", "mw": 24}, "current_month": "2024-02", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 24, "mwh_is_estimate": true, "mwh": 48, "mwh_estimate": 48, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "2023-06", "start_estimated": "", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Upton County BESS", "name_short": "Upton County", "owner": "VESI Upton County BESS, LLC", "state": "texas", "country": "usa", "lat": "33.684053999999996", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.684053999999996+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dunsinane Industrial Estate", "city": "", "id": "398", "external_id": "7591", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "398", "external_id": "7591", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dunsinane Industrial Estate", "external_id": "7591", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "JLEN Environmental Assets Group", "status": "operation", "date_first_heard": "2020-03-27", "start_construction": "", "start_operation": "2023-05-03", "start_estimated": "", "month_disappeared": "", "lat": "56.480316", "long": "-3.012355", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7591", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Gigabox Developments", "Site Name": "Dunsinane Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To The W/O Kinnoull Stree, Dunsinane Avenue, Dunsinane Industrial Estate, Dundee, Tayside", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 3QT", "X-coordinate": "337745", "Y-coordinate": "732482", "Planning Authority": "Dundee City Council", "Planning Application Reference": "19/00876/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.480316", "long": "-3.012355", "status": "planning", "mw": 49, "ext_id": "7591"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "16/05/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Gigabox Developments", "to": "JLEN Environmental Assets Group", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "27/03/2023", "to": "08/12/2023", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "03/05/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7591", "Record Last Updated (dd/mm/yyyy)": "16/05/2023", "Operator (or Applicant)": "JLEN Environmental Assets Group", "Site Name": "Dunsinane Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The W/O Kinnoull Stree, Dunsinane Avenue, Dunsinane Industrial Estate, Dundee, Tayside", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 3QT", "X-coordinate": "337745", "Y-coordinate": "732482", "Planning Authority": "Dundee City Council", "Planning Application Reference": "19/00876/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/12/2023", "Under Construction": "", "Operational": "03/05/2023", "Heat Network Ref": "", "lat": "56.480316", "long": "-3.012355", "status": "operation", "mw": 49, "ext_id": "7591"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": "2023-05-16"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-03-27", "start_construction": "", "start_operation": "2023-05-03", "start_estimated": "", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Dunsinane Industrial Estate", "name_short": "Dunsinane Industrial Estate", "owner": "JLEN Environmental Assets Group", "state": "scotland", "country": "uk", "lat": "56.480316", "long": "-3.012355", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.480316+-3.012355", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "NY6 Battery", "city": "", "id": "714", "external_id": "65692", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "714", "external_id": "65692", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "NY6 Battery", "external_id": "65692", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-08", "start_construction": "", "start_operation": "2023-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NY6": {"first": {"year": "2022", "month": "11", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "NY6 Battery", "plant state": "NY", "plant id": "65692", "generator id": "NY6", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65692", "date": "2022-11", "mw": 20}, "first_month": "2022-08", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-02", "to": "2023-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "5", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "NY6 Battery", "plant state": "NY", "plant id": "65692", "generator id": "NY6", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65692", "date": "2023-05", "mw": 20}, "current_month": "2024-02", "dates": {"first_heard": "2022-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-08", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "NY6 Battery", "name_short": "NY6 Battery", "owner": "Key Capture Energy", "state": "new york", "country": "usa", "lat": "42.54929289624012", "long": "-75.5369138353925", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.54929289624012+-75.5369138353925", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sagebrush ESS", "city": "", "id": "776", "external_id": "65933", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Sagebrush ESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "776", "external_id": "65933", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sagebrush ESS", "external_id": "65933", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "Terra-Gen Operating Co-BESS 2", "status": "operation", "date_first_heard": "2022-09", "start_construction": "2022-11", "start_operation": "2023-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "1", "entity id": "65106", "entity name": "Sagebrush ESS, LLC", "plant producer type": "IPP", "plant name": "Sagebrush ESS", "plant state": "CA", "plant id": "65933", "generator id": "1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65933", "date": "2023-01", "mw": 80}, "first_month": "2022-09", "changes": [{"month": "2022-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "entity id", "from": "65106", "to": "64287", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Sagebrush ESS, LLC", "to": "Terra-Gen Operating Co-BESS", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-03", "to": "2023-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "entity id", "from": "64287", "to": "65552", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Terra-Gen Operating Co-BESS", "to": "Terra-Gen Operating Co-BESS 2", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "5", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush ESS", "plant state": "CA", "plant id": "65933", "generator id": "1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65933", "date": "2023-05", "mw": 80}, "current_month": "2024-02", "dates": {"first_heard": "2022-09", "start_construction": "2022-11"}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09", "start_construction": "2022-11", "start_operation": "2023-05", "start_estimated": "2023-01", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Sagebrush ESS", "name_short": "Sagebrush ESS", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "40.86398962756772", "long": "-121.21599637753002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.86398962756772+-121.21599637753002", "construction_time_month": 6, "construction_speed_mwh_per_month": 26, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bowling Green Energy Storage Project", "city": "", "id": "781", "external_id": "65951", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "VESI 21 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "781", "external_id": "65951", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bowling Green Energy Storage Project", "external_id": "65951", "state": "ohio", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "VESI 21 LLC", "status": "operation", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "2023-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BG1": {"first": {"year": "2022", "month": "10", "entity id": "65129", "entity name": "VESI 21 LLC", "plant producer type": "IPP", "plant name": "Bowling Green Energy Storage Project", "plant state": "OH", "plant id": "65951", "generator id": "BG1", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65951", "date": "2022-10", "mw": 12}, "first_month": "2022-09", "changes": [{"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2023-02", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-02", "to": "2023-01", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "5", "entity id": "65129", "entity name": "VESI 21 LLC", "plant producer type": "IPP", "plant name": "Bowling Green Energy Storage Project", "plant state": "OH", "plant id": "65951", "generator id": "BG1", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65951", "date": "2023-05", "mw": 12}, "current_month": "2024-02", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2022-10", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Bowling Green Energy Storage Project", "name_short": "Bowling Green", "owner": "VESI 21 LLC", "state": "ohio", "country": "usa", "lat": "41.44479209297624", "long": "-80.98205271403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.44479209297624+-80.98205271403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Farnham", "city": "Farnham", "id": "847", "external_id": "", "state": "surrey", "country": "uk", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.18894", "long": "-0.82903032", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "link3": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/", "link4": ""}, "internal_id": "847", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Farnham", "name_short": "Farnham", "owner": "Harmony Energy Income Trust", "state": "surrey", "country": "uk", "lat": "51.18894", "long": "-0.82903032", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.18894+-0.82903032", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "California Flats", "city": "monterey county", "id": "4", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "130", "customer": "Apple", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "85", "status": "operation", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.87009", "long": "-120.326403", "coords_hint": "1", "use_case": "130MW solar farm support", "notes": "used the release date of the youtube video as the operation start date", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "link2": "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "link3": "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "link4": "https://www.youtube.com/watch?v=SA3SdlKBtyc"}, "internal_id": "4", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 130, "mwh_is_estimate": false, "mwh": 240, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "California Flats", "name_short": "California Flats", "owner": "", "state": "california", "country": "usa", "lat": "35.87009", "long": "-120.326403", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.87009+-120.326403", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 85, "notes_split": ["used the release date of the youtube video as the operation start date"], "links": ["https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "https://www.youtube.com/watch?v=SA3SdlKBtyc"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Foothills Solar Plant Hybrid", "city": "", "id": "147", "external_id": "57997", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "76", "power_mw": "38", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "147", "external_id": "57997", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Foothills Solar Plant Hybrid", "external_id": "57997", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 76, "power_mw": 38, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FH38M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Foothills Solar Plant Hybrid", "plant state": "AZ", "plant id": "57997", "generator id": "FH38M", "net summer capacity (mw)": "38", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57997", "date": "2021-12", "mw": 38}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Foothills Solar Plant Hybrid", "plant state": "AZ", "plant id": "57997", "generator id": "FH38M", "net summer capacity (mw)": "38", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57997", "date": "2023-04", "mw": 38}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 38, "mwh_is_estimate": true, "mwh": 76, "mwh_estimate": 76, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Foothills Solar Plant Hybrid", "name_short": "Foothills Solar Plant", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.66773897668374", "long": "-110.02279574903645", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.66773897668374+-110.02279574903645", "construction_time_month": 6, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gila Bend Hybrid", "city": "", "id": "148", "external_id": "59020", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "148", "external_id": "59020", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gila Bend Hybrid", "external_id": "59020", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 72, "power_mw": 36, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GB36M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Gila Bend Hybrid", "plant state": "AZ", "plant id": "59020", "generator id": "GB36M", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "59020", "date": "2021-12", "mw": 36}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Gila Bend Hybrid", "plant state": "AZ", "plant id": "59020", "generator id": "GB36M", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59020", "date": "2023-04", "mw": 36}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 36, "mwh_is_estimate": true, "mwh": 72, "mwh_estimate": 72, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Gila Bend Hybrid", "name_short": "Gila Bend", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.62890202458687", "long": "-110.09236235056", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.62890202458687+-110.09236235056", "construction_time_month": 6, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cotton Center Solar Hybrid", "city": "", "id": "151", "external_id": "57561", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "151", "external_id": "57561", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cotton Center Solar Hybrid", "external_id": "57561", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 34, "power_mw": 17, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CC17M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Cotton Center Solar Hybrid", "plant state": "AZ", "plant id": "57561", "generator id": "CC17M", "net summer capacity (mw)": "17", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57561", "date": "2021-12", "mw": 17}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Cotton Center Solar Hybrid", "plant state": "AZ", "plant id": "57561", "generator id": "CC17M", "net summer capacity (mw)": "17", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57561", "date": "2023-04", "mw": 17}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 17, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Cotton Center Solar Hybrid", "name_short": "Cotton Center Solar", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.440728926686255", "long": "-110.00128289498801", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.440728926686255+-110.00128289498801", "construction_time_month": 6, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Paloma Solar Hybrid", "city": "", "id": "152", "external_id": "57562", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "152", "external_id": "57562", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Paloma Solar Hybrid", "external_id": "57562", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 34, "power_mw": 17, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PA17M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Paloma Solar Hybrid", "plant state": "AZ", "plant id": "57562", "generator id": "PA17M", "net summer capacity (mw)": "17", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57562", "date": "2021-12", "mw": 17}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Paloma Solar Hybrid", "plant state": "AZ", "plant id": "57562", "generator id": "PA17M", "net summer capacity (mw)": "17", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57562", "date": "2023-04", "mw": 17}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 17, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Paloma Solar Hybrid", "name_short": "Paloma Solar", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.39378792366988", "long": "-110.00175244719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.39378792366988+-110.00175244719", "construction_time_month": 6, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hyder Solar Hybrid", "city": "", "id": "153", "external_id": "57563", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "16", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "153", "external_id": "57563", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hyder Solar Hybrid", "external_id": "57563", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 32, "power_mw": 16, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"H116M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Hyder Solar Hybrid", "plant state": "AZ", "plant id": "57563", "generator id": "H116M", "net summer capacity (mw)": "16", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57563", "date": "2021-12", "mw": 16}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Hyder Solar Hybrid", "plant state": "AZ", "plant id": "57563", "generator id": "H116M", "net summer capacity (mw)": "16", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57563", "date": "2023-04", "mw": 16}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 16, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Hyder Solar Hybrid", "name_short": "Hyder Solar", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.344132178933755", "long": "-109.98282635188055", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.344132178933755+-109.98282635188055", "construction_time_month": 6, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hyder II Hybrid", "city": "", "id": "154", "external_id": "58383", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "154", "external_id": "58383", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hyder II Hybrid", "external_id": "58383", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 28, "power_mw": 14, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"H214M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Hyder II Hybrid", "plant state": "AZ", "plant id": "58383", "generator id": "H214M", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58383", "date": "2021-12", "mw": 14}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Hyder II Hybrid", "plant state": "AZ", "plant id": "58383", "generator id": "H214M", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "58383", "date": "2023-04", "mw": 14}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 14, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-04", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "Hyder II Hybrid", "name_short": "Hyder II", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.29963037493651", "long": "-109.9433491949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.29963037493651+-109.9433491949425", "construction_time_month": 6, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES Waikoloa Solar Hybrid", "city": "", "id": "213", "external_id": "63900", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "213", "external_id": "63900", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES Waikoloa Solar Hybrid", "external_id": "63900", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-08", "start_operation": "2023-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KLOAB": {"first": {"year": "2022", "month": "11", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Waikoloa Solar Hybrid", "plant state": "HI", "plant id": "63900", "generator id": "KLOAB", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63900", "date": "2022-11", "mw": 30}, "first_month": "2020-09", "changes": [{"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-11", "to": "2023-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "4", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Waikoloa Solar Hybrid", "plant state": "HI", "plant id": "63900", "generator id": "KLOAB", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63900", "date": "2023-04", "mw": 30}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-08"}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-08", "start_operation": "2023-04", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "AES Waikoloa Solar Hybrid", "name_short": "AES Waikoloa Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.542269538483755", "long": "-155.56408453169715", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.542269538483755+-155.56408453169715", "construction_time_month": 8, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fallbrook Energy Storage", "city": "", "id": "183", "external_id": "61365", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "183", "external_id": "61365", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Fallbrook Energy Storage", "external_id": "61365", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-02", "start_operation": "2023-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FBES": {"first": {"year": "2021", "month": "5", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Fallbrook Energy Storage", "plant state": "CA", "plant id": "61365", "generator id": "FBES", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61365", "date": "2021-05", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2021-05", "to": "2021-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-12", "to": "2022-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "3", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Fallbrook Energy Storage", "plant state": "CA", "plant id": "61365", "generator id": "FBES", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61365", "date": "2023-03", "mw": 40}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-02"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-02", "start_operation": "2023-03", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2023-03", "go_live_year_int": 2023, "name": "Fallbrook Energy Storage", "name_short": "Fallbrook", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.30551484072874", "long": "-121.1672095329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.30551484072874+-121.1672095329819", "construction_time_month": 25, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Madero Grid", "city": "", "id": "244", "external_id": "63757", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Madero Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "244", "external_id": "63757", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Madero Grid", "external_id": "63757", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Madero Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-05", "start_operation": "2023-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MAD01": {"first": {"year": "2021", "month": "7", "entity id": "63451", "entity name": "Madero Grid, LLC", "plant producer type": "IPP", "plant name": "Madero Grid", "plant state": "TX", "plant id": "63757", "generator id": "MAD01", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63757", "date": "2021-07", "mw": 200}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "date", "from": "2021-07", "to": "2021-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2020-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-01", "li": [{"name": "mw", "from": 200, "to": 100, "extra": "", "change_type": "misc"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2022-01", "to": "2022-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2022-06", "to": "2022-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "3", "entity id": "63451", "entity name": "Madero Grid, LLC", "plant producer type": "IPP", "plant name": "Madero Grid", "plant state": "TX", "plant id": "63757", "generator id": "MAD01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63757", "date": "2023-03", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-05"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-05", "start_operation": "2023-03", "start_estimated": "2022-04", "month_disappeared": "", "go_live": "2023-03", "go_live_year_int": 2023, "name": "Madero Grid", "name_short": "Madero Grid", "owner": "Madero Grid, LLC", "state": "texas", "country": "usa", "lat": "33.61383149473758", "long": "-95.22152314494501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.61383149473758+-95.22152314494501", "construction_time_month": 22, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ignacio Grid Energy Storage System", "city": "", "id": "247", "external_id": "64089", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Ignacio Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "247", "external_id": "64089", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ignacio Grid Energy Storage System", "external_id": "64089", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Ignacio Grid, LLC", "status": "operation", "date_first_heard": "2020-11", "start_construction": "2021-06", "start_operation": "2023-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"IGN01": {"first": {"year": "2021", "month": "6", "entity id": "63723", "entity name": "Ignacio Grid, LLC", "plant producer type": "IPP", "plant name": "Ignacio Grid Energy Storage System", "plant state": "TX", "plant id": "64089", "generator id": "IGN01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64089", "date": "2021-06", "mw": 100}, "first_month": "2020-11", "changes": [{"month": "2021-01", "li": [{"name": "date", "from": "2021-06", "to": "2022-01", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2022-03", "to": "2022-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "3", "entity id": "63723", "entity name": "Ignacio Grid, LLC", "plant producer type": "IPP", "plant name": "Ignacio Grid Energy Storage System", "plant state": "TX", "plant id": "64089", "generator id": "IGN01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64089", "date": "2023-03", "mw": 100}, "current_month": "2024-02", "dates": {"first_heard": "2020-11", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-11", "start_construction": "2021-06", "start_operation": "2023-03", "start_estimated": "2022-05", "month_disappeared": "", "go_live": "2023-03", "go_live_year_int": 2023, "name": "Ignacio Grid Energy Storage System", "name_short": "Ignacio Grid", "owner": "Ignacio Grid, LLC", "state": "texas", "country": "usa", "lat": "33.64336397668374", "long": "-95.41097974903644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.64336397668374+-95.41097974903644", "construction_time_month": 21, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Camp Lejeune Solar and Energy Storage", "city": "", "id": "858", "external_id": "59966", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Duke Energy Progress - (NC)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "858", "external_id": "59966", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Camp Lejeune Solar and Energy Storage", "external_id": "59966", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "Duke Energy Progress - (NC)", "status": "operation", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2023-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ES1": {"first": {"year": "2023", "month": "3", "entity id": "3046", "entity name": "Duke Energy Progress - (NC)", "plant producer type": "Electric Utility", "plant name": "Camp Lejeune Solar and Energy Storage", "plant state": "NC", "plant id": "59966", "generator id": "ES1", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "59966", "date": "2023-03", "mw": 11}, "first_month": "2022-11", "changes": [{"month": "2022-12", "li": [{"name": "energy source code", "from": "", "to": "MWH", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-04", "to": "2023-03", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2023", "month": "3", "entity id": "3046", "entity name": "Duke Energy Progress - (NC)", "plant producer type": "Electric Utility", "plant name": "Camp Lejeune Solar and Energy Storage", "plant state": "NC", "plant id": "59966", "generator id": "ES1", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59966", "date": "2023-03", "mw": 11}, "current_month": "2024-02", "dates": {"first_heard": "2022-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2023-03", "start_estimated": "2023-04", "month_disappeared": "", "go_live": "2023-03", "go_live_year_int": 2023, "name": "Camp Lejeune Solar and Energy Storage", "name_short": "Camp Lejeune Solar", "owner": "Duke Energy Progress - (NC)", "state": "north carolina", "country": "usa", "lat": "36.16381327036728", "long": "-76.6535423095525", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.16381327036728+-76.6535423095525", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "El Sol BESS", "city": "", "id": "146", "external_id": "62964", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "146", "external_id": "62964", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "El Sol BESS", "external_id": "62964", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"EL50M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "El Sol BESS", "plant state": "AZ", "plant id": "62964", "generator id": "EL50M", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62964", "date": "2021-12", "mw": 50}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-12", "to": "2022-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "2", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "El Sol BESS", "plant state": "AZ", "plant id": "62964", "generator id": "EL50M", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62964", "date": "2023-02", "mw": 50}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "2023-02", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "El Sol BESS", "name_short": "El Sol", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.68005298145457", "long": "-109.9507656028075", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.68005298145457+-109.9507656028075", "construction_time_month": 4, "construction_speed_mwh_per_month": 25, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Star Hybrid", "city": "", "id": "156", "external_id": "59444", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "156", "external_id": "59444", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Star Hybrid", "external_id": "59444", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Arizona Public Service Co", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2022-03", "start_operation": "2023-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DS10M": {"first": {"year": "2021", "month": "12", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Desert Star Hybrid", "plant state": "AZ", "plant id": "59444", "generator id": "DS10M", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "59444", "date": "2021-12", "mw": 10}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "date", "from": "2021-12", "to": "2022-06", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "2", "entity id": "803", "entity name": "Arizona Public Service Co", "plant producer type": "Electric Utility", "plant name": "Desert Star Hybrid", "plant state": "AZ", "plant id": "59444", "generator id": "DS10M", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59444", "date": "2023-02", "mw": 10}, "current_month": "2024-02", "dates": {"first_heard": "2021-04", "start_construction": "2022-03"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2022-03", "start_operation": "2023-02", "start_estimated": "2022-06", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "Desert Star Hybrid", "name_short": "Desert Star", "owner": "Arizona Public Service Co", "state": "arizona", "country": "usa", "lat": "36.25778388821952", "long": "-109.81356205730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.25778388821952+-109.81356205730502", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lake Placid Solar Power Plant", "city": "", "id": "555", "external_id": "62541", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Duke Energy Florida, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "555", "external_id": "62541", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lake Placid Solar Power Plant", "external_id": "62541", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 34, "power_mw": 17, "owner": "Duke Energy Florida, LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2023-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ES1": {"first": {"year": "2021", "month": "12", "entity id": "6455", "entity name": "Duke Energy Florida, LLC", "plant producer type": "Electric Utility", "plant name": "Lake Placid Solar Power Plant", "plant state": "FL", "plant id": "62541", "generator id": "ES1", "net summer capacity (mw)": "17.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "62541", "date": "2021-12", "mw": 17}, "first_month": "2021-11", "changes": [{"month": "2021-12", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "2", "entity id": "6455", "entity name": "Duke Energy Florida, LLC", "plant producer type": "Electric Utility", "plant name": "Lake Placid Solar Power Plant", "plant state": "FL", "plant id": "62541", "generator id": "ES1", "net summer capacity (mw)": "17.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62541", "date": "2023-02", "mw": 17}, "current_month": "2024-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 17, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2023-02", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "Lake Placid Solar Power Plant", "name_short": "Lake Placid Solar", "owner": "Duke Energy Florida, LLC", "state": "florida", "country": "usa", "lat": "29.921984", "long": "-82.147522", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:29.921984+-82.147522", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jurong Island", "city": "", "id": "867", "external_id": "", "state": "", "country": "singapore", "capacity_mwh": "285", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "", "developer": "sembcorp", "manufacturer": "huawei", "type": "", "cells": "lfp", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-02-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "1.266316", "long": "103.703028", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/southeast-asias-biggest-battery-storage-project-officially-opened-in-singapore/", "link2": "", "link3": "", "link4": ""}, "internal_id": "867", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 200, "mwh_is_estimate": false, "mwh": 285, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2023-02-02", "start_estimated": "", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "Jurong Island", "name_short": "Jurong Island", "owner": "", "state": "", "country": "singapore", "lat": "1.266316", "long": "103.703028", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:1.266316+103.703028", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/southeast-asias-biggest-battery-storage-project-officially-opened-in-singapore/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "city": "", "id": "905", "external_id": "12725", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Zenobe Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-02-01", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "905", "external_id": "12725", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "external_id": "12725", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Zenobe Energy Limited", "status": "operation", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "2023-02-14", "start_estimated": "", "month_disappeared": "", "lat": "53.256874", "long": "-2.95341", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12725", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Zenobe Energy Limited", "Site Name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH1 6HE", "X-coordinate": "336493", "Y-coordinate": "373743", "Planning Authority": "Cheshire West & Chester Council", "Planning Application Reference": "20/03681/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/02/2024", "Under Construction": "01/06/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.256874", "long": "-2.95341", "status": "construction", "mw": 100, "ext_id": "12725"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/11/2022", "to": "14/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "01/02/2024", "to": "01/06/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/06/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "11/02/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Cheshire West & Chester Council", "to": "Cheshire West and Chester Council", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "11/02/2023", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12725", "Record Last Updated (dd/mm/yyyy)": "14/02/2023", "Operator (or Applicant)": "Zenobe Energy Limited", "Site Name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH1 6HE", "X-coordinate": "336493", "Y-coordinate": "373743", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "20/03681/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/06/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.256874", "long": "-2.95341", "status": "operation", "mw": 100, "ext_id": "12725"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-28", "start_construction": "", "start_operation": "2023-02-14"}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02-01", "start_construction": "2021-06-01", "start_operation": "2023-02-14", "start_estimated": "", "month_disappeared": "", "go_live": "2023-02", "go_live_year_int": 2023, "name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "name_short": "National Grid Electricity Substatio...", "owner": "Zenobe Energy Limited", "state": "north west", "country": "uk", "lat": "53.256874", "long": "-2.95341", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.256874+-2.95341", "construction_time_month": 20, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Waiawa Solar Power Hybrid", "city": "", "id": "557", "external_id": "65058", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Waiawa Solar Power LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "557", "external_id": "65058", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Waiawa Solar Power Hybrid", "external_id": "65058", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 72, "power_mw": 36, "owner": "Waiawa Solar Power LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "2022-01", "start_operation": "2023-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WAIBA": {"first": {"year": "2022", "month": "9", "entity id": "64474", "entity name": "Waiawa Solar Power LLC", "plant producer type": "IPP", "plant name": "Waiawa Solar Power Hybrid", "plant state": "HI", "plant id": "65058", "generator id": "WAIBA", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65058", "date": "2022-09", "mw": 36}, "first_month": "2021-11", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2022-12", "to": "2023-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "1", "entity id": "64474", "entity name": "Waiawa Solar Power LLC", "plant producer type": "IPP", "plant name": "Waiawa Solar Power Hybrid", "plant state": "HI", "plant id": "65058", "generator id": "WAIBA", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65058", "date": "2023-01", "mw": 36}, "current_month": "2024-02", "dates": {"first_heard": "2021-11", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 36, "mwh_is_estimate": true, "mwh": 72, "mwh_estimate": 72, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "2022-01", "start_operation": "2023-01", "start_estimated": "2022-09", "month_disappeared": "", "go_live": "2023-01", "go_live_year_int": 2023, "name": "Waiawa Solar Power Hybrid", "name_short": "Waiawa Solar Power", "owner": "Waiawa Solar Power LLC", "state": "hawaii", "country": "usa", "lat": "19.406354683428763", "long": "-155.3642375459177", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.406354683428763+-155.3642375459177", "construction_time_month": 12, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Farm Solar Park", "city": "", "id": "502", "external_id": "9361", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Voltalia UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-11-15", "start_construction": "2021-01-07", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "502", "external_id": "9361", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Farm Solar Park", "external_id": "9361", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Voltalia UK", "status": "operation", "date_first_heard": "2019-11-15", "start_construction": "2021-01-07", "start_operation": "2022-12-21", "start_estimated": "", "month_disappeared": "", "lat": "50.813188", "long": "-2.141475", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9361", "Record Last Updated (dd/mm/yyyy)": "28/07/2021", "Operator (or Applicant)": "Voltalia UK", "Site Name": "South Farm Solar Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9360", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "South Farm, Field Dairy To Louse Lane, Spetisbury, Blandford Forum", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT11 9DY", "X-coordinate": "390129", "Y-coordinate": "101525", "Planning Authority": "North Dorset District Council", "Planning Application Reference": "2/2019/0850/PAEIA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "07/01/2021", "Operational": "", "Heat Network Ref": "", "lat": "50.813188", "long": "-2.141475", "status": "construction", "mw": 10, "ext_id": "9361"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/07/2021", "to": "21/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "16/12/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Operational", "from": "16/12/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9361", "Record Last Updated (dd/mm/yyyy)": "21/12/2022", "Operator (or Applicant)": "Voltalia UK", "Site Name": "South Farm Solar Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9360", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Farm, Field Dairy To Louse Lane, Spetisbury, Blandford Forum", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT11 9DY", "X-coordinate": "390129", "Y-coordinate": "101525", "Planning Authority": "North Dorset District Council", "Planning Application Reference": "2/2019/0850/PAEIA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "07/01/2021", "Operational": "", "Heat Network Ref": "", "lat": "50.813188", "long": "-2.141475", "status": "operation", "mw": 10, "ext_id": "9361"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-28", "start_construction": "", "start_operation": "2022-12-21"}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-11-15", "start_construction": "2021-01-07", "start_operation": "2022-12-21", "start_estimated": "", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "South Farm Solar Park", "name_short": "South Farm Solar Park", "owner": "Voltalia UK", "state": "south west", "country": "uk", "lat": "50.813188", "long": "-2.141475", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.813188+-2.141475", "construction_time_month": 23, "construction_speed_mwh_per_month": 0, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blythe Mesa Solar II", "city": "", "id": "548", "external_id": "65053", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Blythe Mesa Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "548", "external_id": "65053", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blythe Mesa Solar II", "external_id": "65053", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 224, "power_mw": 112, "owner": "Blythe Mesa Solar II, LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "2022-01", "start_operation": "2022-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BMSES": {"first": {"year": "2022", "month": "11", "entity id": "64459", "entity name": "Blythe Mesa Solar II, LLC", "plant producer type": "IPP", "plant name": "Blythe Mesa Solar II", "plant state": "CA", "plant id": "65053", "generator id": "BMSES", "net summer capacity (mw)": "112", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65053", "date": "2022-11", "mw": 112}, "first_month": "2021-11", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "12", "entity id": "64459", "entity name": "Blythe Mesa Solar II, LLC", "plant producer type": "IPP", "plant name": "Blythe Mesa Solar II", "plant state": "CA", "plant id": "65053", "generator id": "BMSES", "net summer capacity (mw)": "112", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65053", "date": "2022-12", "mw": 112}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 112, "mwh_is_estimate": true, "mwh": 224, "mwh_estimate": 224, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "2022-01", "start_operation": "2022-12", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Blythe Mesa Solar II", "name_short": "Blythe Mesa Solar II", "owner": "Blythe Mesa Solar II, LLC", "state": "california", "country": "usa", "lat": "41.273150024586876", "long": "-121.50715735055999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.273150024586876+-121.50715735055999", "construction_time_month": 11, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BigBeau Solar, LLC", "city": "", "id": "550", "external_id": "64993", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Big Beau Solar, LLC ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "550", "external_id": "64993", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "BigBeau Solar, LLC", "external_id": "64993", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Big Beau Solar, LLC ", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BB1BA": {"first": {"year": "2022", "month": "4", "entity id": "64424", "entity name": "Big Beau Solar, LLC ", "plant producer type": "IPP", "plant name": "BigBeau Solar, LLC", "plant state": "CA", "plant id": "64993", "generator id": "BB1BA", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64993", "date": "2022-04", "mw": 40}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "12", "entity id": "64424", "entity name": "Big Beau Solar, LLC ", "plant producer type": "IPP", "plant name": "BigBeau Solar, LLC", "plant state": "CA", "plant id": "64993", "generator id": "BB1BA", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64993", "date": "2022-12", "mw": 40}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-12", "start_estimated": "2022-04", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "BigBeau Solar, LLC", "name_short": "BigBeau Solar", "owner": "Big Beau Solar, LLC ", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.400049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.400049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX23 Roughneck Storage", "city": "", "id": "722", "external_id": "65701", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "722", "external_id": "65701", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX23 Roughneck Storage", "external_id": "65701", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX23": {"first": {"year": "2022", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX23 Roughneck Storage", "plant state": "TX", "plant id": "65701", "generator id": "TX23", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65701", "date": "2022-07", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX23 Roughneck Storage", "plant state": "TX", "plant id": "65701", "generator id": "TX23", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65701", "date": "2022-12", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-12", "start_estimated": "2022-07", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "TX23 Roughneck Storage", "name_short": "TX23 Roughneck", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.503427961192564", "long": "-95.20548057247251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.503427961192564+-95.20548057247251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX13 Endurance Park Storage", "city": "", "id": "723", "external_id": "65696", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "723", "external_id": "65696", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX13 Endurance Park Storage", "external_id": "65696", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX13": {"first": {"year": "2022", "month": "11", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX13 Endurance Park Storage", "plant state": "TX", "plant id": "65696", "generator id": "TX13", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65696", "date": "2022-11", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX13 Endurance Park Storage", "plant state": "TX", "plant id": "65696", "generator id": "TX13", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65696", "date": "2022-12", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-12", "start_estimated": "2022-11", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "TX13 Endurance Park Storage", "name_short": "TX13 Endurance Park", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.53980980140374", "long": "-95.211132763257", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.53980980140374+-95.211132763257", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lessines", "city": "", "id": "843", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "Corsica Sole", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "cost_million": "33", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "50.72743", "long": "3.854307", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://insideevs.com/news/625965/tesla-megapack-battery-belgium/", "link2": "", "link3": "", "link4": ""}, "internal_id": "843", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Lessines", "name_short": "Lessines", "owner": "", "state": "", "country": "belgium", "lat": "50.72743", "long": "3.854307", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.72743+3.854307", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://insideevs.com/news/625965/tesla-megapack-battery-belgium/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Broadditch", "city": "Southfleet", "id": "845", "external_id": "", "state": "kent", "country": "uk", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.41493", "long": "0.32622", "coords_hint": "1", "use_case": "", "notes": "uses the megapack xl", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf", "link3": "", "link4": ""}, "internal_id": "845", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 11, "mwh_is_estimate": false, "mwh": 22, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Broadditch", "name_short": "Broadditch", "owner": "Harmony Energy Income Trust", "state": "kent", "country": "uk", "lat": "51.41493", "long": "0.32622", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.41493+0.32622", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 6, "notes_split": ["uses the megapack xl"], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Taos Mesa Energy Facility Hybrid", "city": "", "id": "226", "external_id": "63728", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Taos Mesa Energy Facility, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "226", "external_id": "63728", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Taos Mesa Energy Facility Hybrid", "external_id": "63728", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Taos Mesa Energy Facility, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2022-05", "start_operation": "2022-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2021", "month": "9", "entity id": "63420", "entity name": "Taos Mesa Energy Facility, LLC", "plant producer type": "IPP", "plant name": "Taos Mesa Energy Facility Hybrid", "plant state": "NM", "plant id": "63728", "generator id": "BESS", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63728", "date": "2021-09", "mw": 12}, "first_month": "2020-09", "changes": [{"month": "2021-07", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2023-03", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2023-03", "to": "2022-05", "extra": "accelerated by 10 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "plant producer type", "from": "IPP", "to": "Electric Utility", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "11", "entity id": "63420", "entity name": "Taos Mesa Energy Facility, LLC", "plant producer type": "Electric Utility", "plant name": "Taos Mesa Energy Facility Hybrid", "plant state": "NM", "plant id": "63728", "generator id": "BESS", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63728", "date": "2022-11", "mw": 12}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2022-05"}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2022-05", "start_operation": "2022-11", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Taos Mesa Energy Facility Hybrid", "name_short": "Taos Mesa Energy Facility", "owner": "Taos Mesa Energy Facility, LLC", "state": "new mexico", "country": "usa", "lat": "36.613442720802766", "long": "-103.73112992303248", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.613442720802766+-103.73112992303248", "construction_time_month": 6, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Melksham Substation East Storage", "city": "", "id": "287", "external_id": "6953", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy / Melksham East Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "287", "external_id": "6953", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Melksham Substation East Storage", "external_id": "6953", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Statera Energy / Melksham East Storage", "status": "operation", "date_first_heard": "2017-09-28", "start_construction": "2022-01-01", "start_operation": "2022-11-07", "start_estimated": "", "month_disappeared": "", "lat": "51.399186", "long": "-2.153916", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6953", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy / Melksham East Storage", "Site Name": "Melksham Substation East Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land to the south of Melksham Substation Westlands Farm Westlands Lane Whitley Melksham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN12 7QG", "X-coordinate": "389389", "Y-coordinate": "166695", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "17/04110/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.399186", "long": "-2.153916", "status": "planning", "mw": 50, "ext_id": "6953"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2020", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "22/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "07/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "22/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6953", "Record Last Updated (dd/mm/yyyy)": "22/11/2022", "Operator (or Applicant)": "Statera Energy / Melksham East Storage", "Site Name": "Melksham Substation East Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south of Melksham Substation Westlands Farm Westlands Lane Whitley Melksham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN12 7QG", "X-coordinate": "389389", "Y-coordinate": "166695", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "17/04110/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2020", "Under Construction": "01/01/2022", "Operational": "07/11/2022", "Heat Network Ref": "", "lat": "51.399186", "long": "-2.153916", "status": "operation", "mw": 50, "ext_id": "6953"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "2020-08-21", "start_operation": "2022-11-22"}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-09-28", "start_construction": "2022-01-01", "start_operation": "2022-11-07", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Melksham Substation East Storage", "name_short": "Melksham Substation East", "owner": "Statera Energy / Melksham East Storage", "state": "south west", "country": "uk", "lat": "51.399186", "long": "-2.153916", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.399186+-2.153916", "construction_time_month": 10, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pillswood Phase 1", "city": "Cottingham", "id": "299", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": ""}, "internal_id": "299", "external_id": "7005", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pillswood Phase 1 ", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.801332", "long": "-0.415133", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7005", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Creyke Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504478", "Y-coordinate": "435057", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01993/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.801332", "long": "-0.415133", "status": "planning", "mw": 49, "ext_id": "7005"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "7360", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/11/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2019", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Creyke Substation", "to": "Pillswood Phase 1 ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Revised", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Revised", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "7360", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7005", "Record Last Updated (dd/mm/yyyy)": "09/11/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Pillswood Phase 1 ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504478", "Y-coordinate": "435057", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01993/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2020", "Under Construction": "01/04/2022", "Operational": "01/11/2022", "Heat Network Ref": "", "lat": "53.801332", "long": "-0.415133", "status": "operation", "mw": 49, "ext_id": "7005"}, "current_month": "2024-01", "dates": {"first_heard": "2019-06-13", "start_construction": "", "start_operation": "2022-11-09"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-11-17", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Pillswood Phase 1 ", "name_short": "Pillswood Phase 1 ", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.801332", "long": "-0.415133", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.801332+-0.415133", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 39, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Byrd Ranch Storage", "city": "", "id": "579", "external_id": "65259", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Byrd Ranch Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "579", "external_id": "65259", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Byrd Ranch Storage", "external_id": "65259", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Byrd Ranch Storage LLC", "status": "operation", "date_first_heard": "2022-02", "start_construction": "2022-03", "start_operation": "2022-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"P1": {"first": {"year": "2022", "month": "8", "entity id": "64564", "entity name": "Byrd Ranch Storage LLC", "plant producer type": "IPP", "plant name": "Byrd Ranch Storage", "plant state": "TX", "plant id": "65259", "generator id": "P1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65259", "date": "2022-08", "mw": 50}, "first_month": "2022-02", "changes": [{"month": "2022-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "11", "entity id": "64564", "entity name": "Byrd Ranch Storage LLC", "plant producer type": "IPP", "plant name": "Byrd Ranch Storage", "plant state": "TX", "plant id": "65259", "generator id": "P1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65259", "date": "2022-11", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2022-02", "start_construction": "2022-03"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-02", "start_construction": "2022-03", "start_operation": "2022-11", "start_estimated": "2022-08", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Byrd Ranch Storage", "name_short": "Byrd Ranch", "owner": "Byrd Ranch Storage LLC", "state": "texas", "country": "usa", "lat": "33.349606255901264", "long": "-94.95198089749223", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.349606255901264+-94.95198089749223", "construction_time_month": 8, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Danville BESS 1", "city": "", "id": "690", "external_id": "65499", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Doc Brown LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "690", "external_id": "65499", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Danville BESS 1", "external_id": "65499", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Doc Brown LLC", "status": "operation", "date_first_heard": "2022-04", "start_construction": "", "start_operation": "2022-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"90909": {"first": {"year": "2022", "month": "6", "entity id": "64809", "entity name": "Doc Brown LLC", "plant producer type": "IPP", "plant name": "Danville BESS 1", "plant state": "VA", "plant id": "65499", "generator id": "90909", "net summer capacity (mw)": "10.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65499", "date": "2022-06", "mw": 10}, "first_month": "2022-04", "changes": [{"month": "2022-06", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-07", "to": "2022-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "11", "entity id": "64809", "entity name": "Doc Brown LLC", "plant producer type": "IPP", "plant name": "Danville BESS 1", "plant state": "VA", "plant id": "65499", "generator id": "90909", "net summer capacity (mw)": "10.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65499", "date": "2022-11", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2022-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-04", "start_construction": "", "start_operation": "2022-11", "start_estimated": "2022-06", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Danville BESS 1", "name_short": "Danville BESS 1", "owner": "Doc Brown LLC", "state": "virginia", "country": "usa", "lat": "38.160223", "long": "-77.98875000000001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.160223+-77.98875000000001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elsteraue Battery Storage", "city": "", "id": "842", "external_id": "SEE932907515472", "state": "saxony-anhalt", "country": "germany", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "842", "external_id": "SEE932907515472", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Elsteraue Battery Storage", "external_id": "SEE932907515472", "state": "saxony-anhalt", "country": "germany", "mwh": 16, "estimate_mwh": "", "power_mw": 13, "owner": "Obton Storage GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-18", "start_estimated": "", "month_disappeared": "", "lat": "51.074722", "long": "12.197500", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5429476"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE932907515472", "DatumLetzteAktualisierung": "2022-11-29T09:54:33.6669074", "LokationMaStRNummer": "SEL987631756653", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-29", "AnlagenbetreiberMastrNummer": "ABR948334917826", "Land": "84", "Bundesland": "1414", "Landkreis": "Burgenlandkreis", "Gemeinde": "Elsteraue", "Gemeindeschluessel": "15084130", "Postleitzahl": "06729", "Strasse": "Hauptstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Adresszusatz": "Hauptstra\u00dfe", "Ort": "Elsteraue", "Laengengrad": "12.197500", "Breitengrad": "51.074722", "Registrierungsdatum": "2022-11-29", "Inbetriebnahmedatum": "2022-11-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Elsteraue Battery Storage", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE900249956468", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13800.000", "SpeMastrNummer": "SSE913613213043", "EegMaStRNummer": "EEG982859885529", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5429476", "owner": "Obton Storage GmbH \uff06 Co. KG", "mwh": 16, "ext_id": "SEE932907515472", "mw": 13, "status": "operation"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE932907515472", "DatumLetzteAktualisierung": "2022-11-29T09:54:33.6669074", "LokationMaStRNummer": "SEL987631756653", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-29", "AnlagenbetreiberMastrNummer": "ABR948334917826", "Land": "84", "Bundesland": "1414", "Landkreis": "Burgenlandkreis", "Gemeinde": "Elsteraue", "Gemeindeschluessel": "15084130", "Postleitzahl": "06729", "Strasse": "Hauptstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Adresszusatz": "Hauptstra\u00dfe", "Ort": "Elsteraue", "Laengengrad": "12.197500", "Breitengrad": "51.074722", "Registrierungsdatum": "2022-11-29", "Inbetriebnahmedatum": "2022-11-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Elsteraue Battery Storage", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE900249956468", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13800.000", "SpeMastrNummer": "SSE913613213043", "EegMaStRNummer": "EEG982859885529", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5429476", "owner": "Obton Storage GmbH \uff06 Co. KG", "mwh": 16, "ext_id": "SEE932907515472", "mw": 13, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-11-18", "start_estimated": ""}}, "mw": 13, "mwh_is_estimate": false, "mwh": 16, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-18", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Elsteraue Battery Storage", "name_short": "Elsteraue", "owner": "Obton Storage GmbH \uff06 Co. KG", "state": "saxony-anhalt", "country": "germany", "lat": "51.074722", "long": "12.197500", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.074722+12.197500", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5429476"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pillswood Phase 2", "city": "Cottingham", "id": "846", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Tesla", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": "https://twitter.com/Tesla_Megapack/status/1661649261757612032"}, "internal_id": "846", "external_id": "7360", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pillswood Phase 2", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "operation", "date_first_heard": "2019-11-14", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.802281", "long": "-0.416949", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7360", "Record Last Updated (dd/mm/yyyy)": "31/01/2020", "Operator (or Applicant)": "Northern Powergrid", "Site Name": "Creyke Beck Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504356", "Y-coordinate": "435160", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "19/01449/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.802281", "long": "-0.416949", "status": "planning", "mw": 49, "ext_id": "7360"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7005", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2020", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Northern Powergrid", "to": "Harmony Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Creyke Beck Substation", "to": "Pillswood Phase 2", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "7005", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7360", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Pillswood Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504356", "Y-coordinate": "435160", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "19/01449/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2022", "Under Construction": "01/04/2022", "Operational": "01/11/2022", "Heat Network Ref": "", "lat": "53.802281", "long": "-0.416949", "status": "operation", "mw": 49, "ext_id": "7360"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-31", "start_construction": "", "start_operation": "2022-11-09"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-11-14", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Pillswood Phase 2", "name_short": "Pillswood Phase 2", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.802281", "long": "-0.416949", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.802281+-0.416949", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 39, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "https://twitter.com/Tesla_Megapack/status/1661649261757612032"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Orangeville Storage", "city": "", "id": "236", "external_id": "64686", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "236", "external_id": "64686", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Orangeville Storage", "external_id": "64686", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 48, "power_mw": 24, "owner": "Invenergy Services LLC", "status": "operation", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"65002": {"first": {"year": "2021", "month": "8", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Orangeville Storage", "plant state": "NY", "plant id": "64686", "generator id": "65002", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64686", "date": "2021-08", "mw": 20}, "first_month": "2021-07", "changes": [{"month": "2021-09", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}, {"name": "mw", "from": 20, "to": 24, "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-10", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Orangeville Storage", "plant state": "NY", "plant id": "64686", "generator id": "65002", "net summer capacity (mw)": "24.7", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64686", "date": "2022-10", "mw": 24}, "current_month": "2023-02", "dates": {"first_heard": "2021-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 24, "mwh_is_estimate": true, "mwh": 48, "mwh_estimate": 48, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Orangeville Storage", "name_short": "Orangeville", "owner": "Invenergy Services LLC", "state": "new york", "country": "usa", "lat": "42.46940414887133", "long": "-75.44420873708002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.46940414887133+-75.44420873708002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ray Battery Storage Facility", "city": "", "id": "283", "external_id": "6943", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Vattenfall Wind Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "283", "external_id": "6943", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ray Battery Storage Facility", "external_id": "6943", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Vattenfall Wind Power", "status": "operation", "date_first_heard": "2017-07-25", "start_construction": "2022-07-01", "start_operation": "2022-10-01", "start_estimated": "", "month_disappeared": "", "lat": "55.165618", "long": "-2.078", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6943", "Record Last Updated (dd/mm/yyyy)": "21/09/2020", "Operator (or Applicant)": "Vattenfall Wind Power", "Site Name": "Ray Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4026", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne, Northumberland", "County": "Northumberland", "Region": "North East", "Country": "England", "Post Code": "NE19 2RG", "X-coordinate": "395129", "Y-coordinate": "585703", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "17/01923/RENE", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/07/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.165618", "long": "-2.078", "status": "planning", "mw": 20, "ext_id": "6943"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne, Northumberland", "to": "Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne,", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/09/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6943", "Record Last Updated (dd/mm/yyyy)": "27/03/2023", "Operator (or Applicant)": "Vattenfall Wind Power", "Site Name": "Ray Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4026", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne,", "County": "Northumberland", "Region": "North East", "Country": "England", "Post Code": "NE19 2RG", "X-coordinate": "395129", "Y-coordinate": "585703", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "17/01923/RENE", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/07/2022", "Under Construction": "01/07/2022", "Operational": "01/10/2022", "Heat Network Ref": "", "lat": "55.165618", "long": "-2.078", "status": "operation", "mw": 20, "ext_id": "6943"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-07-25", "start_construction": "2022-07-01", "start_operation": "2022-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Ray Battery Storage Facility", "name_short": "Ray", "owner": "Vattenfall Wind Power", "state": "north east", "country": "uk", "lat": "55.165618", "long": "-2.078", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.165618+-2.078", "construction_time_month": 3, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Minety South Battery Storage", "city": "", "id": "362", "external_id": "7184", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "362", "external_id": "7184", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Minety South - Battery Storage", "external_id": "7184", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "operation", "date_first_heard": "2017-07-19", "start_construction": "", "start_operation": "2022-10-01", "start_estimated": "", "month_disappeared": "", "lat": "51.601469", "long": "-1.98817", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7184", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy", "Site Name": "Minety South Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land South of Minety Substation Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP\ufffd", "X-coordinate": "400916", "Y-coordinate": "189181", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "17/03941/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/07/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.601469", "long": "-1.98817", "status": "planning", "mw": 50, "ext_id": "7184"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Site Name", "from": "Minety South Battery Storage", "to": "Minety South - Battery Storage", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "50", "to": "49.99", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 50, "to": 49, "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "21/08/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7184", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy", "Site Name": "Minety South - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South of Minety Substation Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP\ufffd", "X-coordinate": "400916", "Y-coordinate": "189181", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "17/03941/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/07/2020", "Under Construction": "", "Operational": "01/10/2022", "Heat Network Ref": "", "lat": "51.601469", "long": "-1.98817", "status": "operation", "mw": 49, "ext_id": "7184"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "", "start_operation": "2020-08-21"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-07-19", "start_construction": "", "start_operation": "2022-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Minety South - Battery Storage", "name_short": "Minety South", "owner": "Statera Energy", "state": "south west", "country": "uk", "lat": "51.601469", "long": "-1.98817", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.601469+-1.98817", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rabbitbrush Solar, LLC", "city": "", "id": "553", "external_id": "64630", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "553", "external_id": "64630", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rabbitbrush Solar, LLC", "external_id": "64630", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Leeward Asset Management, LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RBBAT": {"first": {"year": "2022", "month": "8", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Rabbitbrush Solar, LLC", "plant state": "CA", "plant id": "64630", "generator id": "RBBAT", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64630", "date": "2022-08", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Rabbitbrush Solar, LLC", "plant state": "CA", "plant id": "64630", "generator id": "RBBAT", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64630", "date": "2022-10", "mw": 20}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-08", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Rabbitbrush Solar, LLC", "name_short": "Rabbitbrush Solar", "owner": "Leeward Asset Management, LLC", "state": "california", "country": "usa", "lat": "40.98838017893376", "long": "-121.39762135188055", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98838017893376+-121.39762135188055", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crimson", "city": "", "id": "570", "external_id": "65140", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "RE Crimson LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "570", "external_id": "65140", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Crimson", "external_id": "65140", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 700, "power_mw": 350, "owner": "RE Crimson LLC", "status": "operation", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"SWSH1": {"first": {"year": "2022", "month": "8", "entity id": "64513", "entity name": "RE Crimson LLC", "plant producer type": "IPP", "plant name": "Crimson", "plant state": "CA", "plant id": "65140", "generator id": "SWSH1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65140", "date": "2022-08", "mw": 200}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-08", "to": "2022-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "64513", "entity name": "RE Crimson LLC", "plant producer type": "IPP", "plant name": "Crimson", "plant state": "CA", "plant id": "65140", "generator id": "SWSH1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65140", "date": "2022-10", "mw": 200}, "current_month": "2023-02", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}, "SWSH2": {"first": {"year": "2022", "month": "10", "entity id": "64513", "entity name": "RE Crimson LLC", "plant producer type": "IPP", "plant name": "Crimson", "plant state": "CA", "plant id": "65140", "generator id": "SWSH2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65140", "date": "2022-10", "mw": 150}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-10", "to": "2022-08", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "64513", "entity name": "RE Crimson LLC", "plant producer type": "IPP", "plant name": "Crimson", "plant state": "CA", "plant id": "65140", "generator id": "SWSH2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65140", "date": "2022-10", "mw": 150}, "current_month": "2023-02", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 350, "mwh_is_estimate": true, "mwh": 700, "mwh_estimate": 700, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-08", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Crimson", "name_short": "Crimson", "owner": "RE Crimson LLC", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.440049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.440049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Noble Solar", "city": "", "id": "578", "external_id": "65271", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "BT Noble Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "578", "external_id": "65271", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Noble Solar", "external_id": "65271", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "BT Noble Solar, LLC", "status": "operation", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NBSTG": {"first": {"year": "2022", "month": "6", "entity id": "64568", "entity name": "BT Noble Solar, LLC", "plant producer type": "IPP", "plant name": "Noble Solar", "plant state": "TX", "plant id": "65271", "generator id": "NBSTG", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65271", "date": "2022-06", "mw": 125}, "first_month": "2022-02", "changes": [{"month": "2022-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-06", "to": "2022-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "64568", "entity name": "BT Noble Solar, LLC", "plant producer type": "IPP", "plant name": "Noble Solar", "plant state": "TX", "plant id": "65271", "generator id": "NBSTG", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65271", "date": "2022-10", "mw": 125}, "current_month": "2023-02", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-06", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Noble Solar", "name_short": "Noble Solar", "owner": "BT Noble Solar, LLC", "state": "texas", "country": "usa", "lat": "33.268313860275576", "long": "-95.01778862977751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.268313860275576+-95.01778862977751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dalian Flow Battery", "city": "Dalian", "id": "692", "external_id": "", "state": "liaoning", "country": "china", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Dalian Institute of Chemical Physics", "developer": "", "manufacturer": "", "type": "vanadium flow", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-05", "start_estimated": "", "cost_million": "266", "cost_currency": "USD", "cost_incl_solar": "", "lat": "38.858928", "long": "121.517064", "coords_hint": "3", "use_case": "peak shaving", "notes": "will be scaled up to 200mw/800mwh", "project_website": "", "link1": "https://www.pv-magazine.com/2022/09/29/china-connects-worlds-largest-redox-flow-battery-system-to-grid/", "link2": "", "link3": "", "link4": ""}, "internal_id": "692", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-05", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Dalian Flow Battery", "name_short": "Dalian Flow Battery", "owner": "Dalian Institute of Chemical Physics", "state": "liaoning", "country": "china", "lat": "38.858928", "long": "121.517064", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.858928+121.517064", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["will be scaled up to 200mw/800mwh"], "links": ["https://www.pv-magazine.com/2022/09/29/china-connects-worlds-largest-redox-flow-battery-system-to-grid/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX12 Silicon Hill Storage", "city": "", "id": "717", "external_id": "65695", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "717", "external_id": "65695", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX12 Silicon Hill Storage", "external_id": "65695", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX12": {"first": {"year": "2022", "month": "9", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX12 Silicon Hill Storage", "plant state": "TX", "plant id": "65695", "generator id": "TX12", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65695", "date": "2022-09", "mw": 100}, "first_month": "2022-07", "changes": [{"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX12 Silicon Hill Storage", "plant state": "TX", "plant id": "65695", "generator id": "TX12", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65695", "date": "2022-10", "mw": 100}, "current_month": "2023-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-09", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "TX12 Silicon Hill Storage", "name_short": "TX12 Silicon Hill", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.313285042978755", "long": "-95.17116336610111", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.313285042978755+-95.17116336610111", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX11 Republic Road Storage", "city": "", "id": "721", "external_id": "65694", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "721", "external_id": "65694", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX11 Republic Road Storage", "external_id": "65694", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Key Capture Energy", "status": "operation", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX11": {"first": {"year": "2022", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX11 Republic Road Storage", "plant state": "TX", "plant id": "65694", "generator id": "TX11", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65694", "date": "2022-07", "mw": 50}, "first_month": "2022-07", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "10", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX11 Republic Road Storage", "plant state": "TX", "plant id": "65694", "generator id": "TX11", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65694", "date": "2022-10", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "2022-10", "start_estimated": "2022-07", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "TX11 Republic Road Storage", "name_short": "TX11 Republic Road", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.47321305365124", "long": "-95.2144724959897", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.47321305365124+-95.2144724959897", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hawkers Hill Energy Park", "city": "", "id": "836", "external_id": "12293", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Tag Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-09-22", "start_construction": "2020-05-05", "start_operation": "2022-10-03", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "836", "external_id": "12293", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hawkers Hill Energy Park", "external_id": "12293", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Tag Energy", "status": "operation", "date_first_heard": "2017-09-22", "start_construction": "2020-05-05", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.013484", "long": "-2.212803", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12293", "Record Last Updated (dd/mm/yyyy)": "13/10/2022", "Operator (or Applicant)": "Tag Energy", "Site Name": "Hawkers Hill Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawkers Hill Farm, : Shaftesbury Road, Motcombe", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "SP7 9NP", "X-coordinate": "385168", "Y-coordinate": "123811", "Planning Authority": "Dorset Council", "Planning Application Reference": "2/2017/1066/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2020", "Under Construction": "05/05/2020", "Operational": "03/10/2022", "Heat Network Ref": "", "lat": "51.013484", "long": "-2.212803", "status": "operation", "mw": 20, "ext_id": "12293"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "22/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Operational", "from": "03/10/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12293", "Record Last Updated (dd/mm/yyyy)": "13/10/2022", "Operator (or Applicant)": "Tag Energy", "Site Name": "Hawkers Hill Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawkers Hill Farm, : Shaftesbury Road, Motcombe", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "SP7 9NP", "X-coordinate": "385168", "Y-coordinate": "123811", "Planning Authority": "Dorset Council", "Planning Application Reference": "2/2017/1066/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "05/05/2020", "Operational": "", "Heat Network Ref": "", "lat": "51.013484", "long": "-2.212803", "status": "operation", "mw": 20, "ext_id": "12293"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-09-22", "start_construction": "2020-05-05", "start_operation": "2022-10-03", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Hawkers Hill Energy Park", "name_short": "Hawkers Hill Energy Park", "owner": "Tag Energy", "state": "south west", "country": "uk", "lat": "51.013484", "long": "-2.212803", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.013484+-2.212803", "construction_time_month": 29, "construction_speed_mwh_per_month": 0, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batterie Iphofen", "city": "", "id": "840", "external_id": "SEE934353123843", "state": "bavaria", "country": "germany", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "840", "external_id": "SEE934353123843", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batterie Iphofen", "external_id": "SEE934353123843", "state": "bavaria", "country": "germany", "mwh": 20, "estimate_mwh": "", "power_mw": 20, "owner": "VERBUND Energy4Business Germany GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": "", "month_disappeared": "", "lat": "49.693979", "long": "10.254467", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5436401"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE934353123843", "DatumLetzteAktualisierung": "2022-10-31T09:44:27.1024911", "LokationMaStRNummer": "SEL981216731097", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-10-31", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1403", "Landkreis": "Kitzingen", "Gemeinde": "Iphofen", "Gemeindeschluessel": "09675139", "Postleitzahl": "97346", "Gemarkung": "Iphofen", "FlurFlurstuecknummern": "3865/1", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Iphofen", "Laengengrad": "10.254467", "Breitengrad": "49.693979", "Registrierungsdatum": "2022-10-31", "Inbetriebnahmedatum": "2022-10-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Iphofen", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "20700.000", "Nettonennleistung": "20700.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20700.000", "SpeMastrNummer": "SSE993502752778", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5436401", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 20, "ext_id": "SEE934353123843", "mw": 20, "status": "operation"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE934353123843", "DatumLetzteAktualisierung": "2022-10-31T09:44:27.1024911", "LokationMaStRNummer": "SEL981216731097", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-10-31", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1403", "Landkreis": "Kitzingen", "Gemeinde": "Iphofen", "Gemeindeschluessel": "09675139", "Postleitzahl": "97346", "Gemarkung": "Iphofen", "FlurFlurstuecknummern": "3865/1", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Iphofen", "Laengengrad": "10.254467", "Breitengrad": "49.693979", "Registrierungsdatum": "2022-10-31", "Inbetriebnahmedatum": "2022-10-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Iphofen", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "20700.000", "Nettonennleistung": "20700.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20700.000", "SpeMastrNummer": "SSE993502752778", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5436401", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 20, "ext_id": "SEE934353123843", "mw": 20, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": ""}}, "mw": 20, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Batterie Iphofen", "name_short": "Batterie Iphofen", "owner": "VERBUND Energy4Business Germany GmbH", "state": "bavaria", "country": "germany", "lat": "49.693979", "long": "10.254467", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.693979+10.254467", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5436401"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bad D\u00fcben Battery Storage", "city": "", "id": "841", "external_id": "SEE961989517128", "state": "saxony", "country": "germany", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "841", "external_id": "SEE961989517128", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Bad D\u00fcben Battery Storage", "external_id": "SEE961989517128", "state": "saxony", "country": "germany", "mwh": 16, "estimate_mwh": "", "power_mw": 13, "owner": "Obton Storage GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": "", "month_disappeared": "", "lat": "51.587220", "long": "12.603890", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5428849"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE961989517128", "DatumLetzteAktualisierung": "2022-11-29T09:37:37.1680246", "LokationMaStRNummer": "SEL920993178671", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-29", "AnlagenbetreiberMastrNummer": "ABR948334917826", "Land": "84", "Bundesland": "1413", "Landkreis": "Nordsachsen", "Gemeinde": "Bad D\u00fcben", "Gemeindeschluessel": "14730020", "Postleitzahl": "04849", "Strasse": "Steinlache", "StrasseNichtGefunden": "0", "Hausnummer": "4", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bad D\u00fcben", "Laengengrad": "12.603890", "Breitengrad": "51.587220", "Registrierungsdatum": "2022-11-03", "Inbetriebnahmedatum": "2022-10-19", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Bad D\u00fcben Battery Storage", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE994278987630", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13800.000", "SpeMastrNummer": "SSE966531784430", "EegMaStRNummer": "EEG930106323720", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5428849", "owner": "Obton Storage GmbH \uff06 Co. KG", "mwh": 16, "ext_id": "SEE961989517128", "mw": 13, "status": "operation"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE961989517128", "DatumLetzteAktualisierung": "2022-11-29T09:37:37.1680246", "LokationMaStRNummer": "SEL920993178671", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-29", "AnlagenbetreiberMastrNummer": "ABR948334917826", "Land": "84", "Bundesland": "1413", "Landkreis": "Nordsachsen", "Gemeinde": "Bad D\u00fcben", "Gemeindeschluessel": "14730020", "Postleitzahl": "04849", "Strasse": "Steinlache", "StrasseNichtGefunden": "0", "Hausnummer": "4", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bad D\u00fcben", "Laengengrad": "12.603890", "Breitengrad": "51.587220", "Registrierungsdatum": "2022-11-03", "Inbetriebnahmedatum": "2022-10-19", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Bad D\u00fcben Battery Storage", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE994278987630", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13800.000", "SpeMastrNummer": "SSE966531784430", "EegMaStRNummer": "EEG930106323720", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5428849", "owner": "Obton Storage GmbH \uff06 Co. KG", "mwh": 16, "ext_id": "SEE961989517128", "mw": 13, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": ""}}, "mw": 13, "mwh_is_estimate": false, "mwh": 16, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Bad D\u00fcben Battery Storage", "name_short": "Bad D\u00fcben", "owner": "Obton Storage GmbH \uff06 Co. KG", "state": "saxony", "country": "germany", "lat": "51.587220", "long": "12.603890", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.587220+12.603890", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5428849"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cirencester Solar Farm", "city": "", "id": "911", "external_id": "12791", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Warrington Borough Council / Statkraft", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2015-09-17", "start_construction": "2018-09-06", "start_operation": "2022-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "911", "external_id": "12791", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cirencester Solar Farm", "external_id": "12791", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Warrington Borough Council / Statkraft", "status": "operation", "date_first_heard": "2015-09-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.710858", "long": "-1.921697", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12791", "Record Last Updated (dd/mm/yyyy)": "06/12/2022", "Operator (or Applicant)": "Warrington Borough Council / Statkraft", "Site Name": "Cirencester Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5276", "Installed Capacity (MWelec)": "10", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Parcel East Of, Wilpit Lane, Preston, Cirencester", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL7 5", "X-coordinate": "405507", "Y-coordinate": "201350", "Planning Authority": "Cotswold District Council", "Planning Application Reference": "15/01923/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2015", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/09/2015", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/09/2018", "Under Construction": "06/09/2018", "Operational": "13/10/2022", "Heat Network Ref": "", "lat": "51.710858", "long": "-1.921697", "status": "operation", "mw": 10, "ext_id": "12791"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "17/09/2018", "to": "06/09/2018", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "06/09/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Operational", "from": "13/10/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12791", "Record Last Updated (dd/mm/yyyy)": "06/12/2022", "Operator (or Applicant)": "Warrington Borough Council / Statkraft", "Site Name": "Cirencester Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5276", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Parcel East Of, Wilpit Lane, Preston, Cirencester", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL7 5", "X-coordinate": "405507", "Y-coordinate": "201350", "Planning Authority": "Cotswold District Council", "Planning Application Reference": "15/01923/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2015", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/09/2015", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/09/2018", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.710858", "long": "-1.921697", "status": "operation", "mw": 10, "ext_id": "12791"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2015-09-17", "start_construction": "2018-09-06", "start_operation": "2022-10-13", "start_estimated": "", "month_disappeared": "", "go_live": "2022-10", "go_live_year_int": 2022, "name": "Cirencester Solar Farm", "name_short": "Cirencester Solar Farm", "owner": "Warrington Borough Council / Statkraft", "state": "south west", "country": "uk", "lat": "51.710858", "long": "-1.921697", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.710858+-1.921697", "construction_time_month": 49, "construction_speed_mwh_per_month": 0, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "LeConte", "city": "Calexico / Imperial County", "id": "50", "external_id": "64701", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "125", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.67641", "long": "-115.670255", "coords_hint": "1", "use_case": "", "notes": "planning doc is available", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://ceqanet.opr.ca.gov/2010111056/7", "link3": "", "link4": ""}, "internal_id": "50", "external_id": "64701", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "LeConte Energy Storage", "external_id": "64701", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "LeConte Energy Storage, LLC", "status": "operation", "date_first_heard": "2021-07", "start_construction": "2022-01", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LCES": {"first": {"year": "2022", "month": "4", "entity id": "64282", "entity name": "LeConte Energy Storage, LLC", "plant producer type": "IPP", "plant name": "LeConte Energy Storage", "plant state": "CA", "plant id": "64701", "generator id": "LCES", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64701", "date": "2022-04", "mw": 125}, "first_month": "2021-07", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "9", "entity id": "64282", "entity name": "LeConte Energy Storage, LLC", "plant producer type": "IPP", "plant name": "LeConte Energy Storage", "plant state": "CA", "plant id": "64701", "generator id": "LCES", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64701", "date": "2022-09", "mw": 125}, "current_month": "2023-02", "dates": {"first_heard": "2021-07", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "2022-01", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "go_live": "2022-09", "go_live_year_int": 2022, "name": "LeConte Energy Storage", "name_short": "LeConte", "owner": "LeConte Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.67641", "long": "-115.670255", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.67641+-115.670255", "construction_time_month": 8, "construction_speed_mwh_per_month": 31, "no_of_battery_units": 0, "notes_split": ["planning doc is available"], "links": ["https://www.lspower.com/project-map/", "https://ceqanet.opr.ca.gov/2010111056/7"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batterie Diespeck", "city": "", "id": "838", "external_id": "SEE995000682977", "state": "bavaria", "country": "germany", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "838", "external_id": "SEE995000682977", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batterie Diespeck", "external_id": "SEE995000682977", "state": "bavaria", "country": "germany", "mwh": 20, "estimate_mwh": "", "power_mw": 20, "owner": "VERBUND Energy4Business Germany GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": "", "month_disappeared": "", "lat": "49.601219", "long": "10.627815", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5401312"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE995000682977", "DatumLetzteAktualisierung": "2022-10-17T05:49:14.1714465", "LokationMaStRNummer": "SEL913820694963", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-10-17", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1403", "Landkreis": "Neustadt a.d. Aisch-Bad Windsheim", "Gemeinde": "Diespeck", "Gemeindeschluessel": "09575118", "Postleitzahl": "91456", "Strasse": "Gutenstettener Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Diespeck", "Laengengrad": "10.627815", "Breitengrad": "49.601219", "Registrierungsdatum": "2022-10-17", "Inbetriebnahmedatum": "2022-09-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Diespeck", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "20700.000", "Nettonennleistung": "20700.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20700.000", "SpeMastrNummer": "SSE976359478473", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5401312", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 20, "ext_id": "SEE995000682977", "mw": 20, "status": "operation"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE995000682977", "DatumLetzteAktualisierung": "2022-10-17T05:49:14.1714465", "LokationMaStRNummer": "SEL913820694963", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-10-17", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1403", "Landkreis": "Neustadt a.d. Aisch-Bad Windsheim", "Gemeinde": "Diespeck", "Gemeindeschluessel": "09575118", "Postleitzahl": "91456", "Strasse": "Gutenstettener Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Diespeck", "Laengengrad": "10.627815", "Breitengrad": "49.601219", "Registrierungsdatum": "2022-10-17", "Inbetriebnahmedatum": "2022-09-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Diespeck", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "20700.000", "Nettonennleistung": "20700.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20700.000", "SpeMastrNummer": "SSE976359478473", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5401312", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 20, "ext_id": "SEE995000682977", "mw": 20, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": ""}}, "mw": 20, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": "", "month_disappeared": "", "go_live": "2022-09", "go_live_year_int": 2022, "name": "Batterie Diespeck", "name_short": "Batterie Diespeck", "owner": "VERBUND Energy4Business Germany GmbH", "state": "bavaria", "country": "germany", "lat": "49.601219", "long": "10.627815", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.601219+10.627815", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5401312"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lancaster Area Battery", "city": "", "id": "855", "external_id": "66050", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "254", "power_mw": "127", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "855", "external_id": "66050", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lancaster Area Battery", "external_id": "66050", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 254, "power_mw": 127, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LAB": {"first": {"year": "2022", "month": "9", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "Lancaster Area Battery", "plant state": "CA", "plant id": "66050", "generator id": "LAB", "net summer capacity (mw)": "127", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66050", "date": "2022-09", "mw": 127}, "first_month": "2022-11", "changes": [], "current": {"year": "2022", "month": "9", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "Lancaster Area Battery", "plant state": "CA", "plant id": "66050", "generator id": "LAB", "net summer capacity (mw)": "127", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66050", "date": "2022-09", "mw": 127}, "current_month": "2023-02", "dates": {"first_heard": "2022-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 127, "mwh_is_estimate": true, "mwh": 254, "mwh_estimate": 254, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11", "start_construction": "", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "go_live": "2022-09", "go_live_year_int": 2022, "name": "Lancaster Area Battery", "name_short": "Lancaster Area Battery", "owner": "AES Distributed Energy", "state": "california", "country": "usa", "lat": "40.912677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.912677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sunlight Storage", "city": "", "id": "932", "external_id": "65857", "state": "california", "country": "usa", "capacity_mwh": "920", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Sunlight Storage, LLC", "developer": "NextEra", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.803544", "long": "-115.401622", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/230mw-bess-comes-online-at-bureau-of-land-management-site-in-california/", "link2": "", "link3": "", "link4": ""}, "internal_id": "932", "external_id": "65857", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sunlight Storage", "external_id": "65857", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 460, "power_mw": 230, "owner": "Sunlight Storage, LLC", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SUNS1": {"first": {"year": "2022", "month": "9", "entity id": "65059", "entity name": "Sunlight Storage, LLC", "plant producer type": "IPP", "plant name": "Sunlight Storage", "plant state": "CA", "plant id": "65857", "generator id": "SUNS1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65857", "date": "2022-09", "mw": 230}, "first_month": "2023-02", "changes": [], "current": {"year": "2022", "month": "9", "entity id": "65059", "entity name": "Sunlight Storage, LLC", "plant producer type": "IPP", "plant name": "Sunlight Storage", "plant state": "CA", "plant id": "65857", "generator id": "SUNS1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "65857", "date": "2022-09", "mw": 230}, "current_month": "2023-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 230, "mwh_is_estimate": false, "mwh": 920, "mwh_estimate": 460, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-09", "start_estimated": "", "month_disappeared": "", "go_live": "2022-09", "go_live_year_int": 2022, "name": "Sunlight Storage", "name_short": "Sunlight", "owner": "Sunlight Storage, LLC", "state": "california", "country": "usa", "lat": "33.803544", "long": "-115.401622", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.803544+-115.401622", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/230mw-bess-comes-online-at-bureau-of-land-management-site-in-california/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arlington Energy Center II", "city": "", "id": "166", "external_id": "64481", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "132", "customer": "", "owner": "Arlington Energy Center II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "166", "external_id": "64481", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arlington Energy Center II", "external_id": "64481", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 264, "power_mw": 132, "owner": "Arlington Energy Center II", "status": "operation", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AEC2B": {"first": {"year": "2022", "month": "8", "entity id": "64144", "entity name": "Arlington Energy Center II", "plant producer type": "IPP", "plant name": "Arlington Energy Center II", "plant state": "CA", "plant id": "64481", "generator id": "AEC2B", "net summer capacity (mw)": "132", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64481", "date": "2022-08", "mw": 132}, "first_month": "2021-04", "changes": [{"month": "2022-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "8", "entity id": "64144", "entity name": "Arlington Energy Center II", "plant producer type": "IPP", "plant name": "Arlington Energy Center II", "plant state": "CA", "plant id": "64481", "generator id": "AEC2B", "net summer capacity (mw)": "132", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64481", "date": "2022-08", "mw": 132}, "current_month": "2023-02", "dates": {"first_heard": "2021-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 132, "mwh_is_estimate": true, "mwh": 264, "mwh_estimate": 264, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2022-08", "start_estimated": "2022-08", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Arlington Energy Center II", "name_short": "Arlington Energy Center II", "owner": "Arlington Energy Center II", "state": "california", "country": "usa", "lat": "41.362343242106384", "long": "-121.37792128258249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.362343242106384+-121.37792128258249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arlington Energy Center III", "city": "", "id": "181", "external_id": "64564", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "94", "power_mw": "47", "customer": "", "owner": "Arlington Energy Center III", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "181", "external_id": "64564", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arlington Energy Center III", "external_id": "64564", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 220, "power_mw": 110, "owner": "Arlington Energy Center III", "status": "operation", "date_first_heard": "2021-05", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AEC3B": {"first": {"year": "2022", "month": "12", "entity id": "64199", "entity name": "Arlington Energy Center III", "plant producer type": "IPP", "plant name": "Arlington Energy Center III", "plant state": "CA", "plant id": "64564", "generator id": "AEC3B", "net summer capacity (mw)": "47", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64564", "date": "2022-12", "mw": 47}, "first_month": "2021-05", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-12", "to": "2022-08", "extra": "accelerated by 4 months", "change_type": "timing"}, {"name": "mw", "from": 47, "to": 110, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "8", "entity id": "64199", "entity name": "Arlington Energy Center III", "plant producer type": "IPP", "plant name": "Arlington Energy Center III", "plant state": "CA", "plant id": "64564", "generator id": "AEC3B", "net summer capacity (mw)": "110", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64564", "date": "2022-08", "mw": 110}, "current_month": "2023-02", "dates": {"first_heard": "2021-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 110, "mwh_is_estimate": true, "mwh": 220, "mwh_estimate": 220, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-05", "start_construction": "", "start_operation": "2022-08", "start_estimated": "2022-12", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Arlington Energy Center III", "name_short": "Arlington Energy Center III", "owner": "Arlington Energy Center III", "state": "california", "country": "usa", "lat": "41.17891809297625", "long": "-121.12695671403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17891809297625+-121.12695671403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E1A", "city": "", "id": "186", "external_id": "64878", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "186", "external_id": "64878", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E1A", "external_id": "64878", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 266, "power_mw": 133, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "5", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E1A", "plant state": "CA", "plant id": "64878", "generator id": "BESS", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64878", "date": "2022-05", "mw": 36}, "first_month": "2021-09", "changes": [{"month": "2021-11", "li": [{"name": "mw", "from": 36, "to": 72, "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "mw", "from": 72, "to": 133, "extra": "", "change_type": "misc"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-05", "to": "2022-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "8", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E1A", "plant state": "CA", "plant id": "64878", "generator id": "BESS", "net summer capacity (mw)": "133.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64878", "date": "2022-08", "mw": 133}, "current_month": "2023-02", "dates": {"first_heard": "2021-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 133, "mwh_is_estimate": true, "mwh": 266, "mwh_estimate": 266, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2022-08", "start_estimated": "2022-05", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Edwards Sanborn E1A", "name_short": "Edwards Sanborn E1A", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.40038550275819", "long": "-121.39028196235749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.40038550275819+-121.39028196235749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lister Drive", "city": "", "id": "408", "external_id": "7740", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Arenko Cleantech", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-03-13", "start_construction": "2021-05-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "408", "external_id": "7740", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lister Drive", "external_id": "7740", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Arenko Cleantech / Stratcraft", "status": "operation", "date_first_heard": "2020-03-13", "start_construction": "2021-05-01", "start_operation": "2022-08-01", "start_estimated": "", "month_disappeared": "", "lat": "53.419914", "long": "-2.927592", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7740", "Record Last Updated (dd/mm/yyyy)": "07/05/2021", "Operator (or Applicant)": "Arenko Cleantech", "Site Name": "Lister Drive", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Adjacent to Lister Drive, Carnegie Road, Liverpool, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338451", "Y-coordinate": "391858", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "20F/0335", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/03/2023", "Under Construction": "01/05/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.419914", "long": "-2.927592", "status": "construction", "mw": 49, "ext_id": "7740"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Land Adjacent to Lister Drive, Carnegie Road, Liverpool, Merseyside", "to": "Land Adjacent to Lister Drive, Carnegie Road, Liverpool, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/05/2021", "to": "17/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/05/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "04/01/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Arenko Cleantech", "to": "Arenko Cleantech / Stratcraft", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/08/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7740", "Record Last Updated (dd/mm/yyyy)": "04/01/2023", "Operator (or Applicant)": "Arenko Cleantech / Stratcraft", "Site Name": "Lister Drive", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent to Lister Drive, Carnegie Road, Liverpool, ", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338451", "Y-coordinate": "391858", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "20F/0335", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/03/2023", "Under Construction": "01/05/2021", "Operational": "01/08/2022", "Heat Network Ref": "", "lat": "53.419914", "long": "-2.927592", "status": "operation", "mw": 49, "ext_id": "7740"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-07", "start_construction": "", "start_operation": "2023-01-04"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-03-13", "start_construction": "2021-05-01", "start_operation": "2022-08-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Lister Drive", "name_short": "Lister Drive", "owner": "Arenko Cleantech / Stratcraft", "state": "north west", "country": "uk", "lat": "53.419914", "long": "-2.927592", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419914+-2.927592", "construction_time_month": 15, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Swoose II", "city": "", "id": "941", "external_id": "66008", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "202", "power_mw": "101", "customer": "", "owner": "Swoose II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "941", "external_id": "66008", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Swoose II", "external_id": "66008", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 202, "power_mw": 101, "owner": "Swoose II", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "8", "entity id": "65183", "entity name": "Swoose II", "plant producer type": "IPP", "plant name": "Swoose II", "plant state": "TX", "plant id": "66008", "generator id": "BA", "net summer capacity (mw)": "101", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66008", "date": "2022-08", "mw": 101}, "first_month": "2023-02", "changes": [], "current": {"year": "2022", "month": "8", "entity id": "65183", "entity name": "Swoose II", "plant producer type": "IPP", "plant name": "Swoose II", "plant state": "TX", "plant id": "66008", "generator id": "BA", "net summer capacity (mw)": "101", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66008", "date": "2022-08", "mw": 101}, "current_month": "2023-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 101, "mwh_is_estimate": true, "mwh": 202, "mwh_estimate": 202, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-08", "start_estimated": "", "month_disappeared": "", "go_live": "2022-08", "go_live_year_int": 2022, "name": "Swoose II", "name_short": "Swoose II", "owner": "Swoose II", "state": "texas", "country": "usa", "lat": "33.48557373342624", "long": "-95.17643023533789", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.48557373342624+-95.17643023533789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Docordova", "city": "Hood County", "id": "38", "external_id": "8063", "state": "texas", "country": "usa", "capacity_mwh": "260", "estimate_mwh": "", "power_mw": "260", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.430077", "long": "-97.695028", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://urjadaily.com/vistra-brings-worlds-largest-utility-scale-battery-energy-storage-system-online/", "link2": "", "link3": "", "link4": ""}, "internal_id": "38", "external_id": "8063", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "DeCordova Steam Electric Station", "external_id": "8063", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 520, "power_mw": 260, "owner": "Luminant Generation Company LLC", "status": "operation", "date_first_heard": "2020-11", "start_construction": "2021-12", "start_operation": "2022-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2021", "month": "7", "entity id": "55983", "entity name": "Luminant Generation Company LLC", "plant producer type": "IPP", "plant name": "DeCordova Steam Electric Station", "plant state": "TX", "plant id": "8063", "generator id": "BESS", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "8063", "date": "2021-07", "mw": 260}, "first_month": "2020-11", "changes": [{"month": "2021-02", "li": [{"name": "date", "from": "2021-07", "to": "2022-02", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "date", "from": "2022-02", "to": "2022-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "7", "entity id": "55983", "entity name": "Luminant Generation Company LLC", "plant producer type": "IPP", "plant name": "DeCordova Steam Electric Station", "plant state": "TX", "plant id": "8063", "generator id": "BESS", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "8063", "date": "2022-07", "mw": 260}, "current_month": "2023-02", "dates": {"first_heard": "2020-11", "start_construction": "2021-12"}, "month_disappeared": ""}}, "mw": 260, "mwh_is_estimate": false, "mwh": 260, "mwh_estimate": 520, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-11", "start_construction": "2021-12", "start_operation": "2022-07", "start_estimated": "2022", "month_disappeared": "", "go_live": "2022-07", "go_live_year_int": 2022, "name": "DeCordova Steam Electric Station", "name_short": "DeCordova Steam Electric Station", "owner": "Luminant Generation Company LLC", "state": "texas", "country": "usa", "lat": "32.430077", "long": "-97.695028", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.430077+-97.695028", "construction_time_month": 7, "construction_speed_mwh_per_month": 37, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://urjadaily.com/vistra-brings-worlds-largest-utility-scale-battery-energy-storage-system-online/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn S1", "city": "", "id": "554", "external_id": "64929", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "554", "external_id": "64929", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn S1", "external_id": "64929", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 84, "power_mw": 42, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "3", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S1", "plant state": "CA", "plant id": "64929", "generator id": "BESS", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64929", "date": "2022-03", "mw": 11}, "first_month": "2021-11", "changes": [{"month": "2022-02", "li": [{"name": "mw", "from": 11, "to": 42, "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "7", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S1", "plant state": "CA", "plant id": "64929", "generator id": "BESS", "net summer capacity (mw)": "42.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64929", "date": "2022-07", "mw": 42}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 42, "mwh_is_estimate": true, "mwh": 84, "mwh_estimate": 84, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-07", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2022-07", "go_live_year_int": 2022, "name": "Edwards Sanborn S1", "name_short": "Edwards Sanborn S1", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "40.94387837493652", "long": "-121.3581441949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94387837493652+-121.3581441949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn S3", "city": "", "id": "572", "external_id": "64928", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "35", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "572", "external_id": "64928", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn S3", "external_id": "64928", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 70, "power_mw": 35, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "3", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S3", "plant state": "CA", "plant id": "64928", "generator id": "BESS", "net summer capacity (mw)": "35.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64928", "date": "2022-03", "mw": 35}, "first_month": "2022-02", "changes": [{"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-06", "to": "2022-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "7", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn S3", "plant state": "CA", "plant id": "64928", "generator id": "BESS", "net summer capacity (mw)": "35.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64928", "date": "2022-07", "mw": 35}, "current_month": "2023-02", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 35, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-07", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2022-07", "go_live_year_int": 2022, "name": "Edwards Sanborn S3", "name_short": "Edwards Sanborn S3", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.01452451357819", "long": "-121.448908126965", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01452451357819+-121.448908126965", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mililani South Solar Farm", "city": "", "id": "574", "external_id": "57242", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "78", "power_mw": "39", "customer": "", "owner": "Mililani I Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "574", "external_id": "57242", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mililani South Solar Farm", "external_id": "57242", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 78, "power_mw": 39, "owner": "Mililani I Solar LLC", "status": "operation", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"2": {"first": {"year": "2022", "month": "7", "entity id": "62893", "entity name": "Mililani I Solar LLC", "plant producer type": "IPP", "plant name": "Mililani South Solar Farm", "plant state": "HI", "plant id": "57242", "generator id": "2", "net summer capacity (mw)": "39", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "57242", "date": "2022-07", "mw": 39}, "first_month": "2022-02", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-07", "to": "2022-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-09", "to": "2022-07", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "7", "entity id": "62893", "entity name": "Mililani I Solar LLC", "plant producer type": "IPP", "plant name": "Mililani South Solar Farm", "plant state": "HI", "plant id": "57242", "generator id": "2", "net summer capacity (mw)": "39", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57242", "date": "2022-07", "mw": 39}, "current_month": "2023-02", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 39, "mwh_is_estimate": true, "mwh": 78, "mwh_estimate": 78, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "2022-07", "start_estimated": "2022-07", "month_disappeared": "", "go_live": "2022-07", "go_live_year_int": 2022, "name": "Mililani South Solar Farm", "name_short": "Mililani South Solar Farm", "owner": "Mililani I Solar LLC", "state": "hawaii", "country": "usa", "lat": "19.395004114284703", "long": "-155.58399087471747", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.395004114284703+-155.58399087471747", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hickory Park", "city": "Mitchell County", "id": "43", "external_id": "63522", "state": "georgia", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "40", "customer": "RWE Renewables", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "GridSolv Quantum", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-11-17", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.31621", "long": "-84.124752", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "2021: 30 year PPA with Georgia Power", "project_website": "", "link1": "https://www.energy-storage.news/lg-energy-solution-supplying-800mwh-battery-storage-for-rwes-us-solar-plus-storage-projects/", "link2": "https://www.rwe.com/en/press/rwe-renewables/2020-11-17-rwes-hickory-park-solar-project-with-co-located-storage-facility-under-construction", "link3": "", "link4": ""}, "internal_id": "43", "external_id": "63522", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hickory Park Solar Hybrid", "external_id": "63522", "state": "georgia", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "RWE Renewables Americas LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HPBAT": {"first": {"year": "2021", "month": "11", "entity id": "56215", "entity name": "RWE Renewables Americas LLC", "plant producer type": "IPP", "plant name": "Hickory Park Solar Hybrid", "plant state": "GA", "plant id": "63522", "generator id": "HPBAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63522", "date": "2021-11", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "56215", "entity name": "RWE Renewables Americas LLC", "plant producer type": "IPP", "plant name": "Hickory Park Solar Hybrid", "plant state": "GA", "plant id": "63522", "generator id": "HPBAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63522", "date": "2022-06", "mw": 40}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Hickory Park Solar Hybrid", "name_short": "Hickory Park Solar", "owner": "RWE Renewables Americas LLC", "state": "georgia", "country": "usa", "lat": "31.31621", "long": "-84.124752", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.31621+-84.124752", "construction_time_month": 10, "construction_speed_mwh_per_month": 8, "no_of_battery_units": 0, "notes_split": ["2021: 30 year PPA with Georgia Power"], "links": ["https://www.energy-storage.news/lg-energy-solution-supplying-800mwh-battery-storage-for-rwes-us-solar-plus-storage-projects/", "https://www.rwe.com/en/press/rwe-renewables/2020-11-17-rwes-hickory-park-solar-project-with-co-located-storage-facility-under-construction"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Luna Storage", "city": "", "id": "170", "external_id": "63685", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Luna Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "170", "external_id": "63685", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Luna Storage", "external_id": "63685", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LUNA": {"first": {"year": "2021", "month": "7", "entity id": "63403", "entity name": "Luna Storage, LLC", "plant producer type": "IPP", "plant name": "Luna Storage", "plant state": "CA", "plant id": "63685", "generator id": "LUNA", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63685", "date": "2021-07", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-07", "to": "2021-10", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2022-04", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "entity id", "from": "63403", "to": "61012", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Luna Storage, LLC", "to": "AES Distributed Energy", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "Luna Storage", "plant state": "CA", "plant id": "63685", "generator id": "LUNA", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63685", "date": "2022-06", "mw": 100}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-04"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2022-06", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Luna Storage", "name_short": "Luna", "owner": "AES Distributed Energy", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.440049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.440049", "construction_time_month": 14, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Maverick Solar 6, LLC", "city": "", "id": "179", "external_id": "64105", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Maverick Solar 6, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "179", "external_id": "64105", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Maverick Solar 6, LLC", "external_id": "64105", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Maverick Solar 6, LLC", "status": "operation", "date_first_heard": "2020-12", "start_construction": "2021-02", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MAV04": {"first": {"year": "2021", "month": "12", "entity id": "63733", "entity name": "Maverick Solar 6, LLC", "plant producer type": "IPP", "plant name": "Maverick Solar 6, LLC", "plant state": "CA", "plant id": "64105", "generator id": "MAV04", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64105", "date": "2021-12", "mw": 50}, "first_month": "2020-12", "changes": [{"month": "2021-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-12", "to": "2022-05", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "63733", "entity name": "Maverick Solar 6, LLC", "plant producer type": "IPP", "plant name": "Maverick Solar 6, LLC", "plant state": "CA", "plant id": "64105", "generator id": "MAV04", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64105", "date": "2022-06", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2020-12", "start_construction": "2021-02"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-12", "start_construction": "2021-02", "start_operation": "2022-06", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Maverick Solar 6, LLC", "name_short": "Maverick Solar 6", "owner": "Maverick Solar 6, LLC", "state": "california", "country": "usa", "lat": "41.01822925590127", "long": "-120.97859189749224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01822925590127+-120.97859189749224", "construction_time_month": 16, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Azure Sky Solar", "city": "", "id": "249", "external_id": "63905", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "154", "power_mw": "77", "customer": "", "owner": "Azure Sky Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "249", "external_id": "63905", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Azure Sky Solar", "external_id": "63905", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 154, "power_mw": 77, "owner": "Azure Sky Solar Project, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ASKYB": {"first": {"year": "2021", "month": "8", "entity id": "63571", "entity name": "Azure Sky Solar Project, LLC", "plant producer type": "IPP", "plant name": "Azure Sky Solar", "plant state": "TX", "plant id": "63905", "generator id": "ASKYB", "net summer capacity (mw)": "77", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63905", "date": "2021-08", "mw": 77}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "63571", "entity name": "Azure Sky Solar Project, LLC", "plant producer type": "IPP", "plant name": "Azure Sky Solar", "plant state": "TX", "plant id": "63905", "generator id": "ASKYB", "net summer capacity (mw)": "77", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63905", "date": "2022-06", "mw": 77}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 77, "mwh_is_estimate": true, "mwh": 154, "mwh_estimate": 154, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2022-06", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Azure Sky Solar", "name_short": "Azure Sky Solar", "owner": "Azure Sky Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.539960724436234", "long": "-95.53783171153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.539960724436234+-95.53783171153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Santa Ana Storage 2", "city": "", "id": "552", "external_id": "64921", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "552", "external_id": "64921", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Santa Ana Storage 2", "external_id": "64921", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Johanna Energy Center, LLC", "status": "operation", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SAP2": {"first": {"year": "2022", "month": "4", "entity id": "63522", "entity name": "Johanna Energy Center, LLC", "plant producer type": "IPP", "plant name": "Santa Ana Storage 2", "plant state": "CA", "plant id": "64921", "generator id": "SAP2", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64921", "date": "2022-04", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-05", "to": "2022-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "6", "entity id": "63522", "entity name": "Johanna Energy Center, LLC", "plant producer type": "IPP", "plant name": "Santa Ana Storage 2", "plant state": "CA", "plant id": "64921", "generator id": "SAP2", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64921", "date": "2022-06", "mw": 20}, "current_month": "2023-02", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "2022-06", "start_estimated": "2022-04", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Santa Ana Storage 2", "name_short": "Santa Ana Storage 2", "owner": "Johanna Energy Center, LLC", "state": "california", "country": "usa", "lat": "41.03803592366989", "long": "-121.41654744719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.03803592366989+-121.41654744719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crossett Power Management LLC", "city": "", "id": "938", "external_id": "66009", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "406", "power_mw": "203", "customer": "", "owner": "Crossett Power Management LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "938", "external_id": "66009", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Crossett Power Management LLC", "external_id": "66009", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 406, "power_mw": 203, "owner": "Crossett Power Management LLC", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "6", "entity id": "65184", "entity name": "Crossett Power Management LLC", "plant producer type": "IPP", "plant name": "Crossett Power Management LLC", "plant state": "TX", "plant id": "66009", "generator id": "BA", "net summer capacity (mw)": "203", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66009", "date": "2022-06", "mw": 203}, "first_month": "2023-02", "changes": [], "current": {"year": "2022", "month": "6", "entity id": "65184", "entity name": "Crossett Power Management LLC", "plant producer type": "IPP", "plant name": "Crossett Power Management LLC", "plant state": "TX", "plant id": "66009", "generator id": "BA", "net summer capacity (mw)": "203", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66009", "date": "2022-06", "mw": 203}, "current_month": "2023-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 203, "mwh_is_estimate": true, "mwh": 406, "mwh_estimate": 406, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-06", "start_estimated": "", "month_disappeared": "", "go_live": "2022-06", "go_live_year_int": 2022, "name": "Crossett Power Management LLC", "name_short": "Crossett Power Management", "owner": "Crossett Power Management LLC", "state": "texas", "country": "usa", "lat": "33.31533668045898", "long": "-95.0825099893275", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.31533668045898+-95.0825099893275", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Outer Cape Community Battery", "city": "", "id": "220", "external_id": "62604", "state": "massachusetts", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Eversource", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "220", "external_id": "62604", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Outer Cape Community Battery", "external_id": "62604", "state": "massachusetts", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Eversource", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OCESS": {"first": {"year": "2021", "month": "3", "entity id": "59497", "entity name": "Eversource", "plant producer type": "IPP", "plant name": "Outer Cape Community Battery", "plant state": "MA", "plant id": "62604", "generator id": "OCESS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62604", "date": "2021-03", "mw": 25}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-05", "li": [{"name": "date", "from": "2021-03", "to": "2021-09", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-12", "to": "2022-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-04", "to": "2022-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-06", "to": "2022-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2022", "month": "5", "entity id": "59497", "entity name": "Eversource", "plant producer type": "IPP", "plant name": "Outer Cape Community Battery", "plant state": "MA", "plant id": "62604", "generator id": "OCESS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62604", "date": "2022-05", "mw": 25}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-12"}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-05", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2022-05", "go_live_year_int": 2022, "name": "Outer Cape Community Battery", "name_short": "Outer Cape Community Battery", "owner": "Eversource", "state": "massachusetts", "country": "usa", "lat": "42.571152", "long": "-71.761147", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.571152+-71.761147", "construction_time_month": 17, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wishaw 49.9 Battery Storage Facility", "city": "", "id": "509", "external_id": "9522", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Spectrum Reserve Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "509", "external_id": "9522", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wishaw Battery Storage Facility", "external_id": "9522", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Zenobe Energy", "status": "operation", "date_first_heard": "2020-09-24", "start_construction": "2022-04-01", "start_operation": "2022-05-10", "start_estimated": "", "month_disappeared": "", "lat": "55.769111", "long": "-3.938428", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9522", "Record Last Updated (dd/mm/yyyy)": "01/09/2021", "Operator (or Applicant)": "Spectrum Reserve Limited", "Site Name": "Wishaw 49.9 Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Netherton Street Netherton Wishaw", "County": "Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML2 0DP", "X-coordinate": "278488", "Y-coordinate": "654565", "Planning Authority": "North Lanarkshire Council", "Planning Application Reference": "20/00946/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/09/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.769111", "long": "-3.938428", "status": "planning", "mw": 49, "ext_id": "9522"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/09/2021", "to": "10/05/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Operator (or Applicant)", "from": "Spectrum Reserve Limited", "to": "Zenobe Energy", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Wishaw 49.9 Battery Storage Facility", "to": "Wishaw Battery Storage Facility", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9522", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Wishaw Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Netherton Street Netherton Wishaw", "County": "Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML2 0DP", "X-coordinate": "278488", "Y-coordinate": "654565", "Planning Authority": "North Lanarkshire Council", "Planning Application Reference": "20/00946/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/09/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2022", "Operational": "", "Heat Network Ref": "", "lat": "55.769111", "long": "-3.938428", "status": "operation", "mw": 49, "ext_id": "9522"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-01", "start_construction": "2022-05-10", "start_operation": "2022-05-10"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09-24", "start_construction": "2022-04-01", "start_operation": "2022-05-10", "start_estimated": "", "month_disappeared": "", "go_live": "2022-05", "go_live_year_int": 2022, "name": "Wishaw Battery Storage Facility", "name_short": "Wishaw", "owner": "Zenobe Energy", "state": "scotland", "country": "uk", "lat": "55.769111", "long": "-3.938428", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.769111+-3.938428", "construction_time_month": 1, "construction_speed_mwh_per_month": 49, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Moss landing / Elkhorn", "city": "close to santa cruz", "id": "7", "external_id": "62564", "state": "california", "country": "usa", "capacity_mwh": "730", "estimate_mwh": "", "power_mw": "182", "customer": "PG&E", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "256", "status": "operation", "date_first_heard": "", "start_construction": "2020-07-01", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.807971", "long": "-121.781701", "coords_hint": "1", "use_case": "", "notes": "in 2020, 64mwh were added", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "link2": "https://en.wikipedia.org/wiki/Tesla_Megapack", "link3": "", "link4": ""}, "internal_id": "7", "external_id": "62564", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elkhorn Battery Energy Storage System", "external_id": "62564", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 364, "power_mw": 182, "owner": "Pacific Gas & Electric Co.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELKHO": {"first": {"year": "2021", "month": "3", "entity id": "14328", "entity name": "Pacific Gas & Electric Co.", "plant producer type": "Electric Utility", "plant name": "Elkhorn Battery Energy Storage System", "plant state": "CA", "plant id": "62564", "generator id": "ELKHO", "net summer capacity (mw)": "182.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62564", "date": "2021-03", "mw": 182}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-03", "to": "2021-07", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "14328", "entity name": "Pacific Gas & Electric Co.", "plant producer type": "Electric Utility", "plant name": "Elkhorn Battery Energy Storage System", "plant state": "CA", "plant id": "62564", "generator id": "ELKHO", "net summer capacity (mw)": "182.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62564", "date": "2022-04", "mw": 182}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-12"}, "month_disappeared": ""}}, "mw": 182, "mwh_is_estimate": false, "mwh": 730, "mwh_estimate": 364, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Elkhorn Battery Energy Storage System", "name_short": "Elkhorn Battery", "owner": "Pacific Gas & Electric Co.", "state": "california", "country": "usa", "lat": "36.807971", "long": "-121.781701", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.807971+-121.781701", "construction_time_month": 16, "construction_speed_mwh_per_month": 45, "no_of_battery_units": 256, "notes_split": ["in 2020, 64mwh were added"], "links": ["https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "https://en.wikipedia.org/wiki/Tesla_Megapack"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Diablo", "city": "Pittsburg", "id": "47", "external_id": "62175", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "LS Power / PG & E", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-30", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.015262", "long": "-121.846146", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/direct-energy-business-to-use-some-of-worlds-biggest-battery-projects-to-serve-california-customers/", "link2": "https://www.lspower.com/project-map/", "link3": "https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21131879/pge-poised-to-expand-battery-energy-storage-capacity-by-more-than-420-mw", "link4": ""}, "internal_id": "47", "external_id": "62175", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Diablo Energy Storage", "external_id": "62175", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Diablo Energy Storage, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-05", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DIBLO": {"first": {"year": "2021", "month": "8", "entity id": "61684", "entity name": "Diablo Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Diablo Energy Storage", "plant state": "CA", "plant id": "62175", "generator id": "DIBLO", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62175", "date": "2021-08", "mw": 250}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "mw", "from": 250, "to": 200, "extra": "", "change_type": "misc"}]}, {"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2022-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "61684", "entity name": "Diablo Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Diablo Energy Storage", "plant state": "CA", "plant id": "62175", "generator id": "DIBLO", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62175", "date": "2022-04", "mw": 200}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-05"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-05", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Diablo Energy Storage", "name_short": "Diablo", "owner": "Diablo Energy Storage, LLC", "state": "california", "country": "usa", "lat": "38.015262", "long": "-121.846146", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.015262+-121.846146", "construction_time_month": 11, "construction_speed_mwh_per_month": 72, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/direct-energy-business-to-use-some-of-worlds-biggest-battery-projects-to-serve-california-customers/", "https://www.lspower.com/project-map/", "https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21131879/pge-poised-to-expand-battery-energy-storage-capacity-by-more-than-420-mw"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coso", "city": "Coso Junction, Little Lake", "id": "117", "external_id": "63943", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "60", "customer": "", "owner": "Arevon", "developer": "Arevon", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.056513", "long": "-117.858611", "coords_hint": "0", "use_case": "", "notes": "took the location from arevon website, but on google maps satellite seems like an unlikely location, this project is most likely tesla given that arevon has signed a large deal with tesla", "project_website": "https://arevonenergy.com/location/coso/", "link1": "https://arevonenergy.com/arevon-signs-agreement-for-2-gw-6-gwh-of-tesla-megapack-systems/", "link2": "", "link3": "", "link4": ""}, "internal_id": "117", "external_id": "63943", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Coso Battery Storage", "external_id": "63943", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Arevon Asset Management", "status": "operation", "date_first_heard": "2020-10", "start_construction": "2021-05", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61730": {"first": {"year": "2021", "month": "6", "entity id": "63611", "entity name": "Coso Battery Storage LLC", "plant producer type": "IPP", "plant name": "Coso Battery Storage", "plant state": "CA", "plant id": "63943", "generator id": "61730", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63943", "date": "2021-06", "mw": 60}, "first_month": "2020-10", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2021-06", "to": "2021-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "entity id", "from": "63611", "to": "64172", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Coso Battery Storage LLC", "to": "Arevon Asset Management", "extra": "", "change_type": "misc"}]}, {"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-08", "to": "2021-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "64172", "entity name": "Arevon Asset Management", "plant producer type": "IPP", "plant name": "Coso Battery Storage", "plant state": "CA", "plant id": "63943", "generator id": "61730", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63943", "date": "2022-04", "mw": 60}, "current_month": "2023-02", "dates": {"first_heard": "2020-10", "start_construction": "2021-05"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": false, "mwh": 240, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10", "start_construction": "2021-05", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Coso Battery Storage", "name_short": "Coso", "owner": "Arevon Asset Management", "state": "california", "country": "usa", "lat": "36.056513", "long": "-117.858611", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.056513+-117.858611", "construction_time_month": 11, "construction_speed_mwh_per_month": 21, "no_of_battery_units": 0, "notes_split": ["took the location from arevon website, but on google maps satellite seems like an unlikely location, this project is most likely tesla given that arevon has signed a large deal with tesla"], "links": ["https://arevonenergy.com/arevon-signs-agreement-for-2-gw-6-gwh-of-tesla-megapack-systems/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Slate Hybrid", "city": "", "id": "177", "external_id": "63727", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "RE Slate 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "177", "external_id": "63727", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Slate Hybrid", "external_id": "63727", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 278, "power_mw": 139, "owner": "MN8 Energy LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-03", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"SLBES": {"first": {"year": "2020", "month": "12", "entity id": "62780", "entity name": "RE Slate LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBES", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63727", "date": "2020-12", "mw": 300}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "date", "from": "2020-12", "to": "2021-10", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2021-03", "li": [{"name": "entity name", "from": "RE Slate LLC", "to": "RE Slate 1 LLC", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-10", "to": "2022-03", "extra": "delayed by 5 months", "change_type": "timing"}, {"name": "mw", "from": 300, "to": 50, "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "entity id", "from": "62780", "to": "61944", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "RE Slate 1 LLC", "to": "Goldman Sachs Renewable Power Group", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power Group", "to": "Goldman Sachs Renewable Power LLC", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power LLC", "to": "MN8 Energy LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "61944", "entity name": "MN8 Energy LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBES", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63727", "date": "2022-04", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-03"}, "month_disappeared": ""}, "SLBSV": {"first": {"year": "2021", "month": "11", "entity id": "62780", "entity name": "RE Slate 1 LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBSV", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63727", "date": "2021-11", "mw": 46}, "first_month": "2021-03", "changes": [{"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "entity id", "from": "62780", "to": "61944", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "RE Slate 1 LLC", "to": "Goldman Sachs Renewable Power Group", "extra": "", "change_type": "misc"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-11", "to": "2022-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power Group", "to": "Goldman Sachs Renewable Power LLC", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power LLC", "to": "MN8 Energy LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "2", "entity id": "61944", "entity name": "MN8 Energy LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBSV", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63727", "date": "2022-02", "mw": 46}, "current_month": "2023-02", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}, "SLB3C": {"first": {"year": "2021", "month": "12", "entity id": "62780", "entity name": "RE Slate 1 LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLB3C", "net summer capacity (mw)": "33.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63727", "date": "2021-12", "mw": 33}, "first_month": "2021-03", "changes": [{"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "entity id", "from": "62780", "to": "61944", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "RE Slate 1 LLC", "to": "Goldman Sachs Renewable Power Group", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power Group", "to": "Goldman Sachs Renewable Power LLC", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power LLC", "to": "MN8 Energy LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "61944", "entity name": "MN8 Energy LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLB3C", "net summer capacity (mw)": "33.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63727", "date": "2022-03", "mw": 33}, "current_month": "2023-02", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}, "SLBPW": {"first": {"year": "2022", "month": "1", "entity id": "62780", "entity name": "RE Slate 1 LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBPW", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63727", "date": "2022-01", "mw": 10}, "first_month": "2021-03", "changes": [{"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "entity id", "from": "62780", "to": "61944", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "RE Slate 1 LLC", "to": "Goldman Sachs Renewable Power Group", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power Group", "to": "Goldman Sachs Renewable Power LLC", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "entity name", "from": "Goldman Sachs Renewable Power LLC", "to": "MN8 Energy LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "61944", "entity name": "MN8 Energy LLC", "plant producer type": "IPP", "plant name": "Slate Hybrid", "plant state": "CA", "plant id": "63727", "generator id": "SLBPW", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63727", "date": "2022-03", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 139, "mwh_is_estimate": true, "mwh": 278, "mwh_estimate": 278, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-03", "start_operation": "2022-04", "start_estimated": "2022-03", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Slate Hybrid", "name_short": "Slate", "owner": "MN8 Energy LLC", "state": "california", "country": "usa", "lat": "40.88482600365377", "long": "-121.12724013582601", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.88482600365377+-121.12724013582601", "construction_time_month": 13, "construction_speed_mwh_per_month": 21, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E2", "city": "", "id": "188", "external_id": "64879", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "188", "external_id": "64879", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E2", "external_id": "64879", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 244, "power_mw": 122, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2021", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E2", "plant state": "CA", "plant id": "64879", "generator id": "BESS", "net summer capacity (mw)": "33", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64879", "date": "2021-12", "mw": 33}, "first_month": "2021-09", "changes": [{"month": "2021-11", "li": [{"name": "mw", "from": 33, "to": 66, "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 66, "to": 122, "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E2", "plant state": "CA", "plant id": "64879", "generator id": "BESS", "net summer capacity (mw)": "122.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64879", "date": "2022-04", "mw": 122}, "current_month": "2023-02", "dates": {"first_heard": "2021-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 122, "mwh_is_estimate": true, "mwh": 244, "mwh_estimate": 244, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2022-04", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Edwards Sanborn E2", "name_short": "Edwards Sanborn E2", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "41.320172844770276", "long": "-121.57187871010998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.320172844770276+-121.57187871010998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batterie Eisenach", "city": "", "id": "678", "external_id": "SEE982806373970", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "678", "external_id": "SEE982806373970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batterie Eisenach", "external_id": "SEE982806373970", "state": "thuringia", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "VERBUND Energy4Business Germany GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "", "month_disappeared": "", "lat": "50.978959", "long": "10.292710", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5001456"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE982806373970", "DatumLetzteAktualisierung": "2022-04-26T05:50:01.7340442", "LokationMaStRNummer": "SEL901500514236", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-04-26", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1415", "Landkreis": "Eisenach", "Gemeinde": "Eisenach", "Gemeindeschluessel": "16056000", "Postleitzahl": "99817", "Strasse": "Adam-Opel-Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "15", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Eisenach", "Laengengrad": "10.292710", "Breitengrad": "50.978959", "Registrierungsdatum": "2022-04-26", "Inbetriebnahmedatum": "2022-04-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Eisenach", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "10350.000", "Nettonennleistung": "10350.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10350.000", "SpeMastrNummer": "SSE916426432625", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5001456", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 10, "ext_id": "SEE982806373970", "mw": 10, "status": "operation"}, "first_month": "2022-05", "changes": [], "current": {"EinheitMastrNummer": "SEE982806373970", "DatumLetzteAktualisierung": "2022-04-26T05:50:01.7340442", "LokationMaStRNummer": "SEL901500514236", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-04-26", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1415", "Landkreis": "Eisenach", "Gemeinde": "Eisenach", "Gemeindeschluessel": "16056000", "Postleitzahl": "99817", "Strasse": "Adam-Opel-Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "15", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Eisenach", "Laengengrad": "10.292710", "Breitengrad": "50.978959", "Registrierungsdatum": "2022-04-26", "Inbetriebnahmedatum": "2022-04-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Eisenach", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "10350.000", "Nettonennleistung": "10350.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10350.000", "SpeMastrNummer": "SSE916426432625", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5001456", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 10, "ext_id": "SEE982806373970", "mw": 10, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Batterie Eisenach", "name_short": "Batterie Eisenach", "owner": "VERBUND Energy4Business Germany GmbH", "state": "thuringia", "country": "germany", "lat": "50.978959", "long": "10.292710", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.978959+10.292710", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5001456"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Anode (Springville) BESS", "city": "", "id": "679", "external_id": "65458", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "679", "external_id": "65458", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Anode (Springville) BESS", "external_id": "65458", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 448, "power_mw": 224, "owner": "Southern California Edison Co", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2022-05", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"ANOD1": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Anode (Springville) BESS", "plant state": "CA", "plant id": "65458", "generator id": "ANOD1", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65458", "date": "2022-08", "mw": 112}, "first_month": "2022-04", "changes": [{"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-04", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-05", "to": "2023-11", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-11", "to": "2024-06", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Anode (Springville) BESS", "plant state": "CA", "plant id": "65458", "generator id": "ANOD1", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65458", "date": "2024-07", "mw": 112}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-05"}, "month_disappeared": ""}, "ANOD2": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Anode (Springville) BESS", "plant state": "CA", "plant id": "65458", "generator id": "ANOD2", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65458", "date": "2022-08", "mw": 112}, "first_month": "2022-04", "changes": [{"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-09", "to": "2022-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-04", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-05", "to": "2023-11", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-11", "to": "2024-06", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Anode (Springville) BESS", "plant state": "CA", "plant id": "65458", "generator id": "ANOD2", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65458", "date": "2024-07", "mw": 112}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-05"}, "month_disappeared": ""}}, "mw": 224, "mwh_is_estimate": true, "mwh": 448, "mwh_estimate": 448, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2022-05", "start_operation": "2022-04-08", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Anode (Springville) BESS", "name_short": "Anode (Springville)", "owner": "Southern California Edison Co", "state": "california", "country": "usa", "lat": "41.01822925590127", "long": "-120.97859189749224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01822925590127+-120.97859189749224", "construction_time_month": -1, "construction_speed_mwh_per_month": -448, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Separator (Etiwanda) BESS", "city": "", "id": "680", "external_id": "65456", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "680", "external_id": "65456", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Separator (Etiwanda) BESS", "external_id": "65456", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 224, "power_mw": 112, "owner": "Southern California Edison Co", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2022-05", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SEPAR": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Separator (Etiwanda) BESS", "plant state": "CA", "plant id": "65456", "generator id": "SEPAR", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65456", "date": "2022-08", "mw": 112}, "first_month": "2022-04", "changes": [{"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-08", "to": "2022-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-09", "to": "2022-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-03", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Separator (Etiwanda) BESS", "plant state": "CA", "plant id": "65456", "generator id": "SEPAR", "net summer capacity (mw)": "112.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65456", "date": "2024-06", "mw": 112}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-05"}, "month_disappeared": ""}}, "mw": 112, "mwh_is_estimate": true, "mwh": 224, "mwh_estimate": 224, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2022-05", "start_operation": "2022-04-08", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Separator (Etiwanda) BESS", "name_short": "Separator (Etiwanda)", "owner": "Southern California Edison Co", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.140049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.140049", "construction_time_month": -1, "construction_speed_mwh_per_month": -224, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Flower Valley II", "city": "", "id": "940", "external_id": "66007", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "202", "power_mw": "101", "customer": "", "owner": "Flower Valley II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "940", "external_id": "66007", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Flower Valley II", "external_id": "66007", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 202, "power_mw": 101, "owner": "Flower Valley II", "status": "operation", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2022", "month": "4", "entity id": "65182", "entity name": "Flower Valley II", "plant producer type": "IPP", "plant name": "Flower Valley II", "plant state": "TX", "plant id": "66007", "generator id": "BA", "net summer capacity (mw)": "101", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66007", "date": "2022-04", "mw": 101}, "first_month": "2023-02", "changes": [], "current": {"year": "2022", "month": "4", "entity id": "65182", "entity name": "Flower Valley II", "plant producer type": "IPP", "plant name": "Flower Valley II", "plant state": "TX", "plant id": "66007", "generator id": "BA", "net summer capacity (mw)": "101", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66007", "date": "2022-04", "mw": 101}, "current_month": "2023-02", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 101, "mwh_is_estimate": true, "mwh": 202, "mwh_estimate": 202, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Flower Valley II", "name_short": "Flower Valley II", "owner": "Flower Valley II", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.193438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.193438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tranquility Storage Retrofit", "city": "Cantua Creek", "id": "69", "external_id": "59939", "state": "california", "country": "usa", "capacity_mwh": "288", "estimate_mwh": "", "power_mw": "72", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Powin", "type": "", "cells": "Mitsubishi", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-05-01", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.591626", "long": "-120.404965", "coords_hint": "1", "use_case": "200 MW solar farm support", "notes": "LFP batteries", "project_website": "", "link1": "https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "link2": "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref", "link3": "", "link4": ""}, "internal_id": "69", "external_id": "59939", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "RE Tranquillity", "external_id": "59939", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 144, "power_mw": 72, "owner": "Southern Power Co", "status": "operation", "date_first_heard": "2021-03", "start_construction": "2021-05", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2021", "month": "10", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Tranquillity", "plant state": "CA", "plant id": "59939", "generator id": "BESS1", "net summer capacity (mw)": "72", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "59939", "date": "2021-10", "mw": 72}, "first_month": "2021-03", "changes": [{"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 72, "to": 37, "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Tranquillity", "plant state": "CA", "plant id": "59939", "generator id": "BESS1", "net summer capacity (mw)": "37", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59939", "date": "2021-11", "mw": 37}, "current_month": "2022-02", "dates": {"first_heard": "2021-03", "start_construction": "2021-05"}, "month_disappeared": ""}, "BESS2": {"first": {"year": "2022", "month": "2", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Tranquillity", "plant state": "CA", "plant id": "59939", "generator id": "BESS2", "net summer capacity (mw)": "35", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "59939", "date": "2022-02", "mw": 35}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Tranquillity", "plant state": "CA", "plant id": "59939", "generator id": "BESS2", "net summer capacity (mw)": "35", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59939", "date": "2022-03", "mw": 35}, "current_month": "2023-02", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 72, "mwh_is_estimate": false, "mwh": 288, "mwh_estimate": 144, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-03", "start_construction": "2021-05", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "RE Tranquillity", "name_short": "RE Tranquillity", "owner": "Southern Power Co", "state": "california", "country": "usa", "lat": "36.591626", "long": "-120.404965", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.591626+-120.404965", "construction_time_month": 10, "construction_speed_mwh_per_month": 28, "no_of_battery_units": 0, "notes_split": ["LFP batteries"], "links": ["https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dodge Flat", "city": "", "id": "230", "external_id": "63913", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Dodge Flat Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "230", "external_id": "63913", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dodge Flat", "external_id": "63913", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Dodge Flat Solar, LLC", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2021-08", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DODGB": {"first": {"year": "2021", "month": "12", "entity id": "63578", "entity name": "Dodge Flat Solar, LLC", "plant producer type": "IPP", "plant name": "Dodge Flat", "plant state": "NV", "plant id": "63913", "generator id": "DODGB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63913", "date": "2021-12", "mw": 50}, "first_month": "2021-06", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "63578", "entity name": "Dodge Flat Solar, LLC", "plant producer type": "IPP", "plant name": "Dodge Flat", "plant state": "NV", "plant id": "63913", "generator id": "DODGB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63913", "date": "2022-03", "mw": 50}, "current_month": "2023-02", "dates": {"first_heard": "2021-06", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2021-08", "start_operation": "2022-03", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "Dodge Flat", "name_short": "Dodge Flat", "owner": "Dodge Flat Solar, LLC", "state": "nevada", "country": "usa", "lat": "41.543396", "long": "-114.96600600000001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.543396+-114.96600600000001", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fish Springs", "city": "", "id": "231", "external_id": "64148", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Fish Springs Ranch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "231", "external_id": "64148", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Fish Springs", "external_id": "64148", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Fish Springs Ranch Solar, LLC", "status": "operation", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FISHB": {"first": {"year": "2021", "month": "12", "entity id": "63772", "entity name": "Fish Springs Ranch Solar, LLC", "plant producer type": "IPP", "plant name": "Fish Springs", "plant state": "NV", "plant id": "64148", "generator id": "FISHB", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64148", "date": "2021-12", "mw": 25}, "first_month": "2021-04", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-02", "to": "2022-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "63772", "entity name": "Fish Springs Ranch Solar, LLC", "plant producer type": "IPP", "plant name": "Fish Springs", "plant state": "NV", "plant id": "64148", "generator id": "FISHB", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64148", "date": "2022-03", "mw": 25}, "current_month": "2023-02", "dates": {"first_heard": "2021-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2022-03", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "Fish Springs", "name_short": "Fish Springs", "owner": "Fish Springs Ranch Solar, LLC", "state": "nevada", "country": "usa", "lat": "41.51805660646126", "long": "-114.9839926343362", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.51805660646126+-114.9839926343362", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wheatridge Hybrid", "city": "", "id": "239", "external_id": "62745", "state": "oregon", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Wheatridge Wind Holdings, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "239", "external_id": "62745", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wheatridge Hybrid", "external_id": "62745", "state": "oregon", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Wheatridge Wind Holdings, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-12", "start_operation": "2022-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BTRY": {"first": {"year": "2021", "month": "12", "entity id": "62668", "entity name": "Wheatridge Wind Energy, LLC", "plant producer type": "IPP", "plant name": "Wheatridge Hybrid", "plant state": "OR", "plant id": "62745", "generator id": "BTRY", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62745", "date": "2021-12", "mw": 30}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "entity name", "from": "Wheatridge Wind Energy, LLC", "to": "Wheatridge Wind Holdings, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-12", "to": "2022-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "3", "entity id": "62668", "entity name": "Wheatridge Wind Holdings, LLC", "plant producer type": "IPP", "plant name": "Wheatridge Hybrid", "plant state": "OR", "plant id": "62745", "generator id": "BTRY", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62745", "date": "2022-03", "mw": 30}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-12"}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-12", "start_operation": "2022-03", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "Wheatridge Hybrid", "name_short": "Wheatridge", "owner": "Wheatridge Wind Holdings, LLC", "state": "oregon", "country": "usa", "lat": "45.52252661545126", "long": "-117.89061341879585", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:45.52252661545126+-117.89061341879585", "construction_time_month": 3, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Liverpool Energy Management Facility", "city": "", "id": "414", "external_id": "7772", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statkraft UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "414", "external_id": "7772", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Liverpool Energy Management Facility", "external_id": "7772", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statkraft UK", "status": "operation", "date_first_heard": "2020-06-17", "start_construction": "2021-10-01", "start_operation": "2022-03-01", "start_estimated": "", "month_disappeared": "", "lat": "53.419914", "long": "-2.927592", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7772", "Record Last Updated (dd/mm/yyyy)": "23/09/2020", "Operator (or Applicant)": "Statkraft UK", "Site Name": "Liverpool Energy Management Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To The South Of, Carnegie Road, Liverpool, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338451", "Y-coordinate": "391858", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "20F/0550", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/06/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/06/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419914", "long": "-2.927592", "status": "planning", "mw": 49, "ext_id": "7772"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Land To The South Of, Carnegie Road, Liverpool, Merseyside", "to": "Land To The South Of, Carnegie Road, Liverpool,", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/09/2020", "to": "22/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2021", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/03/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/06/2023", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7772", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Statkraft UK", "Site Name": "Liverpool Energy Management Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South Of, Carnegie Road, Liverpool,", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338451", "Y-coordinate": "391858", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "20F/0550", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/06/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/06/2023", "Under Construction": "01/10/2021", "Operational": "01/03/2022", "Heat Network Ref": "", "lat": "53.419914", "long": "-2.927592", "status": "operation", "mw": 49, "ext_id": "7772"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-23", "start_construction": "", "start_operation": "2023-06-22"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-06-17", "start_construction": "2021-10-01", "start_operation": "2022-03-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-03", "go_live_year_int": 2022, "name": "Liverpool Energy Management Facility", "name_short": "Liverpool Energy Management Facilit...", "owner": "Statkraft UK", "state": "north west", "country": "uk", "lat": "53.419914", "long": "-2.927592", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419914+-2.927592", "construction_time_month": 5, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kearny North Energy Storage", "city": "", "id": "202", "external_id": "64612", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "202", "external_id": "64612", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kearny North Energy Storage", "external_id": "64612", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2021-07", "start_operation": "2022-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KNES": {"first": {"year": "2021", "month": "6", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Kearny North Energy Storage", "plant state": "CA", "plant id": "64612", "generator id": "KNES", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64612", "date": "2021-06", "mw": 10}, "first_month": "2021-06", "changes": [{"month": "2021-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "2", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Kearny North Energy Storage", "plant state": "CA", "plant id": "64612", "generator id": "KNES", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64612", "date": "2022-02", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2021-06", "start_construction": "2021-07"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2021-07", "start_operation": "2022-02", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2022-02", "go_live_year_int": 2022, "name": "Kearny North Energy Storage", "name_short": "Kearny North", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.148539551100875", "long": "-121.26445225224751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.148539551100875+-121.26445225224751", "construction_time_month": 7, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kearny South Energy Storage", "city": "", "id": "203", "external_id": "64614", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "203", "external_id": "64614", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kearny South Energy Storage", "external_id": "64614", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2021-07", "start_operation": "2022-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KSES": {"first": {"year": "2021", "month": "6", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Kearny South Energy Storage", "plant state": "CA", "plant id": "64614", "generator id": "KSES", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64614", "date": "2021-06", "mw": 10}, "first_month": "2021-06", "changes": [{"month": "2021-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "2", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Kearny South Energy Storage", "plant state": "CA", "plant id": "64614", "generator id": "KSES", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64614", "date": "2022-02", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2021-06", "start_construction": "2021-07"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2021-07", "start_operation": "2022-02", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2022-02", "go_live_year_int": 2022, "name": "Kearny South Energy Storage", "name_short": "Kearny South", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.17607212162875", "long": "-121.2612551733487", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17607212162875+-121.2612551733487", "construction_time_month": 7, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alaska Soldotna", "city": "Soldotna Power Plant", "id": "23", "external_id": "57206", "state": "alaska", "country": "usa", "capacity_mwh": "93", "estimate_mwh": "", "power_mw": "46", "customer": "Homer Electric Association", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "37", "status": "operation", "date_first_heard": "2019-12-03", "start_construction": "", "start_operation": "2021-07-23", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "60.500441", "long": "-150.996312", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "link2": "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/", "link3": "", "link4": ""}, "internal_id": "23", "external_id": "57206", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Soldotna", "external_id": "57206", "state": "alaska", "country": "usa", "mwh": 0, "estimate_mwh": 92, "power_mw": 46, "owner": "Homer Electric Assn Inc", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"3": {"first": {"year": "2021", "month": "9", "entity id": "19558", "entity name": "Homer Electric Assn Inc", "plant producer type": "Electric Utility", "plant name": "Soldotna", "plant state": "AK", "plant id": "57206", "generator id": "3", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57206", "date": "2021-09", "mw": 46}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "1", "entity id": "19558", "entity name": "Homer Electric Assn Inc", "plant producer type": "Electric Utility", "plant name": "Soldotna", "plant state": "AK", "plant id": "57206", "generator id": "3", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57206", "date": "2022-01", "mw": 46}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 46, "mwh_is_estimate": false, "mwh": 93, "mwh_estimate": 92, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-01", "go_live_year_int": 2022, "name": "Soldotna", "name_short": "Soldotna", "owner": "Homer Electric Assn Inc", "state": "alaska", "country": "usa", "lat": "60.500441", "long": "-150.996312", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:60.500441+-150.996312", "construction_time_month": 14, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 37, "notes_split": [""], "links": ["https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Searcy Solar Hybrid", "city": "", "id": "143", "external_id": "62617", "state": "arkansas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Searcy Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "143", "external_id": "62617", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Searcy Solar Hybrid", "external_id": "62617", "state": "arkansas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Searcy Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-02", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SEABT": {"first": {"year": "2021", "month": "12", "entity id": "62109", "entity name": "Searcy Solar, LLC", "plant producer type": "IPP", "plant name": "Searcy Solar Hybrid", "plant state": "AR", "plant id": "62617", "generator id": "SEABT", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62617", "date": "2021-12", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "1", "entity id": "62109", "entity name": "Searcy Solar, LLC", "plant producer type": "IPP", "plant name": "Searcy Solar Hybrid", "plant state": "AR", "plant id": "62617", "generator id": "SEABT", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62617", "date": "2022-01", "mw": 10}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-02"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-02", "start_operation": "2022-01", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2022-01", "go_live_year_int": 2022, "name": "Searcy Solar Hybrid", "name_short": "Searcy Solar", "owner": "Searcy Solar, LLC", "state": "arkansas", "country": "usa", "lat": "36.16040548117874", "long": "-91.0622543531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.16040548117874+-91.0622543531653", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Victorian Big Battery", "city": "geelong", "id": "2", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "450", "estimate_mwh": "", "power_mw": "300", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "212", "status": "operation", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.037741", "long": "144.290949", "coords_hint": "1", "use_case": "", "notes": "incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ** 2021-09-03 moving project back to construction", "project_website": "https://victorianbigbattery.com.au/", "link1": "https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "link2": "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "link3": "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "link4": "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"}, "internal_id": "2", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 300, "mwh_is_estimate": false, "mwh": 450, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Victorian Big Battery", "name_short": "Victorian Big Battery", "owner": "", "state": "victoria", "country": "australia", "lat": "-38.037741", "long": "144.290949", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-38.037741+144.290949", "construction_time_month": 11, "construction_speed_mwh_per_month": 40, "no_of_battery_units": 212, "notes_split": ["incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ", " 2021-09-03 moving project back to construction"], "links": ["https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wallgrove Grid Battery", "city": "Wallgrove / Sydney", "id": "12", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "75", "estimate_mwh": "", "power_mw": "50", "customer": "TransGrid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "cost_million": "65", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-33.817659", "long": "150.828087", "coords_hint": "1", "use_case": "FCAS, synthetic inertia", "notes": "", "project_website": "https://www.transgrid.com.au/wallgrovebattery", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "link2": "https://arena.gov.au/projects/transgrid-wallgrove-battery/", "link3": "", "link4": ""}, "internal_id": "12", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 75, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Wallgrove Grid Battery", "name_short": "Wallgrove Grid Battery", "owner": "", "state": "new south wales", "country": "australia", "lat": "-33.817659", "long": "150.828087", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.817659+150.828087", "construction_time_month": 10, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "https://arena.gov.au/projects/transgrid-wallgrove-battery/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Garland Storage Retrofit", "city": "Kern County", "id": "70", "external_id": "60233", "state": "california", "country": "usa", "capacity_mwh": "352", "estimate_mwh": "", "power_mw": "88", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Powin", "type": "", "cells": "Mitsubishi", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-05-01", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.829699", "long": "-118.510184", "coords_hint": "1", "use_case": "200 MW solar farm support", "notes": "LFP batteries", "project_website": "https://www.southernpowercompany.com/content/dam/southernpower/pdfs/fact-sheets/Garland_Energy_Storage_factsheet.pdf", "link1": "https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "link2": "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref", "link3": "", "link4": ""}, "internal_id": "70", "external_id": "60233", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "RE Garland", "external_id": "60233", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 176, "power_mw": 88, "owner": "Southern Power Co", "status": "operation", "date_first_heard": "2021-03", "start_construction": "2021-05", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2021", "month": "8", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Garland", "plant state": "CA", "plant id": "60233", "generator id": "BESS1", "net summer capacity (mw)": "88", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "60233", "date": "2021-08", "mw": 88}, "first_month": "2021-03", "changes": [{"month": "2021-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 88, "to": 45, "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "8", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Garland", "plant state": "CA", "plant id": "60233", "generator id": "BESS1", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60233", "date": "2021-08", "mw": 45}, "current_month": "2022-02", "dates": {"first_heard": "2021-03", "start_construction": "2021-05"}, "month_disappeared": ""}, "BESS2": {"first": {"year": "2021", "month": "12", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Garland", "plant state": "CA", "plant id": "60233", "generator id": "BESS2", "net summer capacity (mw)": "43", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60233", "date": "2021-12", "mw": 43}, "first_month": "2022-02", "changes": [], "current": {"year": "2021", "month": "12", "entity id": "17650", "entity name": "Southern Power Co", "plant producer type": "IPP", "plant name": "RE Garland", "plant state": "CA", "plant id": "60233", "generator id": "BESS2", "net summer capacity (mw)": "43", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60233", "date": "2021-12", "mw": 43}, "current_month": "2022-02", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 88, "mwh_is_estimate": false, "mwh": 352, "mwh_estimate": 176, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-03", "start_construction": "2021-05", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "RE Garland", "name_short": "RE Garland", "owner": "Southern Power Co", "state": "california", "country": "usa", "lat": "34.829699", "long": "-118.510184", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.829699+-118.510184", "construction_time_month": 7, "construction_speed_mwh_per_month": 50, "no_of_battery_units": 0, "notes_split": ["LFP batteries"], "links": ["https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hudson - High Desert Hybrid", "city": "", "id": "180", "external_id": "64624", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Goldman Sachs Renewable Power Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "180", "external_id": "64624", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hudson - High Desert Hybrid", "external_id": "64624", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Goldman Sachs Renewable Power Group", "status": "operation", "date_first_heard": "2021-06", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2021", "month": "9", "entity id": "61944", "entity name": "Goldman Sachs Renewable Power Group", "plant producer type": "IPP", "plant name": "Hudson - High Desert Hybrid", "plant state": "CA", "plant id": "64624", "generator id": "BESS1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64624", "date": "2021-09", "mw": 50}, "first_month": "2021-06", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "61944", "entity name": "Goldman Sachs Renewable Power Group", "plant producer type": "IPP", "plant name": "Hudson - High Desert Hybrid", "plant state": "CA", "plant id": "64624", "generator id": "BESS1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64624", "date": "2021-12", "mw": 50}, "current_month": "2022-02", "dates": {"first_heard": "2021-06", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-06", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Hudson - High Desert Hybrid", "name_short": "Hudson - High Desert", "owner": "Goldman Sachs Renewable Power Group", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.140049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.140049", "construction_time_month": 4, "construction_speed_mwh_per_month": 25, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn E3 ", "city": "", "id": "192", "external_id": "64877", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "192", "external_id": "64877", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Edwards Sanborn E3", "external_id": "64877", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 26, "power_mw": 13, "owner": "Terra-Gen Operating Co-Hybrid", "status": "operation", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2021", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E3 ", "plant state": "CA", "plant id": "64877", "generator id": "BESS", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64877", "date": "2021-12", "mw": 12}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "plant name", "from": "Edwards Sanborn E3 ", "to": "Edwards Sanborn E3", "extra": "", "change_type": "misc"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 12, "to": 14, "extra": "", "change_type": "misc"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 14, "to": 13, "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "64366", "entity name": "Terra-Gen Operating Co-Hybrid", "plant producer type": "IPP", "plant name": "Edwards Sanborn E3", "plant state": "CA", "plant id": "64877", "generator id": "BESS", "net summer capacity (mw)": "13.7", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64877", "date": "2021-12", "mw": 13}, "current_month": "2022-02", "dates": {"first_heard": "2021-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 13, "mwh_is_estimate": true, "mwh": 26, "mwh_estimate": 26, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2021-12", "start_estimated": "2021-12", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Edwards Sanborn E3", "name_short": "Edwards Sanborn E3", "owner": "Terra-Gen Operating Co-Hybrid", "state": "california", "country": "usa", "lat": "40.99101310348649", "long": "-121.48126880673999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.99101310348649+-121.48126880673999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trenton", "city": "", "id": "208", "external_id": "63995", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Duke Energy Florida, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "208", "external_id": "63995", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Trenton", "external_id": "63995", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "Duke Energy Florida, LLC", "status": "operation", "date_first_heard": "2020-10", "start_construction": "", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ES1": {"first": {"year": "2021", "month": "6", "entity id": "6455", "entity name": "Duke Energy Florida, LLC", "plant producer type": "Electric Utility", "plant name": "Trenton", "plant state": "FL", "plant id": "63995", "generator id": "ES1", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63995", "date": "2021-06", "mw": 11}, "first_month": "2020-10", "changes": [{"month": "2021-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2022-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-01", "to": "2021-12", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "12", "entity id": "6455", "entity name": "Duke Energy Florida, LLC", "plant producer type": "Electric Utility", "plant name": "Trenton", "plant state": "FL", "plant id": "63995", "generator id": "ES1", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63995", "date": "2021-12", "mw": 11}, "current_month": "2022-02", "dates": {"first_heard": "2020-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10", "start_construction": "", "start_operation": "2021-12", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Trenton", "name_short": "Trenton", "owner": "Duke Energy Florida, LLC", "state": "florida", "country": "usa", "lat": "30.235434204403475", "long": "-82.28990899100998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.235434204403475+-82.28990899100998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cool Springs Solar (Hybrid)", "city": "", "id": "209", "external_id": "63721", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Cool Springs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "209", "external_id": "63721", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cool Springs Solar (Hybrid)", "external_id": "63721", "state": "georgia", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Cool Springs Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CSBAT": {"first": {"year": "2021", "month": "11", "entity id": "63414", "entity name": "Cool Springs Solar, LLC", "plant producer type": "IPP", "plant name": "Cool Springs Solar (Hybrid)", "plant state": "GA", "plant id": "63721", "generator id": "CSBAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63721", "date": "2021-11", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "63414", "entity name": "Cool Springs Solar, LLC", "plant producer type": "IPP", "plant name": "Cool Springs Solar (Hybrid)", "plant state": "GA", "plant id": "63721", "generator id": "CSBAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63721", "date": "2021-12", "mw": 40}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-12", "start_estimated": "2021-11", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Cool Springs Solar (Hybrid)", "name_short": "Cool Springs Solar (Hybrid)", "owner": "Cool Springs Solar, LLC", "state": "georgia", "country": "usa", "lat": "32.265775364886245", "long": "-82.18751619022643", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.265775364886245+-82.18751619022643", "construction_time_month": 11, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Townsite Solar Project Hybrid", "city": "", "id": "228", "external_id": "60654", "state": "nevada", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "180", "power_mw": "90", "customer": "Arevon", "owner": "Townsite Solar, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.935805", "long": "-114.869386", "coords_hint": "1", "use_case": "190MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesla.com/videos/townsite-solar-storage", "link2": "https://arevonenergy.com/location/townsite/", "link3": "", "link4": ""}, "internal_id": "228", "external_id": "60654", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Townsite Solar Project Hybrid", "external_id": "60654", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 180, "power_mw": 90, "owner": "Townsite Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2021", "month": "11", "entity id": "60387", "entity name": "Townsite Solar, LLC", "plant producer type": "IPP", "plant name": "Townsite Solar Project Hybrid", "plant state": "NV", "plant id": "60654", "generator id": "GEN02", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "60654", "date": "2021-11", "mw": 90}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "60387", "entity name": "Townsite Solar, LLC", "plant producer type": "IPP", "plant name": "Townsite Solar Project Hybrid", "plant state": "NV", "plant id": "60654", "generator id": "GEN02", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60654", "date": "2021-12", "mw": 90}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 90, "mwh_is_estimate": false, "mwh": 360, "mwh_estimate": 180, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "2021-11", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Townsite Solar Project Hybrid", "name_short": "Townsite Solar", "owner": "Townsite Solar, LLC", "state": "nevada", "country": "usa", "lat": "35.935805", "long": "-114.869386", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.935805+-114.869386", "construction_time_month": 4, "construction_speed_mwh_per_month": 90, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesla.com/videos/townsite-solar-storage", "https://arevonenergy.com/location/townsite/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Dunkirk 2", "city": "Dunkirk", "id": "258", "external_id": "", "state": "", "country": "france", "capacity_mwh": "31", "estimate_mwh": "", "power_mw": "31", "customer": "", "owner": "Total", "developer": "", "manufacturer": "Saft", "type": "Intensium Max 20 High Energy (20ft container)", "cells": "NMC", "no_of_battery_units": "16", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.030471", "long": "2.255373", "coords_hint": "2", "use_case": "", "notes": "saft is owned by total", "project_website": "", "link1": "https://www.energy-storage.news/frances-largest-battery-storage-facility-expanded-to-61mw-61mwh-as-second-phase-completed/", "link2": "", "link3": "", "link4": ""}, "internal_id": "258", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 31, "mwh_is_estimate": false, "mwh": 31, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-22", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Dunkirk 2", "name_short": "Dunkirk 2", "owner": "Total", "state": "", "country": "france", "lat": "51.030471", "long": "2.255373", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.030471+2.255373", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 16, "notes_split": ["saft is owned by total"], "links": ["https://www.energy-storage.news/frances-largest-battery-storage-facility-expanded-to-61mw-61mwh-as-second-phase-completed/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Severn Road", "city": "", "id": "332", "external_id": "7085", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "FPC Industry & Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "332", "external_id": "7085", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Severn Road", "external_id": "7085", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "FPC Industry & Enterprise", "status": "operation", "date_first_heard": "2017-12-22", "start_construction": "2021-08-01", "start_operation": "2021-12-23", "start_estimated": "", "month_disappeared": "", "lat": "51.518327", "long": "-2.660396", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7085", "Record Last Updated (dd/mm/yyyy)": "30/07/2020", "Operator (or Applicant)": "FPC Industry & Enterprise", "Site Name": "Severn Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "18.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At, Severn Road, Hallen, Bristol, Avon", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS10 7RZ", "X-coordinate": "354274", "Y-coordinate": "180141", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "PT17/4664/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.518327", "long": "-2.660396", "status": "planning", "mw": 18, "ext_id": "7085"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/07/2020", "to": "10/01/2022", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "18.00", "to": "32.00", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land At, Severn Road, Hallen, Bristol, Avon", "to": "Land At, Severn Road, Hallen, Bristol", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/08/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 18, "to": 32, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2022", "to": "13/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "23/12/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/10/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "13/10/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7085", "Record Last Updated (dd/mm/yyyy)": "13/10/2022", "Operator (or Applicant)": "FPC Industry & Enterprise", "Site Name": "Severn Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At, Severn Road, Hallen, Bristol", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS10 7RZ", "X-coordinate": "354274", "Y-coordinate": "180141", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "PT17/4664/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/08/2021", "Operational": "23/12/2021", "Heat Network Ref": "", "lat": "51.518327", "long": "-2.660396", "status": "operation", "mw": 32, "ext_id": "7085"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-30", "start_construction": "2022-01-10", "start_operation": "2022-10-13"}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-12-22", "start_construction": "2021-08-01", "start_operation": "2021-12-23", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Severn Road", "name_short": "Severn Road", "owner": "FPC Industry & Enterprise", "state": "south west", "country": "uk", "lat": "51.518327", "long": "-2.660396", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.518327+-2.660396", "construction_time_month": 4, "construction_speed_mwh_per_month": 8, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batterie Breitenworbis", "city": "", "id": "566", "external_id": "SEE977720016904", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "566", "external_id": "SEE977720016904", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batterie Breitenworbis", "external_id": "SEE977720016904", "state": "thuringia", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "VERBUND Energy4Business Germany GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": "", "month_disappeared": "", "lat": "51.416043", "long": "10.460464", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4750172"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE977720016904", "DatumLetzteAktualisierung": "2022-01-13T15:42:14.5435034", "LokationMaStRNummer": "SEL901333602698", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-01-13", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1415", "Landkreis": "Eichsfeld", "Gemeinde": "Breitenworbis", "Gemeindeschluessel": "16061017", "Postleitzahl": "37339", "Gemarkung": "37339 Breitenworbis", "FlurFlurstuecknummern": "Flur: 1; Flurst\u00fcck: 32/5", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Breitenworbis", "Laengengrad": "10.460464", "Breitengrad": "51.416043", "Registrierungsdatum": "2022-01-13", "Inbetriebnahmedatum": "2021-12-16", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Breitenworbis", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE937542481601", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4750172", "mwh": 10, "owner": "VERBUND Energy4Business Germany GmbH", "ext_id": "SEE977720016904", "mw": 10, "status": "operation"}, "first_month": "2022-01", "changes": [{"month": "2022-12", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2022-01-13", "to": "2022-11-09", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE977720016904", "DatumLetzteAktualisierung": "2022-01-13T15:42:14.5435034", "LokationMaStRNummer": "SEL901333602698", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-11-09", "AnlagenbetreiberMastrNummer": "ABR932212103470", "Land": "84", "Bundesland": "1415", "Landkreis": "Eichsfeld", "Gemeinde": "Breitenworbis", "Gemeindeschluessel": "16061017", "Postleitzahl": "37339", "Gemarkung": "37339 Breitenworbis", "FlurFlurstuecknummern": "Flur: 1; Flurst\u00fcck: 32/5", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Breitenworbis", "Laengengrad": "10.460464", "Breitengrad": "51.416043", "Registrierungsdatum": "2022-01-13", "Inbetriebnahmedatum": "2021-12-16", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batterie Breitenworbis", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE937542481601", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4750172", "owner": "VERBUND Energy4Business Germany GmbH", "mwh": 10, "ext_id": "SEE977720016904", "mw": 10, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Batterie Breitenworbis", "name_short": "Batterie Breitenworbis", "owner": "VERBUND Energy4Business Germany GmbH", "state": "thuringia", "country": "germany", "lat": "51.416043", "long": "10.460464", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.416043+10.460464", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4750172"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Manatee", "city": "Parrish / Manatee County", "id": "71", "external_id": "60014", "state": "florida", "country": "usa", "capacity_mwh": "900", "estimate_mwh": "", "power_mw": "409", "customer": "Florida Power and Light (FPL)", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-03-01", "start_construction": "2021-02-02", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "27.598383", "long": "-82.349213", "coords_hint": "1", "use_case": "solar farm support", "notes": "Already 75% complete in August 2021, 132 shipping containers", "project_website": "", "link1": "https://www.world-energy.org/article/19846.html", "link2": "https://www.youtube.com/watch?v=ZYbvXAS9buQ", "link3": "https://www.energy-storage.news/work-begins-on-409mw-900mwh-florida-battery-project-to-ease-natural-gas-plants-into-retirement/", "link4": ""}, "internal_id": "71", "external_id": "60014", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Manatee Solar Energy Center", "external_id": "60014", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 818, "power_mw": 409, "owner": "Florida Power & Light Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BMS": {"first": {"year": "2021", "month": "11", "entity id": "6452", "entity name": "Florida Power & Light Co", "plant producer type": "Electric Utility", "plant name": "Manatee Solar Energy Center", "plant state": "FL", "plant id": "60014", "generator id": "BMS", "net summer capacity (mw)": "409", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "60014", "date": "2021-11", "mw": 409}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "6452", "entity name": "Florida Power & Light Co", "plant producer type": "Electric Utility", "plant name": "Manatee Solar Energy Center", "plant state": "FL", "plant id": "60014", "generator id": "BMS", "net summer capacity (mw)": "409", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60014", "date": "2021-11", "mw": 409}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 409, "mwh_is_estimate": false, "mwh": 900, "mwh_estimate": 818, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "go_live": "2021-11", "go_live_year_int": 2021, "name": "Manatee Solar Energy Center", "name_short": "Manatee Solar", "owner": "Florida Power & Light Co", "state": "florida", "country": "usa", "lat": "27.598383", "long": "-82.349213", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:27.598383+-82.349213", "construction_time_month": 10, "construction_speed_mwh_per_month": 90, "no_of_battery_units": 0, "notes_split": ["Already 75% complete in August 2021, 132 shipping containers"], "links": ["https://www.world-energy.org/article/19846.html", "https://www.youtube.com/watch?v=ZYbvXAS9buQ", "https://www.energy-storage.news/work-begins-on-409mw-900mwh-florida-battery-project-to-ease-natural-gas-plants-into-retirement/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sanborn BESS 2", "city": "", "id": "172", "external_id": "64713", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "172", "external_id": "64713", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sanborn BESS 2", "external_id": "64713", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Terra-Gen Operating Co-BESS", "status": "operation", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ESSB2": {"first": {"year": "2021", "month": "8", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 2", "plant state": "CA", "plant id": "64713", "generator id": "ESSB2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64713", "date": "2021-08", "mw": 100}, "first_month": "2021-07", "changes": [{"month": "2021-09", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 2", "plant state": "CA", "plant id": "64713", "generator id": "ESSB2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64713", "date": "2021-11", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2021-11", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2021-11", "go_live_year_int": 2021, "name": "Sanborn BESS 2", "name_short": "Sanborn BESS 2", "owner": "Terra-Gen Operating Co-BESS", "state": "california", "country": "usa", "lat": "41.01452451357819", "long": "-121.448908126965", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01452451357819+-121.448908126965", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cal Flats BESS", "city": "", "id": "176", "external_id": "63930", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "CD Arevon USA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "176", "external_id": "63930", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cal Flats BESS", "external_id": "63930", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "CD Arevon USA, Inc.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CF60": {"first": {"year": "2021", "month": "6", "entity id": "63600", "entity name": "Cal Flats BESS, LLC", "plant producer type": "IPP", "plant name": "Cal Flats BESS", "plant state": "CA", "plant id": "63930", "generator id": "CF60", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63930", "date": "2021-06", "mw": 60}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "entity id", "from": "63600", "to": "61230", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Cal Flats BESS, LLC", "to": "CD Arevon USA, Inc.", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-06", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "61230", "entity name": "CD Arevon USA, Inc.", "plant producer type": "IPP", "plant name": "Cal Flats BESS", "plant state": "CA", "plant id": "63930", "generator id": "CF60", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63930", "date": "2021-11", "mw": 60}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-04"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2021-11", "start_estimated": "2021-10", "month_disappeared": "", "go_live": "2021-11", "go_live_year_int": 2021, "name": "Cal Flats BESS", "name_short": "Cal Flats", "owner": "CD Arevon USA, Inc.", "state": "california", "country": "usa", "lat": "40.86398962756772", "long": "-121.21599637753002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.86398962756772+-121.21599637753002", "construction_time_month": 7, "construction_speed_mwh_per_month": 17, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Henrietta D Energy Storage LLC", "city": "", "id": "196", "external_id": "60641", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Convergent Energy and Power LP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "196", "external_id": "60641", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Henrietta D Energy Storage LLC", "external_id": "60641", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Convergent Energy and Power LP", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2021-11", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HDES1": {"first": {"year": "2021", "month": "1", "entity id": "61978", "entity name": "Convergent Energy and Power LP", "plant producer type": "IPP", "plant name": "Henrietta D Energy Storage LLC", "plant state": "CA", "plant id": "60641", "generator id": "HDES1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "60641", "date": "2021-01", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "date", "from": "2021-01", "to": "2021-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2020-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-01", "li": [{"name": "date", "from": "2021-03", "to": "2021-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-04", "to": "2021-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "11", "entity id": "61978", "entity name": "Convergent Energy and Power LP", "plant producer type": "IPP", "plant name": "Henrietta D Energy Storage LLC", "plant state": "CA", "plant id": "60641", "generator id": "HDES1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60641", "date": "2021-11", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-12"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2021-11", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-11", "go_live_year_int": 2021, "name": "Henrietta D Energy Storage LLC", "name_short": "Henrietta D Energy Storage", "owner": "Convergent Energy and Power LP", "state": "california", "country": "usa", "lat": "40.82594736691591", "long": "-121.20363569775502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.82594736691591+-121.20363569775502", "construction_time_month": 11, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mustang", "city": "Kings County", "id": "74", "external_id": "59150", "state": "california", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "75", "customer": "Recurrent Energy / Goldman Sachs Renewables Power (GSRP)", "owner": "", "developer": "", "manufacturer": "byd", "type": "", "cells": "LFP", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.245785", "long": "-119.904115", "coords_hint": "0", "use_case": "100MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/mustang-solar-storage/", "link1": "https://www.energy-storage.news/canadian-solar-will-retrofit-300mwh-of-batteries-at-goldman-sachss-mustang-solar-plant-california/", "link2": "", "link3": "", "link4": ""}, "internal_id": "74", "external_id": "59150", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "RE Mustang LLC", "external_id": "59150", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Goldman Sachs Renewable Power Group", "status": "operation", "date_first_heard": "2021-07", "start_construction": "2021-09", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2021", "month": "10", "entity id": "61944", "entity name": "Goldman Sachs Renewable Power Group", "plant producer type": "IPP", "plant name": "RE Mustang LLC", "plant state": "CA", "plant id": "59150", "generator id": "BESS1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "59150", "date": "2021-10", "mw": 75}, "first_month": "2021-07", "changes": [{"month": "2021-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "61944", "entity name": "Goldman Sachs Renewable Power Group", "plant producer type": "IPP", "plant name": "RE Mustang LLC", "plant state": "CA", "plant id": "59150", "generator id": "BESS1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "59150", "date": "2021-10", "mw": 75}, "current_month": "2022-02", "dates": {"first_heard": "2021-07", "start_construction": "2021-09"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 150, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "2021-09", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "RE Mustang LLC", "name_short": "RE Mustang", "owner": "Goldman Sachs Renewable Power Group", "state": "california", "country": "usa", "lat": "36.245785", "long": "-119.904115", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.245785+-119.904115", "construction_time_month": 1, "construction_speed_mwh_per_month": 300, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/canadian-solar-will-retrofit-300mwh-of-batteries-at-goldman-sachss-mustang-solar-plant-california/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Permian Energy Center", "city": "Andrews Country", "id": "88", "external_id": "63255", "state": "texas", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "40", "customer": "ExxonMobil", "owner": "Orsted", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-11-01", "start_operation": "2021-05-04", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.121853", "long": "-102.529659", "coords_hint": "1", "use_case": "420MW solar farm support", "notes": "built on a depleted oil field in the Permian Basin ** 2018: 12 year PPA with Exxon Mobil ** got exact location from the 2020 amended agreement doc on texas.gov site", "project_website": "https://orsted.com/en/our-business/solar-and-battery-storage/our-solar-and-storage-centers", "link1": "https://orsted.com/en/media/newsroom/news/2021/05/885212783010106", "link2": "https://www.nsenergybusiness.com/projects/permian-energy-centre/#", "link3": "https://comptroller.texas.gov/economy/local/ch313/agreement-docs-details.php?id=1411", "link4": ""}, "internal_id": "88", "external_id": "63255", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "2W Permian Solar Project Hybrid", "external_id": "63255", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "2W Permian Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"2WPBA": {"first": {"year": "2021", "month": "5", "entity id": "63012", "entity name": "2W Permian Solar, LLC", "plant producer type": "IPP", "plant name": "2W Permian Solar Project Hybrid", "plant state": "TX", "plant id": "63255", "generator id": "2WPBA", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63255", "date": "2021-05", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-07", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-05", "to": "2021-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "63012", "entity name": "2W Permian Solar, LLC", "plant producer type": "IPP", "plant name": "2W Permian Solar Project Hybrid", "plant state": "TX", "plant id": "63255", "generator id": "2WPBA", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63255", "date": "2021-10", "mw": 40}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2019-11-01", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "2W Permian Solar Project Hybrid", "name_short": "2W Permian Solar", "owner": "2W Permian Solar, LLC", "state": "texas", "country": "usa", "lat": "32.121853", "long": "-102.529659", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.121853+-102.529659", "construction_time_month": 23, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": ["built on a depleted oil field in the Permian Basin ", " 2018: 12 year PPA with Exxon Mobil ", " got exact location from the 2020 amended agreement doc on texas.gov site"], "links": ["https://orsted.com/en/media/newsroom/news/2021/05/885212783010106", "https://www.nsenergybusiness.com/projects/permian-energy-centre/#", "https://comptroller.texas.gov/economy/local/ch313/agreement-docs-details.php?id=1411"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bat Cave", "city": "Mason County", "id": "115", "external_id": "64312", "state": "texas", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-09-15", "start_operation": "", "start_estimated": "2021", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.7345278", "long": "-99.2311111", "coords_hint": "1", "use_case": "", "notes": "location verified from photo on broad reach power website", "project_website": "https://broadreachpower.com/projects/", "link1": "https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/", "link2": "", "link3": "", "link4": ""}, "internal_id": "115", "external_id": "64312", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bat Cave", "external_id": "64312", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Broad Reach Power", "status": "operation", "date_first_heard": "2021-02", "start_construction": "", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BC": {"first": {"year": "2021", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Bat Cave", "plant state": "TX", "plant id": "64312", "generator id": "BC", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64312", "date": "2021-06", "mw": 100}, "first_month": "2021-02", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Bat Cave", "plant state": "TX", "plant id": "64312", "generator id": "BC", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64312", "date": "2021-10", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02", "start_construction": "2020-09-15", "start_operation": "2021-10", "start_estimated": "2021", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Bat Cave", "name_short": "Bat Cave", "owner": "Broad Reach Power", "state": "texas", "country": "usa", "lat": "30.7345278", "long": "-99.2311111", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.7345278+-99.2311111", "construction_time_month": 13, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": ["location verified from photo on broad reach power website"], "links": ["https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Fork", "city": "Williamson County", "id": "116", "external_id": "64317", "state": "texas", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-09-15", "start_operation": "", "start_estimated": "2021", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.655335", "long": "-97.883739", "coords_hint": "0", "use_case": "", "notes": "location from the broad reach power website, but do not think it is correct", "project_website": "https://broadreachpower.com/projects/", "link1": "https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/", "link2": "", "link3": "", "link4": ""}, "internal_id": "116", "external_id": "64317", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "North Fork TX", "external_id": "64317", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Broad Reach Power", "status": "operation", "date_first_heard": "2021-02", "start_construction": "", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NF": {"first": {"year": "2021", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "North Fork TX", "plant state": "TX", "plant id": "64317", "generator id": "NF", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64317", "date": "2021-06", "mw": 100}, "first_month": "2021-02", "changes": [{"month": "2021-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "North Fork TX", "plant state": "TX", "plant id": "64317", "generator id": "NF", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64317", "date": "2021-10", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02", "start_construction": "2020-09-15", "start_operation": "2021-10", "start_estimated": "2021", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "North Fork TX", "name_short": "North Fork TX", "owner": "Broad Reach Power", "state": "texas", "country": "usa", "lat": "30.655335", "long": "-97.883739", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.655335+-97.883739", "construction_time_month": 13, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": ["location from the broad reach power website, but do not think it is correct"], "links": ["https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Energy Johanna Facility", "city": "", "id": "197", "external_id": "62889", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "197", "external_id": "62889", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Energy Johanna Facility", "external_id": "62889", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Hecate Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-10", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"HEGJF": {"first": {"year": "2021", "month": "1", "entity id": "62763", "entity name": "Hecate Grid, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Johanna Facility", "plant state": "CA", "plant id": "62889", "generator id": "HEGJF", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62889", "date": "2021-01", "mw": 20}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "date", "from": "2021-01", "to": "2021-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-04", "to": "2021-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "mw", "from": 20, "to": 10, "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "62763", "entity name": "Hecate Grid, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Johanna Facility", "plant state": "CA", "plant id": "62889", "generator id": "HEGJF", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62889", "date": "2021-10", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-10"}, "month_disappeared": ""}, "HJFII": {"first": {"year": "2021", "month": "1", "entity id": "62763", "entity name": "Hecate Grid, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Johanna Facility", "plant state": "CA", "plant id": "62889", "generator id": "HJFII", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62889", "date": "2021-01", "mw": 10}, "first_month": "2021-01", "changes": [{"month": "2021-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-01", "to": "2021-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-04", "to": "2021-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "62763", "entity name": "Hecate Grid, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Johanna Facility", "plant state": "CA", "plant id": "62889", "generator id": "HJFII", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62889", "date": "2021-10", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2021-01", "start_construction": "2021-02"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-10", "start_operation": "2021-10", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Hecate Energy Johanna Facility", "name_short": "Hecate Energy Johanna Facility", "owner": "Hecate Grid, LLC", "state": "california", "country": "usa", "lat": "40.85246532387877", "long": "-121.10372872573431", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.85246532387877+-121.10372872573431", "construction_time_month": 12, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chisholm Grid Energy Storage System", "city": "", "id": "243", "external_id": "63737", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Chisholm Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "243", "external_id": "63737", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Chisholm Grid Energy Storage System", "external_id": "63737", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Chisholm Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-10", "start_operation": "2021-10", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CHS01": {"first": {"year": "2021", "month": "7", "entity id": "63430", "entity name": "Astral Electricity, LLC", "plant producer type": "IPP", "plant name": "Chisholm Grid Energy Storage System", "plant state": "TX", "plant id": "63737", "generator id": "CHS01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63737", "date": "2021-07", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "entity name", "from": "Astral Electricity, LLC", "to": "Chisholm Grid, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2021-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "10", "entity id": "63430", "entity name": "Chisholm Grid, LLC", "plant producer type": "IPP", "plant name": "Chisholm Grid Energy Storage System", "plant state": "TX", "plant id": "63737", "generator id": "CHS01", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63737", "date": "2021-10", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-10"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-10", "start_operation": "2021-10", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Chisholm Grid Energy Storage System", "name_short": "Chisholm Grid", "owner": "Chisholm Grid, LLC", "state": "texas", "country": "usa", "lat": "33.572170481178745", "long": "-95.1876213531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.572170481178745+-95.1876213531653", "construction_time_month": 12, "construction_speed_mwh_per_month": 16, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mannington Battery Storage Plant", "city": "", "id": "307", "external_id": "7024", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Public Power Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "307", "external_id": "7024", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mannington Battery Storage Plant", "external_id": "7024", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Still Waters Green Technology", "status": "operation", "date_first_heard": "2018-02-28", "start_construction": "2020-11-01", "start_operation": "2021-10-01", "start_estimated": "", "month_disappeared": "", "lat": "51.553544", "long": "-1.814961", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7024", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Public Power Solutions", "Site Name": "Mannington Battery Storage Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Mannington Depot Telford Way, Service Road, Mannington, Swindon, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN5 8WA", "X-coordinate": "412926", "Y-coordinate": "183867", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/17/1879", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.553544", "long": "-1.814961", "status": "planning", "mw": 49, "ext_id": "7024"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2020", "to": "14/09/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Public Power Solutions", "to": "Still Waters Green Technology", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/02/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/11/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/09/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7024", "Record Last Updated (dd/mm/yyyy)": "14/09/2022", "Operator (or Applicant)": "Still Waters Green Technology", "Site Name": "Mannington Battery Storage Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Mannington Depot Telford Way, Service Road, Mannington, Swindon, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN5 8WA", "X-coordinate": "412926", "Y-coordinate": "183867", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/17/1879", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2021", "Under Construction": "01/11/2020", "Operational": "01/10/2021", "Heat Network Ref": "", "lat": "51.553544", "long": "-1.814961", "status": "operation", "mw": 49, "ext_id": "7024"}, "current_month": "2024-01", "dates": {"first_heard": "2020-05-27", "start_construction": "", "start_operation": "2022-09-14"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-02-28", "start_construction": "2020-11-01", "start_operation": "2021-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Mannington Battery Storage Plant", "name_short": "Mannington Battery Storage Plant", "owner": "Still Waters Green Technology", "state": "south west", "country": "uk", "lat": "51.553544", "long": "-1.814961", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.553544+-1.814961", "construction_time_month": 11, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitelee Wind Farm Battery Storage Extension", "city": "", "id": "359", "external_id": "7174", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "359", "external_id": "7174", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitelee Wind Farm Battery Storage Extension", "external_id": "7174", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "status": "operation", "date_first_heard": "2019-06-10", "start_construction": "2020-10-01", "start_operation": "2021-10-01", "start_estimated": "", "month_disappeared": "", "lat": "55.695517", "long": "-4.171399", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7174", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "Site Name": "Whitelee Wind Farm Battery Storage Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "3489", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Eaglesham Moor, Whitelee Forest, Fenwick Moor, East Kilbride, South of Glasgow", "County": "Renfrewshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "G76 0PW", "X-coordinate": "263618", "Y-coordinate": "646810", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000729", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/06/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.695517", "long": "-4.171399", "status": "planning", "mw": 50, "ext_id": "7174"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "21/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/02/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "21/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7174", "Record Last Updated (dd/mm/yyyy)": "21/02/2022", "Operator (or Applicant)": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "Site Name": "Whitelee Wind Farm Battery Storage Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "3489", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Eaglesham Moor, Whitelee Forest, Fenwick Moor, East Kilbride, South of Glasgow", "County": "Renfrewshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "G76 0PW", "X-coordinate": "263618", "Y-coordinate": "646810", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000729", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/06/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/10/2020", "Operational": "01/10/2021", "Heat Network Ref": "", "lat": "55.695517", "long": "-4.171399", "status": "operation", "mw": 50, "ext_id": "7174"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": "2022-02-21"}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-06-10", "start_construction": "2020-10-01", "start_operation": "2021-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Whitelee Wind Farm Battery Storage Extension", "name_short": "Whitelee Wind Farm Battery Storage ...", "owner": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "state": "scotland", "country": "uk", "lat": "55.695517", "long": "-4.171399", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.695517+-4.171399", "construction_time_month": 12, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stonehill Energy Storage", "city": "", "id": "412", "external_id": "7773", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-02-24", "start_construction": "2021-06-09", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "412", "external_id": "7773", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stonehill Energy Storage", "external_id": "7773", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Penso Power", "status": "operation", "date_first_heard": "2020-02-24", "start_construction": "2021-06-09", "start_operation": "2021-10-09", "start_estimated": "", "month_disappeared": "", "lat": "51.605336", "long": "-2.004009", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7773", "Record Last Updated (dd/mm/yyyy)": "29/06/2020", "Operator (or Applicant)": "Penso Power", "Site Name": "Stonehill Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP", "X-coordinate": "399819", "Y-coordinate": "189611", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/11460/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/02/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "09/06/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.605336", "long": "-2.004009", "status": "construction", "mw": 50, "ext_id": "7773"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/06/2020", "to": "01/11/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "09/10/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2022-04", "li": [{"name": "Address", "from": "Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury, Wiltshire", "to": "Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury,", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2021", "to": "09/10/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7773", "Record Last Updated (dd/mm/yyyy)": "09/10/2021", "Operator (or Applicant)": "Penso Power", "Site Name": "Stonehill Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury,", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP", "X-coordinate": "399819", "Y-coordinate": "189611", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/11460/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/02/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "09/06/2021", "Operational": "09/10/2021", "Heat Network Ref": "", "lat": "51.605336", "long": "-2.004009", "status": "operation", "mw": 50, "ext_id": "7773"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-29", "start_construction": "", "start_operation": "2021-11-01"}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-02-24", "start_construction": "2021-06-09", "start_operation": "2021-10-09", "start_estimated": "", "month_disappeared": "", "go_live": "2021-10", "go_live_year_int": 2021, "name": "Stonehill Energy Storage", "name_short": "Stonehill", "owner": "Penso Power", "state": "south west", "country": "uk", "lat": "51.605336", "long": "-2.004009", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.605336+-2.004009", "construction_time_month": 4, "construction_speed_mwh_per_month": 12, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Contego", "city": "Hurstpierpoint", "id": "35", "external_id": "", "state": "west sussex", "country": "uk", "capacity_mwh": "68", "estimate_mwh": "", "power_mw": "34", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "28", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.955104", "long": "-0.163008", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.harmonyenergy.co.uk/projects/", "link1": "https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "link2": "https://www.youtube.com/watch?v=zh6PFeObrHs", "link3": "", "link4": ""}, "internal_id": "35", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 34, "mwh_is_estimate": false, "mwh": 68, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Contego", "name_short": "Contego", "owner": "", "state": "west sussex", "country": "uk", "lat": "50.955104", "long": "-0.163008", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.955104+-0.163008", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 28, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "https://www.youtube.com/watch?v=zh6PFeObrHs"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Agua Fria / Bolster Substation", "city": "Glendale / Phoenix", "id": "111", "external_id": "141", "state": "arizona", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "Salt River Project (SRP)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "32", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.553691", "long": "-112.212654", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "link2": "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/", "link3": "", "link4": ""}, "internal_id": "111", "external_id": "141", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Agua Fria", "external_id": "141", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Salt River Project", "status": "operation", "date_first_heard": "2021-10", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AFSB1": {"first": {"year": "2021", "month": "9", "entity id": "16572", "entity name": "Salt River Project", "plant producer type": "Electric Utility", "plant name": "Agua Fria", "plant state": "AZ", "plant id": "141", "generator id": "AFSB1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "141", "date": "2021-09", "mw": 25}, "first_month": "2021-10", "changes": [{"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-10", "to": "2021-09", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "9", "entity id": "16572", "entity name": "Salt River Project", "plant producer type": "Electric Utility", "plant name": "Agua Fria", "plant state": "AZ", "plant id": "141", "generator id": "AFSB1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "141", "date": "2021-09", "mw": 25}, "current_month": "2022-02", "dates": {"first_heard": "2021-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-10", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Agua Fria", "name_short": "Agua Fria", "owner": "Salt River Project", "state": "arizona", "country": "usa", "lat": "33.553691", "long": "-112.212654", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.553691+-112.212654", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 32, "notes_split": [""], "links": ["https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Mohammed bin Rashid Al Maktoum Solar Park", "city": "Dubai", "id": "118", "external_id": "", "state": "", "country": "uae", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "1", "customer": "", "owner": "Dubai Electricity and Water Authority (DEWA)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.765375", "long": "55.367443", "coords_hint": "0", "use_case": "1000MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "link2": "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/", "link3": "", "link4": ""}, "internal_id": "118", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 1, "mwh_is_estimate": false, "mwh": 8, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Mohammed bin Rashid Al Maktoum Solar Park", "name_short": "Mohammed bin Rashid Al Maktoum Sola...", "owner": "Dubai Electricity and Water Authority (DEWA)", "state": "", "country": "uae", "lat": "24.765375", "long": "55.367443", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:24.765375+55.367443", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Sanborn BESS 1", "city": "", "id": "171", "external_id": "64712", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "171", "external_id": "64712", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sanborn BESS 1", "external_id": "64712", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Terra-Gen Operating Co-BESS", "status": "operation", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ESSB1": {"first": {"year": "2021", "month": "8", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 1", "plant state": "CA", "plant id": "64712", "generator id": "ESSB1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64712", "date": "2021-08", "mw": 100}, "first_month": "2021-07", "changes": [{"month": "2021-09", "li": [{"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2021-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "9", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Sanborn BESS 1", "plant state": "CA", "plant id": "64712", "generator id": "ESSB1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64712", "date": "2021-09", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-07", "start_construction": "", "start_operation": "2021-09", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Sanborn BESS 1", "name_short": "Sanborn BESS 1", "owner": "Terra-Gen Operating Co-BESS", "state": "california", "country": "usa", "lat": "41.07261624691126", "long": "-121.45412015563981", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.07261624691126+-121.45412015563981", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lily Solar Hybrid", "city": "", "id": "251", "external_id": "63892", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Lily Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "251", "external_id": "63892", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lily Solar Hybrid", "external_id": "63892", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Lily Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LILYB": {"first": {"year": "2021", "month": "6", "entity id": "63549", "entity name": "Lily Solar, LLC", "plant producer type": "IPP", "plant name": "Lily Solar Hybrid", "plant state": "TX", "plant id": "63892", "generator id": "LILYB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63892", "date": "2021-06", "mw": 50}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "date", "from": "2021-06", "to": "2021-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-08", "to": "2021-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "9", "entity id": "63549", "entity name": "Lily Solar, LLC", "plant producer type": "IPP", "plant name": "Lily Solar Hybrid", "plant state": "TX", "plant id": "63892", "generator id": "LILYB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63892", "date": "2021-09", "mw": 50}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-09", "start_estimated": "2021-09", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Lily Solar Hybrid", "name_short": "Lily Solar", "owner": "Lily Solar, LLC", "state": "texas", "country": "usa", "lat": "33.416353926686256", "long": "-95.389466894988", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.416353926686256+-95.389466894988", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McCoy Storage Project", "city": "Riverside County", "id": "66", "external_id": "58462", "state": "california", "country": "usa", "capacity_mwh": "920", "estimate_mwh": "", "power_mw": "230", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.664118", "long": "-114.749852", "coords_hint": "1", "use_case": "250MW solar farm support", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "", "link3": "", "link4": ""}, "internal_id": "66", "external_id": "58462", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McCoy Solar Energy Project Hybrid", "external_id": "58462", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 460, "power_mw": 230, "owner": "McCoy Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2021-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MCST1": {"first": {"year": "2021", "month": "7", "entity id": "58451", "entity name": "McCoy Solar, LLC", "plant producer type": "IPP", "plant name": "McCoy Solar Energy Project Hybrid", "plant state": "CA", "plant id": "58462", "generator id": "MCST1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58462", "date": "2021-07", "mw": 230}, "first_month": "2020-09", "changes": [{"month": "2021-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "7", "entity id": "58451", "entity name": "McCoy Solar, LLC", "plant producer type": "IPP", "plant name": "McCoy Solar Energy Project Hybrid", "plant state": "CA", "plant id": "58462", "generator id": "MCST1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "58462", "date": "2021-07", "mw": 230}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-04"}, "month_disappeared": ""}}, "mw": 230, "mwh_is_estimate": false, "mwh": 920, "mwh_estimate": 460, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-04", "start_operation": "2021-07", "start_estimated": "", "month_disappeared": "", "go_live": "2021-07", "go_live_year_int": 2021, "name": "McCoy Solar Energy Project Hybrid", "name_short": "McCoy Solar Energy", "owner": "McCoy Solar, LLC", "state": "california", "country": "usa", "lat": "33.664118", "long": "-114.749852", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.664118+-114.749852", "construction_time_month": 3, "construction_speed_mwh_per_month": 306, "no_of_battery_units": 0, "notes_split": ["part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex"], "links": ["https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ringo-Vingeanne", "city": "Jalancourt", "id": "94", "external_id": "", "state": "Cote-d\u2019or", "country": "france", "capacity_mwh": "24", "estimate_mwh": "", "power_mw": "12", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Nidec ASI", "type": "40ft container", "cells": "LG Chem NMC", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-10-01", "start_operation": "2021-07-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "47.510967", "long": "5.367566", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "rte website and energy storage news list two different capacities for site ** exact location from rte press photo which is close to lake ** 2021: it is an expirment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/actualites/le-projet-ringo-de-rte-accueille-ses-premiers-equipements-en-cote-dor", "link3": "https://www.energy-storage.news/french-grid-operators-software-controlled-battery-experiment-begins/", "link4": ""}, "internal_id": "94", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 24, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2019-10-01", "start_operation": "2021-07-02", "start_estimated": "", "month_disappeared": "", "go_live": "2021-07", "go_live_year_int": 2021, "name": "Ringo-Vingeanne", "name_short": "Ringo-Vingeanne", "owner": "", "state": "Cote-d\u2019or", "country": "france", "lat": "47.510967", "long": "5.367566", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:47.510967+5.367566", "construction_time_month": 21, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": ["rte website and energy storage news list two different capacities for site ", " exact location from rte press photo which is close to lake ", " 2021: it is an expirment which lasts for 3 years"], "links": ["https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "https://www.rte-france.com/actualites/le-projet-ringo-de-rte-accueille-ses-premiers-equipements-en-cote-dor", "https://www.energy-storage.news/french-grid-operators-software-controlled-battery-experiment-begins/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gambit", "city": "angleton / houston", "id": "6", "external_id": "64528", "state": "texas", "country": "usa", "capacity_mwh": "175", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-08", "start_construction": "2021-03-08", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.168189", "long": "-95.445369", "coords_hint": "1", "use_case": "tesla as energy providor", "notes": "drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger", "project_website": "https://www.gambit-energystorage.com/", "link1": "https://www.teslarati.com/tesla-texas-big-battery-report/", "link2": "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "link3": "https://www.youtube.com/watch?v=OottNRdebs8", "link4": "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"}, "internal_id": "6", "external_id": "64528", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gambit Energy Storage - Angleton Storage", "external_id": "64528", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Tesla Inc.", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2021", "month": "6", "entity id": "60947", "entity name": "Tesla Inc.", "plant producer type": "IPP", "plant name": "Gambit Energy Storage - Angleton Storage", "plant state": "TX", "plant id": "64528", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64528", "date": "2021-06", "mw": 100}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "6", "entity id": "60947", "entity name": "Tesla Inc.", "plant producer type": "IPP", "plant name": "Gambit Energy Storage - Angleton Storage", "plant state": "TX", "plant id": "64528", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64528", "date": "2021-06", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-04", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 175, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Gambit Energy Storage - Angleton Storage", "name_short": "Gambit Energy Storage - Angleton", "owner": "Tesla Inc.", "state": "texas", "country": "usa", "lat": "29.168189", "long": "-95.445369", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:29.168189+-95.445369", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger"], "links": ["https://www.teslarati.com/tesla-texas-big-battery-report/", "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "https://www.youtube.com/watch?v=OottNRdebs8", "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Malita", "city": "Malita", "id": "77", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "6.398523", "long": "125.617282", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/fluence-completes-first-projects-in-470mw-470mwh-philippines-battery-order/", "link2": "", "link3": "", "link4": ""}, "internal_id": "77", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-09", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Malita", "name_short": "Malita", "owner": "", "state": "", "country": "philippines", "lat": "6.398523", "long": "125.617282", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:6.398523+125.617282", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/fluence-completes-first-projects-in-470mw-470mwh-philippines-battery-order/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Toledo", "city": "Toledo", "id": "78", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "10.388901", "long": "123.642096", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "link2": "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/", "link3": "", "link4": ""}, "internal_id": "78", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Toledo", "name_short": "Toledo", "owner": "", "state": "", "country": "philippines", "lat": "10.388901", "long": "123.642096", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:10.388901+123.642096", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Limay", "city": "Limay / Bataan", "id": "79", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "40", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "14.545475", "long": "120.599531", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "link2": "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/", "link3": "", "link4": ""}, "internal_id": "79", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 40, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Limay", "name_short": "Limay", "owner": "", "state": "", "country": "philippines", "lat": "14.545475", "long": "120.599531", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:14.545475+120.599531", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oxford Energy Superhub", "city": "Cowley / Oxford", "id": "91", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Pivot Power (EDF Renewables)", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.709722", "long": "-1.189592", "coords_hint": "1", "use_case": "EV charging support", "notes": "Exact location from burnell website pictures", "project_website": "https://energysuperhuboxford.org/", "link1": "https://www.euractiv.com/section/electricity/news/uks-first-grid-scale-battery-storage-system-comes-online-in-oxford/", "link2": "https://www.burnell.uk.com/energy-superhub-oxford/", "link3": "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "link4": ""}, "internal_id": "91", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-24", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Oxford Energy Superhub", "name_short": "Oxford Energy Superhub", "owner": "Pivot Power (EDF Renewables)", "state": "", "country": "uk", "lat": "51.709722", "long": "-1.189592", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.709722+-1.189592", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Exact location from burnell website pictures"], "links": ["https://www.euractiv.com/section/electricity/news/uks-first-grid-scale-battery-storage-system-comes-online-in-oxford/", "https://www.burnell.uk.com/energy-superhub-oxford/", "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blythe Solar 110, LLC", "city": "", "id": "175", "external_id": "60093", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "63", "customer": "", "owner": "Blythe Solar 110, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "175", "external_id": "60093", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blythe Solar 110, LLC", "external_id": "60093", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 126, "power_mw": 63, "owner": "Blythe Solar 110, LLC", "status": "operation", "date_first_heard": "2021-02", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BES1": {"first": {"year": "2021", "month": "6", "entity id": "59842", "entity name": "Blythe Solar 110, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar 110, LLC", "plant state": "CA", "plant id": "60093", "generator id": "BES1", "net summer capacity (mw)": "63", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "60093", "date": "2021-06", "mw": 63}, "first_month": "2021-02", "changes": [{"month": "2021-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "6", "entity id": "59842", "entity name": "Blythe Solar 110, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar 110, LLC", "plant state": "CA", "plant id": "60093", "generator id": "BES1", "net summer capacity (mw)": "63", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60093", "date": "2021-06", "mw": 63}, "current_month": "2022-02", "dates": {"first_heard": "2021-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 63, "mwh_is_estimate": true, "mwh": 126, "mwh_estimate": 126, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-02", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Blythe Solar 110, LLC", "name_short": "Blythe Solar 110", "owner": "Blythe Solar 110, LLC", "state": "california", "country": "usa", "lat": "40.872677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.872677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Top Gun Energy Storage", "city": "", "id": "189", "external_id": "61366", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "189", "external_id": "61366", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Top Gun Energy Storage", "external_id": "61366", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "San Diego Gas & Electric Co", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TGES": {"first": {"year": "2021", "month": "1", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Top Gun Energy Storage", "plant state": "CA", "plant id": "61366", "generator id": "TGES", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "61366", "date": "2021-01", "mw": 30}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "date", "from": "2021-01", "to": "2021-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-02", "li": [{"name": "date", "from": "2021-03", "to": "2021-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-03", "li": [{"name": "date", "from": "2021-04", "to": "2021-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-05", "to": "2021-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-07", "to": "2021-06", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "6", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Top Gun Energy Storage", "plant state": "CA", "plant id": "61366", "generator id": "TGES", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61366", "date": "2021-06", "mw": 30}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Top Gun Energy Storage", "name_short": "Top Gun", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.23330508398623", "long": "-121.64052723283366", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.23330508398623+-121.64052723283366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Johanna Energy Center, LLC", "city": "", "id": "190", "external_id": "63843", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "190", "external_id": "63843", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Johanna Energy Center, LLC", "external_id": "63843", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Johanna Energy Center, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SASP1": {"first": {"year": "2020", "month": "10", "entity id": "63522", "entity name": "Santa Ana Storage 1", "plant producer type": "IPP", "plant name": "Johanna Energy Center, LLC", "plant state": "CA", "plant id": "63843", "generator id": "SASP1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63843", "date": "2020-10", "mw": 20}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2020-10", "to": "2021-01", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-02", "li": [{"name": "date", "from": "2021-01", "to": "2021-05", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2021-07", "li": [{"name": "date", "from": "2021-05", "to": "2021-08", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-08", "to": "2021-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "entity name", "from": "Santa Ana Storage 1", "to": "Johanna Energy Center, LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "6", "entity id": "63522", "entity name": "Johanna Energy Center, LLC", "plant producer type": "IPP", "plant name": "Johanna Energy Center, LLC", "plant state": "CA", "plant id": "63843", "generator id": "SASP1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63843", "date": "2021-06", "mw": 20}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Johanna Energy Center, LLC", "name_short": "Johanna Energy Center", "owner": "Johanna Energy Center, LLC", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.48004900000001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.48004900000001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Battle Mountain Solar Project", "city": "", "id": "232", "external_id": "61098", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "232", "external_id": "61098", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Battle Mountain Solar Project", "external_id": "61098", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Consolidated Edison Development Inc.", "status": "operation", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BMBS": {"first": {"year": "2021", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Battle Mountain Solar Project", "plant state": "NV", "plant id": "61098", "generator id": "BMBS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61098", "date": "2021-06", "mw": 25}, "first_month": "2021-09", "changes": [], "current": {"year": "2021", "month": "6", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Battle Mountain Solar Project", "plant state": "NV", "plant id": "61098", "generator id": "BMBS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61098", "date": "2021-06", "mw": 25}, "current_month": "2022-02", "dates": {"first_heard": "2021-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-09", "start_construction": "", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Battle Mountain Solar Project", "name_short": "Battle Mountain Solar", "owner": "Consolidated Edison Development Inc.", "state": "nevada", "country": "usa", "lat": "41.48226633376159", "long": "-114.990143767415", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.48226633376159+-114.990143767415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aikengall II Community Wind Farm Battery", "city": "", "id": "294", "external_id": "7015", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Community Wind Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "294", "external_id": "7015", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Aikengall II Community Wind Farm Battery", "external_id": "7015", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Community Wind Power", "status": "operation", "date_first_heard": "2019-07-04", "start_construction": "2020-12-01", "start_operation": "2021-06-01", "start_estimated": "", "month_disappeared": "", "lat": "55.907534", "long": "-2.513953", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7015", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Community Wind Power", "Site Name": "Aikengall II Community Wind Farm Battery", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4332", "Installed Capacity (MWelec)": "80.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "4.20", "No. of Turbines": "19", "Height of Turbines (m)": "145.00", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Aikengall II Community Wind Fa, Innerwick, Dunbar, Lothian", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH42 1", "X-coordinate": "367967", "Y-coordinate": "668389", "Planning Authority": "East Lothian Council", "Planning Application Reference": "18/00865/P", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/01/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/07/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.907534", "long": "-2.513953", "status": "planning", "mw": 80, "ext_id": "7015"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Turbine Capacity (MW)", "from": "4.20", "to": "4.2", "extra": "", "change_type": "misc"}, {"name": "Height of Turbines (m)", "from": "145.00", "to": "145", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Turbine Capacity (MW)", "from": "4.2", "to": "", "extra": "", "change_type": "misc"}, {"name": "No. of Turbines", "from": "19", "to": "", "extra": "", "change_type": "misc"}, {"name": "Height of Turbines (m)", "from": "145", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/12/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/06/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7015", "Record Last Updated (dd/mm/yyyy)": "27/03/2023", "Operator (or Applicant)": "Community Wind Power", "Site Name": "Aikengall II Community Wind Farm Battery", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4332", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Aikengall II Community Wind Fa, Innerwick, Dunbar, Lothian", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH42 1", "X-coordinate": "367967", "Y-coordinate": "668389", "Planning Authority": "East Lothian Council", "Planning Application Reference": "18/00865/P", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/01/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/07/2022", "Under Construction": "01/12/2020", "Operational": "01/06/2021", "Heat Network Ref": "", "lat": "55.907534", "long": "-2.513953", "status": "operation", "mw": 80, "ext_id": "7015"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-07-04", "start_construction": "2020-12-01", "start_operation": "2021-06-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Aikengall II Community Wind Farm Battery", "name_short": "Aikengall II Community Wind Farm Ba...", "owner": "Community Wind Power", "state": "scotland", "country": "uk", "lat": "55.907534", "long": "-2.513953", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.907534+-2.513953", "construction_time_month": 6, "construction_speed_mwh_per_month": 13, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dundee Technology Park", "city": "", "id": "424", "external_id": "7946", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-09", "start_construction": "", "start_operation": "2021-06-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "424", "external_id": "7946", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dundee Technology Park", "external_id": "7946", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gigabox Developments", "status": "operation", "date_first_heard": "2020-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.471983", "long": "-3.052845", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7946", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Gigabox Developments", "Site Name": "Dundee Technology Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land At Technology Park, South Road, Dundee, Tayside", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 4LX", "X-coordinate": "335237", "Y-coordinate": "731592", "Planning Authority": "Dundee City Council", "Planning Application Reference": "20/00239/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/04/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/10/2023", "Under Construction": "", "Operational": "21/06/2021", "Heat Network Ref": "", "lat": "56.471983", "long": "-3.052845", "status": "operation", "mw": 49, "ext_id": "7946"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "30/09/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "21/06/2021", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7946", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Gigabox Developments", "Site Name": "Dundee Technology Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Technology Park, South Road, Dundee, Tayside", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 4LX", "X-coordinate": "335237", "Y-coordinate": "731592", "Planning Authority": "Dundee City Council", "Planning Application Reference": "20/00239/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/04/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.471983", "long": "-3.052845", "status": "operation", "mw": 49, "ext_id": "7946"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-09", "start_construction": "", "start_operation": "2021-06-21", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Dundee Technology Park", "name_short": "Dundee Technology Park", "owner": "Gigabox Developments", "state": "scotland", "country": "uk", "lat": "56.471983", "long": "-3.052845", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.471983+-3.052845", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blythe III Storage Project", "city": "Riverside County", "id": "65", "external_id": "60094", "state": "california", "country": "usa", "capacity_mwh": "460", "estimate_mwh": "", "power_mw": "115", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Samsung", "type": "", "cells": "Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-02-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.673021", "long": "-114.754474", "coords_hint": "1", "use_case": "solar", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "", "link3": "", "link4": ""}, "internal_id": "65", "external_id": "60094", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blythe Solar III, LLC Hybrid", "external_id": "60094", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 230, "power_mw": 115, "owner": "Blythe Solar III, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BLST3": {"first": {"year": "2021", "month": "5", "entity id": "59844", "entity name": "Blythe Solar III, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar III, LLC Hybrid", "plant state": "CA", "plant id": "60094", "generator id": "BLST3", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "60094", "date": "2021-05", "mw": 115}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "5", "entity id": "59844", "entity name": "Blythe Solar III, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar III, LLC Hybrid", "plant state": "CA", "plant id": "60094", "generator id": "BLST3", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60094", "date": "2021-05", "mw": 115}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 115, "mwh_is_estimate": false, "mwh": 460, "mwh_estimate": 230, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-05", "start_estimated": "", "month_disappeared": "", "go_live": "2021-05", "go_live_year_int": 2021, "name": "Blythe Solar III, LLC Hybrid", "name_short": "Blythe Solar III", "owner": "Blythe Solar III, LLC", "state": "california", "country": "usa", "lat": "33.673021", "long": "-114.754474", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.673021+-114.754474", "construction_time_month": 6, "construction_speed_mwh_per_month": 76, "no_of_battery_units": 0, "notes_split": ["part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries"], "links": ["https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grissom Solar, LLC", "city": "", "id": "224", "external_id": "64450", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Grissom Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "224", "external_id": "64450", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Grissom Solar, LLC", "external_id": "64450", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Grissom Solar, LLC", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-05", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GSF02": {"first": {"year": "2021", "month": "5", "entity id": "64118", "entity name": "Grissom Solar, LLC", "plant producer type": "IPP", "plant name": "Grissom Solar, LLC", "plant state": "NC", "plant id": "64450", "generator id": "GSF02", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64450", "date": "2021-05", "mw": 10}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-07", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "5", "entity id": "64118", "entity name": "Grissom Solar, LLC", "plant producer type": "IPP", "plant name": "Grissom Solar, LLC", "plant state": "NC", "plant id": "64450", "generator id": "GSF02", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64450", "date": "2021-05", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2021-04", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-05", "start_estimated": "", "month_disappeared": "", "go_live": "2021-05", "go_live_year_int": 2021, "name": "Grissom Solar, LLC", "name_short": "Grissom Solar", "owner": "Grissom Solar, LLC", "state": "north carolina", "country": "usa", "lat": "36.447777234085784", "long": "-76.83727682472", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.447777234085784+-76.83727682472", "construction_time_month": -1, "construction_speed_mwh_per_month": -20, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Saticoy", "city": "oxnard / los angeles", "id": "3", "external_id": "63891", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Arevon", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "142", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-06-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.25773", "long": "-119.158534", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "", "project_website": "", "link1": "https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "link2": "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "link3": "https://arevonenergy.com/location/saticoy/", "link4": ""}, "internal_id": "3", "external_id": "63891", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Saticoy", "external_id": "63891", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Ventura Energy Storage, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SATCY": {"first": {"year": "2021", "month": "4", "entity id": "63550", "entity name": "Ventura Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Saticoy", "plant state": "CA", "plant id": "63891", "generator id": "SATCY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63891", "date": "2021-04", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-04", "to": "2021-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-05", "to": "2021-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "4", "entity id": "63550", "entity name": "Ventura Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Saticoy", "plant state": "CA", "plant id": "63891", "generator id": "SATCY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63891", "date": "2021-04", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Saticoy", "name_short": "Saticoy", "owner": "Ventura Energy Storage, LLC", "state": "california", "country": "usa", "lat": "34.25773", "long": "-119.158534", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.25773+-119.158534", "construction_time_month": 5, "construction_speed_mwh_per_month": 80, "no_of_battery_units": 142, "notes_split": [""], "links": ["https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "https://arevonenergy.com/location/saticoy/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wilmot Energy Center LLC", "city": "", "id": "149", "external_id": "64426", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Wilmot Energy Center LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "149", "external_id": "64426", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wilmot Energy Center LLC", "external_id": "64426", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Wilmot Energy Center LLC", "status": "operation", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WILBA": {"first": {"year": "2021", "month": "5", "entity id": "64002", "entity name": "Wilmot Energy Center LLC", "plant producer type": "IPP", "plant name": "Wilmot Energy Center LLC", "plant state": "AZ", "plant id": "64426", "generator id": "WILBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64426", "date": "2021-05", "mw": 30}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-05", "to": "2021-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "4", "entity id": "64002", "entity name": "Wilmot Energy Center LLC", "plant producer type": "IPP", "plant name": "Wilmot Energy Center LLC", "plant state": "AZ", "plant id": "64426", "generator id": "WILBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64426", "date": "2021-04", "mw": 30}, "current_month": "2022-02", "dates": {"first_heard": "2021-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Wilmot Energy Center LLC", "name_short": "Wilmot Energy Center", "owner": "Wilmot Energy Center LLC", "state": "arizona", "country": "usa", "lat": "36.56433572443623", "long": "-110.14964771153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.56433572443623+-110.14964771153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Silverstrand Grid Energy Storage System", "city": "", "id": "193", "external_id": "63735", "state": "california", "country": "usa", "capacity_mwh": "46", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Silverstrand Grid, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.205195", "long": "-119.058256", "coords_hint": "3", "use_case": "", "notes": "Using 3.1MWh to get from the packs to capacity", "project_website": "", "link1": "https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/", "link2": "", "link3": "", "link4": ""}, "internal_id": "193", "external_id": "63735", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Silverstrand Grid Energy Storage System", "external_id": "63735", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "Silverstrand Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SLV01": {"first": {"year": "2021", "month": "3", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "plant producer type": "IPP", "plant name": "Silverstrand Grid Energy Storage System", "plant state": "CA", "plant id": "63735", "generator id": "SLV01", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63735", "date": "2021-03", "mw": 11}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-03", "to": "2021-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "4", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "plant producer type": "IPP", "plant name": "Silverstrand Grid Energy Storage System", "plant state": "CA", "plant id": "63735", "generator id": "SLV01", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63735", "date": "2021-04", "mw": 11}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": false, "mwh": 46, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Silverstrand Grid Energy Storage System", "name_short": "Silverstrand Grid", "owner": "Silverstrand Grid, LLC", "state": "california", "country": "usa", "lat": "34.205195", "long": "-119.058256", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.205195+-119.058256", "construction_time_month": 3, "construction_speed_mwh_per_month": 15, "no_of_battery_units": 15, "notes_split": ["Using 3.1MWh to get from the packs to capacity"], "links": ["https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "AES Kekaha Solar, LLC Hybrid", "city": "", "id": "218", "external_id": "63280", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "218", "external_id": "63280", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES Kekaha Solar, LLC Hybrid", "external_id": "63280", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 28, "power_mw": 14, "owner": "AES Distributed Energy", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2020", "month": "9", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Kekaha Solar, LLC Hybrid", "plant state": "HI", "plant id": "63280", "generator id": "BESS", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "63280", "date": "2020-09", "mw": 14}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "date", "from": "2020-09", "to": "2021-04", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "4", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Kekaha Solar, LLC Hybrid", "plant state": "HI", "plant id": "63280", "generator id": "BESS", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63280", "date": "2021-04", "mw": 14}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 14, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "AES Kekaha Solar, LLC Hybrid", "name_short": "AES Kekaha Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.496639090550673", "long": "-155.3549676691025", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.496639090550673+-155.3549676691025", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blythe II Storage Project", "city": "Riverside County", "id": "64", "external_id": "60092", "state": "california", "country": "usa", "capacity_mwh": "460", "estimate_mwh": "", "power_mw": "115", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Samsung", "type": "", "cells": "Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2013-04-22", "start_construction": "", "start_operation": "2021-02-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.676313", "long": "-114.75575", "coords_hint": "1", "use_case": "solar", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "https://ieefa.org/nextera-brings-first-section-of-massive-california-battery-storage-complex-online/", "link3": "", "link4": ""}, "internal_id": "64", "external_id": "60092", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blythe Solar II, LLC", "external_id": "60092", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 230, "power_mw": 115, "owner": "Blythe Solar II, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BLST2": {"first": {"year": "2021", "month": "2", "entity id": "59843", "entity name": "Blythe Solar II, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar II, LLC", "plant state": "CA", "plant id": "60092", "generator id": "BLST2", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "60092", "date": "2021-02", "mw": 115}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-02", "to": "2021-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-05", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "3", "entity id": "59843", "entity name": "Blythe Solar II, LLC", "plant producer type": "IPP", "plant name": "Blythe Solar II, LLC", "plant state": "CA", "plant id": "60092", "generator id": "BLST2", "net summer capacity (mw)": "115", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60092", "date": "2021-03", "mw": 115}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 115, "mwh_is_estimate": false, "mwh": 460, "mwh_estimate": 230, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-03", "start_estimated": "", "month_disappeared": "", "go_live": "2021-03", "go_live_year_int": 2021, "name": "Blythe Solar II, LLC", "name_short": "Blythe Solar II", "owner": "Blythe Solar II, LLC", "state": "california", "country": "usa", "lat": "33.676313", "long": "-114.75575", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.676313+-114.75575", "construction_time_month": 4, "construction_speed_mwh_per_month": 115, "no_of_battery_units": 0, "notes_split": ["part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries"], "links": ["https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "https://ieefa.org/nextera-brings-first-section-of-massive-california-battery-storage-complex-online/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vallecito Energy Storage Resilience (VESR)", "city": "carpinteria / santa barbara county", "id": "11", "external_id": "62801", "state": "california", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Clean Coalition", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "2020-11-05", "start_operation": "2021-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.408083", "long": "-119.512937", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "link2": "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/", "link3": "", "link4": ""}, "internal_id": "11", "external_id": "62801", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vallecito", "external_id": "62801", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Viridity Energy Solutions, Inc.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ORN34": {"first": {"year": "2020", "month": "12", "entity id": "61522", "entity name": "Viridity Energy Solutions, Inc.", "plant producer type": "IPP", "plant name": "Vallecito", "plant state": "CA", "plant id": "62801", "generator id": "ORN34", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "62801", "date": "2020-12", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "date", "from": "2020-12", "to": "2021-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-03", "to": "2021-02", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "2", "entity id": "61522", "entity name": "Viridity Energy Solutions, Inc.", "plant producer type": "IPP", "plant name": "Vallecito", "plant state": "CA", "plant id": "62801", "generator id": "ORN34", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62801", "date": "2021-02", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11-05", "start_operation": "2021-02", "start_estimated": "", "month_disappeared": "", "go_live": "2021-02", "go_live_year_int": 2021, "name": "Vallecito", "name_short": "Vallecito", "owner": "Viridity Energy Solutions, Inc.", "state": "california", "country": "usa", "lat": "34.408083", "long": "-119.512937", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.408083+-119.512937", "construction_time_month": 3, "construction_speed_mwh_per_month": 13, "no_of_battery_units": 15, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Mardyck", "city": "Dunkirk", "id": "93", "external_id": "", "state": "", "country": "france", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "25", "customer": "RTE", "owner": "Total", "developer": "", "manufacturer": "Saft", "type": "Intensium Max 20 High Energy (20ft container)", "cells": "NMC", "no_of_battery_units": "11", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-02-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.029549", "long": "2.252929", "coords_hint": "2", "use_case": "frequency balancing", "notes": "saft is owned by total", "project_website": "", "link1": "https://www.energy-storage.news/frances-biggest-battery-storage-system-at-25mw-goes-into-operation/", "link2": "https://totalenergies.com/media/news/press-releases/total-build-largest-battery-based-energy-storage-project-france", "link3": "https://www.saftbatteries.com/products-solutions/products/intensium\ufffd-max-20-high-energy", "link4": ""}, "internal_id": "93", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 25, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-02-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-02", "go_live_year_int": 2021, "name": "Mardyck", "name_short": "Mardyck", "owner": "Total", "state": "", "country": "france", "lat": "51.029549", "long": "2.252929", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.029549+2.252929", "construction_time_month": 4, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 11, "notes_split": ["saft is owned by total"], "links": ["https://www.energy-storage.news/frances-biggest-battery-storage-system-at-25mw-goes-into-operation/", "https://totalenergies.com/media/news/press-releases/total-build-largest-battery-based-energy-storage-project-france", "https://www.saftbatteries.com/products-solutions/products/intensium\ufffd-max-20-high-energy"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamitos", "city": "Long Beach / Los Angeles", "id": "46", "external_id": "61204", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Southern California Edison (SCE)", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Advancion 5", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-06-01", "start_operation": "2021-01-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.770365", "long": "-118.101597", "coords_hint": "1", "use_case": "gas peaker plant replacement, 20 year ppa", "notes": "", "project_website": "", "link1": "https://blog.fluenceenergy.com/aes-fluence-commission-alamitos-energy-storage-facility-long-beach-california", "link2": "https://blog.fluenceenergy.com/fluence-aes-alamitos-battery-energy-storage-system-made-history", "link3": "https://www.energy-storage.news/battery-storage-as-peaking-capacity-how-alamitos-changed-the-game-for-california/", "link4": ""}, "internal_id": "46", "external_id": "61204", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES ES ALAMITOS, LLC", "external_id": "61204", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "AES ES Alamitos, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ALMTS": {"first": {"year": "2021", "month": "1", "entity id": "62160", "entity name": "AES ES Alamitos, LLC", "plant producer type": "IPP", "plant name": "AES ES ALAMITOS, LLC", "plant state": "CA", "plant id": "61204", "generator id": "ALMTS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "61204", "date": "2021-01", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "1", "entity id": "62160", "entity name": "AES ES Alamitos, LLC", "plant producer type": "IPP", "plant name": "AES ES ALAMITOS, LLC", "plant state": "CA", "plant id": "61204", "generator id": "ALMTS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "61204", "date": "2021-01", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2019-06-01", "start_operation": "2021-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-01", "go_live_year_int": 2021, "name": "AES ES ALAMITOS, LLC", "name_short": "AES ES ALAMITOS", "owner": "AES ES Alamitos, LLC", "state": "california", "country": "usa", "lat": "33.770365", "long": "-118.101597", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.770365+-118.101597", "construction_time_month": 19, "construction_speed_mwh_per_month": 21, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://blog.fluenceenergy.com/aes-fluence-commission-alamitos-energy-storage-facility-long-beach-california", "https://blog.fluenceenergy.com/fluence-aes-alamitos-battery-energy-storage-system-made-history", "https://www.energy-storage.news/battery-storage-as-peaking-capacity-how-alamitos-changed-the-game-for-california/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Harvest II LLC", "city": "", "id": "187", "external_id": "64103", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "35", "customer": "", "owner": "Desert Harvest II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "187", "external_id": "64103", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Harvest II LLC", "external_id": "64103", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 70, "power_mw": 35, "owner": "Desert Harvest II LLC", "status": "operation", "date_first_heard": "2020-12", "start_construction": "2021-01", "start_operation": "2021-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DH003": {"first": {"year": "2020", "month": "12", "entity id": "63731", "entity name": "Desert Harvest II LLC", "plant producer type": "IPP", "plant name": "Desert Harvest II LLC", "plant state": "CA", "plant id": "64103", "generator id": "DH003", "net summer capacity (mw)": "35", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64103", "date": "2020-12", "mw": 35}, "first_month": "2020-12", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2020-12", "to": "2021-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-02", "to": "2021-01", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "1", "entity id": "63731", "entity name": "Desert Harvest II LLC", "plant producer type": "IPP", "plant name": "Desert Harvest II LLC", "plant state": "CA", "plant id": "64103", "generator id": "DH003", "net summer capacity (mw)": "35", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64103", "date": "2021-01", "mw": 35}, "current_month": "2022-02", "dates": {"first_heard": "2020-12", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 35, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-12", "start_construction": "2021-01", "start_operation": "2021-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-01", "go_live_year_int": 2021, "name": "Desert Harvest II LLC", "name_short": "Desert Harvest II", "owner": "Desert Harvest II LLC", "state": "california", "country": "usa", "lat": "41.37670833623373", "long": "-121.48461356921983", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.37670833623373+-121.48461356921983", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Minety", "city": "Minety", "id": "55", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "133", "estimate_mwh": "", "power_mw": "100", "customer": "Penso Power / China Huaneng Group / CNIC", "owner": "", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "LFP CATL, NMC Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-12-01", "start_operation": "2020-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.605997", "long": "-2.003146", "coords_hint": "1", "use_case": "", "notes": "PPA from shell, when second stage is complete it will be 150MW/266MWh", "project_website": "https://www.pensopower.com/", "link1": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-nsenergy-minety-55", "link2": "https://www.energy-storage.news/what-we-know-about-europes-largest-grid-connected-battery-project-so-far/", "link3": "https://eclipsepower.co.uk/project/minety-battery-storage/", "link4": ""}, "internal_id": "55", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 133, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2019-12-01", "start_operation": "2020-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2020-12", "go_live_year_int": 2020, "name": "Minety", "name_short": "Minety", "owner": "", "state": "", "country": "uk", "lat": "51.605997", "long": "-2.003146", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.605997+-2.003146", "construction_time_month": 12, "construction_speed_mwh_per_month": 11, "no_of_battery_units": 0, "notes_split": ["PPA from shell, when second stage is complete it will be 150MW/266MWh"], "links": ["https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-nsenergy-minety-55", "https://www.energy-storage.news/what-we-know-about-europes-largest-grid-connected-battery-project-so-far/", "https://eclipsepower.co.uk/project/minety-battery-storage/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Big Battery Lausitz", "city": "", "id": "526", "external_id": "SEE905930139120", "state": "brandenburg", "country": "germany", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "66", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "526", "external_id": "SEE905930139120", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Big Battery Lausitz", "external_id": "SEE905930139120", "state": "brandenburg", "country": "germany", "mwh": 52, "estimate_mwh": "", "power_mw": 66, "owner": "Lausitz Energie Kraftwerke AG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": "", "month_disappeared": "", "lat": "51.531359", "long": "14.348723", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2725831"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE905930139120", "DatumLetzteAktualisierung": "2021-05-05T12:35:57.5832256", "LokationMaStRNummer": "SEL981397405626", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-05-06", "AnlagenbetreiberMastrNummer": "ABR967895852209", "Land": "84", "Bundesland": "1400", "Landkreis": "Spree-Nei\u00dfe", "Gemeinde": "Spremberg", "Gemeindeschluessel": "12071372", "Postleitzahl": "03130", "Strasse": "An der alten Ziegelei", "StrasseNichtGefunden": "0", "Hausnummer": "1", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Spremberg", "Laengengrad": "14.348723", "Breitengrad": "51.531359", "Registrierungsdatum": "2020-12-03", "Inbetriebnahmedatum": "2020-11-19", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Big Battery Lausitz", "Weic": "11W0-0000-0206-W", "Weic_nv": "0", "WeicDisplayName": "KSP__BIG_BATT_L", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "66000.000", "Nettonennleistung": "66000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911931000004", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE985859962276", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "76440.000", "SpeMastrNummer": "SSE911582588209", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 52, "pr_url_id": "2725831", "ext_id": "SEE905930139120", "mw": 66, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE905930139120", "DatumLetzteAktualisierung": "2021-05-05T12:35:57.5832256", "LokationMaStRNummer": "SEL981397405626", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-05-06", "AnlagenbetreiberMastrNummer": "ABR967895852209", "Land": "84", "Bundesland": "1400", "Landkreis": "Spree-Nei\u00dfe", "Gemeinde": "Spremberg", "Gemeindeschluessel": "12071372", "Postleitzahl": "03130", "Strasse": "An der alten Ziegelei", "StrasseNichtGefunden": "0", "Hausnummer": "1", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Spremberg", "Laengengrad": "14.348723", "Breitengrad": "51.531359", "Registrierungsdatum": "2020-12-03", "Inbetriebnahmedatum": "2020-11-19", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Big Battery Lausitz", "Weic": "11W0-0000-0206-W", "Weic_nv": "0", "WeicDisplayName": "KSP__BIG_BATT_L", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "66000.000", "Nettonennleistung": "66000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911931000004", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE985859962276", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "76440.000", "SpeMastrNummer": "SSE911582588209", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2725831", "owner": "Lausitz Energie Kraftwerke AG", "mwh": 52, "ext_id": "SEE905930139120", "mw": 66, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": ""}}, "mw": 66, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": "", "month_disappeared": "", "go_live": "2020-11", "go_live_year_int": 2020, "name": "Big Battery Lausitz", "name_short": "Big Battery Lausitz", "owner": "Lausitz Energie Kraftwerke AG", "state": "brandenburg", "country": "germany", "lat": "51.531359", "long": "14.348723", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.531359+14.348723", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2725831"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "WindCharger", "city": "", "id": "16", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "10", "customer": "TransAlta", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "9", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "49.582737", "long": "-113.794235", "coords_hint": "1", "use_case": "wind farm support", "notes": "", "project_website": "", "link1": "https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "link2": "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "link3": "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf", "link4": ""}, "internal_id": "16", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "month_disappeared": "", "go_live": "2020-10", "go_live_year_int": 2020, "name": "WindCharger", "name_short": "WindCharger", "owner": "", "state": "alberta", "country": "canada", "lat": "49.582737", "long": "-113.794235", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.582737+-113.794235", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 9, "notes_split": [""], "links": ["https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "ngen slovenia 2", "city": "Kidrievo", "id": "21", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "15", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "12", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.391223", "long": "15.78985", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/", "link2": "", "link3": "", "link4": ""}, "internal_id": "21", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 15, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "month_disappeared": "", "go_live": "2020-10", "go_live_year_int": 2020, "name": "ngen slovenia 2", "name_short": "ngen slovenia 2", "owner": "", "state": "", "country": "slovenia", "lat": "46.391223", "long": "15.78985", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.391223+15.78985", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 12, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Holes Bay", "city": "Poole", "id": "17", "external_id": "", "state": "dorset", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "7.5", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures BV ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "link2": "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "link3": "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "link4": "https://frv.com/en/projects/holes-bay/"}, "internal_id": "17", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 7, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "month_disappeared": "", "go_live": "2020-09", "go_live_year_int": 2020, "name": "Holes Bay", "name_short": "Holes Bay", "owner": "", "state": "dorset", "country": "uk", "lat": "50.726395", "long": "-1.9901", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.726395+-1.9901", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 6, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "https://frv.com/en/projects/holes-bay/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Nether Moor Field", "city": "", "id": "305", "external_id": "7019", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Thurcroft Energy (Max Design Consultancy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "305", "external_id": "7019", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Nether Moor Field", "external_id": "7019", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Thurcroft Energy (Max Design Consultancy)", "status": "operation", "date_first_heard": "2019-11-22", "start_construction": "", "start_operation": "2020-09-01", "start_estimated": "", "month_disappeared": "", "lat": "53.401251", "long": "-1.26828", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7019", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Thurcroft Energy (Max Design Consultancy)", "Site Name": "Nether Moor Field", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Nether Moor Field, Green Lane, Thurcroft, Rotherham, South Yorkshire", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S66", "X-coordinate": "448748", "Y-coordinate": "389630", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2017/1426", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.401251", "long": "-1.26828", "status": "planning", "mw": 49, "ext_id": "7019"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/11/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/09/2020", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/05/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7019", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Thurcroft Energy (Max Design Consultancy)", "Site Name": "Nether Moor Field", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Nether Moor Field, Green Lane, Thurcroft, Rotherham, South Yorkshire", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S66", "X-coordinate": "448748", "Y-coordinate": "389630", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2017/1426", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/11/2022", "Under Construction": "", "Operational": "01/09/2020", "Heat Network Ref": "", "lat": "53.401251", "long": "-1.26828", "status": "operation", "mw": 49, "ext_id": "7019"}, "current_month": "2024-01", "dates": {"first_heard": "2020-05-27", "start_construction": "", "start_operation": "2020-05-27"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-11-22", "start_construction": "", "start_operation": "2020-09-01", "start_estimated": "", "month_disappeared": "", "go_live": "2020-09", "go_live_year_int": 2020, "name": "Nether Moor Field", "name_short": "Nether Moor Field", "owner": "Thurcroft Energy (Max Design Consultancy)", "state": "yorkshire and humber", "country": "uk", "lat": "53.401251", "long": "-1.26828", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.401251+-1.26828", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stanton Energy Reliability Center Hybrid", "city": "", "id": "195", "external_id": "60698", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Wellhead Energy, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "195", "external_id": "60698", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Stanton Energy Reliability Center Hybrid", "external_id": "60698", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Wellhead Energy, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-08", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2020", "month": "9", "entity id": "20323", "entity name": "Wellhead Energy, LLC", "plant producer type": "IPP", "plant name": "Stanton Energy Reliability Center Hybrid", "plant state": "CA", "plant id": "60698", "generator id": "BESS1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(OT) Other", "ext_id": "60698", "date": "2020-09", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(OT) Other", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2020-09", "to": "2020-08", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2020", "month": "8", "entity id": "20323", "entity name": "Wellhead Energy, LLC", "plant producer type": "IPP", "plant name": "Stanton Energy Reliability Center Hybrid", "plant state": "CA", "plant id": "60698", "generator id": "BESS1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60698", "date": "2020-08", "mw": 10}, "current_month": "2021-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}, "BESS2": {"first": {"year": "2020", "month": "9", "entity id": "20323", "entity name": "Wellhead Energy, LLC", "plant producer type": "IPP", "plant name": "Stanton Energy Reliability Center Hybrid", "plant state": "CA", "plant id": "60698", "generator id": "BESS2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(OT) Other", "ext_id": "60698", "date": "2020-09", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2020-10", "li": [{"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(OT) Other", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2020-09", "to": "2020-08", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2020", "month": "8", "entity id": "20323", "entity name": "Wellhead Energy, LLC", "plant producer type": "IPP", "plant name": "Stanton Energy Reliability Center Hybrid", "plant state": "CA", "plant id": "60698", "generator id": "BESS2", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60698", "date": "2020-08", "mw": 10}, "current_month": "2021-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-08", "start_estimated": "", "month_disappeared": "", "go_live": "2020-08", "go_live_year_int": 2020, "name": "Stanton Energy Reliability Center Hybrid", "name_short": "Stanton Energy Reliability Center", "owner": "Wellhead Energy, LLC", "state": "california", "country": "usa", "lat": "40.832677000000004", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.832677000000004+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fideoak Mills", "city": "", "id": "343", "external_id": "7152", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Kiwi Power (formerly Taunton Battery Storage)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-02-23", "start_construction": "2019-09-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "343", "external_id": "7152", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fideoak Mills", "external_id": "7152", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Kiwi Power (formerly Taunton Battery Storage)", "status": "operation", "date_first_heard": "2017-02-23", "start_construction": "2019-09-01", "start_operation": "2020-08-01", "start_estimated": "", "month_disappeared": "", "lat": "51.020082", "long": "-3.154791", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7152", "Record Last Updated (dd/mm/yyyy)": "21/02/2020", "Operator (or Applicant)": "Kiwi Power (formerly Taunton Battery Storage)", "Site Name": "Fideoak Mills", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Fideoak Mills, Upcott Road, Bishops Hull, Taunton, Somerset", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA4 1AF", "X-coordinate": "319099", "Y-coordinate": "125158", "Planning Authority": "Taunton Deane Borough Council", "Planning Application Reference": "05/16/0056", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/02/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.020082", "long": "-3.154791", "status": "construction", "mw": 30, "ext_id": "7152"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/02/2020", "to": "21/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/08/2020", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "21/09/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7152", "Record Last Updated (dd/mm/yyyy)": "21/09/2022", "Operator (or Applicant)": "Kiwi Power (formerly Taunton Battery Storage)", "Site Name": "Fideoak Mills", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fideoak Mills, Upcott Road, Bishops Hull, Taunton, Somerset", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA4 1AF", "X-coordinate": "319099", "Y-coordinate": "125158", "Planning Authority": "Taunton Deane Borough Council", "Planning Application Reference": "05/16/0056", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/02/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2019", "Operational": "01/08/2020", "Heat Network Ref": "", "lat": "51.020082", "long": "-3.154791", "status": "operation", "mw": 30, "ext_id": "7152"}, "current_month": "2024-01", "dates": {"first_heard": "2020-02-21", "start_construction": "", "start_operation": "2022-09-21"}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-02-23", "start_construction": "2019-09-01", "start_operation": "2020-08-01", "start_estimated": "", "month_disappeared": "", "go_live": "2020-08", "go_live_year_int": 2020, "name": "Fideoak Mills", "name_short": "Fideoak Mills", "owner": "Kiwi Power (formerly Taunton Battery Storage)", "state": "south west", "country": "uk", "lat": "51.020082", "long": "-3.154791", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.020082+-3.154791", "construction_time_month": 11, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gateway ", "city": "East Otey Mesa / San Diego", "id": "48", "external_id": "63834", "state": "california", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "LG", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-09-01", "start_operation": "2020-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.570558", "long": "-116.910955", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://vimeo.com/429223580", "link3": "https://en.wikipedia.org/wiki/Gateway_Energy_Storage", "link4": ""}, "internal_id": "48", "external_id": "63834", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gateway Energy Storage System", "external_id": "63834", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Gateway Energy Storage, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GTWAY": {"first": {"year": "2020", "month": "7", "entity id": "63512", "entity name": "Gateway Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Gateway Energy Storage System", "plant state": "CA", "plant id": "63834", "generator id": "GTWAY", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63834", "date": "2020-07", "mw": 250}, "first_month": "2020-09", "changes": [], "current": {"year": "2020", "month": "7", "entity id": "63512", "entity name": "Gateway Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Gateway Energy Storage System", "plant state": "CA", "plant id": "63834", "generator id": "GTWAY", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63834", "date": "2020-07", "mw": 250}, "current_month": "2021-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 500, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2019-09-01", "start_operation": "2020-07", "start_estimated": "", "month_disappeared": "", "go_live": "2020-07", "go_live_year_int": 2020, "name": "Gateway Energy Storage System", "name_short": "Gateway", "owner": "Gateway Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.570558", "long": "-116.910955", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.570558+-116.910955", "construction_time_month": 10, "construction_speed_mwh_per_month": 25, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.lspower.com/project-map/", "https://vimeo.com/429223580", "https://en.wikipedia.org/wiki/Gateway_Energy_Storage"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Solaseado", "city": "Haenam County", "id": "54", "external_id": "", "state": "jeolla", "country": "south korea", "capacity_mwh": "305", "estimate_mwh": "", "power_mw": "72", "customer": "Kospo", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-04-10", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.709899", "long": "126.41275", "coords_hint": "1", "use_case": "98MW solar farm support", "notes": "not sure whether Solaseado or Solasido is correct spelling", "project_website": "", "link1": "https://krenewables.com/solar/kospo-ignites-koreas-biggest-pv-farm/", "link2": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "link3": "", "link4": ""}, "internal_id": "54", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 72, "mwh_is_estimate": false, "mwh": 305, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-04-10", "start_estimated": "", "month_disappeared": "", "go_live": "2020-04", "go_live_year_int": 2020, "name": "Solaseado", "name_short": "Solaseado", "owner": "", "state": "jeolla", "country": "south korea", "lat": "34.709899", "long": "126.41275", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.709899+126.41275", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["not sure whether Solaseado or Solasido is correct spelling"], "links": ["https://krenewables.com/solar/kospo-ignites-koreas-biggest-pv-farm/", "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rush Springs Energy Storage (BA)", "city": "", "id": "238", "external_id": "63458", "state": "oklahoma", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Rush Springs Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-03-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "238", "external_id": "63458", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rush Springs Energy Storage (BA)", "external_id": "63458", "state": "oklahoma", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Rush Springs Energy Storage", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-03", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RUSHE": {"first": {"year": "2020", "month": "3", "entity id": "63187", "entity name": "Rush Springs Energy Storage", "plant producer type": "IPP", "plant name": "Rush Springs Energy Storage (BA)", "plant state": "OK", "plant id": "63458", "generator id": "RUSHE", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63458", "date": "2020-03", "mw": 10}, "first_month": "2020-09", "changes": [], "current": {"year": "2020", "month": "3", "entity id": "63187", "entity name": "Rush Springs Energy Storage", "plant producer type": "IPP", "plant name": "Rush Springs Energy Storage (BA)", "plant state": "OK", "plant id": "63458", "generator id": "RUSHE", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63458", "date": "2020-03", "mw": 10}, "current_month": "2021-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2020-03", "start_estimated": "", "month_disappeared": "", "go_live": "2020-03", "go_live_year_int": 2020, "name": "Rush Springs Energy Storage (BA)", "name_short": "Rush Springs Energy Storage (BA)", "owner": "Rush Springs Energy Storage", "state": "oklahoma", "country": "usa", "lat": "36.558188680458976", "long": "-95.03307098932751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.558188680458976+-95.03307098932751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bumpers Solar Farm ", "city": "", "id": "581", "external_id": "6913", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-12-01", "start_construction": "", "start_operation": "2020-03-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "581", "external_id": "6913", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bumpers Lane Solar Farm ", "external_id": "6913", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "Anesco", "status": "operation", "date_first_heard": "2021-12-01", "start_construction": "", "start_operation": "2020-03-16", "start_estimated": "", "month_disappeared": "", "lat": "51.752673", "long": "-0.892364", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6913", "Record Last Updated (dd/mm/yyyy)": "01/12/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Bumpers Lane Solar Farm ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6282", "Installed Capacity (MWelec)": "13.30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP27 9RE", "X-coordinate": "476556", "Y-coordinate": "206578", "Planning Authority": "Aylesbury Vale District Council", "Planning Application Reference": "14/A1926/NON", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "16/03/2020", "Heat Network Ref": "", "": "", "lat": "51.752673", "long": "-0.892364", "status": "operation", "mw": 13, "ext_id": "6913"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/12/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6913", "Record Last Updated (dd/mm/yyyy)": "01/12/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Bumpers Lane Solar Farm ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6282", "Installed Capacity (MWelec)": "13.3", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North Of Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP27 9RE", "X-coordinate": "476556", "Y-coordinate": "206578", "Planning Authority": "Aylesbury Vale District Council", "Planning Application Reference": "14/A1926/NON", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "16/03/2020", "Heat Network Ref": "", "lat": "51.752673", "long": "-0.892364", "status": "operation", "mw": 13, "ext_id": "6913"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-12-01", "start_construction": "", "start_operation": "2020-03-16", "start_estimated": "", "month_disappeared": "", "go_live": "2020-03", "go_live_year_int": 2020, "name": "Bumpers Lane Solar Farm ", "name_short": "Bumpers Lane Solar Farm ", "owner": "Anesco", "state": "south east", "country": "uk", "lat": "51.752673", "long": "-0.892364", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.752673+-0.892364", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMAREG 1", "city": "", "id": "531", "external_id": "SEE931375347240", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "531", "external_id": "SEE931375347240", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "SMAREG 1", "external_id": "SEE931375347240", "state": "thuringia", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "SMAREG 1", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": "", "month_disappeared": "", "lat": "50.928557", "long": "10.709715", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3059314"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE931375347240", "DatumLetzteAktualisierung": "2021-08-11T04:38:55.4735351", "LokationMaStRNummer": "SEL978603447778", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2021-08-11", "AnlagenbetreiberMastrNummer": "ABR930916959300", "Land": "84", "Bundesland": "1415", "Landkreis": "Gotha", "Gemeinde": "Gotha", "Gemeindeschluessel": "16067029", "Postleitzahl": "99867", "Gemarkung": "Gotha", "FlurFlurstuecknummern": "20 60/20", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Gotha", "Laengengrad": "10.709715", "Breitengrad": "50.928557", "Registrierungsdatum": "2020-05-19", "Inbetriebnahmedatum": "2020-02-06", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "SMAREG 1", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911845000009", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE937314325966", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 10, "pr_url_id": "3059314", "ext_id": "SEE931375347240", "mw": 10, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-08", "li": [{"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-08-11", "to": "2022-05-20", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE931375347240", "DatumLetzteAktualisierung": "2021-08-11T04:38:55.4735351", "LokationMaStRNummer": "SEL978603447778", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-05-20", "AnlagenbetreiberMastrNummer": "ABR930916959300", "Land": "84", "Bundesland": "1415", "Landkreis": "Gotha", "Gemeinde": "Gotha", "Gemeindeschluessel": "16067029", "Postleitzahl": "99867", "Gemarkung": "Gotha", "FlurFlurstuecknummern": "20 60/20", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Gotha", "Laengengrad": "10.709715", "Breitengrad": "50.928557", "Registrierungsdatum": "2020-05-19", "Inbetriebnahmedatum": "2020-02-06", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "SMAREG 1", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911845000009", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE937314325966", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3059314", "owner": "SMAREG 1", "mwh": 10, "ext_id": "SEE931375347240", "mw": 10, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": "", "month_disappeared": "", "go_live": "2020-02", "go_live_year_int": 2020, "name": "SMAREG 1", "name_short": "SMAREG 1", "owner": "SMAREG 1", "state": "thuringia", "country": "germany", "lat": "50.928557", "long": "10.709715", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.928557+10.709715", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3059314"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lake Bonney Wind Farm", "city": "", "id": "28", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "25", "customer": "Infigen Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-37.738826", "long": "140.38693", "coords_hint": "1", "use_case": "278MW wind farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "link2": "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/", "link3": "", "link4": ""}, "internal_id": "28", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "month_disappeared": "", "go_live": "2020-01", "go_live_year_int": 2020, "name": "Lake Bonney Wind Farm", "name_short": "Lake Bonney Wind Farm", "owner": "", "state": "south australia", "country": "australia", "lat": "-37.738826", "long": "140.38693", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-37.738826+140.38693", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Land to the west of Clay Hill Pit / Larport Farm", "city": "", "id": "263", "external_id": "6911", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Anesco (formerly owned by Energy Reservoirs)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-11-18", "start_construction": "2019-01-01", "start_operation": "2020-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "263", "external_id": "6911", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land to the west of Clay Hill Pit / Larport Farm", "external_id": "6911", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Anesco (formerly owned by Energy Reservoirs)", "status": "operation", "date_first_heard": "2016-11-18", "start_construction": "2019-01-01", "start_operation": "2020-01-01", "start_estimated": "", "month_disappeared": "", "lat": "52.054041", "long": "-2.62195", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6911", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Anesco (formerly owned by Energy Reservoirs)", "Site Name": "Land to the west of Clay Hill Pit / Larport Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land West of Clay Hill Pit Larport Farm Larport Lane Dormington Herefordshire ", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR1 4EP", "X-coordinate": "357450", "Y-coordinate": "239700", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P162400/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/01/2019", "Operational": "01/01/2020", "Heat Network Ref": "", "lat": "52.054041", "long": "-2.62195", "status": "operation", "mw": 20, "ext_id": "6911"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Land West of Clay Hill Pit Larport Farm Larport Lane Dormington Herefordshire ", "to": "Land West of Clay Hill Pit Larport Farm Larport Lane Dormington ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/01/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6911", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Anesco (formerly owned by Energy Reservoirs)", "Site Name": "Land to the west of Clay Hill Pit / Larport Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land West of Clay Hill Pit Larport Farm Larport Lane Dormington ", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR1 4EP", "X-coordinate": "357450", "Y-coordinate": "239700", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P162400/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/01/2019", "Operational": "01/01/2020", "Heat Network Ref": "", "lat": "52.054041", "long": "-2.62195", "status": "operation", "mw": 20, "ext_id": "6911"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-11-18", "start_construction": "2019-01-01", "start_operation": "2020-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2020-01", "go_live_year_int": 2020, "name": "Land to the west of Clay Hill Pit / Larport Farm", "name_short": "Land to the west of Clay Hill Pit /...", "owner": "Anesco (formerly owned by Energy Reservoirs)", "state": "west midlands", "country": "uk", "lat": "52.054041", "long": "-2.62195", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.054041+-2.62195", "construction_time_month": 12, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Nantucket", "city": "Nantucket island", "id": "25", "external_id": "", "state": "massachusetts", "country": "usa", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "6", "customer": "National Grid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.258489", "long": "-70.051666", "coords_hint": "1", "use_case": "island", "notes": "", "project_website": "", "link1": "https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "link2": "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/", "link3": "", "link4": ""}, "internal_id": "25", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 6, "mwh_is_estimate": false, "mwh": 48, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "month_disappeared": "", "go_live": "2019-19", "go_live_year_int": 2019, "name": "Nantucket", "name_short": "Nantucket", "owner": "", "state": "massachusetts", "country": "usa", "lat": "41.258489", "long": "-70.051666", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.258489+-70.051666", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Yorkshire", "city": "yorkshire", "id": "56", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "27", "customer": "", "owner": "", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.949604", "long": "-1.190935", "coords_hint": "0", "use_case": "34MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/industry-updates/yorkshire-uk-europes-largest-unsubsidized-solar-plus-storage-project/", "link2": "", "link3": "", "link4": ""}, "internal_id": "56", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 27, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-12", "go_live_year_int": 2019, "name": "Yorkshire", "name_short": "Yorkshire", "owner": "", "state": "", "country": "uk", "lat": "53.949604", "long": "-1.190935", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.949604+-1.190935", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-tech.org/industry-updates/yorkshire-uk-europes-largest-unsubsidized-solar-plus-storage-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Boscar Grange Farm", "city": "", "id": "371", "external_id": "7332", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "27", "power_mw": "27", "customer": "", "owner": "Gridserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-11-29", "start_construction": "2019-05-23", "start_operation": "2019-12-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "371", "external_id": "7332", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Boscar Grange Farm", "external_id": "7332", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 27, "power_mw": 27, "owner": "Gridserve", "status": "operation", "date_first_heard": "2018-11-29", "start_construction": "2019-05-23", "start_operation": "2019-12-18", "start_estimated": "", "month_disappeared": "", "lat": "54.14446", "long": "-1.228101", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7332", "Record Last Updated (dd/mm/yyyy)": "02/01/2020", "Operator (or Applicant)": "Gridserve", "Site Name": "Boscar Grange Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5482", "Installed Capacity (MWelec)": "27.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Boscar Grange Farm, Thirsk Road, Easingwold, York, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO61 3NQ", "X-coordinate": "450521", "Y-coordinate": "472345", "Planning Authority": "Hambleton District Council", "Planning Application Reference": "18/02314/NMC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "23/05/2019", "Operational": "18/12/2019", "Heat Network Ref": "", "lat": "54.14446", "long": "-1.228101", "status": "operation", "mw": 27, "ext_id": "7332"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/01/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "18/12/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7332", "Record Last Updated (dd/mm/yyyy)": "18/12/2019", "Operator (or Applicant)": "Gridserve", "Site Name": "Boscar Grange Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5482", "Installed Capacity (MWelec)": "27", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Boscar Grange Farm, Thirsk Road, Easingwold, York, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO61 3NQ", "X-coordinate": "450521", "Y-coordinate": "472345", "Planning Authority": "Hambleton District Council", "Planning Application Reference": "18/02314/NMC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "23/05/2019", "Operational": "18/12/2019", "Heat Network Ref": "", "lat": "54.14446", "long": "-1.228101", "status": "operation", "mw": 27, "ext_id": "7332"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 27, "mwh_is_estimate": true, "mwh": 27, "mwh_estimate": 27, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-11-29", "start_construction": "2019-05-23", "start_operation": "2019-12-18", "start_estimated": "", "month_disappeared": "", "go_live": "2019-12", "go_live_year_int": 2019, "name": "Boscar Grange Farm", "name_short": "Boscar Grange Farm", "owner": "Gridserve", "state": "yorkshire and humber", "country": "uk", "lat": "54.14446", "long": "-1.228101", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.14446+-1.228101", "construction_time_month": 7, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "ngen slovenia 1", "city": "Jesenice", "id": "22", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "12", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.418237", "long": "14.10062", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.youtube.com/watch?v=v9j-2lsMcJ0", "link2": "", "link3": "", "link4": ""}, "internal_id": "22", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 22, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "month_disappeared": "", "go_live": "2019-10", "go_live_year_int": 2019, "name": "ngen slovenia 1", "name_short": "ngen slovenia 1", "owner": "", "state": "", "country": "slovenia", "lat": "46.418237", "long": "14.10062", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.418237+14.10062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.youtube.com/watch?v=v9j-2lsMcJ0"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Calow Green Farm", "city": "", "id": "350", "external_id": "7140", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy (formerly Enso Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "350", "external_id": "7140", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Calow Green Farm", "external_id": "7140", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Arlington Energy (formerly Enso Energy)", "status": "operation", "date_first_heard": "2019-01-25", "start_construction": "2019-04-01", "start_operation": "2019-10-01", "start_estimated": "", "month_disappeared": "", "lat": "53.221564", "long": "-1.374255", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7140", "Record Last Updated (dd/mm/yyyy)": "12/02/2020", "Operator (or Applicant)": "Arlington Energy (formerly Enso Energy)", "Site Name": "Calow Green Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Calow Green Farm, Calow Green, Calow, Chesterfield, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "S44 5XQ", "X-coordinate": "441877", "Y-coordinate": "369573", "Planning Authority": "North East Derbyshire District Council", "Planning Application Reference": "18/01011/FL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/09/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.221564", "long": "-1.374255", "status": "planning", "mw": 20, "ext_id": "7140"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/02/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2019", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2019", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "31/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7140", "Record Last Updated (dd/mm/yyyy)": "31/03/2023", "Operator (or Applicant)": "Arlington Energy (formerly Enso Energy)", "Site Name": "Calow Green Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Calow Green Farm, Calow Green, Calow, Chesterfield, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "S44 5XQ", "X-coordinate": "441877", "Y-coordinate": "369573", "Planning Authority": "North East Derbyshire District Council", "Planning Application Reference": "18/01011/FL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/09/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/01/2022", "Under Construction": "01/04/2019", "Operational": "01/10/2019", "Heat Network Ref": "", "lat": "53.221564", "long": "-1.374255", "status": "operation", "mw": 20, "ext_id": "7140"}, "current_month": "2024-01", "dates": {"first_heard": "2020-02-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-01-25", "start_construction": "2019-04-01", "start_operation": "2019-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-10", "go_live_year_int": 2019, "name": "Calow Green Farm", "name_short": "Calow Green Farm", "owner": "Arlington Energy (formerly Enso Energy)", "state": "east midlands", "country": "uk", "lat": "53.221564", "long": "-1.374255", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.221564+-1.374255", "construction_time_month": 6, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greenfield Road", "city": "", "id": "390", "external_id": "7570", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Arlington Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-03-23", "start_construction": "2019-06-19", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "390", "external_id": "7570", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clayhill Farm - Battery Energy Storage", "external_id": "7570", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 21, "power_mw": 21, "owner": "Enso Energy Limited", "status": "operation", "date_first_heard": "2018-03-23", "start_construction": "2019-05-01", "start_operation": "2019-10-01", "start_estimated": "", "month_disappeared": "", "lat": "51.985617", "long": "-0.490707", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7570", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Arlington Energy", "Site Name": "Greenfield Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "2265", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land at Clayhill Farm, Greenfield Road, Westoning, Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK45 5JD", "X-coordinate": "503744", "Y-coordinate": "232982", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/17/06006/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/12/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/03/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "19/06/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.985617", "long": "-0.490707", "status": "construction", "mw": 40, "ext_id": "7570"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/01/2020", "to": "26/01/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Arlington Energy", "to": "Enso Energy Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Greenfield Road", "to": "Clayhill Farm - Battery Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Co-located with RE", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}, {"name": "Storage Co-location REPD Ref ID", "from": "2265", "to": "", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "40.00", "to": "21.00", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "19/06/2019", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}, {"name": "mw", "from": 40, "to": 21, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/01/2022", "to": "14/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "23/03/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/05/2019", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/09/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/10/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7570", "Record Last Updated (dd/mm/yyyy)": "14/09/2022", "Operator (or Applicant)": "Enso Energy Limited", "Site Name": "Clayhill Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "21", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Clayhill Farm, Greenfield Road, Westoning, Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK45 5JD", "X-coordinate": "503744", "Y-coordinate": "232982", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/17/06006/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/12/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/03/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/03/2021", "Under Construction": "01/05/2019", "Operational": "01/10/2019", "Heat Network Ref": "", "lat": "51.985617", "long": "-0.490707", "status": "operation", "mw": 21, "ext_id": "7570"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-20", "start_construction": "", "start_operation": "2022-09-14"}, "month_disappeared": ""}, "mw": 21, "mwh_is_estimate": true, "mwh": 21, "mwh_estimate": 21, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-03-23", "start_construction": "2019-05-01", "start_operation": "2019-10-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-10", "go_live_year_int": 2019, "name": "Clayhill Farm - Battery Energy Storage", "name_short": "Clayhill Farm", "owner": "Enso Energy Limited", "state": "eastern", "country": "uk", "lat": "51.985617", "long": "-0.490707", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.985617+-0.490707", "construction_time_month": 5, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bloxwich Battery", "city": "", "id": "447", "external_id": "8160", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "41", "power_mw": "41", "customer": "", "owner": "Gresham House Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-04-01", "start_operation": "2019-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "447", "external_id": "8160", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bloxwich Battery", "external_id": "8160", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 41, "power_mw": 41, "owner": "Gresham House Energy Storage", "status": "operation", "date_first_heard": "2020-10-02", "start_construction": "2019-04-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.590088", "long": "-2.010024", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8160", "Record Last Updated (dd/mm/yyyy)": "02/10/2020", "Operator (or Applicant)": "Gresham House Energy Storage", "Site Name": "Bloxwich Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "41.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "UNIT 5, BLOXWICH LANE INDUSTRIAL ESTATE, BLOXWICH LANE, WALSALL, WS2 8TF", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS2 8TF", "X-coordinate": "399418", "Y-coordinate": "299143", "Planning Authority": "Walsall Council", "Planning Application Reference": "16/1536", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2019", "Operational": "01/07/2019", "Heat Network Ref": "", "lat": "52.590088", "long": "-2.010024", "status": "operation", "mw": 41, "ext_id": "8160"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/10/2020", "to": "30/09/2020", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "01/07/2019", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8160", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Gresham House Energy Storage", "Site Name": "Bloxwich Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "41", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "UNIT 5, BLOXWICH LANE INDUSTRIAL ESTATE, BLOXWICH LANE, WALSALL, WS2 8TF", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS2 8TF", "X-coordinate": "399418", "Y-coordinate": "299143", "Planning Authority": "Walsall Council", "Planning Application Reference": "16/1536", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2019", "Operational": "", "Heat Network Ref": "", "lat": "52.590088", "long": "-2.010024", "status": "operation", "mw": 41, "ext_id": "8160"}, "current_month": "2024-01", "dates": {"first_heard": "2020-10-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 41, "mwh_is_estimate": true, "mwh": 41, "mwh_estimate": 41, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-02", "start_construction": "2019-04-01", "start_operation": "2019-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-07", "go_live_year_int": 2019, "name": "Bloxwich Battery", "name_short": "Bloxwich Battery", "owner": "Gresham House Energy Storage", "state": "west midlands", "country": "uk", "lat": "52.590088", "long": "-2.010024", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.590088+-2.010024", "construction_time_month": 3, "construction_speed_mwh_per_month": 13, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BES GRO", "city": "", "id": "544", "external_id": "SEE976362409624", "state": "saxony", "country": "germany", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "544", "external_id": "SEE976362409624", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "BES GRO", "external_id": "SEE976362409624", "state": "saxony", "country": "germany", "mwh": 25, "estimate_mwh": "", "power_mw": 16, "owner": "BES Groitzsch GmbH\uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": "", "month_disappeared": "", "lat": "51.140876", "long": "12.293085", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2562905"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE976362409624", "DatumLetzteAktualisierung": "2021-05-31T06:05:20.8194315", "LokationMaStRNummer": "SEL970721803719", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-05-31", "AnlagenbetreiberMastrNummer": "ABR976700826632", "Land": "84", "Bundesland": "1413", "Landkreis": "Leipzig", "Gemeinde": "Groitzsch", "Gemeindeschluessel": "14729170", "Postleitzahl": "04539", "Strasse": "Luckaer Stra\u00dfe", "StrasseNichtGefunden": "1", "Hausnummer": "29 z", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Groitzsch", "Laengengrad": "12.293085", "Breitengrad": "51.140876", "Registrierungsdatum": "2019-12-04", "Inbetriebnahmedatum": "2019-07-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BES GRO", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "17250.000", "Nettonennleistung": "16425.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "728", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16425.000", "SpeMastrNummer": "SSE988779675417", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 25, "pr_url_id": "2562905", "ext_id": "SEE976362409624", "mw": 16, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE976362409624", "DatumLetzteAktualisierung": "2021-05-31T06:05:20.8194315", "LokationMaStRNummer": "SEL970721803719", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-05-31", "AnlagenbetreiberMastrNummer": "ABR976700826632", "Land": "84", "Bundesland": "1413", "Landkreis": "Leipzig", "Gemeinde": "Groitzsch", "Gemeindeschluessel": "14729170", "Postleitzahl": "04539", "Strasse": "Luckaer Stra\u00dfe", "StrasseNichtGefunden": "1", "Hausnummer": "29 z", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Groitzsch", "Laengengrad": "12.293085", "Breitengrad": "51.140876", "Registrierungsdatum": "2019-12-04", "Inbetriebnahmedatum": "2019-07-18", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BES GRO", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "17250.000", "Nettonennleistung": "16425.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "728", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16425.000", "SpeMastrNummer": "SSE988779675417", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2562905", "owner": "BES Groitzsch GmbH\uff06 Co. KG", "mwh": 25, "ext_id": "SEE976362409624", "mw": 16, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": ""}}, "mw": 16, "mwh_is_estimate": false, "mwh": 25, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": "", "month_disappeared": "", "go_live": "2019-07", "go_live_year_int": 2019, "name": "BES GRO", "name_short": "BES GRO", "owner": "BES Groitzsch GmbH\uff06 Co. KG", "state": "saxony", "country": "germany", "lat": "51.140876", "long": "12.293085", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.140876+12.293085", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2562905"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Guildford electric buses", "city": "guildford", "id": "26", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "", "customer": "Zenobe Energy ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.205099", "long": "-0.581772", "coords_hint": "1", "use_case": "bus depot", "notes": "it is a stagecoach bus depot", "project_website": "", "link1": "https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "link2": "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/", "link3": "", "link4": ""}, "internal_id": "26", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "month_disappeared": "", "go_live": "2019-06", "go_live_year_int": 2019, "name": "Guildford electric buses", "name_short": "Guildford electric buses", "owner": "", "state": "", "country": "uk", "lat": "51.205099", "long": "-0.581772", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.205099+-0.581772", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": ["it is a stagecoach bus depot"], "links": ["https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Lascar Works ", "city": "", "id": "383", "external_id": "7464", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-03-26", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "383", "external_id": "7464", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lascar Works ", "external_id": "7464", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Anesco", "status": "operation", "date_first_heard": "2019-07-03", "start_construction": "2019-03-26", "start_operation": "2019-06-26", "start_estimated": "", "month_disappeared": "", "lat": "53.59751", "long": "-2.295057", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7464", "Record Last Updated (dd/mm/yyyy)": "03/07/2019", "Operator (or Applicant)": "Anesco", "Site Name": "Lascar Works ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Lascar Works, Tanpits Road, Bury, BL9 5BY", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BL9 5BY", "X-coordinate": "380570", "Y-coordinate": "411256", "Planning Authority": "Bury Metropolitan Borough Council", "Planning Application Reference": "62215", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "26/03/2019", "Operational": "26/06/2019", "Heat Network Ref": "", "lat": "53.59751", "long": "-2.295057", "status": "operation", "mw": 20, "ext_id": "7464"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Planning Application Reference", "from": "62215", "to": "62,215", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Planning Application Reference", "from": "62,215", "to": "62215", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/07/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/07/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7464", "Record Last Updated (dd/mm/yyyy)": "03/07/2019", "Operator (or Applicant)": "Anesco", "Site Name": "Lascar Works ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lascar Works, Tanpits Road, Bury, BL9 5BY", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BL9 5BY", "X-coordinate": "380570", "Y-coordinate": "411256", "Planning Authority": "Bury Metropolitan Borough Council", "Planning Application Reference": "62215", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "26/03/2019", "Operational": "26/06/2019", "Heat Network Ref": "", "lat": "53.59751", "long": "-2.295057", "status": "operation", "mw": 20, "ext_id": "7464"}, "current_month": "2024-01", "dates": {"first_heard": "2019-07-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-07-03", "start_construction": "2019-03-26", "start_operation": "2019-06-26", "start_estimated": "", "month_disappeared": "", "go_live": "2019-06", "go_live_year_int": 2019, "name": "Lascar Works ", "name_short": "Lascar Works ", "owner": "Anesco", "state": "north west", "country": "uk", "lat": "53.59751", "long": "-2.295057", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.59751+-2.295057", "construction_time_month": 3, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batteriespeicherkraftwerk", "city": "", "id": "532", "external_id": "SEE933095868289", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "532", "external_id": "SEE933095868289", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicherkraftwerk", "external_id": "SEE933095868289", "state": "schleswig-holstein", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "Versorgungsbetriebe Bordesholm GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": "", "month_disappeared": "", "lat": "54.174171", "long": "10.048530", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4273037"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE933095868289", "DatumLetzteAktualisierung": "2021-02-16T11:22:48.2894846", "LokationMaStRNummer": "SEL978210688311", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-16", "AnlagenbetreiberMastrNummer": "ABR911461408246", "Land": "84", "Bundesland": "1411", "Landkreis": "Rendsburg-Eckernf\u00f6rde", "Gemeinde": "Bordesholm", "Gemeindeschluessel": "01058022", "Postleitzahl": "24582", "Strasse": "Bahnhofstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "13", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bordesholm", "Laengengrad": "10.048530", "Breitengrad": "54.174171", "Registrierungsdatum": "2021-01-29", "Inbetriebnahmedatum": "2019-05-13", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicherkraftwerk", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einsatzort": "2400", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "1", "ZugeordnenteWirkleistungWechselrichter": "15750.000", "SpeMastrNummer": "SSE926907749890", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "4273037", "ext_id": "SEE933095868289", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE933095868289", "DatumLetzteAktualisierung": "2021-02-16T11:22:48.2894846", "LokationMaStRNummer": "SEL978210688311", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-16", "AnlagenbetreiberMastrNummer": "ABR911461408246", "Land": "84", "Bundesland": "1411", "Landkreis": "Rendsburg-Eckernf\u00f6rde", "Gemeinde": "Bordesholm", "Gemeindeschluessel": "01058022", "Postleitzahl": "24582", "Strasse": "Bahnhofstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "13", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bordesholm", "Laengengrad": "10.048530", "Breitengrad": "54.174171", "Registrierungsdatum": "2021-01-29", "Inbetriebnahmedatum": "2019-05-13", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicherkraftwerk", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einsatzort": "2400", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "1", "ZugeordnenteWirkleistungWechselrichter": "15750.000", "SpeMastrNummer": "SSE926907749890", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4273037", "owner": "Versorgungsbetriebe Bordesholm GmbH", "mwh": 15, "ext_id": "SEE933095868289", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": "", "month_disappeared": "", "go_live": "2019-05", "go_live_year_int": 2019, "name": "Batteriespeicherkraftwerk", "name_short": "Batteriespeicherkraftwerk", "owner": "Versorgungsbetriebe Bordesholm GmbH", "state": "schleswig-holstein", "country": "germany", "lat": "54.174171", "long": "10.048530", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.174171+10.048530", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4273037"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Asfordby Business Park (1)", "city": "", "id": "279", "external_id": "6932", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "23", "power_mw": "23", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "279", "external_id": "6932", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Asfordby Business Park (1)", "external_id": "6932", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 23, "power_mw": 23, "owner": "UK Power Reserve", "status": "operation", "date_first_heard": "2016-09-30", "start_construction": "2018-06-08", "start_operation": "2019-04-01", "start_estimated": "", "month_disappeared": "", "lat": "52.779301", "long": "-0.924335", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6932", "Record Last Updated (dd/mm/yyyy)": "28/04/2020", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Asfordby Business Park (1)", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "23.40", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, ", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE14 3JL", "X-coordinate": "472654", "Y-coordinate": "320733", "Planning Authority": "Melton Borough Council", "Planning Application Reference": "16/00522/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2019", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.779301", "long": "-0.924335", "status": "planning", "mw": 23, "ext_id": "6932"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, ", "to": "Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "08/06/2018", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/04/2019", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/04/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "28/04/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6932", "Record Last Updated (dd/mm/yyyy)": "28/04/2020", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Asfordby Business Park (1)", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "23.4", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, ", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE14 3JL", "X-coordinate": "472654", "Y-coordinate": "320733", "Planning Authority": "Melton Borough Council", "Planning Application Reference": "16/00522/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2019", "Under Construction": "08/06/2018", "Operational": "01/04/2019", "Heat Network Ref": "", "lat": "52.779301", "long": "-0.924335", "status": "operation", "mw": 23, "ext_id": "6932"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-28", "start_construction": "", "start_operation": "2020-04-28"}, "month_disappeared": ""}, "mw": 23, "mwh_is_estimate": true, "mwh": 23, "mwh_estimate": 23, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-09-30", "start_construction": "2018-06-08", "start_operation": "2019-04-01", "start_estimated": "", "month_disappeared": "", "go_live": "2019-04", "go_live_year_int": 2019, "name": "Asfordby Business Park (1)", "name_short": "Asfordby Business Park (1)", "owner": "UK Power Reserve", "state": "east midlands", "country": "uk", "lat": "52.779301", "long": "-0.924335", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.779301+-0.924335", "construction_time_month": 10, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Osaka Trains", "city": "Osaka", "id": "9", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "42", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.701231", "long": "135.494584", "coords_hint": "0", "use_case": "train station backup", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/telsa-powerpack-osaka-japan/", "link2": "", "link3": "", "link4": ""}, "internal_id": "9", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 12, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "month_disappeared": "", "go_live": "2019-03", "go_live_year_int": 2019, "name": "Osaka Trains", "name_short": "Osaka Trains", "owner": "", "state": "", "country": "japan", "lat": "34.701231", "long": "135.494584", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.701231+135.494584", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 42, "notes_split": [""], "links": ["https://www.teslarati.com/telsa-powerpack-osaka-japan/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hybridregelkraftwerk", "city": "", "id": "529", "external_id": "SEE913862454280", "state": "bremen", "country": "germany", "capacity_mwh": "14", "estimate_mwh": "", "power_mw": "18", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "529", "external_id": "SEE913862454280", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Hybridregelkraftwerk", "external_id": "SEE913862454280", "state": "bremen", "country": "germany", "mwh": 14, "estimate_mwh": "", "power_mw": 18, "owner": "swb Erzeugung AG \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": "", "month_disappeared": "", "lat": "53.058934", "long": "8.874096", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2023224"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE913862454280", "DatumLetzteAktualisierung": "2020-07-08T12:59:43.6915182", "LokationMaStRNummer": "SEL997991770299", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-23", "AnlagenbetreiberMastrNummer": "ABR901047920507", "Land": "84", "Bundesland": "1404", "Landkreis": "Bremen", "Gemeinde": "Bremen", "Gemeindeschluessel": "04011000", "Postleitzahl": "28207", "Strasse": "Hastedter Osterdeich", "StrasseNichtGefunden": "0", "Hausnummer": "255", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bremen", "Laengengrad": "8.874096", "Breitengrad": "53.058934", "Registrierungsdatum": "2019-07-03", "Inbetriebnahmedatum": "2019-03-11", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Hybridregelkraftwerk", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "18000.000", "Nettonennleistung": "18000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911945000008", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE963336172332", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "24000.000", "SpeMastrNummer": "SSE910097353135", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 14, "pr_url_id": "2023224", "ext_id": "SEE913862454280", "mw": 18, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-07-08T12:59:43.6915182", "to": "2022-02-03T10:32:33.3178725", "extra": "", "change_type": "misc"}, {"name": "Kraftwerksnummer_nv", "from": "1", "to": "0", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE913862454280", "DatumLetzteAktualisierung": "2022-02-03T10:32:33.3178725", "LokationMaStRNummer": "SEL997991770299", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-23", "AnlagenbetreiberMastrNummer": "ABR901047920507", "Land": "84", "Bundesland": "1404", "Landkreis": "Bremen", "Gemeinde": "Bremen", "Gemeindeschluessel": "04011000", "Postleitzahl": "28207", "Strasse": "Hastedter Osterdeich", "StrasseNichtGefunden": "0", "Hausnummer": "255", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Bremen", "Laengengrad": "8.874096", "Breitengrad": "53.058934", "Registrierungsdatum": "2019-07-03", "Inbetriebnahmedatum": "2019-03-11", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Hybridregelkraftwerk", "Weic_nv": "1", "Kraftwerksnummer": "BNA1936", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "18000.000", "Nettonennleistung": "18000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911945000008", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE963336172332", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "24000.000", "SpeMastrNummer": "SSE910097353135", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2023224", "owner": "swb Erzeugung AG \uff06 Co. KG", "mwh": 14, "ext_id": "SEE913862454280", "mw": 18, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": ""}}, "mw": 18, "mwh_is_estimate": false, "mwh": 14, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": "", "month_disappeared": "", "go_live": "2019-03", "go_live_year_int": 2019, "name": "Hybridregelkraftwerk", "name_short": "Hybridregelkraftwerk", "owner": "swb Erzeugung AG \uff06 Co. KG", "state": "bremen", "country": "germany", "lat": "53.058934", "long": "8.874096", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.058934+8.874096", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2023224"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "70000000", "city": "", "id": "535", "external_id": "SEE940316838242", "state": "bavaria", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "535", "external_id": "SEE940316838242", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "70000000.00", "external_id": "SEE940316838242", "state": "bavaria", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 12, "owner": "ENGIE Deutschland GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": "", "month_disappeared": "", "lat": "49.552212", "long": "12.281245", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3638550"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE940316838242", "DatumLetzteAktualisierung": "2021-10-30T04:41:59.5544412", "LokationMaStRNummer": "SEL915124720911", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2021-10-30", "AnlagenbetreiberMastrNummer": "ABR942217905054", "Land": "84", "Bundesland": "1403", "Landkreis": "Neustadt a.d. Waldnaab", "Gemeinde": "T\u00e4nnesberg", "Gemeindeschluessel": "09374159", "Postleitzahl": "92723", "Strasse": "Tanzm\u00fchle", "StrasseNichtGefunden": "0", "Hausnummer": "4", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "T\u00e4nnesberg", "Laengengrad": "12.281245", "Breitengrad": "49.552212", "Registrierungsdatum": "2020-11-25", "Inbetriebnahmedatum": "2019-03-20", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "70000000.00", "Weic": "11W0-0000-0048-K", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "12500.000", "Nettonennleistung": "12500.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911883000003", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE934725099714", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "12500.000", "SpeMastrNummer": "SSE978006940074", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 10, "pr_url_id": "3638550", "ext_id": "SEE940316838242", "mw": 12, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-01", "li": [{"name": "DatumLetzteAktualisierung", "from": "2021-10-30T04:41:59.5544412", "to": "2021-12-16T16:44:50.4826401", "extra": "", "change_type": "misc"}, {"name": "LokationMaStRNummer", "from": "SEL915124720911", "to": "SEL934186465974", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-10-30", "to": "2021-12-16", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "NetzbetreiberpruefungStatus", "from": "1", "to": "0", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-12-16", "to": "2022-03-31", "extra": "", "change_type": "misc"}, {"name": "owner", "from": "ENGIE Deutschland GmbH", "to": "ENGIE Deutschland GmbH Gesch\u00e4ftsbereich Energy Services", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "DatumLetzteAktualisierung", "from": "2021-12-16T16:44:50.4826401", "to": "2022-07-25T12:53:41.6823712", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2022-03-31", "to": "2022-07-26", "extra": "", "change_type": "misc"}, {"name": "owner", "from": "ENGIE Deutschland GmbH Gesch\u00e4ftsbereich Energy Services", "to": "ENGIE Deutschland GmbH", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2022-07-26", "to": "2022-11-10", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE940316838242", "DatumLetzteAktualisierung": "2022-07-25T12:53:41.6823712", "LokationMaStRNummer": "SEL934186465974", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-11-10", "AnlagenbetreiberMastrNummer": "ABR942217905054", "Land": "84", "Bundesland": "1403", "Landkreis": "Neustadt a.d. Waldnaab", "Gemeinde": "T\u00e4nnesberg", "Gemeindeschluessel": "09374159", "Postleitzahl": "92723", "Strasse": "Tanzm\u00fchle", "StrasseNichtGefunden": "0", "Hausnummer": "4", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "T\u00e4nnesberg", "Laengengrad": "12.281245", "Breitengrad": "49.552212", "Registrierungsdatum": "2020-11-25", "Inbetriebnahmedatum": "2019-03-20", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "70000000.00", "Weic": "11W0-0000-0048-K", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "12500.000", "Nettonennleistung": "12500.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911883000003", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE934725099714", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "12500.000", "SpeMastrNummer": "SSE978006940074", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3638550", "owner": "ENGIE Deutschland GmbH", "mwh": 10, "ext_id": "SEE940316838242", "mw": 12, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": ""}}, "mw": 12, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": "", "month_disappeared": "", "go_live": "2019-03", "go_live_year_int": 2019, "name": "70000000.00", "name_short": "70000000.00", "owner": "ENGIE Deutschland GmbH", "state": "bavaria", "country": "germany", "lat": "49.552212", "long": "12.281245", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.552212+12.281245", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3638550"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Colorado ", "city": "Weld County", "id": "24", "external_id": "", "state": "colorado", "country": "usa", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "4", "customer": "United Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.577109", "long": "-104.40854", "coords_hint": "0", "use_case": "", "notes": "could not find exact location though it is operational", "project_website": "", "link1": "https://www.youtube.com/watch?v=dyAhUREGDzA", "link2": "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/", "link3": "", "link4": ""}, "internal_id": "24", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 4, "mwh_is_estimate": false, "mwh": 16, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "month_disappeared": "", "go_live": "2019-01", "go_live_year_int": 2019, "name": "Colorado ", "name_short": "Colorado ", "owner": "", "state": "colorado", "country": "usa", "lat": "40.577109", "long": "-104.40854", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.577109+-104.40854", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["could not find exact location though it is operational"], "links": ["https://www.youtube.com/watch?v=dyAhUREGDzA", "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Upton 2", "city": "Upton County", "id": "40", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "42", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.255119", "long": "-102.246596", "coords_hint": "0", "use_case": "180MW solar farm support", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://www.energy-storage.news/us-utility-vistra-plans-texas-solar-storage-facilities-alongside-6-8gw-of-coal-retirement-by-2027/", "link2": "https://www.luminant.com/upton-2-solar-power-plant-energy-storage-facility/", "link3": "", "link4": ""}, "internal_id": "40", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 42, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-31", "start_estimated": "", "month_disappeared": "", "go_live": "2018-12", "go_live_year_int": 2018, "name": "Upton 2", "name_short": "Upton 2", "owner": "", "state": "texas", "country": "usa", "lat": "31.255119", "long": "-102.246596", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.255119+-102.246596", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/us-utility-vistra-plans-texas-solar-storage-facilities-alongside-6-8gw-of-coal-retirement-by-2027/", "https://www.luminant.com/upton-2-solar-power-plant-energy-storage-facility/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Seosan", "city": "seosan", "id": "53", "external_id": "", "state": "", "country": "south korea", "capacity_mwh": "140", "estimate_mwh": "", "power_mw": "52", "customer": "", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.636988", "long": "126.363673", "coords_hint": "1", "use_case": "65MW solar farm support", "notes": "", "project_website": "", "link1": "https://en.wikipedia.org/wiki/Battery_storage_power_station", "link2": "", "link3": "", "link4": ""}, "internal_id": "53", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 52, "mwh_is_estimate": false, "mwh": 140, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-12", "go_live_year_int": 2018, "name": "Seosan", "name_short": "Seosan", "owner": "", "state": "", "country": "south korea", "lat": "36.636988", "long": "126.363673", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.636988+126.363673", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://en.wikipedia.org/wiki/Battery_storage_power_station"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carnegie Road", "city": "Liverpool", "id": "89", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Orsted", "developer": "", "manufacturer": "NEC Energy Solutions (LG)", "type": "40ft container", "cells": "", "no_of_battery_units": "3", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.419403", "long": "-2.928747", "coords_hint": "1", "use_case": "", "notes": "according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021 ** incident: fire at the site on 15.9.2020", "project_website": "https://orsted.com/en/our-business/solar-and-battery-storage/our-solar-and-storage-centers", "link1": "https://www.energy-storage.news/nec-delivers-orsteds-first-20mw-standalone-grid-battery-project/", "link2": "https://www.neces.com/experience#project-gallery", "link3": "https://www.energy-storage.news/fire-at-20mw-uk-battery-storage-plant-in-liverpool/", "link4": ""}, "internal_id": "89", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 12, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-12", "go_live_year_int": 2018, "name": "Carnegie Road", "name_short": "Carnegie Road", "owner": "Orsted", "state": "", "country": "uk", "lat": "53.419403", "long": "-2.928747", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419403+-2.928747", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 3, "notes_split": ["according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021 ", " incident: fire at the site on 15.9.2020"], "links": ["https://www.energy-storage.news/nec-delivers-orsteds-first-20mw-standalone-grid-battery-project/", "https://www.neces.com/experience#project-gallery", "https://www.energy-storage.news/fire-at-20mw-uk-battery-storage-plant-in-liverpool/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land at Carnegie Road", "city": "", "id": "345", "external_id": "7155", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "\ufffdrsted", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-12-15", "start_construction": "2018-10-24", "start_operation": "2018-12-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "345", "external_id": "7155", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land at Carnegie Road", "external_id": "7155", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "\ufffdrsted", "status": "operation", "date_first_heard": "2016-12-15", "start_construction": "2018-10-24", "start_operation": "2018-12-24", "start_estimated": "", "month_disappeared": "", "lat": "53.419931", "long": "-2.927637", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7155", "Record Last Updated (dd/mm/yyyy)": "02/01/2019", "Operator (or Applicant)": "\ufffdrsted", "Site Name": "Land at Carnegie Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Carnegie Road, Liverpool, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338448", "Y-coordinate": "391860", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "16F/2680", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "24/10/2018", "Operational": "24/12/2018", "Heat Network Ref": "", "lat": "53.419931", "long": "-2.927637", "status": "operation", "mw": 20, "ext_id": "7155"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "02/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7155", "Record Last Updated (dd/mm/yyyy)": "02/01/2019", "Operator (or Applicant)": "\ufffdrsted", "Site Name": "Land at Carnegie Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carnegie Road, Liverpool, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L13 7HY", "X-coordinate": "338448", "Y-coordinate": "391860", "Planning Authority": "Liverpool City Council", "Planning Application Reference": "16F/2680", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "24/10/2018", "Operational": "24/12/2018", "Heat Network Ref": "", "lat": "53.419931", "long": "-2.927637", "status": "operation", "mw": 20, "ext_id": "7155"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-12-15", "start_construction": "2018-10-24", "start_operation": "2018-12-24", "start_estimated": "", "month_disappeared": "", "go_live": "2018-12", "go_live_year_int": 2018, "name": "Land at Carnegie Road", "name_short": "Land at Carnegie Road", "owner": "\ufffdrsted", "state": "north west", "country": "uk", "lat": "53.419931", "long": "-2.927637", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419931+-2.927637", "construction_time_month": 2, "construction_speed_mwh_per_month": 10, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gannawarra Solar Farm", "city": "", "id": "27", "external_id": "", "state": "victora", "country": "australia", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "25", "customer": "Edify Energy / Wirsol", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-35.734258", "long": "143.780015", "coords_hint": "1", "use_case": "60MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/", "link2": "", "link3": "", "link4": ""}, "internal_id": "27", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "Gannawarra Solar Farm", "name_short": "Gannawarra Solar Farm", "owner": "", "state": "victora", "country": "australia", "lat": "-35.734258", "long": "143.780015", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-35.734258+143.780015", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Roosecote", "city": "", "id": "264", "external_id": "6912", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Centrica", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-03-01", "start_operation": "2018-11-30", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "264", "external_id": "6912", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Roosecote", "external_id": "6912", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Centrica", "status": "operation", "date_first_heard": "2018-11-30", "start_construction": "2017-03-01", "start_operation": "2018-11-30", "start_estimated": "", "month_disappeared": "", "lat": "54.105223", "long": "-3.190031", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6912", "Record Last Updated (dd/mm/yyyy)": "30/11/2018", "Operator (or Applicant)": "Centrica", "Site Name": "Roosecote", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Roosecote coal and gas-fired power station, Barrow-in-Furness, Cumbria, UK, ", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "LA13 0PQ", "X-coordinate": "322288", "Y-coordinate": "468359", "Planning Authority": "Barrow in Furness Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2017", "Operational": "30/11/2018", "Heat Network Ref": "", "lat": "54.105223", "long": "-3.190031", "status": "operation", "mw": 49, "ext_id": "6912"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/11/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "30/11/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6912", "Record Last Updated (dd/mm/yyyy)": "30/11/2018", "Operator (or Applicant)": "Centrica", "Site Name": "Roosecote", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Roosecote coal and gas-fired power station, Barrow-in-Furness, Cumbria, UK, ", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "LA13 0PQ", "X-coordinate": "322288", "Y-coordinate": "468359", "Planning Authority": "Barrow in Furness Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2017", "Operational": "30/11/2018", "Heat Network Ref": "", "lat": "54.105223", "long": "-3.190031", "status": "operation", "mw": 49, "ext_id": "6912"}, "current_month": "2024-01", "dates": {"first_heard": "2018-11-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-11-30", "start_construction": "2017-03-01", "start_operation": "2018-11-30", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "Roosecote", "name_short": "Roosecote", "owner": "Centrica", "state": "north west", "country": "uk", "lat": "54.105223", "long": "-3.190031", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.105223+-3.190031", "construction_time_month": 20, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Creyke Beck", "city": "", "id": "338", "external_id": "7122", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-06-15", "start_construction": "2018-03-01", "start_operation": "2018-11-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "338", "external_id": "7122", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Creyke Beck", "external_id": "7122", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "operation", "date_first_heard": "2017-06-15", "start_construction": "2018-03-01", "start_operation": "2018-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.798272", "long": "-0.421018", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7122", "Record Last Updated (dd/mm/yyyy)": "28/01/2019", "Operator (or Applicant)": "Statera Energy", "Site Name": "Creyke Beck", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land to the south of, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504098", "Y-coordinate": "434708", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01372/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2018", "Operational": "01/11/2018", "Heat Network Ref": "", "lat": "53.798272", "long": "-0.421018", "status": "operation", "mw": 49, "ext_id": "7122"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "28/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7122", "Record Last Updated (dd/mm/yyyy)": "28/01/2019", "Operator (or Applicant)": "Statera Energy", "Site Name": "Creyke Beck", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south of, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504098", "Y-coordinate": "434708", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01372/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2018", "Operational": "01/11/2018", "Heat Network Ref": "", "lat": "53.798272", "long": "-0.421018", "status": "operation", "mw": 49, "ext_id": "7122"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-06-15", "start_construction": "2018-03-01", "start_operation": "2018-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "Creyke Beck", "name_short": "Creyke Beck", "owner": "Statera Energy", "state": "yorkshire and humber", "country": "uk", "lat": "53.798272", "long": "-0.421018", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.798272+-0.421018", "construction_time_month": 8, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BES BEN", "city": "", "id": "539", "external_id": "SEE963081865633", "state": "saxony", "country": "germany", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "539", "external_id": "SEE963081865633", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "BES BEN", "external_id": "SEE963081865633", "state": "saxony", "country": "germany", "mwh": 25, "estimate_mwh": "", "power_mw": 16, "owner": "BES Bennewitz GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": "", "month_disappeared": "", "lat": "51.356015", "long": "12.707130", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2562804"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE963081865633", "DatumLetzteAktualisierung": "2021-08-16T09:08:51.5029607", "LokationMaStRNummer": "SEL989511155808", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-08-16", "AnlagenbetreiberMastrNummer": "ABR921213385473", "Land": "84", "Bundesland": "1413", "Landkreis": "Leipzig", "Gemeinde": "Bennewitz", "Gemeindeschluessel": "14729030", "Postleitzahl": "04828", "Strasse": "Parkstra\u00dfe", "StrasseNichtGefunden": "1", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Bennewitz", "Laengengrad": "12.707130", "Breitengrad": "51.356015", "Registrierungsdatum": "2019-12-04", "Inbetriebnahmedatum": "2018-11-14", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BES BEN", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "16425.000", "Nettonennleistung": "16425.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "728", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16425.000", "SpeMastrNummer": "SSE940380794697", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 25, "pr_url_id": "2562804", "ext_id": "SEE963081865633", "mw": 16, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE963081865633", "DatumLetzteAktualisierung": "2021-08-16T09:08:51.5029607", "LokationMaStRNummer": "SEL989511155808", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-08-16", "AnlagenbetreiberMastrNummer": "ABR921213385473", "Land": "84", "Bundesland": "1413", "Landkreis": "Leipzig", "Gemeinde": "Bennewitz", "Gemeindeschluessel": "14729030", "Postleitzahl": "04828", "Strasse": "Parkstra\u00dfe", "StrasseNichtGefunden": "1", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Bennewitz", "Laengengrad": "12.707130", "Breitengrad": "51.356015", "Registrierungsdatum": "2019-12-04", "Inbetriebnahmedatum": "2018-11-14", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BES BEN", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "16425.000", "Nettonennleistung": "16425.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "728", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16425.000", "SpeMastrNummer": "SSE940380794697", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2562804", "owner": "BES Bennewitz GmbH \uff06 Co. KG", "mwh": 25, "ext_id": "SEE963081865633", "mw": 16, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": ""}}, "mw": 16, "mwh_is_estimate": false, "mwh": 25, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "BES BEN", "name_short": "BES BEN", "owner": "BES Bennewitz GmbH \uff06 Co. KG", "state": "saxony", "country": "germany", "lat": "51.356015", "long": "12.707130", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.356015+12.707130", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2562804"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Broxburn ", "city": "", "id": "262", "external_id": "6910", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-06", "start_construction": "2017-08-15", "start_operation": "2018-09-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "262", "external_id": "6910", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Broxburn ", "external_id": "6910", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Renewable Energy Systems (RES)", "status": "operation", "date_first_heard": "2017-03-06", "start_construction": "2017-08-15", "start_operation": "2018-09-15", "start_estimated": "", "month_disappeared": "", "lat": "55.919243", "long": "-3.455353", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6910", "Record Last Updated (dd/mm/yyyy)": "18/04/2019", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Broxburn ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land at Lookabootye, by Broxburn, adjacent to the Lookabootye substation.\n", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "309143", "Y-coordinate": "670530", "Planning Authority": "West Lothian Council", "Planning Application Reference": "LIVE/0502/FUL/16", "Appeal Reference": "PPA-400-2073", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "25/11/2016", "Appeal Lodged": "15/12/2016", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "06/03/2017", "Planning Permission Granted": "06/03/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/08/2017", "Operational": "15/09/2018", "Heat Network Ref": "", "lat": "55.919243", "long": "-3.455353", "status": "operation", "mw": 20, "ext_id": "6910"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/04/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "18/04/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6910", "Record Last Updated (dd/mm/yyyy)": "18/04/2019", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Broxburn ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Lookabootye, by Broxburn, adjacent to the Lookabootye substation.\n", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "309143", "Y-coordinate": "670530", "Planning Authority": "West Lothian Council", "Planning Application Reference": "LIVE/0502/FUL/16", "Appeal Reference": "PPA-400-2073", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "25/11/2016", "Appeal Lodged": "15/12/2016", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "06/03/2017", "Planning Permission Granted": "06/03/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/08/2017", "Operational": "15/09/2018", "Heat Network Ref": "", "lat": "55.919243", "long": "-3.455353", "status": "operation", "mw": 20, "ext_id": "6910"}, "current_month": "2024-01", "dates": {"first_heard": "2019-04-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-03-06", "start_construction": "2017-08-15", "start_operation": "2018-09-15", "start_estimated": "", "month_disappeared": "", "go_live": "2018-09", "go_live_year_int": 2018, "name": "Broxburn ", "name_short": "Broxburn ", "owner": "Renewable Energy Systems (RES)", "state": "scotland", "country": "uk", "lat": "55.919243", "long": "-3.455353", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.919243+-3.455353", "construction_time_month": 13, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Energiewende-Speicher", "city": "", "id": "533", "external_id": "SEE935506652999", "state": "lower saxony", "country": "germany", "capacity_mwh": "26", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "533", "external_id": "SEE935506652999", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Energiewende-Speicher", "external_id": "SEE935506652999", "state": "lower saxony", "country": "germany", "mwh": 26, "estimate_mwh": "", "power_mw": 11, "owner": "be.storaged GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": "", "month_disappeared": "", "lat": "53.375414", "long": "8.125477", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2940061"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE935506652999", "DatumLetzteAktualisierung": "2020-09-23T14:27:02.7620630", "LokationMaStRNummer": "SEL927843170113", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2020-09-23", "AnlagenbetreiberMastrNummer": "ABR999566358659", "Land": "84", "Bundesland": "1408", "Landkreis": "Friesland", "Gemeinde": "Varel", "Gemeindeschluessel": "03455026", "Postleitzahl": "26316", "Strasse": "Oldenburger Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "69 B", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Varel", "Laengengrad": "8.125477", "Breitengrad": "53.375414", "Registrierungsdatum": "2020-04-08", "Inbetriebnahmedatum": "2018-08-02", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Energiewende-Speicher", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "11900.000", "Nettonennleistung": "11900.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "0000000000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "730", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11900.000", "SpeMastrNummer": "SSE992131898185", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 26, "pr_url_id": "2940061", "ext_id": "SEE935506652999", "mw": 11, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-01", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2020-09-23", "to": "2021-12-28", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-09-23T14:27:02.7620630", "to": "2022-03-03T11:54:48.0427347", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-12-28", "to": "2022-04-27", "extra": "", "change_type": "misc"}, {"name": "Inbetriebnahmedatum", "from": "2018-08-02", "to": "2018-05-31", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE935506652999", "DatumLetzteAktualisierung": "2022-03-03T11:54:48.0427347", "LokationMaStRNummer": "SEL927843170113", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-04-27", "AnlagenbetreiberMastrNummer": "ABR999566358659", "Land": "84", "Bundesland": "1408", "Landkreis": "Friesland", "Gemeinde": "Varel", "Gemeindeschluessel": "03455026", "Postleitzahl": "26316", "Strasse": "Oldenburger Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "69 B", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Varel", "Laengengrad": "8.125477", "Breitengrad": "53.375414", "Registrierungsdatum": "2020-04-08", "Inbetriebnahmedatum": "2018-05-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Energiewende-Speicher", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "11900.000", "Nettonennleistung": "11900.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "0000000000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "730", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11900.000", "SpeMastrNummer": "SSE992131898185", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2940061", "owner": "be.storaged GmbH", "mwh": 26, "ext_id": "SEE935506652999", "mw": 11, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": ""}}, "mw": 11, "mwh_is_estimate": false, "mwh": 26, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": "", "month_disappeared": "", "go_live": "2018-08", "go_live_year_int": 2018, "name": "Energiewende-Speicher", "name_short": "Energiewende-Speicher", "owner": "be.storaged GmbH", "state": "lower saxony", "country": "germany", "lat": "53.375414", "long": "8.125477", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.375414+8.125477", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2940061"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Samoa", "city": "", "id": "30", "external_id": "", "state": "", "country": "samoa", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-13.885669", "long": "-171.884245", "coords_hint": "1", "use_case": "island", "notes": "2 locations at power station and airport", "project_website": "", "link1": "https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/", "link2": "", "link3": "", "link4": ""}, "internal_id": "30", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 13, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Samoa", "name_short": "Samoa", "owner": "", "state": "", "country": "samoa", "lat": "-13.885669", "long": "-171.884245", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-13.885669+-171.884245", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2 locations at power station and airport"], "links": ["https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Vista", "city": "Vista", "id": "49", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "40", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.20395", "long": "-117.253731", "coords_hint": "0", "use_case": "", "notes": "no source about the capacity", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://www.mapsearch.com/power-plant/vista-energy-storage-system/", "link3": "", "link4": ""}, "internal_id": "49", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 40, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Vista", "name_short": "Vista", "owner": "", "state": "california", "country": "usa", "lat": "33.20395", "long": "-117.253731", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.20395+-117.253731", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["no source about the capacity"], "links": ["https://www.lspower.com/project-map/", "https://www.mapsearch.com/power-plant/vista-energy-storage-system/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Port of Tyne", "city": "", "id": "282", "external_id": "6976", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Foresight", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2018-04-01", "start_operation": "2018-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "282", "external_id": "6976", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Port of Tyne", "external_id": "6976", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Foresight", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2018-04-01", "start_operation": "2018-07-01", "start_estimated": "", "month_disappeared": "", "lat": "54.977266", "long": "-1.455914", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6976", "Record Last Updated (dd/mm/yyyy)": "09/05/2019", "Operator (or Applicant)": "Foresight", "Site Name": "Port of Tyne", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Port of Tyne, Tyne Dock, South Shields, Tyne & Wear", "County": "Tyne and Wear", "Region": "North East", "Country": "England", "Post Code": "NE34 9PT", "X-coordinate": "434923", "Y-coordinate": "564875", "Planning Authority": "South Tyneside Metropolitan Borough Council", "Planning Application Reference": "ST/0867/16/FUL\ufffd", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2018", "Operational": "01/07/2018", "Heat Network Ref": "", "lat": "54.977266", "long": "-1.455914", "status": "operation", "mw": 35, "ext_id": "6976"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/05/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/05/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6976", "Record Last Updated (dd/mm/yyyy)": "09/05/2019", "Operator (or Applicant)": "Foresight", "Site Name": "Port of Tyne", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Port of Tyne, Tyne Dock, South Shields, Tyne & Wear", "County": "Tyne and Wear", "Region": "North East", "Country": "England", "Post Code": "NE34 9PT", "X-coordinate": "434923", "Y-coordinate": "564875", "Planning Authority": "South Tyneside Metropolitan Borough Council", "Planning Application Reference": "ST/0867/16/FUL\ufffd", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2018", "Operational": "01/07/2018", "Heat Network Ref": "", "lat": "54.977266", "long": "-1.455914", "status": "operation", "mw": 35, "ext_id": "6976"}, "current_month": "2024-01", "dates": {"first_heard": "2019-05-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-21", "start_construction": "2018-04-01", "start_operation": "2018-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Port of Tyne", "name_short": "Port of Tyne", "owner": "Foresight", "state": "north east", "country": "uk", "lat": "54.977266", "long": "-1.455914", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.977266+-1.455914", "construction_time_month": 3, "construction_speed_mwh_per_month": 11, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hybridspeicher AU", "city": "", "id": "524", "external_id": "SEE900291433160", "state": "bavaria", "country": "germany", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "524", "external_id": "SEE900291433160", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Hybridspeicher AU", "external_id": "SEE900291433160", "state": "bavaria", "country": "germany", "mwh": 8, "estimate_mwh": "", "power_mw": 16, "owner": "Allg\u00e4uer \u00dcberlandwerk GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": "", "month_disappeared": "", "lat": "47.685476", "long": "10.322080", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2377745"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE900291433160", "DatumLetzteAktualisierung": "2019-12-16T10:56:28.9742126", "LokationMaStRNummer": "SEL905749208932", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-01-27", "AnlagenbetreiberMastrNummer": "ABR917063786638", "Land": "84", "Bundesland": "1403", "Landkreis": "Oberallg\u00e4u", "Gemeinde": "Sulzberg", "Gemeindeschluessel": "09780140", "Postleitzahl": "87477", "Strasse": "Au", "StrasseNichtGefunden": "0", "Hausnummer": "7", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Sulzberg", "Laengengrad": "10.322080", "Breitengrad": "47.685476", "Registrierungsdatum": "2019-12-16", "Inbetriebnahmedatum": "2018-07-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Hybridspeicher AU", "Weic_nv": "1", "Kraftwerksnummer": "BNA1939", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "16000.000", "Nettonennleistung": "16000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9904254000009", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "BestandteilGrenzkraftwerk": "0", "ZugeordnenteWirkleistungWechselrichter": "16000.000", "SpeMastrNummer": "SSE991759625937", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 8, "pr_url_id": "2377745", "ext_id": "SEE900291433160", "mw": 16, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE900291433160", "DatumLetzteAktualisierung": "2019-12-16T10:56:28.9742126", "LokationMaStRNummer": "SEL905749208932", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-01-27", "AnlagenbetreiberMastrNummer": "ABR917063786638", "Land": "84", "Bundesland": "1403", "Landkreis": "Oberallg\u00e4u", "Gemeinde": "Sulzberg", "Gemeindeschluessel": "09780140", "Postleitzahl": "87477", "Strasse": "Au", "StrasseNichtGefunden": "0", "Hausnummer": "7", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Sulzberg", "Laengengrad": "10.322080", "Breitengrad": "47.685476", "Registrierungsdatum": "2019-12-16", "Inbetriebnahmedatum": "2018-07-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Hybridspeicher AU", "Weic_nv": "1", "Kraftwerksnummer": "BNA1939", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "16000.000", "Nettonennleistung": "16000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9904254000009", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "BestandteilGrenzkraftwerk": "0", "ZugeordnenteWirkleistungWechselrichter": "16000.000", "SpeMastrNummer": "SSE991759625937", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2377745", "owner": "Allg\u00e4uer \u00dcberlandwerk GmbH", "mwh": 8, "ext_id": "SEE900291433160", "mw": 16, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": ""}}, "mw": 16, "mwh_is_estimate": false, "mwh": 8, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Hybridspeicher AU", "name_short": "Hybridspeicher AU", "owner": "Allg\u00e4uer \u00dcberlandwerk GmbH", "state": "bavaria", "country": "germany", "lat": "47.685476", "long": "10.322080", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:47.685476+10.322080", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2377745"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Burton", "city": "", "id": "269", "external_id": "6920", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-09-30", "start_construction": "2018-01-25", "start_operation": "2018-06-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "269", "external_id": "6920", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Burton", "external_id": "6920", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "EDF Energy Renewables", "status": "operation", "date_first_heard": "2016-09-30", "start_construction": "2018-01-25", "start_operation": "2018-06-25", "start_estimated": "", "month_disappeared": "", "lat": "53.364529", "long": "-0.798356", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6920", "Record Last Updated (dd/mm/yyyy)": "27/11/2018", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "West Burton", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "West Burton Power Station North Road West Burton Retford Nottinghamshire ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 9BL", "X-coordinate": "480060", "Y-coordinate": "385968", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "16/00954/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "25/01/2018", "Operational": "25/06/2018", "Heat Network Ref": "", "lat": "53.364529", "long": "-0.798356", "status": "operation", "mw": 49, "ext_id": "6920"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/11/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/11/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6920", "Record Last Updated (dd/mm/yyyy)": "27/11/2018", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "West Burton", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Burton Power Station North Road West Burton Retford Nottinghamshire ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 9BL", "X-coordinate": "480060", "Y-coordinate": "385968", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "16/00954/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "25/01/2018", "Operational": "25/06/2018", "Heat Network Ref": "", "lat": "53.364529", "long": "-0.798356", "status": "operation", "mw": 49, "ext_id": "6920"}, "current_month": "2024-01", "dates": {"first_heard": "2018-11-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-09-30", "start_construction": "2018-01-25", "start_operation": "2018-06-25", "start_estimated": "", "month_disappeared": "", "go_live": "2018-06", "go_live_year_int": 2018, "name": "West Burton", "name_short": "West Burton", "owner": "EDF Energy Renewables", "state": "east midlands", "country": "uk", "lat": "53.364529", "long": "-0.798356", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.364529+-0.798356", "construction_time_month": 5, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pinal Central Solar Energy Center", "city": "", "id": "31", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Salt River Project", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.868983", "long": "-111.557171", "coords_hint": "1", "use_case": "20MW solar farm support", "notes": "Added 40 mwh as the youtube video said it can power with 10MW for 4 hours", "project_website": "", "link1": "https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "link2": "https://www.youtube.com/watch?v=e9RuVL3t4jQ", "link3": "", "link4": ""}, "internal_id": "31", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Pinal Central Solar Energy Center", "name_short": "Pinal Central Solar", "owner": "", "state": "arizona", "country": "usa", "lat": "32.868983", "long": "-111.557171", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.868983+-111.557171", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Added 40 mwh as the youtube video said it can power with 10MW for 4 hours"], "links": ["https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "https://www.youtube.com/watch?v=e9RuVL3t4jQ"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Terhills", "city": "Terhills", "id": "32", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "29", "estimate_mwh": "", "power_mw": "18", "customer": "Restore", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.006595", "long": "5.711134", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/", "link2": "", "link3": "", "link4": ""}, "internal_id": "32", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 18, "mwh_is_estimate": false, "mwh": 29, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Terhills", "name_short": "Terhills", "owner": "", "state": "", "country": "belgium", "lat": "51.006595", "long": "5.711134", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.006595+5.711134", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Tynemouth Energy Storage System (TESS)", "city": "", "id": "270", "external_id": "6925", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Enel (formerly Element Power)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-12", "start_construction": "2018-12-20", "start_operation": "2018-05-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "270", "external_id": "6925", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tynemouth Energy Storage System (TESS)", "external_id": "6925", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Enel (formerly Element Power)", "status": "operation", "date_first_heard": "2016-10-12", "start_construction": "2018-12-20", "start_operation": "2018-05-25", "start_estimated": "", "month_disappeared": "", "lat": "55.025976", "long": "-1.503105", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6925", "Record Last Updated (dd/mm/yyyy)": "03/08/2018", "Operator (or Applicant)": "Enel (formerly Element Power)", "Site Name": "Tynemouth Energy Storage System (TESS)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Newcastle", "County": "Tyne and Wear", "Region": "North East", "Country": "England", "Post Code": "NE27 0NB", "X-coordinate": "431864", "Y-coordinate": "570273", "Planning Authority": "North Tyneside Council", "Planning Application Reference": "16/01451/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/10/2019", "Under Construction": "20/12/2018", "Operational": "25/05/2018", "Heat Network Ref": "", "lat": "55.025976", "long": "-1.503105", "status": "operation", "mw": 25, "ext_id": "6925"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/08/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/08/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6925", "Record Last Updated (dd/mm/yyyy)": "03/08/2018", "Operator (or Applicant)": "Enel (formerly Element Power)", "Site Name": "Tynemouth Energy Storage System (TESS)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newcastle", "County": "Tyne and Wear", "Region": "North East", "Country": "England", "Post Code": "NE27 0NB", "X-coordinate": "431864", "Y-coordinate": "570273", "Planning Authority": "North Tyneside Council", "Planning Application Reference": "16/01451/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/09/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/10/2019", "Under Construction": "20/12/2018", "Operational": "25/05/2018", "Heat Network Ref": "", "lat": "55.025976", "long": "-1.503105", "status": "operation", "mw": 25, "ext_id": "6925"}, "current_month": "2024-01", "dates": {"first_heard": "2018-08-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-12", "start_construction": "2018-12-20", "start_operation": "2018-05-25", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Tynemouth Energy Storage System (TESS)", "name_short": "Tynemouth Energy Storage System (TE...", "owner": "Enel (formerly Element Power)", "state": "north east", "country": "uk", "lat": "55.025976", "long": "-1.503105", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.025976+-1.503105", "construction_time_month": -7, "construction_speed_mwh_per_month": -3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pen y Cymoedd Energy Storage", "city": "", "id": "272", "external_id": "6927", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Vattenfall", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-11-01", "start_operation": "2018-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "272", "external_id": "6927", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pen y Cymoedd Energy Storage", "external_id": "6927", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 22, "power_mw": 22, "owner": "Vattenfall", "status": "operation", "date_first_heard": "2011-11-18", "start_construction": "2017-11-01", "start_operation": "2018-05-01", "start_estimated": "", "month_disappeared": "", "lat": "51.655543", "long": "-3.69573", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6927", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Vattenfall", "Site Name": "Pen y Cymoedd Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4595", "Installed Capacity (MWelec)": "22.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Pen y Cymoedd, Neath Port Talbot ", "County": "Neath Port Talbot", "Region": "Wales", "Country": "Wales", "Post Code": "SA13 3HF", "X-coordinate": "282793", "Y-coordinate": "196557", "Planning Authority": "Neath Port Talbot County Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/11/2017", "Operational": "01/05/2018", "Heat Network Ref": "", "lat": "51.655543", "long": "-3.69573", "status": "operation", "mw": 22, "ext_id": "6927"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Planning Authority", "from": "Neath Port Talbot County Borough Council", "to": "Neath Port Talbot Council", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "", "to": "P2009/1053", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "", "to": "19/11/2009", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/11/2011", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6927", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Vattenfall", "Site Name": "Pen y Cymoedd Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4595", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Pen y Cymoedd, Neath Port Talbot ", "County": "Neath Port Talbot", "Region": "Wales", "Country": "Wales", "Post Code": "SA13 3HF", "X-coordinate": "282793", "Y-coordinate": "196557", "Planning Authority": "Neath Port Talbot Council", "Planning Application Reference": "P2009/1053", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2009", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2011", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/11/2017", "Operational": "01/05/2018", "Heat Network Ref": "", "lat": "51.655543", "long": "-3.69573", "status": "operation", "mw": 22, "ext_id": "6927"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 22, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2011-11-18", "start_construction": "2017-11-01", "start_operation": "2018-05-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Pen y Cymoedd Energy Storage", "name_short": "Pen y Cymoedd", "owner": "Vattenfall", "state": "wales", "country": "uk", "lat": "51.655543", "long": "-3.69573", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.655543+-3.69573", "construction_time_month": 6, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane", "city": "", "id": "673", "external_id": "7148", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Walker & Son (Hauliers) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-10-06", "start_construction": "2018-03-01", "start_operation": "2018-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "673", "external_id": "7148", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane", "external_id": "7148", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Walker & Son (Hauliers) Limited", "status": "operation", "date_first_heard": "2017-10-06", "start_construction": "2018-03-01", "start_operation": "2018-05-01", "start_estimated": "", "month_disappeared": "", "lat": "53.718198", "long": "-1.276097", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7148", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447870", "Y-coordinate": "424886", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "17/01857/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2018", "Operational": "01/05/2018", "Heat Network Ref": "", "": "", "lat": "53.718198", "long": "-1.276097", "status": "operation", "mw": 20, "ext_id": "7148"}, "first_month": "2022-04", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/01/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "19/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7148", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447870", "Y-coordinate": "424886", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "17/01857/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/03/2018", "Operational": "01/05/2018", "Heat Network Ref": "", "lat": "53.718198", "long": "-1.276097", "status": "operation", "mw": 20, "ext_id": "7148"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-10-06", "start_construction": "2018-03-01", "start_operation": "2018-05-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Kirkhaw Lane", "name_short": "Kirkhaw Lane", "owner": "Walker & Son (Hauliers) Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.718198", "long": "-1.276097", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.718198+-1.276097", "construction_time_month": 2, "construction_speed_mwh_per_month": 10, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jardelund", "city": "Jardelund", "id": "90", "external_id": "SEE999790559914", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "51", "estimate_mwh": "", "power_mw": "48", "customer": "", "owner": "EnspireME (JV Eneco / Mitsubishi)", "developer": "", "manufacturer": "NEC Energy Solutions (LG)", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-10-01", "start_operation": "2018-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.851435", "long": "9.194775", "coords_hint": "1", "use_case": "frequency balancing", "notes": "according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021", "project_website": "https://www.neces.com/project/jardelund-germany-48-mw-51-mwh-2/", "link1": "https://www.youtube.com/watch?v=UheTmGO7BN0", "link2": "https://www.energy-storage.news/50mwh-battery-completed-in-germany-claims-europes-largest-crown/", "link3": "", "link4": ""}, "internal_id": "90", "external_id": "SEE999790559914", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "BESS Jardelund", "external_id": "SEE999790559914", "state": "schleswig-holstein", "country": "germany", "mwh": 48, "estimate_mwh": "", "power_mw": 48, "owner": "EnspireME", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-04-01", "start_estimated": "", "month_disappeared": "", "lat": "54.850889", "long": "9.194541", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3984077"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE999790559914", "DatumLetzteAktualisierung": "2021-01-18T13:43:38.4221011", "LokationMaStRNummer": "SEL926192843211", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-12", "AnlagenbetreiberMastrNummer": "ABR985310436612", "Land": "84", "Bundesland": "1411", "Landkreis": "Schleswig-Flensburg", "Gemeinde": "Jardelund", "Gemeindeschluessel": "01059129", "Postleitzahl": "24994", "Strasse": "Grenzstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "3 A", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Jardelund", "Laengengrad": "9.194541", "Breitengrad": "54.850889", "Registrierungsdatum": "2021-01-18", "Inbetriebnahmedatum": "2018-04-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BESS Jardelund", "Weic": "11W0-0000-0117-U", "Weic_nv": "0", "Kraftwerksnummer": "BNA1942", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "48000.000", "Nettonennleistung": "48000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9903067000008", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "52800.000", "SpeMastrNummer": "SSE963357090257", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 48, "pr_url_id": "3984077", "ext_id": "SEE999790559914", "mw": 48, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-12", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2021-02-12", "to": "2022-11-11", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE999790559914", "DatumLetzteAktualisierung": "2021-01-18T13:43:38.4221011", "LokationMaStRNummer": "SEL926192843211", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-11-11", "AnlagenbetreiberMastrNummer": "ABR985310436612", "Land": "84", "Bundesland": "1411", "Landkreis": "Schleswig-Flensburg", "Gemeinde": "Jardelund", "Gemeindeschluessel": "01059129", "Postleitzahl": "24994", "Strasse": "Grenzstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "3 A", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Jardelund", "Laengengrad": "9.194541", "Breitengrad": "54.850889", "Registrierungsdatum": "2021-01-18", "Inbetriebnahmedatum": "2018-04-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "BESS Jardelund", "Weic": "11W0-0000-0117-U", "Weic_nv": "0", "Kraftwerksnummer": "BNA1942", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "48000.000", "Nettonennleistung": "48000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9903067000008", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "52800.000", "SpeMastrNummer": "SSE963357090257", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3984077", "owner": "EnspireME", "mwh": 48, "ext_id": "SEE999790559914", "mw": 48, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2018-04-01", "start_estimated": ""}}, "mw": 48, "mwh_is_estimate": false, "mwh": 48, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2017-10-01", "start_operation": "2018-04-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-04", "go_live_year_int": 2018, "name": "BESS Jardelund", "name_short": "BESS Jardelund", "owner": "EnspireME", "state": "schleswig-holstein", "country": "germany", "lat": "54.850889", "long": "9.194541", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.850889+9.194541", "construction_time_month": 6, "construction_speed_mwh_per_month": 8, "no_of_battery_units": 0, "notes_split": ["according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021"], "links": ["https://www.youtube.com/watch?v=UheTmGO7BN0", "https://www.energy-storage.news/50mwh-battery-completed-in-germany-claims-europes-largest-crown/", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3984077"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Nevendon", "city": "", "id": "271", "external_id": "6926", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Belectric UK / Foresight", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2018-10-15", "start_operation": "2018-03-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "271", "external_id": "6926", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Nevendon", "external_id": "6926", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Belectric UK / Foresight", "status": "operation", "date_first_heard": "2017-03-28", "start_construction": "2018-10-15", "start_operation": "2018-03-15", "start_estimated": "", "month_disappeared": "", "lat": "51.593336", "long": "0.494883", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6926", "Record Last Updated (dd/mm/yyyy)": "28/03/2017", "Operator (or Applicant)": "Belectric UK / Foresight", "Site Name": "Nevendon", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Nevendon, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS14 3JH", "X-coordinate": "572912", "Y-coordinate": "191225", "Planning Authority": "Essex County Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/10/2018", "Operational": "15/03/2018", "Heat Network Ref": "", "lat": "51.593336", "long": "0.494883", "status": "operation", "mw": 10, "ext_id": "6926"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Nevendon, Essex", "to": "Nevendon,", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/03/2017", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "28/03/2017", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6926", "Record Last Updated (dd/mm/yyyy)": "28/03/2017", "Operator (or Applicant)": "Belectric UK / Foresight", "Site Name": "Nevendon", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Nevendon,", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS14 3JH", "X-coordinate": "572912", "Y-coordinate": "191225", "Planning Authority": "Essex County Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/10/2018", "Operational": "15/03/2018", "Heat Network Ref": "", "lat": "51.593336", "long": "0.494883", "status": "operation", "mw": 10, "ext_id": "6926"}, "current_month": "2024-01", "dates": {"first_heard": "2017-03-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-03-28", "start_construction": "2018-10-15", "start_operation": "2018-03-15", "start_estimated": "", "month_disappeared": "", "go_live": "2018-03", "go_live_year_int": 2018, "name": "Nevendon", "name_short": "Nevendon", "owner": "Belectric UK / Foresight", "state": "eastern", "country": "uk", "lat": "51.593336", "long": "0.494883", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.593336+0.494883", "construction_time_month": -7, "construction_speed_mwh_per_month": -1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Claredown Farm", "city": "", "id": "274", "external_id": "6945", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Zenobe (formerly Energy Reservoir 15)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-06-05", "start_construction": "2017-09-01", "start_operation": "2018-02-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "274", "external_id": "6945", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Claredown Farm", "external_id": "6945", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Zenobe (formerly Energy Reservoir 15)", "status": "operation", "date_first_heard": "2017-06-05", "start_construction": "2017-09-01", "start_operation": "2018-02-27", "start_estimated": "", "month_disappeared": "", "lat": "52.070683", "long": "0.607816", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6945", "Record Last Updated (dd/mm/yyyy)": "26/11/2019", "Operator (or Applicant)": "Zenobe (formerly Energy Reservoir 15)", "Site Name": "Claredown Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land at Claredown Farm, Hickford Hill, Belchamp St Paul\n", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CO10 7DW", "X-coordinate": "578833", "Y-coordinate": "244577", "Planning Authority": "Braintree District Council", "Planning Application Reference": "17/00583/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2017", "Operational": "27/02/2018", "Heat Network Ref": "", "lat": "52.070683", "long": "0.607816", "status": "operation", "mw": 20, "ext_id": "6945"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/11/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "26/11/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6945", "Record Last Updated (dd/mm/yyyy)": "26/11/2019", "Operator (or Applicant)": "Zenobe (formerly Energy Reservoir 15)", "Site Name": "Claredown Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Claredown Farm, Hickford Hill, Belchamp St Paul\n", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CO10 7DW", "X-coordinate": "578833", "Y-coordinate": "244577", "Planning Authority": "Braintree District Council", "Planning Application Reference": "17/00583/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2017", "Operational": "27/02/2018", "Heat Network Ref": "", "lat": "52.070683", "long": "0.607816", "status": "operation", "mw": 20, "ext_id": "6945"}, "current_month": "2024-01", "dates": {"first_heard": "2019-11-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-06-05", "start_construction": "2017-09-01", "start_operation": "2018-02-27", "start_estimated": "", "month_disappeared": "", "go_live": "2018-02", "go_live_year_int": 2018, "name": "Claredown Farm", "name_short": "Claredown Farm", "owner": "Zenobe (formerly Energy Reservoir 15)", "state": "eastern", "country": "uk", "lat": "52.070683", "long": "0.607816", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.070683+0.607816", "construction_time_month": 5, "construction_speed_mwh_per_month": 4, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Huggin's Hall", "city": "", "id": "341", "external_id": "7129", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Low Carbon", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2017-08-13", "start_operation": "2018-02-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "341", "external_id": "7129", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Huggin's Hall", "external_id": "7129", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Low Carbon", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2017-08-13", "start_operation": "2018-02-13", "start_estimated": "", "month_disappeared": "", "lat": "51.093574", "long": "0.508258", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7129", "Record Last Updated (dd/mm/yyyy)": "23/10/2018", "Operator (or Applicant)": "Low Carbon", "Site Name": "Huggin's Hall", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land at Huggin's Hall, Glassenbury Road, Cranbrook, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "N17 2QE", "X-coordinate": "575739", "Y-coordinate": "135688", "Planning Authority": "Tunbridge Wells Borough Council", "Planning Application Reference": "16/06052/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "13/08/2017", "Operational": "13/02/2018", "Heat Network Ref": "", "lat": "51.093574", "long": "0.508258", "status": "operation", "mw": 40, "ext_id": "7129"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/10/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/10/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7129", "Record Last Updated (dd/mm/yyyy)": "23/10/2018", "Operator (or Applicant)": "Low Carbon", "Site Name": "Huggin's Hall", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Huggin's Hall, Glassenbury Road, Cranbrook, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "N17 2QE", "X-coordinate": "575739", "Y-coordinate": "135688", "Planning Authority": "Tunbridge Wells Borough Council", "Planning Application Reference": "16/06052/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "13/08/2017", "Operational": "13/02/2018", "Heat Network Ref": "", "lat": "51.093574", "long": "0.508258", "status": "operation", "mw": 40, "ext_id": "7129"}, "current_month": "2024-01", "dates": {"first_heard": "2018-10-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-21", "start_construction": "2017-08-13", "start_operation": "2018-02-13", "start_estimated": "", "month_disappeared": "", "go_live": "2018-02", "go_live_year_int": 2018, "name": "Huggin's Hall", "name_short": "Huggin's Hall", "owner": "Low Carbon", "state": "south east", "country": "uk", "lat": "51.093574", "long": "0.508258", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.093574+0.508258", "construction_time_month": 6, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Korea Zinc", "city": "ulsan", "id": "52", "external_id": "", "state": "", "country": "south korea", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "32", "customer": "Korea Zinc", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-07-27", "start_construction": "", "start_operation": "2018-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.430406", "long": "129.340086", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://pulsenews.co.kr/view.php?year=2017&no=505105", "link2": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "link3": "https://www.koreazinc.co.kr/english/company/page/headOffice.aspx", "link4": ""}, "internal_id": "52", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 32, "mwh_is_estimate": false, "mwh": 150, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-07-27", "start_construction": "", "start_operation": "2018-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-01", "go_live_year_int": 2018, "name": "Korea Zinc", "name_short": "Korea Zinc", "owner": "", "state": "", "country": "south korea", "lat": "35.430406", "long": "129.340086", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.430406+129.340086", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://pulsenews.co.kr/view.php?year=2017&no=505105", "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "https://www.koreazinc.co.kr/english/company/page/headOffice.aspx"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Leverton Farm - Energy Barn", "city": "", "id": "267", "external_id": "6917", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Eelpower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-11-01", "start_operation": "2018-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "267", "external_id": "6917", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Leverton Farm - Energy Barn", "external_id": "6917", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Eelpower", "status": "operation", "date_first_heard": "2018-12-11", "start_construction": "2017-11-01", "start_operation": "2018-01-01", "start_estimated": "", "month_disappeared": "", "lat": "53.259954", "long": "-0.56403", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6917", "Record Last Updated (dd/mm/yyyy)": "11/12/2018", "Operator (or Applicant)": "Eelpower", "Site Name": "Leverton Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Leverton Farm, Birch Holt Farm, Burton Lincoln, Lincoln\n", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "LN1 2RD", "X-coordinate": "495886", "Y-coordinate": "374623", "Planning Authority": "Lincolnshire County Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/11/2017", "Operational": "01/01/2018", "Heat Network Ref": "", "lat": "53.259954", "long": "-0.56403", "status": "operation", "mw": 10, "ext_id": "6917"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/12/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "11/12/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6917", "Record Last Updated (dd/mm/yyyy)": "11/12/2018", "Operator (or Applicant)": "Eelpower", "Site Name": "Leverton Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Leverton Farm, Birch Holt Farm, Burton Lincoln, Lincoln\n", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "LN1 2RD", "X-coordinate": "495886", "Y-coordinate": "374623", "Planning Authority": "Lincolnshire County Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/11/2017", "Operational": "01/01/2018", "Heat Network Ref": "", "lat": "53.259954", "long": "-0.56403", "status": "operation", "mw": 10, "ext_id": "6917"}, "current_month": "2024-01", "dates": {"first_heard": "2018-12-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-12-11", "start_construction": "2017-11-01", "start_operation": "2018-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2018-01", "go_live_year_int": 2018, "name": "Leverton Farm - Energy Barn", "name_short": "Leverton Farm - Energy Barn", "owner": "Eelpower", "state": "east midlands", "country": "uk", "lat": "53.259954", "long": "-0.56403", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.259954+-0.56403", "construction_time_month": 2, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cleator", "city": "", "id": "354", "external_id": "7177", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Low Carbon Storage Investment Company/ VLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-08-08", "start_operation": "2018-01-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "354", "external_id": "7177", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cleator", "external_id": "7177", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Low Carbon Storage Investment Company/ VLC", "status": "operation", "date_first_heard": "2019-01-03", "start_construction": "2017-08-08", "start_operation": "2018-01-08", "start_estimated": "", "month_disappeared": "", "lat": "54.503359", "long": "-3.529301", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7177", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Low Carbon Storage Investment Company/ VLC", "Site Name": "Cleator", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Cleator, Cumbria", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA22 2TA", "X-coordinate": "301067", "Y-coordinate": "513081", "Planning Authority": "Copeland Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "08/08/2017", "Operational": "08/01/2018", "Heat Network Ref": "", "lat": "54.503359", "long": "-3.529301", "status": "operation", "mw": 10, "ext_id": "7177"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7177", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Low Carbon Storage Investment Company/ VLC", "Site Name": "Cleator", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cleator, Cumbria", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA22 2TA", "X-coordinate": "301067", "Y-coordinate": "513081", "Planning Authority": "Copeland Borough Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "08/08/2017", "Operational": "08/01/2018", "Heat Network Ref": "", "lat": "54.503359", "long": "-3.529301", "status": "operation", "mw": 10, "ext_id": "7177"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-01-03", "start_construction": "2017-08-08", "start_operation": "2018-01-08", "start_estimated": "", "month_disappeared": "", "go_live": "2018-01", "go_live_year_int": 2018, "name": "Cleator", "name_short": "Cleator", "owner": "Low Carbon Storage Investment Company/ VLC", "state": "north west", "country": "uk", "lat": "54.503359", "long": "-3.529301", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.503359+-3.529301", "construction_time_month": 5, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hornsdale Power Reserve", "city": "hornsdale", "id": "8", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "194", "estimate_mwh": "", "power_mw": "150", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.085797", "long": "138.518339", "coords_hint": "1", "use_case": "316MW wind farm support", "notes": "42 power packs", "project_website": "https://hornsdalepowerreserve.com.au/", "link1": "https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve", "link2": "", "link3": "", "link4": ""}, "internal_id": "8", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 194, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-12", "go_live_year_int": 2017, "name": "Hornsdale Power Reserve", "name_short": "Hornsdale Power Reserve", "owner": "", "state": "south australia", "country": "australia", "lat": "-33.085797", "long": "138.518339", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.085797+138.518339", "construction_time_month": 4, "construction_speed_mwh_per_month": 48, "no_of_battery_units": 0, "notes_split": ["42 power packs"], "links": ["https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Lockleaze Energy Storage", "city": "", "id": "280", "external_id": "6961", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Aura Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-05-05", "start_construction": "2017-06-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "280", "external_id": "6961", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lockleaze Energy Storage", "external_id": "6961", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Aura Power", "status": "operation", "date_first_heard": "2017-05-05", "start_construction": "2017-06-01", "start_operation": "2017-12-01", "start_estimated": "", "month_disappeared": "", "lat": "51.484913", "long": "-2.571646", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6961", "Record Last Updated (dd/mm/yyyy)": "31/01/2019", "Operator (or Applicant)": "Aura Power", "Site Name": "Lockleaze Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Land at the SWEB Estate, Romney Avenue, Lockleaze, Bristol", "County": "Avon", "Region": "South West", "Country": "England", "Post Code": "BS7 9ST", "X-coordinate": "360403", "Y-coordinate": "176373", "Planning Authority": "Bristol City Council", "Planning Application Reference": "17/01147/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/05/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/06/2017", "Operational": "01/12/2017", "Heat Network Ref": "", "lat": "51.484913", "long": "-2.571646", "status": "operation", "mw": 15, "ext_id": "6961"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "31/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6961", "Record Last Updated (dd/mm/yyyy)": "31/01/2019", "Operator (or Applicant)": "Aura Power", "Site Name": "Lockleaze Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at the SWEB Estate, Romney Avenue, Lockleaze, Bristol", "County": "Avon", "Region": "South West", "Country": "England", "Post Code": "BS7 9ST", "X-coordinate": "360403", "Y-coordinate": "176373", "Planning Authority": "Bristol City Council", "Planning Application Reference": "17/01147/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/05/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/06/2017", "Operational": "01/12/2017", "Heat Network Ref": "", "lat": "51.484913", "long": "-2.571646", "status": "operation", "mw": 15, "ext_id": "6961"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-05-05", "start_construction": "2017-06-01", "start_operation": "2017-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-12", "go_live_year_int": 2017, "name": "Lockleaze Energy Storage", "name_short": "Lockleaze", "owner": "Aura Power", "state": "south west", "country": "uk", "lat": "51.484913", "long": "-2.571646", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.484913+-2.571646", "construction_time_month": 6, "construction_speed_mwh_per_month": 2, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackburn Meadows ", "city": "", "id": "261", "external_id": "6906", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "E.ON UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-04-07", "start_operation": "2017-10-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "261", "external_id": "6906", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackburn Meadows ", "external_id": "6906", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "E.ON UK", "status": "operation", "date_first_heard": "2019-03-21", "start_construction": "2017-04-07", "start_operation": "2017-10-09", "start_estimated": "", "month_disappeared": "", "lat": "53.420135", "long": "-1.39846", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6906", "Record Last Updated (dd/mm/yyyy)": "21/03/2019", "Operator (or Applicant)": "E.ON UK", "Site Name": "Blackburn Meadows ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "166", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Blackburn Meadows in Sheffield, South Yorkshire", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S9 1HF", "X-coordinate": "440075", "Y-coordinate": "391650", "Planning Authority": "Sheffield City Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "07/04/2017", "Operational": "09/10/2017", "Heat Network Ref": "", "lat": "53.420135", "long": "-1.39846", "status": "operation", "mw": 10, "ext_id": "6906"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/03/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "21/03/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6906", "Record Last Updated (dd/mm/yyyy)": "21/03/2019", "Operator (or Applicant)": "E.ON UK", "Site Name": "Blackburn Meadows ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "166", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackburn Meadows in Sheffield, South Yorkshire", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S9 1HF", "X-coordinate": "440075", "Y-coordinate": "391650", "Planning Authority": "Sheffield City Council", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "07/04/2017", "Operational": "09/10/2017", "Heat Network Ref": "", "lat": "53.420135", "long": "-1.39846", "status": "operation", "mw": 10, "ext_id": "6906"}, "current_month": "2024-01", "dates": {"first_heard": "2019-03-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-03-21", "start_construction": "2017-04-07", "start_operation": "2017-10-09", "start_estimated": "", "month_disappeared": "", "go_live": "2017-10", "go_live_year_int": 2017, "name": "Blackburn Meadows ", "name_short": "Blackburn Meadows ", "owner": "E.ON UK", "state": "yorkshire and humber", "country": "uk", "lat": "53.420135", "long": "-1.39846", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.420135+-1.39846", "construction_time_month": 6, "construction_speed_mwh_per_month": 1, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Q_ESS_Elverlingsen", "city": "", "id": "541", "external_id": "SEE966091400436", "state": "nrw", "country": "germany", "capacity_mwh": "18", "estimate_mwh": "", "power_mw": "17", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "541", "external_id": "SEE966091400436", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Q_ESS_Elverlingsen", "external_id": "SEE966091400436", "state": "nrw", "country": "germany", "mwh": 18, "estimate_mwh": "", "power_mw": 17, "owner": "Coulomb GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": "", "month_disappeared": "", "lat": "51.274860", "long": "7.704284", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2607339"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE966091400436", "DatumLetzteAktualisierung": "2021-02-15T12:47:02.2298795", "LokationMaStRNummer": "SEL990520260384", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2021-05-26", "AnlagenbetreiberMastrNummer": "ABR922907721966", "Land": "84", "Bundesland": "1409", "Landkreis": "M\u00e4rkischer Kreis", "Gemeinde": "Werdohl", "Gemeindeschluessel": "05962060", "Postleitzahl": "58791", "Strasse": "Auf der Mark", "StrasseNichtGefunden": "1", "Hausnummer": "1", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Werdohl", "Laengengrad": "7.704284", "Breitengrad": "51.274860", "Registrierungsdatum": "2019-12-17", "Inbetriebnahmedatum": "2017-07-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Q_ESS_Elverlingsen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "17080.000", "Nettonennleistung": "17080.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9903097000002", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "17080.000", "SpeMastrNummer": "SSE987360535918", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 18, "pr_url_id": "2607339", "ext_id": "SEE966091400436", "mw": 17, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-08", "li": [{"name": "NetzbetreiberpruefungStatus", "from": "0", "to": "1", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2021-05-26", "to": "2022-06-01", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE966091400436", "DatumLetzteAktualisierung": "2021-02-15T12:47:02.2298795", "LokationMaStRNummer": "SEL990520260384", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2022-06-01", "AnlagenbetreiberMastrNummer": "ABR922907721966", "Land": "84", "Bundesland": "1409", "Landkreis": "M\u00e4rkischer Kreis", "Gemeinde": "Werdohl", "Gemeindeschluessel": "05962060", "Postleitzahl": "58791", "Strasse": "Auf der Mark", "StrasseNichtGefunden": "1", "Hausnummer": "1", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "1", "Ort": "Werdohl", "Laengengrad": "7.704284", "Breitengrad": "51.274860", "Registrierungsdatum": "2019-12-17", "Inbetriebnahmedatum": "2017-07-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Q_ESS_Elverlingsen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "17080.000", "Nettonennleistung": "17080.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9903097000002", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "17080.000", "SpeMastrNummer": "SSE987360535918", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2607339", "owner": "Coulomb GmbH", "mwh": 18, "ext_id": "SEE966091400436", "mw": 17, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": ""}}, "mw": 17, "mwh_is_estimate": false, "mwh": 18, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-07", "go_live_year_int": 2017, "name": "Q_ESS_Elverlingsen", "name_short": "Q_ESS_Elverlingsen", "owner": "Coulomb GmbH", "state": "nrw", "country": "germany", "lat": "51.274860", "long": "7.704284", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.274860+7.704284", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2607339"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mira Loma Substation", "city": "Ontario", "id": "20", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "SCE Southern California Edison", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.00548", "long": "-117.566749", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity", "link2": "", "link3": "", "link4": ""}, "internal_id": "20", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "month_disappeared": "", "go_live": "2017-06", "go_live_year_int": 2017, "name": "Mira Loma Substation", "name_short": "Mira Loma Substation", "owner": "", "state": "california", "country": "usa", "lat": "34.00548", "long": "-117.566749", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.00548+-117.566749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hanover / Herrenhausen", "city": "Hanover", "id": "87", "external_id": "SEE953605889740", "state": "lower saxony", "country": "germany", "capacity_mwh": "17", "estimate_mwh": "", "power_mw": "", "customer": "enercity", "owner": "Mercedes Benz Energy", "developer": "", "manufacturer": "", "type": "ev battery", "cells": "", "no_of_battery_units": "3240", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.398301", "long": "9.681795", "coords_hint": "1", "use_case": "frequency balancing", "notes": "first and second life EV battery storage with smart car batteries", "project_website": "", "link1": "https://www.daimler.com/sustainability/resources/battery-storage-daimler-and-enercity.html", "link2": "https://www.electrive.net/2017/10/23/daimler-batterie-ersatzteillager-fuer-elektroautos-am-netz/", "link3": "https://www.youtube.com/watch?v=dDKVnp7_jrs", "link4": ""}, "internal_id": "87", "external_id": "SEE953605889740", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicher Herrenhausen", "external_id": "SEE953605889740", "state": "lower saxony", "country": "germany", "mwh": 17, "estimate_mwh": "", "power_mw": 14, "owner": "enercity AG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-28", "start_estimated": "", "month_disappeared": "", "lat": "52.398519", "long": "9.681854", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2568940"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE953605889740", "DatumLetzteAktualisierung": "2020-08-31T11:01:31.0300398", "LokationMaStRNummer": "SEL980392669743", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-01-22", "AnlagenbetreiberMastrNummer": "ABR901203303755", "Land": "84", "Bundesland": "1408", "Landkreis": "Region Hannover", "Gemeinde": "Hannover", "Gemeindeschluessel": "03241001", "Postleitzahl": "30419", "Strasse": "Leinh\u00e4user Weg", "StrasseNichtGefunden": "0", "Hausnummer": "5", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Hannover", "Laengengrad": "9.681854", "Breitengrad": "52.398519", "Registrierungsdatum": "2019-12-06", "Inbetriebnahmedatum": "2017-06-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Herrenhausen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "14000.000", "Nettonennleistung": "14000.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20412.000", "SpeMastrNummer": "SSE902773077886", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 17, "pr_url_id": "2568940", "ext_id": "SEE953605889740", "mw": 14, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE953605889740", "DatumLetzteAktualisierung": "2020-08-31T11:01:31.0300398", "LokationMaStRNummer": "SEL980392669743", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-01-22", "AnlagenbetreiberMastrNummer": "ABR901203303755", "Land": "84", "Bundesland": "1408", "Landkreis": "Region Hannover", "Gemeinde": "Hannover", "Gemeindeschluessel": "03241001", "Postleitzahl": "30419", "Strasse": "Leinh\u00e4user Weg", "StrasseNichtGefunden": "0", "Hausnummer": "5", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Hannover", "Laengengrad": "9.681854", "Breitengrad": "52.398519", "Registrierungsdatum": "2019-12-06", "Inbetriebnahmedatum": "2017-06-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Herrenhausen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "14000.000", "Nettonennleistung": "14000.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "20412.000", "SpeMastrNummer": "SSE902773077886", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2568940", "owner": "enercity AG", "mwh": 17, "ext_id": "SEE953605889740", "mw": 14, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2017-06-28", "start_estimated": ""}}, "mw": 14, "mwh_is_estimate": false, "mwh": 17, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-28", "start_estimated": "", "month_disappeared": "", "go_live": "2017-06", "go_live_year_int": 2017, "name": "Batteriespeicher Herrenhausen", "name_short": "Batteriespeicher Herrenhausen", "owner": "enercity AG", "state": "lower saxony", "country": "germany", "lat": "52.398519", "long": "9.681854", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.398519+9.681854", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 3240, "notes_split": ["first and second life EV battery storage with smart car batteries"], "links": ["https://www.daimler.com/sustainability/resources/battery-storage-daimler-and-enercity.html", "https://www.electrive.net/2017/10/23/daimler-batterie-ersatzteillager-fuer-elektroautos-am-netz/", "https://www.youtube.com/watch?v=dDKVnp7_jrs", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2568940"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pelham", "city": "", "id": "260", "external_id": "6898", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy/ InfraRed Capital", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-18", "start_construction": "2017-01-15", "start_operation": "2017-06-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "260", "external_id": "6898", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pelham", "external_id": "6898", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy/ InfraRed Capital", "status": "operation", "date_first_heard": "2016-10-18", "start_construction": "2017-01-15", "start_operation": "2017-06-15", "start_estimated": "", "month_disappeared": "", "lat": "51.937437", "long": "0.119184", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6898", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Statera Energy/ InfraRed Capital", "Site Name": "Pelham", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "LAND NORTH OF PELHAM SUBSATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP\ufffdS STORTFORD, ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM23 1BA", "X-coordinate": "545779", "Y-coordinate": "228669", "Planning Authority": "Uttlesford District Council", "Planning Application Reference": "UTT/16/2316/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/10/2019", "Under Construction": "15/01/2017", "Operational": "15/06/2017", "Heat Network Ref": "", "lat": "51.937437", "long": "0.119184", "status": "operation", "mw": 49, "ext_id": "6898"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/01/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/01/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6898", "Record Last Updated (dd/mm/yyyy)": "03/01/2019", "Operator (or Applicant)": "Statera Energy/ InfraRed Capital", "Site Name": "Pelham", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "LAND NORTH OF PELHAM SUBSATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP\ufffdS STORTFORD, ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM23 1BA", "X-coordinate": "545779", "Y-coordinate": "228669", "Planning Authority": "Uttlesford District Council", "Planning Application Reference": "UTT/16/2316/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/10/2019", "Under Construction": "15/01/2017", "Operational": "15/06/2017", "Heat Network Ref": "", "lat": "51.937437", "long": "0.119184", "status": "operation", "mw": 49, "ext_id": "6898"}, "current_month": "2024-01", "dates": {"first_heard": "2019-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-18", "start_construction": "2017-01-15", "start_operation": "2017-06-15", "start_estimated": "", "month_disappeared": "", "go_live": "2017-06", "go_live_year_int": 2017, "name": "Pelham", "name_short": "Pelham", "owner": "Statera Energy/ InfraRed Capital", "state": "eastern", "country": "uk", "lat": "51.937437", "long": "0.119184", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.937437+0.119184", "construction_time_month": 5, "construction_speed_mwh_per_month": 9, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "city": "", "id": "528", "external_id": "SEE910324388312", "state": "saxony", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "528", "external_id": "SEE910324388312", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "external_id": "SEE910324388312", "state": "saxony", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": "", "month_disappeared": "", "lat": "50.856837", "long": "12.917631", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4139056"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE910324388312", "DatumLetzteAktualisierung": "2021-01-20T06:33:13.7986188", "LokationMaStRNummer": "SEL973164328665", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-08-19", "AnlagenbetreiberMastrNummer": "ABR992411297332", "Land": "84", "Bundesland": "1413", "Landkreis": "Chemnitz", "Gemeinde": "Chemnitz", "Gemeindeschluessel": "14511000", "Postleitzahl": "09114", "Strasse": "Dammweg", "StrasseNichtGefunden": "0", "Hausnummer": "15", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Chemnitz", "Laengengrad": "12.917631", "Breitengrad": "50.856837", "Registrierungsdatum": "2021-01-20", "Inbetriebnahmedatum": "2017-04-24", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15800.000", "Nettonennleistung": "15800.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9905290000003", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16400.000", "SpeMastrNummer": "SSE985950438502", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "4139056", "ext_id": "SEE910324388312", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE910324388312", "DatumLetzteAktualisierung": "2021-01-20T06:33:13.7986188", "LokationMaStRNummer": "SEL973164328665", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-08-19", "AnlagenbetreiberMastrNummer": "ABR992411297332", "Land": "84", "Bundesland": "1413", "Landkreis": "Chemnitz", "Gemeinde": "Chemnitz", "Gemeindeschluessel": "14511000", "Postleitzahl": "09114", "Strasse": "Dammweg", "StrasseNichtGefunden": "0", "Hausnummer": "15", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Chemnitz", "Laengengrad": "12.917631", "Breitengrad": "50.856837", "Registrierungsdatum": "2021-01-20", "Inbetriebnahmedatum": "2017-04-24", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15800.000", "Nettonennleistung": "15800.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9905290000003", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "16400.000", "SpeMastrNummer": "SSE985950438502", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4139056", "owner": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "mwh": 15, "ext_id": "SEE910324388312", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": "", "month_disappeared": "", "go_live": "2017-04", "go_live_year_int": 2017, "name": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "name_short": "Batteriespeicher Chemnitz GmbH \uff06 Co...", "owner": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "state": "saxony", "country": "germany", "lat": "50.856837", "long": "12.917631", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.856837+12.917631", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4139056"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kauai Island", "city": "Kauai", "id": "19", "external_id": "", "state": "hawaii", "country": "usa", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "", "customer": "KIUC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.998353", "long": "-159.378905", "coords_hint": "1", "use_case": "island, 13mw solar farm support", "notes": "20 year contract to buy energy", "project_website": "", "link1": "https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "link2": "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "link3": "https://en.wikipedia.org/wiki/Kauai", "link4": ""}, "internal_id": "19", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Kauai Island", "name_short": "Kauai Island", "owner": "", "state": "hawaii", "country": "usa", "lat": "21.998353", "long": "-159.378905", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:21.998353+-159.378905", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": ["20 year contract to buy energy"], "links": ["https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "https://en.wikipedia.org/wiki/Kauai"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hill Farm - Energy Barn", "city": "", "id": "265", "external_id": "6915", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-08-17", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "265", "external_id": "6915", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hill Farm - Energy Barn", "external_id": "6915", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Anesco/ Green Hedge Energy UK", "status": "operation", "date_first_heard": "2016-08-17", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "month_disappeared": "", "lat": "52.727871", "long": "-1.458906", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6915", "Record Last Updated (dd/mm/yyyy)": "15/03/2019", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Hill Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Hill Farm, Spring Lane, Packington, Ashby de la Zouch, Leicestershire\n", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE65 1WU", "X-coordinate": "436639", "Y-coordinate": "314607", "Planning Authority": "North West Leicestershire District Council", "Planning Application Reference": "16/00735/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/08/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "31/03/2017", "Heat Network Ref": "", "lat": "52.727871", "long": "-1.458906", "status": "operation", "mw": 10, "ext_id": "6915"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/03/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "15/03/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6915", "Record Last Updated (dd/mm/yyyy)": "15/03/2019", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Hill Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hill Farm, Spring Lane, Packington, Ashby de la Zouch, Leicestershire\n", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE65 1WU", "X-coordinate": "436639", "Y-coordinate": "314607", "Planning Authority": "North West Leicestershire District Council", "Planning Application Reference": "16/00735/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/08/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "31/03/2017", "Heat Network Ref": "", "lat": "52.727871", "long": "-1.458906", "status": "operation", "mw": 10, "ext_id": "6915"}, "current_month": "2024-01", "dates": {"first_heard": "2019-03-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-08-17", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Hill Farm - Energy Barn", "name_short": "Hill Farm - Energy Barn", "owner": "Anesco/ Green Hedge Energy UK", "state": "east midlands", "country": "uk", "lat": "52.727871", "long": "-1.458906", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.727871+-1.458906", "construction_time_month": 3, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kings Barn Farm - Energy Barn", "city": "", "id": "266", "external_id": "6916", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-04", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "266", "external_id": "6916", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kings Barn Farm - Energy Barn", "external_id": "6916", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Anesco/ Green Hedge Energy UK", "status": "operation", "date_first_heard": "2016-10-04", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "month_disappeared": "", "lat": "50.889769", "long": "-0.317163", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6916", "Record Last Updated (dd/mm/yyyy)": "15/03/2019", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Kings Barn Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Kings Barn Farm, Steyning, West Sussex", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "BN44 3YR", "X-coordinate": "518460", "Y-coordinate": "111380", "Planning Authority": "Horsham District Council", "Planning Application Reference": "DC/16/1648", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "31/03/2017", "Heat Network Ref": "", "lat": "50.889769", "long": "-0.317163", "status": "operation", "mw": 10, "ext_id": "6916"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/03/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "15/03/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6916", "Record Last Updated (dd/mm/yyyy)": "15/03/2019", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Kings Barn Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kings Barn Farm, Steyning, West Sussex", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "BN44 3YR", "X-coordinate": "518460", "Y-coordinate": "111380", "Planning Authority": "Horsham District Council", "Planning Application Reference": "DC/16/1648", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "31/03/2017", "Heat Network Ref": "", "lat": "50.889769", "long": "-0.317163", "status": "operation", "mw": 10, "ext_id": "6916"}, "current_month": "2024-01", "dates": {"first_heard": "2019-03-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-10-04", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Kings Barn Farm - Energy Barn", "name_short": "Kings Barn Farm - Energy Barn", "owner": "Anesco/ Green Hedge Energy UK", "state": "south east", "country": "uk", "lat": "50.889769", "long": "-0.317163", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.889769+-0.317163", "construction_time_month": 3, "construction_speed_mwh_per_month": 3, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Noriker Power Staunch", "city": "", "id": "268", "external_id": "6918", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Hazel Capital/ Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-05-19", "start_construction": "2016-12-15", "start_operation": "2017-03-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "268", "external_id": "6918", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Noriker Power Staunch", "external_id": "6918", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Hazel Capital/ Noriker Power", "status": "operation", "date_first_heard": "2016-05-19", "start_construction": "2016-12-15", "start_operation": "2017-03-15", "start_estimated": "", "month_disappeared": "", "lat": "53.032893", "long": "-2.243304", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6918", "Record Last Updated (dd/mm/yyyy)": "09/05/2019", "Operator (or Applicant)": "Hazel Capital/ Noriker Power", "Site Name": "Noriker Power Staunch", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Holditch House, Holditch Road, Chesterton", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST5 9JQ", "X-coordinate": "383781", "Y-coordinate": "348429", "Planning Authority": "Newcastle Under Lyme Borough Council", "Planning Application Reference": "16/00242/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/05/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "15/03/2017", "Heat Network Ref": "", "lat": "53.032893", "long": "-2.243304", "status": "operation", "mw": 20, "ext_id": "6918"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/05/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/05/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6918", "Record Last Updated (dd/mm/yyyy)": "09/05/2019", "Operator (or Applicant)": "Hazel Capital/ Noriker Power", "Site Name": "Noriker Power Staunch", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holditch House, Holditch Road, Chesterton", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST5 9JQ", "X-coordinate": "383781", "Y-coordinate": "348429", "Planning Authority": "Newcastle Under Lyme Borough Council", "Planning Application Reference": "16/00242/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/05/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/12/2016", "Operational": "15/03/2017", "Heat Network Ref": "", "lat": "53.032893", "long": "-2.243304", "status": "operation", "mw": 20, "ext_id": "6918"}, "current_month": "2024-01", "dates": {"first_heard": "2019-05-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2016-05-19", "start_construction": "2016-12-15", "start_operation": "2017-03-15", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Noriker Power Staunch", "name_short": "Noriker Power Staunch", "owner": "Hazel Capital/ Noriker Power", "state": "west midlands", "country": "uk", "lat": "53.032893", "long": "-2.243304", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.032893+-2.243304", "construction_time_month": 3, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trents Energy Storage", "city": "St. Lucy", "id": "36", "external_id": "", "state": "", "country": "barbados", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "5", "customer": "Barbados Light & Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "13.293125", "long": "-59.627449", "coords_hint": "1", "use_case": "island, solar farm support", "notes": "", "project_website": "", "link1": "https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "link2": "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/", "link3": "", "link4": ""}, "internal_id": "36", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 5, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-01", "go_live_year_int": 2017, "name": "Trents Energy Storage", "name_short": "Trents", "owner": "", "state": "", "country": "barbados", "lat": "13.293125", "long": "-59.627449", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:13.293125+-59.627449", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Luenen", "city": "Luenen", "id": "86", "external_id": "SEE905490507995", "state": "nrw", "country": "germany", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Mercedes Benz Energy / The Mobility House", "developer": "", "manufacturer": "", "type": "ev battery", "cells": "", "no_of_battery_units": "1000", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.619937", "long": "7.471047", "coords_hint": "1", "use_case": "frequency balancing", "notes": "second life EV battery storage with smart fortwo batteries", "project_website": "", "link1": "https://www.mobilityhouse.com/int_en/magazine/press-releases/worlds-largest-2nd-use-battery-storage-is-starting-up.html/", "link2": "https://www.youtube.com/watch?v=dDKVnp7_jrs", "link3": "", "link4": ""}, "internal_id": "86", "external_id": "SEE905490507995", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Q_ESS_Luenen", "external_id": "SEE905490507995", "state": "nrw", "country": "germany", "mwh": 9, "estimate_mwh": "", "power_mw": 11, "owner": "Coulomb GmbH", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-12-01", "start_estimated": "", "month_disappeared": "", "lat": "51.616620", "long": "7.466350", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2607685"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE905490507995", "DatumLetzteAktualisierung": "2020-10-06T08:41:27.5953111", "LokationMaStRNummer": "SEL947145760096", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-06", "AnlagenbetreiberMastrNummer": "ABR922907721966", "Land": "84", "Bundesland": "1409", "Landkreis": "Unna", "Gemeinde": "L\u00fcnen", "Gemeindeschluessel": "05978024", "Postleitzahl": "44536", "Strasse": "Brunnenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "138", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "L\u00fcnen", "Laengengrad": "7.466350", "Breitengrad": "51.616620", "Registrierungsdatum": "2019-12-17", "Inbetriebnahmedatum": "2016-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Q_ESS_Luenen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "11920.000", "Nettonennleistung": "11920.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9903097000002", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11920.000", "SpeMastrNummer": "SSE912044016452", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 9, "pr_url_id": "2607685", "ext_id": "SEE905490507995", "mw": 11, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE905490507995", "DatumLetzteAktualisierung": "2020-10-06T08:41:27.5953111", "LokationMaStRNummer": "SEL947145760096", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-06", "AnlagenbetreiberMastrNummer": "ABR922907721966", "Land": "84", "Bundesland": "1409", "Landkreis": "Unna", "Gemeinde": "L\u00fcnen", "Gemeindeschluessel": "05978024", "Postleitzahl": "44536", "Strasse": "Brunnenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "138", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "L\u00fcnen", "Laengengrad": "7.466350", "Breitengrad": "51.616620", "Registrierungsdatum": "2019-12-17", "Inbetriebnahmedatum": "2016-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Q_ESS_Luenen", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "11920.000", "Nettonennleistung": "11920.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9903097000002", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "694", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11920.000", "SpeMastrNummer": "SSE912044016452", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2607685", "owner": "Coulomb GmbH", "mwh": 9, "ext_id": "SEE905490507995", "mw": 11, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-12-01", "start_estimated": ""}}, "mw": 11, "mwh_is_estimate": false, "mwh": 9, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2016-12", "go_live_year_int": 2016, "name": "Q_ESS_Luenen", "name_short": "Q_ESS_Luenen", "owner": "Coulomb GmbH", "state": "nrw", "country": "germany", "lat": "51.616620", "long": "7.466350", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.616620+7.466350", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 1000, "notes_split": ["second life EV battery storage with smart fortwo batteries"], "links": ["https://www.mobilityhouse.com/int_en/magazine/press-releases/worlds-largest-2nd-use-battery-storage-is-starting-up.html/", "https://www.youtube.com/watch?v=dDKVnp7_jrs", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2607685"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ta'u island", "city": "Ta'u island", "id": "29", "external_id": "", "state": "american samoa", "country": "usa", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-14.219534", "long": "-169.494626", "coords_hint": "1", "use_case": "island, 1.4MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/", "link2": "", "link3": "", "link4": ""}, "internal_id": "29", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 6, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "month_disappeared": "", "go_live": "2016-11", "go_live_year_int": 2016, "name": "Ta'u island", "name_short": "Ta'u island", "owner": "", "state": "american samoa", "country": "usa", "lat": "-14.219534", "long": "-169.494626", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-14.219534+-169.494626", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "GBS KW Fenne", "city": "", "id": "530", "external_id": "SEE919443669678", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "530", "external_id": "SEE919443669678", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Fenne", "external_id": "SEE919443669678", "state": "saarland", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": "", "month_disappeared": "", "lat": "49.247195", "long": "6.878758", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3429839"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE919443669678", "DatumLetzteAktualisierung": "2020-09-16T11:13:40.5301939", "LokationMaStRNummer": "SEL949403128662", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-11-03", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Regionalverband Saarbr\u00fccken", "Gemeinde": "V\u00f6lklingen", "Gemeindeschluessel": "10041519", "Postleitzahl": "66333", "Strasse": "Saarbr\u00fccker Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "135", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "V\u00f6lklingen", "Laengengrad": "6.878758", "Breitengrad": "49.247195", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-10-09", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Fenne", "Weic_nv": "1", "Kraftwerksnummer": "BNA1814", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE987642146320", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE944760568557", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3429839", "ext_id": "SEE919443669678", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE919443669678", "DatumLetzteAktualisierung": "2020-09-16T11:13:40.5301939", "LokationMaStRNummer": "SEL949403128662", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-11-03", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Regionalverband Saarbr\u00fccken", "Gemeinde": "V\u00f6lklingen", "Gemeindeschluessel": "10041519", "Postleitzahl": "66333", "Strasse": "Saarbr\u00fccker Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "135", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "V\u00f6lklingen", "Laengengrad": "6.878758", "Breitengrad": "49.247195", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-10-09", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Fenne", "Weic_nv": "1", "Kraftwerksnummer": "BNA1814", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE987642146320", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE944760568557", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3429839", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE919443669678", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": "", "month_disappeared": "", "go_live": "2016-10", "go_live_year_int": 2016, "name": "GBS KW Fenne", "name_short": "GBS KW Fenne", "owner": "STEAG Battery System", "state": "saarland", "country": "germany", "lat": "49.247195", "long": "6.878758", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.247195+6.878758", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3429839"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS KW Walsum", "city": "", "id": "540", "external_id": "SEE964940893804", "state": "nrw", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "540", "external_id": "SEE964940893804", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Walsum", "external_id": "SEE964940893804", "state": "nrw", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": "", "month_disappeared": "", "lat": "51.527123", "long": "6.711709", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430514"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE964940893804", "DatumLetzteAktualisierung": "2020-09-16T10:52:57.7837543", "LokationMaStRNummer": "SEL914074075270", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-09", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1409", "Landkreis": "Duisburg", "Gemeinde": "Duisburg", "Gemeindeschluessel": "05112000", "Postleitzahl": "47179", "Strasse": "Dr.-Wilhelm-Roelen-Str.", "StrasseNichtGefunden": "0", "Hausnummer": "129", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Duisburg", "Laengengrad": "6.711709", "Breitengrad": "51.527123", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-09-30", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Walsum", "Weic_nv": "1", "Kraftwerksnummer": "BNA1815", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE967676113161", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE958726175123", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3430514", "ext_id": "SEE964940893804", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE964940893804", "DatumLetzteAktualisierung": "2020-09-16T10:52:57.7837543", "LokationMaStRNummer": "SEL914074075270", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-09", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1409", "Landkreis": "Duisburg", "Gemeinde": "Duisburg", "Gemeindeschluessel": "05112000", "Postleitzahl": "47179", "Strasse": "Dr.-Wilhelm-Roelen-Str.", "StrasseNichtGefunden": "0", "Hausnummer": "129", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Duisburg", "Laengengrad": "6.711709", "Breitengrad": "51.527123", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-09-30", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Walsum", "Weic_nv": "1", "Kraftwerksnummer": "BNA1815", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE967676113161", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE958726175123", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3430514", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE964940893804", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": "", "month_disappeared": "", "go_live": "2016-09", "go_live_year_int": 2016, "name": "GBS KW Walsum", "name_short": "GBS KW Walsum", "owner": "STEAG Battery System", "state": "nrw", "country": "germany", "lat": "51.527123", "long": "6.711709", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.527123+6.711709", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430514"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS KW Bexbach", "city": "", "id": "547", "external_id": "SEE990521990150", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "547", "external_id": "SEE990521990150", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Bexbach", "external_id": "SEE990521990150", "state": "saarland", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": "", "month_disappeared": "", "lat": "49.363960", "long": "7.239233", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430313"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE990521990150", "DatumLetzteAktualisierung": "2020-09-16T11:17:21.3046929", "LokationMaStRNummer": "SEL991630637981", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-08", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Saarpfalz-Kreis", "Gemeinde": "Bexbach", "Gemeindeschluessel": "10045111", "Postleitzahl": "66450", "Strasse": "Grubenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Bexbach", "Laengengrad": "7.239233", "Breitengrad": "49.363960", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-09-25", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Bexbach", "Weic_nv": "1", "Kraftwerksnummer": "BNA1816", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE950751939329", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE932353107191", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3430313", "ext_id": "SEE990521990150", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE990521990150", "DatumLetzteAktualisierung": "2020-09-16T11:17:21.3046929", "LokationMaStRNummer": "SEL991630637981", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-08", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Saarpfalz-Kreis", "Gemeinde": "Bexbach", "Gemeindeschluessel": "10045111", "Postleitzahl": "66450", "Strasse": "Grubenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Bexbach", "Laengengrad": "7.239233", "Breitengrad": "49.363960", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-09-25", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Bexbach", "Weic_nv": "1", "Kraftwerksnummer": "BNA1816", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE950751939329", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE932353107191", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3430313", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE990521990150", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": "", "month_disappeared": "", "go_live": "2016-09", "go_live_year_int": 2016, "name": "GBS KW Bexbach", "name_short": "GBS KW Bexbach", "owner": "STEAG Battery System", "state": "saarland", "country": "germany", "lat": "49.363960", "long": "7.239233", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.363960+7.239233", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430313"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS 2 KW Bexbach", "city": "", "id": "527", "external_id": "SEE908096553144", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "527", "external_id": "SEE908096553144", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS 2 KW Bexbach", "external_id": "SEE908096553144", "state": "saarland", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": "", "month_disappeared": "", "lat": "49.363746", "long": "7.239967", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430593"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE908096553144", "DatumLetzteAktualisierung": "2021-01-29T06:06:12.4560336", "LokationMaStRNummer": "SEL933883666554", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-02", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Saarpfalz-Kreis", "Gemeinde": "Bexbach", "Gemeindeschluessel": "10045111", "Postleitzahl": "66450", "Strasse": "Grubenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Bexbach", "Laengengrad": "7.239967", "Breitengrad": "49.363746", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS 2 KW Bexbach", "Weic_nv": "0", "Kraftwerksnummer": "BNA1811", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE931076336376", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE915355479251", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3430593", "ext_id": "SEE908096553144", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE908096553144", "DatumLetzteAktualisierung": "2021-01-29T06:06:12.4560336", "LokationMaStRNummer": "SEL933883666554", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2021-02-02", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Saarpfalz-Kreis", "Gemeinde": "Bexbach", "Gemeindeschluessel": "10045111", "Postleitzahl": "66450", "Strasse": "Grubenstra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Bexbach", "Laengengrad": "7.239967", "Breitengrad": "49.363746", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-08", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS 2 KW Bexbach", "Weic_nv": "0", "Kraftwerksnummer": "BNA1811", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE931076336376", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE915355479251", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3430593", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE908096553144", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": "", "month_disappeared": "", "go_live": "2016-08", "go_live_year_int": 2016, "name": "GBS 2 KW Bexbach", "name_short": "GBS 2 KW Bexbach", "owner": "STEAG Battery System", "state": "saarland", "country": "germany", "lat": "49.363746", "long": "7.239967", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.363746+7.239967", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430593"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS KW Weiher", "city": "", "id": "536", "external_id": "SEE941708872783", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "536", "external_id": "SEE941708872783", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Weiher", "external_id": "SEE941708872783", "state": "saarland", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "month_disappeared": "", "lat": "49.334731", "long": "7.031127", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3395953"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE941708872783", "DatumLetzteAktualisierung": "2020-09-16T11:09:57.6813215", "LokationMaStRNummer": "SEL969113527968", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-11-03", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Regionalverband Saarbr\u00fccken", "Gemeinde": "Quierschied", "Gemeindeschluessel": "10041516", "Postleitzahl": "66287", "Strasse": "Holzer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Quierschied", "Laengengrad": "7.031127", "Breitengrad": "49.334731", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Weiher", "Weic_nv": "1", "Kraftwerksnummer": "BNA1812", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE951864355471", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE920756375613", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3395953", "ext_id": "SEE941708872783", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE941708872783", "DatumLetzteAktualisierung": "2020-09-16T11:09:57.6813215", "LokationMaStRNummer": "SEL969113527968", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-11-03", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1412", "Landkreis": "Regionalverband Saarbr\u00fccken", "Gemeinde": "Quierschied", "Gemeindeschluessel": "10041516", "Postleitzahl": "66287", "Strasse": "Holzer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "0", "Ort": "Quierschied", "Laengengrad": "7.031127", "Breitengrad": "49.334731", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Weiher", "Weic_nv": "1", "Kraftwerksnummer": "BNA1812", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "0", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE951864355471", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE920756375613", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3395953", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE941708872783", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "month_disappeared": "", "go_live": "2016-08", "go_live_year_int": 2016, "name": "GBS KW Weiher", "name_short": "GBS KW Weiher", "owner": "STEAG Battery System", "state": "saarland", "country": "germany", "lat": "49.334731", "long": "7.031127", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.334731+7.031127", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3395953"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GBS KW Herne", "city": "", "id": "542", "external_id": "SEE971138728251", "state": "nrw", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "542", "external_id": "SEE971138728251", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "GBS KW Herne", "external_id": "SEE971138728251", "state": "nrw", "country": "germany", "mwh": 15, "estimate_mwh": "", "power_mw": 15, "owner": "STEAG Battery System", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "month_disappeared": "", "lat": "51.552413", "long": "7.189822", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430427"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE971138728251", "DatumLetzteAktualisierung": "2020-09-16T10:29:13.5745897", "LokationMaStRNummer": "SEL921790334635", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-06", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1409", "Landkreis": "Herne", "Gemeinde": "Herne", "Gemeindeschluessel": "05916000", "Postleitzahl": "44653", "Strasse": "Hertener Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "16", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Herne", "Laengengrad": "7.189822", "Breitengrad": "51.552413", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Herne", "Weic_nv": "1", "Kraftwerksnummer": "BNA1813", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE937682233207", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE956487017720", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 15, "pr_url_id": "3430427", "ext_id": "SEE971138728251", "mw": 15, "status": "operation"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE971138728251", "DatumLetzteAktualisierung": "2020-09-16T10:29:13.5745897", "LokationMaStRNummer": "SEL921790334635", "NetzbetreiberpruefungStatus": "1", "NetzbetreiberpruefungDatum": "2020-10-06", "AnlagenbetreiberMastrNummer": "ABR998735752212", "Land": "84", "Bundesland": "1409", "Landkreis": "Herne", "Gemeinde": "Herne", "Gemeindeschluessel": "05916000", "Postleitzahl": "44653", "Strasse": "Hertener Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "16", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Herne", "Laengengrad": "7.189822", "Breitengrad": "51.552413", "Registrierungsdatum": "2020-09-16", "Inbetriebnahmedatum": "2016-08-28", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "GBS KW Herne", "Weic_nv": "1", "Kraftwerksnummer": "BNA1813", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "15000.000", "Nettonennleistung": "15000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911809000003", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "GenMastrNummer": "SGE937682233207", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE956487017720", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3430427", "owner": "STEAG Battery System", "mwh": 15, "ext_id": "SEE971138728251", "mw": 15, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": ""}}, "mw": 15, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "month_disappeared": "", "go_live": "2016-08", "go_live_year_int": 2016, "name": "GBS KW Herne", "name_short": "GBS KW Herne", "owner": "STEAG Battery System", "state": "nrw", "country": "germany", "lat": "51.552413", "long": "7.189822", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.552413+7.189822", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3430427"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "RRKW Feldheim", "city": "", "id": "545", "external_id": "SEE976927444749", "state": "brandenburg", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "545", "external_id": "SEE976927444749", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "RRKW Feldheim", "external_id": "SEE976927444749", "state": "brandenburg", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "RRKW Feldheim GmbH \uff06 Co. KG", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": "", "month_disappeared": "", "lat": "52.009849", "long": "12.822563", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2667151"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE976927444749", "DatumLetzteAktualisierung": "2020-01-08T14:16:54.1030683", "LokationMaStRNummer": "SEL934579389085", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2021-10-28", "AnlagenbetreiberMastrNummer": "ABR996025035908", "Land": "84", "Bundesland": "1400", "Landkreis": "Potsdam-Mittelmark", "Gemeinde": "Treuenbrietzen", "Gemeindeschluessel": "12069632", "Postleitzahl": "14929", "Strasse": "Hinter den G\u00e4rten", "StrasseNichtGefunden": "0", "Hausnummer": "15 b", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Treuenbrietzen", "Laengengrad": "12.822563", "Breitengrad": "52.009849", "Registrierungsdatum": "2020-01-08", "Inbetriebnahmedatum": "2016-07-26", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "RRKW Feldheim", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "1234567891234", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "BestandteilGrenzkraftwerk": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE948227511988", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 10, "pr_url_id": "2667151", "ext_id": "SEE976927444749", "mw": 10, "status": "operation"}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "NetzbetreiberpruefungDatum", "from": "2021-10-28", "to": "2022-03-03", "extra": "", "change_type": "misc"}]}, {"month": "2022-08", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-01-08T14:16:54.1030683", "to": "2022-05-04T10:40:15.0620181", "extra": "", "change_type": "misc"}, {"name": "NetzbetreiberpruefungDatum", "from": "2022-03-03", "to": "2022-07-07", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE976927444749", "DatumLetzteAktualisierung": "2022-05-04T10:40:15.0620181", "LokationMaStRNummer": "SEL934579389085", "NetzbetreiberpruefungStatus": "0", "NetzbetreiberpruefungDatum": "2022-07-07", "AnlagenbetreiberMastrNummer": "ABR996025035908", "Land": "84", "Bundesland": "1400", "Landkreis": "Potsdam-Mittelmark", "Gemeinde": "Treuenbrietzen", "Gemeindeschluessel": "12069632", "Postleitzahl": "14929", "Strasse": "Hinter den G\u00e4rten", "StrasseNichtGefunden": "0", "Hausnummer": "15 b", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Treuenbrietzen", "Laengengrad": "12.822563", "Breitengrad": "52.009849", "Registrierungsdatum": "2020-01-08", "Inbetriebnahmedatum": "2016-07-26", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "35", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "RRKW Feldheim", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "1234567891234", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "10000.000", "SpeMastrNummer": "SSE948227511988", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "2667151", "owner": "RRKW Feldheim GmbH \uff06 Co. KG", "mwh": 10, "ext_id": "SEE976927444749", "mw": 10, "status": "operation"}, "current_month": "2022-12", "dates": {"first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": "", "month_disappeared": "", "go_live": "2016-07", "go_live_year_int": 2016, "name": "RRKW Feldheim", "name_short": "RRKW Feldheim", "owner": "RRKW Feldheim GmbH \uff06 Co. KG", "state": "brandenburg", "country": "germany", "lat": "52.009849", "long": "12.822563", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.009849+12.822563", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/2667151"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scampitella", "city": "", "id": "131", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "72", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / fluence", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.082553", "long": "15.342974", "coords_hint": "1", "use_case": "", "notes": "fluence claims it is from them, but in the nidec pdf the also mention it, not quite sure...", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://blog.fluenceenergy.com/enel-x-taps-fluence-gridstack-storage-product-to-deliver-fast-reserve-services-in-italy", "link3": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link4": ""}, "internal_id": "131", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 72, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2016-01", "go_live_year_int": 2016, "name": "Scampitella", "name_short": "Scampitella", "owner": "Terna", "state": "", "country": "italy", "lat": "41.082553", "long": "15.342974", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.082553+15.342974", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["fluence claims it is from them, but in the nidec pdf the also mention it, not quite sure..."], "links": ["https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "https://blog.fluenceenergy.com/enel-x-taps-fluence-gridstack-storage-product-to-deliver-fast-reserve-services-in-italy", "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ginestra", "city": "", "id": "132", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / nidec", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.285189", "long": "15.072551", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link3": "https://www.ngk-insulators.com/en/product/nas-solutions.html", "link4": ""}, "internal_id": "132", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2016-01", "go_live_year_int": 2016, "name": "Ginestra", "name_short": "Ginestra", "owner": "Terna", "state": "", "country": "italy", "lat": "41.285189", "long": "15.072551", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.285189+15.072551", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "https://www.ngk-insulators.com/en/product/nas-solutions.html"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Flumeri", "city": "", "id": "133", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / nidec", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.067966", "long": "15.123332", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link3": "", "link4": ""}, "internal_id": "133", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2016-01", "go_live_year_int": 2016, "name": "Flumeri", "name_short": "Flumeri", "owner": "Terna", "state": "", "country": "italy", "lat": "41.067966", "long": "15.123332", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.067966+15.123332", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES Kilroot Station Battery Storage Array", "city": "", "id": "259", "external_id": "6845", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "AES Kilroot Power (AES KPL)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2015-11-18", "start_operation": "2016-01-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "259", "external_id": "6845", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "AES Kilroot Station Battery Storage Array", "external_id": "6845", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "AES Kilroot Power (AES KPL)", "status": "operation", "date_first_heard": "2018-12-12", "start_construction": "2015-11-18", "start_operation": "2016-01-18", "start_estimated": "", "month_disappeared": "", "lat": "54.724406", "long": "-5.767212", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6845", "Record Last Updated (dd/mm/yyyy)": "12/12/2018", "Operator (or Applicant)": "AES Kilroot Power (AES KPL)", "Site Name": "AES Kilroot Station Battery Storage Array", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Address": "Carrickfergus", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT38 7LX", "X-coordinate": "157517", "Y-coordinate": "543117", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "18/11/2015", "Operational": "18/01/2016", "Heat Network Ref": "", "lat": "54.724406", "long": "-5.767212", "status": "operation", "mw": 10, "ext_id": "6845"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/12/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6845", "Record Last Updated (dd/mm/yyyy)": "12/12/2018", "Operator (or Applicant)": "AES Kilroot Power (AES KPL)", "Site Name": "AES Kilroot Station Battery Storage Array", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrickfergus", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT38 7LX", "X-coordinate": "157517", "Y-coordinate": "543117", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "18/11/2015", "Operational": "18/01/2016", "Heat Network Ref": "", "lat": "54.724406", "long": "-5.767212", "status": "operation", "mw": 10, "ext_id": "6845"}, "current_month": "2024-01", "dates": {"first_heard": "2018-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-12-12", "start_construction": "2015-11-18", "start_operation": "2016-01-18", "start_estimated": "", "month_disappeared": "", "go_live": "2016-01", "go_live_year_int": 2016, "name": "AES Kilroot Station Battery Storage Array", "name_short": "AES Kilroot Station Battery Storage...", "owner": "AES Kilroot Power (AES KPL)", "state": "northern ireland", "country": "uk", "lat": "54.724406", "long": "-5.767212", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.724406+-5.767212", "construction_time_month": 2, "construction_speed_mwh_per_month": 5, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sienna Solar Farm", "city": "", "id": "163", "external_id": "64632", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "99MT 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "163", "external_id": "64632", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sienna Solar Farm", "external_id": "64632", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "99MT 8me, LLC", "status": "planning", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"99MTB": {"first": {"year": "2024", "month": "12", "entity id": "64246", "entity name": "99MT 8me, LLC", "plant producer type": "IPP", "plant name": "Sienna Solar Farm", "plant state": "CA", "plant id": "64632", "generator id": "99MTB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64632", "date": "2024-12", "mw": 200}, "first_month": "2021-06", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2028-12", "extra": "delayed by 48 months", "change_type": "timing"}]}], "current": {"year": "2028", "month": "12", "entity id": "64246", "entity name": "99MT 8me, LLC", "plant producer type": "IPP", "plant name": "Sienna Solar Farm", "plant state": "CA", "plant id": "64632", "generator id": "99MTB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64632", "date": "2028-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-12", "month_disappeared": "", "go_live": "0 ~ 2028-12", "go_live_year_int": 2028, "name": "Sienna Solar Farm", "name_short": "Sienna Solar Farm", "owner": "99MT 8me, LLC", "state": "california", "country": "usa", "lat": "41.273154160953744", "long": "-121.1907209430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.273154160953744+-121.1907209430736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KCE CT 1, LLC", "city": "", "id": "1042", "external_id": "66879", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "210", "power_mw": "105", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1042", "external_id": "66879", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KCE CT 1, LLC", "external_id": "66879", "state": "connecticut", "country": "usa", "mwh": 0, "estimate_mwh": 210, "power_mw": 105, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2028-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CT1": {"first": {"year": "2027", "month": "5", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE CT 1, LLC", "plant state": "CT", "plant id": "66879", "generator id": "CT1", "net summer capacity (mw)": "105", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66879", "date": "2027-05", "mw": 105}, "first_month": "2023-09", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2027-05", "to": "2028-10", "extra": "delayed by 17 months", "change_type": "timing"}]}], "current": {"year": "2028", "month": "10", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE CT 1, LLC", "plant state": "CT", "plant id": "66879", "generator id": "CT1", "net summer capacity (mw)": "105", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66879", "date": "2028-10", "mw": 105}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 105, "mwh_is_estimate": true, "mwh": 210, "mwh_estimate": 210, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2028-10", "month_disappeared": "", "go_live": "0 ~ 2028-10", "go_live_year_int": 2028, "name": "KCE CT 1, LLC", "name_short": "KCE CT 1", "owner": "Key Capture Energy", "state": "connecticut", "country": "usa", "lat": "41.97707037128426", "long": "-71.9315418926975", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.97707037128426+-71.9315418926975", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Grid Intrepid", "city": "", "id": "1050", "external_id": "66911", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Hecate Grid Intrepid 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1050", "external_id": "66911", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Grid Intrepid", "external_id": "66911", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Hecate Grid Intrepid 1 LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2028-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"HGIN1": {"first": {"year": "2028", "month": "7", "entity id": "65821", "entity name": "Hecate Grid Intrepid 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Intrepid", "plant state": "NY", "plant id": "66911", "generator id": "HGIN1", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66911", "date": "2028-07", "mw": 250}, "first_month": "2023-09", "changes": [], "current": {"year": "2028", "month": "7", "entity id": "65821", "entity name": "Hecate Grid Intrepid 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Intrepid", "plant state": "NY", "plant id": "66911", "generator id": "HGIN1", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66911", "date": "2028-07", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}, "HGIN6": {"first": {"year": "2028", "month": "7", "entity id": "65821", "entity name": "Hecate Grid Intrepid 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Intrepid", "plant state": "NY", "plant id": "66911", "generator id": "HGIN6", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66911", "date": "2028-07", "mw": 50}, "first_month": "2023-09", "changes": [], "current": {"year": "2028", "month": "7", "entity id": "65821", "entity name": "Hecate Grid Intrepid 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Intrepid", "plant state": "NY", "plant id": "66911", "generator id": "HGIN6", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66911", "date": "2028-07", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2028-07", "month_disappeared": "", "go_live": "0 ~ 2028-07", "go_live_year_int": 2028, "name": "Hecate Grid Intrepid", "name_short": "Hecate Grid Intrepid", "owner": "Hecate Grid Intrepid 1 LLC", "state": "new york", "country": "usa", "lat": "42.652007", "long": "-75.60354", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.652007+-75.60354", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackcat BESS", "city": "", "id": "1361", "external_id": "67558", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1361", "external_id": "67558", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Blackcat BESS", "external_id": "67558", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "RIC Development, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RIC96": {"first": {"year": "2028", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Blackcat BESS", "plant state": "TX", "plant id": "67558", "generator id": "RIC96", "net summer capacity (mw)": "200.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67558", "date": "2028-04", "mw": 200}, "first_month": "2024-06", "changes": [], "current": {"year": "2028", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Blackcat BESS", "plant state": "TX", "plant id": "67558", "generator id": "RIC96", "net summer capacity (mw)": "200.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67558", "date": "2028-04", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "month_disappeared": "", "go_live": "0 ~ 2028-04", "go_live_year_int": 2028, "name": "Blackcat BESS", "name_short": "Blackcat", "owner": "RIC Development, LLC", "state": "texas", "country": "usa", "lat": "33.49793441320124", "long": "-95.13838797468608", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.49793441320124+-95.13838797468608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Serrano BESS", "city": "", "id": "1363", "external_id": "67556", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1363", "external_id": "67556", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Serrano BESS", "external_id": "67556", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "RIC Development, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RIC97": {"first": {"year": "2028", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Serrano BESS", "plant state": "TX", "plant id": "67556", "generator id": "RIC97", "net summer capacity (mw)": "185.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67556", "date": "2028-04", "mw": 185}, "first_month": "2024-06", "changes": [], "current": {"year": "2028", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Serrano BESS", "plant state": "TX", "plant id": "67556", "generator id": "RIC97", "net summer capacity (mw)": "185.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67556", "date": "2028-04", "mw": 185}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": true, "mwh": 370, "mwh_estimate": 370, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "month_disappeared": "", "go_live": "0 ~ 2028-04", "go_live_year_int": 2028, "name": "Serrano BESS", "name_short": "Serrano", "owner": "RIC Development, LLC", "state": "texas", "country": "usa", "lat": "33.60453116095374", "long": "-95.1641099430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.60453116095374+-95.1641099430736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cold Creek Solar", "city": "", "id": "1027", "external_id": "66674", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Cold Creek Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1027", "external_id": "66674", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cold Creek Solar", "external_id": "66674", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Cold Creek Solar, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2028-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CCBA": {"first": {"year": "2028", "month": "1", "entity id": "65688", "entity name": "Cold Creek Solar, LLC", "plant producer type": "IPP", "plant name": "Cold Creek Solar", "plant state": "NY", "plant id": "66674", "generator id": "CCBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66674", "date": "2028-01", "mw": 20}, "first_month": "2023-07", "changes": [], "current": {"year": "2028", "month": "1", "entity id": "65688", "entity name": "Cold Creek Solar, LLC", "plant producer type": "IPP", "plant name": "Cold Creek Solar", "plant state": "NY", "plant id": "66674", "generator id": "CCBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66674", "date": "2028-01", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2028-01", "month_disappeared": "", "go_live": "0 ~ 2028-01", "go_live_year_int": 2028, "name": "Cold Creek Solar", "name_short": "Cold Creek Solar", "owner": "Cold Creek Solar, LLC", "state": "new york", "country": "usa", "lat": "42.80895629690874", "long": "-75.61757033894474", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.80895629690874+-75.61757033894474", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kingsley Solar Farm", "city": "", "id": "159", "external_id": "64634", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "720", "power_mw": "360", "customer": "", "owner": "90FI 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "159", "external_id": "64634", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kingsley Solar Farm", "external_id": "64634", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 148, "power_mw": 74, "owner": "90FI 8me, LLC", "status": "planning", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"90FIB": {"first": {"year": "2024", "month": "6", "entity id": "64245", "entity name": "90FI 8me, LLC", "plant producer type": "IPP", "plant name": "Kingsley Solar Farm", "plant state": "CA", "plant id": "64634", "generator id": "90FIB", "net summer capacity (mw)": "360", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64634", "date": "2024-06", "mw": 360}, "first_month": "2021-06", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-06", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2025-06", "to": "2027-12", "extra": "delayed by 30 months", "change_type": "timing"}, {"name": "mw", "from": 360, "to": 74, "extra": "", "change_type": "misc"}]}], "current": {"year": "2027", "month": "12", "entity id": "64245", "entity name": "90FI 8me, LLC", "plant producer type": "IPP", "plant name": "Kingsley Solar Farm", "plant state": "CA", "plant id": "64634", "generator id": "90FIB", "net summer capacity (mw)": "74", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64634", "date": "2027-12", "mw": 74}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 74, "mwh_is_estimate": true, "mwh": 148, "mwh_estimate": 148, "status": "planning", "status_class": "", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Kingsley Solar Farm", "name_short": "Kingsley Solar Farm", "owner": "90FI 8me, LLC", "state": "california", "country": "usa", "lat": "41.03058993567627", "long": "-121.01663415814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.03058993567627+-121.01663415814404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Ripley Solar", "city": "", "id": "562", "external_id": "64911", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "ConnectGen Chautauqua County LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "562", "external_id": "64911", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "South Ripley Solar", "external_id": "64911", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "ConnectGen Chautauqua County LLC", "status": "planning", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CSRB1": {"first": {"year": "2023", "month": "12", "entity id": "64389", "entity name": "ConnectGen Chautauqua County LLC", "plant producer type": "IPP", "plant name": "South Ripley Solar", "plant state": "NY", "plant id": "64911", "generator id": "CSRB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64911", "date": "2023-12", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2026-12", "to": "2027-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "64389", "entity name": "ConnectGen Chautauqua County LLC", "plant producer type": "IPP", "plant name": "South Ripley Solar", "plant state": "NY", "plant id": "64911", "generator id": "CSRB1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64911", "date": "2027-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "South Ripley Solar", "name_short": "South Ripley Solar", "owner": "ConnectGen Chautauqua County LLC", "state": "new york", "country": "usa", "lat": "42.74840378137596", "long": "-75.3708612129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.74840378137596+-75.3708612129225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arida Solar (Hybrid)", "city": "", "id": "576", "external_id": "63841", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "326FW 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "576", "external_id": "63841", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arida Solar (Hybrid)", "external_id": "63841", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 740, "power_mw": 370, "owner": "326FW 8me LLC", "status": "planning", "date_first_heard": "2022-01", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "10", "entity id": "63520", "entity name": "326FW 8me LLC", "plant producer type": "IPP", "plant name": "Arida Solar (Hybrid)", "plant state": "NV", "plant id": "63841", "generator id": "BESS", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63841", "date": "2024-10", "mw": 185}, "first_month": "2022-01", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-10", "to": "2027-06", "extra": "delayed by 32 months", "change_type": "timing"}, {"name": "mw", "from": 185, "to": 370, "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2027-06", "to": "2027-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "63520", "entity name": "326FW 8me LLC", "plant producer type": "IPP", "plant name": "Arida Solar (Hybrid)", "plant state": "NV", "plant id": "63841", "generator id": "BESS", "net summer capacity (mw)": "370", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63841", "date": "2027-12", "mw": 370}, "current_month": "2024-06", "dates": {"first_heard": "2022-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 370, "mwh_is_estimate": true, "mwh": 740, "mwh_estimate": 740, "status": "planning", "status_class": "", "date_first_heard": "2022-01", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Arida Solar (Hybrid)", "name_short": "Arida Solar (Hybrid)", "owner": "326FW 8me LLC", "state": "nevada", "country": "usa", "lat": "41.28470862756772", "long": "-114.82195337753002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.28470862756772+-114.82195337753002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beartooth Energy Storage LLC", "city": "", "id": "682", "external_id": "65407", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Beartooth Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "682", "external_id": "65407", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beartooth Energy Storage LLC", "external_id": "65407", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Beartooth Energy Storage, LLC", "status": "planning", "date_first_heard": "2022-04", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BEAR1": {"first": {"year": "2024", "month": "4", "entity id": "64736", "entity name": "Beartooth Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Beartooth Energy Storage LLC", "plant state": "MT", "plant id": "65407", "generator id": "BEAR1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65407", "date": "2024-04", "mw": 50}, "first_month": "2022-04", "changes": [{"month": "2023-06", "li": [{"name": "date", "from": "2024-04", "to": "2027-12", "extra": "delayed by 44 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "64736", "entity name": "Beartooth Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Beartooth Energy Storage LLC", "plant state": "MT", "plant id": "65407", "generator id": "BEAR1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65407", "date": "2027-12", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-04", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Beartooth Energy Storage LLC", "name_short": "Beartooth Energy Storage", "owner": "Beartooth Energy Storage, LLC", "state": "montana", "country": "usa", "lat": "48.77072319146767", "long": "-105.5563965331475", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.77072319146767+-105.5563965331475", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crane 2 BESS 2", "city": "", "id": "987", "external_id": "66300", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "987", "external_id": "66300", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Crane 2 BESS 2", "external_id": "66300", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CRBS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Crane 2 BESS 2", "plant state": "TX", "plant id": "66300", "generator id": "CRBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66300", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2027-12", "extra": "delayed by 36 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Crane 2 BESS 2", "plant state": "TX", "plant id": "66300", "generator id": "CRBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66300", "date": "2027-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Crane 2 BESS 2", "name_short": "Crane 2 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.70808533623373", "long": "-95.45800256921983", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.70808533623373+-95.45800256921983", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Uvalde 2 BESS 2", "city": "", "id": "989", "external_id": "66305", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "989", "external_id": "66305", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Uvalde 2 BESS 2", "external_id": "66305", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UVBS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Uvalde 2 BESS 2", "plant state": "TX", "plant id": "66305", "generator id": "UVBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66305", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2027-12", "extra": "delayed by 36 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Uvalde 2 BESS 2", "plant state": "TX", "plant id": "66305", "generator id": "UVBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66305", "date": "2027-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Uvalde 2 BESS 2", "name_short": "Uvalde 2 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.56468208398623", "long": "-95.61391623283366", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.56468208398623+-95.61391623283366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Uvalde 2 BESS 1", "city": "", "id": "1001", "external_id": "66304", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1001", "external_id": "66304", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Uvalde 2 BESS 1", "external_id": "66304", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UVBS1": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Uvalde 2 BESS 1", "plant state": "TX", "plant id": "66304", "generator id": "UVBS1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66304", "date": "2024-05", "mw": 75}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2027-12", "extra": "delayed by 36 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Uvalde 2 BESS 1", "plant state": "TX", "plant id": "66304", "generator id": "UVBS1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66304", "date": "2027-12", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Uvalde 2 BESS 1", "name_short": "Uvalde 2 BESS 1", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.46085237387625", "long": "-95.2525147566415", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.46085237387625+-95.2525147566415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bonanza Solar and Storage Project", "city": "", "id": "1049", "external_id": "66908", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "390", "power_mw": "195", "customer": "", "owner": "EDF Renewables Development, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1049", "external_id": "66908", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bonanza Solar and Storage Project", "external_id": "66908", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 390, "power_mw": 195, "owner": "EDF Renewables Development, Inc.", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BZES": {"first": {"year": "2027", "month": "12", "entity id": "64452", "entity name": "EDF Renewables Development, Inc.", "plant producer type": "IPP", "plant name": "Bonanza Solar and Storage Project", "plant state": "NV", "plant id": "66908", "generator id": "BZES", "net summer capacity (mw)": "195", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66908", "date": "2027-12", "mw": 195}, "first_month": "2023-09", "changes": [], "current": {"year": "2027", "month": "12", "entity id": "64452", "entity name": "EDF Renewables Development, Inc.", "plant producer type": "IPP", "plant name": "Bonanza Solar and Storage Project", "plant state": "NV", "plant id": "66908", "generator id": "BZES", "net summer capacity (mw)": "195", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66908", "date": "2027-12", "mw": 195}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 195, "mwh_is_estimate": true, "mwh": 390, "mwh_estimate": 390, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Bonanza Solar and Storage Project", "name_short": "Bonanza Solar and Storage", "owner": "EDF Renewables Development, Inc.", "state": "nevada", "country": "usa", "lat": "41.629302724436236", "long": "-115.17039971153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.629302724436236+-115.17039971153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lupinus Solar 2, LLC", "city": "", "id": "1057", "external_id": "66896", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "244", "power_mw": "122", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1057", "external_id": "66896", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lupinus Solar 2, LLC", "external_id": "66896", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 244, "power_mw": 122, "owner": "Sunraycer Assets I LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LP2BA": {"first": {"year": "2027", "month": "12", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Lupinus Solar 2, LLC", "plant state": "TX", "plant id": "66896", "generator id": "LP2BA", "net summer capacity (mw)": "122.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66896", "date": "2027-12", "mw": 122}, "first_month": "2023-09", "changes": [], "current": {"year": "2027", "month": "12", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Lupinus Solar 2, LLC", "plant state": "TX", "plant id": "66896", "generator id": "LP2BA", "net summer capacity (mw)": "122.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66896", "date": "2027-12", "mw": 122}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 122, "mwh_is_estimate": true, "mwh": 244, "mwh_estimate": 244, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Lupinus Solar 2, LLC", "name_short": "Lupinus Solar 2", "owner": "Sunraycer Assets I LLC", "state": "texas", "country": "usa", "lat": "33.24856368342876", "long": "-95.12414054591771", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.24856368342876+-95.12414054591771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Powell Solar", "city": "", "id": "1316", "external_id": "67157", "state": "oregon", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1316", "external_id": "67157", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Powell Solar", "external_id": "67157", "state": "oregon", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Invenergy Services LLC", "status": "planning", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2027", "month": "12", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Powell Solar", "plant state": "OR", "plant id": "67157", "generator id": "BESS1", "net summer capacity (mw)": "20.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67157", "date": "2027-12", "mw": 20}, "first_month": "2024-02", "changes": [], "current": {"year": "2027", "month": "12", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Powell Solar", "plant state": "OR", "plant id": "67157", "generator id": "BESS1", "net summer capacity (mw)": "20.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67157", "date": "2027-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "month_disappeared": "", "go_live": "0 ~ 2027-12", "go_live_year_int": 2027, "name": "Powell Solar", "name_short": "Powell Solar", "owner": "Invenergy Services LLC", "state": "oregon", "country": "usa", "lat": "45.45769240952313", "long": "-118.089015416855", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:45.45769240952313+-118.089015416855", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kahana Solar, LLC", "city": "", "id": "215", "external_id": "64095", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Kahana Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "215", "external_id": "64095", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kahana Solar, LLC", "external_id": "64095", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "AES Clean Energy", "status": "planning", "date_first_heard": "2020-11", "start_construction": "", "start_operation": "", "start_estimated": "2027-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KSBA": {"first": {"year": "2023", "month": "12", "entity id": "63703", "entity name": "Kahana Solar, LLC", "plant producer type": "IPP", "plant name": "Kahana Solar, LLC", "plant state": "HI", "plant id": "64095", "generator id": "KSBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64095", "date": "2023-12", "mw": 20}, "first_month": "2020-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-12", "to": "2027-11", "extra": "delayed by 35 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "entity id", "from": "63703", "to": "64904", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Kahana Solar, LLC", "to": "AES Clean Energy", "extra": "", "change_type": "misc"}]}], "current": {"year": "2027", "month": "11", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Kahana Solar, LLC", "plant state": "HI", "plant id": "64095", "generator id": "KSBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64095", "date": "2027-11", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2020-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2020-11", "start_construction": "", "start_operation": "", "start_estimated": "2027-11", "month_disappeared": "", "go_live": "0 ~ 2027-11", "go_live_year_int": 2027, "name": "Kahana Solar, LLC", "name_short": "Kahana Solar", "owner": "AES Clean Energy", "state": "hawaii", "country": "usa", "lat": "19.481845", "long": "-155.513535", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.481845+-155.513535", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Red Antelope Solar & Energy Storage Farm", "city": "", "id": "144", "external_id": "64208", "state": "arizona", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "302PN 8me LLC", "developer": "8 minute", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.712788", "long": "-111.290085", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "", "project_website": "", "link1": "https://lakepowellchronicle.com/article/4000-acre-solar-project-proposed-near-page", "link2": "", "link3": "", "link4": ""}, "internal_id": "144", "external_id": "64208", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Red Antelope Solar & Energy Storage Farm", "external_id": "64208", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "302PN 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"30PNB": {"first": {"year": "2023", "month": "6", "entity id": "63807", "entity name": "302PN 8me LLC", "plant producer type": "IPP", "plant name": "Red Antelope Solar & Energy Storage Farm", "plant state": "AZ", "plant id": "64208", "generator id": "30PNB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64208", "date": "2023-06", "mw": 500}, "first_month": "2021-01", "changes": [{"month": "2022-02", "li": [{"name": "date", "from": "2023-06", "to": "2024-11", "extra": "delayed by 17 months", "change_type": "timing"}, {"name": "mw", "from": 500, "to": 300, "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-11", "to": "2027-05", "extra": "delayed by 30 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "5", "entity id": "63807", "entity name": "302PN 8me LLC", "plant producer type": "IPP", "plant name": "Red Antelope Solar & Energy Storage Farm", "plant state": "AZ", "plant id": "64208", "generator id": "30PNB", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64208", "date": "2027-05", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": false, "mwh": 1200, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "go_live": "0 ~ 2027-05", "go_live_year_int": 2027, "name": "Red Antelope Solar & Energy Storage Farm", "name_short": "Red Antelope Solar & Energy Storage...", "owner": "302PN 8me LLC", "state": "arizona", "country": "usa", "lat": "36.712788", "long": "-111.290085", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.712788+-111.290085", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://lakepowellchronicle.com/article/4000-acre-solar-project-proposed-near-page"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dynegy Oakland Power Plant", "city": "", "id": "185", "external_id": "6211", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72.6", "power_mw": "36.3", "customer": "", "owner": "Dynegy Oakland, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "185", "external_id": "6211", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dynegy Oakland Power Plant", "external_id": "6211", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 86, "power_mw": 43, "owner": "Dynegy Oakland, LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN4": {"first": {"year": "2022", "month": "12", "entity id": "54803", "entity name": "Dynegy Oakland, LLC", "plant producer type": "IPP", "plant name": "Dynegy Oakland Power Plant", "plant state": "CA", "plant id": "6211", "generator id": "GEN4", "net summer capacity (mw)": "36.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "6211", "date": "2022-12", "mw": 36}, "first_month": "2020-09", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-12", "to": "2023-07", "extra": "delayed by 7 months", "change_type": "timing"}, {"name": "mw", "from": 36, "to": 43, "extra": "", "change_type": "misc"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-07", "to": "2023-12", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-11", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-11", "to": "2027-05", "extra": "delayed by 30 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "5", "entity id": "54803", "entity name": "Dynegy Oakland, LLC", "plant producer type": "IPP", "plant name": "Dynegy Oakland Power Plant", "plant state": "CA", "plant id": "6211", "generator id": "GEN4", "net summer capacity (mw)": "43.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "6211", "date": "2027-05", "mw": 43}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 43, "mwh_is_estimate": true, "mwh": 86, "mwh_estimate": 86, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "go_live": "0 ~ 2027-05", "go_live_year_int": 2027, "name": "Dynegy Oakland Power Plant", "name_short": "Dynegy Oakland", "owner": "Dynegy Oakland, LLC", "state": "california", "country": "usa", "lat": "41.392677000000006", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.392677000000006+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Southern Bighorn Solar Hybrid", "city": "", "id": "227", "external_id": "63113", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "300MS 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "227", "external_id": "63113", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Southern Bighorn Solar Hybrid", "external_id": "63113", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "300MS 8me LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "9", "entity id": "62910", "entity name": "300MS 8me LLC", "plant producer type": "IPP", "plant name": "Southern Bighorn Solar Hybrid", "plant state": "NV", "plant id": "63113", "generator id": "BESS", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63113", "date": "2023-09", "mw": 135}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "date", "from": "2023-09", "to": "2024-04", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2024-04", "to": "2026-05", "extra": "delayed by 25 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2026-05", "to": "2027-05", "extra": "delayed by 12 months", "change_type": "timing"}, {"name": "mw", "from": 135, "to": 300, "extra": "", "change_type": "misc"}]}], "current": {"year": "2027", "month": "5", "entity id": "62910", "entity name": "300MS 8me LLC", "plant producer type": "IPP", "plant name": "Southern Bighorn Solar Hybrid", "plant state": "NV", "plant id": "63113", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63113", "date": "2027-05", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "month_disappeared": "", "go_live": "0 ~ 2027-05", "go_live_year_int": 2027, "name": "Southern Bighorn Solar Hybrid", "name_short": "Southern Bighorn Solar", "owner": "300MS 8me LLC", "state": "nevada", "country": "usa", "lat": "41.70034529690874", "long": "-115.02003633894475", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.70034529690874+-115.02003633894475", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aragon Energy Storage", "city": "", "id": "967", "external_id": "66431", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Aragon Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "967", "external_id": "66431", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Aragon Energy Storage", "external_id": "66431", "state": "georgia", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Aragon Energy Storage LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARAG1": {"first": {"year": "2026", "month": "10", "entity id": "65511", "entity name": "Aragon Energy Storage LLC", "plant producer type": "IPP", "plant name": "Aragon Energy Storage", "plant state": "GA", "plant id": "66431", "generator id": "ARAG1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66431", "date": "2026-10", "mw": 150}, "first_month": "2023-04", "changes": [{"month": "2024-03", "li": [{"name": "date", "from": "2026-10", "to": "2027-04", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2027", "month": "4", "entity id": "65511", "entity name": "Aragon Energy Storage LLC", "plant producer type": "IPP", "plant name": "Aragon Energy Storage", "plant state": "GA", "plant id": "66431", "generator id": "ARAG1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66431", "date": "2027-04", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "month_disappeared": "", "go_live": "0 ~ 2027-04", "go_live_year_int": 2027, "name": "Aragon Energy Storage", "name_short": "Aragon", "owner": "Aragon Energy Storage LLC", "state": "georgia", "country": "usa", "lat": "32.42626065645874", "long": "-82.16026015912814", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.42626065645874+-82.16026015912814", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jim Wells BESS", "city": "", "id": "1366", "external_id": "67553", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1366", "external_id": "67553", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Jim Wells BESS", "external_id": "67553", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "RIC Development, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RIC99": {"first": {"year": "2027", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Jim Wells BESS", "plant state": "TX", "plant id": "67553", "generator id": "RIC99", "net summer capacity (mw)": "100.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67553", "date": "2027-04", "mw": 100}, "first_month": "2024-06", "changes": [], "current": {"year": "2027", "month": "4", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Jim Wells BESS", "plant state": "TX", "plant id": "67553", "generator id": "RIC99", "net summer capacity (mw)": "100.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67553", "date": "2027-04", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "month_disappeared": "", "go_live": "0 ~ 2027-04", "go_live_year_int": 2027, "name": "Jim Wells BESS", "name_short": "Jim Wells", "owner": "RIC Development, LLC", "state": "texas", "country": "usa", "lat": "33.69372024210638", "long": "-95.35131028258249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.69372024210638+-95.35131028258249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Xlinks (Morocco UK)", "city": "", "id": "124", "external_id": "", "state": "", "country": "morocco", "capacity_mwh": "20000", "estimate_mwh": "", "power_mw": "5000", "customer": "", "owner": "xlinks", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-04", "start_construction": "", "start_operation": "", "start_estimated": "2027", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "28.127867", "long": "-11.599926", "coords_hint": "0", "use_case": "7000MW solar farm support ** 3500MW wind farm support ** remote generation for UK (3800km HVDC cable)", "notes": "2021: this is early stage and not guaranteed to happened, but putting it there as it is a very ambitious project and more of those are needed ** construction to start in 2025, the first systems to go onine in 2027 ** PPA at 48 GBP / Mwh ** the youtube video is a great overview", "project_website": "https://xlinks.co/morocco-uk-power-project/", "link1": "https://www.greentechmedia.com/articles/read/xlinks-revives-desertecs-dream-with-a-few-twists", "link2": "https://www.youtube.com/watch?v=iJunxkln578", "link3": "", "link4": ""}, "internal_id": "124", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 5000, "mwh_is_estimate": false, "mwh": 20000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-12-04", "start_construction": "", "start_operation": "", "start_estimated": "2027", "month_disappeared": "", "go_live": "0 ~ 2027", "go_live_year_int": 2027, "name": "Xlinks (Morocco UK)", "name_short": "Xlinks (Morocco UK)", "owner": "xlinks", "state": "", "country": "morocco", "lat": "28.127867", "long": "-11.599926", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:28.127867+-11.599926", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2021: this is early stage and not guaranteed to happened, but putting it there as it is a very ambitious project and more of those are needed ", " construction to start in 2025, the first systems to go onine in 2027 ", " PPA at 48 GBP / Mwh ", " the youtube video is a great overview"], "links": ["https://www.greentechmedia.com/articles/read/xlinks-revives-desertecs-dream-with-a-few-twists", "https://www.youtube.com/watch?v=iJunxkln578"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hornsea Project Three - Battery Storage", "city": "", "id": "1379", "external_id": "9754", "state": "eastern", "country": "uk", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "Orsted Power (UK) Limited", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1800920444276543858", "link2": "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511", "link3": "", "link4": ""}, "internal_id": "1379", "external_id": "9754", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hornsea Project Three - Battery Storage", "external_id": "9754", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Orsted Power (UK) Limited", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.575424", "long": "1.247254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9754", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "Orsted Power (UK) Limited", "Site Name": "Hornsea Project Three - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Main Road, Swardeston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR4 6US", "X-coordinate": "620129", "Y-coordinate": "302465", "Planning Authority": "South Norfolk District Council", "Planning Application Reference": "2022/0867", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.575424", "long": "1.247254", "status": "planning", "mw": 200, "ext_id": "9754"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9754", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "Orsted Power (UK) Limited", "Site Name": "Hornsea Project Three - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Main Road, Swardeston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR4 6US", "X-coordinate": "620129", "Y-coordinate": "302465", "Planning Authority": "South Norfolk District Council", "Planning Application Reference": "2022/0867", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.575424", "long": "1.247254", "status": "planning", "mw": 200, "ext_id": "9754"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "month_disappeared": "", "go_live": "0 ~ 2026Q4", "go_live_year_int": 2026, "name": "Hornsea Project Three - Battery Storage", "name_short": "Hornsea Project Three", "owner": "Orsted Power (UK) Limited", "state": "eastern", "country": "uk", "lat": "52.575424", "long": "1.247254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.575424+1.247254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://x.com/Tesla_Megapack/status/1800920444276543858", "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Netzbooster Kupferzell", "city": "Kupferzell", "id": "97", "external_id": "", "state": "bw", "country": "germany", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "TransnetBW", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-01", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "cost_million": "200", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "49.232801", "long": "9.694664", "coords_hint": "0", "use_case": "virtual transmission lines", "notes": "this is a pilot project and still it takes 5 years to build, will be interesting how long they will take for real projects then, ca 200 Million Euro costs", "project_website": "https://www.transnetbw.de/de/netzentwicklung/projekte/netzbooster-pilotanlage/projektueberblick", "link1": "https://www.transnetbw.de/files/pdf/netzentwicklung/projekte/netzbooster-pilotanlage/Vorstellung_Netzbooster.pdf", "link2": "https://www.energy-storage.news/fluence-building-250mw-grid-booster-battery-storage-system-for-german-tso-transnetbw/", "link3": "", "link4": ""}, "internal_id": "97", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2019-12-01", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "month_disappeared": "", "go_live": "0 ~ 2026Q1", "go_live_year_int": 2026, "name": "Netzbooster Kupferzell", "name_short": "Netzbooster Kupferzell", "owner": "TransnetBW", "state": "bw", "country": "germany", "lat": "49.232801", "long": "9.694664", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.232801+9.694664", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["this is a pilot project and still it takes 5 years to build, will be interesting how long they will take for real projects then, ca 200 Million Euro costs"], "links": ["https://www.transnetbw.de/files/pdf/netzentwicklung/projekte/netzbooster-pilotanlage/Vorstellung_Netzbooster.pdf", "https://www.energy-storage.news/fluence-building-250mw-grid-booster-battery-storage-system-for-german-tso-transnetbw/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Glenbrook", "city": "glenbrook", "id": "1397", "external_id": "", "state": "", "country": "new zealand", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Contact Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "cost_million": "163", "cost_currency": "NZD", "cost_incl_solar": "0", "lat": "-37.203762", "long": "174.734204", "coords_hint": "2", "use_case": "", "notes": "location from the steal site and substation", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1807635731197702615", "link2": "https://www.nzherald.co.nz/business/glenbrook-to-get-big-grid-scale-battery-as-contact-teams-up-with-tesla/5KULSHHUVFEWFBSXYU3G42ONEE/", "link3": "https://www.pv-magazine-australia.com/2024/07/10/contact-teams-with-tesla-on-200-mwh-battery-for-nz/", "link4": ""}, "internal_id": "1397", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "month_disappeared": "", "go_live": "0 ~ 2026Q1", "go_live_year_int": 2026, "name": "Glenbrook", "name_short": "Glenbrook", "owner": "Contact Energy", "state": "", "country": "new zealand", "lat": "-37.203762", "long": "174.734204", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-37.203762+174.734204", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from the steal site and substation"], "links": ["https://x.com/SawyerMerritt/status/1807635731197702615", "https://www.nzherald.co.nz/business/glenbrook-to-get-big-grid-scale-battery-as-contact-teams-up-with-tesla/5KULSHHUVFEWFBSXYU3G42ONEE/", "https://www.pv-magazine-australia.com/2024/07/10/contact-teams-with-tesla-on-200-mwh-battery-for-nz/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Clermont", "city": "Lindenhurst", "id": "126", "external_id": "64236", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.701265", "long": "-73.366732", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, "internal_id": "126", "external_id": "64236", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Clermont", "external_id": "64236", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Hecate Grid Clermont 1 LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CLRMT": {"first": {"year": "2023", "month": "12", "entity id": "63839", "entity name": "Hecate Grid Clermont 1 LLC", "plant producer type": "IPP", "plant name": "Clermont", "plant state": "NY", "plant id": "64236", "generator id": "CLRMT", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64236", "date": "2023-12", "mw": 100}, "first_month": "2021-01", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "63839", "entity name": "Hecate Grid Clermont 1 LLC", "plant producer type": "IPP", "plant name": "Clermont", "plant state": "NY", "plant id": "64236", "generator id": "CLRMT", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64236", "date": "2026-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Clermont", "name_short": "Clermont", "owner": "Hecate Grid Clermont 1 LLC", "state": "new york", "country": "usa", "lat": "40.701265", "long": "-73.366732", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.701265+-73.366732", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "NY2 Battery", "city": "", "id": "234", "external_id": "63584", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "234", "external_id": "63584", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "NY2 Battery", "external_id": "63584", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 338, "power_mw": 169, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NY2": {"first": {"year": "2021", "month": "11", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "NY2 Battery", "plant state": "NY", "plant id": "63584", "generator id": "NY2", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63584", "date": "2021-11", "mw": 200}, "first_month": "2020-09", "changes": [{"month": "2021-04", "li": [{"name": "date", "from": "2021-11", "to": "2022-11", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2022-11", "to": "2023-06", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-06", "to": "2024-06", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "mw", "from": 200, "to": 169, "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "NY2 Battery", "plant state": "NY", "plant id": "63584", "generator id": "NY2", "net summer capacity (mw)": "169", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63584", "date": "2026-12", "mw": 169}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 169, "mwh_is_estimate": true, "mwh": 338, "mwh_estimate": 338, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "NY2 Battery", "name_short": "NY2 Battery", "owner": "Key Capture Energy", "state": "new york", "country": "usa", "lat": "42.51125063558831", "long": "-75.5492745151675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.51125063558831+-75.5492745151675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dulles Solar and Storage", "city": "", "id": "564", "external_id": "65043", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Dominion Energy Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "564", "external_id": "65043", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dulles Solar and Storage", "external_id": "65043", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Dominion Energy Inc.", "status": "planning", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DUST": {"first": {"year": "2023", "month": "10", "entity id": "5248", "entity name": "Dominion Energy Inc", "plant producer type": "Electric Utility", "plant name": "Dulles Solar and Storage", "plant state": "VA", "plant id": "65043", "generator id": "DUST", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65043", "date": "2023-10", "mw": 50}, "first_month": "2021-11", "changes": [{"month": "2022-12", "li": [{"name": "date", "from": "2023-10", "to": "2024-12", "extra": "delayed by 14 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "entity name", "from": "Dominion Energy Inc", "to": "Dominion Energy Inc.", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "5248", "entity name": "Dominion Energy Inc.", "plant producer type": "Electric Utility", "plant name": "Dulles Solar and Storage", "plant state": "VA", "plant id": "65043", "generator id": "DUST", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65043", "date": "2026-12", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Dulles Solar and Storage", "name_short": "Dulles Solar", "owner": "Dominion Energy Inc.", "state": "virginia", "country": "usa", "lat": "38.35804275538939", "long": "-77.74447446517001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.35804275538939+-77.74447446517001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sacramento Valley Energy Center, LLC", "city": "", "id": "775", "external_id": "65808", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Sacramento Valley Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "775", "external_id": "65808", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sacramento Valley Energy Center, LLC", "external_id": "65808", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Sacramento Valley Energy Center, LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BSVEC": {"first": {"year": "2024", "month": "12", "entity id": "65072", "entity name": "Sacramento Valley Energy Center, LLC", "plant producer type": "IPP", "plant name": "Sacramento Valley Energy Center, LLC", "plant state": "CA", "plant id": "65808", "generator id": "BSVEC", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65808", "date": "2024-12", "mw": 100}, "first_month": "2022-09", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2026-12", "to": "2024-12", "extra": "accelerated by 24 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "65072", "entity name": "Sacramento Valley Energy Center, LLC", "plant producer type": "IPP", "plant name": "Sacramento Valley Energy Center, LLC", "plant state": "CA", "plant id": "65808", "generator id": "BSVEC", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65808", "date": "2026-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Sacramento Valley Energy Center, LLC", "name_short": "Sacramento Valley Energy Center", "owner": "Sacramento Valley Energy Center, LLC", "state": "california", "country": "usa", "lat": "40.872677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.872677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Honey Creek Solar", "city": "", "id": "778", "external_id": "65821", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "778", "external_id": "65821", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Honey Creek Solar", "external_id": "65821", "state": "indiana", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HNYBA": {"first": {"year": "2024", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Honey Creek Solar", "plant state": "IN", "plant id": "65821", "generator id": "HNYBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65821", "date": "2024-12", "mw": 20}, "first_month": "2022-09", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Honey Creek Solar", "plant state": "IN", "plant id": "65821", "generator id": "HNYBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65821", "date": "2026-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Honey Creek Solar", "name_short": "Honey Creek Solar", "owner": "Leeward Asset Management, LLC", "state": "indiana", "country": "usa", "lat": "41.159394860275576", "long": "-85.07668862977751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.159394860275576+-85.07668862977751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elio Energy LLC", "city": "", "id": "798", "external_id": "65850", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Elio Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "798", "external_id": "65850", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elio Energy LLC", "external_id": "65850", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Elio Energy LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELIBS": {"first": {"year": "2025", "month": "6", "entity id": "65080", "entity name": "Elio Energy LLC", "plant producer type": "IPP", "plant name": "Elio Energy LLC", "plant state": "TX", "plant id": "65850", "generator id": "ELIBS", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65850", "date": "2025-06", "mw": 80}, "first_month": "2022-09", "changes": [{"month": "2023-03", "li": [{"name": "mw", "from": 80, "to": 300, "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2025-06", "to": "2026-12", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "65080", "entity name": "Elio Energy LLC", "plant producer type": "IPP", "plant name": "Elio Energy LLC", "plant state": "TX", "plant id": "65850", "generator id": "ELIBS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65850", "date": "2026-12", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Elio Energy LLC", "name_short": "Elio Energy", "owner": "Elio Energy LLC", "state": "texas", "country": "usa", "lat": "33.244802450183876", "long": "-94.98542795000252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.244802450183876+-94.98542795000252", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Buena Vista Energy LLC", "city": "", "id": "934", "external_id": "56446", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "934", "external_id": "56446", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Buena Vista Energy LLC", "external_id": "56446", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BVBAT": {"first": {"year": "2026", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Buena Vista Energy LLC", "plant state": "CA", "plant id": "56446", "generator id": "BVBAT", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "56446", "date": "2026-12", "mw": 100}, "first_month": "2023-02", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Buena Vista Energy LLC", "plant state": "CA", "plant id": "56446", "generator id": "BVBAT", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "56446", "date": "2026-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Buena Vista Energy LLC", "name_short": "Buena Vista Energy", "owner": "Leeward Asset Management, LLC", "state": "california", "country": "usa", "lat": "40.98192063558832", "long": "-121.3457835151675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98192063558832+-121.3457835151675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grey Fox Wind", "city": "", "id": "970", "external_id": "65939", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Grey Fox Wind", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "970", "external_id": "65939", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Grey Fox Wind", "external_id": "65939", "state": "illinois", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Grey Fox Wind", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WNDG2": {"first": {"year": "2026", "month": "12", "entity id": "65113", "entity name": "Grey Fox Wind", "plant producer type": "IPP", "plant name": "Grey Fox Wind", "plant state": "IL", "plant id": "65939", "generator id": "WNDG2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65939", "date": "2026-12", "mw": 150}, "first_month": "2023-05", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "65113", "entity name": "Grey Fox Wind", "plant producer type": "IPP", "plant name": "Grey Fox Wind", "plant state": "IL", "plant id": "65939", "generator id": "WNDG2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65939", "date": "2026-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Grey Fox Wind", "name_short": "Grey Fox Wind", "owner": "Grey Fox Wind", "state": "illinois", "country": "usa", "lat": "42.325716", "long": "-88.847031", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.325716+-88.847031", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Springwater Solar, LLC", "city": "", "id": "976", "external_id": "65900", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Springwater Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "976", "external_id": "65900", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Springwater Solar, LLC", "external_id": "65900", "state": "ohio", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Springwater Solar, LLC", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SPRI2": {"first": {"year": "2026", "month": "2", "entity id": "65092", "entity name": "Springwater Solar, LLC", "plant producer type": "IPP", "plant name": "Springwater Solar, LLC", "plant state": "OH", "plant id": "65900", "generator id": "SPRI2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65900", "date": "2026-02", "mw": 75}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2026-02", "to": "2026-12", "extra": "delayed by 10 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "65092", "entity name": "Springwater Solar, LLC", "plant producer type": "IPP", "plant name": "Springwater Solar, LLC", "plant state": "OH", "plant id": "65900", "generator id": "SPRI2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65900", "date": "2026-12", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Springwater Solar, LLC", "name_short": "Springwater Solar", "owner": "Springwater Solar, LLC", "state": "ohio", "country": "usa", "lat": "41.129863627567715", "long": "-81.07109237753002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.129863627567715+-81.07109237753002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upton BESS 2", "city": "", "id": "988", "external_id": "66303", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "988", "external_id": "66303", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Upton BESS 2", "external_id": "66303", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"UPBS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Upton BESS 2", "plant state": "TX", "plant id": "66303", "generator id": "UPBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66303", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2026-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Upton BESS 2", "plant state": "TX", "plant id": "66303", "generator id": "UPBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66303", "date": "2026-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Upton BESS 2", "name_short": "Upton BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.65154984477027", "long": "-95.54526771010998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65154984477027+-95.54526771010998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peeler Solar, LLC", "city": "", "id": "999", "external_id": "65932", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Peeler Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "999", "external_id": "65932", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peeler Solar, LLC", "external_id": "65932", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Peeler Solar, LLC", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PEEL2": {"first": {"year": "2025", "month": "10", "entity id": "65105", "entity name": "Peeler Solar, LLC", "plant producer type": "IPP", "plant name": "Peeler Solar, LLC", "plant state": "TX", "plant id": "65932", "generator id": "PEEL2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65932", "date": "2025-10", "mw": 100}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2025-10", "to": "2026-12", "extra": "delayed by 14 months", "change_type": "timing"}, {"name": "mw", "from": 100, "to": 50, "extra": "", "change_type": "misc"}]}], "current": {"year": "2026", "month": "12", "entity id": "65105", "entity name": "Peeler Solar, LLC", "plant producer type": "IPP", "plant name": "Peeler Solar, LLC", "plant state": "TX", "plant id": "65932", "generator id": "PEEL2", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65932", "date": "2026-12", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Peeler Solar, LLC", "name_short": "Peeler Solar", "owner": "Peeler Solar, LLC", "state": "texas", "country": "usa", "lat": "33.33724557612627", "long": "-94.91393863684043", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.33724557612627+-94.91393863684043", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wildcat Solar Power Plant LLC", "city": "", "id": "1351", "external_id": "64849", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Solariant Capital, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1351", "external_id": "64849", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wildcat Solar Power Plant LLC", "external_id": "64849", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Solariant Capital, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ATMWS": {"first": {"year": "2026", "month": "12", "entity id": "64355", "entity name": "Solariant Capital, LLC", "plant producer type": "IPP", "plant name": "Wildcat Solar Power Plant LLC", "plant state": "NM", "plant id": "64849", "generator id": "ATMWS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64849", "date": "2026-12", "mw": 50}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "64355", "entity name": "Solariant Capital, LLC", "plant producer type": "IPP", "plant name": "Wildcat Solar Power Plant LLC", "plant state": "NM", "plant id": "64849", "generator id": "ATMWS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64849", "date": "2026-12", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Wildcat Solar Power Plant LLC", "name_short": "Wildcat Solar Power Plant", "owner": "Solariant Capital, LLC", "state": "new mexico", "country": "usa", "lat": "36.412160926686255", "long": "-103.794007894988", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.412160926686255+-103.794007894988", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rock Rose Energy Storage LLC", "city": "", "id": "1359", "external_id": "67249", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Rock Rose Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1359", "external_id": "67249", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rock Rose Energy Storage LLC", "external_id": "67249", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Rock Rose Energy Storage LLC", "status": "planning", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RRES": {"first": {"year": "2026", "month": "12", "entity id": "66121", "entity name": "Rock Rose Energy Storage LLC", "plant producer type": "IPP", "plant name": "Rock Rose Energy Storage LLC", "plant state": "TX", "plant id": "67249", "generator id": "RRES", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67249", "date": "2026-12", "mw": 200}, "first_month": "2024-03", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "66121", "entity name": "Rock Rose Energy Storage LLC", "plant producer type": "IPP", "plant name": "Rock Rose Energy Storage LLC", "plant state": "TX", "plant id": "67249", "generator id": "RRES", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67249", "date": "2026-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Rock Rose Energy Storage LLC", "name_short": "Rock Rose Energy Storage", "owner": "Rock Rose Energy Storage LLC", "state": "texas", "country": "usa", "lat": "33.361966935676264", "long": "-94.99002315814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.361966935676264+-94.99002315814404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SGT Hoskins Solar Project Hybrid", "city": "", "id": "1365", "external_id": "67341", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "204", "power_mw": "102", "customer": "", "owner": "SGT Hoskins Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1365", "external_id": "67341", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "SGT Hoskins Solar Project Hybrid", "external_id": "67341", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 204, "power_mw": 102, "owner": "SGT Hoskins Solar Project, LLC", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NOSES": {"first": {"year": "2026", "month": "12", "entity id": "66171", "entity name": "SGT Hoskins Solar Project, LLC", "plant producer type": "IPP", "plant name": "SGT Hoskins Solar Project Hybrid", "plant state": "TX", "plant id": "67341", "generator id": "NOSES", "net summer capacity (mw)": "102.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67341", "date": "2026-12", "mw": 102}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "66171", "entity name": "SGT Hoskins Solar Project, LLC", "plant producer type": "IPP", "plant name": "SGT Hoskins Solar Project Hybrid", "plant state": "TX", "plant id": "67341", "generator id": "NOSES", "net summer capacity (mw)": "102.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67341", "date": "2026-12", "mw": 102}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 102, "mwh_is_estimate": true, "mwh": 204, "mwh_estimate": 204, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "SGT Hoskins Solar Project Hybrid", "name_short": "SGT Hoskins Solar", "owner": "SGT Hoskins Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.684053999999996", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.684053999999996+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cairos Solar and Storage", "city": "", "id": "1367", "external_id": "67581", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "154", "power_mw": "77", "customer": "", "owner": "Samsung C&T Renewables, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1367", "external_id": "67581", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cairos Solar and Storage", "external_id": "67581", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 154, "power_mw": 77, "owner": "Samsung C&T Renewables, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CIRSB": {"first": {"year": "2026", "month": "12", "entity id": "65144", "entity name": "Samsung C&T Renewables, LLC", "plant producer type": "IPP", "plant name": "Cairos Solar and Storage", "plant state": "TX", "plant id": "67581", "generator id": "CIRSB", "net summer capacity (mw)": "77.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67581", "date": "2026-12", "mw": 77}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "12", "entity id": "65144", "entity name": "Samsung C&T Renewables, LLC", "plant producer type": "IPP", "plant name": "Cairos Solar and Storage", "plant state": "TX", "plant id": "67581", "generator id": "CIRSB", "net summer capacity (mw)": "77.3", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67581", "date": "2026-12", "mw": 77}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 77, "mwh_is_estimate": true, "mwh": 154, "mwh_estimate": 154, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "month_disappeared": "", "go_live": "0 ~ 2026-12", "go_live_year_int": 2026, "name": "Cairos Solar and Storage", "name_short": "Cairos Solar", "owner": "Samsung C&T Renewables, LLC", "state": "texas", "country": "usa", "lat": "33.67572465645873", "long": "-95.43449115912814", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.67572465645873+-95.43449115912814", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bellefield 2 Solar & Energy Storage Farm", "city": "", "id": "157", "external_id": "64209", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "26SB 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "157", "external_id": "64209", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bellefield 2 Solar & Energy Storage Farm", "external_id": "64209", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 1000, "power_mw": 500, "owner": "26SB 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"26SBB": {"first": {"year": "2023", "month": "6", "entity id": "63806", "entity name": "26SB 8me LLC", "plant producer type": "IPP", "plant name": "Bellefield 2 Solar & Energy Storage Farm", "plant state": "CA", "plant id": "64209", "generator id": "26SBB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64209", "date": "2023-06", "mw": 500}, "first_month": "2021-01", "changes": [{"month": "2022-02", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2024-12", "to": "2026-11", "extra": "delayed by 23 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "11", "entity id": "63806", "entity name": "26SB 8me LLC", "plant producer type": "IPP", "plant name": "Bellefield 2 Solar & Energy Storage Farm", "plant state": "CA", "plant id": "64209", "generator id": "26SBB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64209", "date": "2026-11", "mw": 500}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 500, "mwh_is_estimate": true, "mwh": 1000, "mwh_estimate": 1000, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "go_live": "0 ~ 2026-11", "go_live_year_int": 2026, "name": "Bellefield 2 Solar & Energy Storage Farm", "name_short": "Bellefield 2 Solar & Energy Storage...", "owner": "26SB 8me LLC", "state": "california", "country": "usa", "lat": "40.91718668342877", "long": "-121.15075154591771", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.91718668342877+-121.15075154591771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Deer Wood Storage, LLC", "city": "", "id": "580", "external_id": "65145", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Deer Wood Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "580", "external_id": "65145", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Deer Wood Storage, LLC", "external_id": "65145", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Deer Wood Storage, LLC", "status": "planning", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ENX12": {"first": {"year": "2025", "month": "4", "entity id": "64519", "entity name": "Deer Wood Storage, LLC", "plant producer type": "IPP", "plant name": "Deer Wood Storage, LLC", "plant state": "VA", "plant id": "65145", "generator id": "ENX12", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65145", "date": "2025-04", "mw": 30}, "first_month": "2021-12", "changes": [{"month": "2024-03", "li": [{"name": "date", "from": "2025-04", "to": "2026-11", "extra": "delayed by 19 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "11", "entity id": "64519", "entity name": "Deer Wood Storage, LLC", "plant producer type": "IPP", "plant name": "Deer Wood Storage, LLC", "plant state": "VA", "plant id": "65145", "generator id": "ENX12", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65145", "date": "2026-11", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "go_live": "0 ~ 2026-11", "go_live_year_int": 2026, "name": "Deer Wood Storage, LLC", "name_short": "Deer Wood Storage", "owner": "Deer Wood Storage, LLC", "state": "virginia", "country": "usa", "lat": "38.160223", "long": "-77.64875", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.160223+-77.64875", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trestles Grid LLC", "city": "", "id": "1335", "external_id": "67229", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Trestles Grid LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1335", "external_id": "67229", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Trestles Grid LLC", "external_id": "67229", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Trestles Grid LLC", "status": "construction", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HGLPT": {"first": {"year": "2026", "month": "11", "entity id": "66105", "entity name": "Trestles Grid LLC", "plant producer type": "IPP", "plant name": "Trestles Grid LLC", "plant state": "CA", "plant id": "67229", "generator id": "HGLPT", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67229", "date": "2026-11", "mw": 150}, "first_month": "2024-03", "changes": [], "current": {"year": "2026", "month": "11", "entity id": "66105", "entity name": "Trestles Grid LLC", "plant producer type": "IPP", "plant name": "Trestles Grid LLC", "plant state": "CA", "plant id": "67229", "generator id": "HGLPT", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67229", "date": "2026-11", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "month_disappeared": "", "go_live": "0 ~ 2026-11", "go_live_year_int": 2026, "name": "Trestles Grid LLC", "name_short": "Trestles Grid", "owner": "Trestles Grid LLC", "state": "california", "country": "usa", "lat": "40.952677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.952677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "city": "", "id": "184", "external_id": "62892", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "EDPR CA Solar Park VI LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "184", "external_id": "62892", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "external_id": "62892", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "EDPR CA Solar Park VI LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SONR2": {"first": {"year": "2022", "month": "12", "entity id": "62760", "entity name": "EDPR CA Solar Park VI LLC", "plant producer type": "IPP", "plant name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "plant state": "CA", "plant id": "62892", "generator id": "SONR2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62892", "date": "2022-12", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-12", "to": "2023-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-12", "to": "2026-10", "extra": "delayed by 22 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "10", "entity id": "62760", "entity name": "EDPR CA Solar Park VI LLC", "plant producer type": "IPP", "plant name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "plant state": "CA", "plant id": "62892", "generator id": "SONR2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62892", "date": "2026-10", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "month_disappeared": "", "go_live": "0 ~ 2026-10", "go_live_year_int": 2026, "name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "name_short": "EDPR CA Solar Park VI LLC (CA)", "owner": "EDPR CA Solar Park VI LLC", "state": "california", "country": "usa", "lat": "41.3585390160412", "long": "-121.22341278539501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.3585390160412+-121.22341278539501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holly Branch Solar, LLC", "city": "", "id": "1033", "external_id": "66692", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Holly Branch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1033", "external_id": "66692", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Holly Branch Solar, LLC", "external_id": "66692", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Holly Branch Solar, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HOLY": {"first": {"year": "2026", "month": "10", "entity id": "65698", "entity name": "Holly Branch Solar, LLC", "plant producer type": "IPP", "plant name": "Holly Branch Solar, LLC", "plant state": "TX", "plant id": "66692", "generator id": "HOLY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66692", "date": "2026-10", "mw": 100}, "first_month": "2023-07", "changes": [], "current": {"year": "2026", "month": "10", "entity id": "65698", "entity name": "Holly Branch Solar, LLC", "plant producer type": "IPP", "plant name": "Holly Branch Solar, LLC", "plant state": "TX", "plant id": "66692", "generator id": "HOLY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66692", "date": "2026-10", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "month_disappeared": "", "go_live": "0 ~ 2026-10", "go_live_year_int": 2026, "name": "Holly Branch Solar, LLC", "name_short": "Holly Branch Solar", "owner": "Holly Branch Solar, LLC", "state": "texas", "country": "usa", "lat": "33.35211785870876", "long": "-95.34749894178886", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.35211785870876+-95.34749894178886", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Second Division Solar", "city": "", "id": "1190", "external_id": "65981", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1190", "external_id": "65981", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Second Division Solar", "external_id": "65981", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Lightsource Renewable Energy Asset Management, LLC", "status": "planning", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TXSD2": {"first": {"year": "2025", "month": "3", "entity id": "62842", "entity name": "Lightsource Renewable Energy Asset Management, LLC", "plant producer type": "IPP", "plant name": "Second Division Solar", "plant state": "TX", "plant id": "65981", "generator id": "TXSD2", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65981", "date": "2025-03", "mw": 30}, "first_month": "2023-12", "changes": [{"month": "2024-05", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-03", "to": "2026-09", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "9", "entity id": "62842", "entity name": "Lightsource Renewable Energy Asset Management, LLC", "plant producer type": "IPP", "plant name": "Second Division Solar", "plant state": "TX", "plant id": "65981", "generator id": "TXSD2", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65981", "date": "2026-09", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "go_live": "0 ~ 2026-09", "go_live_year_int": 2026, "name": "Second Division Solar", "name_short": "Second Division Solar", "owner": "Lightsource Renewable Energy Asset Management, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.453438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.453438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Starr Solar Ranch", "city": "", "id": "1191", "external_id": "65975", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1191", "external_id": "65975", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Starr Solar Ranch", "external_id": "65975", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 360, "power_mw": 180, "owner": "Lightsource Renewable Energy Asset Management, LLC", "status": "planning", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TXSD2": {"first": {"year": "2025", "month": "3", "entity id": "62842", "entity name": "Lightsource Renewable Energy Asset Management, LLC", "plant producer type": "IPP", "plant name": "Starr Solar Ranch", "plant state": "TX", "plant id": "65975", "generator id": "TXSD2", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65975", "date": "2025-03", "mw": 30}, "first_month": "2023-12", "changes": [{"month": "2024-03", "li": [{"name": "mw", "from": 30, "to": 180, "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-03", "to": "2026-09", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "9", "entity id": "62842", "entity name": "Lightsource Renewable Energy Asset Management, LLC", "plant producer type": "IPP", "plant name": "Starr Solar Ranch", "plant state": "TX", "plant id": "65975", "generator id": "TXSD2", "net summer capacity (mw)": "180", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65975", "date": "2026-09", "mw": 180}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 180, "mwh_is_estimate": true, "mwh": 360, "mwh_estimate": 360, "status": "planning", "status_class": "", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "go_live": "0 ~ 2026-09", "go_live_year_int": 2026, "name": "Starr Solar Ranch", "name_short": "Starr Solar Ranch", "owner": "Lightsource Renewable Energy Asset Management, LLC", "state": "texas", "country": "usa", "lat": "33.39163256713626", "long": "-95.46555141629162", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.39163256713626+-95.46555141629162", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wetzel BESS", "city": "", "id": "1362", "external_id": "67555", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1362", "external_id": "67555", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wetzel BESS", "external_id": "67555", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "RIC Development, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RIC98": {"first": {"year": "2026", "month": "9", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Wetzel BESS", "plant state": "TX", "plant id": "67555", "generator id": "RIC98", "net summer capacity (mw)": "185.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67555", "date": "2026-09", "mw": 185}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "9", "entity id": "66255", "entity name": "RIC Development, LLC", "plant producer type": "IPP", "plant name": "Wetzel BESS", "plant state": "TX", "plant id": "67555", "generator id": "RIC98", "net summer capacity (mw)": "185.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67555", "date": "2026-09", "mw": 185}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": true, "mwh": 370, "mwh_estimate": 370, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "month_disappeared": "", "go_live": "0 ~ 2026-09", "go_live_year_int": 2026, "name": "Wetzel BESS", "name_short": "Wetzel", "owner": "RIC Development, LLC", "state": "texas", "country": "usa", "lat": "33.550450781375964", "long": "-95.1407592129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.550450781375964+-95.1407592129225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "JVR Energy Park LLC", "city": "", "id": "174", "external_id": "64428", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "JVR Energy Park LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "174", "external_id": "64428", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "JVR Energy Park LLC", "external_id": "64428", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "JVR Energy Park LLC", "status": "planning", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"JVR1B": {"first": {"year": "2022", "month": "12", "entity id": "64077", "entity name": "JVR Energy Park LLC", "plant producer type": "IPP", "plant name": "JVR Energy Park LLC", "plant state": "CA", "plant id": "64428", "generator id": "JVR1B", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64428", "date": "2022-12", "mw": 70}, "first_month": "2021-03", "changes": [{"month": "2022-10", "li": [{"name": "date", "from": "2022-12", "to": "2023-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-09", "to": "2026-08", "extra": "delayed by 35 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}]}], "current": {"year": "2026", "month": "8", "entity id": "64077", "entity name": "JVR Energy Park LLC", "plant producer type": "IPP", "plant name": "JVR Energy Park LLC", "plant state": "CA", "plant id": "64428", "generator id": "JVR1B", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64428", "date": "2026-08", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-08", "month_disappeared": "", "go_live": "0 ~ 2026-08", "go_live_year_int": 2026, "name": "JVR Energy Park LLC", "name_short": "JVR Energy Park", "owner": "JVR Energy Park LLC", "state": "california", "country": "usa", "lat": "40.90583611428471", "long": "-121.37050487471748", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.90583611428471+-121.37050487471748", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "OCI Hillsboro", "city": "", "id": "984", "external_id": "66401", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "984", "external_id": "66401", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "OCI Hillsboro", "external_id": "66401", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "OCI Solar Power", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OHLBS": {"first": {"year": "2026", "month": "7", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "OCI Hillsboro", "plant state": "TX", "plant id": "66401", "generator id": "OHLBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66401", "date": "2026-07", "mw": 200}, "first_month": "2023-04", "changes": [], "current": {"year": "2026", "month": "7", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "OCI Hillsboro", "plant state": "TX", "plant id": "66401", "generator id": "OHLBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66401", "date": "2026-07", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-07", "month_disappeared": "", "go_live": "0 ~ 2026-07", "go_live_year_int": 2026, "name": "OCI Hillsboro", "name_short": "OCI Hillsboro", "owner": "OCI Solar Power", "state": "texas", "country": "usa", "lat": "33.689916016041195", "long": "-95.19680178539501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.689916016041195+-95.19680178539501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Swiftsure", "city": "Staten Island", "id": "128", "external_id": "64235", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "650", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.602891", "long": "-74.178441", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, "internal_id": "128", "external_id": "64235", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Swiftsure", "external_id": "64235", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 1300, "power_mw": 650, "owner": "Hecate Grid Swiftsure LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SWFTS": {"first": {"year": "2023", "month": "12", "entity id": "63838", "entity name": "Hecate Grid Swiftsure LLC", "plant producer type": "IPP", "plant name": "Swiftsure", "plant state": "NY", "plant id": "64235", "generator id": "SWFTS", "net summer capacity (mw)": "650", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64235", "date": "2023-12", "mw": 650}, "first_month": "2021-01", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-12", "to": "2025-12", "extra": "delayed by 24 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-12", "to": "2026-06", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "6", "entity id": "63838", "entity name": "Hecate Grid Swiftsure LLC", "plant producer type": "IPP", "plant name": "Swiftsure", "plant state": "NY", "plant id": "64235", "generator id": "SWFTS", "net summer capacity (mw)": "650", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64235", "date": "2026-06", "mw": 650}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 650, "mwh_is_estimate": true, "mwh": 1300, "mwh_estimate": 1300, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Swiftsure", "name_short": "Swiftsure", "owner": "Hecate Grid Swiftsure LLC", "state": "new york", "country": "usa", "lat": "40.602891", "long": "-74.178441", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.602891+-74.178441", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rockmont Solar and Storage Project", "city": "", "id": "225", "external_id": "64216", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "201LC 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "225", "external_id": "64216", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rockmont Solar and Storage Project", "external_id": "64216", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "201LC 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"309SJ": {"first": {"year": "2022", "month": "6", "entity id": "63826", "entity name": "201LC 8me LLC", "plant producer type": "IPP", "plant name": "Rockmont Solar and Storage Project", "plant state": "NM", "plant id": "64216", "generator id": "309SJ", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64216", "date": "2022-06", "mw": 200}, "first_month": "2021-01", "changes": [{"month": "2021-08", "li": [{"name": "mw", "from": 200, "to": 30, "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-06", "to": "2023-06", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2023-06", "to": "2024-04", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-04", "to": "2026-06", "extra": "delayed by 26 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "6", "entity id": "63826", "entity name": "201LC 8me LLC", "plant producer type": "IPP", "plant name": "Rockmont Solar and Storage Project", "plant state": "NM", "plant id": "64216", "generator id": "309SJ", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64216", "date": "2026-06", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Rockmont Solar and Storage Project", "name_short": "Rockmont Solar and Storage", "owner": "201LC 8me LLC", "state": "new mexico", "country": "usa", "lat": "36.599861", "long": "-103.677979", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.599861+-103.677979", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Homestead Energy Storage LLC", "city": "", "id": "623", "external_id": "65398", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "Homestead Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "623", "external_id": "65398", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Homestead Energy Storage LLC", "external_id": "65398", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 28, "power_mw": 14, "owner": "Homestead Energy Storage, LLC", "status": "planning", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HMSD1": {"first": {"year": "2024", "month": "2", "entity id": "64741", "entity name": "Homestead Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Homestead Energy Storage LLC", "plant state": "CA", "plant id": "65398", "generator id": "HMSD1", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65398", "date": "2024-02", "mw": 14}, "first_month": "2022-03", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-02", "to": "2026-06", "extra": "delayed by 28 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "6", "entity id": "64741", "entity name": "Homestead Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Homestead Energy Storage LLC", "plant state": "CA", "plant id": "65398", "generator id": "HMSD1", "net summer capacity (mw)": "14", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65398", "date": "2026-06", "mw": 14}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 14, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "planning", "status_class": "", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Homestead Energy Storage LLC", "name_short": "Homestead Energy Storage", "owner": "Homestead Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.208432801403745", "long": "-121.237743763257", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.208432801403745+-121.237743763257", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eldora Energy LLC", "city": "", "id": "795", "external_id": "65847", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Eldora Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "795", "external_id": "65847", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eldora Energy LLC", "external_id": "65847", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Eldora Energy LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELDBS": {"first": {"year": "2025", "month": "6", "entity id": "65084", "entity name": "Eldora Energy LLC", "plant producer type": "IPP", "plant name": "Eldora Energy LLC", "plant state": "TX", "plant id": "65847", "generator id": "ELDBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65847", "date": "2025-06", "mw": 200}, "first_month": "2022-09", "changes": [{"month": "2024-03", "li": [{"name": "date", "from": "2025-06", "to": "2026-06", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "6", "entity id": "65084", "entity name": "Eldora Energy LLC", "plant producer type": "IPP", "plant name": "Eldora Energy LLC", "plant state": "TX", "plant id": "65847", "generator id": "ELDBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65847", "date": "2026-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Eldora Energy LLC", "name_short": "Eldora Energy", "owner": "Eldora Energy LLC", "state": "texas", "country": "usa", "lat": "33.164054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.164054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Grid Gwent Storage 1", "city": "", "id": "954", "external_id": "66409", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "Hecate Grid Gwent Storage 1, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "954", "external_id": "66409", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Grid Gwent Storage 1", "external_id": "66409", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 270, "power_mw": 135, "owner": "Hecate Grid Gwent Storage 1, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GWNT": {"first": {"year": "2026", "month": "6", "entity id": "65481", "entity name": "Hecate Grid Gwent Storage 1, LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Gwent Storage 1", "plant state": "CA", "plant id": "66409", "generator id": "GWNT", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66409", "date": "2026-06", "mw": 135}, "first_month": "2023-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "65481", "entity name": "Hecate Grid Gwent Storage 1, LLC", "plant producer type": "IPP", "plant name": "Hecate Grid Gwent Storage 1", "plant state": "CA", "plant id": "66409", "generator id": "GWNT", "net summer capacity (mw)": "135", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66409", "date": "2026-06", "mw": 135}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 135, "mwh_is_estimate": true, "mwh": 270, "mwh_estimate": 270, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Hecate Grid Gwent Storage 1", "name_short": "Hecate Grid Gwent Storage 1", "owner": "Hecate Grid Gwent Storage 1, LLC", "state": "california", "country": "usa", "lat": "40.94387837493652", "long": "-121.3581441949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94387837493652+-121.3581441949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elevate Pier S", "city": "", "id": "1038", "external_id": "66787", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Pier S Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1038", "external_id": "66787", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elevate Pier S", "external_id": "66787", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Pier S Energy Storage LLC", "status": "planning", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELVPS": {"first": {"year": "2026", "month": "6", "entity id": "65764", "entity name": "Pier S Energy Storage LLC", "plant producer type": "IPP", "plant name": "Elevate Pier S", "plant state": "CA", "plant id": "66787", "generator id": "ELVPS", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66787", "date": "2026-06", "mw": 70}, "first_month": "2023-08", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "65764", "entity name": "Pier S Energy Storage LLC", "plant producer type": "IPP", "plant name": "Elevate Pier S", "plant state": "CA", "plant id": "66787", "generator id": "ELVPS", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66787", "date": "2026-06", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Elevate Pier S", "name_short": "Elevate Pier S", "owner": "Pier S Energy Storage LLC", "state": "california", "country": "usa", "lat": "40.98395968045898", "long": "-121.10912098932751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98395968045898+-121.10912098932751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lupinus Solar 1, LLC", "city": "", "id": "1060", "external_id": "66895", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "166", "power_mw": "83", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1060", "external_id": "66895", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lupinus Solar 1, LLC", "external_id": "66895", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 166, "power_mw": 83, "owner": "Sunraycer Assets I LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LP1BA": {"first": {"year": "2026", "month": "6", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Lupinus Solar 1, LLC", "plant state": "TX", "plant id": "66895", "generator id": "LP1BA", "net summer capacity (mw)": "83", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66895", "date": "2026-06", "mw": 83}, "first_month": "2023-09", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Lupinus Solar 1, LLC", "plant state": "TX", "plant id": "66895", "generator id": "LP1BA", "net summer capacity (mw)": "83", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66895", "date": "2026-06", "mw": 83}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 83, "mwh_is_estimate": true, "mwh": 166, "mwh_estimate": 166, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Lupinus Solar 1, LLC", "name_short": "Lupinus Solar 1", "owner": "Sunraycer Assets I LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.153438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.153438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Big Fork Solar", "city": "", "id": "1352", "external_id": "62184", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "148", "power_mw": "74", "customer": "", "owner": "Big Fork Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1352", "external_id": "62184", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Big Fork Solar", "external_id": "62184", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 148, "power_mw": 74, "owner": "Big Fork Solar", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"27": {"first": {"year": "2026", "month": "6", "entity id": "61716", "entity name": "Big Fork Solar", "plant producer type": "IPP", "plant name": "Big Fork Solar", "plant state": "SC", "plant id": "62184", "generator id": "27", "net summer capacity (mw)": "74.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62184", "date": "2026-06", "mw": 74}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "61716", "entity name": "Big Fork Solar", "plant producer type": "IPP", "plant name": "Big Fork Solar", "plant state": "SC", "plant id": "62184", "generator id": "27", "net summer capacity (mw)": "74.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62184", "date": "2026-06", "mw": 74}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 74, "mwh_is_estimate": true, "mwh": 148, "mwh_estimate": 148, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Big Fork Solar", "name_short": "Big Fork Solar", "owner": "Big Fork Solar", "state": "south carolina", "country": "usa", "lat": "34.522118923669886", "long": "-79.90876444719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.522118923669886+-79.90876444719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Colleton Solar", "city": "", "id": "1353", "external_id": "62188", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "148", "power_mw": "74", "customer": "", "owner": "Colleton Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1353", "external_id": "62188", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Colleton Solar", "external_id": "62188", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 148, "power_mw": 74, "owner": "Colleton Solar", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"31": {"first": {"year": "2026", "month": "6", "entity id": "61720", "entity name": "Colleton Solar", "plant producer type": "IPP", "plant name": "Colleton Solar", "plant state": "SC", "plant id": "62188", "generator id": "31", "net summer capacity (mw)": "74.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62188", "date": "2026-06", "mw": 74}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "61720", "entity name": "Colleton Solar", "plant producer type": "IPP", "plant name": "Colleton Solar", "plant state": "SC", "plant id": "62188", "generator id": "31", "net summer capacity (mw)": "74.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62188", "date": "2026-06", "mw": 74}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 74, "mwh_is_estimate": true, "mwh": 148, "mwh_estimate": 148, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Colleton Solar", "name_short": "Colleton Solar", "owner": "Colleton Solar", "state": "south carolina", "country": "usa", "lat": "34.47246317893376", "long": "-79.88983835188054", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.47246317893376+-79.88983835188054", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crossroads Solar", "city": "", "id": "1354", "external_id": "62190", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Crossroads Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1354", "external_id": "62190", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Crossroads Solar", "external_id": "62190", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Crossroads Solar", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"33": {"first": {"year": "2026", "month": "6", "entity id": "61722", "entity name": "Crossroads Solar", "plant producer type": "IPP", "plant name": "Crossroads Solar", "plant state": "SC", "plant id": "62190", "generator id": "33", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62190", "date": "2026-06", "mw": 50}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "61722", "entity name": "Crossroads Solar", "plant producer type": "IPP", "plant name": "Crossroads Solar", "plant state": "SC", "plant id": "62190", "generator id": "33", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62190", "date": "2026-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Crossroads Solar", "name_short": "Crossroads Solar", "owner": "Crossroads Solar", "state": "south carolina", "country": "usa", "lat": "34.427961374936515", "long": "-79.8503611949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.427961374936515+-79.8503611949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Quest Solar", "city": "", "id": "1355", "external_id": "62299", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Quest Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1355", "external_id": "62299", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Quest Solar", "external_id": "62299", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Quest Solar", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"67": {"first": {"year": "2026", "month": "6", "entity id": "61807", "entity name": "Quest Solar", "plant producer type": "IPP", "plant name": "Quest Solar", "plant state": "SC", "plant id": "62299", "generator id": "67", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62299", "date": "2026-06", "mw": 50}, "first_month": "2024-04", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "61807", "entity name": "Quest Solar", "plant producer type": "IPP", "plant name": "Quest Solar", "plant state": "SC", "plant id": "62299", "generator id": "67", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62299", "date": "2026-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Quest Solar", "name_short": "Quest Solar", "owner": "Quest Solar", "state": "south carolina", "country": "usa", "lat": "34.39676", "long": "-79.792266", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.39676+-79.792266", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alina Energy LLC", "city": "", "id": "1358", "external_id": "67250", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Alina Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1358", "external_id": "67250", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alina Energy LLC", "external_id": "67250", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Alina Energy LLC", "status": "planning", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ALIBS": {"first": {"year": "2026", "month": "6", "entity id": "66122", "entity name": "Alina Energy LLC", "plant producer type": "IPP", "plant name": "Alina Energy LLC", "plant state": "TX", "plant id": "67250", "generator id": "ALIBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67250", "date": "2026-06", "mw": 200}, "first_month": "2024-03", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "66122", "entity name": "Alina Energy LLC", "plant producer type": "IPP", "plant name": "Alina Energy LLC", "plant state": "TX", "plant id": "67250", "generator id": "ALIBS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67250", "date": "2026-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Alina Energy LLC", "name_short": "Alina Energy", "owner": "Alina Energy LLC", "state": "texas", "country": "usa", "lat": "33.291825270367276", "long": "-95.05014930955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.291825270367276+-95.05014930955251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elm Flats Solar", "city": "", "id": "1369", "external_id": "67552", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Birch Creek Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1369", "external_id": "67552", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elm Flats Solar", "external_id": "67552", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Birch Creek Development", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELMBA": {"first": {"year": "2026", "month": "6", "entity id": "65654", "entity name": "Birch Creek Development", "plant producer type": "IPP", "plant name": "Elm Flats Solar", "plant state": "TX", "plant id": "67552", "generator id": "ELMBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67552", "date": "2026-06", "mw": 50}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "65654", "entity name": "Birch Creek Development", "plant producer type": "IPP", "plant name": "Elm Flats Solar", "plant state": "TX", "plant id": "67552", "generator id": "ELMBA", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67552", "date": "2026-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Elm Flats Solar", "name_short": "Elm Flats Solar", "owner": "Birch Creek Development", "state": "texas", "country": "usa", "lat": "33.552321404211234", "long": "-95.57587397218185", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.552321404211234+-95.57587397218185", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cedar Hill ESS", "city": "", "id": "1370", "external_id": "67570", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Cedar Hill ESS Assets, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1370", "external_id": "67570", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cedar Hill ESS", "external_id": "67570", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Cedar Hill ESS Assets, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"3004": {"first": {"year": "2026", "month": "6", "entity id": "66272", "entity name": "Cedar Hill ESS Assets, LLC", "plant producer type": "IPP", "plant name": "Cedar Hill ESS", "plant state": "TX", "plant id": "67570", "generator id": "3004", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67570", "date": "2026-06", "mw": 10}, "first_month": "2024-06", "changes": [], "current": {"year": "2026", "month": "6", "entity id": "66272", "entity name": "Cedar Hill ESS Assets, LLC", "plant producer type": "IPP", "plant name": "Cedar Hill ESS", "plant state": "TX", "plant id": "67570", "generator id": "3004", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67570", "date": "2026-06", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "month_disappeared": "", "go_live": "0 ~ 2026-06", "go_live_year_int": 2026, "name": "Cedar Hill ESS", "name_short": "Cedar Hill ESS", "owner": "Cedar Hill ESS Assets, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.413438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.413438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alfred Oaks Solar, LLC", "city": "", "id": "1026", "external_id": "66675", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Alfred Oaks Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1026", "external_id": "66675", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alfred Oaks Solar, LLC", "external_id": "66675", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Alfred Oaks Solar, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BA": {"first": {"year": "2026", "month": "5", "entity id": "65689", "entity name": "Alfred Oaks Solar, LLC", "plant producer type": "IPP", "plant name": "Alfred Oaks Solar, LLC", "plant state": "NY", "plant id": "66675", "generator id": "BA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66675", "date": "2026-05", "mw": 20}, "first_month": "2023-07", "changes": [], "current": {"year": "2026", "month": "5", "entity id": "65689", "entity name": "Alfred Oaks Solar, LLC", "plant producer type": "IPP", "plant name": "Alfred Oaks Solar, LLC", "plant state": "NY", "plant id": "66675", "generator id": "BA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66675", "date": "2026-05", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "month_disappeared": "", "go_live": "0 ~ 2026-05", "go_live_year_int": 2026, "name": "Alfred Oaks Solar, LLC", "name_short": "Alfred Oaks Solar", "owner": "Alfred Oaks Solar, LLC", "state": "new york", "country": "usa", "lat": "42.815588720802765", "long": "-75.55669092303249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.815588720802765+-75.55669092303249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Green River Energy Center - Hybrid", "city": "", "id": "1371", "external_id": "67501", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Green River Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1371", "external_id": "67501", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Green River Energy Center - Hybrid", "external_id": "67501", "state": "utah", "country": "usa", "mwh": 0, "estimate_mwh": 800, "power_mw": 400, "owner": "Green River Energy Center, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GRBS": {"first": {"year": "2026", "month": "5", "entity id": "66232", "entity name": "Green River Energy Center, LLC", "plant producer type": "IPP", "plant name": "Green River Energy Center - Hybrid", "plant state": "UT", "plant id": "67501", "generator id": "GRBS", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67501", "date": "2026-05", "mw": 400}, "first_month": "2024-05", "changes": [], "current": {"year": "2026", "month": "5", "entity id": "66232", "entity name": "Green River Energy Center, LLC", "plant producer type": "IPP", "plant name": "Green River Energy Center - Hybrid", "plant state": "UT", "plant id": "67501", "generator id": "GRBS", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67501", "date": "2026-05", "mw": 400}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 400, "mwh_is_estimate": true, "mwh": 800, "mwh_estimate": 800, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "month_disappeared": "", "go_live": "0 ~ 2026-05", "go_live_year_int": 2026, "name": "Green River Energy Center - Hybrid", "name_short": "Green River Energy Center", "owner": "Green River Energy Center, LLC", "state": "utah", "country": "usa", "lat": "40.646842246911255", "long": "-109.85196215563981", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.646842246911255+-109.85196215563981", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wolf Pit Branch Solar, LLC", "city": "", "id": "626", "external_id": "65437", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Wolf Pit Branch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "626", "external_id": "65437", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wolf Pit Branch Solar, LLC", "external_id": "65437", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Wolf Pit Branch Solar, LLC", "status": "planning", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PGB38": {"first": {"year": "2023", "month": "11", "entity id": "64776", "entity name": "Wolf Pit Branch Solar, LLC", "plant producer type": "IPP", "plant name": "Wolf Pit Branch Solar, LLC", "plant state": "SC", "plant id": "65437", "generator id": "PGB38", "net summer capacity (mw)": "15.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65437", "date": "2023-11", "mw": 15}, "first_month": "2022-03", "changes": [{"month": "2023-02", "li": [{"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-11", "to": "2026-04", "extra": "delayed by 29 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "4", "entity id": "64776", "entity name": "Wolf Pit Branch Solar, LLC", "plant producer type": "IPP", "plant name": "Wolf Pit Branch Solar, LLC", "plant state": "SC", "plant id": "65437", "generator id": "PGB38", "net summer capacity (mw)": "15.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65437", "date": "2026-04", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-04", "month_disappeared": "", "go_live": "0 ~ 2026-04", "go_live_year_int": 2026, "name": "Wolf Pit Branch Solar, LLC", "name_short": "Wolf Pit Branch Solar", "owner": "Wolf Pit Branch Solar, LLC", "state": "south carolina", "country": "usa", "lat": "34.77034172080277", "long": "-79.84541692303249", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.77034172080277+-79.84541692303249", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "NISA Electric Generation Project", "city": "", "id": "233", "external_id": "61331", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "NYC ENERGY LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "233", "external_id": "61331", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "NISA Electric Generation Project", "external_id": "61331", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 598, "power_mw": 299, "owner": "NYC Energy LLC", "status": "planning", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"BA1": {"first": {"year": "2023", "month": "11", "entity id": "60971", "entity name": "NYC ENERGY LLC", "plant producer type": "IPP", "plant name": "NISA Electric Generation Project", "plant state": "NY", "plant id": "61331", "generator id": "BA1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61331", "date": "2023-11", "mw": 300}, "first_month": "2021-03", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-11", "to": "2024-03", "extra": "delayed by 4 months", "change_type": "timing"}, {"name": "mw", "from": 300, "to": 79, "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "entity name", "from": "NYC ENERGY LLC", "to": "NYC Energy LLC", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2026-03", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "3", "entity id": "60971", "entity name": "NYC Energy LLC", "plant producer type": "IPP", "plant name": "NISA Electric Generation Project", "plant state": "NY", "plant id": "61331", "generator id": "BA1", "net summer capacity (mw)": "79.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61331", "date": "2026-03", "mw": 79}, "current_month": "2024-06", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}, "BA2": {"first": {"year": "2025", "month": "7", "entity id": "60971", "entity name": "NYC ENERGY LLC", "plant producer type": "IPP", "plant name": "NISA Electric Generation Project", "plant state": "NY", "plant id": "61331", "generator id": "BA2", "net summer capacity (mw)": "220.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61331", "date": "2025-07", "mw": 220}, "first_month": "2022-03", "changes": [{"month": "2023-05", "li": [{"name": "entity name", "from": "NYC ENERGY LLC", "to": "NYC Energy LLC", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-07", "to": "2026-03", "extra": "delayed by 8 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "3", "entity id": "60971", "entity name": "NYC Energy LLC", "plant producer type": "IPP", "plant name": "NISA Electric Generation Project", "plant state": "NY", "plant id": "61331", "generator id": "BA2", "net summer capacity (mw)": "220.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61331", "date": "2026-03", "mw": 220}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 299, "mwh_is_estimate": true, "mwh": 598, "mwh_estimate": 598, "status": "planning", "status_class": "", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "go_live": "0 ~ 2026-03", "go_live_year_int": 2026, "name": "NISA Electric Generation Project", "name_short": "NISA Electric Generation", "owner": "NYC Energy LLC", "state": "new york", "country": "usa", "lat": "42.55007085870876", "long": "-75.57760094178886", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.55007085870876+-75.57760094178886", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KCE NY 10, LLC", "city": "", "id": "1025", "external_id": "66682", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1025", "external_id": "66682", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KCE NY 10, LLC", "external_id": "66682", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NY10": {"first": {"year": "2025", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE NY 10, LLC", "plant state": "NY", "plant id": "66682", "generator id": "NY10", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66682", "date": "2025-12", "mw": 20}, "first_month": "2023-07", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2025-12", "to": "2026-03", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "3", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE NY 10, LLC", "plant state": "NY", "plant id": "66682", "generator id": "NY10", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66682", "date": "2026-03", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "go_live": "0 ~ 2026-03", "go_live_year_int": 2026, "name": "KCE NY 10, LLC", "name_short": "KCE NY 10", "owner": "Key Capture Energy", "state": "new york", "country": "usa", "lat": "42.802006999999996", "long": "-75.50354", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.802006999999996+-75.50354", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KCE NY 29, LLC", "city": "", "id": "1051", "external_id": "66862", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1051", "external_id": "66862", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KCE NY 29, LLC", "external_id": "66862", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NY29": {"first": {"year": "2025", "month": "12", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE NY 29, LLC", "plant state": "NY", "plant id": "66862", "generator id": "NY29", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66862", "date": "2025-12", "mw": 150}, "first_month": "2023-09", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2025-12", "to": "2026-03", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "3", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE NY 29, LLC", "plant state": "NY", "plant id": "66862", "generator id": "NY29", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66862", "date": "2026-03", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-03", "month_disappeared": "", "go_live": "0 ~ 2026-03", "go_live_year_int": 2026, "name": "KCE NY 29, LLC", "name_short": "KCE NY 29", "owner": "Key Capture Energy", "state": "new york", "country": "usa", "lat": "42.614306926686254", "long": "-75.619568894988", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.614306926686254+-75.619568894988", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middlebrook Creek Solar and BESS", "city": "", "id": "790", "external_id": "65853", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "604", "power_mw": "302", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.598849", "long": "-94.598401", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, "internal_id": "790", "external_id": "65853", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Middlebrook Creek Solar and BESS", "external_id": "65853", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 604, "power_mw": 302, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-02", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MIDBS": {"first": {"year": "2024", "month": "10", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Middlebrook Creek Solar and BESS", "plant state": "TX", "plant id": "65853", "generator id": "MIDBS", "net summer capacity (mw)": "302.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65853", "date": "2024-10", "mw": 302}, "first_month": "2022-09", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-10", "to": "2026-02", "extra": "delayed by 16 months", "change_type": "timing"}]}], "current": {"year": "2026", "month": "2", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Middlebrook Creek Solar and BESS", "plant state": "TX", "plant id": "65853", "generator id": "MIDBS", "net summer capacity (mw)": "302.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65853", "date": "2026-02", "mw": 302}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 302, "mwh_is_estimate": true, "mwh": 604, "mwh_estimate": 604, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-02", "month_disappeared": "", "go_live": "0 ~ 2026-02", "go_live_year_int": 2026, "name": "Middlebrook Creek Solar and BESS", "name_short": "Middlebrook Creek Solar", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "31.598849", "long": "-94.598401", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.598849+-94.598401", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarproponent.com/projects/#"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KCE TX 14: Venus Mill Storage", "city": "", "id": "797", "external_id": "65788", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "797", "external_id": "65788", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX 14 Venus Mill Storage", "external_id": "65788", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Key Capture Energy", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX14": {"first": {"year": "2024", "month": "7", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "KCE TX 14: Venus Mill Storage", "plant state": "TX", "plant id": "65788", "generator id": "TX14", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65788", "date": "2024-07", "mw": 100}, "first_month": "2022-09", "changes": [{"month": "2023-07", "li": [{"name": "plant name", "from": "KCE TX 14: Venus Mill Storage", "to": "TX 14 Venus Mill Storage", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-07", "to": "2025-12", "extra": "delayed by 17 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2025-12", "to": "2026-01", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2026", "month": "1", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX 14 Venus Mill Storage", "plant state": "TX", "plant id": "65788", "generator id": "TX14", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65788", "date": "2026-01", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2026-01", "month_disappeared": "", "go_live": "0 ~ 2026-01", "go_live_year_int": 2026, "name": "TX 14 Venus Mill Storage", "name_short": "TX 14 Venus Mill", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.183842323878764", "long": "-95.07711772573431", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.183842323878764+-95.07711772573431", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Marsh Road - Battery Energy Storage System", "city": "", "id": "604", "external_id": "10173", "state": "east midlands", "country": "uk", "capacity_mwh": "1100", "estimate_mwh": "", "power_mw": "550", "customer": "", "owner": "Spalding Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-28", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.great.gov.uk/international/content/investment/opportunities/spalding-battery-energy-storage-system-in-lincolnshire/", "link2": "", "link3": "", "link4": ""}, "internal_id": "604", "external_id": "10173", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Spalding Energy Park - Battery Storage", "external_id": "10173", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 550, "power_mw": 550, "owner": "Intergen Limited", "status": "planning", "date_first_heard": "2023-06-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.803869", "long": "-0.135314", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10173", "Record Last Updated (dd/mm/yyyy)": "28/12/2021", "Operator (or Applicant)": "Spalding Energy Park Limited", "Site Name": "West Marsh Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "550.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Spalding Power Station West Marsh Road Spalding", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE11 2BB", "X-coordinate": "525801", "Y-coordinate": "324553", "Planning Authority": "South Holland District Council", "Planning Application Reference": "H16-1327-21", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.803869", "long": "-0.135314", "status": "planning", "mw": 550, "ext_id": "10173"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Operator (or Applicant)", "from": "Spalding Energy Park Limited", "to": "Intergen Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "West Marsh Road - Battery Energy Storage System", "to": "Spalding Energy Park - Battery Storage", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/12/2021", "to": "12/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "14/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "14/06/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/07/2023", "to": "28/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10173", "Record Last Updated (dd/mm/yyyy)": "28/12/2021", "Operator (or Applicant)": "Intergen Limited", "Site Name": "Spalding Energy Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "550", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Spalding Power Station West Marsh Road Spalding", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE11 2BB", "X-coordinate": "525801", "Y-coordinate": "324553", "Planning Authority": "South Holland District Council", "Planning Application Reference": "H16-1327-21", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/06/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.803869", "long": "-0.135314", "status": "planning", "mw": 550, "ext_id": "10173"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 550, "mwh_is_estimate": false, "mwh": 1100, "mwh_estimate": 550, "status": "planning", "status_class": "", "date_first_heard": "2023-06-14", "start_construction": "", "start_operation": "", "start_estimated": "2026", "month_disappeared": "", "go_live": "0 ~ 2026", "go_live_year_int": 2026, "name": "Spalding Energy Park - Battery Storage", "name_short": "Spalding Energy Park", "owner": "Intergen Limited", "state": "east midlands", "country": "uk", "lat": "52.803869", "long": "-0.135314", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.803869+-0.135314", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.great.gov.uk/international/content/investment/opportunities/spalding-battery-energy-storage-system-in-lincolnshire/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Orana BESS", "city": "wellington", "id": "1395", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1660", "estimate_mwh": "", "power_mw": "415", "customer": "EnergyAustralia", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "650", "cost_currency": "AUD", "cost_incl_solar": "0", "lat": "-32.527608", "long": "148.958942", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1812687836887281794", "link2": "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million", "link3": "", "link4": ""}, "internal_id": "1395", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 415, "mwh_is_estimate": false, "mwh": 1660, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "month_disappeared": "", "go_live": "0 ~ 2026", "go_live_year_int": 2026, "name": "Orana BESS", "name_short": "Orana", "owner": "Akaysha Energy", "state": "new south wales", "country": "australia", "lat": "-32.527608", "long": "148.958942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-32.527608+148.958942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://x.com/SawyerMerritt/status/1812687836887281794", "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Collie Battery Stage 2", "city": "", "id": "1394", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "1363", "estimate_mwh": "", "power_mw": "341", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31", "long": "116.29", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://colliebattery.com.au/2024/05/01/construction-stage2/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1394", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 341, "mwh_is_estimate": false, "mwh": 1363, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "month_disappeared": "", "go_live": "0 ~ 2025Q4", "go_live_year_int": 2025, "name": "Collie Battery Stage 2", "name_short": "Collie Battery Stage 2", "owner": "neoen", "state": "western australia", "country": "australia", "lat": "-33.31", "long": "116.29", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.31+116.29", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 224, "notes_split": [""], "links": ["https://colliebattery.com.au/2024/05/01/construction-stage2/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Limondale", "city": "balranald", "id": "1396", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "RWE", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.774873", "long": "143.526866", "coords_hint": "2", "use_case": "", "notes": "location from the balrnald supstation on google maps", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1795348622864945179", "link2": "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/", "link3": "", "link4": ""}, "internal_id": "1396", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "month_disappeared": "", "go_live": "0 ~ 2025Q4", "go_live_year_int": 2025, "name": "Limondale", "name_short": "Limondale", "owner": "RWE", "state": "new south wales", "country": "australia", "lat": "-34.774873", "long": "143.526866", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.774873+143.526866", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from the balrnald supstation on google maps"], "links": ["https://x.com/SawyerMerritt/status/1795348622864945179", "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Western Downs Battery", "city": "South West Queensland", "id": "850", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "270", "customer": "Neoen Australia", "owner": "Neoen", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-26.976142", "long": "150.666771", "coords_hint": "2", "use_case": "solar farm support", "notes": "", "project_website": "https://westerndownsgreenpowerhub.com.au/", "link1": "https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "link2": "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/", "link3": "", "link4": ""}, "internal_id": "850", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 270, "mwh_is_estimate": false, "mwh": 540, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "month_disappeared": "", "go_live": "0 ~ 2025Q1", "go_live_year_int": 2025, "name": "Western Downs Battery", "name_short": "Western Downs Battery", "owner": "Neoen", "state": "queensland", "country": "australia", "lat": "-26.976142", "long": "150.666771", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-26.976142+150.666771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bellefield Solar and Energy Storage Farm", "city": "", "id": "158", "external_id": "64210", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "50LW 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "158", "external_id": "64210", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bellefield Solar and Energy Storage Farm", "external_id": "64210", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 1000, "power_mw": 500, "owner": "50LW 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"50LWB": {"first": {"year": "2023", "month": "6", "entity id": "63805", "entity name": "50LW 8me LLC", "plant producer type": "IPP", "plant name": "Bellefield Solar and Energy Storage Farm", "plant state": "CA", "plant id": "64210", "generator id": "50LWB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64210", "date": "2023-06", "mw": 500}, "first_month": "2021-01", "changes": [{"month": "2022-02", "li": [{"name": "date", "from": "2023-06", "to": "2024-11", "extra": "delayed by 17 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2024-11", "to": "2025-12", "extra": "delayed by 13 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "63805", "entity name": "50LW 8me LLC", "plant producer type": "IPP", "plant name": "Bellefield Solar and Energy Storage Farm", "plant state": "CA", "plant id": "64210", "generator id": "50LWB", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64210", "date": "2025-12", "mw": 500}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 500, "mwh_is_estimate": true, "mwh": 1000, "mwh_estimate": 1000, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Bellefield Solar and Energy Storage Farm", "name_short": "Bellefield Solar and Energy Storage...", "owner": "50LW 8me LLC", "state": "california", "country": "usa", "lat": "40.96044827036728", "long": "-121.07676030955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.96044827036728+-121.07676030955251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Skeleton Creek Energy Center Hybrid", "city": "", "id": "237", "external_id": "62494", "state": "oklahoma", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Skeleton Creek Energy Center", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "237", "external_id": "62494", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Skeleton Creek Energy Center Hybrid", "external_id": "62494", "state": "oklahoma", "country": "usa", "mwh": 0, "estimate_mwh": 504, "power_mw": 252, "owner": "Skeleton Creek Energy Center", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SCBAT": {"first": {"year": "2023", "month": "12", "entity id": "62023", "entity name": "Skeleton Creek Energy Center", "plant producer type": "IPP", "plant name": "Skeleton Creek Energy Center Hybrid", "plant state": "OK", "plant id": "62494", "generator id": "SCBAT", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62494", "date": "2023-12", "mw": 200}, "first_month": "2020-09", "changes": [{"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2025-12", "extra": "delayed by 24 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "mw", "from": 200, "to": 252, "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "12", "entity id": "62023", "entity name": "Skeleton Creek Energy Center", "plant producer type": "IPP", "plant name": "Skeleton Creek Energy Center Hybrid", "plant state": "OK", "plant id": "62494", "generator id": "SCBAT", "net summer capacity (mw)": "252", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62494", "date": "2025-12", "mw": 252}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 252, "mwh_is_estimate": true, "mwh": 504, "mwh_estimate": 504, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Skeleton Creek Energy Center Hybrid", "name_short": "Skeleton Creek Energy Center", "owner": "Skeleton Creek Energy Center", "state": "oklahoma", "country": "usa", "lat": "36.52377636320376", "long": "-95.09821295600942", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.52377636320376+-95.09821295600942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Boulder Solar III LLC", "city": "", "id": "577", "external_id": "65141", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "116", "power_mw": "58", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "577", "external_id": "65141", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Boulder Solar III LLC", "external_id": "65141", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 116, "power_mw": 58, "owner": "174 Power Global Corp.", "status": "planning", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BS3ES": {"first": {"year": "2023", "month": "12", "entity id": "61222", "entity name": "174 Power Global Corp.", "plant producer type": "IPP", "plant name": "Boulder Solar III LLC", "plant state": "NV", "plant id": "65141", "generator id": "BS3ES", "net summer capacity (mw)": "58", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65141", "date": "2023-12", "mw": 58}, "first_month": "2021-12", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2023-12", "to": "2025-12", "extra": "delayed by 24 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "61222", "entity name": "174 Power Global Corp.", "plant producer type": "IPP", "plant name": "Boulder Solar III LLC", "plant state": "NV", "plant id": "65141", "generator id": "BS3ES", "net summer capacity (mw)": "58", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65141", "date": "2025-12", "mw": 58}, "current_month": "2024-06", "dates": {"first_heard": "2021-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 58, "mwh_is_estimate": true, "mwh": 116, "mwh_estimate": 116, "status": "planning", "status_class": "", "date_first_heard": "2021-12", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Boulder Solar III LLC", "name_short": "Boulder Solar III", "owner": "174 Power Global Corp.", "state": "nevada", "country": "usa", "lat": "41.30554500365377", "long": "-114.73319713582602", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.30554500365377+-114.73319713582602", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chiquito Grid, LLC", "city": "", "id": "705", "external_id": "65655", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Chiquito Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "705", "external_id": "65655", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Chiquito Grid, LLC", "external_id": "65655", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "Chiquito Grid, LLC", "status": "planning", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HECHQ": {"first": {"year": "2023", "month": "3", "entity id": "64934", "entity name": "Chiquito Grid, LLC", "plant producer type": "IPP", "plant name": "Chiquito Grid, LLC", "plant state": "CA", "plant id": "65655", "generator id": "HECHQ", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65655", "date": "2023-03", "mw": 80}, "first_month": "2022-06", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2023-03", "to": "2023-12", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "64934", "entity name": "Chiquito Grid, LLC", "plant producer type": "IPP", "plant name": "Chiquito Grid, LLC", "plant state": "CA", "plant id": "65655", "generator id": "HECHQ", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65655", "date": "2025-12", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2022-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "planning", "status_class": "", "date_first_heard": "2022-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Chiquito Grid, LLC", "name_short": "Chiquito Grid", "owner": "Chiquito Grid, LLC", "state": "california", "country": "usa", "lat": "41.232677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.232677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clear Fork Creek Solar and BESS SLF", "city": "", "id": "784", "external_id": "65842", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1200", "power_mw": "600", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "784", "external_id": "65842", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Clear Fork Creek Solar and BESS SLF", "external_id": "65842", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 1200, "power_mw": 600, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CFCBS": {"first": {"year": "2024", "month": "3", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Clear Fork Creek Solar and BESS SLF", "plant state": "TX", "plant id": "65842", "generator id": "CFCBS", "net summer capacity (mw)": "600", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65842", "date": "2024-03", "mw": 600}, "first_month": "2022-09", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2024-03", "to": "2025-12", "extra": "delayed by 21 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Clear Fork Creek Solar and BESS SLF", "plant state": "TX", "plant id": "65842", "generator id": "CFCBS", "net summer capacity (mw)": "600", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65842", "date": "2025-12", "mw": 600}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 600, "mwh_is_estimate": true, "mwh": 1200, "mwh_estimate": 1200, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Clear Fork Creek Solar and BESS SLF", "name_short": "Clear Fork Creek Solar and BESS SLF", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "33.689916016041195", "long": "-95.19680178539501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.689916016041195+-95.19680178539501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hollow Branch Creek 2 Solar and BESS SLF", "city": "", "id": "786", "external_id": "65851", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "786", "external_id": "65851", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hollow Branch Creek 2 Solar and BESS SLF", "external_id": "65851", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 800, "power_mw": 400, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HB2BS": {"first": {"year": "2024", "month": "10", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Hollow Branch Creek 2 Solar and BESS SLF", "plant state": "TX", "plant id": "65851", "generator id": "HB2BS", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65851", "date": "2024-10", "mw": 400}, "first_month": "2022-09", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-10", "to": "2025-12", "extra": "delayed by 14 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Hollow Branch Creek 2 Solar and BESS SLF", "plant state": "TX", "plant id": "65851", "generator id": "HB2BS", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65851", "date": "2025-12", "mw": 400}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 400, "mwh_is_estimate": true, "mwh": 800, "mwh_estimate": 800, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Hollow Branch Creek 2 Solar and BESS SLF", "name_short": "Hollow Branch Creek 2 Solar and BES...", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "33.73176250275819", "long": "-95.36367096235749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.73176250275819+-95.36367096235749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barilla Solar", "city": "", "id": "943", "external_id": "58710", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "943", "external_id": "58710", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Barilla Solar", "external_id": "58710", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BARBA": {"first": {"year": "2025", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Barilla Solar", "plant state": "TX", "plant id": "58710", "generator id": "BARBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58710", "date": "2025-12", "mw": 20}, "first_month": "2023-02", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Barilla Solar", "plant state": "TX", "plant id": "58710", "generator id": "BARBA", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58710", "date": "2025-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Barilla Solar", "name_short": "Barilla Solar", "owner": "Leeward Asset Management, LLC", "state": "texas", "country": "usa", "lat": "33.572170481178745", "long": "-95.1876213531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.572170481178745+-95.1876213531653", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Energy Ramsey Storage", "city": "", "id": "978", "external_id": "66414", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "Hecate Energy Ramsey Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "978", "external_id": "66414", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Energy Ramsey Storage", "external_id": "66414", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 1000, "power_mw": 500, "owner": "Hecate Energy Ramsey Storage, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RMSY": {"first": {"year": "2024", "month": "6", "entity id": "65483", "entity name": "Hecate Energy Ramsey Storage, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Ramsey Storage", "plant state": "TX", "plant id": "66414", "generator id": "RMSY", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66414", "date": "2024-06", "mw": 500}, "first_month": "2023-04", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-12", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65483", "entity name": "Hecate Energy Ramsey Storage, LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Ramsey Storage", "plant state": "TX", "plant id": "66414", "generator id": "RMSY", "net summer capacity (mw)": "500", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66414", "date": "2025-12", "mw": 500}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 500, "mwh_is_estimate": true, "mwh": 1000, "mwh_estimate": 1000, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Hecate Energy Ramsey Storage", "name_short": "Hecate Energy Ramsey", "owner": "Hecate Energy Ramsey Storage, LLC", "state": "texas", "country": "usa", "lat": "33.268313860275576", "long": "-95.01778862977751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.268313860275576+-95.01778862977751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Grid East Valley Storage", "city": "", "id": "982", "external_id": "66411", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "510", "power_mw": "255", "customer": "", "owner": "Hecate Grid East Valley Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "982", "external_id": "66411", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Grid East Valley Storage", "external_id": "66411", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 510, "power_mw": 255, "owner": "Hecate Grid East Valley Storage, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RMSY": {"first": {"year": "2024", "month": "6", "entity id": "65485", "entity name": "Hecate Grid East Valley Storage, LLC", "plant producer type": "IPP", "plant name": "Hecate Grid East Valley Storage", "plant state": "TX", "plant id": "66411", "generator id": "RMSY", "net summer capacity (mw)": "255", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66411", "date": "2024-06", "mw": 255}, "first_month": "2023-04", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-12", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65485", "entity name": "Hecate Grid East Valley Storage, LLC", "plant producer type": "IPP", "plant name": "Hecate Grid East Valley Storage", "plant state": "TX", "plant id": "66411", "generator id": "RMSY", "net summer capacity (mw)": "255", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66411", "date": "2025-12", "mw": 255}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 255, "mwh_is_estimate": true, "mwh": 510, "mwh_estimate": 510, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Hecate Grid East Valley Storage", "name_short": "Hecate Grid East Valley", "owner": "Hecate Grid East Valley Storage, LLC", "state": "texas", "country": "usa", "lat": "33.573962191467665", "long": "-95.10839853314751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.573962191467665+-95.10839853314751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 7 BESS 1", "city": "", "id": "985", "external_id": "66297", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "985", "external_id": "66297", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 7 BESS 1", "external_id": "66297", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A7BS1": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 7 BESS 1", "plant state": "TX", "plant id": "66297", "generator id": "A7BS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66297", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2025-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 7 BESS 1", "plant state": "TX", "plant id": "66297", "generator id": "A7BS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66297", "date": "2025-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Alamo 7 BESS 1", "name_short": "Alamo 7 BESS 1", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.724054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.724054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 7 BESS 2", "city": "", "id": "986", "external_id": "66298", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "986", "external_id": "66298", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 7 BESS 2", "external_id": "66298", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A7BS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 7 BESS 2", "plant state": "TX", "plant id": "66298", "generator id": "A7BS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66298", "date": "2024-05", "mw": 150}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2025-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 7 BESS 2", "plant state": "TX", "plant id": "66298", "generator id": "A7BS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66298", "date": "2025-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Alamo 7 BESS 2", "name_short": "Alamo 7 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.73176250275819", "long": "-95.36367096235749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.73176250275819+-95.36367096235749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gaia Hybrid", "city": "", "id": "1000", "external_id": "66342", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "152", "power_mw": "76", "customer": "", "owner": "Samsung Solar Energy 2, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1000", "external_id": "66342", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gaia Hybrid", "external_id": "66342", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 152, "power_mw": 76, "owner": "Samsung C&T Renewables, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GAIAB": {"first": {"year": "2025", "month": "12", "entity id": "65144", "entity name": "Samsung Solar Energy 2, LLC", "plant producer type": "IPP", "plant name": "Gaia Hybrid", "plant state": "TX", "plant id": "66342", "generator id": "GAIAB", "net summer capacity (mw)": "76.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66342", "date": "2025-12", "mw": 76}, "first_month": "2023-03", "changes": [{"month": "2023-12", "li": [{"name": "entity name", "from": "Samsung Solar Energy 2, LLC", "to": "Samsung C&T Renewables, LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "12", "entity id": "65144", "entity name": "Samsung C&T Renewables, LLC", "plant producer type": "IPP", "plant name": "Gaia Hybrid", "plant state": "TX", "plant id": "66342", "generator id": "GAIAB", "net summer capacity (mw)": "76.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66342", "date": "2025-12", "mw": 76}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 76, "mwh_is_estimate": true, "mwh": 152, "mwh_estimate": 152, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Gaia Hybrid", "name_short": "Gaia", "owner": "Samsung C&T Renewables, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eagle Springs Hybrid", "city": "", "id": "1002", "external_id": "66341", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Samsung Solar Energy 2, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1002", "external_id": "66341", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eagle Springs Hybrid", "external_id": "66341", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 122, "power_mw": 61, "owner": "Samsung C&T Renewables, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"EGSB": {"first": {"year": "2025", "month": "12", "entity id": "65144", "entity name": "Samsung Solar Energy 2, LLC", "plant producer type": "IPP", "plant name": "Eagle Springs Hybrid", "plant state": "TX", "plant id": "66341", "generator id": "EGSB", "net summer capacity (mw)": "61.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66341", "date": "2025-12", "mw": 61}, "first_month": "2023-03", "changes": [{"month": "2023-12", "li": [{"name": "entity name", "from": "Samsung Solar Energy 2, LLC", "to": "Samsung C&T Renewables, LLC", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "12", "entity id": "65144", "entity name": "Samsung C&T Renewables, LLC", "plant producer type": "IPP", "plant name": "Eagle Springs Hybrid", "plant state": "TX", "plant id": "66341", "generator id": "EGSB", "net summer capacity (mw)": "61.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66341", "date": "2025-12", "mw": 61}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 61, "mwh_is_estimate": true, "mwh": 122, "mwh_estimate": 122, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Eagle Springs Hybrid", "name_short": "Eagle Springs", "owner": "Samsung C&T Renewables, LLC", "state": "texas", "country": "usa", "lat": "33.47991655110087", "long": "-95.2378412522475", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.47991655110087+-95.2378412522475", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Seven Flags BESS LLC", "city": "", "id": "1032", "external_id": "66689", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Seven Flags BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1032", "external_id": "66689", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Seven Flags BESS LLC", "external_id": "66689", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Seven Flags BESS LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"7FLAG": {"first": {"year": "2025", "month": "9", "entity id": "65695", "entity name": "Seven Flags BESS LLC", "plant producer type": "IPP", "plant name": "Seven Flags BESS LLC", "plant state": "TX", "plant id": "66689", "generator id": "7FLAG", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66689", "date": "2025-09", "mw": 100}, "first_month": "2023-07", "changes": [{"month": "2024-02", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(P) Planned for installation, but regulatory approvals not initiated", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-09", "to": "2025-12", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "12", "entity id": "65695", "entity name": "Seven Flags BESS LLC", "plant producer type": "IPP", "plant name": "Seven Flags BESS LLC", "plant state": "TX", "plant id": "66689", "generator id": "7FLAG", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66689", "date": "2025-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Seven Flags BESS LLC", "name_short": "Seven Flags BESS", "owner": "Seven Flags BESS LLC", "state": "texas", "country": "usa", "lat": "33.392924333761584", "long": "-95.357575767415", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.392924333761584+-95.357575767415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Briggs Solar, LLC", "city": "", "id": "1034", "external_id": "66691", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Briggs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1034", "external_id": "66691", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Briggs Solar, LLC", "external_id": "66691", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Briggs Solar, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BRUGG": {"first": {"year": "2025", "month": "12", "entity id": "65697", "entity name": "Briggs Solar, LLC", "plant producer type": "IPP", "plant name": "Briggs Solar, LLC", "plant state": "TX", "plant id": "66691", "generator id": "BRUGG", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66691", "date": "2025-12", "mw": 70}, "first_month": "2023-07", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "65697", "entity name": "Briggs Solar, LLC", "plant producer type": "IPP", "plant name": "Briggs Solar, LLC", "plant state": "TX", "plant id": "66691", "generator id": "BRUGG", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66691", "date": "2025-12", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Briggs Solar, LLC", "name_short": "Briggs Solar", "owner": "Briggs Solar, LLC", "state": "texas", "country": "usa", "lat": "33.31329763558831", "long": "-95.3191725151675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.31329763558831+-95.3191725151675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Iron Belt", "city": "", "id": "1187", "external_id": "67059", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Iron Belt Energy Storage Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1187", "external_id": "67059", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Iron Belt", "external_id": "67059", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 800, "power_mw": 400, "owner": "Iron Belt Energy Storage Project, LLC", "status": "planning", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2025", "month": "12", "entity id": "65967", "entity name": "Iron Belt Energy Storage Project, LLC", "plant producer type": "IPP", "plant name": "Iron Belt", "plant state": "TX", "plant id": "67059", "generator id": "1", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67059", "date": "2025-12", "mw": 400}, "first_month": "2024-01", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "65967", "entity name": "Iron Belt Energy Storage Project, LLC", "plant producer type": "IPP", "plant name": "Iron Belt", "plant state": "TX", "plant id": "67059", "generator id": "1", "net summer capacity (mw)": "400", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67059", "date": "2025-12", "mw": 400}, "current_month": "2024-06", "dates": {"first_heard": "2024-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 400, "mwh_is_estimate": true, "mwh": 800, "mwh_estimate": 800, "status": "planning", "status_class": "", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Iron Belt", "name_short": "Iron Belt", "owner": "Iron Belt Energy Storage Project, LLC", "state": "texas", "country": "usa", "lat": "33.70808533623373", "long": "-95.45800256921983", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.70808533623373+-95.45800256921983", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KRS I Anahola Solar Hybrid", "city": "", "id": "1312", "external_id": "58639", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Kauai Island Utility Cooperative", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1312", "external_id": "58639", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KRS I Anahola Solar Hybrid", "external_id": "58639", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Kauai Island Utility Cooperative", "status": "planning", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS8": {"first": {"year": "2025", "month": "12", "entity id": "10071", "entity name": "Kauai Island Utility Cooperative", "plant producer type": "Electric Utility", "plant name": "KRS I Anahola Solar Hybrid", "plant state": "HI", "plant id": "58639", "generator id": "BESS8", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58639", "date": "2025-12", "mw": 12}, "first_month": "2024-02", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "10071", "entity name": "Kauai Island Utility Cooperative", "plant producer type": "Electric Utility", "plant name": "KRS I Anahola Solar Hybrid", "plant state": "HI", "plant id": "58639", "generator id": "BESS8", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58639", "date": "2025-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "KRS I Anahola Solar Hybrid", "name_short": "KRS I Anahola Solar", "owner": "Kauai Island Utility Cooperative", "state": "hawaii", "country": "usa", "lat": "19.57422674385328", "long": "-155.56531208764", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.57422674385328+-155.56531208764", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "KRS II Koloa Solar", "city": "", "id": "1313", "external_id": "58640", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Kauai Island Utility Cooperative", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1313", "external_id": "58640", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "KRS II Koloa Solar", "external_id": "58640", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Kauai Island Utility Cooperative", "status": "planning", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS7": {"first": {"year": "2025", "month": "12", "entity id": "10071", "entity name": "Kauai Island Utility Cooperative", "plant producer type": "Electric Utility", "plant name": "KRS II Koloa Solar", "plant state": "HI", "plant id": "58640", "generator id": "BESS7", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58640", "date": "2025-12", "mw": 12}, "first_month": "2024-02", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "10071", "entity name": "Kauai Island Utility Cooperative", "plant producer type": "Electric Utility", "plant name": "KRS II Koloa Solar", "plant state": "HI", "plant id": "58640", "generator id": "BESS7", "net summer capacity (mw)": "12", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "58640", "date": "2025-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "KRS II Koloa Solar", "name_short": "KRS II Koloa Solar", "owner": "Kauai Island Utility Cooperative", "state": "hawaii", "country": "usa", "lat": "19.542269538483755", "long": "-155.56408453169715", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.542269538483755+-155.56408453169715", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Azalea (CA)", "city": "", "id": "1338", "external_id": "66890", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Idemitsu Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1338", "external_id": "66890", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Azalea (CA)", "external_id": "66890", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Idemitsu Renewables", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AZAL": {"first": {"year": "2025", "month": "12", "entity id": "63137", "entity name": "Idemitsu Renewables", "plant producer type": "IPP", "plant name": "Azalea (CA)", "plant state": "CA", "plant id": "66890", "generator id": "AZAL", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66890", "date": "2025-12", "mw": 60}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "63137", "entity name": "Idemitsu Renewables", "plant producer type": "IPP", "plant name": "Azalea (CA)", "plant state": "CA", "plant id": "66890", "generator id": "AZAL", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66890", "date": "2025-12", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Azalea (CA)", "name_short": "Azalea (CA)", "owner": "Idemitsu Renewables", "state": "california", "country": "usa", "lat": "40.98395968045898", "long": "-121.10912098932751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98395968045898+-121.10912098932751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bell Creek BESS LLC", "city": "", "id": "1360", "external_id": "67535", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Nexus Renewables U.S. Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1360", "external_id": "67535", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bell Creek BESS LLC", "external_id": "67535", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Nexus Renewables U.S. Inc.", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ASHU1": {"first": {"year": "2025", "month": "12", "entity id": "66234", "entity name": "Nexus Renewables U.S. Inc.", "plant producer type": "IPP", "plant name": "Bell Creek BESS LLC", "plant state": "TX", "plant id": "67535", "generator id": "ASHU1", "net summer capacity (mw)": "200.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67535", "date": "2025-12", "mw": 200}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "12", "entity id": "66234", "entity name": "Nexus Renewables U.S. Inc.", "plant producer type": "IPP", "plant name": "Bell Creek BESS LLC", "plant state": "TX", "plant id": "67535", "generator id": "ASHU1", "net summer capacity (mw)": "200.9", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67535", "date": "2025-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "month_disappeared": "", "go_live": "0 ~ 2025-12", "go_live_year_int": 2025, "name": "Bell Creek BESS LLC", "name_short": "Bell Creek BESS", "owner": "Nexus Renewables U.S. Inc.", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.153438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.153438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aratina Solar Center 1 Hybrid", "city": "", "id": "178", "external_id": "61167", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "91MC 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "178", "external_id": "61167", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Aratina Solar Center 1 Hybrid", "external_id": "61167", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "91MC 8me LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2022", "month": "8", "entity id": "60796", "entity name": "91MC 8me LLC", "plant producer type": "IPP", "plant name": "Aratina Solar Center 1 Hybrid", "plant state": "CA", "plant id": "61167", "generator id": "BESS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61167", "date": "2022-08", "mw": 50}, "first_month": "2020-09", "changes": [{"month": "2021-10", "li": [{"name": "date", "from": "2022-08", "to": "2023-09", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-12", "to": "2025-06", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2025-06", "to": "2025-11", "extra": "delayed by 5 months", "change_type": "timing"}, {"name": "mw", "from": 50, "to": 125, "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "11", "entity id": "60796", "entity name": "91MC 8me LLC", "plant producer type": "IPP", "plant name": "Aratina Solar Center 1 Hybrid", "plant state": "CA", "plant id": "61167", "generator id": "BESS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61167", "date": "2025-11", "mw": 125}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "go_live": "0 ~ 2025-11", "go_live_year_int": 2025, "name": "Aratina Solar Center 1 Hybrid", "name_short": "Aratina Solar Center 1", "owner": "91MC 8me LLC", "state": "california", "country": "usa", "lat": "40.93693686027558", "long": "-121.04439962977752", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.93693686027558+-121.04439962977752", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Parowan Solar", "city": "", "id": "944", "external_id": "65823", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "116", "power_mw": "58", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "944", "external_id": "65823", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Parowan Solar", "external_id": "65823", "state": "utah", "country": "usa", "mwh": 0, "estimate_mwh": 116, "power_mw": 58, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PARB": {"first": {"year": "2024", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Parowan Solar", "plant state": "UT", "plant id": "65823", "generator id": "PARB", "net summer capacity (mw)": "58", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65823", "date": "2024-12", "mw": 58}, "first_month": "2023-02", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2025-11", "extra": "delayed by 11 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "11", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Parowan Solar", "plant state": "UT", "plant id": "65823", "generator id": "PARB", "net summer capacity (mw)": "58", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65823", "date": "2025-11", "mw": 58}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 58, "mwh_is_estimate": true, "mwh": 116, "mwh_estimate": 116, "status": "planning", "status_class": "", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "go_live": "0 ~ 2025-11", "go_live_year_int": 2025, "name": "Parowan Solar", "name_short": "Parowan Solar", "owner": "Leeward Asset Management, LLC", "state": "utah", "country": "usa", "lat": "40.85668049473758", "long": "-109.64597614494501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.85668049473758+-109.64597614494501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Quail Ranch Solar and BESS", "city": "", "id": "1349", "external_id": "67204", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Quail Ranch Solar and Battery Energy Storage System", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1349", "external_id": "67204", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Quail Ranch Solar and BESS", "external_id": "67204", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Quail Ranch Solar and Battery Energy Storage System", "status": "planning", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"QRBES": {"first": {"year": "2025", "month": "11", "entity id": "66087", "entity name": "Quail Ranch Solar and Battery Energy Storage System", "plant producer type": "IPP", "plant name": "Quail Ranch Solar and BESS", "plant state": "NM", "plant id": "67204", "generator id": "QRBES", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67204", "date": "2025-11", "mw": 100}, "first_month": "2024-03", "changes": [], "current": {"year": "2025", "month": "11", "entity id": "66087", "entity name": "Quail Ranch Solar and Battery Energy Storage System", "plant producer type": "IPP", "plant name": "Quail Ranch Solar and BESS", "plant state": "NM", "plant id": "67204", "generator id": "QRBES", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67204", "date": "2025-11", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "month_disappeared": "", "go_live": "0 ~ 2025-11", "go_live_year_int": 2025, "name": "Quail Ranch Solar and BESS", "name_short": "Quail Ranch Solar", "owner": "Quail Ranch Solar and Battery Energy Storage System", "state": "new mexico", "country": "usa", "lat": "36.53576772443623", "long": "-103.94237271153004", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.53576772443623+-103.94237271153004", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Menifee Power Bank", "city": "", "id": "947", "external_id": "66494", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Nova Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "947", "external_id": "66494", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Menifee Power Bank", "external_id": "66494", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 1350, "power_mw": 675, "owner": "Nova Power, LLC", "status": "construction", "date_first_heard": "2023-04", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"NOVA1": {"first": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Menifee Power Bank", "plant producer type": "IPP", "plant name": "Nova Power", "plant state": "CA", "plant id": "66494", "generator id": "NOVA1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66494", "date": "2024-08", "mw": 230}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity name", "from": "Menifee Power Bank", "to": "Nova Power, LLC", "extra": "", "change_type": "misc"}, {"name": "plant name", "from": "Nova Power", "to": "Menifee Power Bank", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2024-08", "to": "2024-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA1", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66494", "date": "2024-06", "mw": 230}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-10"}, "month_disappeared": ""}, "NOVA2": {"first": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Menifee Power Bank", "plant producer type": "IPP", "plant name": "Nova Power", "plant state": "CA", "plant id": "66494", "generator id": "NOVA2", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66494", "date": "2024-08", "mw": 230}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity name", "from": "Menifee Power Bank", "to": "Nova Power, LLC", "extra": "", "change_type": "misc"}, {"name": "plant name", "from": "Nova Power", "to": "Menifee Power Bank", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2024-08", "to": "2024-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA2", "net summer capacity (mw)": "230", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66494", "date": "2024-07", "mw": 230}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-10"}, "month_disappeared": ""}, "NOVA3": {"first": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Menifee Power Bank", "plant producer type": "IPP", "plant name": "Nova Power", "plant state": "CA", "plant id": "66494", "generator id": "NOVA3", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66494", "date": "2024-08", "mw": 50}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity name", "from": "Menifee Power Bank", "to": "Nova Power, LLC", "extra": "", "change_type": "misc"}, {"name": "plant name", "from": "Nova Power", "to": "Menifee Power Bank", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2024-08", "to": "2024-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2024-09", "to": "2024-08", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA3", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66494", "date": "2024-08", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2024-01"}, "month_disappeared": ""}, "NOVA4": {"first": {"year": "2024", "month": "8", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA4", "net summer capacity (mw)": "110", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66494", "date": "2024-08", "mw": 110}, "first_month": "2023-10", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-08", "to": "2024-09", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA4", "net summer capacity (mw)": "110", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66494", "date": "2024-09", "mw": 110}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}, "NOVA5": {"first": {"year": "2025", "month": "10", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA5", "net summer capacity (mw)": "55", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66494", "date": "2025-10", "mw": 55}, "first_month": "2023-12", "changes": [], "current": {"year": "2025", "month": "10", "entity id": "65550", "entity name": "Nova Power, LLC", "plant producer type": "IPP", "plant name": "Menifee Power Bank", "plant state": "CA", "plant id": "66494", "generator id": "NOVA5", "net summer capacity (mw)": "55", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66494", "date": "2025-10", "mw": 55}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 675, "mwh_is_estimate": true, "mwh": 1350, "mwh_estimate": 1350, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-04", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "go_live": "0 ~ 2025-10", "go_live_year_int": 2025, "name": "Menifee Power Bank", "name_short": "Menifee Power Bank", "owner": "Nova Power, LLC", "state": "california", "country": "usa", "lat": "41.31198697668374", "long": "-121.43759074903645", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.31198697668374+-121.43759074903645", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Baldy Mesa Solar & Storage", "city": "", "id": "957", "external_id": "66598", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "957", "external_id": "66598", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Baldy Mesa Solar & Storage", "external_id": "66598", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2023-05", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BDMSS": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Baldy Mesa Solar & Storage", "plant state": "CA", "plant id": "66598", "generator id": "BDMSS", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66598", "date": "2023-12", "mw": 75}, "first_month": "2023-05", "changes": [{"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2025-10", "extra": "delayed by 22 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "10", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Baldy Mesa Solar & Storage", "plant state": "CA", "plant id": "66598", "generator id": "BDMSS", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66598", "date": "2025-10", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-05", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "go_live": "0 ~ 2025-10", "go_live_year_int": 2025, "name": "Baldy Mesa Solar & Storage", "name_short": "Baldy Mesa Solar &", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "40.91718668342877", "long": "-121.15075154591771", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.91718668342877+-121.15075154591771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pluto Energy Storage", "city": "", "id": "1332", "external_id": "67328", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Pluto Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1332", "external_id": "67328", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pluto Energy Storage", "external_id": "67328", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Pluto Energy Storage, LLC", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PLUTO": {"first": {"year": "2025", "month": "10", "entity id": "66169", "entity name": "Pluto Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Pluto Energy Storage", "plant state": "AZ", "plant id": "67328", "generator id": "PLUTO", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67328", "date": "2025-10", "mw": 75}, "first_month": "2024-04", "changes": [], "current": {"year": "2025", "month": "10", "entity id": "66169", "entity name": "Pluto Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Pluto Energy Storage", "plant state": "AZ", "plant id": "67328", "generator id": "PLUTO", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67328", "date": "2025-10", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "go_live": "0 ~ 2025-10", "go_live_year_int": 2025, "name": "Pluto Energy Storage", "name_short": "Pluto", "owner": "Pluto Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "36.417299333761584", "long": "-109.969391767415", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.417299333761584+-109.969391767415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Milagro Solar I", "city": "", "id": "1350", "external_id": "67528", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Milagro Solar I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1350", "external_id": "67528", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Milagro Solar I", "external_id": "67528", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Milagro Solar I, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MLRBS": {"first": {"year": "2025", "month": "10", "entity id": "66250", "entity name": "Milagro Solar I, LLC", "plant producer type": "IPP", "plant name": "Milagro Solar I", "plant state": "NM", "plant id": "67528", "generator id": "MLRBS", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67528", "date": "2025-10", "mw": 75}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "10", "entity id": "66250", "entity name": "Milagro Solar I, LLC", "plant producer type": "IPP", "plant name": "Milagro Solar I", "plant state": "NM", "plant id": "67528", "generator id": "MLRBS", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67528", "date": "2025-10", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "month_disappeared": "", "go_live": "0 ~ 2025-10", "go_live_year_int": 2025, "name": "Milagro Solar I", "name_short": "Milagro Solar I", "owner": "Milagro Solar I, LLC", "state": "new mexico", "country": "usa", "lat": "36.449861", "long": "-103.77797899999999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.449861+-103.77797899999999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaver Creek I", "city": "", "id": "558", "external_id": "65019", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Beaver Creek Wind I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "558", "external_id": "65019", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaver Creek I", "external_id": "65019", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Beaver Creek Wind I, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCW1B": {"first": {"year": "2023", "month": "6", "entity id": "64434", "entity name": "Beaver Creek Wind I, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek I", "plant state": "MT", "plant id": "65019", "generator id": "BCW1B", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65019", "date": "2023-06", "mw": 30}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-09", "extra": "delayed by 9 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "9", "entity id": "64434", "entity name": "Beaver Creek Wind I, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek I", "plant state": "MT", "plant id": "65019", "generator id": "BCW1B", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65019", "date": "2025-09", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "go_live": "0 ~ 2025-09", "go_live_year_int": 2025, "name": "Beaver Creek I", "name_short": "Beaver Creek I", "owner": "Beaver Creek Wind I, LLC", "state": "montana", "country": "usa", "lat": "48.48858627036728", "long": "-105.49814730955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.48858627036728+-105.49814730955251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaver Creek IV", "city": "", "id": "559", "external_id": "65023", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Beaver Creek Wind IV, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "559", "external_id": "65023", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaver Creek IV", "external_id": "65023", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Beaver Creek Wind IV, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCW4B": {"first": {"year": "2023", "month": "6", "entity id": "64437", "entity name": "Beaver Creek Wind IV, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek IV", "plant state": "MT", "plant id": "65023", "generator id": "BCW4B", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65023", "date": "2023-06", "mw": 30}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-09", "extra": "delayed by 9 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "9", "entity id": "64437", "entity name": "Beaver Creek Wind IV, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek IV", "plant state": "MT", "plant id": "65023", "generator id": "BCW4B", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65023", "date": "2025-09", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "go_live": "0 ~ 2025-09", "go_live_year_int": 2025, "name": "Beaver Creek IV", "name_short": "Beaver Creek IV", "owner": "Beaver Creek Wind IV, LLC", "state": "montana", "country": "usa", "lat": "48.558727935676266", "long": "-105.43802115814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.558727935676266+-105.43802115814404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Noria Hondo Solar (Hybrid)", "city": "", "id": "628", "external_id": "65344", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Noria Hondo Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "628", "external_id": "65344", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Noria Hondo Solar (Hybrid)", "external_id": "65344", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Noria Hondo Solar LLC", "status": "planning", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"66149": {"first": {"year": "2024", "month": "9", "entity id": "64674", "entity name": "Noria Hondo Solar LLC", "plant producer type": "IPP", "plant name": "Noria Hondo Solar (Hybrid)", "plant state": "TX", "plant id": "65344", "generator id": "66149", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65344", "date": "2024-09", "mw": 75}, "first_month": "2022-03", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2024-09", "to": "2025-09", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "9", "entity id": "64674", "entity name": "Noria Hondo Solar LLC", "plant producer type": "IPP", "plant name": "Noria Hondo Solar (Hybrid)", "plant state": "TX", "plant id": "65344", "generator id": "66149", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65344", "date": "2025-09", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "go_live": "0 ~ 2025-09", "go_live_year_int": 2025, "name": "Noria Hondo Solar (Hybrid)", "name_short": "Noria Hondo Solar (Hybrid)", "owner": "Noria Hondo Solar LLC", "state": "texas", "country": "usa", "lat": "33.58101561449517", "long": "-95.448185670785", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.58101561449517+-95.448185670785", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beehive Energy Storage", "city": "", "id": "1307", "external_id": "67184", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Beehive Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1307", "external_id": "67184", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beehive Energy Storage", "external_id": "67184", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Beehive Energy Storage, LLC", "status": "planning", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BHV1": {"first": {"year": "2025", "month": "9", "entity id": "66053", "entity name": "Beehive Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Beehive Energy Storage", "plant state": "AZ", "plant id": "67184", "generator id": "BHV1", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67184", "date": "2025-09", "mw": 250}, "first_month": "2024-02", "changes": [], "current": {"year": "2025", "month": "9", "entity id": "66053", "entity name": "Beehive Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Beehive Energy Storage", "plant state": "AZ", "plant id": "67184", "generator id": "BHV1", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67184", "date": "2025-09", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "month_disappeared": "", "go_live": "0 ~ 2025-09", "go_live_year_int": 2025, "name": "Beehive Energy Storage", "name_short": "Beehive", "owner": "Beehive Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "36.60301761713374", "long": "-109.97577292885305", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.60301761713374+-109.97577292885305", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cross Town", "city": "Gorham", "id": "114", "external_id": "66606", "state": "maine", "country": "usa", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "175", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.68383", "long": "-70.39786", "coords_hint": "1", "use_case": "", "notes": "pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ** got the info about tesla from twitter thread as all plus power project seem to be tesla", "project_website": "https://www.crosstownenergystorage.com/about", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "114", "external_id": "66606", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cross Town Energy Storage", "external_id": "66606", "state": "maine", "country": "usa", "mwh": 0, "estimate_mwh": 350, "power_mw": 175, "owner": "Cross Town Energy Storage LLC", "status": "construction", "date_first_heard": "2023-05", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CROS1": {"first": {"year": "2025", "month": "3", "entity id": "65639", "entity name": "Cross Town Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cross Town Energy Storage", "plant state": "ME", "plant id": "66606", "generator id": "CROS1", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66606", "date": "2025-03", "mw": 175}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-03", "to": "2025-08", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "8", "entity id": "65639", "entity name": "Cross Town Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cross Town Energy Storage", "plant state": "ME", "plant id": "66606", "generator id": "CROS1", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66606", "date": "2025-08", "mw": 175}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 175, "mwh_is_estimate": false, "mwh": 350, "mwh_estimate": 350, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-05", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "go_live": "0 ~ 2025-08", "go_live_year_int": 2025, "name": "Cross Town Energy Storage", "name_short": "Cross Town", "owner": "Cross Town Energy Storage LLC", "state": "maine", "country": "usa", "lat": "43.68383", "long": "-70.39786", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:43.68383+-70.39786", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ", " got the info about tesla from twitter thread as all plus power project seem to be tesla"], "links": ["https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Midpoint Solar, LLC", "city": "", "id": "1062", "external_id": "66897", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "104", "power_mw": "52", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1062", "external_id": "66897", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Midpoint Solar, LLC", "external_id": "66897", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 104, "power_mw": 52, "owner": "Sunraycer Assets I LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MIDBA": {"first": {"year": "2025", "month": "8", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Midpoint Solar, LLC", "plant state": "TX", "plant id": "66897", "generator id": "MIDBA", "net summer capacity (mw)": "52.2", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66897", "date": "2025-08", "mw": 52}, "first_month": "2023-09", "changes": [], "current": {"year": "2025", "month": "8", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Midpoint Solar, LLC", "plant state": "TX", "plant id": "66897", "generator id": "MIDBA", "net summer capacity (mw)": "52.2", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66897", "date": "2025-08", "mw": 52}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 52, "mwh_is_estimate": true, "mwh": 104, "mwh_estimate": 104, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "go_live": "0 ~ 2025-08", "go_live_year_int": 2025, "name": "Midpoint Solar, LLC", "name_short": "Midpoint Solar", "owner": "Sunraycer Assets I LLC", "state": "texas", "country": "usa", "lat": "33.550450781375964", "long": "-95.1407592129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.550450781375964+-95.1407592129225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TREX US Red Holly", "city": "", "id": "252", "external_id": "63202", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "TREX US Red Holly LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "252", "external_id": "63202", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TREX US Red Holly", "external_id": "63202", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "TREX US Red Holly LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"701-S": {"first": {"year": "2021", "month": "8", "entity id": "62936", "entity name": "TREX US Red Holly LLC", "plant producer type": "IPP", "plant name": "TREX US Red Holly", "plant state": "TX", "plant id": "63202", "generator id": "701-S", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63202", "date": "2021-08", "mw": 50}, "first_month": "2020-09", "changes": [{"month": "2021-05", "li": [{"name": "date", "from": "2021-08", "to": "2022-05", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-05", "to": "2024-07", "extra": "delayed by 26 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-07", "to": "2025-07", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "7", "entity id": "62936", "entity name": "TREX US Red Holly LLC", "plant producer type": "IPP", "plant name": "TREX US Red Holly", "plant state": "TX", "plant id": "63202", "generator id": "701-S", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63202", "date": "2025-07", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "TREX US Red Holly", "name_short": "TREX US Red Holly", "owner": "TREX US Red Holly LLC", "state": "texas", "country": "usa", "lat": "33.369412923669884", "long": "-95.38993644719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.369412923669884+-95.38993644719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lunis Creek Solar and BESS SLF", "city": "", "id": "783", "external_id": "65852", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1242", "power_mw": "621", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "783", "external_id": "65852", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lunis Creek Solar and BESS SLF", "external_id": "65852", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 1242, "power_mw": 621, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LUNBS": {"first": {"year": "2024", "month": "3", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Lunis Creek Solar and BESS SLF", "plant state": "TX", "plant id": "65852", "generator id": "LUNBS", "net summer capacity (mw)": "621.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65852", "date": "2024-03", "mw": 621}, "first_month": "2022-09", "changes": [{"month": "2023-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-12", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2025-07", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "7", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Lunis Creek Solar and BESS SLF", "plant state": "TX", "plant id": "65852", "generator id": "LUNBS", "net summer capacity (mw)": "621.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65852", "date": "2025-07", "mw": 621}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 621, "mwh_is_estimate": true, "mwh": 1242, "mwh_estimate": 1242, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Lunis Creek Solar and BESS SLF", "name_short": "Lunis Creek Solar and BESS SLF", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "33.63689184072874", "long": "-95.1405985329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.63689184072874+-95.1405985329819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tehuacana Creek 1 Solar and BESS", "city": "", "id": "788", "external_id": "65855", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.02785", "long": "-96.498753", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, "internal_id": "788", "external_id": "65855", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Tehuacana Creek 1 Solar and BESS", "external_id": "65855", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 836, "power_mw": 418, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TE1BS": {"first": {"year": "2024", "month": "5", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Tehuacana Creek 1 Solar and BESS", "plant state": "TX", "plant id": "65855", "generator id": "TE1BS", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65855", "date": "2024-05", "mw": 350}, "first_month": "2022-09", "changes": [{"month": "2023-07", "li": [{"name": "date", "from": "2024-05", "to": "2025-07", "extra": "delayed by 14 months", "change_type": "timing"}, {"name": "mw", "from": 350, "to": 418, "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "7", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Tehuacana Creek 1 Solar and BESS", "plant state": "TX", "plant id": "65855", "generator id": "TE1BS", "net summer capacity (mw)": "418", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65855", "date": "2025-07", "mw": 418}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 418, "mwh_is_estimate": true, "mwh": 836, "mwh_estimate": 836, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Tehuacana Creek 1 Solar and BESS", "name_short": "Tehuacana Creek 1 Solar", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "32.02785", "long": "-96.498753", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.02785+-96.498753", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarproponent.com/projects/#"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mulligan Solar, LLC", "city": "", "id": "971", "external_id": "65349", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Mulligan Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "971", "external_id": "65349", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mulligan Solar, LLC", "external_id": "65349", "state": "illinois", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Mulligan Solar", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MLGA2": {"first": {"year": "2025", "month": "6", "entity id": "64684", "entity name": "Mulligan Solar", "plant producer type": "IPP", "plant name": "Mulligan Solar, LLC", "plant state": "IL", "plant id": "65349", "generator id": "MLGA2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65349", "date": "2025-06", "mw": 40}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2025-06", "to": "2025-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2025", "month": "7", "entity id": "64684", "entity name": "Mulligan Solar", "plant producer type": "IPP", "plant name": "Mulligan Solar, LLC", "plant state": "IL", "plant id": "65349", "generator id": "MLGA2", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65349", "date": "2025-07", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Mulligan Solar, LLC", "name_short": "Mulligan Solar", "owner": "Mulligan Solar", "state": "illinois", "country": "usa", "lat": "42.275655246911256", "long": "-88.86110215563981", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.275655246911256+-88.86110215563981", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brendale BESS", "city": "brisbane", "id": "1392", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "410", "estimate_mwh": "", "power_mw": "205", "customer": "", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.329132", "long": "152.973193", "coords_hint": "1", "use_case": "", "notes": "got the location from the picture and in the energy storage article it says it is hosted on unitywater site", "project_website": "https://akayshaenergy.com/projects/brendale-bess", "link1": "https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1392", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 205, "mwh_is_estimate": false, "mwh": 410, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Brendale BESS", "name_short": "Brendale", "owner": "Akaysha Energy", "state": "queensland", "country": "australia", "lat": "-27.329132", "long": "152.973193", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.329132+152.973193", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the location from the picture and in the energy storage article it says it is hosted on unitywater site"], "links": ["https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Black Walnut Energy Storage LLC", "city": "", "id": "622", "external_id": "65396", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Black Walnut Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "622", "external_id": "65396", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Black Walnut Energy Storage LLC", "external_id": "65396", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Black Walnut Energy Storage LLC", "status": "planning", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BW1": {"first": {"year": "2023", "month": "6", "entity id": "64739", "entity name": "Black Walnut Energy Storage LLC", "plant producer type": "IPP", "plant name": "Black Walnut Energy Storage LLC", "plant state": "CA", "plant id": "65396", "generator id": "BW1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65396", "date": "2023-06", "mw": 15}, "first_month": "2022-03", "changes": [{"month": "2022-10", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-12", "to": "2025-06", "extra": "delayed by 18 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "6", "entity id": "64739", "entity name": "Black Walnut Energy Storage LLC", "plant producer type": "IPP", "plant name": "Black Walnut Energy Storage LLC", "plant state": "CA", "plant id": "65396", "generator id": "BW1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65396", "date": "2025-06", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Black Walnut Energy Storage LLC", "name_short": "Black Walnut Energy Storage", "owner": "Black Walnut Energy Storage LLC", "state": "california", "country": "usa", "lat": "41.17205096119257", "long": "-121.23209157247251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17205096119257+-121.23209157247251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Humidor Storage I", "city": "", "id": "694", "external_id": "65703", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Hecate Grid Humidor Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "694", "external_id": "65703", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Humidor Storage I", "external_id": "65703", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Hecate Grid Humidor Storage 1 LLC", "status": "planning", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HEHUM": {"first": {"year": "2023", "month": "11", "entity id": "64970", "entity name": "Hecate Grid Humidor Storage 1 LLC", "plant producer type": "IPP", "plant name": "Humidor Storage I", "plant state": "CA", "plant id": "65703", "generator id": "HEHUM", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65703", "date": "2023-11", "mw": 300}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-01", "to": "2025-06", "extra": "delayed by 17 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "6", "entity id": "64970", "entity name": "Hecate Grid Humidor Storage 1 LLC", "plant producer type": "IPP", "plant name": "Humidor Storage I", "plant state": "CA", "plant id": "65703", "generator id": "HEHUM", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65703", "date": "2025-06", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2022-07", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Humidor Storage I", "name_short": "Humidor Storage I", "owner": "Hecate Grid Humidor Storage 1 LLC", "state": "california", "country": "usa", "lat": "40.867793853632904", "long": "-121.38286555449248", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.867793853632904+-121.38286555449248", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yaupon Solar Project (Hybrid)", "city": "", "id": "942", "external_id": "66216", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Yaupon Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "942", "external_id": "66216", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Yaupon Solar Project (Hybrid)", "external_id": "66216", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Yaupon Solar, LLC", "status": "planning", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2025", "month": "6", "entity id": "65329", "entity name": "Yaupon Solar, LLC", "plant producer type": "IPP", "plant name": "Yaupon Solar Project (Hybrid)", "plant state": "TX", "plant id": "66216", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66216", "date": "2025-06", "mw": 100}, "first_month": "2023-02", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "65329", "entity name": "Yaupon Solar, LLC", "plant producer type": "IPP", "plant name": "Yaupon Solar Project (Hybrid)", "plant state": "TX", "plant id": "66216", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66216", "date": "2025-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-02", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Yaupon Solar Project (Hybrid)", "name_short": "Yaupon Solar Project (Hybrid)", "owner": "Yaupon Solar, LLC", "state": "texas", "country": "usa", "lat": "33.526939371284264", "long": "-95.1731198926975", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.526939371284264+-95.1731198926975", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "OCI SunRoper", "city": "", "id": "980", "external_id": "65893", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "520", "power_mw": "260", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "980", "external_id": "65893", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "OCI SunRoper", "external_id": "65893", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 520, "power_mw": 260, "owner": "OCI Solar Power", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OCIES": {"first": {"year": "2025", "month": "6", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "OCI SunRoper", "plant state": "TX", "plant id": "65893", "generator id": "OCIES", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65893", "date": "2025-06", "mw": 260}, "first_month": "2023-03", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "OCI SunRoper", "plant state": "TX", "plant id": "65893", "generator id": "OCIES", "net summer capacity (mw)": "260", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65893", "date": "2025-06", "mw": 260}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 260, "mwh_is_estimate": true, "mwh": 520, "mwh_estimate": 520, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "OCI SunRoper", "name_short": "OCI SunRoper", "owner": "OCI Solar Power", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.113438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.113438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elevate Middletown", "city": "", "id": "1041", "external_id": "66786", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "550", "power_mw": "275", "customer": "", "owner": "Elevate Middletown, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1041", "external_id": "66786", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elevate Middletown", "external_id": "66786", "state": "connecticut", "country": "usa", "mwh": 0, "estimate_mwh": 550, "power_mw": 275, "owner": "Elevate Middletown, LLC", "status": "planning", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELVMT": {"first": {"year": "2025", "month": "6", "entity id": "65762", "entity name": "Elevate Middletown, LLC", "plant producer type": "IPP", "plant name": "Elevate Middletown", "plant state": "CT", "plant id": "66786", "generator id": "ELVMT", "net summer capacity (mw)": "275", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66786", "date": "2025-06", "mw": 275}, "first_month": "2023-08", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "65762", "entity name": "Elevate Middletown, LLC", "plant producer type": "IPP", "plant name": "Elevate Middletown", "plant state": "CT", "plant id": "66786", "generator id": "ELVMT", "net summer capacity (mw)": "275", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66786", "date": "2025-06", "mw": 275}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 275, "mwh_is_estimate": true, "mwh": 550, "mwh_estimate": 550, "status": "planning", "status_class": "", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Elevate Middletown", "name_short": "Elevate Middletown", "owner": "Elevate Middletown, LLC", "state": "connecticut", "country": "usa", "lat": "41.93570473342624", "long": "-71.93485223533789", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.93570473342624+-71.93485223533789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elevate Arthur Kill", "city": "", "id": "1052", "external_id": "66785", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "GB Arthur Kill Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1052", "external_id": "66785", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elevate Arthur Kill", "external_id": "66785", "state": "new york", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "GB Arthur Kill Storage LLC", "status": "planning", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELVAK": {"first": {"year": "2025", "month": "6", "entity id": "65761", "entity name": "GB Arthur Kill Storage LLC", "plant producer type": "IPP", "plant name": "Elevate Arthur Kill", "plant state": "NY", "plant id": "66785", "generator id": "ELVAK", "net summer capacity (mw)": "15.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66785", "date": "2025-06", "mw": 15}, "first_month": "2023-08", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "65761", "entity name": "GB Arthur Kill Storage LLC", "plant producer type": "IPP", "plant name": "Elevate Arthur Kill", "plant state": "NY", "plant id": "66785", "generator id": "ELVAK", "net summer capacity (mw)": "15.1", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66785", "date": "2025-06", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Elevate Arthur Kill", "name_short": "Elevate Arthur Kill", "owner": "GB Arthur Kill Storage LLC", "state": "new york", "country": "usa", "lat": "42.56736592366988", "long": "-75.62003844719", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.56736592366988+-75.62003844719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Albatross Solar, LLC", "city": "", "id": "1064", "external_id": "66894", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1064", "external_id": "66894", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Albatross Solar, LLC", "external_id": "66894", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Sunraycer Assets I LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ALBBA": {"first": {"year": "2025", "month": "6", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Albatross Solar, LLC", "plant state": "TX", "plant id": "66894", "generator id": "ALBBA", "net summer capacity (mw)": "50.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66894", "date": "2025-06", "mw": 50}, "first_month": "2023-09", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "65815", "entity name": "Sunraycer Assets I LLC", "plant producer type": "IPP", "plant name": "Albatross Solar, LLC", "plant state": "TX", "plant id": "66894", "generator id": "ALBBA", "net summer capacity (mw)": "50.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66894", "date": "2025-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Albatross Solar, LLC", "name_short": "Albatross Solar", "owner": "Sunraycer Assets I LLC", "state": "texas", "country": "usa", "lat": "33.65187375538939", "long": "-95.20916246517001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65187375538939+-95.20916246517001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Swanbank", "city": "Ipswich", "id": "1321", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "", "developer": "Clean Co", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "cost_million": "330", "cost_currency": "USD", "cost_incl_solar": "", "lat": "-27.649131", "long": "152.814807", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1759460910530265090", "link2": "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/", "link3": "", "link4": ""}, "internal_id": "1321", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 500, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Swanbank", "name_short": "Swanbank", "owner": "", "state": "queensland", "country": "australia", "lat": "-27.649131", "long": "152.814807", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.649131+152.814807", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1759460910530265090", "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Sun Streams 4", "city": "", "id": "1324", "external_id": "67291", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Sun Streams Expansion, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1324", "external_id": "67291", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sun Streams 4", "external_id": "67291", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Sun Streams Expansion, LLC", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2025", "month": "6", "entity id": "66152", "entity name": "Sun Streams Expansion, LLC", "plant producer type": "IPP", "plant name": "Sun Streams 4", "plant state": "AZ", "plant id": "67291", "generator id": "GEN02", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67291", "date": "2025-06", "mw": 300}, "first_month": "2024-04", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66152", "entity name": "Sun Streams Expansion, LLC", "plant producer type": "IPP", "plant name": "Sun Streams 4", "plant state": "AZ", "plant id": "67291", "generator id": "GEN02", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67291", "date": "2025-06", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Sun Streams 4", "name_short": "Sun Streams 4", "owner": "Sun Streams Expansion, LLC", "state": "arizona", "country": "usa", "lat": "36.60016423408578", "long": "-109.84569982472001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.60016423408578+-109.84569982472001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Serrano", "city": "", "id": "1327", "external_id": "67503", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "426", "power_mw": "213", "customer": "", "owner": "Serrano Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1327", "external_id": "67503", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Serrano", "external_id": "67503", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 426, "power_mw": 213, "owner": "Serrano Solar, LLC", "status": "construction", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2025", "month": "6", "entity id": "66226", "entity name": "Serrano Solar, LLC", "plant producer type": "IPP", "plant name": "Serrano", "plant state": "AZ", "plant id": "67503", "generator id": "GEN02", "net summer capacity (mw)": "213.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67503", "date": "2025-06", "mw": 213}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66226", "entity name": "Serrano Solar, LLC", "plant producer type": "IPP", "plant name": "Serrano", "plant state": "AZ", "plant id": "67503", "generator id": "GEN02", "net summer capacity (mw)": "213.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67503", "date": "2025-06", "mw": 213}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 213, "mwh_is_estimate": true, "mwh": 426, "mwh_estimate": 426, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Serrano", "name_short": "Serrano", "owner": "Serrano Solar, LLC", "state": "arizona", "country": "usa", "lat": "36.63537829690874", "long": "-109.99928433894475", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.63537829690874+-109.99928433894475", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kuna BESS", "city": "", "id": "1345", "external_id": "67549", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Kuna BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1345", "external_id": "67549", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kuna BESS", "external_id": "67549", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Kuna BESS, LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2025", "month": "6", "entity id": "66265", "entity name": "Kuna BESS, LLC", "plant producer type": "IPP", "plant name": "Kuna BESS", "plant state": "ID", "plant id": "67549", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67549", "date": "2025-06", "mw": 150}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66265", "entity name": "Kuna BESS, LLC", "plant producer type": "IPP", "plant name": "Kuna BESS", "plant state": "ID", "plant id": "67549", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67549", "date": "2025-06", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Kuna BESS", "name_short": "Kuna", "owner": "Kuna BESS, LLC", "state": "idaho", "country": "usa", "lat": "44.453334", "long": "-112.673786", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.453334+-112.673786", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Happy Valley Battery Storage", "city": "", "id": "1346", "external_id": "67573", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "164", "power_mw": "82", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1346", "external_id": "67573", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Happy Valley Battery Storage", "external_id": "67573", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 164, "power_mw": 82, "owner": "Idaho Power Co", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HPVY": {"first": {"year": "2025", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Happy Valley Battery Storage", "plant state": "ID", "plant id": "67573", "generator id": "HPVY", "net summer capacity (mw)": "82", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67573", "date": "2025-06", "mw": 82}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Happy Valley Battery Storage", "plant state": "ID", "plant id": "67573", "generator id": "HPVY", "net summer capacity (mw)": "82", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67573", "date": "2025-06", "mw": 82}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 82, "mwh_is_estimate": true, "mwh": 164, "mwh_estimate": 164, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Happy Valley Battery Storage", "name_short": "Happy Valley", "owner": "Idaho Power Co", "state": "idaho", "country": "usa", "lat": "44.464957981454575", "long": "-112.7392976028075", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.464957981454575+-112.7392976028075", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hornshadow Solar II, LLC", "city": "", "id": "1372", "external_id": "67511", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Hornshadow Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1372", "external_id": "67511", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hornshadow Solar II, LLC", "external_id": "67511", "state": "utah", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Hornshadow Solar II, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HS2ES": {"first": {"year": "2025", "month": "6", "entity id": "66070", "entity name": "Hornshadow Solar II, LLC", "plant producer type": "IPP", "plant name": "Hornshadow Solar II, LLC", "plant state": "UT", "plant id": "67511", "generator id": "HS2ES", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67511", "date": "2025-06", "mw": 50}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66070", "entity name": "Hornshadow Solar II, LLC", "plant producer type": "IPP", "plant name": "Hornshadow Solar II, LLC", "plant state": "UT", "plant id": "67511", "generator id": "HS2ES", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67511", "date": "2025-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Hornshadow Solar II, LLC", "name_short": "Hornshadow Solar II", "owner": "Hornshadow Solar II, LLC", "state": "utah", "country": "usa", "lat": "40.588750513578184", "long": "-109.84675012696499", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.588750513578184+-109.84675012696499", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hornshadow Solar, LLC", "city": "", "id": "1373", "external_id": "67497", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Hornshadow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1373", "external_id": "67497", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hornshadow Solar, LLC", "external_id": "67497", "state": "utah", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Hornshadow Solar, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HSESS": {"first": {"year": "2025", "month": "6", "entity id": "66059", "entity name": "Hornshadow Solar, LLC", "plant producer type": "IPP", "plant name": "Hornshadow Solar, LLC", "plant state": "UT", "plant id": "67497", "generator id": "HSESS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67497", "date": "2025-06", "mw": 25}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "6", "entity id": "66059", "entity name": "Hornshadow Solar, LLC", "plant producer type": "IPP", "plant name": "Hornshadow Solar, LLC", "plant state": "UT", "plant id": "67497", "generator id": "HSESS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67497", "date": "2025-06", "mw": 25}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Hornshadow Solar, LLC", "name_short": "Hornshadow Solar", "owner": "Hornshadow Solar, LLC", "state": "utah", "country": "usa", "lat": "40.53024549915876", "long": "-109.81897476197224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.53024549915876+-109.81897476197224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Papago", "city": "Maricopa County", "id": "75", "external_id": "66779", "state": "arizona", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "", "power_mw": "300", "customer": "Recurrent Energy", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.481046", "long": "-113.03863", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/papago/", "link1": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/7254?fileID=56298", "link2": "", "link3": "", "link4": ""}, "internal_id": "75", "external_id": "66779", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Papago Energy Storage", "external_id": "66779", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "RE Papago LLC", "status": "planning", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PPABA": {"first": {"year": "2025", "month": "5", "entity id": "65751", "entity name": "RE Papago LLC", "plant producer type": "IPP", "plant name": "Papago Energy Storage", "plant state": "AZ", "plant id": "66779", "generator id": "PPABA", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66779", "date": "2025-05", "mw": 300}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "65751", "entity name": "RE Papago LLC", "plant producer type": "IPP", "plant name": "Papago Energy Storage", "plant state": "AZ", "plant id": "66779", "generator id": "PPABA", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66779", "date": "2025-05", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": false, "mwh": 1200, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Papago Energy Storage", "name_short": "Papago", "owner": "RE Papago LLC", "state": "arizona", "country": "usa", "lat": "33.481046", "long": "-113.03863", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.481046+-113.03863", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.maricopa.gov/AgendaCenter/ViewFile/Item/7254?fileID=56298"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cranberry Point", "city": "Carver", "id": "113", "external_id": "62844", "state": "massachusetts", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.896693", "long": "-70.786639", "coords_hint": "1", "use_case": "", "notes": "got the info about tesla as manufacturer from twitter thread and FAQ on the project website", "project_website": "https://cranberrypointenergystorage.com/", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "113", "external_id": "62844", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cranberry Point Energy Storage", "external_id": "62844", "state": "massachusetts", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Cranberry Point Energy Storage LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NA": {"first": {"year": "2023", "month": "5", "entity id": "62733", "entity name": "Cranberry Point Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cranberry Point Energy Storage", "plant state": "MA", "plant id": "62844", "generator id": "NA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62844", "date": "2023-05", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2023-05", "to": "2024-06", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-06", "to": "2025-05", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "5", "entity id": "62733", "entity name": "Cranberry Point Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cranberry Point Energy Storage", "plant state": "MA", "plant id": "62844", "generator id": "NA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62844", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Cranberry Point Energy Storage", "name_short": "Cranberry Point", "owner": "Cranberry Point Energy Storage LLC", "state": "massachusetts", "country": "usa", "lat": "41.896693", "long": "-70.786639", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.896693+-70.786639", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the info about tesla as manufacturer from twitter thread and FAQ on the project website"], "links": ["https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Big Rock Solar Farm", "city": "", "id": "162", "external_id": "64636", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "92JT 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "162", "external_id": "64636", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Big Rock Solar Farm", "external_id": "64636", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "92JT 8me, LLC", "status": "planning", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"92JTB": {"first": {"year": "2022", "month": "12", "entity id": "64244", "entity name": "92JT 8me, LLC", "plant producer type": "IPP", "plant name": "Big Rock Solar Farm", "plant state": "CA", "plant id": "64636", "generator id": "92JTB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64636", "date": "2022-12", "mw": 200}, "first_month": "2021-06", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-12", "to": "2023-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2025-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "64244", "entity name": "92JT 8me, LLC", "plant producer type": "IPP", "plant name": "Big Rock Solar Farm", "plant state": "CA", "plant id": "64636", "generator id": "92JTB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64636", "date": "2025-05", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Big Rock Solar Farm", "name_short": "Big Rock Solar Farm", "owner": "92JT 8me, LLC", "state": "california", "country": "usa", "lat": "41.21907378137597", "long": "-121.1673702129225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.21907378137597+-121.1673702129225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaver Creek II", "city": "", "id": "560", "external_id": "65020", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Beaver Creek Wind II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "560", "external_id": "65020", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaver Creek II", "external_id": "65020", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Beaver Creek Wind II, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCW2B": {"first": {"year": "2023", "month": "6", "entity id": "64435", "entity name": "Beaver Creek Wind II, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek II", "plant state": "MT", "plant id": "65020", "generator id": "BCW2B", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65020", "date": "2023-06", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "64435", "entity name": "Beaver Creek Wind II, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek II", "plant state": "MT", "plant id": "65020", "generator id": "BCW2B", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65020", "date": "2025-05", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Beaver Creek II", "name_short": "Beaver Creek II", "owner": "Beaver Creek Wind II, LLC", "state": "montana", "country": "usa", "lat": "48.650815", "long": "-105.60143599999999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.650815+-105.60143599999999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaver Creek III", "city": "", "id": "561", "external_id": "65021", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Beaver Creek Wind III, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "561", "external_id": "65021", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaver Creek III", "external_id": "65021", "state": "montana", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Beaver Creek Wind III, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BCW3B": {"first": {"year": "2023", "month": "6", "entity id": "64436", "entity name": "Beaver Creek Wind III, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek III", "plant state": "MT", "plant id": "65021", "generator id": "BCW3B", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65021", "date": "2023-06", "mw": 20}, "first_month": "2021-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-06", "to": "2024-12", "extra": "delayed by 18 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2025-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "64436", "entity name": "Beaver Creek Wind III, LLC", "plant producer type": "IPP", "plant name": "Beaver Creek III", "plant state": "MT", "plant id": "65021", "generator id": "BCW3B", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65021", "date": "2025-05", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Beaver Creek III", "name_short": "Beaver Creek III", "owner": "Beaver Creek Wind III, LLC", "state": "montana", "country": "usa", "lat": "48.694695413201245", "long": "-105.58638597468608", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.694695413201245+-105.58638597468608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rowdy Creek Solar and BESS", "city": "", "id": "787", "external_id": "65854", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.639763", "long": "-95.58367", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, "internal_id": "787", "external_id": "65854", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rowdy Creek Solar and BESS", "external_id": "65854", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 700, "power_mw": 350, "owner": "Solar Proponent LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RDYBS": {"first": {"year": "2024", "month": "5", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Rowdy Creek Solar and BESS", "plant state": "TX", "plant id": "65854", "generator id": "RDYBS", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65854", "date": "2024-05", "mw": 350}, "first_month": "2022-09", "changes": [{"month": "2023-07", "li": [{"name": "date", "from": "2024-05", "to": "2025-05", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "65079", "entity name": "Solar Proponent LLC", "plant producer type": "IPP", "plant name": "Rowdy Creek Solar and BESS", "plant state": "TX", "plant id": "65854", "generator id": "RDYBS", "net summer capacity (mw)": "350", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65854", "date": "2025-05", "mw": 350}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 350, "mwh_is_estimate": true, "mwh": 700, "mwh_estimate": 700, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Rowdy Creek Solar and BESS", "name_short": "Rowdy Creek Solar", "owner": "Solar Proponent LLC", "state": "texas", "country": "usa", "lat": "33.639763", "long": "-95.58367", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.639763+-95.58367", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarproponent.com/projects/#"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oriana Solar LLC", "city": "", "id": "799", "external_id": "65849", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Oriana Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "799", "external_id": "65849", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Oriana Solar LLC", "external_id": "65849", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 122, "power_mw": 61, "owner": "Oriana Solar LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ORIBS": {"first": {"year": "2024", "month": "6", "entity id": "65081", "entity name": "Oriana Solar LLC", "plant producer type": "IPP", "plant name": "Oriana Solar LLC", "plant state": "TX", "plant id": "65849", "generator id": "ORIBS", "net summer capacity (mw)": "61", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65849", "date": "2024-06", "mw": 61}, "first_month": "2022-09", "changes": [{"month": "2023-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-12", "to": "2025-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "5", "entity id": "65081", "entity name": "Oriana Solar LLC", "plant producer type": "IPP", "plant name": "Oriana Solar LLC", "plant state": "TX", "plant id": "65849", "generator id": "ORIBS", "net summer capacity (mw)": "61", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65849", "date": "2025-05", "mw": 61}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 61, "mwh_is_estimate": true, "mwh": 122, "mwh_estimate": 122, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Oriana Solar LLC", "name_short": "Oriana Solar", "owner": "Oriana Solar LLC", "state": "texas", "country": "usa", "lat": "33.33724557612627", "long": "-94.91393863684043", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.33724557612627+-94.91393863684043", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ash Creek BESS", "city": "", "id": "979", "external_id": "66391", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "612", "power_mw": "306", "customer": "", "owner": "ACTX BESS Project LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "979", "external_id": "66391", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ash Creek BESS", "external_id": "66391", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 612, "power_mw": 306, "owner": "ACTX BESS Project LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2025", "month": "5", "entity id": "65410", "entity name": "ACTX BESS Project LLC", "plant producer type": "IPP", "plant name": "Ash Creek BESS", "plant state": "TX", "plant id": "66391", "generator id": "BESS", "net summer capacity (mw)": "306", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66391", "date": "2025-05", "mw": 306}, "first_month": "2023-04", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "65410", "entity name": "ACTX BESS Project LLC", "plant producer type": "IPP", "plant name": "Ash Creek BESS", "plant state": "TX", "plant id": "66391", "generator id": "BESS", "net summer capacity (mw)": "306", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66391", "date": "2025-05", "mw": 306}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 306, "mwh_is_estimate": true, "mwh": 612, "mwh_estimate": 612, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Ash Creek BESS", "name_short": "Ash Creek", "owner": "ACTX BESS Project LLC", "state": "texas", "country": "usa", "lat": "33.349606255901264", "long": "-94.95198089749223", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.349606255901264+-94.95198089749223", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peregrine BESS 1", "city": "", "id": "990", "external_id": "66301", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "990", "external_id": "66301", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peregrine BESS 1", "external_id": "66301", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PGBS1": {"first": {"year": "2025", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Peregrine BESS 1", "plant state": "TX", "plant id": "66301", "generator id": "PGBS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66301", "date": "2025-05", "mw": 150}, "first_month": "2023-03", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Peregrine BESS 1", "plant state": "TX", "plant id": "66301", "generator id": "PGBS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66301", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Peregrine BESS 1", "name_short": "Peregrine BESS 1", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.453438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.453438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peregrine BESS 2", "city": "", "id": "991", "external_id": "66302", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "991", "external_id": "66302", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peregrine BESS 2", "external_id": "66302", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PGBS2": {"first": {"year": "2025", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Peregrine BESS 2", "plant state": "TX", "plant id": "66302", "generator id": "PGBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66302", "date": "2025-05", "mw": 150}, "first_month": "2023-03", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Peregrine BESS 2", "plant state": "TX", "plant id": "66302", "generator id": "PGBS2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66302", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Peregrine BESS 2", "name_short": "Peregrine BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.39163256713626", "long": "-95.46555141629162", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.39163256713626+-95.46555141629162", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "MRG Goody Solar Project Hybrid", "city": "", "id": "1003", "external_id": "66390", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "MRG Goody Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1003", "external_id": "66390", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "MRG Goody Solar Project Hybrid", "external_id": "66390", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "MRG Goody Solar Project, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GDYES": {"first": {"year": "2025", "month": "5", "entity id": "65445", "entity name": "MRG Goody Solar Project, LLC", "plant producer type": "IPP", "plant name": "MRG Goody Solar Project Hybrid", "plant state": "TX", "plant id": "66390", "generator id": "GDYES", "net summer capacity (mw)": "50.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66390", "date": "2025-05", "mw": 50}, "first_month": "2023-04", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "65445", "entity name": "MRG Goody Solar Project, LLC", "plant producer type": "IPP", "plant name": "MRG Goody Solar Project Hybrid", "plant state": "TX", "plant id": "66390", "generator id": "GDYES", "net summer capacity (mw)": "50.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66390", "date": "2025-05", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "MRG Goody Solar Project Hybrid", "name_short": "MRG Goody Solar", "owner": "MRG Goody Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.507449121628746", "long": "-95.2346441733487", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.507449121628746+-95.2346441733487", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Indigo Solar & Storage", "city": "", "id": "1063", "external_id": "66891", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "GGS Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1063", "external_id": "66891", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Indigo Solar & Storage", "external_id": "66891", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "GGS Energy LLC", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"245BS": {"first": {"year": "2025", "month": "5", "entity id": "65814", "entity name": "GGS Energy LLC", "plant producer type": "IPP", "plant name": "Indigo Solar & Storage", "plant state": "TX", "plant id": "66891", "generator id": "245BS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66891", "date": "2025-05", "mw": 50}, "first_month": "2023-09", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "65814", "entity name": "GGS Energy LLC", "plant producer type": "IPP", "plant name": "Indigo Solar & Storage", "plant state": "TX", "plant id": "66891", "generator id": "245BS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66891", "date": "2025-05", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Indigo Solar & Storage", "name_short": "Indigo Solar &", "owner": "GGS Energy LLC", "state": "texas", "country": "usa", "lat": "33.60453116095374", "long": "-95.1641099430736", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.60453116095374+-95.1641099430736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Harquahala 2", "city": "", "id": "1330", "external_id": "67474", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Copia Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1330", "external_id": "67474", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Harquahala 2", "external_id": "67474", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Copia Power", "status": "construction", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2025", "month": "5", "entity id": "66217", "entity name": "Copia Power", "plant producer type": "IPP", "plant name": "Harquahala 2", "plant state": "AZ", "plant id": "67474", "generator id": "BESS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67474", "date": "2025-05", "mw": 150}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "66217", "entity name": "Copia Power", "plant producer type": "IPP", "plant name": "Harquahala 2", "plant state": "AZ", "plant id": "67474", "generator id": "BESS1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67474", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Harquahala 2", "name_short": "Harquahala 2", "owner": "Copia Power", "state": "arizona", "country": "usa", "lat": "36.478429", "long": "-109.945254", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.478429+-109.945254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scatter Wash 2", "city": "", "id": "1331", "external_id": "67455", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "170", "power_mw": "85", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1331", "external_id": "67455", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Scatter Wash 2", "external_id": "67455", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 170, "power_mw": 85, "owner": "Strata Manager, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SW2": {"first": {"year": "2025", "month": "5", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Scatter Wash 2", "plant state": "AZ", "plant id": "67455", "generator id": "SW2", "net summer capacity (mw)": "85", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67455", "date": "2025-05", "mw": 85}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Scatter Wash 2", "plant state": "AZ", "plant id": "67455", "generator id": "SW2", "net summer capacity (mw)": "85", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67455", "date": "2025-05", "mw": 85}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 85, "mwh_is_estimate": true, "mwh": 170, "mwh_estimate": 170, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Scatter Wash 2", "name_short": "Scatter Wash 2", "owner": "Strata Manager, LLC", "state": "arizona", "country": "usa", "lat": "36.453089606461255", "long": "-109.9632406343362", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.453089606461255+-109.9632406343362", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carne Energy Storage, LLC", "city": "", "id": "1348", "external_id": "67230", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "260", "power_mw": "130", "customer": "", "owner": "Carne Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1348", "external_id": "67230", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Carne Energy Storage, LLC", "external_id": "67230", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 260, "power_mw": 130, "owner": "Carne Energy Storage, LLC", "status": "planning", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CS": {"first": {"year": "2025", "month": "5", "entity id": "66107", "entity name": "Carne Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Carne Energy Storage, LLC", "plant state": "NM", "plant id": "67230", "generator id": "CS", "net summer capacity (mw)": "130", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67230", "date": "2025-05", "mw": 130}, "first_month": "2024-03", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "66107", "entity name": "Carne Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Carne Energy Storage, LLC", "plant state": "NM", "plant id": "67230", "generator id": "CS", "net summer capacity (mw)": "130", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "67230", "date": "2025-05", "mw": 130}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 130, "mwh_is_estimate": true, "mwh": 260, "mwh_estimate": 260, "status": "planning", "status_class": "", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Carne Energy Storage, LLC", "name_short": "Carne Energy Storage", "owner": "Carne Energy Storage, LLC", "state": "new mexico", "country": "usa", "lat": "36.60033402458687", "long": "-103.88508735055998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.60033402458687+-103.88508735055998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Willow Energy Storage", "city": "", "id": "1364", "external_id": "67598", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Desert Willow Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1364", "external_id": "67598", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Willow Energy Storage", "external_id": "67598", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Desert Willow Energy Storage", "status": "construction", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DWES": {"first": {"year": "2025", "month": "5", "entity id": "66292", "entity name": "Desert Willow Energy Storage", "plant producer type": "IPP", "plant name": "Desert Willow Energy Storage", "plant state": "TX", "plant id": "67598", "generator id": "DWES", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67598", "date": "2025-05", "mw": 150}, "first_month": "2024-06", "changes": [], "current": {"year": "2025", "month": "5", "entity id": "66292", "entity name": "Desert Willow Energy Storage", "plant producer type": "IPP", "plant name": "Desert Willow Energy Storage", "plant state": "TX", "plant id": "67598", "generator id": "DWES", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67598", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Desert Willow Energy Storage", "name_short": "Desert Willow", "owner": "Desert Willow Energy Storage", "state": "texas", "country": "usa", "lat": "33.65187375538939", "long": "-95.20916246517001", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65187375538939+-95.20916246517001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Nighthawk Energy Storage, LLC", "city": "", "id": "774", "external_id": "65889", "state": "california", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "600", "power_mw": "300", "customer": "arevon", "owner": "Nighthawk Energy Storage, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.957486", "long": "-117.038749", "coords_hint": "3", "use_case": "", "notes": "got the coords from arevon website, but probably not the exact location yet", "project_website": "https://arevonenergy.com/location/nighthawk/", "link1": "https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/", "link2": "", "link3": "", "link4": ""}, "internal_id": "774", "external_id": "65889", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Nighthawk Energy Storage, LLC", "external_id": "65889", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Nighthawk Energy Storage, LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "6", "entity id": "65088", "entity name": "Nighthawk Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Nighthawk Energy Storage, LLC", "plant state": "CA", "plant id": "65889", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65889", "date": "2024-06", "mw": 300}, "first_month": "2022-09", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-02", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-02", "to": "2025-04", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "4", "entity id": "65088", "entity name": "Nighthawk Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Nighthawk Energy Storage, LLC", "plant state": "CA", "plant id": "65889", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65889", "date": "2025-04", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": false, "mwh": 1200, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Nighthawk Energy Storage, LLC", "name_short": "Nighthawk Energy Storage", "owner": "Nighthawk Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.957486", "long": "-117.038749", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.957486+-117.038749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the coords from arevon website, but probably not the exact location yet"], "links": ["https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "MacDill Storage", "city": "", "id": "1043", "external_id": "66869", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1043", "external_id": "66869", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "South Tampa Energy Storage", "external_id": "66869", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Tampa Electric Co", "status": "planning", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2025", "month": "4", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "MacDill Storage", "plant state": "FL", "plant id": "66869", "generator id": "BESS1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66869", "date": "2025-04", "mw": 20}, "first_month": "2023-09", "changes": [{"month": "2024-03", "li": [{"name": "plant name", "from": "MacDill Storage", "to": "South Tampa Energy Storage", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "4", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "South Tampa Energy Storage", "plant state": "FL", "plant id": "66869", "generator id": "BESS1", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66869", "date": "2025-04", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "South Tampa Energy Storage", "name_short": "South Tampa", "owner": "Tampa Electric Co", "state": "florida", "country": "usa", "lat": "30.25010048117874", "long": "-82.0617053531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.25010048117874+-82.0617053531653", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scatter Wash BESS", "city": "Phoenix", "id": "1322", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "1020", "estimate_mwh": "", "power_mw": "255", "customer": "", "owner": "", "developer": "Strata Clean Energy", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "500", "cost_currency": "USD", "cost_incl_solar": "", "lat": "33.685402", "long": "-112.125062", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1748500029197726146", "link2": "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/", "link3": "", "link4": ""}, "internal_id": "1322", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 255, "mwh_is_estimate": false, "mwh": 1020, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Scatter Wash BESS", "name_short": "Scatter Wash", "owner": "", "state": "arizona", "country": "usa", "lat": "33.685402", "long": "-112.125062", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.685402+-112.125062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1748500029197726146", "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Scatter Wash 1", "city": "", "id": "1329", "external_id": "67454", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "340", "power_mw": "170", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1329", "external_id": "67454", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Scatter Wash 1", "external_id": "67454", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 340, "power_mw": 170, "owner": "Strata Manager, LLC", "status": "planning", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SW1": {"first": {"year": "2025", "month": "4", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Scatter Wash 1", "plant state": "AZ", "plant id": "67454", "generator id": "SW1", "net summer capacity (mw)": "170", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67454", "date": "2025-04", "mw": 170}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "4", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Scatter Wash 1", "plant state": "AZ", "plant id": "67454", "generator id": "SW1", "net summer capacity (mw)": "170", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "67454", "date": "2025-04", "mw": 170}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 170, "mwh_is_estimate": true, "mwh": 340, "mwh_estimate": 340, "status": "planning", "status_class": "", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Scatter Wash 1", "name_short": "Scatter Wash 1", "owner": "Strata Manager, LLC", "state": "arizona", "country": "usa", "lat": "36.55197504466123", "long": "-110.11160545087824", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.55197504466123+-110.11160545087824", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eland Solar & Storage Center, Phase 2 Hybrid", "city": "", "id": "164", "external_id": "61169", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "69SV 8me LLC", "developer": "Arevon", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "150", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "35.198008", "long": "-117.994", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1760848348607594844", "link2": "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "link3": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link4": ""}, "internal_id": "164", "external_id": "61169", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eland Solar & Storage Center, Phase 2 Hybrid", "external_id": "61169", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "69SV 8me LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61169": {"first": {"year": "2023", "month": "7", "entity id": "60798", "entity name": "69SV 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 2 Hybrid", "plant state": "CA", "plant id": "61169", "generator id": "61169", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61169", "date": "2023-07", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-11", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-11", "to": "2025-03", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "3", "entity id": "60798", "entity name": "69SV 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 2 Hybrid", "plant state": "CA", "plant id": "61169", "generator id": "61169", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61169", "date": "2025-03", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Eland Solar & Storage Center, Phase 2 Hybrid", "name_short": "Eland Solar & Storage Center, Phase...", "owner": "69SV 8me LLC", "state": "california", "country": "usa", "lat": "35.198008", "long": "-117.994", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.198008+-117.994", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1760848348607594844", "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "https://x.com/Tesla_Megapack/status/1794120454883659833"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ridgely Energy Farm", "city": "", "id": "684", "external_id": "65445", "state": "tennessee", "country": "usa", "capacity_mwh": "", "estimate_mwh": "138", "power_mw": "69", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "684", "external_id": "65445", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ridgely Energy Farm", "external_id": "65445", "state": "tennessee", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Leeward Asset Management, LLC", "status": "planning", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RBESS": {"first": {"year": "2024", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Ridgely Energy Farm", "plant state": "TN", "plant id": "65445", "generator id": "RBESS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65445", "date": "2024-12", "mw": 50}, "first_month": "2023-05", "changes": [{"month": "2024-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-12", "to": "2025-03", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "3", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Ridgely Energy Farm", "plant state": "TN", "plant id": "65445", "generator id": "RBESS", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65445", "date": "2025-03", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Ridgely Energy Farm", "name_short": "Ridgely Energy Farm", "owner": "Leeward Asset Management, LLC", "state": "tennessee", "country": "usa", "lat": "36.55150401604119", "long": "-83.00609678539502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.55150401604119+-83.00609678539502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tidwell Prairie Storage 1", "city": "", "id": "983", "external_id": "66337", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Tidwell Prairie", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "983", "external_id": "66337", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Tidwell Prairie Storage 1", "external_id": "66337", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Tidwell Prairie", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SGES1": {"first": {"year": "2024", "month": "12", "entity id": "65427", "entity name": "Tidwell Prairie", "plant producer type": "IPP", "plant name": "Tidwell Prairie Storage 1", "plant state": "TX", "plant id": "66337", "generator id": "SGES1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66337", "date": "2024-12", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-12", "to": "2025-03", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "3", "entity id": "65427", "entity name": "Tidwell Prairie", "plant producer type": "IPP", "plant name": "Tidwell Prairie Storage 1", "plant state": "TX", "plant id": "66337", "generator id": "SGES1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66337", "date": "2025-03", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Tidwell Prairie Storage 1", "name_short": "Tidwell Prairie Storage 1", "owner": "Tidwell Prairie", "state": "texas", "country": "usa", "lat": "33.63689184072874", "long": "-95.1405985329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.63689184072874+-95.1405985329819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bexar ESS", "city": "", "id": "998", "external_id": "66400", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "998", "external_id": "66400", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bexar ESS", "external_id": "66400", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Bexar ESS, LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OCBEX": {"first": {"year": "2024", "month": "8", "entity id": "58489", "entity name": "OCI Solar Power", "plant producer type": "IPP", "plant name": "Bexar ESS", "plant state": "TX", "plant id": "66400", "generator id": "OCBEX", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66400", "date": "2024-08", "mw": 100}, "first_month": "2023-04", "changes": [{"month": "2023-09", "li": [{"name": "date", "from": "2024-08", "to": "2025-03", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "entity id", "from": "58489", "to": "66064", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "OCI Solar Power", "to": "Bexar ESS, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "3", "entity id": "66064", "entity name": "Bexar ESS, LLC", "plant producer type": "IPP", "plant name": "Bexar ESS", "plant state": "TX", "plant id": "66400", "generator id": "OCBEX", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66400", "date": "2025-03", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Bexar ESS", "name_short": "Bexar ESS", "owner": "Bexar ESS, LLC", "state": "texas", "country": "usa", "lat": "33.244802450183876", "long": "-94.98542795000252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.244802450183876+-94.98542795000252", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vermillion Rise Solar", "city": "", "id": "1024", "external_id": "65935", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Vermillion Rise Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1024", "external_id": "65935", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vermillion Rise Solar", "external_id": "65935", "state": "indiana", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Vermillion Rise Solar, LLC", "status": "planning", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT": {"first": {"year": "2025", "month": "3", "entity id": "65104", "entity name": "Vermillion Rise Solar, LLC", "plant producer type": "IPP", "plant name": "Vermillion Rise Solar", "plant state": "IN", "plant id": "65935", "generator id": "BAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65935", "date": "2025-03", "mw": 40}, "first_month": "2023-06", "changes": [], "current": {"year": "2025", "month": "3", "entity id": "65104", "entity name": "Vermillion Rise Solar, LLC", "plant producer type": "IPP", "plant name": "Vermillion Rise Solar", "plant state": "IN", "plant id": "65935", "generator id": "BAT", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65935", "date": "2025-03", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Vermillion Rise Solar", "name_short": "Vermillion Rise Solar", "owner": "Vermillion Rise Solar, LLC", "state": "indiana", "country": "usa", "lat": "41.46687023408578", "long": "-85.29278382472", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.46687023408578+-85.29278382472", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wimauma Storage", "city": "", "id": "1023", "external_id": "66640", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1023", "external_id": "66640", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Wimauma Storage", "external_id": "66640", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Tampa Electric Co", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-05", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2025", "month": "2", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Wimauma Storage", "plant state": "FL", "plant id": "66640", "generator id": "BESS1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66640", "date": "2025-02", "mw": 40}, "first_month": "2023-07", "changes": [{"month": "2024-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "2", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Wimauma Storage", "plant state": "FL", "plant id": "66640", "generator id": "BESS1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66640", "date": "2025-02", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-05"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-05", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "go_live": "0 ~ 2025-02", "go_live_year_int": 2025, "name": "Wimauma Storage", "name_short": "Wimauma", "owner": "Tampa Electric Co", "state": "florida", "country": "usa", "lat": "30.217739801403745", "long": "-82.085216763257", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.217739801403745+-82.085216763257", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Northern Orchard Solar PV, LLC", "city": "", "id": "1179", "external_id": "67039", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "184", "power_mw": "92", "customer": "", "owner": "Northern Orchard Solar PV, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1179", "external_id": "67039", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Northern Orchard Solar PV, LLC", "external_id": "67039", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 184, "power_mw": 92, "owner": "Northern Orchard Solar PV, LLC", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NOBAT": {"first": {"year": "2024", "month": "3", "entity id": "65947", "entity name": "Northern Orchard Solar PV, LLC", "plant producer type": "IPP", "plant name": "Northern Orchard Solar PV, LLC", "plant state": "CA", "plant id": "67039", "generator id": "NOBAT", "net summer capacity (mw)": "92", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67039", "date": "2024-03", "mw": 92}, "first_month": "2023-12", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-12", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-12", "to": "2025-02", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "2", "entity id": "65947", "entity name": "Northern Orchard Solar PV, LLC", "plant producer type": "IPP", "plant name": "Northern Orchard Solar PV, LLC", "plant state": "CA", "plant id": "67039", "generator id": "NOBAT", "net summer capacity (mw)": "92", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67039", "date": "2025-02", "mw": 92}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 92, "mwh_is_estimate": true, "mwh": 184, "mwh_estimate": 184, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "go_live": "0 ~ 2025-02", "go_live_year_int": 2025, "name": "Northern Orchard Solar PV, LLC", "name_short": "Northern Orchard Solar PV", "owner": "Northern Orchard Solar PV, LLC", "state": "california", "country": "usa", "lat": "41.01822925590127", "long": "-120.97859189749224", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01822925590127+-120.97859189749224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McFarland C", "city": "", "id": "1328", "external_id": "67498", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1328", "external_id": "67498", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McFarland C", "external_id": "67498", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MCFRC": {"first": {"year": "2025", "month": "2", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland C", "plant state": "AZ", "plant id": "67498", "generator id": "MCFRC", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67498", "date": "2025-02", "mw": 185}, "first_month": "2024-05", "changes": [], "current": {"year": "2025", "month": "2", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland C", "plant state": "AZ", "plant id": "67498", "generator id": "MCFRC", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67498", "date": "2025-02", "mw": 185}, "current_month": "2024-06", "dates": {"first_heard": "2024-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": true, "mwh": 370, "mwh_estimate": 370, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-05", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "month_disappeared": "", "go_live": "0 ~ 2025-02", "go_live_year_int": 2025, "name": "McFarland C", "name_short": "McFarland C", "owner": "AES Clean Energy", "state": "arizona", "country": "usa", "lat": "36.60539061449517", "long": "-110.060001670785", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.60539061449517+-110.060001670785", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aratina Solar Center 2", "city": "", "id": "161", "external_id": "64215", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "45MG 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "161", "external_id": "64215", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Aratina Solar Center 2", "external_id": "64215", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "45MG 8me LLC", "status": "planning", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"45MGB": {"first": {"year": "2023", "month": "6", "entity id": "63825", "entity name": "45MG 8me LLC", "plant producer type": "IPP", "plant name": "Aratina Solar Center 2", "plant state": "CA", "plant id": "64215", "generator id": "45MGB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64215", "date": "2023-06", "mw": 200}, "first_month": "2021-01", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2023-06", "to": "2024-06", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-03", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2025-03", "to": "2025-01", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "63825", "entity name": "45MG 8me LLC", "plant producer type": "IPP", "plant name": "Aratina Solar Center 2", "plant state": "CA", "plant id": "64215", "generator id": "45MGB", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64215", "date": "2025-01", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2021-01", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "Aratina Solar Center 2", "name_short": "Aratina Solar Center 2", "owner": "45MG 8me LLC", "state": "california", "country": "usa", "lat": "41.16655741320125", "long": "-121.16499897468609", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.16655741320125+-121.16499897468609", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES Waiawa Phase 2 Solar", "city": "", "id": "857", "external_id": "66066", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "857", "external_id": "66066", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES Waiawa Phase 2 Solar", "external_id": "66066", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "AES Distributed Energy", "status": "construction", "date_first_heard": "2022-12", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WAIBA": {"first": {"year": "2023", "month": "12", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Waiawa Phase 2 Solar", "plant state": "HI", "plant id": "66066", "generator id": "WAIBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66066", "date": "2023-12", "mw": 30}, "first_month": "2022-12", "changes": [{"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2024-10", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2024-10", "to": "2024-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-11", "to": "2025-01", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Waiawa Phase 2 Solar", "plant state": "HI", "plant id": "66066", "generator id": "WAIBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66066", "date": "2025-01", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2022-12", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-12", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "AES Waiawa Phase 2 Solar", "name_short": "AES Waiawa Phase 2 Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.406354683428763", "long": "-155.3642375459177", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.406354683428763+-155.3642375459177", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peregrine", "city": "San Diego", "id": "865", "external_id": "66286", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.692183", "long": "-117.13667", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/peregrine/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/", "link2": "", "link3": "", "link4": ""}, "internal_id": "865", "external_id": "66286", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peregrine Energy Storage LLC", "external_id": "66286", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Peregrine Energy Storage, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PERE1": {"first": {"year": "2024", "month": "8", "entity id": "65398", "entity name": "Peregrine Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Peregrine Energy Storage LLC", "plant state": "CA", "plant id": "66286", "generator id": "PERE1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66286", "date": "2024-08", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2023-10", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-08", "to": "2024-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2024-09", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-09", "to": "2024-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-10", "to": "2025-01", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "65398", "entity name": "Peregrine Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Peregrine Energy Storage LLC", "plant state": "CA", "plant id": "66286", "generator id": "PERE1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66286", "date": "2025-01", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "Peregrine Energy Storage LLC", "name_short": "Peregrine Energy Storage", "owner": "Peregrine Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.692183", "long": "-117.13667", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.692183+-117.13667", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Lake Mabel Storage", "city": "", "id": "1022", "external_id": "66641", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1022", "external_id": "66641", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lake Mabel Storage", "external_id": "66641", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Tampa Electric Co", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2024", "month": "12", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Lake Mabel Storage", "plant state": "FL", "plant id": "66641", "generator id": "BESS1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66641", "date": "2024-12", "mw": 40}, "first_month": "2023-07", "changes": [{"month": "2024-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-12", "to": "2025-01", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Lake Mabel Storage", "plant state": "FL", "plant id": "66641", "generator id": "BESS1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66641", "date": "2025-01", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "Lake Mabel Storage", "name_short": "Lake Mabel", "owner": "Tampa Electric Co", "state": "florida", "country": "usa", "lat": "30.181357961192568", "long": "-82.0795645724725", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.181357961192568+-82.0795645724725", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards", "city": "Edwards", "id": "98", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.413627", "long": "-88.058471", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, "internal_id": "98", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 37, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "Edwards", "name_short": "Edwards", "owner": "Vistra Corp", "state": "illinois", "country": "usa", "lat": "38.413627", "long": "-88.058471", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.413627+-88.058471", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["the last of 8 projects will be done in 2025, so most likely earlier"], "links": ["https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Havana", "city": "Havana", "id": "99", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.279711", "long": "-90.079133", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, "internal_id": "99", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 37, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "Havana", "name_short": "Havana", "owner": "Vistra Corp", "state": "illinois", "country": "usa", "lat": "40.279711", "long": "-90.079133", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.279711+-90.079133", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["the last of 8 projects will be done in 2025, so most likely earlier"], "links": ["https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "EEI/Joppa", "city": "Joppa", "id": "100", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.211346", "long": "-88.859049", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, "internal_id": "100", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 37, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "EEI/Joppa", "name_short": "EEI/Joppa", "owner": "Vistra Corp", "state": "illinois", "country": "usa", "lat": "37.211346", "long": "-88.859049", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:37.211346+-88.859049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["the last of 8 projects will be done in 2025, so most likely earlier"], "links": ["https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oneida Energy Storage Project", "city": "Haldimand County", "id": "866", "external_id": "", "state": "ontario", "country": "canada", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "NRStor", "owner": "Northland Power ** SNGRDC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "42.886859", "long": "-80.12224", "coords_hint": "3", "use_case": "", "notes": "The article mentions Jarvis in Haldimand County", "project_website": "https://www.snfuture.com/projects/oneida-energy-storage/", "link1": "https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/", "link2": "", "link3": "", "link4": ""}, "internal_id": "866", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "Oneida Energy Storage Project", "name_short": "Oneida", "owner": "Northland Power ** SNGRDC", "state": "ontario", "country": "canada", "lat": "42.886859", "long": "-80.12224", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.886859+-80.12224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["The article mentions Jarvis in Haldimand County"], "links": ["https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hot Pot", "city": "Humboldt County", "id": "107", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "1120", "estimate_mwh": "", "power_mw": "280", "customer": "", "owner": "NV Energy", "developer": "Primergy Solar (Quinbrook)", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.886191", "long": "-117.104592", "coords_hint": "0", "use_case": "350MW solar farm support", "notes": "in the planning doc the project name also includes iron pot 2 solar plant", "project_website": "", "link1": "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/2013178/510", "link3": "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/", "link4": ""}, "internal_id": "107", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 280, "mwh_is_estimate": false, "mwh": 1120, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2024Q4", "month_disappeared": "", "go_live": "0 ~ 2024Q4", "go_live_year_int": 2024, "name": "Hot Pot", "name_short": "Hot Pot", "owner": "NV Energy", "state": "nevada", "country": "usa", "lat": "40.886191", "long": "-117.104592", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.886191+-117.104592", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["in the planning doc the project name also includes iron pot 2 solar plant"], "links": ["https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "https://eplanning.blm.gov/eplanning-ui/project/2013178/510", "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Collie Battery Stage 1", "city": "", "id": "1174", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "877", "estimate_mwh": "", "power_mw": "219", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31604", "long": "116.289605", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "link2": "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/", "link3": "", "link4": ""}, "internal_id": "1174", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 219, "mwh_is_estimate": false, "mwh": 877, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "month_disappeared": "", "go_live": "0 ~ 2024Q4", "go_live_year_int": 2024, "name": "Collie Battery Stage 1", "name_short": "Collie Battery Stage 1", "owner": "neoen", "state": "western australia", "country": "australia", "lat": "-33.31604", "long": "116.289605", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.31604+116.289605", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 224, "notes_split": [""], "links": ["https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Rye Common", "city": "Farnham", "id": "410", "external_id": "7737", "state": "hampshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.25011", "long": "-0.87423", "coords_hint": "1", "use_case": "", "notes": "Phase II is 200m north-east of Phase I", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "link4": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"}, "internal_id": "410", "external_id": "7737", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rye Common", "external_id": "7737", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pulse Clean Energy", "status": "planning", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.248047", "long": "-0.87689", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7737", "Record Last Updated (dd/mm/yyyy)": "06/10/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rye Common", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Address": "Street Record, Rye Common Lane, Crondall, Farnham, Surrey", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DD", "X-coordinate": "478485", "Y-coordinate": "150474", "Planning Authority": "Hart District Council", "Planning Application Reference": "20/00651/FUL", "Appeal Reference": "PP-08735792", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "01/05/2020", "Appeal Lodged": "22/02/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "28/09/2021", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.248047", "long": "-0.87689", "status": "planning", "mw": 49, "ext_id": "7737"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Street Record, Rye Common Lane, Crondall, Farnham, Surrey", "to": "Street Record, Rye Common Lane, Crondall, Farnham, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Granted", "from": "", "to": "28/09/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/10/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/03/2020", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Harmony Energy Storage", "to": "Pulse Clean Energy", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7737", "Record Last Updated (dd/mm/yyyy)": "12/03/2020", "Operator (or Applicant)": "Pulse Clean Energy", "Site Name": "Rye Common", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7028", "Address": "Street Record, Rye Common Lane, Crondall, Farnham, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DD", "X-coordinate": "478485", "Y-coordinate": "150474", "Planning Authority": "Hart District Council", "Planning Application Reference": "20/00651/FUL", "Appeal Reference": "PP-08735792", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "01/05/2020", "Appeal Lodged": "22/02/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "28/09/2021", "Planning Permission Granted": "28/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.248047", "long": "-0.87689", "status": "planning", "mw": 49, "ext_id": "7737"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "month_disappeared": "", "go_live": "0 ~ 2024Q3", "go_live_year_int": 2024, "name": "Rye Common", "name_short": "Rye Common", "owner": "Pulse Clean Energy", "state": "south east", "country": "uk", "lat": "51.248047", "long": "-0.87689", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.248047+-0.87689", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Phase II is 200m north-east of Phase I"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hawthorn Pit", "city": "Murton", "id": "849", "external_id": "", "state": "county durham", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99.8", "power_mw": "49.9", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.80552", "long": "-1.40646", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, "internal_id": "849", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 49, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "month_disappeared": "", "go_live": "0 ~ 2024Q2", "go_live_year_int": 2024, "name": "Hawthorn Pit", "name_short": "Hawthorn Pit", "owner": "Harmony Energy Income Trust", "state": "county durham", "country": "uk", "lat": "54.80552", "long": "-1.40646", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.80552+-1.40646", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Failed Oct 2022 C share placement puts construction in doubt"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wormald Green", "city": "Harrogate", "id": "848", "external_id": "", "state": "yorkshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.07548", "long": "-1.52312", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, "internal_id": "848", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 33, "mwh_is_estimate": true, "mwh": 66, "mwh_estimate": 66, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "month_disappeared": "", "go_live": "0 ~ 2024Q1", "go_live_year_int": 2024, "name": "Wormald Green", "name_short": "Wormald Green", "owner": "Harmony Energy Income Trust", "state": "yorkshire", "country": "uk", "lat": "54.07548", "long": "-1.52312", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.07548+-1.52312", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Failed Oct 2022 C share placement puts construction in doubt"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Rexford Solar Farm", "city": "Tulare County", "id": "61", "external_id": "64633", "state": "california", "country": "usa", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "180", "customer": "8minute / Clean Power Alliance", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-11", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.853593", "long": "-119.051695", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "already a large solar farm visible on google maps, but the planning doc shows it will be on new locations between existing solar farm", "project_website": "https://www.8minute.com/energy-storage/", "link1": "https://www.energy-storage.news/california-community-energy-group-signs-ppa-for-400mw-540mwh-solar-plus-storage-plant/", "link2": "https://tularecounty.ca.gov/rma/index.cfm/planning-building/environmental-planning/environmental-impact-reports/rexford-solar-project-psp-19-073/", "link3": "", "link4": ""}, "internal_id": "61", "external_id": "64633", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rexford Solar Farm", "external_id": "64633", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 480, "power_mw": 240, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2021-06", "start_construction": "2023-07", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"20SDB": {"first": {"year": "2023", "month": "4", "entity id": "64247", "entity name": "20SD 8me LLC", "plant producer type": "IPP", "plant name": "Rexford Solar Farm", "plant state": "CA", "plant id": "64633", "generator id": "20SDB", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64633", "date": "2023-04", "mw": 300}, "first_month": "2021-06", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2023-04", "to": "2024-04", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-04", "to": "2024-12", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "64247", "to": "64904", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "20SD 8me LLC", "to": "AES Clean Energy", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 300, "to": 240, "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Rexford Solar Farm", "plant state": "CA", "plant id": "64633", "generator id": "20SDB", "net summer capacity (mw)": "240", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64633", "date": "2024-12", "mw": 240}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 240, "mwh_is_estimate": false, "mwh": 540, "mwh_estimate": 480, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-06", "start_construction": "2023-07", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Rexford Solar Farm", "name_short": "Rexford Solar Farm", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "35.853593", "long": "-119.051695", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.853593+-119.051695", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["already a large solar farm visible on google maps, but the planning doc shows it will be on new locations between existing solar farm"], "links": ["https://www.energy-storage.news/california-community-energy-group-signs-ppa-for-400mw-540mwh-solar-plus-storage-plant/", "https://tularecounty.ca.gov/rma/index.cfm/planning-building/environmental-planning/environmental-impact-reports/rexford-solar-project-psp-19-073/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Atlas", "city": "", "id": "145", "external_id": "63798", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "145", "external_id": "63798", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Atlas", "external_id": "63798", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "174 Power Global Corp.", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ATLB1": {"first": {"year": "2022", "month": "12", "entity id": "61222", "entity name": "174 Power Global Corp.", "plant producer type": "IPP", "plant name": "Atlas", "plant state": "AZ", "plant id": "63798", "generator id": "ATLB1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63798", "date": "2022-12", "mw": 300}, "first_month": "2020-09", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2022-12", "to": "2023-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "61222", "entity name": "174 Power Global Corp.", "plant producer type": "IPP", "plant name": "Atlas", "plant state": "AZ", "plant id": "63798", "generator id": "ATLB1", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63798", "date": "2024-12", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Atlas", "name_short": "Atlas", "owner": "174 Power Global Corp.", "state": "arizona", "country": "usa", "lat": "36.668428999999996", "long": "-109.885254", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.668428999999996+-109.885254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pure Hedge LLC", "city": "", "id": "207", "external_id": "50736", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Pure Hedge LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "207", "external_id": "50736", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pure Hedge LLC", "external_id": "50736", "state": "connecticut", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Pure Hedge LLC", "status": "construction", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FSS13": {"first": {"year": "2021", "month": "9", "entity id": "63599", "entity name": "Pure Hedge LLC", "plant producer type": "IPP", "plant name": "Pure Hedge LLC", "plant state": "CT", "plant id": "50736", "generator id": "FSS13", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "50736", "date": "2021-09", "mw": 20}, "first_month": "2021-03", "changes": [{"month": "2021-05", "li": [{"name": "date", "from": "2021-09", "to": "2022-01", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-01", "to": "2023-01", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2023-01", "to": "2024-12", "extra": "delayed by 23 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "63599", "entity name": "Pure Hedge LLC", "plant producer type": "IPP", "plant name": "Pure Hedge LLC", "plant state": "CT", "plant id": "50736", "generator id": "FSS13", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "50736", "date": "2024-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Pure Hedge LLC", "name_short": "Pure Hedge", "owner": "Pure Hedge LLC", "state": "connecticut", "country": "usa", "lat": "42.02877361713374", "long": "-72.12237892885304", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.02877361713374+-72.12237892885304", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barbers Point Solar, LLC", "city": "", "id": "217", "external_id": "64094", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Barbers Point Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "217", "external_id": "64094", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Barbers Point Solar, LLC", "external_id": "64094", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Barbers Point Solar, LLC", "status": "planning", "date_first_heard": "2020-11", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BPBA": {"first": {"year": "2023", "month": "12", "entity id": "63702", "entity name": "Barbers Point Solar, LLC", "plant producer type": "IPP", "plant name": "Barbers Point Solar, LLC", "plant state": "HI", "plant id": "64094", "generator id": "BPBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64094", "date": "2023-12", "mw": 15}, "first_month": "2020-11", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "63702", "entity name": "Barbers Point Solar, LLC", "plant producer type": "IPP", "plant name": "Barbers Point Solar, LLC", "plant state": "HI", "plant id": "64094", "generator id": "BPBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64094", "date": "2024-12", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2020-11", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2020-11", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Barbers Point Solar, LLC", "name_short": "Barbers Point Solar", "owner": "Barbers Point Solar, LLC", "state": "hawaii", "country": "usa", "lat": "19.47107604297876", "long": "-155.4112603661011", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.47107604297876+-155.4112603661011", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Portland ESS, LLC", "city": "", "id": "221", "external_id": "64616", "state": "maine", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "South Portland ESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "221", "external_id": "64616", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "South Portland ESS, LLC", "external_id": "64616", "state": "maine", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "South Portland ESS, LLC", "status": "planning", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "1", "entity id": "64233", "entity name": "South Portland ESS, LLC", "plant producer type": "IPP", "plant name": "South Portland ESS, LLC", "plant state": "ME", "plant id": "64616", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64616", "date": "2023-01", "mw": 10}, "first_month": "2021-06", "changes": [{"month": "2022-03", "li": [{"name": "date", "from": "2023-01", "to": "2023-06", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2024-02", "to": "2024-12", "extra": "delayed by 10 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64233", "entity name": "South Portland ESS, LLC", "plant producer type": "IPP", "plant name": "South Portland ESS, LLC", "plant state": "ME", "plant id": "64616", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64616", "date": "2024-12", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2021-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "South Portland ESS, LLC", "name_short": "South Portland ESS", "owner": "South Portland ESS, LLC", "state": "maine", "country": "usa", "lat": "45.15652305365124", "long": "-69.2043404959897", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:45.15652305365124+-69.2043404959897", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vonore Battery Energy Storage System", "city": "", "id": "240", "external_id": "64255", "state": "tennessee", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Tennessee Valley Authority", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "240", "external_id": "64255", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vonore Battery Energy Storage System", "external_id": "64255", "state": "tennessee", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Tennessee Valley Authority", "status": "construction", "date_first_heard": "2021-01", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"VBESS": {"first": {"year": "2022", "month": "7", "entity id": "18642", "entity name": "Tennessee Valley Authority", "plant producer type": "Electric Utility", "plant name": "Vonore Battery Energy Storage System", "plant state": "TN", "plant id": "64255", "generator id": "VBESS", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64255", "date": "2022-07", "mw": 20}, "first_month": "2021-01", "changes": [{"month": "2022-04", "li": [{"name": "date", "from": "2022-07", "to": "2023-08", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-08", "to": "2023-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-07", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-07", "to": "2024-12", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "18642", "entity name": "Tennessee Valley Authority", "plant producer type": "Electric Utility", "plant name": "Vonore Battery Energy Storage System", "plant state": "TN", "plant id": "64255", "generator id": "VBESS", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64255", "date": "2024-12", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-01", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Vonore Battery Energy Storage System", "name_short": "Vonore Battery", "owner": "Tennessee Valley Authority", "state": "tennessee", "country": "usa", "lat": "36.315642", "long": "-83.002733", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.315642+-83.002733", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scarlet Solar (CA)", "city": "", "id": "551", "external_id": "64908", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "EDP Renewables North America LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "551", "external_id": "64908", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Scarlet Solar (CA)", "external_id": "64908", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "EDP Renewables North America LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "2023-04", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2022", "month": "12", "entity id": "61785", "entity name": "EDP Renewables North America LLC", "plant producer type": "IPP", "plant name": "Scarlet Solar (CA)", "plant state": "CA", "plant id": "64908", "generator id": "GEN02", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "64908", "date": "2022-12", "mw": 40}, "first_month": "2021-11", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2022-12", "to": "2023-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2023-03", "to": "2023-08", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-08", "to": "2024-12", "extra": "delayed by 16 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-12", "to": "2023-12", "extra": "accelerated by 12 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2024-03", "to": "2024-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "61785", "entity name": "EDP Renewables North America LLC", "plant producer type": "IPP", "plant name": "Scarlet Solar (CA)", "plant state": "CA", "plant id": "64908", "generator id": "GEN02", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64908", "date": "2024-12", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "2023-04", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Scarlet Solar (CA)", "name_short": "Scarlet Solar (CA)", "owner": "EDP Renewables North America LLC", "state": "california", "country": "usa", "lat": "41.08497692668626", "long": "-121.416077894988", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.08497692668626+-121.416077894988", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "ENGIE Solidago Solar Project - Hybrid", "city": "", "id": "573", "external_id": "65304", "state": "delaware", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "ENGIE Solidago Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "573", "external_id": "65304", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "ENGIE Solidago Solar Project - Hybrid", "external_id": "65304", "state": "delaware", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "ENGIE Solidago Solar LLC", "status": "planning", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "5", "entity id": "64609", "entity name": "ENGIE Solidago Solar LLC", "plant producer type": "IPP", "plant name": "ENGIE Solidago Solar Project - Hybrid", "plant state": "DE", "plant id": "65304", "generator id": "BESS", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65304", "date": "2024-05", "mw": 12}, "first_month": "2022-02", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64609", "entity name": "ENGIE Solidago Solar LLC", "plant producer type": "IPP", "plant name": "ENGIE Solidago Solar Project - Hybrid", "plant state": "DE", "plant id": "65304", "generator id": "BESS", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65304", "date": "2024-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2022-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2022-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "ENGIE Solidago Solar Project - Hybrid", "name_short": "ENGIE Solidago Solar Project", "owner": "ENGIE Solidago Solar LLC", "state": "delaware", "country": "usa", "lat": "38.832789499158764", "long": "-75.52656676197225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.832789499158764+-75.52656676197225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lone Star Solar", "city": "", "id": "683", "external_id": "62235", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "132", "power_mw": "66", "customer": "", "owner": "Lone Star Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "683", "external_id": "62235", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lone Star Solar", "external_id": "62235", "state": "south carolina", "country": "usa", "mwh": 0, "estimate_mwh": 132, "power_mw": 66, "owner": "Lone Star Solar", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-08", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"50": {"first": {"year": "2023", "month": "12", "entity id": "61752", "entity name": "Lone Star Solar", "plant producer type": "IPP", "plant name": "Lone Star Solar", "plant state": "SC", "plant id": "62235", "generator id": "50", "net summer capacity (mw)": "66", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "62235", "date": "2023-12", "mw": 66}, "first_month": "2022-04", "changes": [{"month": "2023-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "61752", "entity name": "Lone Star Solar", "plant producer type": "IPP", "plant name": "Lone Star Solar", "plant state": "SC", "plant id": "62235", "generator id": "50", "net summer capacity (mw)": "66", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62235", "date": "2024-12", "mw": 66}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-08"}, "month_disappeared": ""}}, "mw": 66, "mwh_is_estimate": true, "mwh": 132, "mwh_estimate": 132, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-08", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Lone Star Solar", "name_short": "Lone Star Solar", "owner": "Lone Star Solar", "state": "south carolina", "country": "usa", "lat": "34.78959784072874", "long": "-79.6594265329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.78959784072874+-79.6594265329819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carina", "city": "", "id": "715", "external_id": "65589", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "715", "external_id": "65589", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Carina", "external_id": "65589", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CARNA": {"first": {"year": "2023", "month": "10", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Carina", "plant state": "TX", "plant id": "65589", "generator id": "CARNA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65589", "date": "2023-10", "mw": 150}, "first_month": "2022-05", "changes": [{"month": "2023-03", "li": [{"name": "date", "from": "2023-10", "to": "2024-06", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Carina", "plant state": "TX", "plant id": "65589", "generator id": "CARNA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65589", "date": "2024-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Carina", "name_short": "Carina", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.324054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.324054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Antlia", "city": "", "id": "720", "external_id": "65588", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "720", "external_id": "65588", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Antlia", "external_id": "65588", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ANTLA": {"first": {"year": "2023", "month": "10", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Antlia", "plant state": "TX", "plant id": "65588", "generator id": "ANTLA", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65588", "date": "2023-10", "mw": 70}, "first_month": "2022-05", "changes": [{"month": "2023-03", "li": [{"name": "date", "from": "2023-10", "to": "2024-06", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Antlia", "plant state": "TX", "plant id": "65588", "generator id": "ANTLA", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65588", "date": "2024-12", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Antlia", "name_short": "Antlia", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.23343799999999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.23343799999999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Zeya", "city": "", "id": "791", "external_id": "65880", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "791", "external_id": "65880", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Zeya", "external_id": "65880", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ZEYA": {"first": {"year": "2024", "month": "4", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Zeya", "plant state": "TX", "plant id": "65880", "generator id": "ZEYA", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65880", "date": "2024-04", "mw": 250}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-04", "to": "2024-12", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Zeya", "plant state": "TX", "plant id": "65880", "generator id": "ZEYA", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65880", "date": "2024-12", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Zeya", "name_short": "Zeya", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.39163256713626", "long": "-95.46555141629162", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.39163256713626+-95.46555141629162", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cachi", "city": "", "id": "792", "external_id": "65861", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "792", "external_id": "65861", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cachi", "external_id": "65861", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CACHI": {"first": {"year": "2024", "month": "3", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Cachi", "plant state": "TX", "plant id": "65861", "generator id": "CACHI", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65861", "date": "2024-03", "mw": 200}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-12", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Cachi", "plant state": "TX", "plant id": "65861", "generator id": "CACHI", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65861", "date": "2024-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Cachi", "name_short": "Cachi", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.322390103486484", "long": "-95.45465780673999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.322390103486484+-95.45465780673999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Castor", "city": "", "id": "793", "external_id": "65870", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "793", "external_id": "65870", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Castor", "external_id": "65870", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CASTR": {"first": {"year": "2024", "month": "5", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Castor", "plant state": "TX", "plant id": "65870", "generator id": "CASTR", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65870", "date": "2024-05", "mw": 200}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Castor", "plant state": "TX", "plant id": "65870", "generator id": "CASTR", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65870", "date": "2024-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Castor", "name_short": "Castor", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.255035819383764", "long": "-95.41803317206394", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.255035819383764+-95.41803317206394", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desna", "city": "", "id": "794", "external_id": "65876", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "794", "external_id": "65876", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desna", "external_id": "65876", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DESNA": {"first": {"year": "2024", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Desna", "plant state": "TX", "plant id": "65876", "generator id": "DESNA", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65876", "date": "2024-06", "mw": 200}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Desna", "plant state": "TX", "plant id": "65876", "generator id": "DESNA", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65876", "date": "2024-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Desna", "name_short": "Desna", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.1991708536329", "long": "-95.35625455449248", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.1991708536329+-95.35625455449248", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Avila", "city": "", "id": "796", "external_id": "65860", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "320", "power_mw": "160", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "796", "external_id": "65860", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Avila", "external_id": "65860", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 320, "power_mw": 160, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AVILA": {"first": {"year": "2024", "month": "2", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Avila", "plant state": "TX", "plant id": "65860", "generator id": "AVILA", "net summer capacity (mw)": "160", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65860", "date": "2024-02", "mw": 160}, "first_month": "2022-09", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-12", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Avila", "plant state": "TX", "plant id": "65860", "generator id": "AVILA", "net summer capacity (mw)": "160", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65860", "date": "2024-12", "mw": 160}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 160, "mwh_is_estimate": true, "mwh": 320, "mwh_estimate": 320, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Avila", "name_short": "Avila", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.15732436691591", "long": "-95.17702469775502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.15732436691591+-95.17702469775502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Salt City Solar Project - Hybrid", "city": "", "id": "977", "external_id": "65302", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Salt City Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "977", "external_id": "65302", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Salt City Solar Project - Hybrid", "external_id": "65302", "state": "ohio", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Salt City Solar LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "5", "entity id": "64607", "entity name": "Salt City Solar LLC", "plant producer type": "IPP", "plant name": "Salt City Solar Project - Hybrid", "plant state": "OH", "plant id": "65302", "generator id": "BESS", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65302", "date": "2024-05", "mw": 12}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64607", "entity name": "Salt City Solar LLC", "plant producer type": "IPP", "plant name": "Salt City Solar Project - Hybrid", "plant state": "OH", "plant id": "65302", "generator id": "BESS", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65302", "date": "2024-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Salt City Solar Project - Hybrid", "name_short": "Salt City Solar Project", "owner": "Salt City Solar LLC", "state": "ohio", "country": "usa", "lat": "41.15070000365377", "long": "-80.98233613582602", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.15070000365377+-80.98233613582602", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 3 BESS 2", "city": "", "id": "993", "external_id": "66293", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "993", "external_id": "66293", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 3 BESS 2", "external_id": "66293", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A3BS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 3 BESS 2", "plant state": "TX", "plant id": "66293", "generator id": "A3BS2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66293", "date": "2024-05", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 3 BESS 2", "plant state": "TX", "plant id": "66293", "generator id": "A3BS2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66293", "date": "2024-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Alamo 3 BESS 2", "name_short": "Alamo 3 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.255035819383764", "long": "-95.41803317206394", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.255035819383764+-95.41803317206394", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 4 BESS", "city": "", "id": "994", "external_id": "66294", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "994", "external_id": "66294", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 4 BESS", "external_id": "66294", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A4BS1": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 4 BESS", "plant state": "TX", "plant id": "66294", "generator id": "A4BS1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66294", "date": "2024-05", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 4 BESS", "plant state": "TX", "plant id": "66294", "generator id": "A4BS1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66294", "date": "2024-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Alamo 4 BESS", "name_short": "Alamo 4", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.1991708536329", "long": "-95.35625455449248", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.1991708536329+-95.35625455449248", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 5 BESS 1", "city": "", "id": "995", "external_id": "66295", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "995", "external_id": "66295", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 5 BESS 1", "external_id": "66295", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A5BS1": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 5 BESS 1", "plant state": "TX", "plant id": "66295", "generator id": "A5BS1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66295", "date": "2024-05", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 5 BESS 1", "plant state": "TX", "plant id": "66295", "generator id": "A5BS1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66295", "date": "2024-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Alamo 5 BESS 1", "name_short": "Alamo 5 BESS 1", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.164054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.164054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alamo 5 BESS 2", "city": "", "id": "996", "external_id": "66296", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "996", "external_id": "66296", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Alamo 5 BESS 2", "external_id": "66296", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Consolidated Edison Development Inc.", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"A5BS2": {"first": {"year": "2024", "month": "5", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 5 BESS 2", "plant state": "TX", "plant id": "66296", "generator id": "A5BS2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66296", "date": "2024-05", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "56769", "entity name": "Consolidated Edison Development Inc.", "plant producer type": "IPP", "plant name": "Alamo 5 BESS 2", "plant state": "TX", "plant id": "66296", "generator id": "A5BS2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66296", "date": "2024-12", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Alamo 5 BESS 2", "name_short": "Alamo 5 BESS 2", "owner": "Consolidated Edison Development Inc.", "state": "texas", "country": "usa", "lat": "33.15732436691591", "long": "-95.17702469775502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.15732436691591+-95.17702469775502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Powells Creek Solar - Hybrid", "city": "", "id": "1005", "external_id": "65305", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Powells Creek Farm Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1005", "external_id": "65305", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Powells Creek Solar - Hybrid", "external_id": "65305", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 34, "power_mw": 17, "owner": "Powells Creek Farm Solar, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "5", "entity id": "64610", "entity name": "Powells Creek Farm Solar, LLC", "plant producer type": "IPP", "plant name": "Powells Creek Solar - Hybrid", "plant state": "VA", "plant id": "65305", "generator id": "BESS", "net summer capacity (mw)": "17.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65305", "date": "2024-05", "mw": 17}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64610", "entity name": "Powells Creek Farm Solar, LLC", "plant producer type": "IPP", "plant name": "Powells Creek Solar - Hybrid", "plant state": "VA", "plant id": "65305", "generator id": "BESS", "net summer capacity (mw)": "17.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65305", "date": "2024-12", "mw": 17}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 17, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Powells Creek Solar - Hybrid", "name_short": "Powells Creek Solar", "owner": "Powells Creek Farm Solar, LLC", "state": "virginia", "country": "usa", "lat": "38.270223", "long": "-77.80875", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.270223+-77.80875", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sunnybrook Solar Project - Hybrid", "city": "", "id": "1006", "external_id": "65307", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Sunnybrook Farm Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1006", "external_id": "65307", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sunnybrook Solar Project - Hybrid", "external_id": "65307", "state": "virginia", "country": "usa", "mwh": 0, "estimate_mwh": 24, "power_mw": 12, "owner": "Sunnybrook Farm Solar, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SUNB": {"first": {"year": "2024", "month": "5", "entity id": "64612", "entity name": "Sunnybrook Farm Solar, LLC", "plant producer type": "IPP", "plant name": "Sunnybrook Solar Project - Hybrid", "plant state": "VA", "plant id": "65307", "generator id": "SUNB", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65307", "date": "2024-05", "mw": 12}, "first_month": "2023-03", "changes": [{"month": "2024-02", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64612", "entity name": "Sunnybrook Farm Solar, LLC", "plant producer type": "IPP", "plant name": "Sunnybrook Solar Project - Hybrid", "plant state": "VA", "plant id": "65307", "generator id": "SUNB", "net summer capacity (mw)": "12.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65307", "date": "2024-12", "mw": 12}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 12, "mwh_is_estimate": true, "mwh": 24, "mwh_estimate": 24, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Sunnybrook Solar Project - Hybrid", "name_short": "Sunnybrook Solar Project", "owner": "Sunnybrook Farm Solar, LLC", "state": "virginia", "country": "usa", "lat": "38.28576246015096", "long": "-77.8495402432575", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.28576246015096+-77.8495402432575", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hanford BESS", "city": "", "id": "1013", "external_id": "66660", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Hanford BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1013", "external_id": "66660", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lead BESS 1", "external_id": "66660", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 198, "power_mw": 99, "owner": "Hanford BESS LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HAN": {"first": {"year": "2024", "month": "12", "entity id": "65680", "entity name": "Hanford BESS LLC", "plant producer type": "IPP", "plant name": "Hanford BESS", "plant state": "CA", "plant id": "66660", "generator id": "HAN", "net summer capacity (mw)": "99.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66660", "date": "2024-12", "mw": 99}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "plant name", "from": "Hanford BESS", "to": "Lead BESS 1", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "65680", "entity name": "Hanford BESS LLC", "plant producer type": "IPP", "plant name": "Lead BESS 1", "plant state": "CA", "plant id": "66660", "generator id": "HAN", "net summer capacity (mw)": "99.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66660", "date": "2024-12", "mw": 99}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 99, "mwh_is_estimate": true, "mwh": 198, "mwh_estimate": 198, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Lead BESS 1", "name_short": "Lead BESS 1", "owner": "Hanford BESS LLC", "state": "california", "country": "usa", "lat": "41.05310153848376", "long": "-121.35059853169716", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.05310153848376+-121.35059853169716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Henrietta BESS", "city": "", "id": "1014", "external_id": "66661", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Henrietta BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1014", "external_id": "66661", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Electrolyte BESS", "external_id": "66661", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 198, "power_mw": 99, "owner": "Henrietta BESS LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HEN": {"first": {"year": "2024", "month": "12", "entity id": "65681", "entity name": "Henrietta BESS LLC", "plant producer type": "IPP", "plant name": "Henrietta BESS", "plant state": "CA", "plant id": "66661", "generator id": "HEN", "net summer capacity (mw)": "99.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66661", "date": "2024-12", "mw": 99}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "plant name", "from": "Henrietta BESS", "to": "Electrolyte BESS", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "65681", "entity name": "Henrietta BESS LLC", "plant producer type": "IPP", "plant name": "Electrolyte BESS", "plant state": "CA", "plant id": "66661", "generator id": "HEN", "net summer capacity (mw)": "99.4", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66661", "date": "2024-12", "mw": 99}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 99, "mwh_is_estimate": true, "mwh": 198, "mwh_estimate": 198, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Electrolyte BESS", "name_short": "Electrolyte", "owner": "Henrietta BESS LLC", "state": "california", "country": "usa", "lat": "41.01996289624012", "long": "-121.3334228353925", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.01996289624012+-121.3334228353925", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Malaga BESS", "city": "", "id": "1015", "external_id": "66659", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "194", "power_mw": "97", "customer": "", "owner": "Malaga BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1015", "external_id": "66659", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Acid BESS", "external_id": "66659", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 194, "power_mw": 97, "owner": "Malaga BESS LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MAL": {"first": {"year": "2024", "month": "12", "entity id": "65678", "entity name": "Malaga BESS LLC", "plant producer type": "IPP", "plant name": "Malaga BESS", "plant state": "CA", "plant id": "66659", "generator id": "MAL", "net summer capacity (mw)": "97", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66659", "date": "2024-12", "mw": 97}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "plant name", "from": "Malaga BESS", "to": "Acid BESS", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "65678", "entity name": "Malaga BESS LLC", "plant producer type": "IPP", "plant name": "Acid BESS", "plant state": "CA", "plant id": "66659", "generator id": "MAL", "net summer capacity (mw)": "97", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66659", "date": "2024-12", "mw": 97}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 97, "mwh_is_estimate": true, "mwh": 194, "mwh_estimate": 194, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Acid BESS", "name_short": "Acid", "owner": "Malaga BESS LLC", "state": "california", "country": "usa", "lat": "40.992677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.992677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Inland Empire Energy Storage", "city": "", "id": "1016", "external_id": "66726", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1016", "external_id": "66726", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Inland Empire Energy Storage", "external_id": "66726", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 140, "power_mw": 70, "owner": "Strata Manager, LLC", "status": "planning", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"IEESS": {"first": {"year": "2024", "month": "6", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Inland Empire Energy Storage", "plant state": "CA", "plant id": "66726", "generator id": "IEESS", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66726", "date": "2024-06", "mw": 70}, "first_month": "2023-07", "changes": [{"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-12", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "64778", "entity name": "Strata Manager, LLC", "plant producer type": "IPP", "plant name": "Inland Empire Energy Storage", "plant state": "CA", "plant id": "66726", "generator id": "IEESS", "net summer capacity (mw)": "70", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66726", "date": "2024-12", "mw": 70}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": null}, "month_disappeared": ""}}, "mw": 70, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2023-07", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Inland Empire Energy Storage", "name_short": "Inland Empire", "owner": "Strata Manager, LLC", "state": "california", "country": "usa", "lat": "40.97811640952314", "long": "-121.253078416855", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.97811640952314+-121.253078416855", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "BIA BESS", "city": "", "id": "1019", "external_id": "66662", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "64", "power_mw": "32", "customer": "", "owner": "Hanford BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1019", "external_id": "66662", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lead BESS 2", "external_id": "66662", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 64, "power_mw": 32, "owner": "Hanford BESS LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BIA": {"first": {"year": "2024", "month": "12", "entity id": "65680", "entity name": "Hanford BESS LLC", "plant producer type": "IPP", "plant name": "BIA BESS", "plant state": "CA", "plant id": "66662", "generator id": "BIA", "net summer capacity (mw)": "32", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66662", "date": "2024-12", "mw": 32}, "first_month": "2023-07", "changes": [{"month": "2023-08", "li": [{"name": "plant name", "from": "BIA BESS", "to": "Lead BESS 2", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "65680", "entity name": "Hanford BESS LLC", "plant producer type": "IPP", "plant name": "Lead BESS 2", "plant state": "CA", "plant id": "66662", "generator id": "BIA", "net summer capacity (mw)": "32", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66662", "date": "2024-12", "mw": 32}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 32, "mwh_is_estimate": true, "mwh": 64, "mwh_estimate": 64, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Lead BESS 2", "name_short": "Lead BESS 2", "owner": "Hanford BESS LLC", "state": "california", "country": "usa", "lat": "41.05531129522627", "long": "-121.09271867944766", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.05531129522627+-121.09271867944766", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pike County Energy Storage", "city": "", "id": "1045", "external_id": "66881", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Indianapolis Power & Light Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1045", "external_id": "66881", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pike County Energy Storage", "external_id": "66881", "state": "indiana", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Indianapolis Power & Light Co", "status": "construction", "date_first_heard": "2023-09", "start_construction": "2024-05", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT2": {"first": {"year": "2024", "month": "12", "entity id": "9273", "entity name": "Indianapolis Power & Light Co", "plant producer type": "Electric Utility", "plant name": "Pike County Energy Storage", "plant state": "IN", "plant id": "66881", "generator id": "BAT2", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66881", "date": "2024-12", "mw": 200}, "first_month": "2023-09", "changes": [{"month": "2024-03", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "12", "entity id": "9273", "entity name": "Indianapolis Power & Light Co", "plant producer type": "Electric Utility", "plant name": "Pike County Energy Storage", "plant state": "IN", "plant id": "66881", "generator id": "BAT2", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66881", "date": "2024-12", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": "2024-05"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "2024-05", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Pike County Energy Storage", "name_short": "Pike County", "owner": "Indianapolis Power & Light Co", "state": "indiana", "country": "usa", "lat": "41.535135", "long": "-85.332338", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.535135+-85.332338", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scarlet II Hybrid", "city": "", "id": "1177", "external_id": "66951", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "EDPR Scarlet II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1177", "external_id": "66951", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Scarlet II Hybrid", "external_id": "66951", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "EDPR Scarlet II LLC", "status": "planning", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN04": {"first": {"year": "2024", "month": "6", "entity id": "65859", "entity name": "EDPR Scarlet II LLC", "plant producer type": "IPP", "plant name": "Scarlet II Hybrid", "plant state": "CA", "plant id": "66951", "generator id": "GEN04", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66951", "date": "2024-06", "mw": 150}, "first_month": "2023-10", "changes": [{"month": "2023-12", "li": [{"name": "date", "from": "2024-06", "to": "2024-10", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-10", "to": "2024-12", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "65859", "entity name": "EDPR Scarlet II LLC", "plant producer type": "IPP", "plant name": "Scarlet II Hybrid", "plant state": "CA", "plant id": "66951", "generator id": "GEN04", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66951", "date": "2024-12", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Scarlet II Hybrid", "name_short": "Scarlet II", "owner": "EDPR Scarlet II LLC", "state": "california", "country": "usa", "lat": "40.88482600365377", "long": "-121.12724013582601", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.88482600365377+-121.12724013582601", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yuma Solar + Storage", "city": "", "id": "1333", "external_id": "67321", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "134", "power_mw": "67", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1333", "external_id": "67321", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Yuma Solar + Storage", "external_id": "67321", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 134, "power_mw": 67, "owner": "Invenergy Services LLC", "status": "planning", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2024", "month": "5", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Yuma Solar + Storage", "plant state": "AZ", "plant id": "67321", "generator id": "BESS1", "net summer capacity (mw)": "67", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67321", "date": "2024-05", "mw": 67}, "first_month": "2024-04", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-12", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "12", "entity id": "49893", "entity name": "Invenergy Services LLC", "plant producer type": "IPP", "plant name": "Yuma Solar + Storage", "plant state": "AZ", "plant id": "67321", "generator id": "BESS1", "net summer capacity (mw)": "67", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "67321", "date": "2024-12", "mw": 67}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 67, "mwh_is_estimate": true, "mwh": 134, "mwh_estimate": 134, "status": "planning", "status_class": "", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Yuma Solar + Storage", "name_short": "Yuma Solar +", "owner": "Invenergy Services LLC", "state": "arizona", "country": "usa", "lat": "36.37649285870876", "long": "-109.95931494178886", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.37649285870876+-109.95931494178886", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mamm Creek", "city": "", "id": "1344", "external_id": "67322", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1344", "external_id": "67322", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mamm Creek", "external_id": "67322", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MCESS": {"first": {"year": "2024", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Mamm Creek", "plant state": "CO", "plant id": "67322", "generator id": "MCESS", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67322", "date": "2024-12", "mw": 10}, "first_month": "2024-04", "changes": [], "current": {"year": "2024", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Mamm Creek", "plant state": "CO", "plant id": "67322", "generator id": "MCESS", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67322", "date": "2024-12", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Mamm Creek", "name_short": "Mamm Creek", "owner": "AES Clean Energy", "state": "colorado", "country": "usa", "lat": "40.79235349473758", "long": "-102.664760144945", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.79235349473758+-102.664760144945", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ville-sur-Haine", "city": "", "id": "1393", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Eneco", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.47647", "long": "4.077998", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1393", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Ville-sur-Haine", "name_short": "Ville-sur-Haine", "owner": "Eneco", "state": "", "country": "belgium", "lat": "50.47647", "long": "4.077998", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.47647+4.077998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hale Kuawehi Solar Hybrid", "city": "", "id": "214", "external_id": "62529", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Hale Kuawehi Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "214", "external_id": "62529", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hale Kuawehi Solar Hybrid", "external_id": "62529", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Hale Kuawehi Solar LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "", "start_estimated": "2024-11", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HKBA": {"first": {"year": "2022", "month": "12", "entity id": "62008", "entity name": "Hale Kuawehi Solar LLC", "plant producer type": "IPP", "plant name": "Hale Kuawehi Solar Hybrid", "plant state": "HI", "plant id": "62529", "generator id": "HKBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62529", "date": "2022-12", "mw": 30}, "first_month": "2020-09", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-12", "to": "2023-10", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2023-10", "to": "2024-11", "extra": "delayed by 13 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "11", "entity id": "62008", "entity name": "Hale Kuawehi Solar LLC", "plant producer type": "IPP", "plant name": "Hale Kuawehi Solar Hybrid", "plant state": "HI", "plant id": "62529", "generator id": "HKBA", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62529", "date": "2024-11", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-02"}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-02", "start_operation": "", "start_estimated": "2024-11", "month_disappeared": "", "go_live": "0 ~ 2024-11", "go_live_year_int": 2024, "name": "Hale Kuawehi Solar Hybrid", "name_short": "Hale Kuawehi Solar", "owner": "Hale Kuawehi Solar LLC", "state": "hawaii", "country": "usa", "lat": "19.509130896240123", "long": "-155.5469088353925", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.509130896240123+-155.5469088353925", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ho'Ohana Solar 1", "city": "", "id": "212", "external_id": "63723", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "104", "power_mw": "52", "customer": "", "owner": "Ho'Ohana Solar 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "212", "external_id": "63723", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ho'Ohana Solar 1", "external_id": "63723", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 104, "power_mw": 52, "owner": "Ho'Ohana Solar 1 LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HESS1": {"first": {"year": "2022", "month": "9", "entity id": "63416", "entity name": "Ho'Ohana Solar 1 LLC", "plant producer type": "IPP", "plant name": "Ho'Ohana Solar 1", "plant state": "HI", "plant id": "63723", "generator id": "HESS1", "net summer capacity (mw)": "52", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63723", "date": "2022-09", "mw": 52}, "first_month": "2020-09", "changes": [{"month": "2021-11", "li": [{"name": "date", "from": "2022-09", "to": "2023-08", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2022-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2024-10", "extra": "delayed by 14 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "10", "entity id": "63416", "entity name": "Ho'Ohana Solar 1 LLC", "plant producer type": "IPP", "plant name": "Ho'Ohana Solar 1", "plant state": "HI", "plant id": "63723", "generator id": "HESS1", "net summer capacity (mw)": "52", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "63723", "date": "2024-10", "mw": 52}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-10"}, "month_disappeared": ""}}, "mw": 52, "mwh_is_estimate": true, "mwh": 104, "mwh_estimate": 104, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-10", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "go_live": "0 ~ 2024-10", "go_live_year_int": 2024, "name": "Ho'Ohana Solar 1", "name_short": "Ho'Ohana Solar 1", "owner": "Ho'Ohana Solar 1 LLC", "state": "hawaii", "country": "usa", "lat": "19.57422674385328", "long": "-155.56531208764", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.57422674385328+-155.56531208764", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bright Arrow Solar, LLC", "city": "", "id": "1030", "external_id": "66688", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "206", "power_mw": "103", "customer": "", "owner": "Bright Arrow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1030", "external_id": "66688", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bright Arrow Solar, LLC", "external_id": "66688", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 206, "power_mw": 103, "owner": "Bright Arrow Solar, LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BASS1": {"first": {"year": "2024", "month": "5", "entity id": "65694", "entity name": "Bright Arrow Solar, LLC", "plant producer type": "IPP", "plant name": "Bright Arrow Solar, LLC", "plant state": "TX", "plant id": "66688", "generator id": "BASS1", "net summer capacity (mw)": "103.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66688", "date": "2024-05", "mw": 103}, "first_month": "2023-07", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-05", "to": "2024-10", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "10", "entity id": "65694", "entity name": "Bright Arrow Solar, LLC", "plant producer type": "IPP", "plant name": "Bright Arrow Solar, LLC", "plant state": "TX", "plant id": "66688", "generator id": "BASS1", "net summer capacity (mw)": "103.6", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66688", "date": "2024-10", "mw": 103}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 103, "mwh_is_estimate": true, "mwh": 206, "mwh_estimate": 206, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "go_live": "0 ~ 2024-10", "go_live_year_int": 2024, "name": "Bright Arrow Solar, LLC", "name_short": "Bright Arrow Solar", "owner": "Bright Arrow Solar, LLC", "state": "texas", "country": "usa", "lat": "33.454054", "long": "-95.333438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.454054+-95.333438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "GulfStar Power, LLC", "city": "", "id": "1053", "external_id": "66871", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "GulfStar Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1053", "external_id": "66871", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "GulfStar Power, LLC", "external_id": "66871", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "GulfStar Power, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "6", "entity id": "65805", "entity name": "GulfStar Power, LLC", "plant producer type": "IPP", "plant name": "GulfStar Power, LLC", "plant state": "TX", "plant id": "66871", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66871", "date": "2024-06", "mw": 300}, "first_month": "2023-09", "changes": [{"month": "2024-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-06", "to": "2024-10", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "10", "entity id": "65805", "entity name": "GulfStar Power, LLC", "plant producer type": "IPP", "plant name": "GulfStar Power, LLC", "plant state": "TX", "plant id": "66871", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66871", "date": "2024-10", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "go_live": "0 ~ 2024-10", "go_live_year_int": 2024, "name": "GulfStar Power, LLC", "name_short": "GulfStar Power", "owner": "GulfStar Power, LLC", "state": "texas", "country": "usa", "lat": "33.319757178933756", "long": "-95.37101035188054", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.319757178933756+-95.37101035188054", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ables Springs Solar & Storage", "city": "", "id": "1059", "external_id": "66905", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Ables Springs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1059", "external_id": "66905", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ables Springs Solar & Storage", "external_id": "66905", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Ables Springs Solar, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "10", "entity id": "65819", "entity name": "Ables Springs Solar, LLC", "plant producer type": "IPP", "plant name": "Ables Springs Solar & Storage", "plant state": "TX", "plant id": "66905", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66905", "date": "2024-10", "mw": 100}, "first_month": "2023-09", "changes": [{"month": "2024-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "10", "entity id": "65819", "entity name": "Ables Springs Solar, LLC", "plant producer type": "IPP", "plant name": "Ables Springs Solar & Storage", "plant state": "TX", "plant id": "66905", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66905", "date": "2024-10", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-10", "month_disappeared": "", "go_live": "0 ~ 2024-10", "go_live_year_int": 2024, "name": "Ables Springs Solar & Storage", "name_short": "Ables Springs Solar &", "owner": "Ables Springs Solar, LLC", "state": "texas", "country": "usa", "lat": "33.361966935676264", "long": "-94.99002315814404", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.361966935676264+-94.99002315814404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eland Solar", "city": "Kern County", "id": "62", "external_id": "61168", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "8minute / Capital Dynamics / LADWP", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-22", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.198008", "long": "-117.991201", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "location from planning doc ** partially online in 2022, fully in 2023", "project_website": "", "link1": "https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "link2": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link3": "", "link4": ""}, "internal_id": "62", "external_id": "61168", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eland Solar & Storage Center, Phase 1 Hybrid", "external_id": "61168", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "68SF 8me LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-01", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61168": {"first": {"year": "2022", "month": "11", "entity id": "60797", "entity name": "68SF 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 1 Hybrid", "plant state": "CA", "plant id": "61168", "generator id": "61168", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61168", "date": "2022-11", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-11", "to": "2023-07", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-03", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-11", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-11", "to": "2024-09", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "60797", "entity name": "68SF 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 1 Hybrid", "plant state": "CA", "plant id": "61168", "generator id": "61168", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "61168", "date": "2024-09", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-01", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Eland Solar & Storage Center, Phase 1 Hybrid", "name_short": "Eland Solar & Storage Center, Phase...", "owner": "68SF 8me LLC", "state": "california", "country": "usa", "lat": "35.198008", "long": "-117.991201", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.198008+-117.991201", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from planning doc ", " partially online in 2022, fully in 2023"], "links": ["https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "https://x.com/Tesla_Megapack/status/1794120454883659833"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Noosa Energy Storage LLC", "city": "", "id": "173", "external_id": "64531", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Noosa Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "173", "external_id": "64531", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Noosa Energy Storage LLC", "external_id": "64531", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 198, "power_mw": 99, "owner": "Engie North America", "status": "construction", "date_first_heard": "2021-04", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KOV4A": {"first": {"year": "2023", "month": "10", "entity id": "64164", "entity name": "Noosa Energy Storage LLC", "plant producer type": "IPP", "plant name": "Noosa Energy Storage LLC", "plant state": "CA", "plant id": "64531", "generator id": "KOV4A", "net summer capacity (mw)": "99", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64531", "date": "2023-10", "mw": 99}, "first_month": "2021-04", "changes": [{"month": "2023-06", "li": [{"name": "entity id", "from": "64164", "to": "63883", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Noosa Energy Storage LLC", "to": "Broad Reach Power", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-10", "to": "2024-09", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "9", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Noosa Energy Storage LLC", "plant state": "CA", "plant id": "64531", "generator id": "KOV4A", "net summer capacity (mw)": "99", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "64531", "date": "2024-09", "mw": 99}, "current_month": "2024-06", "dates": {"first_heard": "2021-04", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 99, "mwh_is_estimate": true, "mwh": 198, "mwh_estimate": 198, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-04", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Noosa Energy Storage LLC", "name_short": "Noosa Energy Storage", "owner": "Engie North America", "state": "california", "country": "usa", "lat": "40.956019499158764", "long": "-121.42113276197225", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.956019499158764+-121.42113276197225", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Painter Energy Storage", "city": "", "id": "182", "external_id": "62729", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Painter Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "182", "external_id": "62729", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Painter Energy Storage", "external_id": "62729", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Painter Energy Storage, LLC", "status": "construction", "date_first_heard": "2021-03", "start_construction": "2022-06", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PAIN1": {"first": {"year": "2021", "month": "12", "entity id": "62646", "entity name": "Painter Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Painter Energy Storage", "plant state": "CA", "plant id": "62729", "generator id": "PAIN1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62729", "date": "2021-12", "mw": 40}, "first_month": "2021-03", "changes": [{"month": "2021-08", "li": [{"name": "date", "from": "2021-12", "to": "2022-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "date", "from": "2022-09", "to": "2022-07", "extra": "accelerated by 2 months", "change_type": "timing"}, {"name": "mw", "from": 40, "to": 10, "extra": "", "change_type": "misc"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-07", "to": "2022-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-08", "to": "2023-03", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-04", "to": "2023-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-08", "to": "2023-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-07", "to": "2024-09", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "62646", "entity name": "Painter Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Painter Energy Storage", "plant state": "CA", "plant id": "62729", "generator id": "PAIN1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62729", "date": "2024-09", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2021-03", "start_construction": "2022-06"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-03", "start_construction": "2022-06", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Painter Energy Storage", "name_short": "Painter", "owner": "Painter Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.24258519146767", "long": "-121.13500953314751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.24258519146767+-121.13500953314751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AVEP BESS", "city": "", "id": "700", "external_id": "65591", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "252", "power_mw": "126", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "700", "external_id": "65591", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AVEP BESS", "external_id": "65591", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 252, "power_mw": 126, "owner": "Leeward Asset Management, LLC", "status": "construction", "date_first_heard": "2022-05", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AVEPB": {"first": {"year": "2023", "month": "5", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "AVEP BESS", "plant state": "CA", "plant id": "65591", "generator id": "AVEPB", "net summer capacity (mw)": "126", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65591", "date": "2023-05", "mw": 126}, "first_month": "2022-05", "changes": [{"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2024-06", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-06", "to": "2024-09", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "AVEP BESS", "plant state": "CA", "plant id": "65591", "generator id": "AVEPB", "net summer capacity (mw)": "126", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65591", "date": "2024-09", "mw": 126}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": null}, "month_disappeared": ""}}, "mw": 126, "mwh_is_estimate": true, "mwh": 252, "mwh_estimate": 252, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "AVEP BESS", "name_short": "AVEP", "owner": "Leeward Asset Management, LLC", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Placerita ESS", "city": "", "id": "956", "external_id": "66462", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "956", "external_id": "66462", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Placerita ESS", "external_id": "66462", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "Terra-Gen Operating Co-BESS 2", "status": "construction", "date_first_heard": "2023-04", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN1": {"first": {"year": "2024", "month": "2", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Placerita ESS", "plant state": "CA", "plant id": "66462", "generator id": "GEN1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66462", "date": "2024-02", "mw": 80}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity id", "from": "64287", "to": "65552", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Terra-Gen Operating Co-BESS", "to": "Terra-Gen Operating Co-BESS 2", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-09", "extra": "delayed by 7 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Placerita ESS", "plant state": "CA", "plant id": "66462", "generator id": "GEN1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66462", "date": "2024-09", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-04", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Placerita ESS", "name_short": "Placerita ESS", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "40.902031888219526", "long": "-121.22835705730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.902031888219526+-121.22835705730502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sagebrush Solar 2 ESS 59", "city": "", "id": "1180", "external_id": "66950", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "118", "power_mw": "59", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1180", "external_id": "66950", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sagebrush Solar 2 ESS 59", "external_id": "66950", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 118, "power_mw": 59, "owner": "Terra-Gen Operating Co-BESS 2", "status": "construction", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush Solar 2 ESS 59", "plant state": "CA", "plant id": "66950", "generator id": "1", "net summer capacity (mw)": "59", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66950", "date": "2024-09", "mw": 59}, "first_month": "2023-10", "changes": [], "current": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush Solar 2 ESS 59", "plant state": "CA", "plant id": "66950", "generator id": "1", "net summer capacity (mw)": "59", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66950", "date": "2024-09", "mw": 59}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 59, "mwh_is_estimate": true, "mwh": 118, "mwh_estimate": 118, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Sagebrush Solar 2 ESS 59", "name_short": "Sagebrush Solar 2 ESS 59", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.140049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.140049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sagebrush Solar 2 ESS 40", "city": "", "id": "1182", "external_id": "66949", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1182", "external_id": "66949", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sagebrush Solar 2 ESS 40", "external_id": "66949", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Terra-Gen Operating Co-BESS 2", "status": "construction", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush Solar 2 ESS 40", "plant state": "CA", "plant id": "66949", "generator id": "1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66949", "date": "2024-09", "mw": 40}, "first_month": "2023-10", "changes": [], "current": {"year": "2024", "month": "9", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Sagebrush Solar 2 ESS 40", "plant state": "CA", "plant id": "66949", "generator id": "1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66949", "date": "2024-09", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Sagebrush Solar 2 ESS 40", "name_short": "Sagebrush Solar 2 ESS 40", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "41.24258519146767", "long": "-121.13500953314751", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.24258519146767+-121.13500953314751", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dover Energy Storage", "city": "", "id": "1311", "external_id": "67120", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1311", "external_id": "67120", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dover Energy Storage", "external_id": "67120", "state": "florida", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Tampa Electric Co", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS1": {"first": {"year": "2024", "month": "9", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Dover Energy Storage", "plant state": "FL", "plant id": "67120", "generator id": "BESS1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67120", "date": "2024-09", "mw": 15}, "first_month": "2024-02", "changes": [{"month": "2024-06", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "9", "entity id": "18454", "entity name": "Tampa Electric Co", "plant producer type": "Electric Utility", "plant name": "Dover Energy Storage", "plant state": "FL", "plant id": "67120", "generator id": "BESS1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67120", "date": "2024-09", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Dover Energy Storage", "name_short": "Dover", "owner": "Tampa Electric Co", "state": "florida", "country": "usa", "lat": "30.119005286236252", "long": "-82.18746637368439", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.119005286236252+-82.18746637368439", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pome BESS", "city": "", "id": "1336", "external_id": "67299", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "IOWN Renewable", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1336", "external_id": "67299", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pome BESS", "external_id": "67299", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "IOWN Renewable", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"10101": {"first": {"year": "2024", "month": "11", "entity id": "66165", "entity name": "IOWN Renewable", "plant producer type": "IPP", "plant name": "Pome BESS", "plant state": "CA", "plant id": "67299", "generator id": "10101", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67299", "date": "2024-11", "mw": 100}, "first_month": "2024-04", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-11", "to": "2024-09", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "66165", "entity name": "IOWN Renewable", "plant producer type": "IPP", "plant name": "Pome BESS", "plant state": "CA", "plant id": "67299", "generator id": "10101", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67299", "date": "2024-09", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Pome BESS", "name_short": "Pome", "owner": "IOWN Renewable", "state": "california", "country": "usa", "lat": "40.94007414887133", "long": "-121.24071773708002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94007414887133+-121.24071773708002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES ES Alamitos 2 LLC", "city": "", "id": "1337", "external_id": "67579", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "164", "power_mw": "82", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1337", "external_id": "67579", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES ES Alamitos 2 LLC", "external_id": "67579", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 164, "power_mw": 82, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ALMT2": {"first": {"year": "2024", "month": "9", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "AES ES Alamitos 2 LLC", "plant state": "CA", "plant id": "67579", "generator id": "ALMT2", "net summer capacity (mw)": "82", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67579", "date": "2024-09", "mw": 82}, "first_month": "2024-06", "changes": [], "current": {"year": "2024", "month": "9", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "AES ES Alamitos 2 LLC", "plant state": "CA", "plant id": "67579", "generator id": "ALMT2", "net summer capacity (mw)": "82", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67579", "date": "2024-09", "mw": 82}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 82, "mwh_is_estimate": true, "mwh": 164, "mwh_estimate": 164, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "AES ES Alamitos 2 LLC", "name_short": "AES ES Alamitos 2", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "40.94954736320376", "long": "-121.17426295600941", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94954736320376+-121.17426295600941", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Quartzite", "city": "", "id": "696", "external_id": "59871", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Desert Quartzite LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "696", "external_id": "59871", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Desert Quartzite", "external_id": "59871", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Desert Quartzite LLC", "status": "construction", "date_first_heard": "2022-05", "start_construction": "2023-04", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2023", "month": "8", "entity id": "59656", "entity name": "Desert Quartzite LLC", "plant producer type": "IPP", "plant name": "Desert Quartzite", "plant state": "CA", "plant id": "59871", "generator id": "GEN02", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "59871", "date": "2023-08", "mw": 150}, "first_month": "2022-05", "changes": [{"month": "2023-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-08", "to": "2024-08", "extra": "delayed by 12 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "59656", "entity name": "Desert Quartzite LLC", "plant producer type": "IPP", "plant name": "Desert Quartzite", "plant state": "CA", "plant id": "59871", "generator id": "GEN02", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "59871", "date": "2024-08", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": "2023-04"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "2023-04", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Desert Quartzite", "name_short": "Desert Quartzite", "owner": "Desert Quartzite LLC", "state": "california", "country": "usa", "lat": "40.82594736691591", "long": "-121.20363569775502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.82594736691591+-121.20363569775502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX10 Hummingbird Storage", "city": "", "id": "718", "external_id": "65693", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "718", "external_id": "65693", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX10 Hummingbird Storage", "external_id": "65693", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Key Capture Energy", "status": "construction", "date_first_heard": "2022-07", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX10": {"first": {"year": "2023", "month": "8", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX10 Hummingbird Storage", "plant state": "TX", "plant id": "65693", "generator id": "TX10", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65693", "date": "2023-08", "mw": 100}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-08", "to": "2024-01", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2024-04", "to": "2024-07", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-07", "to": "2024-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-07", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-07", "to": "2024-08", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX10 Hummingbird Storage", "plant state": "TX", "plant id": "65693", "generator id": "TX10", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "65693", "date": "2024-08", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "TX10 Hummingbird Storage", "name_short": "TX10 Hummingbird", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.33884809055068", "long": "-95.11487066910252", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.33884809055068+-95.11487066910252", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "TX15 Limousin Oak Storage", "city": "", "id": "719", "external_id": "65698", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "719", "external_id": "65698", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "TX15 Limousin Oak Storage", "external_id": "65698", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Key Capture Energy", "status": "construction", "date_first_heard": "2022-07", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TX15": {"first": {"year": "2023", "month": "10", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX15 Limousin Oak Storage", "plant state": "TX", "plant id": "65698", "generator id": "TX15", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65698", "date": "2023-10", "mw": 100}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "date", "from": "2023-10", "to": "2024-01", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-06", "to": "2024-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "8", "entity id": "63289", "entity name": "Key Capture Energy", "plant producer type": "IPP", "plant name": "TX15 Limousin Oak Storage", "plant state": "TX", "plant id": "65698", "generator id": "TX15", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "65698", "date": "2024-08", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "TX15 Limousin Oak Storage", "name_short": "TX15 Limousin Oak", "owner": "Key Capture Energy", "state": "texas", "country": "usa", "lat": "33.386688295226264", "long": "-95.06610767944765", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.386688295226264+-95.06610767944765", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Beaumont BESS", "city": "", "id": "955", "external_id": "66461", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "955", "external_id": "66461", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Beaumont BESS", "external_id": "66461", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Terra-Gen Operating Co-BESS 2", "status": "construction", "date_first_heard": "2023-04", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN1": {"first": {"year": "2024", "month": "3", "entity id": "64287", "entity name": "Terra-Gen Operating Co-BESS", "plant producer type": "IPP", "plant name": "Beaumont BESS", "plant state": "CA", "plant id": "66461", "generator id": "GEN1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66461", "date": "2024-03", "mw": 100}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "entity id", "from": "64287", "to": "65552", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Terra-Gen Operating Co-BESS", "to": "Terra-Gen Operating Co-BESS 2", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2024-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-06", "to": "2024-08", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "65552", "entity name": "Terra-Gen Operating Co-BESS 2", "plant producer type": "IPP", "plant name": "Beaumont BESS", "plant state": "CA", "plant id": "66461", "generator id": "GEN1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66461", "date": "2024-08", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-04", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Beaumont BESS", "name_short": "Beaumont", "owner": "Terra-Gen Operating Co-BESS 2", "state": "california", "country": "usa", "lat": "40.912677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.912677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hemmingway BESS", "city": "", "id": "968", "external_id": "66325", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "968", "external_id": "66325", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hemmingway BESS", "external_id": "66325", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 232, "power_mw": 116, "owner": "Idaho Power Co", "status": "construction", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Hemmingway BESS", "plant state": "ID", "plant id": "66325", "generator id": "1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66325", "date": "2023-06", "mw": 80}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-08", "to": "2023-07", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Hemmingway BESS", "plant state": "ID", "plant id": "66325", "generator id": "1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66325", "date": "2024-06", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}, "HGWP2": {"first": {"year": "2024", "month": "7", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Hemmingway BESS", "plant state": "ID", "plant id": "66325", "generator id": "HGWP2", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66325", "date": "2024-07", "mw": 36}, "first_month": "2024-02", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-07", "to": "2024-08", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Hemmingway BESS", "plant state": "ID", "plant id": "66325", "generator id": "HGWP2", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66325", "date": "2024-08", "mw": 36}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 116, "mwh_is_estimate": true, "mwh": 232, "mwh_estimate": 232, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Hemmingway BESS", "name_short": "Hemmingway", "owner": "Idaho Power Co", "state": "idaho", "country": "usa", "lat": "44.43731843467857", "long": "-112.913255030335", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.43731843467857+-112.913255030335", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grizzly Ridge Solar", "city": "", "id": "1004", "external_id": "66410", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Grizzly Ridge Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1004", "external_id": "66410", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Grizzly Ridge Solar", "external_id": "66410", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Grizzly Ridge Solar LLC", "status": "planning", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"596": {"first": {"year": "2023", "month": "4", "entity id": "65451", "entity name": "Grizzly Ridge Solar LLC", "plant producer type": "Commercial", "plant name": "Grizzly Ridge Solar", "plant state": "TX", "plant id": "66410", "generator id": "596", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66410", "date": "2023-04", "mw": 10}, "first_month": "2023-04", "changes": [{"month": "2023-06", "li": [{"name": "date", "from": "2023-04", "to": "2024-02", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-04", "to": "2024-08", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "65451", "entity name": "Grizzly Ridge Solar LLC", "plant producer type": "Commercial", "plant name": "Grizzly Ridge Solar", "plant state": "TX", "plant id": "66410", "generator id": "596", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66410", "date": "2024-08", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Grizzly Ridge Solar", "name_short": "Grizzly Ridge Solar", "owner": "Grizzly Ridge Solar LLC", "state": "texas", "country": "usa", "lat": "33.537746973433975", "long": "-95.24624450449501", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.537746973433975+-95.24624450449501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McFarland B Solar and Storage", "city": "", "id": "1008", "external_id": "66637", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1008", "external_id": "66637", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McFarland B Solar and Storage", "external_id": "66637", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2023-06", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland B Solar and Storage", "plant state": "AZ", "plant id": "66637", "generator id": "BESS", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66637", "date": "2023-12", "mw": 150}, "first_month": "2023-06", "changes": [{"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2024-05", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-05", "to": "2024-07", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-07", "to": "2024-08", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "McFarland B Solar and Storage", "plant state": "AZ", "plant id": "66637", "generator id": "BESS", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66637", "date": "2024-08", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "McFarland B Solar and Storage", "name_short": "McFarland B Solar", "owner": "AES Clean Energy", "state": "arizona", "country": "usa", "lat": "36.58187920440347", "long": "-110.02764099100999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.58187920440347+-110.02764099100999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Estonian Solar Project, LLC", "city": "", "id": "1058", "external_id": "66872", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Enel Green Power Estonian Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1058", "external_id": "66872", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Estonian Solar Project, LLC", "external_id": "66872", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Enel Green Power Estonian Solar Project, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "4", "entity id": "65799", "entity name": "Enel Green Power Estonian Solar Project, LLC", "plant producer type": "IPP", "plant name": "Estonian Solar Project, LLC", "plant state": "TX", "plant id": "66872", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66872", "date": "2024-04", "mw": 100}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2024-04", "to": "2024-10", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-10", "to": "2024-03", "extra": "accelerated by 7 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-08", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "8", "entity id": "65799", "entity name": "Enel Green Power Estonian Solar Project, LLC", "plant producer type": "IPP", "plant name": "Estonian Solar Project, LLC", "plant state": "TX", "plant id": "66872", "generator id": "BESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66872", "date": "2024-08", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": "2024-02"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "2024-02", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Estonian Solar Project, LLC", "name_short": "Estonian Solar Project", "owner": "Enel Green Power Estonian Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.291825270367276", "long": "-95.05014930955251", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.291825270367276+-95.05014930955251", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Archie Horne", "city": "", "id": "1184", "external_id": "67040", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1184", "external_id": "67040", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Archie Horne", "external_id": "67040", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "North Carolina El Member Corp", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT1": {"first": {"year": "2024", "month": "8", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "Archie Horne", "plant state": "NC", "plant id": "67040", "generator id": "BAT1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67040", "date": "2024-08", "mw": 10}, "first_month": "2023-12", "changes": [], "current": {"year": "2024", "month": "8", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "Archie Horne", "plant state": "NC", "plant id": "67040", "generator id": "BAT1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67040", "date": "2024-08", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "month_disappeared": "", "go_live": "0 ~ 2024-08", "go_live_year_int": 2024, "name": "Archie Horne", "name_short": "Archie Horne", "owner": "North Carolina El Member Corp", "state": "north carolina", "country": "usa", "lat": "36.5619040160412", "long": "-76.800194785395", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.5619040160412+-76.800194785395", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cathode (Hinson) BESS", "city": "", "id": "681", "external_id": "65457", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "681", "external_id": "65457", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cathode (Hinson) BESS", "external_id": "65457", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Southern California Edison Co", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2022-08", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"CATH1": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Cathode (Hinson) BESS", "plant state": "CA", "plant id": "65457", "generator id": "CATH1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65457", "date": "2022-08", "mw": 100}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-04", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-07", "to": "2023-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Cathode (Hinson) BESS", "plant state": "CA", "plant id": "65457", "generator id": "CATH1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65457", "date": "2024-07", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-08"}, "month_disappeared": ""}, "CATH2": {"first": {"year": "2022", "month": "8", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Cathode (Hinson) BESS", "plant state": "CA", "plant id": "65457", "generator id": "CATH2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65457", "date": "2022-08", "mw": 100}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2022-10", "to": "2022-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2022-11", "to": "2023-04", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-07", "to": "2023-09", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "17609", "entity name": "Southern California Edison Co", "plant producer type": "Electric Utility", "plant name": "Cathode (Hinson) BESS", "plant state": "CA", "plant id": "65457", "generator id": "CATH2", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65457", "date": "2024-07", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2022-08"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2022-08", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Cathode (Hinson) BESS", "name_short": "Cathode (Hinson)", "owner": "Southern California Edison Co", "state": "california", "country": "usa", "lat": "41.17891809297625", "long": "-121.12695671403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17891809297625+-121.12695671403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tumbleweed Energy Storage", "city": "", "id": "1017", "external_id": "66666", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Tumbleweed Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1017", "external_id": "66666", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Tumbleweed Energy Storage", "external_id": "66666", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "Tumbleweed Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"TWES1": {"first": {"year": "2024", "month": "6", "entity id": "65685", "entity name": "Tumbleweed Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Tumbleweed Energy Storage", "plant state": "CA", "plant id": "66666", "generator id": "TWES1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66666", "date": "2024-06", "mw": 50}, "first_month": "2023-07", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-06", "to": "2024-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-07", "to": "2024-06", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "65685", "entity name": "Tumbleweed Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Tumbleweed Energy Storage", "plant state": "CA", "plant id": "66666", "generator id": "TWES1", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66666", "date": "2024-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-11"}, "month_disappeared": ""}, "TWES2": {"first": {"year": "2024", "month": "7", "entity id": "65685", "entity name": "Tumbleweed Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Tumbleweed Energy Storage", "plant state": "CA", "plant id": "66666", "generator id": "TWES2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66666", "date": "2024-07", "mw": 75}, "first_month": "2023-07", "changes": [{"month": "2023-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "7", "entity id": "65685", "entity name": "Tumbleweed Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Tumbleweed Energy Storage", "plant state": "CA", "plant id": "66666", "generator id": "TWES2", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66666", "date": "2024-07", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-11"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2023-11", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Tumbleweed Energy Storage", "name_short": "Tumbleweed", "owner": "Tumbleweed Energy Storage, LLC", "state": "california", "country": "usa", "lat": "40.98190804297876", "long": "-121.19777436610111", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.98190804297876+-121.19777436610111", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bottleneck Energy Storage", "city": "", "id": "1037", "external_id": "66757", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "VESI 12 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1037", "external_id": "66757", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bottleneck Energy Storage", "external_id": "66757", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "VESI 12 LLC", "status": "construction", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BN1": {"first": {"year": "2024", "month": "4", "entity id": "65754", "entity name": "VESI 12 LLC", "plant producer type": "IPP", "plant name": "Bottleneck Energy Storage", "plant state": "CA", "plant id": "66757", "generator id": "BN1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66757", "date": "2024-04", "mw": 80}, "first_month": "2023-08", "changes": [{"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-04", "to": "2024-07", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "65754", "entity name": "VESI 12 LLC", "plant producer type": "IPP", "plant name": "Bottleneck Energy Storage", "plant state": "CA", "plant id": "66757", "generator id": "BN1", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66757", "date": "2024-07", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Bottleneck Energy Storage", "name_short": "Bottleneck", "owner": "VESI 12 LLC", "state": "california", "country": "usa", "lat": "40.94954736320376", "long": "-121.17426295600941", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94954736320376+-121.17426295600941", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Myrtle Storage", "city": "", "id": "1055", "external_id": "66913", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Myrtle Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1055", "external_id": "66913", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Myrtle Storage", "external_id": "66913", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Myrtle Storage, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"MYRST": {"first": {"year": "2023", "month": "12", "entity id": "65830", "entity name": "Myrtle Storage, LLC", "plant producer type": "IPP", "plant name": "Myrtle Storage", "plant state": "TX", "plant id": "66913", "generator id": "MYRST", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66913", "date": "2023-12", "mw": 150}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-07", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "65830", "entity name": "Myrtle Storage, LLC", "plant producer type": "IPP", "plant name": "Myrtle Storage", "plant state": "TX", "plant id": "66913", "generator id": "MYRST", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66913", "date": "2024-07", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Myrtle Storage", "name_short": "Myrtle", "owner": "Myrtle Storage, LLC", "state": "texas", "country": "usa", "lat": "33.244054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.244054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Danish Fields Storage", "city": "", "id": "1056", "external_id": "66916", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Danish Fields Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1056", "external_id": "66916", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Danish Fields Storage", "external_id": "66916", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Danish Fields Storage, LLC", "status": "construction", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DANST": {"first": {"year": "2024", "month": "2", "entity id": "65833", "entity name": "Danish Fields Storage, LLC", "plant producer type": "IPP", "plant name": "Danish Fields Storage", "plant state": "TX", "plant id": "66916", "generator id": "DANST", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66916", "date": "2024-02", "mw": 150}, "first_month": "2023-09", "changes": [{"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-07", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "65833", "entity name": "Danish Fields Storage, LLC", "plant producer type": "IPP", "plant name": "Danish Fields Storage", "plant state": "TX", "plant id": "66916", "generator id": "DANST", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66916", "date": "2024-07", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Danish Fields Storage", "name_short": "Danish Fields", "owner": "Danish Fields Storage, LLC", "state": "texas", "country": "usa", "lat": "33.23340888821952", "long": "-95.20174605730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.23340888821952+-95.20174605730502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Longbow BESS, LLC", "city": "", "id": "1188", "external_id": "67083", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "348", "power_mw": "174", "customer": "", "owner": "Longbow BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1188", "external_id": "67083", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Longbow BESS, LLC", "external_id": "67083", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 348, "power_mw": 174, "owner": "Longbow BESS, LLC", "status": "construction", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LBBES": {"first": {"year": "2024", "month": "7", "entity id": "65984", "entity name": "Longbow BESS, LLC", "plant producer type": "IPP", "plant name": "Longbow BESS, LLC", "plant state": "TX", "plant id": "67083", "generator id": "LBBES", "net summer capacity (mw)": "174", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67083", "date": "2024-07", "mw": 174}, "first_month": "2024-01", "changes": [], "current": {"year": "2024", "month": "7", "entity id": "65984", "entity name": "Longbow BESS, LLC", "plant producer type": "IPP", "plant name": "Longbow BESS, LLC", "plant state": "TX", "plant id": "67083", "generator id": "LBBES", "net summer capacity (mw)": "174", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67083", "date": "2024-07", "mw": 174}, "current_month": "2024-06", "dates": {"first_heard": "2024-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 174, "mwh_is_estimate": true, "mwh": 348, "mwh_estimate": 348, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Longbow BESS, LLC", "name_short": "Longbow BESS", "owner": "Longbow BESS, LLC", "state": "texas", "country": "usa", "lat": "33.65154984477027", "long": "-95.54526771010998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65154984477027+-95.54526771010998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Santee BESS", "city": "", "id": "1310", "external_id": "67118", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1310", "external_id": "67118", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Santee BESS", "external_id": "67118", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "San Diego Gas & Electric Co", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Santee BESS", "plant state": "CA", "plant id": "67118", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67118", "date": "2024-07", "mw": 10}, "first_month": "2024-02", "changes": [], "current": {"year": "2024", "month": "7", "entity id": "16609", "entity name": "San Diego Gas & Electric Co", "plant producer type": "Electric Utility", "plant name": "Santee BESS", "plant state": "CA", "plant id": "67118", "generator id": "1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67118", "date": "2024-07", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Santee BESS", "name_short": "Santee", "owner": "San Diego Gas & Electric Co", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.320049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.320049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Franklin Battery Storage", "city": "", "id": "1315", "external_id": "67183", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1315", "external_id": "67183", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Franklin Battery Storage", "external_id": "67183", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Idaho Power Co", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FRBS": {"first": {"year": "2024", "month": "7", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Franklin Battery Storage", "plant state": "ID", "plant id": "67183", "generator id": "FRBS", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67183", "date": "2024-07", "mw": 60}, "first_month": "2024-02", "changes": [], "current": {"year": "2024", "month": "7", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Franklin Battery Storage", "plant state": "ID", "plant id": "67183", "generator id": "FRBS", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67183", "date": "2024-07", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Franklin Battery Storage", "name_short": "Franklin", "owner": "Idaho Power Co", "state": "idaho", "country": "usa", "lat": "44.133334", "long": "-112.673786", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.133334+-112.673786", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Davis Battery Storage", "city": "", "id": "1340", "external_id": "67304", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1340", "external_id": "67304", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Davis Battery Storage", "external_id": "67304", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "United Power, Inc", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DAVBA": {"first": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Davis Battery Storage", "plant state": "CO", "plant id": "67304", "generator id": "DAVBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67304", "date": "2024-05", "mw": 11}, "first_month": "2024-04", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-07", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Davis Battery Storage", "plant state": "CO", "plant id": "67304", "generator id": "DAVBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67304", "date": "2024-07", "mw": 11}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "Davis Battery Storage", "name_short": "Davis", "owner": "United Power, Inc", "state": "colorado", "country": "usa", "lat": "40.632576", "long": "-102.636675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.632576+-102.636675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "High Mesa CO", "city": "", "id": "1343", "external_id": "67323", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1343", "external_id": "67323", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "High Mesa CO", "external_id": "67323", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HMESS": {"first": {"year": "2024", "month": "4", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "High Mesa CO", "plant state": "CO", "plant id": "67323", "generator id": "HMESS", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67323", "date": "2024-04", "mw": 10}, "first_month": "2024-04", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-07", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "7", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "High Mesa CO", "plant state": "CO", "plant id": "67323", "generator id": "HMESS", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67323", "date": "2024-07", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "month_disappeared": "", "go_live": "0 ~ 2024-07", "go_live_year_int": 2024, "name": "High Mesa CO", "name_short": "High Mesa CO", "owner": "AES Clean Energy", "state": "colorado", "country": "usa", "lat": "40.750692481178746", "long": "-102.6308583531653", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.750692481178746+-102.6308583531653", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "San Juan 1", "city": "", "id": "103", "external_id": "66574", "state": "new mexico", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "430", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.804042", "long": "-108.445356", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, "internal_id": "103", "external_id": "66574", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "San Juan Solar I", "external_id": "66574", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "San Juan Solar I, LLC", "status": "construction", "date_first_heard": "2023-05", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SJSS": {"first": {"year": "2024", "month": "8", "entity id": "65626", "entity name": "San Juan Solar I, LLC", "plant producer type": "IPP", "plant name": "San Juan Solar I", "plant state": "NM", "plant id": "66574", "generator id": "SJSS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66574", "date": "2024-08", "mw": 100}, "first_month": "2023-05", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2024-08", "to": "2024-07", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-07", "to": "2024-05", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "65626", "entity name": "San Juan Solar I, LLC", "plant producer type": "IPP", "plant name": "San Juan Solar I", "plant state": "NM", "plant id": "66574", "generator id": "SJSS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66574", "date": "2024-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-05", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "San Juan Solar I", "name_short": "San Juan Solar I", "owner": "San Juan Solar I, LLC", "state": "new mexico", "country": "usa", "lat": "36.804042", "long": "-108.445356", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.804042+-108.445356", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cascade", "city": "Stockton", "id": "112", "external_id": "61801", "state": "california", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "PG&E", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "SYL Battery (Risen Energy)", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-24", "start_construction": "", "start_operation": "", "start_estimated": "2022Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.921103", "long": "-121.24114", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://ceqanet.opr.ca.gov/2020090414/2", "link2": "https://www.energy-storage.news/broad-reach-power-orders-118mwh-ess-equipment-for-california-project-from-syl-battery/", "link3": "", "link4": ""}, "internal_id": "112", "external_id": "61801", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cascade Energy Storage, LLC", "external_id": "61801", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Engie North America", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-05", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"10002": {"first": {"year": "2022", "month": "12", "entity id": "59380", "entity name": "Enel Green Power NA, Inc.", "plant producer type": "IPP", "plant name": "Cascade Energy Storage, LLC", "plant state": "CA", "plant id": "61801", "generator id": "10002", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "61801", "date": "2022-12", "mw": 25}, "first_month": "2020-09", "changes": [{"month": "2021-04", "li": [{"name": "entity id", "from": "59380", "to": "63883", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Enel Green Power NA, Inc.", "to": "Broad Reach Power", "extra": "", "change_type": "misc"}]}, {"month": "2022-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-12", "to": "2023-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-04", "to": "2023-07", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Cascade Energy Storage, LLC", "plant state": "CA", "plant id": "61801", "generator id": "10002", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "61801", "date": "2024-06", "mw": 25}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-05"}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-05", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Cascade Energy Storage, LLC", "name_short": "Cascade Energy Storage", "owner": "Engie North America", "state": "california", "country": "usa", "lat": "37.921103", "long": "-121.24114", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:37.921103+-121.24114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://ceqanet.opr.ca.gov/2020090414/2", "https://www.energy-storage.news/broad-reach-power-orders-118mwh-ess-equipment-for-california-project-from-syl-battery/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sierra Energy Storage, LLC", "city": "", "id": "200", "external_id": "61803", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Enel Green Power NA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "200", "external_id": "61803", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sierra Energy Storage, LLC", "external_id": "61803", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Engie North America", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"10003": {"first": {"year": "2022", "month": "12", "entity id": "59380", "entity name": "Enel Green Power NA, Inc.", "plant producer type": "IPP", "plant name": "Sierra Energy Storage, LLC", "plant state": "CA", "plant id": "61803", "generator id": "10003", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "61803", "date": "2022-12", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2022-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "entity id", "from": "59380", "to": "63883", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Enel Green Power NA, Inc.", "to": "Broad Reach Power", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-02", "to": "2023-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-03", "to": "2023-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Sierra Energy Storage, LLC", "plant state": "CA", "plant id": "61803", "generator id": "10003", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "61803", "date": "2024-06", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-09"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Sierra Energy Storage, LLC", "name_short": "Sierra Energy Storage", "owner": "Engie North America", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.300049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.300049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chaparral Springs", "city": "", "id": "549", "external_id": "64864", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "549", "external_id": "64864", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Chaparral Springs", "external_id": "64864", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 176, "power_mw": 88, "owner": "Leeward Asset Management, LLC", "status": "construction", "date_first_heard": "2021-11", "start_construction": "2022-02", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"CHAPB": {"first": {"year": "2022", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Chaparral Springs", "plant state": "CA", "plant id": "64864", "generator id": "CHAPB", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64864", "date": "2022-12", "mw": 50}, "first_month": "2021-11", "changes": [{"month": "2022-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-12", "li": [{"name": "date", "from": "2022-12", "to": "2023-09", "extra": "delayed by 9 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "mw", "from": 50, "to": 52, "extra": "", "change_type": "misc"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Chaparral Springs", "plant state": "CA", "plant id": "64864", "generator id": "CHAPB", "net summer capacity (mw)": "52", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64864", "date": "2024-06", "mw": 52}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": "2022-02"}, "month_disappeared": ""}, "WS3BA": {"first": {"year": "2023", "month": "12", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Chaparral Springs", "plant state": "CA", "plant id": "64864", "generator id": "WS3BA", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64864", "date": "2023-12", "mw": 36}, "first_month": "2023-06", "changes": [{"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "50123", "entity name": "Leeward Asset Management, LLC", "plant producer type": "IPP", "plant name": "Chaparral Springs", "plant state": "CA", "plant id": "64864", "generator id": "WS3BA", "net summer capacity (mw)": "36", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64864", "date": "2024-06", "mw": 36}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 88, "mwh_is_estimate": true, "mwh": 176, "mwh_estimate": 176, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "2022-02", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Chaparral Springs", "name_short": "Chaparral Springs", "owner": "Leeward Asset Management, LLC", "state": "california", "country": "usa", "lat": "41.20858372443624", "long": "-121.56444271153005", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.20858372443624+-121.56444271153005", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hummingbird Energy Storage LLC", "city": "", "id": "620", "external_id": "65395", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Hummingbird Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "620", "external_id": "65395", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hummingbird Energy Storage LLC", "external_id": "65395", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 150, "power_mw": 75, "owner": "Hummingbird Energy Storage, LLC", "status": "construction", "date_first_heard": "2022-03", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HUMB1": {"first": {"year": "2023", "month": "6", "entity id": "64738", "entity name": "Hummingbird Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Hummingbird Energy Storage LLC", "plant state": "CA", "plant id": "65395", "generator id": "HUMB1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65395", "date": "2023-06", "mw": 75}, "first_month": "2022-03", "changes": [{"month": "2022-10", "li": [{"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-12", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-12", "to": "2024-06", "extra": "accelerated by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "64738", "entity name": "Hummingbird Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Hummingbird Energy Storage LLC", "plant state": "CA", "plant id": "65395", "generator id": "HUMB1", "net summer capacity (mw)": "75", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65395", "date": "2024-06", "mw": 75}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 75, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-03", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Hummingbird Energy Storage LLC", "name_short": "Hummingbird Energy Storage", "owner": "Hummingbird Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.260049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.260049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dickens", "city": "", "id": "685", "external_id": "65489", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "685", "external_id": "65489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dickens", "external_id": "65489", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DIKNS": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Dickens", "plant state": "TX", "plant id": "65489", "generator id": "DIKNS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65489", "date": "2023-06", "mw": 200}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Dickens", "plant state": "TX", "plant id": "65489", "generator id": "DIKNS", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65489", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Dickens", "name_short": "Dickens", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.724054", "long": "-95.273438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.724054+-95.273438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hydra", "city": "", "id": "686", "external_id": "65490", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "686", "external_id": "65490", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hydra", "external_id": "65490", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HYDRA": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Hydra", "plant state": "TX", "plant id": "65490", "generator id": "HYDRA", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65490", "date": "2023-06", "mw": 200}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-11", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Hydra", "plant state": "TX", "plant id": "65490", "generator id": "HYDRA", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65490", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Hydra", "name_short": "Hydra", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.73176250275819", "long": "-95.36367096235749", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.73176250275819+-95.36367096235749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Paleo", "city": "", "id": "687", "external_id": "65491", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "687", "external_id": "65491", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Paleo", "external_id": "65491", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PALEO": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Paleo", "plant state": "TX", "plant id": "65491", "generator id": "PALEO", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65491", "date": "2023-06", "mw": 200}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-12", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Paleo", "plant state": "TX", "plant id": "65491", "generator id": "PALEO", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65491", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Paleo", "name_short": "Paleo", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.70808533623373", "long": "-95.45800256921983", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.70808533623373+-95.45800256921983", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pavo", "city": "", "id": "688", "external_id": "65492", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "175", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "688", "external_id": "65492", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Pavo", "external_id": "65492", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 350, "power_mw": 175, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PAVO": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Pavo", "plant state": "TX", "plant id": "65492", "generator id": "PAVO", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65492", "date": "2023-06", "mw": 175}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-11", "extra": "delayed by 5 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Pavo", "plant state": "TX", "plant id": "65492", "generator id": "PAVO", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65492", "date": "2024-06", "mw": 175}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 175, "mwh_is_estimate": true, "mwh": 350, "mwh_estimate": 350, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Pavo", "name_short": "Pavo", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.65154984477027", "long": "-95.54526771010998", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.65154984477027+-95.54526771010998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tortolas", "city": "", "id": "689", "external_id": "65493", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "689", "external_id": "65493", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Tortolas", "external_id": "65493", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 100, "power_mw": 50, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"TORTO": {"first": {"year": "2023", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Tortolas", "plant state": "TX", "plant id": "65493", "generator id": "TORTO", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65493", "date": "2023-06", "mw": 50}, "first_month": "2022-04", "changes": [{"month": "2023-03", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-09", "to": "2023-12", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Tortolas", "plant state": "TX", "plant id": "65493", "generator id": "TORTO", "net summer capacity (mw)": "50", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65493", "date": "2024-06", "mw": 50}, "current_month": "2024-06", "dates": {"first_heard": "2022-04", "start_construction": "2023-03"}, "month_disappeared": ""}}, "mw": 50, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-04", "start_construction": "2023-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Tortolas", "name_short": "Tortolas", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.56468208398623", "long": "-95.61391623283366", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.56468208398623+-95.61391623283366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "San Jacinto Grid, LLC", "city": "", "id": "707", "external_id": "65657", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "65", "customer": "", "owner": "San Jacinto Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "707", "external_id": "65657", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "San Jacinto Grid, LLC", "external_id": "65657", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 130, "power_mw": 65, "owner": "San Jacinto Grid, LLC", "status": "construction", "date_first_heard": "2022-06", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HESJG": {"first": {"year": "2023", "month": "3", "entity id": "64936", "entity name": "San Jacinto Grid, LLC", "plant producer type": "IPP", "plant name": "San Jacinto Grid, LLC", "plant state": "CA", "plant id": "65657", "generator id": "HESJG", "net summer capacity (mw)": "65", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65657", "date": "2023-03", "mw": 65}, "first_month": "2022-06", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2023-03", "to": "2023-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-01", "to": "2024-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-03", "to": "2024-06", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "64936", "entity name": "San Jacinto Grid, LLC", "plant producer type": "IPP", "plant name": "San Jacinto Grid, LLC", "plant state": "CA", "plant id": "65657", "generator id": "HESJG", "net summer capacity (mw)": "65", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65657", "date": "2024-06", "mw": 65}, "current_month": "2024-06", "dates": {"first_heard": "2022-06", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 65, "mwh_is_estimate": true, "mwh": 130, "mwh_estimate": 130, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-06", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "San Jacinto Grid, LLC", "name_short": "San Jacinto Grid", "owner": "San Jacinto Grid, LLC", "state": "california", "country": "usa", "lat": "41.24726561713374", "long": "-121.39056792885305", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.24726561713374+-121.39056792885305", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Octans", "city": "", "id": "716", "external_id": "65590", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "716", "external_id": "65590", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Octans", "external_id": "65590", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 250, "power_mw": 125, "owner": "Engie North America", "status": "construction", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"OCTNS": {"first": {"year": "2024", "month": "6", "entity id": "63883", "entity name": "Broad Reach Power", "plant producer type": "IPP", "plant name": "Octans", "plant state": "TX", "plant id": "65590", "generator id": "OCTNS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65590", "date": "2024-06", "mw": 125}, "first_month": "2022-05", "changes": [{"month": "2024-03", "li": [{"name": "entity id", "from": "63883", "to": "56201", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Broad Reach Power", "to": "Engie North America", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "56201", "entity name": "Engie North America", "plant producer type": "IPP", "plant name": "Octans", "plant state": "TX", "plant id": "65590", "generator id": "OCTNS", "net summer capacity (mw)": "125", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65590", "date": "2024-06", "mw": 125}, "current_month": "2024-06", "dates": {"first_heard": "2022-05", "start_construction": "2024-03"}, "month_disappeared": ""}}, "mw": 125, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-05", "start_construction": "2024-03", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Octans", "name_short": "Octans", "owner": "Engie North America", "state": "texas", "country": "usa", "lat": "33.309493409523135", "long": "-95.226467416855", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.309493409523135+-95.226467416855", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sierra Estrella Energy Storage", "city": "", "id": "851", "external_id": "66334", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "276", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.410648", "long": "-112.313765", "coords_hint": "1", "use_case": "", "notes": "got the location from the map on the projects page / nr of megapacks from the pdf", "project_website": "https://www.sierraestrellaenergystorage.com/about", "link1": "https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf", "link2": "", "link3": "", "link4": ""}, "internal_id": "851", "external_id": "66334", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sierra Estrella Energy Storage", "external_id": "66334", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Sierra Estrella Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS3": {"first": {"year": "2024", "month": "6", "entity id": "65418", "entity name": "Sierra Estrella Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Sierra Estrella Energy Storage", "plant state": "AZ", "plant id": "66334", "generator id": "BESS3", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66334", "date": "2024-06", "mw": 250}, "first_month": "2023-03", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65418", "entity name": "Sierra Estrella Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Sierra Estrella Energy Storage", "plant state": "AZ", "plant id": "66334", "generator id": "BESS3", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66334", "date": "2024-06", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 500, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Sierra Estrella Energy Storage", "name_short": "Sierra Estrella", "owner": "Sierra Estrella Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "33.410648", "long": "-112.313765", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.410648+-112.313765", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 276, "notes_split": ["got the location from the map on the projects page / nr of megapacks from the pdf"], "links": ["https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Superstition Energy Storage", "city": "Gilbert", "id": "852", "external_id": "66333", "state": "arizona", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "", "power_mw": "90", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.358927", "long": "-111.831039", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.superstitionenergystorage.com/about", "link1": "https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "852", "external_id": "66333", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Superstition Energy Storage", "external_id": "66333", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 180, "power_mw": 90, "owner": "Superstition Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS4": {"first": {"year": "2024", "month": "6", "entity id": "65419", "entity name": "Superstition Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Superstition Energy Storage", "plant state": "AZ", "plant id": "66333", "generator id": "BESS4", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66333", "date": "2024-06", "mw": 90}, "first_month": "2023-03", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65419", "entity name": "Superstition Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Superstition Energy Storage", "plant state": "AZ", "plant id": "66333", "generator id": "BESS4", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66333", "date": "2024-06", "mw": 90}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 90, "mwh_is_estimate": false, "mwh": 360, "mwh_estimate": 180, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Superstition Energy Storage", "name_short": "Superstition", "owner": "Superstition Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "33.358927", "long": "-111.831039", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.358927+-111.831039", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Black Mesa BESS", "city": "", "id": "969", "external_id": "66326", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "969", "external_id": "66326", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Black Mesa BESS", "external_id": "66326", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 80, "power_mw": 40, "owner": "Idaho Power Co", "status": "construction", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2023", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Black Mesa BESS", "plant state": "ID", "plant id": "66326", "generator id": "1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66326", "date": "2023-06", "mw": 40}, "first_month": "2023-03", "changes": [{"month": "2023-04", "li": [{"name": "date", "from": "2023-06", "to": "2023-09", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "9191", "entity name": "Idaho Power Co", "plant producer type": "Electric Utility", "plant name": "Black Mesa BESS", "plant state": "ID", "plant id": "66326", "generator id": "1", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66326", "date": "2024-06", "mw": 40}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 40, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Black Mesa BESS", "name_short": "Black Mesa", "owner": "Idaho Power Co", "state": "idaho", "country": "usa", "lat": "44.361601404211235", "long": "-112.97622197218186", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.361601404211235+-112.97622197218186", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Callisto I Energy Center", "city": "", "id": "997", "external_id": "66338", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Callisto I Energy Center", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "997", "external_id": "66338", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Callisto I Energy Center", "external_id": "66338", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Callisto I Energy Center", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CALL1": {"first": {"year": "2024", "month": "6", "entity id": "65428", "entity name": "Callisto I Energy Center", "plant producer type": "IPP", "plant name": "Callisto I Energy Center", "plant state": "TX", "plant id": "66338", "generator id": "CALL1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66338", "date": "2024-06", "mw": 100}, "first_month": "2023-03", "changes": [{"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65428", "entity name": "Callisto I Energy Center", "plant producer type": "IPP", "plant name": "Callisto I Energy Center", "plant state": "TX", "plant id": "66338", "generator id": "CALL1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66338", "date": "2024-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Callisto I Energy Center", "name_short": "Callisto I", "owner": "Callisto I Energy Center", "state": "texas", "country": "usa", "lat": "33.183842323878764", "long": "-95.07711772573431", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.183842323878764+-95.07711772573431", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brazos Bend BESS, LLC", "city": "", "id": "1031", "external_id": "66690", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Brazos Bend BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1031", "external_id": "66690", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Brazos Bend BESS, LLC", "external_id": "66690", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Brazos Bend BESS, LLC", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BEND": {"first": {"year": "2024", "month": "6", "entity id": "65696", "entity name": "Brazos Bend BESS, LLC", "plant producer type": "IPP", "plant name": "Brazos Bend BESS, LLC", "plant state": "TX", "plant id": "66690", "generator id": "BEND", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66690", "date": "2024-06", "mw": 100}, "first_month": "2023-07", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65696", "entity name": "Brazos Bend BESS, LLC", "plant producer type": "IPP", "plant name": "Brazos Bend BESS, LLC", "plant state": "TX", "plant id": "66690", "generator id": "BEND", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66690", "date": "2024-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Brazos Bend BESS, LLC", "name_short": "Brazos Bend BESS", "owner": "Brazos Bend BESS, LLC", "state": "texas", "country": "usa", "lat": "33.428714606461256", "long": "-95.3514246343362", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.428714606461256+-95.3514246343362", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Baldy Mesa 2_Silver Peak Hybrid", "city": "", "id": "1040", "external_id": "66885", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1040", "external_id": "66885", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Baldy Mesa 2_Silver Peak Hybrid", "external_id": "66885", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SPKBS": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Baldy Mesa 2_Silver Peak Hybrid", "plant state": "CA", "plant id": "66885", "generator id": "SPKBS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66885", "date": "2023-12", "mw": 25}, "first_month": "2023-09", "changes": [{"month": "2023-11", "li": [{"name": "date", "from": "2023-12", "to": "2024-06", "extra": "delayed by 6 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Baldy Mesa 2_Silver Peak Hybrid", "plant state": "CA", "plant id": "66885", "generator id": "SPKBS", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66885", "date": "2024-06", "mw": 25}, "current_month": "2024-06", "dates": {"first_heard": "2023-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-09", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Baldy Mesa 2_Silver Peak Hybrid", "name_short": "Baldy Mesa 2_Silver Peak", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.220049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.220049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Borden County BESS", "city": "", "id": "1054", "external_id": "66804", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Borden County Battery Energy Storage System LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1054", "external_id": "66804", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Borden County BESS", "external_id": "66804", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Borden County Battery Energy Storage System LLC", "status": "construction", "date_first_heard": "2023-08", "start_construction": "2024-01", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "5", "entity id": "65765", "entity name": "Borden County Battery Energy Storage System LLC", "plant producer type": "IPP", "plant name": "Borden County BESS", "plant state": "TX", "plant id": "66804", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66804", "date": "2024-05", "mw": 150}, "first_month": "2023-08", "changes": [{"month": "2024-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "65765", "entity name": "Borden County Battery Energy Storage System LLC", "plant producer type": "IPP", "plant name": "Borden County BESS", "plant state": "TX", "plant id": "66804", "generator id": "1", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66804", "date": "2024-06", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": "2024-01"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-08", "start_construction": "2024-01", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Borden County BESS", "name_short": "Borden County", "owner": "Borden County Battery Energy Storage System LLC", "state": "texas", "country": "usa", "lat": "33.27525537493651", "long": "-95.3315331949425", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.27525537493651+-95.3315331949425", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fence Post Solar Hybrid Project, LLC", "city": "", "id": "1061", "external_id": "66801", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "144", "power_mw": "72", "customer": "", "owner": "Fence Post Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1061", "external_id": "66801", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Fence Post Solar Hybrid Project, LLC", "external_id": "66801", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 144, "power_mw": 72, "owner": "Fence Post Solar Project, LLC", "status": "construction", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FNCBE": {"first": {"year": "2024", "month": "3", "entity id": "65774", "entity name": "Fence Post Solar Project, LLC", "plant producer type": "IPP", "plant name": "Fence Post Solar Hybrid Project, LLC", "plant state": "TX", "plant id": "66801", "generator id": "FNCBE", "net summer capacity (mw)": "72", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66801", "date": "2024-03", "mw": 72}, "first_month": "2023-08", "changes": [{"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-06", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "65774", "entity name": "Fence Post Solar Project, LLC", "plant producer type": "IPP", "plant name": "Fence Post Solar Hybrid Project, LLC", "plant state": "TX", "plant id": "66801", "generator id": "FNCBE", "net summer capacity (mw)": "72", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66801", "date": "2024-06", "mw": 72}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": null}, "month_disappeared": ""}}, "mw": 72, "mwh_is_estimate": true, "mwh": 144, "mwh_estimate": 144, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-08", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Fence Post Solar Hybrid Project, LLC", "name_short": "Fence Post Solar Hybrid Project", "owner": "Fence Post Solar Project, LLC", "state": "texas", "country": "usa", "lat": "33.49793441320124", "long": "-95.13838797468608", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.49793441320124+-95.13838797468608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Butler", "city": "", "id": "1185", "external_id": "67042", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1185", "external_id": "67042", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Butler", "external_id": "67042", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "North Carolina El Member Corp", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT1": {"first": {"year": "2024", "month": "8", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "Butler", "plant state": "NC", "plant id": "67042", "generator id": "BAT1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67042", "date": "2024-08", "mw": 10}, "first_month": "2023-12", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-08", "to": "2024-06", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "Butler", "plant state": "NC", "plant id": "67042", "generator id": "BAT1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67042", "date": "2024-06", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Butler", "name_short": "Butler", "owner": "North Carolina El Member Corp", "state": "north carolina", "country": "usa", "lat": "36.596042000000004", "long": "-76.876831", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.596042000000004+-76.876831", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Franklin Solar Hybrid", "city": "", "id": "1314", "external_id": "67190", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Franklin Solar Idaho", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1314", "external_id": "67190", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Franklin Solar Hybrid", "external_id": "67190", "state": "idaho", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Franklin Solar Idaho", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FBESS": {"first": {"year": "2024", "month": "6", "entity id": "66071", "entity name": "Franklin Solar Idaho", "plant producer type": "IPP", "plant name": "Franklin Solar Hybrid", "plant state": "ID", "plant id": "67190", "generator id": "FBESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67190", "date": "2024-06", "mw": 100}, "first_month": "2024-02", "changes": [{"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "66071", "entity name": "Franklin Solar Idaho", "plant producer type": "IPP", "plant name": "Franklin Solar Hybrid", "plant state": "ID", "plant id": "67190", "generator id": "FBESS", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67190", "date": "2024-06", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Franklin Solar Hybrid", "name_short": "Franklin Solar", "owner": "Franklin Solar Idaho", "state": "idaho", "country": "usa", "lat": "44.16061989624012", "long": "-112.7071598353925", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.16061989624012+-112.7071598353925", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eleven Mile Solar Center", "city": "", "id": "1323", "external_id": "66263", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Eleven Mile Solar Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1323", "external_id": "66263", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eleven Mile Solar Center", "external_id": "66263", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Eleven Mile Solar Center, LLC", "status": "construction", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"2222": {"first": {"year": "2024", "month": "6", "entity id": "65368", "entity name": "Eleven Mile Solar Center, LLC", "plant producer type": "IPP", "plant name": "Eleven Mile Solar Center", "plant state": "AZ", "plant id": "66263", "generator id": "2222", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66263", "date": "2024-06", "mw": 300}, "first_month": "2024-03", "changes": [{"month": "2024-06", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65368", "entity name": "Eleven Mile Solar Center, LLC", "plant producer type": "IPP", "plant name": "Eleven Mile Solar Center", "plant state": "AZ", "plant id": "66263", "generator id": "2222", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66263", "date": "2024-06", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Eleven Mile Solar Center", "name_short": "Eleven Mile Solar Center", "owner": "Eleven Mile Solar Center, LLC", "state": "arizona", "country": "usa", "lat": "36.56418480140374", "long": "-109.822948763257", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.56418480140374+-109.822948763257", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sun Streams 3", "city": "", "id": "1326", "external_id": "67285", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "430", "power_mw": "215", "customer": "", "owner": "Sun Streams PVS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1326", "external_id": "67285", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sun Streams 3", "external_id": "67285", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 430, "power_mw": 215, "owner": "Sun Streams PVS, LLC", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2024", "month": "6", "entity id": "66151", "entity name": "Sun Streams PVS, LLC", "plant producer type": "IPP", "plant name": "Sun Streams 3", "plant state": "AZ", "plant id": "67285", "generator id": "GEN02", "net summer capacity (mw)": "215", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67285", "date": "2024-06", "mw": 215}, "first_month": "2024-04", "changes": [], "current": {"year": "2024", "month": "6", "entity id": "66151", "entity name": "Sun Streams PVS, LLC", "plant producer type": "IPP", "plant name": "Sun Streams 3", "plant state": "AZ", "plant id": "67285", "generator id": "GEN02", "net summer capacity (mw)": "215", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67285", "date": "2024-06", "mw": 215}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 215, "mwh_is_estimate": true, "mwh": 430, "mwh_estimate": 430, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Sun Streams 3", "name_short": "Sun Streams 3", "owner": "Sun Streams PVS, LLC", "state": "arizona", "country": "usa", "lat": "36.642010720802766", "long": "-109.9384049230325", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.642010720802766+-109.9384049230325", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Apache Solar 1", "city": "", "id": "1334", "external_id": "60964", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Electric Pwr Coop Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1334", "external_id": "60964", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Apache Solar 1", "external_id": "60964", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Arizona Electric Pwr Coop Inc", "status": "construction", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AEPB1": {"first": {"year": "2024", "month": "6", "entity id": "796", "entity name": "Arizona Electric Pwr Coop Inc", "plant producer type": "Electric Utility", "plant name": "Apache Solar 1", "plant state": "AZ", "plant id": "60964", "generator id": "AEPB1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "60964", "date": "2024-06", "mw": 10}, "first_month": "2024-06", "changes": [], "current": {"year": "2024", "month": "6", "entity id": "796", "entity name": "Arizona Electric Pwr Coop Inc", "plant producer type": "Electric Utility", "plant name": "Apache Solar 1", "plant state": "AZ", "plant id": "60964", "generator id": "AEPB1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "60964", "date": "2024-06", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Apache Solar 1", "name_short": "Apache Solar 1", "owner": "Arizona Electric Pwr Coop Inc", "state": "arizona", "country": "usa", "lat": "36.33767263558831", "long": "-109.9309885151675", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.33767263558831+-109.9309885151675", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bromley Battery Storage", "city": "", "id": "1339", "external_id": "67305", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1339", "external_id": "67305", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bromley Battery Storage", "external_id": "67305", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "United Power, Inc", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BROBA": {"first": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Bromley Battery Storage", "plant state": "CO", "plant id": "67305", "generator id": "BROBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67305", "date": "2024-05", "mw": 11}, "first_month": "2024-04", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Bromley Battery Storage", "plant state": "CO", "plant id": "67305", "generator id": "BROBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67305", "date": "2024-06", "mw": 11}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Bromley Battery Storage", "name_short": "Bromley", "owner": "United Power, Inc", "state": "colorado", "country": "usa", "lat": "40.552849615451265", "long": "-102.47130241879584", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.552849615451265+-102.47130241879584", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Anemoi Energy Storage", "city": "", "id": "1356", "external_id": "67236", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Anemoi Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1356", "external_id": "67236", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Anemoi Energy Storage", "external_id": "67236", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Anemoi Energy Storage, LLC", "status": "construction", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ANEM1": {"first": {"year": "2024", "month": "5", "entity id": "66110", "entity name": "Anemoi Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Anemoi Energy Storage", "plant state": "TX", "plant id": "67236", "generator id": "ANEM1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67236", "date": "2024-05", "mw": 200}, "first_month": "2024-03", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2024-05", "to": "2024-06", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "6", "entity id": "66110", "entity name": "Anemoi Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Anemoi Energy Storage", "plant state": "TX", "plant id": "67236", "generator id": "ANEM1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67236", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Anemoi Energy Storage", "name_short": "Anemoi", "owner": "Anemoi Energy Storage, LLC", "state": "texas", "country": "usa", "lat": "33.23340888821952", "long": "-95.20174605730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.23340888821952+-95.20174605730502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ebony Energy Storage", "city": "", "id": "1357", "external_id": "67237", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Ebony Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1357", "external_id": "67237", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ebony Energy Storage", "external_id": "67237", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Ebony Energy Storage, LLC", "status": "construction", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"EBON1": {"first": {"year": "2024", "month": "6", "entity id": "66111", "entity name": "Ebony Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Ebony Energy Storage", "plant state": "TX", "plant id": "67237", "generator id": "EBON1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67237", "date": "2024-06", "mw": 200}, "first_month": "2024-03", "changes": [], "current": {"year": "2024", "month": "6", "entity id": "66111", "entity name": "Ebony Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Ebony Energy Storage", "plant state": "TX", "plant id": "67237", "generator id": "EBON1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67237", "date": "2024-06", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Ebony Energy Storage", "name_short": "Ebony", "owner": "Ebony Energy Storage, LLC", "state": "texas", "country": "usa", "lat": "33.24856368342876", "long": "-95.12414054591771", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.24856368342876+-95.12414054591771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Big Star", "city": "Bastrop County", "id": "42", "external_id": "64202", "state": "texas", "country": "usa", "capacity_mwh": "120", "estimate_mwh": "", "power_mw": "80", "customer": "RWE Renewables", "owner": "", "developer": "", "manufacturer": "LG", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.913908", "long": "-97.289792", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/rwe-signs-up-corporate-offtaker-for-big-star-texas-solar-plus-storage-project/", "link2": "https://www.rwe.com/en/press/rwe-renewables/2021-08-25-rwe-teams-up-with-constellation-to-supply-major-us-commercial-customers-with-solar-energy-from-big-star-facility", "link3": "", "link4": ""}, "internal_id": "42", "external_id": "64202", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Big Star Solar, LLC (Hybrid)", "external_id": "64202", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "RWE Renewables Americas, LLC", "status": "construction", "date_first_heard": "2021-01", "start_construction": "2021-06", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BGSTB": {"first": {"year": "2022", "month": "4", "entity id": "56215", "entity name": "RWE Renewables Americas LLC", "plant producer type": "IPP", "plant name": "Big Star Solar, LLC", "plant state": "TX", "plant id": "64202", "generator id": "BGSTB", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "64202", "date": "2022-04", "mw": 80}, "first_month": "2021-01", "changes": [{"month": "2021-02", "li": [{"name": "plant name", "from": "Big Star Solar, LLC", "to": "Big Star Solar, LLC (Hybrid)", "extra": "", "change_type": "misc"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-04", "to": "2022-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2022-05", "to": "2022-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-04", "to": "2022-11", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-11", "to": "2022-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-08", "li": [{"name": "date", "from": "2022-12", "to": "2023-08", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-08", "to": "2023-09", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-09", "to": "2023-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "entity name", "from": "RWE Renewables Americas LLC", "to": "RWE Renewables Americas, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-12", "to": "2024-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2024-04", "to": "2024-02", "extra": "accelerated by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2024-02", "to": "2024-01", "extra": "accelerated by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-01", "to": "2024-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "56215", "entity name": "RWE Renewables Americas, LLC", "plant producer type": "IPP", "plant name": "Big Star Solar, LLC (Hybrid)", "plant state": "TX", "plant id": "64202", "generator id": "BGSTB", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64202", "date": "2024-05", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": false, "mwh": 120, "mwh_estimate": 160, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-01", "start_construction": "2021-06", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Big Star Solar, LLC (Hybrid)", "name_short": "Big Star Solar, LLC (Hybrid)", "owner": "RWE Renewables Americas, LLC", "state": "texas", "country": "usa", "lat": "29.913908", "long": "-97.289792", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:29.913908+-97.289792", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/rwe-signs-up-corporate-offtaker-for-big-star-texas-solar-plus-storage-project/", "https://www.rwe.com/en/press/rwe-renewables/2021-08-25-rwe-teams-up-with-constellation-to-supply-major-us-commercial-customers-with-solar-energy-from-big-star-facility"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dry Lake", "city": "Clark County", "id": "108", "external_id": "63933", "state": "nevada", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "NV Energy", "developer": "NV Energy", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.419928", "long": "-114.895856", "coords_hint": "1", "use_case": "150mw solar farm support", "notes": "in the planning doc, they list 3 BESS options, picked option 1 for the coordinates (but might be wrong)", "project_website": "", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/2000468/510", "link3": "", "link4": ""}, "internal_id": "108", "external_id": "63933", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Dry Lake Solar Energy Center", "external_id": "63933", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Nevada Power Co", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2023-02", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"DLES1": {"first": {"year": "2023", "month": "12", "entity id": "63603", "entity name": "Nevada Power Company DBA NV Energy", "plant producer type": "Electric Utility", "plant name": "Dry Lake Solar Energy Center", "plant state": "NV", "plant id": "63933", "generator id": "DLES1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63933", "date": "2023-12", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "entity id", "from": "63603", "to": "13407", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Nevada Power Company DBA NV Energy", "to": "Nevada Power Co", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2024-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "13407", "entity name": "Nevada Power Co", "plant producer type": "Electric Utility", "plant name": "Dry Lake Solar Energy Center", "plant state": "NV", "plant id": "63933", "generator id": "DLES1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "63933", "date": "2024-05", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2023-02"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2023-02", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Dry Lake Solar Energy Center", "name_short": "Dry Lake Solar", "owner": "Nevada Power Co", "state": "nevada", "country": "usa", "lat": "36.419928", "long": "-114.895856", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.419928+-114.895856", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["in the planning doc, they list 3 BESS options, picked option 1 for the coordinates (but might be wrong)"], "links": ["https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "https://eplanning.blm.gov/eplanning-ui/project/2000468/510"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "AES Maui Kuihelani Solar Hybrid", "city": "", "id": "211", "external_id": "64256", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "211", "external_id": "64256", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "AES Maui Kuihelani Solar Hybrid", "external_id": "64256", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "AES Distributed Energy", "status": "construction", "date_first_heard": "2021-01", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KLNIB": {"first": {"year": "2022", "month": "12", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Maui Kuihelani Solar Hybrid", "plant state": "HI", "plant id": "64256", "generator id": "KLNIB", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64256", "date": "2022-12", "mw": 60}, "first_month": "2021-01", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2022-12", "to": "2023-10", "extra": "delayed by 10 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-10", "to": "2023-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-12", "to": "2024-05", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "61012", "entity name": "AES Distributed Energy", "plant producer type": "IPP", "plant name": "AES Maui Kuihelani Solar Hybrid", "plant state": "HI", "plant id": "64256", "generator id": "KLNIB", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "64256", "date": "2024-05", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2021-01", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-01", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "AES Maui Kuihelani Solar Hybrid", "name_short": "AES Maui Kuihelani Solar", "owner": "AES Distributed Energy", "state": "hawaii", "country": "usa", "lat": "19.59886628623625", "long": "-155.55347937368438", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:19.59886628623625+-155.55347937368438", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mossy Branch Battery Facility", "city": "", "id": "556", "external_id": "65018", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "65", "customer": "", "owner": "Georgia Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "556", "external_id": "65018", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Mossy Branch Battery Facility", "external_id": "65018", "state": "georgia", "country": "usa", "mwh": 0, "estimate_mwh": 130, "power_mw": 65, "owner": "Georgia Power Co", "status": "construction", "date_first_heard": "2021-11", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2023", "month": "10", "entity id": "7140", "entity name": "Georgia Power Co", "plant producer type": "Electric Utility", "plant name": "Mossy Branch Battery Facility", "plant state": "GA", "plant id": "65018", "generator id": "BESS", "net summer capacity (mw)": "65", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65018", "date": "2023-10", "mw": 65}, "first_month": "2021-11", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2023-10", "to": "2024-05", "extra": "delayed by 7 months", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "5", "entity id": "7140", "entity name": "Georgia Power Co", "plant producer type": "Electric Utility", "plant name": "Mossy Branch Battery Facility", "plant state": "GA", "plant id": "65018", "generator id": "BESS", "net summer capacity (mw)": "65", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65018", "date": "2024-05", "mw": 65}, "current_month": "2024-06", "dates": {"first_heard": "2021-11", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 65, "mwh_is_estimate": true, "mwh": 130, "mwh_estimate": 130, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-11", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Mossy Branch Battery Facility", "name_short": "Mossy Branch Battery Facility", "owner": "Georgia Power Co", "state": "georgia", "country": "usa", "lat": "31.98394488821953", "long": "-81.92751505730502", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.98394488821953+-81.92751505730502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Santa Paula Energy Storage LLC", "city": "", "id": "621", "external_id": "65397", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Santa Paula Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "621", "external_id": "65397", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Santa Paula Energy Storage LLC", "external_id": "65397", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 60, "power_mw": 30, "owner": "Santa Paula Energy Storage, LLC", "status": "construction", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SP1": {"first": {"year": "2022", "month": "11", "entity id": "64740", "entity name": "Santa Paula Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Santa Paula Energy Storage LLC", "plant state": "CA", "plant id": "65397", "generator id": "SP1", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "65397", "date": "2022-11", "mw": 30}, "first_month": "2022-03", "changes": [{"month": "2022-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2022-11", "to": "2023-03", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-03", "to": "2023-09", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64740", "entity name": "Santa Paula Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Santa Paula Energy Storage LLC", "plant state": "CA", "plant id": "65397", "generator id": "SP1", "net summer capacity (mw)": "30", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65397", "date": "2024-05", "mw": 30}, "current_month": "2024-06", "dates": {"first_heard": "2022-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 30, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-03", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Santa Paula Energy Storage LLC", "name_short": "Santa Paula Energy Storage", "owner": "Santa Paula Energy Storage, LLC", "state": "california", "country": "usa", "lat": "41.14183605365125", "long": "-121.2410834959897", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.14183605365125+-121.2410834959897", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vikings Energy Farm", "city": "", "id": "697", "external_id": "65711", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Vikings Energy Farm, LLC", "developer": "arevon", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.804395", "long": "-115.274713", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/viking/", "link1": "https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "link2": "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/", "link3": "", "link4": ""}, "internal_id": "697", "external_id": "65711", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vikings Energy Farm", "external_id": "65711", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Vikings Energy Farm, LLC", "status": "construction", "date_first_heard": "2022-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN2": {"first": {"year": "2023", "month": "12", "entity id": "64966", "entity name": "Vikings Energy Farm, LLC", "plant producer type": "IPP", "plant name": "Vikings Energy Farm", "plant state": "CA", "plant id": "65711", "generator id": "GEN2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65711", "date": "2023-12", "mw": 150}, "first_month": "2022-07", "changes": [{"month": "2023-02", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-08", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-02", "extra": "accelerated by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64966", "entity name": "Vikings Energy Farm, LLC", "plant producer type": "IPP", "plant name": "Vikings Energy Farm", "plant state": "CA", "plant id": "65711", "generator id": "GEN2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65711", "date": "2024-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Vikings Energy Farm", "name_short": "Vikings Energy Farm", "owner": "Vikings Energy Farm, LLC", "state": "california", "country": "usa", "lat": "32.804395", "long": "-115.274713", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.804395+-115.274713", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ortega Grid, LLC", "city": "", "id": "711", "external_id": "65656", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Ortega Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "711", "external_id": "65656", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Ortega Grid, LLC", "external_id": "65656", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 40, "power_mw": 20, "owner": "Ortega Grid, LLC", "status": "construction", "date_first_heard": "2022-06", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HEORG": {"first": {"year": "2023", "month": "3", "entity id": "64935", "entity name": "Ortega Grid, LLC", "plant producer type": "IPP", "plant name": "Ortega Grid, LLC", "plant state": "CA", "plant id": "65656", "generator id": "HEORG", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65656", "date": "2023-03", "mw": 20}, "first_month": "2022-06", "changes": [{"month": "2022-09", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-03", "to": "2023-06", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-08", "to": "2023-11", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2024-01", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-01", "to": "2024-04", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64935", "entity name": "Ortega Grid, LLC", "plant producer type": "IPP", "plant name": "Ortega Grid, LLC", "plant state": "CA", "plant id": "65656", "generator id": "HEORG", "net summer capacity (mw)": "20", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65656", "date": "2024-05", "mw": 20}, "current_month": "2024-06", "dates": {"first_heard": "2022-06", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 20, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-06", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Ortega Grid, LLC", "name_short": "Ortega Grid", "owner": "Ortega Grid, LLC", "state": "california", "country": "usa", "lat": "41.10969828623625", "long": "-121.3399933736844", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.10969828623625+-121.3399933736844", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hecate Energy Desert Storage 1 LLC", "city": "", "id": "712", "external_id": "65635", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Energy Desert Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "712", "external_id": "65635", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Hecate Energy Desert Storage 1 LLC", "external_id": "65635", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Hecate Energy Desert Storage 1 LLC", "status": "construction", "date_first_heard": "2022-06", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HEDS1": {"first": {"year": "2022", "month": "12", "entity id": "64937", "entity name": "Hecate Energy Desert Storage 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Desert Storage 1 LLC", "plant state": "CA", "plant id": "65635", "generator id": "HEDS1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "65635", "date": "2022-12", "mw": 10}, "first_month": "2022-06", "changes": [{"month": "2022-09", "li": [{"name": "date", "from": "2022-12", "to": "2023-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-09", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-01", "to": "2024-05", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64937", "entity name": "Hecate Energy Desert Storage 1 LLC", "plant producer type": "IPP", "plant name": "Hecate Energy Desert Storage 1 LLC", "plant state": "CA", "plant id": "65635", "generator id": "HEDS1", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65635", "date": "2024-05", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2022-06", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-06", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Hecate Energy Desert Storage 1 LLC", "name_short": "Hecate Energy Desert Storage 1", "owner": "Hecate Energy Desert Storage 1 LLC", "state": "california", "country": "usa", "lat": "41.08505874385328", "long": "-121.35182608763999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.08505874385328+-121.35182608763999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carris Storage I", "city": "", "id": "713", "external_id": "65733", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Grid Carris Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "713", "external_id": "65733", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Carris Storage I", "external_id": "65733", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Hecate Grid Carris Storage 1 LLC", "status": "construction", "date_first_heard": "2022-08", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"HECAR": {"first": {"year": "2022", "month": "12", "entity id": "64978", "entity name": "Hecate Grid Carris Storage 1 LLC", "plant producer type": "IPP", "plant name": "Carris Storage I", "plant state": "CA", "plant id": "65733", "generator id": "HECAR", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65733", "date": "2022-12", "mw": 10}, "first_month": "2022-08", "changes": [{"month": "2022-09", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-04", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2022-11", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-09", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-09", "to": "2023-11", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-11", "li": [{"name": "date", "from": "2023-11", "to": "2024-02", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-02", "to": "2024-05", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64978", "entity name": "Hecate Grid Carris Storage 1 LLC", "plant producer type": "IPP", "plant name": "Carris Storage I", "plant state": "CA", "plant id": "65733", "generator id": "HECAR", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65733", "date": "2024-05", "mw": 10}, "current_month": "2024-06", "dates": {"first_heard": "2022-08", "start_construction": "2023-05"}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-08", "start_construction": "2023-05", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Carris Storage I", "name_short": "Carris Storage I", "owner": "Hecate Grid Carris Storage 1 LLC", "state": "california", "country": "usa", "lat": "41.05310153848376", "long": "-121.35059853169716", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.05310153848376+-121.35059853169716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Condor", "city": "", "id": "864", "external_id": "66285", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.020505", "long": "-117.332255", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/condor/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/", "link2": "", "link3": "", "link4": ""}, "internal_id": "864", "external_id": "66285", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Condor Energy Storage LLC", "external_id": "66285", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Condor Energy Storage LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"COND1": {"first": {"year": "2024", "month": "8", "entity id": "65397", "entity name": "Condor Energy Storage LLC", "plant producer type": "IPP", "plant name": "Condor Energy Storage LLC", "plant state": "CA", "plant id": "66285", "generator id": "COND1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66285", "date": "2024-08", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-03", "extra": "accelerated by 5 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65397", "entity name": "Condor Energy Storage LLC", "plant producer type": "IPP", "plant name": "Condor Energy Storage LLC", "plant state": "CA", "plant id": "66285", "generator id": "COND1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66285", "date": "2024-05", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Condor Energy Storage LLC", "name_short": "Condor Energy Storage", "owner": "Condor Energy Storage LLC", "state": "california", "country": "usa", "lat": "34.020505", "long": "-117.332255", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.020505+-117.332255", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Five Wells Solar Center - Hybrid", "city": "", "id": "981", "external_id": "66420", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "518", "power_mw": "259", "customer": "", "owner": "Five Wells Solar Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "981", "external_id": "66420", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Five Wells Solar Center - Hybrid", "external_id": "66420", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 518, "power_mw": 259, "owner": "Five Wells Solar Center, LLC", "status": "construction", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"FWBAT": {"first": {"year": "2024", "month": "3", "entity id": "65502", "entity name": "Five Wells Solar Center, LLC", "plant producer type": "IPP", "plant name": "Five Wells Solar Center - Hybrid", "plant state": "TX", "plant id": "66420", "generator id": "FWBAT", "net summer capacity (mw)": "259", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66420", "date": "2024-03", "mw": 259}, "first_month": "2023-04", "changes": [{"month": "2023-06", "li": [{"name": "entity id", "from": "65502", "to": "65507", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Five Wells Solar Center, LLC", "to": "Chesapeake Solar Project, LLC", "extra": "", "change_type": "misc"}]}, {"month": "2023-08", "li": [{"name": "entity id", "from": "65507", "to": "65502", "extra": "", "change_type": "misc"}, {"name": "entity name", "from": "Chesapeake Solar Project, LLC", "to": "Five Wells Solar Center, LLC", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2023-12", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-01", "to": "2024-02", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65502", "entity name": "Five Wells Solar Center, LLC", "plant producer type": "IPP", "plant name": "Five Wells Solar Center - Hybrid", "plant state": "TX", "plant id": "66420", "generator id": "FWBAT", "net summer capacity (mw)": "259", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66420", "date": "2024-05", "mw": 259}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 259, "mwh_is_estimate": true, "mwh": 518, "mwh_estimate": 518, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Five Wells Solar Center - Hybrid", "name_short": "Five Wells Solar Center", "owner": "Five Wells Solar Center, LLC", "state": "texas", "country": "usa", "lat": "33.51029509297624", "long": "-95.10034571403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.51029509297624+-95.10034571403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cald BESS", "city": "", "id": "1012", "external_id": "66617", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Cald BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1012", "external_id": "66617", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cald BESS", "external_id": "66617", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Cald BESS LLC", "status": "construction", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2024", "month": "5", "entity id": "65643", "entity name": "Cald BESS LLC", "plant producer type": "IPP", "plant name": "Cald BESS", "plant state": "CA", "plant id": "66617", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66617", "date": "2024-05", "mw": 100}, "first_month": "2023-06", "changes": [{"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "5", "entity id": "65643", "entity name": "Cald BESS LLC", "plant producer type": "IPP", "plant name": "Cald BESS", "plant state": "CA", "plant id": "66617", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66617", "date": "2024-05", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Cald BESS", "name_short": "Cald", "owner": "Cald BESS LLC", "state": "california", "country": "usa", "lat": "41.08505874385328", "long": "-121.35182608763999", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.08505874385328+-121.35182608763999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Ford Flat", "city": "", "id": "1020", "external_id": "66669", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "West Ford Flat Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1020", "external_id": "66669", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "West Ford Flat", "external_id": "66669", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "West Ford Flat Energy Storage", "status": "construction", "date_first_heard": "2023-07", "start_construction": "2023-12", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"WFF1": {"first": {"year": "2024", "month": "3", "entity id": "65675", "entity name": "West Ford Flat Energy Storage", "plant producer type": "IPP", "plant name": "West Ford Flat", "plant state": "CA", "plant id": "66669", "generator id": "WFF1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66669", "date": "2024-03", "mw": 25}, "first_month": "2023-07", "changes": [{"month": "2023-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65675", "entity name": "West Ford Flat Energy Storage", "plant producer type": "IPP", "plant name": "West Ford Flat", "plant state": "CA", "plant id": "66669", "generator id": "WFF1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66669", "date": "2024-05", "mw": 25}, "current_month": "2024-06", "dates": {"first_heard": "2023-07", "start_construction": "2023-12"}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-07", "start_construction": "2023-12", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "West Ford Flat", "name_short": "West Ford Flat", "owner": "West Ford Flat Energy Storage", "state": "california", "country": "usa", "lat": "41.122677", "long": "-121.260049", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.260049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bear Canyon", "city": "", "id": "1021", "external_id": "66650", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "13", "customer": "", "owner": "Bear Canyon Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1021", "external_id": "66650", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Bear Canyon", "external_id": "66650", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 26, "power_mw": 13, "owner": "Bear Canyon Energy Storage", "status": "construction", "date_first_heard": "2023-06", "start_construction": "2023-12", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BC1": {"first": {"year": "2024", "month": "3", "entity id": "65674", "entity name": "Bear Canyon Energy Storage", "plant producer type": "IPP", "plant name": "Bear Canyon", "plant state": "CA", "plant id": "66650", "generator id": "BC1", "net summer capacity (mw)": "13", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66650", "date": "2024-03", "mw": 13}, "first_month": "2023-06", "changes": [{"month": "2023-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-05", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65674", "entity name": "Bear Canyon Energy Storage", "plant producer type": "IPP", "plant name": "Bear Canyon", "plant state": "CA", "plant id": "66650", "generator id": "BC1", "net summer capacity (mw)": "13", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66650", "date": "2024-05", "mw": 13}, "current_month": "2024-06", "dates": {"first_heard": "2023-06", "start_construction": "2023-12"}, "month_disappeared": ""}}, "mw": 13, "mwh_is_estimate": true, "mwh": 26, "mwh_estimate": 26, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06", "start_construction": "2023-12", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Bear Canyon", "name_short": "Bear Canyon", "owner": "Bear Canyon Energy Storage", "state": "california", "country": "usa", "lat": "41.14183605365125", "long": "-121.2410834959897", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.14183605365125+-121.2410834959897", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Raceway Solar & Storage", "city": "", "id": "1036", "external_id": "66773", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1036", "external_id": "66773", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Raceway Solar & Storage", "external_id": "66773", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 160, "power_mw": 80, "owner": "AES Clean Energy", "status": "construction", "date_first_heard": "2023-08", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RCWYB": {"first": {"year": "2023", "month": "12", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Raceway Solar & Storage", "plant state": "CA", "plant id": "66773", "generator id": "RCWYB", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66773", "date": "2023-12", "mw": 80}, "first_month": "2023-08", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-12", "to": "2024-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-02", "to": "2024-05", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64904", "entity name": "AES Clean Energy", "plant producer type": "IPP", "plant name": "Raceway Solar & Storage", "plant state": "CA", "plant id": "66773", "generator id": "RCWYB", "net summer capacity (mw)": "80", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66773", "date": "2024-05", "mw": 80}, "current_month": "2024-06", "dates": {"first_heard": "2023-08", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 80, "mwh_is_estimate": true, "mwh": 160, "mwh_estimate": 160, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-08", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Raceway Solar & Storage", "name_short": "Raceway Solar &", "owner": "AES Clean Energy", "state": "california", "country": "usa", "lat": "40.94007414887133", "long": "-121.24071773708002", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.94007414887133+-121.24071773708002", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lockhart ESS, LLC", "city": "", "id": "1181", "external_id": "66946", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "45", "customer": "", "owner": "Terra-Gen Operating Co-Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1181", "external_id": "66946", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Lockhart ESS, LLC", "external_id": "66946", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 90, "power_mw": 45, "owner": "Terra-Gen Operating Co-Solar", "status": "construction", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"LHESS": {"first": {"year": "2024", "month": "6", "entity id": "61950", "entity name": "Terra-Gen Operating Co-Solar", "plant producer type": "IPP", "plant name": "Lockhart ESS, LLC", "plant state": "CA", "plant id": "66946", "generator id": "LHESS", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66946", "date": "2024-06", "mw": 45}, "first_month": "2023-10", "changes": [{"month": "2024-01", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-06", "to": "2024-05", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "61950", "entity name": "Terra-Gen Operating Co-Solar", "plant producer type": "IPP", "plant name": "Lockhart ESS, LLC", "plant state": "CA", "plant id": "66946", "generator id": "LHESS", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "66946", "date": "2024-05", "mw": 45}, "current_month": "2024-06", "dates": {"first_heard": "2023-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 45, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-10", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Lockhart ESS, LLC", "name_short": "Lockhart ESS", "owner": "Terra-Gen Operating Co-Solar", "state": "california", "country": "usa", "lat": "41.17891809297625", "long": "-121.12695671403428", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.17891809297625+-121.12695671403428", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "McLauchin", "city": "", "id": "1183", "external_id": "67041", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1183", "external_id": "67041", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "McLauchin", "external_id": "67041", "state": "north carolina", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "North Carolina El Member Corp", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BAT1": {"first": {"year": "2024", "month": "8", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "McLauchin", "plant state": "NC", "plant id": "67041", "generator id": "BAT1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67041", "date": "2024-08", "mw": 15}, "first_month": "2023-12", "changes": [{"month": "2024-06", "li": [{"name": "date", "from": "2024-08", "to": "2024-05", "extra": "accelerated by 3 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "13683", "entity name": "North Carolina El Member Corp", "plant producer type": "Electric Utility", "plant name": "McLauchin", "plant state": "NC", "plant id": "67041", "generator id": "BAT1", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67041", "date": "2024-05", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "McLauchin", "name_short": "McLauchin", "owner": "North Carolina El Member Corp", "state": "north carolina", "country": "usa", "lat": "36.50887984072874", "long": "-76.7439915329819", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.50887984072874+-76.7439915329819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yellow Pine II", "city": "", "id": "1186", "external_id": "67091", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "106", "power_mw": "53", "customer": "", "owner": "Yellow Pine Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1186", "external_id": "67091", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Yellow Pine II", "external_id": "67091", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 170, "power_mw": 85, "owner": "Yellow Pine Solar II, LLC", "status": "construction", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": true, "pr_url": ""}, "gov_history": {"YP2AB": {"first": {"year": "2024", "month": "5", "entity id": "65968", "entity name": "Yellow Pine Solar II, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine II", "plant state": "NV", "plant id": "67091", "generator id": "YP2AB", "net summer capacity (mw)": "53", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67091", "date": "2024-05", "mw": 53}, "first_month": "2024-01", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "65968", "entity name": "Yellow Pine Solar II, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine II", "plant state": "NV", "plant id": "67091", "generator id": "YP2AB", "net summer capacity (mw)": "53", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67091", "date": "2024-05", "mw": 53}, "current_month": "2024-06", "dates": {"first_heard": "2024-01", "start_construction": null}, "month_disappeared": ""}, "YP2BB": {"first": {"year": "2024", "month": "5", "entity id": "65968", "entity name": "Yellow Pine Solar II, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine II", "plant state": "NV", "plant id": "67091", "generator id": "YP2BB", "net summer capacity (mw)": "32", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67091", "date": "2024-05", "mw": 32}, "first_month": "2024-03", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "65968", "entity name": "Yellow Pine Solar II, LLC", "plant producer type": "IPP", "plant name": "Yellow Pine II", "plant state": "NV", "plant id": "67091", "generator id": "YP2BB", "net summer capacity (mw)": "32", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67091", "date": "2024-05", "mw": 32}, "current_month": "2024-06", "dates": {"first_heard": "2024-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 85, "mwh_is_estimate": true, "mwh": 170, "mwh_estimate": 170, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-01", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Yellow Pine II", "name_short": "Yellow Pine II", "owner": "Yellow Pine Solar II, LLC", "state": "nevada", "country": "usa", "lat": "41.82110450275819", "long": "-114.9962389623575", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.82110450275819+-114.9962389623575", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Copperhead Solar, LLC", "city": "", "id": "1189", "external_id": "67019", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "National Grid Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1189", "external_id": "67019", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Copperhead Solar, LLC", "external_id": "67019", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "National Grid Renewables", "status": "construction", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CHSTG": {"first": {"year": "2024", "month": "3", "entity id": "62759", "entity name": "National Grid Renewables", "plant producer type": "IPP", "plant name": "Copperhead Solar, LLC", "plant state": "TX", "plant id": "67019", "generator id": "CHSTG", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67019", "date": "2024-03", "mw": 100}, "first_month": "2023-12", "changes": [{"month": "2024-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "62759", "entity name": "National Grid Renewables", "plant producer type": "IPP", "plant name": "Copperhead Solar, LLC", "plant state": "TX", "plant id": "67019", "generator id": "CHSTG", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "67019", "date": "2024-05", "mw": 100}, "current_month": "2024-06", "dates": {"first_heard": "2023-12", "start_construction": null}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-12", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Copperhead Solar, LLC", "name_short": "Copperhead Solar", "owner": "National Grid Renewables", "state": "texas", "country": "usa", "lat": "33.56468208398623", "long": "-95.61391623283366", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.56468208398623+-95.61391623283366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Paulsell", "city": "", "id": "1309", "external_id": "67092", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Crow Creek Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1309", "external_id": "67092", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Paulsell", "external_id": "67092", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 30, "power_mw": 15, "owner": "Crow Creek Solar, LLC", "status": "construction", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PSLBA": {"first": {"year": "2024", "month": "2", "entity id": "65965", "entity name": "Crow Creek Solar, LLC", "plant producer type": "IPP", "plant name": "Paulsell", "plant state": "CA", "plant id": "67092", "generator id": "PSLBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "67092", "date": "2024-02", "mw": 15}, "first_month": "2024-02", "changes": [{"month": "2024-04", "li": [{"name": "date", "from": "2024-02", "to": "2024-05", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2024-05", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "5", "entity id": "65965", "entity name": "Crow Creek Solar, LLC", "plant producer type": "IPP", "plant name": "Paulsell", "plant state": "CA", "plant id": "67092", "generator id": "PSLBA", "net summer capacity (mw)": "15", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67092", "date": "2024-05", "mw": 15}, "current_month": "2024-06", "dates": {"first_heard": "2024-02", "start_construction": null}, "month_disappeared": ""}}, "mw": 15, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-02", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Paulsell", "name_short": "Paulsell", "owner": "Crow Creek Solar, LLC", "state": "california", "country": "usa", "lat": "41.183862364886245", "long": "-121.48835819022644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.183862364886245+-121.48835819022644", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Keenesburg Battery Storage", "city": "", "id": "1341", "external_id": "67306", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1341", "external_id": "67306", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Keenesburg Battery Storage", "external_id": "67306", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "United Power, Inc", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KEEBA": {"first": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Keenesburg Battery Storage", "plant state": "CO", "plant id": "67306", "generator id": "KEEBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67306", "date": "2024-05", "mw": 11}, "first_month": "2024-04", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Keenesburg Battery Storage", "plant state": "CO", "plant id": "67306", "generator id": "KEEBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67306", "date": "2024-05", "mw": 11}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Keenesburg Battery Storage", "name_short": "Keenesburg", "owner": "United Power, Inc", "state": "colorado", "country": "usa", "lat": "40.664095733426244", "long": "-102.61966723533789", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.664095733426244+-102.61966723533789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rattlesnake Ridge Battery Storage", "city": "", "id": "1342", "external_id": "67300", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1342", "external_id": "67300", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Rattlesnake Ridge Battery Storage", "external_id": "67300", "state": "colorado", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "United Power, Inc", "status": "construction", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"RATBA": {"first": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Rattlesnake Ridge Battery Storage", "plant state": "CO", "plant id": "67300", "generator id": "RATBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67300", "date": "2024-05", "mw": 11}, "first_month": "2024-04", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "19499", "entity name": "United Power, Inc", "plant producer type": "Electric Utility", "plant name": "Rattlesnake Ridge Battery Storage", "plant state": "CO", "plant id": "67300", "generator id": "RATBA", "net summer capacity (mw)": "11.8", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67300", "date": "2024-05", "mw": 11}, "current_month": "2024-06", "dates": {"first_heard": "2024-04", "start_construction": null}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-04", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Rattlesnake Ridge Battery Storage", "name_short": "Rattlesnake Ridge", "owner": "United Power, Inc", "state": "colorado", "country": "usa", "lat": "40.705461371284265", "long": "-102.6163568926975", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.705461371284265+-102.6163568926975", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cavalry Solar Hybrid", "city": "", "id": "1347", "external_id": "67489", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "45", "customer": "", "owner": "Cavalry Energy Center LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1347", "external_id": "67489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cavalry Solar Hybrid", "external_id": "67489", "state": "indiana", "country": "usa", "mwh": 0, "estimate_mwh": 90, "power_mw": 45, "owner": "Cavalry Energy Center LLC", "status": "construction", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CAVBS": {"first": {"year": "2024", "month": "5", "entity id": "66219", "entity name": "Cavalry Energy Center LLC", "plant producer type": "Electric Utility", "plant name": "Cavalry Solar Hybrid", "plant state": "IN", "plant id": "67489", "generator id": "CAVBS", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67489", "date": "2024-05", "mw": 45}, "first_month": "2024-06", "changes": [], "current": {"year": "2024", "month": "5", "entity id": "66219", "entity name": "Cavalry Energy Center LLC", "plant producer type": "Electric Utility", "plant name": "Cavalry Solar Hybrid", "plant state": "IN", "plant id": "67489", "generator id": "CAVBS", "net summer capacity (mw)": "45", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "ext_id": "67489", "date": "2024-05", "mw": 45}, "current_month": "2024-06", "dates": {"first_heard": "2024-06", "start_construction": null}, "month_disappeared": ""}}, "mw": 45, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2024-06", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Cavalry Solar Hybrid", "name_short": "Cavalry Solar", "owner": "Cavalry Energy Center LLC", "state": "indiana", "country": "usa", "lat": "41.53444497668374", "long": "-85.46987974903644", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.53444497668374+-85.46987974903644", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gateway Energy Project", "city": "London Gateway port/ essex", "id": "57", "external_id": "10309", "state": "", "country": "uk", "capacity_mwh": "900", "estimate_mwh": "", "power_mw": "320", "customer": "Intergen", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Gridstack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.512649", "long": "0.493992", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.intergen.com/our-technologies/development-projects/gateway-energy-centre/", "link1": "https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec", "link2": "", "link3": "", "link4": ""}, "internal_id": "57", "external_id": "10309", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gateway Energy Centre - Battery Energy Storage", "external_id": "10309", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 450, "power_mw": 450, "owner": "Intergen Limited", "status": "planning", "date_first_heard": "2023-01-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.510099", "long": "0.495058", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10309", "Record Last Updated (dd/mm/yyyy)": "17/12/2021", "Operator (or Applicant)": "Gateway Energy Centre Limited", "Site Name": "Baltic Avenue - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "450.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "East 2 Baltic Avenue Stanford Le Hope ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS17 9FF", "X-coordinate": "573240", "Y-coordinate": "181970", "Planning Authority": "Thurrock District Council", "Planning Application Reference": "21/01971/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.510099", "long": "0.495058", "status": "planning", "mw": 450, "ext_id": "10309"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Operator (or Applicant)", "from": "Gateway Energy Centre Limited", "to": "Intergen Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Baltic Avenue - Battery Energy Storage", "to": "Gateway Energy Centre - Battery Energy Storage", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/12/2021", "to": "30/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "13/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/01/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/01/2023", "to": "17/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10309", "Record Last Updated (dd/mm/yyyy)": "17/12/2021", "Operator (or Applicant)": "Intergen Limited", "Site Name": "Gateway Energy Centre - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "450", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East 2 Baltic Avenue Stanford Le Hope ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS17 9FF", "X-coordinate": "573240", "Y-coordinate": "181970", "Planning Authority": "Thurrock District Council", "Planning Application Reference": "21/01971/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/01/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.510099", "long": "0.495058", "status": "planning", "mw": 450, "ext_id": "10309"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 450, "mwh_is_estimate": false, "mwh": 900, "mwh_estimate": 450, "status": "planning", "status_class": "", "date_first_heard": "2023-01-13", "start_construction": "", "start_operation": "", "start_estimated": "2024", "month_disappeared": "", "go_live": "0 ~ 2024", "go_live_year_int": 2024, "name": "Gateway Energy Centre - Battery Energy Storage", "name_short": "Gateway Energy Centre", "owner": "Intergen Limited", "state": "eastern", "country": "uk", "lat": "51.510099", "long": "0.495058", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.510099+0.495058", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Desert Quartize", "city": "Riverside County", "id": "60", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "", "customer": "EDF / Clean Power Alliance", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-15", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.586379", "long": "-114.785106", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "", "link1": "https://eplanning.blm.gov/eplanning-ui/project/68211/570", "link2": "https://www.blm.gov/press-release/blm-approves-desert-quartzite-solar-project-riverside-county", "link3": "https://www.energy-storage.news/california-community-group-signs-ppa-for-edfs-300mw-desert-quartzite-solar-plus-storage-project/", "link4": ""}, "internal_id": "60", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-01-15", "start_construction": "", "start_operation": "", "start_estimated": "2024", "month_disappeared": "", "go_live": "0 ~ 2024", "go_live_year_int": 2024, "name": "Desert Quartize", "name_short": "Desert Quartize", "owner": "", "state": "california", "country": "usa", "lat": "33.586379", "long": "-114.785106", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.586379+-114.785106", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://eplanning.blm.gov/eplanning-ui/project/68211/570", "https://www.blm.gov/press-release/blm-approves-desert-quartzite-solar-project-riverside-county", "https://www.energy-storage.news/california-community-group-signs-ppa-for-edfs-300mw-desert-quartzite-solar-plus-storage-project/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Goyder", "city": "Burra", "id": "567", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "", "estimate_mwh": "1800", "power_mw": "900", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-15", "start_construction": "2022-01-17", "start_operation": "", "start_estimated": "2024", "cost_million": "3000", "cost_currency": "AUD", "cost_incl_solar": "1", "lat": "-33.649566", "long": "139.000287", "coords_hint": "-1", "use_case": "1200MW wind farm support ** 600MW solar support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/neoen-begins-goyder-renewables-zone-wind-solar-storage-hybrid-project-in-south-australia/", "link2": "", "link3": "", "link4": ""}, "internal_id": "567", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 900, "mwh_is_estimate": true, "mwh": 1800, "mwh_estimate": 1800, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-03-15", "start_construction": "2022-01-17", "start_operation": "", "start_estimated": "2024", "month_disappeared": "", "go_live": "0 ~ 2024", "go_live_year_int": 2024, "name": "Goyder", "name_short": "Goyder", "owner": "neoen", "state": "south australia", "country": "australia", "lat": "-33.649566", "long": "139.000287", "coords_hint": -1, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.649566+139.000287", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/neoen-begins-goyder-renewables-zone-wind-solar-storage-hybrid-project-in-south-australia/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Iron Point", "city": "Humboldt County", "id": "106", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "NV Energy", "developer": "Primergy Solar (Quinbrook)", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.900046", "long": "-117.291845", "coords_hint": "1", "use_case": "250MW solar farm support", "notes": "", "project_website": "", "link1": "https://eplanning.blm.gov/eplanning-ui/project/2000966", "link2": "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "link3": "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/", "link4": ""}, "internal_id": "106", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "0 ~ 2023Q4", "go_live_year_int": 2023, "name": "Iron Point", "name_short": "Iron Point", "owner": "NV Energy", "state": "nevada", "country": "usa", "lat": "40.900046", "long": "-117.291845", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.900046+-117.291845", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://eplanning.blm.gov/eplanning-ui/project/2000966", "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rusholme Grange Resubmission", "city": "Selby", "id": "489", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "70", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.73122", "long": "-0.94159", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00", "link3": "", "link4": ""}, "internal_id": "489", "external_id": "9121", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rusholme Grange ", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Harmony Energy Storage", "status": "planning", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9121", "Record Last Updated (dd/mm/yyyy)": "07/06/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rusholme Grange Resubmission", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/0601/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 40, "ext_id": "9121"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2021", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire", "to": "Rusholme Grange, Rusholme Lane, Drax, Selby", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "19/12/2017", "to": "03/09/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Site Name", "from": "Rusholme Grange Resubmission", "to": "Rusholme Grange ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/09/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9121", "Record Last Updated (dd/mm/yyyy)": "13/12/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rusholme Grange ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7093", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/0601/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 40, "ext_id": "9121"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": false, "mwh": 70, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "month_disappeared": "", "go_live": "0 ~ 2023Q3", "go_live_year_int": 2023, "name": "Rusholme Grange ", "name_short": "Rusholme Grange ", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.73117+-0.937436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Torrens Island", "city": "Adelaide", "id": "80", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "AGL Energy Limited", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-09-08", "start_construction": "2021-11-29", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.803262", "long": "138.523477", "coords_hint": "0", "use_case": "", "notes": "might become a 4h / 1000MWh system at a later stage, the coords are probably correct from the satellite image", "project_website": "", "link1": "https://www.wartsila.com/media/news/09-08-2021-agl-and-wartsila-advance-frame-agreement-with-first-energy-storage-project-on-path-to-grid-decarbonisation-2954567", "link2": "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-media-release---agl-breaks-ground-for-torrens-island-grid-sc", "link3": "", "link4": ""}, "internal_id": "80", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-09-08", "start_construction": "2021-11-29", "start_operation": "", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "0 ~ 2023Q1", "go_live_year_int": 2023, "name": "Torrens Island", "name_short": "Torrens Island", "owner": "", "state": "south australia", "country": "australia", "lat": "-34.803262", "long": "138.523477", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.803262+138.523477", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["might become a 4h / 1000MWh system at a later stage, the coords are probably correct from the satellite image"], "links": ["https://www.wartsila.com/media/news/09-08-2021-agl-and-wartsila-advance-frame-agreement-with-first-energy-storage-project-on-path-to-grid-decarbonisation-2954567", "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-media-release---agl-breaks-ground-for-torrens-island-grid-sc"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Poolbeg", "city": "Dublin", "id": "120", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "75", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.338696", "long": "-6.205066", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://blog.fluenceenergy.com/esb-fluence-complete-deal-largest-energy-storage-portfolio-europe", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "120", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 75, "mwh_is_estimate": false, "mwh": 150, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "0 ~ 2023Q1", "go_live_year_int": 2023, "name": "Poolbeg", "name_short": "Poolbeg", "owner": "ESB", "state": "", "country": "ireland", "lat": "53.338696", "long": "-6.205066", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.338696+-6.205066", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Wall", "city": "Dublin", "id": "121", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "60", "estimate_mwh": "", "power_mw": "30", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.338662", "long": "-6.191852", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://blog.fluenceenergy.com/esb-fluence-complete-deal-largest-energy-storage-portfolio-europe", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "121", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 30, "mwh_is_estimate": false, "mwh": 60, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "0 ~ 2023Q1", "go_live_year_int": 2023, "name": "South Wall", "name_short": "South Wall", "owner": "ESB", "state": "", "country": "ireland", "lat": "53.338662", "long": "-6.191852", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.338662+-6.191852", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Boulder Solar III", "city": "Clark County", "id": "109", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "232", "estimate_mwh": "", "power_mw": "58", "customer": "", "owner": "NV Energy", "developer": "174 PowerGlobal / KOMIPO", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.827801", "long": "-114.947397", "coords_hint": "0", "use_case": "128MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "", "link3": "", "link4": ""}, "internal_id": "109", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 58, "mwh_is_estimate": false, "mwh": 232, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "month_disappeared": "", "go_live": "0 ~ 2023", "go_live_year_int": 2023, "name": "Boulder Solar III", "name_short": "Boulder Solar III", "owner": "NV Energy", "state": "nevada", "country": "usa", "lat": "35.827801", "long": "-114.947397", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.827801+-114.947397", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Great Western Battery", "city": "Wallerawang", "id": "568", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "500", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-18", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.397397", "long": "150.067853", "coords_hint": "1", "use_case": "coal plant replacement", "notes": "exact location from scoping report pdf", "project_website": "https://greatwesternbattery.com.au", "link1": "https://www.energy-storage.news/great-western-battery-1000mwh-project-proposed-to-aid-reliability-in-australias-post-coal-age/", "link2": "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "link3": "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-12346552%2120201223T043129.182%20GMT", "link4": ""}, "internal_id": "568", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 500, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-01-18", "start_construction": "", "start_operation": "", "start_estimated": "2023", "month_disappeared": "", "go_live": "0 ~ 2023", "go_live_year_int": 2023, "name": "Great Western Battery", "name_short": "Great Western Battery", "owner": "neoen", "state": "new south wales", "country": "australia", "lat": "-33.397397", "long": "150.067853", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.397397+150.067853", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["exact location from scoping report pdf"], "links": ["https://www.energy-storage.news/great-western-battery-1000mwh-project-proposed-to-aid-reliability-in-australias-post-coal-age/", "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-12346552%2120201223T043129.182%20GMT"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wallerawang 9", "city": "Wallerawang", "id": "569", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "500", "customer": "", "owner": "greenspot", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "400", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "-33.407503", "long": "150.091529", "coords_hint": "1", "use_case": "coal plant replacement", "notes": "exact location from the pdf in sources", "project_website": "https://www.greenspot.com.au/news/wallerawang-9-battery-project-scoping-report/", "link1": "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "link2": "https://www.greenspot.com.au/news/uploads/wallerawang-9-battery-project-scoping-report.pdf", "link3": "", "link4": ""}, "internal_id": "569", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 500, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "2023", "month_disappeared": "", "go_live": "0 ~ 2023", "go_live_year_int": 2023, "name": "Wallerawang 9", "name_short": "Wallerawang 9", "owner": "greenspot", "state": "new south wales", "country": "australia", "lat": "-33.407503", "long": "150.091529", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.407503+150.091529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["exact location from the pdf in sources"], "links": ["https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "https://www.greenspot.com.au/news/uploads/wallerawang-9-battery-project-scoping-report.pdf"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jicarilla", "city": "", "id": "102", "external_id": "", "state": "new mexico", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "93", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.269283", "long": "-107.562816", "coords_hint": "0", "use_case": "50MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, "internal_id": "102", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "0 ~ 2022Q4", "go_live_year_int": 2022, "name": "Jicarilla", "name_short": "Jicarilla", "owner": "", "state": "new mexico", "country": "usa", "lat": "36.269283", "long": "-107.562816", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.269283+-107.562816", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "201LC 8me", "city": "", "id": "104", "external_id": "", "state": "new mexico", "country": "usa", "capacity_mwh": "120", "estimate_mwh": "", "power_mw": "30", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "188", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.619911", "long": "-107.815013", "coords_hint": "0", "use_case": "100MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, "internal_id": "104", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 30, "mwh_is_estimate": false, "mwh": 120, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "0 ~ 2022Q4", "go_live_year_int": 2022, "name": "201LC 8me", "name_short": "201LC 8me", "owner": "", "state": "new mexico", "country": "usa", "lat": "35.619911", "long": "-107.815013", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.619911+-107.815013", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thailand (name tbd)", "city": "", "id": "134", "external_id": "", "state": "", "country": "thailand", "capacity_mwh": "136", "estimate_mwh": "", "power_mw": "45", "customer": "", "owner": "Super Energy", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "14.334678", "long": "100.052398", "coords_hint": "0", "use_case": "49MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/sungrow-is-supplier-to-thai-solar-plus-storage-project-featuring-southeast-asias-biggest-bess/", "link2": "", "link3": "", "link4": ""}, "internal_id": "134", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 45, "mwh_is_estimate": false, "mwh": 136, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "0 ~ 2022Q4", "go_live_year_int": 2022, "name": "Thailand (name tbd)", "name_short": "Thailand (name tbd)", "owner": "Super Energy", "state": "", "country": "thailand", "lat": "14.334678", "long": "100.052398", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:14.334678+100.052398", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/sungrow-is-supplier-to-thai-solar-plus-storage-project-featuring-southeast-asias-biggest-bess/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Waikato (name tbd)", "city": "", "id": "137", "external_id": "", "state": "", "country": "new zealand", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "WEL Networks", "developer": "Infratec", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-10-18", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "17", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "-37.519913", "long": "175.054654", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/new-zealands-first-grid-scale-battery-storage-system-project-nears-start-of-construction/", "link2": "", "link3": "", "link4": ""}, "internal_id": "137", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 35, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2021-10-18", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Waikato (name tbd)", "name_short": "Waikato (name tbd)", "owner": "WEL Networks", "state": "", "country": "new zealand", "lat": "-37.519913", "long": "175.054654", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-37.519913+175.054654", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/new-zealands-first-grid-scale-battery-storage-system-project-nears-start-of-construction/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hazelwood", "city": "LaTrobe Valley", "id": "138", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "Macquarie\u2019s Green Investment Group / Engie", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-12-01", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.271456", "long": "146.390309", "coords_hint": "0", "use_case": "at coal power plant", "notes": "will benefit from unused transmission capacity of old power plant", "project_website": "", "link1": "https://www.energy-storage.news/150mw-privately-funded-battery-project-is-latest-in-australia-to-repurpose-fossil-fuel-plant-site/", "link2": "", "link3": "", "link4": ""}, "internal_id": "138", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 150, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2021-12-01", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Hazelwood", "name_short": "Hazelwood", "owner": "Macquarie\u2019s Green Investment Group / Engie", "state": "victoria", "country": "australia", "lat": "-38.271456", "long": "146.390309", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-38.271456+146.390309", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["will benefit from unused transmission capacity of old power plant"], "links": ["https://www.energy-storage.news/150mw-privately-funded-battery-project-is-latest-in-australia-to-repurpose-fossil-fuel-plant-site/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vilnius", "city": "", "id": "139", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "54.651925", "long": "25.240645", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, "internal_id": "139", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Vilnius", "name_short": "Vilnius", "owner": "EPSO-G / Energy Cells", "state": "", "country": "lithuania", "lat": "54.651925", "long": "25.240645", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.651925+25.240645", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["split capacity and costs in 4 projects, only the sum mentioned in article"], "links": ["https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Siauliai", "city": "", "id": "140", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "55.916586", "long": "23.307078", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, "internal_id": "140", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Siauliai", "name_short": "Siauliai", "owner": "EPSO-G / Energy Cells", "state": "", "country": "lithuania", "lat": "55.916586", "long": "23.307078", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.916586+23.307078", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["split capacity and costs in 4 projects, only the sum mentioned in article"], "links": ["https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alytus", "city": "", "id": "141", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "54.405809", "long": "24.011371", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, "internal_id": "141", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Alytus", "name_short": "Alytus", "owner": "EPSO-G / Energy Cells", "state": "", "country": "lithuania", "lat": "54.405809", "long": "24.011371", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.405809+24.011371", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["split capacity and costs in 4 projects, only the sum mentioned in article"], "links": ["https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Utena", "city": "", "id": "142", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "55.505378", "long": "25.595541", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, "internal_id": "142", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "month_disappeared": "", "go_live": "0 ~ 2022Q3", "go_live_year_int": 2022, "name": "Utena", "name_short": "Utena", "owner": "EPSO-G / Energy Cells", "state": "", "country": "lithuania", "lat": "55.505378", "long": "25.595541", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.505378+25.595541", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["split capacity and costs in 4 projects, only the sum mentioned in article"], "links": ["https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edwards Sanborn Solar Storage", "city": "Kern County", "id": "68", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "2445", "estimate_mwh": "", "power_mw": "346", "customer": "Terra-Gen", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "LG & Samsung", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-12-10", "start_construction": "2021-02-01", "start_operation": "", "start_estimated": "2022Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.911468", "long": "-117.889716", "coords_hint": "0", "use_case": "1118 MW solar farm support", "notes": "735 MWh in Q3 '21, 1501 MWh by Q2 2022.", "project_website": "", "link1": "https://renewablesnow.com/news/terra-gen-secures-usd-800m-for-massive-solar-storage-project-in-california-749635/", "link2": "https://pv-magazine-usa.com/2021/08/02/terra-gen-secures-800-million-in-financing-for-solar-storage-project-in-california/", "link3": "https://pv-magazine-usa.com/2020/12/11/morning-brief-big-home-batteries-from-lg-energy-terra-gen-and-mortenson-start-on-worlds-largest-standalone-solar-and-storage-project/", "link4": ""}, "internal_id": "68", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 346, "mwh_is_estimate": false, "mwh": 2445, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-12-10", "start_construction": "2021-02-01", "start_operation": "", "start_estimated": "2022Q2", "month_disappeared": "", "go_live": "0 ~ 2022Q2", "go_live_year_int": 2022, "name": "Edwards Sanborn Solar Storage", "name_short": "Edwards Sanborn Solar", "owner": "", "state": "california", "country": "usa", "lat": "34.911468", "long": "-117.889716", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.911468+-117.889716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["735 MWh in Q3 '21, 1501 MWh by Q2 2022."], "links": ["https://renewablesnow.com/news/terra-gen-secures-usd-800m-for-massive-solar-storage-project-in-california-749635/", "https://pv-magazine-usa.com/2021/08/02/terra-gen-secures-800-million-in-financing-for-solar-storage-project-in-california/", "https://pv-magazine-usa.com/2020/12/11/morning-brief-big-home-batteries-from-lg-energy-terra-gen-and-mortenson-start-on-worlds-largest-standalone-solar-and-storage-project/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aghada", "city": "Cork", "id": "122", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "38", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.833728", "long": "-8.237095", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.pv-magazine.com/2021/01/08/irish-esb-to-add-100-mwh-of-fluence-storage-to-its-portfolio/", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "122", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 38, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "month_disappeared": "", "go_live": "0 ~ 2022Q1", "go_live_year_int": 2022, "name": "Aghada", "name_short": "Aghada", "owner": "ESB", "state": "", "country": "ireland", "lat": "51.833728", "long": "-8.237095", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.833728+-8.237095", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Inchicore", "city": "Dublin", "id": "123", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "60", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.335521", "long": "-6.336714", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.pv-magazine.com/2021/01/08/irish-esb-to-add-100-mwh-of-fluence-storage-to-its-portfolio/", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "123", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 60, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "month_disappeared": "", "go_live": "0 ~ 2022Q1", "go_live_year_int": 2022, "name": "Inchicore", "name_short": "Inchicore", "owner": "ESB", "state": "", "country": "ireland", "lat": "53.335521", "long": "-6.336714", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.335521+-6.336714", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Burwell", "city": "Burwell", "id": "125", "external_id": "7272", "state": "cambridgeshire", "country": "uk", "capacity_mwh": "56", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "SMS Plc", "manufacturer": "Trina Storage / CATL", "type": "", "cells": "CATL LFP", "no_of_battery_units": "157", "status": "construction", "date_first_heard": "2021-10-12", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.27859", "long": "0.316193", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/energy-storage-product-launches-in-europe-from-major-chinese-solar-companies-trina-sungrow/", "link2": "https://www.youtube.com/watch?v=PT1vRQdYuzE", "link3": "", "link4": ""}, "internal_id": "125", "external_id": "7272", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Burwell Main Sub-Station", "external_id": "7272", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Aura Power / Pivot Power", "status": "planning", "date_first_heard": "2019-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.279248", "long": "0.314266", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7272", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Aura Power / Pivot Power", "Site Name": "Burwell Main Sub-Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, Cambridgeshire", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0BP", "X-coordinate": "557976", "Y-coordinate": "267089", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "19/00155/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.279248", "long": "0.314266", "status": "planning", "mw": 49, "ext_id": "7272"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, Cambridgeshire", "to": "Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "29/04/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7272", "Record Last Updated (dd/mm/yyyy)": "29/04/2019", "Operator (or Applicant)": "Aura Power / Pivot Power", "Site Name": "Burwell Main Sub-Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9292", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0BP", "X-coordinate": "557976", "Y-coordinate": "267089", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "19/00155/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.279248", "long": "0.314266", "status": "planning", "mw": 49, "ext_id": "7272"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 56, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-04-29", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "month_disappeared": "", "go_live": "0 ~ 2022Q1", "go_live_year_int": 2022, "name": "Burwell Main Sub-Station", "name_short": "Burwell Main Sub-Station", "owner": "Aura Power / Pivot Power", "state": "eastern", "country": "uk", "lat": "52.279248", "long": "0.314266", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.279248+0.314266", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 157, "notes_split": [""], "links": ["https://www.energy-storage.news/energy-storage-product-launches-in-europe-from-major-chinese-solar-companies-trina-sungrow/", "https://www.youtube.com/watch?v=PT1vRQdYuzE"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Werne", "city": "Werne", "id": "83", "external_id": "SEE971932533266", "state": "nrw", "country": "germany", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "72", "customer": "RWE", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-26", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.674854", "long": "7.712175", "coords_hint": "0", "use_case": "frequency balancing", "notes": "", "project_website": "", "link1": "https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "link2": "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "link3": "", "link4": ""}, "internal_id": "83", "external_id": "SEE971932533266", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicher Werne", "external_id": "SEE971932533266", "state": "nrw", "country": "germany", "mwh": 72, "estimate_mwh": "", "power_mw": 72, "owner": "RWE Generation SE", "status": "planning", "date_first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31", "month_disappeared": "", "lat": "51.673240", "long": "7.710467", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4667306"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE971932533266", "DatumLetzteAktualisierung": "2021-09-27T10:17:37.0101370", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR907042335667", "Land": "84", "Bundesland": "1409", "Landkreis": "Unna", "Gemeinde": "Werne", "Gemeindeschluessel": "05978040", "Postleitzahl": "59368", "Strasse": "Hammer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Werne", "Laengengrad": "7.710467", "Breitengrad": "51.673240", "Registrierungsdatum": "2021-09-27", "GeplantesInbetriebnahmedatum": "2022-12-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Werne", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "72500.000", "Nettonennleistung": "72500.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911844000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "100000.000", "SpeMastrNummer": "SSE949518558477", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 72, "pr_url_id": "4667306", "ext_id": "SEE971932533266", "mw": 72, "status": "planning"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE971932533266", "DatumLetzteAktualisierung": "2021-09-27T10:17:37.0101370", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR907042335667", "Land": "84", "Bundesland": "1409", "Landkreis": "Unna", "Gemeinde": "Werne", "Gemeindeschluessel": "05978040", "Postleitzahl": "59368", "Strasse": "Hammer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "2", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Werne", "Laengengrad": "7.710467", "Breitengrad": "51.673240", "Registrierungsdatum": "2021-09-27", "GeplantesInbetriebnahmedatum": "2022-12-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Werne", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "72500.000", "Nettonennleistung": "72500.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911844000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "100000.000", "SpeMastrNummer": "SSE949518558477", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4667306", "owner": "RWE Generation SE", "mwh": 72, "ext_id": "SEE971932533266", "mw": 72, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31"}}, "mw": 72, "mwh_is_estimate": false, "mwh": 72, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31", "month_disappeared": "", "go_live": "0 ~ 2022-12", "go_live_year_int": 2022, "name": "Batteriespeicher Werne", "name_short": "Batteriespeicher Werne", "owner": "RWE Generation SE", "state": "nrw", "country": "germany", "lat": "51.673240", "long": "7.710467", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.673240+7.710467", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4667306"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lingen / Emsland", "city": "Lingen", "id": "84", "external_id": "SEE905843309764", "state": "lower saxony", "country": "germany", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "45", "customer": "RWE", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-26", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.481565", "long": "7.300968", "coords_hint": "0", "use_case": "frequency balancing", "notes": "", "project_website": "", "link1": "https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "link2": "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "link3": "", "link4": ""}, "internal_id": "84", "external_id": "SEE905843309764", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Batteriespeicher Emsland", "external_id": "SEE905843309764", "state": "lower saxony", "country": "germany", "mwh": 45, "estimate_mwh": "", "power_mw": 45, "owner": "RWE Generation SE", "status": "planning", "date_first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31", "month_disappeared": "", "lat": "52.480270", "long": "7.305250", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4667064"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE905843309764", "DatumLetzteAktualisierung": "2021-09-27T10:11:20.2519577", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR907042335667", "Land": "84", "Bundesland": "1408", "Landkreis": "Emsland", "Gemeinde": "Lingen (Ems)", "Gemeindeschluessel": "03454032", "Postleitzahl": "49808", "Strasse": "Sch\u00fcttorfer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "100", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Lingen", "Laengengrad": "7.305250", "Breitengrad": "52.480270", "Registrierungsdatum": "2021-09-27", "GeplantesInbetriebnahmedatum": "2022-12-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Emsland", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "45000.000", "Nettonennleistung": "45000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911844000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "62000.000", "SpeMastrNummer": "SSE975030047267", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 45, "pr_url_id": "4667064", "ext_id": "SEE905843309764", "mw": 45, "status": "planning"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE905843309764", "DatumLetzteAktualisierung": "2021-09-27T10:11:20.2519577", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR907042335667", "Land": "84", "Bundesland": "1408", "Landkreis": "Emsland", "Gemeinde": "Lingen (Ems)", "Gemeindeschluessel": "03454032", "Postleitzahl": "49808", "Strasse": "Sch\u00fcttorfer Stra\u00dfe", "StrasseNichtGefunden": "0", "Hausnummer": "100", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Lingen", "Laengengrad": "7.305250", "Breitengrad": "52.480270", "Registrierungsdatum": "2021-09-27", "GeplantesInbetriebnahmedatum": "2022-12-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Batteriespeicher Emsland", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "45000.000", "Nettonennleistung": "45000.000", "AnschlussAnHoechstOderHochSpannung": "1", "Einsatzverantwortlicher": "9911844000000", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "62000.000", "SpeMastrNummer": "SSE975030047267", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4667064", "owner": "RWE Generation SE", "mwh": 45, "ext_id": "SEE905843309764", "mw": 45, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31"}}, "mw": 45, "mwh_is_estimate": false, "mwh": 45, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-09-27", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-31", "month_disappeared": "", "go_live": "0 ~ 2022-12", "go_live_year_int": 2022, "name": "Batteriespeicher Emsland", "name_short": "Batteriespeicher Emsland", "owner": "RWE Generation SE", "state": "lower saxony", "country": "germany", "lat": "52.480270", "long": "7.305250", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.480270+7.305250", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4667064"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SMAREG4 Wartburgspeicher Eisenach", "city": "", "id": "839", "external_id": "SEE954649497618", "state": "thuringia", "country": "germany", "capacity_mwh": "67", "estimate_mwh": "", "power_mw": "60", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "839", "external_id": "SEE954649497618", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "SMAREG4 Wartburgspeicher Eisenach", "external_id": "SEE954649497618", "state": "thuringia", "country": "germany", "mwh": 67, "estimate_mwh": "", "power_mw": 60, "owner": "SMAREG4", "status": "planning", "date_first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01", "month_disappeared": "", "lat": "51.000210", "long": "10.231150", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5405677"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE954649497618", "DatumLetzteAktualisierung": "2022-11-16T09:47:55.0954518", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR989644624141", "Land": "84", "Bundesland": "1415", "Landkreis": "Eisenach", "Gemeinde": "Eisenach", "Gemeindeschluessel": "16056000", "Postleitzahl": "99817", "Gemarkung": "Stockhausen", "FlurFlurstuecknummern": "Flur 4: 251/4", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Eisenach", "Laengengrad": "10.231150", "Breitengrad": "51.000210", "Registrierungsdatum": "2022-10-18", "GeplantesInbetriebnahmedatum": "2022-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "SMAREG4 Wartburgspeicher Eisenach", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "60000.000", "Nettonennleistung": "60000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE981203149492", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "1", "ZugeordnenteWirkleistungWechselrichter": "60000.000", "SpeMastrNummer": "SSE924723418167", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5405677", "owner": "SMAREG4", "mwh": 67, "ext_id": "SEE954649497618", "mw": 60, "status": "planning"}, "first_month": "2022-12", "changes": [], "current": {"EinheitMastrNummer": "SEE954649497618", "DatumLetzteAktualisierung": "2022-11-16T09:47:55.0954518", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR989644624141", "Land": "84", "Bundesland": "1415", "Landkreis": "Eisenach", "Gemeinde": "Eisenach", "Gemeindeschluessel": "16056000", "Postleitzahl": "99817", "Gemarkung": "Stockhausen", "FlurFlurstuecknummern": "Flur 4: 251/4", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Eisenach", "Laengengrad": "10.231150", "Breitengrad": "51.000210", "Registrierungsdatum": "2022-10-18", "GeplantesInbetriebnahmedatum": "2022-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "SMAREG4 Wartburgspeicher Eisenach", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "60000.000", "Nettonennleistung": "60000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "Einspeisungsart": "688", "GenMastrNummer": "SGE981203149492", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "1", "ZugeordnenteWirkleistungWechselrichter": "60000.000", "SpeMastrNummer": "SSE924723418167", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "5405677", "owner": "SMAREG4", "mwh": 67, "ext_id": "SEE954649497618", "mw": 60, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01"}}, "mw": 60, "mwh_is_estimate": false, "mwh": 67, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01", "month_disappeared": "", "go_live": "0 ~ 2022-12", "go_live_year_int": 2022, "name": "SMAREG4 Wartburgspeicher Eisenach", "name_short": "SMAREG4 Wartburgspeicher Eisenach", "owner": "SMAREG4", "state": "thuringia", "country": "germany", "lat": "51.000210", "long": "10.231150", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.000210+10.231150", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/5405677"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Buffalo", "city": "", "id": "257", "external_id": "", "state": "", "country": "netherlands", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "GIGA Storage", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "LFP", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.985216", "long": "5.665107", "coords_hint": "2", "use_case": "", "notes": "storage will be rented out to Eneco, STAAS: storage as a service", "project_website": "", "link1": "https://www.energy-storage.news/wartsilas-48mwh-netherlands-bess-will-be-europes-first-large-scale-lfp-battery-project/", "link2": "", "link3": "", "link4": ""}, "internal_id": "257", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 48, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "month_disappeared": "", "go_live": "0 ~ 2022-10", "go_live_year_int": 2022, "name": "Buffalo", "name_short": "Buffalo", "owner": "GIGA Storage", "state": "", "country": "netherlands", "lat": "51.985216", "long": "5.665107", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.985216+5.665107", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["storage will be rented out to Eneco, STAAS: storage as a service"], "links": ["https://www.energy-storage.news/wartsilas-48mwh-netherlands-bess-will-be-europes-first-large-scale-lfp-battery-project/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "B\u00fcttel Speicher", "city": "", "id": "546", "external_id": "SEE984446277410", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "546", "external_id": "SEE984446277410", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "B\u00fcttel Speicher", "external_id": "SEE984446277410", "state": "schleswig-holstein", "country": "germany", "mwh": 4, "estimate_mwh": "", "power_mw": 13, "owner": "ENERPARC Solar Invest 184 GmbH", "status": "planning", "date_first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31", "month_disappeared": "", "lat": "53.913862", "long": "9.218432", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3370616"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE984446277410", "DatumLetzteAktualisierung": "2020-08-26T09:44:58.0831462", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR920405658623", "Land": "84", "Bundesland": "1411", "Landkreis": "Steinburg", "Gemeinde": "B\u00fcttel", "Gemeindeschluessel": "01061020", "Postleitzahl": "25572", "Gemarkung": "B\u00fcttel", "FlurFlurstuecknummern": "Flur3: 56/5, 37/3, 43/1, 42/2, 134/34, 155/27, 29/13, 42/4, 59, 85/58, 37/2, 32/2, 25/5, 36/3, 29/3, 62/3, 141/44, 11/16, 142/49.\r\nFlur8: 28/3, 31/5, 16/3.", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "B\u00fcttel", "Laengengrad": "9.218432", "Breitengrad": "53.913862", "Registrierungsdatum": "2020-08-26", "GeplantesInbetriebnahmedatum": "2022-08-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "B\u00fcttel Speicher", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "14574.000", "Nettonennleistung": "13200.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13200.000", "SpeMastrNummer": "SSE920345289949", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 4, "pr_url_id": "3370616", "ext_id": "SEE984446277410", "mw": 13, "status": "planning"}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-08-26T09:44:58.0831462", "to": "2022-01-27T13:56:34.4520410", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE984446277410", "DatumLetzteAktualisierung": "2022-01-27T13:56:34.4520410", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR920405658623", "Land": "84", "Bundesland": "1411", "Landkreis": "Steinburg", "Gemeinde": "B\u00fcttel", "Gemeindeschluessel": "01061020", "Postleitzahl": "25572", "Gemarkung": "B\u00fcttel", "FlurFlurstuecknummern": "Flur3: 56/5, 37/3, 43/1, 42/2, 134/34, 155/27, 29/13, 42/4, 59, 85/58, 37/2, 32/2, 25/5, 36/3, 29/3, 62/3, 141/44, 11/16, 142/49.\r\nFlur8: 28/3, 31/5, 16/3.", "StrasseNichtGefunden": "0", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "B\u00fcttel", "Laengengrad": "9.218432", "Breitengrad": "53.913862", "Registrierungsdatum": "2020-08-26", "GeplantesInbetriebnahmedatum": "2022-08-31", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "B\u00fcttel Speicher", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "14574.000", "Nettonennleistung": "13200.000", "AnschlussAnHoechstOderHochSpannung": "1", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "0", "Einspeisungsart": "688", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "13200.000", "SpeMastrNummer": "SSE920345289949", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3370616", "owner": "ENERPARC Solar Invest 184 GmbH", "mwh": 4, "ext_id": "SEE984446277410", "mw": 13, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31"}}, "mw": 13, "mwh_is_estimate": false, "mwh": 4, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31", "month_disappeared": "", "go_live": "0 ~ 2022-08", "go_live_year_int": 2022, "name": "B\u00fcttel Speicher", "name_short": "B\u00fcttel Speicher", "owner": "ENERPARC Solar Invest 184 GmbH", "state": "schleswig-holstein", "country": "germany", "lat": "53.913862", "long": "9.218432", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.913862+9.218432", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3370616"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "WBS-Tarzow", "city": "", "id": "534", "external_id": "SEE937857006797", "state": "mecklenburg-vorpommern", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "534", "external_id": "SEE937857006797", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "WBS-Tarzow", "external_id": "SEE937857006797", "state": "mecklenburg-vorpommern", "country": "germany", "mwh": 10, "estimate_mwh": "", "power_mw": 10, "owner": "KNE Windpark Nr. 12 GmbH \uff06 Co. KG", "status": "planning", "date_first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01", "month_disappeared": "", "lat": "53.813797", "long": "11.581984", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3371345"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE937857006797", "DatumLetzteAktualisierung": "2020-08-31T06:05:26.1054583", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR901241927012", "Land": "84", "Bundesland": "1407", "Landkreis": "Nordwestmecklenburg", "Gemeinde": "L\u00fcbow", "Gemeindeschluessel": "13074047", "Postleitzahl": "23972", "Strasse": "Tarzow", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "1", "Ort": "L\u00fcbow", "Laengengrad": "11.581984", "Breitengrad": "53.813797", "Registrierungsdatum": "2020-08-25", "GeplantesInbetriebnahmedatum": "2022-02-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "DatumDesBetreiberwechsels": "2020-08-31", "DatumRegistrierungDesBetreiberwechsels": "2020-08-31", "NameStromerzeugungseinheit": "WBS-Tarzow", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11000.000", "SpeMastrNummer": "SSE909091437262", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 10, "pr_url_id": "3371345", "ext_id": "SEE937857006797", "mw": 10, "status": "planning"}, "first_month": "2021-11", "changes": [{"month": "2022-05", "li": [{"name": "DatumLetzteAktualisierung", "from": "2020-08-31T06:05:26.1054583", "to": "2022-02-15T06:25:54.4267956", "extra": "", "change_type": "misc"}, {"name": "GeplantesInbetriebnahmedatum", "from": "2022-02-01", "to": "2023-04-30", "extra": "", "change_type": "misc"}]}], "current": {"EinheitMastrNummer": "SEE937857006797", "DatumLetzteAktualisierung": "2022-02-15T06:25:54.4267956", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR901241927012", "Land": "84", "Bundesland": "1407", "Landkreis": "Nordwestmecklenburg", "Gemeinde": "L\u00fcbow", "Gemeindeschluessel": "13074047", "Postleitzahl": "23972", "Strasse": "Tarzow", "StrasseNichtGefunden": "0", "Hausnummer_nv": "1", "HausnummerNichtGefunden": "1", "Ort": "L\u00fcbow", "Laengengrad": "11.581984", "Breitengrad": "53.813797", "Registrierungsdatum": "2020-08-25", "GeplantesInbetriebnahmedatum": "2023-04-30", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "DatumDesBetreiberwechsels": "2020-08-31", "DatumRegistrierungDesBetreiberwechsels": "2020-08-31", "NameStromerzeugungseinheit": "WBS-Tarzow", "Weic_nv": "1", "Kraftwerksnummer_nv": "1", "Energietraeger": "2496", "Bruttoleistung": "10000.000", "Nettonennleistung": "10000.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "1", "FernsteuerbarkeitDv": "1", "FernsteuerbarkeitDr": "1", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "11000.000", "SpeMastrNummer": "SSE909091437262", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "3371345", "owner": "KNE Windpark Nr. 12 GmbH \uff06 Co. KG", "mwh": 10, "ext_id": "SEE937857006797", "mw": 10, "status": "planning"}, "current_month": "2022-12", "dates": {"first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01"}}, "mw": 10, "mwh_is_estimate": false, "mwh": 10, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01", "month_disappeared": "", "go_live": "0 ~ 2022-02", "go_live_year_int": 2022, "name": "WBS-Tarzow", "name_short": "WBS-Tarzow", "owner": "KNE Windpark Nr. 12 GmbH \uff06 Co. KG", "state": "mecklenburg-vorpommern", "country": "germany", "lat": "53.813797", "long": "11.581984", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.813797+11.581984", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/3371345"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Oakland", "city": "Oakland", "id": "39", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "36", "estimate_mwh": "", "power_mw": "145", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.79422", "long": "-122.20837", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "39", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 145, "mwh_is_estimate": false, "mwh": 36, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "month_disappeared": "", "go_live": "0 ~ 2022", "go_live_year_int": 2022, "name": "Oakland", "name_short": "Oakland", "owner": "", "state": "california", "country": "usa", "lat": "37.79422", "long": "-122.20837", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:37.79422+-122.20837", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Im Buckeberg 62 Stromspeicher", "city": "", "id": "537", "external_id": "SEE946919525862", "state": "baden-wuerttemberg", "country": "germany", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "537", "external_id": "SEE946919525862", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "de_mastr", "name": "Im Buckeberg 62 Stromspeicher", "external_id": "SEE946919525862", "state": "baden-wuerttemberg", "country": "germany", "mwh": 13, "estimate_mwh": "", "power_mw": 13, "owner": "", "status": "planning", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01", "month_disappeared": "", "lat": "48.914035", "long": "8.524357", "coords_hint": 1, "has_multiple_projects": false, "pr_url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4680516"}, "gov_history": {"first": {"EinheitMastrNummer": "SEE946919525862", "DatumLetzteAktualisierung": "2021-10-04T16:36:44.0149153", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR937155736822", "Land": "84", "Bundesland": "1402", "Landkreis": "Karlsruhe", "Gemeinde": "Karlsbad", "Gemeindeschluessel": "08215096", "Postleitzahl": "76307", "Strasse": "Im Buckeberg", "StrasseNichtGefunden": "0", "Hausnummer": "62", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Karlsbad", "Laengengrad": "8.524357", "Breitengrad": "48.914035", "Registrierungsdatum": "2021-10-04", "GeplantesInbetriebnahmedatum": "2021-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Im Buckeberg 62 Stromspeicher", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "Einspeisungsart": "689", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE970118338879", "EegAnlagentyp": "8", "Technologie": "524", "mwh": 13, "pr_url_id": "4680516", "ext_id": "SEE946919525862", "mw": 13, "status": "planning"}, "first_month": "2021-11", "changes": [], "current": {"EinheitMastrNummer": "SEE946919525862", "DatumLetzteAktualisierung": "2021-10-04T16:36:44.0149153", "NetzbetreiberpruefungStatus": "0", "AnlagenbetreiberMastrNummer": "ABR937155736822", "Land": "84", "Bundesland": "1402", "Landkreis": "Karlsruhe", "Gemeinde": "Karlsbad", "Gemeindeschluessel": "08215096", "Postleitzahl": "76307", "Strasse": "Im Buckeberg", "StrasseNichtGefunden": "0", "Hausnummer": "62", "Hausnummer_nv": "0", "HausnummerNichtGefunden": "0", "Ort": "Karlsbad", "Laengengrad": "8.524357", "Breitengrad": "48.914035", "Registrierungsdatum": "2021-10-04", "GeplantesInbetriebnahmedatum": "2021-12-01", "EinheitSystemstatus": "472", "EinheitBetriebsstatus": "31", "NichtVorhandenInMigriertenEinheiten": "0", "NameStromerzeugungseinheit": "Im Buckeberg 62 Stromspeicher", "Weic_nv": "0", "Kraftwerksnummer_nv": "0", "Energietraeger": "2496", "Bruttoleistung": "13800.000", "Nettonennleistung": "13800.000", "AnschlussAnHoechstOderHochSpannung": "0", "FernsteuerbarkeitNb": "0", "FernsteuerbarkeitDv": "0", "Einspeisungsart": "689", "AcDcKoppelung": "693", "Batterietechnologie": "727", "Notstromaggregat": "0", "ZugeordnenteWirkleistungWechselrichter": "15000.000", "SpeMastrNummer": "SSE970118338879", "EegAnlagentyp": "8", "Technologie": "524", "pr_url_id": "4680516", "owner": "", "mwh": 13, "ext_id": "SEE946919525862", "mw": 13, "status": "planning"}, "current_month": "2022-05", "dates": {"first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01"}}, "mw": 13, "mwh_is_estimate": false, "mwh": 13, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01", "month_disappeared": "", "go_live": "0 ~ 2021-12", "go_live_year_int": 2021, "name": "Im Buckeberg 62 Stromspeicher", "name_short": "Im Buckeberg 62 Stromspeicher", "owner": "", "state": "baden-wuerttemberg", "country": "germany", "lat": "48.914035", "long": "8.524357", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca", "emojis_with_tooltips": "\ud83d\udcca", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:48.914035+8.524357", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/4680516"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Nofar Israel", "city": "", "id": "5", "external_id": "", "state": "", "country": "israel", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "Nofar Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.961747", "long": "34.835081", "coords_hint": "0", "use_case": "150mw solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy", "link2": "", "link3": "", "link4": ""}, "internal_id": "5", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Nofar Israel", "name_short": "Nofar Israel", "owner": "", "state": "", "country": "israel", "lat": "31.961747", "long": "34.835081", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.961747+34.835081", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hokkaido", "city": "", "id": "10", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.325369", "long": "142.589328", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market", "link2": "", "link3": "", "link4": ""}, "internal_id": "10", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 6, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hokkaido", "name_short": "Hokkaido", "owner": "", "state": "", "country": "japan", "lat": "43.325369", "long": "142.589328", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:43.325369+142.589328", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "switch datacenter", "city": "", "id": "18", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "", "customer": "switch", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.058908", "long": "-115.21174", "coords_hint": "0", "use_case": "datacenter", "notes": "", "project_website": "", "link1": "https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/", "link2": "", "link3": "", "link4": ""}, "internal_id": "18", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "switch datacenter", "name_short": "switch datacenter", "owner": "", "state": "nevada", "country": "usa", "lat": "36.058908", "long": "-115.21174", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.058908+-115.21174", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ozop New York", "city": "new york city / brooklyn", "id": "33", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "2", "customer": "Ozop Energy Systems", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.645624", "long": "-73.940749", "coords_hint": "0", "use_case": "peak shaving", "notes": "together with stem athena software", "project_website": "", "link1": "https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "link2": "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html", "link3": "", "link4": ""}, "internal_id": "33", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 2, "mwh_is_estimate": false, "mwh": 4, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ozop New York", "name_short": "Ozop New York", "owner": "", "state": "new york", "country": "usa", "lat": "40.645624", "long": "-73.940749", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.645624+-73.940749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["together with stem athena software"], "links": ["https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Morro Bay", "city": "Morro Bay", "id": "41", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "2400", "estimate_mwh": "", "power_mw": "600", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.374224", "long": "-120.858684", "coords_hint": "1", "use_case": "", "notes": "revitalise existing gas power plant site, start construction in 2022 should take 36-48 month to complete", "project_website": "", "link1": "https://www.energy-storage.news/vistra-proposes-california-battery-project-twice-the-size-of-worlds-largest-facility-to-date/", "link2": "http://www.morrobayca.gov/documentcenter/view/15093", "link3": "", "link4": ""}, "internal_id": "41", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 600, "mwh_is_estimate": false, "mwh": 2400, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Morro Bay", "name_short": "Morro Bay", "owner": "", "state": "california", "country": "usa", "lat": "35.374224", "long": "-120.858684", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.374224+-120.858684", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["revitalise existing gas power plant site, start construction in 2022 should take 36-48 month to complete"], "links": ["https://www.energy-storage.news/vistra-proposes-california-battery-project-twice-the-size-of-worlds-largest-facility-to-date/", "http://www.morrobayca.gov/documentcenter/view/15093"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hubei Flow Battery", "city": "Xiangyang", "id": "44", "external_id": "", "state": "hubei", "country": "china", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "100", "customer": "Hubei Pingfan Ruifeng New Energy Technology", "owner": "", "developer": "", "manufacturer": "VRB Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-05-21", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.075783", "long": "112.145275", "coords_hint": "0", "use_case": "500MW rooftop solar support", "notes": "Vanadium flow battery, built in phases", "project_website": "", "link1": "https://www.energy-storage.news/vrb-energy-breaks-ground-on-100mw-500mwh-flow-battery-and-gigafactory-in-china/", "link2": "https://vrbenergy.com/vrb-energy-announces-agreement-for-chinas-largest-solar-battery-a-100mw-solar-storage-project-in-hubei-province/", "link3": "", "link4": ""}, "internal_id": "44", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 500, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2021-05-21", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hubei Flow Battery", "name_short": "Hubei Flow Battery", "owner": "", "state": "hubei", "country": "china", "lat": "32.075783", "long": "112.145275", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.075783+112.145275", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Vanadium flow battery, built in phases"], "links": ["https://www.energy-storage.news/vrb-energy-breaks-ground-on-100mw-500mwh-flow-battery-and-gigafactory-in-china/", "https://vrbenergy.com/vrb-energy-announces-agreement-for-chinas-largest-solar-battery-a-100mw-solar-storage-project-in-hubei-province/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Spalding", "city": "spalding", "id": "58", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "170", "customer": "Intergen", "owner": "", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.805112", "long": "-0.133741", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.intergen.com/our-technologies/development-projects/spalding-energy-park/", "link1": "https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec", "link2": "", "link3": "", "link4": ""}, "internal_id": "58", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 170, "mwh_is_estimate": false, "mwh": 350, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Spalding", "name_short": "Spalding", "owner": "", "state": "", "country": "uk", "lat": "52.805112", "long": "-0.133741", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.805112+-0.133741", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Antofagasta", "city": "Atacama Desert", "id": "59", "external_id": "", "state": "", "country": "chile", "capacity_mwh": "560", "estimate_mwh": "", "power_mw": "112", "customer": "AES Gener", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Sunstack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-19", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-24.014801", "long": "-68.58494", "coords_hint": "0", "use_case": "253MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/aes-begins-work-on-560mwh-largest-battery-system-in-latin-america-for-solar-and-wind-in-chile/", "link2": "https://www.renpp.eu/en/solar-project/andes-solar-park-1018", "link3": "", "link4": ""}, "internal_id": "59", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 112, "mwh_is_estimate": false, "mwh": 560, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2020-10-19", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Antofagasta", "name_short": "Antofagasta", "owner": "", "state": "", "country": "chile", "lat": "-24.014801", "long": "-68.58494", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-24.014801+-68.58494", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/aes-begins-work-on-560mwh-largest-battery-system-in-latin-america-for-solar-and-wind-in-chile/", "https://www.renpp.eu/en/solar-project/andes-solar-park-1018"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crimson", "city": "Riverside County", "id": "72", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "1400", "estimate_mwh": "", "power_mw": "350", "customer": "Recurrent Energy / Axium Infrastructure", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.705099", "long": "-115.804279", "coords_hint": "0", "use_case": "", "notes": "construction is expected to start in q3 2021, location is 35miles northwest of substation near blythe / colorado river substation", "project_website": "https://recurrentenergy.com/project-portfolio/#", "link1": "https://www.energy-storage.news/canadian-solar-sells-majority-stake-in-1-4gwh-california-battery-energy-storage-project/", "link2": "https://www.energy-storage.news/us-doi-gives-green-light-to-350mw-1400mwh-energy-storage-project-in-california/", "link3": "", "link4": ""}, "internal_id": "72", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 350, "mwh_is_estimate": false, "mwh": 1400, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Crimson", "name_short": "Crimson", "owner": "", "state": "california", "country": "usa", "lat": "33.705099", "long": "-115.804279", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.705099+-115.804279", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["construction is expected to start in q3 2021, location is 35miles northwest of substation near blythe / colorado river substation"], "links": ["https://www.energy-storage.news/canadian-solar-sells-majority-stake-in-1-4gwh-california-battery-energy-storage-project/", "https://www.energy-storage.news/us-doi-gives-green-light-to-350mw-1400mwh-energy-storage-project-in-california/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Slate", "city": "Kings County", "id": "73", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "561", "estimate_mwh": "", "power_mw": "140", "customer": "Recurrent Energy / Goldman Sachs Renewables Power (GSRP)", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.227583", "long": "-119.877056", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/slate/", "link1": "https://www.energy-storage.news/progress-report-some-more-of-us-biggest-battery-projects-taking-shape/", "link2": "https://ceqanet.opr.ca.gov/2019069068/2", "link3": "", "link4": ""}, "internal_id": "73", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 140, "mwh_is_estimate": false, "mwh": 561, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2021-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Slate", "name_short": "Slate", "owner": "", "state": "california", "country": "usa", "lat": "36.227583", "long": "-119.877056", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.227583+-119.877056", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/progress-report-some-more-of-us-biggest-battery-projects-taking-shape/", "https://ceqanet.opr.ca.gov/2019069068/2"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coventry Energy Superhub", "city": "Coventry", "id": "81", "external_id": "", "state": "west midlands", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "100", "customer": "Pivot Power (EDF Renewables)", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.404409", "long": "-1.525063", "coords_hint": "0", "use_case": "EV charging support", "notes": "", "project_website": "https://www.pivot-power.co.uk/our-projects/#", "link1": "https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/", "link2": "", "link3": "", "link4": ""}, "internal_id": "81", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coventry Energy Superhub", "name_short": "Coventry Energy Superhub", "owner": "", "state": "west midlands", "country": "uk", "lat": "52.404409", "long": "-1.525063", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.404409+-1.525063", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bustleholmel Energy Superhub", "city": "Sandwell", "id": "82", "external_id": "", "state": "west midlands", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "100", "customer": "Pivot Power (EDF Renewables)", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.543952", "long": "-1.981982", "coords_hint": "0", "use_case": "EV charging support", "notes": "", "project_website": "https://www.pivot-power.co.uk/our-projects/#", "link1": "https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/", "link2": "", "link3": "", "link4": ""}, "internal_id": "82", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bustleholmel Energy Superhub", "name_short": "Bustleholmel Energy Superhub", "owner": "", "state": "west midlands", "country": "uk", "lat": "52.543952", "long": "-1.981982", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.543952+-1.981982", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wunsiedel", "city": "Wunsiedel", "id": "85", "external_id": "", "state": "bavaria", "country": "germany", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Siemens", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.041482", "long": "12.029522", "coords_hint": "0", "use_case": "hydrogen plant support", "notes": "2021: just a letter of intent", "project_website": "", "link1": "https://www.energy-storage.news/siemens-and-fluence-to-build-renewables-integrating-100mw-200mwh-battery-project-in-germany/", "link2": "", "link3": "", "link4": ""}, "internal_id": "85", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wunsiedel", "name_short": "Wunsiedel", "owner": "Siemens", "state": "bavaria", "country": "germany", "lat": "50.041482", "long": "12.029522", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.041482+12.029522", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2021: just a letter of intent"], "links": ["https://www.energy-storage.news/siemens-and-fluence-to-build-renewables-integrating-100mw-200mwh-battery-project-in-germany/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kemsley Energy Superhub", "city": "Kemsley", "id": "92", "external_id": "7368", "state": "kent", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Pivot Power (EDF Renewables)", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "construction start date from youtube video", "project_website": "https://www.pivot-power.co.uk/our-projects/", "link1": "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "link2": "https://www.youtube.com/watch?v=od2h3syN8P4&t=2s", "link3": "", "link4": ""}, "internal_id": "92", "external_id": "7368", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kemsley Substation", "external_id": "7368", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "construction", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.366785", "long": "0.742542", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7368", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Kemsley Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land To The South Of Kemsley S, Ypres Drive, Kemsley, Sittingbourne, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME10 2", "X-coordinate": "591008", "Y-coordinate": "166650", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "19/502514/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/07/2022", "Under Construction": "15/11/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.366785", "long": "0.742542", "status": "construction", "mw": 49, "ext_id": "7368"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "15/11/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7368", "Record Last Updated (dd/mm/yyyy)": "15/11/2019", "Operator (or Applicant)": "Pivot Power", "Site Name": "Kemsley Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South Of Kemsley S, Ypres Drive, Kemsley, Sittingbourne, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME10 2", "X-coordinate": "591008", "Y-coordinate": "166650", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "19/502514/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/07/2022", "Under Construction": "15/11/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.366785", "long": "0.742542", "status": "construction", "mw": 49, "ext_id": "7368"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kemsley Substation", "name_short": "Kemsley Substation", "owner": "Pivot Power", "state": "south east", "country": "uk", "lat": "51.366785", "long": "0.742542", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.366785+0.742542", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["construction start date from youtube video"], "links": ["https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "https://www.youtube.com/watch?v=od2h3syN8P4&t=2s"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ringo-Bellac", "city": "Bellac", "id": "95", "external_id": "", "state": "haute-vienne", "country": "france", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "10", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Saft", "type": "", "cells": "Tianneng", "no_of_battery_units": "12", "status": "construction", "date_first_heard": "", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.104588", "long": "1.04347", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "2021: experiment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-renouvelable-lexperimentation-ringo-bellac-haute-vienne", "link3": "", "link4": ""}, "internal_id": "95", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ringo-Bellac", "name_short": "Ringo-Bellac", "owner": "", "state": "haute-vienne", "country": "france", "lat": "46.104588", "long": "1.04347", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.104588+1.04347", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 12, "notes_split": ["2021: experiment which lasts for 3 years"], "links": ["https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-renouvelable-lexperimentation-ringo-bellac-haute-vienne"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ringo-Ventavon", "city": "Ventavon", "id": "96", "external_id": "", "state": "", "country": "france", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "10", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Blue Solutions", "type": "Blue LMP", "cells": "Bollore LMP", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "44.344414", "long": "5.915866", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "2021: experiment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-lexperimentation-ringo-ventavon", "link3": "https://www.engie-solutions.com/en/news/renewable-energy-storage", "link4": ""}, "internal_id": "96", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2020-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ringo-Ventavon", "name_short": "Ringo-Ventavon", "owner": "", "state": "", "country": "france", "lat": "44.344414", "long": "5.915866", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:44.344414+5.915866", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2021: experiment which lasts for 3 years"], "links": ["https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-lexperimentation-ringo-ventavon", "https://www.engie-solutions.com/en/news/renewable-energy-storage"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Intrepid", "city": "Oceanside", "id": "127", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "300", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.616803", "long": "-73.646401", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, "internal_id": "127", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 300, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Intrepid", "name_short": "Intrepid", "owner": "Hecate Energy", "state": "new york", "country": "usa", "lat": "40.616803", "long": "-73.646401", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.616803+-73.646401", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Loy Yang", "city": "", "id": "135", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "AGL Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.254578", "long": "146.581076", "coords_hint": "0", "use_case": "at coal power plant", "notes": "", "project_website": "", "link1": "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-loy-yang-s-proposed-battery-receives-planning-approval", "link2": "", "link3": "", "link4": ""}, "internal_id": "135", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Loy Yang", "name_short": "Loy Yang", "owner": "AGL Energy Limited", "state": "victoria", "country": "australia", "lat": "-38.254578", "long": "146.581076", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-38.254578+146.581076", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-loy-yang-s-proposed-battery-receives-planning-approval"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Liddell", "city": "", "id": "136", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "AGL Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-32.371786", "long": "150.972683", "coords_hint": "0", "use_case": "at coal power plant", "notes": "could not find mwh info", "project_website": "", "link1": "https://www.pv-magazine-australia.com/2021/05/07/agl-pushes-ahead-with-renewable-energy-plans-for-liddell-site/", "link2": "", "link3": "", "link4": ""}, "internal_id": "136", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-05-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Liddell", "name_short": "Liddell", "owner": "AGL Energy Limited", "state": "new south wales", "country": "australia", "lat": "-32.371786", "long": "150.972683", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-32.371786+150.972683", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["could not find mwh info"], "links": ["https://www.pv-magazine-australia.com/2021/05/07/agl-pushes-ahead-with-renewable-energy-plans-for-liddell-site/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Omburu", "city": "erongo region", "id": "256", "external_id": "", "state": "", "country": "namibia", "capacity_mwh": "72", "estimate_mwh": "", "power_mw": "58", "customer": "", "owner": "NamPower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-21.495675", "long": "16.026467", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/e20m-grant-funding-for-namibias-first-grid-scale-bess-from-germanys-national-development-bank/", "link2": "", "link3": "", "link4": ""}, "internal_id": "256", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 58, "mwh_is_estimate": false, "mwh": 72, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Omburu", "name_short": "Omburu", "owner": "NamPower", "state": "", "country": "namibia", "lat": "-21.495675", "long": "16.026467", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-21.495675+16.026467", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/e20m-grant-funding-for-namibias-first-grid-scale-bess-from-germanys-national-development-bank/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chelveston Renewable Energy Park", "city": "", "id": "273", "external_id": "6941", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Federal Estates", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-06-15", "start_construction": "2019-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "273", "external_id": "6941", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chelveston Renewable Energy Park", "external_id": "6941", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Federal Estates", "status": "construction", "date_first_heard": "2017-06-15", "start_construction": "2019-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.310725", "long": "-0.530869", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6941", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Federal Estates", "Site Name": "Chelveston Renewable Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,\ufffdNorthamptonshire", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN9 6AR", "X-coordinate": "500254", "Y-coordinate": "269084", "Planning Authority": "East Northamptonshire Council", "Planning Application Reference": "17/00784/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2019", "Operational": "", "Heat Network Ref": "", "lat": "52.310725", "long": "-0.530869", "status": "construction", "mw": 20, "ext_id": "6941"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,\ufffdNorthamptonshire", "to": "Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,\ufffd", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/05/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6941", "Record Last Updated (dd/mm/yyyy)": "27/05/2020", "Operator (or Applicant)": "Federal Estates", "Site Name": "Chelveston Renewable Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,\ufffd", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN9 6AR", "X-coordinate": "500254", "Y-coordinate": "269084", "Planning Authority": "East Northamptonshire Council", "Planning Application Reference": "17/00784/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2019", "Operational": "", "Heat Network Ref": "", "lat": "52.310725", "long": "-0.530869", "status": "construction", "mw": 20, "ext_id": "6941"}, "current_month": "2024-01", "dates": {"first_heard": "2020-05-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-06-15", "start_construction": "2019-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chelveston Renewable Energy Park", "name_short": "Chelveston Renewable Energy Park", "owner": "Federal Estates", "state": "east midlands", "country": "uk", "lat": "52.310725", "long": "-0.530869", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.310725+-0.530869", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Breach Farm - Energy Barn", "city": "", "id": "275", "external_id": "6914", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "275", "external_id": "6914", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Breach Farm - Energy Barn", "external_id": "6914", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Bluefield Solar Income Fund", "status": "planning", "date_first_heard": "2017-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.766651", "long": "-1.609775", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6914", "Record Last Updated (dd/mm/yyyy)": "25/08/2020", "Operator (or Applicant)": "Anesco/ Green Hedge Energy UK", "Site Name": "Breach Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Breach Farm, Caldwell, Swadlincote, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE12 6RJ", "X-coordinate": "426427", "Y-coordinate": "318855", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "9/2017/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/08/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.766651", "long": "-1.609775", "status": "planning", "mw": 40, "ext_id": "6914"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/08/2020", "to": "27/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Anesco/ Green Hedge Energy UK", "to": "Bluefield Solar Income Fund", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Breach Farm, Caldwell, Swadlincote, Derbyshire", "to": "Breach Farm, Caldwell, Swadlincote, ", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/08/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Planning Permission Expired", "from": "15/08/2020", "to": "01/05/2021", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6914", "Record Last Updated (dd/mm/yyyy)": "27/05/2022", "Operator (or Applicant)": "Bluefield Solar Income Fund", "Site Name": "Breach Farm - Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6962", "Address": "Breach Farm, Caldwell, Swadlincote, ", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE12 6RJ", "X-coordinate": "426427", "Y-coordinate": "318855", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "9/2017/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/08/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/05/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.766651", "long": "-1.609775", "status": "planning", "mw": 40, "ext_id": "6914"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2017-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Breach Farm - Energy Barn", "name_short": "Breach Farm - Energy Barn", "owner": "Bluefield Solar Income Fund", "state": "east midlands", "country": "uk", "lat": "52.766651", "long": "-1.609775", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.766651+-1.609775", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Traston Road", "city": "", "id": "277", "external_id": "6929", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "277", "external_id": "6929", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Traston Road", "external_id": "6929", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Field Energy", "status": "planning", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.568102", "long": "-2.966702", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6929", "Record Last Updated (dd/mm/yyyy)": "28/04/2020", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Traston Road", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land East Of Clarke Energy Production, Traston Road, Newport", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP19 4PW", "X-coordinate": "333094", "Y-coordinate": "185913", "Planning Authority": "Newport City Council", "Planning Application Reference": "16/0855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/11/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.568102", "long": "-2.966702", "status": "planning", "mw": 20, "ext_id": "6929"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/04/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "08/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "UK Power Reserve", "to": "Field Energy", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "03/11/2021", "to": "27/07/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6929", "Record Last Updated (dd/mm/yyyy)": "08/09/2023", "Operator (or Applicant)": "Field Energy", "Site Name": "Traston Road", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land East Of Clarke Energy Production, Traston Road, Newport", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP19 4PW", "X-coordinate": "333094", "Y-coordinate": "185913", "Planning Authority": "Newport City Council", "Planning Application Reference": "16/0855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/08/2016", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/07/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.568102", "long": "-2.966702", "status": "planning", "mw": 20, "ext_id": "6929"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Traston Road", "name_short": "Traston Road", "owner": "Field Energy", "state": "wales", "country": "uk", "lat": "51.568102", "long": "-2.966702", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.568102+-2.966702", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Slamseys Energy Storage", "city": "", "id": "288", "external_id": "7000", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Gridserve Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-10-26", "start_construction": "2020-01-13", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "288", "external_id": "7000", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Slamseys Energy Storage", "external_id": "7000", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Gridserve Energy Storage", "status": "construction", "date_first_heard": "2017-10-26", "start_construction": "2020-01-13", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.850774", "long": "0.523461", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7000", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Gridserve Energy Storage", "Site Name": "Slamseys Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land North Of Slamseys Farm, Blackley Lane, Great Notley, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM77 7QW", "X-coordinate": "573901", "Y-coordinate": "219919", "Planning Authority": "Braintree District Council", "Planning Application Reference": "17/01235/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "13/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "51.850774", "long": "0.523461", "status": "construction", "mw": 10, "ext_id": "7000"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/01/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7000", "Record Last Updated (dd/mm/yyyy)": "20/01/2020", "Operator (or Applicant)": "Gridserve Energy Storage", "Site Name": "Slamseys Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North Of Slamseys Farm, Blackley Lane, Great Notley, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM77 7QW", "X-coordinate": "573901", "Y-coordinate": "219919", "Planning Authority": "Braintree District Council", "Planning Application Reference": "17/01235/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "13/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "51.850774", "long": "0.523461", "status": "construction", "mw": 10, "ext_id": "7000"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-10-26", "start_construction": "2020-01-13", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Slamseys Energy Storage", "name_short": "Slamseys", "owner": "Gridserve Energy Storage", "state": "eastern", "country": "uk", "lat": "51.850774", "long": "0.523461", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.850774+0.523461", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Norwich Road Industrial Estate", "city": "", "id": "290", "external_id": "6958", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "290", "external_id": "6958", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Norwich Road Industrial Estate", "external_id": "6958", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "RNA Energy", "status": "planning", "date_first_heard": "2017-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.356262", "long": "1.508561", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6958", "Record Last Updated (dd/mm/yyyy)": "07/04/2021", "Operator (or Applicant)": "RNA Energy", "Site Name": "Norwich Road Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth Suffolk", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 8QJ", "X-coordinate": "639014", "Y-coordinate": "278928", "Planning Authority": "Suffolk Coastal District Council", "Planning Application Reference": "DC/17/0161/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/01/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.356262", "long": "1.508561", "status": "planning", "mw": 40, "ext_id": "6958"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth Suffolk", "to": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth ", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/04/2021", "to": "04/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12529", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "04/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6958", "Record Last Updated (dd/mm/yyyy)": "04/11/2022", "Operator (or Applicant)": "RNA Energy", "Site Name": "Norwich Road Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12529", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 8QJ", "X-coordinate": "639014", "Y-coordinate": "278928", "Planning Authority": "Suffolk Coastal District Council", "Planning Application Reference": "DC/17/0161/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/01/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.356262", "long": "1.508561", "status": "planning", "mw": 40, "ext_id": "6958"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2017-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Norwich Road Industrial Estate", "name_short": "Norwich Road Industrial Estate", "owner": "RNA Energy", "state": "eastern", "country": "uk", "lat": "52.356262", "long": "1.508561", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.356262+1.508561", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land off Queenborough Road", "city": "", "id": "291", "external_id": "7003", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-10-30", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "291", "external_id": "7003", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land off Queenborough Road", "external_id": "7003", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "UK Power Reserve", "status": "construction", "date_first_heard": "2018-10-30", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.408738", "long": "0.767948", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7003", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Land off Queenborough Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Adjacent To 9 Neatscourt Cottages, Queenborough Road, Halfway, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME12 3RJ", "X-coordinate": "592600", "Y-coordinate": "171381", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "17/503032/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/06/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/10/2021", "Under Construction": "01/12/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.408738", "long": "0.767948", "status": "construction", "mw": 40, "ext_id": "7003"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/01/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7003", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "UK Power Reserve", "Site Name": "Land off Queenborough Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent To 9 Neatscourt Cottages, Queenborough Road, Halfway, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME12 3RJ", "X-coordinate": "592600", "Y-coordinate": "171381", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "17/503032/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/06/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/10/2021", "Under Construction": "01/12/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.408738", "long": "0.767948", "status": "construction", "mw": 40, "ext_id": "7003"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-10-30", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Land off Queenborough Road", "name_short": "Land off Queenborough Road", "owner": "UK Power Reserve", "state": "south east", "country": "uk", "lat": "51.408738", "long": "0.767948", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.408738+0.767948", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bilbo Solar Farm Energy Storage ", "city": "", "id": "296", "external_id": "7020", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Energy International", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-09-20", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "296", "external_id": "7020", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bilbo Solar Farm Energy Storage ", "external_id": "7020", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Green Energy International", "status": "construction", "date_first_heard": "2019-09-20", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.589434", "long": "-1.912557", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7020", "Record Last Updated (dd/mm/yyyy)": "30/07/2020", "Operator (or Applicant)": "Green Energy International", "Site Name": "Bilbo Solar Farm Energy Storage ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6736", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian", "County": "Aberdeen", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QJ", "X-coordinate": "405327", "Y-coordinate": "855492", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2019/0296", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/12/2020", "Operational": "", "Heat Network Ref": "", "lat": "57.589434", "long": "-1.912557", "status": "construction", "mw": 40, "ext_id": "7020"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/07/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Aberdeen", "to": "Aberdeenshire", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "30/07/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7020", "Record Last Updated (dd/mm/yyyy)": "30/07/2020", "Operator (or Applicant)": "Green Energy International", "Site Name": "Bilbo Solar Farm Energy Storage ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6736", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QJ", "X-coordinate": "405327", "Y-coordinate": "855492", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2019/0296", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/12/2020", "Operational": "", "Heat Network Ref": "", "lat": "57.589434", "long": "-1.912557", "status": "construction", "mw": 40, "ext_id": "7020"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-09-20", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bilbo Solar Farm Energy Storage ", "name_short": "Bilbo Solar Farm Energy Storage ", "owner": "Green Energy International", "state": "scotland", "country": "uk", "lat": "57.589434", "long": "-1.912557", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.589434+-1.912557", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stony Energy Storage Facility", "city": "", "id": "297", "external_id": "7001", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "297", "external_id": "7001", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stony Energy Storage Facility", "external_id": "7001", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 79, "power_mw": 79, "owner": "Gore Street Energy Storage Fund", "status": "construction", "date_first_heard": "2017-10-12", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.018193", "long": "-0.868566", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7001", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Stony Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land to the south west of Stony Stratford Substation, south of Stratford Road, Milton Keynes", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "MK19 6DZ", "X-coordinate": "477740", "Y-coordinate": "236134", "Planning Authority": "Aylesbury Vale District Council", "Planning Application Reference": "17/02259/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.018193", "long": "-0.868566", "status": "planning", "mw": 49, "ext_id": "7001"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2020", "to": "18/03/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Renewable Energy Systems (RES)", "to": "Gore Street Energy Storage Fund", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "49.90", "to": "79.90", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 49, "to": 79, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "12/10/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/03/2022", "to": "30/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "30/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7001", "Record Last Updated (dd/mm/yyyy)": "30/11/2022", "Operator (or Applicant)": "Gore Street Energy Storage Fund", "Site Name": "Stony Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "79.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south west of Stony Stratford Substation, south of Stratford Road, Milton Keynes", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "MK19 6DZ", "X-coordinate": "477740", "Y-coordinate": "236134", "Planning Authority": "Aylesbury Vale District Council", "Planning Application Reference": "17/02259/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/10/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/10/2020", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "52.018193", "long": "-0.868566", "status": "construction", "mw": 79, "ext_id": "7001"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-25", "start_construction": "2022-11-30", "start_operation": ""}, "month_disappeared": ""}, "mw": 79, "mwh_is_estimate": true, "mwh": 79, "mwh_estimate": 79, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-10-12", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stony Energy Storage Facility", "name_short": "Stony Energy", "owner": "Gore Street Energy Storage Fund", "state": "south east", "country": "uk", "lat": "52.018193", "long": "-0.868566", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.018193+-0.868566", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ravensroost Farm", "city": "", "id": "302", "external_id": "7014", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Arlington Energy (formerly Enso Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-10-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "302", "external_id": "7014", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ravensroost Farm, Minety - Battery Energy Storage", "external_id": "7014", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Conrad Energy Developments II Limited", "status": "planning", "date_first_heard": "2020-02-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.594997", "long": "-1.957914", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7014", "Record Last Updated (dd/mm/yyyy)": "12/02/2020", "Operator (or Applicant)": "Arlington Energy (formerly Enso Energy)", "Site Name": "Ravensroost Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land Adjacent Ravensroost Farm, Minety, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RJ", "X-coordinate": "403012", "Y-coordinate": "188462", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "18/04914/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.594997", "long": "-1.957914", "status": "planning", "mw": 49, "ext_id": "7014"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/02/2020", "to": "29/06/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Arlington Energy (formerly Enso Energy)", "to": "Conrad Energy Developments II Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Ravensroost Farm", "to": "Ravensroost Farm, Minety - Battery Energy Storage", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Planning Application Submitted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Application Submitted", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Adjacent Ravensroost Farm, Minety, Malmesbury, Wiltshire", "to": "Ravensroost Farm, Minety, Malmesbury, ", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "18/04914/FUL", "to": "PL/2022/04524", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "15/06/2018", "to": "13/06/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "10/10/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/06/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "29/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7014", "Record Last Updated (dd/mm/yyyy)": "29/06/2022", "Operator (or Applicant)": "Conrad Energy Developments II Limited", "Site Name": "Ravensroost Farm, Minety - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ravensroost Farm, Minety, Malmesbury, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RJ", "X-coordinate": "403012", "Y-coordinate": "188462", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/04524", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.594997", "long": "-1.957914", "status": "planning", "mw": 49, "ext_id": "7014"}, "current_month": "2024-01", "dates": {"first_heard": "2020-02-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-02-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ravensroost Farm, Minety - Battery Energy Storage", "name_short": "Ravensroost Farm, Minety", "owner": "Conrad Energy Developments II Limited", "state": "south west", "country": "uk", "lat": "51.594997", "long": "-1.957914", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.594997+-1.957914", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drax Re-Power", "city": "", "id": "303", "external_id": "7017", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Drax Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "303", "external_id": "7017", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drax Re-Power", "external_id": "7017", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Drax Group", "status": "planning", "date_first_heard": "2019-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.732262", "long": "-0.995254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7017", "Record Last Updated (dd/mm/yyyy)": "02/01/2020", "Operator (or Applicant)": "Drax Group", "Site Name": "Drax Re-Power", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "New Road, Drax, Selby, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PH", "X-coordinate": "466381", "Y-coordinate": "426676", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.732262", "long": "-0.995254", "status": "planning", "mw": 200, "ext_id": "7017"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/01/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "02/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7017", "Record Last Updated (dd/mm/yyyy)": "02/01/2020", "Operator (or Applicant)": "Drax Group", "Site Name": "Drax Re-Power", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "New Road, Drax, Selby, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PH", "X-coordinate": "466381", "Y-coordinate": "426676", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.732262", "long": "-0.995254", "status": "planning", "mw": 200, "ext_id": "7017"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2019-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drax Re-Power", "name_short": "Drax Re", "owner": "Drax Group", "state": "yorkshire and humber", "country": "uk", "lat": "53.732262", "long": "-0.995254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.732262+-0.995254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "STOR Field 9", "city": "", "id": "304", "external_id": "7018", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "37", "power_mw": "37", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "304", "external_id": "7018", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "STOR Field 9", "external_id": "7018", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 37, "power_mw": 37, "owner": "Capbal", "status": "planning", "date_first_heard": "2018-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.038888", "long": "-3.394798", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7018", "Record Last Updated (dd/mm/yyyy)": "24/07/2020", "Operator (or Applicant)": "Capbal", "Site Name": "STOR Field 9", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "37.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land East of North Road, Inverkeithing, Dunfermline, Fife", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY11 1HT", "X-coordinate": "313196", "Y-coordinate": "683767", "Planning Authority": "Fife Council", "Planning Application Reference": "18/01583/PPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/12/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/12/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.038888", "long": "-3.394798", "status": "planning", "mw": 37, "ext_id": "7018"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/07/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "06/12/2021", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/04/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7018", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Capbal", "Site Name": "STOR Field 9", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "37", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land East of North Road, Inverkeithing, Dunfermline, Fife", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY11 1HT", "X-coordinate": "313196", "Y-coordinate": "683767", "Planning Authority": "Fife Council", "Planning Application Reference": "18/01583/PPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/12/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.038888", "long": "-3.394798", "status": "planning", "mw": 37, "ext_id": "7018"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 37, "mwh_is_estimate": true, "mwh": 37, "mwh_estimate": 37, "status": "planning", "status_class": "", "date_first_heard": "2018-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "STOR Field 9", "name_short": "STOR Field 9", "owner": "Capbal", "state": "scotland", "country": "uk", "lat": "56.038888", "long": "-3.394798", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.038888+-3.394798", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Norwich Substation Storage Facility", "city": "", "id": "306", "external_id": "7021", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "306", "external_id": "7021", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Norwich Substation Storage Facility", "external_id": "7021", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2018-11-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.57348", "long": "1.275689", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7021", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Norwich Substation Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Norwich Main Substation, Mangreen Hall Lane, Dunston, Norwich, Norfolk", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8PG", "X-coordinate": "622065", "Y-coordinate": "302336", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2018/2017", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/11/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/11/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.57348", "long": "1.275689", "status": "planning", "mw": 49, "ext_id": "7021"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7021", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Norwich Substation Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Norwich Main Substation, Mangreen Hall Lane, Dunston, Norwich, Norfolk", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8PG", "X-coordinate": "622065", "Y-coordinate": "302336", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2018/2017", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/11/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/11/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.57348", "long": "1.275689", "status": "planning", "mw": 49, "ext_id": "7021"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2018-11-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Norwich Substation Storage Facility", "name_short": "Norwich Substation", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "52.57348", "long": "1.275689", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.57348+1.275689", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Enderby Storage, Redcomb Farm", "city": "", "id": "309", "external_id": "7044", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy / Enderby Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-20", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "309", "external_id": "7044", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Enderby Storage, Redcomb Farm", "external_id": "7044", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy / Enderby Storage", "status": "construction", "date_first_heard": "2017-12-20", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.597459", "long": "-1.223231", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7044", "Record Last Updated (dd/mm/yyyy)": "21/08/2020", "Operator (or Applicant)": "Statera Energy / Enderby Storage", "Site Name": "Enderby Storage, Redcomb Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Opposite Redcomb Farm, Desford Road, Lubbesthorpe, Leicester, Leicestershire", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE19 4AD", "X-coordinate": "452711", "Y-coordinate": "300246", "Planning Authority": "Blaby District Council", "Planning Application Reference": "17/1223/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2021", "Operational": "", "Heat Network Ref": "", "lat": "52.597459", "long": "-1.223231", "status": "construction", "mw": 49, "ext_id": "7044"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/08/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/04/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7044", "Record Last Updated (dd/mm/yyyy)": "01/04/2021", "Operator (or Applicant)": "Statera Energy / Enderby Storage", "Site Name": "Enderby Storage, Redcomb Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Opposite Redcomb Farm, Desford Road, Lubbesthorpe, Leicester, Leicestershire", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE19 4AD", "X-coordinate": "452711", "Y-coordinate": "300246", "Planning Authority": "Blaby District Council", "Planning Application Reference": "17/1223/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/04/2021", "Operational": "", "Heat Network Ref": "", "lat": "52.597459", "long": "-1.223231", "status": "construction", "mw": 49, "ext_id": "7044"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-12-20", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Enderby Storage, Redcomb Farm", "name_short": "Enderby Storage, Redcomb Farm", "owner": "Statera Energy / Enderby Storage", "state": "east midlands", "country": "uk", "lat": "52.597459", "long": "-1.223231", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.597459+-1.223231", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middleton Clean Energy Plant", "city": "", "id": "310", "external_id": "7029", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Lancaster Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "310", "external_id": "7029", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Middleton Clean Energy Plant", "external_id": "7029", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Infra Balance New Energy", "status": "planning", "date_first_heard": "2020-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.040905", "long": "-2.895509", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7029", "Record Last Updated (dd/mm/yyyy)": "04/06/2020", "Operator (or Applicant)": "Lancaster Power", "Site Name": "Middleton Clean Energy Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe, Lancashire, LA3 2", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA32", "X-coordinate": "341454", "Y-coordinate": "460919", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "18/01203/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/01/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.040905", "long": "-2.895509", "status": "planning", "mw": 49, "ext_id": "7029"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/06/2020", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe, Lancashire, LA3 2", "to": "Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2022", "to": "26/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/09/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "26/09/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Lancaster Power", "to": "Infra Balance New Energy", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7029", "Record Last Updated (dd/mm/yyyy)": "26/09/2022", "Operator (or Applicant)": "Infra Balance New Energy", "Site Name": "Middleton Clean Energy Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA32", "X-coordinate": "341454", "Y-coordinate": "460919", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "18/01203/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/01/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.040905", "long": "-2.895509", "status": "planning", "mw": 49, "ext_id": "7029"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Middleton Clean Energy Plant", "name_short": "Middleton Clean Energy Plant", "owner": "Infra Balance New Energy", "state": "north west", "country": "uk", "lat": "54.040905", "long": "-2.895509", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.040905+-2.895509", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Portadown Road", "city": "", "id": "311", "external_id": "7047", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon Storage Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-09-21", "start_construction": "2020-01-15", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "311", "external_id": "7047", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Portadown Road", "external_id": "7047", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Low Carbon Storage Ireland", "status": "construction", "date_first_heard": "2018-09-21", "start_construction": "2020-01-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.370189", "long": "-6.42882", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7047", "Record Last Updated (dd/mm/yyyy)": "23/06/2020", "Operator (or Applicant)": "Low Carbon Storage Ireland", "Site Name": "Portadown Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land @ & 100m S/E of, 87 Portadown Road, Immediately adjacent to NIE, Craigavon, Co Armagh", "County": "Co. Armagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT62 2BB", "X-coordinate": "112456", "Y-coordinate": "506231", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA08/2018/0851/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/09/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/09/2023", "Under Construction": "15/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "54.370189", "long": "-6.42882", "status": "construction", "mw": 50, "ext_id": "7047"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/06/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7047", "Record Last Updated (dd/mm/yyyy)": "23/06/2020", "Operator (or Applicant)": "Low Carbon Storage Ireland", "Site Name": "Portadown Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land @ & 100m S/E of, 87 Portadown Road, Immediately adjacent to NIE, Craigavon, Co Armagh", "County": "Co. Armagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT62 2BB", "X-coordinate": "112456", "Y-coordinate": "506231", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA08/2018/0851/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/09/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/09/2023", "Under Construction": "15/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "54.370189", "long": "-6.42882", "status": "construction", "mw": 50, "ext_id": "7047"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-09-21", "start_construction": "2020-01-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Portadown Road", "name_short": "Portadown Road", "owner": "Low Carbon Storage Ireland", "state": "northern ireland", "country": "uk", "lat": "54.370189", "long": "-6.42882", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.370189+-6.42882", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dungannon Energy Storage System", "city": "", "id": "312", "external_id": "7050", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon Storage Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-10-08", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "312", "external_id": "7050", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dungannon Energy Storage System", "external_id": "7050", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Low Carbon Storage Ireland", "status": "construction", "date_first_heard": "2018-10-08", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.512548", "long": "-6.675125", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7050", "Record Last Updated (dd/mm/yyyy)": "03/03/2020", "Operator (or Applicant)": "Low Carbon Storage Ireland", "Site Name": "Dungannon Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "77a Ballynakilly Road, Dungannon, Co Tyrone", "County": "Co. Tyrone", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT71 6HG", "X-coordinate": "97523", "Y-coordinate": "523089", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA09/2018/0803/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/10/2023", "Under Construction": "01/12/2019", "Operational": "", "Heat Network Ref": "", "lat": "54.512548", "long": "-6.675125", "status": "construction", "mw": 50, "ext_id": "7050"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/03/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/03/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7050", "Record Last Updated (dd/mm/yyyy)": "03/03/2020", "Operator (or Applicant)": "Low Carbon Storage Ireland", "Site Name": "Dungannon Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "77a Ballynakilly Road, Dungannon, Co Tyrone", "County": "Co. Tyrone", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT71 6HG", "X-coordinate": "97523", "Y-coordinate": "523089", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA09/2018/0803/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/10/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/10/2023", "Under Construction": "01/12/2019", "Operational": "", "Heat Network Ref": "", "lat": "54.512548", "long": "-6.675125", "status": "construction", "mw": 50, "ext_id": "7050"}, "current_month": "2024-01", "dates": {"first_heard": "2020-03-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-10-08", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dungannon Energy Storage System", "name_short": "Dungannon", "owner": "Low Carbon Storage Ireland", "state": "northern ireland", "country": "uk", "lat": "54.512548", "long": "-6.675125", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.512548+-6.675125", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Riverside Energy Park", "city": "", "id": "315", "external_id": "7036", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Cory Riverside Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "315", "external_id": "7036", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Riverside Energy Park", "external_id": "7036", "state": "london", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Cory Riverside Energy", "status": "planning", "date_first_heard": "2020-04-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.504508", "long": "0.153302", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7036", "Record Last Updated (dd/mm/yyyy)": "24/06/2020", "Operator (or Applicant)": "Cory Riverside Energy", "Site Name": "Riverside Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6535", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Norman Road, Bexley, London", "County": "London", "Region": "London", "Country": "England", "Post Code": "DA17 6JY", "X-coordinate": "549545", "Y-coordinate": "180595", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010093", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.504508", "long": "0.153302", "status": "planning", "mw": 20, "ext_id": "7036"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/06/2020", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "09/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/04/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7036", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Cory Riverside Energy", "Site Name": "Riverside Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6535", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Norman Road, Bexley, London", "County": "London", "Region": "London", "Country": "England", "Post Code": "DA17 6JY", "X-coordinate": "549545", "Y-coordinate": "180595", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010093", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.504508", "long": "0.153302", "status": "planning", "mw": 20, "ext_id": "7036"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2020-04-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Riverside Energy Park", "name_short": "Riverside Energy Park", "owner": "Cory Riverside Energy", "state": "london", "country": "uk", "lat": "51.504508", "long": "0.153302", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.504508+0.153302", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ellbridge Lane", "city": "", "id": "320", "external_id": "7051", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-08-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "320", "external_id": "7051", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ellbridge Lane", "external_id": "7051", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2019-08-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.447201", "long": "-4.249874", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7051", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Ellbridge Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sub Station, Ellbridge Lane, Hatt, Saltash, Cornwall", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6PU", "X-coordinate": "240358", "Y-coordinate": "63237", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA19/03935", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/08/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/08/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447201", "long": "-4.249874", "status": "planning", "mw": 49, "ext_id": "7051"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "23/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12697", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7051", "Record Last Updated (dd/mm/yyyy)": "23/11/2022", "Operator (or Applicant)": "Pivot Power", "Site Name": "Ellbridge Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12697", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sub Station, Ellbridge Lane, Hatt, Saltash, Cornwall", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6PU", "X-coordinate": "240358", "Y-coordinate": "63237", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA19/03935", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/08/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/08/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447201", "long": "-4.249874", "status": "planning", "mw": 49, "ext_id": "7051"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-08-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ellbridge Lane", "name_short": "Ellbridge Lane", "owner": "Pivot Power", "state": "south west", "country": "uk", "lat": "50.447201", "long": "-4.249874", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.447201+-4.249874", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elland Storage Project", "city": "", "id": "321", "external_id": "7053", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "321", "external_id": "7053", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Elland Storage Project", "external_id": "7053", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "planning", "date_first_heard": "2018-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7053", "Record Last Updated (dd/mm/yyyy)": "14/11/2019", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Elland Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "18/00478/192", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/04/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "7053"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "10236", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/11/2019", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/11/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7053", "Record Last Updated (dd/mm/yyyy)": "14/11/2019", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Elland Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10236", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "18/00478/192", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/04/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "7053"}, "current_month": "2024-01", "dates": {"first_heard": "2019-11-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2018-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Elland Storage Project", "name_short": "Elland Storage", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.692652+-1.82446", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Perseverance Road", "city": "", "id": "325", "external_id": "7061", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "325", "external_id": "7061", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Perseverance Road", "external_id": "7061", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Noriker Power", "status": "planning", "date_first_heard": "2018-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.068196", "long": "-2.719292", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7061", "Record Last Updated (dd/mm/yyyy)": "31/01/2020", "Operator (or Applicant)": "Noriker Power", "Site Name": "Perseverance Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Perseverance Road, Perseverance Road, Hereford, Hereford & Worcester", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR4 9SN", "X-coordinate": "350791", "Y-coordinate": "241336", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P181659/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/12/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/12/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.068196", "long": "-2.719292", "status": "planning", "mw": 20, "ext_id": "7061"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2020", "to": "29/11/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/11/2021", "to": "24/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land At Perseverance Road, Perseverance Road, Hereford, Hereford & Worcester", "to": "Land At Perseverance Road, Perseverance Road, Hereford, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "24/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7061", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Noriker Power", "Site Name": "Perseverance Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7966", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Perseverance Road, Perseverance Road, Hereford, ", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR4 9SN", "X-coordinate": "350791", "Y-coordinate": "241336", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P181659/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/12/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/12/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.068196", "long": "-2.719292", "status": "planning", "mw": 20, "ext_id": "7061"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2018-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Perseverance Road", "name_short": "Perseverance Road", "owner": "Noriker Power", "state": "west midlands", "country": "uk", "lat": "52.068196", "long": "-2.719292", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.068196+-2.719292", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cottam Power Station", "city": "", "id": "326", "external_id": "7066", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "326", "external_id": "7066", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cottam Power Station", "external_id": "7066", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "EDF Energy", "status": "planning", "date_first_heard": "2018-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.299901", "long": "-0.779313", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7066", "Record Last Updated (dd/mm/yyyy)": "12/08/2020", "Operator (or Applicant)": "EDF Energy", "Site Name": "Cottam Power Station", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Cottam Power Station, Cottam, Retford, Nottinghamshire", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 0EU", "X-coordinate": "481450", "Y-coordinate": "378800", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "18/00249/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/02/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.299901", "long": "-0.779313", "status": "planning", "mw": 49, "ext_id": "7066"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/08/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/08/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7066", "Record Last Updated (dd/mm/yyyy)": "12/08/2020", "Operator (or Applicant)": "EDF Energy", "Site Name": "Cottam Power Station", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cottam Power Station, Cottam, Retford, Nottinghamshire", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 0EU", "X-coordinate": "481450", "Y-coordinate": "378800", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "18/00249/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/02/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.299901", "long": "-0.779313", "status": "planning", "mw": 49, "ext_id": "7066"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2018-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cottam Power Station", "name_short": "Cottam Power Station", "owner": "EDF Energy", "state": "east midlands", "country": "uk", "lat": "53.299901", "long": "-0.779313", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.299901+-0.779313", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gloucestershire Science and Technology Park", "city": "", "id": "327", "external_id": "7067", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "327", "external_id": "7067", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gloucestershire Science and Technology Park", "external_id": "7067", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Ecotricity", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.689953", "long": "-2.498942", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7067", "Record Last Updated (dd/mm/yyyy)": "14/03/2022", "Operator (or Applicant)": "Ecotricity", "Site Name": "Gloucestershire Science and Technology Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10796", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hamfield Lane, Berkeley, ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL13 9FB", "X-coordinate": "365607", "Y-coordinate": "199140", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.18/0019/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/01/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/04/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.689953", "long": "-2.498942", "status": "planning", "mw": 30, "ext_id": "7067"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7067", "Record Last Updated (dd/mm/yyyy)": "14/03/2022", "Operator (or Applicant)": "Ecotricity", "Site Name": "Gloucestershire Science and Technology Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10796", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hamfield Lane, Berkeley, ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL13 9FB", "X-coordinate": "365607", "Y-coordinate": "199140", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.18/0019/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/01/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/04/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.689953", "long": "-2.498942", "status": "planning", "mw": 30, "ext_id": "7067"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Gloucestershire Science and Technology Park", "name_short": "Gloucestershire Science and Technol...", "owner": "Ecotricity", "state": "south west", "country": "uk", "lat": "51.689953", "long": "-2.498942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.689953+-2.498942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sundridge Hill", "city": "", "id": "331", "external_id": "7081", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "331", "external_id": "7081", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sundridge Hill", "external_id": "7081", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RNA Energy", "status": "construction", "date_first_heard": "2017-12-29", "start_construction": "2022-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.376545", "long": "0.464968", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7081", "Record Last Updated (dd/mm/yyyy)": "27/01/2020", "Operator (or Applicant)": "RNA Energy", "Site Name": "Sundridge Hill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To South Of A228, Sundridge Hill, Cuxton, Rochester, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME2 1LB", "X-coordinate": "571652", "Y-coordinate": "167049", "Planning Authority": "Medway Council", "Planning Application Reference": "MC/17/3770", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.376545", "long": "0.464968", "status": "planning", "mw": 49, "ext_id": "7081"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/01/2020", "to": "17/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land To South Of A228, Sundridge Hill, Cuxton, Rochester, Kent", "to": "Land To South Of A228, Sundridge Hill, Cuxton, Rochester,", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/03/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7081", "Record Last Updated (dd/mm/yyyy)": "17/03/2022", "Operator (or Applicant)": "RNA Energy", "Site Name": "Sundridge Hill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To South Of A228, Sundridge Hill, Cuxton, Rochester,", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME2 1LB", "X-coordinate": "571652", "Y-coordinate": "167049", "Planning Authority": "Medway Council", "Planning Application Reference": "MC/17/3770", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/02/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.376545", "long": "0.464968", "status": "construction", "mw": 49, "ext_id": "7081"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-27", "start_construction": "2022-03-17", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-12-29", "start_construction": "2022-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sundridge Hill", "name_short": "Sundridge Hill", "owner": "RNA Energy", "state": "south east", "country": "uk", "lat": "51.376545", "long": "0.464968", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.376545+0.464968", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land Adjacent to 4 Redcote Lane (Armley)", "city": "", "id": "334", "external_id": "7111", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Enstor (formerly CJ Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-06-07", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "334", "external_id": "7111", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land Adjacent to 4 Redcote Lane (Armley)", "external_id": "7111", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Enstor (formerly CJ Energy)", "status": "planning", "date_first_heard": "2019-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.804052", "long": "-1.592014", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7111", "Record Last Updated (dd/mm/yyyy)": "12/08/2020", "Operator (or Applicant)": "Enstor (formerly CJ Energy)", "Site Name": "Land Adjacent to 4 Redcote Lane (Armley)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Adjacent, 4 Redcote Lane, Armley, Leeds, West Yorkshire", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS4 2AL", "X-coordinate": "426967", "Y-coordinate": "434272", "Planning Authority": "Leeds City Council", "Planning Application Reference": "17/06830/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2022", "Under Construction": "01/06/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.804052", "long": "-1.592014", "status": "construction", "mw": 49, "ext_id": "7111"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/08/2020", "to": "19/01/2022", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Adjacent, 4 Redcote Lane, Armley, Leeds, West Yorkshire", "to": "Land Adjacent, 4 Redcote Lane, Armley, Leeds, ", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/06/2021", "to": "01/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Development Status", "from": "Under Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12224", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/02/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/01/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "19/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7111", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Enstor (formerly CJ Energy)", "Site Name": "Land Adjacent to 4 Redcote Lane (Armley)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12224", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent, 4 Redcote Lane, Armley, Leeds, ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS4 2AL", "X-coordinate": "426967", "Y-coordinate": "434272", "Planning Authority": "Leeds City Council", "Planning Application Reference": "17/06830/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.804052", "long": "-1.592014", "status": "planning", "mw": 49, "ext_id": "7111"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-06-07", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Land Adjacent to 4 Redcote Lane (Armley)", "name_short": "Land Adjacent to 4 Redcote Lane (Ar...", "owner": "Enstor (formerly CJ Energy)", "state": "yorkshire and humber", "country": "uk", "lat": "53.804052", "long": "-1.592014", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.804052+-1.592014", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Maldon Hall", "city": "", "id": "337", "external_id": "7095", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "337", "external_id": "7095", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Maldon Hall", "external_id": "7095", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Green Investment Group", "status": "planning", "date_first_heard": "2019-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.729339", "long": "0.671188", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7095", "Record Last Updated (dd/mm/yyyy)": "24/07/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Maldon Hall", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land North West Of Maldon Hall, Spital Road, Maldon, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM9 6D", "X-coordinate": "584569", "Y-coordinate": "206779", "Planning Authority": "Maldon District Council", "Planning Application Reference": "17/01106/FUL", "Appeal Reference": "APP/X1545/W/18/3204562", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/12/2017", "Appeal Lodged": "14/01/2019", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "13/05/2019", "Planning Permission Granted": "13/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.729339", "long": "0.671188", "status": "planning", "mw": 40, "ext_id": "7095"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/07/2020", "to": "23/12/2021", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Capbal", "to": "Green Investment Group", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land North West Of Maldon Hall, Spital Road, Maldon, Essex", "to": "Land North West Of Maldon Hall, Spital Road, Maldon", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "13/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/12/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7095", "Record Last Updated (dd/mm/yyyy)": "23/12/2021", "Operator (or Applicant)": "Green Investment Group", "Site Name": "Maldon Hall", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North West Of Maldon Hall, Spital Road, Maldon", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM9 6D", "X-coordinate": "584569", "Y-coordinate": "206779", "Planning Authority": "Maldon District Council", "Planning Application Reference": "17/01106/FUL", "Appeal Reference": "APP/X1545/W/18/3204562", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/12/2017", "Appeal Lodged": "14/01/2019", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "13/05/2019", "Planning Permission Granted": "13/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/05/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.729339", "long": "0.671188", "status": "planning", "mw": 40, "ext_id": "7095"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2019-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Maldon Hall", "name_short": "Maldon Hall", "owner": "Green Investment Group", "state": "eastern", "country": "uk", "lat": "51.729339", "long": "0.671188", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.729339+0.671188", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rubber and Allied Products", "city": "", "id": "339", "external_id": "7096", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "339", "external_id": "7096", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rubber and Allied Products", "external_id": "7096", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Volta Energy Storage", "status": "planning", "date_first_heard": "2017-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.033644", "long": "-2.24969", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7096", "Record Last Updated (dd/mm/yyyy)": "20/04/2020", "Operator (or Applicant)": "Volta Energy Storage", "Site Name": "Rubber and Allied Products", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Rubber & Allied Products Ltd, Turner Crescent, Newcastle-Under-Lyme, Staffordshire", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST5 7LU", "X-coordinate": "383353", "Y-coordinate": "348514", "Planning Authority": "Newcastle Under Lyme Borough Council", "Planning Application Reference": "17/00847/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.033644", "long": "-2.24969", "status": "planning", "mw": 40, "ext_id": "7096"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/04/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/12/2020", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/04/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7096", "Record Last Updated (dd/mm/yyyy)": "20/04/2020", "Operator (or Applicant)": "Volta Energy Storage", "Site Name": "Rubber and Allied Products", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rubber & Allied Products Ltd, Turner Crescent, Newcastle-Under-Lyme, Staffordshire", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST5 7LU", "X-coordinate": "383353", "Y-coordinate": "348514", "Planning Authority": "Newcastle Under Lyme Borough Council", "Planning Application Reference": "17/00847/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.033644", "long": "-2.24969", "status": "planning", "mw": 40, "ext_id": "7096"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2017-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rubber and Allied Products", "name_short": "Rubber and Allied Products", "owner": "Volta Energy Storage", "state": "west midlands", "country": "uk", "lat": "53.033644", "long": "-2.24969", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.033644+-2.24969", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stockbridge Road", "city": "", "id": "340", "external_id": "7097", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Winchester Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "340", "external_id": "7097", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stockbridge Road", "external_id": "7097", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Winchester Power", "status": "planning", "date_first_heard": "2017-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.079417", "long": "-1.345973", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7097", "Record Last Updated (dd/mm/yyyy)": "25/02/2020", "Operator (or Applicant)": "Winchester Power", "Site Name": "Stockbridge Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Stockbridge Road Energy Storag, Land adjacent to B3049, Salters Lane, Winchester, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO22 5FP", "X-coordinate": "445912", "Y-coordinate": "131325", "Planning Authority": "Winchester City Council", "Planning Application Reference": "17/02575/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.079417", "long": "-1.345973", "status": "planning", "mw": 10, "ext_id": "7097"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "14/12/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/02/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/02/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7097", "Record Last Updated (dd/mm/yyyy)": "25/02/2020", "Operator (or Applicant)": "Winchester Power", "Site Name": "Stockbridge Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stockbridge Road Energy Storag, Land adjacent to B3049, Salters Lane, Winchester, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO22 5FP", "X-coordinate": "445912", "Y-coordinate": "131325", "Planning Authority": "Winchester City Council", "Planning Application Reference": "17/02575/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.079417", "long": "-1.345973", "status": "planning", "mw": 10, "ext_id": "7097"}, "current_month": "2024-01", "dates": {"first_heard": "2020-02-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2017-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stockbridge Road", "name_short": "Stockbridge Road", "owner": "Winchester Power", "state": "south east", "country": "uk", "lat": "51.079417", "long": "-1.345973", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.079417+-1.345973", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land North of Thornton Road", "city": "", "id": "347", "external_id": "7131", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "South Redhouse", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "347", "external_id": "7131", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land North of Thornton Road", "external_id": "7131", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "South Redhouse", "status": "planning", "date_first_heard": "2016-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.146096", "long": "-3.142677", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7131", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "South Redhouse", "Site Name": "Land North of Thornton Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5797", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land North of, Thornton Road, Redhouse Grid Substation, Kirkcaldy, Fife", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1", "X-coordinate": "329101", "Y-coordinate": "695410", "Planning Authority": "Fife Council", "Planning Application Reference": "15/04010/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2015", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/02/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.146096", "long": "-3.142677", "status": "planning", "mw": 19, "ext_id": "7131"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "10/02/2019", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "29/04/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7131", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "South Redhouse", "Site Name": "Land North of Thornton Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5797", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North of, Thornton Road, Redhouse Grid Substation, Kirkcaldy, Fife", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1", "X-coordinate": "329101", "Y-coordinate": "695410", "Planning Authority": "Fife Council", "Planning Application Reference": "15/04010/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2015", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/02/2016", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/02/2019", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.146096", "long": "-3.142677", "status": "planning", "mw": 19, "ext_id": "7131"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2016-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Land North of Thornton Road", "name_short": "Land North of Thornton Road", "owner": "South Redhouse", "state": "scotland", "country": "uk", "lat": "56.146096", "long": "-3.142677", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.146096+-3.142677", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North West Of Jameston Farm", "city": "", "id": "348", "external_id": "7133", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "348", "external_id": "7133", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "North West Of Jameston Farm", "external_id": "7133", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Private Developer", "status": "planning", "date_first_heard": "2021-08-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.690455", "long": "-4.671208", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7133", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "North West Of Jameston Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "North West Of Jameston Farm, Dalry, Strathclyde", "County": "North Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 4EY", "X-coordinate": "232189", "Y-coordinate": "647344", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "21/00689/MSC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.690455", "long": "-4.671208", "status": "planning", "mw": 19, "ext_id": "7133"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7133", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "North West Of Jameston Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North West Of Jameston Farm, Dalry, Strathclyde", "County": "North Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 4EY", "X-coordinate": "232189", "Y-coordinate": "647344", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "21/00689/MSC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.690455", "long": "-4.671208", "status": "planning", "mw": 19, "ext_id": "7133"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2021-08-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "North West Of Jameston Farm", "name_short": "North West Of Jameston Farm", "owner": "Private Developer", "state": "scotland", "country": "uk", "lat": "55.690455", "long": "-4.671208", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.690455+-4.671208", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Land Adj Harmer Warren Quarry", "city": "", "id": "351", "external_id": "7143", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "New Forest Energy (formerly Somerley Estate)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "351", "external_id": "7143", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Land Adj Harmer Warren Quarry", "external_id": "7143", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "New Forest Energy (formerly Somerley Estate)", "status": "construction", "date_first_heard": "2018-02-13", "start_construction": "2022-11-16", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.886637", "long": "-1.812153", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7143", "Record Last Updated (dd/mm/yyyy)": "09/12/2022", "Operator (or Applicant)": "New Forest Energy (formerly Somerley Estate)", "Site Name": "Land Adj Harmer Warren Quarry", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "BH24 3PZ", "X-coordinate": "413310", "Y-coordinate": "109700", "Planning Authority": "New Forest District Council", "Planning Application Reference": "17/11630", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/02/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "16/11/2022", "Operational": "", "Heat Network Ref": "", "lat": "50.886637", "long": "-1.812153", "status": "construction", "mw": 10, "ext_id": "7143"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/12/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/12/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7143", "Record Last Updated (dd/mm/yyyy)": "09/12/2022", "Operator (or Applicant)": "New Forest Energy (formerly Somerley Estate)", "Site Name": "Land Adj Harmer Warren Quarry", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "BH24 3PZ", "X-coordinate": "413310", "Y-coordinate": "109700", "Planning Authority": "New Forest District Council", "Planning Application Reference": "17/11630", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/11/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/02/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "16/11/2022", "Operational": "", "Heat Network Ref": "", "lat": "50.886637", "long": "-1.812153", "status": "construction", "mw": 10, "ext_id": "7143"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-02-13", "start_construction": "2022-11-16", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Land Adj Harmer Warren Quarry", "name_short": "Land Adj Harmer Warren Quarry", "owner": "New Forest Energy (formerly Somerley Estate)", "state": "south east", "country": "uk", "lat": "50.886637", "long": "-1.812153", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.886637+-1.812153", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane - Resubmission", "city": "", "id": "352", "external_id": "7149", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "352", "external_id": "7149", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane", "external_id": "7149", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Walker & Son (Hauliers) Limited", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.718198", "long": "-1.276097", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7149", "Record Last Updated (dd/mm/yyyy)": "20/04/2020", "Operator (or Applicant)": "Volta Energy Storage", "Site Name": "Kirkhaw Lane - Resubmission", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, West Yorkshire", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447870", "Y-coordinate": "424886", "Planning Authority": "Wakefield Council", "Planning Application Reference": "17/02739/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.718198", "long": "-1.276097", "status": "planning", "mw": 20, "ext_id": "7149"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/04/2020", "to": "10/01/2022", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, West Yorkshire", "to": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2022", "to": "24/02/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Volta Energy Storage", "to": "Walker & Son (Hauliers) Limited", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Kirkhaw Lane - Resubmission", "to": "Kirkhaw Lane", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Co-located with fossil fuel plant", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Wakefield Council", "to": "Wakefield Metropolitan District Council", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "24/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7149", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8430", "Are they re-applying (Old REPD Ref) ": "", "Address": "Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447870", "Y-coordinate": "424886", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "17/02739/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.718198", "long": "-1.276097", "status": "planning", "mw": 20, "ext_id": "7149"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane", "name_short": "Kirkhaw Lane", "owner": "Walker & Son (Hauliers) Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.718198", "long": "-1.276097", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.718198+-1.276097", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greenburn Wind Park", "city": "", "id": "355", "external_id": "7159", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Energy Consents And Deployment Unit", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "355", "external_id": "7159", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Greenburn Wind Park", "external_id": "7159", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "REG Windpower Limited", "status": "planning", "date_first_heard": "2023-04-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.404377", "long": "-4.269049", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7159", "Record Last Updated (dd/mm/yyyy)": "24/06/2020", "Operator (or Applicant)": "Energy Consents And Deployment Unit", "Site Name": "Greenburn Wind Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7865", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land Adj Former Opencast, Greenburn Wind Park, New Cumnock, Cumnock, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256423", "Y-coordinate": "614614", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002037", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.404377", "long": "-4.269049", "status": "planning", "mw": 10, "ext_id": "7159"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/06/2020", "to": "10/05/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Energy Consents And Deployment Unit", "to": "REG Windpower Limited", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/04/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/04/2029", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7159", "Record Last Updated (dd/mm/yyyy)": "10/05/2023", "Operator (or Applicant)": "REG Windpower Limited", "Site Name": "Greenburn Wind Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7865", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adj Former Opencast, Greenburn Wind Park, New Cumnock, Cumnock, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256423", "Y-coordinate": "614614", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002037", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/04/2029", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.404377", "long": "-4.269049", "status": "planning", "mw": 10, "ext_id": "7159"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-04-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Greenburn Wind Park", "name_short": "Greenburn Wind Park", "owner": "REG Windpower Limited", "state": "scotland", "country": "uk", "lat": "55.404377", "long": "-4.269049", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.404377+-4.269049", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Braintree Road Substation", "city": "", "id": "356", "external_id": "7161", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-01-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "356", "external_id": "7161", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Braintree Road Substation", "external_id": "7161", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2019-01-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.864838", "long": "0.578226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7161", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Braintree Road Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Electricity Sub Station, Braintree Road, 209m From Hoppit House Braintr, 65m From Unnamed Road Cressing, Braintree, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM77 8DJ", "X-coordinate": "577617", "Y-coordinate": "221615", "Planning Authority": "Braintree District Council", "Planning Application Reference": "18/01927/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.864838", "long": "0.578226", "status": "planning", "mw": 49, "ext_id": "7161"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "06/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "11995", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "06/09/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7161", "Record Last Updated (dd/mm/yyyy)": "06/09/2022", "Operator (or Applicant)": "Pivot Power", "Site Name": "Braintree Road Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11995", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Sub Station, Braintree Road, 209m From Hoppit House Braintr, 65m From Unnamed Road Cressing, Braintree, Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM77 8DJ", "X-coordinate": "577617", "Y-coordinate": "221615", "Planning Authority": "Braintree District Council", "Planning Application Reference": "18/01927/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.864838", "long": "0.578226", "status": "planning", "mw": 49, "ext_id": "7161"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-01-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Braintree Road Substation", "name_short": "Braintree Road Substation", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "51.864838", "long": "0.578226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.864838+0.578226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Osbaldwick Substation", "city": "", "id": "358", "external_id": "7172", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-02-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "358", "external_id": "7172", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Osbaldwick Substation", "external_id": "7172", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "construction", "date_first_heard": "2020-10-08", "start_construction": "2022-05-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.957798", "long": "-1.019392", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7172", "Record Last Updated (dd/mm/yyyy)": "14/11/2019", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Osbaldwick Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Os Field 5070, Hull Road, Dunnington, York, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO19 5L", "X-coordinate": "464442", "Y-coordinate": "451746", "Planning Authority": "York City Council", "Planning Application Reference": "18/02659/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/02/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/02/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.957798", "long": "-1.019392", "status": "planning", "mw": 49, "ext_id": "7172"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/11/2019", "to": "27/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Os Field 5070, Hull Road, Dunnington, York, North Yorkshire", "to": "Os Field 5070, Hull Road, Dunnington, York, ", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "18/02659/OUT", "to": "20/01515/REM", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "21/11/2018", "to": "21/08/2020", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "22/02/2019", "to": "08/10/2020", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "22/02/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/05/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/07/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7172", "Record Last Updated (dd/mm/yyyy)": "27/07/2022", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Osbaldwick Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Os Field 5070, Hull Road, Dunnington, York, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO19 5L", "X-coordinate": "464442", "Y-coordinate": "451746", "Planning Authority": "York City Council", "Planning Application Reference": "20/01515/REM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/05/2022", "Operational": "", "Heat Network Ref": "", "lat": "53.957798", "long": "-1.019392", "status": "construction", "mw": 49, "ext_id": "7172"}, "current_month": "2024-01", "dates": {"first_heard": "2019-11-14", "start_construction": "2022-07-27", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-10-08", "start_construction": "2022-05-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Osbaldwick Substation", "name_short": "Osbaldwick Substation", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.957798", "long": "-1.019392", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.957798+-1.019392", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Old Green Farm, Alveston Battery Storage", "city": "", "id": "360", "external_id": "7182", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "360", "external_id": "7182", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Old Green Farm, Alveston Battery Storage", "external_id": "7182", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Ecotricity", "status": "planning", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.559454", "long": "-2.506961", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7182", "Record Last Updated (dd/mm/yyyy)": "03/08/2020", "Operator (or Applicant)": "Ecotricity", "Site Name": "Old Green Farm, Alveston Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Agricultural Field Circa 600M South Of Earthcott Green And Circa 297M East Of The B4427", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS35 3TD", "X-coordinate": "364952", "Y-coordinate": "184630", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "PT17/1992/RVC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.559454", "long": "-2.506961", "status": "planning", "mw": 10, "ext_id": "7182"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/08/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "03/08/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7182", "Record Last Updated (dd/mm/yyyy)": "03/08/2020", "Operator (or Applicant)": "Ecotricity", "Site Name": "Old Green Farm, Alveston Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Agricultural Field Circa 600M South Of Earthcott Green And Circa 297M East Of The B4427", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS35 3TD", "X-coordinate": "364952", "Y-coordinate": "184630", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "PT17/1992/RVC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.559454", "long": "-2.506961", "status": "planning", "mw": 10, "ext_id": "7182"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Old Green Farm, Alveston Battery Storage", "name_short": "Old Green Farm, Alveston", "owner": "Ecotricity", "state": "south west", "country": "uk", "lat": "51.559454", "long": "-2.506961", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.559454+-2.506961", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wentlooge Renewable Energy Hub", "city": "", "id": "364", "external_id": "7192", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "62", "power_mw": "62", "customer": "", "owner": "Wentlooge Farmers' Solar Scheme", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "364", "external_id": "7192", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wentlooge Renewable Energy Hub", "external_id": "7192", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 62, "power_mw": 62, "owner": "Wentlooge Farmers' Solar Scheme", "status": "planning", "date_first_heard": "2019-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.531497", "long": "-3.045377", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7192", "Record Last Updated (dd/mm/yyyy)": "22/03/2019", "Operator (or Applicant)": "Wentlooge Farmers' Solar Scheme", "Site Name": "Wentlooge Renewable Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7191", "Installed Capacity (MWelec)": "62.5", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11279", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land SW of St Brides on the Gwent Levels", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "", "X-coordinate": "327583", "Y-coordinate": "181917", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3216558", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "10/09/2021", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.531497", "long": "-3.045377", "status": "planning", "mw": 62, "ext_id": "7192"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/03/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "22/03/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7192", "Record Last Updated (dd/mm/yyyy)": "22/03/2019", "Operator (or Applicant)": "Wentlooge Farmers' Solar Scheme", "Site Name": "Wentlooge Renewable Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7191", "Installed Capacity (MWelec)": "62.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11279", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land SW of St Brides on the Gwent Levels", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "", "X-coordinate": "327583", "Y-coordinate": "181917", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3216558", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "10/09/2021", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.531497", "long": "-3.045377", "status": "planning", "mw": 62, "ext_id": "7192"}, "current_month": "2024-01", "dates": {"first_heard": "2019-03-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 62, "mwh_is_estimate": true, "mwh": 62, "mwh_estimate": 62, "status": "planning", "status_class": "", "date_first_heard": "2019-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wentlooge Renewable Energy Hub", "name_short": "Wentlooge Renewable Energy Hub", "owner": "Wentlooge Farmers' Solar Scheme", "state": "wales", "country": "uk", "lat": "51.531497", "long": "-3.045377", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.531497+-3.045377", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Classic Marble Showers Site", "city": "", "id": "365", "external_id": "7208", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "48", "customer": "", "owner": "Engie Developments Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "365", "external_id": "7208", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Classic Marble Showers Site", "external_id": "7208", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 48, "power_mw": 48, "owner": "Engie Developments Ireland", "status": "planning", "date_first_heard": "2019-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.485653", "long": "-7.114167", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7208", "Record Last Updated (dd/mm/yyyy)": "16/04/2020", "Operator (or Applicant)": "Engie Developments Ireland", "Site Name": "Classic Marble Showers Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "48.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, Co Tyrone", "County": "Co. Fermanagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT70 2EW", "X-coordinate": "68914", "Y-coordinate": "522080", "Planning Authority": "Fermanagh and Omagh", "Planning Application Reference": "LA10/2018/1589/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.485653", "long": "-7.114167", "status": "planning", "mw": 48, "ext_id": "7208"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, Co Tyrone", "to": "South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/04/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "16/04/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7208", "Record Last Updated (dd/mm/yyyy)": "16/04/2020", "Operator (or Applicant)": "Engie Developments Ireland", "Site Name": "Classic Marble Showers Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "48", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7979", "Are they re-applying (Old REPD Ref) ": "", "Address": "South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, ", "County": "Co. Fermanagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT70 2EW", "X-coordinate": "68914", "Y-coordinate": "522080", "Planning Authority": "Fermanagh and Omagh", "Planning Application Reference": "LA10/2018/1589/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.485653", "long": "-7.114167", "status": "planning", "mw": 48, "ext_id": "7208"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 48, "mwh_is_estimate": true, "mwh": 48, "mwh_estimate": 48, "status": "planning", "status_class": "", "date_first_heard": "2019-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Classic Marble Showers Site", "name_short": "Classic Marble Showers Site", "owner": "Engie Developments Ireland", "state": "northern ireland", "country": "uk", "lat": "54.485653", "long": "-7.114167", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.485653+-7.114167", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pleasance Road", "city": "", "id": "366", "external_id": "7217", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Coronation Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "366", "external_id": "7217", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pleasance Road", "external_id": "7217", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Coronation Power", "status": "planning", "date_first_heard": "2019-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.537847", "long": "-3.272834", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7217", "Record Last Updated (dd/mm/yyyy)": "23/01/2020", "Operator (or Applicant)": "Coronation Power", "Site Name": "Pleasance Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land 130M S/E of, Pleasance Road, Coupar Angus Substation, Blairgowrie, Tayside", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9JB", "X-coordinate": "321821", "Y-coordinate": "739152", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "19/00513/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.537847", "long": "-3.272834", "status": "planning", "mw": 45, "ext_id": "7217"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/01/2020", "to": "08/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/03/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "08/03/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7217", "Record Last Updated (dd/mm/yyyy)": "08/03/2022", "Operator (or Applicant)": "Coronation Power", "Site Name": "Pleasance Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9997", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 130M S/E of, Pleasance Road, Coupar Angus Substation, Blairgowrie, Tayside", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9JB", "X-coordinate": "321821", "Y-coordinate": "739152", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "19/00513/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.537847", "long": "-3.272834", "status": "planning", "mw": 45, "ext_id": "7217"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2019-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Pleasance Road", "name_short": "Pleasance Road", "owner": "Coronation Power", "state": "scotland", "country": "uk", "lat": "56.537847", "long": "-3.272834", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.537847+-3.272834", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackpark Farm ", "city": "", "id": "367", "external_id": "7226", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Shires Hamilton ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "367", "external_id": "7226", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackpark Farm ", "external_id": "7226", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Shires Hamilton ", "status": "planning", "date_first_heard": "2019-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.211675", "long": "-3.827596", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7226", "Record Last Updated (dd/mm/yyyy)": "22/08/2019", "Operator (or Applicant)": "Shires Hamilton ", "Site Name": "Blackpark Farm ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Black Park Farm, Nairn, Highlands", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5HY", "X-coordinate": "289712", "Y-coordinate": "814915", "Planning Authority": "Highland Council", "Planning Application Reference": "19/00702/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.211675", "long": "-3.827596", "status": "planning", "mw": 20, "ext_id": "7226"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Black Park Farm, Nairn, Highlands", "to": "Black Park Farm, Nairn, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/08/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "22/08/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7226", "Record Last Updated (dd/mm/yyyy)": "22/08/2019", "Operator (or Applicant)": "Shires Hamilton ", "Site Name": "Blackpark Farm ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8105", "Are they re-applying (Old REPD Ref) ": "", "Address": "Black Park Farm, Nairn, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5HY", "X-coordinate": "289712", "Y-coordinate": "814915", "Planning Authority": "Highland Council", "Planning Application Reference": "19/00702/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.211675", "long": "-3.827596", "status": "planning", "mw": 20, "ext_id": "7226"}, "current_month": "2024-01", "dates": {"first_heard": "2019-08-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2019-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackpark Farm ", "name_short": "Blackpark Farm ", "owner": "Shires Hamilton ", "state": "scotland", "country": "uk", "lat": "57.211675", "long": "-3.827596", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.211675+-3.827596", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sundon Substation", "city": "", "id": "370", "external_id": "7283", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "370", "external_id": "7283", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sundon Substation", "external_id": "7283", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2019-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.930088", "long": "-0.498665", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7283", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Sundon Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sundon 400KV Substation, Waterend Lane, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UL", "X-coordinate": "503325", "Y-coordinate": "226795", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/19/00200/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.930088", "long": "-0.498665", "status": "planning", "mw": 49, "ext_id": "7283"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Sundon 400KV Substation, Waterend Lane, Chalton, Luton, Bedfordshire", "to": "Sundon 400KV Substation, Waterend Lane, Chalton,", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "30/04/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7283", "Record Last Updated (dd/mm/yyyy)": "30/04/2019", "Operator (or Applicant)": "Pivot Power", "Site Name": "Sundon Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9315", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sundon 400KV Substation, Waterend Lane, Chalton,", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UL", "X-coordinate": "503325", "Y-coordinate": "226795", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/19/00200/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.930088", "long": "-0.498665", "status": "planning", "mw": 49, "ext_id": "7283"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sundon Substation", "name_short": "Sundon Substation", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "51.930088", "long": "-0.498665", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.930088+-0.498665", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jamesfield Organic Centre", "city": "Abernethy", "id": "373", "external_id": "7315", "state": "fife", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 130", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "373", "external_id": "7315", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Jamesfield Organic Centre, Phase 2", "external_id": "7315", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Harmony Energy Storage", "status": "planning", "date_first_heard": "2019-03-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.342816", "long": "-3.291569", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7315", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Fife", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "320261", "Y-coordinate": "717467", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "18/02336/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/03/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/03/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.342816", "long": "-3.291569", "status": "planning", "mw": 19, "ext_id": "7315"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "26/01/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Jamesfield Organic Centre", "to": "Jamesfield Organic Centre, Phase 2", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Fife", "to": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, ", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "06/03/2022", "to": "30/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/01/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "07/03/2019", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7315", "Record Last Updated (dd/mm/yyyy)": "07/03/2019", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre, Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10863", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, ", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "320261", "Y-coordinate": "717467", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "18/02336/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/03/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.342816", "long": "-3.291569", "status": "planning", "mw": 19, "ext_id": "7315"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2019-03-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Jamesfield Organic Centre, Phase 2", "name_short": "Jamesfield Organic Centre, Phase 2", "owner": "Harmony Energy Storage", "state": "scotland", "country": "uk", "lat": "56.342816", "long": "-3.291569", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.342816+-3.291569", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 130"], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Troston Loch Wind Farm", "city": "", "id": "374", "external_id": "7333", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "374", "external_id": "7333", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Troston Loch Wind Farm", "external_id": "7333", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2020-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.187688", "long": "-4.06752", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7333", "Record Last Updated (dd/mm/yyyy)": "16/01/2021", "Operator (or Applicant)": "EDF Renewables", "Site Name": "Troston Loch Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6432", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Troston Loch Wind Farm, New Abbey, West Of Moniaive, Dumfries, Dumfries and Galloway", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG2 8EF", "X-coordinate": "268466", "Y-coordinate": "590107", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001785", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/12/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.187688", "long": "-4.06752", "status": "planning", "mw": 20, "ext_id": "7333"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/01/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "18/12/2020", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "EDF Renewables", "to": "EDF Energy Renewables", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "18/12/2023", "to": "18/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7333", "Record Last Updated (dd/mm/yyyy)": "18/12/2020", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Troston Loch Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6432", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Troston Loch Wind Farm, New Abbey, West Of Moniaive, Dumfries, Dumfries and Galloway", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG2 8EF", "X-coordinate": "268466", "Y-coordinate": "590107", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001785", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.187688", "long": "-4.06752", "status": "planning", "mw": 20, "ext_id": "7333"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2020-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Troston Loch Wind Farm", "name_short": "Troston Loch Wind Farm", "owner": "EDF Energy Renewables", "state": "scotland", "country": "uk", "lat": "55.187688", "long": "-4.06752", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.187688+-4.06752", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tollgate Farm Battery Storage (Resubmission)", "city": "", "id": "375", "external_id": "7335", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "375", "external_id": "7335", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tollgate Farm Battery Storage ", "external_id": "7335", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RNA Energy / Harmony Energy Storage/ Tag Energy UK", "status": "construction", "date_first_heard": "2018-01-05", "start_construction": "2022-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.735231", "long": "-0.237166", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7335", "Record Last Updated (dd/mm/yyyy)": "27/01/2020", "Operator (or Applicant)": "RNA Energy", "Site Name": "Tollgate Farm Battery Storage (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Tollgate Farm, Tollgate Road, North Mymms", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "AL4 0NY", "X-coordinate": "521828", "Y-coordinate": "205528", "Planning Authority": "Welwyn Hatfield Borough Council", "Planning Application Reference": "6/2017/2340/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.735231", "long": "-0.237166", "status": "planning", "mw": 49, "ext_id": "7335"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/01/2020", "to": "23/12/2021", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "RNA Energy", "to": "RNA Energy / Harmony Energy Storage/ Tag Energy UK", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/12/2021", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Tollgate Farm Battery Storage (Resubmission)", "to": "Tollgate Farm Battery Storage ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7335", "Record Last Updated (dd/mm/yyyy)": "01/02/2022", "Operator (or Applicant)": "RNA Energy / Harmony Energy Storage/ Tag Energy UK", "Site Name": "Tollgate Farm Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6949", "Address": "Tollgate Farm, Tollgate Road, North Mymms", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "AL4 0NY", "X-coordinate": "521828", "Y-coordinate": "205528", "Planning Authority": "Welwyn Hatfield Borough Council", "Planning Application Reference": "6/2017/2340/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/02/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.735231", "long": "-0.237166", "status": "construction", "mw": 49, "ext_id": "7335"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-27", "start_construction": "2022-02-01", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-01-05", "start_construction": "2022-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tollgate Farm Battery Storage ", "name_short": "Tollgate Farm Battery Storage ", "owner": "RNA Energy / Harmony Energy Storage/ Tag Energy UK", "state": "eastern", "country": "uk", "lat": "51.735231", "long": "-0.237166", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.735231+-0.237166", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Plot 2B EurolinkV", "city": "", "id": "378", "external_id": "7383", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Trenport Investments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "378", "external_id": "7383", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Plot 2B EurolinkV", "external_id": "7383", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Trenport Investments", "status": "construction", "date_first_heard": "2019-10-25", "start_construction": "2021-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.346306", "long": "0.769266", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7383", "Record Last Updated (dd/mm/yyyy)": "31/01/2020", "Operator (or Applicant)": "Trenport Investments", "Site Name": "Plot 2B EurolinkV", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne, Kent", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME9 9AR", "X-coordinate": "592954", "Y-coordinate": "164443", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "19/502257/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/10/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/10/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.346306", "long": "0.769266", "status": "planning", "mw": 20, "ext_id": "7383"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2020", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne, Kent", "to": "Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/12/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "13/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7383", "Record Last Updated (dd/mm/yyyy)": "13/12/2021", "Operator (or Applicant)": "Trenport Investments", "Site Name": "Plot 2B EurolinkV", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME9 9AR", "X-coordinate": "592954", "Y-coordinate": "164443", "Planning Authority": "Swale Borough Council", "Planning Application Reference": "19/502257/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/10/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/10/2022", "Under Construction": "01/10/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.346306", "long": "0.769266", "status": "construction", "mw": 20, "ext_id": "7383"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-31", "start_construction": "2021-12-13", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-10-25", "start_construction": "2021-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Plot 2B EurolinkV", "name_short": "Plot 2B EurolinkV", "owner": "Trenport Investments", "state": "south east", "country": "uk", "lat": "51.346306", "long": "0.769266", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.346306+0.769266", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aurora Solar Farm", "city": "", "id": "379", "external_id": "7385", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "Low Carbon UK Solar Investment Company", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "379", "external_id": "7385", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Aurora Solar Farm", "external_id": "7385", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 18, "power_mw": 18, "owner": "Low Carbon UK Solar Investment Company", "status": "construction", "date_first_heard": "2020-03-23", "start_construction": "2021-04-26", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.780977", "long": "-1.403578", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7385", "Record Last Updated (dd/mm/yyyy)": "04/06/2020", "Operator (or Applicant)": "Low Carbon UK Solar Investment Company", "Site Name": "Aurora Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7384", "Installed Capacity (MWelec)": "18.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, Oxfordshire", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX29 4BH", "X-coordinate": "441242", "Y-coordinate": "209314", "Planning Authority": "West Oxfordshire District Council", "Planning Application Reference": "19/02516/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.780977", "long": "-1.403578", "status": "planning", "mw": 18, "ext_id": "7385"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, Oxfordshire", "to": "Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/06/2020", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "26/04/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7385", "Record Last Updated (dd/mm/yyyy)": "23/03/2023", "Operator (or Applicant)": "Low Carbon UK Solar Investment Company", "Site Name": "Aurora Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7384", "Installed Capacity (MWelec)": "18", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, ", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX29 4BH", "X-coordinate": "441242", "Y-coordinate": "209314", "Planning Authority": "West Oxfordshire District Council", "Planning Application Reference": "19/02516/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/03/2023", "Under Construction": "26/04/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.780977", "long": "-1.403578", "status": "construction", "mw": 18, "ext_id": "7385"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 18, "mwh_is_estimate": true, "mwh": 18, "mwh_estimate": 18, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-03-23", "start_construction": "2021-04-26", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Aurora Solar Farm", "name_short": "Aurora Solar Farm", "owner": "Low Carbon UK Solar Investment Company", "state": "south east", "country": "uk", "lat": "51.780977", "long": "-1.403578", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.780977+-1.403578", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Harestanes Windfarm", "city": "", "id": "380", "external_id": "7395", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "380", "external_id": "7395", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Harestanes Windfarm", "external_id": "7395", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.264014", "long": "-3.560109", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7395", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Harestanes Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4119", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Harestanes Windfarm, Forest Of Ae, Northwest Of Ae Village, Moffat, Dumfries and Galloway", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "300958", "Y-coordinate": "597760", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001870", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.264014", "long": "-3.560109", "status": "planning", "mw": 100, "ext_id": "7395"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7395", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Harestanes Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4119", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Harestanes Windfarm, Forest Of Ae, Northwest Of Ae Village, Moffat, Dumfries and Galloway", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "300958", "Y-coordinate": "597760", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001870", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.264014", "long": "-3.560109", "status": "planning", "mw": 100, "ext_id": "7395"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Harestanes Windfarm", "name_short": "Harestanes Windfarm", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "55.264014", "long": "-3.560109", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.264014+-3.560109", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trevol Business Park", "city": "", "id": "382", "external_id": "7404", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Londonwide Properties", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "382", "external_id": "7404", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Trevol Business Park", "external_id": "7404", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Londonwide Properties", "status": "planning", "date_first_heard": "2019-09-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.376261", "long": "-4.226543", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7404", "Record Last Updated (dd/mm/yyyy)": "23/01/2020", "Operator (or Applicant)": "Londonwide Properties", "Site Name": "Trevol Business Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At, Trevol Business Park, Torpoint, Cornwall", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL11 2TB", "X-coordinate": "241778", "Y-coordinate": "55300", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA19/03228", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.376261", "long": "-4.226543", "status": "planning", "mw": 10, "ext_id": "7404"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/01/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7404", "Record Last Updated (dd/mm/yyyy)": "23/01/2020", "Operator (or Applicant)": "Londonwide Properties", "Site Name": "Trevol Business Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At, Trevol Business Park, Torpoint, Cornwall", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL11 2TB", "X-coordinate": "241778", "Y-coordinate": "55300", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA19/03228", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.376261", "long": "-4.226543", "status": "planning", "mw": 10, "ext_id": "7404"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2019-09-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Trevol Business Park", "name_short": "Trevol Business Park", "owner": "Londonwide Properties", "state": "south west", "country": "uk", "lat": "50.376261", "long": "-4.226543", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.376261+-4.226543", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Douglas West Wind Farm (extension)", "city": "", "id": "384", "external_id": "7460", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Douglas West Extension / 3R Energy Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "384", "external_id": "7460", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Douglas West Wind Farm (extension)", "external_id": "7460", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Douglas West Extension / 3R Energy Solutions", "status": "planning", "date_first_heard": "2019-07-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.587358", "long": "-3.890104", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7460", "Record Last Updated (dd/mm/yyyy)": "02/07/2019", "Operator (or Applicant)": "Douglas West Extension / 3R Energy Solutions", "Site Name": "Douglas West Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6826", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0NN", "X-coordinate": "280968", "Y-coordinate": "634257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001836", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.587358", "long": "-3.890104", "status": "planning", "mw": 20, "ext_id": "7460"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/07/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "02/07/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7460", "Record Last Updated (dd/mm/yyyy)": "02/07/2019", "Operator (or Applicant)": "Douglas West Extension / 3R Energy Solutions", "Site Name": "Douglas West Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6826", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0NN", "X-coordinate": "280968", "Y-coordinate": "634257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001836", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.587358", "long": "-3.890104", "status": "planning", "mw": 20, "ext_id": "7460"}, "current_month": "2024-01", "dates": {"first_heard": "2019-07-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2019-07-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Douglas West Wind Farm (extension)", "name_short": "Douglas West Wind Farm (extension)", "owner": "Douglas West Extension / 3R Energy Solutions", "state": "scotland", "country": "uk", "lat": "55.587358", "long": "-3.890104", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.587358+-3.890104", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Harker Grid Sub Station", "city": "", "id": "385", "external_id": "7462", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "385", "external_id": "7462", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Harker Grid Sub Station", "external_id": "7462", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2019-07-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.942299", "long": "-2.96397", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7462", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Harker Grid Sub Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land to the west of Harker Grid Sub Station, Low Harker, Harker, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4DQ", "X-coordinate": "338345", "Y-coordinate": "561274", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "19/0371", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/07/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.942299", "long": "-2.96397", "status": "planning", "mw": 49, "ext_id": "7462"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7462", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Harker Grid Sub Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the west of Harker Grid Sub Station, Low Harker, Harker, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4DQ", "X-coordinate": "338345", "Y-coordinate": "561274", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "19/0371", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/07/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.942299", "long": "-2.96397", "status": "planning", "mw": 49, "ext_id": "7462"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-07-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Harker Grid Sub Station", "name_short": "Harker Grid Sub Station", "owner": "Pivot Power", "state": "north west", "country": "uk", "lat": "54.942299", "long": "-2.96397", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.942299+-2.96397", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bramford Substation", "city": "", "id": "386", "external_id": "7479", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "386", "external_id": "7479", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bramford Substation", "external_id": "7479", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Pivot Power", "status": "construction", "date_first_heard": "2019-09-23", "start_construction": "2023-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.072856", "long": "1.065047", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7479", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Bramford Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land Adjacent To, Bullen Lane, Bramford, Ipswich, Suffolk", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP8 4JH", "X-coordinate": "610154", "Y-coordinate": "246043", "Planning Authority": "Mid Suffolk District Council", "Planning Application Reference": "DC/19/03008", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/09/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.072856", "long": "1.065047", "status": "planning", "mw": 49, "ext_id": "7479"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "23/05/2023", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "49.9", "to": "57", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 49, "to": 57, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7479", "Record Last Updated (dd/mm/yyyy)": "23/05/2023", "Operator (or Applicant)": "Pivot Power", "Site Name": "Bramford Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent To, Bullen Lane, Bramford, Ipswich, Suffolk", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP8 4JH", "X-coordinate": "610154", "Y-coordinate": "246043", "Planning Authority": "Mid Suffolk District Council", "Planning Application Reference": "DC/19/03008", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/09/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/09/2022", "Under Construction": "01/06/2023", "Operational": "", "Heat Network Ref": "", "lat": "52.072856", "long": "1.065047", "status": "construction", "mw": 57, "ext_id": "7479"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "2023-05-23", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-09-23", "start_construction": "2023-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bramford Substation", "name_short": "Bramford Substation", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "52.072856", "long": "1.065047", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.072856+1.065047", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Salisbury Substation", "city": "Salisbury", "id": "388", "external_id": "7510", "state": "wiltshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49.5", "customer": "", "owner": "SSE", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "Harmony sold in 2021", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "388", "external_id": "7510", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Salisbury Substation", "external_id": "7510", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "SSE Renewables", "status": "construction", "date_first_heard": "2020-03-05", "start_construction": "2022-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.082033", "long": "-1.852165", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7510", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Salisbury Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land Adjacent To, Salisbury Substation, Wilton, Salisbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SP2 0BL", "X-coordinate": "410452", "Y-coordinate": "131423", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/05443/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.082033", "long": "-1.852165", "status": "planning", "mw": 49, "ext_id": "7510"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "04/07/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Harmony Energy Storage", "to": "SSE Renewables", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Adjacent To, Salisbury Substation, Wilton, Salisbury, Wiltshire", "to": "Land Adjacent To, Salisbury Substation, Wilton, Salisbury, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/07/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/09/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "16/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7510", "Record Last Updated (dd/mm/yyyy)": "16/03/2023", "Operator (or Applicant)": "SSE Renewables", "Site Name": "Salisbury Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent To, Salisbury Substation, Wilton, Salisbury, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SP2 0BL", "X-coordinate": "410452", "Y-coordinate": "131423", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/05443/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/03/2023", "Under Construction": "01/09/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.082033", "long": "-1.852165", "status": "construction", "mw": 49, "ext_id": "7510"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-03-05", "start_construction": "2022-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Salisbury Substation", "name_short": "Salisbury Substation", "owner": "SSE Renewables", "state": "south west", "country": "uk", "lat": "51.082033", "long": "-1.852165", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.082033+-1.852165", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Harmony sold in 2021"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cowley electricity sub-station", "city": "", "id": "391", "external_id": "7571", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "391", "external_id": "7571", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cowley electricity sub-station", "external_id": "7571", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "construction", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.717588", "long": "-1.185977", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7571", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Cowley electricity sub-station", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Cowley Main Sub Station, Lower Blackberry Lane, Garsington, Oxford ", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX44 9BD", "X-coordinate": "456332", "Y-coordinate": "202409", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P19/S0623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/11/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.717588", "long": "-1.185977", "status": "construction", "mw": 49, "ext_id": "7571"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/09/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7571", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Cowley electricity sub-station", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cowley Main Sub Station, Lower Blackberry Lane, Garsington, Oxford ", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX44 9BD", "X-coordinate": "456332", "Y-coordinate": "202409", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P19/S0623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/02/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/07/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "15/11/2019", "Operational": "", "Heat Network Ref": "", "lat": "51.717588", "long": "-1.185977", "status": "construction", "mw": 49, "ext_id": "7571"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cowley electricity sub-station", "name_short": "Cowley electricity sub-station", "owner": "Pivot Power", "state": "south east", "country": "uk", "lat": "51.717588", "long": "-1.185977", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.717588+-1.185977", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lisnabreeny Road", "city": "", "id": "392", "external_id": "7556", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Energia Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "392", "external_id": "7556", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lisnabreeny Road", "external_id": "7556", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 36, "power_mw": 36, "owner": "Energia Group", "status": "planning", "date_first_heard": "2020-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.555765", "long": "-5.864088", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7556", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "Energia Group", "Site Name": "Lisnabreeny Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Lands to the southeast of, 1 Lisnabreeny Road East, Belfast, Co Antrim", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT6 9SS", "X-coordinate": "150249", "Y-coordinate": "524705", "Planning Authority": "Belfast City Council", "Planning Application Reference": "LA05/2019/0675/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.555765", "long": "-5.864088", "status": "planning", "mw": 36, "ext_id": "7556"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7556", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "Energia Group", "Site Name": "Lisnabreeny Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lands to the southeast of, 1 Lisnabreeny Road East, Belfast, Co Antrim", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT6 9SS", "X-coordinate": "150249", "Y-coordinate": "524705", "Planning Authority": "Belfast City Council", "Planning Application Reference": "LA05/2019/0675/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.555765", "long": "-5.864088", "status": "planning", "mw": 36, "ext_id": "7556"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 36, "mwh_is_estimate": true, "mwh": 36, "mwh_estimate": 36, "status": "planning", "status_class": "", "date_first_heard": "2020-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lisnabreeny Road", "name_short": "Lisnabreeny Road", "owner": "Energia Group", "state": "northern ireland", "country": "uk", "lat": "54.555765", "long": "-5.864088", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.555765+-5.864088", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hagshaw Hill", "city": "", "id": "393", "external_id": "7572", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-02-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "393", "external_id": "7572", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hagshaw Hill", "external_id": "7572", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Scottish Power Renewables", "status": "planning", "date_first_heard": "2020-02-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.559423", "long": "-3.870987", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7572", "Record Last Updated (dd/mm/yyyy)": "25/03/2020", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Hagshaw Hill", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7456", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Hagshaw Hill Wind Farm, Douglas, Lanark ", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0RR", "X-coordinate": "282089", "Y-coordinate": "631116", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000737", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/02/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/02/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.559423", "long": "-3.870987", "status": "planning", "mw": 20, "ext_id": "7572"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "26/02/2023", "to": "26/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/03/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "25/03/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7572", "Record Last Updated (dd/mm/yyyy)": "25/03/2020", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Hagshaw Hill", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7456", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hagshaw Hill Wind Farm, Douglas, Lanark ", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0RR", "X-coordinate": "282089", "Y-coordinate": "631116", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000737", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/02/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.559423", "long": "-3.870987", "status": "planning", "mw": 20, "ext_id": "7572"}, "current_month": "2024-01", "dates": {"first_heard": "2020-03-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2020-02-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hagshaw Hill", "name_short": "Hagshaw Hill", "owner": "Scottish Power Renewables", "state": "scotland", "country": "uk", "lat": "55.559423", "long": "-3.870987", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.559423+-3.870987", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bradford West Substation (Harrop Edge Farm Resubmission)", "city": "", "id": "397", "external_id": "7577", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "397", "external_id": "7577", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bradford West Substation (Harrop Edge Farm)", "external_id": "7577", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "construction", "date_first_heard": "2019-03-18", "start_construction": "2022-07-07", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.8095", "long": "-1.86127", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7577", "Record Last Updated (dd/mm/yyyy)": "15/11/2019", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Bradford West Substation (Harrop Edge Farm Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford West Yorkshire", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "", "X-coordinate": "409233", "Y-coordinate": "434810", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": " 18/03894/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/09/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/03/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/03/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.8095", "long": "-1.86127", "status": "planning", "mw": 49, "ext_id": "7577"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/11/2019", "to": "08/03/2022", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford West Yorkshire", "to": "Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford ", "extra": "", "change_type": "misc"}, {"name": "Post Code", "from": "", "to": "BD15 9AG", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/03/2022", "to": "08/07/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Bradford West Substation (Harrop Edge Farm Resubmission)", "to": "Bradford West Substation (Harrop Edge Farm)", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/03/2022", "to": "07/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/07/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "08/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7577", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Bradford West Substation (Harrop Edge Farm)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7045", "Address": "Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD15 9AG", "X-coordinate": "409233", "Y-coordinate": "434810", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": " 18/03894/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/09/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/03/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/03/2022", "Under Construction": "07/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "53.8095", "long": "-1.86127", "status": "construction", "mw": 49, "ext_id": "7577"}, "current_month": "2024-01", "dates": {"first_heard": "2019-11-15", "start_construction": "2022-07-08", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-03-18", "start_construction": "2022-07-07", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bradford West Substation (Harrop Edge Farm)", "name_short": "Bradford West Substation (Harrop Ed...", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.8095", "long": "-1.86127", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.8095+-1.86127", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Crown Farm", "city": "", "id": "399", "external_id": "7606", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "399", "external_id": "7606", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lapwing Fen II, Crown Farm", "external_id": "7606", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Private Developer", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.723316", "long": "0.171334", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7606", "Record Last Updated (dd/mm/yyyy)": "07/09/2020", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Crown Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Crown Farm, Mill Road, West Walton, Wisbech, Cambridgeshire", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7EU", "X-coordinate": "546741", "Y-coordinate": "316174", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02002/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.723316", "long": "0.171334", "status": "planning", "mw": 49, "ext_id": "7606"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Address", "from": "Crown Farm, Mill Road, West Walton, Wisbech, Cambridgeshire", "to": "Crown Farm, Mill Road, West Walton, Wisbech, ", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Norfolk", "to": "Cambridgeshire", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/09/2020", "to": "15/09/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Crown Farm", "to": "Lapwing Fen II, Crown Farm", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2022", "to": "22/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Operator (or Applicant)", "from": "Tribus Clean Energy", "to": "Private Developer", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7606", "Record Last Updated (dd/mm/yyyy)": "22/11/2022", "Operator (or Applicant)": "Private Developer", "Site Name": "Lapwing Fen II, Crown Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Crown Farm, Mill Road, West Walton, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7EU", "X-coordinate": "546741", "Y-coordinate": "316174", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02002/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.723316", "long": "0.171334", "status": "planning", "mw": 49, "ext_id": "7606"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lapwing Fen II, Crown Farm", "name_short": "Lapwing Fen II, Crown Farm", "owner": "Private Developer", "state": "eastern", "country": "uk", "lat": "52.723316", "long": "0.171334", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.723316+0.171334", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gipsy Lane", "city": "", "id": "400", "external_id": "7632", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-03-20", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "400", "external_id": "7632", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gipsy Lane", "external_id": "7632", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Arlington Energy", "status": "construction", "date_first_heard": "2020-03-20", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.597651", "long": "-2.178606", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7632", "Record Last Updated (dd/mm/yyyy)": "05/08/2021", "Operator (or Applicant)": "Arlington Energy", "Site Name": "Gipsy Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale,", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "OL11 3HF", "X-coordinate": "388277", "Y-coordinate": "411246", "Planning Authority": "Rochdale Borough Council", "Planning Application Reference": "19/01147/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/03/2023", "Under Construction": "01/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.597651", "long": "-2.178606", "status": "construction", "mw": 20, "ext_id": "7632"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/08/2021", "to": "12/01/2022", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale,", "to": "Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Planning Authority", "from": "Rochdale Borough Council", "to": "Rochdale Metropolitan Borough Council", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2022", "to": "01/07/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7632", "Record Last Updated (dd/mm/yyyy)": "01/07/2021", "Operator (or Applicant)": "Arlington Energy", "Site Name": "Gipsy Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "OL11 3HF", "X-coordinate": "388277", "Y-coordinate": "411246", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "19/01147/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/03/2023", "Under Construction": "01/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.597651", "long": "-2.178606", "status": "construction", "mw": 20, "ext_id": "7632"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-03-20", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Gipsy Lane", "name_short": "Gipsy Lane", "owner": "Arlington Energy", "state": "north west", "country": "uk", "lat": "53.597651", "long": "-2.178606", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.597651+-2.178606", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Model Farm", "city": "", "id": "401", "external_id": "7609", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "401", "external_id": "7609", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Model Farm", "external_id": "7609", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Tribus Clean Energy", "status": "planning", "date_first_heard": "2020-03-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.728144", "long": "0.195226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7609", "Record Last Updated (dd/mm/yyyy)": "13/09/2021", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Model Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, Cambridgeshire", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JF", "X-coordinate": "548338", "Y-coordinate": "316760", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "21/01715/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.728144", "long": "0.195226", "status": "planning", "mw": 49, "ext_id": "7609"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/09/2021", "to": "24/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, Cambridgeshire", "to": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, ", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Norfolk", "to": "Cambridgeshire", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/01715/FM", "to": "19/02003/F", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "31/08/2021", "to": "20/11/2019", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/03/2020", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7609", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Model Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10687", "Are they re-applying (Old REPD Ref) ": "", "Address": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JF", "X-coordinate": "548338", "Y-coordinate": "316760", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02003/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.728144", "long": "0.195226", "status": "planning", "mw": 49, "ext_id": "7609"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-03-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Model Farm", "name_short": "Model Farm", "owner": "Tribus Clean Energy", "state": "eastern", "country": "uk", "lat": "52.728144", "long": "0.195226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.728144+0.195226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Flower Farm", "city": "", "id": "402", "external_id": "7614", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "402", "external_id": "7614", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lapwing Fen 2 - Battery Storage Plant", "external_id": "7614", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 250, "power_mw": 250, "owner": "Tribus Clean Energy", "status": "construction", "date_first_heard": "2020-03-19", "start_construction": "2022-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.728614", "long": "0.172175", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7614", "Record Last Updated (dd/mm/yyyy)": "07/09/2020", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Flower Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, Cambridgeshire", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JG", "X-coordinate": "546780", "Y-coordinate": "316765", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02004/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/03/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.728614", "long": "0.172175", "status": "planning", "mw": 49, "ext_id": "7614"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/09/2020", "to": "21/02/2022", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, Cambridgeshire", "to": "Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, ", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Norfolk", "to": "Cambridgeshire", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/02/2022", "to": "08/06/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Flower Farm", "to": "Lapwing Fen 2 - Battery Storage Plant", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "49.90", "to": "250", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 49, "to": 250, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7614", "Record Last Updated (dd/mm/yyyy)": "08/06/2022", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Lapwing Fen 2 - Battery Storage Plant", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "250", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JG", "X-coordinate": "546780", "Y-coordinate": "316765", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "19/02004/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/03/2023", "Under Construction": "01/06/2022", "Operational": "", "Heat Network Ref": "", "lat": "52.728614", "long": "0.172175", "status": "construction", "mw": 250, "ext_id": "7614"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-07", "start_construction": "2022-06-08", "start_operation": ""}, "month_disappeared": ""}, "mw": 250, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-03-19", "start_construction": "2022-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lapwing Fen 2 - Battery Storage Plant", "name_short": "Lapwing Fen 2 - Battery Storage Pla...", "owner": "Tribus Clean Energy", "state": "eastern", "country": "uk", "lat": "52.728614", "long": "0.172175", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.728614+0.172175", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holes Bay", "city": "Poole", "id": "404", "external_id": "7688", "state": "dorset", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 17", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "404", "external_id": "7688", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holes Bay", "external_id": "7688", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Harmony Energy", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.726324", "long": "-1.990215", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7688", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Holes Bay", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land at Sterte Avenue West, Poole", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH15 2AL", "X-coordinate": "400787", "Y-coordinate": "91856", "Planning Authority": "Poole Borough Council", "Planning Application Reference": "APP/17/00186/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/02/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/01/2023", "Under Construction": "01/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "50.726324", "long": "-1.990215", "status": "construction", "mw": 15, "ext_id": "7688"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "14/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7688", "Record Last Updated (dd/mm/yyyy)": "14/01/2020", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Holes Bay", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Sterte Avenue West, Poole", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH15 2AL", "X-coordinate": "400787", "Y-coordinate": "91856", "Planning Authority": "Poole Borough Council", "Planning Application Reference": "APP/17/00186/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/02/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/01/2023", "Under Construction": "01/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "50.726324", "long": "-1.990215", "status": "construction", "mw": 15, "ext_id": "7688"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holes Bay", "name_short": "Holes Bay", "owner": "Harmony Energy", "state": "south west", "country": "uk", "lat": "50.726324", "long": "-1.990215", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.726324+-1.990215", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 17"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "East Ballochy", "city": "", "id": "406", "external_id": "7675", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "406", "external_id": "7675", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Ballochy", "external_id": "7675", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2020-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.746891", "long": "-2.540601", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7675", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "East Ballochy", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7674", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Field 400M SE Of East Ballochy, East Ballochy, Montrose, Tayside", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD10 9LP", "X-coordinate": "367035", "Y-coordinate": "761826", "Planning Authority": "Angus Council", "Planning Application Reference": "20/00019/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/09/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/09/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.746891", "long": "-2.540601", "status": "planning", "mw": 10, "ext_id": "7675"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "15/09/2020", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7675", "Record Last Updated (dd/mm/yyyy)": "15/09/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "East Ballochy", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7674", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "1882", "Address": "Field 400M SE Of East Ballochy, East Ballochy, Montrose, Tayside", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD10 9LP", "X-coordinate": "367035", "Y-coordinate": "761826", "Planning Authority": "Angus Council", "Planning Application Reference": "20/00019/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/09/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/09/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.746891", "long": "-2.540601", "status": "planning", "mw": 10, "ext_id": "7675"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2020-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Ballochy", "name_short": "East Ballochy", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "56.746891", "long": "-2.540601", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.746891+-2.540601", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thurrock Flexible Generation Plant", "city": "", "id": "407", "external_id": "7696", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "RPS Group / Thurrock Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "407", "external_id": "7696", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Thurrock Flexible Generation Plant", "external_id": "7696", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "Thurrock Power", "status": "planning", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.457726", "long": "0.383815", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7696", "Record Last Updated (dd/mm/yyyy)": "06/07/2020", "Operator (or Applicant)": "RPS Group / Thurrock Power", "Site Name": "Thurrock Flexible Generation Plant", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Thurrock Flexible Generation Plant Fort Road Tilbury Essex", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "RM18 8UJ", "X-coordinate": "565711", "Y-coordinate": "175889", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010092", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/06/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.457726", "long": "0.383815", "status": "planning", "mw": 150, "ext_id": "7696"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/07/2020", "to": "26/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "RPS Group / Thurrock Power", "to": "Thurrock Power", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Thurrock Flexible Generation Plant Fort Road Tilbury Essex", "to": "Thurrock Flexible Generation Plant Fort Road Tilbury", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "16/02/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/05/2022", "to": "04/10/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7696", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Thurrock Power", "Site Name": "Thurrock Flexible Generation Plant", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thurrock Flexible Generation Plant Fort Road Tilbury", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "RM18 8UJ", "X-coordinate": "565711", "Y-coordinate": "175889", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010092", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/06/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/02/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.457726", "long": "0.383815", "status": "planning", "mw": 150, "ext_id": "7696"}, "current_month": "2024-01", "dates": {"first_heard": "2020-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Thurrock Flexible Generation Plant", "name_short": "Thurrock Flexible Generation Plant", "owner": "Thurrock Power", "state": "eastern", "country": "uk", "lat": "51.457726", "long": "0.383815", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.457726+0.383815", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Basing Road", "city": "", "id": "411", "external_id": "7746", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Eco-Economix", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "411", "external_id": "7746", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Basing Road", "external_id": "7746", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Eco-Economix", "status": "planning", "date_first_heard": "2021-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.268813", "long": "-1.062084", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7746", "Record Last Updated (dd/mm/yyyy)": "15/09/2021", "Operator (or Applicant)": "Eco-Economix", "Site Name": "Basing Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land At, Basing Road, Old Basing, Basingstoke, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG24 7AL", "X-coordinate": "465530", "Y-coordinate": "152602", "Planning Authority": "Basingstoke and Deane Borough Council", "Planning Application Reference": "21/02412/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.268813", "long": "-1.062084", "status": "planning", "mw": 20, "ext_id": "7746"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Land At, Basing Road, Old Basing, Basingstoke, Hampshire", "to": "Land At, Basing Road, Old Basing, Basingstoke, ", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Basingstoke and Deane Borough Council", "to": "Basingstoke & Deane Borough Council", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2021", "to": "24/02/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7746", "Record Last Updated (dd/mm/yyyy)": "24/02/2023", "Operator (or Applicant)": "Eco-Economix", "Site Name": "Basing Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At, Basing Road, Old Basing, Basingstoke, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG24 7AL", "X-coordinate": "465530", "Y-coordinate": "152602", "Planning Authority": "Basingstoke & Deane Borough Council", "Planning Application Reference": "21/02412/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.268813", "long": "-1.062084", "status": "planning", "mw": 20, "ext_id": "7746"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Basing Road", "name_short": "Basing Road", "owner": "Eco-Economix", "state": "south east", "country": "uk", "lat": "51.268813", "long": "-1.062084", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.268813+-1.062084", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordtown Energy Storage (Resubmission)", "city": "", "id": "413", "external_id": "7764", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Intelligent Land Investments (ILI)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "413", "external_id": "7764", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordtown Energy Storage ", "external_id": "7764", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 29, "power_mw": 29, "owner": "Intelligent Land Investments (ILI)", "status": "planning", "date_first_heard": "2020-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7764", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Intelligent Land Investments (ILI)", "Site Name": "Fordtown Energy Storage (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "ENQ/2020/0261", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/02/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 29, "ext_id": "7764"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Fordtown, Kintore, Inverurie, Grampian", "to": "Fordtown, Kintore, Inverurie", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Site Name", "from": "Fordtown Energy Storage (Resubmission)", "to": "Fordtown Energy Storage ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "17/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7764", "Record Last Updated (dd/mm/yyyy)": "17/09/2020", "Operator (or Applicant)": "Intelligent Land Investments (ILI)", "Site Name": "Fordtown Energy Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10239", "Are they re-applying (Old REPD Ref) ": "7234", "Address": "Fordtown, Kintore, Inverurie", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "ENQ/2020/0261", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/02/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/03/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 29, "ext_id": "7764"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 29, "mwh_is_estimate": true, "mwh": 29, "mwh_estimate": 29, "status": "planning", "status_class": "", "date_first_heard": "2020-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordtown Energy Storage ", "name_short": "Fordtown Energy Storage ", "owner": "Intelligent Land Investments (ILI)", "state": "scotland", "country": "uk", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.221396+-2.366114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newton Wood Farm", "city": "", "id": "415", "external_id": "7780", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "415", "external_id": "7780", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newton Wood Farm", "external_id": "7780", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco", "status": "planning", "date_first_heard": "2020-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.139091", "long": "-1.321937", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7780", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Newton Wood Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Newton Wood Farm, Newtonwood Lane, Newton, Alfreton, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE55 5SG", "X-coordinate": "445457", "Y-coordinate": "360430", "Planning Authority": "Bolsover District Council", "Planning Application Reference": "20/00202/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.139091", "long": "-1.321937", "status": "planning", "mw": 49, "ext_id": "7780"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/10/2023", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "22/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7780", "Record Last Updated (dd/mm/yyyy)": "22/03/2022", "Operator (or Applicant)": "Anesco", "Site Name": "Newton Wood Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newton Wood Farm, Newtonwood Lane, Newton, Alfreton, Derbyshire", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE55 5SG", "X-coordinate": "445457", "Y-coordinate": "360430", "Planning Authority": "Bolsover District Council", "Planning Application Reference": "20/00202/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.139091", "long": "-1.321937", "status": "planning", "mw": 49, "ext_id": "7780"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newton Wood Farm", "name_short": "Newton Wood Farm", "owner": "Anesco", "state": "east midlands", "country": "uk", "lat": "53.139091", "long": "-1.321937", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.139091+-1.321937", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hawthorne Road", "city": "", "id": "416", "external_id": "7800", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Shaw Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "416", "external_id": "7800", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hawthorne Road", "external_id": "7800", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Bluefield Renewable Developments", "status": "construction", "date_first_heard": "2020-04-14", "start_construction": "2023-02-17", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.459236", "long": "-2.986359", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7800", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Shaw Energy", "Site Name": "Hawthorne Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "491 Linacre Lane, Bootle, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L20 5AL", "X-coordinate": "334606", "Y-coordinate": "396285", "Planning Authority": "Sefton Council", "Planning Application Reference": "DC/2020/00085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/04/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.459236", "long": "-2.986359", "status": "planning", "mw": 40, "ext_id": "7800"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "19/04/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Shaw Energy", "to": "Bluefield Renewable Developments", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "40", "to": "20", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "17/02/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "mw", "from": 40, "to": 20, "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2023", "to": "30/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7800", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Bluefield Renewable Developments", "Site Name": "Hawthorne Road", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "491 Linacre Lane, Bootle, Merseyside", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L20 5AL", "X-coordinate": "334606", "Y-coordinate": "396285", "Planning Authority": "Sefton Council", "Planning Application Reference": "DC/2020/00085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/04/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/04/2023", "Under Construction": "17/02/2023", "Operational": "", "Heat Network Ref": "", "lat": "53.459236", "long": "-2.986359", "status": "construction", "mw": 20, "ext_id": "7800"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "2023-04-19", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-04-14", "start_construction": "2023-02-17", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hawthorne Road", "name_short": "Hawthorne Road", "owner": "Bluefield Renewable Developments", "state": "north west", "country": "uk", "lat": "53.459236", "long": "-2.986359", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.459236+-2.986359", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Titchfield Lane", "city": "", "id": "420", "external_id": "7828", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Balanced Grid Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "420", "external_id": "7828", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Titchfield Lane", "external_id": "7828", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Balanced Grid Solutions", "status": "construction", "date_first_heard": "2020-08-20", "start_construction": "2023-08-20", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.883281", "long": "-1.215524", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7828", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Balanced Grid Solutions", "Site Name": "Titchfield Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land South Of Ash Farm, Titchfield Lane, Wickham, Fareham, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO15 6DY", "X-coordinate": "455282", "Y-coordinate": "109603", "Planning Authority": "Winchester City Council", "Planning Application Reference": "19/02710/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/08/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/08/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.883281", "long": "-1.215524", "status": "planning", "mw": 49, "ext_id": "7828"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "20/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "20/08/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "7828", "Record Last Updated (dd/mm/yyyy)": "20/08/2023", "Operator (or Applicant)": "Balanced Grid Solutions", "Site Name": "Titchfield Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South Of Ash Farm, Titchfield Lane, Wickham, Fareham, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO15 6DY", "X-coordinate": "455282", "Y-coordinate": "109603", "Planning Authority": "Winchester City Council", "Planning Application Reference": "19/02710/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/08/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/08/2023", "Under Construction": "20/08/2023", "Operational": "", "Heat Network Ref": "", "lat": "50.883281", "long": "-1.215524", "status": "construction", "mw": 49, "ext_id": "7828"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "2023-08-20", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-08-20", "start_construction": "2023-08-20", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Titchfield Lane", "name_short": "Titchfield Lane", "owner": "Balanced Grid Solutions", "state": "south east", "country": "uk", "lat": "50.883281", "long": "-1.215524", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.883281+-1.215524", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cleve Hill Solar Project", "city": "", "id": "421", "external_id": "7856", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "421", "external_id": "7856", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cleve Hill Solar Project", "external_id": "7856", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "status": "construction", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.338767", "long": "0.913885", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7856", "Record Last Updated (dd/mm/yyyy)": "02/05/2023", "Operator (or Applicant)": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "Site Name": "Cleve Hill Solar Project", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6502", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Graveney, Whitstable", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME13 9EE", "X-coordinate": "603057", "Y-coordinate": "163995", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/06/2025", "Under Construction": "01/11/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.338767", "long": "0.913885", "status": "construction", "mw": 150, "ext_id": "7856"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/05/2023", "to": "09/06/2022", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/11/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7856", "Record Last Updated (dd/mm/yyyy)": "09/06/2022", "Operator (or Applicant)": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "Site Name": "Cleve Hill Solar Project", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6502", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Graveney, Whitstable", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME13 9EE", "X-coordinate": "603057", "Y-coordinate": "163995", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.338767", "long": "0.913885", "status": "construction", "mw": 150, "ext_id": "7856"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cleve Hill Solar Project", "name_short": "Cleve Hill Solar", "owner": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "state": "south east", "country": "uk", "lat": "51.338767", "long": "0.913885", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.338767+0.913885", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Arecleoch Wind Farm (extension)", "city": "", "id": "422", "external_id": "7882", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "422", "external_id": "7882", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Arecleoch Wind Farm (extension)", "external_id": "7882", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.068785", "long": "-4.797054", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7882", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Arecleoch Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7881", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land 2km south west of Barrhill, South Ayrshire", "County": "South Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26 0PP", "X-coordinate": "221500", "Y-coordinate": "578500", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001864", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.068785", "long": "-4.797054", "status": "planning", "mw": 20, "ext_id": "7882"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2020", "to": "18/11/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/11/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "16/11/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/11/2021", "to": "20/02/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7882", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Arecleoch Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7881", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 2km south west of Barrhill, South Ayrshire", "County": "South Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26 0PP", "X-coordinate": "221500", "Y-coordinate": "578500", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001864", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/06/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/11/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.068785", "long": "-4.797054", "status": "planning", "mw": 20, "ext_id": "7882"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Arecleoch Wind Farm (extension)", "name_short": "Arecleoch Wind Farm (extension)", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "55.068785", "long": "-4.797054", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.068785+-4.797054", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coventry National Grid Substation", "city": "", "id": "423", "external_id": "7885", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "423", "external_id": "7885", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coventry National Grid Substation", "external_id": "7885", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "construction", "date_first_heard": "2021-01-22", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.454379", "long": "-1.464323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7885", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Pivot Power", "Site Name": "Coventry National Grid Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "National Grid Substation, Parrotts Grove, Coventry, West Midlands", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV2 1NQ", "X-coordinate": "436499", "Y-coordinate": "284182", "Planning Authority": "Coventry City Council", "Planning Application Reference": "FUL/2020/1476", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.454379", "long": "-1.464323", "status": "planning", "mw": 49, "ext_id": "7885"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "11/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2022", "to": "25/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7885", "Record Last Updated (dd/mm/yyyy)": "25/06/2020", "Operator (or Applicant)": "Pivot Power", "Site Name": "Coventry National Grid Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Substation, Parrotts Grove, Coventry, West Midlands", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV2 1NQ", "X-coordinate": "436499", "Y-coordinate": "284182", "Planning Authority": "Coventry City Council", "Planning Application Reference": "FUL/2020/1476", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/01/2024", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "52.454379", "long": "-1.464323", "status": "construction", "mw": 49, "ext_id": "7885"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "2022-11-11", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-01-22", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coventry National Grid Substation", "name_short": "Coventry National Grid Substation", "owner": "Pivot Power", "state": "west midlands", "country": "uk", "lat": "52.454379", "long": "-1.464323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.454379+-1.464323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Reach Road", "city": "", "id": "425", "external_id": "7906", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Power Networks", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "425", "external_id": "7906", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Reach Road", "external_id": "7906", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Power Networks", "status": "planning", "date_first_heard": "2020-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.269787", "long": "0.318918", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7906", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "UK Power Networks", "Site Name": "Reach Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Armtrac, 70 Reach Road, Burwell, Cambridge, Cambridgeshire", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0AH", "X-coordinate": "558327", "Y-coordinate": "266047", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "20/00655/SON", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/07/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.269787", "long": "0.318918", "status": "planning", "mw": 49, "ext_id": "7906"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Storage Co-location REPD Ref ID", "from": "", "to": "NA", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "PANR", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7906", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "UK Power Networks", "Site Name": "Reach Road", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "NA", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Armtrac, 70 Reach Road, Burwell, Cambridge, Cambridgeshire", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0AH", "X-coordinate": "558327", "Y-coordinate": "266047", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "20/00655/SON", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/07/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PANR", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.269787", "long": "0.318918", "status": "planning", "mw": 49, "ext_id": "7906"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Reach Road", "name_short": "Reach Road", "owner": "UK Power Networks", "state": "eastern", "country": "uk", "lat": "52.269787", "long": "0.318918", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.269787+0.318918", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Minety Substation", "city": "", "id": "427", "external_id": "7942", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Project", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "427", "external_id": "7942", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Minety Substation", "external_id": "7942", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "JBM Solar Project", "status": "planning", "date_first_heard": "2022-04-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.601478", "long": "-2.007388", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7942", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "JBM Solar Project", "Site Name": "Minety Substation", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7941", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land Near Minety Substation, Stonehill, Charlton, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "399585", "Y-coordinate": "189182", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "20/03528/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.601478", "long": "-2.007388", "status": "planning", "mw": 49, "ext_id": "7942"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "27/04/2022", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "49.90", "to": "10", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land Near Minety Substation, Stonehill, Charlton, Malmesbury, Wiltshire", "to": "Land Near Minety Substation, Stonehill, Charlton, Malmesbury, ", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "07/04/2022", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 49, "to": 10, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "07/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7942", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "JBM Solar Project", "Site Name": "Minety Substation", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7941", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Near Minety Substation, Stonehill, Charlton, Malmesbury, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "399585", "Y-coordinate": "189182", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "20/03528/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.601478", "long": "-2.007388", "status": "planning", "mw": 10, "ext_id": "7942"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2022-04-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Minety Substation", "name_short": "Minety Substation", "owner": "JBM Solar Project", "state": "south west", "country": "uk", "lat": "51.601478", "long": "-2.007388", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.601478+-2.007388", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Unit 5 XL Business Park", "city": "", "id": "428", "external_id": "7985", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Amber Infrastructure Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-18", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "428", "external_id": "7985", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Unit 5 XL Business Park", "external_id": "7985", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Amber Infrastructure Group", "status": "construction", "date_first_heard": "2017-12-18", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.562191", "long": "-2.806931", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7985", "Record Last Updated (dd/mm/yyyy)": "30/07/2021", "Operator (or Applicant)": "Amber Infrastructure Group", "Site Name": "Unit 5 XL Business Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Unit 5, X L Business Park, Statham Road, Skelmersdale, Lancashire", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "WN8 8DY", "X-coordinate": "346649", "Y-coordinate": "407589", "Planning Authority": "West Lancashire Borough Council", "Planning Application Reference": "2017/0968/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/12/2020", "Under Construction": "01/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.562191", "long": "-2.806931", "status": "construction", "mw": 49, "ext_id": "7985"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/07/2021", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7985", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Amber Infrastructure Group", "Site Name": "Unit 5 XL Business Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Unit 5, X L Business Park, Statham Road, Skelmersdale, Lancashire", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "WN8 8DY", "X-coordinate": "346649", "Y-coordinate": "407589", "Planning Authority": "West Lancashire Borough Council", "Planning Application Reference": "2017/0968/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/12/2020", "Under Construction": "01/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.562191", "long": "-2.806931", "status": "construction", "mw": 49, "ext_id": "7985"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-12-18", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Unit 5 XL Business Park", "name_short": "Unit 5 XL Business Park", "owner": "Amber Infrastructure Group", "state": "north west", "country": "uk", "lat": "53.562191", "long": "-2.806931", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.562191+-2.806931", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Perserverance Road (Resubmission)", "city": "", "id": "429", "external_id": "7966", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "429", "external_id": "7966", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Perserverance Road ", "external_id": "7966", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Noriker Power", "status": "planning", "date_first_heard": "2020-11-13", "start_construction": "2022-06-16", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.070788", "long": "-2.714505", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7966", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Noriker Power", "Site Name": "Perserverance Road (Resubmission)", "Technology Type": "Battery", "Storage Type": "Co-located with fossil fuel plant", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "Yes", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Old School Lane, Hereford, Hereford and Worcester", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR4 9BP", "X-coordinate": "351122", "Y-coordinate": "241621", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P200967/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/11/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/11/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.070788", "long": "-2.714505", "status": "planning", "mw": 20, "ext_id": "7966"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "16/06/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Perserverance Road (Resubmission)", "to": "Perserverance Road ", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Co-located with fossil fuel plant", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "Yes", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Old School Lane, Hereford, Hereford and Worcester", "to": "Old School Lane, Hereford, ", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/06/2022", "to": "12/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/06/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/10/2022", "to": "22/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7966", "Record Last Updated (dd/mm/yyyy)": "22/03/2023", "Operator (or Applicant)": "Noriker Power", "Site Name": "Perserverance Road ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7061", "Address": "Old School Lane, Hereford, ", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "HR4 9BP", "X-coordinate": "351122", "Y-coordinate": "241621", "Planning Authority": "Herefordshire Council", "Planning Application Reference": "P200967/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/11/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/11/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.070788", "long": "-2.714505", "status": "planning", "mw": 20, "ext_id": "7966"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "2022-06-16", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2020-11-13", "start_construction": "2022-06-16", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Perserverance Road ", "name_short": "Perserverance Road ", "owner": "Noriker Power", "state": "west midlands", "country": "uk", "lat": "52.070788", "long": "-2.714505", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.070788+-2.714505", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Learielaw Farm", "city": "", "id": "430", "external_id": "7970", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Intelligent Land Investments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "430", "external_id": "7970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Learielaw Farm", "external_id": "7970", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 29, "power_mw": 29, "owner": "Intelligent Land Investments", "status": "planning", "date_first_heard": "2020-10-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.922188", "long": "-3.469178", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7970", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Intelligent Land Investments", "Site Name": "Learielaw Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Learielaw Farm, Broxburn, Lothian", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH52 5PG", "X-coordinate": "308286", "Y-coordinate": "670876", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0600/FUL/20", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.922188", "long": "-3.469178", "status": "planning", "mw": 29, "ext_id": "7970"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "21/06/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/06/2022", "to": "06/03/2023", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/03/2023", "to": "16/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "13368", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7970", "Record Last Updated (dd/mm/yyyy)": "16/11/2022", "Operator (or Applicant)": "Intelligent Land Investments", "Site Name": "Learielaw Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13368", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Learielaw Farm, Broxburn, Lothian", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH52 5PG", "X-coordinate": "308286", "Y-coordinate": "670876", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0600/FUL/20", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.922188", "long": "-3.469178", "status": "planning", "mw": 29, "ext_id": "7970"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 29, "mwh_is_estimate": true, "mwh": 29, "mwh_estimate": 29, "status": "planning", "status_class": "", "date_first_heard": "2020-10-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Learielaw Farm", "name_short": "Learielaw Farm", "owner": "Intelligent Land Investments", "state": "scotland", "country": "uk", "lat": "55.922188", "long": "-3.469178", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.922188+-3.469178", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitehouse Farm Energy Barn", "city": "", "id": "434", "external_id": "7987", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Hedge", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "434", "external_id": "7987", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitehouse Farm Energy Barn", "external_id": "7987", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Bluefield Solar Income Fund", "status": "planning", "date_first_heard": "2017-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.108888", "long": "-2.260957", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7987", "Record Last Updated (dd/mm/yyyy)": "25/08/2020", "Operator (or Applicant)": "Green Hedge", "Site Name": "Whitehouse Farm Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Whitehouse Farm, Blakes Lane, Guarlford, Malvern, Hereford and Worcester", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "WR13 6NZ", "X-coordinate": "382225", "Y-coordinate": "245650", "Planning Authority": "Malvern Hills District Council", "Planning Application Reference": "17/01504/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/11/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.108888", "long": "-2.260957", "status": "planning", "mw": 40, "ext_id": "7987"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/08/2020", "to": "27/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Green Hedge", "to": "Bluefield Solar Income Fund", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Whitehouse Farm, Blakes Lane, Guarlford, Malvern, Hereford and Worcester", "to": "Whitehouse Farm, Blakes Lane, Guarlford, Malvern,", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "29/11/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2022", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7987", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Bluefield Solar Income Fund", "Site Name": "Whitehouse Farm Energy Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Whitehouse Farm, Blakes Lane, Guarlford, Malvern,", "County": "Hereford and Worcester", "Region": "West Midlands", "Country": "England", "Post Code": "WR13 6NZ", "X-coordinate": "382225", "Y-coordinate": "245650", "Planning Authority": "Malvern Hills District Council", "Planning Application Reference": "17/01504/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.108888", "long": "-2.260957", "status": "planning", "mw": 40, "ext_id": "7987"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2017-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whitehouse Farm Energy Barn", "name_short": "Whitehouse Farm Energy Barn", "owner": "Bluefield Solar Income Fund", "state": "west midlands", "country": "uk", "lat": "52.108888", "long": "-2.260957", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.108888+-2.260957", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Catsbrain Farm", "city": "", "id": "435", "external_id": "7988", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Hedge", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "435", "external_id": "7988", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Catsbrain Farm", "external_id": "7988", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Green Hedge", "status": "planning", "date_first_heard": "2017-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.600752", "long": "-1.748629", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7988", "Record Last Updated (dd/mm/yyyy)": "25/08/2020", "Operator (or Applicant)": "Green Hedge", "Site Name": "Catsbrain Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN3", "X-coordinate": "417507", "Y-coordinate": "189131", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/17/0979", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/06/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/11/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.600752", "long": "-1.748629", "status": "planning", "mw": 30, "ext_id": "7988"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/08/2020", "to": "04/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "11787", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, Wiltshire", "to": "N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, ", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/08/2022", "to": "30/06/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7988", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Green Hedge", "Site Name": "Catsbrain Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11787", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN3", "X-coordinate": "417507", "Y-coordinate": "189131", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/17/0979", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/06/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/11/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.600752", "long": "-1.748629", "status": "planning", "mw": 30, "ext_id": "7988"}, "current_month": "2024-01", "dates": {"first_heard": "2020-08-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2017-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Catsbrain Farm", "name_short": "Catsbrain Farm", "owner": "Green Hedge", "state": "south west", "country": "uk", "lat": "51.600752", "long": "-1.748629", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.600752+-1.748629", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Roaring Hill (Resubmission)", "city": "", "id": "436", "external_id": "7989", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "436", "external_id": "7989", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Roaring Hill (Resubmission)", "external_id": "7989", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Renewable Energy Systems (RES)", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.207428", "long": "-3.203344", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7989", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Roaring Hill (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9224", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To East Of Balsillie Avenue And To The South Of The Limekilns Glenrothes", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "325451", "Y-coordinate": "702300", "Planning Authority": "Fife Council", "Planning Application Reference": "17/03318/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.207428", "long": "-3.203344", "status": "planning", "mw": 30, "ext_id": "7989"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "24/01/2023", "extra": "", "change_type": "misc"}, {"name": "Post Code", "from": "", "to": "KY6 3ET", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7989", "Record Last Updated (dd/mm/yyyy)": "24/01/2023", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Roaring Hill (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9224", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To East Of Balsillie Avenue And To The South Of The Limekilns Glenrothes", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY6 3ET", "X-coordinate": "325451", "Y-coordinate": "702300", "Planning Authority": "Fife Council", "Planning Application Reference": "17/03318/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.207428", "long": "-3.203344", "status": "planning", "mw": 30, "ext_id": "7989"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Roaring Hill (Resubmission)", "name_short": "Roaring Hill (Resubmission)", "owner": "Renewable Energy Systems (RES)", "state": "scotland", "country": "uk", "lat": "56.207428", "long": "-3.203344", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.207428+-3.203344", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mill Hill National Grid Substation", "city": "", "id": "437", "external_id": "8009", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "437", "external_id": "8009", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mill Hill National Grid Substation", "external_id": "8009", "state": "london", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harbour Energy", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.617628", "long": "-0.211422", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8009", "Record Last Updated (dd/mm/yyyy)": "21/03/2023", "Operator (or Applicant)": "Harbour Energy", "Site Name": "Mill Hill National Grid Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Mill Hill Substa, Partingdale Lane, Barnet, ", "County": "London", "Region": "London", "Country": "England", "Post Code": "NW7 1NT", "X-coordinate": "523926", "Y-coordinate": "192493", "Planning Authority": "London Borough of Barnet", "Planning Application Reference": "20/4241/FUL", "Appeal Reference": "22/00221/AREF", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "07/04/2022", "Appeal Lodged": "08/08/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "13/03/2023", "Planning Permission Granted": "13/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.617628", "long": "-0.211422", "status": "planning", "mw": 49, "ext_id": "8009"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/03/2023", "to": "27/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8009", "Record Last Updated (dd/mm/yyyy)": "27/03/2023", "Operator (or Applicant)": "Harbour Energy", "Site Name": "Mill Hill National Grid Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Mill Hill Substa, Partingdale Lane, Barnet, ", "County": "London", "Region": "London", "Country": "England", "Post Code": "NW7 1NT", "X-coordinate": "523926", "Y-coordinate": "192493", "Planning Authority": "London Borough of Barnet", "Planning Application Reference": "20/4241/FUL", "Appeal Reference": "22/00221/AREF", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "07/04/2022", "Appeal Lodged": "08/08/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "13/03/2023", "Planning Permission Granted": "13/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.617628", "long": "-0.211422", "status": "planning", "mw": 49, "ext_id": "8009"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mill Hill National Grid Substation", "name_short": "Mill Hill National Grid Substation", "owner": "Harbour Energy", "state": "london", "country": "uk", "lat": "51.617628", "long": "-0.211422", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.617628+-0.211422", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grid Minety Substation", "city": "", "id": "438", "external_id": "8021", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "438", "external_id": "8021", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grid Minety Substation", "external_id": "8021", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harbour Energy", "status": "planning", "date_first_heard": "2021-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.606846", "long": "-1.999013", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8021", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Minety Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "National Grid Minety Substatio, Stonehill, Charlton, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "400165", "Y-coordinate": "189779", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "20/07390/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.606846", "long": "-1.999013", "status": "planning", "mw": 49, "ext_id": "8021"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "22/12/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8021", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Minety Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Minety Substatio, Stonehill, Charlton, Malmesbury, Wiltshire", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "400165", "Y-coordinate": "189779", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "20/07390/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.606846", "long": "-1.999013", "status": "planning", "mw": 49, "ext_id": "8021"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "National Grid Minety Substation", "name_short": "National Grid Minety Substation", "owner": "Harbour Energy", "state": "south west", "country": "uk", "lat": "51.606846", "long": "-1.999013", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.606846+-1.999013", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Colinglen Road Battery", "city": "", "id": "439", "external_id": "8033", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Hannahstown BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "439", "external_id": "8033", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Colinglen Road Battery", "external_id": "8033", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Hannahstown BESS", "status": "planning", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.579463", "long": "-6.03982", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8033", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Hannahstown BESS", "Site Name": "Colinglen Road Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Approximately 700m North Of, 28 Colinglen Road, Dunmurry, Belfast, Co Antrim", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT17 0LR", "X-coordinate": "139044", "Y-coordinate": "527979", "Planning Authority": "Belfast City Council", "Planning Application Reference": "LA04/2020/1724/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.579463", "long": "-6.03982", "status": "planning", "mw": 49, "ext_id": "8033"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "15/08/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8033", "Record Last Updated (dd/mm/yyyy)": "15/08/2022", "Operator (or Applicant)": "Hannahstown BESS", "Site Name": "Colinglen Road Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Approximately 700m North Of, 28 Colinglen Road, Dunmurry, Belfast, Co Antrim", "County": "Co. Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT17 0LR", "X-coordinate": "139044", "Y-coordinate": "527979", "Planning Authority": "Belfast City Council", "Planning Application Reference": "LA04/2020/1724/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.579463", "long": "-6.03982", "status": "planning", "mw": 49, "ext_id": "8033"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Colinglen Road Battery", "name_short": "Colinglen Road Battery", "owner": "Hannahstown BESS", "state": "northern ireland", "country": "uk", "lat": "54.579463", "long": "-6.03982", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.579463+-6.03982", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grid Axminster Substation", "city": "", "id": "440", "external_id": "8036", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "440", "external_id": "8036", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grid Axminster Substation", "external_id": "8036", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harbour Energy", "status": "planning", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.785769", "long": "-2.924556", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8036", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Axminster Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "National Grid Axminster Substa, Pound Road, Hawkchurch, Axminster, Devon", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX13 5UJ", "X-coordinate": "334921", "Y-coordinate": "98874", "Planning Authority": "East Devon District Council", "Planning Application Reference": "20/1877/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.785769", "long": "-2.924556", "status": "planning", "mw": 49, "ext_id": "8036"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8036", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Axminster Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Axminster Substa, Pound Road, Hawkchurch, Axminster, Devon", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX13 5UJ", "X-coordinate": "334921", "Y-coordinate": "98874", "Planning Authority": "East Devon District Council", "Planning Application Reference": "20/1877/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.785769", "long": "-2.924556", "status": "planning", "mw": 49, "ext_id": "8036"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "National Grid Axminster Substation", "name_short": "National Grid Axminster Substation", "owner": "Harbour Energy", "state": "south west", "country": "uk", "lat": "50.785769", "long": "-2.924556", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.785769+-2.924556", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grid Enderby Substation", "city": "", "id": "441", "external_id": "8037", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "441", "external_id": "8037", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grid Enderby Substation", "external_id": "8037", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harbour Energy", "status": "construction", "date_first_heard": "2021-02-04", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.599334", "long": "-1.215904", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8037", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Enderby Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "National Grid Land To North Of, Desford Road, Enderby, Leicester, Leicestershire", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE19 4AD", "X-coordinate": "453205", "Y-coordinate": "300460", "Planning Authority": "Blaby District Council", "Planning Application Reference": "20/0896/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.599334", "long": "-1.215904", "status": "planning", "mw": 49, "ext_id": "8037"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/02/2021", "to": "26/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/09/2022", "to": "25/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/01/2023", "to": "30/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8037", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Harbour Energy", "Site Name": "National Grid Enderby Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "National Grid Land To North Of, Desford Road, Enderby, Leicester, Leicestershire", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE19 4AD", "X-coordinate": "453205", "Y-coordinate": "300460", "Planning Authority": "Blaby District Council", "Planning Application Reference": "20/0896/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/02/2024", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "52.599334", "long": "-1.215904", "status": "construction", "mw": 49, "ext_id": "8037"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-07", "start_construction": "2023-01-25", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-02-04", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "National Grid Enderby Substation", "name_short": "National Grid Enderby Substation", "owner": "Harbour Energy", "state": "east midlands", "country": "uk", "lat": "52.599334", "long": "-1.215904", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.599334+-1.215904", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Moston Vale", "city": "", "id": "442", "external_id": "8085", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Novus Renewable Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-11-24", "start_construction": "2021-07-31", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "442", "external_id": "8085", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Moston Vale", "external_id": "8085", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Novus Renewable Services", "status": "construction", "date_first_heard": "2020-11-24", "start_construction": "2021-07-31", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.505231", "long": "-2.207526", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8085", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "Novus Renewable Services", "Site Name": "Moston Vale", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land To The South West Of, Moston Vale, Manchester, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M40 9GJ", "X-coordinate": "386333", "Y-coordinate": "400969", "Planning Authority": "Manchester City Council", "Planning Application Reference": "127629/FO/2020", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/11/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/11/2023", "Under Construction": "31/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.505231", "long": "-2.207526", "status": "construction", "mw": 10, "ext_id": "8085"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2021", "to": "07/05/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8085", "Record Last Updated (dd/mm/yyyy)": "07/05/2021", "Operator (or Applicant)": "Novus Renewable Services", "Site Name": "Moston Vale", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South West Of, Moston Vale, Manchester, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M40 9GJ", "X-coordinate": "386333", "Y-coordinate": "400969", "Planning Authority": "Manchester City Council", "Planning Application Reference": "127629/FO/2020", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/11/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/11/2023", "Under Construction": "31/07/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.505231", "long": "-2.207526", "status": "construction", "mw": 10, "ext_id": "8085"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-11-24", "start_construction": "2021-07-31", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Moston Vale", "name_short": "Moston Vale", "owner": "Novus Renewable Services", "state": "north west", "country": "uk", "lat": "53.505231", "long": "-2.207526", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.505231+-2.207526", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Welkin Mill", "city": "", "id": "443", "external_id": "8055", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "443", "external_id": "8055", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Welkin Mill", "external_id": "8055", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Noriker Power", "status": "planning", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419541", "long": "-2.134538", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8055", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Noriker Power", "Site Name": "Welkin Mill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391156", "Y-coordinate": "391424", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/077298", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419541", "long": "-2.134538", "status": "planning", "mw": 49, "ext_id": "8055"}, "first_month": "2021-09", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "05/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12982", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7832", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/01/2023", "to": "10/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8055", "Record Last Updated (dd/mm/yyyy)": "10/12/2021", "Operator (or Applicant)": "Noriker Power", "Site Name": "Welkin Mill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12982", "Are they re-applying (Old REPD Ref) ": "7832", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391156", "Y-coordinate": "391424", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/077298", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419541", "long": "-2.134538", "status": "planning", "mw": 49, "ext_id": "8055"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Welkin Mill", "name_short": "Welkin Mill", "owner": "Noriker Power", "state": "north west", "country": "uk", "lat": "53.419541", "long": "-2.134538", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419541+-2.134538", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Loudwater Battery Storage Site", "city": "", "id": "444", "external_id": "8142", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-05-24", "start_construction": "2021-06-10", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "444", "external_id": "8142", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Loudwater Battery Storage Site", "external_id": "8142", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Capbal", "status": "planning", "date_first_heard": "2019-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.611543", "long": "-0.690723", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8142", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Loudwater Battery Storage Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Derehams Farm, Derehams Lane, Loudwater, High Wycombe, Buckinghamshire", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490756", "Y-coordinate": "191113", "Planning Authority": "Wycombe District Council", "Planning Application Reference": "18/07600/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/05/2022", "Under Construction": "10/06/2021", "Operational": "", "Heat Network Ref": "", "lat": "51.611543", "long": "-0.690723", "status": "construction", "mw": 40, "ext_id": "8142"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "30/06/2021", "extra": "", "change_type": "misc"}, {"name": "CHP Enabled", "from": "", "to": "No", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "10/06/2021", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2021", "to": "12/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "11993", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "30/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8142", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Loudwater Battery Storage Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11993", "Are they re-applying (Old REPD Ref) ": "", "Address": "Derehams Farm, Derehams Lane, Loudwater, High Wycombe, Buckinghamshire", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490756", "Y-coordinate": "191113", "Planning Authority": "Wycombe District Council", "Planning Application Reference": "18/07600/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/11/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/05/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/05/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611543", "long": "-0.690723", "status": "planning", "mw": 40, "ext_id": "8142"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2019-05-24", "start_construction": "2021-06-10", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Loudwater Battery Storage Site", "name_short": "Loudwater Battery Storage Site", "owner": "Capbal", "state": "south east", "country": "uk", "lat": "51.611543", "long": "-0.690723", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.611543+-0.690723", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Torrdhuin, Auchteraw Battery Storage Facility", "city": "", "id": "445", "external_id": "8096", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "445", "external_id": "8096", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Torrdhuin, Auchteraw Battery Storage Facility", "external_id": "8096", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.129676", "long": "-4.731558", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8096", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Torrdhuin, Auchteraw Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land 325M SW Of Torrdhuin", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH32 4BT", "X-coordinate": "234761", "Y-coordinate": "807618", "Planning Authority": "Highland Council", "Planning Application Reference": "20/04565/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.129676", "long": "-4.731558", "status": "planning", "mw": 49, "ext_id": "8096"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "04/08/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8096", "Record Last Updated (dd/mm/yyyy)": "04/08/2023", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Torrdhuin, Auchteraw Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 325M SW Of Torrdhuin", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH32 4BT", "X-coordinate": "234761", "Y-coordinate": "807618", "Planning Authority": "Highland Council", "Planning Application Reference": "20/04565/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.129676", "long": "-4.731558", "status": "planning", "mw": 49, "ext_id": "8096"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Torrdhuin, Auchteraw Battery Storage Facility", "name_short": "Torrdhuin, Auchteraw", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "57.129676", "long": "-4.731558", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.129676+-4.731558", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "SHB Hire Ltd", "city": "", "id": "446", "external_id": "8099", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Gerard Hall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "446", "external_id": "8099", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mill Lane, Nursling - Battery Storage Facility", "external_id": "8099", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Gerard Hall Energy", "status": "construction", "date_first_heard": "2020-05-13", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.940857", "long": "-1.493036", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8099", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Gerard Hall Energy", "Site Name": "SHB Hire Ltd", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "SHB Hire Ltd, Mill Lane, Nursling, Southampton, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO16 0YE", "X-coordinate": "435716", "Y-coordinate": "115835", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "19/02772/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/05/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.940857", "long": "-1.493036", "status": "planning", "mw": 20, "ext_id": "8099"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "22/05/2023", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "SHB Hire Ltd", "to": "Mill Lane, Nursling - Battery Storage Facility", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/05/2023", "to": "02/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8099", "Record Last Updated (dd/mm/yyyy)": "02/03/2022", "Operator (or Applicant)": "Gerard Hall Energy", "Site Name": "Mill Lane, Nursling - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SHB Hire Ltd, Mill Lane, Nursling, Southampton, Hampshire", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO16 0YE", "X-coordinate": "435716", "Y-coordinate": "115835", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "19/02772/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/11/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/05/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/05/2023", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "50.940857", "long": "-1.493036", "status": "construction", "mw": 20, "ext_id": "8099"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "2023-05-22", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-05-13", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mill Lane, Nursling - Battery Storage Facility", "name_short": "Mill Lane, Nursling", "owner": "Gerard Hall Energy", "state": "south east", "country": "uk", "lat": "50.940857", "long": "-1.493036", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.940857+-1.493036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackpark Energy Storage (Resubmission)", "city": "", "id": "448", "external_id": "8105", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Shires Hamilton", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "448", "external_id": "8105", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackpark Energy Storage", "external_id": "8105", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Shires Hamilton", "status": "planning", "date_first_heard": "2020-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.572357", "long": "-3.842632", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8105", "Record Last Updated (dd/mm/yyyy)": "22/01/2021", "Operator (or Applicant)": "Shires Hamilton", "Site Name": "Blackpark Energy Storage (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Black Park Farm, Nairn, Highlands", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5HY", "X-coordinate": "289892", "Y-coordinate": "855084", "Planning Authority": "Highland Council", "Planning Application Reference": "20/02589/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.572357", "long": "-3.842632", "status": "planning", "mw": 30, "ext_id": "8105"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Site Name", "from": "Blackpark Energy Storage (Resubmission)", "to": "Blackpark Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Black Park Farm, Nairn, Highlands", "to": "Black Park Farm, Nairn,", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/01/2021", "to": "12/01/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8105", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Shires Hamilton", "Site Name": "Blackpark Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7226", "Address": "Black Park Farm, Nairn,", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5HY", "X-coordinate": "289892", "Y-coordinate": "855084", "Planning Authority": "Highland Council", "Planning Application Reference": "20/02589/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.572357", "long": "-3.842632", "status": "planning", "mw": 30, "ext_id": "8105"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2020-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackpark Energy Storage", "name_short": "Blackpark", "owner": "Shires Hamilton", "state": "scotland", "country": "uk", "lat": "57.572357", "long": "-3.842632", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.572357+-3.842632", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drumcross Battery Storage", "city": "", "id": "449", "external_id": "8155", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Muirhall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "449", "external_id": "8155", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drumcross Battery Storage", "external_id": "8155", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Muirhall Energy", "status": "planning", "date_first_heard": "2018-06-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.888328", "long": "-3.515963", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8155", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Muirhall Energy", "Site Name": "Drumcross Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land West Of Mossbank Cottages Drumcross Bathgate", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "305280", "Y-coordinate": "667171", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0114/FUL/18", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/02/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/06/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/06/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.888328", "long": "-3.515963", "status": "planning", "mw": 49, "ext_id": "8155"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/09/2020", "to": "15/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Installed Capacity (MWelec)", "from": "49.9", "to": "30", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 49, "to": 30, "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2022", "to": "06/12/2023", "extra": "", "change_type": "misc"}, {"name": "Post Code", "from": "", "to": "EH54 6WF", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8155", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Muirhall Energy", "Site Name": "Drumcross Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land West Of Mossbank Cottages Drumcross Bathgate", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH54 6WF", "X-coordinate": "305280", "Y-coordinate": "667171", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0114/FUL/18", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/02/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/06/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/06/2021", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.888328", "long": "-3.515963", "status": "planning", "mw": 30, "ext_id": "8155"}, "current_month": "2024-01", "dates": {"first_heard": "2020-09-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2018-06-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drumcross Battery Storage", "name_short": "Drumcross", "owner": "Muirhall Energy", "state": "scotland", "country": "uk", "lat": "55.888328", "long": "-3.515963", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.888328+-3.515963", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lower Dunton Road Battery Storage Facility", "city": "", "id": "451", "external_id": "8213", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Cedar Tech Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "451", "external_id": "8213", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lower Dunton Road Battery Storage Facility", "external_id": "8213", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 28, "power_mw": 28, "owner": "Cedar Tech Developments Limited", "status": "planning", "date_first_heard": "2021-02-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.56649", "long": "0.39129", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8213", "Record Last Updated (dd/mm/yyyy)": "24/02/2021", "Operator (or Applicant)": "Cedar Tech Developments Limited", "Site Name": "Lower Dunton Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "28.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sub Station, Lower Dunton Road, Basildon", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS16 6EB", "X-coordinate": "565835", "Y-coordinate": "188000", "Planning Authority": "Thurrock Council", "Planning Application Reference": "20/01491/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.56649", "long": "0.39129", "status": "planning", "mw": 28, "ext_id": "8213"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/02/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2021", "to": "11/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8213", "Record Last Updated (dd/mm/yyyy)": "11/01/2022", "Operator (or Applicant)": "Cedar Tech Developments Limited", "Site Name": "Lower Dunton Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "28", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sub Station, Lower Dunton Road, Basildon", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS16 6EB", "X-coordinate": "565835", "Y-coordinate": "188000", "Planning Authority": "Thurrock Council", "Planning Application Reference": "20/01491/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.56649", "long": "0.39129", "status": "planning", "mw": 28, "ext_id": "8213"}, "current_month": "2024-01", "dates": {"first_heard": "2021-02-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 28, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "planning", "status_class": "", "date_first_heard": "2021-02-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lower Dunton Road Battery Storage Facility", "name_short": "Lower Dunton Road", "owner": "Cedar Tech Developments Limited", "state": "eastern", "country": "uk", "lat": "51.56649", "long": "0.39129", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.56649+0.39129", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Three Bridges Solar Farm", "city": "", "id": "452", "external_id": "8220", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "452", "external_id": "8220", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Three Bridges Solar Farm", "external_id": "8220", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Pathfinder Clean Energy UK Dev Limited", "status": "planning", "date_first_heard": "2021-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.714814", "long": "1.048917", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8220", "Record Last Updated (dd/mm/yyyy)": "07/04/2021", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Three Bridges Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8219", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Three Bridges Solar Farm", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR20 3EJ", "X-coordinate": "606037", "Y-coordinate": "317378", "Planning Authority": "Breckland Council", "Planning Application Reference": "3PL/2020/1134/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/03/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.714814", "long": "1.048917", "status": "planning", "mw": 15, "ext_id": "8220"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/04/2021", "to": "07/05/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8220", "Record Last Updated (dd/mm/yyyy)": "07/05/2021", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Three Bridges Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8219", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Three Bridges Solar Farm", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR20 3EJ", "X-coordinate": "606037", "Y-coordinate": "317378", "Planning Authority": "Breckland Council", "Planning Application Reference": "3PL/2020/1134/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/03/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.714814", "long": "1.048917", "status": "planning", "mw": 15, "ext_id": "8220"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2021-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Three Bridges Solar Farm", "name_short": "Three Bridges Solar Farm", "owner": "Pathfinder Clean Energy UK Dev Limited", "state": "eastern", "country": "uk", "lat": "52.714814", "long": "1.048917", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.714814+1.048917", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Platchaig House, Kilmorack - Battery Storage Facility", "city": "", "id": "453", "external_id": "8248", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "453", "external_id": "8248", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Platchaig House, Kilmorack - Battery Storage Facility", "external_id": "8248", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Renewables", "status": "planning", "date_first_heard": "2021-08-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.469701", "long": "-4.507613", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8248", "Record Last Updated (dd/mm/yyyy)": "02/08/2021", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Platchaig House, Kilmorack - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "410m Sw/O Platchaig House", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV4 7AL", "X-coordinate": "249707", "Y-coordinate": "844935", "Planning Authority": "Highland Council", "Planning Application Reference": "21/03353/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.469701", "long": "-4.507613", "status": "planning", "mw": 49, "ext_id": "8248"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/08/2021", "to": "31/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "14373", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Refused", "from": "", "to": "30/08/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8248", "Record Last Updated (dd/mm/yyyy)": "31/07/2023", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Platchaig House, Kilmorack - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14373", "Are they re-applying (Old REPD Ref) ": "", "Address": "410m Sw/O Platchaig House", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV4 7AL", "X-coordinate": "249707", "Y-coordinate": "844935", "Planning Authority": "Highland Council", "Planning Application Reference": "21/03353/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "30/08/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.469701", "long": "-4.507613", "status": "planning", "mw": 49, "ext_id": "8248"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-08-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Platchaig House, Kilmorack - Battery Storage Facility", "name_short": "Platchaig House, Kilmorack", "owner": "Whirlwind Renewables", "state": "scotland", "country": "uk", "lat": "57.469701", "long": "-4.507613", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.469701+-4.507613", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brentwood nergy Storage System", "city": "", "id": "454", "external_id": "8249", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "454", "external_id": "8249", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Brentwood nergy Storage System", "external_id": "8249", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco Limited", "status": "planning", "date_first_heard": "2021-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.640257", "long": "0.361277", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8249", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Brentwood nergy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Hutton Country, Park Wash Road, Hutton", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM13", "X-coordinate": "563490", "Y-coordinate": "196135", "Planning Authority": "Brentwood Borough Council", "Planning Application Reference": "20/01800/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.640257", "long": "0.361277", "status": "planning", "mw": 49, "ext_id": "8249"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "21/05/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "08/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8249", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Brentwood nergy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hutton Country, Park Wash Road, Hutton", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM13", "X-coordinate": "563490", "Y-coordinate": "196135", "Planning Authority": "Brentwood Borough Council", "Planning Application Reference": "20/01800/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/05/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.640257", "long": "0.361277", "status": "planning", "mw": 49, "ext_id": "8249"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Brentwood nergy Storage System", "name_short": "Brentwood nergy Storage System", "owner": "Anesco Limited", "state": "eastern", "country": "uk", "lat": "51.640257", "long": "0.361277", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.640257+0.361277", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newlands Farm Battery Storage Facility Phase 2", "city": "", "id": "455", "external_id": "8264", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "455", "external_id": "8264", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newlands Farm Battery Storage Facility Phase 2", "external_id": "8264", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "British Solar Renewables", "status": "planning", "date_first_heard": "2021-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.83301", "long": "-1.191431", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8264", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Newlands Farm Battery Storage Facility Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Newlands Farm", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO14 1BL", "X-coordinate": "457038", "Y-coordinate": "104031", "Planning Authority": "Fareham Borough Council", "Planning Application Reference": "P/20/1562/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.83301", "long": "-1.191431", "status": "planning", "mw": 40, "ext_id": "8264"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/01/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "26/01/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "18/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8264", "Record Last Updated (dd/mm/yyyy)": "18/03/2022", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Newlands Farm Battery Storage Facility Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newlands Farm", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO14 1BL", "X-coordinate": "457038", "Y-coordinate": "104031", "Planning Authority": "Fareham Borough Council", "Planning Application Reference": "P/20/1562/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.83301", "long": "-1.191431", "status": "planning", "mw": 40, "ext_id": "8264"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2021-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newlands Farm Battery Storage Facility Phase 2", "name_short": "Newlands Farm Battery Storage Facil...", "owner": "British Solar Renewables", "state": "south east", "country": "uk", "lat": "50.83301", "long": "-1.191431", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.83301+-1.191431", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lakeside Energy Storage Facility", "city": "", "id": "456", "external_id": "8268", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Renewable Energy System Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "456", "external_id": "8268", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lakeside Energy Storage Facility", "external_id": "8268", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Tag Energy UK", "status": "planning", "date_first_heard": "2021-05-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.732727", "long": "-0.989589", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8268", "Record Last Updated (dd/mm/yyyy)": "21/05/2021", "Operator (or Applicant)": "Renewable Energy System Limited", "Site Name": "Lakeside Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Off New Road", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FP", "X-coordinate": "466754", "Y-coordinate": "426733", "Planning Authority": "Selby District Council", "Planning Application Reference": "2020/1357/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.732727", "long": "-0.989589", "status": "planning", "mw": 100, "ext_id": "8268"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/05/2021", "to": "21/06/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Renewable Energy System Limited", "to": "Tag Energy UK", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "100.00", "to": "99.9", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 100, "to": 99, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "06/05/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/06/2022", "to": "09/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8268", "Record Last Updated (dd/mm/yyyy)": "09/12/2021", "Operator (or Applicant)": "Tag Energy UK", "Site Name": "Lakeside Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off New Road", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FP", "X-coordinate": "466754", "Y-coordinate": "426733", "Planning Authority": "Selby District Council", "Planning Application Reference": "2020/1357/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/05/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.732727", "long": "-0.989589", "status": "planning", "mw": 99, "ext_id": "8268"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2021-05-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lakeside Energy Storage Facility", "name_short": "Lakeside Energy", "owner": "Tag Energy UK", "state": "yorkshire and humber", "country": "uk", "lat": "53.732727", "long": "-0.989589", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.732727+-0.989589", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Guildford Road Battery Storage Facility", "city": "", "id": "457", "external_id": "8269", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "457", "external_id": "8269", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Guildford Road Battery Storage Facility", "external_id": "8269", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 14, "power_mw": 14, "owner": "Conrad Energy (Developments) Limited", "status": "planning", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.151827", "long": "-0.506714", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8269", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Conrad Energy (Developments) Limited", "Site Name": "Guildford Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "W/O Guildford Road", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "GU6 8PA", "X-coordinate": "504538", "Y-coordinate": "140234", "Planning Authority": "Waverley Borough Council", "Planning Application Reference": "WA/2020/1937", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.151827", "long": "-0.506714", "status": "planning", "mw": 14, "ext_id": "8269"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "24/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8269", "Record Last Updated (dd/mm/yyyy)": "24/03/2023", "Operator (or Applicant)": "Conrad Energy (Developments) Limited", "Site Name": "Guildford Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Guildford Road", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "GU6 8PA", "X-coordinate": "504538", "Y-coordinate": "140234", "Planning Authority": "Waverley Borough Council", "Planning Application Reference": "WA/2020/1937", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/11/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.151827", "long": "-0.506714", "status": "planning", "mw": 14, "ext_id": "8269"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 14, "mwh_is_estimate": true, "mwh": 14, "mwh_estimate": 14, "status": "planning", "status_class": "", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Guildford Road Battery Storage Facility", "name_short": "Guildford Road", "owner": "Conrad Energy (Developments) Limited", "state": "south east", "country": "uk", "lat": "51.151827", "long": "-0.506714", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.151827+-0.506714", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gerrards Cross Sewage Treatment Works", "city": "", "id": "458", "external_id": "8271", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Peak Gen Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "458", "external_id": "8271", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gerrards Cross Sewage Treatment Works", "external_id": "8271", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Peak Gen Power", "status": "planning", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.57847", "long": "-0.531047", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8271", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Peak Gen Power", "Site Name": "Gerrards Cross Sewage Treatment Works", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Gerrards Cross Sewage Treatment Works", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "SL9 7BE", "X-coordinate": "501886", "Y-coordinate": "187645", "Planning Authority": "South Bucks District Council", "Planning Application Reference": "PL/20/4234/FA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.57847", "long": "-0.531047", "status": "planning", "mw": 20, "ext_id": "8271"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8271", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Peak Gen Power", "Site Name": "Gerrards Cross Sewage Treatment Works", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Gerrards Cross Sewage Treatment Works", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "SL9 7BE", "X-coordinate": "501886", "Y-coordinate": "187645", "Planning Authority": "South Bucks District Council", "Planning Application Reference": "PL/20/4234/FA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.57847", "long": "-0.531047", "status": "planning", "mw": 20, "ext_id": "8271"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Gerrards Cross Sewage Treatment Works", "name_short": "Gerrards Cross Sewage Treatment Wor...", "owner": "Peak Gen Power", "state": "south east", "country": "uk", "lat": "51.57847", "long": "-0.531047", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.57847+-0.531047", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cottom Power Station", "city": "", "id": "459", "external_id": "8278", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Thermal Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "459", "external_id": "8278", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cottom Power Station", "external_id": "8278", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "EDF Energy Thermal Generation Limited", "status": "planning", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.303393", "long": "-0.781494", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8278", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "EDF Energy Thermal Generation Limited", "Site Name": "Cottom Power Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Cottam Power Station", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 0EU", "X-coordinate": "481298", "Y-coordinate": "379186", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "20/01288/CTP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.303393", "long": "-0.781494", "status": "planning", "mw": 50, "ext_id": "8278"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8278", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "EDF Energy Thermal Generation Limited", "Site Name": "Cottom Power Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cottam Power Station", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 0EU", "X-coordinate": "481298", "Y-coordinate": "379186", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "20/01288/CTP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.303393", "long": "-0.781494", "status": "planning", "mw": 50, "ext_id": "8278"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cottom Power Station", "name_short": "Cottom Power Station", "owner": "EDF Energy Thermal Generation Limited", "state": "east midlands", "country": "uk", "lat": "53.303393", "long": "-0.781494", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.303393+-0.781494", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Capenhurst Lane", "city": "", "id": "460", "external_id": "8283", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Native River Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "460", "external_id": "8283", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Capenhurst Lane", "external_id": "8283", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Native River Limited", "status": "planning", "date_first_heard": "2021-04-16", "start_construction": "2022-01-24", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.264888", "long": "-2.946107", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8283", "Record Last Updated (dd/mm/yyyy)": "12/01/2021", "Operator (or Applicant)": "Native River Limited", "Site Name": "Capenhurst Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Adj Electricity Substation", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH66 2HD", "X-coordinate": "336992", "Y-coordinate": "374628", "Planning Authority": "", "Planning Application Reference": "20/04767/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.264888", "long": "-2.946107", "status": "planning", "mw": 57, "ext_id": "8283"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2021", "to": "24/01/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "", "to": "Cheshire West and Chester Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/04/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/02/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/01/2022", "to": "15/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/04/2024", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/02/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/07/2022", "to": "25/04/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8283", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Native River Limited", "Site Name": "Capenhurst Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Electricity Substation", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH66 2HD", "X-coordinate": "336992", "Y-coordinate": "374628", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "20/04767/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/04/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.264888", "long": "-2.946107", "status": "planning", "mw": 57, "ext_id": "8283"}, "current_month": "2024-01", "dates": {"first_heard": "2021-01-12", "start_construction": "2022-01-24", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2021-04-16", "start_construction": "2022-01-24", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Capenhurst Lane", "name_short": "Capenhurst Lane", "owner": "Native River Limited", "state": "north west", "country": "uk", "lat": "53.264888", "long": "-2.946107", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.264888+-2.946107", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Park Farm, Herongate Solar Photovoltaic PV Farm", "city": "", "id": "461", "external_id": "8358", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "461", "external_id": "8358", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Crouch Solar Farm", "external_id": "8358", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Low Carbon Storage", "status": "planning", "date_first_heard": "2021-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.590019", "long": "0.376529", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8358", "Record Last Updated (dd/mm/yyyy)": "20/05/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "Park Farm, Herongate Solar Photovoltaic PV Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8357", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Dunton Road", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM13 3SG", "X-coordinate": "564727", "Y-coordinate": "190583", "Planning Authority": "Brentwood Borough Council", "Planning Application Reference": "21/00834/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.590019", "long": "0.376529", "status": "planning", "mw": 49, "ext_id": "8358"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/05/2021", "to": "14/03/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Private Developer", "to": "Low Carbon Storage", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Dunton Road", "to": "Park Farm, Dunton Road, Brentwood", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "23/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "23/12/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2022", "to": "11/07/2023", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Park Farm, Herongate Solar Photovoltaic PV Farm", "to": "Crouch Solar Farm", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8358", "Record Last Updated (dd/mm/yyyy)": "11/07/2023", "Operator (or Applicant)": "Low Carbon Storage", "Site Name": "Crouch Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8357", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Park Farm, Dunton Road, Brentwood", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM13 3SG", "X-coordinate": "564727", "Y-coordinate": "190583", "Planning Authority": "Brentwood Borough Council", "Planning Application Reference": "21/00834/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.590019", "long": "0.376529", "status": "planning", "mw": 49, "ext_id": "8358"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Crouch Solar Farm", "name_short": "Crouch Solar Farm", "owner": "Low Carbon Storage", "state": "eastern", "country": "uk", "lat": "51.590019", "long": "0.376529", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.590019+0.376529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Old Gallows Road - Battery storage", "city": "", "id": "462", "external_id": "8368", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "462", "external_id": "8368", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Old Gallows Road - Battery storage", "external_id": "8368", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Renewables", "status": "planning", "date_first_heard": "2021-08-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.396899", "long": "-3.49004", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8368", "Record Last Updated (dd/mm/yyyy)": "28/04/2021", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Old Gallows Road - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Old Gallows Road", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH1", "X-coordinate": "308124", "Y-coordinate": "723734", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "21/00235/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.396899", "long": "-3.49004", "status": "planning", "mw": 49, "ext_id": "8368"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/04/2021", "to": "08/02/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/08/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8368", "Record Last Updated (dd/mm/yyyy)": "08/02/2021", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Old Gallows Road - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Old Gallows Road", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH1", "X-coordinate": "308124", "Y-coordinate": "723734", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "21/00235/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/08/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.396899", "long": "-3.49004", "status": "planning", "mw": 49, "ext_id": "8368"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-08-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Old Gallows Road - Battery storage", "name_short": "Old Gallows Road", "owner": "Whirlwind Renewables", "state": "scotland", "country": "uk", "lat": "56.396899", "long": "-3.49004", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.396899+-3.49004", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Farburn Place - Energy Storage Facility", "city": "", "id": "463", "external_id": "8385", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Peak Reserve Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "463", "external_id": "8385", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Farburn Place - Energy Storage Facility", "external_id": "8385", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Peak Reserve Power Limited / Centrica / Cragside", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.202831", "long": "-2.191083", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8385", "Record Last Updated (dd/mm/yyyy)": "11/10/2021", "Operator (or Applicant)": "Peak Reserve Power Limited", "Site Name": "Farburn Place - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Place Dyce", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB21 7GP", "X-coordinate": "388554", "Y-coordinate": "812466", "Planning Authority": "Aberdeen City Council", "Planning Application Reference": "210665/DPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.202831", "long": "-2.191083", "status": "planning", "mw": 30, "ext_id": "8385"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "30/09/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/10/2021", "to": "21/12/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Peak Reserve Power Limited", "to": "Peak Reserve Power Limited / Centrica / Cragside", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/12/2022", "to": "08/02/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8385", "Record Last Updated (dd/mm/yyyy)": "08/02/2021", "Operator (or Applicant)": "Peak Reserve Power Limited / Centrica / Cragside", "Site Name": "Farburn Place - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Place Dyce", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB21 7GP", "X-coordinate": "388554", "Y-coordinate": "812466", "Planning Authority": "Aberdeen City Council", "Planning Application Reference": "210665/DPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.202831", "long": "-2.191083", "status": "planning", "mw": 30, "ext_id": "8385"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Farburn Place - Energy Storage Facility", "name_short": "Farburn Place - Energy", "owner": "Peak Reserve Power Limited / Centrica / Cragside", "state": "scotland", "country": "uk", "lat": "57.202831", "long": "-2.191083", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.202831+-2.191083", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane Battery Storage", "city": "", "id": "464", "external_id": "8430", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Walker & Son (Hauliers) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "464", "external_id": "8430", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane Battery Storage", "external_id": "8430", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "Walker & Son (Hauliers) Limited", "status": "planning", "date_first_heard": "2021-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.71833", "long": "-1.275579", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8430", "Record Last Updated (dd/mm/yyyy)": "11/05/2021", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Kirkhaw Lane Knottingley West Yorkshire", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447904", "Y-coordinate": "424901", "Planning Authority": "Wakefield Council", "Planning Application Reference": "21/00180/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.71833", "long": "-1.275579", "status": "planning", "mw": 32, "ext_id": "8430"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/05/2021", "to": "24/02/2022", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Kirkhaw Lane Knottingley West Yorkshire", "to": "Kirkhaw Lane Knottingley ", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2022", "to": "02/03/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8430", "Record Last Updated (dd/mm/yyyy)": "02/03/2021", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited", "Site Name": "Kirkhaw Lane Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10145", "Are they re-applying (Old REPD Ref) ": "7149", "Address": "Kirkhaw Lane Knottingley ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447904", "Y-coordinate": "424901", "Planning Authority": "Wakefield Council", "Planning Application Reference": "21/00180/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.71833", "long": "-1.275579", "status": "planning", "mw": 32, "ext_id": "8430"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "planning", "status_class": "", "date_first_heard": "2021-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane Battery Storage", "name_short": "Kirkhaw Lane", "owner": "Walker & Son (Hauliers) Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.71833", "long": "-1.275579", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.71833+-1.275579", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Minchens Lane Battery Storage Facility", "city": "", "id": "465", "external_id": "8434", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "465", "external_id": "8434", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Minchens Lane Battery Storage Facility", "external_id": "8434", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Penso Power", "status": "planning", "date_first_heard": "2023-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.331436", "long": "-1.066893", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8434", "Record Last Updated (dd/mm/yyyy)": "02/03/2021", "Operator (or Applicant)": "Penso Power", "Site Name": "Minchens Lane Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "OS Ref 464762 159811 Minchens Lane Bramley ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG26", "X-coordinate": "465106", "Y-coordinate": "159562", "Planning Authority": "Basingstoke and Deane Borough Council", "Planning Application Reference": "21/00349/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.331436", "long": "-1.066893", "status": "planning", "mw": 100, "ext_id": "8434"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2021", "to": "03/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Appeal Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Basingstoke and Deane Borough Council", "to": "Basingstoke & Deane Borough Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Refused", "from": "", "to": "08/10/2021", "extra": "", "change_type": "misc"}, {"name": "Appeal Granted", "from": "", "to": "26/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "26/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/02/2023", "to": "21/09/2023", "extra": "", "change_type": "misc"}, {"name": "Appeal Lodged", "from": "", "to": "22/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8434", "Record Last Updated (dd/mm/yyyy)": "21/09/2023", "Operator (or Applicant)": "Penso Power", "Site Name": "Minchens Lane Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "OS Ref 464762 159811 Minchens Lane Bramley ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG26", "X-coordinate": "465106", "Y-coordinate": "159562", "Planning Authority": "Basingstoke & Deane Borough Council", "Planning Application Reference": "21/00349/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "08/10/2021", "Appeal Lodged": "22/12/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "26/01/2023", "Planning Permission Granted": "26/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.331436", "long": "-1.066893", "status": "planning", "mw": 100, "ext_id": "8434"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Minchens Lane Battery Storage Facility", "name_short": "Minchens Lane", "owner": "Penso Power", "state": "south east", "country": "uk", "lat": "51.331436", "long": "-1.066893", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.331436+-1.066893", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "National Grids Rainhill Substation Battery storage facility", "city": "", "id": "466", "external_id": "8439", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Sizing John Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "466", "external_id": "8439", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "National Grids Rainhill Substation Battery storage facility", "external_id": "8439", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Sizing John Limited", "status": "planning", "date_first_heard": "2021-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419678", "long": "-2.738489", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8439", "Record Last Updated (dd/mm/yyyy)": "02/03/2021", "Operator (or Applicant)": "Sizing John Limited", "Site Name": "National Grids Rainhill Substation Battery storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "\ufffdLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens WA9 4QH", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "WA9 4QH", "X-coordinate": "351018", "Y-coordinate": "391685", "Planning Authority": "St Helens Council", "Planning Application Reference": "P/2021/0094/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419678", "long": "-2.738489", "status": "planning", "mw": 57, "ext_id": "8439"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "\ufffdLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens WA9 4QH", "to": "\ufffdLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "07/06/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2021", "to": "21/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "11559", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/10/2022", "to": "02/08/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8439", "Record Last Updated (dd/mm/yyyy)": "02/08/2021", "Operator (or Applicant)": "Sizing John Limited", "Site Name": "National Grids Rainhill Substation Battery storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11559", "Are they re-applying (Old REPD Ref) ": "", "Address": "\ufffdLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens ", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "WA9 4QH", "X-coordinate": "351018", "Y-coordinate": "391685", "Planning Authority": "St Helens Council", "Planning Application Reference": "P/2021/0094/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419678", "long": "-2.738489", "status": "planning", "mw": 57, "ext_id": "8439"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2021-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "National Grids Rainhill Substation Battery storage facility", "name_short": "National Grids Rainhill Substation", "owner": "Sizing John Limited", "state": "north west", "country": "uk", "lat": "53.419678", "long": "-2.738489", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419678+-2.738489", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Trondheim Way Battery energy storage", "city": "", "id": "467", "external_id": "8455", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Burns Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "467", "external_id": "8455", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Trondheim Way Battery energy storage", "external_id": "8455", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Vox Burns Limited", "status": "construction", "date_first_heard": "2021-05-14", "start_construction": "2021-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.606539", "long": "-0.180157", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8455", "Record Last Updated (dd/mm/yyyy)": "24/05/2021", "Operator (or Applicant)": "Vox Burns Limited", "Site Name": "Trondheim Way Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Trondheim Way Stallingborough North East Lincolnshire", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN37 8FD", "X-coordinate": "520507", "Y-coordinate": "413759", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/0120/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.606539", "long": "-0.180157", "status": "planning", "mw": 80, "ext_id": "8455"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2021", "to": "12/01/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Land At Trondheim Way Stallingborough North East Lincolnshire", "to": "Land At Trondheim Way Stallingborough", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/09/2021", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2022", "to": "13/05/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8455", "Record Last Updated (dd/mm/yyyy)": "13/05/2021", "Operator (or Applicant)": "Vox Burns Limited", "Site Name": "Trondheim Way Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Trondheim Way Stallingborough", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN37 8FD", "X-coordinate": "520507", "Y-coordinate": "413759", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/0120/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/09/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.606539", "long": "-0.180157", "status": "construction", "mw": 80, "ext_id": "8455"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-24", "start_construction": "2022-01-12", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-05-14", "start_construction": "2021-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Trondheim Way Battery energy storage", "name_short": "Trondheim Way", "owner": "Vox Burns Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.606539", "long": "-0.180157", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.606539+-0.180157", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bristol Avenue - Battery Energy Storage Facility", "city": "", "id": "469", "external_id": "8809", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Henco International Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "469", "external_id": "8809", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bristol Avenue - Battery Energy Storage Facility", "external_id": "8809", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Henco International Limited", "status": "planning", "date_first_heard": "2021-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.849526", "long": "-3.02841", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8809", "Record Last Updated (dd/mm/yyyy)": "17/05/2021", "Operator (or Applicant)": "Henco International Limited", "Site Name": "Bristol Avenue - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "281 BRISTOL AVENUE, BLACKPOOL, FY2 0JF", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "FY2 0JF", "X-coordinate": "332442", "Y-coordinate": "439745", "Planning Authority": "Blackpool City Council", "Planning Application Reference": "21/0246", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.849526", "long": "-3.02841", "status": "planning", "mw": 25, "ext_id": "8809"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Address", "from": "281 BRISTOL AVENUE, BLACKPOOL, FY2 0JF", "to": "281 BRISTOL AVENUE, BLACKPOOL, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "11/05/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Blackpool City Council", "to": "Blackpool Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8809", "Record Last Updated (dd/mm/yyyy)": "17/05/2021", "Operator (or Applicant)": "Henco International Limited", "Site Name": "Bristol Avenue - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "281 BRISTOL AVENUE, BLACKPOOL, ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "FY2 0JF", "X-coordinate": "332442", "Y-coordinate": "439745", "Planning Authority": "Blackpool Council", "Planning Application Reference": "21/0246", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/05/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/05/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.849526", "long": "-3.02841", "status": "planning", "mw": 25, "ext_id": "8809"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2021-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bristol Avenue - Battery Energy Storage Facility", "name_short": "Bristol Avenue - Battery Energy", "owner": "Henco International Limited", "state": "north west", "country": "uk", "lat": "53.849526", "long": "-3.02841", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.849526+-3.02841", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Howick Hall Farm - Battery Storage Facility", "city": "", "id": "470", "external_id": "8829", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Penwortham Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "470", "external_id": "8829", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Howick Hall Farm - Battery Storage Facility", "external_id": "8829", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Penwortham Storage Limited", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.746291", "long": "-2.750347", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8829", "Record Last Updated (dd/mm/yyyy)": "18/03/2021", "Operator (or Applicant)": "Penwortham Storage Limited", "Site Name": "Howick Hall Farm - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Howick Hall Farm Howick Cross Lane Penwortham Preston Lancashire PR1 0NS", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR1 0NS", "X-coordinate": "350613", "Y-coordinate": "428030", "Planning Authority": "South Ribble Borough Council", "Planning Application Reference": "07/2021/00252/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.746291", "long": "-2.750347", "status": "planning", "mw": 49, "ext_id": "8829"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8829", "Record Last Updated (dd/mm/yyyy)": "18/03/2021", "Operator (or Applicant)": "Penwortham Storage Limited", "Site Name": "Howick Hall Farm - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Howick Hall Farm Howick Cross Lane Penwortham Preston Lancashire PR1 0NS", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR1 0NS", "X-coordinate": "350613", "Y-coordinate": "428030", "Planning Authority": "South Ribble Borough Council", "Planning Application Reference": "07/2021/00252/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.746291", "long": "-2.750347", "status": "planning", "mw": 49, "ext_id": "8829"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Howick Hall Farm - Battery Storage Facility", "name_short": "Howick Hall Farm", "owner": "Penwortham Storage Limited", "state": "north west", "country": "uk", "lat": "53.746291", "long": "-2.750347", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.746291+-2.750347", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holt Road - Battery Energy Storage System", "city": "", "id": "471", "external_id": "8833", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Mannington Energy Centre Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "471", "external_id": "8833", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mannington Battery Energy Storage System", "external_id": "8833", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "EDF Energy Renewables", "status": "construction", "date_first_heard": "2021-06-18", "start_construction": "2022-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.848421", "long": "-1.901823", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8833", "Record Last Updated (dd/mm/yyyy)": "26/03/2021", "Operator (or Applicant)": "Mannington Energy Centre Limited", "Site Name": "Holt Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land off Holt Road", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH21", "X-coordinate": "407008", "Y-coordinate": "105438", "Planning Authority": "East Dorset District Council", "Planning Application Reference": "3/21/0137/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.848421", "long": "-1.901823", "status": "planning", "mw": 49, "ext_id": "8833"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/03/2021", "to": "01/02/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Mannington Energy Centre Limited", "to": "EDF Energy Renewables", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Holt Road - Battery Energy Storage System", "to": "Mannington Battery Energy Storage System", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/06/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/06/2024", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2023", "to": "26/03/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8833", "Record Last Updated (dd/mm/yyyy)": "26/03/2021", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Mannington Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land off Holt Road", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH21", "X-coordinate": "407008", "Y-coordinate": "105438", "Planning Authority": "East Dorset District Council", "Planning Application Reference": "3/21/0137/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/06/2024", "Under Construction": "01/10/2022", "Operational": "", "Heat Network Ref": "", "lat": "50.848421", "long": "-1.901823", "status": "construction", "mw": 49, "ext_id": "8833"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-26", "start_construction": "2023-02-01", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-06-18", "start_construction": "2022-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mannington Battery Energy Storage System", "name_short": "Mannington Battery", "owner": "EDF Energy Renewables", "state": "south west", "country": "uk", "lat": "50.848421", "long": "-1.901823", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.848421+-1.901823", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bolfornought Farm Battery Storage Facility", "city": "", "id": "472", "external_id": "8912", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "472", "external_id": "8912", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bolfornought Farm Battery Storage Facility", "external_id": "8912", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2021-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.120552", "long": "-3.895117", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8912", "Record Last Updated (dd/mm/yyyy)": "27/04/2021", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Bolfornought Farm Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land 650M South West Of Bolfornought Farm Stirling", "County": "Central", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK7 7LL", "X-coordinate": "282277", "Y-coordinate": "693597", "Planning Authority": "Stirling Council", "Planning Application Reference": "21/00293/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.120552", "long": "-3.895117", "status": "planning", "mw": 49, "ext_id": "8912"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "8912", "Record Last Updated (dd/mm/yyyy)": "27/04/2021", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Bolfornought Farm Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 650M South West Of Bolfornought Farm Stirling", "County": "Central", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK7 7LL", "X-coordinate": "282277", "Y-coordinate": "693597", "Planning Authority": "Stirling Council", "Planning Application Reference": "21/00293/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.120552", "long": "-3.895117", "status": "planning", "mw": 49, "ext_id": "8912"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bolfornought Farm Battery Storage Facility", "name_short": "Bolfornought Farm", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "56.120552", "long": "-3.895117", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.120552+-3.895117", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Skelton Battery Storage Facility", "city": "", "id": "473", "external_id": "8914", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Skelton Peak Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "473", "external_id": "8914", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Skelton Grange Battery Storage Facility", "external_id": "8914", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Catalyst Capital LLP", "status": "planning", "date_first_heard": "2021-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.777943", "long": "-1.491189", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8914", "Record Last Updated (dd/mm/yyyy)": "27/04/2021", "Operator (or Applicant)": "Skelton Peak Power Limited", "Site Name": "Skelton Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Former Skelton Grange Power Station Site West Road North Leeds", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS10 1RR", "X-coordinate": "433628", "Y-coordinate": "431410", "Planning Authority": "Leeds City Council", "Planning Application Reference": "21/02628/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.777943", "long": "-1.491189", "status": "planning", "mw": 99, "ext_id": "8914"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2021", "to": "24/01/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Skelton Peak Power Limited", "to": "Catalyst Capital LLP", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Skelton Battery Storage Facility", "to": "Skelton Grange Battery Storage Facility", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "04/08/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "04/08/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8914", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Catalyst Capital LLP", "Site Name": "Skelton Grange Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Skelton Grange Power Station Site West Road North Leeds", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS10 1RR", "X-coordinate": "433628", "Y-coordinate": "431410", "Planning Authority": "Leeds City Council", "Planning Application Reference": "21/02628/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/08/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.777943", "long": "-1.491189", "status": "planning", "mw": 99, "ext_id": "8914"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2021-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Skelton Grange Battery Storage Facility", "name_short": "Skelton Grange", "owner": "Catalyst Capital LLP", "state": "yorkshire and humber", "country": "uk", "lat": "53.777943", "long": "-1.491189", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.777943+-1.491189", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitehills Energy Storage Facility", "city": "", "id": "474", "external_id": "8916", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "474", "external_id": "8916", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitehills Energy Storage Facility", "external_id": "8916", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gigabox Developments Limited / Whirlwind Renewables", "status": "planning", "date_first_heard": "2021-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.653468", "long": "-2.87036", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8916", "Record Last Updated (dd/mm/yyyy)": "20/09/2021", "Operator (or Applicant)": "Gigabox Developments Limited", "Site Name": "Whitehills Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Energy Storage Unit 1 Old Brechin Road Forfar", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD8 3HH", "X-coordinate": "346735", "Y-coordinate": "751635", "Planning Authority": "Angus Council", "Planning Application Reference": "21/00534/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.653468", "long": "-2.87036", "status": "planning", "mw": 49, "ext_id": "8916"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/09/2021", "to": "11/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "15/12/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/03/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Operator (or Applicant)", "from": "Gigabox Developments Limited", "to": "Gigabox Developments Limited / Whirlwind Renewables", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8916", "Record Last Updated (dd/mm/yyyy)": "17/10/2022", "Operator (or Applicant)": "Gigabox Developments Limited / Whirlwind Renewables", "Site Name": "Whitehills Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Energy Storage Unit 1 Old Brechin Road Forfar", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD8 3HH", "X-coordinate": "346735", "Y-coordinate": "751635", "Planning Authority": "Angus Council", "Planning Application Reference": "21/00534/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.653468", "long": "-2.87036", "status": "planning", "mw": 49, "ext_id": "8916"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whitehills Energy Storage Facility", "name_short": "Whitehills Energy", "owner": "Gigabox Developments Limited / Whirlwind Renewables", "state": "scotland", "country": "uk", "lat": "56.653468", "long": "-2.87036", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.653468+-2.87036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dersalloch Battery Storage Facility", "city": "", "id": "475", "external_id": "8927", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables (UK) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "475", "external_id": "8927", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dersalloch Battery Storage Facility", "external_id": "8927", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Scottish Power Renewables (UK) Limited", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.321678", "long": "-4.477597", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8927", "Record Last Updated (dd/mm/yyyy)": "28/04/2021", "Operator (or Applicant)": "Scottish Power Renewables (UK) Limited", "Site Name": "Dersalloch Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Wind Farm At Dersalloch B741 Dalmellington Road Straiton, Council Boundary Straiton, Maybole", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7QA", "X-coordinate": "242893", "Y-coordinate": "605864", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002112", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.321678", "long": "-4.477597", "status": "planning", "mw": 50, "ext_id": "8927"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/04/2021", "to": "22/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/11/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "29/11/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8927", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "Scottish Power Renewables (UK) Limited", "Site Name": "Dersalloch Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wind Farm At Dersalloch B741 Dalmellington Road Straiton, Council Boundary Straiton, Maybole", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7QA", "X-coordinate": "242893", "Y-coordinate": "605864", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002112", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/11/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.321678", "long": "-4.477597", "status": "planning", "mw": 50, "ext_id": "8927"}, "current_month": "2024-01", "dates": {"first_heard": "2021-04-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dersalloch Battery Storage Facility", "name_short": "Dersalloch", "owner": "Scottish Power Renewables (UK) Limited", "state": "scotland", "country": "uk", "lat": "55.321678", "long": "-4.477597", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.321678+-4.477597", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stor Generation Plant - Battery Storage", "city": "", "id": "477", "external_id": "8998", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "477", "external_id": "8998", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stor Generation Plant - Battery Storage", "external_id": "8998", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2021-06-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.795412", "long": "-1.790361", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8998", "Record Last Updated (dd/mm/yyyy)": "10/05/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Stor Generation Plant - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Stor Generation Plant, Duncombe Road, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD8 9TB", "X-coordinate": "413907", "Y-coordinate": "433254", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "21/02041/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.795412", "long": "-1.790361", "status": "planning", "mw": 12, "ext_id": "8998"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/06/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8998", "Record Last Updated (dd/mm/yyyy)": "10/05/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Stor Generation Plant - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stor Generation Plant, Duncombe Road, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD8 9TB", "X-coordinate": "413907", "Y-coordinate": "433254", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "21/02041/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/06/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.795412", "long": "-1.790361", "status": "planning", "mw": 12, "ext_id": "8998"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2021-06-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stor Generation Plant - Battery Storage", "name_short": "Stor Generation Plant", "owner": "Green Frog Power 214 Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.795412", "long": "-1.790361", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.795412+-1.790361", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hull East Stor Generation Compound - Battery energy storage", "city": "", "id": "478", "external_id": "9006", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "478", "external_id": "9006", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hull East Stor Generation Compound - Battery energy storage", "external_id": "9006", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2021-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.749197", "long": "-0.254196", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9006", "Record Last Updated (dd/mm/yyyy)": "12/05/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Hull East Stor Generation Compound - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Hull East Stor Generation Compound, Great Field Lane, Somerden Road, Kingston Upon Hull", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU9 5PE", "X-coordinate": "515219", "Y-coordinate": "429506", "Planning Authority": "Kingston upon Hull City Council", "Planning Application Reference": "21/00631/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/07/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.749197", "long": "-0.254196", "status": "planning", "mw": 20, "ext_id": "9006"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "29/07/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9006", "Record Last Updated (dd/mm/yyyy)": "12/05/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Hull East Stor Generation Compound - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hull East Stor Generation Compound, Great Field Lane, Somerden Road, Kingston Upon Hull", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU9 5PE", "X-coordinate": "515219", "Y-coordinate": "429506", "Planning Authority": "Kingston upon Hull City Council", "Planning Application Reference": "21/00631/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/07/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/07/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.749197", "long": "-0.254196", "status": "planning", "mw": 20, "ext_id": "9006"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hull East Stor Generation Compound - Battery energy storage", "name_short": "Hull East Stor Generation Compound", "owner": "Green Frog Power 214 Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.749197", "long": "-0.254196", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.749197+-0.254196", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kilgallioch - Battery energy storage", "city": "", "id": "479", "external_id": "9007", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Scottish Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "479", "external_id": "9007", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kilgallioch - Battery energy storage", "external_id": "9007", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Scottish Power Renewables", "status": "planning", "date_first_heard": "2021-05-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.234924", "long": "-4.855574", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9007", "Record Last Updated (dd/mm/yyyy)": "12/05/2021", "Operator (or Applicant)": "Scottish Renewables Limited", "Site Name": "Kilgallioch - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Wind Farm, Kilgallioch C72 From Gowlands Terrace, Barrhill To Council Boundary S/O Chirmorrie South From Barrhill, Barrhill, Girvan", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26", "X-coordinate": "218521", "Y-coordinate": "597132", "Planning Authority": "South Ayrshire Council", "Planning Application Reference": "21/00387/DEEM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.234924", "long": "-4.855574", "status": "planning", "mw": 100, "ext_id": "9007"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/05/2021", "to": "18/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Scottish Renewables Limited", "to": "Scottish Power Renewables", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Stand-alone Storage", "to": "Co-located with RE", "extra": "", "change_type": "misc"}, {"name": "Storage Co-location REPD Ref ID", "from": "", "to": "4386", "extra": "", "change_type": "misc"}, {"name": "County", "from": "Strathclyde", "to": "Dumfries and Galloway", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "South Ayrshire Council", "to": "Scottish Government (S36)", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/00387/DEEM", "to": "ECU00002197", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "29/03/2021", "to": "13/01/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9007", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Kilgallioch - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4386", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wind Farm, Kilgallioch C72 From Gowlands Terrace, Barrhill To Council Boundary S/O Chirmorrie South From Barrhill, Barrhill, Girvan", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26", "X-coordinate": "218521", "Y-coordinate": "597132", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002197", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.234924", "long": "-4.855574", "status": "planning", "mw": 100, "ext_id": "9007"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-05-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kilgallioch - Battery energy storage", "name_short": "Kilgallioch", "owner": "Scottish Power Renewables", "state": "scotland", "country": "uk", "lat": "55.234924", "long": "-4.855574", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.234924+-4.855574", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Standby Embedded Stor Power Plant - Battery storage", "city": "", "id": "480", "external_id": "9010", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "480", "external_id": "9010", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Standby Embedded Stor Power Plant - Battery storage", "external_id": "9010", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Green Frog Power 214 Limited", "status": "construction", "date_first_heard": "2021-06-16", "start_construction": "2022-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.003612", "long": "-1.482182", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9010", "Record Last Updated (dd/mm/yyyy)": "21/06/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Standby Embedded Stor Power Plant - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Standby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE29 7UZ", "X-coordinate": "433220", "Y-coordinate": "567794", "Planning Authority": "North Tyneside Council", "Planning Application Reference": "21/01109/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.003612", "long": "-1.482182", "status": "planning", "mw": 20, "ext_id": "9010"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "16/06/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/06/2021", "to": "16/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/10/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9010", "Record Last Updated (dd/mm/yyyy)": "16/01/2023", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Standby Embedded Stor Power Plant - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Standby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE29 7UZ", "X-coordinate": "433220", "Y-coordinate": "567794", "Planning Authority": "North Tyneside Council", "Planning Application Reference": "21/01109/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/06/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/06/2024", "Under Construction": "01/10/2022", "Operational": "", "Heat Network Ref": "", "lat": "55.003612", "long": "-1.482182", "status": "construction", "mw": 20, "ext_id": "9010"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-21", "start_construction": "2023-01-16", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-06-16", "start_construction": "2022-10-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Standby Embedded Stor Power Plant - Battery storage", "name_short": "Standby Embedded Stor Power Plant", "owner": "Green Frog Power 214 Limited", "state": "north east", "country": "uk", "lat": "55.003612", "long": "-1.482182", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.003612+-1.482182", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greens Farm - Battery energy storage", "city": "", "id": "481", "external_id": "9012", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelham Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "481", "external_id": "9012", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Greens Farm - Battery energy storage", "external_id": "9012", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pelham Power Limited", "status": "planning", "date_first_heard": "2021-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.932904", "long": "0.115217", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9012", "Record Last Updated (dd/mm/yyyy)": "13/05/2021", "Operator (or Applicant)": "Pelham Power Limited", "Site Name": "Greens Farm - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Greens Farm, East End, Stocking Pelham, Buntingford", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG9 0JU", "X-coordinate": "545521", "Y-coordinate": "228157", "Planning Authority": "East Hertfordshire District Council", "Planning Application Reference": "3/21/0969/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.932904", "long": "0.115217", "status": "planning", "mw": 49, "ext_id": "9012"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9012", "Record Last Updated (dd/mm/yyyy)": "13/05/2021", "Operator (or Applicant)": "Pelham Power Limited", "Site Name": "Greens Farm - Battery energy storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Greens Farm, East End, Stocking Pelham, Buntingford", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG9 0JU", "X-coordinate": "545521", "Y-coordinate": "228157", "Planning Authority": "East Hertfordshire District Council", "Planning Application Reference": "3/21/0969/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.932904", "long": "0.115217", "status": "planning", "mw": 49, "ext_id": "9012"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Greens Farm - Battery energy storage", "name_short": "Greens Farm", "owner": "Pelham Power Limited", "state": "eastern", "country": "uk", "lat": "51.932904", "long": "0.115217", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.932904+0.115217", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Maiden, Annfield Plain - Energy Storage", "city": "", "id": "482", "external_id": "9036", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "38", "power_mw": "38", "customer": "", "owner": "Stephenson Mohl Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "482", "external_id": "9036", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Maiden, Annfield Plain - Energy Storage", "external_id": "9036", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 38, "power_mw": 38, "owner": "Stephenson Mohl Development", "status": "planning", "date_first_heard": "2021-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.848812", "long": "-1.732319", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9036", "Record Last Updated (dd/mm/yyyy)": "18/05/2021", "Operator (or Applicant)": "Stephenson Mohl Development", "Site Name": "Maiden, Annfield Plain - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "38.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land To The South West Of Morrison Industrial Estate And West Of Lanchester Road Maiden Law", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH9 7XW", "X-coordinate": "417286", "Y-coordinate": "550478", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/21/01583/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.848812", "long": "-1.732319", "status": "planning", "mw": 38, "ext_id": "9036"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2021", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/08/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/12/2021", "to": "28/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9036", "Record Last Updated (dd/mm/yyyy)": "28/07/2022", "Operator (or Applicant)": "Stephenson Mohl Development", "Site Name": "Maiden, Annfield Plain - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "38", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South West Of Morrison Industrial Estate And West Of Lanchester Road Maiden Law", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH9 7XW", "X-coordinate": "417286", "Y-coordinate": "550478", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/21/01583/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.848812", "long": "-1.732319", "status": "planning", "mw": 38, "ext_id": "9036"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 38, "mwh_is_estimate": true, "mwh": 38, "mwh_estimate": 38, "status": "planning", "status_class": "", "date_first_heard": "2021-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Maiden, Annfield Plain - Energy Storage", "name_short": "Maiden, Annfield Plain", "owner": "Stephenson Mohl Development", "state": "north east", "country": "uk", "lat": "54.848812", "long": "-1.732319", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.848812+-1.732319", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "city": "", "id": "483", "external_id": "9046", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Power Initiatives Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "483", "external_id": "9046", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "external_id": "9046", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 22, "power_mw": 22, "owner": "Power Initiatives Limited", "status": "planning", "date_first_heard": "2021-05-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.486707", "long": "-3.544179", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9046", "Record Last Updated (dd/mm/yyyy)": "20/05/2021", "Operator (or Applicant)": "Power Initiatives Limited", "Site Name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "22.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Barton Hill Industrial Park, Barton Hill Way, Torquay", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "TQ2 8JJ", "X-coordinate": "290550", "Y-coordinate": "66350", "Planning Authority": "Torbay Council", "Planning Application Reference": "P/2021/0345", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.486707", "long": "-3.544179", "status": "planning", "mw": 22, "ext_id": "9046"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9046", "Record Last Updated (dd/mm/yyyy)": "20/05/2021", "Operator (or Applicant)": "Power Initiatives Limited", "Site Name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "22.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Barton Hill Industrial Park, Barton Hill Way, Torquay", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "TQ2 8JJ", "X-coordinate": "290550", "Y-coordinate": "66350", "Planning Authority": "Torbay Council", "Planning Application Reference": "P/2021/0345", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.486707", "long": "-3.544179", "status": "planning", "mw": 22, "ext_id": "9046"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 22, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "planning", "status_class": "", "date_first_heard": "2021-05-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "name_short": "Barton Hill Industrial Park - Batte...", "owner": "Power Initiatives Limited", "state": "south west", "country": "uk", "lat": "50.486707", "long": "-3.544179", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.486707+-3.544179", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "city": "", "id": "484", "external_id": "9052", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "484", "external_id": "9052", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "external_id": "9052", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2022-07-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.030255", "long": "-3.054483", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9052", "Record Last Updated (dd/mm/yyyy)": "24/05/2021", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The North Of, National Grid Legacy Substation, Bronwylfa Road, Talwrn", "County": "Clwyd", "Region": "Wales", "Country": "Wales", "Post Code": "LL14 4HY", "X-coordinate": "329379", "Y-coordinate": "348628", "Planning Authority": "Wrexham County Borough Council", "Planning Application Reference": "P/2021/0441", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.030255", "long": "-3.054483", "status": "planning", "mw": 49, "ext_id": "9052"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2021", "to": "27/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "05/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "05/07/2027", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/07/2022", "to": "28/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "13768", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9052", "Record Last Updated (dd/mm/yyyy)": "28/04/2023", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13768", "Are they re-applying (Old REPD Ref) ": "", "Address": "The North Of, National Grid Legacy Substation, Bronwylfa Road, Talwrn", "County": "Clwyd", "Region": "Wales", "Country": "Wales", "Post Code": "LL14 4HY", "X-coordinate": "329379", "Y-coordinate": "348628", "Planning Authority": "Wrexham County Borough Council", "Planning Application Reference": "P/2021/0441", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/07/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.030255", "long": "-3.054483", "status": "planning", "mw": 49, "ext_id": "9052"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-07-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "name_short": "Bronwylfa Road, Talwrn", "owner": "Pelagic Energy", "state": "wales", "country": "uk", "lat": "53.030255", "long": "-3.054483", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.030255+-3.054483", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whaddon Lane, Hilperton", "city": "", "id": "485", "external_id": "9057", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "INRG", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "485", "external_id": "9057", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whaddon Lane, Hilperton", "external_id": "9057", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 18, "power_mw": 18, "owner": "British Solar Renewables", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.34745", "long": "-2.183478", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9057", "Record Last Updated (dd/mm/yyyy)": "24/05/2021", "Operator (or Applicant)": "INRG", "Site Name": "Whaddon Lane, Hilperton", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9056", "Installed Capacity (MWelec)": "18.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "west of Whaddon Farm, Whaddon Lane, Hilperton", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "BA14 6NR", "X-coordinate": "387318", "Y-coordinate": "160946", "Planning Authority": "North Wiltshire District Council", "Planning Application Reference": "PL/2021/03061", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.34745", "long": "-2.183478", "status": "planning", "mw": 18, "ext_id": "9057"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2021", "to": "27/04/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "06/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "29/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "INRG", "to": "British Solar Renewables", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9057", "Record Last Updated (dd/mm/yyyy)": "29/09/2023", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Whaddon Lane, Hilperton", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9056", "Installed Capacity (MWelec)": "18", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "west of Whaddon Farm, Whaddon Lane, Hilperton", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "BA14 6NR", "X-coordinate": "387318", "Y-coordinate": "160946", "Planning Authority": "North Wiltshire District Council", "Planning Application Reference": "PL/2021/03061", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.34745", "long": "-2.183478", "status": "planning", "mw": 18, "ext_id": "9057"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 18, "mwh_is_estimate": true, "mwh": 18, "mwh_estimate": 18, "status": "planning", "status_class": "", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whaddon Lane, Hilperton", "name_short": "Whaddon Lane, Hilperton", "owner": "British Solar Renewables", "state": "south west", "country": "uk", "lat": "51.34745", "long": "-2.183478", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.34745+-2.183478", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Purlieus Farm, Minety - Battery Storage Facility", "city": "", "id": "486", "external_id": "9063", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Minety South 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "486", "external_id": "9063", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Minety South 2 - Battery Storage Facility", "external_id": "9063", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2021-11-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.607952", "long": "-1.99767", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9063", "Record Last Updated (dd/mm/yyyy)": "25/05/2021", "Operator (or Applicant)": "Minety South 2", "Site Name": "Purlieus Farm, Minety - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Purlieus Farm, Minety, Malmesbury", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP", "X-coordinate": "400258", "Y-coordinate": "189902", "Planning Authority": "West Wiltshire District Council", "Planning Application Reference": "PL/2021/04151", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.607952", "long": "-1.99767", "status": "planning", "mw": 49, "ext_id": "9063"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/05/2021", "to": "08/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/11/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Site Name", "from": "Purlieus Farm, Minety - Battery Storage Facility", "to": "Minety South 2 - Battery Storage Facility", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "08/11/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Operator (or Applicant)", "from": "Minety South 2", "to": "Statera Energy", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9063", "Record Last Updated (dd/mm/yyyy)": "08/12/2021", "Operator (or Applicant)": "Statera Energy", "Site Name": "Minety South 2 - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Purlieus Farm, Minety, Malmesbury", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9RP", "X-coordinate": "400258", "Y-coordinate": "189902", "Planning Authority": "West Wiltshire District Council", "Planning Application Reference": "PL/2021/04151", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/11/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.607952", "long": "-1.99767", "status": "planning", "mw": 49, "ext_id": "9063"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-11-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Minety South 2 - Battery Storage Facility", "name_short": "Minety South 2", "owner": "Statera Energy", "state": "south west", "country": "uk", "lat": "51.607952", "long": "-1.99767", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.607952+-1.99767", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dragonhall Farm, Padanaram - Battery Storage", "city": "", "id": "487", "external_id": "9066", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecosse Solar Parks Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "487", "external_id": "9066", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dragonhall Farm, Padanaram - Battery Storage", "external_id": "9066", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Ecosse Solar Parks Limited", "status": "construction", "date_first_heard": "2021-12-02", "start_construction": "2022-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.653902", "long": "-2.939169", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9066", "Record Last Updated (dd/mm/yyyy)": "25/05/2021", "Operator (or Applicant)": "Ecosse Solar Parks Limited", "Site Name": "Dragonhall Farm, Padanaram - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9065", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Field 275M East Of Dragonhall Farm Padanaram Forfar ", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD8", "X-coordinate": "342517", "Y-coordinate": "751739", "Planning Authority": "Angus Council", "Planning Application Reference": "21/00271/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.653902", "long": "-2.939169", "status": "planning", "mw": 10, "ext_id": "9066"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/05/2021", "to": "02/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "02/12/2021", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2022", "to": "30/10/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9066", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Ecosse Solar Parks Limited", "Site Name": "Dragonhall Farm, Padanaram - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9065", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Field 275M East Of Dragonhall Farm Padanaram Forfar ", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD8", "X-coordinate": "342517", "Y-coordinate": "751739", "Planning Authority": "Angus Council", "Planning Application Reference": "21/00271/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/06/2022", "Operational": "", "Heat Network Ref": "", "lat": "56.653902", "long": "-2.939169", "status": "construction", "mw": 10, "ext_id": "9066"}, "current_month": "2024-01", "dates": {"first_heard": "2021-05-25", "start_construction": "2022-03-02", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-12-02", "start_construction": "2022-06-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dragonhall Farm, Padanaram - Battery Storage", "name_short": "Dragonhall Farm, Padanaram", "owner": "Ecosse Solar Parks Limited", "state": "scotland", "country": "uk", "lat": "56.653902", "long": "-2.939169", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.653902+-2.939169", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "488", "external_id": "9115", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "SSE Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "488", "external_id": "9115", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane - Battery Storage Energy", "external_id": "9115", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "SSE Enterprise", "status": "planning", "date_first_heard": "2021-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.721298", "long": "-1.275862", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9115", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "SSE Enterprise", "Site Name": "Kirkhaw Lane - Battery Storage Energy", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Site Within Ferrybridge Power Station", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RB", "X-coordinate": "447882", "Y-coordinate": "425231", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02055/CPL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.721298", "long": "-1.275862", "status": "planning", "mw": 100, "ext_id": "9115"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9115", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "SSE Enterprise", "Site Name": "Kirkhaw Lane - Battery Storage Energy", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10022", "Are they re-applying (Old REPD Ref) ": "", "Address": "Site Within Ferrybridge Power Station", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RB", "X-coordinate": "447882", "Y-coordinate": "425231", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02055/CPL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.721298", "long": "-1.275862", "status": "planning", "mw": 100, "ext_id": "9115"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane - Battery Storage Energy", "name_short": "Kirkhaw Lane - Battery Storage", "owner": "SSE Enterprise", "state": "yorkshire and humber", "country": "uk", "lat": "53.721298", "long": "-1.275862", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.721298+-1.275862", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Daer Wind Farm", "city": "", "id": "490", "external_id": "9127", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "E.ON Climate & Renewables UK Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "490", "external_id": "9127", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Daer Wind Farm", "external_id": "9127", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "E.ON Climate & Renewables UK Developments", "status": "planning", "date_first_heard": "2021-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.337835", "long": "-3.578114", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9127", "Record Last Updated (dd/mm/yyyy)": "10/06/2021", "Operator (or Applicant)": "E.ON Climate & Renewables UK Developments", "Site Name": "Daer Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "2908", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land east of Daer Reservoir, South Lanarkshire/Dumfries and Galloway", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "300000", "Y-coordinate": "606000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "P/21/1014 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.337835", "long": "-3.578114", "status": "planning", "mw": 100, "ext_id": "9127"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Planning Application Reference", "from": "P/21/1014 ", "to": " ECU00000740", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9127", "Record Last Updated (dd/mm/yyyy)": "10/06/2021", "Operator (or Applicant)": "E.ON Climate & Renewables UK Developments", "Site Name": "Daer Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "2908", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land east of Daer Reservoir, South Lanarkshire/Dumfries and Galloway", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "300000", "Y-coordinate": "606000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00000740", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.337835", "long": "-3.578114", "status": "planning", "mw": 100, "ext_id": "9127"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Daer Wind Farm", "name_short": "Daer Wind Farm", "owner": "E.ON Climate & Renewables UK Developments", "state": "scotland", "country": "uk", "lat": "55.337835", "long": "-3.578114", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.337835+-3.578114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bay Gateway - Battery Storage Facility", "city": "", "id": "491", "external_id": "9199", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "491", "external_id": "9199", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bay Gateway - Battery Storage Facility", "external_id": "9199", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Energi Generation", "status": "planning", "date_first_heard": "2022-04-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.043208", "long": "-2.858281", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9199", "Record Last Updated (dd/mm/yyyy)": "16/07/2021", "Operator (or Applicant)": "Energi Generation", "Site Name": "Bay Gateway - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "North Of A683 Bay Gateway Heaton With Oxcliffe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3", "X-coordinate": "343895", "Y-coordinate": "461145", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/00695/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.043208", "long": "-2.858281", "status": "planning", "mw": 99, "ext_id": "9199"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/07/2021", "to": "27/06/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "26/04/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9199", "Record Last Updated (dd/mm/yyyy)": "27/06/2022", "Operator (or Applicant)": "Energi Generation", "Site Name": "Bay Gateway - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North Of A683 Bay Gateway Heaton With Oxcliffe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3", "X-coordinate": "343895", "Y-coordinate": "461145", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/00695/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.043208", "long": "-2.858281", "status": "planning", "mw": 99, "ext_id": "9199"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2022-04-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bay Gateway - Battery Storage Facility", "name_short": "Bay Gateway", "owner": "Energi Generation", "state": "north west", "country": "uk", "lat": "54.043208", "long": "-2.858281", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.043208+-2.858281", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "city": "", "id": "492", "external_id": "9224", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "492", "external_id": "9224", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "external_id": "9224", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Tag Energy UK", "status": "construction", "date_first_heard": "2021-09-03", "start_construction": "2022-09-12", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.207527", "long": "-3.20333", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9224", "Record Last Updated (dd/mm/yyyy)": "25/06/2021", "Operator (or Applicant)": "RES Limited", "Site Name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "E/O Balsillie Avenue, The S/O The Limekilns, Glenrothes", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY12 7DR", "X-coordinate": "325452", "Y-coordinate": "702311", "Planning Authority": "Fife Council", "Planning Application Reference": "21/01438/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.207527", "long": "-3.20333", "status": "planning", "mw": 19, "ext_id": "9224"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/06/2021", "to": "18/11/2021", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "RES Limited", "to": "Tag Energy UK", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "03/09/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/11/2021", "to": "15/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/09/2024", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "12/09/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9224", "Record Last Updated (dd/mm/yyyy)": "15/09/2022", "Operator (or Applicant)": "Tag Energy UK", "Site Name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7989", "Address": "E/O Balsillie Avenue, The S/O The Limekilns, Glenrothes", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY12 7DR", "X-coordinate": "325452", "Y-coordinate": "702311", "Planning Authority": "Fife Council", "Planning Application Reference": "21/01438/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/09/2024", "Under Construction": "12/09/2022", "Operational": "", "Heat Network Ref": "", "lat": "56.207527", "long": "-3.20333", "status": "construction", "mw": 19, "ext_id": "9224"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-25", "start_construction": "2022-09-15", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-09-03", "start_construction": "2022-09-12", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "name_short": "Balsillie Avenue - Roaring Hill Ene...", "owner": "Tag Energy UK", "state": "scotland", "country": "uk", "lat": "56.207527", "long": "-3.20333", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.207527+-3.20333", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Forest Gate - Solar Farm & Battery Storage", "city": "", "id": "493", "external_id": "9230", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "493", "external_id": "9230", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Forest Gate - Solar Farm & Battery Storage", "external_id": "9230", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Eden Renewables", "status": "planning", "date_first_heard": "2023-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.442907", "long": "-2.076784", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9230", "Record Last Updated (dd/mm/yyyy)": "28/06/2021", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Forest Gate - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9229", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Forest Gate, Pewsham, Chippenham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN15 3RS", "X-coordinate": "394760", "Y-coordinate": "171549", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2021/06112", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.442907", "long": "-2.076784", "status": "planning", "mw": 40, "ext_id": "9230"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/06/2021", "to": "14/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "10/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "10/03/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2023", "to": "28/06/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9230", "Record Last Updated (dd/mm/yyyy)": "28/06/2021", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Forest Gate - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9229", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Forest Gate, Pewsham, Chippenham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN15 3RS", "X-coordinate": "394760", "Y-coordinate": "171549", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2021/06112", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.442907", "long": "-2.076784", "status": "planning", "mw": 40, "ext_id": "9230"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Forest Gate - Solar Farm & Battery Storage", "name_short": "Forest Gate - Solar Farm &", "owner": "Eden Renewables", "state": "south west", "country": "uk", "lat": "51.442907", "long": "-2.076784", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.442907+-2.076784", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Leigh Delamere - Solar farm & Battery storage", "city": "", "id": "494", "external_id": "9238", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "494", "external_id": "9238", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Leigh Delamere - Solar farm & Battery storage", "external_id": "9238", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Eden Renewables", "status": "planning", "date_first_heard": "2022-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.508795", "long": "-2.171591", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9238", "Record Last Updated (dd/mm/yyyy)": "29/06/2021", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Leigh Delamere - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9237", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The S/O The M4 At Leigh Delamere, To The W/O Leigh, Delamere Motorway Services, Chippenham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14", "X-coordinate": "388188", "Y-coordinate": "178888", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2021/06100", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.508795", "long": "-2.171591", "status": "planning", "mw": 40, "ext_id": "9238"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/06/2021", "to": "01/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "11/08/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/08/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9238", "Record Last Updated (dd/mm/yyyy)": "01/09/2022", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Leigh Delamere - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9237", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The S/O The M4 At Leigh Delamere, To The W/O Leigh, Delamere Motorway Services, Chippenham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14", "X-coordinate": "388188", "Y-coordinate": "178888", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2021/06100", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.508795", "long": "-2.171591", "status": "planning", "mw": 40, "ext_id": "9238"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Leigh Delamere - Solar farm & Battery storage", "name_short": "Leigh Delamere - Solar farm &", "owner": "Eden Renewables", "state": "south west", "country": "uk", "lat": "51.508795", "long": "-2.171591", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.508795+-2.171591", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Fambridge Hall - Solar farm & Battery storage", "city": "", "id": "495", "external_id": "9274", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "495", "external_id": "9274", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Fambridge Hall - Solar farm & Battery storage", "external_id": "9274", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "British Solar Renewables / BayWa r.e. UK Limited", "status": "planning", "date_first_heard": "2021-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.627529", "long": "0.688668", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9274", "Record Last Updated (dd/mm/yyyy)": "05/07/2021", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "South Fambridge Hall - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9273", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "South Fambridge Hall, Fambridge Road, South Fambridge, Rochford", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS4 3LS", "X-coordinate": "586193", "Y-coordinate": "195503", "Planning Authority": "Rochford District Council", "Planning Application Reference": "21/00605/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.627529", "long": "0.688668", "status": "planning", "mw": 20, "ext_id": "9274"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/07/2021", "to": "22/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2021", "to": "05/08/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "British Solar Renewables", "to": "British Solar Renewables / BayWa r.e. UK Limited", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/12/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/08/2022", "to": "17/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9274", "Record Last Updated (dd/mm/yyyy)": "17/11/2022", "Operator (or Applicant)": "British Solar Renewables / BayWa r.e. UK Limited", "Site Name": "South Fambridge Hall - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9273", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Fambridge Hall, Fambridge Road, South Fambridge, Rochford", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "SS4 3LS", "X-coordinate": "586193", "Y-coordinate": "195503", "Planning Authority": "Rochford District Council", "Planning Application Reference": "21/00605/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.627529", "long": "0.688668", "status": "planning", "mw": 20, "ext_id": "9274"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Fambridge Hall - Solar farm & Battery storage", "name_short": "South Fambridge Hall - Solar farm &", "owner": "British Solar Renewables / BayWa r.e. UK Limited", "state": "eastern", "country": "uk", "lat": "51.627529", "long": "0.688668", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.627529+0.688668", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Weirs Drove, Burwell - Battery Storage Facility", "city": "", "id": "496", "external_id": "9292", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Fen Power 1 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "496", "external_id": "9292", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Weirs Drove, Burwell - Battery Storage Facility", "external_id": "9292", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Fen Power 1 Limited", "status": "planning", "date_first_heard": "2021-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.274443", "long": "0.314426", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9292", "Record Last Updated (dd/mm/yyyy)": "06/07/2021", "Operator (or Applicant)": "Fen Power 1 Limited", "Site Name": "Weirs Drove, Burwell - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land North Of Electricity Sub-Station Weirs Drove Burwell, Cambridge", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0BP", "X-coordinate": "558004", "Y-coordinate": "266555", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "21/00816/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.274443", "long": "0.314426", "status": "planning", "mw": 30, "ext_id": "9292"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9292", "Record Last Updated (dd/mm/yyyy)": "06/07/2021", "Operator (or Applicant)": "Fen Power 1 Limited", "Site Name": "Weirs Drove, Burwell - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7272", "Address": "Land North Of Electricity Sub-Station Weirs Drove Burwell, Cambridge", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 0BP", "X-coordinate": "558004", "Y-coordinate": "266555", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "21/00816/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.274443", "long": "0.314426", "status": "planning", "mw": 30, "ext_id": "9292"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2021-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Weirs Drove, Burwell - Battery Storage Facility", "name_short": "Weirs Drove, Burwell", "owner": "Fen Power 1 Limited", "state": "eastern", "country": "uk", "lat": "52.274443", "long": "0.314426", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.274443+0.314426", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sundon Substation - 49.9MW Battery Storage", "city": "", "id": "497", "external_id": "9315", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "497", "external_id": "9315", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sundon Substation ", "external_id": "9315", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivot Power", "status": "planning", "date_first_heard": "2022-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.931115", "long": "-0.498819", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9315", "Record Last Updated (dd/mm/yyyy)": "16/07/2021", "Operator (or Applicant)": "Pivot Power", "Site Name": "Sundon Substation - 49.9MW Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Adj National Grid Sundon Substation, Water End Lane, Chalton", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ", "X-coordinate": "503312", "Y-coordinate": "226909", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/21/02829/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.931115", "long": "-0.498819", "status": "planning", "mw": 49, "ext_id": "9315"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/07/2021", "to": "30/03/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Sundon Substation - 49.9MW Battery Storage", "to": "Sundon Substation ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/01/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "26/01/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9315", "Record Last Updated (dd/mm/yyyy)": "30/03/2022", "Operator (or Applicant)": "Pivot Power", "Site Name": "Sundon Substation ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7283", "Address": "Adj National Grid Sundon Substation, Water End Lane, Chalton", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ", "X-coordinate": "503312", "Y-coordinate": "226909", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/21/02829/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/01/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.931115", "long": "-0.498819", "status": "planning", "mw": 49, "ext_id": "9315"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-01-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sundon Substation ", "name_short": "Sundon Substation ", "owner": "Pivot Power", "state": "eastern", "country": "uk", "lat": "51.931115", "long": "-0.498819", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.931115+-0.498819", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "city": "", "id": "498", "external_id": "9340", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "P3P Partners LLP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "498", "external_id": "9340", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "external_id": "9340", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "P3P Partners LLP", "status": "planning", "date_first_heard": "2021-07-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.804571", "long": "-2.214196", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9340", "Record Last Updated (dd/mm/yyyy)": "22/07/2021", "Operator (or Applicant)": "P3P Partners LLP", "Site Name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Balderstone Lane, Burnley", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB10 2TJ", "X-coordinate": "385991", "Y-coordinate": "434274", "Planning Authority": "Burnley Borough Council", "Planning Application Reference": "FUL/2021/0375", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.804571", "long": "-2.214196", "status": "planning", "mw": 70, "ext_id": "9340"}, "first_month": "2021-09", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9340", "Record Last Updated (dd/mm/yyyy)": "22/07/2021", "Operator (or Applicant)": "P3P Partners LLP", "Site Name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Balderstone Lane, Burnley", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB10 2TJ", "X-coordinate": "385991", "Y-coordinate": "434274", "Planning Authority": "Burnley Borough Council", "Planning Application Reference": "FUL/2021/0375", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.804571", "long": "-2.214196", "status": "planning", "mw": 70, "ext_id": "9340"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2021-07-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "name_short": "Widow Hill, Balderstone Lane - Batt...", "owner": "P3P Partners LLP", "state": "north west", "country": "uk", "lat": "53.804571", "long": "-2.214196", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.804571+-2.214196", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grendon Lakes - Battery Storage", "city": "", "id": "499", "external_id": "9341", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "499", "external_id": "9341", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grendon Lakes - Battery Storage", "external_id": "9341", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.243607", "long": "-0.723363", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9341", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10955", "Are they re-applying (Old REPD Ref) ": "", "Address": "Grendon Lakes, Main Road, Grendon, Northampton", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW", "X-coordinate": "487263", "Y-coordinate": "261370", "Planning Authority": "North Northamptonshire Council", "Planning Application Reference": "NW/21/00623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "30/09/2021", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.243607", "long": "-0.723363", "status": "planning", "mw": 49, "ext_id": "9341"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9341", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10955", "Are they re-applying (Old REPD Ref) ": "", "Address": "Grendon Lakes, Main Road, Grendon, Northampton", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW", "X-coordinate": "487263", "Y-coordinate": "261370", "Planning Authority": "North Northamptonshire Council", "Planning Application Reference": "NW/21/00623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "30/09/2021", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.243607", "long": "-0.723363", "status": "planning", "mw": 49, "ext_id": "9341"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grendon Lakes - Battery Storage", "name_short": "Grendon Lakes", "owner": "Statera Energy", "state": "east midlands", "country": "uk", "lat": "52.243607", "long": "-0.723363", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.243607+-0.723363", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "city": "", "id": "501", "external_id": "9346", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Namene Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "501", "external_id": "9346", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "external_id": "9346", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Namene Solar", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.761107", "long": "0.398536", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9346", "Record Last Updated (dd/mm/yyyy)": "22/07/2021", "Operator (or Applicant)": "Namene Solar", "Site Name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9345", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Estuary Farm, Edward Benefer Way, Kings Lynn", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE30 2HY", "X-coordinate": "561943", "Y-coordinate": "320864", "Planning Authority": "Borough Council of King\ufffds Lynn & West Norfolk", "Planning Application Reference": "21/01432/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.761107", "long": "0.398536", "status": "planning", "mw": 15, "ext_id": "9346"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/07/2021", "to": "15/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "08/12/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Borough Council of King\ufffds Lynn & West Norfolk", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9346", "Record Last Updated (dd/mm/yyyy)": "15/12/2021", "Operator (or Applicant)": "Namene Solar", "Site Name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9345", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Estuary Farm, Edward Benefer Way, Kings Lynn", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "PE30 2HY", "X-coordinate": "561943", "Y-coordinate": "320864", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "21/01432/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.761107", "long": "0.398536", "status": "planning", "mw": 15, "ext_id": "9346"}, "current_month": "2024-01", "dates": {"first_heard": "2021-07-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "name_short": "Estuary Farm, Edward Benefer Way - ...", "owner": "Namene Solar", "state": "eastern", "country": "uk", "lat": "52.761107", "long": "0.398536", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.761107+0.398536", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Capenhurst Lane, Capenhurst - Battery storage", "city": "", "id": "503", "external_id": "9377", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "HD888CAP Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "503", "external_id": "9377", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Capenhurst Lane, Capenhurst - Battery storage", "external_id": "9377", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "HD888CAP Limited", "status": "construction", "date_first_heard": "2021-10-21", "start_construction": "2022-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.267902", "long": "-2.950312", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9377", "Record Last Updated (dd/mm/yyyy)": "03/08/2021", "Operator (or Applicant)": "HD888CAP Limited", "Site Name": "Capenhurst Lane, Capenhurst - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Capenhurst Lane Capenhurst Chester", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH1 6EH", "X-coordinate": "336716", "Y-coordinate": "374967", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "21/02404/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.267902", "long": "-2.950312", "status": "planning", "mw": 57, "ext_id": "9377"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/08/2021", "to": "15/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/10/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/10/2024", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/09/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9377", "Record Last Updated (dd/mm/yyyy)": "15/09/2022", "Operator (or Applicant)": "HD888CAP Limited", "Site Name": "Capenhurst Lane, Capenhurst - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Capenhurst Lane Capenhurst Chester", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH1 6EH", "X-coordinate": "336716", "Y-coordinate": "374967", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "21/02404/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/10/2024", "Under Construction": "01/09/2022", "Operational": "", "Heat Network Ref": "", "lat": "53.267902", "long": "-2.950312", "status": "construction", "mw": 57, "ext_id": "9377"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-03", "start_construction": "2022-09-15", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-10-21", "start_construction": "2022-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Capenhurst Lane, Capenhurst - Battery storage", "name_short": "Capenhurst Lane, Capenhurst", "owner": "HD888CAP Limited", "state": "north west", "country": "uk", "lat": "53.267902", "long": "-2.950312", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.267902+-2.950312", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stainland Road, Salterhebble - Battery Storage Facility", "city": "", "id": "504", "external_id": "9397", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "North Deane Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "504", "external_id": "9397", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stainland Road, Salterhebble - Battery Storage Facility", "external_id": "9397", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "North Deane Generation Limited", "status": "planning", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.696047", "long": "-1.856009", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9397", "Record Last Updated (dd/mm/yyyy)": "06/08/2021", "Operator (or Applicant)": "North Deane Generation Limited", "Site Name": "Stainland Road, Salterhebble - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "South Of Sub Station Stainland Road Elland Calderdale", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX4 8LR", "X-coordinate": "409605", "Y-coordinate": "422188", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "21/00839/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.696047", "long": "-1.856009", "status": "planning", "mw": 25, "ext_id": "9397"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/08/2021", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/09/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/09/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9397", "Record Last Updated (dd/mm/yyyy)": "13/12/2021", "Operator (or Applicant)": "North Deane Generation Limited", "Site Name": "Stainland Road, Salterhebble - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Sub Station Stainland Road Elland Calderdale", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX4 8LR", "X-coordinate": "409605", "Y-coordinate": "422188", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "21/00839/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.696047", "long": "-1.856009", "status": "planning", "mw": 25, "ext_id": "9397"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stainland Road, Salterhebble - Battery Storage Facility", "name_short": "Stainland Road, Salterhebble", "owner": "North Deane Generation Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.696047", "long": "-1.856009", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.696047+-1.856009", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dunton Hall - Battery Energy Storage System", "city": "", "id": "505", "external_id": "9427", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "Welbar Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "505", "external_id": "9427", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dunton Hall - Battery Energy Storage System", "external_id": "9427", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 349, "power_mw": 349, "owner": "Welbar Energy Storage Limited", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.53587", "long": "-1.715317", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9427", "Record Last Updated (dd/mm/yyyy)": "13/08/2021", "Operator (or Applicant)": "Welbar Energy Storage Limited", "Site Name": "Dunton Hall - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "East & Se/O Dunton Hall, Kingsbury Road, Curdworth, Sutton Coldfield", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B76 0BL", "X-coordinate": "419407", "Y-coordinate": "293150", "Planning Authority": "North Warwickshire Borough Council", "Planning Application Reference": "PAP/2021/0473", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.53587", "long": "-1.715317", "status": "planning", "mw": 349, "ext_id": "9427"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/08/2021", "to": "08/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "04/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/03/2022", "to": "17/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "04/03/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9427", "Record Last Updated (dd/mm/yyyy)": "17/05/2022", "Operator (or Applicant)": "Welbar Energy Storage Limited", "Site Name": "Dunton Hall - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East & Se/O Dunton Hall, Kingsbury Road, Curdworth, Sutton Coldfield", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B76 0BL", "X-coordinate": "419407", "Y-coordinate": "293150", "Planning Authority": "North Warwickshire Borough Council", "Planning Application Reference": "PAP/2021/0473", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.53587", "long": "-1.715317", "status": "planning", "mw": 349, "ext_id": "9427"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 349, "mwh_is_estimate": true, "mwh": 349, "mwh_estimate": 349, "status": "planning", "status_class": "", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dunton Hall - Battery Energy Storage System", "name_short": "Dunton Hall - Battery", "owner": "Welbar Energy Storage Limited", "state": "west midlands", "country": "uk", "lat": "52.53587", "long": "-1.715317", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.53587+-1.715317", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Admiralty Road - Battery Energy Storage Facility", "city": "", "id": "506", "external_id": "9470", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "BAT-NR30 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "506", "external_id": "9470", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Admiralty Road - Battery Energy Storage Facility", "external_id": "9470", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "BAT-NR30 Limited", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.58588", "long": "1.731579", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9470", "Record Last Updated (dd/mm/yyyy)": "23/08/2021", "Operator (or Applicant)": "BAT-NR30 Limited", "Site Name": "Admiralty Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "South & E/o Admiralty Road, South Denes, Great Yarmouth", "County": "Norfolk ", "Region": "Eastern", "Country": "England", "Post Code": "NR30 3QR", "X-coordinate": "652875", "Y-coordinate": "305216", "Planning Authority": "Great Yarmouth Borough Council", "Planning Application Reference": "06/21/0672/LDO", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.58588", "long": "1.731579", "status": "planning", "mw": 49, "ext_id": "9470"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "County", "from": "Norfolk ", "to": "Norfolk", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9470", "Record Last Updated (dd/mm/yyyy)": "23/08/2021", "Operator (or Applicant)": "BAT-NR30 Limited", "Site Name": "Admiralty Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South & E/o Admiralty Road, South Denes, Great Yarmouth", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR30 3QR", "X-coordinate": "652875", "Y-coordinate": "305216", "Planning Authority": "Great Yarmouth Borough Council", "Planning Application Reference": "06/21/0672/LDO", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/08/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.58588", "long": "1.731579", "status": "planning", "mw": 49, "ext_id": "9470"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Admiralty Road - Battery Energy Storage Facility", "name_short": "Admiralty Road - Battery Energy", "owner": "BAT-NR30 Limited", "state": "eastern", "country": "uk", "lat": "52.58588", "long": "1.731579", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.58588+1.731579", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Caldwell Road - Battery Storage", "city": "", "id": "508", "external_id": "9507", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Aura Power BESS Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "508", "external_id": "9507", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Caldwell Road - Battery Storage", "external_id": "9507", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 90, "power_mw": 90, "owner": "Infrared Capital Partners Limited", "status": "planning", "date_first_heard": "2022-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.768556", "long": "-1.626224", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9507", "Record Last Updated (dd/mm/yyyy)": "31/08/2021", "Operator (or Applicant)": "Aura Power BESS Ltd", "Site Name": "Caldwell Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "90.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O The Royle Farm Business Park, Caldwell Road, Burton on Trent", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE15 9TU", "X-coordinate": "425316", "Y-coordinate": "319061", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "DMPA/2021/1221", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.768556", "long": "-1.626224", "status": "planning", "mw": 90, "ext_id": "9507"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/08/2021", "to": "19/04/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "03/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/03/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2022", "to": "04/11/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Aura Power BESS Ltd", "to": "Infrared Capital Partners Limited", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9507", "Record Last Updated (dd/mm/yyyy)": "04/11/2022", "Operator (or Applicant)": "Infrared Capital Partners Limited", "Site Name": "Caldwell Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "90", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O The Royle Farm Business Park, Caldwell Road, Burton on Trent", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE15 9TU", "X-coordinate": "425316", "Y-coordinate": "319061", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "DMPA/2021/1221", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.768556", "long": "-1.626224", "status": "planning", "mw": 90, "ext_id": "9507"}, "current_month": "2024-01", "dates": {"first_heard": "2021-08-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 90, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "planning", "status_class": "", "date_first_heard": "2022-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Caldwell Road - Battery Storage", "name_short": "Caldwell Road", "owner": "Infrared Capital Partners Limited", "state": "east midlands", "country": "uk", "lat": "52.768556", "long": "-1.626224", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.768556+-1.626224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Heysham Energy Storage Project", "city": "", "id": "510", "external_id": "9545", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Kona Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "510", "external_id": "9545", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Heysham Energy Storage Project", "external_id": "9545", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Kona Energy Limited", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.036015", "long": "-2.885953", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9545", "Record Last Updated (dd/mm/yyyy)": "07/09/2021", "Operator (or Applicant)": "Kona Energy Limited", "Site Name": "Heysham Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O A683 Lancaster, Morecambe Bypass, Morecambe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 2FQ", "X-coordinate": "342073", "Y-coordinate": "460367", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/01069/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.036015", "long": "-2.885953", "status": "planning", "mw": 200, "ext_id": "9545"}, "first_month": "2021-09", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/09/2021", "to": "30/05/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "27/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "26/05/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9545", "Record Last Updated (dd/mm/yyyy)": "30/05/2022", "Operator (or Applicant)": "Kona Energy Limited", "Site Name": "Heysham Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O A683 Lancaster, Morecambe Bypass, Morecambe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 2FQ", "X-coordinate": "342073", "Y-coordinate": "460367", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/01069/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.036015", "long": "-2.885953", "status": "planning", "mw": 200, "ext_id": "9545"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Heysham Energy Storage Project", "name_short": "Heysham", "owner": "Kona Energy Limited", "state": "north west", "country": "uk", "lat": "54.036015", "long": "-2.885953", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.036015+-2.885953", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Davies Road - Battery Storage", "city": "", "id": "512", "external_id": "9563", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "512", "external_id": "9563", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Davies Road - Battery Storage", "external_id": "9563", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Energi Generation", "status": "planning", "date_first_heard": "2022-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.753952", "long": "-2.445402", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9563", "Record Last Updated (dd/mm/yyyy)": "09/09/2021", "Operator (or Applicant)": "Energi Generation", "Site Name": "Davies Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Davies Road, Blackburn", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB1 3HR", "X-coordinate": "370729", "Y-coordinate": "428713", "Planning Authority": "Hyndburn Borough Council", "Planning Application Reference": "11/21/0483", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.753952", "long": "-2.445402", "status": "planning", "mw": 25, "ext_id": "9563"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/09/2021", "to": "18/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "17/03/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9563", "Record Last Updated (dd/mm/yyyy)": "18/03/2022", "Operator (or Applicant)": "Energi Generation", "Site Name": "Davies Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Davies Road, Blackburn", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB1 3HR", "X-coordinate": "370729", "Y-coordinate": "428713", "Planning Authority": "Hyndburn Borough Council", "Planning Application Reference": "11/21/0483", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.753952", "long": "-2.445402", "status": "planning", "mw": 25, "ext_id": "9563"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Davies Road - Battery Storage", "name_short": "Davies Road", "owner": "Energi Generation", "state": "north west", "country": "uk", "lat": "53.753952", "long": "-2.445402", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.753952+-2.445402", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "city": "", "id": "513", "external_id": "9565", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Cheshire East Council", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "513", "external_id": "9565", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "external_id": "9565", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Cheshire East Council", "status": "planning", "date_first_heard": "2022-03-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.1122", "long": "-2.416299", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9565", "Record Last Updated (dd/mm/yyyy)": "09/09/2021", "Operator (or Applicant)": "Cheshire East Council", "Site Name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8522", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land Adjacent Councils Composting Plant, Middlewich Road, Crewe", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW1 5NG", "X-coordinate": "372231", "Y-coordinate": "357305", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "21/4490N", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.1122", "long": "-2.416299", "status": "planning", "mw": 25, "ext_id": "9565"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/09/2021", "to": "17/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "11/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "11/03/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9565", "Record Last Updated (dd/mm/yyyy)": "17/03/2022", "Operator (or Applicant)": "Cheshire East Council", "Site Name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8522", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Adjacent Councils Composting Plant, Middlewich Road, Crewe", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW1 5NG", "X-coordinate": "372231", "Y-coordinate": "357305", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "21/4490N", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.1122", "long": "-2.416299", "status": "planning", "mw": 25, "ext_id": "9565"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-03-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "name_short": "Middlewich Road - Solar Photovoltai...", "owner": "Cheshire East Council", "state": "north west", "country": "uk", "lat": "53.1122", "long": "-2.416299", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.1122+-2.416299", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Astra Centre, Royal Barn Road - Energy Storage", "city": "", "id": "514", "external_id": "9584", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Arlington Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "514", "external_id": "9584", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Astra Centre, Royal Barn Road - Energy Storage", "external_id": "9584", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Arlington Energy Limited", "status": "planning", "date_first_heard": "2022-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.596617", "long": "-2.178949", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9584", "Record Last Updated (dd/mm/yyyy)": "13/09/2021", "Operator (or Applicant)": "Arlington Energy Limited", "Site Name": "Astra Centre, Royal Barn Road - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "R/o Astra Centre, Royal Barn Road, Rochdale", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 3DT", "X-coordinate": "388254", "Y-coordinate": "411131", "Planning Authority": "Rochdale borough Council", "Planning Application Reference": "21/01098/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.596617", "long": "-2.178949", "status": "planning", "mw": 40, "ext_id": "9584"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Planning Authority", "from": "Rochdale borough Council", "to": "Rochdale Borough Council", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/09/2021", "to": "24/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "10/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "10/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2022", "to": "05/07/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9584", "Record Last Updated (dd/mm/yyyy)": "05/07/2023", "Operator (or Applicant)": "Arlington Energy Limited", "Site Name": "Astra Centre, Royal Barn Road - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "R/o Astra Centre, Royal Barn Road, Rochdale", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 3DT", "X-coordinate": "388254", "Y-coordinate": "411131", "Planning Authority": "Rochdale Borough Council", "Planning Application Reference": "21/01098/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.596617", "long": "-2.178949", "status": "planning", "mw": 40, "ext_id": "9584"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Astra Centre, Royal Barn Road - Energy Storage", "name_short": "Astra Centre, Royal Barn Road", "owner": "Arlington Energy Limited", "state": "north west", "country": "uk", "lat": "53.596617", "long": "-2.178949", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.596617+-2.178949", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Winterton Road - Battery Energy Storage", "city": "", "id": "515", "external_id": "9608", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "95", "power_mw": "95", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "515", "external_id": "9608", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Winterton Road - Battery Energy Storage", "external_id": "9608", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 95, "power_mw": 95, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2022-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.597192", "long": "-0.64123", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9608", "Record Last Updated (dd/mm/yyyy)": "15/09/2021", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Winterton Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "95.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O Gala Bingo, Winterton Road, Scunthorpe", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN15 0DH", "X-coordinate": "490022", "Y-coordinate": "412038", "Planning Authority": "North Lincolnshire Council", "Planning Application Reference": "PA/2021/1291", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.597192", "long": "-0.64123", "status": "planning", "mw": 95, "ext_id": "9608"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2021", "to": "25/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/12/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/01/2023", "to": "15/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9608", "Record Last Updated (dd/mm/yyyy)": "15/09/2021", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Winterton Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "95", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Gala Bingo, Winterton Road, Scunthorpe", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN15 0DH", "X-coordinate": "490022", "Y-coordinate": "412038", "Planning Authority": "North Lincolnshire Council", "Planning Application Reference": "PA/2021/1291", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.597192", "long": "-0.64123", "status": "planning", "mw": 95, "ext_id": "9608"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 95, "mwh_is_estimate": true, "mwh": 95, "mwh_estimate": 95, "status": "planning", "status_class": "", "date_first_heard": "2022-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Winterton Road - Battery Energy Storage", "name_short": "Winterton Road", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.597192", "long": "-0.64123", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.597192+-0.64123", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bredbury Substation - Battery Storage Facility", "city": "", "id": "517", "external_id": "9653", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "517", "external_id": "9653", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bredbury Substation - Battery Storage Facility", "external_id": "9653", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Private Developer", "status": "construction", "date_first_heard": "2023-02-28", "start_construction": "2023-03-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.413834", "long": "-2.133873", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9653", "Record Last Updated (dd/mm/yyyy)": "20/09/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "Bredbury Substation - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Bredbury Substation, Stockport Road West, Bredbury, Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BP", "X-coordinate": "391199", "Y-coordinate": "390789", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/082085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.413834", "long": "-2.133873", "status": "planning", "mw": 49, "ext_id": "9653"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/09/2021", "to": "11/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/03/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2023", "to": "20/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9653", "Record Last Updated (dd/mm/yyyy)": "20/09/2021", "Operator (or Applicant)": "Private Developer", "Site Name": "Bredbury Substation - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bredbury Substation, Stockport Road West, Bredbury, Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BP", "X-coordinate": "391199", "Y-coordinate": "390789", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/082085", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "01/03/2023", "Operational": "", "Heat Network Ref": "", "lat": "53.413834", "long": "-2.133873", "status": "construction", "mw": 49, "ext_id": "9653"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-20", "start_construction": "2023-04-11", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-02-28", "start_construction": "2023-03-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bredbury Substation - Battery Storage Facility", "name_short": "Bredbury Substation", "owner": "Private Developer", "state": "north west", "country": "uk", "lat": "53.413834", "long": "-2.133873", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.413834+-2.133873", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Brickmakers Arms Battery", "city": "", "id": "518", "external_id": "9668", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "FPC Industry & Enterprise 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "518", "external_id": "9668", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Brickmakers Arms Battery", "external_id": "9668", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "FPC Industry & Enterprise 2 Limited", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.096646", "long": "-0.510744", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9668", "Record Last Updated (dd/mm/yyyy)": "21/09/2021", "Operator (or Applicant)": "FPC Industry & Enterprise 2 Limited", "Site Name": "The Brickmakers Arms Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The Brickmakers Arms Ph Woburn Road, Kempston Hardwick Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK43 9AH", "X-coordinate": "502115", "Y-coordinate": "245302", "Planning Authority": "Bedford Borough Council", "Planning Application Reference": "21/00300/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.096646", "long": "-0.510744", "status": "planning", "mw": 20, "ext_id": "9668"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/09/2021", "to": "05/01/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "22/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "22/12/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9668", "Record Last Updated (dd/mm/yyyy)": "05/01/2022", "Operator (or Applicant)": "FPC Industry & Enterprise 2 Limited", "Site Name": "The Brickmakers Arms Battery", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The Brickmakers Arms Ph Woburn Road, Kempston Hardwick Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK43 9AH", "X-coordinate": "502115", "Y-coordinate": "245302", "Planning Authority": "Bedford Borough Council", "Planning Application Reference": "21/00300/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.096646", "long": "-0.510744", "status": "planning", "mw": 20, "ext_id": "9668"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Brickmakers Arms Battery", "name_short": "The Brickmakers Arms Battery", "owner": "FPC Industry & Enterprise 2 Limited", "state": "eastern", "country": "uk", "lat": "52.096646", "long": "-0.510744", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.096646+-0.510744", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Third Energy UK Gas Limited - Battery Energy Storage", "city": "", "id": "519", "external_id": "9691", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Third Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "519", "external_id": "9691", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Third Energy UK Gas Limited - Battery Energy Storage", "external_id": "9691", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Third Energy", "status": "planning", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.181338", "long": "-0.641704", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9691", "Record Last Updated (dd/mm/yyyy)": "23/09/2021", "Operator (or Applicant)": "Third Energy", "Site Name": "Third Energy UK Gas Limited - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Third Energy Uk Gas Limited, Malton Road, West Knapton, Malton", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO17 8JF", "X-coordinate": "488746", "Y-coordinate": "477025", "Planning Authority": "Ryedale District Council", "Planning Application Reference": "21/01220/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.181338", "long": "-0.641704", "status": "planning", "mw": 100, "ext_id": "9691"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/09/2021", "to": "25/10/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "14/10/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/10/2021", "to": "10/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "14/10/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/05/2022", "to": "27/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/10/2022", "to": "06/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9691", "Record Last Updated (dd/mm/yyyy)": "06/03/2023", "Operator (or Applicant)": "Third Energy", "Site Name": "Third Energy UK Gas Limited - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Third Energy Uk Gas Limited, Malton Road, West Knapton, Malton", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO17 8JF", "X-coordinate": "488746", "Y-coordinate": "477025", "Planning Authority": "Ryedale District Council", "Planning Application Reference": "21/01220/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/10/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/10/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.181338", "long": "-0.641704", "status": "planning", "mw": 100, "ext_id": "9691"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Third Energy UK Gas Limited - Battery Energy Storage", "name_short": "Third Energy UK Gas Limited", "owner": "Third Energy", "state": "yorkshire and humber", "country": "uk", "lat": "54.181338", "long": "-0.641704", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.181338+-0.641704", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)", "city": "", "id": "520", "external_id": "9708", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "520", "external_id": "9708", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tanners Lane - Battery Energy Storage Facility (Phase One)", "external_id": "9708", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "British Solar Renewables", "status": "planning", "date_first_heard": "2019-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.832089", "long": "-1.189601", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9708", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Newlands Farm Tanners Lane Fareham", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO14 1BL", "X-coordinate": "457168", "Y-coordinate": "103930", "Planning Authority": "Fareham Borough Council", "Planning Application Reference": "P/19/1019/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.832089", "long": "-1.189601", "status": "planning", "mw": 40, "ext_id": "9708"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2021", "to": "07/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Site Name", "from": "Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)", "to": "Tanners Lane - Battery Energy Storage Facility (Phase One)", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "26/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9708", "Record Last Updated (dd/mm/yyyy)": "07/04/2022", "Operator (or Applicant)": "British Solar Renewables", "Site Name": "Tanners Lane - Battery Energy Storage Facility (Phase One)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newlands Farm Tanners Lane Fareham", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO14 1BL", "X-coordinate": "457168", "Y-coordinate": "103930", "Planning Authority": "Fareham Borough Council", "Planning Application Reference": "P/19/1019/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.832089", "long": "-1.189601", "status": "planning", "mw": 40, "ext_id": "9708"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2019-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tanners Lane - Battery Energy Storage Facility (Phase One)", "name_short": "Tanners Lane - Battery Energy Stor...", "owner": "British Solar Renewables", "state": "south east", "country": "uk", "lat": "50.832089", "long": "-1.189601", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.832089+-1.189601", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cholmondeley Road - Battery Storage", "city": "", "id": "522", "external_id": "9763", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Riverside Estates (NW) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "522", "external_id": "9763", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cholmondeley Road - Battery Storage", "external_id": "9763", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Riverside Estates (NW) Limited", "status": "planning", "date_first_heard": "2022-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.313681", "long": "-2.714938", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9763", "Record Last Updated (dd/mm/yyyy)": "07/10/2021", "Operator (or Applicant)": "Riverside Estates (NW) Limited", "Site Name": "Cholmondeley Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The South East Of Junction Between Weaver View And Cholmondeley Road Runcorn", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA7 4XU", "X-coordinate": "352465", "Y-coordinate": "379877", "Planning Authority": "Halton Borough Council", "Planning Application Reference": "21/00565/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.313681", "long": "-2.714938", "status": "planning", "mw": 100, "ext_id": "9763"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/10/2021", "to": "15/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "10/08/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "10/08/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9763", "Record Last Updated (dd/mm/yyyy)": "15/08/2022", "Operator (or Applicant)": "Riverside Estates (NW) Limited", "Site Name": "Cholmondeley Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The South East Of Junction Between Weaver View And Cholmondeley Road Runcorn", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA7 4XU", "X-coordinate": "352465", "Y-coordinate": "379877", "Planning Authority": "Halton Borough Council", "Planning Application Reference": "21/00565/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.313681", "long": "-2.714938", "status": "planning", "mw": 100, "ext_id": "9763"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cholmondeley Road - Battery Storage", "name_short": "Cholmondeley Road", "owner": "Riverside Estates (NW) Limited", "state": "north west", "country": "uk", "lat": "53.313681", "long": "-2.714938", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.313681+-2.714938", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stranoch 2", "city": "", "id": "582", "external_id": "7306", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "582", "external_id": "7306", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stranoch 2", "external_id": "7306", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "EDF Energy", "status": "planning", "date_first_heard": "2021-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.999476", "long": "-4.886167", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7306", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "EDF Energy", "Site Name": "Stranoch 2", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6600", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "New Luce, Newton Stewart", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "215493", "Y-coordinate": "571022", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000710", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "54.999476", "long": "-4.886167", "status": "planning", "mw": 20, "ext_id": "7306"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "24/11/2027", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "24/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7306", "Record Last Updated (dd/mm/yyyy)": "24/11/2021", "Operator (or Applicant)": "EDF Energy", "Site Name": "Stranoch 2", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6600", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "4258", "Address": "New Luce, Newton Stewart", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "215493", "Y-coordinate": "571022", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000710", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/11/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.999476", "long": "-4.886167", "status": "planning", "mw": 20, "ext_id": "7306"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stranoch 2", "name_short": "Stranoch 2", "owner": "EDF Energy", "state": "scotland", "country": "uk", "lat": "54.999476", "long": "-4.886167", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.999476+-4.886167", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "city": "", "id": "583", "external_id": "8342", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "583", "external_id": "8342", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "external_id": "8342", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Scottish Power Renewables", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.712239", "long": "-4.343163", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8342", "Record Last Updated (dd/mm/yyyy)": "23/11/2021", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8341", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Eaglesham", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G76", "X-coordinate": "252887", "Y-coordinate": "649022", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "21/0261/PP ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.712239", "long": "-4.343163", "status": "planning", "mw": 50, "ext_id": "8342"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2021", "to": "21/02/2022", "extra": "", "change_type": "misc"}, {"name": "Post Code", "from": "G76", "to": "G76 0QQ", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "East Ayrshire Council", "to": "Scottish Government (S36)", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/0261/PP ", "to": "ECU00002198", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "13/05/2021", "to": "17/04/2021", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Storage Co-location REPD Ref ID", "from": "8341", "to": "8341 & 9076", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/02/2022", "to": "05/02/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8342", "Record Last Updated (dd/mm/yyyy)": "05/02/2021", "Operator (or Applicant)": "Scottish Power Renewables", "Site Name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8341 & 9076", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Eaglesham", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G76 0QQ", "X-coordinate": "252887", "Y-coordinate": "649022", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002198", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.712239", "long": "-4.343163", "status": "planning", "mw": 50, "ext_id": "8342"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "name_short": "Whitelees Hydrogen Production Facil...", "owner": "Scottish Power Renewables", "state": "scotland", "country": "uk", "lat": "55.712239", "long": "-4.343163", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.712239+-4.343163", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rush Green Motors - Battery storage", "city": "", "id": "584", "external_id": "8987", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "584", "external_id": "8987", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rush Green Motors - Battery storage", "external_id": "8987", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RNA Energy limited", "status": "planning", "date_first_heard": "2021-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.89874", "long": "-0.24134", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8987", "Record Last Updated (dd/mm/yyyy)": "25/10/2021", "Operator (or Applicant)": "RNA Energy limited", "Site Name": "Rush Green Motors - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Rush Green Motors, London Road, Langley, Hitchin", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG4 7PQ", "X-coordinate": "521101", "Y-coordinate": "223705", "Planning Authority": "North Hertfordshire District Council", "Planning Application Reference": "21/01860/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/10/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.89874", "long": "-0.24134", "status": "planning", "mw": 49, "ext_id": "8987"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/10/2021", "to": "24/01/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/01/2022", "to": "15/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/10/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/09/2022", "to": "11/10/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8987", "Record Last Updated (dd/mm/yyyy)": "11/10/2023", "Operator (or Applicant)": "RNA Energy limited", "Site Name": "Rush Green Motors - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rush Green Motors, London Road, Langley, Hitchin", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG4 7PQ", "X-coordinate": "521101", "Y-coordinate": "223705", "Planning Authority": "North Hertfordshire District Council", "Planning Application Reference": "21/01860/FP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/10/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/10/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.89874", "long": "-0.24134", "status": "planning", "mw": 49, "ext_id": "8987"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rush Green Motors - Battery storage", "name_short": "Rush Green Motors", "owner": "RNA Energy limited", "state": "eastern", "country": "uk", "lat": "51.89874", "long": "-0.24134", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.89874+-0.24134", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Tawton Primary Substation - Battery Storage", "city": "", "id": "585", "external_id": "9275", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "585", "external_id": "9275", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "North Tawton Primary Substation - Battery Storage", "external_id": "9275", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Balance Power Projects Limited", "status": "planning", "date_first_heard": "2021-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.796767", "long": "-3.912325", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9275", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "North Tawton Primary Substation - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "S/O North Tawton Primary Substation, North Tawton", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX20 2DA", "X-coordinate": "265325", "Y-coordinate": "101433", "Planning Authority": "West Devon Borough Council", "Planning Application Reference": "2094/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.796767", "long": "-3.912325", "status": "planning", "mw": 30, "ext_id": "9275"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/11/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9275", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "North Tawton Primary Substation - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O North Tawton Primary Substation, North Tawton", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX20 2DA", "X-coordinate": "265325", "Y-coordinate": "101433", "Planning Authority": "West Devon Borough Council", "Planning Application Reference": "2094/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/11/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.796767", "long": "-3.912325", "status": "planning", "mw": 30, "ext_id": "9275"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2021-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "North Tawton Primary Substation - Battery Storage", "name_short": "North Tawton Primary Substation", "owner": "Balance Power Projects Limited", "state": "south west", "country": "uk", "lat": "50.796767", "long": "-3.912325", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.796767+-3.912325", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scawby Brook, Brigg - Battery Storage", "city": "", "id": "587", "external_id": "9848", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Centrica Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "587", "external_id": "9848", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Scawby Brook, Brigg - Battery Storage", "external_id": "9848", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Centrica Plc", "status": "planning", "date_first_heard": "2021-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.541003", "long": "-0.505732", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9848", "Record Last Updated (dd/mm/yyyy)": "26/10/2021", "Operator (or Applicant)": "Centrica Plc", "Site Name": "Scawby Brook, Brigg - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Power Station Access Roads To Power Station, Scawby Brook Brigg", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN20 9LT", "X-coordinate": "499120", "Y-coordinate": "405967", "Planning Authority": "North Lincolnshire Council", "Planning Application Reference": "PA/2021/1288", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.541003", "long": "-0.505732", "status": "planning", "mw": 99, "ext_id": "9848"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9848", "Record Last Updated (dd/mm/yyyy)": "26/10/2021", "Operator (or Applicant)": "Centrica Plc", "Site Name": "Scawby Brook, Brigg - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Power Station Access Roads To Power Station, Scawby Brook Brigg", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN20 9LT", "X-coordinate": "499120", "Y-coordinate": "405967", "Planning Authority": "North Lincolnshire Council", "Planning Application Reference": "PA/2021/1288", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.541003", "long": "-0.505732", "status": "planning", "mw": 99, "ext_id": "9848"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2021-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Scawby Brook, Brigg - Battery Storage", "name_short": "Scawby Brook, Brigg", "owner": "Centrica Plc", "state": "yorkshire and humber", "country": "uk", "lat": "53.541003", "long": "-0.505732", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.541003+-0.505732", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ipswich Road, Cardiff - Battery Storage ", "city": "", "id": "589", "external_id": "9910", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "589", "external_id": "9910", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ipswich Road, Cardiff - Battery Storage ", "external_id": "9910", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.498785", "long": "-3.145501", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9910", "Record Last Updated (dd/mm/yyyy)": "11/11/2021", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Ipswich Road, Cardiff - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "First Choice Accident Repair, Ipswich Road, Penylan, Cardiff", "County": "South Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF23 9AQ", "X-coordinate": "320581", "Y-coordinate": "178383", "Planning Authority": "City of Cardiff Council", "Planning Application Reference": "21/02369/MNR", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.498785", "long": "-3.145501", "status": "planning", "mw": 50, "ext_id": "9910"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Planning Authority", "from": "City of Cardiff Council", "to": "Cardiff Council", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2021", "to": "15/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "15610", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9910", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Ipswich Road, Cardiff - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15610", "Are they re-applying (Old REPD Ref) ": "", "Address": "First Choice Accident Repair, Ipswich Road, Penylan, Cardiff", "County": "South Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF23 9AQ", "X-coordinate": "320581", "Y-coordinate": "178383", "Planning Authority": "Cardiff Council", "Planning Application Reference": "21/02369/MNR", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.498785", "long": "-3.145501", "status": "planning", "mw": 50, "ext_id": "9910"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ipswich Road, Cardiff - Battery Storage ", "name_short": "Ipswich Road, Cardiff - Battery Sto...", "owner": "Green Frog Power 214 Limited", "state": "wales", "country": "uk", "lat": "51.498785", "long": "-3.145501", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.498785+-3.145501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Douglas West Wind Farm (extension)", "city": "", "id": "590", "external_id": "9957", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Greencoat UK Wind PLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "590", "external_id": "9957", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Douglas West Wind Farm (extension)", "external_id": "9957", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ScottishPower Renewables (UK) Limited", "status": "planning", "date_first_heard": "2021-11-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.587358", "long": "-3.890104", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9957", "Record Last Updated (dd/mm/yyyy)": "18/11/2021", "Operator (or Applicant)": "Greencoat UK Wind PLC", "Site Name": "Douglas West Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6826", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0NN", "X-coordinate": "280968", "Y-coordinate": "634257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001836", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.587358", "long": "-3.890104", "status": "planning", "mw": 20, "ext_id": "9957"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Operator (or Applicant)", "from": "Greencoat UK Wind PLC", "to": "ScottishPower Renewables (UK) Limited", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde", "to": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark,", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "18/11/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9957", "Record Last Updated (dd/mm/yyyy)": "18/11/2021", "Operator (or Applicant)": "ScottishPower Renewables (UK) Limited", "Site Name": "Douglas West Wind Farm (extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6826", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark,", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0NN", "X-coordinate": "280968", "Y-coordinate": "634257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001836", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/04/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/11/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.587358", "long": "-3.890104", "status": "planning", "mw": 20, "ext_id": "9957"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-11-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Douglas West Wind Farm (extension)", "name_short": "Douglas West Wind Farm (extension)", "owner": "ScottishPower Renewables (UK) Limited", "state": "scotland", "country": "uk", "lat": "55.587358", "long": "-3.890104", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.587358+-3.890104", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barlow Road, Barlow - Battery Storage", "city": "", "id": "592", "external_id": "9970", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "592", "external_id": "9970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barlow Road, Barlow - Battery Storage", "external_id": "9970", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Vox Energy Limited", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9970", "Record Last Updated (dd/mm/yyyy)": "19/11/2021", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Home Farm Barlow Road Barlow ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX ", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/1154/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 50, "ext_id": "9970"}, "first_month": "2021-12", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/11/2021", "to": "28/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "12734", "extra": "", "change_type": "misc"}, {"name": "Planning Application Withdrawn", "from": "", "to": "18/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/11/2022", "to": "19/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9970", "Record Last Updated (dd/mm/yyyy)": "19/11/2021", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12734", "Are they re-applying (Old REPD Ref) ": "", "Address": "Home Farm Barlow Road Barlow ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX ", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/1154/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2021", "Planning Application Withdrawn": "18/10/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 50, "ext_id": "9970"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barlow Road, Barlow - Battery Storage", "name_short": "Barlow Road, Barlow", "owner": "Vox Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.773171+-1.057521", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Northington Lane - Battery Storage Facility", "city": "", "id": "593", "external_id": "9992", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "593", "external_id": "9992", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Northington Lane - Battery Storage Facility", "external_id": "9992", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Green Frog Ventures Limited", "status": "planning", "date_first_heard": "2023-05-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.776361", "long": "-2.434889", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9992", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Green Frog Ventures Limited", "Site Name": "Northington Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Northington Lane, Awre", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL14 1EL", "X-coordinate": "370092", "Y-coordinate": "208722", "Planning Authority": "Forest of Dean District Council", "Planning Application Reference": "P1817/21/FUL", "Appeal Reference": "AP0026/22/REF", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "12/05/2022", "Appeal Lodged": "16/09/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "09/05/2023", "Planning Permission Granted": "09/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.776361", "long": "-2.434889", "status": "planning", "mw": 35, "ext_id": "9992"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2023", "to": "23/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9992", "Record Last Updated (dd/mm/yyyy)": "23/11/2021", "Operator (or Applicant)": "Green Frog Ventures Limited", "Site Name": "Northington Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Northington Lane, Awre", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL14 1EL", "X-coordinate": "370092", "Y-coordinate": "208722", "Planning Authority": "Forest of Dean District Council", "Planning Application Reference": "P1817/21/FUL", "Appeal Reference": "AP0026/22/REF", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "12/05/2022", "Appeal Lodged": "16/09/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "09/05/2023", "Planning Permission Granted": "09/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.776361", "long": "-2.434889", "status": "planning", "mw": 35, "ext_id": "9992"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2023-05-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Northington Lane - Battery Storage Facility", "name_short": "Northington Lane", "owner": "Green Frog Ventures Limited", "state": "south west", "country": "uk", "lat": "51.776361", "long": "-2.434889", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.776361+-2.434889", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sundon Sub Station Battery Storage Facility", "city": "", "id": "594", "external_id": "9998", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Clearstone Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "594", "external_id": "9998", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sundon Sub Station Battery Storage Facility", "external_id": "9998", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Clearstone Energy Limited", "status": "planning", "date_first_heard": "2021-11-10", "start_construction": "2023-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.931246", "long": "-0.504851", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9998", "Record Last Updated (dd/mm/yyyy)": "24/11/2021", "Operator (or Applicant)": "Clearstone Energy Limited", "Site Name": "Sundon Sub Station Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Sundon Sub-Station, Chalton, Luton", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UQ", "X-coordinate": "502897", "Y-coordinate": "226915", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/21/02107/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.931246", "long": "-0.504851", "status": "planning", "mw": 50, "ext_id": "9998"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "10/11/2024", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/11/2021", "to": "08/11/2023", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9998", "Record Last Updated (dd/mm/yyyy)": "08/11/2023", "Operator (or Applicant)": "Clearstone Energy Limited", "Site Name": "Sundon Sub Station Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sundon Sub-Station, Chalton, Luton", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UQ", "X-coordinate": "502897", "Y-coordinate": "226915", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/21/02107/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/11/2024", "Under Construction": "01/07/2023", "Operational": "", "Heat Network Ref": "", "lat": "51.931246", "long": "-0.504851", "status": "planning", "mw": 50, "ext_id": "9998"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2021-11-10", "start_construction": "2023-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sundon Sub Station Battery Storage Facility", "name_short": "Sundon Sub Station", "owner": "Clearstone Energy Limited", "state": "eastern", "country": "uk", "lat": "51.931246", "long": "-0.504851", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.931246+-0.504851", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mount Road, Castle Gresley - Battery Storage Facility", "city": "", "id": "595", "external_id": "10012", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Flexion Energy UK Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "595", "external_id": "10012", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mount Road, Castle Gresley - Battery Storage Facility", "external_id": "10012", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Flexion Energy UK Storage Limited", "status": "planning", "date_first_heard": "2022-07-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.758117", "long": "-1.592736", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10012", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "Flexion Energy UK Storage Limited", "Site Name": "Mount Road, Castle Gresley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Mount Road Castle Gresley", "County": "South Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE11 9ES", "X-coordinate": "427582", "Y-coordinate": "317912", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "DMPA/2021/1698", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.758117", "long": "-1.592736", "status": "planning", "mw": 20, "ext_id": "10012"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/11/2021", "to": "18/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/07/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/08/2022", "to": "29/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10012", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "Flexion Energy UK Storage Limited", "Site Name": "Mount Road, Castle Gresley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Mount Road Castle Gresley", "County": "South Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE11 9ES", "X-coordinate": "427582", "Y-coordinate": "317912", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "DMPA/2021/1698", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.758117", "long": "-1.592736", "status": "planning", "mw": 20, "ext_id": "10012"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-07-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mount Road, Castle Gresley - Battery Storage Facility", "name_short": "Mount Road, Castle Gresley", "owner": "Flexion Energy UK Storage Limited", "state": "east midlands", "country": "uk", "lat": "52.758117", "long": "-1.592736", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.758117+-1.592736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cellarhead - Battery Site", "city": "", "id": "596", "external_id": "10013", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "C&S Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "596", "external_id": "10013", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cellarhead - Battery Site", "external_id": "10013", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 349, "power_mw": 349, "owner": "C&S Energy Limited", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.043113", "long": "-2.077489", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10013", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "C&S Energy Limited", "Site Name": "Cellarhead - Battery Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12179", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Cellarhead Substation, Rownall Road, Wetley Rocks, Stoke on Trent", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST9 0BT", "X-coordinate": "394902", "Y-coordinate": "349541", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2021/0695", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "21/06/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.043113", "long": "-2.077489", "status": "planning", "mw": 349, "ext_id": "10013"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/06/2022", "to": "29/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10013", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "C&S Energy Limited", "Site Name": "Cellarhead - Battery Site", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12179", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Cellarhead Substation, Rownall Road, Wetley Rocks, Stoke on Trent", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST9 0BT", "X-coordinate": "394902", "Y-coordinate": "349541", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2021/0695", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "21/06/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.043113", "long": "-2.077489", "status": "planning", "mw": 349, "ext_id": "10013"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 349, "mwh_is_estimate": true, "mwh": 349, "mwh_estimate": 349, "status": "planning", "status_class": "", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cellarhead - Battery Site", "name_short": "Cellarhead - Battery Site", "owner": "C&S Energy Limited", "state": "west midlands", "country": "uk", "lat": "53.043113", "long": "-2.077489", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.043113+-2.077489", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "597", "external_id": "10022", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "SSE Enterprise Contracting", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "597", "external_id": "10022", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane - Battery Storage Energy", "external_id": "10022", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "SSE Enterprise Contracting", "status": "planning", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.721092", "long": "-1.276017", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10022", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "SSE Enterprise Contracting", "Site Name": "Kirkhaw Lane - Battery Storage Energy", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Ferrybridge Power Station, Kirkhaw Lane, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RB ", "X-coordinate": "447872", "Y-coordinate": "425208", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02758/CPL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.721092", "long": "-1.276017", "status": "planning", "mw": 150, "ext_id": "10022"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10022", "Record Last Updated (dd/mm/yyyy)": "29/11/2021", "Operator (or Applicant)": "SSE Enterprise Contracting", "Site Name": "Kirkhaw Lane - Battery Storage Energy", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9115", "Address": "Ferrybridge Power Station, Kirkhaw Lane, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RB ", "X-coordinate": "447872", "Y-coordinate": "425208", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02758/CPL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.721092", "long": "-1.276017", "status": "planning", "mw": 150, "ext_id": "10022"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane - Battery Storage Energy", "name_short": "Kirkhaw Lane - Battery Storage", "owner": "SSE Enterprise Contracting", "state": "yorkshire and humber", "country": "uk", "lat": "53.721092", "long": "-1.276017", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.721092+-1.276017", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Electricity Sub Station, Strichen - Battery Storage Facility", "city": "", "id": "598", "external_id": "10039", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "598", "external_id": "10039", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Electricity Sub Station, Strichen - Battery Storage Facility", "external_id": "10039", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Intelligent Land Investments Group plc", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.58907", "long": "-2.06495", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10039", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Intelligent Land Investments Group plc", "Site Name": "Electricity Sub Station, Strichen - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Adj Electricity Sub Station Strichen ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 6RH ", "X-coordinate": "396216", "Y-coordinate": "855450", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2021/2556 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.58907", "long": "-2.06495", "status": "planning", "mw": 50, "ext_id": "10039"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/12/2021", "to": "04/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "01/03/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/03/2022", "to": "02/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10039", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Intelligent Land Investments Group plc", "Site Name": "Electricity Sub Station, Strichen - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Electricity Sub Station Strichen ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 6RH ", "X-coordinate": "396216", "Y-coordinate": "855450", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2021/2556 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.58907", "long": "-2.06495", "status": "planning", "mw": 50, "ext_id": "10039"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Electricity Sub Station, Strichen - Battery Storage Facility", "name_short": "Electricity Sub Station, Strichen", "owner": "Intelligent Land Investments Group plc", "state": "scotland", "country": "uk", "lat": "57.58907", "long": "-2.06495", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.58907+-2.06495", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Caton Road, Lancaster - Battery Storage Facility", "city": "", "id": "599", "external_id": "10047", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Energi Generation 12 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "599", "external_id": "10047", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Caton Road, Lancaster - Battery Storage Facility", "external_id": "10047", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Energi Generation 12 Limited", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.068278", "long": "-2.786902", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10047", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Energi Generation 12 Limited", "Site Name": "Caton Road, Lancaster - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The North East Of Kidds Transport Limited Caton Road Lancaster ", "County": "Lancashire ", "Region": "North West", "Country": "England", "Post Code": "LA1 3PE ", "X-coordinate": "348600", "Y-coordinate": "463880", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/01351/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "54.068278", "long": "-2.786902", "status": "planning", "mw": 25, "ext_id": "10047"}, "first_month": "2021-12", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/12/2021", "to": "13/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "07/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/12/2027", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10047", "Record Last Updated (dd/mm/yyyy)": "13/12/2022", "Operator (or Applicant)": "Energi Generation 12 Limited", "Site Name": "Caton Road, Lancaster - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The North East Of Kidds Transport Limited Caton Road Lancaster ", "County": "Lancashire ", "Region": "North West", "Country": "England", "Post Code": "LA1 3PE ", "X-coordinate": "348600", "Y-coordinate": "463880", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "21/01351/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/12/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.068278", "long": "-2.786902", "status": "planning", "mw": 25, "ext_id": "10047"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Caton Road, Lancaster - Battery Storage Facility", "name_short": "Caton Road, Lancaster", "owner": "Energi Generation 12 Limited", "state": "north west", "country": "uk", "lat": "54.068278", "long": "-2.786902", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.068278+-2.786902", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "St Dennis - Battery Energy Storage", "city": "", "id": "600", "external_id": "10058", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Renewable Connections Ltd / Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "600", "external_id": "10058", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "St Dennis - Battery Energy Storage", "external_id": "10058", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Renewable Connections Ltd / Pivot Power", "status": "planning", "date_first_heard": "2022-02-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.390904", "long": "-4.894964", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10058", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Renewable Connections Ltd / Pivot Power", "Site Name": "St Dennis - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Indian Queens Sub-Station B3279 From Gaverigan To Carne Hill St Dennis, St Austell", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194320", "Y-coordinate": "58565", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA21/10827", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.390904", "long": "-4.894964", "status": "planning", "mw": 100, "ext_id": "10058"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/12/2021", "to": "08/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "02/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "02/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/02/2022", "to": "02/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "14461 & 14687", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10058", "Record Last Updated (dd/mm/yyyy)": "02/12/2021", "Operator (or Applicant)": "Renewable Connections Ltd / Pivot Power", "Site Name": "St Dennis - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14461 & 14687", "Are they re-applying (Old REPD Ref) ": "", "Address": "Indian Queens Sub-Station B3279 From Gaverigan To Carne Hill St Dennis, St Austell", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194320", "Y-coordinate": "58565", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA21/10827", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.390904", "long": "-4.894964", "status": "planning", "mw": 100, "ext_id": "10058"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-02-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "St Dennis - Battery Energy Storage", "name_short": "St Dennis", "owner": "Renewable Connections Ltd / Pivot Power", "state": "south west", "country": "uk", "lat": "50.390904", "long": "-4.894964", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.390904+-4.894964", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Park Road Battery Storage", "city": "", "id": "601", "external_id": "10076", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Arlington Energy Limited Avery Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "601", "external_id": "10076", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Park Road Battery Storage", "external_id": "10076", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Arlington Energy Limited Avery Energy", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.695448", "long": "-2.203131", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10076", "Record Last Updated (dd/mm/yyyy)": "07/12/2021", "Operator (or Applicant)": "Arlington Energy Limited Avery Energy", "Site Name": "Park Road Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Park Road, Bacup", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL13 0BW", "X-coordinate": "386685", "Y-coordinate": "422131", "Planning Authority": "Rossendale Borough Council", "Planning Application Reference": "2021/0456", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.695448", "long": "-2.203131", "status": "planning", "mw": 10, "ext_id": "10076"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/12/2021", "to": "26/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "19/11/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10076", "Record Last Updated (dd/mm/yyyy)": "26/09/2022", "Operator (or Applicant)": "Arlington Energy Limited Avery Energy", "Site Name": "Park Road Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Park Road, Bacup", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL13 0BW", "X-coordinate": "386685", "Y-coordinate": "422131", "Planning Authority": "Rossendale Borough Council", "Planning Application Reference": "2021/0456", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/07/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/11/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/11/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.695448", "long": "-2.203131", "status": "planning", "mw": 10, "ext_id": "10076"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Park Road Battery Storage", "name_short": "Park Road", "owner": "Arlington Energy Limited Avery Energy", "state": "north west", "country": "uk", "lat": "53.695448", "long": "-2.203131", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.695448+-2.203131", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greystones Road, Grangetown - Battery Energy Storage System", "city": "", "id": "602", "external_id": "10081", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "360", "power_mw": "360", "customer": "", "owner": "Sembcorp Utilities UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "602", "external_id": "10081", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Greystones Road, Grangetown - Battery Energy Storage System", "external_id": "10081", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Sembcorp Utilities UK Limited", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.572705", "long": "-1.129556", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10081", "Record Last Updated (dd/mm/yyyy)": "11/11/2021", "Operator (or Applicant)": "Sembcorp Utilities UK Limited", "Site Name": "Greystones Road, Grangetown - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "360.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Wilton Internationaln Off A1053 Greystones Roadn Grangetown", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8JH", "X-coordinate": "456370", "Y-coordinate": "520069", "Planning Authority": "Redcar and Cleveland Council", "Planning Application Reference": "R/2021/0888/CL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "54.572705", "long": "-1.129556", "status": "planning", "mw": 360, "ext_id": "10081"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2021", "to": "11/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Redcar and Cleveland Council", "to": "Redcar and Cleveland Borough Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/12/2021", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "PD", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/02/2022", "to": "11/11/2021", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "360", "to": "60", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Redcar and Cleveland Borough Council", "to": "Redcar & Cleveland Borough Council", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 360, "to": 60, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10081", "Record Last Updated (dd/mm/yyyy)": "11/11/2021", "Operator (or Applicant)": "Sembcorp Utilities UK Limited", "Site Name": "Greystones Road, Grangetown - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wilton Internationaln Off A1053 Greystones Roadn Grangetown", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8JH", "X-coordinate": "456370", "Y-coordinate": "520069", "Planning Authority": "Redcar & Cleveland Borough Council", "Planning Application Reference": "R/2021/0888/CL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572705", "long": "-1.129556", "status": "planning", "mw": 60, "ext_id": "10081"}, "current_month": "2024-01", "dates": {"first_heard": "2021-11-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Greystones Road, Grangetown - Battery Energy Storage System", "name_short": "Greystones Road, Grangetown - Batte...", "owner": "Sembcorp Utilities UK Limited", "state": "north east", "country": "uk", "lat": "54.572705", "long": "-1.129556", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.572705+-1.129556", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "city": "", "id": "603", "external_id": "10163", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Fleet BESS Limited & SSE Energy Solutions Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "603", "external_id": "10163", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "external_id": "10163", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Fleet BESS Limited & SSE Energy Solutions Limited", "status": "planning", "date_first_heard": "2023-01-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.237175", "long": "-0.890978", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10163", "Record Last Updated (dd/mm/yyyy)": "24/12/2021", "Operator (or Applicant)": "Fleet BESS Limited & SSE Energy Solutions Limited", "Site Name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": " Penn Croft Farm Penn Croft Crondall Farnham ", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "GU10 5PX ", "X-coordinate": "477520", "Y-coordinate": "149250", "Planning Authority": "Hart District Council", "Planning Application Reference": "21/02937/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.237175", "long": "-0.890978", "status": "planning", "mw": 100, "ext_id": "10163"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/12/2021", "to": "06/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/02/2023", "to": "24/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10163", "Record Last Updated (dd/mm/yyyy)": "24/12/2021", "Operator (or Applicant)": "Fleet BESS Limited & SSE Energy Solutions Limited", "Site Name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Penn Croft Farm Penn Croft Crondall Farnham ", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "GU10 5PX ", "X-coordinate": "477520", "Y-coordinate": "149250", "Planning Authority": "Hart District Council", "Planning Application Reference": "21/02937/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.237175", "long": "-0.890978", "status": "planning", "mw": 100, "ext_id": "10163"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-01-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "name_short": "Penn Croft Farm, Crondall - Battery...", "owner": "Fleet BESS Limited & SSE Energy Solutions Limited", "state": "south east", "country": "uk", "lat": "51.237175", "long": "-0.890978", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.237175+-0.890978", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "A981 Fraserburgh - Battery Energy Storage", "city": "", "id": "606", "external_id": "10222", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Fraserburgh Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "606", "external_id": "10222", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "A981 Fraserburgh - Battery Energy Storage", "external_id": "10222", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Fraserburgh Energy Limited", "status": "planning", "date_first_heard": "2022-02-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.671398", "long": "-2.026323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10222", "Record Last Updated (dd/mm/yyyy)": "29/12/2021", "Operator (or Applicant)": "Fraserburgh Energy Limited", "Site Name": "A981 Fraserburgh - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "E/O A981 Fraserburgh", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8TT", "X-coordinate": "398529", "Y-coordinate": "864614", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2021/2855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.671398", "long": "-2.026323", "status": "planning", "mw": 25, "ext_id": "10222"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/12/2021", "to": "28/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/02/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "21/02/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10222", "Record Last Updated (dd/mm/yyyy)": "28/02/2022", "Operator (or Applicant)": "Fraserburgh Energy Limited", "Site Name": "A981 Fraserburgh - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O A981 Fraserburgh", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8TT", "X-coordinate": "398529", "Y-coordinate": "864614", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2021/2855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.671398", "long": "-2.026323", "status": "planning", "mw": 25, "ext_id": "10222"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-02-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "A981 Fraserburgh - Battery Energy Storage", "name_short": "A981 Fraserburgh", "owner": "Fraserburgh Energy Limited", "state": "scotland", "country": "uk", "lat": "57.671398", "long": "-2.026323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.671398+-2.026323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upper Geiselittle - Energy Storage Facility", "city": "", "id": "607", "external_id": "10225", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "607", "external_id": "10225", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stainland Energy Storage Project", "external_id": "10225", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Energy Storage Limited", "status": "planning", "date_first_heard": "2022-11-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.5694", "long": "-3.506234", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10225", "Record Last Updated (dd/mm/yyyy)": "29/12/2021", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Upper Geiselittle - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "E/O The A9 N/O Upper Geiselittle Thurso ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 8YH", "X-coordinate": "312487", "Y-coordinate": "965579", "Planning Authority": "Highlands Council", "Planning Application Reference": "21/05957/PAN", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "58.5694", "long": "-3.506234", "status": "planning", "mw": 49, "ext_id": "10225"}, "first_month": "2021-12", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/12/2021", "to": "21/06/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Upper Geiselittle - Energy Storage Facility", "to": "Stainland Energy Storage Project", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/05957/PAN", "to": "22/02054/FUL", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "21/12/2021", "to": "23/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/06/2022", "to": "14/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "04/11/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "04/11/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/12/2022", "to": "29/12/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10225", "Record Last Updated (dd/mm/yyyy)": "29/12/2021", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Stainland Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O The A9 N/O Upper Geiselittle Thurso ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 8YH", "X-coordinate": "312487", "Y-coordinate": "965579", "Planning Authority": "Highland Council", "Planning Application Reference": "22/02054/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/11/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.5694", "long": "-3.506234", "status": "planning", "mw": 49, "ext_id": "10225"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-11-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stainland Energy Storage Project", "name_short": "Stainland", "owner": "Whirlwind Energy Storage Limited", "state": "scotland", "country": "uk", "lat": "58.5694", "long": "-3.506234", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.5694+-3.506234", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "city": "", "id": "608", "external_id": "10226", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "608", "external_id": "10226", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "external_id": "10226", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Statkraft UK Limited", "status": "planning", "date_first_heard": "2022-08-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.562812", "long": "-3.680387", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10226", "Record Last Updated (dd/mm/yyyy)": "24/12/2021", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "475M NW/O Hillcrest Cottage, Shebster ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7RA", "X-coordinate": "302340", "Y-coordinate": "965086", "Planning Authority": "Highlands Council", "Planning Application Reference": "21/05467/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "58.562812", "long": "-3.680387", "status": "planning", "mw": 19, "ext_id": "10226"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/12/2021", "to": "29/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "22/08/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/08/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10226", "Record Last Updated (dd/mm/yyyy)": "29/09/2022", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "475M NW/O Hillcrest Cottage, Shebster ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7RA", "X-coordinate": "302340", "Y-coordinate": "965086", "Planning Authority": "Highland Council", "Planning Application Reference": "21/05467/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.562812", "long": "-3.680387", "status": "planning", "mw": 19, "ext_id": "10226"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2022-08-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "name_short": "Hillcrest Cottage, Shebster - Batte...", "owner": "Statkraft UK Limited", "state": "scotland", "country": "uk", "lat": "58.562812", "long": "-3.680387", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.562812+-3.680387", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elland Storage Project", "city": "", "id": "609", "external_id": "10236", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "609", "external_id": "10236", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Elland Storage Project", "external_id": "10236", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "planning", "date_first_heard": "2020-12-23", "start_construction": "2022-08-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10236", "Record Last Updated (dd/mm/yyyy)": "10/01/2022", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Elland Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "20/01226/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "10236"}, "first_month": "2021-12", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2022", "to": "15/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "23/12/2023", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/08/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/08/2022", "to": "20/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/08/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "15304", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10236", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Elland Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15304", "Are they re-applying (Old REPD Ref) ": "7053", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "20/01226/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/12/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/12/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "10236"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-10", "start_construction": "2022-08-15", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-12-23", "start_construction": "2022-08-15", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Elland Storage Project", "name_short": "Elland Storage", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.692652+-1.82446", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lethen Wind Farm Wind Turbines and Energy Storage", "city": "", "id": "610", "external_id": "10237", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Fred Olsen Renewables Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "610", "external_id": "10237", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lethen Wind Farm Wind Turbines and Energy Storage", "external_id": "10237", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Fred Olsen Renewables Ltd", "status": "planning", "date_first_heard": "2022-01-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.399518", "long": "-3.779239", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10237", "Record Last Updated (dd/mm/yyyy)": "10/01/2022", "Operator (or Applicant)": "Fred Olsen Renewables Ltd", "Site Name": "Lethen Wind Farm Wind Turbines and Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8489", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land 4700M NW Of Gamekeepers Cottage Nairn", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12", "X-coordinate": "293179", "Y-coordinate": "835745", "Planning Authority": "Highland Council", "Planning Application Reference": "21/05946/S36", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.399518", "long": "-3.779239", "status": "planning", "mw": 10, "ext_id": "10237"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/01/2022", "to": "24/01/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Highland Council", "to": "Scottish Government (S36)", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "21/05946/S36", "to": "ECU00002216", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "20/12/2021", "to": "21/01/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/01/2022", "to": "10/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10237", "Record Last Updated (dd/mm/yyyy)": "10/01/2022", "Operator (or Applicant)": "Fred Olsen Renewables Ltd", "Site Name": "Lethen Wind Farm Wind Turbines and Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8489", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 4700M NW Of Gamekeepers Cottage Nairn", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12", "X-coordinate": "293179", "Y-coordinate": "835745", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002216", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.399518", "long": "-3.779239", "status": "planning", "mw": 10, "ext_id": "10237"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2022-01-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lethen Wind Farm Wind Turbines and Energy Storage", "name_short": "Lethen Wind Farm Wind Turbines", "owner": "Fred Olsen Renewables Ltd", "state": "scotland", "country": "uk", "lat": "57.399518", "long": "-3.779239", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.399518+-3.779239", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordtown Energy Storage (Resubmission)", "city": "", "id": "611", "external_id": "10239", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments (ILI)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "611", "external_id": "10239", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordtown Energy Storage", "external_id": "10239", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Private Developer", "status": "planning", "date_first_heard": "2021-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10239", "Record Last Updated (dd/mm/yyyy)": "10/12/2021", "Operator (or Applicant)": "Intelligent Land Investments (ILI)", "Site Name": "Fordtown Energy Storage (Resubmission)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2020/1673", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 49, "ext_id": "10239"}, "first_month": "2021-12", "changes": [{"month": "2022-04", "li": [{"name": "Installed Capacity (MWelec)", "from": "49.90", "to": "19.90", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 49, "to": 19, "extra": "", "change_type": "misc"}]}, {"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/12/2021", "to": "19/05/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Intelligent Land Investments (ILI)", "to": "Private Developer", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Fordtown Energy Storage (Resubmission)", "to": "Fordtown Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "19.90", "to": "49.9", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 19, "to": 49, "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "24/02/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10239", "Record Last Updated (dd/mm/yyyy)": "19/05/2022", "Operator (or Applicant)": "Private Developer", "Site Name": "Fordtown Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7764", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2020/1673", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/02/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/02/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 49, "ext_id": "10239"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordtown Energy Storage", "name_short": "Fordtown", "owner": "Private Developer", "state": "scotland", "country": "uk", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.221396+-2.366114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hollandmey Renewable Energy Development", "city": "", "id": "612", "external_id": "10246", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Scottishpower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "612", "external_id": "10246", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hollandmey Renewable Energy Development", "external_id": "10246", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Scottishpower Renewables", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.615252", "long": "-3.216312", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10246", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "Scottishpower Renewables", "Site Name": "Hollandmey Renewable Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8061", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land At Hollandmey Farm And Ph, Phillips Mains, Mey, Thurso, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 8XH", "X-coordinate": "329442", "Y-coordinate": "970342", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003353", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "58.615252", "long": "-3.216312", "status": "planning", "mw": 15, "ext_id": "10246"}, "first_month": "2021-12", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10246", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "Scottishpower Renewables", "Site Name": "Hollandmey Renewable Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8061", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Hollandmey Farm And Ph, Phillips Mains, Mey, Thurso, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 8XH", "X-coordinate": "329442", "Y-coordinate": "970342", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003353", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.615252", "long": "-3.216312", "status": "planning", "mw": 15, "ext_id": "10246"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hollandmey Renewable Energy Development", "name_short": "Hollandmey Renewable Energy Develop...", "owner": "Scottishpower Renewables", "state": "scotland", "country": "uk", "lat": "58.615252", "long": "-3.216312", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.615252+-3.216312", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Doverdale - Solar Farm & Battery Storage", "city": "", "id": "613", "external_id": "10273", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "613", "external_id": "10273", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Doverdale - Solar Farm & Battery Storage", "external_id": "10273", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "JBM Solar Projects Limited", "status": "planning", "date_first_heard": "2021-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.292591", "long": "-2.205603", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10273", "Record Last Updated (dd/mm/yyyy)": "28/06/2021", "Operator (or Applicant)": "JBM Solar Projects Limited", "Site Name": "Doverdale - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9233", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Northwest of Doverdale, Southall Lane, Doverdale, Worcester", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "WR9 0QB", "X-coordinate": "386074", "Y-coordinate": "266071", "Planning Authority": "Wychavon District Council", "Planning Application Reference": "21/01363/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.292591", "long": "-2.205603", "status": "planning", "mw": 49, "ext_id": "10273"}, "first_month": "2021-12", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10273", "Record Last Updated (dd/mm/yyyy)": "28/06/2021", "Operator (or Applicant)": "JBM Solar Projects Limited", "Site Name": "Doverdale - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9233", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Northwest of Doverdale, Southall Lane, Doverdale, Worcester", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "WR9 0QB", "X-coordinate": "386074", "Y-coordinate": "266071", "Planning Authority": "Wychavon District Council", "Planning Application Reference": "21/01363/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.292591", "long": "-2.205603", "status": "planning", "mw": 49, "ext_id": "10273"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Doverdale - Solar Farm & Battery Storage", "name_short": "Doverdale - Solar Farm &", "owner": "JBM Solar Projects Limited", "state": "west midlands", "country": "uk", "lat": "52.292591", "long": "-2.205603", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.292591+-2.205603", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cheshire Power Station - Battery Storage Facility", "city": "", "id": "615", "external_id": "10295", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "RWE Generation UK Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "615", "external_id": "10295", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cheshire Power Station - Battery Storage Facility", "external_id": "10295", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "RWE Generation UK Plc", "status": "planning", "date_first_heard": "2023-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.29758", "long": "-2.911674", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10295", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "RWE Generation UK Plc", "Site Name": "Cheshire Power Station - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Cheshire Power Station North Road, Ellesmere Port ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH65 1AG", "X-coordinate": "339335", "Y-coordinate": "378235", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "21/04501/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.29758", "long": "-2.911674", "status": "planning", "mw": 45, "ext_id": "10295"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2021", "to": "06/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "24/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "24/05/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/06/2023", "to": "22/12/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10295", "Record Last Updated (dd/mm/yyyy)": "22/12/2021", "Operator (or Applicant)": "RWE Generation UK Plc", "Site Name": "Cheshire Power Station - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cheshire Power Station North Road, Ellesmere Port ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH65 1AG", "X-coordinate": "339335", "Y-coordinate": "378235", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "21/04501/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.29758", "long": "-2.911674", "status": "planning", "mw": 45, "ext_id": "10295"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cheshire Power Station - Battery Storage Facility", "name_short": "Cheshire Power Station", "owner": "RWE Generation UK Plc", "state": "north west", "country": "uk", "lat": "53.29758", "long": "-2.911674", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.29758+-2.911674", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "city": "", "id": "616", "external_id": "10302", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Lawford Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "616", "external_id": "10302", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "external_id": "10302", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Lawford Power Limited", "status": "planning", "date_first_heard": "2022-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.916682", "long": "1.016563", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10302", "Record Last Updated (dd/mm/yyyy)": "23/12/2021", "Operator (or Applicant)": "Lawford Power Limited", "Site Name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Adj Lawford Grid Substation Ardleigh Road Little Bromley ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CO11 2QB ", "X-coordinate": "607553", "Y-coordinate": "228539", "Planning Authority": "Tendring District Council", "Planning Application Reference": "21/02070/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.916682", "long": "1.016563", "status": "planning", "mw": 50, "ext_id": "10302"}, "first_month": "2021-12", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/12/2021", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10302", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": "Lawford Power Limited", "Site Name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Lawford Grid Substation Ardleigh Road Little Bromley ", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CO11 2QB ", "X-coordinate": "607553", "Y-coordinate": "228539", "Planning Authority": "Tendring District Council", "Planning Application Reference": "21/02070/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.916682", "long": "1.016563", "status": "planning", "mw": 50, "ext_id": "10302"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "name_short": "Ardleigh Road, Little Bromley", "owner": "Lawford Power Limited", "state": "eastern", "country": "uk", "lat": "51.916682", "long": "1.016563", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.916682+1.016563", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stoke Lane - Battery Energy Storage", "city": "", "id": "618", "external_id": "10390", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "FPC Electric Land Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "618", "external_id": "10390", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stoke Lane - Battery Energy Storage", "external_id": "10390", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 130, "power_mw": 130, "owner": "FPC Electric Land Limited", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.565947", "long": "1.278153", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10390", "Record Last Updated (dd/mm/yyyy)": "16/12/2021", "Operator (or Applicant)": "FPC Electric Land Limited", "Site Name": "Stoke Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "130.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O Stoke Lane Dunston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8QD", "X-coordinate": "622270", "Y-coordinate": "301506", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2021/2645", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.565947", "long": "1.278153", "status": "planning", "mw": 130, "ext_id": "10390"}, "first_month": "2021-12", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/12/2021", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "09/09/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10390", "Record Last Updated (dd/mm/yyyy)": "17/10/2022", "Operator (or Applicant)": "FPC Electric Land Limited", "Site Name": "Stoke Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "130", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Stoke Lane Dunston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8QD", "X-coordinate": "622270", "Y-coordinate": "301506", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2021/2645", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.565947", "long": "1.278153", "status": "planning", "mw": 130, "ext_id": "10390"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 130, "mwh_is_estimate": true, "mwh": 130, "mwh_estimate": 130, "status": "planning", "status_class": "", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stoke Lane - Battery Energy Storage", "name_short": "Stoke Lane", "owner": "FPC Electric Land Limited", "state": "eastern", "country": "uk", "lat": "52.565947", "long": "1.278153", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.565947+1.278153", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Speyslaw Farm - Battery Storage", "city": "", "id": "619", "external_id": "10394", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Elgin Energy EsCo", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "619", "external_id": "10394", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Speyslaw Farm - Battery Storage", "external_id": "10394", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Elgin Energy EsCo", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.673978", "long": "-3.194697", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10394", "Record Last Updated (dd/mm/yyyy)": "16/12/2021", "Operator (or Applicant)": "Elgin Energy EsCo", "Site Name": "Speyslaw Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Speyslaw Farm", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV30 8LX", "X-coordinate": "328841", "Y-coordinate": "865529", "Planning Authority": "Moray Council", "Planning Application Reference": "21/01805/APP ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.673978", "long": "-3.194697", "status": "planning", "mw": 19, "ext_id": "10394"}, "first_month": "2021-12", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/12/2021", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "09/02/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10394", "Record Last Updated (dd/mm/yyyy)": "02/03/2023", "Operator (or Applicant)": "Elgin Energy EsCo", "Site Name": "Speyslaw Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Speyslaw Farm", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV30 8LX", "X-coordinate": "328841", "Y-coordinate": "865529", "Planning Authority": "Moray Council", "Planning Application Reference": "21/01805/APP ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.673978", "long": "-3.194697", "status": "planning", "mw": 19, "ext_id": "10394"}, "current_month": "2024-01", "dates": {"first_heard": "2021-12-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Speyslaw Farm - Battery Storage", "name_short": "Speyslaw Farm", "owner": "Elgin Energy EsCo", "state": "scotland", "country": "uk", "lat": "57.673978", "long": "-3.194697", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.673978+-3.194697", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Midmill, Kintore - Battery Energy Storage", "city": "", "id": "630", "external_id": "10701", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "630", "external_id": "10701", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Midmill, Kintore - Battery Energy Storage", "external_id": "10701", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gigabox Energy Storage Limited", "status": "planning", "date_first_heard": "2022-07-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.215591", "long": "-2.341436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10701", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Gigabox Energy Storage Limited", "Site Name": "Midmill, Kintore - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Midmill Kintore Aberdeenshire ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XB", "X-coordinate": "379477", "Y-coordinate": "813922", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/0249", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.215591", "long": "-2.341436", "status": "planning", "mw": 49, "ext_id": "10701"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/03/2022", "to": "20/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/07/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/07/2022", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10701", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Gigabox Energy Storage Limited", "Site Name": "Midmill, Kintore - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Midmill Kintore Aberdeenshire ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XB", "X-coordinate": "379477", "Y-coordinate": "813922", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/0249", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.215591", "long": "-2.341436", "status": "planning", "mw": 49, "ext_id": "10701"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-07-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Midmill, Kintore - Battery Energy Storage", "name_short": "Midmill, Kintore", "owner": "Gigabox Energy Storage Limited", "state": "scotland", "country": "uk", "lat": "57.215591", "long": "-2.341436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.215591+-2.341436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rusholme Grange", "city": "", "id": "631", "external_id": "7093", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Hedge Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "631", "external_id": "7093", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rusholme Grange", "external_id": "7093", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Green Hedge Energy", "status": "planning", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7093", "Record Last Updated (dd/mm/yyyy)": "16/09/2019", "Operator (or Applicant)": "Green Hedge Energy", "Site Name": "Rusholme Grange", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2017/1018/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 35, "ext_id": "7093"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/09/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "16/09/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7093", "Record Last Updated (dd/mm/yyyy)": "16/09/2019", "Operator (or Applicant)": "Green Hedge Energy", "Site Name": "Rusholme Grange", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9121", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2017/1018/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 35, "ext_id": "7093"}, "current_month": "2024-01", "dates": {"first_heard": "2019-09-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rusholme Grange", "name_short": "Rusholme Grange", "owner": "Green Hedge Energy", "state": "yorkshire and humber", "country": "uk", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.73117+-0.937436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vicarage Drove - Solar farm & Battery storage", "city": "", "id": "632", "external_id": "8518", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Connections Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "632", "external_id": "8518", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Vicarage Drove - Solar farm & Battery storage", "external_id": "8518", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Renewable Connections Developments Limited", "status": "planning", "date_first_heard": "2022-02-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.931022", "long": "-0.222608", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8518", "Record Last Updated (dd/mm/yyyy)": "28/02/2022", "Operator (or Applicant)": "Renewable Connections Developments Limited", "Site Name": "Vicarage Drove - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8517", "Installed Capacity (MWelec)": "20.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land at Vicarage Drove, Bicker, Boston", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE20 3BF", "X-coordinate": "519567", "Y-coordinate": "338547", "Planning Authority": "Boston Borough Council", "Planning Application Reference": "B/21/0443", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.931022", "long": "-0.222608", "status": "planning", "mw": 20, "ext_id": "8518"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "17/02/2026", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/02/2022", "to": "04/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/11/2022", "to": "11/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8518", "Record Last Updated (dd/mm/yyyy)": "11/05/2022", "Operator (or Applicant)": "Renewable Connections Developments Limited", "Site Name": "Vicarage Drove - Solar farm & Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8517", "Installed Capacity (MWelec)": "20.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Vicarage Drove, Bicker, Boston", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE20 3BF", "X-coordinate": "519567", "Y-coordinate": "338547", "Planning Authority": "Boston Borough Council", "Planning Application Reference": "B/21/0443", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.931022", "long": "-0.222608", "status": "planning", "mw": 20, "ext_id": "8518"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-02-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Vicarage Drove - Solar farm & Battery storage", "name_short": "Vicarage Drove - Solar farm &", "owner": "Renewable Connections Developments Limited", "state": "east midlands", "country": "uk", "lat": "52.931022", "long": "-0.222608", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.931022+-0.222608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Moggerhanger Road, Sandy - Solar Farm", "city": "", "id": "633", "external_id": "10981", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Kach Capital Estates Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "633", "external_id": "10981", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Moggerhanger Road, Sandy - Solar Farm", "external_id": "10981", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Kach Capital Estates Limited", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.127053", "long": "-0.305484", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10981", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Kach Capital Estates Limited", "Site Name": "Moggerhanger Road, Sandy - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9349", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "N/O Moggerhanger Road, Sandy, Buntingford", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG19 1ND", "X-coordinate": "516096", "Y-coordinate": "248992", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/22/00752/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.127053", "long": "-0.305484", "status": "planning", "mw": 20, "ext_id": "10981"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10981", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Kach Capital Estates Limited", "Site Name": "Moggerhanger Road, Sandy - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9349", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Moggerhanger Road, Sandy, Buntingford", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG19 1ND", "X-coordinate": "516096", "Y-coordinate": "248992", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/22/00752/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.127053", "long": "-0.305484", "status": "planning", "mw": 20, "ext_id": "10981"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Moggerhanger Road, Sandy - Solar Farm", "name_short": "Moggerhanger Road, Sandy - Solar Fa...", "owner": "Kach Capital Estates Limited", "state": "eastern", "country": "uk", "lat": "52.127053", "long": "-0.305484", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.127053+-0.305484", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "city": "", "id": "635", "external_id": "10436", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Bluefield Sandbach Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "635", "external_id": "10436", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "external_id": "10436", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Bluefield Sandbach Limited", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.165369", "long": "-2.406314", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10436", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Bluefield Sandbach Limited", "Site Name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Former Power Station, Booth Lane, Moston", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW11 3PY", "X-coordinate": "372933", "Y-coordinate": "363216", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "21/6426C ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.165369", "long": "-2.406314", "status": "planning", "mw": 20, "ext_id": "10436"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10436", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Bluefield Sandbach Limited", "Site Name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Power Station, Booth Lane, Moston", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW11 3PY", "X-coordinate": "372933", "Y-coordinate": "363216", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "21/6426C ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.165369", "long": "-2.406314", "status": "planning", "mw": 20, "ext_id": "10436"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "name_short": "Former EON Power Station, Booth Lan...", "owner": "Bluefield Sandbach Limited", "state": "north west", "country": "uk", "lat": "53.165369", "long": "-2.406314", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.165369+-2.406314", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vause Farm - Battery Storage", "city": "", "id": "636", "external_id": "10989", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Sirius Renewable Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "636", "external_id": "10989", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Vause Farm - Battery Storage", "external_id": "10989", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Sirius Renewable Energy Limited", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.614427", "long": "-2.688388", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10989", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Sirius Renewable Energy Limited", "Site Name": "Vause Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "North Of Vause Farm Town Lane Charnock Richard ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR7 5HQ", "X-coordinate": "354557", "Y-coordinate": "413318", "Planning Authority": "Chorley Council", "Planning Application Reference": "22/00362/FULMAJ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.614427", "long": "-2.688388", "status": "planning", "mw": 20, "ext_id": "10989"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10989", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Sirius Renewable Energy Limited", "Site Name": "Vause Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North Of Vause Farm Town Lane Charnock Richard ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR7 5HQ", "X-coordinate": "354557", "Y-coordinate": "413318", "Planning Authority": "Chorley Council", "Planning Application Reference": "22/00362/FULMAJ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.614427", "long": "-2.688388", "status": "planning", "mw": 20, "ext_id": "10989"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Vause Farm - Battery Storage", "name_short": "Vause Farm", "owner": "Sirius Renewable Energy Limited", "state": "north west", "country": "uk", "lat": "53.614427", "long": "-2.688388", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.614427+-2.688388", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Thinford Lane, Thinford - Energy Storage", "city": "", "id": "637", "external_id": "10489", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Renewable Energy Systems Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "637", "external_id": "10489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Thinford Lane, Thinford - Energy Storage", "external_id": "10489", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Renewable Energy Systems Limited", "status": "planning", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.704808", "long": "-1.556153", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10489", "Record Last Updated (dd/mm/yyyy)": "28/01/2022", "Operator (or Applicant)": "Renewable Energy Systems Limited", "Site Name": "South Thinford Lane, Thinford - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "S/O Spennymoor Electricity Substation, South Thinford Lane, Thinford, Durham", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 5JX", "X-coordinate": "428699", "Y-coordinate": "534511", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/00120/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "54.704808", "long": "-1.556153", "status": "planning", "mw": 99, "ext_id": "10489"}, "first_month": "2022-04", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/01/2022", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "28/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10489", "Record Last Updated (dd/mm/yyyy)": "28/01/2022", "Operator (or Applicant)": "Renewable Energy Systems Limited", "Site Name": "South Thinford Lane, Thinford - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Spennymoor Electricity Substation, South Thinford Lane, Thinford, Durham", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 5JX", "X-coordinate": "428699", "Y-coordinate": "534511", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/00120/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.704808", "long": "-1.556153", "status": "planning", "mw": 99, "ext_id": "10489"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Thinford Lane, Thinford - Energy Storage", "name_short": "South Thinford Lane, Thinford", "owner": "Renewable Energy Systems Limited", "state": "north east", "country": "uk", "lat": "54.704808", "long": "-1.556153", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.704808+-1.556153", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Field House Solar Farm", "city": "", "id": "638", "external_id": "10970", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Albanwise Synergy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "638", "external_id": "10970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Field House Solar Farm", "external_id": "10970", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Albanwise Synergy Limited", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.868534", "long": "-0.346585", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10970", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Albanwise Synergy Limited", "Site Name": "Field House Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8995", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Field House Farm, Main Road, Routh, Beverley", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU17 9SL", "X-coordinate": "508818", "Y-coordinate": "442636", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "22/00824/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.868534", "long": "-0.346585", "status": "planning", "mw": 40, "ext_id": "10970"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2022", "to": "28/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "08/07/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/07/2022", "to": "11/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10970", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Albanwise Synergy Limited", "Site Name": "Field House Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8995", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Field House Farm, Main Road, Routh, Beverley", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU17 9SL", "X-coordinate": "508818", "Y-coordinate": "442636", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "22/00824/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.868534", "long": "-0.346585", "status": "planning", "mw": 40, "ext_id": "10970"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Field House Solar Farm", "name_short": "Field House Solar Farm", "owner": "Albanwise Synergy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.868534", "long": "-0.346585", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.868534+-0.346585", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ferrymuir", "city": "", "id": "639", "external_id": "7371", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gore Street Energy Storage Fund", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-21", "start_construction": "1905-07-14", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "639", "external_id": "7371", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ferrymuir", "external_id": "7371", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gore Street Energy Storage Fund", "status": "construction", "date_first_heard": "2019-11-21", "start_construction": "2022-07-29", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.310446", "long": "-3.042318", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7371", "Record Last Updated (dd/mm/yyyy)": "17/03/2022", "Operator (or Applicant)": "Gore Street Energy Storage Fund", "Site Name": "Ferrymuir", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land west of Ferrymuir, South of Westfield Road, Cupar,", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY15 5AP", "X-coordinate": "335613", "Y-coordinate": "713603", "Planning Authority": "Fife Council", "Planning Application Reference": "19/02750/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "14/07/1905", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.310446", "long": "-3.042318", "status": "planning", "mw": 49, "ext_id": "7371"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/03/2022", "to": "21/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/11/2022", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "14/07/1905", "to": "29/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/09/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "29/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7371", "Record Last Updated (dd/mm/yyyy)": "29/07/2022", "Operator (or Applicant)": "Gore Street Energy Storage Fund", "Site Name": "Ferrymuir", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land west of Ferrymuir, South of Westfield Road, Cupar,", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY15 5AP", "X-coordinate": "335613", "Y-coordinate": "713603", "Planning Authority": "Fife Council", "Planning Application Reference": "19/02750/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/09/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/11/2022", "Under Construction": "29/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "56.310446", "long": "-3.042318", "status": "construction", "mw": 49, "ext_id": "7371"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-17", "start_construction": "2022-09-21", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-11-21", "start_construction": "2022-07-29", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ferrymuir", "name_short": "Ferrymuir", "owner": "Gore Street Energy Storage Fund", "state": "scotland", "country": "uk", "lat": "56.310446", "long": "-3.042318", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.310446+-3.042318", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Strathruddie, Kinglassie - Solar farm", "city": "", "id": "640", "external_id": "10828", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Connection Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "640", "external_id": "10828", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Strathruddie, Kinglassie - Solar farm", "external_id": "10828", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Renewable Connection Developments Limited", "status": "planning", "date_first_heard": "2022-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.163831", "long": "-3.258501", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10828", "Record Last Updated (dd/mm/yyyy)": "21/03/2022", "Operator (or Applicant)": "Renewable Connection Developments Limited", "Site Name": "Strathruddie, Kinglassie - Solar farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9403", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Strathruddie Kinglassie", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0UA", "X-coordinate": "321941", "Y-coordinate": "697509", "Planning Authority": "Fife Council", "Planning Application Reference": "21/03531/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.163831", "long": "-3.258501", "status": "planning", "mw": 20, "ext_id": "10828"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/03/2022", "to": "18/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/03/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/07/2022", "to": "21/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10828", "Record Last Updated (dd/mm/yyyy)": "21/03/2022", "Operator (or Applicant)": "Renewable Connection Developments Limited", "Site Name": "Strathruddie, Kinglassie - Solar farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9403", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Strathruddie Kinglassie", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0UA", "X-coordinate": "321941", "Y-coordinate": "697509", "Planning Authority": "Fife Council", "Planning Application Reference": "21/03531/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.163831", "long": "-3.258501", "status": "planning", "mw": 20, "ext_id": "10828"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Strathruddie, Kinglassie - Solar farm", "name_short": "Strathruddie, Kinglassie - Solar fa...", "owner": "Renewable Connection Developments Limited", "state": "scotland", "country": "uk", "lat": "56.163831", "long": "-3.258501", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.163831+-3.258501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Broomloan Road - Battery Energy Storage", "city": "", "id": "641", "external_id": "10886", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Lifetime Property Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "641", "external_id": "10886", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Broomloan Road - Battery Energy Storage", "external_id": "10886", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Lifetime Property Limited", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.855082", "long": "-4.313696", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10886", "Record Last Updated (dd/mm/yyyy)": "29/03/2022", "Operator (or Applicant)": "Lifetime Property Limited", "Site Name": "Broomloan Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "322 Broomloan Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G51 2JQ", "X-coordinate": "255269", "Y-coordinate": "664853", "Planning Authority": "Glasgow City Council", "Planning Application Reference": "22/00637/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.855082", "long": "-4.313696", "status": "planning", "mw": 49, "ext_id": "10886"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/03/2022", "to": "08/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/06/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/06/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/07/2022", "to": "29/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10886", "Record Last Updated (dd/mm/yyyy)": "29/03/2022", "Operator (or Applicant)": "Lifetime Property Limited", "Site Name": "Broomloan Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "322 Broomloan Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G51 2JQ", "X-coordinate": "255269", "Y-coordinate": "664853", "Planning Authority": "Glasgow City Council", "Planning Application Reference": "22/00637/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.855082", "long": "-4.313696", "status": "planning", "mw": 49, "ext_id": "10886"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Broomloan Road - Battery Energy Storage", "name_short": "Broomloan Road", "owner": "Lifetime Property Limited", "state": "scotland", "country": "uk", "lat": "55.855082", "long": "-4.313696", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.855082+-4.313696", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "city": "", "id": "642", "external_id": "10716", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "R & S Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "642", "external_id": "10716", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "external_id": "10716", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "R & S Energy Limited", "status": "planning", "date_first_heard": "2022-04-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.272655", "long": "-1.8794", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10716", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "R & S Energy Limited", "Site Name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "16.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "STOR Facility, Waterswallows Road, Green Fairfield, Buxton", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK17 7JB", "X-coordinate": "408140", "Y-coordinate": "375081", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2022/0047", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.272655", "long": "-1.8794", "status": "planning", "mw": 16, "ext_id": "10716"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/03/2022", "to": "19/04/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/04/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "08/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2022", "to": "04/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10716", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "R & S Energy Limited", "Site Name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "STOR Facility, Waterswallows Road, Green Fairfield, Buxton", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK17 7JB", "X-coordinate": "408140", "Y-coordinate": "375081", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2022/0047", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.272655", "long": "-1.8794", "status": "planning", "mw": 16, "ext_id": "10716"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2022-04-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "name_short": "Waterswallows Road, Green Fairfield...", "owner": "R & S Energy Limited", "state": "east midlands", "country": "uk", "lat": "53.272655", "long": "-1.8794", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.272655+-1.8794", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Model Farm", "city": "", "id": "643", "external_id": "10687", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "643", "external_id": "10687", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Model Farm", "external_id": "10687", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Tribus Clean Energy", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.728144", "long": "0.195226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10687", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Model Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JF", "X-coordinate": "548338", "Y-coordinate": "316760", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "21/01715/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.728144", "long": "0.195226", "status": "planning", "mw": 49, "ext_id": "10687"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "27/01/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "King's Lynn and West Norfolk Borough Council", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10687", "Record Last Updated (dd/mm/yyyy)": "24/02/2022", "Operator (or Applicant)": "Tribus Clean Energy", "Site Name": "Model Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7609", "Address": "Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7JF", "X-coordinate": "548338", "Y-coordinate": "316760", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "21/01715/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/01/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.728144", "long": "0.195226", "status": "planning", "mw": 49, "ext_id": "10687"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Model Farm", "name_short": "Model Farm", "owner": "Tribus Clean Energy", "state": "eastern", "country": "uk", "lat": "52.728144", "long": "0.195226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.728144+0.195226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walpole St Andrew - Battery storage ", "city": "", "id": "644", "external_id": "10876", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Alfred Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "644", "external_id": "10876", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walpole St Andrew - Battery storage ", "external_id": "10876", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Alfred Energy Limited", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.725219", "long": "0.204631", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10876", "Record Last Updated (dd/mm/yyyy)": "29/03/2022", "Operator (or Applicant)": "Alfred Energy Limited", "Site Name": "Walpole St Andrew - Battery storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Opp Walpole Sub Station Walpole Bank Walpole St Andrew, Wisbech", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14", "X-coordinate": "548983", "Y-coordinate": "316454", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "22/00438/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.725219", "long": "0.204631", "status": "planning", "mw": 100, "ext_id": "10876"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/03/2022", "to": "11/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "King's Lynn and West Norfolk Borough Council", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/10/2022", "to": "29/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10876", "Record Last Updated (dd/mm/yyyy)": "29/03/2022", "Operator (or Applicant)": "Alfred Energy Limited", "Site Name": "Walpole St Andrew - Battery storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opp Walpole Sub Station Walpole Bank Walpole St Andrew, Wisbech", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14", "X-coordinate": "548983", "Y-coordinate": "316454", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/00438/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.725219", "long": "0.204631", "status": "planning", "mw": 100, "ext_id": "10876"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walpole St Andrew - Battery storage ", "name_short": "Walpole St Andrew - Battery storage...", "owner": "Alfred Energy Limited", "state": "eastern", "country": "uk", "lat": "52.725219", "long": "0.204631", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.725219+0.204631", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Netherlands Way - Battery Energy Facility", "city": "", "id": "645", "external_id": "10429", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Volta Energy Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "645", "external_id": "10429", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Netherlands Way - Battery Energy Facility", "external_id": "10429", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Volta Energy Group", "status": "planning", "date_first_heard": "2022-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.610022", "long": "-0.178103", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10429", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Volta Energy Group", "Site Name": "Netherlands Way - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Netherlands Way, Immingham, Grimsby", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN41 8DF", "X-coordinate": "520633", "Y-coordinate": "414150", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/0762/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.610022", "long": "-0.178103", "status": "planning", "mw": 80, "ext_id": "10429"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7090", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/01/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10429", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Volta Energy Group", "Site Name": "Netherlands Way - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7090", "Address": "Netherlands Way, Immingham, Grimsby", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN41 8DF", "X-coordinate": "520633", "Y-coordinate": "414150", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/0762/21/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/01/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.610022", "long": "-0.178103", "status": "planning", "mw": 80, "ext_id": "10429"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2022-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Netherlands Way - Battery Energy Facility", "name_short": "Netherlands Way - Battery Energy Fa...", "owner": "Volta Energy Group", "state": "yorkshire and humber", "country": "uk", "lat": "53.610022", "long": "-0.178103", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.610022+-0.178103", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Broadgate, Chadderton - Battery Storage Containers", "city": "", "id": "648", "external_id": "10690", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "648", "external_id": "10690", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Broadgate, Chadderton - Battery Storage Containers", "external_id": "10690", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2022-05-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.532153", "long": "-2.165793", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10690", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Broadgate, Chadderton - Battery Storage Containers", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "The National Grid Station, Broadgate, Chadderton, Oldham", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL9 9XB", "X-coordinate": "389108", "Y-coordinate": "403957", "Planning Authority": "Oldham Metropolitan Borough Council", "Planning Application Reference": "FUL/348501/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.532153", "long": "-2.165793", "status": "planning", "mw": 20, "ext_id": "10690"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/03/2022", "to": "14/06/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "19/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "19/05/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/06/2022", "to": "01/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10690", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Broadgate, Chadderton - Battery Storage Containers", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The National Grid Station, Broadgate, Chadderton, Oldham", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL9 9XB", "X-coordinate": "389108", "Y-coordinate": "403957", "Planning Authority": "Oldham Metropolitan Borough Council", "Planning Application Reference": "FUL/348501/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.532153", "long": "-2.165793", "status": "planning", "mw": 20, "ext_id": "10690"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-05-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Broadgate, Chadderton - Battery Storage Containers", "name_short": "Broadgate, Chadderton - Battery Sto...", "owner": "Pelagic Energy", "state": "north west", "country": "uk", "lat": "53.532153", "long": "-2.165793", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.532153+-2.165793", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pleasance Road - Battery Energy Facility", "city": "", "id": "649", "external_id": "9997", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coronation Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "649", "external_id": "9997", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pleasance Road - Battery Energy Facility", "external_id": "9997", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gresham House", "status": "planning", "date_first_heard": "2022-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.542146", "long": "-3.273271", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9997", "Record Last Updated (dd/mm/yyyy)": "08/03/2022", "Operator (or Applicant)": "Coronation Power Limited", "Site Name": "Pleasance Road - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": " 130 Metres South East Of Coupar Angus Substation Pleasance Road Coupar ", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9LZ", "X-coordinate": "321803", "Y-coordinate": "739631", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/00195/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.542146", "long": "-3.273271", "status": "planning", "mw": 49, "ext_id": "9997"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/03/2022", "to": "12/07/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Coronation Power Limited", "to": "Gresham House", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/06/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "01/06/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9997", "Record Last Updated (dd/mm/yyyy)": "12/07/2022", "Operator (or Applicant)": "Gresham House", "Site Name": "Pleasance Road - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7217", "Address": " 130 Metres South East Of Coupar Angus Substation Pleasance Road Coupar ", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9LZ", "X-coordinate": "321803", "Y-coordinate": "739631", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/00195/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.542146", "long": "-3.273271", "status": "planning", "mw": 49, "ext_id": "9997"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Pleasance Road - Battery Energy Facility", "name_short": "Pleasance Road - Battery Energy Fac...", "owner": "Gresham House", "state": "scotland", "country": "uk", "lat": "56.542146", "long": "-3.273271", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.542146+-3.273271", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Binn Eco Park Wind Farm Energy Storage Facility", "city": "", "id": "650", "external_id": "9098", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Green Cat Renewables Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "650", "external_id": "9098", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Binn Eco Park - Battery", "external_id": "9098", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Green Cat Renewables Developments", "status": "construction", "date_first_heard": "2021-07-12", "start_construction": "2023-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.305805", "long": "-3.338259", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9098", "Record Last Updated (dd/mm/yyyy)": "11/02/2022", "Operator (or Applicant)": "Green Cat Renewables Developments", "Site Name": "Binn Eco Park Wind Farm Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Binn Eco Park Wind Farm Glenfarg", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH2 9PX", "X-coordinate": "317295", "Y-coordinate": "713403", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "21/00834/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/07/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.305805", "long": "-3.338259", "status": "planning", "mw": 10, "ext_id": "9098"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "12/07/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/02/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Binn Eco Park Wind Farm Energy Storage Facility", "to": "Binn Eco Park - Battery", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Stand-alone Storage", "to": "Co-located with RE", "extra": "", "change_type": "misc"}, {"name": "Storage Co-location REPD Ref ID", "from": "", "to": "4817, 7807, 9071 & 13672", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2023", "to": "27/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/09/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "9098", "Record Last Updated (dd/mm/yyyy)": "27/10/2023", "Operator (or Applicant)": "Green Cat Renewables Developments", "Site Name": "Binn Eco Park - Battery", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4817, 7807, 9071 & 13672", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Binn Eco Park Wind Farm Glenfarg", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH2 9PX", "X-coordinate": "317295", "Y-coordinate": "713403", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "21/00834/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/07/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/07/2024", "Under Construction": "01/09/2023", "Operational": "", "Heat Network Ref": "", "lat": "56.305805", "long": "-3.338259", "status": "construction", "mw": 10, "ext_id": "9098"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-11", "start_construction": "2023-10-27", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-07-12", "start_construction": "2023-09-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Binn Eco Park - Battery", "name_short": "Binn Eco Park - Battery", "owner": "Green Cat Renewables Developments", "state": "scotland", "country": "uk", "lat": "56.305805", "long": "-3.338259", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.305805+-3.338259", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Jamesfield Organic Centre, Phase 1", "city": "Abernethy", "id": "651", "external_id": "10456", "state": "fife", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "Possible duplicate of 130", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "651", "external_id": "10456", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Jamesfield Organic Centre, Phase 1", "external_id": "10456", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Harmony Energy Storage", "status": "planning", "date_first_heard": "2017-09-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.342816", "long": "-3.291569", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10456", "Record Last Updated (dd/mm/yyyy)": "26/01/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre, Phase 1", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar,", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "320261", "Y-coordinate": "717467", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "17/00951/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.342816", "long": "-3.291569", "status": "planning", "mw": 30, "ext_id": "10456"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10456", "Record Last Updated (dd/mm/yyyy)": "26/01/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre, Phase 1", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10863", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar,", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "320261", "Y-coordinate": "717467", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "17/00951/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.342816", "long": "-3.291569", "status": "planning", "mw": 30, "ext_id": "10456"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2017-09-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Jamesfield Organic Centre, Phase 1", "name_short": "Jamesfield Organic Centre, Phase 1", "owner": "Harmony Energy Storage", "state": "scotland", "country": "uk", "lat": "56.342816", "long": "-3.291569", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.342816+-3.291569", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Possible duplicate of 130"], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Plymouth Stor Generation - Battery storage", "city": "", "id": "652", "external_id": "10432", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "652", "external_id": "10432", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Plymouth Stor Generation - Battery storage", "external_id": "10432", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2022-01-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.367803", "long": "-4.112536", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10432", "Record Last Updated (dd/mm/yyyy)": "21/01/2022", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Plymouth Stor Generation - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Plymouth Stor Generation, Faraday Road, Plymouth", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "PL4 0ST", "X-coordinate": "249857", "Y-coordinate": "54123", "Planning Authority": "Plymouth City Council", "Planning Application Reference": "21/00757/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.367803", "long": "-4.112536", "status": "planning", "mw": 20, "ext_id": "10432"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10432", "Record Last Updated (dd/mm/yyyy)": "21/01/2022", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Plymouth Stor Generation - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Plymouth Stor Generation, Faraday Road, Plymouth", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "PL4 0ST", "X-coordinate": "249857", "Y-coordinate": "54123", "Planning Authority": "Plymouth City Council", "Planning Application Reference": "21/00757/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/04/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.367803", "long": "-4.112536", "status": "planning", "mw": 20, "ext_id": "10432"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-01-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Plymouth Stor Generation - Battery storage", "name_short": "Plymouth Stor Generation", "owner": "Green Frog Power 214 Limited", "state": "south west", "country": "uk", "lat": "50.367803", "long": "-4.112536", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.367803+-4.112536", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackhillock Electricity Substation - Battery Energy Storage System", "city": "", "id": "653", "external_id": "9723", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Zenobe Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "653", "external_id": "9723", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackhillock Electricity Substation - Battery Energy Storage System", "external_id": "9723", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 300, "power_mw": 300, "owner": "Zenobe Energy Limited", "status": "construction", "date_first_heard": "2022-09-30", "start_construction": "2023-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.518394", "long": "-2.947527", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9723", "Record Last Updated (dd/mm/yyyy)": "27/01/2022", "Operator (or Applicant)": "Zenobe Energy Limited", "Site Name": "Blackhillock Electricity Substation - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "400m SE/O Blackhillock Electricity Substation, Keith", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NY", "X-coordinate": "343341", "Y-coordinate": "847976", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003404", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.518394", "long": "-2.947527", "status": "planning", "mw": 300, "ext_id": "9723"}, "first_month": "2022-04", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/01/2022", "to": "07/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/09/2027", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/11/2022", "to": "20/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/02/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/02/2023", "to": "28/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9723", "Record Last Updated (dd/mm/yyyy)": "28/09/2021", "Operator (or Applicant)": "Zenobe Energy Limited", "Site Name": "Blackhillock Electricity Substation - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "400m SE/O Blackhillock Electricity Substation, Keith", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NY", "X-coordinate": "343341", "Y-coordinate": "847976", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003404", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/09/2027", "Under Construction": "01/02/2023", "Operational": "", "Heat Network Ref": "", "lat": "57.518394", "long": "-2.947527", "status": "construction", "mw": 300, "ext_id": "9723"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-27", "start_construction": "2023-02-20", "start_operation": ""}, "month_disappeared": ""}, "mw": 300, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09-30", "start_construction": "2023-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackhillock Electricity Substation - Battery Energy Storage System", "name_short": "Blackhillock Electricity Substation...", "owner": "Zenobe Energy Limited", "state": "scotland", "country": "uk", "lat": "57.518394", "long": "-2.947527", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.518394+-2.947527", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hunterston Grid Services Complex - Energy Storage Facility", "city": "", "id": "654", "external_id": "10535", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Amp Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "654", "external_id": "10535", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hunterston Grid Services Complex - Energy Storage Facility", "external_id": "10535", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Amp Energy", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.718396", "long": "-4.878195", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10535", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "Amp Energy", "Site Name": "Hunterston Grid Services Complex - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Campbelton Farm, Campbelton Road, West Kilbride", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA23 9QF", "X-coordinate": "219311", "Y-coordinate": "650973", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003319", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.718396", "long": "-4.878195", "status": "planning", "mw": 400, "ext_id": "10535"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/01/2027", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10535", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "Amp Energy", "Site Name": "Hunterston Grid Services Complex - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Campbelton Farm, Campbelton Road, West Kilbride", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA23 9QF", "X-coordinate": "219311", "Y-coordinate": "650973", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003319", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.718396", "long": "-4.878195", "status": "planning", "mw": 400, "ext_id": "10535"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hunterston Grid Services Complex - Energy Storage Facility", "name_short": "Hunterston Grid Services Complex - ...", "owner": "Amp Energy", "state": "scotland", "country": "uk", "lat": "55.718396", "long": "-4.878195", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.718396+-4.878195", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kincardine Grid Services Complex - Energy Storage Facility", "city": "", "id": "655", "external_id": "10536", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Amp Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "655", "external_id": "10536", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kincardine Grid Services Complex - Energy Storage Facility", "external_id": "10536", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Amp Energy", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.072948", "long": "-3.723051", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10536", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "Amp Energy", "Site Name": "Kincardine Grid Services Complex - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "N/O Kincardine Substation, Kincardine, Alloa", "County": "Clackmannanshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK10 4BJ", "X-coordinate": "292841", "Y-coordinate": "688019", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003326", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.072948", "long": "-3.723051", "status": "planning", "mw": 400, "ext_id": "10536"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/01/2023", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/02/2022", "to": "08/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10536", "Record Last Updated (dd/mm/yyyy)": "08/06/2022", "Operator (or Applicant)": "Amp Energy", "Site Name": "Kincardine Grid Services Complex - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Kincardine Substation, Kincardine, Alloa", "County": "Clackmannanshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK10 4BJ", "X-coordinate": "292841", "Y-coordinate": "688019", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003326", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.072948", "long": "-3.723051", "status": "planning", "mw": 400, "ext_id": "10536"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kincardine Grid Services Complex - Energy Storage Facility", "name_short": "Kincardine Grid Services Complex - ...", "owner": "Amp Energy", "state": "scotland", "country": "uk", "lat": "56.072948", "long": "-3.723051", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.072948+-3.723051", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carrick Windfarm", "city": "", "id": "656", "external_id": "10540", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "656", "external_id": "10540", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Carrick Windfarm", "external_id": "10540", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2022-02-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.240355", "long": "-4.557376", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10540", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Carrick Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7874", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Land within Carrick Forest, Kilmarnock", "County": "South Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA19", "X-coordinate": "237500", "Y-coordinate": "597000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003392", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.240355", "long": "-4.557376", "status": "planning", "mw": 20, "ext_id": "10540"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10540", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Carrick Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7874", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land within Carrick Forest, Kilmarnock", "County": "South Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA19", "X-coordinate": "237500", "Y-coordinate": "597000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003392", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.240355", "long": "-4.557376", "status": "planning", "mw": 20, "ext_id": "10540"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-02-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Carrick Windfarm", "name_short": "Carrick Windfarm", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "55.240355", "long": "-4.557376", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.240355+-4.557376", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": " Frodo Solar and Battery Energy Development", "city": "", "id": "657", "external_id": "10994", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Energy International", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "657", "external_id": "10994", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": " Frodo Solar and Battery Energy Development", "external_id": "10994", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Green Energy International", "status": "planning", "date_first_heard": "2023-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.601229", "long": "-1.915156", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10994", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "Green Energy International", "Site Name": " Frodo Solar and Battery Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10993", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Frodo Solar Farm, Crimond, Fraserburgh", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QH", "X-coordinate": "405170", "Y-coordinate": "856805", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003345", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "57.601229", "long": "-1.915156", "status": "planning", "mw": 50, "ext_id": "10994"}, "first_month": "2022-04", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/04/2022", "to": "07/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/05/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2023", "to": "12/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10994", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "Green Energy International", "Site Name": " Frodo Solar and Battery Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10993", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Frodo Solar Farm, Crimond, Fraserburgh", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QH", "X-coordinate": "405170", "Y-coordinate": "856805", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003345", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/05/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.601229", "long": "-1.915156", "status": "planning", "mw": 50, "ext_id": "10994"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": " Frodo Solar and Battery Energy Development", "name_short": " Frodo Solar and Battery Energy Dev...", "owner": "Green Energy International", "state": "scotland", "country": "uk", "lat": "57.601229", "long": "-1.915156", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.601229+-1.915156", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clachaig Glen", "city": "", "id": "658", "external_id": "10996", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "RWE UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "658", "external_id": "10996", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clachaig Glen", "external_id": "10996", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "RWE UK", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.618883", "long": "-5.625867", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10996", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "RWE UK", "Site Name": "Clachaig Glen", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8000", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Kintyre Peninsula, approximately 20km north of Campbeltown and 1.8km north east of Muasdale", "County": "Argyll and Bute", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "171789", "Y-coordinate": "642110", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002103", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.618883", "long": "-5.625867", "status": "planning", "mw": 30, "ext_id": "10996"}, "first_month": "2022-04", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10996", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "RWE UK", "Site Name": "Clachaig Glen", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8000", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6119", "Address": "Kintyre Peninsula, approximately 20km north of Campbeltown and 1.8km north east of Muasdale", "County": "Argyll and Bute", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "171789", "Y-coordinate": "642110", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002103", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.618883", "long": "-5.625867", "status": "planning", "mw": 30, "ext_id": "10996"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clachaig Glen", "name_short": "Clachaig Glen", "owner": "RWE UK", "state": "scotland", "country": "uk", "lat": "55.618883", "long": "-5.625867", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.618883+-5.625867", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chleansaid Onshore Wind Farm", "city": "", "id": "659", "external_id": "10997", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "659", "external_id": "10997", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chleansaid Onshore Wind Farm", "external_id": "10997", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ESB", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.120369", "long": "-4.344434", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10997", "Record Last Updated (dd/mm/yyyy)": "12/04/2022", "Operator (or Applicant)": "ESB", "Site Name": "Chleansaid Onshore Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7711", "Installed Capacity (MWelec)": "20.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Dalnessie Estate, approximately 13 km northeast of Lairg", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "262000", "Y-coordinate": "917000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002031", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "58.120369", "long": "-4.344434", "status": "planning", "mw": 20, "ext_id": "10997"}, "first_month": "2022-04", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/04/2022", "to": "09/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10997", "Record Last Updated (dd/mm/yyyy)": "09/01/2024", "Operator (or Applicant)": "ESB", "Site Name": "Chleansaid Onshore Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7711", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dalnessie Estate, approximately 13 km northeast of Lairg", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "262000", "Y-coordinate": "917000", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002031", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.120369", "long": "-4.344434", "status": "planning", "mw": 20, "ext_id": "10997"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chleansaid Onshore Wind Farm", "name_short": "Chleansaid Onshore Wind Farm", "owner": "ESB", "state": "scotland", "country": "uk", "lat": "58.120369", "long": "-4.344434", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.120369+-4.344434", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "city": "", "id": "660", "external_id": "7168", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Public Power Solutions (PPS) / West Sussex County Council", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "660", "external_id": "7168", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "external_id": "7168", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Public Power Solutions (PPS) / West Sussex County Council", "status": "construction", "date_first_heard": "2019-04-03", "start_construction": "2023-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.846664", "long": "-0.33157", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7168", "Record Last Updated (dd/mm/yyyy)": "11/03/2022", "Operator (or Applicant)": "Public Power Solutions (PPS) / West Sussex County Council", "Site Name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land at (former) Waste Managem, Halewick Lane, Sompting, Lancing, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "BN15 0ND", "X-coordinate": "517555", "Y-coordinate": "106564", "Planning Authority": "South Downs National Park Authority", "Planning Application Reference": "SDNP/18/06402/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.846664", "long": "-0.33157", "status": "planning", "mw": 49, "ext_id": "7168"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/03/2022", "to": "04/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/04/2022", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/08/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Under Construction", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Under Construction", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "03/04/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/07/2022", "to": "01/02/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "construction", "to": "planning", "extra": "", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7168", "Record Last Updated (dd/mm/yyyy)": "17/10/2022", "Operator (or Applicant)": "Public Power Solutions (PPS) / West Sussex County Council", "Site Name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at (former) Waste Managem, Halewick Lane, Sompting, Lancing, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "BN15 0ND", "X-coordinate": "517555", "Y-coordinate": "106564", "Planning Authority": "South Downs National Park Authority", "Planning Application Reference": "SDNP/18/06402/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/01/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/02/2023", "Operational": "", "Heat Network Ref": "", "lat": "50.846664", "long": "-0.33157", "status": "construction", "mw": 49, "ext_id": "7168"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2019-04-03", "start_construction": "2023-02-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "name_short": "Halewick Lane, Sompting - Battery-b...", "owner": "Public Power Solutions (PPS) / West Sussex County Council", "state": "south east", "country": "uk", "lat": "50.846664", "long": "-0.33157", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.846664+-0.33157", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dalmarnock Road - Battery Storage", "city": "", "id": "661", "external_id": "8507", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "661", "external_id": "8507", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dalmarnock Road - Battery Storage", "external_id": "8507", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "EcoDev Group Limited", "status": "planning", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.836236", "long": "-4.208544", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8507", "Record Last Updated (dd/mm/yyyy)": "25/03/2022", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Dalmarnock Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Dalmarnock Road, Adjacent To A749 & Downiebrae Road Rutherglen", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G73 1NY", "X-coordinate": "261783", "Y-coordinate": "662541", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/21/1525", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.836236", "long": "-4.208544", "status": "planning", "mw": 40, "ext_id": "8507"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/03/2022", "to": "11/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "16/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/05/2022", "to": "09/03/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8507", "Record Last Updated (dd/mm/yyyy)": "09/03/2021", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Dalmarnock Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dalmarnock Road, Adjacent To A749 & Downiebrae Road Rutherglen", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G73 1NY", "X-coordinate": "261783", "Y-coordinate": "662541", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/21/1525", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.836236", "long": "-4.208544", "status": "planning", "mw": 40, "ext_id": "8507"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dalmarnock Road - Battery Storage", "name_short": "Dalmarnock Road", "owner": "EcoDev Group Limited", "state": "scotland", "country": "uk", "lat": "55.836236", "long": "-4.208544", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.836236+-4.208544", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Colton - Solar photovoltaic farm, Battery storage", "city": "", "id": "662", "external_id": "10945", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "662", "external_id": "10945", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Colton - Solar photovoltaic farm, Battery storage", "external_id": "10945", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Pathfinder Clean Energy UK Dev Limited", "status": "planning", "date_first_heard": "2022-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.647306", "long": "1.089756", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10945", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Colton - Solar photovoltaic farm, Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10945", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "E/O Barnham Broom Road Colton ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR9 5DE", "X-coordinate": "609117", "Y-coordinate": "309989", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2022/0509", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.647306", "long": "1.089756", "status": "planning", "mw": 30, "ext_id": "10945"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/04/2022", "to": "08/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/06/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/07/2022", "to": "05/01/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10945", "Record Last Updated (dd/mm/yyyy)": "05/01/2024", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Colton - Solar photovoltaic farm, Battery storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10945", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Barnham Broom Road Colton ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR9 5DE", "X-coordinate": "609117", "Y-coordinate": "309989", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2022/0509", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.647306", "long": "1.089756", "status": "planning", "mw": 30, "ext_id": "10945"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Colton - Solar photovoltaic farm, Battery storage", "name_short": "Colton - Solar photovoltaic farm,", "owner": "Pathfinder Clean Energy UK Dev Limited", "state": "eastern", "country": "uk", "lat": "52.647306", "long": "1.089756", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.647306+1.089756", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Burcot Solar Farm", "city": "", "id": "663", "external_id": "9374", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Burcot Solar Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "663", "external_id": "9374", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Burcot Solar Farm", "external_id": "9374", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Burcot Solar Farm Limited", "status": "planning", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.658553", "long": "-1.181122", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9374", "Record Last Updated (dd/mm/yyyy)": "27/06/2023", "Operator (or Applicant)": "Burcot Solar Farm Limited", "Site Name": "Burcot Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9373", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15444", "Are they re-applying (Old REPD Ref) ": "", "Address": "Burcot Farm Burcot", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX14", "X-coordinate": "456741", "Y-coordinate": "195847", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P22/S0960/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "06/12/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.658553", "long": "-1.181122", "status": "planning", "mw": 49, "ext_id": "9374"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9374", "Record Last Updated (dd/mm/yyyy)": "27/06/2023", "Operator (or Applicant)": "Burcot Solar Farm Limited", "Site Name": "Burcot Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9373", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15444", "Are they re-applying (Old REPD Ref) ": "", "Address": "Burcot Farm Burcot", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX14", "X-coordinate": "456741", "Y-coordinate": "195847", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P22/S0960/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "06/12/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.658553", "long": "-1.181122", "status": "planning", "mw": 49, "ext_id": "9374"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Burcot Solar Farm", "name_short": "Burcot Solar Farm", "owner": "Burcot Solar Farm Limited", "state": "south east", "country": "uk", "lat": "51.658553", "long": "-1.181122", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.658553+-1.181122", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penstone Lane, Penn 1 - Battery Storage Facility", "city": "", "id": "664", "external_id": "10705", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "664", "external_id": "10705", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penstone Lane, Penn 1 - Battery Storage Facility", "external_id": "10705", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Anglo Renewables Limited", "status": "planning", "date_first_heard": "2022-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.560322", "long": "-2.206367", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10705", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Penstone Lane, Penn 1 - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Field At (Penn 1) Penstone Lane Lower Penn ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XD", "X-coordinate": "386107", "Y-coordinate": "295852", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "22/00044/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.560322", "long": "-2.206367", "status": "planning", "mw": 50, "ext_id": "10705"}, "first_month": "2022-04", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/03/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "11/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "01/03/2022", "extra": "", "change_type": "misc"}, {"name": "County", "from": "West Midlands", "to": "Staffordshire", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10705", "Record Last Updated (dd/mm/yyyy)": "01/03/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Penstone Lane, Penn 1 - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Field At (Penn 1) Penstone Lane Lower Penn ", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XD", "X-coordinate": "386107", "Y-coordinate": "295852", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "22/00044/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.560322", "long": "-2.206367", "status": "planning", "mw": 50, "ext_id": "10705"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penstone Lane, Penn 1 - Battery Storage Facility", "name_short": "Penstone Lane, Penn 1", "owner": "Anglo Renewables Limited", "state": "west midlands", "country": "uk", "lat": "52.560322", "long": "-2.206367", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.560322+-2.206367", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penstone Lane, Lower Penn 2 - Battery Storage", "city": "", "id": "665", "external_id": "10733", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "665", "external_id": "10733", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penstone Lane, Lower Penn 2 - Battery Storage", "external_id": "10733", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Anglo Renewables Limited", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.560286", "long": "-2.206367", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10733", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Penstone Lane, Lower Penn 2 - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "(Penn 2) Penstone Lane Lower Penn ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XD", "X-coordinate": "386107", "Y-coordinate": "295848", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "22/00045/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.560286", "long": "-2.206367", "status": "planning", "mw": 50, "ext_id": "10733"}, "first_month": "2022-04", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/03/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "29/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "04/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10733", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Penstone Lane, Lower Penn 2 - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "(Penn 2) Penstone Lane Lower Penn ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XD", "X-coordinate": "386107", "Y-coordinate": "295848", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "22/00045/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.560286", "long": "-2.206367", "status": "planning", "mw": 50, "ext_id": "10733"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penstone Lane, Lower Penn 2 - Battery Storage", "name_short": "Penstone Lane, Lower Penn 2", "owner": "Anglo Renewables Limited", "state": "west midlands", "country": "uk", "lat": "52.560286", "long": "-2.206367", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.560286+-2.206367", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "city": "", "id": "666", "external_id": "10978", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "666", "external_id": "10978", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "external_id": "10978", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Novus Renewable Services Limited", "status": "planning", "date_first_heard": "2023-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.94733", "long": "-2.020332", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10978", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10978", "Installed Capacity (MWelec)": "30.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Upper Newton Farm, Draycott Road, Upper Tean", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST10 4JN", "X-coordinate": "398731", "Y-coordinate": "338883", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2022/0160", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "52.94733", "long": "-2.020332", "status": "planning", "mw": 30, "ext_id": "10978"}, "first_month": "2022-04", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2022", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/02/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2023", "to": "11/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10978", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10978", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Upper Newton Farm, Draycott Road, Upper Tean", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST10 4JN", "X-coordinate": "398731", "Y-coordinate": "338883", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2022/0160", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.94733", "long": "-2.020332", "status": "planning", "mw": 30, "ext_id": "10978"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "name_short": "Upper Newton Farm, Upper Tean - Sol...", "owner": "Novus Renewable Services Limited", "state": "west midlands", "country": "uk", "lat": "52.94733", "long": "-2.020332", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.94733+-2.020332", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Shindour - Energy Storage Facility", "city": "", "id": "668", "external_id": "8464", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "668", "external_id": "8464", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Shindour - Energy Storage Facility", "external_id": "8464", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Gigabox Developments Limited", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.186478", "long": "-3.963437", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8464", "Record Last Updated (dd/mm/yyyy)": "18/01/2022", "Operator (or Applicant)": "Gigabox Developments Limited", "Site Name": "Shindour - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Shindour Feddal Hill Wood Braco, Dunblane", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK15", "X-coordinate": "278239", "Y-coordinate": "701052", "Planning Authority": "Tayside Council", "Planning Application Reference": "21/00756/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "56.186478", "long": "-3.963437", "status": "planning", "mw": 49, "ext_id": "8464"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/01/2022", "to": "28/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/12/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/07/2022", "to": "11/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2022", "to": "28/05/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8464", "Record Last Updated (dd/mm/yyyy)": "28/05/2021", "Operator (or Applicant)": "Gigabox Developments Limited", "Site Name": "Shindour - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Shindour Feddal Hill Wood Braco, Dunblane", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK15", "X-coordinate": "278239", "Y-coordinate": "701052", "Planning Authority": "Tayside Council", "Planning Application Reference": "21/00756/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.186478", "long": "-3.963437", "status": "planning", "mw": 49, "ext_id": "8464"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Shindour - Energy Storage Facility", "name_short": "Shindour - Energy", "owner": "Gigabox Developments Limited", "state": "scotland", "country": "uk", "lat": "56.186478", "long": "-3.963437", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.186478+-3.963437", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upton Lane, Nursling - Battery Storage Facility", "city": "", "id": "669", "external_id": "9673", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "669", "external_id": "9673", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Upton Lane, Nursling - Battery Storage Facility", "external_id": "9673", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Unknown", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.949215", "long": "-1.471777", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9673", "Record Last Updated (dd/mm/yyyy)": "10/02/2022", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "Upton Lane, Nursling - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Upton Lane Nursling Southampton", "County": "Hampshire ", "Region": "South East", "Country": "England", "Post Code": "SO16 0XY", "X-coordinate": "437203", "Y-coordinate": "116775", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "21/02799/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "50.949215", "long": "-1.471777", "status": "planning", "mw": 50, "ext_id": "9673"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/01/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/02/2022", "to": "22/09/2021", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Balance Power Projects Limited", "to": "Unknown", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9673", "Record Last Updated (dd/mm/yyyy)": "22/09/2021", "Operator (or Applicant)": "Unknown", "Site Name": "Upton Lane, Nursling - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Upton Lane Nursling Southampton", "County": "Hampshire ", "Region": "South East", "Country": "England", "Post Code": "SO16 0XY", "X-coordinate": "437203", "Y-coordinate": "116775", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "21/02799/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/01/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/01/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.949215", "long": "-1.471777", "status": "planning", "mw": 50, "ext_id": "9673"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Upton Lane, Nursling - Battery Storage Facility", "name_short": "Upton Lane, Nursling", "owner": "Unknown", "state": "south east", "country": "uk", "lat": "50.949215", "long": "-1.471777", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.949215+-1.471777", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Claydon Farm - Solar Farm & Battery Storage", "city": "", "id": "670", "external_id": "8039", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects 17 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "670", "external_id": "8039", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Claydon Farm - Solar Farm & Battery Storage", "external_id": "8039", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "JBM Solar Projects 17 Limited", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.981684", "long": "-2.099851", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8039", "Record Last Updated (dd/mm/yyyy)": "18/01/2022", "Operator (or Applicant)": "JBM Solar Projects 17 Limited", "Site Name": "Claydon Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8038", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land At Claydon Farm Claydon Tewkesbury ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL20 7BH", "X-coordinate": "393239", "Y-coordinate": "231474", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "21/00259/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "51.981684", "long": "-2.099851", "status": "planning", "mw": 49, "ext_id": "8039"}, "first_month": "2022-04", "changes": [{"month": "2022-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/01/2022", "to": "10/05/2022", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "17/12/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/05/2022", "to": "07/02/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8039", "Record Last Updated (dd/mm/yyyy)": "07/02/2021", "Operator (or Applicant)": "JBM Solar Projects 17 Limited", "Site Name": "Claydon Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8038", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Claydon Farm Claydon Tewkesbury ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL20 7BH", "X-coordinate": "393239", "Y-coordinate": "231474", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "21/00259/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/01/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.981684", "long": "-2.099851", "status": "planning", "mw": 49, "ext_id": "8039"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Claydon Farm - Solar Farm & Battery Storage", "name_short": "Claydon Farm - Solar Farm &", "owner": "JBM Solar Projects 17 Limited", "state": "south west", "country": "uk", "lat": "51.981684", "long": "-2.099851", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.981684+-2.099851", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Crow Solar Park", "city": "", "id": "672", "external_id": "7175", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "INRG Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "672", "external_id": "7175", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Little Crow Solar Park", "external_id": "7175", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 90, "power_mw": 90, "owner": "INRG Solar", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.596939", "long": "-0.594485", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7175", "Record Last Updated (dd/mm/yyyy)": "07/04/2022", "Operator (or Applicant)": "INRG Solar", "Site Name": "Little Crow Solar Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6557", "Installed Capacity (MWelec)": "90.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land located 0.6km to the east of the British Steel site at Scunthorpe, ", "County": "Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN16 1XP", "X-coordinate": "493116", "Y-coordinate": "412070", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010101", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "53.596939", "long": "-0.594485", "status": "planning", "mw": 90, "ext_id": "7175"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/04/2027", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/04/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "07/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7175", "Record Last Updated (dd/mm/yyyy)": "07/04/2022", "Operator (or Applicant)": "INRG Solar", "Site Name": "Little Crow Solar Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6557", "Installed Capacity (MWelec)": "90", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land located 0.6km to the east of the British Steel site at Scunthorpe, ", "County": "Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN16 1XP", "X-coordinate": "493116", "Y-coordinate": "412070", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010101", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/04/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.596939", "long": "-0.594485", "status": "planning", "mw": 90, "ext_id": "7175"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 90, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "planning", "status_class": "", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Little Crow Solar Park", "name_short": "Little Crow Solar Park", "owner": "INRG Solar", "state": "yorkshire and humber", "country": "uk", "lat": "53.596939", "long": "-0.594485", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.596939+-0.594485", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grendon Lakes, Grendon - Battery Storage Facility", "city": "", "id": "675", "external_id": "10955", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "675", "external_id": "10955", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grendon Lakes, Grendon - Battery Storage Facility", "external_id": "10955", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.244024", "long": "-0.722824", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10955", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes, Grendon - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14321", "Are they re-applying (Old REPD Ref) ": "9341", "Address": "Grendon Lakes, Main Road, Grendon ", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW ", "X-coordinate": "487299", "Y-coordinate": "261417", "Planning Authority": "Wellingborough Borough Council", "Planning Application Reference": "NW/22/00198/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "11/01/2023", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.244024", "long": "-0.722824", "status": "planning", "mw": 49, "ext_id": "10955"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10955", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes, Grendon - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14321", "Are they re-applying (Old REPD Ref) ": "9341", "Address": "Grendon Lakes, Main Road, Grendon ", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW ", "X-coordinate": "487299", "Y-coordinate": "261417", "Planning Authority": "Wellingborough Borough Council", "Planning Application Reference": "NW/22/00198/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "11/01/2023", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.244024", "long": "-0.722824", "status": "planning", "mw": 49, "ext_id": "10955"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grendon Lakes, Grendon - Battery Storage Facility", "name_short": "Grendon Lakes, Grendon", "owner": "Statera Energy", "state": "east midlands", "country": "uk", "lat": "52.244024", "long": "-0.722824", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.244024+-0.722824", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drumshoreland Road Battery Storage Facility", "city": "", "id": "676", "external_id": "8920", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Sirius Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "676", "external_id": "8920", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drumshoreland Road Battery Storage Facility", "external_id": "8920", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Sirius Renewables", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.892759", "long": "-3.481258", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8920", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Sirius Renewables", "Site Name": "Drumshoreland Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.90", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "\ufffdSite At Drumshoreland Road Pumpherston", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH53", "X-coordinate": "307461", "Y-coordinate": "667617", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0255/FUL/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "": "", "lat": "55.892759", "long": "-3.481258", "status": "planning", "mw": 49, "ext_id": "8920"}, "first_month": "2022-04", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2022", "to": "15/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "07/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/07/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8920", "Record Last Updated (dd/mm/yyyy)": "15/08/2022", "Operator (or Applicant)": "Sirius Renewables", "Site Name": "Drumshoreland Road Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "\ufffdSite At Drumshoreland Road Pumpherston", "County": "West Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH53", "X-coordinate": "307461", "Y-coordinate": "667617", "Planning Authority": "West Lothian Council", "Planning Application Reference": "0255/FUL/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.892759", "long": "-3.481258", "status": "planning", "mw": 49, "ext_id": "8920"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drumshoreland Road Battery Storage Facility", "name_short": "Drumshoreland Road", "owner": "Sirius Renewables", "state": "scotland", "country": "uk", "lat": "55.892759", "long": "-3.481258", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.892759+-3.481258", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "city": "", "id": "677", "external_id": "10488", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "HB222BRI Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "677", "external_id": "10488", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "external_id": "10488", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 47, "power_mw": 47, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.610387", "long": "-1.97829", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10488", "Record Last Updated (dd/mm/yyyy)": "28/01/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11810", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dog Trap Lane, Minety, Malmesbury", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9PW", "X-coordinate": "401600", "Y-coordinate": "190173", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/00404", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/01/2022", "Planning Application Withdrawn": "29/06/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.610387", "long": "-1.97829", "status": "planning", "mw": 47, "ext_id": "10488"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10488", "Record Last Updated (dd/mm/yyyy)": "28/01/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "11810", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dog Trap Lane, Minety, Malmesbury", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9PW", "X-coordinate": "401600", "Y-coordinate": "190173", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/00404", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/01/2022", "Planning Application Withdrawn": "29/06/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.610387", "long": "-1.97829", "status": "planning", "mw": 47, "ext_id": "10488"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 47, "mwh_is_estimate": true, "mwh": 47, "mwh_estimate": 47, "status": "planning", "status_class": "", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "name_short": "Dog Trap Lane, Minety - Battery Ene...", "owner": "Pelagic Energy", "state": "south west", "country": "uk", "lat": "51.610387", "long": "-1.97829", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.610387+-1.97829", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kenhardt 1-3", "city": "Kenhardt", "id": "693", "external_id": "", "state": "northern cape", "country": "south africa", "capacity_mwh": "1140", "estimate_mwh": "", "power_mw": "225", "customer": "", "owner": "", "developer": "scatec", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2022-10-05", "start_operation": "", "start_estimated": "", "cost_million": "1000", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "-29.345075", "long": "21.149171", "coords_hint": "3", "use_case": "540MW solar farm support", "notes": "those are 3 projects that will be built", "project_website": "https://scatec.com/locations/south-africa/#kenhardt-1-3-south-africa-540-mw", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "693", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 225, "mwh_is_estimate": false, "mwh": 1140, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2022-10-05", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kenhardt 1-3", "name_short": "Kenhardt 1-3", "owner": "", "state": "northern cape", "country": "south africa", "lat": "-29.345075", "long": "21.149171", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-29.345075+21.149171", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["those are 3 projects that will be built"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tollgate Battery Storage Facility", "city": "", "id": "726", "external_id": "6949", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "726", "external_id": "6949", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tollgate Battery Storage Facility", "external_id": "6949", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RNA Energy", "status": "planning", "date_first_heard": "2018-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.735231", "long": "-0.237166", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6949", "Record Last Updated (dd/mm/yyyy)": "23/11/2018", "Operator (or Applicant)": "RNA Energy", "Site Name": "Tollgate Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7335", "Are they re-applying (Old REPD Ref) ": "", "Address": "Tollgate Farm, Tollgate Road, North Mymms", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "AL4 0NY", "X-coordinate": "521828", "Y-coordinate": "205528", "Planning Authority": "Welwyn Hatfield Borough Council", "Planning Application Reference": "6/2017/0702/MAJ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "06/07/2017", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.735231", "long": "-0.237166", "status": "planning", "mw": 49, "ext_id": "6949"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2018", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/11/2018", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6949", "Record Last Updated (dd/mm/yyyy)": "23/11/2018", "Operator (or Applicant)": "RNA Energy", "Site Name": "Tollgate Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7335", "Are they re-applying (Old REPD Ref) ": "", "Address": "Tollgate Farm, Tollgate Road, North Mymms", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "AL4 0NY", "X-coordinate": "521828", "Y-coordinate": "205528", "Planning Authority": "Welwyn Hatfield Borough Council", "Planning Application Reference": "6/2017/0702/MAJ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "06/07/2017", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.735231", "long": "-0.237166", "status": "planning", "mw": 49, "ext_id": "6949"}, "current_month": "2024-01", "dates": {"first_heard": "2018-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2018-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tollgate Battery Storage Facility", "name_short": "Tollgate", "owner": "RNA Energy", "state": "eastern", "country": "uk", "lat": "51.735231", "long": "-0.237166", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.735231+-0.237166", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Breach Farm", "city": "", "id": "727", "external_id": "6962", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Hedge Energy Barn", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "727", "external_id": "6962", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Breach Farm", "external_id": "6962", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Green Hedge Energy Barn", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.76666", "long": "-1.609715", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6962", "Record Last Updated (dd/mm/yyyy)": "27/05/2022", "Operator (or Applicant)": "Green Hedge Energy Barn", "Site Name": "Breach Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "6914", "Are they re-applying (Old REPD Ref) ": "", "Address": "Breach Farm, Cadley Lane, Caldwell, Swadlincote,", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE12 6RJ", "X-coordinate": "426431", "Y-coordinate": "318856", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "9/2017/0154", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/02/2017", "Planning Application Withdrawn": "05/05/2017", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.76666", "long": "-1.609715", "status": "planning", "mw": 40, "ext_id": "6962"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/05/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6962", "Record Last Updated (dd/mm/yyyy)": "27/05/2022", "Operator (or Applicant)": "Green Hedge Energy Barn", "Site Name": "Breach Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "6914", "Are they re-applying (Old REPD Ref) ": "", "Address": "Breach Farm, Cadley Lane, Caldwell, Swadlincote,", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "DE12 6RJ", "X-coordinate": "426431", "Y-coordinate": "318856", "Planning Authority": "South Derbyshire District Council", "Planning Application Reference": "9/2017/0154", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/02/2017", "Planning Application Withdrawn": "05/05/2017", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.76666", "long": "-1.609715", "status": "planning", "mw": 40, "ext_id": "6962"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Breach Farm", "name_short": "Breach Farm", "owner": "Green Hedge Energy Barn", "state": "east midlands", "country": "uk", "lat": "52.76666", "long": "-1.609715", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.76666+-1.609715", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hilfield Farm Tech", "city": "", "id": "728", "external_id": "7030", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "728", "external_id": "7030", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hilfield Farm Tech", "external_id": "7030", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Capbal", "status": "planning", "date_first_heard": "2020-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.656597", "long": "-0.340365", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7030", "Record Last Updated (dd/mm/yyyy)": "26/03/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Hilfield Farm Tech", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8065", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hilfield Farm Hilfield Lane Aldenham Watford ", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "WD25 8DD", "X-coordinate": "514901", "Y-coordinate": "196616", "Planning Authority": "Hertsmere Borough Council", "Planning Application Reference": "18/1587/OUT ", "Appeal Reference": "APP/N1920/W/19/3240825", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "28/05/2019", "Appeal Lodged": "13/11/2019", "Appeal Withdrawn": "", "Appeal Refused": "24/03/2020", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.656597", "long": "-0.340365", "status": "planning", "mw": 49, "ext_id": "7030"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/03/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "26/03/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7030", "Record Last Updated (dd/mm/yyyy)": "26/03/2020", "Operator (or Applicant)": "Capbal", "Site Name": "Hilfield Farm Tech", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8065", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hilfield Farm Hilfield Lane Aldenham Watford ", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "WD25 8DD", "X-coordinate": "514901", "Y-coordinate": "196616", "Planning Authority": "Hertsmere Borough Council", "Planning Application Reference": "18/1587/OUT ", "Appeal Reference": "APP/N1920/W/19/3240825", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "28/05/2019", "Appeal Lodged": "13/11/2019", "Appeal Withdrawn": "", "Appeal Refused": "24/03/2020", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.656597", "long": "-0.340365", "status": "planning", "mw": 49, "ext_id": "7030"}, "current_month": "2024-01", "dates": {"first_heard": "2020-03-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2020-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hilfield Farm Tech", "name_short": "Hilfield Farm Tech", "owner": "Capbal", "state": "eastern", "country": "uk", "lat": "51.656597", "long": "-0.340365", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.656597+-0.340365", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lackenby", "city": "", "id": "729", "external_id": "7040", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "729", "external_id": "7040", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lackenby", "external_id": "7040", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2017-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.566653", "long": "-1.125293", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7040", "Record Last Updated (dd/mm/yyyy)": "23/07/2019", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Lackenby", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7518", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at, Crow Lane, Old Lackenby, Middlesbrough", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8DN", "X-coordinate": "456654", "Y-coordinate": "519399", "Planning Authority": "Redcar and Cleveland Borough Council", "Planning Application Reference": "R/2017/0564/FF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.566653", "long": "-1.125293", "status": "planning", "mw": 49, "ext_id": "7040"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/07/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "23/07/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7040", "Record Last Updated (dd/mm/yyyy)": "23/07/2019", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Lackenby", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7518", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at, Crow Lane, Old Lackenby, Middlesbrough", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8DN", "X-coordinate": "456654", "Y-coordinate": "519399", "Planning Authority": "Redcar and Cleveland Borough Council", "Planning Application Reference": "R/2017/0564/FF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.566653", "long": "-1.125293", "status": "planning", "mw": 49, "ext_id": "7040"}, "current_month": "2024-01", "dates": {"first_heard": "2019-07-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2017-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lackenby", "name_short": "Lackenby", "owner": "EDF Energy Renewables", "state": "north east", "country": "uk", "lat": "54.566653", "long": "-1.125293", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.566653+-1.125293", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lovedean Energy Storage System", "city": "", "id": "730", "external_id": "7064", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "730", "external_id": "7064", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lovedean Energy Storage System", "external_id": "7064", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco", "status": "planning", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.915038", "long": "-1.041344", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7064", "Record Last Updated (dd/mm/yyyy)": "16/05/2019", "Operator (or Applicant)": "Anesco", "Site Name": "Lovedean Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9257", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land S/O Lovedean Electricity, Broadway Lane, Lovedean, Land west of, Waterlooville, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO8 0SG", "X-coordinate": "467489", "Y-coordinate": "113279", "Planning Authority": "East Hampshire District Council", "Planning Application Reference": "57524/001", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "07/09/2018", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "02/10/2018", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.915038", "long": "-1.041344", "status": "planning", "mw": 49, "ext_id": "7064"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/05/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "16/05/2019", "extra": "", "change_type": "misc"}, {"name": "Judicial Review", "from": "07/09/2018", "to": "43350", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7064", "Record Last Updated (dd/mm/yyyy)": "16/05/2019", "Operator (or Applicant)": "Anesco", "Site Name": "Lovedean Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9257", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land S/O Lovedean Electricity, Broadway Lane, Lovedean, Land west of, Waterlooville, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO8 0SG", "X-coordinate": "467489", "Y-coordinate": "113279", "Planning Authority": "East Hampshire District Council", "Planning Application Reference": "57524/001", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "43350", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "02/10/2018", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.915038", "long": "-1.041344", "status": "planning", "mw": 49, "ext_id": "7064"}, "current_month": "2024-01", "dates": {"first_heard": "2019-05-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lovedean Energy Storage System", "name_short": "Lovedean", "owner": "Anesco", "state": "south east", "country": "uk", "lat": "50.915038", "long": "-1.041344", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.915038+-1.041344", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Gloucestershire Science and Technology Park (small)", "city": "", "id": "731", "external_id": "7181", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "731", "external_id": "7181", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gloucestershire Science and Technology Park (small)", "external_id": "7181", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "Ecotricity", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.689953", "long": "-2.498942", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7181", "Record Last Updated (dd/mm/yyyy)": "14/03/2022", "Operator (or Applicant)": "Ecotricity", "Site Name": "Gloucestershire Science and Technology Park (small)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10796", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hamfield Lane, Berkeley,", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL13 9FB", "X-coordinate": "365607", "Y-coordinate": "199140", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.17/2430/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.689953", "long": "-2.498942", "status": "planning", "mw": 32, "ext_id": "7181"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "14/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7181", "Record Last Updated (dd/mm/yyyy)": "14/03/2022", "Operator (or Applicant)": "Ecotricity", "Site Name": "Gloucestershire Science and Technology Park (small)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "10796", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hamfield Lane, Berkeley,", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL13 9FB", "X-coordinate": "365607", "Y-coordinate": "199140", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.17/2430/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/04/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/12/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.689953", "long": "-2.498942", "status": "planning", "mw": 32, "ext_id": "7181"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "planning", "status_class": "", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Gloucestershire Science and Technology Park (small)", "name_short": "Gloucestershire Science and Technol...", "owner": "Ecotricity", "state": "south west", "country": "uk", "lat": "51.689953", "long": "-2.498942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.689953+-2.498942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordtown Energy Storage", "city": "", "id": "732", "external_id": "7234", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Shires Hamilton", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "732", "external_id": "7234", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordtown Energy Storage", "external_id": "7234", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Shires Hamilton", "status": "planning", "date_first_heard": "2019-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7234", "Record Last Updated (dd/mm/yyyy)": "30/06/2020", "Operator (or Applicant)": "Shires Hamilton", "Site Name": "Fordtown Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7764", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2019/0373", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/03/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/08/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/08/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 20, "ext_id": "7234"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2020", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/08/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7234", "Record Last Updated (dd/mm/yyyy)": "20/08/2019", "Operator (or Applicant)": "Shires Hamilton", "Site Name": "Fordtown Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7764", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fordtown, Kintore, Inverurie, Grampian", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XJ", "X-coordinate": "377990", "Y-coordinate": "814576", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2019/0373", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/03/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/08/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/08/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.221396", "long": "-2.366114", "status": "planning", "mw": 20, "ext_id": "7234"}, "current_month": "2024-01", "dates": {"first_heard": "2020-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2019-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordtown Energy Storage", "name_short": "Fordtown", "owner": "Shires Hamilton", "state": "scotland", "country": "uk", "lat": "57.221396", "long": "-2.366114", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.221396+-2.366114", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tiddlywink Barn", "city": "", "id": "733", "external_id": "7527", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "McBallester", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "733", "external_id": "7527", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tiddlywink Barn", "external_id": "7527", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "McBallester", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.480148", "long": "-2.184011", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7527", "Record Last Updated (dd/mm/yyyy)": "20/12/2019", "Operator (or Applicant)": "McBallester", "Site Name": "Tiddlywink Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9552", "Are they re-applying (Old REPD Ref) ": "7073", "Address": "The Barn South East Of, 8 Tiddly Wink, Yatton Keynell, Chippenham, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14 7BY", "X-coordinate": "387318", "Y-coordinate": "175704", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/06775/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2019", "Planning Application Withdrawn": "10/09/2019", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.480148", "long": "-2.184011", "status": "planning", "mw": 10, "ext_id": "7527"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/12/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "20/12/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7527", "Record Last Updated (dd/mm/yyyy)": "20/12/2019", "Operator (or Applicant)": "McBallester", "Site Name": "Tiddlywink Barn", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "9552", "Are they re-applying (Old REPD Ref) ": "7073", "Address": "The Barn South East Of, 8 Tiddly Wink, Yatton Keynell, Chippenham, ", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14 7BY", "X-coordinate": "387318", "Y-coordinate": "175704", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "19/06775/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/07/2019", "Planning Application Withdrawn": "10/09/2019", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.480148", "long": "-2.184011", "status": "planning", "mw": 10, "ext_id": "7527"}, "current_month": "2024-01", "dates": {"first_heard": "2019-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tiddlywink Barn", "name_short": "Tiddlywink Barn", "owner": "McBallester", "state": "south west", "country": "uk", "lat": "51.480148", "long": "-2.184011", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.480148+-2.184011", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitminster - Solar Farm & Battery Storage", "city": "", "id": "734", "external_id": "8844", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects 7 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "734", "external_id": "8844", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Moreton Lane - Solar Farm & Battery Storage", "external_id": "8844", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "JBM Solar Projects 7 Limited", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.795091", "long": "-2.312848", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8844", "Record Last Updated (dd/mm/yyyy)": "28/04/2022", "Operator (or Applicant)": "JBM Solar Projects 7 Limited", "Site Name": "Whitminster - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8843", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Parcels A & B Near Whitminster Gloucestershire", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7PN", "X-coordinate": "378521", "Y-coordinate": "210762", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.21/0465/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.795091", "long": "-2.312848", "status": "planning", "mw": 49, "ext_id": "8844"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "05/04/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Site Name", "from": "Whitminster - Solar Farm & Battery Storage", "to": "Moreton Lane - Solar Farm & Battery Storage", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8844", "Record Last Updated (dd/mm/yyyy)": "28/04/2022", "Operator (or Applicant)": "JBM Solar Projects 7 Limited", "Site Name": "Moreton Lane - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8843", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Parcels A & B Near Whitminster Gloucestershire", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7PN", "X-coordinate": "378521", "Y-coordinate": "210762", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.21/0465/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/04/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.795091", "long": "-2.312848", "status": "planning", "mw": 49, "ext_id": "8844"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Moreton Lane - Solar Farm & Battery Storage", "name_short": "Moreton Lane - Solar Farm &", "owner": "JBM Solar Projects 7 Limited", "state": "south west", "country": "uk", "lat": "51.795091", "long": "-2.312848", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.795091+-2.312848", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "East Kilbride - Battery storage", "city": "", "id": "735", "external_id": "9013", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Cathkin Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "735", "external_id": "9013", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Kilbride - Battery storage", "external_id": "9013", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Engie Regeneration Limited", "status": "planning", "date_first_heard": "2022-08-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.333568", "long": "-3.444319", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9013", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Cathkin Energy Storage Limited", "Site Name": "East Kilbride - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North E/O East Kilbride, 275kv Grid Substation, Cairnmuir Road, East Kilbride, Moffat", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "308476", "Y-coordinate": "605341", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/22/0472", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.333568", "long": "-3.444319", "status": "planning", "mw": 49, "ext_id": "9013"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "04/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "22/08/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/08/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/11/2022", "to": "15/12/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Cathkin Energy Storage Limited", "to": "Engie Regeneration Limited", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9013", "Record Last Updated (dd/mm/yyyy)": "15/12/2023", "Operator (or Applicant)": "Engie Regeneration Limited", "Site Name": "East Kilbride - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North E/O East Kilbride, 275kv Grid Substation, Cairnmuir Road, East Kilbride, Moffat", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "308476", "Y-coordinate": "605341", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/22/0472", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.333568", "long": "-3.444319", "status": "planning", "mw": 49, "ext_id": "9013"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-08-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Kilbride - Battery storage", "name_short": "East Kilbride", "owner": "Engie Regeneration Limited", "state": "scotland", "country": "uk", "lat": "55.333568", "long": "-3.444319", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.333568+-3.444319", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Devilla Energy Storage Facility", "city": "", "id": "736", "external_id": "9248", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "736", "external_id": "9248", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Devilla Energy Storage Facility", "external_id": "9248", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Alcemi Storage Development Limited", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.131264", "long": "-3.782862", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9248", "Record Last Updated (dd/mm/yyyy)": "24/05/2022", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Devilla Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Devilla Forest, Kincardine, Alloa", "County": "Clackmannanshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK10", "X-coordinate": "289286", "Y-coordinate": "694603", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003469", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.131264", "long": "-3.782862", "status": "planning", "mw": 500, "ext_id": "9248"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2022", "to": "09/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/12/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9248", "Record Last Updated (dd/mm/yyyy)": "09/01/2024", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Devilla Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Devilla Forest, Kincardine, Alloa", "County": "Clackmannanshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK10", "X-coordinate": "289286", "Y-coordinate": "694603", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003469", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/12/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.131264", "long": "-3.782862", "status": "planning", "mw": 500, "ext_id": "9248"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Devilla Energy Storage Facility", "name_short": "Devilla Energy", "owner": "Alcemi Storage Development Limited", "state": "scotland", "country": "uk", "lat": "56.131264", "long": "-3.782862", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.131264+-3.782862", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hales Lane - Battery Storage Facility", "city": "", "id": "737", "external_id": "9635", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "737", "external_id": "9635", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hales Lane - Battery Storage Facility", "external_id": "9635", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Aura Power ", "status": "planning", "date_first_heard": "2022-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.725882", "long": "-0.984842", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9635", "Record Last Updated (dd/mm/yyyy)": "19/05/2022", "Operator (or Applicant)": "Aura Power ", "Site Name": "Hales Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hales Lane, Drax, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PL", "X-coordinate": "467078", "Y-coordinate": "425976", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/1089/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.725882", "long": "-0.984842", "status": "planning", "mw": 100, "ext_id": "9635"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9635", "Record Last Updated (dd/mm/yyyy)": "19/05/2022", "Operator (or Applicant)": "Aura Power ", "Site Name": "Hales Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hales Lane, Drax, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PL", "X-coordinate": "467078", "Y-coordinate": "425976", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/1089/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.725882", "long": "-0.984842", "status": "planning", "mw": 100, "ext_id": "9635"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hales Lane - Battery Storage Facility", "name_short": "Hales Lane", "owner": "Aura Power ", "state": "yorkshire and humber", "country": "uk", "lat": "53.725882", "long": "-0.984842", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.725882+-0.984842", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drum Farm - Battery Energy Storage System", "city": "", "id": "738", "external_id": "9940", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy System Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "738", "external_id": "9940", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drum Farm - Battery Energy Storage System", "external_id": "9940", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Renewable Energy System Limited", "status": "planning", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.542968", "long": "-2.929822", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9940", "Record Last Updated (dd/mm/yyyy)": "18/05/2022", "Operator (or Applicant)": "Renewable Energy System Limited", "Site Name": "Drum Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Drum Farm, Keith", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NP", "X-coordinate": "344439", "Y-coordinate": "850697", "Planning Authority": "Moray Council", "Planning Application Reference": "22/00715/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.542968", "long": "-2.929822", "status": "planning", "mw": 49, "ext_id": "9940"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2022", "to": "22/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "27/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/10/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/11/2022", "to": "17/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9940", "Record Last Updated (dd/mm/yyyy)": "17/11/2021", "Operator (or Applicant)": "Renewable Energy System Limited", "Site Name": "Drum Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Drum Farm, Keith", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NP", "X-coordinate": "344439", "Y-coordinate": "850697", "Planning Authority": "Moray Council", "Planning Application Reference": "22/00715/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/10/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.542968", "long": "-2.929822", "status": "planning", "mw": 49, "ext_id": "9940"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drum Farm - Battery Energy Storage System", "name_short": "Drum Farm - Battery", "owner": "Renewable Energy System Limited", "state": "scotland", "country": "uk", "lat": "57.542968", "long": "-2.929822", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.542968+-2.929822", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkhaw Lane - Battery Storage", "city": "", "id": "739", "external_id": "10145", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "739", "external_id": "10145", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkhaw Lane - Battery Storage", "external_id": "10145", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "status": "planning", "date_first_heard": "2022-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.717709", "long": "-1.27556", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10145", "Record Last Updated (dd/mm/yyyy)": "04/03/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "Site Name": "Kirkhaw Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8430", "Address": "Industrial Pallet & Transport Services Kirkhaw Lane Knottingley ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447906", "Y-coordinate": "424832", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02937/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.717709", "long": "-1.27556", "status": "planning", "mw": 32, "ext_id": "10145"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "28/02/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/03/2022", "to": "19/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10145", "Record Last Updated (dd/mm/yyyy)": "19/01/2022", "Operator (or Applicant)": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "Site Name": "Kirkhaw Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8430", "Address": "Industrial Pallet & Transport Services Kirkhaw Lane Knottingley ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8RD", "X-coordinate": "447906", "Y-coordinate": "424832", "Planning Authority": "Wakefield Metropolitan District Council", "Planning Application Reference": "21/02937/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/02/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/02/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.717709", "long": "-1.27556", "status": "planning", "mw": 32, "ext_id": "10145"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "planning", "status_class": "", "date_first_heard": "2022-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkhaw Lane - Battery Storage", "name_short": "Kirkhaw Lane", "owner": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.717709", "long": "-1.27556", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.717709+-1.27556", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newburgh Road, Abernethy - Battery Storage ", "city": "", "id": "741", "external_id": "10607", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "P & M Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "741", "external_id": "10607", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newburgh Road, Abernethy - Battery Storage ", "external_id": "10607", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "P & M Energy Limited", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10607", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "P & M Energy Limited", "Site Name": "Newburgh Road, Abernethy - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "60 Metres North Of Abernethy Cemetery Newburgh Road Abernethy ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/00746/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "planning", "mw": 49, "ext_id": "10607"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2022", "to": "25/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "26/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "26/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/10/2022", "to": "11/02/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10607", "Record Last Updated (dd/mm/yyyy)": "11/02/2022", "Operator (or Applicant)": "P & M Energy Limited", "Site Name": "Newburgh Road, Abernethy - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "60 Metres North Of Abernethy Cemetery Newburgh Road Abernethy ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/00746/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "planning", "mw": 49, "ext_id": "10607"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newburgh Road, Abernethy - Battery Storage ", "name_short": "Newburgh Road, Abernethy - Battery ...", "owner": "P & M Energy Limited", "state": "scotland", "country": "uk", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.347678+-3.298351", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Sleekburn - Battery Storage Compound", "city": "", "id": "743", "external_id": "10957", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Enviromena Asset Management UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "743", "external_id": "10957", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Sleekburn - Battery Storage Compound", "external_id": "10957", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Enviromena Asset Management UK Limited", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.157567", "long": "-1.544096", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10957", "Record Last Updated (dd/mm/yyyy)": "29/06/2022", "Operator (or Applicant)": "Enviromena Asset Management UK Limited", "Site Name": "West Sleekburn - Battery Storage Compound", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Sleekburn, Bedlington", "County": "Northumberland", "Region": "North East", "Country": "England", "Post Code": "NE22 7DB ", "X-coordinate": "429148", "Y-coordinate": "584899", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "22/01725/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.157567", "long": "-1.544096", "status": "planning", "mw": 30, "ext_id": "10957"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/06/2022", "to": "21/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "19/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "19/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/10/2022", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10957", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Enviromena Asset Management UK Limited", "Site Name": "West Sleekburn - Battery Storage Compound", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Sleekburn, Bedlington", "County": "Northumberland", "Region": "North East", "Country": "England", "Post Code": "NE22 7DB ", "X-coordinate": "429148", "Y-coordinate": "584899", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "22/01725/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.157567", "long": "-1.544096", "status": "planning", "mw": 30, "ext_id": "10957"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Sleekburn - Battery Storage Compound", "name_short": "West Sleekburn - Battery Storage Co...", "owner": "Enviromena Asset Management UK Limited", "state": "north east", "country": "uk", "lat": "55.157567", "long": "-1.544096", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.157567+-1.544096", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Maybrook Road - Battery facility", "city": "", "id": "744", "external_id": "11008", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Conrad Energy (Develeopments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "744", "external_id": "11008", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Maybrook Road - Battery facility", "external_id": "11008", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "Conrad Energy (Develeopments) Limited", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.529587", "long": "-1.788339", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11008", "Record Last Updated (dd/mm/yyyy)": "19/04/2022", "Operator (or Applicant)": "Conrad Energy (Develeopments) Limited", "Site Name": "Maybrook Road - Battery facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13.1", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Maybrook Business Park - Unit 6 Maybrook Road Sutton Coldfield ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B76 1AL\ufffd", "X-coordinate": "414456", "Y-coordinate": "292434", "Planning Authority": "Birmingham City Council", "Planning Application Reference": "2022/01927/PA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.529587", "long": "-1.788339", "status": "planning", "mw": 13, "ext_id": "11008"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/04/2022", "to": "18/08/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/08/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/08/2022", "to": "19/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11008", "Record Last Updated (dd/mm/yyyy)": "19/04/2022", "Operator (or Applicant)": "Conrad Energy (Develeopments) Limited", "Site Name": "Maybrook Road - Battery facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13.1", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Maybrook Business Park - Unit 6 Maybrook Road Sutton Coldfield ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B76 1AL\ufffd", "X-coordinate": "414456", "Y-coordinate": "292434", "Planning Authority": "Birmingham City Council", "Planning Application Reference": "2022/01927/PA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.529587", "long": "-1.788339", "status": "planning", "mw": 13, "ext_id": "11008"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "planning", "status_class": "", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Maybrook Road - Battery facility", "name_short": "Maybrook Road - Battery facility", "owner": "Conrad Energy (Develeopments) Limited", "state": "west midlands", "country": "uk", "lat": "52.529587", "long": "-1.788339", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.529587+-1.788339", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "city": "", "id": "745", "external_id": "11092", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "745", "external_id": "11092", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "external_id": "11092", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Conrad Energy (Developments) Limited", "status": "planning", "date_first_heard": "2023-04-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.213221", "long": "-2.38143", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11092", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Conrad Energy (Developments) Limited", "Site Name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "450m Nw/O South Leylodge Farmhouse, Kintore", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XY", "X-coordinate": "377060", "Y-coordinate": "813671", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "ENQ/2022/0562 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.213221", "long": "-2.38143", "status": "planning", "mw": 49, "ext_id": "11092"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "11/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "ENQ/2022/0562 ", "to": "APP/2022/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "14/04/2022", "to": "30/09/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/10/2022", "to": "02/05/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/04/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/04/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/05/2023", "to": "27/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11092", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Conrad Energy (Developments) Limited", "Site Name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "450m Nw/O South Leylodge Farmhouse, Kintore", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XY", "X-coordinate": "377060", "Y-coordinate": "813671", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2022", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/04/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.213221", "long": "-2.38143", "status": "planning", "mw": 49, "ext_id": "11092"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-04-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "name_short": "South Leylodge Farmhouse, Kintore -...", "owner": "Conrad Energy (Developments) Limited", "state": "scotland", "country": "uk", "lat": "57.213221", "long": "-2.38143", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.213221+-2.38143", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tealing Battery Energy Storage Farm", "city": "", "id": "746", "external_id": "11097", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Sirius EcoDev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "746", "external_id": "11097", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tealing Battery Energy Storage Farm", "external_id": "11097", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Sirius EcoDev Limited", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.509108", "long": "-2.883199", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11097", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Sirius EcoDev Limited", "Site Name": "Tealing Battery Energy Storage Farm", "Technology Type": "Battery", "Storage Type": "", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "800m Ne/O Gagie Farm, Kellas", "County": "Angus ", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD5", "X-coordinate": "345741", "Y-coordinate": "735577", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003354", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.509108", "long": "-2.883199", "status": "planning", "mw": 80, "ext_id": "11097"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Type", "from": "", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/04/2022", "to": "29/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/11/2022", "to": "09/01/2024", "extra": "", "change_type": "misc"}, {"name": "Storage Type", "from": "Stand-alone Storage", "to": "Co-located with RE", "extra": "", "change_type": "misc"}, {"name": "Storage Co-location REPD Ref ID", "from": "", "to": "14543", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/12/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11097", "Record Last Updated (dd/mm/yyyy)": "09/01/2024", "Operator (or Applicant)": "Sirius EcoDev Limited", "Site Name": "Tealing Battery Energy Storage Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14543", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "800m Ne/O Gagie Farm, Kellas", "County": "Angus ", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD5", "X-coordinate": "345741", "Y-coordinate": "735577", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003354", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/12/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.509108", "long": "-2.883199", "status": "planning", "mw": 80, "ext_id": "11097"}, "current_month": "2024-01", "dates": {"first_heard": "2022-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tealing Battery Energy Storage Farm", "name_short": "Tealing Battery Energy Storage Far...", "owner": "Sirius EcoDev Limited", "state": "scotland", "country": "uk", "lat": "56.509108", "long": "-2.883199", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.509108+-2.883199", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grayside Wind Farm", "city": "", "id": "747", "external_id": "11113", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Grayside WF", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "747", "external_id": "11113", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grayside Wind Farm", "external_id": "11113", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Grayside WF", "status": "planning", "date_first_heard": "2022-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.538094", "long": "-3.589297", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11113", "Record Last Updated (dd/mm/yyyy)": "04/05/2022", "Operator (or Applicant)": "Grayside WF", "Site Name": "Grayside Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8003", "Installed Capacity (MWelec)": "20", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "7", "No. of Turbines": "21", "Height of Turbines (m)": "200", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Approximately 1.7km south of Lamington and 5.7km north east of Abington", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML12 6QD", "X-coordinate": "299800", "Y-coordinate": "628300", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003446", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.538094", "long": "-3.589297", "status": "planning", "mw": 20, "ext_id": "11113"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "CfD Capacity (MW)", "from": "", "to": "7", "extra": "", "change_type": "misc"}, {"name": "Turbine Capacity (MW)", "from": "7", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11113", "Record Last Updated (dd/mm/yyyy)": "04/05/2022", "Operator (or Applicant)": "Grayside WF", "Site Name": "Grayside Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8003", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "7", "Turbine Capacity (MW)": "", "No. of Turbines": "21", "Height of Turbines (m)": "200", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Approximately 1.7km south of Lamington and 5.7km north east of Abington", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML12 6QD", "X-coordinate": "299800", "Y-coordinate": "628300", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003446", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.538094", "long": "-3.589297", "status": "planning", "mw": 20, "ext_id": "11113"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grayside Wind Farm", "name_short": "Grayside Wind Farm", "owner": "Grayside WF", "state": "scotland", "country": "uk", "lat": "55.538094", "long": "-3.589297", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.538094+-3.589297", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chadderton - Battery energy storage facility", "city": "", "id": "748", "external_id": "11160", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Field", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-06-01", "start_construction": "2021-12-20", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "748", "external_id": "11160", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chadderton - Battery energy storage facility", "external_id": "11160", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Field", "status": "construction", "date_first_heard": "2022-06-01", "start_construction": "2021-12-20", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.531102", "long": "-2.166", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11160", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "Field", "Site Name": "Chadderton - Battery energy storage facility", "Technology Type": "Battery", "Storage Type": "", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Unit 12 Howarth Court Gateway Crescent Chadderton Oldham ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL9 9XB", "X-coordinate": "389094", "Y-coordinate": "403840", "Planning Authority": "Oldham Council", "Planning Application Reference": "FUL/348758/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "20/12/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.531102", "long": "-2.166", "status": "construction", "mw": 20, "ext_id": "11160"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Type", "from": "", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2022", "to": "09/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11160", "Record Last Updated (dd/mm/yyyy)": "09/05/2022", "Operator (or Applicant)": "Field", "Site Name": "Chadderton - Battery energy storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Unit 12 Howarth Court Gateway Crescent Chadderton Oldham ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL9 9XB", "X-coordinate": "389094", "Y-coordinate": "403840", "Planning Authority": "Oldham Council", "Planning Application Reference": "FUL/348758/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "20/12/2021", "Operational": "", "Heat Network Ref": "", "lat": "53.531102", "long": "-2.166", "status": "construction", "mw": 20, "ext_id": "11160"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-06-01", "start_construction": "2021-12-20", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chadderton - Battery energy storage facility", "name_short": "Chadderton - Battery energy", "owner": "Field", "state": "north west", "country": "uk", "lat": "53.531102", "long": "-2.166", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.531102+-2.166", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Richborough Energy Park - Phase 3", "city": "", "id": "749", "external_id": "11201", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "249", "power_mw": "249", "customer": "", "owner": "Sheaf Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "749", "external_id": "11201", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Richborough Energy Park - Phase 3 (Sheaf)", "external_id": "11201", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 249, "power_mw": 249, "owner": "Pacific Green", "status": "planning", "date_first_heard": "2022-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.31203", "long": "1.346823", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11201", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Sheaf Energy Limited", "Site Name": "Richborough Energy Park - Phase 3", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "249", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Richborough Energy Park, Sandwich Road, Ramsgate, Sandwich", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633341", "Y-coordinate": "162310", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/22/0579", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.31203", "long": "1.346823", "status": "planning", "mw": 249, "ext_id": "11201"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/05/2022", "to": "22/05/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Sheaf Energy Limited", "to": "Pacific Green", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "22/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/05/2023", "to": "10/05/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Richborough Energy Park - Phase 3", "to": "Richborough Energy Park - Phase 3 (Sheaf)", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11201", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Pacific Green", "Site Name": "Richborough Energy Park - Phase 3 (Sheaf)", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "249", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Richborough Energy Park, Sandwich Road, Ramsgate, Sandwich", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9NL", "X-coordinate": "633341", "Y-coordinate": "162310", "Planning Authority": "Thanet District Council", "Planning Application Reference": "F/TH/22/0579", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.31203", "long": "1.346823", "status": "planning", "mw": 249, "ext_id": "11201"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 249, "mwh_is_estimate": true, "mwh": 249, "mwh_estimate": 249, "status": "planning", "status_class": "", "date_first_heard": "2022-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Richborough Energy Park - Phase 3 (Sheaf)", "name_short": "Richborough Energy Park - Phase 3 (...", "owner": "Pacific Green", "state": "south east", "country": "uk", "lat": "51.31203", "long": "1.346823", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.31203+1.346823", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stocking Pelham - Battery Storage System", "city": "", "id": "750", "external_id": "11212", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Connections", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "750", "external_id": "11212", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stocking Pelham - Battery Storage System", "external_id": "11212", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Renewable Connections", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.939595", "long": "0.1177", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11212", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Renewable Connections", "Site Name": "Stocking Pelham - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Crabbs Lane And Pelham Substation Stocking Pelham ", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG9", "X-coordinate": "545670", "Y-coordinate": "228906", "Planning Authority": "East Hertfordshire Council", "Planning Application Reference": "3/22/0806/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.939595", "long": "0.1177", "status": "planning", "mw": 50, "ext_id": "11212"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11212", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Renewable Connections", "Site Name": "Stocking Pelham - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Crabbs Lane And Pelham Substation Stocking Pelham ", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "SG9", "X-coordinate": "545670", "Y-coordinate": "228906", "Planning Authority": "East Hertfordshire Council", "Planning Application Reference": "3/22/0806/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.939595", "long": "0.1177", "status": "planning", "mw": 50, "ext_id": "11212"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stocking Pelham - Battery Storage System", "name_short": "Stocking Pelham - Battery Storage S...", "owner": "Renewable Connections", "state": "eastern", "country": "uk", "lat": "51.939595", "long": "0.1177", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.939595+0.1177", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penwortham - Battery storage", "city": "", "id": "751", "external_id": "11217", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "751", "external_id": "11217", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penwortham - Battery storage", "external_id": "11217", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Shaw-Energi Limited", "status": "planning", "date_first_heard": "2022-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.746613", "long": "-2.756297", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11217", "Record Last Updated (dd/mm/yyyy)": "24/05/2022", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "Penwortham - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Sub Station 210M From National Grid Sub Station, Howick Cross Lane 4M From Unn Howick Cross Lane Penwortham", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR1 0NS", "X-coordinate": "350221", "Y-coordinate": "428070", "Planning Authority": "South Ribble Borough Council", "Planning Application Reference": "07/2022/00021/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.746613", "long": "-2.756297", "status": "planning", "mw": 57, "ext_id": "11217"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/05/2025", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/05/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "10/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11217", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "Penwortham - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Sub Station 210M From National Grid Sub Station, Howick Cross Lane 4M From Unn Howick Cross Lane Penwortham", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR1 0NS", "X-coordinate": "350221", "Y-coordinate": "428070", "Planning Authority": "South Ribble Borough Council", "Planning Application Reference": "07/2022/00021/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/04/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/05/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.746613", "long": "-2.756297", "status": "planning", "mw": 57, "ext_id": "11217"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2022-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penwortham - Battery storage", "name_short": "Penwortham", "owner": "Shaw-Energi Limited", "state": "north west", "country": "uk", "lat": "53.746613", "long": "-2.756297", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.746613+-2.756297", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Armadale Wind Farm", "city": "", "id": "752", "external_id": "11219", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Brookfield Renewable UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "752", "external_id": "11219", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Armadale Wind Farm", "external_id": "11219", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 42, "power_mw": 42, "owner": "Brookfield Renewable UK", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.53475", "long": "-4.076945", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11219", "Record Last Updated (dd/mm/yyyy)": "18/05/2022", "Operator (or Applicant)": "Brookfield Renewable UK", "Site Name": "Armadale Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6362", "Installed Capacity (MWelec)": "42", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 1100M South Of, Armadale Farm, Armadale, Thurso, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7SA", "X-coordinate": "279177", "Y-coordinate": "962608", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003455", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.53475", "long": "-4.076945", "status": "planning", "mw": 42, "ext_id": "11219"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2022", "to": "10/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11219", "Record Last Updated (dd/mm/yyyy)": "10/05/2022", "Operator (or Applicant)": "Brookfield Renewable UK", "Site Name": "Armadale Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6362", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land 1100M South Of, Armadale Farm, Armadale, Thurso, ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7SA", "X-coordinate": "279177", "Y-coordinate": "962608", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003455", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.53475", "long": "-4.076945", "status": "planning", "mw": 42, "ext_id": "11219"}, "current_month": "2024-01", "dates": {"first_heard": "2022-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 42, "mwh_is_estimate": true, "mwh": 42, "mwh_estimate": 42, "status": "planning", "status_class": "", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Armadale Wind Farm", "name_short": "Armadale Wind Farm", "owner": "Brookfield Renewable UK", "state": "scotland", "country": "uk", "lat": "58.53475", "long": "-4.076945", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.53475+-4.076945", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bath Mews, Minsterley - 10MW Battery Storage Facility", "city": "", "id": "753", "external_id": "11369", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "753", "external_id": "11369", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bath Mews, Minsterley - Battery Storage Facility", "external_id": "11369", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Hydrock Consultants Limited", "status": "planning", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.639388", "long": "-2.925161", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11369", "Record Last Updated (dd/mm/yyyy)": "21/03/2023", "Operator (or Applicant)": "Hydrock Consultants Limited", "Site Name": "Bath Mews, Minsterley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13480", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Bath Mews, Minsterley, Shrewsbury", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "SY5 0BA", "X-coordinate": "337492", "Y-coordinate": "305029", "Planning Authority": "Shropshire Council", "Planning Application Reference": "22/01897/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "01/11/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.639388", "long": "-2.925161", "status": "planning", "mw": 10, "ext_id": "11369"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/03/2023", "to": "27/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11369", "Record Last Updated (dd/mm/yyyy)": "27/05/2022", "Operator (or Applicant)": "Hydrock Consultants Limited", "Site Name": "Bath Mews, Minsterley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13480", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Bath Mews, Minsterley, Shrewsbury", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "SY5 0BA", "X-coordinate": "337492", "Y-coordinate": "305029", "Planning Authority": "Shropshire Council", "Planning Application Reference": "22/01897/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "01/11/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.639388", "long": "-2.925161", "status": "planning", "mw": 10, "ext_id": "11369"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bath Mews, Minsterley - Battery Storage Facility", "name_short": "Bath Mews, Minsterley", "owner": "Hydrock Consultants Limited", "state": "west midlands", "country": "uk", "lat": "52.639388", "long": "-2.925161", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.639388+-2.925161", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lowlands Farm - Battery Storage", "city": "", "id": "754", "external_id": "11399", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "754", "external_id": "11399", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lowlands Farm - Battery Storage", "external_id": "11399", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Anglo Renewables", "status": "planning", "date_first_heard": "2023-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.432555", "long": "-2.026549", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11399", "Record Last Updated (dd/mm/yyyy)": "04/01/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Lowlands Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12959", "Are they re-applying (Old REPD Ref) ": "", "Address": "adj to M5 Motorway, Lowlands Farm, Illey Lane, Halesowen", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B62 0HJ", "X-coordinate": "398292", "Y-coordinate": "281620", "Planning Authority": "Dudley Council", "Planning Application Reference": "P22/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/08/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.432555", "long": "-2.026549", "status": "planning", "mw": 50, "ext_id": "11399"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/01/2023", "to": "06/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11399", "Record Last Updated (dd/mm/yyyy)": "06/06/2022", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Lowlands Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12959", "Are they re-applying (Old REPD Ref) ": "", "Address": "adj to M5 Motorway, Lowlands Farm, Illey Lane, Halesowen", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B62 0HJ", "X-coordinate": "398292", "Y-coordinate": "281620", "Planning Authority": "Dudley Council", "Planning Application Reference": "P22/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/08/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.432555", "long": "-2.026549", "status": "planning", "mw": 50, "ext_id": "11399"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lowlands Farm - Battery Storage", "name_short": "Lowlands Farm", "owner": "Anglo Renewables", "state": "west midlands", "country": "uk", "lat": "52.432555", "long": "-2.026549", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.432555+-2.026549", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Patch Elm Lane - Battery Storage ", "city": "", "id": "755", "external_id": "11415", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "755", "external_id": "11415", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Patch Elm Lane - Battery Storage ", "external_id": "11415", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Green Frog Ventures Limited", "status": "planning", "date_first_heard": "2022-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.569394", "long": "-2.464667", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11415", "Record Last Updated (dd/mm/yyyy)": "30/03/2022", "Operator (or Applicant)": "Green Frog Ventures Limited", "Site Name": "Patch Elm Lane - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Patch Elm Lane Rangeworthy ", "County": "South Gloucestershire ", "Region": "South West", "Country": "England", "Post Code": "BS37 7LT", "X-coordinate": "367891", "Y-coordinate": "185716", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P21/07489/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569394", "long": "-2.464667", "status": "planning", "mw": 35, "ext_id": "11415"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "18/03/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11415", "Record Last Updated (dd/mm/yyyy)": "30/03/2022", "Operator (or Applicant)": "Green Frog Ventures Limited", "Site Name": "Patch Elm Lane - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Patch Elm Lane Rangeworthy ", "County": "South Gloucestershire ", "Region": "South West", "Country": "England", "Post Code": "BS37 7LT", "X-coordinate": "367891", "Y-coordinate": "185716", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P21/07489/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569394", "long": "-2.464667", "status": "planning", "mw": 35, "ext_id": "11415"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2022-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Patch Elm Lane - Battery Storage ", "name_short": "Patch Elm Lane - Battery Storage ", "owner": "Green Frog Ventures Limited", "state": "south west", "country": "uk", "lat": "51.569394", "long": "-2.464667", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.569394+-2.464667", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brown Edge - Battery Storage", "city": "", "id": "756", "external_id": "11418", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "756", "external_id": "11418", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Brown Edge - Battery Storage", "external_id": "11418", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.07567", "long": "-2.159837", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11418", "Record Last Updated (dd/mm/yyyy)": "18/03/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Brown Edge - Battery Storage", "Technology Type": "Battery", "Storage Type": "", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.53", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bemersley Road, Brown Edge, ", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST6", "X-coordinate": "389389", "Y-coordinate": "353172", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2022/0076", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.07567", "long": "-2.159837", "status": "planning", "mw": 49, "ext_id": "11418"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Type", "from": "", "to": "Stand-alone Storage", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/03/2021", "to": "03/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11418", "Record Last Updated (dd/mm/yyyy)": "03/11/2021", "Operator (or Applicant)": "Anesco", "Site Name": "Brown Edge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.53", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bemersley Road, Brown Edge, ", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST6", "X-coordinate": "389389", "Y-coordinate": "353172", "Planning Authority": "Staffordshire Moorlands District Council", "Planning Application Reference": "SMD/2022/0076", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.07567", "long": "-2.159837", "status": "planning", "mw": 49, "ext_id": "11418"}, "current_month": "2024-01", "dates": {"first_heard": "2021-03-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Brown Edge - Battery Storage", "name_short": "Brown Edge", "owner": "Anesco", "state": "west midlands", "country": "uk", "lat": "53.07567", "long": "-2.159837", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.07567+-2.159837", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Melton Electricity Substation - Energy Storage System", "city": "", "id": "757", "external_id": "11436", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "26", "customer": "", "owner": "Brampton Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "757", "external_id": "11436", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Melton Electricity Substation - Energy Storage System", "external_id": "11436", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 26, "power_mw": 26, "owner": "Brampton Energy Storage Limited", "status": "planning", "date_first_heard": "2022-09-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.500382", "long": "-1.380305", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11436", "Record Last Updated (dd/mm/yyyy)": "09/06/2022", "Operator (or Applicant)": "Brampton Energy Storage Limited", "Site Name": "West Melton Electricity Substation - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "26", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SW/O West Melton Electricity Substation Elsecar Road Brampton Bierlow", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S63 6EZ", "X-coordinate": "441204", "Y-coordinate": "400588", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/0853", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.500382", "long": "-1.380305", "status": "planning", "mw": 26, "ext_id": "11436"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/06/2022", "to": "23/09/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "13/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/09/2022", "to": "23/11/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11436", "Record Last Updated (dd/mm/yyyy)": "23/11/2023", "Operator (or Applicant)": "Brampton Energy Storage Limited", "Site Name": "West Melton Electricity Substation - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "26", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SW/O West Melton Electricity Substation Elsecar Road Brampton Bierlow", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S63 6EZ", "X-coordinate": "441204", "Y-coordinate": "400588", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/0853", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.500382", "long": "-1.380305", "status": "planning", "mw": 26, "ext_id": "11436"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 26, "mwh_is_estimate": true, "mwh": 26, "mwh_estimate": 26, "status": "planning", "status_class": "", "date_first_heard": "2022-09-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Melton Electricity Substation - Energy Storage System", "name_short": "West Melton Electricity Substation", "owner": "Brampton Energy Storage Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.500382", "long": "-1.380305", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.500382+-1.380305", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Teviot Wind Farm", "city": "", "id": "758", "external_id": "11442", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Muirhall Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "758", "external_id": "11442", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Teviot Wind Farm", "external_id": "11442", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Muirhall Energy Limited", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.342961", "long": "-2.939226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11442", "Record Last Updated (dd/mm/yyyy)": "10/06/2022", "Operator (or Applicant)": "Muirhall Energy Limited", "Site Name": "Teviot Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8921, 11441", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Teviot Wind Farm Land South, East And West Of Priesthaugh ", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD9", "X-coordinate": "340530", "Y-coordinate": "605838", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003249", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.342961", "long": "-2.939226", "status": "planning", "mw": 100, "ext_id": "11442"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Co-location REPD Ref ID", "from": "8921, 11441", "to": "8921 & 11441", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11442", "Record Last Updated (dd/mm/yyyy)": "10/06/2022", "Operator (or Applicant)": "Muirhall Energy Limited", "Site Name": "Teviot Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8921 & 11441", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Teviot Wind Farm Land South, East And West Of Priesthaugh ", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD9", "X-coordinate": "340530", "Y-coordinate": "605838", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003249", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.342961", "long": "-2.939226", "status": "planning", "mw": 100, "ext_id": "11442"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Teviot Wind Farm", "name_short": "Teviot Wind Farm", "owner": "Muirhall Energy Limited", "state": "scotland", "country": "uk", "lat": "55.342961", "long": "-2.939226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.342961+-2.939226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "city": "", "id": "759", "external_id": "11449", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harrington Franklin Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "759", "external_id": "11449", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "external_id": "11449", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harrington Franklin Limited", "status": "planning", "date_first_heard": "2022-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.306124", "long": "1.348574", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11449", "Record Last Updated (dd/mm/yyyy)": "14/06/2022", "Operator (or Applicant)": "Harrington Franklin Limited", "Site Name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Part Of Former Richborough Power Station Ramsgate Road ", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9DE", "X-coordinate": "633493", "Y-coordinate": "161659", "Planning Authority": "Dover District Council", "Planning Application Reference": "22/00705", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.306124", "long": "1.348574", "status": "planning", "mw": 49, "ext_id": "11449"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/06/2022", "to": "12/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/12/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "14/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11449", "Record Last Updated (dd/mm/yyyy)": "14/06/2022", "Operator (or Applicant)": "Harrington Franklin Limited", "Site Name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Part Of Former Richborough Power Station Ramsgate Road ", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "CT13 9DE", "X-coordinate": "633493", "Y-coordinate": "161659", "Planning Authority": "Dover District Council", "Planning Application Reference": "22/00705", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.306124", "long": "1.348574", "status": "planning", "mw": 49, "ext_id": "11449"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "name_short": "Harrington Franklin, Richborough En...", "owner": "Harrington Franklin Limited", "state": "south east", "country": "uk", "lat": "51.306124", "long": "1.348574", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.306124+1.348574", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "city": "", "id": "760", "external_id": "11482", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Elgin Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "760", "external_id": "11482", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "external_id": "11482", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Elgin Energy", "status": "planning", "date_first_heard": "2022-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.165997", "long": "-3.150531", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11482", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Elgin Energy", "Site Name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "", "Storage Co-location REPD Ref ID": "6383", "Installed Capacity (MWelec)": "25", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land adj. to former Nant-Y-Gwy, Landfill site, Pentre, Mid Glamorgan", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1 4BD", "X-coordinate": "328650", "Y-coordinate": "697633", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002222", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "24/05/2022", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.165997", "long": "-3.150531", "status": "planning", "mw": 25, "ext_id": "11482"}, "first_month": "2022-07", "changes": [{"month": "2022-10", "li": [{"name": "Storage Type", "from": "", "to": "Co-located with RE", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "24/05/2022", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Intervened", "from": "24/05/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "24/05/2027", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11482", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Elgin Energy", "Site Name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6383", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land adj. to former Nant-Y-Gwy, Landfill site, Pentre, Mid Glamorgan", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1 4BD", "X-coordinate": "328650", "Y-coordinate": "697633", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002222", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/05/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "24/05/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.165997", "long": "-3.150531", "status": "planning", "mw": 25, "ext_id": "11482"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "name_short": "Wemyss Estate - Randolph Solar Farm...", "owner": "Elgin Energy", "state": "scotland", "country": "uk", "lat": "56.165997", "long": "-3.150531", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.165997+-3.150531", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kingston Road, Slimbridge - Battery Storage", "city": "", "id": "763", "external_id": "11516", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Relay Slimbridge Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "763", "external_id": "11516", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kingston Road, Slimbridge - Battery Storage", "external_id": "11516", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 36, "power_mw": 36, "owner": "Relay Slimbridge Limited", "status": "planning", "date_first_heard": "2023-04-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.736447", "long": "-2.38398", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11516", "Record Last Updated (dd/mm/yyyy)": "22/06/2022", "Operator (or Applicant)": "Relay Slimbridge Limited", "Site Name": "Kingston Road, Slimbridge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North East Of Kingston Road Slimbridge ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7BN", "X-coordinate": "373581", "Y-coordinate": "204263", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.22/1157/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.736447", "long": "-2.38398", "status": "planning", "mw": 36, "ext_id": "11516"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "14882", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "26/04/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11516", "Record Last Updated (dd/mm/yyyy)": "22/06/2022", "Operator (or Applicant)": "Relay Slimbridge Limited", "Site Name": "Kingston Road, Slimbridge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14882", "Are they re-applying (Old REPD Ref) ": "", "Address": "North East Of Kingston Road Slimbridge ", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7BN", "X-coordinate": "373581", "Y-coordinate": "204263", "Planning Authority": "Stroud District Council", "Planning Application Reference": "S.22/1157/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/04/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.736447", "long": "-2.38398", "status": "planning", "mw": 36, "ext_id": "11516"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 36, "mwh_is_estimate": true, "mwh": 36, "mwh_estimate": 36, "status": "planning", "status_class": "", "date_first_heard": "2023-04-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kingston Road, Slimbridge - Battery Storage", "name_short": "Kingston Road, Slimbridge", "owner": "Relay Slimbridge Limited", "state": "south west", "country": "uk", "lat": "51.736447", "long": "-2.38398", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.736447+-2.38398", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Llwyn Onn - Solar Farm & Battery Storage", "city": "", "id": "764", "external_id": "11544", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "764", "external_id": "11544", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Little Llwyn Onn - Solar Farm & Battery Storage", "external_id": "11544", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "Novus Renewable Services Limited", "status": "planning", "date_first_heard": "2023-03-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.034175", "long": "-2.954379", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11544", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Little Llwyn Onn - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11543", "Installed Capacity (MWelec)": "16", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Llwyn Onn, Cefn Road, Llwyn Onn", "County": "Clwyd", "Region": "Wales", "Country": "Wales", "Post Code": "LL13 0NY", "X-coordinate": "336098", "Y-coordinate": "348970", "Planning Authority": "Wrexham County Borough Council", "Planning Application Reference": "P/2022/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.034175", "long": "-2.954379", "status": "planning", "mw": 16, "ext_id": "11544"}, "first_month": "2022-07", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/06/2022", "to": "14/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "08/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "08/03/2028", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/03/2023", "to": "24/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11544", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Little Llwyn Onn - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11543", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Llwyn Onn, Cefn Road, Llwyn Onn", "County": "Clwyd", "Region": "Wales", "Country": "Wales", "Post Code": "LL13 0NY", "X-coordinate": "336098", "Y-coordinate": "348970", "Planning Authority": "Wrexham County Borough Council", "Planning Application Reference": "P/2022/0541", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/03/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.034175", "long": "-2.954379", "status": "planning", "mw": 16, "ext_id": "11544"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2023-03-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Little Llwyn Onn - Solar Farm & Battery Storage", "name_short": "Little Llwyn Onn - Solar Farm &", "owner": "Novus Renewable Services Limited", "state": "wales", "country": "uk", "lat": "53.034175", "long": "-2.954379", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.034175+-2.954379", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Third Drove, Fengate - Battery Storage", "city": "", "id": "765", "external_id": "11558", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Flag Fen Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "765", "external_id": "11558", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Third Drove, Fengate - Battery Storage", "external_id": "11558", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Flag Fen Power Limited", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.5702", "long": "-0.205405", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11558", "Record Last Updated (dd/mm/yyyy)": "28/06/2022", "Operator (or Applicant)": "Flag Fen Power Limited", "Site Name": "Third Drove, Fengate - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Third Drove Fengate ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE1 5QR", "X-coordinate": "521724", "Y-coordinate": "298443", "Planning Authority": "Peterborough City Council", "Planning Application Reference": "22/00740/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.5702", "long": "-0.205405", "status": "planning", "mw": 50, "ext_id": "11558"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/06/2022", "to": "16/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "05/01/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11558", "Record Last Updated (dd/mm/yyyy)": "16/01/2024", "Operator (or Applicant)": "Flag Fen Power Limited", "Site Name": "Third Drove, Fengate - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Third Drove Fengate ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE1 5QR", "X-coordinate": "521724", "Y-coordinate": "298443", "Planning Authority": "Peterborough City Council", "Planning Application Reference": "22/00740/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.5702", "long": "-0.205405", "status": "planning", "mw": 50, "ext_id": "11558"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Third Drove, Fengate - Battery Storage", "name_short": "Third Drove, Fengate", "owner": "Flag Fen Power Limited", "state": "eastern", "country": "uk", "lat": "52.5702", "long": "-0.205405", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.5702+-0.205405", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sutton Manor - Battery Storage Facility", "city": "", "id": "766", "external_id": "11559", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Sizing John Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "766", "external_id": "11559", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sutton Manor - Battery Storage Facility", "external_id": "11559", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Sizing John Limited", "status": "planning", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419678", "long": "-2.738489", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11559", "Record Last Updated (dd/mm/yyyy)": "28/06/2022", "Operator (or Applicant)": "Sizing John Limited", "Site Name": "Sutton Manor - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens ", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "WA9 4QH", "X-coordinate": "351018", "Y-coordinate": "391685", "Planning Authority": "St Helens Council", "Planning Application Reference": "P/2022/0392/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419678", "long": "-2.738489", "status": "planning", "mw": 57, "ext_id": "11559"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/06/2022", "to": "21/10/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "8439", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "16/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "16/09/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "21/10/2022", "to": "28/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11559", "Record Last Updated (dd/mm/yyyy)": "28/06/2022", "Operator (or Applicant)": "Sizing John Limited", "Site Name": "Sutton Manor - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8439", "Address": "S/O National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens ", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "WA9 4QH", "X-coordinate": "351018", "Y-coordinate": "391685", "Planning Authority": "St Helens Council", "Planning Application Reference": "P/2022/0392/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419678", "long": "-2.738489", "status": "planning", "mw": 57, "ext_id": "11559"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sutton Manor - Battery Storage Facility", "name_short": "Sutton Manor", "owner": "Sizing John Limited", "state": "north west", "country": "uk", "lat": "53.419678", "long": "-2.738489", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419678+-2.738489", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Craig Watch - Wind Farm & Battery Storage", "city": "", "id": "768", "external_id": "11609", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "27", "power_mw": "27", "customer": "", "owner": "Craig Watch Wind Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "768", "external_id": "11609", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Craig Watch - Wind Farm & Battery Storage", "external_id": "11609", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 27, "power_mw": 27, "owner": "Craig Watch Wind Farm Limited", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.445774", "long": "-3.129628", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11609", "Record Last Updated (dd/mm/yyyy)": "07/07/2022", "Operator (or Applicant)": "Craig Watch Wind Farm Limited", "Site Name": "Craig Watch - Wind Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11608", "Installed Capacity (MWelec)": "27.4", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Craig Watch Wind Farm Moray", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 4AA", "X-coordinate": "332299", "Y-coordinate": "840059", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00002177", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.445774", "long": "-3.129628", "status": "planning", "mw": 27, "ext_id": "11609"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11609", "Record Last Updated (dd/mm/yyyy)": "07/07/2022", "Operator (or Applicant)": "Craig Watch Wind Farm Limited", "Site Name": "Craig Watch - Wind Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11608", "Installed Capacity (MWelec)": "27.4", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Craig Watch Wind Farm Moray", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 4AA", "X-coordinate": "332299", "Y-coordinate": "840059", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00002177", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.445774", "long": "-3.129628", "status": "planning", "mw": 27, "ext_id": "11609"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 27, "mwh_is_estimate": true, "mwh": 27, "mwh_estimate": 27, "status": "planning", "status_class": "", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Craig Watch - Wind Farm & Battery Storage", "name_short": "Craig Watch - Wind Farm &", "owner": "Craig Watch Wind Farm Limited", "state": "scotland", "country": "uk", "lat": "57.445774", "long": "-3.129628", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.445774+-3.129628", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grassing Rome Street - Battery Storage", "city": "", "id": "769", "external_id": "11611", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "STOR 141 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "769", "external_id": "11611", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grassing Rome Street - Battery Storage", "external_id": "11611", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "STOR 141 Limited", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.886256", "long": "-2.933199", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11611", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "STOR 141 Limited", "Site Name": "Grassing Rome Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Railway Line and Bousteads Grassing, Rome Street, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA2 5AD", "X-coordinate": "340233", "Y-coordinate": "555011", "Planning Authority": "Carlisle City council", "Planning Application Reference": "22/0513", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.886256", "long": "-2.933199", "status": "planning", "mw": 15, "ext_id": "11611"}, "first_month": "2022-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11611", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "STOR 141 Limited", "Site Name": "Grassing Rome Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Railway Line and Bousteads Grassing, Rome Street, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA2 5AD", "X-coordinate": "340233", "Y-coordinate": "555011", "Planning Authority": "Carlisle City council", "Planning Application Reference": "22/0513", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.886256", "long": "-2.933199", "status": "planning", "mw": 15, "ext_id": "11611"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grassing Rome Street - Battery Storage", "name_short": "Grassing Rome Street", "owner": "STOR 141 Limited", "state": "north west", "country": "uk", "lat": "54.886256", "long": "-2.933199", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.886256+-2.933199", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "city": "", "id": "770", "external_id": "11612", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "ADV 003 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "770", "external_id": "11612", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "external_id": "11612", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "ADV 003 Limited", "status": "planning", "date_first_heard": "2023-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.375577", "long": "-2.171149", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11612", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "ADV 003 Limited", "Site Name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN12 8LW", "X-coordinate": "388184", "Y-coordinate": "164072", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/03914", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.375577", "long": "-2.171149", "status": "planning", "mw": 150, "ext_id": "11612"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/07/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "23/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/01/2023", "to": "08/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11612", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "ADV 003 Limited", "Site Name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN12 8LW", "X-coordinate": "388184", "Y-coordinate": "164072", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/03914", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.375577", "long": "-2.171149", "status": "planning", "mw": 150, "ext_id": "11612"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "name_short": "Norrington Gate Farm, Broughton Gif...", "owner": "ADV 003 Limited", "state": "south west", "country": "uk", "lat": "51.375577", "long": "-2.171149", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.375577+-2.171149", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "city": "", "id": "771", "external_id": "11619", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Lightsource BP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "771", "external_id": "11619", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "external_id": "11619", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Lightsource BP", "status": "planning", "date_first_heard": "2023-07-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.835", "long": "-1.724221", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11619", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "Lightsource BP", "Site Name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11618", "Installed Capacity (MWelec)": "45", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of Edge Lane Maiden Law ", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH7 0RY", "X-coordinate": "417812", "Y-coordinate": "548943", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/01769/FPA ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.835", "long": "-1.724221", "status": "planning", "mw": 45, "ext_id": "11619"}, "first_month": "2022-07", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/07/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11619", "Record Last Updated (dd/mm/yyyy)": "08/07/2022", "Operator (or Applicant)": "Lightsource BP", "Site Name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11618", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of Edge Lane Maiden Law ", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH7 0RY", "X-coordinate": "417812", "Y-coordinate": "548943", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/01769/FPA ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/07/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.835", "long": "-1.724221", "status": "planning", "mw": 45, "ext_id": "11619"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-07-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "name_short": "Edge Lane, Maiden Law - Solar Farm ...", "owner": "Lightsource BP", "state": "north east", "country": "uk", "lat": "54.835", "long": "-1.724221", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.835+-1.724221", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newhouse Farm - Energy Storage Facility", "city": "", "id": "801", "external_id": "9047", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "801", "external_id": "9047", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newhouse Farm - Energy Storage Facility", "external_id": "9047", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2023-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.402533", "long": "-3.49146", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9047", "Record Last Updated (dd/mm/yyyy)": "29/07/2022", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Newhouse Farm - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "170 Metres S/O Newhouse Farm, Perth", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH1 1QF", "X-coordinate": "308050", "Y-coordinate": "724363", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/01071/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.402533", "long": "-3.49146", "status": "planning", "mw": 49, "ext_id": "9047"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/07/2022", "to": "08/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "27/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/02/2023", "to": "29/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9047", "Record Last Updated (dd/mm/yyyy)": "29/07/2022", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Newhouse Farm - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "170 Metres S/O Newhouse Farm, Perth", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH1 1QF", "X-coordinate": "308050", "Y-coordinate": "724363", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/01071/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.402533", "long": "-3.49146", "status": "planning", "mw": 49, "ext_id": "9047"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newhouse Farm - Energy Storage Facility", "name_short": "Newhouse Farm - Energy", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "56.402533", "long": "-3.49146", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.402533+-3.49146", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fiddlers Ferry Power Station - Battery storage", "city": "", "id": "802", "external_id": "9404", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "SSE Enterprise (SSE PLC)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "802", "external_id": "9404", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fiddlers Ferry Power Station - Battery storage", "external_id": "9404", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "SSE Enterprise (SSE PLC)", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.373023", "long": "-2.68793", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9404", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "SSE Enterprise (SSE PLC)", "Site Name": "Fiddlers Ferry Power Station - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fiddlers Ferry Power Station, Widnes Road, Warrington", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA5 2UT", "X-coordinate": "354328", "Y-coordinate": "386461", "Planning Authority": "Warrington Borough Council", "Planning Application Reference": "2022/41800", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.373023", "long": "-2.68793", "status": "planning", "mw": 150, "ext_id": "9404"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/08/2022", "to": "06/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/06/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/07/2023", "to": "08/08/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9404", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "SSE Enterprise (SSE PLC)", "Site Name": "Fiddlers Ferry Power Station - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fiddlers Ferry Power Station, Widnes Road, Warrington", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA5 2UT", "X-coordinate": "354328", "Y-coordinate": "386461", "Planning Authority": "Warrington Borough Council", "Planning Application Reference": "2022/41800", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.373023", "long": "-2.68793", "status": "planning", "mw": 150, "ext_id": "9404"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fiddlers Ferry Power Station - Battery storage", "name_short": "Fiddlers Ferry Power Station", "owner": "SSE Enterprise (SSE PLC)", "state": "north west", "country": "uk", "lat": "53.373023", "long": "-2.68793", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.373023+-2.68793", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kilmarnock South Substation - Battery storage", "city": "", "id": "803", "external_id": "9696", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "803", "external_id": "9696", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kilmarnock South Substation - Battery storage", "external_id": "9696", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 300, "power_mw": 300, "owner": "Zenobe Energy", "status": "planning", "date_first_heard": "2023-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.578171", "long": "-4.46746", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9696", "Record Last Updated (dd/mm/yyyy)": "14/02/2022", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Kilmarnock South Substation - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kilmarnock South Substation Treeswoodhead Road ", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JP", "X-coordinate": "244549", "Y-coordinate": "634377", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003435", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.578171", "long": "-4.46746", "status": "planning", "mw": 300, "ext_id": "9696"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/02/2022", "to": "27/09/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "01/04/2022", "to": "22/02/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "10/03/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9696", "Record Last Updated (dd/mm/yyyy)": "27/09/2021", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Kilmarnock South Substation - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kilmarnock South Substation Treeswoodhead Road ", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JP", "X-coordinate": "244549", "Y-coordinate": "634377", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003435", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/03/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.578171", "long": "-4.46746", "status": "planning", "mw": 300, "ext_id": "9696"}, "current_month": "2024-01", "dates": {"first_heard": "2022-02-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 300, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kilmarnock South Substation - Battery storage", "name_short": "Kilmarnock South Substation", "owner": "Zenobe Energy", "state": "scotland", "country": "uk", "lat": "55.578171", "long": "-4.46746", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.578171+-4.46746", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Walpole, St Peter - Battery Energy Storage", "city": "", "id": "804", "external_id": "9762", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Roc Noir Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "804", "external_id": "9762", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "North Walpole, St Peter - Battery Energy Storage", "external_id": "9762", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Roc Noir Limited", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.71969", "long": "0.220937", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9762", "Record Last Updated (dd/mm/yyyy)": "18/08/2022", "Operator (or Applicant)": "Roc Noir Limited", "Site Name": "North Walpole, St Peter - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SE Down Track From Westmoor West Drove North Walpole St Peter Wisbech Norfolk", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HU", "X-coordinate": "550103", "Y-coordinate": "315873", "Planning Authority": "King's Lynn and West Norfolk Borough Council", "Planning Application Reference": "21/01803/FM ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.71969", "long": "0.220937", "status": "planning", "mw": 100, "ext_id": "9762"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Planning Authority", "from": "King's Lynn and West Norfolk Borough Council", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/08/2022", "to": "07/10/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9762", "Record Last Updated (dd/mm/yyyy)": "07/10/2021", "Operator (or Applicant)": "Roc Noir Limited", "Site Name": "North Walpole, St Peter - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SE Down Track From Westmoor West Drove North Walpole St Peter Wisbech Norfolk", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HU", "X-coordinate": "550103", "Y-coordinate": "315873", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "21/01803/FM ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/09/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/06/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.71969", "long": "0.220937", "status": "planning", "mw": 100, "ext_id": "9762"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "North Walpole, St Peter - Battery Energy Storage", "name_short": "North Walpole, St Peter", "owner": "Roc Noir Limited", "state": "eastern", "country": "uk", "lat": "52.71969", "long": "0.220937", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.71969+0.220937", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ochiltree - Battery Sorage", "city": "", "id": "805", "external_id": "10162", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "805", "external_id": "10162", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ochiltree - Battery Sorage", "external_id": "10162", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Statkraft UK Limited", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.454634", "long": "-4.266842", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10162", "Record Last Updated (dd/mm/yyyy)": "06/10/2022", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Ochiltree - Battery Sorage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Substation A70 From B730 To U74 Bardarroch Ochiltree ", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256745", "Y-coordinate": "62020", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "21/0748/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/10/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.440496", "long": "-4.018763", "status": "planning", "mw": 19, "ext_id": "10162"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Y-coordinate", "from": "62020", "to": "620201", "extra": "", "change_type": "misc"}, {"name": "lat", "from": "50.440496", "to": "55.454634", "extra": "", "change_type": "misc"}, {"name": "long", "from": "-4.018763", "to": "-4.266842", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "05/10/2022", "to": "05/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "15312", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10162", "Record Last Updated (dd/mm/yyyy)": "06/10/2022", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Ochiltree - Battery Sorage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15312", "Are they re-applying (Old REPD Ref) ": "", "Address": "Electricity Substation A70 From B730 To U74 Bardarroch Ochiltree ", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256745", "Y-coordinate": "620201", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "21/0748/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/11/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454634", "long": "-4.266842", "status": "planning", "mw": 19, "ext_id": "10162"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ochiltree - Battery Sorage", "name_short": "Ochiltree - Battery Sorage", "owner": "Statkraft UK Limited", "state": "scotland", "country": "uk", "lat": "55.454634", "long": "-4.266842", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.454634+-4.266842", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bullen Lane - Battery Storage", "city": "", "id": "806", "external_id": "10311", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Cambridge Power Limited / Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "806", "external_id": "10311", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bullen Lane - Battery Storage", "external_id": "10311", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Cambridge Power Limited / Pivot Power", "status": "construction", "date_first_heard": "2022-07-07", "start_construction": "2023-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.077364", "long": "1.094549", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10311", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Cambridge Power Limited / Pivot Power", "Site Name": "Bullen Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Bullen Lane", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP8 4JD", "X-coordinate": "612154", "Y-coordinate": "246630", "Planning Authority": "Babergh and Mid Suffolk District Council", "Planning Application Reference": "DC/21/05468", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/07/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.077364", "long": "1.094549", "status": "planning", "mw": 100, "ext_id": "10311"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/07/2022", "to": "17/10/2022", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Babergh and Mid Suffolk District Council", "to": "Babergh & Mid Suffolk District Councils", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "05/12/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/07/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "10311", "Record Last Updated (dd/mm/yyyy)": "05/12/2023", "Operator (or Applicant)": "Cambridge Power Limited / Pivot Power", "Site Name": "Bullen Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Bullen Lane", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP8 4JD", "X-coordinate": "612154", "Y-coordinate": "246630", "Planning Authority": "Babergh & Mid Suffolk District Councils", "Planning Application Reference": "DC/21/05468", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/07/2025", "Under Construction": "01/07/2023", "Operational": "", "Heat Network Ref": "", "lat": "52.077364", "long": "1.094549", "status": "construction", "mw": 100, "ext_id": "10311"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-18", "start_construction": "2023-12-05", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07-07", "start_construction": "2023-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bullen Lane - Battery Storage", "name_short": "Bullen Lane", "owner": "Cambridge Power Limited / Pivot Power", "state": "eastern", "country": "uk", "lat": "52.077364", "long": "1.094549", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.077364+1.094549", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Uskmouth Power Station - Battery Storage", "city": "", "id": "807", "external_id": "10936", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "230", "power_mw": "230", "customer": "", "owner": "Simec Atlantic Energy Uskmouth Power Station", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "807", "external_id": "10936", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Uskmouth Power Station - Battery Storage", "external_id": "10936", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 230, "power_mw": 230, "owner": "Simec Atlantic Energy Uskmouth Power Station", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.548527", "long": "-2.949183", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10936", "Record Last Updated (dd/mm/yyyy)": "09/09/2022", "Operator (or Applicant)": "Simec Atlantic Energy Uskmouth Power Station", "Site Name": "Uskmouth Power Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "230", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Uskmouth Power Station West Nash Road Nash Newport ", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP18 2BZ", "X-coordinate": "334280", "Y-coordinate": "183720", "Planning Authority": "Newport City Council", "Planning Application Reference": "22/0823", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.548527", "long": "-2.949183", "status": "planning", "mw": 230, "ext_id": "10936"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/09/2022", "to": "20/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "07/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/12/2027", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/12/2022", "to": "06/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10936", "Record Last Updated (dd/mm/yyyy)": "06/04/2022", "Operator (or Applicant)": "Simec Atlantic Energy Uskmouth Power Station", "Site Name": "Uskmouth Power Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "230", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Uskmouth Power Station West Nash Road Nash Newport ", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP18 2BZ", "X-coordinate": "334280", "Y-coordinate": "183720", "Planning Authority": "Newport City Council", "Planning Application Reference": "22/0823", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/12/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.548527", "long": "-2.949183", "status": "planning", "mw": 230, "ext_id": "10936"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 230, "mwh_is_estimate": true, "mwh": 230, "mwh_estimate": 230, "status": "planning", "status_class": "", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Uskmouth Power Station - Battery Storage", "name_short": "Uskmouth Power Station", "owner": "Simec Atlantic Energy Uskmouth Power Station", "state": "wales", "country": "uk", "lat": "51.548527", "long": "-2.949183", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.548527+-2.949183", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Bendings - Battery Storage", "city": "", "id": "808", "external_id": "10985", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Fiddes Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "808", "external_id": "10985", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Bendings - Battery Storage", "external_id": "10985", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Fiddes Battery Limited", "status": "planning", "date_first_heard": "2023-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.924265", "long": "-2.30368", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10985", "Record Last Updated (dd/mm/yyyy)": "29/09/2022", "Operator (or Applicant)": "Fiddes Battery Limited", "Site Name": "West Bendings - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North West Of West Bendings", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB39 2XR", "X-coordinate": "381613", "Y-coordinate": "781481", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2007", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.924265", "long": "-2.30368", "status": "planning", "mw": 30, "ext_id": "10985"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/09/2022", "to": "04/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/07/2023", "to": "11/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10985", "Record Last Updated (dd/mm/yyyy)": "11/04/2022", "Operator (or Applicant)": "Fiddes Battery Limited", "Site Name": "West Bendings - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North West Of West Bendings", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB39 2XR", "X-coordinate": "381613", "Y-coordinate": "781481", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2007", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.924265", "long": "-2.30368", "status": "planning", "mw": 30, "ext_id": "10985"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Bendings - Battery Storage", "name_short": "West Bendings", "owner": "Fiddes Battery Limited", "state": "scotland", "country": "uk", "lat": "56.924265", "long": "-2.30368", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.924265+-2.30368", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ash Lane, Little London - Battery Storage", "city": "", "id": "810", "external_id": "11090", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Bramley BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "810", "external_id": "11090", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ash Lane, Little London - Battery Storage", "external_id": "11090", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Bramley BESS Limited", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.339184", "long": "-1.08705", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11090", "Record Last Updated (dd/mm/yyyy)": "15/07/2022", "Operator (or Applicant)": "Bramley BESS Limited", "Site Name": "Ash Lane, Little London - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of Ash Park Business Centre Ash Lane Little London, Tadley", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG26 5FL", "X-coordinate": "463691", "Y-coordinate": "160406", "Planning Authority": "Basingstoke and Deane Council", "Planning Application Reference": "22/01797/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.339184", "long": "-1.08705", "status": "planning", "mw": 57, "ext_id": "11090"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/07/2022", "to": "16/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Basingstoke and Deane Council", "to": "Basingstoke & Deane Borough Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/02/2023", "to": "27/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11090", "Record Last Updated (dd/mm/yyyy)": "27/04/2022", "Operator (or Applicant)": "Bramley BESS Limited", "Site Name": "Ash Lane, Little London - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of Ash Park Business Centre Ash Lane Little London, Tadley", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "RG26 5FL", "X-coordinate": "463691", "Y-coordinate": "160406", "Planning Authority": "Basingstoke & Deane Borough Council", "Planning Application Reference": "22/01797/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.339184", "long": "-1.08705", "status": "planning", "mw": 57, "ext_id": "11090"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ash Lane, Little London - Battery Storage", "name_short": "Ash Lane, Little London", "owner": "Bramley BESS Limited", "state": "south east", "country": "uk", "lat": "51.339184", "long": "-1.08705", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.339184+-1.08705", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Worset Lane - Battery Energy Storage System", "city": "", "id": "811", "external_id": "11406", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Clearstone Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "811", "external_id": "11406", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Worset Lane - Battery Energy Storage System", "external_id": "11406", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Clearstone Energy", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.685388", "long": "-1.212911", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11406", "Record Last Updated (dd/mm/yyyy)": "05/08/2022", "Operator (or Applicant)": "Clearstone Energy", "Site Name": "Worset Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Worset Lane, Hartlepool", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "TS26", "X-coordinate": "450841", "Y-coordinate": "532544", "Planning Authority": "Hartlepool Borough Council", "Planning Application Reference": "H/2022/0263", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.685388", "long": "-1.212911", "status": "planning", "mw": 200, "ext_id": "11406"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/08/2022", "to": "01/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/01/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2023", "to": "07/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11406", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "Clearstone Energy", "Site Name": "Worset Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Worset Lane, Hartlepool", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "TS26", "X-coordinate": "450841", "Y-coordinate": "532544", "Planning Authority": "Hartlepool Borough Council", "Planning Application Reference": "H/2022/0263", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.685388", "long": "-1.212911", "status": "planning", "mw": 200, "ext_id": "11406"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Worset Lane - Battery Energy Storage System", "name_short": "Worset Lane - Battery", "owner": "Clearstone Energy", "state": "north east", "country": "uk", "lat": "54.685388", "long": "-1.212911", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.685388+-1.212911", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "city": "", "id": "812", "external_id": "11414", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "812", "external_id": "11414", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "external_id": "11414", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Balance Power Projects Limited", "status": "planning", "date_first_heard": "2022-08-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.569579", "long": "-2.191966", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11414", "Record Last Updated (dd/mm/yyyy)": "25/08/2022", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Staffordshire Railway Walk, Castlecroft Road, Castlecroft, Wolverhampton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XX", "X-coordinate": "387086", "Y-coordinate": "296879", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "21/00440/FUL", "Appeal Reference": "APP/C3430/W/22/3292837", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "23/12/2021", "Appeal Lodged": "12/04/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "16/08/2022", "Planning Permission Granted": "16/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.569579", "long": "-2.191966", "status": "planning", "mw": 50, "ext_id": "11414"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11414", "Record Last Updated (dd/mm/yyyy)": "25/08/2022", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Staffordshire Railway Walk, Castlecroft Road, Castlecroft, Wolverhampton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV4 4XX", "X-coordinate": "387086", "Y-coordinate": "296879", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "21/00440/FUL", "Appeal Reference": "APP/C3430/W/22/3292837", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "23/12/2021", "Appeal Lodged": "12/04/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "16/08/2022", "Planning Permission Granted": "16/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.569579", "long": "-2.191966", "status": "planning", "mw": 50, "ext_id": "11414"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-08-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "name_short": "South Staffordshire Railway Walk, C...", "owner": "Balance Power Projects Limited", "state": "west midlands", "country": "uk", "lat": "52.569579", "long": "-2.191966", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.569579+-2.191966", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Neil Fox Way - Battery Storage", "city": "Wakefield", "id": "813", "external_id": "11519", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.67289", "long": "-1.46662", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://planning.wakefield.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=REJXN6QQFWN00", "link2": "", "link3": "", "link4": ""}, "internal_id": "813", "external_id": "11519", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Neil Fox Way - Battery Storage", "external_id": "11519", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.669961", "long": "-1.468833", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11519", "Record Last Updated (dd/mm/yyyy)": "26/09/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Neil Fox Way - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Wakefield B Substation And East Of Neil Fox Way ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": " WF1 5DB", "X-coordinate": "435191", "Y-coordinate": "419407", "Planning Authority": "Wakefield Council", "Planning Application Reference": "22/01460/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.669961", "long": "-1.468833", "status": "planning", "mw": 99, "ext_id": "11519"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "26/09/2022", "to": "22/09/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11519", "Record Last Updated (dd/mm/yyyy)": "22/09/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Neil Fox Way - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Wakefield B Substation And East Of Neil Fox Way ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": " WF1 5DB", "X-coordinate": "435191", "Y-coordinate": "419407", "Planning Authority": "Wakefield Council", "Planning Application Reference": "22/01460/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.669961", "long": "-1.468833", "status": "planning", "mw": 99, "ext_id": "11519"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Neil Fox Way - Battery Storage", "name_short": "Neil Fox Way", "owner": "Harmony Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.669961", "long": "-1.468833", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.669961+-1.468833", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://planning.wakefield.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=REJXN6QQFWN00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "city": "", "id": "814", "external_id": "11623", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "66", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "814", "external_id": "11623", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "external_id": "11623", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "EcoDev Group Limited", "status": "planning", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.532097", "long": "-3.297128", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11623", "Record Last Updated (dd/mm/yyyy)": "12/10/2022", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11622", "Installed Capacity (MWelec)": "66", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Mains Of Keithick Farm, Keithick, Blairgowrie", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9NF", "X-coordinate": "320315", "Y-coordinate": "738540", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004521", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.532097", "long": "-3.297128", "status": "planning", "mw": 66, "ext_id": "11623"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/10/2022", "to": "06/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "21/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/04/2023", "to": "13/07/2022", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "66", "to": "16", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 66, "to": 16, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11623", "Record Last Updated (dd/mm/yyyy)": "13/07/2022", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11622", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Mains Of Keithick Farm, Keithick, Blairgowrie", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH13 9NF", "X-coordinate": "320315", "Y-coordinate": "738540", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004521", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.532097", "long": "-3.297128", "status": "planning", "mw": 16, "ext_id": "11623"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "name_short": "Mains Of Keithick Farm, Keithick - ...", "owner": "EcoDev Group Limited", "state": "scotland", "country": "uk", "lat": "56.532097", "long": "-3.297128", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.532097+-3.297128", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Knockkippen Wind, Solar & Battery Farm", "city": "", "id": "817", "external_id": "11676", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Falck Renewables / REG Windpower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "817", "external_id": "11676", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Knockkippen Wind, Solar & Battery Farm", "external_id": "11676", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "Falck Renewables / REG Windpower", "status": "planning", "date_first_heard": "2022-07-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.348007", "long": "-4.467301", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11676", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Falck Renewables / REG Windpower", "Site Name": "Knockkippen Wind, Solar & Battery Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10468", "Installed Capacity (MWelec)": "16", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Knockkippen Moss", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7JH", "X-coordinate": "243650", "Y-coordinate": "608770", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004523", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.348007", "long": "-4.467301", "status": "planning", "mw": 16, "ext_id": "11676"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11676", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Falck Renewables / REG Windpower", "Site Name": "Knockkippen Wind, Solar & Battery Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10468", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Knockkippen Moss", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7JH", "X-coordinate": "243650", "Y-coordinate": "608770", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004523", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.348007", "long": "-4.467301", "status": "planning", "mw": 16, "ext_id": "11676"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2022-07-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Knockkippen Wind, Solar & Battery Farm", "name_short": "Knockkippen Wind, Solar & Battery F...", "owner": "Falck Renewables / REG Windpower", "state": "scotland", "country": "uk", "lat": "55.348007", "long": "-4.467301", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.348007+-4.467301", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dragons Lane - Battery Storage Facility", "city": "", "id": "818", "external_id": "11701", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Hydrock", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "818", "external_id": "11701", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dragons Lane - Battery Storage Facility", "external_id": "11701", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Hydrock", "status": "planning", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.16224", "long": "-2.411803", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11701", "Record Last Updated (dd/mm/yyyy)": "20/07/2022", "Operator (or Applicant)": "Hydrock", "Site Name": "Dragons Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Dragon's Lane, Sandbach, Moston", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW11 3QH", "X-coordinate": "372564", "Y-coordinate": "362870", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "22/2219C", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.16224", "long": "-2.411803", "status": "planning", "mw": 12, "ext_id": "11701"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/07/2022", "to": "12/12/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/12/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/12/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "20/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11701", "Record Last Updated (dd/mm/yyyy)": "20/07/2022", "Operator (or Applicant)": "Hydrock", "Site Name": "Dragons Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Dragon's Lane, Sandbach, Moston", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW11 3QH", "X-coordinate": "372564", "Y-coordinate": "362870", "Planning Authority": "Cheshire East Council", "Planning Application Reference": "22/2219C", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.16224", "long": "-2.411803", "status": "planning", "mw": 12, "ext_id": "11701"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dragons Lane - Battery Storage Facility", "name_short": "Dragons Lane", "owner": "Hydrock", "state": "north west", "country": "uk", "lat": "53.16224", "long": "-2.411803", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.16224+-2.411803", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clay Tye Farm Phase 1 - Storage Facility", "city": "Upminster", "id": "819", "external_id": "11720", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-07-18", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552891", "long": "0.293464", "coords_hint": "", "use_case": "", "notes": "Duplicate of 76", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "819", "external_id": "11720", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clay Tye Farm Phase 1 - Storage Facility", "external_id": "11720", "state": "london", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "construction", "date_first_heard": "2017-07-18", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.551771", "long": "0.294345", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11720", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Clay Tye Farm Phase 1 - Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Clay Tye Farm, Clay Tye Road, Upminster", "County": "London", "Region": "London", "Country": "England", "Post Code": "RM14 3PL", "X-coordinate": "559168", "Y-coordinate": "186148", "Planning Authority": "London Borough of Havering Council", "Planning Application Reference": "P0611.17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.551771", "long": "0.294345", "status": "construction", "mw": 49, "ext_id": "11720"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Planning Authority", "from": "London Borough of Havering Council", "to": "London Borough of Havering", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11720", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Clay Tye Farm Phase 1 - Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Clay Tye Farm, Clay Tye Road, Upminster", "County": "London", "Region": "London", "Country": "England", "Post Code": "RM14 3PL", "X-coordinate": "559168", "Y-coordinate": "186148", "Planning Authority": "London Borough of Havering", "Planning Application Reference": "P0611.17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/07/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.551771", "long": "0.294345", "status": "construction", "mw": 49, "ext_id": "11720"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2017-07-18", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clay Tye Farm Phase 1 - Storage Facility", "name_short": "Clay Tye Farm Phase 1", "owner": "Harmony Energy Storage", "state": "london", "country": "uk", "lat": "51.551771", "long": "0.294345", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.551771+0.294345", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 76"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clay Tye Farm Phase 2 - Storage Facility", "city": "Upminster", "id": "820", "external_id": "11721", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-09-10", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552891", "long": "0.293464", "coords_hint": "", "use_case": "", "notes": "Duplicate of 76", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "820", "external_id": "11721", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clay Tye Farm Phase 2 - Storage Facility", "external_id": "11721", "state": "london", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "construction", "date_first_heard": "2018-09-10", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.551771", "long": "0.294345", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11721", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Clay Tye Farm Phase 2 - Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Clay Tye Farm, Clay Tye Road, Upminster", "County": "London", "Region": "London", "Country": "England", "Post Code": "RM14 3PL", "X-coordinate": "559168", "Y-coordinate": "186148", "Planning Authority": "London Borough of Havering Council", "Planning Application Reference": "P0888.18", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/09/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.551771", "long": "0.294345", "status": "construction", "mw": 49, "ext_id": "11721"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Planning Authority", "from": "London Borough of Havering Council", "to": "London Borough of Havering", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11721", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Clay Tye Farm Phase 2 - Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Clay Tye Farm, Clay Tye Road, Upminster", "County": "London", "Region": "London", "Country": "England", "Post Code": "RM14 3PL", "X-coordinate": "559168", "Y-coordinate": "186148", "Planning Authority": "London Borough of Havering", "Planning Application Reference": "P0888.18", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/09/2018", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/07/2022", "Operational": "", "Heat Network Ref": "", "lat": "51.551771", "long": "0.294345", "status": "construction", "mw": 49, "ext_id": "11721"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2018-09-10", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clay Tye Farm Phase 2 - Storage Facility", "name_short": "Clay Tye Farm Phase 2", "owner": "Harmony Energy Storage", "state": "london", "country": "uk", "lat": "51.551771", "long": "0.294345", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.551771+0.294345", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 76"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Indian Queens Sub-Station - Battery Storage", "city": "", "id": "821", "external_id": "11725", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "Prime Energy Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "821", "external_id": "11725", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Indian Queens Sub-Station - Battery Storage", "external_id": "11725", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 47, "power_mw": 47, "owner": "Prime Energy Development Limited", "status": "planning", "date_first_heard": "2022-10-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.390894", "long": "-4.894992", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11725", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Prime Energy Development Limited", "Site Name": "Indian Queens Sub-Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South West Of Indian Queens Sub-station St Dennis ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194318", "Y-coordinate": "58564", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA22/05961", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.390894", "long": "-4.894992", "status": "planning", "mw": 47, "ext_id": "11725"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/07/2022", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/10/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/10/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "25/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11725", "Record Last Updated (dd/mm/yyyy)": "25/07/2022", "Operator (or Applicant)": "Prime Energy Development Limited", "Site Name": "Indian Queens Sub-Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South West Of Indian Queens Sub-station St Dennis ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194318", "Y-coordinate": "58564", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA22/05961", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/10/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.390894", "long": "-4.894992", "status": "planning", "mw": 47, "ext_id": "11725"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 47, "mwh_is_estimate": true, "mwh": 47, "mwh_estimate": 47, "status": "planning", "status_class": "", "date_first_heard": "2022-10-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Indian Queens Sub-Station - Battery Storage", "name_short": "Indian Queens Sub-Station", "owner": "Prime Energy Development Limited", "state": "south west", "country": "uk", "lat": "50.390894", "long": "-4.894992", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.390894+-4.894992", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Catsbrain Farm - Battery Storage ", "city": "", "id": "822", "external_id": "11787", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Conrad Energy (Developments) II Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "822", "external_id": "11787", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Catsbrain Farm - Battery Storage ", "external_id": "11787", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Conrad Energy (Developments) II Limited", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.600842", "long": "-1.748759", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11787", "Record Last Updated (dd/mm/yyyy)": "04/08/2022", "Operator (or Applicant)": "Conrad Energy (Developments) II Limited", "Site Name": "Catsbrain Farm - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7988", "Address": "N/O Kingsdown Road & West Of Catsbrain Farm Swindon", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN3 4TD", "X-coordinate": "417498", "Y-coordinate": "189141", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/22/1051", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.600842", "long": "-1.748759", "status": "planning", "mw": 30, "ext_id": "11787"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11787", "Record Last Updated (dd/mm/yyyy)": "04/08/2022", "Operator (or Applicant)": "Conrad Energy (Developments) II Limited", "Site Name": "Catsbrain Farm - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7988", "Address": "N/O Kingsdown Road & West Of Catsbrain Farm Swindon", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN3 4TD", "X-coordinate": "417498", "Y-coordinate": "189141", "Planning Authority": "Swindon Borough Council", "Planning Application Reference": "S/22/1051", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.600842", "long": "-1.748759", "status": "planning", "mw": 30, "ext_id": "11787"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Catsbrain Farm - Battery Storage ", "name_short": "Catsbrain Farm - Battery Storage ", "owner": "Conrad Energy (Developments) II Limited", "state": "south west", "country": "uk", "lat": "51.600842", "long": "-1.748759", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.600842+-1.748759", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "city": "", "id": "823", "external_id": "11793", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "823", "external_id": "11793", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "external_id": "11793", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Anglo Renewables Limited", "status": "planning", "date_first_heard": "2022-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.533595", "long": "-2.449525", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11793", "Record Last Updated (dd/mm/yyyy)": "04/08/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Says Court Farm Badminton Road Coalpit Heath", "County": "South Gloucestershire ", "Region": "South West", "Country": "England", "Post Code": "BS36 2NY", "X-coordinate": "368916", "Y-coordinate": "181728", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P22/03920/F ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.533595", "long": "-2.449525", "status": "planning", "mw": 50, "ext_id": "11793"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "04/08/2022", "to": "14/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "02/11/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "02/11/2025", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/11/2022", "to": "04/08/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11793", "Record Last Updated (dd/mm/yyyy)": "04/08/2022", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Says Court Farm Badminton Road Coalpit Heath", "County": "South Gloucestershire ", "Region": "South West", "Country": "England", "Post Code": "BS36 2NY", "X-coordinate": "368916", "Y-coordinate": "181728", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P22/03920/F ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.533595", "long": "-2.449525", "status": "planning", "mw": 50, "ext_id": "11793"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "name_short": "Says Court Farm, Coalpit Heath", "owner": "Anglo Renewables Limited", "state": "south west", "country": "uk", "lat": "51.533595", "long": "-2.449525", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.533595+-2.449525", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fairholme, Minety - Battery Storage", "city": "", "id": "825", "external_id": "11810", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "825", "external_id": "11810", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fairholme, Minety - Battery Storage", "external_id": "11810", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.610387", "long": "-1.97829", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11810", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Fairholme, Minety - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10488", "Address": "Dog Trap Lane , Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9PW", "X-coordinate": "401600", "Y-coordinate": "190173", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/05412", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.610387", "long": "-1.97829", "status": "planning", "mw": 50, "ext_id": "11810"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11810", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Fairholme, Minety - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10488", "Address": "Dog Trap Lane , Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9PW", "X-coordinate": "401600", "Y-coordinate": "190173", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/05412", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.610387", "long": "-1.97829", "status": "planning", "mw": 50, "ext_id": "11810"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fairholme, Minety - Battery Storage", "name_short": "Fairholme, Minety", "owner": "Pelagic Energy", "state": "south west", "country": "uk", "lat": "51.610387", "long": "-1.97829", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.610387+-1.97829", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stonehill, Minety", "city": "", "id": "826", "external_id": "11812", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Penso Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "826", "external_id": "11812", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stonehill, Minety", "external_id": "11812", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Penso Power Limited", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.606289", "long": "-2.006175", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11812", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Penso Power Limited", "Site Name": "Stonehill, Minety", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stonehill, Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "399669", "Y-coordinate": "189717", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/05504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.606289", "long": "-2.006175", "status": "planning", "mw": 50, "ext_id": "11812"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11812", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Penso Power Limited", "Site Name": "Stonehill, Minety", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stonehill, Minety", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN16 9DX", "X-coordinate": "399669", "Y-coordinate": "189717", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2022/05504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.606289", "long": "-2.006175", "status": "planning", "mw": 50, "ext_id": "11812"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stonehill, Minety", "name_short": "Stonehill, Minety", "owner": "Penso Power Limited", "state": "south west", "country": "uk", "lat": "51.606289", "long": "-2.006175", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.606289+-2.006175", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sclenteuch Wind Farm ", "city": "", "id": "828", "external_id": "11987", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "828", "external_id": "11987", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sclenteuch Wind Farm ", "external_id": "11987", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "RES Limited", "status": "planning", "date_first_heard": "2022-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.335658", "long": "-4.513053", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11987", "Record Last Updated (dd/mm/yyyy)": "05/09/2022", "Operator (or Applicant)": "RES Limited", "Site Name": "Sclenteuch Wind Farm ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9930", "Installed Capacity (MWelec)": "45", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "4612", "Address": "Sclenteuch Wind Farm, Cumnock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7LN", "X-coordinate": "240700", "Y-coordinate": "607500", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003318", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.335658", "long": "-4.513053", "status": "planning", "mw": 45, "ext_id": "11987"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11987", "Record Last Updated (dd/mm/yyyy)": "05/09/2022", "Operator (or Applicant)": "RES Limited", "Site Name": "Sclenteuch Wind Farm ", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9930", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "4612", "Address": "Sclenteuch Wind Farm, Cumnock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7LN", "X-coordinate": "240700", "Y-coordinate": "607500", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003318", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.335658", "long": "-4.513053", "status": "planning", "mw": 45, "ext_id": "11987"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2022-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sclenteuch Wind Farm ", "name_short": "Sclenteuch Wind Farm ", "owner": "RES Limited", "state": "scotland", "country": "uk", "lat": "55.335658", "long": "-4.513053", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.335658+-4.513053", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Braintree Road, Cressing - Battery Storage", "city": "", "id": "829", "external_id": "11995", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "829", "external_id": "11995", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Braintree Road, Cressing - Battery Storage", "external_id": "11995", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Pivot Power (EDF Renewables)", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.875638", "long": "0.573744", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11995", "Record Last Updated (dd/mm/yyyy)": "06/09/2022", "Operator (or Applicant)": "Pivot Power", "Site Name": "Braintree Road, Cressing - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7161", "Address": "Electricity Sub Station Site, Braintree Road, Cressing, Braintree", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM7 3NA", "X-coordinate": "577266", "Y-coordinate": "222805", "Planning Authority": "Braintree District Council", "Planning Application Reference": "22/02180/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.875638", "long": "0.573744", "status": "planning", "mw": 57, "ext_id": "11995"}, "first_month": "2022-10", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/09/2022", "to": "11/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Pivot Power", "to": "Pivot Power (EDF Renewables)", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11995", "Record Last Updated (dd/mm/yyyy)": "11/09/2023", "Operator (or Applicant)": "Pivot Power (EDF Renewables)", "Site Name": "Braintree Road, Cressing - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "Ground", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7161", "Address": "Electricity Sub Station Site, Braintree Road, Cressing, Braintree", "County": "Essex", "Region": "Eastern", "Country": "England", "Post Code": "CM7 3NA", "X-coordinate": "577266", "Y-coordinate": "222805", "Planning Authority": "Braintree District Council", "Planning Application Reference": "22/02180/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.875638", "long": "0.573744", "status": "planning", "mw": 57, "ext_id": "11995"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Braintree Road, Cressing - Battery Storage", "name_short": "Braintree Road, Cressing", "owner": "Pivot Power (EDF Renewables)", "state": "eastern", "country": "uk", "lat": "51.875638", "long": "0.573744", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.875638+0.573744", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Househill House, Househill - Battery Storage", "city": "", "id": "830", "external_id": "12056", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "830", "external_id": "12056", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Househill House, Househill - Battery Storage", "external_id": "12056", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Energy Storage Limited", "status": "planning", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.575557", "long": "-3.861558", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12056", "Record Last Updated (dd/mm/yyyy)": "09/09/2022", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Househill House, Househill - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "300M SE Of Househill House Househill Nairn", "County": "Highlands", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5RX", "X-coordinate": "288770", "Y-coordinate": "855471", "Planning Authority": "Highlands Council", "Planning Application Reference": "22/03638/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.575557", "long": "-3.861558", "status": "planning", "mw": 49, "ext_id": "12056"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "County", "from": "Highlands", "to": "Highland", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/09/2022", "to": "10/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/02/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12056", "Record Last Updated (dd/mm/yyyy)": "10/03/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Househill House, Househill - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "300M SE Of Househill House Househill Nairn", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV12 5RX", "X-coordinate": "288770", "Y-coordinate": "855471", "Planning Authority": "Highland Council", "Planning Application Reference": "22/03638/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.575557", "long": "-3.861558", "status": "planning", "mw": 49, "ext_id": "12056"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Househill House, Househill - Battery Storage", "name_short": "Househill House, Househill", "owner": "Whirlwind Energy Storage Limited", "state": "scotland", "country": "uk", "lat": "57.575557", "long": "-3.861558", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.575557+-3.861558", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sandy Knowe Wind Farm Extension", "city": "", "id": "831", "external_id": "12080", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Executive Resource Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "831", "external_id": "12080", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sandy Knowe Wind Farm Extension", "external_id": "12080", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 28, "power_mw": 28, "owner": "Executive Resource Group", "status": "planning", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.372765", "long": "-3.947719", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12080", "Record Last Updated (dd/mm/yyyy)": "16/09/2022", "Operator (or Applicant)": "Executive Resource Group", "Site Name": "Sandy Knowe Wind Farm Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12079", "Installed Capacity (MWelec)": "28.4", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sandy Knowe Wind Farm, Kirkconnell, Sanquhar", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG4 6JY", "X-coordinate": "276668", "Y-coordinate": "610480", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003274", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.372765", "long": "-3.947719", "status": "planning", "mw": 28, "ext_id": "12080"}, "first_month": "2022-10", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12080", "Record Last Updated (dd/mm/yyyy)": "16/09/2022", "Operator (or Applicant)": "Executive Resource Group", "Site Name": "Sandy Knowe Wind Farm Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12079", "Installed Capacity (MWelec)": "28.4", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sandy Knowe Wind Farm, Kirkconnell, Sanquhar", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG4 6JY", "X-coordinate": "276668", "Y-coordinate": "610480", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003274", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.372765", "long": "-3.947719", "status": "planning", "mw": 28, "ext_id": "12080"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 28, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "planning", "status_class": "", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sandy Knowe Wind Farm Extension", "name_short": "Sandy Knowe Wind Farm Extension", "owner": "Executive Resource Group", "state": "scotland", "country": "uk", "lat": "55.372765", "long": "-3.947719", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.372765+-3.947719", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "city": "", "id": "832", "external_id": "12125", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Infra Balance New Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "832", "external_id": "12125", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "external_id": "12125", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Infra Balance New Energy", "status": "planning", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.026063", "long": "-2.892336", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12125", "Record Last Updated (dd/mm/yyyy)": "20/09/2022", "Operator (or Applicant)": "Infra Balance New Energy", "Site Name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Middleton Clean Energy Plant, Middleton Road, Middleton, Morecambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3NT", "X-coordinate": "341641", "Y-coordinate": "459265", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "22/00839/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.026063", "long": "-2.892336", "status": "planning", "mw": 50, "ext_id": "12125"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/09/2022", "to": "23/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/05/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12125", "Record Last Updated (dd/mm/yyyy)": "23/06/2023", "Operator (or Applicant)": "Infra Balance New Energy", "Site Name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Middleton Clean Energy Plant, Middleton Road, Middleton, Morecambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3NT", "X-coordinate": "341641", "Y-coordinate": "459265", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "22/00839/FUL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.026063", "long": "-2.892336", "status": "planning", "mw": 50, "ext_id": "12125"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "name_short": "Lancaster Power Extension, Middleto...", "owner": "Infra Balance New Energy", "state": "north west", "country": "uk", "lat": "54.026063", "long": "-2.892336", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.026063+-2.892336", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "city": "", "id": "833", "external_id": "12174", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "STOR 107 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "833", "external_id": "12174", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "external_id": "12174", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "STOR 107 Limited", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.014013", "long": "-3.161939", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12174", "Record Last Updated (dd/mm/yyyy)": "27/09/2022", "Operator (or Applicant)": "STOR 107 Limited", "Site Name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hele Manor Farm, Hele Road, Bradford on Tone", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA4 1AH", "X-coordinate": "318587", "Y-coordinate": "124491", "Planning Authority": "Somerset West & Taunton", "Planning Application Reference": "07/22/0013", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.014013", "long": "-3.161939", "status": "planning", "mw": 20, "ext_id": "12174"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2022", "to": "19/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "13/04/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/04/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12174", "Record Last Updated (dd/mm/yyyy)": "19/06/2023", "Operator (or Applicant)": "STOR 107 Limited", "Site Name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hele Manor Farm, Hele Road, Bradford on Tone", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA4 1AH", "X-coordinate": "318587", "Y-coordinate": "124491", "Planning Authority": "Somerset West & Taunton", "Planning Application Reference": "07/22/0013", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/04/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.014013", "long": "-3.161939", "status": "planning", "mw": 20, "ext_id": "12174"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "name_short": "Hele Manor Farm, Bradford On Tone -...", "owner": "STOR 107 Limited", "state": "south west", "country": "uk", "lat": "51.014013", "long": "-3.161939", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.014013+-3.161939", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Waterloo Farm, Furbarn Road - Battery Storage", "city": "", "id": "834", "external_id": "12187", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "834", "external_id": "12187", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Waterloo Farm, Furbarn Road - Battery Storage", "external_id": "12187", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Shaw-Energi Limited", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.617082", "long": "-2.222376", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12187", "Record Last Updated (dd/mm/yyyy)": "18/08/2023", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "Waterloo Farm, Furbarn Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14597", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Waterloo Farm, Carr Wood And Clay Lane Power Station Furbarn Road", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 5UT", "X-coordinate": "385387", "Y-coordinate": "413416", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "22/00946/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2022", "Planning Application Withdrawn": "03/12/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.617082", "long": "-2.222376", "status": "planning", "mw": 57, "ext_id": "12187"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12187", "Record Last Updated (dd/mm/yyyy)": "18/08/2023", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "Waterloo Farm, Furbarn Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14597", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Waterloo Farm, Carr Wood And Clay Lane Power Station Furbarn Road", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 5UT", "X-coordinate": "385387", "Y-coordinate": "413416", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "22/00946/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2022", "Planning Application Withdrawn": "03/12/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.617082", "long": "-2.222376", "status": "planning", "mw": 57, "ext_id": "12187"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Waterloo Farm, Furbarn Road - Battery Storage", "name_short": "Waterloo Farm, Furbarn Road", "owner": "Shaw-Energi Limited", "state": "north west", "country": "uk", "lat": "53.617082", "long": "-2.222376", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.617082+-2.222376", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Redcote Lane, Armley - Battery Storage Facility", "city": "", "id": "835", "external_id": "12224", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Leeds Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "835", "external_id": "12224", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Redcote Lane, Armley - Battery Storage Facility", "external_id": "12224", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Cambridge Power Limited", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.805956", "long": "-1.588989", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12224", "Record Last Updated (dd/mm/yyyy)": "05/10/2022", "Operator (or Applicant)": "Leeds Power Limited", "Site Name": "Redcote Lane, Armley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7111", "Address": "Storage Land Adjacent 4 Redcote Lane Burley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS4 2AL", "X-coordinate": "427165", "Y-coordinate": "434485", "Planning Authority": "Leeds City Council", "Planning Application Reference": "22/05849/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.805956", "long": "-1.588989", "status": "planning", "mw": 60, "ext_id": "12224"}, "first_month": "2022-10", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/10/2022", "to": "26/05/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "18/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/05/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Operator (or Applicant)", "from": "Leeds Power Limited", "to": "Cambridge Power Limited", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12224", "Record Last Updated (dd/mm/yyyy)": "26/05/2023", "Operator (or Applicant)": "Cambridge Power Limited", "Site Name": "Redcote Lane, Armley - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7111", "Address": "Storage Land Adjacent 4 Redcote Lane Burley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS4 2AL", "X-coordinate": "427165", "Y-coordinate": "434485", "Planning Authority": "Leeds City Council", "Planning Application Reference": "22/05849/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.805956", "long": "-1.588989", "status": "planning", "mw": 60, "ext_id": "12224"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Redcote Lane, Armley - Battery Storage Facility", "name_short": "Redcote Lane, Armley", "owner": "Cambridge Power Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.805956", "long": "-1.588989", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.805956+-1.588989", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Back Lane, Skerne - Solar Farm & Battery Storage", "city": "", "id": "837", "external_id": "12297", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "BayWa r.e. UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "837", "external_id": "12297", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Back Lane, Skerne - Solar Farm & Battery Storage", "external_id": "12297", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "BayWa r.e. UK Limited", "status": "planning", "date_first_heard": "2020-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.983342", "long": "-0.407987", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12297", "Record Last Updated (dd/mm/yyyy)": "13/10/2022", "Operator (or Applicant)": "BayWa r.e. UK Limited", "Site Name": "Back Lane, Skerne - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12296", "Installed Capacity (MWelec)": "30", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Back Lane, Skerne, Driffield", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO25 9HP", "X-coordinate": "504494", "Y-coordinate": "455316", "Planning Authority": "East Riding Of Yorkshire Council", "Planning Application Reference": "20/01962/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.983342", "long": "-0.407987", "status": "planning", "mw": 30, "ext_id": "12297"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/10/2022", "to": "18/11/2022", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12297", "Record Last Updated (dd/mm/yyyy)": "18/11/2022", "Operator (or Applicant)": "BayWa r.e. UK Limited", "Site Name": "Back Lane, Skerne - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12296", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Back Lane, Skerne, Driffield", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO25 9HP", "X-coordinate": "504494", "Y-coordinate": "455316", "Planning Authority": "East Riding Of Yorkshire Council", "Planning Application Reference": "20/01962/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/07/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/10/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/10/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.983342", "long": "-0.407987", "status": "planning", "mw": 30, "ext_id": "12297"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2020-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Back Lane, Skerne - Solar Farm & Battery Storage", "name_short": "Back Lane, Skerne - Solar Farm &", "owner": "BayWa r.e. UK Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.983342", "long": "-0.407987", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.983342+-0.407987", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Manor Farm Energy Storage", "city": "", "id": "868", "external_id": "6948", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Innova Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "868", "external_id": "6948", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Manor Farm Energy Storage", "external_id": "6948", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Innova Renewables Limited", "status": "planning", "date_first_heard": "2017-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.147505", "long": "0.19181", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "6948", "Record Last Updated (dd/mm/yyyy)": "15/12/2022", "Operator (or Applicant)": "Innova Renewables Limited", "Site Name": "Manor Farm Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "1694", "Installed Capacity (MWelec)": "10", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Manor Farm, Wainfleet Road, Irby-in-the-Marsh, Skegness", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE24 5AY", "X-coordinate": "546683", "Y-coordinate": "363395", "Planning Authority": "East Lindsey District Council", "Planning Application Reference": "S/051/00772/17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.147505", "long": "0.19181", "status": "planning", "mw": 10, "ext_id": "6948"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/12/2022", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/11/2020", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "15/12/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "6948", "Record Last Updated (dd/mm/yyyy)": "15/12/2022", "Operator (or Applicant)": "Innova Renewables Limited", "Site Name": "Manor Farm Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "1694", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Manor Farm, Wainfleet Road, Irby-in-the-Marsh, Skegness", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "PE24 5AY", "X-coordinate": "546683", "Y-coordinate": "363395", "Planning Authority": "East Lindsey District Council", "Planning Application Reference": "S/051/00772/17", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/11/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.147505", "long": "0.19181", "status": "planning", "mw": 10, "ext_id": "6948"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2017-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Manor Farm Energy Storage", "name_short": "Manor Farm", "owner": "Innova Renewables Limited", "state": "east midlands", "country": "uk", "lat": "53.147505", "long": "0.19181", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.147505+0.19181", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clash Gour", "city": "", "id": "869", "external_id": "7178", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Renewables/ Force 9 ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "869", "external_id": "7178", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clash Gour", "external_id": "7178", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "EDF Energy Renewables/ Force 9 ", "status": "planning", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.484976", "long": "-3.535323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7178", "Record Last Updated (dd/mm/yyyy)": "27/10/2022", "Operator (or Applicant)": "EDF Energy Renewables/ Force 9 ", "Site Name": "Clash Gour", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6372", "Installed Capacity (MWelec)": "50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " located to the southwest, north and east of Berry Burn ", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "308050", "Y-coordinate": "844900", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000738", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/10/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.484976", "long": "-3.535323", "status": "planning", "mw": 50, "ext_id": "7178"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/10/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "27/10/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7178", "Record Last Updated (dd/mm/yyyy)": "27/10/2022", "Operator (or Applicant)": "EDF Energy Renewables/ Force 9 ", "Site Name": "Clash Gour", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "6372", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " located to the southwest, north and east of Berry Burn ", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "308050", "Y-coordinate": "844900", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00000738", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/12/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/10/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/10/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.484976", "long": "-3.535323", "status": "planning", "mw": 50, "ext_id": "7178"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clash Gour", "name_short": "Clash Gour", "owner": "EDF Energy Renewables/ Force 9 ", "state": "scotland", "country": "uk", "lat": "57.484976", "long": "-3.535323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.484976+-3.535323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Welkin Mill", "city": "", "id": "871", "external_id": "7832", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "871", "external_id": "7832", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Welkin Mill", "external_id": "7832", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Noriker Power", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419099", "long": "-2.135741", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7832", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Noriker Power", "Site Name": "Welkin Mill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8055", "Are they re-applying (Old REPD Ref) ": "", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391076", "Y-coordinate": "391375", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/075050", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2019", "Planning Application Withdrawn": "28/05/2020", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419099", "long": "-2.135741", "status": "planning", "mw": 49, "ext_id": "7832"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/01/2023", "to": "12/08/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7832", "Record Last Updated (dd/mm/yyyy)": "12/08/2020", "Operator (or Applicant)": "Noriker Power", "Site Name": "Welkin Mill", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "8055", "Are they re-applying (Old REPD Ref) ": "", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport, Greater Manchester", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391076", "Y-coordinate": "391375", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/075050", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/12/2019", "Planning Application Withdrawn": "28/05/2020", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419099", "long": "-2.135741", "status": "planning", "mw": 49, "ext_id": "7832"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Welkin Mill", "name_short": "Welkin Mill", "owner": "Noriker Power", "state": "north west", "country": "uk", "lat": "53.419099", "long": "-2.135741", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419099+-2.135741", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wissett Solar Farm, Wissett - Battery Storage", "city": "", "id": "872", "external_id": "9913", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "872", "external_id": "9913", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wissett Solar Farm, Wissett - Battery Storage", "external_id": "9913", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Pathfinder Clean Energy UK Dev Limited", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.353137", "long": "1.485016", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9913", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Wissett Solar Farm, Wissett - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9912", "Installed Capacity (MWelec)": "10", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "UKZ139 BC Wissett Solar Farm, Grays Lane, Wissett ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 0RA", "X-coordinate": "637428", "Y-coordinate": "278503", "Planning Authority": "Waveney District Council", "Planning Application Reference": "DC/22/3313/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.353137", "long": "1.485016", "status": "planning", "mw": 10, "ext_id": "9913"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "11/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9913", "Record Last Updated (dd/mm/yyyy)": "11/11/2021", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Wissett Solar Farm, Wissett - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9912", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "UKZ139 BC Wissett Solar Farm, Grays Lane, Wissett ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 0RA", "X-coordinate": "637428", "Y-coordinate": "278503", "Planning Authority": "Waveney District Council", "Planning Application Reference": "DC/22/3313/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.353137", "long": "1.485016", "status": "planning", "mw": 10, "ext_id": "9913"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wissett Solar Farm, Wissett - Battery Storage", "name_short": "Wissett Solar Farm, Wissett", "owner": "Pathfinder Clean Energy UK Dev Limited", "state": "eastern", "country": "uk", "lat": "52.353137", "long": "1.485016", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.353137+1.485016", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whitehill Energy Storage", "city": "", "id": "873", "external_id": "10466", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "873", "external_id": "10466", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whitehill Energy Storage", "external_id": "10466", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2022-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.86363", "long": "-4.236884", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10466", "Record Last Updated (dd/mm/yyyy)": "11/11/2022", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Whitehill Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Whitehill Farm, Coatbridge Road", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G69 8DT", "X-coordinate": "260107", "Y-coordinate": "665646", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004632", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.86363", "long": "-4.236884", "status": "planning", "mw": 200, "ext_id": "10466"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/11/2022", "to": "27/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10466", "Record Last Updated (dd/mm/yyyy)": "27/01/2022", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Whitehill Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Whitehill Farm, Coatbridge Road", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G69 8DT", "X-coordinate": "260107", "Y-coordinate": "665646", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004632", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.86363", "long": "-4.236884", "status": "planning", "mw": 200, "ext_id": "10466"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whitehill Energy Storage", "name_short": "Whitehill", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "55.86363", "long": "-4.236884", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.86363+-4.236884", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newmarket Road, Bottisham - Battery Energy Storage", "city": "", "id": "874", "external_id": "10486", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "874", "external_id": "10486", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newmarket Road, Bottisham - Battery Energy Storage", "external_id": "10486", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Ridge Clean Energy Limited", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.21614", "long": "0.282934", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10486", "Record Last Updated (dd/mm/yyyy)": "01/12/2022", "Operator (or Applicant)": "Ridge Clean Energy Limited", "Site Name": "Newmarket Road, Bottisham - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10485", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Six Oaks Renewable Energy Park Newmarket Road Bottisham ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 9BD", "X-coordinate": "556060", "Y-coordinate": "260003", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "22/01291/ESF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.21614", "long": "0.282934", "status": "planning", "mw": 50, "ext_id": "10486"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/12/2022", "to": "03/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10486", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Ridge Clean Energy Limited", "Site Name": "Newmarket Road, Bottisham - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10485", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Six Oaks Renewable Energy Park Newmarket Road Bottisham ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "CB25 9BD", "X-coordinate": "556060", "Y-coordinate": "260003", "Planning Authority": "East Cambridgeshire District Council", "Planning Application Reference": "22/01291/ESF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.21614", "long": "0.282934", "status": "planning", "mw": 50, "ext_id": "10486"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newmarket Road, Bottisham - Battery Energy Storage", "name_short": "Newmarket Road, Bottisham", "owner": "Ridge Clean Energy Limited", "state": "eastern", "country": "uk", "lat": "52.21614", "long": "0.282934", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.21614+0.282934", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Shaftesbury Energy Park - Battery Storage System", "city": "", "id": "875", "external_id": "10626", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": " TagEnergy ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "875", "external_id": "10626", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Shaftesbury Energy Park - Battery Storage System", "external_id": "10626", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": " TagEnergy ", "status": "planning", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.013484", "long": "-2.212803", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10626", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": " TagEnergy ", "Site Name": "Shaftesbury Energy Park - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawkers Hill Farm Shaftesbury Road Motcombe", "County": "Dorset ", "Region": "South West", "Country": "England", "Post Code": "SP7 9NP", "X-coordinate": "385168", "Y-coordinate": "123811", "Planning Authority": "North Dorset District Council", "Planning Application Reference": "P/FUL/2022/06179", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.013484", "long": "-2.212803", "status": "planning", "mw": 100, "ext_id": "10626"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/11/2022", "to": "31/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "29/03/2035", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/03/2023", "to": "16/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10626", "Record Last Updated (dd/mm/yyyy)": "16/02/2022", "Operator (or Applicant)": " TagEnergy ", "Site Name": "Shaftesbury Energy Park - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawkers Hill Farm Shaftesbury Road Motcombe", "County": "Dorset ", "Region": "South West", "Country": "England", "Post Code": "SP7 9NP", "X-coordinate": "385168", "Y-coordinate": "123811", "Planning Authority": "North Dorset District Council", "Planning Application Reference": "P/FUL/2022/06179", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/03/2035", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.013484", "long": "-2.212803", "status": "planning", "mw": 100, "ext_id": "10626"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Shaftesbury Energy Park - Battery Storage System", "name_short": "Shaftesbury Energy Park - Battery S...", "owner": " TagEnergy ", "state": "south west", "country": "uk", "lat": "51.013484", "long": "-2.212803", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.013484+-2.212803", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rothienorman - Battery Storage", "city": "", "id": "876", "external_id": "10638", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "876", "external_id": "10638", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rothienorman - Battery Storage", "external_id": "10638", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco Limited", "status": "planning", "date_first_heard": "2022-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.4146", "long": "-2.466323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10638", "Record Last Updated (dd/mm/yyyy)": "22/11/2022", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Rothienorman - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "1.5km To The North West Of Rothienorman ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8GL", "X-coordinate": "372086", "Y-coordinate": "836121", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/1218", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.4146", "long": "-2.466323", "status": "planning", "mw": 49, "ext_id": "10638"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/11/2022", "to": "16/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10638", "Record Last Updated (dd/mm/yyyy)": "16/02/2022", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Rothienorman - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "1.5km To The North West Of Rothienorman ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8GL", "X-coordinate": "372086", "Y-coordinate": "836121", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/1218", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.4146", "long": "-2.466323", "status": "planning", "mw": 49, "ext_id": "10638"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rothienorman - Battery Storage", "name_short": "Rothienorman", "owner": "Anesco Limited", "state": "scotland", "country": "uk", "lat": "57.4146", "long": "-2.466323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.4146+-2.466323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hopsrig Wind Farm", "city": "", "id": "877", "external_id": "11066", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Muirhall Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "877", "external_id": "11066", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hopsrig Wind Farm", "external_id": "11066", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 14, "power_mw": 14, "owner": "Muirhall Energy Limited", "status": "planning", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.185847", "long": "-3.126869", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11066", "Record Last Updated (dd/mm/yyyy)": "27/10/2022", "Operator (or Applicant)": "Muirhall Energy Limited", "Site Name": "Hopsrig Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11065", "Installed Capacity (MWelec)": "14.1", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6099", "Address": " west of the B709, approximately 7.5 km north-west of Langholm and 15 km north-east of Lockerbie", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG13", "X-coordinate": "328347", "Y-coordinate": "588531", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002160", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.185847", "long": "-3.126869", "status": "planning", "mw": 14, "ext_id": "11066"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/10/2022", "to": "26/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11066", "Record Last Updated (dd/mm/yyyy)": "26/04/2022", "Operator (or Applicant)": "Muirhall Energy Limited", "Site Name": "Hopsrig Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11065", "Installed Capacity (MWelec)": "14.1", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6099", "Address": " west of the B709, approximately 7.5 km north-west of Langholm and 15 km north-east of Lockerbie", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG13", "X-coordinate": "328347", "Y-coordinate": "588531", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002160", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/10/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.185847", "long": "-3.126869", "status": "planning", "mw": 14, "ext_id": "11066"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 14, "mwh_is_estimate": true, "mwh": 14, "mwh_estimate": 14, "status": "planning", "status_class": "", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hopsrig Wind Farm", "name_short": "Hopsrig Wind Farm", "owner": "Muirhall Energy Limited", "state": "scotland", "country": "uk", "lat": "55.185847", "long": "-3.126869", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.185847+-3.126869", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Swangate Project - Energy Storage System", "city": "", "id": "879", "external_id": "11437", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Econergy International Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "879", "external_id": "11437", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Swangate Project - Energy Storage System", "external_id": "11437", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Econergy International Limited", "status": "planning", "date_first_heard": "2017-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.501776", "long": "-1.38039", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11437", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Econergy International Limited", "Site Name": "Swangate Project - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj West Melton Electricity Substation, Elsecar Road, Brampton Bierlow", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S63 6AG", "X-coordinate": "441197", "Y-coordinate": "400743", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2017/1132", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2020", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.501776", "long": "-1.38039", "status": "planning", "mw": 50, "ext_id": "11437"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "22/09/2020", "to": "NA", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "Implemented", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2022", "to": "09/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11437", "Record Last Updated (dd/mm/yyyy)": "09/06/2022", "Operator (or Applicant)": "Econergy International Limited", "Site Name": "Swangate Project - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj West Melton Electricity Substation, Elsecar Road, Brampton Bierlow", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S63 6AG", "X-coordinate": "441197", "Y-coordinate": "400743", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2017/1132", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/07/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.501776", "long": "-1.38039", "status": "planning", "mw": 50, "ext_id": "11437"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2017-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Swangate Project - Energy Storage System", "name_short": "Swangate Project", "owner": "Econergy International Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.501776", "long": "-1.38039", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.501776+-1.38039", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Overhill Farm, Rothienorman - Battery Energy Storage", "city": "", "id": "880", "external_id": "11590", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "880", "external_id": "11590", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Overhill Farm, Rothienorman - Battery Energy Storage", "external_id": "11590", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "One Planet Developments Limited", "status": "planning", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.403505", "long": "-2.521716", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11590", "Record Last Updated (dd/mm/yyyy)": "10/11/2022", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Overhill Farm, Rothienorman - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Overhill Farm Rothienorman Inverurie ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8YN", "X-coordinate": "368749", "Y-coordinate": "834910", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2252", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.403505", "long": "-2.521716", "status": "planning", "mw": 49, "ext_id": "11590"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/11/2022", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "01/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/03/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/03/2023", "to": "05/07/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11590", "Record Last Updated (dd/mm/yyyy)": "05/07/2022", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Overhill Farm, Rothienorman - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Overhill Farm Rothienorman Inverurie ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8YN", "X-coordinate": "368749", "Y-coordinate": "834910", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2252", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.403505", "long": "-2.521716", "status": "planning", "mw": 49, "ext_id": "11590"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Overhill Farm, Rothienorman - Battery Energy Storage", "name_short": "Overhill Farm, Rothienorman", "owner": "One Planet Developments Limited", "state": "scotland", "country": "uk", "lat": "57.403505", "long": "-2.521716", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.403505+-2.521716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Beanit Farm, Balsall Common - Battery Storage", "city": "", "id": "881", "external_id": "11656", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "881", "external_id": "11656", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Little Beanit Farm, Balsall Common - Battery Storage", "external_id": "11656", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Penso Power", "status": "planning", "date_first_heard": "2023-08-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.386124", "long": "-1.625067", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11656", "Record Last Updated (dd/mm/yyyy)": "10/11/2022", "Operator (or Applicant)": "Penso Power", "Site Name": "Little Beanit Farm, Balsall Common - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Beanit Farm Waste Lane Balsall Common Solihull ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7GH", "X-coordinate": "425615", "Y-coordinate": "276521", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2022/02308/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386124", "long": "-1.625067", "status": "planning", "mw": 200, "ext_id": "11656"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/11/2022", "to": "15/07/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "31/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11656", "Record Last Updated (dd/mm/yyyy)": "15/07/2022", "Operator (or Applicant)": "Penso Power", "Site Name": "Little Beanit Farm, Balsall Common - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Beanit Farm Waste Lane Balsall Common Solihull ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7GH", "X-coordinate": "425615", "Y-coordinate": "276521", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2022/02308/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "31/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "31/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386124", "long": "-1.625067", "status": "planning", "mw": 200, "ext_id": "11656"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-08-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Little Beanit Farm, Balsall Common - Battery Storage", "name_short": "Little Beanit Farm, Balsall Common", "owner": "Penso Power", "state": "west midlands", "country": "uk", "lat": "52.386124", "long": "-1.625067", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.386124+-1.625067", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rectory Farm, Rectory Lane - Battery Storage", "city": "", "id": "882", "external_id": "11905", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "882", "external_id": "11905", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rectory Farm, Rectory Lane - Battery Storage", "external_id": "11905", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Balance Power Projects Limited", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.308764", "long": "-2.102391", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11905", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Private Developer", "Site Name": "Rectory Farm, Rectory Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rectory Farm Rectory Lane Upton Warren", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "B61 7EL", "X-coordinate": "393116", "Y-coordinate": "267855", "Planning Authority": "Wychavon Council", "Planning Application Reference": "W/22/02326/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.308764", "long": "-2.102391", "status": "planning", "mw": 50, "ext_id": "11905"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/11/2022", "to": "02/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/02/2026", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Operator (or Applicant)", "from": "Private Developer", "to": "Balance Power Projects Limited", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "50", "to": "30", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 50, "to": 30, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11905", "Record Last Updated (dd/mm/yyyy)": "02/03/2023", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "Rectory Farm, Rectory Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rectory Farm Rectory Lane Upton Warren", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "B61 7EL", "X-coordinate": "393116", "Y-coordinate": "267855", "Planning Authority": "Wychavon Council", "Planning Application Reference": "W/22/02326/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.308764", "long": "-2.102391", "status": "planning", "mw": 30, "ext_id": "11905"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rectory Farm, Rectory Lane - Battery Storage", "name_short": "Rectory Farm, Rectory Lane", "owner": "Balance Power Projects Limited", "state": "west midlands", "country": "uk", "lat": "52.308764", "long": "-2.102391", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.308764+-2.102391", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hillside Farm, Lancaster Road - Battery Storage", "city": "", "id": "883", "external_id": "11948", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Hamilton March", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "883", "external_id": "11948", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hillside Farm, Lancaster Road - Battery Storage", "external_id": "11948", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Hamilton March\n", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.03864", "long": "-2.852232", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11948", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Hamilton March\n", "Site Name": "Hillside Farm, Lancaster Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12964", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hillside Farm Lancaster Road Heaton With Oxcliffe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3ET", "X-coordinate": "344285", "Y-coordinate": "460632", "Planning Authority": "Lancaster Council", "Planning Application Reference": "22/01035/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/08/2022", "Planning Application Withdrawn": "24/10/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.03864", "long": "-2.852232", "status": "planning", "mw": 100, "ext_id": "11948"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11948", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Hamilton March\n", "Site Name": "Hillside Farm, Lancaster Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "12964", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hillside Farm Lancaster Road Heaton With Oxcliffe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3ET", "X-coordinate": "344285", "Y-coordinate": "460632", "Planning Authority": "Lancaster Council", "Planning Application Reference": "22/01035/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/08/2022", "Planning Application Withdrawn": "24/10/2022", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.03864", "long": "-2.852232", "status": "planning", "mw": 100, "ext_id": "11948"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hillside Farm, Lancaster Road - Battery Storage", "name_short": "Hillside Farm, Lancaster Road", "owner": "Hamilton March\n", "state": "north west", "country": "uk", "lat": "54.03864", "long": "-2.852232", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.03864+-2.852232", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "city": "", "id": "884", "external_id": "12206", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "1000", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "884", "external_id": "12206", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "external_id": "12206", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 1000, "power_mw": 1000, "owner": "Alcemi Storage Development Limited", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.608914", "long": "-3.82084", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12206", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1000", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Broken Cross Open Cast Mine Tower Road Douglas Lanark ", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 9PB", "X-coordinate": "285396", "Y-coordinate": "636539", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004698", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.608914", "long": "-3.82084", "status": "planning", "mw": 1000, "ext_id": "12206"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12206", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1000", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Broken Cross Open Cast Mine Tower Road Douglas Lanark ", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 9PB", "X-coordinate": "285396", "Y-coordinate": "636539", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004698", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.608914", "long": "-3.82084", "status": "planning", "mw": 1000, "ext_id": "12206"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1000, "mwh_is_estimate": true, "mwh": 1000, "mwh_estimate": 1000, "status": "planning", "status_class": "", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "name_short": "Coalburn II Energy Storage Facility", "owner": "Alcemi Storage Development Limited", "state": "scotland", "country": "uk", "lat": "55.608914", "long": "-3.82084", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.608914+-3.82084", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "city": "", "id": "885", "external_id": "12303", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Flexion Energy UK Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "885", "external_id": "12303", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "external_id": "12303", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Flexion Energy UK Storage", "status": "planning", "date_first_heard": "2023-01-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.600393", "long": "-1.913937", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12303", "Record Last Updated (dd/mm/yyyy)": "17/10/2022", "Operator (or Applicant)": "Flexion Energy UK Storage", "Site Name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Greenbank Caravan And Trailers Hillhead Of Phingask", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QL", "X-coordinate": "405243", "Y-coordinate": "856712", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/1988", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.600393", "long": "-1.913937", "status": "planning", "mw": 50, "ext_id": "12303"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/10/2022", "to": "09/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/01/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12303", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "Flexion Energy UK Storage", "Site Name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Greenbank Caravan And Trailers Hillhead Of Phingask", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 8QL", "X-coordinate": "405243", "Y-coordinate": "856712", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/1988", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.600393", "long": "-1.913937", "status": "planning", "mw": 50, "ext_id": "12303"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "name_short": "Greenbank Caravan & Trailers, Hillh...", "owner": "Flexion Energy UK Storage", "state": "scotland", "country": "uk", "lat": "57.600393", "long": "-1.913937", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.600393+-1.913937", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ryton End, Barston - Battery Storage", "city": "", "id": "886", "external_id": "12348", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Greenfield Energy Consultancy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "886", "external_id": "12348", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ryton End, Barston - Battery Storage", "external_id": "12348", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Greenfield Energy Consultancy Limited", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.404549", "long": "-1.685104", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12348", "Record Last Updated (dd/mm/yyyy)": "19/10/2022", "Operator (or Applicant)": "Greenfield Energy Consultancy Limited", "Site Name": "Ryton End, Barston - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ryton End Barston ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B92 0LA", "X-coordinate": "421520", "Y-coordinate": "278551", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2022/02068/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.404549", "long": "-1.685104", "status": "planning", "mw": 50, "ext_id": "12348"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12348", "Record Last Updated (dd/mm/yyyy)": "19/10/2022", "Operator (or Applicant)": "Greenfield Energy Consultancy Limited", "Site Name": "Ryton End, Barston - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ryton End Barston ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B92 0LA", "X-coordinate": "421520", "Y-coordinate": "278551", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2022/02068/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.404549", "long": "-1.685104", "status": "planning", "mw": 50, "ext_id": "12348"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ryton End, Barston - Battery Storage", "name_short": "Ryton End, Barston", "owner": "Greenfield Energy Consultancy Limited", "state": "west midlands", "country": "uk", "lat": "52.404549", "long": "-1.685104", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.404549+-1.685104", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Killoch Depot, Killoch Colliery - Battery Storage", "city": "", "id": "887", "external_id": "12349", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Brockwell Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "887", "external_id": "12349", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Killoch Depot, Killoch Colliery - Battery Storage", "external_id": "12349", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Brockwell Energy Limited", "status": "planning", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.454673", "long": "-4.393136", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12349", "Record Last Updated (dd/mm/yyyy)": "19/10/2022", "Operator (or Applicant)": "Brockwell Energy Limited", "Site Name": "Killoch Depot, Killoch Colliery - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Killoch Depot Killoch Colliery Off A70 West Of Ochiltree Ochiltree", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18 2RL", "X-coordinate": "248760", "Y-coordinate": "620473", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "22/0405/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454673", "long": "-4.393136", "status": "planning", "mw": 49, "ext_id": "12349"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/10/2022", "to": "17/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "30/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "30/03/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12349", "Record Last Updated (dd/mm/yyyy)": "17/04/2023", "Operator (or Applicant)": "Brockwell Energy Limited", "Site Name": "Killoch Depot, Killoch Colliery - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Killoch Depot Killoch Colliery Off A70 West Of Ochiltree Ochiltree", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18 2RL", "X-coordinate": "248760", "Y-coordinate": "620473", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "22/0405/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454673", "long": "-4.393136", "status": "planning", "mw": 49, "ext_id": "12349"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Killoch Depot, Killoch Colliery - Battery Storage", "name_short": "Killoch Depot, Killoch Colliery", "owner": "Brockwell Energy Limited", "state": "scotland", "country": "uk", "lat": "55.454673", "long": "-4.393136", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.454673+-4.393136", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sellindge Substation, Church Lane - Battery Storage", "city": "", "id": "888", "external_id": "12351", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivoted Power Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "888", "external_id": "12351", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sellindge Substation, Church Lane - Battery Storage", "external_id": "12351", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Pivoted Power Llp", "status": "planning", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.10563", "long": "0.974985", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12351", "Record Last Updated (dd/mm/yyyy)": "19/10/2022", "Operator (or Applicant)": "Pivoted Power Llp", "Site Name": "Sellindge Substation, Church Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of National Grid Converter Station, Church Lane, Aldington,", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "TN25 6AF", "X-coordinate": "608362", "Y-coordinate": "138246", "Planning Authority": "Ashford Council", "Planning Application Reference": "PA/2022/2544", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.10563", "long": "0.974985", "status": "planning", "mw": 57, "ext_id": "12351"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Planning Authority", "from": "Ashford Council", "to": "Ashford Borough Council", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/10/2022", "to": "11/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "04/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12351", "Record Last Updated (dd/mm/yyyy)": "11/09/2023", "Operator (or Applicant)": "Pivoted Power Llp", "Site Name": "Sellindge Substation, Church Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of National Grid Converter Station, Church Lane, Aldington,", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "TN25 6AF", "X-coordinate": "608362", "Y-coordinate": "138246", "Planning Authority": "Ashford Borough Council", "Planning Application Reference": "PA/2022/2544", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.10563", "long": "0.974985", "status": "planning", "mw": 57, "ext_id": "12351"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sellindge Substation, Church Lane - Battery Storage", "name_short": "Sellindge Substation, Church Lane", "owner": "Pivoted Power Llp", "state": "south east", "country": "uk", "lat": "51.10563", "long": "0.974985", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.10563+0.974985", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sunny Oaks Renewable Energy Park", "city": "", "id": "890", "external_id": "12415", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Sunny Oaks Renewable Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "890", "external_id": "12415", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sunny Oaks Renewable Energy Park", "external_id": "12415", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 28, "power_mw": 28, "owner": "Sunny Oaks Renewable Energy Park Limited", "status": "planning", "date_first_heard": "2022-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.717104", "long": "-1.248203", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12415", "Record Last Updated (dd/mm/yyyy)": "24/10/2022", "Operator (or Applicant)": "Sunny Oaks Renewable Energy Park Limited", "Site Name": "Sunny Oaks Renewable Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12054", "Installed Capacity (MWelec)": "28.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Se/O Whiterails Road, W/O Briddlesford Road, Wootton, Ryde", "County": "Isle of Wight", "Region": "South East", "Country": "England", "Post Code": "PO33 4RL", "X-coordinate": "453171", "Y-coordinate": "91100", "Planning Authority": "Isle of Wight Council", "Planning Application Reference": "22/01585/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.717104", "long": "-1.248203", "status": "planning", "mw": 28, "ext_id": "12415"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12415", "Record Last Updated (dd/mm/yyyy)": "24/10/2022", "Operator (or Applicant)": "Sunny Oaks Renewable Energy Park Limited", "Site Name": "Sunny Oaks Renewable Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12054", "Installed Capacity (MWelec)": "28.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Se/O Whiterails Road, W/O Briddlesford Road, Wootton, Ryde", "County": "Isle of Wight", "Region": "South East", "Country": "England", "Post Code": "PO33 4RL", "X-coordinate": "453171", "Y-coordinate": "91100", "Planning Authority": "Isle of Wight Council", "Planning Application Reference": "22/01585/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.717104", "long": "-1.248203", "status": "planning", "mw": 28, "ext_id": "12415"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 28, "mwh_is_estimate": true, "mwh": 28, "mwh_estimate": 28, "status": "planning", "status_class": "", "date_first_heard": "2022-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sunny Oaks Renewable Energy Park", "name_short": "Sunny Oaks Renewable Energy Park", "owner": "Sunny Oaks Renewable Energy Park Limited", "state": "south east", "country": "uk", "lat": "50.717104", "long": "-1.248203", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.717104+-1.248203", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "John Green Frog Power Compound, John North Road - Battery System", "city": "", "id": "891", "external_id": "12455", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "891", "external_id": "12455", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "John Green Frog Power Compound, John North Road - Battery System", "external_id": "12455", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Green Frog Power Limited", "status": "planning", "date_first_heard": "2023-01-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.625182", "long": "-3.898523", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12455", "Record Last Updated (dd/mm/yyyy)": "28/10/2022", "Operator (or Applicant)": "Green Frog Power Limited", "Site Name": "John Green Frog Power Compound, John North Road - Battery System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Tir John Green Frog Power Compound Tir, John North Road, Port Tennant ", "County": "West Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "SA1 8NS ", "X-coordinate": "268678", "Y-coordinate": "193526", "Planning Authority": "Swansea Council", "Planning Application Reference": "2022/2356/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.625182", "long": "-3.898523", "status": "planning", "mw": 20, "ext_id": "12455"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/10/2022", "to": "24/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/01/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12455", "Record Last Updated (dd/mm/yyyy)": "24/01/2023", "Operator (or Applicant)": "Green Frog Power Limited", "Site Name": "John Green Frog Power Compound, John North Road - Battery System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Tir John Green Frog Power Compound Tir, John North Road, Port Tennant ", "County": "West Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "SA1 8NS ", "X-coordinate": "268678", "Y-coordinate": "193526", "Planning Authority": "Swansea Council", "Planning Application Reference": "2022/2356/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/01/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.625182", "long": "-3.898523", "status": "planning", "mw": 20, "ext_id": "12455"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-01-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "John Green Frog Power Compound, John North Road - Battery System", "name_short": "John Green Frog Power Compound, Joh...", "owner": "Green Frog Power Limited", "state": "wales", "country": "uk", "lat": "51.625182", "long": "-3.898523", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.625182+-3.898523", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Electricity Substation, Westerton Road - Battery Storage", "city": "", "id": "892", "external_id": "12467", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Keith Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "892", "external_id": "12467", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Electricity Substation, Westerton Road - Battery Storage", "external_id": "12467", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Keith Renewables Limited", "status": "planning", "date_first_heard": "2023-03-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.540623", "long": "-2.939551", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12467", "Record Last Updated (dd/mm/yyyy)": "28/10/2022", "Operator (or Applicant)": "Keith Renewables Limited", "Site Name": "Electricity Substation, Westerton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Electricity Substation Westerton Road ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NR", "X-coordinate": "343853", "Y-coordinate": "850444", "Planning Authority": "Moray Council", "Planning Application Reference": "22/01488/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.540623", "long": "-2.939551", "status": "planning", "mw": 49, "ext_id": "12467"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/10/2022", "to": "20/03/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/03/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12467", "Record Last Updated (dd/mm/yyyy)": "20/03/2023", "Operator (or Applicant)": "Keith Renewables Limited", "Site Name": "Electricity Substation, Westerton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent To Electricity Substation Westerton Road ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB55 5NR", "X-coordinate": "343853", "Y-coordinate": "850444", "Planning Authority": "Moray Council", "Planning Application Reference": "22/01488/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/03/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.540623", "long": "-2.939551", "status": "planning", "mw": 49, "ext_id": "12467"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Electricity Substation, Westerton Road - Battery Storage", "name_short": "Electricity Substation, Westerton R...", "owner": "Keith Renewables Limited", "state": "scotland", "country": "uk", "lat": "57.540623", "long": "-2.939551", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.540623+-2.939551", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eggborough Power Station, Selby Road - Battery Storage", "city": "", "id": "893", "external_id": "12483", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Eggborough Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "893", "external_id": "12483", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Eggborough Power Station, Selby Road - Battery Storage", "external_id": "12483", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Eggborough Power Limited", "status": "planning", "date_first_heard": "2023-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.713432", "long": "-1.129813", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12483", "Record Last Updated (dd/mm/yyyy)": "31/10/2022", "Operator (or Applicant)": "Eggborough Power Limited", "Site Name": "Eggborough Power Station, Selby Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Eggborough Power Station Selby Road Eggborough", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0BS", "X-coordinate": "457530", "Y-coordinate": "424464", "Planning Authority": "Selby Council", "Planning Application Reference": "2022/1105/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.713432", "long": "-1.129813", "status": "planning", "mw": 500, "ext_id": "12483"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/10/2022", "to": "24/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "17/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/01/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12483", "Record Last Updated (dd/mm/yyyy)": "24/01/2023", "Operator (or Applicant)": "Eggborough Power Limited", "Site Name": "Eggborough Power Station, Selby Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Eggborough Power Station Selby Road Eggborough", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0BS", "X-coordinate": "457530", "Y-coordinate": "424464", "Planning Authority": "Selby Council", "Planning Application Reference": "2022/1105/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.713432", "long": "-1.129813", "status": "planning", "mw": 500, "ext_id": "12483"}, "current_month": "2024-01", "dates": {"first_heard": "2022-10-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Eggborough Power Station, Selby Road - Battery Storage", "name_short": "Eggborough Power Station, Selby Roa...", "owner": "Eggborough Power Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.713432", "long": "-1.129813", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.713432+-1.129813", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Capenhurst Lane, Capenhurst - Battery Storage", "city": "", "id": "894", "external_id": "12503", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "894", "external_id": "12503", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Capenhurst Lane, Capenhurst - Battery Storage", "external_id": "12503", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Aura Power BESS Limited", "status": "planning", "date_first_heard": "2023-12-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.257431", "long": "-2.937607", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12503", "Record Last Updated (dd/mm/yyyy)": "03/11/2022", "Operator (or Applicant)": "Aura Power BESS Limited", "Site Name": "Capenhurst Lane, Capenhurst - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South of Capenhurst Lane Capenhurst ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH66 2NT", "X-coordinate": "337548", "Y-coordinate": "373791", "Planning Authority": "Cheshire West & Chester Council", "Planning Application Reference": "22/03585/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.257431", "long": "-2.937607", "status": "planning", "mw": 100, "ext_id": "12503"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/11/2022", "to": "13/12/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "08/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12503", "Record Last Updated (dd/mm/yyyy)": "13/12/2023", "Operator (or Applicant)": "Aura Power BESS Limited", "Site Name": "Capenhurst Lane, Capenhurst - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South of Capenhurst Lane Capenhurst ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CH66 2NT", "X-coordinate": "337548", "Y-coordinate": "373791", "Planning Authority": "Cheshire West & Chester Council", "Planning Application Reference": "22/03585/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "08/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "08/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.257431", "long": "-2.937607", "status": "planning", "mw": 100, "ext_id": "12503"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-12-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Capenhurst Lane, Capenhurst - Battery Storage", "name_short": "Capenhurst Lane, Capenhurst", "owner": "Aura Power BESS Limited", "state": "north west", "country": "uk", "lat": "53.257431", "long": "-2.937607", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.257431+-2.937607", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "city": "", "id": "895", "external_id": "12524", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Ecclesfield Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "895", "external_id": "12524", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "external_id": "12524", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Ecclesfield Power Limited", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.445358", "long": "-1.45098", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12524", "Record Last Updated (dd/mm/yyyy)": "03/11/2022", "Operator (or Applicant)": "Ecclesfield Power Limited", "Site Name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Yarra Industrial Estate North Side Of Loicher Lane Ecclesfield", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S35 9XN", "X-coordinate": "436563", "Y-coordinate": "394428", "Planning Authority": "Sheffield Council", "Planning Application Reference": "22/03914/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.445358", "long": "-1.45098", "status": "planning", "mw": 20, "ext_id": "12524"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12524", "Record Last Updated (dd/mm/yyyy)": "03/11/2022", "Operator (or Applicant)": "Ecclesfield Power Limited", "Site Name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Yarra Industrial Estate North Side Of Loicher Lane Ecclesfield", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S35 9XN", "X-coordinate": "436563", "Y-coordinate": "394428", "Planning Authority": "Sheffield Council", "Planning Application Reference": "22/03914/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.445358", "long": "-1.45098", "status": "planning", "mw": 20, "ext_id": "12524"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "name_short": "Yarra Industrial Estate, Loicher La...", "owner": "Ecclesfield Power Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.445358", "long": "-1.45098", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.445358+-1.45098", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Norwich Road Industrial Estate", "city": "", "id": "896", "external_id": "12529", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Eelpower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-26", "start_construction": "2022-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "896", "external_id": "12529", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Norwich Road Industrial Estate", "external_id": "12529", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Eelpower Limited", "status": "construction", "date_first_heard": "2021-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.356262", "long": "1.508561", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12529", "Record Last Updated (dd/mm/yyyy)": "04/11/2022", "Operator (or Applicant)": "Eelpower Limited", "Site Name": "Norwich Road Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6958", "Address": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 8QJ", "X-coordinate": "639014", "Y-coordinate": "278928", "Planning Authority": "Suffolk Coastal District Council", "Planning Application Reference": "DC/21/0521/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/03/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "26/03/2024", "Under Construction": "01/04/2022", "Operational": "", "Heat Network Ref": "", "lat": "52.356262", "long": "1.508561", "status": "construction", "mw": 50, "ext_id": "12529"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "26/03/2024", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "01/04/2022", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12529", "Record Last Updated (dd/mm/yyyy)": "04/11/2022", "Operator (or Applicant)": "Eelpower Limited", "Site Name": "Norwich Road Industrial Estate", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6958", "Address": "Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "IP19 8QJ", "X-coordinate": "639014", "Y-coordinate": "278928", "Planning Authority": "Suffolk Coastal District Council", "Planning Application Reference": "DC/21/0521/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/03/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/04/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.356262", "long": "1.508561", "status": "construction", "mw": 50, "ext_id": "12529"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2021-03-26", "start_construction": "2022-04-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Norwich Road Industrial Estate", "name_short": "Norwich Road Industrial Estate", "owner": "Eelpower Limited", "state": "eastern", "country": "uk", "lat": "52.356262", "long": "1.508561", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.356262+1.508561", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "city": "", "id": "897", "external_id": "12571", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "897", "external_id": "12571", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "external_id": "12571", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Hydrock", "status": "planning", "date_first_heard": "2023-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.895059", "long": "-2.272987", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12571", "Record Last Updated (dd/mm/yyyy)": "07/11/2022", "Operator (or Applicant)": "Hydrock", "Site Name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Aspley House Farm Aspley Lane Slindon Stafford ", "County": "Staffordshire ", "Region": "West Midlands", "Country": "England", "Post Code": "ST21 6FB ", "X-coordinate": "381732", "Y-coordinate": "333103", "Planning Authority": "Stafford Borough Council", "Planning Application Reference": "22/36378/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.895059", "long": "-2.272987", "status": "planning", "mw": 10, "ext_id": "12571"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/11/2022", "to": "08/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "27/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/01/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12571", "Record Last Updated (dd/mm/yyyy)": "08/02/2023", "Operator (or Applicant)": "Hydrock", "Site Name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Aspley House Farm Aspley Lane Slindon Stafford ", "County": "Staffordshire ", "Region": "West Midlands", "Country": "England", "Post Code": "ST21 6FB ", "X-coordinate": "381732", "Y-coordinate": "333103", "Planning Authority": "Stafford Borough Council", "Planning Application Reference": "22/36378/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.895059", "long": "-2.272987", "status": "planning", "mw": 10, "ext_id": "12571"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "name_short": "Aspley House Farm, Aspley Lane", "owner": "Hydrock", "state": "west midlands", "country": "uk", "lat": "52.895059", "long": "-2.272987", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.895059+-2.272987", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "898", "external_id": "12649", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "898", "external_id": "12649", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Derehams Farm, Derehams Lane - Battery Storage", "external_id": "12649", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12649", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15544", "Are they re-applying (Old REPD Ref) ": "", "Address": "Derehams Farm Derehams Lane Loudwater ", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Wycombe Council", "Planning Application Reference": "22/07255/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "05/05/2023", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 50, "ext_id": "12649"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12649", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15544", "Are they re-applying (Old REPD Ref) ": "", "Address": "Derehams Farm Derehams Lane Loudwater ", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Wycombe Council", "Planning Application Reference": "22/07255/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "05/05/2023", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 50, "ext_id": "12649"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Derehams Farm, Derehams Lane - Battery Storage", "name_short": "Derehams Farm, Derehams Lane", "owner": "Newton Energi Limited", "state": "south east", "country": "uk", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.611399+-0.693977", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walpole Sub Station, Walpole Bank - Battery Storage", "city": "", "id": "899", "external_id": "12683", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Field Devco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "899", "external_id": "12683", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walpole Sub Station, Walpole Bank - Battery Storage", "external_id": "12683", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Field Devco Limited", "status": "planning", "date_first_heard": "2023-07-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.725225", "long": "0.209119", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12683", "Record Last Updated (dd/mm/yyyy)": "23/11/2022", "Operator (or Applicant)": "Field Devco Limited", "Site Name": "Walpole Sub Station, Walpole Bank - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opposite Walpole Sub Station Walpole Bank Walpole St Andrew ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549286", "Y-coordinate": "316464", "Planning Authority": "Kings Lynn and West Norfolk Council", "Planning Application Reference": "22/02021/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.725225", "long": "0.209119", "status": "planning", "mw": 100, "ext_id": "12683"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2022", "to": "12/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Kings Lynn and West Norfolk Council", "to": "Borough Council of King's Lynn & West Norfolk", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "04/07/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "04/07/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12683", "Record Last Updated (dd/mm/yyyy)": "12/07/2023", "Operator (or Applicant)": "Field Devco Limited", "Site Name": "Walpole Sub Station, Walpole Bank - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opposite Walpole Sub Station Walpole Bank Walpole St Andrew ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549286", "Y-coordinate": "316464", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02021/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "04/07/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.725225", "long": "0.209119", "status": "planning", "mw": 100, "ext_id": "12683"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-07-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walpole Sub Station, Walpole Bank - Battery Storage", "name_short": "Walpole Sub Station, Walpole Bank", "owner": "Field Devco Limited", "state": "eastern", "country": "uk", "lat": "52.725225", "long": "0.209119", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.725225+0.209119", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Misslebrook Farm, Botley Road - Battery Storage", "city": "", "id": "900", "external_id": "12691", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Boom Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "900", "external_id": "12691", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Misslebrook Farm, Botley Road - Battery Storage", "external_id": "12691", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Boom Developments Limited", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.976271", "long": "-1.434694", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12691", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Boom Developments Limited", "Site Name": "Misslebrook Farm, Botley Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Misslebrook Farm Botley Road North Baddesley", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO52 9EE", "X-coordinate": "439785", "Y-coordinate": "119803", "Planning Authority": "Test Valley Council", "Planning Application Reference": "22/03346/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.976271", "long": "-1.434694", "status": "planning", "mw": 60, "ext_id": "12691"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12691", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Boom Developments Limited", "Site Name": "Misslebrook Farm, Botley Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Misslebrook Farm Botley Road North Baddesley", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO52 9EE", "X-coordinate": "439785", "Y-coordinate": "119803", "Planning Authority": "Test Valley Council", "Planning Application Reference": "22/03346/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.976271", "long": "-1.434694", "status": "planning", "mw": 60, "ext_id": "12691"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Misslebrook Farm, Botley Road - Battery Storage", "name_short": "Misslebrook Farm, Botley Road", "owner": "Boom Developments Limited", "state": "south east", "country": "uk", "lat": "50.976271", "long": "-1.434694", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.976271+-1.434694", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Freshfields, Fairy Lane - Battery Storage", "city": "", "id": "901", "external_id": "12694", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "STOR Power Utilities Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "901", "external_id": "12694", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Freshfields, Fairy Lane - Battery Storage", "external_id": "12694", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "STOR Power Utilities Limited", "status": "planning", "date_first_heard": "2023-03-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.419642", "long": "-2.282192", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12694", "Record Last Updated (dd/mm/yyyy)": "23/11/2022", "Operator (or Applicant)": "STOR Power Utilities Limited", "Site Name": "Freshfields, Fairy Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Freshfields Fairy Lane", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "M33 2JU", "X-coordinate": "381343", "Y-coordinate": "391464", "Planning Authority": "Trafford Council", "Planning Application Reference": "109463/FUL/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419642", "long": "-2.282192", "status": "planning", "mw": 99, "ext_id": "12694"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2022", "to": "12/04/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "20/03/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "20/03/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12694", "Record Last Updated (dd/mm/yyyy)": "12/04/2023", "Operator (or Applicant)": "STOR Power Utilities Limited", "Site Name": "Freshfields, Fairy Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Freshfields Fairy Lane", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "M33 2JU", "X-coordinate": "381343", "Y-coordinate": "391464", "Planning Authority": "Trafford Council", "Planning Application Reference": "109463/FUL/22", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.419642", "long": "-2.282192", "status": "planning", "mw": 99, "ext_id": "12694"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-03-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Freshfields, Fairy Lane - Battery Storage", "name_short": "Freshfields, Fairy Lane", "owner": "STOR Power Utilities Limited", "state": "north west", "country": "uk", "lat": "53.419642", "long": "-2.282192", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.419642+-2.282192", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Landulph, Ellbridge Lane - Battery Storage Facility", "city": "", "id": "902", "external_id": "12697", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivoted Power Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "902", "external_id": "12697", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Landulph, Ellbridge Lane - Battery Storage Facility", "external_id": "12697", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pivoted Power Llp", "status": "planning", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.447258", "long": "-4.249736", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12697", "Record Last Updated (dd/mm/yyyy)": "23/11/2022", "Operator (or Applicant)": "Pivoted Power Llp", "Site Name": "Landulph, Ellbridge Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7051", "Address": "Adjacent To Landulph National Grid 400kV Substation Ellbridge Lane Ellbridge ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6PU", "X-coordinate": "240368", "Y-coordinate": "63243", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA22/10000", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447258", "long": "-4.249736", "status": "planning", "mw": 49, "ext_id": "12697"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/11/2022", "to": "22/02/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "06/02/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "06/02/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12697", "Record Last Updated (dd/mm/yyyy)": "22/02/2023", "Operator (or Applicant)": "Pivoted Power Llp", "Site Name": "Landulph, Ellbridge Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7051", "Address": "Adjacent To Landulph National Grid 400kV Substation Ellbridge Lane Ellbridge ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6PU", "X-coordinate": "240368", "Y-coordinate": "63243", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA22/10000", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "06/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "06/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447258", "long": "-4.249736", "status": "planning", "mw": 49, "ext_id": "12697"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Landulph, Ellbridge Lane - Battery Storage Facility", "name_short": "Landulph, Ellbridge Lane", "owner": "Pivoted Power Llp", "state": "south west", "country": "uk", "lat": "50.447258", "long": "-4.249736", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.447258+-4.249736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "North Lincolnshire Green Energy Park", "city": "", "id": "904", "external_id": "12706", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Solar 21 Renewable Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "904", "external_id": "12706", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "North Lincolnshire Green Energy Park", "external_id": "12706", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Solar 21 Renewable Energy Limited", "status": "planning", "date_first_heard": "2022-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.619827", "long": "-0.701206", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12706", "Record Last Updated (dd/mm/yyyy)": "24/11/2022", "Operator (or Applicant)": "Solar 21 Renewable Energy Limited", "Site Name": "North Lincolnshire Green Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11621 & 12707", "Installed Capacity (MWelec)": "30", "CHP Enabled": "Yes", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7854", "Address": "Flixborough Wharf, Flixborough Industrial Estate, Scunthorpe", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN15 8SE", "X-coordinate": "486007", "Y-coordinate": "414482", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010116", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.619827", "long": "-0.701206", "status": "planning", "mw": 30, "ext_id": "12706"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/11/2022", "to": "11/01/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12706", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Solar 21 Renewable Energy Limited", "Site Name": "North Lincolnshire Green Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11621 & 12707", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "Yes", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7854", "Address": "Flixborough Wharf, Flixborough Industrial Estate, Scunthorpe", "County": "North Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN15 8SE", "X-coordinate": "486007", "Y-coordinate": "414482", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010116", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.619827", "long": "-0.701206", "status": "planning", "mw": 30, "ext_id": "12706"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2022-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "North Lincolnshire Green Energy Park", "name_short": "North Lincolnshire Green Energy Par...", "owner": "Solar 21 Renewable Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.619827", "long": "-0.701206", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.619827+-0.701206", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ourack", "city": "", "id": "906", "external_id": "12727", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vattenfall", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "906", "external_id": "12727", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ourack", "external_id": "12727", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Vattenfall", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.430257", "long": "-3.583832", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12727", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Vattenfall", "Site Name": "Ourack", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5949", "Installed Capacity (MWelec)": "50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "6km north of Granton-on-Spey", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "305000", "Y-coordinate": "838876", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001999", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.430257", "long": "-3.583832", "status": "planning", "mw": 50, "ext_id": "12727"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12727", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Vattenfall", "Site Name": "Ourack", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "5949", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "No", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "6km north of Granton-on-Spey", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "305000", "Y-coordinate": "838876", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00001999", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.430257", "long": "-3.583832", "status": "planning", "mw": 50, "ext_id": "12727"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ourack", "name_short": "Ourack", "owner": "Vattenfall", "state": "scotland", "country": "uk", "lat": "57.430257", "long": "-3.583832", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.430257+-3.583832", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newburn Bridge Road - Battery Storage Facility", "city": "", "id": "907", "external_id": "12729", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power Storage Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "907", "external_id": "12729", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newburn Bridge Road - Battery Storage Facility", "external_id": "12729", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "The Renewables Infrastructure Group Limited", "status": "planning", "date_first_heard": "2022-03-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.97525", "long": "-1.740618", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12729", "Record Last Updated (dd/mm/yyyy)": "28/11/2022", "Operator (or Applicant)": "Aura Power Storage Solutions", "Site Name": "Newburn Bridge Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newburn Bridge Road, Btw Flogas & Blaydon Caravan, Blaydon on Tyne", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE21 4NT", "X-coordinate": "416701", "Y-coordinate": "564546", "Planning Authority": "Gateshead Council", "Planning Application Reference": "DC/21/00922/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "31/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "31/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.97525", "long": "-1.740618", "status": "planning", "mw": 100, "ext_id": "12729"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "28/11/2022", "to": "13/02/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Aura Power Storage Solutions", "to": "The Renewables Infrastructure Group Limited", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12729", "Record Last Updated (dd/mm/yyyy)": "13/02/2023", "Operator (or Applicant)": "The Renewables Infrastructure Group Limited", "Site Name": "Newburn Bridge Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Newburn Bridge Road, Btw Flogas & Blaydon Caravan, Blaydon on Tyne", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE21 4NT", "X-coordinate": "416701", "Y-coordinate": "564546", "Planning Authority": "Gateshead Council", "Planning Application Reference": "DC/21/00922/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/08/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "31/03/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "31/03/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.97525", "long": "-1.740618", "status": "planning", "mw": 100, "ext_id": "12729"}, "current_month": "2024-01", "dates": {"first_heard": "2022-11-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2022-03-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newburn Bridge Road - Battery Storage Facility", "name_short": "Newburn Bridge Road", "owner": "The Renewables Infrastructure Group Limited", "state": "north east", "country": "uk", "lat": "54.97525", "long": "-1.740618", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.97525+-1.740618", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barlow Road, Barlow Road - Battery Storage", "city": "", "id": "908", "external_id": "12734", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "908", "external_id": "12734", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barlow Road, Barlow Road - Battery Storage", "external_id": "12734", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Vox Energy Limited", "status": "planning", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12734", "Record Last Updated (dd/mm/yyyy)": "06/09/2023", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14715", "Are they re-applying (Old REPD Ref) ": "9970", "Address": "Home Farm Barlow Road Barlow", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "2022/1257/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "08/03/2023", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 80, "ext_id": "12734"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12734", "Record Last Updated (dd/mm/yyyy)": "06/09/2023", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "14715", "Are they re-applying (Old REPD Ref) ": "9970", "Address": "Home Farm Barlow Road Barlow", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "2022/1257/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "08/03/2023", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 80, "ext_id": "12734"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barlow Road, Barlow Road - Battery Storage", "name_short": "Barlow Road, Barlow Road", "owner": "Vox Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.773171+-1.057521", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "city": "", "id": "909", "external_id": "12780", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balnacraig Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "909", "external_id": "12780", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "external_id": "12780", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Balnacraig Battery Storage Limited", "status": "planning", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.706449", "long": "-4.279", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12780", "Record Last Updated (dd/mm/yyyy)": "05/12/2022", "Operator (or Applicant)": "Balnacraig Battery Storage Limited", "Site Name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Alness Grid Sub Station, Mid Balnacraig, Alness ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV17 0XL", "X-coordinate": "264300", "Y-coordinate": "870800", "Planning Authority": "Highland Council", "Planning Application Reference": "22/05167/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.706449", "long": "-4.279", "status": "planning", "mw": 50, "ext_id": "12780"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/12/2022", "to": "19/12/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12780", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Balnacraig Battery Storage Limited", "Site Name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Alness Grid Sub Station, Mid Balnacraig, Alness ", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV17 0XL", "X-coordinate": "264300", "Y-coordinate": "870800", "Planning Authority": "Highland Council", "Planning Application Reference": "22/05167/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.706449", "long": "-4.279", "status": "planning", "mw": 50, "ext_id": "12780"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "name_short": "Alness Grid Sub Station, Mid Balnac...", "owner": "Balnacraig Battery Storage Limited", "state": "scotland", "country": "uk", "lat": "57.706449", "long": "-4.279", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.706449+-4.279", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "city": "", "id": "910", "external_id": "12789", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "85", "power_mw": "85", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "910", "external_id": "12789", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "external_id": "12789", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 85, "power_mw": 85, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-05-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.402586", "long": "-1.269129", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12789", "Record Last Updated (dd/mm/yyyy)": "05/12/2022", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "85", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Green Lane, Thurcroft, Rotherham", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S66 9JD", "X-coordinate": "448690", "Y-coordinate": "389778", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/1767", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.402586", "long": "-1.269129", "status": "planning", "mw": 85, "ext_id": "12789"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/12/2022", "to": "30/05/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "12/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "12/05/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12789", "Record Last Updated (dd/mm/yyyy)": "30/05/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "85", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Green Lane, Thurcroft, Rotherham", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S66 9JD", "X-coordinate": "448690", "Y-coordinate": "389778", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/1767", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.402586", "long": "-1.269129", "status": "planning", "mw": 85, "ext_id": "12789"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 85, "mwh_is_estimate": true, "mwh": 85, "mwh_estimate": 85, "status": "planning", "status_class": "", "date_first_heard": "2023-05-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "name_short": "Green Lane, Thurcroft - Battery Ene...", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.402586", "long": "-1.269129", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.402586+-1.269129", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "912", "external_id": "12803", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "912", "external_id": "12803", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Derehams Farm, Derehams Lane - Battery Storage", "external_id": "12803", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Capbal Limited", "status": "planning", "date_first_heard": "2023-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12803", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Capbal Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8142", "Address": "Derehams Farm, Derehams Lane, Loudwater, High Wycombe", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Buckinghamshire Council ", "Planning Application Reference": "22/08045/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 40, "ext_id": "12803"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "12/07/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Buckinghamshire Council ", "to": "Buckinghamshire Council - Wycombe Area", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "29/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "29/06/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12803", "Record Last Updated (dd/mm/yyyy)": "12/07/2023", "Operator (or Applicant)": "Capbal Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8142", "Address": "Derehams Farm, Derehams Lane, Loudwater, High Wycombe", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Buckinghamshire Council - Wycombe Area", "Planning Application Reference": "22/08045/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 40, "ext_id": "12803"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Derehams Farm, Derehams Lane - Battery Storage", "name_short": "Derehams Farm, Derehams Lane", "owner": "Capbal Limited", "state": "south east", "country": "uk", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.611399+-0.693977", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "city": "", "id": "914", "external_id": "12815", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Clinton Devon Estates", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "914", "external_id": "12815", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "external_id": "12815", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Clinton Devon Estates", "status": "planning", "date_first_heard": "2023-07-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.663611", "long": "-3.375369", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12815", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Clinton Devon Estates", "Site Name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackhill Quarry, Woodbury, Exeter", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX5 1HD", "X-coordinate": "302890", "Y-coordinate": "85785", "Planning Authority": "East Devon District Council\n", "Planning Application Reference": "22/2546/MFUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.663611", "long": "-3.375369", "status": "planning", "mw": 60, "ext_id": "12815"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "04/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/07/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12815", "Record Last Updated (dd/mm/yyyy)": "04/08/2023", "Operator (or Applicant)": "Clinton Devon Estates", "Site Name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackhill Quarry, Woodbury, Exeter", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX5 1HD", "X-coordinate": "302890", "Y-coordinate": "85785", "Planning Authority": "East Devon District Council\n", "Planning Application Reference": "22/2546/MFUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/07/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.663611", "long": "-3.375369", "status": "planning", "mw": 60, "ext_id": "12815"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-07-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "name_short": "Blackhill Quarry, Woodbury - Batter...", "owner": "Clinton Devon Estates", "state": "south west", "country": "uk", "lat": "50.663611", "long": "-3.375369", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.663611+-3.375369", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "city": "", "id": "915", "external_id": "12821", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ESB Asset Development UK Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "915", "external_id": "12821", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "external_id": "12821", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "ESB Asset Development UK Ltd", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.370264", "long": "-2.582131", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12821", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "ESB Asset Development UK Ltd", "Site Name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10715", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SW/O Chesters, Harwick", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD9 8TW", "X-coordinate": "363203", "Y-coordinate": "608629", "Planning Authority": "Scottish Borders Council", "Planning Application Reference": "ECU00003426", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.370264", "long": "-2.582131", "status": "planning", "mw": 20, "ext_id": "12821"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12821", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "ESB Asset Development UK Ltd", "Site Name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10715", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SW/O Chesters, Harwick", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD9 8TW", "X-coordinate": "363203", "Y-coordinate": "608629", "Planning Authority": "Scottish Borders Council", "Planning Application Reference": "ECU00003426", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.370264", "long": "-2.582131", "status": "planning", "mw": 20, "ext_id": "12821"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "name_short": "Chesters - Millmoor Rig Wind Farm &", "owner": "ESB Asset Development UK Ltd", "state": "scotland", "country": "uk", "lat": "55.370264", "long": "-2.582131", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.370264+-2.582131", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "city": "", "id": "916", "external_id": "12823", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Elgin Energy Es Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "916", "external_id": "12823", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "external_id": "12823", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Elgin Energy Es Co Limited", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.559904", "long": "-1.842417", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12823", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Elgin Energy Es Co Limited", "Site Name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12822", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O A90 Peterhead to Fraserburgh Road, Se/O St Fergus Village, Peterhead", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB42 3HD", "X-coordinate": "409528", "Y-coordinate": "852212", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003226", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.559904", "long": "-1.842417", "status": "planning", "mw": 20, "ext_id": "12823"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/12/2022", "to": "08/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12823", "Record Last Updated (dd/mm/yyyy)": "08/03/2023", "Operator (or Applicant)": "Elgin Energy Es Co Limited", "Site Name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12822", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O A90 Peterhead to Fraserburgh Road, Se/O St Fergus Village, Peterhead", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB42 3HD", "X-coordinate": "409528", "Y-coordinate": "852212", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003226", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/02/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.559904", "long": "-1.842417", "status": "planning", "mw": 20, "ext_id": "12823"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "name_short": "Fraserburgh Road - Kirkton Solar PV...", "owner": "Elgin Energy Es Co Limited", "state": "scotland", "country": "uk", "lat": "57.559904", "long": "-1.842417", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.559904+-1.842417", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bengrove Farm, Base Lane - Battery Storage", "city": "", "id": "917", "external_id": "12830", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Bengrove Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "917", "external_id": "12830", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bengrove Farm, Base Lane - Battery Storage", "external_id": "12830", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Bengrove Bess Limited", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.903075", "long": "-2.247495", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12830", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Bengrove Bess Limited", "Site Name": "Bengrove Farm, Base Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bengrove Farm, Base Lane, Sandhurst", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 9NU", "X-coordinate": "383069", "Y-coordinate": "222755", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "22/01231/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.903075", "long": "-2.247495", "status": "planning", "mw": 49, "ext_id": "12830"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12830", "Record Last Updated (dd/mm/yyyy)": "12/12/2022", "Operator (or Applicant)": "Bengrove Bess Limited", "Site Name": "Bengrove Farm, Base Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bengrove Farm, Base Lane, Sandhurst", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 9NU", "X-coordinate": "383069", "Y-coordinate": "222755", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "22/01231/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.903075", "long": "-2.247495", "status": "planning", "mw": 49, "ext_id": "12830"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bengrove Farm, Base Lane - Battery Storage", "name_short": "Bengrove Farm, Base Lane", "owner": "Bengrove Bess Limited", "state": "south west", "country": "uk", "lat": "51.903075", "long": "-2.247495", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.903075+-2.247495", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kirkton Energy Farm", "city": "", "id": "918", "external_id": "12876", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Kirkton Wind Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "918", "external_id": "12876", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kirkton Energy Farm", "external_id": "12876", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Kirkton Wind Farm Limited", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.589", "long": "-3.556003", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12876", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "Kirkton Wind Farm Limited", "Site Name": "Kirkton Energy Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9705", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "1800M SW Of Kirkton Cemetery, Melvich", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14", "X-coordinate": "309643", "Y-coordinate": "967827", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003244", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.589", "long": "-3.556003", "status": "planning", "mw": 20, "ext_id": "12876"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12876", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "Kirkton Wind Farm Limited", "Site Name": "Kirkton Energy Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9705", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "1800M SW Of Kirkton Cemetery, Melvich", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14", "X-coordinate": "309643", "Y-coordinate": "967827", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003244", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.589", "long": "-3.556003", "status": "planning", "mw": 20, "ext_id": "12876"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kirkton Energy Farm", "name_short": "Kirkton Energy Farm", "owner": "Kirkton Wind Farm Limited", "state": "scotland", "country": "uk", "lat": "58.589", "long": "-3.556003", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.589+-3.556003", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tomchrasky Estate Wind farm", "city": "", "id": "919", "external_id": "12877", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "E Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "919", "external_id": "12877", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tomchrasky Estate Wind farm", "external_id": "12877", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "E Power Limited", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.173078", "long": "-4.829155", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12877", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "E Power Limited", "Site Name": "Tomchrasky Estate Wind farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8364", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "900m Ne/O Beinn An T-Sidhein Dalchreichart", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV3", "X-coordinate": "229056", "Y-coordinate": "812688", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004663", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.173078", "long": "-4.829155", "status": "planning", "mw": 50, "ext_id": "12877"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12877", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "E Power Limited", "Site Name": "Tomchrasky Estate Wind farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8364", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "900m Ne/O Beinn An T-Sidhein Dalchreichart", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV3", "X-coordinate": "229056", "Y-coordinate": "812688", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004663", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.173078", "long": "-4.829155", "status": "planning", "mw": 50, "ext_id": "12877"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tomchrasky Estate Wind farm", "name_short": "Tomchrasky Estate Wind farm", "owner": "E Power Limited", "state": "scotland", "country": "uk", "lat": "57.173078", "long": "-4.829155", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.173078+-4.829155", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "St Michaels Road, Ditton Road - Battery Storage", "city": "", "id": "920", "external_id": "12904", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Shell Green Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "920", "external_id": "12904", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "St Michaels Road, Ditton Road - Battery Storage", "external_id": "12904", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 14, "power_mw": 14, "owner": "Shell Green Limited", "status": "planning", "date_first_heard": "2023-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.358703", "long": "-2.762001", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12904", "Record Last Updated (dd/mm/yyyy)": "19/12/2022", "Operator (or Applicant)": "Shell Green Limited", "Site Name": "St Michaels Road, Ditton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Of St Michaels Road Ditton Road ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA8 0TH", "X-coordinate": "349383", "Y-coordinate": "384918", "Planning Authority": "Halton Council", "Planning Application Reference": "22/00623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.358703", "long": "-2.762001", "status": "planning", "mw": 14, "ext_id": "12904"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "19/12/2022", "to": "28/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12904", "Record Last Updated (dd/mm/yyyy)": "28/11/2023", "Operator (or Applicant)": "Shell Green Limited", "Site Name": "St Michaels Road, Ditton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Of St Michaels Road Ditton Road ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "WA8 0TH", "X-coordinate": "349383", "Y-coordinate": "384918", "Planning Authority": "Halton Council", "Planning Application Reference": "22/00623/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.358703", "long": "-2.762001", "status": "planning", "mw": 14, "ext_id": "12904"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 14, "mwh_is_estimate": true, "mwh": 14, "mwh_estimate": 14, "status": "planning", "status_class": "", "date_first_heard": "2023-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "St Michaels Road, Ditton Road - Battery Storage", "name_short": "St Michaels Road, Ditton Road", "owner": "Shell Green Limited", "state": "north west", "country": "uk", "lat": "53.358703", "long": "-2.762001", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.358703+-2.762001", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "city": "", "id": "921", "external_id": "12909", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "921", "external_id": "12909", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "external_id": "12909", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "24 Power Limited", "status": "planning", "date_first_heard": "2023-05-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.810686", "long": "-1.860826", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12909", "Record Last Updated (dd/mm/yyyy)": "20/12/2022", "Operator (or Applicant)": "24 Power Limited", "Site Name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Harrop Lane, Wilsden, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD15 0BZ", "X-coordinate": "409262", "Y-coordinate": "434942", "Planning Authority": "Bradford City of", "Planning Application Reference": "22/05010/MAF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.810686", "long": "-1.860826", "status": "planning", "mw": 100, "ext_id": "12909"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/12/2022", "to": "25/05/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Bradford City of", "to": "Bradford Metropolitan District Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/05/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/05/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12909", "Record Last Updated (dd/mm/yyyy)": "25/05/2023", "Operator (or Applicant)": "24 Power Limited", "Site Name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Harrop Lane, Wilsden, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD15 0BZ", "X-coordinate": "409262", "Y-coordinate": "434942", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "22/05010/MAF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.810686", "long": "-1.860826", "status": "planning", "mw": 100, "ext_id": "12909"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-05-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "name_short": "Bradford West, Harrop Lane, Wilsden", "owner": "24 Power Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.810686", "long": "-1.860826", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.810686+-1.860826", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "J3 Business Park - Battery Energy Storage Facility", "city": "", "id": "922", "external_id": "12920", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Forepower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "922", "external_id": "12920", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "J3 Business Park - Battery Energy Storage Facility", "external_id": "12920", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Forepower Limited", "status": "planning", "date_first_heard": "2023-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.50296", "long": "-1.127826", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12920", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Forepower Limited", "Site Name": "J3 Business Park - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6979", "Address": "J3 Business Park, Wright Business Park, Balby Carr Bank, Balby, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN4 8DE", "X-coordinate": "457948", "Y-coordinate": "401050", "Planning Authority": "Doncaster Metropolitan Borough Council", "Planning Application Reference": "22/02368/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.50296", "long": "-1.127826", "status": "planning", "mw": 10, "ext_id": "12920"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2022", "to": "27/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "24/01/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12920", "Record Last Updated (dd/mm/yyyy)": "27/01/2023", "Operator (or Applicant)": "Forepower Limited", "Site Name": "J3 Business Park - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "6979", "Address": "J3 Business Park, Wright Business Park, Balby Carr Bank, Balby, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN4 8DE", "X-coordinate": "457948", "Y-coordinate": "401050", "Planning Authority": "Doncaster Metropolitan Borough Council", "Planning Application Reference": "22/02368/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/10/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "24/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.50296", "long": "-1.127826", "status": "planning", "mw": 10, "ext_id": "12920"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "J3 Business Park - Battery Energy Storage Facility", "name_short": "J3 Business Park - Battery Energy", "owner": "Forepower Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.50296", "long": "-1.127826", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.50296+-1.127826", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "923", "external_id": "12936", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coventry Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "923", "external_id": "12936", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "external_id": "12936", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Coventry Energy Storage Limited", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.386266", "long": "-1.610608", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12936", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Coventry Energy Storage Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Hodgetts Lane, Berkswell, Solihull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426599", "Y-coordinate": "276542", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2022/02581/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386266", "long": "-1.610608", "status": "planning", "mw": 49, "ext_id": "12936"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/12/2022", "to": "13/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "15230", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12936", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Coventry Energy Storage Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15230", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Hodgetts Lane, Berkswell, Solihull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426599", "Y-coordinate": "276542", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2022/02581/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386266", "long": "-1.610608", "status": "planning", "mw": 49, "ext_id": "12936"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "name_short": "Hodgetts Lane, Berkswell - Electric...", "owner": "Coventry Energy Storage Limited", "state": "west midlands", "country": "uk", "lat": "52.386266", "long": "-1.610608", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.386266+-1.610608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "city": "", "id": "924", "external_id": "12941", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Low Carbon Solar Park 20 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "924", "external_id": "12941", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "external_id": "12941", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Low Carbon Solar Park 20 Limited", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.170471", "long": "0.351573", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12941", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Low Carbon Solar Park 20 Limited", "Site Name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12940", "Installed Capacity (MWelec)": "20", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Reeds Solar Farm Alders Road Colts Hill", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "TN12 6SR", "X-coordinate": "564495", "Y-coordinate": "143876", "Planning Authority": "Tunbridge Wells Council", "Planning Application Reference": "22/03563/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.170471", "long": "0.351573", "status": "planning", "mw": 20, "ext_id": "12941"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12941", "Record Last Updated (dd/mm/yyyy)": "22/12/2022", "Operator (or Applicant)": "Low Carbon Solar Park 20 Limited", "Site Name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12940", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Reeds Solar Farm Alders Road Colts Hill", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "TN12 6SR", "X-coordinate": "564495", "Y-coordinate": "143876", "Planning Authority": "Tunbridge Wells Council", "Planning Application Reference": "22/03563/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.170471", "long": "0.351573", "status": "planning", "mw": 20, "ext_id": "12941"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "name_short": "Reeds Solar Farm, Alders Road - Sol...", "owner": "Low Carbon Solar Park 20 Limited", "state": "south east", "country": "uk", "lat": "51.170471", "long": "0.351573", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.170471+0.351573", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Long Pasture Farm, Little Stainton - Solar Farm", "city": "", "id": "925", "external_id": "12952", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Electric Works", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "925", "external_id": "12952", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Long Pasture Farm, Little Stainton - Solar Farm", "external_id": "12952", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Electric Works", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.57062", "long": "-1.471781", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12952", "Record Last Updated (dd/mm/yyyy)": "23/12/2022", "Operator (or Applicant)": "Electric Works", "Site Name": "Long Pasture Farm, Little Stainton - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12951", "Installed Capacity (MWelec)": "40", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The South Of Long Pasture Farm Little Stainton", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS21 1HW", "X-coordinate": "434248", "Y-coordinate": "519617", "Planning Authority": "Darlington Council", "Planning Application Reference": "22/01329/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.57062", "long": "-1.471781", "status": "planning", "mw": 40, "ext_id": "12952"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/12/2022", "to": "14/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "10/08/2030", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12952", "Record Last Updated (dd/mm/yyyy)": "14/08/2023", "Operator (or Applicant)": "Electric Works", "Site Name": "Long Pasture Farm, Little Stainton - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12951", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The South Of Long Pasture Farm Little Stainton", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS21 1HW", "X-coordinate": "434248", "Y-coordinate": "519617", "Planning Authority": "Darlington Council", "Planning Application Reference": "22/01329/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "10/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "10/08/2030", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.57062", "long": "-1.471781", "status": "planning", "mw": 40, "ext_id": "12952"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Long Pasture Farm, Little Stainton - Solar Farm", "name_short": "Long Pasture Farm, Little Stainton ...", "owner": "Electric Works", "state": "north east", "country": "uk", "lat": "54.57062", "long": "-1.471781", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.57062+-1.471781", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hillside Farm, Lancaster Road - Battery Storage", "city": "", "id": "927", "external_id": "12964", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Hamilton March", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "927", "external_id": "12964", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hillside Farm, Lancaster Road - Battery Storage", "external_id": "12964", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Hamilton March", "status": "planning", "date_first_heard": "2023-09-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.03864", "long": "-2.852232", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12964", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Hamilton March", "Site Name": "Hillside Farm, Lancaster Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "11948", "Address": "Hillside Farm Lancaster Road Heaton With Oxcliffe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": " LA3 3ET", "X-coordinate": "344285", "Y-coordinate": "460632", "Planning Authority": "Lancaster Council", "Planning Application Reference": "22/01317/FUL\ufffd", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.03864", "long": "-2.852232", "status": "planning", "mw": 100, "ext_id": "12964"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/01/2023", "to": "28/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "19/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12964", "Record Last Updated (dd/mm/yyyy)": "28/09/2023", "Operator (or Applicant)": "Hamilton March", "Site Name": "Hillside Farm, Lancaster Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "11948", "Address": "Hillside Farm Lancaster Road Heaton With Oxcliffe ", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": " LA3 3ET", "X-coordinate": "344285", "Y-coordinate": "460632", "Planning Authority": "Lancaster Council", "Planning Application Reference": "22/01317/FUL\ufffd", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.03864", "long": "-2.852232", "status": "planning", "mw": 100, "ext_id": "12964"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-09-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hillside Farm, Lancaster Road - Battery Storage", "name_short": "Hillside Farm, Lancaster Road", "owner": "Hamilton March", "state": "north west", "country": "uk", "lat": "54.03864", "long": "-2.852232", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.03864+-2.852232", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Welkin Mill, Welkin Road - Battery Storage", "city": "", "id": "928", "external_id": "12982", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "928", "external_id": "12982", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Welkin Mill, Welkin Road - Battery Storage", "external_id": "12982", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Noriker Power Limited", "status": "planning", "date_first_heard": "2023-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.417166", "long": "-2.136351", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12982", "Record Last Updated (dd/mm/yyyy)": "05/01/2023", "Operator (or Applicant)": "Noriker Power Limited", "Site Name": "Welkin Mill, Welkin Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8055", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391035", "Y-coordinate": "391160", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/087394", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.417166", "long": "-2.136351", "status": "planning", "mw": 49, "ext_id": "12982"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/01/2023", "to": "23/08/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "01/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12982", "Record Last Updated (dd/mm/yyyy)": "23/08/2023", "Operator (or Applicant)": "Noriker Power Limited", "Site Name": "Welkin Mill, Welkin Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8055", "Address": "Welkin Mill, Welkin Road, Bredbury, Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391035", "Y-coordinate": "391160", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/087394", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "01/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.417166", "long": "-2.136351", "status": "planning", "mw": 49, "ext_id": "12982"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Welkin Mill, Welkin Road - Battery Storage", "name_short": "Welkin Mill, Welkin Road", "owner": "Noriker Power Limited", "state": "north west", "country": "uk", "lat": "53.417166", "long": "-2.136351", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.417166+-2.136351", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Scawd Law Wind Farm", "city": "", "id": "929", "external_id": "13000", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Fred Olsen Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "929", "external_id": "13000", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Scawd Law Wind Farm", "external_id": "13000", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Fred Olsen Renewables", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.650828", "long": "-3.013502", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13000", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Fred Olsen Renewables", "Site Name": "Scawd Law Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8002", "Installed Capacity (MWelec)": "12", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the north east of Innerleithen approximately 3 km to the east of the B709 and 4 km north of the A72", "County": "Scottish Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH43", "X-coordinate": "336319", "Y-coordinate": "640165", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002111", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.650828", "long": "-3.013502", "status": "planning", "mw": 12, "ext_id": "13000"}, "first_month": "2023-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13000", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Fred Olsen Renewables", "Site Name": "Scawd Law Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8002", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the north east of Innerleithen approximately 3 km to the east of the B709 and 4 km north of the A72", "County": "Scottish Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH43", "X-coordinate": "336319", "Y-coordinate": "640165", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002111", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.650828", "long": "-3.013502", "status": "planning", "mw": 12, "ext_id": "13000"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Scawd Law Wind Farm", "name_short": "Scawd Law Wind Farm", "owner": "Fred Olsen Renewables", "state": "scotland", "country": "uk", "lat": "55.650828", "long": "-3.013502", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.650828+-3.013502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eccles Substation, Eccles - Battery Energy Storage System", "city": "", "id": "930", "external_id": "13003", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Eccles Grid Stability Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "930", "external_id": "13003", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Eccles Substation, Eccles - Battery Energy Storage System", "external_id": "13003", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Eccles Grid Stability Limited", "status": "planning", "date_first_heard": "2023-06-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.666218", "long": "-2.308354", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13003", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Eccles Grid Stability Limited", "Site Name": "Eccles Substation, Eccles - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, Eccles, Coldstream", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 4LU", "X-coordinate": "380701", "Y-coordinate": "641455", "Planning Authority": "Scottish Borders Council", "Planning Application Reference": "22/01988/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.666218", "long": "-2.308354", "status": "planning", "mw": 50, "ext_id": "13003"}, "first_month": "2023-01", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2023", "to": "30/06/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "15/06/2023", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "15/06/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13003", "Record Last Updated (dd/mm/yyyy)": "30/06/2023", "Operator (or Applicant)": "Eccles Grid Stability Limited", "Site Name": "Eccles Substation, Eccles - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, Eccles, Coldstream", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 4LU", "X-coordinate": "380701", "Y-coordinate": "641455", "Planning Authority": "Scottish Borders Council", "Planning Application Reference": "22/01988/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/06/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.666218", "long": "-2.308354", "status": "planning", "mw": 50, "ext_id": "13003"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-06-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Eccles Substation, Eccles - Battery Energy Storage System", "name_short": "Eccles Substation, Eccles - Battery", "owner": "Eccles Grid Stability Limited", "state": "scotland", "country": "uk", "lat": "55.666218", "long": "-2.308354", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.666218+-2.308354", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Mount Pleasant Farm, Green Lane - Battery Storage", "city": "", "id": "931", "external_id": "13011", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Barton Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "931", "external_id": "13011", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Mount Pleasant Farm, Green Lane - Battery Storage", "external_id": "13011", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Barton Battery Storage", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.852764", "long": "-2.724219", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13011", "Record Last Updated (dd/mm/yyyy)": "12/01/2023", "Operator (or Applicant)": "Barton Battery Storage", "Site Name": "Mount Pleasant Farm, Green Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent Mount Pleasant Farm, Green Lane, Barton", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR3 0RP", "X-coordinate": "352457", "Y-coordinate": "439858", "Planning Authority": "Preston Council", "Planning Application Reference": " 06/2022/0763", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.852764", "long": "-2.724219", "status": "planning", "mw": 45, "ext_id": "13011"}, "first_month": "2023-01", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2023", "to": "30/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "03/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13011", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Barton Battery Storage", "Site Name": "Mount Pleasant Farm, Green Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adjacent Mount Pleasant Farm, Green Lane, Barton", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "PR3 0RP", "X-coordinate": "352457", "Y-coordinate": "439858", "Planning Authority": "Preston Council", "Planning Application Reference": " 06/2022/0763", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.852764", "long": "-2.724219", "status": "planning", "mw": 45, "ext_id": "13011"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Mount Pleasant Farm, Green Lane - Battery Storage", "name_short": "Mount Pleasant Farm, Green Lane", "owner": "Barton Battery Storage", "state": "north west", "country": "uk", "lat": "53.852764", "long": "-2.724219", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.852764+-2.724219", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Garn Fach Wind Farm", "city": "", "id": "1076", "external_id": "7705", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1076", "external_id": "7705", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Garn Fach Wind Farm", "external_id": "7705", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "EDF Renewables", "status": "planning", "date_first_heard": "2023-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.413378", "long": "-3.39479", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7705", "Record Last Updated (dd/mm/yyyy)": "11/05/2023", "Operator (or Applicant)": "EDF Renewables", "Site Name": "Garn Fach Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7704", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land approximately 2km west of Llaithddu, 5km north-west of the village of Llanbadarn Fynydd and 8km to the south of Newtown, Powys, Wales", "County": "Powys", "Region": "Wales", "Country": "Wales", "Post Code": "LD1 6YR", "X-coordinate": "305228", "Y-coordinate": "280402", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3244499", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.413378", "long": "-3.39479", "status": "planning", "mw": 50, "ext_id": "7705"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/05/2023", "to": "26/05/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7705", "Record Last Updated (dd/mm/yyyy)": "26/05/2022", "Operator (or Applicant)": "EDF Renewables", "Site Name": "Garn Fach Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7704", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land approximately 2km west of Llaithddu, 5km north-west of the village of Llanbadarn Fynydd and 8km to the south of Newtown, Powys, Wales", "County": "Powys", "Region": "Wales", "Country": "Wales", "Post Code": "LD1 6YR", "X-coordinate": "305228", "Y-coordinate": "280402", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3244499", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.413378", "long": "-3.39479", "status": "planning", "mw": 50, "ext_id": "7705"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Garn Fach Wind Farm", "name_short": "Garn Fach Wind Farm", "owner": "EDF Renewables", "state": "wales", "country": "uk", "lat": "52.413378", "long": "-3.39479", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.413378+-3.39479", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Larks Green Solar Farm", "city": "", "id": "1077", "external_id": "8052", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Enso Energy / Iron Acton Green", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1077", "external_id": "8052", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Larks Green Solar Farm", "external_id": "8052", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Enso Energy / Iron Acton Green", "status": "planning", "date_first_heard": "2021-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.577938", "long": "-2.47741", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "8052", "Record Last Updated (dd/mm/yyyy)": "06/06/2023", "Operator (or Applicant)": "Enso Energy / Iron Acton Green", "Site Name": "Larks Green Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8051", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North and West Of Iron Acto, Iron Acton, Bristol, Avon", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "367014", "Y-coordinate": "186672", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P20/13909/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.577938", "long": "-2.47741", "status": "planning", "mw": 49, "ext_id": "8052"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/06/2023", "to": "30/09/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "8052", "Record Last Updated (dd/mm/yyyy)": "30/09/2020", "Operator (or Applicant)": "Enso Energy / Iron Acton Green", "Site Name": "Larks Green Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8051", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land North and West Of Iron Acto, Iron Acton, Bristol, Avon", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "367014", "Y-coordinate": "186672", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P20/13909/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/08/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.577938", "long": "-2.47741", "status": "planning", "mw": 49, "ext_id": "8052"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Larks Green Solar Farm", "name_short": "Larks Green Solar Farm", "owner": "Enso Energy / Iron Acton Green", "state": "south west", "country": "uk", "lat": "51.577938", "long": "-2.47741", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.577938+-2.47741", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Carrs - Energy storage facility", "city": "", "id": "1079", "external_id": "9207", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Meadow Farm Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1079", "external_id": "9207", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Carrs - Meadow Farm Energy storage facility", "external_id": "9207", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "BayWa r.e.", "status": "planning", "date_first_heard": "2023-09-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.587889", "long": "-1.381776", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9207", "Record Last Updated (dd/mm/yyyy)": "05/05/2023", "Operator (or Applicant)": "Meadow Farm Battery Limited", "Site Name": "The Carrs - Energy storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Se/O The Carrs, Fishing Lakes, Letch Lane, Carlton, Stockton on Tees", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS21 1ED", "X-coordinate": "440050", "Y-coordinate": "521586", "Planning Authority": "Stockton on Tees Borough Council ", "Planning Application Reference": "23/0752/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.587889", "long": "-1.381776", "status": "planning", "mw": 60, "ext_id": "9207"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/05/2023", "to": "26/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Meadow Farm Battery Limited", "to": "BayWa r.e.", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "The Carrs - Energy storage facility", "to": "The Carrs - Meadow Farm Energy storage facility", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "60", "to": "57", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/09/2026", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 60, "to": 57, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9207", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "BayWa r.e.", "Site Name": "The Carrs - Meadow Farm Energy storage facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "57", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Se/O The Carrs, Fishing Lakes, Letch Lane, Carlton, Stockton on Tees", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS21 1ED", "X-coordinate": "440050", "Y-coordinate": "521586", "Planning Authority": "Stockton on Tees Borough Council ", "Planning Application Reference": "23/0752/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.587889", "long": "-1.381776", "status": "planning", "mw": 57, "ext_id": "9207"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-09-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Carrs - Meadow Farm Energy storage facility", "name_short": "The Carrs - Meadow Farm Energy", "owner": "BayWa r.e.", "state": "north east", "country": "uk", "lat": "54.587889", "long": "-1.381776", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.587889+-1.381776", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "South Pargillis - Battery Storage", "city": "", "id": "1080", "external_id": "9564", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Renewable Connections Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1080", "external_id": "9564", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "South Pargillis - Battery Storage", "external_id": "9564", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 42, "power_mw": 42, "owner": "Renewable Connections Limited", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.049506", "long": "-3.381502", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9564", "Record Last Updated (dd/mm/yyyy)": "14/06/2023", "Operator (or Applicant)": "Renewable Connections Limited", "Site Name": "South Pargillis - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Growforth Limited, South Pargillis, Clockluine Road, Hillend, Dunfermline", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY11 7HS", "X-coordinate": "314048", "Y-coordinate": "684932", "Planning Authority": "Fife Council", "Planning Application Reference": "22/03945/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.049506", "long": "-3.381502", "status": "planning", "mw": 42, "ext_id": "9564"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "14/06/2023", "to": "09/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9564", "Record Last Updated (dd/mm/yyyy)": "09/09/2021", "Operator (or Applicant)": "Renewable Connections Limited", "Site Name": "South Pargillis - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Growforth Limited, South Pargillis, Clockluine Road, Hillend, Dunfermline", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY11 7HS", "X-coordinate": "314048", "Y-coordinate": "684932", "Planning Authority": "Fife Council", "Planning Application Reference": "22/03945/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.049506", "long": "-3.381502", "status": "planning", "mw": 42, "ext_id": "9564"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 42, "mwh_is_estimate": true, "mwh": 42, "mwh_estimate": 42, "status": "planning", "status_class": "", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "South Pargillis - Battery Storage", "name_short": "South Pargillis", "owner": "Renewable Connections Limited", "state": "scotland", "country": "uk", "lat": "56.049506", "long": "-3.381502", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.049506+-3.381502", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thurleigh Road - Battery Energy Storage", "city": "", "id": "1081", "external_id": "9651", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "69", "power_mw": "69", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1081", "external_id": "9651", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Thurleigh Road - Battery Energy Storage", "external_id": "9651", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 69, "power_mw": 69, "owner": "Pathfinder Clean Energy UK Dev Limited", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.179248", "long": "-0.501493", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9651", "Record Last Updated (dd/mm/yyyy)": "30/06/2023", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Thurleigh Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "69", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thurleigh Road, Milton Ernest, Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK41 6AB", "X-coordinate": "502559", "Y-coordinate": "254502", "Planning Authority": "Bedford Borough Council", "Planning Application Reference": "23/01139/MAF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.179248", "long": "-0.501493", "status": "planning", "mw": 69, "ext_id": "9651"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "30/06/2023", "to": "20/09/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9651", "Record Last Updated (dd/mm/yyyy)": "20/09/2021", "Operator (or Applicant)": "Pathfinder Clean Energy UK Dev Limited", "Site Name": "Thurleigh Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "69", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thurleigh Road, Milton Ernest, Bedford", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "MK41 6AB", "X-coordinate": "502559", "Y-coordinate": "254502", "Planning Authority": "Bedford Borough Council", "Planning Application Reference": "23/01139/MAF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.179248", "long": "-0.501493", "status": "planning", "mw": 69, "ext_id": "9651"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 69, "mwh_is_estimate": true, "mwh": 69, "mwh_estimate": 69, "status": "planning", "status_class": "", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Thurleigh Road - Battery Energy Storage", "name_short": "Thurleigh Road", "owner": "Pathfinder Clean Energy UK Dev Limited", "state": "eastern", "country": "uk", "lat": "52.179248", "long": "-0.501493", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.179248+-0.501493", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "city": "", "id": "1082", "external_id": "9796", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1082", "external_id": "9796", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "external_id": "9796", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Ridge Clean Energy Limited", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.880617", "long": "-1.156989", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9796", "Record Last Updated (dd/mm/yyyy)": "24/02/2023", "Operator (or Applicant)": "Ridge Clean Energy Limited", "Site Name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9795", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fields Farm Asher Lane Ruddington ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG11 6JX", "X-coordinate": "456829", "Y-coordinate": "331794", "Planning Authority": "Rushcliffe Borough Council", "Planning Application Reference": "23/00254/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.880617", "long": "-1.156989", "status": "planning", "mw": 49, "ext_id": "9796"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2023", "to": "13/10/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "02/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9796", "Record Last Updated (dd/mm/yyyy)": "13/10/2021", "Operator (or Applicant)": "Ridge Clean Energy Limited", "Site Name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9795", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fields Farm Asher Lane Ruddington ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG11 6JX", "X-coordinate": "456829", "Y-coordinate": "331794", "Planning Authority": "Rushcliffe Borough Council", "Planning Application Reference": "23/00254/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.880617", "long": "-1.156989", "status": "planning", "mw": 49, "ext_id": "9796"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "name_short": "Fair Oaks Renewable Energy Park - S...", "owner": "Ridge Clean Energy Limited", "state": "east midlands", "country": "uk", "lat": "52.880617", "long": "-1.156989", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.880617+-1.156989", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tontine Road - Battery Energy Storage System", "city": "", "id": "1083", "external_id": "9819", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "Coriolis Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1083", "external_id": "9819", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tontine Road - Battery Energy Storage System", "external_id": "9819", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "Coriolis Energy", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.536593", "long": "-2.720862", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9819", "Record Last Updated (dd/mm/yyyy)": "31/01/2023", "Operator (or Applicant)": "Coriolis Energy", "Site Name": "Tontine Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Ashton Hall, Tontine Road, Road Up Holland, Wigan", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "WN8 0NF.", "X-coordinate": "352321", "Y-coordinate": "404680", "Planning Authority": "West Lancashire Borough Council", "Planning Application Reference": "2022/1368/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.536593", "long": "-2.720862", "status": "planning", "mw": 70, "ext_id": "9819"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2023", "to": "19/10/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9819", "Record Last Updated (dd/mm/yyyy)": "19/10/2021", "Operator (or Applicant)": "Coriolis Energy", "Site Name": "Tontine Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Ashton Hall, Tontine Road, Road Up Holland, Wigan", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "WN8 0NF.", "X-coordinate": "352321", "Y-coordinate": "404680", "Planning Authority": "West Lancashire Borough Council", "Planning Application Reference": "2022/1368/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.536593", "long": "-2.720862", "status": "planning", "mw": 70, "ext_id": "9819"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tontine Road - Battery Energy Storage System", "name_short": "Tontine Road - Battery", "owner": "Coriolis Energy", "state": "north west", "country": "uk", "lat": "53.536593", "long": "-2.720862", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.536593+-2.720862", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Common Farm - Solar Farm & Battery Storage", "city": "", "id": "1084", "external_id": "9877", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Banks Renewable", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1084", "external_id": "9877", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Common Farm - Solar Farm & Battery Storage", "external_id": "9877", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Banks Renewable", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.372195", "long": "-1.247405", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9877", "Record Last Updated (dd/mm/yyyy)": "13/07/2023", "Operator (or Applicant)": "Banks Renewable", "Site Name": "Common Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9787", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Common Farm, Todwick Road, Dinnington, Rotherham", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S25 1ZX", "X-coordinate": "450170", "Y-coordinate": "386412", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/1203", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.372195", "long": "-1.247405", "status": "planning", "mw": 49, "ext_id": "9877"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/07/2023", "to": "01/11/2021", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9877", "Record Last Updated (dd/mm/yyyy)": "01/11/2021", "Operator (or Applicant)": "Banks Renewable", "Site Name": "Common Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9787", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Common Farm, Todwick Road, Dinnington, Rotherham", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S25 1ZX", "X-coordinate": "450170", "Y-coordinate": "386412", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2022/1203", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.372195", "long": "-1.247405", "status": "planning", "mw": 49, "ext_id": "9877"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Common Farm - Solar Farm & Battery Storage", "name_short": "Common Farm - Solar Farm &", "owner": "Banks Renewable", "state": "yorkshire and humber", "country": "uk", "lat": "53.372195", "long": "-1.247405", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.372195+-1.247405", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Post Farm, Lytchett Minster - Battery Energy Storage", "city": "", "id": "1085", "external_id": "10291", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "S4N Lytchett Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1085", "external_id": "10291", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Post Farm, Lytchett Minster - Battery Energy Storage", "external_id": "10291", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 32, "power_mw": 32, "owner": "S4N Lytchett Limited", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.742116", "long": "-2.045484", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10291", "Record Last Updated (dd/mm/yyyy)": "31/05/2023", "Operator (or Applicant)": "S4N Lytchett Limited", "Site Name": "Post Farm, Lytchett Minster - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Post Farm Lytchett Minster Poole ", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH16 6AB", "X-coordinate": "396887", "Y-coordinate": "93613", "Planning Authority": "Purbeck District Council", "Planning Application Reference": "P/FUL/2023/02819", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.742116", "long": "-2.045484", "status": "planning", "mw": 32, "ext_id": "10291"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/05/2023", "to": "24/01/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10291", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "S4N Lytchett Limited", "Site Name": "Post Farm, Lytchett Minster - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "32", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Post Farm Lytchett Minster Poole ", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH16 6AB", "X-coordinate": "396887", "Y-coordinate": "93613", "Planning Authority": "Purbeck District Council", "Planning Application Reference": "P/FUL/2023/02819", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.742116", "long": "-2.045484", "status": "planning", "mw": 32, "ext_id": "10291"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 32, "mwh_is_estimate": true, "mwh": 32, "mwh_estimate": 32, "status": "planning", "status_class": "", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Post Farm, Lytchett Minster - Battery Energy Storage", "name_short": "Post Farm, Lytchett Minster", "owner": "S4N Lytchett Limited", "state": "south west", "country": "uk", "lat": "50.742116", "long": "-2.045484", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.742116+-2.045484", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Huncoat Power Station - Battery Storage", "city": "", "id": "1086", "external_id": "10516", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1086", "external_id": "10516", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Huncoat Power Station - Battery Storage", "external_id": "10516", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "24 Power Limited", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.777226", "long": "-2.330459", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10516", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "24 Power Limited", "Site Name": "Huncoat Power Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13080", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of the A56 and to the Southwest of Junction 8 of the M65, east of the site of the former Huncoat Power Station", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB11 5QX", "X-coordinate": "378320", "Y-coordinate": "431261", "Planning Authority": "Burnley Borough Council", "Planning Application Reference": "FUL/2021/0601", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "18/01/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.777226", "long": "-2.330459", "status": "planning", "mw": 50, "ext_id": "10516"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "23/01/2023", "to": "01/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10516", "Record Last Updated (dd/mm/yyyy)": "01/02/2022", "Operator (or Applicant)": "24 Power Limited", "Site Name": "Huncoat Power Station - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "13080", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of the A56 and to the Southwest of Junction 8 of the M65, east of the site of the former Huncoat Power Station", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB11 5QX", "X-coordinate": "378320", "Y-coordinate": "431261", "Planning Authority": "Burnley Borough Council", "Planning Application Reference": "FUL/2021/0601", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "18/01/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.777226", "long": "-2.330459", "status": "planning", "mw": 50, "ext_id": "10516"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Huncoat Power Station - Battery Storage", "name_short": "Huncoat Power Station", "owner": "24 Power Limited", "state": "north west", "country": "uk", "lat": "53.777226", "long": "-2.330459", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.777226+-2.330459", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Benthead Farm - Solar Farm & Battery Storage", "city": "", "id": "1087", "external_id": "10542", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "31", "power_mw": "31", "customer": "", "owner": "Locogen Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1087", "external_id": "10542", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Benthead Farm - Solar Farm & Battery Storage", "external_id": "10542", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 31, "power_mw": 31, "owner": "Locogen Limited", "status": "planning", "date_first_heard": "2023-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.682957", "long": "-4.648455", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10542", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "Locogen Limited", "Site Name": "Benthead Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10541", "Installed Capacity (MWelec)": "31.1", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Benhead Farm, Kilwinning", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA13 7RU", "X-coordinate": "233587", "Y-coordinate": "646455", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004702", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.682957", "long": "-4.648455", "status": "planning", "mw": 31, "ext_id": "10542"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/02/2023", "to": "03/02/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/08/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10542", "Record Last Updated (dd/mm/yyyy)": "03/02/2022", "Operator (or Applicant)": "Locogen Limited", "Site Name": "Benthead Farm - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10541", "Installed Capacity (MWelec)": "31.1", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Benhead Farm, Kilwinning", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA13 7RU", "X-coordinate": "233587", "Y-coordinate": "646455", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004702", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/08/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.682957", "long": "-4.648455", "status": "planning", "mw": 31, "ext_id": "10542"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 31, "mwh_is_estimate": true, "mwh": 31, "mwh_estimate": 31, "status": "planning", "status_class": "", "date_first_heard": "2023-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Benthead Farm - Solar Farm & Battery Storage", "name_short": "Benthead Farm - Solar Farm &", "owner": "Locogen Limited", "state": "scotland", "country": "uk", "lat": "55.682957", "long": "-4.648455", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.682957+-4.648455", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Windyhill Battery Storage Facility", "city": "", "id": "1088", "external_id": "10596", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Energy GridPower Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1088", "external_id": "10596", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Windyhill Battery Storage Facility", "external_id": "10596", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Energy GridPower Ltd", "status": "planning", "date_first_heard": "2022-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.929502", "long": "-4.372131", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10596", "Record Last Updated (dd/mm/yyyy)": "15/07/2022", "Operator (or Applicant)": "Energy GridPower Ltd", "Site Name": "Windyhill Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Windyhill, Baljaffray Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G61 4RP", "X-coordinate": "251896", "Y-coordinate": "673257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003361", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/06/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.929502", "long": "-4.372131", "status": "planning", "mw": 200, "ext_id": "10596"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "15/07/2022", "to": "09/02/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10596", "Record Last Updated (dd/mm/yyyy)": "09/02/2022", "Operator (or Applicant)": "Energy GridPower Ltd", "Site Name": "Windyhill Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Windyhill, Baljaffray Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G61 4RP", "X-coordinate": "251896", "Y-coordinate": "673257", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003361", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/10/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "16/06/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "16/06/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.929502", "long": "-4.372131", "status": "planning", "mw": 200, "ext_id": "10596"}, "current_month": "2024-01", "dates": {"first_heard": "2022-07-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2022-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Windyhill Battery Storage Facility", "name_short": "Windyhill", "owner": "Energy GridPower Ltd", "state": "scotland", "country": "uk", "lat": "55.929502", "long": "-4.372131", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.929502+-4.372131", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Earraghail Renewable Energy Development", "city": "", "id": "1089", "external_id": "10712", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1089", "external_id": "10712", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Earraghail Renewable Energy Development", "external_id": "10712", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "ScottishPower Renewables", "status": "planning", "date_first_heard": "2022-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.818067", "long": "-5.376614", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10712", "Record Last Updated (dd/mm/yyyy)": "02/03/2022", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Earraghail Renewable Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7873", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land approximately 1.2km south of Tarbert and 1.1km north of Skipness, Argyll & Bute", "County": "Argyll and Bute", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "188557", "Y-coordinate": "663472", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003421", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.818067", "long": "-5.376614", "status": "planning", "mw": 25, "ext_id": "10712"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10712", "Record Last Updated (dd/mm/yyyy)": "02/03/2022", "Operator (or Applicant)": "ScottishPower Renewables", "Site Name": "Earraghail Renewable Energy Development", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7873", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land approximately 1.2km south of Tarbert and 1.1km north of Skipness, Argyll & Bute", "County": "Argyll and Bute", "Region": "Scotland", "Country": "Scotland", "Post Code": "", "X-coordinate": "188557", "Y-coordinate": "663472", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003421", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.818067", "long": "-5.376614", "status": "planning", "mw": 25, "ext_id": "10712"}, "current_month": "2024-01", "dates": {"first_heard": "2022-03-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2022-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Earraghail Renewable Energy Development", "name_short": "Earraghail Renewable Energy Develop...", "owner": "ScottishPower Renewables", "state": "scotland", "country": "uk", "lat": "55.818067", "long": "-5.376614", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.818067+-5.376614", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Smithyard Lane - Battery Storage", "city": "", "id": "1090", "external_id": "10766", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Conrad Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1090", "external_id": "10766", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Smithyard Lane - Battery Storage", "external_id": "10766", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Conrad Energy Limited", "status": "planning", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.168059", "long": "-3.342909", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10766", "Record Last Updated (dd/mm/yyyy)": "16/02/2023", "Operator (or Applicant)": "Conrad Energy Limited", "Site Name": "Smithyard Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "adjacent to Gas Substation, Smithyard Lane, Williton ", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA23 0NA", "X-coordinate": "306205", "Y-coordinate": "141837", "Planning Authority": "Somerset West And Taunton", "Planning Application Reference": "3/39/22/007 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.168059", "long": "-3.342909", "status": "planning", "mw": 15, "ext_id": "10766"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/02/2023", "to": "09/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10766", "Record Last Updated (dd/mm/yyyy)": "09/03/2022", "Operator (or Applicant)": "Conrad Energy Limited", "Site Name": "Smithyard Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "adjacent to Gas Substation, Smithyard Lane, Williton ", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "TA23 0NA", "X-coordinate": "306205", "Y-coordinate": "141837", "Planning Authority": "Somerset West And Taunton", "Planning Application Reference": "3/39/22/007 ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/02/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/02/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.168059", "long": "-3.342909", "status": "planning", "mw": 15, "ext_id": "10766"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Smithyard Lane - Battery Storage", "name_short": "Smithyard Lane", "owner": "Conrad Energy Limited", "state": "south west", "country": "uk", "lat": "51.168059", "long": "-3.342909", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.168059+-3.342909", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ballingall Farm, Leslie - Battery Energy Storage System", "city": "", "id": "1091", "external_id": "10825", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "43", "power_mw": "43", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1091", "external_id": "10825", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ballingall Farm, Leslie - Battery Energy Storage System", "external_id": "10825", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 43, "power_mw": 43, "owner": "EcoDev Group Limited", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.21286", "long": "-3.21106", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10825", "Record Last Updated (dd/mm/yyyy)": "25/05/2023", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Ballingall Farm, Leslie - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "43", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ballingall Farm, Leslie, Glenrothes ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY6 3HD", "X-coordinate": "324983", "Y-coordinate": "702913", "Planning Authority": "Fife Council", "Planning Application Reference": "23/00971/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.21286", "long": "-3.21106", "status": "planning", "mw": 43, "ext_id": "10825"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/05/2023", "to": "18/03/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "14/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10825", "Record Last Updated (dd/mm/yyyy)": "18/03/2022", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Ballingall Farm, Leslie - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "43", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ballingall Farm, Leslie, Glenrothes ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY6 3HD", "X-coordinate": "324983", "Y-coordinate": "702913", "Planning Authority": "Fife Council", "Planning Application Reference": "23/00971/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.21286", "long": "-3.21106", "status": "planning", "mw": 43, "ext_id": "10825"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 43, "mwh_is_estimate": true, "mwh": 43, "mwh_estimate": 43, "status": "planning", "status_class": "", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ballingall Farm, Leslie - Battery Energy Storage System", "name_short": "Ballingall Farm, Leslie - Battery", "owner": "EcoDev Group Limited", "state": "scotland", "country": "uk", "lat": "56.21286", "long": "-3.21106", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.21286+-3.21106", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bolney Substation - Battery Storage", "city": "", "id": "1092", "external_id": "10843", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "264", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1092", "external_id": "10843", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bolney Substation - Battery Storage", "external_id": "10843", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 264, "power_mw": 264, "owner": "One Planet Developments Limited", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.976809", "long": "-0.228662", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10843", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Bolney Substation - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "264", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land off Bob Lane, North Lodge, Twineham, Haywards Heath", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "RH17 5NH", "X-coordinate": "524452", "Y-coordinate": "121204", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/23/0769", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.976809", "long": "-0.228662", "status": "planning", "mw": 264, "ext_id": "10843"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/05/2023", "to": "22/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10843", "Record Last Updated (dd/mm/yyyy)": "22/03/2022", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Bolney Substation - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "264", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land off Bob Lane, North Lodge, Twineham, Haywards Heath", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "RH17 5NH", "X-coordinate": "524452", "Y-coordinate": "121204", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/23/0769", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.976809", "long": "-0.228662", "status": "planning", "mw": 264, "ext_id": "10843"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 264, "mwh_is_estimate": true, "mwh": 264, "mwh_estimate": 264, "status": "planning", "status_class": "", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bolney Substation - Battery Storage", "name_short": "Bolney Substation", "owner": "One Planet Developments Limited", "state": "south east", "country": "uk", "lat": "50.976809", "long": "-0.228662", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.976809+-0.228662", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Station Lane, Burton Leonard - Battery Energy Storage System", "city": "", "id": "1093", "external_id": "10893", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "33", "power_mw": "33", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1093", "external_id": "10893", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wormald Green - Battery Energy Storage System", "external_id": "10893", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 33, "power_mw": 33, "owner": "Harmony Energy Limited", "status": "construction", "date_first_heard": "2022-09-26", "start_construction": "2023-08-26", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.075167", "long": "-1.523157", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10893", "Record Last Updated (dd/mm/yyyy)": "27/09/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Station Lane, Burton Leonard - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "33", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Station Lane Burton Leonard ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HG3 3RX", "X-coordinate": "431299", "Y-coordinate": "464465", "Planning Authority": "Harrogate Borough Council", "Planning Application Reference": "22/00777/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.075167", "long": "-1.523157", "status": "planning", "mw": 33, "ext_id": "10893"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "27/09/2022", "to": "26/08/2023", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Station Lane, Burton Leonard - Battery Energy Storage System", "to": "Wormald Green - Battery Energy Storage System", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "26/08/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}], "current": {"Old Ref ID": "", "Ref ID": "10893", "Record Last Updated (dd/mm/yyyy)": "26/08/2023", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Wormald Green - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "33", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Station Lane Burton Leonard ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HG3 3RX", "X-coordinate": "431299", "Y-coordinate": "464465", "Planning Authority": "Harrogate Borough Council", "Planning Application Reference": "22/00777/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "26/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2025", "Under Construction": "26/08/2023", "Operational": "", "Heat Network Ref": "", "lat": "54.075167", "long": "-1.523157", "status": "construction", "mw": 33, "ext_id": "10893"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-27", "start_construction": "2023-08-26", "start_operation": ""}, "month_disappeared": ""}, "mw": 33, "mwh_is_estimate": true, "mwh": 33, "mwh_estimate": 33, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-09-26", "start_construction": "2023-08-26", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wormald Green - Battery Energy Storage System", "name_short": "Wormald Green - Battery", "owner": "Harmony Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "54.075167", "long": "-1.523157", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.075167+-1.523157", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Law Of Doune Road, Macduff - Battery Storage", "city": "", "id": "1094", "external_id": "10894", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1094", "external_id": "10894", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Law Of Doune Road, Macduff - Battery Storage", "external_id": "10894", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Intelligent Land Investments Group Plc", "status": "planning", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.66067", "long": "-2.501136", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10894", "Record Last Updated (dd/mm/yyyy)": "16/02/2023", "Operator (or Applicant)": "Intelligent Land Investments Group Plc", "Site Name": "Law Of Doune Road, Macduff - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Macduff Electricity Substation Law Of Doune Road Macduff ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB45 3QL", "X-coordinate": "370197", "Y-coordinate": "863530", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0130", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.66067", "long": "-2.501136", "status": "planning", "mw": 49, "ext_id": "10894"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "16/02/2023", "to": "07/12/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10894", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Intelligent Land Investments Group Plc", "Site Name": "Law Of Doune Road, Macduff - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Macduff Electricity Substation Law Of Doune Road Macduff ", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB45 3QL", "X-coordinate": "370197", "Y-coordinate": "863530", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0130", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.66067", "long": "-2.501136", "status": "planning", "mw": 49, "ext_id": "10894"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Law Of Doune Road, Macduff - Battery Storage", "name_short": "Law Of Doune Road, Macduff", "owner": "Intelligent Land Investments Group Plc", "state": "scotland", "country": "uk", "lat": "57.66067", "long": "-2.501136", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.66067+-2.501136", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hawthorn Grid Site - Battery Storage", "city": "", "id": "1095", "external_id": "10896", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1095", "external_id": "10896", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hawthorn Grid Site - Battery Storage", "external_id": "10896", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2022-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.801397", "long": "-1.394172", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10896", "Record Last Updated (dd/mm/yyyy)": "05/12/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Hawthorn Grid Site - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawthorn Grid Site Murton", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 2RX", "X-coordinate": "439044", "Y-coordinate": "545337", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/00747/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.801397", "long": "-1.394172", "status": "planning", "mw": 49, "ext_id": "10896"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/12/2022", "to": "30/03/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10896", "Record Last Updated (dd/mm/yyyy)": "30/03/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Hawthorn Grid Site - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hawthorn Grid Site Murton", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 2RX", "X-coordinate": "439044", "Y-coordinate": "545337", "Planning Authority": "Durham County Council", "Planning Application Reference": "DM/22/00747/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/03/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "02/12/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "02/12/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.801397", "long": "-1.394172", "status": "planning", "mw": 49, "ext_id": "10896"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2022-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hawthorn Grid Site - Battery Storage", "name_short": "Hawthorn Grid Site", "owner": "Harmony Energy Limited", "state": "north east", "country": "uk", "lat": "54.801397", "long": "-1.394172", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.801397+-1.394172", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Burton Solar Project", "city": "", "id": "1096", "external_id": "10917", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Island Green Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1096", "external_id": "10917", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Burton Solar Project", "external_id": "10917", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Island Green Power", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.292622", "long": "-0.677455", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10917", "Record Last Updated (dd/mm/yyyy)": "11/04/2023", "Operator (or Applicant)": "Island Green Power", "Site Name": "West Burton Solar Project", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10916", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O River Trent, S/O the A1500 & N/O Saxilby, West Lindsey, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN21", "X-coordinate": "488253", "Y-coordinate": "378111", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010132", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.292622", "long": "-0.677455", "status": "planning", "mw": 20, "ext_id": "10917"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "11/04/2023", "to": "01/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10917", "Record Last Updated (dd/mm/yyyy)": "01/04/2022", "Operator (or Applicant)": "Island Green Power", "Site Name": "West Burton Solar Project", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10916", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O River Trent, S/O the A1500 & N/O Saxilby, West Lindsey, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN21", "X-coordinate": "488253", "Y-coordinate": "378111", "Planning Authority": "The Planning Inspectorate - National Infrastructure", "Planning Application Reference": "EN010132", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.292622", "long": "-0.677455", "status": "planning", "mw": 20, "ext_id": "10917"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Burton Solar Project", "name_short": "West Burton Solar", "owner": "Island Green Power", "state": "east midlands", "country": "uk", "lat": "53.292622", "long": "-0.677455", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.292622+-0.677455", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coalburn II Energy - Battery Storage", "city": "", "id": "1097", "external_id": "11034", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1097", "external_id": "11034", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coalburn II Energy - Battery Storage", "external_id": "11034", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Alcemi Storage Development Limited", "status": "planning", "date_first_heard": "2023-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.610593", "long": "-3.848623", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11034", "Record Last Updated (dd/mm/yyyy)": "10/07/2023", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Coalburn II Energy - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "700m N/O Birkhill Mill, Cairnhouses Road, Lanark", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11", "X-coordinate": "283651", "Y-coordinate": "636772", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003458", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.610593", "long": "-3.848623", "status": "planning", "mw": 500, "ext_id": "11034"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "10/07/2023", "to": "20/04/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11034", "Record Last Updated (dd/mm/yyyy)": "20/04/2022", "Operator (or Applicant)": "Alcemi Storage Development Limited", "Site Name": "Coalburn II Energy - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "700m N/O Birkhill Mill, Cairnhouses Road, Lanark", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11", "X-coordinate": "283651", "Y-coordinate": "636772", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003458", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/06/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.610593", "long": "-3.848623", "status": "planning", "mw": 500, "ext_id": "11034"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coalburn II Energy - Battery Storage", "name_short": "Coalburn II Energy", "owner": "Alcemi Storage Development Limited", "state": "scotland", "country": "uk", "lat": "55.610593", "long": "-3.848623", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.610593+-3.848623", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Well Street - Battery Storage", "city": "", "id": "1098", "external_id": "11473", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Larkfleet Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1098", "external_id": "11473", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Well Street - Battery Storage", "external_id": "11473", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Larkfleet Group", "status": "planning", "date_first_heard": "2023-05-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.846443", "long": "-4.435761", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11473", "Record Last Updated (dd/mm/yyyy)": "22/06/2023", "Operator (or Applicant)": "Larkfleet Group", "Site Name": "Well Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Gasholder Station At Junction With Underwood Road Well Street ", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA1 2SL", "X-coordinate": "247596", "Y-coordinate": "664154", "Planning Authority": "Renfrewshire Council", "Planning Application Reference": "23/0018/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/05/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.846443", "long": "-4.435761", "status": "planning", "mw": 49, "ext_id": "11473"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "22/06/2023", "to": "31/03/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11473", "Record Last Updated (dd/mm/yyyy)": "31/03/2023", "Operator (or Applicant)": "Larkfleet Group", "Site Name": "Well Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Former Gasholder Station At Junction With Underwood Road Well Street ", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA1 2SL", "X-coordinate": "247596", "Y-coordinate": "664154", "Planning Authority": "Renfrewshire Council", "Planning Application Reference": "23/0018/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/05/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.846443", "long": "-4.435761", "status": "planning", "mw": 49, "ext_id": "11473"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-05-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Well Street - Battery Storage", "name_short": "Well Street", "owner": "Larkfleet Group", "state": "scotland", "country": "uk", "lat": "55.846443", "long": "-4.435761", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.846443+-4.435761", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kellwood Road - Battery Storage", "city": "", "id": "1099", "external_id": "11545", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Geocore Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1099", "external_id": "11545", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kellwood Road - Battery Storage", "external_id": "11545", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Geocore Limited", "status": "planning", "date_first_heard": "2023-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.068487", "long": "-3.589623", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11545", "Record Last Updated (dd/mm/yyyy)": "17/04/2023", "Operator (or Applicant)": "Geocore Limited", "Site Name": "Kellwood Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kellwood Road ", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG1 2JR", "X-coordinate": "298587", "Y-coordinate": "576046", "Planning Authority": "Dumfries & Galloway Council", "Planning Application Reference": "23/0513/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.068487", "long": "-3.589623", "status": "planning", "mw": 49, "ext_id": "11545"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "17/04/2023", "to": "24/06/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11545", "Record Last Updated (dd/mm/yyyy)": "24/06/2022", "Operator (or Applicant)": "Geocore Limited", "Site Name": "Kellwood Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kellwood Road ", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG1 2JR", "X-coordinate": "298587", "Y-coordinate": "576046", "Planning Authority": "Dumfries & Galloway Council", "Planning Application Reference": "23/0513/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.068487", "long": "-3.589623", "status": "planning", "mw": 49, "ext_id": "11545"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kellwood Road - Battery Storage", "name_short": "Kellwood Road", "owner": "Geocore Limited", "state": "scotland", "country": "uk", "lat": "55.068487", "long": "-3.589623", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.068487+-3.589623", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holmston Road - Battery Storage Facility", "city": "", "id": "1100", "external_id": "11679", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy Systems Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1100", "external_id": "11679", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holmston Road - Battery Storage Facility", "external_id": "11679", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Renewable Energy Systems Limited", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.455039", "long": "-4.588387", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11679", "Record Last Updated (dd/mm/yyyy)": "06/07/2023", "Operator (or Applicant)": "Renewable Energy Systems Limited", "Site Name": "Holmston Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holmston Farm Holmston Road Ayr ", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 5JJ", "X-coordinate": "236417", "Y-coordinate": "620956", "Planning Authority": "South Ayrshire Council", "Planning Application Reference": "23/00176/APPM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/06/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.455039", "long": "-4.588387", "status": "planning", "mw": 49, "ext_id": "11679"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/07/2023", "to": "18/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "23/00176/APPM", "to": "22/00505/PAN", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "30/06/2023", "to": "30/06/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11679", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Renewable Energy Systems Limited", "Site Name": "Holmston Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holmston Farm Holmston Road Ayr ", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 5JJ", "X-coordinate": "236417", "Y-coordinate": "620956", "Planning Authority": "South Ayrshire Council", "Planning Application Reference": "22/00505/PAN", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "30/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "30/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.455039", "long": "-4.588387", "status": "planning", "mw": 49, "ext_id": "11679"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holmston Road - Battery Storage Facility", "name_short": "Holmston Road", "owner": "Renewable Energy Systems Limited", "state": "scotland", "country": "uk", "lat": "55.455039", "long": "-4.588387", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.455039+-4.588387", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "city": "", "id": "1101", "external_id": "11680", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "240", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1101", "external_id": "11680", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "external_id": "11680", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 240, "power_mw": 240, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.700073", "long": "-1.129543", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11680", "Record Last Updated (dd/mm/yyyy)": "05/04/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "240", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Springfield Farm Weeland Road Hensall Selby Goole ", "County": "North Yorkshire ", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0RL ", "X-coordinate": "457566", "Y-coordinate": "422978", "Planning Authority": "Selby District Council", "Planning Application Reference": "2023/0285/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.700073", "long": "-1.129543", "status": "planning", "mw": 240, "ext_id": "11680"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "05/04/2023", "to": "18/07/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "2023/0285/FULM", "to": "2022/0813/SCN", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11680", "Record Last Updated (dd/mm/yyyy)": "18/07/2022", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "240", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Springfield Farm Weeland Road Hensall Selby Goole ", "County": "North Yorkshire ", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0RL ", "X-coordinate": "457566", "Y-coordinate": "422978", "Planning Authority": "Selby District Council", "Planning Application Reference": "2022/0813/SCN", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.700073", "long": "-1.129543", "status": "planning", "mw": 240, "ext_id": "11680"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 240, "mwh_is_estimate": true, "mwh": 240, "mwh_estimate": 240, "status": "planning", "status_class": "", "date_first_heard": "2023-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "name_short": "Springfield Farm, Hensall - Battery...", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.700073", "long": "-1.129543", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.700073+-1.129543", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Haughend Farm - Alyth Battery Energy Storage System", "city": "", "id": "1102", "external_id": "11858", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "450", "power_mw": "450", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1102", "external_id": "11858", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Haughend Farm - Alyth Battery Energy Storage System", "external_id": "11858", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 450, "power_mw": 450, "owner": "EcoDev Group Limited", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.6107", "long": "-3.156364", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11858", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Haughend Farm - Alyth Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "450", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Haughend Farm, Meigle, Blairgowrie", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH12 8RJ", "X-coordinate": "329120", "Y-coordinate": "747134", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004631", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.6107", "long": "-3.156364", "status": "planning", "mw": 450, "ext_id": "11858"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11858", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "EcoDev Group Limited", "Site Name": "Haughend Farm - Alyth Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "450", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Haughend Farm, Meigle, Blairgowrie", "County": "Perthshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH12 8RJ", "X-coordinate": "329120", "Y-coordinate": "747134", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004631", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.6107", "long": "-3.156364", "status": "planning", "mw": 450, "ext_id": "11858"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 450, "mwh_is_estimate": true, "mwh": 450, "mwh_estimate": 450, "status": "planning", "status_class": "", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Haughend Farm - Alyth Battery Energy Storage System", "name_short": "Haughend Farm - Alyth Battery", "owner": "EcoDev Group Limited", "state": "scotland", "country": "uk", "lat": "56.6107", "long": "-3.156364", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.6107+-3.156364", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eccles Battery Energy Storage System", "city": "", "id": "1103", "external_id": "11867", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Weaver Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1103", "external_id": "11867", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Eccles Battery Energy Storage System", "external_id": "11867", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": " Zenobe Energy Limited", "status": "planning", "date_first_heard": "2023-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.663528", "long": "-2.330063", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11867", "Record Last Updated (dd/mm/yyyy)": "29/09/2022", "Operator (or Applicant)": "Weaver Power Limited", "Site Name": "Eccles Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, Coldstream", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 ", "X-coordinate": "379334", "Y-coordinate": "641162", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004601", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.663528", "long": "-2.330063", "status": "planning", "mw": 400, "ext_id": "11867"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/09/2022", "to": "12/09/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Weaver Power Limited", "to": " Zenobe Energy Limited", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/08/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11867", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": " Zenobe Energy Limited", "Site Name": "Eccles Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, Coldstream", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 ", "X-coordinate": "379334", "Y-coordinate": "641162", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004601", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/08/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.663528", "long": "-2.330063", "status": "planning", "mw": 400, "ext_id": "11867"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-08-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Eccles Battery Energy Storage System", "name_short": "Eccles Battery", "owner": " Zenobe Energy Limited", "state": "scotland", "country": "uk", "lat": "55.663528", "long": "-2.330063", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.663528+-2.330063", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middleton Road - Linwood Battery Energy Storage System", "city": "", "id": "1104", "external_id": "11868", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "69", "power_mw": "69", "customer": "", "owner": "Bluestone Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1104", "external_id": "11868", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Middleton Road - Linwood Battery Energy Storage System", "external_id": "11868", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 69, "power_mw": 69, "owner": "Bluestone Energy Limited", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.852955", "long": "-4.487618", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11868", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "Bluestone Energy Limited", "Site Name": "Middleton Road - Linwood Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "69", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Road, Linwood, Paisley", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA3 3DP", "X-coordinate": "244376", "Y-coordinate": "664994", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004543", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.852955", "long": "-4.487618", "status": "planning", "mw": 69, "ext_id": "11868"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11868", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "Bluestone Energy Limited", "Site Name": "Middleton Road - Linwood Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "69", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Road, Linwood, Paisley", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA3 3DP", "X-coordinate": "244376", "Y-coordinate": "664994", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004543", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.852955", "long": "-4.487618", "status": "planning", "mw": 69, "ext_id": "11868"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 69, "mwh_is_estimate": true, "mwh": 69, "mwh_estimate": 69, "status": "planning", "status_class": "", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Middleton Road - Linwood Battery Energy Storage System", "name_short": "Middleton Road - Linwood Battery", "owner": "Bluestone Energy Limited", "state": "scotland", "country": "uk", "lat": "55.852955", "long": "-4.487618", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.852955+-4.487618", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Burton Power Station, North Road - Battery Storage", "city": "", "id": "1105", "external_id": "11928", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "West Burton Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1105", "external_id": "11928", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Burton Power Station, North Road - Battery Storage", "external_id": "11928", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "West Burton Energy Limited", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.36535", "long": "-0.819403", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11928", "Record Last Updated (dd/mm/yyyy)": "25/01/2023", "Operator (or Applicant)": "West Burton Energy Limited", "Site Name": "West Burton Power Station, North Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Burton Power Station North Road West Burton", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 9BL", "X-coordinate": "478658", "Y-coordinate": "386036", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "22/01713/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.36535", "long": "-0.819403", "status": "planning", "mw": 500, "ext_id": "11928"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11928", "Record Last Updated (dd/mm/yyyy)": "25/01/2023", "Operator (or Applicant)": "West Burton Energy Limited", "Site Name": "West Burton Power Station, North Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Burton Power Station North Road West Burton", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN22 9BL", "X-coordinate": "478658", "Y-coordinate": "386036", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "22/01713/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.36535", "long": "-0.819403", "status": "planning", "mw": 500, "ext_id": "11928"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Burton Power Station, North Road - Battery Storage", "name_short": "West Burton Power Station, North Ro...", "owner": "West Burton Energy Limited", "state": "east midlands", "country": "uk", "lat": "53.36535", "long": "-0.819403", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.36535+-0.819403", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Normanton Energy Reserve - Battery Storage", "city": "", "id": "1106", "external_id": "11988", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Exagen SPVO2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1106", "external_id": "11988", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Normanton Energy Reserve - Battery Storage", "external_id": "11988", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Exagen SPVO2 Limited", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.58755", "long": "-1.269665", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11988", "Record Last Updated (dd/mm/yyyy)": "18/01/2023", "Operator (or Applicant)": "Exagen SPVO2 Limited", "Site Name": "Normanton Energy Reserve - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "NW/O Earl Shilton Road Thurlaston ", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE9 7TG", "X-coordinate": "449577", "Y-coordinate": "299111", "Planning Authority": "Blaby District Council", "Planning Application Reference": "22/1204/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.58755", "long": "-1.269665", "status": "planning", "mw": 500, "ext_id": "11988"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11988", "Record Last Updated (dd/mm/yyyy)": "18/01/2023", "Operator (or Applicant)": "Exagen SPVO2 Limited", "Site Name": "Normanton Energy Reserve - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "NW/O Earl Shilton Road Thurlaston ", "County": "Leicestershire", "Region": "East Midlands", "Country": "England", "Post Code": "LE9 7TG", "X-coordinate": "449577", "Y-coordinate": "299111", "Planning Authority": "Blaby District Council", "Planning Application Reference": "22/1204/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.58755", "long": "-1.269665", "status": "planning", "mw": 500, "ext_id": "11988"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Normanton Energy Reserve - Battery Storage", "name_short": "Normanton Energy Reserve", "owner": "Exagen SPVO2 Limited", "state": "east midlands", "country": "uk", "lat": "52.58755", "long": "-1.269665", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.58755+-1.269665", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Highfield Energy Park", "city": "", "id": "1107", "external_id": "12312", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1107", "external_id": "12312", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Highfield Energy Park", "external_id": "12312", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Exagen", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.897962", "long": "-1.902172", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12312", "Record Last Updated (dd/mm/yyyy)": "09/06/2023", "Operator (or Applicant)": "Exagen", "Site Name": "Highfield Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12311", "Installed Capacity (MWelec)": "12.5", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South West Of Whittonstall", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH8 9LQ", "X-coordinate": "406372", "Y-coordinate": "555919", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "23/01717/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.897962", "long": "-1.902172", "status": "planning", "mw": 12, "ext_id": "12312"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12312", "Record Last Updated (dd/mm/yyyy)": "09/06/2023", "Operator (or Applicant)": "Exagen", "Site Name": "Highfield Energy Park", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12311", "Installed Capacity (MWelec)": "12.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South West Of Whittonstall", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH8 9LQ", "X-coordinate": "406372", "Y-coordinate": "555919", "Planning Authority": "Northumberland County Council", "Planning Application Reference": "23/01717/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.897962", "long": "-1.902172", "status": "planning", "mw": 12, "ext_id": "12312"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Highfield Energy Park", "name_short": "Highfield Energy Park", "owner": "Exagen", "state": "north east", "country": "uk", "lat": "54.897962", "long": "-1.902172", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.897962+-1.902172", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "city": "", "id": "1108", "external_id": "12361", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1108", "external_id": "12361", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "external_id": "12361", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "One Planet Developments Limited", "status": "planning", "date_first_heard": "2023-09-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.636363", "long": "-2.265832", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12361", "Record Last Updated (dd/mm/yyyy)": "01/02/2023", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Meetlaw Farm Fordoun Laurencekirk ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB30 1LL ", "X-coordinate": "381297", "Y-coordinate": "81886", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2676", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.636363", "long": "-2.265832", "status": "planning", "mw": 49, "ext_id": "12361"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "01/02/2023", "to": "04/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "19/09/2029", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12361", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "One Planet Developments Limited", "Site Name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Meetlaw Farm Fordoun Laurencekirk ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB30 1LL ", "X-coordinate": "381297", "Y-coordinate": "81886", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2022/2676", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "19/09/2029", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.636363", "long": "-2.265832", "status": "planning", "mw": 49, "ext_id": "12361"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "name_short": "Meetlaw Farm, Fordoun - Battery", "owner": "One Planet Developments Limited", "state": "scotland", "country": "uk", "lat": "50.636363", "long": "-2.265832", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.636363+-2.265832", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Libra Energy Stability Project - Battery Energy Storage", "city": "", "id": "1109", "external_id": "12443", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Lightrock Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1109", "external_id": "12443", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Libra Energy Stability Project - Battery Energy Storage", "external_id": "12443", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Lightrock Power", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.973245", "long": "-0.224354", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12443", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Lightrock Power", "Site Name": "Libra Energy Stability Project - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coombe Farm, Bob Lane, Twineham, Haywards Heath", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "RH17 5NH", "X-coordinate": "524764", "Y-coordinate": "120815", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/23/1184", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.973245", "long": "-0.224354", "status": "planning", "mw": 100, "ext_id": "12443"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12443", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Lightrock Power", "Site Name": "Libra Energy Stability Project - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coombe Farm, Bob Lane, Twineham, Haywards Heath", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "RH17 5NH", "X-coordinate": "524764", "Y-coordinate": "120815", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/23/1184", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.973245", "long": "-0.224354", "status": "planning", "mw": 100, "ext_id": "12443"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Libra Energy Stability Project - Battery Energy Storage", "name_short": "Libra Energy Stability Project", "owner": "Lightrock Power", "state": "south east", "country": "uk", "lat": "50.973245", "long": "-0.224354", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.973245+-0.224354", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thorpe Marsh Power Station - Battery Energy Storage", "city": "", "id": "1110", "external_id": "12453", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1450", "power_mw": "1450", "customer": "", "owner": "Banks Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1110", "external_id": "12453", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Thorpe Marsh Power Station - Battery Energy Storage", "external_id": "12453", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 1450, "power_mw": 1450, "owner": "West Burton Energy", "status": "planning", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.580257", "long": "-1.085062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12453", "Record Last Updated (dd/mm/yyyy)": "06/02/2023", "Operator (or Applicant)": "Banks Renewables Limited", "Site Name": "Thorpe Marsh Power Station - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1450", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thorpe Marsh Power Station Marsh Lane Barnby Dun Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN3 1ET", "X-coordinate": "460674", "Y-coordinate": "409685", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/00022/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.580257", "long": "-1.085062", "status": "planning", "mw": 1450, "ext_id": "12453"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/02/2023", "to": "12/10/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Banks Renewables Limited", "to": "West Burton Energy", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12453", "Record Last Updated (dd/mm/yyyy)": "12/10/2023", "Operator (or Applicant)": "West Burton Energy", "Site Name": "Thorpe Marsh Power Station - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1450", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thorpe Marsh Power Station Marsh Lane Barnby Dun Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN3 1ET", "X-coordinate": "460674", "Y-coordinate": "409685", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/00022/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.580257", "long": "-1.085062", "status": "planning", "mw": 1450, "ext_id": "12453"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1450, "mwh_is_estimate": true, "mwh": 1450, "mwh_estimate": 1450, "status": "planning", "status_class": "", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Thorpe Marsh Power Station - Battery Energy Storage", "name_short": "Thorpe Marsh Power Station", "owner": "West Burton Energy", "state": "yorkshire and humber", "country": "uk", "lat": "53.580257", "long": "-1.085062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.580257+-1.085062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackdyke Farm, Blackford - Battery Storage", "city": "", "id": "1111", "external_id": "12710", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1111", "external_id": "12710", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackdyke Farm, Blackford - Battery Storage", "external_id": "12710", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 340, "power_mw": 340, "owner": "Novus Renewable Services Limited / Story Construction", "status": "planning", "date_first_heard": "2023-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.953508", "long": "-2.968236", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12710", "Record Last Updated (dd/mm/yyyy)": "12/07/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Blackdyke Farm, Blackford - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of Blackdyke Farm, Blackford", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4EY", "X-coordinate": "338089", "Y-coordinate": "562525", "Planning Authority": "Carlisle Council", "Planning Application Reference": "23/0444", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.953508", "long": "-2.968236", "status": "planning", "mw": 400, "ext_id": "12710"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/07/2023", "to": "10/10/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Novus Renewable Services Limited", "to": "Novus Renewable Services Limited / Story Construction", "extra": "", "change_type": "misc"}, {"name": "Installed Capacity (MWelec)", "from": "400", "to": "340", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Carlisle Council", "to": "Carlisle City Council", "extra": "", "change_type": "misc"}, {"name": "Planning Application Reference", "from": "23/0444", "to": "23/0659", "extra": "", "change_type": "misc"}, {"name": "Planning Application Submitted", "from": "21/06/2023", "to": "22/09/2023", "extra": "", "change_type": "misc"}, {"name": "mw", "from": 400, "to": 340, "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12710", "Record Last Updated (dd/mm/yyyy)": "10/10/2023", "Operator (or Applicant)": "Novus Renewable Services Limited / Story Construction", "Site Name": "Blackdyke Farm, Blackford - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "340", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of Blackdyke Farm, Blackford", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4EY", "X-coordinate": "338089", "Y-coordinate": "562525", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0659", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.953508", "long": "-2.968236", "status": "planning", "mw": 340, "ext_id": "12710"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 340, "mwh_is_estimate": true, "mwh": 340, "mwh_estimate": 340, "status": "planning", "status_class": "", "date_first_heard": "2023-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackdyke Farm, Blackford - Battery Storage", "name_short": "Blackdyke Farm, Blackford", "owner": "Novus Renewable Services Limited / Story Construction", "state": "north west", "country": "uk", "lat": "54.953508", "long": "-2.968236", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.953508+-2.968236", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "A981 Fraserburgh - Battery Energy Storage", "city": "", "id": "1112", "external_id": "12711", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Fraserburgh Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1112", "external_id": "12711", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "A981 Fraserburgh - Battery Energy Storage", "external_id": "12711", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Fraserburgh Energy Limited", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.607237", "long": "-2.109915", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12711", "Record Last Updated (dd/mm/yyyy)": "18/04/2023", "Operator (or Applicant)": "Fraserburgh Energy Limited", "Site Name": "A981 Fraserburgh - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of A981 ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 6SN", "X-coordinate": "393531", "Y-coordinate": "857476", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0193", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/04/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.607237", "long": "-2.109915", "status": "planning", "mw": 45, "ext_id": "12711"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "18/04/2023", "to": "03/07/2023", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12711", "Record Last Updated (dd/mm/yyyy)": "03/07/2023", "Operator (or Applicant)": "Fraserburgh Energy Limited", "Site Name": "A981 Fraserburgh - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Of A981 ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB43 6SN", "X-coordinate": "393531", "Y-coordinate": "857476", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0193", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/04/2023", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.607237", "long": "-2.109915", "status": "planning", "mw": 45, "ext_id": "12711"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "A981 Fraserburgh - Battery Energy Storage", "name_short": "A981 Fraserburgh", "owner": "Fraserburgh Energy Limited", "state": "scotland", "country": "uk", "lat": "57.607237", "long": "-2.109915", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.607237+-2.109915", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "city": "", "id": "1113", "external_id": "12760", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1113", "external_id": "12760", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "external_id": "12760", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Renewable Energy Systems (RES)", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.117304", "long": "-3.068369", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12760", "Record Last Updated (dd/mm/yyyy)": "07/12/2022", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10999", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Solwaybank, Allfornought Hill, Langholm", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG13", "X-coordinate": "331955", "Y-coordinate": "580845", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003463", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.117304", "long": "-3.068369", "status": "planning", "mw": 45, "ext_id": "12760"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12760", "Record Last Updated (dd/mm/yyyy)": "07/12/2022", "Operator (or Applicant)": "Renewable Energy Systems (RES)", "Site Name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10999", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Solwaybank, Allfornought Hill, Langholm", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG13", "X-coordinate": "331955", "Y-coordinate": "580845", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003463", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.117304", "long": "-3.068369", "status": "planning", "mw": 45, "ext_id": "12760"}, "current_month": "2024-01", "dates": {"first_heard": "2022-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "name_short": "Bloch Wind Farm & Battery Storage (...", "owner": "Renewable Energy Systems (RES)", "state": "scotland", "country": "uk", "lat": "55.117304", "long": "-3.068369", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.117304+-3.068369", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "city": "", "id": "1114", "external_id": "12820", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Noriker Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1114", "external_id": "12820", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "external_id": "12820", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 350, "power_mw": 350, "owner": "Noriker Power Limited", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.555129", "long": "-4.447525", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12820", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "Noriker Power Limited", "Site Name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "350", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Camsiscan Farm, Craigie, Kilmarnock South, Kilmarnock", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JT", "X-coordinate": "245715", "Y-coordinate": "631769", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "ECU00004658", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.555129", "long": "-4.447525", "status": "planning", "mw": 350, "ext_id": "12820"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12820", "Record Last Updated (dd/mm/yyyy)": "09/02/2023", "Operator (or Applicant)": "Noriker Power Limited", "Site Name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "350", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Camsiscan Farm, Craigie, Kilmarnock South, Kilmarnock", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JT", "X-coordinate": "245715", "Y-coordinate": "631769", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "ECU00004658", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.555129", "long": "-4.447525", "status": "planning", "mw": 350, "ext_id": "12820"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 350, "mwh_is_estimate": true, "mwh": 350, "mwh_estimate": 350, "status": "planning", "status_class": "", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "name_short": "Camsiscan Farm, Craigie - Battery", "owner": "Noriker Power Limited", "state": "scotland", "country": "uk", "lat": "55.555129", "long": "-4.447525", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.555129+-4.447525", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Staythorpe Road, Averham - Battery Storage", "city": "", "id": "1115", "external_id": "12893", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "SSE Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1115", "external_id": "12893", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Staythorpe Road, Averham - Battery Storage", "external_id": "12893", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 300, "power_mw": 300, "owner": "SSE Battery Storage Limited", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.081313", "long": "-0.862764", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12893", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "SSE Battery Storage Limited", "Site Name": "Staythorpe Road, Averham - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Staythorpe Road Averham", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG23 5RA", "X-coordinate": "476275", "Y-coordinate": "354392", "Planning Authority": "Newark Council", "Planning Application Reference": "23/00317/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.081313", "long": "-0.862764", "status": "planning", "mw": 300, "ext_id": "12893"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12893", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "SSE Battery Storage Limited", "Site Name": "Staythorpe Road, Averham - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Staythorpe Road Averham", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG23 5RA", "X-coordinate": "476275", "Y-coordinate": "354392", "Planning Authority": "Newark Council", "Planning Application Reference": "23/00317/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.081313", "long": "-0.862764", "status": "planning", "mw": 300, "ext_id": "12893"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 300, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Staythorpe Road, Averham - Battery Storage", "name_short": "Staythorpe Road, Averham", "owner": "SSE Battery Storage Limited", "state": "east midlands", "country": "uk", "lat": "53.081313", "long": "-0.862764", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.081313+-0.862764", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coldharbour, Chickerell - Battery Storage Facility", "city": "", "id": "1116", "external_id": "12967", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "23 Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1116", "external_id": "12967", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coldharbour, Chickerell - Battery Storage Facility", "external_id": "12967", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "23 Energy", "status": "planning", "date_first_heard": "2023-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.631479", "long": "-2.492596", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12967", "Record Last Updated (dd/mm/yyyy)": "19/06/2023", "Operator (or Applicant)": "23 Energy", "Site Name": "Coldharbour, Chickerell - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Coldharbour, Chickerell, Weymouth", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT3 4BG", "X-coordinate": "365257", "Y-coordinate": "81425", "Planning Authority": "Weymouth & Portland Borough Council", "Planning Application Reference": "P/FUL/2023/02446", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.631479", "long": "-2.492596", "status": "planning", "mw": 60, "ext_id": "12967"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12967", "Record Last Updated (dd/mm/yyyy)": "19/06/2023", "Operator (or Applicant)": "23 Energy", "Site Name": "Coldharbour, Chickerell - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Coldharbour, Chickerell, Weymouth", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT3 4BG", "X-coordinate": "365257", "Y-coordinate": "81425", "Planning Authority": "Weymouth & Portland Borough Council", "Planning Application Reference": "P/FUL/2023/02446", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.631479", "long": "-2.492596", "status": "planning", "mw": 60, "ext_id": "12967"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coldharbour, Chickerell - Battery Storage Facility", "name_short": "Coldharbour, Chickerell", "owner": "23 Energy", "state": "south west", "country": "uk", "lat": "50.631479", "long": "-2.492596", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.631479+-2.492596", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Drumore Cottage, Swordale - Battery Storage", "city": "", "id": "1117", "external_id": "12983", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Fig Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1117", "external_id": "12983", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Drumore Cottage, Swordale - Battery Storage", "external_id": "12983", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Fig Power", "status": "planning", "date_first_heard": "2023-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.658593", "long": "-4.389942", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12983", "Record Last Updated (dd/mm/yyyy)": "07/07/2023", "Operator (or Applicant)": "Fig Power", "Site Name": "Drumore Cottage, Swordale - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Drumore Farm, Swordale, Evanton", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV16 9XA", "X-coordinate": "257503", "Y-coordinate": "865702", "Planning Authority": "Highlands Council", "Planning Application Reference": "23/02840/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.658593", "long": "-4.389942", "status": "planning", "mw": 49, "ext_id": "12983"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "12983", "Record Last Updated (dd/mm/yyyy)": "07/07/2023", "Operator (or Applicant)": "Fig Power", "Site Name": "Drumore Cottage, Swordale - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Drumore Farm, Swordale, Evanton", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV16 9XA", "X-coordinate": "257503", "Y-coordinate": "865702", "Planning Authority": "Highland Council", "Planning Application Reference": "23/02840/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.658593", "long": "-4.389942", "status": "planning", "mw": 49, "ext_id": "12983"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Drumore Cottage, Swordale - Battery Storage", "name_short": "Drumore Cottage, Swordale", "owner": "Fig Power", "state": "scotland", "country": "uk", "lat": "57.658593", "long": "-4.389942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.658593+-4.389942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walpole Sub Station, Walpole Bank - Battery Storage", "city": "", "id": "1118", "external_id": "13045", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Henry Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1118", "external_id": "13045", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walpole Sub Station, Walpole Bank - Battery Storage", "external_id": "13045", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Henry Energy Limited", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.724985", "long": "0.205612", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13045", "Record Last Updated (dd/mm/yyyy)": "18/01/2023", "Operator (or Applicant)": "Henry Energy Limited", "Site Name": "Walpole Sub Station, Walpole Bank - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Walpole Sub Station Walpole Bank Walpole St Andrew ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549050", "Y-coordinate": "316430", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02265/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.724985", "long": "0.205612", "status": "planning", "mw": 100, "ext_id": "13045"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13045", "Record Last Updated (dd/mm/yyyy)": "18/01/2023", "Operator (or Applicant)": "Henry Energy Limited", "Site Name": "Walpole Sub Station, Walpole Bank - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Walpole Sub Station Walpole Bank Walpole St Andrew ", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549050", "Y-coordinate": "316430", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02265/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.724985", "long": "0.205612", "status": "planning", "mw": 100, "ext_id": "13045"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walpole Sub Station, Walpole Bank - Battery Storage", "name_short": "Walpole Sub Station, Walpole Bank", "owner": "Henry Energy Limited", "state": "eastern", "country": "uk", "lat": "52.724985", "long": "0.205612", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.724985+0.205612", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "city": "", "id": "1120", "external_id": "13087", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Scot Stability Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1120", "external_id": "13087", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "external_id": "13087", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Scot Stability Limited", "status": "planning", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.403505", "long": "-2.521716", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13087", "Record Last Updated (dd/mm/yyyy)": "25/05/2023", "Operator (or Applicant)": "Scot Stability Limited", "Site Name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Of Blackhills Rothienorman ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8YN ", "X-coordinate": "368749", "Y-coordinate": "834910", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0718", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.403505", "long": "-2.521716", "status": "planning", "mw": 49, "ext_id": "13087"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/05/2023", "to": "18/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13087", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "Scot Stability Limited", "Site Name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Middleton Of Blackhills Rothienorman ", "County": "Aberdeenshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 8YN ", "X-coordinate": "368749", "Y-coordinate": "834910", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0718", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.403505", "long": "-2.521716", "status": "planning", "mw": 49, "ext_id": "13087"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "name_short": "Middleton Of Blackhills, Rothienorm...", "owner": "Scot Stability Limited", "state": "scotland", "country": "uk", "lat": "57.403505", "long": "-2.521716", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.403505+-2.521716", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pershore Lane, Tibberton - Battery Energy Storage System", "city": "", "id": "1121", "external_id": "13096", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Sirius Renewable Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1121", "external_id": "13096", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pershore Lane, Tibberton - Battery Energy Storage System", "external_id": "13096", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 14, "power_mw": 14, "owner": "Sirius Renewable Energy", "status": "planning", "date_first_heard": "2023-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.216297", "long": "-2.153875", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13096", "Record Last Updated (dd/mm/yyyy)": "25/01/2023", "Operator (or Applicant)": "Sirius Renewable Energy", "Site Name": "Pershore Lane, Tibberton - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Pershore Lane, Tibberton, Worcester", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "WR4 0AA", "X-coordinate": "389584", "Y-coordinate": "257576", "Planning Authority": "Wychavon District Council", "Planning Application Reference": "W/22/02717/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.216297", "long": "-2.153875", "status": "planning", "mw": 14, "ext_id": "13096"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/01/2023", "to": "31/10/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "27/10/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13096", "Record Last Updated (dd/mm/yyyy)": "31/10/2023", "Operator (or Applicant)": "Sirius Renewable Energy", "Site Name": "Pershore Lane, Tibberton - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "14", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Pershore Lane, Tibberton, Worcester", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "WR4 0AA", "X-coordinate": "389584", "Y-coordinate": "257576", "Planning Authority": "Wychavon District Council", "Planning Application Reference": "W/22/02717/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "27/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "27/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.216297", "long": "-2.153875", "status": "planning", "mw": 14, "ext_id": "13096"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 14, "mwh_is_estimate": true, "mwh": 14, "mwh_estimate": 14, "status": "planning", "status_class": "", "date_first_heard": "2023-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Pershore Lane, Tibberton - Battery Energy Storage System", "name_short": "Pershore Lane, Tibberton - Battery", "owner": "Sirius Renewable Energy", "state": "west midlands", "country": "uk", "lat": "52.216297", "long": "-2.153875", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.216297+-2.153875", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordhouse Lane - Battery Energy Storage System", "city": "", "id": "1122", "external_id": "13108", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "FPC (Electric Land) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1122", "external_id": "13108", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordhouse Lane - Battery Energy Storage System", "external_id": "13108", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "FPC (Electric Land) Limited", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.424347", "long": "-1.915134", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13108", "Record Last Updated (dd/mm/yyyy)": "31/01/2023", "Operator (or Applicant)": "FPC (Electric Land) Limited", "Site Name": "Fordhouse Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "165 Fordhouse Lane, Stirchley, Birmingham ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": " B30 3AG ", "X-coordinate": "405868", "Y-coordinate": "280710", "Planning Authority": "Birmingham City Council", "Planning Application Reference": "2023/00142/PA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.424347", "long": "-1.915134", "status": "planning", "mw": 20, "ext_id": "13108"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2023", "to": "11/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "18/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13108", "Record Last Updated (dd/mm/yyyy)": "11/09/2023", "Operator (or Applicant)": "FPC (Electric Land) Limited", "Site Name": "Fordhouse Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "165 Fordhouse Lane, Stirchley, Birmingham ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": " B30 3AG ", "X-coordinate": "405868", "Y-coordinate": "280710", "Planning Authority": "Birmingham City Council", "Planning Application Reference": "2023/00142/PA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.424347", "long": "-1.915134", "status": "planning", "mw": 20, "ext_id": "13108"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordhouse Lane - Battery Energy Storage System", "name_short": "Fordhouse Lane - Battery", "owner": "FPC (Electric Land) Limited", "state": "west midlands", "country": "uk", "lat": "52.424347", "long": "-1.915134", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.424347+-1.915134", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newburgh Road, Abernethy - Energy Storage", "city": "", "id": "1123", "external_id": "13111", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "P & M Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1123", "external_id": "13111", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newburgh Road, Abernethy - Energy Storage", "external_id": "13111", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "P & M Energy Limited", "status": "planning", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.34083", "long": "-3.290693", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13111", "Record Last Updated (dd/mm/yyyy)": "04/04/2023", "Operator (or Applicant)": "P & M Energy Limited", "Site Name": "Newburgh Road, Abernethy - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "110 Metres Ne/O Abernethy Cemetery, Abernethy Cemetery, Newburgh Road, Abernethy, Perth", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH2", "X-coordinate": "320311", "Y-coordinate": "717245", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/02217/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.34083", "long": "-3.290693", "status": "planning", "mw": 15, "ext_id": "13111"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13111", "Record Last Updated (dd/mm/yyyy)": "04/04/2023", "Operator (or Applicant)": "P & M Energy Limited", "Site Name": "Newburgh Road, Abernethy - Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "110 Metres Ne/O Abernethy Cemetery, Abernethy Cemetery, Newburgh Road, Abernethy, Perth", "County": "Tayside", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH2", "X-coordinate": "320311", "Y-coordinate": "717245", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/02217/FLL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "29/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "29/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.34083", "long": "-3.290693", "status": "planning", "mw": 15, "ext_id": "13111"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newburgh Road, Abernethy - Energy Storage", "name_short": "Newburgh Road, Abernethy", "owner": "P & M Energy Limited", "state": "scotland", "country": "uk", "lat": "56.34083", "long": "-3.290693", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.34083+-3.290693", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clashindarroch Wind Farm Extension", "city": "", "id": "1124", "external_id": "13117", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Infinergy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1124", "external_id": "13117", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clashindarroch Wind Farm Extension", "external_id": "13117", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Infinergy", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.372003", "long": "-2.858895", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13117", "Record Last Updated (dd/mm/yyyy)": "31/01/2023", "Operator (or Applicant)": "Infinergy", "Site Name": "Clashindarroch Wind Farm Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8004", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cabrach Estate, approximately 8km south east of Dufftown, 9km south west of Huntly, and 7.5km north west of Rhynie", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB54 4QS", "X-coordinate": "348444", "Y-coordinate": "831609", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004695", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.372003", "long": "-2.858895", "status": "planning", "mw": 50, "ext_id": "13117"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13117", "Record Last Updated (dd/mm/yyyy)": "31/01/2023", "Operator (or Applicant)": "Infinergy", "Site Name": "Clashindarroch Wind Farm Extension", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8004", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Cabrach Estate, approximately 8km south east of Dufftown, 9km south west of Huntly, and 7.5km north west of Rhynie", "County": "Moray", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB54 4QS", "X-coordinate": "348444", "Y-coordinate": "831609", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004695", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.372003", "long": "-2.858895", "status": "planning", "mw": 50, "ext_id": "13117"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clashindarroch Wind Farm Extension", "name_short": "Clashindarroch Wind Farm Extension", "owner": "Infinergy", "state": "scotland", "country": "uk", "lat": "57.372003", "long": "-2.858895", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.372003+-2.858895", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hollins Lane - Battery Energy Storage", "city": "", "id": "1125", "external_id": "13144", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1125", "external_id": "13144", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hollins Lane - Battery Energy Storage", "external_id": "13144", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "Hydrock Consultants Limited", "status": "planning", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.880797", "long": "-2.462967", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13144", "Record Last Updated (dd/mm/yyyy)": "22/05/2023", "Operator (or Applicant)": "Hydrock Consultants Limited", "Site Name": "Hollins Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Hollins Lane, Market Drayton", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "TF9 2AL", "X-coordinate": "368941", "Y-coordinate": "331582", "Planning Authority": "Shropshire City Council", "Planning Application Reference": "23/00223/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.880797", "long": "-2.462967", "status": "planning", "mw": 13, "ext_id": "13144"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13144", "Record Last Updated (dd/mm/yyyy)": "22/05/2023", "Operator (or Applicant)": "Hydrock Consultants Limited", "Site Name": "Hollins Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Hollins Lane, Market Drayton", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "TF9 2AL", "X-coordinate": "368941", "Y-coordinate": "331582", "Planning Authority": "Shropshire City Council", "Planning Application Reference": "23/00223/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.880797", "long": "-2.462967", "status": "planning", "mw": 13, "ext_id": "13144"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "planning", "status_class": "", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hollins Lane - Battery Energy Storage", "name_short": "Hollins Lane", "owner": "Hydrock Consultants Limited", "state": "west midlands", "country": "uk", "lat": "52.880797", "long": "-2.462967", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.880797+-2.462967", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Linton Court Farm, Highnam - Battery storage", "city": "", "id": "1126", "external_id": "13145", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "STOR 136 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1126", "external_id": "13145", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Linton Court Farm, Highnam - Battery storage", "external_id": "13145", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "STOR 136 Limited", "status": "planning", "date_first_heard": "2023-08-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.870201", "long": "-2.288679", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13145", "Record Last Updated (dd/mm/yyyy)": "02/02/2023", "Operator (or Applicant)": "STOR 136 Limited", "Site Name": "Linton Court Farm, Highnam - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Linton Court Farm, Highnam", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 8DF", "X-coordinate": "380221", "Y-coordinate": "219109", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "22/01374/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.870201", "long": "-2.288679", "status": "planning", "mw": 99, "ext_id": "13145"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "02/02/2023", "to": "08/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/08/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13145", "Record Last Updated (dd/mm/yyyy)": "08/09/2023", "Operator (or Applicant)": "STOR 136 Limited", "Site Name": "Linton Court Farm, Highnam - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Linton Court Farm, Highnam", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 8DF", "X-coordinate": "380221", "Y-coordinate": "219109", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "22/01374/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.870201", "long": "-2.288679", "status": "planning", "mw": 99, "ext_id": "13145"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-08-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Linton Court Farm, Highnam - Battery storage", "name_short": "Linton Court Farm, Highnam", "owner": "STOR 136 Limited", "state": "south west", "country": "uk", "lat": "51.870201", "long": "-2.288679", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.870201+-2.288679", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "city": "", "id": "1127", "external_id": "13225", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "43", "power_mw": "43", "customer": "", "owner": "Falkirk Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1127", "external_id": "13225", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "external_id": "13225", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 43, "power_mw": 43, "owner": "Falkirk Power Limited", "status": "planning", "date_first_heard": "2023-06-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.013724", "long": "-3.782254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13225", "Record Last Updated (dd/mm/yyyy)": "04/07/2023", "Operator (or Applicant)": "Falkirk Power Limited", "Site Name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "43", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " The South East Of Merchiston Industrial Estate Smith Street", "County": "Central", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK2 7PD", "X-coordinate": "288986", "Y-coordinate": "681522", "Planning Authority": "Falkirk Council", "Planning Application Reference": "P/23/0046/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.013724", "long": "-3.782254", "status": "planning", "mw": 43, "ext_id": "13225"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "County", "from": "Central", "to": "Falkirk", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13225", "Record Last Updated (dd/mm/yyyy)": "04/07/2023", "Operator (or Applicant)": "Falkirk Power Limited", "Site Name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "43", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " The South East Of Merchiston Industrial Estate Smith Street", "County": "Falkirk", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK2 7PD", "X-coordinate": "288986", "Y-coordinate": "681522", "Planning Authority": "Falkirk Council", "Planning Application Reference": "P/23/0046/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/06/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.013724", "long": "-3.782254", "status": "planning", "mw": 43, "ext_id": "13225"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 43, "mwh_is_estimate": true, "mwh": 43, "mwh_estimate": 43, "status": "planning", "status_class": "", "date_first_heard": "2023-06-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "name_short": "Merchiston Industrial Estate, Smith...", "owner": "Falkirk Power Limited", "state": "scotland", "country": "uk", "lat": "56.013724", "long": "-3.782254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.013724+-3.782254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "city": "", "id": "1128", "external_id": "13236", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1128", "external_id": "13236", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "external_id": "13236", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Energy Storage Limited", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.26313", "long": "-3.942529", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13236", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Shindour, Feddal Hill, Wood Braco, Dunblane", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK15 9RA", "X-coordinate": "279777", "Y-coordinate": "709545", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/02231/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.26313", "long": "-3.942529", "status": "planning", "mw": 49, "ext_id": "13236"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13236", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " Shindour, Feddal Hill, Wood Braco, Dunblane", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "FK15 9RA", "X-coordinate": "279777", "Y-coordinate": "709545", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/02231/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.26313", "long": "-3.942529", "status": "planning", "mw": 49, "ext_id": "13236"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "name_short": "Shindour, Feddal Hill Wood - Batter...", "owner": "Whirlwind Energy Storage Limited", "state": "scotland", "country": "uk", "lat": "56.26313", "long": "-3.942529", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.26313+-3.942529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Quantans Hill Wind Farm", "city": "", "id": "1129", "external_id": "13238", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vattenfall Wind Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1129", "external_id": "13238", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Quantans Hill Wind Farm", "external_id": "13238", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Vattenfall Wind Power Limited", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.212545", "long": "-4.262613", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13238", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Vattenfall Wind Power Limited", "Site Name": "Quantans Hill Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13237", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Quantans Hill Wind Farm, Carsphairn, Castle Douglas", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG7 3TQ", "X-coordinate": "256137", "Y-coordinate": "593258", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003399", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.212545", "long": "-4.262613", "status": "planning", "mw": 50, "ext_id": "13238"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13238", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Vattenfall Wind Power Limited", "Site Name": "Quantans Hill Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13237", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Quantans Hill Wind Farm, Carsphairn, Castle Douglas", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG7 3TQ", "X-coordinate": "256137", "Y-coordinate": "593258", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003399", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.212545", "long": "-4.262613", "status": "planning", "mw": 50, "ext_id": "13238"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Quantans Hill Wind Farm", "name_short": "Quantans Hill Wind Farm", "owner": "Vattenfall Wind Power Limited", "state": "scotland", "country": "uk", "lat": "55.212545", "long": "-4.262613", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.212545+-4.262613", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "city": "", "id": "1130", "external_id": "13246", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Reliance Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1130", "external_id": "13246", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "external_id": "13246", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Reliance Energy Limited", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.69977", "long": "-1.301359", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13246", "Record Last Updated (dd/mm/yyyy)": "20/02/2023", "Operator (or Applicant)": "Reliance Energy Limited", "Site Name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North East Corner Whelly Hill Farm\n", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS27 3BH", "X-coordinate": "445123", "Y-coordinate": "534084", "Planning Authority": "Hartlepool Council", "Planning Application Reference": "H/2022/0459\t", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.69977", "long": "-1.301359", "status": "planning", "mw": 50, "ext_id": "13246"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/02/2023", "to": "02/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Hartlepool Council", "to": "Hartlepool Borough Council", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "07/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13246", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Reliance Energy Limited", "Site Name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North East Corner Whelly Hill Farm\n", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS27 3BH", "X-coordinate": "445123", "Y-coordinate": "534084", "Planning Authority": "Hartlepool Borough Council", "Planning Application Reference": "H/2022/0459\t", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.69977", "long": "-1.301359", "status": "planning", "mw": 50, "ext_id": "13246"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "name_short": "Whelley Hill Farm, Worset Lane", "owner": "Reliance Energy Limited", "state": "north east", "country": "uk", "lat": "54.69977", "long": "-1.301359", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.69977+-1.301359", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peel Road, Westby With Plumptons - Battery Storage", "city": "", "id": "1132", "external_id": "13300", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1132", "external_id": "13300", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Peel Road, Westby With Plumptons - Battery Storage", "external_id": "13300", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Energi Generation", "status": "planning", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.783376", "long": "-2.977465", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13300", "Record Last Updated (dd/mm/yyyy)": "24/02/2023", "Operator (or Applicant)": "Energi Generation", "Site Name": "Peel Road, Westby With Plumptons - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Peel Road, Opp Sub Station, Westby With Plumptons, Blackpool", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "FY4 5JU", "X-coordinate": "335692", "Y-coordinate": "432338", "Planning Authority": "Fylde Council", "Planning Application Reference": "23/0125", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.783376", "long": "-2.977465", "status": "planning", "mw": 20, "ext_id": "13300"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "24/02/2023", "to": "25/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "22/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13300", "Record Last Updated (dd/mm/yyyy)": "25/09/2023", "Operator (or Applicant)": "Energi Generation", "Site Name": "Peel Road, Westby With Plumptons - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Peel Road, Opp Sub Station, Westby With Plumptons, Blackpool", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "FY4 5JU", "X-coordinate": "335692", "Y-coordinate": "432338", "Planning Authority": "Fylde Council", "Planning Application Reference": "23/0125", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.783376", "long": "-2.977465", "status": "planning", "mw": 20, "ext_id": "13300"}, "current_month": "2024-01", "dates": {"first_heard": "2023-02-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Peel Road, Westby With Plumptons - Battery Storage", "name_short": "Peel Road, Westby With Plumptons", "owner": "Energi Generation", "state": "north west", "country": "uk", "lat": "53.783376", "long": "-2.977465", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.783376+-2.977465", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fairways Business Park - Battery Storage ", "city": "", "id": "1133", "external_id": "13318", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1133", "external_id": "13318", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fairways Business Park - Battery Storage ", "external_id": "13318", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Intelligent Land Investments Group Plc", "status": "planning", "date_first_heard": "2023-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.453909", "long": "-4.211182", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13318", "Record Last Updated (dd/mm/yyyy)": "02/03/2023", "Operator (or Applicant)": "Intelligent Land Investments Group Plc", "Site Name": "Fairways Business Park - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fairways Business Park", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV2 6AA", "X-coordinate": "267424", "Y-coordinate": "842560", "Planning Authority": "Highlands Council", "Planning Application Reference": "23/00497/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.453909", "long": "-4.211182", "status": "planning", "mw": 50, "ext_id": "13318"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Planning Authority", "from": "Highlands Council", "to": "Highland Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13318", "Record Last Updated (dd/mm/yyyy)": "02/03/2023", "Operator (or Applicant)": "Intelligent Land Investments Group Plc", "Site Name": "Fairways Business Park - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fairways Business Park", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV2 6AA", "X-coordinate": "267424", "Y-coordinate": "842560", "Planning Authority": "Highland Council", "Planning Application Reference": "23/00497/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.453909", "long": "-4.211182", "status": "planning", "mw": 50, "ext_id": "13318"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fairways Business Park - Battery Storage ", "name_short": "Fairways Business Park - Battery St...", "owner": "Intelligent Land Investments Group Plc", "state": "scotland", "country": "uk", "lat": "57.453909", "long": "-4.211182", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.453909+-4.211182", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carrington Power Station, Manchester Road - Battery Storage", "city": "", "id": "1134", "external_id": "13362", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1040", "power_mw": "1040", "customer": "", "owner": "Wainstones Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1134", "external_id": "13362", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Carrington Power Station, Manchester Road - Battery Storage", "external_id": "13362", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 1040, "power_mw": 1040, "owner": "Wainstones Energy Limited", "status": "planning", "date_first_heard": "2023-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.433433", "long": "-2.403539", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13362", "Record Last Updated (dd/mm/yyyy)": "06/03/2023", "Operator (or Applicant)": "Wainstones Energy Limited", "Site Name": "Carrington Power Station, Manchester Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1040", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrington Power Station, Manchester Road", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M31 4AY", "X-coordinate": "373287", "Y-coordinate": "393037", "Planning Authority": "Trafford Council", "Planning Application Reference": "110320/FUL/23", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.433433", "long": "-2.403539", "status": "planning", "mw": 1040, "ext_id": "13362"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "NA", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13362", "Record Last Updated (dd/mm/yyyy)": "06/03/2023", "Operator (or Applicant)": "Wainstones Energy Limited", "Site Name": "Carrington Power Station, Manchester Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1040", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrington Power Station, Manchester Road", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "M31 4AY", "X-coordinate": "373287", "Y-coordinate": "393037", "Planning Authority": "Trafford Council", "Planning Application Reference": "110320/FUL/23", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.433433", "long": "-2.403539", "status": "planning", "mw": 1040, "ext_id": "13362"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1040, "mwh_is_estimate": true, "mwh": 1040, "mwh_estimate": 1040, "status": "planning", "status_class": "", "date_first_heard": "2023-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Carrington Power Station, Manchester Road - Battery Storage", "name_short": "Carrington Power Station, Mancheste...", "owner": "Wainstones Energy Limited", "state": "north west", "country": "uk", "lat": "53.433433", "long": "-2.403539", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.433433+-2.403539", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lichfield Road, Watton Lane - Battery Storage", "city": "", "id": "1135", "external_id": "13369", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo ES Water Orton Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1135", "external_id": "13369", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lichfield Road, Watton Lane - Battery Storage", "external_id": "13369", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anglo ES Water Orton Limited", "status": "planning", "date_first_heard": "2023-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.516318", "long": "-1.730976", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13369", "Record Last Updated (dd/mm/yyyy)": "09/03/2023", "Operator (or Applicant)": "Anglo ES Water Orton Limited", "Site Name": "Lichfield Road, Watton Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Junction Lichfield Road Watton Lane Water Orton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B46 1PH", "X-coordinate": "418353", "Y-coordinate": "290971", "Planning Authority": "North Warwickshire Council", "Planning Application Reference": "PAP/2023/0056", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.516318", "long": "-1.730976", "status": "planning", "mw": 49, "ext_id": "13369"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13369", "Record Last Updated (dd/mm/yyyy)": "09/03/2023", "Operator (or Applicant)": "Anglo ES Water Orton Limited", "Site Name": "Lichfield Road, Watton Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Junction Lichfield Road Watton Lane Water Orton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B46 1PH", "X-coordinate": "418353", "Y-coordinate": "290971", "Planning Authority": "North Warwickshire Council", "Planning Application Reference": "PAP/2023/0056", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/02/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.516318", "long": "-1.730976", "status": "planning", "mw": 49, "ext_id": "13369"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lichfield Road, Watton Lane - Battery Storage", "name_short": "Lichfield Road, Watton Lane", "owner": "Anglo ES Water Orton Limited", "state": "west midlands", "country": "uk", "lat": "52.516318", "long": "-1.730976", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.516318+-1.730976", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hollydale, Buildwas Road - Battery Storage", "city": "", "id": "1136", "external_id": "13410", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Telford Four Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1136", "external_id": "13410", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hollydale, Buildwas Road - Battery Storage", "external_id": "13410", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Telford Four Limited", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.637953", "long": "-2.519033", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13410", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "Telford Four Limited", "Site Name": "Hollydale, Buildwas Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "adjacent Hollydale, Buildwas Road, Ironbridge", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "TF8 7BN", "X-coordinate": "364973", "Y-coordinate": "304594", "Planning Authority": "Telford & Wrekin Council", "Planning Application Reference": "TWC/2023/0144", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.637953", "long": "-2.519033", "status": "planning", "mw": 40, "ext_id": "13410"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13410", "Record Last Updated (dd/mm/yyyy)": "13/03/2023", "Operator (or Applicant)": "Telford Four Limited", "Site Name": "Hollydale, Buildwas Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "adjacent Hollydale, Buildwas Road, Ironbridge", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "TF8 7BN", "X-coordinate": "364973", "Y-coordinate": "304594", "Planning Authority": "Telford & Wrekin Council", "Planning Application Reference": "TWC/2023/0144", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.637953", "long": "-2.519033", "status": "planning", "mw": 40, "ext_id": "13410"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hollydale, Buildwas Road - Battery Storage", "name_short": "Hollydale, Buildwas Road", "owner": "Telford Four Limited", "state": "west midlands", "country": "uk", "lat": "52.637953", "long": "-2.519033", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.637953+-2.519033", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "city": "", "id": "1138", "external_id": "13461", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Conrad Energy ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1138", "external_id": "13461", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "external_id": "13461", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Conrad Energy ", "status": "planning", "date_first_heard": "2023-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.447352", "long": "-4.242063", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13461", "Record Last Updated (dd/mm/yyyy)": "20/03/2023", "Operator (or Applicant)": "Conrad Energy ", "Site Name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Landulph Substation, Ellbridge Lane, Landulph, Saltash", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6NB", "X-coordinate": "240913", "Y-coordinate": "63237", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/01323", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447352", "long": "-4.242063", "status": "planning", "mw": 49, "ext_id": "13461"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "20/03/2023", "to": "11/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "05/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13461", "Record Last Updated (dd/mm/yyyy)": "11/09/2023", "Operator (or Applicant)": "Conrad Energy ", "Site Name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj Landulph Substation, Ellbridge Lane, Landulph, Saltash", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL12 6NB", "X-coordinate": "240913", "Y-coordinate": "63237", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/01323", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.447352", "long": "-4.242063", "status": "planning", "mw": 49, "ext_id": "13461"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "name_short": "Landulph Substation, Ellbridge Lane", "owner": "Conrad Energy ", "state": "south west", "country": "uk", "lat": "50.447352", "long": "-4.242063", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.447352+-4.242063", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kemsley Energy Park Battery Storage", "city": "", "id": "1140", "external_id": "13489", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "120", "customer": "", "owner": "FPC Electric Land limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1140", "external_id": "13489", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kemsley Energy Park Battery Storage", "external_id": "13489", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 120, "power_mw": 120, "owner": "FPC Electric Land limited", "status": "planning", "date_first_heard": "2023-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.36675", "long": "0.744796", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13489", "Record Last Updated (dd/mm/yyyy)": "22/03/2023", "Operator (or Applicant)": "FPC Electric Land limited", "Site Name": "Kemsley Energy Park Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "120", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The West Of Barge Way", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME10 2FE", "X-coordinate": "591165", "Y-coordinate": "166652", "Planning Authority": "Swale Council", "Planning Application Reference": "23/500771/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.36675", "long": "0.744796", "status": "planning", "mw": 120, "ext_id": "13489"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13489", "Record Last Updated (dd/mm/yyyy)": "22/03/2023", "Operator (or Applicant)": "FPC Electric Land limited", "Site Name": "Kemsley Energy Park Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "120", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The West Of Barge Way", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "ME10 2FE", "X-coordinate": "591165", "Y-coordinate": "166652", "Planning Authority": "Swale Council", "Planning Application Reference": "23/500771/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.36675", "long": "0.744796", "status": "planning", "mw": 120, "ext_id": "13489"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 120, "mwh_is_estimate": true, "mwh": 120, "mwh_estimate": 120, "status": "planning", "status_class": "", "date_first_heard": "2023-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kemsley Energy Park Battery Storage", "name_short": "Kemsley Energy Park", "owner": "FPC Electric Land limited", "state": "south east", "country": "uk", "lat": "51.36675", "long": "0.744796", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.36675+0.744796", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "city": "", "id": "1141", "external_id": "13550", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1141", "external_id": "13550", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "external_id": "13550", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Novus Renewable Services", "status": "planning", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.839715", "long": "-1.962978", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13550", "Record Last Updated (dd/mm/yyyy)": "30/03/2023", "Operator (or Applicant)": "Novus Renewable Services", "Site Name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13549", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Farm Drointon Lane Grindley", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST18 0LX", "X-coordinate": "402591", "Y-coordinate": "326912", "Planning Authority": "Stafford Council", "Planning Application Reference": "23/36938/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.839715", "long": "-1.962978", "status": "planning", "mw": 30, "ext_id": "13550"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13550", "Record Last Updated (dd/mm/yyyy)": "30/03/2023", "Operator (or Applicant)": "Novus Renewable Services", "Site Name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13549", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Farm Drointon Lane Grindley", "County": "Staffordshire", "Region": "West Midlands", "Country": "England", "Post Code": "ST18 0LX", "X-coordinate": "402591", "Y-coordinate": "326912", "Planning Authority": "Stafford Council", "Planning Application Reference": "23/36938/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.839715", "long": "-1.962978", "status": "planning", "mw": 30, "ext_id": "13550"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "name_short": "Lower Farm, Drointon Lane - Solar f...", "owner": "Novus Renewable Services", "state": "west midlands", "country": "uk", "lat": "52.839715", "long": "-1.962978", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.839715+-1.962978", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hickling Lane, Swainsthorpe -Battery Storage", "city": "", "id": "1142", "external_id": "13560", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "114", "power_mw": "114", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1142", "external_id": "13560", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hickling Lane, Swainsthorpe -Battery Storage", "external_id": "13560", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 114, "power_mw": 114, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2023-09-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.57348", "long": "1.275689", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13560", "Record Last Updated (dd/mm/yyyy)": "03/04/2023", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Hickling Lane, Swainsthorpe -Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "114", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "\nLand North Of Hickling Lane Swainsthorpe\ufffd", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8PW", "X-coordinate": "622065", "Y-coordinate": "302336", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2023/0617", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.57348", "long": "1.275689", "status": "planning", "mw": 114, "ext_id": "13560"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/04/2023", "to": "18/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13560", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Hickling Lane, Swainsthorpe -Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "114", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "\nLand North Of Hickling Lane Swainsthorpe\ufffd", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR14 8PW", "X-coordinate": "622065", "Y-coordinate": "302336", "Planning Authority": "South Norfolk Council", "Planning Application Reference": "2023/0617", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.57348", "long": "1.275689", "status": "planning", "mw": 114, "ext_id": "13560"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 114, "mwh_is_estimate": true, "mwh": 114, "mwh_estimate": 114, "status": "planning", "status_class": "", "date_first_heard": "2023-09-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hickling Lane, Swainsthorpe -Battery Storage", "name_short": "Hickling Lane, Swainsthorpe", "owner": "EDF Energy Renewables", "state": "eastern", "country": "uk", "lat": "52.57348", "long": "1.275689", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.57348+1.275689", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Spennymoor Greener Grid Park", "city": "", "id": "1143", "external_id": "13576", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1143", "external_id": "13576", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Spennymoor Greener Grid Park", "external_id": "13576", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Statkraft UK Limited", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.708471", "long": "-1.538544", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13576", "Record Last Updated (dd/mm/yyyy)": "03/04/2023", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Spennymoor Greener Grid Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Spennymoor, National Grid Station, Thinford Lane, Thinford, Durham", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 5LB", "X-coordinate": "429831", "Y-coordinate": "534926", "Planning Authority": "Durham Council", "Planning Application Reference": "DM/23/00745/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.708471", "long": "-1.538544", "status": "planning", "mw": 200, "ext_id": "13576"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13576", "Record Last Updated (dd/mm/yyyy)": "03/04/2023", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Spennymoor Greener Grid Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Spennymoor, National Grid Station, Thinford Lane, Thinford, Durham", "County": "County Durham", "Region": "North East", "Country": "England", "Post Code": "DH6 5LB", "X-coordinate": "429831", "Y-coordinate": "534926", "Planning Authority": "Durham Council", "Planning Application Reference": "DM/23/00745/FPA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.708471", "long": "-1.538544", "status": "planning", "mw": 200, "ext_id": "13576"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Spennymoor Greener Grid Park", "name_short": "Spennymoor Greener Grid Park", "owner": "Statkraft UK Limited", "state": "north east", "country": "uk", "lat": "54.708471", "long": "-1.538544", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.708471+-1.538544", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "city": "", "id": "1144", "external_id": "13607", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1144", "external_id": "13607", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "external_id": "13607", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Immersa Limited", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.505207", "long": "-2.442992", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13607", "Record Last Updated (dd/mm/yyyy)": "11/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Off Westerleigh Hill Westerleigh", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 8RD", "X-coordinate": "369350", "Y-coordinate": "178568", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/01180/F ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.505207", "long": "-2.442992", "status": "planning", "mw": 200, "ext_id": "13607"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13607", "Record Last Updated (dd/mm/yyyy)": "11/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Off Westerleigh Hill Westerleigh", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 8RD", "X-coordinate": "369350", "Y-coordinate": "178568", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/01180/F ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.505207", "long": "-2.442992", "status": "planning", "mw": 200, "ext_id": "13607"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "name_short": "Westerleigh Hill, Westerleigh - Bat...", "owner": "Immersa Limited", "state": "south west", "country": "uk", "lat": "51.505207", "long": "-2.442992", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.505207+-2.442992", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walpole Bank - Battery Energy Storage Facility", "city": "", "id": "1146", "external_id": "13639", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Field Devco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1146", "external_id": "13639", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walpole Bank - Battery Energy Storage Facility", "external_id": "13639", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Field Devco Limited", "status": "planning", "date_first_heard": "2023-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.722965", "long": "0.210708", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13639", "Record Last Updated (dd/mm/yyyy)": "12/04/2023", "Operator (or Applicant)": "Field Devco Limited", "Site Name": "Walpole Bank - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opp Walpole Sub Station, Walpole Bank, Walpole, Wisbech", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549401", "Y-coordinate": "316216", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02021/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.722965", "long": "0.210708", "status": "planning", "mw": 100, "ext_id": "13639"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13639", "Record Last Updated (dd/mm/yyyy)": "12/04/2023", "Operator (or Applicant)": "Field Devco Limited", "Site Name": "Walpole Bank - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Opp Walpole Sub Station, Walpole Bank, Walpole, Wisbech", "County": "Cambridgeshire", "Region": "Eastern", "Country": "England", "Post Code": "PE14 7HZ", "X-coordinate": "549401", "Y-coordinate": "316216", "Planning Authority": "Borough Council of King's Lynn & West Norfolk", "Planning Application Reference": "22/02021/FM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/11/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.722965", "long": "0.210708", "status": "planning", "mw": 100, "ext_id": "13639"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walpole Bank - Battery Energy Storage Facility", "name_short": "Walpole Bank - Battery Energy", "owner": "Field Devco Limited", "state": "eastern", "country": "uk", "lat": "52.722965", "long": "0.210708", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.722965+0.210708", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "city": "", "id": "1147", "external_id": "13643", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1147", "external_id": "13643", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "external_id": "13643", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Immersa Limited", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.563974", "long": "-2.509709", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13643", "Record Last Updated (dd/mm/yyyy)": "13/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Earthcott Green Farm, Earthcott Green, Alveston, Bristol", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS35 3TD", "X-coordinate": "364765", "Y-coordinate": "185134", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/01244/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.563974", "long": "-2.509709", "status": "planning", "mw": 200, "ext_id": "13643"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13643", "Record Last Updated (dd/mm/yyyy)": "13/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Earthcott Green Farm, Earthcott Green, Alveston, Bristol", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS35 3TD", "X-coordinate": "364765", "Y-coordinate": "185134", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/01244/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.563974", "long": "-2.509709", "status": "planning", "mw": 200, "ext_id": "13643"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "name_short": "Earthcott Green Farm, Earthcott Gre...", "owner": "Immersa Limited", "state": "south west", "country": "uk", "lat": "51.563974", "long": "-2.509709", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.563974+-2.509709", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "city": "", "id": "1148", "external_id": "13644", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1400", "power_mw": "1400", "customer": "", "owner": "Banks Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1148", "external_id": "13644", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "external_id": "13644", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 1400, "power_mw": 1400, "owner": "West Burton Energy / Banks Group", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.580257", "long": "-1.085062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13644", "Record Last Updated (dd/mm/yyyy)": "13/04/2023", "Operator (or Applicant)": "Banks Renewables Limited", "Site Name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1400", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thorpe Marsh Power Station, Marsh Lane, Barnby Dun, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN3 1ET", "X-coordinate": "460674", "Y-coordinate": "409685", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/00537/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.580257", "long": "-1.085062", "status": "planning", "mw": 1400, "ext_id": "13644"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/04/2023", "to": "12/10/2023", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Banks Renewables Limited", "to": "West Burton Energy / Banks Group", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13644", "Record Last Updated (dd/mm/yyyy)": "12/10/2023", "Operator (or Applicant)": "West Burton Energy / Banks Group", "Site Name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "1400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Thorpe Marsh Power Station, Marsh Lane, Barnby Dun, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN3 1ET", "X-coordinate": "460674", "Y-coordinate": "409685", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/00537/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.580257", "long": "-1.085062", "status": "planning", "mw": 1400, "ext_id": "13644"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1400, "mwh_is_estimate": true, "mwh": 1400, "mwh_estimate": 1400, "status": "planning", "status_class": "", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "name_short": "Thorpe Marsh Power Station, Marsh L...", "owner": "West Burton Energy / Banks Group", "state": "yorkshire and humber", "country": "uk", "lat": "53.580257", "long": "-1.085062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.580257+-1.085062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "city": "", "id": "1149", "external_id": "13655", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "GAM Capital Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1149", "external_id": "13655", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "external_id": "13655", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "GAM Capital Limited", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.765711", "long": "-0.231527", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13655", "Record Last Updated (dd/mm/yyyy)": "14/04/2023", "Operator (or Applicant)": "GAM Capital Limited", "Site Name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13655", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South & W/O Froghall Farm, Wyton Road, Preston, Hull", "County": "Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU12 8TY", "X-coordinate": "516668", "Y-coordinate": "431380", "Planning Authority": "East Ridings of Yorkshire Council", "Planning Application Reference": "23/00760/STPLFE", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.765711", "long": "-0.231527", "status": "planning", "mw": 20, "ext_id": "13655"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13655", "Record Last Updated (dd/mm/yyyy)": "14/04/2023", "Operator (or Applicant)": "GAM Capital Limited", "Site Name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13655", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South & W/O Froghall Farm, Wyton Road, Preston, Hull", "County": "Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU12 8TY", "X-coordinate": "516668", "Y-coordinate": "431380", "Planning Authority": "East Ridings of Yorkshire Council", "Planning Application Reference": "23/00760/STPLFE", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.765711", "long": "-0.231527", "status": "planning", "mw": 20, "ext_id": "13655"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "name_short": "Froghall Farm, Wyton Road - Solar F...", "owner": "GAM Capital Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.765711", "long": "-0.231527", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.765711+-0.231527", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Astwood Lane, Feckenham - Battery Storage", "city": "", "id": "1150", "external_id": "13707", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1150", "external_id": "13707", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Astwood Lane, Feckenham - Battery Storage", "external_id": "13707", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Immersa Limited", "status": "planning", "date_first_heard": "2023-04-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.253625", "long": "-1.980736", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13707", "Record Last Updated (dd/mm/yyyy)": "24/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Astwood Lane, Feckenham - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Astwood Lane, Feckenham, Redditch", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "B96 6HP", "X-coordinate": "401412", "Y-coordinate": "261717", "Planning Authority": "Bromsgrove District Council", "Planning Application Reference": "23/00417/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.253625", "long": "-1.980736", "status": "planning", "mw": 200, "ext_id": "13707"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13707", "Record Last Updated (dd/mm/yyyy)": "24/04/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Astwood Lane, Feckenham - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Astwood Lane, Feckenham, Redditch", "County": "Worcestershire", "Region": "West Midlands", "Country": "England", "Post Code": "B96 6HP", "X-coordinate": "401412", "Y-coordinate": "261717", "Planning Authority": "Bromsgrove District Council", "Planning Application Reference": "23/00417/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.253625", "long": "-1.980736", "status": "planning", "mw": 200, "ext_id": "13707"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-04-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Astwood Lane, Feckenham - Battery Storage", "name_short": "Astwood Lane, Feckenham", "owner": "Immersa Limited", "state": "west midlands", "country": "uk", "lat": "52.253625", "long": "-1.980736", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.253625+-1.980736", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coxmoor Wood, Crondall Road - Battery Storage", "city": "", "id": "1151", "external_id": "13728", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Fleet Green Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1151", "external_id": "13728", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coxmoor Wood, Crondall Road - Battery Storage", "external_id": "13728", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Fleet Green Limited", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.261207", "long": "-0.866107", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "13728", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Fleet Green Limited", "Site Name": "Coxmoor Wood, Crondall Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "57", "Share Community Scheme": " ", "CHP Enabled": "No", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "CfD Allocation Round": "", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "North of Coxmoor Wood, off Crondall Road, Crookham Village", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU51 5SU", "X-coordinate": "479215", "Y-coordinate": "151949", "Planning Authority": "Hart District Council", "Planning Application Reference": "23/00823/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "05/04/2023", "Planning Application Withdrawn": " ", "Planning Permission Refused": " ", "Appeal Lodged": " ", "Appeal Withdrawn": " ", "Appeal Refused": " ", "Appeal Granted": " ", "Planning Permission Granted": " ", "Secretary of State - Intervened": " ", "Secretary of State - Refusal": " ", "Secretary of State - Granted": " ", "Planning Permission Expired": " ", "Under Construction": " ", "Operational": " ", "Heat Network Ref": "", "lat": "51.261207", "long": "-0.866107", "status": "planning", "mw": 57, "ext_id": "13728"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Planning Application Withdrawn", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Refused", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Lodged", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Withdrawn", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Refused", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Granted", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Intervened", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Refusal", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Granted", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": " ", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": " ", "Ref ID": "13728", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Fleet Green Limited", "Site Name": "Coxmoor Wood, Crondall Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "57", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "North of Coxmoor Wood, off Crondall Road, Crookham Village", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU51 5SU", "X-coordinate": "479215", "Y-coordinate": "151949", "Planning Authority": "Hart District Council", "Planning Application Reference": "23/00823/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "05/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.261207", "long": "-0.866107", "status": "planning", "mw": 57, "ext_id": "13728"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coxmoor Wood, Crondall Road - Battery Storage", "name_short": "Coxmoor Wood, Crondall Road", "owner": "Fleet Green Limited", "state": "south east", "country": "uk", "lat": "51.261207", "long": "-0.866107", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.261207+-0.866107", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Sale Golf Club, Golf Road - Battery Storage", "city": "", "id": "1152", "external_id": "13731", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "247 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1152", "external_id": "13731", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Sale Golf Club, Golf Road - Battery Storage", "external_id": "13731", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "247 Power Limited", "status": "planning", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.423748", "long": "-2.29036", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13731", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "247 Power Limited", "Site Name": "Sale Golf Club, Golf Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sale Golf Club Golf Road ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "M33 2XU", "X-coordinate": "380802", "Y-coordinate": "391923", "Planning Authority": "Trafford Council", "Planning Application Reference": "110666/FUL/23", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.423748", "long": "-2.29036", "status": "planning", "mw": 70, "ext_id": "13731"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/04/2023", "to": "30/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/11/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13731", "Record Last Updated (dd/mm/yyyy)": "30/11/2023", "Operator (or Applicant)": "247 Power Limited", "Site Name": "Sale Golf Club, Golf Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sale Golf Club Golf Road ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "M33 2XU", "X-coordinate": "380802", "Y-coordinate": "391923", "Planning Authority": "Trafford Council", "Planning Application Reference": "110666/FUL/23", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.423748", "long": "-2.29036", "status": "planning", "mw": 70, "ext_id": "13731"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Sale Golf Club, Golf Road - Battery Storage", "name_short": "Sale Golf Club, Golf Road", "owner": "247 Power Limited", "state": "north west", "country": "uk", "lat": "53.423748", "long": "-2.29036", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.423748+-2.29036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tofts Lane, Hunshelf - Battery Storage", "city": "", "id": "1153", "external_id": "13733", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Harmony HS (JV) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1153", "external_id": "13733", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tofts Lane, Hunshelf - Battery Storage", "external_id": "13733", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Harmony HS (JV) Limited", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.500424", "long": "-1.601386", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13733", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Harmony HS (JV) Limited", "Site Name": "Tofts Lane, Hunshelf - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Tofts Lane, Hunshelf", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S36 8YR", "X-coordinate": "426539", "Y-coordinate": "400488", "Planning Authority": "Barnsley Metropolitan Borough Council", "Planning Application Reference": "2023/0322", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.500424", "long": "-1.601386", "status": "planning", "mw": 40, "ext_id": "13733"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "25/04/2023", "to": "17/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "13/11/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13733", "Record Last Updated (dd/mm/yyyy)": "17/11/2023", "Operator (or Applicant)": "Harmony HS (JV) Limited", "Site Name": "Tofts Lane, Hunshelf - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Tofts Lane, Hunshelf", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S36 8YR", "X-coordinate": "426539", "Y-coordinate": "400488", "Planning Authority": "Barnsley Metropolitan Borough Council", "Planning Application Reference": "2023/0322", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "13/11/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.500424", "long": "-1.601386", "status": "planning", "mw": 40, "ext_id": "13733"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tofts Lane, Hunshelf - Battery Storage", "name_short": "Tofts Lane, Hunshelf", "owner": "Harmony HS (JV) Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.500424", "long": "-1.601386", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.500424+-1.601386", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Welkin Road, Bredbury - Battery Storage System", "city": "", "id": "1154", "external_id": "13740", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1154", "external_id": "13740", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Welkin Road, Bredbury - Battery Storage System", "external_id": "13740", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Arlington Energy Limited", "status": "planning", "date_first_heard": "2021-12-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.416006", "long": "-2.136032", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13740", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Arlington Energy Limited", "Site Name": "Welkin Road, Bredbury - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8275", "Address": "Welkin Road", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391056", "Y-coordinate": "391031", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/078965", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.416006", "long": "-2.136032", "status": "planning", "mw": 20, "ext_id": "13740"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13740", "Record Last Updated (dd/mm/yyyy)": "25/04/2023", "Operator (or Applicant)": "Arlington Energy Limited", "Site Name": "Welkin Road, Bredbury - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "8275", "Address": "Welkin Road", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 2BH", "X-coordinate": "391056", "Y-coordinate": "391031", "Planning Authority": "Stockport Metropolitan Borough Council", "Planning Application Reference": "DC/078965", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/12/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/12/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/12/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.416006", "long": "-2.136032", "status": "planning", "mw": 20, "ext_id": "13740"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2021-12-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Welkin Road, Bredbury - Battery Storage System", "name_short": "Welkin Road, Bredbury - Battery Sto...", "owner": "Arlington Energy Limited", "state": "north west", "country": "uk", "lat": "53.416006", "long": "-2.136032", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.416006+-2.136032", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fair Park Solar Farm", "city": "", "id": "1155", "external_id": "13761", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Downing Renewable Developments Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1155", "external_id": "13761", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fair Park Solar Farm", "external_id": "13761", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Downing Renewable Developments Llp", "status": "planning", "date_first_heard": "2023-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.337819", "long": "-5.007323", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "13761", "Record Last Updated (dd/mm/yyyy)": "27/04/2023", "Operator (or Applicant)": "Downing Renewable Developments Llp", "Site Name": "Fair Park Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13760", "Installed Capacity (MWelec)": "20", "Share Community Scheme": " ", "CHP Enabled": "No", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "CfD Allocation Round": "", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Adj Trewaters Bungalow, S/O Carland Cross, Trispen, Newquay", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "TR8 5BB", "X-coordinate": "186096", "Y-coordinate": "52981", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/02629", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "17/04/2023", "Planning Application Withdrawn": " ", "Planning Permission Refused": " ", "Appeal Lodged": " ", "Appeal Withdrawn": " ", "Appeal Refused": " ", "Appeal Granted": " ", "Planning Permission Granted": " ", "Secretary of State - Intervened": " ", "Secretary of State - Refusal": " ", "Secretary of State - Granted": " ", "Planning Permission Expired": " ", "Under Construction": " ", "Operational": " ", "Heat Network Ref": "", "lat": "50.337819", "long": "-5.007323", "status": "planning", "mw": 20, "ext_id": "13761"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Planning Application Withdrawn", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Refused", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Lodged", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Withdrawn", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Refused", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Appeal Granted", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Intervened", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Refusal", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Secretary of State - Granted", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": " ", "to": "", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": " ", "to": "", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": " ", "Ref ID": "13761", "Record Last Updated (dd/mm/yyyy)": "27/04/2023", "Operator (or Applicant)": "Downing Renewable Developments Llp", "Site Name": "Fair Park Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13760", "Installed Capacity (MWelec)": "20", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Adj Trewaters Bungalow, S/O Carland Cross, Trispen, Newquay", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "TR8 5BB", "X-coordinate": "186096", "Y-coordinate": "52981", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/02629", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "17/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.337819", "long": "-5.007323", "status": "planning", "mw": 20, "ext_id": "13761"}, "current_month": "2024-01", "dates": {"first_heard": "2023-04-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fair Park Solar Farm", "name_short": "Fair Park Solar Farm", "owner": "Downing Renewable Developments Llp", "state": "south west", "country": "uk", "lat": "50.337819", "long": "-5.007323", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.337819+-5.007323", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "city": "", "id": "1156", "external_id": "13774", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Conrad Energy (Developments) Ii Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1156", "external_id": "13774", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "external_id": "13774", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Conrad Energy (Developments) Ii Limited", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.435899", "long": "-1.356632", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13774", "Record Last Updated (dd/mm/yyyy)": "28/06/2023", "Operator (or Applicant)": "Conrad Energy (Developments) Ii Limited", "Site Name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Claire Court, Rawmarsh Road, Northfield", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S60 1RU", "X-coordinate": "442839", "Y-coordinate": "393428", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2023/0542", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.435899", "long": "-1.356632", "status": "planning", "mw": 40, "ext_id": "13774"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13774", "Record Last Updated (dd/mm/yyyy)": "28/06/2023", "Operator (or Applicant)": "Conrad Energy (Developments) Ii Limited", "Site Name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Claire Court, Rawmarsh Road, Northfield", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "S60 1RU", "X-coordinate": "442839", "Y-coordinate": "393428", "Planning Authority": "Rotherham Metropolitan Borough Council", "Planning Application Reference": "RB2023/0542", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/04/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/06/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.435899", "long": "-1.356632", "status": "planning", "mw": 40, "ext_id": "13774"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "name_short": "Claire Court, Rawmarsh Road - Batte...", "owner": "Conrad Energy (Developments) Ii Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.435899", "long": "-1.356632", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.435899+-1.356632", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Melvich Bay - Melvich Wind Energy Hub", "city": "", "id": "1157", "external_id": "13826", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1157", "external_id": "13826", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Melvich Bay - Melvich Wind Energy Hub", "external_id": "13826", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 42, "power_mw": 42, "owner": "Belltown Power Limited", "status": "planning", "date_first_heard": "2023-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.554093", "long": "-3.919253", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13826", "Record Last Updated (dd/mm/yyyy)": "10/05/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Melvich Bay - Melvich Wind Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11669", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Melvich Bay, Melvich, Thurso", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7YJ", "X-coordinate": "288418", "Y-coordinate": "964488", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004515", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.554093", "long": "-3.919253", "status": "planning", "mw": 42, "ext_id": "13826"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13826", "Record Last Updated (dd/mm/yyyy)": "10/05/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Melvich Bay - Melvich Wind Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11669", "Installed Capacity (MWelec)": "42", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Melvich Bay, Melvich, Thurso", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7YJ", "X-coordinate": "288418", "Y-coordinate": "964488", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004515", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.554093", "long": "-3.919253", "status": "planning", "mw": 42, "ext_id": "13826"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 42, "mwh_is_estimate": true, "mwh": 42, "mwh_estimate": 42, "status": "planning", "status_class": "", "date_first_heard": "2023-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Melvich Bay - Melvich Wind Energy Hub", "name_short": "Melvich Bay - Melvich Wind Energy H...", "owner": "Belltown Power Limited", "state": "scotland", "country": "uk", "lat": "58.554093", "long": "-3.919253", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.554093+-3.919253", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bolney - Battery Storage", "city": "", "id": "1158", "external_id": "13880", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Bolney Green Energy Hub Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1158", "external_id": "13880", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bolney - Battery Storage", "external_id": "13880", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Bolney Green Energy Hub Limited", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.96964", "long": "-0.241682", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13880", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Bolney Green Energy Hub Limited", "Site Name": "Bolney - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land east of Wineham Lane, Wineham, Henfield", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "BN5 9AY", "X-coordinate": "523557", "Y-coordinate": "120385", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/21/2276", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.96964", "long": "-0.241682", "status": "planning", "mw": 200, "ext_id": "13880"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13880", "Record Last Updated (dd/mm/yyyy)": "18/05/2023", "Operator (or Applicant)": "Bolney Green Energy Hub Limited", "Site Name": "Bolney - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land east of Wineham Lane, Wineham, Henfield", "County": "West Sussex", "Region": "South East", "Country": "England", "Post Code": "BN5 9AY", "X-coordinate": "523557", "Y-coordinate": "120385", "Planning Authority": "Mid Sussex District Council", "Planning Application Reference": "DM/21/2276", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.96964", "long": "-0.241682", "status": "planning", "mw": 200, "ext_id": "13880"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bolney - Battery Storage", "name_short": "Bolney", "owner": "Bolney Green Energy Hub Limited", "state": "south east", "country": "uk", "lat": "50.96964", "long": "-0.241682", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.96964+-0.241682", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "city": "", "id": "1159", "external_id": "13976", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1159", "external_id": "13976", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "external_id": "13976", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Novus Renewable Services Limited", "status": "planning", "date_first_heard": "2023-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.911726", "long": "-2.659699", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13976", "Record Last Updated (dd/mm/yyyy)": "30/05/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Peterstow Gas Compressor Station, Hentland, Ross on Wye", "County": "Herefordshire", "Region": "West Midlands", "Country": "England", "Post Code": "HR9 6AX", "X-coordinate": "354718", "Y-coordinate": "223894", "Planning Authority": "Hertfordshire County Council", "Planning Application Reference": "P231390/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.911726", "long": "-2.659699", "status": "planning", "mw": 49, "ext_id": "13976"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13976", "Record Last Updated (dd/mm/yyyy)": "30/05/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Peterstow Gas Compressor Station, Hentland, Ross on Wye", "County": "Herefordshire", "Region": "West Midlands", "Country": "England", "Post Code": "HR9 6AX", "X-coordinate": "354718", "Y-coordinate": "223894", "Planning Authority": "Hertfordshire County Council", "Planning Application Reference": "P231390/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.911726", "long": "-2.659699", "status": "planning", "mw": 49, "ext_id": "13976"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "name_short": "Peterstow Gas Compressor Station, H...", "owner": "Novus Renewable Services Limited", "state": "west midlands", "country": "uk", "lat": "51.911726", "long": "-2.659699", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.911726+-2.659699", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Marsh Lane, Gowhole - Energy Storage System", "city": "", "id": "1160", "external_id": "13982", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1160", "external_id": "13982", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Marsh Lane, Gowhole - Energy Storage System", "external_id": "13982", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Novus Renewable Services Limited", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.351096", "long": "-1.984773", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13982", "Record Last Updated (dd/mm/yyyy)": "31/05/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Marsh Lane, Gowhole - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Marsh Lane, Gowhole, High Peak", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK23 7QE", "X-coordinate": "401111", "Y-coordinate": "383801", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2023/0193", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.351096", "long": "-1.984773", "status": "planning", "mw": 30, "ext_id": "13982"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13982", "Record Last Updated (dd/mm/yyyy)": "31/05/2023", "Operator (or Applicant)": "Novus Renewable Services Limited", "Site Name": "Marsh Lane, Gowhole - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Marsh Lane, Gowhole, High Peak", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK23 7QE", "X-coordinate": "401111", "Y-coordinate": "383801", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2023/0193", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.351096", "long": "-1.984773", "status": "planning", "mw": 30, "ext_id": "13982"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Marsh Lane, Gowhole - Energy Storage System", "name_short": "Marsh Lane, Gowhole", "owner": "Novus Renewable Services Limited", "state": "east midlands", "country": "uk", "lat": "53.351096", "long": "-1.984773", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.351096+-1.984773", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "city": "", "id": "1161", "external_id": "13986", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Drumlithie Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1161", "external_id": "13986", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "external_id": "13986", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Drumlithie Battery Limited", "status": "planning", "date_first_heard": "2023-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.928116", "long": "-2.345951", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13986", "Record Last Updated (dd/mm/yyyy)": "31/05/2023", "Operator (or Applicant)": "Drumlithie Battery Limited", "Site Name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Site To The North West Of Forest Avenue Cottage Drumlithie Stonehaven ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB39 3YH", "X-coordinate": "379042", "Y-coordinate": "781922", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0940", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.928116", "long": "-2.345951", "status": "planning", "mw": 49, "ext_id": "13986"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/05/2023", "to": "30/11/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "14/11/2028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "13986", "Record Last Updated (dd/mm/yyyy)": "30/11/2023", "Operator (or Applicant)": "Drumlithie Battery Limited", "Site Name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Site To The North West Of Forest Avenue Cottage Drumlithie Stonehaven ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB39 3YH", "X-coordinate": "379042", "Y-coordinate": "781922", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/0940", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2028", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.928116", "long": "-2.345951", "status": "planning", "mw": 49, "ext_id": "13986"}, "current_month": "2024-01", "dates": {"first_heard": "2023-05-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "name_short": "Forest Avenue Cottage, Drumlithie", "owner": "Drumlithie Battery Limited", "state": "scotland", "country": "uk", "lat": "56.928116", "long": "-2.345951", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.928116+-2.345951", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Abhainn Dubh Wind Farm", "city": "", "id": "1163", "external_id": "14039", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "E Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1163", "external_id": "14039", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Abhainn Dubh Wind Farm", "external_id": "14039", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "E Power Limited", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.540694", "long": "-5.71141", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14039", "Record Last Updated (dd/mm/yyyy)": "09/06/2023", "Operator (or Applicant)": "E Power Limited", "Site Name": "Abhainn Dubh Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11357", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Abhainn Dubh Wind Farm, Abhainn Dubh, Strathcarron", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV54 8XH", "X-coordinate": "177978", "Y-coordinate": "856137", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004732", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.540694", "long": "-5.71141", "status": "planning", "mw": 30, "ext_id": "14039"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14039", "Record Last Updated (dd/mm/yyyy)": "09/06/2023", "Operator (or Applicant)": "E Power Limited", "Site Name": "Abhainn Dubh Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11357", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Abhainn Dubh Wind Farm, Abhainn Dubh, Strathcarron", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV54 8XH", "X-coordinate": "177978", "Y-coordinate": "856137", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004732", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.540694", "long": "-5.71141", "status": "planning", "mw": 30, "ext_id": "14039"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Abhainn Dubh Wind Farm", "name_short": "Abhainn Dubh Wind Farm", "owner": "E Power Limited", "state": "scotland", "country": "uk", "lat": "57.540694", "long": "-5.71141", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.540694+-5.71141", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "J3 Business Park - Battery Storage Facility", "city": "", "id": "1164", "external_id": "14054", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Forepower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1164", "external_id": "14054", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "J3 Business Park - Battery Storage Facility", "external_id": "14054", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 16, "power_mw": 16, "owner": "Forepower Limited", "status": "planning", "date_first_heard": "2023-07-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.502987", "long": "-1.12784", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14054", "Record Last Updated (dd/mm/yyyy)": "13/06/2023", "Operator (or Applicant)": "Forepower Limited", "Site Name": "J3 Business Park - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Balby Carr Bank, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN4 8DE", "X-coordinate": "\t457947", "Y-coordinate": "\t401053", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/01072/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.502987", "long": "-1.12784", "status": "planning", "mw": 16, "ext_id": "14054"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "11/07/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "14054", "Record Last Updated (dd/mm/yyyy)": "13/06/2023", "Operator (or Applicant)": "Forepower Limited", "Site Name": "J3 Business Park - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "16", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Balby Carr Bank, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN4 8DE", "X-coordinate": "\t457947", "Y-coordinate": "\t401053", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/01072/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/07/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/07/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.502987", "long": "-1.12784", "status": "planning", "mw": 16, "ext_id": "14054"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 16, "mwh_is_estimate": true, "mwh": 16, "mwh_estimate": 16, "status": "planning", "status_class": "", "date_first_heard": "2023-07-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "J3 Business Park - Battery Storage Facility", "name_short": "J3 Business Park", "owner": "Forepower Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.502987", "long": "-1.12784", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.502987+-1.12784", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Eccles II Substation - Battery Energy Storage System", "city": "", "id": "1165", "external_id": "14058", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Intergen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1165", "external_id": "14058", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Eccles II Substation - Battery Energy Storage System", "external_id": "14058", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Intergen", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.672137", "long": "-2.326335", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14058", "Record Last Updated (dd/mm/yyyy)": "13/06/2023", "Operator (or Applicant)": "Intergen", "Site Name": "Eccles II Substation - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, approximately 2.3 km S/O Leitholm", "County": "Scottish Borders ", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 4JA", "X-coordinate": "379573", "Y-coordinate": "642119", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004804", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.672137", "long": "-2.326335", "status": "planning", "mw": 500, "ext_id": "14058"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14058", "Record Last Updated (dd/mm/yyyy)": "13/06/2023", "Operator (or Applicant)": "Intergen", "Site Name": "Eccles II Substation - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Eccles Substation, approximately 2.3 km S/O Leitholm", "County": "Scottish Borders ", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD12 4JA", "X-coordinate": "379573", "Y-coordinate": "642119", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004804", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.672137", "long": "-2.326335", "status": "planning", "mw": 500, "ext_id": "14058"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Eccles II Substation - Battery Energy Storage System", "name_short": "Eccles II Substation - Battery", "owner": "Intergen", "state": "scotland", "country": "uk", "lat": "55.672137", "long": "-2.326335", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.672137+-2.326335", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lower Larks Farm - Battery storage", "city": "", "id": "1166", "external_id": "14076", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "RE Projects Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1166", "external_id": "14076", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lower Larks Farm - Battery storage", "external_id": "14076", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "RE Projects Development Limited", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.569086", "long": "-2.48078", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14076", "Record Last Updated (dd/mm/yyyy)": "15/06/2023", "Operator (or Applicant)": "RE Projects Development Limited", "Site Name": "Lower Larks Farm - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Larks Farm Larks Lane Iron Acton ", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "366774", "Y-coordinate": "185689", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P22/03743/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/04/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569086", "long": "-2.48078", "status": "planning", "mw": 99, "ext_id": "14076"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14076", "Record Last Updated (dd/mm/yyyy)": "15/06/2023", "Operator (or Applicant)": "RE Projects Development Limited", "Site Name": "Lower Larks Farm - Battery storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Larks Farm Larks Lane Iron Acton ", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "366774", "Y-coordinate": "185689", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P22/03743/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/04/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/04/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569086", "long": "-2.48078", "status": "planning", "mw": 99, "ext_id": "14076"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lower Larks Farm - Battery storage", "name_short": "Lower Larks Farm", "owner": "RE Projects Development Limited", "state": "south west", "country": "uk", "lat": "51.569086", "long": "-2.48078", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.569086+-2.48078", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Larks Lane, Iron Acton - Battery Storage Facility", "city": "", "id": "1167", "external_id": "14091", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "HD000ACT Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1167", "external_id": "14091", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Larks Lane, Iron Acton - Battery Storage Facility", "external_id": "14091", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "HD000ACT Limited", "status": "planning", "date_first_heard": "2023-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.569889", "long": "-2.477859", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14091", "Record Last Updated (dd/mm/yyyy)": "16/06/2023", "Operator (or Applicant)": "HD000ACT Limited", "Site Name": "Larks Lane, Iron Acton - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Larks Lane, E/O Larks Lane, Bristol", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "366977", "Y-coordinate": "185777", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P23/01616/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569889", "long": "-2.477859", "status": "planning", "mw": 20, "ext_id": "14091"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14091", "Record Last Updated (dd/mm/yyyy)": "16/06/2023", "Operator (or Applicant)": "HD000ACT Limited", "Site Name": "Larks Lane, Iron Acton - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Larks Lane, E/O Larks Lane, Bristol", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TX", "X-coordinate": "366977", "Y-coordinate": "185777", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P23/01616/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.569889", "long": "-2.477859", "status": "planning", "mw": 20, "ext_id": "14091"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Larks Lane, Iron Acton - Battery Storage Facility", "name_short": "Larks Lane, Iron Acton", "owner": "HD000ACT Limited", "state": "south west", "country": "uk", "lat": "51.569889", "long": "-2.477859", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.569889+-2.477859", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Quarterland Road, Islandmagee - Battery Storage", "city": "", "id": "1168", "external_id": "14117", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Solo Renewables Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1168", "external_id": "14117", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Quarterland Road, Islandmagee - Battery Storage", "external_id": "14117", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 75, "power_mw": 75, "owner": "Solo Renewables Ltd", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.84755", "long": "-5.777836", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14117", "Record Last Updated (dd/mm/yyyy)": "20/06/2023", "Operator (or Applicant)": "Solo Renewables Ltd", "Site Name": "Quarterland Road, Islandmagee - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "75", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Quarterland Road, Islandmagee", "County": "Mid & East Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT40 3RW", "X-coordinate": "\t157572", "Y-coordinate": "\t556847", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA02/2023/1283/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.84755", "long": "-5.777836", "status": "planning", "mw": 75, "ext_id": "14117"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14117", "Record Last Updated (dd/mm/yyyy)": "20/06/2023", "Operator (or Applicant)": "Solo Renewables Ltd", "Site Name": "Quarterland Road, Islandmagee - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "75", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Quarterland Road, Islandmagee", "County": "Mid & East Antrim", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT40 3RW", "X-coordinate": "\t157572", "Y-coordinate": "\t556847", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA02/2023/1283/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.84755", "long": "-5.777836", "status": "planning", "mw": 75, "ext_id": "14117"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 75, "mwh_is_estimate": true, "mwh": 75, "mwh_estimate": 75, "status": "planning", "status_class": "", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Quarterland Road, Islandmagee - Battery Storage", "name_short": "Quarterland Road, Islandmagee", "owner": "Solo Renewables Ltd", "state": "northern ireland", "country": "uk", "lat": "54.84755", "long": "-5.777836", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.84755+-5.777836", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Doogary Road, Omagh - Battery Storage", "city": "", "id": "1169", "external_id": "14125", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Omagh BES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1169", "external_id": "14125", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Doogary Road, Omagh - Battery Storage", "external_id": "14125", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Omagh BES Limited", "status": "planning", "date_first_heard": "2023-06-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.572483", "long": "-7.279008", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14125", "Record Last Updated (dd/mm/yyyy)": "21/06/2023", "Operator (or Applicant)": "Omagh BES Limited", "Site Name": "Doogary Road, Omagh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "160m Northwest Of No 80 Doogary Road, Omagh", "County": "Fermanagh & Omagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT79 0BJ", "X-coordinate": "58975", "Y-coordinate": "532518", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA10/2023/1605/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572483", "long": "-7.279008", "status": "planning", "mw": 40, "ext_id": "14125"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "County", "from": "Fermanagh & Omagh", "to": "Co. Fermanagh & Omagh", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "14125", "Record Last Updated (dd/mm/yyyy)": "21/06/2023", "Operator (or Applicant)": "Omagh BES Limited", "Site Name": "Doogary Road, Omagh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "160m Northwest Of No 80 Doogary Road, Omagh", "County": "Co. Fermanagh & Omagh", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT79 0BJ", "X-coordinate": "58975", "Y-coordinate": "532518", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA10/2023/1605/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/03/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572483", "long": "-7.279008", "status": "planning", "mw": 40, "ext_id": "14125"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-06-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Doogary Road, Omagh - Battery Storage", "name_short": "Doogary Road, Omagh", "owner": "Omagh BES Limited", "state": "northern ireland", "country": "uk", "lat": "54.572483", "long": "-7.279008", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.572483+-7.279008", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ash Farm, Titchfield Lane - Battery Storage", "city": "", "id": "1170", "external_id": "14145", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Botley Energy Reserve 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1170", "external_id": "14145", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ash Farm, Titchfield Lane - Battery Storage", "external_id": "14145", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Botley Energy Reserve 2 Limited", "status": "planning", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.886208", "long": "-1.217522", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14145", "Record Last Updated (dd/mm/yyyy)": "27/06/2023", "Operator (or Applicant)": "Botley Energy Reserve 2 Limited", "Site Name": "Ash Farm, Titchfield Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Titchfield Lane, Whiteley, Fareham", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO15 6DY", "X-coordinate": "455138", "Y-coordinate": "109927", "Planning Authority": "Winchester City Council", "Planning Application Reference": "23/01106/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.886208", "long": "-1.217522", "status": "planning", "mw": 15, "ext_id": "14145"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14145", "Record Last Updated (dd/mm/yyyy)": "27/06/2023", "Operator (or Applicant)": "Botley Energy Reserve 2 Limited", "Site Name": "Ash Farm, Titchfield Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Titchfield Lane, Whiteley, Fareham", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "PO15 6DY", "X-coordinate": "455138", "Y-coordinate": "109927", "Planning Authority": "Winchester City Council", "Planning Application Reference": "23/01106/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.886208", "long": "-1.217522", "status": "planning", "mw": 15, "ext_id": "14145"}, "current_month": "2024-01", "dates": {"first_heard": "2023-06-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "planning", "status_class": "", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ash Farm, Titchfield Lane - Battery Storage", "name_short": "Ash Farm, Titchfield Lane", "owner": "Botley Energy Reserve 2 Limited", "state": "south east", "country": "uk", "lat": "50.886208", "long": "-1.217522", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.886208+-1.217522", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bishopmill - Battery Energy Storage", "city": "", "id": "1171", "external_id": "14191", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1171", "external_id": "14191", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bishopmill - Battery Energy Storage", "external_id": "14191", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Green Power Consultants", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.669842", "long": "-3.31029", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14191", "Record Last Updated (dd/mm/yyyy)": "03/07/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Bishopmill - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "To E/O A941 Bishopmill, Elgin", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV30 4FF", "X-coordinate": "321938", "Y-coordinate": "865196", "Planning Authority": "Moray Council", "Planning Application Reference": "23/00994/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.669842", "long": "-3.31029", "status": "planning", "mw": 30, "ext_id": "14191"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "03/07/2023", "to": "02/01/2024", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "21/12/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "14191", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Bishopmill - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "To E/O A941 Bishopmill, Elgin", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV30 4FF", "X-coordinate": "321938", "Y-coordinate": "865196", "Planning Authority": "Moray Council", "Planning Application Reference": "23/00994/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "21/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "21/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.669842", "long": "-3.31029", "status": "planning", "mw": 30, "ext_id": "14191"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bishopmill - Battery Energy Storage", "name_short": "Bishopmill", "owner": "Green Power Consultants", "state": "scotland", "country": "uk", "lat": "57.669842", "long": "-3.31029", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.669842+-3.31029", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Clough Road - Battery Energy System", "city": "", "id": "1172", "external_id": "14225", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "GAM Capital Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1172", "external_id": "14225", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Clough Road - Battery Energy System", "external_id": "14225", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 130, "power_mw": 130, "owner": "GAM Capital Limited", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.767186", "long": "-0.339722", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14225", "Record Last Updated (dd/mm/yyyy)": "06/07/2023", "Operator (or Applicant)": "GAM Capital Limited", "Site Name": "Clough Road - Battery Energy System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "130", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Clough Road, Kingston Upon Hull", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU5 1SW", "X-coordinate": "509533", "Y-coordinate": "431372", "Planning Authority": "Hull City Council", "Planning Application Reference": "23/02771/FULL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.767186", "long": "-0.339722", "status": "planning", "mw": 130, "ext_id": "14225"}, "first_month": "2023-07", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/07/2023", "to": "20/09/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "12/09/2026", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "14225", "Record Last Updated (dd/mm/yyyy)": "20/09/2023", "Operator (or Applicant)": "GAM Capital Limited", "Site Name": "Clough Road - Battery Energy System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "130", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Clough Road, Kingston Upon Hull", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU5 1SW", "X-coordinate": "509533", "Y-coordinate": "431372", "Planning Authority": "Hull City Council", "Planning Application Reference": "23/02771/FULL ", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.767186", "long": "-0.339722", "status": "planning", "mw": 130, "ext_id": "14225"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 130, "mwh_is_estimate": true, "mwh": 130, "mwh_estimate": 130, "status": "planning", "status_class": "", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Clough Road - Battery Energy System", "name_short": "Clough Road - Battery Energy System", "owner": "GAM Capital Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.767186", "long": "-0.339722", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.767186+-0.339722", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Frome Power, Styles Close - Energy Storage Facility", "city": "", "id": "1173", "external_id": "14227", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Trina Solar UK Hold Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1173", "external_id": "14227", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Frome Power, Styles Close - Energy Storage Facility", "external_id": "14227", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Trina Solar UK Hold Co Limited", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.230434", "long": "-2.303287", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14227", "Record Last Updated (dd/mm/yyyy)": "06/07/2023", "Operator (or Applicant)": "Trina Solar UK Hold Co Limited", "Site Name": "Frome Power, Styles Close - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "CfD Allocation Round": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Styles Close & E/O The Existing Frome, 132/33kv Bulk Supply Point Substation, Frome", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "BA11 5JS", "X-coordinate": "378920", "Y-coordinate": "147960", "Planning Authority": "Somerset County Council", "Planning Application Reference": "2023/1070/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.230434", "long": "-2.303287", "status": "planning", "mw": 30, "ext_id": "14227"}, "first_month": "2023-07", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14227", "Record Last Updated (dd/mm/yyyy)": "06/07/2023", "Operator (or Applicant)": "Trina Solar UK Hold Co Limited", "Site Name": "Frome Power, Styles Close - Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O Styles Close & E/O The Existing Frome, 132/33kv Bulk Supply Point Substation, Frome", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "BA11 5JS", "X-coordinate": "378920", "Y-coordinate": "147960", "Planning Authority": "Somerset County Council", "Planning Application Reference": "2023/1070/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.230434", "long": "-2.303287", "status": "planning", "mw": 30, "ext_id": "14227"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Frome Power, Styles Close - Energy Storage Facility", "name_short": "Frome Power, Styles Close - Energy", "owner": "Trina Solar UK Hold Co Limited", "state": "south west", "country": "uk", "lat": "51.230434", "long": "-2.303287", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.230434+-2.303287", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chingjia Energy", "city": "", "id": "1175", "external_id": "", "state": "", "country": "taiwan", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Chingjia Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.222065", "long": "120.945036", "coords_hint": "-2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1693770142554189983", "link2": "", "link3": "", "link4": ""}, "internal_id": "1175", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chingjia Energy", "name_short": "Chingjia", "owner": "Chingjia Energy", "state": "", "country": "taiwan", "lat": "24.222065", "long": "120.945036", "coords_hint": -2, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the country is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:24.222065+120.945036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/Tesla_Megapack/status/1693770142554189983"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "West Leake Lane, Ratcliffe - Battery Storage", "city": "", "id": "1192", "external_id": "12464", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "600", "customer": "", "owner": "Sandbrook Capital BES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1192", "external_id": "12464", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Leake Lane, Ratcliffe - Battery Storage", "external_id": "12464", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 600, "power_mw": 600, "owner": "Sandbrook Capital BES Limited", "status": "planning", "date_first_heard": "2023-07-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.833796", "long": "-1.216974", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12464", "Record Last Updated (dd/mm/yyyy)": "31/07/2023", "Operator (or Applicant)": "Sandbrook Capital BES Limited", "Site Name": "West Leake Lane, Ratcliffe - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "600", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Leake Lane West Leake Lane Ratcliffe On Soar ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "LE12 5RF", "X-coordinate": "452849", "Y-coordinate": "326540", "Planning Authority": "Rushcliffe Council", "Planning Application Reference": "23/01285/FUL\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.833796", "long": "-1.216974", "status": "planning", "mw": 600, "ext_id": "12464"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12464", "Record Last Updated (dd/mm/yyyy)": "31/07/2023", "Operator (or Applicant)": "Sandbrook Capital BES Limited", "Site Name": "West Leake Lane, Ratcliffe - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "600", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Leake Lane West Leake Lane Ratcliffe On Soar ", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "LE12 5RF", "X-coordinate": "452849", "Y-coordinate": "326540", "Planning Authority": "Rushcliffe Council", "Planning Application Reference": "23/01285/FUL\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.833796", "long": "-1.216974", "status": "planning", "mw": 600, "ext_id": "12464"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 600, "mwh_is_estimate": true, "mwh": 600, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2023-07-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Leake Lane, Ratcliffe - Battery Storage", "name_short": "West Leake Lane, Ratcliffe", "owner": "Sandbrook Capital BES Limited", "state": "east midlands", "country": "uk", "lat": "52.833796", "long": "-1.216974", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.833796+-1.216974", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "city": "", "id": "1193", "external_id": "12496", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pulse Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1193", "external_id": "12496", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "external_id": "12496", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pulse Clean Energy", "status": "planning", "date_first_heard": "2023-05-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.249813", "long": "-0.875342", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12496", "Record Last Updated (dd/mm/yyyy)": "14/09/2023", "Operator (or Applicant)": "Pulse Clean Energy", "Site Name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blue Bell Lodge Rye Common Lane Crondall", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DE", "X-coordinate": "478590", "Y-coordinate": "150672", "Planning Authority": "Hart District Council", "Planning Application Reference": "22/02917/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.249813", "long": "-0.875342", "status": "planning", "mw": 49, "ext_id": "12496"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12496", "Record Last Updated (dd/mm/yyyy)": "14/09/2023", "Operator (or Applicant)": "Pulse Clean Energy", "Site Name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blue Bell Lodge Rye Common Lane Crondall", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DE", "X-coordinate": "478590", "Y-coordinate": "150672", "Planning Authority": "Hart District Council", "Planning Application Reference": "22/02917/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/01/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/05/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/05/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.249813", "long": "-0.875342", "status": "planning", "mw": 49, "ext_id": "12496"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-05-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "name_short": "Blue Bell Lodge, Rye Common Lane", "owner": "Pulse Clean Energy", "state": "south east", "country": "uk", "lat": "51.249813", "long": "-0.875342", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.249813+-0.875342", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barfield Lane, Reepham - Battery Energy Storage System", "city": "", "id": "1194", "external_id": "12600", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "53", "power_mw": "53", "customer": "", "owner": "Fiskerton Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1194", "external_id": "12600", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barfield Lane, Reepham - Battery Energy Storage System", "external_id": "12600", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 53, "power_mw": 53, "owner": "Fiskerton Bess Limited", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.250093", "long": "-0.445801", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12600", "Record Last Updated (dd/mm/yyyy)": "27/09/2023", "Operator (or Applicant)": "Fiskerton Bess Limited", "Site Name": "Barfield Lane, Reepham - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "53", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Barfield Lane, Reepham, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "LN3 4DP", "X-coordinate": "503796", "Y-coordinate": "373691", "Planning Authority": "West Lindsey District Council", "Planning Application Reference": "147131", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.250093", "long": "-0.445801", "status": "planning", "mw": 53, "ext_id": "12600"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12600", "Record Last Updated (dd/mm/yyyy)": "27/09/2023", "Operator (or Applicant)": "Fiskerton Bess Limited", "Site Name": "Barfield Lane, Reepham - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "53", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Barfield Lane, Reepham, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "LN3 4DP", "X-coordinate": "503796", "Y-coordinate": "373691", "Planning Authority": "West Lindsey District Council", "Planning Application Reference": "147131", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.250093", "long": "-0.445801", "status": "planning", "mw": 53, "ext_id": "12600"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 53, "mwh_is_estimate": true, "mwh": 53, "mwh_estimate": 53, "status": "planning", "status_class": "", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barfield Lane, Reepham - Battery Energy Storage System", "name_short": "Barfield Lane, Reepham - Battery", "owner": "Fiskerton Bess Limited", "state": "east midlands", "country": "uk", "lat": "53.250093", "long": "-0.445801", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.250093+-0.445801", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "East Chickerell Court Farm - Battery Energy Storage System", "city": "", "id": "1195", "external_id": "12651", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1195", "external_id": "12651", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Chickerell Court Farm - Battery Energy Storage System", "external_id": "12651", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.628557", "long": "-2.490346", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12651", "Record Last Updated (dd/mm/yyyy)": "06/10/2023", "Operator (or Applicant)": "Statera Energy", "Site Name": "East Chickerell Court Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Chickerell Court Farm, Chickerell, Weymouth", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT3 4BG", "X-coordinate": "365414", "Y-coordinate": "81099", "Planning Authority": "Dorset Council", "Planning Application Reference": "P/FUL/2023/04657", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.628557", "long": "-2.490346", "status": "planning", "mw": 400, "ext_id": "12651"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12651", "Record Last Updated (dd/mm/yyyy)": "06/10/2023", "Operator (or Applicant)": "Statera Energy", "Site Name": "East Chickerell Court Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Chickerell Court Farm, Chickerell, Weymouth", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "DT3 4BG", "X-coordinate": "365414", "Y-coordinate": "81099", "Planning Authority": "Dorset Council", "Planning Application Reference": "P/FUL/2023/04657", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.628557", "long": "-2.490346", "status": "planning", "mw": 400, "ext_id": "12651"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Chickerell Court Farm - Battery Energy Storage System", "name_short": "East Chickerell Court Farm - Batter...", "owner": "Statera Energy", "state": "south west", "country": "uk", "lat": "50.628557", "long": "-2.490346", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.628557+-2.490346", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Old Vicarage, Reedley - Battery Storage", "city": "", "id": "1196", "external_id": "12767", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "European Energy A/S", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1196", "external_id": "12767", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Old Vicarage, Reedley - Battery Storage", "external_id": "12767", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "European Energy A/S", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.817249", "long": "-2.253053", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12767", "Record Last Updated (dd/mm/yyyy)": "17/08/2023", "Operator (or Applicant)": "European Energy A/S", "Site Name": "The Old Vicarage, Reedley - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O The Old Vicarage, Greenhead Lane, Reedley, Burnley", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB12 9NR", "X-coordinate": "383437", "Y-coordinate": "435693", "Planning Authority": "Pendle Borough Council", "Planning Application Reference": "23/0507/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.817249", "long": "-2.253053", "status": "planning", "mw": 100, "ext_id": "12767"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12767", "Record Last Updated (dd/mm/yyyy)": "17/08/2023", "Operator (or Applicant)": "European Energy A/S", "Site Name": "The Old Vicarage, Reedley - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O The Old Vicarage, Greenhead Lane, Reedley, Burnley", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB12 9NR", "X-coordinate": "383437", "Y-coordinate": "435693", "Planning Authority": "Pendle Borough Council", "Planning Application Reference": "23/0507/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.817249", "long": "-2.253053", "status": "planning", "mw": 100, "ext_id": "12767"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Old Vicarage, Reedley - Battery Storage", "name_short": "The Old Vicarage, Reedley", "owner": "European Energy A/S", "state": "north west", "country": "uk", "lat": "53.817249", "long": "-2.253053", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.817249+-2.253053", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Shetland Battery Energy Storage System", "city": "", "id": "1197", "external_id": "12856", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1197", "external_id": "12856", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Shetland Battery Energy Storage System", "external_id": "12856", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "Zenobe Energy", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "60.169164", "long": "-1.168878", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12856", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Shetland Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Blackhill Industrial Estate, Genista, Lerwick", "County": "Islands", "Region": "Scotland", "Country": "Scotland", "Post Code": "ZE1 0DG", "X-coordinate": "446222", "Y-coordinate": "1143036", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004881", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "60.169164", "long": "-1.168878", "status": "planning", "mw": 70, "ext_id": "12856"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12856", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Shetland Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lower Blackhill Industrial Estate, Genista, Lerwick", "County": "Islands", "Region": "Scotland", "Country": "Scotland", "Post Code": "ZE1 0DG", "X-coordinate": "446222", "Y-coordinate": "1143036", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004881", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "60.169164", "long": "-1.168878", "status": "planning", "mw": 70, "ext_id": "12856"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Shetland Battery Energy Storage System", "name_short": "Shetland Battery", "owner": "Zenobe Energy", "state": "scotland", "country": "uk", "lat": "60.169164", "long": "-1.168878", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:60.169164+-1.168878", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rigifa Cove Road - Battery Storage", "city": "", "id": "1198", "external_id": "12970", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Source Galileo Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1198", "external_id": "12970", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rigifa Cove Road - Battery Storage", "external_id": "12970", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Source Galileo Limited", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.093185", "long": "-2.083467", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12970", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Source Galileo Limited", "Site Name": "Rigifa Cove Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rigifa Cove Road, Aberdeen", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB12 3LR", "X-coordinate": "395041", "Y-coordinate": "800247", "Planning Authority": "Aberdeen City Council", "Planning Application Reference": "231336/DPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.093185", "long": "-2.083467", "status": "planning", "mw": 49, "ext_id": "12970"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12970", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Source Galileo Limited", "Site Name": "Rigifa Cove Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rigifa Cove Road, Aberdeen", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB12 3LR", "X-coordinate": "395041", "Y-coordinate": "800247", "Planning Authority": "Aberdeen City Council", "Planning Application Reference": "231336/DPP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.093185", "long": "-2.083467", "status": "planning", "mw": 49, "ext_id": "12970"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rigifa Cove Road - Battery Storage", "name_short": "Rigifa Cove Road", "owner": "Source Galileo Limited", "state": "scotland", "country": "uk", "lat": "57.093185", "long": "-2.083467", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.093185+-2.083467", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kinmuck Battery Energy Storage", "city": "", "id": "1199", "external_id": "13001", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "105", "power_mw": "105", "customer": "", "owner": "Kinmuck Energy Storage Limited / Island Green Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1199", "external_id": "13001", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kinmuck Battery Energy Storage", "external_id": "13001", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 105, "power_mw": 105, "owner": "Kinmuck Energy Storage Limited / Island Green Power", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.416021", "long": "-2.007609", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13001", "Record Last Updated (dd/mm/yyyy)": "09/10/2023", "Operator (or Applicant)": "Kinmuck Energy Storage Limited / Island Green Power", "Site Name": "Kinmuck Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "105", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kinmuck Farm, Ellon", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB41 8DB", "X-coordinate": "399642", "Y-coordinate": "\t836183", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004907", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.416021", "long": "-2.007609", "status": "planning", "mw": 105, "ext_id": "13001"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13001", "Record Last Updated (dd/mm/yyyy)": "09/10/2023", "Operator (or Applicant)": "Kinmuck Energy Storage Limited / Island Green Power", "Site Name": "Kinmuck Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "105", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kinmuck Farm, Ellon", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB41 8DB", "X-coordinate": "399642", "Y-coordinate": "\t836183", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004907", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.416021", "long": "-2.007609", "status": "planning", "mw": 105, "ext_id": "13001"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 105, "mwh_is_estimate": true, "mwh": 105, "mwh_estimate": 105, "status": "planning", "status_class": "", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kinmuck Battery Energy Storage", "name_short": "Kinmuck", "owner": "Kinmuck Energy Storage Limited / Island Green Power", "state": "scotland", "country": "uk", "lat": "57.416021", "long": "-2.007609", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.416021+-2.007609", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "city": "", "id": "1200", "external_id": "13217", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Boom Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1200", "external_id": "13217", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "external_id": "13217", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Boom Developments Limited", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.399804", "long": "-4.44122", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13217", "Record Last Updated (dd/mm/yyyy)": "04/09/2023", "Operator (or Applicant)": "Boom Developments Limited", "Site Name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrog Ganol, Rhosgoch", "County": "Isle of Anglesey", "Region": "Wales", "Country": "Wales", "Post Code": "LL66 0AY", "X-coordinate": "237793", "Y-coordinate": "391997", "Planning Authority": "Isle of Anglesey Council", "Planning Application Reference": "FPL/2023/218", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.399804", "long": "-4.44122", "status": "planning", "mw": 49, "ext_id": "13217"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13217", "Record Last Updated (dd/mm/yyyy)": "04/09/2023", "Operator (or Applicant)": "Boom Developments Limited", "Site Name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Carrog Ganol, Rhosgoch", "County": "Isle of Anglesey", "Region": "Wales", "Country": "Wales", "Post Code": "LL66 0AY", "X-coordinate": "237793", "Y-coordinate": "391997", "Planning Authority": "Isle of Anglesey Council", "Planning Application Reference": "FPL/2023/218", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.399804", "long": "-4.44122", "status": "planning", "mw": 49, "ext_id": "13217"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "name_short": "Carrog Ganol, Rhosgoch - Battery", "owner": "Boom Developments Limited", "state": "wales", "country": "uk", "lat": "53.399804", "long": "-4.44122", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.399804+-4.44122", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "city": "", "id": "1201", "external_id": "13310", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1201", "external_id": "13310", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "external_id": "13310", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "RES Limited", "status": "planning", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.778118", "long": "-3.057189", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13310", "Record Last Updated (dd/mm/yyyy)": "01/03/2023", "Operator (or Applicant)": "RES Limited", "Site Name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13176", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O Penicuik & Ne/O Stow, Moorfoot Hills, Gorebridge village, Edinburgh", "County": "Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH23 4TR", "X-coordinate": "333786", "Y-coordinate": "654372", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004661", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.778118", "long": "-3.057189", "status": "planning", "mw": 50, "ext_id": "13310"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13310", "Record Last Updated (dd/mm/yyyy)": "01/03/2023", "Operator (or Applicant)": "RES Limited", "Site Name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13176", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O Penicuik & Ne/O Stow, Moorfoot Hills, Gorebridge village, Edinburgh", "County": "Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH23 4TR", "X-coordinate": "333786", "Y-coordinate": "654372", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004661", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.778118", "long": "-3.057189", "status": "planning", "mw": 50, "ext_id": "13310"}, "current_month": "2024-01", "dates": {"first_heard": "2023-03-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "name_short": "Penicuik, Moorfoot Hills - Torfiche...", "owner": "RES Limited", "state": "scotland", "country": "uk", "lat": "55.778118", "long": "-3.057189", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.778118+-3.057189", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "city": "", "id": "1202", "external_id": "13323", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1202", "external_id": "13323", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "external_id": "13323", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "RNA Energy Limited", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.570895", "long": "-4.481011", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13323", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "RNA Energy Limited", "Site Name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Inchbean Farm, Treeswoodhead Road, Shortlees, Kilmarnock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5LL", "X-coordinate": "243666", "Y-coordinate": "633598", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004968", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.570895", "long": "-4.481011", "status": "planning", "mw": 60, "ext_id": "13323"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13323", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "RNA Energy Limited", "Site Name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Inchbean Farm, Treeswoodhead Road, Shortlees, Kilmarnock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5LL", "X-coordinate": "243666", "Y-coordinate": "633598", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004968", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.570895", "long": "-4.481011", "status": "planning", "mw": 60, "ext_id": "13323"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "name_short": "Inchbean Farm, Treeswoodhead Road -...", "owner": "RNA Energy Limited", "state": "scotland", "country": "uk", "lat": "55.570895", "long": "-4.481011", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.570895+-4.481011", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Learielaw Farm, Learielaw - Battery Energy Storage", "city": "", "id": "1203", "external_id": "13368", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1203", "external_id": "13368", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Learielaw Farm, Learielaw - Battery Energy Storage", "external_id": "13368", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Intelligent Land Investments Group", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.920858", "long": "-3.463207", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13368", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Learielaw Farm, Learielaw - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7970", "Address": "Learielaw Farm, Learielaw, Broxburn", "County": "Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH52 5PG", "X-coordinate": "308656", "Y-coordinate": "670720", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004983", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.920858", "long": "-3.463207", "status": "planning", "mw": 100, "ext_id": "13368"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13368", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Intelligent Land Investments Group", "Site Name": "Learielaw Farm, Learielaw - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7970", "Address": "Learielaw Farm, Learielaw, Broxburn", "County": "Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH52 5PG", "X-coordinate": "308656", "Y-coordinate": "670720", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004983", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.920858", "long": "-3.463207", "status": "planning", "mw": 100, "ext_id": "13368"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Learielaw Farm, Learielaw - Battery Energy Storage", "name_short": "Learielaw Farm, Learielaw", "owner": "Intelligent Land Investments Group", "state": "scotland", "country": "uk", "lat": "55.920858", "long": "-3.463207", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.920858+-3.463207", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "city": "", "id": "1204", "external_id": "13449", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1204", "external_id": "13449", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "external_id": "13449", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Private Developer", "status": "planning", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.783683", "long": "-4.191709", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13449", "Record Last Updated (dd/mm/yyyy)": "22/09/2023", "Operator (or Applicant)": "Private Developer", "Site Name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Rogerton Cottage, Markethill Road, East Kilbride, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G74 4NU", "X-coordinate": "262652", "Y-coordinate": "656660", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/23/1033", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.783683", "long": "-4.191709", "status": "planning", "mw": 50, "ext_id": "13449"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13449", "Record Last Updated (dd/mm/yyyy)": "22/09/2023", "Operator (or Applicant)": "Private Developer", "Site Name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Rogerton Cottage, Markethill Road, East Kilbride, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G74 4NU", "X-coordinate": "262652", "Y-coordinate": "656660", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/23/1033", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.783683", "long": "-4.191709", "status": "planning", "mw": 50, "ext_id": "13449"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "name_short": "East Rogerton Cottage, Markethill R...", "owner": "Private Developer", "state": "scotland", "country": "uk", "lat": "55.783683", "long": "-4.191709", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.783683+-4.191709", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newton Farm, Westburn Road - Battery Storage Facility", "city": "", "id": "1205", "external_id": "13450", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Bluefield Renewable Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1205", "external_id": "13450", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newton Farm, Westburn Road - Battery Storage Facility", "external_id": "13450", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Bluefield Renewable Developments Limited", "status": "planning", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.820793", "long": "-4.121448", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13450", "Record Last Updated (dd/mm/yyyy)": "04/08/2023", "Operator (or Applicant)": "Bluefield Renewable Developments Limited", "Site Name": "Newton Farm, Westburn Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "310m Ne/O Newhouse Farm, Newton Farm, Westburn Road, Cambuslang", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G72 7UZ", "X-coordinate": "267184", "Y-coordinate": "660652", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/23/0886", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.820793", "long": "-4.121448", "status": "planning", "mw": 40, "ext_id": "13450"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13450", "Record Last Updated (dd/mm/yyyy)": "04/08/2023", "Operator (or Applicant)": "Bluefield Renewable Developments Limited", "Site Name": "Newton Farm, Westburn Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "310m Ne/O Newhouse Farm, Newton Farm, Westburn Road, Cambuslang", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G72 7UZ", "X-coordinate": "267184", "Y-coordinate": "660652", "Planning Authority": "South Lanarkshire Council", "Planning Application Reference": "P/23/0886", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.820793", "long": "-4.121448", "status": "planning", "mw": 40, "ext_id": "13450"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newton Farm, Westburn Road - Battery Storage Facility", "name_short": "Newton Farm, Westburn Road", "owner": "Bluefield Renewable Developments Limited", "state": "scotland", "country": "uk", "lat": "55.820793", "long": "-4.121448", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.820793+-4.121448", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Longcroft Wind Farm", "city": "", "id": "1206", "external_id": "13539", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Energy Systems", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1206", "external_id": "13539", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Longcroft Wind Farm", "external_id": "13539", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Renewable Energy Systems", "status": "planning", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.794504", "long": "-2.728687", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13539", "Record Last Updated (dd/mm/yyyy)": "17/11/2023", "Operator (or Applicant)": "Renewable Energy Systems", "Site Name": "Longcroft Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13538", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Longcroft Wind Farm Land East Of Longcroft Farmhouse Oxton", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD2 6QZ", "X-coordinate": "354410", "Y-coordinate": "655930", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004774", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.794504", "long": "-2.728687", "status": "planning", "mw": 50, "ext_id": "13539"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13539", "Record Last Updated (dd/mm/yyyy)": "17/11/2023", "Operator (or Applicant)": "Renewable Energy Systems", "Site Name": "Longcroft Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13538", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Longcroft Wind Farm Land East Of Longcroft Farmhouse Oxton", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD2 6QZ", "X-coordinate": "354410", "Y-coordinate": "655930", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004774", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.794504", "long": "-2.728687", "status": "planning", "mw": 50, "ext_id": "13539"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Longcroft Wind Farm", "name_short": "Longcroft Wind Farm", "owner": "Renewable Energy Systems", "state": "scotland", "country": "uk", "lat": "55.794504", "long": "-2.728687", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.794504+-2.728687", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Butts Field, Mill Lane - Battery Storage", "city": "", "id": "1207", "external_id": "13573", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Ecotricity Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1207", "external_id": "13573", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Butts Field, Mill Lane - Battery Storage", "external_id": "13573", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Ecotricity Generation Limited", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.896281", "long": "-1.343237", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13573", "Record Last Updated (dd/mm/yyyy)": "15/12/2023", "Operator (or Applicant)": "Ecotricity Generation Limited", "Site Name": "Butts Field, Mill Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Butts Field Mill Lane, Nursling, Southampton", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO19 0EP", "X-coordinate": "446285", "Y-coordinate": "110961", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "23/02942/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.896281", "long": "-1.343237", "status": "planning", "mw": 99, "ext_id": "13573"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13573", "Record Last Updated (dd/mm/yyyy)": "15/12/2023", "Operator (or Applicant)": "Ecotricity Generation Limited", "Site Name": "Butts Field, Mill Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Butts Field Mill Lane, Nursling, Southampton", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO19 0EP", "X-coordinate": "446285", "Y-coordinate": "110961", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "23/02942/FULLS", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.896281", "long": "-1.343237", "status": "planning", "mw": 99, "ext_id": "13573"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Butts Field, Mill Lane - Battery Storage", "name_short": "Butts Field, Mill Lane", "owner": "Ecotricity Generation Limited", "state": "south east", "country": "uk", "lat": "50.896281", "long": "-1.343237", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.896281+-1.343237", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "city": "", "id": "1208", "external_id": "13595", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Epsilon Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1208", "external_id": "13595", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "external_id": "13595", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Epsilon Generation", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.462653", "long": "-3.094766", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13595", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Epsilon Generation", "Site Name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dormitories Star Inn Farm C12 From A90 At Star Inn Farm To U329 At Mains Of Fowlis\ufffd", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 5EJ", "X-coordinate": "332638", "Y-coordinate": "730594", "Planning Authority": "Dundee City Council", "Planning Application Reference": "23/00539/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.462653", "long": "-3.094766", "status": "planning", "mw": 49, "ext_id": "13595"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13595", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Epsilon Generation", "Site Name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dormitories Star Inn Farm C12 From A90 At Star Inn Farm To U329 At Mains Of Fowlis\ufffd", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD2 5EJ", "X-coordinate": "332638", "Y-coordinate": "730594", "Planning Authority": "Dundee City Council", "Planning Application Reference": "23/00539/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "20/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "20/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.462653", "long": "-3.094766", "status": "planning", "mw": 49, "ext_id": "13595"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "name_short": "Dormitories Star Inn Farm, Mains Of...", "owner": "Epsilon Generation", "state": "scotland", "country": "uk", "lat": "56.462653", "long": "-3.094766", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.462653+-3.094766", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dolphingstone Farm - Battery Energy Storage System", "city": "", "id": "1209", "external_id": "13618", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "63", "power_mw": "63", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1209", "external_id": "13618", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dolphingstone Farm - Battery Energy Storage System", "external_id": "13618", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 63, "power_mw": 63, "owner": "RNA Energy Limited", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.94457", "long": "-2.990629", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13618", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "RNA Energy Limited", "Site Name": "Dolphingstone Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "63", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dolphingstone Farm, Tranent", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH33 1NH", "X-coordinate": "338226", "Y-coordinate": "672835", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004969", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.94457", "long": "-2.990629", "status": "planning", "mw": 63, "ext_id": "13618"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13618", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "RNA Energy Limited", "Site Name": "Dolphingstone Farm - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "63", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Dolphingstone Farm, Tranent", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH33 1NH", "X-coordinate": "338226", "Y-coordinate": "672835", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004969", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.94457", "long": "-2.990629", "status": "planning", "mw": 63, "ext_id": "13618"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 63, "mwh_is_estimate": true, "mwh": 63, "mwh_estimate": 63, "status": "planning", "status_class": "", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dolphingstone Farm - Battery Energy Storage System", "name_short": "Dolphingstone Farm - Battery", "owner": "RNA Energy Limited", "state": "scotland", "country": "uk", "lat": "55.94457", "long": "-2.990629", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.94457+-2.990629", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Persley Croft - Battery Storage", "city": "", "id": "1210", "external_id": "13684", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RE Projects Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1210", "external_id": "13684", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Persley Croft - Battery Storage", "external_id": "13684", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "RE Projects Development", "status": "planning", "date_first_heard": "2023-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.182309", "long": "-2.147753", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13684", "Record Last Updated (dd/mm/yyyy)": "29/09/2023", "Operator (or Applicant)": "RE Projects Development", "Site Name": "Persley Croft - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Persley Croft ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB22 8AN", "X-coordinate": "391167", "Y-coordinate": "810175", "Planning Authority": "Aberdeen Council", "Planning Application Reference": "231134/DPP", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "12/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.182309", "long": "-2.147753", "status": "planning", "mw": 49, "ext_id": "13684"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13684", "Record Last Updated (dd/mm/yyyy)": "29/09/2023", "Operator (or Applicant)": "RE Projects Development", "Site Name": "Persley Croft - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Persley Croft ", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB22 8AN", "X-coordinate": "391167", "Y-coordinate": "810175", "Planning Authority": "Aberdeen Council", "Planning Application Reference": "231134/DPP", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "12/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.182309", "long": "-2.147753", "status": "planning", "mw": 49, "ext_id": "13684"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Persley Croft - Battery Storage", "name_short": "Persley Croft", "owner": "RE Projects Development", "state": "scotland", "country": "uk", "lat": "57.182309", "long": "-2.147753", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.182309+-2.147753", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "city": "", "id": "1211", "external_id": "13695", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1211", "external_id": "13695", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "external_id": "13695", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 75, "power_mw": 75, "owner": "Exagen", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.366093", "long": "-1.619303", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13695", "Record Last Updated (dd/mm/yyyy)": "06/10/2023", "Operator (or Applicant)": "Exagen", "Site Name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13694", "Installed Capacity (MWelec)": "75", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Holly Lane Energy Park", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B37 7AN", "X-coordinate": "426019", "Y-coordinate": "274295", "Planning Authority": "Warwick District Council", "Planning Application Reference": "W/23/1358", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.366093", "long": "-1.619303", "status": "planning", "mw": 75, "ext_id": "13695"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13695", "Record Last Updated (dd/mm/yyyy)": "06/10/2023", "Operator (or Applicant)": "Exagen", "Site Name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13694", "Installed Capacity (MWelec)": "75", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Holly Lane Energy Park", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B37 7AN", "X-coordinate": "426019", "Y-coordinate": "274295", "Planning Authority": "Warwick District Council", "Planning Application Reference": "W/23/1358", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.366093", "long": "-1.619303", "status": "planning", "mw": 75, "ext_id": "13695"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 75, "mwh_is_estimate": true, "mwh": 75, "mwh_estimate": 75, "status": "planning", "status_class": "", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "name_short": "Holly Lane Energy Park - Solar Farm...", "owner": "Exagen", "state": "west midlands", "country": "uk", "lat": "52.366093", "long": "-1.619303", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.366093+-1.619303", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Belasis Avenue - Battery Storage", "city": "", "id": "1212", "external_id": "13850", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Story Construction Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1212", "external_id": "13850", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Belasis Avenue - Battery Storage", "external_id": "13850", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 75, "power_mw": 75, "owner": "Story Construction Limited", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.599425", "long": "-1.263916", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "13850", "Record Last Updated (dd/mm/yyyy)": "04/09/2023", "Operator (or Applicant)": "Story Construction Limited", "Site Name": "Belasis Avenue - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "75", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "South Side Of Belasis Avenue", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS23 1LQ", "X-coordinate": "447653", "Y-coordinate": "522943", "Planning Authority": "Stockton-on-Tees Borough Council", "Planning Application Reference": "23/1634/FUL ", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.599425", "long": "-1.263916", "status": "planning", "mw": 75, "ext_id": "13850"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "13850", "Record Last Updated (dd/mm/yyyy)": "04/09/2023", "Operator (or Applicant)": "Story Construction Limited", "Site Name": "Belasis Avenue - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "75", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "South Side Of Belasis Avenue", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS23 1LQ", "X-coordinate": "447653", "Y-coordinate": "522943", "Planning Authority": "Stockton-on-Tees Borough Council", "Planning Application Reference": "23/1634/FUL ", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.599425", "long": "-1.263916", "status": "planning", "mw": 75, "ext_id": "13850"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 75, "mwh_is_estimate": true, "mwh": 75, "mwh_estimate": 75, "status": "planning", "status_class": "", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Belasis Avenue - Battery Storage", "name_short": "Belasis Avenue", "owner": "Story Construction Limited", "state": "north east", "country": "uk", "lat": "54.599425", "long": "-1.263916", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.599425+-1.263916", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bradley Road - Battery Energy Storage System", "city": "", "id": "1213", "external_id": "13863", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Renewable Connections Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1213", "external_id": "13863", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bradley Road - Battery Energy Storage System", "external_id": "13863", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Renewable Connections Developments Limited", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.546455", "long": "-0.122768", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13863", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Renewable Connections Developments Limited", "Site Name": "Bradley Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13862", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Bradley Road, Grimsby ", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN37 0AG", "X-coordinate": "524480", "Y-coordinate": "407174", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/1156/23/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.546455", "long": "-0.122768", "status": "planning", "mw": 10, "ext_id": "13863"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13863", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Renewable Connections Developments Limited", "Site Name": "Bradley Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13862", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Bradley Road, Grimsby ", "County": "North East Lincolnshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN37 0AG", "X-coordinate": "524480", "Y-coordinate": "407174", "Planning Authority": "North East Lincolnshire Council", "Planning Application Reference": "DM/1156/23/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.546455", "long": "-0.122768", "status": "planning", "mw": 10, "ext_id": "13863"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bradley Road - Battery Energy Storage System", "name_short": "Bradley Road - Battery", "owner": "Renewable Connections Developments Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.546455", "long": "-0.122768", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.546455+-0.122768", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "city": "", "id": "1214", "external_id": "13949", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Infinergy Limited / Boralex", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1214", "external_id": "13949", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "external_id": "13949", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Infinergy Limited / Boralex", "status": "planning", "date_first_heard": "2023-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.552425", "long": "-4.059429", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13949", "Record Last Updated (dd/mm/yyyy)": "24/10/2023", "Operator (or Applicant)": "Infinergy Limited / Boralex", "Site Name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South West Of Loch Toftingall, East Of The A9 & North Of Halsary Wind Farm", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7SB", "X-coordinate": "280257", "Y-coordinate": "964544", "Planning Authority": "Highland Council", "Planning Application Reference": "23/04690/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.552425", "long": "-4.059429", "status": "planning", "mw": 49, "ext_id": "13949"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13949", "Record Last Updated (dd/mm/yyyy)": "24/10/2023", "Operator (or Applicant)": "Infinergy Limited / Boralex", "Site Name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land To The South West Of Loch Toftingall, East Of The A9 & North Of Halsary Wind Farm", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW14 7SB", "X-coordinate": "280257", "Y-coordinate": "964544", "Planning Authority": "Highland Council", "Planning Application Reference": "23/04690/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.552425", "long": "-4.059429", "status": "planning", "mw": 49, "ext_id": "13949"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "name_short": "Loch Toftingall, Halsary Wind Farm", "owner": "Infinergy Limited / Boralex", "state": "scotland", "country": "uk", "lat": "58.552425", "long": "-4.059429", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.552425+-4.059429", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "city": "", "id": "1215", "external_id": "13985", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Queequeg Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1215", "external_id": "13985", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "external_id": "13985", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Queequeg Renewables Limited", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.408054", "long": "-2.117233", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13985", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Queequeg Renewables Limited", "Site Name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Goyt Hall Farm Goyt Valley Footpath Bredbury Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 3LH", "X-coordinate": "392304", "Y-coordinate": "390144", "Planning Authority": "Stockport Metropolitan Borough council", "Planning Application Reference": "DC/090340", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.408054", "long": "-2.117233", "status": "planning", "mw": 40, "ext_id": "13985"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13985", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Queequeg Renewables Limited", "Site Name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Goyt Hall Farm Goyt Valley Footpath Bredbury Stockport", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK6 3LH", "X-coordinate": "392304", "Y-coordinate": "390144", "Planning Authority": "Stockport Metropolitan Borough council", "Planning Application Reference": "DC/090340", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.408054", "long": "-2.117233", "status": "planning", "mw": 40, "ext_id": "13985"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "name_short": "Goyt Hall Farm, Goyt Valley Footpat...", "owner": "Queequeg Renewables Limited", "state": "north west", "country": "uk", "lat": "53.408054", "long": "-2.117233", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.408054+-2.117233", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bluebell Wood Solar Farm & Battery Storage", "city": "", "id": "1216", "external_id": "13989", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon UK Solar Investment Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1216", "external_id": "13989", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bluebell Wood Solar Farm & Battery Storage", "external_id": "13989", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Low Carbon UK Solar Investment Co Limited", "status": "planning", "date_first_heard": "2023-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.285019", "long": "-2.260271", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "13989", "Record Last Updated (dd/mm/yyyy)": "20/11/2023", "Operator (or Applicant)": "Low Carbon UK Solar Investment Co Limited", "Site Name": "Bluebell Wood Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13988", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Flexham Farm, Bradford Road, Rode, Frome", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "BA14 9NE", "X-coordinate": "381945", "Y-coordinate": "154019", "Planning Authority": "Somerset County Council", "Planning Application Reference": "2023/2183/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.285019", "long": "-2.260271", "status": "planning", "mw": 50, "ext_id": "13989"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "13989", "Record Last Updated (dd/mm/yyyy)": "20/11/2023", "Operator (or Applicant)": "Low Carbon UK Solar Investment Co Limited", "Site Name": "Bluebell Wood Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13988", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Flexham Farm, Bradford Road, Rode, Frome", "County": "Somerset", "Region": "South West", "Country": "England", "Post Code": "BA14 9NE", "X-coordinate": "381945", "Y-coordinate": "154019", "Planning Authority": "Somerset County Council", "Planning Application Reference": "2023/2183/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.285019", "long": "-2.260271", "status": "planning", "mw": 50, "ext_id": "13989"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bluebell Wood Solar Farm & Battery Storage", "name_short": "Bluebell Wood Solar Farm &", "owner": "Low Carbon UK Solar Investment Co Limited", "state": "south west", "country": "uk", "lat": "51.285019", "long": "-2.260271", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.285019+-2.260271", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Weston Lane - Battery Storage Facility", "city": "", "id": "1217", "external_id": "14005", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1217", "external_id": "14005", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Weston Lane - Battery Storage Facility", "external_id": "14005", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anglo Renewables Limited", "status": "planning", "date_first_heard": "2024-01-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.892577", "long": "-1.356341", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14005", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Weston Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "\tLand At Weston Lane Nursling ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO19 9HX", "X-coordinate": "445367", "Y-coordinate": "110541", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "23/03055/FULLS", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.892577", "long": "-1.356341", "status": "planning", "mw": 49, "ext_id": "14005"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14005", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "Anglo Renewables Limited", "Site Name": "Weston Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "\tLand At Weston Lane Nursling ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "SO19 9HX", "X-coordinate": "445367", "Y-coordinate": "110541", "Planning Authority": "Test Valley Borough Council", "Planning Application Reference": "23/03055/FULLS", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.892577", "long": "-1.356341", "status": "planning", "mw": 49, "ext_id": "14005"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2024-01-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Weston Lane - Battery Storage Facility", "name_short": "Weston Lane", "owner": "Anglo Renewables Limited", "state": "south east", "country": "uk", "lat": "50.892577", "long": "-1.356341", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.892577+-1.356341", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Balk, Almholme - Energy Storage System", "city": "", "id": "1218", "external_id": "14061", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1025", "power_mw": "1025", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1218", "external_id": "14061", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Balk, Almholme - Energy Storage System", "external_id": "14061", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 1025, "power_mw": 1025, "owner": "Innova Renewables", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.567083", "long": "-1.131339", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14061", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "The Balk, Almholme - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14060", "Installed Capacity (MWelec)": "1025", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The Balk, Almholme, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN5 0LL ", "X-coordinate": "457628", "Y-coordinate": "408181", "Planning Authority": "Doncaster Metropolitan Borough Council", "Planning Application Reference": "23/02482/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.567083", "long": "-1.131339", "status": "planning", "mw": 1025, "ext_id": "14061"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14061", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "The Balk, Almholme - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14060", "Installed Capacity (MWelec)": "1025", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The Balk, Almholme, Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN5 0LL ", "X-coordinate": "457628", "Y-coordinate": "408181", "Planning Authority": "Doncaster Metropolitan Borough Council", "Planning Application Reference": "23/02482/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.567083", "long": "-1.131339", "status": "planning", "mw": 1025, "ext_id": "14061"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 1025, "mwh_is_estimate": true, "mwh": 1025, "mwh_estimate": 1025, "status": "planning", "status_class": "", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Balk, Almholme - Energy Storage System", "name_short": "The Balk, Almholme", "owner": "Innova Renewables", "state": "yorkshire and humber", "country": "uk", "lat": "53.567083", "long": "-1.131339", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udccf", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.567083+-1.131339", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Illeybrook Farm - Battery Energy Storage", "city": "", "id": "1219", "external_id": "14064", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Net Zero Eleven Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1219", "external_id": "14064", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Illeybrook Farm - Battery Energy Storage", "external_id": "14064", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 99, "power_mw": 99, "owner": "Net Zero Eleven Limited", "status": "planning", "date_first_heard": "2023-08-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.434647", "long": "-2.036272", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14064", "Record Last Updated (dd/mm/yyyy)": "14/08/2023", "Operator (or Applicant)": "Net Zero Eleven Limited", "Site Name": "Illeybrook Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.8", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Illeybrook Farm, Illey Lane, Halesowen", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B62 0HE", "X-coordinate": "\t397631", "Y-coordinate": "\t281853", "Planning Authority": "Dudley Metropolitan Borough Council", "Planning Application Reference": "P23/0940", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.434647", "long": "-2.036272", "status": "planning", "mw": 99, "ext_id": "14064"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14064", "Record Last Updated (dd/mm/yyyy)": "14/08/2023", "Operator (or Applicant)": "Net Zero Eleven Limited", "Site Name": "Illeybrook Farm - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "99.8", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Illeybrook Farm, Illey Lane, Halesowen", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "B62 0HE", "X-coordinate": "\t397631", "Y-coordinate": "\t281853", "Planning Authority": "Dudley Metropolitan Borough Council", "Planning Application Reference": "P23/0940", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.434647", "long": "-2.036272", "status": "planning", "mw": 99, "ext_id": "14064"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 99, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "2023-08-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Illeybrook Farm - Battery Energy Storage", "name_short": "Illeybrook Farm", "owner": "Net Zero Eleven Limited", "state": "west midlands", "country": "uk", "lat": "52.434647", "long": "-2.036272", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.434647+-2.036272", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chillington Estate, Chillington Park - Battery Storage", "city": "", "id": "1220", "external_id": "14088", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Elgin Energy Esco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1220", "external_id": "14088", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chillington Estate, Chillington Park - Battery Storage", "external_id": "14088", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Elgin Energy Esco Limited", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.658658", "long": "-2.203415", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14088", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Elgin Energy Esco Limited", "Site Name": "Chillington Estate, Chillington Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14087", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chillington Estate Chillington Park Chillington", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV8 1RE", "X-coordinate": "386338", "Y-coordinate": "306790", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00576/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.658658", "long": "-2.203415", "status": "planning", "mw": 40, "ext_id": "14088"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14088", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Elgin Energy Esco Limited", "Site Name": "Chillington Estate, Chillington Park - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14087", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chillington Estate Chillington Park Chillington", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV8 1RE", "X-coordinate": "386338", "Y-coordinate": "306790", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00576/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.658658", "long": "-2.203415", "status": "planning", "mw": 40, "ext_id": "14088"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chillington Estate, Chillington Park - Battery Storage", "name_short": "Chillington Estate, Chillington Par...", "owner": "Elgin Energy Esco Limited", "state": "west midlands", "country": "uk", "lat": "52.658658", "long": "-2.203415", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.658658+-2.203415", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Enoch Hill, Dalmellington - Battery Storage", "city": "", "id": "1221", "external_id": "14090", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "11", "power_mw": "11", "customer": "", "owner": "RWE Renewables Uk Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1221", "external_id": "14090", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Enoch Hill, Dalmellington - Battery Storage", "external_id": "14090", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 11, "power_mw": 11, "owner": "RWE Renewables Uk Limited", "status": "planning", "date_first_heard": "2023-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.324802", "long": "-4.441643", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14090", "Record Last Updated (dd/mm/yyyy)": "28/09/2023", "Operator (or Applicant)": "RWE Renewables Uk Limited", "Site Name": "Enoch Hill, Dalmellington - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7769", "Installed Capacity (MWelec)": "11", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Enoch Hill, 2 Wind Farm, Dalmellington", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7QA", "X-coordinate": "245186", "Y-coordinate": "606131", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0469/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.324802", "long": "-4.441643", "status": "planning", "mw": 11, "ext_id": "14090"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14090", "Record Last Updated (dd/mm/yyyy)": "28/09/2023", "Operator (or Applicant)": "RWE Renewables Uk Limited", "Site Name": "Enoch Hill, Dalmellington - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7769", "Installed Capacity (MWelec)": "11", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Enoch Hill, 2 Wind Farm, Dalmellington", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 7QA", "X-coordinate": "245186", "Y-coordinate": "606131", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0469/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.324802", "long": "-4.441643", "status": "planning", "mw": 11, "ext_id": "14090"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 11, "mwh_is_estimate": true, "mwh": 11, "mwh_estimate": 11, "status": "planning", "status_class": "", "date_first_heard": "2023-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Enoch Hill, Dalmellington - Battery Storage", "name_short": "Enoch Hill, Dalmellington", "owner": "RWE Renewables Uk Limited", "state": "scotland", "country": "uk", "lat": "55.324802", "long": "-4.441643", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.324802+-4.441643", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wardlaw Wood Windfarm - Battery Storage", "city": "", "id": "1222", "external_id": "14231", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Community Windpower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1222", "external_id": "14231", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wardlaw Wood Windfarm - Battery Storage", "external_id": "14231", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Community Windpower Limited", "status": "planning", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.723168", "long": "-4.753233", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14231", "Record Last Updated (dd/mm/yyyy)": "20/09/2023", "Operator (or Applicant)": "Community Windpower Limited", "Site Name": "Wardlaw Wood Windfarm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4691", "Installed Capacity (MWelec)": "19.99", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "East Of Wardlaw Wood Windfarm", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 5HR", "X-coordinate": "227179", "Y-coordinate": "651185", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00593/PP ", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "04/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.723168", "long": "-4.753233", "status": "planning", "mw": 19, "ext_id": "14231"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14231", "Record Last Updated (dd/mm/yyyy)": "20/09/2023", "Operator (or Applicant)": "Community Windpower Limited", "Site Name": "Wardlaw Wood Windfarm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4691", "Installed Capacity (MWelec)": "19.99", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "East Of Wardlaw Wood Windfarm", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 5HR", "X-coordinate": "227179", "Y-coordinate": "651185", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00593/PP ", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "04/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "07/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "07/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.723168", "long": "-4.753233", "status": "planning", "mw": 19, "ext_id": "14231"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wardlaw Wood Windfarm - Battery Storage", "name_short": "Wardlaw Wood Windfarm", "owner": "Community Windpower Limited", "state": "scotland", "country": "uk", "lat": "55.723168", "long": "-4.753233", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.723168+-4.753233", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Houston Solar PV Farm & Energy Storage Facility", "city": "", "id": "1223", "external_id": "14294", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "The Old Rectory", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1223", "external_id": "14294", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Houston Solar PV Farm & Energy Storage Facility", "external_id": "14294", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "The Old Rectory", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.867636", "long": "-4.550194", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14294", "Record Last Updated (dd/mm/yyyy)": "14/12/2023", "Operator (or Applicant)": "The Old Rectory", "Site Name": "Houston Solar PV Farm & Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14293", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Houston Village Hall, 19 Main Street, Houston, Johnstone", "County": "Renfrewshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA6 7EL", "X-coordinate": "240520", "Y-coordinate": "666770", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004825", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.867636", "long": "-4.550194", "status": "planning", "mw": 25, "ext_id": "14294"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14294", "Record Last Updated (dd/mm/yyyy)": "14/12/2023", "Operator (or Applicant)": "The Old Rectory", "Site Name": "Houston Solar PV Farm & Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14293", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Houston Village Hall, 19 Main Street, Houston, Johnstone", "County": "Renfrewshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA6 7EL", "X-coordinate": "240520", "Y-coordinate": "666770", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004825", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.867636", "long": "-4.550194", "status": "planning", "mw": 25, "ext_id": "14294"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Houston Solar PV Farm & Energy Storage Facility", "name_short": "Houston Solar PV Farm & Energy", "owner": "The Old Rectory", "state": "scotland", "country": "uk", "lat": "55.867636", "long": "-4.550194", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.867636+-4.550194", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Knockodhar Wind Farm", "city": "", "id": "1224", "external_id": "14296", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "REG Knockodhar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1224", "external_id": "14296", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Knockodhar Wind Farm", "external_id": "14296", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "REG Knockodhar Limited", "status": "planning", "date_first_heard": "2023-07-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.210802", "long": "-4.71116", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14296", "Record Last Updated (dd/mm/yyyy)": "14/07/2023", "Operator (or Applicant)": "REG Knockodhar Limited", "Site Name": "Knockodhar Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14295", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Knockodhar Wind Farm, 3.5 kilometres SW/O The Village Of Barr, Girvan", "County": "South Ayrshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26 9TW", "X-coordinate": "227597", "Y-coordinate": "594082", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002153", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.210802", "long": "-4.71116", "status": "planning", "mw": 20, "ext_id": "14296"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14296", "Record Last Updated (dd/mm/yyyy)": "14/07/2023", "Operator (or Applicant)": "REG Knockodhar Limited", "Site Name": "Knockodhar Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14295", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Knockodhar Wind Farm, 3.5 kilometres SW/O The Village Of Barr, Girvan", "County": "South Ayrshire ", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA26 9TW", "X-coordinate": "227597", "Y-coordinate": "594082", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00002153", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.210802", "long": "-4.71116", "status": "planning", "mw": 20, "ext_id": "14296"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-07-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Knockodhar Wind Farm", "name_short": "Knockodhar Wind Farm", "owner": "REG Knockodhar Limited", "state": "scotland", "country": "uk", "lat": "55.210802", "long": "-4.71116", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.210802+-4.71116", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Grendon Lakes, Grendon - Battery Storage Facility", "city": "", "id": "1225", "external_id": "14321", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1225", "external_id": "14321", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Grendon Lakes, Grendon - Battery Storage Facility", "external_id": "14321", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2023-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.244024", "long": "-0.722824", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14321", "Record Last Updated (dd/mm/yyyy)": "19/07/2023", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes, Grendon - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10955", "Address": "Grendon Lakes, Main Road, Grendon, Northampton", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW", "X-coordinate": "487299", "Y-coordinate": "261417", "Planning Authority": "Wellingborough Borough Council", "Planning Application Reference": "NW/23/00360/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.244024", "long": "-0.722824", "status": "planning", "mw": 49, "ext_id": "14321"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14321", "Record Last Updated (dd/mm/yyyy)": "19/07/2023", "Operator (or Applicant)": "Statera Energy", "Site Name": "Grendon Lakes, Grendon - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10955", "Address": "Grendon Lakes, Main Road, Grendon, Northampton", "County": "Northamptonshire", "Region": "East Midlands", "Country": "England", "Post Code": "NN7 1JW", "X-coordinate": "487299", "Y-coordinate": "261417", "Planning Authority": "Wellingborough Borough Council", "Planning Application Reference": "NW/23/00360/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.244024", "long": "-0.722824", "status": "planning", "mw": 49, "ext_id": "14321"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Grendon Lakes, Grendon - Battery Storage Facility", "name_short": "Grendon Lakes, Grendon", "owner": "Statera Energy", "state": "east midlands", "country": "uk", "lat": "52.244024", "long": "-0.722824", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.244024+-0.722824", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Denfield Farm", "city": "", "id": "1226", "external_id": "14341", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Seahills Properties Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1226", "external_id": "14341", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Denfield Farm", "external_id": "14341", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Seahills Properties Limited", "status": "planning", "date_first_heard": "2024-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.565491", "long": "-2.619013", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14341", "Record Last Updated (dd/mm/yyyy)": "10/01/2024", "Operator (or Applicant)": "Seahills Properties Limited", "Site Name": "Denfield Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7163", "Address": "Land To East Of Crudie Acre Co, Arbroath, Tayside", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD11 3ET", "X-coordinate": "362057", "Y-coordinate": "741675", "Planning Authority": "Angus Council", "Planning Application Reference": "23/00285/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2024", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.565491", "long": "-2.619013", "status": "planning", "mw": 20, "ext_id": "14341"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14341", "Record Last Updated (dd/mm/yyyy)": "10/01/2024", "Operator (or Applicant)": "Seahills Properties Limited", "Site Name": "Denfield Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7163", "Address": "Land To East Of Crudie Acre Co, Arbroath, Tayside", "County": "Angus", "Region": "Scotland", "Country": "Scotland", "Post Code": "DD11 3ET", "X-coordinate": "362057", "Y-coordinate": "741675", "Planning Authority": "Angus Council", "Planning Application Reference": "23/00285/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/01/2024", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/01/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.565491", "long": "-2.619013", "status": "planning", "mw": 20, "ext_id": "14341"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2024-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Denfield Farm", "name_short": "Denfield Farm", "owner": "Seahills Properties Limited", "state": "scotland", "country": "uk", "lat": "56.565491", "long": "-2.619013", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.565491+-2.619013", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bywater, Kippax - Battery Energy Storage", "city": "", "id": "1227", "external_id": "14362", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Barnsdale Solar Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1227", "external_id": "14362", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bywater, Kippax - Battery Energy Storage", "external_id": "14362", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Barnsdale Solar Park Limited", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.750604", "long": "-1.360494", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14362", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "Barnsdale Solar Park Limited", "Site Name": "Bywater, Kippax - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bywater To The W/O The A656 The N/O Allerton Bywater, S/O Kippax, Leeds", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF10 2FX", "X-coordinate": "442268", "Y-coordinate": "428438", "Planning Authority": "Leeds City Council", "Planning Application Reference": "23/03233/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.750604", "long": "-1.360494", "status": "planning", "mw": 40, "ext_id": "14362"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14362", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "Barnsdale Solar Park Limited", "Site Name": "Bywater, Kippax - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bywater To The W/O The A656 The N/O Allerton Bywater, S/O Kippax, Leeds", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF10 2FX", "X-coordinate": "442268", "Y-coordinate": "428438", "Planning Authority": "Leeds City Council", "Planning Application Reference": "23/03233/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.750604", "long": "-1.360494", "status": "planning", "mw": 40, "ext_id": "14362"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bywater, Kippax - Battery Energy Storage", "name_short": "Bywater, Kippax", "owner": "Barnsdale Solar Park Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.750604", "long": "-1.360494", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.750604+-1.360494", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "city": "", "id": "1228", "external_id": "14373", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1228", "external_id": "14373", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "external_id": "14373", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Whirlwind Renewables", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.469701", "long": "-4.507613", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14373", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": "8248", "Address": "SW Of Platchaig House Kilmorack Beauly", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV4 7AL", "X-coordinate": "249707", "Y-coordinate": "844935", "Planning Authority": "Highland Council", "Planning Application Reference": "23/03113/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.469701", "long": "-4.507613", "status": "planning", "mw": 49, "ext_id": "14373"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14373", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "Whirlwind Renewables", "Site Name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": "8248", "Address": "SW Of Platchaig House Kilmorack Beauly", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV4 7AL", "X-coordinate": "249707", "Y-coordinate": "844935", "Planning Authority": "Highland Council", "Planning Application Reference": "23/03113/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "29/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.469701", "long": "-4.507613", "status": "planning", "mw": 49, "ext_id": "14373"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "name_short": "Caulternich Croft Energy Storage Pr...", "owner": "Whirlwind Renewables", "state": "scotland", "country": "uk", "lat": "57.469701", "long": "-4.507613", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.469701+-4.507613", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kintore Substation, Leylodge - Battery Energy Storage", "city": "", "id": "1229", "external_id": "14374", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "XRE Gamma Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1229", "external_id": "14374", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kintore Substation, Leylodge - Battery Energy Storage", "external_id": "14374", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "XRE Gamma Limited", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.218628", "long": "-2.375657", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14374", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "XRE Gamma Limited", "Site Name": "Kintore Substation, Leylodge - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The E/O Kintore Substation, Leylodge, Kintore, Inverurie", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XY", "X-coordinate": "377412", "Y-coordinate": "814271", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/1234", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.218628", "long": "-2.375657", "status": "planning", "mw": 49, "ext_id": "14374"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14374", "Record Last Updated (dd/mm/yyyy)": "24/07/2023", "Operator (or Applicant)": "XRE Gamma Limited", "Site Name": "Kintore Substation, Leylodge - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The E/O Kintore Substation, Leylodge, Kintore, Inverurie", "County": "Aberdeenshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB51 0XY", "X-coordinate": "377412", "Y-coordinate": "814271", "Planning Authority": "Aberdeenshire Council", "Planning Application Reference": "APP/2023/1234", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.218628", "long": "-2.375657", "status": "planning", "mw": 49, "ext_id": "14374"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kintore Substation, Leylodge - Battery Energy Storage", "name_short": "Kintore Substation, Leylodge", "owner": "XRE Gamma Limited", "state": "scotland", "country": "uk", "lat": "57.218628", "long": "-2.375657", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.218628+-2.375657", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Seath Road, Rutherglen - Battery Storage", "city": "", "id": "1230", "external_id": "14378", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1230", "external_id": "14378", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Seath Road, Rutherglen - Battery Storage", "external_id": "14378", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Green Power Consultants", "status": "planning", "date_first_heard": "2023-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.833638", "long": "-4.217595", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14378", "Record Last Updated (dd/mm/yyyy)": "12/10/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Seath Road, Rutherglen - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "50", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Southeast Side of Seath Road Rutherglen", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G73 1RW", "X-coordinate": "261207", "Y-coordinate": "662270", "Planning Authority": "South Lanarkshire council", "Planning Application Reference": "P/23/1214", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "21/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.833638", "long": "-4.217595", "status": "planning", "mw": 50, "ext_id": "14378"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14378", "Record Last Updated (dd/mm/yyyy)": "12/10/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Seath Road, Rutherglen - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "50", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Southeast Side of Seath Road Rutherglen", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G73 1RW", "X-coordinate": "261207", "Y-coordinate": "662270", "Planning Authority": "South Lanarkshire council", "Planning Application Reference": "P/23/1214", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "21/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.833638", "long": "-4.217595", "status": "planning", "mw": 50, "ext_id": "14378"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Seath Road, Rutherglen - Battery Storage", "name_short": "Seath Road, Rutherglen", "owner": "Green Power Consultants", "state": "scotland", "country": "uk", "lat": "55.833638", "long": "-4.217595", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.833638+-4.217595", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fanny House Farm, Bay Gateway - Battery Storage", "city": "", "id": "1231", "external_id": "14386", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "940", "power_mw": "940", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1231", "external_id": "14386", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fanny House Farm, Bay Gateway - Battery Storage", "external_id": "14386", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 940, "power_mw": 940, "owner": "Innova Renewables", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.051855", "long": "-2.878072", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14386", "Record Last Updated (dd/mm/yyyy)": "01/12/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "Fanny House Farm, Bay Gateway - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "940", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fanny House Farm, Heaton With Oxcliffe, Morcambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3EF", "X-coordinate": "342611", "Y-coordinate": "462123", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "23/00749/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/11/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.051855", "long": "-2.878072", "status": "planning", "mw": 940, "ext_id": "14386"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14386", "Record Last Updated (dd/mm/yyyy)": "01/12/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "Fanny House Farm, Bay Gateway - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "940", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Fanny House Farm, Heaton With Oxcliffe, Morcambe", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "LA3 3EF", "X-coordinate": "342611", "Y-coordinate": "462123", "Planning Authority": "Lancaster City Council", "Planning Application Reference": "23/00749/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "30/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/11/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/11/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.051855", "long": "-2.878072", "status": "planning", "mw": 940, "ext_id": "14386"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 940, "mwh_is_estimate": true, "mwh": 940, "mwh_estimate": 940, "status": "planning", "status_class": "", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fanny House Farm, Bay Gateway - Battery Storage", "name_short": "Fanny House Farm, Bay Gateway", "owner": "Innova Renewables", "state": "north west", "country": "uk", "lat": "54.051855", "long": "-2.878072", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.051855+-2.878072", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "West Boldon Substation - Battery Energy Storage", "city": "", "id": "1232", "external_id": "14408", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1232", "external_id": "14408", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "West Boldon Substation - Battery Energy Storage", "external_id": "14408", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Whirlwind Energy Storage Limited", "status": "planning", "date_first_heard": "2023-07-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.938936", "long": "-1.467373", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14408", "Record Last Updated (dd/mm/yyyy)": "26/07/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "West Boldon Substation - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East of the West Boldon Substation, 400 metres south of the A184 and 300m East of the A189 in South Tyneside ", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE35 9PE", "X-coordinate": "434222", "Y-coordinate": "560604", "Planning Authority": "South Tyneside Council", "Planning Application Reference": "ST/0486/23/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.938936", "long": "-1.467373", "status": "planning", "mw": 60, "ext_id": "14408"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14408", "Record Last Updated (dd/mm/yyyy)": "26/07/2023", "Operator (or Applicant)": "Whirlwind Energy Storage Limited", "Site Name": "West Boldon Substation - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East of the West Boldon Substation, 400 metres south of the A184 and 300m East of the A189 in South Tyneside ", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "NE35 9PE", "X-coordinate": "434222", "Y-coordinate": "560604", "Planning Authority": "South Tyneside Council", "Planning Application Reference": "ST/0486/23/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.938936", "long": "-1.467373", "status": "planning", "mw": 60, "ext_id": "14408"}, "current_month": "2024-01", "dates": {"first_heard": "2023-07-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-07-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "West Boldon Substation - Battery Energy Storage", "name_short": "West Boldon Substation", "owner": "Whirlwind Energy Storage Limited", "state": "north east", "country": "uk", "lat": "54.938936", "long": "-1.467373", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.938936+-1.467373", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "city": "", "id": "1233", "external_id": "14461", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Connections Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1233", "external_id": "14461", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "external_id": "14461", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Renewable Connections Development Limited", "status": "planning", "date_first_heard": "2023-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.394089", "long": "-4.899253", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14461", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Renewable Connections Development Limited", "Site Name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10058", "Address": "Indian Queens Sub-station, B3279 From Gaverigan To Carne Hill, St Dennis, St Austell", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194029", "Y-coordinate": "58931", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/04504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.394089", "long": "-4.899253", "status": "planning", "mw": 50, "ext_id": "14461"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14461", "Record Last Updated (dd/mm/yyyy)": "08/01/2024", "Operator (or Applicant)": "Renewable Connections Development Limited", "Site Name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10058", "Address": "Indian Queens Sub-station, B3279 From Gaverigan To Carne Hill, St Dennis, St Austell", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "194029", "Y-coordinate": "58931", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/04504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "22/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "22/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.394089", "long": "-4.899253", "status": "planning", "mw": 50, "ext_id": "14461"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "name_short": "Indian Queens Sub station, Carne Hi...", "owner": "Renewable Connections Development Limited", "state": "south west", "country": "uk", "lat": "50.394089", "long": "-4.899253", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.394089+-4.899253", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ebstree Road, Trysull - Battery Energy Storage", "city": "", "id": "1234", "external_id": "14497", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Bengrove Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1234", "external_id": "14497", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ebstree Road, Trysull - Battery Energy Storage", "external_id": "14497", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Bengrove Bess Limited", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.559161", "long": "-2.222366", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14497", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Bengrove Bess Limited", "Site Name": "Ebstree Road, Trysull - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Ebstree Road Trysull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV5 7JE", "X-coordinate": "385022", "Y-coordinate": "295726", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00980/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.559161", "long": "-2.222366", "status": "planning", "mw": 49, "ext_id": "14497"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14497", "Record Last Updated (dd/mm/yyyy)": "11/01/2024", "Operator (or Applicant)": "Bengrove Bess Limited", "Site Name": "Ebstree Road, Trysull - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Ebstree Road Trysull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV5 7JE", "X-coordinate": "385022", "Y-coordinate": "295726", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00980/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.559161", "long": "-2.222366", "status": "planning", "mw": 49, "ext_id": "14497"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ebstree Road, Trysull - Battery Energy Storage", "name_short": "Ebstree Road, Trysull", "owner": "Bengrove Bess Limited", "state": "west midlands", "country": "uk", "lat": "52.559161", "long": "-2.222366", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.559161+-2.222366", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "1235", "external_id": "14510", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo ES Berkswell Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1235", "external_id": "14510", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "external_id": "14510", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anglo ES Berkswell Limited", "status": "planning", "date_first_heard": "2023-08-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.389808", "long": "-1.615984", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14510", "Record Last Updated (dd/mm/yyyy)": "07/08/2023", "Operator (or Applicant)": "Anglo ES Berkswell Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hodgetts Lane Berkswell ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426231", "Y-coordinate": "276934", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2023/01595/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.389808", "long": "-1.615984", "status": "planning", "mw": 49, "ext_id": "14510"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14510", "Record Last Updated (dd/mm/yyyy)": "07/08/2023", "Operator (or Applicant)": "Anglo ES Berkswell Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hodgetts Lane Berkswell ", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426231", "Y-coordinate": "276934", "Planning Authority": "Solihull Council", "Planning Application Reference": "PL/2023/01595/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.389808", "long": "-1.615984", "status": "planning", "mw": 49, "ext_id": "14510"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-08-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "name_short": "Hodgetts Lane, Berkswell - Electric...", "owner": "Anglo ES Berkswell Limited", "state": "west midlands", "country": "uk", "lat": "52.389808", "long": "-1.615984", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.389808+-1.615984", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Meiklelaught Farm - Battery Storage", "city": "", "id": "1236", "external_id": "14525", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1236", "external_id": "14525", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Meiklelaught Farm - Battery Storage", "external_id": "14525", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Green Power Consultants", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.667584", "long": "-4.76865", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14525", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Meiklelaught Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Meiklelaught Farm, Saltcoats", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA21 6NF", "X-coordinate": "225964", "Y-coordinate": "645040", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00731/PPM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.667584", "long": "-4.76865", "status": "planning", "mw": 30, "ext_id": "14525"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14525", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Green Power Consultants", "Site Name": "Meiklelaught Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Meiklelaught Farm, Saltcoats", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA21 6NF", "X-coordinate": "225964", "Y-coordinate": "645040", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00731/PPM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "13/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.667584", "long": "-4.76865", "status": "planning", "mw": 30, "ext_id": "14525"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Meiklelaught Farm - Battery Storage", "name_short": "Meiklelaught Farm", "owner": "Green Power Consultants", "state": "scotland", "country": "uk", "lat": "55.667584", "long": "-4.76865", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.667584+-4.76865", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dunside Wind Farm", "city": "", "id": "1237", "external_id": "14531", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1237", "external_id": "14531", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dunside Wind Farm", "external_id": "14531", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "EDF Energy", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.815517", "long": "-2.563469", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14531", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "EDF Energy", "Site Name": "Dunside Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10865", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Dunside Longformacus Duns ", "County": "Scottish Borders ", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD11 3PF", "X-coordinate": "364788", "Y-coordinate": "658172", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003436", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.815517", "long": "-2.563469", "status": "planning", "mw": 20, "ext_id": "14531"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14531", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "EDF Energy", "Site Name": "Dunside Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10865", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Dunside Longformacus Duns ", "County": "Scottish Borders ", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD11 3PF", "X-coordinate": "364788", "Y-coordinate": "658172", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003436", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.815517", "long": "-2.563469", "status": "planning", "mw": 20, "ext_id": "14531"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dunside Wind Farm", "name_short": "Dunside Wind Farm", "owner": "EDF Energy", "state": "scotland", "country": "uk", "lat": "55.815517", "long": "-2.563469", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.815517+-2.563469", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Bodinglee Wind Farm", "city": "", "id": "1238", "external_id": "14532", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "106", "power_mw": "106", "customer": "", "owner": "Banks Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1238", "external_id": "14532", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Bodinglee Wind Farm", "external_id": "14532", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 106, "power_mw": 106, "owner": "Banks Group", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.533406", "long": "-3.826254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14532", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Banks Group", "Site Name": "Bodinglee Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13638", "Installed Capacity (MWelec)": "106", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bodinglee Road, Wiston, Biggar", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML12 6HU", "X-coordinate": "284834", "Y-coordinate": "628146", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004839", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.533406", "long": "-3.826254", "status": "planning", "mw": 106, "ext_id": "14532"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14532", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Banks Group", "Site Name": "Bodinglee Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "13638", "Installed Capacity (MWelec)": "106", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Bodinglee Road, Wiston, Biggar", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML12 6HU", "X-coordinate": "284834", "Y-coordinate": "628146", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004839", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "22/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.533406", "long": "-3.826254", "status": "planning", "mw": 106, "ext_id": "14532"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 106, "mwh_is_estimate": true, "mwh": 106, "mwh_estimate": 106, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Bodinglee Wind Farm", "name_short": "Bodinglee Wind Farm", "owner": "Banks Group", "state": "scotland", "country": "uk", "lat": "55.533406", "long": "-3.826254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.533406+-3.826254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rivox Wind Farm - Wind farm", "city": "", "id": "1239", "external_id": "14533", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1239", "external_id": "14533", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rivox Wind Farm - Wind farm", "external_id": "14533", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 90, "power_mw": 90, "owner": "Belltown Power Limited", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.384388", "long": "-3.760322", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14533", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Rivox Wind Farm - Wind farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9317", "Installed Capacity (MWelec)": "90", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rivox Wind Farm Lowther Hills West Of Moffat", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "288575", "Y-coordinate": "611457", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003293", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.384388", "long": "-3.760322", "status": "planning", "mw": 90, "ext_id": "14533"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14533", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Rivox Wind Farm - Wind farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9317", "Installed Capacity (MWelec)": "90", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rivox Wind Farm Lowther Hills West Of Moffat", "County": "South Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG10", "X-coordinate": "288575", "Y-coordinate": "611457", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003293", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.384388", "long": "-3.760322", "status": "planning", "mw": 90, "ext_id": "14533"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 90, "mwh_is_estimate": true, "mwh": 90, "mwh_estimate": 90, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rivox Wind Farm - Wind farm", "name_short": "Rivox Wind Farm - Wind farm", "owner": "Belltown Power Limited", "state": "scotland", "country": "uk", "lat": "55.384388", "long": "-3.760322", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.384388+-3.760322", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "city": "", "id": "1240", "external_id": "14597", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1240", "external_id": "14597", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "external_id": "14597", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 57, "power_mw": 57, "owner": "Shaw-Energi Limited", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.619161", "long": "-2.216007", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14597", "Record Last Updated (dd/mm/yyyy)": "18/08/2023", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "57", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": "12187", "Address": "The Rake, Lower Jowkin Lane & Furbarn Road, Rochdale", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 5QR", "X-coordinate": "385809", "Y-coordinate": "413646", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "23/00816/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "25/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.619161", "long": "-2.216007", "status": "planning", "mw": 57, "ext_id": "14597"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14597", "Record Last Updated (dd/mm/yyyy)": "18/08/2023", "Operator (or Applicant)": "Shaw-Energi Limited", "Site Name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "57", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": "12187", "Address": "The Rake, Lower Jowkin Lane & Furbarn Road, Rochdale", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "OL11 5QR", "X-coordinate": "385809", "Y-coordinate": "413646", "Planning Authority": "Rochdale Metropolitan Borough Council", "Planning Application Reference": "23/00816/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "25/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.619161", "long": "-2.216007", "status": "planning", "mw": 57, "ext_id": "14597"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 57, "mwh_is_estimate": true, "mwh": 57, "mwh_estimate": 57, "status": "planning", "status_class": "", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "name_short": "The Rake, Lower Jowkin Lane", "owner": "Shaw-Energi Limited", "state": "north west", "country": "uk", "lat": "53.619161", "long": "-2.216007", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.619161+-2.216007", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Walshaw House, Regent Street - Battery Energy Storage", "city": "", "id": "1241", "external_id": "14625", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "R B Business Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1241", "external_id": "14625", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Walshaw House, Regent Street - Battery Energy Storage", "external_id": "14625", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "R B Business Park Limited", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.849027", "long": "-2.20275", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14625", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "R B Business Park Limited", "Site Name": "Walshaw House, Regent Street - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Walshaw House, Regent Street, Nelson", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB9 8AS", "X-coordinate": "386759", "Y-coordinate": "439218", "Planning Authority": "Pendle Borough Council", "Planning Application Reference": "23/0541/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.849027", "long": "-2.20275", "status": "planning", "mw": 100, "ext_id": "14625"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14625", "Record Last Updated (dd/mm/yyyy)": "02/01/2024", "Operator (or Applicant)": "R B Business Park Limited", "Site Name": "Walshaw House, Regent Street - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Walshaw House, Regent Street, Nelson", "County": "Lancashire", "Region": "North West", "Country": "England", "Post Code": "BB9 8AS", "X-coordinate": "386759", "Y-coordinate": "439218", "Planning Authority": "Pendle Borough Council", "Planning Application Reference": "23/0541/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.849027", "long": "-2.20275", "status": "planning", "mw": 100, "ext_id": "14625"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Walshaw House, Regent Street - Battery Energy Storage", "name_short": "Walshaw House, Regent Street", "owner": "R B Business Park Limited", "state": "north west", "country": "uk", "lat": "53.849027", "long": "-2.20275", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.849027+-2.20275", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "city": "", "id": "1242", "external_id": "14638", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Chiltern Renewables Hockliffe Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1242", "external_id": "14638", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "external_id": "14638", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Chiltern Renewables Hockliffe Limited", "status": "planning", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.660315", "long": "-0.342571", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14638", "Record Last Updated (dd/mm/yyyy)": "05/12/2023", "Operator (or Applicant)": "Chiltern Renewables Hockliffe Limited", "Site Name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Elstree Substation, Hilfield Lane, Aldenham", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "WD25 8DT", "X-coordinate": "514739", "Y-coordinate": "197026", "Planning Authority": "Hertsmere Council", "Planning Application Reference": "23/1508/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.660315", "long": "-0.342571", "status": "planning", "mw": 400, "ext_id": "14638"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14638", "Record Last Updated (dd/mm/yyyy)": "05/12/2023", "Operator (or Applicant)": "Chiltern Renewables Hockliffe Limited", "Site Name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Elstree Substation, Hilfield Lane, Aldenham", "County": "Hertfordshire", "Region": "Eastern", "Country": "England", "Post Code": "WD25 8DT", "X-coordinate": "514739", "Y-coordinate": "197026", "Planning Authority": "Hertsmere Council", "Planning Application Reference": "23/1508/OUT", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.660315", "long": "-0.342571", "status": "planning", "mw": 400, "ext_id": "14638"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "name_short": "Elstree Substation, Hilfield Lane", "owner": "Chiltern Renewables Hockliffe Limited", "state": "eastern", "country": "uk", "lat": "51.660315", "long": "-0.342571", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.660315+-0.342571", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "New Barn Road - Battery Energy Storage Facility", "city": "", "id": "1243", "external_id": "14650", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Aton Energy Development (Northfleet) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1243", "external_id": "14650", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "New Barn Road - Battery Energy Storage Facility", "external_id": "14650", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Aton Energy Development (Northfleet) Limited", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.4208", "long": "0.311498", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14650", "Record Last Updated (dd/mm/yyyy)": "29/08/2023", "Operator (or Applicant)": "Aton Energy Development (Northfleet) Limited", "Site Name": "New Barn Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Side Of New Barn Road, Gravesend", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "DA13 9PA", "X-coordinate": "560817", "Y-coordinate": "171622", "Planning Authority": "Dartford Borough Council", "Planning Application Reference": "23/00863/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.4208", "long": "0.311498", "status": "planning", "mw": 35, "ext_id": "14650"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14650", "Record Last Updated (dd/mm/yyyy)": "29/08/2023", "Operator (or Applicant)": "Aton Energy Development (Northfleet) Limited", "Site Name": "New Barn Road - Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "East Side Of New Barn Road, Gravesend", "County": "Kent", "Region": "South East", "Country": "England", "Post Code": "DA13 9PA", "X-coordinate": "560817", "Y-coordinate": "171622", "Planning Authority": "Dartford Borough Council", "Planning Application Reference": "23/00863/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.4208", "long": "0.311498", "status": "planning", "mw": 35, "ext_id": "14650"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "New Barn Road - Battery Energy Storage Facility", "name_short": "New Barn Road - Battery Energy", "owner": "Aton Energy Development (Northfleet) Limited", "state": "south east", "country": "uk", "lat": "51.4208", "long": "0.311498", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.4208+0.311498", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coopers Lane, Kirkby - Battery Storage Facility", "city": "", "id": "1244", "external_id": "14670", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1244", "external_id": "14670", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coopers Lane, Kirkby - Battery Storage Facility", "external_id": "14670", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pelagic Energy", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.467913", "long": "-2.850394", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14670", "Record Last Updated (dd/mm/yyyy)": "29/08/2023", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Coopers Lane, Kirkby - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coopers Lane, Kirkby, Liverpool", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L33 7TT", "X-coordinate": "343645", "Y-coordinate": "397134", "Planning Authority": "Knowsley Metropolitan Borough Council", "Planning Application Reference": "23/02008/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.467913", "long": "-2.850394", "status": "planning", "mw": 49, "ext_id": "14670"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14670", "Record Last Updated (dd/mm/yyyy)": "29/08/2023", "Operator (or Applicant)": "Pelagic Energy", "Site Name": "Coopers Lane, Kirkby - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coopers Lane, Kirkby, Liverpool", "County": "Merseyside", "Region": "North West", "Country": "England", "Post Code": "L33 7TT", "X-coordinate": "343645", "Y-coordinate": "397134", "Planning Authority": "Knowsley Metropolitan Borough Council", "Planning Application Reference": "23/02008/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.467913", "long": "-2.850394", "status": "planning", "mw": 49, "ext_id": "14670"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coopers Lane, Kirkby - Battery Storage Facility", "name_short": "Coopers Lane, Kirkby", "owner": "Pelagic Energy", "state": "north west", "country": "uk", "lat": "53.467913", "long": "-2.850394", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.467913+-2.850394", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "city": "", "id": "1245", "external_id": "14687", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Renewables (merged with Pivot Power)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1245", "external_id": "14687", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "external_id": "14687", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "EDF Energy Renewables (merged with Pivot Power)", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.396753", "long": "-4.900274", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14687", "Record Last Updated (dd/mm/yyyy)": "01/09/2023", "Operator (or Applicant)": "EDF Energy Renewables (merged with Pivot Power)", "Site Name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10058", "Address": "Indian Queens National Grid Substation Domelick Hill, B3279 St Dennis ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "193968", "Y-coordinate": "59230", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/06527\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.396753", "long": "-4.900274", "status": "planning", "mw": 50, "ext_id": "14687"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14687", "Record Last Updated (dd/mm/yyyy)": "01/09/2023", "Operator (or Applicant)": "EDF Energy Renewables (merged with Pivot Power)", "Site Name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10058", "Address": "Indian Queens National Grid Substation Domelick Hill, B3279 St Dennis ", "County": "Cornwall", "Region": "South West", "Country": "England", "Post Code": "PL26 8BY", "X-coordinate": "193968", "Y-coordinate": "59230", "Planning Authority": "Cornwall Council", "Planning Application Reference": "PA23/06527\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.396753", "long": "-4.900274", "status": "planning", "mw": 50, "ext_id": "14687"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "name_short": "Indian Queens National Grid Substat...", "owner": "EDF Energy Renewables (merged with Pivot Power)", "state": "south west", "country": "uk", "lat": "50.396753", "long": "-4.900274", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.396753+-4.900274", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "city": "", "id": "1246", "external_id": "14691", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1246", "external_id": "14691", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "external_id": "14691", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anglo Renewables", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.565944", "long": "-2.481742", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14691", "Record Last Updated (dd/mm/yyyy)": "01/09/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Between Larks Lane And Latteridge Lane Latteridge ", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TY", "X-coordinate": "366705", "Y-coordinate": "185340", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/02270/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.565944", "long": "-2.481742", "status": "planning", "mw": 49, "ext_id": "14691"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14691", "Record Last Updated (dd/mm/yyyy)": "01/09/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land Between Larks Lane And Latteridge Lane Latteridge ", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS37 9TY", "X-coordinate": "366705", "Y-coordinate": "185340", "Planning Authority": "South Gloucestershire Council", "Planning Application Reference": "P23/02270/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.565944", "long": "-2.481742", "status": "planning", "mw": 49, "ext_id": "14691"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "name_short": "Larks Lane & Latteridge Lane, Latte...", "owner": "Anglo Renewables", "state": "south west", "country": "uk", "lat": "51.565944", "long": "-2.481742", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.565944+-2.481742", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tofts - Battery Storage", "city": "", "id": "1247", "external_id": "14706", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Telford Three Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1247", "external_id": "14706", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tofts - Battery Storage", "external_id": "14706", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Telford Three Limited", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.708996", "long": "-4.711909", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "14706", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "Telford Three Limited", "Site Name": "Tofts - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Site Of Former Bridgend Mill Tofts", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 5AS", "X-coordinate": "229712", "Y-coordinate": "649506", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00396/PPP", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "05/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.708996", "long": "-4.711909", "status": "planning", "mw": 19, "ext_id": "14706"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "14706", "Record Last Updated (dd/mm/yyyy)": "18/09/2023", "Operator (or Applicant)": "Telford Three Limited", "Site Name": "Tofts - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": " ", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Site Of Former Bridgend Mill Tofts", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA24 5AS", "X-coordinate": "229712", "Y-coordinate": "649506", "Planning Authority": "North Ayrshire Council", "Planning Application Reference": "23/00396/PPP", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "05/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "NA", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.708996", "long": "-4.711909", "status": "planning", "mw": 19, "ext_id": "14706"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tofts - Battery Storage", "name_short": "Tofts", "owner": "Telford Three Limited", "state": "scotland", "country": "uk", "lat": "55.708996", "long": "-4.711909", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.708996+-4.711909", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Barlow Road, Barlow Road - Battery Storage", "city": "", "id": "1248", "external_id": "14715", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1248", "external_id": "14715", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Barlow Road, Barlow Road - Battery Storage", "external_id": "14715", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Vox Energy Limited", "status": "planning", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14715", "Record Last Updated (dd/mm/yyyy)": "06/09/2023", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12734", "Address": "Home Farm, Barlow Road, Barlow, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "ZG2023/0720/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 80, "ext_id": "14715"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14715", "Record Last Updated (dd/mm/yyyy)": "06/09/2023", "Operator (or Applicant)": "Vox Energy Limited", "Site Name": "Barlow Road, Barlow Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12734", "Address": "Home Farm, Barlow Road, Barlow, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8FX", "X-coordinate": "462213", "Y-coordinate": "431171", "Planning Authority": "Selby District Council", "Planning Application Reference": "ZG2023/0720/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.773171", "long": "-1.057521", "status": "planning", "mw": 80, "ext_id": "14715"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Barlow Road, Barlow Road - Battery Storage", "name_short": "Barlow Road, Barlow Road", "owner": "Vox Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.773171", "long": "-1.057521", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.773171+-1.057521", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wilton International, Greystones Road - Phase 1", "city": "", "id": "1249", "external_id": "14729", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "Sembcorp Utilities (UK) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1249", "external_id": "14729", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wilton International, Greystones Road - Phase 1", "external_id": "14729", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "Sembcorp Utilities (UK) Limited", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.572705", "long": "-1.129556", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14729", "Record Last Updated (dd/mm/yyyy)": "10/10/2023", "Operator (or Applicant)": "Sembcorp Utilities (UK) Limited", "Site Name": "Wilton International, Greystones Road - Phase 1", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wilton International, Lazenby", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8JH", "X-coordinate": "456370", "Y-coordinate": "520069", "Planning Authority": "Redcar & Cleveland Borough Council", "Planning Application Reference": "R/2023/0545/CL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572705", "long": "-1.129556", "status": "planning", "mw": 150, "ext_id": "14729"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14729", "Record Last Updated (dd/mm/yyyy)": "10/10/2023", "Operator (or Applicant)": "Sembcorp Utilities (UK) Limited", "Site Name": "Wilton International, Greystones Road - Phase 1", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Wilton International, Lazenby", "County": "Cleveland", "Region": "North East", "Country": "England", "Post Code": "TS6 8JH", "X-coordinate": "456370", "Y-coordinate": "520069", "Planning Authority": "Redcar & Cleveland Borough Council", "Planning Application Reference": "R/2023/0545/CL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "04/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "PD", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.572705", "long": "-1.129556", "status": "planning", "mw": 150, "ext_id": "14729"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wilton International, Greystones Road - Phase 1", "name_short": "Wilton International, Greystones Ro...", "owner": "Sembcorp Utilities (UK) Limited", "state": "north east", "country": "uk", "lat": "54.572705", "long": "-1.129556", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.572705+-1.129556", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Murton Way - Battery Energy Storage", "city": "", "id": "1250", "external_id": "14759", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "First Way Solar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1250", "external_id": "14759", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Murton Way - Battery Energy Storage", "external_id": "14759", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "First Way Solar Limited", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.894469", "long": "-0.97122", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14759", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "First Way Solar Limited", "Site Name": "Murton Way - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North W/O Murton Way, York", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO19 6AF", "X-coordinate": "467705", "Y-coordinate": "444745", "Planning Authority": "City of York Council", "Planning Application Reference": "23/02030/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.894469", "long": "-0.97122", "status": "planning", "mw": 100, "ext_id": "14759"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14759", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "First Way Solar Limited", "Site Name": "Murton Way - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North W/O Murton Way, York", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO19 6AF", "X-coordinate": "467705", "Y-coordinate": "444745", "Planning Authority": "City of York Council", "Planning Application Reference": "23/02030/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.894469", "long": "-0.97122", "status": "planning", "mw": 100, "ext_id": "14759"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Murton Way - Battery Energy Storage", "name_short": "Murton Way", "owner": "First Way Solar Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.894469", "long": "-0.97122", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.894469+-0.97122", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newarthill Energy Park", "city": "", "id": "1251", "external_id": "14763", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Geocore Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1251", "external_id": "14763", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newarthill Energy Park", "external_id": "14763", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 300, "power_mw": 300, "owner": "Geocore Limited", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.825376", "long": "-3.94311", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14763", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Geocore Limited", "Site Name": "Newarthill Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Legbrannock Road, Newarthill", "County": "Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML1 5SZ", "X-coordinate": "278370", "Y-coordinate": "660834", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004953", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.825376", "long": "-3.94311", "status": "planning", "mw": 300, "ext_id": "14763"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14763", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Geocore Limited", "Site Name": "Newarthill Energy Park", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "300", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Legbrannock Road, Newarthill", "County": "Lanarkshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML1 5SZ", "X-coordinate": "278370", "Y-coordinate": "660834", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004953", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.825376", "long": "-3.94311", "status": "planning", "mw": 300, "ext_id": "14763"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 300, "mwh_is_estimate": true, "mwh": 300, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newarthill Energy Park", "name_short": "Newarthill Energy Park", "owner": "Geocore Limited", "state": "scotland", "country": "uk", "lat": "55.825376", "long": "-3.94311", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.825376+-3.94311", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kingston Road, Slimbridge - Battery Storage", "city": "", "id": "1252", "external_id": "14882", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Relay Slimbridge Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1252", "external_id": "14882", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kingston Road, Slimbridge - Battery Storage", "external_id": "14882", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 36, "power_mw": 36, "owner": "Relay Slimbridge Limited", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.736112", "long": "-2.384789", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14882", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "Relay Slimbridge Limited", "Site Name": "Kingston Road, Slimbridge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "11516", "Address": "Land North East Of Kingston Road Slimbridge \n", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7BN", "X-coordinate": "373525", "Y-coordinate": "204226", "Planning Authority": "Stroud Council", "Planning Application Reference": "S.23/1593/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.736112", "long": "-2.384789", "status": "planning", "mw": 36, "ext_id": "14882"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14882", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "Relay Slimbridge Limited", "Site Name": "Kingston Road, Slimbridge - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "36", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "11516", "Address": "Land North East Of Kingston Road Slimbridge \n", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL2 7BN", "X-coordinate": "373525", "Y-coordinate": "204226", "Planning Authority": "Stroud Council", "Planning Application Reference": "S.23/1593/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.736112", "long": "-2.384789", "status": "planning", "mw": 36, "ext_id": "14882"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 36, "mwh_is_estimate": true, "mwh": 36, "mwh_estimate": 36, "status": "planning", "status_class": "", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kingston Road, Slimbridge - Battery Storage", "name_short": "Kingston Road, Slimbridge", "owner": "Relay Slimbridge Limited", "state": "south west", "country": "uk", "lat": "51.736112", "long": "-2.384789", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.736112+-2.384789", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wallerscote Limebeds - Battery Energy Storage", "city": "", "id": "1253", "external_id": "14888", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Infinis Solar Developments Limited / Green Earth Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1253", "external_id": "14888", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wallerscote Limebeds - Battery Energy Storage", "external_id": "14888", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Infinis Solar Developments Limited / Green Earth Developments", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.258296", "long": "-2.539917", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14888", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "Infinis Solar Developments Limited / Green Earth Developments", "Site Name": "Wallerscote Limebeds - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14887", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Winnington Avenue, Northwich", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW8 4ZE", "X-coordinate": "364079", "Y-coordinate": "373613", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "23/02766/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.258296", "long": "-2.539917", "status": "planning", "mw": 30, "ext_id": "14888"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14888", "Record Last Updated (dd/mm/yyyy)": "26/09/2023", "Operator (or Applicant)": "Infinis Solar Developments Limited / Green Earth Developments", "Site Name": "Wallerscote Limebeds - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "14887", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Winnington Avenue, Northwich", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "CW8 4ZE", "X-coordinate": "364079", "Y-coordinate": "373613", "Planning Authority": "Cheshire West and Chester Council", "Planning Application Reference": "23/02766/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.258296", "long": "-2.539917", "status": "planning", "mw": 30, "ext_id": "14888"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-26", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wallerscote Limebeds - Battery Energy Storage", "name_short": "Wallerscote Limebeds", "owner": "Infinis Solar Developments Limited / Green Earth Developments", "state": "north west", "country": "uk", "lat": "53.258296", "long": "-2.539917", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.258296+-2.539917", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Orrell Street Battery Energy Storage Facility", "city": "", "id": "1254", "external_id": "14892", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Enzygo Limited Environmental Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1254", "external_id": "14892", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Orrell Street Battery Energy Storage Facility", "external_id": "14892", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Enzygo Limited Environmental Consultants", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.541062", "long": "-2.624739", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14892", "Record Last Updated (dd/mm/yyyy)": "27/09/2023", "Operator (or Applicant)": "Enzygo Limited Environmental Consultants", "Site Name": "Orrell Street Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7724", "Address": "Site Of Former Council Depot Orrell Street ", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "WN1 3AB", "X-coordinate": "358696", "Y-coordinate": "405117", "Planning Authority": "Wigan Council", "Planning Application Reference": "A/23/95931/MAJOR", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.541062", "long": "-2.624739", "status": "planning", "mw": 50, "ext_id": "14892"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14892", "Record Last Updated (dd/mm/yyyy)": "27/09/2023", "Operator (or Applicant)": "Enzygo Limited Environmental Consultants", "Site Name": "Orrell Street Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7724", "Address": "Site Of Former Council Depot Orrell Street ", "County": "Greater Manchester", "Region": "North West", "Country": "England", "Post Code": "WN1 3AB", "X-coordinate": "358696", "Y-coordinate": "405117", "Planning Authority": "Wigan Council", "Planning Application Reference": "A/23/95931/MAJOR", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.541062", "long": "-2.624739", "status": "planning", "mw": 50, "ext_id": "14892"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-27", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Orrell Street Battery Energy Storage Facility", "name_short": "Orrell Street Battery Energy", "owner": "Enzygo Limited Environmental Consultants", "state": "north west", "country": "uk", "lat": "53.541062", "long": "-2.624739", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.541062+-2.624739", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "city": "", "id": "1255", "external_id": "14932", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "180", "power_mw": "180", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1255", "external_id": "14932", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "external_id": "14932", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 180, "power_mw": 180, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.566834", "long": "-1.109661", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14932", "Record Last Updated (dd/mm/yyyy)": "02/10/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "180", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Fordstead Lane Almholme Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN5 0LN", "X-coordinate": "459064", "Y-coordinate": "408171", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/01746/FULM\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.566834", "long": "-1.109661", "status": "planning", "mw": 180, "ext_id": "14932"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14932", "Record Last Updated (dd/mm/yyyy)": "02/10/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "180", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Fordstead Lane Almholme Doncaster", "County": "South Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN5 0LN", "X-coordinate": "459064", "Y-coordinate": "408171", "Planning Authority": "City of Doncaster Council", "Planning Application Reference": "23/01746/FULM\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.566834", "long": "-1.109661", "status": "planning", "mw": 180, "ext_id": "14932"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 180, "mwh_is_estimate": true, "mwh": 180, "mwh_estimate": 180, "status": "planning", "status_class": "", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "name_short": "Fordtead Lane, Thorpe Marsh - Batte...", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.566834", "long": "-1.109661", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.566834+-1.109661", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Junction 27, Westleigh - Battery Storage", "city": "", "id": "1256", "external_id": "14935", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Clearstone Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1256", "external_id": "14935", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Junction 27, Westleigh - Battery Storage", "external_id": "14935", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Clearstone Energy", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.942355", "long": "-3.351226", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14935", "Record Last Updated (dd/mm/yyyy)": "02/10/2023", "Operator (or Applicant)": "Clearstone Energy", "Site Name": "Junction 27, Westleigh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North of A361, Junction 27 Westleigh", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX16 7ES", "X-coordinate": "305163", "Y-coordinate": "116749", "Planning Authority": "Mid Devon District Council", "Planning Application Reference": "23/01351/MFUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.942355", "long": "-3.351226", "status": "planning", "mw": 400, "ext_id": "14935"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14935", "Record Last Updated (dd/mm/yyyy)": "02/10/2023", "Operator (or Applicant)": "Clearstone Energy", "Site Name": "Junction 27, Westleigh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "North of A361, Junction 27 Westleigh", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX16 7ES", "X-coordinate": "305163", "Y-coordinate": "116749", "Planning Authority": "Mid Devon District Council", "Planning Application Reference": "23/01351/MFUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.942355", "long": "-3.351226", "status": "planning", "mw": 400, "ext_id": "14935"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Junction 27, Westleigh - Battery Storage", "name_short": "Junction 27, Westleigh", "owner": "Clearstone Energy", "state": "south west", "country": "uk", "lat": "50.942355", "long": "-3.351226", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.942355+-3.351226", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cargo Road, Cargo - Battery Storage", "city": "", "id": "1257", "external_id": "14939", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1257", "external_id": "14939", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cargo Road, Cargo - Battery Storage", "external_id": "14939", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Immersa Limited", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.922902", "long": "-2.979062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14939", "Record Last Updated (dd/mm/yyyy)": "03/10/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Cargo Road, Cargo - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south of Cargo Beck House, Cargo, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4BB", "X-coordinate": "337348", "Y-coordinate": "559129", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0613", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.922902", "long": "-2.979062", "status": "planning", "mw": 200, "ext_id": "14939"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14939", "Record Last Updated (dd/mm/yyyy)": "03/10/2023", "Operator (or Applicant)": "Immersa Limited", "Site Name": "Cargo Road, Cargo - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land to the south of Cargo Beck House, Cargo, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4BB", "X-coordinate": "337348", "Y-coordinate": "559129", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0613", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.922902", "long": "-2.979062", "status": "planning", "mw": 200, "ext_id": "14939"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cargo Road, Cargo - Battery Storage", "name_short": "Cargo Road, Cargo", "owner": "Immersa Limited", "state": "north west", "country": "uk", "lat": "54.922902", "long": "-2.979062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.922902+-2.979062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Warren Lane, Bramham - Battery Energy Storage", "city": "", "id": "1258", "external_id": "14954", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1258", "external_id": "14954", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Warren Lane, Bramham - Battery Energy Storage", "external_id": "14954", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 35, "power_mw": 35, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.873894", "long": "-1.322843", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14954", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Warren Lane, Bramham - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Warren Lane, Bramham, Tadcaster", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS24 9NU", "X-coordinate": "444620", "Y-coordinate": "442178", "Planning Authority": "Leeds City Council", "Planning Application Reference": "23/04572/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.873894", "long": "-1.322843", "status": "planning", "mw": 35, "ext_id": "14954"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14954", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Warren Lane, Bramham - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Warren Lane, Bramham, Tadcaster", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS24 9NU", "X-coordinate": "444620", "Y-coordinate": "442178", "Planning Authority": "Leeds City Council", "Planning Application Reference": "23/04572/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.873894", "long": "-1.322843", "status": "planning", "mw": 35, "ext_id": "14954"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 35, "mwh_is_estimate": true, "mwh": 35, "mwh_estimate": 35, "status": "planning", "status_class": "", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Warren Lane, Bramham - Battery Energy Storage", "name_short": "Warren Lane, Bramham", "owner": "Harmony Energy Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.873894", "long": "-1.322843", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.873894+-1.322843", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Little Hale Fen - Solar Farm", "city": "", "id": "1259", "external_id": "14955", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "AGR Solar 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1259", "external_id": "14955", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Little Hale Fen - Solar Farm", "external_id": "14955", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "AGR Solar 2 Limited", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.941644", "long": "-0.255062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14955", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "AGR Solar 2 Limited", "Site Name": "Little Hale Fen - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9586", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG34 9LT", "X-coordinate": "517357", "Y-coordinate": "339675", "Planning Authority": "North Kesteven District Council", "Planning Application Reference": "23/1021/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.941644", "long": "-0.255062", "status": "planning", "mw": 49, "ext_id": "14955"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14955", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "AGR Solar 2 Limited", "Site Name": "Little Hale Fen - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "9586", "Installed Capacity (MWelec)": "49.99", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG34 9LT", "X-coordinate": "517357", "Y-coordinate": "339675", "Planning Authority": "North Kesteven District Council", "Planning Application Reference": "23/1021/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.941644", "long": "-0.255062", "status": "planning", "mw": 49, "ext_id": "14955"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Little Hale Fen - Solar Farm", "name_short": "Little Hale Fen - Solar Farm", "owner": "AGR Solar 2 Limited", "state": "east midlands", "country": "uk", "lat": "52.941644", "long": "-0.255062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.941644+-0.255062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Old Trent Road, Beckingham - Battery Storage Facility ", "city": "", "id": "1260", "external_id": "14956", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Recell Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1260", "external_id": "14956", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Old Trent Road, Beckingham - Battery Storage Facility ", "external_id": "14956", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Recell Energy", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.405933", "long": "-0.806456", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14956", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Recell Energy", "Site Name": "Old Trent Road, Beckingham - Battery Storage Facility ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off Old Trent Road, Beckingham, Doncaster", "County": "South Yorkshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN10 4NR", "X-coordinate": "479444", "Y-coordinate": "390565", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "23/01096/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.405933", "long": "-0.806456", "status": "planning", "mw": 80, "ext_id": "14956"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14956", "Record Last Updated (dd/mm/yyyy)": "04/10/2023", "Operator (or Applicant)": "Recell Energy", "Site Name": "Old Trent Road, Beckingham - Battery Storage Facility ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off Old Trent Road, Beckingham, Doncaster", "County": "South Yorkshire", "Region": "East Midlands", "Country": "England", "Post Code": "DN10 4NR", "X-coordinate": "479444", "Y-coordinate": "390565", "Planning Authority": "Bassetlaw District Council", "Planning Application Reference": "23/01096/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.405933", "long": "-0.806456", "status": "planning", "mw": 80, "ext_id": "14956"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Old Trent Road, Beckingham - Battery Storage Facility ", "name_short": "Old Trent Road, Beckingham - Batter...", "owner": "Recell Energy", "state": "east midlands", "country": "uk", "lat": "53.405933", "long": "-0.806456", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.405933+-0.806456", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Fox Cover Road - Battery Energy Storage", "city": "", "id": "1261", "external_id": "14968", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1261", "external_id": "14968", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Fox Cover Road - Battery Energy Storage", "external_id": "14968", "state": "north east", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.886083", "long": "-1.458327", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14968", "Record Last Updated (dd/mm/yyyy)": "05/10/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Fox Cover Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Foxcover Road Sunderland\n", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "SR4 9NL", "X-coordinate": "434847", "Y-coordinate": "554727", "Planning Authority": "Sunderland City Council", "Planning Application Reference": "23/01981/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.886083", "long": "-1.458327", "status": "planning", "mw": 30, "ext_id": "14968"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14968", "Record Last Updated (dd/mm/yyyy)": "05/10/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Fox Cover Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Foxcover Road Sunderland\n", "County": "Tyne And Wear", "Region": "North East", "Country": "England", "Post Code": "SR4 9NL", "X-coordinate": "434847", "Y-coordinate": "554727", "Planning Authority": "Sunderland City Council", "Planning Application Reference": "23/01981/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "18/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.886083", "long": "-1.458327", "status": "planning", "mw": 30, "ext_id": "14968"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-05", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Fox Cover Road - Battery Energy Storage", "name_short": "Fox Cover Road", "owner": "Newton Energi Limited", "state": "north east", "country": "uk", "lat": "54.886083", "long": "-1.458327", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.886083+-1.458327", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ditcher Law Wind Farm", "city": "", "id": "1262", "external_id": "14996", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "E Power Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1262", "external_id": "14996", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ditcher Law Wind Farm", "external_id": "14996", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "E Power Ltd", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.794816", "long": "-2.804023", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "14996", "Record Last Updated (dd/mm/yyyy)": "09/10/2023", "Operator (or Applicant)": "E Power Ltd", "Site Name": "Ditcher Law Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8376", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/S/E & W/O Vineleaf Cottage", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD2 6RD", "X-coordinate": "349687", "Y-coordinate": "656017", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004890", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.794816", "long": "-2.804023", "status": "planning", "mw": 30, "ext_id": "14996"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "14996", "Record Last Updated (dd/mm/yyyy)": "09/10/2023", "Operator (or Applicant)": "E Power Ltd", "Site Name": "Ditcher Law Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "8376", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/S/E & W/O Vineleaf Cottage", "County": "Borders", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD2 6RD", "X-coordinate": "349687", "Y-coordinate": "656017", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004890", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.794816", "long": "-2.804023", "status": "planning", "mw": 30, "ext_id": "14996"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-09", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ditcher Law Wind Farm", "name_short": "Ditcher Law Wind Farm", "owner": "E Power Ltd", "state": "scotland", "country": "uk", "lat": "55.794816", "long": "-2.804023", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.794816+-2.804023", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Blackdyke Farm, Blackford - Battery Storage", "city": "", "id": "1263", "external_id": "15005", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1263", "external_id": "15005", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Blackdyke Farm, Blackford - Battery Storage", "external_id": "15005", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 400, "power_mw": 400, "owner": "Innova Renewables", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.953508", "long": "-2.968236", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15005", "Record Last Updated (dd/mm/yyyy)": "25/10/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "Blackdyke Farm, Blackford - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of Blackdyke Farm, Blackford", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4EY", "X-coordinate": "338089", "Y-coordinate": "562525", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0444", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.953508", "long": "-2.968236", "status": "planning", "mw": 400, "ext_id": "15005"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15005", "Record Last Updated (dd/mm/yyyy)": "25/10/2023", "Operator (or Applicant)": "Innova Renewables", "Site Name": "Blackdyke Farm, Blackford - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "400", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West of Blackdyke Farm, Blackford", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 4EY", "X-coordinate": "338089", "Y-coordinate": "562525", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0444", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "21/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "05/10/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "05/10/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.953508", "long": "-2.968236", "status": "planning", "mw": 400, "ext_id": "15005"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-25", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 400, "mwh_is_estimate": true, "mwh": 400, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Blackdyke Farm, Blackford - Battery Storage", "name_short": "Blackdyke Farm, Blackford", "owner": "Innova Renewables", "state": "north west", "country": "uk", "lat": "54.953508", "long": "-2.968236", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.953508+-2.968236", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Severn Road, Hallen - Battery Storage Facility", "city": "", "id": "1264", "external_id": "15027", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "EL Avonmouth Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1264", "external_id": "15027", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Severn Road, Hallen - Battery Storage Facility", "external_id": "15027", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 70, "power_mw": 70, "owner": "EL Avonmouth Limited", "status": "planning", "date_first_heard": "2023-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.528262", "long": "-2.660641", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15027", "Record Last Updated (dd/mm/yyyy)": "11/10/2023", "Operator (or Applicant)": "EL Avonmouth Limited", "Site Name": "Severn Road, Hallen - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Severn Road, Hallen, Bristol", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS10 7RZ", "X-coordinate": "354267", "Y-coordinate": "181246", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P23/02741/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.528262", "long": "-2.660641", "status": "planning", "mw": 70, "ext_id": "15027"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15027", "Record Last Updated (dd/mm/yyyy)": "11/10/2023", "Operator (or Applicant)": "EL Avonmouth Limited", "Site Name": "Severn Road, Hallen - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "70", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Severn Road, Hallen, Bristol", "County": "South Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "BS10 7RZ", "X-coordinate": "354267", "Y-coordinate": "181246", "Planning Authority": "South Gloucestershire District Council", "Planning Application Reference": "P23/02741/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.528262", "long": "-2.660641", "status": "planning", "mw": 70, "ext_id": "15027"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 70, "mwh_is_estimate": true, "mwh": 70, "mwh_estimate": 70, "status": "planning", "status_class": "", "date_first_heard": "2023-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Severn Road, Hallen - Battery Storage Facility", "name_short": "Severn Road, Hallen", "owner": "EL Avonmouth Limited", "state": "south west", "country": "uk", "lat": "51.528262", "long": "-2.660641", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.528262+-2.660641", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Stocking Lane - Battery Energy Facility", "city": "", "id": "1265", "external_id": "15082", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Nel Tiger", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1265", "external_id": "15082", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Stocking Lane - Battery Energy Facility", "external_id": "15082", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Nel Tiger", "status": "planning", "date_first_heard": "2023-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.708951", "long": "-1.208247", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15082", "Record Last Updated (dd/mm/yyyy)": "23/10/2023", "Operator (or Applicant)": "Nel Tiger", "Site Name": "Stocking Lane - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stocking Lane, Weeland Road, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8DL", "X-coordinate": "452359", "Y-coordinate": "423905", "Planning Authority": "Selby District Council", "Planning Application Reference": "ZG2023/0938/FULM\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.708951", "long": "-1.208247", "status": "planning", "mw": 200, "ext_id": "15082"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15082", "Record Last Updated (dd/mm/yyyy)": "23/10/2023", "Operator (or Applicant)": "Nel Tiger", "Site Name": "Stocking Lane - Battery Energy Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Stocking Lane, Weeland Road, Knottingley", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF11 8DL", "X-coordinate": "452359", "Y-coordinate": "423905", "Planning Authority": "Selby District Council", "Planning Application Reference": "ZG2023/0938/FULM\n", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "16/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.708951", "long": "-1.208247", "status": "planning", "mw": 200, "ext_id": "15082"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Stocking Lane - Battery Energy Facility", "name_short": "Stocking Lane - Battery Energy Faci...", "owner": "Nel Tiger", "state": "yorkshire and humber", "country": "uk", "lat": "53.708951", "long": "-1.208247", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.708951+-1.208247", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Heron Solar Farm & Battery Storage", "city": "", "id": "1266", "external_id": "15084", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "JBM Solar Projects 38 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1266", "external_id": "15084", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Heron Solar Farm & Battery Storage", "external_id": "15084", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "JBM Solar Projects 38 Limited", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.924208", "long": "-1.02102", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "15084", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "JBM Solar Projects 38 Limited", "Site Name": "Heron Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15083", "Installed Capacity (MWelec)": "20", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "North Of Staragglethorpe Road Stragglethorpe, Colnbrook", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG12 2JX", "X-coordinate": "465913", "Y-coordinate": "336759", "Planning Authority": "Rushcliffe Council", "Planning Application Reference": "23/02250/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "06/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.924208", "long": "-1.02102", "status": "planning", "mw": 20, "ext_id": "15084"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "15084", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "JBM Solar Projects 38 Limited", "Site Name": "Heron Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15083", "Installed Capacity (MWelec)": "20", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "North Of Staragglethorpe Road Stragglethorpe, Colnbrook", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG12 2JX", "X-coordinate": "465913", "Y-coordinate": "336759", "Planning Authority": "Rushcliffe Council", "Planning Application Reference": "23/02250/FUL", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "06/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.924208", "long": "-1.02102", "status": "planning", "mw": 20, "ext_id": "15084"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Heron Solar Farm & Battery Storage", "name_short": "Heron Solar Farm &", "owner": "JBM Solar Projects 38 Limited", "state": "east midlands", "country": "uk", "lat": "52.924208", "long": "-1.02102", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.924208+-1.02102", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hare Craig Windfarm", "city": "", "id": "1267", "external_id": "15101", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "EnergieKontor UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1267", "external_id": "15101", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hare Craig Windfarm", "external_id": "15101", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "EnergieKontor UK", "status": "planning", "date_first_heard": "2022-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.555964", "long": "-3.99784", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15101", "Record Last Updated (dd/mm/yyyy)": "24/10/2023", "Operator (or Applicant)": "EnergieKontor UK", "Site Name": "Hare Craig Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7261", "Installed Capacity (MWelec)": "13.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Hare Craig, Muirkirk, Cumnock, Strathclyde", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "274078", "Y-coordinate": "630954", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "20/0001/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/07/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.555964", "long": "-3.99784", "status": "planning", "mw": 13, "ext_id": "15101"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15101", "Record Last Updated (dd/mm/yyyy)": "24/10/2023", "Operator (or Applicant)": "EnergieKontor UK", "Site Name": "Hare Craig Windfarm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7261", "Installed Capacity (MWelec)": "13.9", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land At Hare Craig, Muirkirk, Cumnock, Strathclyde", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "274078", "Y-coordinate": "630954", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "20/0001/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/01/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "12/07/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "12/07/2027", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.555964", "long": "-3.99784", "status": "planning", "mw": 13, "ext_id": "15101"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "planning", "status_class": "", "date_first_heard": "2022-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hare Craig Windfarm", "name_short": "Hare Craig Windfarm", "owner": "EnergieKontor UK", "state": "scotland", "country": "uk", "lat": "55.555964", "long": "-3.99784", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.555964+-3.99784", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "city": "", "id": "1268", "external_id": "15127", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "W Rigby & Sons", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1268", "external_id": "15127", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "external_id": "15127", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 13, "power_mw": 13, "owner": "W Rigby & Sons", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.340564", "long": "-1.960056", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15127", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "W Rigby & Sons", "Site Name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chinley House Farm, Dolly Lane, Buxworth, High Peak", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK23 7NP", "X-coordinate": "402757", "Y-coordinate": "382630", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2023/0407", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.340564", "long": "-1.960056", "status": "planning", "mw": 13, "ext_id": "15127"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15127", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "W Rigby & Sons", "Site Name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "13", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chinley House Farm, Dolly Lane, Buxworth, High Peak", "County": "Derbyshire", "Region": "East Midlands", "Country": "England", "Post Code": "SK23 7NP", "X-coordinate": "402757", "Y-coordinate": "382630", "Planning Authority": "High Peak Borough Council", "Planning Application Reference": "HPK/2023/0407", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.340564", "long": "-1.960056", "status": "planning", "mw": 13, "ext_id": "15127"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 13, "mwh_is_estimate": true, "mwh": 13, "mwh_estimate": 13, "status": "planning", "status_class": "", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "name_short": "Dolly Lane, Buxworth - Battery Stor...", "owner": "W Rigby & Sons", "state": "east midlands", "country": "uk", "lat": "53.340564", "long": "-1.960056", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.340564+-1.960056", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Tanners Lane - Battery Energy Storage System", "city": "", "id": "1269", "external_id": "15128", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Tag Energy Development UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1269", "external_id": "15128", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Tanners Lane - Battery Energy Storage System", "external_id": "15128", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 30, "power_mw": 30, "owner": "Tag Energy Development UK Limited", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.402358", "long": "-1.605087", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15128", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Tag Energy Development UK Limited", "Site Name": "Tanners Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off Tanners Lane, Coventry", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DD", "X-coordinate": "426965", "Y-coordinate": "278334", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2023/02051/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.402358", "long": "-1.605087", "status": "planning", "mw": 30, "ext_id": "15128"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15128", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Tag Energy Development UK Limited", "Site Name": "Tanners Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "30", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Off Tanners Lane, Coventry", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DD", "X-coordinate": "426965", "Y-coordinate": "278334", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2023/02051/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.402358", "long": "-1.605087", "status": "planning", "mw": 30, "ext_id": "15128"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 30, "mwh_is_estimate": true, "mwh": 30, "mwh_estimate": 30, "status": "planning", "status_class": "", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Tanners Lane - Battery Energy Storage System", "name_short": "Tanners Lane - Battery", "owner": "Tag Energy Development UK Limited", "state": "west midlands", "country": "uk", "lat": "52.402358", "long": "-1.605087", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.402358+-1.605087", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Aikengall, Innerwick - Battery Energy Storage", "city": "", "id": "1270", "external_id": "15141", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Redstone Rig Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1270", "external_id": "15141", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Aikengall, Innerwick - Battery Energy Storage", "external_id": "15141", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 19, "power_mw": 19, "owner": "Redstone Rig Storage Limited", "status": "planning", "date_first_heard": "2023-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.948866", "long": "-2.466127", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": " ", "Ref ID": "15141", "Record Last Updated (dd/mm/yyyy)": "31/10/2023", "Operator (or Applicant)": "Redstone Rig Storage Limited", "Site Name": "Aikengall, Innerwick - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4526", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Aikengall Innerwick Dunbar\ufffd", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH42 1SG", "X-coordinate": "370988", "Y-coordinate": "672968", "Planning Authority": "East Lothian Council", "Planning Application Reference": "23/01071/P", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "11/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.948866", "long": "-2.466127", "status": "planning", "mw": 19, "ext_id": "15141"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": " ", "Ref ID": "15141", "Record Last Updated (dd/mm/yyyy)": "31/10/2023", "Operator (or Applicant)": "Redstone Rig Storage Limited", "Site Name": "Aikengall, Innerwick - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "4526", "Installed Capacity (MWelec)": "19.9", "Share Community Scheme": " ", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": " ", "FiT Tariff (p/kWh)": " ", "CfD Capacity (MW)": " ", "Turbine Capacity (MW)": " ", "No. of Turbines": " ", "Height of Turbines (m)": " ", "Mounting Type for Solar": " ", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": " ", "Are they re-applying (Old REPD Ref) ": " ", "Address": "Aikengall Innerwick Dunbar\ufffd", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "EH42 1SG", "X-coordinate": "370988", "Y-coordinate": "672968", "Planning Authority": "East Lothian Council", "Planning Application Reference": "23/01071/P", "Appeal Reference": " ", "Secretary of State Reference": " ", "Type of Secretary of State Intervention": " ", "Judicial Review": " ", "Offshore Wind Round": " ", "Planning Application Submitted": "11/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.948866", "long": "-2.466127", "status": "planning", "mw": 19, "ext_id": "15141"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-31", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 19, "mwh_is_estimate": true, "mwh": 19, "mwh_estimate": 19, "status": "planning", "status_class": "", "date_first_heard": "2023-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Aikengall, Innerwick - Battery Energy Storage", "name_short": "Aikengall, Innerwick", "owner": "Redstone Rig Storage Limited", "state": "scotland", "country": "uk", "lat": "55.948866", "long": "-2.466127", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.948866+-2.466127", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Red Barn - Solar Farm & Battery Storage", "city": "", "id": "1271", "external_id": "15146", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1271", "external_id": "15146", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Red Barn - Solar Farm & Battery Storage", "external_id": "15146", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Eden Renewables", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.500536", "long": "-2.126064", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15146", "Record Last Updated (dd/mm/yyyy)": "01/11/2023", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Red Barn - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15145", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Red Barn, East of Kington St Michael", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14 6BQ", "X-coordinate": "391346", "Y-coordinate": "177963", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2023/08481", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.500536", "long": "-2.126064", "status": "planning", "mw": 40, "ext_id": "15146"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15146", "Record Last Updated (dd/mm/yyyy)": "01/11/2023", "Operator (or Applicant)": "Eden Renewables", "Site Name": "Red Barn - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15145", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Red Barn, East of Kington St Michael", "County": "Wiltshire", "Region": "South West", "Country": "England", "Post Code": "SN14 6BQ", "X-coordinate": "391346", "Y-coordinate": "177963", "Planning Authority": "Wiltshire Council", "Planning Application Reference": "PL/2023/08481", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.500536", "long": "-2.126064", "status": "planning", "mw": 40, "ext_id": "15146"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": true, "mwh": 40, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Red Barn - Solar Farm & Battery Storage", "name_short": "Red Barn - Solar Farm &", "owner": "Eden Renewables", "state": "south west", "country": "uk", "lat": "51.500536", "long": "-2.126064", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.500536+-2.126064", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coolkeeragh - Battery Storage", "city": "", "id": "1272", "external_id": "15151", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "140", "customer": "", "owner": "Coolkeeragh BES Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1272", "external_id": "15151", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coolkeeragh - Battery Storage", "external_id": "15151", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 140, "power_mw": 140, "owner": "Coolkeeragh BES Ltd", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.034233", "long": "-7.251546", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15151", "Record Last Updated (dd/mm/yyyy)": "01/11/2023", "Operator (or Applicant)": "Coolkeeragh BES Ltd", "Site Name": "Coolkeeragh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "140", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "23 Maydown Road , Londonderry", "County": "Co. Derry & Strabane", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT47 6UJ", "X-coordinate": "\t64602", "Y-coordinate": "\t583695", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA11/2023/1679/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.034233", "long": "-7.251546", "status": "planning", "mw": 140, "ext_id": "15151"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15151", "Record Last Updated (dd/mm/yyyy)": "01/11/2023", "Operator (or Applicant)": "Coolkeeragh BES Ltd", "Site Name": "Coolkeeragh - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "140", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "23 Maydown Road , Londonderry", "County": "Co. Derry & Strabane", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT47 6UJ", "X-coordinate": "\t64602", "Y-coordinate": "\t583695", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA11/2023/1679/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.034233", "long": "-7.251546", "status": "planning", "mw": 140, "ext_id": "15151"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 140, "mwh_is_estimate": true, "mwh": 140, "mwh_estimate": 140, "status": "planning", "status_class": "", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coolkeeragh - Battery Storage", "name_short": "Coolkeeragh", "owner": "Coolkeeragh BES Ltd", "state": "northern ireland", "country": "uk", "lat": "55.034233", "long": "-7.251546", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.034233+-7.251546", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Flatterton Farm, Flatterton Road - Battery Storage", "city": "", "id": "1273", "external_id": "15154", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Big Battery (Flatterton Farm) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1273", "external_id": "15154", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Flatterton Farm, Flatterton Road - Battery Storage", "external_id": "15154", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Big Battery (Flatterton Farm) Limited", "status": "planning", "date_first_heard": "2023-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.9331", "long": "-4.846146", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15154", "Record Last Updated (dd/mm/yyyy)": "02/11/2023", "Operator (or Applicant)": "Big Battery (Flatterton Farm) Limited", "Site Name": "Flatterton Farm, Flatterton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Flatterton Farm, Flatterton Road, Greenock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA16 0AD", "X-coordinate": "222306", "Y-coordinate": "674775", "Planning Authority": "Inverclyde Council", "Planning Application Reference": "23/0205/IC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.9331", "long": "-4.846146", "status": "planning", "mw": 49, "ext_id": "15154"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15154", "Record Last Updated (dd/mm/yyyy)": "02/11/2023", "Operator (or Applicant)": "Big Battery (Flatterton Farm) Limited", "Site Name": "Flatterton Farm, Flatterton Road - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Flatterton Farm, Flatterton Road, Greenock", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA16 0AD", "X-coordinate": "222306", "Y-coordinate": "674775", "Planning Authority": "Inverclyde Council", "Planning Application Reference": "23/0205/IC", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.9331", "long": "-4.846146", "status": "planning", "mw": 49, "ext_id": "15154"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Flatterton Farm, Flatterton Road - Battery Storage", "name_short": "Flatterton Farm, Flatterton Road", "owner": "Big Battery (Flatterton Farm) Limited", "state": "scotland", "country": "uk", "lat": "55.9331", "long": "-4.846146", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.9331+-4.846146", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Monk Fryston Battery Storage", "city": "", "id": "1274", "external_id": "15164", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "320", "power_mw": "320", "customer": "", "owner": "SSE Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1274", "external_id": "15164", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Monk Fryston Battery Storage", "external_id": "15164", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 320, "power_mw": 320, "owner": "SSE Renewables", "status": "planning", "date_first_heard": "2022-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.754381", "long": "-1.265071", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15164", "Record Last Updated (dd/mm/yyyy)": "02/11/2023", "Operator (or Applicant)": "SSE Renewables", "Site Name": "Monk Fryston Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "320", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South Of Electricity Substation Rawfield Lane, Fairburn, Selby, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS25 5LD", "X-coordinate": "448556", "Y-coordinate": "428919", "Planning Authority": "North Yorkshire Council", "Planning Application Reference": "2021/0633/FULM", "Appeal Reference": "APP/N2739/W/22/3290256", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/12/2021", "Appeal Lodged": "07/01/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "01/08/2022", "Planning Permission Granted": "01/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.754381", "long": "-1.265071", "status": "planning", "mw": 320, "ext_id": "15164"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15164", "Record Last Updated (dd/mm/yyyy)": "02/11/2023", "Operator (or Applicant)": "SSE Renewables", "Site Name": "Monk Fryston Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "320", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South Of Electricity Substation Rawfield Lane, Fairburn, Selby, ", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "LS25 5LD", "X-coordinate": "448556", "Y-coordinate": "428919", "Planning Authority": "North Yorkshire Council", "Planning Application Reference": "2021/0633/FULM", "Appeal Reference": "APP/N2739/W/22/3290256", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "19/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "15/12/2021", "Appeal Lodged": "07/01/2022", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "01/08/2022", "Planning Permission Granted": "01/08/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "01/08/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.754381", "long": "-1.265071", "status": "planning", "mw": 320, "ext_id": "15164"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-02", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 320, "mwh_is_estimate": true, "mwh": 320, "mwh_estimate": 320, "status": "planning", "status_class": "", "date_first_heard": "2022-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Monk Fryston Battery Storage", "name_short": "Monk Fryston", "owner": "SSE Renewables", "state": "yorkshire and humber", "country": "uk", "lat": "53.754381", "long": "-1.265071", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.754381+-1.265071", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wareham Road, Scouse Farm - Battery Storage", "city": "", "id": "1275", "external_id": "15165", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Ylem Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1275", "external_id": "15165", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wareham Road, Scouse Farm - Battery Storage", "external_id": "15165", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Ylem Energy Limited", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.786682", "long": "-2.931865", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15165", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Ylem Energy Limited", "Site Name": "Wareham Road, Scouse Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Of Wareham Road Scouse Farm Blackpool Corner ", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX13 5UE", "X-coordinate": "334407", "Y-coordinate": "98982", "Planning Authority": "East Devon District Council", "Planning Application Reference": "23/2099/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.786682", "long": "-2.931865", "status": "planning", "mw": 50, "ext_id": "15165"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15165", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Ylem Energy Limited", "Site Name": "Wareham Road, Scouse Farm - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "West Of Wareham Road Scouse Farm Blackpool Corner ", "County": "Devon", "Region": "South West", "Country": "England", "Post Code": "EX13 5UE", "X-coordinate": "334407", "Y-coordinate": "98982", "Planning Authority": "East Devon District Council", "Planning Application Reference": "23/2099/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.786682", "long": "-2.931865", "status": "planning", "mw": 50, "ext_id": "15165"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wareham Road, Scouse Farm - Battery Storage", "name_short": "Wareham Road, Scouse Farm", "owner": "Ylem Energy Limited", "state": "south west", "country": "uk", "lat": "50.786682", "long": "-2.931865", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.786682+-2.931865", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Cloud Hill Wind Farm", "city": "", "id": "1276", "external_id": "15174", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "34", "customer": "", "owner": "Blue Energy Company / BayWa r.e. UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1276", "external_id": "15174", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Cloud Hill Wind Farm", "external_id": "15174", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 34, "power_mw": 34, "owner": "Blue Energy Company / BayWa r.e. UK Limited", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.325588", "long": "-3.986325", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15174", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Blue Energy Company / BayWa r.e. UK Limited", "Site Name": "Cloud Hill Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11112", "Installed Capacity (MWelec)": "34", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackaddie Road, Sanquhar", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG4 6DF", "X-coordinate": "274072", "Y-coordinate": "605300", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003461", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.325588", "long": "-3.986325", "status": "planning", "mw": 34, "ext_id": "15174"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15174", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Blue Energy Company / BayWa r.e. UK Limited", "Site Name": "Cloud Hill Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11112", "Installed Capacity (MWelec)": "34", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blackaddie Road, Sanquhar", "County": "Dumfries and Galloway", "Region": "Scotland", "Country": "Scotland", "Post Code": "DG4 6DF", "X-coordinate": "274072", "Y-coordinate": "605300", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003461", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.325588", "long": "-3.986325", "status": "planning", "mw": 34, "ext_id": "15174"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 34, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "planning", "status_class": "", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Cloud Hill Wind Farm", "name_short": "Cloud Hill Wind Farm", "owner": "Blue Energy Company / BayWa r.e. UK Limited", "state": "scotland", "country": "uk", "lat": "55.325588", "long": "-3.986325", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.325588+-3.986325", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Vale of Leven Wind Farm", "city": "", "id": "1277", "external_id": "15175", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Coriolis Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1277", "external_id": "15175", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Vale of Leven Wind Farm", "external_id": "15175", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Coriolis Energy Limited", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.92438", "long": "-4.452767", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15175", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Coriolis Energy Limited", "Site Name": "Vale of Leven Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11110", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kilpatrick Hills, Bonhill, Alexandria", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G60 5LX", "X-coordinate": "246839", "Y-coordinate": "672863", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003468", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.92438", "long": "-4.452767", "status": "planning", "mw": 20, "ext_id": "15175"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15175", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Coriolis Energy Limited", "Site Name": "Vale of Leven Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11110", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Kilpatrick Hills, Bonhill, Alexandria", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G60 5LX", "X-coordinate": "246839", "Y-coordinate": "672863", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003468", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.92438", "long": "-4.452767", "status": "planning", "mw": 20, "ext_id": "15175"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Vale of Leven Wind Farm", "name_short": "Vale of Leven Wind Farm", "owner": "Coriolis Energy Limited", "state": "scotland", "country": "uk", "lat": "55.92438", "long": "-4.452767", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.92438+-4.452767", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Kilmarnock Battery Energy Storage System", "city": "", "id": "1278", "external_id": "15176", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Intergen Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1278", "external_id": "15176", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Kilmarnock Battery Energy Storage System", "external_id": "15176", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Intergen Limited", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.572127", "long": "-4.438018", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15176", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Intergen Limited", "Site Name": "Kilmarnock Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "250 metres (m) to the north of the existing Kilmarnock South Substation", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JW", "X-coordinate": "246381", "Y-coordinate": "633639", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004941", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.572127", "long": "-4.438018", "status": "planning", "mw": 500, "ext_id": "15176"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15176", "Record Last Updated (dd/mm/yyyy)": "03/11/2023", "Operator (or Applicant)": "Intergen Limited", "Site Name": "Kilmarnock Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "250 metres (m) to the north of the existing Kilmarnock South Substation", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA1 5JW", "X-coordinate": "246381", "Y-coordinate": "633639", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004941", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.572127", "long": "-4.438018", "status": "planning", "mw": 500, "ext_id": "15176"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Kilmarnock Battery Energy Storage System", "name_short": "Kilmarnock Battery", "owner": "Intergen Limited", "state": "scotland", "country": "uk", "lat": "55.572127", "long": "-4.438018", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.572127+-4.438018", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "1279", "external_id": "15230", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coventry Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1279", "external_id": "15230", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "external_id": "15230", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Coventry Energy Storage Limited", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.386266", "long": "-1.610608", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15230", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Coventry Energy Storage Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12936", "Address": "E/O Hodgetts Lane, Berkswell, Solihull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426599", "Y-coordinate": "276542", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2023/02196/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386266", "long": "-1.610608", "status": "planning", "mw": 49, "ext_id": "15230"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15230", "Record Last Updated (dd/mm/yyyy)": "13/11/2023", "Operator (or Applicant)": "Coventry Energy Storage Limited", "Site Name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12936", "Address": "E/O Hodgetts Lane, Berkswell, Solihull", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "CV7 7DF", "X-coordinate": "426599", "Y-coordinate": "276542", "Planning Authority": "Solihull Metropolitan Borough Council", "Planning Application Reference": "PL/2023/02196/PPFL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.386266", "long": "-1.610608", "status": "planning", "mw": 49, "ext_id": "15230"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "name_short": "Hodgetts Lane, Berkswell - Electric...", "owner": "Coventry Energy Storage Limited", "state": "west midlands", "country": "uk", "lat": "52.386266", "long": "-1.610608", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.386266+-1.610608", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rock Farm - Solar Farm", "city": "", "id": "1280", "external_id": "15248", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1280", "external_id": "15248", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rock Farm - Solar Farm", "external_id": "15248", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Anglo Renewables", "status": "planning", "date_first_heard": "2023-09-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.377696", "long": "-2.699588", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15248", "Record Last Updated (dd/mm/yyyy)": "15/11/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Rock Farm - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15248", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SE Of Rock Farm Rocks Green Ludlow ", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "SY8 2DS", "X-coordinate": "352474", "Y-coordinate": "275748", "Planning Authority": "Shropshire Council", "Planning Application Reference": "22/05424/EIA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.377696", "long": "-2.699588", "status": "planning", "mw": 12, "ext_id": "15248"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15248", "Record Last Updated (dd/mm/yyyy)": "15/11/2023", "Operator (or Applicant)": "Anglo Renewables", "Site Name": "Rock Farm - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15248", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "SE Of Rock Farm Rocks Green Ludlow ", "County": "Shropshire", "Region": "West Midlands", "Country": "England", "Post Code": "SY8 2DS", "X-coordinate": "352474", "Y-coordinate": "275748", "Planning Authority": "Shropshire Council", "Planning Application Reference": "22/05424/EIA", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "25/09/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "25/09/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.377696", "long": "-2.699588", "status": "planning", "mw": 12, "ext_id": "15248"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2023-09-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rock Farm - Solar Farm", "name_short": "Rock Farm - Solar Farm", "owner": "Anglo Renewables", "state": "west midlands", "country": "uk", "lat": "52.377696", "long": "-2.699588", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.377696+-2.699588", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "city": "", "id": "1281", "external_id": "15263", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Enso Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1281", "external_id": "15263", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "external_id": "15263", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 350, "power_mw": 350, "owner": "Enso Energy Limited", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.5452", "long": "-2.960247", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15263", "Record Last Updated (dd/mm/yyyy)": "16/01/2024", "Operator (or Applicant)": "Enso Energy Limited", "Site Name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "350", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Uskmouth Power Station, West Nash Road, Nash, Newport", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP18 2BZ", "X-coordinate": "333508", "Y-coordinate": "183360", "Planning Authority": "Newport City Council", "Planning Application Reference": "23/0949", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/01/2024", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/01/2029", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.5452", "long": "-2.960247", "status": "planning", "mw": 350, "ext_id": "15263"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15263", "Record Last Updated (dd/mm/yyyy)": "16/01/2024", "Operator (or Applicant)": "Enso Energy Limited", "Site Name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "350", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Uskmouth Power Station, West Nash Road, Nash, Newport", "County": "Gwent", "Region": "Wales", "Country": "Wales", "Post Code": "NP18 2BZ", "X-coordinate": "333508", "Y-coordinate": "183360", "Planning Authority": "Newport City Council", "Planning Application Reference": "23/0949", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "25/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "11/01/2024", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "11/01/2029", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.5452", "long": "-2.960247", "status": "planning", "mw": 350, "ext_id": "15263"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-16", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 350, "mwh_is_estimate": true, "mwh": 350, "mwh_estimate": 350, "status": "planning", "status_class": "", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "name_short": "Uskmouth Power Station, West Nash R...", "owner": "Enso Energy Limited", "state": "wales", "country": "uk", "lat": "51.5452", "long": "-2.960247", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.5452+-2.960247", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "New Road, Featherstone - Battery Storage", "city": "", "id": "1282", "external_id": "15297", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Chiltern Renewables Hockliffe Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1282", "external_id": "15297", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "New Road, Featherstone - Battery Storage", "external_id": "15297", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "Chiltern Renewables Hockliffe Limited", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.647388", "long": "-2.093176", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15297", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Chiltern Renewables Hockliffe Limited", "Site Name": "New Road, Featherstone - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O New Road, Featherstone, Wolverhampton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV10 7TU", "X-coordinate": "393793", "Y-coordinate": "305521", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/01031/OUTM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.647388", "long": "-2.093176", "status": "planning", "mw": 100, "ext_id": "15297"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15297", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Chiltern Renewables Hockliffe Limited", "Site Name": "New Road, Featherstone - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "N/O New Road, Featherstone, Wolverhampton", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV10 7TU", "X-coordinate": "393793", "Y-coordinate": "305521", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/01031/OUTM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.647388", "long": "-2.093176", "status": "planning", "mw": 100, "ext_id": "15297"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "New Road, Featherstone - Battery Storage", "name_short": "New Road, Featherstone", "owner": "Chiltern Renewables Hockliffe Limited", "state": "west midlands", "country": "uk", "lat": "52.647388", "long": "-2.093176", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.647388+-2.093176", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Battery Energy Storage Facility in Londonderry", "city": "", "id": "1283", "external_id": "15303", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "34", "customer": "", "owner": "Heron Storage Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1283", "external_id": "15303", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Battery Energy Storage Facility in Londonderry", "external_id": "15303", "state": "northern ireland", "country": "uk", "mwh": 0, "estimate_mwh": 34, "power_mw": 34, "owner": "Heron Storage Ltd", "status": "planning", "date_first_heard": "2023-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.034435", "long": "-7.208204", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15303", "Record Last Updated (dd/mm/yyyy)": "22/11/2023", "Operator (or Applicant)": "Heron Storage Ltd", "Site Name": "Battery Energy Storage Facility in Londonderry", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "34", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lands At Campsie Industrial Estate , C. 65m S.E. Of E+I Engineering Campsie Unit, Campsie, Londonderry", "County": "Co. Derry & Strabane", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT47 3XY", "X-coordinate": "67370", "Y-coordinate": "583510", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA11/2023/2109/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.034435", "long": "-7.208204", "status": "planning", "mw": 34, "ext_id": "15303"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15303", "Record Last Updated (dd/mm/yyyy)": "22/11/2023", "Operator (or Applicant)": "Heron Storage Ltd", "Site Name": "Battery Energy Storage Facility in Londonderry", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "34", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lands At Campsie Industrial Estate , C. 65m S.E. Of E+I Engineering Campsie Unit, Campsie, Londonderry", "County": "Co. Derry & Strabane", "Region": "Northern Ireland", "Country": "Northern Ireland", "Post Code": "BT47 3XY", "X-coordinate": "67370", "Y-coordinate": "583510", "Planning Authority": "Northern Ireland Planning Service", "Planning Application Reference": "LA11/2023/2109/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "31/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.034435", "long": "-7.208204", "status": "planning", "mw": 34, "ext_id": "15303"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-22", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 34, "mwh_is_estimate": true, "mwh": 34, "mwh_estimate": 34, "status": "planning", "status_class": "", "date_first_heard": "2023-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Battery Energy Storage Facility in Londonderry", "name_short": "Battery Energy Storage Facility in ...", "owner": "Heron Storage Ltd", "state": "northern ireland", "country": "uk", "lat": "55.034435", "long": "-7.208204", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.034435+-7.208204", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Lowfields Energy Storage Project", "city": "", "id": "1284", "external_id": "15304", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1284", "external_id": "15304", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Lowfields Energy Storage Project", "external_id": "15304", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "UK Battery Storage", "status": "planning", "date_first_heard": "2023-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15304", "Record Last Updated (dd/mm/yyyy)": "23/11/2023", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Lowfields Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10236", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "22/01356/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "15304"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15304", "Record Last Updated (dd/mm/yyyy)": "23/11/2023", "Operator (or Applicant)": "UK Battery Storage", "Site Name": "Lowfields Energy Storage Project", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10236", "Address": "Land To South Of, Lowfields Way, Lowfields Business Park, Elland", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HX5 9DA", "X-coordinate": "411689", "Y-coordinate": "421815", "Planning Authority": "Calderdale Metropolitan Borough Council", "Planning Application Reference": "22/01356/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "13/12/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/03/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/03/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.692652", "long": "-1.82446", "status": "planning", "mw": 49, "ext_id": "15304"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Lowfields Energy Storage Project", "name_short": "Lowfields", "owner": "UK Battery Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.692652", "long": "-1.82446", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.692652+-1.82446", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chapel Lane - Battery Energy Storage System", "city": "", "id": "1285", "external_id": "15308", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1285", "external_id": "15308", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chapel Lane - Battery Energy Storage System", "external_id": "15308", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco Limited", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.562502", "long": "-1.925062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15308", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Chapel Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9721", "Address": "Adj The Duckery, Chapel Lane, Great Barr, Walsall", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS9 0QU", "X-coordinate": "405177", "Y-coordinate": "296077", "Planning Authority": "Walsall Metropolitan Borough Council", "Planning Application Reference": "23/1286", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.562502", "long": "-1.925062", "status": "planning", "mw": 49, "ext_id": "15308"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15308", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Chapel Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9721", "Address": "Adj The Duckery, Chapel Lane, Great Barr, Walsall", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS9 0QU", "X-coordinate": "405177", "Y-coordinate": "296077", "Planning Authority": "Walsall Metropolitan Borough Council", "Planning Application Reference": "23/1286", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.562502", "long": "-1.925062", "status": "planning", "mw": 49, "ext_id": "15308"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chapel Lane - Battery Energy Storage System", "name_short": "Chapel Lane - Battery", "owner": "Anesco Limited", "state": "west midlands", "country": "uk", "lat": "52.562502", "long": "-1.925062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.562502+-1.925062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Coylton Greener Grid Park", "city": "", "id": "1286", "external_id": "15312", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1286", "external_id": "15312", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "external_id": "15312", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Statkraft UK Limited", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.454634", "long": "-4.266842", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15312", "Record Last Updated (dd/mm/yyyy)": "28/11/2023", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10162", "Address": "Electricity Substation A70 From B730 To U74 Bardarroch Ochiltree ", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256745", "Y-coordinate": "620201", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0580/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454634", "long": "-4.266842", "status": "planning", "mw": 50, "ext_id": "15312"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15312", "Record Last Updated (dd/mm/yyyy)": "28/11/2023", "Operator (or Applicant)": "Statkraft UK Limited", "Site Name": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "10162", "Address": "Electricity Substation A70 From B730 To U74 Bardarroch Ochiltree ", "County": "East Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18", "X-coordinate": "256745", "Y-coordinate": "620201", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0580/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.454634", "long": "-4.266842", "status": "planning", "mw": 50, "ext_id": "15312"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-28", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "name_short": "Coylton\ufffdGreener\ufffdGrid\ufffdPark", "owner": "Statkraft UK Limited", "state": "scotland", "country": "uk", "lat": "55.454634", "long": "-4.266842", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.454634+-4.266842", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Westfield Road, Carlton - Battery Storage", "city": "", "id": "1287", "external_id": "15338", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Firma Vogt Solar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1287", "external_id": "15338", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Westfield Road, Carlton - Battery Storage", "external_id": "15338", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Firma Vogt Solar Limited", "status": "planning", "date_first_heard": "2023-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.740061", "long": "-1.494102", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15338", "Record Last Updated (dd/mm/yyyy)": "01/12/2023", "Operator (or Applicant)": "Firma Vogt Solar Limited", "Site Name": "Westfield Road, Carlton - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "13264", "Address": "Westfield Road Carlton ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF3 3TW", "X-coordinate": "433466", "Y-coordinate": "427194", "Planning Authority": "Leeds Council", "Planning Application Reference": "23/06404/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.740061", "long": "-1.494102", "status": "planning", "mw": 50, "ext_id": "15338"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15338", "Record Last Updated (dd/mm/yyyy)": "01/12/2023", "Operator (or Applicant)": "Firma Vogt Solar Limited", "Site Name": "Westfield Road, Carlton - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "13264", "Address": "Westfield Road Carlton ", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "WF3 3TW", "X-coordinate": "433466", "Y-coordinate": "427194", "Planning Authority": "Leeds Council", "Planning Application Reference": "23/06404/FU", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.740061", "long": "-1.494102", "status": "planning", "mw": 50, "ext_id": "15338"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-01", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Westfield Road, Carlton - Battery Storage", "name_short": "Westfield Road, Carlton", "owner": "Firma Vogt Solar Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.740061", "long": "-1.494102", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.740061+-1.494102", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Midland Road - Battery Energy Storage", "city": "", "id": "1288", "external_id": "15343", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Unknown", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1288", "external_id": "15343", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Midland Road - Battery Energy Storage", "external_id": "15343", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 80, "power_mw": 80, "owner": "Unknown", "status": "planning", "date_first_heard": "2023-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.80334", "long": "-1.757175", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15343", "Record Last Updated (dd/mm/yyyy)": "04/12/2023", "Operator (or Applicant)": "Unknown", "Site Name": "Midland Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Midland Road, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD8 7DY", "X-coordinate": "416090", "Y-coordinate": "434143", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "ECU00002171", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.80334", "long": "-1.757175", "status": "planning", "mw": 80, "ext_id": "15343"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15343", "Record Last Updated (dd/mm/yyyy)": "04/12/2023", "Operator (or Applicant)": "Unknown", "Site Name": "Midland Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "80", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Midland Road, Bradford", "County": "West Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "BD8 7DY", "X-coordinate": "416090", "Y-coordinate": "434143", "Planning Authority": "Bradford Metropolitan District Council", "Planning Application Reference": "ECU00002171", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.80334", "long": "-1.757175", "status": "planning", "mw": 80, "ext_id": "15343"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 80, "mwh_is_estimate": true, "mwh": 80, "mwh_estimate": 80, "status": "planning", "status_class": "", "date_first_heard": "2023-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Midland Road - Battery Energy Storage", "name_short": "Midland Road", "owner": "Unknown", "state": "yorkshire and humber", "country": "uk", "lat": "53.80334", "long": "-1.757175", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.80334+-1.757175", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "city": "", "id": "1289", "external_id": "15375", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1289", "external_id": "15375", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "external_id": "15375", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.710944", "long": "-1.174453", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15375", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lunn Lane Kellington", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0XT", "X-coordinate": "454587", "Y-coordinate": "424152", "Planning Authority": "North Yorkshire Council", "Planning Application Reference": "ZG2023/1179/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.710944", "long": "-1.174453", "status": "planning", "mw": 200, "ext_id": "15375"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15375", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lunn Lane Kellington", "County": "East Riding of Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "DN14 0XT", "X-coordinate": "454587", "Y-coordinate": "424152", "Planning Authority": "North Yorkshire Council", "Planning Application Reference": "ZG2023/1179/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "02/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.710944", "long": "-1.174453", "status": "planning", "mw": 200, "ext_id": "15375"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "name_short": "Corner Of Weeland Road, Lunn Lane", "owner": "Newton Energi Limited", "state": "yorkshire and humber", "country": "uk", "lat": "53.710944", "long": "-1.174453", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.710944+-1.174453", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Newlands Hill Wind Energy Hub", "city": "", "id": "1290", "external_id": "15383", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "136", "power_mw": "136", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1290", "external_id": "15383", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Newlands Hill Wind Energy Hub", "external_id": "15383", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 136, "power_mw": 136, "owner": "Belltown Power Limited", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.873951", "long": "-2.639845", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15383", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Newlands Hill Wind Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12289", "Installed Capacity (MWelec)": "136", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lammermuir Hills, Gifford", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD11 3SP", "X-coordinate": "360062", "Y-coordinate": "664717", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004603", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.873951", "long": "-2.639845", "status": "planning", "mw": 136, "ext_id": "15383"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15383", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Belltown Power Limited", "Site Name": "Newlands Hill Wind Energy Hub", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12289", "Installed Capacity (MWelec)": "136", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Lammermuir Hills, Gifford", "County": "East Lothian", "Region": "Scotland", "Country": "Scotland", "Post Code": "TD11 3SP", "X-coordinate": "360062", "Y-coordinate": "664717", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004603", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.873951", "long": "-2.639845", "status": "planning", "mw": 136, "ext_id": "15383"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 136, "mwh_is_estimate": true, "mwh": 136, "mwh_estimate": 136, "status": "planning", "status_class": "", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Newlands Hill Wind Energy Hub", "name_short": "Newlands Hill Wind Energy Hub", "owner": "Belltown Power Limited", "state": "scotland", "country": "uk", "lat": "55.873951", "long": "-2.639845", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.873951+-2.639845", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ash Tree Solar Farm & Battery Storage", "city": "", "id": "1291", "external_id": "15397", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Low Carbon Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1291", "external_id": "15397", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ash Tree Solar Farm & Battery Storage", "external_id": "15397", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 25, "power_mw": 25, "owner": "Low Carbon Limited", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.911764", "long": "-0.582264", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15397", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Low Carbon Limited", "Site Name": "Ash Tree Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15396", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "High Dike Road Londonthorpe", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG31 9ER", "X-coordinate": "495436", "Y-coordinate": "335867", "Planning Authority": "South Kesteven Council", "Planning Application Reference": "S23/2199", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.911764", "long": "-0.582264", "status": "planning", "mw": 25, "ext_id": "15397"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15397", "Record Last Updated (dd/mm/yyyy)": "03/01/2024", "Operator (or Applicant)": "Low Carbon Limited", "Site Name": "Ash Tree Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15396", "Installed Capacity (MWelec)": "25", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "High Dike Road Londonthorpe", "County": "Lincolnshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG31 9ER", "X-coordinate": "495436", "Y-coordinate": "335867", "Planning Authority": "South Kesteven Council", "Planning Application Reference": "S23/2199", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "29/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.911764", "long": "-0.582264", "status": "planning", "mw": 25, "ext_id": "15397"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-03", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 25, "mwh_is_estimate": true, "mwh": 25, "mwh_estimate": 25, "status": "planning", "status_class": "", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ash Tree Solar Farm & Battery Storage", "name_short": "Ash Tree Solar Farm &", "owner": "Low Carbon Limited", "state": "east midlands", "country": "uk", "lat": "52.911764", "long": "-0.582264", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.911764+-0.582264", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "city": "", "id": "1292", "external_id": "15401", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1292", "external_id": "15401", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "external_id": "15401", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 22, "power_mw": 22, "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "status": "planning", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.051256", "long": "0.463812", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15401", "Record Last Updated (dd/mm/yyyy)": "11/12/2023", "Operator (or Applicant)": "Boultbee Brooks (Renewables Rowley Hill) Limited", "Site Name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15400", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " South Of Sturmer Hall Church Walk Sturmer ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "CB9 7BS", "X-coordinate": "569038", "Y-coordinate": "242072", "Planning Authority": "Braintree Council", "Planning Application Reference": "23/02705/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.051256", "long": "0.463812", "status": "planning", "mw": 22, "ext_id": "15401"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15401", "Record Last Updated (dd/mm/yyyy)": "11/12/2023", "Operator (or Applicant)": "Boultbee Brooks (Renewables Rowley Hill) Limited", "Site Name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15400", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " South Of Sturmer Hall Church Walk Sturmer ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "CB9 7BS", "X-coordinate": "569038", "Y-coordinate": "242072", "Planning Authority": "Braintree Council", "Planning Application Reference": "23/02705/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.051256", "long": "0.463812", "status": "planning", "mw": 22, "ext_id": "15401"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-11", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 22, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "planning", "status_class": "", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "name_short": "Surmer Hall, Church Walk - Solar Fa...", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "state": "eastern", "country": "uk", "lat": "52.051256", "long": "0.463812", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.051256+0.463812", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "city": "", "id": "1293", "external_id": "15417", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1293", "external_id": "15417", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "external_id": "15417", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 22, "power_mw": 22, "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.051256", "long": "0.463812", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15417", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "Boultbee Brooks (Renewables Rowley Hill) Limited", "Site Name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15416", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " South Of Sturmer Hall Church Walk Sturmer ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "CB9 7BS", "X-coordinate": "569038", "Y-coordinate": "242072", "Planning Authority": "Braintree District Council", "Planning Application Reference": "23/02705/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.051256", "long": "0.463812", "status": "planning", "mw": 22, "ext_id": "15417"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15417", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "Boultbee Brooks (Renewables Rowley Hill) Limited", "Site Name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15416", "Installed Capacity (MWelec)": "22", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": " South Of Sturmer Hall Church Walk Sturmer ", "County": "Suffolk", "Region": "Eastern", "Country": "England", "Post Code": "CB9 7BS", "X-coordinate": "569038", "Y-coordinate": "242072", "Planning Authority": "Braintree District Council", "Planning Application Reference": "23/02705/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "01/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.051256", "long": "0.463812", "status": "planning", "mw": 22, "ext_id": "15417"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 22, "mwh_is_estimate": true, "mwh": 22, "mwh_estimate": 22, "status": "planning", "status_class": "", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "name_short": "Surmer Hall, Church Walk - Solar Fa...", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "state": "eastern", "country": "uk", "lat": "52.051256", "long": "0.463812", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.051256+0.463812", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Auchentiber Road - Battery Energy Storage System", "city": "", "id": "1294", "external_id": "15425", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "700", "customer": "", "owner": "Apatura GPC 700 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1294", "external_id": "15425", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Auchentiber Road - Battery Energy Storage System", "external_id": "15425", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 700, "power_mw": 700, "owner": "Apatura GPC 700 Limited", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.906211", "long": "-4.694127", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15425", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "Apatura GPC 700 Limited", "Site Name": "Auchentiber Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "700", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Auchentiber Road, Port Glasgow, Kilmalcolm", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA13 4SP", "X-coordinate": "231683", "Y-coordinate": "671403", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004979", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.906211", "long": "-4.694127", "status": "planning", "mw": 700, "ext_id": "15425"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15425", "Record Last Updated (dd/mm/yyyy)": "12/12/2023", "Operator (or Applicant)": "Apatura GPC 700 Limited", "Site Name": "Auchentiber Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "700", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Auchentiber Road, Port Glasgow, Kilmalcolm", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "PA13 4SP", "X-coordinate": "231683", "Y-coordinate": "671403", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004979", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.906211", "long": "-4.694127", "status": "planning", "mw": 700, "ext_id": "15425"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 700, "mwh_is_estimate": true, "mwh": 700, "mwh_estimate": 700, "status": "planning", "status_class": "", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Auchentiber Road - Battery Energy Storage System", "name_short": "Auchentiber Road - Battery", "owner": "Apatura GPC 700 Limited", "state": "scotland", "country": "uk", "lat": "55.906211", "long": "-4.694127", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.906211+-4.694127", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Burcot Solar Farm", "city": "", "id": "1295", "external_id": "15444", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Ethical Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1295", "external_id": "15444", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Burcot Solar Farm", "external_id": "15444", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Ethical Power", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.666301", "long": "-1.191234", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15444", "Record Last Updated (dd/mm/yyyy)": "18/12/2023", "Operator (or Applicant)": "Ethical Power", "Site Name": "Burcot Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15443", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9374 & 14303", "Address": "Burcot Farm Burcot", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX14 3GW", "X-coordinate": "456032", "Y-coordinate": "196701", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P23/S4132/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.666301", "long": "-1.191234", "status": "planning", "mw": 49, "ext_id": "15444"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15444", "Record Last Updated (dd/mm/yyyy)": "18/12/2023", "Operator (or Applicant)": "Ethical Power", "Site Name": "Burcot Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "15443", "Installed Capacity (MWelec)": "49.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9374 & 14303", "Address": "Burcot Farm Burcot", "County": "Oxfordshire", "Region": "South East", "Country": "England", "Post Code": "OX14 3GW", "X-coordinate": "456032", "Y-coordinate": "196701", "Planning Authority": "South Oxfordshire District Council", "Planning Application Reference": "P23/S4132/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.666301", "long": "-1.191234", "status": "planning", "mw": 49, "ext_id": "15444"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Burcot Solar Farm", "name_short": "Burcot Solar Farm", "owner": "Ethical Power", "state": "south east", "country": "uk", "lat": "51.666301", "long": "-1.191234", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.666301+-1.191234", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "city": "", "id": "1296", "external_id": "15446", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Net Zero Twelve Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1296", "external_id": "15446", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "external_id": "15446", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Net Zero Twelve Limited", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.66622", "long": "-2.094458", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15446", "Record Last Updated (dd/mm/yyyy)": "18/12/2023", "Operator (or Applicant)": "Net Zero Twelve Limited", "Site Name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Upper Latherford Farm Latherford Lane Latherford", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV10 7DX", "X-coordinate": "393709", "Y-coordinate": "307616", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00883/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.66622", "long": "-2.094458", "status": "planning", "mw": 50, "ext_id": "15446"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15446", "Record Last Updated (dd/mm/yyyy)": "18/12/2023", "Operator (or Applicant)": "Net Zero Twelve Limited", "Site Name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Upper Latherford Farm Latherford Lane Latherford", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WV10 7DX", "X-coordinate": "393709", "Y-coordinate": "307616", "Planning Authority": "South Staffordshire Council", "Planning Application Reference": "23/00883/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.66622", "long": "-2.094458", "status": "planning", "mw": 50, "ext_id": "15446"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-18", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "name_short": "Upper Latherford Farm, Latherford L...", "owner": "Net Zero Twelve Limited", "state": "west midlands", "country": "uk", "lat": "52.66622", "long": "-2.094458", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.66622+-2.094458", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Holt Road - Battery Energy Storage", "city": "", "id": "1297", "external_id": "15470", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1297", "external_id": "15470", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holt Road - Battery Energy Storage", "external_id": "15470", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 47, "power_mw": 47, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.850874", "long": "-1.890156", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15470", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Holt Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holt Road, Wimborne", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH21 6SE", "X-coordinate": "407829", "Y-coordinate": "105712", "Planning Authority": "Dorset Council", "Planning Application Reference": "P/FUL/2023/06578", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.850874", "long": "-1.890156", "status": "planning", "mw": 47, "ext_id": "15470"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15470", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Holt Road - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "47.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Holt Road, Wimborne", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH21 6SE", "X-coordinate": "407829", "Y-coordinate": "105712", "Planning Authority": "Dorset Council", "Planning Application Reference": "P/FUL/2023/06578", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "10/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "50.850874", "long": "-1.890156", "status": "planning", "mw": 47, "ext_id": "15470"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 47, "mwh_is_estimate": true, "mwh": 47, "mwh_estimate": 47, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holt Road - Battery Energy Storage", "name_short": "Holt Road", "owner": "EDF Energy Renewables", "state": "south west", "country": "uk", "lat": "50.850874", "long": "-1.890156", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.850874+-1.890156", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Penrhos Works - Battery Energy Storage System", "city": "", "id": "1298", "external_id": "15472", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "Anglesey Land Holdings Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1298", "external_id": "15472", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Penrhos Works - Battery Energy Storage System", "external_id": "15472", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 349, "power_mw": 349, "owner": "Anglesey Land Holdings Limited", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.29477", "long": "-4.596967", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15472", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "Anglesey Land Holdings Limited", "Site Name": "Penrhos Works - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Penrhos Works, Holyhead", "County": "Gwynedd", "Region": "Wales", "Country": "Wales", "Post Code": "LL65 2UX", "X-coordinate": "227015", "Y-coordinate": "380681", "Planning Authority": "Isle of Anglesey County Council", "Planning Application Reference": "OP/2023/8", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.29477", "long": "-4.596967", "status": "planning", "mw": 349, "ext_id": "15472"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15472", "Record Last Updated (dd/mm/yyyy)": "21/12/2023", "Operator (or Applicant)": "Anglesey Land Holdings Limited", "Site Name": "Penrhos Works - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "349", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Penrhos Works, Holyhead", "County": "Gwynedd", "Region": "Wales", "Country": "Wales", "Post Code": "LL65 2UX", "X-coordinate": "227015", "Y-coordinate": "380681", "Planning Authority": "Isle of Anglesey County Council", "Planning Application Reference": "OP/2023/8", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.29477", "long": "-4.596967", "status": "planning", "mw": 349, "ext_id": "15472"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-21", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 349, "mwh_is_estimate": true, "mwh": 349, "mwh_estimate": 349, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Penrhos Works - Battery Energy Storage System", "name_short": "Penrhos Works - Battery", "owner": "Anglesey Land Holdings Limited", "state": "wales", "country": "uk", "lat": "53.29477", "long": "-4.596967", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.29477+-4.596967", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "East Claydon Battery Energy Storage", "city": "", "id": "1299", "external_id": "15501", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1299", "external_id": "15501", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "East Claydon Battery Energy Storage", "external_id": "15501", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 500, "power_mw": 500, "owner": "Statera Energy", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.919985", "long": "-0.902051", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15501", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Statera Energy", "Site Name": "East Claydon Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rookery Farm, Granborough, Buckingham", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "MK18 3NJ", "X-coordinate": "475607", "Y-coordinate": "225176", "Planning Authority": "Buckinghamshire Council - Aylesbury Vale Area", "Planning Application Reference": "23/03875/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.919985", "long": "-0.902051", "status": "planning", "mw": 500, "ext_id": "15501"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15501", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Statera Energy", "Site Name": "East Claydon Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "500", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Rookery Farm, Granborough, Buckingham", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "MK18 3NJ", "X-coordinate": "475607", "Y-coordinate": "225176", "Planning Authority": "Buckinghamshire Council - Aylesbury Vale Area", "Planning Application Reference": "23/03875/APP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.919985", "long": "-0.902051", "status": "planning", "mw": 500, "ext_id": "15501"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 500, "mwh_is_estimate": true, "mwh": 500, "mwh_estimate": 500, "status": "planning", "status_class": "", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "East Claydon Battery Energy Storage", "name_short": "East Claydon", "owner": "Statera Energy", "state": "south east", "country": "uk", "lat": "51.919985", "long": "-0.902051", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.919985+-0.902051", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Brockworth Road - Battery Storage System", "city": "", "id": "1300", "external_id": "15518", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1300", "external_id": "15518", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Brockworth Road - Battery Storage System", "external_id": "15518", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Exagen", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.842689", "long": "-2.161915", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15518", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Exagen", "Site Name": "Brockworth Road - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Brockworth Road, N/O The A417 & E/O M5, Gloucester", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL3 4WN", "X-coordinate": "388942", "Y-coordinate": "216022", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "23/01078/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.842689", "long": "-2.161915", "status": "planning", "mw": 20, "ext_id": "15518"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15518", "Record Last Updated (dd/mm/yyyy)": "04/01/2024", "Operator (or Applicant)": "Exagen", "Site Name": "Brockworth Road - Battery Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "W/O Brockworth Road, N/O The A417 & E/O M5, Gloucester", "County": "Gloucestershire", "Region": "South West", "Country": "England", "Post Code": "GL3 4WN", "X-coordinate": "388942", "Y-coordinate": "216022", "Planning Authority": "Tewkesbury Borough Council", "Planning Application Reference": "23/01078/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "24/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.842689", "long": "-2.161915", "status": "planning", "mw": 20, "ext_id": "15518"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-04", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Brockworth Road - Battery Storage System", "name_short": "Brockworth Road - Battery Storage S...", "owner": "Exagen", "state": "south west", "country": "uk", "lat": "51.842689", "long": "-2.161915", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.842689+-2.161915", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "1301", "external_id": "15544", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "126", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1301", "external_id": "15544", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Derehams Farm, Derehams Lane - Battery Storage", "external_id": "15544", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 126, "power_mw": 126, "owner": "Newton Energi Limited", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15544", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "126", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12649", "Address": "Derehams Farm Derehams Lane Loudwater ", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Buckinghamshire Council - Wycombe Area", "Planning Application Reference": "23/07053/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 126, "ext_id": "15544"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15544", "Record Last Updated (dd/mm/yyyy)": "20/12/2023", "Operator (or Applicant)": "Newton Energi Limited", "Site Name": "Derehams Farm, Derehams Lane - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "126", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "12649", "Address": "Derehams Farm Derehams Lane Loudwater ", "County": "Buckinghamshire", "Region": "South East", "Country": "England", "Post Code": "HP10 9RR", "X-coordinate": "490531", "Y-coordinate": "191093", "Planning Authority": "Buckinghamshire Council - Wycombe Area", "Planning Application Reference": "23/07053/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "15/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.611399", "long": "-0.693977", "status": "planning", "mw": 126, "ext_id": "15544"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 126, "mwh_is_estimate": true, "mwh": 126, "mwh_estimate": 126, "status": "planning", "status_class": "", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Derehams Farm, Derehams Lane - Battery Storage", "name_short": "Derehams Farm, Derehams Lane", "owner": "Newton Energi Limited", "state": "south east", "country": "uk", "lat": "51.611399", "long": "-0.693977", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.611399+-0.693977", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Electricity Substation, Bardarroch - Battery Energy Storage", "city": "", "id": "1302", "external_id": "15569", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1302", "external_id": "15569", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Electricity Substation, Bardarroch - Battery Energy Storage", "external_id": "15569", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 29, "power_mw": 29, "owner": "Balance Power Projects Limited", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.445104", "long": "-4.43125", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15569", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "Electricity Substation, Bardarroch - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Electricity Substation, A70 From B730 To U74 Bardarroch, Ochiltree, Cumnock", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18 2RL", "X-coordinate": "246313", "Y-coordinate": "619492", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0604/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.445104", "long": "-4.43125", "status": "planning", "mw": 29, "ext_id": "15569"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15569", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Balance Power Projects Limited", "Site Name": "Electricity Substation, Bardarroch - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "29.9", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Electricity Substation, A70 From B730 To U74 Bardarroch, Ochiltree, Cumnock", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA18 2RL", "X-coordinate": "246313", "Y-coordinate": "619492", "Planning Authority": "East Ayrshire Council", "Planning Application Reference": "23/0604/PP", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "28/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.445104", "long": "-4.43125", "status": "planning", "mw": 29, "ext_id": "15569"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 29, "mwh_is_estimate": true, "mwh": 29, "mwh_estimate": 29, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Electricity Substation, Bardarroch - Battery Energy Storage", "name_short": "Electricity Substation, Bardarroch", "owner": "Balance Power Projects Limited", "state": "scotland", "country": "uk", "lat": "55.445104", "long": "-4.43125", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.445104+-4.43125", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Toddington Services, Hipsey Spinney - Battery Storage", "city": "", "id": "1303", "external_id": "15573", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "250", "customer": "", "owner": "Kona Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1303", "external_id": "15573", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Toddington Services, Hipsey Spinney - Battery Storage", "external_id": "15573", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 250, "power_mw": 250, "owner": "Kona Energy Limited", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.943939", "long": "-0.501068", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15573", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Kona Energy Limited", "Site Name": "Toddington Services, Hipsey Spinney - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "250", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Toddington Services, W/O The M1 Motorway & E/O Hipsey Spinney, Dunstable", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU5 6HP", "X-coordinate": "503128", "Y-coordinate": "228332", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/23/03787/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.943939", "long": "-0.501068", "status": "planning", "mw": 250, "ext_id": "15573"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15573", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Kona Energy Limited", "Site Name": "Toddington Services, Hipsey Spinney - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "250", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "S/O Toddington Services, W/O The M1 Motorway & E/O Hipsey Spinney, Dunstable", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU5 6HP", "X-coordinate": "503128", "Y-coordinate": "228332", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/23/03787/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.943939", "long": "-0.501068", "status": "planning", "mw": 250, "ext_id": "15573"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 250, "mwh_is_estimate": true, "mwh": 250, "mwh_estimate": 250, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Toddington Services, Hipsey Spinney - Battery Storage", "name_short": "Toddington Services, Hipsey Spinney", "owner": "Kona Energy Limited", "state": "eastern", "country": "uk", "lat": "51.943939", "long": "-0.501068", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.943939+-0.501068", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Caterham Bypass - Battery Energy Storage", "city": "", "id": "1304", "external_id": "15574", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Ylem Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1304", "external_id": "15574", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Caterham Bypass - Battery Energy Storage", "external_id": "15574", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 12, "power_mw": 12, "owner": "Ylem Energy Limited", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.288015", "long": "-0.067535", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15574", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Ylem Energy Limited", "Site Name": "Caterham Bypass - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Caterham Bypass, Caterham", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "CR3 6QW", "X-coordinate": "534854", "Y-coordinate": "156093", "Planning Authority": "Tandridge District Council", "Planning Application Reference": "2023/1430", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.288015", "long": "-0.067535", "status": "planning", "mw": 12, "ext_id": "15574"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15574", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Ylem Energy Limited", "Site Name": "Caterham Bypass - Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "12", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Caterham Bypass, Caterham", "County": "Surrey", "Region": "South East", "Country": "England", "Post Code": "CR3 6QW", "X-coordinate": "534854", "Y-coordinate": "156093", "Planning Authority": "Tandridge District Council", "Planning Application Reference": "2023/1430", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "27/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.288015", "long": "-0.067535", "status": "planning", "mw": 12, "ext_id": "15574"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 12, "mwh_is_estimate": true, "mwh": 12, "mwh_estimate": 12, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Caterham Bypass - Battery Energy Storage", "name_short": "Caterham Bypass", "owner": "Ylem Energy Limited", "state": "south east", "country": "uk", "lat": "51.288015", "long": "-0.067535", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.288015+-0.067535", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "city": "", "id": "1305", "external_id": "15599", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Windel Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1305", "external_id": "15599", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "external_id": "15599", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Windel Energy", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "54.965523", "long": "-2.96815", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15599", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Windel Energy", "Site Name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ne/O Pine Glen, Westlinton, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 6AL", "X-coordinate": "338113", "Y-coordinate": "563862", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0833", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.965523", "long": "-2.96815", "status": "planning", "mw": 200, "ext_id": "15599"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15599", "Record Last Updated (dd/mm/yyyy)": "12/01/2024", "Operator (or Applicant)": "Windel Energy", "Site Name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ne/O Pine Glen, Westlinton, Carlisle", "County": "Cumbria", "Region": "North West", "Country": "England", "Post Code": "CA6 6AL", "X-coordinate": "338113", "Y-coordinate": "563862", "Planning Authority": "Carlisle City Council", "Planning Application Reference": "23/0833", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "05/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "54.965523", "long": "-2.96815", "status": "planning", "mw": 200, "ext_id": "15599"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "name_short": "Todhills and Westlinton - Harker Ba...", "owner": "Windel Energy", "state": "north west", "country": "uk", "lat": "54.965523", "long": "-2.96815", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.965523+-2.96815", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ipswich Road Cardiff - Battery Storage", "city": "", "id": "1306", "external_id": "15610", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "93", "power_mw": "93", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1306", "external_id": "15610", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ipswich Road, Cardiff - Battery Storage ", "external_id": "15610", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 93, "power_mw": 93, "owner": "Green Frog Power 214 Limited", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.498785", "long": "-3.145501", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "15610", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Ipswich Road, Cardiff - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "93", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9910", "Address": "First Choice Accident Repair, Ipswich Road, Penylan, Cardiff", "County": "South Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF23 9AQ", "X-coordinate": "320581", "Y-coordinate": "178383", "Planning Authority": "Cardiff Council", "Planning Application Reference": "23/02817/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.498785", "long": "-3.145501", "status": "planning", "mw": 93, "ext_id": "15610"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "15610", "Record Last Updated (dd/mm/yyyy)": "15/01/2024", "Operator (or Applicant)": "Green Frog Power 214 Limited", "Site Name": "Ipswich Road, Cardiff - Battery Storage ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "93", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "9910", "Address": "First Choice Accident Repair, Ipswich Road, Penylan, Cardiff", "County": "South Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF23 9AQ", "X-coordinate": "320581", "Y-coordinate": "178383", "Planning Authority": "Cardiff Council", "Planning Application Reference": "23/02817/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/12/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.498785", "long": "-3.145501", "status": "planning", "mw": 93, "ext_id": "15610"}, "current_month": "2024-01", "dates": {"first_heard": "2024-01-15", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 93, "mwh_is_estimate": true, "mwh": 93, "mwh_estimate": 93, "status": "planning", "status_class": "", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ipswich Road, Cardiff - Battery Storage ", "name_short": "Ipswich Road, Cardiff - Battery Sto...", "owner": "Green Frog Power 214 Limited", "state": "wales", "country": "uk", "lat": "51.498785", "long": "-3.145501", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.498785+-3.145501", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Rye Common Lane", "city": "", "id": "1375", "external_id": "7028", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1375", "external_id": "7028", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rye Common Lane", "external_id": "7028", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.249851", "long": "-0.875513", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7028", "Record Last Updated (dd/mm/yyyy)": "14/09/2023", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Rye Common Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7737", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blue Bell Lodge, Rye Common Lane, Crondall, Farnham, Surrey", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DE", "X-coordinate": "478578", "Y-coordinate": "150676", "Planning Authority": "Hart District Council", "Planning Application Reference": "18/01114/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2018", "Planning Application Withdrawn": "30/08/2018", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.249851", "long": "-0.875513", "status": "planning", "mw": 49, "ext_id": "7028"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "7028", "Record Last Updated (dd/mm/yyyy)": "14/09/2023", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Rye Common Lane", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "7737", "Are they re-applying (Old REPD Ref) ": "", "Address": "Blue Bell Lodge, Rye Common Lane, Crondall, Farnham, Surrey", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DE", "X-coordinate": "478578", "Y-coordinate": "150676", "Planning Authority": "Hart District Council", "Planning Application Reference": "18/01114/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2018", "Planning Application Withdrawn": "30/08/2018", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.249851", "long": "-0.875513", "status": "planning", "mw": 49, "ext_id": "7028"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-14", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Rye Common Lane", "name_short": "Rye Common Lane", "owner": "Harmony Energy", "state": "south east", "country": "uk", "lat": "51.249851", "long": "-0.875513", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.249851+-0.875513", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Pancross & Oaklands Solar Farm", "city": "", "id": "1376", "external_id": "7702", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Sirius Renewable Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1376", "external_id": "7702", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pancross & Oaklands Solar Farm", "external_id": "7702", "state": "wales", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Sirius Renewable Energy", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.452175", "long": "-3.353404", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7702", "Record Last Updated (dd/mm/yyyy)": "20/09/2022", "Operator (or Applicant)": "Sirius Renewable Energy", "Site Name": "Pancross & Oaklands Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7701", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Pancross and Oaklands Farm, near Bonvilston,", "County": "Vale of Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF5 6TQ", "X-coordinate": "306054", "Y-coordinate": "173446", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3245504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.452175", "long": "-3.353404", "status": "planning", "mw": 50, "ext_id": "7702"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "7702", "Record Last Updated (dd/mm/yyyy)": "20/09/2022", "Operator (or Applicant)": "Sirius Renewable Energy", "Site Name": "Pancross & Oaklands Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "7701", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Pancross and Oaklands Farm, near Bonvilston,", "County": "Vale of Glamorgan", "Region": "Wales", "Country": "Wales", "Post Code": "CF5 6TQ", "X-coordinate": "306054", "Y-coordinate": "173446", "Planning Authority": "Welsh Government (NSIP)", "Planning Application Reference": "DNS/3245504", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "04/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.452175", "long": "-3.353404", "status": "planning", "mw": 50, "ext_id": "7702"}, "current_month": "2024-01", "dates": {"first_heard": "2022-09-20", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Pancross & Oaklands Solar Farm", "name_short": "Pancross & Oaklands Solar Farm", "owner": "Sirius Renewable Energy", "state": "wales", "country": "uk", "lat": "51.452175", "long": "-3.353404", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.452175+-3.353404", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Carlisle Road - Battery Energy Storage System", "city": "", "id": "1377", "external_id": "9684", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1377", "external_id": "9684", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Carlisle Road - Battery Energy Storage System", "external_id": "9684", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Zenobe Energy", "status": "planning", "date_first_heard": "2021-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.59267", "long": "-3.889471", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9684", "Record Last Updated (dd/mm/yyyy)": "23/09/2021", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Carlisle Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coalburn Battery Energy Storage System, Adj Carlisle Road, B7078, Coalburn, Lanark", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0LS", "X-coordinate": "281024", "Y-coordinate": "634847", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004799", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.59267", "long": "-3.889471", "status": "planning", "mw": 200, "ext_id": "9684"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9684", "Record Last Updated (dd/mm/yyyy)": "23/09/2021", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Carlisle Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Coalburn Battery Energy Storage System, Adj Carlisle Road, B7078, Coalburn, Lanark", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "ML11 0LS", "X-coordinate": "281024", "Y-coordinate": "634847", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004799", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "07/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.59267", "long": "-3.889471", "status": "planning", "mw": 200, "ext_id": "9684"}, "current_month": "2024-01", "dates": {"first_heard": "2021-09-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": true, "mwh": 200, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2021-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Carlisle Road - Battery Energy Storage System", "name_short": "Carlisle Road - Battery", "owner": "Zenobe Energy", "state": "scotland", "country": "uk", "lat": "55.59267", "long": "-3.889471", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.59267+-3.889471", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Chapel Lane - Battery Energy Storage System", "city": "", "id": "1378", "external_id": "9721", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1378", "external_id": "9721", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chapel Lane - Battery Energy Storage System", "external_id": "9721", "state": "west midlands", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Anesco Limited", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.562502", "long": "-1.925062", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9721", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Chapel Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15308", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj The Duckery, Chapel Lane, Great Barr, Walsall", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS9 0QU", "X-coordinate": "405177", "Y-coordinate": "296077", "Planning Authority": "Walsall Metropolitan Borough Council", "Planning Application Reference": "21/1720", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "13/12/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.562502", "long": "-1.925062", "status": "planning", "mw": 49, "ext_id": "9721"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9721", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "Anesco Limited", "Site Name": "Chapel Lane - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.35", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Revised", "Development Status (short)": "Revised", "Are they re-applying (New REPD Ref)": "15308", "Are they re-applying (Old REPD Ref) ": "", "Address": "Adj The Duckery, Chapel Lane, Great Barr, Walsall", "County": "West Midlands", "Region": "West Midlands", "Country": "England", "Post Code": "WS9 0QU", "X-coordinate": "405177", "Y-coordinate": "296077", "Planning Authority": "Walsall Metropolitan Borough Council", "Planning Application Reference": "21/1720", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/12/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "13/12/2022", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.562502", "long": "-1.925062", "status": "planning", "mw": 49, "ext_id": "9721"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chapel Lane - Battery Energy Storage System", "name_short": "Chapel Lane - Battery", "owner": "Anesco Limited", "state": "west midlands", "country": "uk", "lat": "52.562502", "long": "-1.925062", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.562502+-1.925062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Glenniston Farm, Auchtertool - Solar Farm", "city": "", "id": "1380", "external_id": "10434", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Locogen Consulting Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1380", "external_id": "10434", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Glenniston Farm, Auchtertool - Solar Farm", "external_id": "10434", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Locogen Consulting Limited", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10434", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Locogen Consulting Limited", "Site Name": "Glenniston Farm, Auchtertool - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10433", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Glenniston Farm Gleniston Auchtertool Lochgelly", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "23/02598/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 10, "ext_id": "10434"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10434", "Record Last Updated (dd/mm/yyyy)": "24/01/2022", "Operator (or Applicant)": "Locogen Consulting Limited", "Site Name": "Glenniston Farm, Auchtertool - Solar Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10433", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Glenniston Farm Gleniston Auchtertool Lochgelly", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "23/02598/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 10, "ext_id": "10434"}, "current_month": "2024-01", "dates": {"first_heard": "2022-01-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Glenniston Farm, Auchtertool - Solar Farm", "name_short": "Glenniston Farm, Auchtertool - Sola...", "owner": "Locogen Consulting Limited", "state": "scotland", "country": "uk", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.11287+-3.271262", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Culachy Wind Farm", "city": "", "id": "1381", "external_id": "10714", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Fred Olsen Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1381", "external_id": "10714", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Culachy Wind Farm", "external_id": "10714", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 10, "power_mw": 10, "owner": "Fred Olsen Renewables Limited", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.138992", "long": "-4.661529", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10714", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Fred Olsen Renewables Limited", "Site Name": "Culachy Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10713", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "3926", "Address": "6.5km S/O Fort Augustus", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH32 4BZ", "X-coordinate": "239039", "Y-coordinate": "808487", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003423", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.138992", "long": "-4.661529", "status": "planning", "mw": 10, "ext_id": "10714"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10714", "Record Last Updated (dd/mm/yyyy)": "06/12/2023", "Operator (or Applicant)": "Fred Olsen Renewables Limited", "Site Name": "Culachy Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "10713", "Installed Capacity (MWelec)": "10", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "3926", "Address": "6.5km S/O Fort Augustus", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "PH32 4BZ", "X-coordinate": "239039", "Y-coordinate": "808487", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00003423", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.138992", "long": "-4.661529", "status": "planning", "mw": 10, "ext_id": "10714"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 10, "mwh_is_estimate": true, "mwh": 10, "mwh_estimate": 10, "status": "planning", "status_class": "", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Culachy Wind Farm", "name_short": "Culachy Wind Farm", "owner": "Fred Olsen Renewables Limited", "state": "scotland", "country": "uk", "lat": "57.138992", "long": "-4.661529", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.138992+-4.661529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Printworks Road - Stalybridge Battery Storage", "city": "", "id": "1382", "external_id": "10808", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1382", "external_id": "10808", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Printworks Road - Stalybridge Battery Storage", "external_id": "10808", "state": "north west", "country": "uk", "mwh": 0, "estimate_mwh": 150, "power_mw": 150, "owner": "Zenobe Energy", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.494465", "long": "-2.043372", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10808", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Printworks Road - Stalybridge Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Stalybridge Substation Printworks Road Stalybridge ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK15 3BD", "X-coordinate": "397220", "Y-coordinate": "399752", "Planning Authority": "Tameside Metropolitan Borough", "Planning Application Reference": "23/00770/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.494465", "long": "-2.043372", "status": "planning", "mw": 150, "ext_id": "10808"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "10808", "Record Last Updated (dd/mm/yyyy)": "19/12/2023", "Operator (or Applicant)": "Zenobe Energy", "Site Name": "Printworks Road - Stalybridge Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "150", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "South Of Stalybridge Substation Printworks Road Stalybridge ", "County": "Cheshire", "Region": "North West", "Country": "England", "Post Code": "SK15 3BD", "X-coordinate": "397220", "Y-coordinate": "399752", "Planning Authority": "Tameside Metropolitan Borough", "Planning Application Reference": "23/00770/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "11/09/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "15/12/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "15/12/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.494465", "long": "-2.043372", "status": "planning", "mw": 150, "ext_id": "10808"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-19", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 150, "mwh_is_estimate": true, "mwh": 150, "mwh_estimate": 150, "status": "planning", "status_class": "", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Printworks Road - Stalybridge Battery Storage", "name_short": "Printworks Road - Stalybridge", "owner": "Zenobe Energy", "state": "north west", "country": "uk", "lat": "53.494465", "long": "-2.043372", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.494465+-2.043372", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Watten Wind Farm", "city": "", "id": "1383", "external_id": "11480", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1383", "external_id": "11480", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Watten Wind Farm", "external_id": "11480", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "EDF Energy Renewables", "status": "planning", "date_first_heard": "2022-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "58.470559", "long": "-3.30353", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11480", "Record Last Updated (dd/mm/yyyy)": "17/06/2022", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Watten Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11479", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O Watten, Caithness", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW1 5YL", "X-coordinate": "324063", "Y-coordinate": "954328", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00004509", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.470559", "long": "-3.30353", "status": "planning", "mw": 20, "ext_id": "11480"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11480", "Record Last Updated (dd/mm/yyyy)": "17/06/2022", "Operator (or Applicant)": "EDF Energy Renewables", "Site Name": "Watten Wind Farm", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11479", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Sw/O Watten, Caithness", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "KW1 5YL", "X-coordinate": "324063", "Y-coordinate": "954328", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": " ECU00004509", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "14/08/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "58.470559", "long": "-3.30353", "status": "planning", "mw": 20, "ext_id": "11480"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-17", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2022-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Watten Wind Farm", "name_short": "Watten Wind Farm", "owner": "EDF Energy Renewables", "state": "scotland", "country": "uk", "lat": "58.470559", "long": "-3.30353", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:58.470559+-3.30353", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Ben Aketil Wind Farm - Repowered & Extended", "city": "", "id": "1384", "external_id": "11876", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Falck Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1384", "external_id": "11876", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Ben Aketil Wind Farm - Repowered & Extended", "external_id": "11876", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 20, "power_mw": 20, "owner": "Falck Renewables Limited", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.148168", "long": "-6.104436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11876", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Falck Renewables Limited", "Site Name": "Ben Aketil Wind Farm - Repowered & Extended", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11875", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ben Aketil, Dunvegan, Isle of Skye", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV49 9BJ", "X-coordinate": "151835", "Y-coordinate": "813841", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004552", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.148168", "long": "-6.104436", "status": "planning", "mw": 20, "ext_id": "11876"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11876", "Record Last Updated (dd/mm/yyyy)": "10/08/2023", "Operator (or Applicant)": "Falck Renewables Limited", "Site Name": "Ben Aketil Wind Farm - Repowered & Extended", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11875", "Installed Capacity (MWelec)": "20", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Ben Aketil, Dunvegan, Isle of Skye", "County": "Highland", "Region": "Scotland", "Country": "Scotland", "Post Code": "IV49 9BJ", "X-coordinate": "151835", "Y-coordinate": "813841", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004552", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "09/06/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.148168", "long": "-6.104436", "status": "planning", "mw": 20, "ext_id": "11876"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-10", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 20, "mwh_is_estimate": true, "mwh": 20, "mwh_estimate": 20, "status": "planning", "status_class": "", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ben Aketil Wind Farm - Repowered & Extended", "name_short": "Ben Aketil Wind Farm - Repowered & ...", "owner": "Falck Renewables Limited", "state": "scotland", "country": "uk", "lat": "57.148168", "long": "-6.104436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.148168+-6.104436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "city": "", "id": "1385", "external_id": "11999", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Assured Asset Solar 2 Limited (Peridot Solar)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1385", "external_id": "11999", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "external_id": "11999", "state": "east midlands", "country": "uk", "mwh": 0, "estimate_mwh": 50, "power_mw": 50, "owner": "Assured Asset Solar 2 Limited (Peridot Solar)", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.093458", "long": "-0.846868", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11999", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Assured Asset Solar 2 Limited (Peridot Solar)", "Site Name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11998", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The W/O Main Street, Kelham, Newark", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG23 5QP", "X-coordinate": "477318", "Y-coordinate": "355760", "Planning Authority": "Newark & Sherwood District Council", "Planning Application Reference": "23/01837/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.093458", "long": "-0.846868", "status": "planning", "mw": 50, "ext_id": "11999"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "11999", "Record Last Updated (dd/mm/yyyy)": "30/10/2023", "Operator (or Applicant)": "Assured Asset Solar 2 Limited (Peridot Solar)", "Site Name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "11998", "Installed Capacity (MWelec)": "50", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "The W/O Main Street, Kelham, Newark", "County": "Nottinghamshire", "Region": "East Midlands", "Country": "England", "Post Code": "NG23 5QP", "X-coordinate": "477318", "Y-coordinate": "355760", "Planning Authority": "Newark & Sherwood District Council", "Planning Application Reference": "23/01837/FULM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/10/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.093458", "long": "-0.846868", "status": "planning", "mw": 50, "ext_id": "11999"}, "current_month": "2024-01", "dates": {"first_heard": "2023-10-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 50, "mwh_is_estimate": true, "mwh": 50, "mwh_estimate": 50, "status": "planning", "status_class": "", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "name_short": "Main Street, Kelham - Solar Farm &", "owner": "Assured Asset Solar 2 Limited (Peridot Solar)", "state": "east midlands", "country": "uk", "lat": "53.093458", "long": "-0.846868", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.093458+-0.846868", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "city": "", "id": "1386", "external_id": "12024", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Resources Unlimited LLP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1386", "external_id": "12024", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "external_id": "12024", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 60, "power_mw": 60, "owner": "Resources Unlimited LLP", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.808132", "long": "-4.369304", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12024", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Resources Unlimited LLP", "Site Name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60.8", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Saturland Farm, 168 Salterland Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G78 1TF", "X-coordinate": "251610", "Y-coordinate": "659747", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004590", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.808132", "long": "-4.369304", "status": "planning", "mw": 60, "ext_id": "12024"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12024", "Record Last Updated (dd/mm/yyyy)": "07/12/2023", "Operator (or Applicant)": "Resources Unlimited LLP", "Site Name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "60.8", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Saturland Farm, 168 Salterland Road, Glasgow", "County": "Strathclyde", "Region": "Scotland", "Country": "Scotland", "Post Code": "G78 1TF", "X-coordinate": "251610", "Y-coordinate": "659747", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004590", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "17/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.808132", "long": "-4.369304", "status": "planning", "mw": 60, "ext_id": "12024"}, "current_month": "2024-01", "dates": {"first_heard": "2023-12-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 60, "mwh_is_estimate": true, "mwh": 60, "mwh_estimate": 60, "status": "planning", "status_class": "", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "name_short": "Saturland Farm, Salterland Road - B...", "owner": "Resources Unlimited LLP", "state": "scotland", "country": "uk", "lat": "55.808132", "long": "-4.369304", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.808132+-4.369304", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "city": "", "id": "1387", "external_id": "12026", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1387", "external_id": "12026", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "external_id": "12026", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 100, "power_mw": 100, "owner": "RES Limited", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "57.064168", "long": "-2.477187", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12026", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "RES Limited", "Site Name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12025", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hill of Fare, Banchory", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB31 5DA", "X-coordinate": "371160", "Y-coordinate": "797115", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004592", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.064168", "long": "-2.477187", "status": "planning", "mw": 100, "ext_id": "12026"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12026", "Record Last Updated (dd/mm/yyyy)": "24/11/2023", "Operator (or Applicant)": "RES Limited", "Site Name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12025", "Installed Capacity (MWelec)": "100", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Hill of Fare, Banchory", "County": "Grampian", "Region": "Scotland", "Country": "Scotland", "Post Code": "AB31 5DA", "X-coordinate": "371160", "Y-coordinate": "797115", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004592", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/11/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "57.064168", "long": "-2.477187", "status": "planning", "mw": 100, "ext_id": "12026"}, "current_month": "2024-01", "dates": {"first_heard": "2023-11-24", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 100, "mwh_is_estimate": true, "mwh": 100, "mwh_estimate": 100, "status": "planning", "status_class": "", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "name_short": "Hill of Fare - Hill of Fare Wind Fa...", "owner": "RES Limited", "state": "scotland", "country": "uk", "lat": "57.064168", "long": "-2.477187", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:57.064168+-2.477187", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Loch Fergus Farm - Energy Storage System", "city": "", "id": "1388", "external_id": "12274", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Locogen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1388", "external_id": "12274", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Loch Fergus Farm - Energy Storage System", "external_id": "12274", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 45, "power_mw": 45, "owner": "Locogen", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "55.433174", "long": "-4.544446", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12274", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": "Locogen", "Site Name": "Loch Fergus Farm - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12273", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Loch Fergus Farm", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 6ER", "X-coordinate": "239106", "Y-coordinate": "618421", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.433174", "long": "-4.544446", "status": "planning", "mw": 45, "ext_id": "12274"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12274", "Record Last Updated (dd/mm/yyyy)": "12/09/2023", "Operator (or Applicant)": "Locogen", "Site Name": "Loch Fergus Farm - Energy Storage System", "Technology Type": "Battery", "Storage Type": "Co-located with RE", "Storage Co-location REPD Ref ID": "12273", "Installed Capacity (MWelec)": "45", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Loch Fergus Farm", "County": "Ayrshire", "Region": "Scotland", "Country": "Scotland", "Post Code": "KA6 6ER", "X-coordinate": "239106", "Y-coordinate": "618421", "Planning Authority": "Scottish Government (S36)", "Planning Application Reference": "ECU00004855", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "03/07/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "55.433174", "long": "-4.544446", "status": "planning", "mw": 45, "ext_id": "12274"}, "current_month": "2024-01", "dates": {"first_heard": "2023-09-12", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 45, "mwh_is_estimate": true, "mwh": 45, "mwh_estimate": 45, "status": "planning", "status_class": "", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Loch Fergus Farm - Energy Storage System", "name_short": "Loch Fergus Farm", "owner": "Locogen", "state": "scotland", "country": "uk", "lat": "55.433174", "long": "-4.544446", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.433174+-4.544446", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "city": "", "id": "1389", "external_id": "12350", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Relay Balbeggie Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "1389", "external_id": "12350", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "external_id": "12350", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Relay Balbeggie Limited", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.15179", "long": "-3.158397", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "12350", "Record Last Updated (dd/mm/yyyy)": "30/08/2023", "Operator (or Applicant)": "Relay Balbeggie Limited", "Site Name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "300M East Of Wester Balbeggie Cottages Wester Balbeggie Farm Balbeggie Avenue Balbeggie Thornton", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1 3NS", "X-coordinate": "328135", "Y-coordinate": "696060", "Planning Authority": "Fife Council", "Planning Application Reference": "23/00701/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.15179", "long": "-3.158397", "status": "planning", "mw": 49, "ext_id": "12350"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "12350", "Record Last Updated (dd/mm/yyyy)": "30/08/2023", "Operator (or Applicant)": "Relay Balbeggie Limited", "Site Name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "300M East Of Wester Balbeggie Cottages Wester Balbeggie Farm Balbeggie Avenue Balbeggie Thornton", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY1 3NS", "X-coordinate": "328135", "Y-coordinate": "696060", "Planning Authority": "Fife Council", "Planning Application Reference": "23/00701/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2023", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/08/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/08/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.15179", "long": "-3.158397", "status": "planning", "mw": 49, "ext_id": "12350"}, "current_month": "2024-01", "dates": {"first_heard": "2023-08-30", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": true, "mwh": 49, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "name_short": "Wester Balbeggie Farm, Balbeggie Av...", "owner": "Relay Balbeggie Limited", "state": "scotland", "country": "uk", "lat": "56.15179", "long": "-3.158397", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.15179+-3.158397", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": [], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": false, "is_megapack": false}, {"csv": {"name": "Supernode Stage 1", "city": "brisbane", "id": "1390", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "520", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.318405", "long": "152.969631", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "link2": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link3": "https://x.com/FredericLambert/status/1811399467070894094", "link4": ""}, "internal_id": "1390", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 520, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Supernode Stage 1", "name_short": "Supernode Stage 1", "owner": "Quinbrook", "state": "queensland", "country": "australia", "lat": "-27.318405", "long": "152.969631", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.318405+152.969631", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer"], "links": ["https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "https://x.com/FredericLambert/status/1811399467070894094"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Supernode Stage 2", "city": "brisbane", "id": "1391", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "1040", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.320103", "long": "152.970537", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link2": "https://x.com/FredericLambert/status/1811399467070894094", "link3": "", "link4": ""}, "internal_id": "1391", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 1040, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Supernode Stage 2", "name_short": "Supernode Stage 2", "owner": "Quinbrook", "state": "queensland", "country": "australia", "lat": "-27.320103", "long": "152.970537", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.320103+152.970537", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer"], "links": ["https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "https://x.com/FredericLambert/status/1811399467070894094"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}]; generateBatteryList(5, 2, 3, '#projects-table'); generateBatteryMap(projects, 'mapid'); diff --git a/docs/index.html b/docs/index.html index 7720db6b..2b4be554 100644 --- a/docs/index.html +++ b/docs/index.html @@ -29,7 +29,7 @@ - Megapack Tracker (83) + Megapack Tracker (84) @@ -100,13 +100,13 @@

Megapack tracker

Projects count 50 14 - 19 + 20 πŸ”‹ Battery capacity (GWh) 7.1 8.8 - 8.6 + 8.8 @@ -1753,6 +1753,36 @@

Megapack list

+ + +
+ Glenbrook + Glenbrook + + + + πŸ‡³πŸ‡Ώ + new zealand + + + + 200 + 100 + planning + 0 ~ 2026Q1 + + + Contact Energy + + + + 1397 + + πŸ‘€ + + + @@ -2974,7 +3004,7 @@

Contact & Contribute

This page is not affiliated, associated, endorsed by or in any way officially connected with Tesla, Inc.
- Website was generated on: 2024-07-15 15:01 UTC + Website was generated on: 2024-07-15 15:24 UTC
@@ -3023,7 +3053,7 @@

Contact & Contribute

// var projects = ''; // projects = JSON.parse(projects) // could also have the json as static file and load it here... - var projects = [{"csv": {"name": "Sendai", "city": "sendai", "id": "1374", "external_id": "", "state": "miyagi", "country": "japan", "capacity_mwh": "43", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Kenes", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "14", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.271948", "long": "140.833529", "coords_hint": "3", "use_case": "", "notes": "guessed the mw, assuming it is a 4h system", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1802738958679285856", "link2": "", "link3": "", "link4": ""}, "internal_id": "1374", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 11, "mwh_is_estimate": false, "mwh": 43, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "month_disappeared": "", "go_live": "2024-06", "go_live_year_int": 2024, "name": "Sendai", "name_short": "Sendai", "owner": "Kenes", "state": "miyagi", "country": "japan", "lat": "38.271948", "long": "140.833529", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.271948+140.833529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 14, "notes_split": ["guessed the mw, assuming it is a 4h system"], "links": ["https://x.com/Tesla_Megapack/status/1802738958679285856"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Clay Tye", "city": "Upminster", "id": "76", "external_id": "", "state": "essex", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures (FRV)", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552193", "long": "0.297889", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "link2": "https://x.com/Tesla_Megapack/status/1775254497973202985", "link3": "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/", "link4": ""}, "internal_id": "76", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 99, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Clay Tye", "name_short": "Clay Tye", "owner": "", "state": "essex", "country": "uk", "lat": "51.552193", "long": "0.297889", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.552193+0.297889", "construction_time_month": 30, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "https://x.com/Tesla_Megapack/status/1775254497973202985", "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Jamesfield Farm", "city": "Abernethy", "id": "130", "external_id": "10863", "state": "fife", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "Tag Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "26", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://www.harmonyenergyplanning.co.uk/jamesfield/", "link3": "", "link4": ""}, "internal_id": "130", "external_id": "10863", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Jamesfield Organic Centre - Battery Storage", "external_id": "10863", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "construction", "date_first_heard": "2022-09-28", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10863", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7315 & 10456", "Address": "140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/00832/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "planning", "mw": 49, "ext_id": "10863"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2022", "to": "12/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2025", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "28/09/2025", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2023", "to": "24/03/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10863", "Record Last Updated (dd/mm/yyyy)": "24/03/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7315 & 10456", "Address": "140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/00832/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "construction", "mw": 49, "ext_id": "10863"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-07", "start_construction": "2023-01-12", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09-28", "start_construction": "2023-01-01", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Jamesfield Organic Centre - Battery Storage", "name_short": "Jamesfield Organic Centre", "owner": "Harmony Energy Storage", "state": "scotland", "country": "uk", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.347678+-3.298351", "construction_time_month": 14, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 26, "notes_split": ["extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article"], "links": ["https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "https://www.harmonyenergyplanning.co.uk/jamesfield/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Kogan Creek / Chinchilla", "city": "", "id": "691", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "CS Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "80", "status": "operation", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "cost_million": "150", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-26.917756", "long": "150.746113", "coords_hint": "2", "use_case": "", "notes": "used day of tweet as operation start date", "project_website": "", "link1": "https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "link2": "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "link3": "https://twitter.com/SawyerMerritt/status/1764791615061668146", "link4": ""}, "internal_id": "691", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Kogan Creek / Chinchilla", "name_short": "Kogan Creek / Chinchilla", "owner": "", "state": "queensland", "country": "australia", "lat": "-26.917756", "long": "150.746113", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-26.917756+150.746113", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 80, "notes_split": ["used day of tweet as operation start date"], "links": ["https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "https://twitter.com/SawyerMerritt/status/1764791615061668146"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "EReserve 1-9 (9 different locations)", "city": "", "id": "13", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "315", "estimate_mwh": "", "power_mw": "180", "customer": "WCSB Power", "owner": "Enfinite", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "55.740245", "long": "-118.700003", "coords_hint": "1", "use_case": "", "notes": "eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ** the mwh number is from the twitter post", "project_website": "https://ereserve-project.com/", "link1": "http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "link2": "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "link3": "https://x.com/Tesla_Megapack/status/1781467958218469840", "link4": "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"}, "internal_id": "13", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 180, "mwh_is_estimate": false, "mwh": 315, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "month_disappeared": "", "go_live": "2024-02", "go_live_year_int": 2024, "name": "EReserve 1-9 (9 different locations)", "name_short": "EReserve 1-9 (9 different locations...", "owner": "Enfinite", "state": "alberta", "country": "canada", "lat": "55.740245", "long": "-118.700003", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.740245+-118.700003", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ", " the mwh number is from the twitter post"], "links": ["http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "https://x.com/Tesla_Megapack/status/1781467958218469840", "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Goleta Energy Storage Project", "city": "Goleta", "id": "34", "external_id": "66394", "state": "california", "country": "usa", "capacity_mwh": "160", "estimate_mwh": "", "power_mw": "60", "customer": "Goleta Energy Storage, LLC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "62", "status": "operation", "date_first_heard": "2019-11-13", "start_construction": "", "start_operation": "2023-12-05", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.43274", "long": "-119.869283", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "the planning document on the website has a lot of detail", "project_website": "https://www.cityofgoleta.org/city-hall/planning-and-environmental-review/ceqa-review/cortona-battery-storage-project", "link1": "https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2", "link2": "", "link3": "", "link4": ""}, "internal_id": "34", "external_id": "66394", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Goleta Energy Storage, LLC", "external_id": "66394", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Goleta Energy Storage, LLC", "status": "operation", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GOLET": {"first": {"year": "2023", "month": "4", "entity id": "65479", "entity name": "Goleta Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Goleta Energy Storage, LLC", "plant state": "CA", "plant id": "66394", "generator id": "GOLET", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66394", "date": "2023-04", "mw": 60}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-04", "to": "2023-10", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "1", "entity id": "65479", "entity name": "Goleta Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Goleta Energy Storage, LLC", "plant state": "CA", "plant id": "66394", "generator id": "GOLET", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66394", "date": "2024-01", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": false, "mwh": 160, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Goleta Energy Storage, LLC", "name_short": "Goleta Energy Storage", "owner": "Goleta Energy Storage, LLC", "state": "california", "country": "usa", "lat": "34.43274", "long": "-119.869283", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.43274+-119.869283", "construction_time_month": 6, "construction_speed_mwh_per_month": 26, "no_of_battery_units": 62, "notes_split": ["the planning document on the website has a lot of detail"], "links": ["https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Kapolei Energy Storage", "city": "", "id": "1", "external_id": "66067", "state": "hawaii", "country": "usa", "capacity_mwh": "565", "estimate_mwh": "", "power_mw": "185", "customer": "Hawaiian Electric", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "158", "status": "operation", "date_first_heard": "", "start_construction": "2021-08-25", "start_operation": "2024-01-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.328169", "long": "-158.105085", "coords_hint": "1", "use_case": "island, black start", "notes": "", "project_website": "https://www.kapoleienergystorage.com/overview", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "link2": "https://twitter.com/Tesla_Megapack/status/1745499330612748482", "link3": "", "link4": ""}, "internal_id": "1", "external_id": "66067", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kapolei Energy Storage", "external_id": "66067", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "Kapolei Energy Storage I, LLC", "status": "operation", "date_first_heard": "2023-01", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KES1": {"first": {"year": "2023", "month": "5", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Kapolei Energy Storage", "plant state": "HI", "plant id": "66067", "generator id": "KES1", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66067", "date": "2023-05", "mw": 185}, "first_month": "2023-01", "changes": [{"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Kapolei Energy Storage", "plant state": "HI", "plant id": "66067", "generator id": "KES1", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66067", "date": "2023-12", "mw": 185}, "current_month": "2024-02", "dates": {"first_heard": "2023-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": false, "mwh": 565, "mwh_estimate": 370, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-01", "start_construction": "2021-08-25", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Kapolei Energy Storage", "name_short": "Kapolei", "owner": "Kapolei Energy Storage I, LLC", "state": "hawaii", "country": "usa", "lat": "21.328169", "long": "-158.105085", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:21.328169+-158.105085", "construction_time_month": 28, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 158, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "https://twitter.com/Tesla_Megapack/status/1745499330612748482"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bouldercombe", "city": "", "id": "119", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Genex Power", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "40", "status": "operation", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-23.537188", "long": "150.48991", "coords_hint": "3", "use_case": "", "notes": "used the date of the tweet as operation start date", "project_website": "https://www.genexpower.com.au/bouldercombe-battery-project.html", "link1": "https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "link2": "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "link3": "https://twitter.com/SawyerMerritt/status/1722857295078383700", "link4": ""}, "internal_id": "119", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Bouldercombe", "name_short": "Bouldercombe", "owner": "Genex Power", "state": "queensland", "country": "australia", "lat": "-23.537188", "long": "150.48991", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-23.537188+150.48991", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 40, "notes_split": ["used the date of the tweet as operation start date"], "links": ["https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "https://twitter.com/SawyerMerritt/status/1722857295078383700"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Riverina 1 + 2 / Darlington Point Energy Storage", "city": "Darlington Point", "id": "45", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "Edify Energy / Shell", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.646927", "long": "146.03516", "coords_hint": "1", "use_case": "333MW solar farm support", "notes": "it says on the project website that the 3 projects are colocated, so combined them here into just one entry", "project_website": "https://edifyenergy.com/project/riverina-darlington-point/", "link1": "https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "link2": "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "link3": "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "link4": "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"}, "internal_id": "45", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Riverina 1 + 2 / Darlington Point Energy Storage", "name_short": "Riverina 1 + 2 / Darlington Point", "owner": "", "state": "new south wales", "country": "australia", "lat": "-34.646927", "long": "146.03516", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.646927+146.03516", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["it says on the project website that the 3 projects are colocated, so combined them here into just one entry"], "links": ["https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Little Raith (Glenniston)", "city": "Auchtertool", "id": "824", "external_id": "11808", "state": "fife", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49.5", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-little-raith-bess/", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary", "link3": "", "link4": ""}, "internal_id": "824", "external_id": "11808", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gleniston, Auchtertool - Battery Storage Facility", "external_id": "11808", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2022-11-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11808", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Gleniston, Auchtertool - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Battery Storage Facility Gleniston Auchtertool ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "22/02323/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 49, "ext_id": "11808"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/08/2022", "to": "11/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "09/11/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11808", "Record Last Updated (dd/mm/yyyy)": "11/11/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Gleniston, Auchtertool - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Battery Storage Facility Gleniston Auchtertool ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "22/02323/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 49, "ext_id": "11808"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 99, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11-09", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Gleniston, Auchtertool - Battery Storage Facility", "name_short": "Gleniston, Auchtertool", "owner": "Harmony Energy Limited", "state": "scotland", "country": "uk", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.11287+-3.271262", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bumpers", "city": "Princes Risborough", "id": "844", "external_id": "", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "56", "status": "operation", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.7485", "long": "-0.88913", "coords_hint": "1", "use_case": "", "notes": "Construction dates from TTRO application", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-bumpers-bess/", "link1": "https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "link2": "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "link3": "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "link4": "https://twitter.com/heitplc/status/1679460677226823680"}, "internal_id": "844", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 99, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Bumpers", "name_short": "Bumpers", "owner": "Harmony Energy Income Trust", "state": "buckinghamshire", "country": "uk", "lat": "51.7485", "long": "-0.88913", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.7485+-0.88913", "construction_time_month": 12, "construction_speed_mwh_per_month": 16, "no_of_battery_units": 56, "notes_split": ["Construction dates from TTRO application"], "links": ["https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "https://twitter.com/heitplc/status/1679460677226823680"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Arroyo", "city": "McKinley County", "id": "101", "external_id": "63172", "state": "new mexico", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "PNM", "owner": "DE Shaw Renewable Investments (DSRI)", "developer": "Affordable Solar", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-03", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "450", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.9703", "long": "-107.5631", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ** the testimony link has a lot of info ** got the location info from the gem wiki", "project_website": "", "link1": "https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "link2": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link3": "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "link4": "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"}, "internal_id": "101", "external_id": "63172", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arroyo Solar Energy Storage Hybrid", "external_id": "63172", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Arroyo Solar LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-10", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARESS": {"first": {"year": "2022", "month": "6", "entity id": "62921", "entity name": "Arroyo Solar LLC", "plant producer type": "IPP", "plant name": "Arroyo Solar Energy Storage Hybrid", "plant state": "NM", "plant id": "63172", "generator id": "ARESS", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63172", "date": "2022-06", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "mw", "from": 40, "to": 150, "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "62921", "entity name": "Arroyo Solar LLC", "plant producer type": "IPP", "plant name": "Arroyo Solar Energy Storage Hybrid", "plant state": "NM", "plant id": "63172", "generator id": "ARESS", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63172", "date": "2023-07", "mw": 150}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-10"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-10", "start_operation": "2023-07", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Arroyo Solar Energy Storage Hybrid", "name_short": "Arroyo Solar", "owner": "Arroyo Solar LLC", "state": "new mexico", "country": "usa", "lat": "35.9703", "long": "-107.5631", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.9703+-107.5631", "construction_time_month": 21, "construction_speed_mwh_per_month": 28, "no_of_battery_units": 0, "notes_split": ["2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ", " the testimony link has a lot of info ", " got the location info from the gem wiki"], "links": ["https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Gigafactory Texas", "city": "", "id": "1176", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "125", "customer": "", "owner": "Tesla", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "68", "status": "operation", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.230756", "long": "-97.615973", "coords_hint": "1", "use_case": "", "notes": "used date of tweet for the operation start date", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1681503667030212608", "link2": "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "link3": "https://twitter.com/SawyerMerritt/status/1682834256928571392", "link4": "https://x.com/Tesla_Megapack/status/1791530954261172681"}, "internal_id": "1176", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 125, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Gigafactory Texas", "name_short": "Gigafactory Texas", "owner": "Tesla", "state": "texas", "country": "usa", "lat": "30.230756", "long": "-97.615973", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.230756+-97.615973", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 68, "notes_split": ["used date of tweet for the operation start date"], "links": ["https://twitter.com/Tesla_Megapack/status/1681503667030212608", "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "https://twitter.com/SawyerMerritt/status/1682834256928571392", "https://x.com/Tesla_Megapack/status/1791530954261172681"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Chapel Farm", "city": "Luton", "id": "129", "external_id": "7058", "state": "bedfordshire", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Tag Energy", "developer": "Harmony Energy", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "51.925835", "long": "-0.49999903", "coords_hint": "0", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://twitter.com/Tesla_Megapack/status/1669479285848182784", "link3": "", "link4": ""}, "internal_id": "129", "external_id": "7058", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chapel Farm", "external_id": "7058", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy", "status": "planning", "date_first_heard": "2019-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.925834", "long": "-0.499999", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7058", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Chapel Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ ", "X-coordinate": "503243", "Y-coordinate": "226320", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/18/01795/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.925834", "long": "-0.499999", "status": "planning", "mw": 49, "ext_id": "7058"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "13/06/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7058", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Chapel Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ ", "X-coordinate": "503243", "Y-coordinate": "226320", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/18/01795/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.925834", "long": "-0.499999", "status": "planning", "mw": 49, "ext_id": "7058"}, "current_month": "2024-01", "dates": {"first_heard": "2019-06-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 99, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-01-18", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Chapel Farm", "name_short": "Chapel Farm", "owner": "Harmony Energy", "state": "eastern", "country": "uk", "lat": "51.925834", "long": "-0.499999", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.925834+-0.499999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article"], "links": ["https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "https://twitter.com/Tesla_Megapack/status/1669479285848182784"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Farnham", "city": "Farnham", "id": "847", "external_id": "", "state": "surrey", "country": "uk", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.18894", "long": "-0.82903032", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "link3": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/", "link4": ""}, "internal_id": "847", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Farnham", "name_short": "Farnham", "owner": "Harmony Energy Income Trust", "state": "surrey", "country": "uk", "lat": "51.18894", "long": "-0.82903032", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.18894+-0.82903032", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "California Flats", "city": "monterey county", "id": "4", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "130", "customer": "Apple", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "85", "status": "operation", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.87009", "long": "-120.326403", "coords_hint": "1", "use_case": "130MW solar farm support", "notes": "used the release date of the youtube video as the operation start date", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "link2": "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "link3": "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "link4": "https://www.youtube.com/watch?v=SA3SdlKBtyc"}, "internal_id": "4", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 130, "mwh_is_estimate": false, "mwh": 240, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "California Flats", "name_short": "California Flats", "owner": "", "state": "california", "country": "usa", "lat": "35.87009", "long": "-120.326403", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.87009+-120.326403", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 85, "notes_split": ["used the release date of the youtube video as the operation start date"], "links": ["https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "https://www.youtube.com/watch?v=SA3SdlKBtyc"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Lessines", "city": "", "id": "843", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "Corsica Sole", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "cost_million": "33", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "50.72743", "long": "3.854307", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://insideevs.com/news/625965/tesla-megapack-battery-belgium/", "link2": "", "link3": "", "link4": ""}, "internal_id": "843", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Lessines", "name_short": "Lessines", "owner": "", "state": "", "country": "belgium", "lat": "50.72743", "long": "3.854307", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.72743+3.854307", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://insideevs.com/news/625965/tesla-megapack-battery-belgium/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Broadditch", "city": "Southfleet", "id": "845", "external_id": "", "state": "kent", "country": "uk", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.41493", "long": "0.32622", "coords_hint": "1", "use_case": "", "notes": "uses the megapack xl", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf", "link3": "", "link4": ""}, "internal_id": "845", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 11, "mwh_is_estimate": false, "mwh": 22, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Broadditch", "name_short": "Broadditch", "owner": "Harmony Energy Income Trust", "state": "kent", "country": "uk", "lat": "51.41493", "long": "0.32622", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.41493+0.32622", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 6, "notes_split": ["uses the megapack xl"], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Pillswood Phase 1", "city": "Cottingham", "id": "299", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": ""}, "internal_id": "299", "external_id": "7005", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pillswood Phase 1 ", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.801332", "long": "-0.415133", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7005", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Creyke Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504478", "Y-coordinate": "435057", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01993/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.801332", "long": "-0.415133", "status": "planning", "mw": 49, "ext_id": "7005"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "7360", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/11/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2019", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Creyke Substation", "to": "Pillswood Phase 1 ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Revised", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Revised", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "7360", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7005", "Record Last Updated (dd/mm/yyyy)": "09/11/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Pillswood Phase 1 ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504478", "Y-coordinate": "435057", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01993/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2020", "Under Construction": "01/04/2022", "Operational": "01/11/2022", "Heat Network Ref": "", "lat": "53.801332", "long": "-0.415133", "status": "operation", "mw": 49, "ext_id": "7005"}, "current_month": "2024-01", "dates": {"first_heard": "2019-06-13", "start_construction": "", "start_operation": "2022-11-09"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-11-17", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Pillswood Phase 1 ", "name_short": "Pillswood Phase 1 ", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.801332", "long": "-0.415133", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.801332+-0.415133", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 39, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Pillswood Phase 2", "city": "Cottingham", "id": "846", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Tesla", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": "https://twitter.com/Tesla_Megapack/status/1661649261757612032"}, "internal_id": "846", "external_id": "7360", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pillswood Phase 2", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "operation", "date_first_heard": "2019-11-14", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.802281", "long": "-0.416949", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7360", "Record Last Updated (dd/mm/yyyy)": "31/01/2020", "Operator (or Applicant)": "Northern Powergrid", "Site Name": "Creyke Beck Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504356", "Y-coordinate": "435160", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "19/01449/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.802281", "long": "-0.416949", "status": "planning", "mw": 49, "ext_id": "7360"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7005", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2020", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Northern Powergrid", "to": "Harmony Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Creyke Beck Substation", "to": "Pillswood Phase 2", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "7005", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7360", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Pillswood Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504356", "Y-coordinate": "435160", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "19/01449/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2022", "Under Construction": "01/04/2022", "Operational": "01/11/2022", "Heat Network Ref": "", "lat": "53.802281", "long": "-0.416949", "status": "operation", "mw": 49, "ext_id": "7360"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-31", "start_construction": "", "start_operation": "2022-11-09"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-11-14", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Pillswood Phase 2", "name_short": "Pillswood Phase 2", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.802281", "long": "-0.416949", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.802281+-0.416949", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 39, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "https://twitter.com/Tesla_Megapack/status/1661649261757612032"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Moss landing / Elkhorn", "city": "close to santa cruz", "id": "7", "external_id": "62564", "state": "california", "country": "usa", "capacity_mwh": "730", "estimate_mwh": "", "power_mw": "182", "customer": "PG&E", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "256", "status": "operation", "date_first_heard": "", "start_construction": "2020-07-01", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.807971", "long": "-121.781701", "coords_hint": "1", "use_case": "", "notes": "in 2020, 64mwh were added", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "link2": "https://en.wikipedia.org/wiki/Tesla_Megapack", "link3": "", "link4": ""}, "internal_id": "7", "external_id": "62564", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elkhorn Battery Energy Storage System", "external_id": "62564", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 364, "power_mw": 182, "owner": "Pacific Gas & Electric Co.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELKHO": {"first": {"year": "2021", "month": "3", "entity id": "14328", "entity name": "Pacific Gas & Electric Co.", "plant producer type": "Electric Utility", "plant name": "Elkhorn Battery Energy Storage System", "plant state": "CA", "plant id": "62564", "generator id": "ELKHO", "net summer capacity (mw)": "182.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62564", "date": "2021-03", "mw": 182}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-03", "to": "2021-07", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "14328", "entity name": "Pacific Gas & Electric Co.", "plant producer type": "Electric Utility", "plant name": "Elkhorn Battery Energy Storage System", "plant state": "CA", "plant id": "62564", "generator id": "ELKHO", "net summer capacity (mw)": "182.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62564", "date": "2022-04", "mw": 182}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-12"}, "month_disappeared": ""}}, "mw": 182, "mwh_is_estimate": false, "mwh": 730, "mwh_estimate": 364, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Elkhorn Battery Energy Storage System", "name_short": "Elkhorn Battery", "owner": "Pacific Gas & Electric Co.", "state": "california", "country": "usa", "lat": "36.807971", "long": "-121.781701", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.807971+-121.781701", "construction_time_month": 16, "construction_speed_mwh_per_month": 45, "no_of_battery_units": 256, "notes_split": ["in 2020, 64mwh were added"], "links": ["https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "https://en.wikipedia.org/wiki/Tesla_Megapack"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Alaska Soldotna", "city": "Soldotna Power Plant", "id": "23", "external_id": "57206", "state": "alaska", "country": "usa", "capacity_mwh": "93", "estimate_mwh": "", "power_mw": "46", "customer": "Homer Electric Association", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "37", "status": "operation", "date_first_heard": "2019-12-03", "start_construction": "", "start_operation": "2021-07-23", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "60.500441", "long": "-150.996312", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "link2": "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/", "link3": "", "link4": ""}, "internal_id": "23", "external_id": "57206", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Soldotna", "external_id": "57206", "state": "alaska", "country": "usa", "mwh": 0, "estimate_mwh": 92, "power_mw": 46, "owner": "Homer Electric Assn Inc", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"3": {"first": {"year": "2021", "month": "9", "entity id": "19558", "entity name": "Homer Electric Assn Inc", "plant producer type": "Electric Utility", "plant name": "Soldotna", "plant state": "AK", "plant id": "57206", "generator id": "3", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57206", "date": "2021-09", "mw": 46}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "1", "entity id": "19558", "entity name": "Homer Electric Assn Inc", "plant producer type": "Electric Utility", "plant name": "Soldotna", "plant state": "AK", "plant id": "57206", "generator id": "3", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57206", "date": "2022-01", "mw": 46}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 46, "mwh_is_estimate": false, "mwh": 93, "mwh_estimate": 92, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-01", "go_live_year_int": 2022, "name": "Soldotna", "name_short": "Soldotna", "owner": "Homer Electric Assn Inc", "state": "alaska", "country": "usa", "lat": "60.500441", "long": "-150.996312", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:60.500441+-150.996312", "construction_time_month": 14, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 37, "notes_split": [""], "links": ["https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Victorian Big Battery", "city": "geelong", "id": "2", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "450", "estimate_mwh": "", "power_mw": "300", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "212", "status": "operation", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.037741", "long": "144.290949", "coords_hint": "1", "use_case": "", "notes": "incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ** 2021-09-03 moving project back to construction", "project_website": "https://victorianbigbattery.com.au/", "link1": "https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "link2": "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "link3": "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "link4": "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"}, "internal_id": "2", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 300, "mwh_is_estimate": false, "mwh": 450, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Victorian Big Battery", "name_short": "Victorian Big Battery", "owner": "", "state": "victoria", "country": "australia", "lat": "-38.037741", "long": "144.290949", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-38.037741+144.290949", "construction_time_month": 11, "construction_speed_mwh_per_month": 40, "no_of_battery_units": 212, "notes_split": ["incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ", " 2021-09-03 moving project back to construction"], "links": ["https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wallgrove Grid Battery", "city": "Wallgrove / Sydney", "id": "12", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "75", "estimate_mwh": "", "power_mw": "50", "customer": "TransGrid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "cost_million": "65", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-33.817659", "long": "150.828087", "coords_hint": "1", "use_case": "FCAS, synthetic inertia", "notes": "", "project_website": "https://www.transgrid.com.au/wallgrovebattery", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "link2": "https://arena.gov.au/projects/transgrid-wallgrove-battery/", "link3": "", "link4": ""}, "internal_id": "12", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 75, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Wallgrove Grid Battery", "name_short": "Wallgrove Grid Battery", "owner": "", "state": "new south wales", "country": "australia", "lat": "-33.817659", "long": "150.828087", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.817659+150.828087", "construction_time_month": 10, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "https://arena.gov.au/projects/transgrid-wallgrove-battery/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Townsite Solar Project Hybrid", "city": "", "id": "228", "external_id": "60654", "state": "nevada", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "180", "power_mw": "90", "customer": "Arevon", "owner": "Townsite Solar, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.935805", "long": "-114.869386", "coords_hint": "1", "use_case": "190MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesla.com/videos/townsite-solar-storage", "link2": "https://arevonenergy.com/location/townsite/", "link3": "", "link4": ""}, "internal_id": "228", "external_id": "60654", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Townsite Solar Project Hybrid", "external_id": "60654", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 180, "power_mw": 90, "owner": "Townsite Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2021", "month": "11", "entity id": "60387", "entity name": "Townsite Solar, LLC", "plant producer type": "IPP", "plant name": "Townsite Solar Project Hybrid", "plant state": "NV", "plant id": "60654", "generator id": "GEN02", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "60654", "date": "2021-11", "mw": 90}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "60387", "entity name": "Townsite Solar, LLC", "plant producer type": "IPP", "plant name": "Townsite Solar Project Hybrid", "plant state": "NV", "plant id": "60654", "generator id": "GEN02", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60654", "date": "2021-12", "mw": 90}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 90, "mwh_is_estimate": false, "mwh": 360, "mwh_estimate": 180, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "2021-11", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Townsite Solar Project Hybrid", "name_short": "Townsite Solar", "owner": "Townsite Solar, LLC", "state": "nevada", "country": "usa", "lat": "35.935805", "long": "-114.869386", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.935805+-114.869386", "construction_time_month": 4, "construction_speed_mwh_per_month": 90, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesla.com/videos/townsite-solar-storage", "https://arevonenergy.com/location/townsite/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Contego", "city": "Hurstpierpoint", "id": "35", "external_id": "", "state": "west sussex", "country": "uk", "capacity_mwh": "68", "estimate_mwh": "", "power_mw": "34", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "28", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.955104", "long": "-0.163008", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.harmonyenergy.co.uk/projects/", "link1": "https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "link2": "https://www.youtube.com/watch?v=zh6PFeObrHs", "link3": "", "link4": ""}, "internal_id": "35", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 34, "mwh_is_estimate": false, "mwh": 68, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Contego", "name_short": "Contego", "owner": "", "state": "west sussex", "country": "uk", "lat": "50.955104", "long": "-0.163008", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.955104+-0.163008", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 28, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "https://www.youtube.com/watch?v=zh6PFeObrHs"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Agua Fria / Bolster Substation", "city": "Glendale / Phoenix", "id": "111", "external_id": "141", "state": "arizona", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "Salt River Project (SRP)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "32", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.553691", "long": "-112.212654", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "link2": "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/", "link3": "", "link4": ""}, "internal_id": "111", "external_id": "141", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Agua Fria", "external_id": "141", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Salt River Project", "status": "operation", "date_first_heard": "2021-10", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AFSB1": {"first": {"year": "2021", "month": "9", "entity id": "16572", "entity name": "Salt River Project", "plant producer type": "Electric Utility", "plant name": "Agua Fria", "plant state": "AZ", "plant id": "141", "generator id": "AFSB1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "141", "date": "2021-09", "mw": 25}, "first_month": "2021-10", "changes": [{"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-10", "to": "2021-09", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "9", "entity id": "16572", "entity name": "Salt River Project", "plant producer type": "Electric Utility", "plant name": "Agua Fria", "plant state": "AZ", "plant id": "141", "generator id": "AFSB1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "141", "date": "2021-09", "mw": 25}, "current_month": "2022-02", "dates": {"first_heard": "2021-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-10", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Agua Fria", "name_short": "Agua Fria", "owner": "Salt River Project", "state": "arizona", "country": "usa", "lat": "33.553691", "long": "-112.212654", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.553691+-112.212654", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 32, "notes_split": [""], "links": ["https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Mohammed bin Rashid Al Maktoum Solar Park", "city": "Dubai", "id": "118", "external_id": "", "state": "", "country": "uae", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "1", "customer": "", "owner": "Dubai Electricity and Water Authority (DEWA)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.765375", "long": "55.367443", "coords_hint": "0", "use_case": "1000MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "link2": "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/", "link3": "", "link4": ""}, "internal_id": "118", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 1, "mwh_is_estimate": false, "mwh": 8, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Mohammed bin Rashid Al Maktoum Solar Park", "name_short": "Mohammed bin Rashid Al Maktoum Sola...", "owner": "Dubai Electricity and Water Authority (DEWA)", "state": "", "country": "uae", "lat": "24.765375", "long": "55.367443", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:24.765375+55.367443", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Gambit", "city": "angleton / houston", "id": "6", "external_id": "64528", "state": "texas", "country": "usa", "capacity_mwh": "175", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-08", "start_construction": "2021-03-08", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.168189", "long": "-95.445369", "coords_hint": "1", "use_case": "tesla as energy providor", "notes": "drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger", "project_website": "https://www.gambit-energystorage.com/", "link1": "https://www.teslarati.com/tesla-texas-big-battery-report/", "link2": "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "link3": "https://www.youtube.com/watch?v=OottNRdebs8", "link4": "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"}, "internal_id": "6", "external_id": "64528", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gambit Energy Storage - Angleton Storage", "external_id": "64528", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Tesla Inc.", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2021", "month": "6", "entity id": "60947", "entity name": "Tesla Inc.", "plant producer type": "IPP", "plant name": "Gambit Energy Storage - Angleton Storage", "plant state": "TX", "plant id": "64528", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64528", "date": "2021-06", "mw": 100}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "6", "entity id": "60947", "entity name": "Tesla Inc.", "plant producer type": "IPP", "plant name": "Gambit Energy Storage - Angleton Storage", "plant state": "TX", "plant id": "64528", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64528", "date": "2021-06", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-04", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 175, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Gambit Energy Storage - Angleton Storage", "name_short": "Gambit Energy Storage - Angleton", "owner": "Tesla Inc.", "state": "texas", "country": "usa", "lat": "29.168189", "long": "-95.445369", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:29.168189+-95.445369", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger"], "links": ["https://www.teslarati.com/tesla-texas-big-battery-report/", "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "https://www.youtube.com/watch?v=OottNRdebs8", "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Saticoy", "city": "oxnard / los angeles", "id": "3", "external_id": "63891", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Arevon", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "142", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-06-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.25773", "long": "-119.158534", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "", "project_website": "", "link1": "https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "link2": "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "link3": "https://arevonenergy.com/location/saticoy/", "link4": ""}, "internal_id": "3", "external_id": "63891", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Saticoy", "external_id": "63891", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Ventura Energy Storage, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SATCY": {"first": {"year": "2021", "month": "4", "entity id": "63550", "entity name": "Ventura Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Saticoy", "plant state": "CA", "plant id": "63891", "generator id": "SATCY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63891", "date": "2021-04", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-04", "to": "2021-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-05", "to": "2021-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "4", "entity id": "63550", "entity name": "Ventura Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Saticoy", "plant state": "CA", "plant id": "63891", "generator id": "SATCY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63891", "date": "2021-04", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Saticoy", "name_short": "Saticoy", "owner": "Ventura Energy Storage, LLC", "state": "california", "country": "usa", "lat": "34.25773", "long": "-119.158534", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.25773+-119.158534", "construction_time_month": 5, "construction_speed_mwh_per_month": 80, "no_of_battery_units": 142, "notes_split": [""], "links": ["https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "https://arevonenergy.com/location/saticoy/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Silverstrand Grid Energy Storage System", "city": "", "id": "193", "external_id": "63735", "state": "california", "country": "usa", "capacity_mwh": "46", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Silverstrand Grid, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.205195", "long": "-119.058256", "coords_hint": "3", "use_case": "", "notes": "Using 3.1MWh to get from the packs to capacity", "project_website": "", "link1": "https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/", "link2": "", "link3": "", "link4": ""}, "internal_id": "193", "external_id": "63735", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Silverstrand Grid Energy Storage System", "external_id": "63735", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "Silverstrand Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SLV01": {"first": {"year": "2021", "month": "3", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "plant producer type": "IPP", "plant name": "Silverstrand Grid Energy Storage System", "plant state": "CA", "plant id": "63735", "generator id": "SLV01", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63735", "date": "2021-03", "mw": 11}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-03", "to": "2021-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "4", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "plant producer type": "IPP", "plant name": "Silverstrand Grid Energy Storage System", "plant state": "CA", "plant id": "63735", "generator id": "SLV01", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63735", "date": "2021-04", "mw": 11}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": false, "mwh": 46, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Silverstrand Grid Energy Storage System", "name_short": "Silverstrand Grid", "owner": "Silverstrand Grid, LLC", "state": "california", "country": "usa", "lat": "34.205195", "long": "-119.058256", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.205195+-119.058256", "construction_time_month": 3, "construction_speed_mwh_per_month": 15, "no_of_battery_units": 15, "notes_split": ["Using 3.1MWh to get from the packs to capacity"], "links": ["https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Vallecito Energy Storage Resilience (VESR)", "city": "carpinteria / santa barbara county", "id": "11", "external_id": "62801", "state": "california", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Clean Coalition", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "2020-11-05", "start_operation": "2021-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.408083", "long": "-119.512937", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "link2": "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/", "link3": "", "link4": ""}, "internal_id": "11", "external_id": "62801", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vallecito", "external_id": "62801", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Viridity Energy Solutions, Inc.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ORN34": {"first": {"year": "2020", "month": "12", "entity id": "61522", "entity name": "Viridity Energy Solutions, Inc.", "plant producer type": "IPP", "plant name": "Vallecito", "plant state": "CA", "plant id": "62801", "generator id": "ORN34", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "62801", "date": "2020-12", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "date", "from": "2020-12", "to": "2021-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-03", "to": "2021-02", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "2", "entity id": "61522", "entity name": "Viridity Energy Solutions, Inc.", "plant producer type": "IPP", "plant name": "Vallecito", "plant state": "CA", "plant id": "62801", "generator id": "ORN34", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62801", "date": "2021-02", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11-05", "start_operation": "2021-02", "start_estimated": "", "month_disappeared": "", "go_live": "2021-02", "go_live_year_int": 2021, "name": "Vallecito", "name_short": "Vallecito", "owner": "Viridity Energy Solutions, Inc.", "state": "california", "country": "usa", "lat": "34.408083", "long": "-119.512937", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.408083+-119.512937", "construction_time_month": 3, "construction_speed_mwh_per_month": 13, "no_of_battery_units": 15, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "WindCharger", "city": "", "id": "16", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "10", "customer": "TransAlta", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "9", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "49.582737", "long": "-113.794235", "coords_hint": "1", "use_case": "wind farm support", "notes": "", "project_website": "", "link1": "https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "link2": "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "link3": "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf", "link4": ""}, "internal_id": "16", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "month_disappeared": "", "go_live": "2020-10", "go_live_year_int": 2020, "name": "WindCharger", "name_short": "WindCharger", "owner": "", "state": "alberta", "country": "canada", "lat": "49.582737", "long": "-113.794235", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.582737+-113.794235", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 9, "notes_split": [""], "links": ["https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "ngen slovenia 2", "city": "Kidrievo", "id": "21", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "15", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "12", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.391223", "long": "15.78985", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/", "link2": "", "link3": "", "link4": ""}, "internal_id": "21", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 15, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "month_disappeared": "", "go_live": "2020-10", "go_live_year_int": 2020, "name": "ngen slovenia 2", "name_short": "ngen slovenia 2", "owner": "", "state": "", "country": "slovenia", "lat": "46.391223", "long": "15.78985", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.391223+15.78985", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 12, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Holes Bay", "city": "Poole", "id": "17", "external_id": "", "state": "dorset", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "7.5", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures BV ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "link2": "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "link3": "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "link4": "https://frv.com/en/projects/holes-bay/"}, "internal_id": "17", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 7, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "month_disappeared": "", "go_live": "2020-09", "go_live_year_int": 2020, "name": "Holes Bay", "name_short": "Holes Bay", "owner": "", "state": "dorset", "country": "uk", "lat": "50.726395", "long": "-1.9901", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.726395+-1.9901", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 6, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "https://frv.com/en/projects/holes-bay/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Lake Bonney Wind Farm", "city": "", "id": "28", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "25", "customer": "Infigen Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-37.738826", "long": "140.38693", "coords_hint": "1", "use_case": "278MW wind farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "link2": "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/", "link3": "", "link4": ""}, "internal_id": "28", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "month_disappeared": "", "go_live": "2020-01", "go_live_year_int": 2020, "name": "Lake Bonney Wind Farm", "name_short": "Lake Bonney Wind Farm", "owner": "", "state": "south australia", "country": "australia", "lat": "-37.738826", "long": "140.38693", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-37.738826+140.38693", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Nantucket", "city": "Nantucket island", "id": "25", "external_id": "", "state": "massachusetts", "country": "usa", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "6", "customer": "National Grid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.258489", "long": "-70.051666", "coords_hint": "1", "use_case": "island", "notes": "", "project_website": "", "link1": "https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "link2": "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/", "link3": "", "link4": ""}, "internal_id": "25", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 6, "mwh_is_estimate": false, "mwh": 48, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "month_disappeared": "", "go_live": "2019-19", "go_live_year_int": 2019, "name": "Nantucket", "name_short": "Nantucket", "owner": "", "state": "massachusetts", "country": "usa", "lat": "41.258489", "long": "-70.051666", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.258489+-70.051666", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "ngen slovenia 1", "city": "Jesenice", "id": "22", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "12", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.418237", "long": "14.10062", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.youtube.com/watch?v=v9j-2lsMcJ0", "link2": "", "link3": "", "link4": ""}, "internal_id": "22", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 22, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "month_disappeared": "", "go_live": "2019-10", "go_live_year_int": 2019, "name": "ngen slovenia 1", "name_short": "ngen slovenia 1", "owner": "", "state": "", "country": "slovenia", "lat": "46.418237", "long": "14.10062", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.418237+14.10062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.youtube.com/watch?v=v9j-2lsMcJ0"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Guildford electric buses", "city": "guildford", "id": "26", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "", "customer": "Zenobe Energy ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.205099", "long": "-0.581772", "coords_hint": "1", "use_case": "bus depot", "notes": "it is a stagecoach bus depot", "project_website": "", "link1": "https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "link2": "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/", "link3": "", "link4": ""}, "internal_id": "26", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "month_disappeared": "", "go_live": "2019-06", "go_live_year_int": 2019, "name": "Guildford electric buses", "name_short": "Guildford electric buses", "owner": "", "state": "", "country": "uk", "lat": "51.205099", "long": "-0.581772", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.205099+-0.581772", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": ["it is a stagecoach bus depot"], "links": ["https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Osaka Trains", "city": "Osaka", "id": "9", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "42", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.701231", "long": "135.494584", "coords_hint": "0", "use_case": "train station backup", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/telsa-powerpack-osaka-japan/", "link2": "", "link3": "", "link4": ""}, "internal_id": "9", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 12, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "month_disappeared": "", "go_live": "2019-03", "go_live_year_int": 2019, "name": "Osaka Trains", "name_short": "Osaka Trains", "owner": "", "state": "", "country": "japan", "lat": "34.701231", "long": "135.494584", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.701231+135.494584", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 42, "notes_split": [""], "links": ["https://www.teslarati.com/telsa-powerpack-osaka-japan/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Colorado ", "city": "Weld County", "id": "24", "external_id": "", "state": "colorado", "country": "usa", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "4", "customer": "United Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.577109", "long": "-104.40854", "coords_hint": "0", "use_case": "", "notes": "could not find exact location though it is operational", "project_website": "", "link1": "https://www.youtube.com/watch?v=dyAhUREGDzA", "link2": "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/", "link3": "", "link4": ""}, "internal_id": "24", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 4, "mwh_is_estimate": false, "mwh": 16, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "month_disappeared": "", "go_live": "2019-01", "go_live_year_int": 2019, "name": "Colorado ", "name_short": "Colorado ", "owner": "", "state": "colorado", "country": "usa", "lat": "40.577109", "long": "-104.40854", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.577109+-104.40854", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["could not find exact location though it is operational"], "links": ["https://www.youtube.com/watch?v=dyAhUREGDzA", "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Gannawarra Solar Farm", "city": "", "id": "27", "external_id": "", "state": "victora", "country": "australia", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "25", "customer": "Edify Energy / Wirsol", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-35.734258", "long": "143.780015", "coords_hint": "1", "use_case": "60MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/", "link2": "", "link3": "", "link4": ""}, "internal_id": "27", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "Gannawarra Solar Farm", "name_short": "Gannawarra Solar Farm", "owner": "", "state": "victora", "country": "australia", "lat": "-35.734258", "long": "143.780015", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-35.734258+143.780015", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Samoa", "city": "", "id": "30", "external_id": "", "state": "", "country": "samoa", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-13.885669", "long": "-171.884245", "coords_hint": "1", "use_case": "island", "notes": "2 locations at power station and airport", "project_website": "", "link1": "https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/", "link2": "", "link3": "", "link4": ""}, "internal_id": "30", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 13, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Samoa", "name_short": "Samoa", "owner": "", "state": "", "country": "samoa", "lat": "-13.885669", "long": "-171.884245", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-13.885669+-171.884245", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2 locations at power station and airport"], "links": ["https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Pinal Central Solar Energy Center", "city": "", "id": "31", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Salt River Project", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.868983", "long": "-111.557171", "coords_hint": "1", "use_case": "20MW solar farm support", "notes": "Added 40 mwh as the youtube video said it can power with 10MW for 4 hours", "project_website": "", "link1": "https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "link2": "https://www.youtube.com/watch?v=e9RuVL3t4jQ", "link3": "", "link4": ""}, "internal_id": "31", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Pinal Central Solar Energy Center", "name_short": "Pinal Central Solar", "owner": "", "state": "arizona", "country": "usa", "lat": "32.868983", "long": "-111.557171", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.868983+-111.557171", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Added 40 mwh as the youtube video said it can power with 10MW for 4 hours"], "links": ["https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "https://www.youtube.com/watch?v=e9RuVL3t4jQ"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Terhills", "city": "Terhills", "id": "32", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "29", "estimate_mwh": "", "power_mw": "18", "customer": "Restore", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.006595", "long": "5.711134", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/", "link2": "", "link3": "", "link4": ""}, "internal_id": "32", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 18, "mwh_is_estimate": false, "mwh": 29, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Terhills", "name_short": "Terhills", "owner": "", "state": "", "country": "belgium", "lat": "51.006595", "long": "5.711134", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.006595+5.711134", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hornsdale Power Reserve", "city": "hornsdale", "id": "8", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "194", "estimate_mwh": "", "power_mw": "150", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.085797", "long": "138.518339", "coords_hint": "1", "use_case": "316MW wind farm support", "notes": "42 power packs", "project_website": "https://hornsdalepowerreserve.com.au/", "link1": "https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve", "link2": "", "link3": "", "link4": ""}, "internal_id": "8", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 194, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-12", "go_live_year_int": 2017, "name": "Hornsdale Power Reserve", "name_short": "Hornsdale Power Reserve", "owner": "", "state": "south australia", "country": "australia", "lat": "-33.085797", "long": "138.518339", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.085797+138.518339", "construction_time_month": 4, "construction_speed_mwh_per_month": 48, "no_of_battery_units": 0, "notes_split": ["42 power packs"], "links": ["https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Mira Loma Substation", "city": "Ontario", "id": "20", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "SCE Southern California Edison", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.00548", "long": "-117.566749", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity", "link2": "", "link3": "", "link4": ""}, "internal_id": "20", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "month_disappeared": "", "go_live": "2017-06", "go_live_year_int": 2017, "name": "Mira Loma Substation", "name_short": "Mira Loma Substation", "owner": "", "state": "california", "country": "usa", "lat": "34.00548", "long": "-117.566749", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.00548+-117.566749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Kauai Island", "city": "Kauai", "id": "19", "external_id": "", "state": "hawaii", "country": "usa", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "", "customer": "KIUC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.998353", "long": "-159.378905", "coords_hint": "1", "use_case": "island, 13mw solar farm support", "notes": "20 year contract to buy energy", "project_website": "", "link1": "https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "link2": "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "link3": "https://en.wikipedia.org/wiki/Kauai", "link4": ""}, "internal_id": "19", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Kauai Island", "name_short": "Kauai Island", "owner": "", "state": "hawaii", "country": "usa", "lat": "21.998353", "long": "-159.378905", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:21.998353+-159.378905", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": ["20 year contract to buy energy"], "links": ["https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "https://en.wikipedia.org/wiki/Kauai"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Trents Energy Storage", "city": "St. Lucy", "id": "36", "external_id": "", "state": "", "country": "barbados", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "5", "customer": "Barbados Light & Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "13.293125", "long": "-59.627449", "coords_hint": "1", "use_case": "island, solar farm support", "notes": "", "project_website": "", "link1": "https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "link2": "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/", "link3": "", "link4": ""}, "internal_id": "36", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 5, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-01", "go_live_year_int": 2017, "name": "Trents Energy Storage", "name_short": "Trents", "owner": "", "state": "", "country": "barbados", "lat": "13.293125", "long": "-59.627449", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:13.293125+-59.627449", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Ta'u island", "city": "Ta'u island", "id": "29", "external_id": "", "state": "american samoa", "country": "usa", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-14.219534", "long": "-169.494626", "coords_hint": "1", "use_case": "island, 1.4MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/", "link2": "", "link3": "", "link4": ""}, "internal_id": "29", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 6, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "month_disappeared": "", "go_live": "2016-11", "go_live_year_int": 2016, "name": "Ta'u island", "name_short": "Ta'u island", "owner": "", "state": "american samoa", "country": "usa", "lat": "-14.219534", "long": "-169.494626", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-14.219534+-169.494626", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hornsea Project Three - Battery Storage", "city": "", "id": "1379", "external_id": "9754", "state": "eastern", "country": "uk", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "Orsted Power (UK) Limited", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1800920444276543858", "link2": "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511", "link3": "", "link4": ""}, "internal_id": "1379", "external_id": "9754", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hornsea Project Three - Battery Storage", "external_id": "9754", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Orsted Power (UK) Limited", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.575424", "long": "1.247254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9754", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "Orsted Power (UK) Limited", "Site Name": "Hornsea Project Three - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Main Road, Swardeston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR4 6US", "X-coordinate": "620129", "Y-coordinate": "302465", "Planning Authority": "South Norfolk District Council", "Planning Application Reference": "2022/0867", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.575424", "long": "1.247254", "status": "planning", "mw": 200, "ext_id": "9754"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9754", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "Orsted Power (UK) Limited", "Site Name": "Hornsea Project Three - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Main Road, Swardeston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR4 6US", "X-coordinate": "620129", "Y-coordinate": "302465", "Planning Authority": "South Norfolk District Council", "Planning Application Reference": "2022/0867", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.575424", "long": "1.247254", "status": "planning", "mw": 200, "ext_id": "9754"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "month_disappeared": "", "go_live": "0 ~ 2026Q4", "go_live_year_int": 2026, "name": "Hornsea Project Three - Battery Storage", "name_short": "Hornsea Project Three", "owner": "Orsted Power (UK) Limited", "state": "eastern", "country": "uk", "lat": "52.575424", "long": "1.247254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.575424+1.247254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://x.com/Tesla_Megapack/status/1800920444276543858", "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Orana BESS", "city": "wellington", "id": "1395", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1660", "estimate_mwh": "", "power_mw": "415", "customer": "EnergyAustralia", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "650", "cost_currency": "AUD", "cost_incl_solar": "0", "lat": "-32.527608", "long": "148.958942", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1812687836887281794", "link2": "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million", "link3": "", "link4": ""}, "internal_id": "1395", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 415, "mwh_is_estimate": false, "mwh": 1660, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "month_disappeared": "", "go_live": "0 ~ 2026", "go_live_year_int": 2026, "name": "Orana BESS", "name_short": "Orana", "owner": "Akaysha Energy", "state": "new south wales", "country": "australia", "lat": "-32.527608", "long": "148.958942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-32.527608+148.958942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://x.com/SawyerMerritt/status/1812687836887281794", "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Collie Battery Stage 2", "city": "", "id": "1394", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "1363", "estimate_mwh": "", "power_mw": "341", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31", "long": "116.29", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://colliebattery.com.au/2024/05/01/construction-stage2/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1394", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 341, "mwh_is_estimate": false, "mwh": 1363, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "month_disappeared": "", "go_live": "0 ~ 2025Q4", "go_live_year_int": 2025, "name": "Collie Battery Stage 2", "name_short": "Collie Battery Stage 2", "owner": "neoen", "state": "western australia", "country": "australia", "lat": "-33.31", "long": "116.29", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.31+116.29", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 224, "notes_split": [""], "links": ["https://colliebattery.com.au/2024/05/01/construction-stage2/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Limondale", "city": "balranald", "id": "1396", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "RWE", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.774873", "long": "143.526866", "coords_hint": "2", "use_case": "", "notes": "location from the balrnald supstation on google maps", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1795348622864945179", "link2": "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/", "link3": "", "link4": ""}, "internal_id": "1396", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "month_disappeared": "", "go_live": "0 ~ 2025Q4", "go_live_year_int": 2025, "name": "Limondale", "name_short": "Limondale", "owner": "RWE", "state": "new south wales", "country": "australia", "lat": "-34.774873", "long": "143.526866", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.774873+143.526866", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from the balrnald supstation on google maps"], "links": ["https://x.com/SawyerMerritt/status/1795348622864945179", "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Western Downs Battery", "city": "South West Queensland", "id": "850", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "270", "customer": "Neoen Australia", "owner": "Neoen", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-26.976142", "long": "150.666771", "coords_hint": "2", "use_case": "solar farm support", "notes": "", "project_website": "https://westerndownsgreenpowerhub.com.au/", "link1": "https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "link2": "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/", "link3": "", "link4": ""}, "internal_id": "850", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 270, "mwh_is_estimate": false, "mwh": 540, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "month_disappeared": "", "go_live": "0 ~ 2025Q1", "go_live_year_int": 2025, "name": "Western Downs Battery", "name_short": "Western Downs Battery", "owner": "Neoen", "state": "queensland", "country": "australia", "lat": "-26.976142", "long": "150.666771", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-26.976142+150.666771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Cross Town", "city": "Gorham", "id": "114", "external_id": "66606", "state": "maine", "country": "usa", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "175", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.68383", "long": "-70.39786", "coords_hint": "1", "use_case": "", "notes": "pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ** got the info about tesla from twitter thread as all plus power project seem to be tesla", "project_website": "https://www.crosstownenergystorage.com/about", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "114", "external_id": "66606", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cross Town Energy Storage", "external_id": "66606", "state": "maine", "country": "usa", "mwh": 0, "estimate_mwh": 350, "power_mw": 175, "owner": "Cross Town Energy Storage LLC", "status": "construction", "date_first_heard": "2023-05", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CROS1": {"first": {"year": "2025", "month": "3", "entity id": "65639", "entity name": "Cross Town Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cross Town Energy Storage", "plant state": "ME", "plant id": "66606", "generator id": "CROS1", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66606", "date": "2025-03", "mw": 175}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-03", "to": "2025-08", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "8", "entity id": "65639", "entity name": "Cross Town Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cross Town Energy Storage", "plant state": "ME", "plant id": "66606", "generator id": "CROS1", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66606", "date": "2025-08", "mw": 175}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 175, "mwh_is_estimate": false, "mwh": 350, "mwh_estimate": 350, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-05", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "go_live": "0 ~ 2025-08", "go_live_year_int": 2025, "name": "Cross Town Energy Storage", "name_short": "Cross Town", "owner": "Cross Town Energy Storage LLC", "state": "maine", "country": "usa", "lat": "43.68383", "long": "-70.39786", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:43.68383+-70.39786", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ", " got the info about tesla from twitter thread as all plus power project seem to be tesla"], "links": ["https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Brendale BESS", "city": "brisbane", "id": "1392", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "410", "estimate_mwh": "", "power_mw": "205", "customer": "", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.329132", "long": "152.973193", "coords_hint": "1", "use_case": "", "notes": "got the location from the picture and in the energy storage article it says it is hosted on unitywater site", "project_website": "https://akayshaenergy.com/projects/brendale-bess", "link1": "https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1392", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 205, "mwh_is_estimate": false, "mwh": 410, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Brendale BESS", "name_short": "Brendale", "owner": "Akaysha Energy", "state": "queensland", "country": "australia", "lat": "-27.329132", "long": "152.973193", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.329132+152.973193", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the location from the picture and in the energy storage article it says it is hosted on unitywater site"], "links": ["https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Swanbank", "city": "Ipswich", "id": "1321", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "", "developer": "Clean Co", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "cost_million": "330", "cost_currency": "USD", "cost_incl_solar": "", "lat": "-27.649131", "long": "152.814807", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1759460910530265090", "link2": "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/", "link3": "", "link4": ""}, "internal_id": "1321", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 500, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Swanbank", "name_short": "Swanbank", "owner": "", "state": "queensland", "country": "australia", "lat": "-27.649131", "long": "152.814807", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.649131+152.814807", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1759460910530265090", "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Cranberry Point", "city": "Carver", "id": "113", "external_id": "62844", "state": "massachusetts", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.896693", "long": "-70.786639", "coords_hint": "1", "use_case": "", "notes": "got the info about tesla as manufacturer from twitter thread and FAQ on the project website", "project_website": "https://cranberrypointenergystorage.com/", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "113", "external_id": "62844", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cranberry Point Energy Storage", "external_id": "62844", "state": "massachusetts", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Cranberry Point Energy Storage LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NA": {"first": {"year": "2023", "month": "5", "entity id": "62733", "entity name": "Cranberry Point Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cranberry Point Energy Storage", "plant state": "MA", "plant id": "62844", "generator id": "NA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62844", "date": "2023-05", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2023-05", "to": "2024-06", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-06", "to": "2025-05", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "5", "entity id": "62733", "entity name": "Cranberry Point Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cranberry Point Energy Storage", "plant state": "MA", "plant id": "62844", "generator id": "NA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62844", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Cranberry Point Energy Storage", "name_short": "Cranberry Point", "owner": "Cranberry Point Energy Storage LLC", "state": "massachusetts", "country": "usa", "lat": "41.896693", "long": "-70.786639", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.896693+-70.786639", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the info about tesla as manufacturer from twitter thread and FAQ on the project website"], "links": ["https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Nighthawk Energy Storage, LLC", "city": "", "id": "774", "external_id": "65889", "state": "california", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "600", "power_mw": "300", "customer": "arevon", "owner": "Nighthawk Energy Storage, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.957486", "long": "-117.038749", "coords_hint": "3", "use_case": "", "notes": "got the coords from arevon website, but probably not the exact location yet", "project_website": "https://arevonenergy.com/location/nighthawk/", "link1": "https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/", "link2": "", "link3": "", "link4": ""}, "internal_id": "774", "external_id": "65889", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Nighthawk Energy Storage, LLC", "external_id": "65889", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Nighthawk Energy Storage, LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "6", "entity id": "65088", "entity name": "Nighthawk Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Nighthawk Energy Storage, LLC", "plant state": "CA", "plant id": "65889", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65889", "date": "2024-06", "mw": 300}, "first_month": "2022-09", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-02", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-02", "to": "2025-04", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "4", "entity id": "65088", "entity name": "Nighthawk Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Nighthawk Energy Storage, LLC", "plant state": "CA", "plant id": "65889", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65889", "date": "2025-04", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": false, "mwh": 1200, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Nighthawk Energy Storage, LLC", "name_short": "Nighthawk Energy Storage", "owner": "Nighthawk Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.957486", "long": "-117.038749", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.957486+-117.038749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the coords from arevon website, but probably not the exact location yet"], "links": ["https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Scatter Wash BESS", "city": "Phoenix", "id": "1322", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "1020", "estimate_mwh": "", "power_mw": "255", "customer": "", "owner": "", "developer": "Strata Clean Energy", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "500", "cost_currency": "USD", "cost_incl_solar": "", "lat": "33.685402", "long": "-112.125062", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1748500029197726146", "link2": "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/", "link3": "", "link4": ""}, "internal_id": "1322", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 255, "mwh_is_estimate": false, "mwh": 1020, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Scatter Wash BESS", "name_short": "Scatter Wash", "owner": "", "state": "arizona", "country": "usa", "lat": "33.685402", "long": "-112.125062", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.685402+-112.125062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1748500029197726146", "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Eland Solar & Storage Center, Phase 2 Hybrid", "city": "", "id": "164", "external_id": "61169", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "69SV 8me LLC", "developer": "Arevon", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "150", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "35.198008", "long": "-117.994", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1760848348607594844", "link2": "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "link3": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link4": ""}, "internal_id": "164", "external_id": "61169", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eland Solar & Storage Center, Phase 2 Hybrid", "external_id": "61169", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "69SV 8me LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61169": {"first": {"year": "2023", "month": "7", "entity id": "60798", "entity name": "69SV 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 2 Hybrid", "plant state": "CA", "plant id": "61169", "generator id": "61169", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61169", "date": "2023-07", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-11", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-11", "to": "2025-03", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "3", "entity id": "60798", "entity name": "69SV 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 2 Hybrid", "plant state": "CA", "plant id": "61169", "generator id": "61169", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61169", "date": "2025-03", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Eland Solar & Storage Center, Phase 2 Hybrid", "name_short": "Eland Solar & Storage Center, Phase...", "owner": "69SV 8me LLC", "state": "california", "country": "usa", "lat": "35.198008", "long": "-117.994", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.198008+-117.994", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1760848348607594844", "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "https://x.com/Tesla_Megapack/status/1794120454883659833"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Peregrine", "city": "San Diego", "id": "865", "external_id": "66286", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.692183", "long": "-117.13667", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/peregrine/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/", "link2": "", "link3": "", "link4": ""}, "internal_id": "865", "external_id": "66286", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peregrine Energy Storage LLC", "external_id": "66286", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Peregrine Energy Storage, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PERE1": {"first": {"year": "2024", "month": "8", "entity id": "65398", "entity name": "Peregrine Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Peregrine Energy Storage LLC", "plant state": "CA", "plant id": "66286", "generator id": "PERE1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66286", "date": "2024-08", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2023-10", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-08", "to": "2024-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2024-09", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-09", "to": "2024-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-10", "to": "2025-01", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "65398", "entity name": "Peregrine Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Peregrine Energy Storage LLC", "plant state": "CA", "plant id": "66286", "generator id": "PERE1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66286", "date": "2025-01", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "Peregrine Energy Storage LLC", "name_short": "Peregrine Energy Storage", "owner": "Peregrine Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.692183", "long": "-117.13667", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.692183+-117.13667", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Oneida Energy Storage Project", "city": "Haldimand County", "id": "866", "external_id": "", "state": "ontario", "country": "canada", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "NRStor", "owner": "Northland Power ** SNGRDC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "42.886859", "long": "-80.12224", "coords_hint": "3", "use_case": "", "notes": "The article mentions Jarvis in Haldimand County", "project_website": "https://www.snfuture.com/projects/oneida-energy-storage/", "link1": "https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/", "link2": "", "link3": "", "link4": ""}, "internal_id": "866", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "Oneida Energy Storage Project", "name_short": "Oneida", "owner": "Northland Power ** SNGRDC", "state": "ontario", "country": "canada", "lat": "42.886859", "long": "-80.12224", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.886859+-80.12224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["The article mentions Jarvis in Haldimand County"], "links": ["https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Collie Battery Stage 1", "city": "", "id": "1174", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "877", "estimate_mwh": "", "power_mw": "219", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31604", "long": "116.289605", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "link2": "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/", "link3": "", "link4": ""}, "internal_id": "1174", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 219, "mwh_is_estimate": false, "mwh": 877, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "month_disappeared": "", "go_live": "0 ~ 2024Q4", "go_live_year_int": 2024, "name": "Collie Battery Stage 1", "name_short": "Collie Battery Stage 1", "owner": "neoen", "state": "western australia", "country": "australia", "lat": "-33.31604", "long": "116.289605", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.31604+116.289605", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 224, "notes_split": [""], "links": ["https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Rye Common", "city": "Farnham", "id": "410", "external_id": "7737", "state": "hampshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.25011", "long": "-0.87423", "coords_hint": "1", "use_case": "", "notes": "Phase II is 200m north-east of Phase I", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "link4": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"}, "internal_id": "410", "external_id": "7737", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rye Common", "external_id": "7737", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pulse Clean Energy", "status": "planning", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.248047", "long": "-0.87689", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7737", "Record Last Updated (dd/mm/yyyy)": "06/10/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rye Common", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Address": "Street Record, Rye Common Lane, Crondall, Farnham, Surrey", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DD", "X-coordinate": "478485", "Y-coordinate": "150474", "Planning Authority": "Hart District Council", "Planning Application Reference": "20/00651/FUL", "Appeal Reference": "PP-08735792", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "01/05/2020", "Appeal Lodged": "22/02/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "28/09/2021", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.248047", "long": "-0.87689", "status": "planning", "mw": 49, "ext_id": "7737"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Street Record, Rye Common Lane, Crondall, Farnham, Surrey", "to": "Street Record, Rye Common Lane, Crondall, Farnham, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Granted", "from": "", "to": "28/09/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/10/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/03/2020", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Harmony Energy Storage", "to": "Pulse Clean Energy", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7737", "Record Last Updated (dd/mm/yyyy)": "12/03/2020", "Operator (or Applicant)": "Pulse Clean Energy", "Site Name": "Rye Common", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7028", "Address": "Street Record, Rye Common Lane, Crondall, Farnham, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DD", "X-coordinate": "478485", "Y-coordinate": "150474", "Planning Authority": "Hart District Council", "Planning Application Reference": "20/00651/FUL", "Appeal Reference": "PP-08735792", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "01/05/2020", "Appeal Lodged": "22/02/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "28/09/2021", "Planning Permission Granted": "28/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.248047", "long": "-0.87689", "status": "planning", "mw": 49, "ext_id": "7737"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "month_disappeared": "", "go_live": "0 ~ 2024Q3", "go_live_year_int": 2024, "name": "Rye Common", "name_short": "Rye Common", "owner": "Pulse Clean Energy", "state": "south east", "country": "uk", "lat": "51.248047", "long": "-0.87689", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.248047+-0.87689", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Phase II is 200m north-east of Phase I"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hawthorn Pit", "city": "Murton", "id": "849", "external_id": "", "state": "county durham", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99.8", "power_mw": "49.9", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.80552", "long": "-1.40646", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, "internal_id": "849", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 49, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "month_disappeared": "", "go_live": "0 ~ 2024Q2", "go_live_year_int": 2024, "name": "Hawthorn Pit", "name_short": "Hawthorn Pit", "owner": "Harmony Energy Income Trust", "state": "county durham", "country": "uk", "lat": "54.80552", "long": "-1.40646", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.80552+-1.40646", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Failed Oct 2022 C share placement puts construction in doubt"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wormald Green", "city": "Harrogate", "id": "848", "external_id": "", "state": "yorkshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.07548", "long": "-1.52312", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, "internal_id": "848", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 33, "mwh_is_estimate": true, "mwh": 66, "mwh_estimate": 66, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "month_disappeared": "", "go_live": "0 ~ 2024Q1", "go_live_year_int": 2024, "name": "Wormald Green", "name_short": "Wormald Green", "owner": "Harmony Energy Income Trust", "state": "yorkshire", "country": "uk", "lat": "54.07548", "long": "-1.52312", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.07548+-1.52312", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Failed Oct 2022 C share placement puts construction in doubt"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ville-sur-Haine", "city": "", "id": "1393", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Eneco", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.47647", "long": "4.077998", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1393", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Ville-sur-Haine", "name_short": "Ville-sur-Haine", "owner": "Eneco", "state": "", "country": "belgium", "lat": "50.47647", "long": "4.077998", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.47647+4.077998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Eland Solar", "city": "Kern County", "id": "62", "external_id": "61168", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "8minute / Capital Dynamics / LADWP", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-22", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.198008", "long": "-117.991201", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "location from planning doc ** partially online in 2022, fully in 2023", "project_website": "", "link1": "https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "link2": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link3": "", "link4": ""}, "internal_id": "62", "external_id": "61168", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eland Solar & Storage Center, Phase 1 Hybrid", "external_id": "61168", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "68SF 8me LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-01", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61168": {"first": {"year": "2022", "month": "11", "entity id": "60797", "entity name": "68SF 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 1 Hybrid", "plant state": "CA", "plant id": "61168", "generator id": "61168", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61168", "date": "2022-11", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-11", "to": "2023-07", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-03", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-11", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-11", "to": "2024-09", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "60797", "entity name": "68SF 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 1 Hybrid", "plant state": "CA", "plant id": "61168", "generator id": "61168", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "61168", "date": "2024-09", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-01", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Eland Solar & Storage Center, Phase 1 Hybrid", "name_short": "Eland Solar & Storage Center, Phase...", "owner": "68SF 8me LLC", "state": "california", "country": "usa", "lat": "35.198008", "long": "-117.991201", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.198008+-117.991201", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from planning doc ", " partially online in 2022, fully in 2023"], "links": ["https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "https://x.com/Tesla_Megapack/status/1794120454883659833"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Sierra Estrella Energy Storage", "city": "", "id": "851", "external_id": "66334", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "276", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.410648", "long": "-112.313765", "coords_hint": "1", "use_case": "", "notes": "got the location from the map on the projects page / nr of megapacks from the pdf", "project_website": "https://www.sierraestrellaenergystorage.com/about", "link1": "https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf", "link2": "", "link3": "", "link4": ""}, "internal_id": "851", "external_id": "66334", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sierra Estrella Energy Storage", "external_id": "66334", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Sierra Estrella Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS3": {"first": {"year": "2024", "month": "6", "entity id": "65418", "entity name": "Sierra Estrella Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Sierra Estrella Energy Storage", "plant state": "AZ", "plant id": "66334", "generator id": "BESS3", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66334", "date": "2024-06", "mw": 250}, "first_month": "2023-03", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65418", "entity name": "Sierra Estrella Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Sierra Estrella Energy Storage", "plant state": "AZ", "plant id": "66334", "generator id": "BESS3", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66334", "date": "2024-06", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 500, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Sierra Estrella Energy Storage", "name_short": "Sierra Estrella", "owner": "Sierra Estrella Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "33.410648", "long": "-112.313765", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.410648+-112.313765", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 276, "notes_split": ["got the location from the map on the projects page / nr of megapacks from the pdf"], "links": ["https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Superstition Energy Storage", "city": "Gilbert", "id": "852", "external_id": "66333", "state": "arizona", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "", "power_mw": "90", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.358927", "long": "-111.831039", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.superstitionenergystorage.com/about", "link1": "https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "852", "external_id": "66333", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Superstition Energy Storage", "external_id": "66333", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 180, "power_mw": 90, "owner": "Superstition Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS4": {"first": {"year": "2024", "month": "6", "entity id": "65419", "entity name": "Superstition Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Superstition Energy Storage", "plant state": "AZ", "plant id": "66333", "generator id": "BESS4", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66333", "date": "2024-06", "mw": 90}, "first_month": "2023-03", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65419", "entity name": "Superstition Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Superstition Energy Storage", "plant state": "AZ", "plant id": "66333", "generator id": "BESS4", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66333", "date": "2024-06", "mw": 90}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 90, "mwh_is_estimate": false, "mwh": 360, "mwh_estimate": 180, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Superstition Energy Storage", "name_short": "Superstition", "owner": "Superstition Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "33.358927", "long": "-111.831039", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.358927+-111.831039", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Vikings Energy Farm", "city": "", "id": "697", "external_id": "65711", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Vikings Energy Farm, LLC", "developer": "arevon", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.804395", "long": "-115.274713", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/viking/", "link1": "https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "link2": "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/", "link3": "", "link4": ""}, "internal_id": "697", "external_id": "65711", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vikings Energy Farm", "external_id": "65711", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Vikings Energy Farm, LLC", "status": "construction", "date_first_heard": "2022-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN2": {"first": {"year": "2023", "month": "12", "entity id": "64966", "entity name": "Vikings Energy Farm, LLC", "plant producer type": "IPP", "plant name": "Vikings Energy Farm", "plant state": "CA", "plant id": "65711", "generator id": "GEN2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65711", "date": "2023-12", "mw": 150}, "first_month": "2022-07", "changes": [{"month": "2023-02", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-08", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-02", "extra": "accelerated by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64966", "entity name": "Vikings Energy Farm, LLC", "plant producer type": "IPP", "plant name": "Vikings Energy Farm", "plant state": "CA", "plant id": "65711", "generator id": "GEN2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65711", "date": "2024-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Vikings Energy Farm", "name_short": "Vikings Energy Farm", "owner": "Vikings Energy Farm, LLC", "state": "california", "country": "usa", "lat": "32.804395", "long": "-115.274713", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.804395+-115.274713", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Condor", "city": "", "id": "864", "external_id": "66285", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.020505", "long": "-117.332255", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/condor/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/", "link2": "", "link3": "", "link4": ""}, "internal_id": "864", "external_id": "66285", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Condor Energy Storage LLC", "external_id": "66285", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Condor Energy Storage LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"COND1": {"first": {"year": "2024", "month": "8", "entity id": "65397", "entity name": "Condor Energy Storage LLC", "plant producer type": "IPP", "plant name": "Condor Energy Storage LLC", "plant state": "CA", "plant id": "66285", "generator id": "COND1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66285", "date": "2024-08", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-03", "extra": "accelerated by 5 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65397", "entity name": "Condor Energy Storage LLC", "plant producer type": "IPP", "plant name": "Condor Energy Storage LLC", "plant state": "CA", "plant id": "66285", "generator id": "COND1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66285", "date": "2024-05", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Condor Energy Storage LLC", "name_short": "Condor Energy Storage", "owner": "Condor Energy Storage LLC", "state": "california", "country": "usa", "lat": "34.020505", "long": "-117.332255", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.020505+-117.332255", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Rusholme Grange Resubmission", "city": "Selby", "id": "489", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "70", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.73122", "long": "-0.94159", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00", "link3": "", "link4": ""}, "internal_id": "489", "external_id": "9121", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rusholme Grange ", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Harmony Energy Storage", "status": "planning", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9121", "Record Last Updated (dd/mm/yyyy)": "07/06/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rusholme Grange Resubmission", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/0601/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 40, "ext_id": "9121"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2021", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire", "to": "Rusholme Grange, Rusholme Lane, Drax, Selby", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "19/12/2017", "to": "03/09/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Site Name", "from": "Rusholme Grange Resubmission", "to": "Rusholme Grange ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/09/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9121", "Record Last Updated (dd/mm/yyyy)": "13/12/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rusholme Grange ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7093", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/0601/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 40, "ext_id": "9121"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": false, "mwh": 70, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "month_disappeared": "", "go_live": "0 ~ 2023Q3", "go_live_year_int": 2023, "name": "Rusholme Grange ", "name_short": "Rusholme Grange ", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.73117+-0.937436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Nofar Israel", "city": "", "id": "5", "external_id": "", "state": "", "country": "israel", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "Nofar Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.961747", "long": "34.835081", "coords_hint": "0", "use_case": "150mw solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy", "link2": "", "link3": "", "link4": ""}, "internal_id": "5", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Nofar Israel", "name_short": "Nofar Israel", "owner": "", "state": "", "country": "israel", "lat": "31.961747", "long": "34.835081", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.961747+34.835081", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hokkaido", "city": "", "id": "10", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.325369", "long": "142.589328", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market", "link2": "", "link3": "", "link4": ""}, "internal_id": "10", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 6, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hokkaido", "name_short": "Hokkaido", "owner": "", "state": "", "country": "japan", "lat": "43.325369", "long": "142.589328", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:43.325369+142.589328", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "switch datacenter", "city": "", "id": "18", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "", "customer": "switch", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.058908", "long": "-115.21174", "coords_hint": "0", "use_case": "datacenter", "notes": "", "project_website": "", "link1": "https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/", "link2": "", "link3": "", "link4": ""}, "internal_id": "18", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "switch datacenter", "name_short": "switch datacenter", "owner": "", "state": "nevada", "country": "usa", "lat": "36.058908", "long": "-115.21174", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.058908+-115.21174", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ozop New York", "city": "new york city / brooklyn", "id": "33", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "2", "customer": "Ozop Energy Systems", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.645624", "long": "-73.940749", "coords_hint": "0", "use_case": "peak shaving", "notes": "together with stem athena software", "project_website": "", "link1": "https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "link2": "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html", "link3": "", "link4": ""}, "internal_id": "33", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 2, "mwh_is_estimate": false, "mwh": 4, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ozop New York", "name_short": "Ozop New York", "owner": "", "state": "new york", "country": "usa", "lat": "40.645624", "long": "-73.940749", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.645624+-73.940749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["together with stem athena software"], "links": ["https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Holes Bay", "city": "Poole", "id": "404", "external_id": "7688", "state": "dorset", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 17", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "404", "external_id": "7688", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holes Bay", "external_id": "7688", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Harmony Energy", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.726324", "long": "-1.990215", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7688", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Holes Bay", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land at Sterte Avenue West, Poole", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH15 2AL", "X-coordinate": "400787", "Y-coordinate": "91856", "Planning Authority": "Poole Borough Council", "Planning Application Reference": "APP/17/00186/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/02/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/01/2023", "Under Construction": "01/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "50.726324", "long": "-1.990215", "status": "construction", "mw": 15, "ext_id": "7688"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "14/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7688", "Record Last Updated (dd/mm/yyyy)": "14/01/2020", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Holes Bay", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Sterte Avenue West, Poole", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH15 2AL", "X-coordinate": "400787", "Y-coordinate": "91856", "Planning Authority": "Poole Borough Council", "Planning Application Reference": "APP/17/00186/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/02/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/01/2023", "Under Construction": "01/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "50.726324", "long": "-1.990215", "status": "construction", "mw": 15, "ext_id": "7688"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holes Bay", "name_short": "Holes Bay", "owner": "Harmony Energy", "state": "south west", "country": "uk", "lat": "50.726324", "long": "-1.990215", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.726324+-1.990215", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 17"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Chingjia Energy", "city": "", "id": "1175", "external_id": "", "state": "", "country": "taiwan", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Chingjia Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.222065", "long": "120.945036", "coords_hint": "-2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1693770142554189983", "link2": "", "link3": "", "link4": ""}, "internal_id": "1175", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chingjia Energy", "name_short": "Chingjia", "owner": "Chingjia Energy", "state": "", "country": "taiwan", "lat": "24.222065", "long": "120.945036", "coords_hint": -2, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the country is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:24.222065+120.945036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/Tesla_Megapack/status/1693770142554189983"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Supernode Stage 1", "city": "brisbane", "id": "1390", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "520", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.318405", "long": "152.969631", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "link2": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link3": "https://x.com/FredericLambert/status/1811399467070894094", "link4": ""}, "internal_id": "1390", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 520, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Supernode Stage 1", "name_short": "Supernode Stage 1", "owner": "Quinbrook", "state": "queensland", "country": "australia", "lat": "-27.318405", "long": "152.969631", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.318405+152.969631", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer"], "links": ["https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "https://x.com/FredericLambert/status/1811399467070894094"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Supernode Stage 2", "city": "brisbane", "id": "1391", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "1040", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.320103", "long": "152.970537", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link2": "https://x.com/FredericLambert/status/1811399467070894094", "link3": "", "link4": ""}, "internal_id": "1391", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 1040, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Supernode Stage 2", "name_short": "Supernode Stage 2", "owner": "Quinbrook", "state": "queensland", "country": "australia", "lat": "-27.320103", "long": "152.970537", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.320103+152.970537", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer"], "links": ["https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "https://x.com/FredericLambert/status/1811399467070894094"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}]; + var projects = [{"csv": {"name": "Sendai", "city": "sendai", "id": "1374", "external_id": "", "state": "miyagi", "country": "japan", "capacity_mwh": "43", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Kenes", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "14", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.271948", "long": "140.833529", "coords_hint": "3", "use_case": "", "notes": "guessed the mw, assuming it is a 4h system", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1802738958679285856", "link2": "", "link3": "", "link4": ""}, "internal_id": "1374", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 11, "mwh_is_estimate": false, "mwh": 43, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "month_disappeared": "", "go_live": "2024-06", "go_live_year_int": 2024, "name": "Sendai", "name_short": "Sendai", "owner": "Kenes", "state": "miyagi", "country": "japan", "lat": "38.271948", "long": "140.833529", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:38.271948+140.833529", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 14, "notes_split": ["guessed the mw, assuming it is a 4h system"], "links": ["https://x.com/Tesla_Megapack/status/1802738958679285856"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Clay Tye", "city": "Upminster", "id": "76", "external_id": "", "state": "essex", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures (FRV)", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552193", "long": "0.297889", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "link2": "https://x.com/Tesla_Megapack/status/1775254497973202985", "link3": "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/", "link4": ""}, "internal_id": "76", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 99, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Clay Tye", "name_short": "Clay Tye", "owner": "", "state": "essex", "country": "uk", "lat": "51.552193", "long": "0.297889", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.552193+0.297889", "construction_time_month": 30, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "https://x.com/Tesla_Megapack/status/1775254497973202985", "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Jamesfield Farm", "city": "Abernethy", "id": "130", "external_id": "10863", "state": "fife", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "Tag Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "26", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://www.harmonyenergyplanning.co.uk/jamesfield/", "link3": "", "link4": ""}, "internal_id": "130", "external_id": "10863", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Jamesfield Organic Centre - Battery Storage", "external_id": "10863", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "construction", "date_first_heard": "2022-09-28", "start_construction": "2023-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "10863", "Record Last Updated (dd/mm/yyyy)": "07/06/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7315 & 10456", "Address": "140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth and Kinross Council", "Planning Application Reference": "22/00832/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "planning", "mw": 49, "ext_id": "10863"}, "first_month": "2022-07", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2022", "to": "12/01/2023", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Under Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "28/09/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2025", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/01/2023", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Planning Permission Expired", "from": "28/09/2025", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "12/01/2023", "to": "24/03/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Authority", "from": "Perth and Kinross Council", "to": "Perth & Kinross Council", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "10863", "Record Last Updated (dd/mm/yyyy)": "24/03/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Jamesfield Organic Centre - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7315 & 10456", "Address": "140 Metres North East Of Jamesfield Organic Centre Newburgh, Cupar", "County": "Perth and Kinross", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY14 6EW", "X-coordinate": "319852", "Y-coordinate": "718016", "Planning Authority": "Perth & Kinross Council", "Planning Application Reference": "22/00832/FLM", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "20/05/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "28/09/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "01/01/2023", "Operational": "", "Heat Network Ref": "", "lat": "56.347678", "long": "-3.298351", "status": "construction", "mw": 49, "ext_id": "10863"}, "current_month": "2024-01", "dates": {"first_heard": "2022-06-07", "start_construction": "2023-01-12", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-09-28", "start_construction": "2023-01-01", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Jamesfield Organic Centre - Battery Storage", "name_short": "Jamesfield Organic Centre", "owner": "Harmony Energy Storage", "state": "scotland", "country": "uk", "lat": "56.347678", "long": "-3.298351", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.347678+-3.298351", "construction_time_month": 14, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 26, "notes_split": ["extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article"], "links": ["https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "https://www.harmonyenergyplanning.co.uk/jamesfield/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Kogan Creek / Chinchilla", "city": "", "id": "691", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "CS Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "80", "status": "operation", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "cost_million": "150", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-26.917756", "long": "150.746113", "coords_hint": "2", "use_case": "", "notes": "used day of tweet as operation start date", "project_website": "", "link1": "https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "link2": "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "link3": "https://twitter.com/SawyerMerritt/status/1764791615061668146", "link4": ""}, "internal_id": "691", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2024-03", "go_live_year_int": 2024, "name": "Kogan Creek / Chinchilla", "name_short": "Kogan Creek / Chinchilla", "owner": "", "state": "queensland", "country": "australia", "lat": "-26.917756", "long": "150.746113", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-26.917756+150.746113", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 80, "notes_split": ["used day of tweet as operation start date"], "links": ["https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "https://twitter.com/SawyerMerritt/status/1764791615061668146"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "EReserve 1-9 (9 different locations)", "city": "", "id": "13", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "315", "estimate_mwh": "", "power_mw": "180", "customer": "WCSB Power", "owner": "Enfinite", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "55.740245", "long": "-118.700003", "coords_hint": "1", "use_case": "", "notes": "eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ** the mwh number is from the twitter post", "project_website": "https://ereserve-project.com/", "link1": "http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "link2": "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "link3": "https://x.com/Tesla_Megapack/status/1781467958218469840", "link4": "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"}, "internal_id": "13", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 180, "mwh_is_estimate": false, "mwh": 315, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "month_disappeared": "", "go_live": "2024-02", "go_live_year_int": 2024, "name": "EReserve 1-9 (9 different locations)", "name_short": "EReserve 1-9 (9 different locations...", "owner": "Enfinite", "state": "alberta", "country": "canada", "lat": "55.740245", "long": "-118.700003", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:55.740245+-118.700003", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ", " the mwh number is from the twitter post"], "links": ["http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "https://x.com/Tesla_Megapack/status/1781467958218469840", "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Goleta Energy Storage Project", "city": "Goleta", "id": "34", "external_id": "66394", "state": "california", "country": "usa", "capacity_mwh": "160", "estimate_mwh": "", "power_mw": "60", "customer": "Goleta Energy Storage, LLC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "62", "status": "operation", "date_first_heard": "2019-11-13", "start_construction": "", "start_operation": "2023-12-05", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.43274", "long": "-119.869283", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "the planning document on the website has a lot of detail", "project_website": "https://www.cityofgoleta.org/city-hall/planning-and-environmental-review/ceqa-review/cortona-battery-storage-project", "link1": "https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2", "link2": "", "link3": "", "link4": ""}, "internal_id": "34", "external_id": "66394", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Goleta Energy Storage, LLC", "external_id": "66394", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 120, "power_mw": 60, "owner": "Goleta Energy Storage, LLC", "status": "operation", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GOLET": {"first": {"year": "2023", "month": "4", "entity id": "65479", "entity name": "Goleta Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Goleta Energy Storage, LLC", "plant state": "CA", "plant id": "66394", "generator id": "GOLET", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66394", "date": "2023-04", "mw": 60}, "first_month": "2023-04", "changes": [{"month": "2023-05", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-04", "to": "2023-10", "extra": "delayed by 6 months", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-10", "to": "2023-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "date", "from": "2023-11", "to": "2023-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-12", "to": "2024-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "1", "entity id": "65479", "entity name": "Goleta Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Goleta Energy Storage, LLC", "plant state": "CA", "plant id": "66394", "generator id": "GOLET", "net summer capacity (mw)": "60", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66394", "date": "2024-01", "mw": 60}, "current_month": "2024-06", "dates": {"first_heard": "2023-04", "start_construction": "2023-07"}, "month_disappeared": ""}}, "mw": 60, "mwh_is_estimate": false, "mwh": 160, "mwh_estimate": 120, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-04", "start_construction": "2023-07", "start_operation": "2024-01", "start_estimated": "", "month_disappeared": "", "go_live": "2024-01", "go_live_year_int": 2024, "name": "Goleta Energy Storage, LLC", "name_short": "Goleta Energy Storage", "owner": "Goleta Energy Storage, LLC", "state": "california", "country": "usa", "lat": "34.43274", "long": "-119.869283", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.43274+-119.869283", "construction_time_month": 6, "construction_speed_mwh_per_month": 26, "no_of_battery_units": 62, "notes_split": ["the planning document on the website has a lot of detail"], "links": ["https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Kapolei Energy Storage", "city": "", "id": "1", "external_id": "66067", "state": "hawaii", "country": "usa", "capacity_mwh": "565", "estimate_mwh": "", "power_mw": "185", "customer": "Hawaiian Electric", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "158", "status": "operation", "date_first_heard": "", "start_construction": "2021-08-25", "start_operation": "2024-01-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.328169", "long": "-158.105085", "coords_hint": "1", "use_case": "island, black start", "notes": "", "project_website": "https://www.kapoleienergystorage.com/overview", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "link2": "https://twitter.com/Tesla_Megapack/status/1745499330612748482", "link3": "", "link4": ""}, "internal_id": "1", "external_id": "66067", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Kapolei Energy Storage", "external_id": "66067", "state": "hawaii", "country": "usa", "mwh": 0, "estimate_mwh": 370, "power_mw": 185, "owner": "Kapolei Energy Storage I, LLC", "status": "operation", "date_first_heard": "2023-01", "start_construction": "", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"KES1": {"first": {"year": "2023", "month": "5", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Kapolei Energy Storage", "plant state": "HI", "plant id": "66067", "generator id": "KES1", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66067", "date": "2023-05", "mw": 185}, "first_month": "2023-01", "changes": [{"month": "2023-02", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-06", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-07", "to": "2023-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "(TS) Construction complete, but not yet in commercial operation", "extra": "", "change_type": "misc"}]}, {"month": "2023-10", "li": [{"name": "date", "from": "2023-08", "to": "2023-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(TS) Construction complete, but not yet in commercial operation", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "12", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "plant producer type": "IPP", "plant name": "Kapolei Energy Storage", "plant state": "HI", "plant id": "66067", "generator id": "KES1", "net summer capacity (mw)": "185", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "66067", "date": "2023-12", "mw": 185}, "current_month": "2024-02", "dates": {"first_heard": "2023-01", "start_construction": null}, "month_disappeared": ""}}, "mw": 185, "mwh_is_estimate": false, "mwh": 565, "mwh_estimate": 370, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2023-01", "start_construction": "2021-08-25", "start_operation": "2023-12", "start_estimated": "", "month_disappeared": "", "go_live": "2023-12", "go_live_year_int": 2023, "name": "Kapolei Energy Storage", "name_short": "Kapolei", "owner": "Kapolei Energy Storage I, LLC", "state": "hawaii", "country": "usa", "lat": "21.328169", "long": "-158.105085", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:21.328169+-158.105085", "construction_time_month": 28, "construction_speed_mwh_per_month": 20, "no_of_battery_units": 158, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "https://twitter.com/Tesla_Megapack/status/1745499330612748482"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bouldercombe", "city": "", "id": "119", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Genex Power", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "40", "status": "operation", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-23.537188", "long": "150.48991", "coords_hint": "3", "use_case": "", "notes": "used the date of the tweet as operation start date", "project_website": "https://www.genexpower.com.au/bouldercombe-battery-project.html", "link1": "https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "link2": "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "link3": "https://twitter.com/SawyerMerritt/status/1722857295078383700", "link4": ""}, "internal_id": "119", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "month_disappeared": "", "go_live": "2023-11", "go_live_year_int": 2023, "name": "Bouldercombe", "name_short": "Bouldercombe", "owner": "Genex Power", "state": "queensland", "country": "australia", "lat": "-23.537188", "long": "150.48991", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-23.537188+150.48991", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 40, "notes_split": ["used the date of the tweet as operation start date"], "links": ["https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "https://twitter.com/SawyerMerritt/status/1722857295078383700"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Riverina 1 + 2 / Darlington Point Energy Storage", "city": "Darlington Point", "id": "45", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "Edify Energy / Shell", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.646927", "long": "146.03516", "coords_hint": "1", "use_case": "333MW solar farm support", "notes": "it says on the project website that the 3 projects are colocated, so combined them here into just one entry", "project_website": "https://edifyenergy.com/project/riverina-darlington-point/", "link1": "https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "link2": "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "link3": "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "link4": "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"}, "internal_id": "45", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Riverina 1 + 2 / Darlington Point Energy Storage", "name_short": "Riverina 1 + 2 / Darlington Point", "owner": "", "state": "new south wales", "country": "australia", "lat": "-34.646927", "long": "146.03516", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.646927+146.03516", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["it says on the project website that the 3 projects are colocated, so combined them here into just one entry"], "links": ["https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Little Raith (Glenniston)", "city": "Auchtertool", "id": "824", "external_id": "11808", "state": "fife", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49.5", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-little-raith-bess/", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary", "link3": "", "link4": ""}, "internal_id": "824", "external_id": "11808", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Gleniston, Auchtertool - Battery Storage Facility", "external_id": "11808", "state": "scotland", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Limited", "status": "planning", "date_first_heard": "2022-11-09", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "11808", "Record Last Updated (dd/mm/yyyy)": "08/08/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Gleniston, Auchtertool - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Battery Storage Facility Gleniston Auchtertool ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "22/02323/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 49, "ext_id": "11808"}, "first_month": "2022-10", "changes": [{"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "08/08/2022", "to": "11/11/2022", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "09/11/2025", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "11808", "Record Last Updated (dd/mm/yyyy)": "11/11/2022", "Operator (or Applicant)": "Harmony Energy Limited", "Site Name": "Gleniston, Auchtertool - Battery Storage Facility", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Battery Storage Facility Gleniston Auchtertool ", "County": "Fife", "Region": "Scotland", "Country": "Scotland", "Post Code": "KY5 0AX", "X-coordinate": "321044", "Y-coordinate": "691852", "Planning Authority": "Fife Council", "Planning Application Reference": "22/02323/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/07/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "09/11/2022", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "09/11/2025", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "56.11287", "long": "-3.271262", "status": "planning", "mw": 49, "ext_id": "11808"}, "current_month": "2024-01", "dates": {"first_heard": "2022-08-08", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 99, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-11-09", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Gleniston, Auchtertool - Battery Storage Facility", "name_short": "Gleniston, Auchtertool", "owner": "Harmony Energy Limited", "state": "scotland", "country": "uk", "lat": "56.11287", "long": "-3.271262", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:56.11287+-3.271262", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Bumpers", "city": "Princes Risborough", "id": "844", "external_id": "", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "56", "status": "operation", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.7485", "long": "-0.88913", "coords_hint": "1", "use_case": "", "notes": "Construction dates from TTRO application", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-bumpers-bess/", "link1": "https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "link2": "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "link3": "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "link4": "https://twitter.com/heitplc/status/1679460677226823680"}, "internal_id": "844", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 99, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "month_disappeared": "", "go_live": "2023-10", "go_live_year_int": 2023, "name": "Bumpers", "name_short": "Bumpers", "owner": "Harmony Energy Income Trust", "state": "buckinghamshire", "country": "uk", "lat": "51.7485", "long": "-0.88913", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.7485+-0.88913", "construction_time_month": 12, "construction_speed_mwh_per_month": 16, "no_of_battery_units": 56, "notes_split": ["Construction dates from TTRO application"], "links": ["https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "https://twitter.com/heitplc/status/1679460677226823680"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Arroyo", "city": "McKinley County", "id": "101", "external_id": "63172", "state": "new mexico", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "PNM", "owner": "DE Shaw Renewable Investments (DSRI)", "developer": "Affordable Solar", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-03", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "450", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.9703", "long": "-107.5631", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ** the testimony link has a lot of info ** got the location info from the gem wiki", "project_website": "", "link1": "https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "link2": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link3": "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "link4": "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"}, "internal_id": "101", "external_id": "63172", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Arroyo Solar Energy Storage Hybrid", "external_id": "63172", "state": "new mexico", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Arroyo Solar LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-10", "start_operation": "2023-07", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ARESS": {"first": {"year": "2022", "month": "6", "entity id": "62921", "entity name": "Arroyo Solar LLC", "plant producer type": "IPP", "plant name": "Arroyo Solar Energy Storage Hybrid", "plant state": "NM", "plant id": "63172", "generator id": "ARESS", "net summer capacity (mw)": "40", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "63172", "date": "2022-06", "mw": 40}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "mw", "from": 40, "to": 150, "extra": "", "change_type": "misc"}]}, {"month": "2021-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2022-06", "to": "2022-08", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "date", "from": "2022-08", "to": "2022-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-07", "li": [{"name": "date", "from": "2022-10", "to": "2022-12", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-12", "to": "2023-02", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-04", "li": [{"name": "date", "from": "2023-02", "to": "2023-04", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2023-04", "to": "2023-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-07", "li": [{"name": "date", "from": "2023-05", "to": "2023-06", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-08", "li": [{"name": "date", "from": "2023-06", "to": "2023-07", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2023", "month": "7", "entity id": "62921", "entity name": "Arroyo Solar LLC", "plant producer type": "IPP", "plant name": "Arroyo Solar Energy Storage Hybrid", "plant state": "NM", "plant id": "63172", "generator id": "ARESS", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63172", "date": "2023-07", "mw": 150}, "current_month": "2024-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-10"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-10", "start_operation": "2023-07", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Arroyo Solar Energy Storage Hybrid", "name_short": "Arroyo Solar", "owner": "Arroyo Solar LLC", "state": "new mexico", "country": "usa", "lat": "35.9703", "long": "-107.5631", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.9703+-107.5631", "construction_time_month": 21, "construction_speed_mwh_per_month": 28, "no_of_battery_units": 0, "notes_split": ["2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ", " the testimony link has a lot of info ", " got the location info from the gem wiki"], "links": ["https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Gigafactory Texas", "city": "", "id": "1176", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "125", "customer": "", "owner": "Tesla", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "68", "status": "operation", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.230756", "long": "-97.615973", "coords_hint": "1", "use_case": "", "notes": "used date of tweet for the operation start date", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1681503667030212608", "link2": "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "link3": "https://twitter.com/SawyerMerritt/status/1682834256928571392", "link4": "https://x.com/Tesla_Megapack/status/1791530954261172681"}, "internal_id": "1176", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 125, "mwh_is_estimate": false, "mwh": 250, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "month_disappeared": "", "go_live": "2023-07", "go_live_year_int": 2023, "name": "Gigafactory Texas", "name_short": "Gigafactory Texas", "owner": "Tesla", "state": "texas", "country": "usa", "lat": "30.230756", "long": "-97.615973", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:30.230756+-97.615973", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 68, "notes_split": ["used date of tweet for the operation start date"], "links": ["https://twitter.com/Tesla_Megapack/status/1681503667030212608", "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "https://twitter.com/SawyerMerritt/status/1682834256928571392", "https://x.com/Tesla_Megapack/status/1791530954261172681"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Chapel Farm", "city": "Luton", "id": "129", "external_id": "7058", "state": "bedfordshire", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Tag Energy", "developer": "Harmony Energy", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "51.925835", "long": "-0.49999903", "coords_hint": "0", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://twitter.com/Tesla_Megapack/status/1669479285848182784", "link3": "", "link4": ""}, "internal_id": "129", "external_id": "7058", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Chapel Farm", "external_id": "7058", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy", "status": "planning", "date_first_heard": "2019-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.925834", "long": "-0.499999", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7058", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Chapel Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ ", "X-coordinate": "503243", "Y-coordinate": "226320", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/18/01795/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.925834", "long": "-0.499999", "status": "planning", "mw": 49, "ext_id": "7058"}, "first_month": "2021-09", "changes": [{"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2019", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "13/06/2019", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7058", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Chapel Farm", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Chapel Farm, Luton Road, Chalton, Luton, Bedfordshire", "County": "Bedfordshire", "Region": "Eastern", "Country": "England", "Post Code": "LU4 9UJ ", "X-coordinate": "503243", "Y-coordinate": "226320", "Planning Authority": "Central Bedfordshire Council", "Planning Application Reference": "CB/18/01795/FULL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/05/2018", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "18/01/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "18/01/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.925834", "long": "-0.499999", "status": "planning", "mw": 49, "ext_id": "7058"}, "current_month": "2024-01", "dates": {"first_heard": "2019-06-13", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 99, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-01-18", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-06", "go_live_year_int": 2023, "name": "Chapel Farm", "name_short": "Chapel Farm", "owner": "Harmony Energy", "state": "eastern", "country": "uk", "lat": "51.925834", "long": "-0.499999", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.925834+-0.499999", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article"], "links": ["https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "https://twitter.com/Tesla_Megapack/status/1669479285848182784"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Farnham", "city": "Farnham", "id": "847", "external_id": "", "state": "surrey", "country": "uk", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.18894", "long": "-0.82903032", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "link3": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/", "link4": ""}, "internal_id": "847", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "month_disappeared": "", "go_live": "2023-05", "go_live_year_int": 2023, "name": "Farnham", "name_short": "Farnham", "owner": "Harmony Energy Income Trust", "state": "surrey", "country": "uk", "lat": "51.18894", "long": "-0.82903032", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.18894+-0.82903032", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "California Flats", "city": "monterey county", "id": "4", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "130", "customer": "Apple", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "85", "status": "operation", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.87009", "long": "-120.326403", "coords_hint": "1", "use_case": "130MW solar farm support", "notes": "used the release date of the youtube video as the operation start date", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "link2": "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "link3": "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "link4": "https://www.youtube.com/watch?v=SA3SdlKBtyc"}, "internal_id": "4", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 130, "mwh_is_estimate": false, "mwh": 240, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "month_disappeared": "", "go_live": "2023-04", "go_live_year_int": 2023, "name": "California Flats", "name_short": "California Flats", "owner": "", "state": "california", "country": "usa", "lat": "35.87009", "long": "-120.326403", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.87009+-120.326403", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 85, "notes_split": ["used the release date of the youtube video as the operation start date"], "links": ["https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "https://www.youtube.com/watch?v=SA3SdlKBtyc"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Lessines", "city": "", "id": "843", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "Corsica Sole", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "cost_million": "33", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "50.72743", "long": "3.854307", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://insideevs.com/news/625965/tesla-megapack-battery-belgium/", "link2": "", "link3": "", "link4": ""}, "internal_id": "843", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Lessines", "name_short": "Lessines", "owner": "", "state": "", "country": "belgium", "lat": "50.72743", "long": "3.854307", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.72743+3.854307", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://insideevs.com/news/625965/tesla-megapack-battery-belgium/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Broadditch", "city": "Southfleet", "id": "845", "external_id": "", "state": "kent", "country": "uk", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.41493", "long": "0.32622", "coords_hint": "1", "use_case": "", "notes": "uses the megapack xl", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf", "link3": "", "link4": ""}, "internal_id": "845", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 11, "mwh_is_estimate": false, "mwh": 22, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "month_disappeared": "", "go_live": "2022-12", "go_live_year_int": 2022, "name": "Broadditch", "name_short": "Broadditch", "owner": "Harmony Energy Income Trust", "state": "kent", "country": "uk", "lat": "51.41493", "long": "0.32622", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.41493+0.32622", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 6, "notes_split": ["uses the megapack xl"], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Pillswood Phase 1", "city": "Cottingham", "id": "299", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": ""}, "internal_id": "299", "external_id": "7005", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pillswood Phase 1 ", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.801332", "long": "-0.415133", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7005", "Record Last Updated (dd/mm/yyyy)": "13/06/2019", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Creyke Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504478", "Y-coordinate": "435057", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01993/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.801332", "long": "-0.415133", "status": "planning", "mw": 49, "ext_id": "7005"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Development Status", "from": "Planning Permission Granted", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Revised", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "", "to": "7360", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "17/11/2020", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "13/06/2019", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Creyke Substation", "to": "Pillswood Phase 1 ", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Revised", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Revised", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (New REPD Ref)", "from": "7360", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "09/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7005", "Record Last Updated (dd/mm/yyyy)": "09/11/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Pillswood Phase 1 ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land South East Of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504478", "Y-coordinate": "435057", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "17/01993/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "06/04/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "17/11/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "17/11/2020", "Under Construction": "01/04/2022", "Operational": "01/11/2022", "Heat Network Ref": "", "lat": "53.801332", "long": "-0.415133", "status": "operation", "mw": 49, "ext_id": "7005"}, "current_month": "2024-01", "dates": {"first_heard": "2019-06-13", "start_construction": "", "start_operation": "2022-11-09"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-11-17", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Pillswood Phase 1 ", "name_short": "Pillswood Phase 1 ", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.801332", "long": "-0.415133", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.801332+-0.415133", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 39, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Pillswood Phase 2", "city": "Cottingham", "id": "846", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Tesla", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": "https://twitter.com/Tesla_Megapack/status/1661649261757612032"}, "internal_id": "846", "external_id": "7360", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Pillswood Phase 2", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Harmony Energy Storage", "status": "operation", "date_first_heard": "2019-11-14", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "lat": "53.802281", "long": "-0.416949", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7360", "Record Last Updated (dd/mm/yyyy)": "31/01/2020", "Operator (or Applicant)": "Northern Powergrid", "Site Name": "Creyke Beck Substation", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Address": "Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504356", "Y-coordinate": "435160", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "19/01449/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2022", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.802281", "long": "-0.416949", "status": "planning", "mw": 49, "ext_id": "7360"}, "first_month": "2021-09", "changes": [{"month": "2022-10", "li": [{"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7005", "extra": "", "change_type": "misc"}]}, {"month": "2023-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "31/01/2020", "to": "09/11/2022", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Northern Powergrid", "to": "Harmony Energy Storage", "extra": "", "change_type": "misc"}, {"name": "Site Name", "from": "Creyke Beck Substation", "to": "Pillswood Phase 2", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Permission Granted", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Awaiting Construction", "to": "Operational", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "7005", "to": "", "extra": "", "change_type": "misc"}, {"name": "Under Construction", "from": "", "to": "01/04/2022", "extra": "", "change_type": "misc"}, {"name": "Operational", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}, {"name": "status", "from": "planning", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "09/11/2022", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "01/11/2022", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7360", "Record Last Updated (dd/mm/yyyy)": "01/11/2022", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Pillswood Phase 2", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Operational", "Development Status (short)": "Operational", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Creyke Beck Substation 4875, Park Lane, Cottingham, Humberside", "County": "Humberside", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "HU16 5SB", "X-coordinate": "504356", "Y-coordinate": "435160", "Planning Authority": "East Riding of Yorkshire Council", "Planning Application Reference": "19/01449/STPLF", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "23/05/2019", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/11/2019", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/11/2022", "Under Construction": "01/04/2022", "Operational": "01/11/2022", "Heat Network Ref": "", "lat": "53.802281", "long": "-0.416949", "status": "operation", "mw": 49, "ext_id": "7360"}, "current_month": "2024-01", "dates": {"first_heard": "2020-01-31", "start_construction": "", "start_operation": "2022-11-09"}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 98, "mwh_estimate": 49, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2019-11-14", "start_construction": "2022-04-01", "start_operation": "2022-11-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-11", "go_live_year_int": 2022, "name": "Pillswood Phase 2", "name_short": "Pillswood Phase 2", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.802281", "long": "-0.416949", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.802281+-0.416949", "construction_time_month": 7, "construction_speed_mwh_per_month": 14, "no_of_battery_units": 39, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "https://twitter.com/Tesla_Megapack/status/1661649261757612032"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Moss landing / Elkhorn", "city": "close to santa cruz", "id": "7", "external_id": "62564", "state": "california", "country": "usa", "capacity_mwh": "730", "estimate_mwh": "", "power_mw": "182", "customer": "PG&E", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "256", "status": "operation", "date_first_heard": "", "start_construction": "2020-07-01", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.807971", "long": "-121.781701", "coords_hint": "1", "use_case": "", "notes": "in 2020, 64mwh were added", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "link2": "https://en.wikipedia.org/wiki/Tesla_Megapack", "link3": "", "link4": ""}, "internal_id": "7", "external_id": "62564", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Elkhorn Battery Energy Storage System", "external_id": "62564", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 364, "power_mw": 182, "owner": "Pacific Gas & Electric Co.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ELKHO": {"first": {"year": "2021", "month": "3", "entity id": "14328", "entity name": "Pacific Gas & Electric Co.", "plant producer type": "Electric Utility", "plant name": "Elkhorn Battery Energy Storage System", "plant state": "CA", "plant id": "62564", "generator id": "ELKHO", "net summer capacity (mw)": "182.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "62564", "date": "2021-03", "mw": 182}, "first_month": "2020-09", "changes": [{"month": "2020-12", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-03", "to": "2021-07", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-07", "to": "2021-08", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-10", "li": [{"name": "date", "from": "2021-08", "to": "2021-10", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2021-11", "li": [{"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "date", "from": "2022-01", "to": "2022-03", "extra": "delayed by 2 months", "change_type": "timing"}]}, {"month": "2022-05", "li": [{"name": "date", "from": "2022-03", "to": "2022-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "4", "entity id": "14328", "entity name": "Pacific Gas & Electric Co.", "plant producer type": "Electric Utility", "plant name": "Elkhorn Battery Energy Storage System", "plant state": "CA", "plant id": "62564", "generator id": "ELKHO", "net summer capacity (mw)": "182.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62564", "date": "2022-04", "mw": 182}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-12"}, "month_disappeared": ""}}, "mw": 182, "mwh_is_estimate": false, "mwh": 730, "mwh_estimate": 364, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-12", "start_operation": "2022-04", "start_estimated": "", "month_disappeared": "", "go_live": "2022-04", "go_live_year_int": 2022, "name": "Elkhorn Battery Energy Storage System", "name_short": "Elkhorn Battery", "owner": "Pacific Gas & Electric Co.", "state": "california", "country": "usa", "lat": "36.807971", "long": "-121.781701", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.807971+-121.781701", "construction_time_month": 16, "construction_speed_mwh_per_month": 45, "no_of_battery_units": 256, "notes_split": ["in 2020, 64mwh were added"], "links": ["https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "https://en.wikipedia.org/wiki/Tesla_Megapack"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Alaska Soldotna", "city": "Soldotna Power Plant", "id": "23", "external_id": "57206", "state": "alaska", "country": "usa", "capacity_mwh": "93", "estimate_mwh": "", "power_mw": "46", "customer": "Homer Electric Association", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "37", "status": "operation", "date_first_heard": "2019-12-03", "start_construction": "", "start_operation": "2021-07-23", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "60.500441", "long": "-150.996312", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "link2": "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/", "link3": "", "link4": ""}, "internal_id": "23", "external_id": "57206", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Soldotna", "external_id": "57206", "state": "alaska", "country": "usa", "mwh": 0, "estimate_mwh": 92, "power_mw": 46, "owner": "Homer Electric Assn Inc", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"3": {"first": {"year": "2021", "month": "9", "entity id": "19558", "entity name": "Homer Electric Assn Inc", "plant producer type": "Electric Utility", "plant name": "Soldotna", "plant state": "AK", "plant id": "57206", "generator id": "3", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "57206", "date": "2021-09", "mw": 46}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-09", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-10", "to": "2021-11", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "date", "from": "2021-12", "to": "2022-01", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-03", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2022", "month": "1", "entity id": "19558", "entity name": "Homer Electric Assn Inc", "plant producer type": "Electric Utility", "plant name": "Soldotna", "plant state": "AK", "plant id": "57206", "generator id": "3", "net summer capacity (mw)": "46.5", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "57206", "date": "2022-01", "mw": 46}, "current_month": "2023-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 46, "mwh_is_estimate": false, "mwh": 93, "mwh_estimate": 92, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2022-01", "start_estimated": "", "month_disappeared": "", "go_live": "2022-01", "go_live_year_int": 2022, "name": "Soldotna", "name_short": "Soldotna", "owner": "Homer Electric Assn Inc", "state": "alaska", "country": "usa", "lat": "60.500441", "long": "-150.996312", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:60.500441+-150.996312", "construction_time_month": 14, "construction_speed_mwh_per_month": 6, "no_of_battery_units": 37, "notes_split": [""], "links": ["https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Victorian Big Battery", "city": "geelong", "id": "2", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "450", "estimate_mwh": "", "power_mw": "300", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "212", "status": "operation", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.037741", "long": "144.290949", "coords_hint": "1", "use_case": "", "notes": "incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ** 2021-09-03 moving project back to construction", "project_website": "https://victorianbigbattery.com.au/", "link1": "https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "link2": "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "link3": "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "link4": "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"}, "internal_id": "2", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 300, "mwh_is_estimate": false, "mwh": 450, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Victorian Big Battery", "name_short": "Victorian Big Battery", "owner": "", "state": "victoria", "country": "australia", "lat": "-38.037741", "long": "144.290949", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-38.037741+144.290949", "construction_time_month": 11, "construction_speed_mwh_per_month": 40, "no_of_battery_units": 212, "notes_split": ["incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ", " 2021-09-03 moving project back to construction"], "links": ["https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wallgrove Grid Battery", "city": "Wallgrove / Sydney", "id": "12", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "75", "estimate_mwh": "", "power_mw": "50", "customer": "TransGrid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "cost_million": "65", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-33.817659", "long": "150.828087", "coords_hint": "1", "use_case": "FCAS, synthetic inertia", "notes": "", "project_website": "https://www.transgrid.com.au/wallgrovebattery", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "link2": "https://arena.gov.au/projects/transgrid-wallgrove-battery/", "link3": "", "link4": ""}, "internal_id": "12", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 75, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Wallgrove Grid Battery", "name_short": "Wallgrove Grid Battery", "owner": "", "state": "new south wales", "country": "australia", "lat": "-33.817659", "long": "150.828087", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.817659+150.828087", "construction_time_month": 10, "construction_speed_mwh_per_month": 7, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "https://arena.gov.au/projects/transgrid-wallgrove-battery/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Townsite Solar Project Hybrid", "city": "", "id": "228", "external_id": "60654", "state": "nevada", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "180", "power_mw": "90", "customer": "Arevon", "owner": "Townsite Solar, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.935805", "long": "-114.869386", "coords_hint": "1", "use_case": "190MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesla.com/videos/townsite-solar-storage", "link2": "https://arevonenergy.com/location/townsite/", "link3": "", "link4": ""}, "internal_id": "228", "external_id": "60654", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Townsite Solar Project Hybrid", "external_id": "60654", "state": "nevada", "country": "usa", "mwh": 0, "estimate_mwh": 180, "power_mw": 90, "owner": "Townsite Solar, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN02": {"first": {"year": "2021", "month": "11", "entity id": "60387", "entity name": "Townsite Solar, LLC", "plant producer type": "IPP", "plant name": "Townsite Solar Project Hybrid", "plant state": "NV", "plant id": "60654", "generator id": "GEN02", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "60654", "date": "2021-11", "mw": 90}, "first_month": "2020-09", "changes": [{"month": "2021-08", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2022-01", "li": [{"name": "date", "from": "2021-11", "to": "2021-12", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2022-02", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "12", "entity id": "60387", "entity name": "Townsite Solar, LLC", "plant producer type": "IPP", "plant name": "Townsite Solar Project Hybrid", "plant state": "NV", "plant id": "60654", "generator id": "GEN02", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "60654", "date": "2021-12", "mw": 90}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-08"}, "month_disappeared": ""}}, "mw": 90, "mwh_is_estimate": false, "mwh": 360, "mwh_estimate": 180, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-08", "start_operation": "2021-12", "start_estimated": "2021-11", "month_disappeared": "", "go_live": "2021-12", "go_live_year_int": 2021, "name": "Townsite Solar Project Hybrid", "name_short": "Townsite Solar", "owner": "Townsite Solar, LLC", "state": "nevada", "country": "usa", "lat": "35.935805", "long": "-114.869386", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.935805+-114.869386", "construction_time_month": 4, "construction_speed_mwh_per_month": 90, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesla.com/videos/townsite-solar-storage", "https://arevonenergy.com/location/townsite/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Contego", "city": "Hurstpierpoint", "id": "35", "external_id": "", "state": "west sussex", "country": "uk", "capacity_mwh": "68", "estimate_mwh": "", "power_mw": "34", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "28", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.955104", "long": "-0.163008", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.harmonyenergy.co.uk/projects/", "link1": "https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "link2": "https://www.youtube.com/watch?v=zh6PFeObrHs", "link3": "", "link4": ""}, "internal_id": "35", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 34, "mwh_is_estimate": false, "mwh": 68, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Contego", "name_short": "Contego", "owner": "", "state": "west sussex", "country": "uk", "lat": "50.955104", "long": "-0.163008", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.955104+-0.163008", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 28, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "https://www.youtube.com/watch?v=zh6PFeObrHs"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Agua Fria / Bolster Substation", "city": "Glendale / Phoenix", "id": "111", "external_id": "141", "state": "arizona", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "Salt River Project (SRP)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "32", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.553691", "long": "-112.212654", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "link2": "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/", "link3": "", "link4": ""}, "internal_id": "111", "external_id": "141", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Agua Fria", "external_id": "141", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 50, "power_mw": 25, "owner": "Salt River Project", "status": "operation", "date_first_heard": "2021-10", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"AFSB1": {"first": {"year": "2021", "month": "9", "entity id": "16572", "entity name": "Salt River Project", "plant producer type": "Electric Utility", "plant name": "Agua Fria", "plant state": "AZ", "plant id": "141", "generator id": "AFSB1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "141", "date": "2021-09", "mw": 25}, "first_month": "2021-10", "changes": [{"month": "2021-11", "li": [{"name": "date", "from": "2021-09", "to": "2021-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-12", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-10", "to": "2021-09", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "9", "entity id": "16572", "entity name": "Salt River Project", "plant producer type": "Electric Utility", "plant name": "Agua Fria", "plant state": "AZ", "plant id": "141", "generator id": "AFSB1", "net summer capacity (mw)": "25", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "141", "date": "2021-09", "mw": 25}, "current_month": "2022-02", "dates": {"first_heard": "2021-10", "start_construction": null}, "month_disappeared": ""}}, "mw": 25, "mwh_is_estimate": false, "mwh": 100, "mwh_estimate": 50, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-10", "start_construction": "", "start_operation": "2021-09", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Agua Fria", "name_short": "Agua Fria", "owner": "Salt River Project", "state": "arizona", "country": "usa", "lat": "33.553691", "long": "-112.212654", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.553691+-112.212654", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 32, "notes_split": [""], "links": ["https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Mohammed bin Rashid Al Maktoum Solar Park", "city": "Dubai", "id": "118", "external_id": "", "state": "", "country": "uae", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "1", "customer": "", "owner": "Dubai Electricity and Water Authority (DEWA)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.765375", "long": "55.367443", "coords_hint": "0", "use_case": "1000MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "link2": "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/", "link3": "", "link4": ""}, "internal_id": "118", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 1, "mwh_is_estimate": false, "mwh": 8, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "month_disappeared": "", "go_live": "2021-09", "go_live_year_int": 2021, "name": "Mohammed bin Rashid Al Maktoum Solar Park", "name_short": "Mohammed bin Rashid Al Maktoum Sola...", "owner": "Dubai Electricity and Water Authority (DEWA)", "state": "", "country": "uae", "lat": "24.765375", "long": "55.367443", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:24.765375+55.367443", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Gambit", "city": "angleton / houston", "id": "6", "external_id": "64528", "state": "texas", "country": "usa", "capacity_mwh": "175", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-08", "start_construction": "2021-03-08", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.168189", "long": "-95.445369", "coords_hint": "1", "use_case": "tesla as energy providor", "notes": "drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger", "project_website": "https://www.gambit-energystorage.com/", "link1": "https://www.teslarati.com/tesla-texas-big-battery-report/", "link2": "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "link3": "https://www.youtube.com/watch?v=OottNRdebs8", "link4": "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"}, "internal_id": "6", "external_id": "64528", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Gambit Energy Storage - Angleton Storage", "external_id": "64528", "state": "texas", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Tesla Inc.", "status": "operation", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"1": {"first": {"year": "2021", "month": "6", "entity id": "60947", "entity name": "Tesla Inc.", "plant producer type": "IPP", "plant name": "Gambit Energy Storage - Angleton Storage", "plant state": "TX", "plant id": "64528", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "64528", "date": "2021-06", "mw": 100}, "first_month": "2021-04", "changes": [{"month": "2021-06", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-08", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "6", "entity id": "60947", "entity name": "Tesla Inc.", "plant producer type": "IPP", "plant name": "Gambit Energy Storage - Angleton Storage", "plant state": "TX", "plant id": "64528", "generator id": "1", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "64528", "date": "2021-06", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2021-04", "start_construction": "2021-06"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 175, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2021-04", "start_construction": "2021-06", "start_operation": "2021-06", "start_estimated": "", "month_disappeared": "", "go_live": "2021-06", "go_live_year_int": 2021, "name": "Gambit Energy Storage - Angleton Storage", "name_short": "Gambit Energy Storage - Angleton", "owner": "Tesla Inc.", "state": "texas", "country": "usa", "lat": "29.168189", "long": "-95.445369", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:29.168189+-95.445369", "construction_time_month": 0, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger"], "links": ["https://www.teslarati.com/tesla-texas-big-battery-report/", "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "https://www.youtube.com/watch?v=OottNRdebs8", "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Saticoy", "city": "oxnard / los angeles", "id": "3", "external_id": "63891", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Arevon", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "142", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-06-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.25773", "long": "-119.158534", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "", "project_website": "", "link1": "https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "link2": "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "link3": "https://arevonenergy.com/location/saticoy/", "link4": ""}, "internal_id": "3", "external_id": "63891", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Saticoy", "external_id": "63891", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 200, "power_mw": 100, "owner": "Ventura Energy Storage, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SATCY": {"first": {"year": "2021", "month": "4", "entity id": "63550", "entity name": "Ventura Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Saticoy", "plant state": "CA", "plant id": "63891", "generator id": "SATCY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "63891", "date": "2021-04", "mw": 100}, "first_month": "2020-09", "changes": [{"month": "2020-11", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-04", "to": "2021-05", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-05", "to": "2021-04", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "4", "entity id": "63550", "entity name": "Ventura Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Saticoy", "plant state": "CA", "plant id": "63891", "generator id": "SATCY", "net summer capacity (mw)": "100", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63891", "date": "2021-04", "mw": 100}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2020-11"}, "month_disappeared": ""}}, "mw": 100, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 200, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Saticoy", "name_short": "Saticoy", "owner": "Ventura Energy Storage, LLC", "state": "california", "country": "usa", "lat": "34.25773", "long": "-119.158534", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.25773+-119.158534", "construction_time_month": 5, "construction_speed_mwh_per_month": 80, "no_of_battery_units": 142, "notes_split": [""], "links": ["https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "https://arevonenergy.com/location/saticoy/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Silverstrand Grid Energy Storage System", "city": "", "id": "193", "external_id": "63735", "state": "california", "country": "usa", "capacity_mwh": "46", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Silverstrand Grid, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.205195", "long": "-119.058256", "coords_hint": "3", "use_case": "", "notes": "Using 3.1MWh to get from the packs to capacity", "project_website": "", "link1": "https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/", "link2": "", "link3": "", "link4": ""}, "internal_id": "193", "external_id": "63735", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Silverstrand Grid Energy Storage System", "external_id": "63735", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 22, "power_mw": 11, "owner": "Silverstrand Grid, LLC", "status": "operation", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"SLV01": {"first": {"year": "2021", "month": "3", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "plant producer type": "IPP", "plant name": "Silverstrand Grid Energy Storage System", "plant state": "CA", "plant id": "63735", "generator id": "SLV01", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "63735", "date": "2021-03", "mw": 11}, "first_month": "2020-09", "changes": [{"month": "2021-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2021-04", "li": [{"name": "date", "from": "2021-03", "to": "2021-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2021-06", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}]}], "current": {"year": "2021", "month": "4", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "plant producer type": "IPP", "plant name": "Silverstrand Grid Energy Storage System", "plant state": "CA", "plant id": "63735", "generator id": "SLV01", "net summer capacity (mw)": "11", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "63735", "date": "2021-04", "mw": 11}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "month_disappeared": ""}}, "mw": 11, "mwh_is_estimate": false, "mwh": 46, "mwh_estimate": 22, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2021-01", "start_operation": "2021-04", "start_estimated": "", "month_disappeared": "", "go_live": "2021-04", "go_live_year_int": 2021, "name": "Silverstrand Grid Energy Storage System", "name_short": "Silverstrand Grid", "owner": "Silverstrand Grid, LLC", "state": "california", "country": "usa", "lat": "34.205195", "long": "-119.058256", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.205195+-119.058256", "construction_time_month": 3, "construction_speed_mwh_per_month": 15, "no_of_battery_units": 15, "notes_split": ["Using 3.1MWh to get from the packs to capacity"], "links": ["https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Vallecito Energy Storage Resilience (VESR)", "city": "carpinteria / santa barbara county", "id": "11", "external_id": "62801", "state": "california", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Clean Coalition", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "2020-11-05", "start_operation": "2021-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.408083", "long": "-119.512937", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "link2": "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/", "link3": "", "link4": ""}, "internal_id": "11", "external_id": "62801", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vallecito", "external_id": "62801", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 20, "power_mw": 10, "owner": "Viridity Energy Solutions, Inc.", "status": "operation", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "2021-02", "start_estimated": "", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"ORN34": {"first": {"year": "2020", "month": "12", "entity id": "61522", "entity name": "Viridity Energy Solutions, Inc.", "plant producer type": "IPP", "plant name": "Vallecito", "plant state": "CA", "plant id": "62801", "generator id": "ORN34", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "62801", "date": "2020-12", "mw": 10}, "first_month": "2020-09", "changes": [{"month": "2021-02", "li": [{"name": "date", "from": "2020-12", "to": "2021-03", "extra": "delayed by 3 months", "change_type": "timing"}]}, {"month": "2021-04", "li": [{"name": "status", "from": "construction", "to": "operation", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "change_type": "status"}, {"name": "status_verbose", "from": "(V) Under construction, more than 50 percent complete", "to": "operation", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2021-03", "to": "2021-02", "extra": "accelerated by 1 month", "change_type": "timing"}]}], "current": {"year": "2021", "month": "2", "entity id": "61522", "entity name": "Viridity Energy Solutions, Inc.", "plant producer type": "IPP", "plant name": "Vallecito", "plant state": "CA", "plant id": "62801", "generator id": "ORN34", "net summer capacity (mw)": "10", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "ext_id": "62801", "date": "2021-02", "mw": 10}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 10, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 20, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2020-09", "start_construction": "2020-11-05", "start_operation": "2021-02", "start_estimated": "", "month_disappeared": "", "go_live": "2021-02", "go_live_year_int": 2021, "name": "Vallecito", "name_short": "Vallecito", "owner": "Viridity Energy Solutions, Inc.", "state": "california", "country": "usa", "lat": "34.408083", "long": "-119.512937", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.408083+-119.512937", "construction_time_month": 3, "construction_speed_mwh_per_month": 13, "no_of_battery_units": 15, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "WindCharger", "city": "", "id": "16", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "10", "customer": "TransAlta", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "9", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "49.582737", "long": "-113.794235", "coords_hint": "1", "use_case": "wind farm support", "notes": "", "project_website": "", "link1": "https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "link2": "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "link3": "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf", "link4": ""}, "internal_id": "16", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "month_disappeared": "", "go_live": "2020-10", "go_live_year_int": 2020, "name": "WindCharger", "name_short": "WindCharger", "owner": "", "state": "alberta", "country": "canada", "lat": "49.582737", "long": "-113.794235", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:49.582737+-113.794235", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 9, "notes_split": [""], "links": ["https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "ngen slovenia 2", "city": "Kidrievo", "id": "21", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "15", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "12", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.391223", "long": "15.78985", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/", "link2": "", "link3": "", "link4": ""}, "internal_id": "21", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 15, "mwh_is_estimate": false, "mwh": 30, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "month_disappeared": "", "go_live": "2020-10", "go_live_year_int": 2020, "name": "ngen slovenia 2", "name_short": "ngen slovenia 2", "owner": "", "state": "", "country": "slovenia", "lat": "46.391223", "long": "15.78985", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.391223+15.78985", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 12, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Holes Bay", "city": "Poole", "id": "17", "external_id": "", "state": "dorset", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "7.5", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures BV ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "link2": "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "link3": "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "link4": "https://frv.com/en/projects/holes-bay/"}, "internal_id": "17", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 7, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "month_disappeared": "", "go_live": "2020-09", "go_live_year_int": 2020, "name": "Holes Bay", "name_short": "Holes Bay", "owner": "", "state": "dorset", "country": "uk", "lat": "50.726395", "long": "-1.9901", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.726395+-1.9901", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 6, "notes_split": [""], "links": ["https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "https://frv.com/en/projects/holes-bay/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Lake Bonney Wind Farm", "city": "", "id": "28", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "25", "customer": "Infigen Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-37.738826", "long": "140.38693", "coords_hint": "1", "use_case": "278MW wind farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "link2": "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/", "link3": "", "link4": ""}, "internal_id": "28", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "month_disappeared": "", "go_live": "2020-01", "go_live_year_int": 2020, "name": "Lake Bonney Wind Farm", "name_short": "Lake Bonney Wind Farm", "owner": "", "state": "south australia", "country": "australia", "lat": "-37.738826", "long": "140.38693", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-37.738826+140.38693", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Nantucket", "city": "Nantucket island", "id": "25", "external_id": "", "state": "massachusetts", "country": "usa", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "6", "customer": "National Grid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.258489", "long": "-70.051666", "coords_hint": "1", "use_case": "island", "notes": "", "project_website": "", "link1": "https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "link2": "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/", "link3": "", "link4": ""}, "internal_id": "25", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 6, "mwh_is_estimate": false, "mwh": 48, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "month_disappeared": "", "go_live": "2019-19", "go_live_year_int": 2019, "name": "Nantucket", "name_short": "Nantucket", "owner": "", "state": "massachusetts", "country": "usa", "lat": "41.258489", "long": "-70.051666", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.258489+-70.051666", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "ngen slovenia 1", "city": "Jesenice", "id": "22", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "12", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.418237", "long": "14.10062", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.youtube.com/watch?v=v9j-2lsMcJ0", "link2": "", "link3": "", "link4": ""}, "internal_id": "22", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 12, "mwh_is_estimate": false, "mwh": 22, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "month_disappeared": "", "go_live": "2019-10", "go_live_year_int": 2019, "name": "ngen slovenia 1", "name_short": "ngen slovenia 1", "owner": "", "state": "", "country": "slovenia", "lat": "46.418237", "long": "14.10062", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:46.418237+14.10062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.youtube.com/watch?v=v9j-2lsMcJ0"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Guildford electric buses", "city": "guildford", "id": "26", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "", "customer": "Zenobe Energy ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.205099", "long": "-0.581772", "coords_hint": "1", "use_case": "bus depot", "notes": "it is a stagecoach bus depot", "project_website": "", "link1": "https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "link2": "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/", "link3": "", "link4": ""}, "internal_id": "26", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 15, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "month_disappeared": "", "go_live": "2019-06", "go_live_year_int": 2019, "name": "Guildford electric buses", "name_short": "Guildford electric buses", "owner": "", "state": "", "country": "uk", "lat": "51.205099", "long": "-0.581772", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.205099+-0.581772", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": ["it is a stagecoach bus depot"], "links": ["https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Osaka Trains", "city": "Osaka", "id": "9", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "42", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.701231", "long": "135.494584", "coords_hint": "0", "use_case": "train station backup", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/telsa-powerpack-osaka-japan/", "link2": "", "link3": "", "link4": ""}, "internal_id": "9", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 12, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "month_disappeared": "", "go_live": "2019-03", "go_live_year_int": 2019, "name": "Osaka Trains", "name_short": "Osaka Trains", "owner": "", "state": "", "country": "japan", "lat": "34.701231", "long": "135.494584", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.701231+135.494584", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 42, "notes_split": [""], "links": ["https://www.teslarati.com/telsa-powerpack-osaka-japan/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Colorado ", "city": "Weld County", "id": "24", "external_id": "", "state": "colorado", "country": "usa", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "4", "customer": "United Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.577109", "long": "-104.40854", "coords_hint": "0", "use_case": "", "notes": "could not find exact location though it is operational", "project_website": "", "link1": "https://www.youtube.com/watch?v=dyAhUREGDzA", "link2": "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/", "link3": "", "link4": ""}, "internal_id": "24", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 4, "mwh_is_estimate": false, "mwh": 16, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "month_disappeared": "", "go_live": "2019-01", "go_live_year_int": 2019, "name": "Colorado ", "name_short": "Colorado ", "owner": "", "state": "colorado", "country": "usa", "lat": "40.577109", "long": "-104.40854", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.577109+-104.40854", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["could not find exact location though it is operational"], "links": ["https://www.youtube.com/watch?v=dyAhUREGDzA", "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Gannawarra Solar Farm", "city": "", "id": "27", "external_id": "", "state": "victora", "country": "australia", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "25", "customer": "Edify Energy / Wirsol", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-35.734258", "long": "143.780015", "coords_hint": "1", "use_case": "60MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/", "link2": "", "link3": "", "link4": ""}, "internal_id": "27", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 25, "mwh_is_estimate": false, "mwh": 50, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "month_disappeared": "", "go_live": "2018-11", "go_live_year_int": 2018, "name": "Gannawarra Solar Farm", "name_short": "Gannawarra Solar Farm", "owner": "", "state": "victora", "country": "australia", "lat": "-35.734258", "long": "143.780015", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-35.734258+143.780015", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Samoa", "city": "", "id": "30", "external_id": "", "state": "", "country": "samoa", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-13.885669", "long": "-171.884245", "coords_hint": "1", "use_case": "island", "notes": "2 locations at power station and airport", "project_website": "", "link1": "https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/", "link2": "", "link3": "", "link4": ""}, "internal_id": "30", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 13, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "month_disappeared": "", "go_live": "2018-07", "go_live_year_int": 2018, "name": "Samoa", "name_short": "Samoa", "owner": "", "state": "", "country": "samoa", "lat": "-13.885669", "long": "-171.884245", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-13.885669+-171.884245", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["2 locations at power station and airport"], "links": ["https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Pinal Central Solar Energy Center", "city": "", "id": "31", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Salt River Project", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.868983", "long": "-111.557171", "coords_hint": "1", "use_case": "20MW solar farm support", "notes": "Added 40 mwh as the youtube video said it can power with 10MW for 4 hours", "project_website": "", "link1": "https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "link2": "https://www.youtube.com/watch?v=e9RuVL3t4jQ", "link3": "", "link4": ""}, "internal_id": "31", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 10, "mwh_is_estimate": false, "mwh": 40, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Pinal Central Solar Energy Center", "name_short": "Pinal Central Solar", "owner": "", "state": "arizona", "country": "usa", "lat": "32.868983", "long": "-111.557171", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.868983+-111.557171", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Added 40 mwh as the youtube video said it can power with 10MW for 4 hours"], "links": ["https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "https://www.youtube.com/watch?v=e9RuVL3t4jQ"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Terhills", "city": "Terhills", "id": "32", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "29", "estimate_mwh": "", "power_mw": "18", "customer": "Restore", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.006595", "long": "5.711134", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/", "link2": "", "link3": "", "link4": ""}, "internal_id": "32", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 18, "mwh_is_estimate": false, "mwh": 29, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "month_disappeared": "", "go_live": "2018-05", "go_live_year_int": 2018, "name": "Terhills", "name_short": "Terhills", "owner": "", "state": "", "country": "belgium", "lat": "51.006595", "long": "5.711134", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.006595+5.711134", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hornsdale Power Reserve", "city": "hornsdale", "id": "8", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "194", "estimate_mwh": "", "power_mw": "150", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.085797", "long": "138.518339", "coords_hint": "1", "use_case": "316MW wind farm support", "notes": "42 power packs", "project_website": "https://hornsdalepowerreserve.com.au/", "link1": "https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve", "link2": "", "link3": "", "link4": ""}, "internal_id": "8", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 150, "mwh_is_estimate": false, "mwh": 194, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-12", "go_live_year_int": 2017, "name": "Hornsdale Power Reserve", "name_short": "Hornsdale Power Reserve", "owner": "", "state": "south australia", "country": "australia", "lat": "-33.085797", "long": "138.518339", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.085797+138.518339", "construction_time_month": 4, "construction_speed_mwh_per_month": 48, "no_of_battery_units": 0, "notes_split": ["42 power packs"], "links": ["https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Mira Loma Substation", "city": "Ontario", "id": "20", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "SCE Southern California Edison", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.00548", "long": "-117.566749", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity", "link2": "", "link3": "", "link4": ""}, "internal_id": "20", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 20, "mwh_is_estimate": false, "mwh": 80, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "month_disappeared": "", "go_live": "2017-06", "go_live_year_int": 2017, "name": "Mira Loma Substation", "name_short": "Mira Loma Substation", "owner": "", "state": "california", "country": "usa", "lat": "34.00548", "long": "-117.566749", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.00548+-117.566749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Kauai Island", "city": "Kauai", "id": "19", "external_id": "", "state": "hawaii", "country": "usa", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "", "customer": "KIUC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.998353", "long": "-159.378905", "coords_hint": "1", "use_case": "island, 13mw solar farm support", "notes": "20 year contract to buy energy", "project_website": "", "link1": "https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "link2": "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "link3": "https://en.wikipedia.org/wiki/Kauai", "link4": ""}, "internal_id": "19", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 52, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "month_disappeared": "", "go_live": "2017-03", "go_live_year_int": 2017, "name": "Kauai Island", "name_short": "Kauai Island", "owner": "", "state": "hawaii", "country": "usa", "lat": "21.998353", "long": "-159.378905", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:21.998353+-159.378905", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": ["20 year contract to buy energy"], "links": ["https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "https://en.wikipedia.org/wiki/Kauai"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Trents Energy Storage", "city": "St. Lucy", "id": "36", "external_id": "", "state": "", "country": "barbados", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "5", "customer": "Barbados Light & Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "13.293125", "long": "-59.627449", "coords_hint": "1", "use_case": "island, solar farm support", "notes": "", "project_website": "", "link1": "https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "link2": "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/", "link3": "", "link4": ""}, "internal_id": "36", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 5, "mwh_is_estimate": false, "mwh": 20, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "month_disappeared": "", "go_live": "2017-01", "go_live_year_int": 2017, "name": "Trents Energy Storage", "name_short": "Trents", "owner": "", "state": "", "country": "barbados", "lat": "13.293125", "long": "-59.627449", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:13.293125+-59.627449", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Ta'u island", "city": "Ta'u island", "id": "29", "external_id": "", "state": "american samoa", "country": "usa", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-14.219534", "long": "-169.494626", "coords_hint": "1", "use_case": "island, 1.4MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/", "link2": "", "link3": "", "link4": ""}, "internal_id": "29", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 6, "mwh_estimate": 0, "status": "operation", "status_class": "badge rounded-pill bg-success", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "month_disappeared": "", "go_live": "2016-11", "go_live_year_int": 2016, "name": "Ta'u island", "name_short": "Ta'u island", "owner": "", "state": "american samoa", "country": "usa", "lat": "-14.219534", "long": "-169.494626", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-14.219534+-169.494626", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 272, "notes_split": [""], "links": ["https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/"], "in_operation": true, "in_construction": false, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Hornsea Project Three - Battery Storage", "city": "", "id": "1379", "external_id": "9754", "state": "eastern", "country": "uk", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "Orsted Power (UK) Limited", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1800920444276543858", "link2": "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511", "link3": "", "link4": ""}, "internal_id": "1379", "external_id": "9754", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Hornsea Project Three - Battery Storage", "external_id": "9754", "state": "eastern", "country": "uk", "mwh": 0, "estimate_mwh": 200, "power_mw": 200, "owner": "Orsted Power (UK) Limited", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "52.575424", "long": "1.247254", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9754", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "Orsted Power (UK) Limited", "Site Name": "Hornsea Project Three - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Main Road, Swardeston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR4 6US", "X-coordinate": "620129", "Y-coordinate": "302465", "Planning Authority": "South Norfolk District Council", "Planning Application Reference": "2022/0867", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.575424", "long": "1.247254", "status": "planning", "mw": 200, "ext_id": "9754"}, "first_month": "2024-01", "changes": [], "current": {"Old Ref ID": "", "Ref ID": "9754", "Record Last Updated (dd/mm/yyyy)": "23/01/2023", "Operator (or Applicant)": "Orsted Power (UK) Limited", "Site Name": "Hornsea Project Three - Battery Storage", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "200", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "E/O Main Road, Swardeston ", "County": "Norfolk", "Region": "Eastern", "Country": "England", "Post Code": "NR4 6US", "X-coordinate": "620129", "Y-coordinate": "302465", "Planning Authority": "South Norfolk District Council", "Planning Application Reference": "2022/0867", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/04/2022", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "23/01/2023", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "23/01/2026", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "52.575424", "long": "1.247254", "status": "planning", "mw": 200, "ext_id": "9754"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01-23", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 200, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 200, "status": "planning", "status_class": "", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "month_disappeared": "", "go_live": "0 ~ 2026Q4", "go_live_year_int": 2026, "name": "Hornsea Project Three - Battery Storage", "name_short": "Hornsea Project Three", "owner": "Orsted Power (UK) Limited", "state": "eastern", "country": "uk", "lat": "52.575424", "long": "1.247254", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:52.575424+1.247254", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://x.com/Tesla_Megapack/status/1800920444276543858", "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Glenbrook", "city": "glenbrook", "id": "1397", "external_id": "", "state": "", "country": "new zealand", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Contact Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "cost_million": "163", "cost_currency": "NZD", "cost_incl_solar": "0", "lat": "-37.203762", "long": "174.734204", "coords_hint": "2", "use_case": "", "notes": "location from the steal site and substation", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1807635731197702615", "link2": "https://www.nzherald.co.nz/business/glenbrook-to-get-big-grid-scale-battery-as-contact-teams-up-with-tesla/5KULSHHUVFEWFBSXYU3G42ONEE/", "link3": "https://www.pv-magazine-australia.com/2024/07/10/contact-teams-with-tesla-on-200-mwh-battery-for-nz/", "link4": ""}, "internal_id": "1397", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "month_disappeared": "", "go_live": "0 ~ 2026Q1", "go_live_year_int": 2026, "name": "Glenbrook", "name_short": "Glenbrook", "owner": "Contact Energy", "state": "", "country": "new zealand", "lat": "-37.203762", "long": "174.734204", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-37.203762+174.734204", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from the steal site and substation"], "links": ["https://x.com/SawyerMerritt/status/1807635731197702615", "https://www.nzherald.co.nz/business/glenbrook-to-get-big-grid-scale-battery-as-contact-teams-up-with-tesla/5KULSHHUVFEWFBSXYU3G42ONEE/", "https://www.pv-magazine-australia.com/2024/07/10/contact-teams-with-tesla-on-200-mwh-battery-for-nz/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Orana BESS", "city": "wellington", "id": "1395", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1660", "estimate_mwh": "", "power_mw": "415", "customer": "EnergyAustralia", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "650", "cost_currency": "AUD", "cost_incl_solar": "0", "lat": "-32.527608", "long": "148.958942", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1812687836887281794", "link2": "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million", "link3": "", "link4": ""}, "internal_id": "1395", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 415, "mwh_is_estimate": false, "mwh": 1660, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "month_disappeared": "", "go_live": "0 ~ 2026", "go_live_year_int": 2026, "name": "Orana BESS", "name_short": "Orana", "owner": "Akaysha Energy", "state": "new south wales", "country": "australia", "lat": "-32.527608", "long": "148.958942", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-32.527608+148.958942", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://x.com/SawyerMerritt/status/1812687836887281794", "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Collie Battery Stage 2", "city": "", "id": "1394", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "1363", "estimate_mwh": "", "power_mw": "341", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31", "long": "116.29", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://colliebattery.com.au/2024/05/01/construction-stage2/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1394", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 341, "mwh_is_estimate": false, "mwh": 1363, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "month_disappeared": "", "go_live": "0 ~ 2025Q4", "go_live_year_int": 2025, "name": "Collie Battery Stage 2", "name_short": "Collie Battery Stage 2", "owner": "neoen", "state": "western australia", "country": "australia", "lat": "-33.31", "long": "116.29", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.31+116.29", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 224, "notes_split": [""], "links": ["https://colliebattery.com.au/2024/05/01/construction-stage2/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Limondale", "city": "balranald", "id": "1396", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "RWE", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.774873", "long": "143.526866", "coords_hint": "2", "use_case": "", "notes": "location from the balrnald supstation on google maps", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1795348622864945179", "link2": "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/", "link3": "", "link4": ""}, "internal_id": "1396", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 400, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "month_disappeared": "", "go_live": "0 ~ 2025Q4", "go_live_year_int": 2025, "name": "Limondale", "name_short": "Limondale", "owner": "RWE", "state": "new south wales", "country": "australia", "lat": "-34.774873", "long": "143.526866", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-34.774873+143.526866", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from the balrnald supstation on google maps"], "links": ["https://x.com/SawyerMerritt/status/1795348622864945179", "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Western Downs Battery", "city": "South West Queensland", "id": "850", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "270", "customer": "Neoen Australia", "owner": "Neoen", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-26.976142", "long": "150.666771", "coords_hint": "2", "use_case": "solar farm support", "notes": "", "project_website": "https://westerndownsgreenpowerhub.com.au/", "link1": "https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "link2": "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/", "link3": "", "link4": ""}, "internal_id": "850", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 270, "mwh_is_estimate": false, "mwh": 540, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "month_disappeared": "", "go_live": "0 ~ 2025Q1", "go_live_year_int": 2025, "name": "Western Downs Battery", "name_short": "Western Downs Battery", "owner": "Neoen", "state": "queensland", "country": "australia", "lat": "-26.976142", "long": "150.666771", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-26.976142+150.666771", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Cross Town", "city": "Gorham", "id": "114", "external_id": "66606", "state": "maine", "country": "usa", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "175", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.68383", "long": "-70.39786", "coords_hint": "1", "use_case": "", "notes": "pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ** got the info about tesla from twitter thread as all plus power project seem to be tesla", "project_website": "https://www.crosstownenergystorage.com/about", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "114", "external_id": "66606", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cross Town Energy Storage", "external_id": "66606", "state": "maine", "country": "usa", "mwh": 0, "estimate_mwh": 350, "power_mw": 175, "owner": "Cross Town Energy Storage LLC", "status": "construction", "date_first_heard": "2023-05", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"CROS1": {"first": {"year": "2025", "month": "3", "entity id": "65639", "entity name": "Cross Town Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cross Town Energy Storage", "plant state": "ME", "plant id": "66606", "generator id": "CROS1", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66606", "date": "2025-03", "mw": 175}, "first_month": "2023-05", "changes": [{"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-03", "to": "2025-08", "extra": "delayed by 5 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "8", "entity id": "65639", "entity name": "Cross Town Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cross Town Energy Storage", "plant state": "ME", "plant id": "66606", "generator id": "CROS1", "net summer capacity (mw)": "175", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "66606", "date": "2025-08", "mw": 175}, "current_month": "2024-06", "dates": {"first_heard": "2023-05", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 175, "mwh_is_estimate": false, "mwh": 350, "mwh_estimate": 350, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-05", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-08", "month_disappeared": "", "go_live": "0 ~ 2025-08", "go_live_year_int": 2025, "name": "Cross Town Energy Storage", "name_short": "Cross Town", "owner": "Cross Town Energy Storage LLC", "state": "maine", "country": "usa", "lat": "43.68383", "long": "-70.39786", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:43.68383+-70.39786", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ", " got the info about tesla from twitter thread as all plus power project seem to be tesla"], "links": ["https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Brendale BESS", "city": "brisbane", "id": "1392", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "410", "estimate_mwh": "", "power_mw": "205", "customer": "", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.329132", "long": "152.973193", "coords_hint": "1", "use_case": "", "notes": "got the location from the picture and in the energy storage article it says it is hosted on unitywater site", "project_website": "https://akayshaenergy.com/projects/brendale-bess", "link1": "https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1392", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 205, "mwh_is_estimate": false, "mwh": 410, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "month_disappeared": "", "go_live": "0 ~ 2025-07", "go_live_year_int": 2025, "name": "Brendale BESS", "name_short": "Brendale", "owner": "Akaysha Energy", "state": "queensland", "country": "australia", "lat": "-27.329132", "long": "152.973193", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.329132+152.973193", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the location from the picture and in the energy storage article it says it is hosted on unitywater site"], "links": ["https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Swanbank", "city": "Ipswich", "id": "1321", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "", "developer": "Clean Co", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "cost_million": "330", "cost_currency": "USD", "cost_incl_solar": "", "lat": "-27.649131", "long": "152.814807", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1759460910530265090", "link2": "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/", "link3": "", "link4": ""}, "internal_id": "1321", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 500, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "month_disappeared": "", "go_live": "0 ~ 2025-06", "go_live_year_int": 2025, "name": "Swanbank", "name_short": "Swanbank", "owner": "", "state": "queensland", "country": "australia", "lat": "-27.649131", "long": "152.814807", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.649131+152.814807", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1759460910530265090", "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Cranberry Point", "city": "Carver", "id": "113", "external_id": "62844", "state": "massachusetts", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.896693", "long": "-70.786639", "coords_hint": "1", "use_case": "", "notes": "got the info about tesla as manufacturer from twitter thread and FAQ on the project website", "project_website": "https://cranberrypointenergystorage.com/", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "113", "external_id": "62844", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Cranberry Point Energy Storage", "external_id": "62844", "state": "massachusetts", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Cranberry Point Energy Storage LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"NA": {"first": {"year": "2023", "month": "5", "entity id": "62733", "entity name": "Cranberry Point Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cranberry Point Energy Storage", "plant state": "MA", "plant id": "62844", "generator id": "NA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "62844", "date": "2023-05", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2021-03", "li": [{"name": "date", "from": "2023-05", "to": "2024-06", "extra": "delayed by 13 months", "change_type": "timing"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2024-06", "to": "2025-05", "extra": "delayed by 11 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2025", "month": "5", "entity id": "62733", "entity name": "Cranberry Point Energy Storage LLC", "plant producer type": "IPP", "plant name": "Cranberry Point Energy Storage", "plant state": "MA", "plant id": "62844", "generator id": "NA", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "62844", "date": "2025-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 300, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2025-05", "month_disappeared": "", "go_live": "0 ~ 2025-05", "go_live_year_int": 2025, "name": "Cranberry Point Energy Storage", "name_short": "Cranberry Point", "owner": "Cranberry Point Energy Storage LLC", "state": "massachusetts", "country": "usa", "lat": "41.896693", "long": "-70.786639", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:41.896693+-70.786639", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the info about tesla as manufacturer from twitter thread and FAQ on the project website"], "links": ["https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Nighthawk Energy Storage, LLC", "city": "", "id": "774", "external_id": "65889", "state": "california", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "600", "power_mw": "300", "customer": "arevon", "owner": "Nighthawk Energy Storage, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.957486", "long": "-117.038749", "coords_hint": "3", "use_case": "", "notes": "got the coords from arevon website, but probably not the exact location yet", "project_website": "https://arevonenergy.com/location/nighthawk/", "link1": "https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/", "link2": "", "link3": "", "link4": ""}, "internal_id": "774", "external_id": "65889", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Nighthawk Energy Storage, LLC", "external_id": "65889", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 600, "power_mw": 300, "owner": "Nighthawk Energy Storage, LLC", "status": "planning", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS": {"first": {"year": "2024", "month": "6", "entity id": "65088", "entity name": "Nighthawk Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Nighthawk Energy Storage, LLC", "plant state": "CA", "plant id": "65889", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "65889", "date": "2024-06", "mw": 300}, "first_month": "2022-09", "changes": [{"month": "2023-08", "li": [{"name": "date", "from": "2024-06", "to": "2025-02", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2025-02", "to": "2025-04", "extra": "delayed by 2 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "4", "entity id": "65088", "entity name": "Nighthawk Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Nighthawk Energy Storage, LLC", "plant state": "CA", "plant id": "65889", "generator id": "BESS", "net summer capacity (mw)": "300", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65889", "date": "2025-04", "mw": 300}, "current_month": "2024-06", "dates": {"first_heard": "2022-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 300, "mwh_is_estimate": false, "mwh": 1200, "mwh_estimate": 600, "status": "planning", "status_class": "", "date_first_heard": "2022-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Nighthawk Energy Storage, LLC", "name_short": "Nighthawk Energy Storage", "owner": "Nighthawk Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.957486", "long": "-117.038749", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.957486+-117.038749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["got the coords from arevon website, but probably not the exact location yet"], "links": ["https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Scatter Wash BESS", "city": "Phoenix", "id": "1322", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "1020", "estimate_mwh": "", "power_mw": "255", "customer": "", "owner": "", "developer": "Strata Clean Energy", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "500", "cost_currency": "USD", "cost_incl_solar": "", "lat": "33.685402", "long": "-112.125062", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1748500029197726146", "link2": "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/", "link3": "", "link4": ""}, "internal_id": "1322", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 255, "mwh_is_estimate": false, "mwh": 1020, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "month_disappeared": "", "go_live": "0 ~ 2025-04", "go_live_year_int": 2025, "name": "Scatter Wash BESS", "name_short": "Scatter Wash", "owner": "", "state": "arizona", "country": "usa", "lat": "33.685402", "long": "-112.125062", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.685402+-112.125062", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1748500029197726146", "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Eland Solar & Storage Center, Phase 2 Hybrid", "city": "", "id": "164", "external_id": "61169", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "69SV 8me LLC", "developer": "Arevon", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "150", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "35.198008", "long": "-117.994", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1760848348607594844", "link2": "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "link3": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link4": ""}, "internal_id": "164", "external_id": "61169", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eland Solar & Storage Center, Phase 2 Hybrid", "external_id": "61169", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "69SV 8me LLC", "status": "planning", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61169": {"first": {"year": "2023", "month": "7", "entity id": "60798", "entity name": "69SV 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 2 Hybrid", "plant state": "CA", "plant id": "61169", "generator id": "61169", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61169", "date": "2023-07", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-11", "extra": "delayed by 12 months", "change_type": "timing"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-11", "to": "2025-03", "extra": "delayed by 4 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "3", "entity id": "60798", "entity name": "69SV 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 2 Hybrid", "plant state": "CA", "plant id": "61169", "generator id": "61169", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "61169", "date": "2025-03", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": null}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "planning", "status_class": "", "date_first_heard": "2020-09", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "month_disappeared": "", "go_live": "0 ~ 2025-03", "go_live_year_int": 2025, "name": "Eland Solar & Storage Center, Phase 2 Hybrid", "name_short": "Eland Solar & Storage Center, Phase...", "owner": "69SV 8me LLC", "state": "california", "country": "usa", "lat": "35.198008", "long": "-117.994", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.198008+-117.994", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/SawyerMerritt/status/1760848348607594844", "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "https://x.com/Tesla_Megapack/status/1794120454883659833"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Peregrine", "city": "San Diego", "id": "865", "external_id": "66286", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.692183", "long": "-117.13667", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/peregrine/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/", "link2": "", "link3": "", "link4": ""}, "internal_id": "865", "external_id": "66286", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Peregrine Energy Storage LLC", "external_id": "66286", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Peregrine Energy Storage, LLC", "status": "planning", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"PERE1": {"first": {"year": "2024", "month": "8", "entity id": "65398", "entity name": "Peregrine Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Peregrine Energy Storage LLC", "plant state": "CA", "plant id": "66286", "generator id": "PERE1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66286", "date": "2024-08", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2023-10", "li": [{"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(L) Regulatory approvals pending. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "date", "from": "2024-08", "to": "2024-12", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-12", "to": "2024-09", "extra": "accelerated by 3 months", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-09", "to": "2024-10", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-10", "to": "2025-01", "extra": "delayed by 3 months", "change_type": "timing"}]}], "current": {"year": "2025", "month": "1", "entity id": "65398", "entity name": "Peregrine Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Peregrine Energy Storage LLC", "plant state": "CA", "plant id": "66286", "generator id": "PERE1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "66286", "date": "2025-01", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": null}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "planning", "status_class": "", "date_first_heard": "2023-03", "start_construction": "", "start_operation": "", "start_estimated": "2025-01", "month_disappeared": "", "go_live": "0 ~ 2025-01", "go_live_year_int": 2025, "name": "Peregrine Energy Storage LLC", "name_short": "Peregrine Energy Storage", "owner": "Peregrine Energy Storage, LLC", "state": "california", "country": "usa", "lat": "32.692183", "long": "-117.13667", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.692183+-117.13667", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Oneida Energy Storage Project", "city": "Haldimand County", "id": "866", "external_id": "", "state": "ontario", "country": "canada", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "NRStor", "owner": "Northland Power ** SNGRDC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "42.886859", "long": "-80.12224", "coords_hint": "3", "use_case": "", "notes": "The article mentions Jarvis in Haldimand County", "project_website": "https://www.snfuture.com/projects/oneida-energy-storage/", "link1": "https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/", "link2": "", "link3": "", "link4": ""}, "internal_id": "866", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "month_disappeared": "", "go_live": "0 ~ 2025", "go_live_year_int": 2025, "name": "Oneida Energy Storage Project", "name_short": "Oneida", "owner": "Northland Power ** SNGRDC", "state": "ontario", "country": "canada", "lat": "42.886859", "long": "-80.12224", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:42.886859+-80.12224", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["The article mentions Jarvis in Haldimand County"], "links": ["https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Collie Battery Stage 1", "city": "", "id": "1174", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "877", "estimate_mwh": "", "power_mw": "219", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31604", "long": "116.289605", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "link2": "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/", "link3": "", "link4": ""}, "internal_id": "1174", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 219, "mwh_is_estimate": false, "mwh": 877, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "month_disappeared": "", "go_live": "0 ~ 2024Q4", "go_live_year_int": 2024, "name": "Collie Battery Stage 1", "name_short": "Collie Battery Stage 1", "owner": "neoen", "state": "western australia", "country": "australia", "lat": "-33.31604", "long": "116.289605", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-33.31604+116.289605", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 224, "notes_split": [""], "links": ["https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Rye Common", "city": "Farnham", "id": "410", "external_id": "7737", "state": "hampshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.25011", "long": "-0.87423", "coords_hint": "1", "use_case": "", "notes": "Phase II is 200m north-east of Phase I", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "link4": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"}, "internal_id": "410", "external_id": "7737", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rye Common", "external_id": "7737", "state": "south east", "country": "uk", "mwh": 0, "estimate_mwh": 49, "power_mw": 49, "owner": "Pulse Clean Energy", "status": "planning", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "51.248047", "long": "-0.87689", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7737", "Record Last Updated (dd/mm/yyyy)": "06/10/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rye Common", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.50", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Address": "Street Record, Rye Common Lane, Crondall, Farnham, Surrey", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DD", "X-coordinate": "478485", "Y-coordinate": "150474", "Planning Authority": "Hart District Council", "Planning Application Reference": "20/00651/FUL", "Appeal Reference": "PP-08735792", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "01/05/2020", "Appeal Lodged": "22/02/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "28/09/2021", "Planning Permission Granted": "", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.248047", "long": "-0.87689", "status": "planning", "mw": 49, "ext_id": "7737"}, "first_month": "2021-09", "changes": [{"month": "2022-04", "li": [{"name": "Address", "from": "Street Record, Rye Common Lane, Crondall, Farnham, Surrey", "to": "Street Record, Rye Common Lane, Crondall, Farnham, ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Granted", "from": "", "to": "28/09/2021", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Expired", "from": "", "to": "28/09/2024", "extra": "", "change_type": "misc"}]}, {"month": "2023-07", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "06/10/2021", "to": "", "extra": "", "change_type": "misc"}]}, {"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "", "to": "12/03/2020", "extra": "", "change_type": "misc"}, {"name": "Operator (or Applicant)", "from": "Harmony Energy Storage", "to": "Pulse Clean Energy", "extra": "", "change_type": "misc"}, {"name": "Are they re-applying (Old REPD Ref) ", "from": "", "to": "7028", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7737", "Record Last Updated (dd/mm/yyyy)": "12/03/2020", "Operator (or Applicant)": "Pulse Clean Energy", "Site Name": "Rye Common", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "49.5", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Appeal Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7028", "Address": "Street Record, Rye Common Lane, Crondall, Farnham, ", "County": "Hampshire", "Region": "South East", "Country": "England", "Post Code": "GU10 5DD", "X-coordinate": "478485", "Y-coordinate": "150474", "Planning Authority": "Hart District Council", "Planning Application Reference": "20/00651/FUL", "Appeal Reference": "PP-08735792", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "12/03/2020", "Planning Application Withdrawn": "", "Planning Permission Refused": "01/05/2020", "Appeal Lodged": "22/02/2021", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "28/09/2021", "Planning Permission Granted": "28/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "28/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "51.248047", "long": "-0.87689", "status": "planning", "mw": 49, "ext_id": "7737"}, "current_month": "2024-01", "dates": {"first_heard": "2021-10-06", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 49, "mwh_is_estimate": false, "mwh": 198, "mwh_estimate": 49, "status": "planning", "status_class": "", "date_first_heard": "2021-09-28", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "month_disappeared": "", "go_live": "0 ~ 2024Q3", "go_live_year_int": 2024, "name": "Rye Common", "name_short": "Rye Common", "owner": "Pulse Clean Energy", "state": "south east", "country": "uk", "lat": "51.248047", "long": "-0.87689", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:51.248047+-0.87689", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Phase II is 200m north-east of Phase I"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hawthorn Pit", "city": "Murton", "id": "849", "external_id": "", "state": "county durham", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99.8", "power_mw": "49.9", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.80552", "long": "-1.40646", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, "internal_id": "849", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 49, "mwh_is_estimate": true, "mwh": 99, "mwh_estimate": 99, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "month_disappeared": "", "go_live": "0 ~ 2024Q2", "go_live_year_int": 2024, "name": "Hawthorn Pit", "name_short": "Hawthorn Pit", "owner": "Harmony Energy Income Trust", "state": "county durham", "country": "uk", "lat": "54.80552", "long": "-1.40646", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.80552+-1.40646", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Failed Oct 2022 C share placement puts construction in doubt"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Wormald Green", "city": "Harrogate", "id": "848", "external_id": "", "state": "yorkshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.07548", "long": "-1.52312", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, "internal_id": "848", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 33, "mwh_is_estimate": true, "mwh": 66, "mwh_estimate": 66, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "month_disappeared": "", "go_live": "0 ~ 2024Q1", "go_live_year_int": 2024, "name": "Wormald Green", "name_short": "Wormald Green", "owner": "Harmony Energy Income Trust", "state": "yorkshire", "country": "uk", "lat": "54.07548", "long": "-1.52312", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:54.07548+-1.52312", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Failed Oct 2022 C share placement puts construction in doubt"], "links": ["https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ville-sur-Haine", "city": "", "id": "1393", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Eneco", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.47647", "long": "4.077998", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/", "link2": "", "link3": "", "link4": ""}, "internal_id": "1393", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 50, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "month_disappeared": "", "go_live": "0 ~ 2024-12", "go_live_year_int": 2024, "name": "Ville-sur-Haine", "name_short": "Ville-sur-Haine", "owner": "Eneco", "state": "", "country": "belgium", "lat": "50.47647", "long": "4.077998", "coords_hint": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.47647+4.077998", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Eland Solar", "city": "Kern County", "id": "62", "external_id": "61168", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "8minute / Capital Dynamics / LADWP", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-22", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.198008", "long": "-117.991201", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "location from planning doc ** partially online in 2022, fully in 2023", "project_website": "", "link1": "https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "link2": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link3": "", "link4": ""}, "internal_id": "62", "external_id": "61168", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Eland Solar & Storage Center, Phase 1 Hybrid", "external_id": "61168", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "68SF 8me LLC", "status": "construction", "date_first_heard": "2020-09", "start_construction": "2022-01", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"61168": {"first": {"year": "2022", "month": "11", "entity id": "60797", "entity name": "68SF 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 1 Hybrid", "plant state": "CA", "plant id": "61168", "generator id": "61168", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "61168", "date": "2022-11", "mw": 150}, "first_month": "2020-09", "changes": [{"month": "2022-01", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2022-11", "to": "2023-07", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2022-09", "li": [{"name": "date", "from": "2023-07", "to": "2023-11", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-01", "li": [{"name": "date", "from": "2023-11", "to": "2024-03", "extra": "delayed by 4 months", "change_type": "timing"}]}, {"month": "2023-05", "li": [{"name": "date", "from": "2024-03", "to": "2024-11", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2024-03", "li": [{"name": "date", "from": "2024-11", "to": "2024-09", "extra": "accelerated by 2 months", "change_type": "timing"}]}], "current": {"year": "2024", "month": "9", "entity id": "60797", "entity name": "68SF 8me LLC", "plant producer type": "IPP", "plant name": "Eland Solar & Storage Center, Phase 1 Hybrid", "plant state": "CA", "plant id": "61168", "generator id": "61168", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(U) Under construction, less than or equal to 50 percent complete", "ext_id": "61168", "date": "2024-09", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2020-09", "start_construction": "2022-01"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-09", "start_construction": "2022-01", "start_operation": "", "start_estimated": "2024-09", "month_disappeared": "", "go_live": "0 ~ 2024-09", "go_live_year_int": 2024, "name": "Eland Solar & Storage Center, Phase 1 Hybrid", "name_short": "Eland Solar & Storage Center, Phase...", "owner": "68SF 8me LLC", "state": "california", "country": "usa", "lat": "35.198008", "long": "-117.991201", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:35.198008+-117.991201", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["location from planning doc ", " partially online in 2022, fully in 2023"], "links": ["https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "https://x.com/Tesla_Megapack/status/1794120454883659833"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Sierra Estrella Energy Storage", "city": "", "id": "851", "external_id": "66334", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "276", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.410648", "long": "-112.313765", "coords_hint": "1", "use_case": "", "notes": "got the location from the map on the projects page / nr of megapacks from the pdf", "project_website": "https://www.sierraestrellaenergystorage.com/about", "link1": "https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf", "link2": "", "link3": "", "link4": ""}, "internal_id": "851", "external_id": "66334", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Sierra Estrella Energy Storage", "external_id": "66334", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 500, "power_mw": 250, "owner": "Sierra Estrella Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS3": {"first": {"year": "2024", "month": "6", "entity id": "65418", "entity name": "Sierra Estrella Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Sierra Estrella Energy Storage", "plant state": "AZ", "plant id": "66334", "generator id": "BESS3", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66334", "date": "2024-06", "mw": 250}, "first_month": "2023-03", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-09", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65418", "entity name": "Sierra Estrella Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Sierra Estrella Energy Storage", "plant state": "AZ", "plant id": "66334", "generator id": "BESS3", "net summer capacity (mw)": "250", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66334", "date": "2024-06", "mw": 250}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-09"}, "month_disappeared": ""}}, "mw": 250, "mwh_is_estimate": false, "mwh": 1000, "mwh_estimate": 500, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2023-09", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Sierra Estrella Energy Storage", "name_short": "Sierra Estrella", "owner": "Sierra Estrella Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "33.410648", "long": "-112.313765", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udcca\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.410648+-112.313765", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 276, "notes_split": ["got the location from the map on the projects page / nr of megapacks from the pdf"], "links": ["https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Superstition Energy Storage", "city": "Gilbert", "id": "852", "external_id": "66333", "state": "arizona", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "", "power_mw": "90", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.358927", "long": "-111.831039", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.superstitionenergystorage.com/about", "link1": "https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, "internal_id": "852", "external_id": "66333", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Superstition Energy Storage", "external_id": "66333", "state": "arizona", "country": "usa", "mwh": 0, "estimate_mwh": 180, "power_mw": 90, "owner": "Superstition Energy Storage, LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"BESS4": {"first": {"year": "2024", "month": "6", "entity id": "65419", "entity name": "Superstition Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Superstition Energy Storage", "plant state": "AZ", "plant id": "66333", "generator id": "BESS4", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(P) Planned for installation, but regulatory approvals not initiated", "ext_id": "66333", "date": "2024-06", "mw": 90}, "first_month": "2023-03", "changes": [{"month": "2023-08", "li": [{"name": "status_verbose", "from": "(P) Planned for installation, but regulatory approvals not initiated", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2024-04", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}], "current": {"year": "2024", "month": "6", "entity id": "65419", "entity name": "Superstition Energy Storage, LLC", "plant producer type": "IPP", "plant name": "Superstition Energy Storage", "plant state": "AZ", "plant id": "66333", "generator id": "BESS4", "net summer capacity (mw)": "90", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66333", "date": "2024-06", "mw": 90}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2024-04"}, "month_disappeared": ""}}, "mw": 90, "mwh_is_estimate": false, "mwh": 360, "mwh_estimate": 180, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2024-04", "start_operation": "", "start_estimated": "2024-06", "month_disappeared": "", "go_live": "0 ~ 2024-06", "go_live_year_int": 2024, "name": "Superstition Energy Storage", "name_short": "Superstition", "owner": "Superstition Energy Storage, LLC", "state": "arizona", "country": "usa", "lat": "33.358927", "long": "-111.831039", "coords_hint": 1, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:33.358927+-111.831039", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "https://twitter.com/SharifaDarani/status/1612314447074439168"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Vikings Energy Farm", "city": "", "id": "697", "external_id": "65711", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Vikings Energy Farm, LLC", "developer": "arevon", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.804395", "long": "-115.274713", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/viking/", "link1": "https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "link2": "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/", "link3": "", "link4": ""}, "internal_id": "697", "external_id": "65711", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Vikings Energy Farm", "external_id": "65711", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 300, "power_mw": 150, "owner": "Vikings Energy Farm, LLC", "status": "construction", "date_first_heard": "2022-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"GEN2": {"first": {"year": "2023", "month": "12", "entity id": "64966", "entity name": "Vikings Energy Farm, LLC", "plant producer type": "IPP", "plant name": "Vikings Energy Farm", "plant state": "CA", "plant id": "65711", "generator id": "GEN2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "ext_id": "65711", "date": "2023-12", "mw": 150}, "first_month": "2022-07", "changes": [{"month": "2023-02", "li": [{"name": "status_verbose", "from": "(L) Regulatory approvals pending. Not under construction", "to": "(T) Regulatory approvals received. Not under construction", "extra": "", "change_type": "misc"}]}, {"month": "2023-03", "li": [{"name": "date", "from": "2023-12", "to": "2024-08", "extra": "delayed by 8 months", "change_type": "timing"}]}, {"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-02", "extra": "accelerated by 6 months", "change_type": "timing"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-02", "to": "2024-03", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-04", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "64966", "entity name": "Vikings Energy Farm, LLC", "plant producer type": "IPP", "plant name": "Vikings Energy Farm", "plant state": "CA", "plant id": "65711", "generator id": "GEN2", "net summer capacity (mw)": "150", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "65711", "date": "2024-05", "mw": 150}, "current_month": "2024-06", "dates": {"first_heard": "2022-07", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 150, "mwh_is_estimate": false, "mwh": 600, "mwh_estimate": 300, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2022-07", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Vikings Energy Farm", "name_short": "Vikings Energy Farm", "owner": "Vikings Energy Farm, LLC", "state": "california", "country": "usa", "lat": "32.804395", "long": "-115.274713", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:32.804395+-115.274713", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Condor", "city": "", "id": "864", "external_id": "66285", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.020505", "long": "-117.332255", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/condor/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/", "link2": "", "link3": "", "link4": ""}, "internal_id": "864", "external_id": "66285", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "us_eia", "name": "Condor Energy Storage LLC", "external_id": "66285", "state": "california", "country": "usa", "mwh": 0, "estimate_mwh": 400, "power_mw": 200, "owner": "Condor Energy Storage LLC", "status": "construction", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "lat": "", "long": "", "coords_hint": -1, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"COND1": {"first": {"year": "2024", "month": "8", "entity id": "65397", "entity name": "Condor Energy Storage LLC", "plant producer type": "IPP", "plant name": "Condor Energy Storage LLC", "plant state": "CA", "plant id": "66285", "generator id": "COND1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "planning", "status_verbose": "(T) Regulatory approvals received. Not under construction", "ext_id": "66285", "date": "2024-08", "mw": 200}, "first_month": "2023-03", "changes": [{"month": "2023-10", "li": [{"name": "status", "from": "planning", "to": "construction", "extra": "\ud83c\udfd7\ufe0f", "change_type": "status"}, {"name": "status_verbose", "from": "(T) Regulatory approvals received. Not under construction", "to": "(U) Under construction, less than or equal to 50 percent complete", "extra": "", "change_type": "misc"}, {"name": "date", "from": "2024-08", "to": "2024-03", "extra": "accelerated by 5 months", "change_type": "timing"}]}, {"month": "2023-12", "li": [{"name": "status_verbose", "from": "(U) Under construction, less than or equal to 50 percent complete", "to": "(V) Under construction, more than 50 percent complete", "extra": "", "change_type": "misc"}]}, {"month": "2024-02", "li": [{"name": "date", "from": "2024-03", "to": "2024-04", "extra": "delayed by 1 month", "change_type": "timing"}]}, {"month": "2024-06", "li": [{"name": "date", "from": "2024-04", "to": "2024-05", "extra": "delayed by 1 month", "change_type": "timing"}]}], "current": {"year": "2024", "month": "5", "entity id": "65397", "entity name": "Condor Energy Storage LLC", "plant producer type": "IPP", "plant name": "Condor Energy Storage LLC", "plant state": "CA", "plant id": "66285", "generator id": "COND1", "net summer capacity (mw)": "200", "technology": "Batteries", "energy source code": "MWH", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "ext_id": "66285", "date": "2024-05", "mw": 200}, "current_month": "2024-06", "dates": {"first_heard": "2023-03", "start_construction": "2023-10"}, "month_disappeared": ""}}, "mw": 200, "mwh_is_estimate": false, "mwh": 800, "mwh_estimate": 400, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2023-03", "start_construction": "2023-10", "start_operation": "", "start_estimated": "2024-05", "month_disappeared": "", "go_live": "0 ~ 2024-05", "go_live_year_int": 2024, "name": "Condor Energy Storage LLC", "name_short": "Condor Energy Storage", "owner": "Condor Energy Storage LLC", "state": "california", "country": "usa", "lat": "34.020505", "long": "-117.332255", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:34.020505+-117.332255", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Rusholme Grange Resubmission", "city": "Selby", "id": "489", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "70", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.73122", "long": "-0.94159", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00", "link3": "", "link4": ""}, "internal_id": "489", "external_id": "9121", "has_user_data": true, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Rusholme Grange ", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "mwh": 0, "estimate_mwh": 40, "power_mw": 40, "owner": "Harmony Energy Storage", "status": "planning", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "9121", "Record Last Updated (dd/mm/yyyy)": "07/06/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rusholme Grange Resubmission", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40.00", "CHP Enabled": "No", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Application Submitted", "Development Status (short)": "Application Submitted", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/0601/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "19/12/2017", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 40, "ext_id": "9121"}, "first_month": "2021-09", "changes": [{"month": "2021-12", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "07/06/2021", "to": "13/12/2021", "extra": "", "change_type": "misc"}, {"name": "Development Status", "from": "Planning Application Submitted", "to": "Planning Permission Granted", "extra": "", "change_type": "misc"}, {"name": "Development Status (short)", "from": "Application Submitted", "to": "Awaiting Construction", "extra": "", "change_type": "misc"}, {"name": "Address", "from": "Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire", "to": "Rusholme Grange, Rusholme Lane, Drax, Selby", "extra": "", "change_type": "misc"}, {"name": "Planning Permission Granted", "from": "19/12/2017", "to": "03/09/2021", "extra": "", "change_type": "misc"}]}, {"month": "2022-04", "li": [{"name": "Site Name", "from": "Rusholme Grange Resubmission", "to": "Rusholme Grange ", "extra": "", "change_type": "misc"}]}, {"month": "2022-10", "li": [{"name": "Planning Permission Expired", "from": "", "to": "03/09/2024", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "9121", "Record Last Updated (dd/mm/yyyy)": "13/12/2021", "Operator (or Applicant)": "Harmony Energy Storage", "Site Name": "Rusholme Grange ", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "40", "Share Community Scheme": "", "CHP Enabled": "No", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Planning Permission Granted", "Development Status (short)": "Awaiting Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "7093", "Address": "Rusholme Grange, Rusholme Lane, Drax, Selby", "County": "North Yorkshire", "Region": "Yorkshire and Humber", "Country": "England", "Post Code": "YO8 8PW", "X-coordinate": "470197", "Y-coordinate": "426610", "Planning Authority": "Selby District Council", "Planning Application Reference": "2021/0601/FUL", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "26/05/2021", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "03/09/2021", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "03/09/2024", "Under Construction": "", "Operational": "", "Heat Network Ref": "", "lat": "53.73117", "long": "-0.937436", "status": "planning", "mw": 40, "ext_id": "9121"}, "current_month": "2024-01", "dates": {"first_heard": "2021-06-07", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 40, "mwh_is_estimate": false, "mwh": 70, "mwh_estimate": 40, "status": "planning", "status_class": "", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "month_disappeared": "", "go_live": "0 ~ 2023Q3", "go_live_year_int": 2023, "name": "Rusholme Grange ", "name_short": "Rusholme Grange ", "owner": "Harmony Energy Storage", "state": "yorkshire and humber", "country": "uk", "lat": "53.73117", "long": "-0.937436", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:53.73117+-0.937436", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Nofar Israel", "city": "", "id": "5", "external_id": "", "state": "", "country": "israel", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "Nofar Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.961747", "long": "34.835081", "coords_hint": "0", "use_case": "150mw solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy", "link2": "", "link3": "", "link4": ""}, "internal_id": "5", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 100, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Nofar Israel", "name_short": "Nofar Israel", "owner": "", "state": "", "country": "israel", "lat": "31.961747", "long": "34.835081", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:31.961747+34.835081", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Hokkaido", "city": "", "id": "10", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.325369", "long": "142.589328", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market", "link2": "", "link3": "", "link4": ""}, "internal_id": "10", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 6, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Hokkaido", "name_short": "Hokkaido", "owner": "", "state": "", "country": "japan", "lat": "43.325369", "long": "142.589328", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:43.325369+142.589328", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "switch datacenter", "city": "", "id": "18", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "", "customer": "switch", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.058908", "long": "-115.21174", "coords_hint": "0", "use_case": "datacenter", "notes": "", "project_website": "", "link1": "https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/", "link2": "", "link3": "", "link4": ""}, "internal_id": "18", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 0, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "switch datacenter", "name_short": "switch datacenter", "owner": "", "state": "nevada", "country": "usa", "lat": "36.058908", "long": "-115.21174", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:36.058908+-115.21174", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Ozop New York", "city": "new york city / brooklyn", "id": "33", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "2", "customer": "Ozop Energy Systems", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.645624", "long": "-73.940749", "coords_hint": "0", "use_case": "peak shaving", "notes": "together with stem athena software", "project_website": "", "link1": "https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "link2": "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html", "link3": "", "link4": ""}, "internal_id": "33", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 2, "mwh_is_estimate": false, "mwh": 4, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Ozop New York", "name_short": "Ozop New York", "owner": "", "state": "new york", "country": "usa", "lat": "40.645624", "long": "-73.940749", "coords_hint": 0, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords not known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:40.645624+-73.940749", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["together with stem athena software"], "links": ["https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": false}, {"csv": {"name": "Holes Bay", "city": "Poole", "id": "404", "external_id": "7688", "state": "dorset", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 17", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, "internal_id": "404", "external_id": "7688", "has_user_data": false, "has_gov_data": true, "gov": {"data_source": "uk_repd", "name": "Holes Bay", "external_id": "7688", "state": "south west", "country": "uk", "mwh": 0, "estimate_mwh": 15, "power_mw": 15, "owner": "Harmony Energy", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "lat": "50.726324", "long": "-1.990215", "coords_hint": 2, "has_multiple_projects": false, "pr_url": ""}, "gov_history": {"first": {"Old Ref ID": "", "Ref ID": "7688", "Record Last Updated (dd/mm/yyyy)": "29/04/2020", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Holes Bay", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15.00", "CHP Enabled": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Address": "Land at Sterte Avenue West, Poole", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH15 2AL", "X-coordinate": "400787", "Y-coordinate": "91856", "Planning Authority": "Poole Borough Council", "Planning Application Reference": "APP/17/00186/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/02/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/01/2023", "Under Construction": "01/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "50.726324", "long": "-1.990215", "status": "construction", "mw": 15, "ext_id": "7688"}, "first_month": "2021-09", "changes": [{"month": "2024-01", "li": [{"name": "Record Last Updated (dd/mm/yyyy)", "from": "29/04/2020", "to": "14/01/2020", "extra": "", "change_type": "misc"}]}], "current": {"Old Ref ID": "", "Ref ID": "7688", "Record Last Updated (dd/mm/yyyy)": "14/01/2020", "Operator (or Applicant)": "Harmony Energy", "Site Name": "Holes Bay", "Technology Type": "Battery", "Storage Type": "Stand-alone Storage", "Storage Co-location REPD Ref ID": "", "Installed Capacity (MWelec)": "15", "Share Community Scheme": "", "CHP Enabled": "", "CfD Allocation Round": "", "RO Banding (ROC/MWh)": "", "FiT Tariff (p/kWh)": "", "CfD Capacity (MW)": "", "Turbine Capacity (MW)": "", "No. of Turbines": "", "Height of Turbines (m)": "", "Mounting Type for Solar": "", "Development Status": "Under Construction", "Development Status (short)": "Under Construction", "Are they re-applying (New REPD Ref)": "", "Are they re-applying (Old REPD Ref) ": "", "Address": "Land at Sterte Avenue West, Poole", "County": "Dorset", "Region": "South West", "Country": "England", "Post Code": "BH15 2AL", "X-coordinate": "400787", "Y-coordinate": "91856", "Planning Authority": "Poole Borough Council", "Planning Application Reference": "APP/17/00186/F", "Appeal Reference": "", "Secretary of State Reference": "", "Type of Secretary of State Intervention": "", "Judicial Review": "", "Offshore Wind Round": "", "Planning Application Submitted": "08/02/2017", "Planning Application Withdrawn": "", "Planning Permission Refused": "", "Appeal Lodged": "", "Appeal Withdrawn": "", "Appeal Refused": "", "Appeal Granted": "", "Planning Permission Granted": "14/01/2020", "Secretary of State - Intervened": "", "Secretary of State - Refusal": "", "Secretary of State - Granted": "", "Planning Permission Expired": "14/01/2023", "Under Construction": "01/01/2020", "Operational": "", "Heat Network Ref": "", "lat": "50.726324", "long": "-1.990215", "status": "construction", "mw": 15, "ext_id": "7688"}, "current_month": "2024-01", "dates": {"first_heard": "2020-04-29", "start_construction": "", "start_operation": ""}, "month_disappeared": ""}, "mw": 15, "mwh_is_estimate": true, "mwh": 15, "mwh_estimate": 15, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Holes Bay", "name_short": "Holes Bay", "owner": "Harmony Energy", "state": "south west", "country": "uk", "lat": "50.726324", "long": "-1.990215", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\ud83d\udcca\ud83d\udccf", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:50.726324+-1.990215", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["Duplicate of 17"], "links": [], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Chingjia Energy", "city": "", "id": "1175", "external_id": "", "state": "", "country": "taiwan", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Chingjia Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.222065", "long": "120.945036", "coords_hint": "-2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1693770142554189983", "link2": "", "link3": "", "link4": ""}, "internal_id": "1175", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 0, "mwh_is_estimate": false, "mwh": 200, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Chingjia Energy", "name_short": "Chingjia", "owner": "Chingjia Energy", "state": "", "country": "taiwan", "lat": "24.222065", "long": "120.945036", "coords_hint": -2, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the country is known", "emojis": "\ud83d\udccd\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udccd\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:24.222065+120.945036", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": [""], "links": ["https://twitter.com/Tesla_Megapack/status/1693770142554189983"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Supernode Stage 1", "city": "brisbane", "id": "1390", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "520", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.318405", "long": "152.969631", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "link2": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link3": "https://x.com/FredericLambert/status/1811399467070894094", "link4": ""}, "internal_id": "1390", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 520, "mwh_estimate": 0, "status": "construction", "status_class": "badge rounded-pill bg-secondary", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Supernode Stage 1", "name_short": "Supernode Stage 1", "owner": "Quinbrook", "state": "queensland", "country": "australia", "lat": "-27.318405", "long": "152.969631", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\ud83d\udc64", "emojis_with_tooltips": "\ud83d\udc64", "heart_tooltip": "", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.318405+152.969631", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer"], "links": ["https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "https://x.com/FredericLambert/status/1811399467070894094"], "in_operation": false, "in_construction": true, "in_planning": false, "is_active": true, "is_tesla": true, "is_megapack": true}, {"csv": {"name": "Supernode Stage 2", "city": "brisbane", "id": "1391", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "1040", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.320103", "long": "152.970537", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link2": "https://x.com/FredericLambert/status/1811399467070894094", "link3": "", "link4": ""}, "internal_id": "1391", "external_id": "", "has_user_data": true, "has_gov_data": false, "gov": {}, "gov_history": null, "mw": 250, "mwh_is_estimate": false, "mwh": 1040, "mwh_estimate": 0, "status": "planning", "status_class": "", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "month_disappeared": "", "go_live": "", "go_live_year_int": null, "name": "Supernode Stage 2", "name_short": "Supernode Stage 2", "owner": "Quinbrook", "state": "queensland", "country": "australia", "lat": "-27.320103", "long": "152.970537", "coords_hint": 2, "coords_exact": true, "coords_help_str": "\u2705 The site is known, coords are +/- 1 kilometer", "emojis": "\u2764\ufe0f\ud83d\udc64", "emojis_with_tooltips": "\u2764\ufe0f\ud83d\udc64", "heart_tooltip": "\u2764\ufe0f", "google_maps_link": "http://maps.google.com/maps?z=19&t=k&q=loc:-27.320103+152.970537", "construction_time_month": null, "construction_speed_mwh_per_month": null, "no_of_battery_units": 0, "notes_split": ["todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer"], "links": ["https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "https://x.com/FredericLambert/status/1811399467070894094"], "in_operation": false, "in_construction": false, "in_planning": true, "is_active": true, "is_tesla": true, "is_megapack": true}]; generateBatteryList(5, 2, 3, '#projects-table'); generateBatteryMap(projects, 'mapid'); diff --git a/docs/misc/big-battery-projects.csv b/docs/misc/big-battery-projects.csv index a919a28c..d2ece611 100644 --- a/docs/misc/big-battery-projects.csv +++ b/docs/misc/big-battery-projects.csv @@ -1371,3 +1371,4 @@ Ville-sur-Haine,,1393,,,belgium,200,,50,,Eneco,,tesla,megapack,,,planning,2023-0 Collie Battery Stage 2,,1394,,western australia,australia,1363,,341,,neoen,,tesla,megapack 2XL,,224,construction,,2024-05-01,,2025Q4,,,,-33.31,116.29,2,,,https://colliebattery.com.au,https://colliebattery.com.au/2024/05/01/construction-stage2/,,, Orana BESS,wellington,1395,,new south wales,australia,1660,,415,EnergyAustralia,Akaysha Energy,,tesla,megapack 2XL,,,planning,2024-07-15,,,2026,650,AUD,0,-32.527608,148.958942,2,,,,https://x.com/SawyerMerritt/status/1812687836887281794,https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million,, Limondale,balranald,1396,,new south wales,australia,400,,50,,RWE,,tesla,megapack,,,planning,2024-05-28,,,2025Q4,,,,-34.774873,143.526866,2,,location from the balrnald supstation on google maps,,https://x.com/SawyerMerritt/status/1795348622864945179,https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/,, +Glenbrook,glenbrook,1397,,,new zealand,200,,100,,Contact Energy,,tesla,megapack 2XL,,,planning,,,,2026Q1,163,NZD,0,-37.203762,174.734204,2,,location from the steal site and substation,,https://x.com/SawyerMerritt/status/1807635731197702615,https://www.nzherald.co.nz/business/glenbrook-to-get-big-grid-scale-battery-as-contact-teams-up-with-tesla/5KULSHHUVFEWFBSXYU3G42ONEE/,https://www.pv-magazine-australia.com/2024/07/10/contact-teams-with-tesla-on-200-mwh-battery-for-nz/, diff --git a/docs/misc/big-battery-projects.json b/docs/misc/big-battery-projects.json index 2bf526f1..003e9d53 100644 --- a/docs/misc/big-battery-projects.json +++ b/docs/misc/big-battery-projects.json @@ -1 +1 @@ -[{"name": "Kapolei Energy Storage", "city": "", "id": "1", "external_id": "66067", "state": "hawaii", "country": "usa", "capacity_mwh": "565", "estimate_mwh": "", "power_mw": "185", "customer": "Hawaiian Electric", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "158", "status": "operation", "date_first_heard": "", "start_construction": "2021-08-25", "start_operation": "2024-01-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.328169", "long": "-158.105085", "coords_hint": "1", "use_case": "island, black start", "notes": "", "project_website": "https://www.kapoleienergystorage.com/overview", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "link2": "https://twitter.com/Tesla_Megapack/status/1745499330612748482", "link3": "", "link4": ""}, {"name": "Victorian Big Battery", "city": "geelong", "id": "2", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "450", "estimate_mwh": "", "power_mw": "300", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "212", "status": "operation", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.037741", "long": "144.290949", "coords_hint": "1", "use_case": "", "notes": "incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ** 2021-09-03 moving project back to construction", "project_website": "https://victorianbigbattery.com.au/", "link1": "https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "link2": "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "link3": "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "link4": "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"}, {"name": "Saticoy", "city": "oxnard / los angeles", "id": "3", "external_id": "63891", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Arevon", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "142", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-06-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.25773", "long": "-119.158534", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "", "project_website": "", "link1": "https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "link2": "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "link3": "https://arevonenergy.com/location/saticoy/", "link4": ""}, {"name": "California Flats", "city": "monterey county", "id": "4", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "130", "customer": "Apple", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "85", "status": "operation", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.87009", "long": "-120.326403", "coords_hint": "1", "use_case": "130MW solar farm support", "notes": "used the release date of the youtube video as the operation start date", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "link2": "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "link3": "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "link4": "https://www.youtube.com/watch?v=SA3SdlKBtyc"}, {"name": "Nofar Israel", "city": "", "id": "5", "external_id": "", "state": "", "country": "israel", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "Nofar Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.961747", "long": "34.835081", "coords_hint": "0", "use_case": "150mw solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy", "link2": "", "link3": "", "link4": ""}, {"name": "Gambit", "city": "angleton / houston", "id": "6", "external_id": "64528", "state": "texas", "country": "usa", "capacity_mwh": "175", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-08", "start_construction": "2021-03-08", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.168189", "long": "-95.445369", "coords_hint": "1", "use_case": "tesla as energy providor", "notes": "drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger", "project_website": "https://www.gambit-energystorage.com/", "link1": "https://www.teslarati.com/tesla-texas-big-battery-report/", "link2": "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "link3": "https://www.youtube.com/watch?v=OottNRdebs8", "link4": "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"}, {"name": "Moss landing / Elkhorn", "city": "close to santa cruz", "id": "7", "external_id": "62564", "state": "california", "country": "usa", "capacity_mwh": "730", "estimate_mwh": "", "power_mw": "182", "customer": "PG&E", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "256", "status": "operation", "date_first_heard": "", "start_construction": "2020-07-01", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.807971", "long": "-121.781701", "coords_hint": "1", "use_case": "", "notes": "in 2020, 64mwh were added", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "link2": "https://en.wikipedia.org/wiki/Tesla_Megapack", "link3": "", "link4": ""}, {"name": "Hornsdale Power Reserve", "city": "hornsdale", "id": "8", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "194", "estimate_mwh": "", "power_mw": "150", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.085797", "long": "138.518339", "coords_hint": "1", "use_case": "316MW wind farm support", "notes": "42 power packs", "project_website": "https://hornsdalepowerreserve.com.au/", "link1": "https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve", "link2": "", "link3": "", "link4": ""}, {"name": "Osaka Trains", "city": "Osaka", "id": "9", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "42", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.701231", "long": "135.494584", "coords_hint": "0", "use_case": "train station backup", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/telsa-powerpack-osaka-japan/", "link2": "", "link3": "", "link4": ""}, {"name": "Hokkaido", "city": "", "id": "10", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.325369", "long": "142.589328", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market", "link2": "", "link3": "", "link4": ""}, {"name": "Vallecito Energy Storage Resilience (VESR)", "city": "carpinteria / santa barbara county", "id": "11", "external_id": "62801", "state": "california", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Clean Coalition", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "2020-11-05", "start_operation": "2021-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.408083", "long": "-119.512937", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "link2": "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/", "link3": "", "link4": ""}, {"name": "Wallgrove Grid Battery", "city": "Wallgrove / Sydney", "id": "12", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "75", "estimate_mwh": "", "power_mw": "50", "customer": "TransGrid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "cost_million": "65", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-33.817659", "long": "150.828087", "coords_hint": "1", "use_case": "FCAS, synthetic inertia", "notes": "", "project_website": "https://www.transgrid.com.au/wallgrovebattery", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "link2": "https://arena.gov.au/projects/transgrid-wallgrove-battery/", "link3": "", "link4": ""}, {"name": "EReserve 1-9 (9 different locations)", "city": "", "id": "13", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "315", "estimate_mwh": "", "power_mw": "180", "customer": "WCSB Power", "owner": "Enfinite", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "55.740245", "long": "-118.700003", "coords_hint": "1", "use_case": "", "notes": "eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ** the mwh number is from the twitter post", "project_website": "https://ereserve-project.com/", "link1": "http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "link2": "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "link3": "https://x.com/Tesla_Megapack/status/1781467958218469840", "link4": "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"}, {"name": "WindCharger", "city": "", "id": "16", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "10", "customer": "TransAlta", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "9", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "49.582737", "long": "-113.794235", "coords_hint": "1", "use_case": "wind farm support", "notes": "", "project_website": "", "link1": "https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "link2": "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "link3": "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf", "link4": ""}, {"name": "Holes Bay", "city": "Poole", "id": "17", "external_id": "", "state": "dorset", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "7.5", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures BV ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "link2": "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "link3": "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "link4": "https://frv.com/en/projects/holes-bay/"}, {"name": "switch datacenter", "city": "", "id": "18", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "", "customer": "switch", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.058908", "long": "-115.21174", "coords_hint": "0", "use_case": "datacenter", "notes": "", "project_website": "", "link1": "https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/", "link2": "", "link3": "", "link4": ""}, {"name": "Kauai Island", "city": "Kauai", "id": "19", "external_id": "", "state": "hawaii", "country": "usa", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "", "customer": "KIUC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.998353", "long": "-159.378905", "coords_hint": "1", "use_case": "island, 13mw solar farm support", "notes": "20 year contract to buy energy", "project_website": "", "link1": "https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "link2": "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "link3": "https://en.wikipedia.org/wiki/Kauai", "link4": ""}, {"name": "Mira Loma Substation", "city": "Ontario", "id": "20", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "SCE Southern California Edison", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.00548", "long": "-117.566749", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity", "link2": "", "link3": "", "link4": ""}, {"name": "ngen slovenia 2", "city": "Kidrievo", "id": "21", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "15", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "12", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.391223", "long": "15.78985", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/", "link2": "", "link3": "", "link4": ""}, {"name": "ngen slovenia 1", "city": "Jesenice", "id": "22", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "12", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.418237", "long": "14.10062", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.youtube.com/watch?v=v9j-2lsMcJ0", "link2": "", "link3": "", "link4": ""}, {"name": "Alaska Soldotna", "city": "Soldotna Power Plant", "id": "23", "external_id": "57206", "state": "alaska", "country": "usa", "capacity_mwh": "93", "estimate_mwh": "", "power_mw": "46", "customer": "Homer Electric Association", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "37", "status": "operation", "date_first_heard": "2019-12-03", "start_construction": "", "start_operation": "2021-07-23", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "60.500441", "long": "-150.996312", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "link2": "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/", "link3": "", "link4": ""}, {"name": "Colorado ", "city": "Weld County", "id": "24", "external_id": "", "state": "colorado", "country": "usa", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "4", "customer": "United Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.577109", "long": "-104.40854", "coords_hint": "0", "use_case": "", "notes": "could not find exact location though it is operational", "project_website": "", "link1": "https://www.youtube.com/watch?v=dyAhUREGDzA", "link2": "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/", "link3": "", "link4": ""}, {"name": "Nantucket", "city": "Nantucket island", "id": "25", "external_id": "", "state": "massachusetts", "country": "usa", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "6", "customer": "National Grid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.258489", "long": "-70.051666", "coords_hint": "1", "use_case": "island", "notes": "", "project_website": "", "link1": "https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "link2": "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/", "link3": "", "link4": ""}, {"name": "Guildford electric buses", "city": "guildford", "id": "26", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "", "customer": "Zenobe Energy ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.205099", "long": "-0.581772", "coords_hint": "1", "use_case": "bus depot", "notes": "it is a stagecoach bus depot", "project_website": "", "link1": "https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "link2": "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/", "link3": "", "link4": ""}, {"name": "Gannawarra Solar Farm", "city": "", "id": "27", "external_id": "", "state": "victora", "country": "australia", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "25", "customer": "Edify Energy / Wirsol", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-35.734258", "long": "143.780015", "coords_hint": "1", "use_case": "60MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/", "link2": "", "link3": "", "link4": ""}, {"name": "Lake Bonney Wind Farm", "city": "", "id": "28", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "25", "customer": "Infigen Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-37.738826", "long": "140.38693", "coords_hint": "1", "use_case": "278MW wind farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "link2": "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/", "link3": "", "link4": ""}, {"name": "Ta'u island", "city": "Ta'u island", "id": "29", "external_id": "", "state": "american samoa", "country": "usa", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-14.219534", "long": "-169.494626", "coords_hint": "1", "use_case": "island, 1.4MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/", "link2": "", "link3": "", "link4": ""}, {"name": "Samoa", "city": "", "id": "30", "external_id": "", "state": "", "country": "samoa", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-13.885669", "long": "-171.884245", "coords_hint": "1", "use_case": "island", "notes": "2 locations at power station and airport", "project_website": "", "link1": "https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/", "link2": "", "link3": "", "link4": ""}, {"name": "Pinal Central Solar Energy Center", "city": "", "id": "31", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Salt River Project", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.868983", "long": "-111.557171", "coords_hint": "1", "use_case": "20MW solar farm support", "notes": "Added 40 mwh as the youtube video said it can power with 10MW for 4 hours", "project_website": "", "link1": "https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "link2": "https://www.youtube.com/watch?v=e9RuVL3t4jQ", "link3": "", "link4": ""}, {"name": "Terhills", "city": "Terhills", "id": "32", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "29", "estimate_mwh": "", "power_mw": "18", "customer": "Restore", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.006595", "long": "5.711134", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/", "link2": "", "link3": "", "link4": ""}, {"name": "Ozop New York", "city": "new york city / brooklyn", "id": "33", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "2", "customer": "Ozop Energy Systems", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.645624", "long": "-73.940749", "coords_hint": "0", "use_case": "peak shaving", "notes": "together with stem athena software", "project_website": "", "link1": "https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "link2": "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html", "link3": "", "link4": ""}, {"name": "Goleta Energy Storage Project", "city": "Goleta", "id": "34", "external_id": "66394", "state": "california", "country": "usa", "capacity_mwh": "160", "estimate_mwh": "", "power_mw": "60", "customer": "Goleta Energy Storage, LLC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "62", "status": "operation", "date_first_heard": "2019-11-13", "start_construction": "", "start_operation": "2023-12-05", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.43274", "long": "-119.869283", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "the planning document on the website has a lot of detail", "project_website": "https://www.cityofgoleta.org/city-hall/planning-and-environmental-review/ceqa-review/cortona-battery-storage-project", "link1": "https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2", "link2": "", "link3": "", "link4": ""}, {"name": "Contego", "city": "Hurstpierpoint", "id": "35", "external_id": "", "state": "west sussex", "country": "uk", "capacity_mwh": "68", "estimate_mwh": "", "power_mw": "34", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "28", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.955104", "long": "-0.163008", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.harmonyenergy.co.uk/projects/", "link1": "https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "link2": "https://www.youtube.com/watch?v=zh6PFeObrHs", "link3": "", "link4": ""}, {"name": "Trents Energy Storage", "city": "St. Lucy", "id": "36", "external_id": "", "state": "", "country": "barbados", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "5", "customer": "Barbados Light & Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "13.293125", "long": "-59.627449", "coords_hint": "1", "use_case": "island, solar farm support", "notes": "", "project_website": "", "link1": "https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "link2": "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/", "link3": "", "link4": ""}, {"name": "Moss Landing", "city": "Moss Landing", "id": "37", "external_id": "260", "state": "california", "country": "usa", "capacity_mwh": "1600", "estimate_mwh": "", "power_mw": "400", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "LG", "type": "", "cells": "LG", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-02-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.806072", "long": "-121.782258", "coords_hint": "1", "use_case": "", "notes": "TR1200 rack design with JH4 cell, 4500+ racks, two stages here ** incident: septemter 2021 the first phase 1200 MWh was shut down after an overheating triggered the sprinkler system. ", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://www.energy-storage.news/manufacturer-reveals-involvement-in-worlds-biggest-battery-energy-storage-system-so-far/", "link2": "https://insideevs.com/news/489894/vistra-moss-landing-energy-storage-world-largest/", "link3": "https://reneweconomy.com.au/worlds-biggest-battery-sidelined-after-overheating-incident-in-california/", "link4": ""}, {"name": "Docordova", "city": "Hood County", "id": "38", "external_id": "8063", "state": "texas", "country": "usa", "capacity_mwh": "260", "estimate_mwh": "", "power_mw": "260", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.430077", "long": "-97.695028", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://urjadaily.com/vistra-brings-worlds-largest-utility-scale-battery-energy-storage-system-online/", "link2": "", "link3": "", "link4": ""}, {"name": "Oakland", "city": "Oakland", "id": "39", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "36", "estimate_mwh": "", "power_mw": "145", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.79422", "long": "-122.20837", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton 2", "city": "Upton County", "id": "40", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "42", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.255119", "long": "-102.246596", "coords_hint": "0", "use_case": "180MW solar farm support", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://www.energy-storage.news/us-utility-vistra-plans-texas-solar-storage-facilities-alongside-6-8gw-of-coal-retirement-by-2027/", "link2": "https://www.luminant.com/upton-2-solar-power-plant-energy-storage-facility/", "link3": "", "link4": ""}, {"name": "Morro Bay", "city": "Morro Bay", "id": "41", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "2400", "estimate_mwh": "", "power_mw": "600", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.374224", "long": "-120.858684", "coords_hint": "1", "use_case": "", "notes": "revitalise existing gas power plant site, start construction in 2022 should take 36-48 month to complete", "project_website": "", "link1": "https://www.energy-storage.news/vistra-proposes-california-battery-project-twice-the-size-of-worlds-largest-facility-to-date/", "link2": "http://www.morrobayca.gov/documentcenter/view/15093", "link3": "", "link4": ""}, {"name": "Big Star", "city": "Bastrop County", "id": "42", "external_id": "64202", "state": "texas", "country": "usa", "capacity_mwh": "120", "estimate_mwh": "", "power_mw": "80", "customer": "RWE Renewables", "owner": "", "developer": "", "manufacturer": "LG", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.913908", "long": "-97.289792", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/rwe-signs-up-corporate-offtaker-for-big-star-texas-solar-plus-storage-project/", "link2": "https://www.rwe.com/en/press/rwe-renewables/2021-08-25-rwe-teams-up-with-constellation-to-supply-major-us-commercial-customers-with-solar-energy-from-big-star-facility", "link3": "", "link4": ""}, {"name": "Hickory Park", "city": "Mitchell County", "id": "43", "external_id": "63522", "state": "georgia", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "40", "customer": "RWE Renewables", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "GridSolv Quantum", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-11-17", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.31621", "long": "-84.124752", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "2021: 30 year PPA with Georgia Power", "project_website": "", "link1": "https://www.energy-storage.news/lg-energy-solution-supplying-800mwh-battery-storage-for-rwes-us-solar-plus-storage-projects/", "link2": "https://www.rwe.com/en/press/rwe-renewables/2020-11-17-rwes-hickory-park-solar-project-with-co-located-storage-facility-under-construction", "link3": "", "link4": ""}, {"name": "Hubei Flow Battery", "city": "Xiangyang", "id": "44", "external_id": "", "state": "hubei", "country": "china", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "100", "customer": "Hubei Pingfan Ruifeng New Energy Technology", "owner": "", "developer": "", "manufacturer": "VRB Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-05-21", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.075783", "long": "112.145275", "coords_hint": "0", "use_case": "500MW rooftop solar support", "notes": "Vanadium flow battery, built in phases", "project_website": "", "link1": "https://www.energy-storage.news/vrb-energy-breaks-ground-on-100mw-500mwh-flow-battery-and-gigafactory-in-china/", "link2": "https://vrbenergy.com/vrb-energy-announces-agreement-for-chinas-largest-solar-battery-a-100mw-solar-storage-project-in-hubei-province/", "link3": "", "link4": ""}, {"name": "Riverina 1 + 2 / Darlington Point Energy Storage", "city": "Darlington Point", "id": "45", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "Edify Energy / Shell", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.646927", "long": "146.03516", "coords_hint": "1", "use_case": "333MW solar farm support", "notes": "it says on the project website that the 3 projects are colocated, so combined them here into just one entry", "project_website": "https://edifyenergy.com/project/riverina-darlington-point/", "link1": "https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "link2": "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "link3": "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "link4": "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"}, {"name": "Alamitos", "city": "Long Beach / Los Angeles", "id": "46", "external_id": "61204", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Southern California Edison (SCE)", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Advancion 5", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-06-01", "start_operation": "2021-01-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.770365", "long": "-118.101597", "coords_hint": "1", "use_case": "gas peaker plant replacement, 20 year ppa", "notes": "", "project_website": "", "link1": "https://blog.fluenceenergy.com/aes-fluence-commission-alamitos-energy-storage-facility-long-beach-california", "link2": "https://blog.fluenceenergy.com/fluence-aes-alamitos-battery-energy-storage-system-made-history", "link3": "https://www.energy-storage.news/battery-storage-as-peaking-capacity-how-alamitos-changed-the-game-for-california/", "link4": ""}, {"name": "Diablo", "city": "Pittsburg", "id": "47", "external_id": "62175", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "LS Power / PG & E", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-30", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.015262", "long": "-121.846146", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/direct-energy-business-to-use-some-of-worlds-biggest-battery-projects-to-serve-california-customers/", "link2": "https://www.lspower.com/project-map/", "link3": "https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21131879/pge-poised-to-expand-battery-energy-storage-capacity-by-more-than-420-mw", "link4": ""}, {"name": "Gateway ", "city": "East Otey Mesa / San Diego", "id": "48", "external_id": "63834", "state": "california", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "LG", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-09-01", "start_operation": "2020-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.570558", "long": "-116.910955", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://vimeo.com/429223580", "link3": "https://en.wikipedia.org/wiki/Gateway_Energy_Storage", "link4": ""}, {"name": "Vista", "city": "Vista", "id": "49", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "40", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.20395", "long": "-117.253731", "coords_hint": "0", "use_case": "", "notes": "no source about the capacity", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://www.mapsearch.com/power-plant/vista-energy-storage-system/", "link3": "", "link4": ""}, {"name": "LeConte", "city": "Calexico / Imperial County", "id": "50", "external_id": "64701", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "125", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.67641", "long": "-115.670255", "coords_hint": "1", "use_case": "", "notes": "planning doc is available", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://ceqanet.opr.ca.gov/2010111056/7", "link3": "", "link4": ""}, {"name": "Ravenswood", "city": "Long Island City / Queens", "id": "51", "external_id": "2500", "state": "new york", "country": "usa", "capacity_mwh": "2528", "estimate_mwh": "", "power_mw": "316", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-02-01", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.761642", "long": "-73.944275", "coords_hint": "1", "use_case": "", "notes": "planning doc is available ** 2021-02-03: project could be delayed until 2024 ", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "http://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B4A8305F4-BECF-46EE-B493-A088AA7AA8F6%7D&usg=AOvVaw2Yrkm30CAqrxvAShHegBAw", "link3": "https://www.spglobal.com/marketintelligence/en/news-insights/latest-news-headlines/lacking-contract-ls-power-delays-major-battery-storage-station-in-ny-62467197", "link4": ""}, {"name": "Korea Zinc", "city": "ulsan", "id": "52", "external_id": "", "state": "", "country": "south korea", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "32", "customer": "Korea Zinc", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-07-27", "start_construction": "", "start_operation": "2018-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.430406", "long": "129.340086", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://pulsenews.co.kr/view.php?year=2017&no=505105", "link2": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "link3": "https://www.koreazinc.co.kr/english/company/page/headOffice.aspx", "link4": ""}, {"name": "Seosan", "city": "seosan", "id": "53", "external_id": "", "state": "", "country": "south korea", "capacity_mwh": "140", "estimate_mwh": "", "power_mw": "52", "customer": "", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.636988", "long": "126.363673", "coords_hint": "1", "use_case": "65MW solar farm support", "notes": "", "project_website": "", "link1": "https://en.wikipedia.org/wiki/Battery_storage_power_station", "link2": "", "link3": "", "link4": ""}, {"name": "Solaseado", "city": "Haenam County", "id": "54", "external_id": "", "state": "jeolla", "country": "south korea", "capacity_mwh": "305", "estimate_mwh": "", "power_mw": "72", "customer": "Kospo", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-04-10", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.709899", "long": "126.41275", "coords_hint": "1", "use_case": "98MW solar farm support", "notes": "not sure whether Solaseado or Solasido is correct spelling", "project_website": "", "link1": "https://krenewables.com/solar/kospo-ignites-koreas-biggest-pv-farm/", "link2": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "link3": "", "link4": ""}, {"name": "Minety", "city": "Minety", "id": "55", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "133", "estimate_mwh": "", "power_mw": "100", "customer": "Penso Power / China Huaneng Group / CNIC", "owner": "", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "LFP CATL, NMC Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-12-01", "start_operation": "2020-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.605997", "long": "-2.003146", "coords_hint": "1", "use_case": "", "notes": "PPA from shell, when second stage is complete it will be 150MW/266MWh", "project_website": "https://www.pensopower.com/", "link1": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-nsenergy-minety-55", "link2": "https://www.energy-storage.news/what-we-know-about-europes-largest-grid-connected-battery-project-so-far/", "link3": "https://eclipsepower.co.uk/project/minety-battery-storage/", "link4": ""}, {"name": "Yorkshire", "city": "yorkshire", "id": "56", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "27", "customer": "", "owner": "", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.949604", "long": "-1.190935", "coords_hint": "0", "use_case": "34MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/industry-updates/yorkshire-uk-europes-largest-unsubsidized-solar-plus-storage-project/", "link2": "", "link3": "", "link4": ""}, {"name": "Gateway Energy Project", "city": "London Gateway port/ essex", "id": "57", "external_id": "10309", "state": "", "country": "uk", "capacity_mwh": "900", "estimate_mwh": "", "power_mw": "320", "customer": "Intergen", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Gridstack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.512649", "long": "0.493992", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.intergen.com/our-technologies/development-projects/gateway-energy-centre/", "link1": "https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec", "link2": "", "link3": "", "link4": ""}, {"name": "Spalding", "city": "spalding", "id": "58", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "170", "customer": "Intergen", "owner": "", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.805112", "long": "-0.133741", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.intergen.com/our-technologies/development-projects/spalding-energy-park/", "link1": "https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec", "link2": "", "link3": "", "link4": ""}, {"name": "Antofagasta", "city": "Atacama Desert", "id": "59", "external_id": "", "state": "", "country": "chile", "capacity_mwh": "560", "estimate_mwh": "", "power_mw": "112", "customer": "AES Gener", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Sunstack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-19", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-24.014801", "long": "-68.58494", "coords_hint": "0", "use_case": "253MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/aes-begins-work-on-560mwh-largest-battery-system-in-latin-america-for-solar-and-wind-in-chile/", "link2": "https://www.renpp.eu/en/solar-project/andes-solar-park-1018", "link3": "", "link4": ""}, {"name": "Desert Quartize", "city": "Riverside County", "id": "60", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "", "customer": "EDF / Clean Power Alliance", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-15", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.586379", "long": "-114.785106", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "", "link1": "https://eplanning.blm.gov/eplanning-ui/project/68211/570", "link2": "https://www.blm.gov/press-release/blm-approves-desert-quartzite-solar-project-riverside-county", "link3": "https://www.energy-storage.news/california-community-group-signs-ppa-for-edfs-300mw-desert-quartzite-solar-plus-storage-project/", "link4": ""}, {"name": "Rexford Solar Farm", "city": "Tulare County", "id": "61", "external_id": "64633", "state": "california", "country": "usa", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "180", "customer": "8minute / Clean Power Alliance", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-11", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.853593", "long": "-119.051695", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "already a large solar farm visible on google maps, but the planning doc shows it will be on new locations between existing solar farm", "project_website": "https://www.8minute.com/energy-storage/", "link1": "https://www.energy-storage.news/california-community-energy-group-signs-ppa-for-400mw-540mwh-solar-plus-storage-plant/", "link2": "https://tularecounty.ca.gov/rma/index.cfm/planning-building/environmental-planning/environmental-impact-reports/rexford-solar-project-psp-19-073/", "link3": "", "link4": ""}, {"name": "Eland Solar", "city": "Kern County", "id": "62", "external_id": "61168", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "8minute / Capital Dynamics / LADWP", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-22", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.198008", "long": "-117.991201", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "location from planning doc ** partially online in 2022, fully in 2023", "project_website": "", "link1": "https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "link2": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link3": "", "link4": ""}, {"name": "Sonoran Energy Center", "city": "Buckeye", "id": "63", "external_id": "66627", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "260", "customer": "Salt River Project", "owner": "NextEra Energy Resources", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.23927", "long": "-112.570054", "coords_hint": "2", "use_case": "solar", "notes": "", "project_website": "https://www.nexteraenergyresources.com/sonoran-solar/project-overview.html", "link1": "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "link2": "https://pv-magazine-usa.com/2021/08/11/nextera-will-build-a-solar-storage-project-with-salt-river-project-as-offtaker/", "link3": "", "link4": ""}, {"name": "Blythe II Storage Project", "city": "Riverside County", "id": "64", "external_id": "60092", "state": "california", "country": "usa", "capacity_mwh": "460", "estimate_mwh": "", "power_mw": "115", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Samsung", "type": "", "cells": "Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2013-04-22", "start_construction": "", "start_operation": "2021-02-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.676313", "long": "-114.75575", "coords_hint": "1", "use_case": "solar", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "https://ieefa.org/nextera-brings-first-section-of-massive-california-battery-storage-complex-online/", "link3": "", "link4": ""}, {"name": "Blythe III Storage Project", "city": "Riverside County", "id": "65", "external_id": "60094", "state": "california", "country": "usa", "capacity_mwh": "460", "estimate_mwh": "", "power_mw": "115", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Samsung", "type": "", "cells": "Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-02-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.673021", "long": "-114.754474", "coords_hint": "1", "use_case": "solar", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "", "link3": "", "link4": ""}, {"name": "McCoy Storage Project", "city": "Riverside County", "id": "66", "external_id": "58462", "state": "california", "country": "usa", "capacity_mwh": "920", "estimate_mwh": "", "power_mw": "230", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.664118", "long": "-114.749852", "coords_hint": "1", "use_case": "250MW solar farm support", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "", "link3": "", "link4": ""}, {"name": "Storey Energy Center", "city": "Coolidge", "id": "67", "external_id": "65956", "state": "arizona", "country": "usa", "capacity_mwh": "264", "estimate_mwh": "", "power_mw": "88", "customer": "Salt River Project", "owner": "NextEra Energy Resources", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.8882", "long": "-111.4978", "coords_hint": "1", "use_case": "88 MW solar farm support", "notes": "", "project_website": "https://www.nexteraenergyresources.com/storey-solar.html", "link1": "https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/Storey%20Solar%20Open%20House%20Slides_final%20for%20NEER%20website.pdf", "link2": "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "link3": "", "link4": ""}, {"name": "Edwards Sanborn Solar Storage", "city": "Kern County", "id": "68", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "2445", "estimate_mwh": "", "power_mw": "346", "customer": "Terra-Gen", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "LG & Samsung", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-12-10", "start_construction": "2021-02-01", "start_operation": "", "start_estimated": "2022Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.911468", "long": "-117.889716", "coords_hint": "0", "use_case": "1118 MW solar farm support", "notes": "735 MWh in Q3 '21, 1501 MWh by Q2 2022.", "project_website": "", "link1": "https://renewablesnow.com/news/terra-gen-secures-usd-800m-for-massive-solar-storage-project-in-california-749635/", "link2": "https://pv-magazine-usa.com/2021/08/02/terra-gen-secures-800-million-in-financing-for-solar-storage-project-in-california/", "link3": "https://pv-magazine-usa.com/2020/12/11/morning-brief-big-home-batteries-from-lg-energy-terra-gen-and-mortenson-start-on-worlds-largest-standalone-solar-and-storage-project/", "link4": ""}, {"name": "Tranquility Storage Retrofit", "city": "Cantua Creek", "id": "69", "external_id": "59939", "state": "california", "country": "usa", "capacity_mwh": "288", "estimate_mwh": "", "power_mw": "72", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Powin", "type": "", "cells": "Mitsubishi", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-05-01", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.591626", "long": "-120.404965", "coords_hint": "1", "use_case": "200 MW solar farm support", "notes": "LFP batteries", "project_website": "", "link1": "https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "link2": "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref", "link3": "", "link4": ""}, {"name": "Garland Storage Retrofit", "city": "Kern County", "id": "70", "external_id": "60233", "state": "california", "country": "usa", "capacity_mwh": "352", "estimate_mwh": "", "power_mw": "88", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Powin", "type": "", "cells": "Mitsubishi", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-05-01", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.829699", "long": "-118.510184", "coords_hint": "1", "use_case": "200 MW solar farm support", "notes": "LFP batteries", "project_website": "https://www.southernpowercompany.com/content/dam/southernpower/pdfs/fact-sheets/Garland_Energy_Storage_factsheet.pdf", "link1": "https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "link2": "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref", "link3": "", "link4": ""}, {"name": "Manatee", "city": "Parrish / Manatee County", "id": "71", "external_id": "60014", "state": "florida", "country": "usa", "capacity_mwh": "900", "estimate_mwh": "", "power_mw": "409", "customer": "Florida Power and Light (FPL)", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-03-01", "start_construction": "2021-02-02", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "27.598383", "long": "-82.349213", "coords_hint": "1", "use_case": "solar farm support", "notes": "Already 75% complete in August 2021, 132 shipping containers", "project_website": "", "link1": "https://www.world-energy.org/article/19846.html", "link2": "https://www.youtube.com/watch?v=ZYbvXAS9buQ", "link3": "https://www.energy-storage.news/work-begins-on-409mw-900mwh-florida-battery-project-to-ease-natural-gas-plants-into-retirement/", "link4": ""}, {"name": "Crimson", "city": "Riverside County", "id": "72", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "1400", "estimate_mwh": "", "power_mw": "350", "customer": "Recurrent Energy / Axium Infrastructure", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.705099", "long": "-115.804279", "coords_hint": "0", "use_case": "", "notes": "construction is expected to start in q3 2021, location is 35miles northwest of substation near blythe / colorado river substation", "project_website": "https://recurrentenergy.com/project-portfolio/#", "link1": "https://www.energy-storage.news/canadian-solar-sells-majority-stake-in-1-4gwh-california-battery-energy-storage-project/", "link2": "https://www.energy-storage.news/us-doi-gives-green-light-to-350mw-1400mwh-energy-storage-project-in-california/", "link3": "", "link4": ""}, {"name": "Slate", "city": "Kings County", "id": "73", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "561", "estimate_mwh": "", "power_mw": "140", "customer": "Recurrent Energy / Goldman Sachs Renewables Power (GSRP)", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.227583", "long": "-119.877056", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/slate/", "link1": "https://www.energy-storage.news/progress-report-some-more-of-us-biggest-battery-projects-taking-shape/", "link2": "https://ceqanet.opr.ca.gov/2019069068/2", "link3": "", "link4": ""}, {"name": "Mustang", "city": "Kings County", "id": "74", "external_id": "59150", "state": "california", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "75", "customer": "Recurrent Energy / Goldman Sachs Renewables Power (GSRP)", "owner": "", "developer": "", "manufacturer": "byd", "type": "", "cells": "LFP", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.245785", "long": "-119.904115", "coords_hint": "0", "use_case": "100MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/mustang-solar-storage/", "link1": "https://www.energy-storage.news/canadian-solar-will-retrofit-300mwh-of-batteries-at-goldman-sachss-mustang-solar-plant-california/", "link2": "", "link3": "", "link4": ""}, {"name": "Papago", "city": "Maricopa County", "id": "75", "external_id": "66779", "state": "arizona", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "", "power_mw": "300", "customer": "Recurrent Energy", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.481046", "long": "-113.03863", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/papago/", "link1": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/7254?fileID=56298", "link2": "", "link3": "", "link4": ""}, {"name": "Clay Tye", "city": "Upminster", "id": "76", "external_id": "", "state": "essex", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures (FRV)", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552193", "long": "0.297889", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "link2": "https://x.com/Tesla_Megapack/status/1775254497973202985", "link3": "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/", "link4": ""}, {"name": "Malita", "city": "Malita", "id": "77", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "6.398523", "long": "125.617282", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/fluence-completes-first-projects-in-470mw-470mwh-philippines-battery-order/", "link2": "", "link3": "", "link4": ""}, {"name": "Toledo", "city": "Toledo", "id": "78", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "10.388901", "long": "123.642096", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "link2": "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/", "link3": "", "link4": ""}, {"name": "Limay", "city": "Limay / Bataan", "id": "79", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "40", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "14.545475", "long": "120.599531", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "link2": "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/", "link3": "", "link4": ""}, {"name": "Torrens Island", "city": "Adelaide", "id": "80", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "AGL Energy Limited", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-09-08", "start_construction": "2021-11-29", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.803262", "long": "138.523477", "coords_hint": "0", "use_case": "", "notes": "might become a 4h / 1000MWh system at a later stage, the coords are probably correct from the satellite image", "project_website": "", "link1": "https://www.wartsila.com/media/news/09-08-2021-agl-and-wartsila-advance-frame-agreement-with-first-energy-storage-project-on-path-to-grid-decarbonisation-2954567", "link2": "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-media-release---agl-breaks-ground-for-torrens-island-grid-sc", "link3": "", "link4": ""}, {"name": "Coventry Energy Superhub", "city": "Coventry", "id": "81", "external_id": "", "state": "west midlands", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "100", "customer": "Pivot Power (EDF Renewables)", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.404409", "long": "-1.525063", "coords_hint": "0", "use_case": "EV charging support", "notes": "", "project_website": "https://www.pivot-power.co.uk/our-projects/#", "link1": "https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/", "link2": "", "link3": "", "link4": ""}, {"name": "Bustleholmel Energy Superhub", "city": "Sandwell", "id": "82", "external_id": "", "state": "west midlands", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "100", "customer": "Pivot Power (EDF Renewables)", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.543952", "long": "-1.981982", "coords_hint": "0", "use_case": "EV charging support", "notes": "", "project_website": "https://www.pivot-power.co.uk/our-projects/#", "link1": "https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/", "link2": "", "link3": "", "link4": ""}, {"name": "Werne", "city": "Werne", "id": "83", "external_id": "SEE971932533266", "state": "nrw", "country": "germany", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "72", "customer": "RWE", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-26", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.674854", "long": "7.712175", "coords_hint": "0", "use_case": "frequency balancing", "notes": "", "project_website": "", "link1": "https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "link2": "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "link3": "", "link4": ""}, {"name": "Lingen / Emsland", "city": "Lingen", "id": "84", "external_id": "SEE905843309764", "state": "lower saxony", "country": "germany", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "45", "customer": "RWE", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-26", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.481565", "long": "7.300968", "coords_hint": "0", "use_case": "frequency balancing", "notes": "", "project_website": "", "link1": "https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "link2": "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "link3": "", "link4": ""}, {"name": "Wunsiedel", "city": "Wunsiedel", "id": "85", "external_id": "", "state": "bavaria", "country": "germany", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Siemens", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.041482", "long": "12.029522", "coords_hint": "0", "use_case": "hydrogen plant support", "notes": "2021: just a letter of intent", "project_website": "", "link1": "https://www.energy-storage.news/siemens-and-fluence-to-build-renewables-integrating-100mw-200mwh-battery-project-in-germany/", "link2": "", "link3": "", "link4": ""}, {"name": "Luenen", "city": "Luenen", "id": "86", "external_id": "SEE905490507995", "state": "nrw", "country": "germany", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Mercedes Benz Energy / The Mobility House", "developer": "", "manufacturer": "", "type": "ev battery", "cells": "", "no_of_battery_units": "1000", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.619937", "long": "7.471047", "coords_hint": "1", "use_case": "frequency balancing", "notes": "second life EV battery storage with smart fortwo batteries", "project_website": "", "link1": "https://www.mobilityhouse.com/int_en/magazine/press-releases/worlds-largest-2nd-use-battery-storage-is-starting-up.html/", "link2": "https://www.youtube.com/watch?v=dDKVnp7_jrs", "link3": "", "link4": ""}, {"name": "Hanover / Herrenhausen", "city": "Hanover", "id": "87", "external_id": "SEE953605889740", "state": "lower saxony", "country": "germany", "capacity_mwh": "17", "estimate_mwh": "", "power_mw": "", "customer": "enercity", "owner": "Mercedes Benz Energy", "developer": "", "manufacturer": "", "type": "ev battery", "cells": "", "no_of_battery_units": "3240", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.398301", "long": "9.681795", "coords_hint": "1", "use_case": "frequency balancing", "notes": "first and second life EV battery storage with smart car batteries", "project_website": "", "link1": "https://www.daimler.com/sustainability/resources/battery-storage-daimler-and-enercity.html", "link2": "https://www.electrive.net/2017/10/23/daimler-batterie-ersatzteillager-fuer-elektroautos-am-netz/", "link3": "https://www.youtube.com/watch?v=dDKVnp7_jrs", "link4": ""}, {"name": "Permian Energy Center", "city": "Andrews Country", "id": "88", "external_id": "63255", "state": "texas", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "40", "customer": "ExxonMobil", "owner": "Orsted", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-11-01", "start_operation": "2021-05-04", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.121853", "long": "-102.529659", "coords_hint": "1", "use_case": "420MW solar farm support", "notes": "built on a depleted oil field in the Permian Basin ** 2018: 12 year PPA with Exxon Mobil ** got exact location from the 2020 amended agreement doc on texas.gov site", "project_website": "https://orsted.com/en/our-business/solar-and-battery-storage/our-solar-and-storage-centers", "link1": "https://orsted.com/en/media/newsroom/news/2021/05/885212783010106", "link2": "https://www.nsenergybusiness.com/projects/permian-energy-centre/#", "link3": "https://comptroller.texas.gov/economy/local/ch313/agreement-docs-details.php?id=1411", "link4": ""}, {"name": "Carnegie Road", "city": "Liverpool", "id": "89", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Orsted", "developer": "", "manufacturer": "NEC Energy Solutions (LG)", "type": "40ft container", "cells": "", "no_of_battery_units": "3", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.419403", "long": "-2.928747", "coords_hint": "1", "use_case": "", "notes": "according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021 ** incident: fire at the site on 15.9.2020", "project_website": "https://orsted.com/en/our-business/solar-and-battery-storage/our-solar-and-storage-centers", "link1": "https://www.energy-storage.news/nec-delivers-orsteds-first-20mw-standalone-grid-battery-project/", "link2": "https://www.neces.com/experience#project-gallery", "link3": "https://www.energy-storage.news/fire-at-20mw-uk-battery-storage-plant-in-liverpool/", "link4": ""}, {"name": "Jardelund", "city": "Jardelund", "id": "90", "external_id": "SEE999790559914", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "51", "estimate_mwh": "", "power_mw": "48", "customer": "", "owner": "EnspireME (JV Eneco / Mitsubishi)", "developer": "", "manufacturer": "NEC Energy Solutions (LG)", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-10-01", "start_operation": "2018-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.851435", "long": "9.194775", "coords_hint": "1", "use_case": "frequency balancing", "notes": "according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021", "project_website": "https://www.neces.com/project/jardelund-germany-48-mw-51-mwh-2/", "link1": "https://www.youtube.com/watch?v=UheTmGO7BN0", "link2": "https://www.energy-storage.news/50mwh-battery-completed-in-germany-claims-europes-largest-crown/", "link3": "", "link4": ""}, {"name": "Oxford Energy Superhub", "city": "Cowley / Oxford", "id": "91", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Pivot Power (EDF Renewables)", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.709722", "long": "-1.189592", "coords_hint": "1", "use_case": "EV charging support", "notes": "Exact location from burnell website pictures", "project_website": "https://energysuperhuboxford.org/", "link1": "https://www.euractiv.com/section/electricity/news/uks-first-grid-scale-battery-storage-system-comes-online-in-oxford/", "link2": "https://www.burnell.uk.com/energy-superhub-oxford/", "link3": "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "link4": ""}, {"name": "Kemsley Energy Superhub", "city": "Kemsley", "id": "92", "external_id": "7368", "state": "kent", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Pivot Power (EDF Renewables)", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "construction start date from youtube video", "project_website": "https://www.pivot-power.co.uk/our-projects/", "link1": "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "link2": "https://www.youtube.com/watch?v=od2h3syN8P4&t=2s", "link3": "", "link4": ""}, {"name": "Mardyck", "city": "Dunkirk", "id": "93", "external_id": "", "state": "", "country": "france", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "25", "customer": "RTE", "owner": "Total", "developer": "", "manufacturer": "Saft", "type": "Intensium Max 20 High Energy (20ft container)", "cells": "NMC", "no_of_battery_units": "11", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-02-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.029549", "long": "2.252929", "coords_hint": "2", "use_case": "frequency balancing", "notes": "saft is owned by total", "project_website": "", "link1": "https://www.energy-storage.news/frances-biggest-battery-storage-system-at-25mw-goes-into-operation/", "link2": "https://totalenergies.com/media/news/press-releases/total-build-largest-battery-based-energy-storage-project-france", "link3": "https://www.saftbatteries.com/products-solutions/products/intensium\ufffd-max-20-high-energy", "link4": ""}, {"name": "Ringo-Vingeanne", "city": "Jalancourt", "id": "94", "external_id": "", "state": "Cote-d\u2019or", "country": "france", "capacity_mwh": "24", "estimate_mwh": "", "power_mw": "12", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Nidec ASI", "type": "40ft container", "cells": "LG Chem NMC", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-10-01", "start_operation": "2021-07-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "47.510967", "long": "5.367566", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "rte website and energy storage news list two different capacities for site ** exact location from rte press photo which is close to lake ** 2021: it is an expirment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/actualites/le-projet-ringo-de-rte-accueille-ses-premiers-equipements-en-cote-dor", "link3": "https://www.energy-storage.news/french-grid-operators-software-controlled-battery-experiment-begins/", "link4": ""}, {"name": "Ringo-Bellac", "city": "Bellac", "id": "95", "external_id": "", "state": "haute-vienne", "country": "france", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "10", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Saft", "type": "", "cells": "Tianneng", "no_of_battery_units": "12", "status": "construction", "date_first_heard": "", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.104588", "long": "1.04347", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "2021: experiment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-renouvelable-lexperimentation-ringo-bellac-haute-vienne", "link3": "", "link4": ""}, {"name": "Ringo-Ventavon", "city": "Ventavon", "id": "96", "external_id": "", "state": "", "country": "france", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "10", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Blue Solutions", "type": "Blue LMP", "cells": "Bollore LMP", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "44.344414", "long": "5.915866", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "2021: experiment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-lexperimentation-ringo-ventavon", "link3": "https://www.engie-solutions.com/en/news/renewable-energy-storage", "link4": ""}, {"name": "Netzbooster Kupferzell", "city": "Kupferzell", "id": "97", "external_id": "", "state": "bw", "country": "germany", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "TransnetBW", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-01", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "cost_million": "200", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "49.232801", "long": "9.694664", "coords_hint": "0", "use_case": "virtual transmission lines", "notes": "this is a pilot project and still it takes 5 years to build, will be interesting how long they will take for real projects then, ca 200 Million Euro costs", "project_website": "https://www.transnetbw.de/de/netzentwicklung/projekte/netzbooster-pilotanlage/projektueberblick", "link1": "https://www.transnetbw.de/files/pdf/netzentwicklung/projekte/netzbooster-pilotanlage/Vorstellung_Netzbooster.pdf", "link2": "https://www.energy-storage.news/fluence-building-250mw-grid-booster-battery-storage-system-for-german-tso-transnetbw/", "link3": "", "link4": ""}, {"name": "Edwards", "city": "Edwards", "id": "98", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.413627", "long": "-88.058471", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, {"name": "Havana", "city": "Havana", "id": "99", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.279711", "long": "-90.079133", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, {"name": "EEI/Joppa", "city": "Joppa", "id": "100", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.211346", "long": "-88.859049", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, {"name": "Arroyo", "city": "McKinley County", "id": "101", "external_id": "63172", "state": "new mexico", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "PNM", "owner": "DE Shaw Renewable Investments (DSRI)", "developer": "Affordable Solar", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-03", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "450", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.9703", "long": "-107.5631", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ** the testimony link has a lot of info ** got the location info from the gem wiki", "project_website": "", "link1": "https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "link2": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link3": "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "link4": "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"}, {"name": "Jicarilla", "city": "", "id": "102", "external_id": "", "state": "new mexico", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "93", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.269283", "long": "-107.562816", "coords_hint": "0", "use_case": "50MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, {"name": "San Juan 1", "city": "", "id": "103", "external_id": "66574", "state": "new mexico", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "430", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.804042", "long": "-108.445356", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, {"name": "201LC 8me", "city": "", "id": "104", "external_id": "", "state": "new mexico", "country": "usa", "capacity_mwh": "120", "estimate_mwh": "", "power_mw": "30", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "188", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.619911", "long": "-107.815013", "coords_hint": "0", "use_case": "100MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, {"name": "Gemini", "city": "Las Vegas", "id": "105", "external_id": "63352", "state": "nevada", "country": "usa", "capacity_mwh": "1400", "estimate_mwh": "", "power_mw": "380", "customer": "", "owner": "Primergy Solar (Quinbrook)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-13", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "cost_million": "1000", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.474167", "long": "-114.784706", "coords_hint": "1", "use_case": "690MW solar farm support", "notes": "from the planning docs, it seems battery containers will be split out across the solar farm, that is why the location was set to exact", "project_website": "https://www.primergysolar.com/portfolio", "link1": "https://www.energy-storage.news/us-dept-of-interior-approves-690mw-nevada-solar-plant-with-1400mwh-energy-storage-component/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/100498/570", "link3": "", "link4": ""}, {"name": "Iron Point", "city": "Humboldt County", "id": "106", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "NV Energy", "developer": "Primergy Solar (Quinbrook)", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.900046", "long": "-117.291845", "coords_hint": "1", "use_case": "250MW solar farm support", "notes": "", "project_website": "", "link1": "https://eplanning.blm.gov/eplanning-ui/project/2000966", "link2": "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "link3": "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/", "link4": ""}, {"name": "Hot Pot", "city": "Humboldt County", "id": "107", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "1120", "estimate_mwh": "", "power_mw": "280", "customer": "", "owner": "NV Energy", "developer": "Primergy Solar (Quinbrook)", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.886191", "long": "-117.104592", "coords_hint": "0", "use_case": "350MW solar farm support", "notes": "in the planning doc the project name also includes iron pot 2 solar plant", "project_website": "", "link1": "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/2013178/510", "link3": "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/", "link4": ""}, {"name": "Dry Lake", "city": "Clark County", "id": "108", "external_id": "63933", "state": "nevada", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "NV Energy", "developer": "NV Energy", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.419928", "long": "-114.895856", "coords_hint": "1", "use_case": "150mw solar farm support", "notes": "in the planning doc, they list 3 BESS options, picked option 1 for the coordinates (but might be wrong)", "project_website": "", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/2000468/510", "link3": "", "link4": ""}, {"name": "Boulder Solar III", "city": "Clark County", "id": "109", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "232", "estimate_mwh": "", "power_mw": "58", "customer": "", "owner": "NV Energy", "developer": "174 PowerGlobal / KOMIPO", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.827801", "long": "-114.947397", "coords_hint": "0", "use_case": "128MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "", "link3": "", "link4": ""}, {"name": "Chuckwella", "city": "Clark County", "id": "110", "external_id": "64558", "state": "nevada", "country": "usa", "capacity_mwh": "720", "estimate_mwh": "", "power_mw": "180", "customer": "", "owner": "NV Energy", "developer": "EDF Renewables", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.501562", "long": "-114.818882", "coords_hint": "0", "use_case": "200 MW solar farm support", "notes": "", "project_website": "https://www.chuckwallasolarprojectseis.com/about-the-projects.html", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "", "link3": "", "link4": ""}, {"name": "Agua Fria / Bolster Substation", "city": "Glendale / Phoenix", "id": "111", "external_id": "141", "state": "arizona", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "Salt River Project (SRP)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "32", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.553691", "long": "-112.212654", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "link2": "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/", "link3": "", "link4": ""}, {"name": "Cascade", "city": "Stockton", "id": "112", "external_id": "61801", "state": "california", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "PG&E", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "SYL Battery (Risen Energy)", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-24", "start_construction": "", "start_operation": "", "start_estimated": "2022Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.921103", "long": "-121.24114", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://ceqanet.opr.ca.gov/2020090414/2", "link2": "https://www.energy-storage.news/broad-reach-power-orders-118mwh-ess-equipment-for-california-project-from-syl-battery/", "link3": "", "link4": ""}, {"name": "Cranberry Point", "city": "Carver", "id": "113", "external_id": "62844", "state": "massachusetts", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.896693", "long": "-70.786639", "coords_hint": "1", "use_case": "", "notes": "got the info about tesla as manufacturer from twitter thread and FAQ on the project website", "project_website": "https://cranberrypointenergystorage.com/", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, {"name": "Cross Town", "city": "Gorham", "id": "114", "external_id": "66606", "state": "maine", "country": "usa", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "175", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.68383", "long": "-70.39786", "coords_hint": "1", "use_case": "", "notes": "pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ** got the info about tesla from twitter thread as all plus power project seem to be tesla", "project_website": "https://www.crosstownenergystorage.com/about", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, {"name": "Bat Cave", "city": "Mason County", "id": "115", "external_id": "64312", "state": "texas", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-09-15", "start_operation": "", "start_estimated": "2021", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.7345278", "long": "-99.2311111", "coords_hint": "1", "use_case": "", "notes": "location verified from photo on broad reach power website", "project_website": "https://broadreachpower.com/projects/", "link1": "https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/", "link2": "", "link3": "", "link4": ""}, {"name": "North Fork", "city": "Williamson County", "id": "116", "external_id": "64317", "state": "texas", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-09-15", "start_operation": "", "start_estimated": "2021", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.655335", "long": "-97.883739", "coords_hint": "0", "use_case": "", "notes": "location from the broad reach power website, but do not think it is correct", "project_website": "https://broadreachpower.com/projects/", "link1": "https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/", "link2": "", "link3": "", "link4": ""}, {"name": "Coso", "city": "Coso Junction, Little Lake", "id": "117", "external_id": "63943", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "60", "customer": "", "owner": "Arevon", "developer": "Arevon", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.056513", "long": "-117.858611", "coords_hint": "0", "use_case": "", "notes": "took the location from arevon website, but on google maps satellite seems like an unlikely location, this project is most likely tesla given that arevon has signed a large deal with tesla", "project_website": "https://arevonenergy.com/location/coso/", "link1": "https://arevonenergy.com/arevon-signs-agreement-for-2-gw-6-gwh-of-tesla-megapack-systems/", "link2": "", "link3": "", "link4": ""}, {"name": "Mohammed bin Rashid Al Maktoum Solar Park", "city": "Dubai", "id": "118", "external_id": "", "state": "", "country": "uae", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "1", "customer": "", "owner": "Dubai Electricity and Water Authority (DEWA)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.765375", "long": "55.367443", "coords_hint": "0", "use_case": "1000MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "link2": "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/", "link3": "", "link4": ""}, {"name": "Bouldercombe", "city": "", "id": "119", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Genex Power", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "40", "status": "operation", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-23.537188", "long": "150.48991", "coords_hint": "3", "use_case": "", "notes": "used the date of the tweet as operation start date", "project_website": "https://www.genexpower.com.au/bouldercombe-battery-project.html", "link1": "https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "link2": "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "link3": "https://twitter.com/SawyerMerritt/status/1722857295078383700", "link4": ""}, {"name": "Poolbeg", "city": "Dublin", "id": "120", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "75", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.338696", "long": "-6.205066", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://blog.fluenceenergy.com/esb-fluence-complete-deal-largest-energy-storage-portfolio-europe", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Wall", "city": "Dublin", "id": "121", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "60", "estimate_mwh": "", "power_mw": "30", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.338662", "long": "-6.191852", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://blog.fluenceenergy.com/esb-fluence-complete-deal-largest-energy-storage-portfolio-europe", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aghada", "city": "Cork", "id": "122", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "38", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.833728", "long": "-8.237095", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.pv-magazine.com/2021/01/08/irish-esb-to-add-100-mwh-of-fluence-storage-to-its-portfolio/", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Inchicore", "city": "Dublin", "id": "123", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "60", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.335521", "long": "-6.336714", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.pv-magazine.com/2021/01/08/irish-esb-to-add-100-mwh-of-fluence-storage-to-its-portfolio/", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Xlinks (Morocco UK)", "city": "", "id": "124", "external_id": "", "state": "", "country": "morocco", "capacity_mwh": "20000", "estimate_mwh": "", "power_mw": "5000", "customer": "", "owner": "xlinks", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-04", "start_construction": "", "start_operation": "", "start_estimated": "2027", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "28.127867", "long": "-11.599926", "coords_hint": "0", "use_case": "7000MW solar farm support ** 3500MW wind farm support ** remote generation for UK (3800km HVDC cable)", "notes": "2021: this is early stage and not guaranteed to happened, but putting it there as it is a very ambitious project and more of those are needed ** construction to start in 2025, the first systems to go onine in 2027 ** PPA at 48 GBP / Mwh ** the youtube video is a great overview", "project_website": "https://xlinks.co/morocco-uk-power-project/", "link1": "https://www.greentechmedia.com/articles/read/xlinks-revives-desertecs-dream-with-a-few-twists", "link2": "https://www.youtube.com/watch?v=iJunxkln578", "link3": "", "link4": ""}, {"name": "Burwell", "city": "Burwell", "id": "125", "external_id": "7272", "state": "cambridgeshire", "country": "uk", "capacity_mwh": "56", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "SMS Plc", "manufacturer": "Trina Storage / CATL", "type": "", "cells": "CATL LFP", "no_of_battery_units": "157", "status": "construction", "date_first_heard": "2021-10-12", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.27859", "long": "0.316193", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/energy-storage-product-launches-in-europe-from-major-chinese-solar-companies-trina-sungrow/", "link2": "https://www.youtube.com/watch?v=PT1vRQdYuzE", "link3": "", "link4": ""}, {"name": "Clermont", "city": "Lindenhurst", "id": "126", "external_id": "64236", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.701265", "long": "-73.366732", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, {"name": "Intrepid", "city": "Oceanside", "id": "127", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "300", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.616803", "long": "-73.646401", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, {"name": "Swiftsure", "city": "Staten Island", "id": "128", "external_id": "64235", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "650", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.602891", "long": "-74.178441", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, {"name": "Chapel Farm", "city": "Luton", "id": "129", "external_id": "7058", "state": "bedfordshire", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Tag Energy", "developer": "Harmony Energy", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "51.925835", "long": "-0.49999903", "coords_hint": "0", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://twitter.com/Tesla_Megapack/status/1669479285848182784", "link3": "", "link4": ""}, {"name": "Jamesfield Farm", "city": "Abernethy", "id": "130", "external_id": "10863", "state": "fife", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "Tag Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "26", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://www.harmonyenergyplanning.co.uk/jamesfield/", "link3": "", "link4": ""}, {"name": "Scampitella", "city": "", "id": "131", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "72", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / fluence", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.082553", "long": "15.342974", "coords_hint": "1", "use_case": "", "notes": "fluence claims it is from them, but in the nidec pdf the also mention it, not quite sure...", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://blog.fluenceenergy.com/enel-x-taps-fluence-gridstack-storage-product-to-deliver-fast-reserve-services-in-italy", "link3": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link4": ""}, {"name": "Ginestra", "city": "", "id": "132", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / nidec", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.285189", "long": "15.072551", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link3": "https://www.ngk-insulators.com/en/product/nas-solutions.html", "link4": ""}, {"name": "Flumeri", "city": "", "id": "133", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / nidec", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.067966", "long": "15.123332", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link3": "", "link4": ""}, {"name": "Thailand (name tbd)", "city": "", "id": "134", "external_id": "", "state": "", "country": "thailand", "capacity_mwh": "136", "estimate_mwh": "", "power_mw": "45", "customer": "", "owner": "Super Energy", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "14.334678", "long": "100.052398", "coords_hint": "0", "use_case": "49MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/sungrow-is-supplier-to-thai-solar-plus-storage-project-featuring-southeast-asias-biggest-bess/", "link2": "", "link3": "", "link4": ""}, {"name": "Loy Yang", "city": "", "id": "135", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "AGL Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.254578", "long": "146.581076", "coords_hint": "0", "use_case": "at coal power plant", "notes": "", "project_website": "", "link1": "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-loy-yang-s-proposed-battery-receives-planning-approval", "link2": "", "link3": "", "link4": ""}, {"name": "Liddell", "city": "", "id": "136", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "AGL Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-32.371786", "long": "150.972683", "coords_hint": "0", "use_case": "at coal power plant", "notes": "could not find mwh info", "project_website": "", "link1": "https://www.pv-magazine-australia.com/2021/05/07/agl-pushes-ahead-with-renewable-energy-plans-for-liddell-site/", "link2": "", "link3": "", "link4": ""}, {"name": "Waikato (name tbd)", "city": "", "id": "137", "external_id": "", "state": "", "country": "new zealand", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "WEL Networks", "developer": "Infratec", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-10-18", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "17", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "-37.519913", "long": "175.054654", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/new-zealands-first-grid-scale-battery-storage-system-project-nears-start-of-construction/", "link2": "", "link3": "", "link4": ""}, {"name": "Hazelwood", "city": "LaTrobe Valley", "id": "138", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "Macquarie\u2019s Green Investment Group / Engie", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-12-01", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.271456", "long": "146.390309", "coords_hint": "0", "use_case": "at coal power plant", "notes": "will benefit from unused transmission capacity of old power plant", "project_website": "", "link1": "https://www.energy-storage.news/150mw-privately-funded-battery-project-is-latest-in-australia-to-repurpose-fossil-fuel-plant-site/", "link2": "", "link3": "", "link4": ""}, {"name": "Vilnius", "city": "", "id": "139", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "54.651925", "long": "25.240645", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, {"name": "Siauliai", "city": "", "id": "140", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "55.916586", "long": "23.307078", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, {"name": "Alytus", "city": "", "id": "141", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "54.405809", "long": "24.011371", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, {"name": "Utena", "city": "", "id": "142", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "55.505378", "long": "25.595541", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, {"name": "Searcy Solar Hybrid", "city": "", "id": "143", "external_id": "62617", "state": "arkansas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Searcy Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Red Antelope Solar & Energy Storage Farm", "city": "", "id": "144", "external_id": "64208", "state": "arizona", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "302PN 8me LLC", "developer": "8 minute", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.712788", "long": "-111.290085", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "", "project_website": "", "link1": "https://lakepowellchronicle.com/article/4000-acre-solar-project-proposed-near-page", "link2": "", "link3": "", "link4": ""}, {"name": "Atlas", "city": "", "id": "145", "external_id": "63798", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "El Sol BESS", "city": "", "id": "146", "external_id": "62964", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Foothills Solar Plant Hybrid", "city": "", "id": "147", "external_id": "57997", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "76", "power_mw": "38", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gila Bend Hybrid", "city": "", "id": "148", "external_id": "59020", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wilmot Energy Center LLC", "city": "", "id": "149", "external_id": "64426", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Wilmot Energy Center LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cotton Center Solar Hybrid", "city": "", "id": "151", "external_id": "57561", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paloma Solar Hybrid", "city": "", "id": "152", "external_id": "57562", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hyder Solar Hybrid", "city": "", "id": "153", "external_id": "57563", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "16", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hyder II Hybrid", "city": "", "id": "154", "external_id": "58383", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Star Hybrid", "city": "", "id": "155", "external_id": "62965", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Star Hybrid", "city": "", "id": "156", "external_id": "59444", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bellefield 2 Solar & Energy Storage Farm", "city": "", "id": "157", "external_id": "64209", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "26SB 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bellefield Solar and Energy Storage Farm", "city": "", "id": "158", "external_id": "64210", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "50LW 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kingsley Solar Farm", "city": "", "id": "159", "external_id": "64634", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "720", "power_mw": "360", "customer": "", "owner": "90FI 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aratina Solar Center 2", "city": "", "id": "161", "external_id": "64215", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "45MG 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Big Rock Solar Farm", "city": "", "id": "162", "external_id": "64636", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "92JT 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sienna Solar Farm", "city": "", "id": "163", "external_id": "64632", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "99MT 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eland Solar & Storage Center, Phase 2 Hybrid", "city": "", "id": "164", "external_id": "61169", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "69SV 8me LLC", "developer": "Arevon", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "150", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "35.198008", "long": "-117.994", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1760848348607594844", "link2": "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "link3": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link4": ""}, {"name": "Daggett 3", "city": "", "id": "165", "external_id": "64852", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "288", "power_mw": "144", "customer": "", "owner": "Daggett Solar Power 3 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arlington Energy Center II", "city": "", "id": "166", "external_id": "64481", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "132", "customer": "", "owner": "Arlington Energy Center II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Daggett 2", "city": "", "id": "167", "external_id": "64851", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "262", "power_mw": "131", "customer": "", "owner": "Daggett Solar Power 2 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fifth Standard Solar PV, LLC (Hybrid)", "city": "", "id": "168", "external_id": "64197", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "234", "power_mw": "117", "customer": "", "owner": "RWE Renewables Americas LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Resurgence Solar", "city": "", "id": "169", "external_id": "64489", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "230", "power_mw": "115", "customer": "", "owner": "Resurgence Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Luna Storage", "city": "", "id": "170", "external_id": "63685", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Luna Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sanborn BESS 1", "city": "", "id": "171", "external_id": "64712", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sanborn BESS 2", "city": "", "id": "172", "external_id": "64713", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Noosa Energy Storage LLC", "city": "", "id": "173", "external_id": "64531", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Noosa Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "JVR Energy Park LLC", "city": "", "id": "174", "external_id": "64428", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "JVR Energy Park LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blythe Solar 110, LLC", "city": "", "id": "175", "external_id": "60093", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "63", "customer": "", "owner": "Blythe Solar 110, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cal Flats BESS", "city": "", "id": "176", "external_id": "63930", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "CD Arevon USA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Slate Hybrid", "city": "", "id": "177", "external_id": "63727", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "RE Slate 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aratina Solar Center 1 Hybrid", "city": "", "id": "178", "external_id": "61167", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "91MC 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maverick Solar 6, LLC", "city": "", "id": "179", "external_id": "64105", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Maverick Solar 6, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hudson - High Desert Hybrid", "city": "", "id": "180", "external_id": "64624", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Goldman Sachs Renewable Power Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arlington Energy Center III", "city": "", "id": "181", "external_id": "64564", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "94", "power_mw": "47", "customer": "", "owner": "Arlington Energy Center III", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Painter Energy Storage", "city": "", "id": "182", "external_id": "62729", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Painter Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fallbrook Energy Storage", "city": "", "id": "183", "external_id": "61365", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "city": "", "id": "184", "external_id": "62892", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "EDPR CA Solar Park VI LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dynegy Oakland Power Plant", "city": "", "id": "185", "external_id": "6211", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72.6", "power_mw": "36.3", "customer": "", "owner": "Dynegy Oakland, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E1A", "city": "", "id": "186", "external_id": "64878", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Harvest II LLC", "city": "", "id": "187", "external_id": "64103", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "35", "customer": "", "owner": "Desert Harvest II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E2", "city": "", "id": "188", "external_id": "64879", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Top Gun Energy Storage", "city": "", "id": "189", "external_id": "61366", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Johanna Energy Center, LLC", "city": "", "id": "190", "external_id": "63843", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Renz Energy Storage", "city": "", "id": "191", "external_id": "63529", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Pacific Gas & Electric Co.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E3 ", "city": "", "id": "192", "external_id": "64877", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Silverstrand Grid Energy Storage System", "city": "", "id": "193", "external_id": "63735", "state": "california", "country": "usa", "capacity_mwh": "46", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Silverstrand Grid, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.205195", "long": "-119.058256", "coords_hint": "3", "use_case": "", "notes": "Using 3.1MWh to get from the packs to capacity", "project_website": "", "link1": "https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/", "link2": "", "link3": "", "link4": ""}, {"name": "Camino Solar", "city": "", "id": "194", "external_id": "63508", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Avangrid Renewables LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stanton Energy Reliability Center Hybrid", "city": "", "id": "195", "external_id": "60698", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Wellhead Energy, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Henrietta D Energy Storage LLC", "city": "", "id": "196", "external_id": "60641", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Convergent Energy and Power LP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Energy Johanna Facility", "city": "", "id": "197", "external_id": "62889", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Goleta Grid Resiliency", "city": "", "id": "198", "external_id": "63736", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "esVolta LP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chevron - Lost Hills Hybrid", "city": "", "id": "199", "external_id": "63545", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Goldman Sachs Renewable Power Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sierra Energy Storage, LLC", "city": "", "id": "200", "external_id": "61803", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Enel Green Power NA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sierra", "city": "", "id": "201", "external_id": "64320", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kearny North Energy Storage", "city": "", "id": "202", "external_id": "64612", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kearny South Energy Storage", "city": "", "id": "203", "external_id": "64614", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Neptune Energy Center Hybrid", "city": "", "id": "204", "external_id": "63731", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "Neptune Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thunder Wolf Energy Center Hybrid", "city": "", "id": "205", "external_id": "63776", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Thunder Wolf Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pike Solar Hybrid", "city": "", "id": "206", "external_id": "64212", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Pike Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pure Hedge LLC", "city": "", "id": "207", "external_id": "50736", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Pure Hedge LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trenton", "city": "", "id": "208", "external_id": "63995", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Duke Energy Florida, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cool Springs Solar (Hybrid)", "city": "", "id": "209", "external_id": "63721", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Cool Springs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kupehau", "city": "", "id": "210", "external_id": "63799", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES Maui Kuihelani Solar Hybrid", "city": "", "id": "211", "external_id": "64256", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ho'Ohana Solar 1", "city": "", "id": "212", "external_id": "63723", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "104", "power_mw": "52", "customer": "", "owner": "Ho'Ohana Solar 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES Waikoloa Solar Hybrid", "city": "", "id": "213", "external_id": "63900", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hale Kuawehi Solar Hybrid", "city": "", "id": "214", "external_id": "62529", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Hale Kuawehi Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kahana Solar, LLC", "city": "", "id": "215", "external_id": "64095", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Kahana Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paeahu Solar Hybrid", "city": "", "id": "216", "external_id": "62534", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Paeahu Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barbers Point Solar, LLC", "city": "", "id": "217", "external_id": "64094", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Barbers Point Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES Kekaha Solar, LLC Hybrid", "city": "", "id": "218", "external_id": "63280", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES West Oahu Solar Hybrid", "city": "", "id": "219", "external_id": "64656", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "12.5", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Outer Cape Community Battery", "city": "", "id": "220", "external_id": "62604", "state": "massachusetts", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Eversource", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Portland ESS, LLC", "city": "", "id": "221", "external_id": "64616", "state": "maine", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "South Portland ESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "OE_MS5", "city": "", "id": "222", "external_id": "64529", "state": "mississippi", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "OE_MS5", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Haymaker Hybrid", "city": "", "id": "223", "external_id": "63878", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Haymaker Energy Project LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grissom Solar, LLC", "city": "", "id": "224", "external_id": "64450", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Grissom Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rockmont Solar and Storage Project", "city": "", "id": "225", "external_id": "64216", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "201LC 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Taos Mesa Energy Facility Hybrid", "city": "", "id": "226", "external_id": "63728", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Taos Mesa Energy Facility, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Southern Bighorn Solar Hybrid", "city": "", "id": "227", "external_id": "63113", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "300MS 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Townsite Solar Project Hybrid", "city": "", "id": "228", "external_id": "60654", "state": "nevada", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "180", "power_mw": "90", "customer": "Arevon", "owner": "Townsite Solar, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.935805", "long": "-114.869386", "coords_hint": "1", "use_case": "190MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesla.com/videos/townsite-solar-storage", "link2": "https://arevonenergy.com/location/townsite/", "link3": "", "link4": ""}, {"name": "Arrow Canyon Solar Hybrid", "city": "", "id": "229", "external_id": "62248", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Arrow Canyon Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dodge Flat", "city": "", "id": "230", "external_id": "63913", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Dodge Flat Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fish Springs", "city": "", "id": "231", "external_id": "64148", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Fish Springs Ranch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Battle Mountain Solar Project", "city": "", "id": "232", "external_id": "61098", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "NISA Electric Generation Project", "city": "", "id": "233", "external_id": "61331", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "NYC ENERGY LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "NY2 Battery", "city": "", "id": "234", "external_id": "63584", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Willis Battery Storage", "city": "", "id": "235", "external_id": "63238", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "New York Power Authority", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Orangeville Storage", "city": "", "id": "236", "external_id": "64686", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Skeleton Creek Energy Center Hybrid", "city": "", "id": "237", "external_id": "62494", "state": "oklahoma", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Skeleton Creek Energy Center", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rush Springs Energy Storage (BA)", "city": "", "id": "238", "external_id": "63458", "state": "oklahoma", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Rush Springs Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-03-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wheatridge Hybrid", "city": "", "id": "239", "external_id": "62745", "state": "oregon", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Wheatridge Wind Holdings, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vonore Battery Energy Storage System", "city": "", "id": "240", "external_id": "64255", "state": "tennessee", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Tennessee Valley Authority", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blue Jay Solar I, LLC", "city": "", "id": "241", "external_id": "64672", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "420", "power_mw": "210", "customer": "", "owner": "Blue Jay Solar I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Azure Sky Wind Project, LLC Hybrid", "city": "", "id": "242", "external_id": "64164", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "120", "customer": "", "owner": "Azure Sky Wind Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chisholm Grid Energy Storage System", "city": "", "id": "243", "external_id": "63737", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Chisholm Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Madero Grid", "city": "", "id": "244", "external_id": "63757", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Madero Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX17 Nickel Prairie Storage", "city": "", "id": "245", "external_id": "63880", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX18 Cottage Meadow Storage", "city": "", "id": "246", "external_id": "63879", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ignacio Grid Energy Storage System", "city": "", "id": "247", "external_id": "64089", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Ignacio Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Forest Grove - Dodd", "city": "", "id": "248", "external_id": "64131", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Renewable Energy Ventures LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Azure Sky Solar", "city": "", "id": "249", "external_id": "63905", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "154", "power_mw": "77", "customer": "", "owner": "Azure Sky Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ranchland Wind Storage", "city": "", "id": "250", "external_id": "64545", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "146", "power_mw": "73", "customer": "", "owner": "Ranchland Wind Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lily Solar Hybrid", "city": "", "id": "251", "external_id": "63892", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Lily Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TREX US Red Holly", "city": "", "id": "252", "external_id": "63202", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "TREX US Red Holly LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "High Lonesome Wind Power, LLC Hybrid", "city": "", "id": "253", "external_id": "62562", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "High Lonesome Wind Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roadrunner, LLC Hybrid", "city": "", "id": "254", "external_id": "62561", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Roadrunner Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Darien Solar", "city": "", "id": "255", "external_id": "64534", "state": "wisconsin", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Wisconsin Electric Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Omburu", "city": "erongo region", "id": "256", "external_id": "", "state": "", "country": "namibia", "capacity_mwh": "72", "estimate_mwh": "", "power_mw": "58", "customer": "", "owner": "NamPower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-21.495675", "long": "16.026467", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/e20m-grant-funding-for-namibias-first-grid-scale-bess-from-germanys-national-development-bank/", "link2": "", "link3": "", "link4": ""}, {"name": "Buffalo", "city": "", "id": "257", "external_id": "", "state": "", "country": "netherlands", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "GIGA Storage", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "LFP", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.985216", "long": "5.665107", "coords_hint": "2", "use_case": "", "notes": "storage will be rented out to Eneco, STAAS: storage as a service", "project_website": "", "link1": "https://www.energy-storage.news/wartsilas-48mwh-netherlands-bess-will-be-europes-first-large-scale-lfp-battery-project/", "link2": "", "link3": "", "link4": ""}, {"name": "Dunkirk 2", "city": "Dunkirk", "id": "258", "external_id": "", "state": "", "country": "france", "capacity_mwh": "31", "estimate_mwh": "", "power_mw": "31", "customer": "", "owner": "Total", "developer": "", "manufacturer": "Saft", "type": "Intensium Max 20 High Energy (20ft container)", "cells": "NMC", "no_of_battery_units": "16", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.030471", "long": "2.255373", "coords_hint": "2", "use_case": "", "notes": "saft is owned by total", "project_website": "", "link1": "https://www.energy-storage.news/frances-largest-battery-storage-facility-expanded-to-61mw-61mwh-as-second-phase-completed/", "link2": "", "link3": "", "link4": ""}, {"name": "AES Kilroot Station Battery Storage Array", "city": "", "id": "259", "external_id": "6845", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "AES Kilroot Power (AES KPL)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2015-11-18", "start_operation": "2016-01-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pelham", "city": "", "id": "260", "external_id": "6898", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy/ InfraRed Capital", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-18", "start_construction": "2017-01-15", "start_operation": "2017-06-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackburn Meadows ", "city": "", "id": "261", "external_id": "6906", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "E.ON UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-04-07", "start_operation": "2017-10-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Broxburn ", "city": "", "id": "262", "external_id": "6910", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-06", "start_construction": "2017-08-15", "start_operation": "2018-09-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land to the west of Clay Hill Pit / Larport Farm", "city": "", "id": "263", "external_id": "6911", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Anesco (formerly owned by Energy Reservoirs)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-11-18", "start_construction": "2019-01-01", "start_operation": "2020-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roosecote", "city": "", "id": "264", "external_id": "6912", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Centrica", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-03-01", "start_operation": "2018-11-30", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hill Farm - Energy Barn", "city": "", "id": "265", "external_id": "6915", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-08-17", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kings Barn Farm - Energy Barn", "city": "", "id": "266", "external_id": "6916", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-04", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Leverton Farm - Energy Barn", "city": "", "id": "267", "external_id": "6917", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Eelpower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-11-01", "start_operation": "2018-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Noriker Power Staunch", "city": "", "id": "268", "external_id": "6918", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Hazel Capital/ Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-05-19", "start_construction": "2016-12-15", "start_operation": "2017-03-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Burton", "city": "", "id": "269", "external_id": "6920", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-09-30", "start_construction": "2018-01-25", "start_operation": "2018-06-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tynemouth Energy Storage System (TESS)", "city": "", "id": "270", "external_id": "6925", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Enel (formerly Element Power)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-12", "start_construction": "2018-12-20", "start_operation": "2018-05-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Nevendon", "city": "", "id": "271", "external_id": "6926", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Belectric UK / Foresight", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2018-10-15", "start_operation": "2018-03-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pen y Cymoedd Energy Storage", "city": "", "id": "272", "external_id": "6927", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Vattenfall", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-11-01", "start_operation": "2018-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chelveston Renewable Energy Park", "city": "", "id": "273", "external_id": "6941", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Federal Estates", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-06-15", "start_construction": "2019-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Claredown Farm", "city": "", "id": "274", "external_id": "6945", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Zenobe (formerly Energy Reservoir 15)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-06-05", "start_construction": "2017-09-01", "start_operation": "2018-02-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Breach Farm - Energy Barn", "city": "", "id": "275", "external_id": "6914", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norton", "city": "", "id": "276", "external_id": "6923", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy/ InfraRed Capital", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Traston Road", "city": "", "id": "277", "external_id": "6929", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bristol Road", "city": "", "id": "278", "external_id": "6930", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-10-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Asfordby Business Park (1)", "city": "", "id": "279", "external_id": "6932", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "23", "power_mw": "23", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lockleaze Energy Storage", "city": "", "id": "280", "external_id": "6961", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Aura Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-05-05", "start_construction": "2017-06-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tofts Lane", "city": "", "id": "281", "external_id": "6942", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Enstor Power UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Port of Tyne", "city": "", "id": "282", "external_id": "6976", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Foresight", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2018-04-01", "start_operation": "2018-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ray Battery Storage Facility", "city": "", "id": "283", "external_id": "6943", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Vattenfall Wind Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pikelaw Place", "city": "", "id": "284", "external_id": "6944", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Hollies", "city": "", "id": "285", "external_id": "6946", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "24", "customer": "", "owner": "Spencer Farm Produce", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Minety North", "city": "", "id": "286", "external_id": "6952", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy / Minety North Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Melksham Substation East Storage", "city": "", "id": "287", "external_id": "6953", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy / Melksham East Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Slamseys Energy Storage", "city": "", "id": "288", "external_id": "7000", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Gridserve Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-10-26", "start_construction": "2020-01-13", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Melksham Substation West Storage", "city": "", "id": "289", "external_id": "6955", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy / Melksham West Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norwich Road Industrial Estate", "city": "", "id": "290", "external_id": "6958", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land off Queenborough Road", "city": "", "id": "291", "external_id": "7003", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-10-30", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wolverhampton West Sub Station", "city": "", "id": "292", "external_id": "6977", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Former Rugeley Power Station", "city": "", "id": "293", "external_id": "6981", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "ENGIE Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-08-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aikengall II Community Wind Farm Battery", "city": "", "id": "294", "external_id": "7015", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Community Wind Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rayleigh Transforming Station", "city": "", "id": "295", "external_id": "6984", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Aura Power / South East Grid Storage Two", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bilbo Solar Farm Energy Storage ", "city": "", "id": "296", "external_id": "7020", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Energy International", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-09-20", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stony Energy Storage Facility", "city": "", "id": "297", "external_id": "7001", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roaring Hill Energy Storage Facility", "city": "", "id": "298", "external_id": "7002", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pillswood Phase 1", "city": "Cottingham", "id": "299", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": ""}, {"name": "Aven Industrial Estate", "city": "", "id": "300", "external_id": "7007", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Max Design Consultancy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Litchlake Farm", "city": "", "id": "301", "external_id": "7011", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hall Farm Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ravensroost Farm", "city": "", "id": "302", "external_id": "7014", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Arlington Energy (formerly Enso Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-10-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drax Re-Power", "city": "", "id": "303", "external_id": "7017", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Drax Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "STOR Field 9", "city": "", "id": "304", "external_id": "7018", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "37", "power_mw": "37", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Nether Moor Field", "city": "", "id": "305", "external_id": "7019", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Thurcroft Energy (Max Design Consultancy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norwich Substation Storage Facility", "city": "", "id": "306", "external_id": "7021", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mannington Battery Storage Plant", "city": "", "id": "307", "external_id": "7024", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Public Power Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Charleywood Road, Knowsley Industrial Park", "city": "", "id": "308", "external_id": "7026", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Immersa / Kirkby Battery Storage 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Enderby Storage, Redcomb Farm", "city": "", "id": "309", "external_id": "7044", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy / Enderby Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-20", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Middleton Clean Energy Plant", "city": "", "id": "310", "external_id": "7029", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Lancaster Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Portadown Road", "city": "", "id": "311", "external_id": "7047", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon Storage Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-09-21", "start_construction": "2020-01-15", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dungannon Energy Storage System", "city": "", "id": "312", "external_id": "7050", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon Storage Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-10-08", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Leighton Hall Farm", "city": "", "id": "313", "external_id": "7032", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Energy Demand and Response", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Manton Wood", "city": "", "id": "314", "external_id": "7035", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Lark Gas Assets", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Riverside Energy Park", "city": "", "id": "315", "external_id": "7036", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Cory Riverside Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Salt End Lane", "city": "", "id": "316", "external_id": "7039", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "AMPY Energy Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fraserburgh Development", "city": "", "id": "317", "external_id": "7041", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land To The East Of Wholeflats Road (Grangemouth)", "city": "", "id": "318", "external_id": "7043", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Enstor (formerly CJ Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-07-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tilbury Energy Centre", "city": "", "id": "319", "external_id": "7048", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "RWE Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ellbridge Lane", "city": "", "id": "320", "external_id": "7051", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-08-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elland Storage Project", "city": "", "id": "321", "external_id": "7053", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land at Derwenthaugh Eco Park", "city": "", "id": "322", "external_id": "7054", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Derwenthaugh", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Strichen South", "city": "", "id": "323", "external_id": "7056", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Perseverance Road", "city": "", "id": "325", "external_id": "7061", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cottam Power Station", "city": "", "id": "326", "external_id": "7066", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gloucestershire Science and Technology Park", "city": "", "id": "327", "external_id": "7067", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hadham Road", "city": "", "id": "328", "external_id": "7068", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kilshaw Street", "city": "", "id": "329", "external_id": "7072", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Riverford Farm", "city": "", "id": "330", "external_id": "7078", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Abham Storage / Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sundridge Hill", "city": "", "id": "331", "external_id": "7081", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Severn Road", "city": "", "id": "332", "external_id": "7085", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "FPC Industry & Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Callywhite Lane Commercial Estate", "city": "", "id": "333", "external_id": "7087", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land Adjacent to 4 Redcote Lane (Armley)", "city": "", "id": "334", "external_id": "7111", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Enstor (formerly CJ Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-06-07", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dollymans Storage", "city": "", "id": "335", "external_id": "7088", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Statera Energy / Dollymans Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grendon Storage", "city": "", "id": "336", "external_id": "7089", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy / Grendon Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maldon Hall", "city": "", "id": "337", "external_id": "7095", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Creyke Beck", "city": "", "id": "338", "external_id": "7122", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-06-15", "start_construction": "2018-03-01", "start_operation": "2018-11-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rubber and Allied Products", "city": "", "id": "339", "external_id": "7096", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stockbridge Road", "city": "", "id": "340", "external_id": "7097", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Winchester Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Huggin's Hall", "city": "", "id": "341", "external_id": "7129", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Low Carbon", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2017-08-13", "start_operation": "2018-02-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Kirkby Business Park", "city": "", "id": "342", "external_id": "7109", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Morris & co Handling", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fideoak Mills", "city": "", "id": "343", "external_id": "7152", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Kiwi Power (formerly Taunton Battery Storage)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-02-23", "start_construction": "2019-09-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penwortham Sub Station", "city": "", "id": "344", "external_id": "7119", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land at Carnegie Road", "city": "", "id": "345", "external_id": "7155", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "\ufffdrsted", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-12-15", "start_construction": "2018-10-24", "start_operation": "2018-12-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaufort Road", "city": "", "id": "346", "external_id": "7128", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-11-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land North of Thornton Road", "city": "", "id": "347", "external_id": "7131", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "South Redhouse", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "North West Of Jameston Farm", "city": "", "id": "348", "external_id": "7133", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land SW of Shilton Cottage", "city": "", "id": "349", "external_id": "7134", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Muirhall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-10-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Calow Green Farm", "city": "", "id": "350", "external_id": "7140", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy (formerly Enso Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land Adj Harmer Warren Quarry", "city": "", "id": "351", "external_id": "7143", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "New Forest Energy (formerly Somerley Estate)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Resubmission", "city": "", "id": "352", "external_id": "7149", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Taunton Substation ", "city": "", "id": "353", "external_id": "7153", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cleator", "city": "", "id": "354", "external_id": "7177", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Low Carbon Storage Investment Company/ VLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-08-08", "start_operation": "2018-01-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greenburn Wind Park", "city": "", "id": "355", "external_id": "7159", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Energy Consents And Deployment Unit", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Braintree Road Substation", "city": "", "id": "356", "external_id": "7161", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-01-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drumfad Wood", "city": "", "id": "357", "external_id": "7165", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Osbaldwick Substation", "city": "", "id": "358", "external_id": "7172", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-02-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitelee Wind Farm Battery Storage Extension", "city": "", "id": "359", "external_id": "7174", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Old Green Farm, Alveston Battery Storage", "city": "", "id": "360", "external_id": "7182", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Leechpool Farm, Norrington Battery Storage", "city": "", "id": "361", "external_id": "7183", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-08-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Minety South Battery Storage", "city": "", "id": "362", "external_id": "7184", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Didsbury Battery Storage", "city": "", "id": "363", "external_id": "7185", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wentlooge Renewable Energy Hub", "city": "", "id": "364", "external_id": "7192", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "62", "power_mw": "62", "customer": "", "owner": "Wentlooge Farmers' Solar Scheme", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Classic Marble Showers Site", "city": "", "id": "365", "external_id": "7208", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "48", "customer": "", "owner": "Engie Developments Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pleasance Road", "city": "", "id": "366", "external_id": "7217", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Coronation Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackpark Farm ", "city": "", "id": "367", "external_id": "7226", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Shires Hamilton ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land North of Actrees Solar Farm", "city": "", "id": "368", "external_id": "7230", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sundon Substation", "city": "", "id": "370", "external_id": "7283", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Boscar Grange Farm", "city": "", "id": "371", "external_id": "7332", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "27", "power_mw": "27", "customer": "", "owner": "Gridserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-11-29", "start_construction": "2019-05-23", "start_operation": "2019-12-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Jamesfield Organic Centre", "city": "Abernethy", "id": "373", "external_id": "7315", "state": "fife", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 130", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Troston Loch Wind Farm", "city": "", "id": "374", "external_id": "7333", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tollgate Farm Battery Storage (Resubmission)", "city": "", "id": "375", "external_id": "7335", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Snarlton Farm", "city": "", "id": "377", "external_id": "7380", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Plot 2B EurolinkV", "city": "", "id": "378", "external_id": "7383", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Trenport Investments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aurora Solar Farm", "city": "", "id": "379", "external_id": "7385", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "Low Carbon UK Solar Investment Company", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Harestanes Windfarm", "city": "", "id": "380", "external_id": "7395", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carnegie Road (Phase 2)", "city": "", "id": "381", "external_id": "7403", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Shawton Engineering", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trevol Business Park", "city": "", "id": "382", "external_id": "7404", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Londonwide Properties", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lascar Works ", "city": "", "id": "383", "external_id": "7464", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-03-26", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Douglas West Wind Farm (extension)", "city": "", "id": "384", "external_id": "7460", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Douglas West Extension / 3R Energy Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Harker Grid Sub Station", "city": "", "id": "385", "external_id": "7462", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bramford Substation", "city": "", "id": "386", "external_id": "7479", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brook Farm", "city": "", "id": "387", "external_id": "7498", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Low Carbon", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Salisbury Substation", "city": "Salisbury", "id": "388", "external_id": "7510", "state": "wiltshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49.5", "customer": "", "owner": "SSE", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "Harmony sold in 2021", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lackenby (Resubmission)", "city": "", "id": "389", "external_id": "7518", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greenfield Road", "city": "", "id": "390", "external_id": "7570", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Arlington Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-03-23", "start_construction": "2019-06-19", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cowley electricity sub-station", "city": "", "id": "391", "external_id": "7571", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lisnabreeny Road", "city": "", "id": "392", "external_id": "7556", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Energia Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hagshaw Hill", "city": "", "id": "393", "external_id": "7572", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-02-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shindour Feddal Hill Wood Braco", "city": "", "id": "394", "external_id": "7573", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Orchardbank Industrial Estate", "city": "", "id": "395", "external_id": "7574", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ardoch Farm", "city": "", "id": "396", "external_id": "7575", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bradford West Substation (Harrop Edge Farm Resubmission)", "city": "", "id": "397", "external_id": "7577", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dunsinane Industrial Estate", "city": "", "id": "398", "external_id": "7591", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Crown Farm", "city": "", "id": "399", "external_id": "7606", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gipsy Lane", "city": "", "id": "400", "external_id": "7632", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-03-20", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Model Farm", "city": "", "id": "401", "external_id": "7609", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Flower Farm", "city": "", "id": "402", "external_id": "7614", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Energy Centre Royal Mint", "city": "", "id": "403", "external_id": "7684", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Infinite Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-12-09", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holes Bay", "city": "Poole", "id": "404", "external_id": "7688", "state": "dorset", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 17", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Feeder Road", "city": "", "id": "405", "external_id": "7663", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Thrive Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Ballochy", "city": "", "id": "406", "external_id": "7675", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thurrock Flexible Generation Plant", "city": "", "id": "407", "external_id": "7696", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "RPS Group / Thurrock Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lister Drive", "city": "", "id": "408", "external_id": "7740", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Arenko Cleantech", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-03-13", "start_construction": "2021-05-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Churchtown Solar Farm Battery Storage", "city": "", "id": "409", "external_id": "7726", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rye Common", "city": "Farnham", "id": "410", "external_id": "7737", "state": "hampshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.25011", "long": "-0.87423", "coords_hint": "1", "use_case": "", "notes": "Phase II is 200m north-east of Phase I", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "link4": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"}, {"name": "Basing Road", "city": "", "id": "411", "external_id": "7746", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Eco-Economix", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stonehill Energy Storage", "city": "", "id": "412", "external_id": "7773", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-02-24", "start_construction": "2021-06-09", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordtown Energy Storage (Resubmission)", "city": "", "id": "413", "external_id": "7764", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Intelligent Land Investments (ILI)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Liverpool Energy Management Facility", "city": "", "id": "414", "external_id": "7772", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statkraft UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newton Wood Farm", "city": "", "id": "415", "external_id": "7780", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hawthorne Road", "city": "", "id": "416", "external_id": "7800", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Shaw Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clauchrie Windfarm Battery", "city": "", "id": "417", "external_id": "7804", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Manor Farm", "city": "", "id": "418", "external_id": "7820", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "26", "customer": "", "owner": "Coriolis Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-06-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mauxhall Farm", "city": "", "id": "419", "external_id": "7827", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "24", "customer": "", "owner": "ENGIE Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Titchfield Lane", "city": "", "id": "420", "external_id": "7828", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Balanced Grid Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cleve Hill Solar Project", "city": "", "id": "421", "external_id": "7856", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arecleoch Wind Farm (extension)", "city": "", "id": "422", "external_id": "7882", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coventry National Grid Substation", "city": "", "id": "423", "external_id": "7885", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dundee Technology Park", "city": "", "id": "424", "external_id": "7946", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-09", "start_construction": "", "start_operation": "2021-06-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Reach Road", "city": "", "id": "425", "external_id": "7906", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Power Networks", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bustleholme Substation", "city": "", "id": "426", "external_id": "7907", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Minety Substation", "city": "", "id": "427", "external_id": "7942", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Project", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Unit 5 XL Business Park", "city": "", "id": "428", "external_id": "7985", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Amber Infrastructure Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-18", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Perserverance Road (Resubmission)", "city": "", "id": "429", "external_id": "7966", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Learielaw Farm", "city": "", "id": "430", "external_id": "7970", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Intelligent Land Investments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Park Farm", "city": "", "id": "431", "external_id": "7983", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Eco-Economix", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-05-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mucklow Hill", "city": "", "id": "432", "external_id": "7984", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Britannia House", "city": "", "id": "433", "external_id": "7986", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Peel Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitehouse Farm Energy Barn", "city": "", "id": "434", "external_id": "7987", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Hedge", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Catsbrain Farm", "city": "", "id": "435", "external_id": "7988", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Hedge", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roaring Hill (Resubmission)", "city": "", "id": "436", "external_id": "7989", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mill Hill National Grid Substation", "city": "", "id": "437", "external_id": "8009", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grid Minety Substation", "city": "", "id": "438", "external_id": "8021", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Colinglen Road Battery", "city": "", "id": "439", "external_id": "8033", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Hannahstown BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grid Axminster Substation", "city": "", "id": "440", "external_id": "8036", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grid Enderby Substation", "city": "", "id": "441", "external_id": "8037", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Moston Vale", "city": "", "id": "442", "external_id": "8085", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Novus Renewable Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-11-24", "start_construction": "2021-07-31", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Welkin Mill", "city": "", "id": "443", "external_id": "8055", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Loudwater Battery Storage Site", "city": "", "id": "444", "external_id": "8142", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-05-24", "start_construction": "2021-06-10", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Torrdhuin, Auchteraw Battery Storage Facility", "city": "", "id": "445", "external_id": "8096", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SHB Hire Ltd", "city": "", "id": "446", "external_id": "8099", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Gerard Hall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bloxwich Battery", "city": "", "id": "447", "external_id": "8160", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "41", "power_mw": "41", "customer": "", "owner": "Gresham House Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-04-01", "start_operation": "2019-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackpark Energy Storage (Resubmission)", "city": "", "id": "448", "external_id": "8105", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Shires Hamilton", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drumcross Battery Storage", "city": "", "id": "449", "external_id": "8155", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Muirhall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Richborough Energy Park", "city": "", "id": "450", "external_id": "8195", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Richborough Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lower Dunton Road Battery Storage Facility", "city": "", "id": "451", "external_id": "8213", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Cedar Tech Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Three Bridges Solar Farm", "city": "", "id": "452", "external_id": "8220", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Platchaig House, Kilmorack - Battery Storage Facility", "city": "", "id": "453", "external_id": "8248", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brentwood nergy Storage System", "city": "", "id": "454", "external_id": "8249", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newlands Farm Battery Storage Facility Phase 2", "city": "", "id": "455", "external_id": "8264", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lakeside Energy Storage Facility", "city": "", "id": "456", "external_id": "8268", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Renewable Energy System Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Guildford Road Battery Storage Facility", "city": "", "id": "457", "external_id": "8269", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gerrards Cross Sewage Treatment Works", "city": "", "id": "458", "external_id": "8271", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Peak Gen Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cottom Power Station", "city": "", "id": "459", "external_id": "8278", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Thermal Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Capenhurst Lane", "city": "", "id": "460", "external_id": "8283", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Native River Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Park Farm, Herongate Solar Photovoltaic PV Farm", "city": "", "id": "461", "external_id": "8358", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Old Gallows Road - Battery storage", "city": "", "id": "462", "external_id": "8368", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Farburn Place - Energy Storage Facility", "city": "", "id": "463", "external_id": "8385", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Peak Reserve Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane Battery Storage", "city": "", "id": "464", "external_id": "8430", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Walker & Son (Hauliers) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Minchens Lane Battery Storage Facility", "city": "", "id": "465", "external_id": "8434", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grids Rainhill Substation Battery storage facility", "city": "", "id": "466", "external_id": "8439", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Sizing John Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trondheim Way Battery energy storage", "city": "", "id": "467", "external_id": "8455", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Burns Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Doverdale - Solar Farm & Battery Storage", "city": "", "id": "468", "external_id": "8529", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bristol Avenue - Battery Energy Storage Facility", "city": "", "id": "469", "external_id": "8809", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Henco International Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Howick Hall Farm - Battery Storage Facility", "city": "", "id": "470", "external_id": "8829", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Penwortham Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holt Road - Battery Energy Storage System", "city": "", "id": "471", "external_id": "8833", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Mannington Energy Centre Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bolfornought Farm Battery Storage Facility", "city": "", "id": "472", "external_id": "8912", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Skelton Battery Storage Facility", "city": "", "id": "473", "external_id": "8914", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Skelton Peak Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitehills Energy Storage Facility", "city": "", "id": "474", "external_id": "8916", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dersalloch Battery Storage Facility", "city": "", "id": "475", "external_id": "8927", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables (UK) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bolney Substation - Battery Storage", "city": "", "id": "476", "external_id": "8986", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stor Generation Plant - Battery Storage", "city": "", "id": "477", "external_id": "8998", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hull East Stor Generation Compound - Battery energy storage", "city": "", "id": "478", "external_id": "9006", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kilgallioch - Battery energy storage", "city": "", "id": "479", "external_id": "9007", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Scottish Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Standby Embedded Stor Power Plant - Battery storage", "city": "", "id": "480", "external_id": "9010", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greens Farm - Battery energy storage", "city": "", "id": "481", "external_id": "9012", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelham Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maiden, Annfield Plain - Energy Storage", "city": "", "id": "482", "external_id": "9036", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "38", "power_mw": "38", "customer": "", "owner": "Stephenson Mohl Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "city": "", "id": "483", "external_id": "9046", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Power Initiatives Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "city": "", "id": "484", "external_id": "9052", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whaddon Lane, Hilperton", "city": "", "id": "485", "external_id": "9057", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "INRG", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Purlieus Farm, Minety - Battery Storage Facility", "city": "", "id": "486", "external_id": "9063", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Minety South 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dragonhall Farm, Padanaram - Battery Storage", "city": "", "id": "487", "external_id": "9066", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecosse Solar Parks Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "488", "external_id": "9115", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "SSE Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rusholme Grange Resubmission", "city": "Selby", "id": "489", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "70", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.73122", "long": "-0.94159", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00", "link3": "", "link4": ""}, {"name": "Daer Wind Farm", "city": "", "id": "490", "external_id": "9127", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "E.ON Climate & Renewables UK Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bay Gateway - Battery Storage Facility", "city": "", "id": "491", "external_id": "9199", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "city": "", "id": "492", "external_id": "9224", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Forest Gate - Solar Farm & Battery Storage", "city": "", "id": "493", "external_id": "9230", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Leigh Delamere - Solar farm & Battery storage", "city": "", "id": "494", "external_id": "9238", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Fambridge Hall - Solar farm & Battery storage", "city": "", "id": "495", "external_id": "9274", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Weirs Drove, Burwell - Battery Storage Facility", "city": "", "id": "496", "external_id": "9292", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Fen Power 1 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sundon Substation - 49.9MW Battery Storage", "city": "", "id": "497", "external_id": "9315", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "city": "", "id": "498", "external_id": "9340", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "P3P Partners LLP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grendon Lakes - Battery Storage", "city": "", "id": "499", "external_id": "9341", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maelor Gasworks - Solar Farm & Battery Storage", "city": "", "id": "500", "external_id": "9343", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "city": "", "id": "501", "external_id": "9346", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Namene Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Farm Solar Park", "city": "", "id": "502", "external_id": "9361", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Voltalia UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-11-15", "start_construction": "2021-01-07", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Capenhurst Lane, Capenhurst - Battery storage", "city": "", "id": "503", "external_id": "9377", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "HD888CAP Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stainland Road, Salterhebble - Battery Storage Facility", "city": "", "id": "504", "external_id": "9397", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "North Deane Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dunton Hall - Battery Energy Storage System", "city": "", "id": "505", "external_id": "9427", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "Welbar Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Admiralty Road - Battery Energy Storage Facility", "city": "", "id": "506", "external_id": "9470", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "BAT-NR30 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "507", "external_id": "9475", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "SSE Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Caldwell Road - Battery Storage", "city": "", "id": "508", "external_id": "9507", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Aura Power BESS Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wishaw 49.9 Battery Storage Facility", "city": "", "id": "509", "external_id": "9522", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Spectrum Reserve Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Heysham Energy Storage Project", "city": "", "id": "510", "external_id": "9545", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Kona Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tiddlywink Barn Battery Storage Power Plant", "city": "", "id": "511", "external_id": "9552", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Mcballester Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Davies Road - Battery Storage", "city": "", "id": "512", "external_id": "9563", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "city": "", "id": "513", "external_id": "9565", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Cheshire East Council", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Astra Centre, Royal Barn Road - Energy Storage", "city": "", "id": "514", "external_id": "9584", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Arlington Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Winterton Road - Battery Energy Storage", "city": "", "id": "515", "external_id": "9608", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "95", "power_mw": "95", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Richborough Energy Park - Phase 2", "city": "", "id": "516", "external_id": "9626", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "71", "power_mw": "71", "customer": "", "owner": "Richborough Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bredbury Substation - Battery Storage Facility", "city": "", "id": "517", "external_id": "9653", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Brickmakers Arms Battery", "city": "", "id": "518", "external_id": "9668", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "FPC Industry & Enterprise 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Third Energy UK Gas Limited - Battery Energy Storage", "city": "", "id": "519", "external_id": "9691", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Third Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)", "city": "", "id": "520", "external_id": "9708", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton Lane, Nursling - Battery Storage Facility", "city": "", "id": "521", "external_id": "9760", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cholmondeley Road - Battery Storage", "city": "", "id": "522", "external_id": "9763", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Riverside Estates (NW) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Slough Road - Battery Storage", "city": "", "id": "523", "external_id": "9774", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hybridspeicher AU", "city": "", "id": "524", "external_id": "SEE900291433160", "state": "bavaria", "country": "germany", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Big Battery Lausitz", "city": "", "id": "526", "external_id": "SEE905930139120", "state": "brandenburg", "country": "germany", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "66", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS 2 KW Bexbach", "city": "", "id": "527", "external_id": "SEE908096553144", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "city": "", "id": "528", "external_id": "SEE910324388312", "state": "saxony", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hybridregelkraftwerk", "city": "", "id": "529", "external_id": "SEE913862454280", "state": "bremen", "country": "germany", "capacity_mwh": "14", "estimate_mwh": "", "power_mw": "18", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Fenne", "city": "", "id": "530", "external_id": "SEE919443669678", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMAREG 1", "city": "", "id": "531", "external_id": "SEE931375347240", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batteriespeicherkraftwerk", "city": "", "id": "532", "external_id": "SEE933095868289", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Energiewende-Speicher", "city": "", "id": "533", "external_id": "SEE935506652999", "state": "lower saxony", "country": "germany", "capacity_mwh": "26", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "WBS-Tarzow", "city": "", "id": "534", "external_id": "SEE937857006797", "state": "mecklenburg-vorpommern", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "70000000", "city": "", "id": "535", "external_id": "SEE940316838242", "state": "bavaria", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Weiher", "city": "", "id": "536", "external_id": "SEE941708872783", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Im Buckeberg 62 Stromspeicher", "city": "", "id": "537", "external_id": "SEE946919525862", "state": "baden-wuerttemberg", "country": "germany", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BES BEN", "city": "", "id": "539", "external_id": "SEE963081865633", "state": "saxony", "country": "germany", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Walsum", "city": "", "id": "540", "external_id": "SEE964940893804", "state": "nrw", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Q_ESS_Elverlingsen", "city": "", "id": "541", "external_id": "SEE966091400436", "state": "nrw", "country": "germany", "capacity_mwh": "18", "estimate_mwh": "", "power_mw": "17", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Herne", "city": "", "id": "542", "external_id": "SEE971138728251", "state": "nrw", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BES GRO", "city": "", "id": "544", "external_id": "SEE976362409624", "state": "saxony", "country": "germany", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "RRKW Feldheim", "city": "", "id": "545", "external_id": "SEE976927444749", "state": "brandenburg", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "B\u00fcttel Speicher", "city": "", "id": "546", "external_id": "SEE984446277410", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Bexbach", "city": "", "id": "547", "external_id": "SEE990521990150", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blythe Mesa Solar II", "city": "", "id": "548", "external_id": "65053", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Blythe Mesa Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chaparral Springs", "city": "", "id": "549", "external_id": "64864", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BigBeau Solar, LLC", "city": "", "id": "550", "external_id": "64993", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Big Beau Solar, LLC ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scarlet Solar (CA)", "city": "", "id": "551", "external_id": "64908", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "EDP Renewables North America LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Santa Ana Storage 2", "city": "", "id": "552", "external_id": "64921", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rabbitbrush Solar, LLC", "city": "", "id": "553", "external_id": "64630", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn S1", "city": "", "id": "554", "external_id": "64929", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lake Placid Solar Power Plant", "city": "", "id": "555", "external_id": "62541", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Duke Energy Florida, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mossy Branch Battery Facility", "city": "", "id": "556", "external_id": "65018", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "65", "customer": "", "owner": "Georgia Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Waiawa Solar Power Hybrid", "city": "", "id": "557", "external_id": "65058", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Waiawa Solar Power LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaver Creek I", "city": "", "id": "558", "external_id": "65019", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Beaver Creek Wind I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaver Creek IV", "city": "", "id": "559", "external_id": "65023", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Beaver Creek Wind IV, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaver Creek II", "city": "", "id": "560", "external_id": "65020", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Beaver Creek Wind II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaver Creek III", "city": "", "id": "561", "external_id": "65021", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Beaver Creek Wind III, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Ripley Solar", "city": "", "id": "562", "external_id": "64911", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "ConnectGen Chautauqua County LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cameron Wind 1 LLC", "city": "", "id": "563", "external_id": "59118", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "24", "customer": "", "owner": "Cameron Wind 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dulles Solar and Storage", "city": "", "id": "564", "external_id": "65043", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Dominion Energy Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dry Bridge Storage", "city": "", "id": "565", "external_id": "65044", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Dominion Energy Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batterie Breitenworbis", "city": "", "id": "566", "external_id": "SEE977720016904", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Goyder", "city": "Burra", "id": "567", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "", "estimate_mwh": "1800", "power_mw": "900", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-15", "start_construction": "2022-01-17", "start_operation": "", "start_estimated": "2024", "cost_million": "3000", "cost_currency": "AUD", "cost_incl_solar": "1", "lat": "-33.649566", "long": "139.000287", "coords_hint": "-1", "use_case": "1200MW wind farm support ** 600MW solar support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/neoen-begins-goyder-renewables-zone-wind-solar-storage-hybrid-project-in-south-australia/", "link2": "", "link3": "", "link4": ""}, {"name": "Great Western Battery", "city": "Wallerawang", "id": "568", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "500", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-18", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.397397", "long": "150.067853", "coords_hint": "1", "use_case": "coal plant replacement", "notes": "exact location from scoping report pdf", "project_website": "https://greatwesternbattery.com.au", "link1": "https://www.energy-storage.news/great-western-battery-1000mwh-project-proposed-to-aid-reliability-in-australias-post-coal-age/", "link2": "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "link3": "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-12346552%2120201223T043129.182%20GMT", "link4": ""}, {"name": "Wallerawang 9", "city": "Wallerawang", "id": "569", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "500", "customer": "", "owner": "greenspot", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "400", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "-33.407503", "long": "150.091529", "coords_hint": "1", "use_case": "coal plant replacement", "notes": "exact location from the pdf in sources", "project_website": "https://www.greenspot.com.au/news/wallerawang-9-battery-project-scoping-report/", "link1": "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "link2": "https://www.greenspot.com.au/news/uploads/wallerawang-9-battery-project-scoping-report.pdf", "link3": "", "link4": ""}, {"name": "Crimson", "city": "", "id": "570", "external_id": "65140", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "RE Crimson LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Willow Spring Solar 3, LLC", "city": "", "id": "571", "external_id": "60325", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn S3", "city": "", "id": "572", "external_id": "64928", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "35", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "ENGIE Solidago Solar Project - Hybrid", "city": "", "id": "573", "external_id": "65304", "state": "delaware", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "ENGIE Solidago Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mililani South Solar Farm", "city": "", "id": "574", "external_id": "57242", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "78", "power_mw": "39", "customer": "", "owner": "Mililani I Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "OE_MS6", "city": "", "id": "575", "external_id": "65291", "state": "mississippi", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "OE_MS6", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arida Solar (Hybrid)", "city": "", "id": "576", "external_id": "63841", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "326FW 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Boulder Solar III LLC", "city": "", "id": "577", "external_id": "65141", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "116", "power_mw": "58", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Noble Solar", "city": "", "id": "578", "external_id": "65271", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "BT Noble Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Byrd Ranch Storage", "city": "", "id": "579", "external_id": "65259", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Byrd Ranch Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Deer Wood Storage, LLC", "city": "", "id": "580", "external_id": "65145", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Deer Wood Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bumpers Solar Farm ", "city": "", "id": "581", "external_id": "6913", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-12-01", "start_construction": "", "start_operation": "2020-03-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stranoch 2", "city": "", "id": "582", "external_id": "7306", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "city": "", "id": "583", "external_id": "8342", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rush Green Motors - Battery storage", "city": "", "id": "584", "external_id": "8987", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "North Tawton Primary Substation - Battery Storage", "city": "", "id": "585", "external_id": "9275", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newcastle International Airport Phase 2 - Battery Storage", "city": "", "id": "586", "external_id": "9756", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Newcastle International Airport", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scawby Brook, Brigg - Battery Storage", "city": "", "id": "587", "external_id": "9848", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Centrica Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Braidfield Road, Hardgate - Battery Storage Facility", "city": "", "id": "588", "external_id": "9869", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group Plc ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ipswich Road, Cardiff - Battery Storage ", "city": "", "id": "589", "external_id": "9910", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Douglas West Wind Farm (extension)", "city": "", "id": "590", "external_id": "9957", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Greencoat UK Wind PLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pound Farm Lane - Battery Storage", "city": "", "id": "591", "external_id": "9969", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barlow Road, Barlow - Battery Storage", "city": "", "id": "592", "external_id": "9970", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Northington Lane - Battery Storage Facility", "city": "", "id": "593", "external_id": "9992", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sundon Sub Station Battery Storage Facility", "city": "", "id": "594", "external_id": "9998", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Clearstone Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mount Road, Castle Gresley - Battery Storage Facility", "city": "", "id": "595", "external_id": "10012", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Flexion Energy UK Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cellarhead - Battery Site", "city": "", "id": "596", "external_id": "10013", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "C&S Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "597", "external_id": "10022", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "SSE Enterprise Contracting", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Electricity Sub Station, Strichen - Battery Storage Facility", "city": "", "id": "598", "external_id": "10039", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Caton Road, Lancaster - Battery Storage Facility", "city": "", "id": "599", "external_id": "10047", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Energi Generation 12 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "St Dennis - Battery Energy Storage", "city": "", "id": "600", "external_id": "10058", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Renewable Connections Ltd / Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Park Road Battery Storage", "city": "", "id": "601", "external_id": "10076", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Arlington Energy Limited Avery Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greystones Road, Grangetown - Battery Energy Storage System", "city": "", "id": "602", "external_id": "10081", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "360", "power_mw": "360", "customer": "", "owner": "Sembcorp Utilities UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "city": "", "id": "603", "external_id": "10163", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Fleet BESS Limited & SSE Energy Solutions Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Marsh Road - Battery Energy Storage System", "city": "", "id": "604", "external_id": "10173", "state": "east midlands", "country": "uk", "capacity_mwh": "1100", "estimate_mwh": "", "power_mw": "550", "customer": "", "owner": "Spalding Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-28", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.great.gov.uk/international/content/investment/opportunities/spalding-battery-energy-storage-system-in-lincolnshire/", "link2": "", "link3": "", "link4": ""}, {"name": "The Transmitting Station, Williton - Battery Storage", "city": "", "id": "605", "external_id": "10186", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Elgin Energy ES Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "A981 Fraserburgh - Battery Energy Storage", "city": "", "id": "606", "external_id": "10222", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Fraserburgh Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upper Geiselittle - Energy Storage Facility", "city": "", "id": "607", "external_id": "10225", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "city": "", "id": "608", "external_id": "10226", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elland Storage Project", "city": "", "id": "609", "external_id": "10236", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lethen Wind Farm Wind Turbines and Energy Storage", "city": "", "id": "610", "external_id": "10237", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Fred Olsen Renewables Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordtown Energy Storage (Resubmission)", "city": "", "id": "611", "external_id": "10239", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments (ILI)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hollandmey Renewable Energy Development", "city": "", "id": "612", "external_id": "10246", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Scottishpower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Doverdale - Solar Farm & Battery Storage", "city": "", "id": "613", "external_id": "10273", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Patch Elm Lane - Battery Storage ", "city": "", "id": "614", "external_id": "10282", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cheshire Power Station - Battery Storage Facility", "city": "", "id": "615", "external_id": "10295", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "RWE Generation UK Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "city": "", "id": "616", "external_id": "10302", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Lawford Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stoke Lane - Battery Energy Storage", "city": "", "id": "618", "external_id": "10390", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "FPC Electric Land Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Speyslaw Farm - Battery Storage", "city": "", "id": "619", "external_id": "10394", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Elgin Energy EsCo", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hummingbird Energy Storage LLC", "city": "", "id": "620", "external_id": "65395", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Hummingbird Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Santa Paula Energy Storage LLC", "city": "", "id": "621", "external_id": "65397", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Santa Paula Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Black Walnut Energy Storage LLC", "city": "", "id": "622", "external_id": "65396", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Black Walnut Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Homestead Energy Storage LLC", "city": "", "id": "623", "external_id": "65398", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "Homestead Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hot Pot Solar", "city": "", "id": "624", "external_id": "65419", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "560", "power_mw": "280", "customer": "", "owner": "Nevada Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Iron Point Solar (Hybrid)", "city": "", "id": "625", "external_id": "65377", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Nevada Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wolf Pit Branch Solar, LLC", "city": "", "id": "626", "external_id": "65437", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Wolf Pit Branch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cunningham Storage", "city": "", "id": "627", "external_id": "65410", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "380", "power_mw": "190", "customer": "", "owner": "BT Cunningham Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Noria Hondo Solar (Hybrid)", "city": "", "id": "628", "external_id": "65344", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Noria Hondo Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roseland Solar Project, LLC", "city": "", "id": "629", "external_id": "65028", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "118", "power_mw": "59", "customer": "", "owner": "Enel Green Power Roseland Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Midmill, Kintore - Battery Energy Storage", "city": "", "id": "630", "external_id": "10701", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rusholme Grange", "city": "", "id": "631", "external_id": "7093", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Hedge Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vicarage Drove - Solar farm & Battery storage", "city": "", "id": "632", "external_id": "8518", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Connections Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Moggerhanger Road, Sandy - Solar Farm", "city": "", "id": "633", "external_id": "10981", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Kach Capital Estates Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Battlesbridge Bypass, Rettendon - Battery Storage", "city": "", "id": "634", "external_id": "9801", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "city": "", "id": "635", "external_id": "10436", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Bluefield Sandbach Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vause Farm - Battery Storage", "city": "", "id": "636", "external_id": "10989", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Sirius Renewable Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Thinford Lane, Thinford - Energy Storage", "city": "", "id": "637", "external_id": "10489", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Renewable Energy Systems Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Field House Solar Farm", "city": "", "id": "638", "external_id": "10970", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Albanwise Synergy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ferrymuir", "city": "", "id": "639", "external_id": "7371", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gore Street Energy Storage Fund", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-21", "start_construction": "1905-07-14", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Strathruddie, Kinglassie - Solar farm", "city": "", "id": "640", "external_id": "10828", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Connection Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Broomloan Road - Battery Energy Storage", "city": "", "id": "641", "external_id": "10886", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Lifetime Property Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "city": "", "id": "642", "external_id": "10716", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "R & S Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Model Farm", "city": "", "id": "643", "external_id": "10687", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walpole St Andrew - Battery storage ", "city": "", "id": "644", "external_id": "10876", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Alfred Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Netherlands Way - Battery Energy Facility", "city": "", "id": "645", "external_id": "10429", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Volta Energy Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "St Ippolyts - Solar Farm & Battery Storage", "city": "", "id": "646", "external_id": "9695", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brown Edge - Battery Storage", "city": "", "id": "647", "external_id": "10431", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Broadgate, Chadderton - Battery Storage Containers", "city": "", "id": "648", "external_id": "10690", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pleasance Road - Battery Energy Facility", "city": "", "id": "649", "external_id": "9997", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coronation Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Binn Eco Park Wind Farm Energy Storage Facility", "city": "", "id": "650", "external_id": "9098", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Green Cat Renewables Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Jamesfield Organic Centre, Phase 1", "city": "Abernethy", "id": "651", "external_id": "10456", "state": "fife", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "Possible duplicate of 130", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Plymouth Stor Generation - Battery storage", "city": "", "id": "652", "external_id": "10432", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackhillock Electricity Substation - Battery Energy Storage System", "city": "", "id": "653", "external_id": "9723", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Zenobe Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hunterston Grid Services Complex - Energy Storage Facility", "city": "", "id": "654", "external_id": "10535", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Amp Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kincardine Grid Services Complex - Energy Storage Facility", "city": "", "id": "655", "external_id": "10536", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Amp Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carrick Windfarm", "city": "", "id": "656", "external_id": "10540", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": " Frodo Solar and Battery Energy Development", "city": "", "id": "657", "external_id": "10994", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Energy International", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clachaig Glen", "city": "", "id": "658", "external_id": "10996", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "RWE UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chleansaid Onshore Wind Farm", "city": "", "id": "659", "external_id": "10997", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "city": "", "id": "660", "external_id": "7168", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Public Power Solutions (PPS) / West Sussex County Council", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dalmarnock Road - Battery Storage", "city": "", "id": "661", "external_id": "8507", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Colton - Solar photovoltaic farm, Battery storage", "city": "", "id": "662", "external_id": "10945", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Burcot Solar Farm", "city": "", "id": "663", "external_id": "9374", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Burcot Solar Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penstone Lane, Penn 1 - Battery Storage Facility", "city": "", "id": "664", "external_id": "10705", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penstone Lane, Lower Penn 2 - Battery Storage", "city": "", "id": "665", "external_id": "10733", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "city": "", "id": "666", "external_id": "10978", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hook Street - Energy Storage Compound", "city": "", "id": "667", "external_id": "10142", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shindour - Energy Storage Facility", "city": "", "id": "668", "external_id": "8464", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton Lane, Nursling - Battery Storage Facility", "city": "", "id": "669", "external_id": "9673", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Claydon Farm - Solar Farm & Battery Storage", "city": "", "id": "670", "external_id": "8039", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects 17 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Croftmore - Battery Energy Storage ", "city": "", "id": "671", "external_id": "10700", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Crow Solar Park", "city": "", "id": "672", "external_id": "7175", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "INRG Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane", "city": "", "id": "673", "external_id": "7148", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Walker & Son (Hauliers) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-10-06", "start_construction": "2018-03-01", "start_operation": "2018-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lanegreat Barr, Great Barr - Battery Storage Facility", "city": "", "id": "674", "external_id": "10438", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grendon Lakes, Grendon - Battery Storage Facility", "city": "", "id": "675", "external_id": "10955", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drumshoreland Road Battery Storage Facility", "city": "", "id": "676", "external_id": "8920", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Sirius Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "city": "", "id": "677", "external_id": "10488", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "HB222BRI Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batterie Eisenach", "city": "", "id": "678", "external_id": "SEE982806373970", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Anode (Springville) BESS", "city": "", "id": "679", "external_id": "65458", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Separator (Etiwanda) BESS", "city": "", "id": "680", "external_id": "65456", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cathode (Hinson) BESS", "city": "", "id": "681", "external_id": "65457", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beartooth Energy Storage LLC", "city": "", "id": "682", "external_id": "65407", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Beartooth Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lone Star Solar", "city": "", "id": "683", "external_id": "62235", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "132", "power_mw": "66", "customer": "", "owner": "Lone Star Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ridgely Energy Farm", "city": "", "id": "684", "external_id": "65445", "state": "tennessee", "country": "usa", "capacity_mwh": "", "estimate_mwh": "138", "power_mw": "69", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dickens", "city": "", "id": "685", "external_id": "65489", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hydra", "city": "", "id": "686", "external_id": "65490", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paleo", "city": "", "id": "687", "external_id": "65491", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pavo", "city": "", "id": "688", "external_id": "65492", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "175", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tortolas", "city": "", "id": "689", "external_id": "65493", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Danville BESS 1", "city": "", "id": "690", "external_id": "65499", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Doc Brown LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kogan Creek / Chinchilla", "city": "", "id": "691", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "CS Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "80", "status": "operation", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "cost_million": "150", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-26.917756", "long": "150.746113", "coords_hint": "2", "use_case": "", "notes": "used day of tweet as operation start date", "project_website": "", "link1": "https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "link2": "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "link3": "https://twitter.com/SawyerMerritt/status/1764791615061668146", "link4": ""}, {"name": "Dalian Flow Battery", "city": "Dalian", "id": "692", "external_id": "", "state": "liaoning", "country": "china", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Dalian Institute of Chemical Physics", "developer": "", "manufacturer": "", "type": "vanadium flow", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-05", "start_estimated": "", "cost_million": "266", "cost_currency": "USD", "cost_incl_solar": "", "lat": "38.858928", "long": "121.517064", "coords_hint": "3", "use_case": "peak shaving", "notes": "will be scaled up to 200mw/800mwh", "project_website": "", "link1": "https://www.pv-magazine.com/2022/09/29/china-connects-worlds-largest-redox-flow-battery-system-to-grid/", "link2": "", "link3": "", "link4": ""}, {"name": "Kenhardt 1-3", "city": "Kenhardt", "id": "693", "external_id": "", "state": "northern cape", "country": "south africa", "capacity_mwh": "1140", "estimate_mwh": "", "power_mw": "225", "customer": "", "owner": "", "developer": "scatec", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2022-10-05", "start_operation": "", "start_estimated": "", "cost_million": "1000", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "-29.345075", "long": "21.149171", "coords_hint": "3", "use_case": "540MW solar farm support", "notes": "those are 3 projects that will be built", "project_website": "https://scatec.com/locations/south-africa/#kenhardt-1-3-south-africa-540-mw", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Humidor Storage I", "city": "", "id": "694", "external_id": "65703", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Hecate Grid Humidor Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sanborn BESS 3", "city": "", "id": "695", "external_id": "65672", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "175", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Quartzite", "city": "", "id": "696", "external_id": "59871", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Desert Quartzite LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vikings Energy Farm", "city": "", "id": "697", "external_id": "65711", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Vikings Energy Farm, LLC", "developer": "arevon", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.804395", "long": "-115.274713", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/viking/", "link1": "https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "link2": "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E1B", "city": "", "id": "698", "external_id": "65674", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "280", "power_mw": "140", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arica Solar", "city": "", "id": "699", "external_id": "65744", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "272", "power_mw": "136", "customer": "", "owner": "Arica Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AVEP BESS", "city": "", "id": "700", "external_id": "65591", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "252", "power_mw": "126", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Oberon Solar Project", "city": "", "id": "701", "external_id": "65734", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "IP Oberon LLC", "developer": "Intersect Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.717864", "long": "-115.358576", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "link2": "http://www.aspeneg.com/oberon-renewable-energy-project/", "link3": "", "link4": ""}, {"name": "Oberon II Solar Project", "city": "", "id": "702", "external_id": "65735", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "IP Oberon II, LLC", "developer": "Intersect Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.718247", "long": "-115.35194", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "link2": "http://www.aspeneg.com/oberon-renewable-energy-project/", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E4", "city": "", "id": "703", "external_id": "65675", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "218", "power_mw": "109", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sandrini Solar 100", "city": "", "id": "704", "external_id": "65664", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "190", "power_mw": "95", "customer": "", "owner": "EDPR CA Solar Park II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chiquito Grid, LLC", "city": "", "id": "705", "external_id": "65655", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Chiquito Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E5", "city": "", "id": "706", "external_id": "65676", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "San Jacinto Grid, LLC", "city": "", "id": "707", "external_id": "65657", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "65", "customer": "", "owner": "San Jacinto Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sanborn EBESS1", "city": "", "id": "708", "external_id": "65673", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "114", "power_mw": "57", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Victory Pass", "city": "", "id": "709", "external_id": "65743", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Victory Pass I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn S4", "city": "", "id": "710", "external_id": "65677", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ortega Grid, LLC", "city": "", "id": "711", "external_id": "65656", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Ortega Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Energy Desert Storage 1 LLC", "city": "", "id": "712", "external_id": "65635", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Energy Desert Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carris Storage I", "city": "", "id": "713", "external_id": "65733", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Grid Carris Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "NY6 Battery", "city": "", "id": "714", "external_id": "65692", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carina", "city": "", "id": "715", "external_id": "65589", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Octans", "city": "", "id": "716", "external_id": "65590", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX12 Silicon Hill Storage", "city": "", "id": "717", "external_id": "65695", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX10 Hummingbird Storage", "city": "", "id": "718", "external_id": "65693", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX15 Limousin Oak Storage", "city": "", "id": "719", "external_id": "65698", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Antlia", "city": "", "id": "720", "external_id": "65588", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX11 Republic Road Storage", "city": "", "id": "721", "external_id": "65694", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX23 Roughneck Storage", "city": "", "id": "722", "external_id": "65701", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX13 Endurance Park Storage", "city": "", "id": "723", "external_id": "65696", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX19 River Valley Storage 1", "city": "", "id": "724", "external_id": "65699", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX21 River Valley Storage 2", "city": "", "id": "725", "external_id": "65700", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tollgate Battery Storage Facility", "city": "", "id": "726", "external_id": "6949", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Breach Farm", "city": "", "id": "727", "external_id": "6962", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Hedge Energy Barn", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hilfield Farm Tech", "city": "", "id": "728", "external_id": "7030", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lackenby", "city": "", "id": "729", "external_id": "7040", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lovedean Energy Storage System", "city": "", "id": "730", "external_id": "7064", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gloucestershire Science and Technology Park (small)", "city": "", "id": "731", "external_id": "7181", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordtown Energy Storage", "city": "", "id": "732", "external_id": "7234", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Shires Hamilton", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tiddlywink Barn", "city": "", "id": "733", "external_id": "7527", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "McBallester", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitminster - Solar Farm & Battery Storage", "city": "", "id": "734", "external_id": "8844", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects 7 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Kilbride - Battery storage", "city": "", "id": "735", "external_id": "9013", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Cathkin Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Devilla Energy Storage Facility", "city": "", "id": "736", "external_id": "9248", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hales Lane - Battery Storage Facility", "city": "", "id": "737", "external_id": "9635", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drum Farm - Battery Energy Storage System", "city": "", "id": "738", "external_id": "9940", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy System Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Battery Storage", "city": "", "id": "739", "external_id": "10145", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newfields Farm - Battery Energy Storage", "city": "", "id": "740", "external_id": "10233", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "REPD Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newburgh Road, Abernethy - Battery Storage ", "city": "", "id": "741", "external_id": "10607", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "P & M Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Sleekburn - Battery Storage Compound", "city": "", "id": "743", "external_id": "10957", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Enviromena Asset Management UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maybrook Road - Battery facility", "city": "", "id": "744", "external_id": "11008", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Conrad Energy (Develeopments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "city": "", "id": "745", "external_id": "11092", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tealing Battery Energy Storage Farm", "city": "", "id": "746", "external_id": "11097", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Sirius EcoDev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grayside Wind Farm", "city": "", "id": "747", "external_id": "11113", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Grayside WF", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chadderton - Battery energy storage facility", "city": "", "id": "748", "external_id": "11160", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Field", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-06-01", "start_construction": "2021-12-20", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Richborough Energy Park - Phase 3", "city": "", "id": "749", "external_id": "11201", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "249", "power_mw": "249", "customer": "", "owner": "Sheaf Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stocking Pelham - Battery Storage System", "city": "", "id": "750", "external_id": "11212", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Connections", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penwortham - Battery storage", "city": "", "id": "751", "external_id": "11217", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Armadale Wind Farm", "city": "", "id": "752", "external_id": "11219", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Brookfield Renewable UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bath Mews, Minsterley - 10MW Battery Storage Facility", "city": "", "id": "753", "external_id": "11369", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lowlands Farm - Battery Storage", "city": "", "id": "754", "external_id": "11399", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Patch Elm Lane - Battery Storage ", "city": "", "id": "755", "external_id": "11415", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brown Edge - Battery Storage", "city": "", "id": "756", "external_id": "11418", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Melton Electricity Substation - Energy Storage System", "city": "", "id": "757", "external_id": "11436", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "26", "customer": "", "owner": "Brampton Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Teviot Wind Farm", "city": "", "id": "758", "external_id": "11442", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Muirhall Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "city": "", "id": "759", "external_id": "11449", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harrington Franklin Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "city": "", "id": "760", "external_id": "11482", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Elgin Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rothienorman - Battery Energy Storage Facility", "city": "", "id": "761", "external_id": "11497", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Earthcott Green - Battery Storage", "city": "", "id": "762", "external_id": "11510", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecotricity Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kingston Road, Slimbridge - Battery Storage", "city": "", "id": "763", "external_id": "11516", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Relay Slimbridge Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Llwyn Onn - Solar Farm & Battery Storage", "city": "", "id": "764", "external_id": "11544", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Third Drove, Fengate - Battery Storage", "city": "", "id": "765", "external_id": "11558", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Flag Fen Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sutton Manor - Battery Storage Facility", "city": "", "id": "766", "external_id": "11559", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Sizing John Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Temple Oaks Renewable Energy Park", "city": "", "id": "767", "external_id": "11562", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "240", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Craig Watch - Wind Farm & Battery Storage", "city": "", "id": "768", "external_id": "11609", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "27", "power_mw": "27", "customer": "", "owner": "Craig Watch Wind Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grassing Rome Street - Battery Storage", "city": "", "id": "769", "external_id": "11611", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "STOR 141 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "city": "", "id": "770", "external_id": "11612", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "ADV 003 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "city": "", "id": "771", "external_id": "11619", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Lightsource BP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mesquite Solar 5, LLC", "city": "", "id": "772", "external_id": "65963", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mesquite Solar 4, LLC", "city": "", "id": "773", "external_id": "65962", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Nighthawk Energy Storage, LLC", "city": "", "id": "774", "external_id": "65889", "state": "california", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "600", "power_mw": "300", "customer": "arevon", "owner": "Nighthawk Energy Storage, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.957486", "long": "-117.038749", "coords_hint": "3", "use_case": "", "notes": "got the coords from arevon website, but probably not the exact location yet", "project_website": "https://arevonenergy.com/location/nighthawk/", "link1": "https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/", "link2": "", "link3": "", "link4": ""}, {"name": "Sacramento Valley Energy Center, LLC", "city": "", "id": "775", "external_id": "65808", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Sacramento Valley Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sagebrush ESS", "city": "", "id": "776", "external_id": "65933", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Sagebrush ESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Santa Ana Storage 3", "city": "", "id": "777", "external_id": "65789", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Honey Creek Solar", "city": "", "id": "778", "external_id": "65821", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Andover Energy Storage Project", "city": "", "id": "779", "external_id": "65952", "state": "new jersey", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI 25 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chill Sun Solar Project", "city": "", "id": "780", "external_id": "65895", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "4500", "power_mw": "2250", "customer": "", "owner": "Naturgy Candela DevCo LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bowling Green Energy Storage Project", "city": "", "id": "781", "external_id": "65951", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "VESI 21 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Goldenrod Creek Solar and BESS SLF", "city": "", "id": "782", "external_id": "65845", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1320", "power_mw": "660", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lunis Creek Solar and BESS SLF", "city": "", "id": "783", "external_id": "65852", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1242", "power_mw": "621", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clear Fork Creek Solar and BESS SLF", "city": "", "id": "784", "external_id": "65842", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1200", "power_mw": "600", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dogwood Creek Solar and BESS", "city": "", "id": "785", "external_id": "65843", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "886", "power_mw": "443", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hollow Branch Creek 2 Solar and BESS SLF", "city": "", "id": "786", "external_id": "65851", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rowdy Creek Solar and BESS", "city": "", "id": "787", "external_id": "65854", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.639763", "long": "-95.58367", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, {"name": "Tehuacana Creek 1 Solar and BESS", "city": "", "id": "788", "external_id": "65855", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.02785", "long": "-96.498753", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, {"name": "Tehuacana Creek 2 Solar and BESS", "city": "", "id": "789", "external_id": "65856", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.025913", "long": "-96.503077", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, {"name": "Middlebrook Creek Solar and BESS", "city": "", "id": "790", "external_id": "65853", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "604", "power_mw": "302", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.598849", "long": "-94.598401", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, {"name": "Zeya", "city": "", "id": "791", "external_id": "65880", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cachi", "city": "", "id": "792", "external_id": "65861", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Castor", "city": "", "id": "793", "external_id": "65870", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desna", "city": "", "id": "794", "external_id": "65876", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eldora Energy LLC", "city": "", "id": "795", "external_id": "65847", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Eldora Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Avila", "city": "", "id": "796", "external_id": "65860", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "320", "power_mw": "160", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KCE TX 14: Venus Mill Storage", "city": "", "id": "797", "external_id": "65788", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elio Energy LLC", "city": "", "id": "798", "external_id": "65850", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Elio Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Oriana Solar LLC", "city": "", "id": "799", "external_id": "65849", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Oriana Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Talitha Energy Project, LLC", "city": "", "id": "800", "external_id": "65891", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Talitha Energy Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newhouse Farm - Energy Storage Facility", "city": "", "id": "801", "external_id": "9047", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fiddlers Ferry Power Station - Battery storage", "city": "", "id": "802", "external_id": "9404", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "SSE Enterprise (SSE PLC)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kilmarnock South Substation - Battery storage", "city": "", "id": "803", "external_id": "9696", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "North Walpole, St Peter - Battery Energy Storage", "city": "", "id": "804", "external_id": "9762", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Roc Noir Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ochiltree - Battery Sorage", "city": "", "id": "805", "external_id": "10162", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bullen Lane - Battery Storage", "city": "", "id": "806", "external_id": "10311", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Cambridge Power Limited / Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Uskmouth Power Station - Battery Storage", "city": "", "id": "807", "external_id": "10936", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "230", "power_mw": "230", "customer": "", "owner": "Simec Atlantic Energy Uskmouth Power Station", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Bendings - Battery Storage", "city": "", "id": "808", "external_id": "10985", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Fiddes Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gotham - Battery Energy storage", "city": "", "id": "809", "external_id": "10986", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Net Zero Energy Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ash Lane, Little London - Battery Storage", "city": "", "id": "810", "external_id": "11090", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Bramley BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Worset Lane - Battery Energy Storage System", "city": "", "id": "811", "external_id": "11406", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Clearstone Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "city": "", "id": "812", "external_id": "11414", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Neil Fox Way - Battery Storage", "city": "Wakefield", "id": "813", "external_id": "11519", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.67289", "long": "-1.46662", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://planning.wakefield.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=REJXN6QQFWN00", "link2": "", "link3": "", "link4": ""}, {"name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "city": "", "id": "814", "external_id": "11623", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "66", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility", "city": "", "id": "815", "external_id": "11636", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Kronos Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "High Road, Saddlebow - Battery Storage", "city": "", "id": "816", "external_id": "11648", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Lynn Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Knockkippen Wind, Solar & Battery Farm", "city": "", "id": "817", "external_id": "11676", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Falck Renewables / REG Windpower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dragons Lane - Battery Storage Facility", "city": "", "id": "818", "external_id": "11701", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Hydrock", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clay Tye Farm Phase 1 - Storage Facility", "city": "Upminster", "id": "819", "external_id": "11720", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-07-18", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552891", "long": "0.293464", "coords_hint": "", "use_case": "", "notes": "Duplicate of 76", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clay Tye Farm Phase 2 - Storage Facility", "city": "Upminster", "id": "820", "external_id": "11721", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-09-10", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552891", "long": "0.293464", "coords_hint": "", "use_case": "", "notes": "Duplicate of 76", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Indian Queens Sub-Station - Battery Storage", "city": "", "id": "821", "external_id": "11725", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "Prime Energy Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Catsbrain Farm - Battery Storage ", "city": "", "id": "822", "external_id": "11787", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Conrad Energy (Developments) II Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "city": "", "id": "823", "external_id": "11793", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Raith (Glenniston)", "city": "Auchtertool", "id": "824", "external_id": "11808", "state": "fife", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49.5", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-little-raith-bess/", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary", "link3": "", "link4": ""}, {"name": "Fairholme, Minety - Battery Storage", "city": "", "id": "825", "external_id": "11810", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stonehill, Minety", "city": "", "id": "826", "external_id": "11812", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Penso Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whites Farm - Battery Storage", "city": "", "id": "827", "external_id": "11880", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sclenteuch Wind Farm ", "city": "", "id": "828", "external_id": "11987", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Braintree Road, Cressing - Battery Storage", "city": "", "id": "829", "external_id": "11995", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Househill House, Househill - Battery Storage", "city": "", "id": "830", "external_id": "12056", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sandy Knowe Wind Farm Extension", "city": "", "id": "831", "external_id": "12080", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Executive Resource Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "city": "", "id": "832", "external_id": "12125", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Infra Balance New Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "city": "", "id": "833", "external_id": "12174", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "STOR 107 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Waterloo Farm, Furbarn Road - Battery Storage", "city": "", "id": "834", "external_id": "12187", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Redcote Lane, Armley - Battery Storage Facility", "city": "", "id": "835", "external_id": "12224", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Leeds Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hawkers Hill Energy Park", "city": "", "id": "836", "external_id": "12293", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Tag Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-09-22", "start_construction": "2020-05-05", "start_operation": "2022-10-03", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Back Lane, Skerne - Solar Farm & Battery Storage", "city": "", "id": "837", "external_id": "12297", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "BayWa r.e. UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batterie Diespeck", "city": "", "id": "838", "external_id": "SEE995000682977", "state": "bavaria", "country": "germany", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMAREG4 Wartburgspeicher Eisenach", "city": "", "id": "839", "external_id": "SEE954649497618", "state": "thuringia", "country": "germany", "capacity_mwh": "67", "estimate_mwh": "", "power_mw": "60", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batterie Iphofen", "city": "", "id": "840", "external_id": "SEE934353123843", "state": "bavaria", "country": "germany", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bad D\u00fcben Battery Storage", "city": "", "id": "841", "external_id": "SEE961989517128", "state": "saxony", "country": "germany", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elsteraue Battery Storage", "city": "", "id": "842", "external_id": "SEE932907515472", "state": "saxony-anhalt", "country": "germany", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lessines", "city": "", "id": "843", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "Corsica Sole", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "cost_million": "33", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "50.72743", "long": "3.854307", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://insideevs.com/news/625965/tesla-megapack-battery-belgium/", "link2": "", "link3": "", "link4": ""}, {"name": "Bumpers", "city": "Princes Risborough", "id": "844", "external_id": "", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "56", "status": "operation", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.7485", "long": "-0.88913", "coords_hint": "1", "use_case": "", "notes": "Construction dates from TTRO application", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-bumpers-bess/", "link1": "https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "link2": "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "link3": "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "link4": "https://twitter.com/heitplc/status/1679460677226823680"}, {"name": "Broadditch", "city": "Southfleet", "id": "845", "external_id": "", "state": "kent", "country": "uk", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.41493", "long": "0.32622", "coords_hint": "1", "use_case": "", "notes": "uses the megapack xl", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf", "link3": "", "link4": ""}, {"name": "Pillswood Phase 2", "city": "Cottingham", "id": "846", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Tesla", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": "https://twitter.com/Tesla_Megapack/status/1661649261757612032"}, {"name": "Farnham", "city": "Farnham", "id": "847", "external_id": "", "state": "surrey", "country": "uk", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.18894", "long": "-0.82903032", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "link3": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/", "link4": ""}, {"name": "Wormald Green", "city": "Harrogate", "id": "848", "external_id": "", "state": "yorkshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.07548", "long": "-1.52312", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, {"name": "Hawthorn Pit", "city": "Murton", "id": "849", "external_id": "", "state": "county durham", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99.8", "power_mw": "49.9", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.80552", "long": "-1.40646", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, {"name": "Western Downs Battery", "city": "South West Queensland", "id": "850", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "270", "customer": "Neoen Australia", "owner": "Neoen", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-26.976142", "long": "150.666771", "coords_hint": "2", "use_case": "solar farm support", "notes": "", "project_website": "https://westerndownsgreenpowerhub.com.au/", "link1": "https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "link2": "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/", "link3": "", "link4": ""}, {"name": "Sierra Estrella Energy Storage", "city": "", "id": "851", "external_id": "66334", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "276", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.410648", "long": "-112.313765", "coords_hint": "1", "use_case": "", "notes": "got the location from the map on the projects page / nr of megapacks from the pdf", "project_website": "https://www.sierraestrellaenergystorage.com/about", "link1": "https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf", "link2": "", "link3": "", "link4": ""}, {"name": "Superstition Energy Storage", "city": "Gilbert", "id": "852", "external_id": "66333", "state": "arizona", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "", "power_mw": "90", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.358927", "long": "-111.831039", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.superstitionenergystorage.com/about", "link1": "https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, {"name": "Desert Peak Energy Storage I", "city": "", "id": "853", "external_id": "65987", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "650", "power_mw": "325", "customer": "", "owner": "Desert Peak Energy Storage I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "CED West Side Canal Battery Storage", "city": "", "id": "854", "external_id": "65980", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "262", "power_mw": "131", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lancaster Area Battery", "city": "", "id": "855", "external_id": "66050", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "254", "power_mw": "127", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Peak Energy Storage II", "city": "", "id": "856", "external_id": "65988", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Desert Peak Energy Storage II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES Waiawa Phase 2 Solar", "city": "", "id": "857", "external_id": "66066", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Camp Lejeune Solar and Energy Storage", "city": "", "id": "858", "external_id": "59966", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Duke Energy Progress - (NC)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "House Mountain", "city": "", "id": "859", "external_id": "66006", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "63", "customer": "", "owner": "House Mountain", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peony Solar 1", "city": "", "id": "861", "external_id": "66131", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "124", "power_mw": "62", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trinity River Solar 1", "city": "", "id": "862", "external_id": "66132", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Zier Solar", "city": "", "id": "863", "external_id": "66137", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Cypress Creek Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Condor", "city": "", "id": "864", "external_id": "66285", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.020505", "long": "-117.332255", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/condor/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/", "link2": "", "link3": "", "link4": ""}, {"name": "Peregrine", "city": "San Diego", "id": "865", "external_id": "66286", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.692183", "long": "-117.13667", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/peregrine/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/", "link2": "", "link3": "", "link4": ""}, {"name": "Oneida Energy Storage Project", "city": "Haldimand County", "id": "866", "external_id": "", "state": "ontario", "country": "canada", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "NRStor", "owner": "Northland Power ** SNGRDC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "42.886859", "long": "-80.12224", "coords_hint": "3", "use_case": "", "notes": "The article mentions Jarvis in Haldimand County", "project_website": "https://www.snfuture.com/projects/oneida-energy-storage/", "link1": "https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/", "link2": "", "link3": "", "link4": ""}, {"name": "Jurong Island", "city": "", "id": "867", "external_id": "", "state": "", "country": "singapore", "capacity_mwh": "285", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "", "developer": "sembcorp", "manufacturer": "huawei", "type": "", "cells": "lfp", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-02-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "1.266316", "long": "103.703028", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/southeast-asias-biggest-battery-storage-project-officially-opened-in-singapore/", "link2": "", "link3": "", "link4": ""}, {"name": "Manor Farm Energy Storage", "city": "", "id": "868", "external_id": "6948", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Innova Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clash Gour", "city": "", "id": "869", "external_id": "7178", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Renewables/ Force 9 ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sheirdrim Renewable Energy Development - Battery", "city": "", "id": "870", "external_id": "7585", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "38", "power_mw": "38", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Welkin Mill", "city": "", "id": "871", "external_id": "7832", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wissett Solar Farm, Wissett - Battery Storage", "city": "", "id": "872", "external_id": "9913", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitehill Energy Storage", "city": "", "id": "873", "external_id": "10466", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newmarket Road, Bottisham - Battery Energy Storage", "city": "", "id": "874", "external_id": "10486", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shaftesbury Energy Park - Battery Storage System", "city": "", "id": "875", "external_id": "10626", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": " TagEnergy ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rothienorman - Battery Storage", "city": "", "id": "876", "external_id": "10638", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hopsrig Wind Farm", "city": "", "id": "877", "external_id": "11066", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Muirhall Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Staythorpe Road - Battery energy storage", "city": "", "id": "878", "external_id": "11321", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Ecap Staythorpe BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Swangate Project - Energy Storage System", "city": "", "id": "879", "external_id": "11437", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Econergy International Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Overhill Farm, Rothienorman - Battery Energy Storage", "city": "", "id": "880", "external_id": "11590", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Beanit Farm, Balsall Common - Battery Storage", "city": "", "id": "881", "external_id": "11656", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rectory Farm, Rectory Lane - Battery Storage", "city": "", "id": "882", "external_id": "11905", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hillside Farm, Lancaster Road - Battery Storage", "city": "", "id": "883", "external_id": "11948", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Hamilton March", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "city": "", "id": "884", "external_id": "12206", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "1000", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "city": "", "id": "885", "external_id": "12303", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Flexion Energy UK Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ryton End, Barston - Battery Storage", "city": "", "id": "886", "external_id": "12348", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Greenfield Energy Consultancy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Killoch Depot, Killoch Colliery - Battery Storage", "city": "", "id": "887", "external_id": "12349", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Brockwell Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sellindge Substation, Church Lane - Battery Storage", "city": "", "id": "888", "external_id": "12351", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivoted Power Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pound Road, Hawkchurch - Battery Energy Storage", "city": "", "id": "889", "external_id": "12360", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "120", "customer": "", "owner": "Enso Green Holdings B Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sunny Oaks Renewable Energy Park", "city": "", "id": "890", "external_id": "12415", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Sunny Oaks Renewable Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "John Green Frog Power Compound, John North Road - Battery System", "city": "", "id": "891", "external_id": "12455", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Electricity Substation, Westerton Road - Battery Storage", "city": "", "id": "892", "external_id": "12467", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Keith Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eggborough Power Station, Selby Road - Battery Storage", "city": "", "id": "893", "external_id": "12483", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Eggborough Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Capenhurst Lane, Capenhurst - Battery Storage", "city": "", "id": "894", "external_id": "12503", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "city": "", "id": "895", "external_id": "12524", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Ecclesfield Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norwich Road Industrial Estate", "city": "", "id": "896", "external_id": "12529", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Eelpower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-26", "start_construction": "2022-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "city": "", "id": "897", "external_id": "12571", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "898", "external_id": "12649", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walpole Sub Station, Walpole Bank - Battery Storage", "city": "", "id": "899", "external_id": "12683", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Field Devco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Misslebrook Farm, Botley Road - Battery Storage", "city": "", "id": "900", "external_id": "12691", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Boom Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Freshfields, Fairy Lane - Battery Storage", "city": "", "id": "901", "external_id": "12694", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "STOR Power Utilities Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Landulph, Ellbridge Lane - Battery Storage Facility", "city": "", "id": "902", "external_id": "12697", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivoted Power Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Southfields Farm, Common Lane - Battery Storage", "city": "", "id": "903", "external_id": "12698", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "Toton Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "North Lincolnshire Green Energy Park", "city": "", "id": "904", "external_id": "12706", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Solar 21 Renewable Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "city": "", "id": "905", "external_id": "12725", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Zenobe Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-02-01", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ourack", "city": "", "id": "906", "external_id": "12727", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vattenfall", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newburn Bridge Road - Battery Storage Facility", "city": "", "id": "907", "external_id": "12729", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power Storage Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barlow Road, Barlow Road - Battery Storage", "city": "", "id": "908", "external_id": "12734", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "city": "", "id": "909", "external_id": "12780", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balnacraig Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "city": "", "id": "910", "external_id": "12789", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "85", "power_mw": "85", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cirencester Solar Farm", "city": "", "id": "911", "external_id": "12791", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Warrington Borough Council / Statkraft", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2015-09-17", "start_construction": "2018-09-06", "start_operation": "2022-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "912", "external_id": "12803", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Armshead Farm, Armshead Road - Battery Energy Storage Facility", "city": "", "id": "913", "external_id": "12804", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "city": "", "id": "914", "external_id": "12815", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Clinton Devon Estates", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "city": "", "id": "915", "external_id": "12821", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ESB Asset Development UK Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "city": "", "id": "916", "external_id": "12823", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Elgin Energy Es Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bengrove Farm, Base Lane - Battery Storage", "city": "", "id": "917", "external_id": "12830", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Bengrove Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkton Energy Farm", "city": "", "id": "918", "external_id": "12876", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Kirkton Wind Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tomchrasky Estate Wind farm", "city": "", "id": "919", "external_id": "12877", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "E Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "St Michaels Road, Ditton Road - Battery Storage", "city": "", "id": "920", "external_id": "12904", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Shell Green Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "city": "", "id": "921", "external_id": "12909", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "J3 Business Park - Battery Energy Storage Facility", "city": "", "id": "922", "external_id": "12920", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Forepower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "923", "external_id": "12936", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coventry Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "city": "", "id": "924", "external_id": "12941", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Low Carbon Solar Park 20 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Long Pasture Farm, Little Stainton - Solar Farm", "city": "", "id": "925", "external_id": "12952", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Electric Works", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lowlands Farm - Battery Storage", "city": "", "id": "926", "external_id": "12959", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hillside Farm, Lancaster Road - Battery Storage", "city": "", "id": "927", "external_id": "12964", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Hamilton March", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Welkin Mill, Welkin Road - Battery Storage", "city": "", "id": "928", "external_id": "12982", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scawd Law Wind Farm", "city": "", "id": "929", "external_id": "13000", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Fred Olsen Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eccles Substation, Eccles - Battery Energy Storage System", "city": "", "id": "930", "external_id": "13003", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Eccles Grid Stability Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mount Pleasant Farm, Green Lane - Battery Storage", "city": "", "id": "931", "external_id": "13011", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Barton Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sunlight Storage", "city": "", "id": "932", "external_id": "65857", "state": "california", "country": "usa", "capacity_mwh": "920", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Sunlight Storage, LLC", "developer": "NextEra", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.803544", "long": "-115.401622", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/230mw-bess-comes-online-at-bureau-of-land-management-site-in-california/", "link2": "", "link3": "", "link4": ""}, {"name": "North Central Valley", "city": "", "id": "933", "external_id": "66208", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "132", "customer": "", "owner": "North Central Valley Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Buena Vista Energy LLC", "city": "", "id": "934", "external_id": "56446", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clairemont Energy Storage", "city": "", "id": "935", "external_id": "66266", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paradise Energy Storage", "city": "", "id": "936", "external_id": "66265", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Jicarilla Solar 1 LLC", "city": "", "id": "937", "external_id": "66163", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Repsol Renewables NA", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Crossett Power Management LLC", "city": "", "id": "938", "external_id": "66009", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "406", "power_mw": "203", "customer": "", "owner": "Crossett Power Management LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Revolution", "city": "", "id": "939", "external_id": "66170", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Crane 2 BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Flower Valley II", "city": "", "id": "940", "external_id": "66007", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "202", "power_mw": "101", "customer": "", "owner": "Flower Valley II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Swoose II", "city": "", "id": "941", "external_id": "66008", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "202", "power_mw": "101", "customer": "", "owner": "Swoose II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yaupon Solar Project (Hybrid)", "city": "", "id": "942", "external_id": "66216", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Yaupon Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barilla Solar", "city": "", "id": "943", "external_id": "58710", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Parowan Solar", "city": "", "id": "944", "external_id": "65823", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "116", "power_mw": "58", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Menifee Power Bank", "city": "", "id": "947", "external_id": "66494", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Nova Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sunlight Storage II", "city": "", "id": "948", "external_id": "66575", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Sunlight Storage II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Solar Blue", "city": "", "id": "949", "external_id": "63848", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "450", "power_mw": "225", "customer": "", "owner": "Westlands Solar Blue (OZ) Owner, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Proxima", "city": "", "id": "952", "external_id": "66270", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "324", "power_mw": "162", "customer": "", "owner": "Proxima Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chestnut", "city": "", "id": "953", "external_id": "63849", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "Chestnut Westside, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Grid Gwent Storage 1", "city": "", "id": "954", "external_id": "66409", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "Hecate Grid Gwent Storage 1, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaumont BESS", "city": "", "id": "955", "external_id": "66461", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Placerita ESS", "city": "", "id": "956", "external_id": "66462", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Baldy Mesa Solar & Storage", "city": "", "id": "957", "external_id": "66598", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stanton Battery Energy Storage", "city": "", "id": "958", "external_id": "66423", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "136", "power_mw": "68", "customer": "", "owner": "Wellhead Services, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "VESI Pomona", "city": "", "id": "960", "external_id": "50300", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI Pomona Energy Storage, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Melrose BESS", "city": "", "id": "961", "external_id": "66281", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pala Gomez Creek BESS", "city": "", "id": "962", "external_id": "66280", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Boulevard Energy Storage", "city": "", "id": "963", "external_id": "66279", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elliott Energy Storage", "city": "", "id": "964", "external_id": "66278", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BCE Los Alamitos 1", "city": "", "id": "965", "external_id": "66533", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Bright Canyon Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BCE Los Alamitos 2", "city": "", "id": "966", "external_id": "66532", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Bright Canyon Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aragon Energy Storage", "city": "", "id": "967", "external_id": "66431", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Aragon Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hemmingway BESS", "city": "", "id": "968", "external_id": "66325", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Black Mesa BESS", "city": "", "id": "969", "external_id": "66326", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grey Fox Wind", "city": "", "id": "970", "external_id": "65939", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Grey Fox Wind", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mulligan Solar, LLC", "city": "", "id": "971", "external_id": "65349", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Mulligan Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Buena Vista Energy Center", "city": "", "id": "974", "external_id": "66408", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Buena Vista Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yellow Pine Solar", "city": "", "id": "975", "external_id": "66357", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "96", "power_mw": "48", "customer": "", "owner": "Yellow Pine Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Springwater Solar, LLC", "city": "", "id": "976", "external_id": "65900", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Springwater Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Salt City Solar Project - Hybrid", "city": "", "id": "977", "external_id": "65302", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Salt City Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Energy Ramsey Storage", "city": "", "id": "978", "external_id": "66414", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "Hecate Energy Ramsey Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ash Creek BESS", "city": "", "id": "979", "external_id": "66391", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "612", "power_mw": "306", "customer": "", "owner": "ACTX BESS Project LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "OCI SunRoper", "city": "", "id": "980", "external_id": "65893", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "520", "power_mw": "260", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Five Wells Solar Center - Hybrid", "city": "", "id": "981", "external_id": "66420", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "518", "power_mw": "259", "customer": "", "owner": "Five Wells Solar Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Grid East Valley Storage", "city": "", "id": "982", "external_id": "66411", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "510", "power_mw": "255", "customer": "", "owner": "Hecate Grid East Valley Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tidwell Prairie Storage 1", "city": "", "id": "983", "external_id": "66337", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Tidwell Prairie", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "OCI Hillsboro", "city": "", "id": "984", "external_id": "66401", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 7 BESS 1", "city": "", "id": "985", "external_id": "66297", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 7 BESS 2", "city": "", "id": "986", "external_id": "66298", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Crane 2 BESS 2", "city": "", "id": "987", "external_id": "66300", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton BESS 2", "city": "", "id": "988", "external_id": "66303", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Uvalde 2 BESS 2", "city": "", "id": "989", "external_id": "66305", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peregrine BESS 1", "city": "", "id": "990", "external_id": "66301", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peregrine BESS 2", "city": "", "id": "991", "external_id": "66302", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "St. Gall Energy Storage I", "city": "", "id": "992", "external_id": "66336", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "St. Gall Energy Storage I", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 3 BESS 2", "city": "", "id": "993", "external_id": "66293", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 4 BESS", "city": "", "id": "994", "external_id": "66294", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 5 BESS 1", "city": "", "id": "995", "external_id": "66295", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 5 BESS 2", "city": "", "id": "996", "external_id": "66296", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Callisto I Energy Center", "city": "", "id": "997", "external_id": "66338", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Callisto I Energy Center", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bexar ESS", "city": "", "id": "998", "external_id": "66400", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peeler Solar, LLC", "city": "", "id": "999", "external_id": "65932", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Peeler Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gaia Hybrid", "city": "", "id": "1000", "external_id": "66342", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "152", "power_mw": "76", "customer": "", "owner": "Samsung Solar Energy 2, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Uvalde 2 BESS 1", "city": "", "id": "1001", "external_id": "66304", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eagle Springs Hybrid", "city": "", "id": "1002", "external_id": "66341", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Samsung Solar Energy 2, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "MRG Goody Solar Project Hybrid", "city": "", "id": "1003", "external_id": "66390", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "MRG Goody Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grizzly Ridge Solar", "city": "", "id": "1004", "external_id": "66410", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Grizzly Ridge Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Powells Creek Solar - Hybrid", "city": "", "id": "1005", "external_id": "65305", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Powells Creek Farm Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sunnybrook Solar Project - Hybrid", "city": "", "id": "1006", "external_id": "65307", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Sunnybrook Farm Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "McFarland B Solar and Storage", "city": "", "id": "1008", "external_id": "66637", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "McFarland A Solar and Storage", "city": "", "id": "1009", "external_id": "66636", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Saint Energy Storage II LLC", "city": "", "id": "1010", "external_id": "66716", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Saint Energy Storage II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cald BESS", "city": "", "id": "1012", "external_id": "66617", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Cald BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hanford BESS", "city": "", "id": "1013", "external_id": "66660", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Hanford BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Henrietta BESS", "city": "", "id": "1014", "external_id": "66661", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Henrietta BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Malaga BESS", "city": "", "id": "1015", "external_id": "66659", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "194", "power_mw": "97", "customer": "", "owner": "Malaga BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Inland Empire Energy Storage", "city": "", "id": "1016", "external_id": "66726", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tumbleweed Energy Storage", "city": "", "id": "1017", "external_id": "66666", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Tumbleweed Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Resurgence Solar II", "city": "", "id": "1018", "external_id": "66620", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Resurgence Solar II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BIA BESS", "city": "", "id": "1019", "external_id": "66662", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "64", "power_mw": "32", "customer": "", "owner": "Hanford BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Ford Flat", "city": "", "id": "1020", "external_id": "66669", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "West Ford Flat Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bear Canyon", "city": "", "id": "1021", "external_id": "66650", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "13", "customer": "", "owner": "Bear Canyon Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lake Mabel Storage", "city": "", "id": "1022", "external_id": "66641", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wimauma Storage", "city": "", "id": "1023", "external_id": "66640", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vermillion Rise Solar", "city": "", "id": "1024", "external_id": "65935", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Vermillion Rise Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KCE NY 10, LLC", "city": "", "id": "1025", "external_id": "66682", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alfred Oaks Solar, LLC", "city": "", "id": "1026", "external_id": "66675", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Alfred Oaks Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cold Creek Solar", "city": "", "id": "1027", "external_id": "66674", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Cold Creek Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wolf Tank Storage", "city": "", "id": "1028", "external_id": "66616", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Wolf Tank Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coati Solar, LLC", "city": "", "id": "1029", "external_id": "66693", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "280", "power_mw": "140", "customer": "", "owner": "Coati Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bright Arrow Solar, LLC", "city": "", "id": "1030", "external_id": "66688", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "206", "power_mw": "103", "customer": "", "owner": "Bright Arrow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brazos Bend BESS, LLC", "city": "", "id": "1031", "external_id": "66690", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Brazos Bend BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Seven Flags BESS LLC", "city": "", "id": "1032", "external_id": "66689", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Seven Flags BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holly Branch Solar, LLC", "city": "", "id": "1033", "external_id": "66692", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Holly Branch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Briggs Solar, LLC", "city": "", "id": "1034", "external_id": "66691", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Briggs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SR McNeal", "city": "", "id": "1035", "external_id": "66925", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "SR McNeal, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Raceway Solar & Storage", "city": "", "id": "1036", "external_id": "66773", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bottleneck Energy Storage", "city": "", "id": "1037", "external_id": "66757", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "VESI 12 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elevate Pier S", "city": "", "id": "1038", "external_id": "66787", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Pier S Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Estrella Solar & Storage", "city": "", "id": "1039", "external_id": "66772", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "56", "power_mw": "28", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Baldy Mesa 2_Silver Peak Hybrid", "city": "", "id": "1040", "external_id": "66885", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elevate Middletown", "city": "", "id": "1041", "external_id": "66786", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "550", "power_mw": "275", "customer": "", "owner": "Elevate Middletown, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KCE CT 1, LLC", "city": "", "id": "1042", "external_id": "66879", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "210", "power_mw": "105", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "MacDill Storage", "city": "", "id": "1043", "external_id": "66869", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dover Solar", "city": "", "id": "1044", "external_id": "66129", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pike County Energy Storage", "city": "", "id": "1045", "external_id": "66881", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Indianapolis Power & Light Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Justin Court Energy Storage", "city": "", "id": "1046", "external_id": "66758", "state": "new jersey", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI 23 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sky Ranch Solar and Storage", "city": "", "id": "1047", "external_id": "66814", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Sky Ranch Solar and Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Reid Gardner", "city": "", "id": "1048", "external_id": "2324", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "440", "power_mw": "220", "customer": "", "owner": "Nevada Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bonanza Solar and Storage Project", "city": "", "id": "1049", "external_id": "66908", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "390", "power_mw": "195", "customer": "", "owner": "EDF Renewables Development, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Grid Intrepid", "city": "", "id": "1050", "external_id": "66911", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Hecate Grid Intrepid 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KCE NY 29, LLC", "city": "", "id": "1051", "external_id": "66862", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elevate Arthur Kill", "city": "", "id": "1052", "external_id": "66785", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "GB Arthur Kill Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GulfStar Power, LLC", "city": "", "id": "1053", "external_id": "66871", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "GulfStar Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Borden County BESS", "city": "", "id": "1054", "external_id": "66804", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Borden County Battery Energy Storage System LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Myrtle Storage", "city": "", "id": "1055", "external_id": "66913", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Myrtle Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Danish Fields Storage", "city": "", "id": "1056", "external_id": "66916", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Danish Fields Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lupinus Solar 2, LLC", "city": "", "id": "1057", "external_id": "66896", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "244", "power_mw": "122", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Estonian Solar Project, LLC", "city": "", "id": "1058", "external_id": "66872", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Enel Green Power Estonian Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ables Springs Solar & Storage", "city": "", "id": "1059", "external_id": "66905", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Ables Springs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lupinus Solar 1, LLC", "city": "", "id": "1060", "external_id": "66895", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "166", "power_mw": "83", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fence Post Solar Hybrid Project, LLC", "city": "", "id": "1061", "external_id": "66801", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "144", "power_mw": "72", "customer": "", "owner": "Fence Post Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Midpoint Solar, LLC", "city": "", "id": "1062", "external_id": "66897", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "104", "power_mw": "52", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Indigo Solar & Storage", "city": "", "id": "1063", "external_id": "66891", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "GGS Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Albatross Solar, LLC", "city": "", "id": "1064", "external_id": "66894", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton County BESS", "city": "", "id": "1065", "external_id": "64811", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "24", "customer": "", "owner": "VESI Upton County BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Bay City LLC", "city": "", "id": "1066", "external_id": "66930", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Bay City LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Alamo LLC", "city": "", "id": "1067", "external_id": "66929", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Alamo LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Harlingen II LLC", "city": "", "id": "1068", "external_id": "66933", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Harlingen II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Mercedes LLC", "city": "", "id": "1069", "external_id": "66926", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Mercedes LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Mission LLC", "city": "", "id": "1070", "external_id": "66927", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Mission LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Santa Rosa LLC", "city": "", "id": "1071", "external_id": "66928", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Santa Rosa LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Elsa LLC", "city": "", "id": "1072", "external_id": "66931", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Elsa LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Los Fresnos LLC", "city": "", "id": "1073", "external_id": "66932", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Los Fresnos LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Rio Grande I LLC", "city": "", "id": "1074", "external_id": "66934", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Rio Grande I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Rio Grande II LLC", "city": "", "id": "1075", "external_id": "66935", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Rio Grande II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Garn Fach Wind Farm", "city": "", "id": "1076", "external_id": "7705", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Larks Green Solar Farm", "city": "", "id": "1077", "external_id": "8052", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Enso Energy / Iron Acton Green", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Windmill Farm Solar Farm ", "city": "", "id": "1078", "external_id": "8348", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Carrs - Energy storage facility", "city": "", "id": "1079", "external_id": "9207", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Meadow Farm Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Pargillis - Battery Storage", "city": "", "id": "1080", "external_id": "9564", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Renewable Connections Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thurleigh Road - Battery Energy Storage", "city": "", "id": "1081", "external_id": "9651", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "69", "power_mw": "69", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "city": "", "id": "1082", "external_id": "9796", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tontine Road - Battery Energy Storage System", "city": "", "id": "1083", "external_id": "9819", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "Coriolis Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Common Farm - Solar Farm & Battery Storage", "city": "", "id": "1084", "external_id": "9877", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Banks Renewable", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Post Farm, Lytchett Minster - Battery Energy Storage", "city": "", "id": "1085", "external_id": "10291", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "S4N Lytchett Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Huncoat Power Station - Battery Storage", "city": "", "id": "1086", "external_id": "10516", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Benthead Farm - Solar Farm & Battery Storage", "city": "", "id": "1087", "external_id": "10542", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "31", "power_mw": "31", "customer": "", "owner": "Locogen Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Windyhill Battery Storage Facility", "city": "", "id": "1088", "external_id": "10596", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Energy GridPower Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Earraghail Renewable Energy Development", "city": "", "id": "1089", "external_id": "10712", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Smithyard Lane - Battery Storage", "city": "", "id": "1090", "external_id": "10766", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Conrad Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ballingall Farm, Leslie - Battery Energy Storage System", "city": "", "id": "1091", "external_id": "10825", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "43", "power_mw": "43", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bolney Substation - Battery Storage", "city": "", "id": "1092", "external_id": "10843", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "264", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Station Lane, Burton Leonard - Battery Energy Storage System", "city": "", "id": "1093", "external_id": "10893", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "33", "power_mw": "33", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Law Of Doune Road, Macduff - Battery Storage", "city": "", "id": "1094", "external_id": "10894", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hawthorn Grid Site - Battery Storage", "city": "", "id": "1095", "external_id": "10896", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Burton Solar Project", "city": "", "id": "1096", "external_id": "10917", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Island Green Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coalburn II Energy - Battery Storage", "city": "", "id": "1097", "external_id": "11034", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Well Street - Battery Storage", "city": "", "id": "1098", "external_id": "11473", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Larkfleet Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kellwood Road - Battery Storage", "city": "", "id": "1099", "external_id": "11545", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Geocore Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holmston Road - Battery Storage Facility", "city": "", "id": "1100", "external_id": "11679", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy Systems Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "city": "", "id": "1101", "external_id": "11680", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "240", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Haughend Farm - Alyth Battery Energy Storage System", "city": "", "id": "1102", "external_id": "11858", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "450", "power_mw": "450", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eccles Battery Energy Storage System", "city": "", "id": "1103", "external_id": "11867", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Weaver Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Middleton Road - Linwood Battery Energy Storage System", "city": "", "id": "1104", "external_id": "11868", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "69", "power_mw": "69", "customer": "", "owner": "Bluestone Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Burton Power Station, North Road - Battery Storage", "city": "", "id": "1105", "external_id": "11928", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "West Burton Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Normanton Energy Reserve - Battery Storage", "city": "", "id": "1106", "external_id": "11988", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Exagen SPVO2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Highfield Energy Park", "city": "", "id": "1107", "external_id": "12312", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "city": "", "id": "1108", "external_id": "12361", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Libra Energy Stability Project - Battery Energy Storage", "city": "", "id": "1109", "external_id": "12443", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Lightrock Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thorpe Marsh Power Station - Battery Energy Storage", "city": "", "id": "1110", "external_id": "12453", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1450", "power_mw": "1450", "customer": "", "owner": "Banks Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackdyke Farm, Blackford - Battery Storage", "city": "", "id": "1111", "external_id": "12710", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "A981 Fraserburgh - Battery Energy Storage", "city": "", "id": "1112", "external_id": "12711", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Fraserburgh Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "city": "", "id": "1113", "external_id": "12760", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "city": "", "id": "1114", "external_id": "12820", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Noriker Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Staythorpe Road, Averham - Battery Storage", "city": "", "id": "1115", "external_id": "12893", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "SSE Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coldharbour, Chickerell - Battery Storage Facility", "city": "", "id": "1116", "external_id": "12967", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "23 Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drumore Cottage, Swordale - Battery Storage", "city": "", "id": "1117", "external_id": "12983", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Fig Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walpole Sub Station, Walpole Bank - Battery Storage", "city": "", "id": "1118", "external_id": "13045", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Henry Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Huncoat Power Station - Battery Storage Facility", "city": "", "id": "1119", "external_id": "13080", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "city": "", "id": "1120", "external_id": "13087", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Scot Stability Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pershore Lane, Tibberton - Battery Energy Storage System", "city": "", "id": "1121", "external_id": "13096", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Sirius Renewable Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordhouse Lane - Battery Energy Storage System", "city": "", "id": "1122", "external_id": "13108", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "FPC (Electric Land) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newburgh Road, Abernethy - Energy Storage", "city": "", "id": "1123", "external_id": "13111", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "P & M Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clashindarroch Wind Farm Extension", "city": "", "id": "1124", "external_id": "13117", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Infinergy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hollins Lane - Battery Energy Storage", "city": "", "id": "1125", "external_id": "13144", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Linton Court Farm, Highnam - Battery storage", "city": "", "id": "1126", "external_id": "13145", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "STOR 136 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "city": "", "id": "1127", "external_id": "13225", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "43", "power_mw": "43", "customer": "", "owner": "Falkirk Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "city": "", "id": "1128", "external_id": "13236", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Quantans Hill Wind Farm", "city": "", "id": "1129", "external_id": "13238", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vattenfall Wind Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "city": "", "id": "1130", "external_id": "13246", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Reliance Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beechwood Farm, Hodgetts Lane - Battery Storage", "city": "", "id": "1131", "external_id": "13297", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Enso Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peel Road, Westby With Plumptons - Battery Storage", "city": "", "id": "1132", "external_id": "13300", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fairways Business Park - Battery Storage ", "city": "", "id": "1133", "external_id": "13318", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carrington Power Station, Manchester Road - Battery Storage", "city": "", "id": "1134", "external_id": "13362", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1040", "power_mw": "1040", "customer": "", "owner": "Wainstones Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lichfield Road, Watton Lane - Battery Storage", "city": "", "id": "1135", "external_id": "13369", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo ES Water Orton Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hollydale, Buildwas Road - Battery Storage", "city": "", "id": "1136", "external_id": "13410", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Telford Four Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Golf Road - Battery Energy Storage", "city": "", "id": "1137", "external_id": "13459", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Cragside Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "city": "", "id": "1138", "external_id": "13461", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Conrad Energy ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bath Mews, Minsterley - Battery Storage Facility", "city": "", "id": "1139", "external_id": "13480", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kemsley Energy Park Battery Storage", "city": "", "id": "1140", "external_id": "13489", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "120", "customer": "", "owner": "FPC Electric Land limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "city": "", "id": "1141", "external_id": "13550", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hickling Lane, Swainsthorpe -Battery Storage", "city": "", "id": "1142", "external_id": "13560", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "114", "power_mw": "114", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Spennymoor Greener Grid Park", "city": "", "id": "1143", "external_id": "13576", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "city": "", "id": "1144", "external_id": "13607", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Levedale Road, Levedale - Battery Energy Storage", "city": "", "id": "1145", "external_id": "13615", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walpole Bank - Battery Energy Storage Facility", "city": "", "id": "1146", "external_id": "13639", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Field Devco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "city": "", "id": "1147", "external_id": "13643", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "city": "", "id": "1148", "external_id": "13644", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1400", "power_mw": "1400", "customer": "", "owner": "Banks Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "city": "", "id": "1149", "external_id": "13655", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "GAM Capital Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Astwood Lane, Feckenham - Battery Storage", "city": "", "id": "1150", "external_id": "13707", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coxmoor Wood, Crondall Road - Battery Storage", "city": "", "id": "1151", "external_id": "13728", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Fleet Green Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sale Golf Club, Golf Road - Battery Storage", "city": "", "id": "1152", "external_id": "13731", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "247 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tofts Lane, Hunshelf - Battery Storage", "city": "", "id": "1153", "external_id": "13733", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Harmony HS (JV) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Welkin Road, Bredbury - Battery Storage System", "city": "", "id": "1154", "external_id": "13740", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fair Park Solar Farm", "city": "", "id": "1155", "external_id": "13761", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Downing Renewable Developments Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "city": "", "id": "1156", "external_id": "13774", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Conrad Energy (Developments) Ii Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Melvich Bay - Melvich Wind Energy Hub", "city": "", "id": "1157", "external_id": "13826", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bolney - Battery Storage", "city": "", "id": "1158", "external_id": "13880", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Bolney Green Energy Hub Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "city": "", "id": "1159", "external_id": "13976", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Marsh Lane, Gowhole - Energy Storage System", "city": "", "id": "1160", "external_id": "13982", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "city": "", "id": "1161", "external_id": "13986", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Drumlithie Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pound Road, Hawkchurch - Battery Energy Storage System", "city": "", "id": "1162", "external_id": "14016", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "120", "customer": "", "owner": "Enso Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Abhainn Dubh Wind Farm", "city": "", "id": "1163", "external_id": "14039", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "E Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "J3 Business Park - Battery Storage Facility", "city": "", "id": "1164", "external_id": "14054", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Forepower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eccles II Substation - Battery Energy Storage System", "city": "", "id": "1165", "external_id": "14058", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Intergen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lower Larks Farm - Battery storage", "city": "", "id": "1166", "external_id": "14076", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "RE Projects Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Larks Lane, Iron Acton - Battery Storage Facility", "city": "", "id": "1167", "external_id": "14091", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "HD000ACT Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Quarterland Road, Islandmagee - Battery Storage", "city": "", "id": "1168", "external_id": "14117", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Solo Renewables Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Doogary Road, Omagh - Battery Storage", "city": "", "id": "1169", "external_id": "14125", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Omagh BES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ash Farm, Titchfield Lane - Battery Storage", "city": "", "id": "1170", "external_id": "14145", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Botley Energy Reserve 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bishopmill - Battery Energy Storage", "city": "", "id": "1171", "external_id": "14191", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clough Road - Battery Energy System", "city": "", "id": "1172", "external_id": "14225", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "GAM Capital Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Frome Power, Styles Close - Energy Storage Facility", "city": "", "id": "1173", "external_id": "14227", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Trina Solar UK Hold Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Collie Battery Stage 1", "city": "", "id": "1174", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "877", "estimate_mwh": "", "power_mw": "219", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31604", "long": "116.289605", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "link2": "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/", "link3": "", "link4": ""}, {"name": "Chingjia Energy", "city": "", "id": "1175", "external_id": "", "state": "", "country": "taiwan", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Chingjia Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.222065", "long": "120.945036", "coords_hint": "-2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1693770142554189983", "link2": "", "link3": "", "link4": ""}, {"name": "Gigafactory Texas", "city": "", "id": "1176", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "125", "customer": "", "owner": "Tesla", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "68", "status": "operation", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.230756", "long": "-97.615973", "coords_hint": "1", "use_case": "", "notes": "used date of tweet for the operation start date", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1681503667030212608", "link2": "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "link3": "https://twitter.com/SawyerMerritt/status/1682834256928571392", "link4": "https://x.com/Tesla_Megapack/status/1791530954261172681"}, {"name": "Scarlet II Hybrid", "city": "", "id": "1177", "external_id": "66951", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "EDPR Scarlet II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Golden Field Solar III, LLC", "city": "", "id": "1178", "external_id": "63859", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "294", "power_mw": "147", "customer": "", "owner": "Golden Field Solar III, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Northern Orchard Solar PV, LLC", "city": "", "id": "1179", "external_id": "67039", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "184", "power_mw": "92", "customer": "", "owner": "Northern Orchard Solar PV, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sagebrush Solar 2 ESS 59", "city": "", "id": "1180", "external_id": "66950", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "118", "power_mw": "59", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lockhart ESS, LLC", "city": "", "id": "1181", "external_id": "66946", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "45", "customer": "", "owner": "Terra-Gen Operating Co-Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sagebrush Solar 2 ESS 40", "city": "", "id": "1182", "external_id": "66949", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "McLauchin", "city": "", "id": "1183", "external_id": "67041", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Archie Horne", "city": "", "id": "1184", "external_id": "67040", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Butler", "city": "", "id": "1185", "external_id": "67042", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yellow Pine II", "city": "", "id": "1186", "external_id": "67091", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "106", "power_mw": "53", "customer": "", "owner": "Yellow Pine Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Iron Belt", "city": "", "id": "1187", "external_id": "67059", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Iron Belt Energy Storage Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Longbow BESS, LLC", "city": "", "id": "1188", "external_id": "67083", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "348", "power_mw": "174", "customer": "", "owner": "Longbow BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Copperhead Solar, LLC", "city": "", "id": "1189", "external_id": "67019", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "National Grid Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Second Division Solar", "city": "", "id": "1190", "external_id": "65981", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Starr Solar Ranch", "city": "", "id": "1191", "external_id": "65975", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Leake Lane, Ratcliffe - Battery Storage", "city": "", "id": "1192", "external_id": "12464", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "600", "customer": "", "owner": "Sandbrook Capital BES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "city": "", "id": "1193", "external_id": "12496", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pulse Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barfield Lane, Reepham - Battery Energy Storage System", "city": "", "id": "1194", "external_id": "12600", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "53", "power_mw": "53", "customer": "", "owner": "Fiskerton Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Chickerell Court Farm - Battery Energy Storage System", "city": "", "id": "1195", "external_id": "12651", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Old Vicarage, Reedley - Battery Storage", "city": "", "id": "1196", "external_id": "12767", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "European Energy A/S", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shetland Battery Energy Storage System", "city": "", "id": "1197", "external_id": "12856", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rigifa Cove Road - Battery Storage", "city": "", "id": "1198", "external_id": "12970", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Source Galileo Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kinmuck Battery Energy Storage", "city": "", "id": "1199", "external_id": "13001", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "105", "power_mw": "105", "customer": "", "owner": "Kinmuck Energy Storage Limited / Island Green Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "city": "", "id": "1200", "external_id": "13217", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Boom Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "city": "", "id": "1201", "external_id": "13310", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "city": "", "id": "1202", "external_id": "13323", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Learielaw Farm, Learielaw - Battery Energy Storage", "city": "", "id": "1203", "external_id": "13368", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "city": "", "id": "1204", "external_id": "13449", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newton Farm, Westburn Road - Battery Storage Facility", "city": "", "id": "1205", "external_id": "13450", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Bluefield Renewable Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Longcroft Wind Farm", "city": "", "id": "1206", "external_id": "13539", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Energy Systems", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Butts Field, Mill Lane - Battery Storage", "city": "", "id": "1207", "external_id": "13573", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Ecotricity Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "city": "", "id": "1208", "external_id": "13595", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Epsilon Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dolphingstone Farm - Battery Energy Storage System", "city": "", "id": "1209", "external_id": "13618", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "63", "power_mw": "63", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Persley Croft - Battery Storage", "city": "", "id": "1210", "external_id": "13684", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RE Projects Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "city": "", "id": "1211", "external_id": "13695", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Belasis Avenue - Battery Storage", "city": "", "id": "1212", "external_id": "13850", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Story Construction Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bradley Road - Battery Energy Storage System", "city": "", "id": "1213", "external_id": "13863", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Renewable Connections Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "city": "", "id": "1214", "external_id": "13949", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Infinergy Limited / Boralex", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "city": "", "id": "1215", "external_id": "13985", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Queequeg Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bluebell Wood Solar Farm & Battery Storage", "city": "", "id": "1216", "external_id": "13989", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon UK Solar Investment Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Weston Lane - Battery Storage Facility", "city": "", "id": "1217", "external_id": "14005", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Balk, Almholme - Energy Storage System", "city": "", "id": "1218", "external_id": "14061", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1025", "power_mw": "1025", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Illeybrook Farm - Battery Energy Storage", "city": "", "id": "1219", "external_id": "14064", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Net Zero Eleven Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chillington Estate, Chillington Park - Battery Storage", "city": "", "id": "1220", "external_id": "14088", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Elgin Energy Esco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Enoch Hill, Dalmellington - Battery Storage", "city": "", "id": "1221", "external_id": "14090", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "11", "power_mw": "11", "customer": "", "owner": "RWE Renewables Uk Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wardlaw Wood Windfarm - Battery Storage", "city": "", "id": "1222", "external_id": "14231", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Community Windpower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Houston Solar PV Farm & Energy Storage Facility", "city": "", "id": "1223", "external_id": "14294", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "The Old Rectory", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Knockodhar Wind Farm", "city": "", "id": "1224", "external_id": "14296", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "REG Knockodhar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grendon Lakes, Grendon - Battery Storage Facility", "city": "", "id": "1225", "external_id": "14321", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Denfield Farm", "city": "", "id": "1226", "external_id": "14341", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Seahills Properties Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bywater, Kippax - Battery Energy Storage", "city": "", "id": "1227", "external_id": "14362", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Barnsdale Solar Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "city": "", "id": "1228", "external_id": "14373", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kintore Substation, Leylodge - Battery Energy Storage", "city": "", "id": "1229", "external_id": "14374", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "XRE Gamma Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Seath Road, Rutherglen - Battery Storage", "city": "", "id": "1230", "external_id": "14378", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fanny House Farm, Bay Gateway - Battery Storage", "city": "", "id": "1231", "external_id": "14386", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "940", "power_mw": "940", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Boldon Substation - Battery Energy Storage", "city": "", "id": "1232", "external_id": "14408", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "city": "", "id": "1233", "external_id": "14461", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Connections Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ebstree Road, Trysull - Battery Energy Storage", "city": "", "id": "1234", "external_id": "14497", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Bengrove Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "1235", "external_id": "14510", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo ES Berkswell Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Meiklelaught Farm - Battery Storage", "city": "", "id": "1236", "external_id": "14525", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dunside Wind Farm", "city": "", "id": "1237", "external_id": "14531", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bodinglee Wind Farm", "city": "", "id": "1238", "external_id": "14532", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "106", "power_mw": "106", "customer": "", "owner": "Banks Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rivox Wind Farm - Wind farm", "city": "", "id": "1239", "external_id": "14533", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "city": "", "id": "1240", "external_id": "14597", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walshaw House, Regent Street - Battery Energy Storage", "city": "", "id": "1241", "external_id": "14625", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "R B Business Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "city": "", "id": "1242", "external_id": "14638", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Chiltern Renewables Hockliffe Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "New Barn Road - Battery Energy Storage Facility", "city": "", "id": "1243", "external_id": "14650", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Aton Energy Development (Northfleet) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coopers Lane, Kirkby - Battery Storage Facility", "city": "", "id": "1244", "external_id": "14670", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "city": "", "id": "1245", "external_id": "14687", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Renewables (merged with Pivot Power)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "city": "", "id": "1246", "external_id": "14691", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tofts - Battery Storage", "city": "", "id": "1247", "external_id": "14706", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Telford Three Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barlow Road, Barlow Road - Battery Storage", "city": "", "id": "1248", "external_id": "14715", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wilton International, Greystones Road - Phase 1", "city": "", "id": "1249", "external_id": "14729", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "Sembcorp Utilities (UK) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Murton Way - Battery Energy Storage", "city": "", "id": "1250", "external_id": "14759", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "First Way Solar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newarthill Energy Park", "city": "", "id": "1251", "external_id": "14763", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Geocore Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kingston Road, Slimbridge - Battery Storage", "city": "", "id": "1252", "external_id": "14882", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Relay Slimbridge Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wallerscote Limebeds - Battery Energy Storage", "city": "", "id": "1253", "external_id": "14888", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Infinis Solar Developments Limited / Green Earth Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Orrell Street Battery Energy Storage Facility", "city": "", "id": "1254", "external_id": "14892", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Enzygo Limited Environmental Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "city": "", "id": "1255", "external_id": "14932", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "180", "power_mw": "180", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Junction 27, Westleigh - Battery Storage", "city": "", "id": "1256", "external_id": "14935", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Clearstone Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cargo Road, Cargo - Battery Storage", "city": "", "id": "1257", "external_id": "14939", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Warren Lane, Bramham - Battery Energy Storage", "city": "", "id": "1258", "external_id": "14954", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Hale Fen - Solar Farm", "city": "", "id": "1259", "external_id": "14955", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "AGR Solar 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Old Trent Road, Beckingham - Battery Storage Facility ", "city": "", "id": "1260", "external_id": "14956", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Recell Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fox Cover Road - Battery Energy Storage", "city": "", "id": "1261", "external_id": "14968", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ditcher Law Wind Farm", "city": "", "id": "1262", "external_id": "14996", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "E Power Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackdyke Farm, Blackford - Battery Storage", "city": "", "id": "1263", "external_id": "15005", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Severn Road, Hallen - Battery Storage Facility", "city": "", "id": "1264", "external_id": "15027", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "EL Avonmouth Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stocking Lane - Battery Energy Facility", "city": "", "id": "1265", "external_id": "15082", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Nel Tiger", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Heron Solar Farm & Battery Storage", "city": "", "id": "1266", "external_id": "15084", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "JBM Solar Projects 38 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hare Craig Windfarm", "city": "", "id": "1267", "external_id": "15101", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "EnergieKontor UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "city": "", "id": "1268", "external_id": "15127", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "W Rigby & Sons", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tanners Lane - Battery Energy Storage System", "city": "", "id": "1269", "external_id": "15128", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Tag Energy Development UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aikengall, Innerwick - Battery Energy Storage", "city": "", "id": "1270", "external_id": "15141", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Redstone Rig Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Red Barn - Solar Farm & Battery Storage", "city": "", "id": "1271", "external_id": "15146", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coolkeeragh - Battery Storage", "city": "", "id": "1272", "external_id": "15151", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "140", "customer": "", "owner": "Coolkeeragh BES Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Flatterton Farm, Flatterton Road - Battery Storage", "city": "", "id": "1273", "external_id": "15154", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Big Battery (Flatterton Farm) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Monk Fryston Battery Storage", "city": "", "id": "1274", "external_id": "15164", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "320", "power_mw": "320", "customer": "", "owner": "SSE Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wareham Road, Scouse Farm - Battery Storage", "city": "", "id": "1275", "external_id": "15165", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Ylem Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cloud Hill Wind Farm", "city": "", "id": "1276", "external_id": "15174", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "34", "customer": "", "owner": "Blue Energy Company / BayWa r.e. UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vale of Leven Wind Farm", "city": "", "id": "1277", "external_id": "15175", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Coriolis Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kilmarnock Battery Energy Storage System", "city": "", "id": "1278", "external_id": "15176", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Intergen Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "1279", "external_id": "15230", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coventry Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rock Farm - Solar Farm", "city": "", "id": "1280", "external_id": "15248", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "city": "", "id": "1281", "external_id": "15263", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Enso Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "New Road, Featherstone - Battery Storage", "city": "", "id": "1282", "external_id": "15297", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Chiltern Renewables Hockliffe Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Battery Energy Storage Facility in Londonderry", "city": "", "id": "1283", "external_id": "15303", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "34", "customer": "", "owner": "Heron Storage Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lowfields Energy Storage Project", "city": "", "id": "1284", "external_id": "15304", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chapel Lane - Battery Energy Storage System", "city": "", "id": "1285", "external_id": "15308", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coylton Greener Grid Park", "city": "", "id": "1286", "external_id": "15312", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Westfield Road, Carlton - Battery Storage", "city": "", "id": "1287", "external_id": "15338", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Firma Vogt Solar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Midland Road - Battery Energy Storage", "city": "", "id": "1288", "external_id": "15343", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Unknown", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "city": "", "id": "1289", "external_id": "15375", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newlands Hill Wind Energy Hub", "city": "", "id": "1290", "external_id": "15383", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "136", "power_mw": "136", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ash Tree Solar Farm & Battery Storage", "city": "", "id": "1291", "external_id": "15397", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Low Carbon Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "city": "", "id": "1292", "external_id": "15401", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "city": "", "id": "1293", "external_id": "15417", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Auchentiber Road - Battery Energy Storage System", "city": "", "id": "1294", "external_id": "15425", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "700", "customer": "", "owner": "Apatura GPC 700 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Burcot Solar Farm", "city": "", "id": "1295", "external_id": "15444", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Ethical Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "city": "", "id": "1296", "external_id": "15446", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Net Zero Twelve Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holt Road - Battery Energy Storage", "city": "", "id": "1297", "external_id": "15470", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penrhos Works - Battery Energy Storage System", "city": "", "id": "1298", "external_id": "15472", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "Anglesey Land Holdings Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Claydon Battery Energy Storage", "city": "", "id": "1299", "external_id": "15501", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brockworth Road - Battery Storage System", "city": "", "id": "1300", "external_id": "15518", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "1301", "external_id": "15544", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "126", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Electricity Substation, Bardarroch - Battery Energy Storage", "city": "", "id": "1302", "external_id": "15569", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Toddington Services, Hipsey Spinney - Battery Storage", "city": "", "id": "1303", "external_id": "15573", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "250", "customer": "", "owner": "Kona Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Caterham Bypass - Battery Energy Storage", "city": "", "id": "1304", "external_id": "15574", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Ylem Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "city": "", "id": "1305", "external_id": "15599", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Windel Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ipswich Road Cardiff - Battery Storage", "city": "", "id": "1306", "external_id": "15610", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "93", "power_mw": "93", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beehive Energy Storage", "city": "", "id": "1307", "external_id": "67184", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Beehive Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mohave Energy - Hybrid", "city": "", "id": "1308", "external_id": "67178", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Mohave Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paulsell", "city": "", "id": "1309", "external_id": "67092", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Crow Creek Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Santee BESS", "city": "", "id": "1310", "external_id": "67118", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dover Energy Storage", "city": "", "id": "1311", "external_id": "67120", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KRS I Anahola Solar Hybrid", "city": "", "id": "1312", "external_id": "58639", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Kauai Island Utility Cooperative", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KRS II Koloa Solar", "city": "", "id": "1313", "external_id": "58640", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Kauai Island Utility Cooperative", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Franklin Solar Hybrid", "city": "", "id": "1314", "external_id": "67190", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Franklin Solar Idaho", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Franklin Battery Storage", "city": "", "id": "1315", "external_id": "67183", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Powell Solar", "city": "", "id": "1316", "external_id": "67157", "state": "oregon", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rodeo Ranch Energy Storage", "city": "Reeves County", "id": "1317", "external_id": "67175", "state": "texas", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Rodeo Ranch Energy Storage, LLC", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-12", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.444304", "long": "-103.539476", "coords_hint": "3", "use_case": "", "notes": "guessed tesla as manufacturer from twitter link and the picture on the project webiste", "project_website": "https://www.rodeoranchenergystorage.com/", "link1": "https://twitter.com/SharifaDarani/status/1612314449045762048", "link2": "", "link3": "", "link4": ""}, {"name": "Hornshadow Solar II", "city": "", "id": "1318", "external_id": "67191", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Hornshadow Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hornshadow Solar", "city": "", "id": "1319", "external_id": "67189", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Hornshadow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paris Solar", "city": "", "id": "1320", "external_id": "65967", "state": "wisconsin", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Wisconsin Electric Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Swanbank", "city": "Ipswich", "id": "1321", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "", "developer": "Clean Co", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "cost_million": "330", "cost_currency": "USD", "cost_incl_solar": "", "lat": "-27.649131", "long": "152.814807", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1759460910530265090", "link2": "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/", "link3": "", "link4": ""}, {"name": "Scatter Wash BESS", "city": "Phoenix", "id": "1322", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "1020", "estimate_mwh": "", "power_mw": "255", "customer": "", "owner": "", "developer": "Strata Clean Energy", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "500", "cost_currency": "USD", "cost_incl_solar": "", "lat": "33.685402", "long": "-112.125062", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1748500029197726146", "link2": "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/", "link3": "", "link4": ""}, {"name": "Eleven Mile Solar Center", "city": "", "id": "1323", "external_id": "66263", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Eleven Mile Solar Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sun Streams 4", "city": "", "id": "1324", "external_id": "67291", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Sun Streams Expansion, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sun Streams 3", "city": "", "id": "1326", "external_id": "67285", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "430", "power_mw": "215", "customer": "", "owner": "Sun Streams PVS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Serrano", "city": "", "id": "1327", "external_id": "67503", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "426", "power_mw": "213", "customer": "", "owner": "Serrano Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "McFarland C", "city": "", "id": "1328", "external_id": "67498", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scatter Wash 1", "city": "", "id": "1329", "external_id": "67454", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "340", "power_mw": "170", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Harquahala 2", "city": "", "id": "1330", "external_id": "67474", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Copia Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scatter Wash 2", "city": "", "id": "1331", "external_id": "67455", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "170", "power_mw": "85", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pluto Energy Storage", "city": "", "id": "1332", "external_id": "67328", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Pluto Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yuma Solar + Storage", "city": "", "id": "1333", "external_id": "67321", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "134", "power_mw": "67", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Apache Solar 1", "city": "", "id": "1334", "external_id": "60964", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Electric Pwr Coop Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trestles Grid LLC", "city": "", "id": "1335", "external_id": "67229", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Trestles Grid LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pome BESS", "city": "", "id": "1336", "external_id": "67299", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "IOWN Renewable", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES ES Alamitos 2 LLC", "city": "", "id": "1337", "external_id": "67579", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "164", "power_mw": "82", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Azalea (CA)", "city": "", "id": "1338", "external_id": "66890", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Idemitsu Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bromley Battery Storage", "city": "", "id": "1339", "external_id": "67305", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Davis Battery Storage", "city": "", "id": "1340", "external_id": "67304", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Keenesburg Battery Storage", "city": "", "id": "1341", "external_id": "67306", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rattlesnake Ridge Battery Storage", "city": "", "id": "1342", "external_id": "67300", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "High Mesa CO", "city": "", "id": "1343", "external_id": "67323", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mamm Creek", "city": "", "id": "1344", "external_id": "67322", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kuna BESS", "city": "", "id": "1345", "external_id": "67549", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Kuna BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Happy Valley Battery Storage", "city": "", "id": "1346", "external_id": "67573", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "164", "power_mw": "82", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cavalry Solar Hybrid", "city": "", "id": "1347", "external_id": "67489", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "45", "customer": "", "owner": "Cavalry Energy Center LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carne Energy Storage, LLC", "city": "", "id": "1348", "external_id": "67230", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "260", "power_mw": "130", "customer": "", "owner": "Carne Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Quail Ranch Solar and BESS", "city": "", "id": "1349", "external_id": "67204", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Quail Ranch Solar and Battery Energy Storage System", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Milagro Solar I", "city": "", "id": "1350", "external_id": "67528", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Milagro Solar I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wildcat Solar Power Plant LLC", "city": "", "id": "1351", "external_id": "64849", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Solariant Capital, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Big Fork Solar", "city": "", "id": "1352", "external_id": "62184", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "148", "power_mw": "74", "customer": "", "owner": "Big Fork Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Colleton Solar", "city": "", "id": "1353", "external_id": "62188", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "148", "power_mw": "74", "customer": "", "owner": "Colleton Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Crossroads Solar", "city": "", "id": "1354", "external_id": "62190", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Crossroads Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Quest Solar", "city": "", "id": "1355", "external_id": "62299", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Quest Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Anemoi Energy Storage", "city": "", "id": "1356", "external_id": "67236", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Anemoi Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ebony Energy Storage", "city": "", "id": "1357", "external_id": "67237", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Ebony Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alina Energy LLC", "city": "", "id": "1358", "external_id": "67250", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Alina Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rock Rose Energy Storage LLC", "city": "", "id": "1359", "external_id": "67249", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Rock Rose Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bell Creek BESS LLC", "city": "", "id": "1360", "external_id": "67535", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Nexus Renewables U.S. Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackcat BESS", "city": "", "id": "1361", "external_id": "67558", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wetzel BESS", "city": "", "id": "1362", "external_id": "67555", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Serrano BESS", "city": "", "id": "1363", "external_id": "67556", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Willow Energy Storage", "city": "", "id": "1364", "external_id": "67598", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Desert Willow Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SGT Hoskins Solar Project Hybrid", "city": "", "id": "1365", "external_id": "67341", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "204", "power_mw": "102", "customer": "", "owner": "SGT Hoskins Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Jim Wells BESS", "city": "", "id": "1366", "external_id": "67553", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cairos Solar and Storage", "city": "", "id": "1367", "external_id": "67581", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "154", "power_mw": "77", "customer": "", "owner": "Samsung C&T Renewables, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ganado Solar", "city": "", "id": "1368", "external_id": "67284", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Enel Green Power NA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-03-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elm Flats Solar", "city": "", "id": "1369", "external_id": "67552", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Birch Creek Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cedar Hill ESS", "city": "", "id": "1370", "external_id": "67570", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Cedar Hill ESS Assets, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Green River Energy Center - Hybrid", "city": "", "id": "1371", "external_id": "67501", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Green River Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hornshadow Solar II, LLC", "city": "", "id": "1372", "external_id": "67511", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Hornshadow Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hornshadow Solar, LLC", "city": "", "id": "1373", "external_id": "67497", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Hornshadow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sendai", "city": "sendai", "id": "1374", "external_id": "", "state": "miyagi", "country": "japan", "capacity_mwh": "43", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Kenes", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "14", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.271948", "long": "140.833529", "coords_hint": "3", "use_case": "", "notes": "guessed the mw, assuming it is a 4h system", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1802738958679285856", "link2": "", "link3": "", "link4": ""}, {"name": "Rye Common Lane", "city": "", "id": "1375", "external_id": "7028", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pancross & Oaklands Solar Farm", "city": "", "id": "1376", "external_id": "7702", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Sirius Renewable Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carlisle Road - Battery Energy Storage System", "city": "", "id": "1377", "external_id": "9684", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chapel Lane - Battery Energy Storage System", "city": "", "id": "1378", "external_id": "9721", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hornsea Project Three - Battery Storage", "city": "", "id": "1379", "external_id": "9754", "state": "eastern", "country": "uk", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "Orsted Power (UK) Limited", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1800920444276543858", "link2": "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511", "link3": "", "link4": ""}, {"name": "Glenniston Farm, Auchtertool - Solar Farm", "city": "", "id": "1380", "external_id": "10434", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Locogen Consulting Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Culachy Wind Farm", "city": "", "id": "1381", "external_id": "10714", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Fred Olsen Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Printworks Road - Stalybridge Battery Storage", "city": "", "id": "1382", "external_id": "10808", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Watten Wind Farm", "city": "", "id": "1383", "external_id": "11480", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ben Aketil Wind Farm - Repowered & Extended", "city": "", "id": "1384", "external_id": "11876", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Falck Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "city": "", "id": "1385", "external_id": "11999", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Assured Asset Solar 2 Limited (Peridot Solar)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "city": "", "id": "1386", "external_id": "12024", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Resources Unlimited LLP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "city": "", "id": "1387", "external_id": "12026", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Loch Fergus Farm - Energy Storage System", "city": "", "id": "1388", "external_id": "12274", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Locogen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "city": "", "id": "1389", "external_id": "12350", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Relay Balbeggie Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Supernode Stage 1", "city": "brisbane", "id": "1390", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "520", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.318405", "long": "152.969631", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "link2": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link3": "https://x.com/FredericLambert/status/1811399467070894094", "link4": ""}, {"name": "Supernode Stage 2", "city": "brisbane", "id": "1391", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "1040", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.320103", "long": "152.970537", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link2": "https://x.com/FredericLambert/status/1811399467070894094", "link3": "", "link4": ""}, {"name": "Brendale BESS", "city": "brisbane", "id": "1392", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "410", "estimate_mwh": "", "power_mw": "205", "customer": "", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.329132", "long": "152.973193", "coords_hint": "1", "use_case": "", "notes": "got the location from the picture and in the energy storage article it says it is hosted on unitywater site", "project_website": "https://akayshaenergy.com/projects/brendale-bess", "link1": "https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/", "link2": "", "link3": "", "link4": ""}, {"name": "Ville-sur-Haine", "city": "", "id": "1393", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Eneco", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.47647", "long": "4.077998", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/", "link2": "", "link3": "", "link4": ""}, {"name": "Collie Battery Stage 2", "city": "", "id": "1394", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "1363", "estimate_mwh": "", "power_mw": "341", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31", "long": "116.29", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://colliebattery.com.au/2024/05/01/construction-stage2/", "link2": "", "link3": "", "link4": ""}, {"name": "Orana BESS", "city": "wellington", "id": "1395", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1660", "estimate_mwh": "", "power_mw": "415", "customer": "EnergyAustralia", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "650", "cost_currency": "AUD", "cost_incl_solar": "0", "lat": "-32.527608", "long": "148.958942", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1812687836887281794", "link2": "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million", "link3": "", "link4": ""}, {"name": "Limondale", "city": "balranald", "id": "1396", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "RWE", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.774873", "long": "143.526866", "coords_hint": "2", "use_case": "", "notes": "location from the balrnald supstation on google maps", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1795348622864945179", "link2": "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/", "link3": "", "link4": ""}] \ No newline at end of file +[{"name": "Kapolei Energy Storage", "city": "", "id": "1", "external_id": "66067", "state": "hawaii", "country": "usa", "capacity_mwh": "565", "estimate_mwh": "", "power_mw": "185", "customer": "Hawaiian Electric", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "158", "status": "operation", "date_first_heard": "", "start_construction": "2021-08-25", "start_operation": "2024-01-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.328169", "long": "-158.105085", "coords_hint": "1", "use_case": "island, black start", "notes": "", "project_website": "https://www.kapoleienergystorage.com/overview", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "link2": "https://twitter.com/Tesla_Megapack/status/1745499330612748482", "link3": "", "link4": ""}, {"name": "Victorian Big Battery", "city": "geelong", "id": "2", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "450", "estimate_mwh": "", "power_mw": "300", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "212", "status": "operation", "date_first_heard": "2020-11-01", "start_construction": "2021-01-01", "start_operation": "2021-12-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.037741", "long": "144.290949", "coords_hint": "1", "use_case": "", "notes": "incident: fire of 2 megapacks on 30.7.2021, burned for ca 3 days, the site was not live yet, it happened during a internal test ** 2021-09-03 moving project back to construction", "project_website": "https://victorianbigbattery.com.au/", "link1": "https://www.teslarati.com/telsa-megpack-victorian-big-battery-launched/", "link2": "https://techau.com.au/victorias-grid-just-got-greener-thanks-to-212-tesla-megapack-batteries-300mw-450mwh/", "link3": "https://www.bestmag.co.uk/indnews/tesla%E2%80%99s-lithium-ion-megapack-causes-three-day-fire-during-test-australian-300mw-ess", "link4": "https://www.energy-storage.news/victorian-big-battery-australias-biggest-battery-storage-system-at-450mwh-is-online/"}, {"name": "Saticoy", "city": "oxnard / los angeles", "id": "3", "external_id": "63891", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Arevon", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "142", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-06-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.25773", "long": "-119.158534", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "", "project_website": "", "link1": "https://electrek.co/2021/06/30/tesla-megapacks-power-on-battery-replacing-gas-peaker-plant-california/", "link2": "https://www.prnewswire.com/news-releases/arevon-powers-oxnard-forward-with-saticoy-battery-storage-project-301321788.html", "link3": "https://arevonenergy.com/location/saticoy/", "link4": ""}, {"name": "California Flats", "city": "monterey county", "id": "4", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "130", "customer": "Apple", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "85", "status": "operation", "date_first_heard": "2021-03-21", "start_construction": "", "start_operation": "2023-04-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.87009", "long": "-120.326403", "coords_hint": "1", "use_case": "130MW solar farm support", "notes": "used the release date of the youtube video as the operation start date", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-apple-solar-farm-california/", "link2": "https://www.apple.com/newsroom/2021/03/apple-powers-ahead-in-new-renewable-energy-solutions-with-over-110-suppliers/", "link3": "https://www.firstsolar.com/en/Resources/Projects/California-Flats", "link4": "https://www.youtube.com/watch?v=SA3SdlKBtyc"}, {"name": "Nofar Israel", "city": "", "id": "5", "external_id": "", "state": "", "country": "israel", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "Nofar Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.961747", "long": "34.835081", "coords_hint": "0", "use_case": "150mw solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tsla-receives-30-million-order-for-energy-storage-system-from-nofar-energy", "link2": "", "link3": "", "link4": ""}, {"name": "Gambit", "city": "angleton / houston", "id": "6", "external_id": "64528", "state": "texas", "country": "usa", "capacity_mwh": "175", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-08", "start_construction": "2021-03-08", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.168189", "long": "-95.445369", "coords_hint": "1", "use_case": "tesla as energy providor", "notes": "drone video only show ca 130 white boxes and each is 2 megapacks, there is a vistra battery close by that is even bigger", "project_website": "https://www.gambit-energystorage.com/", "link1": "https://www.teslarati.com/tesla-texas-big-battery-report/", "link2": "https://twitter.com/Tesla_Megapack/status/1770174273719513120", "link3": "https://www.youtube.com/watch?v=OottNRdebs8", "link4": "https://www.sec.gov/Archives/edgar/data/1318605/000156459021004599/tsla-ex211_15.htm"}, {"name": "Moss landing / Elkhorn", "city": "close to santa cruz", "id": "7", "external_id": "62564", "state": "california", "country": "usa", "capacity_mwh": "730", "estimate_mwh": "", "power_mw": "182", "customer": "PG&E", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "256", "status": "operation", "date_first_heard": "", "start_construction": "2020-07-01", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.807971", "long": "-121.781701", "coords_hint": "1", "use_case": "", "notes": "in 2020, 64mwh were added", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-battery-moss-landing-completion-video/", "link2": "https://en.wikipedia.org/wiki/Tesla_Megapack", "link3": "", "link4": ""}, {"name": "Hornsdale Power Reserve", "city": "hornsdale", "id": "8", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "194", "estimate_mwh": "", "power_mw": "150", "customer": "Neoen Australia", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-10", "start_construction": "2017-08-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.085797", "long": "138.518339", "coords_hint": "1", "use_case": "316MW wind farm support", "notes": "42 power packs", "project_website": "https://hornsdalepowerreserve.com.au/", "link1": "https://en.wikipedia.org/wiki/Hornsdale_Power_Reserve", "link2": "", "link3": "", "link4": ""}, {"name": "Osaka Trains", "city": "Osaka", "id": "9", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "42", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.701231", "long": "135.494584", "coords_hint": "0", "use_case": "train station backup", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/telsa-powerpack-osaka-japan/", "link2": "", "link3": "", "link4": ""}, {"name": "Hokkaido", "city": "", "id": "10", "external_id": "", "state": "", "country": "japan", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.325369", "long": "142.589328", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.bloomberg.com/news/articles/2021-08-19/tesla-plotting-battery-storage-entry-into-japan-s-power-market", "link2": "", "link3": "", "link4": ""}, {"name": "Vallecito Energy Storage Resilience (VESR)", "city": "carpinteria / santa barbara county", "id": "11", "external_id": "62801", "state": "california", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Clean Coalition", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "2020-11-05", "start_operation": "2021-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.408083", "long": "-119.512937", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-begins-installation-of-15-megapacks-at-carpinteria-santa-barbara-county", "link2": "https://clean-coalition.org/news/vallecito-energy-storage-resilience-vesr-project-online-december/", "link3": "", "link4": ""}, {"name": "Wallgrove Grid Battery", "city": "Wallgrove / Sydney", "id": "12", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "75", "estimate_mwh": "", "power_mw": "50", "customer": "TransGrid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-27", "start_construction": "2021-02-01", "start_operation": "2021-12-01", "start_estimated": "", "cost_million": "65", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-33.817659", "long": "150.828087", "coords_hint": "1", "use_case": "FCAS, synthetic inertia", "notes": "", "project_website": "https://www.transgrid.com.au/wallgrovebattery", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-and-transgrid-will-build-tesla-megapack-battery-in-western-sydney-australia", "link2": "https://arena.gov.au/projects/transgrid-wallgrove-battery/", "link3": "", "link4": ""}, {"name": "EReserve 1-9 (9 different locations)", "city": "", "id": "13", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "315", "estimate_mwh": "", "power_mw": "180", "customer": "WCSB Power", "owner": "Enfinite", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-17", "start_construction": "", "start_operation": "2024-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "55.740245", "long": "-118.700003", "coords_hint": "1", "use_case": "", "notes": "eReserve is at 9 different locations in alberta canada, but just using the location of e reserve 1 here ** the mwh number is from the twitter post", "project_website": "https://ereserve-project.com/", "link1": "http://td.mediaroom.com/2020-10-14-TD-Greystone-Infrastructure-Fund-Invested-in-Canadas-Largest-Battery-Energy-Storage-System", "link2": "https://www.teslarati.com/tesla-canada-biggest-battery-energy-storage-system/", "link3": "https://x.com/Tesla_Megapack/status/1781467958218469840", "link4": "https://www.energy-storage.news/enfinite-energises-60mw-of-bess-in-alberta-canada-completing-nine-project-portfolio/"}, {"name": "WindCharger", "city": "", "id": "16", "external_id": "", "state": "alberta", "country": "canada", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "10", "customer": "TransAlta", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "9", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "49.582737", "long": "-113.794235", "coords_hint": "1", "use_case": "wind farm support", "notes": "", "project_website": "", "link1": "https://www.transaltarenewables.com/2020/10/15/transalta-renewables-announces-commercial-operation-of-windcharger-albertas-first-utility-scale-battery-storage-project/", "link2": "https://www.teslarati.com/tesla-megapack-alberta-windcharger-complete/", "link3": "https://transalta.com/wp-content/uploads/2020/04/WindCharger_Construction_Start_Newsletter_2020.pdf", "link4": ""}, {"name": "Holes Bay", "city": "Poole", "id": "17", "external_id": "", "state": "dorset", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "7.5", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures BV ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-09-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-autobidder-uk-energy-grid-debut/", "link2": "https://www.bloomberg.com/news/articles/2020-09-18/six-giant-tesla-batteries-used-to-keep-lights-on-in-britain", "link3": "https://www.harmonyenergy.co.uk/general/video-holes-bay-battery-energy-storage-plant/", "link4": "https://frv.com/en/projects/holes-bay/"}, {"name": "switch datacenter", "city": "", "id": "18", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "", "customer": "switch", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.058908", "long": "-115.21174", "coords_hint": "0", "use_case": "datacenter", "notes": "", "project_website": "", "link1": "https://electrek.co/2020/07/24/tesla-megapack-project-switch-datacenter/", "link2": "", "link3": "", "link4": ""}, {"name": "Kauai Island", "city": "Kauai", "id": "19", "external_id": "", "state": "hawaii", "country": "usa", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "", "customer": "KIUC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-03-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "21.998353", "long": "-159.378905", "coords_hint": "1", "use_case": "island, 13mw solar farm support", "notes": "20 year contract to buy energy", "project_website": "", "link1": "https://www.theverge.com/2017/3/8/14854858/tesla-solar-hawaii-kauai-kiuc-powerpack-battery-generator", "link2": "https://www.youtube.com/watch?v=X45Iv6b5Zs4&t=78s", "link3": "https://en.wikipedia.org/wiki/Kauai", "link4": ""}, {"name": "Mira Loma Substation", "city": "Ontario", "id": "20", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "SCE Southern California Edison", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-06-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.00548", "long": "-117.566749", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.theverge.com/2017/2/6/14523196/tesla-battery-powerpack-los-angeles-electricity", "link2": "", "link3": "", "link4": ""}, {"name": "ngen slovenia 2", "city": "Kidrievo", "id": "21", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "15", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "12", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.391223", "long": "15.78985", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.teslarati.com/tesla-megapack-installation-ngen-slovenia/", "link2": "", "link3": "", "link4": ""}, {"name": "ngen slovenia 1", "city": "Jesenice", "id": "22", "external_id": "", "state": "", "country": "slovenia", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "12", "customer": "ngen", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-10-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.418237", "long": "14.10062", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.youtube.com/watch?v=v9j-2lsMcJ0", "link2": "", "link3": "", "link4": ""}, {"name": "Alaska Soldotna", "city": "Soldotna Power Plant", "id": "23", "external_id": "57206", "state": "alaska", "country": "usa", "capacity_mwh": "93", "estimate_mwh": "", "power_mw": "46", "customer": "Homer Electric Association", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "37", "status": "operation", "date_first_heard": "2019-12-03", "start_construction": "", "start_operation": "2021-07-23", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "60.500441", "long": "-150.996312", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.homerelectric.com/2019/12/battery-energy-storage-system-bess-coming-to-hea/", "link2": "https://www.homerelectric.com/2021/07/battery-energy-storage-system-has-arrived/", "link3": "", "link4": ""}, {"name": "Colorado ", "city": "Weld County", "id": "24", "external_id": "", "state": "colorado", "country": "usa", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "4", "customer": "United Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-10-14", "start_construction": "", "start_operation": "2019-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.577109", "long": "-104.40854", "coords_hint": "0", "use_case": "", "notes": "could not find exact location though it is operational", "project_website": "", "link1": "https://www.youtube.com/watch?v=dyAhUREGDzA", "link2": "https://electrek.co/2018/10/14/tesla-powerpack-project-save-colorado-ratepayers/", "link3": "", "link4": ""}, {"name": "Nantucket", "city": "Nantucket island", "id": "25", "external_id": "", "state": "massachusetts", "country": "usa", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "6", "customer": "National Grid", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "2019-19-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.258489", "long": "-70.051666", "coords_hint": "1", "use_case": "island", "notes": "", "project_website": "", "link1": "https://electrek.co/2017/11/08/tesla-powerpack-island-of-nantucket/", "link2": "https://electrek.co/2019/10/09/tesla-big-powerpack-nantucket/", "link3": "", "link4": ""}, {"name": "Guildford electric buses", "city": "guildford", "id": "26", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "", "customer": "Zenobe Energy ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.205099", "long": "-0.581772", "coords_hint": "1", "use_case": "bus depot", "notes": "it is a stagecoach bus depot", "project_website": "", "link1": "https://electrek.co/2019/06/26/tesla-powerpacks-charge-electric-buses/", "link2": "https://www.teslarati.com/tesla-powerpacks-clean-up-britain-public-transportation/", "link3": "", "link4": ""}, {"name": "Gannawarra Solar Farm", "city": "", "id": "27", "external_id": "", "state": "victora", "country": "australia", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "25", "customer": "Edify Energy / Wirsol", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-35.734258", "long": "143.780015", "coords_hint": "1", "use_case": "60MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/11/16/tesla-powerpack-project-australia-megapack/", "link2": "", "link3": "", "link4": ""}, {"name": "Lake Bonney Wind Farm", "city": "", "id": "28", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "25", "customer": "Infigen Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-08-15", "start_construction": "", "start_operation": "2020-01-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-37.738826", "long": "140.38693", "coords_hint": "1", "use_case": "278MW wind farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/08/15/tesla-powerpack-win-contract-battery-system/", "link2": "https://www.pv-magazine.com/2020/01/22/lake-bonney-big-battery-ready-to-supply-teslas-australian-ev-charger-network/", "link3": "", "link4": ""}, {"name": "Ta'u island", "city": "Ta'u island", "id": "29", "external_id": "", "state": "american samoa", "country": "usa", "capacity_mwh": "6", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-11-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-14.219534", "long": "-169.494626", "coords_hint": "1", "use_case": "island, 1.4MW solar farm support", "notes": "", "project_website": "", "link1": "https://electrek.co/2016/11/22/tesla-island-microgrid-battery-solar/", "link2": "", "link3": "", "link4": ""}, {"name": "Samoa", "city": "", "id": "30", "external_id": "", "state": "", "country": "samoa", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-13.885669", "long": "-171.884245", "coords_hint": "1", "use_case": "island", "notes": "2 locations at power station and airport", "project_website": "", "link1": "https://electrek.co/2018/07/25/tesla-microgrid-powerpack-projects-samoa-fossil-fuel-free/", "link2": "", "link3": "", "link4": ""}, {"name": "Pinal Central Solar Energy Center", "city": "", "id": "31", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "10", "customer": "Salt River Project", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-29", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.868983", "long": "-111.557171", "coords_hint": "1", "use_case": "20MW solar farm support", "notes": "Added 40 mwh as the youtube video said it can power with 10MW for 4 hours", "project_website": "", "link1": "https://electrek.co/2018/05/29/tesla-powerpacks-without-logo-new-solar-project-arizona/", "link2": "https://www.youtube.com/watch?v=e9RuVL3t4jQ", "link3": "", "link4": ""}, {"name": "Terhills", "city": "Terhills", "id": "32", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "29", "estimate_mwh": "", "power_mw": "18", "customer": "Restore", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "272", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-05-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.006595", "long": "5.711134", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://electrek.co/2018/05/14/tesla-powerpack-project-grid-balancing-europe/", "link2": "", "link3": "", "link4": ""}, {"name": "Ozop New York", "city": "new york city / brooklyn", "id": "33", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "2", "customer": "Ozop Energy Systems", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.645624", "long": "-73.940749", "coords_hint": "0", "use_case": "peak shaving", "notes": "together with stem athena software", "project_website": "", "link1": "https://www.globenewswire.com/news-release/2021/08/25/2286612/0/en/Ozop-Energy-Solutions-Inc-to-Utilize-Tesla-MEGAPACK-in-Battery-Storage-System-Design-Updated.html", "link2": "https://www.globenewswire.com/news-release/2021/08/18/2282824/0/en/Ozop-Energy-Solutions-OZSC-Announces-Stem-Smart-Energy-Storage-2MW-4MWh-Project-in-New-York-City.html", "link3": "", "link4": ""}, {"name": "Goleta Energy Storage Project", "city": "Goleta", "id": "34", "external_id": "66394", "state": "california", "country": "usa", "capacity_mwh": "160", "estimate_mwh": "", "power_mw": "60", "customer": "Goleta Energy Storage, LLC", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "62", "status": "operation", "date_first_heard": "2019-11-13", "start_construction": "", "start_operation": "2023-12-05", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.43274", "long": "-119.869283", "coords_hint": "1", "use_case": "peaker plant replacement", "notes": "the planning document on the website has a lot of detail", "project_website": "https://www.cityofgoleta.org/city-hall/planning-and-environmental-review/ceqa-review/cortona-battery-storage-project", "link1": "https://www.cityofgoleta.org/Home/Components/News/News/14634/3875?npage=2", "link2": "", "link3": "", "link4": ""}, {"name": "Contego", "city": "Hurstpierpoint", "id": "35", "external_id": "", "state": "west sussex", "country": "uk", "capacity_mwh": "68", "estimate_mwh": "", "power_mw": "34", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures ", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "28", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-07", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.955104", "long": "-0.163008", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.harmonyenergy.co.uk/projects/", "link1": "https://www.teslarati.com/tesla-batteries-uk-largest-energy-storage/", "link2": "https://www.youtube.com/watch?v=zh6PFeObrHs", "link3": "", "link4": ""}, {"name": "Trents Energy Storage", "city": "St. Lucy", "id": "36", "external_id": "", "state": "", "country": "barbados", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "5", "customer": "Barbados Light & Power", "owner": "", "developer": "", "manufacturer": "tesla", "type": "powerpack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "13.293125", "long": "-59.627449", "coords_hint": "1", "use_case": "island, solar farm support", "notes": "", "project_website": "", "link1": "https://www.blpc.com.bb/images/watts_new_print/LEX_BLPC_Newsletter_2020_Vol19_SEP3.pdf?type=file", "link2": "https://www.solarbarbados.com/2019/05/09/first-utility-scale-solar-farm-10mw-in-barbados/", "link3": "", "link4": ""}, {"name": "Moss Landing", "city": "Moss Landing", "id": "37", "external_id": "260", "state": "california", "country": "usa", "capacity_mwh": "1600", "estimate_mwh": "", "power_mw": "400", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "LG", "type": "", "cells": "LG", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-02-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.806072", "long": "-121.782258", "coords_hint": "1", "use_case": "", "notes": "TR1200 rack design with JH4 cell, 4500+ racks, two stages here ** incident: septemter 2021 the first phase 1200 MWh was shut down after an overheating triggered the sprinkler system. ", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://www.energy-storage.news/manufacturer-reveals-involvement-in-worlds-biggest-battery-energy-storage-system-so-far/", "link2": "https://insideevs.com/news/489894/vistra-moss-landing-energy-storage-world-largest/", "link3": "https://reneweconomy.com.au/worlds-biggest-battery-sidelined-after-overheating-incident-in-california/", "link4": ""}, {"name": "Docordova", "city": "Hood County", "id": "38", "external_id": "8063", "state": "texas", "country": "usa", "capacity_mwh": "260", "estimate_mwh": "", "power_mw": "260", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.430077", "long": "-97.695028", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://urjadaily.com/vistra-brings-worlds-largest-utility-scale-battery-energy-storage-system-online/", "link2": "", "link3": "", "link4": ""}, {"name": "Oakland", "city": "Oakland", "id": "39", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "36", "estimate_mwh": "", "power_mw": "145", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-09", "start_construction": "", "start_operation": "", "start_estimated": "2022", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.79422", "long": "-122.20837", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton 2", "city": "Upton County", "id": "40", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "42", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.255119", "long": "-102.246596", "coords_hint": "0", "use_case": "180MW solar farm support", "notes": "", "project_website": "https://www.vistracorp.com/vistra-zero/", "link1": "https://www.energy-storage.news/us-utility-vistra-plans-texas-solar-storage-facilities-alongside-6-8gw-of-coal-retirement-by-2027/", "link2": "https://www.luminant.com/upton-2-solar-power-plant-energy-storage-facility/", "link3": "", "link4": ""}, {"name": "Morro Bay", "city": "Morro Bay", "id": "41", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "2400", "estimate_mwh": "", "power_mw": "600", "customer": "Vistra Corp", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.374224", "long": "-120.858684", "coords_hint": "1", "use_case": "", "notes": "revitalise existing gas power plant site, start construction in 2022 should take 36-48 month to complete", "project_website": "", "link1": "https://www.energy-storage.news/vistra-proposes-california-battery-project-twice-the-size-of-worlds-largest-facility-to-date/", "link2": "http://www.morrobayca.gov/documentcenter/view/15093", "link3": "", "link4": ""}, {"name": "Big Star", "city": "Bastrop County", "id": "42", "external_id": "64202", "state": "texas", "country": "usa", "capacity_mwh": "120", "estimate_mwh": "", "power_mw": "80", "customer": "RWE Renewables", "owner": "", "developer": "", "manufacturer": "LG", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "29.913908", "long": "-97.289792", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/rwe-signs-up-corporate-offtaker-for-big-star-texas-solar-plus-storage-project/", "link2": "https://www.rwe.com/en/press/rwe-renewables/2021-08-25-rwe-teams-up-with-constellation-to-supply-major-us-commercial-customers-with-solar-energy-from-big-star-facility", "link3": "", "link4": ""}, {"name": "Hickory Park", "city": "Mitchell County", "id": "43", "external_id": "63522", "state": "georgia", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "40", "customer": "RWE Renewables", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "GridSolv Quantum", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-11-17", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.31621", "long": "-84.124752", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "2021: 30 year PPA with Georgia Power", "project_website": "", "link1": "https://www.energy-storage.news/lg-energy-solution-supplying-800mwh-battery-storage-for-rwes-us-solar-plus-storage-projects/", "link2": "https://www.rwe.com/en/press/rwe-renewables/2020-11-17-rwes-hickory-park-solar-project-with-co-located-storage-facility-under-construction", "link3": "", "link4": ""}, {"name": "Hubei Flow Battery", "city": "Xiangyang", "id": "44", "external_id": "", "state": "hubei", "country": "china", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "100", "customer": "Hubei Pingfan Ruifeng New Energy Technology", "owner": "", "developer": "", "manufacturer": "VRB Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-05-21", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.075783", "long": "112.145275", "coords_hint": "0", "use_case": "500MW rooftop solar support", "notes": "Vanadium flow battery, built in phases", "project_website": "", "link1": "https://www.energy-storage.news/vrb-energy-breaks-ground-on-100mw-500mwh-flow-battery-and-gigafactory-in-china/", "link2": "https://vrbenergy.com/vrb-energy-announces-agreement-for-chinas-largest-solar-battery-a-100mw-solar-storage-project-in-hubei-province/", "link3": "", "link4": ""}, {"name": "Riverina 1 + 2 / Darlington Point Energy Storage", "city": "Darlington Point", "id": "45", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "Edify Energy / Shell", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-05-25", "start_construction": "", "start_operation": "2023-10-09", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.646927", "long": "146.03516", "coords_hint": "1", "use_case": "333MW solar farm support", "notes": "it says on the project website that the 3 projects are colocated, so combined them here into just one entry", "project_website": "https://edifyenergy.com/project/riverina-darlington-point/", "link1": "https://www.pv-magazine-australia.com/2023/10/09/edify-claims-new-era-in-energy-transition-as-nsws-largest-battery-system-goes-live/", "link2": "https://www.power-technology.com/news/edify-shell-riverina-energy-storage/", "link3": "https://www.energy-storage.news/tesla-megapacks-picked-for-edifys-300mwh-australia-battery-portfolio/", "link4": "https://pp.planningportal.nsw.gov.au/major-projects/projects/darlington-point-solar-farm"}, {"name": "Alamitos", "city": "Long Beach / Los Angeles", "id": "46", "external_id": "61204", "state": "california", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "Southern California Edison (SCE)", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Advancion 5", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-06-01", "start_operation": "2021-01-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.770365", "long": "-118.101597", "coords_hint": "1", "use_case": "gas peaker plant replacement, 20 year ppa", "notes": "", "project_website": "", "link1": "https://blog.fluenceenergy.com/aes-fluence-commission-alamitos-energy-storage-facility-long-beach-california", "link2": "https://blog.fluenceenergy.com/fluence-aes-alamitos-battery-energy-storage-system-made-history", "link3": "https://www.energy-storage.news/battery-storage-as-peaking-capacity-how-alamitos-changed-the-game-for-california/", "link4": ""}, {"name": "Diablo", "city": "Pittsburg", "id": "47", "external_id": "62175", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "LS Power / PG & E", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-30", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.015262", "long": "-121.846146", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/direct-energy-business-to-use-some-of-worlds-biggest-battery-projects-to-serve-california-customers/", "link2": "https://www.lspower.com/project-map/", "link3": "https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21131879/pge-poised-to-expand-battery-energy-storage-capacity-by-more-than-420-mw", "link4": ""}, {"name": "Gateway ", "city": "East Otey Mesa / San Diego", "id": "48", "external_id": "63834", "state": "california", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "LG", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-09-01", "start_operation": "2020-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.570558", "long": "-116.910955", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://vimeo.com/429223580", "link3": "https://en.wikipedia.org/wiki/Gateway_Energy_Storage", "link4": ""}, {"name": "Vista", "city": "Vista", "id": "49", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "40", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.20395", "long": "-117.253731", "coords_hint": "0", "use_case": "", "notes": "no source about the capacity", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://www.mapsearch.com/power-plant/vista-energy-storage-system/", "link3": "", "link4": ""}, {"name": "LeConte", "city": "Calexico / Imperial County", "id": "50", "external_id": "64701", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "125", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.67641", "long": "-115.670255", "coords_hint": "1", "use_case": "", "notes": "planning doc is available", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "https://ceqanet.opr.ca.gov/2010111056/7", "link3": "", "link4": ""}, {"name": "Ravenswood", "city": "Long Island City / Queens", "id": "51", "external_id": "2500", "state": "new york", "country": "usa", "capacity_mwh": "2528", "estimate_mwh": "", "power_mw": "316", "customer": "LS Power", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-02-01", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.761642", "long": "-73.944275", "coords_hint": "1", "use_case": "", "notes": "planning doc is available ** 2021-02-03: project could be delayed until 2024 ", "project_website": "", "link1": "https://www.lspower.com/project-map/", "link2": "http://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B4A8305F4-BECF-46EE-B493-A088AA7AA8F6%7D&usg=AOvVaw2Yrkm30CAqrxvAShHegBAw", "link3": "https://www.spglobal.com/marketintelligence/en/news-insights/latest-news-headlines/lacking-contract-ls-power-delays-major-battery-storage-station-in-ny-62467197", "link4": ""}, {"name": "Korea Zinc", "city": "ulsan", "id": "52", "external_id": "", "state": "", "country": "south korea", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "32", "customer": "Korea Zinc", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-07-27", "start_construction": "", "start_operation": "2018-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.430406", "long": "129.340086", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://pulsenews.co.kr/view.php?year=2017&no=505105", "link2": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "link3": "https://www.koreazinc.co.kr/english/company/page/headOffice.aspx", "link4": ""}, {"name": "Seosan", "city": "seosan", "id": "53", "external_id": "", "state": "", "country": "south korea", "capacity_mwh": "140", "estimate_mwh": "", "power_mw": "52", "customer": "", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.636988", "long": "126.363673", "coords_hint": "1", "use_case": "65MW solar farm support", "notes": "", "project_website": "", "link1": "https://en.wikipedia.org/wiki/Battery_storage_power_station", "link2": "", "link3": "", "link4": ""}, {"name": "Solaseado", "city": "Haenam County", "id": "54", "external_id": "", "state": "jeolla", "country": "south korea", "capacity_mwh": "305", "estimate_mwh": "", "power_mw": "72", "customer": "Kospo", "owner": "", "developer": "", "manufacturer": "hyundai ", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-04-10", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.709899", "long": "126.41275", "coords_hint": "1", "use_case": "98MW solar farm support", "notes": "not sure whether Solaseado or Solasido is correct spelling", "project_website": "", "link1": "https://krenewables.com/solar/kospo-ignites-koreas-biggest-pv-farm/", "link2": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-hei-78", "link3": "", "link4": ""}, {"name": "Minety", "city": "Minety", "id": "55", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "133", "estimate_mwh": "", "power_mw": "100", "customer": "Penso Power / China Huaneng Group / CNIC", "owner": "", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "LFP CATL, NMC Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-12-01", "start_operation": "2020-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.605997", "long": "-2.003146", "coords_hint": "1", "use_case": "", "notes": "PPA from shell, when second stage is complete it will be 150MW/266MWh", "project_website": "https://www.pensopower.com/", "link1": "https://en.wikipedia.org/wiki/Battery_storage_power_station#cite_note-nsenergy-minety-55", "link2": "https://www.energy-storage.news/what-we-know-about-europes-largest-grid-connected-battery-project-so-far/", "link3": "https://eclipsepower.co.uk/project/minety-battery-storage/", "link4": ""}, {"name": "Yorkshire", "city": "yorkshire", "id": "56", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "27", "customer": "", "owner": "", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.949604", "long": "-1.190935", "coords_hint": "0", "use_case": "34MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/industry-updates/yorkshire-uk-europes-largest-unsubsidized-solar-plus-storage-project/", "link2": "", "link3": "", "link4": ""}, {"name": "Gateway Energy Project", "city": "London Gateway port/ essex", "id": "57", "external_id": "10309", "state": "", "country": "uk", "capacity_mwh": "900", "estimate_mwh": "", "power_mw": "320", "customer": "Intergen", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Gridstack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.512649", "long": "0.493992", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.intergen.com/our-technologies/development-projects/gateway-energy-centre/", "link1": "https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec", "link2": "", "link3": "", "link4": ""}, {"name": "Spalding", "city": "spalding", "id": "58", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "170", "customer": "Intergen", "owner": "", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.805112", "long": "-0.133741", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.intergen.com/our-technologies/development-projects/spalding-energy-park/", "link1": "https://www.solarpowerportal.co.uk/news/intergen_unveil_uks_largest_battery_storage_project_with_320mw_essex_projec", "link2": "", "link3": "", "link4": ""}, {"name": "Antofagasta", "city": "Atacama Desert", "id": "59", "external_id": "", "state": "", "country": "chile", "capacity_mwh": "560", "estimate_mwh": "", "power_mw": "112", "customer": "AES Gener", "owner": "", "developer": "", "manufacturer": "fluence", "type": "Sunstack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-19", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-24.014801", "long": "-68.58494", "coords_hint": "0", "use_case": "253MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/aes-begins-work-on-560mwh-largest-battery-system-in-latin-america-for-solar-and-wind-in-chile/", "link2": "https://www.renpp.eu/en/solar-project/andes-solar-park-1018", "link3": "", "link4": ""}, {"name": "Desert Quartize", "city": "Riverside County", "id": "60", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "", "customer": "EDF / Clean Power Alliance", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-15", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.586379", "long": "-114.785106", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "", "link1": "https://eplanning.blm.gov/eplanning-ui/project/68211/570", "link2": "https://www.blm.gov/press-release/blm-approves-desert-quartzite-solar-project-riverside-county", "link3": "https://www.energy-storage.news/california-community-group-signs-ppa-for-edfs-300mw-desert-quartzite-solar-plus-storage-project/", "link4": ""}, {"name": "Rexford Solar Farm", "city": "Tulare County", "id": "61", "external_id": "64633", "state": "california", "country": "usa", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "180", "customer": "8minute / Clean Power Alliance", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-11", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.853593", "long": "-119.051695", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "already a large solar farm visible on google maps, but the planning doc shows it will be on new locations between existing solar farm", "project_website": "https://www.8minute.com/energy-storage/", "link1": "https://www.energy-storage.news/california-community-energy-group-signs-ppa-for-400mw-540mwh-solar-plus-storage-plant/", "link2": "https://tularecounty.ca.gov/rma/index.cfm/planning-building/environmental-planning/environmental-impact-reports/rexford-solar-project-psp-19-073/", "link3": "", "link4": ""}, {"name": "Eland Solar", "city": "Kern County", "id": "62", "external_id": "61168", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "8minute / Capital Dynamics / LADWP", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-22", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.198008", "long": "-117.991201", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "location from planning doc ** partially online in 2022, fully in 2023", "project_website": "", "link1": "https://www.8minute.com/2020/01/capital-dynamics-and-8minute-solar-energy-partner-on-breakthrough-400mwac-eland-solar-storage-center/", "link2": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link3": "", "link4": ""}, {"name": "Sonoran Energy Center", "city": "Buckeye", "id": "63", "external_id": "66627", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "260", "customer": "Salt River Project", "owner": "NextEra Energy Resources", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.23927", "long": "-112.570054", "coords_hint": "2", "use_case": "solar", "notes": "", "project_website": "https://www.nexteraenergyresources.com/sonoran-solar/project-overview.html", "link1": "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "link2": "https://pv-magazine-usa.com/2021/08/11/nextera-will-build-a-solar-storage-project-with-salt-river-project-as-offtaker/", "link3": "", "link4": ""}, {"name": "Blythe II Storage Project", "city": "Riverside County", "id": "64", "external_id": "60092", "state": "california", "country": "usa", "capacity_mwh": "460", "estimate_mwh": "", "power_mw": "115", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Samsung", "type": "", "cells": "Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2013-04-22", "start_construction": "", "start_operation": "2021-02-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.676313", "long": "-114.75575", "coords_hint": "1", "use_case": "solar", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "https://ieefa.org/nextera-brings-first-section-of-massive-california-battery-storage-complex-online/", "link3": "", "link4": ""}, {"name": "Blythe III Storage Project", "city": "Riverside County", "id": "65", "external_id": "60094", "state": "california", "country": "usa", "capacity_mwh": "460", "estimate_mwh": "", "power_mw": "115", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Samsung", "type": "", "cells": "Samsung", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-02-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.673021", "long": "-114.754474", "coords_hint": "1", "use_case": "solar", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex, TODO: source that samsung supplies batteries", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "", "link3": "", "link4": ""}, {"name": "McCoy Storage Project", "city": "Riverside County", "id": "66", "external_id": "58462", "state": "california", "country": "usa", "capacity_mwh": "920", "estimate_mwh": "", "power_mw": "230", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.664118", "long": "-114.749852", "coords_hint": "1", "use_case": "250MW solar farm support", "notes": "part of 523 MW / 2092 MWh of storage at Blythe-McCoy Solar & Storage Complex", "project_website": "", "link1": "https://pv-magazine-usa.com/2020/05/02/southern-california-edison-wants-huge-770-mw-battery-storage-procurement-online-fast/", "link2": "", "link3": "", "link4": ""}, {"name": "Storey Energy Center", "city": "Coolidge", "id": "67", "external_id": "65956", "state": "arizona", "country": "usa", "capacity_mwh": "264", "estimate_mwh": "", "power_mw": "88", "customer": "Salt River Project", "owner": "NextEra Energy Resources", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.8882", "long": "-111.4978", "coords_hint": "1", "use_case": "88 MW solar farm support", "notes": "", "project_website": "https://www.nexteraenergyresources.com/storey-solar.html", "link1": "https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/Storey%20Solar%20Open%20House%20Slides_final%20for%20NEER%20website.pdf", "link2": "https://pv-magazine-usa.com/2019/11/15/srp-joins-the-big-boys-of-battery-storage/", "link3": "", "link4": ""}, {"name": "Edwards Sanborn Solar Storage", "city": "Kern County", "id": "68", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "2445", "estimate_mwh": "", "power_mw": "346", "customer": "Terra-Gen", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "LG & Samsung", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-12-10", "start_construction": "2021-02-01", "start_operation": "", "start_estimated": "2022Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.911468", "long": "-117.889716", "coords_hint": "0", "use_case": "1118 MW solar farm support", "notes": "735 MWh in Q3 '21, 1501 MWh by Q2 2022.", "project_website": "", "link1": "https://renewablesnow.com/news/terra-gen-secures-usd-800m-for-massive-solar-storage-project-in-california-749635/", "link2": "https://pv-magazine-usa.com/2021/08/02/terra-gen-secures-800-million-in-financing-for-solar-storage-project-in-california/", "link3": "https://pv-magazine-usa.com/2020/12/11/morning-brief-big-home-batteries-from-lg-energy-terra-gen-and-mortenson-start-on-worlds-largest-standalone-solar-and-storage-project/", "link4": ""}, {"name": "Tranquility Storage Retrofit", "city": "Cantua Creek", "id": "69", "external_id": "59939", "state": "california", "country": "usa", "capacity_mwh": "288", "estimate_mwh": "", "power_mw": "72", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Powin", "type": "", "cells": "Mitsubishi", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-05-01", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.591626", "long": "-120.404965", "coords_hint": "1", "use_case": "200 MW solar farm support", "notes": "LFP batteries", "project_website": "", "link1": "https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "link2": "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref", "link3": "", "link4": ""}, {"name": "Garland Storage Retrofit", "city": "Kern County", "id": "70", "external_id": "60233", "state": "california", "country": "usa", "capacity_mwh": "352", "estimate_mwh": "", "power_mw": "88", "customer": "Southern California Edison", "owner": "", "developer": "", "manufacturer": "Powin", "type": "", "cells": "Mitsubishi", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-05-01", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.829699", "long": "-118.510184", "coords_hint": "1", "use_case": "200 MW solar farm support", "notes": "LFP batteries", "project_website": "https://www.southernpowercompany.com/content/dam/southernpower/pdfs/fact-sheets/Garland_Energy_Storage_factsheet.pdf", "link1": "https://www.prnewswire.com/news-releases/southern-power-to-add-battery-energy-storage-resources-to-two-california-solar-projects-301222296.html", "link2": "https://www.renewableenergyworld.com/storage/mitsubishi-powin-to-provide-battery-storage-retrofits-to-california-solar-projects/#gref", "link3": "", "link4": ""}, {"name": "Manatee", "city": "Parrish / Manatee County", "id": "71", "external_id": "60014", "state": "florida", "country": "usa", "capacity_mwh": "900", "estimate_mwh": "", "power_mw": "409", "customer": "Florida Power and Light (FPL)", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-03-01", "start_construction": "2021-02-02", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "27.598383", "long": "-82.349213", "coords_hint": "1", "use_case": "solar farm support", "notes": "Already 75% complete in August 2021, 132 shipping containers", "project_website": "", "link1": "https://www.world-energy.org/article/19846.html", "link2": "https://www.youtube.com/watch?v=ZYbvXAS9buQ", "link3": "https://www.energy-storage.news/work-begins-on-409mw-900mwh-florida-battery-project-to-ease-natural-gas-plants-into-retirement/", "link4": ""}, {"name": "Crimson", "city": "Riverside County", "id": "72", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "1400", "estimate_mwh": "", "power_mw": "350", "customer": "Recurrent Energy / Axium Infrastructure", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.705099", "long": "-115.804279", "coords_hint": "0", "use_case": "", "notes": "construction is expected to start in q3 2021, location is 35miles northwest of substation near blythe / colorado river substation", "project_website": "https://recurrentenergy.com/project-portfolio/#", "link1": "https://www.energy-storage.news/canadian-solar-sells-majority-stake-in-1-4gwh-california-battery-energy-storage-project/", "link2": "https://www.energy-storage.news/us-doi-gives-green-light-to-350mw-1400mwh-energy-storage-project-in-california/", "link3": "", "link4": ""}, {"name": "Slate", "city": "Kings County", "id": "73", "external_id": "", "state": "california", "country": "usa", "capacity_mwh": "561", "estimate_mwh": "", "power_mw": "140", "customer": "Recurrent Energy / Goldman Sachs Renewables Power (GSRP)", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.227583", "long": "-119.877056", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/slate/", "link1": "https://www.energy-storage.news/progress-report-some-more-of-us-biggest-battery-projects-taking-shape/", "link2": "https://ceqanet.opr.ca.gov/2019069068/2", "link3": "", "link4": ""}, {"name": "Mustang", "city": "Kings County", "id": "74", "external_id": "59150", "state": "california", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "75", "customer": "Recurrent Energy / Goldman Sachs Renewables Power (GSRP)", "owner": "", "developer": "", "manufacturer": "byd", "type": "", "cells": "LFP", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.245785", "long": "-119.904115", "coords_hint": "0", "use_case": "100MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/mustang-solar-storage/", "link1": "https://www.energy-storage.news/canadian-solar-will-retrofit-300mwh-of-batteries-at-goldman-sachss-mustang-solar-plant-california/", "link2": "", "link3": "", "link4": ""}, {"name": "Papago", "city": "Maricopa County", "id": "75", "external_id": "66779", "state": "arizona", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "", "power_mw": "300", "customer": "Recurrent Energy", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.481046", "long": "-113.03863", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "", "project_website": "https://recurrentenergy.com/project/papago/", "link1": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/7254?fileID=56298", "link2": "", "link3": "", "link4": ""}, {"name": "Clay Tye", "city": "Upminster", "id": "76", "external_id": "", "state": "essex", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "Harmony Energy Ltd / Fotowatio Renewable Ventures (FRV)", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2021-09-06", "start_operation": "2024-03-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552193", "long": "0.297889", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.harmonyenergy.co.uk/general/work-starts-on-uks-largest-battery-project/", "link2": "https://x.com/Tesla_Megapack/status/1775254497973202985", "link3": "https://www.solarpowerportal.co.uk/harmony-energy-frv-energise-99mw-198mwh-bess-in-essex/", "link4": ""}, {"name": "Malita", "city": "Malita", "id": "77", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "6.398523", "long": "125.617282", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/fluence-completes-first-projects-in-470mw-470mwh-philippines-battery-order/", "link2": "", "link3": "", "link4": ""}, {"name": "Toledo", "city": "Toledo", "id": "78", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "10.388901", "long": "123.642096", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "link2": "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/", "link3": "", "link4": ""}, {"name": "Limay", "city": "Limay / Bataan", "id": "79", "external_id": "", "state": "", "country": "philippines", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "40", "customer": "SMC Global Power Holdings Corp", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "14.545475", "long": "120.599531", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.wartsila.com/media/news/01-06-2021-wartsila-finalises-commissioning-of-its-first-two-energy-storage-projects-in-the-philippines-2924518", "link2": "https://www.eqmagpro.com/wartsila-commissions-60mw-60mwh-of-battery-storage-in-philippines/", "link3": "", "link4": ""}, {"name": "Torrens Island", "city": "Adelaide", "id": "80", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "AGL Energy Limited", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-09-08", "start_construction": "2021-11-29", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.803262", "long": "138.523477", "coords_hint": "0", "use_case": "", "notes": "might become a 4h / 1000MWh system at a later stage, the coords are probably correct from the satellite image", "project_website": "", "link1": "https://www.wartsila.com/media/news/09-08-2021-agl-and-wartsila-advance-frame-agreement-with-first-energy-storage-project-on-path-to-grid-decarbonisation-2954567", "link2": "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-media-release---agl-breaks-ground-for-torrens-island-grid-sc", "link3": "", "link4": ""}, {"name": "Coventry Energy Superhub", "city": "Coventry", "id": "81", "external_id": "", "state": "west midlands", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "100", "customer": "Pivot Power (EDF Renewables)", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.404409", "long": "-1.525063", "coords_hint": "0", "use_case": "EV charging support", "notes": "", "project_website": "https://www.pivot-power.co.uk/our-projects/#", "link1": "https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/", "link2": "", "link3": "", "link4": ""}, {"name": "Bustleholmel Energy Superhub", "city": "Sandwell", "id": "82", "external_id": "", "state": "west midlands", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "100", "customer": "Pivot Power (EDF Renewables)", "owner": "", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.543952", "long": "-1.981982", "coords_hint": "0", "use_case": "EV charging support", "notes": "", "project_website": "https://www.pivot-power.co.uk/our-projects/#", "link1": "https://www.pivot-power.co.uk/press-release/pivot-power-expands-energy-superhub-model-across-west-midlands/", "link2": "", "link3": "", "link4": ""}, {"name": "Werne", "city": "Werne", "id": "83", "external_id": "SEE971932533266", "state": "nrw", "country": "germany", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "72", "customer": "RWE", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-26", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.674854", "long": "7.712175", "coords_hint": "0", "use_case": "frequency balancing", "notes": "", "project_website": "", "link1": "https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "link2": "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "link3": "", "link4": ""}, {"name": "Lingen / Emsland", "city": "Lingen", "id": "84", "external_id": "SEE905843309764", "state": "lower saxony", "country": "germany", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "45", "customer": "RWE", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-26", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.481565", "long": "7.300968", "coords_hint": "0", "use_case": "frequency balancing", "notes": "", "project_website": "", "link1": "https://www.rwe.com/unser-portfolio-leistungen/innovation-und-technik/projektvorhaben/megabatterie-plus-wasserkraft", "link2": "https://www.energy-storage.news/rwe-builds-117mw-of-battery-systems-paired-with-run-of-river-hydropower/", "link3": "", "link4": ""}, {"name": "Wunsiedel", "city": "Wunsiedel", "id": "85", "external_id": "", "state": "bavaria", "country": "germany", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Siemens", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.041482", "long": "12.029522", "coords_hint": "0", "use_case": "hydrogen plant support", "notes": "2021: just a letter of intent", "project_website": "", "link1": "https://www.energy-storage.news/siemens-and-fluence-to-build-renewables-integrating-100mw-200mwh-battery-project-in-germany/", "link2": "", "link3": "", "link4": ""}, {"name": "Luenen", "city": "Luenen", "id": "86", "external_id": "SEE905490507995", "state": "nrw", "country": "germany", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Mercedes Benz Energy / The Mobility House", "developer": "", "manufacturer": "", "type": "ev battery", "cells": "", "no_of_battery_units": "1000", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.619937", "long": "7.471047", "coords_hint": "1", "use_case": "frequency balancing", "notes": "second life EV battery storage with smart fortwo batteries", "project_website": "", "link1": "https://www.mobilityhouse.com/int_en/magazine/press-releases/worlds-largest-2nd-use-battery-storage-is-starting-up.html/", "link2": "https://www.youtube.com/watch?v=dDKVnp7_jrs", "link3": "", "link4": ""}, {"name": "Hanover / Herrenhausen", "city": "Hanover", "id": "87", "external_id": "SEE953605889740", "state": "lower saxony", "country": "germany", "capacity_mwh": "17", "estimate_mwh": "", "power_mw": "", "customer": "enercity", "owner": "Mercedes Benz Energy", "developer": "", "manufacturer": "", "type": "ev battery", "cells": "", "no_of_battery_units": "3240", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.398301", "long": "9.681795", "coords_hint": "1", "use_case": "frequency balancing", "notes": "first and second life EV battery storage with smart car batteries", "project_website": "", "link1": "https://www.daimler.com/sustainability/resources/battery-storage-daimler-and-enercity.html", "link2": "https://www.electrive.net/2017/10/23/daimler-batterie-ersatzteillager-fuer-elektroautos-am-netz/", "link3": "https://www.youtube.com/watch?v=dDKVnp7_jrs", "link4": ""}, {"name": "Permian Energy Center", "city": "Andrews Country", "id": "88", "external_id": "63255", "state": "texas", "country": "usa", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "40", "customer": "ExxonMobil", "owner": "Orsted", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-11-01", "start_operation": "2021-05-04", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.121853", "long": "-102.529659", "coords_hint": "1", "use_case": "420MW solar farm support", "notes": "built on a depleted oil field in the Permian Basin ** 2018: 12 year PPA with Exxon Mobil ** got exact location from the 2020 amended agreement doc on texas.gov site", "project_website": "https://orsted.com/en/our-business/solar-and-battery-storage/our-solar-and-storage-centers", "link1": "https://orsted.com/en/media/newsroom/news/2021/05/885212783010106", "link2": "https://www.nsenergybusiness.com/projects/permian-energy-centre/#", "link3": "https://comptroller.texas.gov/economy/local/ch313/agreement-docs-details.php?id=1411", "link4": ""}, {"name": "Carnegie Road", "city": "Liverpool", "id": "89", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "12", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Orsted", "developer": "", "manufacturer": "NEC Energy Solutions (LG)", "type": "40ft container", "cells": "", "no_of_battery_units": "3", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.419403", "long": "-2.928747", "coords_hint": "1", "use_case": "", "notes": "according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021 ** incident: fire at the site on 15.9.2020", "project_website": "https://orsted.com/en/our-business/solar-and-battery-storage/our-solar-and-storage-centers", "link1": "https://www.energy-storage.news/nec-delivers-orsteds-first-20mw-standalone-grid-battery-project/", "link2": "https://www.neces.com/experience#project-gallery", "link3": "https://www.energy-storage.news/fire-at-20mw-uk-battery-storage-plant-in-liverpool/", "link4": ""}, {"name": "Jardelund", "city": "Jardelund", "id": "90", "external_id": "SEE999790559914", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "51", "estimate_mwh": "", "power_mw": "48", "customer": "", "owner": "EnspireME (JV Eneco / Mitsubishi)", "developer": "", "manufacturer": "NEC Energy Solutions (LG)", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-10-01", "start_operation": "2018-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.851435", "long": "9.194775", "coords_hint": "1", "use_case": "frequency balancing", "notes": "according to energy-storage.news, NEC Energy Solutions was acquired by LG Energy solutions in September 2021", "project_website": "https://www.neces.com/project/jardelund-germany-48-mw-51-mwh-2/", "link1": "https://www.youtube.com/watch?v=UheTmGO7BN0", "link2": "https://www.energy-storage.news/50mwh-battery-completed-in-germany-claims-europes-largest-crown/", "link3": "", "link4": ""}, {"name": "Oxford Energy Superhub", "city": "Cowley / Oxford", "id": "91", "external_id": "", "state": "", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Pivot Power (EDF Renewables)", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.709722", "long": "-1.189592", "coords_hint": "1", "use_case": "EV charging support", "notes": "Exact location from burnell website pictures", "project_website": "https://energysuperhuboxford.org/", "link1": "https://www.euractiv.com/section/electricity/news/uks-first-grid-scale-battery-storage-system-comes-online-in-oxford/", "link2": "https://www.burnell.uk.com/energy-superhub-oxford/", "link3": "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "link4": ""}, {"name": "Kemsley Energy Superhub", "city": "Kemsley", "id": "92", "external_id": "7368", "state": "kent", "country": "uk", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Pivot Power (EDF Renewables)", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "construction start date from youtube video", "project_website": "https://www.pivot-power.co.uk/our-projects/", "link1": "https://www.wartsila.com/energy/learn-more/references/utilities/energy-storage-pivot-power", "link2": "https://www.youtube.com/watch?v=od2h3syN8P4&t=2s", "link3": "", "link4": ""}, {"name": "Mardyck", "city": "Dunkirk", "id": "93", "external_id": "", "state": "", "country": "france", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "25", "customer": "RTE", "owner": "Total", "developer": "", "manufacturer": "Saft", "type": "Intensium Max 20 High Energy (20ft container)", "cells": "NMC", "no_of_battery_units": "11", "status": "operation", "date_first_heard": "", "start_construction": "2020-10-01", "start_operation": "2021-02-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.029549", "long": "2.252929", "coords_hint": "2", "use_case": "frequency balancing", "notes": "saft is owned by total", "project_website": "", "link1": "https://www.energy-storage.news/frances-biggest-battery-storage-system-at-25mw-goes-into-operation/", "link2": "https://totalenergies.com/media/news/press-releases/total-build-largest-battery-based-energy-storage-project-france", "link3": "https://www.saftbatteries.com/products-solutions/products/intensium\ufffd-max-20-high-energy", "link4": ""}, {"name": "Ringo-Vingeanne", "city": "Jalancourt", "id": "94", "external_id": "", "state": "Cote-d\u2019or", "country": "france", "capacity_mwh": "24", "estimate_mwh": "", "power_mw": "12", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Nidec ASI", "type": "40ft container", "cells": "LG Chem NMC", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-10-01", "start_operation": "2021-07-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "47.510967", "long": "5.367566", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "rte website and energy storage news list two different capacities for site ** exact location from rte press photo which is close to lake ** 2021: it is an expirment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/actualites/le-projet-ringo-de-rte-accueille-ses-premiers-equipements-en-cote-dor", "link3": "https://www.energy-storage.news/french-grid-operators-software-controlled-battery-experiment-begins/", "link4": ""}, {"name": "Ringo-Bellac", "city": "Bellac", "id": "95", "external_id": "", "state": "haute-vienne", "country": "france", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "10", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Saft", "type": "", "cells": "Tianneng", "no_of_battery_units": "12", "status": "construction", "date_first_heard": "", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "46.104588", "long": "1.04347", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "2021: experiment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-renouvelable-lexperimentation-ringo-bellac-haute-vienne", "link3": "", "link4": ""}, {"name": "Ringo-Ventavon", "city": "Ventavon", "id": "96", "external_id": "", "state": "", "country": "france", "capacity_mwh": "30", "estimate_mwh": "", "power_mw": "10", "customer": "RTE", "owner": "", "developer": "", "manufacturer": "Blue Solutions", "type": "Blue LMP", "cells": "Bollore LMP", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "44.344414", "long": "5.915866", "coords_hint": "1", "use_case": "virtual transmission lines", "notes": "2021: experiment which lasts for 3 years", "project_website": "", "link1": "https://www.energy-storage.news/frances-grid-battery-experiments-take-aim-at-creating-market-fit-for-carbon-neutrality/", "link2": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-lexperimentation-ringo-ventavon", "link3": "https://www.engie-solutions.com/en/news/renewable-energy-storage", "link4": ""}, {"name": "Netzbooster Kupferzell", "city": "Kupferzell", "id": "97", "external_id": "", "state": "bw", "country": "germany", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "TransnetBW", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-01", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "cost_million": "200", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "49.232801", "long": "9.694664", "coords_hint": "0", "use_case": "virtual transmission lines", "notes": "this is a pilot project and still it takes 5 years to build, will be interesting how long they will take for real projects then, ca 200 Million Euro costs", "project_website": "https://www.transnetbw.de/de/netzentwicklung/projekte/netzbooster-pilotanlage/projektueberblick", "link1": "https://www.transnetbw.de/files/pdf/netzentwicklung/projekte/netzbooster-pilotanlage/Vorstellung_Netzbooster.pdf", "link2": "https://www.energy-storage.news/fluence-building-250mw-grid-booster-battery-storage-system-for-german-tso-transnetbw/", "link3": "", "link4": ""}, {"name": "Edwards", "city": "Edwards", "id": "98", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.413627", "long": "-88.058471", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, {"name": "Havana", "city": "Havana", "id": "99", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.279711", "long": "-90.079133", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, {"name": "EEI/Joppa", "city": "Joppa", "id": "100", "external_id": "", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "37", "customer": "", "owner": "Vistra Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-16", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.211346", "long": "-88.859049", "coords_hint": "0", "use_case": "", "notes": "the last of 8 projects will be done in 2025, so most likely earlier", "project_website": "", "link1": "https://www.energy-storage.news/vistra-says-extraordinary-leadership-enabling-illinois-transition-away-from-coal/", "link2": "https://investor.vistracorp.com/2021-09-15-State-of-Illinois-Enacts-Landmark-Energy-Transition-Legislation-That-Includes-Vistras-Coal-to-Solar-Energy-Storage-Initiative", "link3": "", "link4": ""}, {"name": "Arroyo", "city": "McKinley County", "id": "101", "external_id": "63172", "state": "new mexico", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "150", "customer": "PNM", "owner": "DE Shaw Renewable Investments (DSRI)", "developer": "Affordable Solar", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-03", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "450", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.9703", "long": "-107.5631", "coords_hint": "1", "use_case": "300MW solar farm support", "notes": "2021 Sep: project acquired by DSRI from Centaurus Renewable Energy ** the testimony link has a lot of info ** got the location info from the gem wiki", "project_website": "", "link1": "https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/", "link2": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link3": "https://www.pnmforwardtogether.com/assets/uploads/replacement-plan-filing-july2019/07_Thomas_G_Fallgrenl.pdf", "link4": "https://www.gem.wiki/Arroyo_Solar_Energy_Storage_Hybrid#cite_note-USEia2022March-1"}, {"name": "Jicarilla", "city": "", "id": "102", "external_id": "", "state": "new mexico", "country": "usa", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "20", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "93", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.269283", "long": "-107.562816", "coords_hint": "0", "use_case": "50MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, {"name": "San Juan 1", "city": "", "id": "103", "external_id": "66574", "state": "new mexico", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "430", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.804042", "long": "-108.445356", "coords_hint": "0", "use_case": "200MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, {"name": "201LC 8me", "city": "", "id": "104", "external_id": "", "state": "new mexico", "country": "usa", "capacity_mwh": "120", "estimate_mwh": "", "power_mw": "30", "customer": "PNM", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "188", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "35.619911", "long": "-107.815013", "coords_hint": "0", "use_case": "100MW solar farm support", "notes": "", "project_website": "", "link1": "https://reneweconomy.com.au/new-mexico-utility-to-replace-coal-plant-with-four-solar-and-battery-projects-31989/", "link2": "", "link3": "", "link4": ""}, {"name": "Gemini", "city": "Las Vegas", "id": "105", "external_id": "63352", "state": "nevada", "country": "usa", "capacity_mwh": "1400", "estimate_mwh": "", "power_mw": "380", "customer": "", "owner": "Primergy Solar (Quinbrook)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-13", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "cost_million": "1000", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "36.474167", "long": "-114.784706", "coords_hint": "1", "use_case": "690MW solar farm support", "notes": "from the planning docs, it seems battery containers will be split out across the solar farm, that is why the location was set to exact", "project_website": "https://www.primergysolar.com/portfolio", "link1": "https://www.energy-storage.news/us-dept-of-interior-approves-690mw-nevada-solar-plant-with-1400mwh-energy-storage-component/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/100498/570", "link3": "", "link4": ""}, {"name": "Iron Point", "city": "Humboldt County", "id": "106", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "NV Energy", "developer": "Primergy Solar (Quinbrook)", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.900046", "long": "-117.291845", "coords_hint": "1", "use_case": "250MW solar farm support", "notes": "", "project_website": "", "link1": "https://eplanning.blm.gov/eplanning-ui/project/2000966", "link2": "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "link3": "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/", "link4": ""}, {"name": "Hot Pot", "city": "Humboldt County", "id": "107", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "1120", "estimate_mwh": "", "power_mw": "280", "customer": "", "owner": "NV Energy", "developer": "Primergy Solar (Quinbrook)", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-03", "start_construction": "", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.886191", "long": "-117.104592", "coords_hint": "0", "use_case": "350MW solar farm support", "notes": "in the planning doc the project name also includes iron pot 2 solar plant", "project_website": "", "link1": "https://www.energy-storage.news/solar-plus-batteries-chosen-to-replace-522mw-nevada-coal-plant/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/2013178/510", "link3": "https://renewablesnow.com/news/avangrid-renewables-primergy-to-jointly-push-600-mw-nevada-solar-storage-portfolio-748533/", "link4": ""}, {"name": "Dry Lake", "city": "Clark County", "id": "108", "external_id": "63933", "state": "nevada", "country": "usa", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "NV Energy", "developer": "NV Energy", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.419928", "long": "-114.895856", "coords_hint": "1", "use_case": "150mw solar farm support", "notes": "in the planning doc, they list 3 BESS options, picked option 1 for the coordinates (but might be wrong)", "project_website": "", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "https://eplanning.blm.gov/eplanning-ui/project/2000468/510", "link3": "", "link4": ""}, {"name": "Boulder Solar III", "city": "Clark County", "id": "109", "external_id": "", "state": "nevada", "country": "usa", "capacity_mwh": "232", "estimate_mwh": "", "power_mw": "58", "customer": "", "owner": "NV Energy", "developer": "174 PowerGlobal / KOMIPO", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.827801", "long": "-114.947397", "coords_hint": "0", "use_case": "128MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "", "link3": "", "link4": ""}, {"name": "Chuckwella", "city": "Clark County", "id": "110", "external_id": "64558", "state": "nevada", "country": "usa", "capacity_mwh": "720", "estimate_mwh": "", "power_mw": "180", "customer": "", "owner": "NV Energy", "developer": "EDF Renewables", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-26", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.501562", "long": "-114.818882", "coords_hint": "0", "use_case": "200 MW solar farm support", "notes": "", "project_website": "https://www.chuckwallasolarprojectseis.com/about-the-projects.html", "link1": "https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/", "link2": "", "link3": "", "link4": ""}, {"name": "Agua Fria / Bolster Substation", "city": "Glendale / Phoenix", "id": "111", "external_id": "141", "state": "arizona", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "Salt River Project (SRP)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "32", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.553691", "long": "-112.212654", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://media.srpnet.com/srps-largest-energy-storage-facility-now-online/", "link2": "https://www.energy-storage.news/arizona-utility-srp-brings-online-25mw-100mwh-tesla-megapack-battery-storage-project/", "link3": "", "link4": ""}, {"name": "Cascade", "city": "Stockton", "id": "112", "external_id": "61801", "state": "california", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "25", "customer": "PG&E", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "SYL Battery (Risen Energy)", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-24", "start_construction": "", "start_operation": "", "start_estimated": "2022Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "37.921103", "long": "-121.24114", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://ceqanet.opr.ca.gov/2020090414/2", "link2": "https://www.energy-storage.news/broad-reach-power-orders-118mwh-ess-equipment-for-california-project-from-syl-battery/", "link3": "", "link4": ""}, {"name": "Cranberry Point", "city": "Carver", "id": "113", "external_id": "62844", "state": "massachusetts", "country": "usa", "capacity_mwh": "300", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.896693", "long": "-70.786639", "coords_hint": "1", "use_case": "", "notes": "got the info about tesla as manufacturer from twitter thread and FAQ on the project website", "project_website": "https://cranberrypointenergystorage.com/", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, {"name": "Cross Town", "city": "Gorham", "id": "114", "external_id": "66606", "state": "maine", "country": "usa", "capacity_mwh": "350", "estimate_mwh": "", "power_mw": "175", "customer": "", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-11", "start_construction": "", "start_operation": "", "start_estimated": "2024H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "43.68383", "long": "-70.39786", "coords_hint": "1", "use_case": "", "notes": "pretty sure the coords are correct from the rendered image and the substation found on cross town trail via google maps ** got the info about tesla from twitter thread as all plus power project seem to be tesla", "project_website": "https://www.crosstownenergystorage.com/about", "link1": "https://www.greentechmedia.com/articles/read/plus-power-breaks-open-new-england-market-for-massive-batteries", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, {"name": "Bat Cave", "city": "Mason County", "id": "115", "external_id": "64312", "state": "texas", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-09-15", "start_operation": "", "start_estimated": "2021", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.7345278", "long": "-99.2311111", "coords_hint": "1", "use_case": "", "notes": "location verified from photo on broad reach power website", "project_website": "https://broadreachpower.com/projects/", "link1": "https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/", "link2": "", "link3": "", "link4": ""}, {"name": "North Fork", "city": "Williamson County", "id": "116", "external_id": "64317", "state": "texas", "country": "usa", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Broad Reach Power", "developer": "Plus Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2020-09-15", "start_operation": "", "start_estimated": "2021", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.655335", "long": "-97.883739", "coords_hint": "0", "use_case": "", "notes": "location from the broad reach power website, but do not think it is correct", "project_website": "https://broadreachpower.com/projects/", "link1": "https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/", "link2": "", "link3": "", "link4": ""}, {"name": "Coso", "city": "Coso Junction, Little Lake", "id": "117", "external_id": "63943", "state": "california", "country": "usa", "capacity_mwh": "240", "estimate_mwh": "", "power_mw": "60", "customer": "", "owner": "Arevon", "developer": "Arevon", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-08-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.056513", "long": "-117.858611", "coords_hint": "0", "use_case": "", "notes": "took the location from arevon website, but on google maps satellite seems like an unlikely location, this project is most likely tesla given that arevon has signed a large deal with tesla", "project_website": "https://arevonenergy.com/location/coso/", "link1": "https://arevonenergy.com/arevon-signs-agreement-for-2-gw-6-gwh-of-tesla-megapack-systems/", "link2": "", "link3": "", "link4": ""}, {"name": "Mohammed bin Rashid Al Maktoum Solar Park", "city": "Dubai", "id": "118", "external_id": "", "state": "", "country": "uae", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "1", "customer": "", "owner": "Dubai Electricity and Water Authority (DEWA)", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-09-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.765375", "long": "55.367443", "coords_hint": "0", "use_case": "1000MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.asiantechpress.com/dubai-launches-pilot-project-for-energy-storage-with-tesla-megapack.html", "link2": "https://www.pv-magazine.com/2021/09/27/teslas-storage-facility-comes-online-at-mohammed-bin-rashid-solar-park-in-dubai/", "link3": "", "link4": ""}, {"name": "Bouldercombe", "city": "", "id": "119", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Genex Power", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "40", "status": "operation", "date_first_heard": "2021-10-05", "start_construction": "", "start_operation": "2023-11-10", "start_estimated": "2023H1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-23.537188", "long": "150.48991", "coords_hint": "3", "use_case": "", "notes": "used the date of the tweet as operation start date", "project_website": "https://www.genexpower.com.au/bouldercombe-battery-project.html", "link1": "https://www.energy-storage.news/tesla-megapacks-picked-for-genex-powers-50mw-100mwh-battery-project-in-queensland-australia/", "link2": "https://cleantechnica.com/2021/10/05/genex-power-will-use-40-tesla-megapacks-for-bouldercome-battery-project/", "link3": "https://twitter.com/SawyerMerritt/status/1722857295078383700", "link4": ""}, {"name": "Poolbeg", "city": "Dublin", "id": "120", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "75", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.338696", "long": "-6.205066", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://blog.fluenceenergy.com/esb-fluence-complete-deal-largest-energy-storage-portfolio-europe", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Wall", "city": "Dublin", "id": "121", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "60", "estimate_mwh": "", "power_mw": "30", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.338662", "long": "-6.191852", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://blog.fluenceenergy.com/esb-fluence-complete-deal-largest-energy-storage-portfolio-europe", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aghada", "city": "Cork", "id": "122", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "38", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.833728", "long": "-8.237095", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.pv-magazine.com/2021/01/08/irish-esb-to-add-100-mwh-of-fluence-storage-to-its-portfolio/", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Inchicore", "city": "Dublin", "id": "123", "external_id": "", "state": "", "country": "ireland", "capacity_mwh": "60", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.335521", "long": "-6.336714", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.pv-magazine.com/2021/01/08/irish-esb-to-add-100-mwh-of-fluence-storage-to-its-portfolio/", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Xlinks (Morocco UK)", "city": "", "id": "124", "external_id": "", "state": "", "country": "morocco", "capacity_mwh": "20000", "estimate_mwh": "", "power_mw": "5000", "customer": "", "owner": "xlinks", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-04", "start_construction": "", "start_operation": "", "start_estimated": "2027", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "28.127867", "long": "-11.599926", "coords_hint": "0", "use_case": "7000MW solar farm support ** 3500MW wind farm support ** remote generation for UK (3800km HVDC cable)", "notes": "2021: this is early stage and not guaranteed to happened, but putting it there as it is a very ambitious project and more of those are needed ** construction to start in 2025, the first systems to go onine in 2027 ** PPA at 48 GBP / Mwh ** the youtube video is a great overview", "project_website": "https://xlinks.co/morocco-uk-power-project/", "link1": "https://www.greentechmedia.com/articles/read/xlinks-revives-desertecs-dream-with-a-few-twists", "link2": "https://www.youtube.com/watch?v=iJunxkln578", "link3": "", "link4": ""}, {"name": "Burwell", "city": "Burwell", "id": "125", "external_id": "7272", "state": "cambridgeshire", "country": "uk", "capacity_mwh": "56", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "SMS Plc", "manufacturer": "Trina Storage / CATL", "type": "", "cells": "CATL LFP", "no_of_battery_units": "157", "status": "construction", "date_first_heard": "2021-10-12", "start_construction": "", "start_operation": "", "start_estimated": "2022Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "52.27859", "long": "0.316193", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/energy-storage-product-launches-in-europe-from-major-chinese-solar-companies-trina-sungrow/", "link2": "https://www.youtube.com/watch?v=PT1vRQdYuzE", "link3": "", "link4": ""}, {"name": "Clermont", "city": "Lindenhurst", "id": "126", "external_id": "64236", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.701265", "long": "-73.366732", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, {"name": "Intrepid", "city": "Oceanside", "id": "127", "external_id": "", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "300", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.616803", "long": "-73.646401", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, {"name": "Swiftsure", "city": "Staten Island", "id": "128", "external_id": "64235", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "650", "customer": "", "owner": "Hecate Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "40.602891", "long": "-74.178441", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "https://www.hecateenergy.com/projects/", "link1": "https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-11-19-20.xlsx", "link2": "", "link3": "", "link4": ""}, {"name": "Chapel Farm", "city": "Luton", "id": "129", "external_id": "7058", "state": "bedfordshire", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Tag Energy", "developer": "Harmony Energy", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2023-06-16", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "51.925835", "long": "-0.49999903", "coords_hint": "0", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://twitter.com/Tesla_Megapack/status/1669479285848182784", "link3": "", "link4": ""}, {"name": "Jamesfield Farm", "city": "Abernethy", "id": "130", "external_id": "10863", "state": "fife", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "Tag Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "LFP", "no_of_battery_units": "26", "status": "operation", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "2024-03-19", "start_estimated": "2023Q1", "cost_million": "50", "cost_currency": "GBP", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "extrapolated the cost from the 60 million investment for 60% and then split it across both projects mentioned in article", "project_website": "", "link1": "https://reneweconomy.com.au/tag-energy-to-use-tesla-megapacks-in-two-new-battery-storage-projects-in-uk/", "link2": "https://www.harmonyenergyplanning.co.uk/jamesfield/", "link3": "", "link4": ""}, {"name": "Scampitella", "city": "", "id": "131", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "72", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / fluence", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.082553", "long": "15.342974", "coords_hint": "1", "use_case": "", "notes": "fluence claims it is from them, but in the nidec pdf the also mention it, not quite sure...", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://blog.fluenceenergy.com/enel-x-taps-fluence-gridstack-storage-product-to-deliver-fast-reserve-services-in-italy", "link3": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link4": ""}, {"name": "Ginestra", "city": "", "id": "132", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / nidec", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.285189", "long": "15.072551", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link3": "https://www.ngk-insulators.com/en/product/nas-solutions.html", "link4": ""}, {"name": "Flumeri", "city": "", "id": "133", "external_id": "", "state": "", "country": "italy", "capacity_mwh": "80", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "Terna", "developer": "", "manufacturer": "NGK / nidec", "type": "", "cells": "sodium sulfur", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "41.067966", "long": "15.123332", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.terna.it/en/electric-system/system-innovation/pilot-storage-projects", "link2": "https://www.nidec-industrial.com/wp-content/uploads/2017/07/DEP2015.03.30.04EN.Case-Study_Terna.pdf", "link3": "", "link4": ""}, {"name": "Thailand (name tbd)", "city": "", "id": "134", "external_id": "", "state": "", "country": "thailand", "capacity_mwh": "136", "estimate_mwh": "", "power_mw": "45", "customer": "", "owner": "Super Energy", "developer": "", "manufacturer": "sungrow", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-16", "start_construction": "", "start_operation": "", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "14.334678", "long": "100.052398", "coords_hint": "0", "use_case": "49MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/sungrow-is-supplier-to-thai-solar-plus-storage-project-featuring-southeast-asias-biggest-bess/", "link2": "", "link3": "", "link4": ""}, {"name": "Loy Yang", "city": "", "id": "135", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "AGL Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.254578", "long": "146.581076", "coords_hint": "0", "use_case": "at coal power plant", "notes": "", "project_website": "", "link1": "https://www.agl.com.au/about-agl/media-centre/asx-and-media-releases/2021/november/agl-loy-yang-s-proposed-battery-receives-planning-approval", "link2": "", "link3": "", "link4": ""}, {"name": "Liddell", "city": "", "id": "136", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "AGL Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-32.371786", "long": "150.972683", "coords_hint": "0", "use_case": "at coal power plant", "notes": "could not find mwh info", "project_website": "", "link1": "https://www.pv-magazine-australia.com/2021/05/07/agl-pushes-ahead-with-renewable-energy-plans-for-liddell-site/", "link2": "", "link3": "", "link4": ""}, {"name": "Waikato (name tbd)", "city": "", "id": "137", "external_id": "", "state": "", "country": "new zealand", "capacity_mwh": "", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "WEL Networks", "developer": "Infratec", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-10-18", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "17", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "-37.519913", "long": "175.054654", "coords_hint": "0", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/new-zealands-first-grid-scale-battery-storage-system-project-nears-start-of-construction/", "link2": "", "link3": "", "link4": ""}, {"name": "Hazelwood", "city": "LaTrobe Valley", "id": "138", "external_id": "", "state": "victoria", "country": "australia", "capacity_mwh": "150", "estimate_mwh": "", "power_mw": "150", "customer": "", "owner": "Macquarie\u2019s Green Investment Group / Engie", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2021-12-01", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-38.271456", "long": "146.390309", "coords_hint": "0", "use_case": "at coal power plant", "notes": "will benefit from unused transmission capacity of old power plant", "project_website": "", "link1": "https://www.energy-storage.news/150mw-privately-funded-battery-project-is-latest-in-australia-to-repurpose-fossil-fuel-plant-site/", "link2": "", "link3": "", "link4": ""}, {"name": "Vilnius", "city": "", "id": "139", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "54.651925", "long": "25.240645", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, {"name": "Siauliai", "city": "", "id": "140", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "55.916586", "long": "23.307078", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, {"name": "Alytus", "city": "", "id": "141", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "54.405809", "long": "24.011371", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, {"name": "Utena", "city": "", "id": "142", "external_id": "", "state": "", "country": "lithuania", "capacity_mwh": "50", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "EPSO-G / Energy Cells", "developer": "", "manufacturer": "fluence", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-08", "start_construction": "", "start_operation": "", "start_estimated": "2022Q3", "cost_million": "27", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "55.505378", "long": "25.595541", "coords_hint": "0", "use_case": "transmission network support", "notes": "split capacity and costs in 4 projects, only the sum mentioned in article", "project_website": "", "link1": "https://www.energy-storage.news/government-led-consortium-launches-200mw-rollout-of-battery-storage-to-aid-lithuanias-transmission-network/", "link2": "", "link3": "", "link4": ""}, {"name": "Searcy Solar Hybrid", "city": "", "id": "143", "external_id": "62617", "state": "arkansas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Searcy Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Red Antelope Solar & Energy Storage Farm", "city": "", "id": "144", "external_id": "64208", "state": "arizona", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "302PN 8me LLC", "developer": "8 minute", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "36.712788", "long": "-111.290085", "coords_hint": "1", "use_case": "400MW solar farm support", "notes": "", "project_website": "", "link1": "https://lakepowellchronicle.com/article/4000-acre-solar-project-proposed-near-page", "link2": "", "link3": "", "link4": ""}, {"name": "Atlas", "city": "", "id": "145", "external_id": "63798", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "El Sol BESS", "city": "", "id": "146", "external_id": "62964", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Foothills Solar Plant Hybrid", "city": "", "id": "147", "external_id": "57997", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "76", "power_mw": "38", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gila Bend Hybrid", "city": "", "id": "148", "external_id": "59020", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wilmot Energy Center LLC", "city": "", "id": "149", "external_id": "64426", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Wilmot Energy Center LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cotton Center Solar Hybrid", "city": "", "id": "151", "external_id": "57561", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paloma Solar Hybrid", "city": "", "id": "152", "external_id": "57562", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hyder Solar Hybrid", "city": "", "id": "153", "external_id": "57563", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "16", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hyder II Hybrid", "city": "", "id": "154", "external_id": "58383", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Star Hybrid", "city": "", "id": "155", "external_id": "62965", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Star Hybrid", "city": "", "id": "156", "external_id": "59444", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Public Service Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bellefield 2 Solar & Energy Storage Farm", "city": "", "id": "157", "external_id": "64209", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "26SB 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bellefield Solar and Energy Storage Farm", "city": "", "id": "158", "external_id": "64210", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "50LW 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kingsley Solar Farm", "city": "", "id": "159", "external_id": "64634", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "720", "power_mw": "360", "customer": "", "owner": "90FI 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aratina Solar Center 2", "city": "", "id": "161", "external_id": "64215", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "45MG 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Big Rock Solar Farm", "city": "", "id": "162", "external_id": "64636", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "92JT 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sienna Solar Farm", "city": "", "id": "163", "external_id": "64632", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "99MT 8me, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eland Solar & Storage Center, Phase 2 Hybrid", "city": "", "id": "164", "external_id": "61169", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "69SV 8me LLC", "developer": "Arevon", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "150", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "35.198008", "long": "-117.994", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1760848348607594844", "link2": "https://renewablesnow.com/news/arevon-secures-over-usd-1bn-for-california-solar-plus-storage-project-849335/", "link3": "https://x.com/Tesla_Megapack/status/1794120454883659833", "link4": ""}, {"name": "Daggett 3", "city": "", "id": "165", "external_id": "64852", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "288", "power_mw": "144", "customer": "", "owner": "Daggett Solar Power 3 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arlington Energy Center II", "city": "", "id": "166", "external_id": "64481", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "132", "customer": "", "owner": "Arlington Energy Center II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Daggett 2", "city": "", "id": "167", "external_id": "64851", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "262", "power_mw": "131", "customer": "", "owner": "Daggett Solar Power 2 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fifth Standard Solar PV, LLC (Hybrid)", "city": "", "id": "168", "external_id": "64197", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "234", "power_mw": "117", "customer": "", "owner": "RWE Renewables Americas LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Resurgence Solar", "city": "", "id": "169", "external_id": "64489", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "230", "power_mw": "115", "customer": "", "owner": "Resurgence Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Luna Storage", "city": "", "id": "170", "external_id": "63685", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Luna Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sanborn BESS 1", "city": "", "id": "171", "external_id": "64712", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sanborn BESS 2", "city": "", "id": "172", "external_id": "64713", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Noosa Energy Storage LLC", "city": "", "id": "173", "external_id": "64531", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Noosa Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "JVR Energy Park LLC", "city": "", "id": "174", "external_id": "64428", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "JVR Energy Park LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blythe Solar 110, LLC", "city": "", "id": "175", "external_id": "60093", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "63", "customer": "", "owner": "Blythe Solar 110, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cal Flats BESS", "city": "", "id": "176", "external_id": "63930", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "CD Arevon USA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Slate Hybrid", "city": "", "id": "177", "external_id": "63727", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "RE Slate 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aratina Solar Center 1 Hybrid", "city": "", "id": "178", "external_id": "61167", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "91MC 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maverick Solar 6, LLC", "city": "", "id": "179", "external_id": "64105", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Maverick Solar 6, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hudson - High Desert Hybrid", "city": "", "id": "180", "external_id": "64624", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Goldman Sachs Renewable Power Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arlington Energy Center III", "city": "", "id": "181", "external_id": "64564", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "94", "power_mw": "47", "customer": "", "owner": "Arlington Energy Center III", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Painter Energy Storage", "city": "", "id": "182", "external_id": "62729", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Painter Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fallbrook Energy Storage", "city": "", "id": "183", "external_id": "61365", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "EDPR CA Solar Park VI LLC (CA) Hybrid", "city": "", "id": "184", "external_id": "62892", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "EDPR CA Solar Park VI LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dynegy Oakland Power Plant", "city": "", "id": "185", "external_id": "6211", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72.6", "power_mw": "36.3", "customer": "", "owner": "Dynegy Oakland, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E1A", "city": "", "id": "186", "external_id": "64878", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Harvest II LLC", "city": "", "id": "187", "external_id": "64103", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "35", "customer": "", "owner": "Desert Harvest II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E2", "city": "", "id": "188", "external_id": "64879", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Top Gun Energy Storage", "city": "", "id": "189", "external_id": "61366", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Johanna Energy Center, LLC", "city": "", "id": "190", "external_id": "63843", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Renz Energy Storage", "city": "", "id": "191", "external_id": "63529", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Pacific Gas & Electric Co.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E3 ", "city": "", "id": "192", "external_id": "64877", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Silverstrand Grid Energy Storage System", "city": "", "id": "193", "external_id": "63735", "state": "california", "country": "usa", "capacity_mwh": "46", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Silverstrand Grid, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "15", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.205195", "long": "-119.058256", "coords_hint": "3", "use_case": "", "notes": "Using 3.1MWh to get from the packs to capacity", "project_website": "", "link1": "https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/", "link2": "", "link3": "", "link4": ""}, {"name": "Camino Solar", "city": "", "id": "194", "external_id": "63508", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Avangrid Renewables LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stanton Energy Reliability Center Hybrid", "city": "", "id": "195", "external_id": "60698", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Wellhead Energy, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Henrietta D Energy Storage LLC", "city": "", "id": "196", "external_id": "60641", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Convergent Energy and Power LP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Energy Johanna Facility", "city": "", "id": "197", "external_id": "62889", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Goleta Grid Resiliency", "city": "", "id": "198", "external_id": "63736", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "esVolta LP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chevron - Lost Hills Hybrid", "city": "", "id": "199", "external_id": "63545", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Goldman Sachs Renewable Power Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sierra Energy Storage, LLC", "city": "", "id": "200", "external_id": "61803", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Enel Green Power NA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sierra", "city": "", "id": "201", "external_id": "64320", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kearny North Energy Storage", "city": "", "id": "202", "external_id": "64612", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kearny South Energy Storage", "city": "", "id": "203", "external_id": "64614", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Neptune Energy Center Hybrid", "city": "", "id": "204", "external_id": "63731", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "Neptune Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thunder Wolf Energy Center Hybrid", "city": "", "id": "205", "external_id": "63776", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Thunder Wolf Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pike Solar Hybrid", "city": "", "id": "206", "external_id": "64212", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Pike Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pure Hedge LLC", "city": "", "id": "207", "external_id": "50736", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Pure Hedge LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trenton", "city": "", "id": "208", "external_id": "63995", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Duke Energy Florida, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cool Springs Solar (Hybrid)", "city": "", "id": "209", "external_id": "63721", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Cool Springs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kupehau", "city": "", "id": "210", "external_id": "63799", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES Maui Kuihelani Solar Hybrid", "city": "", "id": "211", "external_id": "64256", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ho'Ohana Solar 1", "city": "", "id": "212", "external_id": "63723", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "104", "power_mw": "52", "customer": "", "owner": "Ho'Ohana Solar 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES Waikoloa Solar Hybrid", "city": "", "id": "213", "external_id": "63900", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hale Kuawehi Solar Hybrid", "city": "", "id": "214", "external_id": "62529", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Hale Kuawehi Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kahana Solar, LLC", "city": "", "id": "215", "external_id": "64095", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Kahana Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paeahu Solar Hybrid", "city": "", "id": "216", "external_id": "62534", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Paeahu Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barbers Point Solar, LLC", "city": "", "id": "217", "external_id": "64094", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Barbers Point Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES Kekaha Solar, LLC Hybrid", "city": "", "id": "218", "external_id": "63280", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES West Oahu Solar Hybrid", "city": "", "id": "219", "external_id": "64656", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "12.5", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Outer Cape Community Battery", "city": "", "id": "220", "external_id": "62604", "state": "massachusetts", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Eversource", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Portland ESS, LLC", "city": "", "id": "221", "external_id": "64616", "state": "maine", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "South Portland ESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "OE_MS5", "city": "", "id": "222", "external_id": "64529", "state": "mississippi", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "OE_MS5", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Haymaker Hybrid", "city": "", "id": "223", "external_id": "63878", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Haymaker Energy Project LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grissom Solar, LLC", "city": "", "id": "224", "external_id": "64450", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Grissom Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rockmont Solar and Storage Project", "city": "", "id": "225", "external_id": "64216", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "201LC 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Taos Mesa Energy Facility Hybrid", "city": "", "id": "226", "external_id": "63728", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Taos Mesa Energy Facility, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Southern Bighorn Solar Hybrid", "city": "", "id": "227", "external_id": "63113", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "300MS 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Townsite Solar Project Hybrid", "city": "", "id": "228", "external_id": "60654", "state": "nevada", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "180", "power_mw": "90", "customer": "Arevon", "owner": "Townsite Solar, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "35.935805", "long": "-114.869386", "coords_hint": "1", "use_case": "190MW solar farm support", "notes": "", "project_website": "", "link1": "https://www.tesla.com/videos/townsite-solar-storage", "link2": "https://arevonenergy.com/location/townsite/", "link3": "", "link4": ""}, {"name": "Arrow Canyon Solar Hybrid", "city": "", "id": "229", "external_id": "62248", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Arrow Canyon Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dodge Flat", "city": "", "id": "230", "external_id": "63913", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Dodge Flat Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fish Springs", "city": "", "id": "231", "external_id": "64148", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Fish Springs Ranch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Battle Mountain Solar Project", "city": "", "id": "232", "external_id": "61098", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "NISA Electric Generation Project", "city": "", "id": "233", "external_id": "61331", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "NYC ENERGY LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "NY2 Battery", "city": "", "id": "234", "external_id": "63584", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Willis Battery Storage", "city": "", "id": "235", "external_id": "63238", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "New York Power Authority", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Orangeville Storage", "city": "", "id": "236", "external_id": "64686", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Skeleton Creek Energy Center Hybrid", "city": "", "id": "237", "external_id": "62494", "state": "oklahoma", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Skeleton Creek Energy Center", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rush Springs Energy Storage (BA)", "city": "", "id": "238", "external_id": "63458", "state": "oklahoma", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Rush Springs Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-03-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wheatridge Hybrid", "city": "", "id": "239", "external_id": "62745", "state": "oregon", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Wheatridge Wind Holdings, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vonore Battery Energy Storage System", "city": "", "id": "240", "external_id": "64255", "state": "tennessee", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Tennessee Valley Authority", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blue Jay Solar I, LLC", "city": "", "id": "241", "external_id": "64672", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "420", "power_mw": "210", "customer": "", "owner": "Blue Jay Solar I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Azure Sky Wind Project, LLC Hybrid", "city": "", "id": "242", "external_id": "64164", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "120", "customer": "", "owner": "Azure Sky Wind Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chisholm Grid Energy Storage System", "city": "", "id": "243", "external_id": "63737", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Chisholm Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Madero Grid", "city": "", "id": "244", "external_id": "63757", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Madero Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX17 Nickel Prairie Storage", "city": "", "id": "245", "external_id": "63880", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX18 Cottage Meadow Storage", "city": "", "id": "246", "external_id": "63879", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ignacio Grid Energy Storage System", "city": "", "id": "247", "external_id": "64089", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Ignacio Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Forest Grove - Dodd", "city": "", "id": "248", "external_id": "64131", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Renewable Energy Ventures LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Azure Sky Solar", "city": "", "id": "249", "external_id": "63905", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "154", "power_mw": "77", "customer": "", "owner": "Azure Sky Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ranchland Wind Storage", "city": "", "id": "250", "external_id": "64545", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "146", "power_mw": "73", "customer": "", "owner": "Ranchland Wind Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lily Solar Hybrid", "city": "", "id": "251", "external_id": "63892", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Lily Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TREX US Red Holly", "city": "", "id": "252", "external_id": "63202", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "TREX US Red Holly LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "High Lonesome Wind Power, LLC Hybrid", "city": "", "id": "253", "external_id": "62562", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "High Lonesome Wind Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roadrunner, LLC Hybrid", "city": "", "id": "254", "external_id": "62561", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Roadrunner Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Darien Solar", "city": "", "id": "255", "external_id": "64534", "state": "wisconsin", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Wisconsin Electric Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Omburu", "city": "erongo region", "id": "256", "external_id": "", "state": "", "country": "namibia", "capacity_mwh": "72", "estimate_mwh": "", "power_mw": "58", "customer": "", "owner": "NamPower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-21.495675", "long": "16.026467", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/e20m-grant-funding-for-namibias-first-grid-scale-bess-from-germanys-national-development-bank/", "link2": "", "link3": "", "link4": ""}, {"name": "Buffalo", "city": "", "id": "257", "external_id": "", "state": "", "country": "netherlands", "capacity_mwh": "48", "estimate_mwh": "", "power_mw": "25", "customer": "", "owner": "GIGA Storage", "developer": "", "manufacturer": "Wartsila Energy", "type": "", "cells": "LFP", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.985216", "long": "5.665107", "coords_hint": "2", "use_case": "", "notes": "storage will be rented out to Eneco, STAAS: storage as a service", "project_website": "", "link1": "https://www.energy-storage.news/wartsilas-48mwh-netherlands-bess-will-be-europes-first-large-scale-lfp-battery-project/", "link2": "", "link3": "", "link4": ""}, {"name": "Dunkirk 2", "city": "Dunkirk", "id": "258", "external_id": "", "state": "", "country": "france", "capacity_mwh": "31", "estimate_mwh": "", "power_mw": "31", "customer": "", "owner": "Total", "developer": "", "manufacturer": "Saft", "type": "Intensium Max 20 High Energy (20ft container)", "cells": "NMC", "no_of_battery_units": "16", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.030471", "long": "2.255373", "coords_hint": "2", "use_case": "", "notes": "saft is owned by total", "project_website": "", "link1": "https://www.energy-storage.news/frances-largest-battery-storage-facility-expanded-to-61mw-61mwh-as-second-phase-completed/", "link2": "", "link3": "", "link4": ""}, {"name": "AES Kilroot Station Battery Storage Array", "city": "", "id": "259", "external_id": "6845", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "AES Kilroot Power (AES KPL)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2015-11-18", "start_operation": "2016-01-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pelham", "city": "", "id": "260", "external_id": "6898", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy/ InfraRed Capital", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-18", "start_construction": "2017-01-15", "start_operation": "2017-06-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackburn Meadows ", "city": "", "id": "261", "external_id": "6906", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "E.ON UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-04-07", "start_operation": "2017-10-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Broxburn ", "city": "", "id": "262", "external_id": "6910", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-03-06", "start_construction": "2017-08-15", "start_operation": "2018-09-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land to the west of Clay Hill Pit / Larport Farm", "city": "", "id": "263", "external_id": "6911", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Anesco (formerly owned by Energy Reservoirs)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-11-18", "start_construction": "2019-01-01", "start_operation": "2020-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roosecote", "city": "", "id": "264", "external_id": "6912", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Centrica", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-03-01", "start_operation": "2018-11-30", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hill Farm - Energy Barn", "city": "", "id": "265", "external_id": "6915", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-08-17", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kings Barn Farm - Energy Barn", "city": "", "id": "266", "external_id": "6916", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-04", "start_construction": "2016-12-15", "start_operation": "2017-03-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Leverton Farm - Energy Barn", "city": "", "id": "267", "external_id": "6917", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Eelpower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-11-01", "start_operation": "2018-01-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Noriker Power Staunch", "city": "", "id": "268", "external_id": "6918", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Hazel Capital/ Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-05-19", "start_construction": "2016-12-15", "start_operation": "2017-03-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Burton", "city": "", "id": "269", "external_id": "6920", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-09-30", "start_construction": "2018-01-25", "start_operation": "2018-06-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tynemouth Energy Storage System (TESS)", "city": "", "id": "270", "external_id": "6925", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Enel (formerly Element Power)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-12", "start_construction": "2018-12-20", "start_operation": "2018-05-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Nevendon", "city": "", "id": "271", "external_id": "6926", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Belectric UK / Foresight", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2018-10-15", "start_operation": "2018-03-15", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pen y Cymoedd Energy Storage", "city": "", "id": "272", "external_id": "6927", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Vattenfall", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-11-01", "start_operation": "2018-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chelveston Renewable Energy Park", "city": "", "id": "273", "external_id": "6941", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Federal Estates", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-06-15", "start_construction": "2019-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Claredown Farm", "city": "", "id": "274", "external_id": "6945", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Zenobe (formerly Energy Reservoir 15)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-06-05", "start_construction": "2017-09-01", "start_operation": "2018-02-27", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Breach Farm - Energy Barn", "city": "", "id": "275", "external_id": "6914", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Anesco/ Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norton", "city": "", "id": "276", "external_id": "6923", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy/ InfraRed Capital", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Traston Road", "city": "", "id": "277", "external_id": "6929", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bristol Road", "city": "", "id": "278", "external_id": "6930", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-10-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Asfordby Business Park (1)", "city": "", "id": "279", "external_id": "6932", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "23", "power_mw": "23", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lockleaze Energy Storage", "city": "", "id": "280", "external_id": "6961", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Aura Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-05-05", "start_construction": "2017-06-01", "start_operation": "2017-12-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tofts Lane", "city": "", "id": "281", "external_id": "6942", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Enstor Power UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Port of Tyne", "city": "", "id": "282", "external_id": "6976", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Foresight", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2018-04-01", "start_operation": "2018-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ray Battery Storage Facility", "city": "", "id": "283", "external_id": "6943", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Vattenfall Wind Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pikelaw Place", "city": "", "id": "284", "external_id": "6944", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Green Hedge Energy UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Hollies", "city": "", "id": "285", "external_id": "6946", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "24", "customer": "", "owner": "Spencer Farm Produce", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Minety North", "city": "", "id": "286", "external_id": "6952", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy / Minety North Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Melksham Substation East Storage", "city": "", "id": "287", "external_id": "6953", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy / Melksham East Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Slamseys Energy Storage", "city": "", "id": "288", "external_id": "7000", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Gridserve Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-10-26", "start_construction": "2020-01-13", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Melksham Substation West Storage", "city": "", "id": "289", "external_id": "6955", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy / Melksham West Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norwich Road Industrial Estate", "city": "", "id": "290", "external_id": "6958", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land off Queenborough Road", "city": "", "id": "291", "external_id": "7003", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-10-30", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wolverhampton West Sub Station", "city": "", "id": "292", "external_id": "6977", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Former Rugeley Power Station", "city": "", "id": "293", "external_id": "6981", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "ENGIE Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-08-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aikengall II Community Wind Farm Battery", "city": "", "id": "294", "external_id": "7015", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Community Wind Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rayleigh Transforming Station", "city": "", "id": "295", "external_id": "6984", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Aura Power / South East Grid Storage Two", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bilbo Solar Farm Energy Storage ", "city": "", "id": "296", "external_id": "7020", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Energy International", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-09-20", "start_construction": "2020-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stony Energy Storage Facility", "city": "", "id": "297", "external_id": "7001", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roaring Hill Energy Storage Facility", "city": "", "id": "298", "external_id": "7002", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pillswood Phase 1", "city": "Cottingham", "id": "299", "external_id": "7005", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": ""}, {"name": "Aven Industrial Estate", "city": "", "id": "300", "external_id": "7007", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Max Design Consultancy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Litchlake Farm", "city": "", "id": "301", "external_id": "7011", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hall Farm Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ravensroost Farm", "city": "", "id": "302", "external_id": "7014", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Arlington Energy (formerly Enso Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-10-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drax Re-Power", "city": "", "id": "303", "external_id": "7017", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Drax Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "STOR Field 9", "city": "", "id": "304", "external_id": "7018", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "37", "power_mw": "37", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Nether Moor Field", "city": "", "id": "305", "external_id": "7019", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Thurcroft Energy (Max Design Consultancy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norwich Substation Storage Facility", "city": "", "id": "306", "external_id": "7021", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mannington Battery Storage Plant", "city": "", "id": "307", "external_id": "7024", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Public Power Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Charleywood Road, Knowsley Industrial Park", "city": "", "id": "308", "external_id": "7026", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Immersa / Kirkby Battery Storage 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Enderby Storage, Redcomb Farm", "city": "", "id": "309", "external_id": "7044", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy / Enderby Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-20", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Middleton Clean Energy Plant", "city": "", "id": "310", "external_id": "7029", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Lancaster Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-01-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Portadown Road", "city": "", "id": "311", "external_id": "7047", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon Storage Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-09-21", "start_construction": "2020-01-15", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dungannon Energy Storage System", "city": "", "id": "312", "external_id": "7050", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon Storage Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-10-08", "start_construction": "2019-12-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Leighton Hall Farm", "city": "", "id": "313", "external_id": "7032", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Energy Demand and Response", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Manton Wood", "city": "", "id": "314", "external_id": "7035", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Lark Gas Assets", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Riverside Energy Park", "city": "", "id": "315", "external_id": "7036", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Cory Riverside Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Salt End Lane", "city": "", "id": "316", "external_id": "7039", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "AMPY Energy Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fraserburgh Development", "city": "", "id": "317", "external_id": "7041", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land To The East Of Wholeflats Road (Grangemouth)", "city": "", "id": "318", "external_id": "7043", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Enstor (formerly CJ Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-07-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tilbury Energy Centre", "city": "", "id": "319", "external_id": "7048", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "RWE Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ellbridge Lane", "city": "", "id": "320", "external_id": "7051", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-08-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elland Storage Project", "city": "", "id": "321", "external_id": "7053", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land at Derwenthaugh Eco Park", "city": "", "id": "322", "external_id": "7054", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Derwenthaugh", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Strichen South", "city": "", "id": "323", "external_id": "7056", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Perseverance Road", "city": "", "id": "325", "external_id": "7061", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cottam Power Station", "city": "", "id": "326", "external_id": "7066", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gloucestershire Science and Technology Park", "city": "", "id": "327", "external_id": "7067", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hadham Road", "city": "", "id": "328", "external_id": "7068", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kilshaw Street", "city": "", "id": "329", "external_id": "7072", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Riverford Farm", "city": "", "id": "330", "external_id": "7078", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Abham Storage / Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sundridge Hill", "city": "", "id": "331", "external_id": "7081", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Severn Road", "city": "", "id": "332", "external_id": "7085", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "FPC Industry & Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Callywhite Lane Commercial Estate", "city": "", "id": "333", "external_id": "7087", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land Adjacent to 4 Redcote Lane (Armley)", "city": "", "id": "334", "external_id": "7111", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Enstor (formerly CJ Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-06-07", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dollymans Storage", "city": "", "id": "335", "external_id": "7088", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Statera Energy / Dollymans Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grendon Storage", "city": "", "id": "336", "external_id": "7089", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy / Grendon Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maldon Hall", "city": "", "id": "337", "external_id": "7095", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Creyke Beck", "city": "", "id": "338", "external_id": "7122", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-06-15", "start_construction": "2018-03-01", "start_operation": "2018-11-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rubber and Allied Products", "city": "", "id": "339", "external_id": "7096", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stockbridge Road", "city": "", "id": "340", "external_id": "7097", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Winchester Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Huggin's Hall", "city": "", "id": "341", "external_id": "7129", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Low Carbon", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-10-21", "start_construction": "2017-08-13", "start_operation": "2018-02-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Kirkby Business Park", "city": "", "id": "342", "external_id": "7109", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Morris & co Handling", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fideoak Mills", "city": "", "id": "343", "external_id": "7152", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Kiwi Power (formerly Taunton Battery Storage)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-02-23", "start_construction": "2019-09-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penwortham Sub Station", "city": "", "id": "344", "external_id": "7119", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land at Carnegie Road", "city": "", "id": "345", "external_id": "7155", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "\ufffdrsted", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2016-12-15", "start_construction": "2018-10-24", "start_operation": "2018-12-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaufort Road", "city": "", "id": "346", "external_id": "7128", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "UK Power Reserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-11-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land North of Thornton Road", "city": "", "id": "347", "external_id": "7131", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "South Redhouse", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2016-02-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "North West Of Jameston Farm", "city": "", "id": "348", "external_id": "7133", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land SW of Shilton Cottage", "city": "", "id": "349", "external_id": "7134", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Muirhall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-10-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Calow Green Farm", "city": "", "id": "350", "external_id": "7140", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy (formerly Enso Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land Adj Harmer Warren Quarry", "city": "", "id": "351", "external_id": "7143", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "New Forest Energy (formerly Somerley Estate)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-02-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Resubmission", "city": "", "id": "352", "external_id": "7149", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Taunton Substation ", "city": "", "id": "353", "external_id": "7153", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cleator", "city": "", "id": "354", "external_id": "7177", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Low Carbon Storage Investment Company/ VLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2017-08-08", "start_operation": "2018-01-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greenburn Wind Park", "city": "", "id": "355", "external_id": "7159", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Energy Consents And Deployment Unit", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Braintree Road Substation", "city": "", "id": "356", "external_id": "7161", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-01-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drumfad Wood", "city": "", "id": "357", "external_id": "7165", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-12-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Osbaldwick Substation", "city": "", "id": "358", "external_id": "7172", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-02-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitelee Wind Farm Battery Storage Extension", "city": "", "id": "359", "external_id": "7174", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables (formerly Arcus Consultancy Services)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Old Green Farm, Alveston Battery Storage", "city": "", "id": "360", "external_id": "7182", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Leechpool Farm, Norrington Battery Storage", "city": "", "id": "361", "external_id": "7183", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-08-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Minety South Battery Storage", "city": "", "id": "362", "external_id": "7184", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Didsbury Battery Storage", "city": "", "id": "363", "external_id": "7185", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wentlooge Renewable Energy Hub", "city": "", "id": "364", "external_id": "7192", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "62", "power_mw": "62", "customer": "", "owner": "Wentlooge Farmers' Solar Scheme", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Classic Marble Showers Site", "city": "", "id": "365", "external_id": "7208", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "48", "customer": "", "owner": "Engie Developments Ireland", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pleasance Road", "city": "", "id": "366", "external_id": "7217", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Coronation Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackpark Farm ", "city": "", "id": "367", "external_id": "7226", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Shires Hamilton ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Land North of Actrees Solar Farm", "city": "", "id": "368", "external_id": "7230", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sundon Substation", "city": "", "id": "370", "external_id": "7283", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Boscar Grange Farm", "city": "", "id": "371", "external_id": "7332", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "27", "power_mw": "27", "customer": "", "owner": "Gridserve", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2018-11-29", "start_construction": "2019-05-23", "start_operation": "2019-12-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Jamesfield Organic Centre", "city": "Abernethy", "id": "373", "external_id": "7315", "state": "fife", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 130", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Troston Loch Wind Farm", "city": "", "id": "374", "external_id": "7333", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tollgate Farm Battery Storage (Resubmission)", "city": "", "id": "375", "external_id": "7335", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Snarlton Farm", "city": "", "id": "377", "external_id": "7380", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Plot 2B EurolinkV", "city": "", "id": "378", "external_id": "7383", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Trenport Investments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aurora Solar Farm", "city": "", "id": "379", "external_id": "7385", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "Low Carbon UK Solar Investment Company", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Harestanes Windfarm", "city": "", "id": "380", "external_id": "7395", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carnegie Road (Phase 2)", "city": "", "id": "381", "external_id": "7403", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Shawton Engineering", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trevol Business Park", "city": "", "id": "382", "external_id": "7404", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Londonwide Properties", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lascar Works ", "city": "", "id": "383", "external_id": "7464", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-03-26", "start_operation": "2019-06-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Douglas West Wind Farm (extension)", "city": "", "id": "384", "external_id": "7460", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Douglas West Extension / 3R Energy Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Harker Grid Sub Station", "city": "", "id": "385", "external_id": "7462", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-07-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bramford Substation", "city": "", "id": "386", "external_id": "7479", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brook Farm", "city": "", "id": "387", "external_id": "7498", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Low Carbon", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Salisbury Substation", "city": "Salisbury", "id": "388", "external_id": "7510", "state": "wiltshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49.5", "customer": "", "owner": "SSE", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "Harmony sold in 2021", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lackenby (Resubmission)", "city": "", "id": "389", "external_id": "7518", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greenfield Road", "city": "", "id": "390", "external_id": "7570", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Arlington Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-03-23", "start_construction": "2019-06-19", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cowley electricity sub-station", "city": "", "id": "391", "external_id": "7571", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-07-19", "start_construction": "2019-11-15", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lisnabreeny Road", "city": "", "id": "392", "external_id": "7556", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Energia Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hagshaw Hill", "city": "", "id": "393", "external_id": "7572", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-02-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shindour Feddal Hill Wood Braco", "city": "", "id": "394", "external_id": "7573", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Orchardbank Industrial Estate", "city": "", "id": "395", "external_id": "7574", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ardoch Farm", "city": "", "id": "396", "external_id": "7575", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bradford West Substation (Harrop Edge Farm Resubmission)", "city": "", "id": "397", "external_id": "7577", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dunsinane Industrial Estate", "city": "", "id": "398", "external_id": "7591", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Crown Farm", "city": "", "id": "399", "external_id": "7606", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gipsy Lane", "city": "", "id": "400", "external_id": "7632", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-03-20", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Model Farm", "city": "", "id": "401", "external_id": "7609", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Flower Farm", "city": "", "id": "402", "external_id": "7614", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Energy Centre Royal Mint", "city": "", "id": "403", "external_id": "7684", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Infinite Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-12-09", "start_construction": "2021-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holes Bay", "city": "Poole", "id": "404", "external_id": "7688", "state": "dorset", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-01-14", "start_construction": "2020-01-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.726395", "long": "-1.9901", "coords_hint": "1", "use_case": "", "notes": "Duplicate of 17", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Feeder Road", "city": "", "id": "405", "external_id": "7663", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Thrive Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Ballochy", "city": "", "id": "406", "external_id": "7675", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thurrock Flexible Generation Plant", "city": "", "id": "407", "external_id": "7696", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "RPS Group / Thurrock Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lister Drive", "city": "", "id": "408", "external_id": "7740", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Arenko Cleantech", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-03-13", "start_construction": "2021-05-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Churchtown Solar Farm Battery Storage", "city": "", "id": "409", "external_id": "7726", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rye Common", "city": "Farnham", "id": "410", "external_id": "7737", "state": "hampshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.25011", "long": "-0.87423", "coords_hint": "1", "use_case": "", "notes": "Phase II is 200m north-east of Phase I", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?keyVal=R56JLBHZGS400&activeTab=summary", "link4": "https://publicaccess.hart.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RJ0K4PHZ0GB00"}, {"name": "Basing Road", "city": "", "id": "411", "external_id": "7746", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Eco-Economix", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stonehill Energy Storage", "city": "", "id": "412", "external_id": "7773", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-02-24", "start_construction": "2021-06-09", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordtown Energy Storage (Resubmission)", "city": "", "id": "413", "external_id": "7764", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Intelligent Land Investments (ILI)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Liverpool Energy Management Facility", "city": "", "id": "414", "external_id": "7772", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statkraft UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newton Wood Farm", "city": "", "id": "415", "external_id": "7780", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hawthorne Road", "city": "", "id": "416", "external_id": "7800", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Shaw Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clauchrie Windfarm Battery", "city": "", "id": "417", "external_id": "7804", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Manor Farm", "city": "", "id": "418", "external_id": "7820", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "26", "customer": "", "owner": "Coriolis Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-06-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mauxhall Farm", "city": "", "id": "419", "external_id": "7827", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "24", "customer": "", "owner": "ENGIE Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Titchfield Lane", "city": "", "id": "420", "external_id": "7828", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Balanced Grid Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cleve Hill Solar Project", "city": "", "id": "421", "external_id": "7856", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Cleve Hill Solar (Hive Energy/ Wirsol Energy)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arecleoch Wind Farm (extension)", "city": "", "id": "422", "external_id": "7882", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coventry National Grid Substation", "city": "", "id": "423", "external_id": "7885", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dundee Technology Park", "city": "", "id": "424", "external_id": "7946", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2020-10-09", "start_construction": "", "start_operation": "2021-06-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Reach Road", "city": "", "id": "425", "external_id": "7906", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Power Networks", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bustleholme Substation", "city": "", "id": "426", "external_id": "7907", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Minety Substation", "city": "", "id": "427", "external_id": "7942", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Project", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Unit 5 XL Business Park", "city": "", "id": "428", "external_id": "7985", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Amber Infrastructure Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-18", "start_construction": "2021-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Perserverance Road (Resubmission)", "city": "", "id": "429", "external_id": "7966", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Learielaw Farm", "city": "", "id": "430", "external_id": "7970", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Intelligent Land Investments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Park Farm", "city": "", "id": "431", "external_id": "7983", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Eco-Economix", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-05-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mucklow Hill", "city": "", "id": "432", "external_id": "7984", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Volta Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Britannia House", "city": "", "id": "433", "external_id": "7986", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Peel Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitehouse Farm Energy Barn", "city": "", "id": "434", "external_id": "7987", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Hedge", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Catsbrain Farm", "city": "", "id": "435", "external_id": "7988", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Hedge", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roaring Hill (Resubmission)", "city": "", "id": "436", "external_id": "7989", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mill Hill National Grid Substation", "city": "", "id": "437", "external_id": "8009", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grid Minety Substation", "city": "", "id": "438", "external_id": "8021", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Colinglen Road Battery", "city": "", "id": "439", "external_id": "8033", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Hannahstown BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grid Axminster Substation", "city": "", "id": "440", "external_id": "8036", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grid Enderby Substation", "city": "", "id": "441", "external_id": "8037", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harbour Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Moston Vale", "city": "", "id": "442", "external_id": "8085", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Novus Renewable Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2020-11-24", "start_construction": "2021-07-31", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Welkin Mill", "city": "", "id": "443", "external_id": "8055", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Loudwater Battery Storage Site", "city": "", "id": "444", "external_id": "8142", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-05-24", "start_construction": "2021-06-10", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Torrdhuin, Auchteraw Battery Storage Facility", "city": "", "id": "445", "external_id": "8096", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SHB Hire Ltd", "city": "", "id": "446", "external_id": "8099", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Gerard Hall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-05-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bloxwich Battery", "city": "", "id": "447", "external_id": "8160", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "41", "power_mw": "41", "customer": "", "owner": "Gresham House Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "2019-04-01", "start_operation": "2019-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackpark Energy Storage (Resubmission)", "city": "", "id": "448", "external_id": "8105", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Shires Hamilton", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drumcross Battery Storage", "city": "", "id": "449", "external_id": "8155", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Muirhall Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-06-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Richborough Energy Park", "city": "", "id": "450", "external_id": "8195", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Richborough Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lower Dunton Road Battery Storage Facility", "city": "", "id": "451", "external_id": "8213", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Cedar Tech Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Three Bridges Solar Farm", "city": "", "id": "452", "external_id": "8220", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Platchaig House, Kilmorack - Battery Storage Facility", "city": "", "id": "453", "external_id": "8248", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brentwood nergy Storage System", "city": "", "id": "454", "external_id": "8249", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newlands Farm Battery Storage Facility Phase 2", "city": "", "id": "455", "external_id": "8264", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lakeside Energy Storage Facility", "city": "", "id": "456", "external_id": "8268", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Renewable Energy System Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Guildford Road Battery Storage Facility", "city": "", "id": "457", "external_id": "8269", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gerrards Cross Sewage Treatment Works", "city": "", "id": "458", "external_id": "8271", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Peak Gen Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cottom Power Station", "city": "", "id": "459", "external_id": "8278", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Thermal Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Capenhurst Lane", "city": "", "id": "460", "external_id": "8283", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Native River Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Park Farm, Herongate Solar Photovoltaic PV Farm", "city": "", "id": "461", "external_id": "8358", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Old Gallows Road - Battery storage", "city": "", "id": "462", "external_id": "8368", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Farburn Place - Energy Storage Facility", "city": "", "id": "463", "external_id": "8385", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Peak Reserve Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane Battery Storage", "city": "", "id": "464", "external_id": "8430", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Walker & Son (Hauliers) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Minchens Lane Battery Storage Facility", "city": "", "id": "465", "external_id": "8434", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grids Rainhill Substation Battery storage facility", "city": "", "id": "466", "external_id": "8439", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Sizing John Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trondheim Way Battery energy storage", "city": "", "id": "467", "external_id": "8455", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Burns Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Doverdale - Solar Farm & Battery Storage", "city": "", "id": "468", "external_id": "8529", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bristol Avenue - Battery Energy Storage Facility", "city": "", "id": "469", "external_id": "8809", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Henco International Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Howick Hall Farm - Battery Storage Facility", "city": "", "id": "470", "external_id": "8829", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Penwortham Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holt Road - Battery Energy Storage System", "city": "", "id": "471", "external_id": "8833", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Mannington Energy Centre Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bolfornought Farm Battery Storage Facility", "city": "", "id": "472", "external_id": "8912", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Skelton Battery Storage Facility", "city": "", "id": "473", "external_id": "8914", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Skelton Peak Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitehills Energy Storage Facility", "city": "", "id": "474", "external_id": "8916", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dersalloch Battery Storage Facility", "city": "", "id": "475", "external_id": "8927", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables (UK) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bolney Substation - Battery Storage", "city": "", "id": "476", "external_id": "8986", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stor Generation Plant - Battery Storage", "city": "", "id": "477", "external_id": "8998", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hull East Stor Generation Compound - Battery energy storage", "city": "", "id": "478", "external_id": "9006", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kilgallioch - Battery energy storage", "city": "", "id": "479", "external_id": "9007", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Scottish Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Standby Embedded Stor Power Plant - Battery storage", "city": "", "id": "480", "external_id": "9010", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greens Farm - Battery energy storage", "city": "", "id": "481", "external_id": "9012", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelham Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maiden, Annfield Plain - Energy Storage", "city": "", "id": "482", "external_id": "9036", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "38", "power_mw": "38", "customer": "", "owner": "Stephenson Mohl Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barton Hill Industrial Park - Battery Energy Storage Facility", "city": "", "id": "483", "external_id": "9046", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Power Initiatives Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bronwylfa Road, Talwrn - Battery Storage Facility", "city": "", "id": "484", "external_id": "9052", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whaddon Lane, Hilperton", "city": "", "id": "485", "external_id": "9057", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "18", "power_mw": "18", "customer": "", "owner": "INRG", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Purlieus Farm, Minety - Battery Storage Facility", "city": "", "id": "486", "external_id": "9063", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Minety South 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dragonhall Farm, Padanaram - Battery Storage", "city": "", "id": "487", "external_id": "9066", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecosse Solar Parks Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "488", "external_id": "9115", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "SSE Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rusholme Grange Resubmission", "city": "Selby", "id": "489", "external_id": "9121", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "70", "estimate_mwh": "", "power_mw": "35", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "2023Q3", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.73122", "long": "-0.94159", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://public.selby.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QT1W2CNXJ6D00", "link3": "", "link4": ""}, {"name": "Daer Wind Farm", "city": "", "id": "490", "external_id": "9127", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "E.ON Climate & Renewables UK Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bay Gateway - Battery Storage Facility", "city": "", "id": "491", "external_id": "9199", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Balsillie Avenue - Roaring Hill Energy Storage Facility", "city": "", "id": "492", "external_id": "9224", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Forest Gate - Solar Farm & Battery Storage", "city": "", "id": "493", "external_id": "9230", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Leigh Delamere - Solar farm & Battery storage", "city": "", "id": "494", "external_id": "9238", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Fambridge Hall - Solar farm & Battery storage", "city": "", "id": "495", "external_id": "9274", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Weirs Drove, Burwell - Battery Storage Facility", "city": "", "id": "496", "external_id": "9292", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Fen Power 1 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sundon Substation - 49.9MW Battery Storage", "city": "", "id": "497", "external_id": "9315", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Widow Hill, Balderstone Lane - Battery Energy Storage System", "city": "", "id": "498", "external_id": "9340", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "P3P Partners LLP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grendon Lakes - Battery Storage", "city": "", "id": "499", "external_id": "9341", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maelor Gasworks - Solar Farm & Battery Storage", "city": "", "id": "500", "external_id": "9343", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage", "city": "", "id": "501", "external_id": "9346", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Namene Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Farm Solar Park", "city": "", "id": "502", "external_id": "9361", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Voltalia UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2019-11-15", "start_construction": "2021-01-07", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Capenhurst Lane, Capenhurst - Battery storage", "city": "", "id": "503", "external_id": "9377", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "HD888CAP Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stainland Road, Salterhebble - Battery Storage Facility", "city": "", "id": "504", "external_id": "9397", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "North Deane Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dunton Hall - Battery Energy Storage System", "city": "", "id": "505", "external_id": "9427", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "Welbar Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Admiralty Road - Battery Energy Storage Facility", "city": "", "id": "506", "external_id": "9470", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "BAT-NR30 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-08-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "507", "external_id": "9475", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "SSE Enterprise", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Caldwell Road - Battery Storage", "city": "", "id": "508", "external_id": "9507", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Aura Power BESS Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wishaw 49.9 Battery Storage Facility", "city": "", "id": "509", "external_id": "9522", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Spectrum Reserve Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-09-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Heysham Energy Storage Project", "city": "", "id": "510", "external_id": "9545", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Kona Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tiddlywink Barn Battery Storage Power Plant", "city": "", "id": "511", "external_id": "9552", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Mcballester Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Davies Road - Battery Storage", "city": "", "id": "512", "external_id": "9563", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Middlewich Road - Solar Photovoltaics & Battery Storage", "city": "", "id": "513", "external_id": "9565", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Cheshire East Council", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Astra Centre, Royal Barn Road - Energy Storage", "city": "", "id": "514", "external_id": "9584", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Arlington Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Winterton Road - Battery Energy Storage", "city": "", "id": "515", "external_id": "9608", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "95", "power_mw": "95", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Richborough Energy Park - Phase 2", "city": "", "id": "516", "external_id": "9626", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "71", "power_mw": "71", "customer": "", "owner": "Richborough Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-04-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bredbury Substation - Battery Storage Facility", "city": "", "id": "517", "external_id": "9653", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Brickmakers Arms Battery", "city": "", "id": "518", "external_id": "9668", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "FPC Industry & Enterprise 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Third Energy UK Gas Limited - Battery Energy Storage", "city": "", "id": "519", "external_id": "9691", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Third Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)", "city": "", "id": "520", "external_id": "9708", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "British Solar Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton Lane, Nursling - Battery Storage Facility", "city": "", "id": "521", "external_id": "9760", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cholmondeley Road - Battery Storage", "city": "", "id": "522", "external_id": "9763", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Riverside Estates (NW) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Slough Road - Battery Storage", "city": "", "id": "523", "external_id": "9774", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hybridspeicher AU", "city": "", "id": "524", "external_id": "SEE900291433160", "state": "bavaria", "country": "germany", "capacity_mwh": "8", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-07-31", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Big Battery Lausitz", "city": "", "id": "526", "external_id": "SEE905930139120", "state": "brandenburg", "country": "germany", "capacity_mwh": "52", "estimate_mwh": "", "power_mw": "66", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-11-19", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS 2 KW Bexbach", "city": "", "id": "527", "external_id": "SEE908096553144", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batteriespeicher Chemnitz GmbH \uff06 Co. KG", "city": "", "id": "528", "external_id": "SEE910324388312", "state": "saxony", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-04-24", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hybridregelkraftwerk", "city": "", "id": "529", "external_id": "SEE913862454280", "state": "bremen", "country": "germany", "capacity_mwh": "14", "estimate_mwh": "", "power_mw": "18", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-11", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Fenne", "city": "", "id": "530", "external_id": "SEE919443669678", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-10-09", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMAREG 1", "city": "", "id": "531", "external_id": "SEE931375347240", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2020-02-06", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batteriespeicherkraftwerk", "city": "", "id": "532", "external_id": "SEE933095868289", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-05-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Energiewende-Speicher", "city": "", "id": "533", "external_id": "SEE935506652999", "state": "lower saxony", "country": "germany", "capacity_mwh": "26", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-08-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "WBS-Tarzow", "city": "", "id": "534", "external_id": "SEE937857006797", "state": "mecklenburg-vorpommern", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-25", "start_construction": "", "start_operation": "", "start_estimated": "2022-02-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "70000000", "city": "", "id": "535", "external_id": "SEE940316838242", "state": "bavaria", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "12", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-03-20", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Weiher", "city": "", "id": "536", "external_id": "SEE941708872783", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Im Buckeberg 62 Stromspeicher", "city": "", "id": "537", "external_id": "SEE946919525862", "state": "baden-wuerttemberg", "country": "germany", "capacity_mwh": "13", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "2021-12-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BES BEN", "city": "", "id": "539", "external_id": "SEE963081865633", "state": "saxony", "country": "germany", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2018-11-14", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Walsum", "city": "", "id": "540", "external_id": "SEE964940893804", "state": "nrw", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-30", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Q_ESS_Elverlingsen", "city": "", "id": "541", "external_id": "SEE966091400436", "state": "nrw", "country": "germany", "capacity_mwh": "18", "estimate_mwh": "", "power_mw": "17", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2017-07-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Herne", "city": "", "id": "542", "external_id": "SEE971138728251", "state": "nrw", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-08-28", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BES GRO", "city": "", "id": "544", "external_id": "SEE976362409624", "state": "saxony", "country": "germany", "capacity_mwh": "25", "estimate_mwh": "", "power_mw": "16", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2019-07-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "RRKW Feldheim", "city": "", "id": "545", "external_id": "SEE976927444749", "state": "brandenburg", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-07-26", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "B\u00fcttel Speicher", "city": "", "id": "546", "external_id": "SEE984446277410", "state": "schleswig-holstein", "country": "germany", "capacity_mwh": "4", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-08-26", "start_construction": "", "start_operation": "", "start_estimated": "2022-08-31", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GBS KW Bexbach", "city": "", "id": "547", "external_id": "SEE990521990150", "state": "saarland", "country": "germany", "capacity_mwh": "15", "estimate_mwh": "", "power_mw": "15", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2016-09-25", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blythe Mesa Solar II", "city": "", "id": "548", "external_id": "65053", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Blythe Mesa Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chaparral Springs", "city": "", "id": "549", "external_id": "64864", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BigBeau Solar, LLC", "city": "", "id": "550", "external_id": "64993", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Big Beau Solar, LLC ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scarlet Solar (CA)", "city": "", "id": "551", "external_id": "64908", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "EDP Renewables North America LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Santa Ana Storage 2", "city": "", "id": "552", "external_id": "64921", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rabbitbrush Solar, LLC", "city": "", "id": "553", "external_id": "64630", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn S1", "city": "", "id": "554", "external_id": "64929", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lake Placid Solar Power Plant", "city": "", "id": "555", "external_id": "62541", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Duke Energy Florida, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2021-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mossy Branch Battery Facility", "city": "", "id": "556", "external_id": "65018", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "65", "customer": "", "owner": "Georgia Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Waiawa Solar Power Hybrid", "city": "", "id": "557", "external_id": "65058", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Waiawa Solar Power LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaver Creek I", "city": "", "id": "558", "external_id": "65019", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Beaver Creek Wind I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaver Creek IV", "city": "", "id": "559", "external_id": "65023", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Beaver Creek Wind IV, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaver Creek II", "city": "", "id": "560", "external_id": "65020", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Beaver Creek Wind II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaver Creek III", "city": "", "id": "561", "external_id": "65021", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Beaver Creek Wind III, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Ripley Solar", "city": "", "id": "562", "external_id": "64911", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "ConnectGen Chautauqua County LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cameron Wind 1 LLC", "city": "", "id": "563", "external_id": "59118", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "24", "customer": "", "owner": "Cameron Wind 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dulles Solar and Storage", "city": "", "id": "564", "external_id": "65043", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Dominion Energy Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dry Bridge Storage", "city": "", "id": "565", "external_id": "65044", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Dominion Energy Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batterie Breitenworbis", "city": "", "id": "566", "external_id": "SEE977720016904", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2021-12-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Goyder", "city": "Burra", "id": "567", "external_id": "", "state": "south australia", "country": "australia", "capacity_mwh": "", "estimate_mwh": "1800", "power_mw": "900", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-15", "start_construction": "2022-01-17", "start_operation": "", "start_estimated": "2024", "cost_million": "3000", "cost_currency": "AUD", "cost_incl_solar": "1", "lat": "-33.649566", "long": "139.000287", "coords_hint": "-1", "use_case": "1200MW wind farm support ** 600MW solar support", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/neoen-begins-goyder-renewables-zone-wind-solar-storage-hybrid-project-in-south-australia/", "link2": "", "link3": "", "link4": ""}, {"name": "Great Western Battery", "city": "Wallerawang", "id": "568", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "500", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-18", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.397397", "long": "150.067853", "coords_hint": "1", "use_case": "coal plant replacement", "notes": "exact location from scoping report pdf", "project_website": "https://greatwesternbattery.com.au", "link1": "https://www.energy-storage.news/great-western-battery-1000mwh-project-proposed-to-aid-reliability-in-australias-post-coal-age/", "link2": "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "link3": "https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-12346552%2120201223T043129.182%20GMT", "link4": ""}, {"name": "Wallerawang 9", "city": "Wallerawang", "id": "569", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "500", "customer": "", "owner": "greenspot", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "2023", "cost_million": "400", "cost_currency": "USD", "cost_incl_solar": "0", "lat": "-33.407503", "long": "150.091529", "coords_hint": "1", "use_case": "coal plant replacement", "notes": "exact location from the pdf in sources", "project_website": "https://www.greenspot.com.au/news/wallerawang-9-battery-project-scoping-report/", "link1": "https://www.pv-magazine.com/2021/12/17/greenspot-plans-500-mw-1000-mwh-battery-at-former-coal-fired-power-plant-in-australia/", "link2": "https://www.greenspot.com.au/news/uploads/wallerawang-9-battery-project-scoping-report.pdf", "link3": "", "link4": ""}, {"name": "Crimson", "city": "", "id": "570", "external_id": "65140", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "RE Crimson LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Willow Spring Solar 3, LLC", "city": "", "id": "571", "external_id": "60325", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "72", "power_mw": "36", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn S3", "city": "", "id": "572", "external_id": "64928", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "35", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "ENGIE Solidago Solar Project - Hybrid", "city": "", "id": "573", "external_id": "65304", "state": "delaware", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "ENGIE Solidago Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mililani South Solar Farm", "city": "", "id": "574", "external_id": "57242", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "78", "power_mw": "39", "customer": "", "owner": "Mililani I Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "OE_MS6", "city": "", "id": "575", "external_id": "65291", "state": "mississippi", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "OE_MS6", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arida Solar (Hybrid)", "city": "", "id": "576", "external_id": "63841", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "326FW 8me LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Boulder Solar III LLC", "city": "", "id": "577", "external_id": "65141", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "116", "power_mw": "58", "customer": "", "owner": "174 Power Global Corp.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Noble Solar", "city": "", "id": "578", "external_id": "65271", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "BT Noble Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Byrd Ranch Storage", "city": "", "id": "579", "external_id": "65259", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Byrd Ranch Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Deer Wood Storage, LLC", "city": "", "id": "580", "external_id": "65145", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Deer Wood Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bumpers Solar Farm ", "city": "", "id": "581", "external_id": "6913", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2021-12-01", "start_construction": "", "start_operation": "2020-03-16", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stranoch 2", "city": "", "id": "582", "external_id": "7306", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage", "city": "", "id": "583", "external_id": "8342", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Scottish Power Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rush Green Motors - Battery storage", "city": "", "id": "584", "external_id": "8987", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "North Tawton Primary Substation - Battery Storage", "city": "", "id": "585", "external_id": "9275", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newcastle International Airport Phase 2 - Battery Storage", "city": "", "id": "586", "external_id": "9756", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Newcastle International Airport", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scawby Brook, Brigg - Battery Storage", "city": "", "id": "587", "external_id": "9848", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Centrica Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Braidfield Road, Hardgate - Battery Storage Facility", "city": "", "id": "588", "external_id": "9869", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group Plc ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ipswich Road, Cardiff - Battery Storage ", "city": "", "id": "589", "external_id": "9910", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Douglas West Wind Farm (extension)", "city": "", "id": "590", "external_id": "9957", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Greencoat UK Wind PLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pound Farm Lane - Battery Storage", "city": "", "id": "591", "external_id": "9969", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barlow Road, Barlow - Battery Storage", "city": "", "id": "592", "external_id": "9970", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Northington Lane - Battery Storage Facility", "city": "", "id": "593", "external_id": "9992", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sundon Sub Station Battery Storage Facility", "city": "", "id": "594", "external_id": "9998", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Clearstone Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mount Road, Castle Gresley - Battery Storage Facility", "city": "", "id": "595", "external_id": "10012", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Flexion Energy UK Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cellarhead - Battery Site", "city": "", "id": "596", "external_id": "10013", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "C&S Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Battery Storage Energy", "city": "", "id": "597", "external_id": "10022", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "SSE Enterprise Contracting", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Electricity Sub Station, Strichen - Battery Storage Facility", "city": "", "id": "598", "external_id": "10039", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Caton Road, Lancaster - Battery Storage Facility", "city": "", "id": "599", "external_id": "10047", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Energi Generation 12 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "St Dennis - Battery Energy Storage", "city": "", "id": "600", "external_id": "10058", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Renewable Connections Ltd / Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Park Road Battery Storage", "city": "", "id": "601", "external_id": "10076", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Arlington Energy Limited Avery Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greystones Road, Grangetown - Battery Energy Storage System", "city": "", "id": "602", "external_id": "10081", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "360", "power_mw": "360", "customer": "", "owner": "Sembcorp Utilities UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penn Croft Farm, Crondall - Battery Energy Storage Facility", "city": "", "id": "603", "external_id": "10163", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Fleet BESS Limited & SSE Energy Solutions Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Marsh Road - Battery Energy Storage System", "city": "", "id": "604", "external_id": "10173", "state": "east midlands", "country": "uk", "capacity_mwh": "1100", "estimate_mwh": "", "power_mw": "550", "customer": "", "owner": "Spalding Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-28", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.great.gov.uk/international/content/investment/opportunities/spalding-battery-energy-storage-system-in-lincolnshire/", "link2": "", "link3": "", "link4": ""}, {"name": "The Transmitting Station, Williton - Battery Storage", "city": "", "id": "605", "external_id": "10186", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Elgin Energy ES Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "A981 Fraserburgh - Battery Energy Storage", "city": "", "id": "606", "external_id": "10222", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Fraserburgh Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upper Geiselittle - Energy Storage Facility", "city": "", "id": "607", "external_id": "10225", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hillcrest Cottage, Shebster - Battery Energy Storage System", "city": "", "id": "608", "external_id": "10226", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elland Storage Project", "city": "", "id": "609", "external_id": "10236", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lethen Wind Farm Wind Turbines and Energy Storage", "city": "", "id": "610", "external_id": "10237", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Fred Olsen Renewables Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordtown Energy Storage (Resubmission)", "city": "", "id": "611", "external_id": "10239", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments (ILI)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hollandmey Renewable Energy Development", "city": "", "id": "612", "external_id": "10246", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Scottishpower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Doverdale - Solar Farm & Battery Storage", "city": "", "id": "613", "external_id": "10273", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Patch Elm Lane - Battery Storage ", "city": "", "id": "614", "external_id": "10282", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cheshire Power Station - Battery Storage Facility", "city": "", "id": "615", "external_id": "10295", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "RWE Generation UK Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ardleigh Road, Little Bromley - Battery Energy Storage", "city": "", "id": "616", "external_id": "10302", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Lawford Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stoke Lane - Battery Energy Storage", "city": "", "id": "618", "external_id": "10390", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "FPC Electric Land Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Speyslaw Farm - Battery Storage", "city": "", "id": "619", "external_id": "10394", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Elgin Energy EsCo", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hummingbird Energy Storage LLC", "city": "", "id": "620", "external_id": "65395", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Hummingbird Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Santa Paula Energy Storage LLC", "city": "", "id": "621", "external_id": "65397", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Santa Paula Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Black Walnut Energy Storage LLC", "city": "", "id": "622", "external_id": "65396", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Black Walnut Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Homestead Energy Storage LLC", "city": "", "id": "623", "external_id": "65398", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "14", "customer": "", "owner": "Homestead Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hot Pot Solar", "city": "", "id": "624", "external_id": "65419", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "560", "power_mw": "280", "customer": "", "owner": "Nevada Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Iron Point Solar (Hybrid)", "city": "", "id": "625", "external_id": "65377", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Nevada Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wolf Pit Branch Solar, LLC", "city": "", "id": "626", "external_id": "65437", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Wolf Pit Branch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cunningham Storage", "city": "", "id": "627", "external_id": "65410", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "380", "power_mw": "190", "customer": "", "owner": "BT Cunningham Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Noria Hondo Solar (Hybrid)", "city": "", "id": "628", "external_id": "65344", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Noria Hondo Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Roseland Solar Project, LLC", "city": "", "id": "629", "external_id": "65028", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "118", "power_mw": "59", "customer": "", "owner": "Enel Green Power Roseland Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Midmill, Kintore - Battery Energy Storage", "city": "", "id": "630", "external_id": "10701", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rusholme Grange", "city": "", "id": "631", "external_id": "7093", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Hedge Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vicarage Drove - Solar farm & Battery storage", "city": "", "id": "632", "external_id": "8518", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Connections Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Moggerhanger Road, Sandy - Solar Farm", "city": "", "id": "633", "external_id": "10981", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Kach Capital Estates Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Battlesbridge Bypass, Rettendon - Battery Storage", "city": "", "id": "634", "external_id": "9801", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Former EON Power Station, Booth Lane - Battery Energy Storage System", "city": "", "id": "635", "external_id": "10436", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Bluefield Sandbach Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vause Farm - Battery Storage", "city": "", "id": "636", "external_id": "10989", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Sirius Renewable Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Thinford Lane, Thinford - Energy Storage", "city": "", "id": "637", "external_id": "10489", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Renewable Energy Systems Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Field House Solar Farm", "city": "", "id": "638", "external_id": "10970", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Albanwise Synergy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ferrymuir", "city": "", "id": "639", "external_id": "7371", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gore Street Energy Storage Fund", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-11-21", "start_construction": "1905-07-14", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Strathruddie, Kinglassie - Solar farm", "city": "", "id": "640", "external_id": "10828", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Renewable Connection Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Broomloan Road - Battery Energy Storage", "city": "", "id": "641", "external_id": "10886", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Lifetime Property Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Waterswallows Road, Green Fairfield - Battery Storage Equipment", "city": "", "id": "642", "external_id": "10716", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "R & S Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Model Farm", "city": "", "id": "643", "external_id": "10687", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Tribus Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walpole St Andrew - Battery storage ", "city": "", "id": "644", "external_id": "10876", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Alfred Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Netherlands Way - Battery Energy Facility", "city": "", "id": "645", "external_id": "10429", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Volta Energy Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "St Ippolyts - Solar Farm & Battery Storage", "city": "", "id": "646", "external_id": "9695", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brown Edge - Battery Storage", "city": "", "id": "647", "external_id": "10431", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Broadgate, Chadderton - Battery Storage Containers", "city": "", "id": "648", "external_id": "10690", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pleasance Road - Battery Energy Facility", "city": "", "id": "649", "external_id": "9997", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coronation Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Binn Eco Park Wind Farm Energy Storage Facility", "city": "", "id": "650", "external_id": "9098", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Green Cat Renewables Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Jamesfield Organic Centre, Phase 1", "city": "Abernethy", "id": "651", "external_id": "10456", "state": "fife", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "56.342815", "long": "-3.2915692", "coords_hint": "1", "use_case": "", "notes": "Possible duplicate of 130", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Plymouth Stor Generation - Battery storage", "city": "", "id": "652", "external_id": "10432", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackhillock Electricity Substation - Battery Energy Storage System", "city": "", "id": "653", "external_id": "9723", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Zenobe Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hunterston Grid Services Complex - Energy Storage Facility", "city": "", "id": "654", "external_id": "10535", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Amp Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kincardine Grid Services Complex - Energy Storage Facility", "city": "", "id": "655", "external_id": "10536", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Amp Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carrick Windfarm", "city": "", "id": "656", "external_id": "10540", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": " Frodo Solar and Battery Energy Development", "city": "", "id": "657", "external_id": "10994", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Energy International", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clachaig Glen", "city": "", "id": "658", "external_id": "10996", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "RWE UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chleansaid Onshore Wind Farm", "city": "", "id": "659", "external_id": "10997", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ESB", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Halewick Lane, Sompting - Battery-based Energy Storage Facility", "city": "", "id": "660", "external_id": "7168", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Public Power Solutions (PPS) / West Sussex County Council", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dalmarnock Road - Battery Storage", "city": "", "id": "661", "external_id": "8507", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Colton - Solar photovoltaic farm, Battery storage", "city": "", "id": "662", "external_id": "10945", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Burcot Solar Farm", "city": "", "id": "663", "external_id": "9374", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Burcot Solar Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penstone Lane, Penn 1 - Battery Storage Facility", "city": "", "id": "664", "external_id": "10705", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penstone Lane, Lower Penn 2 - Battery Storage", "city": "", "id": "665", "external_id": "10733", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage", "city": "", "id": "666", "external_id": "10978", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hook Street - Energy Storage Compound", "city": "", "id": "667", "external_id": "10142", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Immersa", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shindour - Energy Storage Facility", "city": "", "id": "668", "external_id": "8464", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Gigabox Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton Lane, Nursling - Battery Storage Facility", "city": "", "id": "669", "external_id": "9673", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Claydon Farm - Solar Farm & Battery Storage", "city": "", "id": "670", "external_id": "8039", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects 17 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Croftmore - Battery Energy Storage ", "city": "", "id": "671", "external_id": "10700", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Crow Solar Park", "city": "", "id": "672", "external_id": "7175", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "INRG Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane", "city": "", "id": "673", "external_id": "7148", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Walker & Son (Hauliers) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-10-06", "start_construction": "2018-03-01", "start_operation": "2018-05-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lanegreat Barr, Great Barr - Battery Storage Facility", "city": "", "id": "674", "external_id": "10438", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grendon Lakes, Grendon - Battery Storage Facility", "city": "", "id": "675", "external_id": "10955", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drumshoreland Road Battery Storage Facility", "city": "", "id": "676", "external_id": "8920", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Sirius Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dog Trap Lane, Minety - Battery Energy Storage Systems", "city": "", "id": "677", "external_id": "10488", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "HB222BRI Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batterie Eisenach", "city": "", "id": "678", "external_id": "SEE982806373970", "state": "thuringia", "country": "germany", "capacity_mwh": "10", "estimate_mwh": "", "power_mw": "10", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Anode (Springville) BESS", "city": "", "id": "679", "external_id": "65458", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Separator (Etiwanda) BESS", "city": "", "id": "680", "external_id": "65456", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "224", "power_mw": "112", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-08", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cathode (Hinson) BESS", "city": "", "id": "681", "external_id": "65457", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Southern California Edison Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beartooth Energy Storage LLC", "city": "", "id": "682", "external_id": "65407", "state": "montana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Beartooth Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lone Star Solar", "city": "", "id": "683", "external_id": "62235", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "132", "power_mw": "66", "customer": "", "owner": "Lone Star Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ridgely Energy Farm", "city": "", "id": "684", "external_id": "65445", "state": "tennessee", "country": "usa", "capacity_mwh": "", "estimate_mwh": "138", "power_mw": "69", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dickens", "city": "", "id": "685", "external_id": "65489", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hydra", "city": "", "id": "686", "external_id": "65490", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paleo", "city": "", "id": "687", "external_id": "65491", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pavo", "city": "", "id": "688", "external_id": "65492", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "175", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tortolas", "city": "", "id": "689", "external_id": "65493", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Danville BESS 1", "city": "", "id": "690", "external_id": "65499", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Doc Brown LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kogan Creek / Chinchilla", "city": "", "id": "691", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "CS Energy", "owner": "", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "80", "status": "operation", "date_first_heard": "2022-03-30", "start_construction": "", "start_operation": "2024-03-05", "start_estimated": "2023Q4", "cost_million": "150", "cost_currency": "AUD", "cost_incl_solar": "", "lat": "-26.917756", "long": "150.746113", "coords_hint": "2", "use_case": "", "notes": "used day of tweet as operation start date", "project_website": "", "link1": "https://www.energy-storage.news/queensland-government-invests-in-200mwh-tesla-megapack-bess-at-coal-power-plant-site/", "link2": "https://twitter.com/Tesla_Megapack/status/1703911766596751682", "link3": "https://twitter.com/SawyerMerritt/status/1764791615061668146", "link4": ""}, {"name": "Dalian Flow Battery", "city": "Dalian", "id": "692", "external_id": "", "state": "liaoning", "country": "china", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Dalian Institute of Chemical Physics", "developer": "", "manufacturer": "", "type": "vanadium flow", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-05", "start_estimated": "", "cost_million": "266", "cost_currency": "USD", "cost_incl_solar": "", "lat": "38.858928", "long": "121.517064", "coords_hint": "3", "use_case": "peak shaving", "notes": "will be scaled up to 200mw/800mwh", "project_website": "", "link1": "https://www.pv-magazine.com/2022/09/29/china-connects-worlds-largest-redox-flow-battery-system-to-grid/", "link2": "", "link3": "", "link4": ""}, {"name": "Kenhardt 1-3", "city": "Kenhardt", "id": "693", "external_id": "", "state": "northern cape", "country": "south africa", "capacity_mwh": "1140", "estimate_mwh": "", "power_mw": "225", "customer": "", "owner": "", "developer": "scatec", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2022-10-05", "start_operation": "", "start_estimated": "", "cost_million": "1000", "cost_currency": "USD", "cost_incl_solar": "1", "lat": "-29.345075", "long": "21.149171", "coords_hint": "3", "use_case": "540MW solar farm support", "notes": "those are 3 projects that will be built", "project_website": "https://scatec.com/locations/south-africa/#kenhardt-1-3-south-africa-540-mw", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Humidor Storage I", "city": "", "id": "694", "external_id": "65703", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Hecate Grid Humidor Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sanborn BESS 3", "city": "", "id": "695", "external_id": "65672", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "175", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Quartzite", "city": "", "id": "696", "external_id": "59871", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Desert Quartzite LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vikings Energy Farm", "city": "", "id": "697", "external_id": "65711", "state": "california", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Vikings Energy Farm, LLC", "developer": "arevon", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.804395", "long": "-115.274713", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/viking/", "link1": "https://arevonenergy.com/arevon-acquires-vikings-energy-farm/", "link2": "https://www.solarpowerworldonline.com/2023/02/solv-energy-breaks-ground-solar-peaker-plant-california/", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E1B", "city": "", "id": "698", "external_id": "65674", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "280", "power_mw": "140", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arica Solar", "city": "", "id": "699", "external_id": "65744", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "272", "power_mw": "136", "customer": "", "owner": "Arica Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AVEP BESS", "city": "", "id": "700", "external_id": "65591", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "252", "power_mw": "126", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Oberon Solar Project", "city": "", "id": "701", "external_id": "65734", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "IP Oberon LLC", "developer": "Intersect Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.717864", "long": "-115.358576", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "link2": "http://www.aspeneg.com/oberon-renewable-energy-project/", "link3": "", "link4": ""}, {"name": "Oberon II Solar Project", "city": "", "id": "702", "external_id": "65735", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "IP Oberon II, LLC", "developer": "Intersect Power", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.718247", "long": "-115.35194", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-tech.org/us-government-approves-500mw-co-located-project-in-california-desert/", "link2": "http://www.aspeneg.com/oberon-renewable-energy-project/", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E4", "city": "", "id": "703", "external_id": "65675", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "218", "power_mw": "109", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sandrini Solar 100", "city": "", "id": "704", "external_id": "65664", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "190", "power_mw": "95", "customer": "", "owner": "EDPR CA Solar Park II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chiquito Grid, LLC", "city": "", "id": "705", "external_id": "65655", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Chiquito Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn E5", "city": "", "id": "706", "external_id": "65676", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "San Jacinto Grid, LLC", "city": "", "id": "707", "external_id": "65657", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "65", "customer": "", "owner": "San Jacinto Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sanborn EBESS1", "city": "", "id": "708", "external_id": "65673", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "114", "power_mw": "57", "customer": "", "owner": "Terra-Gen Operating Co-BESS", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Victory Pass", "city": "", "id": "709", "external_id": "65743", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Victory Pass I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edwards Sanborn S4", "city": "", "id": "710", "external_id": "65677", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Terra-Gen Operating Co-Hybrid", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ortega Grid, LLC", "city": "", "id": "711", "external_id": "65656", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Ortega Grid, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Energy Desert Storage 1 LLC", "city": "", "id": "712", "external_id": "65635", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Energy Desert Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carris Storage I", "city": "", "id": "713", "external_id": "65733", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Hecate Grid Carris Storage 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "NY6 Battery", "city": "", "id": "714", "external_id": "65692", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carina", "city": "", "id": "715", "external_id": "65589", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Octans", "city": "", "id": "716", "external_id": "65590", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "125", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX12 Silicon Hill Storage", "city": "", "id": "717", "external_id": "65695", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX10 Hummingbird Storage", "city": "", "id": "718", "external_id": "65693", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX15 Limousin Oak Storage", "city": "", "id": "719", "external_id": "65698", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Antlia", "city": "", "id": "720", "external_id": "65588", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX11 Republic Road Storage", "city": "", "id": "721", "external_id": "65694", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX23 Roughneck Storage", "city": "", "id": "722", "external_id": "65701", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX13 Endurance Park Storage", "city": "", "id": "723", "external_id": "65696", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX19 River Valley Storage 1", "city": "", "id": "724", "external_id": "65699", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "TX21 River Valley Storage 2", "city": "", "id": "725", "external_id": "65700", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tollgate Battery Storage Facility", "city": "", "id": "726", "external_id": "6949", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RNA Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Breach Farm", "city": "", "id": "727", "external_id": "6962", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Green Hedge Energy Barn", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hilfield Farm Tech", "city": "", "id": "728", "external_id": "7030", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Capbal", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-03-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lackenby", "city": "", "id": "729", "external_id": "7040", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lovedean Energy Storage System", "city": "", "id": "730", "external_id": "7064", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gloucestershire Science and Technology Park (small)", "city": "", "id": "731", "external_id": "7181", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Ecotricity", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2018-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordtown Energy Storage", "city": "", "id": "732", "external_id": "7234", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Shires Hamilton", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-08-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tiddlywink Barn", "city": "", "id": "733", "external_id": "7527", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "McBallester", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitminster - Solar Farm & Battery Storage", "city": "", "id": "734", "external_id": "8844", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "JBM Solar Projects 7 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Kilbride - Battery storage", "city": "", "id": "735", "external_id": "9013", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Cathkin Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Devilla Energy Storage Facility", "city": "", "id": "736", "external_id": "9248", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hales Lane - Battery Storage Facility", "city": "", "id": "737", "external_id": "9635", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drum Farm - Battery Energy Storage System", "city": "", "id": "738", "external_id": "9940", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy System Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkhaw Lane - Battery Storage", "city": "", "id": "739", "external_id": "10145", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "Walker & Son (Hauliers) Limited / Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newfields Farm - Battery Energy Storage", "city": "", "id": "740", "external_id": "10233", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "REPD Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newburgh Road, Abernethy - Battery Storage ", "city": "", "id": "741", "external_id": "10607", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "P & M Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Sleekburn - Battery Storage Compound", "city": "", "id": "743", "external_id": "10957", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Enviromena Asset Management UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Maybrook Road - Battery facility", "city": "", "id": "744", "external_id": "11008", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Conrad Energy (Develeopments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Leylodge Farmhouse, Kintore - Battery Energy Storage System", "city": "", "id": "745", "external_id": "11092", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tealing Battery Energy Storage Farm", "city": "", "id": "746", "external_id": "11097", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Sirius EcoDev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grayside Wind Farm", "city": "", "id": "747", "external_id": "11113", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Grayside WF", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chadderton - Battery energy storage facility", "city": "", "id": "748", "external_id": "11160", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Field", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-06-01", "start_construction": "2021-12-20", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Richborough Energy Park - Phase 3", "city": "", "id": "749", "external_id": "11201", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "249", "power_mw": "249", "customer": "", "owner": "Sheaf Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stocking Pelham - Battery Storage System", "city": "", "id": "750", "external_id": "11212", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Connections", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penwortham - Battery storage", "city": "", "id": "751", "external_id": "11217", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-04-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Armadale Wind Farm", "city": "", "id": "752", "external_id": "11219", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Brookfield Renewable UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bath Mews, Minsterley - 10MW Battery Storage Facility", "city": "", "id": "753", "external_id": "11369", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-05-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lowlands Farm - Battery Storage", "city": "", "id": "754", "external_id": "11399", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Patch Elm Lane - Battery Storage ", "city": "", "id": "755", "external_id": "11415", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Green Frog Ventures Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brown Edge - Battery Storage", "city": "", "id": "756", "external_id": "11418", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-03-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Melton Electricity Substation - Energy Storage System", "city": "", "id": "757", "external_id": "11436", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "26", "customer": "", "owner": "Brampton Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Teviot Wind Farm", "city": "", "id": "758", "external_id": "11442", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Muirhall Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Harrington Franklin, Richborough Energy Park - Battery Storage", "city": "", "id": "759", "external_id": "11449", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harrington Franklin Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wemyss Estate - Randolph Solar Farm & Battery Energy Storage", "city": "", "id": "760", "external_id": "11482", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Elgin Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rothienorman - Battery Energy Storage Facility", "city": "", "id": "761", "external_id": "11497", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Earthcott Green - Battery Storage", "city": "", "id": "762", "external_id": "11510", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Ecotricity Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kingston Road, Slimbridge - Battery Storage", "city": "", "id": "763", "external_id": "11516", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Relay Slimbridge Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Llwyn Onn - Solar Farm & Battery Storage", "city": "", "id": "764", "external_id": "11544", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Third Drove, Fengate - Battery Storage", "city": "", "id": "765", "external_id": "11558", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Flag Fen Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sutton Manor - Battery Storage Facility", "city": "", "id": "766", "external_id": "11559", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Sizing John Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Temple Oaks Renewable Energy Park", "city": "", "id": "767", "external_id": "11562", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "240", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Craig Watch - Wind Farm & Battery Storage", "city": "", "id": "768", "external_id": "11609", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "27", "power_mw": "27", "customer": "", "owner": "Craig Watch Wind Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grassing Rome Street - Battery Storage", "city": "", "id": "769", "external_id": "11611", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "STOR 141 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility", "city": "", "id": "770", "external_id": "11612", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "ADV 003 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Edge Lane, Maiden Law - Solar Farm & Battery Storage", "city": "", "id": "771", "external_id": "11619", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Lightsource BP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mesquite Solar 5, LLC", "city": "", "id": "772", "external_id": "65963", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mesquite Solar 4, LLC", "city": "", "id": "773", "external_id": "65962", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Nighthawk Energy Storage, LLC", "city": "", "id": "774", "external_id": "65889", "state": "california", "country": "usa", "capacity_mwh": "1200", "estimate_mwh": "600", "power_mw": "300", "customer": "arevon", "owner": "Nighthawk Energy Storage, LLC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.957486", "long": "-117.038749", "coords_hint": "3", "use_case": "", "notes": "got the coords from arevon website, but probably not the exact location yet", "project_website": "https://arevonenergy.com/location/nighthawk/", "link1": "https://arevonenergy.com/nighthawk-utility-scale-storage-facility-to-use-tesla-megapack/", "link2": "", "link3": "", "link4": ""}, {"name": "Sacramento Valley Energy Center, LLC", "city": "", "id": "775", "external_id": "65808", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Sacramento Valley Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sagebrush ESS", "city": "", "id": "776", "external_id": "65933", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Sagebrush ESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Santa Ana Storage 3", "city": "", "id": "777", "external_id": "65789", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Johanna Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Honey Creek Solar", "city": "", "id": "778", "external_id": "65821", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Andover Energy Storage Project", "city": "", "id": "779", "external_id": "65952", "state": "new jersey", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI 25 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chill Sun Solar Project", "city": "", "id": "780", "external_id": "65895", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "4500", "power_mw": "2250", "customer": "", "owner": "Naturgy Candela DevCo LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bowling Green Energy Storage Project", "city": "", "id": "781", "external_id": "65951", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "VESI 21 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2022-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Goldenrod Creek Solar and BESS SLF", "city": "", "id": "782", "external_id": "65845", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1320", "power_mw": "660", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lunis Creek Solar and BESS SLF", "city": "", "id": "783", "external_id": "65852", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1242", "power_mw": "621", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clear Fork Creek Solar and BESS SLF", "city": "", "id": "784", "external_id": "65842", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1200", "power_mw": "600", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dogwood Creek Solar and BESS", "city": "", "id": "785", "external_id": "65843", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "886", "power_mw": "443", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hollow Branch Creek 2 Solar and BESS SLF", "city": "", "id": "786", "external_id": "65851", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rowdy Creek Solar and BESS", "city": "", "id": "787", "external_id": "65854", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.639763", "long": "-95.58367", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, {"name": "Tehuacana Creek 1 Solar and BESS", "city": "", "id": "788", "external_id": "65855", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.02785", "long": "-96.498753", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, {"name": "Tehuacana Creek 2 Solar and BESS", "city": "", "id": "789", "external_id": "65856", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "350", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.025913", "long": "-96.503077", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, {"name": "Middlebrook Creek Solar and BESS", "city": "", "id": "790", "external_id": "65853", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "604", "power_mw": "302", "customer": "", "owner": "Solar Proponent LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.598849", "long": "-94.598401", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.solarproponent.com/projects/#", "link2": "", "link3": "", "link4": ""}, {"name": "Zeya", "city": "", "id": "791", "external_id": "65880", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cachi", "city": "", "id": "792", "external_id": "65861", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Castor", "city": "", "id": "793", "external_id": "65870", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desna", "city": "", "id": "794", "external_id": "65876", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eldora Energy LLC", "city": "", "id": "795", "external_id": "65847", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Eldora Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Avila", "city": "", "id": "796", "external_id": "65860", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "320", "power_mw": "160", "customer": "", "owner": "Broad Reach Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KCE TX 14: Venus Mill Storage", "city": "", "id": "797", "external_id": "65788", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elio Energy LLC", "city": "", "id": "798", "external_id": "65850", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Elio Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Oriana Solar LLC", "city": "", "id": "799", "external_id": "65849", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Oriana Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Talitha Energy Project, LLC", "city": "", "id": "800", "external_id": "65891", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Talitha Energy Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newhouse Farm - Energy Storage Facility", "city": "", "id": "801", "external_id": "9047", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fiddlers Ferry Power Station - Battery storage", "city": "", "id": "802", "external_id": "9404", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "SSE Enterprise (SSE PLC)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kilmarnock South Substation - Battery storage", "city": "", "id": "803", "external_id": "9696", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-02-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "North Walpole, St Peter - Battery Energy Storage", "city": "", "id": "804", "external_id": "9762", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Roc Noir Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ochiltree - Battery Sorage", "city": "", "id": "805", "external_id": "10162", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bullen Lane - Battery Storage", "city": "", "id": "806", "external_id": "10311", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Cambridge Power Limited / Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Uskmouth Power Station - Battery Storage", "city": "", "id": "807", "external_id": "10936", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "230", "power_mw": "230", "customer": "", "owner": "Simec Atlantic Energy Uskmouth Power Station", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Bendings - Battery Storage", "city": "", "id": "808", "external_id": "10985", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Fiddes Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gotham - Battery Energy storage", "city": "", "id": "809", "external_id": "10986", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Net Zero Energy Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ash Lane, Little London - Battery Storage", "city": "", "id": "810", "external_id": "11090", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Bramley BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Worset Lane - Battery Energy Storage System", "city": "", "id": "811", "external_id": "11406", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Clearstone Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Staffordshire Railway Walk, Castlecroft - Battery Storage", "city": "", "id": "812", "external_id": "11414", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Neil Fox Way - Battery Storage", "city": "Wakefield", "id": "813", "external_id": "11519", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.67289", "long": "-1.46662", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://planning.wakefield.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=REJXN6QQFWN00", "link2": "", "link3": "", "link4": ""}, {"name": "Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm", "city": "", "id": "814", "external_id": "11623", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "66", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility", "city": "", "id": "815", "external_id": "11636", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Kronos Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "High Road, Saddlebow - Battery Storage", "city": "", "id": "816", "external_id": "11648", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Lynn Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Knockkippen Wind, Solar & Battery Farm", "city": "", "id": "817", "external_id": "11676", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Falck Renewables / REG Windpower", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dragons Lane - Battery Storage Facility", "city": "", "id": "818", "external_id": "11701", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Hydrock", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clay Tye Farm Phase 1 - Storage Facility", "city": "Upminster", "id": "819", "external_id": "11720", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2017-07-18", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552891", "long": "0.293464", "coords_hint": "", "use_case": "", "notes": "Duplicate of 76", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clay Tye Farm Phase 2 - Storage Facility", "city": "Upminster", "id": "820", "external_id": "11721", "state": "london", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2018-09-10", "start_construction": "2022-07-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.552891", "long": "0.293464", "coords_hint": "", "use_case": "", "notes": "Duplicate of 76", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Indian Queens Sub-Station - Battery Storage", "city": "", "id": "821", "external_id": "11725", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "Prime Energy Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Catsbrain Farm - Battery Storage ", "city": "", "id": "822", "external_id": "11787", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Conrad Energy (Developments) II Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Says Court Farm, Coalpit Heath - Battery Energy Storage", "city": "", "id": "823", "external_id": "11793", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Raith (Glenniston)", "city": "Auchtertool", "id": "824", "external_id": "11808", "state": "fife", "country": "uk", "capacity_mwh": "99", "estimate_mwh": "", "power_mw": "49.5", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "2023-10", "start_estimated": "2023Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-little-raith-bess/", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://planning.fife.gov.uk/online/applicationDetails.do?keyVal=READTEHF1AL00&activeTab=summary", "link3": "", "link4": ""}, {"name": "Fairholme, Minety - Battery Storage", "city": "", "id": "825", "external_id": "11810", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stonehill, Minety", "city": "", "id": "826", "external_id": "11812", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Penso Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whites Farm - Battery Storage", "city": "", "id": "827", "external_id": "11880", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sclenteuch Wind Farm ", "city": "", "id": "828", "external_id": "11987", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Braintree Road, Cressing - Battery Storage", "city": "", "id": "829", "external_id": "11995", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivot Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Househill House, Househill - Battery Storage", "city": "", "id": "830", "external_id": "12056", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sandy Knowe Wind Farm Extension", "city": "", "id": "831", "external_id": "12080", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Executive Resource Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lancaster Power Extension, Middleton Road - Energy Storage Facility", "city": "", "id": "832", "external_id": "12125", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Infra Balance New Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hele Manor Farm, Bradford On Tone - Battery Storage System", "city": "", "id": "833", "external_id": "12174", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "STOR 107 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Waterloo Farm, Furbarn Road - Battery Storage", "city": "", "id": "834", "external_id": "12187", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Redcote Lane, Armley - Battery Storage Facility", "city": "", "id": "835", "external_id": "12224", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Leeds Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hawkers Hill Energy Park", "city": "", "id": "836", "external_id": "12293", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Tag Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2017-09-22", "start_construction": "2020-05-05", "start_operation": "2022-10-03", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Back Lane, Skerne - Solar Farm & Battery Storage", "city": "", "id": "837", "external_id": "12297", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "BayWa r.e. UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2020-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batterie Diespeck", "city": "", "id": "838", "external_id": "SEE995000682977", "state": "bavaria", "country": "germany", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-08", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMAREG4 Wartburgspeicher Eisenach", "city": "", "id": "839", "external_id": "SEE954649497618", "state": "thuringia", "country": "germany", "capacity_mwh": "67", "estimate_mwh": "", "power_mw": "60", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-18", "start_construction": "", "start_operation": "", "start_estimated": "2022-12-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Batterie Iphofen", "city": "", "id": "840", "external_id": "SEE934353123843", "state": "bavaria", "country": "germany", "capacity_mwh": "20", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-18", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bad D\u00fcben Battery Storage", "city": "", "id": "841", "external_id": "SEE961989517128", "state": "saxony", "country": "germany", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-10-19", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elsteraue Battery Storage", "city": "", "id": "842", "external_id": "SEE932907515472", "state": "saxony-anhalt", "country": "germany", "capacity_mwh": "16", "estimate_mwh": "", "power_mw": "13", "customer": "", "owner": "", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lessines", "city": "", "id": "843", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "100", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "", "developer": "Corsica Sole", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-11", "start_estimated": "", "cost_million": "33", "cost_currency": "EUR", "cost_incl_solar": "0", "lat": "50.72743", "long": "3.854307", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://insideevs.com/news/625965/tesla-megapack-battery-belgium/", "link2": "", "link3": "", "link4": ""}, {"name": "Bumpers", "city": "Princes Risborough", "id": "844", "external_id": "", "state": "buckinghamshire", "country": "uk", "capacity_mwh": "198", "estimate_mwh": "", "power_mw": "99", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "56", "status": "operation", "date_first_heard": "", "start_construction": "2022-10-17", "start_operation": "2023-10", "start_estimated": "2023-08-25", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.7485", "long": "-0.88913", "coords_hint": "1", "use_case": "", "notes": "Construction dates from TTRO application", "project_website": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-bumpers-bess/", "link1": "https://docs.planning.org.uk/20211124/124/R1F0N4SCKAZ00/pev22n27dqbm87mh.pdf", "link2": "https://api-gb.one.network/downloads/tm/1016/ttro-application-form_131178395_3494207_17135d8618.pdf", "link3": "https://planning.org.uk/app/124/R1F0N4SCKAZ00", "link4": "https://twitter.com/heitplc/status/1679460677226823680"}, {"name": "Broadditch", "city": "Southfleet", "id": "845", "external_id": "", "state": "kent", "country": "uk", "capacity_mwh": "22", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "6", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-12-01", "start_estimated": "2022Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.41493", "long": "0.32622", "coords_hint": "1", "use_case": "", "notes": "uses the megapack xl", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://docs.planning.org.uk/20211013/85/R07CFUBQJGV00/lu3um7x6cbswjxy0.pdf", "link3": "", "link4": ""}, {"name": "Pillswood Phase 2", "city": "Cottingham", "id": "846", "external_id": "7360", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "98", "estimate_mwh": "", "power_mw": "49", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Tesla", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "39", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-11-21", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "53.79991", "long": "-0.41056", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://www.insidermedia.com/news/yorkshire/battery-energy-storage-facility-brought-online", "link3": "https://www.londonstockexchange.com/news-article/HEIT/pillswood-energisation/15722939", "link4": "https://twitter.com/Tesla_Megapack/status/1661649261757612032"}, {"name": "Farnham", "city": "Farnham", "id": "847", "external_id": "", "state": "surrey", "country": "uk", "capacity_mwh": "40", "estimate_mwh": "", "power_mw": "20", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-05", "start_estimated": "2023Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "51.18894", "long": "-0.82903032", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.heitp.co.uk/content/uploads/2022/09/263502_Harmony_RA_2022_Web.pdf", "link2": "https://modgov.waverley.gov.uk/documents/s24387/Western06Jun18%20-%20B1%20-%20Land%20to%20the%20rear%20of%20substation.pdf", "link3": "https://www.heitp.co.uk/portfolio/projects-overview/key-information-about-farnham-bess/", "link4": ""}, {"name": "Wormald Green", "city": "Harrogate", "id": "848", "external_id": "", "state": "yorkshire", "country": "uk", "capacity_mwh": "", "estimate_mwh": "66", "power_mw": "33", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.07548", "long": "-1.52312", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, {"name": "Hawthorn Pit", "city": "Murton", "id": "849", "external_id": "", "state": "county durham", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99.8", "power_mw": "49.9", "customer": "", "owner": "Harmony Energy Income Trust", "developer": "Harmony Energy Limited / Ritchie Bland Energy No. 2 Ltd", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024Q2", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "54.80552", "long": "-1.40646", "coords_hint": "0", "use_case": "", "notes": "Failed Oct 2022 C share placement puts construction in doubt", "project_website": "", "link1": "https://www.theaic.co.uk/aic/news/citywire-news/harmony-energy-looks-at-fund-options-after-c-share-flop", "link2": "https://www.investegate.co.uk/harmony-energy-inc.--heit-/rns/acquisition-of-three-pipeline-projects/202212150700037588J/", "link3": "", "link4": ""}, {"name": "Western Downs Battery", "city": "South West Queensland", "id": "850", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "540", "estimate_mwh": "", "power_mw": "270", "customer": "Neoen Australia", "owner": "Neoen", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2022-12-29", "start_construction": "2023-01", "start_operation": "", "start_estimated": "2025Q1", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-26.976142", "long": "150.666771", "coords_hint": "2", "use_case": "solar farm support", "notes": "", "project_website": "https://westerndownsgreenpowerhub.com.au/", "link1": "https://neoen.com/en/news/2022/neoen-launches-construction-of-its-200-mw-400-mwh-western-downs-battery-in-queensland-australia/", "link2": "https://neoen.com/en/news/2023/neoen-expands-the-size-of-its-western-downs-battery-in-queensland-australia-to-270-mw-540-mwh/", "link3": "", "link4": ""}, {"name": "Sierra Estrella Energy Storage", "city": "", "id": "851", "external_id": "66334", "state": "arizona", "country": "usa", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "276", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.410648", "long": "-112.313765", "coords_hint": "1", "use_case": "", "notes": "got the location from the map on the projects page / nr of megapacks from the pdf", "project_website": "https://www.sierraestrellaenergystorage.com/about", "link1": "https://www.sierraestrellaenergystorage.com/s/01_11-07-2022_READ-ONLY_Sierra-Estrella-LS-208_FullSize.pdf", "link2": "", "link3": "", "link4": ""}, {"name": "Superstition Energy Storage", "city": "Gilbert", "id": "852", "external_id": "66333", "state": "arizona", "country": "usa", "capacity_mwh": "360", "estimate_mwh": "", "power_mw": "90", "customer": "Salt River Project", "owner": "", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.358927", "long": "-111.831039", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "https://www.superstitionenergystorage.com/about", "link1": "https://www.energy-storage.news/arizona-utility-srp-to-arrive-at-800mw-battery-storage-by-mid-2024-with-two-new-deals/", "link2": "https://twitter.com/SharifaDarani/status/1612314447074439168", "link3": "", "link4": ""}, {"name": "Desert Peak Energy Storage I", "city": "", "id": "853", "external_id": "65987", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "650", "power_mw": "325", "customer": "", "owner": "Desert Peak Energy Storage I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "CED West Side Canal Battery Storage", "city": "", "id": "854", "external_id": "65980", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "262", "power_mw": "131", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lancaster Area Battery", "city": "", "id": "855", "external_id": "66050", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "254", "power_mw": "127", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Peak Energy Storage II", "city": "", "id": "856", "external_id": "65988", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Desert Peak Energy Storage II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES Waiawa Phase 2 Solar", "city": "", "id": "857", "external_id": "66066", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "AES Distributed Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Camp Lejeune Solar and Energy Storage", "city": "", "id": "858", "external_id": "59966", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "Duke Energy Progress - (NC)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "House Mountain", "city": "", "id": "859", "external_id": "66006", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "63", "customer": "", "owner": "House Mountain", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peony Solar 1", "city": "", "id": "861", "external_id": "66131", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "124", "power_mw": "62", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trinity River Solar 1", "city": "", "id": "862", "external_id": "66132", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Zier Solar", "city": "", "id": "863", "external_id": "66137", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Cypress Creek Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Condor", "city": "", "id": "864", "external_id": "66285", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "34.020505", "long": "-117.332255", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/condor/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/", "link2": "", "link3": "", "link4": ""}, {"name": "Peregrine", "city": "San Diego", "id": "865", "external_id": "66286", "state": "california", "country": "usa", "capacity_mwh": "800", "estimate_mwh": "", "power_mw": "200", "customer": "arevon", "owner": "", "developer": "tenaska", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-10-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "32.692183", "long": "-117.13667", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://arevonenergy.com/location/peregrine/", "link1": "https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/", "link2": "", "link3": "", "link4": ""}, {"name": "Oneida Energy Storage Project", "city": "Haldimand County", "id": "866", "external_id": "", "state": "ontario", "country": "canada", "capacity_mwh": "1000", "estimate_mwh": "", "power_mw": "250", "customer": "NRStor", "owner": "Northland Power ** SNGRDC", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-10", "start_construction": "", "start_operation": "", "start_estimated": "2025", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "42.886859", "long": "-80.12224", "coords_hint": "3", "use_case": "", "notes": "The article mentions Jarvis in Haldimand County", "project_website": "https://www.snfuture.com/projects/oneida-energy-storage/", "link1": "https://driveteslacanada.ca/energy/nrstor-to-build-250mw-1000mwh-tesla-megapack-project-in-ontario/", "link2": "", "link3": "", "link4": ""}, {"name": "Jurong Island", "city": "", "id": "867", "external_id": "", "state": "", "country": "singapore", "capacity_mwh": "285", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "", "developer": "sembcorp", "manufacturer": "huawei", "type": "", "cells": "lfp", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-02-02", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "1.266316", "long": "103.703028", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/southeast-asias-biggest-battery-storage-project-officially-opened-in-singapore/", "link2": "", "link3": "", "link4": ""}, {"name": "Manor Farm Energy Storage", "city": "", "id": "868", "external_id": "6948", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Innova Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-11-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clash Gour", "city": "", "id": "869", "external_id": "7178", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Renewables/ Force 9 ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sheirdrim Renewable Energy Development - Battery", "city": "", "id": "870", "external_id": "7585", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "38", "power_mw": "38", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2019-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Welkin Mill", "city": "", "id": "871", "external_id": "7832", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wissett Solar Farm, Wissett - Battery Storage", "city": "", "id": "872", "external_id": "9913", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whitehill Energy Storage", "city": "", "id": "873", "external_id": "10466", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newmarket Road, Bottisham - Battery Energy Storage", "city": "", "id": "874", "external_id": "10486", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shaftesbury Energy Park - Battery Storage System", "city": "", "id": "875", "external_id": "10626", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": " TagEnergy ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rothienorman - Battery Storage", "city": "", "id": "876", "external_id": "10638", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hopsrig Wind Farm", "city": "", "id": "877", "external_id": "11066", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Muirhall Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Staythorpe Road - Battery energy storage", "city": "", "id": "878", "external_id": "11321", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Ecap Staythorpe BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Swangate Project - Energy Storage System", "city": "", "id": "879", "external_id": "11437", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Econergy International Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2017-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Overhill Farm, Rothienorman - Battery Energy Storage", "city": "", "id": "880", "external_id": "11590", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Beanit Farm, Balsall Common - Battery Storage", "city": "", "id": "881", "external_id": "11656", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Penso Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rectory Farm, Rectory Lane - Battery Storage", "city": "", "id": "882", "external_id": "11905", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hillside Farm, Lancaster Road - Battery Storage", "city": "", "id": "883", "external_id": "11948", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Hamilton March", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coalburn II Energy Storage Facility - Battery Storage Facility", "city": "", "id": "884", "external_id": "12206", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "1000", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage", "city": "", "id": "885", "external_id": "12303", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Flexion Energy UK Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ryton End, Barston - Battery Storage", "city": "", "id": "886", "external_id": "12348", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Greenfield Energy Consultancy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Killoch Depot, Killoch Colliery - Battery Storage", "city": "", "id": "887", "external_id": "12349", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Brockwell Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sellindge Substation, Church Lane - Battery Storage", "city": "", "id": "888", "external_id": "12351", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Pivoted Power Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pound Road, Hawkchurch - Battery Energy Storage", "city": "", "id": "889", "external_id": "12360", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "120", "customer": "", "owner": "Enso Green Holdings B Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sunny Oaks Renewable Energy Park", "city": "", "id": "890", "external_id": "12415", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "28", "power_mw": "28", "customer": "", "owner": "Sunny Oaks Renewable Energy Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "John Green Frog Power Compound, John North Road - Battery System", "city": "", "id": "891", "external_id": "12455", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Green Frog Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Electricity Substation, Westerton Road - Battery Storage", "city": "", "id": "892", "external_id": "12467", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Keith Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eggborough Power Station, Selby Road - Battery Storage", "city": "", "id": "893", "external_id": "12483", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Eggborough Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Capenhurst Lane, Capenhurst - Battery Storage", "city": "", "id": "894", "external_id": "12503", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power BESS Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yarra Industrial Estate, Loicher Lane - Battery Storage", "city": "", "id": "895", "external_id": "12524", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Ecclesfield Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Norwich Road Industrial Estate", "city": "", "id": "896", "external_id": "12529", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Eelpower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-03-26", "start_construction": "2022-04-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aspley House Farm, Aspley Lane - Battery Storage Facility", "city": "", "id": "897", "external_id": "12571", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "898", "external_id": "12649", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walpole Sub Station, Walpole Bank - Battery Storage", "city": "", "id": "899", "external_id": "12683", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Field Devco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Misslebrook Farm, Botley Road - Battery Storage", "city": "", "id": "900", "external_id": "12691", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Boom Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Freshfields, Fairy Lane - Battery Storage", "city": "", "id": "901", "external_id": "12694", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "STOR Power Utilities Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Landulph, Ellbridge Lane - Battery Storage Facility", "city": "", "id": "902", "external_id": "12697", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pivoted Power Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Southfields Farm, Common Lane - Battery Storage", "city": "", "id": "903", "external_id": "12698", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "Toton Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "North Lincolnshire Green Energy Park", "city": "", "id": "904", "external_id": "12706", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Solar 21 Renewable Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "National Grid Electricity Substation, Capenhurst Lane - Battery Storage", "city": "", "id": "905", "external_id": "12725", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Zenobe Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "2021-02-01", "start_construction": "2021-06-01", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ourack", "city": "", "id": "906", "external_id": "12727", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vattenfall", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newburn Bridge Road - Battery Storage Facility", "city": "", "id": "907", "external_id": "12729", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Aura Power Storage Solutions", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barlow Road, Barlow Road - Battery Storage", "city": "", "id": "908", "external_id": "12734", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility", "city": "", "id": "909", "external_id": "12780", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Balnacraig Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Green Lane, Thurcroft - Battery Energy Storage Facility", "city": "", "id": "910", "external_id": "12789", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "85", "power_mw": "85", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cirencester Solar Farm", "city": "", "id": "911", "external_id": "12791", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Warrington Borough Council / Statkraft", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "2015-09-17", "start_construction": "2018-09-06", "start_operation": "2022-10-13", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "912", "external_id": "12803", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Capbal Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Armshead Farm, Armshead Road - Battery Energy Storage Facility", "city": "", "id": "913", "external_id": "12804", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Conrad Energy (Developments) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackhill Quarry, Woodbury - Battery Energy Storage Facility", "city": "", "id": "914", "external_id": "12815", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Clinton Devon Estates", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chesters - Millmoor Rig Wind Farm & Battery Energy Storage", "city": "", "id": "915", "external_id": "12821", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "ESB Asset Development UK Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility", "city": "", "id": "916", "external_id": "12823", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Elgin Energy Es Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bengrove Farm, Base Lane - Battery Storage", "city": "", "id": "917", "external_id": "12830", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Bengrove Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kirkton Energy Farm", "city": "", "id": "918", "external_id": "12876", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Kirkton Wind Farm Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tomchrasky Estate Wind farm", "city": "", "id": "919", "external_id": "12877", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "E Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "St Michaels Road, Ditton Road - Battery Storage", "city": "", "id": "920", "external_id": "12904", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Shell Green Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bradford West, Harrop Lane, Wilsden - Battery Storage", "city": "", "id": "921", "external_id": "12909", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "J3 Business Park - Battery Energy Storage Facility", "city": "", "id": "922", "external_id": "12920", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Forepower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "923", "external_id": "12936", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coventry Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage", "city": "", "id": "924", "external_id": "12941", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Low Carbon Solar Park 20 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Long Pasture Farm, Little Stainton - Solar Farm", "city": "", "id": "925", "external_id": "12952", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Electric Works", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lowlands Farm - Battery Storage", "city": "", "id": "926", "external_id": "12959", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hillside Farm, Lancaster Road - Battery Storage", "city": "", "id": "927", "external_id": "12964", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Hamilton March", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Welkin Mill, Welkin Road - Battery Storage", "city": "", "id": "928", "external_id": "12982", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Noriker Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scawd Law Wind Farm", "city": "", "id": "929", "external_id": "13000", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Fred Olsen Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eccles Substation, Eccles - Battery Energy Storage System", "city": "", "id": "930", "external_id": "13003", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Eccles Grid Stability Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mount Pleasant Farm, Green Lane - Battery Storage", "city": "", "id": "931", "external_id": "13011", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Barton Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sunlight Storage", "city": "", "id": "932", "external_id": "65857", "state": "california", "country": "usa", "capacity_mwh": "920", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Sunlight Storage, LLC", "developer": "NextEra", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "33.803544", "long": "-115.401622", "coords_hint": "1", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.energy-storage.news/230mw-bess-comes-online-at-bureau-of-land-management-site-in-california/", "link2": "", "link3": "", "link4": ""}, {"name": "North Central Valley", "city": "", "id": "933", "external_id": "66208", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "132", "customer": "", "owner": "North Central Valley Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Buena Vista Energy LLC", "city": "", "id": "934", "external_id": "56446", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clairemont Energy Storage", "city": "", "id": "935", "external_id": "66266", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paradise Energy Storage", "city": "", "id": "936", "external_id": "66265", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Jicarilla Solar 1 LLC", "city": "", "id": "937", "external_id": "66163", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Repsol Renewables NA", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Crossett Power Management LLC", "city": "", "id": "938", "external_id": "66009", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "406", "power_mw": "203", "customer": "", "owner": "Crossett Power Management LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Revolution", "city": "", "id": "939", "external_id": "66170", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Crane 2 BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Flower Valley II", "city": "", "id": "940", "external_id": "66007", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "202", "power_mw": "101", "customer": "", "owner": "Flower Valley II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-04-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Swoose II", "city": "", "id": "941", "external_id": "66008", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "202", "power_mw": "101", "customer": "", "owner": "Swoose II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2022-08-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yaupon Solar Project (Hybrid)", "city": "", "id": "942", "external_id": "66216", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Yaupon Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barilla Solar", "city": "", "id": "943", "external_id": "58710", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Parowan Solar", "city": "", "id": "944", "external_id": "65823", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "116", "power_mw": "58", "customer": "", "owner": "Leeward Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Menifee Power Bank", "city": "", "id": "947", "external_id": "66494", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Nova Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sunlight Storage II", "city": "", "id": "948", "external_id": "66575", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "460", "power_mw": "230", "customer": "", "owner": "Sunlight Storage II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Solar Blue", "city": "", "id": "949", "external_id": "63848", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "450", "power_mw": "225", "customer": "", "owner": "Westlands Solar Blue (OZ) Owner, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Proxima", "city": "", "id": "952", "external_id": "66270", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "324", "power_mw": "162", "customer": "", "owner": "Proxima Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chestnut", "city": "", "id": "953", "external_id": "63849", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "Chestnut Westside, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Grid Gwent Storage 1", "city": "", "id": "954", "external_id": "66409", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "270", "power_mw": "135", "customer": "", "owner": "Hecate Grid Gwent Storage 1, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beaumont BESS", "city": "", "id": "955", "external_id": "66461", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Placerita ESS", "city": "", "id": "956", "external_id": "66462", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Baldy Mesa Solar & Storage", "city": "", "id": "957", "external_id": "66598", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stanton Battery Energy Storage", "city": "", "id": "958", "external_id": "66423", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "136", "power_mw": "68", "customer": "", "owner": "Wellhead Services, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "VESI Pomona", "city": "", "id": "960", "external_id": "50300", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI Pomona Energy Storage, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Melrose BESS", "city": "", "id": "961", "external_id": "66281", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pala Gomez Creek BESS", "city": "", "id": "962", "external_id": "66280", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Boulevard Energy Storage", "city": "", "id": "963", "external_id": "66279", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elliott Energy Storage", "city": "", "id": "964", "external_id": "66278", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BCE Los Alamitos 1", "city": "", "id": "965", "external_id": "66533", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Bright Canyon Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BCE Los Alamitos 2", "city": "", "id": "966", "external_id": "66532", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Bright Canyon Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aragon Energy Storage", "city": "", "id": "967", "external_id": "66431", "state": "georgia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Aragon Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hemmingway BESS", "city": "", "id": "968", "external_id": "66325", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Black Mesa BESS", "city": "", "id": "969", "external_id": "66326", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grey Fox Wind", "city": "", "id": "970", "external_id": "65939", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Grey Fox Wind", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mulligan Solar, LLC", "city": "", "id": "971", "external_id": "65349", "state": "illinois", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Mulligan Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Buena Vista Energy Center", "city": "", "id": "974", "external_id": "66408", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Buena Vista Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yellow Pine Solar", "city": "", "id": "975", "external_id": "66357", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "96", "power_mw": "48", "customer": "", "owner": "Yellow Pine Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Springwater Solar, LLC", "city": "", "id": "976", "external_id": "65900", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Springwater Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Salt City Solar Project - Hybrid", "city": "", "id": "977", "external_id": "65302", "state": "ohio", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Salt City Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Energy Ramsey Storage", "city": "", "id": "978", "external_id": "66414", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "1000", "power_mw": "500", "customer": "", "owner": "Hecate Energy Ramsey Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ash Creek BESS", "city": "", "id": "979", "external_id": "66391", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "612", "power_mw": "306", "customer": "", "owner": "ACTX BESS Project LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "OCI SunRoper", "city": "", "id": "980", "external_id": "65893", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "520", "power_mw": "260", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Five Wells Solar Center - Hybrid", "city": "", "id": "981", "external_id": "66420", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "518", "power_mw": "259", "customer": "", "owner": "Five Wells Solar Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Grid East Valley Storage", "city": "", "id": "982", "external_id": "66411", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "510", "power_mw": "255", "customer": "", "owner": "Hecate Grid East Valley Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tidwell Prairie Storage 1", "city": "", "id": "983", "external_id": "66337", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Tidwell Prairie", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "OCI Hillsboro", "city": "", "id": "984", "external_id": "66401", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 7 BESS 1", "city": "", "id": "985", "external_id": "66297", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 7 BESS 2", "city": "", "id": "986", "external_id": "66298", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Crane 2 BESS 2", "city": "", "id": "987", "external_id": "66300", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton BESS 2", "city": "", "id": "988", "external_id": "66303", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Uvalde 2 BESS 2", "city": "", "id": "989", "external_id": "66305", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peregrine BESS 1", "city": "", "id": "990", "external_id": "66301", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peregrine BESS 2", "city": "", "id": "991", "external_id": "66302", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "St. Gall Energy Storage I", "city": "", "id": "992", "external_id": "66336", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "St. Gall Energy Storage I", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 3 BESS 2", "city": "", "id": "993", "external_id": "66293", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 4 BESS", "city": "", "id": "994", "external_id": "66294", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 5 BESS 1", "city": "", "id": "995", "external_id": "66295", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alamo 5 BESS 2", "city": "", "id": "996", "external_id": "66296", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Callisto I Energy Center", "city": "", "id": "997", "external_id": "66338", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Callisto I Energy Center", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bexar ESS", "city": "", "id": "998", "external_id": "66400", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "OCI Solar Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peeler Solar, LLC", "city": "", "id": "999", "external_id": "65932", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Peeler Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Gaia Hybrid", "city": "", "id": "1000", "external_id": "66342", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "152", "power_mw": "76", "customer": "", "owner": "Samsung Solar Energy 2, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Uvalde 2 BESS 1", "city": "", "id": "1001", "external_id": "66304", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Consolidated Edison Development Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eagle Springs Hybrid", "city": "", "id": "1002", "external_id": "66341", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "122", "power_mw": "61", "customer": "", "owner": "Samsung Solar Energy 2, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "MRG Goody Solar Project Hybrid", "city": "", "id": "1003", "external_id": "66390", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "MRG Goody Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grizzly Ridge Solar", "city": "", "id": "1004", "external_id": "66410", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Grizzly Ridge Solar LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Powells Creek Solar - Hybrid", "city": "", "id": "1005", "external_id": "65305", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "17", "customer": "", "owner": "Powells Creek Farm Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sunnybrook Solar Project - Hybrid", "city": "", "id": "1006", "external_id": "65307", "state": "virginia", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Sunnybrook Farm Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "McFarland B Solar and Storage", "city": "", "id": "1008", "external_id": "66637", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "McFarland A Solar and Storage", "city": "", "id": "1009", "external_id": "66636", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Saint Energy Storage II LLC", "city": "", "id": "1010", "external_id": "66716", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Saint Energy Storage II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cald BESS", "city": "", "id": "1012", "external_id": "66617", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Cald BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hanford BESS", "city": "", "id": "1013", "external_id": "66660", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Hanford BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Henrietta BESS", "city": "", "id": "1014", "external_id": "66661", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "198", "power_mw": "99", "customer": "", "owner": "Henrietta BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Malaga BESS", "city": "", "id": "1015", "external_id": "66659", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "194", "power_mw": "97", "customer": "", "owner": "Malaga BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Inland Empire Energy Storage", "city": "", "id": "1016", "external_id": "66726", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tumbleweed Energy Storage", "city": "", "id": "1017", "external_id": "66666", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Tumbleweed Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Resurgence Solar II", "city": "", "id": "1018", "external_id": "66620", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Resurgence Solar II", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "BIA BESS", "city": "", "id": "1019", "external_id": "66662", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "64", "power_mw": "32", "customer": "", "owner": "Hanford BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Ford Flat", "city": "", "id": "1020", "external_id": "66669", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "West Ford Flat Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bear Canyon", "city": "", "id": "1021", "external_id": "66650", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "26", "power_mw": "13", "customer": "", "owner": "Bear Canyon Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lake Mabel Storage", "city": "", "id": "1022", "external_id": "66641", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wimauma Storage", "city": "", "id": "1023", "external_id": "66640", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vermillion Rise Solar", "city": "", "id": "1024", "external_id": "65935", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Vermillion Rise Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KCE NY 10, LLC", "city": "", "id": "1025", "external_id": "66682", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alfred Oaks Solar, LLC", "city": "", "id": "1026", "external_id": "66675", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Alfred Oaks Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cold Creek Solar", "city": "", "id": "1027", "external_id": "66674", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Cold Creek Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wolf Tank Storage", "city": "", "id": "1028", "external_id": "66616", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Wolf Tank Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coati Solar, LLC", "city": "", "id": "1029", "external_id": "66693", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "280", "power_mw": "140", "customer": "", "owner": "Coati Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-01", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bright Arrow Solar, LLC", "city": "", "id": "1030", "external_id": "66688", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "206", "power_mw": "103", "customer": "", "owner": "Bright Arrow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brazos Bend BESS, LLC", "city": "", "id": "1031", "external_id": "66690", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Brazos Bend BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Seven Flags BESS LLC", "city": "", "id": "1032", "external_id": "66689", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Seven Flags BESS LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holly Branch Solar, LLC", "city": "", "id": "1033", "external_id": "66692", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Holly Branch Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Briggs Solar, LLC", "city": "", "id": "1034", "external_id": "66691", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Briggs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SR McNeal", "city": "", "id": "1035", "external_id": "66925", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "SR McNeal, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Raceway Solar & Storage", "city": "", "id": "1036", "external_id": "66773", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bottleneck Energy Storage", "city": "", "id": "1037", "external_id": "66757", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "160", "power_mw": "80", "customer": "", "owner": "VESI 12 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elevate Pier S", "city": "", "id": "1038", "external_id": "66787", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Pier S Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Estrella Solar & Storage", "city": "", "id": "1039", "external_id": "66772", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "56", "power_mw": "28", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Baldy Mesa 2_Silver Peak Hybrid", "city": "", "id": "1040", "external_id": "66885", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elevate Middletown", "city": "", "id": "1041", "external_id": "66786", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "550", "power_mw": "275", "customer": "", "owner": "Elevate Middletown, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KCE CT 1, LLC", "city": "", "id": "1042", "external_id": "66879", "state": "connecticut", "country": "usa", "capacity_mwh": "", "estimate_mwh": "210", "power_mw": "105", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "MacDill Storage", "city": "", "id": "1043", "external_id": "66869", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dover Solar", "city": "", "id": "1044", "external_id": "66129", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pike County Energy Storage", "city": "", "id": "1045", "external_id": "66881", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Indianapolis Power & Light Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Justin Court Energy Storage", "city": "", "id": "1046", "external_id": "66758", "state": "new jersey", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "VESI 23 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sky Ranch Solar and Storage", "city": "", "id": "1047", "external_id": "66814", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Sky Ranch Solar and Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Reid Gardner", "city": "", "id": "1048", "external_id": "2324", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "440", "power_mw": "220", "customer": "", "owner": "Nevada Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bonanza Solar and Storage Project", "city": "", "id": "1049", "external_id": "66908", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "390", "power_mw": "195", "customer": "", "owner": "EDF Renewables Development, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hecate Grid Intrepid", "city": "", "id": "1050", "external_id": "66911", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Hecate Grid Intrepid 1 LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KCE NY 29, LLC", "city": "", "id": "1051", "external_id": "66862", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Key Capture Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elevate Arthur Kill", "city": "", "id": "1052", "external_id": "66785", "state": "new york", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "GB Arthur Kill Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "GulfStar Power, LLC", "city": "", "id": "1053", "external_id": "66871", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "GulfStar Power, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Borden County BESS", "city": "", "id": "1054", "external_id": "66804", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Borden County Battery Energy Storage System LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Myrtle Storage", "city": "", "id": "1055", "external_id": "66913", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Myrtle Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Danish Fields Storage", "city": "", "id": "1056", "external_id": "66916", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Danish Fields Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lupinus Solar 2, LLC", "city": "", "id": "1057", "external_id": "66896", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "244", "power_mw": "122", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Estonian Solar Project, LLC", "city": "", "id": "1058", "external_id": "66872", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Enel Green Power Estonian Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ables Springs Solar & Storage", "city": "", "id": "1059", "external_id": "66905", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Ables Springs Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lupinus Solar 1, LLC", "city": "", "id": "1060", "external_id": "66895", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "166", "power_mw": "83", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fence Post Solar Hybrid Project, LLC", "city": "", "id": "1061", "external_id": "66801", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "144", "power_mw": "72", "customer": "", "owner": "Fence Post Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Midpoint Solar, LLC", "city": "", "id": "1062", "external_id": "66897", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "104", "power_mw": "52", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Indigo Solar & Storage", "city": "", "id": "1063", "external_id": "66891", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "GGS Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Albatross Solar, LLC", "city": "", "id": "1064", "external_id": "66894", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Sunraycer Assets I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upton County BESS", "city": "", "id": "1065", "external_id": "64811", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "48", "power_mw": "24", "customer": "", "owner": "VESI Upton County BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-06-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Bay City LLC", "city": "", "id": "1066", "external_id": "66930", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Bay City LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Alamo LLC", "city": "", "id": "1067", "external_id": "66929", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Alamo LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Harlingen II LLC", "city": "", "id": "1068", "external_id": "66933", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Harlingen II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Mercedes LLC", "city": "", "id": "1069", "external_id": "66926", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Mercedes LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Mission LLC", "city": "", "id": "1070", "external_id": "66927", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Mission LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Santa Rosa LLC", "city": "", "id": "1071", "external_id": "66928", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Santa Rosa LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Elsa LLC", "city": "", "id": "1072", "external_id": "66931", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Elsa LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Los Fresnos LLC", "city": "", "id": "1073", "external_id": "66932", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Los Fresnos LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Rio Grande I LLC", "city": "", "id": "1074", "external_id": "66934", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Rio Grande I LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SMT Rio Grande II LLC", "city": "", "id": "1075", "external_id": "66935", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "SMT Rio Grande II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2023-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Garn Fach Wind Farm", "city": "", "id": "1076", "external_id": "7705", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Larks Green Solar Farm", "city": "", "id": "1077", "external_id": "8052", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Enso Energy / Iron Acton Green", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Windmill Farm Solar Farm ", "city": "", "id": "1078", "external_id": "8348", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Carrs - Energy storage facility", "city": "", "id": "1079", "external_id": "9207", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Meadow Farm Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "South Pargillis - Battery Storage", "city": "", "id": "1080", "external_id": "9564", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Renewable Connections Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thurleigh Road - Battery Energy Storage", "city": "", "id": "1081", "external_id": "9651", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "69", "power_mw": "69", "customer": "", "owner": "Pathfinder Clean Energy UK Dev Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage", "city": "", "id": "1082", "external_id": "9796", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Ridge Clean Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tontine Road - Battery Energy Storage System", "city": "", "id": "1083", "external_id": "9819", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "Coriolis Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Common Farm - Solar Farm & Battery Storage", "city": "", "id": "1084", "external_id": "9877", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Banks Renewable", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Post Farm, Lytchett Minster - Battery Energy Storage", "city": "", "id": "1085", "external_id": "10291", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "32", "power_mw": "32", "customer": "", "owner": "S4N Lytchett Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Huncoat Power Station - Battery Storage", "city": "", "id": "1086", "external_id": "10516", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Benthead Farm - Solar Farm & Battery Storage", "city": "", "id": "1087", "external_id": "10542", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "31", "power_mw": "31", "customer": "", "owner": "Locogen Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Windyhill Battery Storage Facility", "city": "", "id": "1088", "external_id": "10596", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Energy GridPower Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Earraghail Renewable Energy Development", "city": "", "id": "1089", "external_id": "10712", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "ScottishPower Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Smithyard Lane - Battery Storage", "city": "", "id": "1090", "external_id": "10766", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Conrad Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ballingall Farm, Leslie - Battery Energy Storage System", "city": "", "id": "1091", "external_id": "10825", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "43", "power_mw": "43", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bolney Substation - Battery Storage", "city": "", "id": "1092", "external_id": "10843", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "264", "power_mw": "264", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Station Lane, Burton Leonard - Battery Energy Storage System", "city": "", "id": "1093", "external_id": "10893", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "33", "power_mw": "33", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Law Of Doune Road, Macduff - Battery Storage", "city": "", "id": "1094", "external_id": "10894", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Intelligent Land Investments Group Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hawthorn Grid Site - Battery Storage", "city": "", "id": "1095", "external_id": "10896", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Burton Solar Project", "city": "", "id": "1096", "external_id": "10917", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Island Green Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coalburn II Energy - Battery Storage", "city": "", "id": "1097", "external_id": "11034", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Alcemi Storage Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Well Street - Battery Storage", "city": "", "id": "1098", "external_id": "11473", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Larkfleet Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kellwood Road - Battery Storage", "city": "", "id": "1099", "external_id": "11545", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Geocore Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holmston Road - Battery Storage Facility", "city": "", "id": "1100", "external_id": "11679", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Renewable Energy Systems Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Springfield Farm, Hensall - Battery Energy Storage Facility", "city": "", "id": "1101", "external_id": "11680", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "240", "power_mw": "240", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Haughend Farm - Alyth Battery Energy Storage System", "city": "", "id": "1102", "external_id": "11858", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "450", "power_mw": "450", "customer": "", "owner": "EcoDev Group Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eccles Battery Energy Storage System", "city": "", "id": "1103", "external_id": "11867", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Weaver Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Middleton Road - Linwood Battery Energy Storage System", "city": "", "id": "1104", "external_id": "11868", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "69", "power_mw": "69", "customer": "", "owner": "Bluestone Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Burton Power Station, North Road - Battery Storage", "city": "", "id": "1105", "external_id": "11928", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "West Burton Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Normanton Energy Reserve - Battery Storage", "city": "", "id": "1106", "external_id": "11988", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Exagen SPVO2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Highfield Energy Park", "city": "", "id": "1107", "external_id": "12312", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Meetlaw Farm, Fordoun - Battery Energy Storage System", "city": "", "id": "1108", "external_id": "12361", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "One Planet Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Libra Energy Stability Project - Battery Energy Storage", "city": "", "id": "1109", "external_id": "12443", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Lightrock Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thorpe Marsh Power Station - Battery Energy Storage", "city": "", "id": "1110", "external_id": "12453", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1450", "power_mw": "1450", "customer": "", "owner": "Banks Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackdyke Farm, Blackford - Battery Storage", "city": "", "id": "1111", "external_id": "12710", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "A981 Fraserburgh - Battery Energy Storage", "city": "", "id": "1112", "external_id": "12711", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Fraserburgh Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bloch Wind Farm & Battery Storage (Solway Bank Extension)", "city": "", "id": "1113", "external_id": "12760", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Renewable Energy Systems (RES)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Camsiscan Farm, Craigie - Battery Energy Storage System", "city": "", "id": "1114", "external_id": "12820", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Noriker Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Staythorpe Road, Averham - Battery Storage", "city": "", "id": "1115", "external_id": "12893", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "SSE Battery Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coldharbour, Chickerell - Battery Storage Facility", "city": "", "id": "1116", "external_id": "12967", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "23 Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Drumore Cottage, Swordale - Battery Storage", "city": "", "id": "1117", "external_id": "12983", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Fig Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walpole Sub Station, Walpole Bank - Battery Storage", "city": "", "id": "1118", "external_id": "13045", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Henry Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Huncoat Power Station - Battery Storage Facility", "city": "", "id": "1119", "external_id": "13080", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "24 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Middleton Of Blackhills, Rothienorman - Battery Energy Storage System", "city": "", "id": "1120", "external_id": "13087", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Scot Stability Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pershore Lane, Tibberton - Battery Energy Storage System", "city": "", "id": "1121", "external_id": "13096", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "14", "power_mw": "14", "customer": "", "owner": "Sirius Renewable Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordhouse Lane - Battery Energy Storage System", "city": "", "id": "1122", "external_id": "13108", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "FPC (Electric Land) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newburgh Road, Abernethy - Energy Storage", "city": "", "id": "1123", "external_id": "13111", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "P & M Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clashindarroch Wind Farm Extension", "city": "", "id": "1124", "external_id": "13117", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Infinergy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hollins Lane - Battery Energy Storage", "city": "", "id": "1125", "external_id": "13144", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Linton Court Farm, Highnam - Battery storage", "city": "", "id": "1126", "external_id": "13145", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "STOR 136 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Merchiston Industrial Estate, Smith Street - Battery Storage", "city": "", "id": "1127", "external_id": "13225", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "43", "power_mw": "43", "customer": "", "owner": "Falkirk Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shindour, Feddal Hill Wood - Battery Energy Storage Facility", "city": "", "id": "1128", "external_id": "13236", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Quantans Hill Wind Farm", "city": "", "id": "1129", "external_id": "13238", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Vattenfall Wind Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Whelley Hill Farm, Worset Lane - Battery Energy Storage", "city": "", "id": "1130", "external_id": "13246", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Reliance Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beechwood Farm, Hodgetts Lane - Battery Storage", "city": "", "id": "1131", "external_id": "13297", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Enso Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peel Road, Westby With Plumptons - Battery Storage", "city": "", "id": "1132", "external_id": "13300", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Energi Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-02-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fairways Business Park - Battery Storage ", "city": "", "id": "1133", "external_id": "13318", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Intelligent Land Investments Group Plc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carrington Power Station, Manchester Road - Battery Storage", "city": "", "id": "1134", "external_id": "13362", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1040", "power_mw": "1040", "customer": "", "owner": "Wainstones Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lichfield Road, Watton Lane - Battery Storage", "city": "", "id": "1135", "external_id": "13369", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo ES Water Orton Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hollydale, Buildwas Road - Battery Storage", "city": "", "id": "1136", "external_id": "13410", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Telford Four Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Golf Road - Battery Energy Storage", "city": "", "id": "1137", "external_id": "13459", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Cragside Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Landulph Substation, Ellbridge Lane - Battery Energy Storage", "city": "", "id": "1138", "external_id": "13461", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Conrad Energy ", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bath Mews, Minsterley - Battery Storage Facility", "city": "", "id": "1139", "external_id": "13480", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Hydrock Consultants Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kemsley Energy Park Battery Storage", "city": "", "id": "1140", "external_id": "13489", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "120", "customer": "", "owner": "FPC Electric Land limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage", "city": "", "id": "1141", "external_id": "13550", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hickling Lane, Swainsthorpe -Battery Storage", "city": "", "id": "1142", "external_id": "13560", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "114", "power_mw": "114", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Spennymoor Greener Grid Park", "city": "", "id": "1143", "external_id": "13576", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Westerleigh Hill, Westerleigh - Battery Energy Storage Facility", "city": "", "id": "1144", "external_id": "13607", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Levedale Road, Levedale - Battery Energy Storage", "city": "", "id": "1145", "external_id": "13615", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walpole Bank - Battery Energy Storage Facility", "city": "", "id": "1146", "external_id": "13639", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Field Devco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Earthcott Green Farm, Earthcott Green - Battery Energy Storage", "city": "", "id": "1147", "external_id": "13643", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage", "city": "", "id": "1148", "external_id": "13644", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1400", "power_mw": "1400", "customer": "", "owner": "Banks Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage", "city": "", "id": "1149", "external_id": "13655", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "GAM Capital Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Astwood Lane, Feckenham - Battery Storage", "city": "", "id": "1150", "external_id": "13707", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coxmoor Wood, Crondall Road - Battery Storage", "city": "", "id": "1151", "external_id": "13728", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Fleet Green Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sale Golf Club, Golf Road - Battery Storage", "city": "", "id": "1152", "external_id": "13731", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "247 Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tofts Lane, Hunshelf - Battery Storage", "city": "", "id": "1153", "external_id": "13733", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Harmony HS (JV) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Welkin Road, Bredbury - Battery Storage System", "city": "", "id": "1154", "external_id": "13740", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Arlington Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-12-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fair Park Solar Farm", "city": "", "id": "1155", "external_id": "13761", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Downing Renewable Developments Llp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Claire Court, Rawmarsh Road - Battery Energy Storage Facility", "city": "", "id": "1156", "external_id": "13774", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Conrad Energy (Developments) Ii Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Melvich Bay - Melvich Wind Energy Hub", "city": "", "id": "1157", "external_id": "13826", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "42", "power_mw": "42", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bolney - Battery Storage", "city": "", "id": "1158", "external_id": "13880", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Bolney Green Energy Hub Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Peterstow Gas Compressor Station, Hentland - Energy Storage System", "city": "", "id": "1159", "external_id": "13976", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Marsh Lane, Gowhole - Energy Storage System", "city": "", "id": "1160", "external_id": "13982", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Novus Renewable Services Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Forest Avenue Cottage, Drumlithie - Battery Energy Storage", "city": "", "id": "1161", "external_id": "13986", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Drumlithie Battery Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pound Road, Hawkchurch - Battery Energy Storage System", "city": "", "id": "1162", "external_id": "14016", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "120", "customer": "", "owner": "Enso Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Abhainn Dubh Wind Farm", "city": "", "id": "1163", "external_id": "14039", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "E Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "J3 Business Park - Battery Storage Facility", "city": "", "id": "1164", "external_id": "14054", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "16", "power_mw": "16", "customer": "", "owner": "Forepower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Eccles II Substation - Battery Energy Storage System", "city": "", "id": "1165", "external_id": "14058", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Intergen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lower Larks Farm - Battery storage", "city": "", "id": "1166", "external_id": "14076", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "RE Projects Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-04-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Larks Lane, Iron Acton - Battery Storage Facility", "city": "", "id": "1167", "external_id": "14091", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "HD000ACT Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-16", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Quarterland Road, Islandmagee - Battery Storage", "city": "", "id": "1168", "external_id": "14117", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Solo Renewables Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Doogary Road, Omagh - Battery Storage", "city": "", "id": "1169", "external_id": "14125", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Omagh BES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ash Farm, Titchfield Lane - Battery Storage", "city": "", "id": "1170", "external_id": "14145", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "15", "power_mw": "15", "customer": "", "owner": "Botley Energy Reserve 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bishopmill - Battery Energy Storage", "city": "", "id": "1171", "external_id": "14191", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Clough Road - Battery Energy System", "city": "", "id": "1172", "external_id": "14225", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "130", "power_mw": "130", "customer": "", "owner": "GAM Capital Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Frome Power, Styles Close - Energy Storage Facility", "city": "", "id": "1173", "external_id": "14227", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Trina Solar UK Hold Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Collie Battery Stage 1", "city": "", "id": "1174", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "877", "estimate_mwh": "", "power_mw": "219", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "2023-06-19", "start_construction": "2023-06-21", "start_operation": "", "start_estimated": "2024Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31604", "long": "116.289605", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://neoen.com/en/news/2023/neoen-to-build-its-first-long-duration-battery-after-winning-a-197-mw-contract-in-western-australia/", "link2": "https://colliebattery.com.au/2023/06/21/collie-battery-stage-1-ntp/", "link3": "", "link4": ""}, {"name": "Chingjia Energy", "city": "", "id": "1175", "external_id": "", "state": "", "country": "taiwan", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "", "customer": "", "owner": "Chingjia Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "24.222065", "long": "120.945036", "coords_hint": "-2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1693770142554189983", "link2": "", "link3": "", "link4": ""}, {"name": "Gigafactory Texas", "city": "", "id": "1176", "external_id": "", "state": "texas", "country": "usa", "capacity_mwh": "250", "estimate_mwh": "", "power_mw": "125", "customer": "", "owner": "Tesla", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "68", "status": "operation", "date_first_heard": "2022-01-11", "start_construction": "2023-07-19", "start_operation": "2023-07-22", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "30.230756", "long": "-97.615973", "coords_hint": "1", "use_case": "", "notes": "used date of tweet for the operation start date", "project_website": "", "link1": "https://twitter.com/Tesla_Megapack/status/1681503667030212608", "link2": "https://twitter.com/JoeTegtmeyer/status/1654619434261135360", "link3": "https://twitter.com/SawyerMerritt/status/1682834256928571392", "link4": "https://x.com/Tesla_Megapack/status/1791530954261172681"}, {"name": "Scarlet II Hybrid", "city": "", "id": "1177", "external_id": "66951", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "EDPR Scarlet II LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Golden Field Solar III, LLC", "city": "", "id": "1178", "external_id": "63859", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "294", "power_mw": "147", "customer": "", "owner": "Golden Field Solar III, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Northern Orchard Solar PV, LLC", "city": "", "id": "1179", "external_id": "67039", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "184", "power_mw": "92", "customer": "", "owner": "Northern Orchard Solar PV, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sagebrush Solar 2 ESS 59", "city": "", "id": "1180", "external_id": "66950", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "118", "power_mw": "59", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lockhart ESS, LLC", "city": "", "id": "1181", "external_id": "66946", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "45", "customer": "", "owner": "Terra-Gen Operating Co-Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sagebrush Solar 2 ESS 40", "city": "", "id": "1182", "external_id": "66949", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "40", "customer": "", "owner": "Terra-Gen Operating Co-BESS 2", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "McLauchin", "city": "", "id": "1183", "external_id": "67041", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Archie Horne", "city": "", "id": "1184", "external_id": "67040", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Butler", "city": "", "id": "1185", "external_id": "67042", "state": "north carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "North Carolina El Member Corp", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-08", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yellow Pine II", "city": "", "id": "1186", "external_id": "67091", "state": "nevada", "country": "usa", "capacity_mwh": "", "estimate_mwh": "106", "power_mw": "53", "customer": "", "owner": "Yellow Pine Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Iron Belt", "city": "", "id": "1187", "external_id": "67059", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Iron Belt Energy Storage Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Longbow BESS, LLC", "city": "", "id": "1188", "external_id": "67083", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "348", "power_mw": "174", "customer": "", "owner": "Longbow BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Copperhead Solar, LLC", "city": "", "id": "1189", "external_id": "67019", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "National Grid Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Second Division Solar", "city": "", "id": "1190", "external_id": "65981", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Starr Solar Ranch", "city": "", "id": "1191", "external_id": "65975", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "30", "customer": "", "owner": "Lightsource Renewable Energy Asset Management, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Leake Lane, Ratcliffe - Battery Storage", "city": "", "id": "1192", "external_id": "12464", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "600", "customer": "", "owner": "Sandbrook Capital BES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blue Bell Lodge, Rye Common Lane - Battery Storage", "city": "", "id": "1193", "external_id": "12496", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pulse Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-05-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barfield Lane, Reepham - Battery Energy Storage System", "city": "", "id": "1194", "external_id": "12600", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "53", "power_mw": "53", "customer": "", "owner": "Fiskerton Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Chickerell Court Farm - Battery Energy Storage System", "city": "", "id": "1195", "external_id": "12651", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Old Vicarage, Reedley - Battery Storage", "city": "", "id": "1196", "external_id": "12767", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "European Energy A/S", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Shetland Battery Energy Storage System", "city": "", "id": "1197", "external_id": "12856", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rigifa Cove Road - Battery Storage", "city": "", "id": "1198", "external_id": "12970", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Source Galileo Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kinmuck Battery Energy Storage", "city": "", "id": "1199", "external_id": "13001", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "105", "power_mw": "105", "customer": "", "owner": "Kinmuck Energy Storage Limited / Island Green Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carrog Ganol, Rhosgoch - Battery Energy Storage System", "city": "", "id": "1200", "external_id": "13217", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Boom Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penicuik, Moorfoot Hills - Torfichen Wind Farm", "city": "", "id": "1201", "external_id": "13310", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System", "city": "", "id": "1202", "external_id": "13323", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Learielaw Farm, Learielaw - Battery Energy Storage", "city": "", "id": "1203", "external_id": "13368", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Intelligent Land Investments Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Rogerton Cottage, Markethill Road - Battery Storage Facility", "city": "", "id": "1204", "external_id": "13449", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Private Developer", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newton Farm, Westburn Road - Battery Storage Facility", "city": "", "id": "1205", "external_id": "13450", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Bluefield Renewable Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Longcroft Wind Farm", "city": "", "id": "1206", "external_id": "13539", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Energy Systems", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Butts Field, Mill Lane - Battery Storage", "city": "", "id": "1207", "external_id": "13573", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Ecotricity Generation Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage", "city": "", "id": "1208", "external_id": "13595", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Epsilon Generation", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dolphingstone Farm - Battery Energy Storage System", "city": "", "id": "1209", "external_id": "13618", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "63", "power_mw": "63", "customer": "", "owner": "RNA Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Persley Croft - Battery Storage", "city": "", "id": "1210", "external_id": "13684", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "RE Projects Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holly Lane Energy Park - Solar Farm & Battery Storage", "city": "", "id": "1211", "external_id": "13695", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Belasis Avenue - Battery Storage", "city": "", "id": "1212", "external_id": "13850", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "75", "power_mw": "75", "customer": "", "owner": "Story Construction Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bradley Road - Battery Energy Storage System", "city": "", "id": "1213", "external_id": "13863", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Renewable Connections Developments Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Loch Toftingall, Halsary Wind Farm - Battery Energy Storage", "city": "", "id": "1214", "external_id": "13949", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Infinergy Limited / Boralex", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage", "city": "", "id": "1215", "external_id": "13985", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Queequeg Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-08", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bluebell Wood Solar Farm & Battery Storage", "city": "", "id": "1216", "external_id": "13989", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Low Carbon UK Solar Investment Co Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Weston Lane - Battery Storage Facility", "city": "", "id": "1217", "external_id": "14005", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Balk, Almholme - Energy Storage System", "city": "", "id": "1218", "external_id": "14061", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "1025", "power_mw": "1025", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Illeybrook Farm - Battery Energy Storage", "city": "", "id": "1219", "external_id": "14064", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "99", "power_mw": "99", "customer": "", "owner": "Net Zero Eleven Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chillington Estate, Chillington Park - Battery Storage", "city": "", "id": "1220", "external_id": "14088", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Elgin Energy Esco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Enoch Hill, Dalmellington - Battery Storage", "city": "", "id": "1221", "external_id": "14090", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "11", "power_mw": "11", "customer": "", "owner": "RWE Renewables Uk Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wardlaw Wood Windfarm - Battery Storage", "city": "", "id": "1222", "external_id": "14231", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Community Windpower Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Houston Solar PV Farm & Energy Storage Facility", "city": "", "id": "1223", "external_id": "14294", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "The Old Rectory", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Knockodhar Wind Farm", "city": "", "id": "1224", "external_id": "14296", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "REG Knockodhar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Grendon Lakes, Grendon - Battery Storage Facility", "city": "", "id": "1225", "external_id": "14321", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-19", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Denfield Farm", "city": "", "id": "1226", "external_id": "14341", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Seahills Properties Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bywater, Kippax - Battery Energy Storage", "city": "", "id": "1227", "external_id": "14362", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Barnsdale Solar Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Caulternich Croft Energy Storage Project - Battery Storage Facility", "city": "", "id": "1228", "external_id": "14373", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Whirlwind Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kintore Substation, Leylodge - Battery Energy Storage", "city": "", "id": "1229", "external_id": "14374", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "XRE Gamma Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Seath Road, Rutherglen - Battery Storage", "city": "", "id": "1230", "external_id": "14378", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fanny House Farm, Bay Gateway - Battery Storage", "city": "", "id": "1231", "external_id": "14386", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "940", "power_mw": "940", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "West Boldon Substation - Battery Energy Storage", "city": "", "id": "1232", "external_id": "14408", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Whirlwind Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-07-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Indian Queens Sub station, Carne Hill - Battery Energy Storage", "city": "", "id": "1233", "external_id": "14461", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Renewable Connections Development Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ebstree Road, Trysull - Battery Energy Storage", "city": "", "id": "1234", "external_id": "14497", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Bengrove Bess Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "1235", "external_id": "14510", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo ES Berkswell Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Meiklelaught Farm - Battery Storage", "city": "", "id": "1236", "external_id": "14525", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Green Power Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dunside Wind Farm", "city": "", "id": "1237", "external_id": "14531", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bodinglee Wind Farm", "city": "", "id": "1238", "external_id": "14532", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "106", "power_mw": "106", "customer": "", "owner": "Banks Group", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rivox Wind Farm - Wind farm", "city": "", "id": "1239", "external_id": "14533", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "90", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "The Rake, Lower Jowkin Lane - Battery Energy Storage", "city": "", "id": "1240", "external_id": "14597", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "57", "power_mw": "57", "customer": "", "owner": "Shaw-Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Walshaw House, Regent Street - Battery Energy Storage", "city": "", "id": "1241", "external_id": "14625", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "R B Business Park Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elstree Substation, Hilfield Lane - Battery Energy Storage", "city": "", "id": "1242", "external_id": "14638", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Chiltern Renewables Hockliffe Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "New Barn Road - Battery Energy Storage Facility", "city": "", "id": "1243", "external_id": "14650", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Aton Energy Development (Northfleet) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coopers Lane, Kirkby - Battery Storage Facility", "city": "", "id": "1244", "external_id": "14670", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Pelagic Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-29", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Indian Queens National Grid Substation, Domelick Hill - Battery Storage", "city": "", "id": "1245", "external_id": "14687", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "EDF Energy Renewables (merged with Pivot Power)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility", "city": "", "id": "1246", "external_id": "14691", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tofts - Battery Storage", "city": "", "id": "1247", "external_id": "14706", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Telford Three Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Barlow Road, Barlow Road - Battery Storage", "city": "", "id": "1248", "external_id": "14715", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Vox Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wilton International, Greystones Road - Phase 1", "city": "", "id": "1249", "external_id": "14729", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "Sembcorp Utilities (UK) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Murton Way - Battery Energy Storage", "city": "", "id": "1250", "external_id": "14759", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "First Way Solar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newarthill Energy Park", "city": "", "id": "1251", "external_id": "14763", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "300", "customer": "", "owner": "Geocore Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kingston Road, Slimbridge - Battery Storage", "city": "", "id": "1252", "external_id": "14882", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "36", "power_mw": "36", "customer": "", "owner": "Relay Slimbridge Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wallerscote Limebeds - Battery Energy Storage", "city": "", "id": "1253", "external_id": "14888", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Infinis Solar Developments Limited / Green Earth Developments", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-26", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Orrell Street Battery Energy Storage Facility", "city": "", "id": "1254", "external_id": "14892", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Enzygo Limited Environmental Consultants", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-27", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fordtead Lane, Thorpe Marsh - Battery Energy Facility", "city": "", "id": "1255", "external_id": "14932", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "180", "power_mw": "180", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Junction 27, Westleigh - Battery Storage", "city": "", "id": "1256", "external_id": "14935", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Clearstone Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cargo Road, Cargo - Battery Storage", "city": "", "id": "1257", "external_id": "14939", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Immersa Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Warren Lane, Bramham - Battery Energy Storage", "city": "", "id": "1258", "external_id": "14954", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "35", "power_mw": "35", "customer": "", "owner": "Harmony Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Little Hale Fen - Solar Farm", "city": "", "id": "1259", "external_id": "14955", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "AGR Solar 2 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Old Trent Road, Beckingham - Battery Storage Facility ", "city": "", "id": "1260", "external_id": "14956", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Recell Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Fox Cover Road - Battery Energy Storage", "city": "", "id": "1261", "external_id": "14968", "state": "north east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ditcher Law Wind Farm", "city": "", "id": "1262", "external_id": "14996", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "E Power Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-09", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackdyke Farm, Blackford - Battery Storage", "city": "", "id": "1263", "external_id": "15005", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "400", "customer": "", "owner": "Innova Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-05", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Severn Road, Hallen - Battery Storage Facility", "city": "", "id": "1264", "external_id": "15027", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "70", "power_mw": "70", "customer": "", "owner": "EL Avonmouth Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Stocking Lane - Battery Energy Facility", "city": "", "id": "1265", "external_id": "15082", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Nel Tiger", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Heron Solar Farm & Battery Storage", "city": "", "id": "1266", "external_id": "15084", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "JBM Solar Projects 38 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hare Craig Windfarm", "city": "", "id": "1267", "external_id": "15101", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "EnergieKontor UK", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-07-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dolly Lane, Buxworth - Battery Storage Facility & Sub Station", "city": "", "id": "1268", "external_id": "15127", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "13", "power_mw": "13", "customer": "", "owner": "W Rigby & Sons", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Tanners Lane - Battery Energy Storage System", "city": "", "id": "1269", "external_id": "15128", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "30", "customer": "", "owner": "Tag Energy Development UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Aikengall, Innerwick - Battery Energy Storage", "city": "", "id": "1270", "external_id": "15141", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "19", "power_mw": "19", "customer": "", "owner": "Redstone Rig Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-31", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Red Barn - Solar Farm & Battery Storage", "city": "", "id": "1271", "external_id": "15146", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "40", "customer": "", "owner": "Eden Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coolkeeragh - Battery Storage", "city": "", "id": "1272", "external_id": "15151", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "140", "customer": "", "owner": "Coolkeeragh BES Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Flatterton Farm, Flatterton Road - Battery Storage", "city": "", "id": "1273", "external_id": "15154", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Big Battery (Flatterton Farm) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-02", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Monk Fryston Battery Storage", "city": "", "id": "1274", "external_id": "15164", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "320", "power_mw": "320", "customer": "", "owner": "SSE Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-08-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wareham Road, Scouse Farm - Battery Storage", "city": "", "id": "1275", "external_id": "15165", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Ylem Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cloud Hill Wind Farm", "city": "", "id": "1276", "external_id": "15174", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "34", "customer": "", "owner": "Blue Energy Company / BayWa r.e. UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Vale of Leven Wind Farm", "city": "", "id": "1277", "external_id": "15175", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Coriolis Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kilmarnock Battery Energy Storage System", "city": "", "id": "1278", "external_id": "15176", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Intergen Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hodgetts Lane, Berkswell - Electricity Storage Facility", "city": "", "id": "1279", "external_id": "15230", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Coventry Energy Storage Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-13", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rock Farm - Solar Farm", "city": "", "id": "1280", "external_id": "15248", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Anglo Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-25", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Uskmouth Power Station, West Nash Road - Battery Storage Facility", "city": "", "id": "1281", "external_id": "15263", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "350", "power_mw": "350", "customer": "", "owner": "Enso Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "New Road, Featherstone - Battery Storage", "city": "", "id": "1282", "external_id": "15297", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "Chiltern Renewables Hockliffe Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Battery Energy Storage Facility in Londonderry", "city": "", "id": "1283", "external_id": "15303", "state": "northern ireland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "34", "power_mw": "34", "customer": "", "owner": "Heron Storage Ltd", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-22", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Lowfields Energy Storage Project", "city": "", "id": "1284", "external_id": "15304", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "UK Battery Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-03-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chapel Lane - Battery Energy Storage System", "city": "", "id": "1285", "external_id": "15308", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Coylton Greener Grid Park", "city": "", "id": "1286", "external_id": "15312", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Statkraft UK Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-28", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Westfield Road, Carlton - Battery Storage", "city": "", "id": "1287", "external_id": "15338", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Firma Vogt Solar Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-01", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Midland Road - Battery Energy Storage", "city": "", "id": "1288", "external_id": "15343", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "80", "power_mw": "80", "customer": "", "owner": "Unknown", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Corner Of Weeland Road, Lunn Lane - Battery Storage Facility", "city": "", "id": "1289", "external_id": "15375", "state": "yorkshire and humber", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Newlands Hill Wind Energy Hub", "city": "", "id": "1290", "external_id": "15383", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "136", "power_mw": "136", "customer": "", "owner": "Belltown Power Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ash Tree Solar Farm & Battery Storage", "city": "", "id": "1291", "external_id": "15397", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "25", "power_mw": "25", "customer": "", "owner": "Low Carbon Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-03", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "city": "", "id": "1292", "external_id": "15401", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-11", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Surmer Hall, Church Walk - Solar Farm & Battery Storage", "city": "", "id": "1293", "external_id": "15417", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "22", "customer": "", "owner": "Boultbee Brooks (Renewables Rowley Hill) Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Auchentiber Road - Battery Energy Storage System", "city": "", "id": "1294", "external_id": "15425", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "700", "power_mw": "700", "customer": "", "owner": "Apatura GPC 700 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Burcot Solar Farm", "city": "", "id": "1295", "external_id": "15444", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Ethical Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Upper Latherford Farm, Latherford Lane - Battery Energy Storage System", "city": "", "id": "1296", "external_id": "15446", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Net Zero Twelve Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-18", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Holt Road - Battery Energy Storage", "city": "", "id": "1297", "external_id": "15470", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "47", "power_mw": "47", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Penrhos Works - Battery Energy Storage System", "city": "", "id": "1298", "external_id": "15472", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "349", "power_mw": "349", "customer": "", "owner": "Anglesey Land Holdings Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "East Claydon Battery Energy Storage", "city": "", "id": "1299", "external_id": "15501", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "500", "customer": "", "owner": "Statera Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Brockworth Road - Battery Storage System", "city": "", "id": "1300", "external_id": "15518", "state": "south west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Exagen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-04", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Derehams Farm, Derehams Lane - Battery Storage", "city": "", "id": "1301", "external_id": "15544", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "126", "power_mw": "126", "customer": "", "owner": "Newton Energi Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Electricity Substation, Bardarroch - Battery Energy Storage", "city": "", "id": "1302", "external_id": "15569", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "29", "power_mw": "29", "customer": "", "owner": "Balance Power Projects Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Toddington Services, Hipsey Spinney - Battery Storage", "city": "", "id": "1303", "external_id": "15573", "state": "eastern", "country": "uk", "capacity_mwh": "", "estimate_mwh": "250", "power_mw": "250", "customer": "", "owner": "Kona Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Caterham Bypass - Battery Energy Storage", "city": "", "id": "1304", "external_id": "15574", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "12", "power_mw": "12", "customer": "", "owner": "Ylem Energy Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Todhills and Westlinton - Harker Battery Energy Storage Facility", "city": "", "id": "1305", "external_id": "15599", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Windel Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ipswich Road Cardiff - Battery Storage", "city": "", "id": "1306", "external_id": "15610", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "93", "power_mw": "93", "customer": "", "owner": "Green Frog Power 214 Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-01-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Beehive Energy Storage", "city": "", "id": "1307", "external_id": "67184", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "500", "power_mw": "250", "customer": "", "owner": "Beehive Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mohave Energy - Hybrid", "city": "", "id": "1308", "external_id": "67178", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Mohave Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-09-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paulsell", "city": "", "id": "1309", "external_id": "67092", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Crow Creek Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Santee BESS", "city": "", "id": "1310", "external_id": "67118", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "San Diego Gas & Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Dover Energy Storage", "city": "", "id": "1311", "external_id": "67120", "state": "florida", "country": "usa", "capacity_mwh": "", "estimate_mwh": "30", "power_mw": "15", "customer": "", "owner": "Tampa Electric Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KRS I Anahola Solar Hybrid", "city": "", "id": "1312", "external_id": "58639", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Kauai Island Utility Cooperative", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "KRS II Koloa Solar", "city": "", "id": "1313", "external_id": "58640", "state": "hawaii", "country": "usa", "capacity_mwh": "", "estimate_mwh": "24", "power_mw": "12", "customer": "", "owner": "Kauai Island Utility Cooperative", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Franklin Solar Hybrid", "city": "", "id": "1314", "external_id": "67190", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Franklin Solar Idaho", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Franklin Battery Storage", "city": "", "id": "1315", "external_id": "67183", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Powell Solar", "city": "", "id": "1316", "external_id": "67157", "state": "oregon", "country": "usa", "capacity_mwh": "", "estimate_mwh": "40", "power_mw": "20", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rodeo Ranch Energy Storage", "city": "Reeves County", "id": "1317", "external_id": "67175", "state": "texas", "country": "usa", "capacity_mwh": "600", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Rodeo Ranch Energy Storage, LLC", "developer": "Plus Power", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2023-12", "start_estimated": "2024-03", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "31.444304", "long": "-103.539476", "coords_hint": "3", "use_case": "", "notes": "guessed tesla as manufacturer from twitter link and the picture on the project webiste", "project_website": "https://www.rodeoranchenergystorage.com/", "link1": "https://twitter.com/SharifaDarani/status/1612314449045762048", "link2": "", "link3": "", "link4": ""}, {"name": "Hornshadow Solar II", "city": "", "id": "1318", "external_id": "67191", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Hornshadow Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hornshadow Solar", "city": "", "id": "1319", "external_id": "67189", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Hornshadow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Paris Solar", "city": "", "id": "1320", "external_id": "65967", "state": "wisconsin", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Wisconsin Electric Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Swanbank", "city": "Ipswich", "id": "1321", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "500", "estimate_mwh": "", "power_mw": "250", "customer": "", "owner": "", "developer": "Clean Co", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-02-19", "start_operation": "", "start_estimated": "2025-06", "cost_million": "330", "cost_currency": "USD", "cost_incl_solar": "", "lat": "-27.649131", "long": "152.814807", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1759460910530265090", "link2": "https://reneweconomy.com.au/works-begin-on-giant-queensland-tesla-battery-at-site-of-former-coal-plant/", "link3": "", "link4": ""}, {"name": "Scatter Wash BESS", "city": "Phoenix", "id": "1322", "external_id": "", "state": "arizona", "country": "usa", "capacity_mwh": "1020", "estimate_mwh": "", "power_mw": "255", "customer": "", "owner": "", "developer": "Strata Clean Energy", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "500", "cost_currency": "USD", "cost_incl_solar": "", "lat": "33.685402", "long": "-112.125062", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://twitter.com/SawyerMerritt/status/1748500029197726146", "link2": "https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/", "link3": "", "link4": ""}, {"name": "Eleven Mile Solar Center", "city": "", "id": "1323", "external_id": "66263", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Eleven Mile Solar Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sun Streams 4", "city": "", "id": "1324", "external_id": "67291", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "600", "power_mw": "300", "customer": "", "owner": "Sun Streams Expansion, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sun Streams 3", "city": "", "id": "1326", "external_id": "67285", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "430", "power_mw": "215", "customer": "", "owner": "Sun Streams PVS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Serrano", "city": "", "id": "1327", "external_id": "67503", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "426", "power_mw": "213", "customer": "", "owner": "Serrano Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "McFarland C", "city": "", "id": "1328", "external_id": "67498", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-02", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scatter Wash 1", "city": "", "id": "1329", "external_id": "67454", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "340", "power_mw": "170", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Harquahala 2", "city": "", "id": "1330", "external_id": "67474", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Copia Power", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Scatter Wash 2", "city": "", "id": "1331", "external_id": "67455", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "170", "power_mw": "85", "customer": "", "owner": "Strata Manager, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pluto Energy Storage", "city": "", "id": "1332", "external_id": "67328", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Pluto Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Yuma Solar + Storage", "city": "", "id": "1333", "external_id": "67321", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "134", "power_mw": "67", "customer": "", "owner": "Invenergy Services LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Apache Solar 1", "city": "", "id": "1334", "external_id": "60964", "state": "arizona", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Arizona Electric Pwr Coop Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Trestles Grid LLC", "city": "", "id": "1335", "external_id": "67229", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Trestles Grid LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pome BESS", "city": "", "id": "1336", "external_id": "67299", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "IOWN Renewable", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "AES ES Alamitos 2 LLC", "city": "", "id": "1337", "external_id": "67579", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "164", "power_mw": "82", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Azalea (CA)", "city": "", "id": "1338", "external_id": "66890", "state": "california", "country": "usa", "capacity_mwh": "", "estimate_mwh": "120", "power_mw": "60", "customer": "", "owner": "Idemitsu Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bromley Battery Storage", "city": "", "id": "1339", "external_id": "67305", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Davis Battery Storage", "city": "", "id": "1340", "external_id": "67304", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Keenesburg Battery Storage", "city": "", "id": "1341", "external_id": "67306", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rattlesnake Ridge Battery Storage", "city": "", "id": "1342", "external_id": "67300", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "22", "power_mw": "11", "customer": "", "owner": "United Power, Inc", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "High Mesa CO", "city": "", "id": "1343", "external_id": "67323", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Mamm Creek", "city": "", "id": "1344", "external_id": "67322", "state": "colorado", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "AES Clean Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Kuna BESS", "city": "", "id": "1345", "external_id": "67549", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Kuna BESS, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Happy Valley Battery Storage", "city": "", "id": "1346", "external_id": "67573", "state": "idaho", "country": "usa", "capacity_mwh": "", "estimate_mwh": "164", "power_mw": "82", "customer": "", "owner": "Idaho Power Co", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cavalry Solar Hybrid", "city": "", "id": "1347", "external_id": "67489", "state": "indiana", "country": "usa", "capacity_mwh": "", "estimate_mwh": "90", "power_mw": "45", "customer": "", "owner": "Cavalry Energy Center LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carne Energy Storage, LLC", "city": "", "id": "1348", "external_id": "67230", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "260", "power_mw": "130", "customer": "", "owner": "Carne Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Quail Ranch Solar and BESS", "city": "", "id": "1349", "external_id": "67204", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "Quail Ranch Solar and Battery Energy Storage System", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-11", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Milagro Solar I", "city": "", "id": "1350", "external_id": "67528", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "75", "customer": "", "owner": "Milagro Solar I, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-10", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wildcat Solar Power Plant LLC", "city": "", "id": "1351", "external_id": "64849", "state": "new mexico", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Solariant Capital, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Big Fork Solar", "city": "", "id": "1352", "external_id": "62184", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "148", "power_mw": "74", "customer": "", "owner": "Big Fork Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Colleton Solar", "city": "", "id": "1353", "external_id": "62188", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "148", "power_mw": "74", "customer": "", "owner": "Colleton Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Crossroads Solar", "city": "", "id": "1354", "external_id": "62190", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Crossroads Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Quest Solar", "city": "", "id": "1355", "external_id": "62299", "state": "south carolina", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Quest Solar", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Anemoi Energy Storage", "city": "", "id": "1356", "external_id": "67236", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Anemoi Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ebony Energy Storage", "city": "", "id": "1357", "external_id": "67237", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Ebony Energy Storage, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2024-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Alina Energy LLC", "city": "", "id": "1358", "external_id": "67250", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Alina Energy LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Rock Rose Energy Storage LLC", "city": "", "id": "1359", "external_id": "67249", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Rock Rose Energy Storage LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Bell Creek BESS LLC", "city": "", "id": "1360", "external_id": "67535", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "Nexus Renewables U.S. Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Blackcat BESS", "city": "", "id": "1361", "external_id": "67558", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "400", "power_mw": "200", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wetzel BESS", "city": "", "id": "1362", "external_id": "67555", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-09", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Serrano BESS", "city": "", "id": "1363", "external_id": "67556", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "370", "power_mw": "185", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2028-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Desert Willow Energy Storage", "city": "", "id": "1364", "external_id": "67598", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "300", "power_mw": "150", "customer": "", "owner": "Desert Willow Energy Storage", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "SGT Hoskins Solar Project Hybrid", "city": "", "id": "1365", "external_id": "67341", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "204", "power_mw": "102", "customer": "", "owner": "SGT Hoskins Solar Project, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Jim Wells BESS", "city": "", "id": "1366", "external_id": "67553", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "100", "customer": "", "owner": "RIC Development, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2027-04", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cairos Solar and Storage", "city": "", "id": "1367", "external_id": "67581", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "154", "power_mw": "77", "customer": "", "owner": "Samsung C&T Renewables, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ganado Solar", "city": "", "id": "1368", "external_id": "67284", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "140", "power_mw": "70", "customer": "", "owner": "Enel Green Power NA, Inc.", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-03-01", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Elm Flats Solar", "city": "", "id": "1369", "external_id": "67552", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Birch Creek Development", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Cedar Hill ESS", "city": "", "id": "1370", "external_id": "67570", "state": "texas", "country": "usa", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "10", "customer": "", "owner": "Cedar Hill ESS Assets, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Green River Energy Center - Hybrid", "city": "", "id": "1371", "external_id": "67501", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "800", "power_mw": "400", "customer": "", "owner": "Green River Energy Center, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026-05", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hornshadow Solar II, LLC", "city": "", "id": "1372", "external_id": "67511", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "50", "customer": "", "owner": "Hornshadow Solar II, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hornshadow Solar, LLC", "city": "", "id": "1373", "external_id": "67497", "state": "utah", "country": "usa", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "25", "customer": "", "owner": "Hornshadow Solar, LLC", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2025-06", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Sendai", "city": "sendai", "id": "1374", "external_id": "", "state": "miyagi", "country": "japan", "capacity_mwh": "43", "estimate_mwh": "", "power_mw": "11", "customer": "", "owner": "Kenes", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "14", "status": "operation", "date_first_heard": "", "start_construction": "", "start_operation": "2024-06-17", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "38.271948", "long": "140.833529", "coords_hint": "3", "use_case": "", "notes": "guessed the mw, assuming it is a 4h system", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1802738958679285856", "link2": "", "link3": "", "link4": ""}, {"name": "Rye Common Lane", "city": "", "id": "1375", "external_id": "7028", "state": "south east", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Harmony Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-14", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Pancross & Oaklands Solar Farm", "city": "", "id": "1376", "external_id": "7702", "state": "wales", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Sirius Renewable Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-09-20", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Carlisle Road - Battery Energy Storage System", "city": "", "id": "1377", "external_id": "9684", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "200", "power_mw": "200", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2021-09-23", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Chapel Lane - Battery Energy Storage System", "city": "", "id": "1378", "external_id": "9721", "state": "west midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Anesco Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hornsea Project Three - Battery Storage", "city": "", "id": "1379", "external_id": "9754", "state": "eastern", "country": "uk", "capacity_mwh": "600", "estimate_mwh": "", "power_mw": "200", "customer": "", "owner": "Orsted Power (UK) Limited", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-01-23", "start_construction": "", "start_operation": "", "start_estimated": "2026Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/Tesla_Megapack/status/1800920444276543858", "link2": "https://orsted.com/en/media/news/2024/06/orsted-invests-in-battery-energy-storage-system-co-1390267511", "link3": "", "link4": ""}, {"name": "Glenniston Farm, Auchtertool - Solar Farm", "city": "", "id": "1380", "external_id": "10434", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Locogen Consulting Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-01-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Culachy Wind Farm", "city": "", "id": "1381", "external_id": "10714", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "10", "power_mw": "10", "customer": "", "owner": "Fred Olsen Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-06", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Printworks Road - Stalybridge Battery Storage", "city": "", "id": "1382", "external_id": "10808", "state": "north west", "country": "uk", "capacity_mwh": "", "estimate_mwh": "150", "power_mw": "150", "customer": "", "owner": "Zenobe Energy", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-15", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Watten Wind Farm", "city": "", "id": "1383", "external_id": "11480", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "EDF Energy Renewables", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2022-06-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Ben Aketil Wind Farm - Repowered & Extended", "city": "", "id": "1384", "external_id": "11876", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "20", "power_mw": "20", "customer": "", "owner": "Falck Renewables Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-10", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Main Street, Kelham - Solar Farm & Battery Energy Storage", "city": "", "id": "1385", "external_id": "11999", "state": "east midlands", "country": "uk", "capacity_mwh": "", "estimate_mwh": "50", "power_mw": "50", "customer": "", "owner": "Assured Asset Solar 2 Limited (Peridot Solar)", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-10-30", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Saturland Farm, Salterland Road - Battery Energy Storage System", "city": "", "id": "1386", "external_id": "12024", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "60", "power_mw": "60", "customer": "", "owner": "Resources Unlimited LLP", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-07", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Hill of Fare - Hill of Fare Wind Farm & Battery Storage", "city": "", "id": "1387", "external_id": "12026", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "100", "power_mw": "100", "customer": "", "owner": "RES Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-11-24", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Loch Fergus Farm - Energy Storage System", "city": "", "id": "1388", "external_id": "12274", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "45", "power_mw": "45", "customer": "", "owner": "Locogen", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-09-12", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage", "city": "", "id": "1389", "external_id": "12350", "state": "scotland", "country": "uk", "capacity_mwh": "", "estimate_mwh": "49", "power_mw": "49", "customer": "", "owner": "Relay Balbeggie Limited", "developer": "", "manufacturer": "", "type": "", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-08-17", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "", "long": "", "coords_hint": "", "use_case": "", "notes": "", "project_website": "", "link1": "", "link2": "", "link3": "", "link4": ""}, {"name": "Supernode Stage 1", "city": "brisbane", "id": "1390", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "520", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "construction", "date_first_heard": "", "start_construction": "2024-04-11", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.318405", "long": "152.969631", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/", "link2": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link3": "https://x.com/FredericLambert/status/1811399467070894094", "link4": ""}, {"name": "Supernode Stage 2", "city": "brisbane", "id": "1391", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "1040", "estimate_mwh": "", "power_mw": "250", "customer": "Origin Energy", "owner": "Quinbrook", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.320103", "long": "152.970537", "coords_hint": "2", "use_case": "", "notes": "todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer", "project_website": "https://supernode.com.au/project/metro-dc/", "link1": "https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/", "link2": "https://x.com/FredericLambert/status/1811399467070894094", "link3": "", "link4": ""}, {"name": "Brendale BESS", "city": "brisbane", "id": "1392", "external_id": "", "state": "queensland", "country": "australia", "capacity_mwh": "410", "estimate_mwh": "", "power_mw": "205", "customer": "", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-12-21", "start_construction": "", "start_operation": "", "start_estimated": "2025-07", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-27.329132", "long": "152.973193", "coords_hint": "1", "use_case": "", "notes": "got the location from the picture and in the energy storage article it says it is hosted on unitywater site", "project_website": "https://akayshaenergy.com/projects/brendale-bess", "link1": "https://www.energy-storage.news/australia-blackrock-backed-developer-akaysha-energy-progresses-710mwh-of-queensland-bess-projects/", "link2": "", "link3": "", "link4": ""}, {"name": "Ville-sur-Haine", "city": "", "id": "1393", "external_id": "", "state": "", "country": "belgium", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "Eneco", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2023-06-13", "start_construction": "", "start_operation": "", "start_estimated": "2024-12", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "50.47647", "long": "4.077998", "coords_hint": "3", "use_case": "", "notes": "", "project_website": "", "link1": "https://www.pv-magazine.com/2023/06/13/eneco-to-build-50-mw-200-mwh-project-in-belgium/", "link2": "", "link3": "", "link4": ""}, {"name": "Collie Battery Stage 2", "city": "", "id": "1394", "external_id": "", "state": "western australia", "country": "australia", "capacity_mwh": "1363", "estimate_mwh": "", "power_mw": "341", "customer": "", "owner": "neoen", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "224", "status": "construction", "date_first_heard": "", "start_construction": "2024-05-01", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-33.31", "long": "116.29", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "https://colliebattery.com.au", "link1": "https://colliebattery.com.au/2024/05/01/construction-stage2/", "link2": "", "link3": "", "link4": ""}, {"name": "Orana BESS", "city": "wellington", "id": "1395", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "1660", "estimate_mwh": "", "power_mw": "415", "customer": "EnergyAustralia", "owner": "Akaysha Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-07-15", "start_construction": "", "start_operation": "", "start_estimated": "2026", "cost_million": "650", "cost_currency": "AUD", "cost_incl_solar": "0", "lat": "-32.527608", "long": "148.958942", "coords_hint": "2", "use_case": "", "notes": "", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1812687836887281794", "link2": "https://akayshaenergy.com/news/akaysha-energy-secures-largest-bess-financing-globally-at-650-million", "link3": "", "link4": ""}, {"name": "Limondale", "city": "balranald", "id": "1396", "external_id": "", "state": "new south wales", "country": "australia", "capacity_mwh": "400", "estimate_mwh": "", "power_mw": "50", "customer": "", "owner": "RWE", "developer": "", "manufacturer": "tesla", "type": "megapack", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "2024-05-28", "start_construction": "", "start_operation": "", "start_estimated": "2025Q4", "cost_million": "", "cost_currency": "", "cost_incl_solar": "", "lat": "-34.774873", "long": "143.526866", "coords_hint": "2", "use_case": "", "notes": "location from the balrnald supstation on google maps", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1795348622864945179", "link2": "https://reneweconomy.com.au/germany-energy-giant-presses-go-on-australias-first-eight-hour-big-battery/", "link3": "", "link4": ""}, {"name": "Glenbrook", "city": "glenbrook", "id": "1397", "external_id": "", "state": "", "country": "new zealand", "capacity_mwh": "200", "estimate_mwh": "", "power_mw": "100", "customer": "", "owner": "Contact Energy", "developer": "", "manufacturer": "tesla", "type": "megapack 2XL", "cells": "", "no_of_battery_units": "", "status": "planning", "date_first_heard": "", "start_construction": "", "start_operation": "", "start_estimated": "2026Q1", "cost_million": "163", "cost_currency": "NZD", "cost_incl_solar": "0", "lat": "-37.203762", "long": "174.734204", "coords_hint": "2", "use_case": "", "notes": "location from the steal site and substation", "project_website": "", "link1": "https://x.com/SawyerMerritt/status/1807635731197702615", "link2": "https://www.nzherald.co.nz/business/glenbrook-to-get-big-grid-scale-battery-as-contact-teams-up-with-tesla/5KULSHHUVFEWFBSXYU3G42ONEE/", "link3": "https://www.pv-magazine-australia.com/2024/07/10/contact-teams-with-tesla-on-200-mwh-battery-for-nz/", "link4": ""}] \ No newline at end of file diff --git a/docs/projects/1397.html b/docs/projects/1397.html new file mode 100644 index 00000000..88378981 --- /dev/null +++ b/docs/projects/1397.html @@ -0,0 +1,238 @@ + + + + + + + + + + + + + + + + + + + + + +1397 Glenbrook (200MWh) + + + + + + + + + + + + + +
+ + + +
+ + +

Glenbrook πŸ‘€

+ +
Status
+
planning
+ +
Country / State / Closest City
+
πŸ‡³πŸ‡Ώ new zealand / / glenbrook
+ +
Dates
+
+
+ + + + + + + + + + + + + + + + + + + + + + +
First heard
Construction start
Operation start
Estimated start2026Q1
Construction time + +
+
+
+ +
Capacity in MWh
+
+ 200 + + +
+ + +
Maximum Power in MW
+
100
+ +
Manufacturer
+
tesla
+ +
Type / Number of Packs / Cells
+
megapack 2XL / /
+ +
Customer / Owner / Developer
+
/ Contact Energy /
+ + +
Use case
+
+ +
Link to google maps satellite view
+
http://maps.google.com/maps?z=19&t=k&q=loc:-37.203762+174.734204
+ +
Coordinates
+
+ -37.203762, 174.734204 +
βœ… The site is known, coords are +/- 1 kilometer +
+ +
+
+
+
+
+ +
Notes
+
+ + location from the steal site and substation
+ +
+ +
Project website
+
+ +
Sources
+
+ + https://x.com/SawyerMerritt/status/1807635731197702615
+ + https://www.nzherald.co.nz/business/glenbrook-to-get-big-grid-scale-battery-as-contact-teams-up-with-tesla/5KULSHHUVFEWFBSXYU3G42ONEE/
+ + https://www.pv-magazine-australia.com/2024/07/10/contact-teams-with-tesla-on-200-mwh-battery-for-nz/
+ +
+ +
Internal / External id
+
+ 1397 / +
+ + + + + + + +
+ + + + + + + + + + + + + + + + + + \ No newline at end of file